PROCUREMENT PLAN (Textual Part) Project information: Sindh Flood Emergency Rehabilitation Project (P179981) Project Implementation agency(ies): (i) Sindh Planning & Development Department (ii) Sindh Irrigation Department Date of the Procurement Plan: December 2022 Period covered by this Procurement Plan: June 30 2024 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” November 2020 (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in public procurement rules such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: 1) The eligibility of bidders shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. 2) For national open competitive procurement, only the model procurement documents acceptable to the World Bank, shall be used. 3) The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 4) Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts 5) Access to procurement opportunities shall not be restricted to firms that have pre-registered and/or paid a registration fee. 6) No preference of any kind shall be given to national bidders in the bidding process. 7) Procurement methods that use two-envelope process and rated criteria shall be subject to Bank’s prior concurrence When other national procurement arrangements (other than national open competitive procurement) are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is not allowed Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework1 Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines2 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; 1[Drafting note: This document shall be signed by bidders/proposers/consultants and submitted as part of their bids/proposals. In addition, this document shall be signed by the winning bidder/consultant and incorporated as part of the contract.] 2Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;3 (ii) to be a nominated4 sub-contractor, sub-consultant, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank- financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect5 all accounts, records, and other documents relating to 3 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification or initial selection), expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 4A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the bidding document) is one which has been: (i) included by the bidder in its pre-qualification or initial selection application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 5Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact- finding activities undertaken by the Bank or persons appointed by the Bank to address specific the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Proposer/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Proposer/ Consultant: Title of the person signing the Letter: matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Pakistan : Sindh Flood Emergency Rehabilitation Project PLAN General Information Country: Pakistan 2023-01-17 Bank’s Approval Date of the Original Procurement Plan: 2024-07-10 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P179981 GPN Date: 2023-01-19 Project Name: Sindh Flood Emergency Rehabilitation Project Loan / Credit No: IDA / 72500 Province of Sindh Irrigation Department Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned PK-POSID-336211-CW-RFB / Rehabilitation/ Construction Single Stage - One E Other (with field f 2024-03-1 IDA / 72500 Infrastructure Rehabilitation Post Request for Bids Open - National 5,681,818.00 0.00 Signed 2023-01-13 2022-12-19 2023-01-13 2023-01-24 2023-02-14 2023-02-23 2023-03-17 2023-03-13 2023-04-15 of Additional Outfall Regulato nvelope or explanation) 1 r Along Ochitto Outfall Drain and Leading Channel. PK-POSID-336212-CW-RFB / Single Stage - One E Other (with field f Pending Imp 2024-03-1 Rehabilitation of Main East Br IDA / 72500 Infrastructure Rehabilitation Post Request for Bids Open - National 1,006,738.00 0.00 2023-01-13 2023-01-13 2023-01-24 2023-02-23 2023-03-13 nvelope or explanation) lementation 1 anch Nawabshah. PK-POSID-336213-CW-RFB / Single Stage - One E Other (with field f 2024-03-1 Rehabilitation of Shikarpur Br IDA / 72500 Infrastructure Rehabilitation Post Request for Bids Open - National 258,748.00 0.00 Signed 2023-01-13 2022-12-19 2023-01-13 2023-01-24 2023-02-14 2023-02-23 2023-03-06 2023-03-13 2023-04-06 nvelope or explanation) 1 . Drain system. PK-POSID-336214-CW-RFB / Rehabilitation of Pharho Esca Single Stage - One E Other (with field f 2024-03-1 pe from RD 0+000 to 30+00 IDA / 72500 Infrastructure Rehabilitation Post Request for Bids Open - National 139,273.00 0.00 Signed 2023-01-13 2022-12-19 2023-01-13 2023-01-24 2023-02-14 2023-02-23 2023-03-29 2023-03-13 2023-06-07 nvelope or explanation) 1 0 Both Sides in KhairpurGam bo Sub Division of Nasir Divis ion. PK-POSID-336215-CW-RFB / Raising and Rehabilitation (E arthwork) along Oderolal Esc Single Stage - One E Other (with