PROCUREMENT PLAN Project information: ORINOQUIA INTEGRATED SUSTAINABLE LANDSCAPES P167830 Project Implementation agency: WORLD WILDLIFE FUND WWF Date of the Procurement Plan: 04/08/2020 Period covered by this Procurement Plan: 04/08/2020 – 12/31/2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the documents previously approved with the Bank will be used. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Is not applicable; Works: Is not applicable PROCUREMENT Colombia : Orinoquia Integrated Sustainable Landscapes PLAN General Information Country: Colombia 2020-09-24 Bank’s Approval Date of the Original Procurement Plan: Revised Plan Date(s): (comma delineated, leave blank 2024-11-18 if none) Project ID: P167830 GPN Date: 2020-09-21 Project Name: Orinoquia Integrated Sustainable Landscapes Loan / Credit No: TF / B0740 World Wildlife Fund Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Comple Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes tion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-WWF-246732-GO-RFQ / A Project Management, Imple dquisición de equipos de cóm mentation, Coordination, Co Solicitud de cotiza Single Stage - One E puto y accesorios para el fort TF / B0740 Posterior Limited 6,800.00 6,219.08 Finalizado 2021-08-11 2021-08-27 2021-08-30 2021-10-13 2021-09-30 2021-11-20 mmunication, Monitoring an ciones nvelope alecimiento de la capacidad d Evaluation operativa de la Unidad de Co ordinación del proyecto CO-WWF-293630-GO-RFQ / Landscape management for Dotación de bienes, equipos connectivity and resilience i Solicitud de cotiza Single Stage - One E TF / B0740 Posterior Open - National 23,866.00 0.00 Finalizado 2022-09-20 2022-10-26 2022-12-07 2022-12-25 2023-04-05 y suministros para DNMI Cina n priority biodiversity and ec ciones nvelope ruco osystem services areas CO-WWF-293645-GO-RFQ / Landscape management for Dotación de bienes, equipos connectivity and resilience i Solicitud de cotiza Single Stage - One E TF / B0740 Posterior Open - National 23,886.00 0.00 Finalizado 2022-09-08 2022-10-14 2022-10-20 2022-12-13 2022-11-15 y suministros para PNN Tupar n priority biodiversity and ec ciones nvelope ro osystem services areas CO-WWF-258406-GO-RFQ / A dquisición de dos vehículos: Effective integration of envir Camionetas 4X4 mecanica, D onmental considerations at a Solicitud de cotiza Single Stage - One E iesel, una para realizar el mo TF / B0740 Posterior Open - National 90,000.00 0.00 Cancelado 2022-06-17 2022-07-30 2022-09-28 ppropriate scales in territoria ciones nvelope nitoreo de especies críticas e l and sector planning n el PNN Tuparro y otra para el área protegida del DNMI Ci naruco. Effective integration of envir CO-WWF-289464-GO-RFQ / C onmental considerations at a Solicitud de cotiza Single Stage - One E ompra de artículos de bioseg TF / B0740 Posterior Open - National 2,000.00 0.00 Cancelado 2022-09-14 2022-10-21 2022-12-20 ppropriate scales in territoria ciones nvelope uridad l and sector planning CO-WWF-323461-GO-RFQ / A dquisición de dos vehículos a Effective integration of envir utomotores tipo camioneta d onmental considerations at a Solicitud de cotiza Single Stage - One E TF / B0740 Posterior Open - National 90,000.00 0.00 Firmado 2022-11-15 2022-12-14 2022-12-21 2023-03-14 oble cabina, 4x4, para el Par ppropriate scales in territoria ciones nvelope que Nacional Natural El Tupa l and sector planning rro y para el área protegida d el DNMI Cinaruco. CO-WWF-308898-GO-RFQ / C Effective integration of envir ompra de equipos de segurid onmental considerations at a Solicitud de cotiza Single Stage - One E TF / B0740 Posterior Open - National 11,272.00 0.00 Cancelado 2022-08-27 2022-09-19 2022-11-18 ad y equipo y accesorios de c ppropriate scales in territoria ciones nvelope ómputo l and sector planning Effective integration of envir CO-WWF-343458-GO-RFQ / C onmental considerations at a Solicitud de cotiza Single Stage - One E ompra de equipos y accesori TF / B0740 Posterior Limited 10,000.00 0.00 Cancelado 2023-03-15 2023-03-26 2023-06-30 ppropriate scales in territoria ciones nvelope os de cómputo - UIP l and sector planning CO-WWF-343422-GO-RFQ / C Effective integration of envir ompra de equipos de segurid onmental considerations at a Solicitud de cotiza Single Stage - One E TF / B0740 Posterior Limited 1,408.00 0.00 Cancelado 2023-03-15 2023-03-29 2023-06-30 ad (Equipo satelital), para ca ppropriate scales in territoria ciones nvelope mpo. l and sector planning Effective integration of envir CO-WWF-347054-GO-RFQ / C onmental considerations at a Solicitud de cotiza Single Stage - One E ompra de equipos de segurid TF / B0740 Posterior Open - National 1,408.00 0.00 Finalizado 2023-04-10 2023-04-25 2023-05-19 2023-06-30 2023-06-19 ppropriate scales in territoria ciones nvelope ad (Equipo satelital) l and sector planning Effective integration of envir CO-WWF-347056-GO-RFQ / C onmental considerations at a Solicitud de cotiza Single Stage - One E ompra de equipos y accesori TF / B0740 Posterior Open - National 10,000.00 0.00 Finalizado 2023-04-01 2023-04-25 2023-05-04 2023-06-30 2023-05-12 ppropriate scales in territoria ciones nvelope os de cómputo - UIP l and sector planning Landscape management for CO-WWF-376689-GO-RFQ / connectivity and resilience i Solicitud de cotiza Single Stage - One E Drones para monitoreo de las TF / B0740 Posterior Open - National 10,256.00 0.00 Cancelado 2023-09-16 2023-09-24 2023-11-23 n priority biodiversity and ec ciones nvelope actividades de restauración osystem services areas CO-WWF-404869-GO-RFQ / A dquirir un dron con sus respe Effective integration of envir ctivos accesorios y un servid onmental considerations at a Solicitud de cotiza Single Stage - One E or para el apoyo y seguimien TF / B0740 Posterior Open - National 17,756.13 0.00 Firmado 2024-02-07 2024-03-06 2024-03-12 2024-05-05 ppropriate scales in territoria ciones nvelope to a los acuerdos voluntarios l and sector planning de restauración y fortalecimi ento a Corporinoquia en gesti ón y acceso de información. CO-WWF-384605-GO-RFQ / A dquirir un dron con sus respe Effective integration of envir ctivos accesorios y un servid onmental considerations at a Solicitud de cotiza Single Stage - One E or para el apoyo y seguimien TF / B0740 Posterior Open - National 25,641.00 0.00 Cancelado 2023-11-02 2023-11-27 2023-12-27 ppropriate scales in territoria ciones nvelope to a los acuerdos voluntarios l and sector planning de restauración y fortalecimi ento a Corporinoquia en gesti ón y acceso de información. CO-WWF-410872-NC-RFQ / C ompra de equipos y artes de Effective integration of envir pesca legales para el proyect onmental considerations at a Solicitud de cotiza Single Stage - One E o GEF Orinoquia, que respon TF / B0740 Posterior Open - National 7,692.00 0.00 Firmado 2024-03-09 2024-04-05 2024-05-09 2024-05-05 ppropriate scales in territoria ciones nvelope dan a las necesidades previa l and sector planning mente identificadas de los pe scadores en coordinación con la AUNAP Page 1 CO-WWF-421871-GO-RFQ / C ompra de equipos para puest Landscape management for a en marcha del aplicativo (vi connectivity and resilience i Solicitud de cotiza Single Stage - One E TF / B0740 Posterior Open - National 37,838.00 0.00 Cancelado 2024-07-15 2024-08-07 2024-10-06 sor) para el seguimiento de a n priority biodiversity and ec ciones nvelope cuerdos voluntarios de conse osystem services areas rvación - producción para Cor porinoquia CO-WWF-449369-GO-RFQ / A dquirir un Servidor y accesori os para el apoyo y fortalecimi Landscape management for ento a Corporinoquia en la im connectivity and resilience i Solicitud de cotiza Single Stage - One E plementación de acuerdos, s TF / B0740 Posterior Open - National 44,737.00 0.00 Firmado 2024-09-30 2024-10-14 2024-10-03 2024-12-13 n priority biodiversity and ec ciones nvelope eguimiento y monitoreo y un osystem services areas computador portátil con sus r espectivos accesorios para el apoyo de archivo del equipo de la UIP del Proyecto NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Landscape management for CO-WWF-285456-NC-RFQ / R connectivity and resilience i Solicitud de cotiza Single Stage - One E ealización de piezas audiovis TF / B0740 Posterior Open - National 11,000.00 0.00 Cancelado 2022-05-18 2022-06-30 2022-12-27 n priority biodiversity and ec ciones nvelope uales para el proyecto. osystem services areas CO-WWF-326627-NC-DIR / Pr oporcionar los servicios logíst icos de alimentación, hosped Landscape management for aje y transporte dentro del re connectivity and resilience i Adquisición direct sguardo AWIA Tuparro, para l TF / B0740 Posterior Direct - National 33,488.00 0.00 Firmado 2022-11-25 2022-11-21 2022-12-10 2022-11-21 2022-12-17 2022-12-05 2023-05-16 n priority biodiversity and ec a a realización de los talleres d osystem services areas e consulta del plan de manej o del PNN El Tuparro en el m arco de la implementación de la ruta metodológica CO-WWF-367234-NC-RFQ / Ll Landscape management for evar a cabo el taller de segur connectivity and resilience i Solicitud de cotiza Single Stage - One E idad en primeros auxilios y s TF / B0740 Posterior Open - National 5,300.00 0.00 Finalizado 2023-06-23 2023-07-12 2023-06-30 2023-07-17 2023-07-11 n priority biodiversity and ec ciones nvelope alvamiento acuático en camp osystem services areas o, para todo el personal del P royecto GEF Orinoquia. CO-WWF-375817-NC-RFQ / C ontratar servicios logísticos ( alquiler de salón, alimentació Landscape management for n y alojamiento) para socializ connectivity and resilience i Solicitud de cotiza Single Stage - One E ar el avance de la ruta declar TF / B0740 Posterior Open - National 513.00 0.00 Finalizado 2023-08-11 2023-08-31 2023-08-22 2024-02-27 2023-09-01 n priority biodiversity and ec ciones nvelope atoria de la nueva área prote osystem services areas gida nacional "Sabanas y Hu medales de Arauca" en la im plementación de la estrategi a de gobernanza local CO-WWF-376682-NC-RFQ / S ervicios logísticos para la real Landscape management for ización del segundo Comité T connectivity and resilience i Solicitud de cotiza Single Stage - One E TF / B0740 Posterior Open - National 2,564.00 0.00 Finalizado 2023-09-06 2023-09-16 2023-09-05 2023-10-16 2023-09-12 écnico del sistema regional d n priority biodiversity and ec ciones nvelope e Áreas Protegida de la Orino osystem services areas quía, para el proyecto GEF Or inoquia. CO-WWF-383254-NC-RFQ / C ontratar servicios logísticos ( alquiler de salón, alimentació Landscape management for n y alojamiento) para el desa connectivity and resilience i Solicitud de cotiza Single Stage - One E rrollo del V Encuentro Biodive TF / B0740 Posterior Open - National 5,385.00 0.00 Finalizado 2023-09-27 2023-10-19 2023-09-05 2023-12-18 2023-12-09 n priority biodiversity and ec ciones nvelope rsirap Orinoquia - foro con se osystem services areas ctores productivos en el marc o de la implementación del pl an de acción del Sistema Reg ional de Áreas Pro CO-WWF-383258-NC-RFQ / R ealizar la impresión y distribu ción de varias piezas de com Landscape management for unicación gráfica del Proyect connectivity and resilience i Solicitud de cotiza Single Stage - One E o GEF Paisajes Integrados So TF / B0740 Posterior Open - National 4,103.00 0.00 Finalizado 2023-09-30 2023-10-21 2023-10-10 2023-11-20 2023-12-09 n priority biodiversity and ec ciones nvelope stenibles de la Orinoquia (P1 osystem services areas 67830) Colombia, enmarcada s dentro de su estrategia de comunicación. Se incluyen (L ote 1, Lote 2). CO-WWF-394990-NC-RFQ / R ealizar la producción/impresi ón y distribución de varias pi Landscape management for ezas de datación y comunica connectivity and resilience i Solicitud de cotiza Single Stage - One E ción gráfica del Proyecto GEF TF / B0740 Posterior Open - National 4,615.00 0.00 Firmado 2023-12-03 2023-12-27 2024-01-18 2024-01-26 n priority biodiversity and ec ciones nvelope Paisajes Integrados Sostenibl osystem services areas es de la Orinoquia (P167830) Colombia, enmarcadas dentr o de su estrategia de comuni cación. Lote 1 Y 2 Landscape management for CO-WWF-394988-NC-RFQ / E connectivity and resilience i Solicitud de cotiza Single Stage - One E vento de planeación POA 202 TF / B0740 Posterior Open - National 4,102.00 0.00 Cancelado 2023-12-06 2023-12-26 2024-01-25 n priority biodiversity and ec ciones nvelope 4 del proyecto GEF Orinoquia osystem services areas CO-WWF-404875-NC-RFQ / C ontratar servicios logísticos ( Landscape management for servicio de catering y alojami connectivity and resilience i Solicitud de cotiza Single Stage - One E