Procurement Plan I. General 1. Project Information Country : Bhutan Borrower : Project Name : Food Security and Agriculture Productivity Project Loan Credit No. : P 1555513 2. Bank’s Approval Date of the Procurement Plan : October 20, 2016 In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. II. Goods, Works and Non consulting Services 1. Prior Review Threshold Method of Thresholds for Method Prior Review Procurement (USD equivalent) Threshold (USD) ICB (Goods) > 200,000 USD All contract above USD 100,000 RFB ( Goods) > USD 30,000 and up to USD 200,000 RFQ (Goods) Up to USD 30,000 ICB (Works) > 1.5 million All contract above RFB (Works) > 50,000 and up to USD USD 300,000 1.5 million RFQ (Works) Up to USD 50,000 ICB (Non- > 200,000 USD All contract above Consulting USD 100,000 Services) RFB (Non- < 200,000 USD Consulting Services) Direct Contracting No Threshold; meet paragraph 6.8, 6.9 and 6.10 of regulations Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified depending on the risk assessment and implementation of mitigation measures. In the case of contracts subject to prior review, before granting / agreeing to (a) a material extension of the stipulated time for performance of a contract; or (b) any substantial modification or waiver of the scope of services or other significant changes to the terms and conditions of such that the contract, including issuing; or (c) any change variation order or orders under such contract amendment (except in cases of extreme urgency) which would in aggregate, singly or combined with all variation orders or amendments previously issued, increase the original contract amount of the contract by more than 15% (fifteen percent); or (d) the proposed termination of the original price contract, the Borrower shall seek the Bank’s no objection to the proposed extension, modification, or change order. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Prequalification Not Applicable 3. Reference to Project operational/Procurement Manual Standard Bidding Documents agreed between Project and Bank will be used for all works, consultancy and goods procurements. 4. Any Other Special Procurement Arrangements: National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. Requirements for national open competitive procurement include the following: a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. contracts with an appropriate allocation of responsibilities, risks, and liabilities; e. publication of contract award information; f. rights for the Bank to review procurement documentation and activities; g. an effective complaints mechanism; and h. maintenance of records of the Procurement Process.. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. II. Domestic Preference. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable The bid evaluation will be carried out as per agreed timeline in the Procurement Activity Schedule III. Selection of Consultant 1. Prior Review Threshold Method of Threshold (USD Prior Review Threshold Procurement Equivalent) (a) Quality and Cost No threshold All Contracts above USD Based Selection 70,000 for Firms; and (b) Quality Based No threshold above USD 50,000 for Selection Individuals (c) Selection Made No threshold Under a Fixed Budget (d) Least Cost Selection No threshold (e) Selection Based on < 100,000 Consultant’s Qualifications (f) Single Source As per Consultant Selection of firms Guidelines Para 3.9 (g) Selection of No threshold Individual Consultants Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified. In the case of contracts subject to prior review, before agreeing to: (a) an extension of the stipulated time for performance of a contract; (b) any substantial modification of the scope of services, substitutions of key experts, or other significant changes to the terms and conditions of the contract; or (c) the proposed termination of the contract, the Borrower shall seek the Bank’s no objection. