PROCUREMENT PLAN (Textual Part)
Project information: Mauritania- Water and Sanitation Sectoral
Project-- P167328
Project Implementation agency: Ministry of Hydraulic and Sanitation
(MHA)
Date of the Procurement Plan: 25 December 2020
Period covered by this Procurement Plan: 28 September 2020 to 30
November 2025


Preamble

In accordance with paragraph 5.9 of the “World Bank Procurement Regulations
for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s
Systematic Tracking and Exchanges in Procurement (STEP) system will be
used to prepare, clear and update Procurement Plans and conduct all
procurement transactions for the Project.

This textual part along with the Procurement Plan tables in STEP constitute the
Procurement Plan for the Project. The following conditions apply to all
procurement activities in the Procurement Plan. The other elements of the
Procurement Plan as required under paragraph 4.4 of the Procurement
Regulations are set forth in STEP.

The Bank’s Standard Procurement Documents: shall be used for all
contracts subject to international competitive procurement and those
contracts as specified in the Procurement Plan tables in STEP.

National Procurement Arrangements: In accordance with paragraph 5.3
of the Procurement Regulations, when approaching the national market (as
specified in the Procurement Plan tables in STEP), the country’s own
procurement procedures may be used. “Not Applicable”




Leased Assets as specified under paragraph 5.10 of the Procurement
Regulations: Leasing may be used for those contracts identified in the
Procurement Plan tables. Otherwise state “Not Applicable”
Procurement of Second Hand Goods as specified under paragraph 5.11 of
the Procurement Regulations – is allowed for those contracts identified in the
Procurement Plan tables Otherwise state “Not Applicable”
Domestic preference as specified under paragraph 5.51 of the Procurement
Regulations (Goods and Works). Specify for each
Goods:
“Not Applicable”


Works: “Not Applicable”


Hands-on Expanded Implementation Support (HEIS) as specified under
paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. “Not
Applicable”


Other Relevant Procurement Information.
“Not Applicable”
PROCUREMENT
                Mauritania : Water and Sanitation Sectoral Project
PLAN
General Information
Country:           Mauritania                                                                              2021-01-13
                                                      Bank’s Approval Date of the Original Procurement Plan:
                                                                                                           2024-06-19
                                                      Revised Plan Date(s): (comma delineated, leave blank if none)
Project ID:        P167328                            GPN Date:                                            2020-12-21
Project Name:      Water and Sanitation Sectoral Project
Loan / Credit No:  IDA / D5710
                   WATER AND SANITATION SECTORAL PROJECT
Executing Agency(ies):

WORKS
Activity Reference No. /                                                                                                                                                         Procureme Actual Am                                                                                                                                                           Bid Evaluation Report
                                Loan / Credit N                                                                   Market Approac Procurement Pro Prequalification High SEA/SH Ri                     Process St Draft Pre-qualification Prequalification Evalu   Draft Bidding Docum Specific Procurement            Bidding Documents a Proposal Submission /                                                          Contract Complet
       Description                                       Component                 Review Type       Method                                                                      nt Docume ount (US$                                                                                                                                                           and Recommendation               Signed Contract
                                       o.                                                                                h             cess           (Y/N)             sk                              atus         Documents               ation Report         ent / Justification Notice / Invitation                  s Issued        Opening / Minutes                                                                   ion
                                                                                                                                                                                   nt Type     )                                                                                                                                                                     for Award
                                                                                                                                                                                                                 Planned     Actual      Planned      Actual     Planned       Actual      Planned       Actual       Planned     Actual  Planned     Actual    Planned     Actual            Planned       Actual      Planned     Actual

                                                  Component 1: Improvement
 02/T/PSEA/2022 / Réhabiliter
                                                  of access to drinking water a                                   Open - Internationa Single Stage - One E                                                                                                                                                                                                                                                              2023-02-2
et étendre le réseau AEP de   IDA / D5710                                       A posteriori     Appel d'offres                                                                                     0.00   Signé                                                 2022-05-10   2023-05-29   2022-05-15   2023-05-29                        2022-06-26   2023-07-12   2022-07-26   2023-07-11   2022-08-30
                                                  nd sanitation in Gorgol, Guid                                   l                   nvelope                                                                                                                                                                                                                                                                               6
Kiffa
                                                  imakha and Assaba

