INTEGRTED FOREST ECOSYSTEM MANAGEMENT PROJECT General Procurement Thresholds and Methods of Procurement: The following methods of procurement shall be used for procurement under the project. It has been agreed that if a invitation for a bid is comprised of several packages, lots or slices, and invited in the same invitation for bid, then the aggregate value of the whole package determines the applicable threshold amount for procurement and also for the review by the Bank. The national competitive bidding (NCB) conditions will be part of the Financing Agreement. Expenditur Contract Procurement Bank Prior Review e Category Value Method (USD) >= 5, 000 ICB All ICB contracts 000 < 5, NCB NA Civil Works 000,000 <50 000 Shopping NA NA DC >= 5, 000 000 >= 1, 000 ICB All ICB contracts 000 <1, 000 NCB NA Goods 000 <100 000 Shopping NA NA DC >= 1, 500 000 NA QCBS, QBS, FBS, All contracts >= USD Consultant LCS and CQS* 500,000 for firms; all Services NA SSS contracts >= USD NA IC 200,000 for individuals; Notes: ICB – International Competitive Bidding All TORs NCB – National Competitive Bidding DC – Direct Contracting QCBS – Quality and Cost Based Selection QBS – Quality Based Selection FBS – Fixed Budget Selection LCS – Least Cost Selection *CQS – Selection Based on Consultants’ Qualification below $300,000 depending on the nature of assignment SSS – Single (or Sole) Source Selection IC – Individual Consultant selection procedure NA – Not Applicable July 9, 2010 Summary of the Procurement Packages planned during the first 18 months after project effectiveness 1. PROCUREMENT PLAN (July 2015) Date WB of Proc. Revie Item Contra Contract Description Metho w № ct d (Prior/ Signin Post) g GOODS Component 1. Forest Sector Institutional Reform No goods Component 2. Strategic Investments and Piloting of Sustainable Management Approaches NCB/S 1 Financing the implementation of INRMPs Prior/Post H Investments like afforestation of short NCB/S 2 rotation tree species, natural Prior/Post H regeneration through thinning etc. Component 3. Information and Monitoring and Evaluation National Forest Inventory (NFI) and the 9/1/20 3 Management Forest Inventory (MFI) ICB Prior 16 (Non-consulting services) 6/1/20 4 Office equipment for FMIS NCB Prior 17 Component 4. Project Management, Monitoring and Evaluation 3/1/20 5 Computers for PCU SH Prior 16 3/1/20 6 Furniture for PCU SH Post 16 3/1/20 7 Car for PCU SH Post 16 3/1/20 8 Accounting software for PCU SH Post 16 CONSULTANCY LARGE Date WB Select of Revie Item . Contra Contract Description w № Metho ct (Prior/ d Signin Post) g July 9, 2010 Component 1. Forest Sector Institutional Reform Support of introduction of new principles 9/1/20 1 QCBS Prior of planning, budgeting and monitoring /a 16 Component 2. Strategic Investments and Piloting of Sustainable Management Approaches Preparation of the Integrated Natural 9/1/20 2 QCBS Prior Resource Management Plans (INRMPs) 16 Component 3. Information and Monitoring and Evaluation The Forest Management Information 1/1/20 3 QCBS Prior System (FMIS) 17 Component 4. Project Management, Monitoring and Evaluation 9/1/20 4 Project Audit LCS Prior 16 July 9, 2010 PROCUREMENT Kyrgyz Republic : Integrated Forest Ecosystem Management PLAN General Information Country: Kyrgyz Republic 2018-04-04 Bank’s Approval Date of the Original Procurement Plan: 2022-06-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151102 GPN Date: 2020-09-11 Project Name: Integrated Forest Ecosystem Management Loan / Credit No: IDA / D0950, IDA / 57430 State Agency on Environment Protection and Forestry Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned IFEMP-INVEST-W-SH-10-201 Strategic Investments and Pi Request for Quota Single Stage - One E 2019-08-0 9 / Fencing in Aksu leskhoz 8 IDA / D0950 loting of Sustainable Manag Post Open - National 11,912.00 0.00 Canceled 2019-06-05 2019-07-05 tions nvelope 5 hectare ement Approaches IFEMP-INVEST-W-SH-1-2019 / Installation of fencing and s Strategic Investments and Pi oil preparation for planting fo Request for Quota Single Stage - One E 2019-11-2 IDA / D0950 loting of Sustainable Manag Post Open - National 27,696.00 27,058.67 Completed 2019-08-14 2019-08-30 2019-09-09 2019-09-18 rest crops, fast-growing plant tions nvelope 9 ement Approaches ations and orchards in Uch-K orgon LH for the current and next years. IFEMP-INVEST-W-SH-2-2019 / Installation of fencing and s Strategic Investments and Pi oil preparation for planting fo Request for Quota Single Stage - One E 2019-11-2 IDA / D0950 loting of Sustainable Manag Post Open - National 290,772.00 168,911.54 Completed 2019-08-14 2019-08-30 2019-09-09 2019-09-18 rest crops, fast-growing plant tions nvelope 9 ement Approaches ations and orchards in Naryn LH in the current and next ye ars. IFEMP-INVEST-W-SH -3-2019 / Installation of fencing and s Strategic Investments and Pi oil preparation for planting fo Request for Quota Single Stage - One E 2019-11-2 IDA / D0950 loting of Sustainable Manag Post Open - National 80,655.00 70,213.58 Completed 2019-08-14 2019-08-30 2019-09-09 2019-09-18 rest crops, fast-growing plant tions nvelope 9 ement Approaches ations and orchards in Batke n LH for the current and next years. IFEMP-INVEST-W-SH -4- 201 9 / Installation of fencing and Strategic Investments and Pi soil preparation for planting f Request for Quota Single Stage - One E 2019-11-2 IDA / D0950 loting of Sustainable Manag Post Open - National 109,980.00 82,803.43 Completed 2019-08-14 2019-08-30 2019-09-09 2019-09-18 orest crops, fast-growing pla tions nvelope 9 ement Approaches ntations and orchards in Tokt ogul LH for the current and n ext years. IFEMP-INVEST-W-SH-5-2019 / Installation of fencing and s Strategic Investments and Pi oil preparation for planting fo Request for Quota Single Stage - One E 2019-11-2 IDA / D0950 loting of Sustainable Manag Post Open - National 136,138.00 93,094.05 Completed 2019-08-14 2019-08-30 2019-09-09 2019-09-18 rest crops, fast-growing plant tions nvelope 9 ement Approaches ations and orchards in Talas LH for the current and next y ears. IFEMP-INVEST-W-SH -6-2019 / Installation of fencing and s Strategic Investments and Pi oil preparation for planting fo Request for Quota Single Stage - One E 2019-11-2 IDA / D0950 loting of Sustainable Manag Post Open - National 67,031.00 46,563.62 Completed 2019-08-14 2019-08-30 2019-09-09 2019-09-18 rest crops, fast-growing plant tions nvelope 9 ement Approaches ations and orchards in Aksy L H for the current and next ye ars. IFEMP-INVEST-W-SH -7-2019 / Installation of fencing and s Strategic Investments and Pi oil preparation for planting fo Request for Quota Single Stage - One E 2019-11-2 IDA / D0950 loting of Sustainable Manag Post Open - National 202,650.00 141,188.34 Completed 2019-08-14 2019-08-30 2019-09-09 2019-09-18 rest crops, fast-growing plant tions nvelope 9 ement Approaches ations and orchards in Kara-K uldzha LH for the current and next years. IFEMP-INVEST-W-SH -8-2019 / Installation of fencing and s Strategic Investments and Pi oil preparation for planting fo Request for Quota Single Stage - One E 2019-11-2 IDA / D0950 loting of Sustainable Manag Post Open - National 128,234.00 78,687.27 Completed 2019-08-14 2019-08-30 2019-09-09 2019-09-18 rest crops, fast-growing plant tions nvelope 9 ement Approaches ations and orchards in Toskol -Ata (Kochkor-Ata) LH for the current and next years. IFEMP-INVEST-W-SH-9-2019 / Installation of fencing and s Strategic Investments and Pi oil preparation for planting fo Request for Quota Single Stage - One E 2019-11-2 IDA / D0950 loting of Sustainable Manag Post Open - National 194,000.00 145,193.60 Completed 2019-08-14 2019-08-30 2019-09-09 2019-09-18 rest crops, fast-growing plant tions nvelope 9 ement Approaches ations and orchards in Karak ol (Aksuu) LH for the current and next years. IFEMP-INVEST-W-SH-11-201 9 / Installation of fencing and Strategic Investments and Pi soil preparation for planting f