Climate Smart Management of Grassland Ecosystems Project Procurement Plan Annex: Procurement Plan Procurement Plan of Climate smart management of grassland ecosystems Project Project information: Country: The People’s Republic of China Borrower: The People’s Republic of China Project Name: Climate Smart Management of Grassland Ecosystems Project Loan/Credit No: TF0B1658 Project ID: P166853 Project Implementation Agency (PIA): Climate Smart Management of Grassland Ecosystems Project Management Office Date of the Procurement Plan: Original: Original: October 30, 2019; 1st Revision: July 27, 2020, 2nd Revision: Oct. 16, 2020; 3rd Revision: Jan. 28: 4th Revision: Feb. 4, 2021 Period covered by this Procurement Plan: 2021-2024 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. A. The Bank’s Standard Procurement Documents (SPDs): The Bank’s SPDs shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. B. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures (Tendering and Bidding Law of the Peoples’ Republic of China, i.e. TBL promulgated by its Order No. 21 dated August 30, 1999 and the Implementation Regulations of the TBL promulgated by its State Council Order No. 613 dated November 30, 2011 and any amendments thereof) may be used with the following conditions to meet the requirements for open competitive procurement of paragraph 5.4 of the Procurement Regulations: a. All procurement notices shall be published in a national newspaper of wide circulation, or on a widely-used website / electronic portal with free access. b. A minimum of thirty (30) days shall be given to Bidders between the date of such advertisement (or the date of availability of procurement documents, whichever is later and the deadline for the submission of bids). The advertisement and procurement documents 1 Climate Smart Management of Grassland Ecosystems Project Procurement Plan shall specify the deadline for the submission of bids. Potential Bidders shall be allowed to inspect and purchase procurement documents at any time prior to the deadline for the submission of bids. c. Any Bidder/Consultant should be eligible to participate in a procurement process and to be awarded a Bank-financed contract as defined in paragraphs 3.21, 3.22 and 3.23 of the Procurement Regulations. d. Bidders/Consultants shall be allowed to submit bids/proposals by mail or in person. Bidders/consultants shall not be mandatory required to be present at the bid/proposal opening session. e. Bidders should not be required to register as a condition for inspecting or purchasing procurement documents, submitting its bid or receiving contract award. Winning Bidders shall be given reasonable opportunity of registering (if required) before contract signing without any let or hindrance. Bidding shall not be restricted to any class of contractors. f. The winning bidder shall not be required, as a condition of award, to reduce its bid price No contract negotiation shall be permitted unless agreed in the procurement plan. g. No bid may be rejected solely on the basis that the bid price exceeds any cost estimate. Rejection of all bids or re-bidding shall not be allowed solely because the number of bids is less than three (3). Rebidding shall not take place without any sound justification. h. The Bank’s procurement documents for approaching the national market or any procurement document acceptable to the Bank shall be used. All procurement documents must require that bidders/consultants present a signed acceptance at the time of bidding or submitting a proposal, to be incorporated in any resulting contract, confirming application of and compliance with the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. i. The procurement documents shall disclose the newspaper and/or the electronic means in which the information on contract award shall