                                                                                                                                                                                  Document na
 O1/T/PSEA/2022 / Réhabilite                                                                                                                                                      tional de pas
r et étendre 62 systèmes de                       Component 1: Improvement                                                                                                        sation des m
distribution d’eau potable exi                    of access to drinking water a                                   Open - Internationa Single Stage - One E                        archés - Proc            En attente d                                                                                                                                                                                                 2023-03-0
                                IDA / D5710                                     A posteriori     Appel d'offres                                                                                     0.00                                                         2022-05-17                2022-05-22                                     2022-07-03                2022-08-02                2022-09-06
stants dans les localités rural                   nd sanitation in Gorgol, Guid                                   l                   nvelope                                     essus à une              'exécution                                                                                                                                                                                                       5
es sélectionnées (Assaba - G                      imakha and Assaba                                                                                                               enveloppe (D
orgol - Guidimakha )                                                                                                                                                              TPM ne prov
                                                                                                                                                                                  enant pas de
                                                                                                                                                                                  la Banque) na
                                                                                                                                                                                  Document
 03/T/PSEA/2021 / Réhabiliter
                                                                                                                                                                                  tional de pas
et étendre les réseaux AEP d
                                                  Component 1: Improvement                                                                                                        sation des m
e 5 localités semi-urbaines (
                                                  of access to drinking water a                                                       Single Stage - One E                        archés - Proc            En attente d                                                                                                                                                                                                 2023-05-0
Monguel et Maghama - Gorg IDA / D5710                                           A posteriori     Appel d'offres   Open - National                                                                   0.00                                                         2022-07-13                2022-07-26                                     2022-09-06                2022-10-06                2022-11-10
                                                  nd sanitation in Gorgol, Guid                                                       nvelope                                     essus à une              'exécution                                                                                                                                                                                                       9
ol ; Ould Yenjé - Guidimakha
                                                  imakha and Assaba                                                                                                               enveloppe (D
; Boumdeid et Barkeol - Assa
                                                                                                                                                                                  TPM ne prov
ba)
                                                                                                                                                                                  enant pas de
                                                                                                                                                                                  la Banque) na
                                                                                                                                                                                  Document
                                                  Component 2: Improving sus                                                                                                      tional de pas
                                                  tainable access to safe wate                                                                                                    sation des m
 04/T/PSEA/2021 / Réhabiliter
                                                  r and sanitation for refugees                                                       Single Stage - One E                        archés - Proc            En attente d                                                                                                                                                                                                 2023-04-0
et étendre le réseau AEP des IDA / D5710                                        A posteriori     Appel d'offres   Open - National                                                                   0.00                                                         2022-06-15                2022-06-20                                     2022-08-01                2022-08-31                2022-10-05
                                                  and host communities in Ho                                                          nvelope                                     essus à une              'exécution                                                                                                                                                                                                       3
servant le Camp de M'Bera
                                                  dh Echargui and Hodh El Gh                                                                                                      enveloppe (D
                                                  arbi                                                                                                                            TPM ne prov
                                                                                                                                                                                  enant pas de
                                                                                                                                                                                  la Banque) na
                                                                                                                                                                                  Document
 05/T/PSEA/2021 / Réhabilitat
                                                  Component 2: Improving sus                                                                                                      tional de pas
ion et étendre 20 systèmes
                                                  tainable access to safe wate                                                                                                    sation des m
de distribution d’eau potable
                                                  r and sanitation for refugees                                                       Single Stage - One E                        archés - Proc            En attente d                                                                                                                                                                                                 2023-07-0
existants dans les localités ru IDA / D5710                                     A posteriori     Appel d'offres   Open - National                                                                   0.00                                                         2022-08-24                2022-09-14                                     2022-10-26                2022-11-25                2023-01-06
                                                  and host communities in Ho                                                          nvelope                                     essus à une              'exécution                                                                                                                                                                                                       5
rales sélectionnées (dans le
                                                  dh Echargui and Hodh El Gh                                                                                                      enveloppe (D
Hodh Echargui et dans le Ho
                                                  arbi                                                                                                                            TPM ne prov
dh El Gharbi)
                                                                                                                                                                                  enant pas de
                                                                                                                                                                                  la Banque) na
                                                                                                                                                                                  Document
                                                  Component 2: Improving sus                                                                                                      tional de pas
                                                  tainable access to safe wate                                                                                                    sation des m
 06/T/PSEA/2021 / Réhabiliter
                                                  r and sanitation for refugees                                                       Single Stage - One E                        archés - Proc            En attente d                                                                                                                                                                                                 2023-06-2
et étendre les réseaux AEP d IDA / D5710                                        A posteriori     Appel d'offres   Open - National                                                                   0.00                                                         2022-08-23                2022-09-13                                     2022-10-25                2022-11-24                2022-12-29
                                                  and host communities in Ho                                                          nvelope                                     essus à une              'exécution                                                                                                                                                                                                       7
e Oualata et de Tamchekett
                                                  dh Echargui and Hodh El Gh                                                                                                      enveloppe (D
                                                  arbi                                                                                                                            TPM ne prov
                                                                                                                                                                                  enant pas de
                                                                                                                                                                                  la Banque) na
                                                                                                                                                                                  Document
                                                  Component 2: Improving sus                                                                                                      tional de pas
 07/T/PSEA/2021 / Réaliser 2                      tainable access to safe wate                                                                                                    sation des m
400 latrines dotées de dispos                     r and sanitation for refugees                                                       Single Stage - One E                        archés - Proc            En attente d                                                                                                                                                                                                 2023-05-0
                              IDA / D5710                                       A posteriori     Appel d'offres   Open - National                                                                   0.00                                                         2022-07-19                2022-07-24                                     2022-09-04                2022-10-04                2022-11-08
itifs de lavage des mains dan                     and host communities in Ho                                                          nvelope                                     essus à une              'exécution                                                                                                                                                                                                       7
s le Camp de M'Bera                               dh Echargui and Hodh El Gh                                                                                                      enveloppe (D
                                                  arbi                                                                                                                            TPM ne prov
                                                                                                                                                                                  enant pas de
                                                                                                                                                                                  la Banque) na
                                                                                                                                                                                  Document
                                                  Component 2: Improving sus                                                                                                      tional de pas
 08/T/PSEA/2021 / Réaliser u                      tainable access to safe wate                                                                                                    sation des m
n dispositif d'évacuation des                     r and sanitation for refugees                                                       Single Stage - One E                        archés - Proc            En attente d                                                                                                                                                                                                 2023-12-3
                                IDA / D5710                                     A posteriori     Appel d'offres   Open - National                                                                   0.00                                                         2023-03-14                2023-03-19                                     2023-04-30                2023-05-30                2023-07-04
eaux pluviales dans le camp                       and host communities in Ho                                                          nvelope                                     essus à une              'exécution                                                                                                                                                                                                       1
de M'Bera                                         dh Echargui and Hodh El Gh                                                                                                      enveloppe (D
                                                  arbi                                                                                                                            TPM ne prov
                                                                                                                                                                                  enant pas de
                                                                                                                                                                                  la Banque) na
                                                                                                                                                                                  Document
                                                  Component 2: Improving sus                                                                                                      tional de pas
 11/T/PSEA/2022 / Réalisation                     tainable access to safe wate                                                                                                    sation des m
de 20 nouveaux forages et s                       r and sanitation for refugees                                                       Single Stage - One E                        archés - Proc            En attente d                                                                                                                                                                                                 2023-07-0
                              IDA / D5710                                       A posteriori     Appel d'offres   Open - National                                                                   0.00                                                         2022-09-08                2022-09-22                                     2022-11-03                2022-12-03                2023-01-07
oufflage er essais de pompag                      and host communities in Ho                                                          nvelope                                     essus à une              'exécution                                                                                                                                                                                                       6
es de 10 forages existants                        dh Echargui and Hodh El Gh                                                                                                      enveloppe (D
                                                  arbi                                                                                                                            TPM ne prov
                                                                                                                                                                                  enant pas de
                                                                                                                                                                                  la Banque) na
                                                                                                                                                                                  Document
                                                                                                                                                                                  tional de pas
 09/T/PSEA/2021 / Réaliser 8                      Component 1: Improvement                                                                                                        sation des m
05 latrines dans les écoles, le                   of access to drinking water a                                                       Single Stage - One E                        archés - Proc                                                                                                                                                                                                                         2022-12-3
                                IDA / D5710                                     A posteriori     Appel d'offres   Open - National                                                                   0.00   Signé                                                 2022-03-14   2022-10-27   2022-03-19                                     2022-04-30   2022-09-27   2022-05-30   2023-04-26   2022-07-04   2023-05-25
s centres de santé, ect,( repa                    nd sanitation in Gorgol, Guid                                                       nvelope                                     essus à une                                                                                                                                                                                                                               1
rtis en 3 lot)                                    imakha and Assaba                                                                                                               enveloppe (D
                                                                                                                                                                                  TPM ne prov
                                                                                                                                                                                  enant pas de
                                                                                                                                                                                  la Banque) na
                                                                                                                                                                                  Document
                                                                                                                                                                                  tional de pas
                                                  Component 1: Improvement                                                                                                        sation des m
 10/T/PSEA/2022 / Réalisation
                                                  of access to drinking water a                                                       Single Stage - One E                        archés - Proc                                                                                                                                                                                                                         2024-01-2
de 96 nouveaux forages (rep IDA / D5710                                         A posteriori     Appel d'offres   Open - National                                                                   0.00   Signé                                                 2022-09-07   2022-09-05   2022-09-21                                     2022-11-02   2022-10-26   2022-12-02   2022-12-20   2023-01-19   2023-06-23
                                                  nd sanitation in Gorgol, Guid                                                       nvelope                                     essus à une                                                                                                                                                                                                                               5
artis en 3 lot)
                                                  imakha and Assaba                                                                                                               enveloppe (D
                                                                                                                                                                                  TPM ne prov
                                                                                                                                                                                  enant pas de
                                                                                                                                                                                  la Banque)
                                                                                                                                                                                  Demande d'o
 MR-WSSP-332245-CW-DIR /                          Component 2: Improving sus
                                                                                                                                                                                  ffres - DTPM
Réalisation de 40 forages d'e                     tainable access to safe wate
                                                                                                                                      Single Stage - One E                        Equipements                                                                                                                                                                                                                           2024-01-0
xploitation en deux lots 1 et   IDA / D5710       r and sanitation for refugees A priori         Appel d'offres   Open - National                                  Yes                              0.00   Signé                                                 2023-03-20   2023-04-10   2023-03-25   2023-05-31                        2023-05-06   2023-03-08   2023-06-05   2023-06-05   2023-07-10   2023-06-26
                                                                                                                                      nvelope                                     Conception (                                                                                                                                                                                                                              6
2 séparés par appel d'offres                      and host communities in Ho
                                                                                                                                                                                  sans préquali
ouvert                                            dh Echargui and Hodh El Gh
                                                                                                                                                                                  fication)
                                                  arbi

