P177646 PPSD PPSD will be uploaded when ready PROCUREMENT Comoros : Comoros Solar Energy Access Project PLAN General Information Country: Comoros 2022-10-10 Bank’s Approval Date of the Original Procurement Plan: 2024-09-09 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P177646 GPN Date: Project Name: Comoros Solar Energy Access Project Loan / Credit No: IDA / 71290, IDA / E0490 AEP SOLAR SONELEC Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned KM-AEP SONELEC-362622-C Demande d'offres Component 3. Technical Assi W-RFB / Réhabilitation du bât Single Stage - One E - DTPM Petits trav 2025-02-1 IDA / E0490 stance and Project Manage A posteriori Appel d'offres Open - National 470,000.00 0.00 Annulé 2023-06-07 2023-08-08 2023-06-14 2023-08-08 2023-07-29 2023-09-19 2023-08-12 2024-02-08 2023-08-26 iment qui abritera les Unités nvelope aux - (Processus à 6 ment de coordination et d’exécutio 1 enveloppe) n du projet KM-AEP SONELEC-379645-C W-RFB / Travaux de construc Demande d'offres Component 1: Investment in tion de lignes d’interconnexi Single Stage - One E - DTPM Travaux (s En cours d'e 2024-08-0 IDA / E0490 Power Storage, PV, and Syst A posteriori Appel d'offres Open - National 1,100,000.00 0.00 2023-10-19 2024-03-20 2023-10-24 2024-03-22 2023-12-05 2024-05-02 2024-01-04 2024-02-08 on MT des centrales PV de D nvelope ans préqualificati xécution 6 em Upgrades omoiboini - Voidjou (Grande on) Comore) et de Bambao - Tre nani (Anjouan) KM-AEP SONELEC-379629-C W-RFB / Travaux d'aménage Demande d'offres Component 1: Investment in ment d'un hangar avec ses di Single Stage - One E - DTPM Petits trav En cours d'e 2024-06-0 IDA / E0490 Power Storage, PV, and Syst A posteriori Appel d'offres Open - National 200,000.00 0.00 2023-09-09 2024-04-19 2023-09-14 2024-05-11 2023-10-26 2024-06-11 2023-11-10 2023-12-08 fférents espaces fonctionnell nvelope aux - (Processus à xécution 5 em Upgrades es pour installer l'atelier de r 1 enveloppe) éparation des transformateur s de la SONELEC Demande de prop KM-AEP SONELEC-385182-C ositions - Ingénier W-RFP / Travaux de construct ie, approvisionne Component 1: Investment in ion des 3 centrales photovolt Demande de prop Open - Internationa ment et construct 23,000,000.0 2026-03-1 IDA / 71290 Power Storage, PV, and Syst A priori 0.00 Annulé 2023-10-21 2024-02-19 2024-01-06 2024-07-15 2024-01-06 2023-10-26 2024-02-23 2024-03-16 2024-08-18 2024-09-22 aïques (PV) avec stockage à ositions l ion/clé en main - 0 6 em Upgrades Anjouan, Mohéli et Grande C DTPM Travaux (en omore deux étapes) - Ap plication de la dis qualification de l' KM-AEP SONELEC-447925-C entrepreneur W-RFB / Travaux d'aménage Demande de cota ment du Data Center (AMM Component 2: SONELEC Co Single Stage - One E tions (DTPM ne pr En attente d 2025-04-1 + MDM) à Moroni et des Cent IDA / E0490 mmercial and Operational R A posteriori Demande de prix Open - National 165,000.00 0.00 2024-09-10 2024-10-14 nvelope ovenant pas de la 'exécution 2 res de contrôle des compteur ecovery Banque) s des 3 antennes régionales Anjouan, Mohéli et Grande C omores . Demande de prop KM-AEP SONELEC- 385182 ositions - Ingénier CW-RFP / Travaux de constru Component 1: Investment in ie, approvisionne Demande de prop Limited - Internatio Single Stage - Two E 21,500,000.0 En attente d 2027-05-3 ction des 3 centrales photovo IDA / 71290 Power Storage, PV, and Syst A priori ment et construct 0.00 2024-09-05 