PROCUREMENT PLAN (Textual Part) Project information: FYR of Macedonia Project Implementation agency: Ministry of Labor and Social Policy Date of the Procurement Plan: October 2018 Period covered by this Procurement Plan: Duration of the Project Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. PROCUREMENT North Macedonia : Social Services Improvement Project PLAN General Information Country: North Macedonia 2018-10-22 Bank’s Approval Date of the Original Procurement Plan: 2024-12-30 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162246 GPN Date: 2018-09-18 Project Name: Social Services Improvement Project Loan / Credit No: / , IBRD / 89020 Ministry of Labor and Social Policy Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MK-MLSP-72220-CW-RFB-13 1. Promoting social inclusi 4 / Renovation of MLSP, SWC on through improved access Single Stage - One E 2020-04-2 / Prior Request for Bids Open - National 0.00 Canceled 2019-08-01 2019-08-31 2019-10-05 2019-10-22 2019-10-30 s, Municipalities, NEA and oth to social benefits and servic nvelope 7 er institutions included in the es SP system MK-MLSP-96745-CW-RFB-13 1. Promoting social inclusi Request for Quota Single Stage - One E 2019-09-3 13 / Renovation of local offic IBRD / 89020 on through improved access Post Open - National 0.00 Canceled 2019-02-06 2019-04-03 tions nvelope 0 es to social benefits and servic es MK-MLSP-122572-CW-RFB-T 2. Expanding the access to Single Stage - One E 2021-02-2 RANSFERS-2.1.1 / Civil works IBRD / 89020 and improving of the quality Prior Request for Bids Open - National 850,675.56 Signed 2019-07-14 2019-08-01 2019-08-13 2019-09-17 2019-10-04 2019-10-07 2019-12-11 2019-10-29 2020-01-22 nvelope 0 -Kindergarten in Kavadarci of preschool services MK-MLSP-123252-CW-RFB-T 2. Expanding the access to Single Stage - One E 1,237,887.3 2021-02-2 RANSFERS-2.1.1.2 / Civil wor IBRD / 89020 and improving of the quality Post Request for Bids Open - National Signed 2019-07-19 2019-09-20 2019-08-18 2019-09-22 2019-11-05 2019-10-12 2019-12-10 2019-11-06 2020-01-22 nvelope 5 8 ks-Kindergarten in Negotino of preschool services MK-MLSP-123255-CW-RFB-T 2. Expanding the access to Single Stage - One E 2021-03-0 RANSFERS-2.1.1.3 / Civil wor IBRD / 89020 and improving of the quality Post Request for Bids Open - National 934,707.05 Signed 2019-07-21 2019-10-01 2019-08-20 2019-09-24 2019-11-21 2019-10-14 2019-12-10 2019-11-08 2020-01-10 nvelope 2 ks-Kindergarten in Kocani of preschool services MK-MLSP-123257-CW-RFB-T 2. Expanding the access to Single Stage - One E 2019-11-1 RANSFERS-2.1.1.4 / Civil wor IBRD / 89020 and improving of the quality Post Request for Bids Open - National 698,448.30 Signed 2019-07-25 2019-09-27 2019-08-24 2019-09-28 2019-11-15 2019-10-18 2019-12-09 2019-11-12 2020-01-07 nvelope 5 ks-Kindergarten in Kisela Vod of preschool services a MK-MLSP-129124-CW-RFQ-1 1. Promoting social inclusi 315 / Renovation of part of th on through improved access Request for Quota Single Stage - One E 2019-12-2 e Special Institution Demir Ka IBRD / 89020 Post Open - National 0.00 Canceled 2019-09-15 2019-10-11 to social benefits and servic tions nvelope 0 pija and part of the Public Ins es titution for rehabilitation of c hildren and youth MK-MLSP-142028-CW-RFB-2. 2. Expanding the access to Single Stage - One E 2021-06-2 1.1.5 / Civil works-Kindergart IBRD / 89020 and improving of the quality Post Request for Bids Open - National 365,321.40 Signed 2019-10-25 2020-07-10 2019-11-14 2019-12-29 2020-08-25 2020-01-18 2020-09-22 2020-03-06 2020-10-23 nvelope 9 en in Kriva Palanka of preschool services MK-MLSP-142030-CW-RFB-2. 2. Expanding the access to Single Stage - One E 1,553,358.1 2021-06-2 1.1.6 / Civil works-Kindergart IBRD / 89020 and improving of the quality Post Request for Bids Open - National Signed 2019-10-25 2019-10-31 2019-11-14 2019-12-29 2019-12-17 2020-01-18 2019-12-15 2020-03-06 2020-01-30 nvelope 4 9 en in Gjorce Petrov of preschool services MK-MLSP-142033-CW-RFQ-2. 2. Expanding the access to Request for Quota Single Stage - One E 2020-08-0 1.1.7 / Civil works-Kindergart IBRD / 89020 and improving of the quality Post Open - National 187,925.59 Signed 2019-11-14 2020-02-11 2020-01-03 tions nvelope 9 en in Bogovinje of preschool services MK-MLSP-142036-CW-RFB-2. 2. Expanding the access to Single Stage - One E 2021-06-2 1.1.8 / Civil works-Kindergart IBRD / 89020 and improving of the quality Post Request for Bids Open - National 404,688.09 Signed 2019-10-25 2019-12-13 2019-11-14 2019-12-29 2019-12-16 2020-01-18 2019-12-13 2020-03-06 2020-01-18 nvelope 9 en in Resen of preschool services MK-MLSP-142040-CW-RFB-2. 2. Expanding the access to Single Stage - One E 1,945,032.9 2021-06-2 1.1.9 / Civil works-Kindergart IBRD / 89020 and improving of the quality Post Request for Bids Open - National Signed 2019-10-25 2019-10-29 2019-11-14 2019-12-29 2019-12-13 2020-01-18 2019-12-11 2020-03-06 2020-01-19 nvelope 7 9 en in Strumica of preschool services MK-MLSP-151802-CW-RFB-2. 2. Expanding the access to Single Stage - One E 2021-10-3 1.1.10 / Civil works-Kindergar IBRD / 89020 and improving of the quality Post Request for Bids Open - National 871,380.00 Signed 2020-02-10 2021-05-25 2020-03-01 2020-03-15 2021-06-23 2020-03-22 2021-07-07 2020-05-09 2021-08-31 nvelope 1 ten in Aracinovo of preschool services MK-MLSP-151803-CW-RFB-2. 2. Expanding the access to Single Stage - One E 2021-10-3 1.1.11 / Civil works-Kindergar IBRD / 89020 and improving of the quality Post Request for Bids Open - National 358,953.04 Signed 2020-02-10 2020-12-14 2020-03-01 2020-03-15 2021-01-25 2020-03-22 2021-01-29 2020-05-09 2021-03-17 nvelope 1 ten in Valandovo of preschool services MK-MLSP-151804-CW-RFB-2. 2. Expanding the access to Single Stage - One E 2021-10-3 1.1.12 / Civil works-Kindergar IBRD / 89020 and improving of the quality Post Request for Bids Open - National 439,988.48 Signed 2020-02-10 2021-04-05 2020-03-01 2020-03-15 2021-05-05 2020-03-22 2021-06-01 2020-05-09 2021-07-19 nvelope 1 ten in Karposh 2 of preschool services MK-MLSP-151805-CW-RFB-2. 2. Expanding the access to Single Stage - One E 2021-10-3 1.1.13 / Civil works-Kindergar IBRD / 89020 and improving of the quality Post Request for Bids Open - National 378,560.95 Signed 2020-02-10 2020-09-17 2020-03-01 2020-03-15 2020-10-30 2020-03-22 2020-12-14 2020-05-09 2021-02-05 nvelope 1 ten in Probistip of preschool services MK-MLSP-167801-CW-RFQ-1. 1. Promoting social inclusi 3.15 / Renovation of part of t on through improved access Request for Quota Single Stage - One E 2020-12-0 he Special Institution Demir IBRD / 89020 Post Open - National 240,879.84 Signed 2020-04-11 2020-06-06 2019-11-08 to social benefits and servic tions nvelope 3 Kapija and part of the Public I es nstitution for rehabilitation of children and youth MK-MLSP-178969-CW-RFB-2. 2. Expanding the access to Single Stage - One E 1,052,790.3 2022-02-1 1.1.16 / Civil works-Kindergar IBRD / 89020 and improving of the quality Post Request for Bids Open - National Signed 2020-07-01 2021-03-12 2020-07-06 2020-08-17 2021-04-12 2020-09-16 2021-04-14 2020-10-21 2021-06-29 nvelope 2 3 ten in Bitola of preschool services MK-MLSP-178973-CW-RFB-2. 2. Expanding the access to Single Stage - One E 2022-02-1 1.1.17 / Civil works-Kindergar IBRD / 89020 and improving of the quality Post Request for Bids Open - National 903,823.66 Signed 2020-07-01 2021-05-19 2020-07-06 2020-08-17 2021-06-17 2020-09-16 2021-07-02 2020-10-21 2021-09-07 nvelope 3 ten in Lipkovo of preschool services MK-MLSP-178976-CW-RFB-2. 2. Expanding the access to Single Stage - One E 2022-02-1 1.1.18 / Civil works-Kindergar IBRD / 89020 and improving of the quality Post Request for Bids Open - National 463,607.71 Signed 2020-07-01 2021-12-30 2020-07-06 2020-08-17 2022-02-03 2020-09-16 2022-02-08 2020-10-21 2022-04-19 nvelope 3 ten in Gostivar of preschool services MK-MLSP-178979-CW-RFB-2. 2. Expanding the access to Single Stage - One E 2022-02-1 1.1.19 / Civil works-Kindergar IBRD / 89020 and improving of the quality Post Request for Bids Open - National 0.00 Canceled 2020-07-01 2020-07-06 2020-08-17 2020-09-16 2020-10-21 nvelope 3 ten in Karposh 2 of preschool services Page 1 MK-MLSP-294611-CW-RFQ-1. 1. Promoting social inclusi Other (with fi Request for Quota Single Stage - One E 2023-01-1 3.23 / Renovation of part of C IBRD / 89020 on through improved access Post Open - National eld for expla 0.00 Signed 2022-05-20 2022-07-15 2023-01-17 tions nvelope 1 SR Strumica and PMU offices to social benefits and servic nation) es MK-MLSP-294615-CW-RFQ-2. 2. Expanding the access to Other (with fi Request for Quota Single Stage - One E 2022-09-1 1.1.3.1.1 / Civil works-Kinder IBRD / 89020 and improving of the quality Post Open - National eld for expla 0.00 Canceled 2022-05-20 2022-07-15 tions nvelope 3 garten in Kocani- installation of preschool services nation) of façade bricks Request for 1. Promoting social inclusi MK-MLSP-320130-CW-RFQ-1. Quotations - on through improved access Request for Quota Single Stage - One E 2023-03-0 3.25 / Renovation of PMU off IBRD / 89020 Post Open - National Small Works 0.00 Signed 2022-10-14 2022-12-09 2023-01-17 to social benefits and servic tions nvelope 9 ices (Emergency) es SPD -Compet itive MK-MLSP-385009-CW-RFQ-2. 2. Expanding the access to Other (with fi Request for Quota Single Stage - One E 2024-02-0 1.1.3.1.4 / Civil works-Kinder IBRD / 89020 and improving of the quality Post Open - National eld for expla 0.00 Signed 2023-10-13 2023-12-08 2023-11-17 tions nvelope 6 garten in Kocani- installation of preschool services nation) of facade bricks MK-MLSP-398579-CW-RFQ-1. 