                                                  Component 2: Improving sus                                                                                                      Demande d'o
 MR-WSSP-332620-CW-RFB /
                                                  tainable access to safe wate                                                                                                    ffres - DTPM
Réalisation de 40 forages d'e                                                                                                         Single Stage - One E                                                 En cours d'e                                                                                                                                                                                                 2023-12-0
                                IDA / D5710       r and sanitation for refugees A priori         Appel d'offres   Open - National                                  Yes            Travaux (san      0.00                                                         2023-02-13   2023-06-27   2023-02-18   2023-06-30                        2023-04-01   2023-08-03   2023-05-01   2023-10-30   2023-06-05
xploitation dans les Hodhs El                                                                                                         nvelope                                                              xécution                                                                                                                                                                                                         2
                                                  and host communities in Ho                                                                                                      s préqualifica
Chargui et El Gharbi (lot2)
                                                  dh Echargui and Hodh El Gh                                                                                                      tion)
                                                  arbi
                                                                                                                                                                                  Document na
                                                  Component 2: Improving sus                                                                                                      tional de pas
 MR-WSSP-336655-CW-RFB /                          tainable access to safe wate                                                                                                    sation des m
Réalisation de 161 blocs de l                     r and sanitation for refugees                                                       Single Stage - One E                        archés - Proc                                                                                                                                                                                                                         2023-12-0
                              IDA / D5710                                       A posteriori     Appel d'offres   Open - National                                                                   0.00   Signé                                                 2023-02-15   2023-01-30   2023-02-20   2023-02-06                        2023-04-03   2023-03-08   2023-05-03   2023-04-26   2023-06-07   2023-06-03
atrines publiques dans 97 loc                     and host communities in Ho                                                          nvelope                                     essus à une                                                                                                                                                                                                                               4
alités                                            dh Echargui and Hodh El Gh                                                                                                      enveloppe (D
                                                  arbi                                                                                                                            TPM ne prov
                                                                                                                                                                                  enant pas de
                                                                                                                                                                                  la Banque)




                                                                                                                                                                                                                   Page 1
                                                                                                                                                                                    Demande d'o
 MR-WSSP-335958-CW-RFB /                          Component 2: Improving sus
                                                                                                                                                                                    ffres - DTPM
Réalisation de 80 forages d'e                     tainable access to safe wate
                                                                                                                                         Single Stage - One E                       Petits travau                                                                                                                                                                                                                             2025-02-2
xploitation en deux tranches IDA / D5710          r and sanitation for refugees A posteriori     Appel d'offres     Open - National                                                                      0.00   Annulé            2023-02-01            2023-04-19                2023-04-19                2023-02-06                                 2023-06-28             2023-07-28                2023-09-01
                                                                                                                                         nvelope                                    x - (Processu                                                                                                                                                                                                                                 2
de 2 tranches de 2 lots chacu                     and host communities in Ho
                                                                                                                                                                                    s à 1 envelop
n                                                 dh Echargui and Hodh El Gh
                                                                                                                                                                                    pe)
                                                  arbi

                                                  Component 2: Improving sus                                                                                                        Demande d'o
 MR-WSSP-332248-NC-DIR / R
                                                  tainable access to safe wate                                                                                                      ffres - DTPM
éalisation de 161 blocs de lat                                                                                                           Single Stage - One E                                                                                                                                                                                                                                                                 2023-11-2
                               IDA / D5710        r and sanitation for refugees A priori         Appel d'offres     Open - National                                Yes              Travaux (san         0.00   Annulé                                                            2023-02-07   2023-04-10   2023-02-12                                 2023-03-26             2023-04-25                2023-05-30
rines publics dans 97 localité                                                                                                           nvelope                                                                                                                                                                                                                                                                                  6
                                                  and host communities in Ho                                                                                                        s préqualifica
s
                                                  dh Echargui and Hodh El Gh                                                                                                        tion)
                                                  arbi

 MR-WSSP-394979-CW-RFB /
Réhabilitation et étendre en                                                                                                                                                        Demande d'o
                                                  Component 1: Improvement
01 tranchede 30 systèmes d                                                                                                                                                          ffres - DTPM
                                                  of access to drinking water a                                                          Single Stage - One E                                                   En attente d                                                                                                                                                                                                  2024-11-0
e distribution d’eau potable e IDA / D5710                                      A posteriori     Appel d'offres     Open - National                                                 Travaux (san         0.00                                                                     2024-01-22                2024-01-27                                 2024-03-09             2024-04-08                2024-05-13
                                                  nd sanitation in Gorgol, Guid                                                          nvelope                                                                'exécution                                                                                                                                                                                                        9
xistants dans les localités rur                                                                                                                                                     s préqualifica
                                                  imakha and Assaba
ales sélectionnées (dans le H                                                                                                                                                       tion)
odhEchargui et dans le Hodh
El Gharbi)
                                                                                                                                                                                    Demande de
                                                  Component 2: Improving sus
 MR-WSSP-394976-CW-RFQ /                                                                                                                                                            cotations - D
                                                  tainable access to safe wate
Réaliser un dispositif d'évacu                                                                                                           Single Stage - One E                       TPM Petits tr               En attente d                                                                                                                                                                                                  2024-07-1
                               IDA / D5710        r and sanitation for refugees A posteriori     Demande de prix    Limited                                                                              0.00                                                                                               2024-01-20                                                                                  2024-03-16
ation des boues de vidange d                                                                                                             nvelope                                    avaux (urgen                'exécution                                                                                                                                                                                                        4
                                                  and host communities in Ho
ans le camp de M'Bera                                                                                                                                                               ce) - Avec co
                                                  dh Echargui and Hodh El Gh
                                                                                                                                                                                    mpétition
                                                  arbi