Request for Quota Single Stage - One E 2019-11-2 IDA / D0950 loting of Sustainable Manag Post Open - National 113,259.00 80,647.33 Completed 2019-08-14 2019-08-30 2019-09-09 2019-09-18 orest crops, fast-growing pla tions nvelope 9 ement Approaches ntations and orchards in At-B ashy LH for the current and n ext years. IFEMP-INVEST-W-SH-12-201 9 / Installation of fencing and Strategic Investments and Pi soil preparation for planting f Request for Quota Single Stage - One E 2019-11-2 IDA / D0950 loting of Sustainable Manag Post Open - National 64,191.00 47,463.04 Completed 2019-08-14 2019-08-30 2019-09-09 2019-09-18 orest crops, fast-growing pla tions nvelope 9 ement Approaches ntations and orchards in Chui LH for the current and next y ears. IFEMP-INVEST-W-SH-13-201 9 / Installation of fencing and Strategic Investments and Pi soil preparation for planting f Request for Quota Single Stage - One E 2019-11-2 IDA / D0950 loting of Sustainable Manag Post Open - National 72,780.00 37,256.77 Completed 2019-08-14 2019-08-30 2019-09-09 2019-09-18 orest crops, fast-growing pla tions nvelope 9 ement Approaches ntations and orchards in Frun ze LH for the current and nex t years. IFEMP-INVEST-W-SH-1/1-201 9 / Installation of fencing and Strategic Investments and Pi soil preparation for planting f 2020-01-3 IDA / D0950 loting of Sustainable Manag Post Direct Selection Direct 27,696.00 36,983.00 Completed 2019-10-30 2019-10-31 2019-10-31 2019-11-01 2019-11-01 2019-11-04 orest crops, fast - growing pl 0 ement Approaches antations and orchards in Uc h-Korgon LH for the courrent and next years Page 1 IFEMP-INVEST-W-SH-12/1-20 19 / Installation of fencing an Strategic Investments and Pi d soil preparation for plantin 2020-01-3 IDA / D0950 loting of Sustainable Manag Post Direct Selection Direct 64,191.00 53,197.61 Completed 2019-10-30 2019-10-31 2019-10-31 2019-11-01 2019-11-01 2019-11-04 g forest crops, fast -growing 0 ement Approaches plantations and orchards in C hui LH for the courrent and n ext years IFEMP-INVEST-W-SH-5/1 -20 19 / Installation of fencing an Strategic Investments and Pi d soil preparation for plantin 2020-01-3 IDA / D0950 loting of Sustainable Manag Post Direct Selection Direct 136,138.00 110,482.26 Completed 2019-10-30 2019-11-01 2019-10-31 2019-11-01 2019-11-01 2019-11-04 g forest crops, fast-growing p 0 ement Approaches lantations and orchards in Ta las LH for the courent and ne xt years IFEMP/INVEST/W/NCB-1-202 0 / Installation of fences and Strategic Investments and Pi Single Stage - One E 2020-07-1 soil preparation for planting f IDA / D0950 loting of Sustainable Manag Post Request for Bids Open - National 290,714.00 246,772.90 Signed 2020-02-17 2020-02-21 2020-02-19 2020-02-20 2020-03-11 2020-03-13 2020-03-20 2020-04-30 2020-04-20 2020-06-05 nvelope 9 orest crops in Chui, Toktogul, ement Approaches Uch-Korgon, Batken, Karakol, Naryn, At-Bashy leskhozes IFEMP/INVEST/W/NCB-4-202 0 / Construction of 10 green Strategic Investments and Pi houses and 2 concrete pits in Single Stage - One E 2021-03-3 IDA / 57430 loting of Sustainable Manag Post Request for Bids Open - National 479,145.00 289,218.32 Completed 2020-06-12 2020-06-17 2020-06-17 2020-06-19 2020-07-08 2020-07-10 2020-07-22 2020-07-10 2020-08-21 2020-09-25 pilot leskhozes (Karakol, At-B nvelope 1 ement Approaches ashy, Naryn, Chuy, Talas, To ktogul,Aksy, Toskool-Ata,Uch -Korgon,Kara-Kuldzha) IFEMP/INVEST/W/NCB-2-202 0 / Construction of 21 cordon Strategic Investments and Pi Single Stage - One E 1,028,634.5 2021-06-3 -houses of the northern pilot IDA / 57430 loting of Sustainable Manag Post Request for Bids Open - National 1,272,770.00 Signed 2020-06-12 2020-06-17 2020-06-17 2020-06-19 2020-07-08 2020-07-10 2020-07-22 2020-07-17 2020-08-21 2020-09-02 nvelope 6 0 leskhozes (Talas, Karakol, N ement Approaches aryn, At-Bashy, Ton, Chui, Fr unze) IFEMP/INVEST/W/NCB-3-202 0 / Construction of 21 cordon Strategic Investments and Pi Single Stage - One E 2021-06-3 - houses of the southern pilot IDA / 57430 loting of Sustainable Manag Post Request for Bids Open - National 1,023,280.00 881,799.16 Signed 2020-06-12 2020-06-17 2020-06-17 2020-06-19 2020-07-08 2020-07-10 2020-07-22 2020-08-06 2020-08-21 2020-09-18 nvelope 0 leskhozes (Toktogul,Uch Korg ement Approaches on, Batken, Aksy, Kara-Kuldz ha, Toskool-Ata) IFEMP/INVEST/W/NCB-7-202 Strategic Investments and Pi 0 / Construction of 4 bridges i Single Stage - One E 2021-06-2 IDA / 57430 loting of Sustainable Manag Post Request for Bids Open - National 198,866.00 156,900.67 Completed 2020-06-23 2020-07-14 2020-07-08 2020-07-15 2020-07-29 2020-08-05 2020-08-10 2020-08-24 2020-08-28 2020-09-07 n pilot leskhozes ( Karakol 1, nvelope 8 ement Approaches Toskool Ata 1, Toktogul 1, Ba tken 1) IFEMP/INVEST/W/NCB-8-202 Strategic Investments and Pi 0 / Construction of irrigation f Single Stage - One E 2021-06-2 IDA / 57430 loting of Sustainable Manag Post Request for Bids Open - National 556,957.00 330,368.99 Signed 2020-06-23 2020-08-26 2020-07-08 2020-08-28 2020-07-29 2020-09-18 2020-08-10 2020-11-02 2020-08-28 2020-12-10 acilities in pilot leskhozes (Ka nvelope 8 ement Approaches rakol, Frunze, Uch-Korgon, K ara-Kulzha, Toktogul) IFEMP/INVEST/W/NCB-9-202 Strategic Investments and Pi 0 / Construction of power line Single Stage - One E 2021-06-2 IDA / 57430 loting of Sustainable Manag Post Request for Bids Open - National 194,893.00 164,614.28 Signed 2020-06-23 2020-08-20 2020-07-08 2020-08-21 2020-07-29 2020-09-11 2020-08-11 2020-09-25 2020-08-28 2020-10-28 s and installation of TS in pilo nvelope 8 ement Approaches t leskhozes (Karakol, Kara-Ku lzha) IFEMP/INVEST/W/NCB-5-202 Strategic Investments and Pi Single Stage - One E 2021-06-2 0 / Сonstruction of irrigation IDA / 57430 loting of Sustainable Manag Post Request for Bids Open - National 359,488.00 0.00 Canceled 2020-06-23 2020-08-06 2020-07-08 2020-08-06 2020-07-29 2020-08-10 2020-08-28 nvelope 8 canals from trays in pilot lesh ement Approaches ozes (Chui, Ton) IFEMP/INVEST/W/NCB-5/202 Strategic Investments and Pi Single Stage - One E 2021-07-0 0 / Сonstruction of irrigation IDA / 57430 loting of Sustainable Manag Post Request for Bids Open - National 420,671.00 334,399.12 Completed 2020-09-09 2020-09-22 2020-09-11 2020-09-23 2020-10-02 2020-10-14 2020-10-16 2020-10-26 2020-11-02 2020-12-01 nvelope 2 canals from trays in pilot lesh ement Approaches ozes (Chui, Ton) IFEMP/INVEST/W/NCB-6-202 Strategic Investments and Pi 0 / Drilling and rehabilitation Single Stage - One E 2021-06-2 IDA / 57430 loting of Sustainable Manag Post Request for Bids Open - National 297,199.00 262,393.99 Signed 2020-06-23 2021-03-02 2020-06-29 2021-03-02 2020-07-08 2021-03-23 2020-07-29 2021-04-14 2020-08-28 2021-05-17 of 6 wells in pilot leskhozes ( nvelope 8 ement Approaches Karakol 2, Balykchi 4) IDA/IFEMP/W/NCB/2021/3 / O Strategic Investments and Pi Single Stage - One E 2022-05-3 verhaul of "Dugoba" tuoristic IDA / 57430 loting of Sustainable Manag Post Request for Bids Open - National 467,282.00 404,412.77 Completed 2021-03-26 2021-03-31 2021-03-30 2021-04-02 2021-04-20 2021-04-23 2021-04-30 2021-04-29 2021-05-31 2021-05-21 nvelope 0 house ement Approaches IFEMP/INVEST/W/NCB-7/1-20 21 / R/c cattle run bridge con Strategic Investments and Pi Single Stage - One E 2022-01-0 struction through the Kara-K IDA / 57430 loting of Sustainable Manag Post Request for Bids Open - National 39,646.00 40,047.35 Completed 2021-03-26 2021-03-31 2021-03-30 2021-04-08 2021-04-20 2021-04-23 2021-04-30 2021-04-28 2021-05-31 2021-05-28 nvelope 1 ol River on the territory of Ko ement Approaches chkor-Ata LH (Toskool-Ata) IDA/IFEMP/LSGB/W/NCB/202 Strategic Investments and Pi Single Stage - One E 2022-01-3 1/5 / Consrtuction of pipeline IDA / D0950 loting of Sustainable Manag Post Request for Bids Open - National 123,954.00 117,972.75 Completed 2021-03-29 2021-03-31 2021-04-02 2021-04-02 2021-04-23 2021-04-23 2021-04-30 2021-04-28 2021-05-31 