1. Promoting social inclusi Other (with fi Request for Quota Single Stage - One E Pending Imp 2024-06-3 3.30 / Renovation of the insti IBRD / 89020 on through improved access Post Open - National eld for expla 0.00 2024-01-19 2024-03-15 tions nvelope lementation 0 tution 25 May to social benefits and servic nation) es 1. Promoting social inclusi Other (with fi MK-MLSP-398587-CW-RFQ-1. Request for Quota Single Stage - One E Pending Imp 2024-06-3 IBRD / 89020 on through improved access Post Open - National eld for expla 0.00 2024-01-06 2024-03-02 3.33 / Data center tions nvelope lementation 0 to social benefits and servic nation) es Request for B MK-MLSP-403206-CW-RFB-2. 2. Expanding the access to ids - Small W 1.15 / Renovation and refurb Single Stage - One E Pending Imp 2025-06-3 IBRD / 89020 and improving of the quality Post Request for Bids Open - National orks SPD (1 e 0.00 2024-05-19 2024-05-24 2024-07-05 2024-08-04 2024-09-08 ishment of school/municipal nvelope lementation 0 of preschool services nvelope proc premises for ECEC spaces ess) MK-MLSP-463209-CW-RFQ-1. 1. Promoting social inclusi Other (with fi Request for Quota Single Stage - One E Pending Imp 2025-03-2 3.37 / Renovation and pread IBRD / 89020 on through improved access Post Open - National eld for expla 0.00 2024-11-29 2025-01-24 tions nvelope lementation 5 aptation of basement premis to social benefits and servic nation) es in CSR Kicevo es MK-MLSP-468274-CW-RFQ-2. 1.1.3.1.5 / Reconstruction of 2. Expanding the access to Other (with fi Request for Quota Single Stage - One E Pending Imp 2025-06-3 the horizontal gutter system IBRD / 89020 and improving of the quality Post Open - National eld for expla 0.00 2025-01-01 2025-02-26 tions nvelope lementation 0 and roof covering of the roof of preschool services nation) construction in the kindergar ten in Kocani Request for B MK-MLSP-468275-CW-RFB-2. 2. Expanding the access to ids - Works ( Single Stage - One E Pending Imp 2025-06-3 1.1.16.2 / Civil works-Kinderg IBRD / 89020 and improving of the quality Post Request for Bids Open - National without preq 0.00 2024-12-31 2025-01-05 2025-02-16 2025-03-18 2025-04-22 nvelope lementation 0 arden in Bitola of preschool services ualification) SPD GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MK-MLSP-72180-GO-RFB-13 1. Promoting social inclusi 1 / Development of an integr on through improved access Open - Internationa Single Stage - One E / Post Request for Bids 0.00 Canceled 2019-01-15 2020-12-23 2019-02-14 2020-12-28 2019-03-21 2019-04-07 2019-04-15 2020-04-14 ated social welfare IS coverin to social benefits and servic l nvelope g both social assistance bene es fits and services MK-MLSP-72182-GO-RFB-13 1. Promoting social inclusi Single Stage - One E 2 / Hardware equipment for t / on through improved access Post Request for Bids Open - National 0.00 Signed 2019-03-01 2023-06-20 2019-03-21 2019-04-25 2023-07-19 2019-05-05 2023-08-03 2019-05-13 2023-10-16 2019-11-09 nvelope he MLSP and the social instit to social benefits and servic utions es MK-MLSP-72678-GO-RFB-22 2. Expanding the access to Single Stage - One E 3 / Training for pre-primary s / and improving of the quality Post Request for Bids Open - National 0.00 Canceled 2019-01-15 2019-02-04 2019-03-11 2019-03-21 2019-03-29 2020-03-28 nvelope chool program of preschool services 2. Expanding the access to MK-MLSP-72679-GO-RFB-22 Single Stage - One E / and improving of the quality Post Request for Bids Open - National 0.00 Canceled 2019-02-15 2019-03-07 2019-04-11 2019-04-21 2019-04-29 2020-04-28 4 / In service teacher training nvelope of preschool services MK-MLSP-77087-GO-RFQ-31 3. Project Management, M Request for Quota Single Stage - One E / Post Open - National 26,617.47 Signed 2019-01-09 2019-02-04 2019-12-15 2019-04-05 18 / Equipment (4 years ) onitoring and Evaluation tions nvelope MK-MLSP-93096-GO-DIR-131 1. Promoting social inclusi 0 / Maintenance and Upgrade IBRD / 89020 on through improved access Prior Direct Selection Direct 0.00 Canceled 2019-01-03 2019-01-08 2019-02-12 2021-01-02 of CBMIS to social benefits and servic es MK-MLSP-94588-GO-RFQ-31 3. Project Management, M Request for Quota Single Stage - One E IBRD / 89020 Post Open - National 15,750.48 Signed 2019-02-09 2019-03-07 2019-08-06 2019-04-06 21 / Camera and Recording d onitoring and Evaluation tions nvelope evices MK-MLSP-94585-GO-DIR-131 1. Promoting social inclusi 0 / Maintenance and Upgrade IBRD / 89020 on through improved access Prior Direct Selection Direct 363,357.44 Signed 2019-01-21 2019-01-28 2019-01-26 2019-01-30 2019-03-02 2019-02-08 2021-03-01 of CBMIS to social benefits and servic es MK-MLSP-96729-GO-RFB-13 1. Promoting social inclusi Single Stage - One E 11 / Hardware equipment for IBRD / 89020 on through improved access Prior Request for Bids Open - National 192,099.49 Signed 2019-02-01 2019-09-24 2019-03-03 2019-04-07 2019-11-08 2019-04-24 2019-11-21 2019-05-02 2020-01-07 2019-10-29 nvelope the local offices and the MLS to social benefits and servic P es MK-MLSP-96739-GO-RFQ-13 1. Promoting social inclusi Request for Quota Single Stage - One E 12 / Furniture for the local off IBRD / 89020 on through improved access Post Open - National 0.00 Canceled 2019-02-10 2019-03-08 2019-09-04 tions nvelope ices to social benefits and servic es MK-MLSP-77092-GO-RFQ-32 3. Project Management, M Request for Quota Single Stage - One E / Prior Open - National 0.00 Canceled 2019-02-15 2019-03-18 2019-05-17 6 / Vehicles (2) onitoring and Evaluation tions nvelope MK-MLSP-122570-GO-RFQ-3 3. Project Management, M Request for Quota Single Stage - One E IBRD / 89020 Prior Open - National 0.00 Canceled 2019-07-27 2019-09-02 2019-12-01 28 / Procurement of Vehicles onitoring and Evaluation tions nvelope (2) MK-MLSP-129121-GO-RFQ-1 1. Promoting social inclusi Request for Quota Single Stage - One E 314 / Furniture for the Center IBRD / 89020 on through improved access Post Open - National 22,554.84 Signed 2019-09-10 2019-10-24 2019-11-23 2019-12-23 tions nvelope for Cerebral palsy to social benefits and servic es MK-MLSP-129129-GO-DIR-13 1. Promoting social inclusi 16 / Upgrade of CBMIS-SSIP F IBRD / 89020 on through improved access Post Direct Selection Direct 10,079.30 Signed 2019-09-10 2019-10-01 2019-09-15 2019-10-01 2019-09-25 2019-11-29 2020-03-23 inancial module to social benefits and servic es MK-MLSP-169710-GO-RFQ-2. 1.1.14 / Furnishing and equi 2. Expanding the access to pment for the kindergarten i Request for Quota Single Stage - One E IBRD / 89020 and improving of the quality Post Open - National 97,878.71 Completed 2020-05-06 2020-07-01 2020-08-20 2020-08-30 n the municipality of Bogovin tions nvelope of preschool services je (village of Kamenjane), inc luding outside playground eq uipment Page 2 MK-MLSP-173421-GO-RFQ-2. 1.1.15 / Furnishing and equi 2. Expanding the access to Request for Quota Single Stage - One E pment for the kindergarten i IBRD / 89020 and improving of the quality Post Open - National 131,723.10 Completed 2020-06-06 2020-08-01 2020-08-18 2020-09-10 tions nvelope n the municipality of Resen , of preschool services including outside playground equipment MK-MLSP-173425-GO-RFQ-3. 3. Project Management, M Request for Quota Single Stage - One E IBRD / 89020 Post Open - National 27,217.36 Signed 2020-06-06 2020-08-01 2020-08-11 2020-08-31 1.32 / Antivirus licenses onitoring and Evaluation tions nvelope MK-MLSP-173432-GO-RFQ-3. 3. Project Management, M Request for Quota Single Stage - One E 2.9 / Procurement of hardwar IBRD / 89020 Post Open - National 33,581.06 Signed 2020-07-06 2020-08-31 2020-08-28 2020-11-29 onitoring and Evaluation tions nvelope e equipment MK-MLSP-178981-GO-RFQ-2. 2. Expanding the access to Request for Quota Single Stage - One E 2.18 / Printing of age approp IBRD / 89020 and improving of the quality Post Open - National 41,603.07 Signed 2020-07-06 2020-08-31 2021-03-06 2020-09-30 tions nvelope riate teaching-learning mater of preschool services ials MK-MLSP-196377-GO-DIR-2. 2. Expanding the access to 2.19 / Distribution of age ap IBRD / 89020 and improving of the quality Post Direct Selection Direct 6,123.38 Signed 2020-09-30 2020-10-06 2020-10-05 2020-10-06 2020-11-09 2020-10-19 2020-12-24 propriate teaching-learning of preschool services materials MK-MLSP-203864-GO-RFB-2. 1.1.1.1 / Furnishing and equi 2. Expanding the access to Single Stage - One E pment for the kindergarten i IBRD / 89020 and improving of the quality Post Request for Bids Open - National 0.00 Canceled 2020-12-01 2020-12-06 2021-01-17 2021-02-16 2021-03-23 2021-06-21 nvelope n the municipality of Kavadar of preschool services ci , including outside playgro und equipment MK-MLSP-203865-GO-RFB-2. 1.1.2.1 / Furnishing and equi 2. Expanding the access to Single Stage - One E pment for the kindergarten i IBRD / 89020 and improving of the quality Post Request for Bids Open - National 165,589.37 Completed 2020-12-01 2020-12-04 2020-12-06 2021-01-17 2021-01-15 2021-02-16 2021-01-29 2021-03-23 2021-05-01 2021-06-21 2021-08-03 nvelope n the municipality of Negotin of preschool services o , including outside playgrou nd equipment MK-MLSP-203867-GO-RFQ-2. 1.1.3.1 / Furnishing and equi 2. Expanding the access to Request for Quota Single Stage - One E pment for the kindergarten i IBRD / 89020 and improving of the quality Post Open - National 122,262.75 Completed 2020-12-06 2021-01-31 2021-07-30 2021-05-01 2021-12-03 tions nvelope n the municipality of Kocani , of preschool services including outside playground equipment MK-MLSP-203869-GO-RFQ-2. 1.1.4.1 / Furnishing and equi 2. Expanding the access to Request for Quota Single Stage - One E pment for the kindergarten i IBRD / 89020 and improving of the quality Post Open - National 82,835.63 Completed 2020-12-06 2021-01-31 2021-09-14 2021-05-01 2021-09-24 tions nvelope n the municipality of Kisela V of preschool services oda , including outside playgr ound equipment MK-MLSP-203872-GO-RFQ-2. 