PROCUREMENT PLAN (Textual Part)
Project information: Sindh Flood Emergency Rehabilitation Project
(P179981)
Project Implementation agency(ies): (i) Sindh Planning & Development
Department (ii) Sindh Irrigation Department

Date of the Procurement Plan: December 2022
Period covered by this Procurement Plan: June 30 2024


Preamble

In accordance with paragraph 5.9 of the “World Bank Procurement Regulations
for IPF Borrowers” November 2020 (“Procurement Regulations”) the Bank’s
Systematic Tracking and Exchanges in Procurement (STEP) system will be
used to prepare, clear and update Procurement Plans and conduct all
procurement transactions for the Project.

This textual part along with the Procurement Plan tables in STEP constitute the
Procurement Plan for the Project. The following conditions apply to all
procurement activities in the Procurement Plan. The other elements of the
Procurement Plan as required under paragraph 4.4 of the Procurement
Regulations are set forth in STEP.

The Bank’s Standard Procurement Documents: shall be used for all
contracts subject to international competitive procurement and those
contracts as specified in the Procurement Plan tables in STEP.

National Procurement Arrangements: In accordance with paragraph 5.3
of the Procurement Regulations, when approaching the national market (as
specified in the Procurement Plan tables in STEP), the country’s own
procurement procedures may be used.
When the Borrower uses its own national open competitive procurement
arrangements as set forth in public procurement rules such arrangements
shall be subject to paragraph 5.4 of the Procurement Regulations and the
following conditions:
    1) The eligibility of bidders shall be as defined under Section III of the
       Procurement Regulations. Accordingly, no bidder or potential bidder
       shall be declared ineligible for contracts financed by the Bank for
       reasons other than those provided in Section III of the Procurement
       Regulations.
    2) For national open competitive procurement, only the model
       procurement documents acceptable to the World Bank, shall be used.
    3) The request for bids/request for proposals document shall require
       that Bidders/Proposers submitting Bids/Proposals present a signed
       acceptance (in the form attached) at the time of bidding, to be
       incorporated in any resulting contracts, confirming application of, and
       compliance with, the Bank’s Anti-Corruption Guidelines, including
       without limitation the Bank’s right to sanction and the Bank’s
       inspection and audit rights.
    4) Procurement Documents include provisions, as agreed with the Bank,
       intended to adequately mitigate against environmental, social
       (including sexual exploitation and abuse and gender-based violence),
       health and safety (“ESHS”) risks and impacts
    5) Access to procurement opportunities shall not be restricted to firms
       that have pre-registered and/or paid a registration fee.
    6) No preference of any kind shall be given to national bidders in the
       bidding process.
    7) Procurement methods that use two-envelope process and rated
       criteria shall be subject to Bank’s prior concurrence

    When other national procurement arrangements (other than national
    open competitive procurement) are applied by the Borrower, such
    arrangements shall be subject to paragraph 5.5 of the Procurement
    Regulations.

Leased Assets as specified under paragraph 5.10 of the Procurement
Regulations: Leasing may be used for those contracts identified in the
Procurement Plan
Procurement of Second Hand Goods as specified under paragraph 5.11 of
the Procurement Regulations – is not allowed
  Letter of Acceptance of the World Bank’s
  Anticorruption Guidelines and Sanctions
                Framework1


                                                 Date:



                                                Invitation of Bids/Proposals
                                          No.__________

To: ___________________________________________________________________________


We, along with our sub-contractors, sub-consultants, service providers, suppliers,
agents (whether declared or not) consultants and personnel, acknowledge and agree
to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt,
fraudulent, collusive, coercive, and obstructive practices), as set out and defined in
the World Bank’s Anti-Corruption Guidelines2 in connection with the procurement and
execution of the contract (in case of award), including any amendments thereto.


We declare and warrant that we, along our sub-contractors, sub-consultants, service
providers, suppliers, agents (whether declared or not), consultants and personnel,
are not subject to, and are not controlled by any entity or individual that is subject to,
a temporary suspension, early temporary suspension, or debarment imposed by a
member of the World Bank Group, including, inter alia, a cross-debarment imposed
by the World Bank Group as agreed with other international financial institutions
(including multilateral development banks), or through the application of a World
Bank Group finding of non-responsibility on the basis of Fraud and Corruption in
connection with World Bank Group corporate procurement. Further, we are not
ineligible under the laws or official regulations of [Insert name of Employer as per
bidding document] or pursuant to a decision of the United Nations Security Council.


We confirm our understanding of the consequences of not complying with the World
Bank’s Anti-Corruption Guidelines, which may include the following:
a. rejection of our Proposal/Bid for award of contract;

1[Drafting note: This document shall be signed by bidders/proposers/consultants and
submitted as part of their bids/proposals. In addition, this document shall be signed by the
winning bidder/consultant and incorporated as part of the contract.]
2Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by

International Bank for Reconstruction and Development Loans and the International
Development Agency Credits and Grants, dated October 15, 2006, and revised in January
2011 and July 2016, as they may be revised from time to time.
b. in the case of award, termination of the contract, without prejudice to any other
   remedy for breach of contract; and
c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance
   with its prevailing sanctions policies and procedures as set forth in the Bank’s
   Sanctions Framework. This may include a public declaration of ineligibility, either
   indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit
   from a Bank-financed contract, financially or in any other manner;3 (ii) to be a
   nominated4 sub-contractor, sub-consultant, consultant, manufacturer or supplier,
   or service provider of an otherwise eligible firm being awarded a Bank-financed
   contract; and (iii) to receive the proceeds of any loan made by the Bank or
   otherwise to participate further in the preparation or implementation of any Bank-
   financed project.

We understand that we may be declared ineligible as set out above upon:
a. completion of World Bank Group sanctions proceedings according to its prevailing
   sanctions procedures;
b. cross-debarment as agreed with other international financial institutions
   (including multilateral development banks);
c. the application of a World Bank Group finding of non-responsibility on the basis of
   Fraud and Corruption in connection with World Bank Group corporate
   procurement; or
d. temporary suspension or early temporary suspension in connection with an
   ongoing World Bank Group sanctions proceeding.

For avoidance of doubt, the foregoing effects of ineligibility do not extend to a
sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or
its ongoing sub-agreements under such contracts) that are not the subject of a
material modification, as determined by the Bank.


We shall permit, and shall cause our sub-contractors, sub-consultants, agents
(whether declared or not), personnel, consultants, service providers or suppliers, to
permit the Bank to inspect5 all accounts, records, and other documents relating to

3 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall
include, without limitation, (i) applying for pre-qualification or initial selection), expressing
interest in a consultancy, and bidding, either directly or as a nominated sub-contractor,
nominated consultant, nominated manufacturer or supplier, or nominated service provider, in
respect of such contract, and (ii) entering into an addendum or amendment introducing a
material modification to any existing contract.

4A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or
nominated service provider (different names are used depending on the bidding document)
is one which has been: (i) included by the bidder in its pre-qualification or initial selection
application or bid because it brings specific and critical experience and know-how that allow
the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by
the Borrower.

5Inspections  in this context are usually investigative (i.e., forensic) in nature: they involve fact-
finding activities undertaken by the Bank or persons appointed by the Bank to address specific
the procurement process and/or contract execution (in the case of award), and to
have them audited by auditors appointed by the Bank.


We agree to preserve all accounts, records, and other documents (whether in hard
copy or electronic format) related to the procurement and execution of the contract.


Name of the Bidder/Proposer/Consultant:



Name of the person duly authorized to sign the Bid/Proposal on behalf of the
Bidder/Proposer/ Consultant:


Title of the person signing the Letter:




matters related to investigations/audits, such as evaluating the veracity of an allegation of
possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes
but is not limited to accessing and examining a firm's or individual's financial records and
information, and making copies thereof as relevant; accessing and examining any other
documents, data, and information (whether in hard copy or electronic format) deemed
relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff
and other relevant individuals; performing physical inspections and site visits; and obtaining
third-party verification of information.
PROCUREMENT
                Pakistan : Sindh Flood Emergency Rehabilitation Project
PLAN
General Information
Country:           Pakistan                                                                                 2023-01-17
                                                       Bank’s Approval Date of the Original Procurement Plan:
                                                                                                            2024-07-10
                                                       Revised Plan Date(s): (comma delineated, leave blank if none)
Project ID:        P179981                             GPN Date:                                            2023-01-19
Project Name:      Sindh Flood Emergency Rehabilitation Project
Loan / Credit No:  IDA / 72500
                   Province of Sindh Irrigation Department
Executing Agency(ies):

