PROCUREMENT PLAN (Textual Part) Project information: Brazil DGM for Indigenous People and Traditional Communities Phase 2 (P177957) Project Implementation agency: ALTERNATIVE AGRICULTURE CENTER OF THE NORTH OF MINAS GERAIS STATE Date of the Procurement Plan: 06/21/2023 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Brazil : Brazil DGM for Indigenous People and Traditional Communities Phase 2 PLAN General Information Country: Brazil 2023-06-21 Bank’s Approval Date of the Original Procurement Plan: 2024-07-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P177957 GPN Date: Project Name: Brazil DGM for Indigenous People and Traditional Communities Phase 2 Loan / Credit No: TF / B9891 Alternative Agriculture Center of the North of Minas Gerais State Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-CAA-372026-GO-RFQ / A quisição de gêneros alimentí cios para reunião da Coorden ação Regional da FUNAI de P Sustainable Community Sub Solicitação de Cot Single Stage - One E Implementaç aulo Afonso dos dias 25 a 30 TF / B9891 Posterior Limited 1,250.00 0.00 2023-07-18 2023-07-21 2023-08-20 projects ações nvelope ão Pendente de julho na Aldeia Tuxá Kiona há, para o levantamento das demandas das aldeias do Oe ste da Bahia. Com participaç ão 50 pesssoas de 15 aldeias . SUB 432 01/2023 / Aquisição de matérias de construção e irrigação para revitalização d o sistema de irrigação ancest Sustainable Community Sub Solicitação de Cot Single Stage - One E Implementaç ral da “água rolada” com ree TF / B9891 Posterior Limited 5,824.13 0.00 2023-12-08 2023-12-23 2024-06-20 projects ações nvelope ão Pendente struturação dos canais de ág ua e plantação de mudas nat ivas, na aldeia Indígena Xakri aba, no município São João d as Missões – MG. SUB 432 10/2023 / Aquisição de equipamentos agricolas p ara fortalecer a energia prod Em fase de I Sustainable Community Sub Solicitação de Cot Single Stage - One E utiva de trabalho e a colabor TF / B9891 Posterior Limited 5,831.14 0.00 mplementaç 2023-12-06 2024-03-04 2023-12-19 2024-06-16 projects ações nvelope ação interna, coletiva e solid ão ária, na aldeia Indígena Xakri aba, no município de São Joã o das Missões – MG. SUB 463 08/2023 / Aquisição de mudas de reflorestament o, para a recuperação de 2,5 Sustainable Community Sub Solicitação de Cot Single Stage - One E Implementaç 6 hectares de Áreas de Prese TF / B9891 Posterior Limited 6,679.95 0.00 2023-12-09 2024-01-04 2024-07-02 projects ações nvelope ão Pendente rvação Permanente (APP), da Comunidade Quilombola Boa Nova do município de Profess or Jamil - GO. SUB 384 05/2023 / Aquisição de materiial para irrigação p ara implementação de roça c omunitária estruturada com i Sustainable Community Sub Solicitação de Cot Single Stage - One E Implementaç TF / B9891 Posterior Limited 6,748.46 0.00 2023-12-13 2023-12-30 2024-06-27 rrigação e sistema de abaste projects ações nvelope ão Pendente cimento hídrico estruturado, no Quilombo Ribeirão da Mut uca, Nossa Senhora do Livra mento - MT SUB 364 06/2023 / Aquisição de equipamentos e insumos para a comercialização e fun Sustainable Community Sub Solicitação de Cot Single Stage - One E Implementaç TF / B9891 Posterior Limited 12,412.47 0.00 2023-12-16 2024-01-05 2024-07-03 cionamento dos empreendim projects ações nvelope ão Pendente entos comunitários, na aldeia Indígena do Brejão - T.I Nioaq ue - MS SUB 412 - 01/2023 / Aquisiç ão de materiais de construçã o e ferramentas para estrutu Sustainable Community Sub Solicitação de Cot Single Stage - One E Implementaç TF / B9891 Posterior Limited 5,568.00 0.00 2024-01-16 2024-01-31 2024-07-29 rar os espaços que servem c projects ações nvelope ão Pendente omo turismo de Base Comuni tária na Resex do Delta do P arnaíba (MA). SUB 439 001-2024 / Aquisiç ão de materiais hidraulicos e equipamentos de irrigação p ara implementação de siste Sustainable Community Sub Solicitação de Cot Single Stage - One E Implementaç TF / B9891 Posterior Limited - National 9,416.00 0.00 2024-05-08 2024-05-23 2024-08-21 ma de distribuição hidrica e projects ações nvelope ão Pendente m 6 aldeias e implementação de horta de comunitaria Alde ia Três Pedras,Território Bacu rizinho, Grajaú - MA. SUB 388 001/2024 / Aquisiçã o de equipamentos de inform ática para estruturação da as Sustainable Community Sub Solicitação de Cot Single Stage - One E Implementaç TF / B9891 Posterior Limited - National 