 MR-WSSP-397109-CW-RFB /
                                                                                                                                                                                    Demande d'o
Réhabiliter et étendre 80 sys                     Component 1: Improvement
                                                                                                                                                                                    ffres - DTPM
tèmes de distribution d’eau p                     of access to drinking water a                                                          Single Stage - One E                                                   En attente d                                                                                                                                                                                                  2024-10-0
                                IDA / D5710                                     A posteriori     Appel d'offres     Open - National                                                 Travaux (san         0.00                                                                     2023-12-15                2023-12-20                                 2024-01-31             2024-03-01                2024-04-05
otable existants plusieurs lot                    nd sanitation in Gorgol, Guid                                                          nvelope                                                                'exécution                                                                                                                                                                                                        2
                                                                                                                                                                                    s préqualifica
s dans les localités rurales sé                   imakha and Assaba
                                                                                                                                                                                    tion)
lectionnées (Assaba - Gorgol
- Guidimakha )
                                                                                                                                                                                    Demande d'o
 MR-WSSP-432844-CW-RFB /                          Component 1: Improvement
                                                                                                                                                                                    ffres - DTPM
Travaux de réalisation de 14                      of access to drinking water a                                                          Single Stage - One E                                                   En attente d                                                                                                                                                                                                  2025-08-1
                                IDA / D5710                                     A posteriori     Appel d'offres     Open - National                                                 Travaux (san         0.00                                                                     2024-08-18                2024-08-23                                 2024-10-04             2024-11-03                2024-12-08
nouveaux réseaux d’AEP au                         nd sanitation in Gorgol, Guid                                                          nvelope                                                                'exécution                                                                                                                                                                                                        5
                                                                                                                                                                                    s préqualifica
Gorgol                                            imakha and Assaba
                                                                                                                                                                                    tion)

 MR-WSSP-432847-CW-RFB /                                                                                                                                                            Demande d'o
                                                  Component 1: Improvement
Travaux de réalisation de 40                                                                                                                                                        ffres - DTPM
                                                  of access to drinking water a                                                          Single Stage - One E                                                   En attente d                                                                                                                                                                                                  2025-11-2
nouveaux réseaux d’AEP en      IDA / D5710                                      A posteriori     Appel d'offres     Open - National                                                 Travaux (san         0.00                                                                     2024-08-05                2024-08-10                                 2024-09-21             2024-10-21                2024-11-25
                                                  nd sanitation in Gorgol, Guid                                                          nvelope                                                                'exécution                                                                                                                                                                                                        5
deux lots distincts de 20 rése                                                                                                                                                      s préqualifica
                                                  imakha and Assaba
aux AEP chacun en Assaba et                                                                                                                                                         tion)
au Guidimaka

                                                  Component 2: Improving sus                                                                                                        Demande d'o
 MR-WSSP-432970-CW-RFB /
                                                  tainable access to safe wate                                                                                                      ffres - DTPM
Travaux de réalisation de 14                                                                                                             Single Stage - One E                                                   En attente d                                                                                                                                                                                                  2025-06-1
                             IDA / D5710          r and sanitation for refugees A posteriori     Appel d'offres     Open - National                                                 Travaux (san         0.00                                                                     2024-08-28                2024-09-02                                 2024-10-14             2024-11-13                2024-12-18
nouveaux réseaux d’AEP dan                                                                                                               nvelope                                                                'exécution                                                                                                                                                                                                        6
                                                  and host communities in Ho                                                                                                        s préqualifica
s les deux Hodhs
                                                  dh Echargui and Hodh El Gh                                                                                                        tion)
                                                  arbi
                                                                                                                                                                                    Demande de
 MR-WSSP-431943-CW-DIR /                                                                                                                                                            cotations - D
                                                  Component 3: Institutional S
Travaux de réalisation de hui                                                                    Passation de marc                                                                  TPM Petits tr               En attente d                                                                                                                                                                                                  2024-11-0
                              IDA / D5710         upport, Capacity Building an A posteriori                        Direct - National                                                                     0.00                                                                     2024-06-27                2024-07-02                                                                                  2024-08-06
t (08) nouveaux piézomètres                                                                      hé de gré à gré                                                                    avaux (urgen                'exécution                                                                                                                                                                                                        4
                                                  d Project Management
pour le suivi de la nappe du                                                                                                                                                        ce) - Sans co
Dhar                                                                                                                                                                                mpétition



GOODS
Activity Reference No. /                                                                                                                                                                                                                                                                                                                              Bid Evaluation Report
                                Loan / Credit N                                                                     Market Approac Procurement Pro Prequalification Actual Amount   Process St Draft Pre-qualification Prequalification Evalu           Draft Bidding Docum Specific Procurement            Bidding Documents a Proposal Submission /
       Description                                       Component                 Review Type       Method                                                                                                                                                                                                                                           and Recommendation        Signed Contract         Contract Completion
                                       o.                                                                                  h             cess           (Y/N)           (US$)          atus         Documents              ation Report                  ent / Justification Notice / Invitation                  s Issued        Opening / Minutes
                                                                                                                                                                                                                                                                                                                                                            for Award
                                                                                                                                                                                                     Planned      Actual          Planned      Actual   Planned       Actual      Planned       Actual       Planned     Actual  Planned     Actual    Planned     Actual     Planned       Actual      Planned      Actual

 01/F/PSEA/2021 / Acquisition                     Component 3: Institutional S
                                                                                                                                         Single Stage - One E
de matériel informatique et   IDA / D5710         upport, Capacity Building an A posteriori      Demande de prix    Open - National                                          0.00   Signé                                                                                         2021-01-17                                                                                  2021-03-14   2020-04-20   2021-09-10
                                                                                                                                         nvelope
matériel bureautique                              d Project Management