1.1.6.1 / Furnishing and equi 2. Expanding the access to Request for Quota Single Stage - One E pment for the kindergarten i IBRD / 89020 and improving of the quality Post Open - National 120,852.03 Completed 2020-12-06 2021-01-31 2021-08-16 2021-05-01 2021-10-26 tions nvelope n the municipality of Gjorce P of preschool services etrov , including outside play ground equipment MK-MLSP-226423-GO-RFQ-2. 1.1.2.1.2 / Furnishing and eq uipment for the kindergarten 2. Expanding the access to Request for Quota Single Stage - One E in the municipality of Negotin IBRD / 89020 and improving of the quality Post Open - National 11,415.11 Completed 2021-04-06 2021-06-01 2021-08-02 2021-07-01 tions nvelope o-Procurement, delivery and i of preschool services nstallation of Didactic equip ment and Procurement of mo vable partition panels MK-MLSP-234592-GO-RFQ-2. 1.1.1.1 / Furnishing and equi 2. Expanding the access to Request for Quota Single Stage - One E pment for the kindergarten i IBRD / 89020 and improving of the quality Post Open - National 160,804.18 Completed 2021-05-21 2021-07-16 2021-09-11 2021-09-14 2021-11-25 tions nvelope n the municipality of Kavadar of preschool services ci , including outside playgro und equipment MK-MLSP-240823-GO-RFQ-2. 2. Expanding the access to Request for Quota Single Stage - One E 2.21 / Distribution of age ap IBRD / 89020 and improving of the quality Post Open - National 4,283.57 Signed 2021-07-02 2021-08-27 2021-07-27 2021-11-25 tions nvelope propriate teaching-learning of preschool services materials MK-MLSP-245169-GO-RFB-2. 1.1.9.1 / Furnishing and equi 2. Expanding the access to Single Stage - One E pment for the kindergarten i IBRD / 89020 and improving of the quality Post Request for Bids Open - National 71,404.75 Completed 2021-07-29 2021-07-27 2021-08-03 2021-09-14 2021-08-25 2021-10-14 2021-11-01 2021-11-18 2021-12-04 2022-01-27 2022-03-19 nvelope n the municipality of Strumic of preschool services a , including outside playgrou nd equipment MK-MLSP-245188-GO-RFB-1. 1. Promoting social inclusi 3.1 / Development of an inte on through improved access Open - Internationa Single Stage - One E IBRD / 89020 Post Request for Bids 315,824.51 Signed 2021-08-15 2021-12-01 2021-08-20 2022-02-21 2021-10-01 2022-04-12 2021-10-31 2022-06-14 2021-12-05 2022-09-05 2024-06-30 grated social welfare IS cover to social benefits and servic l nvelope ing both social assistance be es nefits and services MK-MLSP-246187-GO-RFQ-2. 1.1.5.1 / Furnishing and equi 2. Expanding the access to Request for Quota Single Stage - One E pment for the kindergarten i IBRD / 89020 and improving of the quality Post Open - National 81,941.54 Completed 2021-09-06 2021-11-01 2022-05-01 2022-01-10 2022-08-02 tions nvelope n the municipality of Kriva Pa of preschool services lanka , including outside play ground equipment MK-MLSP-246809-GO-RFQ-3. 3. Project Management, M Request for Quota Single Stage - One E IBRD / 89020 Post Open - National 0.00 Canceled 2021-11-06 2022-01-01 2022-04-01 2.8 / Procurement of vehicles onitoring and Evaluation tions nvelope (2) MK-MLSP-266952-GO-RFQ-2. 1.1.9.1.2 / Furnishing and eq 2. Expanding the access to uipment for the kindergarten Request for Quota Single Stage - One E IBRD / 89020 and improving of the quality Post Open - National 197,985.97 Completed 2021-12-24 2022-02-18 2022-03-06 2022-05-19 2022-06-10 in the municipality of Strumic tions nvelope of preschool services a , including outside playgrou nd equipment (LOT 1 and LO T 5) MK-MLSP-266959-GO-RFQ-2. 1.1.11.1 / Furnishing and eq 2. Expanding the access to Request for Quota Single Stage - One E uipment for the kindergarten IBRD / 89020 and improving of the quality Post Open - National 93,450.92 Completed 2022-01-14 2022-03-11 2022-04-23 2022-06-09 2022-06-17 tions nvelope in the municipality of Valand of preschool services ovo, including outside playgr ound equipment MK-MLSP-266964-GO-RFQ-3. 3. Project Management, M Request for Quota Single Stage - One E Pending Impl 1.41 / Hardware equipment f IBRD / 89020 Post Open - National 0.00 2021-12-24 2022-02-18 2022-04-19 onitoring and Evaluation tions nvelope ementation or PMU/MLSP MK-MLSP-276137-GO-RFQ-2. 1.1.10.1 / Furnishing and eq 2. Expanding the access to Request for Quota Single Stage - One E uipment for the kindergarten IBRD / 89020 and improving of the quality Post Open - National 0.00 Canceled 2022-02-20 2022-04-17 2022-10-14 tions nvelope in the municipality of Aracino of preschool services vo , including outside playgro und equipment Page 3 MK-MLSP-276140-GO-RFQ-2. 1.1.13.1 / Furnishing and eq 2. Expanding the access to Request for Quota Single Stage - One E uipment for the kindergarten IBRD / 89020 and improving of the quality Post Open - National 0.00 Completed 2022-02-20 2022-04-17 2022-10-25 2022-10-14 2022-12-26 tions nvelope in the municipality of Probish of preschool services tip , including outside playgr ound equipment MK-MLSP-276142-GO-RFQ-2. 1.1.17.1 / Furnishing and eq 2. Expanding the access to Request for Quota Single Stage - One E uipment for the kindergarten IBRD / 89020 and improving of the quality Post Open - National 0.00 Completed 2022-02-20 2022-04-17 2023-09-20 2022-10-14 2023-12-05 tions nvelope in the municipality of Lipkovo of preschool services , including outside playgroun d equipment MK-MLSP-294617-GO-RFQ-3. 3. Project Management, M Request for Quota Single Stage - One E 1.44 / Hardware equipment f IBRD / 89020 Post Open - National 13,098.18 Completed 2022-05-20 2022-07-15 2022-08-10 2022-10-13 2022-10-11 onitoring and Evaluation tions nvelope or MLSP/PMU MK-MLSP-303385-GO-RFQ-2. 1.1.12.1 / Furnishing and eq 2. Expanding the access to Request for Quota Single Stage - One E uipment for the kindergarten IBRD / 89020 and improving of the quality Post Open - National 0.00 Completed 2022-07-15 2022-09-09 2022-11-07 2022-11-08 2022-11-29 tions nvelope in the municipality of Karpos of preschool services h 2 , including outside playgr ound equipment MK-MLSP-312230-GO-RFB-2. 1.1.10.1 / Furnishing and equ 2. Expanding the access to Single Stage - One E ipment for the kindergarten i IBRD / 89020 and improving of the quality Post Request for Bids Open - National 0.00 Completed 2022-08-31 2022-09-27 2022-09-05 2022-10-17 2022-10-25 2022-11-16 2022-12-01 2022-12-21 2023-02-15 2022-12-31 2023-04-24 nvelope n the municipality of Aracino of preschool services vo , including outside playgro und equipment MK-MLSP-326141-GO-RFQ-2. 2. Expanding the access to Request for Quota Single Stage - One E 1.1.3.1.2 / Equipment-Kinder IBRD / 89020 and improving of the quality Post Open - National 0.00 Signed 2022-11-18 2023-01-13 2023-01-23 2023-03-14 tions nvelope garten in Kocani- aluminum s of preschool services liding doors MK-MLSP-334037-GO-RFQ-1. 1. Promoting social inclusi Request for Quota Single Stage - One E 3.26 / Furniture for CSR Stru IBRD / 89020 on through improved access Post Open - National 0.00 Completed 2023-01-20 2023-03-17 2023-04-10 2023-05-16 2023-06-07 tions nvelope mica to social benefits and servic es MK-MLSP-334040-GO-RFB-2. 1.1.16.1 / Furnishing and eq 2. Expanding the access to Single Stage - One E uipment for the kindergarten IBRD / 89020 and improving of the quality Post Request for Bids Open - National 0.00 Signed 2023-02-01 2023-12-01 2023-02-06 2023-03-20 2023-12-25 2023-04-19 2024-01-17 2023-05-24 2024-02-02 2023-07-23 nvelope in the municipality of Bitola, i of preschool services ncluding outside playground equipment MK-MLSP-334042-GO-RFQ2. 1.1.18.1 / Furnishing and eq 2. Expanding the access to Request for Quota Single Stage - One E uipment for the kindergarten IBRD / 89020 and improving of the quality Post Open - National 0.00 Completed 2023-02-20 2023-04-17 2023-07-07 2023-06-16 2023-10-20 tions nvelope in the municipality of Gostiva of preschool services r , including outside playgrou nd equipment MK-MLSP-339228-GO-RFQ-2. 1.1.10.1.1 / Furnishing and e 2. Expanding the access to quipment for the kindergarte Request for Quota Single Stage - One E IBRD / 89020 and improving of the quality Post Open - National 0.00 Completed 2023-02-10 2023-04-07 2023-05-19 2023-07-06 2023-07-03 n in the municipality of Araci tions nvelope of preschool services novo (didactic materials and outside playground equipme nt) MK-MLSP-365811-GO-RFQ-2. 2. Expanding the access to Request for Quota Single Stage - One E Under Imple 1.1.3.1.3 / Civil works-Kinder IBRD / 89020 and improving of the quality Post Open - National 0.00 2023-06-16 2023-08-11 2024-02-07 tions nvelope mentation garten in Kocani- installation of preschool services of facade bricks MK-MLSP-377795-GO-RFQ-3. 3. Project Management, M Request for Quota Single Stage - One E 1.47 / Air conditioner for MLS IBRD / 89020 Post Open - National 0.00 Signed 2023-08-25 2023-10-20 2023-09-29 2023-11-19 onitoring and Evaluation tions nvelope P/PMU offices MK-MLSP-396350-GO-RFB-1. 1. Promoting social inclusi 3.28 / Hardware equipment ( on through improved access Single Stage - One E computers, printers and othe IBRD / 89020 Post Request for Bids Open - National 0.00 Signed 2023-12-10 2023-12-11 2023-12-15 2024-01-26 2024-01-03 2024-02-25 2024-01-05 2024-03-31 2024-01-25 2024-06-30 to social benefits and servic nvelope r hardware equipment) for t es he MLSP, SWC and other soci al institutions MK-MLSP-398581-GO-RFQ-1. 1. Promoting social inclusi Request for Quota Single Stage - One E Pending Impl 3.31 / Procurement of equip IBRD / 89020 on through improved access Post Open - National 0.00 2024-03-06 2024-05-01 2024-06-30 tions nvelope ementation ment for institution 25 May to social benefits and servic es MK-MLSP-398590-GO-RFQ-1. 