be published. j. The contract award notification shall identify: (a) name and address of the Borrower’s Project Implementing Unit, (b) name and reference number of the contract being awarded and the selection method used (c) names of all Bidders/Consultants that submitted bids/proposals and their prices as read out at the bid opening meeting and as evaluated (d) names of all Bidders/ Consultants whose bids/proposals were rejected either as nonresponsive or as not meeting qualification criteria or were not evaluated, with the reasons therefor and (e) the name of the successful Bidder/Consultant, the final contract price, the contract duration and a summary of its scope. k.The Borrower shall implement an effective complaint mechanism allowing bidders or consultants to complain, and have their complaints handled and responded in a timely manner. Procurement documents should indicate the complaint mechanism procedure and provide the professional title and address of the officials to whom such protests should be sent. l. The Bank shall be allowed to review procurement documentation and activities related to the activities included in the procurement plan. C. Other national procurement arrangements: When other national procurement arrangements other than national open competitive procurement arrangements are applied 2 Climate Smart Management of Grassland Ecosystems Project Procurement Plan by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. A. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. B. Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations is not applicable. C. Domestic Preference as specified under paragraph 5.51 of the Procurement Regulations: Goods: Domestic Preference is not applicable. Works: Domestic Preference is not applicable. G. Other Relevant Procurement Information: Goods, Works and Non-Consulting Services: Prior Review Threshold: Procurement Decisions are subject to Prior Review by the Bank as stated in Annex II to the Procurement Regulations (July 2016, revised November 2017 and August 2018). Procurement Contract Value Procurement Method Bank Prior Review Category (US$) Goods & Non- ≥ 10 million International Open All contracts Consulting Competitive Procurement Services (International + Open) ≥ 0.5 National Open Competitive All contracts ≥ USD 4 million. million to < Procurement (RFB) 10 million (National + Open) < 0.5 Shopping (RFQ) N/A million Others DS (Direct Selection) All contracts ≥ USD 4 million. Works, Supply ≥ 40 million International Open All contracts & Installation Competitive Procurement (International + Open) ≥0.5 million National Open Competitive All contracts ≥ USD 15 to Procurement (RFB) million. < 40 million (National + Open) < 0.5 Shopping (RFQ) N/A million N/A DS (Direct Selection) All contracts ≥ USD 15million. 3 Climate Smart Management of Grassland Ecosystems Project Procurement Plan Notes: DS: Direct Selection N/A: Not Applicable 4 Climate Smart Management of Grassland Ecosystems Project Procurement Plan Procurement Packages with Methods and Time Schedule: Climate smart management of grassland ecosystems Project Procurement Plan (Goods and Non-Consulting Services) WB Estimated Cost Revie Schedule w Categor Rema No. Contract No. Contract Description Method Estimate Contra Durati y rks Prior/ d Bid ct on RMB USD Post Opening Signing (mont Date Date hs) laptop, color printers, cameras, equipment video cameras, camera drones, CSMG- needed for 50,000.0 RFQ/Limite 1-08- *6 1 G-01 publicity etc. that needed for the 340,000.00 Goods Post 01-05-2021 3 development of publicity 0 d/National 2021 production materials, Establishm Establishment of 6 village-level ent of 6 agricultural technology promotion village- platforms (computers, sound CSMG- level reinforcement equipment, 90,000.0 RFQ/Limite 1-08- 2 G-02 agricultural