HYDROPOWER DEVELOPMENT ON THE SANAGA RIVER TECHNICAL ASSISTANCE PROJECT (P157733) – NEGOTIATED PROCUREMENT PLAN Type of procurement Procurement Comments Prior Review Thresholds (US$ millions) Goods, information technology 1.5 Prior review thresholds of the type of and non-consulting services procurement are identical to those of Consultants: firms 0.5 Single Source Selection and Direct Contract. Direct contracting and Single Consultants: individuals 0.2 Source justification are cleared by the Bank as a part of the procurement plan and justified Estimat Review ed Cost by World Selection Comments/ Ref. No. Description of Assignment (US$ Bank Method Completion date millions (Prior/Pos ) t) A. MINEE-implemented activities Recruitment the Project Several Fiduciary Management team contracts to be (Coordinator, Financial 1,200,0 MI.1 IC Prior renewed every management specialist, 00 two years accountant, procurement July 2023 specialist) Several Recruitment of a Panel of contracts to be 1,500,0 MI.2 Experts (multiple individual IC Prior renewed every 00 contracts) two years June 2022 Recruitment of a qualified firm to provide support to the GoC in 1,000,0 MI.3 QCBS Prior June 2022 its contractual obligations 00 related to the Nachtigal project Recruitment of a firm for the development of the Hydrology 250,00 MI.4 QCBS Post June 2018 and Climate Change Study on 0 the Sanaga River basin Recruitment of a firm for the development of the Hydrology 1,000,0 MI.5 QCBS Prior June 2019 risk mitigation strategy and 00 mitigation mechanisms Recruitment of a firm for the 300,00 MI.6 development of a Dam safety QCBS Post December 2018 0 framework Recruitment of a firm for the Analysis of Options for 150,00 MI.7 sustainable operation and QCBS Post March 2018 0 maintenance of Publicly- financed Hydroelectric Assets Recruitment of a firm to provide support to the GoC in the 1,000,0 MI.8 Implementation of the QCBS Prior December 2019 00 Concession type options selected under MI.7 Recruitment of a firm to identify Human Resources needs in the hydroelectricity sector in the 250,00 MI.9 QCBS Prior December 2018 medium and long term and 0 develop a related capacity building strategy Procurement handled outside MI.10 Recruitment of a project auditor 50,000 LCS Prior of the Project (MINEPAT) July 2023 B. EDC-implemented activities Reinforcement of the fiduciary capacities of UGP-2 (social 420,00 EDC.1 IC Prior July 2023 development specialist, 0 environment specialist) Financed under Lom Pangar Recruitment of an individual Hydropower EDC.2 consultant to write the Project 50,000 IC Post Project or Implementation Manual (PIM) SONATREL June 2017 Recruitment of a firm for the 1,000,0 EDC.3 Sanaga River Basin Hydropower QCBS Prior December 2018 00 Potential Optimization Study Recruitment of a firm for engineering studies and the 3,000,0 EDC.4 feasibility study of a selected QCBS Prior December 2020 00 New Hydroelectric scheme (including geological baseline) Recruitment of a consultant in charge of conducting a Social 100,00 EDC.5 IC Post December 2018 Assessment alongside the 0 Sanaga River Recruitment of a firm for the Strategic Environmental and 100,00 EDC.6 Social Assessment (SESA) for the IC Post June 2019 0 development of hydroelectricity in the Sanaga basin Recruitment of a firm for the, the Environmental and a Social 200,00 EDC.7 Impact Assessment (ESIA) of the QCBS Post June 2020 0 selected hydropower plant site (including transmission lines) Recruitment of a Transaction Advisor firm to develop and pre- 1,500,0 EDC.8 QCBS Prior December 2021 negotiate contractual 00 documents and draft the bidding documents for the selection of the private developer Recruitment of a firm for the 2,000,0 EDC.9 Dam Safety Assessment of QCBS Prior December 2019 00 Mapé, Bamendjin et Mbakaou Recruitment