field f 2024-03-1 ape from RD 0+000 to 71+0 IDA / 72500 Infrastructure Rehabilitation Post Request for Bids Open - National 2,250,000.00 0.00 Signed 2023-01-13 2022-12-19 2023-01-13 2023-01-24 2023-02-14 2023-02-23 2023-03-03 2023-03-13 2023-04-04 nvelope or explanation) 1 00 NIP Side i/c installation of new gates to increase capaci ty of water to enable escape discharge in Indus River. PK-POSID-336216-CW-RFB / Single Stage - One E Other (with field f 2024-03-1 IDA / 72500 Infrastructure Rehabilitation Post Request for Bids Open - National 652,658.00 0.00 Canceled 2023-01-13 2023-01-13 2023-01-24 2023-02-23 2023-03-13 Rehabilitation of Karampur Ri nvelope or explanation) 1 ng Bund. PK-POSID-336217-CW-RFB / Single Stage - One E Other (with field f 2024-03-1 IDA / 72500 Infrastructure Rehabilitation Post Request for Bids Open - National 1,590,120.00 0.00 Signed 2023-01-13 2022-12-19 2023-01-13 2023-01-24 2023-02-14 2023-02-23 2023-03-03 2023-03-13 2023-04-14 Rehabilitation of Suprio Bund nvelope or explanation) 1 . PK-POSID-336218-CW-RFB / Package No. 1 Lot No. 1 Floo d Detention Dam Lat-01 (DD/ Single Stage - One E Other (with field f 2024-03-1 W-L01 along LatNai). IDA / 72500 Infrastructure Rehabilitation Post Request for Bids Open - National 7,586,543.00 0.00 Signed 2023-01-13 2022-12-26 2023-01-13 2023-01-25 2023-01-31 2023-01-31 2023-03-02 2023-02-20 2023-03-20 2023-03-29 nvelope or explanation) 8 Lot No.2 Floo d Detention Dam Lat-02 (DD/ W-L02 along LatNai). PK-POSID-336219-CW-RFB / Package No. 2 Lot No. 1 Floo d Detention Dam Lat-03 (DD/ Single Stage - One E Other (with field f 2024-03-1 W-L03 along LatNai). IDA / 72500 Infrastructure Rehabilitation Post Request for Bids Open - National 7,919,065.00 0.00 Signed 2023-01-13 2022-12-26 2023-01-13 2023-01-25 2023-01-31 2023-01-31 2023-03-02 2023-02-20 2023-03-20 2023-04-11 nvelope or explanation) 8 Lot No. 2 Flo od Detention Dam Lat-04 (D D/W-L04 along LatNai). PK-POSID-336220-CW-RFB / Single Stage - One E Other (with field f 2024-03-1 Package No.3 Flood Detentio IDA / 72500 Infrastructure Rehabilitation Post Request for Bids Open - National 4,597,684.00 0.00 Signed 2023-01-13 2022-12-26 2023-01-13 2023-01-25 2023-01-31 2023-01-31 2023-03-02 2023-02-20 2023-03-20 2023-04-11 nvelope or explanation) 8 n Dam Mole-02 (DD/W-M2 al ong Mole Nai). PK-POSID-336221-CW-RFB / Package No. 4 Lot No. 1 Floo d Detention Dam Mole-03 (D Single Stage - One E Other (with field f 2024-03-1 D/W-M3 along Mole Nai). IDA / 72500 Infrastructure Rehabilitation Post Request for Bids Open - National 7,993,696.00 0.00 Signed 2023-01-13 2022-12-26 2023-01-13 2023-01-25 2023-01-31 2023-01-31 2023-03-02 2023-03-07 2023-03-20 2023-04-21 nvelope or explanation) 8 Lot No. 2 Floo d Detention Dam Mole-04 (D D/W-M4 along Mole Nai). PK-POSID-336223-CW-RFB / Package No. 5 Lot No. 1 Floo d Detention Dam Mole-05 (D Single Stage - One E Other (with field f 2024-03-1 D/W-M5 along Mole Nai). IDA / 72500 Infrastructure Rehabilitation Post Request for Bids Open - National 8,779,468.00 0.00 Signed 2023-01-14 2022-12-26 2023-01-14 2023-01-25 2023-01-31 2023-01-31 2023-03-02 2023-02-20 2023-03-20 2023-04-14 nvelope or explanation) 8 Lot No. 2 Floo d Detention Dam Mole-06 (D D/W-M6 along Mole Nai). PK-POSID-336225-CW-RFB / Package No. 6 Lot No.1 Floo d Detention Dam Mole-07 (D Single Stage - One E Other (with field f 2024-03-1 D/W-M7 along Mole Nai). IDA / 72500 Infrastructure Rehabilitation Post Request for Bids Open - National 7,608,233.00 0.00 Signed 2023-01-14 2022-12-26 2023-01-14 2023-01-25 2023-01-31 2023-01-31 2023-03-02 2023-03-07 2023-03-20 2023-04-25 nvelope or explanation) 8 Lot No. 2 Flo od Detention Dam Mole -08 ( DD/W-M8 along Mole Nai). PK-POSID-336067-CW-DIR / Other (with field f 2023-04-2 Rehabilitation OF Manchar C IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 4,251,592.00 0.00 Completed 2023-01-13 2022-10-21 2023-01-13 2022-10-24 2023-01-21 2022-11-17 or explanation) 1 ONTAINING BUND (RD 0+000 TO 27+000 ). PK-POSID-336093-CW-DIR / Other (with field f 2023-04-2 REHABILITATION OF DANISTA IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 3,682,097.00 0.00 Completed 2023-01-13 2022-11-14 2023-01-13 2022-11-15 2023-01-21 2022-12-08 or explanation) 1 R CANAL (RD 0+000 TO 27+ 440). PK-POSID-336083-CW-DIR / Other (with field f 2023-04-2 REHABILITATION OF DHORO IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 2,427,760.00 0.00 Signed 2023-01-13 2022-10-21 2023-01-13 2022-10-24 2023-01-21 2022-11-17 or explanation) 1 PURAN RD 176+400 to 210+ 000. PK-POSID-336069-CW-DIR / REHABILITATION OF MANCHA Other (with field f 2023-04-2 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 4,483,243.00 0.00 Completed 2023-01-13 2022-10-21 2023-01-13 2022-10-24 2023-01-21 2022-11-17 R CONTAINING BUND (RD 54 or explanation) 1 +000 TO 77+000 ). Page 1 PK-POSID-336074-CW-DIR / Other (with field f 2023-04-2 Rehabilitation of FP Bund (RD IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 4,543,288.00 0.00 Signed 2023-01-13 2022-10-28 2023-01-13 2022-10-31 2023-01-21 2022-12-01 or explanation) 1 380+000 to RD 445+000). PK-POSID-336077-CW-DIR / Rehabilitation of FP Bund (RD Other (with field f 2023-04-2 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 4,748,317.00 0.00 Completed 2023-01-13 2022-10-28 2023-01-13 2022-10-31 2023-01-21 2022-12-01 490+000 to RD 502+000 & R or explanation) 1 D 263+000 to RD 220+000). PK-POSID-336079-CW-DIR / Other (with field f 2023-04-2 Rehabilitation of FP Bund (RD IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 4,492,892.00 0.00 Signed 2023-01-13 2022-10-28 2023-01-13 2022-10-31 2023-01-21 2022-12-01 or explanation) 1 220+000 to RD 169+000). PK-POSID-336085-CW-DIR / REHABILITATION OF DHORO Other (with field f 2023-04-2 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 4,318,122.00 0.00 Signed 2023-01-13 2022-10-21 2023-01-13 2022-10-24 2023-01-21 2022-11-17 PURAN RD 210+000 TO 222 or explanation) 1 +130 AND MAIN DRAIN RD 2 12+300 TO 217+600. PK-POSID-336075-CW-DIR / Other (with field f 2023-04-2 Rehabilitation of FP Bund (RD IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 4,604,680.00 0.00 Signed 2023-01-13 2022-10-21 2023-01-13 2022-10-24 2023-01-21 2022-11-17 or explanation) 1 445+000 to RD 490+000). PK-POSID-335890-CW-DIR / Other (with field f 2023-02-1 Plugging and Strengthening IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 635,481.00 0.00 Completed 2023-01-12 2022-09-26 2023-01-12 2022-09-28 2023-01-20 2022-10-22 or explanation) 9 of Breach along Saifullah Ma gsi Branch. PK-POSID-335912-CW-DIR / Other (with field f 2023-02-1 Plugging, Strengthening Rest IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 930,558.00 0.00 Completed 2023-01-12 2022-10-05 2023-01-12 2022-10-07 2023-01-20 2022-10-27 or explanation) 9 oration and Rehabilitation of Dhamrah Wah. PK-POSID-335914-CW-DIR / Replacement / Supply and In stallation of Motor Pump (10 Other (with field f 2023-04-2 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 1,074,545.00 0.00 Completed 2023-01-12 2022-10-05 2023-01-12 2022-10-07 2023-01-20 2022-10-27 0 H.P) Including All Accessori or explanation) 0 es Along Ghaar, Shahmeer, Mehar, Mashori, K.N.Shah, Mi ro Khan and Agani Pumping Stations. PK-POSID-335916-CW-DIR / Plugging and Strengthening Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 977,477.00 0.00 Completed 2023-01-12 2022-10-14 2023-01-12 2022-10-17 2023-01-20 2022-11-04 of Breach along Main Nara V or explanation) 9 alley (MNV) Drain at RD 280. PK-POSID-335928-CW-DIR / Other (with field f Under Imple 2023-02-1 Closing of cuts alog Rohri Mai IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 469,559.00 0.00 2023-01-12 2022-10-14 2023-01-12 2022-10-17 2023-01-20 or explanation) mentation 9 n Canal, Moro Division. PK-POSID-335933-CW-DIR / Plugging And Strengthening Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 1,022,523.00 0.00 Completed 2023-01-12 2022-10-28 2023-01-12 2022-10-31 2023-01-20 2022-11-28 Of Relief Cut Along Johi Branc or explanation) 9 h Along Rd 80 To Rd 86 And Rd 95 To Rd 98. PK-POSID-335862-CW-DIR / Other (with field f 2023-02-1 Plugging and Strengthening IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 226,695.00 0.00 Signed 2023-01-12 2022-09-26 2023-01-12 2022-09-28 2023-01-20 2022-10-22 or explanation) 9 of Breach along FP Bund alon g 169+000. PK-POSID-335917-CW-DIR / Plugging and Strengthening Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 309,602.00 0.00 Completed 2023-01-12 2022-10-14 2023-01-12 2022-10-17 2023-01-20 2022-11-04 of Breach along Main Nara V or explanation) 9 alley (MNV) Drain at RD 330. PK-POSID-335893-CW-DIR / Plugging and Strengthening Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 407,933.00 0.00 Completed 2023-01-12 2022-10-05 2023-01-12 2022-10-07 2023-01-20 2022-10-27 of Breaches / Cuts Along Gha or explanation) 9 r Main Drain & Leading Chan nel. PK-POSID-335905-CW-DIR / Other (with field f 2023-02-1 Plugging and Strengthening IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 782,058.00 0.00 Completed 2023-01-12 2022-10-05 2023-01-12 2022-10-07 2023-01-20 2022-10-27 or explanation) 9 of Breaches / Cuts Along Miro Khan Main Drain. PK-POSID-335919-CW-DIR / Plugging, Strengthening and Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 346,364.00 0.00 Completed 2023-01-12 2022-10-14 2023-01-12 2022-10-17 2023-01-20 2022-11-04 Stone Pitching of Breach alon or explanation) 9 g Superio Bund RD 12. PK-POSID-335920-CW-DIR / Plugging, Strengthening and Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 249,294.00 0.00 Completed 2023-01-12 2022-10-14 2023-01-12 2022-10-17 2023-01-20 2022-11-04 Stone Pitching of Breach alon or explanation) 9 g Superio Bund RD 28. PK-POSID-336089-CW-DIR / REMODELING AND REHABILIT Other (with field f 