projector, curtains, printers, 612,000.00 Goods Post 01-05-2021 3 0 d/National 2021 technology training tables and chairs, promotion courseware, books, bookshelves, platforms etc.) Preparatio Preparation of popular Non- n of paper CSMG- science materials such as 45,000.0 Consultin RFQ/Limite 1-08- 3 NC-01 popular 306,000.00 Post 01-05-2021 5 science popular science books and 0 g d/National 2021 posters Services materials Preparatio Non- n of video CSMG- Preparation of imaging 62,500.0 Consultin RFQ/Limite 1-08- 4 NC-02 popular 425,000.00 Post 01-05-2021 5 popular science materials 0 g d/National 2021 science Services materials Promotion Non- al CSMG- preparation of project 25,000.0 Consultin RFQ/Limite 1-08- 5 NC-03 materials 170,000.00 Post 01-07-2022 5 preparati briefing 0 g d/National 2022 Services on 1,853,000. 272,500 Total (BF): 00 .00 Note:US$1 = CNY6.8 USD/RMB Exchange Rate 5 Climate Smart Management of Grassland Ecosystems Project Procurement Plan Selection of Consultants: Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Annex II to the Procurement Regulations (July 2016, revised November 2017 and August 2018): Procurement Contract Selection Method Bank Prior Review Threshold Category Value (US$) ≥ 300,000 QCBS, QBS, Firms: All contracts >=USD 2 million; QCBS, QBS, FBS, < 300,000 LCS, CQS Firms: All DS contracts >= USD 2 million; Consultants Others DS Individual Consultant: All contracts >=0.4 million; Others IC DS for individual consultant: All contracts>=USD 0.4 million Notes: QCBS: Quality- and Cost-Based Selection QBS: Quality-Based Selection FBS: Fixed Budget Selection LCS: Least Cost Selection CQS: Consultants’ Qualifications-based Selection Consultancy Assignments with Selection Methods and Time Schedule: 6 Climate Smart Management of Grassland Ecosystems Project Procurement Plan Climate smart management of grassland ecosystems Project Procurement Plan (Consulting Services) WB Estimation Cost Revie Estima Remar w ted Contra Contra Durati ks Contr No Selection Prior Bid ct ct on Progr act Contract Description Revie . method Openi Signing Amoun (mont ess No. w/Pos RMB USD t ng Date t hs) Revie Date w Grassland ecological CQS/Open/ Post CSMG- 612,000.0 01-03- 01-04- 1 environmental protection 90,000.00 National Revie 45 C-01 technology and knowledge training 0 2021 2021 w *1 CSMG- Grassland ecological animal CQS/Open/ Post 612,000.0 01-03- 01-04- 2 C-02 husbandry industry chain technical 0 90,000.00 National Revie 2021 2021 45 training w Monitoring and evaluation of grassland biodiversity and productivity (Monitoring and evaluation of the species Post CSMG- composition and community CQS/Open/ 3 structure of grassland vegetation 1,632,000. 240,000.00 Revie 01-03- 01-04- 45 *2 C-03 00 National 2021 2021 in the project area, calculating w grassland biodiversity, and carrying out by steps in the early, middle and late stages of project implementation) Monitoring and evaluation of grassland carbon sequestration (Evaluate and measure the soil carbon sequestration and livestock Post CSMG- CQS/Open/ 4 greenhouse gas emission 1,292,000. 190,000.00 Revie 01-03- 01-04- 45 C-05 reduction in the project area, 00 National 2021 2021 w calculate soil organic carbon content, fit organic carbon storage model, and calculate the soil carbon sequestration in grassland) Monitoring and evaluation of social Post CSMG- impact (carrying out monitoring of CQS/Open/ 5 security policy in the project area 680,000.0 100,000.00 Revie 01-03- 01-04- 45 *3 C-06 0 National 2021 2021 and monitoring and evaluation of w output and income) 7 Climate Smart Management of Grassland Ecosystems Project Procurement Plan WB Estimation Cost Revie Estima Remar w ted Contra Contra Durati ks Contr No Selection Prior Bid ct ct on Progr act Contract Description Revie . method Openi Signing Amoun (mont ess No. w/Pos RMB USD t ng