E4086v11 PUBLIC WORKS DEPARTMENT GOVERNMENT OF KERALA KERALA STATE TRANSPORT PROJECT - II EIA and EMP for Chengannur – Ettumanoor - Moovattupuzha Road Part II - Volume II Environmental Management Plan (EMP) for Ettumanoor - Moovattupuzha Road April 2013 Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road TABLE OF CONTENTS CHAPTER 1. INTRODUCTION.......................................................................................... 1.1 1.1. ENVIRONMENTAL ASSESSMENT (EA) PROCESS.................................................................................................... 1.1 1.2. OBJECTIVES OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) ........................................................................ 1.2 1.3. UNIQUE CHARACTERISTICS OF PROJECT LOCATION - KERALA ........................................................................... 1.2 1.4. ENVIRONMENTAL REGULATIONS APPLICABLE TO THE PROJECT ........................................................................ 1.3 1.5. METHODOLOGY OF PREPARING EMP ................................................................................................................... 1.4 1.6. DEFINITION OF TERMS USED IN THE PROJECT ...................................................................................................... 1.6 CHAPTER 2. PROJECT DESCRIPTION.............................................................................. 2.1 2.1. REGIONAL SETTING OF THE PROJECT ROAD ......................................................................................................... 2.1 2.2. LINK DESCRIPTION .................................................................................................................................................. 2.1 2.3. PROPOSED PROJECT IMPROVEMENTS .................................................................................................................... 2.9 2.4. ENVIRONMENTAL ENHANCEMENT MEASURES ADOPTED IN THE PROJECT ..................................................... 2.10 CHAPTER 3. ENVIRONMENTAL MANAGEMENT ACTION PLAN .................................. 3.1 3.1. INTRODUCTION........................................................................................................................................................ 3.1 3.2. PENALTY CLAUSE FOR NONCONFORMITY TO EMP.............................................................................................. 3.2 CHAPTER 4. ARRANGEMENTS FOR THE IMPLEMENTATION OF EMAP....................... 4.1 4.1. ORGANISATION, STAFFING AND RESPONSIBILITIES OF PMT ............................................................................. 4.1 4.2. ORGANISATION, STAFFING AND RESPONSIBILITIES OF CONSULTANT SUPERVISION CONSULTANT (CSC) .. 4.4 4.3. ORGANISATION, STAFFING AND RESPONSIBILITIES OF CONSTRUCTION CONTRACTOR.................................. 4.6 4.4. INFORMATION DISSEMINATION ............................................................................................................................ 4.8 4.5. GRIEVANCE REDRESSAL MECHANISM .................................................................................................................. 4.8 4.6. TRAINING PROGRAMME ON ENVIRONMENTAL ASPECTS .................................................................................... 4.9 CHAPTER 5. ENVIRONMENTAL MONITORING & REPORTING REQUIREMENTS ........ 5.1 5.1. MONITORING AND REPORTING OF ENVIRONMENTAL MANAGEMENT MEASURES .......................................... 5.1 5.2. ENVIRONMENTAL MONITORING PLAN FOR THE PROJECT................................................................................... 5.7 CHAPTER 6. ENVIRONMENTAL BUDGET ....................................................................... 6.1 6.1. ENVIRONMENTAL BUDGET TO BE INCURRED BY KSTP ....................................................................................... 6.1 6.2. CONTRACTOR ITEMS REQUIRING ENVIRONMENTAL MANAGEMENT ................................................................ 6.2 Wilbur Smith Associates Pvt. Ltd. i Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road LIST OF TABLES Table 1.1. List of Environmental Regulations Applicable to the Project .................................................. 1.3 Table 1.2. Guidelines in Generic EMAP........................................................................................................ 1.5 Table 2.1. Environmental Data Sheet............................................................................................................. 2.4 Table 2.2. Proposed Realignment Locations for the Project....................................................................... 2.9 Table 3.1. Part-I Generic Environmental Management Action Plan for PMT, CSC and Others.......... 3.3 Table 3.2. Part-II Generic Environmental Management Action Plan for Contractor– Preconstruction Phase, Construction Phase and Operational Phase.................................................................... 3.9 Table 3.3. Part-I Link Specific Environmental Management Action Plan for PMT, CSC and Others3.27 Table 3.4. Part-II Link Specific Environmental Management Action Plan for Contractor ................. 3.28 Table 4.1. Staffing Pattern in Contractor’s Office ....................................................................................... 4.6 Table 4.2. Training Programme to the Contractor’s Staff.......................................................................... 4.9 Table 5.1. Monitoring and Reporting Plan for Entire Project.................................................................... 5.4 Table 5.2. Environmental Monitoring Plan................................................................................................... 5.7 Table 6.1. Environmental Budget to be Incurred by KSTP........................................................................ 6.1 Table 6.2. Contract Items Included in Contractor Cost for Environmental Management (Contract BOQ Bill No 11) for Link 5 ........................................................................................................... 6.2 Table 6.3. Contract Items Requiring Environmental Management Included in Contractor Cost for Site Clearance (Contract BOQ Bill No 2) for Link 5......................................................................... 6.3 Table 6.4. Contract Items Requiring Environmental Management Included in Contractor Cost for Earth Work (Contract BOQ Bill No 3) for Link 5 ..................................................................... 6.3 LIST OF FIGURES Figure 2.1. Regional Setting of the Project Area ............................................................................................ 2.2 Figure 2.2. Location Map of Ettumanoor – Moovattupuzha Road.............................................................. 2.3 Figure 4.1. Institutional Organisation for KSTP EMP Implementation ..................................................... 4.2 Figure 4.2. Environmental Management Unit (EMU) ................................................................................... 4.2 Figure 4.3. Organisation Structure, KSTP...................................................................................................... 4.3 Wilbur Smith Associates Pvt. Ltd. ii Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Chapter 1. Introduction Government of Kerala (GOK), is implementing KSTP in two stages, KSTP–I was completed by 2011 and KSTP–II has been taken up now. The project is to upgrade critical sections of the State’s road network. The Project is supported by the International Bank for Reconstruction and Development (IBRD/World Bank). The KSTP-II project road Ettumanoor – Moovattupuzha (Link 5) is one of the several road links considered as a part of the 600 km of high priority roads selected after the feasibility study of 87 potential road links. The KSTP-II road improvement component of the project (~330 km) requires World Bank and GOK clearances and approvals before construction can proceed. An Environmental Management Plan (EMP) has been prepared for the section Ettumanoor – Moovattupuzha (Link 5) of length 41.000 km, (Pl refer Figure 2.1) considered in KSTP-II of the 600 km high priority roads to define the Environmental Management requirements to ensure environmental safe guards during construction and operation. Earlier as a first step a Sectoral Environmental Assessment (SEA) was prepared in December 2001 in accordance to the World Bank requirements for the high priority roads. For KSTP-I roads, all clearances have been obtained prior to the approval of the loan application. All KSTP-II Roads including this link roads required clearance/ approval from World Bank, Government of India, and GOK. The most important parts of this document are the Generic Environmental Management Action Plan (EMAP) and Link Specific Environmental Management Action Plan (EMAP). The Generic EMAP comprises activity wise impacts and generic mitigation measures identified for each environmental attribute like land, water, air, noise, biological environment, social environment and solid waste management. A robust Monitoring and Reporting (M&R) system is in-built into it for various phases of the project and activities. This is supported by annexures, which provides (i) detailed guidelines to enable the Contractor to implement the EMAP in an appropriate manner, (ii) monitoring formats for the Contractor to report to CSC (Consultant Supervision Consultant) and (iii) checklists for the CSC to monitor the implementation of EMAP. This has been evolved based on the lessons learned from the review of implementation of EMAP in KSTP-I conducted by Wilbur Smith Associates in June 2012. The acquisition of land, which has already been identified under earlier design, is almost complete. RAP provides compensation and rehabilitation, for direct (private properties) social impacts, while EMP provides other social impact mitigation and enhancement for direct (public properties) and indirect impacts. The Link Specific EMAP and its annexures provide link specific and location specific impacts, mitigation measures and enhancement details. 1.1.Environmental Assessment (EA) Process The EA has been carried out for the entire project and an overview is furnished in the SEA mentioned above. The project /link specific issues are addressed in the Environmental Impact Assessment reports and EMPs. This document addresses the corridor-specific Environmental Management Plan (EMP) for the 41.000 km of Ettumanoor - Moovattupuzha road (Link 5) included in the KSTP-II improvement programme. EIA and EMP reports identifies the environmental impacts in the earlier stages of project preparation to incorporate necessary mitigation measures required to minimise those impacts as well as to enhance the positive factors. All environmental management/ mitigation costs have been included in the Bill of Quantities (BOQ) Bill No 2 titled ‘Site Clearance’, Bill No 3 titled ‘Earth Work’ and Bill No.11 Wilbur Smith Associates Pvt. Ltd. 1.1 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Titled ‘Environmental impact mitigation works’. In addition to this an environmental monitoring and training budget is included separately as EMU /PMT1 costs as project costs. The project’s Social Impact Assessments resulted in the preparation of a Resettlement Action Plan (RAP) for KSTP-II roads to address the land acquisition procedures and all associated social aspects such as compensation, resettlement and relocation. This RAP is currently being implemented by PMT and is soon nearing completion. Similarly the environmental studies has led to the preparation of link specific EMPs. This document assists the Contractor and associated officials to mitigate or minimize the negative social and environmental impacts due to the construction and operation of the project and to enhance the positive impact of this project. The EMP has been prepared to meet the GOI requirements as specified by the Ministry of Environment and Forest (MoEF) and meeting the requirements of the World Bank. Its purpose is to present an evaluation of potential impacts due to the proposed upgrading and realignment of the existing State Highway from Ettumanoor - Moovattupuzha. The document has presented the impacts, mitigation measures and appropriate costs for the proposed mitigation measures. The environmental and social impact mitigation and enhancement details of the proposed action within the Link 5 corridor are presented and evaluated in detail in the remaining part of the document. Institutional strengthening for environmental management is also an essential part of this document for implementing contract provisions and other environmental mitigation and enhancement provisions. 1.2. Objectives of Environmental Management Plan (EMP) The objectives of the Environmental Management Plan (EMP) are to  Define the Environmental management principles and guidelines for the pre- construction, construction and post construction phases of the road improvement.  Describe the practical mitigation measures that should be implemented on road improvement works and ancillary sites (Quarry and borrow areas) to prevent or mitigate any negative environmental impacts and to enhance the positive issues.  Establish the roles and responsibilities of all stakeholders involved in the implementation of environmental controls;  Establish monitoring and reporting system for facilitating aprropriate implementation of EMP. 1.3. Unique Characteristics of Project Location - Kerala The Contractor may not be from India and will be required to be familiar with the unique characteristics of Kerala State. Kerala is a vegetation-covered strip of land of 600 km long with an average width of 75 km and a steep slope from the Western Ghats in the East to the Arabian Sea Coast in the West. This steep slope from the Western Ghats at an average height of 800 m above mean sea level to the sea drains the area very quickly during monsoon. During non-monsoon season, scarcity of drinking water is a common problem in many parts of the State. The unique nature of Kerala can be explained by 1 The PIU (Project Implementation Unit) of the PWD was re-christened as the PMT (Project Management Team) in April 2002 Wilbur Smith Associates Pvt. Ltd. 1.2 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road  High Population Density  Unique settlement pattern known as ‘Urban-Rural Continuum’.  Steep topography, dense river regimes, and derived hills  High precipitation  Rivers, backwaters, lakes and ponds  Low lying paddy fields  High-density road network As in many densely populated areas of the world, the old road system has evolved over the years with very few highways designed for road safety to meet the peculiar mix of pedestrians and vehicles, which they carry. 1.4. Environmental Regulations Applicable to the Project Summary of environmental clearances/ permits/ approvals required for the project is presented in Table 1.1. During the pre-construction stage, the responsibility of obtaining clearances from concerned authority lies with PWD. Those clearances which needs to be obtained during construction phase, but prior to work initiation lies with the Contractor. Table 1.1. List of Environmental Regulations Applicable to the Project Sl. No Type of Clearance Statutory Applicability Project Stage Responsibility Authority 1. Tree felling Kerala State Felling of Pre KSTP permission Forests avenue trees construction Department 2. Consent to Establish Kerala State For the entire Pre KSTP under the Air Pollution project road construction (Prevention & Control Board Control of Pollution) Act, 1981 and The Water (Prevention & Control of Pollution) Act, 1974. 3. Consent to Establish Kerala State For operating Construction Contractor under the Air Pollution hot mix plants, (Prior to work (Prevention & Control Board crushers and initiation) Control of Pollution) construction Act, 1981 and The camps Water (Prevention & Control of Pollution) Act, 1974. 4. Consent to Operate Kerala State For operating Construction Contractor under the Air Pollution hot mix plants, (Prior to work (Prevention & Control Board crushers and initiation) Control of Pollution) construction Act, 1981 and The camps Water (Prevention & Control of Pollution) Act, 1974. 5. Permission to store Kerala State Storage and Construction Contractor Hazardous Materials Pollution Transportation (Prior to work under Hazardous Control Board of Hazardous initiation) Wilbur Smith Associates Pvt. Ltd. 1.3 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No Type of Clearance Statutory Applicability Project Stage Responsibility Authority Waste (Management Materials and and Handling) Act Explosives 1989 6. Explosive license Chief Storage of Construction Contractor under The Controller of explosive (Prior to work Explosives Act (& Explosives, materials initiation) Rules), 1884 (revised petroleum & in 1983) Explosive Safety Organization 7. PUC for vehicles for Motor Vehicle For all Construction Contractor construction under Department of construction (Prior to work Central Motor and Kerala vehicles initiation) Vehicle Act 1988 8. Quarry lease deeds Mining and Quarrying and Construction Contractor and license under Geology borrowing (Prior to work The Mines Act, 1958 Department of operations initiation) Kerala 9. Extraction of sand District level Extraction of Construction Contractor from rivers Expert Sand from (Prior to work committee rivers initiation) under district collector and local govt. body 10. Consent for ground Kerala Ground Ground water Construction Contractor water extraction Water extraction for (Prior to work Authority construction initiation) camps 1.5. Methodology of Preparing EMP Much of the environmental degradation that happens during the construction stage of a highway can be prevented or controlled, if there is an appropriate system in place. Hence, this EMAP table has been specifically designed to capture all the impacts that take place during the entire life cycle of a project from design to operation stage. Accordingly, a thorough activity analysis was carried out listing out all the project activities, based on which an impact identification matrix was prepared to understand the impacts upon various environmental parameters such as land, water, air, noise, flora and fauna. Lastly, socio-economic impact upon people and solid waste generation was also considered as separate impacts. Based on this exercise, a totally new Environmental Management Plan (EMP) has been prepared suggesting various mitigation measures to avoid or minimize the impacts of the project on the environment during the pre-construction, construction and operation phases. Two sets of guidelines were prepared and incorporated in the Generic EMAP table of EMP reports to enable the Contractor to implement the project with least impact upon the environment– (i) Guidelines for entire project stretch including the project facilities like camps and sites and (ii) Guidelines exclusively for siting, management and restoration of project facilities like camps and sites. Table 1.2 gives the list of these guidelines: Wilbur Smith Associates Pvt. Ltd. 1.4 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Table 1.2. Guidelines in Generic EMAP Sl. No. Title A Guidelines for entire project stretch 1. Guidelines for preparing comprehensive waste management plan 2. Guidelines for top soil conservation and reuse 3. Guidelines for Provision of Noise Barriers 4. Guidelines to Ensure Worker’s Safety during Construction 5. Guidelines for Preparation of Traffic Management Plan 6. Guidelines for Storage, Handling, Use and Emergency Response For Hazardous Substances 7. Environmental monitoring plan B Guidelines for project facilities 1. Guidelines for siting, management and redevelopment of construction camps 2. Guidelines for siting, management and redevelopment of labour camps 3. Guidelines for siting, management and redevelopment of quarrying and stone crushing operations 4. Guidelines for siting, management and redevelopment of borrow areas 5. Guidelines for siting and management of debris disposal site The guidelines for project facilities have been structured with following objectives: (i) It facilitates the selection of a site with least environmental impact, (ii) It looks into the satisfaction of the land owner in case of leased out / rental out lands, (iii) It guides the Contractor with step by step measures in setting up of an efficient and environment friendly camp / site, (iv) It ensure smooth, safe and efficient functioning of these camps and sites (v) It guides the Contractor in preparing a camp / site management and restoration plan to be submitted to CSC (prior to setting up of the camp/site) (vi) It facilitates restoration of the site at the closure stage in a very environment friendly manner. EMP assigns the responsibilities for various actions identified to limit the adverse impacts of the project. An environmental monitoring plan and an institutional framework have been proposed as part of the EMP for proper implementation and monitoring of mitigation measures. The cost for implementing the proposed environmental mitigation measures and carrying out the environmental monitoring has been worked out and is presented as part of the EMP for necessary budgetary allocations as part of the project cost. In order to implement various environmental requirements during pre construction, construction and operational phases, all mitigation and enhancement measures have been clearly built in to the Environmental Management Plan. All necessary mitigation and enhancement costs have been part of the BOQ. Wilbur Smith Associates Pvt. Ltd. 1.5 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road 1.5.1. Lessons from Review of EMP Implementation, KSTP-I The major findings from the review of implementation of EMP for KSTP–I, conducted by Wilbur Smith Associates in 2010 are given below: Sl. No. Issues in implementation of EMP Measures incorporated in EMP for KSTP-II 1. Lack of commitment by Contractors Penalty clause is included in the contract document IE is helpless to take action against Contractor 2. Lack of awareness Training by CSC and KSTP 3. Too many reporting formats A simplified reporting and monitoring system has been evolved with fewer reporting frequency shared responsibility between Contractor and IE 4. Impractical instructions in EMP Unfeasible measures have been simplified – for eg,. Criteria of siting project facilities has been relaxed considering the topographic features of Kerala. Specific guidelines are added to enable the Contractor implement the EMP very effectively. 1.6. Definition of Terms Used in the Project Nodes: Nodes are numbered locations representing urban centres or important road junctions usually used for start or termination points for project roads. In the case of Link 5 project road node number of Ettumanoor is 56 and Moovattupuzha is 52. Links and Sub links: All project roads were identified by link numbers in the Project feasibility report of April 2000. According to this the 67 Links represented 2810 km of roads most of which were identified earlier by the Strategic Option Study (SOS) for detailed feasibility studies. Package: Packages are identified for the purpose of creating attractive construction contracts to National and International Contractors. A package average of 100 km of roads is made up of two or more Links. Contractors may not take interest in a contract if it is not of sufficient size Wilbur Smith Associates Pvt. Ltd. 1.6 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road and profitability to merit attention. A Contractor may bid for more than one contract package. There are five highway contract packages to be implemented in two phases, identified in the Kerala State Transport Project in addition to the KSTP-I Inland Water Transport (IWT) Pilot Project. ROW: The Right Of Way (ROW) is the land width legally available to the State PWD. The actual Right Of Way can only be established after the legal verification of all adjoining properties. The ROW is often encroached upon on one or both sides. ROW details were not made available to the consultants and were defined by the Client as that area determined by the physical appearance of the existing limits of the Highway, which has been open to the public for unrestricted access over many years. This aspect has been covered in detail in the RAP. Available Corridor: Since the legal ROW details are not available from the PWD, the consultants considered the existing corridor width that is physically available as defined above and referred to it as available corridor for the purpose of project preparation. Realignment: Realignment usually refers to an increase in the horizontal curve radius but may be generally applied to any change in the vertical or horizontal alignment of a road. Bypass: A bypass is the term usually applied to a road, which provides an alternative route around a congested urban area. This usually helps to divert through traffic away from the urban centre. Private trees: These are trees situated in private properties within the required corridor and which will need to be compensated in monitory terms according to the Resettlement Action Plan. Public trees: Public trees are those trees that are located within the available corridor of the PWD or on a Puramboke Land (no registered ownership but accounted as land of the Revenue Department). ‘OXBOW LAND’: This is the ROW that will be superseded during any realignment. This is a common occurrence on many roads in Kerala especially in the midlands and their creation is compared to the ‘Oxbow lake formation’ during the evolution of rivers. It is referred to as ‘Oxbow Land’ for easy identification of such areas for Environmental Management. There are numerous such existing oxbow lands remaining unutilized in the State. Wilbur Smith Associates Pvt. Ltd. 1.7 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Chapter 2. Project Description 2.1. Regional Setting of the Project Road The State of Kerala is located in the South-West of the Union of India. Presently there are 14 districts and 63 taluks in the State. The population density of the State is very high, 749 per sq.km. The State is bordered by the Arabian Sea on the West and South, the State of Tamil Nadu on East and Karnataka State to the North. The project road is located in the Kottayam and Ernakulam districts. The regional setting of the project road is shown in Figure 2.1. 2.2. Link Description The project road designated as Link 5, starts at chainage km 0.000 at Ettumanoor where the road proceeds towards north via Kothattukulam and ends at chainage km 40.128 at Moovattupuzha. Length of project road between Ettumanoor and Moovattupuzha is 40.128 km. The road is situated in the reaches of mid land and road passes through rolling terrain, the location details are given in Figure 2.2 below. Environmental Data Sheet Environmental data sheet comprises of chainage wise existing details of environmental and social features, road furniture details, location of cross drainage structures and water body and sensitive receptors details of the corridor (Link 5). Table 2.1 presents the Environmental Data Sheet for Link 5. Wilbur Smith Associates Pvt. Ltd. 2.1 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Ernakulam Kottayam Alappuzha Pathanamthita INDIA KERALA STATE Legend: Chengannur – Ettumanoor Road (Link 4) Ettumanoor – Muvattupuzha Road (Link 5) Figure 2.1. Regional Setting of the Project Area Wilbur Smith Associates Pvt. Ltd. 2.2 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Figure 2.2. Location Map of Ettumanoor – Moovattupuzha Road Wilbur Smith Associates Pvt. Ltd. 2.3 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Table 2.1. Environmental Data Sheet Road Code: SH - 1 Link No: 5 Road Name: Ettumanoor - Moovattupuzha Chainage: km 0.00 to km 41.000 Chainage Environmental and Social Features Bus Stops / Service Paddy Fields/ Hospitals / Schools Remarks From To Left Side (West side) of Right Side (East Side) of Roads / Market Areas Cross Drainage / Shrine / Auto / the Road the Road / Accident ‘Black (CD) Structures/ Taxi / Bus Stands Spots’ Water body 0 1 Built up area, Wells, Rock Built up area, Quarry Tapioca and Coconut Trees, Rock quarry, Rubber Plantation 1 2 Tapioca, Coconut Trees Rubber Plantation , Post Bus stop on right side School at left Library Office, Church, Shrine Accident prone area 2 3 Built up area, Rubber Built up area , Rubber Bus stop on left side Plantation Plantation 3 4 Rubber Plantation, Rock Rubber Plantation , shops Bus stop on right side Paddy field on right Quarry, temple, Village side , Paddy field on office left side, CD 3/4, 3/4A 4 5 Built up area , library, plantations Bridge, Paddy field School at right side Panchayath Office on right side, Paddy Auto stand at right field on left side, side CD 4/5 5 6 Agriculture Land, Agriculture Land, Church, Paddy field on right Tree Coconut Trees, Tree Coconut Trees, Temple, side , Paddy field on removal removal Tree removal, Rubber left side, CD 5/7 Plantation 6 7 Rubber Plantation Built up area, Shrine at right Bus stop on right side Paddy field on right Auto stand on right side , Post office at right side , Paddy field on side side left side, CD 6/8, 6/8A, 6/9/6/10 7 8 Agriculture Land, Wells, Built up area, Rubber Paddy field on left Rubber Plantation Plantation, Church, Tapioca side, CD 7/11-15 Wilbur Smith Associates Pvt. Ltd. 2.4 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Chainage Environmental and Social Features Bus Stops / Service Paddy Fields/ Hospitals / Schools Remarks From To Left Side (West side) of Right Side (East Side) of Roads / Market Areas Cross Drainage / Shrine / Auto / the Road the Road / Accident ‘Black (CD) Structures/ Taxi / Bus Stands Spots’ Water body 8 9 Built up area Built up area, Police station, CD 8/16 School at Left side, play ground, Post office Homeo Hospital Left side 9 10 Commercial Area Built up area, library at right Bus stop on right side CD 9/17-21 Auto stand on Left side Accident black spot side Auto stand on right side 10 12 Built up area, Tree Built up area Bus stop on right side Paddy field on both Tree removal sides, Bridge, CD removal Well 10/22-27, CD 11/28, 11/28A, 11/28B 12 13 Plantations, Shrine at Left Plantation, Church at right 2 Bus stop on right side Bridge, CD 12/29- Auto stand on Left side side , Post office 31, side 12/31A, 12/ 31B, 12/31C 13 14 Rubber Plantation Rubber Plantation, Coconut Bus stop on right side CD 13/32, Trees 13/32A,13/33 14 15 Built up area, Plantations Rubber Plantation, Natural Bus stop on right side Bridge, CD 14/34- stream 36A 15 16 Built up area, well, drain Built up area, Drain, Paddy field on right Village Office, Shrine side, CD 15/37-38 16 17 Agriculture Land, Built up area, Plantation, CD 16/39-40A School at right side Tree Coconut Trees Church on right side CD 16/41-43 removal 17 18 Rubber Plantation, Well, Rubber Plantation Bus stop on left side CD 17/44,17/44A- School at right side Coconut Trees D 18 19 Rubber Plantation, Rubber Plantation, Shrine, Bus stop on left side Tree Church, Quarry Valley removal 19 20 Rubber Plantation, Rubber Plantation, Valley, CD 19/45 Wilbur Smith Associates Pvt. Ltd. 2.5 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Chainage Environmental and Social Features Bus Stops / Service Paddy Fields/ Hospitals / Schools Remarks From To Left Side (West side) of Right Side (East Side) of Roads / Market Areas Cross Drainage / Shrine / Auto / the Road the Road / Accident ‘Black (CD) Structures/ Taxi / Bus Stands Spots’ Water body Church, Quarry Well 20 21 Tapioca, Rubber Coconut Trees, Tapioca, 2 Bus stop on right side Paddy field on left Tree Plantation, Buildings Drain side , CD 20/46 removal 21 22 Buildings, Rubber Built up area, Church, 2 Bus stop on right side CD 21/47 School at right side Plantation, Pepper Shrine at right side Plantation 22 23 Coconut Trees, Pineapple Coconut Trees, Rubber 2 Bus stop on left side Paddy field on left Plantations, Tapioca Plantation side, Paddy field on right side, Bridge CD 22/47-48A 23 24 Rubber Plantation, Buildings, Rubber Paddy field on left Tapioca, Coconut Trees Plantation, Well, Tapioca, side , CD 23/49- Shrine 51A 24 25 Built up area, Post Office, Built up area, Telephone Bridge, CD 24/52 Taxi stand at Left side Shrine Exchange, Shrine, Petrol , Auto stand on Left Pump, Church side 25 26 Commercial Area, Petrol Commercial Area, Bus stop on left side Hospital at Left side , Tree Pump, Church, Plantation Pineapple plantations, School at Left side , removal Drain Auto stand at Left side 26 27 Tree removal, Rubber Areca nut Plantations, Paddy field on right Tree Plantation, Tapioca, Coconut Trees side, CD 26/53-54 removal Drain, Coconut Trees 27 28 Coconut Trees Buildings, Rubber Bus stop on left side CD 27/57 School at right side Tree Plantation, Temple, Tree removal removal 28 29 Coconut Trees, Tree Tree removal, Rubber Bus stop on left side Bridge, Paddy field Tree removal, Tapioca, Drain Plantation, Church Bus stop on right side on left side , CD removal 28/58 Wilbur Smith Associates Pvt. Ltd. 2.6 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Chainage Environmental and Social Features Bus Stops / Service Paddy Fields/ Hospitals / Schools Remarks From To Left Side (West side) of Right Side (East Side) of Roads / Market Areas Cross Drainage / Shrine / Auto / the Road the Road / Accident ‘Black (CD) Structures/ Taxi / Bus Stands Spots’ Water body 29 30 Drain, Rubber Plantation, Pineapple plantations, Built Accident black spot Paddy field on right Other Plantations up area , Coconut Trees Bus stop on right side side , CD 29/59- 61A 30 31 Rubber Plantation, Built Rubber Plantation, Built up Bus stop on left side CD 31/62-63A School at Left side - up area, Drain area, Drain, Church 31 32 Drain, Rubber Plantation Rubber Plantation, Coconut Paddy field on left Trees, Tree removal side, Bridge, CD 31/64-65 32 33 Rubber Plantation, Rubber Plantation, Coconut Bus stop on left side CD 32/66, Pineapple Plantations, , Trees, Mixed crops 32/66A,32/67A Buildings, Drain 33 34 Rubber Plantation, Rubber Plantation, Play Bus stop on right side CD 33/68-69A Tree Church, Shrine ground, Valley removal 34 35 Church, Valley, Shrine, Rubber Plantation, Library, Bus stop on left side CD 34/70 School on Left side Tree Rubber Plantation Trees, Coconut Trees removal 35 36 Rubber Plantation, Rubber Plantation, Tapioca, Bus stop on left side Natural water body Tree Coconut Trees, Pineapple Pineapple plantations, Tree crosses the road removal plantations, Built up area removal CD 35/71-72 36 37 Built up area, Rubber Built up area, Coconut Market at Left side , Bus Paddy field on right Plantation, Drain Trees, Church, Auto stand , stop on right side side, Natural water Coconut Trees, Pineapple body on both sides plantations CD 36/73,73A,73C 37 38 Mixed crop, Well Built up area, Church, CD 37/74 Shrine, Areca nut, Coconut Trees , Pineapple Plantations, Mosque 38 39 Plantations, Valley Rubber Plantation, Coconut Accident black spot CD 38/75, 75A-D Tree Trees, Tree removal removal 39 40 Built up area, Coconut Rubber Plantation, Mixed Bus stop on left side Natural drain on Wilbur Smith Associates Pvt. Ltd. 2.7 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Chainage Environmental and Social Features Bus Stops / Service Paddy Fields/ Hospitals / Schools Remarks From To Left Side (West side) of Right Side (East Side) of Roads / Market Areas Cross Drainage / Shrine / Auto / the Road the Road / Accident ‘Black (CD) Structures/ Taxi / Bus Stands Spots’ Water body Trees crops, Natural Drain right side 40 41 Built up area, Rubber Built up area, Tree removal CD 40/76,40/76A Hospital on left side Tree plantation Bus stop on right removal side 41 42 Commercial Area Built up area Bus stop on right side CD 41/77 Auto/Taxi parking on right side, Hospital at right Wilbur Smith Associates Pvt. Ltd. 2.8 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road 2.3. Proposed Project Improvements Study mandates the improvement of the project road to two lane with paved shoulder standards with other improvements to make the road a standard facility. Improvement proposals formulated are based on the IRC guidelines and site specific requirements. The proposed improvements are aimed at easing traffic congestion, reducing the road accidents by improving physical characteristics of the road, which includes geometry, pavement strength, drainage, and enhancing the aesthetics. General philosophy followed in formulating the improvement proposals are:  Limit the improvements within the land identified for the project.  Introduce transition to all the curves along the alignment  Utilize the available Right of Way to the maximum extent possible so as to avoid additional land acquisitions  Retain the geometric properties of finalized alignment during the study carried out in 2002  Improve and introduce the project facilities  Improvement of road safety features Accordingly, the following optimum level of improvements is proposed:  Widening of the project road as the traffic warrants;  Strengthening/reconstruction of the existing pavement for the entire length;  Provision of footpath cum built-up drain at built up and industrial locations;  Improving / redesigning sharp curves;  Widening/ reconstruction of existing culverts and provision of additional culverts depending on the cross drainage requirements;  Bridge and cross drainage rehabilitation, widening and reconstruction.  Junction improvements;  Provision for pedestrian crossing facilities;  Provision of traffic signs and road furniture;  Provision of bus shelters Based on the above improvements, realignments are proposed at eight locations. The details of corresponding realignments locations are given in the Table 2.2. Except at km 31+450 at Areekuzha, oxbow land development is not recommended at remaining realignment locations, due to the Social and R&R issues. At km 31+450 at Areekuzha, a type A oxbow land is proposed for improvement, which will be taken up by KSTP separately. Table 2.2. Proposed Realignment Locations for the Project Sl. Proposed Chainage Length Existing Chainage Length Type of Oxbow Land No. Start End in m Start End in m (Type A, B & C) 1 2+160 2+330 170 2+180 2+445 265 Nil 2 2+560 2+915 355 2+680 3+090 410 Nil 3 25+690 30+660 4970 25+950 31+090 5140 Nil 4 31+300 31+700 400 30+880 31+280 400 Type A 5 32+245 32+560 315 32+675 33+080 405 Nil Wilbur Smith Associates Pvt. Ltd. 2.9 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. Proposed Chainage Length Existing Chainage Length Type of Oxbow Land No. Start End in m Start End in m (Type A, B & C) 6 33+920 34+230 310 34+440 34+800 360 Nil 7 37+770 38+290 520 38+350 38+975 625 Nil 8 38+665 39+120 455 39+360 39+900 540 Nil Total Proposed Length in m 7495 Total Existing Length in m 8145 Total Project Length Increased/ Decreased in m -650 The suitability of the Puramboke land/oxbow land for various purposes depends upon the location, namely whether it is located in rural, semi urban, or urban areas. Hence, it has been decided by KSTP, to develop these lands in consultation with other state government departments, so that the proposed activity will be socially and economically feasible and sustainable in the long run. Accordingly, only type C enhancement measure (where space is limited and buildings are not proposed) will be undertaken at present, as it involves only tree planting, seating parking and solid waste collection facilities. Other enhancement types – A and B – will be taken up at a later stage by KSTP as a separate activity. No type B & type C oxbow land is present in Link 5. Only one type-A oxbow land will be developed along Ettumanoor – Moovattupuzha link road. Criteria for opting of oxbow land types are given in Annexure 3.50. 2.4. Environmental Enhancement Measures Adopted in the Project General environmental enhancement measures proposed for the project are construction of sound insulating stone wall to abate sound at silent zone, providing hand pump facility, reconstruction of affected open well, planting trees on the inner side of the sound insulating wall as noise barrier at sensitive locations, planting trees on both sides of the road at places where land available, landscaping of junctions etc., Apart from this, public utilities such as construction of bus shelters at bus bys locations, providing parking facilities for autorickshaws, taxis, jeeps and tempos, signboards indicating prominent locations along project road and improvement of parks and gardens will be undertaken along the project corridor. The environmental impact mitigation measures and enhancement measures proposed are covered under Link Specific EMAP and the typical design drawings are provided as Annexure 3.53. The landscaping, tree planting, shrub planting etc. are provided as an environmental enhancement measure in oxbow land and along project road as shown in Annexure 3.50 and 3.53. The specification for oxbow land development will be provided to the Contractor as and when required. The value of such areas will be further increased if located close to any tourist attractions, or Pilgrim/religious centres. The envisaged improvements are of three types as provided in Annexure 3.50 Landscaping, Tree planting and Environmental Enhancement Plan. Wilbur Smith Associates Pvt. Ltd. 2.10 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Chapter 3. Environmental Management Action Plan 3.1. Introduction Environmental mitigation measures have been incorporated within the design process, including the avoidance of potential impacts through changes in the alignment and other means. Appropriate measures have also been identified for action in the construction and operational phases. Table 3.1 and Table 3.3 tabulates the measures identified for all phases i.e., the design, pre-construction, construction and operational phases, identifies the nature of the potential environmental impact, the measures, which have, or will be taken, the implementing agency and responsible organisation, and, where appropriate, the contractual clause or drawing no. referring to the measure. The Table 3.1 and Table 3.2 called ‘Generic EMAP’ lists those measures, which are common to all roads, while Table 3.3 and Table 3.4 called ‘Link Specific EMAP’ lists those measures which are specific to this link. The EMAP can also classified based on responsibility of implementation of mitigation measures such as EMAP for PMT, CSC and others i,e., Table 3.1 and Table 3.3 and EMAP for Contractor i,e., Table 3.2 and Table 3.4. EMAP for PMT, CSC and others includes stake holders comprises of planning department, local police & fire station, state motor vehicle department and other organisations which are directly or indirectly associated with the project. EMAP for Contractor will be monitored by CSC/ PMT. The role and responsibility of the responsible organisations mentioned in the table are mentioned below. State Pollution Control Board (SPCB)- The State Pollution Control Board will be responsible for any matters related to air, water and noise pollution during construction and operational stages. Any matters related to this may be brought under their notice for solution. Forest Department- Any matters related to social forestry, forests, wildlife and trees etc should be consulted with the local DFO or Forest Range Officer, Forest Department depending upon the advice required. PMT and PWD- PMT will be available only in the State head quarters at Thiruvananthapuram. Most of the work in the local level will be taken care of at the local PWD/PMT level through out Kerala. Final Design Consultant- Preparation of final road designs and contract documentation based on the preliminary road designs and the formulation of the Environmental Management Plan and Environmental Management Action Plan recommendations. Environmental Engineer of PMT- EE will be responsible for all matters of environmental monitoring and inter Governmental coordination. Traffic Police and State Police- any matters related to traffic and violation of traffic and other law and order issues may be taken up with the traffic police and State Police. Kerala Water Authority- The Kerala Water Authority (KWA) will be responsible for any matters relating to water supply, water taps, bore wells and tube wells along the sides of the roads. Wilbur Smith Associates Pvt. Ltd. 3.1 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Water Resources  Department- The water resources department will be responsible for all matters relating to rivers, canals, waterways and irrigation canals. Local bodies (Panchayat and Municipal Authorities)- Panchayat and Municipal authorities will be responsible for local bus waiting sheds, Panchayat and municipal public wells etc. Motor Vehicle Department- The motor vehicle department will be responsible for the issue and matters relating to Pollution Under Control Certificates, driving licences etc. Fire Force and Fire Station- the matters relating to safety especially relating to fire safety may be taken up with the Fire force. Archaeological Department- All matters relating to ancient archaeological structures and historical monuments that may encounter during construction works or identified during pre- construction stage. Mining and Geology Department- All matters relating to quarry and sand materials may be referred to State Mining and Geology Department. 3.2. Penalty Clause for Nonconformity to EMP Clause No. Description Sub-Clause 14.6: The Contractor shall implement all mitigation measures for which responsibility is Protection of the assigned to him as stipulated in the EMP Report. Any lapse in implementing the Environment same will attract the penalty clause as detailed below: 1. All lapse in obtaining clearances / permissions under statutory regulations and violations of any regulations with regard to eco-sensitive areas shall be treated as a major lapse. 2. Any complaints of public, within the scope of the Contractor, formally registered with the CSC, or with the PWD complaint cell and communicated to the Contractor, which is not properly addressed within the time period intimated by the CSC / PMT shall be treated as a major lapse. 3. Non-conformity to any of the mitigation measures stipulated in the EMP Report (other than stated above) shall be considered as a minor lapse. 4. On observing any lapses, CSC shall issue a notice to the Contractor, to rectify the same. 5. Any minor lapse for which notice was issued and not rectified, first and second reminders shall be given after one month from the original notice date and first reminder date respectively. Any minor lapse, which is not rectified shall be treated as a major lapse from the date of issuing the second reminder. 6. If a major lapse is not rectified upon receiving the notice, CSC shall invoke the penalty clause, in the subsequent interim payment certificate. 7. Penalty for major lapses shall be with-holding of 10% of the interim payment certificate, subject to a maximum limit of Rs. 30 lakhs. 8. If the lapse is not rectified within three months after withholding the payment, the amount withheld shall be forfeited.  