1. Promoting social inclusi 3.34 / Softwаrе for archive w on through improved access Request for Quota Single Stage - One E Pending Impl IBRD / 89020 Post Open - National 0.00 2024-01-21 2024-03-17 2024-04-30 ork for SWC (Document ma to social benefits and servic tions nvelope ementation nagement system) es MK-MLSP-398592-GO-DIR-1. 1. Promoting social inclusi 3.35 / Web services develop IBRD / 89020 on through improved access Post Direct Selection Direct - National 0.00 Completed 2023-12-19 2024-01-10 2023-12-24 2023-08-31 2024-01-28 2024-02-05 2024-02-28 2024-11-06 ment (Public revenue office) to social benefits and servic es MK-MLSP-398594-GO-RFQ-1. 1. Promoting social inclusi 3.36 / Web services develop IBRD / 89020 on through improved access Post Direct Selection Direct - National 0.00 Completed 2023-12-18 2024-01-10 2023-12-23 2023-04-07 2024-01-27 2024-01-18 2024-02-28 2024-11-19 ment (Supreme Court) to social benefits and servic es MK-MLSP-403208-GO-RFQ-2. 1.16 / Procurement of equip 2. Expanding the access to Request for Quota Single Stage - One E Pending Impl ment for the renovated and IBRD / 89020 and improving of the quality Post Open - National 0.00 2024-06-07 2024-08-02 2025-01-29 tions nvelope ementation refurbishmed school/municip of preschool services al premises for ECEC spaces MK-MLSP-403211-GO-RFB-2. 1.17 / Procurement of equip 2. Expanding the access to Single Stage - One E Pending Impl ment for the kindergartens a IBRD / 89020 and improving of the quality Post Request for Bids Open - National 0.00 2024-02-04 2024-02-09 2024-03-22 2024-04-21 2024-05-26 2024-11-22 nvelope ementation pproved for financing throug of preschool services h MLSP public call-Aerodrom, Probistip, Ilinden and Centar MK-MLSP-403212-GO-RFQ-2. 1.18 / Procurement of equip 2. Expanding the access to Request for Quota Single Stage - One E ment for the kindergartens a IBRD / 89020 and improving of the quality Post Open - National 0.00 Canceled 2024-02-17 2024-04-13 2024-10-10 tions nvelope pproved for financing throug of preschool services h MLSP public call-Kavadarci and Caska MK-MLSP-446767-GO-RFQ-3. 3. Project Management, M Request for Quota Single Stage - One E Pending Impl 1.50 / Air conditioners for MS IBRD / 89020 Post Open - National 0.00 2024-08-28 2024-10-23 2024-11-22 onitoring and Evaluation tions nvelope ementation PDY/PMU offices MK-MLSP-458026-GO-RFQ-2. 1.18 / Procurement of equip 2. Expanding the access to Request for Quota Single Stage - One E Pending Impl ment for the kindergardens IBRD / 89020 and improving of the quality Post Open - National 0.00 2024-11-01 2024-12-27 2025-02-25 tions nvelope ementation approved for financing throu of preschool services gh MLSP public call- Caska Page 4 MK-MLSP-467105-GO-RFB-1. 1. Promoting social inclusi Single Stage - One E Pending Impl 3.38 / Procurement of hardw IBRD / 89020 on through improved access Post Request for Bids Open - National 0.00 2024-12-27 2025-01-01 2025-02-12 2025-03-14 2025-04-18 2025-06-30 nvelope ementation are equipment for the SWCs to social benefits and servic and the MSPDY es NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 1. Promoting social inclusi MK-MLSP-398583-NC-RFQ-1. Request for Quota Single Stage - One E IBRD / 89020 on through improved access Post Open - National 0.00 Signed 2023-12-22 2024-01-28 2024-01-24 2024-04-30 3.32 / Data entry in the SWIS tions nvelope to social benefits and servic es MK-MLSP-467100-NC-RFQ-2. 2. Expanding the access to Request for Quota Single Stage - One E Pending Impl 1.19 / Safeguarding of Bitola IBRD / 89020 and improving of the quality Post Open - National 0.00 2024-12-27 2025-02-21 2025-06-30 tions nvelope ementation kindergarten of preschool services CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MK-MLSP-72163-CS-CQS-112 1. Promoting social inclusi Consultant Qualifi / Technical assistance for acti / on through improved access Post Open - National 0.00 Canceled 2019-02-15 2019-02-23 2019-03-20 2019-03-27 2019-04-04 2020-04-03 cation Selection vation of GMI beneficiaries to social benefits and servic es MK-MLSP-72166-CS-CQS-122 1. Promoting social inclusi / Technical assistance for legi on through improved access Consultant Qualifi / Post Open - National 0.00 Canceled 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2020-04-17 slative changes regarding th to social benefits and servic cation Selection e implementation of reforme es d licensing system MK-MLSP-72168-CS-CQS-123 1. Promoting social inclusi Consultant Qualifi / Social service needs assess / on through improved access Post Open - National 0.00 Canceled 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2020-04-17 cation Selection ment to social benefits and servic es MK-MLSP-72170-CS-CQS-124 1. Promoting social inclusi / Developing system for finan on through improved access Consultant Qualifi / Post Open - National 0.00 Canceled 2019-05-01 2019-05-09 2019-06-03 2019-06-10 2019-06-18 2020-06-17 cing of social services includi to social benefits and servic cation Selection ng determination of cost of s es ervices, MK-MLSP-72172-CS-CQS-127 / Transformation of the large 1. Promoting social inclusi institutional capacities into s on through improved access Consultant Qualifi mall group homes, living with / Post Open - National 0.00 Canceled 2019-01-15 2019-01-23 2019-02-17 2019-02-24 2019-03-04 2020-03-03 to social benefits and servic cation Selection support, deinstitutionalizatio es n through foster families and other appropriate forms of pr otection MK-MLSP-72175-CS-CQS-128 1. Promoting social inclusi Quality And Cost- / Outreach activities includei / on through improved access Prior Open - National 0.00 Canceled 2019-03-01 2019-03-15 2019-04-26 2019-05-01 2019-05-09 2019-05-22 2019-05-30 2020-05-29 Based Selection ng Citizen Angegement activi to social benefits and servic ties es MK-MLSP-72676-CS-CQS-222 2. Expanding the access to Consultant Qualifi / Developing a new capitatio / and improving of the quality Post Open - National 0.00 Canceled 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2020-04-17 cation Selection n formula of preschool services MK-MLSP-77086-CS-LCS-311 3. Project Management, M Least Cost Selecti IBRD / 89020 Prior Open - National 80,713.34 Signed 2019-01-01 2020-02-26 2019-01-15 2019-02-26 2020-03-23 2019-03-03 2020-05-05 2019-03-11 2020-06-05 2019-03-24 2020-06-18 2019-04-01 2020-07-17 2024-03-30 7 / Project Audit onitoring and Evaluation on MK-MLSP-77089-CS-CQS-321 / Operational and Performanc 3. Project Management, M Consultant Qualifi e Audit of the implementatio / Post Open - National 78,345.50 Signed 2019-02-01 2020-02-18 2019-02-09 2019-03-06 2020-04-23 2019-03-13 2020-06-03 2019-03-21 2020-06-09 2024-02-17 onitoring and Evaluation cation Selection n of the ECDE Grant program for infrastructure projects MK-MLSP-77090-CS-CQS-322 / Operational and Performanc e Audit for the implementatio 3. Project Management, M Consultant Qualifi / Post Open - National 78,536.61 Signed 2019-02-01 2020-02-18 2019-02-09 2019-03-06 2020-04-23 2019-03-13 2020-06-03 2019-03-21 2020-06-09 2024-02-17 n of the grant mechanism th onitoring and Evaluation cation Selection at will promote development of (non-institutional) social se rvices at local level MK-MLSP-77091-CS-CQS-323 / Baseline and Follow up Insti 3. Project Management, M Consultant Qualifi / Post Open - National 158,863.24 Signed 2019-02-01 2019-10-10 2019-02-09 2019-03-06 2019-12-06 2019-03-13 2019-12-25 2019-03-21 2020-01-07 2024-02-17 tutional Assessment of the pr onitoring and Evaluation cation Selection eschool quality process MK-MLSP-72681-CS-QCBS-2 2. Expanding the access to 25 / Developing a system for Quality And Cost- Open - Internationa IBRD / 89020 and improving of the quality Post 0.00 Canceled 2019-01-01 2019-01-09 2019-02-15 2019-02-20 2019-02-25 2019-03-07 2019-03-15 2020-03-14 evaluation of quality in the pr Based Selection l of preschool services eschool education system MK-MLSP-72232-CS-QCBS-2 2. Expanding the access to Quality And Cost- Open - Internationa 21 / Developing of age appro IBRD / 89020 and improving of the quality Post 0.00 Canceled 2019-04-01 2019-04-09 2019-05-16 2019-05-21 2019-05-26 2019-06-05 2019-06-13 2020-06-12 Based Selection l priate teaching-learning mat of preschool services erials MK-MLSP-72229-CS-QCBS-2 2. Expanding the access to Quality And Cost- Open - Internationa 12 / Project designs for kinde IBRD / 89020 and improving of the quality Prior 0.00 Canceled 2019-01-01 2019-01-15 2019-02-26 2019-03-03 2019-03-11 2019-03-24 2019-04-01 2023-12-31 Based Selection l rgartens of preschool services MK-MLSP-72682-CS-QCBS-2 26 / Training of ECED admini 2. Expanding the access to Quality And Cost- Open - Internationa strators and other decision m IBRD / 89020 and improving of the quality Post 0.00 Canceled 2019-01-15 2019-01-23 2019-03-01 2019-03-06 2019-03-11 2019-03-21 2019-03-29 2020-03-28 Based Selection l akers to improve capacity an of preschool services d development of monitoring programs and tools MK-MLSP-76978-CS-QCBS-2 2. Expanding the access to Quality And Cost- Open - Internationa 27 / Outreach activities inclu IBRD / 89020 and improving of the quality Post 0.00 Canceled 2019-01-01 2019-01-09 2019-02-15 2019-02-20 2019-02-25 2019-03-07 2019-03-15 2020-03-14 Based Selection l ding Citizen Engagement acti of preschool services vities MK-MLSP-71874-CS-CQS-111 1. Promoting social inclusi / Technical assistance for legi on through improved access Consultant Qualifi / Prior Open - National 0.00 Canceled 2019-01-15 2019-01-29 2019-02-28 2019-03-10 2019-03-18 2020-03-17 slative changes regarding th to social benefits and servic cation Selection e implementation of GMI es MK-MLSP-72164-CS-CQS-121 1. Promoting social inclusi / Technical assistance for legi on through improved access