2021-05-17 nvelope 1 and storage tanks in Dostuk ement Approaches LSGB IDA/IFEMP/W/NCB/2021/4 / O verhaul of the administrative Strategic Investments and Pi Single Stage - One E 2022-05-3 building of Toktogul LH and c IDA / 57430 loting of Sustainable Manag Post Request for Bids Open - National 89,695.00 78,153.14 Signed 2021-03-26 2021-03-31 2021-03-30 2021-04-02 2021-04-20 2021-04-23 2021-04-30 2021-04-28 2021-05-31 2021-05-28 nvelope 0 onstruction of a canopy box f ement Approaches or equipment in Kara-Kuldzh a LH IDA/IFEMP/W/NCB/2021/2 / C Strategic Investments and Pi Single Stage - One E 2022-05-3 onstruction of administrative IDA / 57430 loting of Sustainable Manag Post Request for Bids Open - National 251,600.00 198,424.12 Signed 2021-03-26 2021-03-31 2021-03-30 2021-04-02 2021-04-20 2021-04-23 2021-04-30 2021-04-28 2021-05-31 2021-05-28 nvelope 0 building of Chuy leskhoze ement Approaches IDA/IFEMP/W/NCB/2021/1 / C Strategic Investments and Pi Single Stage - One E 2022-02-2 onstruction of refrigerating c IDA / 57430 loting of Sustainable Manag Post Request for Bids Open - National 964,336.00 939,074.07 Signed 2021-03-05 2021-03-31 2021-03-12 2021-04-02 2021-04-02 2021-04-23 2021-04-12 2021-04-28 2021-04-27 2021-05-28 nvelope 8 hambers and processing sho ement Approaches ps GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KG-IFEMP-SH-COMPS-005-20 18 / Procurement of Compute rs and office equipment as a Forest Sector Institutional Re Request for Quota Single Stage - One E IDA / D0950 Post Limited 22,000.00 20,997.94 Completed 2018-03-19 2018-04-30 2018-05-08 2018-05-30 2018-05-28 support of Joint Forest Manag form tions nvelope ement Council (JFMC) and Co nsultative and Coordination Council (CCC) Page 2 KG-IFEMP-SH-FURNITURE-00 3-2018 / Office furniture as a Forest Sector Institutional Re Request for Quota Single Stage - One E support of Joint Forest Manag IDA / D0950 Post Limited 4,000.00 0.00 Canceled 2018-03-19 2018-04-23 2018-05-23 form tions nvelope ement Council (JFMC) and Co nsultative Coordination Coun cil (CCC) IFMP-SH-PRINT-004-2018 / In Forest Sector Institutional Re Request for Quota Single Stage - One E IDA / D0950 Post Open - National 8,500.00 2,804.09 Completed 2018-08-03 2018-09-12 2018-08-28 2018-10-08 2018-09-24 formation Board in pilot leskh form tions nvelope ozes IFMP-SH-FURNITURE-005/1-2 Forest Sector Institutional Re Request for Quota Single Stage - One E 018 / Support CCC and JFMC IDA / D0950 Post Open - National 10,080.00 4,024.56 Completed 2018-08-08 2018-08-28 2018-08-28 2018-09-28 2018-09-24 form tions nvelope (office furniture) IFMP-SH-PRINT-005-2018 / In Forest Sector Institutional Re Request for Quota Single Stage - One E IDA / D0950 Post Open - National 5,000.00 3,708.51 Completed 2018-08-17 2018-09-21 2018-09-10 2018-10-21 2018-10-31 formation poster in pilot lesk form tions nvelope hozes IFEMP-SH-COMPS-001-2017 / Project Management, Monito Request for Quota Single Stage - One E IDA / D0950 Post Limited 7,200.00 8,071.60 Completed 2017-06-05 2017-06-15 2017-07-02 2017-07-06 2017-07-27 2017-11-30 Computers for PCU ring and Evaluation tions nvelope IFEMP-SH-VEHICLE-004-2017 Project Management, Monito Request for Quota Single Stage - One E IDA / D0950 Post Limited 80,000.00 80,790.33 Completed 2017-06-26 2017-06-30 2017-07-31 2017-08-07 2017-08-30 2017-08-28 / Car for PCU ring and Evaluation tions nvelope KG-IFEMP-SH-MNE-005-2018 / Server for the development Project Management, Monito Request for Quota Single Stage - One E IDA / D0950 Post Open - National 2,000.00 3,684.59 Completed 2018-09-24 2018-10-18 2018-09-10 2018-11-18 2018-10-25 of IFEMP database for MnE a ring and Evaluation tions nvelope nd office equipment KG-IFEMP- SH-COMPS -007- Project Management, Monito Request for Quota Single Stage - One E IDA / D0950 Post Open - National 10,000.00 5,317.87 Completed 2018-11-23 2018-11-30 2018-12-17 2019-01-11 2019-02-07 2018-12-31 2018 / Computers for PIU ring and Evaluation tions nvelope IFEMP-INVEST-G-SH-5-2019 / Strategic Investments and Pi Request for Quota Single Stage - One E Purchase of motor cultivato r IDA / 57430 loting of Sustainable Manag Post Open - National 18,859.00 33,012.91 Completed 2019-06-05 2019-07-08 2019-07-05 2019-08-29 2019-08-05 2019-10-08 tions nvelope with a plow and tree shovels ement Approaches IFEMP-INVEST-G-NCB-2-2019 Strategic Investments and Pi Single Stage - One E / Purchase of a car with fie-fi IDA / 57430 loting of Sustainable Manag Post Request for Bids Open - National 471,486.00 389,071.31 Completed 2019-06-13 2019-06-28 2019-06-18 2019-07-08 2019-06-27 2019-07-24 2019-07-03 2019-08-01 2019-08-05 2019-09-11 2019-10-07 2019-11-05 nvelope ghting equipment (MLPK) for ement Approaches pilot leskozes IFEMP-INVEST-G-NCB-3-2019 Strategic Investments and Pi Single Stage - One E / Purchase of wheeled tractor IDA / 57430 loting of Sustainable Manag Post Request for Bids Open - National 537,003.00 523,344.13 Completed 2019-06-11 2019-06-28 2019-06-11 2019-07-08 2019-06-27 2019-07-24 2019-07-03 2019-08-01 2019-08-01 2019-09-11 2019-10-07 2019-11-05 nvelope s with mounted equipment ement Approaches IFEMP-INVEST-G-NCB-4-2019 Strategic Investments and Pi Single Stage - One E / Purchase of wheeled mini tr IDA / 57430 loting of Sustainable Manag Post Request for Bids Open - National 124,348.00 87,142.83 Completed 2019-06-13 2019-07-05 2019-06-18 2019-07-08 2019-06-27 2019-07-24 2019-07-03 2019-08-01 2019-08-01 2019-09-11 2019-10-07 2019-11-05 nvelope actors with mounted equipm ement Approaches ent IFEMP-SH-PRINT-010-2019 / Forest Sector Institutional Re Request for Quota Single Stage - One E Development and replication IDA / D0950 Post Open - National 1,500.00 616.63 Completed 2019-09-06 2019-08-30 2019-09-13 2019-09-18 2019-09-27 2019-10-01 form tions nvelope of booklets on municipal fore sts IFEMP-INVEST-G-SH-6-2019 / Strategic Investments and Pi Request for Quota Single Stage - One E Purchase of materials for fen IDA / D0950 loting of Sustainable Manag Post Open - National 21,540.00 0.00 Canceled 2019-06-05 2019-07-08 2019-08-07 tions nvelope cing of 4 km in Naryn leskhoz ement Approaches KG-IFEMP-SH-02-2020 / Com Project Management, Monito Request for Quota Single Stage - One E IDA / D0950 Post Open - National 4,091.00 2,989.97 Completed 2020-02-07 2020-02-06 2020-02-28 2020-03-11 2020-03-29 2020-05-21 puter equipment for PIU ring and Evaluation tions nvelope IFEMP-SH-03-2020 / Develop Forest Sector Institutional Re Request for Quota Single Stage - One E ment and replication of bookl IDA / D0950 Post Open - National 1,000.00 0.00 Canceled 2020-03-06 2020-02-06 2020-04-01 2020-04-24 form tions nvelope ets and barcodes of PIU IFEMP-/INVEST/G/SH-1-2020 Strategic Investments and Pi Request for Quota Single Stage - One E / Beekeeping equipment for IDA / D0950 loting of Sustainable Manag Post Open - National 40,383.00 35,084.76 Completed 2020-03-04 2020-02-20 2020-04-06 2020-03-16 2020-05-06 2020-06-04 tions nvelope At-Bashi leskhozes ement Approaches IFEMP/INVEST/G/NCB-1-2020 Strategic Investments and Pi Single Stage - One E / Beekeeping equipment for IDA / D0950 loting of Sustainable Manag Post Request for Bids Open - National 141,345.00 96,904.37 Completed 2020-02-19 2020-02-21 2020-03-04 2020-02-21 2020-03-25 2020-03-13 2020-03-31 2020-04-20 2020-04-29 2020-05-21 2020-05-29 2020-07-10 nvelope Kara-Kuldzhinsky leskhoz ement Approaches IFEMP-/INVEST/G/SH-2-2020 Strategic Investments and Pi Request for Quota Single Stage - One E / Purchase of planting materi IDA / D0950 loting of Sustainable Manag Post Open - National 26,140.00 7,746.63 Completed 2020-02-21 2020-02-21 2020-03-16 2020-03-16 2020-04-15 2020-03-24 tions nvelope als for Chuy leskhoz ement Approaches IFEMP-/INVEST/G/SH-3-2020 Strategic Investments and Pi Request for Quota Single Stage - One E / Purchase of planting materi IDA / D0950 loting of Sustainable Manag Post Open - National 45,810.00 21,945.12 Completed 2020-02-21 