Formerly Irrigation Department Wilbur Smith Associates Pvt. Ltd. 3.2 Kerala State Transport Project Public Works Department Kerala State Transport Project - II Draft EMP for Ettumanoor - Moovattupuzha Road Table 3.1. Part-I Generic Environmental Management Action Plan for PMT, CSC and Others Sl. No. Activity Management and Mitigation Measures Implementing Monitoring References Organisation Organisation A. Project Preparation Phase A.1. Preparation of Mitigation Measures for Impacts on Land and Water Detailed Project Proposed alignment is designed minimizing land requirement, RoW is Design PMT EMAP Report kept to a minimum, avoiding religious buildings and other Consultant environmentally sensitive areas. Guidelines for sitting, management and redevelopment of project related Design PMT EMAP facilities by the Contractor are presented in Annexure 3.1 to Annexure Consultant 3.5. Erosion control measures like compaction of earth, pitching, turfing and Design PMT EMAP landscaping with adequate drainage are included in engineering design. Consultant Apart from this, geo-textile material shall be used at reclamation of paddy/ marshy land to avoid soil erosion. Slope stabilization and erosion control measures like compaction of Design PMT EMAP earth, pitching, turfing, construction of retaining wall, stabilization of soil Consultant using geo-textile material and landscaping with adequate drainage system such as slope drains and storm water drains are included in the engineering design. Concrete flooring, catch drain and oil interceptors are proposed for hot Design PMT EMAP mix plant area, work shop, vehicle washing area and fuel handling area in Consultant construction camps as presented in drawing no. CE -10-60-11 Sufficient number of drainage structures like culverts, storm water Design PMT EMAP drains etc. are included in the engineering design to prevent flooding Consultant and water logging. Bridges have been designed for the 50-year flood frequency. All culverts have been designed for 25 years flood frequency. The fill height has been designed for 50-year flood. Mitigation Measures for Impacts on Water Sedimentation trenches and storm water drain are proposed for Design PMT EMAP surface runoff from construction camps as per the design presented in Consultant Wilbur Smith Associates Pvt. Ltd. 3.3 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring References Organisation Organisation drawing no. CE -10-60-12. Toilets, sewage collection system and soak pits are proposed in Design PMT EMAP construction camps, labour camps. Consultant Mitigation Measures for Impact on Air and Noise Tree plantation along road and oxbow land is included in the design. Design PMT Consultant Mitigation Measures for Impacts on Noise Sensitive noise receptors along the project stretch are identified and noise Design PMT EMAP barriers are proposed at these locations as per design given in Annexure Consultant 3.44. Mitigation Measures for Impacts on Flora and Fauna Plantation of three trees for every tree to be cut has been proposed as Design PMT & PCC EMAP per the guidelines of MoEF. Consultant Mitigation Measures for Socio-economic impacts Proposed alignment is selected minimizing socio-economic impact. PMT PMT EMAP Information dissemination and community consultation has been NGOs Environment undertaken. recommended in Officer (EO) It is proposed to pay compensation to PAPs based on the RAP that RAP includes the Entitlement Policy. Proposed alignment has been adjusted to minimize impact on religious Design NA EMAP and cultural properties. Consultant Cultural properties along the alignment have been identified and Design PMT EMAP proposed to relocate prior consultation and approval of the local Consultant community. All community utilities such as stand posts, bore wells, wells, ponds, Design PMT and PWD EMAP water supply lines, toilets, sewerage lines, drainage systems, optical fiber Consultant cables, electric power supply lines, transformers, irrigation pump houses, telephone and television cables have been identified for relocation. Cost Wilbur Smith Associates Pvt. Ltd. 3.4 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring References Organisation Organisation of shifting the utilities are included in the project cost. It has been proposed to replace private dinking water source according Design PMT and PWD EMAP to RAP and public water sources according to EMAP. It has also been Consultant proposed to make temporary arrangements if the existing water supply is disrupted. Road stretches which are accident prone and have adverse factors are Design PMT and PWD EMAP identified and necessary design measures like improvement of Consultant horizontal and vertical road geometry, improvement of junctions, etc. are adopted for road safety. Refer Annexure 3.33. Sign boards, street lights and pedestrian facilities are proposed for the entire stretch. Existing bus stops have been suitably relocated or integrated to the Design PMT and PWD EMAP design and bus lay bys, bus waiting shed and parking facilities for taxi, Consultant autorikshaw and tempo designs has been provided. Improved road surface with improved road geometry, pedestrian Design PMT and PWD EMAP facilities bus bays and road furnitures have been planned. Consultant Traffic Police Signages have been given a high priority for all road junctions. Safety audits have been undertaken and corrective measures undertaken. Mitigation Measures for Impacts due to Solid Waste Generation Demolition of sound highway structures has been avoided as far as Design PMT and PWD EMAP possible by reinforcing them instead of replacing with new structures. Consultant Recycling / reuse of debris in highway construction has been considered wherever possible. A.2. Consent for Application for Consent for Establishment has to be submitted to PMT and PWD PMT and PWD Water Establishment KSPCB. (Prevention & Control of Pollution) Act, 1974 Air (Prevention & Wilbur Smith Associates Pvt. Ltd. 3.5 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring References Organisation Organisation Control of Pollution) Act, 1981 A.3. Training Environmental Awareness Training. PMT and PWD PMT and PWD EMAP EMP Implementation Training. Environmental legislation training. Training for Contractors. CSC / PMT PMT and PWD EMAP B Pre-construction Phase B.1. Environmental This will include institutional requirements, training, environmental EO of PMT, CSC EO of PMT, As a Project Monitoring Facility management and monitoring. Provision for purchasing required SPCB specific action and Equipment equipment. this will have (Meters, Vehicles and to be Buildings) incorporated. B.2. Identification of sites Mitigation Monitoring during Siting of Project Facilities for project facilities The suitability of identified site should be verified based on the reports CSC PMT like construction submitted by the Contractor from time to time by the CSC through site camp, labour camp, visit and verification of records. This shall be a one time activity for each quarry, crusher unit, newly identified site, based on which the approval for the site shall be borrow areas, debris issued by CSC to Contractor. and excess soil disposal B.3. Setting up of all Mitigation Monitoring during Setting up of Project Facilities project facilities like CSC to monitor using checklists provided in Annexures 3.20 to 3.24, CSC PMT EMAP construction camp, and through site inspection and records verification, whether the camps labour camp, quarry, are being set up in line with the camp / site management plan borrow area and submitted by the Contractor. debris disposal site, CSC to monitor using checklists provided in Annexure 3.24a, and preparation along through site inspection and verification of records, whether the traffic project stretch management plan is being executed in an appropriate way. B.4. Clearing, grubbing Mitigation Monitoring during Site Preparation Wilbur Smith Associates Pvt. Ltd. 3.6 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring References Organisation Organisation and stripping, cutting CSC to monitor through site visits, whether the mitigation measures CSC PMT EMAP of earth, filling, outlined in EMAP are adhered to. stripping, demolition C. Construction Activities C.1. Operation of Mitigation Monitoring During Construction Stage construction camp, CSC shall continue to monitor all the project facilities once in a CSC PMT EMAP quarry, stone crusher quarter using checklists in Annexures 3.20 to 3.24. units, borrowing of CSC shall continue to monitor all the construction activities using earth and functioning checklists given in Annexures 3.25 to 3.29. of labour camps Reporting format for monthly report which has to be submitted to PMT by CSC is given in Annexure 3.39. Noise level monitoring should be conducted as per Environmental CSC PMT EMAP Monitoring Plan. C.2 Construction of the Oversee the precautionary measures implemented by the contractor to CSC and Local PMT EMAP road reduce the inconvenience to the public/ pilgrims during the nine- Self Government month pilgrimage period spread over three successive years. Continue the monitoring, using checklists provided in Annexure 3.24a, and through site inspection and verification of records, whether the traffic management plan is being executed in an appropriate way. D. Post construction / Operational Phase D.1. Redevelopment of CSC to monitor using checklists provided in Annexures 3.20 to 3.24, CSC PMT EMAP construction and and through site inspection and records verification, whether the camps / labour camp sites, sites are redeveloped in line with the camp / site redevelopment plans quarry and crusher submitted by the Contractor. sites and borrow Proper implementation of traffic rules. Pollution Under Control (PUC) PMT Traffic police EMAP areas. certificates should be undertaken. Proper maintenance of traffic signs and implementation of accident care PMT Traffic police EMAP facilities along the road should be undertaken. The cross drainage system and the flood water drains should be PWD PWD and EMAP periodically cleared to avoid occurrence of floodings. Drainage systems ULBs should be maintained well to accommodate proper storm water flow. Wilbur Smith Associates Pvt. Ltd. 3.7 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring References Organisation Organisation Contingency plans should be in place for clean up of spills of oil, fuel and PWD, state police PWD, state EMAP toxic chemicals. and fire station police Public should be informed about the regulations on air pollution of State Motor State Motor EMAP vehicles. Vehicles Vehicles Dept. Department. and PMT Noise monitoring to be undertaken along the project stretch at pre- PMT PMT EMAP identified locations using the noise metre of KSTP as specified in Environmental Monitoring Plan. New buildings are prohibited within 50 mts of the carriageway. Town & Country EMAP Planning PMT Department, local governing body Where ever required appropriate noise barrier should be constructed. Town & Country EMAP Planning PMT Department, local governing body COMPLIANCE with “Rules� as defined in Environmental (Protection) PWD PMT, PWD EMAP Act, 1986, including: For delivery of hazardous substances, three Motor Vehicle certificates issued by transportation department are required - permit Dept., State license, driving license, and guarding license. Vehicles delivering police and Fire hazardous substances should be printed with standard signs. Public Services security, transportation and fire fighting departments should designate a special route for these vehicles. These vehicles should be parked only at designated parking lots. In case of spill of hazardous materials, relevant departments should be informed at once and deal with it in accordance with the spill contingency plan. Safety Audits should be conducted. PMT, PWD, PMT, PWD NA Traffic police Wilbur Smith Associates Pvt. Ltd. 3.8 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Table 3.2. Part-II Generic Environmental Management Action Plan for Contractor– Preconstruction Phase, Construction Phase and Operational Phase Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation A. Pre-construction phase A.1. Identification of sites Mitigation Measures to be adopted at Siting Stage to Minimise for project facilities all types of Impacts like construction Locate the camp as per detailed site selection criteria given in Contractor CSC MoRTH camp, labour camp, Annexure 3.1 to Annexure 3.5. The details of identified sites should Specification quarry, crusher unit, be reported to the Construction Supervision Consultant (CSC) for 111.1 borrow areas, debris approval in the format given in Annexure 3.12 to Annexure 3.19. and excess soil disposal An agreement has to be signed with the land owner, if the land is Contractor CSC MoRTH taken on lease / rent. The agreement should specify the preferences Specification of land owner about land re-development while handing over the site 111.1 back to him. Camp / site2 Management and Redevelopment Plan should be Contractor CSC MoRTH prepared as per guidelines given in Annexure 3.1 to Annexure 3.5 Specification and submitted to CSC for approval. Activities in the site should be 111.1 initiated only after getting written approval from CSC. Comprehensive Waste Management Plan, Occupational Health and Contractor CSC MoRTH Safety Management Plan and Hazardous Substances Management Specification Plan should be prepared as per guidelines given in Annexure 3.6, 111.1 Annexure 3.9 and Annexure 3.11. Obtain required permissions before setting up the camp as per the Contractor CSC MoRTH details given in Annexure 3.40. Specification 111.1 2 Includes construction camp, labour camp, quarry and crusher unit, borrow area and debris disposal site. Wilbur Smith Associates Pvt. Ltd. 3.9 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation Site for overburden disposal should be planned within the quarry site Contractor CSC MoRTH or any other appropriate site. Quarry Management and Specification Redevelopment Plan should address the disposal of overburden. 111.1 Borrow Area Management and Redevelopment Plan should address Contractor CSC MoRTH the water logging issue. Specification 111.1 Record the number of trees to be cut in each site and make provision Contractor CSC MoRTH in the Management and Redevelopment Plans to plant three times the Specification number of trees to be cut. 111.1 Reporting format for monthly report which has to be submitted to Contractor CSC EMAP CSC by Contractor is given in Annexure 3.38. Reporting format for work force management which has to be submitted to CSC by Contractor is given in Annexure 3.30. A.2. Identification of Mitigation Measures for Impacts on Ground Water water sources Only surface water should be used for construction and dust Contractor CSC MoRTH suppression. Possibility of using treated industrial water for dust Specification suppression should be explored. Details of identified water sources 111.1 should be submitted to CSC for approval in the format given in Annexure 3.17. Water for domestic use should be sourced from municipal water Contractor CSC MoRTH supply / approved water suppliers/ open well/ bore well. Specification Clearance should be obtained from State Ground Water Board for 111.1 construction of wells. Permission from relevant state authority (PWD / Irrigation dept.) should be obtained for surface water utilization. Mitigation Measures for Socio-Economic Impacts Wilbur Smith Associates Pvt. Ltd. 3.10 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation Extraction of water from public water supply schemes, community Contractor IE MoRTH spring water sources, community hand pumps, and community wells Specification should be avoided. Local community should be consulted (with 111.1 respect to the quantity of water, time and duration of withdrawal) before finalizing the surface water sources. B. Construction Phase B.1. Site Preparation Activities B.1.1. Setting up of all Mitigation Measures for Impacts on Land and Water project facilities like Topsoil conservation to be carried out as per guidelines given in Contractor CSC MoRTH construction camp, Annexure 3.7 before setting up the project facilities. Specification labour camp, quarry, 111.4 borrow area and Once the project facility is setup, it should be entered in the register Contractor CSC MoRTH debris disposal site of sites given in Annexure 3.19 in a chronological order. Specification 111.1 Concrete flooring with catch drain and oil interceptors should be Contractor CSC BOQ No. 11 constructed for hot mix plant area and work shop, vehicle washing and fuel handling area in construction camps and should be part of construction camp management plan as per the design presented in Drawing no. CE-10-60-11. Sedimentation trenches should be constructed along the storm water Contractor CSC MoRTH drain in the construction camp as presented in Drawing no. CE-10- Specification 60-12 to control soil erosion due to surface run off. 111.4 Proper maintenance of vehicles and machineries should be carried out Contractor CSC Hazardous to minimize the spillage of oil. Provision should be made for storage Wastes of used oil. Authorization should be obtained from the SPCB under (Management Hazardous Waste (Management, Handling and Transboundary and Handling) Movement) Rules, 2008 for collection, storage and disposal of Rules, 2008 / hazardous wastes. PART II: MoRTH Specification Wilbur Smith Associates Pvt. Ltd. 3.11 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation 111.4 Adequate no. of toilets with sewage collection system and septic tanks Contractor CSC MoRTH and soak pits should be provided separately for males and females in Specification construction camps and labour camps. 111.1 Setting up of all Management Plans approved by the CSC should be strictly adhered to Contractor CSC MoRTH project facilities like while setting up the sites and camps. Specification construction camp, 111.1 labour camp, quarry, Permissions Contractor CSC MoRTH borrow area and Obtain required permissions before starting the operation of the Specification debris disposal site camp as per the details given in Annexure 3.40. 111.1 (Contd. from above) Contour trenches should be made around the quarry and crusher as Contractor CSC MoRTH presented in Drawing no. CE-10-60-13 to catch the sediments in Specification surface run off and prevent surface water pollution. 111.3 Minimum distance of any sewage or toilet facility from water sources Contractor CSC MoRTH should be 60 metres. Specification 111.1 Mitigation Measures for Impacts on Air and Noise Arrangements should be made for regular sprinkling of water for dust Contractor CSC MoRTH suppression in construction camp, quarry areas, stone crushing units, Specification access roads and borrow areas to control the air pollution due to dust. 111.1 All dust producing units should be housed in a building with suitable Contractor CSC MoRTH wall, roofing and flooring. Dust extraction units with a collection Specification system should be provided in the crusher unit and all transfer points. 111.8 Roads inside the construction camp and stone crusher premises Contractor CSC MoRTH should be paved. Specification 111.1 All the vehicles should have Pollution Under Control certificate Contractor CSC MoRTH Specification 111.1 Wilbur Smith Associates Pvt. Ltd. 3.12 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation Stack height and emission level of diesel generator in construction Contractor CSC MoRTH camp and crusher should meet the Kerala SPCB guidelines to reduce Specification air pollution. 111.1 Setting up of all Hot mix plants should have the latest, advanced pollution control Contractor CSC MoRTH project facilities like measures available in the country. Specification construction camp, 111.5 and labour camp, quarry, Section IX borrow area and Particular debris disposal site Conditions (Contd. from above) (PC) Part B – Special Provisions, Sub clause 21.0 Stack height and emission level of hot mix plants should meet the Contractor CSC MoRTH KSPCB guidelines. Specification Diesel generator should have noise control measures to meet the 111.5 and noise standards set by Central Pollution Control Board (75 dB(A) at 1 System & m from the enclosure surface for generators with integral acoustic procedures for enclosure. Acoustic enclosure for generators without integral acoustic compliance enclosure shall be designed for minimum 25 dB(A) insertion loss or with noise for meeting the ambient noise standards, whichever is on the higher limits for DG side at 0.5 m from the enclosure). Sets upto 1000 KVA, CPCB, 2008. Noise level of vehicles used for construction activities should meet Contractor CSC Environment the noise standards set by Central Pollution Control Board (maximum Protection 80 dB(A)). (Amendment) Rules, 2005 Mitigation Measures for Impacts on Biological Environment Wilbur Smith Associates Pvt. Ltd. 3.13 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation Green belt development along the camp boundary should be Contractor CSC MoRTH undertaken. No. of trees planted should not be less than three times Specification the number of trees cut. 111.1 LPG should be provided for cooking to avoid firewood collection Contractor CSC MoRTH from forest or nearby areas. Specification 111.1 Mitigation Measures for Socio - Economic Impacts Safe drinking water and sanitation facilities comprising toilets, sewage Contractor CSC MoRTH collection system and septic tanks should be made available to the Specification construction workers in all the camps and sites. 111.1 Setting up of all Personal protective equipments such as ear plugs, helmets, goggles, Contractor CSC MoRTH project facilities like gloves etc. should be made available to the workers in construction Specification construction camp, camp, quarry areas, stone crusher unit and borrow areas. 111.1 labour camp, quarry, Labour camps should not be constructed with inflammable materials. Contractor CSC MoRTH borrow area and Fire safety standards should be followed in both construction camp Specification debris disposal site and labour camp construction. 111.6 (Contd. from above) Fire fighting equipments like fire extinguishers shall be provided in Contractor MoRTH CSC the camp as per fire safety standards. Specification 111.1 Fencing should be provided for all the camps and sites to prevent Contractor CSC MoRTH trespassing of humans and animals into the camp. Specification 111.1 Operation manuals and training should be provided to machine Contractor CSC MoRTH operators. Warning signs should be placed at accident prone areas. Specification 111.1 Other provisions to ensure worker’s safety shall be followed as per Contractor CSC MoRTH guidelines given in Annexure 3.9. Specification 111.6 Mitigation Measure for Impacts due to Solid Waste Generation Wilbur Smith Associates Pvt. Ltd. 3.14 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation There should be provision of adequate space in all the camps and sites Contractor CSC MoRTH for segregated waste collection and waste handling. Specification 111.1 There should be provision of separate waste bins for bio-degradable, Contractor CSC MoRTH non-degradable and domestic and hazardous waste in the camps / Specification sites. 111.1 Comprehensive waste management plan to be prepared based on Contractor CSC MoRTH the guidelines given in Annexure 3.6. Specification Debris / solid waste should be disposed in debris disposal site 111.10 approved by CSC and based on the comprehensive waste management plan. B.1.2. Clearing, grubbing Mitigation Measures for Impacts on Land and Water and stripping, cutting Topsoil conservation should be undertaken as per guidelines given in Contractor CSC MoRTH of earth, filling, Annexure 3.7 to prevent its loss. Specification demolition 111.4 Three times the no. of trees cut should be planted, wherever space is Contractor CSC BOQ No. 11 available along the road and in identified oxbow lands. The plants should be provided with adequate protection from Contractor CSC MoRTH animals and proper monitoring shall be carried out to ensure their Specification survival and growth. 111.1 Landscaping should be done with a lag of 3 to 4 months from the start of the work on any section. The section shall be deemed to be completed when the landscaping is over. Avoid dumping of earth into canals, drainage channels and water Contractor CSC MoRTH bodies. Earth, stone or any other construction material shall be Specification properly disposed off safely so that the flow of water in cross 111.1 drainage channels is not blocked. As far as possible avoid earthworks construction activity during Contractor CSC MoRTH monsoon. Specification 111.4 Wilbur Smith Associates Pvt. Ltd. 3.15 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation If any existing irrigation and drainage system ponds are damaged, they Contractor CSC MoRTH shall be suitably repaired. Specification 111.4 Mitigation Measures for Impacts on Air and Noise Water should be sprinkled to suppress dust during any dust generating Contractor CSC BOQ No 11 activity. For cutting of rocks, instead of mechanical blasting, rock cutting Contractor CSC MoRTH process should be carried out to reduce the noise pollution. Specification 111.1 Machinery and vehicles should be well-maintained to keep their Contractor CSC MoRTH noise to a minimum. Specification 111.1 Mitigation Measures for Socio-Economic Impact Provide adequate signages and cordon off the activity area so as to Contractor CSC MoRTH ensure the safety of the pedestrians and passers by. Specification Temporary access should be maintained throughout the course of 111.1 the work unless the Contractors make agreements with any affected frontages or legitimate road user. Mitigation Measures for Impacts due to Solid Waste Generation Tree wastes should not be burned at site. They should be disposed Contractor CSC MoRTH off at debris disposal site or sold off as firewood. Specification Over burden to be disposed off in the sites identified for the same 111.1 as per the Comprehensive Waste Management Plan prepared based on guidelines given in Annexure 3.6. B.1.3. Demolition Sprinkling of water should be carried out on site to suppress Contractor CSC BOQ No. 11 fugitive dust emissions. Debris to be disposed off in the sites identified for the same as per Contractor CSC MoRTH guidelines given in Annexure 3.5. Specification 111.10 B.2. Construction Activities Wilbur Smith Associates Pvt. Ltd. 3.16 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation B.2.1 Operation of Mitigation Measures for Impact on Land and Water construction camp, Proper maintenance of vehicles and machineries should be carried Contractor CSC MoRTH quarry, stone crusher out to minimize the spillage of oil. Maintenance should be carried Specification units, borrowing of out on impervious platforms with spill collection provisions. Oil and 111.4 earth and functioning grease waste generated from garages in construction camps should of labour camps be drained out through catch drains and oil interceptors. Vehicle maintenance and refueling should be confined to areas in construction camps designed to contain spilled lubricants and fuels. Sanitation facilities, storm water drainage, catch drains and oil Contractor CSC MoRTH interceptors should be maintained properly. Specification 111.1 Management plans prepared for all project facilities and approved by Contractor CSC MoRTH the CSC should be strictly adhered to. Specification 111.1 Adequate care should be taken so that natural drainage patterns are Contractor CSC MoRTH not altered or blocked, while quarrying, borrowing, disposing off the Specification over burden or any debris. 111.1 Mitigation Measures for Impacts on Air Emission levels of all vehicles, plants and machineries should be Contractor CSC MoRTH well within the prescribed limits. PUC certificates of all vehicles and Specification machineries should be renewed at required intervals. 111.8 Mixing equipment should be well sealed, and be equipped with a dust-removal device. Filtering mechanisms like air filter and water filter should be operational. Roads inside the construction camp and crusher premises should be Contractor CSC MoRTH tarred or concreted. Specification 111.1 Wilbur Smith Associates Pvt. Ltd. 3.17 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation Water sprinkling should be undertaken for dust suppression. Contractor CSC BOQ No.11 Provide sufficient water storage facility for 2 days use. LPG should be provided for cooking and use of fire wood for Contractor CSC MoRTH cooking or any other purpose should be strictly banned. Specification 111.1 Air quality monitoring should be conducted at hot mix plant, quarry Contractor CSC PART II: site and crusher location as per Environmental Monitoring Plan so MoRTH that appropriate measures are taken up towards abatement of Specification pollution. 111.1 Mitigation Measures for Impacts on Noise In construction camp: Vehicles used for construction activities Contractor CSC Environment should be maintained well, so as to ensure that the noise levels Protection continues to be within the noise standards set by Central Pollution (Amendment) Control Board (maximum 80 dB(A)). Rues, 2005. Operation of At construction camps within 150 m of human settlements, noisy Contractor CSC MoRTH construction camp, construction should be stopped between 10:00 pm and 6:00 am. Specification quarry, stone crusher 111.1 units, borrowing of In quarry and crusher units: Controlled blasting techniques should Contractor CSC MoRTH earth and functioning be adopted in quarries. Conduct quarrying in a skillful, scientific and Specification of labour camps systematic manner. 111.3 (Contd. from above) Follow a routine and preventive maintenance procedure for the DG set in consultation with the DG set manufacturer. The stack height of the DG set has to be adequate as per the guidelines of KPCB. Workers shall not be exposed to sound of more than 85 – 90 DB for Contractor CSC MoRTH more than eight hours a day and shall be provided with ear plugs. Specification 111.1 Mitigation Measures for Impacts on Biological Environment Wilbur Smith Associates Pvt. Ltd. 3.18 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation Saplings planted for green belt development should be properly taken Contractor CSC MoRTH care of and protected to ensure their survival and growth. Specification 111.1 If the camp is located near the forest or private plantations, orient Contractor CSC MoRTH the labourers to refrain from any activities involving poaching, Specification NTFP collection or spread of forest fire. 111.1 Mitigation Measures for Socio-Economic Impacts Provision of safe drinking water and access to sanitation services Contractor CSC MoRTH should be continued at satisfactory service levels. Specification 111.1 Construction workers should use the personal protective Contractor CSC MoRTH equipments provided to them and it shall be replaced if necessary. Specification Fire fighting equipments like fire extinguishers provided in the 111.1 camp should be maintained well. Fencing of the camp to prevent trespassing of humans and animals Contractor CSC MoRTH into the camp should be maintained properly. Specification 111.1 To the extent possible local people should be included in the labour Contractor CSC MoRTH force so that there are less incidence of crime. Specification Information dissemination should be undertaken to generate 111.1 awareness among migrant labourers about the sensitivities of the local region with respect to rules, laws, local customs and beliefs. Operation of Other provisions to ensure worker’s safety shall be followed as per Contractor CSC MoRTH construction camp, guidelines given in Annexure 3.9. Follow guidelines in Annexure Specification quarry, stone crusher 3.11 to ensure safety in storage and handling of hazardous substances. 111.6 and units, borrowing of Section VII earth and functioning General of labour camps Conditions of (Contd. from above) Contract - Sub Clause 4.8 Wilbur Smith Associates Pvt. Ltd. 3.19 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation and 6.7 On occurrence of any accident or injury, the safety officer should Contractor CSC MoRTH submit an accident report to the CSC in the format given in Specification Annexure 3.34. 111.1 Mitigation Measures for Impacts due to Solid Waste Generation Waste petroleum and lubricants should be collected and sold out to Contractor CSC MoRTH approved oil recycling agencies. Specification Other solid wastes should be collected and taken to approved 111.1 disposal sites, according to GOI laws. Periodical maintenance of waste handling space should be Contractor CSC MoRTH undertaken in construction camp and labour camp. Specification All types of solid waste should be collected and disposed of 111.10 frequently as per Comprehensive Waste Management Plan. Debris / solid waste should be disposed in debris disposal site approved by CSC. Guidelines for management of debris disposal given in Annexure 3.6 should be followed. B.2.2. Extraction of Surface Water should be drawn from only those sources that have got prior Contractor CSC MoRTH water approval of CSC. Specification Over extraction of surface water should be avoided. 111.1 B.2.3. a) Transportation of Mitigation Measures for Impacts on Land and Water materials Vehicles and machinery should be maintained and refilled in such a Contractor CSC MoRTH b) Scarifying of fashion that fuel spillage does not contaminate the soil and their Specification existing bituminous emission levels are as per norms of state PCB. 111.1 layer Fuel storage and refilling sites should be kept away from cross drainage structures and important water bodies. Existing project road and haul roads maintenance should be Contractor CSC MoRTH undertaken regularly to reduce the damage due to over use and for Specification - easy plying of construction vehicles as well as regular local 111.11 commuters. Wilbur Smith Associates Pvt. Ltd. 3.20 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation Washing of vehicles, construction equipments and machineries Contractor CSC MoRTH near/inside the water bodies should be avoided to prevent water Specification contamination. 111.4 Mitigation Measures for Impacts on Air and Noise All vehicles should have PUC certificates. Contractor CSC MoRTH Dust covers/ tarpaulins should be provided to cover construction Specification - material loaded on trucks. 111.8 Idling of delivery trucks or other equipment shall not be permitted Contractor CSC MoRTH during periods of unloading or when they are not active. Specification 111.1 Sprinkling of water should be carried out along the haul road at least Contractor CSC BOQ No. 11 twice a day on a regular basis during the entire construction period especially in the winter and summer seasons. Wherever the haul road is passing within 150 mts of human Contractor CSC MoRTH settlements, the transportation of material shall be stopped during Specification night time (between 10:00 pm and 6:00 am.). 111.1 At construction sites within 150 m of human settlements, noisy construction should be stopped between 10:00 pm and 6:00 am. Near sensitive receptors use temporary noise barriers and avoid work at night. Mitigation Measures for Socio-Economic Impacts The activity shall be undertaken in such a way that the inconvenience to public, especially the Sabarimala pilgrims, shall be bare minimum and without causing any accidents. The speed of the trucks carrying materials shall be regulated. Workers should be provided with personal protective equipments Contractor CSC MoRTH such as ear plugs, helmets, goggles, gloves etc. Specification 111.1 Wilbur Smith Associates Pvt. Ltd. 3.21 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation Other provisions to ensure worker’s safety should be followed as Contractor CSC MoRTH per guidelines given in Annexure 3.9. Specification - 111.6 Traffic Management Plan shall be prepared based on guidelines Contractor CSC MoRTH presented in Annexure 3.10 to reduce the disruption of traffic. Specification 111.1 Diversion roads should be paved, adequate traffic safety measures Contractor CSC MoRTH should be adopted. Specification 111.1 Mitigation Measures for Impacts due to Solid Waste Generation Scarified material shall not be disposed off anywhere in an Contractor CSC MoRTH unscientific and unsafe manner. Specification Scarified material should be reused for construction of internal roads 111.1 within camps and sites. B.2.4. Compacting earth Mitigation Measures for Impacts on Land and Water and laying of sub- Vehicles, machinery and equipments used in construction should be Contractor CSC MoRTH base course, base maintained and refilled in such a fashion that fuel spillage does not Specification course, construction contaminate the soil or water. 111.4 of bridges, culverts, Construction vehicles should operate within the Corridor of Impact ROB, other avoiding damage to soil and vegetation. structures etc. Fuel storage and refilling sites should be kept away from cross Contractor CSC MoRTH drainage structures and important water bodies. Specification 111.1 All construction operators, drivers and workshop personal should Contractor CSC MoRTH be trained well so that they can take immediate measures for the Specification spill of contaminates. 111.1 All spills and construction debris should be disposed off in the sites Wilbur Smith Associates Pvt. Ltd. 3.22 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation identified for the same as per guidelines and the site should be fully cleaned before handing over. Construction of foundation of bridges/ culverts during monsoon Contractor CSC MoRTH season should be avoided. Specification 111.1 Adopt necessary measures to prevent the wastewater produced during Contractor CSC MoRTH construction from entering directly into water bodies. Specification 111.1 Compacting earth Mitigation Measures for Impacts on Air and laying of sub- Road surface should be cleaned with air compressor and vacuum Contractor CSC MoRTH base course, base cleaners prior to the construction works. Manual labour using Specification course, construction brooms and blowing of air should be avoided. 111.1 of bridges, culverts, Sprinkling of water on site to aid compaction of the material and for Contractor CSC BOQ No. 11 ROB, other dust suppression. structures etc. The construction operations during nights, especially in the winter Contractor CSC MoRTH (Contd.) season shall be carried out under restricted conditions. Specification 111.1 Mitigation Measures for Impacts on noise Construction contract shall clearly specify the use of equipment Contractor CSC MoRTH emitting noise of not greater than 90 dB (A) for the eight hour Specification operation shift. 111.1 For protection of construction workers, earplugs shall be provided to Contractor CSC MoRTH those working very close to the noise generating machinery. Specification 111.1 At construction sites within 150 m of human settlements, noisy Contractor CSC MoRTH construction shall be stopped between 10:00 pm and 6:00 am Specification 111.1 Wilbur Smith Associates Pvt. Ltd. 3.23 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation Near sensitive receptors use temporary noise barriers and avoid Contractor CSC & PMT MoRTH work at night. Specification Public will be informed about the regulations on noise of vehicles. 111.1 Proper signboards should be erected near sensitive receptors. Compacting earth Mitigation Measures for Impacts on flora and fauna and laying of sub- Construction activity in and near water bodies should be restricted Contractor CSC & PMT MoRTH base course, base during breeding period of aquatic life. Specification course, construction 111.1 of bridges, culverts, Mitigation Measures for Socio-Economic Impact ROB, other Traffic Management Plan should be prepared based on guidelines Contractor BOQ No. 11 structures etc. CSC & PMT presented in Annexure 3.10. (Contd. ) The activity shall be undertaken in such a way that the Contractor CSC & PMT MoRTH inconvenience to public, especially the Sabarimala pilgrims, shall be Specification bare minimum and without causing any accidents. The speed of the 111.1 trucks carrying materials shall be regulated. Diversion roads to be paved, adequate traffic safety measures to be adopted. Extensive precautionary measures to be taken to reduce the Contractor CSC & PMT MoRTH inconvenience to the public/ pilgrims during the nine-month Specification pilgrimage period spread over three successive years. The same shall 111.1 be detailed in Traffic Management Plan and implemented. All Contractors’ staff should wear high visibility purpose made Contractor CSC & PMT MoRTH overalls or trousers/a waist coat at all times All operators working Specification with any materials above head height (even in trenches) should wear 111.1 hard hats all at times on the worksite. Other provisions to ensure worker’s safety should be followed as per Contractor CSC & PMT MoRTH guidelines given in Annexure 3.9. On occurrence of any accident or Specification injury, the safety officer should submit an accident report to the CSC 111.6 in the format given in Annexure 3.34. Wilbur Smith Associates Pvt. Ltd. 3.24 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation Mitigation Measures for Impacts due to Solid Waste Generation If the site is within 100 Km from thermal power plant permission Contractor CSC & PMT MoRTH under Fly Ash Notification, 2007, to be obtained from regional office Specification of MoEF for using fly ash in the construction process. 111.1 Debris shall be collected in a scientific manner and to be disposed off Contractor CSC & PMT MoRTH in the sites identified for the same as per guidelines given in Specification Annexure 3.5. 111.10 B.2.5 Debris disposal As far as possible, use the debris to interior unpaved road or the Contractor CSC & PMT MoRTH approach roads / haul roads to strengthen it. Specification It can also be used for filling of low lying play grounds etc. 111.10 Provide proper drainage facility so that the sites do not contaminate Contractor CSC & PMT MoRTH any water sources, rivers etc. Specification 111.1 B.2.6 Roadside plantation The compensatory avenue plantation shall be taken up at the onset Contractor CSC & PMT MoRTH and landscaping of monsoon season as per IRC: SP 21-2009 “Guidelines on Specification Landscaping and Tree Plantation� and in consultation with the State 111.1 Forest Department. Compensatory tree plantation at a rate of three per each tree removed. Debris to be disposed off in the sites identified for the same as per Contractor CSC & PMT MoRTH guidelines in Annexure 3.5. Specification 111.10 C. Post construction / Operational Phase C.1. Redevelopment of Mitigation Measures for Impacts on Land and Water construction and Should be undertaken depending on the type of redevelopment Contractor CSC / PMT MoRTH labour camp sites, envisaged in the redevelopment plan. Specification quarry and crusher 111.2 and sites, borrow areas. 111.3 Wilbur Smith Associates Pvt. Ltd. 3.25 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation All the temporary structures should be cleared as per redevelopment Contractor CSC / PMT MoRTH plan. Specification All building debris, garbage, night soils and POL waste should be 111.1, 111.2 disposed off safely and the site should be fully cleaned before and 111.3 handing over. All disposal pits or trenches should be filled, disinfected and effectively sealed off. Plantation along the boundary, erosion control measures, leveling or Contractor CSC / PMT MoRTH slope stabilization measures should be undertaken based on the Specification activities envisaged in redevelopment plans approved by the CSC. 111.3 and 111.2 All measures envisaged in redevelopment plans approved by the CSC Contractor CSC / PMT MoRTH shall be undertaken. Specification 111.1 Mitigation Measures for Impacts on water Based on the quarry redevelopment plan approved by the CSC Contractor CSC / PMT MoRTH necessary development activity like water recharging or developing it Specification into a fishing pond shall be undertaken. 111.3 Depending upon the type and form of rehabilitation to be adopted Contractor CSC / PMT MoRTH slope stabilization measures and small bund creations may be Specification undertaken in borrow areas. 111.2 Mitigation Measures for Impacts on Biological Environment Plantations along the boundary shall be undertaken. Contractor CSC / PMT MoRTH Surplus trees after avenue plantation will be utilized for green belt Specification development of exhausted borrow areas. 111.1 Mitigation Measures for Socio-economic Impacts Involve local community in the implementation of redevelopment Contractor CSC / PMT MoRTH plan of quarry sites and borrow areas. Specification 111.3 Wilbur Smith Associates Pvt. Ltd. 3.26 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation C.2. Operationalisation of Regular maintenance of plantations especially during summer season Contractor PMT MoRTH the project stretch until defect liability period gets over. Specification 111.1 Necessary signboards should be put up to inform the public about Contractor PMT MoRTH the restrictions on horn at sensitive locations like schools and Specification hospitals along the road. 111.1 Table 3.3. Part-I Link Specific Environmental Management Action Plan for PMT, CSC and Others Sl. Activity Management and Mitigation Measures Implementing Monitoring Reference No. Organisation Organisation A. Design / Project Preparation Phase A.1. Preparation of DPR Cultural properties along the alignment were identified. Religious Design PMT EMAP structures were avoided by adjustment of alignment. (Refer Consultant Annexure 3.55). Issues raised in public consultations were examined and suitably Design PMT EMAP incorporated based on merit. These include parking areas and other Consultant road safety measures. Road safety issue due to acute curves have been addressed by road Design PMT EMAP realignment as given in Table 2.2. of EMP Report and Table 5.0 in Consultant Annexure 3.50 and according to Annexure 3.41. Loss of existing bus stops and waiting shed facilities were addressed Design PMT EMAP by suitably relocating or integrating them to the design (Refer Consultant Annexure 3.43). Bus lay bys and bus waiting shed designs are provided in Annexure 3.53. Accident black spots were addressed by improving the road surface, Design PMT EMAP road geometry, pedestrian facilities and bus bays. (Refer Annexure - Consultant 3.43). Signages were given a high priority for all road junctions. B. Pre-Construction Phase Wilbur Smith Associates Pvt. Ltd. 3.27 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. Activity Management and Mitigation Measures Implementing Monitoring Reference No. Organisation Organisation B.1 Clearing the site All the cultural properties and common property resources being PMT - NA impacted due to the project should be relocated with prior approval of the concerned community / departments/ agencies before starting the construction. (Refer Annexure 3.55). B.2. Clearing of Avenue Chainage wise number of trees to be felled for the corridor is shown PMT - BOQ No. 2 Trees in Annexure 3.49. Small trees shall be suitably transplanted to nearby puramboke land Table 3.4. Part-II Link Specific Environmental Management Action Plan for Contractor Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation A. Construction Phase A.1. Site Preparation Activities A.1.1. Material sources Mitigation Measures for Impact on Land and Water Sourcing of materials from approved sources as per Annexure 3.47 and Contractor IE EMAP 3.48. A.2. Construction Activities A.2.1. All types of Mitigation Measures for Impacts on Land and Water construction Retaining walls with cross drainage structures to be constructed at Contractor IE BOQ No. 3 activities including locations given in Annexure 3.41, where there are filling of low lying ED. No. TD- compacting earth, areas and construction of embankments. 2D-80-003-01 laying of sub-base course, base The foundation area should be separated from other areas with an Contractor IE EMAP course, impervious barrier. This barrier will act as a settling tank for the solids construction of and will prevent substantial increase in the turbidity of surrounding bridges, culverts, water. The sludge should be removed periodically and disposed off in ROB, other the selected construction debris disposal sites. Wilbur Smith Associates Pvt. Ltd. 3.28 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation structures etc. This has to be taken care of at locations given in Annexure 3.46, where there are water bodies and at locations given in Annexure 3.42, where there are filling of low lying areas and construction of embankments. At locations where the proposed road crosses water body enhancement Contractor IE BOQ No. 11 measures should be undertaken. (refer Annexure 3.46). To reduce flooding and water logging, the cross drainage structures Contractor IE BOQ No. 3 should be provided at locations given in Annexure 3.41 and Annexure ED. No. TD- 3.45. 2D-10-001-01 to 04, TD-2D- 12-001-01 to 05, TD-2D-80- 005-01 and TD-2D-80- 006-01. Water quality monitoring shall be conducted along project stretch as per Contractor IE BOQ No. 11 Environmental Monitoring Plan so that appropriate measures are taken up towards abatement of pollution. Mitigation Measures for Impacts on Air Air quality monitoring shall be conducted along project stretch as per Contractor IE BOQ No. 11 Environmental Monitoring Plan so that appropriate measures are taken up towards abatement of pollution. All types of Air quality monitoring shall be conducted at the site of project facilities Contractor IE BOQ No. 11 construction as per Environmental Monitoring Plan so that appropriate measures are activities including taken up towards abatement of pollution. compacting earth, laying of sub-base Mitigation Measures for Impacts on Noise course, base Near sensitive receptors as listed in Annexure 3.44 use temporary noise Contractor IE EMAP Wilbur Smith Associates Pvt. Ltd. 3.29 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Activity Management and Mitigation Measures Implementing Monitoring Reference Organisation Organisation course, barriers and avoid work at night. construction of Construction of noise barriers (stone walls and planting) for silence Contractor IE BOQ No. 11 bridges, culverts, zones including schools and hospital. [Refer Annexure 3.44]. Design for Engg. Drg No. ROB, other noise barrier provided in Annexure 3.53. EM-1D-60- structures etc. 008 (Contd.) Noise quality monitoring shall be conducted at the site of project Contractor IE EMAP facilities as per Environmental Monitoring Plan so that appropriate measures are taken up towards abatement of pollution. Mitigation Measures for Impacts on Biological Environment Compensatory tree planting at the rate of three per each tree removed. Contractor PMT BOQ No. 11 (refer .Annexure 3.49 for details of tree removal). List of indigenous tree and shrub species is shown in Table 3.0 and 4.0 in Annexure 3.50. The project tree planting strategy is provided in Annexure 3.50. Tree planting in oxbow land without access control at location given in Contractor PMT BOQ No. 11 Table 5.0 in Annexure 3.50 (refer Annexure 3.53). Engg. Drg No. EM-1D-60- 002. Mitigation Measures for Socio-Economic Impact Bus shelters and bus laybyes should be constructed at locations Contractor PMT BOQ No. 11 identified in Annexure 3.43 and Annexure 3.53. Engg. Drg No. EM-1D-60- 009 & 007 Information boards showing name of rivers, pilgrim sites, tourist Contractor PMT BOQ No. 11 locations as per the environmental enhancements (Refer Annexure Annexure 3.55). Wilbur Smith Associates Pvt. Ltd. 3.30 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Chapter 4. Arrangements for the Implementation of EMAP The Environmental Management Action Plan (EMAP) (Provided as Table 3.1 to Table 3.4), which is an integral part of the Environmental Management Plan, identify the detailed impacts, propose the mitigation actions, mention the implementing organization and monitoring organization. The responsibility for the implementation of EMP involves a number of parties, each with specific responsibilities. They are listed as follows:  Project Management Team (PMT), that represents GoK and is directly responsible for implementing the project  Consultant Supervision Consultant (CSC) , who will be in charge of supervising the Contractor  Construction Contractor, who is in charge of undertaking road construction work. This chapter looks into the organisation and staffing of each of these stakeholders along with their responsibilities. 4.1. Organisation, Staffing and Responsibilities of PMT Project Management Team (PMT) for the project under scrutiny is KSTP, which is a part of the Public Works Department (PWD) in general, as the project proponents, are responsible for the implementation of all road improvement works and environmental management activities. The KSTP is executing the project work under the guidance of Project Director (PD) as its head. The Project Director is assisted on all technical issues by one Chief Engineer (Projects), one Superintendent Engineer, one Executive Engineer (Environment) and sociologist and Assistant Executive Engineer and Assistant Engineers. The PMT is having five field divisions comprising of one Executive Engineer (R&R Officer), 2 Assistant Executive Engineers and 9 Assistant Engineers and other supporting staff which will play a key role in implementation of EMP and R&R. The team will oversee the project related management activities of the project including the overall control of construction activities and implementation of contracts. The implementation of mitigating measures requires supervision from adequately trained staff within the PWD. The institutional organisation for EMP implementation is shown in Figure 4.1 and Figure 4.2 shows a very flexible and practical Environmental Management Unit (EMU). The detailed structure of KSTP is separately captured in Figure 4.3. Responsibilities of Chief Engineer in PWD: S/he is responsible for acquisition of all necessary right-of-way (ROW) land and buildings, review and approval of detailed road designs, obtaining all necessary clearances for construction and related activities, review and approval of the road realignments and road works (including retaining walls and excavation sites) and liasoning with supervision consultants. Responsibilities of Chief Engineer: The Environmental Engineer (EE) of KSTP Project Management Team (PMT) assists the Chief Engineer in the overseeing of environmental aspects of the construction contracts, including the enforcement of all monitoring provisions, and advice on the locations of construction and labour camps, etc. He is also familiar with the Indian environmental legislation, environmental monitoring, EMP implementation aspects etc. The Environmental engineer shall oversee day to day implementation of the environmental management plans pertaining to the construction contract for various road links and is also Wilbur Smith Associates Pvt. Ltd. 4.1 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road responsible for monitoring reports to World Bank. Additional recruitment if needed will be undertaken as necessary on contract basis. Figure 4.1. Institutional Organisation for KSTP EMP Implementation Figure 4.2. Environmental Management Unit (EMU) Wilbur Smith Associates Pvt. Ltd. 4.2 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Figure 4.3. Organisation Structure, KSTP The main duties of the Environmental Engineer will include:  Collection and dissemination of relevant environmental documents including amendments to environmental protection acts issued by the Government and various agencies such as the World Bank, Asian Development Bank (ADB) and other organisations.  Co-ordination with non-government organisations (NGOs), community groups, government departments, etc. on environmental issues and obtaining the necessary clearances from the regulatory authorities.  Monitoring the environmental aspects of the project during construction to ensure that the environmental requirements of the contract and the mitigation measures proposed in the EMP are implemented.  Advising the Engineer and preparing the environmental input for the monthly progress report.  Development of guidelines or a code of good practice on low-cost environmental measures that can be implemented in the road construction and maintenance programs for the Public Works Department.  Development of environmental training activities for Contractors and Consultant Supervision Consultant staff.  Assistance to local governments in the restoration of the environmentally degraded portions of any existing Right-of-Way, which may revert to their control due to the construction of realignments.  Promotion of the policies adopted for the development of roadside amenities Wilbur Smith Associates Pvt. Ltd. 4.3 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road  Assistance with the road safety components and issues related to the effects of roadside environment on road safety and non-motorised traffic.  Laison with the EO of CSC and report to Superintending Engineer on all matters related to implementation of the Environmental Management Plan.  Issuing completion certificate for constructed road works for payment. 4.2. Organisation, Staffing and Responsibilities of Consultant Supervision Consultant (CSC) The Consultant Supervision Consultant will supervise the activities of the construction Contractor on behalf of Kerala State Public Works Department and will be reporting directly to the Superintending Engineer. The Consultant Supervision Consultant will be responsible for the technical supervision of road layout, overseeing contract implementation and certifying works for payment. The roles of Consultant Supervision Consultant is described below:  Supervision of the Contractor to ensure that work is undertaken according to the construction contract.  Inspection and reporting of Contractor activities to ensure effective implementation of the EMP.  Auditing of Contractor works and activities against the conditions put forward in the EMP.  Issuing corrective action, requests and conduct follow up inspections and evaluation.  Reporting any exceptions to the Project Director.  Certifying completed constructed road works for payment. The Consultant Supervision Consultant will have all the required specialists including an Environmental officer (EO) and a Senior Construction Safety Specialist. The brief description of qualifications, duties and responsibilities of the Team Leader, Senior Construction Safety Specialist and Environmental Officer of the Consultant Supervision Consultant (CSC) are as follows: Qualifications, roles and responsibilities of Team Leader: He shall be at least a graduate in Civil Engineering, with atleast at least 20 years of professional experience out of which he should have worked as Team Leader/Project Manager or equivalent for minimum 4 years on supervision/construction of highway projects, preferably involving flexible pavements. Post Graduate qualification in civil engineering is desirable. His roles and responsibilities shall be as follows:  He will be overall in-charge of the project supervision team.  He shall be responsible for the overall implementation activities.  He shall be assisted by key Professionals and other support Staff.  He shall coordinate with the subordinate team to ensure that the construction process is well controlled as per established Procedures.  He will interact with the client. Qualifications, roles and responsibilities of Senior Construction Safety Specialist (SCSS): The candidate shall be at least a Graduate in civil engineering and preferably with post graduate qualification in Industrial and Construction safety. OSHAS certification will be mandatory. S/he needs a minimum of 10 years of relevant professional experience, out of which, s/he should have worked for at least 5 years at a road / bridge construction site in the capacity of a safety Wilbur Smith Associates Pvt. Ltd. 4.4 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road engineer. Experience in working on height / deep foundations and live traffic situation and imparting safety training to construction managers and workers will be highly desirable.  The SCSS will report to the Team leader of the Construction Supervision Team.  S/he will be responsible for reviewing and approving the construction zone safety plans and traffic management including all temporary works/staging along with the structural or bridge engineer to confirm the safety point of view.  The Safety Specialist will be reponsible to guide the field supervision team and Contractors site officers and should confirm whether safety measurements implemented in the field are complying with safety standards.  