of a fir as Assistant 750,00 EDC.10 Project Manager (APM) for the QCBS Prior December 2019 0 Operationalization of the STP Recruitment of a firm to Ensure the Reliability of the Water 150,00 EDC.11 QCBS Post December 2018 Information System of the 0 Sanaga Recruitment of a firm to develop an operational tool for 100,00 EDC.12 QCBS Post December 2018 planning and managing water 0 allocation Recruitment of an individual consultant to develop a methodology to evaluate and EDC.13 80,000 IC Post December 2017 measure specific capacity enhancement achieved by the Project Recruitment of interns to learn 300,00 6 to 12 interns EDC.14 on-the-job about hydropower IC Post 0 December 2020 related professions PROCUREMENT Cameroon : Hydropower Development on the Sanaga River Technical Assistance Project PLAN General Information Country: Cameroon 2020-02-18 Bank’s Approval Date of the Original Procurement Plan: 2024-11-12 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P157733 GPN Date: Project Name: Hydropower Development on the Sanaga River Technical Assistance Project Loan / Credit No: IDA / 60440, IDA / 60450 MINISTERE DE L'EAU ET DE L'ENERGIE Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM/MINEE/PATDHS/UGP-MIN EE/SPM/002 / Acquisition du l Project Management Suppor Single Stage - One E IDA / 60450 A posteriori Demande de prix Open - National 14,231.00 15,904.04 Achevé 2020-01-20 2020-03-23 2020-06-13 2020-04-13 2020-07-17 ogiciel TOMPRO2 pour la gest t and Capacity Building nvelope ion comptable et financière d u Projet. CM-MINEE/PATDHS/UGP-MIN Identification of hydropower EE/SPM/001 / un véhicule sta Single Stage - One E IDA / 60440 project sites on the Sanaga A posteriori Demande de prix Open - National 114,466.00 121,363.80 Achevé 2020-04-30 2020-06-30 2020-06-13 2020-07-14 2020-07-28 tion wagon 4*4 et un véhicul nvelope River Basin e pick-up double cabine. CM/MINEE/PATDHS/UGP-MIN EE/SPM/029 / Acquisition d'u Project Management Suppor Single Stage - One E IDA / 60440 A posteriori Demande de prix Open - National 74,064.00 0.00 Annulé 2021-07-03 2021-08-28 2022-02-24 n véhicule Pick-up 4x4 tout-t t and Capacity Building nvelope errain destiné au PATDHS UG P-MINEE. CM-MINEE/PATDHS/UGP-MIN EE/SPM/044 / Acquisition de t Supervision of the Nachtigal Single Stage - One E rois ordinateurs portables et IDA / 60440 A posteriori Demande de prix Open - National 8,117.00 0.00 Annulé 2022-12-19 2023-01-30 2023-07-29 Hydroelectric Project nvelope un ordinateur de bureau pour le personnel du PATDHS UGP -MINEE et la CSPM. CM-MINEE/PATDHS/UGP-MIN EE/SPM/045 / Acquisition des Project Management Suppor Single Stage - One E logiciels utilitaires pilotes et IDA / 60440 A posteriori Demande de prix Open - National 8,117.00 0.00 Annulé 2022-12-17 2023-01-14 2023-01-15 t and Capacity Building nvelope du matériel de bureau pour l es quatre nouveaux ordinate urs. CM-MINEE/PATDHS/UGP-MIN EE/SPM/046 / Acquisition mo Project Management Suppor Single Stage - One E IDA / 60440 A posteriori Demande de prix Open - National 8,117.00 0.00 Signé 2022-12-17 2023-01-14 2022-10-25 2023-01-21 bilier de bureau pour les poin t and Capacity Building nvelope ts focaux et le secrétariat du PATDHS UGP-MINEE. CM-MINEE-PATDHS-UGP-MIN EE/SPM/049 / Acquisition du Project Management Suppor Single Stage - One E IDA / 60440 A posteriori Demande de prix Open - National 8,116.58 0.00 Annulé 2023-09-17 2023-11-26 2024-11-25 petit matériel informatique d t and Capacity Building nvelope estiné au personnel du PATD HS UGP-MINEE. CM-MINEE-PATDHS-UGP-MIN EE/SPM/051 / Acquisition du Project Management Suppor Single Stage - One E IDA / 60440 A posteriori Demande de prix Open - National 8,118.04 0.00 Annulé 2023-09-17 2023-11-26 2023-12-26 Matériel de bureau destiné a t and Capacity Building nvelope u personnel du