2020-02-21 2020-03-16 2020-03-16 2020-04-15 2021-03-16 tions nvelope als for Ton leskhoz ement Approaches IFEMP-/INVEST/G/SH-4-2020 Strategic Investments and Pi Request for Quota Single Stage - One E / Purchase of planting materi IDA / D0950 loting of Sustainable Manag Post Open - National 6,650.00 1,912.52 Completed 2020-02-21 2020-02-21 2020-03-16 2020-03-16 2020-04-15 2020-03-25 tions nvelope als for Karakol leskhoz ement Approaches IFEMP-/INVEST/G/SH-5-2020 Strategic Investments and Pi Request for Quota Single Stage - One E / Purchase of planting materi IDA / D0950 loting of Sustainable Manag Post Open - National 30,410.00 19,421.43 Completed 2020-02-21 2020-02-21 2020-03-16 2020-03-16 2020-04-15 2021-11-26 tions nvelope als for Naryn leskhoz ement Approaches IFEMP-/INVEST/G/SH-6-2020 Strategic Investments and Pi Request for Quota Single Stage - One E / Purchase of planting materi IDA / D0950 loting of Sustainable Manag Post Open - National 7,730.00 4,937.65 Completed 2020-02-21 2020-02-21 2020-03-16 2020-03-16 2020-04-15 2021-04-26 tions nvelope als for At-Bashi leskhoz ement Approaches IFEMP-/INVEST/G/SH-7-2020 Strategic Investments and Pi Request for Quota Single Stage - One E Under Imple / Purchase of planting materi IDA / D0950 loting of Sustainable Manag Post Open - National 34,210.00 10,565.21 2020-02-21 2020-02-21 2020-03-16 2020-03-27 2020-04-15 2020-11-23 tions nvelope mentation als for Toktogul leskhoz ement Approaches IFEMP/INVEST/LSGB/G/NCB/- Strategic Investments and Pi Single Stage - One E 1-2020 / Special technique fo IDA / D0950 loting of Sustainable Manag Post Request for Bids Open - National 226,274.00 188,632.49 Completed 2020-05-01 2020-05-12 2020-05-08 2020-05-15 2020-05-29 2020-06-05 2020-06-05 2020-06-26 2020-07-01 2020-07-24 2020-09-01 2020-09-14 nvelope r 6 LSGB ement Approaches IFEMP-COVID-SH-1-2020 / Pu Strategic Investments and Pi Request for Quota Single Stage - One E Under Imple rchase of calcium hypochlorit IDA / 57430 loting of Sustainable Manag Post Open - National 15,000.00 13,158.04 2020-04-27 2020-04-30 2020-05-08 2020-05-18 2020-05-22 2020-05-18 tions nvelope mentation e (chlorine) ement Approaches IFEMP-COVID-SH-2-2020 / Pu Strategic Investments and Pi Request for Quota Single Stage - One E rchase of individual protectiv IDA / 57430 loting of Sustainable Manag Post Open - National 85,000.00 66,869.52 Completed 2020-05-06 2020-05-15 2020-05-27 2020-05-26 2020-06-27 2020-07-17 tions nvelope e means ement Approaches IFEMP/INVEST/M/G/SH/-1-202 Strategic Investments and Pi Request for Quota Single Stage - One E 0 / Purchase of planting mate IDA / D0950 loting of Sustainable Manag Post Open - National 55,384.00 0.00 Canceled 2020-03-27 2020-04-21 2020-05-11 tions nvelope rials for Cholpon Ata Ail Aima ement Approaches k Page 3 IFEMP/INVEST/M/G/SH/-2-202 Strategic Investments and Pi Request for Quota Single Stage - One E 0 / Purchase of planting mate IDA / D0950 loting of Sustainable Manag Post Open - National 12,637.00 0.00 Canceled 2020-03-27 2020-04-21 2020-05-11 tions nvelope rials for Bel Aldy Ail Aimak ement Approaches IFEMP-/INVEST/G/SH-8-2020 Strategic Investments and Pi Request for Quota Single Stage - One E / Materials and equipment for IDA / 57430 loting of Sustainable Manag Post Open - National 29,200.00 26,462.72 Completed 2020-08-07 2020-08-14 2020-09-01 2020-09-04 2020-10-01 2020-10-09 tions nvelope drip irrigation system of Kara ement Approaches kol leskhoz IFEMP-/INVEST/G/SH-9-2020 Strategic Investments and Pi / Materials and equipment for Request for Quota Single Stage - One E IDA / 57430 loting of Sustainable Manag Post Open - National 96,600.00 80,652.76 Completed 2020-08-07 2020-08-14 2020-09-01 2020-09-04 2020-10-01 2020-09-22 drip irrigation system of Kara tions nvelope ement Approaches - Kuldzha leskhoz IFEMP-/INVEST/G/SH-10-202 Strategic Investments and Pi Request for Quota Single Stage - One E 0 / Materials and equipment f IDA / 57430 loting of Sustainable Manag Post Open - National 12,250.00 11,105.48 Completed 2020-08-07 2020-08-14 2020-09-01 2020-09-04 2020-10-01 2020-10-19 tions nvelope or drip irrigation system of A ement Approaches ksy leskhoz IFEMP/INVEST/LSGB/G/SH-1- Strategic Investments and Pi 2020 / Purchase of materials Request for Quota Single Stage - One E IDA / D0950 loting of Sustainable Manag Post Open - National 56,920.00 45,891.13 Completed 2020-08-14 2020-08-21 2020-09-10 2020-09-09 2020-10-05 2020-11-12 for fencing plots of forest and tions nvelope ement Approaches fruit plantations for Cholpon Ata Aiyl Aymak IFEMP/INVEST/LSGB/G/SH-2- Strategic Investments and Pi 2020 / Purchase of materials Request for Quota Single Stage - One E IDA / D0950 loting of Sustainable Manag Post Open - National 27,240.00 23,898.84 Completed 2020-08-14 2020-08-21 2020-09-11 2020-09-09 2020-10-05 2020-11-17 for fencing plots of forest and tions nvelope ement Approaches fruit plantations for Zhany Zh ol Aiyl Aymak IFEMP/INVEST/LSGB/G/SH-3- Strategic Investments and Pi 2020 / Purchase of materials Request for Quota Single Stage - One E IDA / D0950 loting of Sustainable Manag Post Open - National 28,870.00 26,557.67 Completed 2020-08-14 2020-08-21 2020-09-11 2020-09-09 2020-10-05 2020-12-04 for fencing plots of forest and tions nvelope ement Approaches fruit plantations for Onbir Zh ylga Aiyl Aymak IFEMP/INVEST/LSGB/G/SH-4- Strategic Investments and Pi 2020 / Purchase of materials Request for Quota Single Stage - One E IDA / D0950 loting of Sustainable Manag Post Open - National 36,142.00 25,729.36 Completed 2020-08-14 2020-08-21 2020-09-11 2020-09-07 2020-10-05 2020-10-14 for fencing plots of forest and tions nvelope ement Approaches fruit plantations for Bel Aldy Aiyl Aymak IFEMP/INVEST/LSGB/G/SH-5- Strategic Investments and Pi 2020 / Purchase of materials Request for Quota Single Stage - One E IDA / D0950 loting of Sustainable Manag Post Open - National 41,247.00 31,688.34 Completed 2020-08-14 2020-08-21 2020-09-11 2020-09-09 2020-10-05 2020-11-17 for fencing plots for forest an tions nvelope ement Approaches d fruit plantations for Nichke Sai Aiyl Aymak IFEMP/INVEST/LSGB/G/SH-6- Strategic Investments and Pi 2020 / Purchase of materials Request for Quota Single Stage - One E IDA / D0950 loting of Sustainable Manag Post Open - National 37,705.00 29,518.64 Completed 2020-08-14 2020-08-21 2020-09-11 2020-09-09 2020-10-05 2021-02-22 for fencing plots for forest an tions nvelope ement Approaches d fruit plantations for Dostuk Aiyl Aymak IFEMP/INVEST/LSGB/G/SH-7- Strategic Investments and Pi 2020 / Purchase of materials Request for Quota Single Stage - One E IDA / D0950 loting of Sustainable Manag Post Open - National 86,468.00 64,203.82 Completed 2020-08-14 2020-08-21 2020-09-11 2020-09-09 2020-10-05 2020-09-29 and equipment for drip irriga tions nvelope ement Approaches tion system for Zhany - Zhol ayil aimak IFEMP/INVEST/LSGB/G/SH-9- Strategic Investments and Pi 2020 / Purchase of materials Request for Quota Single Stage - One E IDA / D0950 loting of Sustainable Manag Post Open - National 47,930.00 38,263.85 Completed 2020-08-14 2020-08-21 2020-09-11 2020-09-09 2020-10-05 2020-11-12 and equipment for a drip irrig tions nvelope ement Approaches ation system for Cholpon-Ata aiyl aimak IFEMP/INVEST/LSGB/G/SH-10 Strategic Investments and Pi -2020 / Purchase of materials Request for Quota Single Stage - One E IDA / D0950 loting of Sustainable Manag Post Open - National 52,954.00 42,411.86 Completed 2020-08-14 2020-08-21 2020-09-11 2020-09-09 2020-10-05 2020-09-29 and equipment for drip irriga tions nvelope ement Approaches tion system for Nichke - Sai a iyl aimak IFEMP/INVEST/LSGB/G/SH-8- Strategic Investments and Pi 2020 / Purchase of materials Request for Quota Single Stage - One E IDA / D0950 loting of Sustainable Manag Post Open - National 68,958.00 52,133.85 Completed 2020-08-14 2020-08-28 2020-09-11 2020-09-21 2020-10-05 2020-11-12 and equipment for drip irriga tions nvelope ement