The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) MIDDLE EAST AND NORTH AFRICA | Morocco | Environment, Natural Resources & the Blue Economy Global Practice | Requesting Unit: MNC01 (392) | Responsible Unit: SMNEN (9273) IBRD/IDA | Program-for-Results Financing | FY 2023 | Team Leader(s): Carole Megevand, Abdoulaye Sy Seq No: 3 | Archived on 04-Sep-2024 | ISR00751 | Created by: Wafaa Firachine on 29-May-2024 | Modified by: Carole Megevand on 27-Aug-2024 1. PROJECT DEVELOPMENT OBJECTIVE 1.1 Development Objective Original Development Objective (Approved as part of Approval package on 09-Jun-2023) The Objective of the Program is to strengthen the institutional capacity to implement the NDC and enhance climate resilience of targeted vulnerable groups and ecosystems in the Program area. 2. OVERALL RATINGS Name Previous Current Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Substantial Substantial 3. KEY ISSUES & STATUS 3.1 Implementation Status and Key Decisions The Climate PforR was declared effective on January 8, 2024. As per legal covenants, the Governance structures are in place (PIU and Steering Committee). The MOP has been prepared by the PIU, in close coordination with the implementing agencies involved in the Program, is now under final review by the World Bank team. Implementation progress is satisfactory and some DLRs have already been achieved. An AIIB team joined to mission to initiate the preparation of an Additional Financing to the Program, with a focus on the preservation/rehabilitation of vulnerable ecosystems. May 31, 2025 Page 1 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) 4. DATA ON FINANCIAL PERFORMANCE 4.1 Disbursements (by loan) Loan/Credit/TF Status Original Revised Cancelled Disbursed Undisbursed % Disbursed IBRD-95480 Effective 350.00 350.00 0.00 102.25 246.11 29.35% 4.2 Key Dates (by loan) Loan/Credit/TF Status Approval Signing Effectiveness Orig. Closing Rev. Closing IBRD-95480 Effective 09-Jun-2023 26-Oct-2023 08-Jan-2024 30-Jun-2028 30-Jun-2028 4.3 Program Action Plan A PIU is set up at MEF/DB with adequate staffing, including one full-time Environmental and Action Description Social specialist and Fiduciary Focal Points Source DLI# Responsibility Timing Timing Value Status 90 days after the Other NA MEF - PMU Other Completed Effective Date Completion PIU is staffed (with adequate E&S and Fiduciary personnel) and remains well staffed Measurement throughout the Program implementation PIU formally created on February 5, 2024 and appropriately staffed. The PIU is fully Comments operational. Action Description The Steering Committee has been established Source DLI# Responsibility Timing Timing Value Status no later than 90 Other NA MEF Other days after Completed effectiveness May 31, 2025 Page 2 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) The Steering Committee is composed of representatives of the entities and institutions Completion participating in the implementation, monitoring and evaluation of the Program, responsible Measurement for strategic oversight and guidance under the Program The Steering Committee (SC) was established on Apr. During the May mission, a meeting was Comments held during the mission between MEF and MTEDD to clarify the coordination mechanisms (reporting) between the SC the CNCCDB Action Description The Program Operations Manual (POM) is adopted Source DLI# Responsibility Timing Timing Value Status no later than 120 Other NA PIU / MEF Other days after Completed effectiveness date Completion The POM sets the rule that governs the implementation of the Program, as defined in the Measurement Loan Agreement Comments The POM has been formally adopted during the supervision mission. A dedicated budget is earmarked for the implementation and monitoring of the ESSA Action Description Program Action Plan. Source DLI# Responsibility Timing Timing Value Status Environmental and All Implementing NA Recurrent Yearly Completed Social Systems agencies Completion Implementing agencies will make sure appropriate budget is allocated to E&S actions Measurement included in the PAP throughout the implementation of the Program A E&S training session was organized during the last SPN mission with the E&S focal points Comments from all the implementing agencies: it helped clarify this requirement and ensure proper budget allocation for next CY (budget preparation process is ongoing) Action Description Environmental and Social Focal Points are nominated by each Implementing Agencies. Source DLI# Responsibility Timing Timing Value Status 1 month after Environmental and Implementing NA Other the Effective Completed Social Systems Agencies Date Completion E&S Focal Points are nominated by each Implementing Agency and ensure