Date t hs) Revie Date w Monitoring and evaluation of environmental benefit (monitoring and evaluation of Post CSMG- environmental cost-effectiveness CQS/Open/ 6 and adaptability of the project 680,000.0 100,000.00 Revie 01-03- 01-04- 45 *4 C-07 0 National 2021 2021 area, including monitoring and w evaluation of surface water quality, and application effects of pesticide) Pest management (Integration, demonstration and promotion of integrated pest control technologies; 2. Improve Post CSMG- farmers' awareness and CQS/Open/ 7 application of integrated pest 408,000.0 60,000.00 Revie 01-03- 01-04- 45 C-08 0 National 2021 2021 management knowledge; 3. w Improve farmers' scientific and rational chemical use and establish an specialized prevention and control team.) Preparation of technical guidelines for climate-smart grassland management (through the analysis of technologies, benefits and Post CSMG- carbon sequestration of grassland CQS/Open/ 8 and animal husbandry, to identify 544,000.0 80,000.00 Revie 01-03- 01-04- 45 C-09 0 National 2021 2021 key technical links and w parameters, and develop the technical guidelines for sustainable management of alpine grassland ecosystems) Grassland carbon sequestration reduction measurement and grassland carbon sink development (estimate the carbon Post CQS/Open/ CSMG- sink volume of the project 340,000.0 Revie 01-03- 01-04- 9 50,000.00 National 45 C-10 implementation area, based on the 0 w 2021 2021 project research results, to improve the relevant evaluation index system, introduce the identified carbon sinks into the 8 Climate Smart Management of Grassland Ecosystems Project Procurement Plan WB Estimation Cost Revie Estima Remar w ted Contra Contra Durati ks Contr No Selection Prior Bid ct ct on Progr act Contract Description Revie . method Openi Signing Amoun (mont ess No. w/Pos RMB USD t ng Date t hs) Revie Date w environmental trading platform, and develop grassland carbon sinks trading project) Improvement and innovation of subsidy and reward mechanism for grassland ecological protection (Based on the mature experience of developed countries and the Post CSMG- research results of international CQS/Open/ 10 C-11 organizations, evidence-based 816,000.0 120,000.00 Revie 01-03- 01-04- 45 0 National 2021 2021 grassland ecological reward policy w and production data after the implementation of the ecological subsidy policy in the project area, optimize and promote existing policies) Alpine grassland natural disaster assessment and adaptation model construction (using the computer Post CSMG CQS/Open/ 11 -C-12 process model to assess the 816,000.0 120,000.00 Revie 01-03- 01-04- 45 impact of natural disasters on the 0 National 2021 2021 w alpine grassland ecosystem and develop corresponding response mechanisms) Post CSMG- Project chief technical adviser *7 1,020,000. IC Revie 01-08- 01-09- On- 12 C-13 (375 days in total, $400/day for a 00 150,000.00 2020 2020 52 total of $150,000) w going Post CSMG- Ecological expert 408,000.0 IC Revie 01-08- 01-09- On- 13 C-14 (200 days in total, $300/day for a 0 60,000.00 2020 2020 52 total of $60,000) w going Post Carbon sink monitoring expert CSMG 408,000.0 IC Revie 01-08- 01-09- On- 14 (200 days in total, $300/day for a 60,000.00 52 P-C-15 total of $60,000) 0 w 2020 2020 going Scientific breeding expert Post CSMG- 306,000.0 IC 01-08- 01-09- On- 15 (150 days in total, $300/day for a 45,000.00 52 C-16 total of $45,000) 0 Revie 2020 2020 going 9 Climate Smart Management of Grassland Ecosystems Project Procurement Plan WB Estimation Cost Revie Estima Remar w ted Contra Contra Durati ks Contr No Selection Prior Bid ct ct on Progr act Contract Description Revie . method Openi Signing Amoun (mont ess No. w/Pos RMB USD t ng Date t hs) Revie Date w w Agriculture and animal husbandry Post CSMG- expert 306,000.0 IC Revie 