ETNIP Procurement Plan Works Proc Prio Method Estimat Actual Descriptio r/ and type Bid ID ed Cost Contract n Pos of mln Price US$ t contract USD Rehabilitati ICB/Desig on of n, Supply Prio ETNIP_HVEN_ICB_1/201 9,181,847. Ashnak and r 5 20.525 Installatio 36 substation1 n Rehabilitati ICB/Desig on of n, Supply Prio ETNIP_YTPP_ICB_1/201 20,432,914 substation and r 5 35.875 Installatio .63 of YTPC2 n Consulting Services Selectio Prior/Po Description BID ID n st Method Project implementation support ETNIP_HVEN_CS_1/201 QCBS Prior to HVEN1 5 Consultant for preparation and implementation of design, supply ETNIP_HVEN_CS_1/201 IC Post and installation contract for 5 back-up dispatch center2 Project implementation support ETNIP_YTPP_CS_1/2015 QCBS Prior to YTPC Project Audit3 • For THE AUDIT OF ELECTRICITY TRANSMISSION NETWORK ETNIP_HVEN_CS_1/20 LC Post IMPROVEMENT PROJECT (IBRD 17 84950) FOR THE PERIOD FROM SEPTEMBER 21, 2015 TO DECEMBER 31, 2016 • THE ELECTRICITY TRANSMISSION NETWORK IMPROVEMENT PROJECT (IBRD 84950) FOR THE YEAR ENDING DECEMBER 31, 2017 • THE ELECTRICITY TRANSMISSION NETWORK IMPROVEMENT PROJECT (IBRD 84950) FOR THE YEAR ENDING DECEMBER 31, 2018 Individual consultant to prepare economic and financial analyses ETNIP_HVEN_SSS-1 SSS Prior for rehabilitation of Ararat-2 substation Individual consultant to prepare ETNIP_HVEN_SSS-2 SSS Post EMP for rehabilitation of Ararat-2 YTPC substation rehabilitation support group PROCUREMENT Armenia : Electricity Transmission Network Improvement Project PLAN General Information Country: Armenia Bank’s Approval Date of the Original Procurement Plan: 2019-11-11 2021-01-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P146199 GPN Date: Project Name: Electricity Transmission Network Improvement Project Loan / Credit No: IBRD / 84950 High Voltage Electric Networks JSC Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ETNIP_HVEN_ICB_1/2015 / Component 1: Strengthening Single Stage - One 9,824,571.3 2021-01- Contract has been signed on IBRD / 84950 of the power transmission Prior Request for Bids Open - International Signed 2020-03-19 2020-03-19 2020-03-20 2020-03-21 2020-03-23 2020-03-22 2016-07-01 Envelope 6 03 July 01, 2015. network HVEN-DSI-1/2020_1 / Design, Supply and Component 1: Strengthening Under Single Stage - One 2023-11- Installation for Rehabilitation IBRD / 84950 of the power transmission Prior Request for Bids Open - International 0.00 Implementat 2020-05-08 2020-12-01 2020-08-02 2020-12-28 2020-10-01 2021-01-29 2021-03-05 Envelope 05 of 220 kV "Ararat-2" network ion substation GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ETNIP-CS-1/2015 / Project Implementation Support and Component 1: Strengthening Quality And Cost- Supervision Consultant for IBRD / 84950 of the power transmission Prior Open - International 463,524.46 Signed 2016-09-22 2016-12-08 Based Selection rehabilitation of Ashnak network substation HV-CS-1/2020_ETNIP / THE AUDIT OF THE ELECTRICITY Component 1: Strengthening TRANSMISSION NETWORK Least Cost IBRD / 84950 of the power transmission Post Open - International 5,184.29 Signed 2020-02-21 2020-02-28 2020-03-06 2020-03-03 2020-03-17 2020-04-01 2020-03-31 2020-04-15 2020-04-07 2020-05-06 2020-04-12 2020-05-11 2020-04-22 2020-05-11 2020-06-19 IMPROVEMENT PROJECT (IBRD Selection network 84950) FOR THE YEAR ENDED DECEMBER 31, 2019 HV-CS-1/2021_ETNIP / THE AUDIT OF THE ELECTRICITY Component 1: Strengthening TRANSMISSION NETWORK Fixed Budget Pending IBRD / 84950 of the power transmission Post Open - International 0.00 2021-01-22 2021-02-05 2021-02-17 2021-03-03 2021-03-12 2021-03-18 2021-03-22 2021-05-20 IMPROVEMENT PROJECT (IBRD Selection Implementation network 84950) FOR THE YEAR ENDED DECEMBER 31, 2020 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HV-IC-SSS-ESRAF-1/2016 / Component 1: Strengthening Economic Evaluation of IBRD / 84950 of the power transmission Prior Direct Selection Direct 11,334.20 Signed 2017-04-21 Rehabilitation of Ararat-2 network Substation Page 1