PROCUREMENT PLAN (Textual Part) Project information: [country]Congo Democratic Republic, EMERGENCY EQUITY AND SYSTEM STRENGTHENING IN EDUCATION PROJECT [Project name] [P-number] Project Implementation agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this Procurement Plan: [insert from – to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Congo, Democratic Republic of : DR Congo Emergency Equity and System Strengthening in Education PLAN General Information Country: Congo, Democratic Republic of 2020-08-11 Bank’s Approval Date of the Original Procurement Plan: 2024-11-06 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P172341 GPN Date: Project Name: DR Congo Emergency Equity and System Strengthening in Education Loan / Credit No: IDA / 66920 Permanent Secretariat for Support and Coordination of the Education Sector Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-SPACE-214168-CW-RFQ / Travaux d'aménagement des Component 3: Strengthening Request for Quota Single Stage - One E 2021-04-2 IDA / 66920 Post Limited 52,613.00 Signed 2021-01-22 2021-01-05 2021-03-10 2021-03-07 bureaux pour l'Equipe de Coo Systems for Results tions nvelope 4 rdination du Projet (ECP) du P rojet PERSE Request for ZR-SPACE-272628-CW-RFQ / Quotations - TRAVAUX D'AMENAGEMENT Component 3: Strengthening Request for Quota Single Stage - One E Small Works 2022-09-0 IDA / 66920 Post Limited 0.00 Signed 2022-01-16 2022-08-18 2022-03-13 2022-10-28 DE 6 CONTAINERS EN BUREA Systems for Results tions nvelope (Emergency) 9 UX POUR LE PROJET PERSE SPD -Compet itive Request for ZR-SPACE-296497-CW-RFQ / Quotations - Travaux d'aménagement des Component 3: Strengthening Request for Quota Single Stage - One E Small Works 2023-01-2 IDA / 66920 Post Limited 0.00 Signed 2022-06-06 2022-08-18 2022-08-01 2022-10-17 douze (12) bureaux en faveu Systems for Results tions nvelope (Emergency) 8 r des Directions d'appui MEP SPD -Compet ST itive GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-SPACE-209748-GO-RFQ / Component 3: Strengthening Request for Quota Single Stage - One E Fourniture des supports de c IDA / 66920 Post Limited 69,950.00 Signed 2020-12-15 2020-12-04 2021-01-28 2021-01-25 2021-02-27 Systems for Results tions nvelope ommunication pour le PERSE ZR-SPACE-209751-GO-RFQ / Fourniture et installation des Component 3: Strengthening Request for Quota Single Stage - One E IDA / 66920 Post Limited 45,800.00 Completed 2020-12-15 2020-12-04 2021-01-10 2021-01-25 2021-02-09 2021-04-04 équipements vidéo conféren Systems for Results tions nvelope ce pour l'UCP PERSE ZR-SPACE-209756-GO-RFQ / Component 3: Strengthening Request for Quota Single Stage - One E Acquisition de deux véhicule IDA / 66920 Post Limited 94,450.00 Completed 2020-12-15 2020-12-15 2021-01-05 2021-04-01 2021-02-04 2021-09-25 Systems for Results tions nvelope s utilitaires pour l'UCP PERSE ZR-SPACE-229255-GO-RFQ / ACQUISITION MOBILIER DE B Component 3: Strengthening Request for Quota Single Stage - One E IDA / 66920 Post Limited 94,415.00 Completed 2021-04-19 2021-04-15 2021-06-14 2021-05-24 2021-12-11 UREAU POUR L'EQUIPE DE C Systems for Results tions nvelope OORDINATION (ECP) DU PROJ ET PERSE A KINSHASA ZR-SPACE-229266-GO-RFQ / ACQUISITION EQUIPEMENTS I Component 3: Strengthening Request for Quota Single Stage - One E NFORMATIQUES POUR L'EQU IDA / 66920 Post Limited 94,060.00 Completed 2021-04-19 2021-04-15 2021-06-14 2021-05-24 2021-12-11 2021-07-08 Systems for Results tions nvelope IPE DE COORDINATION DU P ROJET PERSE A KINSHASA ZR-SPACE-237602-GO-RFQ / ACQUISITION DES FOURNITU RES DE BUREAU ET CONSOM Component 3: Strengthening Request for Quota Single Stage - One E MABLES INFORMATIQUES PO IDA / 66920 Post Limited 52,533.83 Completed 2021-06-06 2021-07-26 2021-08-01 2021-08-17 2022-01-28 Systems for Results tions nvelope UR L'EQUIPE DE COORDINATI ON DU PROJET (ECP) PERSE P OUR 3 MOIS ( JUILLET -AOUT- SEPTEMBRE 2021) ZR-SPACE-248721-GO-RFP / Component 3: Strengthening Request for Quota Single Stage - One E Impression du code de bonne IDA / 66920 Post Limited 103,550.00 Completed 2021-09-19 2021-08-23 2021-11-07 2021-09-27 2022-02-05 2022-01-31 Systems for Results tions nvelope conduite (Acte d'engagemen t) ZR-SPACE-252528-GO-RFB / Component 3: Strengthening Single Stage - One E Under Imple ACQUISITION DE 11 VEHICUL IDA / 66920 Post Request for Bids Open - National 0.00 2021-09-08 2021-11-01 2021-09-13 2021-10-25 2021-11-24 2021-12-29 2022-06-27 Systems for Results nvelope mentation ES DE TERRAIN POUR LE PRO JET PERSE ZR-SPACE-256454-GO-RFQ / ACQUISITION DE MOBILIER D E BUREAU POUR L'EQUIPE DE Component 3: Strengthening Request for Quota Single Stage - One E COORDINATION DU PROJET P IDA / 66920 Post Limited 60,600.00 Completed 2021-10-09 2021-09-27 2021-12-04 2021-10-26 2022-06-02 2021-12-09 Systems for Results tions nvelope ERSE (ECP EN PROVINCE : KA NANGA, MBUJI-MAYI, TSHIKAP A, KABINDA, MATADI, BANDU NDU VILLE ZR-SPACE-259196-GO-RFQ / Component 3: Strengthening Request for Quota Single Stage - One E FOURNITURE DES SUPPORTS IDA / 66920 Post Limited 98,550.00 Completed 2021-10-26 2021-10-21 2021-12-21 2021-12-20 2022-06-19 2022-02-19 Systems for Results tions nvelope DE COMMUNICATION POUR L E PROJET PERSE ZR-SPACE-261260-GO-RFB / Component 3: Strengthening Single Stage - One E IMPRESSION DU CODE DE BO IDA / 66920 Post Request for Bids Open - National 0.00 Completed 2021-11-02 2022-03-30 2021-11-07 2021-12-19 2022-05-03 2022-01-18 2022-06-10 2022-02-22 2022-08-18 2022-08-21 2022-10-25 Systems for Results nvelope NNE CONDUITE ZR-SPACE-272906-GO-RFQ / ACQUISITION D'UN SYSTEME Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl ELECTRONIQUE DE POINTAG IDA / 66920 Post Limited 0.00 2022-01-18 2022-03-15 2022-09-11 Systems for Results tions nvelope ementation E DE PRESENCE DU PERSON NEL DU PROJET PERSE ZR-SPACE-272911-GO-RFQ / ACQUISITION DES FOURNITU Component 3: Strengthening Request for Quota Single Stage - One E IDA / 66920 Post Limited 0.00 Signed 2022-01-18 2022-04-08 2022-03-15 2023-02-24 2022-09-11 RES DE BUREAU ET PETITS M Systems for Results tions nvelope ATERIELS POUR LE PROJET PE RSE ZR-SPACE-272912-GO-RFQ / ACQUISITION