PROCUREMENT PLAN Version 1.6– Date: June 14, 2021 IMPROVEMENT OF SOLID WASTE MANAGEMENT TO SUPPORT REGIONAL AREA AND METROPOLITAN CITIES PROJECT A. Project information: Country: Indonesia Borrower: Republic of Indonesia Project ID: P157245 Financing Agreement IBRD Loan 9024-ID Number: Project Implementation Agency(ies): CPMU Ministry of Public Works and Housing (MPWH), Directorate : General of Human Settlement (DGHS) CPIU: Directorate of Development for Environmental Sanitation (PPLP), DGHS, Ministry of Public Works and Housing (MPWH) Directorate for Development of Urban, Housing and Settlement Areas, Deputy for Regional Development, Ministry of National Development Planning/BAPPENAS Directorate General of Regional Development, Directorate of SUPD II, Mistry of Home Affairs (MOHA) Directorate for Waste Management, Directorate General of PSBL3Ministry of Environment and Forestry (MoEF) B. Key Dates: 1. Procurement Plan: a. Version 1.0 (for Aug 19, 2019 negotiation) Bank’s Approval to this Aug 29, 2019 version: Period covered by this Dec 1, 2019 – December 31, version: 2020 b. Version 1.6 (previous June 13, 2021 version) Bank’s Approval to this June 14, 2021 version: Period covered by this Dec 1, 2019 – Nov 30, 2025 version: c. Version 1.7 (this version) March 15, 2022 Bank’s Approval to this March 16, 2022 version: Period covered by this Dec 1, 2019 – Nov 30, 2025 version: d. [next version, if any] [to be updated] 2. General Procurement June 19, 2020 Notice: C. Preamble All Procurement under the Project shall be carried out in accordance with the World Bank’s Procurement Regulations for IPF Borrowers of July 2016, revised November 2017 and August 2018, and the provisions of the Procurement Plan and Project Operations Manual and shall take precedence over any national procurement regulations. In accordance with paragraph 5.9 of the Procurement Regulations, the Bank’s online procurement planning and tracking tools i.e., Systematic Tracking and Exchanges in Procurement (STEP) will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. D. Key Provisions The following conditions apply to all procurement activities in this Procurement Plan. The Bank’s procurement prior review thresholds: The identified procurement risk under this Project is ‘Substantial’. Accordingly, all contracts listed in the Procurement Plan that are at or above the thresholds set out below are subject to the Bank’s prior review. All other contracts are subject to the Bank’s ex-post review. Table 1. Applied Prior Review Threshold Type of procurement Procurement Prior Review Thresholds (US$ millions) Works (including turnkey, supply & installation of 10 plant and equipment, and PPP) Goods, information technology and non- 2 consulting services Consultants: firms 1 Consultants: individuals 0.3 The Bank’s approved selection methods thresholds: The following selection method thresholds shall apply for procurement of goods & information technology, non-consulting services and consulting services of each identified activity. Table 2. Applied Approved Selection Method Threshold Type of procurement and Approved Selection Method Thresholds Approved Selection (US$ millions) Method National International Works (including turnkey, supply & installation of plant and equipment, and PPP) (i) Request for Request for at or above $0.2 and at or above $25 Bids (RFB) less than $25 (ii) Request for Quotations less than $0.2 N/A (RFQ) (iii) Direct Selection On exceptional basis On exceptional basis if justified as per if justified as per paragraph 6.8, 6.9 paragraph 6.8, 6.9 and 6.10 of the and 6.10 of the Procurement Procurement Regulations Regulations Goods, Information Technology and Non-consulting services a. For Goods and Information Technology: (i) Request for Request for at or above $0.1 and at or above $2 Bids (RFB) less than $2 Type of procurement and Approved Selection Method Thresholds Approved Selection (US$ millions) Method