PATDHS UGP- MINEE. CM-MINEE-PATDHS-UGP-MIN EE/SPM/050 / Acquisition du Project Management Suppor Single Stage - One E IDA / 60440 A posteriori Demande de prix Open - National 8,118.03 0.00 Signé 2023-09-17 2023-11-26 2023-08-16 2023-12-26 Mobilier de bureau destiné a t and Capacity Building nvelope u personnel du PATDHS UGP- MINEE. CM-MINEE/PATDHS/UGP-MIN EE/SPM/058 / Acquisition de Project Management Suppor Single Stage - One E En cours d'ex quatre ordinateurs portables IDA / 60440 A posteriori Demande de prix Limited - National 8,118.00 0.00 2024-04-15 2024-04-08 2024-06-10 2024-07-10 t and Capacity Building nvelope écution destinés aux points focaux et à la Comptable-matières du PATDHS UGP-MINEE. CM-MINEE/PATDHS/UGP-MIN EE/SPM/059 / Acquisition des Project Management Suppor Single Stage - One E En cours d'ex IDA / 60440 A posteriori Demande de prix Limited - National 8,118.00 0.00 2024-04-09 2024-04-08 2024-06-04 2024-07-04 produits d'entretien des véhi t and Capacity Building nvelope écution cules du PATDHS UGP-MINEE NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM/MINEE/PATDHS/UGP-MIN EE/SPM/003 / souscription à Identification of hydropower Single Stage - One E police d'assurance maladie p IDA / 60440 project sites on the Sanaga A posteriori Demande de prix Open - National 3,572.00 2,924,286.18 Achevé 2020-04-09 2020-06-21 2020-06-21 2020-07-05 2021-07-31 nvelope our le personnel du program River Basin me et leurs ayants droits CM/MINEE/PATDHS/UGP-MIN EE/SPM/030 / Avenant à la po Project Management Suppor Passation de marc lice d'assurance maladie d'A IDA / 60440 A posteriori Direct 35,720.00 25,022.82 Achevé 2021-07-20 2021-07-09 2021-07-25 2021-08-11 2021-08-29 2021-08-17 2022-02-25 2022-03-07 t and Capacity Building hé de gré à gré XA pour l'équipe fiduciaire du PATDHS UGP-MINEE et ses ay ants-droits. CM-MINEE/PATDHS/UGP-MIN EE/SPM/042 / Souscription à Project Management Suppor Single Stage - One E une police d'assurance médi IDA / 60440 A posteriori Demande de prix Open - National 35,720.00 0.00 Annulé 2023-10-04 2023-11-30 2024-11-29 t and Capacity Building nvelope cale en faveur du personnel du PATDHS UGP-MINEE et leu rs Ayants-droits. Page 1 CM-MINEE/PATDHS/UGP-MIN EE/SPM/053 / Souscription à Project Management Suppor Single Stage - One E une police d'assurance médi IDA / 60440 A posteriori Demande de prix Open - National 30,849.00 0.00 Signé 2024-02-26 2024-03-30 2024-04-04 2024-05-05 t and Capacity Building nvelope cale pour le personnel-consul tants du PATDHS UGP-MINEE et leurs Ayants-droits CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM/MINEE/PATDHS/UGP-MIN Identification of hydropower Sélection fondée s EE/SPM/013 / Recrutement d' IDA / 60440 project sites on the Sanaga A posteriori ur la qualité et le Open 25,000.00 0.00 Annulé 2020-03-25 2020-04-03 2020-04-15 2020-05-29 2020-06-26 2020-07-26 2020-08-30 2020-10-04 2021-10-04 un cabinet chargé de réaliser River Basin coût l'audit externe comptable et financier du Projet CM/MINEE/PATDHS/UGP-MIN Identification of hydropower Sélection fondée s EE/SPM/004 / Suivi et contrôl Open - Internationa IDA / 60450 project sites on the Sanaga A priori ur la qualité et le 1,000,000.00 0.00 Annulé 2020-04-27 2020-10-19 2020-05-27 2020-11-06 2020-08-10 2021-02-25 2020-08-24 2021-04-21 2020-09-23 2021-08-04 2020-10-28 2021-10-21 2020-12-02 2026-07-16 e des travaux du projet Nach l River Basin coût tigal sur la Sanaga CM/MINEE/PATDHS/UGP-MIN EE/SPM/008 / Recruter un co Identification of hydropower Sélection fondée s Open - Internationa nsultant qui va mettre sur pi IDA / 60440 project sites on the Sanaga A priori ur la qualité et le 1,000,000.00 982,396.61 Signé 2020-04-30 2020-08-17 2020-05-21 2021-01-06 2020-07-04 2021-11-17 2020-08-01 2021-11-23 2020-08-31 2022-01-19 2020-10-05 2022-06-29 