DES CONSOMM Component 3: Strengthening Request for Quota Single Stage - One E IDA / 66920 Post Limited 0.00 Signed 2022-01-18 2022-04-08 2022-03-15 2023-02-23 2022-09-11 ABLES INFORMATIQUES POU Systems for Results tions nvelope R LE PROJET PERSE Page 1 ZR-SPACE-272914-GO-RFQ / ACQUISITION DU MATERIEL E Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl T LOCATION D'UNE BANDE P IDA / 66920 Post Limited 0.00 2022-01-18 2022-03-15 2022-09-11 Systems for Results tions nvelope ementation ASSANTE POUR L'ABONNEME NT INTERNET DES BUREAUX DU PROJET PERSE ZR-SPACE-256601-GO-RFQ / ACQUISITION ET INSTALLATI Component 3: Strengthening Request for Quota Single Stage - One E ON D'UN GROUPE ELECTROG IDA / 66920 Post Limited 34,200.00 Completed 2021-10-10 2021-10-06 2021-12-05 2021-10-29 2022-06-03 2021-11-05 Systems for Results tions nvelope ENE DE 100 KVA POUR LE PR OJET PERSE A KINSHASA ZR-SPACE-296501-GO-RFQ / Acquisition d'Ordinateurs por tables (Laptops), imprimante Component 3: Strengthening Request for Quota Single Stage - One E IDA / 66920 Post Limited 0.00 Completed 2022-06-14 2022-06-01 2022-08-09 2022-08-02 2023-02-05 2022-08-25 s en couleurs et les Rétroproj Systems for Results tions nvelope ecteurs vidéo en faveur des Directions d'appui du MEPST ZR-SPACE-296503-GO-RFQ / Acquisition des mobiliers et c Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl IDA / 66920 Post Limited 0.00 2022-06-19 2022-08-14 2023-02-10 limatisation des bureaux des Systems for Results tions nvelope ementation Directions d'appui du MEPST ZR-SPACE-300083-GO-RFB / ACQUISITION DES MOTOS AU Component 3: Strengthening Single Stage - One E IDA / 66920 Post Request for Bids Open - National 0.00 Signed 2022-09-16 2022-08-19 2022-09-21 2022-11-02 2022-09-22 2022-12-02 2022-10-14 2023-01-06 2022-11-09 2023-07-05 PROFIT DES SOUS-DIVISIONS Systems for Results nvelope PROVINCIALES CIBLEES PAR LE PERSE ZR-SPACE-300092-GO-RFB / ACQUISITION DE CANOTS RA Component 3: Strengthening Single Stage - One E Pending Impl IDA / 66920 Post Request for Bids Open - National 0.00 2022-08-22 2022-08-27 2022-10-08 2022-11-07 2022-12-12 2023-06-10 PIDES AU PROFIT DES 2 SOU Systems for Results nvelope ementation S DIVISIONS LACUTSRES ZR-SPACE-300098-GO-RFB / ACQUISITION DES KITS INFOR Component 3: Strengthening Single Stage - One E MATIQUES (LAP TOP ET IMPR IDA / 66920 Post Request for Bids Open - National 0.00 Signed 2022-09-15 2022-08-18 2022-09-20 2022-11-01 2022-09-20 2022-12-01 2022-10-12 2023-01-05 2023-01-05 2023-07-04 Systems for Results nvelope OMANTES) AU PROFIT DES DI VISIONS PROVINCIALES CIBL EES PAR LE PERSE ZR-SPACE-305596-GO-RFB / ACQUISITION DE MATERIEL I Component 3: Strengthening Open - Internationa Single Stage - One E IDA / 66920 Prior Request for Bids 0.00 Canceled 2022-08-16 2022-10-20 2022-08-21 2022-11-23 2022-10-02 2023-01-10 2022-11-01 2022-12-06 2023-06-04 NFORMATIQUE POUR LES DIF Systems for Results l nvelope FERENTES DIRECTIONS DU M EPST ZR-SPACE-305616-GO-RFQ / PRODUCTION DES SUPPORTS Component 3: Strengthening Request for Quota Single Stage - One E Under Imple IDA / 66920 Post Limited 0.00 2022-07-27 2022-10-13 2022-09-21 2023-03-20 DE FIN D'ANNEE (AGENDAS, Systems for Results tions nvelope mentation CALENDRIERS ET AUTRES GA DGET) ZR-SPACE-305621-GO-RFQ / PRODUCTION DES SUPPORTS Component 3: Strengthening Request for Quota Single Stage - One E IDA / 66920 Post Limited 0.00 Completed 2022-07-27 2022-08-18 2022-09-21 2022-10-03 2023-03-20 2023-02-27 DE VULGARISATION DU NUM Systems for Results tions nvelope ERO VERT 178 ZR-SPACE-305623-GO-RFQ / PRODUCTION DES FEUILLETS Component 3: Strengthening Request for Quota Single Stage - One E IDA / 66920 Post Limited 0.00 Completed 2022-08-31 2022-09-22 2022-10-26 2023-03-01 2023-04-24 2023-03-30 DE SENSIBIISATION SUR LE M Systems for Results tions nvelope ECANISME DE GESTION DES PLAINTES ZR-SPACE-305626-GO-RFQ / IMPRESSION DES SUPPORTS Component 3: Strengthening Request for Quota Single Stage - One E IDA / 66920 Post Limited 0.00 Signed 2022-08-29 2022-08-18 2022-10-24 2023-02-14 2023-04-22 DE VISIBILITE DU PROJET/RE Systems for Results tions nvelope NOUVELLEMENT STOCK ZR-SPACE-305631-GO-RFQ / Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl PRODUCTION ET MULTIPLICA IDA / 66920 Post Limited 0.00 2022-07-27 2022-09-21 2023-03-20 Systems for Results tions nvelope ementation TION DES MODULES DE FOR MATION ZR-SPACE-305634-GO-RFQ / Component 3: Strengthening Request for Quota Single Stage - One E PRODUCTION DES SUPPORTS IDA / 66920 Post Limited 0.00 Completed 2022-08-20 2022-09-13 2022-10-11 2022-10-31 2023-04-09 2022-11-07 Systems for Results tions nvelope DE SENSIBILISATION DIFORE ZR-SPACE-305636-GO-RFQ / Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl IMPRESSION DU MODULE MG IDA / 66920 Post Limited 0.00 2022-07-27 2022-09-21 2023-03-20 Systems for Results tions nvelope ementation P EN 15 000 EXEMPLAIRES (I LD4) ZR-SPACE-305637-GO-RFQ / IMPRESSION DU MANUEL DE Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl IDA / 66920 Post Limited 0.00 2022-07-27 2022-09-21 2023-03-20 PROCEDURE DE GESTION DE Systems for Results tions nvelope ementation S FRAIS DE FONCTIONNEMEN T ZR-SPACE-305638-GO-RFQ / Component 3: Strengthening Request for Quota Single Stage - One E Under Imple IMPRESSION DE MANUEL DE IDA / 66920 Post Limited 0.00 2022-07-27 2022-09-21 2023-03-20 Systems for Results tions nvelope mentation FORMATION DE COGES ZR-SPACE-305640-GO-RFQ / Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl IDA / 66920 Post Limited 0.00 2022-07-27 2022-09-21 2023-03-20 IMPRESSION BUDGET CITOYE Systems for Results tions nvelope ementation N ZR-SPACE-329759-GO-RFQ / ACQUISITION DE 10 GROUPE Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl S ELECTROGENES POUR LES IDA / 66920 Post Limited 0.00 2022-12-17 2023-02-11 2023-08-10 Systems for Results tions nvelope ementation BUREAUX PERSE EN PROVIN CES (10KVA), FRAIS D'INSTAL LATION ET ACCESSOIRES ZR-SPACE-358640-GO-DIR / Contractualisation avec la fir me GMSP-COM pour l'acquisit Component 3: Strengthening Under Imple IDA / 66920 Post Direct Selection Direct - National 0.00 2023-04-26 2023-04-25 2023-05-01 