National International (ii) Request for Quotations less than $0.1 N/A (RFQ) (iii) Direct Selection On exceptional basis On exceptional basis if justified as per if justified as per paragraph 6.8, 6.9 paragraph 6.8, 6.9 and 6.10 of the and 6.10 of the Procurement Procurement Regulations Regulations b. For Non-consulting Services: (i) Request for Request for at or above $0.1 and at or above $10 Bids (RFB) less than $10 (ii) Request for Quotations less than $0.1 N/A (RFQ) (iii) Direct Selection On exceptional basis On exceptional basis if justified as per if justified as per paragraph 6.8, 6.9 paragraph 6.8, 6.9 and 6.10 of the and 6.10 of the Procurement Procurement Regulations Regulations Consultants: firms a. For Selection of Consulting Firms (i) Quality Cost Based At or above $0.3. at or above $0.4 Selection (QCBS), Fixed Shortlist of firms for Budget Based Selection contracts below $0.4 (FBS), Least Cost Based may comprise Selection (LCS) and entirely national Quality Based Selection firms (QBS) (ii) Consultant’s less than $0.3 N/A Qualifications Based Selection (CQS) (iii) Direct Selection On exceptional basis On exceptional basis if justified as per if justified as per paragraph 7.13, 7.14 paragraph 7.13, 7.14 and 7.15 of the and 7.15 of the Procurement Procurement Regulations Regulations b. For Selection of Individual Consultants Type of procurement and Approved Selection Method Thresholds Approved Selection (US$ millions) Method National International (i) Open Competitive All, no monetary All, no monetary Selection of Individual threshold threshold Consultants and Limited Competitive Selection of Individual Consultants (ii) Direct Selection of On exceptional basis On exceptional basis Individual Consultants if justified as per if justified as per paragraph 7.39 of paragraph 7.39 of the Procurement the Procurement Regulations Regulations Standard Procurement Documents (SPD): The Bank’s SPD shall be used when approaching the international market (specifically for international competitive procurement and those contracts shall be as specified in the Procurement Plan tables in STEP. Use of National Procurement Procedures: In accordance with paragraphs 5.3 of the Procurement Regulations, when approaching the national market all contracts to be procured through open national competitive procurement will follow the GoI’s procurement regulation. The procedures applicable to the procurement of goods and non-consulting services awarded on the basis of open national competitive procurement shall be those of the Tender method as set forth in the Peraturan Presiden No. 16/2018 and its subsequent amendment Peraturan Presiden No. 12/2021) provided that such arrangements continue to meet requirements set forth under paragraph 5.4 of these Regulations and the following conditions: 1. The procurement is open to eligible firms from any country. There shall not any restriction to the bidders’ participation including mandatory requirement to form in joint venture; 2. Any gaps between National Procurement Procedures and the Procurement Regulations will be addressed and incorporated in the harmonized bidding documents acceptable by the Bank. Use of National e-Procurement System (SPSE): Unless informed otherwise by the Bank in writing, SPSE e-procurement system may be used only for procurement of works, goods and non-consulting services under Request for Bids (RFB) method through national open competitive procurement method, applying the harmonized model bidding documents for national open competitive procurement agreed by the Bank. For selection of consulting services through QCBS method, only the modified SPSE (termed by LKPP as SPSE-“ICB”) may be used applying the Bank’s Standard Request for Proposal (RFP) document. The Bank has further accepted MPWH’s proposal for use of SPSE-ICB for selection of consulting services through CQS method applying a modified Bank’s Standard RFP. Since at the