2023-04-2 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 6,486,130.00 0.00 Signed 2023-01-13 2022-10-28 2023-01-13 2022-10-31 2023-01-21 2022-11-28 ATION OF ARAL HEAD REGUL or explanation) 1 ATOR (MC RD 0+000). PK-POSID-336087-CW-DIR / REHABILITATION OF OUTFALL Other (with field f 2023-04-2 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 2,482,485.00 0.00 Signed 2023-01-13 2022-10-21 2023-01-13 2022-10-24 2023-01-21 2022-11-17 STRUCTURE AT RD 210+000 or explanation) 1 OF DHORO PURAN. PK-POSID-336070-CW-DIR / REHABILITATION OF MANCHA Other (with field f 2023-04-2 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 4,542,517.00 0.00 Completed 2023-01-13 2022-10-21 2023-01-13 2022-10-24 2023-01-21 2022-11-17 R CONTAINING BUND (RD 77 or explanation) 1 +000 TO 100+000). PK-POSID-336071-CW-DIR / Other (with field f 2023-04-2 Rehabilitation of FP Bund (RD IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 4,475,187.00 0.00 Completed 2023-01-13 2022-10-21 2023-01-13 2022-10-24 2023-01-21 2022-11-17 or explanation) 1 160+000 to RD 210+000). PK-POSID-335923-CW-DIR / Plugging, Strengthening and Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 60,393.00 0.00 Completed 2023-01-12 2022-10-14 2023-01-12 2022-10-17 2023-01-20 2022-11-04 Stone Pitching of Breach alon or explanation) 9 g Superio Bund RD 42. PK-POSID-336091-CW-DIR / Other (with field f 2023-04-2 REHABILITATION OF LEFT AR IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 3,156,718.00 0.00 Signed 2023-01-13 2022-10-28 2023-01-13 2022-10-31 2023-01-21 2022-12-01 or explanation) 1 AL BUND RD 0+000 TO RD 1 9+000. PK-POSID-335931-CW-DIR / Other (with field f 2023-02-1 Repair of Rain Damages of S IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 1,397,355.00 0.00 Signed 2023-01-12 2022-10-14 2023-01-12 2022-10-17 2023-01-20 2022-11-04 or explanation) 9 mall Dams Under Small Dam s Organization. Page 2 PK-POSID-335855-CW-DIR / Plugging, Strengthening & St Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 219,056.00 0.00 Signed 2023-01-12 2022-09-26 2023-01-12 2022-09-28 2023-01-20 2022-10-22 one Pitching of Relief Cut Lar or explanation) 9 kana Sehwan Bund along Mil e 95/6. PK-POSID-336080-CW-DIR / Other (with field f 2023-04-2 REHABILITATION OF DHORO IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 3,250,317.00 0.00 Signed 2023-01-13 2022-10-21 2023-01-13 2022-10-24 2023-01-21 2022-11-17 or explanation) 1 PURAN RD 110+000 TO 143 +330. PK-POSID-335851-CW-DIR / Plugging and Strengthening Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 1,249,943.00 0.00 Completed 2023-01-12 2022-09-26 2023-01-12 2022-09-28 2023-01-20 2022-10-22 of Relief Cut along Manchar or explanation) 9 Containing Bund at RD 52+0 00. PK-POSID-335854-CW-DIR / Plugging and Strengthening Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 1,133,842.00 0.00 Completed 2023-01-12 2022-09-26 2023-01-12 2022-09-28 2023-01-20 2022-10-22 of Breach along Main Nara V or explanation) 9 aley (MNV) Drain at RD 8+06 8. PK-POSID-335887-CW-DIR / Other (with field f 2023-02-1 Plugging and Strengthening IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 180,708.00 0.00 Completed 2023-01-12 2022-09-26 2023-01-12 2022-09-28 2023-01-20 2022-10-22 or explanation) 9 of Breach along FP Bund alon g RD 476+000. PK-POSID-336081-CW-DIR / Other (with field f 2023-04-2 REHABILITATION OF DHORO IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 3,491,000.00 0.00 Signed 2023-01-13 2022-10-21 2023-01-13 2022-10-24 2023-01-21 2022-11-17 or explanation) 1 PURAN RD 143+330 TO 176 +400. PK-POSID-335925-CW-DIR / Plugging, Strengthening and Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 189,836.00 0.00 Completed 2023-01-12 2022-10-14 2023-01-12 2022-10-17 2023-01-20 2022-11-04 Stone Pitching of Breach alon or explanation) 9 g Superio Bund RD 52. PK-POSID-335929-CW-DIR / Other (with field f 2023-02-1 Repair of Rain Damages Sma IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 1,912,465.00 0.00 Completed 2023-01-12 2022-10-14 2023-01-12 2022-10-17 2023-01-20 2022-11-04 or explanation) 9 ll Dams Under Sindh Resilien ce Project (SRP). PK-POSID-335898-CW-DIR / Plugging and Strengthening Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 493,189.00 0.00 Completed 2023-01-12 2022-10-05 2023-01-12 2022-10-07 2023-01-20 2022-10-27 of Breaches Along K.N Shah or explanation) 9 Main Drain & Leading Chann el. PK-POSID-335927-CW-DIR / Plugging, Strengthening and Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 44,676.00 0.00 Completed 2023-01-12 2022-10-14 2023-01-12 2022-10-17 2023-01-20 2022-11-04 Stone Pitching of Breach alon or explanation) 9 g Superio Bund RD 82. PK-POSID-335858-CW-DIR / Plugging, Strengthening & St Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 906,846.00 0.00 Completed 2023-01-12 2022-10-05 2023-01-12 2022-10-07 2023-01-20 2022-10-22 one Pitching of Relief Cut Lar or explanation) 9 