2023-04-24 2023-06-05 2023-12-02 ion des cartes SIM VPN et forf Systems for Results mentation ait connexion pour la collecte des données dans les 10 Pro vinces ciblées par le PERSE ZR-SPACE-358644-GO-DIR / Contractualisation avec la fir Component 3: Strengthening me LIFT TECH COMPANY pou IDA / 66920 Post Direct Selection Direct - National 0.00 Signed 2023-04-26 2023-04-25 2023-05-01 2023-04-24 2023-06-05 2023-04-28 2023-12-02 Systems for Results r l'acquisition de 1000 Tablet tes pour la collecte des donn ées scolaires 2022-2023 ZR-SPACE-380199-GO-RFB / Component 2: Laying the Fo Open - Internationa Single Stage - One E Acquisition des Tablettes et a IDA / 66920 Prior Request for Bids 0.00 Canceled 2023-09-15 2023-09-20 2023-11-01 2023-12-01 2024-01-05 2024-07-03 undations for Quality l nvelope utre matériel de la DIGE en ci nq (5) lots Page 2 ZR-SPACE-387138-GO-RFQ / Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl Acquisition des fournitures d IDA / 66920 Post Limited 0.00 2023-10-31 2023-12-26 2024-06-23 Systems for Results tions nvelope ementation e bureau du Projet PERSE ZR-SPACE-387139-GO-RFQ / Acquisition des Consommabl Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl IDA / 66920 Post Limited 0.00 2023-10-29 2023-12-24 2024-06-21 es informatiques et petit mat Systems for Results tions nvelope ementation ériel du Projet PERSE ZR-SPACE-425048-GO-RFB / Component 1: Enabling Free Open - Internationa Single Stage - Two E Acquisition des tablettes et a IDA / 66920 Prior Request for Bids 0.00 Canceled 2024-05-20 2024-05-21 2024-07-05 2024-08-02 2024-09-06 2024-12-05 Access for All l nvelope utres matériels informatiques ZR-SPACE-437033-GO-RFB / Component 3: Strengthening Open - Internationa Pending Impl Acquisition des tablettes et a IDA / 66920 Prior Request for Bids 0.00 2024-07-03 2024-07-08 2024-08-22 2024-09-01 2024-09-18 2024-11-02 Systems for Results l ementation utres matériels informatiques par le PERSE ZR-SPACE-449790-GO-RFB / Acquisition de 12 900 tablett Component 3: Strengthening Open - Internationa Single Stage - One E Under Imple IDA / 66920 Prior Request for Bids 0.00 2024-09-12 2024-09-24 2024-09-14 2024-10-07 2024-10-29 2024-11-03 2024-11-16 2024-12-31 es et autres matériels inform Systems for Results l nvelope mentation atiques par le PERSE NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-SPACE-227692-NC-DIR / Acquisition du logiciel TOMPR Component 3: Strengthening Pending Impl IDA / 66920 Post Direct Selection Direct 0.00 2021-09-14 2021-09-19 2021-10-24 2021-11-23 O pour la gestion comptable Systems for Results ementation du projet PERSE : TOMATE ZR-SPACE-272910-NC-RFB / RECRUTEMENT D'UN PRESTA TAIRE EN QUALITE D'UNE AG Component 3: Strengthening Single Stage - One E Pending Impl IDA / 66920 Post Request for Bids Open - National 0.00 2022-01-13 2022-01-18 2022-03-01 2022-03-31 2022-05-05 2022-11-01 ENCE DE VOYAGE POUR L'AC Systems for Results nvelope ementation QUISITION DES TITRES DE VO YAGE AINSI QUE LES FORMAL ITES Y RELATIVES ZR-SPACE-272913-NC-RFQ / RECRUTEMENT D'UN CABINE T EN CHARGE DE L'ENTRETIE Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl IDA / 66920 Post Limited 0.00 2022-01-18 2022-03-15 2022-09-11 N ET MAINTENANCE DU MAT Systems for Results tions nvelope ementation ERIEL INFORMATIQUE, PLOM BERIE ET CLIMATISATION PO UR LE PROJET PERSE ZR-SPACE-305975-NC-RFQ / Contrat avec un assureur ma Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl IDA / 66920 Post Limited 0.00 2022-07-30 2022-09-24 2023-03-23 ladie pour la prise en charge Systems for Results tions nvelope ementation des soins médicaux des mem bres de l'ECP PERSE ZR-SPACE-314511-NC-RFQ / RECRUTEMENT D'UNE SOCIE Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl IDA / 66920 Post Limited 0.00 2022-09-25 2022-11-20 2023-05-19 TE DE GARDIENNAGE POUR L Systems for Results tions nvelope ementation ES BUREAUX DU PERSE A KIN SHASA ZR-SPACE-326748-NC-RFQ / Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl PRODUCTION D'UN FILM DE S IDA / 66920 Post Limited 0.00 2022-11-30 2023-01-25 2023-07-24 Systems for Results tions nvelope ementation ENSIBILISATION AUX VBG/EA S/HS ET MGP CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-SPACE-187618-CS-CQS / Component 3: Strengthening Consultant Qualifi Pending Impleme Sélection de la firme pour la IDA / 66920 Post Open - National 0.00 2021-02-09 2021-03-02 2021-04-15 2021-05-15 2021-06-19 2023-06-09 Systems for Results cation Selection ntation revue du Plan de Travail Ann uel (PTA) ZR-SPACE-191896-CS-CQS / Sélection du Cabinet pour le Component 3: Strengthening Consultant Qualifi IDA / 66920 Post Open - National 96,825.08 Completed 2020-09-15 2020-09-28 2020-10-06 2020-11-03 2020-11-02 2020-11-10 2020-12-09 2020-12-01 2021-01-30 2021-01-30 2021-10-28 recrutement du personnel clé Systems for Results cation Selection de l'équipe de gestion du pro jet ZR-SPACE-198450-CS-CQS / Sélection du Cabinet Firme l' Component 3: Strengthening Consultant Qualifi Audit externe du Programme IDA / 66920 Post Limited 106,350.00 Signed 2020-10-08 2020-10-06 2020-10-22 2020-11-02 2020-10-29 2020-11-12 2020-11-19 2020-11-23 2020-12-19 Systems for Results cation Selection des Dépenses Eligibles (EEP) au 30 novembre 2020 ZR-SPACE-187535-CS-UN / S élection de l'Agence des Nati Component 3: Strengthening UN Agencies (Dire ons Unies pour la mise en œ IDA / 66920 Prior Direct 15,000,000.00 Signed 2020-11-03 2021-01-17 2020-11-10 Systems for Results ct) uvre du programme pilote " é coles sécurisées et inclusives " : UNFPA ZR-SPACE-221809-CS-QCBS / Cabinet d'Assistance Techni Component 3: Strengthening Quality And Cost- Open - Internationa Under Implement que pour appuyer la mise en IDA / 66920 Post 0.00 2021-03-05 2021-03-23 2021-03-19 2021-06-25 2021-04-16 2021-05-14 2021-05-28 2021-06-25 2021-07-30 2022-07-30 Systems for Results Based Selection l ation oeuvre de l'ILD 5 et les activ ités de la Composante 3.2 lié es au MGP et l'EC ZR-SPACE-223392-CS-QCBS / Sélection du Cabinet d'assis tance technique chargé d'ap Component 3: Strengthening Quality And Cost- Open - Internationa Under Implement IDA / 66920 Post 0.00 2021-03-10 2021-03-23 2021-03-31 