present time LKPP has not yet developed the modified SPSE for procurement of goods, works and non-consulting services under international open Competitive method, nor for selection of consulting services under QBS, LCS, FBS, and individual consultant selection methods, therefore procurement of all contract packages under these methods shall be carried out through non-electronic process with manual issuance of specific procurement notice (request for expression of interest or invitation for bids/proposals and receipt of bids/proposals), until such time that the modified SPSE has been completed by LKPP and assessed by the Bank to be acceptable. If the Bank determines the modified SPSE to be acceptable for use under the above-mentioned remaining procurement methods, the Bank will confirm through the Bank’s written no objection to LKPP and will also notify in writing to CMPU/CPIUs. Use of National e-Catalogue System. Based on the Bank’s assessment of the national e-catalogue system, the Bank allows the Project Implementing Units (PIUs) under World Bank financed projects to use the national e- catalogue for procurement of small value of goods in lieu of the Request for Quotations (RFQ) method specified in these Regulations within the parameters as below: a) For Goods (other than medicines) with estimated cost not more than USD 15,000 equivalent per contract. PIUs may use the national e-catalogue for procuring such items of goods within the above-specified threshold, if such goods are required under the project and specified in the Procurement Plan approved by the Bank. b) Goods (other than medicines) with estimated cost greater than USD 15,000 but less than USD 100,000 equivalent per contract. PIUs may use the national e-catalogue for procuring such items of goods if such goods are required under the project subject to fulfilling the following additional procedural requirement as below: PIU shall carry out a secondary procurement process through mini competition, by comparing the prices of similar goods offered by at least three different suppliers which available in the national e-catalogue and then selecting the Supplier with the lowest evaluated price on the basis of “as delivered" price at final destination (i.e., including inland transportation, insurance, applicable taxes and any other incidental charges for the delivery of the required quantity of goods at final destination). E. Other Relevant Procurement Information • Project Operational Manual (POM) shall set out the operating procedures for procurement and contract implementation matters under the Project written in Bahasa, which shall be consistent with the procedures and rules specified under the Bank’s Procurement Regulations. In case of any difference of interpretation between the POM and the Bank’s Procurement Regulations, the later shall prevail; • CPMU and CPIUs may use its own forms of contract for goods/non- consulting services procured under Request for Quotations (RFQ) method when approaching to national market, acceptable to the Bank; • Advance procurement may be applied under the project and shall be valid by signing of the Loan Agreement. CPMU and CPIUs may commence the procurement process prior to issuance of the DIPA for any anticipated activity to be procured under the Project, while signing of the contract shall be subject to issuance of the DIPA of the respective activity. All contracts shall not be designed as single-year contract, and therefore procurement process shall continue throughout multiple calendar years without limitation of contract period up to end of the GoI’s fiscal year; • Regardless of the Bank’s review requirement (prior or post), the Bank may review technical aspects of procurement documents and other non- procurement matters (terms of reference, statement of works, technical specifications, environmental documents, cost estimate, etc.) related to the procurement activity in