ento) para el desarrollo de la TF / B0740 Posterior Open - National 4,615.38 0.00 Finalizado 2024-01-26 2024-02-09 2024-02-05 2024-03-10 2024-03-04 n priority biodiversity and ec ciones nvelope Misión del Banco Mundial par osystem services areas a el Proyecto GEF Orinoquia, en la ciudad de Bogotá. Se in cluye (Lote 1, Lote 2). CO-WWF-404878-NC-RFQ / S Landscape management for ervicios de difusión de conte connectivity and resilience i Solicitud de cotiza Single Stage - One E TF / B0740 Posterior Open - National 5,128.21 0.00 Cancelado 2024-08-20 2024-09-10 2024-10-10 nidos en emisoras comunitari n priority biodiversity and ec ciones nvelope as y locales en las zonas de i osystem services areas ntervención. CO-WWF-410873-NC-RFQ / R ealizar la impresión y distribu Effective integration of envir ción de piezas de comunicaci onmental considerations at a Solicitud de cotiza Single Stage - One E ón gráfica del Proyecto GEF p TF / B0740 Posterior Open - National 1,282.00 0.00 Firmado 2024-03-06 2024-04-05 2024-03-13 2024-05-05 ppropriate scales in territoria ciones nvelope ara acompañar la implement l and sector planning ación de la resolución de rec ursos pesqueros para la cuen ca del río Bita (Vichada)”. Page 2 CO-WWF-417211-NC-RFQ / S ervicios logísticos (alquiler de salón, alimentación y alojami Landscape management for ento) para el desarrollo del T connectivity and resilience i Solicitud de cotiza Single Stage - One E TF / B0740 Posterior Open - National 6,842.00 0.00 Firmado 2024-04-02 2024-04-25 2024-04-15 2024-04-28 aller de capacitación sobre a n priority biodiversity and ec ciones nvelope cuerdos de conservación – pr osystem services areas oducción con organizaciones de base en la Orinoquia en el marco de la implementación de los acu CO-WWF-421869-NC-RFQ / C Landscape management for ontratar servicios logísticos p connectivity and resilience i Solicitud de cotiza Single Stage - One E ara el desarrollo del taller par TF / B0740 Posterior Limited - National 4,325.00 0.00 Firmado 2024-04-20 2024-04-18 2024-04-25 2024-04-22 2024-05-10 n priority biodiversity and ec ciones nvelope a la construcción del plan de osystem services areas manejo del género Hydrocho erus spp en Colombia CO-WWF-430981-NC-RFQ / C ontratar servicios logísticos ( servicio de catering y alojami Landscape management for ento) para el desarrollo del ta connectivity and resilience i Solicitud de cotiza Single Stage - One E ller de seguridad, Comité Téc TF / B0740 Posterior Open - National 2,165.00 0.00 Firmado 2024-06-08 2024-06-18 2024-06-18 2024-07-03 n priority biodiversity and ec ciones nvelope nico y comité directivo para e osystem services areas l Proyecto GEF Orinoquia, en la ciudad de Bogotá. (Lote 1: servicio de catering Lote 2: Alojamiento). CO-WWF-435366-NC-RFQ / C ontratar servicios logísticos ( alquiler de salón, alimentació Landscape management for n y alojamiento) para el desa connectivity and resilience i Solicitud de cotiza Single Stage - One E TF / B0740 Posterior Open - National 2,368.00 0.00 Firmado 2024-07-02 2024-07-20 2024-07-05 2024-08-19 rrollo del segundo comité téc n priority biodiversity and ec ciones nvelope nico del Sistema Regional de osystem services areas Áreas Protegidas -SIRAP Orin oquia, en la ciudad de Yopal, Casanare. CO-WWF-436249-NC-RFQ / C ontratar servicios logísticos p ara el desarrollo de la reunió Landscape management for n con Juntas De Acción Comu connectivity and resilience i Solicitud de cotiza Single Stage - One E nal (JAC) de los municipios de TF / B0740 Posterior Open - National 1,579.00 0.00 Firmado 2024-07-05 2024-07-14 2024-07-11 2024-07-24 n priority biodiversity and ec ciones nvelope Arauquita y Arauca, como pa osystem services areas rte de la dinamización del co mponente de gobernanza de la iniciativa de conservación Áreas Protegidas CO-WWF-436626-NC-RFQ / I Effective integration of envir mpresión de piezas de comu onmental considerations at a Solicitud de cotiza Single Stage - One E nicación relacionadas con el TF / B0740 Posterior Open - National 1,842.00 0.00 Cancelado 2024-10-22 2024-11-19 2025-01-18 ppropriate scales in territoria ciones nvelope apoyo a la ordenación pesqu l and sector planning era en la cuenca del río Bita, Vichada. CO-WWF-437734-NC-RFQ / C ontratar servicios de catering Landscape management for para el desarrollo Taller meto connectivity and resilience i Solicitud de cotiza Single Stage - One E TF / B0740 Posterior Open - National 422.00 0.00 Firmado 2024-07-22 2024-08-08 2024-08-14 2024-08-23 dologías para Estructura Ecol n priority biodiversity and ec ciones nvelope ógica Principal (EEP) para el osystem services areas Proyecto GEF Orinoquia, en l a ciudad de Bogotá. CO-WWF-436625-NC-RFQ / I Landscape management for mpresión de piezas gráficas s connectivity and resilience i Solicitud de cotiza Single Stage - One E TF / B0740 Posterior Open - National 1,579.00 0.00 Firmado 2024-08-20 2024-09-15 2024-09-06 2024-11-14 obre procesos del proyecto G n priority biodiversity and ec ciones nvelope EF Orinoquia en el departam osystem services areas ento del Vichada CO-WWF-448219-NC-RFQ / C ontratar servicio de alojamie Landscape management for nto, alimentación, salon de e connectivity and resilience i Solicitud de cotiza Single Stage - One E TF / B0740 Posterior Open - National 8,974.00 0.00 Firmado 2024-09-05 2024-09-09 2024-09-09 2024-10-09 ventos, para llevar a cabo la n priority biodiversity and ec ciones nvelope misión con el Banco Mundial, osystem services areas del 10 al 13 de septiembre d e 2024. CO-WWF-436627-NC-RFQ / C ontratar servicios logísticos ( alquiler de salón, alimentació Landscape management for n y alojamiento) para el desa connectivity and resilience i Solicitud de cotiza Single Stage - One E Ejecución pe TF / B0740 Posterior Open - National 4,250.00 0.00 2024-11-15 2024-11-29 2024-12-07 rrollo del Evento “Firma de a n priority biodiversity and ec ciones nvelope ndiente cuerdos de conservación – pr osystem services areas oducción Conectando la Orin oquia” en la ciudad de Yopal, Casanare. CO-WWF-436629-NC-RFQ / S ervicios logísticos (alquiler de salón, alimentación y alojami Effective integration of envir ento) para el desarrollo de 2 onmental considerations at a Solicitud de cotiza Single Stage - One E Ejecución pe eventos, (Taller construcción TF / B0740 Posterior Open - National 4,250.00 0.00 2024-11-14 2024-11-24 2024-12-24 ppropriate scales in territoria ciones nvelope ndiente conjunta visión intergeneraci l and sector planning onal del Ramsar Río Bita y Ta ller de fortalecimiento de cap acidades Cuenca Rio Bita - Pu erto Carreño. CO-WWF-410875-NC-RFQ / R ealizar publicaciones como re Effective integration of envir sultado de los programas de onmental considerations at a Solicitud de cotiza Single Stage - One E Ejecución pe monitoreo y educación ambie TF / B0740 Posterior Open - National 5,263.00 0.00 2024-12-02 2024-12-20 2025-02-18 ppropriate scales in territoria ciones nvelope ndiente ntal para niños y jóvenes de l and sector planning Tuparro y Cinaruco. Impresio nes del material para Tuparro (diseñado por GEF SINAP). CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Techni Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes cal Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-WWF-265787-CS-QCBS / Consultoría para el levantami ento de información ambient Effective integration of envir al clave en las áreas abastec onmental considerations at a Selección basada edoras de los municipios a in TF / B0740 Posterior Open - National 439,749.00 0.00 Firmado 2021-12-01 2021-11-25 2021-12-10 2022-01-05 2022-03-18 2022-01-20 2022-05-20 2022-01-26 2022-06-24 2022-02-08 2022-08-01 2022-02-14 2022-08-31 2023-07-13 ppropriate scales in territoria en calidad y costo tervenir para la identificación l and sector planning de la EEP y la frontera agrícol a para su integración en la pl aneación territorial y sectoria l a escalas aprop CO-WWF-285173-CS-QCBS / Landscape management for Lineamientos para la gestión Selección basada connectivity and resilience i y ordenamiento ambiental de TF / B0740 Posterior en calificaciones d Open - National 121,806.00 0.00 Finalizado 2022-04-29 2022-09-05 2022-05-09 2022-06-08 2022-10-28 2022-06-13 2023-03-13 2022-06-23 2023-04-03 2023-06-23 2023-11-15 n priority biodiversity and ec la Reserva de la Biósfera El T e consultores osystem services areas uparro formulados y ruta de i mplementación Page 3 CO-WWF-285176-CS-QCBS / Identificación actores (produc tores, asociaciones de produc Landscape management for tores y autoridades locales), connectivity and resilience i Selección basada diseño de estrategia de apro TF / B0740 Posterior Open - National 547,321.00 0.00 Cancelado 2023-02-15 2023-03-02 2023-05-01 2023-05-11 2023-05-21 2023-06-10 2023-06-20 2024-06-19 n priority biodiversity and ec en calidad y costo ximación, sensibilización y ne osystem services areas gociación para la firma de ac uerdos que favorezcan la con ectividad, firma implementac ión de los acuerdos. Landscape management for CO-WWF-293612-CS-CQS / R Selección basada connectivity and resilience i ealización de piezas audiovis TF / B0740 Posterior en calificaciones d Open - National 12,300.00 0.00 Firmado 2022-07-15 2022-10-10 2022-07-20 2022-08-10 2022-12-14 2022-08-16 2023-04-12 2022-08-22 2023-04-15 2023-01-19 n priority biodiversity and ec uales e consultores osystem services areas CO-WWF-291564-CS-CQS / D Landscape management for Selección basada iseño del manual de marca d connectivity and resilience i TF / B0740 Posterior en calificaciones d Open - National 2,105.00 0.00 Cancelado 2022-05-10 2022-05-20 2022-06-14 2022-06-24 2022-07-04 2022-09-02 el proyecto, logo, imagen y la n priority biodiversity and ec e consultores presentación del proyecto. osystem services areas CO-WWF-283724-CS-QCBS / Identificación de productos d e la bioeconomía regional co Landscape management for n la participación de grupos c Selección basada connectivity and resilience i ientíficos y de investigación r TF / B0740 Posterior en calificaciones d Open - National 83,432.00 0.00 Cancelado 2022-10-07 2022-10-22 2022-11-14 2022-11-19 2022-11-28 2023-11-28 n priority biodiversity and ec egionales, comunidades, aso e consultores osystem services areas ciaciones, análisis de mercad o internacional y nacional par a al menos dos productores p riorizados por mosaico CO-WWF-298835-CS-CQS / A poyo y acompañamiento a la implementación de acciones Landscape management for priorizadas en el Plan de orde Selección basada connectivity and resilience i nación y manejo de la cuenc TF / B0740 Posterior en calificaciones d Open - National 59,700.00 0.00 Firmado 2022-08-26 2022-09-19 2022-08-30 2022-09-27 2023-02-10 2022-10-04 2023-10-27 2022-10-10 2023-11-01 2023-06-30 n priority biodiversity and ec a hidrográfica -POMCA- del Rí e consultores osystem services areas o Bita en articulación con el p lan de manejo Rámsar Río Bit a. y fortalecimiento y dinamiz ación del funcionamiento CO-WWF-298681-CS-CQS / F ormulación Plan de manejo d Landscape management for Selección basada e la Reserva Forestal Protect connectivity and resilience i TF / B0740 Posterior en calificaciones d Open - National 121,806.00 0.00 Firmado 2022-08-26 2022-11-04 2022-08-30 2022-09-25 2023-04-14 2022-09-27 2023-11-30 2022-10-03 2023-12-01 2023-06-30 ora Nacional Cuenca Alta del n priority biodiversity and ec e consultores Río Satocá formulado y repor osystem services areas te del avance del proceso de adopción por parte del MADS CO-WWF-309087-CS-CQS / C Landscape management for Selección basada onsultoría para llevar a cabo l connectivity and resilience i TF / B0740 Posterior en calificaciones d Open - National 26,500.00 0.00 Cancelado 2022-08-26 2022-09-09 2022-10-28 2022-10-29 2022-10-30 2023-01-28 a Evaluación de medio térmi n priority biodiversity and ec e consultores no osystem services areas CO-WWF-309117-CS-CQS / C Project Management, Imple Selección basada ontratación Auditoria del Pro TF / B0740 mentation, Coordination, Co Posterior en calificaciones d Open - National 5,704.00 0.00 Cancelado 2022-09-05 2022-11-11 2022-09-19 2022-11-07 2022-11-11 2022-11-14 2023-02-12 yecto mmunication, Monitoring an e consultores d Evaluation CO-WWF-329045-CS-CQS / C Project Management, Imple Selección basada ontratacion auditoria del proy TF / B0740 mentation, Coordination, Co Posterior en calificaciones d Limited 5,704.00 0.00 Finalizado 2022-12-12 2022-11-14 2023-01-26 2023-03-07 2023-01-31 2023-04-24 2023-02-04 2023-04-28 2023-05-15 2023-08-17 ecto GEF Orinoquia mmunication, Monitoring an e consultores d Evaluation CO-WWF-309153-CS-CQS / F ormular los