PROCUREMENT PLAN Agricultural Employment Support for Refugees Project information: and Turkish Citizens Through Enhanced Market Linkages (P171543) Project Implementation Agricultural Credit Cooperatives Central Union Agency: Date of the Procurement 30 March 2020 Plan: Period covered by this 04 March 2020 - 31 March 2024 Procurement Plan: Date of General 28 April 2020 Procurement Notice: I. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 and revised August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. Any procurement activity under the Project shall not be initiated before it is approved by the Bank through STEP. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. II. Goods, Works and Non-Consulting Services Procurement Method Procurement Method Threshold RFB/Open Default Method (No procurement method threshold) International Goods and Non-consulting Services RFB/Open National Contracts less than US$5,000,000 Goods, Non-Consulting Services RFQ Contracts less than US$1,000,000 Direct Selection No threshold III. Selection of Consultants Selection Method Selection Method Threshold Quality and Cost Based No selection method threshold Selection (QCBS) Least Cost Selection No selection method threshold (LCS) Quality Based Selection No selection method threshold (QBS) 1/2 Selection Based on Consultants Contracts valued less than $2,000,000 Qualification (CQS) Individual Consultants No selection method threshold (IC) Direct Selection No selection method threshold The terms of references of any audit, procurement or legal consultants financed by the project shall be sent to the Bank for its comments. IV. Special Arrangements 1. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. For the procurements not subject to international competitive selection the procurement documents agreed by the Bank shall be used. 2. Review Procedure: All the procurements under the project are subject to the Bank’s ex-post review unless otherwise specified in the procurement schedule given below in Section V. 3. Procurement of Second-Hand Goods: Not Applicable. 4. Domestic preference (as specified under paragraph 5.51 of the Procurement Regulations): Not applicable. 5. Operational costs. will not be considered under procurement implementation which could be the incremental expenses, including office supplies, vehicles operation and maintenance cost, maintenance of equipment, communication costs, rental expenses, utilities expenses, consumables, transport and accommodation, per diem, cost for procurement advertisements, and salaries of locally contracted support staff. V. Procurement Packages with Methods and Time Schedule The estimated costs in the attached tables (sheets) (excluding VAT). 2/2 PROCUREMENT Turkiye : Agricultural Employment Support for Refugees and Turkish Citizens through Enhanced Market Linkages PLAN General Information Country: Turkiye Bank’s Approval Date of the Original Procurement Plan: 2020-04-30 Revised Plan Date(s): (comma delineated, leave blank if 2024-09-26 none) Project ID: P171543 GPN Date: 2020-04-28 Project Name: Agricultural Employment Support for Refugees and Turkish Citizens through Enhanced Market Linkages Loan / Credit No: TF / B4378, / Agricultural Credit Cooperatives Central Union Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual G3.1-01 / Purchase of Office Implementation support and Request for Quota Single Stage - One E / Post Open - National 0.00 Canceled 2020-05-17 2020-06-03 2020-06-10 Equipment for PIU institutional capacity buildin tions nvelope g G3.1-02 / Purchase of Printer Implementation support and Request for Quota Single Stage - One E /s, Laptop/s and Other Equip / institutional capacity buildin Post Open - National 0.00 Canceled 2020-05-17 2020-06-19 2020-06-24 tions nvelope ment for PIU Staff and Centra g l ACC Staff G3.1-03 / Purchase of an Acc Implementation support and Request for Quota Single Stage - One E / Post Open - National 0.00 Canceled 2020-05-10 2020-05-27 2020-06-03 ounting Software for PIU institutional capacity buildin tions nvelope g G3.3-01 / Purchase of Deskt Implementation support and ops, Printers, 4,5 G Modems Request for Quota Single Stage - One E TF / B4378 institutional capacity buildin Post Open - National 0.00 Canceled 2020-05-14 