01-03- 01-04- 16 45,000.00 45 C-17 (150 days in total, $300/day for a 0 w 2021 2021 total of $45,000) Procurement expert Post CSMG- 24 months in total, $2,700/ month 510,000.0 IC Revie 01-08- 01-09- *5 17 75,000.00 52 C-20 for a total of $75,000 including 0 w 2020 2020 traveling fee ) 11,390,0 1,675,00 Total (BF): 00 0.00                 Note: *1 According to PIM, the tasks of on-site teaching of herders and technical training of farming and pastoral technology and management personnel in towns and villages were adjusted to grassland ecological environmental protection technology and knowledge training and grassland ecological animal husbandry industry chain technical training to improve local herders environmental awareness and all levels managers and herdsmen have a budget for grassland ecological management and scientific breeding, both budgets are 90,000 US dollars. *2 The original grassland productivity task and the grassland biodiversity task were merged into the grassland productivity and diversity monitoring task. According to the scope of the task, the budget was adjusted to USD 240,000. *3 According to the arrangement of PIM and project activities, the monitoring method was adjusted, and the social impact task budget was adjusted to USD 100,000. *4 According to the arrangement of PIM and project activities, the monitoring method was adjusted, and the environmental benefit task budget was adjusted to USD 100,000. *5 This task is budgeted on a monthly basis. As the mission service period is adjusted to 24 months, so total budget is adjusted accordingly. US$1 = CNY6.8000 USD/RMB Exchange Rate *6 The schedule was adjusted due to the current progress and procurement plan for GSMG-G-1/2, GSMG-NC-1/2 and GSMG-C-1 to12 /17. *7 The Progress was changed as the consults have been purchased according to the approved PP and TORs. 10 PROCUREMENT China : Climate Smart Management of Grassland Ecosystems PLAN General Information Country: China 2018-09-25 Bank’s Approval Date of the Original Procurement Plan: 2024-10-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166853 GPN Date: 2020-07-14 Project Name: Climate Smart Management of Grassland Ecosystems Loan / Credit No: TF / A7694, TF / B1658 Climate Smart Staple Crop Production Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CSMG-G-01 / equipment nee Request for Quota Single Stage - One E TF / B1658 Knowledge Management Post Limited 50,000.00 43,683.95 Signed 2021-06-06 2022-04-22 2021-08-01 2022-06-11 2022-01-28 ded for publicity production tions nvelope CSMG-G-02 / Establishment Grassland Management Pilot Request for Quota Single Stage - One E of 6 village-level agricultural TF / B1658 Post Limited 90,000.00 0.00 Canceled 2024-04-06 2024-06-01 2024-11-28 s tions nvelope technology promotion platfor ms NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CSMG-NC-02 / Preparation of Request for Quota Single Stage - One E TF / B1658 Knowledge Management Post Limited 62,500.00 0.00 Signed 2021-05-28 2022-05-12 2021-07-23 2022-09-27 2022-01-19 video popular science materi tions nvelope als CSMG-NC-05 / Climate-smart Request for Quota Single Stage - One E grassland ecological manage TF / B1658 Knowledge Management Post Limited 26,000.00 0.00 Canceled 2023-03-06 2023-03-31 2023-05-01 2023-10-28 tions nvelope ment technologies promotion al activity CSMG-NC-03 / Promotional Request for Quota Single Stage - One E Pending Impl TF / B1658 Knowledge Management Post Limited - National 25,000.00 0.00 2024-09-06 2024-11-01 2025-04-30 materials preparation tions nvelope ementation CSMG-NC-06 / Development Grassland Management Pilot Request for Quota Single Stage - One E Pending Impl of a training course on climat TF / B1658 Post Limited - National 100,000.00 0.00 2024-09-06 2024-11-01 2025-04-30 s tions nvelope ementation e smart grassland