Consultant Qualifi / Post Open - National 0.00 Canceled 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2020-04-17 slative changes regarding th to social benefits and servic cation Selection e implementation of social s es ervices reform Page 5 MK-MLSP-72171-CS-CQS-125 1. Promoting social inclusi / Development of quality sta on through improved access Consultant Qualifi ndards including licensing an / Post Open - National 0.00 Canceled 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2020-04-17 to social benefits and servic cation Selection d accreditation and system f es or monitoring for their achiev ement MK-MLSP-95692-CS-CQS-327 3. Project Management, M Consultant Qualifi / Outreach activities includin IBRD / 89020 Post Open - National 0.00 Canceled 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2021-04-17 onitoring and Evaluation cation Selection g Citizen Engagement activiti es MK-MLSP-98479-CS-CQS-327 3. Project Management, M Consultant Qualifi / Outreach activities includin IBRD / 89020 Post Open - National 0.00 Canceled 2019-03-01 2019-03-09 2019-04-03 2019-04-10 2019-04-18 2021-04-17 onitoring and Evaluation cation Selection g Citizen Engagement activiti es MK-MLSP-99426-CS-CQS-114 1. Promoting social inclusi Consultant Qualifi / Counselling and Motivation IBRD / 89020 on through improved access Prior Open - National 0.00 Canceled 2019-02-07 2019-02-07 2019-02-28 2019-04-13 2019-05-13 2019-06-17 2020-06-16 cation Selection for activation of GMA benefici to social benefits and servic aries es MK-MLSP-115906-CS-CQS-12 1. Promoting social inclusi Consultant Qualifi 13 / Social service needs ass IBRD / 89020 on through improved access Post Open - National 61,155.24 Signed 2019-06-03 2019-06-11 2019-06-11 2019-07-06 2019-07-11 2019-07-13 2019-07-25 2019-07-21 2019-08-09 2020-01-17 cation Selection essment to social benefits and servic es MK-MLSP-115916-CS-CQS-32 3. Project Management, M Consultant Qualifi 4 / Public campaign including IBRD / 89020 Post Open - National 0.00 Canceled 2019-06-03 2019-06-11 2019-07-06 2019-07-13 2019-07-21 2023-12-31 onitoring and Evaluation cation Selection Citizen Engagement activitie s MK-MLSP-119370-CS-QCBS- 3. Project Management, M Quality And Cost- 325 / Public campaign includi IBRD / 89020 Prior Open - National 415,933.50 Signed 2019-06-17 2019-07-15 2019-07-01 2019-07-16 2019-08-12 2019-11-12 2019-08-17 2019-12-03 2019-08-25 2019-12-06 2019-09-09 2020-02-21 2019-09-22 2020-03-14 2024-06-30 onitoring and Evaluation Based Selection ng Citizen Engagement activi ties MK-MLSP-122574-CS-CQS-21 2. Expanding the access to 21 / Project designs for new k Consultant Qualifi IBRD / 89020 and improving of the quality Prior Open - National 93,887.86 Signed 2019-07-15 2019-07-26 2019-07-29 2019-08-23 2020-02-05 2019-09-07 2020-04-07 2019-09-15 2019-11-24 2020-01-13 indergartens in Arachinovo, cation Selection of preschool services Bitola, Lipkovo and Valandov o MK-MLSP-122578-CS-CQS-21 23 / Revision of basic Project 2. Expanding the access to Consultant Qualifi designs for kindergartens in IBRD / 89020 and improving of the quality Post Open - National 12,335.25 Signed 2019-08-01 2019-08-07 2019-08-15 2019-09-14 2019-12-23 2019-09-24 2020-01-02 2019-10-05 2020-01-24 2020-04-02 cation Selection Arachinovo, Bitola, Lipkovo, of preschool services Valandovo ,Probishtip, Gostiv ar, Karposh 1 and Karposh 2 MK-MLSP-122576-CS-CQS-21 2. Expanding the access to 22 / Project designs for upgra Consultant Qualifi IBRD / 89020 and improving of the quality Post Open - National 74,081.25 Signed 2019-07-30 2019-08-01 2019-08-13 2019-09-12 2019-10-10 2019-09-22 2019-10-30 2019-10-06 2019-11-28 2020-01-04 des of kindergartens in Probi cation Selection of preschool services shtip, Gostivar, Karposh 1 an d Karposh 2 MK-MLSP-129132-CS-CQS-21 2. Expanding the access to 3 / Supervision of works for c Consultant Qualifi IBRD / 89020 and improving of the quality Post Open - National 31,454.12 Signed 2019-09-09 2019-09-24 2019-09-17 2019-10-12 2019-12-05 2019-10-19 2019-12-25 2019-10-27 2020-01-12 2021-03-10 onstruction of kindergartens i cation Selection of preschool services n Negotino and Kavadarci MK-MLSP-129133-CS-CQS-21 2. Expanding the access to 4 / Supervision of works for c Consultant Qualifi IBRD / 89020 and improving of the quality Post Open - National 25,130.45 Signed 2019-09-09 2019-11-12 2019-09-17 2019-10-12 2019-12-06 2019-10-19 2019-12-27 2019-10-27 2020-01-16 2019-12-16 onstruction of kindergartens i cation Selection of preschool services n Kocani and Kisela Voda MK-MLSP-129135-CS-CQS-21 2. Expanding the access to 5 / Project for interior design Consultant Qualifi IBRD / 89020 and improving of the quality Post Open - National 39,061.04 Signed 2019-09-09 2020-01-24 2019-09-17 2019-10-12 2020-02-25 2019-10-19 2020-03-16 2019-10-27 2020-04-07 2020-01-25 for Kindergardens in Kocani, cation Selection of preschool services Negotino, Kisela Voda, Kavad arci and Bogovinje MK-MLSP-129136-CS-CQS-21 2. Expanding the access to 6 / Project for interior design Consultant Qualifi IBRD / 89020 and improving of the quality Post Open - National 41,802.26 Signed 2019-09-09 2020-01-24 2019-09-17 2019-10-12 2020-02-27 2019-10-19 2020-03-16 2019-10-27 2020-03-31 2020-01-25 for Kindergartens in Gjorce P cation Selection of preschool services etrov, Resen, Kriva Palanka a nd Strumica MK-MLSP-135022-CS-CQS-12 14 / Company for providing s 1. Promoting social inclusi upport to the municipalities/ on through improved access Consultant Qualifi IBRD / 89020 Post Open - National 127,667.71 Signed 2019-09-20 2019-09-27 2019-10-04 2019-10-14 2019-12-02 2019-10-17 2019-12-25 2019-10-23 2020-01-03 2023-07-04 potential service providers in to social benefits and servic cation Selection preparation of application do es cuments including the projec t proposals MK-MLSP-146042-CS-CQS-2. 1.7 / Supervision of works for 2. Expanding the access to Consultant Qualifi construction of kindergartens IBRD / 89020 and improving of the quality Post Open - National 66,840.50 Signed 2019-11-20 2019-11-19 2019-11-28 2019-12-23 2019-12-23 2019-12-30 2019-12-27 2020-02-03 2020-01-07 2021-10-25 cation Selection in the municipalities of Strum of preschool services ica, Resen, Gjorce Petrov, Bo govinje and Kriva Palanka MK-MLSP-147511-CS-CQS-2. 2.16 / Consultants' firm deliv 2. Expanding the access to Consultant Qualifi ering services for supporting IBRD / 89020 and improving of the quality Post Open - National 99,693.98 Signed 2019-11-29 2019-12-13 2019-12-13 2020-01-01 2019-12-20 2020-01-06 2020-02-21 2020-02-01 2020-03-11 2021-01-31 cation Selection the process of improving the of preschool services quality of preschool system MK-MLSP-201117-CS-CQS-2. 2. Expanding the access to 1.8 / Supervision of works for Consultant Qualifi IBRD / 89020 and improving of the quality Post Open - National 41,315.97 Signed 2020-12-01 2020-10-27 2020-12-22 2021-02-04 2021-02-03 2021-03-06 2021-02-24 2021-04-10 2021-03-26 2023-03-31 construction of kindergartens cation Selection of preschool services in Probishtip, Lipkovo, Bitola and Valandovo MK-MLSP-201118-CS-CQS-2. 2. Expanding the access to 1.9 / Supervision of works for Consultant Qualifi IBRD / 89020 and improving of the quality Post Open - National 19,966.90 Signed 2020-12-01 2020-10-27 2020-12-22 2021-02-04 2021-03-26 2021-03-06 2021-05-25 2021-04-10 2021-05-28 2023-03-31 construction of kindergartens cation Selection of preschool services in Gostivar, Arachinovo and K arposh MK-MLSP-201119-CS-CQS-2. 2. Expanding the access to 1.10 / Project for interior desi Consultant Qualifi IBRD / 89020 and improving of the quality Post Open - National 24,744.21 Signed 2020-12-01 2020-10-27 2020-12-22 2021-02-04 2021-04-14 2021-03-06 2021-05-18 2021-04-10 2021-06-10 2023-03-31 gn for Kindergartens in Lipko cation Selection of preschool services vo, Aracinovo and Valandovo MK-MLSP-201120-CS-CQS-2. 2. Expanding the access to 1.11 / Project for interior desi Consultant Qualifi IBRD / 89020 and improving of the quality Post Open - National 14,214.43 Signed 2020-12-01 2020-10-30 2020-12-22 2021-02-04 2021-06-15 2021-03-06 2021-07-28 2021-04-10 2021-08-09 2023-03-31 gn for Kindergartens in Probi cation Selection of preschool services shtip, Bitola, Gostivar and Ka rposh MK-MLSP-245170-CS-CQS-2. 2.21 / International Consulta 2. Expanding the access to Consultant Qualifi Open - Internationa ncy' Company for Designing , IBRD / 89020 and improving of the quality Post 0.00 Canceled 2021-08-01 2021-08-22 2021-10-05 2021-11-04 2021-12-09 2022-06-30 cation Selection l Implementing and Organizin of preschool services g Teacher’s Training Program Page 6 MK-MLSP-266962-CS-CQS-2. 2. Expanding the access to 1.12 / Project for interior desi Consultant Qualifi IBRD / 89020 and improving of the quality Post Open - National 13,378.29 Signed 2021-12-19 2021-12-21 2022-01-09 2022-02-22 2022-02-21 2022-03-24 2022-03-14 2022-04-28 2022-04-01 2023-04-28 gn for Kindergardens in , Bito cation Selection of preschool services la, Gostivar and Karposh 3 MK-MLSP-267024-CS-QCBS- 2.2.22 / International Consult 2. Expanding the access to Quality And Cost- Open - Internationa ancy' Company for Designing IBRD / 89020 and improving of the quality Post 0.00 Terminated 2021-12-19 2021-12-22 2022-01-09 2022-02-21 2022-02-22 2022-04-11 2022-03-22 2022-05-12 2022-04-21 2022-06-06 2022-05-26 2022-06-26 2022-06-30 2022-12-22 2023-06-30 Based Selection l , Implementing and Organizi of preschool services ng Teacher’s Training Progra m MK-MLSP-294626-CS-CQS-2. 2. Expanding the access to 2.23 / Consultant’s Company Consultant Qualifi IBRD / 89020 and improving of the quality Post Open - National 0.00 Signed 2022-05-15 2022-05-12 2022-06-05 2022-07-19 2022-08-22 2022-08-18 2022-09-16 2022-09-22 2022-11-11 2023-03-21 for Development of Early Chil cation Selection of preschool services dhood Education and Care Fu nding Formula MK-MLSP-370356-CS-CQS-1. 