kana Sehwan Bund along Mil e 97/2. PK-POSID-335873-CW-DIR / Other (with field f 2023-02-1 Plugging and Strengthening IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 1,452,498.00 0.00 Completed 2023-01-12 2022-09-26 2023-01-12 2022-09-28 2023-01-20 2022-10-22 or explanation) 9 of Breach along FP Bund alon g RD 340+000. PK-POSID-335915-CW-DIR / Plugging and Strengthening Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 802,253.00 0.00 Completed 2023-01-12 2022-10-14 2023-01-12 2022-10-17 2023-01-20 2022-11-04 of Breach along Main Nara V or explanation) 9 alley (MNV) Drain at RD 210. PK-POSID-335821-CW-DIR / Plugging and Strengthening Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 1,135,696.00 0.00 Completed 2023-01-12 2022-09-26 2023-01-12 2022-09-28 2023-01-20 2022-10-22 of Relief Cut along Manchar or explanation) 9 Containing Bund at RD 14+0 00. PK-POSID-335903-CW-DIR / Plugging and Strengthening Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 385,539.00 0.00 Completed 2023-01-12 2022-10-05 2023-01-12 2022-10-07 2023-01-20 2022-10-27 of Breaches / Cuts Along Sha or explanation) 9 hdad Kot Branch Drain. PK-POSID-336068-CW-DIR / REHABILITATION OF MANCHA Other (with field f 2023-04-2 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 4,538,878.00 0.00 Signed 2023-01-13 2022-10-21 2023-01-13 2022-10-24 2023-01-21 2022-11-17 R CONTAINING BUND (RD 27 or explanation) 1 +000 TO 54+000 ). PK-POSID-336072-CW-DIR / Other (with field f 2023-04-2 Rehabilitation of FP Bund (RD IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 4,524,135.00 0.00 Signed 2023-01-13 2022-10-28 2023-01-13 2022-10-31 2023-01-21 2022-12-01 or explanation) 1 325+000 to RD 380+000). PK-POSID-336094-CW-DIR / Other (with field f 2023-04-2 REHABILITATION OF DANISTA IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 3,633,010.00 0.00 Completed 2023-01-13 2022-11-14 2023-01-13 2022-11-15 2023-01-21 2022-12-08 or explanation) 1 R CANAL (RD 27+440 TO 56 +434). PK-POSID-335860-CW-DIR / Plugging, Strengthening & St Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 2,231,284.00 0.00 Completed 2023-01-12 2022-09-26 2023-01-12 2022-09-28 2023-01-20 2022-10-22 one Pitching of Relief Cut Lar or explanation) 9 kana Sehwan Bund along Mil e 99/3. PK-POSID-335909-CW-DIR / Other (with field f 2023-02-1 Plugging and Strengthening IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 2,075,286.00 0.00 Signed 2023-01-12 2022-10-05 2023-01-12 2022-10-07 2023-01-20 2022-10-27 or explanation) 9 of Breach Along F.P Bund Rd 432. PK-POSID-335932-CW-DIR / Repair of Gaj Diversion Bund Other (with field f 2023-02-1 ledge and stone apron from IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 1,342,347.00 0.00 Signed 2023-01-12 2022-10-14 2023-01-12 2022-10-17 2023-01-20 2022-11-04 or explanation) 9 RD 3-11, Repair of Gaj Divers ion Bund stone apron from R D 15-32.5. PK-POSID-335867-CW-DIR / Other (with field f 2023-02-1 Plugging and Strengthening IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 552,124.00 0.00 Completed 2023-01-12 2022-09-26 2023-01-12 2022-09-28 2023-01-20 2022-10-22 or explanation) 9 of Breach along FP Bund alon g RD 215+000. PK-POSID-335853-CW-DIR / Plugging and Strengthening Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 1,361,326.00 0.00 Completed 2023-01-12 2022-09-26 2023-01-12 2022-09-28 2023-01-20 2022-10-22 of Breach along Main Nara V or explanation) 9 aley (MNV) Drain at RD 2+31 8. PK-POSID-335908-CW-DIR / Other (with field f 2023-02-1 Plugging and Strengthening IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 1,747,581.00 0.00 Completed 2023-01-12 2022-10-05 2023-01-12 2022-10-07 2023-01-20 2022-10-27 or explanation) 9 of Breaches Along Indus Link Drain. Page 3 PK-POSID-336092-CW-DIR / REMODELING AND REHABILIT Other (with field f 2023-04-2 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 3,469,384.00 0.00 Signed 2023-01-13 2022-11-14 2023-01-13 2022-11-15 2023-01-21 2022-12-08 ATION OF ARAL WAH (RD 1+ or explanation) 1 250 TO RD 0+000 & RD 0+0 00 TO 14+000). PK-POSID-336095-CW-DIR / Remodeling and Rehabilitatio Other (with field f 2023-04-2 n of Danister Tail Regulator a IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 2,745,403.00 0.00 Signed 2023-01-13 2022-11-14 2023-01-13 2022-11-15 2023-01-21 2022-12-08 or explanation) 1 nd Regulator for 10 Phats (Mi nors) Danister Canal (Civil W orks). PK-POSID-343948-CW-DIR / Other (with field f 2023-05-2 Rehabilitation Of Old Water IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 173,193.00 0.00 Signed 2023-02-20 2022-12-07 2023-02-20 2022-12-09 2023-02-28 2023-01-12 or explanation) 9 Way In Desert Area Of Khairp ur. Request for Quota PK-POSID-341482-CW-RFQ / Request for Quota Single Stage - One E tions - Small Work 2023-12-1 Rehabilitation of Talpur Wad IDA / 72500 Infrastructure Rehabilitation Post Limited 530,161.00 0.00 Signed 2023-02-24 2023-02-27 