knowledge network CSMG-NC-07 / Production of Grassland Management Pilot Request for Quota Single Stage - One E Pending Impl county promotional materials TF / B1658 Post Limited - National 80,000.00 0.00 2024-11-06 2025-01-01 2025-06-30 s tions nvelope ementation for the project CSMG-NC-08 / Technical trai ning and promotion of climat Grassland Management Pilot Request for Quota Single Stage - One E Pending Impl TF / B1658 Post Limited - National 40,000.00 0.00 2024-11-06 2025-01-01 2025-06-30 e-smart grassland ecosystem s tions nvelope ementation management at the county l evel CSMG-NC-01 / Preparation of Request for Quota Single Stage - One E Pending Impl TF / B1658 Knowledge Management Post Limited - National 45,000.00 0.00 2024-12-06 2025-01-31 2025-07-30 paper popular science materi tions nvelope ementation als CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CSG-C-003 / Contract No: CS G-C-003 Consultant Qualifi TF / A7694 Post Open - National 20,000.00 17,763.77 Completed 2018-09-18 2018-09-18 2018-10-09 2018-11-22 2018-11-27 2018-12-22 2019-01-10 2019-01-26 2019-01-30 2019-07-25 2020-09-21 Contract: Assessment of envi cation Selection ronment impact CSG-C-001 / Contract No:CS G-C-001 Consultant Qualifi TF / A7694 Post Open - National 70,000.00 62,173.20 Completed 2018-09-18 2018-09-18 2018-10-09 2018-11-22 2018-11-27 2018-12-22 2019-01-10 2019-01-26 2019-01-19 2019-07-25 2020-09-12 Contract:Feasibility Study cation Selection Report CSMG-C-01 / Grassland ecol Grassland Management Pilot Consultant Qualifi ogical environmental protecti TF / B1658 Post Open - National 90,000.00 94,426.29 Signed 2021-02-01 2021-02-19 2021-02-22 2021-03-23 2021-04-07 2021-04-13 2021-05-07 2021-06-08 2021-06-11 2021-06-26 2024-12-31 s cation Selection on technology and knowledg e training CSMG-C-02 / Grassland ecol Grassland Management Pilot Consultant Qualifi ogical animal husbandry indu TF / B1658 Post Open - National 90,000.00 90,287.16 Signed 2021-02-01 2021-02-19 2021-02-22 2021-03-23 2021-04-07 2021-04-13 2021-05-07 2021-06-08 2021-06-11 2021-06-26 2024-12-31 s cation Selection stry chain technical training CSMG-C-03 / Monitoring and Grassland Management Pilot Consultant Qualifi evaluation of grassland biodi TF / B1658 Post Open - National 240,000.00 246,994.51 Signed 2021-02-01 2021-02-19 2021-02-22 2021-03-23 2021-04-07 2021-04-13 2021-05-07 2021-06-08 2021-06-11 2021-06-26 2024-12-31 s cation Selection versity and productivity CSMG-C-05 / Monitoring and Grassland Management Pilot Consultant Qualifi evaluation of grassland carbo TF / B1658 Post Open - National 190,000.00 194,541.68 Signed 2021-02-01 2021-02-19 2021-02-22 2021-03-23 2021-04-07 2021-04-13 2021-05-07 2021-06-08 2021-06-11 2021-06-26 2024-12-31 s cation Selection n sequestration CSMG-C-06 / Monitoring and Grassland Management Pilot Consultant Qualifi TF / B1658 Post Open - National 100,000.00 102,227.00 Signed 2021-02-02 2021-02-19 2021-02-23 2021-03-23 2021-04-08 2021-04-13 2021-05-08 2021-06-08 2021-06-12 2021-06-26 2024-12-31 evaluation of social impact s cation Selection CSMG-C-07 / Monitoring and Grassland Management Pilot Consultant Qualifi TF / B1658 Post Open - National 100,000.00 105,052.51 Signed 2021-02-02 2021-02-19 2021-02-23 2021-03-23 2021-04-08 2021-04-13 2021-05-08 2021-06-08 2021-06-12 2021-06-26 2024-12-31 evaluation of environmental s cation Selection benefit CSMG-C-08 / Pest managem Grassland Management Pilot Consultant Qualifi TF / B1658 Post Open - National 60,000.00 61,940.46 Signed 2021-02-02 2021-02-19 2021-02-23 2021-03-23 2021-04-08 2021-04-13 2021-05-08 2021-06-08 2021-06-12 2021-06-26 2024-12-31 ent s cation Selection Page 1 CSMG-C-10 / Grassland carb on sequestration reduction m Consultant Qualifi TF / B1658 Knowledge Management Post Open - National 50,000.00 45,478.06 Signed 2021-02-02 