The safety specialist must report any job accident or safety violation to the concerned officials through team leader. When an employee is injured on the job, the construction safety officer will investigate the accident and handle any workers' compensation claims.  The safety specialist shall teach proper safety and health procedures to the entire construction workers. Also, he should take intiatives to conduct training programmes and moke safety drills which will help to update safety procedures as well as the importance of reporting a safety concern or injury. Qualifications, roles and responsibilities of Environment Officer (EO) of IE: The candidate shall be M. Sc. Environmental Science or graduate in Civil / Environmental Engineering. The candidate shall have professional experience of at least 5 years relevant to environmental management in infrastructure projects. Experience in implementation of EMP in externally aided/FIDIC based major highway projects is preferable. He should have adequate experience in implementing EMPs and organizing training to Contractor’s and Employer’s staff. He should be familiar with requisite procedures involved in obtaining and implementing environmental clearance requirements for project roads.  The Environmental Officer (EO) will report to the Team leader of the Consultant Supervision Consultant Team. The EO shall not instruct or direct the Contractor or Contractor’s men but can discuss various issues and environmental mitigation measures with all concerned directly or indirectly.  All matters related to environmental and social activities within the ROW such as latest EIA, SEA, RAP and other related documents should be available to the EO immediately after mobilisation. The CRZ, Forest, environmental clearance, Kerala State Pollution Controll Board’s clearance conditions and other approval status should be specified. A status report prepared by PCC/ESMC of PMT would be required for the EO to start the work.  The Environmental Officer (EO) should be mobilised during the early stages of construction. This is to help the Contractor in identifying environmentally sound locations for Construction camps, hot mix plant, WMM plant and all other issues according to the Environmental Management Action Plan (EMAP).  The important role of EO during construction is to ensure the smooth implementation of EMAP and to address direct and indirect social issues arising out of implementation of the RAP.  The EO should visit incomplete construction work sites where there are no Contractor’s current activities, active construction work sites and completed areas of the work sites and conduct regular meetings with the Contractor in identifying gaps pertaining to both environment and contruction safety. The EO will also visit the hot mix plant; quarries and crushers, borrow areas and others as per the necessity. EO has to ensure appropriate corrective and preventive action to the identified gaps in Wilbur Smith Associates Pvt. Ltd. 4.5 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road construction site in environmental aspects. Conduct regular meeting on environmental aspects with Environmental and Social Management Unit in PWD.  The EO will assist the Engineer to ensure environmentally sound engineering practices. In addition, other specialists of the engineers team may also act and report on road safety related issues.  The EO will carry out consultation with the Contractor, Contractors men, local Project Affected People (PAPs) and interest groups. The EO will also consult with NGOs to consider any problems (e.g. access problem to school, buildings, houses and business establishments) arising from construction activities.  The EO will assist in the compliance with various labour laws including the payment of minimum wages to the individual contract labourer’s especially ‘unskilled illiterate migrant labourers’. This has a direct bearing on the health and safety of the workers.  The EO will assist the Contractor, and the Public Works Department in all matters related to public contacts including consultation, training and public relations.  The EO will prepare standard formats (if available they may be obtained from other projects that are being implemented or are completed recently) for the compliance of the environmental and social requirements.  The EO will ensure the procurement of materials that are included in the Bill of Quantities relating to environmental and social mitigation costs.  The EO will assist the PWD and the Contractor in all training activities during construction supervision period.  The EO will prepare and submit a regular reports to the team leader of CSC.  The EO will assist the various Environmental monitoring activities of the Contractor / PWD.  The EO will be responsible to confirm whether the Contractor has received all certififications in different sectors from the concerned authority to proceed the work.  The EO in cooperation with the EO of PMT and Superintending Engineer will make sure the issuing of timely Work order for the Nurseries to be raised according to the ‘Landscaping, Tree planting and Environmental Enhancement Plan’. This will allow one year for the plants to attains the required size. 4.3. Organisation, Staffing and Responsibilities of Construction Contractor The construction Contractor shall be responsible for undertaking all duties and works assigned in the road construction contract, including all specified conditions in the EMAP. The construction Contractor should prepare an implementation plan of mitigating actions specified in the EMAP Table. The Contractor will work closely with the Consultant Supervision Consultant to ensure that works are constructed to standard. Throughout this EMP, the construction Contractor is referred to as the ‘Contractor’ and the supervising Consultant is referred to as the ‘Consultant Supervision Consultant’ (CSC) . Detailed staffing pattern in the Contractor’s office is given below in Table 4.1. Table 4.1. Staffing Pattern in Contractor’s Office Sl. No. Designation Nos. 1 Contract Manager 1 2 Construction Planning Engineer 1 3 Site Engineer 4 4 Quality Control/Material Engineer 1 5 Bridge Engineer 1 Wilbur Smith Associates Pvt. Ltd. 4.6 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Sl. No. Designation Nos. 6 Earth Works Supervisor 6 7 Pavement Supervisor 2 8 Environmental Engineer 1 Roles and Responsibilities of Team Leader of Contractor: The Team Leader of the Contractor shall be responsible for the timely implementation of EMP, as per the conditions stipulated in the Environmental Management Action Plan. S/he shall prepare an implementation plan of mitigating actions specified in the EMAP Table. H/she shall guide / supervise the ESE in ensuring that all construction work is undertaken in line with the requirements of EMP. The team leader shall ensure that the reporting procedures mentioned in EMAP and detailed out in Chapter 5 of this report is adhered to and required reports and management plans are submitted to CSC on time. The corrective actions, as suggested by CSC shall also be implemented and reported. S/he shall have good understanding of the contractual clauses, especially the penalty clause given in sub clause 14.6 of the bid document as well as Chapter-3 of this report. He also has to ensure that the responsibilities stipulated in EMAP for Defect Liability period are carried out3. Qualifications, Roles and Responsibilities of Environment and Safety Engineer (ESE) of Contractor: The candidate shall be M. Sc. Environmental Science or B.Tech. in Civil / Environmental Engineering with two years field experience in environmental management of transportation projects. The duties and responsibilities of the Environment and Safety Engineer in the Contractor’s team4 are as follows: 1. To ensure that all the Contractor activities are done in line with the EMP requirements. 2. To have good understanding of the contractual clauses, especially the penalty clause given in sub clause 14.6 of the bid document as well as Chapter-3 of this report. 3. To verify the appropriateness of all the EMP items. 4. To prepare a management and redevelopment plan for all the sites of identified project related ancillary facilities like (i) Construction camp, (ii) labour camp, (iii) quarry and stone crusher unit, (iv) borrow area and (v) debris disposal site in line with detailed guidelines given in EMP. 5. To ensure that all the five sites and camps mentioned activity is operated, managed and closed in line with management and redevelopment plan. 6. To ensure that the top soil preservation is done wherever required as per the guidelines. 7. To ensure the adoption of proper waste management practices in the plant sites, labour camps, construction camps and along the road (also pertains to the proper disposal of bituminous / concrete waste generated during construction). 8. To ensure that the Contractor does not violate any social norms such as employment of child labour, children at work sites, providing creches, unhygienic working conditions and minimum wage considerations as per prevailing laws 9. To ensure that all the MORTH specifications are available and followed in all the Contractor activities. 10. To liaison with the Supervision Consultant and the PMT / PWD on matters pertaining to the EMP. 3 No full time engineer is required for this, any one in the Contractor’s team shall be given this responsibility. 4 The Contractor will need a dedicated civil engineer to address EMF and safety-related issues for each contract package. This engineer will be given appropriate logistical support to carry out the various activities Wilbur Smith Associates Pvt. Ltd. 4.7 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road 11. To liaison with Government Agencies such as the Pollution Control Boards and Forest Department in order to obtain the required clearances, and to ensure that the Contractor activities are carried out in line with any conditions placed. 12. To ensure adoption of good construction-related safety practices and appropriate traffic management practices to ensure road safety during the construction phase. 13. To prepare and implement a plan for road safety, accidents and traffic management. 14. To demark the starting chainage & end chainage of the project as the construction zone, and provide sign boards as per accepted standards. 15. To inform and train all the Contractor personnel on the IRC requirements on construction safety and on road safety. 16. To ensure the availability of first aid facilities. ISO requirements of Contractor: All construction sites of the Contractor shall comply with Environmental Management System - ISO 14001 requirements within one year from the award of the contract based on the Environmental Health & Safety Management System and obtain ISO 14001 certificate. The Contractor shall have a documented quality management system (QMS) for all construction sites within one year from the award of the contract based on the requirements of ISO 9001: 2008 and obtain the certificate. The Contractor shall also establish and maintain an Occupational Health and Safety Management system complying with ISO 18001 and obtain the certificate for all construction sites within one year from the award of the contract. Reporting requirements of Contractor: The Contractor shall undertake regular reporting to CSC, comprising submission of reports as well as management and redevelopment plans to CSC as detailed in the Chapter -5 of this EMP. 4.4. Information Dissemination Information dissemination shall be undertaken by PMT at a macro level and by the Contractor in the project site at micro level. The wider dissemination of information to public shall be undertaken by PMT through the disclosure of EIA / EMP reports in the website of PMT. At the project site, i.e. the direct impact zone, information boards shall be displayed at critical and pre-identified locations to disseminate the project details. Such information boards shall display project name, Contractor’s name, concerned official’s name in Contractor’s office with his designation and contact no., name and contact details of an authorised official in local PWD divisional office. These information boards shall be approximately of size 5’ x 5’ and shall be designed and put up in such a way that public can easily read it from a distance. Such boards shall be setup, not only along active project stretches, but also at the sites of construction camps and labour camps and other project facilities like borrow area, quarry and stone crusher site and debris disposal site. These information boards shall also mention the availability of a complaint register with ESE of the Contractor. Under the RTI Act, 2005, Contractor is also duty bound to share any information demanded by the public, pertaining to any aspect of the project, as and when it is demanded. 4.5. Grievance Redressal Mechanism Public Complaint Cell in PWD: In order to create a responsive and transparent information landscape for the PWD, a Public Information Cell has been set up vide G.O. No. 26170/D3/2009/PWD dated 21-11-2009 to serve as a point of contact to provide information to the public and the media about the goals, policies and activities of the PWD. The PI Cell operating from within the PWD is serving as an active link for gathering and disseminating Wilbur Smith Associates Pvt. Ltd. 4.8 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road information about the PWD. Events such as workshops, seminars, campaigns and training programs are also part of a wider agenda of the PI Cell. Under Public Information Cell, a helpline desk was established with a toll-free Phone Number 18004257771, with 2 operators for attending calls during all working days and dedicated software to register complaints online with various monitoring and evaluation features. This software is integrated with the PWD website. This was part of institutional strengthening process of PWD funded by World Bank and is being operated by Public Information Cell situated at KSTP. Around 250 mobile phones with connections was distributed for all AEEs of different wings to speed up the process of Grievance redressal the Asst. Executive Engineers are contacted by the helpline desk operator over phone and informed about the complaint received. Such complaints are forwarded by the operator to the mobile phone of concerned Asst. Executive Engineers based on the seriousness of the complaint, the concerned officer will immediately contact the complainant and discuss about the issue and take follow up actions. The Asst. Executive Engineer is liable to contact the complainant within 48 hours. Once the complaint is made, a registration number is issued to the complainant. A weekly report is also sent from all concerned officers with details of the complaints received and action taken to the PI cell. Apart from this, a media desk was set up with senior journalists for reviewing all major newspapers. Complaints register with Contractor: The Contractor shall keep and maintain a complaint register report at his site office along the project road as well as project facilities like construction camp, labour camp etc., for public to register their complaints. The format for same is given in Annexure 3.18 in the EMAP table. The Contractor, after taking necessary action based on the complaint, shall also incorporate the same in the complaint register. This report shall also be part of the monthly report, for CSC to monitor and take necessary action, if needed. It has to be noted that, inaction upon the complaint of the public shall be considered as a major lapse from the side of the Contractor, leading to invoking of penalty clause, which is given in Chapter 3 of this report as well as the Contract document. 4.6. Training Programme on Environmental Aspects Training is an investment made on the human resource of the organization to provide and tone the competencies, required to do an existing job well and also to perform for future needs. Targeted and monitored training can set up an environment of good morale and productivity and contributes in creating a powerhouse of competencies for the organisation. This section deals with the training to be imparted to the Contractor’s staff by the EO and SCSS of CSC for ensuring effective implementation of EMP. The training requirement could be broadly identified as given in Table 4.2 below. Table 4.2. Training Programme to the Contractor’s Staff Programme Particulars Duration Participants Contractor’s Responsibility as per bid Orientation One day document Engineers including ESE Programme each Reporting System in EMAP Skilled and unskilled labourers Awareness General Awareness on Environment One day Engineers, supervisors and programme General Awareness on Safety aspects each office staff The need for additional and specialised training shall be examined and appropriate training will be undertaken as required. Wilbur Smith Associates Pvt. Ltd. 4.9 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Chapter 5. Environmental Monitoring & Reporting Requirements 5.1. Monitoring and Reporting of Environmental Management Measures A robust monitoring and reporting system is mandatory to ensure compliance to EMAP by the Contractor. The monitoring and reporting system evolved for KSTP-II is shown in Table 5.1 and is integrated into EMAP table and its annexures. It comprises following three parts: (A) Monitoring and reporting of environmental management measures for project related facilities like construction camp, labour camp, quarry area, borrow area and debris disposal site, (B) Monitoring and reporting of environmental management measures for overall project, and (C) Monitoring and reporting of quality of environmental parameters like air, water and noise. This monitoring and reporting system attempts to pre-empt much of the environmental issues created during construction and post construction stages and provides the necessary feedback for CSC / PMT to make sure that EMAP is implemented in full spirit. Instead of a linear reporting system, this system works on a two way basis – initial reporting by Contractor followed by monitoring by CSC based on Contractor’s reports. Responsibilities for monitoring will rest with the Environmental Officer of the Supervising Consultant reporting to the PMT and EMU at KSTP. The detailed procedure of reporting and monitoring system is as follows: (A) Monitoring and Reporting of Environmental Management Measures for Project Related Facilities Sage I – Site Identification: While initiating the project, the Contractor needs to identify suitable sites for project related ancillary facilities like construction camp, labour camp, quarry and stone crusher units, borrow area, debris disposal sites and sources of water for construction. The same shall be undertaken adhering to the criteria given in the respective guidelines for each of these sites given in Annexures 3.1 to 3.5. Once the site is identified by the Contractor, s/he shall prepare a site identification report furnishing all the details pertaining to the identified site using the reporting format given in Annexures 3.12 to 3.17 and submit it to the CSC. Subsequently, the EO of CSC has to visit each site and approve / reject the site with reasons. The EO of CSC has to give a copy of this format to the Contractor after his approval / rejection with remarks. This reporting procedure needs to be undertaken for each and every parcel of land identified for any of the project related ancillary facility. Stage II – Setting up of Sites: On approval of a site, the Contractor has to prepare the Management and Redevelopment Plan for this site as per the relevant Guidelines given in Annexures 3.1 to 3.5 of EMP and submit to CSC for approval. In addition to the Management and Redevelopment Plans for sites, the Contractor has to prepare Comprehensive Waste Management Plan, Occupational Health and Safety Management Plan, Traffic Management Plan and Hazardous Substances Management Plan for all sites together, as per the Guidelines given in EMP Annexure 3.6, 3.9, 3.10 and 3.11 respectively. Subsequently, the EO of CSC needs to visit each site and approve the Management Plan. The EO of CSC has to give a copy of this management plan to the Contractor after his approval with remarks / suggestions for additional mitigation measures. Any kind of activity could be initiated in a site only after getting approval Wilbur Smith Associates Pvt. Ltd. 5.1 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road from CSC for the Management and Redevelopment Plan for that site. These plans need to be prepared for each and every parcel of land identified as described above. Stage III –Operation of Sites: Once the Contractor receives approval for the Management and Redevelopment Plan, s/he can initiate activities on the site. All the activities shall be undertaken strictly in line with the said plan. CSC shall monitor the implementation of management plan monthly once, through site visits and the Checklists for Monitoring the Environmental Management of Sites / Camps given in Annexures 3.20 to 3.24. Corrective actions with specific timeframe should be proposed for each environmental management measure, which is not implemented satisfactorily. A copy of the filled up checklist should be given to the ESE of the Contractor. CSC has to attach this format to the monthly Report to be submitted to PMT, with details of corrective action taken by the Contractor. A Register of Sites Opened and Closed in the format given in Annexure 3.19 should be maintained by the Contractor (preferably in A3 size paper) for each road. Details of each site opened should be entered in this register in chronological order. When ever a site is closed, it should be recorded in this register with status of redevelopment. Clearances applicable for each site and the status of clearances should also be entered in this register. This same format shall be used to report the details of sites opened and closed to the CSC along with the Monthly Report of the Contractor. EO of CSC has to visit the sites, verify the details and approve the report with instruction to the Contractor if any clearance is pending for any site or redevelopment is not done satisfactorily for any closed site. .A copy of the approved report with IE’s remarks should be given to the ESE of the Contractor. The EO of CSC has to attach this format to the monthly Report to be submitted to PMT, with details of corrective action taken by the Contractor. Stage IV – Closure of Sites: Upon completion of the operation in any particular project ancillary facility site, the Contractor shall undertake redevelopment of the same, in line with the redevelopment plan which was already approved by CSC and intimate to CSC through the format for Register of Sites Opened and Closed. The Environmental Officer of the CSC shall monitor the same through site visit and the Checklists for Monitoring the Redevelopment of Sites / Camps provided in Annexures 3.25 to 3.29 as and when a site is closed and reported by the Contractor. Corrective actions with specific timeframe should be proposed for each environmental management measure, which is not implemented satisfactorily. A copy of the filled up checklist should be given to the ESE of the Contractor. CSC has to attach this format to the Monthly Report to be submitted to PMT, with details of corrective action taken by the Contractor. As described above, the reporting tasks for project facilities have been split and shared among Contractor and CSC and its summary is given below:  One time reporting by Contractor to CSC at the stage of identification of sites and camps  One time reporting by Contractor to CSC through management and redevelopment plans before setting up of sites and camps.  Monthly reporting of sites opened and closed by Contractor to CSC  Monthly monitoring by CSC during the operation stage of sites and camps  One time monitoring by CSC after the closure of each site and camp Wilbur Smith Associates Pvt. Ltd. 5.2 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road (B) Monitoring and Reporting of Environmental Management Measures for Overall Project The Contractor shall undertake regular monthly reporting to CSC using the format given in Annexure 3.38, and all other reporting formats shall be attached to this monthly report as annexures. The Monthly Report captures the physical progress of the work, main issues / concerns, corrective actions taken, no. of workers in the reporting month etc. Further, CSC shall report monthly to PMT, summarising the issues / concerns and actions taken. This report has to be prepared in the format given in Annexure 3.39 and all other reports are to be attached to it as annexures. All the reporting formats given in Annexures 3.30 to 3.39 shall be used by the Contractor to report environmental management measures related to various aspects of the overall project. These reports are to be submitted monthly by the Contractor to the CSC. The EO of CSC shall visit the sites and verify the implementation of management measures and approve the reports. EO of CSC should give a copy of the approved reports to the ESE of the Contractor with his remarks. (C) Monitoring and Reporting of Environmental Quality Environmental quality monitoring shall be undertaken by the Contractor through an NABL approved Laboratory, based on the Environmental Quality Monitoring Plan presented in Table 5.2. The monitoring results shall be reported by the Contractor to the CSC in the Reporting Format for Environmental Quality Monitoring given in Annexure 3.35 along with the Monthly Report, if monitoring was due in that month. A copy of the monitoring report given by the Laboratory has to be attached to this format. The CSC has to visit the sites and verify the details. Additional mitigation measures, if required, can be suggested by the CSC. The EO of CSC has to give back a copy of this format to the Contractor after his approval with remarks. Wilbur Smith Associates Pvt. Ltd. 5.3 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Table 5.1. Monitoring and Reporting Plan for Entire Project reporting / Monitoring format Applicable Project Frequency of reporting Frequency of reporting / Applicable annexure Site by Contractor Action to be taken by IE no. A. For project related facilities and sites Stage-I. Site identification Construction camp Annexure No. 3.12 Labour camp Annexure No. 3.13 Quarry and stone One time reporting to Annexure No. 3.14 Reporting Formats for Identification of Visit each site and approve the crusher unit CSC for each site, as and Sites site as and when it is reported Borrow area when it is identified. Annexure No. 3.15 Debris disposal site Annexure No. 3.16 Water Sources Annexure No. 3.17 Stage-II. Setting up of sites Construction camp Annexure No.3.1 Labour camp Annexure No.3.2 One time reporting to Visit each site and approve the Management and Re-development Plans Quarry and stone Annexure No.3.3 CSC for each site, and management plans as and when for Sites / Camps crusher unit when it is required. it is submitted Borrow area Annexure No.3.4 Debris disposal site Annexure No.3.5 Comprehensive Waste Management Plan All Sites One time reporting to Visit each site and approve the Annexure No.3.6 CSC for all sites together management plan as and when it is submitted Occupational Health and Safety All Sites One time reporting to Visit each site and approve the Annexure No.3.9 Management Plan CSC for all sites together management plan as and when it is submitted Traffic Management Plan All Sites One time reporting to Visit each site and approve the Annexure No.3.10 CSC for all sites together management plan as and when it is submitted Hazardous Substances Management Plan All Sites One time reporting to Visit each site and approve the Annexure No.3.11 CSC for all sites together management plan as and when it is submitted Wilbur Smith Associates Pvt. Ltd. 5.4 Kerala State Trasport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road reporting / Monitoring format Applicable Project Frequency of reporting Frequency of reporting / Applicable annexure Site by Contractor Action to be taken by IE no. Stage-III. Operation of sites Format for Register of sites opened and All sites / camps Details to be recorded in Check the status of clearances Annexure No. 3.19 closed and its reporting chronological order as and redevelopment status of each and when a site is opened site and approve the report / closed. To be submitted monthly. to CSC monthly. Construction camp Annexure No. 3.20 Labour camp Annexure No. 3.21 Checklists for Monitoring Monitor the implementation of Quarry and stone Annexure No. 3.22 Environmental Management of Sites / Nil management plan monthly once, crusher unit Camps through site visits and checklists. Borrow area Annexure No. 3.23 Debris disposal site Annexure No. 3.24 Stage-IV. Closure of sites Construction camp Annexure No. 3.25 Monitor the implementation of Labour camp Annexure No. 3.26 redevelopment plan through site Checklists for Monitoring Quarry and stone Annexure No. 3.27 Nil visits and checklists as and when Redevelopment of Sites / Camps crusher unit a site is closed and reported Borrow area through the register of sites. Annexure No. 3.28 Debris disposal site Annexure No. 3.29 B. For Overall Project Format for Register of complaints and All project sites Monthly Monitor the implementation of Annexure No. 3.18 its reporting management measures through Reporting Format for Work Force All project sites Monthly site visits and approve the Annexure No. 3.30 Management reports monthly. Reporting Format for Occupational All project sites Monthly Annexure No. 3.31 Health and Safety Measures Reporting Format for Water Sprinkling All project sites Monthly Annexure No. 3.32 for Dust Suppression Reporting Format for Road Safety All project sites Monthly Annexure No. 3.33 Measures During Construction Reporting Format for Register of All project sites Monthly Annexure No. 3.34 Wilbur Smith Associates Pvt. Ltd. 5.5 Kerala State Trasport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road reporting / Monitoring format Applicable Project Frequency of reporting Frequency of reporting / Applicable annexure Site by Contractor Action to be taken by IE no. Accidents and it’s Reporting Reporting Format for Enhancement and All project sites Monthly Annexure No. 3.36 Mitigation of Common Property Resources Reporting Format for Tree Plantation All project sites Monthly Annexure No. 3.37 Reporting Format for Monthly Report All project sites Monthly Annexure No. 3.38 from Contractor to IE Reporting Format for monthly Report All project sites Nil Monthly Annexure No. 3.39 from CSC to PMT C. For Environmental Quality Monitoring Reporting Format for Environmental All project sites Monitoring is to be Verify the details through site Quality Monitoring conducted as per visits and approve the reports Environmental Quality monthly Monitoring plan in Table Annexure No. 3.35 5.2. To be submitted to CSC along with the Monthly report. Wilbur Smith Associates Pvt. Ltd. 5.6 Kerala State Trasport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road 5.2. Environmental Monitoring Plan for the Project The environmental monitoring plan for the project is presented in Table 5.2. For each of the environmental components, the monitoring plan specifies the technical aspects of monitoring like locations of monitoring; frequency of monitoring and duration, sampling method, parameters to be monitored, standards to be compared. The monitoring plan also specifies the applicable standards, and implementation and supervising responsibilities. Table 5.2. Environmental Monitoring Plan Technical Aspect Details of each Technical Aspect of Monitoring Air Quality Monitoring Project stage Construction and operation stages Parameter PM10, PM 2.5, SO2, NOx, and CO Sampling Method High volume air sampler to be located 50 m from the source of pollution in the downwind direction. Method specified by CPCB for analysis shall be followed. Standards Revised National Ambient Air Quality (NAAQ) Standards set by CPCB Frequency Once in every season for three seasons (except monsoon) per year for four years (Construction phase - Three years and Defect liability period – one year). Duration Continuous 24 hours / or for 1 full working day Locations along the Five locations i.e., Ettumanoor (Commercial area), near St. Anne’s Higher Project Road* Secondary School, Kurianad (silent zone), Govt. Hospital, Koothattukulam, and T.H.Q. Hospital, Moovattupuzha (silent zone). Other Locations** One monitoring station near each construction related facility namely, hot mix plant, stone crusher and quarry area along the project road during construction stage. Monitoring shall be done at each additional hot mix plant, if present. Measures Wherever air pollution parameters increase above specified standards, additional measures as decided by the engineer shall be adopted. Implementation Contractor through NABL approved monitoring agencies Supervision IE appointed by KSTP Water quality Monitoring Project stage Construction stage Parameter pH, BOD, COD, TDS, Pb, Oil & Grease, Detergents and Faecal Coliforms for Surface water. pH, TDS, Total hardness, Sulphate, Chloride, Fe, and Pb for groundwater. Sampling Method Grab sample collected from source and analysis as per Standard Methods for Examination of water and Waste water Standards Indian standards for Inland Surface Water (IS; 2296, 1982) and for Drinking water (IS; 10500,1991) Frequency Twice a year (pre monsoon and post monsoon seasons) during the entire construction period Duration One-time grab sampling Locations along the Surface water – Seven locations i.e., Pond at Ettumanoor, Pond at Project Road* Vempally, Canal at Vempally, Irrigation Canal at Kalikavu, Pond at Udayagiri Pond at Chorakuzhy and Canal at Aroor. Ground water – Three locations i.e., well at Kanakkary and open well at Uppukkandam, and open well at Valiamattom. Measures At locations of increased water pollution towards down stream, all inflow channels shall be checked for pollution loads and channel delivering higher pollution loads shall be terminated from disposal into the water source. Wilbur Smith Associates Pvt. Ltd. 5.7 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Technical Aspect Details of each Technical Aspect of Monitoring Implementation Contractor through NABL approved monitoring agencies Supervision IE appointed by KSTP Noise Level Monitoring Project stage Construction and operation stages Parameter Noise level on dB (A) scale Sampling Method Measure equivalent noise levels using an integrated noise level meter kept at a distance of 15m from edge of the pavement Standards Noise Pollution (Regulation and Control) Rules, 2000 Frequency Once in every seasons (except monsoon) for each year of construction. Duration Reading to be taken at 15 seconds interval for 15 minutes every hour for 24 hours and then average will be taken. Locations along the Five locations i.e., Ettumanoor (Commercial area), near St. Anne’s Higher Project road. Secondary School, Kurianad (silent zone), Govt. Hospital, Koothattukulam, Monitoring is to be and T.H.Q. Hospital, Moovattupuzha (silent zone). done by CSC using noise meter from KSTP Other Locations** Hot mix plant, stone crusher and quarry area. Monitoring shall be done at each additional hot mix plant, if present. Measures In case of noise levels causing disturbance to the sensitive receptors, management measures as suggested in the EMP shall be carried out. Implementation In location 1 by Environmental Engineer of SC using the instruments provided by KSTP and in locations 2 by the Contractor Supervision Environmental Engineer in EMU *Locations along the project stretch and cost is part of BOQ for Contractor. ** Locations mentioned here includes quarry, stone crusher site and construction camp. This activity is part of Contractor’s responsibility and related cost. Hence it is not covered under BOQ. Wilbur Smith Associates Pvt. Ltd. 5.8 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road Chapter 6. Environmental Budget 6.1. Environmental Budget to be Incurred by KSTP Environmental budget as detailed in Table 6.1 the cost of training to be imparted to staff of KSTP, cost of monitoring as per the monitoring plan in Table 5.2, vehicle purchase cost, mangrove afforestation cost and cost of oxbow land development. An amount of Rs 3,35,88,000 has been considered for KSTP II as environmental budget to be incurred by KSTP, which include, A. Environmental Training Cost. This includes environmental training for PMT staff and project level environmental training in Kerala at an expense of Rs. 6,00,000. B. Vehicle, travel and administrative costs. This includes cost of vehicle to be purchased and other travel and administrative costs. It is budgeted as Rs. 21,88,000. C. Noise monitoring & dissemination of information cost. Monitoring of noise at locations along the project stretch as listed in Table 5.2 vests upon CSC using the noise monitoring machine of KSTP. Based on this an amount of Rs. 8,000,00 has been budgeted under this head. Dissemination of information to public is also included in this item. D. Oxbow land development. It has been proposed by KSTP that type A and type B oxbow lands shall be developed in consultation with other government agencies by selecting activities which will be socially and economically feasible for its location and surroundings. A total amount of Rs. 3,00,00,000 has been budgeted for this. Table 6.1. Environmental Budget to be Incurred by KSTP Items Unit Quantity Unit Rate (Rs) Amount (Rs) A. Environmental Training Environmental training for Number 5 100000 5,00,000 PWD/PMT Staff and Modules preparation Project level Environmental Number 2 50000 1,00,000 Training In Kerala Subtotal 6,00,000 B. Travel and Administrative Costs for EMU Travel and Administrative Costs Month 36 18000 6,48,000 Vehicle Number 1 10,00,000 10,00,000 Maintenance of vehicle Month 36 15,000 5,40,000 Subtotal 21,88,000 C. Monitoring Equipments & Dissemination of Information Monitoring of Noise level Number 30 10,000 3,00,000 Dissemination of Information to Lump sum - - 5,00,000 Public Subtotal 8,00,000 D. Oxbow Land Development Development of type A and B Each 10 30,00,000 3,00,00,000 oxbow land Subtotal 3,00,00,000 Grand Total 3,35,88,000 Wilbur Smith Associates Pvt. Ltd. 6.1 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road 6.2. Contractor Items Requiring Environmental Management The Table 6.2 provides details of environmental mitigation measures undertaken for the project like tree planting and shrub planting along the road, for noise barriers, providing bus shelters, hand pumps etc. Table 6.2. Contract Items Included in Contractor Cost for Environmental Management (Contract BOQ Bill No 11) for Link 5 Description Unit Estimate Quantity Demolishing the existing compound wall of public building and clearing debris to cum 7,176 a designated location as approved by Engineer and constructing or raising Sound Insulating stone walls for silence zones as mentioned in table titled "EMAP" in the EMP. Providing hand pumps including provision made in RAP and as mentioned in No. 4 table titled "EMAP" in the EMP. Constructing bus shelter for all bus laybys as detailed in the design drawing and as Nos 54 mentioned in table titled "EMAP" in the EMP. Providing sign boards indicating major rivers, tourist location, pilgrim centres and Sqm 20 silent zones as mentioned in table titled "EMAP" in the EMP. Preserving and landscaping the cultural properties like shrines and hyundi as Nos 13 mentioned in table titled "EMAP" in the EMP. Demolishing the existing open well and reconstructing the same as mentioned in Nos 23 table titled "EMAP" in the EMP. Dismantling the existing water taps and providing new water taps as mentioned in Nos 33 table titled "EMAP" in the EMP. Developing parking space for the land acquired for auto rickshaws, cars and jeep sqm 3,700 as identified in the strip plan and as mentioned in table titled "EMAP" in the EMP. Providing landscaping with provision of solid waste collection (dust bin), sitting Nos 0 arrangement as per typical design drawings provided in EMP Planting of trees by the road side (avenue trees) in 0.60 m dia holes, 1 m deep dug Nos 1,182 in the ground, mixing the soil with decayed farm yard/sludge manure, planting the saplings, backfilling the trench, watering, fixing the tree guard and maintaining the plants for one year as mentioned in table titled "EMAP" in the EMP. Planting of trees on inner side of the sound insulating wall as noise barrier or green Nos 520 barrier for silence zones and maintaining them for one year as mentioned in table titled "EMAP" in the EMP. Providing and maintaining water sprayer in order to water the construction surface Hour 2,700 to suppress excessive dust in dry season in addition to watering for compaction as mentioned in table titled "EMAP" in the EMP. Air quality monitoring at five sensitive locations along the project road for three Nos 48 years (including defect liability period) by an NABL accredited Lab as mentioned in table titled "EMAP" in the EMP. Water Quality Monitoring at eleven major water bodies along the road during Nos 80 construction stage as mentioned in table titled "EMAP" in the EMP. Concrete flooring with slope drains and oil interceptors for hot mix plant area and Nos 3 work shop, vehicle washing and fuel handling area in construction camps as mentioned in table titled "EMAP" in the EMP. Construction related environmental management/mitigation related items are included in Contractor cost are tabulated in the project contract BOQ bill no 2 titled “Site Clearance� and Wilbur Smith Associates Pvt. Ltd. 6.2 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor - Moovattupuzha Road bill no 3 titled “Earth work�. These are tabulated Table 6.3 (Bill No 2) and Table 6.4 (Bill no 3) respectively. Construction related environmental mitigation items have been defined as the following and have been tabulated to account for the additional costs incurred for the measures specified. In several instances, these costs are negligible; the mitigation actions are part of good engineering practice and project management. Table 6.3. Contract Items Requiring Environmental Management Included in Contractor Cost for Site Clearance (Contract BOQ Bill No 2) for Link 5 Description Unit Estimated Quantity Removal of Stumps & Roots of trees above 300mm-600mm girth No. 242 Removal of Stumps & Roots of trees above 600mm-900mm girth No. 111 Removal of Stumps & Roots of trees above 900mm-1800mm girth. No. 394 Removal of Stumps & Roots of trees above 1800mm girth. No. 0 Dismantling Brick/Stone masonry structures including disposal of resulting cum 11 material and salvaging useful materials, complete Same as item no. 202-01, but for Plain cement concrete, complete cum 19 Same as item no. 202-01, but for RCC, complete cum 316 Same as item no. 202-01, but for Steel structures, complete tonne 1 Table 6.4. Contract Items Requiring Environmental Management Included in Contractor Cost for Earth Work (Contract BOQ Bill No 3) for Link 5 Description Unit Estimated Quantity Roadway excavation in ordinary soil, including haul and tip to all leads, cum 3,79,460 complete and as directed by the Engineer. Earth work in excavation for drain, including haul to tip, complete and as cum 55,581 directed by the Engineer Loosening and recompacting subgrade in all kinds of soil, complete and as cum 72,571 directed by the Engineer Earthwork in Excavation of foundation for structures, in ordinary soil, cum 50,316 including haul and tip to all leads, complete and as directed by the Engineer Construction of embankment and shoulder with approved material from cum 1,22,783 excavation of roadway, drains, culverts and other structures complete and as directed by the Engineer Construction of embankment with approved material from Borrow area, cum 0 complete and as directed by the Engineer at marshy areas Earthwork in fill for footpath and service duct, complete and as directed by cum 4,045 the Engineer Construction of subgrade from road way cut material, complete and as cum 64,000 directed by the Engineer Backfill behind abutment, wing walls, return walls for bridges, complete and cum 13,751 as directed by the Engineer Turfing side slope of roads and islands at major junctions with grass sods, sqm 9,738 complete and as directed by the Engineer Seeding and Mulching, complete and as directed by the Engineer sqm 200 Wilbur Smith Associates Pvt. Ltd. 6.3 Kerala State Transport Project Public Works Department Annexures Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road List of Annexures Annexure 3. 1. Guidelines for Siting, Management and Redevelopment of Construction Camps ........................................................................................................ 1 Annexure 3. 2. Guidelines for Siting, Management and Redevelopment of Labour Camps ........................................................................................................ 7 Annexure 3. 3. Guidelines for Siting, Management and Redevelopment of Quarrying and Stone Crushing Operations .............................................................. 12 Annexure 3. 4. Guidelines for Siting, Management and Redevelopment of Borrow Areas 18 Annexure 3. 5. Guidelines for Siting and Management of Debris Disposal Site ............ 23 Annexure 3. 6. Guidelines for Preparing Comprehensive Waste Management Plan...... 26 Annexure 3. 7. Guidelines for Top Soil Conservation and Reuse ................................... 30 Annexure 3. 8. Guidelines for Provision of Noise Barriers.............................................. 31 Annexure 3. 9. Guidelines to Ensure Worker’s Safety During Construction .................. 33 Annexure 3. 10. Guidelines for Preparation of Traffic Management Plan........................ 45 Annexure 3. 11. Guidelines for Storage, Handling, Use and Emergency Response for Hazardous Substances............................................................................. 49 Annexure 3. 12. Reporting Format for Identification of Construction Camp Site............ 52 Annexure 3. 13. Reporting Formats for Identification of Labour Camp Site ................... 54 Annexure 3. 14. Reporting Format for Identification of Quarry and Stone Crusher Site . 56 Annexure 3. 15. Reporting Format for Identification of Borrow Areas............................. 58 Annexure 3. 16. Reporting Format for Identification of Debris Disposal Site ................. 60 Annexure 3. 17. Reporting Format for Identification of Sources of Water for Construction 62 Annexure 3. 18. Format for Register of Complaints and it’s Reporting............................ 64 Annexure 3. 19. Format for Register of Sites Opened and Closed And it’s Reporting ..... 65 Annexure 3. 20. Checklist for Monitoring of Construction Camp Management.............. 66 Annexure 3. 21. Checklist for Monitoring of Labour Camp Management ....................... 69 Annexure 3. 22. Checklist for Monitoring of Quarry and Stone Crusher Management ... 72 Annexure 3. 23. Checklist for Monitoring of Borrow Area Management ......................... 76 Annexure 3. 24. Checklist for The Monitoring of Debris Disposal Site Management ..... 79 Annexure 3. 24.a. Checklist for The Monitoring of Traffic Management ................... 82 Annexure 3. 25. Checklist for Monitoring of Redevelopment of Construction Camp Site84 Annexure 3. 26. Check List for Monitoring of Redevelopment of Labour Camp Site...... 86 Annexure 3. 27. Checklist for Monitoring of Redevelopment of Quarry and Stone Crusher Site 88 Annexure 3. 28. Checklist for Monitoring of Redevelopment of Borrow Areas................ 91 Annexure 3. 29. Checklist for Monitoring of Redevelopment of Debris Disposal Site..... 93 Annexure 3. 30. Reporting Format for Work Force Management .................................... 95 Annexure 3. 31. Reporting Format for Occupational Health and Safety Measures ......... 99 Wilbur Smith Associates Pvt. Ltd. iii Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexure 3. 32. Reporting Format for Water Sprinkling for Dust Suppression ..............102 Annexure 3. 33. Reporting Format for Road Safety Measures During Construction ......104 Annexure 3. 34. Format for Register of Accidents and it’s Reporting .............................108 Annexure 3. 35. Reporting Format for Environmental Pollution Monitoring ................. 111 Annexure 3. 36. Reporting Format for Enhancement and Mitigation of Common Property Resources ................................................................................. 114 Annexure 3. 37. Reporting Format for Tree Plantation.................................................... 117 Annexure 3. 38. Reporting Format for Monthly Report from Contractor to Construction Supervision Consultant ........................................................................... 119 Annexure 3. 39. Reporting Format for Monthly Report from CSC to PMT.....................125 Annexure 3. 40. List of Permission to be Obtained by the Contractor ............................132 Annexure 3. 41. Proposed Chainages of Retaining Wall Location where Embankment Height will be Raised .............................................................................134 Annexure 3. 42. List of Public Water Sources along Link 5 .............................................138 Annexure 3. 43. Details Proposed Bus Stops and Bus Bays Locations ...........................139 Annexure 3. 44. Sensitive Noise Receptors along Link 5.................................................140 Annexure 3. 45. Most Likely Flood Prone Sections along Link 5 .................................... 141 Annexure 3. 46. Water Bodies along Link 5, Impact, Mitigation and Enhancement......142 Annexure 3. 47. Quarry and Borrow Areas near Link 5....................................................143 Annexure 3. 48. Material Sources Available near Link 5 ..................................................145 Annexure 3. 49. Details of Likely Tree Removal along Link 5.........................................146 Annexure 3. 50. Landscaping, Tree Planting and Environmental Enhancement Plan...148 Annexure 3. 51. Auto-Jeep- Tempo -Taxi Stands – Existing and Proposed....................162 Annexure 3. 52. Listed NGOs in the Region....................................................................163 Annexure 3. 53. Environmental Enhancement Drawings................................................164 Annexure 3. 54. Spoil and Scarified Material Disposal Plan for Link 5 ...........................166 Annexure 3. 55. Cultural Properties Rehabilitation Measures .........................................167 Wilbur Smith Associates Pvt. Ltd. iv Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 1. Guidelines for Siting, Management and Redevelopment of Construction Camps A. OVERVIEW Construction camp accommodates a mix of activities, which are highly polluting in nature causing considerable environmental impact and its proper siting, management and redevelopment is crucial to avoid, minimize and mitigate those impacts. The EMAP clearly distinguishes between various impacts that may occur at various stages of the camp like (i) siting, (ii) setting up, (iii) operation and (iv) closure / redevelopment and provide respective mitigation measures to some extent. In addition to that, this guideline has been prepared to provide the Contractor with comprehensive and systematic information on various steps to be undertaken during these four stages, so that s/he can execute his/her role in an environmentally sound manner. Various mitigation measures have been synthesized into this guideline so that it serves as a single and stand alone document for the Contractor . B. CRITERIA FOR SITING THE CAMP To the extent, possible barren land or wastelands shall be preferred during site selection and fertile land and agricultural land shall be avoided. All such sites must be above the HFL with adequate drainage facility. In areas prone to floods, cyclones, cloudbursts or heavy rainfall, selection of the site should be made keeping in mind the safety of the camp and the workers. In addition, the Contractor should take care of the following criteria for locating the site:  A minimum of 250 m away from any major settlement or village in downwind direction.  A minimum of 200 m of any major surface water course or body1  Not within 500 m from ecologically sensitive areas like wild life sanctuary, mangroves etc.  Sufficiently wide access roads (at least 5.5 m Wide) for heavy vehicle movements After identification of the site the Contractor should fill up the prescribed reporting format and submit the same for approval to the CSC without which any activity shouldn’t be started on the site C. FINALIZATION OF SELECTED SITE/S After identification of the site, the Contractor should fill up the prescribed reporting format provided in EMAP and submit the same for approval to the CSC. Environmental Officer of CSC shall approve the selected site/s, after considering the compliance with the EMP clauses. No agreements or payments shall be made to the land owner/s prior to receipt of a written approval from the CSC. Any consequence of rejection prior to the approval shall be the responsibility of the Contractor and shall be made good at his own cost. After obtaining a written approval from the CSC for the selected site, the Contractor has to enter into an agreement with the landowner to obtain his/her consent before commencing any operation / activities in the land. The agreement should also mention its type, duration, amount and mode of payment as well as the preferences of the owner regarding site maintenance and redevelopment. 