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Short List comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than USD 200,000 equivalent per contract, may comprise entirely of national consultants. PROCUREMENT Bhutan : Food Security and Agriculture Productivity Project PLAN General Information Country: Bhutan 2020-05-28 Bank’s Approval Date of the Original Procurement Plan: 2024-07-14 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P155513 GPN Date: 2017-11-30 Project Name: Food Security and Agriculture Productivity Project Loan / Credit No: TF / A4224, TF / B6044 Sarpang Dzongkhag Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BT-SD-175584-CW-DIR / Con struction of Market structure Component 3: Enhancing Ac 2021-01-1 TF / A4224 Post Direct Selection Direct 6,000.00 5,515.68 Completed 2020-06-05 2019-11-02 2020-06-10 2019-11-02 2020-07-15 2019-11-10 at Samtenling, under Samten cess to Markets 1 ling Gewog, under Sarpang D zongkhag. National Procure BT-SD-236755-CW-RFQ / Co ment Document - Component 3: Enhancing Ac Request for Quota Single Stage - One E 2022-04-0 nstruction of Field Packing H TF / A4224 Post Open - National 1 Envelope proce 6,500.00 0.00 Canceled 2021-08-10 2021-10-05 cess to Markets tions nvelope 3 ouse at Gakidling Gewog, Sar ss (Non Bank-SPD pang Dzongkhag. ) BT-SD-307695-CW-RFQ / Co nstruction of field pack house Component 3: Enhancing Ac Request for Quota Single Stage - One E Other (with field f 2023-05-3 TF / B6044 Post Open - National 12,680.00 0.00 Completed 2022-10-06 2022-12-01 2022-09-21 at Ratey Pani to be owned by cess to Markets tions nvelope or explanation) 0 the identified Farmers Group (Sl No.3.1.1) BT-SD-397459-CW-RFB / Mai ntenance of Rateykhola Irriga tion Scheme at Chhokorling Component 2: Enhancing Fa Single Stage - One E Other (with field f 2024-07-2 TF / A4224 Post Request for Bids Open - National 55,700.00 0.00 Completed 2024-01-31 2024-01-17 2024-02-05 2024-01-25 2024-03-06 2024-02-08 2024-03-26 2024-02-27 2024-04-24 under Dekidling Gewog and rmer Productivity nvelope or explanation) 3 mega irrigation channel at Lh aring ,Sarpang Dzongkhag GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BT-SD-175583-GO-DIR / Proc urement of seeds: 4500 pack ets of vegetable seeds, 1500 Component 2: Enhancing Fa TF / A4224 Post Direct Selection Direct 23,500.00 16,152.26 Completed 2020-06-10 2019-07-01 2020-06-15 2019-07-31 2020-07-20 2019-08-14 2021-01-16 2020-04-17 0 kg potato seeds, 8000 kgs rmer Productivity of paddy seeds to be issued t o the project Gewogs under t he Dzongkhag. BT-SD-193720-GO-RFQ / Pro curement of Mulching plastic, Component 2: Enhancing Fa Request for Quota Single Stage - One E TF / A4224 Post Open - National 18,000.00 23,073.03 Completed 2020-11-04 2020-12-30 2020-11-18 2021-06-28 2021-02-20 Sintex (1000), Drip Irrigation, rmer Productivity tions nvelope water cane to be issued to P roject Gewogs. BT-SD-193721-GO-RFQ / Pro curement of Fabricated polyh ouse (52 sets), low cost poly Component 2: Enhancing Fa Request for Quota Single Stage - One E TF / A4224 Post Open - National 77,000.00 89,872.62 Completed 2020-11-03 2020-12-29 2020-11-18 2021-06-27 2021-02-20 house plastic sheet (185 nos) rmer Productivity tions nvelope and fencing net to be issued to farmers of the Project Gew ogs. BT-SD-193719-GO-DIR / Proc urement of seeds (Mixed Veg etable=13500 Pkts, Seed pot Component 2: Enhancing Fa ato=19500 kg, Improved pad TF / A4224 Post Direct Selection Direct 19,000.00 11,607.82 Completed 2020-11-26 2021-03-01 2020-12-01 2021-03-03 2021-01-05 2021-03-19 2021-07-04 2021-03-19 rmer Productivity dy seed=8800 kg, Green Ma nuring=900 kg) to be issued to farmers of the Project Gew ogs. BT-SD-229555-GO-RFQ / Pro curement of agriculture tools and equipments-50 rolls of M Component 2: Enhancing Fa