Approaches tion system for Onbir - Zhilga ayil aimak IFEMP/INVEST/LSGB/G/SH-11 Strategic Investments and Pi -2020 / Purchase of materials Request for Quota Single Stage - One E IDA / D0950 loting of Sustainable Manag Post Open - National 79,258.00 51,417.57 Completed 2020-09-04 2020-09-09 2020-09-18 2020-10-01 2020-10-08 2020-11-12 and equipment for a drip irrig tions nvelope ement Approaches ation system for Bel-Aldy aiyl aimak IFEMP/INVEST/LSGB/G/SH-1/ 1/2021 / Purchase of material Strategic Investments and Pi Request for Quota Single Stage - One E s for fencing plots for forest a IDA / D0950 loting of Sustainable Manag Post Open - National 1,720.00 1,607.98 Completed 2021-01-13 2021-01-22 2021-01-26 2021-03-12 2021-02-15 2021-03-19 tions nvelope nd fruit plantations for Cholp ement Approaches on Ata Aiyl Aymak (Imerilish Plot) IFEMP/INVEST/LSGB/G/SH-5/ 2/2021 / Purchase of material Strategic Investments and Pi Request for Quota Single Stage - One E s for fencing plots for forest a IDA / D0950 loting of Sustainable Manag Post Open - National 4,700.00 4,465.98 Completed 2021-01-13 2021-01-21 2021-01-26 2021-03-12 2021-02-15 2021-03-19 tions nvelope nd fruit plantations for Nichk ement Approaches e Sai Aiyl Aymak (Chylpakai plot) IFEMP/INVEST/LSGB/G/SH/-1- Strategic Investments and Pi Request for Quota Single Stage - One E 2021 / Purchase of planting IDA / D0950 loting of Sustainable Manag Post Open - National 32,807.00 19,214.61 Completed 2021-02-19 2021-02-15 2021-03-05 2021-03-09 2021-03-22 2021-11-26 tions nvelope materials for Cholpon Ata Ail ement Approaches Aimak IFEMP/INVEST/LSGB/G/SH/-2- Strategic Investments and Pi Request for Quota Single Stage - One E 2021 / Purchase of planting IDA / D0950 loting of Sustainable Manag Post Open - National 64,748.00 36,229.27 Completed 2021-02-19 2021-02-15 2021-03-05 2021-03-09 2021-03-22 2021-03-19 tions nvelope materials for Bel Aldy Ail Aim ement Approaches ak IFEMP/INVEST/LSGB/G/SH/-3- Strategic Investments and Pi Request for Quota Single Stage - One E 2021 / Purchase of planting IDA / D0950 loting of Sustainable Manag Post Open - National 14,150.00 5,005.47 Completed 2021-02-19 2021-02-15 2021-03-05 2021-03-09 2021-03-22 2021-03-30 tions nvelope materials for Zhany Zhol Ail ement Approaches Aimak IFEMP/INVEST/LSGB/G/SH/-5- Strategic Investments and Pi Request for Quota Single Stage - One E 2021 / Purchase of planting IDA / D0950 loting of Sustainable Manag Post Open - National 37,875.00 37,594.10 Signed 2021-02-19 2021-02-15 2021-03-05 2021-03-09 2021-03-22 tions nvelope materials for Dostuk Ail Aima ement Approaches k IFEMP/INVEST/LSGB/G/SH/-6- Strategic Investments and Pi Request for Quota Single Stage - One E 2021 / Purchase of planting IDA / D0950 loting of Sustainable Manag Post Open - National 34,016.00 18,873.41 Completed 2021-02-19 2021-02-15 2021-03-05 2021-03-09 2021-03-22 2021-03-19 tions nvelope materials for Nichke Sai Ail Ai ement Approaches mak IFEMP/INVEST/LSGB/G/SH/-4- Strategic Investments and Pi Request for Quota Single Stage - One E 2021 / Purchase of planting IDA / D0950 loting of Sustainable Manag Post Open - National 50,475.00 21,337.51 Signed 2021-02-19 2021-02-15 2021-03-05 2021-03-09 2021-03-22 tions nvelope materials for Onbir Zhylga Ail ement Approaches Aimak IDA/IFEMP/G/SH/COVID/5/20 Strategic Investments and Pi 21 / Purchase of planting mat Request for Quota Single Stage - One E IDA / 57430 loting of Sustainable Manag Post Open - National 18,840.00 0.00 Canceled 2021-02-20 2021-03-02 2021-03-12 2021-03-29 erial for vulnerable layers in tions nvelope ement Approaches pilot zone of Chui leskhoz Page 4 IDA/IFEMP/G/SH/COVID/6/20 Strategic Investments and Pi 21 / Purchase of planting mat Request for Quota Single Stage - One E IDA / 57430 loting of Sustainable Manag Post Open - National 22,647.00 0.00 Canceled 2021-02-20 2021-03-02 2021-03-12 2021-03-29 erial for vulnerable layers in tions nvelope ement Approaches pilot zone of Frunze leskhoz IDA/IFEMP/G/SH/COVID/7/20 Strategic Investments and Pi 21 / Purchase of planting mat Request for Quota Single Stage - One E IDA / 57430 loting of Sustainable Manag Post Open - National 11,469.00 0.00 Canceled 2021-02-20 2021-03-02 2021-03-12 2021-03-29 erial for vulnerable layers in tions nvelope ement Approaches pilot zone of Balykchy leskho z IDA/IFEMP/G/SH/COVID/8/20 Strategic Investments and Pi 21 / Purchase of planting mat Request for Quota Single Stage - One E IDA / 57430 loting of Sustainable Manag Post Open - National 34,407.00 0.00 Canceled 2021-02-20 2021-03-02 2021-03-12 2021-03-29 erial for vulnerable layers in tions nvelope ement Approaches pilot zone of Kara-Kuldzha les khoz IDA/IFEMP/G/SH/COVID/9/20 Strategic Investments and Pi 21 / Purchase of planting mat Request for Quota Single Stage - One E IDA / 57430 loting of Sustainable Manag Post Open - National 26,761.00 0.00 Canceled 2021-02-20 2021-03-02 2021-03-12 2021-03-29 erial for vulnerable layers in tions nvelope ement Approaches pilot zone of Toktogul leskho z IDA/IFEMP/G/SH/COVID/13/2 Strategic Investments and Pi 021 / Purchase of planting m Request for Quota Single Stage - One E IDA / 57430 loting of Sustainable Manag Post Open - National 15,292.00 0.00 Canceled 2021-02-20 2021-03-02 2021-03-12 2021-03-29 aterial for vulnerable layers i tions nvelope ement Approaches n pilot zone of Aksy leskhoz IDA/IFEMP/G/SH/2021/1 / Pur Strategic Investments and Pi chase of planting materials t Request for Quota Single Stage - One E IDA / D0950 loting of Sustainable Manag Post Open - National 13,894.00 8,030.57 Completed 2021-03-05 2021-03-10 2021-03-16 2021-03-29 2021-04-19 2021-04-15 o promote natural forest reg tions nvelope ement Approaches eneration (At-Bashi, Naryn) IDA/IFEMP/MP/SH/2021/1 / F Strategic Investments and Pi encing forest crops (2 ha) on Request for Quota Single Stage - One E IDA / D0950 loting of Sustainable Manag Post Limited 3,220.00 3,368.68 Completed 2021-08-10 2021-11-23 2021-09-01 2021-12-24 2021-09-20 2022-02-25 the site of Kapchygai, of Kara tions nvelope ement Approaches -Zhygach Ayil Aimak, of Aksy LH IDA/IFEMP/MP/SH/2021/2 / F Strategic Investments and Pi encing of forest crops (2 ha) Request for Quota Single Stage - One E IDA / D0950 loting of Sustainable Manag Post Limited 3,305.00 3,368.02 Completed 2021-08-10 2021-11-23 2021-09-01 2021-12-24 2021-09-20 2022-02-25 on Ak-Tiken site of , of Ak-Zh tions nvelope ement Approaches ol Ayil Aimak of Aksy LH IDA/IFEMP/MP/SH/2021/3 / D Strategic Investments and Pi evelopment of beekeeping in Request for Quota Single Stage - One E IDA / D0950 loting of Sustainable Manag Post Limited 3,965.00 4,052.06 Completed 2021-08-10 2021-09-27 2021-09-01 2021-11-23 2021-09-20 2021-12-13 Zhany-Zhol village of Zhany- tions nvelope ement Approaches Zhol Ayil Aimak of Aksy LH IDA/IFEMP/MP/SH/2021/4 / D Strategic Investments and Pi evelopment of beekeeping in Request for Quota Single Stage - One E IDA / D0950 loting of Sustainable Manag Post Limited 3,205.00 3,284.89 Completed 2021-08-10 2021-09-27 2021-09-01 2021-11-23 2021-09-20 2021-12-13 Kosh-Dobo village of Kosh-D tions nvelope ement Approaches obo Ayil Aimak of Aksy LH IDA/IFEMP/MP/SH/2021/5 / R Strategic Investments and Pi estoration of apple orchards Request for Quota Single Stage - One E Pending Impl IDA / D0950 loting of Sustainable Manag Post Limited 12,165.00 0.00 2021-08-10 2021-09-01 2021-09-20 of subsidiary farm of Bel-Aldy tions nvelope ementation ement Approaches Ayil Aimak of Toktogul LH IDA/IFEMP/MP/SH/2021/6 / Cr Strategic Investments and Pi Request for Quota Single Stage - One E Pending Impl eation of an orchard in Dostu IDA / D0950 loting of Sustainable Manag Post Limited 16,282.00 0.00 2021-08-10 2021-09-01 2021-09-20 tions nvelope ementation k Ayil Aimak of Kochkor-Ata L ement Approaches H IDA/IFEMP/MP/SH/2021/7 / D Strategic Investments and Pi evelopment of beekeeping in Request for Quota Single Stage - One E Pending Impl IDA / D0950 loting of