1 In the absence of site meeting the stipulated criteria, an alternate site can be selected specifying the reasons. In such a case, the construction camp management plan should incorporate additional measures specific to the site as suggested by the CSC. Wilbur Smith Associates Pvt. Ltd. A.1 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures D. DESIGNING OF CAMP / PREPARATION OF LAYOUT PLAN The Contractor should design a layout plan of the camp with adequate space for (i) site office along with store room, rest area and sanitary facilities, (ii) plants, machineries, (iii) workshops, (iv) vehicle washing area, (v) fuel handling area, (vi) room for raw material unloading and stocking, (vii) space for storage and handling of solid wastes (viii) security cabin etc. The laying out of these should be undertaken in such a manner that it facilitates smooth functioning of both man and machine. Fuel pumps, storage facility for inflammable and hazardous chemicals/ materials shall be provided inside the camp, but at a safe distance from office. Electric safety practices shall be integrated/ incorporated during the lay-out plan preparation. Prevailing wind direction shall be kept in mind while planning out the lay-out of internal facilities. Cutting of trees should be minimum and the existing ones need to be integrated into the lay-out plan with proper planning. The roads within the camp should be well planned with adequate space for movement of vehicles and their parking. E. SETTING UP OF CONSTRUCTION CAMP (i) Site preparation: The stripping, stacking and preservation of top soil will be mandatory in case of farm lands and fertile areas and absolutely no material stacking or equipment installment or vehicle parking or any other activity should be allowed prior to the satisfactory completion of this activity as per guidelines in EMP. Thereafter, the site should be graded and rendered free from depressions such that the water does not get stagnant anywhere. A compound wall of 2.4 m height should be constructed all around the camp to prevent the trespassing of humans and animals. Green belt should be provided along the boundary and as detailed in the EMP, it should be integrated with storm water drain and sedimentation trenches as given in annexure in EMAP. No. of trees planted should not be less than three times the number of trees cut. The approved layout plan should be strictly adhered to while setting up the camp. (ii) Setting up of plants and machineries: Adequate arrangements should be made for avoiding fugitive emissions from plants and camp premises. This will include (i) control of air pollution through provision of in-built dust extraction systems like bag filter, damper and cyclone filter for bitumen hot mix plant, (ii) a chimney of appropriate height (as per SPCB guideline) from ground level attached with dust extraction system and scrubber for the hot mix plant, (iii) a chimney of appropriate height for the DG set (iv) water sprinkling facilities for the concrete batching plant, wet mix macadam plant as well as in the camp premises and (v) garden net to prevent fugitive emissions from storage place of cement and aggregates.. It has to be also ensured that effluent from the sludge tank of the scrubber is recycled and reused and the sludge is used for land filling with top soil spread on it. To ensure that noise levels are within the limit, all plants and machineries should have their own silencers or any other noise control devices. All pollution control devices should be provided with back up power. Following conditions should be complied regarding the sound level conditions:  The sound level (Leq) measured at a distance of 1 m from the boundary of the site shall not exceed 55dB (A) during day time (6am - 6pm) and 45 dB(A) during night time (6 pm - 6am).  The total sound power level of the DG set shall be less than 96+10 log 10 (KVA) dB(A) where KVA is the nominal power rating of DG set. Wilbur Smith Associates Pvt. Ltd. A.2 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures  The DG set shall be provided with acoustic enclosure/acoustic treatment with an insertion loss of minimum 25 dB(A).  The DG set shall be provided with proper exhaust muffler with insertion loss of minimum 25 dB(A).  A proper, routine and preventive maintenance procedure for the DG set shall be set and followed in consultation with the DG set manufacturer.  Concrete flooring with slope drains and oil interceptors should be proposed for hot mix plant area and workshop, vehicle washing and fuel handling area as per EMP, so that oil and lubricants that may spill on the floor does not contaminate any soil or water body. In case of any oil spills, it should be cleaned properly. There shall also be provisions for storage of used oil until it is disposed as per comprehensive waste management plan prepared by Contractor and approved by CSC. (iii) Sanitation Facilities: Adequate no. of toilets shall be provided separately for males and females (depending on their strength), screened from those of men and provided with markings in vernacular language. All such facilities must have adequate water supply with proper drainage and effluent treatment system like septic tank with soak pit. Soak pit should have a sealed bottom, honey comb wall and 75 cm. thick, 2 mm sand envelope around that. The sewage system for the camp must be properly sited, designed, built and operated so that no health hazard occurs and no pollution to the air, ground or adjacent watercourses takes place. Portable toilets may be brought to use and the night soil from such units has to be disposed through designated septic tanks so as to prevent pollution of the surrounding areas. In the construction camp, no night soil or sewerage shall be disposed of at any place other than the septic tanks constructed at the site. (iv) Waste Disposal: While preparing the layout plan, the Contractor should allocate adequate space for storage and handling of various wastes generated until they are disposed off in pre-identified disposal sites. The Contractor should provide separate garbage bins for biodegradable, non-biodegradable and domestic hazardous wastes in the camps and ensure that these are regularly emptied and disposed off in a hygienic manner. No incineration or burning of wastes shall be carried out by the Contractor . The disposal of any biodegradable matter shall be carried out in pits covered with a layer of earth within the camp site. Discarded plastic bags, paper and paper products, bottles, packaging material, gunny bags, hessian, metal containers, strips and scraps of metal, PVC pipe scrubber and poly urethane foam, auto mobile spares, tubes, tires, belts, filters, waste oil, drums and other such materials shall be either reused or sold /given out for recycling. POL (petroleum, oil and lubricants) waste shall be disposed off by transfer only to recycler/ re-refiners possessing valid authorization from the State Pollution Control Board and valid registration from the Central Pollution Control Board. Used lead batteries, if any, should be disposed as per the Batteries (Management and Handling) Rules 2001. (v) First aid / safety facilities: At every camp site, a readily available first-aid unit including an adequate supply of sterilized dressing materials and appliances should be provided. Workplaces which are remote and far away from regular hospitals should have indoor health units with one bed for every 250 workers. Details of nearest clinics as well as major hospitals like their location, distance from camp, phone nos. facilities offered by the hospital should be displayed in the camp office at clearly visible location in a legible manner. Suitable transport should be provided to facilitate taking injured and ill Wilbur Smith Associates Pvt. Ltd. A.3 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures persons to the nearest hospital. Adequate personal protective equipments and fire fighting equipments as detailed out in EMP should be made available in the camp and provided to the staff / workers. Operation manuals and training should be provided to machine operators. Warning signs should be placed at accident prone areas as well as at the entrance of the site. (vi) Training to workers: Workers shall be trained in smooth operation of plants and machines, their regular maintenance and various safety measures to be followed as well as about the need for adherence to these measures. (vii) Information dissemination: There should be a sign board of size 6’ x 4’ mentioning the project details and Contractor ’s details to disseminate the information to the public. There should be a second sign board displaying the latest air and noise monitoring data against the standards specified. Warning signboards should be set up at the entrance gate for the public as well as at other required places for the workers to alert them about the nature of operation being undertaken at those respective places. Once the construction camp is set up, the date of commissioning of the camp should be intimated to the Head Office and concerned District Office of the SPCB. F. OPERATION OF CONSTRUCTION CAMP During the operation phase of the camp it is important to ensure that all vehicles and machineries are maintained regularly and their PUC certificates are renewed at regular intervals. All pollution control devices should be monitored and maintained properly at regular intervals. In case of process disturbance/ failure of pollution control equipments, the respective units should be shut down and should not be restarted until the control measures are rectified to achieve the desired efficiency. All units should operate only between 6 am and 10 pm. or as specified by SPCB in the consent letter. Oil and grease waste generated from garages in construction camps should be drained out through oil interceptors and they should be maintained properly. Necessary arrangements should be made for regular sprinkling of water for dust suppression. Raw materials and products should be transported with proper cover to prevent spreading of dust. Hygienic environment must be ensured by (i) provision of safe drinking water, (ii) proper maintenance of toilets including daily cleaning and disinfection using proper disinfectants, (iii) regular cleaning of drains by removing the silt and solid waste, (if any) and iv) appropriate waste management practices. While it is of utmost importance to ensure that fire fighting equipments like fire extinguishers are in working condition, it should also be monitored that construction workers use the personal protective equipments provided to them and they are replaced when necessary. All these facilities should be inspected on a weekly basis to achieve the desired levels of safety and hygiene standards. Environmental monitoring should be undertaken by the Contractor as stipulated in the EMP. If any standard is set by SPCB for hot mix plant emissions, the Contractor should collect samples of emission from all the chimneys and analyse for the parameters at least once in a month. The CTE certificate from SPCB should be renewed at regular intervals and the same should be intimated to CSC. A register should be maintained at the site office which provides (i) a one page format for each migrant labourer which will give their personal profile (including name, age, sex, educational qualification, address, blood group and any major illness), along with a copy of any ID proof and an original Wilbur Smith Associates Pvt. Ltd. A.4 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures photograph, (ii) a copy of the ID card of local labourers. A copy of the details of the migrant labourers should be submitted to the local police station. G. PREPARATION OF CONSTRUCTION CAMP MANAGEMENT AND REDEVELOPMENT PLAN After the site for the construction camp has been finalized and approved by CSC, the Contractor should prepare a construction camp management plan to be submitted to CSC for approval prior to setting up of the camp and it should comprise the following details:  Section–1: Details of site: Copy of approved site identification report along with location plan on a village map or an FMB, showing the site, its survey no., access road, project stretch, distance form the project stretch, surrounding features and land use like residences, agricultural land, water bodies etc., photograph of the site showing the topography and other existing features.  Section-2: Site preparation: Activities that will be undertaken for preparing the site based on EMP and this guideline.  Section-3: Arrangements/ facilities within the camp: List of plants / machineries to be set up within the camp like hot mix plant, batching plant, DG set etc., and other facilities to be provided like site office, store room, rest room, toilet room, material stocking yard etc, layout plan showing all these details along with vehicular movement path, green belt etc. Species wise no. of trees to be cut shall be provided.  Section-4: Mitigation measures that will be undertaken as per the EMP and this guideline while setting up of the camp and operation of the camp should be separately listed out here.  Sectoin-5: Other details: Any other relevant detail like list of trainings to be provided to workers, details of information dissemination, date of CTE certificate from SPCB, its validity, additional conditions laid down in it etc. should be included.  Section 6: Re-development plan, which should indicate the following points: (i) List of structures to be demolished and list of the clean up activities that needs to be undertaken, (ii) Proposed use of the land after de-mobilising and (iii) Presence of facilities that could be put in use by the land owner if it is a leased out private land or community in case of a public property.  Section-7: Annexure-(a) Working drawings: Electrical plan showing the electrical network planned for the site, location of plants, generators, master switch boards etc. and plumbing drawing showing the network of water supply lines, sewerage line and drainage line, (b) Copy of certificates / permissions obtained from regulatory authorities / local governing body / community etc. as applicable, (c) Copy of agreement entered with the owner of the site if it is a leased out land. All the drawings should have north direction marked in it along with prevailing wind direction. Necessary dimensions and specifications should be provided where ever necessary. The construction camp management plan should be submitted to the CSC for a written approval before any physical work (includes storage of materials, equipment etc.) is undertaken on a particular site. The CSC shall carefully examine the proposals considering the specific conditions of each site as well as various EMP and regulatory provisions and provide suggestions, as necessary to the Contractor who shall incorporate it in the management plan. Wilbur Smith Associates Pvt. Ltd. A.5 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Contractor needs to prepare this document for each different site identified and CSC shall undertake a thorough analysis of the said management and redevelopment plan through a site investigation and suggest additional mitigation measures depending on the site and as demanded by the features of the specific site. H. DEMOBILIZATION AND REDEVELOPMENT OF THE SITE The Contractor should clear all temporary structures; dispose all building debris, garbage, night soils and POL waste as per the approved debris management plan. All disposal pits or trenches should be filled in, disinfected and effectively sealed off. All the areas within the camp site should be leveled and spread over with stored top soil. Residual topsoil, if any will be distributed or spread evenly in plantation sites, on adjoining/near-by barren land or affected agricultural land adjacent to the RoW that has been impacted on account of any accidental spillage. Entire camp area should be left clean and tidy, in a manner keeping the adjacent lands neat and clear, at the Contractor ’s expense, to the entire satisfaction of landowner and CSC. These activities should be completed by the Contractor prior to demobilization. Once the Contractor finishes his job, he needs to obtain a certificate from the owner, stating that the site has been re- developed to his/her satisfaction and in tune with the agreement. Then following documents needs to be submitted to the CSC by the Contractor :  Copy of approved site identification report  Photographs of the concerned site ‘before’ and ‘after’ setting up the camp.  Certificate from the owner stating his/her satisfaction about status of re-development of the site. IE shall ensure, through site verification that all clean-up and restoration operations are completed satisfactorily and a written approval should be given to the Contractor mentioning the same before the ‘works completion’ certificate is issued/recommended. The PMT shall ensure through site inspection that the Contractor and CSC have complied with all these provisions. The site can then be handed over to the concerned owner or local bodies or for local communities as the case may be. Certification/documentation pertaining to approval for clean-up and restoration operations and thereafter handing-over to the owner shall be properly maintained by the Contractor , Supervision Consultant and PMT. Wilbur Smith Associates Pvt. Ltd. A.6 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 2. Guidelines for Siting, Management and Redevelopment of Labour Camps A. OVERVIEW Staff-quarters include accommodation for Engineers / Supervisors and labour camp include accommodation for workers / labourers along with other basic amenities such as kitchen, potable water supply, sanitation (toilets, bathrooms, washing areas and water supply for such needs), first aid room as well as garbage collection and disposal facility. Staff quarters shall be provided with additional facilities of drawing room. The guidelines outlined here aims to facilitate the Contractor in implementing the measures in the EMP there by reducing the impact on the environment. B. CRITERIA FOR LOCATING THE SITE/S Following criteria should be followed in the siting of labour camps:  To the extent possible, agricultural lands and fertile lands shall be avoided2.  Not to be located in CRZ area.  Not within 500m of ecologically sensitive areas like wild life, sanctuary, mangroves, forest etc. C. FINALIZATION OF SELECTED SITE/S After identification of the site, the Contractor should fill up the prescribed reporting format provided in EMAP and submit the same for approval to the CSC. The selected site/s shall be approved by Environmental Officer of CSC, after considering the compliance with the EMP clauses. No agreements or payments shall be made to the land owner/s prior to receipt of a written approval from the CSC. Any consequence of rejection prior to the approval shall be the responsibility of the Contractor and shall be made good at his own cost. After obtaining a written approval from the CSC for the selected site, the Contractor has to enter into an agreement with the landowner to obtain his/her consent before commencing any operation / activities in the land. The agreement should also mention its type, duration, amount and mode of payment as well as the preferences of the owner regarding site maintenance and redevelopment. D. DESIGNING AND SETTING UP OF LABOUR CAMP Following facilities should be provided in a labour camp to ensure safe, clean and hygienic accommodation for the workers. (i) Site preparation: The site should be graded and rendered free from depressions such that the water does not get stagnant anywhere. Fencing should be constructed all around the camp to prevent the trespassing of humans and animals. Green belt should be provided along the boundary and as detailed in the EMP, it should be integrated with storm water drain and sedimentation trenches as given in annexure in EMAP. No. of trees planted should not be less than three times the number of trees cut. The approved layout plan should be strictly adhered to while setting up the camp. 2 In the absence of site meeting the stipulated criteria, an alternate site can be selected specifying the reasons. In such a case, the construction camp management plan should incorporate additional measures specific to the site as suggested by the CSC. Wilbur Smith Associates Pvt. Ltd. A.7 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures (ii) Accommodation: Contractor will follow all relevant provisions of the Factories Act, 1948 and the Building and the other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996 for construction and maintenance of labour camp. The height of the worker’s and labour accommodation shall not be less than 3mt. from floor level to the lowest part of the roof. The camps shall be floored with concrete, shall be kept clean, with proper cross ventilation, and the space provided shall be on the basis of one sq.mt per head or as per the relevant regulation, which ever is higher. Fire and electrical safety pre-cautions shall be adhered to. Cooking, sanitation and washing areas shall be provided separately. The Contractor will maintain necessary living accommodation and ancillary facilities (including provision of clean fuel to prevent damage to forests and to prevent fuel wood cutting and burning by labour) in functional and hygienic manner. The site must be graded and rendered free from depressions such that water does not get stagnant anywhere. The entire boundary of the site should be fenced all around with barbed wire so as to prevent the trespassing of humans and animals. Green belt should be provided along the boundary and it should be integrated with storm water drain and sedimentation trenches to reduce the surface run off as per clauses in EMAP. No. of trees planted should not be less than three times the number of trees cut. (iii) Drinking Water: The Contractor should provide potable water within the precincts of every workplace in a cool and shaded area, which is easily accessible as per standards set by the Building and other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996. All potable water storage facilities will be on a safely raised platform that is at least 1m above the surrounding ground level. Such facilities shall be regularly maintained from health and hygiene point of view. If necessary water purifier units shall be installed for providing potable water. As far as possible shallow wells should not be used as potable source of water. However, if water is drawn from any existing well, irrespective of its location from any polluting sources, regular disinfection of the water source (which may include application of lime, bleaching power and potassium permanganate solution) has to be ensured at weekly/fort nightly interval. All open wells will be entirely covered and will be provided with a trap door to prevent accidental fall and contamination from dust, litter etc. The trap door will be kept locked and opened only for cleaning or inspection, which will be done at least once in a month. A reliable pump will be fitted to each covered well. A drain shall be constructed around the well to prevent flow of contaminated water into the well from road, camp or other sources. Water quality testing of all potable water sources will be done every six months as per parameters prescribed in IS 10500:1991. (iv) Sanitation Facilities: Adequate no. of toilets shall be provided separately for males and females (depending on their strength), screened from those of men and provided with markings in vernacular language. All such facilities must have adequate water supply with proper drainage and disposal facility. They shall be maintained, cleaned and disinfected daily using proper disinfectants. Location and design of soak pit should be in such a way that it doesn’t pollute the ground water. Drains and ditches should be treated with bleaching powder on a regular basis. The sewage system for the camp must be properly designed, built and operated so that no health hazard occurs and no pollution to the air, ground or adjacent watercourses takes place. Portable toilets may be brought to use and the night soil from such units has to be disposed through designated septic tanks so as to prevent pollution of the surrounding areas. In the main camp, no night soil or sewerage shall be disposed of at any place other than the septic tanks constructed at the site. All these facilities shall be inspected on a weekly basis to check the hygiene standards. Wilbur Smith Associates Pvt. Ltd. A.8 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures (v) Waste Disposal: The Contractor should provide garbage bins in the camps and ensure that these are regularly emptied and disposed off in a hygienic manner. No incineration or burning of wastes shall be carried out by the Contractor . Separate bins shall be provided for biodegradable, non-biodegradable and domestic hazardous wastes. The disposal of kitchen waste and other biodegradable matter shall be carried out in pits covered with a layer of earth within the camp site. The Contractor may use the compost from such wastes as manure in the plantation sites. Discarded plastic bags, paper and paper products, bottles, packaging material, gunny bags, hessian, metal containers, strips and scraps of metal, PVC pipe scrubber and poly urethane foam, auto mobile spares, tubes, tires, belts, filters, waste oil, drums and other such materials shall be either reused or sold /given out for recycling. (vi) Day Crèche Facility: At every construction site, provision of a day crèche shall be made so as to enable women to leave behind their children while going to work. At least one attendant shall be provided to take care of the children at the crèche. At construction sites where 20 or more women are employed, there shall be at least one shelter for use of children under the age of 6 years belonging to such women. Shelters shall not be constructed to a standard lower than that of thatched roof, mud walls and floor with wooden planks spread over mud floor and covered with matting. Such areas shall be safely barricaded (no sharp sheets or barbed wires that may injure a child) from rest of the camp for the safety of children. Shelters shall be provided with suitable and sufficient openings for light and ventilation. There shall be adequate provision to keep the place clean. The size of a crèche may vary according to the number of children on a camp site. (vii) Mess and Kitchen Facilities: The Contractor shall adhere to the sanitary/hygiene requirements of local medical, health and municipal authorities at all times. Adopt such precautions as may be necessary to prevent soil and water pollution at the site while operating mess or kitchen facilities. (viii) First aid facilities: At every workplace, a readily available first-aid unit including an adequate supply of sterilized dressing materials and appliances should be provided. Workplaces remote and far away from regular hospitals should have indoor health units with one bed for every 250 workers. Suitable transport should be provided to facilitate taking injured and ill persons to the nearest hospital. Adequate personal protective equipments and fire fighting equipments as detailed out in EMP should be made available in the camp and provided to the staff / workers. (ix) Health Care Facilities: Health problems of the workers should be taken care of by providing basic health care facilities. If there is no hospital or clinic, which can be accessed in half an hour’s time, then a temporary health center should be set up for the construction camp. The health centre should have at least a doctor and a nurse, duty staff, medicines and minimum medical facilities to tackle first aid requirements or minor accidental cases, linkage with nearest higher order hospital to refer patients of major illnesses or critical cases. The health centre should have MCW (Mother and Child Welfare) units for treating mothers and children in the camp. Apart from this, the health centre should be provided with regular vaccinations required for children. The health centre should carryout quarterly awareness programme of HIV – AIDS with the help of AIDS control society as well as about community living and hygiene practices in day to day living. Posters should be exhibited in the health care clinic. E. OPERATION OF LABOUR CAMP Wilbur Smith Associates Pvt. Ltd. A.9 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Through out the functioning period of the camp, hygienic environment must be ensured by (i) provision of safe drinking water, (ii) proper maintenance of toilets including daily cleaning and disinfection using proper disinfectants, (iii) regular cleaning of drains by removing the silt and solid waste, (if any) and iv) appropriate waste management practices. While it is of utmost importance to ensure that fire-fighting equipments like fire extinguishers are in working condition, it should also be monitored that construction workers use the personal protective equipments provided to them and they are replaced when necessary. All these facilities should be inspected on a weekly basis to achieve the desired levels of safety and hygiene standards. F. PREPARATION OF LABOUR CAMP MANAGEMENT AND RE-DEVELOPMENT PLAN After the site for the labour camp has been finalized and approved by CSC, the Contractor should prepare a labour camp management and redevelopment plan to be submitted to CSC for approval prior to setting up of the camp and it should comprise the following details:  Section–1: Details of site: Copy of approved site identification report along with location plan on a village map or an FMB, showing the site, its survey no., access road, project stretch, distance form the project stretch, surrounding features and land use like residences, agricultural land, water bodies etc., photograph of the site showing the topography and other existing features.  Section-2: Site preparation: Activities that should be undertaken for preparing the site based on EMP and this guideline.  Section-3: Arrangements/ facilities within the camp: List of facilities to be provided along with its details like area, no of people to be accommodated and a layout plan showing the plan of the site with all the facilities planned like quarters, labour camps, mess, common facilities, toilet facilities and the vehicular and pedestrian movement paths.  Section-4: Mitigation measures that should be undertaken as per the EMP and this guideline while setting up of the camp and operation of the camp should be separately listed out here.  Sectoin-5: Other details: Any other relevant detail like list of awareness camps to be provided to workers, details of information dissemination etc. should be included.  Section 6: Re-development plan: which should indicate following points: (i) List of structures to be demolished and list of the clean up activities that needs to be undertaken, (ii) Proposed use of the land in the post construction phase, if it is a public property, (iii) Presence of existing facilities that could be put in use by the land owner if it is a leased out private land or by the community in case of a public property.  Section-7: Annexure-(a) Working drawings: Electrical plan showing the electrical network planned for the site, location of generators, master switch boards etc. and plumbing drawing showing the network of water supply lines, water tank, drainage facilities etc. (b) Copy of permissions obtained from local governing body / community etc. as applicable, (c) Copy of agreement entered with site owner, in case of leased out sites. All the drawings should have north direction marked in it along with prevailing wind direction. Necessary dimensions and specifications should be provided where ever necessary. The labour camp management plan should be submitted to the CSC for a written approval before any physical work is Wilbur Smith Associates Pvt. Ltd. A.10 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures undertaken on a particular site. The CSC will carefully examine the proposals in light of the various EMP and regulatory provisions and provide suggestions, as necessary to the Contractor who shall incorporate it in the management plan. Contractor shall be responsible for satisfactory and timely completion of these EMP requirements. Contractor needs to prepare this document for each different site identified and CSC shall undertake a thorough analysis of the said management and redevelopment plan through a site investigation and suggest additional mitigation measures depending on the site and as demanded by the features of the specific site. G. RE DEVELOPMENT OF THE LABOUR CAMP The Contractor should clear all temporary structures; dispose all building debris, garbage, night soils and any other waste as per the approved debris management plan. All disposal pits or trenches should be filled in, disinfected and effectively sealed off. Residual topsoil, if any will be distributed or spread evenly in plantation sites, on adjoining/near-by barren land or affected agricultural land adjacent to the RoW that has been impacted on account of any accidental spillage. Entire camp area should be left clean and tidy, in a manner keeping the adjacent lands neat and clear, at the Contractor ’s expense, to the entire satisfaction of landowner and the CSC. These activities should be completed by the Contractor prior to demobilization. Once the Contractor finishes his job, he needs to obtain a certificate from the owner, stating that the site has been re- developed to his/her satisfaction and in tune with the agreement. Then following documents needs to be submitted to the CSC by the Contractor :  Copy of approved site identification report  Photographs of the concerned site ‘before’ and ‘after’ setting up the camp.  Certificate from the owner stating his/her satisfaction about status of re-development of the site. IE shall ensure, through site verification that all clean-up and restoration operations are completed satisfactorily and a written approval should be given to the Contractor mentioning the same before the ‘works completion’ certificate is issued/recommended. The PMT shall ensure through site inspection that the Contractor and CSC have complied with all these provisions. The site can then be handed over to the concerned owner or local bodies or for local communities as the case may be. Certification/documentation pertaining to approval for clean-up and restoration operations and thereafter handing-over to the owner shall be properly maintained by the Contractor , Supervision Consultant and PMT. Wilbur Smith Associates Pvt. Ltd. A.11 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 3. Guidelines for Siting, Management and Redevelopment of Quarrying and Stone Crushing Operations A. OVERVIEW A quarry is a type of open-pit mine from which rock or minerals are extracted for building materials, such as dimension stone, construction aggregate, riprap, sand, and gravel. Quarrying causes lot of environmental damages like air and noise pollution, water logging etc. and requires permission from regulatory authorities like mining department. It requires a careful approach in the site selection process, scientific method of quarrying and appropriate measures to redevelop it. B. CRITERIA FOR LOCATING THE SITE/S The selection of a quarry is sole responsibility of the Contractor and should be undertaken in adherence to the rules & regulations of the authorities. Following criteria should be followed while selecting a quarry site:  To the extent possible barren land or waste lands shall be preferred during site selection and fertile land and agricultural land shall be avoided.  There shall be no quarrying of sand in any river bed or adjoining area or any other area which is located within 500 meters radial distance from the location of any bridge, water supply system, infiltration well or pumping installation of any of the local bodies or Central or State Government Department or any area identified for locating water supply schemes by any of the Government Department or other bodies.  Quarry site shall be located at a minimum distance of: 500 m from any human settlements, public road, railway line, national highway, state highway or major district road.  Stone quarry shall be located at a minimum distance of 50 m from any water body.  Locate the quarry and crusher at a min. distance of 500 m. away from forests / wildlife habitats / mangroves / ecologically sensitive areas.  The minimum distance between two stone crushers should be 1 km to avoid dust pollution influence of one over the other.  Stone crushing unit should be distanced for 500 m from the NH or SH or residential area or places of public and religious interests.  Access roads to quarry sites must be wide enough for heavy vehicle movement without inconvenience to local traffic. After identification of the site, Contractor should fill up the prescribed reporting format and submit the same for approval to the CSC without which any activity shouldn’t be started on the site. C. FINALIZATION OF SELECTED SITE/S After identification of the site, the Contractor should fill up the prescribed reporting format provided in EMAP and submit the same for approval to the CSC. The selected site/s shall be approved by Environmental Officer of CSC, after considering the compliance with the EMP clauses. No agreements or payments shall be made to the land owner/s (in case of a leased or rented out land) prior to receipt of a written approval from the CSC. Any consequence of rejection prior to the approval shall be the Wilbur Smith Associates Pvt. Ltd. A.12 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures responsibility of the Contractor and shall be made good at his own cost. After obtaining a written approval from the CSC for the selected site, the Contractor has to enter into an agreement with the land owner to obtain his/her consent before commencing any operation / activities in the land. The agreement should also mention its type, duration, amount and mode of payment as well as the preferences of the owner regarding site maintenance and redevelopment. D. SETTING UP OF QUARRYING AND STONE CRUSHER Quarrying involves not only extraction of material (rock) but also crushing and screening that makes the rock suitable for use as construction material. Following are the major parameters to be considered before the start of quarrying and stone crushing operations: (i) Site preparation: The stripping, stacking and preservation of top soil will be mandatory and absolutely no activity should be allowed prior to the satisfactory completion of this conservation measure as per guidelines in EMAP. The boundary of the quarry should be demarcated using barbed wire fencing in order to avoid the future dispute over land as well as to avoid accidental trespassing of people. There should be recorded documents of exact no of trees cut. Green belt should be provided all along the quarry site to function as both noise attenuators and dust collectors and number of trees planted should not be less than three times the number of trees cut. Contour trenches should be dug along the borrow area boundary and at any other appropriate places considering the topography to reduce the surface run off and conserve soil and water. Side slopes shall be constructed with slope drains at applicable locations, to provide drainage and avoid any land slides. All the drainage constructed should be linked to existing drainages in order to avoid flooding and water logging. (ii) Setting up of a quarry site: The layout of a quarry should provide a gravity flow of material from the face to the crusher, from the crusher to the storage bin and from the bin to the hauling equipment. Adequate arrangements should be made for avoiding fugitive emissions from quarry and crusher premises. This will include (i) housing the noise and dust producing units of the crusher unit in a building with wall of minimum 23 cm thickness and with suitable roofing, (ii) control of air pollution through provision of in-built dust extraction systems in the crusher unit and all transfer points, (iii) a chimney of appropriate height for the DG set (as specified by SPCB), (iv) water sprinkling facilities for the camp premises, (v) facilities to store water required for 3 days use. Consent to operate the crusher unit should be obtained from SPCB under Air (Prevention and Control of Pollution) Act, 1981 before starting the operation. (iii) Safety aspects: Blasting timings in quarry should be fixed avoiding the rush hours and these timings should be adhered to in order to avoid the conflict between the surrounding communities or population. Provide warning sirens 10 before each explosion as a warning alarm to people in and outside the quarry. Damaged explosives must be disposed off in a safe manner away from the operational area. Speed of the vehicles around the quarry should be restricted to a low speed in order to reduce the noise pollution and dust generation. Workers should not be exposed to sound of more than 85 – 90 DB for more than eight hours a day and shall be provided with adequate safety wears and personal protective equipments like ear muffs / plugs etc as detailed out in EMP. Fire extinguishers should be provided in the site office. Traffic movements should be restricted along the access road around times that children walk to and from school. Proper first aid facilities should be provided within the site office and in case of an accident, quick access to nearby hospital /clinic should be provided. Wilbur Smith Associates Pvt. Ltd. A.13 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures (iv) Facilities for workers: Potable drinking water should be provided in the site office in a hygienic environment sufficient for all the people. Adequate no. of toilets shall be provided for the workers with adequate water supply, proper drainage and effluent treatment system like septic tank with soak pit. Soak pit should have a sealed bottom, honey comb wall and 75 cm. thick, 2mm sand envelope around that. The sewage system for the camp must be properly sited, designed, built and operated so that no health hazard occurs and no pollution to the air, ground or adjacent watercourses takes place. (v) Waste Disposal: The Contractor should provide separate garbage bins for biodegradable, non- biodegradable and hazardous wastes in the camps and ensure that these are regularly emptied and disposed off in a hygienic manner. No incineration or burning of wastes shall be carried out by the Contractor . The disposal of any biodegradable matter shall be carried out in pits covered with a layer of earth within the camp site. Discarded plastic bags, paper and paper products, bottles, packaging material, gunny bags, hessian, metal containers, strips and scraps of metal, PVC pipe scrubber and poly urethane foam, auto mobile spares, tubes, tires, belts, filters, waste oil, drums and other such materials shall be either reused or sold /given out for recycling. POL (petroleum, oil and lubricants) waste shall be disposed off by transfer only to recycler/ re-refiners possessing valid authorization from the State Pollution Control Board and valid registration from the Central Pollution Control Board. Used lead batteries, if any, should be disposed as per the Batteries (Management and Handling) Rules 2001. Quarry areas should be protected from illegal dumping of waste by third parties. The overburden should be kept as minimum to maximize the commercial efficiency of the quarry, it can be utilized for creating earth bunds to mitigate the noise and visual impacts and also for the site rehabilitation process. No quarry waste shall be dumped within a 100 m on either side of the road. The overburden should be reused or disposed properly. Site for overburden disposal should be planned within the quarry site or any other appropriate site. (vi) Training to workers: Workers shall be trained in smooth and safe operation of plants and equipments, their regular maintenance and various safety measures to be followed as well as about the need and importance for adherence to these measures. All the drivers should be trained about safe driving and should be made aware about the need to observe caution while plying through access roads, especially during the time when children walk to and from school. Conduct education programs with the locals regarding the potential impacts of blasting, blasting warning systems, schedules etc. (vii) Information dissemination: There should be a sign board of size 6’ x 4’ mentioning the project details and Contractor ’s details to disseminate the information to the public. There should be a second sign board displaying the latest air and noise monitoring date and data against the standards specified. Warning sign boards should be set up at the entrance gate for the public as well as at other required places for the workers to alert them about the nature of operation being undertaken. Other mitigation measures: The quarry should not damage any building, work, property or rights of other persons. The quarry should not alter any right of way, well or tank. Roads inside the crusher premises should be tarred or concreted. Water course, if any, from a higher slope should be properly drained out. Strom water drainage shall be provided to prevent water logging and flooding in and around the area. The possibility of collecting the storm water in a pit or a tank should be explored so that it can be reused for dust suppression and the dependence on other water sources could be reduced. If this is not possible, the water should be safely channeled out of the quarry without disturbing any nearby human settlement. A register should be provided in the camp site for public to record their grievances if any. Environmental monitoring should be conducted as per suggested frequency. Wilbur Smith Associates Pvt. Ltd. A.14 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures The concerned authority – CSC/ PIU should regularly review the environmental, health and safety aspects. If any adverse effect on environment, habitat and concern of safety is noticed, appropriate measures should be taken as suggested by CSC or should arrange an alternative for road construction materials. In the case of existing quarries and additional quarries, the Contractor has to ensure that all actions in these quarries are in compliance with EMP. E. OPERATION OF QUARRY SITE AND STONE CRUSHING UNIT No quarrying operation shall be done without the approval from the concerned authority. The equipment used in quarry should be wear faced, which extends the equipment life and reduce the demand for spare parts. Adopt controlled blasting techniques and conduct quarrying in a skillful, scientific and systematic manner. All units should operate only between 6 am and 10 pm. or as specified by SPCB in the consent letter. Accessory facilities to be provided in the quarry includes sprinklers to spray water for dousing the dust generation, noise suppressers and rubberized mounting to reduce noise and vibration and tarpaulins or covers over material transporting vehicles. Provide sufficient water storage facility for 2 days’ use. Measures have to be taken to reduce the dust generation during drilling operation. Deep wetting of drilling zones also to be done by water sprinkling and drilling machine shall be fitted with dust suppression, collection and disposal arrangements. In case of blasting, the storage and the operation should be as per the regulations. To avoid spillage of fuel and lubricants, the vehicles and equipment should be properly maintained and repaired. Maintenance should be carried out on impervious platforms with spill collection provisions. Following conditions regarding sound generation should be complied with in a quarry / crusher unit:  The sound level (Leq) measured at a distance of 1 m from the boundary of the site shall not exceed 55 dB(A) during day time (6am - 6pm) and 45 dB(A) during night time (6 pm - 6am).  The DG set shall be provided with exhaust muffler /acoustic enclosure/acoustic treatment with an insertion loss of minimum 25 dB(A) and its emission levels should be within relevant SPCB guidelines.  A proper, routine and preventive maintenance procedure for the DG set shall be set and followed in consultation with the DG set manufacturer. F. PREPARATION OF QUARRY MANAGEMENT AND REDEVELOPMENT PLAN The Contractor after getting approval from the competitive authority for the selected site should submit a detailed Quarry Management Plan comprising the following details:  Section–1: Details of site: Copy of approved site identification report along with location plan on a village map or an FMB, showing the site, its survey no., access road, project stretch, distance form the project stretch, surrounding features and land use like residences, agricultural land, water bodies etc., photograph of the site showing the topography and other existing features.  Section-2: Site preparation: Activities that should be undertaken for preparing the site based on EMP and this guideline.  Section-3: Arrangements/ facilities within the camp: List of facilities to be set up within the site like site office, store room, rest room, sanitation facilities etc. and a layout plan showing all Wilbur Smith Associates Pvt. Ltd. A.15 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures these details along with vehicular movement path, green belt, locations were digging of contour trenches should be undertaken etc.  Section-4: Mitigation measures that will be undertaken as per the EMP and this guideline while setting up of the camp and operation of the camp should be separately listed out.  Sectoin-5: Other details: Any other relevant detail like list of awareness camps to be provided to workers, details of information dissemination etc. date of quarry licence obtained from Dept of Mines, its validity, additional conditions laid down in it etc. should be included in the quarry management plan. Species wise no. of trees to be cut and the details of top soil to be removed and conserved like quantity, location of storing etc. shall also be provided.  Section 6: Re-development plan: which should indicate following points: (i) List of structures to be demolished and list of the clean up activities that needs to be undertaken, (ii) Proposed use of the land in the post construction phase, if it is a public property, (iii) Presence of existing facilities that could be put in use by the land owner if it is a leased out private land or by the community in case of a public property.  Section-7: Annexure-(a) Working drawings: Electrical plan showing the electrical network planned for the site, location of generators, master switch boards etc. (b) Copy of permissions obtained from local governing body / community etc. as applicable, (c) Copy of agreement entered with site owner, in case of leased out sites. All the drawings should have north direction marked in it along with prevailing wind direction. Necessary dimensions and specifications should be provided where ever necessary. The quarry and crusher unit management plan should be submitted to the CSC for a written approval before any physical work (includes storage of materials, equipment etc.) is undertaken on a particular site. The CSC will carefully examine the proposals in light of the various EMP and regulatory provisions and provide suggestions, as necessary to the Contractor who will implement it within the stipulated time period. Contractor needs to prepare this document for each different site identified and CSC shall undertake a thorough analysis of the said management and redevelopment plan through a site investigation and suggest additional mitigation measures depending on the site and as demanded by the features of the specific site. G. REDEVELOPMENT OF QUARRY AREA The main objective of the redevelopment of quarries is to make the area a safe and secure place and adapt it to a suitable land use like leisure place or fishing place etc. which is suitable for the physical environment as well as for the community around. Along with the preparation of quarry and crusher management plan the Contractor should also prepare a re-development plan, which will be submitted for approval to CSC who in turn will be responsible for approving and monitoring these plans. The redevelopment plan should indicate following points:  List of structures to be demolished and list of the clean up activities that needs to be undertaken.  Presence of existing facilities that could be put in use by the land owner if it is a leased out private land or community in case of a public property.  The proposed use of the quarry site with a layout plan showing the proposed facilities / improvement measures, list of local plant species that could be planted etc. Wilbur Smith Associates Pvt. Ltd. A.16 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures  Photographs of the site before, during and after the quarrying process. Possible re-development options include the following:  Re-vegetation of the quarry to merge with surrounding landscape with reuse of top soil mixed together with farm yard manure.  Development of exhausted quarries as water bodies, where the quarry pit is developed into pond or a rainwater harvesting structure.  Pits created as a result of blasting could be filled with over burden which are removed and stockpiled in other areas or with construction debris. Top soil should be spread back and trees should be planted along the boundary. Tree plantation where ever possible depending on the proposed use, erosion control measures etc should be taken up as part of the redevelopment plan. The Contractor should clear all temporary structures; dispose all debris, garbage, night soils and any other waste as per the approved debris management plan. All disposal pits or trenches should be filled in, disinfected and effectively sealed off. Residual topsoil, if any will be distributed or spread evenly in plantation sites, on adjoining/near-by barren land or affected agricultural land adjacent to the RoW that has been impacted on account of any accidental spillage. Entire camp area should be left clean and tidy, in a manner keeping the adjacent lands neat and clear, at the Contractor ’s expense, to the entire satisfaction of land owner and the CSC. These activities should be completed by the Contractor prior to demobilization. Once the Contractor finishes his job, he needs to obtain a certificate from the owner, stating that the site has been re- developed to his/her satisfaction and in tune with the agreement. Then following documents needs to be submitted to the CSC by the Contractor :  Copy of approved site identification report  Photographs of the concerned site ‘before’ and ‘after’ setting up the camp.  