2021-02-19 2021-02-23 2021-03-23 2021-04-08 2021-04-13 2021-05-08 2021-06-08 2021-06-12 2021-06-26 2024-12-31 easurement and grassland c cation Selection arbon sink development CSMG-C-11 / Improvement a nd innovation of subsidy and Consultant Qualifi TF / B1658 Knowledge Management Post Open - National 120,000.00 0.00 Signed 2021-02-02 2022-04-01 2021-02-23 2022-05-12 2021-04-08 2022-05-27 2021-05-08 2021-06-12 2022-09-27 2024-12-31 reward mechanism for grassl cation Selection and ecological protection CSMG-C-12 / Risk assessme Policy and Strategy Develop Consultant Qualifi nt and response measures fo TF / B1658 Post Open - National 60,000.00 0.00 Signed 2022-04-17 2022-04-01 2022-05-08 2022-05-12 2022-06-21 2022-05-28 2022-07-21 2022-05-27 2022-08-25 2022-09-27 2024-12-31 ment cation Selection r alpine grassland animal hus bandry CSMG-C-18 / Livestock meth Grassland Management Pilot Consultant Qualifi ane abatement technology a TF / B1658 Post Open - National 80,000.00 0.00 Signed 2022-04-15 2022-04-01 2022-05-06 2022-05-12 2022-06-19 2022-05-28 2022-07-19 2022-09-27 2022-08-23 2022-09-27 2024-12-31 s cation Selection nd monitoring CSMG-C-19 / Grassland Wildl Grassland Management Pilot Consultant Qualifi TF / B1658 Post Open - National 100,000.00 0.00 Signed 2022-04-15 2022-04-01 2022-05-06 2022-05-12 2022-06-19 2022-05-28 2022-07-19 2022-09-27 2022-08-23 2022-09-27 2024-12-31 ife Monitoring and Impact As s cation Selection sessment CSMG-C-09 / Preparation of t Policy and Strategy Develop Consultant Qualifi Under Implement echnical guidelines for climat TF / B1658 Post Open - National 80,000.00 0.00 2024-04-02 2023-10-09 2024-04-23 2024-10-16 2024-06-06 2024-07-06 2024-08-10 2026-01-05 ment cation Selection ation e-smart grassland managem ent CSMG-C-21 / Yak allopatry fa Grassland Management Pilot Consultant Qualifi Under Implement ttening and emission reducti TF / B1658 Post Open - National 50,000.00 0.00 2024-04-01 2024-07-02 2024-04-22 2024-06-05 2024-07-05 2024-08-09 2025-09-30 s cation Selection ation on test demonstration CSMG-C-25 / Theory and pra Grassland Management Pilot Consultant Qualifi Under Implement ctice of climate smart grassla TF / B1658 Post Open - National 100,000.00 0.00 2024-04-01 2024-07-02 2024-04-22 2024-06-05 2024-07-05 2024-08-09 2025-09-30 s cation Selection ation nds in China CSMG-C-26 / Research on Cli mate Smart Grassland and H Grassland Management Pilot Consultant Qualifi TF / B1658 Post Open - National 60,000.00 0.00 Canceled 2024-04-01 2024-04-22 2024-06-05 2024-07-05 2024-08-09 2025-09-30 erdsman Participation Mecha s cation Selection nism Innovation in China CSMG-C-27 / Empirical and p Policy and Strategy Develop Consultant Qualifi Under Implement olicy research on ecological p TF / B1658 Post Open - National 45,000.00 0.00 2024-04-01 2024-07-02 2024-04-22 2024-06-05 2024-07-05 2024-08-09 2025-09-30 ment cation Selection ation rotection in grassland pastor al areas CSMG-C-28 / Methodological studies on carbon sequestrat Policy and Strategy Develop Consultant Qualifi Under Implement TF / B1658 Post Open - National 35,000.00 0.00 2024-04-01 2024-07-02 2024-04-22 2024-06-05 2024-07-05 2024-08-09 2025-09-30 ion and emission reduction in ment cation Selection ation climate smart grasslands CSMG-C-29 / Climate smart Consultant Qualifi Under Implement TF / B1658 Knowledge Management Post Open - National 40,000.00 0.00 2024-04-01 2024-07-02 2024-04-22 2024-06-05 2024-07-05 2024-08-09 2025-09-30 grassland science book prod cation Selection ation uction CSMG-C-31 / Development o Grassland Management Pilot Consultant Qualifi f a training course on climate TF / B1658 Post Open - National 100,000.00 0.00 Canceled 2024-04-01 2024-04-22 2024-06-05 2024-07-05 2024-08-09 2025-09-30 s cation Selection smart grassland knowledge n etwork CSMG-C-24 / Research on tr