BADAN PEMERIKSA KEUANGAN REPUBLIK INDONESIA LAPORAN HASIL PEMERIKSAAN ATAS LAPORAN KEUANGAN WORLD BANK GRANT TF0B5967 INDONESIAN ENVIRONMENT FUND TECHNICAL ASSISTANCE PROJECT TAHUN 2023 PADA BADAN PENGELOLA DANA LINGKUNGAN HIDUP AUDITORAT UTAMA KEUANGAN NEGARA II JAKARTA Nomor : 43.a /LHP/XV/06/2024 Tanggal : 28 JUNI 2024 DAFTAR ISI Halaman DAFTAR ISI ................................................................................................................. ii SISTEMATIKA LAPORAN HASIL PEMERIKSAAN ATAS LAPORAN KEUANGAN WORLD BANK GRANT TF0B5967 INDONESIAN ENVIRONMENT FUND TECHNICAL ASSISTANCE PROJECT TAHUN 2023..................................... iii LAPORAN HASIL PEMERIKSAAN ATAS LAPORAN KEUANGAN ................... 1 GAMBARAN UMUM PEMERIKSAAN..................................................................... 3 LAPORAN KEUANGAN INDONESIAN ENVIRONMENT FUND—TECHNICAL ASSISTANCE PROJECT TAHUN 2023 1. Interim Financial Report (IFR-1) 2. Designated Account Activity Statement (I-A) 3. Laporan Penerimaan dan Pengeluaran 4. Laporan Aktiva dan Kewajiban 5. Penjelasan atas Laporan Keuangan 6. Catatan atas Laporan Keuangan ii SISTEMATIKA LAPORAN HASIL PEMERIKSAAN ATAS LAPORAN KEUANGAN WORLD BANK GRANT TF0B5967 INDONESIAN ENVIRONMENT FUND TECHNICAL ASSISTANCE PROJECT TAHUN 2023 PADA BADAN PENGELOLA DANA LINGKUNGAN HIDUP DI JAKARTA Laporan Hasil Pemeriksaan (LHP) atas Indonesian Environment Fund Technical Assistance Project World Bank Grant No. TF0B5967 Tahun 2023 terdiri atas dua laporan pokok sebagai berikut. 1. Laporan I: Laporan Hasil Pemeriksaan atas Laporan Keuangan Laporan I memuat: a. Laporan hasil pemeriksaan atas laporan keuangan yang memuat opini BPK; b. Gambaran umum pemeriksaan yang berisi dasar hukum pemeriksaan, standar pemeriksaan, tujuan pemeriksaan, entitas yang diperiksa, lingkup pemeriksaan, metodologi pemeriksaan, jangka waktu pemeriksaan, dan batasan pemeriksaan; dan c. Laporan keuangan World Bank Grant TF0B5967 IEF TAP. 2. Laporan II: Laporan Hasil Pemeriksaan atas Sistem Pengendalian Intern dan Kepatuhan terhadap Ketentuan Peraturan Perundang-undangan Laporan II memuat: a. Resume Hasil Pemeriksaan atas Sistem Pengendalian Intern dan Kepatuhan terhadap Ketentuan Peraturan Perundang-undangan; b. Hasil Pemeriksaan atas Sistem Pengendalian Intern dan Kepatuhan terhadap Ketentuan Peraturan Perundang-undangan; dan c. Hasil Pemantauan Tindak Lanjut Pemeriksaan atas Sistem Pengendalian Intern dan Kepatuhan terhadap Ketentuan Peraturan Perundang-undangan. iii GAMBARAN UMUM PEMERIKSAAN 1. Dasar Hukum Pemeriksaan a. UU Nomor 15 Tahun 2004 tentang Pemeriksaan Pengelolaan dan Tanggung Jawab Keuangan Negara; b. UU Nomor 15 Tahun 2006 tentang Badan Pemeriksa Keuangan. 2. Standar Pemeriksaan Standar Pemeriksaan Keuangan Negara (SPKN) yang ditetapkan dengan Peraturan BPK Nomor I Tahun 2017. 3. Tujuan Pemeriksaan Pemeriksaan ini bertujuan untuk memberikan opini atas kewajaran Laporan Keuangan Pinjaman dan/atau Hibah Luar Negeri (PHLN) IEF TAP dengan mempertimbangkan: a. efektivitas pengendalian intern pengelolaan PHLN IEF TAP; b. kesesuaian penyajian aliran dana, belanja, dan aset yang dihasilkan PHLN IEF TAP; c. kecukupan pengungkapan dalam catatan atas laporan keuangan PHLN IEF TAP; dan d. kepatuhan terhadap ketentuan peraturan perundangan-undangan dan perjanjian terkait PHLN IEF TAP. 4. Entitas yang Diperiksa Entitas yang diperiksa adalah Badan Pengelola Dana Lingkungan Hidup (BPDLH) Kementerian Keuangan selaku executing agency yang mengelola IEF TAP Tahun 2023. 5. Lingkup Pemeriksaan Lingkup pemeriksaan adalah pengelolaan PHLN IEF TAP Tahun 2023, yang meliputi sasaran pemeriksaan: aliran dana, belanja, dan aset yang dihasilkan. 6. Metodologi Pemeriksaan Metodologi pemeriksaan ini mengacu pada Keputusan BPK RI Nomor 4/K/l-XIII.2/7/2014 tentang Petunjuk Pelaksanaan (Juklak) Pemeriksaan Keuangan dan Panduan Pemeriksaan PHLN Tahun 2018. Berdasarkan Juklak Pemeriksaan Keuangan, metodologi pemeriksaan terdiri dari: perencanaan, pelaksanaan, dan pelaporan. Dalam ketiga tahapan tersebut, pemeriksaan menggunakan pendekatan risiko, materialitas, dan uji petik. Secara garis besar teknik perolehan bukti yang digunakan dalam pemeriksaan ini yaitu: a. analisis proses bisnis pelaksanaan pengelolaan hibah, pengadaan barang, dan pengelolaan aset untuk pemetaan risiko; b. analisis dan validasi dokumen perencanaan dan pelaksanaan belanja; 3 c. wawancara dengan pihak-pihak terkait pengelolaan hibah, pengadaan barang, dan pengelolaan aset; d. konfirmasi kepada pihak terkait atas belanja barang/jasa untuk memastikan bahwa pembayaran dilakukan kepada pihak yang tepat; dan e. pengujian fisik atas aset yang dihasilkan dari belanja hibah untuk memastikan keberadaan barang/jasa dan kesesuaian dengan spesifikasi kontrak dan Berita Acara Serah Terima (BAST). 7. Jangka Waktu Pemeriksaan Jangka waktu pemeriksaan adalah selama 20 hari kerja. 8. Batasan Pemeriksaan Pemeriksaan BPK tidak ditujukan untuk menemukan kesalahan atau penyimpangan. Walaupun demikian, jika dari hasil pemeriksaan ditemukan penyimpangan, akan diungkapkan. Dalam pelaksanaannya, BPK menyadari kemungkinan adanya perbuatan melanggar hukum. BPK tidak memberikan jaminan bahwa semua tindakan melanggar hukum akan terdeteksi dan hanya memberikan jaminan yang wajar bahwa tindakan melanggar hukum yang berpengaruh secara langsung dan material terhadap angka-angka dalam laporan keuangan akan terdeteksi. BADAN PEMERIKSA KEUANGAN REPUBLIK INDONESIA 4 LAPORAN KEUANGAN TAHUN 2023 WORLD BANK GRANT TF0B5967 Indonesian Environment Fund Technical Assistance Project (audited) Prepared by: INDONESIAN ENVIRONMENT FUND JB TOWER, 30TH FLOOR JL. KEBON SIRIH NO.48-50, RT.11/RW.2, GAMBIR JAKARTA 10110 INDONESIA KATA PENGANTAR Laporan keuangan ini dibuat sebagai ringkasan terkait dengan keuangan proyek yang telah dilakukan sesuai dengan ketentuan Pemerintah dan SOP dalam Indonesian Environment Fund Technical Assistance Project (IEF TAP) untuk Badan Pengelola Dana Lingkungan Hidup (BPDLH) yang didanai oleh the World Bank dari Januari hingga Desember 2023. IEF TAP merupakan proyek yang didanai oleh World Bank untuk memberikan dukungan teknis kepada BPDLH dalam mengembangkan dan memperkuat kapasitas dan sistem operasional BPDLH. Melalui keberhasilan dukungan teknis ini, BPDLH diharapkan dapat menjadi lembaga pengelolaan dana yang memiliki kredibilitas tinggi yang diakui di dunia internasional untuk menerima, mengelola, dan mendistribusikan dana lingkungan hidup dan iklim kepada penerima manfaat. IEF TAP merupakan hibah langsung uang, barang, dan jasa yang dilaksanakan oleh BPDLH. Proyek ini berdurasi 40 (empat puluh) bulan (30 Juni 2021 – 31 Desember 2024) dengan total anggaran yang didanai The World Bank sebesar USD2,230,000. Pelaporan keuangan kepada The World Bank akan menjadi tanggung jawab tim pelaksana proyek dari BPDLH. Pada semester 1 & semester 2 tahun 2023 tercatat IEF TAP menyalurkan USD324,064.43 atau setara dengan Rp4.940.564.976,00. Dalam pelaksanaannya, dana proyek telah digunakan untuk pembayaran remunerasi konsultan individu baik time-based maupun output-based, pembayaran pengadaan paket meeting kegiatan dan biaya perjalanan capacity building BPDLH, pembayaran jasa Firma Komunikasi, pembayaran Firma MIS (Management Information System), pembayaran Paket Merchandise COP 28 UNFCCC. Demikian laporan ini kami buat, semoga dapat bermanfaat bagi semua pihak yang berkepentingan. Direktur Utama Badan Pengelola Dana Lingkungan Hidup Ditandatangani secara elektronik Joko Tri Haryanto ii | P a g e DAFTAR ISI KATA PENGANTAR................................................................................ II DAFTAR ISI............................................................................................ III DAFTAR TABEL ................................................................................... IV DAFTAR LAMPIRAN ............................................................................ IV RINGKASAN LAPORAN KEUANGAN .................................................. 6 SURAT PERNYATAAN TANGGUNG JAWAB ....................................... 7 ANNUAL FINANCIAL REPORT ................................................... 8 LAPORAN PENERIMAAN DAN PENGELUARAN .................... 11 LAPORAN AKTIVA DAN KEWAJIBAN ..................................... 12 PENJELASAN ATAS LAPORAN KEUANGAN ......................... 12 CATATAN ATAS LAPORAN KEUANGAN ................................. 17 INFORMASI PENTING LAINNYA .............................................. 22 PENUTUP ................................................................................... 27 iii | P a g e DAFTAR TABEL Tabel 1. Sources and Uses of Funds Tabel 2. Designated Account Activity Statement Tabel 3. Laporan Penerimaan dan Pengeluaran Tabel 4. Laporan Aktiva dan Kewajiban Tabel 5. Realisasi IEF TAP tahun 2023 berdasarkan Penggunaan Dana Tabel 6. Konversi Dana Proyek IEF TAP dari Trustee USD ke Trustee IDR Tabel 7. Rincian Belanja Modal MIS Hingga 31 Desember 2023 Tabel 8 Belanja Jasa Konsultan Individu Output-Based Tabel 9. Rincian SP3B BLU Tahun 2023 Tabel 10. Daftar Pengesahan Proyek IEF TAP Tahun 2023 DAFTAR LAMPIRAN Lampiran 1. Interim Financial Report (IFR) Kuartal 1 2023 Lampiran 2. Interim Financial Report (IFR) Kuartal 2 2023 Lampiran 3. Interim Financial Report (IFR) Kuartal 3 2023 Lampiran 4. Interim Financial Report (IFR) Kuartal 4 2023 Lampiran 5. Summary Statement of Expenditures Quarter 1 tahun 2023 Lampiran 6. Summary Statement of Expenditures Quarter 2 tahun 2023 Lampiran 7. Summary Statement of Expenditures Quarter 3 tahun 2023 Lampiran 8. Summary Statement of Expenditures Quarter 4 tahun 2023 iv | P a g e PERNYATAAN TELAH DIREVIU LAPORAN KEUANGAN INDONESIAN ENVIRONMENT FUND TECHNICAL ASSISTANCE PROJECT (IEF TAP) TAHUN ANGGARAN 2023 Kami telah mereviu Laporan Keuangan Indonesian Environment Fund Technical Assistance Project (IEF TAP) untuk TA 2023 berupa Laporan Aktiva dan Kewajiban per tanggal 31 Desember 2023, Project Sources and Uses of Funds, Designated Account Activity Statement, Laporan Penerimaan dan Pengeluaran, dan Catatan atas Laporan Keuangan dan Penjelasan atas Laporan Keuangan untuk periode yang berakhir pada tanggal tersebut sesuai dengan Standar Reviu atas Laporan Keuangan Kementerian Negara/Lembaga dan Laporan Keuangan Bendahara Umum Negara. Semua informasi yang dimuat dalam laporan keuangan adalah penyajian