2021-03-25 2020-06-03 2020-08-02 & Notebooks for Primary ACC tions nvelope g s and Laptops for Regional U nions G3.3-02 / Purchase of Server Implementation support and Request for Quota Single Stage - One E TF / B4378 Post Open - National 0.00 Canceled 2020-05-13 2021-01-24 2020-06-07 2020-12-04 s and Network Infrastructure institutional capacity buildin tions nvelope g G3.1- 03 / Purchase of an Ac Implementation support and Request for Quota Single Stage - One E TF / B4378 Post Limited 22,196.35 Completed 2021-01-16 2021-02-04 2021-03-13 2021-03-04 2022-12-31 2021-08-31 counting Software for PIU institutional capacity buildin tions nvelope g G3.1- 02A / Purchase of Print Implementation support and Request for Quota Single Stage - One E er/s, Laptop/s for PIU Staff an TF / B4378 institutional capacity buildin Post Limited 45,595.70 Completed 2021-01-25 2021-03-09 2021-03-22 2021-03-26 2022-12-31 2021-04-16 tions nvelope d Central ACC Staff g G3.1- 01 / Procurement of of Implementation support and Request for Quota Single Stage - One E TF / B4378 Post Limited 71,884.14 Completed 2021-02-15 2021-04-02 2021-04-12 2021-04-21 2021-05-12 2021-04-21 fice equipment for PIU institutional capacity buildin tions nvelope g G3.2-01A / Production of Mat Implementation support and Request for Quota Single Stage - One E erials for Visibility and Outre TF / B4378 institutional capacity buildin Post Limited 32,812.47 Completed 2021-02-14 2021-02-11 2021-02-19 2021-02-20 2021-03-21 2021-02-24 tions nvelope ach Package (Mersin) g G3.2-01B / Material Producti Implementation support and on for Visibility and Meeting Request for Quota Single Stage - One E TF / B4378 institutional capacity buildin Post Limited 41,601.02 Completed 2022-06-04 2022-02-28 2022-06-21 2022-03-13 2022-07-06 2022-03-18 Organizations ( Adana, Mersi tions nvelope g n, Gaziantep , Bursa,Adıyama n) G3.2-01C / Production of ma Implementation support and Request for Quota Single Stage - One E TF / B4378 Post Limited 8,993.19 Completed 2022-06-29 2022-06-27 2022-08-02 2022-07-08 2022-08-17 2022-07-12 terials for visibility institutional capacity buildin tions nvelope g G3.2-01D / Material Producti Implementation support and on for Visibility and Meeting Request for Quota Single Stage - One E TF / B4378 institutional capacity buildin Post Limited 0.00 Completed 2022-10-14 2022-10-14 2022-10-31 2022-11-01 2022-12-15 2023-02-01 Organizations ( Adana, Mersi tions nvelope g n, Gaziantep , Bursa,Adıyama n) G3.1-02B / Purchase of other Implementation support and Request for Quota Single Stage - One E TF / B4378 Post Limited 0.00 Completed 2022-11-14 2023-01-16 2022-12-26 2023-02-25 2022-12-30 2023-03-18 Equipment for PIU Staff institutional capacity buildin tions nvelope g G3.3-01B / Purchase of Desk Implementation support and tops, Printers, 4,5 G Modems Request for Quota Single Stage - One E TF / B4378 institutional capacity buildin Post Open - National 0.00 Completed 2023-01-20 2023-03-10 2023-03-24 2023-06-08 2023-08-07 & Notebooks for Primary ACC tions nvelope g s and Laptops for Regional U nions G3.3-02B / Purchase of Serv Implementation support and Request for Quota Single Stage - One E TF / B4378 Post Open - National 0.00 Completed 2023-01-25 2023-02-23 2023-04-11 2023-08-02 2023-07-25 ers and Network Infrastructur institutional capacity buildin tions nvelope e g G3.2-01E / Production of mat Implementation support and Request for Quota Single Stage - One E TF / B4378 Post Limited 0.00 Canceled 2023-08-08 2023-08-08 2023-08-28 2023-10-12 erials for visibility institutional capacity buildin tions nvelope g NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NCS3.2-01 / Logistical and O Implementation support and Request for Quota Single Stage - One E rganizational Services for Pro / institutional capacity buildin Post Open - National 0.00 Canceled 2020-05-14 2020-06-01 2020-06-15 tions nvelope ject Kick-off Meeting & Cere g mony NCS3.2-09 / Production of Bo Implementation support and Request for Quota Single Stage - One E oklets: Farmers and workers / institutional capacity buildin Post Open - National 0.00 Canceled 2023-10-18 2023-12-13 2024-01-12 tions nvelope tell their stories g NCS3.2-02 / Logistical and O Implementation support and Request for Quota Single