2024-09-07 2024-10-19 2024-11-12 2024-11-28 ositions nal nvelope 0 'exécution 1 ltaïques (PV) avec stockage à em Upgrades ion/clé en main - Anjouan, Mohéli et Grande C DTPM Travaux (en omore une étape) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KM-AEP SONELEC-304146-G Component 2: SONELEC Co Open - Internationa Single Stage - One E En cours d'ex O-RFB / Acquisition de 130,0 IDA / 71290 mmercial and Operational R A priori Appel d'offres 4,000,000.00 0.00 2022-07-25 2023-04-07 2022-07-30 2023-05-09 2022-09-10 2022-10-10 2022-11-14 2023-05-13 l nvelope écution 00 compteurs prépayés de ty ecovery pe STS KM-AEP SONELEC-346653-G Component 3. Technical Assi Single Stage - One E En cours d'ex IDA / 71290 A posteriori Demande de prix Open - National 24,000.00 0.00 2023-03-13 2023-08-17 2023-03-25 2023-05-24 O-RFQ / Mobilier de bureau p stance and Project Manage nvelope écution our l'AEP ment KM-AEP SONELEC-346660-G Component 3. Technical Assi Single Stage - One E En cours d'ex O-RFQ / Achat du materiel inf IDA / E0490 stance and Project Manage A posteriori Demande de prix Open - National 42,000.00 0.00 2023-03-29 2023-08-17 2023-04-21 2023-06-20 nvelope écution ormatique pour l'AEP ment KM-AEP SONELEC-350445-G O-RFB / Fournitures d'une inf Component 2: SONELEC Co rastructure de comptage ava Open - Internationa Single Stage - Two E En cours d'ex IDA / E0490 mmercial and Operational R A priori Appel d'offres 4,000,000.00 0.00 2023-03-20 2023-08-10 2023-04-03 2023-08-11 2023-06-09 2023-08-11 2023-06-19 2023-11-06 2023-07-06 2024-07-05 ncée (AMI) comprenant des c l nvelope écution ecovery ompteurs STS communicants et un système automatisé de gestion des compteurs KM-AEP SONELEC-346647-G O-RFQ / Achat de 4 véhicules Component 3. Technical Assi Single Stage - One E En cours d'ex pour l'AEP dont 2 véhicules d IDA / E0490 stance and Project Manage A posteriori Demande de prix Open - National 150,000.00 0.00 2023-05-27 2023-08-17 2023-06-13 2023-08-12 nvelope écution e terrain et 2 pour le bureau ment (coordination et administrati on). KM-AEP SONELEC-363637-G O-DIR / Acquisition, formatio Component 3. Technical Assi Passation de marc Direct - Internation En attente d' n et assistance du logiciel TO IDA / E0490 stance and Project Manage A posteriori 25,000.00 0.00 2023-05-25 2023-05-28 2023-06-21 2027-12-31 hé de gré à gré al exécution MPRO WEB pour la gestion d ment es deux unités de coordinatio n UCP et AEP. KM-AEP SONELEC-363840-G Component 3. Technical Assi O-RFQ / Fournitures d'un gén Single Stage - One E En attente d' IDA / E0490 stance and Project Manage A posteriori Demande de prix Open - National 30,000.00 0.00 2023-06-05 2023-07-31 2024-01-27 érateur solaire pour l’énergie nvelope exécution ment de secours du bureau du proj et KM-AEP SONELEC-379636-G O-RFB / Fournitures de matér Component 1: Investment in Single Stage - One E iels électriques, nécessaires IDA / E0490 Power Storage, PV, and Syst A posteriori Appel d'offres Open - National 450,000.00 0.00 Signé 2023-10-10 2023-10-25 2023-10-15 2023-10-25 2023-11-26 2023-12-05 2023-12-17 2023-12-08 2024-01-07 2024-01-15 2024-07-05 nvelope pour l’entretien et l’extensio em Upgrades n des réseaux MT et BT de la SONELEC KM-AEP SONELEC-379633-G O-RFB / Fournitures, installati Component 1: Investment in on et mise en service d’équip Single Stage - One E En cours d'ex IDA / E0490 Power Storage, PV, and Syst A posteriori Appel