Tim Pengelola Indonesian Environment Fund Technical Assistance Project (IEF TAP). Reviu bertujuan untuk memberikan keyakinan terbatas mengenai akurasi, keandalan, dan keabsahan informasi, serta kesesuaian pengakuan, pengukuran, dan pelaporan transaksi dengan Standar Akuntansi Pemerintahan dan peraturan lain yang terkait. Reviu mempunyai lingkup yang jauh lebih sempit dibandingkan dengan lingkup audit yang dilakukan sesuai dengan peraturan terkait dengan tujuan untuk menyatakan pendapat atas laporan keuangan secara keseluruhan. Oleh karena itu, kami tidak memberi pendapat semacam itu. Berdasarkan reviu kami, tidak terdapat perbedaan yang menjadikan kami yakin bahwa laporan keuangan yang kami sebutkan di atas tidak disajikan sesuai dengan Standar Akuntansi Pemerintahan, Peraturan Direktur Utama BPDLH Nomor 18/BPDLH/2022 tentang Pedoman Penyaluran Dana Program Lingkungan Hidup, perjanjian/kontrak dengan World Bank, dan peraturan lain yang terkait. Jakarta, 16 Mei 2024 Kepala Satuan Pemeriksaan Intern Ditandatangani secara elektronik Sunu Soebroto 5|Page RINGKASAN LAPORAN KEUANGAN Laporan keuangan proyek Indonesian Environment Fund Technical Assistance Project (IEF TAP) periode tahun 2023 disusun berdasarkan Standar Operasional Prosedur (SOP) IEF TAP dan mengacu pada Peraturan Direktur Utama Badan Pengelola Dana Lingkungan Hidup Nomor 05/BPDLH/2021 tentang Pedoman Pengelolaan Dana Yang Bersumber Dari Pemberi Hibah Dan Donasi Pada Rekening Bank Kustodian Dan/Atau Trustee dan peraturan lain yang terkait. Laporan keuangan ini meliputi: 1. Interim Financial Report (IFR) Interim Financial Report (IFR) menggambarkan tentang penerimaan dan pengeluaran dana yang direalisasikan berdasarkan format dari World Bank. Pada periode pelaporan ini (periode tahun 2023), realisasi penggunaan dana IEF TAP yaitu sebesar Rp4.940.564.976,00 atau sebesar USD324,064.43. Kumulatif penggunaan dana sampai dengan periode pelaporan ini yaitu sebesar Rp9.219.560.664,52 atau sebesar USD614,450.31. 2. Designated Account Activity Statement (1-A) Designated Account Activity Statement merupakan pelaporan aktivitas rekening yang menyajikan informasi tentang penerimaan dan pengeluaran dana suatu periode. Kumulatif penarikan dana proyek IEF TAP ke rekening Trustee yang ditunjuk sampai dengan akhir periode pelaporan ini sebesar USD1,779,228.00. Penggunaan dana secara kumulatif sampai dengan periode pelaporan ini sebesar USD614,450.31. 3. Laporan Penerimaan dan Pengeluaran Laporan penerimaan dan pengeluaran menampilkan informasi mengenai penarikan dana yang dilakukan kepada donor dalam periode tertentu dan pengeluaran dana atas penarikan tersebur dalam periode tertentu. Penerimaan dana IEF TAP adalah sebesar USD92,980 yang diterima pada tanggal 6 Maret 2023 dan pada tanggal 27 November 2023 sebesar USD683,980.00. Total penerimaan dana pada tahun 2023 adalah sebesar USD776,960 atau setara kurs IDR sebesar Rp12.084.348.140,00 dengan Kurs dollar tengah BI tanggal 06 Maret 2023 sebesar Rp15.306 dan tanggal 27 November 2023 sebesar Rp15.587. Pengeluaran Dana IEF TAP langsung ke Penerima Manfaat pada tahun 2023 sebesar Rp4.940.564.976,00. 4. Laporan Aktiva dan Kewajiban Laporan posisi keuangan menampilkan data informasi mengenai jumlah aktiva dan kewajiban dalam periode tertentu. Kas dan setara Kas Dana IEF TAP pada tanggal 31 Desember 2023 adalah sebesar Rp17.957.097.570,34 yang merupakan penjumlahan dari konversi dari kurs mata uang USD sebesar USD1,155,344 dengan nilai kurs dollar tengah 29 Desember 2023 sebesar Rp15.416,00 ditambahkan dengan sisa kas dalam IDR sebesar Rp146.314.466,34. 5. Penjelasan Atas Laporan Keuangan Penjelasan atas Laporan Keuangan menjelaskan informasi tentang gambaran umum kegiatan, lingkup pekerjaan serta tujuan penyusunan laporan keuangan. Kemudian menampilkan nilai pengeluaran dana dalam Interim Financial Report dan Designated Account Activity Statement. 6. Catatan atas Laporan Keuangan Catatan atas Laporan Keuangan (CaLK) menyajikan informasi tentang penjelasan atau daftar terinci atau analisis atas nilai suatu pos yang disajikan dalam Laporan Penerimaan dan Pengeluaran, serta Laporan Aktiva dan Kewajiban. 6|Page SURAT PERNYATAAN TANGGUNG JAWAB Laporan Keuangan Indonesian Environment Fund Technical Assistance Project terdiri atas Interim Financial Report (Laporan Sumber dan Penggunaan Dana Proyek) dan Designated Account Activity Statement (Laporan Aktivitas Rekening yang Ditunjuk TF0B5967) untuk tahun yang berakhir 31 Desember 2023, Penjelasan atas Laporan Keuangan, dan Catatan atas Laporan Keuangan. Laporan ini adalah Tanggung Jawab kami. Laporan Keuangan Hibah Luar Negeri Proyek IEF TAP Periode Januari - Desember 2023 ini telah disusun berdasarkan sistem pengendalian internal yang memadai, serta menyajikan informasi realisasi jumlah dana yang dihimpun dan rincian pengunaan dana untuk periode 1 Januari 2023 sampai dengan 31 Desember 2023. Pengelolaan dana tersebut dilaksanakan sesuai dengan Standar Operasional Prosedur Indonesia Environment Fund Technical Assistance Project (IEF TAP). Dalam menyusun laporan keuangan dan mengelola Proyek Hibah ini, kami selaku pihak yang bertanggung jawab menyatakan bahwa kami: 1. Menggunakan dana hibah luar negeri proyek Indonesia Environment Fund Technical Assistance Project (IEF TAP) sesuai dengan tujuan yang telah ditetapkan. 2. Melakukan pengeluaran dengan didukung bukti-bukti yang memadai. 3. Melaksanakan pengendalian internal yang memadai termasuk atas pengadaan barang dan jasa yang dibiayai dari hibah sesuai dengan ketentuan yang diatur dalam The World Bank Procurement Regulations for IPF Borrowers: Procurement in Investment Project Financing Goods, Works, Non-Consulting and Consulting Services Fourth Edition November 2020. Jakarta, 27 Juni 2024 Direktur Utama Badan Pengelola Dana Lingkungan Hidup Ditandatangani secara elektronik Joko Tri Haryanto 7|Page ANNUAL FINANCIAL REPORT INTERIM FINANCIAL REPORT (IFR-1) Indonesian Environment Fund Technical Assistance Project Sources and Uses of Funds for the year ended 2023 currency: USD Tabel 1. Sources and Uses of Funds Year to date Cumulative to date Sources and use of fund in IDR in USD in IDR in USD Sources of Funds GOI (Counterpart) The World Bank 4.940.564.976 324,064.43 9.219.560.664,52 614,450.31 Other Donor/lender Total Sources of Fund Uses of Funds (by Category) Goods, Consultant, Training & 1 Operating Cost a. Strengthening Operational Systems 2.783.765.906 182,587.54 4.050.881.900,00 267,902.37 b. Project Management and Institutional Capacity Building 2.156.799.070 141,476.88 5.168.678.764,52 346,547.94 Non-Bank Financed (Rupiah Murni) Total Uses of Fund 4.940.564.976 324,064.43 9.219.560.664,52 614,450.31 8|Page DESIGNATED ACCOUNT ACTIVITY STATEMENT Indonesian Environment Fund Technical Assistance Project Designated Account Activity Statement TF0B5967 For Year Ended 2023 Tabel 2. Designated Account Activity Statement Bank and Account No.: TF No. USD Part I 1. Cummulative advances to end of current reporting period 1.779.228,00 2. Cummulative expenditures to end of last reporting period 290.385,88 3. Outstanding advances to be accounted (1-2) 1.488.842,12 Part II 4. Opening DA balance at beginning of reporting period (as of January 1st 2023 ) 710.865,00 5. Add/Substract:Cummulative adjustments (if any) * 977,12 6. Advances from the World Bank during reporting period 777.000,00 7.add 5 and 6 777.977,12 8. Outstanding advances to be accounted for (4+7) (must be same as item 3) 1.488.842,12 9. Closing DA balance at end of current reporting ( December 31th 2023 ) 1.155.344,00 10. Add/substract: Cummulative adjusment (if any) ** 40,00 11. Expenditures for current reporting period 324.064,43 12. Add 10+11 324.104,43 13. Add 9+12 1.479.448,43 14. Difference (if any) 8-13 *** 9.393,69 9|Page =================== * Explanation for item 5 (if not zero): FMR & AW Ref. Amount (+/-) Remarks Interest (November 2022) - 8,00 Interest (December 2022) - 25,00 Foreign Exchange 40,00 Advance to IDR account Rp16.000.375,34 970,12 977,12 ** Explanation for item 10 (if not Zero): FMR & AW Ref. Amount (+/-) Remarks Bank charges 1st Semester 2023 20,00 Bank charges 2nd Semester 2023 20,00 40,00 *** Explanation for item 14 (if not Zero): FMR & AW Ref. Amount (+/-) Remarks Advance to ID Account Rp146.314.466,34 9.491,08 Interest (Jan 2023) - 30,00 Tax (Jan 2023) 6,00 Interest (Feb 2023) - 30,00 Interest (Mar 2023) - 3,00 Foreign Exchange - 44,90 Bank Charge Transactions Rp.69.500 4,51 9.393,69 **** Explanation for item 17 (if not Zero): FMR & AW Ref. Amount (+/-) Remarks - - - 10 | P a g e LAPORAN PENERIMAAN DAN PENGELUARAN DANA INDONESIAN ENVIRONMENT FUND TECHNICAL ASSISTANCE PROJECT (IEF TAP) LAPORAN PENERIMAAN DAN PENGELUARAN TAHUN 2023 Tabel 3. Laporan Penerimaan dan Pengeluaran 2023 2022 A. PENERIMAAN DANA PROJECT IEF TAP A.1 Penerimaan Dana* 12.084.348.140 13.307.796.760 A.2 Lain-lain 949.557 647.871 JUMLAH PENERIMAAN 12.085.297.697 13.308.444.631 B. PENGELUARAN DANA PROJECT IEF TAP B.1 Langsung ke Penerima Manfaat 4.940.564.976 3.264.236.899 B.2 Tidak langsung ke Lembaga Perantara 0 0 Lain-lain 0 0 C. PENGELUARAN DANA PROJECT IEF TAP LAINNYA C.1 Biaya Atas Layanan 0 0 C.2 Lain-lain 89.580 125.848 JUMLAH PENGELUARAN 4.940.654.556 3.264.362.747 D. TOTAL JUMLAH KOMITMEN DANA PROJECT IEF 32.195.310.000 30.128.700.000 TAP** E. TOTAL JUMLAH PENERIMAAN DANA PROJECT 12.085.297.697 13.308.444.631 IEF TAP F. TOTAL JUMLAH PENGELUARAN DANA PROJECT 4.940.654.556 3.264.362.747 IEF TAP Note: kurs dollar tengah 29 Desember 2023: Rp15.416,00 *Kurs dollar tengah BI tanggal 06 Maret 2023 sebesar Rp15.306 dan tanggal 27 November 2023 sebesar Rp15.587 **Kurs dollar Rp14.347 (Grant Agreement Exchange Rate Effective 27 Mei 2021) dan kurs dollar tengah BI Rp15.897 (addendum grant Agreement tanggal 1 November 2023 penambahan dana USD130,000) 11 | P a g e LAPORAN AKTIVA DAN KEWAJIBAN DANA INDONESIAN ENVIRONMENT FUND TECHNICAL ASSISTANCE (IEF TAP) LAPORAN AKTIVA DAN KEWAJIBAN TAHUN 2023 Tabel 4. Laporan Aktiva dan Kewajiban 2023 2022 A. AKTIVA A.1 Kas dan setara kas 17.957.097.570 11.198.617.690 *) A.2 Aset Tetap 384.848.790 384.848.790 A.3 Persediaan yang akan diserahkan 0 0 kepada Penerima Manfaat A.4 Aktiva Lainnya 1.348.604.387 0 JUMLAH AKTIVA 19.690.550.747 11.583.466.480 *) B. KEWAJIBAN JANGKA PENDEK B.1 Utang kepada Supplier 0 0 B.2 Utang Operasional 0 0 C. KEWAJIBAN LAINNYA C.1 Lain-lain 0 0 D. JUMLAH KEWAJIBAN 0 0 Note: kurs dollar tengah 29 Desember 2023: Rp15.416,00 *Merupakan konversi dari USD1,155,344 dijumlah dengan sisa kas dalam IDR sebesar Rp146.314.466,34 Penjelasan Atas Laporan Keuangan 4.1. GAMBARAN UMUM i. Pendahuluan Indonesia adalah penghasil gas rumah kaca (GRK) terbesar keenam secara global, deforestasi dan degradasi hutan merupakan 53 persen dari emisi GRK nasional. Pemerintah Indonesia telah membuat komitmen internasional untuk mengurangi emisi GRK, dengan mengakui bahwa sektor tata guna lahan dan kehutanan merupakan sumber utama emisi. Pada pertemuan Konferensi Para Pihak di Paris pada tahun 2015, Pemerintah Indonesia berjanji melalui Kontribusi yang Ditentukan Secara Nasional (NDC) untuk mengurangi emisi GRK sebesar 41 persen pada tahun 2030 dengan bantuan internasional (29 persen dengan sumber dayanya sendiri) relatif terhadap Business as Usual (BAU). Target ini masuk akal jika dilakukan tindakan tertentu untuk mengurangi emisi gas rumah kaca di semua 5 sektor: energi (11% - 14%), limbah (0,38%- 1 %), industri pengolahan dan penggunaan produk/IPPU (0,1%- 0,11%), pertanian (0,32%-0,13%), dan kehutanan (17,2% - 23%). Jika digabungkan, total pengurangan emisi gas rumah kaca dari sektor-sektor ini akan berkurang dari sekitar 1.334 mtCO2e (2010) menjadi 834 - 1.081 mtCO2e pada tahun 2030. 