1. Promoting social inclusi 2.20 / Consultant’s Company on through improved access Consultant Qualifi for Development of Funding IBRD / 89020 Post Open - National 0.00 Signed 2023-07-06 2023-07-07 2023-07-27 2023-09-09 2023-09-29 2023-10-09 2023-11-07 2023-11-13 2023-11-23 2024-04-11 to social benefits and servic cation Selection Formula for block grants for i es nstitutional accommodation and care for the elderly MK-MLSP-396348-CS-CQS-1. 1. Promoting social inclusi Consultant Qualifi Pending Impleme 2.21 / Methodology for Cost- IBRD / 89020 on through improved access Post Open - National 0.00 2023-12-07 2023-12-28 2024-02-10 2024-03-11 2024-04-15 2024-06-30 cation Selection ntation Sharing of the Social Service to social benefits and servic “In Home Care” es MK-MLSP-398573-CS-CQS-1. 1. Promoting social inclusi Consultant Qualifi Pending Impleme 3.29 / Supervision company f IBRD / 89020 on through improved access Post Open - National 0.00 2023-12-17 2024-01-07 2024-02-20 2024-03-21 2024-04-25 2024-06-30 cation Selection ntation or renovation of the institutio to social benefits and servic n 25 May es MK-MLSP-403197-CS-CQS-1. 1. Promoting social inclusi Consultant Qualifi Under Implement 2.22 / Social Mentoring for La IBRD / 89020 on through improved access Post Open - National 0.00 2024-01-17 2024-03-05 2024-02-07 2024-03-22 2024-04-21 2024-05-26 2025-06-30 cation Selection ation bour Market Activation of GM to social benefits and servic A beneficiaries es MK-MLSP-403198-CS-CQS-2. 1.13 / Preparation of Project 2. Expanding the access to Consultant Qualifi Designs and Supervision for IBRD / 89020 and improving of the quality Post Open - National 0.00 Canceled 2024-02-01 2024-02-22 2024-04-06 2024-05-06 2024-06-10 2025-06-30 cation Selection Renovation and refurbishme of preschool services nt of school/municipal premi ses for ECEC spaces MK-MLSP-403202-CS-CQS-2. 1.14 / Revision of basic Proje 2. Expanding the access to Consultant Qualifi ct designs for Renovation an IBRD / 89020 and improving of the quality Post Open - National 0.00 Canceled 2024-02-11 2024-03-03 2024-04-16 2024-05-16 2024-06-20 2024-12-17 cation Selection d refurbishment of school/mu of preschool services nicipal premises for ECEC sp aces MK-MLSP-403304-CS-CQS-2. 2. Expanding the access to Consultant Qualifi 2.27 / Company for Logistical IBRD / 89020 and improving of the quality Post Open - National 0.00 Canceled 2024-02-11 2024-03-03 2024-04-16 2024-05-16 2024-06-20 2025-06-30 cation Selection Support for Training of Presc of preschool services hol Staff MK-MLSP-467081-CS-CQS-1. 1. Promoting social inclusi Consultant Qualifi Pending Impleme 3.38 / Preparation of Basic Pr IBRD / 89020 on through improved access Post Open - National 0.00 2024-12-20 2025-01-10 2025-02-23 2025-03-25 2025-04-29 2025-06-30 cation Selection ntation oject Design for renovation o to social benefits and servic f the MSPDY es MK-MLSP-467082-CS-CQS-1. 1. Promoting social inclusi Consultant Qualifi Pending Impleme 3.39 / Revision of Basic Proje IBRD / 89020 on through improved access Post Open - National 0.00 2024-12-20 2025-01-10 2025-02-23 2025-03-25 2025-04-29 2025-06-30 cation Selection ntation ct Design for renovation of th to social benefits and servic e MSPDY es MK-MLSP-467102-CS-CQS-2. 1.13 / I. Preparation of Projec t Designs for: a)Renovation/ Reconstruction/Adaptation of 2. Expanding the access to Consultant Qualifi Pending Impleme school/municipal premises in IBRD / 89020 and improving of the quality Post Open - National 0.00 2024-12-22 2025-01-12 2025-02-25 2025-03-27 2025-05-01 2025-06-30 cation Selection ntation to ECEC spaces and b) for re of preschool services novation of the MSPDY and II. Supervision Works for: a) E CEC spaces and b) roof cons tructionin Kocani MK-MLSP-467103-CS-CQS-2. 1.14 / Revision of Basic Proje 2. Expanding the access to ct designs for: a) Renovation/ Consultant Qualifi Pending Impleme IBRD / 89020 and improving of the quality Post Open - National 0.00 2024-12-22 2025-01-12 2025-02-25 2025-03-27 2025-05-01 2025-06-30 Reconstruction/Adaptation of cation Selection ntation of preschool services school/municipal premises in to ECEC spaces and b) for re novation of the MSPDY INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MK-MLSP-72221-CS-CDS-135 1. Promoting social inclusi / Actuary in the Unit for Anal IBRD / 89020 on through improved access Prior Direct Selection Direct 79,664.25 Completed 2019-01-01 2018-11-12 2019-01-21 2018-10-01 2019-02-08 2018-10-08 2024-02-07 2021-02-07 ysis, Evaluation and Monitori to social benefits and servic ng es MK-MLSP-72223-CS-CDS-136 1. Promoting social inclusi Individual Consult / IT in the Unit for Analysis, E IBRD / 89020 on through improved access Prior Open 65,337.88 Completed 2019-01-01 2018-10-25 2019-01-29 2018-11-23 2019-02-08 2018-11-28 2019-02-16 2018-12-07 2024-02-15 2021-05-12 ant Selection valuation and Monitoring to social benefits and servic es MK-MLSP-72225-CS-CDS-137 1. Promoting social inclusi / Researcher in the Unit for A IBRD / 89020 on through improved access Prior Direct Selection Direct 75,392.24 Signed 2019-01-01 2018-11-12 2019-01-21 2018-10-01 2019-02-08 2018-10-08 2024-02-07 nalysis, Evaluation and Monit to social benefits and servic oring es MK-MLSP-72228-CS-CDS-139 1. Promoting social inclusi / Legal Advisor in the Unit for IBRD / 89020 on through improved access Prior Direct Selection Direct 197,332.13 Completed 2019-01-01 2018-11-12 2019-01-21 2018-10-01 2019-02-08 2018-10-08 2024-02-07 2021-02-08 Analysis, Evaluation and Mon to social benefits and servic itoring es MK-MLSP-76981-CS-INDV-22 8 / Capacity building of local 2. Expanding the access to Individual Consult architects and engineers for IBRD / 89020 and improving of the quality Post Open 84,037.50 Signed 2019-03-01 2019-02-04 2019-03-24 2019-03-29 2019-03-31 2019-05-10 2019-04-08 2019-05-25 2019-10-05 ant Selection such innovative and highly e of preschool services nergy-efficient infrastructure MK-MLSP-77005-CS-CDS-311 3. Project Management, M IBRD / 89020 Prior Direct Selection Direct 225,455.94 Signed 2019-01-01 2018-11-12 2019-01-21 2018-10-01 2019-02-08 2018-10-18 2024-02-07 / Project Manager onitoring and Evaluation MK-MLSP-77006-CS-CDS-312 3. Project Management, M IBRD / 89020 Prior Direct Selection Direct 189,073.72 Signed 2019-01-01 2018-11-12 2019-01-21 2019-02-08 2018-10-17 2024-02-07 / Procurement manager onitoring and Evaluation MK-MLSP-77007-CS-INDV-31 3. Project Management, M Individual Consult / Prior Open 0.00 Canceled 2019-01-01 2019-01-29 2019-02-08 2019-02-16 2024-02-13 3 / Coordinator for ECDE onitoring and Evaluation ant Selection Page 7 MK-MLSP-77008-CS-INDV-31 3. Project Management, M Individual Consult 4 / Coordinator for Social ser IBRD / 89020 Prior Open 177,444.70 Signed 2019-01-01 2019-05-15 2019-01-29 2019-05-31 2019-02-08 2019-06-03 2019-02-16 2019-06-15 2024-02-15 onitoring and Evaluation ant Selection vices development MK-MLSP-77009-CS-INDV-31 3. Project Management, M IBRD / 89020 Prior Direct Selection Direct 175,079.26 Completed 2019-01-01 2018-11-12 2019-01-21 2018-10-01 2019-02-08 2018-10-17 2024-02-07 2021-08-20 5 / IT manager onitoring and Evaluation MK-MLSP-77010-CS-CDS-316 3. Project Management, M IBRD / 89020 Prior Direct Selection Direct 177,497.86 Signed 2019-01-01 2018-11-12 2019-01-21 2019-02-08 2018-10-17 2024-02-07 / Financial manager onitoring and Evaluation MK-MLSP-77016-CS-INDV-31 3. Project Management, M Individual Consult 11 / Environmental/social saf IBRD / 89020 Prior Open 79,853.27 Signed 2019-01-01 2019-01-24 2019-01-29 2019-03-18 2019-02-08 2019-03-26 2019-02-16 2019-04-08 2024-02-15 onitoring and Evaluation ant Selection eguards specialist MK-MLSP-72227-CS-CDS-138 1. Promoting social inclusi / Social Consultant in the Uni IBRD / 89020 on through improved access Prior Direct Selection Direct 132,358.19 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-19 2024-06-30 t for Analysis, Evaluation and to social benefits and servic Monitoring es MK-MLSP-77011-CS-CDS-317 3. Project Management, M IBRD / 89020 Prior Direct Selection Direct 53,314.64 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-17 2024-06-30 / Civil engineer/architect onitoring and Evaluation MK-MLSP-77012-CS-CDS-318 3. Project Management, M IBRD / 89020 Prior Direct Selection Direct 67,944.00 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-17 2024-06-30 / Civil engineer/architect onitoring and Evaluation MK-MLSP-77013-CS-CDS-319 3. Project Management, M IBRD / 89020 Prior Direct Selection Direct 52,145.31 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-17 2024-06-30 / Civil engineer/architect onitoring and Evaluation MK-MLSP-77014-CS-CDS-311 3. Project Management, M IBRD / 89020 Prior Direct Selection Direct 155,023.10 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-17 2024-06-30 0 / Civil engineer/architect onitoring and Evaluation MK-MLSP-77022-CS-CDS-311 3. Project Management, M Individual Consult IBRD / 89020 Post Open 0.00 Canceled 2019-01-01 2019-01-29 2019-02-08 2019-02-16 2024-06-30 4 / Grant application officer onitoring and Evaluation ant Selection MK-MLSP-77083-CS-INDV-31 3. Project Management, M Individual Consult IBRD / 89020 Prior Open 150,188.17 Completed 2019-01-01 2019-11-19 2019-01-24 2019-12-07 2019-01-31 2019-12-10 2019-02-08 2019-12-27 2024-06-30 2020-01-16 15 / M&E Officer onitoring and Evaluation ant Selection MK-MLSP-77018-CS-CDS-311 3. Project Management, M IBRD / 89020 Prior Direct Selection Direct 178,697.43 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-17 2024-06-30 12 / Grant