WORKS
Activity Reference No. /                                                                                                                                                                           Estimated Actual Am                                                                                                                                                           Bid Evaluation Report
                                  Loan / Credit N                                                                      Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D                     Process St Draft Pre-qualification Prequalification Evalu   Draft Bidding Docum Specific Procurement            Bidding Documents a Proposal Submission /                                                          Contract Complet
       Description                                         Component                  Review Type       Method                                                                                     Amount (U ount (US$                                                                                                                                                           and Recommendation               Signed Contract
                                         o.                                                                                   h             cess           (Y/N)             isk     ocument Type                         atus         Documents               ation Report         ent / Justification Notice / Invitation                  s Issued        Opening / Minutes                                                                   ion
                                                                                                                                                                                                       S$)       )                                                                                                                                                                     for Award
                                                                                                                                                                                                                                   Planned     Actual      Planned      Actual     Planned       Actual      Planned       Actual       Planned     Actual  Planned     Actual    Planned     Actual            Planned       Actual      Planned

 PK-POSID-336211-CW-RFB /
Rehabilitation/ Construction                                                                                                               Single Stage - One E                       Other (with field f                                                                                                                                                                                                                                 2024-03-1
                               IDA / 72500          Infrastructure Rehabilitation   Post            Request for Bids   Open - National                                                                    5,681,818.00   0.00     Signed                                           2023-01-13   2022-12-19   2023-01-13                                     2023-01-24   2023-02-14   2023-02-23   2023-03-17   2023-03-13   2023-04-15
of Additional Outfall Regulato                                                                                                             nvelope                                    or explanation)                                                                                                                                                                                                                                         1
r Along Ochitto Outfall Drain
and Leading Channel.

 PK-POSID-336212-CW-RFB /
                                                                                                                                           Single Stage - One E                       Other (with field f                         Pending Imp                                                                                                                                                                                             2024-03-1
Rehabilitation of Main East Br IDA / 72500          Infrastructure Rehabilitation   Post            Request for Bids   Open - National                                                                    1,006,738.00   0.00                                                      2023-01-13                2023-01-13                                     2023-01-24                2023-02-23                2023-03-13
                                                                                                                                           nvelope                                    or explanation)                             lementation                                                                                                                                                                                                 1
anch Nawabshah.


 PK-POSID-336213-CW-RFB /
                                                                                                                                           Single Stage - One E                       Other (with field f                                                                                                                                                                                                                                 2024-03-1
Rehabilitation of Shikarpur Br IDA / 72500          Infrastructure Rehabilitation   Post            Request for Bids   Open - National                                                                      258,748.00   0.00     Signed                                           2023-01-13   2022-12-19   2023-01-13                                     2023-01-24   2023-02-14   2023-02-23   2023-03-06   2023-03-13   2023-04-06
                                                                                                                                           nvelope                                    or explanation)                                                                                                                                                                                                                                         1
. Drain system.


 PK-POSID-336214-CW-RFB /
Rehabilitation of Pharho Esca
                                                                                                                                           Single Stage - One E                       Other (with field f                                                                                                                                                                                                                                 2024-03-1
pe from RD 0+000 to 30+00 IDA / 72500               Infrastructure Rehabilitation   Post            Request for Bids   Open - National                                                                      139,273.00   0.00     Signed                                           2023-01-13   2022-12-19   2023-01-13                                     2023-01-24   2023-02-14   2023-02-23   2023-03-29   2023-03-13   2023-06-07
                                                                                                                                           nvelope                                    or explanation)                                                                                                                                                                                                                                         1
0 Both Sides in KhairpurGam
bo Sub Division of Nasir Divis
ion.

 PK-POSID-336215-CW-RFB /
Raising and Rehabilitation (E
arthwork) along Oderolal Esc
                                                                                                                                           Single Stage - One E                       Other (with field f                                                                                                                                                                                                                                 2024-03-1
ape from RD 0+000 to 71+0         IDA / 72500       Infrastructure Rehabilitation   Post            Request for Bids   Open - National                                                                    2,250,000.00   0.00     Signed                                           2023-01-13   2022-12-19   2023-01-13                                     2023-01-24   2023-02-14   2023-02-23   2023-03-03   2023-03-13   2023-04-04
                                                                                                                                           nvelope                                    or explanation)                                                                                                                                                                                                                                         1
00 NIP Side i/c installation of
new gates to increase capaci
ty of water to enable escape
discharge in Indus River.

 PK-POSID-336216-CW-RFB /                                                                                                                  Single Stage - One E                       Other (with field f                                                                                                                                                                                                                                 2024-03-1
                              IDA / 72500           Infrastructure Rehabilitation   Post            Request for Bids   Open - National                                                                      652,658.00   0.00     Canceled                                         2023-01-13                2023-01-13                                     2023-01-24                2023-02-23                2023-03-13
Rehabilitation of Karampur Ri                                                                                                              nvelope                                    or explanation)                                                                                                                                                                                                                                         1
ng Bund.

 PK-POSID-336217-CW-RFB /                                                                                                                  Single Stage - One E                       Other (with field f                                                                                                                                                                                                                                 2024-03-1
                              IDA / 72500           Infrastructure Rehabilitation   Post            Request for Bids   Open - National                                                                    1,590,120.00   0.00     Signed                                           2023-01-13   2022-12-19   2023-01-13                                     2023-01-24   2023-02-14   2023-02-23   2023-03-03   2023-03-13   2023-04-14
Rehabilitation of Suprio Bund                                                                                                              nvelope                                    or explanation)                                                                                                                                                                                                                                         1
.

 PK-POSID-336218-CW-RFB /
Package No. 1 Lot No. 1 Floo
d Detention Dam Lat-01 (DD/
                                                                                                                                           Single Stage - One E                       Other (with field f                                                                                                                                                                                                                                 2024-03-1
W-L01 along LatNai).         IDA / 72500            Infrastructure Rehabilitation   Post            Request for Bids   Open - National                                                                    7,586,543.00   0.00     Signed                                           2023-01-13   2022-12-26   2023-01-13   2023-01-25                        2023-01-31   2023-01-31   2023-03-02   2023-02-20   2023-03-20   2023-03-29
                                                                                                                                           nvelope                                    or explanation)                                                                                                                                                                                                                                         8
               Lot No.2 Floo
d Detention Dam Lat-02 (DD/
W-L02 along LatNai).


 PK-POSID-336219-CW-RFB /
Package No. 2 Lot No. 1 Floo
d Detention Dam Lat-03 (DD/
                                                                                                                                           Single Stage - One E                       Other (with field f                                                                                                                                                                                                                                 2024-03-1
W-L03 along LatNai).         IDA / 72500            Infrastructure Rehabilitation   Post            Request for Bids   Open - National                                                                    7,919,065.00   0.00     Signed                                           2023-01-13   2022-12-26   2023-01-13   2023-01-25                        2023-01-31   2023-01-31   2023-03-02   2023-02-20   2023-03-20   2023-04-11
                                                                                                                                           nvelope                                    or explanation)                                                                                                                                                                                                                                         8
               Lot No. 2 Flo
od Detention Dam Lat-04 (D
D/W-L04 along LatNai).


 PK-POSID-336220-CW-RFB /
                                                                                                                                           Single Stage - One E                       Other (with field f                                                                                                                                                                                                                                 2024-03-1
Package No.3 Flood Detentio IDA / 72500             Infrastructure Rehabilitation   Post            Request for Bids   Open - National                                                                    4,597,684.00   0.00     Signed                                           2023-01-13   2022-12-26   2023-01-13   2023-01-25                        2023-01-31   2023-01-31   2023-03-02   2023-02-20   2023-03-20   2023-04-11
                                                                                                                                           nvelope                                    or explanation)                                                                                                                                                                                                                                         8
n Dam Mole-02 (DD/W-M2 al
ong Mole Nai).

 PK-POSID-336221-CW-RFB /
Package No. 4 Lot No. 1 Floo
d Detention Dam Mole-03 (D
                                                                                                                                           Single Stage - One E                       Other (with field f                                                                                                                                                                                                                                 2024-03-1
D/W-M3 along Mole Nai).       IDA / 72500           Infrastructure Rehabilitation   Post            Request for Bids   Open - National                                                                    7,993,696.00   0.00     Signed                                           2023-01-13   2022-12-26   2023-01-13   2023-01-25                        2023-01-31   2023-01-31   2023-03-02   2023-03-07   2023-03-20   2023-04-21
                                                                                                                                           nvelope                                    or explanation)                                                                                                                                                                                                                                         8
               Lot No. 2 Floo
d Detention Dam Mole-04 (D
D/W-M4 along Mole Nai).


 PK-POSID-336223-CW-RFB /
Package No. 5 Lot No. 1 Floo
d Detention Dam Mole-05 (D
                                                                                                                                           Single Stage - One E                       Other (with field f                                                                                                                                                                                                                                 2024-03-1
D/W-M5 along Mole Nai).      IDA / 72500            Infrastructure Rehabilitation   Post            Request for Bids   Open - National                                                                    8,779,468.00   0.00     Signed                                           2023-01-14   2022-12-26   2023-01-14   2023-01-25                        2023-01-31   2023-01-31   2023-03-02   2023-02-20   2023-03-20   2023-04-14
                                                                                                                                           nvelope                                    or explanation)                                                                                                                                                                                                                                         8
              Lot No. 2 Floo
d Detention Dam Mole-06 (D
D/W-M6 along Mole Nai).