12 | P a g e Untuk memenuhi komitmen pembangunan berkelanjutan dan keuangan hijau Pemerintah Indonesia yang ambisius dan telah berlangsung lama, Pemerintah Indonesia meluncurkan Badan Pengelola Dana Lingkungan Hidup Indonesia (BPDLH) melalui Peraturan Menteri Keuangan No. 137/2019 pada Oktober 2019. BPDLH bertujuan untuk meningkatkan tingkat keuangan hijau di Indonesia dan akan menjadi mekanisme resmi untuk mengelola dan mengkoordinasikan dana lingkungan dan iklim termasuk dari sumber internasional. BPDLH adalah unit non-eselon di bawah Kementerian Keuangan (Kemenkeu) yang memiliki mandat untuk mengelola dana yang berkontribusi pada perbaikan lingkungan dan mencakup investasi hijau di sektor-sektor termasuk kehutanan, energi dan sumber daya mineral, industri, transportasi, pertanian, kelautan, dan perikanan. BPDLH dipimpin oleh seorang Direktur Utama dengan pengawasan dari Komite Pengarah yang diketuai oleh Kementerian Koordinator Bidang Perekonomian (CMEA) dengan keterlibatan kunci dari Kementerian Lingkungan Hidup dan Kehutanan (KLHK). BPDLH diharapkan dapat bekerja dengan beberapa kementerian yang memiliki mandat terkait isu lingkungan, pemerintah daerah, organisasi masyarakat sipil, dan masyarakat lokal. BPDLH di bawah IEF TAP yang didanai oleh World Bank menyewa konsultan berikut untuk bekerja sama dengan BPDLH untuk memberikan bantuan teknis guna secara efektif mengoperasionalkan sistem manajemen risiko lingkungan dan sosial organisasi, memastikan bahwa ini mematuhi persyaratan nasional dan internasional.  Senior Adviser Institutional Development Specialist;  Institutional Development Specialist  Legal specialists;  Social safeguard specialist;  Land acquisition specialist;  Environmental safeguard specialist;  Communication Engagement Stakeholders specialist;  Administrative staff;  Project Associate  Program development specialist;  Monitoring and Evaluation (M&E) specialist;  Translator for ESMS Documents for Project Implementation  Senior Communication Specialist  Communication Officer  Social Media Officer  Graphic Designer  Firma Management Information System (MIS);  Firma Strategi Komunikasi dan Capacity Building. Proyek ini dilaksanakan dalam waktu 40 (empat puluh) bulan (30 Juni 2021 – 31 Desember 2024) dengan total anggaran yang didanai oleh World Bank sebesar USD2,230,000. 13 | P a g e Pelaporan keuangan ke World Bank akan menjadi tanggung jawab Tim Client Connection dari BPDLH. ii. LINGKUP PEKERJAAN Lingkup kerja utama untuk IEF TAP ini termasuk memberikan nasihat tentang hukum, strategi penggalangan dana, perlindungan lingkungan dan sosial, pengembangan program, MIS, M&E, Administrasi dan Pengadaan yang akan mendukung BPDLH untuk menjadi Pengelola Dana Lingkungan terkemuka yang profesional, kredibel, dan dipercaya secara global. Selanjutnya, tujuan IEF TAP adalah untuk memperkuat sistem operasional dan kapasitas penerima dana lingkungan untuk menerima dan mengelola dana lingkungan dan iklim. Komponen IEF TAP adalah: Komponen 1: Penguatan Sistem Operasi Komponen 2: Manajemen Proyek dan Peningkatan Kapasitas Kelembagaan iii. TUJUAN PENYUSUNAN LAPORAN KEUANGAN Secara umum, laporan ini bertujuan untuk secara jelas mendefinisikan kemajuan terkini IEF TAP dalam periode Januari hingga Desember 2023. Laporan ini juga membahas strategi dan pendekatan mitigasi yang akan diterapkan oleh konsultan untuk memberikan bantuan teknis bagi BPDLH. Laporan Keuangan PHLN merupakan Laporan Keuangan bertujuan khusus untuk akuntabilitas penggunaan dana PHLN kepada pemberi pinjaman dan/atau donor sesuai dengan yang dipersyaratkan dalam perjanjian PHLN. Laporan Keuangan PHLN disusun dengan mengacu pada standar atau kebijakan akuntansi secara khusus yang ditetapkan oleh pemberi pinjaman dan/atau donor pada masing-masing perjanjian PHLN. 4.2. CATATAN ATAS INTERIM FINANCIAL REPORT (IFR-1) Laporan Sumber dan Penggunaan Dana Proyek atau IFR-1 menjelaskan sumber dana dari proyek yang dilaksanakan, apakah dari Pemerintah (APBN), hibah the World Bank ataupun hibah/ pinjaman lainnya. Laporan Sumber dan Penggunaan Dana Proyek juga menjelaskan kategori dan besaran penggunaan dana pada kuartal berjalan dan akumulasinya. Dalam laporan ini, dapat diketahui persentase penggunaan dana proyek berdasarkan perencanaan penggunaan dana dan aktualisasi penggunaan dana. Laporan Aktivitas Rekening yang Ditunjuk (Designated Account Activity Statement) merupakan format pelaporan aktivitas rekening dari World Bank. Laporan ini menyajikan informasi tentang penerimaan dan pengeluaran dalam rekening selama suatu periode. IEF TAP mempunyai 2 rekening Trustee, yaitu rekening dalam mata uang USD (019301003662309 BPDLH QQ IEF TA PROJECT BY WB) dan rekening dalam mata uang Rupiah (019302000295303 BPDLH QQ IEF TA PROJECT BY WB). World Bank akan mengirimkan dana hibah ke dalam rekening Trustee mata uang USD. i. Laporan Sumber dan Penggunaan Dana Project / Interim Financial Report (IFR-1) Laporan Sumber dan Penggunaan Dana Project atau IFR-1 menjelaskan sumber dana dari proyek yang dilaksanakan, apakah dari Pemerintah (APBN), hibah the World Bank ataupun hibah/ pinjaman lainnya. Laporan Sumber dan Penggunaan Dana Project juga menjelaskan kategori dan besaran penggunaan dana pada kuartal berjalan dan akumulasinya. Dalam 14 | P a g e laporan ini, dapat diketahui persentase penggunaan dana project berdasarkan perencanaan penggunaan dana dan aktualisasi penggunaan dana. Sumber dana IEF TAP berasal hanya dari dana hibah the World Bank saja. Pada periode pelaporan ini (periode tahun 2023), realisasi penggunaan dana IEF TAP yaitu sebesar Rp4.940.564.976,00 atau sebesar USD324,064.43. Kumulatif penggunaan dana sampai dengan periode pelaporan ini yaitu sebesar Rp9.219.560.664,52 atau sebesar USD614,450.31. Rincian penggunaan dana tahun 2023 terdiri dari 2 komponen sesuai dengan tujuan proyek di antara lain: a. Strengthening Operational Sytem sebesar USD182,587.54 b. Project Management and Institutional Capacity Building sebesar USD141,476.88 Penggunaan dana diperuntukan untuk pembayaran remunerasi konsultan individu baik time- based maupun output-based, pembayaran pengadaan paket meeting kegiatan dan biaya perjalanan capacity building BPDLH, pembayaran jasa Firma Komunikasi, pembayaran Firma MIS (Management Information System), serta pembayaran Paket Merchandise COP 28 UNFCCC. Tabel 5. Realisasi IEF TAP tahun 2023 berdasarkan Penggunaan Dana No Penggunaan Dana Realisasi (Rp) 1 ID-BLU BPDLH-245206-CS-INDV / Administrative Staff 27.847.619 2 ID-BLU BPDLH-247187-CS-INDV / Administrative Staff 15.561.905 3 ID-BLU BPDLH-245210-CS-INDV / Senior Legal Specialist 330.420.000 4 ID-BLU BPDLH-245217-CS-INDV / Senior Legal Specialist 317.484.000 5 ID-BLU BPDLH-245222-CS-INDV/ Environment Safeguard Specialist 205.360.000 6 ID-BLU BPDLH-245214-CS-INDV/ Institutional Development Specialist 241.462.857 7 ID-BLU BPDLH-340947-CS-INDV / Project Associate 62.857.143 8 ID-BLU BPDLH-341150-CS-INDV / Communication Officer (outreach & internal) 128.838.095 9 ID-BLU BPDLH-341147-CS-INDV / Senior Communication Specialist 190.504.762 10 ID-BLU BPDLH-341180-CS-INDV / Graphic Designer 77.308.571 11 ID-BLU BPDLH-341179-CS-INDV / Social Media 95.942.857 12 ID-BLU BPDLH-327668-CS-INDV / Monitoring & Evaluation System Specialist 180.000.000 ID-BLU BPDLH-245208-CS-INDV/ Senior Adviser Institutional Development 13 270.000.000 Specialist 14 ID-BLU BPDLH-327660-CS-INDV / Senior Program Development Specialist 420.000.000 15 ID-BLU BPDLH-378668-CS-INDV/ Project Associate 60.428.571 16 ID-BLU BPDLH-379784-CS-INDV/ Environment Safeguard Specialist** 90.476.190 17 ID-BLU BPDLH-374088-CS-INDV / Document Translator 62.200.000 18 ID-BLU BPDLH-245690-CS-CQS/ Communication Strategy and Capacity Building 690.067.234 19 Paket Meeting 35.866.800 ID-BLU BPDLH-245689-CS-QCBS / a Firm for Management Information System 20 1.348.604.387 (MIS) & (M&E) 21 Transportation Tickets for Capacity Building Individual Consultant TA-WB 16.833.985 ID-BLU BPDLH-381403-CS-QCBS/a Firm for Production (company profile & short 22 72.500.000 films, social media production, merchandise, booklet flyer report etc) Total Realisasi Tahun 2023 4.940.564.976 Terdapat perbedaan total nilai sebesar USD210.02 yaitu terkait penggunaan dana IEF TAP antara Interim Financial Report (IFR-1) sebesar USD324,064.43 dengan Lampiran 4. IFR Quarter 4 tahun 2023 sebesar USD323,854.41. Hal tersebut disebabkan perbedaan nilai kurs 15 | P a g e yaitu saat dilakukannya konversi mata uang USD ke Rupiah pada seluruh pengeluaran dana kegiatan IEF TAP tahun 2023 dengan nilai kurs tengah BI tanggal 29 Desember 2023, serta metode FIFO (First In First Out) nilai kurs atas urutan tanggal pemindahbukuan dana. Penjelasan perbedaan total nilai tersebut juga akan disampaikan kepada World Bank saat pelaporan Interim Financial Report Quarter 1 tahun 2024. ii. Laporan Aktivitas Rekening yang Ditunjuk / Designated Account Activity Statement (1-A) Laporan Aktivitas Rekening yang Ditunjuk merupakan format pelaporan aktivitas rekening dari the World Bank. Laporan ini