question, if needed; • The Bank will continue to provide guidance and support to CPMU and CPIUs for procurement processing through the STEP. • Project Implementation Support Personnel as defined in the PPSD shall not be included in this Procurement Plan. Their selection and hiring procedures shall continue to apply the GoI’s selection and hiring procedures as further defined in the POM. The Procurement Plan is a living document and can be revised if there are any changes during the implementation of the project. PROCUREMENT Indonesia : Improvement of Solid Waste Management to Support Regional and Metropolitan Cities PLAN General Information Country: Indonesia 2023-10-03 Bank’s Approval Date of the Original Procurement Plan: 2024-10-05 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P157245 GPN Date: 2020-06-18 Project Name: Improvement of Solid Waste Management to Support Regional and Metropolitan Cities Loan / Credit No: IBRD / 90240 Balai Prasarana Permukiman Wilayah Jawa Barat Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned National Procure ID-BPPW JAWA BARAT-44721 ment Document - 0-CW-RFB / Integrated Constr Solid Waste Infrastructure in Single Stage - Two E Under Imple 2025-11-2 IBRD / 90240 Post Request for Bids Open - National 2 Envelope proce 7,508,000.00 0.00 2024-08-23 2024-09-17 2024-09-21 2024-09-22 2024-09-06 2024-09-17 2024-10-07 2024-10-20 2024-11-03 uction Design and Build of TP Selected Cities nvelope mentation 8 ss (Non Bank-SPD ST Indramayu District ) National Procure ID-BPPW JAWA BARAT-44721 ment Document - Solid Waste Infrastructure in Single Stage - Two E Under Imple 2025-11-2 6-CW-RFB / Integrated Constr IBRD / 90240 Post Request for Bids Open - National 2 Envelope proce 9,261,000.00 0.00 2024-08-23 2024-09-03 2024-09-21 2024-09-22 2024-09-06 2024-09-17 2024-10-07 2024-10-20 2024-11-03 Selected Cities nvelope mentation 8 uction Design and Build of TP ss (Non Bank-SPD ST Bandung City ) National Procure ID-BPPW JAWA BARAT-44721 ment Document - Solid Waste Infrastructure in Single Stage - Two E Under Imple 2025-11-2 3-CW-RFB / Integrated Constr IBRD / 90240 Post Request for Bids Open - National 2 Envelope proce 8,343,000.00 0.00 2024-08-23 2024-09-17 2024-09-21 2024-09-22 2024-09-06 2024-09-17 2024-10-07 2024-10-20 2024-11-03 Selected Cities nvelope mentation 8 uction Design and Build of TP ss (Non Bank-SPD ST In Depok City ) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ID-BPPW JAWA BARAT-42562 8-GO-DIR / Procurement of W aste Collection Infrastructure Solid Waste Infrastructure in Request for Quota Single Stage - One E IBRD / 90240 Post Limited - National 68,500.00 0.00 Completed 2023-02-17 2023-02-17 2023-02-24 2023-02-24 2023-04-16 2023-04-06 (Trash Motorbikes) Cicukang Selected Cities tions nvelope Holis TPST Bandung City and Oxbow Mekarrahayu TPST Ba ndung Regency ID-BPPW JAWA BARAT-42563 1-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E aste Collection Infrastructure IBRD / 90240 Post Limited - National 73,900.00 0.00 Completed 2023-02-17 2023-02-17 2023-02-24 2023-02-24 2023-04-29 2023-04-29 Selected Cities tions nvelope (Trash Motorbikes) at Tegalle ga TPST, Bandung City and L ebaksaat TPST, Cimahi City ID-BPPW JAWA BARAT-42562 5-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E aste Collection Infrastructure IBRD / 90240 Post Limited - National 60,300.00 0.00 Completed 2023-02-17 2023-02-17 2023-02-24 2023-02-24 2023-04-01 2023-04-01 Selected Cities tions nvelope (Trash Motorbikes) for TPST Nyengseret Bandung City ID-BPPW JAWA BARAT-42562 7-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E IBRD / 90240 Post Limited - National 82,100.00 0.00 Completed 2023-02-17 2023-02-17 2023-02-24 2023-02-24 2023-04-18 2023-04-18 aste Collection Infrastructure Selected Cities tions nvelope (Trash Motorbikes) at Cicabe TPST Bandung City ID-BPPW JAWA BARAT-42563 0-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E IBRD / 90240 