 PK-POSID-336225-CW-RFB /
Package No. 6 Lot No.1 Floo
d Detention Dam Mole-07 (D
                                                                                                                                           Single Stage - One E                       Other (with field f                                                                                                                                                                                                                                 2024-03-1
D/W-M7 along Mole Nai).      IDA / 72500            Infrastructure Rehabilitation   Post            Request for Bids   Open - National                                                                    7,608,233.00   0.00     Signed                                           2023-01-14   2022-12-26   2023-01-14   2023-01-25                        2023-01-31   2023-01-31   2023-03-02   2023-03-07   2023-03-20   2023-04-25
                                                                                                                                           nvelope                                    or explanation)                                                                                                                                                                                                                                         8
               Lot No. 2 Flo
od Detention Dam Mole -08 (
DD/W-M8 along Mole Nai).


 PK-POSID-336067-CW-DIR /
                                                                                                                                                                                      Other (with field f                                                                                                                                                                                                                                 2023-04-2
Rehabilitation OF Manchar C IDA / 72500             Infrastructure Rehabilitation   Post            Direct Selection   Direct - National                                                                  4,251,592.00   0.00     Completed                                        2023-01-13   2022-10-21   2023-01-13   2022-10-24                                                                            2023-01-21   2022-11-17
                                                                                                                                                                                      or explanation)                                                                                                                                                                                                                                         1
ONTAINING BUND (RD 0+000
TO 27+000 ).

PK-POSID-336093-CW-DIR /
                                                                                                                                                                                      Other (with field f                                                                                                                                                                                                                                 2023-04-2
REHABILITATION OF DANISTA IDA / 72500               Infrastructure Rehabilitation   Post            Direct Selection   Direct - National                                                                  3,682,097.00   0.00     Completed                                        2023-01-13   2022-11-14   2023-01-13   2022-11-15                                                                            2023-01-21   2022-12-08
                                                                                                                                                                                      or explanation)                                                                                                                                                                                                                                         1
R CANAL (RD 0+000 TO 27+
440).

 PK-POSID-336083-CW-DIR /
                                                                                                                                                                                      Other (with field f                                                                                                                                                                                                                                 2023-04-2
REHABILITATION OF DHORO           IDA / 72500       Infrastructure Rehabilitation   Post            Direct Selection   Direct - National                                                                  2,427,760.00   0.00     Signed                                           2023-01-13   2022-10-21   2023-01-13   2022-10-24                                                                            2023-01-21   2022-11-17
                                                                                                                                                                                      or explanation)                                                                                                                                                                                                                                         1
PURAN RD 176+400 to 210+
000.

PK-POSID-336069-CW-DIR /
REHABILITATION OF MANCHA                                                                                                                                                              Other (with field f                                                                                                                                                                                                                                 2023-04-2
                         IDA / 72500                Infrastructure Rehabilitation   Post            Direct Selection   Direct - National                                                                  4,483,243.00   0.00     Completed                                        2023-01-13   2022-10-21   2023-01-13   2022-10-24                                                                            2023-01-21   2022-11-17
R CONTAINING BUND (RD 54                                                                                                                                                              or explanation)                                                                                                                                                                                                                                         1
+000 TO 77+000 ).




                                                                                                                                                                                                                         Page 1
PK-POSID-336074-CW-DIR /
                                                                                                                           Other (with field f                                                                                                                     2023-04-2
Rehabilitation of FP Bund (RD IDA / 72500    Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       4,543,288.00   0.00     Signed        2023-01-13   2022-10-28   2023-01-13   2022-10-31   2023-01-21   2022-12-01
                                                                                                                           or explanation)                                                                                                                             1
380+000 to RD 445+000).


PK-POSID-336077-CW-DIR /
Rehabilitation of FP Bund (RD                                                                                              Other (with field f                                                                                                                     2023-04-2
                              IDA / 72500    Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       4,748,317.00   0.00     Completed     2023-01-13   2022-10-28   2023-01-13   2022-10-31   2023-01-21   2022-12-01
490+000 to RD 502+000 & R                                                                                                  or explanation)                                                                                                                             1
D 263+000 to RD 220+000).


PK-POSID-336079-CW-DIR /
                                                                                                                           Other (with field f                                                                                                                     2023-04-2
Rehabilitation of FP Bund (RD IDA / 72500    Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       4,492,892.00   0.00     Signed        2023-01-13   2022-10-28   2023-01-13   2022-10-31   2023-01-21   2022-12-01
                                                                                                                           or explanation)                                                                                                                             1
220+000 to RD 169+000).


 PK-POSID-336085-CW-DIR /
REHABILITATION OF DHORO                                                                                                    Other (with field f                                                                                                                     2023-04-2
                               IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       4,318,122.00   0.00     Signed        2023-01-13   2022-10-21   2023-01-13   2022-10-24   2023-01-21   2022-11-17
PURAN RD 210+000 TO 222                                                                                                    or explanation)                                                                                                                             1
+130 AND MAIN DRAIN RD 2
12+300 TO 217+600.

PK-POSID-336075-CW-DIR /
                                                                                                                           Other (with field f                                                                                                                     2023-04-2
Rehabilitation of FP Bund (RD IDA / 72500    Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       4,604,680.00   0.00     Signed        2023-01-13   2022-10-21   2023-01-13   2022-10-24   2023-01-21   2022-11-17
                                                                                                                           or explanation)                                                                                                                             1
445+000 to RD 490+000).


 PK-POSID-335890-CW-DIR /
                                                                                                                           Other (with field f                                                                                                                     2023-02-1
Plugging and Strengthening     IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                         635,481.00   0.00     Completed     2023-01-12   2022-09-26   2023-01-12   2022-09-28   2023-01-20   2022-10-22
                                                                                                                           or explanation)                                                                                                                             9
of Breach along Saifullah Ma
gsi Branch.

 PK-POSID-335912-CW-DIR /
                                                                                                                           Other (with field f                                                                                                                     2023-02-1
Plugging, Strengthening Rest IDA / 72500     Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                         930,558.00   0.00     Completed     2023-01-12   2022-10-05   2023-01-12   2022-10-07   2023-01-20   2022-10-27
                                                                                                                           or explanation)                                                                                                                             9
oration and Rehabilitation of
Dhamrah Wah.

 PK-POSID-335914-CW-DIR /
Replacement / Supply and In
stallation of Motor Pump (10                                                                                               Other (with field f                                                                                                                     2023-04-2
                               IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       1,074,545.00   0.00     Completed     2023-01-12   2022-10-05   2023-01-12   2022-10-07   2023-01-20   2022-10-27
0 H.P) Including All Accessori                                                                                             or explanation)                                                                                                                             0
es Along Ghaar, Shahmeer,
Mehar, Mashori, K.N.Shah, Mi
ro Khan and Agani Pumping
Stations.
 PK-POSID-335916-CW-DIR /
Plugging and Strengthening                                                                                                 Other (with field f                                                                                                                     2023-02-1
                               IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                         977,477.00   0.00     Completed     2023-01-12   2022-10-14   2023-01-12   2022-10-17   2023-01-20   2022-11-04
of Breach along Main Nara V                                                                                                or explanation)                                                                                                                             9
alley (MNV) Drain at RD 280.


 PK-POSID-335928-CW-DIR /
                                                                                                                           Other (with field f                         Under Imple                                                                                 2023-02-1
Closing of cuts alog Rohri Mai IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                         469,559.00   0.00                   2023-01-12   2022-10-14   2023-01-12   2022-10-17   2023-01-20
                                                                                                                           or explanation)                             mentation                                                                                       9
n Canal, Moro Division.


 PK-POSID-335933-CW-DIR /
Plugging And Strengthening                                                                                                 Other (with field f                                                                                                                     2023-02-1
                               IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       1,022,523.00   0.00     Completed     2023-01-12   2022-10-28   2023-01-12   2022-10-31   2023-01-20   2022-11-28
Of Relief Cut Along Johi Branc                                                                                             or explanation)                                                                                                                             9
h Along Rd 80 To Rd 86 And
Rd 95 To Rd 98.

 PK-POSID-335862-CW-DIR /
                                                                                                                           Other (with field f                                                                                                                     2023-02-1
Plugging and Strengthening   IDA / 72500     Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                         226,695.00   0.00     Signed        2023-01-12   2022-09-26   2023-01-12   2022-09-28   2023-01-20   2022-10-22
                                                                                                                           or explanation)                                                                                                                             9
of Breach along FP Bund alon
g 169+000.

