PROCUREMENT PLAN Version 2.2 – Date: May 8, 2024 Indonesia Mangroves for Coastal Resilience Project (P178009) A. Project information: Country: Indonesia Borrower: Republic of Indonesia Project ID: P178009 Financing Agreement IBRD-93740 Number: Project Implementation Agency(ies): MoEF PMU: MoEF PIU: BRGM, IEF, WMFH B. Key Dates: 1. Procurement Plan: a. Version 1.0 (for negotiation) Bank’s Approval to this version: Period covered by this version: b. Version 2.1 (previous Nov 24, 2022 version) Bank’s Approval to this Nov 24, 2022 version: Period covered by this Until May 8, 2024 version: c. Version 2.2 (this version) May 8, 2024 Bank’s Approval to this May 8, 2024 version: Period covered by this ongoing version: d. [next version, if any] [to be updated] 2. General Procurement Notice: C. Preamble All Procurement under the Project shall be carried out in accordance with the World Bank’s Procurement Regulations for IPF Borrowers of November 2020, and the provisions of the Procurement Plan and Project Operations Manual and shall take precedence over any national procurement regulations. In accordance with paragraph 5.9 of the Procurement Regulations, the Bank’s online procurement planning and tracking tools i.e. Systematic Tracking and Exchanges in Procurement (STEP) will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. D. Key Provisions The following conditions apply to all procurement activities in this Procurement Plan. The Bank’s procurement prior review thresholds: The identified procurement risk under this Project is ‘Substantial’. Accordingly, all contracts listed in the Procurement Plan that are at or above the thresholds set out below are subject to the Bank’s prior review. All other contracts are subject to the Bank’s ex-post review. Table 1. Applied Prior Review Threshold Type of procurement Procurement Prior Review Thresholds (US$ millions) Works (including turnkey, supply & installation of 10 plant and equipment, and PPP) Goods, Information Technology and Non- 2 consulting Services Consultants: Firms 1 Consultants: Individuals 0.3 The Bank’s approved selection methods thresholds: The following selection method thresholds shall apply for procurement of goods & information technology, non-consulting services and consulting services of each identified activity. Table 2. Applied Approved Selection Method Threshold Type of procurement and Approved Selection Method Thresholds Approved Selection (US$ millions) Method National International Works (including turnkey, supply & installation of plant and equipment, and PPP) (i) Request for Request for at or above $0.4 and at or above $40 Bids (RFB) less than $40 (ii) Request for Quotations less than $0.4 N/A (RFQ) (iii) Direct Selection On exceptional basis On exceptional basis if justified as per if justified as per paragraph 6.8, 6.9 paragraph 6.8, 6.9 and 6.10 of the and 6.10 of the Procurement Procurement Regulations Regulations Goods, Information Technology and Non-consulting services a. For Goods and Information Technology: (i) Request for Request for at or above $0.5 and at or above $10 Bids (RFB) less than $10 (ii) Request for Quotations less than $0.5 N/A (RFQ) (iii) Direct Selection On exceptional basis On exceptional basis if justified as per if justified as per paragraph 6.8, 6.9 paragraph 6.8, 6.9 and 6.10 of the and 6.10 of the Procurement Procurement Regulations Regulations b. For Non-consulting Services: (i) Request for Request for at or above $0.5 and at or above $10 Bids (RFB) less than $10 Type of procurement and Approved Selection Method Thresholds Approved Selection (US$ millions) Method National International (ii) Request for Quotations less than $0.5 N/A (RFQ) (iii) Direct Selection On exceptional basis On exceptional basis if justified as per if justified as per paragraph 6.8, 6.9 paragraph 6.8, 6.9 and 6.10 of the and 6.10 of the Procurement Procurement Regulations Regulations Consultants: firms a. For Selection of Consulting Firms (i) Quality Cost Based Shortlist of firms for at or above $0.5 Selection (QCBS), Fixed contracts below $0.5 Budget Based Selection may comprise (FBS), Least Cost Based entirely national Selection (LCS) and firms Quality Based Selection (QBS) (ii) Consultant’s less than $0.5 N/A Qualifications Based Selection (CQS) (iii) Direct Selection On exceptional basis On exceptional basis if justified as per if justified as per paragraph 7.13, 7.14 paragraph 7.13, 7.14 and 7.15 of the and 7.15 of the Procurement Procurement Regulations Regulations b. For Selection of Individual Consultants (i) Open Competitive All, no monetary All, no monetary Selection of Individual threshold threshold Consultants and Limited Competitive Selection of Individual Consultants (ii) Direct Selection of On exceptional basis On exceptional basis Individual Consultants if justified as per if justified as per paragraph 7.39 of paragraph 7.39 of the Procurement the Procurement Regulations Regulations Standard Procurement Documents (SPD): The Bank’s SPD shall be used when approaching the international market (specifically for international competitive procurement and those contracts shall be as specified in the Procurement Plan tables in STEP. Use of National Procurement Procedures: In accordance with paragraphs 5.3 of the Procurement Regulations, when approaching the national market all contracts to be procured through open national competitive procurement will follow the GoI’s procurement regulation. The procedures applicable to the procurement of goods and non-consulting services awarded on the basis of open national competitive procurement shall be those of the Tender method as set forth in the Peraturan Presiden No. 16/2018 and its subsequent amendment Peraturan Presiden No. 12/2021) provided that such arrangements continue to meet requirements set forth under paragraph 5.4 of these Regulations and the following conditions: 1. The procurement is open to eligible firms from any country. There shall not any restriction to the bidders’ participation including mandatory requirement to form in joint venture; 2. Any gaps between National Procurement Procedures and the Procurement Regulations will be addressed and incorporated in the harmonized bidding documents acceptable by the Bank. Use of National e-Procurement System (SPSE): Unless informed otherwise by the Bank in writing, SPSE e-procurement system may be used only for procurement of works, goods and non-consulting services under Request for Bids (RFB) method through national open competitive procurement method, applying the harmonized model bidding documents for national open competitive