coordination with Measurement the E&S specialist in the PMU. May 31, 2025 Page 3 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) E&S Focal points have been nominated by ANDZOA and ANEF (under discussion for the Comments DGM) Action Description Preparation of the Environmental and Social Technical Manual for the Program Source DLI# Responsibility Timing Timing Value Status No later than 6 months after Environmental and effectiveness and NA E&S Focal points Other In Progress Social Systems valid throughout Program implementation E&S Technical manual is developed and is acceptable to the Bank: it includes guidance on Completion accidents/incidents notification, management of contractors, Stakeholder Engagement Plans Measurement for the respective Implementing Agencies, and grievance mechanisms. During the last SPN mission (dec), all E&S focal points participated to the E&S training session Comments aiming at (i) finalizing the E&S section of the MOP and (ii) drafting the E&S Technical Manual. The PIU should share shortly a final version with the WB. Capacity building on environmental and social risk management of relevant stakeholders, Action Description including contractors. Source DLI# Responsibility Timing Timing Value Status Environmental and MEF/E&S Focal NA Recurrent Continuous Completed Social Systems Point Completion The training module is prepared 6 months after effectiveness and is implemented Measurement continuously throughout the Program, as needed. A first training session was delivered during the last SPN mission in May. It was followed by Comments thematic meetings with specific implementing agencies. Another training was delivered during the last SPN mission in dec. Action Description OP 7.50 Verification Protocol Source DLI# Responsibility Timing Timing Value Status No later than 6 Environmental and DRPE, ANDZOA and months after NA Other Completed Social Systems MEF effectiveness and semi-annually May 31, 2025 Page 4 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) Semi-annual reports provided on water resources quality and piezometric level monitoring Completion and analysis. Measurement Reports prepared by DRPE and the concerned Hydraulic Basin Agency. The construction of two aquifer recharges was completed and the WB team has closely Comments monitored with E&S focal point and confirmed that the system put in place by the MEE/DRPE to monitor the piezometric level of the affected aquifers is satisfactory. The Mechanism for compensation and livelihood restoration of forest communities - as per Action Description decree order No. 1855-01 of March 21, 2002, and amended by Order No. 714-22 of March 2, 2022 - is strengthened by the ANEF. Source DLI# Responsibility Timing Timing Value Status 6 months after Effectiveness before Environmental and NA ANEF Other commencement of In Progress Social Systems public works implemented by ANEF The "Mechanism" is consulted with local communities at least biannually, it is gender- Completion sensitive and site-specific. It includes M&E tools. It remains valid throughout the Measurement implementation period of the Program. The ANEF will enhance the existing Mechanism as follows: (i) update the stakeholder Comments commitment plan and consult with communities as needed (minimum semi-annual); and (ii) develop a method for tracking stakeholder engagement, grievance and livelihood. Action Description Maintain adequate budget planning by all IAs. Source DLI# Responsibility Timing Timing Value Status Fiduciary Systems NA WB/PIU Recurrent Yearly Completed Completion Development of an annual Work Plan and Budgeted (AWPB) by IAs to be transmitted to the Measurement PIU and the Bank for approval. PIU is coordinating with focal points of the different IAs to ensure proper budget allocation Comments for Program implementation. Action Description ANEF finalizes the preparation of its Gender Action Plan Source DLI# Responsibility Timing Timing Value Status May 31, 2025 Page 5 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) Prior to Environmental and NA ANEF Other commencement of Completed Social Systems works Completion The Gender Action Plan is finalized and is acceptable to the Bank. It remains valid throughout Measurement the implementation period of the Program. The Gender Action Plan for ANEF has been adopted and gender component is being Comments integrated into the continuous training plan, communication plan. Action Description The ANDZOA prepares a Gender Assessment Source DLI# Responsibility Timing Timing Value Status Prior to Environmental and NA ANDZOA Other commencement of In Progress Social Systems civil works Completion The Gender Assessment is prepared and is acceptable to the Bank. It remains valid Measurement