Stage - One E / Post Open - National 0.00 Canceled 2023-11-18 2023-12-19 2023-12-25 rganizational Services for Clo institutional capacity buildin tions nvelope sing Event g NCS3.2- 01 / Opening cerem Implementation support and Request for Quota Single Stage - One E TF / B4378 Post Limited 60,374.77 Completed 2021-02-10 2021-06-02 2021-02-24 2021-07-06 2021-03-05 2022-07-06 ony of the project institutional capacity buildin tions nvelope g Page 1 NCS3.2- 09 / Production of B Implementation support and Request for Quota Single Stage - One E Pending Impl ooklets: Farmers and workers TF / B4378 institutional capacity buildin Post Limited 0.00 2022-04-06 2022-06-01 2022-07-01 tions nvelope ementation tell their stories g NCS3.2-04A / Logistical and Implementation support and Request for Quota Single Stage - One E Organizational Services for In TF / B4378 institutional capacity buildin Post Limited 24,337.08 Completed 2021-02-14 2021-02-11 2021-04-11 2021-02-20 2021-10-08 2021-03-14 tions nvelope formative Meetings (Mersin) g NCS1.2-01A / Organisations Enhancing employment opp Request for Quota Single Stage - One E for the Sensitization Sessions TF / B4378 ortunities through contract f Post Limited 28,169.03 Completed 2022-06-04 2022-02-08 2022-06-21 2022-02-16 2022-07-06 2022-02-23 tions nvelope for Farmers in İzmir arming NCS3.2-04B / Organization o Implementation support and Request for Quota Single Stage - One E f the Informative Meeting for TF / B4378 institutional capacity buildin Post Limited 27,830.99 Completed 2022-06-01 2022-02-08 2022-06-17 2022-02-16 2022-07-02 2022-02-28 tions nvelope Cooperatives in İzmir g NCS3.2-04C / Organization o Implementation support and f the Informative Meeting for Request for Quota Single Stage - One E TF / B4378 institutional capacity buildin Post Limited 78,722.56 Completed 2022-06-04 2022-02-22 2022-06-20 2022-03-06 2022-07-05 2022-03-29 Cooperatives in Adana, Mersi tions nvelope g n, Bursa, Gaziantep and Adıy aman NCS.1.2-01B / Organisations Enhancing employment opp for the Sensitization Sessions Request for Quota Single Stage - One E TF / B4378 ortunities through contract f Post Limited 102,360.72 Completed 2022-06-02 2022-02-22 2022-06-17 2022-03-05 2022-07-02 2022-03-27 for Farmers in Adana, Mersin, tions nvelope arming Gaziantep, Bursa and Adıyam an NCS3.2-03A / Awareness Rai Implementation support and Request for Quota Single Stage - One E sing Events -Harvest Days Or TF / B4378 institutional capacity buildin Post Limited 0.00 Completed 2022-10-08 2022-10-14 2022-10-22 2022-10-31 2022-10-30 2022-11-13 tions nvelope ganization Service Procurem g ent NCS3.2-10 / Procurement of Implementation support and Request for Quota Single Stage - One E TF / B4378 Post Limited 0.00 Signed 2022-11-16 2023-01-04 2022-12-17 2023-02-03 2024-12-31 the Services for Grievance M institutional capacity buildin tions nvelope echanism g NCS3.2-08A / Purchase of pr Implementation support and Request for Quota Single Stage - One E eparation of one-minute vide TF / B4378 institutional capacity buildin Post Limited 0.00 Completed 2023-08-07 2023-08-07 2023-09-20 2023-09-25 2023-12-19 2024-02-07 tions nvelope o materials and project benef g iciary stories NCS3.1-01A / Procurement o Implementation support and f Logistics and Organization Request for Quota Single Stage - One E TF / B4378 institutional capacity buildin Post Limited 0.00 Completed 2023-09-15 2023-11-23 2023-11-10 2023-12-19 2023-12-25 2024-03-15 Services for Study Tours relat tions nvelope g ed to Project Management an d Contract Farming NCS3.2-03B / Awareness Rai Implementation support and Request for Quota Single Stage - One E sing Events -Harvest Days Or TF / B4378 institutional capacity buildin Post Limited 0.00 Completed 2023-09-23 2023-09-20 2023-10-12 2023-10-05 2023-10-30 2023-11-01 tions nvelope ganization(izmir) Service Pro g curement NCS3.1-01B / Procurement o Implementation support and f Logistics and Organization Request for Quota Single Stage - One E TF / B4378 institutional capacity buildin Post Limited 0.00 Completed 2024-01-21 2024-01-23 2024-02-21 2024-02-08 2024-04-06 2024-06-03 Services for Study Tours 2 rel tions nvelope g ated to Project Management and Contract Farming NCS3.2-05A / Logistical and Implementation