 PK-POSID-335917-CW-DIR /
Plugging and Strengthening                                                                                                 Other (with field f                                                                                                                     2023-02-1
                               IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                         309,602.00   0.00     Completed     2023-01-12   2022-10-14   2023-01-12   2022-10-17   2023-01-20   2022-11-04
of Breach along Main Nara V                                                                                                or explanation)                                                                                                                             9
alley (MNV) Drain at RD 330.


 PK-POSID-335893-CW-DIR /
Plugging and Strengthening                                                                                                 Other (with field f                                                                                                                     2023-02-1
                             IDA / 72500     Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                         407,933.00   0.00     Completed     2023-01-12   2022-10-05   2023-01-12   2022-10-07   2023-01-20   2022-10-27
of Breaches / Cuts Along Gha                                                                                               or explanation)                                                                                                                             9
r Main Drain & Leading Chan
nel.

 PK-POSID-335905-CW-DIR /
                                                                                                                           Other (with field f                                                                                                                     2023-02-1
Plugging and Strengthening    IDA / 72500    Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                         782,058.00   0.00     Completed     2023-01-12   2022-10-05   2023-01-12   2022-10-07   2023-01-20   2022-10-27
                                                                                                                           or explanation)                                                                                                                             9
of Breaches / Cuts Along Miro
 Khan Main Drain.

 PK-POSID-335919-CW-DIR /
Plugging, Strengthening and                                                                                                Other (with field f                                                                                                                     2023-02-1
                              IDA / 72500    Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                         346,364.00   0.00     Completed     2023-01-12   2022-10-14   2023-01-12   2022-10-17   2023-01-20   2022-11-04
Stone Pitching of Breach alon                                                                                              or explanation)                                                                                                                             9
g Superio Bund RD 12.


 PK-POSID-335920-CW-DIR /
Plugging, Strengthening and                                                                                                Other (with field f                                                                                                                     2023-02-1
                              IDA / 72500    Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                         249,294.00   0.00     Completed     2023-01-12   2022-10-14   2023-01-12   2022-10-17   2023-01-20   2022-11-04
Stone Pitching of Breach alon                                                                                              or explanation)                                                                                                                             9
g Superio Bund RD 28.


PK-POSID-336089-CW-DIR /
REMODELING AND REHABILIT                                                                                                   Other (with field f                                                                                                                     2023-04-2
                         IDA / 72500         Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       6,486,130.00   0.00     Signed        2023-01-13   2022-10-28   2023-01-13   2022-10-31   2023-01-21   2022-11-28
ATION OF ARAL HEAD REGUL                                                                                                   or explanation)                                                                                                                             1
ATOR (MC RD 0+000).


 PK-POSID-336087-CW-DIR /
REHABILITATION OF OUTFALL                                                                                                  Other (with field f                                                                                                                     2023-04-2
                          IDA / 72500        Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       2,482,485.00   0.00     Signed        2023-01-13   2022-10-21   2023-01-13   2022-10-24   2023-01-21   2022-11-17
STRUCTURE AT RD 210+000                                                                                                    or explanation)                                                                                                                             1
OF DHORO PURAN.


PK-POSID-336070-CW-DIR /
REHABILITATION OF MANCHA                                                                                                   Other (with field f                                                                                                                     2023-04-2
                         IDA / 72500         Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       4,542,517.00   0.00     Completed     2023-01-13   2022-10-21   2023-01-13   2022-10-24   2023-01-21   2022-11-17
R CONTAINING BUND (RD 77                                                                                                   or explanation)                                                                                                                             1
+000 TO 100+000).


PK-POSID-336071-CW-DIR /
                                                                                                                           Other (with field f                                                                                                                     2023-04-2
Rehabilitation of FP Bund (RD IDA / 72500    Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       4,475,187.00   0.00     Completed     2023-01-13   2022-10-21   2023-01-13   2022-10-24   2023-01-21   2022-11-17
                                                                                                                           or explanation)                                                                                                                             1
160+000 to RD 210+000).


 PK-POSID-335923-CW-DIR /
Plugging, Strengthening and                                                                                                Other (with field f                                                                                                                     2023-02-1
                              IDA / 72500    Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                          60,393.00   0.00     Completed     2023-01-12   2022-10-14   2023-01-12   2022-10-17   2023-01-20   2022-11-04
Stone Pitching of Breach alon                                                                                              or explanation)                                                                                                                             9
g Superio Bund RD 42.


PK-POSID-336091-CW-DIR /
                                                                                                                           Other (with field f                                                                                                                     2023-04-2
REHABILITATION OF LEFT AR      IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       3,156,718.00   0.00     Signed        2023-01-13   2022-10-28   2023-01-13   2022-10-31   2023-01-21   2022-12-01
                                                                                                                           or explanation)                                                                                                                             1
AL BUND RD 0+000 TO RD 1
9+000.

 PK-POSID-335931-CW-DIR /
                                                                                                                           Other (with field f                                                                                                                     2023-02-1
Repair of Rain Damages of S    IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       1,397,355.00   0.00     Signed        2023-01-12   2022-10-14   2023-01-12   2022-10-17   2023-01-20   2022-11-04
                                                                                                                           or explanation)                                                                                                                             9
mall Dams Under Small Dam
s Organization.




                                                                                                                                                              Page 2
 PK-POSID-335855-CW-DIR /
Plugging, Strengthening & St                                                                                                 Other (with field f                                                                                                                   2023-02-1
                                 IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                         219,056.00   0.00     Signed      2023-01-12   2022-09-26   2023-01-12   2022-09-28   2023-01-20   2022-10-22
one Pitching of Relief Cut Lar                                                                                               or explanation)                                                                                                                           9
kana Sehwan Bund along Mil
e 95/6.

 PK-POSID-336080-CW-DIR /
                                                                                                                             Other (with field f                                                                                                                   2023-04-2
REHABILITATION OF DHORO          IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       3,250,317.00   0.00     Signed      2023-01-13   2022-10-21   2023-01-13   2022-10-24   2023-01-21   2022-11-17
                                                                                                                             or explanation)                                                                                                                           1
PURAN RD 110+000 TO 143
+330.

 PK-POSID-335851-CW-DIR /
Plugging and Strengthening                                                                                                   Other (with field f                                                                                                                   2023-02-1
                                 IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       1,249,943.00   0.00     Completed   2023-01-12   2022-09-26   2023-01-12   2022-09-28   2023-01-20   2022-10-22
of Relief Cut along Manchar                                                                                                  or explanation)                                                                                                                           9
Containing Bund at RD 52+0
00.

 PK-POSID-335854-CW-DIR /
Plugging and Strengthening                                                                                                   Other (with field f                                                                                                                   2023-02-1
                            IDA / 72500        Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       1,133,842.00   0.00     Completed   2023-01-12   2022-09-26   2023-01-12   2022-09-28   2023-01-20   2022-10-22
of Breach along Main Nara V                                                                                                  or explanation)                                                                                                                           9
aley (MNV) Drain at RD 8+06
8.

 PK-POSID-335887-CW-DIR /
                                                                                                                             Other (with field f                                                                                                                   2023-02-1
Plugging and Strengthening   IDA / 72500       Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                         180,708.00   0.00     Completed   2023-01-12   2022-09-26   2023-01-12   2022-09-28   2023-01-20   2022-10-22
                                                                                                                             or explanation)                                                                                                                           9
of Breach along FP Bund alon
g RD 476+000.

 PK-POSID-336081-CW-DIR /
                                                                                                                             Other (with field f                                                                                                                   2023-04-2
REHABILITATION OF DHORO          IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       3,491,000.00   0.00     Signed      2023-01-13   2022-10-21   2023-01-13   2022-10-24   2023-01-21   2022-11-17
                                                                                                                             or explanation)                                                                                                                           1
PURAN RD 143+330 TO 176
+400.

 PK-POSID-335925-CW-DIR /
Plugging, Strengthening and                                                                                                  Other (with field f                                                                                                                   2023-02-1
                              IDA / 72500      Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                         189,836.00   0.00     Completed   2023-01-12   2022-10-14   2023-01-12   2022-10-17   2023-01-20   2022-11-04
Stone Pitching of Breach alon                                                                                                or explanation)                                                                                                                           9
g Superio Bund RD 52.


 PK-POSID-335929-CW-DIR /
                                                                                                                             Other (with field f                                                                                                                   2023-02-1
Repair of Rain Damages Sma IDA / 72500         Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       1,912,465.00   0.00     Completed   2023-01-12   2022-10-14   2023-01-12   2022-10-17   2023-01-20   2022-11-04
                                                                                                                             or explanation)                                                                                                                           9
ll Dams Under Sindh Resilien
ce Project (SRP).

 PK-POSID-335898-CW-DIR /
Plugging and Strengthening                                                                                                   Other (with field f                                                                                                                   2023-02-1
                                 IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                         493,189.00   0.00     Completed   2023-01-12   2022-10-05   2023-01-12   2022-10-07   2023-01-20   2022-10-27
of Breaches Along K.N Shah                                                                                                   or explanation)                                                                                                                           9
Main Drain & Leading Chann
el.