2023-03-17 2023-04-07 tions nvelope s (Emergency) SP 2 a Pumping Station And Water D -Competitive Carrier Drain. PK-POSID-341480-CW-RFQ / Request for Quota Rehabilitation of Syphon at A Request for Quota Single Stage - One E tions - Small Work 2023-12-1 IDA / 72500 Infrastructure Rehabilitation Post Limited 294,021.00 0.00 Terminated 2023-02-24 2023-02-27 2023-03-17 2023-04-07 li Bahar Branch And Rehabilit tions nvelope s (Emergency) SP 2 ation of Syphon at Kubri Mino D -Competitive r. Request for Quota PK-POSID-341483-CW-RFQ / Request for Quota Single Stage - One E tions - Small Work 2023-12-1 Rehabilitation of G & F Pumpi IDA / 72500 Infrastructure Rehabilitation Post Limited 752,713.00 0.00 Signed 2023-02-24 2023-02-27 2023-03-17 2023-04-07 tions nvelope s (Emergency) SP 2 ng Station. D -Competitive Request for Quota PK-POSID-341485-CW-RFQ / Request for Quota Single Stage - One E tions - Small Work 2023-12-1 Rehabilitation of Karampur Ri IDA / 72500 Infrastructure Rehabilitation Post Limited 527,885.00 0.00 Signed 2023-02-24 2023-02-27 2023-03-17 2023-04-14 tions nvelope s (Emergency) SP 2 ng Bund. D -Competitive PK-POSID-335901-CW-DIR / Other (with field f 2023-02-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 337,811.00 0.00 Signed 2023-01-12 2022-10-05 2023-01-12 2022-10-07 2023-01-20 2022-10-27 Rehabilitation Of Mehar Main or explanation) 9 Drain. PK-POSID-348241-CW-DIR / Rehabilitation of F.P Bund (R Other (with field f 2023-12-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 4,507,304.00 0.00 Completed 2023-03-09 2022-12-07 2023-03-09 2022-12-09 2023-03-17 2023-01-12 D 0+000 to RD 20+000 & RD or explanation) 2 75+000 to RD 160+000). PK-POSID-348243-CW-DIR / Other (with field f 2023-12-1 Rehabilitation of F.P Bund (R IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 4,533,536.00 0.00 Completed 2023-03-09 2022-12-07 2023-03-09 2022-12-09 2023-03-17 2023-01-12 or explanation) 2 D 210+000 to RD 265+000). PK-POSID-348244-CW-DIR / Other (with field f 2023-12-1 Rehabilitation of F.P Bund (R IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 4,506,334.00 0.00 Signed 2023-03-09 2022-12-07 2023-03-09 2022-12-09 2023-03-17 2023-01-12 or explanation) 2 D 265+000 to RD 325+000). PK-POSID-348246-CW-DIR / Rehabilitation of Gates in Ara Other (with field f 2023-12-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 3,361,791.00 0.00 Signed 2023-03-09 2022-12-07 2023-03-09 2022-12-09 2023-03-17 2023-01-11 l Head Regulator, Dainster Ta or explanation) 2 il Regulator and 10 Phats (Mi nors) Regulators. PK-POSID-348248-CW-DIR / Rehabilitation of Retaining W Other (with field f 2023-12-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 4,976,266.00 0.00 Completed 2023-03-09 2022-12-07 2023-03-09 2022-12-09 2023-03-17 2023-01-12 all (3 RDs) along Danistar Ca or explanation) 2 nal (Bubak/Miani Town). PK-POSID-348251-CW-DIR / Other (with field f 2023-12-1 Rehabilitation of Irrigation W IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 3,348,712.00 0.00 Signed 2023-03-09 2022-12-07 2023-03-09 2022-12-09 2023-03-17 2023-01-11 or explanation) 2 orks on Johi Branch. PK-POSID-348254-CW-DIR / Remodeling of Shaheed Bena Other (with field f 2023-12-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 5,891,955.00 0.00 Completed 2023-03-09 2022-12-07 2023-03-09 2022-12-09 2023-03-17 2023-01-11 zirabad Stormwater Drain (R or explanation) 2 D 0+000 to 16+556). PK-POSID-348257-CW-DIR / Remodeling of Shaheed Bena Other (with field f 2023-12-1 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 5,558,022.00 0.00 Completed 2023-03-09 2022-12-07 2023-03-09 2022-12-09 2023-03-17 2023-01-12 zirabad Stormwater Drain (R or explanation) 2 D 13+320+ to RD 26+223). PK-POSID-356470-CW-DIR / Construction of new T-head S pur along Ruk loop bund mile 0/0+200, 04 Nos. Stone Stud Other (with field f 10,393,757.0 Under Revie 2024-01-2 s, providing stone pitching, st IDA / 72500 Infrastructure Rehabilitation Prior Direct Selection Direct - National 0.00 2023-04-14 2023-04-17 2023-04-14 2023-04-26 2023-04-27 2023-06-19 or explanation) 0 w 2 one apron along Rukh loop b und mile 0/0 to 0/5 and Ghu mra loop bund mile 4/6 & pro viding stone pitching and apr on at remaining portions. PK-POSID-356505-CW-DIR / Rehabilitation/Re-Constructio Other (with field f 2024-01-2 IDA / 72500 Infrastructure Rehabilitation Post Direct Selection Direct - National 1,957,566.00 0.00 Signed 2023-04-14 2023-04-14 2023-04-14 2023-04-14 2023-04-27 2023-04-25 n of Regulator Mile 44th of D or explanation) 2 esert Canal. Damaged during floods 2022. PK-POSID-433285-CW-RFB / Rehabilitation of Ruk Loop Bu Single Stage - One E Other (with field f Pending Imp 2024-10-2 nd (Additional Work of Bund IDA / 72500 Infrastructure Rehabilitation Post Request for Bids Limited - National 4,849,138.00 0.00 2024-06-12 2024-06-12 2024-06-24 2024-06-27 2024-07-28 nvelope or explanation) lementation 