aditional ecological culture a Grassland Management Pilot Consultant Qualifi Pending Impleme TF / B1658 Post Open - National 40,000.00 0.00 2024-07-15 2024-08-05 2024-09-18 2024-10-18 2024-11-22 2025-05-21 nd grassland protection in pa s cation Selection ntation storal areas of the Qinghai Pl ateau CSMG-C-22 / Technical Guid Grassland Management Pilot Consultant Qualifi Pending Impleme elines for Carbon Sequestrati TF / B1658 Post Open - National 25,000.00 0.00 2024-11-01 2024-11-22 2025-01-05 2025-02-04 2025-03-11 2025-09-07 s cation Selection ntation on in Pastoral Mowing Grassl ands CSMG-C-23 / Exploration of t Grassland Management Pilot Consultant Qualifi Pending Impleme he value realization mechani TF / B1658 Post Open - National 60,000.00 0.00 2024-11-01 2024-11-22 2025-01-05 2025-02-04 2025-03-11 2025-09-07 s cation Selection ntation sm of grassland livestock foo d CSMG-C-30 / Project Comple Grassland Management Pilot Consultant Qualifi Pending Impleme TF / B1658 Post Open - National 70,000.00 0.00 2024-11-01 2024-11-22 2025-01-05 2025-02-04 2025-03-11 2025-09-07 tion Report s cation Selection ntation INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CSG-C-004 / Contract No:CS Individual Consult G-C-004 TF / A7694 Post Open 10,000.00 8,881.89 Completed 2018-09-18 2018-09-18 2018-11-06 2018-12-24 2018-11-27 2019-01-10 2019-01-01 2019-01-20 2019-06-30 2020-01-10 ant Selection Contract:Project coordina tor CSG-C-002 / Contract No:CS G-C-002 Individual Consult TF / A7694 Post Open 10,000.00 8,881.89 Completed 2018-09-18 2018-09-18 2018-11-06 2018-12-24 2018-11-27 2019-01-10 2019-01-01 2019-01-30 2019-06-30 2020-09-21 Contract:Assessment of s ant Selection ocial impact CSG-C-005 / Contract No:CS Grassland Management Pilot TF / A7694 Post Direct Selection Direct 10,000.00 9,184.29 Completed 2020-01-14 2020-01-13 2020-01-14 2020-01-10 2020-03-20 2020-02-03 2020-09-16 2020-05-22 G-C-005 Contract: Project C s oordinator CSG-C-006 / Baseline Survey TF / A7694 Grassland Management Pilot Post Direct Selection Direct 17,400.00 16,786.06 Completed 2020-04-11 2020-04-12 2020-04-21 2020-04-13 2020-06-25 2020-05-01 2020-12-22 2020-09-20 s CSMG-C-17 / Agriculture and Grassland Management Pilot Individual Consult TF / B1658 Post Limited 45,000.00 52,062.90 Signed 2020-10-10 2020-12-08 2020-10-15 2021-01-18 2020-11-05 2021-01-25 2020-12-10 2021-02-03 2021-06-08 animal husbandry expert s ant Selection CSMGP-C-15 / Carbon sink m Grassland Management Pilot Individual Consult TF / B1658 Post Limited 60,000.00 60,004.71 Signed 2020-10-10 2020-12-08 2020-10-15 2021-01-18 2020-11-05 2021-01-29 2020-12-10 2021-02-15 2021-06-08 onitoring expert s ant Selection CSMG-C-14 / Ecological expe Grassland Management Pilot Individual Consult TF / B1658 Post Limited 60,000.00 59,767.84 Signed 2020-10-10 2020-12-08 2020-10-15 2021-01-18 2020-11-05 2021-01-29 2020-12-10 2021-02-03 2021-06-08 rt s ant Selection CSMG-C-13 / Project chief te Grassland Management Pilot Individual Consult TF / B1658 Post Limited 150,000.00 143,714.06 Signed 2020-10-10 2020-12-08 2020-10-15 2021-01-18 2020-11-05 2021-01-29 2020-12-10 2021-02-15 2021-06-08 chnical adviser s ant Selection CSMG-C-20 / Procurement e Grassland Management Pilot Individual Consult TF / B1658 Post Limited 75,000.00 0.00 Canceled 2021-02-19 2021-02-24 2021-03-17 2021-08-10 2023-11-29 xpert s ant Selection CSMG-C-16 / Scientific breed Grassland Management Pilot Individual Consult TF / B1658 Post Limited 45,000.00 0.00 Canceled 2020-10-10 2020-12-08 2020-10-15 2020-11-05 2020-12-10 2021-06-08 ing expert s ant Selection Page 2 CSMG-C-32 / Project Knowle Individual Consult Pending Impleme TF / B1658 Knowledge Management Post Open - National 50,000.00 0.00 2024-11-01 2024-12-20 2025-01-10 2025-02-14 2025-08-13 dge Management Specialist ant Selection ntation Page 3