d'offres Open - National 400,000.00 0.00 2023-10-10 2023-11-20 2023-10-15 2023-11-19 2023-11-26 2023-12-17 2024-01-10 2024-08-07 ements; de matériels et d'out nvelope écution em Upgrades ils pour l'atelier de réparation des transformateurs de la SO NELEC. Page 1 KM-AEP SONELEC-412517-G O-RFB / Fournitures, installati Component 1: Investment in Single Stage - One E En cours d'ex on et mise en service de mat IDA / E0490 Power Storage, PV, and Syst A posteriori Appel d'offres Open - National 400,000.00 0.00 2024-03-05 2024-04-04 2024-03-05 2024-04-16 2024-06-07 2024-04-30 2024-05-19 2025-11-10 nvelope écution eriels de réparation des trans em Upgrades formateurs de la SONELEC KM-AEP SONELEC-420829-G O-RFP / Conception, installati Component 2: SONELEC Co on et mise en service d’un sy Demande de prop Open - Internationa Single Stage - Two E En cours d'ex IDA / E0490 mmercial and Operational R A priori 4,000,000.00 0.00 2024-04-09 2024-05-27 2024-04-09 2024-06-18 2024-05-21 2024-07-22 2024-06-16 2024-07-02 2026-07-02 stème informatique de gestio ositions l nvelope amen ecovery n à la Société Nationale d’Éle ctricité des Comores (SONEL EC) KM-AEP SONELEC-447894-G O-RFB / Acquisitions de 9 véh icules pour les déplacements Component 2: SONELEC Co Single Stage - One E En attente d' des équipes de pose des com IDA / E0490 mmercial and Operational R A posteriori Appel d'offres Open - National 313,043.00 0.00 2024-09-02 2024-09-07 2024-10-07 2024-10-14 2024-11-02 2025-03-02 nvelope exécution pteurs au niveau des sites d'i ecovery ntervention et pour livrer les compteurs et fournitures aux points de pose. KM-AEP SONELEC-445543-G O-DIR / Fournitures, installati Component 1: Investment in Passation de marc Direct - Internation En attente d' on et mise en service de mat IDA / E0490 Power Storage, PV, and Syst A posteriori 630,000.00 0.00 2024-09-06 2024-09-11 2024-09-16 2025-03-15 hé de gré à gré al exécution ériels de réparation des trans em Upgrades formateurs de la SONELEC. KM-AEP SONELEC-449423-G O-RFB / Conception, acquisiti on d’équipements, Installatio Component 1: Investment in Single Stage - One E En attente d' n, Mise en service et Opérati IDA / E0490 Power Storage, PV, and Syst A priori Appel d'offres Open - National 1,900,000.00 0.00 2024-09-05 2024-09-06 2024-10-06 2024-10-09 2024-10-24 2025-04-22 nvelope exécution on & Entretienne d’une centr em Upgrades ale solaire photovoltaïque du Centre Hospitalier Universitai re El Maarouf à Moroni, Como res NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KM-AEP SONELEC-346565-N C-DIR / Location de bureaux t Component 3. Technical Assi Passation de marc En attente d' emporaire pour l'AEP, en atte IDA / E0490 stance and Project Manage A posteriori Direct - National 32,000.00 0.00 2023-03-01 2023-03-06 2023-03-10 2024-03-09 hé de gré à gré exécution ndant la construction et l'am ment énagement du bâtiment dev ant abriter le projet KM-AEP SONELEC-412804-N C-RFQ / Collecte de données Component 3. Technical Assi pour la réalisation de sondag Single Stage - One E En cours d'ex IDA / E0490 stance and Project Manage A posteriori Demande de prix Open - National 22,014.00 0.00 2024-03-04 2024-04-24 2024-04-06 2024-06-05 es d'opinion pour le suivi de l nvelope écution ment a campagne de communicati on et de sensibilisation basée sur le Genre. KM-AEP SONELEC-412807-N C-RFQ / Recrutement d'une a Component 3. Technical Assi gence de communication