Certificate from the owner stating his/her satisfaction about status of re-development of the site, this is applicable only in the case of a site to be returned to the owner. IE shall ensure, through site verification that all clean-up and restoration operations are completed satisfactorily and a written approval should be given to the Contractor mentioning the same before the ‘works completion’ certificate is issued/recommended. The PMT shall ensure through site inspection that the Contractor and CSC have complied with all these provisions. The site can then be handed over to the concerned owner or local bodies or for local communities as the case may be. Certification/documentation pertaining to approval for clean-up and restoration operations and thereafter handing-over to the owner shall be properly maintained by the Contractor , Supervision Consultant and PMT. Wilbur Smith Associates Pvt. Ltd. A.17 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 4. Guidelines for Siting, Management and Redevelopment of Borrow Areas A. BORROW AREA SELECTION A borrow describes an area where material (usually soil or sand) has been dug for use at another location, for example, soil might be excavated to fill an embankment for a highway. In some cases, the borrow pits may become filled with ground water posing a danger to the surrounding community. If properly redeveloped, it can be turned into recreational areas or sustainable wildlife habitats. In other cases, borrow pits may be used for landfill and waste disposal also. B. CRITERIA FOR SITE SELECTION The Contractor in addition to the established practices, rules and regulation shall also use the following criteria before finalizing the locations of borrow areas:  The borrow area should not be located in agriculture areas especially in paddy fields unless unavoidable i.e. barren land is not available. In case borrowing needs to be done on an agricultural land, top-soil stripping, stacking and preservation is a must.  Borrow pits shall not be located within a distance of 100 mts. from any NH, SH or other roads.  Site shall be located 30m away from toe of the embankment along road side.  Site should be located not less than 30m from the toe of the bank along the river side or irrigation tank bund.  Borrow area shall be located at a minimum distance of 30m from the toe of the irrigation tank bund.  Borrow site shall be located at a minimum distance of 500 m in down-wind direction of villages and settlements.  No borrow pits shall be located within 250 m. from schools, colleges, playgrounds, religious structures and health centers.  No borrow area shall be opened within 500 m. from a reserved or protected forest area/sites, wildlife movement zone and cultural heritage site.  Loss of vegetation shall be almost nil or minimum.  Borrow area near any surface water body will be at least 100mts. away from the toe of the bank or high flood level, whichever is maximum. After identification of borrow area location/s, the Contractor will fill the prescribed reporting format and submit the same for approval to the “Site Engineer� at least 7 working days before commencement of earth works. A written approval from CSC shall be necessary before any activity/work is commenced.  Borrow pit location shall be located at least 0.8 km from villages and settlements. If unavoidable, they should not be dug for more than 30 cm and should be drained. C. Finalization of the selected area After identification of the site, the Contractor should fill up the prescribed reporting format provided in EMAP and submit the same for approval to the CSC. The selected site/s shall be approved by Wilbur Smith Associates Pvt. Ltd. A.18 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Environmental Officer of CSC, after considering the compliance with the EMP clauses. No agreements or payments shall be made to the land owner/s (in case of a leased or rented out land) prior to receipt of a written approval from the CSC. Any consequence of rejection prior to the approval shall be the responsibility of the Contractor and shall be made good at his own cost. After obtaining a written approval from the CSC for the selected site, the Contractor has to enter into an agreement with the land owner to obtain his/her consent before commencing any operation / activities in the land. The agreement should also mention its type, duration, amount and mode of payment as well as the preferences of the owner regarding site maintenance and redevelopment. D. BORROW AREA MANAGEMENT  Before the start of operations, the area to be borrowed shall be marked by the Contractor with wooden or stone pegs to ensure that the land required for slope stabilization or bund creation is maintained. Supervision Consultant has to ensure that this marking is done on the ground to avoid issues at a later date. Any disregard of this condition shall be made good at the Contractor ’s and/or consultant’s own expense.  After receiving the approval, the Contractor will begin operations keeping in mind the following points.  Top soil conservation is to be undertaken only if its reuse is envisaged for the proposed activity in the borrow area rehabilitation. Top soil that cannot be re-used in rehabilitation of borrow areas shall be used in the plantation belt/zone along the road.  Damage to productive and fertile areas has to be minimum. This includes appropriate planning of haul roads.  No excavated acceptable material other than surplus to requirements of the Contract shall be removed from the site. Contractor should be permitted to remove acceptable material form the site to suit his operational procedure, and then be shall make good any consequent deficit of material arising there from.  Where the excavation reveals a combination of acceptable and un-acceptable materials, the Contractor shall, unless otherwise agreed by the Engineer, carryout the excavation in such a manner that the acceptable materials are excavated separately for use in the permanent works without contamination by the un-acceptable materials. The acceptable material shall be stockpiled separately.  The Contractor shall ensure that he does not adversely affect the stability of excavation or fills by the methods of stockpiling materials, use of plants or siting of temporary buildings or structures.  The following principles shall be adhered to during borrow area operations:  A 15 cm topsoil layer will be stripped off from the borrow pit and this will be preserved in stockpiles in a designated area with a height not exceeding 2m and side slopes not steeper than 1:2 (Vertical: Horizontal).  Borrowing of earth will be allowed up to a depth of 1.5 mtr from the existing ground level only. Wilbur Smith Associates Pvt. Ltd. A.19 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures  Ridges of not less than 8m width will be left at intervals not exceeding 300m.Small drains will be cut through the ridges, if necessary, to facilitate drainage.  The slope of the edges will be maintained not steeper than 1:4 (vertical: Horizontal).  Rehabilitation shall be satisfactorily undertaken immediately after the use has ceased and at least three weeks prior to monsoon.  If the rehabilitation plan envisages re-use of top soil, then preserved top soil has to be spread uniformly over the land used as a borrow area.  Bunds and temporary fencing (using barbed wire) along with plantation should be provided in case the borrow area is developed as a pond to ensure safety of the residents and the cattle. However, the depth shall not exceed 1.5 m. E. Preparation of Borrow Area Management and Redevelopment Plan The Contractor after getting approval from the competitive authority for the selected site should submit a detailed Borrow Area Management and Redevelopment Plan comprising the following details:  Section–1: Details of site: Copy of approved site identification report along with location plan on a village map or an FMB, showing the site, its survey no., access road, project stretch, distance form the project stretch, surrounding features and land use like residences, agricultural land, water bodies etc., photograph of the site showing the topography and other existing features.  Section-2: Site preparation: Activities that should be undertaken for preparing the site based on EMP and this guideline.  Section-3: Layout plan: A layout plan showing all these details along with vehicular movement path, green belt, locations were digging of contour trenches should be undertaken etc.  Section-4: Mitigation measures that will be undertaken as per the EMP and this guideline while setting up of the camp and operation of the camp should be separately listed out.  Sectoin-5: Other details: Any other relevant detail like list of awareness camps to be provided to workers, details of information dissemination etc. date of quarry licence obtained from Dept of Mines, its validity, additional conditions laid down in it etc. should be included in the quarry management plan. Species wise no. of trees to be cut and the details of top soil to be removed and conserved like quantity, location of storing etc. shall also be provided.  Section 6: Re-development plan: which should indicate following points: (i)proposed use of the land in the post construction phase, (ii) preferences of land owner with respect to redevelopment, (iii) Presence of existing facilities that could be put in use by the land owner if it is a leased out private land or by the community in case of a public property, (iv) Extent of community involvement.  Section-7: Annexure-(a) Copy of permissions obtained from local governing body / community etc. as applicable, (b) Copy of agreement entered with site owner, in case of leased out sites. All the drawings should have north direction marked in it along with prevailing wind direction. Necessary dimensions and specifications should be provided where ever necessary. The management Wilbur Smith Associates Pvt. Ltd. A.20 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures plan should be submitted to the CSC for a written approval before any physical work (includes storage of materials, equipment etc.) is undertaken on a particular site. The CSC will carefully examine the proposals in light of the various EMP and regulatory provisions and provide suggestions, as necessary to the Contractor who will implement it within the stipulated time period. Contractor needs to prepare this document for each different site identified and CSC shall undertake a thorough analysis of the said management and redevelopment plan through a site investigation and suggest additional mitigation measures as demanded by the features of the specific site and its surroundings. F. REHABILITATION OR RE-DEVELOPMENT OF BORROW AREAS The objective of the borrow area rehabilitation is to return the borrowing sites to a safe and environmentally sound condition. The concept entails enhancing benefits (including those linked to livelihood) for the community and individuals. Top soil preservation (and its re-use) and proper stabilization of slopes are the fundamental requirements of the rehabilitation process. Re-development plan shall be prepared and submitted along with reporting format by the Contractor before the borrowing operation is permitted by the CSC. The redevelopment is to be prepared in consultation with land owner/s (whether public, private or institutional) and by within the environmental and safety requirements of the EMP. Some key points on borrow area rehabilitation are presented in the table provided below. However, the Contractor is free to prepare other rehabilitation scheme/s subject to the approval by the Environmental Officer of the Supervision Consultant Type/Form Of Rehabilitation Reuse of Actions Required For Rehabilitation Top Soil Farm land Yes Leveling Slope Stabilization along the edges if there is a level difference Ponds including creation of new No Slope Stabilization (angle/benching) ones and enhancing capacity of Access / Approach Ramp existing ones (for irrigation; Bund creation and Temporary Fencing pissiculture and general uses by Plantation in the periphery people and/or cattle) Water recharging No Slope Stabilization areas/percolation tanks (depth up Small bund creation to one meter) Leveled lands that can be Generally Leveling developed later for various uses No Top soil re-use depends on the type of (such as residential areas, parking developmental work envisaged lots, community grounds etc.) Construction waste disposal sites No Depression after filling-in of wastes to be (for non-toxic/non-hazardous leveled-up wastes) (reinstated with top-soil Top soil re-use depends on the type of with plantation over the developmental work envisaged rehabilitated site) Plantation Zones Yes Leveling Selection of Species as per OSRP Project Guidelines Water holes for animals and birds No Gentle Slopes on all sides (outside forest and protected Plantation in the periphery areas) Depth upto 1.5 m. Wilbur Smith Associates Pvt. Ltd. A.21 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Rehabilitation works shall be undertaken immediately upon the exhaustion of the approved quantity and shall not be delayed. The Supervision Consultant shall take appropriate action in case delays are observed. These activities should be completed by the Contractor prior to demobilization. Once the Contractor finishes his job, he needs to obtain a certificate from the owner, stating that the site has been re- developed to his/her satisfaction and in tune with the agreement. Then following documents needs to be submitted to the CSC by the Contractor :  Copy of approved site identification report  Photographs of the concerned site ‘before’ and ‘after’ setting up the camp.  Certificate from the owner stating his/her satisfaction about status of re-development of the site. IE shall ensure, through site verification that all clean-up and restoration operations are completed satisfactorily and a written approval should be given to the Contractor mentioning the same before the ‘works completion’ certificate is issued/recommended. The PMT shall ensure through site inspection that the Contractor and CSC have complied with all these provisions. The site can then be handed over to the concerned owner or local bodies or for local communities as the case may be. Certification/documentation pertaining to approval for clean-up and restoration operations and thereafter handing-over to the owner shall be properly maintained by the Contractor , Supervision Consultant and PMT. Wilbur Smith Associates Pvt. Ltd. A.22 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 5. Guidelines for Siting and Management of Debris Disposal Site A. OVERVIEW Construction of highways generates huge quantity of building debris, which needs to be disposed off in previously identified sites suitable for such an activity. This process entails close scrutiny of the sites with respect to their location and this section details out the criteria to be followed in doing so. Moreover, it also guides the Contractor as to how to prepare the site without causing much impact on the surrounding environment. B. CRITERIA FOR LOCATING THE SITE/S The locations of waste disposal have to be selected such that:  The said site shall be selected preferably from barren, infertile lands. In case agricultural land needs to be selected, top-soil stripping, stacking and preservation should be undertaken prior to initiation of any activities.  Debris disposal site shall be at least 200 m away from surface water bodies3.  No residential areas shall be located within 100 m downwind side of the site.  The site is minimum 250 m. away from sensitive locations like settlements, ponds/lakes or other water bodies, wetlands, protected areas, forests, wildlife habitats / Mangroves / Ecologically sensitive areas, seasonal streams, rivers, canals, flood plains, educational institutions, medical centers, religious sites, cultural or heritage sites and play grounds.  The local governing body and community shall be consulted while selecting the site.  The selected site shall meet with the local regulatory requirements (including those of SPCB, Municipalities etc.).  The site shall preferably be owned by government so that there is no need to acquire the land for the same. After identification of the site the Contractor should fill up the prescribed reporting format and submit the same for approval to the CSC. Any activity on the site can be initiated only after obtaining permission form the CSC. C. FINALIZATION OF SELECTED SITE/S The selected site/s shall be approved by CSC and PMT, after considering compliance with the EMP clauses and this guideline. No agreements or payments shall be made to the land owner/s prior to 3 In the absence of site meeting the stipulated criteria, an alternate site can be selected specifying the reasons. In such a case, the construction camp management plan should incorporate additional measures specific to the site as suggested by the CSC. Wilbur Smith Associates Pvt. Ltd. A.23 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures receipt of a written approval from the CSC and PMT. Any consequence of rejection prior to the approval shall be the responsibility of the Contractor and shall be made good at his own cost. D SETTING UP OF DEBRIS DISPOSAL SITE Following steps has to be undertaken while setting up a debris disposal site:  Top soil conservation has to be undertaken as per the guidelines given in EMP.  Considering the topography of the site contour trenches as detailed in EMP should be made along the site boundary to prevent soil erosion.  Fencing should be provided for the debris disposal site to prevent trespassing of humans and animals into the area as well as to prevent spread of the waste material through action of wind, water, scavengers or rag pickers.  No of trees cut should be recorded and three times the same should be planted as green belt development or elsewhere as part of the project.  Provide proper drainage facility so that the run off from the site doesn’t contaminate any near by water sources or rivers. E PREPARATION OF DEBRIS DISPOSAL SITE MANAGEMENT AND REDEVELOPMENT PLAN The Contractor after getting approval from the competitive authority for the selected site should submit a detailed Debris Disposal Site Management and Redevelopment Plan comprising the following details:  Section–1: Details of site: Copy of approved site identification report along with location plan on a village map or an FMB, showing the site, its survey no., access road, project stretch, distance form the project stretch, surrounding features and land use like residences, agricultural land, water bodies etc., photograph of the site showing the topography and other existing features.  Section-2: Site preparation: Activities that should be undertaken for preparing the site based on EMP and this guideline.  Section-3: Arrangements within the site: A layout plan showing the existing trees, green belt, locations were contour trenches should be dug etc.  Section-4: Mitigation measures that will be undertaken as per the EMP while preparing the site and dumping the waste should be separately listed out.  Sectoin-5: Other details: Any other relevant details like copy of approvals / clearances obtained, species wise no. of trees to be cut and the details of top soil to be removed and conserved like quantity, location of storing etc. shall also be provided.  Section 6: Re-development plan: which should indicate following points: (i) species wise no of tree to be planted, (ii) Proposed use of the land in the post construction phase, if it is a public property, (iii) Presence of existing facilities that could be put in use by the land owner if it is a leased out private land or by the community in case of a public property and (iv) Other site specific mitigation measures to be undertaken as recommended by the CSC. Wilbur Smith Associates Pvt. Ltd. A.24 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures  Section-7: Annexure-(a) Copy of permissions obtained from local governing body / community etc. as applicable, (c) Copy of agreement entered with site owner, in case of leased out sites. All the drawings should have north direction marked in it along with prevailing wind direction. Necessary dimensions and specifications should be provided where ever necessary. The debris site management plan should be submitted to the CSC for a written approval before any physical work is undertaken. The CSC will carefully examine the proposals in light of the various EMP and regulatory provisions and provide suggestions, as necessary to the Contractor who will implement it within the stipulated time period. Contractor needs to prepare this document for each different site identified and CSC shall undertake a thorough analysis of the said management and redevelopment plan through a site investigation and suggest additional mitigation measures as demanded by the features of the specific site and its surroundings. F. REDEVELOPMENT OF WASTE DISPOSAL SITES Along with the format seeking permission/approval for the disposal site/location from the Engineer/Supervision Consultant, the Contractor shall also submit a rehabilitation plan for the area. Following points have to be kept in view while undertaking the rehabilitation measure:  The dump sites shall be suitably rehabilitated by planting local species of shrubs and other plants. The species (region specific) shall be chosen from the list suggested in the EA/EMP. Local species of trees should be selected so that the landscape is coherent and is in harmony with the surrounding environment.  Rehabilitation can also include conversion into farm land, playground, parking area, block plantation area etc.  Some of the dumpsites could be used either for plantation or for growing agricultural products such as ginger, turmeric or oranges etc.  Care should always be taken to maintain the hydrological flow in the area. Wilbur Smith Associates Pvt. Ltd. A.25 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 6. Guidelines for Preparing Comprehensive Waste Management Plan A. OVERVIEW A comprehensive waste management plan shall be prepared by the Contractor prior to initiation of any works. The purpose of the plan is to provide standardized procedures for the clearance, removal and disposal of debris caused by major debris / waste generated during the construction work as well as to establish the most efficient and cost effective methods to resolve debris disposal issues. B. PREPARATION OF COMPREHENSIVE WASTE MANAGEMENT PLAN The Contractor should prepare a Comprehensive Waste Management Plan to be submitted to CSC for approval prior to setting up of construction and labour camp and it should comprise the following details:  Categorization of waste into degradable, biodegradable and hazardous categories and list of different types of waste that falls in each of these categories.  Estimates about the quantity of waste generated in each category and type of storage units required.  Detail the provisions for storage and handling of waste until disposed. A plan of the respective camps / areas like construction camp, labour camp etc. to be attached indicating in it the space allocated for storage and handling of wastes.  Detail the precautions to be taken while storing, handling and disposing each type of waste, trainings to be imparted to workers to create awareness about waste management.  Details of each debris disposal site: Copy of approved site identification report along with location plan on a village map or an FMB, showing the debris disposal sites, site, its survey no., access road, project stretch, distance form the project stretch, surrounding features and land use like residences, agricultural land, water bodies etc., photograph of the site showing the topography and other existing features. C. TRAINING FOR PROJECT STAFF AND WORKERS All staff and workers involved in the highway construction should be imparted training about comprehensive waste management plan including the need for such a plan, its components and measures adopted by the Contractor for implementing it. In addition, all personnel involved should be made aware about various steps and measures each of them has to follow so as to ensure the compliance to the comprehensive waste management plan. D. PRECAUTIONS TO BE ADOPTED DURING DISPOSAL OF DEBRIS/WASTE MATERIAL The Contractor shall take the following precautions during transportation and disposal of debris/waste material:  A register should be kept for recording the details of the waste generated and their disposal.  The pre-designated disposal sites should be a part of Comprehensive Solid Waste Management Plan and should be identified as per the EMP clauses prior to initiation of any work on a particular section of the road. Wilbur Smith Associates Pvt. Ltd. A.26 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures  The Contractor will take full care to ensure that public or private properties are not damaged/ affected during the site clearance for disposal of debris and the traffic is not interrupted.  All arrangements for transportation during dismantling and clearing debris, considered incidental to the work, will be implemented by the Contractor in a planned manner as approved and directed by the CSC.  In the event of any accidental spill or spread of wastes onto adjacent parcels of land, the Contractor will immediately remove all such waste material/s and restore the affected area to its original state to the satisfaction of CSC.  Contractor should ensure that any spoils/materials unsuitable for embankment fill shall not be disposed off near any water course; water body; agricultural land; natural habitats like grass lands, wet lands, flood plains, forests etc. pasture; eroded slopes; and in ditches, which may pollute the surrounding including water sources.  Contractor should ensure effective water sprinkling during the handling and transportation of materials where dust is likely to be created.  Materials having the potential to produce dust will not be loaded beyond the side and tail board level and will be covered with a tarpaulin in good condition.  Any diversion required for traffic during disposal of debris shall be provided with traffic control signals and barriers after discussion with the local body and as approved by CSC.  During the debris disposal, Contractor will take care of surrounding features and avoid any damage to trees and properties.  Surplus fly ash, bottom ash and lime, if any, transported for use on this corridor shall not be left open and dumped at any disposal site. Contractor shall take care of such residual materials for use at any other location/s of new embankment construction wok with proper protection measures  No hazardous and contagious waste material shall be disposed at such locations. E. WASTE DISPOSAL IN CONSTRUCTION CAMP  Concrete flooring and oil interceptors should be provided for hot mix plant area, workshops, vehicle washing and fuel handling area.  POL (petroleum, oil and lubricants) waste shall be stored safely in separate containers and should be disposed off by transfer only to recycler/ re-refiners possessing valid authorization from the State Pollution Control Board and valid registration from the Central Pollution Control Board.  Used lead batteries, if any, should be disposed as per the Batteries (Management and Handling) Rules 2001.  Water separated and collected from oil interceptor should be reused for dust suppression.  There should be a register to record the details of the oil wastes generated at the workshops and oil storage areas. Wilbur Smith Associates Pvt. Ltd. A.27 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures  The Contractor will provide separate garbage bins in the camps and ensure that these are regularly emptied and disposed off in safe and scientific manner as per the Comprehensive Solid Waste Management Plans approved by the CSC.  No incineration or burning of wastes shall be carried out.  Discarded plastic bags, paper and paper products, bottles, packaging material, gunny bags, hessian, metal containers, strips and scraps of metal, PVC pipes, rubber and poly urethane foam, auto mobile spares, tubes, tires, belts, filters, waste oil, drums and other such materials shall be either reused or will be sold /given out for recycling.  Septic tank must be provided for toilets and the sludge should be cleared by municipal exhausters. F. WASTE DISPOSAL IN LABOUR CAMP  The Contractor should provide separate garbage bins in the camps for bio-degradable, non- degradable and domestic hazardous waste and ensure that these are regularly emptied and disposed off in safe and scientific manner.  The disposal of kitchen waste and other biodegradable matter shall be carried out in pits covered with a layer of earth within the camp site to avoid smell and pests. The Contractor may use the compost from such wastes as manure in the plantation sites.  Noon-biodegradable waste like discarded plastic bags, paper and paper products, bottles, packaging material, gunny bags, hessian, metal containers, strips and scraps of metal, PVC pipes, rubber and poly urethane foam, auto mobile spares, tubes, tires, belts, filters, waste oil, drums and other such materials shall be either reused or should be sold /given out for recycling.  No incineration or burning of wastes should be carried out.  Effluent treatment system like septic tank with soak pits provided for toilets should be sited, designed, built and operated in such a way that no health hazard occurs and no pollution to the air, ground or adjacent watercourses takes place.  Soak pits must be provided to collect waste water from bathrooms and kitchen. G. DISPOSAL OF BITUMINOUS WASTE  The bituminous waste should be used for development of roads inside the construction camps, haul roads or for filling pot holes in rural roads.  At locations identified for disposal of residual bituminous wastes, the disposal will be carried out over a 60 mm thick layer of rammed clay so as to eliminate the possibility of leaching of wastes into the ground water.  The Contractor will suitably dispose off unutilized non-toxic debris either through filling up of borrows areas located in wasteland or at pre-designated disposal sites, subject to the approval of CSC. Wilbur Smith Associates Pvt. Ltd. A.28 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures  Debris generated from pile driving or other construction activities along the rivers and streams drainage channels shall be carefully disposed in such a manner that it does not flow into the surface water bodies or form puddles in the area. H. DISPOSAL OF NON BITUMINOUS WASTE  Non-bituminous wastes other than fly ash may be dumped in borrow pits (preferably located in barren lands) where such borrow pits are not suitable to be re-developed as an economic source like pisci-culture or a source of irrigation. Such borrow pits can be filled up with non-bitumen wastes and then covered with a minimum 30cm layer of the soil, where plantation of trees and shrubs will be taken-up by the Contractor as a part of site rehabilitation.  Local tree species suitable for such re-habitation work shall be selected in consultation with local community. I. REUSE OF DEBRIS GENERATED FROM DISMANTLING STRUCTURES AND ROAD SURFACE Debris generated due to the dismantling of existing road will be suitably reused in the proposed construction as follows  Eighty percent (80%) of the sub-grade excavated from the existing road surface, excluding the scarified layer of bitumen, shall be reused in the civil works after improving the soil below the subgrade through addition of sand and suitable cementing material for qualitative up-gradation.  The dismantled scraps of bitumen will be utilized for the paving of cross roads, access roads and paving works in construction sites and campus, temporary traffic diversions, haulage routes, parking areas along the corridor or in any other manner approved by the Environmental Officer of CSC. Wilbur Smith Associates Pvt. Ltd. A.29 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 7. Guidelines for Top Soil Conservation and Reuse The top soil from all sites including road side widening and working area, cutting areas, quarry sites, construction camps, labour camps, haul roads in agricultural fields (if any) and areas to be permanently covered shall be stripped to a specified depth of 15 cm and stored in stock piles for reuse. A portion of temporarily acquired area and/or RoW edges will be earmarked for storing top soil. The locations for stacking will be pre-identified in consultation and with approval of environmental officer of CSC. The following precautionary measures will be taken by the Contractor to preserve the stock piles till they are re-used: Stockpiles will be such that the slope doesn’t exceed 1:2 (vertical to horizontal), and height is restricted to 2 m.  To retain soil and allow percolation of water, the edges of pile will be protected by silt fencing.  Multiple handling kept to a minimum to ensure that no compaction occurs.  Such stockpiles shall be covered with empty gunny bags or will be planted with grasses to prevent the loss during rains. Such stockpiled topsoil will be utilized for:  Covering reclamation sites or other disturbed areas including quarry areas.  Top dressing and raising turfs in embankment slopes  Filling up of tree pits  For developing compensatory afforestation plantation  In the agricultural fields of farmers, acquired temporarily that needs to be restored. Residual top soil, if there is any, shall be utilized for the plantations works along the road corridor. The utilization as far as possible shall be in the same area from where top soil was removed. The stripping, preservation and reuse shall be carefully inspected, closely supervised and properly recorded by the CSC. Wilbur Smith Associates Pvt. Ltd. A.30 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 8. Guidelines for Provision of Noise Barriers Mitigating the impact of increased noise levels at the sensitive receptor locations includes posting of signs prohibiting the use of horns, constructing a sound insulating wall and, to the extent possible, planting appropriate trees to serve as green noise barriers. Attenuation of sound can be achieved considerably by the combined effect of sound insulating walls and green barriers. Nevertheless the putting of green barriers requires at least 2-5m additional space between the solid barrier and the receptor. Principle of the designed barrier is explained in the design sections. Proposed project mitigation actions are cost effective when compared to the generally recommended expensive double glazed windows. A. SOUND INSULATING WALLS FOR SILENCE ZONES The design of a sound insulating wall comprises 23 cms. thick brick wall which will act as a sound barrier. The typical cross section for the same is given in Figure 1. This can be provided adjacent to the road corridor where hospitals, medical centre, schools and other educational institutions are affected by the traffic noise. B. GREEN BARRIERS FOR SILENCE ZONES These are simply a thick layer of green plantation with limited foliage (eg. Ashoka Tree) acting as noise absorbers. These trees may be planted just inside and adjacent to the wall. While Contractors will be responsible for the implementation of the civil work, tree plantation will be carried out by the Forest department under the tree-planting scheme of the project. The implementation aspects are provided in the EMP. In addition to the noise mitigation, the thick green layer will act as an air quality filter for traffic emission. A typical green barrier of 100m lengths will have 200 trees in 4 rows. Noise mitigation techniques will be employed as may be warranted at each of the sensitive receptor sites. Definitive noise levels will be empirically determined at each site and selection of the mitigation technique will be made on a site- specific basis in consultation with property owners. Co-ordination and implementation will be the responsibility of the Environmental officer of the Construction Supervision Consultant (CSC). Mitigation cost has been estimated as a part of the environmental costs of the project. Wilbur Smith Associates Pvt. Ltd. A.31 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures S O LID N O IS E B AR R IER Figure 1. Typical Cross Section of a Noise Barrier Wilbur Smith Associates Pvt. Ltd. A.32 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 9. Guidelines to Ensure Worker’s Safety During Construction In order to ensure worker’s safety while undertaking various operations / stages of construction many safety measures needs to be followed, which are listed down below: A. TREE FELLING  Use hard hats during tree felling  Ensure safe use and storage of tools such as axes, power chain saw, hand saw of different types, HDPE ropes of approved thickness to drag felled trees and logs.  Keep the saw blades in proper lubrication and sharpened state for efficient workability.  Determine proper foot and body position when using the implements for felling, cutting and dragging.  Wear appropriate foot protection  Avoid cutting branches overhead.  Keep first aid kits ready at the site.  Determine possible hazards in the area, e.g. electrical or telephone or other utility lines, buildings, vehicles and domestic cattle that may create unsafe work situations.  Prior to felling, determine the safest direction of fall and orient fixing of ropes and  Cutting positions accordingly.  Determine the proper hinge size before directing the fall.  Keep machineries and workers ready for speedy removal of the tree from the main traffic movement area.  Keep flag men and warning signal signage at either end of felling area to control movement of traffic and warn passers-by.  Use loud noise signals for warning by-standers and workmen about the impending fall, so as they move away from the direction of fall. B. PLANT SITES, CONSTRUCTION CAMP AND QUARRY AREAS  Install perimeter fencing.  Ensure good visibility and safe access at site entrances.  Provide adequate warning signs at the entrance and exit, as necessary.  Provide adequate space/area for loading and unloading, storage of materials, plant and machinery.  Display emergency procedure and statutory notices at conspicuous locations.  Provide areas for collecting garbage and other waste material, and also arrange for their regular/periodic disposal. Wilbur Smith Associates Pvt. Ltd. A.33 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures  Arrange appropriate storage, transportation and use of fuel, other flammable materials and explosives in line with the license requirements obtained from concerned authorities.  Provide defined access roads and movement areas within the site.  Ensure availability of first aid facilities and display notices at various work places showing the location of first aid facilities and emergency contact numbers. Provide and enforce use of PPE at plant and quarry sites. C. HOUSE KEEPING PRACTICES  Provide proper slope in kitchen, canteens, washrooms, toilets and bathrooms for easy and immediate draining of water.  Keep all walkways and circulation areas clear and unobstructed at all times.  Ensure that spillages of oil and grease are avoided and in case of accidental spills, these are immediately collected.  Use metal bins for collection of oily and greasy rags.  Stack raw materials and finished products out of walkways.  Do not leave tools on the floor or in any location where they can be easily dislodged.  Keep windows and light fittings clean.  Maintain the workplace floors dry and in a non-slippery condition  Provide and maintain proper drainage system to prevent water logging and unhygienic conditions.  Ensure that protruding nails in boards or walls are moved or bent over or removed so that they do not constitute a hazard to people.  Store all flammable materials in appropriate bins, racks or cabinets with proper cover and labels – as required for various products.  Make sure that hazardous/dangerous chemicals are kept in the goods stores with the appropriate labeling, display of the material-safety-data-sheet (MSDS) and other precautionary measures.  Display ‘no smoking’ signs in areas with high risks of fire, (eg. near fuelling areas, diesel/oils/lubricant/paint storage area, hessians, rubber, wood and plastic etc.) in and around working area. D. TRAFFIC SAFETY AND ROADS WORKS  Delineate advance warning zones, transition zones and construction zones at both ends of a work front. Use devices such as regulatory signs, delineators, barricades, cones, pavement markings, lanterns and traffic control lights, reflectors and signal men in appropriate manner round the clock. Wilbur Smith Associates Pvt. Ltd. A.34 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures  No work front should be ‘touched’ without putting appropriate safety measures in place. CSC will be responsible to ensure that the permission for any activity is not given without the required safety plan and practices in place.  Put signage at appropriate locations as per the road construction activity plan to warn the road users, construction vehicles/equipment operators, pedestrians and local residents about the work in progress, speed controls, hindrances/ blockages, diversions, depressions etc. in lines with contract requirements and IRC guidelines.  Express a regret signage for the inconvenience caused and alert about the dangers ahead on account of construction activity.  Signage has to be: (i) simple, easy-to-understand and should convey only one message at a time; (ii) has florescent and reflective properties of the paints; iii) broad, prominent and with appropriate size of letters and figures; (iv) placed at the appropriate ‘point/s’ as specified in the IRC guidelines to allow proper stoppage/reaction time to approaching vehicles.  Different sign boards shall have a mix of pictorial signs and messages in local language, Hindi and English.  While using barricades, ensure that traffic is kept away from work areas and the road user is guided to the safe, alternative movement track.  Ensure that excavation sites are provided with effective barriers and reflecting signage to prevent any accidental approach by vehicles during the day or night.  Prevent entry of cattle and wildlife through proper fencing/barricading around the excavation sites.  Provide proper uniform (light reflecting garments) to flagmen engaged in traffic control at diversions so that they can be singled out from the moving traffic.  Provide wide red and green flags or red and green lights to flagmen for controlling traffic.  In high traffic zones and congested areas, use of wireless communication devices with protective headgear and shoes by flagmen has to be ensured to prevent confusion and minimize the risk of accidents. E. SAFETY DURING EXCAVATION  The risk of accidents involving people and vehicles remains high in excavated sites. All pits or excavations shall to be barricaded to warn the road users and residents and to avoid any unauthorized entry of persons, children, domestic cattle or wildlife. For deep excavations and culvert construction sites, painted GI sheets, delineators, lamps (as required) and retro-reflective signage shall be used.  For excavation in soft loose & slushy soil (above 2.00 m depth where sliding of earth or collapsing of sides may occur)  Excavation more than 1.5 m. is to be done in steps of minimum 500 mm offsets with plank and stuttering support, as required under contract clauses. Wilbur Smith Associates Pvt. Ltd. A.35 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures  For excavation in slippery or water logged area (labour or machinery may slip or get caught in slush)  Try to dewater the area and spread minimum 150 mm thick sand layer to avoid slipping.  For excavation in rock where chiseling is involved (and hammer or stone pieces may fall and injure the hand, eyes or legs).  Only experienced and skilled labour should be employed. Chisel should be held with a tight fitting grip. Goggles and leg cover should be provided to protect the labour.  Excavation in rock where blasting is involved (risk of injury to workers and passer-by)  Blasting is to be carried out where absolutely necessary following all explosive handling regulations with mines safety principles including use of hooters, signage, protective gear, safety fuse, detonators, ignition coils and wires, exploder dynamo etc. The danger zone has to be vacated at least 20 minutes before the actual firing. Sufficient warning through positioning of red flags, dander signs, painted drums and sirens for safety of men at work and for any passer-by is to be provided. After a lapse of minimum 15 minutes when a clear signal is given by the site-in- charge through use of whistle or horn or light, the blasting charge should be ignited. After blasting a minimum of 30 minutes gap is to be given for the rocks and earth or blocks of loose boulders to fall of so that safety and security of the staff at the operation zone is ensured. Heavy charges shall not be used in fragile rock systems, where rock disintegrating machinery could be brought to use.  The entire operation shall be conducted under the strict supervision of qualified staff and in the presence of safety officers.  For excavation for drain or manhole (risk of a passer-by falling into the excavated portion).  The area should be properly barricaded with sign boards and illumination/lamps for night time safety. In congested stretches, watchmen/guards can also be placed for vigil.  Snake bites or Scorpion Stings during excavation  In areas with vegetation, tall grasses and forest cover, the Contractor shall provide the labour with gum boots and gloves. He shall also make snake antidotes available on site. Emergency ve`hicles should also be kept ready to rush the patient to the nearest hospital. F. SAFETY DURING SOME TYPICAL CONSTRUCTION WORK Centering and scaffolding (risk of framework collapse while construction, concreting or just before concreting especially when wooden ballies are used). Many a times ballies joined together give away due to weak joints. Use of metal scaffolding and centering plates with metal fasteners are the safest and highly recommended materials for use in all road construction works for ensuring safety, stability and casting of structures. All such scaffolding should be placed on a firm and a level base on the ground for ensuring stability. No wooden scaffolding or bamboo scaffolding is to be used for any casting of heavy (RCC) structural construction as the risk to safety of workers is higher. Wilbur Smith Associates Pvt. Ltd. A.36 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Railings are to be provided along working platforms and ladders for better safety. Nets shall be hung below the scaffolding or structures where work is on-going to prevent fall of debris, stones, bricks, equipments and other heavy objects and even workmen, which could be fatal. Form-work for small/light beams and slabs The collapse of bottom of the beam that may bring down the slab as well is a risk in such operations, which may injure the labour or supervision staff. Slender ballies without bracing are not be allowed for such works. No concreting should be allowed without bracing at 300 mm above ground and at mid way for normal beams and slabs. The bracings should be for the support of beams as well as the slabs. Direct ballies support from the ground and the practice of tying planks with binding wire to the steel reinforcement shall not be allowed. A temporary railing and properly based working platforms along the periphery of slab reduces risk to the life of labour and supervision staff. Dismantling of Scaffoldings Dismantled materials may fall on passer-by and workers. Workers could also get injured during the removal of such materials. Prior to dismantling of scaffoldings/working platforms, the area of operation should be closed for all outsiders. No one should be allowed within 50 mt. from the place of demolition. Helmets, safety belts and other PPE must be worn by all the workers engaged in such a work. This work requires careful handling by an experienced supervisor/work force and should be executed with utmost caution. Gradual dislodging and use of PPE is required. Column Reinforcements The tendency of bar-benders is to tie the vertical steel with coir rope or 8 mm steel rods as ties on all four sides of the column reinforcements. Reinforcement to columns shall be by welding MS rods with metal scaffolding to keep it in position till the final casting of RCC is done. Fall of Objects or Debris from a Height At bridges construction sites (or in work areas at a height above ground level) thick nylon net or hessian barriers shall be used to prevent any splinter, debris, mortar or concrete from falling onto the passers by or workmen around. Water Storage Tanks (for General Use, Curing etc.) A child of a worker or that of a near-by resident falling into the water tank is also a risk associated with construction sites. The water tanks therefore shall be provided with protective cover/lid with locking arrangement at every site of activity to prevent accidental drowning. Site Cleaning Throwing of waste materials, broken concrete pieces, brick bats, sand etc. straight from the top of a structure onto the ground can injure a worker or a passerby. Such materials should be brought to the ground with the help of lift or the use of rope over pully with a bucket. G. OPERATION OF EXCAVATORS  Ensure that excavators are operated by authorized persons who have been adequately trained. Prevent any unauthorized use of the excavators.  Ensure that only experienced and competent persons are engaged in supervising all excavations and leveling activity. Wilbur Smith Associates Pvt. Ltd. A.37 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures  Check and maintain as per the manufacturer’s manual.  Issue relevant information, including that related to instructions, training, supervision and safe system of work in writing and provide expert supervision for guidance.  Ensure that the operation and maintenance manuals, manufacturer's specifications, inspection and maintenance log books are provided for the use of the mechanics, service engineers or other safety personnel during periodic maintenance, inspection and examination.  During tipping or running alongside the trenches, excavators must be provided with stop blocks. Avoid operating the machine too close to an overhang, ditch or hole, potential carving in edges, falling rocks and land slides, rough terrain with undulating obstacles.  Excavators must be rested on firm ground after field operation away from the road  Locate and identify underground services including telephone cables, OFC cables, sewerage and drainage lines, water supply, electrical cables etc by checking with all concerned underground utility providers.  When reversing or in cases where the operator's view is restricted, adequate supervision and signaling arrangements shall be provided.  Ensure that the type and capacity of the excavator are properly chosen for the intended purposes and site conditions. Never use a machine for any purposes other than it is designed for.  Check and report for excessive wear and any breakage of the bucket, blade, edge, tooth and other working tools of the excavator and ensure replacement/ repair to avoid mishap and break down.  Check that all linkages/hinges are properly lubricated and ensure that the linkage pins are secured. Never use improper linkage pins.  Never dismount from or mount on a moving machine. H. OPERATION OF TRUCKS AND DUMPERS  Ensure that only trained, authorized and licensed drivers operate the vehicles.  Enlist help of another worker before reversing the vehicle.  Switch-off the engine when not in use to save fuel, prevent accidents and unnecessary noise and air pollution.  Lower the tipping bodies when the machine is unattended, but if it is necessary to leave them in the raised position they should be blocked to prevent their fall by fixing a sturdy support below.  Carryout periodic servicing as per the manufacturer’s requirements. All records of maintenance and repairs should be in writing and available for verification.  Keep the vehicle tidy and the cabin free from clumsy utilities, which mightobstruct the controls and create hazards.  Follow safe driving principles including speed limits as per traffic signage. Wilbur Smith Associates Pvt. Ltd. A.38 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures  Avoid carrying additional passengers in the cabin or on the body of the dumper, while in field operation other than the connected workers.  Provide stop blocks when the vehicle is tipping into or running alongside excavations or when it is parked.  Do not overload the vehicle.  Carry only well secured loads and use proper covers and fasteners. I. Manual Handling and Lifting  Avoid manual handling of heavy and hazardous objects and chemicals.  Pre-assess the actual requirement of manpower in case of emergency situations.  The hazardous and poisonous materials should not be manually handled without proper equipments/gears and prior declaration of the risks needs to be made to the involved workers.  All concerned persons shall be trained in proper methods of lifting and carrying.  In all manual operations where groups of workers are involved, a team leader with necessary training to handle the entire work force in unison has to be provided for.  