Administrative Co onitoring and Evaluation ordinator MK-MLSP-77020-CS-CDS-311 3. Project Management, M IBRD / 89020 Prior Direct Selection Direct 88,621.61 Signed 2018-10-24 2018-11-12 2018-11-08 2018-10-01 2018-11-23 2018-10-17 2024-06-30 3 / Financial and administrati onitoring and Evaluation ve officer MK-MLSP-77085-CS-CDS-311 3. Project Management, M Individual Consult IBRD / 89020 Post Open 38,258.72 Signed 2019-01-01 2022-02-21 2019-01-29 2022-03-18 2019-02-08 2022-03-21 2019-02-16 2022-04-06 2024-06-30 6 / IT officer onitoring and Evaluation ant Selection MK-MLSP-94587-CS-INDV-31 3. Project Management, M Individual Consult 20 / Environmental/social saf IBRD / 89020 Post Open 87,697.46 Signed 2019-03-01 2020-05-20 2019-03-24 2020-06-09 2019-03-31 2020-06-29 2019-04-08 2020-07-14 2024-04-06 onitoring and Evaluation ant Selection eguards assistance MK-MLSP-94589-CS-INDV-31 3. Project Management, M Individual Consult IBRD / 89020 Post Open 153,586.85 Terminated 2019-03-01 2019-02-07 2019-03-24 2019-04-12 2019-03-31 2019-04-15 2019-04-08 2019-05-02 2024-04-06 22 / Interior Designer onitoring and Evaluation ant Selection MK-MLSP-94590-CS-INDV-31 3. Project Management, M Individual Consult IBRD / 89020 Post Open 29,590.53 Signed 2019-02-01 2019-02-24 2019-03-18 2019-03-03 2019-04-01 2019-03-11 2019-04-20 2024-03-09 23 / Business Analyst onitoring and Evaluation ant Selection MK-MLSP-94593-CS-INDV-11 1. Promoting social inclusi Individual Consult 3 / Social Safety Net Speciali IBRD / 89020 on through improved access Post Open 96,631.92 Signed 2019-02-01 2019-02-04 2019-02-24 2019-03-29 2019-03-03 2019-04-09 2019-03-11 2019-05-30 2024-03-09 ant Selection st to social benefits and servic es MK-MLSP-94594-CS-INDV-12 1. Promoting social inclusi 9 / Development of norms an on through improved access Individual Consult d standards for establishing IBRD / 89020 Post Open 13,459.20 Signed 2019-03-01 2019-02-06 2019-03-24 2019-04-15 2019-03-31 2019-05-20 2019-04-08 2019-06-07 2020-04-07 to social benefits and servic ant Selection of social services and for ens es uring quality in the service d elivery MK-MLSP-94596-CS-INDV-12 1. Promoting social inclusi 10 / Support for Developmen on through improved access Individual Consult t of norms and standards for IBRD / 89020 Post Open 8,335.63 Signed 2019-03-01 2019-02-06 2019-03-24 2019-04-15 2019-03-31 2019-05-22 2019-04-08 2019-06-12 2020-04-07 to social benefits and servic ant Selection establishing of social service es s and for ensuring quality in t he service delivery MK-MLSP-94598-CS-INDV-12 1. Promoting social inclusi 11 / Developing a system for on through improved access Individual Consult IBRD / 89020 Post Open 0.00 Canceled 2019-03-01 2019-03-24 2019-03-31 2019-04-08 2020-04-07 evaluation of quality in the s to social benefits and servic ant Selection ocial services delivery syste es m MK-MLSP-95684-CS-INDV-12 1. Promoting social inclusi 12 / Preparation of Cost Meth on through improved access Individual Consult IBRD / 89020 Post Open 22,275.54 Signed 2019-02-01 2019-02-06 2019-02-24 2019-04-17 2019-03-03 2019-05-27 2019-03-11 2019-06-11 2019-09-07 odology for Establishing of S to social benefits and servic ant Selection ocial Services including pricin es g list MK-MLSP-95686-CS-INDV-22 2. Expanding the access to Individual Consult 9 / Developing a new capitati IBRD / 89020 and improving of the quality Post Open 7,761.25 Signed 2019-05-01 2019-10-18 2019-05-24 2019-12-04 2019-05-31 2019-12-17 2019-06-08 2020-01-03 2019-12-05 ant Selection on formula of preschool services MK-MLSP-96725-CS-INDV-31 3. Project Management, M Individual Consult IBRD / 89020 Post Direct 0.00 Canceled 2019-02-01 2019-01-30 2019-02-14 2019-04-01 2019-02-24 2019-03-04 2024-03-02 24 / Business Analyst Assista onitoring and Evaluation ant Selection nt MK-MLSP-97638-CS-CDS-114 1. Promoting social inclusi / Counselling and Motivation IBRD / 89020 on through improved access Prior Direct Selection Direct 0.00 Canceled 2019-02-01 2019-02-11 2019-04-17 2020-04-16 for activation of GMA benefici to social benefits and servic aries es MK-MLSP-119013-CS-INDV-3 3. Project Management, M Individual Consult IBRD / 89020 Post Limited 102,630.85 Signed 2019-06-13 2019-01-30 2019-06-23 2019-04-01 2019-06-30 2019-04-04 2019-07-08 2019-04-18 2020-01-04 125 / Business Analyst Assist onitoring and Evaluation ant Selection ant MK-MLSP-129139-CS-INDV-3 3. Project Management, M Individual Consult IBRD / 89020 Post Open 117,305.19 Signed 2019-09-09 2019-12-03 2019-10-02 2019-12-28 2019-10-09 2019-12-30 2019-10-24 2020-01-13 2024-07-29 126 / Civil engineer onitoring and Evaluation ant Selection MK-MLSP-129140-CS-INDV-3 3. Project Management, M Individual Consult IBRD / 89020 Post Open 83,757.70 Signed 2019-09-09 2020-10-27 2019-10-02 2021-01-08 2019-10-09 2021-01-12 2019-10-24 2021-01-31 2024-07-29 127 / Civil engineer/arhitect onitoring and Evaluation ant Selection MK-MLSP-129143-CS-INDV-3 3. Project Management, M Individual Consult IBRD / 89020 Post Open 0.00 Canceled 2019-09-09 2019-10-02 2019-10-09 2019-10-24 2024-07-29 128 / Electrical engineer onitoring and Evaluation ant Selection MK-MLSP-129144-CS-INDV-3 3. Project Management, M Individual Consult IBRD / 89020 Post Open 0.00 Canceled 2019-09-09 2019-10-02 2019-10-09 2019-10-24 2024-07-29 129 / Mechanical engineer onitoring and Evaluation ant Selection Page 8 MK-MLSP-129624-CS-INDV-1 1. Promoting social inclusi Individual Consult 317 / Economist in the Unit f IBRD / 89020 on through improved access Post Limited 157,335.13 Signed 2019-08-29 2019-09-13 2019-09-06 2019-09-17 2019-09-11 2019-09-17 2019-10-10 2019-09-18 2024-08-14 ant Selection or Analysis, Evaluation and M to social benefits and servic onitoring es MK-MLSP-129625-CS-INDV-3 3. Project Management, M Individual Consult IBRD / 89020 Post Open 113,545.04 Signed 2019-09-18 2019-09-19 2019-10-11 2019-10-18 2019-10-26 2019-10-20 2019-11-03 2019-11-01 2020-05-01 130 / Procurement officer onitoring and Evaluation ant Selection 2. Expanding the access to MK-MLSP-135381-CS-INDV-1 Individual Consult IBRD / 89020 and improving of the quality Post Open 109,940.00 Signed 2019-10-01 2019-10-10 2019-10-24 2019-12-04 2019-10-26 2020-01-20 2019-11-12 2020-01-25 2024-06-18 .2.10 / Principal Investigator ant Selection of preschool services MK-MLSP-135385-CS-INDV-2 2. Expanding the access to Individual Consult 211 / Local Support to the Pri IBRD / 89020 and improving of the quality Post Open 70,345.79 Signed 2019-10-01 2019-10-10 2019-10-24 2019-12-11 2019-10-31 2019-12-14 2019-11-22 2019-12-22 2024-06-28 ant Selection ncipal Investigator of preschool services MK-MLSP-135386-CS-INDV-2 2. Expanding the access to .2.12 / National Coordinator f Individual Consult IBRD / 89020 and improving of the quality Post Open 55,651.68 Signed 2019-10-01 2019-10-10 2019-10-24 2019-12-03 2019-10-31 2019-12-14 2019-11-08 2019-12-22 2024-06-14 or Measuring Early Learning ant Selection of preschool services Environment (MELE) MK-MLSP-135387-CS-INDV-2 2. Expanding the access to .2.13 / National Coordinator f Individual Consult IBRD / 89020 and improving of the quality Post Open 55,651.68 Signed 2019-10-01 2019-10-10 2019-10-24 2019-12-03 2019-10-31 2019-12-14 2019-11-08 2019-12-22 2024-06-14 or Measurement of Develop ant Selection of preschool services ment and Early Learning (MO DEL) MK-MLSP-135389-CS-INDV-2 .2.14 / Local Consultant for st 2. Expanding the access to Individual Consult rengthening the preschool sy IBRD / 89020 and improving of the quality Post Open 55,651.68 Signed 2019-10-01 2019-10-10 2019-10-24 2019-12-03 2019-10-31 2019-12-14 2019-11-08 2019-12-26 2024-06-14 ant Selection stem for pre-service and in-s of preschool services ervice teacher training MK-MLSP-147510-CS-INDV-2 2. Expanding the access to Individual Consult .2.15 / International Teacher IBRD / 89020 and improving of the quality Post Open 52,793.46 Signed 2019-11-27 2019-12-10 2019-12-14 2019-12-13 2019-12-19 2020-02-21 2020-01-16 2020-03-11 2024-06-23 ant Selection Training and Program Design of preschool services Expert Consultant MK-MLSP-173423-CS-INDV-2 2. Expanding the access to Individual Consult .2.17 / Developing a new cap IBRD / 89020 and improving of the quality Post Open 38,250.00 Signed 2020-06-01 2020-08-18 2020-07-20 2021-01-22 2020-08-10 2021-02-18 2020-09-14 2021-03-17 2021-01-12 ant Selection itation formula of preschool services MK-MLSP-173424-CS-INDV-3 3. Project Management, M Individual Consult IBRD / 89020 Prior Limited 119,029.21 Signed 2020-05-15 2020-05-29 2020-05-20 2020-06-01 2020-06-10 2020-06-15 2020-07-15 2020-06-30 2024-06-30 .1.31 / System administrator onitoring and Evaluation ant Selection MK-MLSP-173426-CS-INDV-3 3. Project Management, M Individual Consult IBRD / 89020 Prior Limited 67,102.22 Signed 2020-05-15 2020-05-20 2020-05-20 2020-06-08 2020-06-10 2020-06-26 2020-07-15 2020-07-05 2024-06-30 .1.33 / Assistant Civil enginee onitoring and Evaluation ant Selection r MK-MLSP-201109-CS-INDV-1 1. Promoting social inclusi .3.18 / Researcher/Analyst in on through improved access Individual Consult IBRD / 89020 Post Open 0.00 Canceled 2020-11-18 2020-11-09 2021-01-06 2021-01-27 2021-03-03 2024-06-30 the Unit for Analysis, Evaluati to social benefits and servic ant Selection on and Monitoring es MK-MLSP-201121-CS-INDV-3 3. Project Management, M Individual Consult IBRD / 89020 Post Open 0.00 Canceled 2020-12-01 2021-01-19 2021-02-09 2021-03-16 2024-06-30 .1.34 / Interior Designer onitoring and Evaluation ant Selection MK-MLSP-201123-CS-INDV-3 3. Project Management, M Individual Consult IBRD / 89020 Prior Open 83,577.45 Signed 2020-12-01 2020-10-28 2021-01-19 2021-01-08 2021-02-09 2021-01-12 2021-03-16 2021-01-31 2024-06-30 .1.35 / Civil engineer/architec onitoring