throughout the implementation period of the Program. The preparation of the Gender Assessment is part of the activities to be supported under the Comments PROGREEN IPF, that has been approved in June 2025. This activity should be launched shortly by ANDZOA. Action Description Electronic waste management is prepared as part of the Technical Manual Source DLI# Responsibility Timing Timing Value Status No later than 6 Environmental and MEF, DGM and NA Other months after In Progress Social Systems DGM's partners effectiveness Completion The e-waste management modalities are included in the E&S technical manual Measurement The section of the E&S technical Manual related to the e-waste management has been Comments prepared by the DGM Adequate fiduciary coordination mechanisms due to the inclusion of several entities from Action Description various ministries, central and regional entities in the program. Source DLI# Responsibility Timing Timing Value Status At Program Fiduciary Systems NA PIU/IAS Other Completed launch May 31, 2025 Page 6 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) (a) Establishment of a PIU at DB, supported by a dedicated fiduciary focal point and/or an FM Completion officer, with enhanced fiduciary coordination with implementing entities Measurement (b) ADA, ANDZOA, DDFP, DPRE, ANEF established fiduciary focal points for fiduciary. Fiduciary aspects are managed directly by focal points appointed by each implementing Comments agency. A first fiduciary reporting exercise has already been performed and reported in the June 2024 progress report. Support by World Bank teams through training programs for entities with capacity challenges Action Description on fiduciary requirements under PforR, including strengthening fiduciary?coordination arrangements at the national and decentralized levels under the Program. Source DLI# Responsibility Timing Timing Value Status At Program Fiduciary Systems NA MEF/PIU Other Completed launch Completion A capacity building training of Implementing entities fiduciary staff and regular trainings Measurement refreshers throughout the Program’s implementation period are delivered. Fiduciary coordination was strengthened by appointing fiduciary focal points and preparing Comments the first financial report covering 1st semester 2024, that meets the bank's standards. Delivery of fiduciary capacity building programs to ADA, ANDZOA and ANEF, and other IAs, at Action Description central and local levels and implementation of robust M&E MIS (modules in FM and Procurement) Source DLI# Responsibility Timing Timing Value Status Fiduciary Systems NA WB/PIU/IAs Recurrent Continuous Not Yet Due Completion Fiduciary capacity and coordination are strengthened for ADA, ANEF and ANZOA and all IEs, Measurement enabling production of acceptable bi-annual consolidated fiduciary reporting. In December 2024, a fiduciary training session was held, concentrating on the preparation of Comments the ABWP model, the program's annual financial statements, and the periodic reconciliation between the PEF execution and the WB's disbursements. Review by the FM Bank team of semester interim financial reports (IFRs) and accounting Action Description conventions used to prepare those, to ensure timely expenditures and annual financial statements. Source DLI# Responsibility Timing Timing Value Status Fiduciary Systems NA PIU/WB Recurrent Continuous In Progress Completion Acceptable semester IFRs and annual audited financial statements prepared and submitted Measurement on time. May 31, 2025 Page 7 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) The IFR for the first semester of 2024 was submitted on time and is acceptable to the Bank. Comments The financial statements as of June 2024 were accurately presented and correctly consolidated by the PIU. Maintain a register of all procurement-related complaints and ensure that they are treated Action Description promptly. Source DLI# Responsibility Timing Timing Value Status Fiduciary Systems NA PIU/IAs Other Continuous Not Yet Due A register is designed by PIU-with Bank’s support - and disseminated to all central and Completion regional entities involved in the program’s implementation for mandatory use by them to Measurement track all procurement-related complaints. The mechanism for handling the procurement complaints is not yet finalized. The register Comments model is under preparation and will be shared by the PIU when ready. Develop and implement a program to enhance capacity-building on the new procurement Action Description decree. Source DLI# Responsibility Timing Timing Value Status Fiduciary Systems NA PIU/TGR Due Date 31-Jan-2024 Not Yet Due Completion A capacity building program on the new procurement