Sustainable Manag Post Limited 4,250.00 0.00 2021-08-10 2021-09-01 2021-09-20 Tunuk-Say village of Dari Ayil tions nvelope ementation ement Approaches Aimak of Batken LH IDA/IFEMP/MP/SH/2021/8 / O Strategic Investments and Pi rganizing of intensive garden Request for Quota Single Stage - One E Pending Impl IDA / D0950 loting of Sustainable Manag Post Limited 8,225.00 0.00 2021-08-10 2021-09-01 2021-09-20 in Buzhum village of Kara-Bul tions nvelope ementation ement Approaches ak Aiyl Aimak of Batken LH IDA/IFEMP/MP/SH/2021/9 / F Strategic Investments and Pi encing of 2.65 ha land to cre Request for Quota Single Stage - One E IDA / D0950 loting of Sustainable Manag Post Limited 2,910.00 3,045.41 Completed 2021-08-10 2021-11-12 2021-09-01 2021-12-01 2021-09-20 2021-12-09 ate a fruit-bearing orchard on tions nvelope ement Approaches the territory of the Kur-Sai sit e of Kara-Kulzha AO IDA/IFEMP/MP/SH/2021/10 / Planting of coniferous trees a Strategic Investments and Pi Request for Quota Single Stage - One E Pending Impl nd currants on the square of IDA / D0950 loting of Sustainable Manag Post Limited 4,180.00 0.00 2021-08-10 2021-09-01 2021-09-20 tions nvelope ementation 2 ha on the site of Konur-Dob ement Approaches o, village Chet-Nur, Naryn LH IDA/IFEMP/MP/SH/2021/11 / Strategic Investments and Pi Request for Quota Single Stage - One E Barbed wire fencing of the or IDA / D0950 loting of Sustainable Manag Post Limited 7,590.00 7,741.23 Completed 2021-08-10 2021-12-06 2021-09-01 2021-12-29 2021-09-20 2022-01-13 tions nvelope chard (35 ha.) Balykchy LH ement Approaches IDA/IFEMP/G/SH/COVID/2021 Strategic Investments and Pi /3 / Purchase of planting mat Request for Quota Single Stage - One E IDA / 57430 loting of Sustainable Manag Post Open - National 30,408.00 11,399.52 Completed 2021-09-29 2021-10-08 2021-10-18 2021-11-02 2021-11-18 2021-11-30 erial for vulnerable layers in tions nvelope ement Approaches pilot zone of Kara-Kuldzha les khoz IDA/IFEMP/G/SH/COVID/2021 Strategic Investments and Pi /4 / Purchase of planting mat Request for Quota Single Stage - One E IDA / 57430 loting of Sustainable Manag Post Open - National 14,725.00 5,380.34 Completed 2021-09-29 2021-10-08 2021-10-18 2021-11-05 2021-11-18 2021-12-21 erial for vulnerable layers in tions nvelope ement Approaches pilot zone of Toktogul leskho z IDA/IFEMP/G/SH/COVID/2021 Strategic Investments and Pi /5 / Purchase of planting mat Request for Quota Single Stage - One E IDA / 57430 loting of Sustainable Manag Post Open - National 6,683.00 2,486.47 Completed 2021-09-29 2021-10-08 2021-10-18 2021-11-05 2021-11-18 2021-12-23 erial for vulnerable layers in tions nvelope ement Approaches pilot zone of Aksy leskhoz IDA/IFEMP/G/SH/COVID/2021 Strategic Investments and Pi /6 / Purchase of planting mat Request for Quota Single Stage - One E IDA / 57430 loting of Sustainable Manag Post Open - National 7,216.00 2,780.67 Completed 2021-09-29 2021-10-08 2021-10-18 2021-11-15 2021-11-18 2021-11-24 erial for vulnerable layers in tions nvelope ement Approaches pilot zone of Kochkor-Ata les khoz IDA/IFEMP/G/SH/COVID/2021 Strategic Investments and Pi /7 / Purchase of planting mat Request for Quota Single Stage - One E IDA / 57430 loting of Sustainable Manag Post Open - National 34,216.00 17,814.58 Completed 2021-09-27 2022-01-20 2022-03-07 2022-02-21 2022-04-07 2022-03-15 erial for vulnerable layers in tions nvelope ement Approaches pilot zone of Talas leskhoz IDA/IFEMP/G/SH/COVID/2021 Strategic Investments and Pi /8 / Purchase of planting mat Request for Quota Single Stage - One E IDA / 57430 loting of Sustainable Manag Post Open - National 41,969.00 20,903.69 Completed 2021-09-27 2022-01-20 2022-03-07 2022-02-21 2022-04-07 2022-03-15 erial for vulnerable layers in tions nvelope ement Approaches pilot zone of At-Bashy leskho z Page 5 IDA/IFEMP/G/SH/COVID/2021 Strategic Investments and Pi /9 / Purchase of planting mat Request for Quota Single Stage - One E IDA / 57430 loting of Sustainable Manag Post Open - National 26,228.00 13,655.54 Completed 2021-09-27 2022-01-20 2022-03-07 2022-02-21 2022-04-07 2022-03-23 erial for vulnerable layers in tions nvelope ement Approaches pilot zone of Naryn leskhoz IDA/IFEMP/G/SH/COVID/2021 Strategic Investments and Pi /10 / Purchase of planting ma Request for Quota Single Stage - One E IDA / 57430 loting of Sustainable Manag Post Open - National 10,704.00 5,573.12 Completed 2021-09-27 2022-01-20 2022-03-07 2022-02-21 2022-04-07 2022-03-15 terial for vulnerable layers in tions nvelope ement Approaches pilot zone of Karakol leskhoz IDA/IFEMP/INVEST/G/SH/202 Strategic Investments and Pi 2/1 / Purchase of planting ma Request for Quota Single Stage - One E IDA / D0950 loting of Sustainable Manag Post Open - National 45,000.00 17,581.64 Completed 2022-01-25 2022-01-31 2022-02-14 2022-03-04 2022-03-16 2022-04-06 terials to promote natural for tions nvelope ement Approaches est regeneration (Balykchy,K arakol) NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KG-IFEMP- CQS-DESIGN ESTI MATES -05-2019 / Company f Strategic Investments and Pi Consultant Qualifi or the development of design IDA / D0950 loting of Sustainable Manag Post Open - National 280,000.00 226,378.64 Completed 2019-06-19 2019-06-21 2019-07-10 2019-06-27 2019-07-12 2019-09-16 2019-08-19 2019-10-25 2019-08-23 2019-10-28 2019-11-25 2020-06-19 cation Selection estimates documetation for b ement Approaches ridges,greenhouses, irrigatio n systems KG-IFEMP- CQS-DESIGN ESTI MATES -04-2019 / Company f Strategic Investments and Pi Consultant Qualifi or the development of design IDA / D0950 loting of Sustainable Manag Post Open - National 280,000.00 210,962.72 Completed 2019-06-10 2019-06-28 2019-07-01 2019-07-15 2019-07-12 2019-09-16 2019-08-19 2019-10-25 2019-08-23 2019-10-28 2019-12-23 2020-06-19 cation Selection estimates documentation for ement Approaches cordons, drying shops and re frigerators KG-IFEMP-CQS-DES.ESTIMAT Strategic Investments and Pi ES-06-2019 / Design of const Consultant Qualifi IDA / D0950 loting of Sustainable Manag Post Open - National 78,427.00 56,237.29 Completed 2019-11-08 2019-11-14 2019-11-29 2019-11-14 2019-12-13 2019-12-20 2019-12-20 2020-01-27 2019-12-27 2020-01-27 2020-03-06 2021-01-21 ruction, repair and reconstru cation Selection ement Approaches ction of pilot leshoz facilities KG-IFEMP-CQS-DES.ESTIMAT ES-07-2020 / Development of Strategic Investments and Pi design estimate documentati Consultant Qualifi IDA / D0950 loting of Sustainable Manag Post Open - National 216,000.00 102,105.18 Completed 2020-02-07 2020-02-05 2020-02-28 2020-02-06 2020-03-12 2020-05-17 2020-04-09 2020-05-14 2020-04-15 2020-05-18 2020-07-22 2020-12-04 on for construction, repair an cation Selection ement Approaches d reconstruction of processi ng shops and cold storage fa cilities in pilot leskhozes IFEMP-CQS-SUPERVISION-09- Strategic Investments and Pi Consultant Qualifi 2020 / Company for providin IDA / D0950 loting of Sustainable Manag Post Open - National 150,000.00 140,943.69 Signed 2020-05-08 2020-06-23 2020-05-15 2020-07-15 2020-06-16 2020-08-17 2020-06-29 2020-09-08 2020-07-01 2020-09-10 2021-07-01 cation Selection g technical supervision ement Approaches IDA/IFEMP/CS/CQS/2022/2 / Strategic Investments and Pi Consultant Qualifi Under Implement Company for providing techn IDA / D0950 loting of Sustainable Manag Post Open - National 53,000.00 0.00 2022-02-16 2022-02-18 2022-02-18 2022-03-03 2022-03-11 2022-04-25 2022-03-30 2022-04-01 2022-09-30 cation Selection ation ical supervision ement Approaches INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KG-IFEMP-CS-INT-FA-01/201 8 / Selection of individual con Forest Sector Institutional Re IDA / D0950 Prior Direct Selection Direct 50,000.00 0.00 Canceled 2018-05-23 2018-05-23 2018-05-24 2018-05-27 2018-12-02 sultant for functional and inst form itutional review of Kyrgyz For estry KG-SAEPF-CS-ENV-SAFEGUA RD-INDV / Selection of Individ Information and