support and Request for Quota Single Stage - One E Organizational Services for A TF / B4378 institutional capacity buildin Post Limited 0.00 Completed 2024-01-23 2024-01-24 2024-02-23 2024-02-02 2024-03-24 2024-02-21 tions nvelope nnual Meetings g NCS3.1-01C / Logistical and Implementation support and Request for Quota Single Stage - One E Organizational Services for A TF / B4378 institutional capacity buildin Post Limited - National 0.00 Completed 2024-04-19 2024-05-15 2024-05-16 2024-06-13 2024-07-15 2024-08-16 tions nvelope CC Capacity Building Training g s-1 NCS3.2-03C / Awareness Rai Implementation support and Request for Quota Single Stage - One E sing Events -Harvest Days Or TF / B4378 institutional capacity buildin Post Limited - National 0.00 Completed 2024-06-11 2024-06-12 2024-07-07 2024-07-08 2024-07-25 2024-07-25 tions nvelope ganization(BURSA) Service Pr g ocurement NCS3.1-01D / Logistical and Implementation support and Organizational Services for A Request for Quota Single Stage - One E Pending Impl TF / B4378 institutional capacity buildin Post Limited - National 0.00 2024-09-11 2024-10-01 2024-11-30 CC Capacity Building Training tions nvelope ementation g s-II(sales marketing-HR) NCS3.1-01E / Logistical and Organizational Services for A Implementation support and Request for Quota Single Stage - One E Pending Impl CC Capacity Building Training TF / B4378 institutional capacity buildin Post Limited - National 0.00 2024-09-12 2024-10-05 2024-12-04 tions nvelope ementation s-1(sustainable agriculture-a g gricultural cooperatives) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS1.1-02 / Recruitment of a Enhancing employment opp Consultant Qualifi Consulting Firm to carry out TF / B4378 ortunities through contract f Post Open - National 300,144.60 Completed 2020-04-29 2020-07-08 2020-05-02 2020-07-23 2020-05-20 2020-12-03 2020-06-03 2021-01-19 2020-06-09 2021-03-19 2020-10-23 2021-09-06 cation Selection a Needs Assessment Study arming CS1.2-01 / Provision of Tech Enhancing employment opp nical Assistance (TA) for Emp Consultant Qualifi TF / B4378 ortunities through contract f Post Open - National 227,921.84 Signed 2020-04-29 2020-09-23 2020-05-04 2020-09-30 2020-05-23 2020-11-30 2020-06-06 2021-01-20 2020-06-16 2021-04-07 2023-12-29 loyers entering to the Contra cation Selection arming ct Farming aspect of formaliz ation process CS1.2-02 / Recruitment of a consulting firm to carry out Fi Enhancing employment opp Consultant Qualifi eld Visits for on-site complian TF / B4378 ortunities through contract f Post Open - National 837,458.55 Signed 2020-05-17 2022-02-16 2020-05-22 2020-06-10 2022-04-22 2020-06-15 2022-06-01 2020-07-06 2022-06-24 2023-09-29 cation Selection ce of the beneficiaries/farmer arming s, Food Safety and GRM CS2-01 / Recruitment of a C Increasing demand for contr Consultant Qualifi onsultant Firm to carry out V / Post Open - National 0.00 Completed 2020-05-04 2022-07-18 2020-05-11 2020-06-02 2022-10-10 2020-06-17 2023-02-24 2020-07-04 2023-04-10 2021-01-30 2024-02-12 act farming cation Selection alue Chain analyses CS2-03 / Recruitment of a C Increasing demand for contr Consultant Qualifi onsulting Firm for provision o TF / B4378 Post Open - National 170,199.34 Completed 2020-05-04 2021-04-28 2020-05-11 2021-05-24 2020-06-02 2021-12-13 2020-06-17 2022-01-04 2020-07-04 2022-01-20 2021-01-30 act farming cation Selection f Project Preparation Training s CS3.1-17 / Recruitment of a Consulting Firm for provision Implementation support and Consultant Qualifi Pending Impleme of Technical Assistance in Val / institutional capacity buildin Post Open - National 0.00 2020-05-22 2020-06-05 2020-06-26 2020-07-11 2020-08-08 2021-04-05 cation Selection ntation ue Chain and Market Analysis g for Increasing Capacity of Co ntract Farming Page 2 CS3.1-18 / Recruitment of a Consulting Firm to carry out Implementation support and Studies for Improving the Fu Consultant Qualifi Pending Impleme / institutional capacity buildin Post Open - National 0.00 2020-06-08 2020-06-15 2020-07-06 2020-07-20 2020-08-10 2021-02-06 nctionality of ACC in the field cation Selection ntation g s of Market Researches, Sect or Analysis, Possible Restruct uring Studies and etc. CS3.2-01 / Recruitment of a