 PK-POSID-335927-CW-DIR /
Plugging, Strengthening and                                                                                                  Other (with field f                                                                                                                   2023-02-1
                              IDA / 72500      Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                          44,676.00   0.00     Completed   2023-01-12   2022-10-14   2023-01-12   2022-10-17   2023-01-20   2022-11-04
Stone Pitching of Breach alon                                                                                                or explanation)                                                                                                                           9
g Superio Bund RD 82.


 PK-POSID-335858-CW-DIR /
Plugging, Strengthening & St                                                                                                 Other (with field f                                                                                                                   2023-02-1
                                 IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                         906,846.00   0.00     Completed   2023-01-12   2022-10-05   2023-01-12   2022-10-07   2023-01-20   2022-10-22
one Pitching of Relief Cut Lar                                                                                               or explanation)                                                                                                                           9
kana Sehwan Bund along Mil
e 97/2.

 PK-POSID-335873-CW-DIR /
                                                                                                                             Other (with field f                                                                                                                   2023-02-1
Plugging and Strengthening   IDA / 72500       Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       1,452,498.00   0.00     Completed   2023-01-12   2022-09-26   2023-01-12   2022-09-28   2023-01-20   2022-10-22
                                                                                                                             or explanation)                                                                                                                           9
of Breach along FP Bund alon
g RD 340+000.

 PK-POSID-335915-CW-DIR /
Plugging and Strengthening                                                                                                   Other (with field f                                                                                                                   2023-02-1
                                 IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                         802,253.00   0.00     Completed   2023-01-12   2022-10-14   2023-01-12   2022-10-17   2023-01-20   2022-11-04
of Breach along Main Nara V                                                                                                  or explanation)                                                                                                                           9
alley (MNV) Drain at RD 210.


 PK-POSID-335821-CW-DIR /
Plugging and Strengthening                                                                                                   Other (with field f                                                                                                                   2023-02-1
                                 IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       1,135,696.00   0.00     Completed   2023-01-12   2022-09-26   2023-01-12   2022-09-28   2023-01-20   2022-10-22
of Relief Cut along Manchar                                                                                                  or explanation)                                                                                                                           9
Containing Bund at RD 14+0
00.

 PK-POSID-335903-CW-DIR /
Plugging and Strengthening                                                                                                   Other (with field f                                                                                                                   2023-02-1
                                 IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                         385,539.00   0.00     Completed   2023-01-12   2022-10-05   2023-01-12   2022-10-07   2023-01-20   2022-10-27
of Breaches / Cuts Along Sha                                                                                                 or explanation)                                                                                                                           9
hdad Kot Branch Drain.


PK-POSID-336068-CW-DIR /
REHABILITATION OF MANCHA                                                                                                     Other (with field f                                                                                                                   2023-04-2
                         IDA / 72500           Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       4,538,878.00   0.00     Signed      2023-01-13   2022-10-21   2023-01-13   2022-10-24   2023-01-21   2022-11-17
R CONTAINING BUND (RD 27                                                                                                     or explanation)                                                                                                                           1
+000 TO 54+000 ).


PK-POSID-336072-CW-DIR /
                                                                                                                             Other (with field f                                                                                                                   2023-04-2
Rehabilitation of FP Bund (RD IDA / 72500      Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       4,524,135.00   0.00     Signed      2023-01-13   2022-10-28   2023-01-13   2022-10-31   2023-01-21   2022-12-01
                                                                                                                             or explanation)                                                                                                                           1
325+000 to RD 380+000).


PK-POSID-336094-CW-DIR /
                                                                                                                             Other (with field f                                                                                                                   2023-04-2
REHABILITATION OF DANISTA IDA / 72500          Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       3,633,010.00   0.00     Completed   2023-01-13   2022-11-14   2023-01-13   2022-11-15   2023-01-21   2022-12-08
                                                                                                                             or explanation)                                                                                                                           1
R CANAL (RD 27+440 TO 56
+434).

 PK-POSID-335860-CW-DIR /
Plugging, Strengthening & St                                                                                                 Other (with field f                                                                                                                   2023-02-1
                                 IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       2,231,284.00   0.00     Completed   2023-01-12   2022-09-26   2023-01-12   2022-09-28   2023-01-20   2022-10-22
one Pitching of Relief Cut Lar                                                                                               or explanation)                                                                                                                           9
kana Sehwan Bund along Mil
e 99/3.

 PK-POSID-335909-CW-DIR /
                                                                                                                             Other (with field f                                                                                                                   2023-02-1
Plugging and Strengthening       IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       2,075,286.00   0.00     Signed      2023-01-12   2022-10-05   2023-01-12   2022-10-07   2023-01-20   2022-10-27
                                                                                                                             or explanation)                                                                                                                           9
of Breach Along F.P Bund Rd
432.

 PK-POSID-335932-CW-DIR /
Repair of Gaj Diversion Bund
                                                                                                                             Other (with field f                                                                                                                   2023-02-1
ledge and stone apron from    IDA / 72500      Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       1,342,347.00   0.00     Signed      2023-01-12   2022-10-14   2023-01-12   2022-10-17   2023-01-20   2022-11-04
                                                                                                                             or explanation)                                                                                                                           9
RD 3-11, Repair of Gaj Divers
ion Bund stone apron from R
D 15-32.5.

 PK-POSID-335867-CW-DIR /
                                                                                                                             Other (with field f                                                                                                                   2023-02-1
Plugging and Strengthening   IDA / 72500       Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                         552,124.00   0.00     Completed   2023-01-12   2022-09-26   2023-01-12   2022-09-28   2023-01-20   2022-10-22
                                                                                                                             or explanation)                                                                                                                           9
of Breach along FP Bund alon
g RD 215+000.

 PK-POSID-335853-CW-DIR /
Plugging and Strengthening                                                                                                   Other (with field f                                                                                                                   2023-02-1
                            IDA / 72500        Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       1,361,326.00   0.00     Completed   2023-01-12   2022-09-26   2023-01-12   2022-09-28   2023-01-20   2022-10-22
of Breach along Main Nara V                                                                                                  or explanation)                                                                                                                           9
aley (MNV) Drain at RD 2+31
8.

 PK-POSID-335908-CW-DIR /
                                                                                                                             Other (with field f                                                                                                                   2023-02-1
Plugging and Strengthening       IDA / 72500   Infrastructure Rehabilitation   Post   Direct Selection   Direct - National                       1,747,581.00   0.00     Completed   2023-01-12   2022-10-05   2023-01-12   2022-10-07   2023-01-20   2022-10-27
                                                                                                                             or explanation)                                                                                                                           9
of Breaches Along Indus Link
Drain.




                                                                                                                                                                Page 3
PK-POSID-336092-CW-DIR /
REMODELING AND REHABILIT                                                                                                                              Other (with field f                                                                                                                                               2023-04-2
                         IDA / 72500           Infrastructure Rehabilitation   Post    Direct Selection   Direct - National                                               3,469,384.00   0.00     Signed        2023-01-13   2022-11-14   2023-01-13   2022-11-15                             2023-01-21   2022-12-08
ATION OF ARAL WAH (RD 1+                                                                                                                              or explanation)                                                                                                                                                       1
250 TO RD 0+000 & RD 0+0
00 TO 14+000).

 PK-POSID-336095-CW-DIR /
Remodeling and Rehabilitatio
                                                                                                                                                      Other (with field f                                                                                                                                               2023-04-2
n of Danister Tail Regulator a IDA / 72500     Infrastructure Rehabilitation   Post    Direct Selection   Direct - National                                               2,745,403.00   0.00     Signed        2023-01-13   2022-11-14   2023-01-13   2022-11-15                             2023-01-21   2022-12-08
                                                                                                                                                      or explanation)                                                                                                                                                       1
nd Regulator for 10 Phats (Mi
nors) Danister Canal (Civil W
orks).

 PK-POSID-343948-CW-DIR /
                                                                                                                                                      Other (with field f                                                                                                                                               2023-05-2
Rehabilitation Of Old Water  IDA / 72500       Infrastructure Rehabilitation   Post    Direct Selection   Direct - National                                                 173,193.00   0.00     Signed        2023-02-20   2022-12-07   2023-02-20   2022-12-09                             2023-02-28   2023-01-12
                                                                                                                                                      or explanation)                                                                                                                                                       9
Way In Desert Area Of Khairp
ur.
                                                                                                                                                      Request for Quota
 PK-POSID-341482-CW-RFQ /
                                                                                       Request for Quota                       Single Stage - One E   tions - Small Work                                                                                                                                                2023-12-1
Rehabilitation of Talpur Wad IDA / 72500       Infrastructure Rehabilitation   Post                      Limited                                                            530,161.00   0.00     Signed                                  2023-02-24   2023-02-27                             2023-03-17   2023-04-07
                                                                                       tions                                   nvelope                s (Emergency) SP                                                                                                                                                      2
a Pumping Station And Water
                                                                                                                                                      D -Competitive
Carrier Drain.