procurement agreed by the Bank. For selection of consulting services through QCBS method, only the modified SPSE (termed by LKPP as SPSE-“ICB”) may be used applying the Bank’s Standard Request for Proposal (RFP) document. The Bank has further accepted GOI’s proposal for use of SPSE-ICB for selection of consulting services through CQS method applying a modified Bank’s Standard RFP. Two consulting services activities (contracts) under other Bank- financed project are being performed as pilot use of SPSE-ICB for CQS method to ensure that the system is working as intended. Since at the present time LKPP has not yet developed the modified SPSE for procurement of goods, works and non-consulting services under international open Competitive method, nor for selection of consulting services under QBS, LCS, FBS, and individual consultant selection methods, therefore procurement of all contract packages under these methods shall be carried out through non-electronic process with manual issuance of specific procurement notice (request for expression of interest or invitation for bids/proposals and receipt of bids/proposals), until such time that the modified SPSE has been completed by LKPP and assessed by the Bank to be acceptable. If the Bank determines the modified SPSE to be acceptable for use under the above-mentioned remaining procurement methods, the Bank will confirm through the Bank’s written no objection to LKPP and will also notify in writing to PMU/PIU. Use of National e-Catalogue System. Based on the Bank’s assessment of the national e-catalogue system, the Bank allows the Project Implementing Units (PIUs) under World Bank financed projects to use the national e- catalogue for procurement of small value of goods in lieu of the Request for Quotations (RFQ) method specified in these Regulations within the parameters as below: a) For Goods (other than medicines) with estimated cost not more than USD 15,000 equivalent per contract. PIUs may use the national e-catalogue for procuring such items of goods within the above-specified threshold, if such goods are required under the project and specified in the Procurement Plan approved by the Bank. b) Goods (other than medicines) with estimated cost greater than USD 15,000 but less than USD 100,000 equivalent per contract. PIUs may use the national e-catalogue for procuring such items of goods if such goods are required under the project subject to fulfilling the following additional procedural requirement as below: PMU and PIU shall carry out a secondary procurement process through mini competition, by comparing the prices of similar goods offered by at least three different suppliers which available in the national e-catalogue and then selecting the Supplier with the lowest evaluated price on the basis of “as delivered" price at final destination (i.e., including inland transportation, insurance, applicable taxes and any other incidental charges for the delivery of the required quantity of goods at final destination). E. Other Relevant Procurement Information • Project Operations Manual (POM) shall set out the operating procedures for procurement and contract implementation matters under the Project written in Bahasa, which shall be consistent with the procedures and rules specified under the Bank’s Procurement Regulations. In case of any difference of interpretation between the POM and the Bank’s Procurement Regulations, the later shall prevail; • PMU and PIU may use its own forms of contract for goods/non-consulting services procured under Request for Quotations (RFQ) method when approaching to national market, acceptable to the Bank; • Advance procurement may be applied under the project and shall be valid by signing of the Loan Agreement. PMU and PIU may commence the procurement process prior to issuance of the DIPA for any anticipated activity to be procured under the Project, while signing of the contract shall be subject to issuance of the DIPA of the respective activity. All contracts shall not be designed as single-year contract, and therefore procurement process shall continue throughout multiple calendar years without limitation of contract period up to end of the GoI’s fiscal year; • Regardless of the Bank’s review requirement (prior or post), the Bank may review technical aspects of procurement documents and other non- procurement matters (terms of reference, statement of works, technical specifications, environmental documents, cost estimate, etc.) related to the procurement activity in question, if needed; • The Bank will continue to provide guidance and support to the PMU and PIU for procurement processing through the STEP. • Project Implementation Support Personnel shall not be included in this Procurement Plan. Their selection and hiring procedures shall continue to apply the GoI’s selection and hiring procedures as further defined in the POM. The Procurement Plan is a living document and can be revised if there are any changes during the implementation of the project. PROCUREMENT Indonesia : Mangroves for Coastal Resilience Project PLAN General Information Country: Indonesia 2022-11-24 Bank’s Approval Date of the Original Procurement Plan: 2024-10-10 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P178009 GPN Date: Project Name: Mangroves for Coastal Resilience Project Loan / Credit No: IBRD / 93740, TF / B8468, TF / B8778 Indonesian Environment Fund Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ID-IEF-329708-GO-RFQ / Co Component 1. Strengthening Request for Quota Single Stage - One E mputer and Printer Kemenko IBRD / 93740 Policy and Institutions for Ma Post Open - National 32,000.00 0.00 Signed 2022-12-12 2023-02-06 2023-05-16 2023-08-05 tions nvelope marves ngrove Management ID-IEF-328037-GO-RFQ / Tabl Component 1. Strengthening Request for Quota Single Stage - One E et, smart board, laptop BPDL IBRD / 93740 Policy and Institutions for Ma Post Limited 53,550.00 0.00 Signed 2022-12-12 2023-03-06 2023-02-06 2023-05-16 2023-08-05 tions nvelope H ngrove Management Component 1. Strengthening ID-IEF-394006-GO-RFB / Car Single Stage - One E Pending Impl TF / B8778 Policy and Institutions for Ma Post Request for Bids Open - National 372,000.00 0.00 2024-08-30 2024-09-04 2024-10-16 2024-11-15 2024-12-20 2025-06-18 bon Measurement Equipment nvelope ementation ngrove Management Component 1. Strengthening ID-IEF-403843-GO-RFQ / Hi-r Request for Quota Single Stage - One E TF / B8468 Policy and Institutions for Ma Post Open - National 100,000.00 0.00 Canceled 2024-02-05 2024-04-01 2024-09-28 es imagery tions nvelope ngrove Management ID-IEF-359842-GO-RFQ / Hi-r es imagery (30cm/50cm 4-ba nd[rgb-nir]) @1000km for val Component 1. Strengthening Request for Quota Single Stage - One E idation and training data aug TF / B8468 Policy and Institutions for Ma Post Open - National 100,000.00 0.00 Canceled 2023-06-16 2023-08-11 2024-02-07 tions nvelope mentation, and .3cm data an ngrove Management nually for 75k ah (@26$ per Km2) 100km min AOI for mo nitoring Component 1. Strengthening ID-IEF-404125-GO-RFQ / PPE Request for Quota Single Stage - One E Pending Impl TF / B8778 Policy and Institutions for Ma Post Open - National 43,000.00 0.00 2024-09-04 2024-10-30 2025-04-28 for field team members tions nvelope ementation ngrove Management ID-IEF-376418-GO-RFB / Stre Component 1. Strengthening Single Stage - One E ngthening the hardware and TF / B8468 Policy and Institutions for Ma Post Request for Bids Open - National 200,000.00 0.00 Canceled 2023-08-09 2023-08-14 2023-09-25 2023-10-25 2023-11-29 2024-05-27 nvelope system of SRN ngrove Management Component 1. Strengthening ID-IEF-359814-GO-RFQ / Sca Request for Quota Single Stage - One E TF / B8468 Policy and Institutions for Ma Post Open - National 6,972.00 0.00 Canceled 2023-05-08 2023-07-03 2023-12-30 nner, camera and printer tions nvelope ngrove Management Component 1. Strengthening ID-IEF-376456-GO-RFB / Clou Single Stage - One E TF / B8468 Policy and Institutions for Ma Post Request for Bids Open - National 165,800.00 0.00 Canceled 2024-03-31 2024-04-05 2024-05-17 2024-06-16 2024-07-21 2025-01-17 d computing service nvelope ngrove Management Component 1. Strengthening ID-IEF-361554-GO-RFQ / IT E Request for Quota Single Stage - One E Pending Impl TF / B8468 Policy and Institutions for Ma Post Open - National 25,963.00 0.00 2024-02-25 2024-04-21 2024-10-18 quipment tions nvelope ementation ngrove Management Component 1. Strengthening ID-IEF-376466-GO-RFB / Soft Single Stage - One E Under Imple TF / B8468 Policy and Institutions for Ma Post Request for Bids Open - National 200,000.00 0.00 2024-02-20 2023-09-01 2024-02-20 2024-02-20 2024-02-20 2024-02-20 2024-02-20 2024-02-20 2025-08-13 ware and hardware nvelope mentation ngrove Management ID-IEF-419295-GO-RFQ / The Component 1. Strengthening provision of hi-res imagery of Request for Quota Single Stage - One E TF / B8468 Policy and Institutions for Ma Post Open - National 100,000.00 0.00 Canceled 2024-07-05 2024-08-30 2025-02-26 mangrove forrest in Indonesi tions nvelope ngrove Management a for validation and training data augmentation ID-IEF-419318-GO-RFQ / Sup Component 1. Strengthening porting equipment for design Request for Quota Single Stage - One E Pending Impl TF / B8468 Policy and Institutions for Ma Post Open - National 52,083.00 0.00 2024-07-05 2024-08-30 2025-02-26 and the establishment of ma tions nvelope ementation ngrove Management ngrove sampling network wit h permanent field plots ID-IEF-436756-GO-RFQ / Pro Component 1. Strengthening curement of Hardware to Sup Request for Quota Single Stage - One E Pending Impl TF / B8468 Policy and Institutions for Ma Post Open - National 81,111.00 0.00 2024-06-15 2024-08-10 2025-02-06 port Sub Component Activitie tions nvelope ementation ngrove Management s 1.3.4 - DIRECTORATE OF IG RK and MPV, DG. PPI ID-IEF-438501-GO-RFB / Soft Component 1. Strengthening ware and hardware to Suppo Single Stage - One E Under Imple TF / B8468 Policy and Institutions for Ma Post Request for Bids Open - National 200,000.00 0.00 2024-02-20 2023-09-04 2024-02-25 2024-04-07 2023-09-04 2024-05-07 2024-01-15 2024-06-11 2024-12-08 rt National Mangrove Spatial nvelope mentation ngrove Management Data Management (1.2.6) ID-IEF-419299-GO-RFQ / har Component 1. Strengthening dware and software Supporti Request for Quota Single Stage - One E Pending Impl TF / B8468 Policy and Institutions for Ma Post Open - National 318,680.00 0.00 2024-07-20 2024-09-14 2025-03-13 ng National Mangrove Spatial tions nvelope ementation ngrove Management Data Management (1.2.6) ID-IEF-452977-GO-RFB / Soft Component 1. Strengthening ware and hardware to Suppo Single Stage - One E Pending Impl TF / B8468 Policy and Institutions for Ma Post Request for Bids Open - National 200,000.00 0.00 2023-09-01 2023-09-06 2023-10-18 2023-11-17 2023-12-22 2024-06-19 rt National Mangrove Spatial nvelope ementation ngrove Management Data Management (1.2.6). ID-IEF-453699-GO-RFQ / Pro curement of IT Equipment in Component 1. Strengthening Request for Quota Single Stage - One E Pending Impl Order to Support The Implem TF / B8468 Policy and Institutions for Ma Post Open - National 18,300.00 0.00 2024-10-05 2024-11-30 2025-05-29 tions nvelope ementation entation of The M4CR Project ngrove Management Activities Sub Component 1.3 .3 NON CONSULTING SERVICES Page 1 Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ID-IEF-410766-NC-RFQ / Lab Component 1. Strengthening Request for Quota Single Stage - One E Pending Impl oratory costs for soil carbon TF / B8468 Policy and Institutions for Ma Post Limited - National 15,000.00 0.00 2024-12-01 2025-01-24 2025-02-24 tions nvelope ementation analysis ngrove Management ID-IEF-424367-NC-RFQ / Virt ual Private Server (VPS) Rent Component 1. Strengthening Request for Quota Single Stage - One E al Activities To Strengthen Th TF / B8468 Policy and Institutions for Ma Post Limited - National 134,722.00 0.00 Canceled 2024-04-29 2024-06-24 2024-07-23 tions nvelope e Management Of Geospatial ngrove Management Information, Especially Natio nal Mangrove Map Data ID-IEF-425289-NC-RFQ / Cap acity Building for Strengtheni Component 1. Strengthening Request for Quota Single Stage - One E ng Geospatial Information Inf TF / B8468 Policy and Institutions for Ma Post Open - National 27,778.00 0.00 Canceled 2024-04-29 2024-06-24 2024-07-23 tions nvelope rastructure to support Nation ngrove Management al Mangrove Map system ma nagement. ID-IEF-424370-NC-RFQ / Fore Component 1. Strengthening ign Official Travel In Order To Request for Quota Single Stage - One E TF / B8468 Policy and Institutions for Ma Post Limited - National 70,000.00 0.00 Canceled 2024-05-04 2024-06-29 2024-12-26 Support The Achivement Of tions nvelope ngrove Management Mangrove For Coastal Resilie nce (M4CR) Project ID-IEF-451337-NC-DIR / Even Component 1. Strengthening t Organizer Mangrove Rehab Under Imple TF / B8468 Policy and Institutions for Ma Post Direct Selection Direct - National 55,000.00 0.00 2024-08-01 2024-08-01 2024-08-06 2024-09-10 2025-03-09 ilitation Exhibition at the LIKE mentation ngrove Management 2 Festival (1.1.6.A) ID-IEF-453258-NC-RFQ / Eve Component 1. Strengthening nt Organizer for Operation an Request for Quota Single Stage - One E Pending Impl TF / B8468 Policy and Institutions for Ma Post Open - National 50,000.00 0.00 2024-01-20 2024-03-16 2024-09-12 d Functioning of Pokja Mangr tions nvelope ementation ngrove Management ove-RPDM KLHK (KKMD) (1.1. 