pou Single Stage - One E En attente d' IDA / E0490 stance and Project Manage A posteriori Demande de prix Open - National 22,014.00 0.00 2024-03-04 2024-04-07 2024-07-16 r l'élaboration des outils pour nvelope exécution ment la campagne de communicati on et de sensibilisation basée sur le genre. KM-AEP SONELEC-420753-N C-DIR / Mise a jour du systèm Component 2: SONELEC Co e de prépaiement STS à la S Passation de marc Direct - Internation En cours d'ex IDA / E0490 mmercial and Operational R A posteriori 134,000.00 0.00 2024-04-05 2024-04-15 2024-04-07 2024-03-15 2024-04-15 2024-07-14 ONELEC, en conformité avec hé de gré à gré al écution ecovery le dernier Standard STS Éditi on 2 tel que requis par l'Asso ciation STS. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KM-AEP SONELEC-321844-C Component 3. Technical Assi Sélection fondée s S-CQS / Recrutement du resp IDA / 71290 stance and Project Manage A posteriori ur les qualification Open - National 90,000.00 0.00 Annulé 2022-10-18 2022-11-28 2022-11-08 2022-12-22 2023-01-21 2023-02-25 2023-08-24 onsable Administratif et finan ment s des consultants cier (RAF) PIU SONELEC KM-AEP SONELEC-324703-C Component 3. Technical Assi Sélection fondée s S-CQS / Recrutement du spéc IDA / 71290 stance and Project Manage A posteriori ur les qualification Open - National 72,000.00 0.00 Annulé 2022-11-05 2022-11-26 2023-01-09 2023-02-08 2023-03-15 2023-09-11 ialiste en gestion commercial ment s des consultants e KM-AEP SONELEC-324705-C Component 3. Technical Assi Sélection fondée s S-CQS / Recrutement du spéc IDA / 71290 stance and Project Manage A posteriori ur les qualification Open - National 72,000.00 0.00 Annulé 2022-11-05 2022-11-26 2023-01-09 2023-02-08 2023-03-15 2023-09-11 ialiste en Protection de reven ment s des consultants us KM-AEP SONELEC-324706-C Component 3. Technical Assi Sélection fondée s S-CQS / Recrutement du spéc IDA / 71290 stance and Project Manage A posteriori ur les qualification Open - National 90,000.00 0.00 Annulé 2022-11-05 2022-11-26 2023-01-09 2023-02-08 2023-03-15 2023-09-11 ialiste en Système informatiq ment s des consultants ue de gestion KM-AEP SONELEC-304150-C Component 2: SONELEC Co Sélection fondée s S-LCS / Assistance technique Open - Internationa En cours d'exécut IDA / 71290 mmercial and Operational R A priori ur la qualité et le 500,000.00 0.00 2022-11-21 2023-01-17 2022-12-12 2023-05-09 2023-01-25 2023-09-19 2023-02-22 2023-10-31 2023-03-24 2024-05-24 2023-04-28 2024-07-15 2023-06-02 2024-06-01 relative à la séparation de S l ion ecovery coût ONELEC et SONEDE, fusion M AMWE et EDA KM-AEP SONELEC-330521-C Component 3. Technical Assi Sélection fondée s S-CQS / Recrutement d'un sp IDA / 71290 stance and Project Manage A posteriori ur les qualification Open - National 72,000.00 0.00 Annulé 2022-12-07 2022-12-09 2022-12-28 2023-02-10 2023-03-12 2023-04-16 2023-10-13 écialiste en sauvegarde envir ment s des consultants onnementale. KM-AEP SONELEC-330522-C Component 3. Technical Assi Sélection fondée s S-CQS / Recrutement d'un sp IDA / 71290 stance and Project Manage A posteriori ur les qualification Open - National 72,000.00 0.00 Annulé 2022-12-07 2022-12-10 2022-12-28 2023-02-10 2023-03-12 2023-04-16 2023-10-13 écialiste en sauvegarde socia ment s des consultants le KM-AEP SONELEC-333020-C S-CQS / Recrutement Ingénie Component 3. Technical Assi Sélection fondée s Open - Internationa ur Conseil