decree for procurement officers and Measurement other stakeholders is delivered. The capacity building program has not yet started. The PIU will approach TGR to prepare Comments training sessions on the new decree to be delivered for the IAs. Action Description Include in the bidding documents an eligibility check clause. Source DLI# Responsibility Timing Timing Value Status Fiduciary Systems NA PIU/IAs Other Continuous Not Yet Due An eligibility check clause is included in bidding documents. Implementing agencies will Completion ensure that any person or entity debarred or suspended by the Bank is not awarded a Measurement contract, or otherwise allowed to participate in or benefit from the Program. PIU needs to reach out to CNCP to agree on an acceptable wording to be integrated in the Comments ‘’Reglements de consultation’’. 5. KEY DATES May 31, 2025 Page 8 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) Key Events Planned Actual Approval 09-Jun-2023 09-Jun-2023 Effectiveness 08-Jan-2024 08-Jan-2024 Mid-Term Review No. 01 24-Sep-2025 Operation Closing/Cancellation 30-Jun-2028 6. SYSTEMATIC OPERATIONS RISK-RATING TOOL Rating at Approval Last Approved Rating Risk Category Approval Package - ISR Seq. 02 - 02 Apr Proposed Rating 09 Jun 2023 2024 Political and Governance Moderate Moderate Moderate Macroeconomic Substantial Substantial Substantial Sector Strategies and Policies Moderate Moderate Moderate Technical Design of Project or Program Moderate Moderate Moderate Institutional Capacity for Implementation and Substantial Substantial Substantial Sustainability Fiduciary Substantial Substantial Substantial Environment and Social Substantial Moderate Moderate Stakeholders Substantial Substantial Substantial Overall Substantial Substantial Substantial May 31, 2025 Page 9 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) 7. RESULTS 7.1 PDO Indicators by PDO Outcomes Strengthen the institutional capacity to implement the NDC Baseline Actual (Previous) Actual (Current) Closing Period Indicator Name Value Month/Year Value Date Value Date Value Month/Year Public financing for measures No Jul/2023 No 04-Sep-2023 No 15-Aug-2024 Yes Jan/2028 (adaptation and Comments on The revision process of the NDC has been launched. The MTEDD and MEF are coordinating unconditional mitigation) in achieving targets to ensure proper alignment between the revised NDC and three-year budget plan. A the Revised NDC is approved roadmap has been prepared for such alignment; a methodology note is under finalization by the Government in the and will be presented at an inter-ministerial workshop in September 2024 Three-year Budget Program (Yes/No) No Jul/2023 No 04-Sep-2023 No 15-Aug-2024 Yes Dec/2027 The National Climate Comments on The National Climate Network Integration Procedures Manual is under finalization. Network is operational and achieving targets Diagnosis is ongoing at ABH level on the meteorological stations. delivers services to users New stations (beyond 171) have been connected to the DGM concentrator and verification (Yes/No) is underway. Enhance climate resilience of targeted vulnerable groups and ecosystems in the Program area Baseline Actual (Previous) Actual (Current) Closing Period Indicator Name Value Month/Year Value Date Value Date Value Month/Year 15,000.00 Jul/2023 15,000.00 03-Jul-2023 15,000.00 15-Aug-2024 1,000,000.00 Jun/2028 Farmers and their family members with effective Comments on During the last SPN mission, the option was discussed of not only counting farmers covered coverage with (AMO-TNS) achieving targets by AMO-TNS, but also including in the calculation farmers benefiting from AMO-TADAMON (Number) (acquired right) and other AMO coverages. The PIU/MEF will communicate to the WB the proposed adjustments, including the calculation and verification protocols (for DLI 7.3). Such May 31, 2025 Page 10 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) adjustments, if deemed acceptable by the WB, would be integrated through a restructuring of the Program. Meanwhile, it was agreed to maintain the focus on AMO-TNS only. Areas of vulnerable 0.00 Jul/2023 0.00 03-Jul-2023 0.00 15-Aug-2024 26,600.00 Dec/2027 ecosystems benefiting from Comments on First two campaigns of the vitroplants were carried out in Fall 2023 and Spring 2024. The climate-resilient land use achieving targets verification report for these two campaigns was sent by ANDZOA to MAPMDREF's Finance interventions (Hectare(Ha)) Department (DF) and IGA. It should include the area of oasis revitalized through vitroplants 7.2 Intermediate Results Indicators by Results Areas Integrate climate considerations into public finance management and financial sector policies Baseline Actual (Previous) Actual (Current) Closing