 PK-POSID-341480-CW-RFQ /                                                                                                                             Request for Quota
Rehabilitation of Syphon at A                                                          Request for Quota                       Single Stage - One E   tions - Small Work                                                                                                                                                2023-12-1
                              IDA / 72500      Infrastructure Rehabilitation   Post                      Limited                                                            294,021.00   0.00     Terminated                              2023-02-24   2023-02-27                             2023-03-17   2023-04-07
li Bahar Branch And Rehabilit                                                          tions                                   nvelope                s (Emergency) SP                                                                                                                                                      2
ation of Syphon at Kubri Mino                                                                                                                         D -Competitive
r.
                                                                                                                                                      Request for Quota
 PK-POSID-341483-CW-RFQ /
                                                                                       Request for Quota                       Single Stage - One E   tions - Small Work                                                                                                                                                2023-12-1
Rehabilitation of G & F Pumpi IDA / 72500      Infrastructure Rehabilitation   Post                      Limited                                                            752,713.00   0.00     Signed                                  2023-02-24   2023-02-27                             2023-03-17   2023-04-07
                                                                                       tions                                   nvelope                s (Emergency) SP                                                                                                                                                      2
ng Station.
                                                                                                                                                      D -Competitive
                                                                                                                                                      Request for Quota
 PK-POSID-341485-CW-RFQ /
                                                                                       Request for Quota                       Single Stage - One E   tions - Small Work                                                                                                                                                2023-12-1
Rehabilitation of Karampur Ri IDA / 72500      Infrastructure Rehabilitation   Post                      Limited                                                            527,885.00   0.00     Signed                                  2023-02-24   2023-02-27                             2023-03-17   2023-04-14
                                                                                       tions                                   nvelope                s (Emergency) SP                                                                                                                                                      2
ng Bund.
                                                                                                                                                      D -Competitive

PK-POSID-335901-CW-DIR /                                                                                                                              Other (with field f                                                                                                                                               2023-02-1
                                 IDA / 72500   Infrastructure Rehabilitation   Post    Direct Selection   Direct - National                                                 337,811.00   0.00     Signed        2023-01-12   2022-10-05   2023-01-12   2022-10-07                             2023-01-20   2022-10-27
Rehabilitation Of Mehar Main                                                                                                                          or explanation)                                                                                                                                                       9
Drain.

PK-POSID-348241-CW-DIR /
Rehabilitation of F.P Bund (R                                                                                                                         Other (with field f                                                                                                                                               2023-12-1
                              IDA / 72500      Infrastructure Rehabilitation   Post    Direct Selection   Direct - National                                               4,507,304.00   0.00     Completed     2023-03-09   2022-12-07   2023-03-09   2022-12-09                             2023-03-17   2023-01-12
D 0+000 to RD 20+000 & RD                                                                                                                             or explanation)                                                                                                                                                       2
75+000 to RD 160+000).


PK-POSID-348243-CW-DIR /
                                                                                                                                                      Other (with field f                                                                                                                                               2023-12-1
Rehabilitation of F.P Bund (R    IDA / 72500   Infrastructure Rehabilitation   Post    Direct Selection   Direct - National                                               4,533,536.00   0.00     Completed     2023-03-09   2022-12-07   2023-03-09   2022-12-09                             2023-03-17   2023-01-12
                                                                                                                                                      or explanation)                                                                                                                                                       2
D 210+000 to RD 265+000).


PK-POSID-348244-CW-DIR /
                                                                                                                                                      Other (with field f                                                                                                                                               2023-12-1
Rehabilitation of F.P Bund (R    IDA / 72500   Infrastructure Rehabilitation   Post    Direct Selection   Direct - National                                               4,506,334.00   0.00     Signed        2023-03-09   2022-12-07   2023-03-09   2022-12-09                             2023-03-17   2023-01-12
                                                                                                                                                      or explanation)                                                                                                                                                       2
D 265+000 to RD 325+000).


 PK-POSID-348246-CW-DIR /
Rehabilitation of Gates in Ara                                                                                                                        Other (with field f                                                                                                                                               2023-12-1
                               IDA / 72500     Infrastructure Rehabilitation   Post    Direct Selection   Direct - National                                               3,361,791.00   0.00     Signed        2023-03-09   2022-12-07   2023-03-09   2022-12-09                             2023-03-17   2023-01-11
l Head Regulator, Dainster Ta                                                                                                                         or explanation)                                                                                                                                                       2
il Regulator and 10 Phats (Mi
nors) Regulators.

 PK-POSID-348248-CW-DIR /
Rehabilitation of Retaining W                                                                                                                         Other (with field f                                                                                                                                               2023-12-1
                                 IDA / 72500   Infrastructure Rehabilitation   Post    Direct Selection   Direct - National                                               4,976,266.00   0.00     Completed     2023-03-09   2022-12-07   2023-03-09   2022-12-09                             2023-03-17   2023-01-12
all (3 RDs) along Danistar Ca                                                                                                                         or explanation)                                                                                                                                                       2
nal (Bubak/Miani Town).


 PK-POSID-348251-CW-DIR /
                                                                                                                                                      Other (with field f                                                                                                                                               2023-12-1
Rehabilitation of Irrigation W   IDA / 72500   Infrastructure Rehabilitation   Post    Direct Selection   Direct - National                                               3,348,712.00   0.00     Signed        2023-03-09   2022-12-07   2023-03-09   2022-12-09                             2023-03-17   2023-01-11
                                                                                                                                                      or explanation)                                                                                                                                                       2
orks on Johi Branch.


 PK-POSID-348254-CW-DIR /
Remodeling of Shaheed Bena                                                                                                                            Other (with field f                                                                                                                                               2023-12-1
                            IDA / 72500        Infrastructure Rehabilitation   Post    Direct Selection   Direct - National                                               5,891,955.00   0.00     Completed     2023-03-09   2022-12-07   2023-03-09   2022-12-09                             2023-03-17   2023-01-11
zirabad Stormwater Drain (R                                                                                                                           or explanation)                                                                                                                                                       2
D 0+000 to 16+556).


 PK-POSID-348257-CW-DIR /
Remodeling of Shaheed Bena                                                                                                                            Other (with field f                                                                                                                                               2023-12-1
                            IDA / 72500        Infrastructure Rehabilitation   Post    Direct Selection   Direct - National                                               5,558,022.00   0.00     Completed     2023-03-09   2022-12-07   2023-03-09   2022-12-09                             2023-03-17   2023-01-12
zirabad Stormwater Drain (R                                                                                                                           or explanation)                                                                                                                                                       2
D 13+320+ to RD 26+223).


 PK-POSID-356470-CW-DIR /
Construction of new T-head S
pur along Ruk loop bund mile
0/0+200, 04 Nos. Stone Stud
                                                                                                                                                      Other (with field f 10,393,757.0            Under Revie                                                                                                           2024-01-2
s, providing stone pitching, st IDA / 72500    Infrastructure Rehabilitation   Prior   Direct Selection   Direct - National                                                              0.00                   2023-04-14   2023-04-17   2023-04-14   2023-04-26                             2023-04-27   2023-06-19
                                                                                                                                                      or explanation)                0            w                                                                                                                         2
one apron along Rukh loop b
und mile 0/0 to 0/5 and Ghu
mra loop bund mile 4/6 & pro
viding stone pitching and apr
on at remaining portions.

 PK-POSID-356505-CW-DIR /
Rehabilitation/Re-Constructio                                                                                                                         Other (with field f                                                                                                                                               2024-01-2
                              IDA / 72500      Infrastructure Rehabilitation   Post    Direct Selection   Direct - National                                               1,957,566.00   0.00     Signed        2023-04-14   2023-04-14   2023-04-14   2023-04-14                             2023-04-27   2023-04-25
n of Regulator Mile 44th of D                                                                                                                         or explanation)                                                                                                                                                       2
esert Canal. Damaged during
floods 2022.

 PK-POSID-433285-CW-RFB /
Rehabilitation of Ruk Loop Bu
                                                                                                                               Single Stage - One E   Other (with field f                         Pending Imp                                                                                                           2024-10-2
nd (Additional Work of Bund    IDA / 72500     Infrastructure Rehabilitation   Post    Request for Bids   Limited - National                                              4,849,138.00   0.00                   2024-06-12                2024-06-12                2024-06-24   2024-06-27   2024-07-28
                                                                                                                               nvelope                or explanation)                             lementation                                                                                                               6
not carried out in Phase-I) be
tween mile 0/0 to mile 0/5.