menyajikan informasi tentang penerimaan dan pengeluaran dalam rekening selama suatu periode. Dalam laporan ini juga terdapat kolom permintaan dana untuk proyek setiap 6 bulan (2 periode pelaporan). IEF TAP Project mempunyai 2 rekening Trustee, yaitu rekening dalam mata uang USD (019301003662309 BPDLH QQ IEF TA PROJECT BY WB) dan rekening dalam mata uang Rupiah (019302000295303 BPDLH QQ IEF TA PROJECT BY WB). The World Bank akan mengirimkan dana hibah ke dalam rekening Trustee mata uang USD. Terdapat penerimaan dana sebesar USD777,000 yang masuk pada bulan Maret 2023 sebesar USD93,000.00 serta pada bulan November 2023 sebesar USD 684,000.00. Permintaan dana tersebut dipotong biaya transaksi sebesar USD20 pada setiap permintaannya, sehingga dana yang masuk ke Bank Trustee dipotong sebesar USD40.00 Kumulatif penarikan dana IEF TAP ke rekening Trustee yang ditunjuk sampai dengan akhir periode pelaporan ini sebesar USD1,779,228.00. Jumlah dana di rekening awal periode pelaporan ini sebesar USD710,865.00. Pada item nomor 14 terdapat selisih yang dijelaskan dengan rincian antara lain, saldo akhir tahun 2023 sebesar Rp146.314.466,34 yang berada di rekening Trustee Rupiah (019302000295303 BPDLH QQ IEF TA PROJECT BY WB) dilakukan konversi dengan menggunakan kurs tengah BI tanggal 29 Desember 2023 Rp15.416 sehingga total menjadi USD9,491.08. Terdapat bunga bank bulan Januari USD30, Februari USD30, Maret USD3 serta pajak bank bulan Januari USD6. Terdapat biaya transaksi bank sebesar USD4.51 yang merupakan hasil konversi Rp69.500 dengan kurs nilai tengah BI tanggal 29 Desember 2023 sebesar Rp15.416. Sedangkan selisih senilai USD44.90 disebabkan perbedaan nilai kurs yaitu saat dilakukannya konversi mata uang USD ke Rupiah pada tanggal pemindahbukuan terakhir dengan nilai kurs tengah BI tanggal 29 Desember 2023 Selama periode proyek yang berlangsung dari bulan Januari - Desember 2023, telah dilakukan konversi dan pemindahbukuan dana dari rekening Trustee USD ke rekening Trustee IDR dengan rincian sebagai berikut: Tabel 6. Konversi Dana Proyek IEF TAP dari Trustee USD ke Trustee IDR Tanggal Keterangan Nilai (USD) Pemindahbukuan 02 Februari 2023 Konversi USD ke Rupiah ke-1 6,873.00 27 Februari 2023 Konversi USD ke Rupiah ke-2 26,553.00 28 Februari 2023 Konversi USD ke Rupiah ke-3 78,000.00 26 April 2023 Konversi USD ke Rupiah ke-4 11,690.00 16 Mei 2023 Konversi USD ke Rupiah ke-5 14,323.00 16 | P a g e Tanggal Keterangan Nilai (USD) Pemindahbukuan 31 Mei 2023 Konversi USD ke Rupiah ke-6 2,474.00 22 Juni 2023 Konversi USD ke Rupiah ke-7 14,161.00 01 Agustus 2023 Konversi USD ke Rupiah ke-8 46,224.00 09 Agustus 2023 Konversi USD ke Rupiah ke-9 49,722.00 05 Oktober 2023 Konversi USD ke Rupiah ke-10 24,664.00 15 November 2023 Konversi USD ke Rupiah ke-11 33,496.00 20 Desember 2023 Konversi USD ke Rupiah ke-12 24,358.00 CATATAN ATAS LAPORAN KEUANGAN 5.1. CATATAN ATAS LAPORAN PENERIMAAN DAN PENGELUARAN 5.1.1. PENERIMAAN DANA IEF TAP i. Penerimaan Dana Penerimaan Dana IEF TAP bersumber dari dana hibah the World Bank yang diberikan secara bertahap. Pemberian dana hibah tahap pertama diberikan pada tanggal 2 September 2021 ke nomor rekening 0193-02-000295-30-3 dalam bentuk mata uang kurs Dollar sebesar USD156,208 atau setara kurs IDR sebesar Rp2.244.708.960,00 dengan nilai kurs dollar tengah 31 Desember 2021 sebesar Rp14.370,00. Pada tahun 2022 (1 Januari- 31 Desember 2022), penerimaan dana IEF TAP adalah sebesar USD174,980 yang diterima pada tanggal 14 Februari 2022 dan pada tanggal 18 Agustus 2022 sebesar USD670,980. Penerimaan dana adalah sebesar USD845,960 atau setara kurs IDR sebesar Rp13.307.796.760,00 dengan nilai kurs dollar tengah 31 Desember 2022 sebesar Rp15.731,00. Pada tahun 2023 (1 Januari – 31 Desember 2023), penerimaan dana IEF TAP adalah sebesar USD92,980 yang diterima pada tanggal 6 Maret 2023 dan pada tanggal 27 November 2023 sebesar USD683,980.00. Total penerimaan dana pada tahun 2023 adalah sebesar USD776,960 atau setara kurs IDR sebesar Rp12.084.348.140,00 dengan Kurs dollar tengah BI tanggal 06 Maret 2023 sebesar Rp15.306 dan tanggal 27 November 2023 sebesar Rp15.587. ii. Lain-Lain Terdapat penerimaan dana lain-lain IEF TAP yang merupakan bunga bank rekening trustee sebesar USD30.00 pada bulan Januari 2023, USD30.00 pada bulan Februari 2023 dan USD3.00 pada bulan Maret 2023. Total penerimaan dana lain-lain sebesar USD63.00 atau setara kurs IDR sebesar Rp949.557,00 dengan nilai kurs dollar tengah BI tanggal 25 Januari 2023 sebesar Rp14.930, tanggal 24 Februari 2023 sebesar Rp15.187, serta 25 Maret 2023 sebesar Rp15.349. 17 | P a g e 5.1.2. PENGELUARAN DANA IEF TAP i. Langsung Ke Penerima Manfaat Pengeluaran Dana IEF TAP dibayarkan dalam bentuk kurs mata uang IDR yang merupakan konversi dari kurs USD dalam setiap periode transaksi pembayaran. Jumlah Pengeluaran Dana IEF TAP langsung ke Penerima Manfaat pada tahun 2023 sebesar Rp4.940.564.976,00 yang disalurkan dari rekening 0193-01-003662-30-9 digunakan untuk pembayaran remunerasi konsultan individu baik time-based maupun output-based, pembayaran pengadaan paket meeting kegiatan dan biaya perjalanan capacity building BPDLH, pembayaran jasa Firma Komunikasi, pembayaran Firma MIS (Management Information System), pembayaran Paket Merchandise COP 28 UNFCCC. ii. Tidak Langsung Ke Lembaga Perantara Pengeluaran Dana IEF TAP tidak langsung ke Lembaga Perantara tahun 2023 adalah sebesar Rp0,00. iii. Lain-Lain Pengeluaran Dana IEF TAP lain-lain tahun 2023 adalah sebesar Rp0,00. 5.1.3. PENGELUARAN DANA IEF TAP LAINNYA i. Biaya Atas Layanan Pengeluaran Dana IEF TAP lainnya pada biaya atas layanan tahun 2023 adalah sebesar Rp0,00. ii. Lain-Lain Terdapat pengeluaran dana IEF TAP lainnya pada lain-lain tahun 2023 yaitu sebesar USD6.00 pada tanggal 25 Januari 2023 atau setara kurs IDR sebesar Rp89.580,00 yang merupakan pajak bunga rekening bank trustee. 5.1.4. TOTAL JUMLAH KOMITMEN DANA IEF TAP Total jumlah Komitmen Dana IEF TAP tahun 2023 adalah sebesar Rp32.195.310.000,00. Atau sebesar USD2,230,000 dengan nilai kurs dollar Rp14.347 (Grant Agreement Exchange Rate Effective 27 Mei 2021) untuk dana hibah sebesar USD2,100,000 serta nilai kurs tengah BI tanggal 1 November 2023 sebesar Rp15.897. Nilai kurs tersebut sesuai dengan tanggal Addendum Perjanjian perpanjangan waktu dan penambahan dana hibah sebesar USD130,000. 5.1.5. TOTAL JUMLAH PENERIMAAN DANA IEF TAP Total jumlah Penerimaan Dana IEF TAP tahun 2023 adalah sebesar Rp12.085.297.697. 5.1.6. TOTAL JUMLAH PENGELUARAN DANA IEF TAP Total jumlah Pengeluaran Dana IEF TAP tahun 2023 adalah sebesar Rp4.940.654.556,00. 18 | P a g e 5.2. CATATAN ATAS LAPORAN AKTIVA DAN KEWAJIBAN 5.2.1. AKTIVA i. Kas Dan Setara Kas Kas dan setara Kas Dana IEF TAP pada tanggal 31 Desember 2023 adalah sebesar Rp17.957.097.570,34 yang merupakan penjumlahan dari konversi dari kurs mata uang USD sebesar USD1,155,344 dengan nilai kurs dollar tengah 29 Desember 2023 sebesar Rp15.416,00 ditambahkan dengan sisa kas dalam IDR sebesar Rp146.314.466,34. ii. Aset Tetap Aset tetap Dana IEF TAP sampai dengan tanggal 31 Desember 2023 adalah sebesar Rp384.848.790,00 yang berupa empat belas unit laptop Macbook Pro senilai Rp366.982.000,00 dan HP Color Laserjet Pro MFP M479fdw sebanyak 1 unit senilai Rp17.866.790,00. Aset tetap telah diserahterimakan kepada BPDLH pada tanggal 26 November 2021 sesuai dengan BAST BA-1/WB-IEF/PROC/SC/XI/PD.1/BAPP/2021. Aset tersebut telah ditetapkan status penggunaannya oleh Pengguna Barang. iii. Persediaan Yang Akan Diserahkan Ke Penerima Manfaat Persediaan yang akan diserahkan ke Penerima Manfaat pada Dana IEF TAP sampai tanggal 31 Desember 2023 adalah sebesar Rp0,00. iv. Aktiva Lainnya Aktiva lainnya pada Dana IEF TAP sampai dengan tanggal 31 Desember 2023 adalah sebesar Rp1.348.604.387 yang bersumber dari belanja modal atas pengadaan MIS (Management Information System) dalam rangka penguatan sistem operasi di BPDLH dengan rincian sebagai berikut: Tabel 7. Rincian Belanja Modal MIS Hingga 31 Desember 2023 Activity Details Modul Amount VAT/PPN (IDR) Total (IDR) 1 Initial Detailed Requirement Gathering 90.000.000 9.900.000 99.900.000 2 System Analysis 157.000.000 17.270.000 174.270.000 1. Presentation and Approved Workpan 3 Design Analysis 100.000.000 11.000.000 111.000.000 4 Presentation System Analysis 10.301.250 1.133.138 11.434.387 Sub Total 396.604.387 Activity Details Modul Total (IDR) 3 Proposal Submissions - - 50.000.000 4 Proposal Evaluation - - 50.000.000 5 Proposal Approval - - 50.000.000 2. Approved detailed analysis and 6 Spatial System - - 250.000.000 system design and report of the MIS 7 Result Framework (indicators & target) - - 100.000.000 9 E-Procurement - - 50.000.000 11 Budgeting - - 50.000.000 13 Beneficiaries Result Reporting Monitoring & Evaluation - - 100.000.000 Sub Total 700.000.000 Activity Details Modul Total (IDR) 4 Spatial System - - 42.000.000 5 Collateral Evaluation and Management - - 42.000.000 Activity 3. Conceptual Design 6 Expenditure/Grant - - 42.000.000 (protototype or CRP version of the MIS 9 Runds Seporting - - 42.000.000 10 Purchasing - - 42.000.000 12 Receipts Management - - 42.000.000 Sub Total 252.000.000 Total Keseluruhan 1.348.604.387 19 | P a g e 5.2.2. Kewajiban Jangka Pendek i. Utang Kepada Supplier Utang kepada Supplier pada Dana IEF TAP sampai dengan tanggal 31 Desember 2023 adalah sebesar Rp0,00. ii. Utang Operasional Utang Operasional pada Dana IEF TAP sampai dengan tanggal 31 Desember 2023 adalah sebesar Rp0,00. 5.2.3. Kewajiban Lainnya i. Lain-Lain Kewajiban lainnya pada Dana IEF TAP sampai dengan tanggal 31 Desember 2023 adalah sebesar Rp0,00. 5.2.4. Jumlah Kewajiban Jumlah Kewajiban pada Dana IEF TAP sampai dengan tanggal 31 Desember 2023 adalah sebesar Rp0,00. 