6 not carried out in Phase-I) be tween mile 0/0 to mile 0/5. PK-POSID-437485-CW-RFB / Single Stage - One E Other (with field f Pending Imp 2024-12-2 Reconstruction/ Rehabilitatio IDA / 72500 Infrastructure Rehabilitation Post Request for Bids Limited - National 895,796.00 0.00 2024-07-10 2024-07-10 2024-07-17 2024-07-22 2024-08-22 nvelope or explanation) lementation 2 n of Aqueduct at Miro Khan D rain RD 0+600. PK-POSID-437489-CW-RFB / Rehabilitation of Suprio Bund Single Stage - One E Other (with field f Pending Imp 2024-12-2 (RD 0+000 to RD 164+000). IDA / 72500 Infrastructure Rehabilitation Post Request for Bids Limited - National 1,832,555.00 0.00 2024-07-10 2024-07-10 2024-07-17 2024-07-22 2024-08-22 nvelope or explanation) lementation 2 [Most critical portions affecte d by Flood-2022]. PK-POSID-437491-CW-RFB / Restoration of Flood-2022 da Single Stage - One E Other (with field f Pending Imp 2024-12-2 mages of Main Nara Valley ( IDA / 72500 Infrastructure Rehabilitation Post Request for Bids Limited - National 1,151,599.00 0.00 2024-07-10 2024-07-10 2024-07-17 2024-07-22 2024-08-22 nvelope or explanation) lementation 2 MNV) Drain Extension from R D 0+000 to RD 132+000. PK-POSID-437493-CW-RFB / Single Stage - One E Other (with field f Pending Imp 2024-12-2 Stone pitching of Left-over p IDA / 72500 Infrastructure Rehabilitation Post Request for Bids Limited - National 2,443,406.00 0.00 2024-07-10 2024-07-10 2024-07-17 2024-07-22 2024-08-22 nvelope or explanation) lementation 2 ortions of Aral Wah (RD 0+00 0 to RD 14+000). Page 4 GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-POSID-353032-GO-RFQ / Project Management and Op Request for Quota Single Stage - One E IDA / 72500 Post Limited 107,410.00 0.00 Completed 2023-04-03 2023-04-03 2023-04-25 2023-04-19 2023-10-22 2023-06-20 Procurement of Vehicles. erational Costs tions nvelope PK-POSID-364645-GO-RFQ / Project Management and Op Request for Quota Single Stage - One E Procurement of IT Equipment IDA / 72500 Post Limited 14,000.00 0.00 Completed 2023-06-01 2023-06-02 2023-06-08 2023-06-12 2023-07-08 2023-06-15 erational Costs tions nvelope for Office use. PK-POSID-378808-GO-RFQ / Project Management and Op Request for Quota Single Stage - One E IDA / 72500 Post Open - National 98,333.00 0.00 Completed 2023-08-25 2023-08-29 2023-09-22 2023-09-15 2024-03-20 2023-12-14 Procurement of 3Nos: vehicle erational Costs tions nvelope s. PK-POSID-389120-GO-RFQ / Project Management and Op Request for Quota Single Stage - One E Procurement of Goods for Re IDA / 72500 Post Limited 34,026.00 0.00 Completed 2023-10-26 2023-10-27 2023-11-06 2023-11-16 2024-01-05 2023-12-05 erational Costs tions nvelope novation of Office Conferenc e Room. NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-POSID-364945-CS-CQS / Project Management and Op Consultant Qualifi IDA / 72500 Post Limited 75,000.00 0.00 Signed 2023-06-02 2023-06-08 2023-06-12 2023-06-23 2023-06-19 2023-07-26 2023-06-26 2023-07-31 2026-06-25 The Hiring of Internal Audit Fi erational Costs cation Selection rm. PK-POSID-364947-CS-CQS / Environmental and Social Saf Project Management and Op Consultant Qualifi eguard Management Implem IDA / 72500 Post Limited 100,000.00 0.00 Signed 2023-06-02 2023-06-08 2023-06-12 2023-07-05 2023-06-19 2023-07-25 2023-06-26 2023-07-31 2024-03-22 erational Costs cation Selection entation and Monitoring Of R ehabilitation of Dhoro Puran Works. PK-POSID-366420-CS-QCBS / Institutional Strengthening f Hiring of Consultancy Service Quality And Cost- Open - Internationa IDA / 72500 or Resilience and Technical Prior 1,200,000.00 0.00 Canceled 2023-06-12 2023-06-19 2023-08-18 2023-09-15 2023-09-29 2023-11-03 2023-12-01 2024-11-30 s for Designing Flood Detenti Based Selection l Assistance on Weirs and Flood Affected Embankments. PK-POSID-368109-CS-CQS / The Hiring of Consultancy Se Institutional Strengthening f Consultant Qualifi rvices for Remodeling and Re IDA / 72500 or Resilience and Technical Post Open - National 298,708.00 0.00 Signed 2023-06-21 2023-07-03 2023-07-06 2023-08-18 2023-08-21 2023-10-05 2023-08-28 2023-11-07 2023-09-18 2023-11-15 2024-09-16 cation Selection designing of the Irrigation an Assistance d Drainage Network Damage d During the Flood 2022. PK-POSID-369797-CS-CQS / Institutional Strengthening f Consultant Qualifi Third Party Monitoring & Vali IDA / 72500 or Resilience and Technical Post Open - National 250,000.00 0.00 Signed 2023-07-01 2023-07-17 2023-07-17 2023-07-24 2023-08-23 2023-09-11 2023-08-30 2023-09-18 2023-09-20 2023-09-25 2024-12-18 cation Selection dation Under SFERP. Assistance PK-POSID-375713-CS-CQS / Hiring of Consultancy Service s for preparation of Environm Project Management and Op Consultant Qualifi IDA / 72500 Post Open - National 200,000.00 0.00 Signed 2023-08-07 2023-08-08 2023-08-22 2023-08-28 2023-09-18 2023-10-06 2023-10-02 2023-11-09 2023-10-12 2023-11-17 