Consulting Firm to support th Implementation support and Consultant Qualifi e Grievance and Redress Me TF / B4378 institutional capacity buildin Post Open - National 0.00 Canceled 2020-05-29 2021-05-24 2020-06-03 2021-06-14 2020-06-11 2020-06-26 2020-07-18 2022-07-08 cation Selection chanism and make it functio g ning for project beneficiaries, refugees and workers CS3.2-02 / Recruitment of a Implementation support and Consulting Firm for Project’s Consultant Qualifi TF / B4378 institutional capacity buildin Post Open - National 151,101.00 Completed 2020-05-11 2020-07-10 2020-05-18 2020-07-23 2020-06-08 2020-12-01 2020-06-22 2021-01-20 2020-07-06 2021-03-01 2024-05-31 2023-01-26 Online Presence (Social Medi cation Selection g a management and Web Ser vices) CS3.2-03 / Recruitment of a Implementation support and Consultant Qualifi Pending Impleme Consulting firm for Awarenes / institutional capacity buildin Post Open - National 0.00 2020-05-15 2020-05-22 2020-06-12 2020-06-13 2020-06-27 2023-09-29 cation Selection ntation s Raising Campaign for Contr g act Farming CS3.3-03 / Recruitment of a Implementation support and consulting firm for Software Consultant Qualifi TF / B4378 institutional capacity buildin Post Open - National 842,754.50 Signed 2020-05-04 2020-08-11 2020-05-09 2021-01-24 2020-05-28 2021-03-11 2020-06-11 2021-08-11 2020-06-21 2021-08-18 2023-12-29 Development, Cyber Security cation Selection g & Warranty And Maintenance CS3.3-04 / Recruitment of a Implementation support and Consultant Qualifi consulting firm for Annual Fi TF / B4378 institutional capacity buildin Post Open - National 194,237.34 Completed 2020-05-15 2021-12-15 2020-05-20 2020-06-08 2022-01-31 2020-06-22 2022-02-14 2020-07-04 2022-03-05 2024-02-16 2024-05-21 cation Selection nancial Audits g C.S1.1-03A / Provision of Ser Enhancing employment opp vices for the Development of Consultant Qualifi TF / B4378 ortunities through contract f Post Open - National 1,593,891.26 Completed 2022-06-01 2022-01-30 2022-06-08 2022-06-25 2022-03-17 2022-07-02 2022-04-18 2022-07-08 2022-05-03 2022-10-21 2023-12-04 Technical Training Programs cation Selection arming for agricultural worker CS1.1-03B / Provision of Ser Enhancing employment opp vices for the Development of Consultant Qualifi TF / B4378 ortunities through contract f Post Open - National 211,861.04 Completed 2022-06-07 2022-01-30 2022-06-14 2022-07-12 2022-03-17 2022-07-19 2022-04-18 2022-07-29 2022-05-03 2022-10-12 2023-12-04 Soft Skills Training Program f cation Selection arming or Agricultural Workers CS1.1-03C / Provision of the Enhancing employment opp Consultant Qualifi Language Training Module D TF / B4378 ortunities through contract f Post Open - National 105,582.15 Completed 2022-06-07 2022-01-30 2022-06-21 2022-07-20 2022-03-17 2022-07-27 2022-05-23 2022-08-10 2022-06-07 2022-10-24 2023-12-04 cation Selection evelopment for Refugee Agri arming cultural Workers CS2-02 / Recruitment of a C onsulting Firm for External T echnical Evaluation to analy Increasing demand for contr Consultant Qualifi TF / B4378 Post Open - National 0.00 Signed 2023-01-20 2023-01-11 2023-01-27 2023-02-26 2023-05-23 2023-02-27 2023-07-31 2023-04-03 2023-08-06 2023-09-30 ze the technical and financial act farming cation Selection feasibility of the proposed mi cro/small grants as submitte d by the primary ACCs CS3.2-02B / Recruitment of Implementation support and a Consulting Firm for Project’ Consultant Qualifi TF / B4378 institutional capacity buildin Post Open - National 0.00 Signed 2023-03-07 2023-04-05 2023-03-14 2023-04-04 2023-10-10 2023-04-18 2023-11-20 2023-05-01 2023-12-01 2024-10-30 s Online Presence (Social Me cation Selection g dia management and Web Se rvices) CS1.1-04E / RECRUITMENT O Enhancing employment opp F CONSULTING FIRM FOR OR Consultant Qualifi TF / B4378 ortunities through contract f Post Open - National 0.00 Canceled 2022-10-17 2022-10-20 2022-11-10 2022-11-13 2022-11-19 2024-05-20 GANIZATION AND DELIVERY cation Selection arming OF LANGUAGE TRAININGS CS1.1-04F / RECRUITMENT O Enhancing employment opp F CONSULTING FIRM FOR OR Consultant Qualifi TF / B4378 ortunities through contract f Post Open - National 0.00 Canceled 2022-10-18 2022-10-21 2022-11-11 2022-11-14 2022-11-24 2024-05-17 