Monitoring Individual Consult ual consultant (national) for IDA / 57430 Post Limited 10,000.00 33,797.40 Completed 2018-05-23 2018-05-31 2018-05-28 2018-06-01 2018-06-18 2018-06-05 2018-07-23 2018-07-06 2019-01-19 2021-09-30 and Evaluation ant Selection providing of consulting servic es on Environmental Safegua rd KG-SAEPF-CS-SOCIALSAFEG UARD-INDV / Selection of Indi Information and Monitoring Individual Consult vidual consultant (national) f IDA / 57430 Post Limited 10,000.00 43,175.70 Completed 2018-05-24 2018-05-31 2018-05-29 2018-06-01 2018-06-19 2018-06-15 2018-07-24 2018-07-23 2019-01-20 2022-03-01 and Evaluation ant Selection or providing of consulting ser vices on Social Safeguard CS-NAT-FA-01-2018 / Selecti Forest Sector Institutional Re Individual Consult on of national consultant for IDA / D0950 Post Limited 10,000.00 5,448.81 Completed 2018-05-25 2018-05-29 2018-05-28 2018-05-30 2018-05-29 2018-06-06 2018-05-31 2018-06-14 2018-11-27 2019-01-30 form ant Selection Functional analyzing of Kyrgy z Forest Sector KG-SAEPF-64439-CS-INDV / Selection of individual consul Forest Sector Institutional Re Individual Consult tant for functional and institu IDA / D0950 Post Limited 50,000.00 33,224.00 Completed 2018-05-29 2018-05-31 2018-06-01 2018-04-17 2018-06-04 2018-06-07 2018-06-08 2018-06-12 2018-10-16 2019-01-30 form ant Selection tional review of the forestry s ector of the Kyrgyz Republic SSS-PIUDATABASE-009/2018 / IT specialist on developmen Project Management, Monito t of database for the Integrat IDA / D0950 Post Direct Selection Direct 8,000.00 8,137.84 Completed 2018-07-31 2018-07-26 2018-08-03 2018-08-05 2018-08-24 2019-01-06 2019-04-30 ring and Evaluation ed Forest Ecosystem Manage ment Project of the Kyrgyz R epublic CS- CCC/JFMC-02-1/2018 / PI Forest Sector Institutional Re Individual Consult IDA / D0950 Post Limited 6,750.00 6,589.93 Completed 2018-02-12 2018-01-31 2018-03-17 2018-02-23 2018-04-09 2018-04-20 2018-05-23 2018-05-08 2019-05-08 2019-05-08 U Local Focal Point form ant Selection CS- CCC/JFMC-02-2/2018 / PI Forest Sector Institutional Re Individual Consult IDA / D0950 Post Limited 6,750.00 11,748.93 Completed 2018-02-12 2018-01-31 2018-03-17 2018-02-23 2018-04-09 2018-04-20 2018-05-23 2018-05-08 2019-05-08 2019-10-18 U Local Focal Point form ant Selection CS- CCC/JFMC-02-3/2018 / PI Forest Sector Institutional Re Individual Consult IDA / D0950 Post Limited 7,100.00 19,413.24 Signed 2018-02-12 2018-01-31 2018-03-17 2018-02-23 2018-04-09 2018-04-20 2018-05-23 2018-05-08 2019-05-08 U Local Focal Point form ant Selection Page 6 CS- CCC/JFMC-02-4/2018 / PI Forest Sector Institutional Re Individual Consult IDA / D0950 Post Limited 7,150.00 26,069.56 Signed 2018-02-12 2018-01-31 2018-03-17 2018-02-23 2018-04-09 2018-04-20 2018-05-23 2018-05-08 2019-05-08 U Local Focal Point form ant Selection CS- CCC/JFMC-02-5/2018 / PI Forest Sector Institutional Re Individual Consult IDA / D0950 Post Limited 7,250.00 24,133.53 Signed 2018-02-12 2018-01-31 2018-02-17 2018-05-18 2018-04-09 2018-07-06 2018-05-23 2018-07-13 2019-05-08 U Local Focal Point form ant Selection SSS-RTK-03-1/2018 / Develo Forest Sector Institutional Re pment of metodology of Calc IDA / D0950 Post Direct Selection Direct 10,000.00 4,985.34 Completed 2018-04-03 2018-04-04 2018-04-13 2018-04-13 2018-04-25 2018-04-25 2018-10-27 2019-06-15 form ulation the Cost of foresty wo rks SSS-RTK-03-2/2018 / Develo Forest Sector Institutional Re pment of metodology of Calc IDA / D0950 Post Direct Selection Direct 10,000.00 4,569.65 Completed 2018-04-03 2018-04-04 2018-04-13 2018-04-13 2018-04-25 2018-04-25 2018-10-27 2019-06-28 form ulation the Cost of foresty wo rks IC-MF-REGULATORY-012-201 Strategic Investments and Pi Individual Consult 8 / Expert on regulatory statu IDA / D0950 loting of Sustainable Manag Post Open 10,000.00 6,466.45 Completed 2018-09-11 2018-09-25 2018-10-12 2018-10-26 2018-10-17 2018-10-26 2018-10-31 2018-10-29 2019-04-30 2019-12-25 ant Selection s of orphan forests ement Approaches IC-MF-INVENTORY-014-2018 Strategic Investments and Pi Individual Consult / Expert on forest manageme IDA / D0950 loting of Sustainable Manag Post Open 3,000.00 2,873.98 Completed 2018-09-11 2018-09-25 2018-10-12 2018-10-26 2018-10-17 2018-10-26 2018-10-31 2018-10-29 2019-01-31 2019-10-30 ant Selection nt inventory guidelines for m ement Approaches unicipal forest IC-MF-FACILITATION-013/1-2 Strategic Investments and Pi Individual Consult 018 / Consultants for facilitati IDA / D0950 loting of Sustainable Manag Post Open 9,000.00 6,825.69 Completed 2018-09-11 2018-09-25 2018-10-12 2018-10-26 2018-10-17 2018-10-26 2018-10-31 2018-10-29 2019-03-31 2019-10-31 ant Selection on in municipal forests (3 pos ement Approaches itoins) IC-MF-FACILITATION-013/2-2 Strategic Investments and Pi Individual Consult 018 / Consultants for facilitati IDA / D0950 loting of Sustainable Manag Post Open 9,000.00 8,057.07 Completed 2018-09-11 2018-09-25 2018-10-12 2018-10-26 2018-10-17 2018-10-26 2018-10-31 2018-10-29 2019-03-31 2019-10-31 ant Selection on in municipal forests (3 pos ement Approaches itoins) IC-MF-FACILITATION-013/3-2 Strategic Investments and Pi Individual Consult 018 / Consultants for facilitati IDA / D0950 loting of Sustainable Manag Post Open 9,000.00 9,069.78 Completed 2018-09-11 2018-09-25 2018-10-12 2018-10-26 2018-10-17 2018-10-26 2018-10-31 2018-10-29 2019-03-31 2019-10-31 ant Selection on in municipal forests (3 pos ement Approaches itoins) IC-FOREST CULTURES-017/2 Strategic Investments and Pi Individual Consult 018 / Consultant on devolop IDA / D0950 loting of Sustainable Manag Post Open 10,000.00 8,836.59 Completed 2018-10-05 2018-10-10 2018-11-01 2018-11-16 2018-11-02 2018-11-16 2018-11-09 2018-11-20 2019-03-09 2019-10-10 ant Selection ment forest management inv ement Approaches estment projects IC-TECHNICAL ENGENEER-01 Strategic Investments and Pi Individual Consult 5/2018 / Technical engeneer IDA / D0950 loting of Sustainable Manag Post Open 17,518.00 43,818.06 Signed 2018-10-01 2018-10-11 2018-10-26 2018-11-16 2018-10-29 2018-11-22 2018-11-05 2018-11-26 2019-11-05 ant Selection for PIU ement Approaches IC-FOREST CULTURES-017/1/ Strategic Investments and Pi 2018 / Short-term consultant Individual Consult IDA / D0950 loting of Sustainable Manag Post Open 10,000.00 9,231.94 Completed 2018-10-10 2018-10-11 2018-11-01 2018-11-16 2018-11-02 2018-11-16 2018-11-09 2018-11-20 2019-02-01 2019-10-10 on development of forest ma ant Selection ement Approaches nagement investments IC-FOOD-SAFETY-016-2019 / Strategic Investments and Pi Individual Consult Short-term consultant on the IDA / D0950 loting of Sustainable Manag Post Open 10,000.00 4,842.75 Completed 2019-07-03 2019-06-28 2019-07-25 2019-07-24 2019-07-26 2019-07-25 2019-07-31 2019-07-26 2019-11-30 2019-12-19 ant Selection organization of processing pr ement Approaches oduction IC-CFTI FRUNZE -028/2019 / Short-term consultant on org Strategic Investments and Pi anizing the logistics of Individual Consult IDA / D0950 loting of Sustainable Manag Post Open 3,000.00 2,143.49 Completed 2019-08-30 2019-08-27 2019-09-27 2019-10-29 2019-09-30 2019-10-29 2019-10-01 2019-10-30 2019-10-31 2019-12-25 "Center for Forest Technologi ant Selection ement Approaches es and Information" on the b asis of the Frunze LH IC-FS.TOURISM-027/2019 / S Strategic Investments and Pi hort-term consultant on the d Individual Consult IDA / D0950 loting of Sustainable Manag Post Open 10,000.00 5,174.09 Completed 2019-09-06 2019-09-10 2019-10-25 2019-11-01 2019-10-25 2019-11-04 2019-10-31 2019-11-06 2020-02-29 2020-04-27 evelopment of feasibility stu ant Selection ement Approaches dies, logistics and organizatio n of tourist facilities IC(NAT)-02-6-2019 / PIU Loc Forest Sector Institutional Re Individual Consult al Focal Point in Ysyk-Kul and IDA / D0950 Post Open 9,000.00 20,531.65 Signed 2019-10-25 2019-10-30 2019-11-22 2019-11-26 2019-11-25 2019-11-29 2019-12-01 