planes integrales de manejo para los corredore Landscape management for s de las especies amenazada Selección basada connectivity and resilience i s y en conflicto con los actore TF / B0740 Posterior en calificaciones d Open - National 50,323.00 0.00 Firmado 2023-01-10 2023-02-21 2023-01-24 2023-02-05 2023-04-21 2023-02-08 2023-11-30 2023-02-12 2023-12-01 2023-06-30 n priority biodiversity and ec s productivos y comunidades e consultores osystem services areas étnicas, en el mosaico Cocuy- Piedemonte-Cinaruco, Panthe ra onca (jaguar) y Tapirus ter restris (tapir). CO-WWF-285172-CS-QCBS / Effective integration of envir Selección basada Desarrollo de estudios de an onmental considerations at a TF / B0740 Posterior en calificaciones d Open - National 60,000.00 0.00 Cancelado 2022-05-02 2022-07-07 2022-05-17 2022-06-11 2022-10-07 2022-06-16 2022-06-26 2023-06-26 álisis de dinámica Hídrica y P ppropriate scales in territoria e consultores ulsos de inundación (para DN l and sector planning MI Cinaruco) CO-WWF-343429-CS-CQS / D Effective integration of envir Selección basada esarrollo de estudios de análi onmental considerations at a TF / B0740 Posterior en calificaciones d Open - National 21,903.00 0.00 Firmado 2023-03-15 2023-03-16 2023-03-29 2023-05-18 2023-05-19 2023-05-21 2023-12-19 2023-05-25 2024-01-10 2023-06-20 sis de dinámica Hídrica y Puls ppropriate scales in territoria e consultores os de inundación (para DNMI l and sector planning Cinaruco) CO-WWF-309085-CS-CQS / C onsultoría para el desarrollo Landscape management for e implementación de al meno Selección basada connectivity and resilience i s 3 procesos de ordenamient TF / B0740 Posterior en calificaciones d Open - National 110,710.00 0.00 Cancelado 2022-12-02 2022-12-16 2023-02-02 2023-02-09 2023-02-16 2023-06-30 n priority biodiversity and ec o pesquero que contengan li e consultores osystem services areas neamientos técnicos de man ejo para recursos hidrobiológi cos en la cuenca del río Bita CO-WWF-285175-CS-QCBS / Consultoría para el diseño e i mplementación del protocolo Effective integration of envir de gestión de información int Selección basada onmental considerations at a erna para Corporinoquia para TF / B0740 Posterior en calificaciones d Open - National 83,705.00 0.00 Cancelado 2023-01-10 2023-01-25 2023-02-06 2023-02-08 2023-02-12 2023-06-30 ppropriate scales in territoria la gestión de metadatos, cap e consultores l and sector planning tura, manejo e incoporación de información a los subsiste mas de información que conf orman el SIAC CO-WWF-298837-CS-CQS / R Landscape management for Selección basada ealización de podcasts para e connectivity and resilience i TF / B0740 Posterior en calificaciones d Limited 9,000.00 0.00 Cancelado 2023-01-16 2023-01-31 2023-02-05 2023-02-08 2023-06-30 l proyecto GEF paisajes integ n priority biodiversity and ec e consultores rados sostenibles de la Orino osystem services areas quía CO-WWF-342854-CS-CQS / C onsultoría para la firma de ac Landscape management for Selección basada uerdos voluntarios de conser connectivity and resilience i TF / B0740 Posterior en calificaciones d Open - National 12,002.00 0.00 Cancelado 2023-04-10 2023-04-24 2023-06-01 2023-06-04 2023-06-08 2023-06-30 vación-producción que favore n priority biodiversity and ec e consultores zcan la conectividad en paisa osystem services areas jes de altillanura y acompaña miento en su implementación CO-WWF-342857-CS-CQS / C onsultoría para la firma de ac Landscape management for Selección basada uerdos voluntarios de conser connectivity and resilience i TF / B0740 Posterior en calificaciones d Open - National 12,002.00 0.00 Cancelado 2023-04-10 2023-04-24 2023-06-01 2023-06-04 2023-06-10 2023-06-30 vación-producción que favore n priority biodiversity and ec e consultores zcan la conectividad en saba osystem services areas nas inundables y acompaña miento en su implementación Page 4 CO-WWF-369983-CS-CQS / R ealizar el análisis de conectiv idad en los paisajes productiv Landscape management for os priorizados por el proyecto Selección basada connectivity and resilience i , identificar y seleccionar pre TF / B0740 Posterior en calificaciones d Open - National 38,285.00 0.00 Cancelado 2023-07-07 2023-06-30 2023-07-22 2023-09-10 2023-09-15 2023-09-24 2025-03-22 n priority biodiversity and ec dios estratégicos para diseña e consultores osystem services areas r rutas de conectividad, elab orar planes prediales particip ativos y firmar los acuerdos d e conservación CO-WWF-372356-CS-CQS / E valuar de manera tendencial la sostenibilidad de los paisaj Effective integration of envir es priorizados por el proyecto Selección basada onmental considerations at a y su impacto sobre la biodive TF / B0740 Posterior en calificaciones d Open - National 153,846.00 0.00 Firmado 2023-08-01 2023-07-28 2023-08-16 2023-10-07 2023-10-17 2023-10-11 2024-07-02 2023-10-15 2024-07-02 2024-10-14 ppropriate scales in territoria rsidad y los SE, así como, gen e consultores l and sector planning erar una propuesta de lineam ientos técnicos que incorpore n la conservación de la biodiv ersidad y la provi CO-WWF-376685-CS-CQS / C onsultoria para la valoración Effective integration of envir Selección basada ecológica y económica y el m onmental considerations at a TF / B0740 Posterior en calificaciones d Open - National 44,308.00 0.00 Firmado 2023-09-20 2023-09-25 2023-10-05 2023-11-27 2023-11-27 2023-12-05 2024-06-04 2023-12-09 2024-06-04 2024-12-08 onitoreo de servicios ecosisté ppropriate scales in territoria e consultores micos priorizados en funcion l and sector planning amiento para PNN el Tuparro y DNMI Cinaruco CO-WWF-376692-CS-CQS / F ormular una versión actualiza da del Plan de Gestión Ambie Effective integration of envir ntal Regional – PGAR; instru Selección basada onmental considerations at a mento de planificación estra TF / B0740 Posterior en calificaciones d Open - National 102,564.00 0.00 Firmado 2023-09-01 2023-08-31 2023-09-16 2023-11-08 2023-10-24 2023-11-16 2024-05-09 2023-11-20 2024-05-09 2024-04-18 ppropriate scales in territoria tégico de la Corporación Autó e consultores l and sector planning noma Regional de la Orinoqui a – CORPORINOQUIA, para el horizonte de planificación 20 24-2035, en la jurisdicción CO-WWF-383260-CS-CQS / C onsultoría para la firma de ac Landscape management for Selección basada uerdos voluntarios de conser connectivity and resilience i TF / B0740 Posterior en calificaciones d Open - National 88,385.00 0.00 Firmado 2023-09-25 2023-09-28 2023-10-07 2023-11-26 2023-09-29 2023-11-29 2024-02-16 2023-12-23 2024-02-20 2025-06-15 vación-producción que favore n priority biodiversity and ec e consultores zcan la conectividad en saba osystem services areas nas inundables y acompaña miento en su implementación CO-WWF-387183-CS-CQS / R ealizar el análisis de conectiv idad en los paisajes productiv Landscape management for os priorizados por el proyecto Selección basada connectivity and resilience i , identificar y seleccionar pre TF / B0740 Posterior en calificaciones d Open - National 88,385.00 0.00 Firmado 2023-10-20 2023-11-01 2023-11-03 2023-12-25 2023-12-18 2023-12-28 2024-04-02 2024-01-02 2024-04-02 2025-06-25 n priority biodiversity and ec dios estratégicos para diseña e consultores osystem services areas r rutas de conectividad, elab orar planes prediales particip ativos y firmar los acuerdos d e conservación CO-WWF-342861-CS-CQS / C onsultoría para la adaptación Landscape management for Selección basada del modelo ITPS para ganade connectivity and resilience i TF / B0740 Posterior en calificaciones d Open - National 27,906.00 0.00 Cancelado 2023-05-20 2023-05-30 2023-06-22 2023-06-25 2023-06-29 2023-06-30 ría sostenible en piedemonte, n priority biodiversity and ec e consultores sabana inundable y altillanur osystem services areas a y validación del instrument o financiero CO-WWF-369976-CS-CQS / R ealizar el análisis de conectiv idad en los paisajes productiv Landscape management for os priorizados por el proyecto Selección basada connectivity and resilience i , identificar y seleccionar pre TF / B0740 Posterior en calificaciones d Open - National 38,285.00 0.00 Cancelado 2023-07-07 2023-06-30 2023-07-22 2023-09-10 2023-09-13 2023-09-18 2025-03-16 n priority biodiversity and ec dios estratégicos para diseña e consultores osystem services areas r rutas de conectividad, elab orar planes prediales particip ativos y firmar los acuerdos d e conservación CO-WWF-396132-CS-CQS / D iseñar e implementar la estra tegia de restauración ecológi Landscape management for ca con la participación de act Selección basada connectivity and resilience i ores locales clave, firma de a TF / B0740 Posterior en calificaciones d Open - National 210,260.00 0.00 Firmado 2023-12-13 2023-12-14 2023-12-27 2024-02-17 2024-01-30 2024-03-03 2024-05-27 2024-03-11 2024-05-27 2025-05-10 n priority biodiversity and ec cuerdos con asociaciones de e consultores osystem services areas base para la implementación de acciones, y la ubicación d e las áreas a intervenir sobre rondas hídricas afe CO-WWF-398623-CS-CQS / Li derar el proceso de identifica Landscape management for Selección basada ción, priorización y fortalecim connectivity and resilience i TF / B0740 Posterior en calificaciones d Open - National 79,487.00 0.00 Firmado 2023-12-20 2023-12-15 2024-01-03 2024-02-22 2024-02-13 2024-02-28 2024-05-06 2024-03-09 2024-05-20 2025-03-09 iento de 4 iniciativas de la bi n priority biodiversity and ec e consultores oeconomía en la Orinoquia y osystem services areas lograr la vinculación de 2 inic iativas a la plataforma Invest. CO-WWF-404841-CS-CQS / D Landscape management for iseño y puesta en marcha del Selección basada connectivity and resilience i aplicativo (visor) para el segu TF / B0740 Posterior en calificaciones d Open - National 38,461.54 0.00 Cancelado 2024-04-10 2024-04-24 2024-06-12 2024-06-17 2024-06-21 2024-12-18 n priority biodiversity and ec imiento de acuerdos voluntar e consultores osystem services areas ios de conservación - producc ión para Corporinoquia. CO-WWF-421830-CS-CQS / R Landscape management for Selección basada ealización de piezas audiovis connectivity and resilience i TF / B0740 Posterior en calificaciones d Open - National 16,216.00 0.00 Cancelado 2024-08-13 2024-08-27 2024-09-23 2024-09-27 2024-10-06 2025-02-14 uales para el proyecto GEF p n priority biodiversity and ec e consultores aisajes integrados sostenible osystem services areas s de la Orinoquía CO-WWF-436631-CS-CQS / G enerar la información necesa Landscape management for ria para el desarrollo de tres Selección basada connectivity and resilience i marcos de referencia agroec TF / B0740 Posterior en calificaciones d Open - National 37,895.00 0.00 En ejecución 2024-07-22 2024-07-23 2024-08-05 2024-09-07 2024-09-30 2024-09-11 2024-09-20 2025-03-19 n priority biodiversity and ec onómicos para los sistemas g e consultores osystem services areas anaderos piedemonte, altilla nura y sabanas inundables, e n la Orinoquía colombiana. CO-WWF-404867-CS-CQS / R ealizar un paquete de piezas audiovisuales con videos doc Landscape management for Selección basada umentales, historias en audio connectivity and resilience i Ejecución pendien TF / B0740 Posterior en calificaciones d Open - National 35,000.00 0.00 2024-11-15 2024-11-29 2024-12-27 2024-12-31 2025-01-09 2025-05-09 (tipo podcast) y un catálogo n priority biodiversity and ec te e consultores de fotografías, que den cuent osystem services areas a de los impactos y logros del proyecto GEF y que contribuy an al posicionamiento de la O rinoquia. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 5 CO-WWF-192634-CS-CQS / R esponsable de realizar los pr ocesos de adquisiciones y co Project Management, Imple ntrataciones que se requiera mentation, Coordination, Co n, de conformidad con lo esta TF / B0740 Posterior Individual Limited 89,906.00 0.00 Cancelado 2020-09-22 2020-09-30 2020-09-27 2020-10-18 2020-11-22 2023-06-30 mmunication, Monitoring an blecido en el Acuerdo Legal, d Evaluation el Manual Operativo del Proy ecto, el Plan de Adquisiciones , las Regulaciones de adquisi ciones del Banco CO-WWF-192637-CS-INDV / El Especialista Financiero, ser á responsable de la gestión fi Project Management, Imple nanciera y administrativa del mentation, Coordination, Co Proyecto, de conformidad co TF / B0740 Posterior Individual Limited 96,110.00 0.00 Cancelado 2020-09-22 2020-09-30 2020-09-27 2020-10-18 2020-11-22 2023-06-30 mmunication, Monitoring an n lo establecido en el Acuerd d Evaluation o Legal, el MOP, el PA, las reg ulaciones financieras y de ad quisiciones del Banco, de W WF y demás normas. CO-WWF-188773-CS-CDS / El Coordinador del proyecto se Effective integration of envir encargará de asegurar la coo onmental considerations at a rdinación e integralidad de lo TF / B0740 Posterior Individual Direct 231,527.00 0.00 Cancelado 2020-10-01 2020-10-07 2020-10-06 2020-10-08 2020-10-20 2023-07-09 ppropriate scales in territoria s aspectos técnicos, administ l and sector planning rativos, logísticos y legales q ue se requieran para la ejecu ción de éste. Effective integration of envir CO-WWF-210819-CS-INDV / onmental considerations at a El Especialista de Planeación TF / B0740 Posterior Individual Limited 110,555.00 37,728.00 Finalizado 2021-01-12 2021-06-09 2021-01-17 2021-07-27 2021-02-07 2021-08-03 2021-03-14 2021-08-11 2022-03-14 2023-06-15 ppropriate scales in territoria y Monitoreo l and sector planning CO-WWF-210836-CS-INDV / Landscape management for Especialista en Salvaguardas/ connectivity and resilience i TF / B0740 Posterior Individual Limited 119,929.00 0.00 Cancelado 2021-01-12 2021-05-10 2021-01-17 2021-02-07 2021-03-14 2022-03-14 Estándares Sociales, particip n priority biodiversity and ec ación y gobernanza osystem services areas Effective integration of envir CO-WWF-210842-CS-INDV / onmental considerations at a Especialista en Salvaguardas/ TF / B0740 Posterior Individual Limited 119,929.00 0.00 Cancelado 2021-01-12 2021-05-10 2021-01-17 2021-02-07 2021-03-14 2022-03-14 ppropriate scales in territoria Estándares Ambientales l and sector planning CO-WWF-223879-CS-INDV / El Coordinador del proyecto s Effective integration of envir e encargará de asegurar la c onmental considerations at a oordinación e integralidad de TF / B0740 Posterior Individual Direct 42,857.00 36,474.78 Finalizado 2021-05-10 2021-05-12 2021-05-15 2021-05-13 2021-05-22 2021-05-24 2021-05-29 2021-06-01 2022-05-28 2022-06-04 ppropriate scales in territoria los aspectos técnicos, admini l and sector planning strativos, logísticos y legales que se requieran para la ejec ución de éste. CO-WWF-232274-CS-INDV / El Especialista de Adquisicion es, será́ responsable de realiz Project Management, Imple ar los procesos de adquisicio mentation, Coordination, Co TF / B0740 Posterior Individual Direct 77,202.00 23,446.44 Firmado 2021-05-10 2021-05-07 2021-05-13 2021-05-12 2021-05-20 2021-05-24 2021-05-25 2021-06-07 2022-05-24 nes y contrataciones que se r mmunication, Monitoring an equieran, de conformidad co d Evaluation n lo establecido en el Acuerd o Legal, el Manual Operativo del Proyecto, el PA, las Regul aciones (...) CO-WWF-233338-CS-INDV / El Especialista Ambiental- Sal vaguardas es el encargado d Effective integration of envir e orientar y asesorar técnica onmental considerations at a TF / B0740 Posterior Individual Direct 200,503.00 64,451.50 Firmado 2021-05-17 2021-05-10 2021-05-27 2021-05-28 2021-05-31 2021-05-31 2021-06-02 2021-06-18 2022-06-01 mente a la UIP en temas am ppropriate scales in territoria bientales así como la articula l and sector planning ción del proyecto con iniciati vas y actores claves en regió n y socios del proyecto (...) CO-WWF-192637-CS-INDV-2 / El Especialista Financiero, s erá responsable de la gestión Project Management, Imple financiera y administrativa d mentation, Coordination, Co TF / B0740 Posterior Individual Direct 83,230.00 24,385.66 Firmado 2021-05-18 2021-05-13 2021-05-23 2021-05-13 2021-05-30 2021-05-24 2021-06-04 2021-06-01 2022-06-03 el Proyecto, de conformidad mmunication, Monitoring an con lo establecido en el Acue d Evaluation rdo Legal, el MOP, el PA, las r egulaciones financieras y de adquisiciones del Banco. CO-WWF-238941-CS-INDV / El Especialista en Salvaguard as Sociales, participación y g Landscape management for obernanza es el encargado d connectivity and resilience i e asegurar que las actividade TF / B0740 Posterior Individual Limited 114,046.00 31,131.53 Finalizado 2021-06-09 2021-06-10 2021-06-16 2021-07-27 2021-06-30 2021-08-09 2021-07-13 2021-08-13 2022-07-12 2022-11-01 n priority biodiversity and ec s del proyecto en campo y ofi osystem services areas cina, incluyen las medidas ne cesarias para anticipar, evita r, minimizar, mitigar o compe nsar los riesgos (...) CO-WWF-242725-CS-INDV / Liderar la implementación de las acciones relacionadas con Landscape management for paisajes y sistemas productiv connectivity and resilience i os sostenibles contempladas TF / B0740 Posterior Individual Open 121,720.00 0.00 Cancelado 2021-07-16 2021-08-23 2021-08-13 2021-08-16 2021-08-25 2022-08-25 n priority biodiversity and ec por el proyecto, en las áreas osystem services areas de intervención del mismo, b ajo los lineamientos de trabaj o de WWF Colombia en siste mas alimentarios sostenib CO-WWF-242879-CS-INDV / El profesional de Áreas Prote Landscape management for gidas se encargará de orient connectivity and resilience i ar técnicamente y liderar el d TF / B0740 Posterior Individual Limited 63,948.00 22,202.04 Finalizado 2021-07-16 2021-07-21 2021-07-26 2021-08-05 2021-07-30 2021-08-31 2021-08-05 2021-09-19 2022-08-05 2023-06-15 n priority biodiversity and ec esarrollo de las actividades d osystem services areas el proyecto relacionadas con áreas protegidas (nuevas áre as, efectividad de manejo). CO-WWF-242882-CS-INDV / El profesional de Ecosistemas Estratégicos prestará sus ser Landscape management for vicios profesionales orientan connectivity and resilience i do técnicamente y liderando TF / B0740 Posterior Individual Limited 63,948.00 22,300.32 Finalizado 2021-07-16 2021-07-21 2021-07-23 2021-08-23 2021-07-28 2021-09-30 2021-08-06 2021-10-13 2022-08-06 2023-06-15 n priority biodiversity and ec el desarrollo de las actividad osystem services areas es del proyecto Paisajes Inte grados Sostenibles de la Orin oquía (P167830) relacionada s con ecosistemas estrat CO-WWF-247722-CS-INDV / Landscape management for Comunicador del proyecto en connectivity and resilience i cargado de diseñar e implem TF / B0740 Posterior Individual Open 75,933.00 22,175.16 Finalizado 2021-08-13 2021-08-13 2021-09-02 2021-08-23 2021-09-06 2021-09-29 2021-09-11 2021-10-22 2022-09-11 n priority biodiversity and ec entar la estrategia de comuni osystem services areas caciones del proyecto en arti culación con la UIP. Page 6 Landscape management for CO-WWF-257258-CS-INDV / connectivity and resilience i Especialista de Paisajes y Sist TF / B0740 Posterior Individual Open 107,142.00 30,879.53 Finalizado 2021-10-08 2021-10-01 2021-10-26 2021-10-11 2021-10-28 2021-12-02 2021-11-01 2021-12-15 2022-11-01 2023-06-15 n priority biodiversity and ec emas Productivos osystem services areas CO-WWF-261246-CS-CDS / El Asistente administrativo, apo Project Management, Imple yará a la Unidad de Impleme mentation, Coordination, Co ntación del Proyecto (UIP) en TF / B0740 Posterior Individual Direct 43,870.00 11,209.93 Firmado 2021-11-05 2021-10-29 2021-11-09 2021-11-02 2021-11-10 2021-10-29 2021-11-11 2021-11-11 2022-11-06 mmunication, Monitoring an la realización de las actividad d Evaluation es administrativas y logística s que faciliten la ejecución de l Proyecto CO-WWF-285444-CS-INDV / Landscape management for Apoyo a la implementación d connectivity and resilience i TF / B0740 Posterior Individual Limited 46,452.00 16,992.14 Finalizado 2022-04-04 2022-05-20 2022-04-19 2022-06-13 2022-04-24 2022-06-28 2022-05-01 2022-08-02 2023-05-01 el plan de manejo (para DN n priority biodiversity and ec MI Cinaruco) osystem services areas CO-WWF-269476-CS-INDV / Landscape management for Consutor 1, Diseño e implem connectivity and resilience i TF / B0740 Posterior Individual Limited 40,968.00 9,790.85 Finalizado 2022-03-18 2022-04-05 2022-04-07 2022-04-08 2022-04-15 2022-05-16 2022-05-01 2022-06-19 2022-12-27 entación de estrategia de soc n priority biodiversity and ec ialización y convocatoria (par osystem services areas a nuevas RNSC), CO-WWF-269471-CS-INDV / Landscape management for Consutor 2, Diseño e implem connectivity and resilience i TF / B0740 Posterior Individual Limited 40,967.00 10,123.78 Finalizado 2022-03-21 2022-04-05 2022-04-08 2022-04-08 2022-04-18 2022-05-23 2022-05-01 2022-06-19 2022-12-27 entación de estrategia de soc n priority biodiversity and ec ialización y convocatoria (par osystem services areas a nuevas RNSC), Landscape management for CO-WWF-285446-CS-INDV / connectivity and resilience i Consultor 1, Diagnóstico de c TF / B0740 Posterior Individual Open 6,842.00 0.00 Cancelado 2022-04-04 2022-05-09 2022-05-17 2022-06-01 2022-09-29 n priority biodiversity and ec onflicto social y ambiental osystem services areas CO-WWF-285447-CS-INDV / Landscape management for Consultor 2, Caracterización connectivity and resilience i TF / B0740 Posterior Individual Open 6,842.00 0.00 Cancelado 2022-04-04 2022-05-13 2022-05-21 2022-06-01 2022-09-29 de actores e intereses como i n priority biodiversity and ec nsumo para la consolidación osystem services areas del centro regional CO-WWF-293454-CS-INDV / Coordinador para la impleme ntación del programa de mon Effective integration of envir itoreo y el portafolio de proye onmental considerations at a TF / B0740 Posterior Individual Open 18,456.00 0.00 Finalizado 2022-06-24 2022-06-29 2022-07-15 2022-07-21 2022-07-18 2022-09-13 2022-07-22 2022-09-21 2023-07-22 2023-06-20 ctos de investigación del PNN ppropriate scales in territoria El Tuparro, análisis de la infor l and sector planning mación y elaboración de infor me con recomendaciones de manejo. CO-WWF-293648-CS-INDV / Profesional 2. Implementació Effective integration of envir n de los protocolos de monito onmental considerations at a reo y desarrollo de actividade TF / B0740 Posterior Individual Open 7,558.00 0.00 Cancelado 2022-08-22 2022-09-14 2022-09-16 2022-09-20 2023-03-19 ppropriate scales in territoria s en campo para PNN Tuparr l and sector planning o, análisis de la información y elaboración de informe con r ecomendaciones de manejo CO-WWF-293647-CS-INDV / Profesional 1. Implementació n de los protocolos de monito Effective integration of envir reo y desarrollo de actividade onmental considerations at a s en campo para PNN Tuparr TF / B0740 Posterior Individual Open 7,558.00 0.00 Cancelado 2022-08-22 2022-09-12 2022-09-14 2022-09-19 2023-03-18 ppropriate scales in territoria o, análisis de la información y l and sector planning elaboración de informe con r ecomendaciones de manejo, esta subactividad se enmarc a en la actividad No. 1.2.4 CO-WWF-293646-CS-INDV / Preparación, consulta e imple Landscape management for mentación de un Marco de G connectivity and resilience i estión Ambiental y Social (M TF / B0740 Posterior Individual Open 21,838.00 0.00 Cancelado 2022-07-08 2022-08-05 2022-08-08 2022-08-12 2023-04-09 n priority biodiversity and ec GAS), Manejo Integrado de Pl osystem services areas agas y Plan de manejo soste nible para especes/poblacion es silvestre afectada. CO-WWF-298649-CS-INDV / Landscape management for Realizar el avaluo para la adq connectivity and resilience i TF / B0740 Posterior Individual Open 2,059.00 0.00 Cancelado 2022-10-21 2022-11-12 2022-11-16 2022-11-19 2022-12-19 uisición de la sede (para DNM n priority biodiversity and ec I Cinaruco) osystem services areas CO-WWF-293591-CS-INDV / Gestor local: Apoyo local/com Effective integration of envir unitario en la organización de onmental considerations at a TF / B0740 Posterior Individual Open 7,955.00 0.00 Cancelado 2022-07-11 2022-08-03 2022-08-05 2022-08-09 2023-02-05 talleres, jornadas y eventos d ppropriate scales in territoria e acercamiento, socialización l and sector planning , articulación y participación con actores clave CO-WWF-298810-CS-INDV / Especialista indígena /comuni Effective integration of envir tario en la organización de ta onmental considerations at a TF / B0740 Posterior Individual Open 5,304.00 0.00 Cancelado 2022-07-15 2022-08-05 2022-08-08 2022-08-10 2022-12-08 lleres, jornadas y eventos de ppropriate scales in territoria acercamiento, socialización, l and sector planning articulación y participación c on actores clave CO-WWF-298819-CS-INDV / Apoyo a la facilitación gráfica Effective integration of envir en la realización de talleres, j onmental considerations at a TF / B0740 Posterior Individual Open 13,365.00 0.00 Cancelado 2022-06-27 2022-07-18 2022-08-19 2022-08-22 2023-08-22 ornadas y eventos de acerca ppropriate scales in territoria miento, socialización, articula l and sector planning ción y participación con actor es clave CO-WWF-298834-CS-INDV / Landscape management for Profesional. Formulación e im connectivity and resilience i TF / B0740 Posterior Individual Open 7,056.00 0.00 Finalizado 2022-06-24 2022-06-29 