Period Indicator Name Value Month/Year Value Date Value Date Value Month/Year The revised NDC 2026-2035 No Jul/2023 No 03-Jul-2023 No 15-Aug-2024 Yes Dec/2027 includes information on the Comments on The revision process of the NDC has been initiated; it will include the mainstreaming of gender aspect of the NDC achieving targets gender dimension (with support from GIZ TA) commitments (Yes/No) Public purchasers who have 0.00 Jul/2023 0.00 03-Jul-2023 0.00 15-Aug-2024 2,000.00 Jun/2028 received training on the Comments on Guide not yet available "green procurement" guide achieving targets (Number) Ministries/Public entities that 0.00 Jul/2023 0.00 03-Jul-2023 0.00 15-Aug-2024 5.00 Jun/2028 have applied green Comments on Criteria not yet defined/adopted procurement criteria achieving targets (Number) Women represented on the 0.00 Jul/2023 0.00 03-Jul-2023 60 15-Aug-2024 25.00 Dec/2027 technical committee/working Comments on The Committee was set up in december 2023. Out of the 10 members, 6 are women. group for the development achieving targets May 31, 2025 Page 11 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) of the green finance taxonomy governance framework (Percentage) No Jul/2023 No 03-Jul-2023 No 15-Aug-2024 Yes Dec/2027 Green sovereign bond issued Comments on Roadmap was prepared. A first draft of the Framework was shared with DTFE. (Yes/No) achieving targets Strengthen climate data systems Baseline Actual (Previous) Actual (Current) Closing Period Indicator Name Value Month/Year Value Date Value Date Value Month/Year Municipalities covered by an 15.00 Jul/2023 15.00 03-Jul-2023 15.00 15-Aug-2024 50.00 Jun/2028 observation station Comments on Information will be updated during the next Implementation support mission (currently (Percentage) achieving targets planned for October) Conventions signed between 0.00 Jul/2023 0.00 03-Jul-2023 2.00 15-Aug-2024 12.00 Dec/2027 the DGM and end users for Comments on The DGM has entered into two conventions with users (respectively in energy and access to processed climate achieving targets environment sectors) data (Number) No Jul/2023 No 03-Jul-2023 No 15-Aug-2024 Yes (every two Dec/2024 years starting in 2024, using the Regular publication of bi- information annual transparency reports contained in (Text) the MRV platform) Comments on First publication to be ready by end of 2024 achieving targets Engage with citizen on climate change issues Indicator Name Baseline Actual (Previous) Actual (Current) Closing Period May 31, 2025 Page 12 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) Value Month/Year Value Date Value Date Value Month/Year Campaigns on climate change 0.00 Jul/2023 0.00 03-Jul-2023 0.00 15-Aug-2024 5.00 Jun/2028 issues organized jointly with Comments on Discussions are ongoing with CESE and MEF to design the awareness campaigns on Climate the Economic, Social and achieving targets Change Environmental Council (CESE) (Number) People who participate in 0.00 Jul/2023 0.00 03-Jul-2023 0.00 15-Aug-2024 1,000,000.00 Jun/2028 campaigns on climate change Comments on Discussions are ongoing with CESE and MEF to design the awareness campaigns on Climate issues organized jointly with achieving targets Change the CESE (Number) Reinforce farmers' resilience to health risks, exacerbated by climate change Baseline Actual (Previous) Actual (Current) Closing Period Indicator Name Value Month/Year Value Date Value Date Value Month/Year Agreements signed between 0.00 Jul/2023 0.00 03-Jul-2023 0.00 15-Aug-2024 5.00 Dec/2027 the CNSS and the Agricultural Comments on The CNSS and the Milk Producer Association (Maroc-Lait) was signed but is pending MEF visa Interprofessional achieving targets Associations (Number) Agreement between CNSS No Jul/2023 No 03-Jul-2023 No 15-Aug-2024 Yes Dec/2027 and Crédit Agricole signed Comments on During the last mission, the WB was informed that a Convention was signed between Credit (Yes/No) achieving targets Agricole and CNSS in May 2022 Enhance climate resilience of vulnerable ecosystems Baseline Actual (Previous) Actual (Current) Closing Period Indicator Name Value Month/Year Value Date Value Date Value Month/Year Beneficiaries of small 0.00 Jul/2023 0.00 03-Jul-2023 1,460 15-Aug-2024 20,000.00 Dec/2027 hydraulic infrastructures in Comments on Two water subprojects have been completed and 11 small traditional hydraulic subprojects the targeted oasis areas achieving targets (Metfiyas) (Number) 0.00 Jul/2023 0.00 03-Jul-2023 0 15-Aug-2024 20,000.00 Dec/2027 May 31, 2025 Page 13 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) People benefiting from liquid Comments on Sanitation subprojects are ongoing and are planned to be completed in Q1 of 2025 sanitation projects in the achieving targets