pour les travaux d IDA / 71290 stance and Project Manage A posteriori ur les qualification 300,000.00 0.00 Annulé 2022-12-23 2023-01-13 2023-02-26 2023-03-28 2023-05-02 2023-10-29 l e réhabilitation et d'automati ment s des consultants sation des réseaux de distrib ution Page 2 KM-AEP SONELEC-333022-C Component 3. Technical Assi Sélection fondée s S-CQS / Recrutement Ingénie Open - Internationa IDA / 71290 stance and Project Manage A posteriori ur les qualification 300,000.00 0.00 Annulé 2022-12-23 2023-01-13 2023-02-26 2023-03-28 2023-05-02 2023-10-29 ur conseil pour la maitrise d' l ment s des consultants œuvre du centre de dispatchi ng KM-AEP SONELEC-345662-C S-QCBS / Recrutement Ingéni Component 3. Technical Assi Sélection fondée s eur conseil pour les travaux Open - Internationa IDA / 71290 stance and Project Manage A priori ur la qualité et le 600,000.00 0.00 Annulé 2023-02-28 2023-03-21 2023-04-13 2023-04-27 2023-05-18 2023-06-15 2023-07-01 2025-06-30 de rehabilitation, d'automatis l ment coût ation du réseau électrique et la mise en place du centre de dispatching. KM-AEP SONELEC-362591-C Component 3. Technical Assi Sélection fondée s S-QCBS / Audit des états fina Open - Internationa En cours d'exécut IDA / E0490 stance and Project Manage A posteriori ur la qualité et le 40,000.00 0.00 2023-05-30 2023-09-14 2023-06-20 2024-06-20 2023-07-21 2023-08-04 2023-08-25 2023-09-29 2023-11-03 2024-11-02 nciers de MAMWE et EDA pou l ion ment coût r 2018-2019, SONELEC 2020- 2022 KM-AEP SONELEC-371974-C S-QCBS / Recrutement de l'A Component 3. Technical Assi uditeur externe du Projet, co Sélection au moin Open - Internationa En cours d'exécut IDA / E0490 stance and Project Manage A posteriori 90,000.00 0.00 2023-07-17 2023-07-04 2023-08-07 2023-11-18 2023-08-22 2023-12-14 2023-08-29 2024-01-25 2023-09-12 2024-02-02 2023-10-10 2023-11-03 2026-07-30 mprenant les deux unités de dre coût l ion ment coordination UCP et AEP, po ur les 3 exercice 2023, 2024 et 2025. KM-AEP SONELEC-385173-C S-QCBS / Recrutement d’un c Component 3. Technical Assi Sélection fondée s abinet pour la Maîtrise d’œuv En cours d'exécut IDA / E0490 stance and Project Manage A posteriori ur la qualité et le Open - National 60,000.00 0.00 2023-10-03 2023-09-15 2023-10-24 2023-11-07 2023-11-21 2024-01-11 2023-12-19 2024-02-16 2023-12-20 2024-02-23 2024-01-04 2024-04-18 2024-02-01 2025-01-31 re Institutionnelle et Sociale ( ion ment coût MOIS) pour la mise en œuvre du cadre de réinstallation et des MGP KM-AEP SONELEC-385175-C S-QCBS / RECRUTEMENT D’U Component 3. Technical Assi Sélection fondée s N INGÉNIEUR CONSEIL CONS Open - Internationa En cours d'exécut IDA / E0490 stance and Project Manage A priori ur la qualité et le 1,000,000.00 0.00 2023-10-03 2023-10-23 2023-10-24 2023-12-01 2023-11-21 2024-05-27 2023-12-05 2024-07-05 2023-12-26 2024-08-29 2024-01-30 2024-02-27 2025-02-26 TRUCTION DE CENTRALE PV l ion ment coût AVEC STOCKAGE, RÉSEAU, T ELECONDUITE ET DISPATCHI NG KM-AEP SONELEC-333013-C S-CQS / RECRUTEMENT D’UN Component 3. Technical Assi Sélection fondée s INGÉNIEUR CONSEIL CONSTR Open - Internationa IDA / E0490 stance and Project Manage A priori ur les qualification 1,000,000.00 0.00 Annulé 2023-05-12 2023-07-19 2023-05-19 2023-06-09 2023-06-23 2023-07-28 2024-07-27 UCTION DE CENTRALE PV AV l ment s des consultants EC STOCKAGE, RÉSEAU, TEL ECONDUITE ET DISPATCHING KM-AEP SONELEC-438605-C S-LCS / Recrutement du vérifi cateur indépendant de la Maî Component 1: Investment in Sélection au moin Open - Internationa En attente d'exéc trise d’œuvre Institutionnelle IDA / E0490 Power Storage, PV, and Syst A posteriori 25,000.00 0.00 2024-07-22 2024-07-23 2024-08-08 2024-08-09 2024-08-12 2024-08-15 2024-08-30 2025-02-26 dre coût l ution et Sociale (MOIS), pour le pai em Upgrades ement des compensations de s personnes affectées par le Projet. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KM-AEP SONELEC-318192-C Component 3. Technical Assi En cours d'exécut S-INDV / Recrutement du res IDA / 71290 stance and Project Manage A posteriori Individuel Open - National 90,000.00 0.00 2022-09-30 2022-11-28 2022-11-18 2022-12-09 2023-01-13 2023-07-12 ion ponsable en passation de ma ment rche de l'AEP KM-AEP SONELEC-321846-C Component 3. Technical Assi S-INDV / Recrutement d'un s IDA / 71290 stance and Project Manage A posteriori Individuel Open - National 90,000.00 0.00 Annulé 2022-10-20 2022-12-08 2022-12-29 2023-02-02 2023-08-01 pécialiste en énergie solaire ment et distribution électrique pou r le PIU SONELEC KM-AEP SONELEC-346299-C Component 3. Technical Assi S-INDV / Recrutement du spé IDA / 71290 stance and Project Manage A posteriori Individuel Open - National 90,000.00 0.00 Annulé 2023-03-07 2023-04-09 2023-04-23 2023-05-07 2024-05-06 cialiste en Système Informati ment que de Gestion KM-AEP SONELEC-346301-C Component 3. Technical Assi S-INDV / Recrutement du Spé IDA / 71290 stance and Project Manage A posteriori Individuel Open - National 72,000.00 0.00 Annulé 2023-03-07 2023-04-09 2023-04-19 2023-05-03 2024-05-02 cialiste en Gestion Commerci ment ale KM-AEP SONELEC-346567-C S-INDV / Recrutement d'un e Component 3. Technical Assi Open - Internationa En cours d'exécut xpert pour fournir assistance IDA / 71290 stance and Project Manage A posteriori Individuel 50,000.00 0.00 2023-03-08 2023-06-17 2023-04-17 2023-05-01 2023-05-22 2023-11-18 l ion technique à l’implémentation ment du Système Informatique de Gestion de la SONELEC KM-AEP SONELEC-347463-C S-INDV / Recrutement d'un s pécialiste en Passation de m Component 3. Technical Assi Direct - Internation En cours d'exécut arché temporaire, en attenda IDA / E0490 stance and Project Manage A posteriori Individuel 20,000.00 0.00 2023-05-29 2023-06-03 2023-06-08 2023-06-15 2023-07-09 2023-10-07 al ion nt de relancer de l'appel à ca ment ndidatures du Responsable Passation de Marché pour l'A EP et pour l'UCP. KM-AEP SONELEC-346548-C Component 3. Technical Assi En attente d'exéc S-INDV / Recrutement du Res IDA / E0490 stance and Project Manage A posteriori Individuel Open - National 90,000.00 0.00 2022-09-30 2023-02-07 2023-02-10 2023-03-05 2024-03-04 ution ponsable Administratif et Fin ment ancier AEP KM-AEP SONELEC-346556-C Component 3. Technical Assi En attente d'exéc S-INDV / Recrutement du Spe IDA / E0490 stance and Project Manage A posteriori Individuel Open - National 90,000.00 0.00 2022-09-30 2023-02-07 2023-02-10 2023-03-05 2024-03-04 ution cialiste en Sauvegarde Social ment e AEP KM-AEP SONELEC-346465-C Component 3. Technical Assi S-INDV / Recrutement du Coo En attente d'exéc IDA / E0490 stance and Project Manage A posteriori Individuel Open - National 150,000.00 0.00 2022-05-30 2022-10-27 2022-12-01 2023-01-03 2024-01-03 rdonnateur de l'Agence d’Exé ution ment cution du Projet (AEP) KM-AEP SONELEC-346558-C Component 