5.2.5. Pengungkapan Lainnya Selain aktiva tersebut di atas, Dana IEF TAP juga melaksanakan belanja barang dan jasa untuk penyusunan beberapa dokumen. Per tanggal 31 Desember 2023 belanja barang dan jasa untuk menghasilkan dokumen-dokumen dimaksud adalah sebesar Rp2.998.326.086,00. dengan rincian sebagaimana tabel di bawah ini: Tabel 8. Tabel Belanja Jasa Konsultan Individu Output-Based No. Kegiatan Nilai Pekerjaan Dokumen a) Monitoring and Evaluation Road Map; b) Technical inputs for theory of change, M&E and results framework; c) Templates for M&E and results management; d) Indicator manual; Monitoring and 1 Rp265.800.000,00 e) M&E manual; Evaluation f) Conceptual design of M&E dashboard, procedures and data flow for the MIS application; g) Training plan and delivery of capacity building support to BPDLH Information and Technology System Division. Management Dokumen Perencanaan Strategis Sistem 2 Information Rp328.000.000,00 Informasi. Systems Program Dokumen Strategic Programme Document 3 Rp360.000.000,00 Development Indonesia Environment Fund. 20 | P a g e No. Kegiatan Nilai Pekerjaan Dokumen Fundraising Dokumen Fundraising Strategy for Indonesia 4 Rp324.000.000,00 Strategy Environment Fund. a) film/video profil organisasi BPDLH; dan Firma 5 Rp430.458.852,00 b) buku Badan Pengelola Lingkungan Hidup Komunikasi Profil Program dan Cerita Sukses 1. Inception report, outlining workplan, methods and proposed M&E systems design.Technical inputs for theory of change, M&E and results framework; 2. Draft on the following: 3. Conceptual design on M&E systems. 4. Various M&E tools and instruments. 5. Various reporting format.Templates for Monitoring and M&E and results management; 6 Rp180.000.000,00 Evaluation 6. First draft on MEL Plan and its guidelines; Training modules on M&E systems; Report on training workshops.M&E manual; 7. Final draft on MEL Plan, encompasses M&E systems, various M&E tools and instrument, and various reporting templates; IEF’s organizational annual and/or progress report formulated from consolidated result of the existing windows 1. Inception report outlining methodology and workplan in formulating deliverables. 2. Revised (Final) version of IEF’s Strategic Program Programme Document, which incorporated 7 Development Rp420.000.000,00 inputs from related line-ministries through Specialist consultation process. 3. IEF’s Investment Frameworks for five (5) thematic programmes 1. Coffee table book BPDLH untuk COP 27 Firma 2. Blue print komunikasi BPDLH 8 Rp690.067.234,00 Komunikasi 3. Website manajemen BPDLH 4. Pedoman pembentukan tim komunikasi 21 | P a g e INFORMASI PENTING LAINNYA Kegiatan IEF TAP tahun 2023 terdapat Addendum Perjanjian antara World Bank dan BPDLH. Dokumen Addendum Perjanjian tersebut menyepakati adanya perpanjangan waktu perjanjian dana hibah proyek hingga tanggal 31 Desember 2024 dan adanya penambahan dana hibah yang diberikan sebesar USD130,000, sehingga dana hibah proyek IEF TAP keseluruhan sebesar USD2,230,000. Pemenuhan konsultan individu sampai dengan bulan Desember 2023 adalah sebanyak 17 (tujuh belas) posisi konsultan individu yang terdiri dari: Senior Adviser Institutional Development Specialist; Institutional Development Specialist, Legal specialists (2 orang); Social safeguard specialist; Land acquisition specialist; Environmental safeguard specialist; Administrative staff (2 orang); Project Associate; Program development specialist; Monitoring and Evaluation (M&E) specialist; Translator for ESMS Documents for Project Implementation; Senior Communication Specialist; Communication Officer; Social Media Officer; Graphic Designer. Terdapat masa kerja konsultan individu yang berakhir di periode tahun 2023. Sebagian konsultan individu melanjutkan dengan perpanjangan kontrak, sebagian lainnya telah selesai masa proyek, sebagai berikut: 1. Senior Adviser Institutional Development Specialist; 2. Institutional Development Specialist 3. Legal specialists (2 orang); 4. Social safeguard specialist; 5. Land acquisition specialist; 6. Environmental safeguard specialist; 7. Administrative staff (2 orang); 8. Project Associate 9. Program development specialist; 10. Monitoring and Evaluation (M&E) specialist; 11. Translator for ESMS Documents for Project Implementation 12. Senior Communication Specialist 13. Communication Officer 14. Social Media Officer 15. Graphic Designer Dalam rangka pengesahan BPDLH, selama tahun 2023 Proyek Hibah IEF TAP telah melakukan pengesahan melalui Surat Perintah Pengesahan Pendapatan dan Belanja BLU (SP3B BLU) dengan rincian sebagai berikut: 22 | P a g e Tabel 9. Rincian SP3B BLU Tahun 2023 SP3B BLU Tahun 2023 Nomor Tanggal Nilai (Rp.) 00013A 27 Juli 2023 633.153.809 00015A 09 Agustus 2023 905.058.891 00019A 26 Oktober 2023 2.200.233.419 00046A 31 Desember 2023 350.000.000 00047A 31 Desember 2023 852.118.857 Total 4.940.564.976 Perincian Surat Perintah Membayar (SPM) selama tahun 2023 yang disahkan sebagai berikut: Tabel 10. Daftar Pengesahan Proyek IEF TAP Tahun 2023 Nomor SPM Nilai (Rp) Keterangan Pembayaran IRIS Firma Komunikasi Remun 4 0284/SPM/439039/2023 567.493.853 bulan dan 1 booklet sesuai dengan SPR- 5/TA.WB/2023 tanggal 6 Maret 2023 Pembayaran Pekerjaan Non-reimbursable cost periode 16 Oktober - 15 November 2022 (Blueprint, website management, sosmed dll) 0286/SPM/439039/2023 122.573.381 oleh Firma Komunikasi PT Advisindo Artistika (IRIS) sesuai SPR-10/TA.WB/2023 tanggal 31 Mei 2023 Paket Pekerjaan Akomodasi Rapat (Full board meeting) Mid-term review mission the World 0287/SPM/439039/2023 35.866.800 Bank tanggal 22 Mei 2023 sesuai SPR- 12/TA.WB/2023 tanggal 15 Juni 2023 Pembayaran Remunerasi PMU TA WB time- based periode 26 Mei - 25 Juni 2023 sesuai 0288/SPM/439039/2023 179.124.857 dengan SPR nomor SPR-13/TA.WB/2023 tanggal 28 Juni 2023 Pembayaran Remunerasi Konsultan Individual time based periode 26 Desember 2022 - 25 0281/SPM/439039/2023 119.102.000 Januari 2023 sesuai dengan SPR- 1/TA.WB/2023 tanggal 28 Februari 2023 Pembayaran Remunerasi Konsultan Individual time based periode 26 Januari - 25 Februari 0282/SPM/439039/2023 227.965.905 2023 sesuai dengan SPR-3/TA.WB/2023 tanggal 31 Maret 2023 Pembayaran Remunerasi Konsultan Individual 0283/SPM/439039/2023 123.330.571 time based periode 26 Maret - 25 April 2023 tanggal 8 Mei 2023 Pembayaran Remunerasi Konsultan Individual time based periode 26 April - 25 Mei 2023 0285/SPM/439039/2023 162.755.333 sesuai dengan SPR-11/TA.WB/2023 tanggal 5 Juni 2023 Pembayaran Pekerjaan Firma Management Information System (MIS) oleh PT Pinteraktif 0446/SPM/439039/2023 998.604.387 untuk deliverables Action Plan 1. Presentation and Approved Workplan; Action 2. Modul 6 dan 12; Action 3. Modul 4,6,9,10,12 sesuai dengan 23 | P a g e Nomor SPM Nilai (Rp) Keterangan SPR nomor SPR-6/TA.WB/2023; SPR- 16/TA.WB/2023; SPR 18/TA.WB/2023 0447/SPM/439039/2023 270.000.000 Pengesahan SPR nomor SPR-2/TA.WB/2023 Pembayaran Remunerasi Konsultan Individu Senior Program Development Specialist deliverables ke-1 0448/SPM/439039/2023 63.000.000 berdasarkan SPR nomor SPR-4/TA.WB/2023 tanggal 6 Maret 2023 Pembayaran Remunerasi Konsultan Individu Senior Program Development Specialist 0449/SPM/439039/2023 147.000.000 deliverables ke-2 sesuai dengan SPR nomor SPR-23/TA.WB/2023 tanggal 15 September 2023 Pembayaran Remunerasi Konsultan Individu Time-Based Bulan Juli, Agustus dan 0450/SPM/439039/2023 524.795.047 September 2023 sesuai dengan SPR nomor SPR-15/TA.WB/2023; SPR-17/TA.WB/2023; SPR 20/TA.WB/2023; SPR-24/TA.WB/2023 Pembayaran Tiket Transportasi Konsultan Individu Time based Persiapan Penyusunan Laporan Kegiatan Project Management Unit 0451/SPM/439039/2023 16.833.985 (PMU) Semester I TA 2023 dan rencana kerja Semester II TA 2023 sesuai dengan SPR nomor SPR 22/TA.WB/2023 tanggal 10 Agustus 2023 Pembayaran Remunerasi Konsultan Individu Monitoring & Evaluation System Specialist deliverables ke 1;2;3;4 sesuai dengan SPR 0452/SPM/439039/2023 180.000.000 nomor SPR-7/TA.WB/2023; SPR- 14/TA.WB/2023; SPR-19/TA.WB/2023; SPR- 21/TA.WB/2023 Pembayaran Firma Paket Merchandise COP 28 UNFCCC sesuai dengan SPR nomor SPR- 0754/SPM/439039/2024 72.500.000 34/TA.WB/2023 SPTP nomor 11 bulan Desember 2023 Pembayaran Pekerjaan Firma Management Information System (MIS) PT Pinteraktif Media sesuai dengan SPR nomor SPR- 0755/SPM/439039/2024 150.000.000 25/TA.WB/2023 dan SPR-35/TA.WB/2023 SPTPB nomor 9 bulan Oktober 2023 dan SPTPB nomor 11 bulan Desember 2023 Pembayaran Pekerjaan Firma Management Information System (MIS) PT Pinteraktif Media sesuai dengan SPR nomor SPR- 0755/SPM/439039/2024 200.000.000 25/TA.WB/2023 dan SPR-35/TA.WB/2023 SPTPB nomor 9 bulan Oktober 2023 dan SPTPB nomor 11 bulan Desember 2023 24 | P a g e Nomor SPM Nilai (Rp) Keterangan Pembayaran Remunerasi Konsultan Individu Document Translator for ESMS Document deliverables ke-1-5 sesuai dengan SPR nomor SPR-26/TA.WB/2023; SPR-27/TA.WB/2023; 0756/SPM/439039/2024 6.000.000 SPR- 29/TA.WB/2023; SPR-30/TA.WB/2023; SPR-31/TA.WB/2023 --- SPTPB Nomor 9 Bulan Oktober; SPTPB Nomor 10 Bulan November Pembayaran Remunerasi Konsultan Individu Document Translator for ESMS Document deliverables ke-1-5 sesuai dengan SPR nomor SPR-26/TA.WB/2023; SPR-27/TA.WB/2023; 0756/SPM/439039/2024 17.100.000 SPR- 29/TA.WB/2023; SPR-30/TA.WB/2023; SPR-31/TA.WB/2023 --- SPTPB Nomor 9 Bulan Oktober; SPTPB Nomor 10 Bulan November Pembayaran Remunerasi Konsultan Individu Document Translator for ESMS Document deliverables ke-1-5 sesuai dengan SPR nomor SPR-26/TA.WB/2023; SPR-27/TA.WB/2023; 0756/SPM/439039/2024 9.450.000 SPR- 29/TA.WB/2023; SPR-30/TA.WB/2023; SPR-31/TA.WB/2023 --- SPTPB Nomor 9 Bulan Oktober; SPTPB Nomor 10 Bulan November Pembayaran Remunerasi Konsultan Individu Document Translator for ESMS Document deliverables ke-1-5 sesuai dengan SPR nomor SPR-26/TA.WB/2023; SPR-27/TA.WB/2023; 0756/SPM/439039/2024 25.500.000 SPR- 29/TA.WB/2023; SPR-30/TA.WB/2023; SPR-31/TA.WB/2023 --- SPTPB Nomor 9 Bulan Oktober; SPTPB Nomor 10 Bulan November Pembayaran Remunerasi Konsultan Individu Document Translator for ESMS Document deliverables ke-1-5 sesuai dengan SPR nomor SPR-26/TA.WB/2023; SPR-27/TA.WB/2023; 0756/SPM/439039/2024 4.150.000 SPR- 29/TA.WB/2023; SPR-30/TA.WB/2023; SPR-31/TA.WB/2023 --- SPTPB Nomor 9 Bulan Oktober; SPTPB Nomor 10 Bulan November Remunerasi Konsultan Output-based Senior Program Development Specialist deliverables 3 0757/SPM/439039/2024 126.000.000 dan 4 sesuai dengan SPR nomor SPR- 37/TA.WB/2023 dan SPR-38/TA.WB/2023 SPTPB nomor 11 bulan Desember 2023 Remunerasi Konsultan Output-based Senior Program Development Specialist deliverables 3 0757/SPM/439039/2024 84.000.000 dan 4 sesuai dengan SPR nomor SPR- 37/TA.WB/2023 dan SPR-38/TA.WB/2023 SPTPB nomor 11 bulan Desember 2023 Remunerasi Konsultan Individu Time-Based 0758/SPM/439039/2024 177.612.000 periode Oktober, November dan Desember 2023 sesuai dengan SPTJB nomor 10 bulan 25 | P a g e Nomor SPM Nilai (Rp) Keterangan November 2023 dan SPTJB nomor 11 bulan Desember 2023 Remunerasi Konsultan Individu Time-Based