oasis areas (Number) Percentage of women 0.00 0.00 0.00 50.00 beneficiaries of liquid sanitation projects in targeted oasis areas (Percentage) Students benefiting from 0.00 Jul/2023 0.00 03-Jul-2023 400 15-Aug-2024 2,000.00 Dec/2027 environmental upgrading Comments on 11 schools have benefitted from an upgrade of the drinking water system (upgrade of the projects in oasis schools achieving targets sanitation system is ongoing) (Number) Percentage of girls 0.00 0.00 12 50.00 benefiting from environmental upgrading projects in oasis schools (Percentage) Jobs created by the service 0.00 Jul/2023 0.00 03-Jul-2023 0.00 15-Aug-2024 100.00 Dec/2027 cooperatives created or upgraded in the date palm value chain supported under the Solidarity Agriculture program (Number) 0% 0% 0% 50% (out of Percentage of women which a and youth in service minimum of cooperatives created or 10% for upgraded. (Text) women) No Jul/2023 No 03-Jul-2023 Yes 15-Aug-2024 Yes Dec/2027 May 31, 2025 Page 14 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) The new strategy of Comments on The new Strategy was adopted (Board minutes with attendance list and summary of strategy "Development of oasis areas achieving targets to be received from ANDZOA) and the argan tree 2022- 2030" adopted by the government (Yes/No) Small traditional hydraulic 0.00 Jul/2023 0.00 03-Jul-2023 11 15-Aug-2024 80.00 Dec/2027 infrastructures constructed Comments on 11 rainwater collection systems (Metfiyas) were constructed in the program area. to improve water resources achieving targets management in targeted oasis areas (Number) Awareness campaigns on 0.00 Jul/2023 0.00 03-Jul-2023 0.00 15-Aug-2024 10.00 Dec/2027 hygiene and water saving Comments on The selection process for the firm to prepare awareness material is ongoing. Campaign (Number) achieving targets should be 0.00 Jul/2023 0.00 03-Jul-2023 0.00 15-Aug-2024 2,000.00 Dec/2027 Urban/peri-urban forest Comments on Activity not yet started managed (Number) achieving targets Deploy Nature-Based Solutions to enhance climate resilience Baseline Actual (Previous) Actual (Current) Closing Period Indicator Name Value Month/Year Value Date Value Date Value Month/Year Women in forest 5.00 Jul/2023 5.00 03-Jul-2023 5.00 15-Aug-2024 25.00 Jun/2028 cooperatives, benefitting Comments on Activities not yet started from capacity building on achieving targets timber/non timber valorization (Percentage) Areas of urban/peri-urban 0.00 Jul/2023 0.00 03-Jul-2023 0.00 03-Jul-2023 2,000.00 Jun/2028 forests under NBS Comments on Activity not yet started management (Hectare(Ha)) achieving targets May 31, 2025 Page 15 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) 7.3 Disbursement Linked Indicators (DLI) Actual (Previous) Actual (Current) PBC Name Baseline Closing Period Value Date Value Date DLR 1.2(c) : Public financing for NDC revision process measures has been launched. (adaptation and NDC public Coordination unconditional NDC public financing 1:Revised NDC financing between MEF and mitigation) in the commitments and commitments are Value commitments and MTEDD to ensure Revised NDC is budget allocation are adequately costed budget allocation 08-Sep-2023 proper costing of 15-Aug-2024 approved by the not aligned and budgeted (Text) are not aligned revised NDC activities Government in Not Due and alignment with the Three-year 3-year budget plan Budget Program as defined in the POM, for FY2028 Allocated 0.00 0.00 5,000,000.00 Amount DLI allocation 35,000,000.00 2:Climate A benchmark Public procurement DLR#2.3: The Public procurement exercise was considerations are does not take Morocan does not take climate completed and TGR is embedded into climate Observatory of Value considerations 08-Sep-2023 working (with GIZ 15-Aug-2024 public procurement considerations Public sufficiently into and AFD support) on (Text) sufficiently into Procurement has account green criteria for Not Due account published a furniture CPS. A May 31, 2025 Page 16 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) working group TGR, statistical report CNCP, IMANOR, on green tenders MTEDD, AMEE will be established to support the preparation of the guideline Allocated 0.00 0.00 5,000,000.00 Amount DLI allocation 20,000,000.00 A roadmap has been No Sovereign Green No Sovereign Green prepared as well as a 3:Tools are in place Bonds have been Bonds have been draft Framework for to issue sovereign Value issued by the issued by the Sovereign green -- Green Bonds on Moroccan Moroccan Bonds, in close 08-Sep-2023 15-Aug-2024 international government. government. coordination with markets (Text) DTFE Not Due Allocated 0.00 0.00 0.00 Amount DLI allocation 25,000,000.00 DLR 4.1 has been achieved and is 4:A Green Finance pending