 PK-POSID-437485-CW-RFB /
                                                                                                                               Single Stage - One E   Other (with field f                         Pending Imp                                                                                                           2024-12-2
Reconstruction/ Rehabilitatio IDA / 72500      Infrastructure Rehabilitation   Post    Request for Bids   Limited - National                                                895,796.00   0.00                   2024-07-10                2024-07-10                2024-07-17   2024-07-22   2024-08-22
                                                                                                                               nvelope                or explanation)                             lementation                                                                                                               2
n of Aqueduct at Miro Khan D
rain RD 0+600.

 PK-POSID-437489-CW-RFB /
Rehabilitation of Suprio Bund
                                                                                                                               Single Stage - One E   Other (with field f                         Pending Imp                                                                                                           2024-12-2
(RD 0+000 to RD 164+000). IDA / 72500          Infrastructure Rehabilitation   Post    Request for Bids   Limited - National                                              1,832,555.00   0.00                   2024-07-10                2024-07-10                2024-07-17   2024-07-22   2024-08-22
                                                                                                                               nvelope                or explanation)                             lementation                                                                                                               2
[Most critical portions affecte
d by Flood-2022].


PK-POSID-437491-CW-RFB /
Restoration of Flood-2022 da
                                                                                                                               Single Stage - One E   Other (with field f                         Pending Imp                                                                                                           2024-12-2
mages of Main Nara Valley (      IDA / 72500   Infrastructure Rehabilitation   Post    Request for Bids   Limited - National                                              1,151,599.00   0.00                   2024-07-10                2024-07-10                2024-07-17   2024-07-22   2024-08-22
                                                                                                                               nvelope                or explanation)                             lementation                                                                                                               2
MNV) Drain Extension from R
D 0+000 to RD 132+000.


 PK-POSID-437493-CW-RFB /
                                                                                                                               Single Stage - One E   Other (with field f                         Pending Imp                                                                                                           2024-12-2
Stone pitching of Left-over p IDA / 72500      Infrastructure Rehabilitation   Post    Request for Bids   Limited - National                                              2,443,406.00   0.00                   2024-07-10                2024-07-10                2024-07-17   2024-07-22   2024-08-22
                                                                                                                               nvelope                or explanation)                             lementation                                                                                                               2
ortions of Aral Wah (RD 0+00
0 to RD 14+000).




                                                                                                                                                                                         Page 4
GOODS
Activity Reference No. /                                                                                                                                                                                                                                                                                                                                                                   Bid Evaluation Report
                                 Loan / Credit N                                                                         Market Approac Procurement Pro Prequalification Estimated Am Actual Amount                        Process St Draft Pre-qualification Prequalification Evalu         Draft Bidding Docum Specific Procurement            Bidding Documents a Proposal Submission /
       Description                                        Component                   Review Type       Method                                                                                                                                                                                                                                                                             and Recommendation                    Signed Contract         Contract Completion
                                        o.                                                                                      h             cess           (Y/N)        ount (US$)      (US$)                               atus         Documents              ation Report                ent / Justification Notice / Invitation                  s Issued        Opening / Minutes
                                                                                                                                                                                                                                                                                                                                                                                                 for Award
                                                                                                                                                                                                                                        Planned         Actual     Planned       Actual      Planned       Actual      Planned       Actual       Planned     Actual  Planned     Actual    Planned     Actual                 Planned       Actual      Planned       Actual

 PK-POSID-353032-GO-RFQ /                          Project Management and Op                        Request for Quota                           Single Stage - One E
                                 IDA / 72500                                       Post                               Limited                                                             107,410.00                0.00   Completed                                                                                   2023-04-03   2023-04-03                                                                                 2023-04-25   2023-04-19   2023-10-22   2023-06-20
Procurement of Vehicles.                           erational Costs                                  tions                                       nvelope


 PK-POSID-364645-GO-RFQ /
                                                   Project Management and Op                        Request for Quota                           Single Stage - One E
Procurement of IT Equipment IDA / 72500                                            Post                               Limited                                                              14,000.00                0.00   Completed                                                                                   2023-06-01   2023-06-02                                                                                 2023-06-08   2023-06-12   2023-07-08   2023-06-15
                                                   erational Costs                                  tions                                       nvelope
for Office use.


 PK-POSID-378808-GO-RFQ /                          Project Management and Op                        Request for Quota                           Single Stage - One E
                             IDA / 72500                                           Post                               Open - National                                                      98,333.00                0.00   Completed                                                                                   2023-08-25   2023-08-29                                                                                 2023-09-22   2023-09-15   2024-03-20   2023-12-14
Procurement of 3Nos: vehicle                       erational Costs                                  tions                                       nvelope
s.

 PK-POSID-389120-GO-RFQ /
                                                   Project Management and Op                        Request for Quota                           Single Stage - One E
Procurement of Goods for Re      IDA / 72500                                       Post                               Limited                                                              34,026.00                0.00   Completed                                                                                   2023-10-26   2023-10-27                                                                                 2023-11-06   2023-11-16   2024-01-05   2023-12-05
                                                   erational Costs                                  tions                                       nvelope
novation of Office Conferenc
e Room.



NON CONSULTING SERVICES
Activity Reference No. /                                                                                                                                                                                                                                                                                                                                                                   Bid Evaluation Report
                                 Loan / Credit N                                                                         Market Approac Procurement Pro Prequalification Estimated Am Actual Amount                        Process St Draft Pre-qualification Prequalification Evalu         Draft Bidding Docum Specific Procurement            Bidding Documents a Proposal Submission /
       Description                                        Component                   Review Type       Method                                                                                                                                                                                                                                                                             and Recommendation                    Signed Contract         Contract Completion
                                        o.                                                                                      h             cess           (Y/N)        ount (US$)      (US$)                               atus         Documents              ation Report                ent / Justification Notice / Invitation                  s Issued        Opening / Minutes
                                                                                                                                                                                                                                                                                                                                                                                                 for Award
                                                                                                                                                                                                                                        Planned         Actual     Planned       Actual      Planned       Actual      Planned       Actual       Planned     Actual  Planned     Actual    Planned     Actual                 Planned       Actual      Planned       Actual




CONSULTING FIRMS
Activity Reference No. /                                                                                                                                                                                                                                                                                                                                                            Combined Evaluation
                                 Loan / Credit N                                                                         Market Approac          Contract Type         Estimated Amo Actual Amount                                                    Expression of Interest Short List and Draft R Request for Proposals Opening of Technical                Evaluation of Technic
       Description                                        Component                   Review Type        Method                                                                                    Process Status           Terms of Reference                                                                                                                                      Report and Draft Neg            Signed Contract         Contract Completion
                                        o.                                                                                      h                                         unt (US$)      (US$)                                                               Notice          equest for Proposals        as Issued         Proposals / Minutes                     al Proposal
                                                                                                                                                                                                                                                                                                                                                                                       otiated Contract
                                                                                                                                                                                                                            Planned      Actual        Planned      Actual      Planned       Actual      Planned       Actual      Planned       Actual      Planned      Actual    Planned     Actual           Planned       Actual      Planned       Actual
 PK-POSID-364945-CS-CQS /                          Project Management and Op                        Consultant Qualifi
                                IDA / 72500                                        Post                                  Limited                                            75,000.00           0.00   Signed              2023-06-02   2023-06-08                              2023-06-12   2023-06-23                                                                                 2023-06-19   2023-07-26   2023-06-26   2023-07-31   2026-06-25
The Hiring of Internal Audit Fi                    erational Costs                                  cation Selection
rm.

 PK-POSID-364947-CS-CQS /
Environmental and Social Saf
                                                   Project Management and Op                        Consultant Qualifi
eguard Management Implem IDA / 72500                                               Post                                  Limited                                           100,000.00           0.00   Signed              2023-06-02   2023-06-08                              2023-06-12   2023-07-05                                                                                 2023-06-19   2023-07-25   2023-06-26   2023-07-31   2024-03-22
                                                   erational Costs                                  cation Selection
entation and Monitoring Of R
ehabilitation of Dhoro Puran
Works.

 PK-POSID-366420-CS-QCBS /
                                                   Institutional Strengthening f
Hiring of Consultancy Service                                                                       Quality And Cost-    Open - Internationa
                              IDA / 72500          or Resilience and Technical     Prior                                                                                  1,200,000.00          0.00   Canceled            2023-06-12                 2023-06-19                2023-08-18                                          2023-09-15                2023-09-29                2023-11-03                2023-12-01                2024-11-30
s for Designing Flood Detenti                                                                       Based Selection      l
                                                   Assistance
on Weirs and Flood Affected
Embankments.

 PK-POSID-368109-CS-CQS /
The Hiring of Consultancy Se                       Institutional Strengthening f
                                                                                                    Consultant Qualifi
rvices for Remodeling and Re IDA / 72500           or Resilience and Technical     Post                                  Open - National                                   298,708.00           0.00   Signed              2023-06-21   2023-07-03    2023-07-06   2023-08-18   2023-08-21   2023-10-05                                                                                 2023-08-28   2023-11-07   2023-09-18   2023-11-15   2024-09-16
                                                                                                    cation Selection
designing of the Irrigation an                     Assistance
d Drainage Network Damage
d During the Flood 2022.