GANIZATION AND DELIVERY cation Selection arming OF SOFT SKILLS TRAININGS CS3.3-01 / Recruitment of a Implementation support and Consultant Qualifi TF / B4378 Post Open - National 0.00 Signed 2024-01-08 2024-01-26 2024-01-15 2024-02-12 2024-05-03 2024-02-26 2024-06-14 2024-03-11 2024-06-26 2024-08-08 consultant firm for Process E institutional capacity buildin cation Selection valuations g CS3.3-02 / Recruitment of a Implementation support and Consultant Qualifi Under Implement consulting firm for a baselin TF / B4378 institutional capacity buildin Post Open - National 0.00 2024-04-22 2024-05-15 2024-05-02 2024-05-19 2024-05-26 2024-06-01 2024-12-28 cation Selection ation e and endline survey (Impact g Evaluatin) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS1.1-01 / Recruitment of a Enhancing employment opp n NGO to carry out Outreach TF / B4378 ortunities through contract f Post Direct Selection Direct 1,253,426.75 Completed 2020-04-28 2020-04-28 2020-05-04 2020-05-29 2020-06-09 2021-02-26 2023-09-29 Activities, Pre-Employment Pr arming ofiling & Referral Activities CS3.1-02 / Recruitment of co Implementation support and Individual Consult nsultant for ACC PIU as Proc TF / B4378 institutional capacity buildin Post Open 36,381.00 Signed 2020-04-29 2020-04-29 2020-05-18 2020-11-30 2020-05-20 2020-12-14 2020-06-06 2020-12-18 2023-12-29 ant Selection urement Specialist g CS3.1-03 / Recruitment of a Implementation support and Individual Consult TF / B4378 Post Open 34,100.16 Signed 2020-04-29 2020-09-04 2020-05-18 2020-12-02 2020-05-20 2020-12-04 2020-05-27 2020-12-31 2023-12-29 consultant for ACC PIU as M& institutional capacity buildin ant Selection E specialist g CS3.1-04 / Recruitment of a Implementation support and Individual Consult consultant for ACC PIU as Fin TF / B4378 institutional capacity buildin Post Open 36,373.50 Signed 2020-04-29 2020-04-29 2020-05-18 2020-06-29 2020-05-20 2020-12-14 2020-05-27 2020-12-31 2023-12-20 ant Selection ancial Management Specialis g t CS3.1-06 / Recruitment of a Implementation support and Individual Consult consultant for ACC PIU as a C TF / B4378 institutional capacity buildin Post Open 35,548.16 Signed 2020-04-29 2020-08-11 2020-05-18 2020-12-10 2020-05-20 2020-12-14 2020-05-27 2020-12-29 2023-12-29 ant Selection ommunications Specialist g CS3.1-09 / Recruitment of co Implementation support and Individual Consult nsultant/s for ACC PIU as Fiel TF / B4378 institutional capacity buildin Post Open 34,100.16 Signed 2020-04-29 2020-09-04 2020-05-18 2020-12-04 2020-05-20 2020-12-04 2020-05-27 2020-12-29 2023-12-29 ant Selection d Coordinator g CS3.1-10 / Recruitment of co Implementation support and Individual Consult nsultant/s for Izmir Regional TF / B4378 institutional capacity buildin Post Open 15,352.91 Signed 2020-05-11 2020-09-04 2020-05-30 2021-03-25 2020-06-01 2021-03-25 2020-06-08 2021-04-14 2023-12-29 ant Selection Union as Field Officer g CS3.1-11 / Recruitment of co Implementation support and Individual Consult nsultant/s for Bursa Regional TF / B4378 institutional capacity buildin Post Open 14,449.80 Terminated 2020-05-11 2020-09-04 2020-05-30 2021-03-25 2020-06-01 2021-03-25 2020-06-08 2021-04-12 2023-12-29 ant Selection Union as Field Officer g Page 3 CS3.1-12 / Recruitment of co Implementation support and Individual Consult nsultant/s for Mersin Regiona TF / B4378 institutional capacity buildin Post Open 15,352.91 Signed 2020-05-11 2020-09-04 2020-05-30 2021-03-15 2020-06-01 2021-03-25 2020-06-08 2021-04-12 2023-12-29 ant Selection l Union as Field Officer g CS3.1-13 / Recruitment of co Implementation support and Individual Consult nsultant/s for Adana Regional TF / B4378 institutional capacity buildin Post Open 15,321.04 Signed 2020-05-11 2020-09-04 2020-05-30 2021-03-15 2020-06-01 2021-03-26 2020-06-08 2021-04-12 2023-12-29 ant Selection Union as Field Officer g CS3.1-14 / Recruitment of co Implementation support and Individual Consult Under Implement nsultant/s for Gaziantep Regi TF / B4378 institutional capacity buildin Post Open 0.00 2020-05-11 2020-09-04 2020-05-30 2021-08-11 2020-06-01 2022-12-31 2020-06-08 2023-12-29 ant Selection ation onal Union as Field Officer g CS3.1-15 / Recruitment of co Implementation support and Individual