3.A) ID-IEF-453247-NC-RFQ / Man Component 1. Strengthening grove planting activities with Request for Quota Single Stage - One E Pending Impl TF / B8468 Policy and Institutions for Ma Post Limited - National 13,200.00 0.00 2024-08-06 2024-10-01 2025-03-30 KKMD in the Angke Kapuk pr tions nvelope ementation ngrove Management otected forest area, Jakarta ( 1.1.3.A) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ID-IEF-360148-CS-CQS / Soft Component 1. Strengthening Consultant Qualifi Under Implement ware development, support, TF / B8468 Policy and Institutions for Ma Post Open - National 250,000.00 0.00 2023-06-11 2023-09-15 2023-07-02 2024-02-20 2023-08-15 2024-03-15 2023-09-14 2023-10-19 2024-04-16 cation Selection ation and capacity building ngrove Management ID-IEF-361473-CS-QCBS / Blu Component 1. Strengthening Quality And Cost- Open - Internationa Under Implement e Carbon Offset Preparation TF / B8778 Policy and Institutions for Ma Prior 1,060,980.00 0.00 2024-02-01 2024-04-17 2024-02-22 2024-05-22 2024-04-06 2024-05-04 2024-06-03 2024-07-08 2024-08-12 2025-08-12 Based Selection l ation Consultant ngrove Management ID-IEF-371920-CS-CQS / Anal Component 1. Strengthening Consultant Qualifi Under Implement ysis on Carbon Economics, Fi TF / B8778 Policy and Institutions for Ma Post Open - National 58,670.00 0.00 2024-01-25 2024-01-25 2024-02-15 2024-03-30 2024-04-29 2024-06-03 2024-11-30 cation Selection ation nancing and Policy of Mangro ngrove Management ve ID-IEF-376460-CS-QCBS / De Component 1. Strengthening sign and establishment of a Quality And Cost- TF / B8468 Policy and Institutions for Ma Post Open - National 350,000.00 0.00 Canceled 2023-08-09 2023-08-30 2023-10-13 2023-11-10 2023-12-10 2024-01-14 2024-02-18 2025-02-17 mangrove sampling network Based Selection ngrove Management with permanent field plots ID-IEF-376463-CS-QCBS / De velopment and implementati Component 1. Strengthening on of a comprehensive meth Quality And Cost- TF / B8468 Policy and Institutions for Ma Post Open - National 375,000.00 0.00 Canceled 2023-08-09 2023-08-30 2023-10-13 2023-11-10 2023-12-10 2024-01-14 2024-02-18 2025-02-17 odology for mangrove field m Based Selection ngrove Management onitoring to be conducted at plot locations established un der (b) ID-IEF-360266-CS-CQS / Das Component 1. Strengthening hboard hardware - Integrated Consultant Qualifi TF / B8468 Policy and Institutions for Ma Post Open - National 75,000.00 0.00 Canceled 2023-06-11 2023-09-15 2023-07-02 2023-08-15 2023-09-14 2023-10-19 2024-04-16 data platform to support coor cation Selection ngrove Management dination of mangrove rehabili tation ID-IEF-360268-CS-CQS / Firm Component 1. Strengthening Consultant Qualifi to operationalize and provide TF / B8468 Policy and Institutions for Ma Post Open - National 75,000.00 0.00 Canceled 2023-06-11 2023-07-02 2023-08-15 2023-09-14 2023-10-19 2024-04-16 cation Selection technical support for dashbo ngrove Management ard ID-IEF-404958-CS-CQS / Stre Component 1. Strengthening Consultant Qualifi Under Implement ngthening The Hardware and TF / B8468 Policy and Institutions for Ma Post Open - National 200,000.00 0.00 2023-12-18 2023-11-13 2024-01-08 2024-02-21 2024-03-22 2024-04-26 2024-10-23 cation Selection ation Robust System of SRN and C ngrove Management arbon Registry ID-IEF-369529-CS-CQS / Sup port to development of Perda Component 1. Strengthening Mangrove and the operations Consultant Qualifi TF / B8468 Policy and Institutions for Ma Post Open - National 227,300.00 0.00 Canceled 2023-06-28 2023-07-19 2023-09-01 2023-10-01 2023-11-05 2024-05-03 of Pokja Mangroves (scoping cation Selection ngrove Management dialogues, academic drafting, public consultation) ID-IEF-359862-CS-CQS / Dev elopment and Implementatio Component 1. Strengthening Consultant Qualifi n of software ecosystem to s TF / B8468 Policy and Institutions for Ma Post Open - National 150,000.00 0.00 Canceled 2024-03-31 2024-04-21 2024-06-04 2024-07-04 2024-08-08 2025-02-04 cation Selection upport mapping, monitoring, ngrove Management MRV and linkages with carbo n registries and the SRN ID-IEF-408361-CS-CQS / Dev Component 1. Strengthening elopment of SIGAP KLHK and Consultant Qualifi Under Implement TF / B8468 Policy and Institutions for Ma Post Open - National 100,000.00 0.00 2024-03-17 2024-03-05 2024-04-07 2024-05-21 2024-06-20 2024-07-25 2025-01-21 Integration with the Mangrov cation Selection ation ngrove Management e Information System ID-IEF-403734-CS-CQS / Con Component 1. Strengthening sulting service for support Op Consultant Qualifi TF / B8468 Policy and Institutions for Ma Post Open - National 100,000.00 0.00 Canceled 2024-10-31 2024-11-21 2025-01-04 2025-02-03 2025-03-10 2025-09-06 erationalization of a mangrov cation Selection ngrove Management e information dashboard ID-IEF-403838-CS-CQS / Eve Component 1. Strengthening Consultant Qualifi nt Organizer for Operation an TF / B8468 Policy and Institutions for Ma Post Open - National 50,000.00 0.00 Under Review 2024-01-21 2024-01-15 2024-02-11 2024-03-26 2024-04-25 2024-05-30 2024-11-26 cation Selection d Functioning of Pokja Mangr ngrove Management ove-RPDM KLHK Page 2 ID-IEF-419087-CS-CQS / Ass essment of management ass Component 1. Strengthening Consultant Qualifi Under Implement et for National Mangrove Geo TF / B8468 Policy and Institutions for Ma Post Limited - National 72,682.00 0.00 2024-03-28 2024-03-06 2024-04-11 2024-05-11 2024-06-15 2024-12-12 cation Selection ation spatial Information Infrastruc ngrove Management ture and Development of the KLHK JIG Blue Print ID-IEF-419094-CS-CQS / Inte Component 1. Strengthening gration of National Mangrove Consultant Qualifi Under Implement TF / B8468 Policy and Institutions for Ma Post Open - National 143,703.00 0.00 2024-03-28 2024-03-06 2024-04-18 2024-05-08 2024-06-01 2024-07-01 2024-08-05 2025-02-01 Map Data into the Mangrove cation Selection ation ngrove Management Information System using the SIGAP Geoportal ID-IEF-419324-CS-CQS / Dev elopment and Implementatio Component 1. Strengthening Consultant Qualifi Under Implement n of software ecosystem to s TF / B8468 Policy and Institutions for Ma Post Open - National 75,856.00 0.00 2024-03-28 2024-03-31 2024-04-18 2024-05-06 2024-06-01 2024-07-01 2024-08-05 2025-02-01 cation Selection ation