Request for Quota Single Stage - One E ulching plastic, 10 Nos of wat TF / A4224 Post Open - National 23,500.00 0.00 Canceled 2021-07-20 2021-09-14 2022-03-13 rmer Productivity tions nvelope er Sintex, 150 sets of Drip Irri gation, 150 rolls of Fencing n et, 12 Nos of Plastic line wate r harvesting BT-SD-229556-GO-RFB / Pro curement of Fabricated poly Component 2: Enhancing Fa Single Stage - One E TF / A4224 Post Request for Bids Open - National 60,000.00 0.00 Canceled 2021-07-15 2021-07-20 2021-08-31 2021-09-30 2021-11-04 2022-05-03 house-50 sets to be issued to rmer Productivity nvelope project Gewogs under the Dz ongkhag. BT-SD-229557-GO-RFQ / Pro curement of mini power tiller Component 2: Enhancing Fa Request for Quota Single Stage - One E TF / A4224 Post Open - National 11,971.00 22,525.72 Completed 2022-01-04 2022-01-25 2022-04-16 2022-06-30 2022-04-25 s to be issued to project Gew rmer Productivity tions nvelope ogs under the Dzongkhag BT-SD-229558-GO-DIR / Proc Component 2: Enhancing Fa urement of construction mat TF / A4224 Post Direct Selection Direct 1,942.00 1,694.94 Completed 2022-01-20 2022-03-23 2022-01-21 2022-03-24 2022-02-19 2022-04-07 2022-04-20 2022-05-26 rmer Productivity erials for bio-digester (cemen t and bricks). BT-SD-229553-GO-DIR / Proc urement of assorted seeds-V Component 2: Enhancing Fa egetable, Seed Potato, Paddy TF / A4224 Post Direct Selection Direct 26,000.00 22,779.59 Completed 2021-09-15 2021-07-19 2021-09-20 2021-08-03 2021-10-25 2022-03-24 2022-04-23 2022-05-12 rmer Productivity seed(Improved) and Ginger Rhizom to be issued to projec t Gewogs. BT-SD-229559-GO-RFQ / Pro curement of Electric fencing Component 2: Enhancing Fa Request for Quota Single Stage - One E TF / A4224 Post Open - National 8,000.00 6,363.47 Completed 2021-07-20 2021-09-14 2021-12-13 2022-03-13 2021-12-29 materials ( GI Wire, HDPE Pip rmer Productivity tions nvelope e, Plastic poles, Energizer, To ols) BT-SD-229560-GO-RFQ / Pro Component 2: Enhancing Fa Request for Quota Single Stage - One E curement of food processing TF / A4224 Post Open - National 4,500.00 0.00 Canceled 2021-07-20 2021-09-14 2022-03-13 rmer Productivity tions nvelope Untensils and packing equip ments. Page 1 BT-SD-267274-GO-RFQ / Pro curement of CGI sheets and r Component 2: Enhancing Fa TF / A4224 Post Direct Selection Direct 550.00 365.32 Completed 2022-01-25 2022-03-23 2022-01-27 2022-03-24 2022-02-13 2022-03-28 2022-04-14 2022-05-12 oofing screws for constructio rmer Productivity n of bio-digester for project g ewogs BT-SD-307674-GO-RFQ / Pro curment of 17 nos. (2000 Ltr s.) of water storage tank to s Component 2: Enhancing Fa Request for Quota Single Stage - One E TF / B6044 Post Limited 2,540.00 0.00 Completed 2022-10-25 2022-12-27 2022-12-20 2023-04-12 2023-02-18 upport the existing drip irriga rmer Productivity tions nvelope tion system used by the Far mers of Shompangkha gewo g (Sl No.2.1.3) BT-SD-307677-GO-RFQ / Pro curement of 20 nos. of wome n- friendly mini-tillers to be is Component 2: Enhancing Fa Request for Quota Single Stage - One E TF / B6044 Post Limited 8,875.00 0.00 Canceled 2022-11-30 2023-01-25 2023-04-25 sued to the farmers of Dekili rmer Productivity tions nvelope ng & Samtenling gewogs on cost sharing basis (Sl No.2.3. 9) BT-SD-307678-GO-DIR / Proc urement of materials for elec Component 2: Enhancing Fa tric fencing including HDPE Pi TF / B6044 Post Direct Selection Direct - National 6,345.00 0.00 Completed 2022-12-11 2022-12-02 2022-12-16 2022-12-05 2023-01-20 2022-12-21 2023-04-20 2023-02-24 rmer Productivity pe to be installed under Gaki dling &Tareythang gewogs (S l No.2.3.10) BT-SD-307680-GO-RFB / Pro curement of 70 nos. of poly h Component 2: Enhancing Fa Single Stage - One E ouses to be issued to the far TF / B6044 Post Request for Bids Open - National 60,345.00 0.00 Completed 2022-10-18 2022-11-04 2022-10-23 2022-12-07 2022-12-04 2022-12-05 2023-01-03 2023-01-30 2023-02-07 2023-02-24 2023-05-08 rmer Productivity nvelope mers of 6 Project Gewogs on cost sharing basis (Sl No.2.3. 