3. Technical Assi S-INDV / Recrutement du Spé En attente d'exéc IDA / E0490 stance and Project Manage A posteriori Individuel Open - National 90,000.00 0.00 2022-09-30 2023-02-07 2023-02-10 2023-03-05 2023-09-01 cialiste en Sauvegarde Envir ution ment onnementale de l'AEP Page 3 KM-AEP SONELEC-346322-C S-INDV / Recrutement d'un C Component 3. Technical Assi Open - Internationa En cours d'exécut onsultant en Programme de IDA / E0490 stance and Project Manage A posteriori Individuel 50,000.00 0.00 2023-03-07 2023-06-07 2023-04-25 2023-05-16 2023-06-09 2023-12-06 l ion Protection des Revenus pour ment la mise en oeuvre des compt eurs communicants KM-AEP SONELEC-349463-C Component 3. Technical Assi En cours d'exécut S-INDV / Recrutement d'un c IDA / E0490 stance and Project Manage A posteriori Individuel Open - National 53,000.00 0.00 2023-03-17 2023-04-03 2023-04-10 2023-04-12 2023-04-16 2023-10-13 ion omptable de l'AEP ment KM-AEP SONELEC-349484-C Component 3. Technical Assi En cours d'exécut S-INDV / Recrutement de l'As IDA / E0490 stance and Project Manage A posteriori Individuel Open - National 45,000.00 0.00 2023-03-24 2023-05-24 2023-04-25 2023-04-30 2023-05-24 2024-05-23 ion sistant(e) Administratif(ve) d ment e l'AEP KM-AEP SONELEC-362597-C Component 3. Technical Assi En cours d'exécut S-INDV / Recrutement d'un S IDA / E0490 stance and Project Manage A posteriori Individuel Open - National 90,000.00 0.00 2023-05-31 2023-07-03 2023-06-20 2023-07-04 2023-07-25 2024-01-21 ion pécialiste en Violence Basée ment sur le Genre KM-AEP SONELEC-362614-C Component 3. Technical Assi En cours d'exécut S-INDV / Recrutement Spécia IDA / E0490 stance and Project Manage A posteriori Individuel Open - National 90,000.00 0.00 2023-05-31 2023-09-25 2023-07-03 2023-07-10 2023-07-31 2024-07-30 ion liste Hygiène Santé Securite ment au travail KM-AEP SONELEC-362637-C Component 3. Technical Assi En cours d'exécut S-INDV / Recrutement de l'As IDA / E0490 stance and Project Manage A posteriori Individuel Open - National 53,000.00 0.00 2023-05-24 2023-09-01 2023-06-22 2023-06-24 2023-06-29 2023-07-02 ion sistant(e) en passation de m ment archés de l'AEP KM-AEP SONELEC-362674-C Component 3. Technical Assi En attente d'exéc S-INDV / Recrutement du gar IDA / E0490 stance and Project Manage A posteriori Individuel Limited 29,000.00 0.00 2023-05-26 2023-05-31 2023-06-03 2023-06-09 2024-06-08 ution dien de l'AEP ment KM-AEP SONELEC-362675-C Component 3. Technical Assi En attente d'exéc S-INDV / Recrutement d'un A IDA / E0490 stance and Project Manage A posteriori Individuel Limited 24,000.00 0.00 2023-05-26 2023-05-31 2023-06-03 2023-06-15 2024-06-14 ution gent d'entretien des bureaux ment de l'AEP KM-AEP SONELEC-362676-C Component 3. Technical Assi En attente d'exéc S-INDV / Recrutement du cha IDA / E0490 stance and Project Manage A posteriori Individuel Limited 33,000.00 0.00 2023-06-08 2023-06-13 2023-06-18 2023-06-28 2024-06-27 ution uffeur de la coordination de l' ment AEP KM-AEP SONELEC-362677-C Component 3. Technical Assi En attente d'exéc S-INDV / Recrutement du cha IDA / E0490 stance and Project Manage A posteriori Individuel Limited 33,000.00 0.00 2023-06-15 2023-06-20 2023-06-25 2023-07-01 2024-06-30 ution uffeur coursier de l'AEP ment KM-AEP SONELEC-362679-C Component 3. Technical Assi S-INDV / Recrutement du (1e En attente d'exéc IDA / E0490 stance and Project Manage A posteriori Individuel