2022-07-15 2022-09-05 2022-07-18 2022-08-23 2022-07-22 2022-09-14 2023-03-19 2023-06-15 plementación temprana del R n priority biodiversity and ec égimen Especial de Manejo d osystem services areas el PNN El Tuparro CO-WWF-293629-CS-INDV / Landscape management for Consultor de apoyo a la AUN connectivity and resilience i TF / B0740 Posterior Individual Open 19,355.00 0.00 Cancelado 2022-08-10 2022-09-14 2022-09-19 2022-09-29 2023-09-24 AP en la implementación del n priority biodiversity and ec POPE osystem services areas CO-WWF-293640-CS-INDV / Landscape management for Diagnóstico de conflicto socia connectivity and resilience i l y ambiental y caracterizació TF / B0740 Posterior Individual Open 10,753.00 0.00 Cancelado 2022-07-08 2022-07-29 2022-08-03 2022-08-10 2023-06-06 n priority biodiversity and ec n de actores e intereses com osystem services areas o insumo para la consolidació n del centro regional Page 7 CO-WWF-285443-CS-INDV / Acuerdos con asociaciones d Landscape management for e base para la implementació connectivity and resilience i n de acciones de Restauració TF / B0740 Posterior Individual Open 34,839.00 0.00 Cancelado 2022-08-26 2022-09-22 2022-09-26 2022-10-03 2023-10-03 n priority biodiversity and ec n de rondas de ríos priorizad osystem services areas os en Arauca (Mano de obra no calificada y otros gastos d e funcionamiento). CO-WWF-285439-CS-INDV / Consultor 1, Definición e impl Landscape management for ementación de planes integr connectivity and resilience i ados de manejo de corredore TF / B0740 Posterior Individual Open 25,161.00 0.00 Cancelado 2022-08-22 2022-09-19 2022-09-23 2022-10-03 2023-10-03 n priority biodiversity and ec s de especies amenazadas y osystem services areas de conflicto con los actores p roductivos y comunidades ét nicas CO-WWF-285442-CS-INDV / Consultor 2, Definición e imp Landscape management for lementación de planes integr connectivity and resilience i ados de manejo de corredore TF / B0740 Posterior Individual Open 25,162.00 0.00 Cancelado 2022-08-22 2022-09-19 2022-09-22 2022-09-26 2023-09-26 n priority biodiversity and ec s de especies amenazadas y osystem services areas de conflicto con los actores p roductivos y comunidades ét nicas CO-WWF-285453-CS-INDV / I Landscape management for dentificación y priorización d connectivity and resilience i e oportunidades y avance en TF / B0740 Posterior Individual Open 29,232.00 0.00 Cancelado 2022-09-15 2022-10-18 2022-10-23 2022-11-02 2023-11-02 n priority biodiversity and ec diseño y formulación o aprest osystem services areas amiento de convocatorias CO-WWF-298641-CS-INDV / Coordinador del proyecto Ase Effective integration of envir gurar la coordinación e integr onmental considerations at a alidad de los aspectos gerenc TF / B0740 Posterior Individual Direct 37,636.00 37,172.65 Rescindido 2022-06-15 2022-06-15 2022-06-16 2022-06-16 2022-06-16 2022-06-16 2022-06-17 2022-06-28 2023-06-17 2022-11-01 ppropriate scales in territoria iales, administrativos, logístic l and sector planning os y legales que se requieran para la ejecución del Proyect o. CO-WWF-285445-CS-INDV / Apoyo y acompañamiento a l Landscape management for a implementación de accione connectivity and resilience i s priorizadas en el Plan de or TF / B0740 Posterior Individual Open 25,263.00 0.00 Cancelado 2022-04-08 2022-05-06 2022-05-11 2022-05-20 2023-05-20 n priority biodiversity and ec denación y manejo de la cue osystem services areas nca hidrográfica -POMCA- del Río Bita en articulación con el plan de manejo Rámsar Río B ita CO-WWF-285450-CS-INDV / Consultor 1, Formulación Pla Landscape management for n de manejo de la Reserva Fo connectivity and resilience i restal Protectora Nacional Cu TF / B0740 Posterior Individual Open 34,883.00 0.00 Cancelado 2022-06-15 2022-08-09 2022-08-19 2022-09-01 2023-05-29 n priority biodiversity and ec enca Alta del Río Satocá form osystem services areas ulado y reporte del avance d el proceso de adopción por p arte del MADS CO-WWF-285451-CS-INDV / Consultor 2, Formulación Pla Landscape management for n de manejo de la Reserva Fo connectivity and resilience i restal Protectora Nacional Cu TF / B0740 Posterior Individual Open 34,883.00 0.00 Cancelado 2022-05-10 2022-06-29 2022-07-09 2022-07-19 2023-04-15 n priority biodiversity and ec enca Alta del Río Satocá form osystem services areas ulado y reporte del avance d el proceso de adopción por p arte del MADS CO-WWF-285452-CS-INDV / Landscape management for Fortalecer y dinamizar el fun connectivity and resilience i TF / B0740 Posterior Individual Open 34,286.00 0.00 Cancelado 2022-03-28 2022-05-23 2022-06-02 2022-06-15 2023-06-15 cionamiento del Consejo de C n priority biodiversity and ec uenca del Río Bita osystem services areas CO-WWF-285448-CS-INDV / Landscape management for Consultor 3, Gestor local para connectivity and resilience i la promoción y puesta en ma TF / B0740 Posterior Individual Open 35,526.00 0.00 Cancelado 2022-04-11 2022-05-31 2022-06-10 2022-06-20 2023-06-20 n priority biodiversity and ec rcha de centro regional de di osystem services areas álogo para la Orinoquía. CO-WWF-309149-CS-INDV / Landscape management for Realización de podcasts para connectivity and resilience i TF / B0740 Posterior Individual Open - National 9,000.00 0.00 Cancelado 2022-08-22 2022-09-14 2022-09-15 2022-09-19 2023-03-18 el proyecto GEF paisajes inte n priority biodiversity and ec grados sostenibles de la Orin osystem services areas oquía Project Management, Imple CO-WWF-309104-CS-INDV / TF / B0740 mentation, Coordination, Co Posterior Individual Direct - National 17,820.00 0.00 Firmado 2022-08-22 2022-08-22 2022-08-23 2022-08-22 2022-09-05 2022-09-05 2022-09-05 2022-09-05 2023-06-30 Apoyo de adqusiciones mmunication, Monitoring an d Evaluation CO-WWF-298671-CS-CQS / C Landscape management for onsultor individual en diseño connectivity and resilience i TF / B0740 Posterior Individual Open - National 12,300.00 0.00 Finalizado 2022-08-22 2022-08-22 2022-09-14 2022-10-18 2022-09-16 2022-10-12 2022-09-22 2022-10-27 2023-05-20 2023-06-15 gráfico del proyecto GEF pais n priority biodiversity and ec ajes integrados sostenibles d osystem services areas e la Orinoquía CO-WWF-309110-CS-CDS / A Project Management, Imple sesor Experto en adqusicione TF / B0740 mentation, Coordination, Co Posterior Individual Direct - National 12,000.00 9,761.82 Finalizado 2022-08-22 2022-08-22 2022-08-27 2022-08-22 2022-09-05 2022-08-24 2022-09-05 2022-09-18 2023-06-30 2023-06-15 s mmunication, Monitoring an d Evaluation CO-WWF-310259-CS-INDV / Facilitación gráfica en el proc eso de identificación de actor Effective integration of envir es e instancias clave, diseño onmental considerations at a e implementación de la ruta TF / B0740 Posterior Individual Open - National 16,866.00 0.00 Finalizado 2022-08-22 2022-08-22 2022-09-15 2022-10-12 2022-09-19 2022-10-06 2022-09-24 2022-10-14 2023-06-30 2023-11-30 ppropriate scales in territoria de aproximación específica c l and sector planning on partes interesadas (autori dades, comunidades, sectore s) aportando claridad y herra mientas de comunicación CO-WWF-310260-CS-INDV / Gestor indígena para la identi ficación de actores e instanci Effective integration of envir as clave, diseño e implement onmental considerations at a ación de la ruta de aproxima TF / B0740 Posterior Individual Open - National 7,955.00 0.00 Finalizado 2022-08-22 2022-08-22 2022-09-15 2022-09-26 2022-09-19 2022-09-29 2022-09-24 2022-10-05 2023-03-23 2023-05-31 ppropriate scales in territoria ción específica con partes int l and sector planning eresadas (autoridades, comu nidades, sectores) garantizan do el diálogo y la construcció n participativa CO-WWF-310255-CS-INDV / Consultor profesional 1 para Effective integration of envir el desarrollo de actividades e onmental considerations at a n campo para la implementa TF / B0740 Posterior Individual Open - National 7,558.00 0.00 Finalizado 2022-08-26 2022-09-06 2022-09-19 2022-11-04 2022-09-22 2022-10-21 2022-09-26 2022-12-01 2023-03-25 2023-05-31 ppropriate scales in territoria ción de los protocolos de mo l and sector planning nitoreo de ungulados, tortug as y otras especies en el PNN Tuparro. Page 8 CO-WWF-310252-CS-INDV / Consultor profesional 2 para Effective integration of envir el desarrollo de actividades e onmental considerations at a n campo para la implementa TF / B0740 Posterior Individual Open - National 7,558.00 0.00 Finalizado 2022-08-26 2022-09-06 2022-09-17 2022-11-04 2022-09-20 2022-10-21 2022-09-25 2022-11-21 2023-03-24 2023-05-20 ppropriate scales in territoria ción de los protocolos de mo l and sector planning nitoreo de ungulados, tortug as y otras especies en el PNN Tuparro. CO-WWF-310250-CS-INDV / Gestor local para la identifica ción de actores e instancias c Effective integration of envir lave, diseño e implementació onmental considerations at a TF / B0740 Posterior Individual Open - National 19,623.00 0.00 Finalizado 2022-08-22 2022-08-22 2022-09-15 2022-10-14 2022-09-17 2022-10-06 2022-09-23 2022-10-27 2023-06-30 2023-06-15 n de la ruta de aproximación ppropriate scales in territoria específica con partes interes l and sector planning adas (autoridades, comunida des, sectores) garantizando e l diálogo y la construcción pa rticipativa CO-WWF-309093-CS-INDV / Landscape management for Consultoría para la elaboraci connectivity and resilience i ón de bases de datos del sist TF / B0740 Posterior Individual Open - National 5,569.00 0.00 Finalizado 2022-08-29 2022-08-25 2022-09-26 2022-10-14 2022-09-27 2022-10-14 2022-10-03 2022-10-27 2023-04-01 2023-04-30 n priority biodiversity and ec ema de monitoreo del proyec osystem services areas to y gestión de archivo en lín ea. CO-WWF-293651-CS-INDV / Consultor operario 2 para el Effective integration of envir desarrollo de actividades en onmental considerations at a campo para la implementació TF / B0740 Posterior Individual Limited 2,387.00 0.00 Finalizado 2022-09-02 2022-09-06 2022-09-17 2022-11-15 2022-09-20 2022-11-30 2022-09-27 2022-12-09 2023-03-26 2023-06-11 ppropriate scales in territoria n de los protocolos de monito l and sector planning reo de ungulados, tortugas y otras especies en el PNN Tup arro. CO-WWF-293649-CS-INDV / Consultor operario 1 para el Effective integration of envir desarrollo de actividades en onmental considerations at a campo para la implementació TF / B0740 Posterior Individual Limited 2,387.00 0.00 Finalizado 2022-09-02 2022-09-06 2022-09-17 2022-11-30 2022-09-20 2022-12-01 2022-09-25 2022-12-09 2023-03-24 2023-06-11 ppropriate scales in territoria n de los protocolos de monito l and sector planning reo de ungulados, tortugas y otras especies en el PNN Tup arro. CO-WWF-320697-CS-INDV / Landscape management for Consultoría individual para lle connectivity and resilience i TF / B0740 Posterior Individual Limited 26,500.00 0.00 Finalizado 2022-10-28 2022-10-26 2022-11-12 2022-11-18 2022-11-17 2022-11-18 2022-11-21 2022-12-09 2023-02-19 2023-04-15 var a cabo la revisión de med n priority biodiversity and ec io término del proyecto osystem services areas CO-WWF-310254-CS-INDV / Landscape management for Avalúo y preparación de doc connectivity and resilience i TF / B0740 Posterior Individual Open - National 2,000.00 0.00 Cancelado 2022-09-02 2022-09-26 2022-09-29 2022-10-05 2022-12-04 umentación necesaria para la n priority biodiversity and ec adquisición de sede para DN osystem services areas MI Cinaruco CO-WWF-310253-CS-INDV / Elaboración de línea base en Landscape management for género, análisis de vulnerabil connectivity and resilience i TF / B0740 Posterior Individual Open - National 14,320.00 0.00 Cancelado 2022-08-22 2022-08-22 2022-09-13 2022-10-27 2022-09-16 2022-09-20 2023-03-19 idad de actores y estrategia n priority biodiversity and ec para la transversalización del osystem services areas enfoque de género en el proy ecto. CO-WWF-320698-CS-INDV / Liderar la generación de herr amientas para la integración Effective integration of envir efectiva de las consideracion onmental considerations at a es ambientales y escalas apr TF / B0740 Posterior Individual Direct - National 33,503.00 0.00 Firmado 2022-10-31 2022-11-07 2022-11-06 2022-11-11 2022-11-09 2022-11-15 2022-11-13 2023-03-16 2023-06-23 ppropriate scales in territoria opiadas en la planeación terri l and sector planning torial y sectorial basadas en l a identificación de la Estructu ra Ecológica Principal (EEP) y la determinación CO-WWF-324425-CS-INDV / Elaboración de línea base en Landscape management for género, análisis de vulnerabil connectivity and resilience i TF / B0740 Posterior Individual Open - National 