7,837.20 0.00 2024-06-11 2024-07-02 2024-08-31 sociação e dos meios de com projects ações nvelope ão Pendente unicação, na Aldeia Dolowikw a/Kotakwinãkwa, Vilhena – R O. NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-CAA-368333-NC-RFQ - 02 5-2023 / Contração de empre sa para realização da 3º Reu Capacity Building, Communi Em fase de I Solicitação de Cot Single Stage - One E nião do CGN em Brasilia DF, TF / B9891 cation and Knowledge Excha Posterior Limited 6,263.00 0.00 mplementaç 2023-06-21 2023-06-23 2023-07-13 ações nvelope com fornecimento de aliment nge ão ação, hospedagem e sala de reuniões, para 23 pessoas co m duração de 2 dias. Page 1 BR-CAA-376236-NC-RFQ / Pr estação de serviço de forneci mento de alimentação para 4 Sustainable Community Sub Solicitação de Cot Single Stage - One E Implementaç 5 participantes durante oficin TF / B9891 Posterior Limited 6,120.00 0.00 2023-08-11 2023-08-17 2023-09-16 projects ações nvelope ão Pendente a de elaboração dos subproje tos realizada em Montes Clar os/MG com carga horária de 40h. BR-CAA-376244-NC-RFQ / Pr estação de serviço de transp orte para 45 participantes du Sustainable Community Sub Solicitação de Cot Single Stage - One E Implementaç TF / B9891 Posterior Limited 1,225.00 0.00 2023-08-11 2023-08-17 2023-09-16 rante oficina de elaboração d projects ações nvelope ão Pendente os subprojetos realizada em Montes Claros/MG com carga horária de 40h. REDE 479 - BR-CAA-380835- NC-RFQ / Prestação de serviç o de pré-produção, produção Capacity Building, Communi Solicitação de Cot Single Stage - One E Implementaç e realização e pós-produção TF / B9891 cation and Knowledge Excha Posterior Limited 12,250.00 0.00 2023-09-06 2023-09-10 2023-12-09 ações nvelope ão Pendente do X Encontro e Feira dos Po nge vos do Cerrado. Será realizad o em Brasilia de 13 a 16/09/2 023. BR-CAA-398488-NC-RFQ AU DITORIA / Contratação de em presa especializada, para rea Project Management, Monito Solicitação de Cot Single Stage - One E Implementaç TF / B9891 Posterior Limited 20,000.00 0.00 2024-01-03 2024-01-24 2025-04-18 lização de auditoria externa ring and Evaluation ações nvelope ão Pendente na documentação relativa ao projeto, nos exercícios de 20 22,2023, 2024 e 2025. 347 - FECHO DE PASTO / De senvolver acoes de manejo p reventivo e protetivo na com Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç TF / B9891 Posterior Open - National 9,100.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 unidade tradicional de Fecho projects rtas nvelope ão Pendente de Pasto Clemente para man utencao da biodiversidade e a defesa territorial 355 - VYTY CATI / Realizar ac oes compartilhadas de prote Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç cao do territorio indigena Kri TF / B9891 Posterior Open - National 9,100.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 projects rtas nvelope ão Pendente kati para reduzir impactos so cioambientais e proteger a s ociobiodiversidade. 358 - APOINKK / Promover pr otecao do Territorio, Sustent Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç abilidade nos moldes Tradici TF / B9891 Posterior Open - National 9,100.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 projects rtas nvelope ão Pendente onais fortalecendo e valoriza ndo a Cultura Kraho-Kanela. 364 - BREJAO / Fortaler o gru po apicultores existente com a expansao da atividade de a Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç picultura e o comeco da meli TF / B9891 Posterior Open - National 22,000.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 projects rtas nvelope ão Pendente ponicultura como fontes de r enda para subsistencia das f amilias e a permanencia de i ndigenas na aldeia. SUB 375 - KARAJA / Implanta cao de sistemas agroflorestai s para producao de alimento s garantindo a seguranca ali Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç TF / B9891 Posterior Open - National 9,100.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 mentar e nutricional, e a impl projects rtas nvelope ão Pendente antacao de apiario para prod ucao de mel, promovendo a protecao e a conservacao do s recursos naturais. 378 - AMANU / Estruturar a I Casa Comunitaria do Coco M acaúba com instalacoes eletr Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç icas e hidraulicas para meca TF / B9891 Posterior Open - National 9,100.