and Evaluation ant Selection t MK-MLSP-201124-CS-INDV-3 3. Project Management, M Individual Consult IBRD / 89020 Prior Open 61,306.83 Signed 2020-12-01 2020-11-09 2021-01-19 2020-12-29 2021-02-09 2021-01-11 2021-03-16 2021-01-18 2024-06-30 .1.36 / Assistant Coordinator onitoring and Evaluation ant Selection for ECDE MK-MLSP-201125-CS-INDV-3 3. Project Management, M Individual Consult .1.37 / Assistant Coordinator IBRD / 89020 Prior Open 76,755.50 Signed 2020-12-01 2020-11-09 2021-01-19 2020-12-22 2021-02-09 2020-12-30 2021-03-16 2021-01-05 2024-06-30 onitoring and Evaluation ant Selection for Social services developm ent MK-MLSP-201126-CS-INDV-3 3. Project Management, M Individual Consult IBRD / 89020 Prior Open 82,012.45 Signed 2020-12-01 2020-10-28 2021-01-19 2021-01-11 2021-02-09 2021-01-12 2021-03-16 2021-01-20 2024-06-30 .1.38 / Civil engineer/architec onitoring and Evaluation ant Selection t MK-MLSP-203846-CS-INDV-1 1. Promoting social inclusi Individual Consult .3.19 / Legal Advisor in the U IBRD / 89020 on through improved access Prior Open 79,187.98 Signed 2020-11-18 2020-11-16 2021-01-06 2021-03-08 2021-01-27 2021-04-21 2021-03-03 2021-05-10 2024-06-30 ant Selection nit for Analysis, Evaluation a to social benefits and servic nd Monitoring es MK-MLSP-203854-CS-INDV-3 3. Project Management, M Individual Consult .1.39 / Junior Assistant Coordi IBRD / 89020 Prior Open 76,034.50 Signed 2020-11-15 2020-11-16 2021-01-03 2020-12-22 2021-01-24 2020-12-31 2021-02-28 2021-01-17 2024-06-30 onitoring and Evaluation ant Selection nator for Social Services Dev elopment MK-MLSP-203861-CS-INDV-1 1. Promoting social inclusi Individual Consult .2.15 / Methodology for pricin IBRD / 89020 on through improved access Post Open 218.21 Signed 2020-11-15 2020-11-13 2021-01-03 2020-11-30 2021-01-24 2020-12-03 2021-02-28 2020-12-26 2021-04-29 ant Selection g social services to social benefits and servic es MK-MLSP-212355-CS-INDV-2 2. Expanding the access to Individual Consult .2.20 / Local Consultant for D IBRD / 89020 and improving of the quality Post Open 9,777.87 Signed 2021-01-07 2021-01-22 2021-02-25 2021-02-25 2021-03-18 2021-03-04 2021-04-22 2021-03-24 2022-04-22 ant Selection eveloping a new capitation fo of preschool services rmula MK-MLSP-219384-CS-INDV-3 3. Project Management, M Individual Consult IBRD / 89020 Prior Limited 72,538.72 Signed 2021-02-17 2021-02-17 2021-02-22 2021-02-22 2021-03-15 2021-03-02 2021-04-19 2021-03-09 2024-06-30 .1.40 / IT officer onitoring and Evaluation ant Selection MK-MLSP-232018-CS-INDV-1 1. Promoting social inclusi Individual Consult .2.16 / Methodology for Pricin IBRD / 89020 on through improved access Post Direct 13,130.98 Signed 2021-05-05 2021-07-09 2021-05-15 2021-07-14 2021-06-05 2021-07-25 2021-07-10 2021-08-01 2024-06-30 ant Selection g Social Services to social benefits and servic es MK-MLSP-244303-CS-INDV-1 1. Promoting social inclusi .3.20 / Disability and Inclusio on through improved access Individual Consult IBRD / 89020 Post Limited 69,015.98 Signed 2021-07-19 2021-07-21 2021-07-24 2021-07-28 2021-08-14 2021-07-29 2021-09-18 2021-08-13 2024-06-30 n Consultant  in the Unit for to social benefits and servic ant Selection Analysis, Evaluation and Mon es itoring MK-MLSP-245182-CS-CDS-1. 1. Promoting social inclusi 2.17 / Expert in financial allo on through improved access IBRD / 89020 Post Direct Selection Direct 3,676.96 Completed 2021-08-01 2021-08-13 2021-08-11 2021-08-17 2021-10-15 2021-12-15 2022-01-13 2022-03-15 wances for social protection to social benefits and servic national program developme es nt MK-MLSP-245185-CS-CDS-1. 1. Promoting social inclusi 2.18 / Expert in social service on through improved access IBRD / 89020 Post Direct Selection Direct 3,637.93 Completed 2021-08-01 2021-08-13 2021-08-11 2021-08-17 2021-10-15 2021-12-15 2022-01-13 2022-03-15 s for social protection nation to social benefits and servic al program development es MK-MLSP-245187-CS-CDS-1. 1. Promoting social inclusi 2.19 / Expert in social protect on through improved access IBRD / 89020 Post Direct Selection Direct 3,676.96 Completed 2021-08-01 2021-08-13 2021-08-11 2021-08-17 2021-10-15 2021-12-15 2022-01-13 2022-03-15 ion system for national progr to social benefits and servic am development es Page 9 MK-MLSP-269870-CS-INDV-3 3. Project Management, M Individual Consult IBRD / 89020 Post Open 56,642.40 Signed 2022-01-02 2021-12-23 2022-01-19 2021-12-31 2022-01-24 2022-01-03 2022-02-03 2022-01-27 2024-06-30 .1.42 / PMU Legal Advisor onitoring and Evaluation ant Selection MK-MLSP-278417-CS-INDV-1 1. Promoting social inclusi .3.21 / Disability and Inclusio on through improved access Individual Consult IBRD / 89020 Post Open 39,564.14 Terminated 2022-02-15 2022-02-15 2022-04-05 2022-03-03 2022-04-26 2022-03-08 2022-05-31 2022-03-14 2024-06-30 n Consultant  in the Unit for to social benefits and servic ant Selection Analysis, Evaluation and Mon es itoring MK-MLSP-278418-CS-INDV-1 1. Promoting social inclusi .3.22 / Social Protection Spec on through improved access Individual Consult IBRD / 89020 Post Open 71,550.08 Terminated 2022-02-15 2022-02-15 2022-04-05 2022-03-03 2022-04-26 2022-03-08 2022-05-31 2022-03-14 2024-06-30 ialist in the Unit for Analysis, to social benefits and servic ant Selection Evaluation and Monitoring es MK-MLSP-285014-CS-INDV-3 1. Promoting social inclusi Individual Consult .1.43 / Coordinator for Early IBRD / 89020 on through improved access Post Open 40,852.27 Terminated 2022-03-20 2022-03-17 2022-05-08 2022-04-20 2022-05-29 2022-05-04 2022-07-03 2022-05-16 2024-06-30 ant Selection Childhood Education and Car to social benefits and servic e es MK-MLSP-302862-CS-INDV-2 2. Expanding the access to Individual Consult .2.24 / International STATA a IBRD / 89020 and improving of the quality Post Open 0.00 Signed 2022-07-10 2022-07-15 2022-08-28 2022-10-17 2022-09-18 2022-11-09 2022-10-23 2022-11-25 2024-06-30 ant Selection nd Data Analysis Consultant of preschool services MK-MLSP-319376-CS-INDV-1 1. Promoting social inclusi Individual Consult .3.24 / Financial Expert in the IBRD / 89020 on through improved access Post Open - National 0.00 Signed 2022-10-04 2022-10-05 2022-11-22 2022-10-26 2022-12-13 2022-10-27 2023-01-17 2022-11-01 2024-06-30 ant Selection Unit for Analysis, Evaluation to social benefits and servic and Monitoring es MK-MLSP-321319-CS-CDS-3. 3. Project Management, M 1.45 / Monitoring and Evaluat IBRD / 89020 Post Direct Selection Direct - National 0.00 Signed 2022-10-16 2022-11-01 2022-10-26 2022-09-30 2022-12-30 2022-11-01 2024-06-30 onitoring and Evaluation ion Specialist MK-MLSP-363178-CS-INDV-3 3. Project Management, M Individual Consult IBRD / 89020 Post Limited 0.00 Signed 2023-05-24 2023-05-26 2023-05-29 2023-05-29 2023-06-19 2023-06-07 2023-07-24 2023-06-15 2024-06-30 .1.46 / Project Management onitoring and Evaluation ant Selection Assistant 2. Expanding the access to MK-MLSP-381018-CS-INDV-3 Individual Consult IBRD / 89020 and improving of the quality Post Open - National 0.00 Signed 2023-09-10 2023-09-11 2023-10-29 2023-11-15 2023-11-19 2023-11-23 2023-12-24 2023-11-17 2024-06-30 .1.48 / Coordinator for ECEC ant Selection of preschool services MK-MLSP-381021-CS-CDS-1. 1. Promoting social inclusi 3.27 / Expert for drafting Law IBRD / 89020 on through improved access Post Direct Selection Direct - National 0.00 Signed 2023-09-10 2023-09-11 2023-09-20 2023-09-15 2023-11-24 2023-09-29 2024-06-30 s and Regulations to social benefits and servic es MK-MLSP-399560-CS-INDV-3 3. Project Management, M Individual Consult .1.49 / Coordinator for Social IBRD / 89020 Post Limited 0.00 Signed 2023-12-24 2023-12-22 2023-12-29 2023-12-28 2024-01-19 2024-01-15 2024-02-05 2024-01-15 2024-06-30 onitoring and Evaluation ant Selection Services Development MK-MLSP-399562-CS-INDV-1 1. Promoting social inclusi .3.29 / Disability and Inclusio on through improved access Individual Consult IBRD / 89020 Post Limited 0.00 Signed 2023-12-24 2023-12-22 2023-12-29 2023-12-29 2024-01-19 2024-01-15 2024-02-05 2024-01-15 2024-06-30 n Consultant  in the Unit for to social benefits and servic ant Selection Analysis, Evaluation and Mon es itoring MK-MLSP-403213-CS-CDS-2. 2. Expanding the access to 2.25 / International Consulta Direct - Internation IBRD / 89020 and improving of the quality Post Direct Selection 0.00 Canceled 2024-02-11 2024-02-21 2024-04-26 2025-06-30 nt-Training Expert for Learnin al of preschool services g environment and inclusion MK-MLSP-403214-CS-CDS-2. 2. Expanding the access to 2.26 / Local Support to the I IBRD / 89020 and improving of the quality Post Direct Selection Direct - National 0.00 Canceled 2024-02-11 2024-02-21 2024-04-26 2025-06-30 nternational Consultant-Train of preschool services ing Expert for Learning envir onment and inclusion MK-MLSP-403302-CS-CDS-2. 2. Expanding the access to 2.25 / International Consulta Direct - Internation IBRD / 89020 and improving of the quality Post Direct Selection 0.00 Signed 2024-02-11 2024-01-18 2024-02-21 2024-01-22 2024-04-26 2024-01-24 2025-06-30 nt-Training Expert for Learnin al of preschool services g environment and inclusion MK-MLSP-403303-CS-CDS-2. 2. Expanding the access to 2.26 / Local Support to the I IBRD / 89020 and improving of the quality Post Direct Selection Direct - National 0.00 Canceled 2024-02-11 2024-01-18 2024-02-21 2024-04-26 2025-06-30 nternational Consultant-Train of preschool services ing Expert for Learning envir onment and inclusion MK-MLSP-461523-CS-CDS-1. 1. Promoting social inclusi Pending Impleme 2.23 / Pricing of social servic IBRD / 89020 on through improved access Post Direct Selection Direct - National 0.00 2024-11-13 2024-11-23 2025-01-27 2025-03-28 ntation es to social benefits and servic es Page 10