Post Limited - National 82,100.00 0.00 Completed 2023-02-17 2023-02-17 2023-02-24 2023-02-24 2023-04-29 2023-04-13 aste Collection Infrastructure Selected Cities tions nvelope (Trash Motorbikes) at Sention g TPST Cimahi City ID-BPPW JAWA BARAT-42564 1-GO-DIR / Procurement of W aste Collection Infrastructure Solid Waste Infrastructure in Request for Quota Single Stage - One E IBRD / 90240 Post Limited - National 70,700.00 0.00 Completed 2023-03-13 2023-03-13 2023-03-24 2023-03-24 2023-05-16 2023-05-16 (Pick Up Cars) Cicukang Holis Selected Cities tions nvelope TPST Bandung City and Oxbo w Mekarrahayu TPST Bandun g Regency ID-BPPW JAWA BARAT-42563 8-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E aste Collection Infrastructure IBRD / 90240 Post Limited - National 84,800.00 0.00 Signed 2023-03-13 2023-03-13 2023-03-24 2023-03-24 2023-05-16 Selected Cities tions nvelope (Pick Up Cars) at Tegallega T PST Bandung City and Lebak saat TPST Cimahi City ID-BPPW JAWA BARAT-42564 0-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E IBRD / 90240 Post Limited - National 56,600.00 0.00 Completed 2023-03-13 2023-03-13 2023-03-24 2023-03-24 2023-05-16 2023-05-16 aste Collection Infrastructure Selected Cities tions nvelope (Pick Up Cars) at Nyengseret TPST Bandung City ID-BPPW JAWA BARAT-42564 4-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E IBRD / 90240 Post Limited - National 84,800.00 0.00 Completed 2023-03-13 2023-03-13 2023-03-24 2023-03-24 2023-05-16 2023-05-16 aste Collection Infrastructure Selected Cities tions nvelope (Pick Up Cars) at Cicabe TPST Bandung City ID-BPPW JAWA BARAT-42564 2-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E IBRD / 90240 Post Limited - National 84,800.00 0.00 Completed 2023-03-13 2023-03-13 2023-03-24 2023-03-24 2023-05-16 2023-05-16 aste Collection Infrastructure Selected Cities tions nvelope (Pick Up Cars) at Sentiong TP ST Cimahi City ID-BPPW JAWA BARAT-42563 4-GO-DIR / Procurement of R esidue Transport Infrastructu Solid Waste Infrastructure in Request for Quota Single Stage - One E IBRD / 90240 Post Limited - National 82,400.00 0.00 Completed 2023-03-24 2023-03-24 2023-03-29 2023-03-29 2023-06-24 2023-06-24 re (Armroll Truck) for the Cic Selected Cities tions nvelope ukang Holis TPST, Bandung C ity and the Mekarrahayu Oxb ow TPST, Bandung Regency ID-BPPW JAWA BARAT-42563 7-GO-DIR / Procurement of R Solid Waste Infrastructure in Request for Quota Single Stage - One E esidue Transport Infrastructu IBRD / 90240 Post Limited - National 82,400.00 0.00 Completed 2023-03-24 2023-03-24 2023-03-29 2023-03-29 2023-06-24 2023-06-24 Selected Cities tions nvelope re (Armroll Truck) for Tegalle ga TPST Bandung City and Le baksaat TPST Cimahi City ID-BPPW JAWA BARAT-42563 2-GO-DIR / Procurement of R Solid Waste Infrastructure in Request for Quota Single Stage - One E esidue Transport Infrastructu IBRD / 90240 Post Limited - National 82,400.00 0.00 Completed 2023-03-24 2023-03-24 2023-03-29 2023-03-29 2023-06-24 2023-06-24 Selected Cities tions nvelope re Facilities (Armroll Truck) fo r Nyengeseret TPST Bandung City Page 1 ID-BPPW JAWA BARAT-42563 3-GO-DIR / Procurement of R Solid Waste Infrastructure in Request for Quota Single Stage - One E IBRD / 90240 Post Limited - National 82,400.00 0.00 Completed 2023-03-24 2023-03-24 2023-03-29 2023-03-29 2023-06-24 2023-06-24 esidue Transport Infrastructu Selected Cities tions nvelope re (Armroll Truck) for TPST Ci cabe, Bandung City ID-BPPW JAWA BARAT-42563 6-GO-DIR / Procurement of R Solid Waste Infrastructure in Request for Quota Single Stage - One E IBRD / 90240 Post Limited - National 82,400.00 0.00 Completed 2023-03-24 2023-03-24 2023-03-29 2023-03-29 2023-06-24 2023-06-24 esidue Transport Infrastructu Selected Cities tions nvelope re (Armroll Truck) at Sention g TPST Cimahi City ID-BPPW JAWA BARAT-42562 6-GO-DIR / Procurement of W aste Collection Infrastructure Solid Waste Infrastructure in Request