upport mapping, monitoring, ngrove Management MRV and linkages with carbo n registries and the SRN ID-IEF-419309-CS-CQS / Gra nd Design Software Ecosyste Component 1. Strengthening Consultant Qualifi Under Implement m to support mapping, monit TF / B8468 Policy and Institutions for Ma Post Open - National 66,869.00 0.00 2024-03-28 2024-03-28 2024-04-18 2024-05-07 2024-06-01 2024-07-01 2024-08-05 2025-02-01 cation Selection ation oring, MRV and linkages with ngrove Management carbon registries and the SR N ID-IEF-419307-CS-CQS / Con Component 1. Strengthening Consultant Qualifi Under Implement sulting Services of GIS-Remot TF / B8468 Policy and Institutions for Ma Post Limited - National 29,167.00 0.00 2024-03-28 2024-03-31 2024-04-11 2024-05-11 2024-06-15 2024-12-12 cation Selection ation e Sensing to Improve and Up ngrove Management date PMN ID-IEF-419108-CS-CQS / Con sulting Services to gather bio Component 1. Strengthening Consultant Qualifi physics attributes of mangro TF / B8468 Policy and Institutions for Ma Post Open - National 104,167.00 0.00 Canceled 2024-06-30 2024-07-21 2024-09-03 2024-10-03 2024-11-07 2025-05-06 cation Selection ve forrest in Indonesian in rel ngrove Management ation of updating National Ma ngrove Map ID-IEF-419109-CS-CQS / Con sulting Services to gather soc Component 1. Strengthening Consultant Qualifi io-economic attributes of ma TF / B8468 Policy and Institutions for Ma Post Open - National 104,167.00 0.00 Canceled 2024-06-30 2024-07-21 2024-09-03 2024-10-03 2024-11-07 2025-05-06 cation Selection ngrove forest in Indonesian i ngrove Management n relation of updating Nation al Mangrove Map ID-IEF-419171-CS-CQS / Dev Component 1. Strengthening elopment of alogaritm and ac Consultant Qualifi TF / B8468 Policy and Institutions for Ma Post Open - National 100,000.00 0.00 Canceled 2024-06-30 2024-07-21 2024-09-03 2024-10-03 2024-11-07 2025-05-06 curacy prediction for manggr cation Selection ngrove Management ove mapping and National M angrove Map 2024 ID-IEF-436754-CS-CQS / Dev Component 1. Strengthening Consultant Qualifi Under Implement elopment of the SIGN SMART TF / B8468 Policy and Institutions for Ma Post Open - National 47,222.00 0.00 2024-06-10 2024-07-15 2024-07-01 2024-08-14 2024-09-13 2024-10-18 2025-04-16 cation Selection ation Robust Application System ngrove Management ID-IEF-453694-CS-CQS / Digi tal Analysis of Remote Sensin Component 1. Strengthening Consultant Qualifi Pending Impleme g Imagery for Mangrove Map TF / B8468 Policy and Institutions for Ma Post Limited - National 46,000.00 0.00 2024-09-30 2024-10-14 2024-11-13 2024-12-18 2025-06-16 cation Selection ntation ping for improving the 2024 ngrove Management National Mangrove Map (1.2. 1) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ID-IEF-328060-CS-INDV / (b) Component 1. Strengthening Individual Consult Financial Management Speci IBRD / 93740 Policy and Institutions for Ma Post Open - National 4,500.00 0.00 Canceled 2022-11-24 2023-01-12 2023-02-02 2023-03-09 2023-09-05 ant Selection alist PMO ngrove Management Component 1. Strengthening ID-IEF-328048-CS-INDV / (c) Individual Consult IBRD / 93740 Policy and Institutions for Ma Post Open - National 3,150.00 0.00 Canceled 2022-11-24 2023-01-12 2023-02-02 2023-03-09 2023-09-05 Admin Assistant (3 org) PMO ant Selection ngrove Management Component 1. Strengthening ID-IEF-328062-CS-INDV / (d) Individual Consult IBRD / 93740 Policy and Institutions for Ma Post Open - National 7,200.00 0.00 Canceled 2022-11-24 2023-01-12 2023-02-02 2023-03-09 2023-09-05 Fidusiary (6 org) PMO ant Selection ngrove Management Component 1. Strengthening ID-IEF-328022-CS-INDV / (e) Individual Consult IBRD / 93740 Policy and Institutions for Ma Post Open - National 1,667.00 0.00 Canceled 2022-11-24 2023-01-12 2023-02-02 2023-03-09 2023-09-05 Procurement Specialist PMO ant Selection ngrove Management ID-IEF-328083-CS-INDV / (f) Component 1. Strengthening Individual Consult Environment Safeguards Spe IBRD / 93740 Policy and Institutions for Ma Post Open - National 4,500.00 0.00 Canceled 2022-11-24 2023-01-12 2023-02-02 2023-03-09 2023-09-05 ant Selection cialist (PMO) PMO ngrove Management ID-IEF-328081-CS-INDV / (g) Component 1. Strengthening Individual Consult Social Safeguards and Gende IBRD / 93740 Policy and Institutions for Ma Post Open - National 4,500.00 0.00 Canceled 2022-11-24 2023-01-12 2023-02-02 2023-03-09 2023-09-05 ant Selection r Specialist (PMO) PMO ngrove Management Component 1. Strengthening ID-IEF-328082-CS-INDV / (i) Individual Consult IBRD / 93740 Policy and Institutions for Ma Post Open - National 4,500.00 0.00 Canceled 2022-11-24 2023-01-12 2023-02-02 2023-03-09 2023-09-05 Monitoring & Evaluation PMO ant Selection ngrove Management Component 1. Strengthening ID-IEF-328067-CS-INDV / (a) Individual Consult IBRD / 93740 Policy and Institutions for Ma Post Open - National 6,300.00 0.00 Canceled 2022-11-24 2023-01-12 2023-02-02 2023-03-09 2023-09-05 Manager PIU PDASRH ant Selection ngrove Management ID-IEF-328070-CS-INDV / (b) Component 1. Strengthening Individual Consult Financial Assistant (2 org) PI IBRD / 93740 Policy and Institutions for Ma Post Open - National 2,400.00 0.00 Canceled 2022-11-24 2023-01-12 2023-02-02 2023-03-09 2023-09-05 ant Selection U PDASRH ngrove Management Component 1. Strengthening ID-IEF-328049-CS-INDV / (a) Individual Consult IBRD / 93740 Policy and Institutions for Ma Post Open - National 6,300.00 0.00 Canceled 2022-11-24 2023-01-12 2023-02-02 2023-03-09 2023-09-05 Manager BRGM ant Selection ngrove Management Component 1. Strengthening ID-IEF-328087-CS-INDV / (b) Individual Consult IBRD / 93740 Policy and Institutions for Ma Post Open - National 4,500.00 0.00 Canceled 2022-11-24 2023-01-12 2023-02-02 2023-03-09 2023-09-05 Hydrology Specialist BRGM ant Selection ngrove Management ID-IEF-328076-CS-INDV / (c) Component 1. Strengthening Individual Consult Provincial Field Coordinator/P IBRD / 93740 Policy and Institutions for Ma Post Open - National 13,200.00 0.00 Canceled 2022-11-24 2023-01-12 2023-02-02 2023-03-09 2023-09-05 ant Selection PIU (4 org) BRGM ngrove Management ID-IEF-328085-CS-INDV / (d) Component 1. Strengthening Individual Consult Technical Coordinator (4 org) IBRD / 93740 Policy and Institutions for Ma Post Open - National 6,600.00 0.00 Canceled 2022-11-24 2023-01-12 2023-02-02 2023-03-09 2023-09-05 ant Selection BRGM ngrove Management Page 3 Component 1. Strengthening ID-IEF-328089-CS-INDV / (e) Individual Consult IBRD / 93740 Policy and Institutions for Ma Post Open - National 4,500.00 0.00 Canceled 2022-11-24 2023-01-12 