2021-06-25 2021-04-28 2021-05-26 2021-06-25 2021-07-30 2021-09-03 2022-09-03 puyer les activités liées aux I Systems for Results Based Selection l ation LD 2,3,6 et 7 et de renforcer les Directions responsables d e ces ILD ZR-SPACE-221808-CS-QCBS / Sélection du Cabinet / ONG d'Assistance technique pour Component 3: Strengthening Consultant Qualifi Open - Internationa Under Implement appuyer les activités suivant IDA / 66920 Post 0.00 2021-03-22 2021-03-29 2021-04-12 2021-04-08 2021-05-26 2021-06-19 2021-06-09 2021-11-10 2021-07-14 2022-01-10 Systems for Results cation Selection l ation es de la Composante 3.1: ren forcer le SIGE et entreprendr e une revue fonctionnelle de la DIGE. Page 3 ZR-SPACE-226130-CS-QBS / Sélection du Cabinet / ONG d Component 3: Strengthening Quality Based Sel Open - Internationa Under Implement 'Assistance technique pour le IDA / 66920 Post 0.00 2021-04-01 2021-04-01 2021-04-22 2021-04-07 2021-06-05 2021-07-07 2021-07-03 2021-08-02 2021-09-01 2021-10-06 2022-10-06 Systems for Results ection l ation s activités de Communication ( y compris vis-à-vis du MGP) ZR-SPACE-241434-CS-QCBS / Sélection d'un Cabinet pour la formation, sensibilisation e Component 3: Strengthening Quality And Cost- Open - Internationa IDA / 66920 Post 0.00 Canceled 2021-06-29 2021-08-05 2021-07-20 2021-08-09 2021-08-17 2021-09-14 2021-09-15 2021-10-13 2021-11-17 2023-11-07 t suivi sur les Violences Basé Systems for Results Based Selection l es sur le Genre (VBG) au nive au des Points Focaux MGP/ P ERSE ZR-SPACE-187608-CS-QCBS / Sélection des firmes pour la Component 3: Strengthening Quality And Cost- Open - Internationa réalisation des reformes du s IDA / 66920 Prior 0.00 Canceled 2020-08-31 2020-09-21 2020-11-04 2020-12-02 2021-01-01 2021-02-05 2021-03-12 2023-03-02 Systems for Results Based Selection l ystème d'enseignement prim aire et l'amélioration de la go uvernance ZR-SPACE-241554-CS-QCBS / Sélection du Consultant Fir me chargé (i) de la Vérificati Component 3: Strengthening Quality And Cost- Under Implement on des indicateurs Liés au Dé IDA / 66920 Post Open - National 0.00 2021-06-29 2021-08-02 2021-07-20 2021-08-09 2021-08-04 2021-09-01 2021-09-15 2021-10-13 2021-11-10 2022-11-10 Systems for Results Based Selection ation caissements, (ii) de l'audit de s Dépenses Eligibles au Progr amme (DEP) et (iii) de l'audit financier des comptes du pro jet ZR-SPACE-187612-CS-QCBS / Sélection de la firme pour la vérification des Indicateurs Li Component 3: Strengthening Quality And Cost- Open - Internationa IDA / 66920 Prior 0.00 Canceled 2020-09-10 2020-10-01 2020-11-14 2020-12-12 2021-01-11 2021-02-15 2021-03-22 2024-03-21 és aux Décaissements ( ILD) Systems for Results Based Selection l et de l'Audit externe du Progr amme des Dépenses Eligible s (EEP) et du SECOPE ZR-SPACE-221810-CS-QCBS / Un Cabinet d'Assistance Tec Component 3: Strengthening Quality And Cost- Open - Internationa IDA / 66920 Post 0.00 Canceled 2021-03-05 2021-04-01 2021-03-19 2021-04-08 2021-04-16 2021-05-14 2021-05-28 2021-06-25 2021-07-23 2022-07-23 hnique pour le suivi par des t Systems for Results Based Selection l iers des autres assistances te chniques ZR-SPACE-246958-CS-CQS / Component 3: Strengthening Consultant Qualifi Under Implement ASSISTANCE TECHNIQUE PO IDA / 66920 Post Open - National 0.00 2021-08-12 2021-08-05 2021-08-26 2021-10-09 2021-10-23 2021-11-27 2022-05-26 Systems for Results cation Selection ation UR L'EVALUATION SOCIALE D U PROJET PERSE ZR-SPACE-296511-CS-QCBS / Recrutement d'un Consulta nt cabinet en soutien de la C Component 1: Enabling Free Quality And Cost- Open - Internationa Pending Impleme omposante 1 (LDs2&3), de la IDA / 66920 Prior 0.00 2022-06-06 2022-06-27 2022-08-10 2022-09-07 2022-10-07 2022-11-11 2022-12-16 2023-12-16 Access for All Based Selection l ntation Composante 2 5ILDs 6&7) et de la Composante 3.1 (Elabo ration et contrôle du budget ) pour le Projet PERSE ZR-SPACE-296505-CS-CQS / Recrutement d'un Consultant Cabinet chargé d'Assistance Technique en soutien à la for Component 3: Strengthening Consultant Qualifi Under Implement mation des COGES, à la Com IDA / 66920 Prior Limited 0.00 2022-06-02 2022-07-25 2022-06-16 2023-08-09 2022-07-16 2022-08-20 2023-02-16 Systems for Results cation Selection ation posante3.2 (Engagement des Citoyens et Mécanisme de G estion des Plaintes) et de la Composante 3.1 (Elaboration et contrôle du budget) ZR-SPACE-305078-CS-QCBS / Recrutement d'un consultan t Cabinet d'Assistance Techni que chargé d'appuyer, dans l Component 3: Strengthening Quality And Cost- Under Implement IDA / 66920 Prior Open - National 0.00 2022-08-05 2022-08-26 2022-10-09 2022-11-06 2022-12-06 2023-01-10 2023-02-14 2024-02-14 e cadre du projet PERSE, la r Systems for Results Based Selection ation ationalisation des écoles, bur eaux gestionnaires et service s du MEPST ainsi que du proc essus de leur création ZR-SPACE-305103-CS-QCBS / Recrutement d'un Consulta nt Cabinet d'Assistance Tech nique chargé d'appuyer le M Component 3: Strengthening Quality And Cost- Under Implement IDA / 66920 Prior Open - National 0.00 2022-08-08 2022-08-29 2022-10-12 2022-11-09 2022-12-09 2023-01-13 2023-02-17 2024-02-17 EPST dans la mise en place d Systems for Results Based Selection ation 'un nouveau système de recr utement, transparent, objecti f et basé sur l'équité, d'ensei gnants et Directeurs d'école primaire ZR-SPACE-307961-CS-QCBS / RECRUTEMENT D'UN CABIN Component 3: Strengthening Quality And Cost- Under Implement ET D'AUDIT COMPTABLE ET F IDA / 66920 Post Open - National 0.00 2022-09-05 2022-12-15 2022-09-26 2022-11-09 2022-12-07 2023-01-06 2023-02-10 2023-03-17 2024-03-16 Systems for Results Based Selection ation INANCIER DU PERSE, EXERCI CES 2022,2023 ET 2024 ZR-SPACE-326745-CS-CQS / RECRUTEMENT D’UN CONSU LTANT (FIRME) CHARGE (I) D E L’ELABORATION DU RAPPO Component 3: Strengthening Consultant Qualifi Under Implement IDA / 66920 Post Open - National 0.00 2022-11-21 2023-02-14 2022-12-12 2023-01-25 2023-02-24 2023-03-31 2023-09-27 RT DE CERTIFICATION DE L’A Systems for Results cation Selection ation TTEINTE DE L’INDICATEUR LI E AU DECAISSEMENT (ILD) ET (II) DE L’AUDIT