for Quota Single Stage - One E Under Imple IBRD / 90240 Post Limited - National 11,100.00 0.00 2023-03-15 2023-03-15 2023-04-12 2023-05-12 (Wheelie Bin) at Cicukang Ho Selected Cities tions nvelope mentation lis TPST Bandung City and Ox bow Mekarrahayu TPST Band ung Regency ID-BPPW JAWA BARAT-42546 6-GO-DIR / Procurement of W aste Collection Infrastructure Solid Waste Infrastructure in Request for Quota Single Stage - One E IBRD / 90240 Post Limited - National 30,900.00 0.00 Signed 2023-05-03 2023-05-03 2023-05-17 2023-06-16 (Containers) for TPST Tegalle Selected Cities tions nvelope ga, Nyengseret, Cicabe, Ban dung City and TPST Sentiong, Lebaksaat, Cimahi City ID-BPPW JAWA BARAT-42547 3-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E aste Collection Infrastructure IBRD / 90240 Post Limited - National 14,200.00 0.00 Completed 2023-04-20 2023-04-26 2023-05-04 2023-05-09 2023-06-18 2023-05-26 Selected Cities tions nvelope (Pick Up Mini Dump Truck) TP ST Mekarjati, Regency Kara wang ID-BPPW JAWA BARAT-42546 9-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E aste Collection Infrastructure IBRD / 90240 Post Limited - National 41,700.00 0.00 Completed 2023-04-10 2023-04-07 2023-04-22 2023-05-09 2023-06-06 2023-06-09 Selected Cities tions nvelope (Arm Roll Truck and Containe r) TPST Mekarjati, Karawang Regency ID-BPPW JAWA BARAT-42547 4-GO-DIR / Procurement of G Solid Waste Infrastructure in Request for Quota Single Stage - One E arbage Collection Infrastruct IBRD / 90240 Post Limited - National 14,200.00 0.00 Completed 2023-04-20 2023-04-17 2023-05-02 2023-05-09 2023-06-16 2023-06-02 Selected Cities tions nvelope ure (Pick Up Mini Dump Truck ) Cirejag TPST, Karawang Re gency ID-BPPW JAWA BARAT-42562 3-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E aste Collection Infrastructure IBRD / 90240 Post Limited - National 43,100.00 0.00 Completed 2023-05-18 2023-04-17 2023-06-10 2023-05-09 2023-07-25 2023-06-26 Selected Cities tions nvelope (Arm Roll Truck and Containe r) Cirejag TPST, Karawang Re gency ID-BPPW JAWA BARAT-42547 1-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E aste Collection Infrastructure IBRD / 90240 Post Limited - National 14,200.00 0.00 Completed 2023-04-10 2023-04-17 2023-04-24 2023-05-09 2023-06-08 2023-05-27 Selected Cities tions nvelope (Pick Up Mini Dump Truck) at Nagrak TPST, Purwakarta Re gency ID-BPPW JAWA BARAT-42562 2-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E aste Collection Infrastructure IBRD / 90240 Post Limited - National 43,100.00 0.00 Completed 2023-04-20 2023-04-17 2023-05-02 2023-05-10 2023-06-16 2023-06-22 Selected Cities tions nvelope (Arm Roll Trucks and Contain ers) at Nagrak TPST, Purwaka rta Regency ID-BPPW JAWA BARAT-42547 6-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E aste Collection Infrastructure IBRD / 90240 Post Limited - National 14,200.00 0.00 Completed 2023-04-10 2023-04-06 2023-05-03 2023-05-09 2023-06-17 2023-05-27 Selected Cities tions nvelope (Pick Up Mini Dump Truck) at Sukatani TPST, Purwakarta R egency ID-BPPW JAWA BARAT-42562 4-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E aste Collection Infrastructure IBRD / 90240 Post Limited - National 43,000.00 0.00 Completed 2023-05-18 2023-05-15 2023-06-10 2023-05-29 2023-07-25 2023-06-26 Selected Cities tions nvelope (Arm Roll Trucks and Contain ers) at Sukatani TPST, Purwa karta Regency ID-BPPW JAWA BARAT-42561 8-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E aste Collection Infrastructure IBRD / 90240 Post Limited - National 49,100.00 0.00 Completed 2023-04-10 2023-04-11 2023-04-22 2023-05-04 2023-06-21 2023-05-26 Selected Cities tions nvelope (Trash Motorbikes) TPST RDF Jayakerta, Karawang Regenc y ID-BPPW JAWA BARAT-42547 9-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E aste Collection Infrastructure IBRD / 90240 Post Limited - National 42,400.00 0.00 Completed 2023-04-20 2023-04-26 2023-05-13 2023-05-09 