7) BT-SD-307682-GO-DIR / Proc urement of cement for the co nstruction of bio-digesters to Component 2: Enhancing Fa TF / B6044 Post Direct Selection Direct - National 510.00 0.00 Completed 2022-12-02 2023-04-10 2022-12-07 2023-04-11 2023-01-01 2023-04-19 2023-04-01 the selected farmers of Sho rmer Productivity mpangkha & Dekiling gewog s for promotion of organic far ming (2.3.8) BT-SD-307685-GO-RFQ / Pro curement of materials (CGI s heets and local bricks) for th Component 2: Enhancing Fa Request for Quota Single Stage - One E e construction of bio-digester TF / B6044 Post Limited 5,705.00 0.00 Completed 2022-12-25 2022-12-27 2023-02-19 2023-04-04 2023-05-20 rmer Productivity tions nvelope s to the selected farmers of Shompangkha & Dekiling ge wogs for promotion of organi c farming (Sl No.2.3.8) BT-SD-307687-GO-RFQ / Pro curement of 70 nos. of Drip i rrigation sets to be supplied t Component 2: Enhancing Fa Request for Quota Single Stage - One E TF / B6044 Post Limited 6,975.00 0.00 Completed 2022-10-17 2022-12-27 2022-12-12 2023-03-22 2023-03-12 o the farmers of Shompangk rmer Productivity tions nvelope ha Gakidling, Umling & Tare ythangin Gewogs on cost sha ring basis (Sl. No.2.1.2) BT-SD-307688-GO-RFQ / Pro curement of 300 nos. plastic mulching to be supplied to fa rmers of Shompangkha, Deki Component 2: Enhancing Fa Request for Quota Single Stage - One E ling, Umling & Tareythang Ge TF / B6044 Post Limited 13,950.00 0.00 Canceled 2022-11-04 2022-12-27 2022-12-30 2023-03-30 rmer Productivity tions nvelope wogs (Sl No.2.3.1) & 100 roll s of fencing net to be supplie d to farmers of Shompangkh a , Gakidling & Dekilingin Ge wogs (Sl No.2.3.5) BT-SD-307690-GO-RFQ / Pro curement of 20 nos of Hedge cutter to be supplied to farm Component 2: Enhancing Fa Request for Quota Single Stage - One E TF / B6044 Post Limited 6,340.00 0.00 Completed 2022-10-08 2022-12-27 2022-12-03 2023-06-30 2023-03-03 2023-07-05 ers of Gakidling & Dekiling G rmer Productivity tions nvelope ewogs promote gender friend ly technology (Sl No.2.3.11) BT-SD-307691-GO-DIR / Proc urement of hybrid vegetable seeds -Chill, Cauliflower, Cab bage, Onion, Tomato to be s Component 2: Enhancing Fa TF / B6044 Post Direct Selection Direct - National 15,220.00 0.00 Completed 2022-09-14 2022-08-15 2022-09-19 2022-08-09 2022-10-14 2023-03-24 2023-01-12 2023-05-30 upplied to the farmers of all rmer Productivity 6 project Gewogs (Sl No.2.3. 2) & hybrid paddy seeds to s upplied to farmers of Shomp angkha & Dekiling Gewogs (S l No.2.3.3) BT-SD-307693-GO-DIR / Proc urement of Seed Potato to su Component 2: Enhancing Fa TF / B6044 Post Direct Selection Direct - National 2,535.00 0.00 Completed 2022-11-02 2022-09-11 2022-11-07 2022-09-12 2022-12-02 2022-09-28 2023-01-31 2022-12-30 pplied to farmers of all 6 proj rmer Productivity ect Gewogs (Sl No.2.3.6) BT-SD-312082-GO-DIR / Proc urement of 15 nos. of electric Component 3: Enhancing Ac dryer to be supplied to farme TF / B6044 Post Direct Selection Direct - National 2,030.00 0.00 Canceled 2022-12-30 2023-01-04 2023-01-29 2023-03-30 cess to Markets rs of Shompangkha Gewog o n cost sharing basis (Sl No.3. 1 (b).1) BT-SD-323750-GO-DIR / Proc urement of black pepper see Component 2: Enhancing Fa dling to enhance black peppe TF / B6044 Post Direct Selection Direct - National 1,300.00 0.00 Completed 2023-06-25 2023-05-12 2023-06-30 2023-05-17 2023-07-17 2023-05-26 2023-08-31 rmer Productivity r production capacity of the f armers in Shompangkha gew og (Sl.no. 2.3.4) BT-SD-330595-GO-RFB / Pro curement of 60 nos. of wome n- friendly mini-tillers to be is Component 2: Enhancing Fa Single Stage - One E TF / A4224 Post Request for Bids Open - National 33,750.00 0.00 Completed 2023-03-31 2023-01-06 2023-04-10 2023-01-09 2023-05-22 2023-02-07 2023-06-21 2023-02-27 2023-07-26 2023-03-23 2023-10-24 2023-05-18 sued to the farmers of Dekili rmer Productivity nvelope ng & Samtenling gewogs on cost sharing basis (Sl No.2.3. 