2023-02-02 2023-03-09 2023-09-05 Specialist Rehabilitasi BRGM ant Selection ngrove Management ID-IEF-328084-CS-INDV / (f) Component 1. Strengthening Individual Consult Specialist DMPM (4 org) BRG IBRD / 93740 Policy and Institutions for Ma Post Open - National 18,000.00 0.00 Canceled 2022-11-24 2023-01-12 2023-02-02 2023-03-09 2023-09-05 ant Selection M ngrove Management ID-IEF-328074-CS-INDV / (g) Component 1. Strengthening Individual Consult Admin Field Koordinator (4 or IBRD / 93740 Policy and Institutions for Ma Post Open - National 4,200.00 0.00 Canceled 2022-11-24 2023-01-12 2023-02-02 2023-03-09 2023-09-05 ant Selection g) BRGM ngrove Management Component 1. Strengthening ID-IEF-328058-CS-INDV / (h) Individual Consult IBRD / 93740 Policy and Institutions for Ma Post Open - National 4,200.00 0.00 Canceled 2022-11-24 2023-01-12 2023-02-02 2023-03-09 2023-09-05 Admin (4 org) BRGM ant Selection ngrove Management ID-IEF-328063-CS-INDV / (b) Component 1. Strengthening Individual Consult Procurement specialist Keme IBRD / 93740 Policy and Institutions for Ma Post Open - National 23,300.00 0.00 Canceled 2022-11-24 2023-01-12 2023-02-02 2023-03-09 2023-09-05 ant Selection nkomarves ngrove Management Component 1. Strengthening ID-IEF-328046-CS-INDV / Saf Individual Consult IBRD / 93740 Policy and Institutions for Ma Post Open - National 36,667.00 0.00 Signed 2022-12-07 2022-11-16 2023-01-25 2023-01-11 2023-02-15 2023-01-10 2023-03-22 2023-01-21 2023-09-18 eguard Unit (2) BPLDH ant Selection ngrove Management Component 1. Strengthening ID-IEF-328045-CS-INDV / Pro Individual Consult IBRD / 93740 Policy and Institutions for Ma Post Open - National 13,333.00 0.00 Signed 2022-12-07 2022-12-09 2023-01-25 2023-01-06 2023-02-15 2023-01-20 2023-03-22 2023-01-27 2023-09-18 curement Specialist BPLDH ant Selection ngrove Management ID-IEF-328052-CS-INDV / Blu Component 1. Strengthening Individual Consult e carbon specialist Kemenko IBRD / 93740 Policy and Institutions for Ma Post Open - National 20,800.00 0.00 Signed 2022-12-07 2022-12-12 2023-01-25 2023-01-31 2023-02-15 2023-01-31 2023-03-22 2023-02-09 2023-09-18 ant Selection marves ngrove Management Component 1. Strengthening ID-IEF-328054-CS-INDV / Acc Individual Consult Under Implement IBRD / 93740 Policy and Institutions for Ma Post Open - National 15,000.00 0.00 2022-12-07 2024-05-29 2023-01-25 2023-02-15 2023-03-22 2023-09-18 ounting Specialist BPLDH ant Selection ation ngrove Management Component 1. Strengthening ID-IEF-328057-CS-INDV / Ad Individual Consult IBRD / 93740 Policy and Institutions for Ma Post Open - National 16,667.00 0.00 Signed 2022-12-07 2022-11-16 2023-01-25 2023-01-17 2023-02-15 2023-01-12 2023-03-22 2023-01-26 2023-09-18 min (2) BPLDH ant Selection ngrove Management ID-IEF-328051-CS-INDV / (c) Component 1. Strengthening Individual Consult Administration Assistant (3 o IBRD / 93740 Policy and Institutions for Ma Post Open - National 5,000.00 0.00 Canceled 2022-11-24 2023-01-12 2023-02-02 2023-03-09 2023-09-05 ant Selection rg) PIU PDASRH ngrove Management ID-IEF-328061-CS-INDV / Blu Component 1. Strengthening Individual Consult e carbon analyst (placed in M IBRD / 93740 Policy and Institutions for Ma Post Open - National 18,000.00 0.00 Signed 2022-12-07 2022-11-16 2023-01-25 2023-01-20 2023-02-15 2023-01-23 2023-03-22 2023-03-02 2023-09-18 ant Selection MAF) Kemenkomarves ngrove Management ID-IEF-328072-CS-INDV / Fin Component 1. Strengthening Individual Consult ancial management specialis IBRD / 93740 Policy and Institutions for Ma Post Open - National 13,300.00 0.00 Signed 2022-12-07 2022-11-16 2023-01-25 2023-01-11 2023-02-15 2023-01-31 2023-03-22 2023-02-01 2023-09-18 ant Selection t Kemenkomarves ngrove Management Component 1. Strengthening ID-IEF-328068-CS-INDV / Tec Individual Consult IBRD / 93740 Policy and Institutions for Ma Post Open - National 75,000.00 0.00 Signed 2022-12-07 2022-11-16 2023-01-25 2023-01-12 2023-02-15 2023-10-19 2023-03-22 2023-01-28 2023-09-18 hnical Officer (5) BPLDH ant Selection ngrove Management Component 1. Strengthening ID-IEF-328071-CS-INDV / Ad Individual Consult IBRD / 93740 Policy and Institutions for Ma Post Open - National 8,333.00 0.00 Signed 2022-12-07 2022-12-09 2023-01-25 2023-03-31 2023-02-15 2023-04-10 2023-03-22 2023-04-11 2023-09-18 min trustee BPLDH ant Selection ngrove Management ID-IEF-328075-CS-INDV / De Component 1. Strengthening Individual Consult velopment of PP on Mangrov IBRD / 93740 Policy and Institutions for Ma Post Open - National 21,000.00 0.00 Signed 2022-12-07 2022-11-16 2023-01-25 2023-01-11 2023-02-15 2023-05-04 2023-03-22 2023-07-04 2023-09-18 ant Selection e (incl. Academic Paper for P ngrove Management P) PMO ID-IEF-328080-CS-INDV / Bu Component 1. Strengthening Individual Consult dget management associate IBRD / 93740 Policy and Institutions for Ma Post Open - National 20,833.00 0.00 Signed 2022-12-07 2022-12-09 2023-01-25 2023-01-11 2023-02-15 2023-01-18 2023-03-22 2023-01-21 2023-09-18 ant Selection BPLDH ngrove Management Component 1. Strengthening ID-IEF-328078-CS-INDV / Proj Individual Consult IBRD / 93740 Policy and Institutions for Ma Post Open - National 31,667.00 0.00 Terminated 2022-12-07 2022-12-09 2023-01-25 2023-01-19 2023-02-15 2023-01-20 2023-03-22 2023-01-26 2023-09-18 ect Leader BPLDH ant Selection ngrove Management Component 1. Strengthening ID-IEF-328090-CS-INDV / Ma Individual Consult IBRD / 93740 Policy and Institutions for Ma Post Open - National 25,200.00 0.00 Terminated 2022-12-07 2022-11-16 2023-01-25 2023-01-31 2023-02-15 2023-02-06 2023-03-22 2023-02-07 2023-09-18 nager Kemenkomarves ant Selection ngrove Management ID-IEF-328091-CS-INDV / Ad Component 1. Strengthening Individual Consult ministrative assistant Kemen IBRD / 93740 Policy and Institutions for Ma Post Open - National 10,000.00 0.00 Signed 2022-12-07 2022-12-12 2023-01-25 2023-01-20 2023-02-15 2023-02-01 2023-03-22 2023-04-12 2023-09-18 2023-04-30 ant Selection komarves ngrove Management ID-IEF-328092-CS-INDV / Tec Component 1. Strengthening hnical expert to the secretari Individual Consult IBRD / 93740 Policy and Institutions for Ma Post Open - National 50,000.00 0.00 Signed 2022-12-07 2022-11-16 2023-01-25 2023-01-19 2023-02-15 2023-01-19 2023-03-22 2023-01-30 2023-09-18 at (support Pokja and technic ant Selection ngrove Management al support to the developmen t of KKMD) PMO Component 1. Strengthening ID-IEF-359576-CS-INDV / Lan Individual Consult TF / B8468 Policy and Institutions for Ma Post Open - National 25,000.00 0.00 Signed 2023-05-02 2023-06-12 2023-06-20 2023-06-26 2023-07-11 