Limited 33,000.00 0.00 2023-06-15 2023-06-20 2023-06-25 2023-07-01 2024-06-30 r) chauffeur pour les visites d ution ment e terrain de l'AEP KM-AEP SONELEC-362680-C Component 3. Technical Assi En attente d'exéc S-INDV / Recrutement du (2e IDA / E0490 stance and Project Manage A posteriori Individuel Limited 33,000.00 0.00 2023-06-15 2023-06-20 2023-06-25 2023-07-01 2024-06-30 ution r) chauffeur de terrain de l'A ment EP KM-AEP SONELEC-362683-C Component 3. Technical Assi En attente d'exéc S-INDV / Recrutement d'un (1 IDA / E0490 stance and Project Manage A posteriori Individuel Open - National 5,500.00 0.00 2023-05-31 2023-07-01 2023-07-04 2023-07-16 2024-12-27 ution er) stagiaire en passation de ment marchés KM-AEP SONELEC-362689-C Component 3. Technical Assi En attente d'exéc S-INDV / Recrutement d'un (2 IDA / E0490 stance and Project Manage A posteriori Individuel Open - National 5,500.00 0.00 2023-05-31 2023-06-26 2023-06-29 2023-07-11 2024-12-22 ution eme) stagiaire en passation ment de marchés KM-AEP SONELEC-412512-C Component 3. Technical Assi En cours d'exécut S-INDV / Recrutement du res IDA / E0490 stance and Project Manage A posteriori Individuel Limited - National 52,000.00 0.00 2024-02-29 2024-04-04 2024-03-05 2024-03-15 2024-03-10 2024-04-16 2024-03-29 2027-05-23 ion ponsable de passation de ma ment rchés de l'AEP KM-AEP SONELEC-410362-C S-CDS / Etudes géotechnique s avec levé topographique de Component 1: Investment in Sélection de cons s 3 sites de construction des En cours d'exame IDA / E0490 Power Storage, PV, and Syst A posteriori ultants par entent Direct - National 160,000.00 0.00 2024-02-22 2024-02-17 2024-03-03 2024-03-18 2024-05-07 centrales Photovolatiques et n em Upgrades e directe de Stockage des 3 sites Bam bao Mtsanga à Anjouan, Fom boni à Mohéli et Domoiboini à la Grande Comore. KM-AEP SONELEC-410360-C S-CDS / Déploiement de la C ampagne de communication Component 3. Technical Assi Sélection de cons En attente d'exéc et de sensibilisation basée su IDA / E0490 stance and Project Manage A posteriori ultants par entent Direct - National 70,446.00 0.00 2024-02-23 2024-03-13 2024-05-01 2024-07-30 ution r le genre, auprès des cibles, ment e directe via les agents de sensibilisati on-femmes et les association s. KM-AEP SONELEC-410365-C S-CDS / Etude de conception Component 3. Technical Assi Sélection de cons et élaboration du cahier de c En cours d'exécut IDA / E0490 stance and Project Manage A posteriori ultants par entent Direct - National 15,000.00 0.00 2024-03-04 2024-03-12 2024-03-14 2024-03-31 2024-09-27 harges du hangar ainsi que l ion ment e directe a surveillance des travaux de réhabilitation de l’atelier de r éparation des transformateur s. KM-AEP SONELEC-426241-C Component 3. Technical Assi En attente d'exéc S-INDV / Recrutement de l'Ex IDA / E0490 stance and Project Manage A posteriori Individuel Open - National 56,000.00 0.00 2024-05-08 2024-06-09 2024-06-14 2024-07-03 2027-05-29 ution pert technique de l'AEP ment KM-AEP SONELEC-428086-C S-INDV / MISSION DE CONSU LTANT POUR L’ÉVALUATION Component 1: Investment in Limited - Internatio En attente d'exéc DES BESOINS EN ELECTRICIT IDA / E0490 Power Storage, PV, and Syst A posteriori Individuel 27,000.00 0.00 2024-05-31 2024-06-03 2024-06-04 2024-06-07 2024-08-06 nal ution E, DES ALTERNATIVES D'APP em Upgrades ROVISIONNEMENT ET PREPA RATION DE DAO POUR L'HOPI TAL EL MAAROUF, MORONI Page 4