verification. DLR#4.3: The Morocco does not Morocco does not Taxonomy is Selection process for green finance Value have a green finance have a green 08-Sep-2023 15-Aug-2024 adopted (Text) the firm to support taxonomy is taxonomy finance taxonomy Partially achieved the preparation of adopted. the Taxonomy has been launched May 31, 2025 Page 17 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) Allocated 0.00 0.00 20,000,000.00 Amount DLI allocation 25,125,000.00 32 new observation stations have been DLR#5.3: Eight (8) connected (pending end-users sectors verification). receiving 5:The National The observation The observation Conventions with the processed Climate Network is Value stations in Morocco stations in Morocco 10 ABH are under weather and operational and are not connected. are not connected. finalization. climate data 08-Sep-2023 15-Aug-2024 delivers services to Convention with 2 (scalable, users (Text) end-users have been baseline: 0 and Partially achieved signed (and pending end target: 8) verification) Allocated 0.00 0.00 8,000,000.00 Amount DLI allocation 33,000,000.00 The DLR#6.2: Three conceptualization of (3) sectors with the MRV platform on unconditional 6:The MRV platform Adaptation will be mitigation on NDC The MRV platform launched shortly. measures in the The MRV platform on implementation is on NDC During mission, it Revised NDC Value NDC implementation 08-Sep-2023 15-Aug-2024 operationalized implementation is was confirmed that included in the is not operational (Text) not operational the sectors to be MRV platform on Not Due considered under the NDC Climate operation for implementation. the MRV platform on (scalable, Mitigation would be : baseline: 4 in May 31, 2025 Page 18 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) Buildings, Industry 2026 and end and Wastes (other target: 7) four sectors are covered by the EU- financed operation) Allocated 0.00 0.00 5,000,000.00 Amount DLI allocation 20,000,000.00 Convention CNSS- Milk producter Associations has been signed and is pending MEF visa. DLR#7.3: 80 The CNSS-CA percent of 7:Farmers are convention was farmers in the effectively covered signed in May 2022 Program Area AMO-TNS coverage (before Program against health risks, effectively remains very low started preparation) including climate- covered under the Value among farmers (at 2 n/a 08-Sep-2023 and as such is not 15-Aug-2024 induced risks, AMO-TNS percent in March eligible under this through the AMO- (scalable, 2023) operation (would TNS (Text) baseline: 2 need to be adjusted Not Due percent and end under restructuring). target: 80 Ongoing discussion percent) with client on whether to expand beyond AMO-TNS and also include AMO-TADAMON May 31, 2025 Page 19 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) (and potentially other regimes) Allocated 0.00 0.00 30,000,000.00 Amount DLI allocation 45,000,000.00 DLR#8.1: one million palm trees distributed and Traditional oasis Traditional oasis 8:Traditional oasis planted for the ecosystems are ecosystems are First two campaigns ecosystems are revitalization of highly vulnerable to highly vulnerable to of vitroplant more resilient to traditional oases Value climate change and climate change and distribution are climate change and in the Targeted generate economic generate economic 08-Sep-2023 under verification by 15-Aug-2024 generate economic Oases Area opportunities for opportunities for IGA. opportunities for (scalable, their populations their populations local population baseline: 0 and (Text) end target: 1 million) Allocated 0.00 0.00 30,000,000.00 Amount DLI allocation 60,000,000.00 Two aquifer recharge infrastructure have Climate change is a Water resources 9:Water resources been completed and Value major threat to water are under threat in -- are preserved in the verified resources in oases oasis ecosystems 08-Sep-2023 targeted Oasis areas (disbursement under 15-Aug-2024 (Text) processing). Allocated 0.00 0.00 0.00 Amount May 31, 2025 Page 20 of 21 The World Bank Implementation Status & Results Report Morocco Climate Operation / Support to the Nationally-Determined Contribution (NDC) (P178763) DLI allocation 60,000,000.00 DLR#10.1: Four thousand and two Nature-based Nature-based Nature-based hundred (4,200) 10:Nature-based solutions are not solutions are not solutions are not hectares solutions are Value systematically used systematically used systematically used reforested in deployed to tackle to address climate to address climate 08-Sep-2023 to address climate 15-Aug-2024 selected priority climate challenges challenges challenges watersheds. vulnerabilities (Text) (scalable, end target: 4,200) Allocated 0.00 0.00 15,000,000.00 Amount DLI allocation 26,000,000.00 May 31, 2025 Page 21 of 21