periode Oktober, November dan Desember 0758/SPM/439039/2024 19.062.857 2023 sesuai dengan SPTJB nomor 10 bulan November 2023 dan SPTJB nomor 11 bulan Desember 2023 Remunerasi Konsultan Individu Time-Based periode Oktober, November dan Desember 0758/SPM/439039/2024 155.372.000 2023 sesuai dengan SPTJB nomor 10 bulan November 2023 dan SPTJB nomor 11 bulan Desember 2023 Remunerasi Konsultan Individu Time-Based periode Oktober, November dan Desember 0758/SPM/439039/2024 155.372.000 2023 sesuai dengan SPTJB nomor 10 bulan November 2023 dan SPTJB nomor 11 bulan Desember 2023 Total 4.940.564.976 26 | P a g e PENUTUP Laporan keuangan tahun 2023 merupakan hasil dari proses pencatatan dan pengikhtisaran data transaksi bisnis yang digunakan sebagai alat komunikasi dengan pihak yang berkepentingan seperti pihak manajemen, pemilik, investor, penyalur, karyawan, lembaga pemerintah dan masyarakat umum. Berdasarkan dari laporan yang dijelaskan di atas, maka dapat diambil kesimpulan bahwa kegiatan IEF TAP memiliki progres yang baik walaupun belum sesuai dengan timeline dan workplan yang diagendakan. Pencairan dana dan kegiatan proyek yang direncanakan dimulai pada bulan Juni 2021, baru bisa direalisasikan pada bulan September 2021. Sehingga proses pengadaan konsultan individu baru dapat diselenggarakan pada akhir bulan September dan realisasi penggunaan dana hibah IEF TAP periode Januari – Desember 2023 tidak maksimal direalisasikan serta memiliki sisa dana. Sisa dana tersebut akan diakumulasikan dengan pengajuan pencairan dana proyek periode Januari - Juni 2024. Kegiatan IEF TAP seluruhnya menggunakan kurs Rupiah, sehingga dalam pelaksanaannya, dana hibah proyek yang masih dalam bentuk kurs USD harus dikonversikan menjadi mata uang rupiah pada saat akan diselenggarakannya kegiatan dan pembayaran. Dalam pelaksanaannya, dana IEF TAP periode Januari - Desember 2023 digunakan untuk pembayaran remunerasi konsultan individu baik time-based maupun output-based, pembayaran pengadaan paket meeting kegiatan dan biaya perjalanan capacity building BPDLH, pembayaran jasa Firma Komunikasi, pembayaran Firma MIS (Management Information System), pembayaran Paket Merchandise COP 28 UNFCCC. 27 | P a g e LAMPIRAN 28 | P a g e Lampiran 1. IFR Quarter 1 tahun 2023 IFR-1 Indonesian Environment Fund Technical Assistance Project Project Sources and Uses of Funds for the quarter ending 31 March 2023 currency: USD Actual / i Planned Variance % Current Year-To Cumulative Current Year-To Cumulative Current Year-To Cumulative Quarter /ii Date To-Date/iii Quarter /ii Date To-Date/iii Quarter /ii Date To-Date/iii 1 2 3 4 5 6 7=1/4 8=2/5 9=3/6 Sources of Funds GOI ( Counterpart) The World Bank 60.132,52 60.132,52 350.518,50 477.891,19 477.891,19 1.665.083,09 12,58 12,58 21,05 Other Donor/lender Total Sources of Fund 60.132,52 60.132,52 350.518,50 477.891,19 477.891,19 1.665.083,09 12,58 12,58 21,05 Uses of Funds (by Category) Goods, Consultant, Training & 1 Operating Cost 60.132,52 60.132,52 350.518,50 477.891,19 477.891,19 1.665.083,09 12,58 12,58 21,05 - - - - - - Non Bank Financed (Rupiah Murni) Total Uses of Fund 60.132,52 60.132,52 350.518,50 477.891,19 477.891,19 1.665.083,09 12,58 12,58 21,05 29 | P a g e Lampiran 2. IFR Quarter 2 tahun 2023 IFR-1 Indonesian Environment Fund Technical Assistance Project Project Sources and Uses of Funds for the quarter ending 30 June 2023 currency: USD Actual / i Planned Variance % Current Year-To Cumulative Current Year-To Cumulative Current Year-To Cumulative Quarter /ii Date To-Date/iii Quarter /ii Date To-Date/iii Quarter /ii Date To-Date/iii 1 2 3 4 5 6 7=1/4 8=2/5 9=3/6 Sources of Funds GOI ( Counterpart) The World Bank 40.363,40 100.495,92 390.881,80 326.485,90 804.377,08 1.991.568,98 12,36 12,49 19,63 Other Donor/lender Total Sources of Fund 40.363,40 100.495,92 390.881,80 326.485,90 804.377,08 1.991.568,98 12,36 12,49 19,63 Uses of Funds (by Category) Goods, Consultant, Training & 1 40.363,40 100.495,92 390.881,80 326.485,90 804.377,08 1.991.568,98 12,36 12,49 19,63 Operating Cost - - - - - - Non Bank Financed (Rupiah Murni) Total Uses of Fund 40.363,40 100.495,92 390.881,80 326.485,90 804.377,08 1.991.568,98 12,36 12,49 19,63 30 | P a g e Lampiran 3. IFR Quarter 3 tahun 2023 IFR-1 Indonesian Environment Fund Technical Assistance Project Project Sources and Uses of Funds for the quarter ending 30 September 2023 currency: USD Actual / i Planned Variance % Current Year-To Cumulative Current Year-To Cumulative Current Year-To Cumulative Quarter /ii Date To-Date/iii Quarter /ii Date To-Date/iii Quarter /ii Date To-Date/iii 1 2 3 4 5 6 7=1/4 8=2/5 9=3/6 Sources of Funds GOI ( Counterpart) The World Bank 146.612,05 247.107,97 537.493,85 584.486,00 721.268,00 1.011.433,02 25,08 34,26 53,14 Other Donor/lender Total Sources of Fund 146.612,05 247.107,97 537.493,85 584.486,00 721.268,00 1.011.433,02 25,08 34,26 53,14 Uses of Funds (by Category) Goods, Consultant, Training & 1 Operating Cost a. Strengthening Operational 91.775,55 143.400,73 228.715,55 527.822,00 568.090,03 655.795,24 17,39 25,24 34,88 Systems b. Project Management and 54.836,50 103.707,25 308.778,30 56.664,00 153.177,97 355.637,78 96,77 67,70 86,82 Institutional Capacity Building Total Uses of Fund 146.612,05 247.107,97 537.493,85 584.486,00 721.268,00 1.011.433,02 31 | P a g e Lampiran 4. IFR Quarter 4 tahun 2023 IFR-1 Indonesian Environment Fund Technical Assistance Project Project Sources and Uses of Funds for the quarter ending 31 December 2023 currency: USD Actual / i Planned Variance % Current Year-To Cumulative Current Year-To Cumulative Current Year-To Cumulative Quarter /ii Date To-Date/iii Quarter /ii Date To-Date/iii Quarter /ii Date To-Date/iii 1 2 3 4 5 6 7=1/4 8=2/5 9=3/6 Sources of Funds GOI ( Counterpart) The World Bank 76.746,44 323.854,41 614.240,29 86.185,00 343.319,44 1.011.433,02 89,05 94,33 60,73 Other Donor/lender Total Sources of Fund 76.746,44 323.854,41 614.240,29 86.185,00 343.319,44 1.011.433,02 89,05 94,33 60,73 Uses of Funds (by Category) Goods, Consultant, Training & 1 Operating Cost a. Strengthening Operational Systems 38.998,11 182.398,84 267.713,66 40.797,00 187.608,59 655.795,24 95,59 97,22 40,82 b. Project Management and Institutional Capacity 37.748,33 141.455,58 346.526,63 45.388,00 155.710,86 355.637,78 83,17 90,85 97,44 Building Total Uses of Fund 76.746,44 323.854,41 614.240,29 86.185,00 343.319,44 1.011.433,02 32 | P a g e Lampiran 5. Summary Statement of Expenditures Quarter 1 tahun 2023 1-C2 Indonesian Environment Fund Technical Assistance Project Summary Statement of Expenditure for those NOT Subject to Prior Review For Quarter Ended 31 March 2023 Ln/Cr/TF No. Sheet No. 1 2 3b 4 5 6 7 8 9 10 11 Item Disbursement Category Ref Date of Contract Supplier/ Contract Total Amount WB Exchange Amount Finan No. No. Payment No. Contractor Value Paid to cing Rate Charged Cat Description and Date Name (incl. Add) Contractor % Applied to SA No. Remun Admin staff 0281/SPM/4390 SPK-1/TA.WB/2022 Fadhilatunnisa 1 1 January 2023 02-Feb-23 Rp103.200.000 Rp8.600.000 100 Rp14.971 USD 574,44 39/2023 20-Sep-22 Nurhadiza Remun Admin staff 0281/SPM/4390 SPK-2/TA.WB/2022 2 1 January 2023 02-Feb-23 Ahmad Fatoni Rp103.200.000 Rp8.600.000 100 Rp14.971 USD 574,44 39/2023 28-Sep-22 Remun Legal Specialist 0281/SPM/4390 SPK-3/TA.WB/2022 3 1 January 2023 02-Feb-23 Rini Setianingsih Rp330.420.000 Rp27.535.000 100 Rp14.971 USD 1.839,22 39/2023 9-Okt-22 Remun Legal Specialist 0281/SPM/4390 SPK-4/TA.WB/2022 4 1 January 2023 02-Feb-23 Hans Pribadi Rp317.484.000 Rp26.457.000 100 Rp14.971 USD 1.767,22 39/2023 19-Okt-22 Remun Environmental Safeguard Specialist 0281/SPM/4390 SPK-8/TA.WB/2022 5 1 02-Feb-23 Putri Yasmin Rp308.040.000 Rp25.670.000 100 Rp14.971 USD 1.714,65 January 2023 39/2023 30-Nov-21 Remun Institutional Development Specialist 0281/SPM/4390 SPK-7/TA.WB/2022 Eri Indrawan 6 1 January 2023 02-Feb-23 Rp266.880.000 Rp22.240.000 100 Rp14.971 USD 1.485,54 39/2023 14-Nov-22 Wiradikoesoema Remun Admin staff 0282/SPM/4390 SPK-1/TA.WB/2022 Fadhilatunnisa 7 1 February 2023 01-Mar-23 Rp103.200.000 Rp8.600.000 100 Rp15.196 USD 565,94 39/2023 20-Sep-22 Nurhadiza Remun Admin staff 0282/SPM/4390 SPK-2/TA.WB/2022 8 1 February 2023 01-Mar-23 Ahmad Fatoni Rp103.200.000 Rp6.961.905 100 Rp15.196 USD 458,14 39/2023 28-Sep-22 Remun Legal Specialist 0282/SPM/4390 SPK-3/TA.WB/2022 9 1 February 2023 01-Mar-23 Rini Setianingsih Rp330.420.000 Rp27.535.000 100 Rp15.196 USD 1.811,99 39/2023 9-Okt-22 33 | P a g e Remun Legal Specialist 0282/SPM/4390 SPK-4/TA.WB/2022 10 1 February 2023 01-Mar-23 Hans Pribadi Rp317.484.000 Rp26.457.000 100 Rp15.196 USD 1.741,05 39/2023 19-Okt-22 Remun Environmental Safeguard Specialist 0282/SPM/4390 SPK-8/TA.WB/2022 11 1 01-Mar-23 Putri Yasmin Rp308.040.000 Rp25.670.000 100 Rp15.196 USD 1.689,26 February 2023 39/2023 30-Nov-21 Remun Institutional Development Specialist 0282/SPM/4390 SPK-7/TA.WB/2022 Eri Indrawan 12 1 01-Mar-23 Rp266.880.000 Rp22.240.000 100 Rp15.196 USD 1.463,54 February 2023 39/2023 14-Nov-22 Wiradikoesoema Communication Firm: Opinion Editorial Booklet Profile and non- reimbursable cost period of 16 July - 15 September 018/WB- 0284/SPM/4390 PT Advisindo 13 1 2022 (communication 02-Mar-23 IEF/PROC/SC/VI/2022 Rp6.840.229.000 Rp567.493.853 100 Rp15.254 USD 37.202,95 39/2023 Artistika (IRIS) buleprint, website 15-Jun-22 management, development comms team guideline) Remun Admin staff January 2023 0282/SPM/4390 SPK-1/TA.WB/2022 Fadhilatunnisa 14 1 31-Mar-23 Rp103.200.000 Rp8.600.000 100 Rp15.254 USD 563,79 39/2023 20-Sep-22 Nurhadiza Remun Legal Specialist January 2023 0282/SPM/4390 SPK-3/TA.WB/2022 15 1 31-Mar-23 Rini Setianingsih Rp330.420.000 Rp27.535.000 100 Rp15.254 USD 1.805,10 39/2023 9-Okt-22 Remun Legal Specialist 0282/SPM/4390 SPK-4/TA.WB/2022 16 1 January 2023 31-Mar-23 Hans Pribadi Rp317.484.000 Rp26.457.000 100 Rp15.254 USD 1.734,43 39/2023 19-Okt-22 Remun Environmental 0282/SPM/4390 SPK-8/TA.WB/2022 17 1 Safeguard Specialist 31-Mar-23 Putri Yasmin Rp308.040.000 Rp25.670.000 100 Rp15.254 USD 1.682,84 39/2023 30-Nov-21 January 2023 Remun Institutional 0282/SPM/4390 SPK-7/TA.WB/2022 Eri Indrawan 18 1 Development Specialist 31-Mar-23 Rp266.880.000 Rp22.240.000 100 Rp15.254 USD 1.457,98 39/2023 14-Nov-22 Wiradikoesoema January 2023 GRAND TOTAL Rp914.561.758 USD 60.132,52 34 | P a g e Lampiran 6. Summary Statement of Expenditures