14,320.00 0.00 Finalizado 2022-11-15 2022-11-09 2022-12-10 2023-02-03 2022-12-13 2023-02-03 2022-12-18 2023-02-16 2023-06-30 2023-06-30 idad de actores y estrategia n priority biodiversity and ec para la transversalización del osystem services areas enfoque de género en el proy ecto. CO-WWF-310258-CS-INDV / Landscape management for Diagnóstico de conflicto socia connectivity and resilience i l y ambiental y caracterizació TF / B0740 Posterior Individual Open - National 10,753.00 0.00 Cancelado 2022-08-26 2022-09-19 2022-09-23 2022-09-28 2023-06-30 n priority biodiversity and ec n de actores e intereses com osystem services areas o insumo para la consolidació n del centro regional CO-WWF-332963-CS-INDV / Coordinar la ejecución del Pr oyecto GEF 6 “Paisajes Integr Effective integration of envir ados Sostenibles de la Orinoq onmental considerations at a TF / B0740 Posterior Individual Limited 20,533.00 0.00 Finalizado 2022-12-30 2023-01-27 2023-01-04 2023-02-15 2023-01-25 2023-02-22 2023-03-01 2023-03-14 2023-06-30 2023-06-15 uia”, supervisar y asegurar la ppropriate scales in territoria integralidad de los aspectos t l and sector planning écnicos, legales, administrati vos, operativos y logísticos d el mismo, garantizando que s e cumplan CO-WWF-310257-CS-INDV / Preparación, consulta e imple mentación de un Marco de G Landscape management for estión Ambiental y Social (M connectivity and resilience i GAS) para las actividades pre TF / B0740 Posterior Individual Open - National 21,838.00 0.00 Cancelado 2022-12-05 2022-12-27 2022-12-31 2023-01-04 2023-06-30 n priority biodiversity and ec vistas bajo 2.1.5 y 2.2. hacie osystem services areas ndo especial enfasis en Plan de gestion ambiental a todas los obras de infraestructura, Programa Manejo Integrado CO-WWF-343431-CS-INDV / Landscape management for Consultor individual para la e connectivity and resilience i laboración del programa de TF / B0740 Posterior Individual Open - National 4,107.00 0.00 Cancelado 2023-04-20 2023-05-12 2023-05-14 2023-06-06 2023-06-29 n priority biodiversity and ec manejo integrado de plagas osystem services areas y uso de agroquímicos del pr oyecto CO-WWF-343438-CS-INDV / Landscape management for Consultor individual para la e connectivity and resilience i TF / B0740 Posterior Individual Open - National 4,107.00 0.00 Cancelado 2023-04-20 2023-05-12 2023-05-14 2023-05-18 2023-06-30 laboración del plan de manej n priority biodiversity and ec o sostenible de especies/pobl osystem services areas aciones silvestres. CO-WWF-342865-CS-INDV / Landscape management for Consultor individual para la e connectivity and resilience i TF / B0740 Posterior Individual Open - National 4,107.00 0.00 Cancelado 2023-05-20 2023-06-11 2023-06-13 2023-06-17 2023-06-30 laboración del plan de gestió n priority biodiversity and ec n de la salud y la seguridad d osystem services areas e la comunidad CO-WWF-343449-CS-INDV / Project Management, Imple Apoyo de archivo adquisicion TF / B0740 mentation, Coordination, Co Posterior Individual Open - National 3,582.00 0.00 Firmado 2023-02-20 2023-02-13 2023-03-14 2023-03-31 2023-03-17 2023-03-31 2023-03-21 2023-04-10 2023-06-30 es mmunication, Monitoring an d Evaluation Page 9 CO-WWF-343195-CS-INDV / Consultoría individual para la Effective integration of envir gobernanza territorial alrede onmental considerations at a dor del agua y articulación de TF / B0740 Posterior Individual Limited 9,126.00 0.00 Cancelado 2023-04-20 2023-05-04 2023-05-12 2023-05-16 2023-06-30 ppropriate scales in territoria los procesos de zonificación a l and sector planning mbiental, POTs y agricultura, con base en Minambiente y e n articulación con la UIP CO-WWF-342864-CS-INDV / Consultoría individual para la Effective integration of envir articulación de componentes onmental considerations at a TF / B0740 Posterior Individual Limited 9,126.00 0.00 Cancelado 2023-03-27 2023-04-10 2023-04-14 2023-04-20 2023-06-30 técnicos del proyecto entre la ppropriate scales in territoria s distintas dependencias del l and sector planning Minambiente que participan en el proyecto CO-WWF-343443-CS-INDV / Effective integration of envir Consultoría para apoyar el pr onmental considerations at a TF / B0740 Posterior Individual Limited 2,396.00 0.00 Cancelado 2023-04-17 2023-05-01 2023-05-06 2023-05-28 2023-06-30 oceso de fortalecimiento de c ppropriate scales in territoria apacidad de los periodistas a l and sector planning mbientales CO-WWF-342867-CS-INDV / Landscape management for Consutor 1. Diseño e implem connectivity and resilience i entación de estrategia de soc TF / B0740 Posterior Individual Limited 5,476.00 0.00 Finalizado 2023-03-01 2023-02-13 2023-03-15 2023-03-15 2023-03-18 2023-03-16 2023-03-22 2023-03-29 2023-06-30 2023-06-15 n priority biodiversity and ec ialización y convocatoria (par osystem services areas a nuevas RNSC), consultor a mbiental CO-WWF-329046-CS-INDV / Asegurar la coordinación e in tegralidad de los aspectos ge Landscape management for renciales, administrativos, té connectivity and resilience i cnicos, logísticos y legales qu TF / B0740 Posterior Individual Limited 20,534.00 0.00 Cancelado 2022-12-12 2022-12-27 2022-12-30 2023-01-03 2023-06-30 n priority biodiversity and ec e se requieran para la ejecuci osystem services areas ón del Proyecto, así como fo mentar con otras iniciativas c lave en territorio y hacer seg uimiento a la ejec CO-WWF-308856-CS-INDV / Effective integration of envir Levantar línea base de capac onmental considerations at a idades y apoyar el diseño e i TF / B0740 Posterior Individual Open - National 14,000.00 0.00 Cancelado 2023-03-15 2023-04-09 2023-04-10 2023-04-11 2023-06-30 ppropriate scales in territoria mplementación de la estrate l and sector planning gia de capacidades del proye cto. CO-WWF-343434-CS-INDV / Landscape management for Consultor individual para la e connectivity and resilience i TF / B0740 Posterior Individual Open - National 4,107.00 0.00 Cancelado 2023-05-20 2023-06-11 2023-06-13 2023-06-16 2023-06-30 laboración del plan de gestió n priority biodiversity and ec n ambiental obras de infraest osystem services areas ructura CO-WWF-344590-CS-INDV / Effective integration of envir Levantar línea base de capac onmental considerations at a idades y apoyar el diseño e i TF / B0740 Posterior Individual Limited 6,160.00 0.00 Cancelado 2023-03-10 2023-03-24 2023-03-29 2023-04-02 2023-06-30 ppropriate scales in territoria mplementación de la estrate l and sector planning gia de capacidades del proye cto. CO-WWF-352132-CS-INDV / Effective integration of envir Levantar línea base de capac onmental considerations at a idades y apoyar el diseño e i TF / B0740 Posterior Individual Limited 14,000.00 0.00 Finalizado 2023-03-23 2023-06-20 2023-04-06 2023-06-02 2023-04-13 2023-06-22 2023-04-16 2023-07-01 2023-06-29 2023-12-30 ppropriate scales in territoria mplementación de la estrate l and sector planning gia de capacidades del proye cto. Landscape management for CO-WWF-358787-CS-INDV / connectivity and resilience i Especialista en Gestion Social TF / B0740 Posterior Individual Limited 2,522.00 0.00 Firmado 2023-04-27 2023-06-15 2023-05-07 2023-05-02 2023-05-10 2023-06-21 2023-05-16 2023-06-26 2023-06-15 n priority biodiversity and ec /Estandares Sociales osystem services areas CO-WWF-343193-CS-INDV / Consultoría para el desarrollo Landscape management for e implementación de al meno connectivity and resilience i s 3 procesos de ordenamient TF / B0740 Posterior Individual Limited 16,427.00 0.00 Cancelado 2023-03-15 2023-03-29 2023-04-03 2023-04-08 2023-06-30 n priority biodiversity and ec o pesquero que contengan li osystem services areas neamientos técnicos de man ejo para recursos hidrobiológi cos en la cuenca del río Bita CO-WWF-368243-CS-INDV / Contratación de un asesor ex perto en adquisiciones bajo l Landscape management for as Regulaciones del Banco M connectivity and resilience i TF / B0740 Posterior Individual Direct - National 6,812.00 0.00 Firmado 2023-07-04 2023-06-30 2023-07-07 2023-06-30 2023-07-09 2023-06-30 2023-07-11 2023-07-04 2024-01-07 undial con el fin de fortalecer n priority biodiversity and ec la capacidad del Proyecto en osystem services areas adquisiciones y apoyar la agil ización de la ejecución del Pl an de Adquisiciones CO-WWF-368352-CS-INDV / Liderar la implementación de Landscape management for las acciones relacionadas con connectivity and resilience i TF / B0740 Posterior Individual Direct - National 32,295.00 0.00 Firmado 2023-07-04 2023-06-30 2023-07-05 2023-06-30 2023-07-07 2023-06-30 2023-07-09 2023-07-04 2024-07-03 paisajes y sistemas productiv n priority biodiversity and ec os sostenibles contempladas osystem services areas por el proyecto, en las áreas de intervención del mismo. CO-WWF-368346-CS-INDV / Orientar técnicamente y lider ar el desarrollo de las activid Landscape management for ades del proyecto Paisajes In connectivity and resilience i TF / B0740 Posterior Individual Direct - National 22,403.00 0.00 Firmado 2023-07-04 2023-06-30 2023-07-05 2023-06-30 2023-07-07 2023-06-30 2023-07-09 2023-07-04 2024-07-03 tegrados Sostenibles de la Or n priority biodiversity and ec inoquía (P167830) relacionad osystem services areas as con ecosistemas estratégi cos en el área de jurisdicción de Corporinoquia CO-WWF-368347-CS-INDV / Coordinar la ejecución del Pr oyecto GEF 6 “Paisajes Integr Landscape management for ados Sostenibles de la Orinoq connectivity and resilience i TF / B0740 Posterior Individual Direct - National 41,265.00 0.00 Firmado 2023-07-04 2023-06-30 2023-07-05 2023-06-30 2023-07-07 2023-06-30 2023-07-09 2023-07-04 2024-07-03 uia”, supervisar y asegurar la n priority biodiversity and ec integralidad de los aspectos t osystem services areas écnicos, legales, administrati vos, operativos y logísticos d el mismo CO-WWF-368348-CS-INDV / Recopilar y administrar los d atos e información necesaria Landscape management for s que permitan verificar perió connectivity and resilience i dicamente los avances y cum TF / B0740 Posterior Individual Direct - National 40,241.00 0.00 Firmado 2023-07-04 2023-06-30 2023-07-05 2023-06-30 2023-07-07 2023-06-30 2023-07-09 2023-07-04 2024-07-03 n priority biodiversity and ec plimiento de las actividades, i osystem services areas ndicadores, objetivos y ejecu ción de los componentes del Proyectoe identificar oportuni dades para la mejora co Page 10 CO-WWF-368354-CS-INDV / Enlace con las comunidades organizaciones locales para l Landscape management for a implementación del Proyec connectivity and resilience i to, aportar insumos para imp TF / B0740 Posterior Individual Direct - National 18,445.00 0.00 Rescindido 2023-07-04 2023-06-30 2023-07-05 2023-06-30 2023-07-07 2023-06-30 2023-07-09 2023-07-04 2024-07-03 n priority biodiversity and ec lementación del (PPPI) la estr osystem services areas ategia de FC y la estrategia d e comunicaciones del Proyect o, de acuerdo a los (EAS) del (EAS 7 y 10) CO-WWF-368313-CS-INDV / Apoyar implementación del p rograma de monitoreo y del Effective integration of envir portafolio proyectos de inves onmental considerations at a tigación del Distrito Nacional TF / B0740 Posterior Individual Direct - National 18,668.00 0.00 Firmado 2023-07-04 2023-06-30 2023-07-05 2023-06-30 2023-07-07 2023-06-30 2023-07-09 2023-07-04 2024-07-03 ppropriate scales in territoria de Manejo Integrado Cinaruc l and sector planning o y aportar al conocimiento d e sus valores objeto de conse rvación con los lineamientos i nstitucionales de PNN CO-WWF-368355-CS-INDV / Coordinar la implementación del programa de monitoreo y Effective integration of envir del portafolio de proyectos d onmental considerations at a e investigación para la toma TF / B0740 Posterior Individual Direct - National 18,030.00 0.00 Firmado 2023-07-04 2023-06-30 2023-07-05 2023-06-30 2023-07-07 2023-06-30 2023-07-09 2023-07-04 2024-07-03 ppropriate scales in territoria de decisiones en el Parque N l and sector planning acional Natural El Tuparro, de acuerdo plan de trabajo de e stos programas y a los linea mientos de PNN CO-WWF-368353-CS-INDV / Apoyar operativa y logística mente el desarrollo de activi Effective integration of envir dades en campo planificadas onmental considerations at a TF / B0740 Posterior Individual Direct - National 4,720.00 0.00 Firmado 2023-07-04 2023-06-30 2023-07-05 2023-06-30 2023-07-07 2023-06-30 2023-07-09 2023-07-04 2024-07-03 para la implementación de lo ppropriate scales in territoria s protocolos establecidos en l and sector planning el programa de monitoreo y el portafolio de proyectos de investigación del PNN El Tupa rro CO-WWF-368305-CS-INDV / Apoyar la implementación de la hoja de ruta para el registr Landscape management for o de Reservas Naturales de l connectivity and resilience i a Sociedad Civil en la Orinoq TF / B0740 Posterior Individual Direct - National 15,406.00 0.00 Firmado 2023-07-04 2023-06-30 2023-07-05 2023-06-30 2023-07-07 2023-06-30 2023-07-09 2023-07-04 2024-07-03 n priority biodiversity and ec uia en los mosaicos priorizad osystem services areas os por el proyecto GEF Orino quia, en el Sistemas de Infor mación Geográfica -SIG y car tografía asociada. CO-WWF-368357-CS-INDV / Apoyar al PNN Tuparro en so cialización e implementación Landscape management for de su plan de manejo a travé connectivity and resilience i s de la orientación técnica en TF / B0740 Posterior Individual Direct - National 16,693.00 0.00 Firmado 2023-07-04 2023-06-30 2023-07-05 2023-07-01 2023-07-07 2023-06-30 2023-07-09 2023-07-04 2024-07-03 n priority biodiversity and ec los procesos de gobernanza y osystem services areas relacionamiento con actores estratégicos nivel local y regi onal, incluyendo los diálogos con los PI CO-WWF-368344-CS-INDV / Apoyar implementación de l a hoja de ruta para el registr Landscape management for o de Reservas Naturales de l connectivity and resilience i TF / B0740 Posterior Individual Direct - National 15,406.00 0.00 Firmado 2023-07-04 2023-06-30 2023-07-05 2023-06-30 2023-07-07 2023-06-30 2023-07-09 2023-07-04 2024-07-03 a Sociedad Civil en la Orinoq n priority biodiversity and ec uia, con énfasis en los mosai osystem services areas cos priorizados por el proyect o GEF Orinoquia y los lineami entos institucionales de PNN CO-WWF-368358-CS-INDV / Liderar la implementación de Landscape management for la estrategia de comunicacio connectivity and resilience i nes del Proyecto GEF Paisaje TF / B0740 Posterior Individual Direct - National 25,763.00 0.00 Firmado 2023-07-04 2023-06-30 2023-07-05 2023-06-30 2023-07-07 2023-06-30 2023-07-09 2023-07-04 2024-07-03 n priority biodiversity and ec s Integrados Sostenibles de l osystem services areas a Orinoquia – GEF Orinoquia en articulación con la UIP y lo s socios del Proyecto. CO-WWF-368299-CS-INDV / Potenciar el posicionamiento y la divulgación de las accion Landscape management for es del Proyecto GEF, y contr connectivity and resilience i ibuir a su implementación, po TF / B0740 Posterior Individual Direct - National 17,875.00 0.00 Firmado 2023-07-04 2023-06-30 2023-07-05 2023-06-30 2023-07-07 2023-06-30 2023-07-09 2023-07-04 2024-07-03 n priority biodiversity and ec r medio de la creación oportu osystem services areas na de su logo su manual de marca lineamientos de image n y el servicio de diseño para de piezas gráficas CO-WWF-368309-CS-INDV / Orientar técnicamente y lider Landscape management for ar el desarrollo de las activid connectivity and resilience i TF / B0740 Posterior Individual Direct - National 25,002.00 0.00 Firmado 2023-07-04 2023-06-30 2023-07-05 2023-07-30 2023-07-07 2023-06-30 2023-07-09 2023-07-04 2024-07-03 ades relacionadas con áreas n priority biodiversity and ec protegidas para la implement osystem services areas ación del Proyecto GEF Orino quia. CO-WWF-368359-CS-INDV / Elaborar bases de datos que alimenten el sistema de moni Landscape management for toreo del Proyecto, apoyar en connectivity and resilience i el diseño de talleres para la s TF / B0740 Posterior Individual Direct - National 11,265.00 0.00 Firmado 2023-07-04 2023-06-30 2023-07-05 2023-06-30 2023-07-07 2023-06-30 2023-07-09 2023-07-04 2024-07-03 n priority biodiversity and ec istematización de informació osystem services areas n y/o hallazgos y gestionar el archivo en línea y elaborar fo rmularios en la herramienta Kobo Toolbox. CO-WWF-369957-CS-INDV / Apoyar técnicamente a la Dir ección de Ordenamiento Amb Effective integration of envir iental Territorial de MinAmbie onmental considerations at a nte en el dise-ño participativ TF / B0740 Posterior Individual Open - National 22,008.00 0.00 Firmado 2023-07-07 2023-06-30 2023-07-29 2023-08-04 2023-07-31 2023-09-29 2023-08-04 2023-09-30 2024-08-03 ppropriate scales in territoria o y puesta en marcha de la r l and sector planning uta de implementación del “P rograma territorial de orde-n amiento y gobernanza alrede dor del agua” priorizado para CO-WWF-369964-CS-INDV / Apoyar a la Dirección de Bos ques, Biodiversidad y Servici Landscape management for os Ecosistémicos (DBBSE) del connectivity and resilience i Ministerio de Ambiente y Des TF / B0740 Posterior Individual Limited 22,008.00 0.00 Firmado 2023-07-07 2023-06-30 2023-07-21 2023-09-06 2023-07-26 2023-11-02 2023-08-01 2023-11-03 2024-07-31 n priority biodiversity and ec arrollo Sostenible, ejerciendo osystem services areas el rol de enlace y articulación entre las distintas depen-den cias del MinAmbiente con la UIP y los socios del Page 11 CO-WWF-369968-CS-INDV / Desarrollar lineamientos técn icos de manejo para el recurs Effective integration of envir o pesquero en el mosaico Ra onmental considerations at a msar Bita – RB e implementa TF / B0740 Posterior Individual Open - National 22,008.00 0.00 Firmado 2023-07-07 2023-06-30 2023-07-29 2023-08-14 2023-07-31 2023-09-08 2023-08-23 2023-09-19 2024-08-22 ppropriate scales in territoria r acciones para el ordenamie l and sector planning nto en la pesca de consumo f amiliar y comercial, pesca or namental y deportiva con co nsideraciones de biodiversida d CO-WWF-376673-CS-INDV / Effective integration of envir Operario para la implementa onmental considerations at a TF / B0740 Posterior Individual Limited 5,279.00 0.00 Firmado 2023-09-01 2023-08-23 2023-09-16 2023-09-01 2023-09-18 2023-10-30 2023-09-22 2023-11-01 2024-09-21 ción de las líneas de monitor ppropriate scales in territoria eo e investigación en el DNMI l and sector planning Cinaruco CO-WWF-376686-CS-INDV / Landscape management for Consultor profesional para la connectivity and resilience i TF / B0740 Posterior Individual Limited 18,462.00 0.00 Firmado 2023-09-01 2023-08-23 2023-09-16 2023-09-01 2023-09-18 2023-10-17 2023-09-22 2023-10-20 2024-09-21 Caracterización de los sistem n priority biodiversity and ec as de producción de DNMI Ci osystem services areas naruco CO-WWF-376688-CS-INDV / Landscape management for Consultor técnico para la Car connectivity and resilience i TF / B0740 Posterior Individual Limited 12,308.00 0.00 Firmado 2023-09-01 2023-08-23 2023-09-16 2023-09-01 2023-09-18 2023-10-27 2023-09-22 2023-11-01 2024-09-21 acterización de los sistemas n priority biodiversity and ec de producción de DNMI Cinar osystem services areas uco CO-WWF-376690-CS-INDV / Landscape management for Apoyo al proceso de goberna connectivity and resilience i nza al desarrollo de la ruta d TF / B0740 Posterior Individual Limited 5,279.00 0.00 Firmado 2023-09-01 2023-08-24 2023-09-16 2023-09-14 2023-09-18 2023-11-01 2023-09-22 2023-11-08 2024-09-21 n priority biodiversity and ec e declaratoria del área nacio osystem services areas nal Sabanas y humedales de Arauca CO-WWF-376676-CS-INDV / Consultor individual experto Landscape management for en estándares ambientales y connectivity and resilience i sociales como enlace técnico TF / B0740 Posterior Individual Open - National 24,615.00 0.00 Firmado 2023-09-01 2023-08-23 2023-09-27 2023-11-01 2023-09-29 2023-11-30 2023-10-03 2023-12-01 2024-10-02 n priority biodiversity and ec en la Subdirección de Educac osystem services areas ión y Participación del MinAm biente, con base en MinAmbi ente y en articulación con la UIP. CO-WWF-376680-CS-INDV / Actualizar, completar y entre gar conforme el manual oper Project Management, Imple ativo del proyecto y las políti mentation, Coordination, Co cas de archivo de WWF Colo TF / B0740 Posterior Individual Open - National 12,308.00 0.00 Firmado 2023-09-01 2023-09-05 2023-09-25 2023-10-19 2023-09-27 2023-10-24 2023-10-01 2023-11-01 2024-09-30 mmunication, Monitoring an mbia la documentación de la d Evaluation s contrataciones y los proces os de adquisiciones del proye cto GEF Paisajes Integrados S ostenibles de la Orinoquia. CO-WWF-376679-CS-INDV / Liderar la socialización, ajust e, implementación y seguimi Landscape management for ento al Plan de Acción de Gé connectivity and resilience i nero del proyecto Paisajes Int TF / B0740 Posterior Individual Direct - National 27,692.00 0.00 Firmado 2023-09-04 2023-09-04 2023-09-21 2023-09-15 2023-09-23 2023-09-22 2023-09-27 2023-09-25 2024-08-22 n priority biodiversity and ec egrados Sostenibles de la Ori osystem services areas noquía, con el fin de asegura r su cumplimiento en la incor poración del enfoque de gén ero de manera directa y CO-WWF-376681-CS-INDV / Apoyar a la Especialista de A dquisiciones del proyecto en l Project Management, Imple a realización de los procesos mentation, Coordination, Co de adquisiciones del proyecto TF / B0740 Posterior Individual Direct - National 19,902.00 0.00 Firmado 2023-09-04 2023-09-04 2023-09-22 2023-09-15 2023-09-24 2023-10-01 2023-09-28 2023-10-02 2024-09-27 mmunication, Monitoring an GEF Paisajes Integrados Sost d Evaluation enibles de la Orinoquia, tenie ndo en cuenta lo establecido en el Acuerdo Legal de Dona ción, en el MOP. CO-WWF-376677-CS-INDV / Orientar políticamente las act ividades que el proyecto des Landscape management for arrolla con comunidades indí connectivity and resilience i genas, de manera que estas f TF / B0740 Posterior Individual Direct - National 11,282.00 0.00 Firmado 2023-09-08 2023-09-11 2023-09-25 2023-09-15 2023-09-27 2023-09-27 2023-10-01 2023-09-28 2024-08-26 n priority biodiversity and ec ortalezcan la gobernanza de l osystem services areas os territorios ancestrales. Ap ortar insumos para la implem entación del enfoque diferen cial para pueblos indígena CO-WWF-383259-CS-INDV / Formular participativamente con los entes territoriales pre Landscape management for sentes en los mosaicos del pr connectivity and resilience i oyecto GEF Orinoquia y acom TF / B0740 Posterior Individual Open - National 30,796.00 0.00 Firmado 2023-10-06 2023-10-17 2023-10-28 2023-11-22 2023-10-31 2023-12-15 2023-11-04 2023-12-18 2024-11-03 n priority biodiversity and ec pañar la gestión de 2 proyect osystem services areas os al sistema general de rega lías o a otras fuentes de finan ciamiento para apoyar la imp lementación de estrateg CO-WWF-323898-CS-INDV / Coordinar la consolidación e i mplementación del Centro R Landscape management for egional de Diálogo Ambiental connectivity and resilience i de la Orinoquía (CRDAO), co TF / B0740 Posterior Individual Open - National 11,163.00 0.00 Cancelado 2023-03-27 2023-04-18 2023-04-20 2023-04-24 2023-06-30 n priority biodiversity and ec mo plataforma de participaci osystem services areas ón regional para la construcci ón de alternativas dirigidas h acia la prevención y transfor mación positiva CO-WWF-343454-CS-INDV / Formulación de 2 proyectos q ue promueven la sostenibilid Landscape management for ad en Orinoquia a través de l connectivity and resilience i TF / B0740 Posterior Individual Limited 4,928.00 0.00 Cancelado 2023-05-15 2023-05-29 2023-06-03 2023-06-07 2023-06-30 a financiación de iniciativas d n priority biodiversity and ec e conservación - producción osystem services areas y presentación de los mismos al sistema de regalías o a otr os mecanismos de financiami ento. CO-WWF-343456-CS-INDV / Consultor individual para la a ctualización del Marco de Pro Landscape management for ceso para la prevención o mit connectivity and resilience i TF / B0740 Posterior Individual Open - National 4,563.00 0.00 Cancelado 2023-04-20 2023-05-15 2023-05-18 2023-05-21 2023-06-30 igación de restricciones en lo n priority biodiversity and ec s usos de la tierra o en el acc osystem services areas eso a recursos naturales por l a declaración de áreas prote gidas (MP) Page 12 CO-WWF-323895-CS-INDV / Prestar servicios profesionale s desde el ámbito ambiental Landscape management for para la caracterización y anál connectivity and resilience i TF / B0740 Posterior Individual Open - National 9,767.00 0.00 Cancelado 2023-03-27 2023-04-17 2023-04-20 2023-04-26 2023-06-30 isis de los conflictos socioam n priority biodiversity and ec bientales, que contribuya a la osystem services areas Implementación del Centro R egional de Diálogo Ambiental de la Orinoquía (CRDAO). CO-WWF-310256-CS-INDV / Consultoría para el mapeo de acciones de restauración en Landscape management for el territorio y municipios PDE connectivity and resilience i T, selección del área a resta TF / B0740 Posterior Individual Open - National 34,839.00 0.00 Cancelado 2022-12-02 2023-02-15 2022-12-26 2022-12-30 2023-01-04 2023-06-29 n priority biodiversity and ec