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 projects rtas nvelope ão Pendente nizacao dos processos, geran do aumento na producao e m elhora na qualidade do benef iciamento dos produtos. 382 - ASMUBIP / Fortalecer a cadeia produtiva da farinha d e mesocarpo de coco babacu Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç TF / B9891 Posterior Open - National 9,100.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 organizando capacitando gru projects rtas nvelope ão Pendente pos em boas praticas para us o sustentavel e geracao de r enda. 384 - MUTUCA / Fortalecer a s atividades produtivas quilo mbolas, valorizacao social, c Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç TF / B9891 Posterior Open - National 9,100.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 ultural, economica e organiz projects rtas nvelope ão Pendente acional dos produtos quilomb olas com o manejo sustentav el da biodiversidade. 387 - RIACHO DOS BURITIS / Promover a recuperacao de u ma area de vereda na Aldeia Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç Riacho dos Buritis para aume TF / B9891 Posterior Open - National 9,100.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 projects rtas nvelope ão Pendente ntar a disponibilidade hidrica e preservar a biodiversidade e estruturar ponto de produc ao de farinha na comunidade 388 - ENAWANE / Estruturar a aldeia com equipamentos d e informatica, telecomunicac ao, audio visual e acesso inte Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç TF / B9891 Posterior Open - National 22,000.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 gral a rede de computadores projects rtas nvelope ão Pendente (internet) para garantir a co municacao, monitoramento e seguranca do povo indigena Enawene-Nawe. 397 - OECA / Garantir a cons ervacao e cuidado com o terr itorio e sua biodiversidades, Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç TF / B9891 Posterior Open - National 22,000.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 protegendo sua fitofisionomi projects rtas nvelope ão Pendente a em area de transicao entre Cerrado, Amazonia Legal e pl anicie do Rio Araguaia. 401 - XAVANTE WARA / Pro mover a recuperacao e a pro Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç tecao dos recursos naturais e TF / B9891 Posterior Open - National 9,100.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 projects rtas nvelope ão Pendente garantir a fiscalizacao da terr a Indigena Sangradouro/Volt a Grande. Page 2 404 - ATAWO / Implantar o S istema Agroflorestal na aldei a Igu I´o - TI Santana e difun dir o conhecimento a tradicio Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç TF / B9891 Posterior Open - National 22,000.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 nal do manejo de sistemas a projects rtas nvelope ão Pendente groflorestais, potencializando o uso sustentavel do ecossist ema e a melhorando autoesti ma dos Bakairi 412 - APECIC / Realizar acoe s para continuar a consolidac Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç TF / B9891 Posterior Open - National 9,100.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 ao do Turismo de Base Comu projects rtas nvelope ão Pendente nitaria na Resex do Delta do Parnaiba (MA). 417 - TAPAGUIA / Proporcion ar a vivencia do trabalho em equipe na recuperacao de du Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç as outras nascentes e a prod TF / B9891 Posterior Open - National 9,100.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 projects rtas nvelope ão Pendente ucao de alimentos atraves de uma horta orgnica, alem da r eforma do telhado e piso da associacao. 422 - FULNI-O / Aumentar a area plantada para atender a demanda do consumo da ald Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç eia; Melhorar a eficiencia da i TF / B9891 Posterior Open - National 9,100.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 projects rtas nvelope ão Pendente rrigacao implantando o siste ma de automacao; Reduzir o gasto com a energia das cas as da aldeia com placas solar es. 426 - CROWRAKO / Capacita cao sobre a defesa da sociobi odiversidade e incentivo no d Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç esenvolvimentos de novos pr TF / B9891 Posterior Open - National 22,000.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 projects rtas nvelope ão Pendente ojetos e acoes que contribua m para autonomia, autogest ao e autodeterminacao do po vo Kraho. 