Quarter 2 tahun 2023 1-C2 Indonesian Environment Fund Technical Assistance Project Summary Statement of Expenditure for those NOT Subject to Prior Review For Quarter Ended 30 June 2023 Ln/Cr/TF No. Sheet No. 1 2 3b 4 5 6 7 8 9 10 11 Item Disbursement Category Ref Date of Contract Supplier/ Contract Total Amount WB Exchange Amount No. No. Payment No. Contractor Value Paid to Financing Rate Charged Cat Description and Date Name (incl. Add) Contractor % Applied to SA No. SPK-1/TA.WB/2022 Fadhilatunnisa 1 1 Remun Admin staff April 2023 0283/SPM/439039/2023 28-Apr-23 Rp103.200.000 Rp2.047.619 100 Rp14.835 USD 138,03 20-Sep-22 Nurhadiza Remun Legal Specialist April SPK-3/TA.WB/2022 2 1 2023 0283/SPM/439039/2023 28-Apr-23 Rini Setianingsih Rp330.420.000 Rp27.535.000 100 Rp14.835 USD 1.856,08 9-Okt-22 Remun Legal Specialist April SPK-4/TA.WB/2022 3 1 2023 0283/SPM/439039/2023 28-Apr-23 Hans Pribadi Rp317.484.000 Rp26.457.000 100 Rp14.835 USD 1.783,42 19-Okt-22 Remun Environmental SPK-8/TA.WB/2022 4 1 Safeguard Specialist April 0283/SPM/439039/2023 28-Apr-23 Putri Yasmin Rp308.040.000 Rp25.670.000 100 Rp14.835 USD 1.730,37 30-Nov-21 2023 Remun Institutional Development Specialist April SPK-7/TA.WB/2022 Eri Indrawan 5 1 2023 0283/SPM/439039/2023 28-Apr-23 Rp266.880.000 Rp22.240.000 100 Rp14.835 USD 1.499,16 14-Nov-22 Wiradikoesoema Remun Project Associate April 2023 SPK-14/TA.WB/2022 Fadhilatunnisa 6 1 0283/SPM/439039/2023 28-Apr-23 Rp150.000.000 Rp12.142.857 100 Rp14.835 USD 818,53 3-Apr-23 Nurhadiza Remun Communication Officer April 2023 SPK-17/TA.WB/2022 Farrah Audina 7 1 0283/SPM/439039/2023 28-Apr-23 Rp152.000.000 Rp7.238.095 100 Rp14.835 USD 487,91 12-Apr-23 Fathya 35 | P a g e Communication Firm: Non- reimbursable cost period of 16 Oct - 15 Nov 2022 018/WB- PT Advisindo 8 1 (communication buleprint, 0286/SPM/439039/2023 23-May-23 IEF/PROC/SC/VI/2022 Rp6.840.229.000 Rp122.573.381 100 Rp14.792 USD 8.286,46 Artistika (IRIS) website management, 15-Jun-22 development comms team guideline) Remun Legal Specialist May SPK-3/TA.WB/2022 9 1 0285/SPM/439039/2023 31-May-23 Rini Setianingsih Rp330.420.000 Rp27.535.000 100 Rp14.792 USD 1.861,48 2023 9-Okt-22 Remun Legal Specialist May SPK-4/TA.WB/2022 10 1 0285/SPM/439039/2023 31-May-23 Hans Pribadi Rp317.484.000 Rp26.457.000 100 Rp14.792 USD 1.788,60 2023 19-Okt-22 Remun Environmental Safeguard Specialist May SPK-8/TA.WB/2022 11 1 0285/SPM/439039/2023 31-May-23 Putri Yasmin Rp308.040.000 Rp25.670.000 100 Rp14.792 USD 1.735,40 2023 30-Nov-21 Remun Institutional Development Specialist May SPK-7/TA.WB/2022 Eri Indrawan 12 1 0285/SPM/439039/2023 31-May-23 Rp266.880.000 Rp22.240.000 100 Rp14.792 USD 1.503,52 2023 14-Nov-22 Wiradikoesoema Remun Project Associate May 2023 SPK-14/TA.WB/2022 Fadhilatunnisa 13 1 0285/SPM/439039/2023 31-May-23 Rp150.000.000 Rp15.000.000 100 Rp14.792 USD 1.014,06 3-Apr-23 Nurhadiza Remun Communication Officer May 2023 SPK-17/TA.WB/2022 Farrah Audina 14 1 0285/SPM/439039/2023 31-May-23 Rp152.000.000 Rp15.200.000 100 Rp14.792 USD 1.027,58 12-Apr-23 Fathya Remun Senior Communication Specialist SPK-18/TA.WB/2022 Rishi Andika 15 1 0285/SPM/439039/2023 31-May-23 Rp241.000.000 Rp21.804.762 100 Rp14.792 USD 1.474,09 May 2023 1-May-23 Yudha Remun Graphic Designer May 2023 SPK-19/TA.WB/2022 Dicky Putra 16 1 0285/SPM/439039/2023 31-May-23 Rp97.800.000 Rp8.848.571 100 Rp14.792 USD 598,20 1-May-23 Sadewa PT Nurtirta Nusa Meeting package payment: Lestari 17 1 0287/SPM/439039/2023 14-Jun-23 Rp219.000.000 Rp35.866.800 100 Rp14.949 USD 2.399,28 mid-term review mission (DoubleTree Hotel Cikini) Remun Legal Specialist June 2023 SPK-3/TA.WB/2022 18 1 0288/SPM/439039/2023 27-Jun-23 Rini Setianingsih Rp330.420.000 Rp27.535.000 100 Rp14.962 USD 1.840,33 9-Okt-22 Remun Legal Specialist June 2023 SPK-4/TA.WB/2022 19 1 0288/SPM/439039/2023 27-Jun-23 Hans Pribadi Rp317.484.000 Rp26.457.000 100 Rp14.962 USD 1.768,28 19-Okt-22 36 | P a g e Remun Environmental Safeguard Specialist June SPK-8/TA.WB/2022 20 1 2023 0288/SPM/439039/2023 27-Jun-23 Putri Yasmin Rp308.040.000 Rp25.670.000 100 Rp14.962 USD 1.715,68 30-Nov-21 Remun Institutional Development Specialist June SPK-7/TA.WB/2022 Eri Indrawan 21 1 2023 0288/SPM/439039/2023 27-Jun-23 Rp266.880.000 Rp22.240.000 100 Rp14.962 USD 1.486,43 14-Nov-22 Wiradikoesoema Remun Project Associate June 2023 SPK-14/TA.WB/2022 Fadhilatunnisa 22 1 0288/SPM/439039/2023 27-Jun-23 Rp150.000.000 Rp15.000.000 100 Rp14.962 USD 1.002,54 3-Apr-23 Nurhadiza Remun Communication Officer June 2023 SPK-17/TA.WB/2022 Farrah Audina 23 1 0288/SPM/439039/2023 27-Jun-23 Rp152.000.000 Rp15.200.000 100 Rp14.962 USD 1.015,91 12-Apr-23 Fathya Remun Graphic Designer June 2023 SPK-19/TA.WB/2022 Dicky Putra 24 1 0288/SPM/439039/2023 27-Jun-23 Rp97.800.000 Rp9.780.000 100 Rp14.962 USD 653,66 1-May-23 Sadewa Remun Social Media Officer 0288/SPM/439039/2023 June 2023 SPK-20/TA.WB/2022 25 1 27-Jun-23 Anniza Djunaid Rp138.000.000 Rp13.142.857 100 Rp14.962 USD 878,42 29-May-23 GRAND TOTAL Rp599.550.942 USD 40.363,40 37 | P a g e Lampiran 7. Summary Statement of Expenditures Quarter 3 tahun 2023 1-C2 Indonesian Environment Fund Technical Assistance Project Summary Statement of Expenditure for those NOT Subject to Prior Review For Quarter Ended 30 September 2023 Ln/Cr/TF No. Sheet No. 1 2 3b 4 5 6 7 8 9 10 11 Item Disbursement Category Ref Date of Contract Supplier/ Contract Total Amount WB Exchange Amount Financin No. No. Payment No. Contractor Value Paid to Rate Charged g Cat Description and Date Name (incl. Add) Contractor % Applied to SA No. Component 1. : Strengthening Operational Systems MIS Firm: Action 1. Presentation SPK-6/TA.WB/2022 PT Pinteraktif 1 1 0446/SPM/439039/2023 01-Mar-23 Rp7.932.087.750 Rp396.604.387 100 Rp15.196 USD 26.099,26 and Approved Workplan (5%) 14-Nov-22 Media SPK- Remun M&E System Specialist 2 1 0452/SPM/439039/2023 13-Mar-23 10/TA.WB/2022 Fauzan Saifullah Rp180.000.000 Rp27.000.000 100 Rp15.254 USD 1.770,03 deliverable 1 26-Jan-23 SPK- Remun M&E System Specialist 3 1 0452/SPM/439039/2023 27-Jun-23 10/TA.WB/2022 Fauzan Saifullah Rp180.000.000 Rp45.000.000 100 Rp14.962 USD 3.007,62 deliverable 2 26-Jan-23 SPK- Remun Senior Communication Rishi Andika 4 1 0288/SPM/439039/2023 03-Jul-23 18/TA.WB/2022 Rp241.000.000 Rp24.100.000 100 Rp14.962 USD 1.610,75 Specialist June 2023 Yudha 1-May-23 SPK- Remun Communication Officer Farrah Audina 5 1 0450/SPM/439039/2023 01-Aug-23 17/TA.WB/2022 Rp152.000.000 Rp15.200.000 100 Rp15.072 USD 1.008,49 July 2023 Fathya 12-Apr-23 SPK- Remun Senior Communication Rishi Andika 6 1 0450/SPM/439039/2023 01-Aug-23 18/TA.WB/2022 Rp241.000.000 Rp24.100.000 100 Rp15.072 USD 1.598,99 Specialist July 2023 Yudha 1-May-23 SPK- Remun Graphic Designer July Dicky Putra 7 1 0450/SPM/439039/2023 01-Aug-23 19/TA.WB/2022 Rp97.800.000 Rp9.780.000 100 Rp15.072 USD 648,89 2023 Sadewa 1-May-23 SPK- Remun Social Media Officer July 8 1 0450/SPM/439039/2023 01-Aug-23 20/TA.WB/2022 Anniza Djunaid Rp138.000.000 Rp13.800.000 100 Rp15.072 USD 915,61 2023 29-May-23 MIS Firm: Action 2. Modul 6 and SPK-6/TA.WB/2022 PT Pinteraktif 9 1 0446/SPM/439039/2023 01-Aug-23 Rp7.932.087.750 Rp350.000.000 100 Rp15.072 USD 23.221,87 12 14-Nov-22 Media 38 | P a g e SPK- Remun M&E System Specialist 10 1 0452/SPM/439039/2023 25-Aug-23 10/TA.WB/2022 Fauzan Saifullah Rp180.000.000 Rp54.000.000 100 Rp15.193 USD 3.554,27 deliverable 3 26-Jan-23 MIS Firm: Action 3. Modul 4, 5, SPK-6/TA.WB/2022 PT Pinteraktif 11 1 0446/SPM/439039/2023 25-Aug-23 Rp7.932.087.750 Rp252.000.000 100 Rp15.193 USD 16.586,59 6, 9, 10, 12 14-Nov-22 Media SPK- Remun M&E System Specialist 12 1 0452/SPM/439039/2023 31-Aug-23 10/TA.WB/2022 Fauzan Saifullah Rp180.000.000 Rp54.000.000 100 Rp15.193 USD 3.554,27 deliverable 4 26-Jan-23 SPK- Remun Communication Officer Farrah Audina 13 1 0450/SPM/439039/2023 31-Aug-23 17/TA.WB/2022 Rp152.000.000 Rp15.200.000 100 Rp15.193 USD 1.000,46 August 2023 Fathya 12-Apr-23 SPK- Remun Senior Communication Rishi Andika 14 1 0450/SPM/439039/2023 31-Aug-23 18/TA.WB/2022 Rp241.000.000 Rp24.100.000 100 Rp15.193 USD 1.586,26 Specialist August 2023 Yudha 1-May-23 SPK- Remun Graphic Designer August Dicky Putra 15 1 0450/SPM/439039/2023 31-Aug-23 19/TA.WB/2022 Rp97.800.000 Rp9.780.000 100 Rp15.193 USD 643,72 2023 Sadewa 1-May-23 SPK- Remun Social Media Officer 16 1 0450/SPM/439039/2023 31-Aug-23 20/TA.WB/2022 Anniza Djunaid Rp138.000.000 Rp13.800.000 100 Rp15.193 USD 908,31 August 2023 29-May-23 SPK- Remun Communication Officer Farrah Audina 17 1 0450/SPM/439039/2023 29-Sep-23 17/TA.WB/2022 Rp152.000.000 Rp15.200.000 100 Rp15.487 USD 981,47 September 2023 Fathya 12-Apr-23 SPK- Remun Senior Communication Rishi Andika 18 1 0450/SPM/439039/2023 29-Sep-23 18/TA.WB/2022 Rp241.000.000 Rp24.100.000 100 Rp15.487 USD 1.556,14 Specialist September 2023 Yudha 1-May-23 SPK- Remun Graphic Designer Dicky Putra 19 1 0450/SPM/439039/2023 29-Sep-23 19/TA.WB/2022 Rp97.800.000 Rp9.780.000 100 Rp15.487 USD 631,50 September 2023 Sadewa 1-May-23 SPK- Remun Social Media Officer 20 1 0450/SPM/439039/2023 29-Sep-23 20/TA.WB/2022 Anniza Djunaid Rp138.000.000 Rp13.800.000 100 Rp15.487 USD 891,07 September 2023 29-May-23 Sub Total Componen 1 Rp1.391.344.387 USD 91.775,55 Component 2: Project Management and Institutional Capacity Building Remun Senior Adviser - SPK-5/TA.WB/2022 Sarwono 1 1 Institutional Development 0447/SPM/439039/2023 27-Feb-23 Rp900.000.000 Rp270.000.000 100 Rp14.971 USD 18.034,87 13-Okt-22 Kusumaatmadja deliverable 1 Remun Senior Program SPK-9/TA.WB/2022 2 1 Development Specialist 0448/SPM/439039/2023 01-Mar-23 Dian Afriyanie Rp420.000.000 Rp63.000.000 100 Rp15.196 USD 4.145,83 25-Jan-23 deliverable 1 Remun Legal Specialist July SPK-3/TA.WB/2022 3 1 0450/SPM/439039/2023 01-Aug-23 Rini Setianingsih Rp330.420.000 Rp27.535.000 100 Rp15.072 USD 1.826,90 2023 9-Okt-22 Remun Legal Specialist July SPK-4/TA.WB/2022 4 1 0450/SPM/439039/2023 01-Aug-23 Hans Pribadi Rp317.484.000 Rp26.457.000 100 Rp15.072 USD 1.755,37 2023 19-Okt-22 39 | P a g e Remun Environmental Safeguard SPK-8/TA.WB/2022 5 1 0450/SPM/439039/2023 01-Aug-23 Putri Yasmin Rp308.040.000 Rp25.670.000 100 Rp15.072 USD 1.703,16 Specialist July 2023 02-Dec-22 Remun Institutional Development SPK-7/TA.WB/2022 Eri Indrawan 6 1 0450/SPM/439039/2023 01-Aug-23 Rp266.880.000 Rp22.240.000 100 Rp15.072 USD 1.475,58 Specialist July 2023 14-Nov-22 Wiradikoesoema SPK- Remun