                                                  Component 3: Institutional S
02/F/PSEA/2021 / Logiciel TE                                                                     Passation de marc
                                IDA / D5710       upport, Capacity Building an A posteriori                        Direct                                                    0.00   Signé                                                               2021-03-10   2021-05-05   2021-03-15   2021-05-05                                                                     2021-04-19   2021-05-05   2021-10-16
MPRO                                                                                             hé de gré à gré
                                                  d Project Management


 03/F/PSEA/2021 / Acquisition                     Component 3: Institutional S                   Passation de marc
                                                                                                                                                                                    En cours d'ex
7 Véhicules(3 SW+4 PU) pour IDA / D5710           upport, Capacity Building an A posteriori      hés auprès des ag Direct                                                    0.00                                                                       2021-04-12   2021-03-22   2021-04-17   2021-03-22                                                                     2021-05-22                2021-11-18
                                                                                                                                                                                    écution
l'UCP                                             d Project Management                           ences de l'ONU


 03/F/PSEA/2022 / Acquisition
                                                  Component 3: Institutional S
6 véhicules (2 SW +4 PU) po                                                                      Passation de marc
                              IDA / D5710         upport, Capacity Building an A posteriori                        Direct                                                    0.00   Annulé                                                              2022-05-19                2022-05-24                                                                                  2022-07-12                2023-01-08
ur MHA dont deux véhicules                                                                       hé de gré à gré
                                                  d Project Management
au profit du CNRE


 MR-WSSP-376063-GO-RFQ /
                                                  Component 3: Institutional S
Acquisition de logiciels en ge                                                                                                           Single Stage - One E                       En attente d'
                               IDA / D5710        upport, Capacity Building an A posteriori      Demande de prix    Limited                                                  0.00                                                                                                 2023-10-07                                                                                  2023-12-02                2024-01-31
stion de l’assainissement non                                                                                                            nvelope                                    exécution
                                                  d Project Management
collectif au profit de la DA


 MR-WSSP-376065-GO-RFQ /
Fourniture de logiciel de sim                     Component 3: Institutional S
                                                                                                                                         Single Stage - One E                       En attente d'
ulation hydrauliquse GISet d IDA / D5710          upport, Capacity Building an A posteriori      Demande de prix    Limited                                                  0.00                                                                                                 2024-02-18                                                                                  2024-04-14                2024-06-13
                                                                                                                                         nvelope                                    exécution
e logiciel de simulation ARC                      d Project Management
GIS/Water cad/Hammer/Cebe
mail pour SNDE

 MR-WSSP-394995-GO-RFB /
                                                  Component 3: Institutional S
Acquisition de deux véhicule                                                                                                             Single Stage - One E                       En attente d'
                                IDA / D5710       upport, Capacity Building an A posteriori      Appel d'offres     Open - National                                          0.00                                                                       2024-02-20                2024-02-25                                     2024-04-07            2024-05-07             2024-06-11                2024-09-09
s :1 Station Wagon et 1 Pick                                                                                                             nvelope                                    exécution
                                                  d Project Management
up au profit du CNRE


 02/F/PSEA/2022 / Acquisition                     Component 3: Institutional S
                                                                                                                                         Single Stage - One E                       En attente d'
d'unités de prospection géo IDA / D5710           upport, Capacity Building an A posteriori      Appel d'offres     Open - National                                          0.00                                                                       2022-06-14                2022-06-19                                     2022-07-31            2022-08-30             2022-10-04                2023-01-10
                                                                                                                                         nvelope                                    exécution
physique et équipement au p                       d Project Management
rofit au CNRE

 01/F/PSEA/2022 / Equipeme                        Component 2: Improving sus
nt réseau piézométriques tél                      tainable access to safe wate
                                                                                                                                         Single Stage - One E                       En attente d'
émétrique des nappes de Dh      IDA / D5710       r and sanitation for refugees A posteriori     Appel d'offres     Open - National                                          0.00                                                                       2024-02-15                2024-02-27                                     2024-04-09            2024-05-09             2024-06-13                2024-08-22
                                                                                                                                         nvelope                                    exécution
ar et du Grés d'Aïoun (25) au                     and host communities in Ho
profit du CNRE                                    dh Echargui and Hodh El Gh
                                                  arbi

 MR-WSSP-431947-GO-RFQ /
                                                  Component 3: Institutional S
Fourniture et Installation de                                                                                                            Single Stage - One E                       En attente d'
                               IDA / D5710        upport, Capacity Building an A posteriori      Demande de prix    Open - National                                          0.00                                                                                                 2024-07-20                                                                                  2024-09-14                2024-11-13
10 enregistreurs pour le suivi                                                                                                           nvelope                                    exécution
                                                  d Project Management
de la nappe du Dhar et réhab
ilitation des tètes

 MR-WSSP-432833-GO-RFQ /                          Component 3: Institutional S
                                                                                                                                         Single Stage - One E                       En attente d'
Acquisition de logiciels ARC    IDA / D5710       upport, Capacity Building an A posteriori      Demande de prix    Limited - National                                       0.00                                                                                                 2024-07-19                                                                                  2024-09-13                2024-11-12
                                                                                                                                         nvelope                                    exécution
GIS et MOD FLOW au profit d                       d Project Management
u CNRE




                                                                                                                                                                                                                         Page 2
MR-WSSP-432829-GO-DIR /                           Component 3: Institutional S
                                                                                                 Passation de marc                                                                                    En attente d'
Acquisition de 05 véhicules     IDA / D5710       upport, Capacity Building an A posteriori                        Direct - National                                                          0.00                                                                          2024-06-13             2024-06-18                                                                                              2024-07-23                2025-01-19
                                                                                                 hé de gré à gré                                                                                      exécution
4X4 au profit de l’UCP                            d Project Management



NON CONSULTING SERVICES
Activity Reference No. /                                                                                                                                                                                                                                                                                                                                               Bid Evaluation Report
                                Loan / Credit N                                                                      Market Approac Procurement Pro Prequalification Actual Amount                    Process St Draft Pre-qualification Prequalification Evalu             Draft Bidding Docum Specific Procurement         Bidding Documents a Proposal Submission /
       Description                                       Component                 Review Type       Method                                                                                                                                                                                                                                                            and Recommendation                    Signed Contract         Contract Completion
                                       o.                                                                                   h             cess           (Y/N)           (US$)                           atus         Documents              ation Report                    ent / Justification Notice / Invitation               s Issued        Opening / Minutes
                                                                                                                                                                                                                                                                                                                                                                             for Award
                                                                                                                                                                                                                      Planned       Actual        Planned       Actual      Planned      Actual    Planned       Actual       Planned     Actual  Planned     Actual    Planned     Actual                 Planned       Actual      Planned      Actual
 MR-WSSP-394994-NC-RFQ /                          Component 1: Improvement
soufflage et essais de pompa                      of access to drinking water a                                                            Single Stage - One E                                       En attente d'
                               IDA / D5710                                      A posteriori     Demande de prix     Limited                                                                  0.00                                                                                                 2024-03-16                                                                                              2024-05-11                2024-07-10
ges de 10 forages existants d                     nd sanitation in Gorgol, Guid                                                            nvelope                                                    exécution
ans le cadre des réhabilitatio                    imakha and Assaba
ns AEP (lot 1 et lot 2)