urar, identificación de actore osystem services areas s clave y firma de acuerdos c on asociaciones de base para la implementación de accion es de restauración de CO-WWF-323894-CS-INDV / Prestar servicios profesionale s desde el ámbito social para Landscape management for la caracterización y análisis d connectivity and resilience i TF / B0740 Posterior Individual Open - National 9,767.00 0.00 Cancelado 2023-03-27 2023-04-22 2023-04-24 2023-04-28 2023-06-30 e los conflictos socioambient n priority biodiversity and ec ales, que contribuya a la Impl osystem services areas ementación del Centro Regio nal de Diálogo Ambiental de l a Orinoquía (CRDAO) CO-WWF-342832-CS-INDV / Elaboración de un portafolio r Landscape management for egional (por mocaicos) de pr connectivity and resilience i oductos priorizados de la bio TF / B0740 Posterior Individual Open - National 6,160.00 0.00 Cancelado 2023-03-24 2023-04-17 2023-04-22 2023-04-27 2023-06-30 n priority biodiversity and ec economía con un component osystem services areas e de innovación, ciencia y tec nología y con potencial de es calamiento comercial. CO-WWF-343194-CS-INDV / Consultor individual experto Landscape management for en estándares ambientales y connectivity and resilience i sociales como enlace técnico TF / B0740 Posterior Individual Limited 9,126.00 0.00 Cancelado 2023-05-29 2023-05-31 2023-06-01 2023-06-02 2023-06-30 n priority biodiversity and ec en la Subdirección de Educac osystem services areas ión y Participación del MinAm biente, con base en MinAmbi ente y en articulación con la UIP. CO-WWF-376693-CS-INDV / Consultor 2. Consultoría para acompañar a la AUNAP en la i Effective integration of envir dentificación y estructuración onmental considerations at a TF / B0740 Posterior Individual Open - National 24,615.00 0.00 Cancelado 2023-09-20 2023-10-15 2023-10-17 2023-10-21 2024-10-20 de alternativas sostenibles p ppropriate scales in territoria ara tiempos de veda (articula l and sector planning rse con el consultor de apropi ación de procesos de ordena miento pesquero) CO-WWF-394993-CS-INDV / Preparar e implementar herr amientas visuales, facilitació Landscape management for n gráfica, así como otras herr connectivity and resilience i amientas que faciliten el diál TF / B0740 Posterior Individual Direct - National 24,615.00 0.00 Firmado 2023-12-08 2023-12-07 2023-12-27 2023-12-07 2023-12-29 2023-12-14 2024-01-02 2023-12-15 2025-01-01 n priority biodiversity and ec ogo social y la participación d osystem services areas e actores, de manera transve rsal a los diferentes compone ntes técnicos en el marco de la implementación de CO-WWF-383262-CS-INDV / Consultor 2 acompañar y apo yar los procesos de gestión, s Landscape management for eguimiento y monitoreo de lo connectivity and resilience i s acuerdos voluntarios para r TF / B0740 Posterior Individual Open - National 18,462.00 0.00 Firmado 2023-12-15 2023-12-13 2024-01-08 2024-02-02 2024-01-10 2024-02-29 2024-01-14 2024-03-05 2025-01-13 n priority biodiversity and ec estauración y conectividad d osystem services areas e las áreas del proyecto en el mosaico Piedemonte-Cocuy- Cinaruco departamentos de Arauca-Casanare y facilite la a CO-WWF-383261-CS-INDV / Consultor 1 acompañar y apo yar los procesos de gestión, s Landscape management for eguimiento y monitoreo de lo connectivity and resilience i s acuerdos voluntarios para r TF / B0740 Posterior Individual Open - National 18,462.00 0.00 Firmado 2023-12-22 2023-12-13 2024-01-15 2024-01-19 2024-01-20 2024-02-05 2024-01-24 2024-02-08 2025-01-23 n priority biodiversity and ec estauración y conectividad d osystem services areas e las áreas del proyecto en el mosaico Piedemonte-Cocuy- Cinaruco departamentos de Arauca-Casanare CO-WWF-404850-CS-INDV / Effective integration of envir Técnico de apoyo SIG para su onmental considerations at a TF / B0740 Posterior Individual Open - National 18,461.54 0.00 Cancelado 2024-07-15 2024-04-25 2024-08-08 2024-07-15 2024-08-10 2024-07-17 2024-08-14 2025-08-14 bir al sistema la información ppropriate scales in territoria espacial l and sector planning CO-WWF-404865-CS-INDV / Landscape management for Apoyar las acciones requerid connectivity and resilience i TF / B0740 Posterior Individual Open - National 17,230.77 0.00 Firmado 2024-02-02 2024-02-07 2024-02-25 2024-04-03 2024-02-27 2024-04-10 2024-03-02 2024-04-15 2024-03-05 as para el registro de Reserv n priority biodiversity and ec as Naturales de la Sociedad osystem services areas Civil en la Orinoquia CO-WWF-404839-CS-INDV / Apoyar la gestión de la secre Landscape management for taría técnica del Sistema Reg connectivity and resilience i TF / B0740 Posterior Individual Open - National 15,384.62 0.00 Cancelado 2024-02-20 2024-01-31 2024-03-11 2024-03-11 2024-03-13 2024-04-01 2024-03-18 2025-03-18 ional de Áreas Protegidas de l n priority biodiversity and ec a Orinoquia para la ejecución osystem services areas del Plan Operativo Anual 202 4 CO-WWF-404843-CS-INDV / Apoyar a la SEP articipación Landscape management for de Minambiente, brindando o connectivity and resilience i rientación técnica para garan TF / B0740 Posterior Individual Open - National 24,615.38 0.00 Cancelado 2024-02-12 2024-03-01 2024-03-03 2024-03-07 2025-03-07 n priority biodiversity and ec tizar, en articulación con la E osystem services areas specialista Ambiental y Social /Estándares Sociales y Ambie ntales del proyecto GEF Orin oquía CO-WWF-410870-CS-CDS / D iseño e implementación del p Effective integration of envir rotocolo de gestión de inform onmental considerations at a Selección directa TF / B0740 Posterior Direct - National 60,256.41 0.00 Firmado 2024-03-01 2024-02-29 2024-04-22 2024-03-05 2024-05-17 2024-05-27 2025-01-12 ación interna para Corporino ppropriate scales in territoria de consultores quia, gestión de metadatos, c l and sector planning aptura, manejo e incorporaci ón de información al SIAC CO-WWF-410868-CS-INDV / Apoyar a la SEP articipación Landscape management for de Minambiente, brindando o connectivity and resilience i rientación técnica para garan TF / B0740 Posterior Individual Limited - National 24,615.38 0.00 Firmado 2024-03-04 2024-02-28 2024-03-27 2024-02-29 2024-04-03 2024-04-18 2024-04-10 2024-04-22 2025-04-10 n priority biodiversity and ec tizar, en articulación con la E osystem services areas specialista Ambiental y Social /Estándares Sociales y Ambie ntales del proyecto GEF Orin oquía Page 13 CO-WWF-376691-CS-INDV / Consultoría para mapeo acci ones de restauración en el te Landscape management for rritorio y municipios PDET del connectivity and resilience i área a restaurar identificació TF / B0740 Posterior Individual Open - National 27,692.00 0.00 Cancelado 2023-09-01 2023-09-06 2023-09-27 2023-12-01 2023-09-29 2023-10-03 2024-10-02 n priority biodiversity and ec n de actores clave firma de a osystem services areas cuerdos con asociaciones de base para la implementación de acciones de restauración de rondas de ríos CO-WWF-404846-CS-INDV / Consultoría para la generació Landscape management for n y mediación de contenidos connectivity and resilience i TF / B0740 Posterior Individual Open - National 26,153.85 0.00 Cancelado 2024-05-01 2024-05-24 2024-05-26 2024-05-30 2025-05-30 y módulos para los 5 planes n priority biodiversity and ec de fortalecimiento priorizado osystem services areas s e implementación de tallere s CO-WWF-421825-CS-INDV / Prestar servicios profesionale s con plena autonomía técnic Landscape management for a y administrativa para la ges connectivity and resilience i tión jurídica, trámite y ejecuc TF / B0740 Posterior Individual Open - National 10,811.00 0.00 Firmado 2024-05-06 2024-04-25 2024-06-01 2024-05-21 2024-06-03 2024-06-19 2024-06-12 2024-06-21 2025-02-07 n priority biodiversity and ec ión de la ruta de adquisición - osystem services areas compra de un predio urbano en el municipio de Cravo Nort e– departamento de Arauca, para la sede del Dist CO-WWF-421819-CS-CDS / C Project Management, Imple Selección directa ontratacion auditoria del proy TF / B0740 mentation, Coordination, Co Posterior Direct - National 23,648.00 0.00 Firmado 2024-04-22 2024-04-22 2024-05-03 2024-04-25 2024-05-09 2024-05-20 2025-06-30 de consultores ecto GEF Orinoquia 2023 -20 mmunication, Monitoring an 25 d Evaluation CO-WWF-423637-CS-CDS / I dentificar la Estructura Ecoló gica Principal (EEP) y definir l Effective integration of envir a Frontera Agrícola (FA) de lo onmental considerations at a Selección directa s municipios de Fortul, Puerto TF / B0740 Posterior Direct - National 108,108.00 0.00 Firmado 2024-05-02 2024-04-26 2024-06-04 2024-05-07 2024-06-15 2024-06-24 2025-01-11 ppropriate scales in territoria de consultores Rondón, Saravena y Tame y l l and sector planning as subzonas hidrográficas (S ZH) de los ríos Bojaba y Cova ría-Cubugón, como insumo p ara la integración y CO-WWF-435363-CS-INDV / Apoyar la gestión de la secre Landscape management for taría técnica del Sistema Reg connectivity and resilience i TF / B0740 Posterior Individual Open - National 15,385.00 0.00 Firmado 2024-02-20 2024-01-31 2024-03-11 2024-03-11 2024-03-13 2024-04-29 2024-03-18 2024-05-02 2025-03-18 ional de Áreas Protegidas de l n priority biodiversity and ec a Orinoquia para la ejecución osystem services areas del Plan Operativo Anual 202 4 CO-WWF-436630-CS-INDV / Realizar avalúo comercial del predio tipo urbano ubicado e Landscape management for n la calle 6 # 5 – 69 lote 01 b connectivity and resilience i TF / B0740 Posterior Individual Open - National 1,579.00 0.00 Firmado 2024-07-15 2024-07-09 2024-08-11 2024-09-24 2024-08-13 2024-10-01 2024-08-22 2024-10-01 2024-10-21 arrio Villa Llano, en el munici n priority biodiversity and ec pio de Cravo Norte– departa osystem services areas mento de Arauca, para la sed e del Distrito Nacional de Ma nejo Integrado Cinaruco. CO-WWF-436251-CS-CDS / P restar apoyo técnico a los pro cesos de gobernanza, diálogo Landscape management for y relacionamiento con actore connectivity and resilience i s estratégicos a nivel regiona TF / B0740 Posterior Individual Direct - National 16,097.00 0.00 Firmado 2024-07-15 2024-07-23 2024-07-26 2024-07-24 2024-07-28 2024-07-29 2024-08-01 2024-08-08 2025-03-29 n priority biodiversity and ec l y local, con énfasis en puebl osystem services areas os indígenas, comunidades lo cales y organizaciones de ba se comunitaria, así como, ac ompañar y orientar los CO-WWF-448225-CS-INDV / Apoyar la implementación de l Protocolo de gestión de info Effective integration of envir rmación interna formulado p onmental considerations at a ara Corporinoquia, gestión de TF / B0740 Posterior Individual Limited - National 9,231.00 0.00 En ejecución 2024-09-10 2024-09-24 2024-09-15 2024-09-30 2024-09-20 2024-09-24 2025-03-23 ppropriate scales in territoria metadatos e incorporación y l and sector planning cargue de información gener ada en los documentos de l a coordinación de biodiversid ad de la subdirección de plan CO-WWF-454892-CS-INDV / Apoyar técnicamente a la Dir ección de Ordenamiento Amb Effective integration of envir iental Territorial de MinAmbie onmental considerations at a nte en el dise-ño participativ TF / B0740 Posterior Individual Direct - National 13,785.00 0.00 Firmado 2024-10-15 2024-10-10 2024-11-03 2024-10-22 2024-11-05 2024-10-25 2024-11-09 2024-11-01 2025-05-08 ppropriate scales in territoria o y puesta en marcha del “Pr l and sector planning ograma de ordenamiento terr itorial alrededor del agua”, c omponente de ordenamiento territorial, priorizado para l CO-WWF-457812-CS-INDV / Apoyar técnicamente en los procesos de relacionamiento Landscape management for comunitario, para la impleme connectivity and resilience i ntación de acuerdos de cons TF / B0740 Posterior Individual Direct - National 7,179.00 0.00 Firmado 2024-10-25 2024-10-24 2024-11-04 2024-10-28 2024-11-06 2024-11-05 2024-11-10 2024-11-05 2025-06-08 n priority biodiversity and ec ervación-producción que favo osystem services areas recen la conectividad, gestio nados al interior del DNMI Cin aruco, como parte de la impl ementación del proyecto GEF . CO-WWF-458063-CS-INDV / Evaluar, ajustar y poner en o peración el aplicativo (visor) Landscape management for con que cuenta Corporinoqui connectivity and resilience i Ejecución pendien a con su respectivo manual d TF / B0740 Posterior Individual Open - National 10,625.00 0.00 2024-11-22 2024-12-12 2024-12-14 2024-12-17 2025-05-16 n priority biodiversity and ec te e usuario, para el monitoreo osystem services areas y acciones de conservación e n su jurisdicción, incorporar l a información generada en el marco del proyecto GEF. Page 14