2019-12-02 2020-12-01 form ant Selection Naryn oblast IC-LSGB-029/2019 / Short-te Strategic Investments and Pi Individual Consult rm Consultant 1 for develop IDA / D0950 loting of Sustainable Manag Post Open 4,000.00 3,650.19 Completed 2019-11-06 2019-10-29 2019-11-29 2019-11-27 2019-12-02 2019-11-29 2019-12-09 2019-12-02 2020-03-09 2020-03-02 ant Selection ment of projects on restorati ement Approaches on of LSGB IC-LSGB-030/2019 / Short-te Strategic Investments and Pi rm Consultant 2 for develop Individual Consult IDA / D0950 loting of Sustainable Manag Post Open 4,000.00 3,470.99 Completed 2019-11-06 2019-10-29 2019-11-29 2019-11-27 2019-12-02 2019-11-29 2019-12-09 2019-12-02 2020-03-09 2020-03-02 ment of projects on restorati ant Selection ement Approaches on of degraded municipal for ests IC-MAPPING-01/2020 / Consu Strategic Investments and Pi Individual Consult ltant on municipal forests ma IDA / D0950 loting of Sustainable Manag Post Open 6,000.00 4,800.50 Terminated 2020-01-31 2020-02-05 2020-02-26 2020-03-04 2020-02-28 2020-03-10 2020-03-05 2020-03-11 2020-07-05 ant Selection pping ement Approaches IC-CONST.SUPERVISION-05-2 Strategic Investments and Pi Individual Consult 020 / Construction supervisio IDA / D0950 loting of Sustainable Manag Post Open 18,000.00 13,792.24 Signed 2020-04-22 2020-04-24 2020-05-12 2020-05-21 2020-05-14 2020-06-01 2020-05-21 2020-06-01 2021-05-21 ant Selection n consultant ement Approaches IC(SSS)-EVAL.SPECIAL EQUIP Strategic Investments and Pi .06-2020 / Technical expert o IDA / D0950 loting of Sustainable Manag Post Direct Selection Direct 500.00 777.01 Completed 2020-04-22 2020-05-07 2020-04-30 2020-05-12 2020-05-06 2020-05-15 2020-09-06 2021-01-26 n special equipment evaluati ement Approaches on IC(SSS)-MF-07-2020 / Consul Strategic Investments and Pi tant under sub-component 2. IDA / D0950 loting of Sustainable Manag Post Direct Selection Direct 7,000.00 5,685.86 Signed 2020-06-10 2020-06-17 2020-06-12 2020-06-26 2020-06-15 2020-07-01 2021-06-15 3 ement Approaches IC-DIS-09-2020 / Technical S upervision Consultant on the Strategic Investments and Pi Individual Consult installation of a drip irrigation IDA / D0950 loting of Sustainable Manag Post Open 7,500.00 3,237.79 Terminated 2020-08-28 2020-09-01 2020-09-24 2020-09-30 2020-09-25 2020-10-19 2020-09-29 2020-10-21 2021-01-29 ant Selection system, fencing, and other pr ement Approaches ojects of the municipality and pilot leskhozes IFEMP-COMPANY-SSS-1-2020 Strategic Investments and Pi / Author's supervision over th IDA / D0950 loting of Sustainable Manag Post Direct Selection Direct 20,000.00 9,821.94 Signed 2020-09-22 2020-09-18 2020-09-25 2020-12-15 2020-10-03 2020-12-30 2021-06-30 e construction of cordon hou ement Approaches ses and greenhouses IFEMP-COMPANY-SSS-2-2020 Strategic Investments and Pi / Author's supervision over th IDA / D0950 loting of Sustainable Manag Post Direct Selection Direct 20,000.00 8,127.26 Signed 2020-09-22 2020-10-14 2020-09-25 2020-10-22 2020-10-03 2020-12-24 2021-06-30 e construction of bridges, irri ement Approaches gation systems, power trans mission lines Page 7 IC-CONST.SUPERVISION-06-2 Strategic Investments and Pi Individual Consult 020 / Construction Supervisio IDA / D0950 loting of Sustainable Manag Post Open 15,000.00 11,278.71 Signed 2020-09-23 2020-09-29 2020-10-13 2020-11-05 2020-10-13 2020-11-13 2020-10-15 2020-11-16 2021-09-15 ant Selection n Consultant ement Approaches IDA/IFEMP/CS/SSS/2021/1 / A Strategic Investments and Pi uthor's supervision over the IDA / D0950 loting of Sustainable Manag Post Direct Selection Direct 10,000.00 6,196.09 Signed 2021-04-27 2021-06-18 2021-05-14 2021-06-29 2021-06-03 2021-08-10 2022-06-03 construction of processing sh ement Approaches ops and cold storage facilitie s in pilot leshozes IDA/IFEMP/CS/SSS/2021/2 / A Strategic Investments and Pi uthor's supervision over the IDA / D0950 loting of Sustainable Manag Post Direct Selection Direct 10,000.00 2,341.16 Signed 2021-06-09 2021-06-29 2021-06-29 2021-07-08 2021-07-01 2021-08-06 2022-07-01 construction of facilities (ad ement Approaches mimistrative offices) in pilot l eskhozes Strategic Investments and Pi IDA/IFEMP/CS/IC/2021/1 / Te Individual Consult IDA / D0950 loting of Sustainable Manag Post Open 17,000.00 11,554.02 Signed 2021-06-21 2021-06-29 2021-07-20 2021-07-29 2021-08-02 2021-08-18 2021-08-08 2021-08-20 2022-08-08 chnical Engineer ant Selection ement Approaches Strategic Investments and Pi IDA/IFEMP/CS/IC/2021/2 / Civ Individual Consult IDA / D0950 loting of Sustainable Manag Post Open 16,000.00 8,838.61 Signed 2021-06-30 2021-07-08 2021-07-22 2021-08-16 2021-07-29 2021-08-18 2021-08-02 2021-08-20 2022-08-02 il Engineer ant Selection ement Approaches IDA/IFEMP/IC/2022/1 / Short Information and Monitoring Individual Consult term consultant on Environm IDA / D0950 Post Limited 4,000.00 3,720.48 Signed 2022-03-14 2022-03-15 2022-03-16 2022-03-26 2022-03-25 2022-04-05 2022-04-01 2022-04-08 2022-09-30 and Evaluation ant Selection ental Safeguards (part-time) IDA/IFEMP/IC/2022/2 / Short Information and Monitoring Individual Consult term consultant on Social Saf IDA / D0950 Post Limited 4,000.00 3,720.48 Signed 2022-03-14 2022-03-15 2022-03-16 2022-03-26 2022-03-25 2022-04-05 2022-04-01 2022-04-08 2022-09-30 and Evaluation ant Selection eguards (part-time) IDA/IFEMP/IC/2022/3 / Consu Strategic Investments and Pi Individual Consult ltant for technical supervisio IDA / D0950 loting of Sustainable Manag Post Limited 5,000.00 5,043.19 Signed 2022-05-16 2022-05-14 2022-05-18 2022-05-27 2022-05-26 2022-06-02 2022-06-01 2022-06-06 2022-09-30 ant Selection n of the construction of irriga ement Approaches tion facilities IDA/IFEMP/IC/2022/4 / Techni Strategic Investments and Pi Individual Consult Pending Impleme cal Supervision Engineer for t IDA / D0950 loting of Sustainable Manag Post Limited 3,000.00 0.00 2022-06-20 2022-06-20 2022-06-29 2022-07-01 2022-09-30 ant Selection ntation he facilities of At-Bashy and ement Approaches Naryn Pilot LH IDA/IFEMP/IC/2022/5 / Techni Strategic Investments and Pi Individual Consult Pending Impleme cal supervision engineer for t IDA / D0950 loting of Sustainable Manag Post Limited 3,000.00 0.00 2022-06-20 2022-06-20 2022-06-29 2022-07-01 2022-09-30 ant Selection ntation he facilities of the Karakol pil ement Approaches ot LH IDA/IFEMP/IC/2022/6 / Techni Strategic Investments and Pi Individual Consult Pending Impleme cal Supervision Engineer for t IDA / D0950 loting of Sustainable Manag Post Limited 3,000.00 0.00 2022-06-20 2022-06-20 2022-06-29 2022-07-01 2022-09-30 ant Selection ntation he facilities of the Chuy and ement Approaches Frunze pilot LH IDA/IFEMP/IC/2022/7 / Techni Strategic Investments and Pi Individual Consult Pending Impleme cal supervision engineer for t IDA / D0950 loting of Sustainable Manag Post Limited 3,000.00 0.00 2022-06-20 2022-06-20 2022-06-29 2022-07-01 2022-09-30 ant Selection ntation he facilities of the Talas and ement Approaches Toktogul pilot LH IDA/IFEMP/IC/2022/8 / Techni Strategic Investments and Pi Individual Consult Pending Impleme cal Supervision Engineer for IDA / D0950 loting of Sustainable Manag Post Limited 3,000.00 0.00 2022-06-20 2022-06-20 2022-06-29 2022-07-01 2022-09-30 ant Selection ntation Kara-Kuldzha, Aksy and Koch ement Approaches kor-Ata Pilot LH IDA/IFEMP/IC/2022/9 / Techni Strategic Investments and Pi Individual Consult Pending Impleme cal supervision engineer for t IDA / D0950 loting of Sustainable Manag Post Limited 3,000.00 0.00 2022-06-20 2022-06-20 2022-06-29 2022-07-01 2022-09-30 ant Selection ntation he facilities of Batken and Uc ement Approaches h-Korgon pilot LH Strategic Investments and Pi IDA/IFEMP/IC/2022/10 / Civil Individual Consult Pending Impleme IDA / D0950 loting of Sustainable Manag Post Limited 4,000.00 0.00 2022-06-20 2022-06-20 2022-06-29 2022-07-01 2022-09-30 Engineer ant Selection ntation ement Approaches Page 8