 PK-POSID-369797-CS-CQS /                          Institutional Strengthening f
                                                                                                    Consultant Qualifi
Third Party Monitoring & Vali    IDA / 72500       or Resilience and Technical     Post                                  Open - National                                   250,000.00           0.00   Signed              2023-07-01   2023-07-17    2023-07-17   2023-07-24   2023-08-23   2023-09-11                                                                                 2023-08-30   2023-09-18   2023-09-20   2023-09-25   2024-12-18
                                                                                                    cation Selection
dation Under SFERP.                                Assistance


 PK-POSID-375713-CS-CQS /
Hiring of Consultancy Service
s for preparation of Environm                      Project Management and Op                        Consultant Qualifi
                              IDA / 72500                                          Post                                  Open - National                                   200,000.00           0.00   Signed              2023-08-07   2023-08-08    2023-08-22   2023-08-28   2023-09-18   2023-10-06                                                                                 2023-10-02   2023-11-09   2023-10-12   2023-11-17   2024-10-11
ent and Social management                          erational Costs                                  cation Selection
plans and other related docu
mentation of leftover works d
amaged during Floods 2022.

 PK-POSID-342908-CS-QCBS /
                                                   Institutional Strengthening f
Forensic Analysis of 2022 Flo                                                                       Quality And Cost-    Open - Internationa
                              IDA / 72500          or Resilience and Technical     Prior                                                                                  1,500,000.00          0.00   Canceled            2023-02-16   2023-10-30    2023-02-20                2023-04-06                                          2023-05-11                2023-06-10                2023-06-27                2023-07-07                2024-07-06
ods and Mitigation Options o                                                                        Based Selection      l
                                                   Assistance
n the Right Bank of Indus.


 PK-POSID-391730-CS-QCBS /
                                                   Institutional Strengthening f
Flood Risk Assessment and P                                                                         Quality And Cost-    Open - Internationa                                                           Under Implement
                              IDA / 72500          or Resilience and Technical     Prior                                                                                  3,760,000.00          0.00                       2023-11-06   2023-12-03    2023-11-07   2023-12-12   2023-12-22   2024-03-15                             2024-01-26   2024-04-24   2024-02-26   2024-06-13   2024-03-12                2024-04-05                2025-04-05
roposal of Mitigation Measure                                                                       Based Selection      l                                                                             ation
                                                   Assistance
s for the Right Bank of Indus
River.

 PK-POSID-401757-CS-CQS /
                                                   Institutional Strengthening f
Pollution Source Identificatio                                                                      Consultant Qualifi                                                                                 Under Implement
                                 IDA / 72500       or Resilience and Technical     Post                                  Open - National                                   250,000.00           0.00                       2024-01-11   2024-01-10    2024-01-31   2024-02-14   2024-03-18   2024-06-04                                                                                 2024-03-25                2024-04-04                2025-04-04
n Study for Ecological Restor                                                                       cation Selection                                                                                   ation
                                                   Assistance
ation of Manchar Lake.




INDIVIDUAL CONSULTANTS
Activity Reference No. /
                                 Loan / Credit N                                                                         Market Approac          Contract Type         Estimated Amo Actual Amount                                                    Invitation to Identifie Draft Negotiated Cont
       Description                                        Component                   Review Type        Method                                                                                    Process Status           Terms of Reference                                                              Signed Contract         Contract Completion
                                        o.                                                                                      h                                         unt (US$)      (US$)                                                        d/Selected Consultant            ract
                                                                                                                                                                                                                            Planned      Actual        Planned      Actual      Planned       Actual      Planned       Actual      Planned       Actual
 PK-POSID-344014-CS-CDS /
                                                   Institutional Strengthening f
Development & Integration o                                                                                              Direct - Internation
                             IDA / 72500           or Resilience and Technical     Post             Direct Selection                                                       949,373.00           0.00   Signed              2023-02-20   2023-03-05    2023-03-01   2023-03-15                             2023-04-04   2023-04-06   2024-04-02
f Kirthar Model and Operatio                                                                                             al
                                                   Assistance
ns & Maintenance of Data Ce
nter.

 PK-POSID-346415-CS-INDV /
                                                   Project Management and Op                        Individual Consult
The Hiring of Project Director   IDA / 72500                                       Post                                  Open - National                                   101,533.00           0.00   Signed              2023-03-01   2023-03-17    2023-03-29   2023-06-02   2023-04-03   2023-06-02   2023-04-12   2023-06-13   2025-04-09
                                                   erational Costs                                  ant Selection
(Market Based).


 PK-POSID-349520-CS-INDV /
                                                   Project Management and Op                        Individual Consult
The Hiring of Gender Speciali IDA / 72500                                          Post                                  Open - National                                    12,915.00           0.00   Terminated          2023-03-14   2022-11-20    2023-04-06   2022-12-16   2023-04-07   2022-12-26   2023-04-13   2023-04-04   2024-04-11
                                                   erational Costs                                  ant Selection
st for SFERP.


 PK-POSID-349526-CS-INDV /
                                                   Project Management and Op                        Individual Consult
The Hiring of Environment Co IDA / 72500                                           Post                                  Open - National                                    12,915.00           0.00   Terminated          2023-03-14   2022-11-20    2023-04-06   2022-12-16   2023-04-07   2022-12-26   2023-04-13   2023-01-27   2024-04-11
                                                   erational Costs                                  ant Selection
nsultant for SFERP.


 PK-POSID-349551-CS-INDV /
                                                   Project Management and Op                        Individual Consult
The Hiring of Social Safeguar    IDA / 72500                                       Post                                  Open - National                                    12,915.00           0.00   Signed              2023-03-14   2022-11-20    2023-04-06   2022-12-16   2023-04-07   2022-12-26   2023-04-13   2023-04-03   2024-04-11
                                                   erational Costs                                  ant Selection
d Consultant for SFERP.




                                                                                                                                                                                                                                             Page 5
 PK-POSID-418244-CS-CDS /                     Project Management and Op
                              IDA / 72500                                 Post    Direct Selection     Direct - National    18,200.00   0.00   Signed            2024-03-22   2024-03-22    2024-04-01   2024-03-29                2024-04-25   2025-04-24
The Hiring of Gender Speciali                 erational Costs
st.

 PK-POSID-430998-CS-INDV /
The Hiring of Procurement an                  Project Management and Op           Individual Consult
                                IDA / 72500                               Prior                        Open - National      75,404.00   0.00   Under Review      2024-05-31                 2024-06-27                2024-07-01   2024-07-11   2027-12-31
d Contract Management Spe                     erational Costs                     ant Selection
cialist (Individual Consultant)
.

 PK-POSID-435547-CS-CDS /                     Project Management and Op                                                                        Pending Impleme
                               IDA / 72500                                Post    Direct Selection     Direct - National   148,904.00   0.00                     2024-06-25                 2024-06-28                             2024-07-19   2027-12-31
Senior Water Management S                     erational Costs                                                                                  ntation
pecialist.

 PK-POSID-435550-CS-CDS /                     Project Management and Op                                                                        Pending Impleme
                               IDA / 72500                                Post    Direct Selection     Direct - National   114,522.00   0.00                     2024-06-25                 2024-06-28                             2024-07-19   2027-12-31
Finance Consultant.                           erational Costs                                                                                  ntation


 PK-POSID-435553-CS-CDS /                     Project Management and Op                                                                        Pending Impleme
                               IDA / 72500                                Post    Direct Selection     Direct - National    38,149.00   0.00                     2024-06-25                 2024-06-28                             2024-07-19   2027-12-31
Structural Safety Engineer.                   erational Costs                                                                                  ntation


 PK-POSID-435570-CS-CDS /                     Project Management and Op                                                                        Pending Impleme
                               IDA / 72500                                Post    Direct Selection     Direct - National    74,944.00   0.00                     2024-06-25                 2024-06-28                             2024-07-19   2027-12-31
Electro Hydro Consultant.                     erational Costs                                                                                  ntation


 PK-POSID-435572-CS-CDS /                     Project Management and Op                                                                        Pending Impleme
                           IDA / 72500                                    Post    Direct Selection     Direct - National    97,218.00   0.00                     2024-06-25                 2024-06-28                             2024-07-19   2027-12-31
Water Management Specialis                    erational Costs                                                                                  ntation
t.

 PK-POSID-435554-CS-CDS /                     Project Management and Op                                                                        Pending Impleme
                               IDA / 72500                                Post    Direct Selection     Direct - National    62,023.00   0.00                     2024-07-10                 2024-07-26                             2024-08-16   2028-01-28
Fiduciary Consultant.                         erational Costs                                                                                  ntation




                                                                                                                                                                                   Page 6