Watch and ward to control/supervise/guide movement of equipments and machineries, loading and unloading operations, stability of the stockpiled materials and irregularly shaped objects have to be provided for safety and security of workers.  Carriageway used by the workers must be free from objects, which are dangerous.  Loading and unloading from vehicles shall be under strict supervision. J. ELECTRICAL HAZARDS IN CONSTRUCTION AREAS  Statutory warning leaflets/posters are to be distributed/displayed by the Contractor in the vicinity of work sites for the benefit of all workers, officers and supervisors as well as the public, indicating the do’s and don’ts and warning related to electrical hazards associated with operations to be executed/in progress.  All wires shall be treated as live wires.  Report about dangling wires to the site-in-charge and do not touch them.  Only a qualified electrician should attempt electrical repairs.  Train all workers about electrical safety.  Shut down the equipment that is sparking or getting over heated or emitting smoke at the time of operation, if it is not the normal way of working of such machines.  Inform technical person/s for required maintenance.  Never used damaged wires for electrical connection.  Demolition, tree felling and removal of overhead transmission lines shall be undertaken with strong, efficient and closely monitored arrangements to avoid accidents. Wilbur Smith Associates Pvt. Ltd. A.39 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures K. USE AND STORAGE OF GAS (LPG)  Store filled gas/LPG cylinder in a secure area – mark this as a no smoking area.  Transport, store, use and secure cylinders in upright position.  Ensure proper ventilation at the ground level in locations where LPG is in use.  Avoid physical damage to the cylinders.  Never weld near the cylinder.  Store empty cylinders secured and upright.  Make sure that the cylinder is closed immediately after use.  Investigate immediately if there is the smell of LPG or gas.  Never use destenched gas/LPG on site.  Make sure that there is no other unrelated fire in the vicinity of the cylinder. L. GAS WELDING  The welders and welding units should follow all the basic principles of welding for safety and security.  Use face shield to protect the eyes.  Use goggles, particularly when chipping slag and cutting strips.  Use gloves long enough to protect wrists and forearms against heat, sparks, molten metal and radiation hazards.  Use high-top boots/gum boots to prevent sparks, splinters, sharp edges of metal and hot welded strips, welding rods, electric cables etc. from injuring the legs.  Avoid inhaling the noxious fumes and gasses from burning electrodes by using gas masks and screen of the work area to prevent the glair moving outside it.  Keep the key hung from the regulator control for split seconds operations to stop the valve in case of any accidental damage or leakage to supply pipeline that may catch fire and cause accidents in case acetylene or LPG cylinder.  The welding area should have sufficient openings with fixed exhaust ventilators or adequate air flow openings to remove poisonous fumes and gases.  Take precautions of wearing hard hats or fiber helmets to prevent injury due to fall of any object and accidental injury from projections while welding.  Welders operating above ground should have adequate safety belt secured to stable platform to prevent accidental fall or injury from the scaffold. All electrical and gas connection lines up to the welder should be sufficiently insulated and protected from sharp edges and sharp objects. These shall not come into contact with hot metal.  Do not use gas cylinders for supporting work or as rollers. Wilbur Smith Associates Pvt. Ltd. A.40 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures  While using LPG or CNG cylinders for welding, follow all safety precautions as has been prescribed by the supplier company.  Avoid fire hazards and accidents by posting safety supervisors to oversee the activities of workers.  Do not store explosives, high inflammable materials, loose hanging overhead objects, hot welded strips etc. near gas cylinders.  Close all valves, switches and circuits while leaving the work place under proper lock and key. In case of mobile units, proper carriage procedure have to be followed for safety and security of men and materials. M. FIRE SAFETY PRACTICES  Before fire breaks out  Designate fire officers.  Store flammable material in proper areas having adequate fire protection systems.  Display sufficient warning signs.  Install fire alarm wherever required and test regularly.  Inspect fire extinguishers regularly and replace as necessary.  Train selected personal on use of fire extinguishers  Fire escape route should be kept clear at all times and clearly indicated  Display escape route maps prominently on each side.  Provide sufficient exit signs at prominent locations for directing people to the escape staircases and routes.  Train workers about the escape route and assembly point/s.  Carryout fire drill periodically. When fire breaks out  Alert all persons through fire alarms or other methods.  Put off the fire with appropriate fire extinguishers only when you are sure that you are safe to do so.  Escape if you are in danger through the fire escape route to assembly point.  Call-up Fire Service.  Fire officers to carryout head count at the assembly point. N. NOISE HAZARDS AND ITS CONTROL  Plan camp lay-out in a manner that ensures barriers/buffers between residential/ office units and high noise generating zones. Wilbur Smith Associates Pvt. Ltd. A.41 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures  Use sound meters to measure the level of noise and if it exceeds 75 dB(A), then ensure preventive measures.  Make personnel aware of noisy areas by using suitable warning signs and insist on use of ear protectors/ear plugs to prevent excess noise affecting the workmen.  Reduce noise at source by: use of improved equipments; regular and proper maintenance of the machinery as per the manufacturer’s manual; by replacing rickety and noisy equipments and machineries. Screening locations with noise absorbing material; making changes in the process/equipment; controlling machine speeds; ensuring that two noise-generating machines are not running at the same time close to each other at same location; using cutting oils and hydraulic noise breakers; providing vibration and noise absorbing platform and firm embedding of equipments with fasteners.  Appoint a competent person to: carryout a detailed noise assessment of the site; designate ear protection zone/s; give training/instructions on the necessary precautionary measures to be observed by site personnel including using suitable type of ear protection equipments. O. PERSONAL PROTECTIVE EQUIPMENT General  Provision of personal protective equipment has to be made over and above all measures taken for removing or controlling safety hazards on a work site.  Ensure that sufficient personal protective equipments are provided and that they are readily available for every person who may need to use them.  The Contractor ’s Project Manager shall ensure that all persons make full and proper use of the personal protective equipment provided.  Provide instruction/s and training for the proper use and care of personal protective equipment.  Ensure that the personal protective equipments are in good condition.  Train workers to report unintentional damages for replacement and to always keep the personal protective equipment clean.  PPE includes, but may not be limited to, hard hats, goggles, ear plugs, gloves, air filters/masks, boots, ropes etc. Eye Protection  Road construction work sites, quarries and crushers are full of dust particles, sand, splinter, harmful gases, bright light and welding arc lights, which are injurious for the eyes. Therefore, eye protection and adequate lighting in work areas is required. All workers, supervisors and inspection officers and dignitaries coming over for study of works should be compelled to wear eye protecting glasses/goggles properly fitting the eye sockets to prevent damage due to dust, gases and other particles.  Head Protection Wilbur Smith Associates Pvt. Ltd. A.42 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures  Hard hats are compulsory for all workers, supervisors and managers/officials while working and/or inspecting a work sites.  Hard hat areas shall be demarcated clearly.  Hearing Protection  Provide ear plugs or ear muffs to the workers and to those who need to get in and out of a high noise area frequently. Use re-usable earplugs when the reduction required (15-25 dBA) is not excessive. Use earmuffs where a large attenuation of upto 40 dBA is demanded.  Do not use dry cotton wool for hearing protection because it doesn’t provide any such protection.  Provide disposable ear plugs for infrequent visitors and ensure that these are never re-used.  Replenish ear plugs from time to time for those who need to work continuously for a long period in a high noise area/s.  Use ear muffs with replaceable ear cushions because they deteriorate with age or may be damaged in use.  Avoid wearing spectacles with ear muffs.  Use soap and water or the recommended solvent for cleaning ear muffs.  Respiratory (Protective) Equipment  Wear suitable maks for protection when there is a potential for small particles entering the lungs, e.g. emptying of cement bags, working at crusher sites etc.  Provide training to all persons using the masks/respirators for their correct fitting, use, limitations and symptoms of exposure.  Clean and inspect all respirators before and after use.  Store respirators properly when not in use.  Safety Footwear  Wear suitable footwear for work  Use safety footwear on site or in other dangerous areas.  Wear suitable safety shoes or ankle boots when working anywhere where there is high risk of foot injuries from slippery or uneven ground, sharp objects, falling objects etc.  All safety footwear, including safety shoes, ankle boots and rubber boots, should be fitted with steel toecaps.  Avoid wearing flip flops, high heeled shoes, slippers, light sport shoes in situations where there is a risk of foot injury.  Keep shoelace knots tight.  Hand Protection Wilbur Smith Associates Pvt. Ltd. A.43 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures  Wear suitable gloves for selected activities such as welding, cutting and manual handling of materials and equipment.  Do not wear gloves where there is a risk of them becoming entangled in moving parts of machinery.  Wash hands properly with disinfectant soap and clean water before drinking or eating.  Wash hands immediately after each operation on site when the situation warrants. P. FIRST AID  Provide first aid boxes at every work site in a cool and shaded place.  Ensure that training on the use of the first aid box is provided to at least every supervisor on the site.  Display the list of persons along with their contact numbers who are trained on providing first aid.  Ensure that every first aid box is marked "First Aid" in English and in local language.  Check for expiry dates and replace the contents, as necessary.  Maintain a register on health records including injuries/accidents. Q. ACCIDENT INVESTIGATIONS  Carryout the investigation/s as quickly as possible.  Investigation should be carried out both internally as well as through third party.  Conduct interviews with as many witnesses as necessary including the affected persons and supervising officials.  Do not rely on any one/limited source of evidence.  Check all the log books, stock registers, issue registers, movement registers on site  safety regulations, traffic signals and signal men activities, signage, as well as other field positions and keep a record of all investigations through audio-visual and electronic medium for presenting an evaluation of the incident/s.  After completion of the investigation/enquiry, a summary of the facts recorded, sequence of happenings, persons-in-charge, persons examined, equipments and machineries tested, follow-up of action as per legal requirements, copy of station diary entry, hospital entry, safety regulations etc. to be prepared with a comparative analysis for proper assessment. Wilbur Smith Associates Pvt. Ltd. A.44 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 10. Guidelines for Preparation of Traffic Management Plan The Contractor shall at all times carry out work on the road in manner creating least interference to the flow of traffic with the satisfactory execution. For all works involving improvements to the existing state highway, the Contractor shall, in accordance with the directives of the CSC, provide and maintain, during execution of the work, a passage for traffic either along a part of the existing carriageway under improvement, or along a temporary diversion constructed close to the state highway. The Contractor shall take prior approval of the CSC regarding traffic arrangements during construction. A. ENSURING TRAFFIC SAFETY AND CONTROL Where subject to the approval of the Engineer the execution of the works requires temporary closure of road traffic use, the Contractor shall provide and maintain temporary traffic diversions. The diversions shall generally consist of 200 mm thickness of gravel 4.5 meters wide laid directly upon natural ground and where any additional earthworks are required for this purpose that will be provided under the appropriate payment items. Where the execution of the works requires single-lane operation on public road, the Contractor shall provide and maintain all necessary barriers, warning signs and traffic control signals to the approval of the Engineer. With the exception of temporary traffic arrangements or diversions required within the first 4 weeks of the Contract, the Contractor shall submit details of his proposals to the Engineer for approval no less than 4 weeks prior to the temporary arrangement or diversion being required. Details of temporary arrangements or diversions for approval as soon possible after the date of the Letter of Acceptance. The colour, configuration, size and location of all traffic signs shall be in accordance with the code of practice for road sign. In the absence of any detail or for any missing details, the signs shall be provided as directed by the Engineer (CSC). The Contractor shall take all necessary measures for the safety of traffic during construction and provide, erect and maintain such barricades, including signs, marking, flags, lights and flagmen as may be required by the Engineer for the formation and protection of traffic approaching or passing through the section of the road under improvement. Before taking up any construction, an agreed phased programme for the diversion of traffic or closer of traffic on the road shall be drawn up in consultation with the SE. At the points where traffic is to deviate form its normal path (whether on temporary diversion or part width of the Carriageway) the lane width path for traffic shall be clearly marked with the aid of pavement markings, painted drums or a similar device to the directions of the SE. At night, the passage shall be delineated with lanterns or other suitable light source. One-way traffic operation shall be established whenever the traffic is to be passed over part of the carriageway inadequate for two-lane traffic. This shall be done with the help of temporary traffic signals or flagmen kept positioned on opposite sides during all hours. For regulation of traffic, the flagmen shall be equipped with red and green flags and lanterns/lights. On both sides, suitable regulatory / warnings signs as approved by the SE shall be installed for the guidance of road users. On each approach, at least two signs shall be put up, one close to the point where transition of carriageway begins and the other 120 m away. The signs shall be of design and of reflectory type, if so directed by SE. Wilbur Smith Associates Pvt. Ltd. A.45 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Upon completion of the works for which the temporary traffic arrangements or diversions have been made, the Contractor shall remove all temporary installations and signs and reinstate all affected roads and other structures or installations to the conditions that existed before the work started, as directed by the Engineer. B. PREPARATION OF TRAFFIC MANAGEMENT PLAN The Contractor should prepare a traffic management plan, in consultation with (i) local self government, (ii) traffic police and (iii) local PWD office and shall submit the same for the approval of CSC. Any construction work shall be initiated only after getting approval for the same from CSC and it should comprise the following:  Section-1: A set of drawings showing diversion plans including any alternate route, if proposed for both local traffic and long distance traffic including pilgrims.  Section-2: Location and type of signages, both along the project stretch under construction and alternate road.  Section-3: List of safety measures that will be adopted at the site during construction.  Section-4: Details on information dissemination to be undertaken by the contractor about the traffic diversion plans to the public, including (i) mode of dissemination, (ii) locations along the stretch for display boards and pamphlet distribution , (iii) content of display boards and pamphlets.  Section 5: List of officers consulted in (i) local self government, (ii) traffic police and (iii) local PWD office. If any alternate routes are selected for traffic diversion, the same shall be undertaken in adherence to following criteria:  Width of road  Existing traffic  Pavement conditions C. SAFETY MEASURES TO BE UNDERTAKEN Signs, lights, barriers and other traffic control devices, as well as the riding surface of diversion shall be maintained in a satisfactory condition till such time they are required as directed by the CSC. The temporary traveled way shall be kept free of dust by frequent applications of water, if necessary. The signages and devices required includes the following:  Barricading  Men at work  Keep Left  Go slow  Flag men  Narrow signs Wilbur Smith Associates Pvt. Ltd. A.46 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures  Lantern(Amber Blinker)  Traffic control Lights  Cones Safety jackets and helmets should be provided to all the workers/ Engineers working on the road. Fixed mobile solid barricades must be placed between the workmen and traffic or pedestrian and traffic. All the safety signs should be according to IRC: 67 and IRC: SP: 55: 2001 Examples of some good practice in traffic control during construction are shown in the figures below. Wilbur Smith Associates Pvt. Ltd. A.47 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Wilbur Smith Associates Pvt. Ltd. A.48 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 11. Guidelines for Storage, Handling, Use and Emergency Response for Hazardous Substances A. HANDLING HAZARDOUS SUBSTANCES (INCLUDING CHEMICALS)  As far as practicable the hazardous materials will be stockpiled under proper mechanical loading, unloading and stacking aided by manual labour where necessary.  Exercise great care in the storage and use of chemicals because they may be explosive, poisonous, corrosive or combustible.  Separate different chemicals physically and store accordingly after proper labeling.  Stock taking of all hazardous will be mandatory together with enforcement of manufacturer’s or supplier’s safety standard/s and drill exercises.  New and less known chemicals and building materials, for which toxicological studies are wanted, need to be properly evaluated prior to their inclusion in the materials list.  All containers should be clearly labeled to indicate contents.  Maintain the Material Safety Data Sheet of all chemicals for reference on safety precautions to be taken and the use of suitable PPE.  Ensure use of correct personal protective equipment before allowing workers to handle chemicals.  When opening containers, ensure holding of a rag over the cap/lid or use of safety gloves, as some volatile liquids tend to spurt up when released.  Eye fountain, emergency shower and breathing apparatus should be available near the workplace.  Ensure immediate medical attention in case of spill/splash of a chemical.  Safety instructions for handling emergency situations shall be displayed prominently at both the storage and use locations. B. TRANSPORTATION, REFUELING AND MAINTENANCE PROCEDURE  Truck or suitable containers will bring in all fuel and fluids.  There will be no storage of fuel, oil or fluids within 200m of a water line.  Prior to re-fueling or maintenance, drip pans and containment pans will be placed under the equipment.  Absorbent blankets may also be required to be placed under the equipment and hoses where there is a possibility of spillage to occur.  All used oils or fluids will be properly contained and transported to appropriately licensed (authorized) disposal facilities.  Following re-fueling and maintenance, the absorbent blankets (if any) and spill pans will be picked up and the fuel truck or container moved outside of the 100m (or 50m) wide area. Wilbur Smith Associates Pvt. Ltd. A.49 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures C. EMERGENCY SPILL PROCEDURE  Should a spill occur, either through accidental spillage or equipment failure, the applicable emergency spill procedure as outlined in sections below and/or as directed by the manufacturer/supplier shall be followed: Spill Procedure (Inside a Stream)  In the case of a spill, overflow or release of fluid into the stream waterway (whether water is flowing during the spill or not), do what is practical and safely possible to control the situation, while sending SOS for help from the technical wings and fire brigade or any other govt. agency.  Stop the flow  Stop the release into the waterway  Shut down the equipments  Close valves and pumps.  Plug leaking of damage hosepipes or containers with suitable sealants or temporary plugs at the holes. Remove Ignition Sources  Cut off the supply sources and shut down the sources of power supply.  Cordon up the area and salvage the spilled materials for recycling or disposal as would be suggested by the technical experts or as per the manufacturer’s guidelines for the product. In case of inflammable materials, mobile phones, electrical switches and heat generating machines, sparking electrodes etc. shall not be operated.  Portable fire extinguishers need to be kept handy in such vehicles for immediate use as a damage control measure. Clean-up and Disposal  Emergency Services shall be engaged for the containment, clean-up and disposal of contaminants released into the environment. Reporting  The Contractor 's Environmental Officer will document the event and submit the reports to the Engineer, the Client and appropriate regulatory agencies like the Pollution Control Board. Procedure Review  The Engineer will review the report, determine if changes are required to be incorporated in the plan of activity under the revised guidelines and recommendation/s that have been suggested by the technicians/manufacturer/ supplier /fire brigade /SPCB /environment officer of the PIU, as the case may be. Spill Procedure (On Land) Wilbur Smith Associates Pvt. Ltd. A.50 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures  All types of spills are hazardous - whether liquid or amorphous or solid and accordingly the spill has to be dealt with. For liquids, sealing the leakage or emptying the container into another empty vessel may be considered. For solid or semi-solid or viscous products, special salvage equipments are to be used. For fine particles and water soluble chemicals, neutralizing or scraping the affected soil from the area has to be resorted to with mechanical removal and depositing at a safe site as would be recommended by experts. Notification  All legal authorities such as civil administration including the district Collector, the sub- divisional officer, Tehsildar, the local SHO of the police station, the SP, Divisional Forest Officer, the Inspector of Factories and Boiler, the SPCB authority monitoring the pollution in the area, site engineer/supervision consultant and environmental officer of OWD/PIU, local gram panchayat and people’s representatives have to be informed about the incident, the probable damage, current and after effects, precautionary measures to be taken and already taken and restrictions imposed on movement of men, material, live stock etc in an around the site of spill. Cleanup and Disposal  The Engineer's Environmental Officer will ensure that a proper cleanup and disposal method is determined. Absorbent pads will soak up the spilled material. The pads will be contained and removed from site for disposal at a licensed (authorized) facility. Reporting  The Contractor 's Environmental Officer will document the event and submit reports to the Engineer, the Client and appropriate regulatory agencies like the Pollution Control Board(s). Procedure Review  The Engineer will review the report; determine, if changes are required to procedures and; recommend implementation of all required changes. Wilbur Smith Associates Pvt. Ltd. A.51 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 12. Reporting Format for Identification of Construction Camp Site A Project Details Date of reporting: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project B Site Details 1. Place Name Landmark 2. Name of Panchayath / Revenue Municipality Village 3. Taluk District 4. Nearest Chainage (km) location LHS/ RHS of the project road w.r.t. project road 5. Area of site Current land use 6. Ownership of the land Owned / leased Survey no. 7. If leased / rented, name, address and contact details of owner 8. Distance* from any major settlement or village 9. Distance from any major surface water course or body 10. Distance from ecologically sensitive areas 11. Distance from the Project road 12. Width and type (paved or unpaved) of access road 13. No of trees with girth> 0.3m Wilbur Smith Associates Pvt. Ltd. A.52 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 14. No of trees to be cut 15. Is top soil conservation required (Yes/ No) (a) Location map (b) Layout plan (c) Photographs of the site List of enclosures: (d) List of machinery, equipments and vehicles to be used (e) List of schools and hospitals with in 200 mts distance from the boundary of the camp C. Submission Submitted by Approved / Rejected by Details (Environment & Safety Engineer of (Environmental Officer of CSC) Contractor ) Signature & date Name Designation Remarks by CSC * All distances are to be measured from the boundary of the site. Note: Contractor has to fill and submit this format to the CSC upon identification of each construction camp site. Subsequently, the EO of CSC has to visit the site and approve / reject the site with reasons. The EO of CSC has to give a copy of this format to the Contractor after his approval / rejection with remarks. On approval of a site, the Contractor has to prepare the Management and Redevelopment Plan for this site as per the Guidelines given in EMP and submit to CSC for approval. Wilbur Smith Associates Pvt. Ltd. A.53 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 13. Reporting Formats for Identification of Labour Camp Site A Project Details Date of reporting: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project B Site Details 1. Place Name Landmark 2. Name of Panchayath / Revenue Municipality Village 3. Taluk District 4. Nearest Chainage (km) location w.r.t. LHS/ RHS of the project road project road 5. Area of site Current land use 6. Ownership of the land Owned / leased Survey no. 7. If leased, name, address and contact details of owner 8. Distance* from any major settlement or village 9. Distance from any major surface water course or body 10. Distance from ecologically sensitive areas Wilbur Smith Associates Pvt. Ltd. A.54 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 11. Distance from the Project road 12. Width and type of access road 13. No of trees with girth> 0.3m 14. No of trees to be cut 15. Is top soil conservation required (Yes/ No) Location map List of Layout Plan enclosure: Photographs of the site C. Submission Submitted by Approved / Rejected by Details (Environment & Safety Engineer of (Environmental Officer of CSC) Contractor ) Signature & date Name Designation Remarks by CSC * All distances are to be measured from the boundary of the site. Note: Contractor has to fill and submit this format to the CSC upon identification of each Labour camp site. Subsequently, the EO of CSC has to visit the site and approve / reject the site with reasons. The EO of CSC has to give a copy of this format to the Contractor after his approval / rejection with remarks. On approval of a site, the Contractor has to prepare the Management and Redevelopment Plan for this site as per the Guidelines given in EMP and submit to CSC for approval. Wilbur Smith Associates Pvt. Ltd. A.55 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 14. Reporting Format for Identification of Quarry and Stone Crusher Site A Project Details Date of reporting: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project B Site Details 1. Place Name Landmark 2. Name of Panchayath / Revenue Municipality Village 3. Taluk District 4. Nearest Chainage (km) of location w.r.t. LHS/ RHS the project road project road 5. Area of site Current land use 6. Ownership of the land Owned / leased Survey no. 7. If leased, name, address and contact details of owner 8. Type of material available and its quantity 9. Distance* of the site from: (i) any major settlement or village (ii) any major surface water course or body (iii) any bridge, water supply system, infiltration well or pumping installation (iv) any public road (v) ecologically sensitive areas (vi) nearest quarry / stone crusher 10. Distance from project road Wilbur Smith Associates Pvt. Ltd. A.56 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 11. Width and type of access road 12. No of trees with grid >0.3m 13. No of trees to be cut 14. Is top soil conservation required: Yes/ No 15. Place identified for top soil conservation List of enclosure: (a) Location map (b) Layout plan (c) Photographs of the site (d) List of schools and hospitals with in 200 mts distance from the boundary of the site C. Submission Submitted by Approved / Rejected by Details (Environment & Safety Engineer of (Environmental Officer of CSC) Contractor ) Signature & date Name Designation Remarks by CSC * All distances are to be measured from the boundary of the site. Note: Contractor has to fill and submit this format to the CSC upon identification of each quarry and stone crusher site. Subsequently, the EO of CSC has to visit the site and approve / reject the site with reasons. The EO of CSC has to give a copy of this format to the Contractor after his approval / rejection with remarks. On approval of a site, the Contractor has to prepare the Management and Redevelopment Plan for this site as per the Guidelines given in EMP and submit to CSC for approval. Wilbur Smith Associates Pvt. Ltd. A.57 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 15. Reporting Format for Identification of Borrow Areas A Project Details Date of Reporting: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project B Site Details 1. Place Name Landmark 2. Name of Panchayath / Revenue Municipality Village 3. Taluk District 4. Nearest Chainage (km) of location w.r.t. LHS/ RHS the project road project road 5. Area of site Current land use 6. Ownership of the land Owned / leased Survey no. 7. If leased, name, address and contact details of owner 8. Distance* from any major settlement or village 9. Distance from any major surface water course or body 10. Distance from ecologically sensitive areas 11. Distance from the Project road 12. Width of and type of access road 13. No of trees with girth> 0.3m 14. No of trees to be cut 15. Is top soil conservation required (Yes/ No) Location map Layout Plan List of enclosure: Photographs of the site Wilbur Smith Associates Pvt. Ltd. A.58 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures C. Submission Submitted by Approved / Rejected by Details (Environment & Safety Engineer of (Environmental Officer of CSC) Contractor ) Signature & date Name Designation Remarks by CSC * All distances are to be measured from the boundary of the site. Note: Contractor has to fill and submit this format to the CSC upon identification of each borrow area. Subsequently, the EO of CSC has to visit the site and approve / reject the site with reasons. The EO of CSC has to give a copy of this format to the Contractor after his approval / rejection with remarks. On approval of a site, the Contractor has to prepare the Management and Redevelopment Plan for this site as per the Guidelines given in EMP and submit to CSC for approval. Wilbur Smith Associates Pvt. Ltd. A.59 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 16. Reporting Format for Identification of Debris Disposal Site A Project Details Date of Reporting: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project B Site Details 1. Place Name Landmark 2. Name of Panchayath / Revenue Municipality Village 3. Taluk District 4. Nearest Chainage (km) of location w.r.t. LHS/ RHS the project road project road 5. Area of site Current land use 6. Ownership of the land Owned / leased Survey no. 7. If leased, name, address and contact details of owner 8. Distance* from any major settlement or village 9. Distance from any major surface water course or body 10. Distance from ecologically sensitive areas 11. Distance from the project road 12. Width and type of access road 13. No of trees with girth> 0.3m 14. No. of trees to be cut 15. Is top soil conservation required (Yes/ No) Location map Layout Plan List of enclosure: Photographs of the site Wilbur Smith Associates Pvt. Ltd. A.60 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures C. Submission Submitted by Approved / Rejected by Details (Environment & Safety Engineer of (Environmental Officer of CSC) Contractor ) Signature & date Name Designation Remarks by CSC * All distances are to be measured from the boundary of the site. Note: Contractor has to fill and submit this format to the CSC upon identification of each debris disposal site. Subsequently, the EO of CSC has to visit the site and approve / reject the site with reasons. The EO of CSC has to give a copy of this format to the Contractor after his approval / rejection with remarks. On approval of a site, the Contractor has to prepare the Management and Redevelopment Plan for this site as per the Guidelines given in EMP and submit to CSC for approval. Wilbur Smith Associates Pvt. Ltd. A.61 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 17. Reporting Format for Identification of Sources of Water for Construction A Project Details Date of Reporting: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project B Site Details Place Name Landmark 1. 2. Name of Panchayath / Revenue Municipality Village 3. Taluk District 4. Nearest Chainage (km) location w.r.t. LHS/ RHS of the project road project road 5. Type of water body (River / Canal / lake) 6. Existing users 7. Ownership of the water body 8. Authority responsible for giving permission 9. If private, name, address and contact details of owner 10. Distance from project road 11. Width and type of access road Location map List of enclosure: Photographs of the site Wilbur Smith Associates Pvt. Ltd. A.62 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures C. Submission Submitted by Approved / Rejected by Details (Environment & Safety Engineer of (Environmental Officer of CSC) Contractor ) Signature & date Name Designation Remarks by CSC * All distances are to be measured from the boundary of the site. Ground water should not be used for construction. Note: Contractor has to fill and submit this format to the CSC upon identification of each water source for construction. Subsequently, the EO of CSC has to visit the site and approve / reject the site with reasons. The EO of CSC has to give a copy of this format to the Contractor after his approval / rejection with remarks. Wilbur Smith Associates Pvt. Ltd. A.63 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 18. Format for Register of Complaints and it’s Reporting A Project Details Information 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration B Details of Complaint Received Site Name Sl. Date of Name and address of person with Complaint Action taken with date Signature of No. Complai contact details ESE of nt Contractor 1 2 3 A register in this format shall be maintained at each site office of the Contractor . This same format shall be used to compile and report the details of complaints received at all sites to the CSC along with the Monthly Report of the Contractor . The EO of CSC has to give instruction to the Contractor , if any further action has to be taken on any complaint. Wilbur Smith Associates Pvt. Ltd. A.64 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 19. Format for Register of Sites Opened and Closed And it’s Reporting A. Project Details Information 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration B. Site Details Sl. Site Type of Address of Site Name List of Issue Expiry Site Redevel Remarks Signature No. Opening Site* (Place name, and Clearances Date of Date of Closing opment of ESE of Date Landmark, Revenue Address Required each each Date Status Contractor Village, Survey No., of the Clearance Clearance Panchayath, Taluk Owner and District) 1 2 * Construction Camp / Labour camp / Quarry Area and Stone Crusher Unit / Borrow Area / Debris Disposal Site / Water Source. A site should be opened only after submitting the Management and Redevelopment Plan prepared as per the Guidelines given in EMP and got it approved by the EO of the CSC. A register in this format (preferably in A3 size paper) should be maintained by the Contractor for each road. This same format shall be used to report the details of sites opened and closed to the CSC along with the Monthly Report of the Contractor . The EO of CSC has to give instruction to the Contractor if any clearance is pending for any site. Wilbur Smith Associates Pvt. Ltd. A.65 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 20. Checklist for Monitoring of Construction Camp Management A Project Details Date of Monitoring: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project 5. Name of Construction Camp with sl. no. in Register of Sites B. Monitoring Details Sl. Environmental Management Measures CSC’s Corrective Actions Proposed Remarks No. observation (Yes / No / Not Applicable) 1. Whether concrete flooring and oil interceptors are provided for hot mix plant area and work shop, vehicle washing and fuel handling area? 2. Are all the first aid facilities provided in the camp? 3. Whether the plant is located in such a way that there are no residences, public institutions or hospital with in a radius of 250 M from the centre of the plant? 4. Whether the vehicle movement in and out of the camp is in a controlled manner? Wilbur Smith Associates Pvt. Ltd. A.66 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 5. Does water in cross drainage channels block? 6. Whether all the plant and machineries are well maintained and regularly serviced? 7. Whether all the drains and channels are covered? 8. Whether a green belt is provided along the periphery of camp? 9. Whether water is stored for dust suppression in the camp? 10. Whether sanitation facilities are provided for male and female? 11. Whether separate garbage bins are provided to collect the garbage? 12. Whether septic tanks with soak pits are provided? 13. Whether the location of soak pit is in such away that it does not pollute the ground water? 14. Whether a qualified safety officer is appointed for ensuring safety? 15. Whether noise barriers near sensitive receptors are provided? 16. Whether personal protective equipments are provided? Wilbur Smith Associates Pvt. Ltd. A.67 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 17. Whether top soil conservation has been undertaken? 18. Whether warning sign boards are set up at the entrance gate for the public? 19. Whether all applicable clearances are obtained and valid till date? Signature of Environment and Safety Engineer (ESE) of the Contractor with date Signature of Environmental Officer of the CSC with date Note: The Environmental Officer of the CSC has to use this format to monitor the implementation of Environmental Management Measures for each Construction Camp Quarterly. Corrective actions with specific timeframe should be proposed for each Environmental Management Measure, which is not implemented satisfactorily. A copy of the filled up format should be given to the ESE of the Contractor . CSC has to attach this format to the Quarterly Report to be submitted to PMT, with details of corrective action taken by the Contractor . Wilbur Smith Associates Pvt. Ltd. A.68 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 21. Checklist for Monitoring of Labour Camp Management A Project Details Date of Monitoring: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project 5. Name of Labour Camp with sl. no. in register of sites B Monitoring Details Sl. Environmental Management Measures CSC’s observation Corrective Actions Proposed Remarks No. (Yes / No / Not Applicable) 1. Whether the camps are floored with concrete? 2. Are all the first aid facilities provided in the camp? 3. Whether the camp is located in such a way that there are no residences, public institutions or biosensitive area with in a radius of 500 M from the camp? 4. Whether the vehicle movement in and out of the camp is in a controlled manner? 5. Whether LPG for cooking is provided? Wilbur Smith Associates Pvt. Ltd. A.69 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 6. Whether safe drinking water is provided? 7. Whether all the drains and channels are covered? 8. Whether a green belt is provided along the periphery of camp? 9. Whether day care centres are provided with in the camp? 10. Whether sanitation facilities are provided separately for male and female? 11. Whether separate garbage bins are provided to collect the garbage? 12. Whether septic tanks with soak pits are provided? 13. Whether the location of soak pit is in such a away that it does not pollute the ground water? 14. Whether a qualified safety officer is appointed for ensuring safety? 15. Whether proper fencing of the camp is done? 16. Whether the workers are well aware of cleanliness, hygiene, community livings, AIDS etc.? Wilbur Smith Associates Pvt. Ltd. A.70 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 17. Whether top soil conservation has been undertaken? 18. Whether all applicable clearances are obtained and valid till date? Signature of Environment and Safety Engineer (ESE) of the Contractor with date Signature of Environmental Officer of the CSC with date Note: The Environmental Officer of the CSC has to use this format to monitor the implementation of Environmental Management Measures for each Labour Camp Quarterly. Corrective actions with specific timeframe should be proposed for each Environmental Management Measure, which is not implemented satisfactorily. A copy of the filled up format should be given to the ESE of the Contractor . CSC has to attach this format to the Quarterly Report to be submitted to PMT, with details of corrective action taken by the Contractor . Wilbur Smith Associates Pvt. Ltd. A.71 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 22. Checklist for Monitoring of Quarry and Stone Crusher Management A Project Details Date of Monitoring: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project 5. Name of Quarry & Crusher with sl. no. in register of sites B Monitoring Details Sl. Environmental Management Measures CSC’s Corrective Actions Proposed Remarks No. observation (Yes / No / Not Applicable) 1. Whether the crusher units and/or other dust-producing units are housed in a building with a wall of minimum 23 cm thickness and with suitable roofing? Wilbur Smith Associates Pvt. Ltd. A.72 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 2. Whether quarry site is located at a distance of minimum 500 mts. from human settlement, railway line, national highway, state highway, eco-sensitive area or district road*? 3. Whether stone quarry is located at a minimum distance of 50mts. from a water body4? 4. Whether the vehicle movement in and out of the camp is in a controlled manner? 5. Whether a dust extraction with collection system is provided in the crusher unit and all transfer points? 6. Whether safe drinking water is provided for the workers? 7. Whether a dust extraction unit with collection system is provided in the crusher unit and all transfer points? 8. Whether a green belt is provided along the periphery of quarry? 9. Whether adequate systems with water spray and sprinkling is provided for dust suppression? 10. Whether the roads inside the crusher premises is tarred or concreted? 11. Whether separate garbage bins are provided to collect the garbage? 4 If this is not possible, given the topographical features of the region, pl specify the reasons clearly. Wilbur Smith Associates Pvt. Ltd. A.73 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 12. Whether the crusher, impactor and other connecting unit working time is restricted to day time (6 am to 6 pm)? 13. Whether dust sealing arrangement is provided in the impactor to avoid fugitive emission? 14. Whether the ambient sound level (Leq) at a distance of 1 m away from the boundary of the site is with in 55 dB(A)? 15. Whether the occupier is conducting air monitoring on the suggested frequency? 16. Whether contour trenches are made to control soil erosion? 17. Whether workers are properly trained? 18. Whether sign boards of size 6’ x 4’ mentioning the project details and Contractor ’s details are placed for public? 19. Whether the stack height of the D.G set is adequate? 20. Whether arrangement made for avoiding fugitive emission from plants/ premises are adequate? 21. Whether natural drainage patterns are kept clear without not alteration or blockage? 22. Whether top soil conservation has been undertaken? 23. Whether all applicable clearances are obtained and valid till date? Wilbur Smith Associates Pvt. Ltd. A.74 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Signature of Environment and Safety Engineer (ESE) of the Contractor with date Signature of Environmental Officer of the CSC with date Note: The Environmental Officer of the CSC has to use this format to monitor the implementation of Environmental Management Measures for each Quarry & Crusher Quarterly. Corrective actions with specific timeframe should be proposed for each Environmental Management Measure, which is not implemented satisfactorily. A copy of the filled up format should be given to the ESE of the Contractor . CSC has to attach this format to the Quarterly Report to be submitted to PMT, with details of corrective action taken by the Contractor . Wilbur Smith Associates Pvt. Ltd. A.75 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 23. Checklist for Monitoring of Borrow Area Management A Project Details Date of Monitoring: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project 5. Name of Borrow Area with sl. no. in register of sites B Monitoring Details Sl. Environmental Management Measures CSC’s Corrective Actions Proposed Remarks No. observation (Yes / No / Not Applicable) 1. Whether the work at night is fully avoided? 2. Whether the approach road to the borrow area well maintained? 3. Whether the necessary traffic sign board is kept to control the traffic flow? 4. Whether any record is kept for the number of trees cut? Wilbur Smith Associates Pvt. Ltd. A.76 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 5. Whether a record on total quantity of earth evacuated is maintained? 6. Whether all waste materials from the borrow area is properly disposed? 7. Whether the relaying of the preserved top soil is carried out? 8. Whether required signages for the protection of the works or safety and convenience of public provided? 9. Whether effective measures are taken to control nuisance and disturbance arising from the execution work? 10. Whether the excavation is carried out in such a manner that the activity will not damage adjacent properties or cause contamination of nearby stream or other water bodies? 11. Whether the land is leveled after completion of work? 12. Whether the borrow pits are redeveloped? 13. Whether water logging is avoided? 14. Whether arrangements are made for regular sprinkling of water? Wilbur Smith Associates Pvt. Ltd. A.77 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 15. Whether top soil conservation has been undertaken? 16. Whether all applicable clearances are obtained and valid till date? Signature of Environment and Safety Engineer (ESE) of the Contractor with date Signature of Environmental Officer of the CSC with date Note: The Environmental Officer of the CSC has to use this format to monitor the implementation of Environmental Management Measures for each Borrow Area Quarterly. Corrective actions with specific timeframe should be proposed for each Environmental Management Measure, which is not implemented satisfactorily. A copy of the filled up format should be given to the ESE of the Contractor . CSC has to attach this format to the Quarterly Report to be submitted to PMT, with details of corrective action taken by the Contractor . Wilbur Smith Associates Pvt. Ltd. A.78 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 24. Checklist for The Monitoring of Debris Disposal Site Management A Project Details Date of Monitoring: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project 5. Name of Debris Disposal Site with sl. no. in register of sites B Monitoring Details Sl. Environmental Management Measures CSC’s Corrective Actions Proposed Remarks No. observation (Yes / No / Not Applicable) 1. Whether the construction operations are carrying out in such a manner that no waste material is dumped or disposed off in an unhealthy manner that causes any environmental hazard? 2. Whether the debris forming work close to the streams and water bodies are generally avoided during the monsoon period? 3. Whether the debris disposal site is at least 200 meter away from the surface water body? Wilbur Smith Associates Pvt. Ltd. A.79 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 4. Whether the debris disposal site is at least 500 meter away from the ecologically sensitive are, residential area or main road? 5. Whether the debris disposal along the water courses and close to the drainage channels are in such a manner that it do not cause any blockage to the flow of water? 6. Whether the bituminous waste is used as a surfacing material to the access roads to base camps, quarries, borrow area, temporary diversion, haulage routes etc.? 7. Whether the waste disposal details are submitted to the CSC in the prescribed format? 8. Whether the spoils from excavation of the river bed are disposing off at specified area suggested by the engineers? 9. Whether the debris generated due to dismantling of existing permanent structure is reused in the temporary diversion? 10. Whether the preserved topsoil is used for redevelopment of the area? 11. Whether green belt is developed ? Wilbur Smith Associates Pvt. Ltd. A.80 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 12. Whether all applicable clearances are obtained and valid till date? Signature of Environment and Safety Engineer (ESE) of the Contractor with date Signature of Environmental Officer of the CSC with date Note: The Environmental Officer of the CSC has to use this format to monitor the implementation of Environmental Management Measures for each Debris Disposal Site Quarterly. Corrective actions with specific timeframe should be proposed for each Environmental Management Measure, which is not implemented satisfactorily. A copy of the filled up format should be given to the ESE of the Contractor . CSC has to attach this format to the Quarterly Report to be submitted to PMT, with details of corrective action taken by the Contractor . Wilbur Smith Associates Pvt. Ltd. A.81 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 25.a. Checklist for The Monitoring of Traffic Management A Project Details Date of Monitoring: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project 5. Name of the stretch for which the traffic management is being monitored. B Monitoring Details Sl. Environmental Management Measures CSC’s Corrective Actions Proposed Remarks No. observation (Yes / No / Not Applicable) 1. Whether the Contractor has prepared a traffic management plan for this stretch ? 2. Whether the diversion plan as shown in the traffic management plan has been implemented? 3. If not, mention the reasons. Wilbur Smith Associates Pvt. Ltd. A.82 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 4. Whether the signages as mentioned in the traffic management plan have been deployed on site ? 5. If not, mention the details of what is missing and where? 6. Whether barricading has been undertaken ? 7. Whether safety jackets and helmets are provided to all the workers/ engineers working on the road ? Signature of Environment and Safety Engineer (ESE) of the Contractor with date Signature of Environmental Officer of the CSC with date Note: The Environmental Officer of the CSC has to use this format to monitor the implementation of Environmental Management Measures for each project stretch under construction Quarterly. Corrective actions with specific timeframe should be proposed for each Environmental Management Measure, which is not implemented satisfactorily. A copy of the filled up format should be given to the ESE of the Contractor . CSC has to attach this format to the Quarterly Report to be submitted to PMT, with details of corrective action taken by the Contractor . Wilbur Smith Associates Pvt. Ltd. A.83 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 26. Checklist for Monitoring of Redevelopment of Construction Camp Site A Project Details Date of Monitoring: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project 5. Name of Construction Camp with sl. no. in register of sites B Monitoring Details Sl. Environmental Management Measures CSC’s Corrective Actions Proposed Remarks No. observation (Yes / No / Not Applicable) 1. Are all the temporary structures cleared as per the list in the redevelopment plan? 2. Are all building debris, garbage, night soils and POL waste disposed off safely? 