IBRD/IDA Climate Finance Assessment Sheet   Guidance:   Climate Finance in IBRD/IDA projects is determined based on the Joint MDB Methodologies for Tracking Climate Adaptation Finance and Climate Mitigation Finance. The Adaptation and Mitigation Finance categories in the table below refer to those used in the  Joint Reports on MDBs’ Climate Finance. •Total Adapta on Finance and Total Mi ga on Finance in the table below refer to the full cost of adapta on and mi ga on measures, respec vely. •Dual-Benefit Finance refers to Climate Finance that contributes to both adapta on and mi ga on.  •To avoid double coun ng, Total Climate Finance is calculated by summing up Total Adapta on Finance and Total Mi ga on Finance while subtrac ng Dual-Benefit Finance.  •Adapta on Finance as part of Total Climate Finance equals Total Adapta on Finance minus 50% of Dual-Benefit Finance. •Mi ga on Finance as part of Total Climate Finance equals Total Mi ga on Finance minus 50% of Dual-Benefit Finance.    Numbers in the table below may not add up due to rounding.  Project information   Project ID   P179017 Project Name   Guinea Water and Sanitation Project IBRD/IDA financing ($M)   200.00 Global Practice   Water Region  AFW Country  Guinea Fiscal Year  FY25 Climate Finance Overview   Total Climate Finance ($M)   167.33 Total Climate Finance (%)  83.67% Total Adaptation Finance ($M)  22.06 Total Mitigation Finance ($M)   158.12 Dual-Benefit Finance ($M)   12.84 Adaptation Finance as part of Total Adaptation Finance as part of Total Climate Finance 15.64 9% Climate Finance ($M) (%)  Mitigation Finance as part of Total Mitigation Finance as part of Total Climate Finance 151.70 91% Climate Finance ($M)  (%)  Detailed Climate Finance Assessment   Adaptation Mitigation Total Total Dual- Finance as Finance as Component/Subcomponent (SC) / Total Total IBRD/IDA Climate Benefit part of Total part of Total Prior Action (PA) / Disbursement Adaptation Joint MDB Adaptation Finance Category  Mitigation Joint MDB Mitigation Finance Category  Financing Finance Finance Climate Climate Linked Indicator (DLI)   Finance ($M)  Finance ($M)  ($M)  ($M) ($M) Finance Finance ($M)  ($M)  Sub-Component 1.1 Increasing water  production through a new treatment  99.00 99.00 9.90 Water and wastewater systems 99.00 6. WATER SUPPLY AND WASTEWATER 9.90 4.95 94.05 plant Sub-Component 1.2 Storage tanks and  28.00 21.00 8.40 Water and wastewater systems 14.00 6. WATER SUPPLY AND WASTEWATER 1.40 7.70 13.30 distribution system  Sub-Component 1.3 Non-revenue water  25.00 25.00 0.00 25.00 6. WATER SUPPLY AND WASTEWATER 0.00 0.00 25.00 (NRW) reduction Sub-Component 1.4 Compensation of  13.00 12.40 1.57 Cross-cutting sectors 11.80 12. CROSS-SECTORAL ACTIVITIES 0.97 1.08 11.32 Project Affected Persons (PAPs)  Sub-Component 2.1 Support to the  implementation of urban water sector  2.00 0.00 0.00 0.00 0.00 0.00 0.00 reforms Sub-Component 2.2 Support to SEG  utility strengthening and turnaround  10.00 0.00 0.00 0.00 0.00 0.00 0.00 program  Sub-Component 2.3 Support to  2.00 0.20 0.00 0.20 12. CROSS-SECTORAL ACTIVITIES 0.00 0.00 0.20 sanitation governance arrangements Sub-Component 2.4 Water, sanitation  9. BUILDINGS, PUBLIC INSTALLATIONS AND END-USE  10.00 2.00 1.00 Water and wastewater systems 1.00 0.00 1.00 1.00 and hygiene (WASH) in schools ENERGY EFFICIENCY Component 3.1 Nature-based solutions  (NBS) to control soil erosion and  0.00 0.00 0.00 0.00 0.00 0.00 0.00 reservoir sedimentation  Component 3.2 Community engagement  0.00 0.00 0.00 0.00 0.00 0.00 0.00 for sound water resource management  Sub-Component 3.3. Protection  2.00 0.20 0.20 Water and wastewater systems 0.00 0.00 0.20 0.00 perimeters for water supply boreholes  Sub-Component 4.1 Project  7.00 5.86 0.77 Cross-cutting sectors 5.53 12. CROSS-SECTORAL ACTIVITIES 0.45 0.55 5.31 Management  Sub-Component 4.2. Technical Assistance  2.00 1.67 0.22 Cross-cutting sectors 1.58 12. CROSS-SECTORAL ACTIVITIES 0.13 0.16 1.52 to Implementation Agencies  Component 5. Contingent Emergency  0.00 0.00 0.00 0.00 0.00 0.00 0.00 Response Component (CERC)