CONSULTING FIRMS
Activity Reference No. /                                                                                                                                                                                                                                                                                                                                        Combined Evaluation
                                Loan / Credit N                                                                      Market Approac         Contract Type         Actual Amount                                                    Expression of Interest Short List and Draft R Request for Proposals Opening of Technical               Evaluation of Technic
       Description                                       Component                 Review Type        Method                                                                      Process Status       Terms of Reference                                                                                                                                       Report and Draft Neg            Signed Contract         Contract Completion
                                       o.                                                                                   h                                         (US$)                                                               Notice          equest for Proposals        as Issued         Proposals / Minutes                    al Proposal
                                                                                                                                                                                                                                                                                                                                                                   otiated Contract
                                                                                                                                                                                                       Planned         Actual       Planned        Actual      Planned       Actual      Planned    Actual      Planned       Actual      Planned      Actual    Planned     Actual           Planned       Actual      Planned       Actual
                                                  Component 3: Institutional S
 07/PI/PSEA/2021 / Recrutem                                                                      Sélection au moin                                                                En cours d'exécut
                                IDA / D5710       upport, Capacity Building an A posteriori                          Open - National                                       0.00                       2021-06-15      2021-03-19   2021-07-06                  2021-08-19                                       2021-09-16                2021-10-16                2021-11-20                2021-12-25                2022-06-23
ent Auditeur Externe                                                                             dre coût                                                                         ion
                                                  d Project Management


                                                  Component 1: Improvement
                                                                                                 Sélection fondée s
 15/PI/PSEA/2021 / Recrutem                       of access to drinking water a                                      Open - Internationa
                                IDA / D5710                                     A posteriori     ur la qualité et le                                                       0.00   Signé               2021-02-15      2021-02-11   2021-03-08     2021-02-16   2021-04-21   2021-07-12                          2021-05-19   2021-09-30   2021-06-18   2021-11-05   2021-07-23   2021-12-06   2021-08-27   2022-06-09   2022-08-27
ent Maître d'Œuvre (MOE)                          nd sanitation in Gorgol, Guid                                      l
                                                                                                 coût
                                                  imakha and Assaba


 16/PI/PSEA/2021 / Recrutem                       Component 3: Institutional S                   Sélection fondée s
                                                                                                                     Open - Internationa
ent Assistance Technique UC     IDA / D5710       upport, Capacity Building an A posteriori      ur la qualité et le                                                       0.00   Annulé              2021-02-23      2021-02-18   2021-03-16                  2021-04-29                                       2021-05-27                2021-06-26                2021-07-31                2021-09-04                2022-09-04
                                                                                                                     l
P/Agences d'Exécution                             d Project Management                           coût


                                                  Component 1: Improvement
 16/S/PSEA/2021 / Recruteme                                                                      Sélection fondée s
                                                  of access to drinking water a                                      Open - Internationa
nt Assistance Technique UCP IDA / D5710                                         A posteriori     ur la qualité et le                                                       0.00   Signé               2021-02-26      2021-02-24   2021-03-19     2021-03-24   2021-05-02   2021-06-30                          2021-05-30   2021-10-29   2021-06-29   2021-10-29   2021-08-03   2022-02-09   2021-09-07   2022-03-17   2022-09-07
                                                  nd sanitation in Gorgol, Guid                                      l
/Agences d'Exécution                                                                             coût
                                                  imakha and Assaba


 21/PI/PSEA/2022 / Recrutem                       Component 1: Improvement
                                                                                                 Sélection fondée s
ent de trois ONG chargées de                      of access to drinking water a                                                                                                   En cours d'exécut
                             IDA / D5710                                        A posteriori     ur les qualification Open - National                                      0.00                       2022-05-25      2023-06-27   2022-06-15                  2022-07-29                                                                                           2022-08-28                2022-10-02                2023-03-31
mener les campagnes de sen                        nd sanitation in Gorgol, Guid                                                                                                   ion
                                                                                                 s des consultants
sibilisation                                      imakha and Assaba


                                                  Component 2: Improving sus
 22/PI/PSEA/2022 / Recrutem
                                                  tainable access to safe wate                   Sélection fondée s
ent de deux ONG chargées d                                                                                                                                                        En cours d'exame
                            IDA / D5710           r and sanitation for refugees A posteriori     ur les qualification Open - National                                      0.00                       2022-09-14      2023-02-17   2022-10-05                  2022-11-18                                                                                           2022-12-18                2023-01-22                2023-07-21
e mener les campagnes de s                                                                                                                                                        n
                                                  and host communities in Ho                     s des consultants
ensibilisation
                                                  dh Echargui and Hodh El Gh
                                                  arbi

 17/PI/PSEA/2021 / Recruter l                     Component 1: Improvement
                                                                                                 Sélection fondée s
es ONG et mener les campag                        of access to drinking water a
                              IDA / D5710                                       A priori         ur les qualification Open - National                                      0.00   Annulé              2022-06-07                   2022-06-28                  2022-08-11                                                                                           2022-09-10                2022-10-15                2023-04-13
nes de sensibilisation (compo                     nd sanitation in Gorgol, Guid
                                                                                                 s des consultants
sante 1.2 et 2.2)                                 imakha and Assaba


                                                  Component 2: Improving sus
 01/PI/PSEA/2022 / Elaborer l
                                                  tainable access to safe wate                   Sélection fondée s
es études pour l'assainissem                                                                                                                                                      En attente d'exéc
                              IDA / D5710         r and sanitation for refugees A posteriori     ur les qualification Open - National                                      0.00                       2022-08-10                   2022-08-31                  2022-10-14                                                                                           2022-11-13                2022-12-18                2023-06-16
ent pluvial du camp de Mberr                                                                                                                                                      ution
                                                  and host communities in Ho                     s des consultants
é
                                                  dh Echargui and Hodh El Gh
                                                  arbi

                                                  Component 3: Institutional S                   Sélection fondée s
 02/PI/S/PSEA/2022 / Audit or                                                                                        Open - Internationa
                                IDA / D5710       upport, Capacity Building an A posteriori      ur la qualité et le                                                       0.00   Signé               2022-07-07      2022-06-20   2022-07-28                  2022-09-15   2022-01-01                          2022-10-20   2022-12-05   2022-11-19   2022-12-16   2023-01-05   2023-02-10   2023-02-09   2023-03-20   2023-06-14
ganisationnel de la SNDE                                                                                             l
                                                  d Project Management                           coût