3. Are all disposal pits or trenches filled, disinfected and effectively sealed off? 4. Are the facilities that could be put to re-use maintained well ? 5. Are all the spills within the camp site effectively disposed off from the site? Wilbur Smith Associates Pvt. Ltd. A.84 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 6. All the area within the camp site is leveled and spread over with stored top soil. 7. Has the residual top soil been utilized effectively ? 8. Has the entire camp area been made clean and tidy without disturbing the adjacent lands? 9. Are the plantations / green belt along the boundary of the camp maintained well ? 10. Are the ‘before’ and ‘after’ scenarios of the site documented through photographs and submitted to CSC? 11 Are the conditions mentioned by the owner in the agreement adhered to ? 12. If not, mention the details of the conditions that are not adhered to and further steps to be taken. 13. Can ‘works completion’ certificate be issued to this site ? Signature of Environment and Safety Engineer (ESE) of the Contractor with date Signature of Environmental Officer of the CSC with date Note: The Environmental Officer of the CSC has to use this format to monitor the implementation of Environmental Management Measures for the redevelopment of each Construction Camp Site as and when it is closed. Corrective actions with specific timeframe should be proposed for each Environmental Management Measure, which is not implemented satisfactorily. A copy of the filled up format should be given to the ESE of the Contractor . CSC has to attach this format to the Quarterly Report to be submitted to PMT, with details of corrective action taken by the Contractor . Wilbur Smith Associates Pvt. Ltd. A.85 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 27. Check List for Monitoring of Redevelopment of Labour Camp Site A Project Details Date of Monitoring: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project 5. Name of Labour Camp with sl. no. in register of sites B Monitoring Details Sl. Environmental Management Measures CSC’s Corrective Actions Proposed Remarks No. observation (Yes / No / Not Applicable) 1. Are all the temporary structures cleared as per the list in the redevelopment plan? 2. Are all building debris, garbage, night soils and POL waste disposed off safely? 3. Are all disposal pits or trenches filled, disinfected and effectively sealed off? 4. Are the facilities that could be put to re-use maintained well ? 5. Are all the spills within the camp site effectively disposed off from the site? Wilbur Smith Associates Pvt. Ltd. A.86 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 6. All the area within the camp site is leveled and spread over with stored top soil. 7. Has the residual top soil been utilized effectively ? 8. Has the entire camp area been made clean and tidy without disturbing the adjacent lands? 9. Are the plantations / green belt along the boundary of the camp maintained well ? 10. Are the ‘before’ and ‘after’ scenarios of the site documented through photographs and submitted to CSC? 11 Are the conditions mentioned by the owner in the agreement adhered to ? 12. If not, mention the details of the conditions that are not adhered to and further steps to be taken. 13. Can ‘works completion’ certificate be issued to this site? Signature of Environment and Safety Engineer (ESE) of the Contractor with date Signature of Environmental Officer of the CSC with date Note: The Environmental Officer of the CSC has to use this format to monitor the implementation of Environmental Management Measures for the redevelopment of each Labour Camp Site as and when it is closed. Corrective actions with specific timeframe should be proposed for each Environmental Management Measure, which is not implemented satisfactorily. A copy of the filled up format should be given to the ESE of the Contractor . CSC has to attach this format to the Quarterly Report to be submitted to PMT, with details of corrective action taken by the Contractor . Wilbur Smith Associates Pvt. Ltd. A.87 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 28. Checklist for Monitoring of Redevelopment of Quarry and Stone Crusher Site A Project Details Date of Monitoring: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project 5. Name of Quarry & Crusher with sl. no. in register of sites B Monitoring Details Sl. Environmental Management Measures CSC’s Corrective Actions Proposed Remarks No. observation (Yes / No / Not Applicable) 1. Are all the temporary structures cleared as per the list in the redevelopment plan? 2. Are all debris, garbage, night soils and POL waste disposed off safely? 3. Are the facilities that could be put to re-use maintained well ? 4. Has the conserved top soil been reused ? 5. Are the improvement measures identified in the redevelopment plan implemented ? Wilbur Smith Associates Pvt. Ltd. A.88 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 6. If not, mention the measures yet to be implemented. 7. Has the residual top soil been utilized effectively? 8. Has the entire area been made clean and tidy without disturbing the adjacent lands? 9. Are the plantations / green belt along the boundary of the camp maintained well ? 10. Has additional tree plantation been undertaken as mentioned in the re-development plan ? 11 Has erosion control measures and slope stabilization measures been undertaken ? 12. Whether pits created by blasting are filled with overburden soil. 13. Has the local community been involved in the implementation of redevelopment plan ? 14. Are the required photographs submitted to CSC? 15. Are the conditions mentioned by the owner in the agreement adhered to ? 16. If not, mention the details of the conditions that are not adhered to and further steps to be taken. Wilbur Smith Associates Pvt. Ltd. A.89 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 17. Can ‘works completion’ certificate be issued to this site ? Signature of Environment and Safety Engineer (ESE) of the Contractor with date Signature of Environmental Officer of the CSC with date Note: The Environmental Officer of the CSC has to use this format to monitor the implementation of Environmental Management Measures for the redevelopment of each Quarry and Crusher Site as and when it is closed. Corrective actions with specific timeframe should be proposed for each Environmental Management Measure, which is not implemented satisfactorily. A copy of the filled up format should be given to the ESE of the Contractor . CSC has to attach this format to the Quarterly Report to be submitted to PMT, with details of corrective action taken by the Contractor . Wilbur Smith Associates Pvt. Ltd. A.90 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 29. Checklist for Monitoring of Redevelopment of Borrow Areas A Project Details Date of Monitoring: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project 5. Name of Borrow Area with sl. no. in register of sites B Monitoring Details Sl. Environmental Management Measures CSC’s Corrective Actions Proposed Remarks No. observation (Yes / No / Not Applicable) 1. Has slope stabilization been undertaken along the edges (if there is a level difference) ? 2. Is all the waste material raised from the borrow area disposed off properly ? 3. Has the preserved top soil been used in redevelopment of site ? 4. Has the borrow areas been re-vegetated properly ? Wilbur Smith Associates Pvt. Ltd. A.91 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 5. Is the cross drainage system and the flood water drains managed properly to avoid occurrence of flooding ? 6. Are the borrow area pits re-developed ? 7. Is the leveling of depression after filling-in of wastes undertaken? 8. Selection of Species as per OSRP Project Guidelines for plantation. 9. Has bund creation and temporary fencing been undertaken? 10. Ponds including creation of new ones and enhancing capacity of existing ones (for irrigation; pissiculture and general uses by people and/or cattle) Signature of Environment and Safety Engineer (ESE) of the Contractor with date Signature of Environmental Officer of the CSC with date Note: The Environmental Officer of the CSC has to use this format to monitor the implementation of Environmental Management Measures for the redevelopment of each Borrow Area as and when it is closed. Corrective actions with specific timeframe should be proposed for each Environmental Management Measure, which is not implemented satisfactorily. A copy of the filled up format should be given to the ESE of the Contractor . CSC has to attach this format to the Quarterly Report to be submitted to PMT, with details of corrective action taken by the Contractor . Wilbur Smith Associates Pvt. Ltd. A.92 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 30. Checklist for Monitoring of Redevelopment of Debris Disposal Site A Project Details Date of Monitoring: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project 5. Name of Debris Disposal Site with sl. no. in register of sites B Monitoring Details Sl. Environmental Management Measures CSC’s Corrective Actions Proposed Remarks No. observation (Yes / No / Not Applicable) 1. Whether preserved top soil is reused or not? 2. Rehabilitation of the dump site by planting local shrubs and other plant species. 3. Conversion of debris site into farm land, playground, parking area, block plantation area etc. Wilbur Smith Associates Pvt. Ltd. A.93 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 4. Maintenance of the hydrological flow in the area. Signature of Environment and Safety Engineer (ESE) of the Contractor with date Signature of Environmental Officer of the CSC with date Note: The Environmental Officer of the CSC has to use this format to monitor the implementation of Environmental Management Measures for the redevelopment of each Debris Disposal Site as and when it is closed. Corrective actions with specific timeframe should be proposed for each Environmental Management Measure, which is not implemented satisfactorily. A copy of the filled up format should be given to the ESE of the Contractor . CSC has to attach this format to the Quarterly Report to be submitted to PMT, with details of corrective action taken by the Contractor . Wilbur Smith Associates Pvt. Ltd. A.94 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 31. Reporting Format for Work Force Management A Project Details Date of Reporting: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project 5. Name of Work Site with sl. no. in register of sites B. Status of work force SI. Category of work force Work force in the Previous Work force added in the Work Force left in the Total work force in the No. Month (No.) reporting month (No.) reporting month (No.) reporting month (No.) 1. Unskilled Labourers 2. Skilled labourers 3. Supervisors 4. Engineers Wilbur Smith Associates Pvt. Ltd. A.95 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 5. Office Staff Sub Total Grand Total C. Categorization of work force SI. Category of work force Male Female Employment Status Residential Status Accommodation No. Status < 18 yrs. > 18 yrs. < 18 yrs. > 18 yrs. Regular Temporary Migrant Local Staying in Others Labour Camp / Quarters 1. Unskilled Labourers 2. Skilled labourers 3. Supervisors 4. Engineers 5. Office Staff Sub Total Grand Total Wilbur Smith Associates Pvt. Ltd. A.96 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures D. Details of non-working migrated people, living in the Labour Camps / Staff Quarters as part of work force family No. of children (0-6 yrs.) No. of children (7-18 yrs.) No. of adults Grand Total Male Female Total Male Female Total Male Female Total C. Submission Details Submitted by Approved by (Environmental & Safety Engineer of Contractor ) (Environmental Officer of CSC) Signature & date Name Designation Remarks by CSC Wilbur Smith Associates Pvt. Ltd. A.97 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Note: Contractor has to fill and submit this format to the CSC along with the Monthly Report. In addition to that, the Contractor has to maintain the database of work force in the form of a register. An attendance register for the work force should also be maintained by the Contractor . Contractor has to report the details of migrant work force to the nearest police station. The CSC has to visit the sites and verify the details. The EO of CSC has to give back a copy of this format to the Contractor after his approval with remarks. Wilbur Smith Associates Pvt. Ltd. A.98 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 32. Reporting Format for Occupational Health and Safety Measures A Project Details Date of Reporting: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project B Implementation Status of Health and Safety Measures Sl. Health and Safety Measures Implementation Remarks No. Status (Yes / No) 1 Appointment of qualified Environment and Safety Engineer 2 Approval for Construction Safety Management Plan by the Engineer. 3 Provision for flags and warning lights for potential hazards 4 Provision of adequate staging, form work and access (ladders with handrail) for works at a height of more than 3.0 m 5 Provision of adequate shoring / bracing / barricading / lighting for all deep excavations of more than 3.0 m depth. Wilbur Smith Associates Pvt. Ltd. A.99 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 6 Provision for sufficient lighting especially for night time work 7 Construction Workers safety - Provision of personnel protective equipments A. Helmets B. Safety Shoe C. Dust masks D. Hand Gloves E. Safety Belts F. Reflective Jackets G. Earplugs for labour 8 Workers engaged in welding work shall be provided with welder protective shields 9 All vehicles are provided with reverse horns. 10 All scaffolds, ladders and other safety devices shall be maintained in as safe and sound condition 11 Regular health checkup for labour/ Contractor 's personnel 12 Ensuring the sanitary conditions and all waste disposal procedures & methods in the camps. Wilbur Smith Associates Pvt. Ltd. A.100 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 13 Provision for insurance coverage to the workers C. Submission Details Submitted by Approved by (Environment & Safety Engineer of Contractor ) (Environmental Officer of CSC) Signature & date Name Designation Remarks by CSC Note: Contractor has to fill and submit this format to the CSC along with the Monthly Report. The CSC has to visit the sites and verify the details. Further mitigation measures, if required, can be suggested by the CSC. The EO of CSC has to give back a copy of this format to the Contractor after his approval with remarks. Wilbur Smith Associates Pvt. Ltd. A.101 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 33. Reporting Format for Water Sprinkling for Dust Suppression A Project Details Month and Year of reporting: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project 5. Location of water sprinkling B Water Sprinkling Details Particulars Days 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 No. of trips per day Quantity of Water Sprinkled (KLD) If not sprinkled, reason for the same Wilbur Smith Associates Pvt. Ltd. A.102 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures C. Submission Details Submitted by Approved by (Environment & Safety Engineer of Contractor ) (Environmental Officer of CSC) Signature & date Name Designation Remarks by CSC Note: Contractor has to fill this format for each construction site (preferably in A3 size paper) and submit to the CSC along with the Monthly Report. The CSC has to visit the sites and verify the details. Additional water sprinkling, if required, can be suggested by the CSC. The EO of CSC has to give back a copy of this format to the Contractor after his approval with remarks. Wilbur Smith Associates Pvt. Ltd. A.103 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 34. Reporting Format for Road Safety Measures During Construction A Project Details Date of Reporting: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project B Details of Safety Measures S.No Safety Measures Compliance Remarks Status (Yes / No) a. General 1 A qualified Environment and Safety Engineer should be appointed 2 A Traffic Management Plan should be prepared in accordance with IRC: SP: 55-2001 and got approved by the Engineer 3 Maintenance of existing road stretches handed over to the Contractor should be carried out b. Details of Construction Zone 1 Length of transition sub zone should be min 50 m for a speed of 50km/hr 2 Length of work sub zone in urban stretch should be<2 km 3 Length of work sub zone in rural stretch should be 5-10 km Wilbur Smith Associates Pvt. Ltd. A.104 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures c. Signages in construction zones 1 Sign saying ‘Men at Work’ should be kept 1 km ahead of Transition sub zone 2 Supplementary sign saying Diversion 1 km should be provided 3 Sign saying ‘Road Closed ahead’ should be provided 4 Compulsory Tum Right/Left sign should be provided 5 Detour sign should be placed 6 Sharp Deviation sign should be placed at end of advance warning sub zone 7 Signage should be provided in Transition Sub Work Zone 8 Signage saying ‘Keep Right/Left should be provided 9 Signage should be placed in work sub zone 10 Hazard Marker should be placed where railing for CD structure on diversion starts 11 Barricade should be provided on either side of work sub zone 12 Flag persons should be provided for traffic control 13 Flags and warning lights should be provided at Construction zones 14 Metal drum /empty bitumen drum delineator, painted in circumferential strips of alternate black and white Wilbur Smith Associates Pvt. Ltd. A.105 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 100mm wide 2 coats fitted with reflectors 3 Nos of 7.5cm diameter or Barricades/caution tapes should be provided in construction zones 15 Plastic crash barriers should be provided 16 Demarcations (fencing, guarding and watching) should be provided at bridge / culvert construction sites 17 Arrangements should be made for controlled access and entry to Construction zones 18 Regular Inspection of Work Zone Traffic Control Devices should be carried out by authorized Contractor personnel 19 All vehicles should be provided with reverse horns 20 Speed of construction vehicles should be controlled through road safety training of drivers d. Signage in Termination sub zone 1 Sign for indication of end of work zone should be placed 120m from end of termination sub zone e. Road Delineators 1 Roadway indicators should be provided 2 Hazard markers should be provided 3 Object markers should be provided Wilbur Smith Associates Pvt. Ltd. A.106 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures C. Submission Details Submitted by Approved by (Environment & Safety Engineer of Contractor ) (Environmental Officer of CSC) Signature & date Name Designation Remarks by CSC Note: Contractor has to fill this format and submit to the CSC along with the Monthly Report. The CSC has to visit the sites and verify the details. Additional safety measures, if required, can be suggested by the CSC. The EO of CSC has to give back a copy of this format to the Contractor after his approval with remarks. Wilbur Smith Associates Pvt. Ltd. A.107 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 35. Format for Register of Accidents and it’s Reporting A Project Details Date of Reporting: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project B Details of Accident and People Involved in Accident Name of site where accident happened Name and address of people involved in the accident Whether Contractor ’s personnel or General public Details of Injury Details of treatment given Details of compensation given C Type of Accident (√) Fall of person from a height Explosion Slip, trip or fall on same level Fire Struck against fixed objects Contact with hot or corrosive substance Contact with poisonous gas or toxic Struck by flying or falling objects substances. Contact with poisonous gas or toxic Struck by moving objects substances Struck / caught by cable Hand tool accident Stepping on hail etc. Vehicle / Mobile plant accident Handling without machinery Machinery operation accident Crushing / burying Other (please specify) Drowning or asphyxiation D Agent Involved in Accident (√) Wilbur Smith Associates Pvt. Ltd. A.108 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Machinery Stair edge Portable power appliance Excavation / underground working Vehicle or associated Ladder equipment /machinery Material being handled, used or Scaffolding /gondola stored Gas, vapor, dust, fume or Construction formwork, shuttering and oxygen false work. Electricity supply cable, wiring Hand tools switchboard and associated equipment Floor edge Nail, sllnter or chipping Floor opening Other (Please specify) Left shaft E Unsafe Action Relevant to the Accident (√) Operating without authority Failure to use proper footwear Failure to secure objects Failure to use eye protector Making safety devices Failure to use respirator inoperative Working on moving or Failure to use proper clothing dangerous equipment Failure to use warn others or given Using un-safety equipment proper signals Adopting unsafe position or Horseplay posture Operating or working at unsafe No unsafe action speed Unsafe loading, Placing, mixing Others (please specify) et Failure to use helmet F Lack of Safety Measures Relevant to the Accident (√) No protective gear Unsafe layout of job, traffic etc. Defective protective gear Unsafe process of job methods Improper dress / footwear Poor housekeeping Improper guarding Lack of warning system Improper ventilation Defective tool, machinery or materials Improper illumination No unsafe condition Improper procedure Others (please specify) G Personal Factor Relevant to the Accident (√) Wilbur Smith Associates Pvt. Ltd. A.109 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Incorrect attitude /motive No unsafe personal factor. Unsafe act by another person Other (please specify) H Details of Corrective and Preventive action taken 1 2 3 4 I Submission Details Submitted by Approved by (Environment & Safety Engineer of (Environmental Officer of CSC) Contractor ) Signature & date Name Designation Remarks by CSC Note: Contractor has to fill this format as and when an accident happens and submit to the CSC along with the Monthly Report. The CSC has to visit the sites and verify the details. Additional safety measures, if required, can be suggested by the CSC. The EO of CSC has to give back a copy of this format to the Contractor after his approval with remarks. Wilbur Smith Associates Pvt. Ltd. A.110 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 36. Reporting Format for Environmental Pollution Monitoring A Project Details Date of Reporting: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project B Environmental Monitoring Details SI. Details of Monitoring Period of Details of values exceeding Reasons for pollution Details of Corrective Remarks No Location Monitoring the relevant standards actions taken a. Air Monitoring 1. 2. 3. Wilbur Smith Associates Pvt. Ltd. A.111 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures b. Water Monitoring 1. 2. 3. c. Noise Monitoring* 1. 2. 3. Wilbur Smith Associates Pvt. Ltd. A.112 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures C Submission Details Submitted by Approved by (Environment & Safety Engineer of Contractor ) (Environmental Officer of CSC) Signature & date Name Designation Remarks by CSC * Noise monitoring along the road will be done by the CSC, using the Noise Meter of PMT. The CSC has to give the monitoring results to the Contractor for corrective actions, if any, required and including in this report. Note: The Contractor has to conduct Environmental Monitoring through a NABL approved Laboratory as per the Environmental Monitoring Plan given in the EMP, fill this format and submit to the CSC along with the Monthly Report, if monitoring was due in that month. A copy of the monitoring report given by the Laboratory has to be attached to this format. The CSC has to visit the sites and verify the details. Additional mitigation measures, if required, can be suggested by the CSC. The EO of CSC has to give back a copy of this format to the Contractor after his approval with remarks. Wilbur Smith Associates Pvt. Ltd. A.113 Kerala State Transport Project, Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 37. Reporting Format for Enhancement and Mitigation of Common Property Resources A Project Details Date of reporting: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project B Details of Enhancement Measures Sl. Location with % work Remarks and reasons for delay, if any. No chainage completed . a Raising embankment height b Public water sources c Bus stops and bus bays Wilbur Smith Associates Pvt. Ltd. A.114 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures d Water bodies e Auto / Jeep / Taxi stands f Sign Boards g Oxbow land (Type C) development h Cultural Properties Wilbur Smith Associates Pvt. Ltd. A.115 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures i Any other measures C Submission Details Submitted by Approved by (Environment & Safety Engineer of (Environmental Officer of CSC) Contractor ) Signature & date Name Designation Remarks by CSC Note: The Contractor has to fill the details of enhancement measures carried out for amenities / facilities other than cultural properties during the reporting month in this format and submit to the CSC along with the Monthly Report. Overall progress in this activity for the entire project road is to be included in the Monthly Report. The CSC has to visit the sites and verify the details. Additional mitigation measures, if required, can be suggested by the CSC. The EO of CSC has to give back a copy of this format to the Contractor after his approval with remarks. Wilbur Smith Associates Pvt. Ltd. A.116 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 38. Reporting Format for Tree Plantation A Project Details Date of reporting: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project B Details of Trees Planted Sl. Location with No. of % work Remarks and reasons for delay, if No chainage Trees to completed any . be Planted C Submission Details Submitted by Approved by (Environment & Safety Engineer of (Environmental Officer of CSC) Contractor ) Signature & date Name Designation Wilbur Smith Associates Pvt. Ltd. A.117 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Remarks by CSC Note: The Contractor has to fill the details of Trees planted during the reporting month in this format and submit to the CSC along with the Monthly Report. Overall progress in this activity for the entire project road is to be included in the Monthly Report. The CSC has to visit the sites and verify the details. The EO of CSC has to give back a copy of this format to the Contractor after his approval with remarks. Wilbur Smith Associates Pvt. Ltd. A.118 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 39. Reporting Format for Monthly Report from Contractor to Construction Supervision Consultant A Project Details Period of Reporting: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project B. Physical Progress Report Sl. Enhancement Physical Units carried over Units started in Units Units carried Cumulative % target Remarks No. Measure target from previous reporting month completed in over to next units complete / (Nos.) month reporting month completed d reasons month till end of for delay reporting month (a) (b) (c) (d=a+b-c) 1. Noise barrier Wilbur Smith Associates Pvt. Ltd. A.119 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 2. Hand pumps 3. Bus Shelter 4. Sign Boards 5. Preserving and landscaping cultural properties like shrines / hyundi Sl. Enhancement Physical Units carried over Units started in Units Units carried Cumulative % target Remarks No. Measure target from previous reporting month completed in over to next units complete / (Nos.) month reporting month completed d reasons month till end of for delay reporting month (a) (b) (c) (d=a+b-c) 6. Constructing new well 7. providing new water taps Wilbur Smith Associates Pvt. Ltd. A.120 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 8. Parking space for auto rickshaws, cars and jeep 9. Landscaping of type C oxbow lands 10. Planting trees along road side 11. Planting trees on inner side of sound insulating wall 12. Providing 1.2 mt. high fencing under via duct 13. Concrete flooring with slope drains and oil interceptors in construction camps Wilbur Smith Associates Pvt. Ltd. A.121 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures C. Details of Sites for Project Ancillary facilities Sl. Type of camp / site Cumulative No of No of sites operational Cumulative Cumulative Remarks No. sites opened No of sites No of sites redevelope closed* d 1. Construction camp 2. Labour camp 3. Quarry & stone crusher unit 4. Borrow Area 5. Debris disposal site 6. Water sources NA * A site will be considered closed after redeveloping and obtaining closure certificate from CSC. D. Summary of machinery and equipment available SI. Type of equipment / machinery / vehicles Nos. available Validity date of PUC Remarks No. certificate (as applicable) 1. Wilbur Smith Associates Pvt. Ltd. A.122 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures E. Details of lapses and notices Notice No. * Sl. Details of notices issued by CSC Date of Type of lapse Corrective Remarks No. notice (Major / Minor) actions taken *In case of minor lapse, specify whether original notice, first reminder or second reminder. Wilbur Smith Associates Pvt. Ltd. A.123 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures F. REPORTING FORMATS TO BE ANNEXED WITH THIS MONTHLY REPORT BY THE CONTRACTOR SL. REPORTING FORMAT YES/NO SL. NO REPORTING FORMAT YES/NO NO. 1 Format for Register of sites opened and closed and its reporting 8 Reporting Format for Register of Accidents and it’s Reporting 2 Format for Register of complaints and its reporting 9 Reporting Format for Enhancement and Mitigation of Cultural Properties 3 Reporting Format for Work Force Management 10 Reporting Format for Noise Barrier Construction 4 Reporting Format for Occupational Health and Safety Measures 11 Reporting Format for Enhancement Measures Other than Cultural Properties 5 Reporting Format for Top Soil Conservation 12 Reporting Format for Tree Plantation 6 Reporting Format for Water Sprinkling for Dust Suppression 13 Reporting Format for Environmental Quality Monitoring 7 Reporting Format for Road Safety Measures During Construction - - - G. SUBMITTED BY APPROVED BY SUBMISSION (ENVIRONMENT & SAFETY ENGINEER OF CONTRACTOR ) (ENVIRONMENTAL OFFICER OF CSC) DETAILS Signature & date Name Designation Remarks by CSC Wilbur Smith Associates Pvt. Ltd. A.124 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 40. Reporting Format for Monthly Report from CSC to PMT A Project Details Period of Reporting: 1. Name of project stretch and link no. 2. Name and address of the Contractor 3. Contract date and duration 4. Status of completion of the project B. Physical Progress Report Sl. No. Enhancement Measure Physical Units carried Units Units Units Cumulative % target Remarks target over from started in completed carried over units completed complete / previous reporting in reporting to next till end of d reasons (Nos.) month month month month reporting month for delay (a) (b) (c) (d=a+b-c) 1. Noise barrier 2. Hand pumps 3. Bus Shelter 4. Sign Boards Wilbur Smith Associates Pvt. Ltd. A.125 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Sl. No. Enhancement Measure Physical Units carried Units Units Units Cumulative % target Remarks target over from started in completed carried over units completed complete / (Nos.) previous reporting in reporting to next till end of d reasons month month month month reporting month for delay (a) (b) (c) (d=a+b-c) 5. Preserving and landscaping the cultural properties like shrines and hyundi 6. Constructing new well 7. providing new water taps 8. Parking space for auto rickshaws, cars and jeep 9. Landscaping of type C oxbow lands 10. Planting trees along road side Wilbur Smith Associates Pvt. Ltd. A.126 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 11. Planting trees on inner side of sound insulating wall 12. Providing 1.2 mt. high fencing under via duct 13. Concrete flooring with slope drains and oil interceptors C. Details of Sites for Project Ancillary facilities SI. No. Type of camp / site Cumulative No No of sites Cumulative No of Cumulative No of sites Remarks of sites opened operational sites redeveloped closed* 1. Construction camp 2. Labour camp 3. Quarry & stone crusher unit 4. Borrow Area 5. Debris disposal site 6. Water sources NA * A site will be considered closed after redeveloping and obtaining closure certificate from CSC. Summary of machinery and equipment available D. Wilbur Smith Associates Pvt. Ltd. A.127 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures SI. No. Type of equipment / machinery / vehicles Nos. available Validity date of PUC Remarks certificate (as applicable) 1. E. Details of lapses for which notices were issued during the previous reporting month Sl. No. Details of notices issued by CSC Date of notice Type of lapse Notice Corrective actions Remarks (Major / Minor) No. * taken by Contractor Wilbur Smith Associates Pvt. Ltd. A.128 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures *In case of minor lapse, specify whether original notice, first reminder or second reminder. F. Details of major lapses for which notices were issued during the current reporting month SI. No. List of major lapses Date of issuing notice Whether invoking penalty clause Remarks from next interim payment certificate is recommended? 1. 2. 3. 4. G. Details of minor lapses for which notices were issued during the current reporting month SI. No. List of minor lapses Date of issuing notice Whether invoking penalty Remarks clause from next interim payment certificate is recommended? Original First Second notice Reminder Reminder 2. 3. Wilbur Smith Associates Pvt. Ltd. A.129 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 4. 5. 6 7 8 H Reporting / Monitoring formats to be annexed with this monthly report by the CSC Sl. No. Reporting / Monitoring format Yes/No Sl. No Reporting / Monitoring format Yes/No 1 Format for Register of sites opened and closed and its reporting 13 Reporting Format for Environmental Quality Monitoring 2 Format for Register of complaints and its reporting 14 Checklist For Monitoring Of Construction Camp Management 3 Reporting Format for Work Force Management 15 Checklist For Monitoring Of Labour Camp Management 4 Reporting Format for Occupational Health and Safety Measures 16 Checklist For Monitoring Of Quarry And Stone Crusher Management 5 Reporting Format for Top Soil Conservation 17 Checklist For Monitoring Of Borrow Area Management 6 Reporting Format for Water Sprinkling for Dust Suppression 18 Checklist For The Monitoring Of Debris Disposal Site Management 7 Reporting Format for Road Safety Measures During 19 Check List For Monitoring Of - Construction Redevelopment Of Construction Camp Site 8 Reporting Format for Register of Accidents and it’s Reporting 20 Check List For Monitoring Of Wilbur Smith Associates Pvt. Ltd. A.130 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Redevelopment Of Labour Camp Site 9 Reporting Format for Enhancement and Mitigation of Cultural 21 Check List For Monitoring Of Properties Redevelopment Of Quarry And Stone Crusher Site 10 Reporting Format for Noise Barrier Construction 22 Check List For Monitoring Of Redevelopment Of Borrow Areas 11 Reporting Format for Enhancement Measures Other than 23 Check List For Monitoring Of Cultural Properties Redevelopment Of Debris Disposal Site 12 Reporting Format for Tree Plantation I Submission Details Submitted by Approved by (Environmental Officer of CSC) (Environmental Engineer of PMT) Signature & date Name Designation Remarks by PMT Wilbur Smith Associates Pvt. Ltd. A.131 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 41. List of Permission to be Obtained by the Contractor Sl. Type of Clearance Statutory Applicability Project Stage Responsibility No Authority 1 Consent to Establish Kerala State For operating Construction Contractor under the Air Pollution hot mix plants, (Prior to work (Prevention & Control Board crushers and initiation) Control of Pollution) construction Act, 1981 and The camps Water (Prevention & Control of Pollution) Act, 1974. 2 Consent to Operate Kerala State For operating Construction Contractor under the Air Pollution hot mix plants, (Prior to work (Prevention & Control Board crushers and initiation) Control of construction Pollution) Act, 1981 camps and The Water (Prevention & Control of Pollution) Act, 1974. 3 Permission to store Kerala State Storage and Construction Contractor Hazardous Materials Pollution Transportation (Prior to work under Hazardous Control Board of Hazardous initiation) Waste (Management Materials and and Handling) Act Explosives 1989 4 Explosive license Chief Storage of Construction Contractor under The Controller of explosive (Prior to work Explosives Act (& Explosives, materials initiation) Rules), 1884 (revised petroleum & in 1983) Explosive Safety Organization 5 PUC certificate for Motor Vehicle For all Construction Contractor vehicles for Department of construction (Prior to work construction under Kerala vehicles initiation) Central Motor and Vehicle Act 1988 6 Quarry lease deeds Mining and Quarrying and Construction Contractor and license under Geology borrowing (Prior to work The Mines Act, Department of operations initiation) 1958 * Kerala 7 Consent for ground Kerala Ground water Construction Contractor water extraction Ground Water extraction for (Prior to work Authority construction initiation) camps 8 Consent for Labour Labour camps Construction Contractor establishment of depsrtment of (Prior to work labour camp Kerala initiation) 9 Consent to establish Local Borrow area Construction Contractor borrow area* Panchayth / (Prior to work Municipality initiation) Wilbur Smith Associates Pvt. Ltd. A.132 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Sl. Type of Clearance Statutory Applicability Project Stage Responsibility No Authority 10 Consent to Operate Kerala State For Operation Contractor under the Air Pollution establishing (Prevention & Control Board Hot mix Control of plants, Pollution) Act, 1981 Crushers, construction camps and batching plants 11 Consent to Operate Kerala State For Operation Contractor under the Water Pollution discharging of (Prevention & Control Board domestic Control of waste water Pollution) Act, 1974 through soak pit * In the case of quarry, burrow areas and sand mining sites, if the Contractor is not owing the sites, the Contractor has to ensure that the material is obtained from approved sites as per MoEF guidelines dated 18th May, 2012. Wilbur Smith Associates Pvt. Ltd. A.133 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 42. Proposed Chainages of Retaining Wall Location where Embankment Height will be Raised Gabion Wall Locations (m3)>2m Sl. No. LHS Length in Sl. No R HS Length in From To m From To m 1 0+420 0+460 40 1 2+620 2+630 10 2 1+050 1+060 10 2 13+160 13+170 10 3 2+180 2+200 20 3 17+030 17+050 20 4 2+280 2+300 20 4 17+120 17+130 10 5 2+600 2+630 30 5 17+740 17+760 20 6 2+680 2+780 100 6 17+970 17+980 10 7 27+500 27+510 10 7 17+990 18+000 10 8 28+830 28+840 10 8 18+050 18+060 10 9 28+910 28+920 10 9 18+570 18+580 10 10 29+290 29+320 30 10 18+620 18+640 20 11 30+980 30+990 10 11 18+660 18+690 30 12 31+480 31+490 10 12 18+710 18+740 30 13 32+130 32+150 20 13 18+800 18+810 10 14 32+280 32+300 20 14 18+890 18+900 10 15 37+870 37+880 10 15 18+960 18+970 10 16 37+930 37+960 30 16 19+410 19+420 10 17 38+010 38+020 10 17 26+140 26+150 10 18 38+070 38+080 10 18 26+170 26+190 20 19 38+210 38+230 20 19 26+220 26+230 10 20 38+260 38+270 10 20 29+680 29+690 10 21 38+460 38+470 10 21 32+340 32+350 10 22 38+570 38+650 80 22 32+420 32+430 10 23 38+670 38+680 10 23 32+780 32+800 20 24 38+780 38+800 20 24 33+100 33+150 50 25 38+880 38+890 10 25 33+200 33+270 70 Total Length in m 560 26 33+290 33+300 10 27 33+720 33+840 120 28 34+110 34+120 10 29 38+180 38+190 10 30 38+970 38+980 10 Total Length in m 600 Gabion Wall Locations (>5m) Sl. No. LHS Length in Sl. No. RHS Length in From To m From To m 1 2210 2270 60 1 32410 32420 10 2 30560 30610 50 2 32670 32770 100 3 38030 38060 30 3 33160 33190 30 4 38240 38250 10 4 33280 33290 10 5 38810 38870 60 5 34100 34110 10 Total Length in m 210 6 38100 38110 10 Total Length in m 170 Wilbur Smith Associates Pvt. Ltd. A.134 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Retaining Wall Locations Sl. No. LHS Length in Sl. No. RHS Length in From To m From To m 1 0+470 0+570 100 1 1+520 1+590 70 2 0+730 0+750 20 2 1+660 1+700 40 3 0+900 0+940 40 3 1+790 1+800 10 4 1+000 1+020 20 4 1+900 1+950 50 5 1+040 1+050 10 5 2+010 2+050 40 6 1+070 1+150 80 6 2+120 2+150 30 7 2+150 2+170 20 7 2+340 2+380 40 8 2+310 2+360 50 8 2+920 2+930 10 9 2+580 2+590 10 9 3+000 3+050 50 10 2+640 2+670 30 10 3+110 3+120 10 11 4+720 4+730 10 11 3+200 3+270 70 12 4+800 4+830 30 12 9+880 9+890 10 13 4+860 4+870 10 13 9+980 10+130 150 14 5+040 5+110 70 14 13+130 13+150 20 15 5+150 5+190 40 15 13+170 13+180 10 16 5+230 5+320 90 16 13+250 13+260 10 17 5+500 5+550 50 17 13+310 13+320 10 18 5+730 5+780 50 18 13+490 13+510 20 19 5+870 5+880 10 19 13+630 13+640 10 20 10+000 10+030 30 20 13+650 13+790 140 21 11+530 11+550 20 21 14+560 14+580 20 22 11+590 11+600 10 22 14+640 14+700 60 23 11+620 11+630 10 23 14+760 14+830 70 24 11+710 11+770 60 24 14+960 14+990 30 25 11+800 11+810 10 25 15+020 15+040 20 26 11+860 11+900 40 26 17+060 17+110 50 27 11+950 11+960 10 27 17+140 17+180 40 28 12+000 12+010 10 28 17+220 17+290 70 29 12+120 12+180 60 29 17+320 17+330 10 30 12+260 12+310 50 30 17+340 17+350 10 31 12+430 12+490 60 31 17+360 17+370 10 32 13+670 13+700 30 32 17+380 17+390 10 33 13+740 13+770 30 33 17+400 17+490 90 34 14+160 14+180 20 34 17+510 17+520 10 35 14+210 14+220 10 35 17+550 17+670 120 36 14+250 14+260 10 36 17+730 17+740 10 37 15+990 16+030 40 37 17+770 17+810 40 38 16+090 16+160 70 38 17+850 17+920 70 39 16+190 16+220 30 39 17+950 17+960 10 40 16+290 16+330 40 40 17+980 17+990 10 41 16+360 16+370 10 41 18+000 18+040 40 42 16+470 16+490 20 42 18+060 18+130 70 43 16+560 16+600 40 43 18+180 18+200 20 44 16+620 16+660 40 44 18+290 18+320 30 45 21+390 21+430 40 45 18+440 18+450 10 46 21+620 21+630 10 46 18+530 18+540 10 47 21+660 21+680 20 47 18+550 18+560 10 Wilbur Smith Associates Pvt. Ltd. A.135 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Sl. No. LHS Length in Sl. No. RHS Length in From To m From To m 48 21+700 21+710 10 48 18+590 18+610 20 49 21+730 21+780 50 49 18+650 18+660 10 50 21+800 21+810 10 50 18+700 18+710 10 51 21+840 21+870 30 51 18+750 18+790 40 52 25+680 25+730 50 52 18+810 18+830 20 53 25+780 25+900 120 53 18+850 18+860 10 54 25+920 25+930 10 54 18+910 18+920 10 55 27+220 27+430 210 55 18+950 18+960 10 56 27+450 27+490 40 56 18+980 18+990 10 57 27+520 27+530 10 57 19+110 19+120 10 58 27+560 27+570 10 58 19+170 19+200 30 59 28+060 28+070 10 59 19+220 19+230 10 60 28+110 28+160 50 60 19+260 19+280 20 61 28+280 28+290 10 61 19+400 19+410 10 62 28+320 28+350 30 62 19+420 19+440 20 63 28+620 28+630 10 63 19+500 19+520 20 64 28+670 28+690 20 64 19+570 19+580 10 65 28+730 28+790 60 65 19+810 19+830 20 66 28+810 28+820 10 66 19+920 19+940 20 67 28+850 28+860 10 67 20+110 20+120 10 68 28+890 28+900 10 68 20+170 20+200 30 69 28+950 28+960 10 69 20+290 20+320 30 70 29+220 29+260 40 70 20+500 20+510 10 71 29+280 29+290 10 71 21+110 21+150 40 72 29+330 29+340 10 72 21+210 21+240 30 73 29+380 29+490 110 73 21+290 21+330 40 74 30+510 30+520 10 74 21+370 21+380 10 75 30+730 30+760 30 75 22+910 23+060 150 76 30+930 30+970 40 76 23+130 23+140 10 77 30+990 31+010 20 77 23+260 23+270 10 78 31+050 31+070 20 78 23+410 23+420 10 79 31+090 31+100 10 79 23+440 23+450 10 80 31+110 31+120 10 80 23+510 23+530 20 81 31+210 31+470 260 81 25+930 25+940 10 82 31+500 31+570 70 82 26+080 26+130 50 83 31+630 31+650 20 83 26+150 26+160 10 84 31+750 31+790 40 84 26+200 26+210 10 85 31+820 31+830 10 85 26+240 26+340 100 86 32+110 32+120 10 86 29+450 29+500 50 87 32+160 32+170 10 87 29+600 29+670 70 88 32+310 32+340 30 88 29+690 29+700 10 89 36+230 36+240 10 89 31+050 31+100 50 90 36+280 36+300 20 90 31+150 31+160 10 91 37+770 37+820 50 91 32+810 32+820 10 92 37+850 37+860 10 92 33+080 33+090 10 93 37+890 37+920 30 93 33+400 33+450 50 94 37+970 38+000 30 94 33+480 33+500 20 95 38+080 38+090 10 95 33+550 33+560 10 Wilbur Smith Associates Pvt. Ltd. A.136 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Sl. No. LHS Length in Sl. No. RHS Length in From To m From To m 96 38+110 38+200 90 96 33+680 33+710 30 97 38+280 38+330 50 97 33+850 33+870 20 98 38+350 38+400 50 98 33+890 33+930 40 99 38+450 38+460 10 99 34+640 34+650 10 100 38+480 38+490 10 100 36+140 36+210 70 101 38+510 38+540 30 101 36+230 36+280 50 102 38+560 38+570 10 102 36+340 36+360 20 103 38+660 38+670 10 103 38+200 38+210 10 104 38+680 38+770 90 Total Length in m 3190 Total Length in m 3620 Wilbur Smith Associates Pvt. Ltd. A.137 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 43. List of Public Water Sources along Link 5 Sl. Chainage Water Source Left/ Sl. Chainage Water Source Left/Right No. in km Right No. in km 1 0.23 Public water tap Right 31 22.0 Public water tap Left 2 0.98 Public water tap Right 32 22.0 Well Right 3 1.34 Public water tap Left 33 22.9 Well Right 4 3.16 Public water tap Right 34 23.13 Bore Well Right 5 3.27 Public water tap Right 35 23.2 Well Right 6 3.4 Public water tap Right 36 23.25 Public water tap Right 7 3.68 Public water tap Right 37 23.4 Public water tap Right 8 3.9 Public water tap Right 38 23.54 Public water tap Right 9 4.25 Public water tap Right 39 23.62 Public water tap Right 10 4.35 Well Left 40 23.75 Public water tap Right 11 6.05 Well Left 41 24.06 Public water tap Right 12 7.4 Well Left 42 24.32 Public water tap Right 13 7.77 Well Left 43 24.6 Public water tap Left 14 8.06 Well Left 44 25.42 Public water tap Left 15 8.1 Well Left 45 27.1 Well Right 16 9.6 Well Left 46 28.6 Public water tap Right 17 10.3 Well Left 47 28.74 Public water tap Left 18 11.05 Well Left 48 28.86 Well Left 19 11.06 Well Left 49 29.26 Public water tap Left 20 15.44 Well Left 50 29.47 Well Left 21 15.7 Well Left 51 32.24 Well Right 22 17.3 Tube well Left 52 34.65 Public water tap Right 23 19.34 Tube well Right 53 35.52 Public water tap Left 24 19.6 Public water tap Right 54 36.26 Public water tap Right 25 19.87 Public water tap Right 55 36.76 Tube well Right 26 20.92 Well Right 56 37.34 Public water tap Left 27 21.15 Public water tap Right 57 37.7 Well Left 28 21.6 Public water tap Left 58 38.08 Public water tap Left 29 21.8 Well Left 59 39.1 Public water tap Left 30 21.9 Well Right 60 39.62 Public water tap Right Wilbur Smith Associates Pvt. Ltd. A.138 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 44. Details Proposed Bus Stops and Bus Bays Locations Sl.No Chainage in km Side Sl.No Chainage in km Side 1 1+330 RHS 28 25+375 LHS 2 1+480 LHS 29 27+035 RHS 3 2+220 RHS 30 27+150 LHS 4 6+270 RHS 31 27+995 RHS 5 6+470 LHS 32 28+070 LHS 6 8+720 RHS 33 28+640 RHS 7 8+920 LHS 34 28+940 LHS 8 10+530 RHS 35 29+785 RHS 9 10+600 LHS 36 29+905 LHS 10 12+020 RHS 37 30+535 RHS 11 12+100 LHS 38 30+595 LHS 12 15+960 LHS 39 31+810 RHS 13 15+740 RHS 40 31+905 LHS 14 16+970 RHS 41 32+375 RHS 15 17+050 LHS 42 32+485 LHS 16 17+765 RHS 43 33+405 RHS 17 18+010 LHS 44 33+575 LHS 18 18+550 RHS 45 34+275 RHS 19 18+715 LHS 46 34+425 LHS 20 20+810 RHS 47 35+280 RHS 21 21+080 LHS 48 35+335 LHS 22 21+450 RHS 49 36+395 RHS 23 21+610 LHS 50 36+530 LHS 24 22+080 RHS 51 37+485 RHS 25 22+835 LHS 52 37+555 LHS 26 23+830 RHS 53 40+795 RHS 27 25+270 RHS 54 40+925 LHS Wilbur Smith Associates Pvt. Ltd. A.139 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 45. Sensitive Noise Receptors along Link 5 Sl No Design Chainage in km School/College Hospital 1 1+170 LHS 2 1+630 LHS 3 4+100 RHS 4 8+420 RHS 5 8+700 RHS 6 8+800 RHS 7 14+330 RHS 8 15+750 RHS 9 16+050 RHS 10 16+120 Both Side 11 17+500 RHS 12 18+350 LHS 13 21+000 RHS 14 21+550 RHS 15 23+620 RHS 16 25+050 LHS 17 25+570 LHS 18 27+080 RHS 19 27+200 RHS 20 27+850 RHS 21 27+950 RHS 22 30+530 LHS 23 33+850 LHS 24 40+740 LHS 25 40+880 RHS Wilbur Smith Associates Pvt. Ltd. A.140 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 46. Most Likely Flood Prone Sections along Link 5 Location Chainage in km Length (M) From To Kozha 10.8 10.9 100 Chenkallel 14.475 14.525 50 Veliyanoor 20.900 20.950 50 Arakuzha 32.050 32.150 100 Start of Muvattupuzha Municipality 40.000 40.050 50 Wilbur Smith Associates Pvt. Ltd. A.141 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 47. Water Bodies along Link 5, Impact, Mitigation and Enhancement Location Chainage Right Nature Of Water Enhancement /Left Body Action Kohza, 10.00 Canal/Perennial Visual integration Kohza(parallel & close to road) 10.06-10.12 Canal/Perennial Visual integration Marangattupally 11.4-11.95 Canal/Perennial Visual integration Marangattupallyse to road) 12.74 Canal/Perennial Visual integration Chenkallel 12.8-12.9 Canal/Perennial Visual integration Chenkallel (parallel & close to 14.5 Canal/Perennial Visual integration road) Monipally 15.84 Canal/Perennial Visual integration Monipally (parallel & close to road 22.92 Canal/Perennial Visual integration Karimpana 28.66 River/ Perennial Visual integration Karimpana (parallel & close to 28.9 Canal/Perennial Visual integration road) Aroor 31.5 River/ Perennial Wilbur Smith Associates Pvt. Ltd. A.142 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 48. Quarry and Borrow Areas near Link 5 Borrow area for Embankment/Subgrade Material: soil for embankment/subgrade are available from private sources within 3 to 6 km lead along the project road. Table 1: Details of Borrow Areas SL. No Quarry /Material Source Name Location/ District Side Lead 1 Vayala Vempally RHS 2 Pandapally Palakuzha RHS Approximately 3 Kaynad RHS about 3 to 6 km Maradi 4 Chulam LHS Metal Quarry for Coarse/Fine Aggregates- Metal quarry/aggregates and river sand available in the vicinity of the project road is summarized below - Table 2: Details of Stone and Sand Quarries Areas Quarry SL. Location/ Product /Material Lead No. District Material Source Name 1 Pakalomattom At Km 6+200 50 m from Chainage 6+200 on LHS Ordinary Sand 2 Pandapally Palakuzha 5 Km from chainage 30+000 on RHS M-sand 3 Vayala Vempally 5 Km from Chanage 4+000 on RHS 4 Pandapally Palakuzha 5 Km from chainage 30+000 on RHS 5 Arakuzha Meenkunnam 3 Km from chainage 34+000 on RHS Metal quarry 6 Kaynad 6 Km from chainage 38+000 on RHS Maradi 7 Chulam 5 Km from chainage 38+000 on LHS Quarry chart for the project road is given below. Wilbur Smith Associates Pvt. Ltd. A.143 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Figure 1: Chart Showing Row Material Sources Wilbur Smith Associates Pvt. Ltd. A.144 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 49. Material Sources Available near Link 5 Cement, Bitumen and Steel- Cement, bitumen, and Steel are the manufactured materials. Cement and steel with IS certification are available from nearby locality. Bitumen is available from refineries at Mangalore in Karnataka, with an average lead of 416 km to the start of the project stretch. Bitumen is also available from Kochi refineries which are about 95 km from the end of the project area. Wilbur Smith Associates Pvt. Ltd. A.145 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 50. Details of Likely Tree Removal along Link 5 Chainage (km) Categorisation of tress based on GBH < 0.3 m 0.3 - 0.6 m 0.6 - 0.9 m 0.9 - 1.8 m LHS RHS Total LHS RHS Total LHS RHS Total LHS RHS Total 0+000 1+000 0 2 2 3 0 3 3 2 5 0 0 0 1+000 2+000 0 0 0 0 3 3 1 1 2 1 0 1 2+000 3+000 0 0 0 0 6 6 0 8 8 0 1 1 3+000 4+000 5 2 7 9 0 9 5 1 6 3 3 6 4+000 5+000 2 0 2 5 0 5 0 0 0 1 0 1 5+000 6+000 0 0 0 1 2 3 1 1 2 1 0 1 6+000 7+000 3 0 3 1 1 2 4 2 6 0 0 0 7+000 8+000 0 2 2 0 0 0 0 0 0 0 0 0 8+000 9+000 4 1 5 2 0 2 2 0 2 0 0 0 9+000 10+000 0 2 2 3 0 3 1 1 2 3 0 3 10+000 11+000 4 1 5 0 5 5 5 0 5 1 0 1 11+000 12+000 1 3 4 0 1 1 0 1 1 0 0 0 12+000 13+000 0 0 0 4 1 5 3 0 3 1 0 1 13+000 14+000 0 2 2 0 3 3 0 0 0 1 0 1 14+000 15+000 2 3 5 4 4 8 2 3 5 0 1 1 15+000 16+000 4 2 6 2 0 2 14 1 15 4 1 5 16+000 17+000 3 0 3 8 0 8 5 0 5 2 0 2 17+000 18+000 0 0 0 1 2 3 1 1 2 1 2 3 18+000 19+000 0 0 0 0 1 1 0 4 4 0 0 0 19+000 20+000 0 0 0 0 0 0 1 3 4 0 5 5 20+000 21+000 0 0 0 3 0 3 0 3 3 0 1 1 21+000 22+000 0 0 0 0 3 3 2 0 2 0 0 0 22+000 23+000 0 4 4 0 2 2 1 0 1 3 0 3 Wilbur Smith Associates Pvt. Ltd. A.146 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Chainage (km) Categorisation of tress based on GBH < 0.3 m 0.3 - 0.6 m 0.6 - 0.9 m 0.9 - 1.8 m LHS RHS Total LHS RHS Total LHS RHS Total LHS RHS Total 23+000 24+000 0 6 6 0 0 0 0 0 0 0 0 0 24+000 25+000 0 0 0 0 0 0 0 1 1 0 1 1 25+000 26+000 0 17 17 0 7 7 1 0 1 0 2 2 26+000 27+000 0 0 0 0 5 5 1 1 2 0 1 1 27+000 28+000 0 0 0 2 1 3 0 6 6 0 2 2 28+000 29+000 0 0 0 3 1 4 2 2 4 0 0 0 29+000 30+000 0 2 2 1 2 3 1 1 2 0 0 0 30+000 31+000 1 0 1 3 0 3 0 0 0 1 0 1 31+000 32+000 0 11 11 0 3 3 0 0 0 0 1 1 32+000 33+000 0 7 7 2 2 4 0 0 0 2 1 3 33+000 34+000 0 0 0 2 0 2 2 1 3 2 2 4 34+000 35+000 0 0 0 0 0 0 1 0 1 0 0 0 35+000 36+000 0 0 0 0 11 11 1 0 1 0 0 0 36+000 37+000 0 0 0 0 1 1 2 0 2 0 1 1 37+000 38+000 0 0 0 0 0 0 0 1 1 1 0 1 38+000 39+000 0 0 0 0 0 0 2 0 2 0 0 0 39+000 40+000 0 0 0 2 0 2 0 0 0 0 0 0 40+000 41+000 0 0 0 3 0 3 1 1 2 3 0 3 Sub - Total 29 67 96 64 67 131 65 46 111 31 25 56 Grand Total 394 Wilbur Smith Associates Pvt. Ltd. A.147 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 51. Landscaping, Tree Planting and Environmental Enhancement Plan 1. INTRODUCTION In Kerala the pedestrian movements along the highways are very high but usually confined to village/ town and their movement is mostly from the house to the local market, schools, offices and back. Now the priority of Kerala should be to have wider safer roads with more attention to road safety. The unique nature of Kerala The clear absence of distinct boundaries separating village /semi- urban and urban areas is of prime importance in this regard. This is due to the fact that the ribbon development along roads of Kerala is more or less complete. Actually this is different from the normal ribbon development because the development is not only along the roadsides (linear/ribbon) but also everywhere in the low land (coastal) and midland areas. In the highland this is not observed because of the luxurious vegetation and plantations. Public owned trees unlike north Indian roads, very few trees exist on Kerala Roads. However along old roads, the numbers of large specimen trees is higher. These trees have been protected wherever possible with suitable changes in the design. Wherever such changes cannot be effected it may be necessary to remove them. Private owned trees The number of private owned trees to be acquired outside the right of way will be high compared to the public trees within the right of way. The private trees that will be affected during widening and improvement will be subjected to compensation at the appropriate market rates. In addition to this the project will plant three trees for every tree removed as a compensatory tree planting measure irrespective of the size, species etc. 2. ADVERSE EFFECT OF AVENUE PLANTING IN KERALA With 3000 mm average rainfall spread over 120-130 days of the year, trees along the roadside result in :-  Tree brances obstruct direct vision of drivers and can cause accidents. Some trees with huge canopy can cause a serious saftey hazard to passangers due to falling of branches.  