DES DEPENSE S ELIGIBLES AU PROGRAMME (DEP) ZR-SPACE-359741-CS-QCBS / RECRUTEMENT D'UN CONS ULTANT (FIRME) CHARGE (I) DE L'ELABORATION DU RAPP Component 3: Strengthening Quality And Cost- Pending Impleme IDA / 66920 Post Open - National 0.00 2023-05-08 2023-05-29 2023-07-12 2023-08-09 2023-09-08 2023-10-13 2023-11-17 2024-11-16 ORT DE CERTIFICATION DE L' Systems for Results Based Selection ntation ATTEINTE DE L'INDICATEUR L IE AU DECAISSEMENT (ILD) E T (II) DE L'AUDIT DES DEPEN SES ELIGIBLES AU PROGRAM ME (DEP) ZR-SPACE-359742-CS-QCBS / Sélection du Prestataire Tier s chargé du suivi des activité Component 3: Strengthening Quality And Cost- Under Implement IDA / 66920 Post Open - National 0.00 2023-05-15 2023-10-12 2023-06-05 2023-07-19 2023-08-16 2023-09-15 2023-10-20 2023-11-24 2024-11-23 s de renforcement des capaci Systems for Results Based Selection ation tés dans le cadre de la mise en oeuvre du projet PERSE ZR-SPACE-380197-CS-CQS / Recrutement d'un Consultant Cabinet chargé de la vérificat ion de l'atteinte du RLD 4.3: Component 2: Laying the Fo Consultant Qualifi Under Implement IDA / 66920 Post Open - National 0.00 2023-09-11 2023-09-18 2023-09-25 2023-11-08 2023-11-22 2023-12-27 2024-06-24 Evaluation des connaissance undations for Quality cation Selection ation s du personnel de l'école pri maire publique sur la formati on intégrée portant sur une é cole sécurisée et inclusive Page 4 ZR-SPACE-380198-CS-CQS / Recrutement d'un Consultant Component 2: Laying the Fo Consultant Qualifi Under Implement IDA / 66920 Post Open - National 0.00 2023-09-13 2023-09-19 2023-09-27 2023-11-10 2023-11-24 2023-12-29 2024-06-26 Cabinet chargé de la vérificat undations for Quality cation Selection ation ion de l'atteinte des RLDs 6.2 , 7.2 et 7.3 ZR-SPACE-415631-CS-CQS / Recrutement d'un Prestataire de services pour la mise en œuvre des activités de forma Component 2: Laying the Fo Consultant Qualifi Pending Impleme tion et de communication po IDA / 66920 Post Open - National 0.00 2024-03-12 2024-03-26 2024-05-09 2024-05-23 2024-06-27 2024-12-24 undations for Quality cation Selection ntation ur la prévention et la répons e aux Violences Basées sur le Genre (VBG), y compris l'expl oitation et les abus sexuels ( EAS) et le harcèlement . ZR-SPACE-415632-CS-CQS / Recrutement d'un Prestataire Component 2: Laying the Fo Consultant Qualifi Pending Impleme Tiers Chargé du Suivi des act IDA / 66920 Post Open - National 0.00 2024-03-14 2024-03-28 2024-05-11 2024-05-25 2024-06-29 2024-12-26 undations for Quality cation Selection ntation ivités de renforcement des c apacités dans le cadre de la mise en œuvre du PERSE ZR-SPACE-418182-CS-CQS / Recrutement d'un Consultant Component 2: Laying the Fo Consultant Qualifi Pending Impleme Cabinet Chargé de l'audit co IDA / 66920 Post Limited - National 0.00 2024-03-21 2024-03-21 2024-04-10 2024-06-11 2024-07-10 undations for Quality cation Selection ntation mptable et financier du Proje t PERSE pour les exercices 2 022,2023 et 2024 INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-SPACE-187600-CS-INDV / Component 3: Strengthening Individual Consult Sélection des consultants ( 2) IDA / 66920 Post Open 0.00 Signed 2020-09-07 2020-09-28 2020-10-26 2021-08-11 2020-11-16 2021-08-16 2020-12-21 2021-08-16 2022-12-11 Systems for Results ant Selection chargés du suivi de l'engage ment citoyen ZR-SPACE-187601-CS-INDV / Sélection des consultants nat ionaux ( 10) au niveau provin Component 3: Strengthening Individual Consult Under Implement IDA / 66920 Post Open 0.00 2020-09-15 2020-09-17 2020-11-03 2020-11-24 2020-12-29 2022-12-19 cial pour la supervision, le so Systems for Results ant Selection ation utien et le suivi des reformes du projet : plusieurs petits m archés ZR-SPACE-187573-CS-INDV / Sélection du spécialiste resp Component 3: Strengthening Individual Consult onsable pour appuyer le renf IDA / 66920 Post Open 0.00 Signed 2020-09-10 2020-09-28 2020-10-29 2021-08-11 2020-11-19 2021-08-16 2020-12-24 2021-08-16 2022-12-14 Systems for Results ant Selection orcement des réseaux d'écol es et Bureaux gestionnaires ZR-SPACE-187592-CS-INDV / Component 3: Strengthening Individual Consult Sélection du Spécialiste char IDA / 66920 Post Open 0.00 Signed 2020-09-14 2020-09-28 2020-11-02 2021-06-23 2020-11-23 2021-08-15 2020-12-28 2021-08-16 2022-12-18 Systems for Results ant Selection gé du suivi-évaluation du pro jet ZR-SPACE-187590-CS-INDV / Component 3: Strengthening Individual Consult Under Implement Sélection du Spécialiste en s IDA / 66920 Post Open 0.00 2020-09-15 2020-09-30 2020-11-03 2020-11-24 2020-12-29 2022-12-19 Systems for Results ant Selection ation auvegardes sociales ZR-SPACE-187548-CS-INDV / Component 3: Strengthening Individual Consult Sélection du Coordonnateur IDA / 66920 Post Open 0.00 Signed 2020-09-14 2020-09-17 2020-11-02 2021-06-07 2020-11-16 2021-08-12 2020-12-14 2023-03-03 2022-12-04 Systems for Results ant Selection adjoint du projet PERSE ZR-SPACE-187555-CS-INDV / Sélection d'un Consultant int Component 3: Strengthening Individual Consult Under Implement ernational pour appuyer les s IDA / 66920 Post Open 0.00 2020-09-10 2020-09-28 2020-10-29 2020-11-12 2020-12-17 2021-02-27 Systems for Results ant Selection ation ystèmes d'information et de paiement des salaires ZR-SPACE-187561-CS-INDV / Sélection du spécialiste resp Component 3: Strengthening Individual Consult Under Implement IDA / 66920 Post Open 0.00 2020-09-13 2021-02-05 2020-11-01 2020-11-22 2020-12-27 2022-12-17 onsable pour le recrutement Systems for Results ant Selection ation basé sur le mérite ZR-SPACE-187576-CS-INDV / Sélection d'un Consultant int Component 3: Strengthening Individual Consult Pending Impleme IDA / 66920 Post Open 0.00 2020-09-17 2020-11-05 2020-11-19 2020-12-24 2022-12-14 ernational pour la gestion fin Systems for Results ant Selection ntation ancière du projet ZR-SPACE-187579-CS-INDV / Sélection du Consultant natio Component 3: Strengthening Individual Consult IDA / 66920 Post Open 0.00 Signed 2020-09-15 2020-09-15 2020-11-03 2023-08-18 2020-11-24 2023-08-21 2020-12-29 2021-08-16 2022-12-19 nal spécialiste en gestion fin Systems for Results ant