2023-07-02 2023-06-15 Selected Cities tions nvelope (Pick Up Mini Dump Truck) TP ST RDF Jayakerta, Karawang Regency ID-BPPW JAWA BARAT-42562 0-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E aste Residue Transportation I IBRD / 90240 Post Limited - National 86,200.00 0.00 Completed 2023-04-20 2023-04-17 2023-05-06 2023-05-10 2023-06-20 2023-06-22 Selected Cities tions nvelope nfrastructure (Arm Roll Truck and Container) TPST RDF Jay akerta, Karawang Regency ID-BPPW JAWA BARAT-42561 5-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E aste Collection Infrastructure IBRD / 90240 Post Limited - National 49,100.00 0.00 Completed 2023-04-10 2023-04-07 2023-04-22 2023-05-04 2023-06-21 2023-05-26 Selected Cities tions nvelope (Trash Motorbikes) at RDF Te galsari TPST, Purwakarta Reg ency ID-BPPW JAWA BARAT-42546 8-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E aste Collection Infrastructure IBRD / 90240 Post Limited - National 42,400.00 0.00 Completed 2023-04-20 2023-04-17 2023-05-02 2023-05-09 2023-06-16 Selected Cities tions nvelope (Pick Up Mini Dump Truck) TP ST RDF Tegalsari, Purwakarta Regency ID-BPPW JAWA BARAT-42561 9-GO-DIR / Procurement of W Solid Waste Infrastructure in Request for Quota Single Stage - One E aste Residue Transport Infras IBRD / 90240 Post Limited - National 43,100.00 0.00 Completed 2023-04-20 2023-04-17 2023-05-02 2023-05-10 2023-06-16 2023-06-22 Selected Cities tions nvelope tructure (Arm Roll Trucks and Containers) TPST RDF Tegals ari, Purwakarta Regency ID-BPPW JAWA BARAT-43854 0-GO-RFQ / Procurement of Solid Waste Infrastructure in Request for Quota Single Stage - One E IBRD / 90240 Post Limited - National 19,000.00 0.00 Completed 2024-08-10 2024-08-16 2024-09-28 2024-11-27 Waste Collection Facilities (Tr Selected Cities tions nvelope ash Motorbikes) for Bekasi R egency TPST Page 2 ID-BPPW JAWA BARAT-43855 0-GO-RFQ / Procurement of G Solid Waste Infrastructure in Request for Quota Single Stage - One E IBRD / 90240 Post Limited - National 46,000.00 0.00 Completed 2024-08-10 2024-08-16 2024-09-28 2024-11-27 2024-09-24 arbage Collection Facilities (P Selected Cities tions nvelope ick Ip Mini Dump) TPST Bekas i Regency ID-BPPW JAWA BARAT-43855 3-GO-RFQ / Procurement of Solid Waste Infrastructure in Request for Quota Single Stage - One E IBRD / 90240 Post Limited - National 180,000.00 0.00 Signed 2024-08-23 2024-08-23 2024-10-11 2024-09-03 2024-12-10 Waste Collection Facilities (A Selected Cities tions nvelope rm Roll Truck and Container) TPST Bekasi Regency NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ID-BPPW JAWA BARAT-43237 Integrated Planning Support 3-NC-RFB / The Operationaliz and Capacity Building for Lo Single Stage - One E Under Imple IBRD / 90240 Post Request for Bids Open - National 464,260.00 0.00 2024-06-20 2024-06-14 2024-06-24 2024-06-24 2024-06-24 2024-07-23 2025-05-23 ation assistance of TPST (Se cal Government and Commu nvelope mentation ntiong TPST, Lebak Saat TPS nities T) at Cimahi City ID-BPPW JAWA BARAT-43590 Integrated Planning Support Single Stage - One E 4-NC-RFB / Operational assist IBRD / 90240 and Capacity Building for Lo Post Request for Bids Open - National 427,000.00 0.00 Signed 2024-07-02 2024-07-16 2024-07-07 2024-08-18 2024-07-24 2024-09-17 2024-08-12 2024-10-22 2025-08-18 nvelope ance for TPST Bekasi District cal Government and Commu nities ID-BPPW JAWA BARAT-45217 Integrated Planning Support 1-NC-RFB / The Operationaliz and Capacity Building for Lo Single Stage - One E Pending Impl ation assistance of TPST Stag IBRD / 90240 Post Request for Bids Open - National 518,594.00 0.00 2024-09-23 2024-09-28 2024-11-09 2024-12-09 2025-01-13 2025-09-10 cal Government and Commu nvelope ementation e II at Bandung City (Tegaleg nities a, Nyengseret, Holis 2) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ID-BPPW JAWA BARAT-38513 8-CS-CQS / TECHNICAL ASSIS Integrated Planning Support TANCE FOR THE