Project Associate July Fadhilatunnisa 7 1 0450/SPM/439039/2023 01-Aug-23 14/TA.WB/2022 Rp150.000.000 Rp15.000.000 100 Rp15.072 USD 995,22 2023 Nurhadiza 3-Apr-23 SPK- Remun Project Associate 26 July Fadhilatunnisa 8 1 0450/SPM/439039/2023 08-Aug-23 14/TA.WB/2022 Rp150.000.000 Rp5.714.286 100 Rp15.193 USD 376,11 - 07 August 2023 (pro-rate) Nurhadiza 3-Apr-23 PT Altorina Wijaya; Dian Transportation Tickets for Afriyanie; Farrah 9 1 Capacity Building Individual 0451/SPM/439039/2023 08-Aug-23 Audina Fathya; Rp29.022.000 Rp16.833.985 100 Rp15.193 USD 1.108,01 Consultant TA-WB Putri Yasmin Nurul Fajri; Rini Setianingsih Remun Legal Specialist August SPK-3/TA.WB/2022 10 1 0450/SPM/439039/2023 31-Aug-23 Rini Setianingsih Rp330.420.000 Rp27.535.000 100 Rp15.193 USD 1.812,35 2023 9-Okt-22 Remun Legal Specialist August SPK-4/TA.WB/2022 11 1 0450/SPM/439039/2023 31-Aug-23 Hans Pribadi Rp317.484.000 Rp26.457.000 100 Rp15.193 USD 1.741,39 2023 19-Okt-22 Remun Environmental Safeguard SPK-8/TA.WB/2022 12 1 0450/SPM/439039/2023 31-Aug-23 Putri Yasmin Rp308.040.000 Rp25.670.000 100 Rp15.193 USD 1.689,59 Specialist August 2023 02-Dec-22 Remun Institutional Development SPK-7/TA.WB/2022 Eri Indrawan 13 1 0450/SPM/439039/2023 31-Aug-23 Rp266.880.000 Rp22.240.000 100 Rp15.193 USD 1.463,83 Specialist August 2023 14-Nov-22 Wiradikoesoema Remun Project Associate August SPK- Alban Rizki 14 1 2023 (pro-rate 14 August - 25 0450/SPM/439039/2023 31-Aug-23 21/TA.WB/2022 Rp67.500.000 Rp6.428.571 100 Rp15.193 USD 423,13 Prawara August) 14-Aug-23 Remun Senior Program SPK-9/TA.WB/2022 15 1 Development Specialist 0449/SPM/439039/2023 08-Sep-23 Dian Afriyanie Rp420.000.000 Rp147.000.000 100 Rp15.487 USD 9.491,83 25-Jan-23 deliverable 2 Remun Legal Specialist SPK-3/TA.WB/2022 16 1 0450/SPM/439039/2023 29-Sep-23 Rini Setianingsih Rp330.420.000 Rp27.535.000 100 Rp15.487 USD 1.777,94 September 2023 9-Okt-22 Remun Legal Specialist SPK-4/TA.WB/2022 17 1 0450/SPM/439039/2023 29-Sep-23 Hans Pribadi Rp317.484.000 Rp26.457.000 100 Rp15.487 USD 1.708,34 September 2023 19-Okt-22 Remun Environmental Safeguard SPK- Specialist September 2023 (pro- Fransz Semuel 18 1 0450/SPM/439039/2023 29-Sep-23 23/TA.WB/2023 Rp100.000.000 Rp15.476.190 100 Rp15.487 USD 999,30 rate 07 September - 25 Siahaya 07-Sept-23 September 2023) Remun Institutional Development SPK-7/TA.WB/2022 Eri Indrawan 19 1 0450/SPM/439039/2023 29-Sep-23 Rp266.880.000 Rp22.240.000 100 Rp15.487 USD 1.436,04 Specialist September 2023 14-Nov-22 Wiradikoesoema SPK- Remun Project Associate Alban Rizki 20 1 0450/SPM/439039/2023 29-Sep-23 21/TA.WB/2022 Rp67.500.000 Rp13.500.000 100 Rp15.487 USD 871,70 September 2023 Prawara 14-Aug-23 Sub Total Componen 2 Rp832.989.032 USD 54.836,50 GRAND TOTAL Rp2.224.333.419 USD 146.612,05 40 | P a g e Lampiran 8. Summary Statement of Expenditures Quarter 4 tahun 2023 1-C2 Indonesian Environment Fund Technical Assistance Project Summary Statement of Expenditure for those NOT Subject to Prior Review For Quarter Ended 31 December 2023 Ln/Cr/TF No. Sheet No. 1 2 3b 4 5 6 7 8 9 10 11 Item Disbursement Category Ref Date of Contract Supplier/ Contract Total Amount WB Exchange Amount No. No. Payment No. Contractor Value Paid to Financing Rate Charged Cat Description and Date Name (incl. Add) Contractor % Applied to SA No. Component 1. : Strengthening Operational Systems MIS Firm: Action 2. Modul 3, 9, 05-Oct- SPK-6/TA.WB/2022 PT Pinteraktif 1 1 0755/SPM/439039/2024 Rp7.932.087.750 Rp200.000.000 100 Rp15.714 USD 12.727,50 13 23 14-Nov-22 Media Remun Communication Officer 01-Nov- SPK-17/TA.WB/2022 Farrah Audina 2 1 0758/SPM/439039/2024 Rp152.000.000 Rp15.200.000 100 Rp15.679 USD 969,45 October 2023 23 12-Apr-23 Fathya Remun Graphic Designer 01-Nov- SPK-19/TA.WB/2022 Dicky Putra 3 1 0758/SPM/439039/2024 Rp97.800.000 Rp9.780.000 100 Rp15.679 USD 623,76 October 2023 23 1-May-23 Sadewa Remun Senior Communication 01-Nov- SPK-18/TA.WB/2022 Rishi Andika 4 1 0758/SPM/439039/2024 Rp241.000.000 Rp24.100.000 100 Rp15.679 USD 1.537,09 Specialist October 2023 23 1-May-23 Yudha Remun Social Media Officer 01-Nov- SPK-20/TA.WB/2022 5 1 0758/SPM/439039/2024 Anniza Djunaid Rp138.000.000 Rp13.800.000 100 Rp15.679 USD 880,16 October 2023 23 29-May-23 Remun Communication Officer 01-Dec- SPK-17/TA.WB/2022 Farrah Audina 6 1 0758/SPM/439039/2024 Rp152.000.000 Rp15.200.000 100 Rp15.645 USD 971,56 November 2023 23 12-Apr-23 Fathya Remun Senior Communication 01-Dec- SPK-18/TA.WB/2022 Rishi Andika 7 1 0758/SPM/439039/2024 Rp241.000.000 Rp24.100.000 100 Rp15.645 USD 1.540,43 Specialist November 2023 23 1-May-23 Yudha Remun Social Media Officer 01-Dec- SPK-20/TA.WB/2022 8 1 0758/SPM/439039/2024 Anniza Djunaid Rp138.000.000 Rp13.800.000 100 Rp15.645 USD 882,07 November 2023 23 29-May-23 Remun Graphic Designer 01-Dec- SPK-19/TA.WB/2022 Dicky Putra 9 1 0758/SPM/439039/2024 Rp97.800.000 Rp9.780.000 100 Rp15.645 USD 625,12 November 2023 23 1-May-23 Sadewa SPK-6/TA.WB/2022 MIS Firm: Action 2. Modul 4, 5, 20-Dec- 14-Nov-22 dan SPK- PT Pinteraktif 10 1 0755/SPM/439039/2024 Rp7.932.087.750 Rp150.000.000 100 Rp15.645 USD 9.587,73 11 23 26/TA.WB/2023 10- Media Nov-23 Remuneration of Merchandise 20-Dec- SPK-01/TA.WB- PT Gemah 11 1 0754/SPM/439039/2024 Rp72.500.000 Rp72.500.000 100 Rp15.645 USD 4.634,07 Package COP 28 UNFCCC 23 BJ/2023 14-Nov-23 Ripah Kreatif 41 | P a g e Remun Communication Officer 28-Dec- SPK-17/TA.WB/2022 Farrah Audina 12 1 0758/SPM/439039/2024 Rp152.000.000 Rp15.200.000 100 Rp15.645 USD 971,56 December 2023 23 12-Apr-23 Fathya Remun Senior Communication 28-Dec- SPK-18/TA.WB/2022 Rishi Andika 13 1 0758/SPM/439039/2024 Rp241.000.000 Rp24.100.000 100 Rp15.645 USD 1.540,43 Specialist December 2023 23 1-May-23 Yudha Remun Social Media Officer 28-Dec- SPK-20/TA.WB/2022 14 1 0758/SPM/439039/2024 Anniza Djunaid Rp138.000.000 Rp13.800.000 100 Rp15.645 USD 882,07 December 2023 23 29-May-23 Remun Graphic Designer 28-Dec- SPK-19/TA.WB/2022 Dicky Putra 15 1 0758/SPM/439039/2024 Rp97.800.000 Rp9.780.000 100 Rp15.645 USD 625,12 December 2023 23 1-May-23 Sadewa Sub Total Componen 1 Rp611.140.000 USD 38.998,11 Component 2: Project Management and Institutional Capacity Building Remun Translator for ESMS 26-Oct- SPK-22/TA.WB/2023 1 1 Documents for Project 0756/SPM/439039/2024 Ardina Purbo Rp100.000.000 Rp4.150.000 100 Rp15.714 USD 264,10 23 21-Aug-23 Implementation deliverable 1 Remun Translator for ESMS 26-Oct- SPK-22/TA.WB/2023 2 1 Documents for Project 0756/SPM/439039/2024 Ardina Purbo Rp100.000.000 Rp6.000.000 100 Rp15.714 USD 381,83 23 21-Aug-23 Implementation deliverable 2 Remun Project Associate 01-Nov- SPK-21/TA.WB/2022 Alban Rizki 3 1 0758/SPM/439039/2024 Rp67.500.000 Rp13.500.000 100 Rp15.679 USD 861,02 October 2023 23 14-Aug-23 Prawara SPK-4/TA.WB/2022 Remun Legal Specialist October 01-Nov- 19-Okt-22 dan SPK- 4 1 0758/SPM/439039/2024 Hans Pribadi Rp396.855.000 Rp26.457.000 100 Rp15.679 USD 1.687,42 2023 23 25/TA.WB/2023 5-Okt- 23 Remun Environmental Safeguard 01-Nov- SPK-23/TA.WB/2023 Fransz Semuel 5 1 0758/SPM/439039/2024 Rp100.000.000 Rp25.000.000 100 Rp15.679 USD 1.594,49 Specialist October 2023 23 07-Sept-23 Siahaya SPK-3/TA.WB/2022 9- Remun Legal Specialist October 01-Nov- Okt-22 dan SPK- 6 1 0758/SPM/439039/2024 Rini Setianingsih Rp330.420.000 Rp27.535.000 100 Rp15.679 USD 1.756,17 2023 23 24/TA.WB/2023 5-Okt- 23 Remun Institutional Development 01-Nov- SPK-7/TA.WB/2022 Eri Indrawan 7 1 0758/SPM/439039/2024 Rp266.880.000 Rp22.240.000 100 Rp15.679 USD 1.418,46 Specialist October 2023 23 14-Nov-22 Wiradikoesoema Remun Translator for ESMS 14-Nov- SPK-22/TA.WB/2023 8 1 Documents for Project 0756/SPM/439039/2024 Ardina Purbo Rp100.000.000 Rp17.100.000 100 Rp15.679 USD 1.090,63 23 21-Aug-23 Implementation deliverable 3 Remun Translator for ESMS 14-Nov- SPK-22/TA.WB/2023 9 1 Documents for Project 0756/SPM/439039/2024 Ardina Purbo Rp100.000.000 Rp9.450.000 100 Rp15.679 USD 602,72 23 21-Aug-23 Implementation deliverable 4 Remun Translator for ESMS 14-Nov- SPK-22/TA.WB/2023 10 1 Documents for Project 0756/SPM/439039/2024 Ardina Purbo Rp100.000.000 Rp25.500.000 100 Rp15.679 USD 1.626,38 23 21-Aug-23 Implementation deliverable 5 Remun Institutional Development 01-Dec- SPK-7/TA.WB/2022 Eri Indrawan 11 1 0758/SPM/439039/2024 Rp266.880.000 Rp19.062.857 100 Rp15.645 USD 1.218,46 Specialist November 2023 23 14-Nov-22 Wiradikoesoema Remun Environmental Safeguard 01-Dec- SPK-23/TA.WB/2023 Fransz Semuel 12 1 0758/SPM/439039/2024 Rp100.000.000 Rp25.000.000 100 Rp15.645 USD 1.597,95 Specialist November 2023 23 07-Sept-23 Siahaya 42 | P a g e Remun Project Associate 01-Dec- SPK-21/TA.WB/2022 Alban Rizki 13 1 0758/SPM/439039/2024 Rp67.500.000 Rp13.500.000 100 Rp15.645 USD 862,90 November 2023 23 14-Aug-23 Prawara SPK-4/TA.WB/2022 Remun Legal Specialist 01-Dec- 19-Okt-22 dan SPK- 14 1 0758/SPM/439039/2024 Hans Pribadi Rp396.855.000 Rp26.457.000 100 Rp15.645 USD 1.691,08 November 2023 23 25/TA.WB/2023 5-Okt- 23 SPK-3/TA.WB/2022 9- Remun Legal Specialist 01-Dec- Okt-22 dan SPK- 15 1 0758/SPM/439039/2024 Rini Setianingsih Rp330.420.000 Rp27.535.000 100 Rp15.645 USD 1.759,99 November 2023 23 24/TA.WB/2023 5-Okt- 23 SPK-4/TA.WB/2022 Remun Legal Specialist 28-Dec- 19-Okt-22 dan SPK- 16 1 0758/SPM/439039/2024 Hans Pribadi Rp396.855.000 Rp26.457.000 100 Rp15.645 USD 1.691,08 December 2023 23 25/TA.WB/2023 5-Okt- 23 SPK-3/TA.WB/2022 9- Remun Legal Specialist 28-Dec- Okt-22 dan SPK- 17 1 0758/SPM/439039/2024 Rini Setianingsih Rp330.420.000 Rp27.535.000 100 Rp15.645 USD 1.759,99 December 2023 23 24/TA.WB/2023 5-Okt- 23 Remun Environmental Safeguard 28-Dec- SPK-23/TA.WB/2023 Fransz Semuel 18 1 0758/SPM/439039/2024 Rp100.000.000 Rp25.000.000 100 Rp15.645 USD 1.597,95 Specialist December 2023 23 07-Sept-23 Siahaya Remun Project Associate 28-Dec- SPK-21/TA.WB/2022 Alban Rizki 19 1 0758/SPM/439039/2024 Rp67.500.000 Rp13.500.000 100 Rp15.645 USD 862,90 December 2023 23 14-Aug-23 Prawara Remun Senior Program 29-Dec- SPK-9/TA.WB/2022 20 1 Development Specialist 0757/SPM/439039/2024 Dian Afriyanie Rp420.000.000 Rp126.000.000 100 Rp15.645 USD 8.053,69 23 25-Jan-23 deliverable 3 Remun Senior Program 29-Dec- SPK-9/TA.WB/2022 21 1 Development Specialist 0757/SPM/439039/2024 Dian Afriyanie Rp420.000.000 Rp84.000.000 100 Rp15.645 USD 5.369,13 23 25-Jan-23 deliverable 4 Sub Total Componen 2 Rp590.978.857 USD 37.748,33 GRAND TOTAL Rp1.202.118.857 USD 76.746,44 43 | P a g e