The droppings from trees (leaves, flowers etc) which are seldom cleared from the surface of the roads will increase the damage to the wearing surface besides making the riding surface more slippery and cause accidents, especially when these materials decay.  The pavement being wet for longer periods due to reduced rate of evaporation by sunlight.  The growth of the tree roots will also damage the pavement.  Trees obstruct sight distances as well as the view of the natural landscape (Scenic beauty) like valley areas with lush green paddy fields bordered by back waters /lakes /ponds/ or green denuded hills particularly at dawn and dusk. This has more relevance when tourism potential of the State is considered. 3. TREE REMOVAL FROM THE AVAILABLE CORRIDOR OF THE ROAD The road widening under the Kerala State Transport Project (KSTP) will necessitate removal of large number of trees from the roadsides. The details of the tree removal from Link 5 are described in the following Table 1.0. The details of the tree removal are described in the EIA Wilbur Smith Associates Pvt. Ltd. A.148 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures documents as well as in the Environmental Management Plans available for Link 5. 3.1 ROAD SIDE AVENUE PLANTATION In the KSTP project corridors, there is no continuous avenue plantation. The trees within the available corridors are surveyed and tabulated in the respective management plans and summarised tree removal list for Link 5 is presented in Table 1.0. The common tree species found along the KSTP II link roads are Banyan trees, Tamarind, Jamun, Vaaka, Mahagony and Mango trees. The total number of trees to be removed from the link 5 road is estimated as 394 numbers for a length of 134.000 km. The tree removal is largely based on the road safety issues and partly due to the difficulties in the land acquisition process in Kerala. TABLE 1.0. THE DETAILS OF LIKELY TREE REMOVAL ALONG THE CORRIDOR (LINK 5) Sections Trees Having Trees Having Trees Having < Trees Having 0.3 0.6 to 0.9 m 0.9 – 1.8 m 0.3 m GBH to 0.6 m GBH GBH GBH Ettumanoor to Moovattupuzha 96 131 111 56 3.2 BENEFITS OF AVENUE PLANTING ALONG ROAD SIDES The following is an analysis to develop a Kerala specific tree planting plan. One of the objectives of planting trees on the roadsides is to produce a softer greener landscape, which is not relevant for Kerala. This is mainly because; just outside the right of way (ROW) the same type of thick vegetation exists on private property, almost continuously along the roadsides. The Second objective is to give shade to travellers. Thick vegetation already exists on private property and this need will be met to some extent, otherwise there shall be a determined effort to raise trees on the land-bordering the roadsides. The Third objective can be to absorb excessive noise. This is also not applicable in general as there is thick lush green vegetation all over Kerala along almost all roadsides. The Fourth objective is to raise social forestry; this is redundant in Kerala, as Kerala is covered by thick lush green vegetation. This coverage of trees has increased rapidly in the last 10 years, as the paddy cultivating lands turn evergreen (Cocus nucifera, Areca catechu, Mangiferous indica, etc) instead of seasonal green (Paddy cultivation). When the Paddy fields are converted a small percentage of the total area is actually converted to buildings but the remaining areas mostly support plantain, Cocus nucifera, Areca catechu etc. Most important is to uncompromisingly protect the remaining actual natural forest areas (flora and Fauna) and also to aggressively plant trees in any barren areas within the forest areas and also immediately adjacent to forest areas. The Fifth objective is to act as a natural filter to the traffic emissions. The roadside trees already exist outside of the right of way (ROW) and will act as the natural filter, hence this argument also not valid for Kerala. Tree planting control soil erosion and provide increased slope stability. This is true in the case of elevated areas of Kerala. This can be achieved by other engineering techniques such as retaining Wilbur Smith Associates Pvt. Ltd. A.149 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures walls, gabions, grass sods etc. The fact that most of the existing roads are already stabilised after years of monsoons is also not very much in favour of planting trees. 3.3 COMPENSATORY TREE PLANTING The compensatory tree planting strategy is based on the survival rate. The survival rate in Kerala is very high due to the favourable climatic conditions as evidenced by the existing biomass of the State. Public trees The project will plant at least thrice the number of trees that will be removed from the KSTP-II road corridors. The maintenance of compensatory planting for of project roads will also be considered. The total numbers of plants that will be necessary to be planted against the expected loss of 394 trees is about 1182 trees. The project however targets much higher planting rates along the numerous Oxbow lands available as a result of the road realignments (only at locations where considerable extent of area is available due to realignment). As an environmental enhancement measure the project will also aim to plant shrubs in and around the identified parking areas and Puramboke land. 3.4 SELECTION OF LOCATIONS FOR AVENUE PLANTATION Criteria adopted for selection of locations for avenue tree plantation is based on availability of land margin within PWD road boundary. Proposed RoW of this link road varies from min. 12m to max. 20m depending on the landuse pattern of the corridor. Hence an average of 15m RoW was kept for the entire road stretch to estimate the length of land available along the corridor. The Table 2.0 shows the length of road stretch having more than 3m PWD land width beyond 15m RoW identified for avenue plantation. Wilbur Smith Associates Pvt. Ltd. A.150 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures TABLE 2.0. CHAINAGE WISE LOCATIONS PROPOSED FOR AVENUE PLANTATION LHS RHS Sl. No. From To Length Sl. No. From To Length Sl. No. From To Length Sl. No. From To Length 1 0+230 0+250 20 71 19+440 19+450 10 1 0+380 0+570 190 65 19+170 19+200 30 2 0+360 0+400 40 72 19+480 19+890 410 2 0+600 0+610 10 66 19+280 19+390 110 3 0+590 0+620 30 73 20+160 20+190 30 3 0+830 0+910 80 67 19+420 19+460 40 4 0+650 0+660 10 74 20+230 20+370 140 4 1+040 1+050 10 68 19+560 19+670 110 5 0+960 1+170 210 75 20+650 20+700 50 5 1+170 1+190 20 69 19+750 19+800 50 6 1+480 1+590 110 76 20+830 20+840 10 6 1+310 1+320 10 70 20+220 20+270 50 7 1+650 1+660 10 77 20+860 20+870 10 7 1+730 1+740 10 71 20+360 20+370 10 8 2+080 2+370 290 78 20+950 20+990 40 8 1+820 1+830 10 72 20+560 20+590 30 9 2+570 2+830 260 79 21+490 21+520 30 9 2+010 2+030 20 73 21+400 21+460 60 10 2+910 2+930 20 80 21+640 21+650 10 10 2+170 2+180 10 74 21+760 21+790 30 11 3+110 3+180 70 81 21+970 21+990 20 11 2+230 2+320 90 75 22+560 22+600 40 12 3+210 3+300 90 82 22+040 22+100 60 12 2+420 2+890 470 76 24+190 24+200 10 13 3+380 3+390 10 83 22+130 22+490 360 13 2+940 2+980 40 77 24+420 24+430 10 14 3+570 3+630 60 84 22+550 22+640 90 14 3+120 3+160 40 78 24+610 24+620 10 15 3+690 3+710 20 85 22+700 22+750 50 15 3+310 3+370 60 79 25+460 25+510 50 16 3+760 3+790 30 86 22+970 23+030 60 16 3+400 3+430 30 80 25+560 26+060 500 17 3+920 3+990 70 87 23+150 23+170 20 17 3+880 3+900 20 81 26+610 26+630 20 18 4+260 4+270 10 88 23+300 23+510 210 18 4+870 4+880 10 82 27+330 27+360 30 19 4+760 4+840 80 89 23+800 23+840 40 19 5+530 5+540 10 83 27+380 27+390 10 20 5+210 5+400 190 90 24+630 24+730 100 20 6+130 6+150 20 84 28+100 28+130 30 21 6+070 6+150 80 91 25+410 25+420 10 21 10+390 10+420 30 85 28+250 28+420 170 22 6+820 6+850 30 92 25+570 25+580 10 22 10+550 10+600 50 86 28+720 28+730 10 23 7+070 7+120 50 93 25+750 25+960 210 23 10+780 10+790 10 87 28+860 28+890 30 24 7+600 7+620 20 94 25+980 26+070 90 24 10+810 10+940 130 88 29+120 29+360 240 25 8+770 8+780 10 95 26+310 26+390 80 25 11+000 11+090 90 89 29+510 29+590 80 26 9+420 9+430 10 96 27+470 27+480 10 26 11+110 11+130 20 90 30+280 30+350 70 27 9+760 9+800 40 97 27+900 27+910 10 27 11+260 11+360 100 91 30+450 30+680 230 28 10+600 10+610 10 98 28+040 28+080 40 28 11+610 11+670 60 92 30+720 30+810 90 Wilbur Smith Associates Pvt. Ltd. A.151 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures LHS RHS Sl. No. From To Length Sl. No. From To Length Sl. No. From To Length Sl. No. From To Length 29 10+730 10+750 20 99 28+180 28+210 30 29 11+880 11+920 40 93 30+930 30+960 30 30 11+040 11+070 30 100 28+230 28+260 30 30 12+000 12+020 20 94 31+480 31+510 30 31 11+150 11+680 530 101 28+370 28+470 100 31 12+080 12+090 10 95 32+090 32+140 50 32 11+780 11+810 30 102 28+700 28+820 120 32 12+140 12+180 40 96 32+170 32+210 40 33 12+410 12+540 130 103 28+880 28+890 10 33 12+620 12+800 180 97 32+260 32+570 310 34 12+890 12+910 20 104 28+930 28+940 10 34 13+120 13+240 120 98 32+820 33+070 250 35 12+990 13+000 10 105 29+280 29+520 240 35 13+560 13+580 20 99 33+220 33+290 70 36 13+120 13+220 100 106 29+560 29+600 40 36 13+630 13+670 40 100 33+540 33+550 10 37 13+570 13+590 20 107 29+620 29+630 10 37 13+690 13+700 10 101 33+610 33+670 60 38 13+790 13+820 30 108 29+650 29+730 80 38 13+730 13+770 40 102 33+920 34+280 360 39 13+870 13+900 30 109 30+150 30+160 10 39 13+790 13+810 20 103 34+300 34+320 20 40 14+100 14+190 90 110 30+180 30+450 270 40 14+130 14+160 30 104 34+410 34+520 110 41 14+230 14+270 40 111 30+480 30+630 150 41 14+180 14+190 10 105 34+560 34+630 70 42 14+460 14+520 60 112 31+850 32+120 270 42 14+510 14+530 20 106 34+700 34+720 20 43 14+570 14+580 10 113 32+170 32+180 10 43 14+890 14+900 10 107 34+800 35+140 340 44 14+900 14+950 50 114 32+220 32+660 440 44 15+130 15+200 70 108 35+380 35+400 20 45 15+670 15+790 120 115 32+720 32+730 10 45 15+300 15+380 80 109 35+900 35+990 90 46 15+820 15+840 20 116 33+370 33+380 10 46 15+600 15+640 40 110 36+010 36+100 90 47 16+080 16+170 90 117 33+730 33+760 30 47 15+670 15+680 10 111 36+300 36+310 10 48 16+250 16+270 20 118 33+830 33+840 10 48 16+190 16+240 50 112 36+380 36+390 10 49 16+510 16+540 30 119 33+880 34+230 350 49 16+290 16+360 70 113 36+660 36+680 20 50 16+680 16+710 30 120 34+260 34+280 20 50 16+480 16+490 10 114 36+980 37+000 20 51 16+740 16+760 20 121 34+400 34+420 20 51 16+560 16+640 80 115 37+080 37+110 30 52 16+900 16+930 30 122 34+500 34+520 20 52 16+730 16+750 20 116 37+230 37+550 320 53 17+010 17+120 110 123 34+540 34+550 10 53 16+830 16+840 10 117 37+700 37+770 70 54 17+230 17+240 10 124 34+730 34+770 40 54 17+000 17+030 30 118 37+820 38+080 260 55 17+270 17+280 10 125 35+900 35+910 10 55 17+050 17+060 10 119 38+120 38+170 50 56 17+510 17+520 10 126 36+110 36+260 150 56 17+690 17+700 10 120 38+210 38+280 70 57 17+670 17+680 10 127 36+500 36+510 10 57 17+720 17+730 10 121 38+350 38+510 160 Wilbur Smith Associates Pvt. Ltd. A.152 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures LHS RHS Sl. No. From To Length Sl. No. From To Length Sl. No. From To Length Sl. No. From To Length 58 17+740 17+780 40 128 36+650 36+660 10 58 17+820 17+830 10 122 38+570 38+640 70 59 17+820 17+910 90 129 37+650 37+660 10 59 18+150 18+160 10 123 38+660 39+090 430 60 17+950 17+970 20 130 37+830 38+330 500 60 18+210 18+280 70 124 39+210 39+370 160 61 18+050 18+070 20 131 38+420 38+430 10 61 18+330 18+340 10 125 39+400 39+670 270 62 18+220 18+250 30 132 38+460 38+470 10 62 18+360 18+420 60 126 39+730 39+820 90 63 18+270 18+280 10 133 38+500 38+560 60 63 18+510 18+520 10 127 40+270 40+340 70 64 18+320 18+350 30 134 38+670 39+110 440 64 18+990 19+080 90 Total Length in m 9250 65 18+430 18+490 60 135 39+350 39+360 10 66 18+820 18+990 170 136 39+470 39+510 40 67 19+030 19+040 10 137 39+600 39+610 10 68 19+090 19+100 10 138 39+680 39+700 20 69 19+110 19+120 10 139 39+940 40+010 70 70 19+340 19+390 50 140 40+290 40+340 50 Total Length in m 10100 Wilbur Smith Associates Pvt. Ltd. A.153 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 3.5 SELECTION OF TREE SPECIES FOR PLANTING This aspect is a bit contentious with regard to the roadside plantations especially the planting of fruit bearing trees along the roadsides. In the case of the Kerala State Transport Project, the tree planting area is mainly away from the actual road corridor along oxbow lands. However planting of fruit bearing trees are not recommended as it may create any problem for the road traffic. The table 3.0 and 4.0 are the common trees recommended and that can be planted along the sides of the roads. The distance and the space available is also a problem in Kerala. Further, the two species of Banyan trees i.e. the Ficus religosa and Ficus bengalansis are generally not recommended due to its irregular uncontrolled growth and also because of its religious association. Actually religious association is an environmental friendly positive aspect against tree cutting. Over a period of time if the road authority wanted to widen the road it may be difficult to remove religious trees. The situation is better in Kerala, as the attitude of the public is different. The fruit bearing trees are usually attracted by children and hence could lead to accidents. The other side is that with the development going faster the fruits and nuts available for the birds and animals like squirrel are very less. The roadside fruit bearing trees normally helps the birds, animals, and lead to a nesting of birds etc. For this to be effective there shall not be any harvesting in certain declared areas. In these areas the Indigenous species are always preferred against the exotic species. The recommended species are the same as that of the occurring species except the Peepal and banyan trees. The indigenous species recommended are shown in Table 3.0 and 4.0. 3.6 TREE PLANTING ALONG OXBOW LANDS In rural areas, it is an accepted fact that the improvement of roads will result in the formation of numerous 'oxbow lands' all along the mid lands and in the highlands. The oxbow lands are the existing roads where the road realignments are proposed with abundant PWD land is available. This is similar to the OXBOW LAKES formed during the evolution of rivers hence the name for easier identification for environmental management. This is in general not true in the case of the coastal area. The coastal Kerala is generally plain and hence all roads evolved in this area are generally straight. TABLE 3.0. COMMON AVENUE TREES TO BE PLANTED WITHIN THE PURAMBOKE LAND AND ‘OXBOW LANDS’ Sl No Botanical name Common Name 1 Samnea saman Rain tree 2 Spathodea campanulata Tulip tree 3 Tamarindus indica Tamarind 4 Butea monosperma Flame of the forest 5 Delonix regia Raf Gulmohar 6 Melia azaderach Linn Bead tree 7 Michelia champaca Champakam 8 Holarrhena antidysenterica Kudakapala 9 Peltophorum pterocarpum Backer Rusty shield bearer 10 Cassia fistula Linn Kanikkonna 11 Jacaranda mimosifolic Jacaranda 12 Delomix regia Gulmohar 13 Polyalthia longifolia Var Pendula Asoka Wilbur Smith Associates Pvt. Ltd. A.154 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures TABLE 4.0. SHRUBS TO BE PLANTED WITHIN THE PURAMBOKE LAND AND ‘OXBOW LANDS’ Sl No Scientific Name of Shrubs 1 Aerva javanica 2 Aerva pseudotomentosa 3 Cassia auriculata 4 Clerodendron phloemoides 5 Crotolariaburhia 6 Capparis aphylla 7 Calotropis procera 8 Calligonum polygonoides 9 Euphoria bivula 10 Grewia tenex 11 Indigifera argentina 12 Laptadenia pyrotechniea 13 Ziziphus spp. 14 Cazzia Amriculata 15 Medicinal Plants (Source: Kerala Forest Development Corporation, Consultants) The importance of the proper management of these oxbow lands is there for an unavoidable outcome of the project. There were many alternatives available for the highway authority. Tree planting all along these oxbow lands could be very useful for the environmental enhancement of the region. This will help positively for tourism industry. The Oxbow lands along the corridor are presented in Table 5.0. Length of the Oxbow land may change depending on the final alignment for development. The plants indicated in Table 3.0 and 4.0 are the most acceptable local trees and shrubs. In all oxbow land both shrubs and trees are required. TABLE 5.0. OXBOW LAND ALONG ETTUMANOOR - MOOVATTUPUZHA CORRIDOR Chainage (km) Length Location Right /Left Proposed Treatment Start End in m Name of Oxbow land Enhancement 31+300 31+700 400 Areekuzha Right A In urban areas the oxbow lands will serve as local service roads for the local vehicles. This also requires tree-planting depending on the length of the urban area and the length of the oxbow land. 4. SOCIAL ACCESSIBILITY OF OXBOW LANDS Oxbow lands are proposed to be developed in three categories. Type-A, Type-B and Type-C. Where a considerable extent of area is available due to realignment, Type-A and Type B category of oxbow land is proposed to be developed. The approximate cost for such oxbow lands is estimated to be around Rs.30,00,000 included in Environment Cost, which will be incurred by KSTP. At minor realignment locations with considerable extent of area is available due to realignment, Wilbur Smith Associates Pvt. Ltd. A.155 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures where the land to provide parking space for vehicles is scarce, only landscaping is provided to improve the aesthetics of the road and also with environmental considerations. This type of oxbow land is categorised as Type-C and the cost estimated for such type is around Rs. 2,00,000, which will be incurred by Contractor . As GoK is yet to identify a socially, environmentally and economically viable development proposal for oxbow lands which need inter departmental collaboration and coordination, the oxbow land development is not included as part of the BOQ of this project and can be implemented as a separate activity. However, tree planting and other general landscaping works in locations where sufficient land is not available for oxbow developments (Type C) are included in BOQ. Locations of oxbow lands for this link corridor are identified and presented in Table 5.0. Since, Type A oxbow land is separately developed by KSTP, cost for same is considered in Table 6.1 Environmental budget to be incurred by KSTP of EMP report. 5. PLANTATION SPECIFICATIONS 5.1 DETAILS OF NURSERIES Kerala Forest Development Corporation (KFDC) has facilities for raising nurseries at various places as shown in Table 6.0. Depending on necessity, nurseries can be raised in nearby private lands taken on short-term lease by KFDC. TABLE 6.0. LOCATION OF NURSERIES Sl.No District Location 1 Kollam Arippa 2 Kollam Kandanchira 3 Kottayam Nagambadam 4 Thrissur Payyannur 5 Palakkad Silent Valley 6 Palakkad Malampuzha 7 Wayanad Kambamala 5.2 ADDRESS OF CONTACT PERSON Divisional Manager, KFDC Ltd., Thycaud. P. O., Thiruvananthapuram. Phone: 320604 Divisional Manager, KFDC Ltd., Tholicode. P. O., Punalur, Phone: 222316, 222317 Divisional Manager, KFDC Ltd., 1/702, Chintha, Kannimangalam. P. O., Thrissur, Phone: 0487 – 427433, 443189 Divisional Manager, KFDC Ltd., Rethi Mandiram, Chemmenthodu, Pothundi. P. O., Nemmara. Phone: 0492 – 344332. Divisional Manager, KFDC Ltd., Munnar - 685612.Phone: 0486 30332 Divisional Manager, KFDC Ltd., House No: VIII/408. A, ‘Love Dale’, Padma Prabha Road, Kalpetta, Wayanad - 673121. Phone: 0493 – 605821 5.3 COST OF TREE PLANTING PLAN It is preferable to use tall seedlings for avenue planting. It is suggested that one-year-old nursery seedlings raised in poly bags be used for the purpose. The approximate cost of a seedling is Rs. 15/-. The total cost will be about 1182 x 15 = Rs 17,730/- Wilbur Smith Associates Pvt. Ltd. A.156 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures 5.4 COST OF TRANSPORTATION An average amount of Rs. 25/- per plant may be provided for loading, transportation, unloading etc. This will be about 1182 X 25 = Rs 29,550/- 5.5 COST OF LABOUR CHARGES AND MATERIALS This includes, site clearance, pitting, providing compost in the pit, filling the pit and making planting holes, planting the seedlings, weeding as and when required, replacing the causalities, application of bio fertilizer and bio pesticides, providing tree guards and ward. An amount of Rs.620/- per plant is required for the above purpose. This will be about 1182 X 620 = Rs.7,32,840/-. 5.6 COST OF MAINTENANCE FOR THE FIRST, SECOND AND THIRD YEAR The operations involve replacing the causalities, weeding as and when required, application of bio fertilizer and bio pesticides, repair of tree guards, watch and ward and other plant protection measures. These operations may require 1182 X 80 = Rs.94,560/ per year during 1st, 2nd and 3rd year. 5.7 FRUIT BEARING PLANTS Fruit bearing plants are not recommended for planting as planting such trees result in social and traffic problems involvement in protecting them. If planted, local people will have full access to the use of fruits from these plants. However, some of the fruit trees like Syzygium cuminii and Phylanthus emblica which are medicinal in nature can be planted without such issues and some others like Artocarpus heterophyllus which provide valuable timber along with fruits are not suitable for planting along road side. 6. MONITORING FORMATS Monitoring may be done on a monthly basis using the format given in Table 7.0. TABLE 7.0. MONITORING FORMAT REMARK ON NO. OF PLANTS SPECIES NO. OF PLANTS AVERAGE GENERAL LOCATION SURVIVING AND PLANTED PLANTED HEIGHT HEALTH OF PERCENTAGE PLANTS 7. BIO MANURE Bio manures like compost, neem cake, Azatobactor are recommended instead of chemical fertilizers to make the scheme more eco friendly. About 10 gm Azatobactor together with 250 gram of neem cake or compost shall be used at the time of planting and as part of 2nd and 3rd year maintenance. Neem cake will also function as bio pesticide. Compost can be made from green leaves, coconut husk or urban waste materials. Normally the tree species suggested do not suffer from attack of pests and application of neem cake can be very effective prophylactic treatment. 8. MULCHING AND PRUNING Wilbur Smith Associates Pvt. Ltd. A.157 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Mulching at the end of monsoon shall be done with coconut husk, grass or green leaves after under taking a soil working around the plant in order to conserve moisture. Frequent watering of trees shall also be carried out to protect them from severe summer. Pruning of branches during 2nd and 3rd year shall be carried out to ensure proper stem formation and to ensure that the branches will not obstruct the traffic on the road. 9. PURAMBOKE LAND In order to protect trees in Puramboke land, it is necessary to provide barbed wire fencing with four strands. The cost of planting decreases with size of land available. The cost of planting trees and shrubs and maintenance is approximately as follows. 1st year Rs. 60,000/- per ha. Including fencing 2nd year Rs. 15,000/- per ha. 3rd year Rs. 10,000/- per ha. For making an estimate a maximum of one hectare of Puramboke land is considered per Link. The necessary budget for this is Rs 85,000/- (Rupees eighty five thousand only) per link. 10. PAYMENT SCHEDULE The major portion of the expenditure is at the pre planting and planting stages. Plantation will be carried out by the project Contractor with first year maintenance and cost for the same is considered in BOQ. Second and third year maintenance will be carried out by Contractor appointed by KSTP. 11. NOISE BARRIER Although dissipation of complete noise is expensive and difficult to implement, some cost effective methods can be employed to reduce the noise level considerably. In order to create a healthy noise barrier the following considerations would help. The species selection should be very careful. The selected species should have small but presence of innumerable green leaves each small leaf acting as noise attenuator. The space available between the school or silence zone and the road corridor could be the deciding factor. The number of rows required creates an effective noise shield for the given circumstances. This actually depend on the space available between the road corridor and the building The design provided is an ideal situation especially with regard to the location of school gate, assembly area, and tree planting area (one row of tree completely sealing the entry of direct noise). The school activity area (ground for daily assembly, prayer meetings etc) should be planned away from the main high traffic road. This is applicable as guideline to new schools. The School gate should be away from the main traffic road. If the situation does not permit the gate should be in any corner in such a way that the noise effect from the main road is minimum. The planting within the ROW is not shown in the design layout. If situation permits this will add to the noise barrier and in fact effect increase to many fold because of noise first striking the Wilbur Smith Associates Pvt. Ltd. A.158 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures trees (ROW) and Wall) and then before sound waves reach the tree barrier it has to pass through an open air area. The noise effect will be like that shown in the design from the road towards the building. The species recommended for the tree planting is Saraca asoca (Asoka tree). However depending on the situation any trees with numerous relatively small leaves will be ideal. The detailed design for the noise barrier is provided in the design drawings. Refer DPR Drawing No. EM-1D-60-008. 12. LINK SPECIFIC ACTION PLAN FOR TREE PLANTING 12.1 TREE PLANTING AWARENESS CAMPAIGN An Environmental Monitoring Unit (EMU) under the Public Works Department (PWD) at Thiruvananthapuram will take up this activity coordinating with local Engineers of each affected district for Panchayat level awareness meetings. The Environmental Officer will be solely responsible for the various activities. The EO needs to identify and invite the local people to participate in the programme. The parties to be invited include 1) Representatives of parents, Students and teachers of the Schools and other educational institutions bordering the Project road 2) Forest officials - They will supply seedlings of the appropriate varieties to the local people and to the schools for planting. 3) Project Management Team (PMT of PWD) members 4) PWD local Staff 5) NGOs in the region as listed in the Project documents. If the local NGOs are not suited, the EO can select the most appropriate NGOs as the credibility of all NGOs can only be evaluated by their past activities. 6) Private Nursery owners 7) Panchayat representatives Nurseries The forest nurseries of the Social forestry wing of the Department of Forests and Wild Life and also Kerala Forest Development Corporation (KFDC) will provide the seedlings on a continuous basis. Frequency of meetings There should be at least four meetings at local Panchayat levels per year to evaluate the programme after planting of the trees. The meeting shall be attended by representative of school children’s and teachers at all levels of education in addition to Panchayat Authorities. The PWD at State level should organize television and radio programmes in the local language. Sources of Funding Tree plantation cost is already included in the Contractor cost which is part of bid document, which also includes the planting for noise barriers. Contractor will carry out planting trees along the corridor as and when the road construction is complete. This way, survival rate of trees can be ensured. The rest has to be raised locally. In Kerala, the panchayath authorities can provide local funding for organizing these meetings and action plans. The project provision for noise barriers also provides funding for schools and hospitals. 12.2 THE IDENTIFIED TREE PLANTING AREAS ALONG KSTP Wilbur Smith Associates Pvt. Ltd. A.159 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Puramboke land: The Puramboke lands need to be identified after the construction is complete. It is estimated that considerable area will be available along the road ROW without creating any road safety issues. This will be available in patches only. The EO will be responsible for this work. This cannot be identified at this juncture because of the non-availability of legal Right of Way and the Contractors final choice of alignment based on the practical difficulties in running the equipment and machineries. The area could be useful for tree planting as well as parking areas and servicing areas. For making an estimate a maximum of one hectare of Puramboke land is considered per Link. Oxbow land The KSTP II Oxbow lands are identified in the link specific EIA report as well as this annexure in the Table 5.0. 13. CONCLUSION & POLICY RECOMMENDATIONS 13.1 CONCLUSIONS Along high priority roads, roadside planting should not be encouraged because of the narrow and winding nature of corridors coupled with other vegetation and climatic factors. In general, considering the special condition of State roads, the roadside trees will increase the accident rates and their severity. Not only the vehicles but also the pedestrians are at an unacceptably high risk in Kerala. The policy is not applicable to National Highways of the State as the Standards are better with very high safety standards. More over the roads are built very wide and straight. The main highways are located in the coastal plains of Kerala. The project is committed to plant a minimum of 1182 trees as against the removal of 394 trees from the high priority as well as maintenance corridors including the removal of private trees while widening. The scope of the planned KSTP I planting will be many times higher than the minimum requirement. The entire budget although included in the BOQ will be sub contracted separately with an agreement with Kerala Forest Development Corporation. 13.2 RECOMMENDATIONS After the construction of the road, there should be a determined effort to persuade the landowners on both sides to plant shade trees along safe sections and to discourage at unsafe sections. This activity shall be at micro level i.e. at the Panchayat or village level with people's involvement. The household should know why these activities are required. There should be a determined effort by local schools, hospitals, Panchayat Municipal and Police authorities towards this. The ESMU will take up this activity for further follow up with a definitive action plan. The strategy discussed is a general approach, depending upon the local situation; there can be variations. Tree planting however should be considered in all 'Puramboke land' outside the required corridor so as not to interfere with the smooth and safe flow of traffic. In the case of Kerala State Transport Project (KSTP) the main areas for tree planting are the so Wilbur Smith Associates Pvt. Ltd. A.160 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures called 'oxbow lands’ as the Puramboke land will be mostly utilized during the proposed improvement works. The oxbow lands shall be leased to NGOs preferably woman NGOs or to families in the immediate vicinity as an income generating activity involving BPL5 families. PWD will have to develop a monitoring mechanism for the oxbow lands during operational stage to have an excellent control on the land and resources. PWD should consider the employment of local people for planting. Notes: This recommendation does not affect the existing trees. Wherever possible, the existing trees have been protected by making necessary design changes. 5 Below Poverty Line Wilbur Smith Associates Pvt. Ltd. A.161 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 52. Auto-Jeep- Tempo -Taxi Stands – Existing and Proposed Locations of Existing Parking Areas Sl Design Chainage Side Type of Vehicle Remarks No in km 1 4+620 RHS Auto Rikshaw Existing will be Integrated 2 6+630 RHS Auto Rikshaw Existing will be Integrated 3 8+850 LHS Auto Rikshaw Can be shift to this Location 4 9+560 RHS Auto Rikshaw Can be shift to this Location 5 12+230 LHS Auto Rikshaw Existing till te Integrated 6 25+150 LHS Auto Rikshaw Can be shift to this Location 7 36+470 RHS Tempo Can be shift to this Location 8 40+900 RHS Auto Rikshaw Can be shift to this Location Proposed New Vehicle Parking Area Sl Design Chainage in Side Type of Vehicle Remarks No km 1 3+750 LHS Auto & Taxi 2 4+700 LHS/RHS Auto & Taxi 3 20+700 LHS/RHS Auto 4 24+440 RHS Auto 5 25+150 LHS Auto Newly developed parking area 6 36+300 LHS Auto & Taxi 7 40+550 LHS Auto & Taxi 8 40+700 RHS Auto & Taxi Wilbur Smith Associates Pvt. Ltd. A.162 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 53. Listed NGOs in the Region Sl. Name Of NGOs Contact Address Activities No. Person & Phone Number 1. Asoka Trust for Ecology Ammankovil Street, Mullackal, Activities in areas of environment, and Environment(ATREE) Alappuzha, Kerala consultancy project, rural technology , Director R&D 2. Bodhana Bodhana, Thiruvalla Promotes grass roots level Director Phone: 04692730561 organizations and undertakes development programmes sponsored by the Central and State Governments 3. society for economic and S.L.puram P.O Activities include income generation, environment development Alappuzha housing (SEED) 4. Kodumon Grama Vikasana Aycadu, Kodumon. P. O., Promotes social development of the Samithy, Contact person: Pathanamthitta-691555 poor and the needy Kunjannamma Kunju 5. Pathanamthitta Pathanamthitta Naranganam Promotes social development of the Naranganam Rural Rural Development Socety, poor and the needy Development Socety, Naranganam west Secretary P.o,Pathanamthitta-689 642 6. Kodumon Grama Vikasana Aycadu. P. O., Kodumon, Activities in the areas of fund Samithy, Contact person: Pathanamthitta-691555 disbursement, field implementation, Prof. Mony Thomas Tel: 0473-485214 micro-credit 7. Pazhakulam Social Service Pazhakulam. P. O., Adoor, Activities in the areas of housing, Society ,Secretary Pathanamthitta-691527 micro-credit, disaster management Tel: 0473-422262 8. Centre for Development Vikas Institute, Kanakkari. P. Activities include pollution, rural Action O., Kottayam-686632 technology, income generation, , President Tel: 0481-537917 enterprise development 9. Gramin Udyog Yojana Vikas Works Compound, Provides vocational training facilities Contact person: Near petrol pump, Erumely, for unemployed and poor people, Kurian Thomas Kottayam-686510 designs and implements programmes for employment generation in rural areas and promotes the welfare of the weak and disabled persons 10. Malanad Development Kanjirappally, Charity based social service Society,Contact person: Kottayam-686507 organization, promoted the general Mathew Vadakkemuriyil welfare of the poor 11. Society for Integral Koovapally, Kottayam Promotes social development Development Action Contact person: George Thomas 12. Friends for Social Justice Parathodu. P. O., Activities in the areas of income Contact person: Kanjirappally, generation V. Prabhakaran Nair, Kottayam-686543 President Telephone: 0482-802959 13. Angadical Social Service Angadical Social Service Activities in the areas of housing, Centre, secretary Centre, Reg. No. P. 224/87, micro-credit, disaster management Paranth House, Angadical North, Kaipattoor, Pathanamthitta Wilbur Smith Associates Pvt. Ltd. A.163 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 54. Environmental Enhancement Drawings The Environmental enhancement drawings attached per table 1 are typical design drawings prepared for specific cases. These drawings clearly provide the concept for the preparation of other design drawings. In the case of oxbow lands (Original alignment of Realignment sections with considerable extent of land available to develop oxbow land) these drawings are to be approved by the PMT and Environmental Management Unit (EMU). They should review the improvement plans, case-to-case based on the Local, Regional and State interests. The attached design drawings are typical deigns for parking areas, bus bays and tree planting etc and are not site specific. These drawings also include the concept of Typical Noise barriers developed by the project for consideration at the identified Silence zones. The details of these drawings are given below. TABLE 1.0. ENVIRONMENTAL ENHANCEMENT DRAWINGS SL DRAWING LOCATION IF ANY DETAILS OF THE DRAWING REMARKS NO NUMBER 1 EM 1D 60-008 Typical and is not Typical design of noise barrier in front All dimensions are in location specific of a school consisting of a stonewall mm otherwise specified. and green barrier 2 EM 1D 60- Typical and is not Typical design for parking area along Number of slots varies 003 location specific oxbow land according to the length of oxbow land 3 EM 1D 60-004 Typical and is not Parking area for autorickshaws. Arrows All dimension are in location specific shows movement direction of vehicles. metres unless otherwise specified. 4 EM 1D 60-005 Typical and is not Parking area for taxi cars, arrows All dimension are in location specific shows movement direction of vehicles. metres unless otherwise specified. 5 EM 1D 60-007 Typical and is not Typical layout of partial bus bay in All signs shall be as per location specific urban area IRC.67.2010 All markings shall be as per IRC.35.2010. All dimension are in mm unless otherwise specified. 6 EM 1D 60-009 Typical and is not Typical design for bus waiting shed All dimension are in mm location specific with kiosk unless otherwise specified. 7 EM 1D 60-011 Typical and is not Schematic drawing of catch drain and All dimension are in mm location specific oil interceptor unless otherwise specified. 8 EM 1D 60-012 Typical and is not Typical drawing of sedimation trench, All dimension are in mm location specific storm water drain and green belt unless otherwise specified. 9 EM 1D 60-013 Typical and is not Typical drawing of contour trench All dimension are in mm location specific unless otherwise specified. The concept of Noise barrier design: The design drawing is an ideal condition, which rarely meets in its perfection in the location. The detailed guidelines are given in the Annexure 3.8. Wilbur Smith Associates Pvt. Ltd. A.164 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures The concept of Noise barriers is as follows: 1) The design provided is an ideal situation especially with regard to the location of school gate, assembly area, and tree planting area (three rows of trees completely sealing the entry of direct noise. 2) The school activity area (ground for daily assembly, prayer meetings etc) should be planned away from the main road. 3) The Schools gate should be away from the main traffic road. If the situation dose not permits the gate should be in any corner in such a way that the noise effect from the main road is minimum 4) The planting within the ROW is not shown in the design layout. If situation permits this will add to the noise barrier and in fact the noise attenuation effect increase to many fold because of noise waves (energy waves) first striking the trees within the ROW and then the Wall and later sound waves reach the tree barrier. In the whole situation noise has to pass through a column of air also. The effect of noise will be like that shown in the sketch below from the road towards the building. 5) The species recommended for the tree planting is given in Table 3.0 in Annexure 3.50. Polyalthia longifolia Var Pendula (Asok tree) is ideal for noise barrier. However depending on the situation any trees with numerous relatively small leaves could be ideal. Road-- >wall under atmosphere- > Asoka trees-> atmosphere--> Building Wilbur Smith Associates Pvt. Ltd. A.165 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 55. Spoil and Scarified Material Disposal Plan for Link 5 The following specific scenario is worked out to deal with the scarified material collection and disposal assuming that the entire length of link 5 road as overlay considered Total scarified material available = 41,394.7 m3 Total spoil material collected from excavation = 105,897 m3 The entire material will be required for base filling of the corridor and parking areas. The topsoil in all cases is about 50 cm. This will be removed and heaped to use for productive purposes. The total fill material required would be 50cm pit developed after the topsoil removal and additional 50 cm new scarified material would also be filled in the case of new alignments. The mass balance would be achieved by filling along new alignments and also along the construction alignments for access roads etc. The total material required will be almost the same as that of the material available. Since the entire area is low land to midland, the scarified material will be required along the edges of the corridor. The detailed plan should be in conformity with the Construction scheduling prepared by the PMT. The Contractor will have to obtain approval from the Engineer regarding Contractors plan to use the material. Wilbur Smith Associates Pvt. Ltd. A.166 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures Annexure 3. 56. Cultural Properties Rehabilitation Measures The project needs to develop measures for the rehabilitation of cultural properties that will be affected by the road improvement programme. This could be made a part of the broad R&R Principle and Policy Framework. The Environmental Budget with in the EMP will undertake the environmental enhancement and landscaping where as any land acquisition and rehabilitation will be part of the Resettlement Action Plan. The KSTP has been guided by the Bank’s Draft Operational Policy 4.11, which exclusively deals with the cultural properties, in its handling of the affected cultural properties due to the project. Further, as desired by the Bank, this section of the EMP and RAP has been prepared as a separate safeguard measures exclusively for the Kerala State Transport Project. What Does Cultural Property Mean? The United Nations term “Cultural Property� includes sites having archaeological (prehistoric), palaeontological, historical, religious, and unique natural values. Cultural Property, therefore, encompasses both remains left by previous inhabitants, for example, middens, shrines, and battlegrounds) and unique natural environmental features such as canyons and waterfalls. The rapid loss of cultural property in many countries is irreversible and often unnecessary. Detailed background information on all aspects of this note are contained in the technical paper of the same title, available from the office of Environmental and Scientific Affairs, Project Policy Department of UN, which is ready to provide assistance on request. Source: World bank Draft OP 4.11 1. TYPES OF RELIGIOUS PROPERTIES IDENTIFIED IN THE PROJECT LOCATION The environmental and social surveys and the detailed social impact studies have identified all cultural properties (total 13 Nos) that will be affected by the Link 5 road. These are presented in Table 2.0. Their magnitude of being affected widely varies. The following types of cultural properties are found on the project roads: 1. Temple 2. Church 3. Mosque 4. Shrines of all the three major religions 5. Tree shrines/sacred groves 6. Roadside hyundi (money collection box) of all the three religions Except the tree shrines, the others are not strictly “common property� because they are owned and managed by their respective registered “Society� or “Trust�. The public only has access to them. As the table shows, there are 3 Hindu cultural properties, 8 Christian and 0 Muslim religious properties are present along the project road. Few cultural properties have encroached on the Government land (need to wait till RAP is compete). There are two road side shrines are present. Most of the 100% affected properties are hyundi, which are also encroachers and could be easily relocated. Other properties are affected in terms of losing boundary walls or land. 2. DEFINITIONS Shrines are usually small structures, located in the vicinity of the main religious structure associated with all the three major religions of the State. The shrines usually serve the purpose of helping the road users obtain a quicker religious service, besides indicating the larger presence of the religious community in the locality. Wilbur Smith Associates Pvt. Ltd. A.167 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures The shrines are a most important part of any place of worship. Normally a small shrine develops to a bigger place of worship with earlier shrine remaining as the most important part of the property. Temples are Hindu places of worship. There are private as well as community temples. Most of the temples are different from one another by way of age and idols (Shiva, Vishnu, Krishna etc). In a majority of the cases, the location has specific significance. Because of the same reason temples are usually located away from the Roads. Churches are Christian places of worship. There are no private Churches. The churches usually belong to different groups within Christianity (Catholic, Marthoma, Syrian, Pentecostal, etc). Except few cases the location has no specific significance for a church. Mosques are the places of worship of the Muslims. There are Sunny Mosques and Mujahiddin mosques. With regard to the rehabilitation policy, all mosques can be treated as belonging to the same type. There are no known location specific mosques in the project location. Tree shrines are usually associated with the Hindus. There are a few tree shrines located along the project roads. People worship the idols installed at the base of the trees as well as the trees. These trees have a special significance to the local community, which will usually oppose the removal of such tree shrines. The landscaping would be ideal. This will require extensive community consultation. Sacred groves are also usually associated with the Hindus. Even today, the Nair community in Kerala worship snakes and other demigods. For this purpose they preserve a small forest, known as sacred groves. This represents the close association of man with nature. Usually, landscaping would be ideal for the sacred groves. Hyundi: these are box shaped structures of masonry work for money collections, maintained by the institutions of all the three major religions throughout the State. These are usually of one square metre area, placed strategically on the public right of way, essentially targeting the truck drivers and other motorists who do not have the time to visit the places of worship. Direct Impacts: The direct impacts to the cultural properties are of the following category. 1. Only Compound wall affected 2. Compound wall and part of the compound affected 3. Part of structure affected 4. Sanctum sanatorium affected – can be categorised as the complete structure affected 5. Only land affected 6. Complete cultural property affected 7. Loss of access/entrance, if the existing access is from the project roadside. Project Approach: In all cases, the mitigation actions are framed unique to that particular situation with respect to the available space, the unique characteristics of the religious structure affected and the local public and religious judgment. In other words, the project policy is unique to consider the widely varying situations for each cultural property. Impact Mitigation: The loss of land and assets of the cultural properties will be treated on par with the loss of other land and assets for the purpose of compensation and assistance. Wilbur Smith Associates Pvt. Ltd. A.168 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures However, the project will, in addition, strive to enhance benefits to the affected cultural properties in consultation with their respective management/ Owners. The project has a clear strategy to take people and affected parties in to confidence before taking any decision on shifting of structures especially religious structures. In general there would not be any involuntary shifting or relocation especially in the case of cultural properties. An outline benefits enhancement for the cultural properties is shown in the following Table 1.0. TABLE 1.0. STRATEGY FOR RESTORATION, RELOCATION OR RECONSTRUCTION OF CULTURAL PROPERTIES EXTENT OF IMPACT ON IF CONSULTATION CONDUCTED CONSENSUS BENEFIT SL CULTURAL PROPERTIES OBTAINED ENHANCEMENT NO. 1 Only Compound wall and Reconstruction of wall parallel to the present Access/entrance land beneath affected compound wall. Loss of land compensated. provided through one of the sides 2 Compound wall and part of Reconstruction of wall parallel to the existing compound affected wall. Loss of land compensated. If land is - Do - available adjacent to the property, will be purchased. 3 Structure affected Alternate structure constructed and all pre-status - Do - restored. 4 Sanctum sanctorum affected Complete structure reconstructed and all pre- - Do - status restored. 5 Only land affected Alternate land provided, preferably, if available, -Do- adjacent to the existing location. 6 Complete cultural property Relocation of site identified by the cultural affected property authorities and rebuilding of the -Do- property. 3. OTHER IMPACTS TO CULTURAL PROPERTIES INCLUDE: Indirect/Induced impacts: The construction of road or realignments or bypasses sometime will result in induced impacts obstructing the cultural properties in various ways. In the instances of such events the highway authority will assist through consultation and other means (Highway Protection Act, 2000) restoring the importance of the shrine. This will be mostly applicable along the new alignments. 4. CULTURAL PROPERTY REHABILITATION ACTION PLAN The Rehabilitation Action Plan include environmental enhancement, design changes to save the structure from being affected. The project team further visited the site in August 2001 for three days from 27-08-2001 to 29-08-2001 to ascertain type of the impacts and also to devise typical designs for cultural property enhancement. It was also planned to make design changes or adjustments to save the cultural properties from being affected. 5. CULTURAL PROPERTY IMPACT ASSESSMENT, MITIGATION AND ENHANCEMENT PLAN The cultural properties that will be affected by the Link 5 improvements are shown below in Table 2.0. Wilbur Smith Associates Pvt. Ltd. A.169 Kerala State Transport Project Public Works Department Kerala State Transport Project II Draft EMP for Ettumanoor – Moovattupuzha Road Annexures TABLE 2.0. CULTURAL PROPERTY IMPACT ASSESSMENT, MITIGATION AND ENHANCEMENT PLAN LINK 5 Sl. No. Village/Town Description of Religious Properties Percentage Affected Structure Area 1 Kanakari ST. Thomas Church 0 2 Kanakari Roadside shrine 1.000 3 Kanakari Bala Subramaniam Temple 0 4 Kuravilangad Church land 0 5 Kuravilangad Temple land 0 6 Kuravilangad Kalikavu Devi Temple 0 7 Monipally Prayer Hall 0.167 8 Monipally Roadside shrine 0 9 Koothattukulam Shrine of St. John Syrian Church 0 10 Koothattukulam Shrine of St. John Syrian Church 0 11 Palakuzha Yacoba Church 0 12 Palakuzha Church 0.950 13 Palakuzha Roadside Christian Shrine 0 The team found out three distinct cases for KSTP II impact mitigation. These are Design changes made to save cultural properties Accordingly most of the cultural properties have been saved. Relocation necessary In few cases some land acquisition will also be necessary. Hundai The team could find that many shrines marked earlier by surveyors are not actually shrines they are all money collecting boxes of the shrines kept on roadsides. In Kerala, the removal and relocation of these sites will be relatively easier still need consultation with the affected groups. Environmental Enhancement and landscaping. At least in many cases cultural property enhancement measures are necessary. Wilbur Smith Associates Pvt. Ltd. A.170 Kerala State Transport Project Public Works Department