2023-07-06 2023-08-15 2023-07-06 2024-02-11 d Tenure Specialist ant Selection ngrove Management ID-IEF-361522-CS-INDV / Sys Component 1. Strengthening Individual Consult tems Manager specialist (ITS) TF / B8468 Policy and Institutions for Ma Post Open - National 50,000.00 0.00 Signed 2023-06-11 2023-08-09 2023-07-30 2023-09-14 2023-08-20 2023-10-17 2023-09-24 2023-10-17 2024-03-22 ant Selection /DBMS specialist ngrove Management Component 1. Strengthening ID-IEF-361557-CS-INDV / IT S Individual Consult TF / B8778 Policy and Institutions for Ma Post Open - National 12,500.00 0.00 Signed 2023-05-22 2023-06-06 2023-07-10 2023-06-15 2023-07-31 2023-07-10 2023-09-04 2023-07-10 2024-03-02 pecialist ant Selection ngrove Management Component 1. Strengthening ID-IEF-369516-CS-INDV / PM Individual Consult TF / B8468 Policy and Institutions for Ma Post Open - National 15,000.00 0.00 Signed 2023-06-28 2023-07-10 2023-08-16 2023-07-27 2023-09-06 2023-08-02 2023-10-11 2023-08-02 2024-04-08 O Manager_PDARSH ant Selection ngrove Management ID-IEF-369518-CS-INDV / Soc Component 1. Strengthening Individual Consult ial Safeguards and Gender S TF / B8468 Policy and Institutions for Ma Post Open - National 9,000.00 0.00 Completed 2023-06-28 2023-07-11 2023-08-16 2023-07-20 2023-09-06 2023-08-07 2023-10-11 2023-08-07 2024-04-08 2023-12-31 ant Selection pecialist ngrove Management Component 1. Strengthening ID-IEF-369519-CS-INDV / Ad Individual Consult TF / B8468 Policy and Institutions for Ma Post Open - National 2,100.00 0.00 Signed 2023-06-28 2023-07-04 2023-08-16 2023-09-27 2023-09-06 2023-10-19 2023-10-11 2023-10-18 2024-04-08 ministrator-PMO KLHK ant Selection ngrove Management Page 4 Component 1. Strengthening ID-IEF-369524-CS-INDV / Ma Individual Consult TF / B8468 Policy and Institutions for Ma Post Open - National 12,600.00 0.00 Signed 2023-06-28 2023-07-04 2023-08-16 2023-09-27 2023-09-06 2023-10-09 2023-10-11 2023-10-17 2024-04-08 nager PIU -RPDM ant Selection ngrove Management Component 1. Strengthening ID-IEF-369528-CS-INDV / Ad Individual Consult Under Implement TF / B8468 Policy and Institutions for Ma Post Open - National 2,700.00 0.00 2023-06-28 2023-06-23 2023-08-16 2023-09-06 2023-10-11 2024-04-08 ministration Assistant-PIU ant Selection ation ngrove Management Component 1. Strengthening ID-IEF-360269-CS-INDV / Saf Individual Consult Under Implement TF / B8468 Policy and Institutions for Ma Post Open - National 18,000.00 0.00 2023-05-19 2023-05-19 2023-07-07 2023-07-28 2023-09-01 2024-02-28 eguards specialist ant Selection ation ngrove Management Component 1. Strengthening ID-IEF-369525-CS-INDV / GIS Individual Consult TF / B8468 Policy and Institutions for Ma Post Open - National 4,200.00 0.00 Signed 2023-07-14 2023-06-26 2023-09-01 2023-08-11 2023-09-22 2023-09-11 2023-10-27 2023-09-11 2024-04-24 Expert PIU-RPDM ant Selection ngrove Management Component 1. Strengthening ID-IEF-361521-CS-INDV / Re Individual Consult TF / B8468 Policy and Institutions for Ma Post Open - National 50,000.00 0.00 Signed 2023-08-09 2023-10-20 2023-09-27 2023-09-27 2023-10-18 2023-11-30 2023-11-22 2023-11-30 2024-05-20 mote Sensing Specialists ant Selection ngrove Management Component 1. Strengthening ID-IEF-369527-CS-INDV / IT E Individual Consult TF / B8468 Policy and Institutions for Ma Post Open - National 4,200.00 0.00 Signed 2023-07-24 2023-07-24 2023-09-11 2023-09-15 2023-10-02 2023-10-17 2023-11-06 2023-10-17 2024-05-04 xpert-PIU RPDM ant Selection ngrove Management Component 1. Strengthening ID-IEF-361543-CS-INDV / Tec Individual Consult TF / B8468 Policy and Institutions for Ma Post Open - National 60,000.00 0.00 Canceled 2023-06-11 2023-09-18 2023-07-30 2023-08-20 2023-09-24 2024-03-22 hnical specialists SRN ant Selection ngrove Management ID-IEF-403839-CS-INDV / Tec Component 1. Strengthening Individual Consult Under Implement hnical Specialists IT SRN-KLH TF / B8468 Policy and Institutions for Ma Post Open - National 12,986.00 0.00 2024-01-19 2024-02-01 2024-03-08 2024-03-29 2024-05-03 2024-10-30 ant Selection ation K ngrove Management ID-IEF-403842-CS-INDV / Tec Component 1. Strengthening Individual Consult Under Implement hnical Specialist Forestry SR TF / B8468 Policy and Institutions for Ma Post Open - National 9,167.00 0.00 2024-01-19 2024-02-01 2024-03-08 2024-03-29 2024-05-03 2024-10-30 ant Selection ation N-KLHK ngrove Management Component 1. Strengthening ID-IEF-404918-CS-INDV / Sen Individual Consult Under Implement TF / B8778 Policy and Institutions for Ma Post Open - National 27,778.00 0.00 2023-11-30 2023-11-30 2024-01-18 2024-02-08 2024-03-14 2024-09-10 ior Expert Forestry for NFI ant Selection ation ngrove Management ID-IEF-404917-CS-INDV / We Component 1. Strengthening Individual Consult Under Implement b and Forest Database Mana TF / B8778 Policy and Institutions for Ma Post Open - National 17,361.00 0.00 2023-11-30 2023-11-30 2024-01-18 2024-02-08 2024-03-14 2024-09-10 ant Selection ation gement Expert ngrove Management Component 1. Strengthening ID-IEF-404920-CS-INDV / GIS Individual Consult Under Implement TF / B8778 Policy and Institutions for Ma Post Open - National 13,889.00 0.00 2023-11-30 2023-11-30 2024-01-18 2024-02-08 2024-03-14 2024-09-10 Analyst Expet ant Selection ation ngrove Management Component 1. Strengthening ID-IEF-404919-CS-INDV / For Individual Consult TF / B8778 Policy and Institutions for Ma Post Open - National 10,417.00 0.00 Canceled 2023-11-30 2023-11-30 2024-01-18 2024-02-08 2024-03-14 2024-09-10 est Officer ant Selection ngrove Management Component 1. Strengthening ID-IEF-404923-CS-INDV / PIU Individual Consult TF / B8468 Policy and Institutions for Ma Post Open - National 25,200.00 0.00 Signed 2023-10-26 2023-10-26 2023-12-14 2024-01-18 2024-01-04 2024-02-15 2024-02-08 2024-02-07 2024-08-06 Manager Kemenkomarinvest ant Selection ngrove Management Component 1. Strengthening ID-IEF-404921-CS-INDV / Proj Individual Consult Under Implement TF / B8778 Policy and Institutions for Ma Post Open - National 31,920.00 0.00 2023-12-20 2023-12-20 2024-02-07 2024-02-28 2024-04-03 2024-09-30 ect Leader-PMU M4CR BPDLH ant Selection ation ngrove Management ID-IEF-369535-CS-INDV / Cla rification of the governance Component 1. Strengthening Individual Consult mechanism for the mangrove TF / B8468 Policy and Institutions for Ma Post Open - National 30,000.00 0.00 Canceled 2024-03-31 2024-05-19 2024-06-09 2024-07-14 2025-01-10 ant Selection monitoring system develope ngrove Management d under 1.3 (c) and 1.3 (d) ID-IEF-369531-CS-INDV / Ov Component 1. Strengthening Individual Consult erall mangroves