2020-11-09 2022-08-15 2021-11-09 l ed la stratégie de mitigation River Basin coût du risque hydrologique au Ca meroun. CM/MINEE/PATDHS/UGP-MIN EE/SPM/007 / Réalisation d'u Identification of hydropower Sélection fondée s ne étude sur l'hydrologie et s Open - Internationa IDA / 60440 project sites on the Sanaga A posteriori ur la qualité et le 250,000.00 677,514.84 Signé 2020-04-09 2020-07-15 2020-05-24 2020-08-18 2020-07-07 2020-11-03 2020-08-04 2020-12-30 2020-09-03 2021-01-13 2020-10-08 2021-01-26 2020-11-12 2021-06-13 2021-11-12 2022-06-29 ur le changement climatique l River Basin coût à l'échelle nationale et sur le bassin de la Sanaga en partic ulier. CM/MINEE/PATDHS/UGP-MIN EE/SPM/012 / Recrutement d' un cabinet chargé d'identifier Identification of hydropower Sélection fondée s les besoins des ressources h Open - Internationa IDA / 60440 project sites on the Sanaga A posteriori ur la qualité et le 250,000.00 366,421.10 Signé 2020-09-01 2021-06-18 2020-10-16 2021-08-12 2020-11-29 2021-11-10 2020-12-27 2021-12-10 2021-01-26 2021-12-15 2021-03-02 2021-12-28 2021-04-06 2022-02-23 2022-04-06 umaines dans le secteur de l' l River Basin coût hydroélectricité dans le moy en et long terme et développ er une stratégie relative de r enforcement des capacités CM/MINEE/PATDHS/UGP-MIN EE/SPM/020 / Recrutement d' Sélection fondée s une assistance légale pour le Supervision of the Nachtigal Open - Internationa IDA / 60440 A posteriori ur la qualité et le 692,274.80 694,731.72 Achevé 2020-10-15 2020-10-15 2020-11-05 2020-10-20 2020-12-19 2021-02-04 2021-01-16 2021-04-01 2021-02-15 2021-05-17 2021-03-22 2021-08-06 2021-04-26 2021-09-12 2022-04-26 2021-09-12 Gouvernement du Cameroun Hydroelectric Project l coût dans le cadre de la constructi on de l'aménagement hydroé lectrique de Nachtigal. CM/MINEE/PATDHS/UGP-MIN EE/SPM/009 / Recrutement d' Identification of hydropower Sélection fondée s Open - Internationa une firme pour établir un cad IDA / 60440 project sites on the Sanaga A posteriori ur la qualité et le 300,000.00 0.00 Annulé 2020-06-02 2020-08-03 2020-06-23 2020-08-18 2020-08-06 2020-09-23 2020-09-03 2020-11-23 2020-10-03 2020-12-02 2020-11-07 2020-12-12 2021-12-12 l re réglementaire pour la séc River Basin coût urité des barrages au Camer oun CM/MINEE/PATDHS/UGP-MIN EE/SPM/011 / Recrutement d' Identification of hydropower Sélection fondée s Open - Internationa un cabinet pour appuyer le G IDA / 60440 project sites on the Sanaga A priori ur la qualité et le 1,500,000.00 0.00 Annulé 2020-06-01 2020-07-16 2020-09-29 2020-10-27 2020-11-26 2020-12-31 2021-02-04 2021-05-05 l ouvernement dans la mise e River Basin coût n oeuvre de l'option de conc ession retenue. CM/MINEE/PATDHS/UGP-MIN EE/SPM/010 / Recrutement d' une firme pour analyser les o Identification of hydropower Sélection fondée s Open - Internationa ptions envisageables pour as IDA / 60440 project sites on the Sanaga A posteriori ur la qualité et le 250,000.00 0.00 Annulé 2020-04-09 2020-04-17 2020-05-24 2020-07-07 2020-08-04 2020-09-03 2020-10-08 2020-11-12 2021-11-12 l surer l'exploitation et la main River Basin coût tenance des ouvrages de pro duction hydroélectriques réal isés sur financement privé CM/MINEE/PATDHS/UGP-MIN EE/SPM/027 / Recrutement d' Sélection fondée s un Consultant pour accompa Supervision of the Nachtigal Open - Internationa IDA / 60440 A posteriori ur la qualité et le 608,866.00 0.00 Signé 2021-07-15 2022-02-14 2021-08-05 2022-03-16 2021-09-18 2022-08-22 2021-10-16 2022-11-14 2021-11-15 2022-12-08 2021-12-20 2023-05-02 2022-01-24 2023-08-24 2023-01-24 gner le Gouvernement du Ca Hydroelectric Project l coût meroun dans la mise en plac e de la Commission de bassi n de la Sanaga CM/MINEE/PATDHS/UGP-MIN EE/SPM/028 / Recrutement d' Advisory services for hydroel Sélection fondée s Open - Internationa un consultant pour l'étude su IDA / 60440 ectric assets concession sch A posteriori ur les qualification 132,992.00 0.00 Annulé 2021-07-26 2021-11-02 2021-08-16 2021-12-27 2021-09-29 2021-10-29 2021-12-03 2022-06-01 l r les modalités de mise en ap emes s des consultants plication du Décret N°2020/2 44 du 04 mai 2020. CM/MINEE/PATDHS/UGP-MIN Sélection fondée s EE/SPM/022 / Mise en place d Hydrological Risk Mitigation Open - Internationa IDA / 60440 A posteriori ur la qualité et le 700,000.00 0.00 Annulé 2021-07-26 2021-08-10 2021-08-16 2021-08-12 2021-09-29 2021-11-10 2021-10-27 2021-12-10 2021-11-26 2021-12-15 2021-12-31 2022-02-21 2022-02-04 2023-02-04 'un cadre réglementaire pour and Dam Safety l coût la sécurité des barrages au C ameroun. CM/MINEE/PATDHS/UGP-MIN EE/SPM/037 / Recrutement d' Sélection fondée s un Consultant/Assistant Tech Project Management Suppor Open - Internationa IDA / 60440 A posteriori ur la qualité et le 1,300,000.00 1,113,646.93 Signé 2021-10-28 2021-10-28 2021-11-18 2022-01-01 2021-11-04 2022-01-29 2021-12-06 2022-02-28 2021-12-10 2022-04-04 2021-12-17 2022-05-09 2022-01-03 2023-05-09 nique pour la supervision des t and Capacity Building l coût travaux de construction de l' aménagement hydroélectriq ue de Nachtigal - amont. CM-MINEE/PATDHS/UGP-MIN EE/SPM/041 / Recrutement d' Sélection fondée s un consultant chargé de disp Project Management Suppor IDA / 60440 A posteriori ur les qualification Open - National 7,956.00 0.00 Signé 2022-12-16 2023-01-27 2023-01-06 2023-02-21 2023-01-27 2023-08-17 2023-02-03 2023-08-17 2023-02-17 2023-08-30 2023-02-22 enser la formation sur l'intég t and Capacity Building s des consultants ration de l'approche genre d ans les Projets de Développe ment. CM-MINEE/PATDHS/UGP-MIN EE/SPM/043 / Recrutement d' Sélection fondée s un consultant chargé de la m Hydrological Risk Mitigation Open - Internationa IDA / 60440 A posteriori ur la qualité et le 700,000.00 0.00 Annulé 2023-01-17 2023-04-17 2023-02-07 2023-03-07 2023-03-14 2023-04-04 2023-05-02 2023-05-30 2024-02-24 ise en œuvre d'un cadre règl and Dam Safety l coût ementaire et structurel pour l a sécurité des barrages au C ameroun. Page 2 CM/MINEE/PATDHS/UGP-MIN EE/SPM/052 / Recrutement d' un consultant chargé de réali Sélection fondée s ser l'audit comptable et finan Supervision of the Nachtigal Open - Internationa En cours d'exécut IDA / 60440 A posteriori ur la qualité et le 34,096.44 0.00 2023-09-08 2023-09-06 2023-09-22 2023-10-26 2023-11-05 2023-12-14 2023-11-19 2024-02-21 2023-12-10 2024-02-26 2024-01-14 2024-03-12 2024-02-18 2024-02-24 cier du Projet d'Assistance te Hydroelectric Project l ion coût chnique pour le Développem ent de l'Hydroélectricité sur l a Sanaga pour les exercices 2023 et 2024. CM-MINEE/PATDHS/UGP-MIN EE/SPM/054 / Recrutement d' un consultant pour la formati on du personnel du PATDHS Sélection fondée s Supervision of the Nachtigal UGP-MINEE en "Man over Boa IDA / 60440 A posteriori ur les qualification Open - National 24,355.00 0.00 Annulé 2024-03-11 2024-03-26 2024-04-01 2024-05-15 2024-06-14 2024-07-19 2025-01-15 Hydroelectric Project t" : les risques de chute à l'e s des consultants au des EPI, EPC en lien avec l es risques de chutes à l'eau, alerte de secours, prises de mesures adaptées CM-MINEE/PATDHS/UGP-MIN EE/SPM/055 / Recrutement d' Sélection fondée s un consultant pour la formati Project Management Suppor Open - Internationa IDA / 60440 A posteriori ur les qualification 32,473.00 0.00 Annulé 2024-03-11 2024-03-26 2024-04-01 2024-04-29 2024-05-29 2024-07-03 2024-08-02 on du personnel du PATDHS t and Capacity Building l s des consultants UGP-MINEE sur le thème : "R éussir la clôture" d'un Projet de Développement. CM-MINEE/PATDHS/UGP-MIN EE/SPM/056 / Recrutement d' Sélection fondée s un consultant pour