                                                  Component 3: Institutional S                   Sélection fondée s
 02/PI/PSEA/2022 / Audit orga
                              IDA / D5710         upport, Capacity Building an A posteriori      ur les qualification Open - National                                      0.00   Annulé              2022-06-09      2022-06-14   2022-06-30                  2022-08-13                                                                                           2022-09-12                2022-10-17                2023-04-15
nisationnel de la SNDE
                                                  d Project Management                           s des consultants


 MR-WSSP-329496-CS-QCBS /
SELECTION DES CONSULTAN
T SUR LA BASE DE QUALITE E
T COUT POUR LA REALISATIO
N DE L'ETUDE ET ASSURER L                         Component 4: Contingency                       Sélection fondée s
                                                                                                                     Open - Internationa
E CONTROLE DES TRAVAUX     IDA / D5710            Emergency Response Comp       A priori         ur la qualité et le                                                       0.00   Annulé              2022-12-15                   2023-01-05                  2023-02-18                                       2023-03-18                2023-04-17                2023-05-22                2023-06-26                2024-06-25
                                                                                                                     l
ETUDE                                             onent                                          coût
APD ET DAO
SELECTION DES L4ENTREPRI
SE DE TRAVAUX
CONTROLE


                                                  Component 1: Improvement
 MR-WSSP-336560-CS-CQS /                                                                         Sélection fondée s
                                                  of access to drinking water a                                                                                                   En cours d'exame
Recrutement de firme pour él IDA / D5710                                        A posteriori     ur les qualification Open - National                                      0.00                       2023-01-20      2023-02-07   2023-02-10                  2023-03-26                                                                                           2023-04-25                2023-05-30                2023-11-26
                                                  nd sanitation in Gorgol, Guid                                                                                                   n
aboration de NIES forages                                                                        s des consultants
                                                  imakha and Assaba


                                                  Component 1: Improvement
 23/PI/PSEA/2023 / Recrutem                                                                      Sélection fondée s
                                                  of access to drinking water a                                                                                                   En attente d'exéc
ent de firme pour élaboration IDA / D5710                                       A posteriori     ur les qualification Open - National                                      0.00                       2023-09-15                   2023-10-06                  2023-11-19                                                                                           2023-12-19                2024-01-23                2024-07-21
                                                  nd sanitation in Gorgol, Guid                                                                                                   ution
de NIES forages                                                                                  s des consultants
                                                  imakha and Assaba


 24/PI/PSEA/2023 / Recrutem                       Component 3: Institutional S                   Sélection fondée s
                                                                                                                                                                                  En attente d'exéc
ent de cabinet de consultant    IDA / D5710       upport, Capacity Building an A posteriori      ur les qualification Open - National                                      0.00                       2024-02-26                   2024-03-18                  2024-05-01                                                                                           2024-05-31                2024-07-05                2024-10-03
                                                                                                                                                                                  ution
pour élaboration d’un invent                      d Project Management                           s des consultants
aire ONSER

 MR-WSSP-394972-CS-CQS /
                                                  Component 1: Improvement
Recrutement d’une ONG part                                                                       Sélection fondée s
                                                  of access to drinking water a                                                                                                   En cours d'exécut
enaire de mise en œuvre du IDA / D5710                                          A posteriori     ur les qualification Limited                                              0.00                       2023-12-15      2024-01-09                               2023-12-29                                                                                           2024-01-28                2024-03-03                2024-08-30
                                                  nd sanitation in Gorgol, Guid                                                                                                   ion
programme de prévention et                                                                       s des consultants
                                                  imakha and Assaba
d’atténuation des risques de
VBG-EAS/HS

 MR-WSSP-394982-CS-CQS /
                                                  Component 3: Institutional S                   Sélection fondée s
Recrutement de trois ONG ch                                                                                                                                                       En cours d'exécut
                             IDA / D5710          upport, Capacity Building an A posteriori      ur les qualification Open - National                                      0.00                       2024-02-05      2024-03-25   2024-02-26                  2024-04-10                                                                                           2024-05-10                2024-06-14                2024-10-12
argées de mener les campag                                                                                                                                                        ion
                                                  d Project Management                           s des consultants
nes de sensibilisation au ca
mp de Mberra

 MR-WSSP-394987-CS-QCBS /
                                                  Component 3: Institutional S                   Sélection fondée s
Recrutement de cabinet de c                                                                                                                                                       En attente d'exéc
                               IDA / D5710        upport, Capacity Building an A posteriori      ur la qualité et le Open - National                                       0.00                       2024-02-19                   2024-03-11                  2024-04-24                                       2024-05-22                2024-06-21                2024-07-26                2024-08-30                2025-02-26
onsultants pour élaboration d                                                                                                                                                     ution
                                                  d Project Management                           coût
’un audit technique et financi
er et RH ONSER




                                                                                                                                                                                                                                         Page 3
                                                 Component 2: Improving sus
 MR-WSSP-394996-CS-CQS /
                                                 tainable access to safe wate                   Sélection fondée s
Recrutement de firmes pour                                                                                                                                                  En attente d'exéc
                              IDA / D5710        r and sanitation for refugees A posteriori     ur les qualification Open - National                                 0.00                       2024-02-26                2024-03-18                  2024-05-01                                                                2024-05-31   2024-07-05   2024-11-02
élaboration de EIES 2 centres                                                                                                                                               ution
                                                 and host communities in Ho                     s des consultants
SNDE
                                                 dh Echargui and Hodh El Gh
                                                 arbi



INDIVIDUAL CONSULTANTS
Activity Reference No. /       Loan / Credit N                                                                       Market Approac                         Actual Amount                                                 Invitation to Identifie Draft Negotiated Cont
                                                        Component                 Review Type       Method                                  Contract Type                   Process Status      Teams of Reference                                                                Signed Contract         Contract Completion
       Description                    o.                                                                                    h                                   (US$)                                                     d/Selected Consultant            ract
                                                                                                                                                                                                Planned       Actual       Planned       Actual    Planned      Actual          Planned       Actual      Planned      Actual
                                                 Component 3: Institutional S
 01/PI/PSEA/2020 / Recrutem
                               IDA / D5710       upport, Capacity Building an A posteriori      Individuel           Open                                            0.00   Signé               2020-12-24   2020-06-19   2021-02-11     2020-06-23   2021-03-04   2020-07-27   2021-04-08   2020-09-22   2021-10-05
ent RAF UCP
                                                 d Project Management