432 - ROMZA / Fortalecer inc lusao produtiva com a promo cao de atividades sustentave is, respeitando os principios Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç TF / B9891 Posterior Open - National 22,000.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 de organizacao social indigen projects rtas nvelope ão Pendente a Xakriaba com a valorizacao da agricultura familiar, a part ir de acoes praticas de produ cao e sustentabilidade. 439 - TRES PODERES / Usar sistemas agroecologicos na p Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç roducao animal, vegetal e so TF / B9891 Posterior Open - National 22,000.00 0.00 2023-09-04 2023-11-20 2023-11-20 2023-09-09 2024-01-29 2024-02-28 2024-04-03 2025-09-25 projects rtas nvelope ão Pendente cioambientais para fortalecer e garantir a soberania alimen tar. 454 - MALHADA GRANDE / In tercambio de tecnicas artesa nais e estabelecimento de co Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç smeticos, panificados e colec TF / B9891 Posterior Open - National 22,000.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 projects rtas nvelope ão Pendente oes textil a partir da qualifica cao do processo criativo das pecas e venda regional das mesmas. 463 - PROFESSOR JAMIL / Re cuperar 2,56 hectares deare as de Preservacao Permanen Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç te (APP), da Comunidade Quil TF / B9891 Posterior Open - National 22,000.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 projects rtas nvelope ão Pendente ombola Boa Nova e promove r a sustentabilidade ambient al, social e economica na co munidade 464 - BONSUCESSO / Imple mentar horta e quintal na Ca sa Familiar Rural Quilombola Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç TF / B9891 Posterior Open - National 22,000.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 de Bom Sucesso, e construir projects rtas nvelope ão Pendente formas resilientes de sobrevi vencia frente as mudancas cl imaticas 406 - MIQCB / Apoio Instituci onal do MIQCB com fortaleci Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç mento da comercializacao do TF / B9891 Posterior Open - National 20,000.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 projects rtas nvelope ão Pendente s produtos do Coco Babacu e aumento da renda das mulhe res quebradeiras de coco. 477 - APOINME / Planejamen to estrategico da APOINME c om a finalidade de estruturar Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç TF / B9891 Posterior Open - National 20,000.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 o plano politico orientador do projects rtas nvelope ão Pendente departamento, plano de acao e projeto estruturante da eq uipe e atividades 478 - MOPIC / Fortalecer a m obilizacao e participacao das mulheres indigenas do Cerra do em agendas politicas do Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç TF / B9891 Posterior Open - National 20,000.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 movimento indigena nacional projects rtas nvelope ão Pendente , contribuindo para o protago nismo das mulheres indigena s e para o fortalecimento poli tico da MOPIC 479 - REDE CERRADO / Reali zar o X Encontro e Feira dos Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç TF / B9891 Posterior Open - National 20,000.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 Povos do Cerrado com o obje projects rtas nvelope ão Pendente tivo de divulgar o Cerrado e s eus povos. 480 - CONAQ / Garantir estr utura para a realizacao do 2° Aquilombar, planejamento de estrutura e logistica e pagam Sustainable Community Sub Solicitação de Ofe Single Stage - One E Implementaç TF / B9891 Posterior Open - National 20,000.00 0.00 2023-09-04 2023-09-09 2023-10-21 2023-11-20 2023-12-25 2024-06-22 ento de algumas despesas n projects rtas nvelope ão Pendente a execucao do Aquilombar n a continuidade das denúncia s e garantia dos direitos dos quilombolas CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual REDE 479 02/2023 / Contrat ação de profissional técnico especializado de assessoria j Sustainable Community Sub Seleção Direta de Implementação P urídica junto à Rede Cerrado TF / B9891 Posterior Direct - National 5,725.00 0.00 2023-12-03 2023-12-09 2023-12-22 2024-08-18 projects Consultores endente com o intuito de dinamizar a ções junto ao Grupo de Traba lho de Incidência Política e a os Núcleos Regionais da Red e. Page 4