l'acquisiti Project Management Suppor IDA / 60440 A posteriori ur les qualification Open - National 16,236.00 0.00 Annulé 2024-03-18 2024-04-08 2024-05-22 2024-06-05 2024-07-03 2024-08-02 on du logiciel MICROSOFT PR t and Capacity Building s des consultants OJECT et la formation du pers onnel du PATDHS UGP-MINEE sur l'utilisation dudit logiciel. CM-MINEE/PATDHS/UGP-MIN Sélection fondée s EE/SPM/057 / Recrutement d' Project Management Suppor Open - Internationa IDA / 60440 A posteriori ur la qualité et le 48,709.00 0.00 Annulé 2024-03-25 2024-05-02 2024-04-15 2024-06-14 2024-07-12 2024-08-11 2024-09-15 2024-10-27 2025-10-27 un consultant pour la capitali t and Capacity Building l coût sation des activités du PATD HS UGP-MINEE. CM-MINEE-433290-CS-CQS / Sélection fondée s Recrutement d'un consultant Project Management Suppor En cours d'exame IDA / 60440 A posteriori ur les qualification Open - National 49,000.00 0.00 2024-06-24 2024-06-19 2024-07-15 2024-08-12 2024-08-26 2024-09-10 2025-03-09 firme pour la capitalisation d t and Capacity Building n s des consultants es activités du PATDHS UGP- MINEE. CM-MINEE-456872-CS-CQS / Recrutement d'un consultant Sélection fondée s Project Management Suppor -firme en vue de l'élaboration IDA / 60440 A posteriori ur les qualification Open - National 48,700.00 0.00 Annulé 2024-10-31 2024-11-21 2024-12-19 2025-01-09 2025-02-06 2025-03-08 t and Capacity Building d'un document de capitalisati s des consultants on des réalisations du PATDH S. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM/MINEE/PATDHS/UGP-MIN EE/SPM/019 / Avenant au con trat de Monsieur Marinos PAV Hydrological Risk Mitigation IDA / 60440 A posteriori Individuel Direct 200,000.00 0.00 Annulé 2020-04-20 2020-07-09 2020-04-30 2021-05-22 2020-05-21 2020-06-25 2020-12-22 LOS, expert Géologue Géotec and Dam Safety hnicien dans le panel des ex perts techniques sécurité des barrages. CM/MINEE/PATDHS-UGP-MIN EE/SPM/018 / Avenant au con Hydrological Risk Mitigation trat de Monsieur Federico CIA IDA / 60440 A posteriori Individuel Direct 200,000.00 0.00 Signé 2020-04-20 2020-07-09 2020-04-30 2021-05-22 2020-05-21 2021-09-06 2020-06-25 2021-10-05 2020-12-22 and Dam Safety MPITTI, expert Hydro-mécani cien du panel technique sécu rité des barrages. CM/MINEE/PATDHS/UGP-MIN EE/SPM/017 / Recrutement p ar Entente Directe du chef du Hydrological Risk Mitigation panel des Experts techniques IDA / 60440 A posteriori Individuel Direct 200,000.00 0.00 Signé 2020-08-10 2020-10-08 2020-09-14 2021-05-22 2020-10-05 2021-08-10 2020-11-09 2021-10-05 2023-08-05 and Dam Safety sécurité des barrages : Monsi eur Ascensio LARA , Expert e n développement Hydro-élec trique. CM/MINEE/PATDHS/UGP-MIN EE/SPM/014 / Recrutement d' Hydrological Risk Mitigation IDA / 60450 A posteriori Individuel Open 200,000.00 0.00 Annulé 2020-04-27 2020-04-17 2020-07-01 2020-07-22 2020-08-26 2022-08-26 un Expert Environnementalis and Dam Safety te dans le panel Environnem ent du PATDHS CM/MINEE/PATDHS/UGP-MIN EE/SPM/015 / Recrutement d' Hydrological Risk Mitigation IDA / 60440 A posteriori Individuel Open 200,000.00 0.00 Annulé 2020-04-03 2020-04-18 2020-07-02 2020-10-20 2020-07-23 2020-08-27 2022-08-27 un Expert Socio-anthropolog and Dam Safety ue dans le panel Environnem ent du PATDHS . CM/MINEE/PATDHS/UGP-MIN EE/SPM/016 / Recrutement d' Hydrological Risk Mitigation IDA / 60440 A posteriori Individuel Open 200,000.00 0.00 Annulé 2020-04-27 2020-04-17 2020-07-01 2020-07-22 2020-08-26 2022-08-26 un Spécialiste en santé publi and Dam Safety que dans le panel Environne ment du PATDHS. CM/MINEE/PATDHS/UGP-MIN EE/SPM/023 / Recrutement d' Supervision of the Nachtigal un Environnementaliste, chef IDA / 60440 A posteriori Individuel Open 200,000.00 0.00 Annulé 2021-06-25 2021-07-09 2021-08-13 2021-09-03 2021-10-08 