Selection ancière du projet ZR-SPACE-187580-CS-INDV / Component 3: Strengthening Individual Consult Sélection du Spécialiste en P IDA / 66920 Post Open 0.00 Signed 2020-09-10 2021-01-26 2020-10-29 2023-07-26 2020-11-12 2021-09-28 2020-12-17 2021-10-01 2022-12-07 Systems for Results ant Selection assation des marchés ZR-SPACE-187582-CS-INDV / Component 3: Strengthening Individual Consult Sélection du Spécialiste char IDA / 66920 Post Open 0.00 Signed 2020-09-15 2020-09-28 2020-11-03 2021-08-11 2020-11-24 2021-08-16 2020-12-29 2021-08-16 2022-12-19 Systems for Results ant Selection gé des sauvegardes environn ementales ZR-SPACE-187575-CS-INDV / Sélection du spécialiste resp Component 3: Strengthening Individual Consult IDA / 66920 Post Open 0.00 Signed 2020-09-14 2020-12-17 2020-11-02 2022-08-11 2020-11-23 2021-08-16 2020-12-28 2021-08-16 2022-12-18 onsable pour appuyer la gest Systems for Results ant Selection ion des finances publiques ZR-SPACE-187620-CS-CDS / Component 3: Strengthening Sélection du Coordonnateur IDA / 66920 Post Direct Selection Direct 7,500.00 Signed 2020-09-10 2020-10-16 2020-09-20 2021-01-03 2020-11-01 2021-01-13 2022-10-22 Systems for Results du Projet : Prof Valère MUNS YA ZR-SPACE-209760-CS-CDS / Component 3: Strengthening Sélection chargée de Passati IDA / 66920 Post Direct Selection Direct 7,500.00 Signed 2020-12-14 2021-02-10 2020-12-18 2020-12-30 2020-12-29 2021-01-10 2021-06-27 Systems for Results on des Marchés : Fleur SHWE KA ZR-SPACE-216049-CS-CDS / Sélection du Consultant Spéc Component 3: Strengthening IDA / 66920 Post Direct Selection Direct 27,000.00 Signed 2021-01-26 2021-02-10 2021-02-05 2020-12-30 2021-02-26 2021-01-22 2021-08-25 ialiste en Communication de Systems for Results l'ECP PERSE: Mme BIBICHE M ODJAKA ZR-SPACE-216061-CS-CDS / Component 3: Strengthening Sélection du Spécialiste en V IDA / 66920 Post Direct Selection Direct 36,000.00 Signed 2021-01-26 2021-02-10 2021-02-05 2020-12-30 2021-03-05 2021-01-22 2021-09-01 Systems for Results BG : Jeanine Gabrielle NGUN GU Page 5 ZR-SPACE-221812-CS-CDS / Sélection du Consultant Princ ipal ( avec son équipe de 4 e Component 3: Strengthening xperts) pour la conduite des IDA / 66920 Post Direct Selection Direct 93,500.00 Completed 2021-03-08 2021-03-10 2021-03-18 2021-03-15 2021-04-08 2021-04-12 2021-07-07 2021-10-28 Systems for Results opérations de géolocalisation des écoles primaires dans le cadre du PERSE : Roger VIBIL A ZR-SPACE-221817-CS-INDV / Component 3: Strengthening Individual Consult Under Implement Assistant ponctuel logisticien IDA / 66920 Post Direct 0.00 2021-02-25 2021-02-26 2021-03-07 2021-03-12 2021-03-22 2021-06-20 Systems for Results ant Selection ation : ARLY MANGELELE BOKOMB E ZR-SPACE-223393-CS-INDV / Consultant Architecte chargé de mener les études pour la r Component 3: Strengthening Individual Consult Under Implement IDA / 66920 Post Limited 0.00 2021-03-10 2021-01-20 2021-03-15 2021-04-05 2021-05-03 2021-08-01 éhabilitation des bureaux du Systems for Results ant Selection ation SPACE qui serviront des bure aux définitifs pour le projet P ERSE ZR-SPACE-223394-CS-INDV / Component 3: Strengthening Individual Consult Under Implement Sélection du Comptable pour IDA / 66920 Post Open 0.00 2021-03-10 2021-03-23 2021-04-28 2021-05-19 2021-06-23 2021-12-20 Systems for Results ant Selection ation le projet PERSE ZR-SPACE-221823-CS-CDS / Recrutement du Prestataire p Component 3: Strengthening IDA / 66920 Post Direct Selection Direct 830,726.00 Signed 2021-03-21 2021-03-03 2021-03-31 2021-03-25 2021-04-29 2021-07-11 2021-10-26 our le Développement de l'ap Systems for Results plication ALLO ECOLE : INFOS ET ZR-SPACE-231137-CS-INDV / RENOUVELLEMENT CONTRAT Component 3: Strengthening Individual Consult CHARGEE DE PASSATION DE IDA / 66920 Post Direct 0.00 Signed 2021-04-22 2021-03-20 2021-05-02 2021-03-26 2021-05-23 2021-03-30 2021-06-27 2021-04-01 2022-06-27 Systems for Results ant Selection S MARCHES MADAME FLEUR SHWEKA (12 MOIS) ZR-SPACE-234473-CS-INDV / Sélection du Consultant char gé de l'élaboration du Plan d Component 3: Strengthening Individual Consult Under Implement e Gestion Environnemental e IDA / 66920 Post Limited 0.00 2021-06-30 2021-08-05 2021-07-05 2021-07-19 2021-08-09 2021-10-08 Systems for Results ant Selection ation t Social Générique (PGES) po ur le projet PERSE ( Le volet Social étant prépondérant da ns le cadre de ce marché) ZR-SPACE-241555-CS-INDV / Renouvellement du Contrat d Component 3: Strengthening Individual Consult Under Implement IDA / 66920 Post Direct 0.00 2021-06-27 2021-05-27 2021-07-07 2021-07-14 2021-07-28 2022-07-28 e la Chargée de logistique- A Systems for Results ant Selection ation RLLY MANGELELE ( pour 12 mois) ZR-SPACE-187591-CS-INDV / Sélection du Spécialiste dans Component 3: Strengthening Individual Consult IDA / 66920 Post Open 0.00 Canceled 2020-09-09 2020-10-28 2020-11-18 2020-12-23 2022-12-13 la gestion des Violences Basé Systems for Results ant Selection es sur le Genre ( VBG) ZR-SPACE-248688-CS-INDV / Component 3: Strengthening Individual Consult Sélection spécialiste en plani IDA / 66920 Post Open 0.00 Signed 2021-08-17 2020-09-17 2021-10-05 2023-08-24 2021-10-26 2023-08-24 2021-11-30 2021-08-16 2022-11-30 Systems for Results ant Selection fication et vérification du proj et PERSE ZR-SPACE-248700-CS-INDV / Component 3: Strengthening Individual Consult Sélection Expert en communi IDA / 66920 Post Open 0.00 Signed 2021-08-17 2021-08-17 2021-10-05 2021-07-23 2021-10-26 2021-07-23 2021-11-30 2021-08-16 2022-05-29 Systems for Results ant Selection cation Projet PERSE ZR-SPACE-249050-CS-INDV / Sélection d'un Spécialiste de Component 3: Strengthening Individual Consult IDA / 66920 Post Limited 0.00 Signed 2021-09-14 2020-11-26 2021-09-19 2023-08-18 2021-10-03 2023-08-21 2021-10-24 2021-08-16 2022-10-24 s Systèmes d’information de Systems for Results ant Selection gestion de l’éducation et du paiement (SIGEP) ZR-SPACE-241557-CS-CDS / Sélection du Prestataire Tiers chargé du suivi des activités Component 3: Strengthening IDA / 66920 Post Direct Selection Direct 0.00 Canceled 2021-09-14 2021-09-24 2021-11-12 2022-11-12 de