PREPARATIO and Capacity Building for Lo Consultant Qualifi N OF A WASTE MANAGEMENT IBRD / 90240 Post Open - National 148,500.00 0.00 Signed 2023-04-05 2023-04-03 2023-04-26 2023-06-09 2023-05-16 2023-07-09 2023-06-09 2023-08-13 2023-06-19 2024-04-09 cal Government and Commu cation Selection SYSTEM MASTER PLAN IN IND nities RAMAYU DISTRICT, PURWAKA RTA DISTRICT AND CIANJUR DISTRICT ID-BPPW JAWA BARAT-38513 5-CS-CQS / TECHNICAL ASSIS Integrated Planning Support TANCE FOR PREPARATION OF and Capacity Building for Lo Consultant Qualifi WASTE MANAGEMENT SYSTE IBRD / 90240 Post Open - National 203,000.00 0.00 Signed 2023-04-05 2023-04-03 2023-04-26 2023-06-09 2023-05-16 2023-07-09 2023-06-09 2023-08-13 2023-06-19 2024-04-09 cal Government and Commu cation Selection M MASTER PLAN IN BANDUN nities G CITY, BANDUNG REGENCY, WEST BANDUNG REGENCY, C IMAHI CITY ID-BPPW JAWA BARAT-38513 2-CS-CQS / TECHNICAL ASSIS Integrated Planning Support TANCE FOR THE PREPARATIO and Capacity Building for Lo Consultant Qualifi IBRD / 90240 Post Open - National 163,000.00 0.00 Signed 2023-04-05 2023-04-03 2023-04-26 2023-06-09 2023-06-09 2023-07-09 2023-06-09 2023-08-13 2023-06-19 2024-04-09 N OF WASTE MANAGEMENT S cal Government and Commu cation Selection YSTEM MASTER PLANS IN BE nities KASI REGENCY, DEPOK CITY, AND KARAWANG REGENCY ID-BPPW JAWA BARAT-38514 2-CS-CQS / Implementation o f Strengthening the Active Ro Integrated Planning Support le of the Community in the W and Capacity Building for Lo Consultant Qualifi IBRD / 90240 Post Open - National 369,000.00 0.00 Signed 2023-09-05 2023-09-12 2023-09-26 2023-11-09 2023-10-24 2023-12-09 2023-12-06 2024-01-13 2023-12-13 2025-07-13 aste Management System in cal Government and Commu cation Selection West Java Region 2 (Bandung nities City, Bandung Regency, Cim ahi City, West Bandung Rege ncy, Indramayu Regency) ID-BPPW JAWA BARAT-38514 0-CS-CQS / Implementation o f Strengthening the Commun Integrated Planning Support ity's Active Role in the Waste and Capacity Building for Lo Consultant Qualifi IBRD / 90240 Post Open - National 367,000.00 0.00 Signed 2023-09-05 2023-09-12 2023-09-26 2023-11-09 2023-10-24 2023-12-09 2023-12-11 2024-01-13 2023-12-13 2025-07-13 Management System in West cal Government and Commu cation Selection Java Region 1 (Purwakarta Re nities gency, Karawang Regency, B ekasi Regency, Cianjur Rege ncy and Depok City) ID-BPPW JAWA BARAT-38575 3-CS-CQS / Integrated Constr Solid Waste Infrastructure in Consultant Qualifi IBRD / 90240 Post Open - National 114,650.00 0.00 Signed 2023-10-12 2023-10-31 2023-10-26 2023-11-16 2023-12-01 2023-11-23 2023-12-15 2023-12-07 2024-10-02 uction Management Design a Selected Cities cation Selection nd Construction of TPST Dep ok City ID-BPPW JAWA BARAT-38763 7-CS-CQS / INTEGRATED CON Solid Waste Infrastructure in Consultant Qualifi Under Implement STRUCTION MANAGEMENT C IBRD / 90240 Post Open - National 224,000.00 0.00 2023-10-16 2023-10-23 2023-10-30 2023-11-20 2023-11-27 2023-12-03 2025-09-23 Selected Cities cation Selection ation ONSULTANT DESIGN AND CO NSTRUCTION OF TPST INDRA MAYU DISTRICT ID-BPPW JAWA BARAT-39373 8-CS-CQS / INTEGRATED CON Solid Waste Infrastructure in Consultant Qualifi Under Implement STRUCTION MANAGEMENT C IBRD / 90240 Post Open - National 224,000.00 0.00 2023-11-22 2023-04-13 2023-12-06 2023-12-27 2024-01-03 2024-01-13 2025-11-03 Selected Cities cation Selection ation ONSULTANT DESIGN AND CO NSTRUCTION OF TPST BAND UNG CITY ID-BPPW JAWA BARAT-56789 Integrated Planning Support -CS-CQS / Supervision for Co and Capacity Building for Lo Consultant Qualifi Pending Impleme nstruction of Solid Waste Tre IBRD / 90240 Post Open - National 34,483.00 0.00 2021-06-03 2021-06-17 2021-07-19 2021-11-05 2021-11-30 2022-05-29 cal Government and Commu cation Selection ntation atment Facility (TPST) Refuse nities Derived Fuel (RDF) at Bandu ng City INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3