2022-04-06 Hydroelectric Project du Panel Environnemental et social du PATDHS UGP-MINEE . CM/MINEE/PATDHS/UGP-MIN EE/SPM/006 / Recrutement d Identification of hydropower e l'expert Hydrologue du pan IDA / 60440 project sites on the Sanaga A posteriori Individuel Open 200,000.00 0.00 Annulé 2020-04-09 2020-05-22 2020-06-28 2020-07-19 2020-08-23 2021-02-19 el technique sécurité des bar River Basin rages au PATDHS UGP MINEE . CM/MINEE/PATDHS/UGP-MIN EE/SPM/031 / Avenant N°2 au Project Management Suppor IDA / 60440 A posteriori Individuel Direct 45,462.00 0.00 Annulé 2021-06-28 2021-07-08 2021-07-29 2021-09-02 2022-03-01 contrat du Coordonnateur Mo t and Capacity Building nsieur PODIE Luc CM/MINEE/PATDHS/UGP-MIN EE/032 / Avenant N°2 au con Project Management Suppor IDA / 60440 A posteriori Individuel Direct 41,228.00 0.00 Annulé 2021-06-28 2021-07-08 2021-07-29 2021-09-02 2022-03-01 trat du Responsable Administ t and Capacity Building ratif et Financier Monsieur AB EGA NGUINI Gilles Page 3 CM/MINEE/PATDHS/UGP-MIN EE/033 / Avenant N°2 au con Project Management Suppor trat de la Spécialiste en Pass IDA / 60440 A posteriori Individuel Direct 40,692.00 0.00 Annulé 2021-06-28 2021-07-08 2021-07-29 2021-09-02 2022-03-01 t and Capacity Building ation des Marchés Madame N DZIE EVOUNA Blanche C. éps e EKANE CM/MINEE/PATDHS/UGP-MIN Project Management Suppor EE/035 / Avenant N°2 au con IDA / 60440 A posteriori Individuel Direct 34,481.00 0.00 Annulé 2021-06-28 2021-07-08 2021-07-29 2021-09-02 2022-03-01 t and Capacity Building trat du Comptable monsieur ESSAMA Tobie. CM/MINEE/PATDHS/UGP-MIN Sélection de cons EE/SPM/026 / Recrutement d' Supervision of the Nachtigal IDA / 60440 A posteriori ultants par entent Direct 200,000.00 0.00 Signé 2021-07-16 2021-08-10 2021-07-26 2021-07-15 2021-09-29 2021-10-05 2022-03-28 un Expert Hydrologue dans l Hydroelectric Project e directe e panel Sécurité des Barrage s. CM/MINEE/PATDHS/UGP-MIN EE/SPM/024 / Recrutement d' Supervision of the Nachtigal IDA / 60440 A posteriori Individuel Open 200,000.00 0.00 Signé 2021-07-26 2021-08-10 2021-09-13 2021-08-12 2021-10-04 2021-09-06 2021-11-08 2021-11-03 2022-05-07 un Socio-anthropologue dans Hydroelectric Project le panel environnemental et social du PATDHS. CM/MINEE/PATDHS/UGP-MIN EE/SPM/025 / Recrutement d' Supervision of the Nachtigal IDA / 60440 A posteriori Individuel Open 200,000.00 0.00 Signé 2021-07-26 2021-08-10 2021-09-13 2021-08-12 2021-10-04 2021-09-06 2021-11-08 2021-08-03 2022-05-07 un Spécialiste en santé publi Hydroelectric Project que option épidémiologiste. CM/MINEE/PATDHS/UGP-MIN EE/036 / Recrutement de l'Ex Project Management Suppor IDA / 60440 A posteriori Individuel Open 40,692.00 0.00 Signé 2021-10-28 2021-11-12 2021-12-16 2022-03-05 2022-01-06 2022-01-04 2022-02-10 2022-07-11 2022-08-09 pert en Développement Soci t and Capacity Building al et Environnemental du PA TDHS UGP-MINEE. CM/MINEE/PATDHS/UGP-MIN EE/SPM/038 / Recrutement d' Project Management Suppor En cours d'exécut IDA / 60440 A posteriori Individuel Open 200,000.00 0.00 2021-10-26 2021-11-02 2021-12-14 2022-01-04 2022-02-08 2022-08-07 un Expert Géologue/Géotech t and Capacity Building ion nicien membre du panel sécu rité des barrages. CM/MINEE/PATDHS/UGP-MIN EE/SPM/039 / Recrutement d' un Consultant Individuel char Project Management Suppor gé de la formation des memb IDA / 60440 A posteriori Individuel Open 9,742.00 0.00 Achevé 2021-10-26 2021-12-05 2021-12-14 2021-12-08 2022-01-04 2022-01-19 2022-02-08 2022-07-29 2022-08-07 2022-10-11 t and Capacity Building res de la Commission Spécial e de Passation des Marchés d ans les procédures de la Ban que mondiale. CM-MINEE/PATDHS/UGP-MIN EE/SPM/040 / Recrutement d' Supervision of the Nachtigal Open - Internationa un Environnementaliste, chef IDA / 60440 A posteriori