2024-10-11 ent and Social management erational Costs cation Selection plans and other related docu mentation of leftover works d amaged during Floods 2022. PK-POSID-342908-CS-QCBS / Institutional Strengthening f Forensic Analysis of 2022 Flo Quality And Cost- Open - Internationa IDA / 72500 or Resilience and Technical Prior 1,500,000.00 0.00 Canceled 2023-02-16 2023-10-30 2023-02-20 2023-04-06 2023-05-11 2023-06-10 2023-06-27 2023-07-07 2024-07-06 ods and Mitigation Options o Based Selection l Assistance n the Right Bank of Indus. PK-POSID-391730-CS-QCBS / Institutional Strengthening f Flood Risk Assessment and P Quality And Cost- Open - Internationa Under Implement IDA / 72500 or Resilience and Technical Prior 3,760,000.00 0.00 2023-11-06 2023-12-03 2023-11-07 2023-12-12 2023-12-22 2024-03-15 2024-01-26 2024-04-24 2024-02-26 2024-06-13 2024-03-12 2024-04-05 2025-04-05 roposal of Mitigation Measure Based Selection l ation Assistance s for the Right Bank of Indus River. PK-POSID-401757-CS-CQS / Institutional Strengthening f Pollution Source Identificatio Consultant Qualifi Under Implement IDA / 72500 or Resilience and Technical Post Open - National 250,000.00 0.00 2024-01-11 2024-01-10 2024-01-31 2024-02-14 2024-03-18 2024-06-04 2024-03-25 2024-04-04 2025-04-04 n Study for Ecological Restor cation Selection ation Assistance ation of Manchar Lake. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-POSID-344014-CS-CDS / Institutional Strengthening f Development & Integration o Direct - Internation IDA / 72500 or Resilience and Technical Post Direct Selection 949,373.00 0.00 Signed 2023-02-20 2023-03-05 2023-03-01 2023-03-15 2023-04-04 2023-04-06 2024-04-02 f Kirthar Model and Operatio al Assistance ns & Maintenance of Data Ce nter. PK-POSID-346415-CS-INDV / Project Management and Op Individual Consult The Hiring of Project Director IDA / 72500 Post Open - National 101,533.00 0.00 Signed 2023-03-01 2023-03-17 2023-03-29 2023-06-02 2023-04-03 2023-06-02 2023-04-12 2023-06-13 2025-04-09 erational Costs ant Selection (Market Based). PK-POSID-349520-CS-INDV / Project Management and Op Individual Consult The Hiring of Gender Speciali IDA / 72500 Post Open - National 12,915.00 0.00 Terminated 2023-03-14 2022-11-20 2023-04-06 2022-12-16 2023-04-07 2022-12-26 2023-04-13 2023-04-04 2024-04-11 erational Costs ant Selection st for SFERP. PK-POSID-349526-CS-INDV / Project Management and Op Individual Consult The Hiring of Environment Co IDA / 72500 Post Open - National 12,915.00 0.00 Terminated 2023-03-14 2022-11-20 2023-04-06 2022-12-16 2023-04-07 2022-12-26 2023-04-13 2023-01-27 2024-04-11 erational Costs ant Selection nsultant for SFERP. PK-POSID-349551-CS-INDV / Project Management and Op Individual Consult The Hiring of Social Safeguar IDA / 72500 Post Open - National 12,915.00 0.00 Signed 2023-03-14 2022-11-20 2023-04-06 2022-12-16 2023-04-07 2022-12-26 2023-04-13 2023-04-03 2024-04-11 erational Costs ant Selection d Consultant for SFERP. Page 5 PK-POSID-418244-CS-CDS / Project Management and Op IDA / 72500 Post Direct Selection Direct - National 18,200.00 0.00 Signed 2024-03-22 2024-03-22 2024-04-01 2024-03-29 2024-04-25 2025-04-24 The Hiring of Gender Speciali erational Costs st. PK-POSID-430998-CS-INDV / The Hiring of Procurement an Project Management and Op Individual Consult IDA / 72500 Prior Open - National 75,404.00 0.00 Under Review 2024-05-31 2024-06-27 2024-07-01 2024-07-11 2027-12-31 d Contract Management Spe erational Costs ant Selection cialist (Individual Consultant) . PK-POSID-435547-CS-CDS / Project Management and Op Pending Impleme IDA / 72500 Post Direct Selection Direct - National 148,904.00 0.00 2024-06-25 2024-06-28 2024-07-19 2027-12-31 Senior Water Management S erational Costs ntation pecialist. PK-POSID-435550-CS-CDS / Project Management and Op Pending Impleme IDA / 72500 Post Direct Selection Direct - National 114,522.00 0.00 2024-06-25 2024-06-28 2024-07-19 2027-12-31 Finance Consultant. erational Costs ntation PK-POSID-435553-CS-CDS / Project Management and Op Pending Impleme IDA / 72500 Post Direct Selection Direct - National 38,149.00 0.00 2024-06-25 2024-06-28 2024-07-19 2027-12-31 Structural Safety Engineer. erational Costs ntation PK-POSID-435570-CS-CDS / Project Management and Op Pending Impleme IDA / 72500 Post Direct Selection Direct - National 74,944.00 0.00 2024-06-25 2024-06-28 2024-07-19 2027-12-31 Electro Hydro Consultant. erational Costs ntation PK-POSID-435572-CS-CDS / Project Management and Op Pending Impleme IDA / 72500 Post Direct Selection Direct - National 97,218.00 0.00 2024-06-25 2024-06-28 2024-07-19 2027-12-31 Water Management Specialis erational Costs ntation t. PK-POSID-435554-CS-CDS / Project Management and Op Pending Impleme IDA / 72500 Post Direct Selection Direct - National 62,023.00 0.00 2024-07-10 2024-07-26 2024-08-16 2028-01-28 Fiduciary Consultant. erational Costs ntation Page 6