                                                 Component 3: Institutional S
 02/PI/PSEA/2020 / Recrutem
                               IDA / D5710       upport, Capacity Building an A posteriori      Individuel           Open                                            0.00   Signé               2020-12-24   2020-06-19   2021-02-11     2020-06-22   2021-03-04   2020-07-27   2021-04-08   2020-09-23   2021-10-05
ent SPM UCP
                                                 d Project Management


                                                 Component 3: Institutional S
 03/PI/PSEA/2020 / Recrutem
                               IDA / D5710       upport, Capacity Building an A posteriori      Individuel           Open                                            0.00   Signé               2020-12-24   2020-06-19   2021-02-11     2020-06-22   2021-03-04   2021-07-27   2021-04-08   2020-09-22   2021-10-05
ent Assistant SPM UCP
                                                 d Project Management


 04/PI/PSEA/2020 / Recrutem                      Component 3: Institutional S
ent Spécialiste Environneme    IDA / D5710       upport, Capacity Building an A posteriori      Individuel           Open                                            0.00   Signé               2020-12-23   2021-01-17   2021-02-10     2021-02-17   2021-03-03   2021-02-23   2021-04-07   2021-02-27   2021-10-04
nt - Santé - Sécurité                            d Project Management


 05/PI/PSEA/2020 / Recrutem                      Component 3: Institutional S
ent Spécialiste des Questions IDA / D5710        upport, Capacity Building an A posteriori      Individuel           Open                                            0.00   Signé               2020-12-23   2021-01-17   2021-02-10     2021-02-23   2021-03-03   2021-02-23   2021-04-07   2021-02-26   2021-10-04
Sociales et Genre                                d Project Management


                                                 Component 3: Institutional S
 06/PI/PSEA/2021 / Recrutem
                               IDA / D5710       upport, Capacity Building an A posteriori      Individuel           Open                                            0.00   Signé               2021-01-07   2021-01-27   2021-02-25     2021-03-31   2021-03-18   2021-03-31   2021-04-22   2021-04-08   2021-10-19
ent Auditeur Interne
                                                 d Project Management


                                                 Component 3: Institutional S
 08/PI/PSEA/2021 / Recrutem
                               IDA / D5710       upport, Capacity Building an A posteriori      Individuel           Open                                            0.00   Signé               2021-01-28   2021-01-27   2021-03-18     2021-03-31   2021-04-08   2021-03-31   2021-05-13   2021-04-07   2021-11-09
ent comptable
                                                 d Project Management


                                                 Component 3: Institutional S
 09/PI/PSEA/2021 / Recrutem
                               IDA / D5710       upport, Capacity Building an A posteriori      Individuel           Open                                            0.00   Signé               2021-01-28   2021-01-27   2021-03-18     2021-03-31   2021-04-08   2021-03-31   2021-05-13   2021-04-08   2021-11-09
ent Assisante de Direction
                                                 d Project Management


                                                 Component 3: Institutional S
 10/PI/PSEA/2021 / Recrutem
                               IDA / D5710       upport, Capacity Building an A posteriori      Individuel           Open                                            0.00   Annulé              2021-03-15                2021-05-03                  2021-05-24                2021-06-28                2021-12-25
ent Logisticien
                                                 d Project Management


 11/PI/PSEA/2021 / Recrutem
                                                 Component 3: Institutional S
ent des jeunes diplômés com                                                                                                                                                 En attente d'exéc
                               IDA / D5710       upport, Capacity Building an A posteriori      Individuel           Open                                            0.00                       2021-04-12                2021-05-31                  2021-06-21                2021-07-26                2022-01-22
me stagiaires(en lieu et plac                                                                                                                                               ution
                                                 d Project Management
e d'agents administratifs et d
e suivi)

                                                 Component 3: Institutional S
 18/PI/PSEA/2021 / Recrutem
                               IDA / D5710       upport, Capacity Building an A posteriori      Individuel           Limited                                         0.00   Annulé              2021-04-12                2021-04-17                  2021-05-08                2021-06-12                2021-12-09
ent chauffeurs
                                                 d Project Management


                                                 Component 3: Institutional S
 19/PI/PSEA/2021 / Recrutem
                               IDA / D5710       upport, Capacity Building an A posteriori      Individuel           Limited                                         0.00   Annulé              2021-02-10                2021-02-15                  2021-03-08                2021-04-12                2021-10-09
ent Gardiens
                                                 d Project Management


                                                 Component 3: Institutional S
 20/PI/PSEA/2021 / Recrutem
                               IDA / D5710       upport, Capacity Building an A posteriori      Individuel           Limited                                         0.00   Annulé              2021-02-09                2021-02-14                  2021-03-07                2021-04-11                2021-10-08
ent Plantons
                                                 d Project Management


 MR-WSSP-394970-CS-INDV /                        Component 3: Institutional S
                                                                                                                                                                            En cours d'exécut
Recrutement d’un Gestionnai IDA / D5710          upport, Capacity Building an A posteriori      Individuel           Limited                                         0.00                       2023-12-11   2024-05-07   2023-12-16                  2024-01-06                2024-02-10                2025-02-09
                                                                                                                                                                            ion
re 2 de contrat                                  d Project Management


 MR-WSSP-394971-CS-INDV /                        Component 3: Institutional S
                                                                                                                                                                            En cours d'exécut
Recrutement d’un assistant d IDA / D5710         upport, Capacity Building an A posteriori      Individuel           Limited                                         0.00                       2023-12-11   2023-12-18   2023-12-16                  2024-01-06                2024-02-10                2025-02-09
                                                                                                                                                                            ion
u spécialiste en Passation de                    d Project Management
s Marchés

 MR-WSSP-394997-CS-CDS /                         Component 2: Improving sus
Elaboration de NIES pour réh                     tainable access to safe wate                   Sélection de cons
                                                                                                                     Direct - Internation                                   En attente d'exéc
abilitation du réseau et des b IDA / D5710       r and sanitation for refugees A posteriori     ultants par entent                                                   0.00                       2024-01-30                2024-02-09                                            2024-04-14                2024-06-13
                                                                                                                     al                                                     ution
oues de vidange du camp MB                       and host communities in Ho                     e directe
erra                                             dh Echargui and Hodh El Gh
                                                 arbi

 MR-WSSP-431948-CS-INDV /
                                                 Component 3: Institutional S
Recrutement d'un hydrogéol                                                                                                                                                  En attente d'exéc
                               IDA / D5710       upport, Capacity Building an A posteriori      Individuel           Open - National                                 0.00                       2024-07-04                2024-08-22                  2024-09-12                2024-10-17                2025-04-15
ogue expert en évaluation et                                                                                                                                                ution
                                                 d Project Management
cartographie des ressources
en eau




                                                                                                                                                                                                                                Page 4