Individuel 200,000.00 0.00 Signé 2022-12-09 2023-01-10 2023-01-27 2023-05-11 2023-02-17 2023-05-11 2023-03-24 2023-07-06 2023-09-20 Hydroelectric Project l du panel environnemental et social du PATDHS UGP-MINEE . CM-MINEE/PATDHS/UGP-MIN EE/SPM/047 / Recrutement d' un Consultant Individuel pour Supervision of the Nachtigal IDA / 60440 A posteriori Individuel Open - National 16,237.00 0.00 Signé 2023-03-20 2023-09-03 2023-04-22 2023-09-19 2023-05-06 2023-11-03 2023-06-17 2024-02-01 2023-06-22 former le personnel de l'Unit Hydroelectric Project é de Gestion du PATDHS-MIN EE dans la gestion des contra ts. CM-MINEE/PATDHS/UGP-MIN EE/SPM/048 / Recrutement d' un consultant devant accom Identification of hydropower Sélection de cons pagner l'Etat du Cameroun d Open - Internationa IDA / 60440 project sites on the Sanaga A posteriori ultants par entent 500,000.00 0.00 Signé 2023-06-30 2023-06-29 2023-07-28 2023-07-05 2023-09-01 2023-09-13 2023-09-04 ans le processus d'évaluation l River Basin e directe de l'action d'ENEO et la signa ture d'un protocole transacti onnel en vue du rachat par l' Etat des Actions d'ACTIS dan s la société ENEO. CM-MINEE-433304-CS-INDV / Recrutement d'un consultant - firme pour l'acquisition du l Project Management Suppor IDA / 60440 A posteriori Individuel Limited - National 16,500.00 0.00 Annulé 2024-06-25 2024-06-19 2024-06-30 2024-07-21 2024-08-05 2024-09-05 ogiciel MICROSOFT PROJECT t and Capacity Building et la formation du personnel du PATDHS UGP-MINEE sur l' utilisation dudit logiciel. CM-MINEE-447456-CS-CDS / Recrutement d'un consultant -firme pour la formation du p Sélection de cons ersonnel du PATDHS UGP-MI Project Management Suppor En cours d'exécut IDA / 60440 A posteriori ultants par entent Direct - National 7,900.00 0.00 2024-09-02 2024-09-11 2024-09-30 2024-09-16 2024-11-25 2024-12-25 NEE en "Man over boat" , les t and Capacity Building ion e directe risques de chute à l'eau des EPI, EPC en lien avec les risq ues de chute à l'eau, alerte d e secours, prises de mesures adaptées. CM-MINEE-454371-CS-INDV / Formation du personnel du P Project Management Suppor En cours d'exame IDA / 60440 A posteriori Individuel Limited - National 11,700.00 0.00 2024-10-08 2024-10-14 2024-10-13 2024-11-03 2024-12-08 2024-12-15 ATDHS UGP-MINEE sur l'utilis t and Capacity Building n ation du logiciel MS PROJECT. CM-MINEE-455910-CS-INDV / Recrutement d'un Consultant individuel, Expert en suivi-év Supervision of the Nachtigal IDA / 60440 A posteriori Individuel Limited - National 24,500.00 0.00 Annulé 2024-10-15 2024-10-29 2024-11-19 2024-12-17 2025-02-15 aluation en vue de l'élaborati Hydroelectric Project on d'un document de capitali sation des réalisations du PA TDHS. CM-MINEE-455914-CS-INDV / Recrutement d'un Consultant individuel, Expert en commu Supervision of the Nachtigal IDA / 60440 A posteriori Individuel Limited - National 24,500.00 0.00 Annulé 2024-10-15 2024-10-16 2024-11-06 2024-12-04 2025-02-02 nication en vue de l'élaborati Hydroelectric Project on d'un document de capitali sation des réalisations du PA TDHS. CM-MINEE-461466-CS-INDV / Recrutement d'un Consultant Project Management Suppor En attente d'exéc Individuel en vue de l'élabora IDA / 60440 A posteriori Individuel Limited - National 24,500.00 0.00 2024-11-18 2024-12-02 2024-12-23 2025-01-27 2025-02-02 t and Capacity Building ution tion d'un document de capita lisation des réalisations du P ATDHS. CM-MINEE-461467-CS-INDV / Recrutement d'un Consultant Individuel_Expert en commu Project Management Suppor En attente d'exéc IDA / 60440 A posteriori Individuel Limited - National 24,500.00 0.00 2024-11-18 2024-12-02 2024-12-23 2025-01-27 2025-04-01 nication en vue de l'élaborati t and Capacity Building ution on d'un documentaire de cap italisation des réalisations du PATDHS. Page 4