Consult nsultant/s for Adiyaman Regi TF / B4378 institutional capacity buildin Post Open 16,256.03 Signed 2020-05-11 2020-09-04 2020-06-10 2021-03-15 2020-06-12 2021-03-15 2020-06-19 2021-04-10 2023-12-29 ant Selection onal Union as Field Officer g CS3.1-05 / Recruitment of a Implementation support and Individual Consult consultant for ACC PIU as Soc / institutional capacity buildin Post Open 0.00 Canceled 2020-04-29 2020-05-18 2020-05-20 2020-05-27 2023-12-29 ant Selection ial Safeguards Specialist g CS3.1-01 / Recruitment of a Implementation support and Individual Consult consultant for ACC PIU as Pro / institutional capacity buildin Post Open 0.00 Canceled 2020-04-29 2020-05-18 2020-05-20 2020-05-27 2023-12-29 ant Selection ject Coordinator g CS3.1-20 / Recruitment of a Implementation support and Individual Consult consultant for ACC PIU as Pro TF / B4378 institutional capacity buildin Post Direct 47,338.20 Signed 2020-08-21 2020-09-02 2020-08-27 2020-11-03 2020-09-03 2020-11-25 2020-09-17 2020-12-13 2023-12-31 ant Selection ject Coordinator g CS3.1-07 / Recruitment of co Implementation support and Individual Consult / Post Open 0.00 Canceled 2020-04-29 2020-05-18 2020-05-20 2020-05-27 2023-06-30 nsultant for ACC PIU as IT Sp institutional capacity buildin ant Selection ecialists g CS3.1-21 / Recruitment of co Implementation support and Individual Consult TF / B4378 Post Direct 39,448.50 Signed 2020-08-21 2020-09-02 2020-08-31 2020-11-03 2020-09-21 2020-11-25 2020-10-26 2020-12-04 2023-06-30 nsultant for ACC PIU as IT Sp institutional capacity buildin ant Selection ecialist g CS3.1-22 / Recruitment of co Implementation support and Individual Consult nsultant for ACC PIU as Envir TF / B4378 institutional capacity buildin Post Direct 39,448.50 Signed 2020-08-21 2020-09-02 2020-08-31 2020-11-03 2020-09-21 2020-11-25 2020-10-26 2020-12-04 2023-12-31 ant Selection onment Specialist g CS3.1-08 / Recruitment of a Implementation support and Individual Consult consultant for ACC PIU as a P / institutional capacity buildin Post Open 0.00 Canceled 2020-04-29 2020-05-18 2020-05-20 2020-05-27 2023-12-29 ant Selection roject Assistant g CS3.1-23 / Recruitment of co Implementation support and Individual Consult nsultant for ACC PIU as Traini TF / B4378 institutional capacity buildin Post Open 26,739.00 Signed 2020-09-01 2020-09-02 2020-10-20 2021-03-03 2020-11-10 2021-03-17 2020-12-15 2021-04-12 2023-12-31 ant Selection ng Specialist g CS3.1-19 / Recruitment of a Implementation support and Individual Consult consultant for ACC PIU as Soc TF / B4378 institutional capacity buildin Post Direct 39,448.50 Signed 2020-08-12 2020-09-02 2020-08-26 2020-11-03 2020-09-09 2020-11-26 2020-10-14 2020-12-13 2023-12-31 ant Selection ial Safeguards Specialist g CS3.1-16 / Recruitment of a Implementation support and Individual Consult consultant for ACC PIU as Fin / institutional capacity buildin Post Open 0.00 Completed 2020-08-14 2022-06-22 2020-09-02 2022-12-28 2020-09-23 2023-01-05 2020-10-28 2023-02-10 2023-12-31 2024-03-08 ant Selection ancial Management Assistant g CS3.1-18A / Personel Data Pr Implementation support and Individual Consult TF / B4378 Post Open 12,723.38 Completed 2021-03-30 2021-03-31 2021-04-23 2021-05-25 2021-04-24 2021-05-25 2021-04-30 2021-06-07 2021-12-31 2023-01-14 otection Specialist institutional capacity buildin ant Selection g CS3.1-18B / Recruitment of Implementation support and Individual Consult TF / B4378 Post Open 0.00 Canceled 2021-05-12 2021-05-12 2021-06-25 2021-06-26 2021-07-01 2022-04-30 Short Term Counsel institutional capacity buildin ant Selection g CS3.1-18C / Social Security a Implementation support and Individual Consult TF / B4378 Post Open 0.00 Canceled 2021-08-17 2021-08-17 2021-09-22 2021-09-23 2021-09-28 2022-06-22 nd Payroll Specialist institutional capacity buildin ant Selection g CS3.1-12B / Recruitment of c Implementation support and Individual Consult onsultant/s for Mersin Regio TF / B4378 institutional capacity buildin Post Open 0.00 Terminated 2022-06-06 2022-06-09 2022-06-26 2022-10-05 2022-06-28 2022-10-14 2022-07-04 2022-11-04 2022-12-31 ant Selection nal Union as Field Officer g CS3.1-11B / Recruitment of c Implementation support and Individual Consult onsultant/s for