communicat TF / B8468 Policy and Institutions for Ma Post Open - National 30,000.00 0.00 Canceled 2024-03-31 2024-05-19 2024-06-09 2024-07-14 2025-01-10 ant Selection ion support ngrove Management ID-IEF-403841-CS-INDV / IT J Component 1. Strengthening Individual Consult Under Implement unior Specialists Forestry SR TF / B8468 Policy and Institutions for Ma Post Open - National 13,750.00 0.00 2024-01-19 2023-11-01 2024-03-08 2024-03-29 2024-05-03 2024-10-30 ant Selection ation N-KLHK (2 person) ngrove Management Component 1. Strengthening ID-IEF-403840-CS-INDV / IT J Individual Consult Under Implement TF / B8468 Policy and Institutions for Ma Post Open - National 13,750.00 0.00 2024-01-19 2023-11-01 2024-03-08 2024-03-29 2024-05-03 2024-10-30 unior for Inventory (2 person) ant Selection ation ngrove Management Component 1. Strengthening ID-IEF-419328-CS-INDV / Pro Individual Consult TF / B8468 Policy and Institutions for Ma Post Open - National 13,333.00 0.00 Signed 2024-03-27 2024-03-27 2024-05-15 2024-04-26 2024-06-05 2024-05-22 2024-07-10 2024-07-01 2025-01-06 curement Specialist ant Selection ngrove Management ID-IEF-419977-CS-INDV / Soc Component 1. Strengthening Individual Consult Under Implement ial Safeguard Specialist-PMU TF / B8468 Policy and Institutions for Ma Post Open - National 20,418.00 0.00 2024-04-02 2024-06-10 2024-05-21 2024-06-11 2024-07-16 2025-01-12 ant Selection ation M4CR ngrove Management ID-IEF-436734-CS-INDV / Co Component 1. Strengthening nsultant for the development Individual Consult Pending Impleme TF / B8468 Policy and Institutions for Ma Post Open - National 41,379.00 0.00 2024-06-10 2024-07-29 2024-08-19 2024-09-23 2025-03-22 of regional regulation in 4 (fo ant Selection ntation ngrove Management ur) province in relation to PP mangrove ID-IEF-436735-CS-CDS / Con Component 1. Strengthening sultant for community engga Direct - Internation Under Implement TF / B8468 Policy and Institutions for Ma Post Direct Selection 13,793.00 0.00 2024-06-10 2024-07-23 2024-06-20 2024-08-24 2025-02-20 ment and development for m al ation ngrove Management angrove ecosystem protectio n and management ID-IEF-436736-CS-INDV / Tec Component 1. Strengthening hnical expert to the secretari Individual Consult Under Implement TF / B8468 Policy and Institutions for Ma Post Open - National 10,345.00 0.00 2024-06-10 2024-07-23 2024-07-29 2024-08-19 2024-09-23 2025-03-22 at (support pokja and technic ant Selection ation ngrove Management al support to the developmen t of KKMD) ID-IEF-436738-CS-INDV / Co Component 1. Strengthening nsultant for analytics on man Individual Consult Under Implement TF / B8468 Policy and Institutions for Ma Post Open - National 13,793.00 0.00 2024-06-10 2024-06-03 2024-07-29 2024-08-19 2024-09-23 2025-03-22 groves tenure issue and guidi ant Selection ation ngrove Management ng to incorporate relevant po licies ID-IEF-436742-CS-INDV / Exp ert in analytics and mapping Component 1. Strengthening of cases and formulating gui Individual Consult Under Implement TF / B8468 Policy and Institutions for Ma Post Open - National 13,793.00 0.00 2024-06-10 2024-07-23 2024-07-29 2024-08-19 2024-09-23 2025-03-22 delines for case handling and ant Selection ation ngrove Management law enforcement of mangrove ec osystem protection Page 5 Component 1. Strengthening ID-IEF-436743-CS-INDV / IT/ Individual Consult Pending Impleme TF / B8468 Policy and Institutions for Ma Post Open - National 10,345.00 0.00 2024-06-10 2024-07-29 2024-08-19 2024-09-23 2025-03-22 DBMS Specialist ant Selection ntation ngrove Management ID-IEF-436744-CS-INDV / Tec Component 1. Strengthening Individual Consult Under Implement hnical Specialist Waste Secto TF / B8468 Policy and Institutions for Ma Post Open - National 8,276.00 0.00 2024-06-10 2024-07-10 2024-07-29 2024-08-19 2024-09-23 2025-03-22 ant Selection ation r ngrove Management ID-IEF-436747-CS-INDV / Tec Component 1. Strengthening Individual Consult Under Implement hnical Specialist AFOLU Secto TF / B8468 Policy and Institutions for Ma Post Open - National 8,276.00 0.00 2024-06-10 2024-07-10 2024-07-29 2024-08-19 2024-09-23 2025-03-22 ant Selection ation r ngrove Management ID-IEF-436751-CS-INDV / Tec Component 1. Strengthening Individual Consult Under Implement hnical Specialist Energy Sect TF / B8468 Policy and Institutions for Ma Post Open - National 8,276.00 0.00 2024-06-10 2024-07-29 2024-08-19 2024-09-23 2025-03-22 ant Selection ation or ngrove Management Component 1. Strengthening ID-IEF-436753-CS-INDV / Tec Individual Consult Under Implement TF / B8468 Policy and Institutions for Ma Post Open - National 8,276.00 0.00 2024-06-10 2024-07-29 2024-08-19 2024-09-23 2025-03-22 hnical Specialist IPPU Sector ant Selection ation ngrove Management Component 1. Strengthening ID-IEF-436757-CS-INDV / For Individual Consult Under Implement TF / B8468 Policy and Institutions for Ma Post Open - National 10,417.00 0.00 2024-06-10 2023-11-24 2024-07-29 2024-08-19 2024-09-23 2025-03-22 est Officer ant Selection ation ngrove Management ID-IEF-438515-CS-INDV / Ge ospatial Database Technical Component 1. Strengthening Assistant Staff For Strenghte Individual Consult Under Implement TF / B8468 Policy and Institutions for Ma Post Open - National 15,000.00 0.00 2024-07-12 2024-07-23 2024-08-30 2024-09-20 2024-10-25 2025-04-23 ning Geospatial Information I ant Selection ation ngrove Management nfrastructure to Support Nati onal Mangrove Map System management (1.3.3.c) ID-IEF-438513-CS-INDV / GIS Programming Technical Assis Component 1. Strengthening tant For Strengthening Geos Individual Consult Under Implement TF / B8468 Policy and Institutions for Ma Post Open - National 15,000.00 0.00 2024-07-12 2024-07-23 2024-08-30 2024-09-20 2024-10-25 2025-04-23 patial Information Infrastruct ant Selection ation ngrove Management ure to Support National Mang rove Map System Managem ent (1.3.3.c) Component 1. Strengthening ID-IEF-439160-CS-INDV / Blu Individual Consult Under Implement TF / B8468 Policy and Institutions for Ma Post Open - National 18,333.00 0.00 2024-07-16 2024-07-16 2024-09-03 2024-09-24 2024-10-29 2025-04-27 e Carbon Specialist (1.4.1.B) ant Selection ation ngrove Management ID-IEF-436730-CS-INDV / ST RENGTHENING COORDINATI Component 1. Strengthening ON AND GOVERNANCE MECH Individual Consult Pending Impleme TF / B8468 Policy and Institutions for Ma Post Open - National 10,345.00 0.00 2024-06-10 2024-07-29 2024-08-19 2024-09-23 2025-03-22 ANISM OF MANGROVE ECOSY ant Selection ntation ngrove Management STEM AT NATIONAL LEVEL - National Consultant (output b ased) - RPDM Page 6