9) BT-SD-379558-GO-RFQ / Pro curement of SMART irrigation controller set & Accessories Component 2: Enhancing Fa Request for Quota Single Stage - One E materials to support establis TF / B6044 Post Open - National 20,700.00 0.00 Completed 2024-01-05 2024-02-21 2023-11-23 2024-05-21 2024-02-14 rmer Productivity tions nvelope hment of Micro- Irrigation sys tems in farmers field or existi ng poly house to attain water -use efficiency (2.1.2) BT-SD-379559-GO-RFB / Pro curement of women friendly Component 2: Enhancing Fa Single Stage - One E TF / B6044 Post Request for Bids Open - National 55,000.00 0.00 Completed 2023-12-31 2023-09-11 2024-01-05 2023-09-19 2024-02-04 2023-10-12 2024-02-19 2023-11-13 2024-03-25 2023-12-01 2024-06-23 2024-06-11 mini power tillers (2.3.7), sec rmer Productivity nvelope ateurs, pruning saw and gras s cutter (2.3.8) Page 2 BT-SD-379560-GO-DIR / Proc urement of cement & sand fo Component 2: Enhancing Fa TF / B6044 Post Direct Selection Direct - National 1,600.00 0.00 Completed 2023-12-31 2023-12-27 2024-01-05 2023-12-27 2024-01-30 2023-12-28 2024-03-15 2024-03-14 r the construction of bio-dige rmer Productivity sters for Organic agriculture promotion (2.3.6) BT-SD-379561-GO-RFQ / Pro curement of materials (CGI s Component 2: Enhancing Fa Request for Quota Single Stage - One E heets and local bricks) for th TF / B6044 Post Limited 5,500.00 0.00 Completed 2024-01-05 2023-09-08 2024-02-20 2023-11-23 2024-04-20 2024-01-24 rmer Productivity tions nvelope e construction of bio-digester s for Organic agriculture pro motion (2.3.6) BT-SD-379562-GO-RFQ / Pro Component 2: Enhancing Fa Request for Quota Single Stage - One E curement of mulching plastic TF / B6044 Post Open - National 3,000.00 0.00 Completed 2024-01-05 2024-02-07 2023-11-23 2024-03-23 2024-01-23 rmer Productivity tions nvelope sheets (2.3.4) BT-SD-379563-GO-DIR / Proc Component 2: Enhancing Fa urement of Nutrient Dense p TF / B6044 Post Direct Selection Direct - National 2,200.00 0.00 Completed 2023-12-31 2023-09-15 2024-01-05 2023-09-18 2024-01-30 2023-09-21 2024-03-15 rmer Productivity otato seed (Yusimaap) (2.3.2 ) BT-SD-379564-GO-DIR / Proc urement of hybrid vegetable Component 2: Enhancing Fa TF / B6044 Post Direct Selection Direct - National 13,400.00 0.00 Completed 2023-12-31 2023-09-07 2024-01-05 2023-09-08 2024-01-30 2024-03-15 seeds (2.3.1) and improved p rmer Productivity addy seed (white) (2.3.3) BT-SD-435736-GO-DIR / Proc urement of Electric fencing Component 2: Enhancing Fa Pending Impl TF / B6044 Post Direct Selection Direct - National 18,000.00 0.00 2024-07-31 2024-08-05 2024-09-09 2024-11-08 materials (GI Wire, HDPE Pip rmer Productivity ementation e, Plastic poles, Energizer, To ols) (2.3.2) BT-SD-435741-GO-RFQ / Pro Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl curement of office equipmen TF / B6044 Post Open - National 7,500.00 0.00 2024-08-05 2024-09-30 2024-11-29 ement tions nvelope ementation t & safety gears (4.2) BT-SD-435727-GO-DIR / Proc urement of SMART irrigation Component 2: Enhancing Fa Pending Impl controller set & Accessories TF / B6044 Post Direct Selection Direct - National 36,000.00 0.00 2024-07-31 2024-08-05 2024-09-09 2024-11-08 rmer Productivity ementation materials to be installed in th e existing poly house (2.1.1) BT-SD-435732-GO-DIR / Proc Component 2: Enhancing Fa Pending Impl urement of women- friendly l TF / B6044 Post Direct Selection Direct - National 72,000.00 0.00 2024-07-31 2024-08-05 2024-09-09 2024-12-08 rmer Productivity ementation abor-saving machinery (mini- tillers) (2.3.1) NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3