renforcement des capacit Systems for Results és dans le cadre de la mise e n oeuvre du projet PERSE : O NG CORDAID ZR-SPACE-231135-CS-INDV / RENOUVELLEMENT CONTRAT Component 3: Strengthening Individual Consult Under Implement SPECIALISTE EN VIOLENCES IDA / 66920 Post Direct 0.00 2021-06-30 2021-03-01 2021-07-10 2021-07-31 2021-09-04 2023-08-25 Systems for Results ant Selection ation BASEES SUR LE GENRE : MA DAME JEANINE NGUNGU KWA TE (12 MOIS) ZR-SPACE-261331-CS-INDV / Component 3: Strengthening Individual Consult Under Implement SELECTION CAISSIER(RE) PO IDA / 66920 Post Open 0.00 2021-11-03 2022-02-10 2021-12-22 2022-01-12 2022-02-16 2022-08-15 Systems for Results ant Selection ation UR LE PROJET PERSE ZR-SPACE-261334-CS-INDV / Component 3: Strengthening Individual Consult SELECTION D'UN(E) ASSISTA IDA / 66920 Post Open 0.00 Completed 2021-11-03 2022-02-10 2021-12-22 2023-08-22 2022-01-12 2023-08-22 2022-02-16 2022-08-29 2022-08-15 2023-08-29 Systems for Results ant Selection NT(E) ADMINISTRATIF POUR L E PROJET PERSE ZR-SPACE-261338-CS-INDV / SELECTION D'UN(E) ASSISTA Component 3: Strengthening Individual Consult IDA / 66920 Post Open 0.00 Signed 2021-11-03 2022-02-10 2021-12-22 2023-08-22 2022-01-12 2023-08-22 2022-02-16 2022-08-29 2022-08-15 NT(E) AU PROGRAMME POUR Systems for Results ant Selection LE PROJET PERSE ZR-SPACE-262236-CS-INDV / SELECTION DES CHAUFFEUR Component 3: Strengthening Individual Consult Under Implement IDA / 66920 Post Limited 0.00 2021-11-16 2022-02-10 2021-11-21 2023-09-06 2021-12-12 2022-01-16 2022-07-15 S POUR LE PROJET PERSE A K Systems for Results ant Selection ation INSHASA (5 CONTRATS POUR 12 MOIS) ZR-SPACE-272626-CS-INDV / RECRUTEMENT D'UN CONSUL Component 3: Strengthening Individual Consult Pending Impleme TANT INDIVIDUEL EN QUALIT IDA / 66920 Post Open 0.00 2022-01-11 2022-03-01 2022-03-22 2022-04-26 2022-10-23 Systems for Results ant Selection ntation E DE SUPERVISEUR PROVINCI AL BASE A KINSHASA ZR-SPACE-262238-CS-INDV / SELECTION DES ASSISTANTS Component 3: Strengthening Individual Consult Under Implement ADMINISTRATIFS ET FINANCI IDA / 66920 Post Open 0.00 2021-11-16 2022-03-09 2022-01-04 2022-01-25 2022-03-01 2022-08-28 Systems for Results ant Selection ation ERS (10 CONTRATS) POUR LE PROJET PERSE EN PROVINCE (12 MOIS) Page 6 ZR-SPACE-284618-CS-CDS / CONTRACTUALISATION AVEC LE CABINET PriceWatherHous eCoopers POUR LA VERIFICA TION DES INDICATEURS LIES Component 3: Strengthening Under Implement IDA / 66920 Prior Direct Selection Direct 0.00 2022-03-15 2022-03-18 2022-03-25 2022-03-19 2022-05-29 2022-11-25 AUX DECAISSEMENTS (ILD) E Systems for Results ation T L'AUDIT DES DEPENSES ELI GIBLES AU PROGRAMME (DE P) DANS LES PROVINCES DU KWILU, KONGO CENTRAL, KI NSHASA, LOMAMI, KASAÏ ORI ENTAL ZR-SPACE-284619-CS-CDS / CONTRACTUALISATION AVEC LE CABINET MGI STRONG NK V POUR L'AUDIT FINANCIER Component 3: Strengthening Under Implement DES COMPTES DU PROJET PO IDA / 66920 Post Direct Selection Direct 0.00 2022-03-15 2022-03-18 2022-03-25 2022-03-21 2022-05-29 2022-11-25 Systems for Results ation UR LES 3 EXERCICES SUIVAN TS: (1) JUIN 2020 AU 31 DEC EMBRE 2020; (2) 01 JANVIER 2021 AU 31 DECEMBRE 2021 ; (3) 01 JANVIER 22 AU 31 DE CEMBRE 2022 ZR-SPACE-284617-CS-CDS / CONTRACTUALISATION AVEC LE CABINET COFIMA POUR LA VERIFICATION DES INDICATE Component 3: Strengthening Under Implement URS LIES AUX DECAISSEMEN IDA / 66920 Prior Direct Selection Direct 0.00 2022-03-15 2022-03-18 2022-03-25 2022-03-19 2022-05-29 2022-11-25 Systems for Results ation TS (ILD) ET L'AUDIT DES DEP ENSES ELIGIBLES AU PROGR AMME (DEP) DANS LES PROVI NCES DU NORD-KIVU, SUD-KI VU, ITURI, KASAÏ, kASAÏ CENT RAL ZR-SPACE-286586-CS-CDS / RENOUVELLEMENT CONTRAT Component 3: Strengthening Under Implement CHARGEE DE PASSATION DE IDA / 66920 Post Direct Selection Direct 0.00 2022-05-20 2022-03-28 2022-05-30 2022-08-03 2023-01-30 Systems for Results ation S MARCHES DU PROJET PERS E MADAME FLEUR SHWEKA ( 12 MOIS) ZR-SPACE-295474-CS-INDV / Recrutement d'un Consultant individuel pour l'accompagne ment de la cellule du Projet d Component 3: Strengthening Individual Consult Under Implement ans l'évaluation et coordinati IDA / 66920 Post Limited 0.00 2022-05-20 2022-07-20 2022-05-25 2022-06-15 2022-07-20 2023-01-16 Systems for Results ant Selection ation on des travaux réalisés par le s cabinets chargés de l'audit des Dépenses DEP et du cont rôle des indicateurs de réalis ation ILD/RLD ZR-SPACE-300402-CS-INDV / RECRUTEMENT D'UN ASSIST Component 3: Strengthening Individual Consult IDA / 66920 Post Limited 0.00 Signed 2022-09-09 2022-08-31 2022-09-14 2023-09-04 2022-10-05 2023-09-04 2022-11-09 2022-10-12 2023-05-08 ANT TECHNIQUE PROVINCIAL Systems for Results ant Selection BASE A KINSHASA ZR-SPACE-303555-CS-CDS / CONSULTANT PONCTUEL PO Component 3: Strengthening UR UN APPUI TECHNIIQUE A L IDA / 66920 Post Direct Selection Direct - National 0.00 Signed 2022-08-11 2022-07-29 2022-08-21 2023-09-11 2022-10-25 2022-07-28 2023-04-23 Systems for Results A PASSATION DES MARCHES DU PROJET PERSE ( Mr LAURE NT TSHIMBIYE) ZR-SPACE-304959-CS-CDS / Renouvellement du contrat d Component 3: Strengthening Under Implement IDA / 66920 Post Direct Selection Direct - National 0.00 2022-07-19 2022-07-28 2022-07-29 2022-10-02 2023-03-31 e la chargée de la logistique Systems for Results ation (Madame Arlly MANGELELE) pour 12 mois ZR-SPACE-304955-CS-INDV / Recrutement de 10 chauffeur Component 3: Strengthening Individual Consult Pending Impleme IDA / 66920 Post Limited 0.00 2022-07-19 2022-07-24 2022-08-14 2022-09-18 2023-03-17 s pour les véhicules des ante Systems for Results ant Selection ntation nnes provinciales du Projet ZR-SPACE-300117-CS-INDV / Component 3: Strengthening Individual Consult RECRUTEMENT DU SPECIALIS IDA / 66920 Post Limited 0.00 Signed 2022-08-26 2022-09-13 2022-08-31 2023-08-30 2022-09-21 2023-08-15 2022-10-26 2022-10-12 2023-04-24 Systems for Results ant Selection TE PROVINCIAL POUR LE NOR D-KIVU ZR-SPACE-314053-CS-INDV / RECRUTEMENT D’UN(E) ASSI STANT(E) SPECIALISTE EN VI Component 3: Strengthening Individual Consult Under Implement IDA / 66920 Post Limited 0.00 2022-09-19 2022-12-20 2022-09-24 