Bursa Regiona TF / B4378 institutional capacity buildin Post Open 0.00 Signed 2022-06-06 2022-06-09 2022-06-26 2022-10-05 2022-06-28 2022-10-14 2022-07-04 2022-11-04 2022-12-31 ant Selection l Union as Field Officer g CS3.1-14B / Recruitment of c Implementation support and Individual Consult onsultant/s for Gaziantep Re TF / B4378 institutional capacity buildin Post Open 0.00 Signed 2022-06-06 2022-06-09 2022-06-26 2022-10-05 2022-06-28 2022-10-24 2022-07-04 2022-11-12 2022-12-31 ant Selection gional Union as Field Officer g CS3.1-10B / Recruitment of c Implementation support and Individual Consult onsultant/s for İzmir Regiona TF / B4378 institutional capacity buildin Post Open 0.00 Signed 2022-06-06 2022-06-09 2022-06-26 2022-10-05 2022-06-28 2022-10-14 2022-07-04 2022-11-04 2022-12-31 ant Selection l Union as Field Officer g CS3.1-13B / Recruitment of c Implementation support and Individual Consult onsultant/s for Adana Region TF / B4378 institutional capacity buildin Post Open 0.00 Signed 2022-06-06 2022-06-09 2022-06-26 2022-10-05 2022-06-28 2022-10-14 2022-07-04 2022-11-05 2022-12-31 ant Selection al Union as Field Officer g CS3.1-03B / Recruitment of Implementation support and Individual Consult a consultant for ACC PIU as M TF / B4378 institutional capacity buildin Post Open 0.00 Signed 2022-06-24 2022-06-23 2022-07-13 2022-10-05 2022-07-15 2022-10-05 2022-07-20 2022-11-16 2022-12-31 ant Selection &E specialist g CS3.1-23B / Recruitment of c Implementation support and Individual Consult onsultant for ACC PIU as Trai TF / B4378 institutional capacity buildin Post Open - National 0.00 Signed 2022-10-11 2022-10-14 2022-10-28 2023-01-02 2022-10-31 2022-12-29 2022-11-06 2023-01-26 2024-12-31 ant Selection ning Specialist g CS3.1-20B / Recruitment of Implementation support and Individual Consult a consultant for ACC PIU as P TF / B4378 institutional capacity buildin Post Direct - National 0.00 Signed 2022-10-24 2022-11-09 2022-11-01 2022-10-17 2022-11-04 2022-11-17 2022-11-21 2022-10-25 2024-11-23 ant Selection roject Management g CS3.1-22B / Recruitment of c Implementation support and Individual Consult onsultant for ACC PIU as Envi TF / B4378 institutional capacity buildin Post Open - National 0.00 Signed 2022-12-01 2022-11-08 2022-12-30 2023-04-07 2023-01-06 2023-04-07 2023-01-20 2023-05-09 2023-07-19 ant Selection ronment Specialist g CS3.1-11C / Recruitment of Implementation support and Individual Consult consultant/s for Bursa Region TF / B4378 institutional capacity buildin Post Open - National 0.00 Signed 2023-08-31 2023-10-03 2023-09-25 2023-12-04 2023-10-02 2023-12-04 2023-10-15 2023-12-15 2024-12-31 ant Selection al Union as Field Officer g CS3.1-14C / Recruitment of Implementation support and Individual Consult consultant for Gaziantep Reg TF / B4378 institutional capacity buildin Post Open - National 0.00 Signed 2023-08-31 2023-10-03 2023-09-25 2023-12-05 2023-10-02 2023-12-06 2023-10-15 2023-12-29 2024-12-31 ant Selection ional Union as Field Officer g Page 4 CS3.1-12C / Recruitment of Implementation support and Individual Consult consultant for Mersin Region TF / B4378 institutional capacity buildin Post Open - National 0.00 Signed 2023-09-24 2023-10-03 2023-10-21 2023-12-04 2023-10-23 2023-12-04 2023-11-01 2023-12-15 2024-12-31 ant Selection al Union as Field Officer g CS3.1-18D / Recruitment of Implementation support and Individual Consult TF / B4378 Post Open - National 0.00 Signed 2023-10-02 2023-10-06 2023-11-20 2023-11-07 2023-12-11 2024-01-05 2024-01-15 2024-01-15 2024-12-31 Short Term Counsel - Legal A institutional capacity buildin ant Selection dvisor g CS1.1-01B / Consulting Servi ces for the Matching Activity Enhancing employment opp Between Farmers and Refug TF / B4378 ortunities through contract f Post Direct Selection Direct - National 0.00 Signed 2023-10-06 2023-10-06 2023-10-12 2023-10-06 2023-11-17 2023-12-11 2024-09-30 ee Agricultural Workers, Com arming plementary Registration and Referral Services CS3.3-04B / Financial Audit f Implementation support and Pending Impleme or 2023 – 2024 and Complian TF / B4378 institutional capacity buildin Post Direct Selection Direct - National 0.00 2024-01-08 2024-01-16 2024-01-29 2024-07-27 ntation ce Audit for Component 1-2 g Page 5