2022-10-15 2022-11-19 2023-05-18 OLENCES BASEES SUR LE GE Systems for Results ant Selection ation NRE AU SEIN DE L’EQUIPE DE CO ORDINATION DU PROJET ZR-SPACE-326740-CS-CDS / CONTRACTUALISATION AVEC LE CABINET PWC POUR LA MI SSION D'AUDIT DES DEPENS Component 3: Strengthening Pending Impleme ES ELIGIBLES AU PROGRAMM IDA / 66920 Post Direct Selection Direct - National 0.00 2022-11-21 2022-12-01 2023-02-04 2023-08-03 Systems for Results ntation E (DEP) POUR LA PERIODE A LLANT DU 1ER JANVIER AU 3 1 DECEMBRE 2022 ET VERIFI CATION DE L'INDICATEUR LIE AU DECAISSEMENT (ILD 5.2) ZR-SPACE-326743-CS-CDS / CONTRACTUALISATION AVEC LE CABINET COFIMA POUR LA MISSION D'AUDIT DES DEPE Component 3: Strengthening Pending Impleme NSES ELIGIBLES AU PROGRA IDA / 66920 Post Direct Selection Direct - National 0.00 2022-11-21 2022-12-01 2023-02-04 2023-08-03 Systems for Results ntation MME (DEP) POUR LA PERIOD E ALLANT DU 1ER JANVIER A U 31 DECEMBRE 2022 ET VE RIFICATION DE L'INDICATEUR LIE AU DECAISSEMENT (ILD 5 .2) ZR-SPACE-327666-CS-INDV / RECRUTEMENT D'UN ASSIST Component 3: Strengthening Individual Consult Under Implement IDA / 66920 Post Limited 0.00 2022-11-28 2022-12-20 2022-12-03 2022-12-24 2023-01-28 2023-07-27 ANT ADMINISTRATIF ET FINA Systems for Results ant Selection ation NCIER POUR LE KONGO CENT RAL ZR-SPACE-336148-CS-INDV / Component 3: Strengthening Individual Consult Under Implement RECRUTEMENT DU COORDO IDA / 66920 Post Open - National 0.00 2023-02-01 2023-02-22 2023-03-22 2023-04-12 2023-05-17 2023-11-13 Systems for Results ant Selection ation NNATEUR ADJOINT DU PERSE ZR-SPACE-343004-CS-CDS / CONTRACTUALISATION AVEC Component 3: Strengthening Pending Impleme IDA / 66920 Post Direct Selection Direct - National 0.00 2023-02-28 2023-03-10 2023-05-14 2023-11-10 LA FIRME INFOSET POUR L'E Systems for Results ntation XTENSION DU CENTRE D'APP EL ALLO-ECOLE ZR-SPACE-376606-CS-INDV / Recrutement d'un deuxième Component 3: Strengthening Individual Consult Under Implement IDA / 66920 Post Limited 0.00 2023-09-18 2023-10-12 2023-09-23 2023-10-14 2023-11-18 2024-05-16 Spécialiste en Passation des Systems for Results ant Selection ation Marchés du Projet PERSE Page 7 ZR-SPACE-388164-CS-INDV / Recrutement d'un deuxième Component 3: Strengthening Individual Consult Pending Impleme IDA / 66920 Post Limited 0.00 2023-10-26 2023-10-31 2023-11-21 2023-12-26 2024-06-23 Responsable de Gestion Fina Systems for Results ant Selection ntation ncière du Projet PERSE ZR-SPACE-418775-CS-INDV / Component 2: Laying the Fo Individual Consult Under Implement Recrutement d'un Spécialiste IDA / 66920 Post Open - National 0.00 2024-05-09 2024-06-07 2024-06-20 2024-09-04 2024-06-30 2024-09-05 2024-07-19 2024-12-31 undations for Quality ant Selection ation chargé de la Communication du Projet ZR-SPACE-418779-CS-INDV / Component 2: Laying the Fo Individual Consult Under Implement IDA / 66920 Post Open - National 0.00 2024-05-09 2024-03-22 2024-06-20 2024-06-30 2024-07-19 2024-12-31 Recrutement d'un Auditeur In undations for Quality ant Selection ation terne ZR-SPACE-418785-CS-INDV / Component 2: Laying the Fo Individual Consult Under Implement Recrutement de deux (02) C IDA / 66920 Post Open - National 0.00 2024-05-15 2024-05-20 2024-06-26 2024-09-24 2024-07-03 2024-09-24 2024-07-22 2024-12-31 undations for Quality ant Selection ation omptables du Projet ZR-SPACE-418786-CS-INDV / Component 2: Laying the Fo Individual Consult Pending Impleme Recrutement d'un Chargé de IDA / 66920 Post Limited - National 0.00 2024-05-13 2024-05-27 2024-06-17 2024-07-08 2024-12-31 undations for Quality ant Selection ntation Passation des marchés ZR-SPACE-418788-CS-INDV / Component 2: Laying the Fo Individual Consult Pending Impleme IDA / 66920 Post Limited - National 0.00 2024-05-15 2024-05-29 2024-06-19 2024-07-10 2024-12-31 Recrutement d'un ITC junior undations for Quality ant Selection ntation du Projet ZR-SPACE-434351-CS-INDV / Recrutement d'un Spécialiste Component 3: Strengthening Individual Consult Under Implement IDA / 66920 Post Open - National 0.00 2024-07-08 2024-06-14 2024-08-12 2024-08-19 2024-09-09 2024-12-30 en Suivi-Evaluation et Rappor Systems for Results ant Selection ation tage pour le Projet PERSE ZR-SPACE-441075-CS-INDV / Component 3: Strengthening Individual Consult Under Implement Recrutement d'un Chargé de IDA / 66920 Post Limited - National 0.00 2024-07-25 2024-09-19 2024-07-30 2024-08-04 2024-08-23 2024-12-31 Systems for Results ant Selection ation Passation des Marchés (CPM) ZR-SPACE-450263-CS-CDS / Recrutement de Monsieur Pie rre Andrianne (Consultant In Component 3: Strengthening Under Implement IDA / 66920 Post Direct Selection Direct - National 0.00 2024-09-18 2024-09-19 2024-09-29 2024-09-24 2024-10-03 2024-12-31 dividuel) en charge de l'opti Systems for Results ation misation de la gestion de l'éd ucation primaire en Républiq ue Démocratique du Congo ZR-SPACE-452787-CS-CDS / Recrutement par Entente Dir Component 3: Strengthening Under Implement ecte de Monsieur Rémy MAN IDA / 66920 Post Direct Selection Direct - National 0.00 2024-09-30 2024-09-26 2024-10-06 2024-10-17 2024-12-31 Systems for Results ation DJO (Consultant Individuel) c omme Chef Comptable du PE RSE ZR-SPACE-456996-CS-INDV / Recrutement d'un Comptable Component 2: Laying the Fo Individual Consult Under Implement IDA / 66920 Post Open - National 0.00 2024-10-16 2024-10-17 2024-11-11 2024-11-16 2024-11-29 2024-12-31 pour le Projet d'Equité et de undations for Quality ant Selection ation Renforcement du système Ed ucatif "PERSE" ZR-SPACE-458006-CS-INDV / Recrutement d'un Spécialiste Component 3: Strengthening Individual Consult Pending Impleme IDA / 66920 Post Open - National 0.00 2024-10-31 2024-11-29 2024-12-04 2024-12-23 2025-12-31 en Suivi-Evaluation et Rappor Systems for Results ant Selection ntation tage pour le PERSE ZR-SPACE-458016-CS-INDV / Recrutement d'un (e) Spécial Component 3: Strengthening Individual Consult Pending Impleme IDA / 66920 Post Open - National 0.00 2024-10-31 2024-11-29 2024-12-04 2024-12-23 2025-12-31 iste en Violences Basées sur l Systems for Results ant Selection ntation e Genre (VBG) pour le PERSE Page 8