PROCUREMENT PLAN (Draft) Project information: Brazil: Espirito Santo Water Security Management Project (P176982) Project Implementation agency: AGERH – State Water Resources Agency (Agência Estadual de Recursos Hídricos) Date of the Procurement Plan: [insert date] Period covered by this Procurement Plan: [insert from – to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Not Applicable PROCUREMENT Brazil : Brazil: Espirito Santo Water Security Management Project PLAN General Information Country: Brazil 2023-02-01 Bank’s Approval Date of the Original Procurement Plan: 2025-05-19 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P176982 GPN Date: Project Name: Brazil: Espirito Santo Water Security Management Project Loan / Credit No: / , IBRD / 95190 Secretariat for Environment and Water Resources of the State of Espírito Santo Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Solicitação de Ofe BR-AGERH-ES-329927-CW-R 2) Demonstrating climate-s rtas - Pequenas O FB / Construcao do projeto e Implementa mart integrated water securi Solicitação de Ofe Single Stage - One E bras Documento 2028-05-2 obras de implantacao do Cen IBRD / 95190 Posterior Open - National 4,450,000.00 0.00 ção Pendent 2024-09-23 2024-11-12 2024-12-24 2025-02-12 2025-03-31 ty risk reduction approaches rtas nvelope Padrão de Aquisiç 9 tro Especializado em Respost e in selected basins ão (DPA) - proces a a Desastres (CERD). CEPDE so de 1 envelope C GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-AGERH-ES-335607-GO-R 2) Demonstrating climate-s FB / Aquisicoes para implant mart integrated water securi Solicitação de Ofe Single Stage - One E Implementaç / Posterior Open - National 908,000.00 0.00 2024-08-20 2024-08-25 2024-10-06 2024-11-05 2024-12-10 2029-06-07 acao de fossas septicas. SEA ty risk reduction approaches rtas nvelope ão Pendente MA in selected basins BR-AGERH-ES-335529-GO-R 1) Building the Borrower’s c Em fase de I Solicitação de Ofe Open - Internationa Single Stage - One E FB / Aquisicao de veiculos Au / apacity for water security in Posterior 3,150,000.00 0.00 mplementaç 2023-10-27 2025-03-26 2023-11-01 2023-12-13 2024-01-12 2024-02-16 2025-02-15 rtas l nvelope to Plataforma Escada (02 uni a changing climate ão d). CEPDEC BR-AGERH-ES-329986-GO-R FB / Aquisicao de (i) equipam 1) Building the Borrower’s c Solicitação de Ofe Single Stage - One E Implementaç entos e (ii) materiais consum / apacity for water security in Posterior Open - National 706,000.00 0.00 2023-11-06 2023-11-11 2023-12-23 2024-01-22 2024-02-26 2025-02-25 rtas nvelope ão Pendente iveis, vidrarias e reagentes p a changing climate ara analise de qualidade de a gua no LACAR. AGERH BR-AGERH-ES-334714-GO-R FB / Fornecimento e instalac 1) Building the Borrower’s c ao de estacoes hidrologicas t Solicitação de Ofe Single Stage - One E Implementaç / apacity for water security in Posterior Open - National 500,000.00 0.00 2023-12-15 2023-12-20 2024-01-31 2024-03-01 2024-04-05 2029-10-02 elemetricas e seus respectiv rtas nvelope ão Pendente a changing climate os lances de reguas e pecas de reposicao, incluindo perio do de manutencao. AGERH BR-AGERH-ES-336175-GO-R 2) Demonstrating climate-s FB / Microlocalizacao, aquisic mart integrated water securi Solicitação de Ofe Single Stage - One E ao e instalacao das estacoes IBRD / 95190 Posterior Open - National 400,000.00 0.00 Cancelado 2024-08-01 2024-08-06 2024-09-17 2024-10-17 2024-11-21 2029-05-25 ty risk reduction approaches rtas nvelope telemetricas (fluviometrica), i in selected basins ncluindo manutencao. AGER H BR-AGERH-ES-335535-GO-R 2) Demonstrating climate-s FB / Aquisicao de equipamen mart integrated water securi Solicitação de Ofe Single Stage - One E Implementaç IBRD / 95190 Posterior Open - National 100,000.00 0.00 2024-08-01 2024-09-20 2024-11-01 2024-12-01 2025-01-16 2025-07-15 tos de tecnologia da informa ty risk reduction approaches rtas nvelope ão Pendente cao. SEAMA in selected basins BR-AGERH-ES-438055-GO-R 2) Demonstrating climate-s FB / Microlocalizacao, aquisic mart integrated water securi Solicitação de Ofe Single Stage - One E Implementaç ao e instalacao das estacoes IBRD / 95190 Posterior Open - National 700,000.00 0.00 2025-09-23 2025-09-28 2025-11-09 2025-12-09 2026-01-13 2026-07-12 ty risk reduction approaches rtas nvelope ão Pendente telemetricas (fluviometrica e in selected basins pluviometrica), incluindo ma nutencao. AGERH BR-SEAMA-489037-GO-RFQ / Aquisição de equipamentos d Solicitação de Cot Single Stage - One E Implementaç e tecnologia da informação p IBRD / 95190 4) Project Management Posterior Open - National 50,000.00 0.00 2025-06-20 2025-08-15 2025-12-13 ações nvelope ão Pendente ara suporte a Unidade Gestor a do Programa - UGP NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-AGERH-ES-340830-NC-RF 2) Demonstrating climate-s Q / Manutencao corretiva e e mart integrated water securi Solicitação de Cot Single Stage - One E Implementaç / Posterior Open - National 100,000.00 0.00 2023-10-23 2023-12-18 2028-12-16 volutiva do Portal Reflorestar ty risk reduction approaches ações nvelope ão Pendente . SEAMA in selected basins BR-AGERH-ES-336017-NC-RF 2) Demonstrating climate-s B / Implantacao de plano de mart integrated water securi Solicitação de Ofe Single Stage - One E Implementaç / Posterior Open - National 100,000.00 0.00 2024-08-22 2024-08-27 2024-10-08 2024-11-07 2024-12-12 2029-12-11 monitoramento da agua nas ty risk reduction approaches rtas nvelope ão Pendente bacias selecionadas. SEAMA in selected basins 2) Demonstrating climate-s BR-AGERH-ES-335612-NC-RF mart integrated water securi Solicitação de Cot Single Stage - One E Implementaç Q / Servicos de graficas e pa / Posterior Open - National 30,000.00 0.00 2023-10-25 2023-12-20 2024-12-14 ty risk reduction approaches ações nvelope ão Pendente pelaria. SEAMA in selected basins BR-AGERH-ES-336011-NC-RF B / Prestacao de servicos de publicacao e divulgacao das l Solicitação de Ofe Single Stage - One E Implementaç IBRD / 95190 4) Project Management Posterior Open - National 150,000.00 0.00 2023-06-26 2023-07-01 2023-08-12 2023-09-11 2023-10-16 2028-10-14 icitacoes do Programa em jor rtas nvelope ão Pendente nal de circulacao nacional e de maior circulacao local. AG ERH BR-AGERH-ES-431482-NC-RF Em fase de I Solicitação de Ofe Single Stage - One E P / Sistema de Gestao Financ IBRD / 95190 4) Project Management Posterior Open - National 1,017,788.00 0.00 mplementaç 2024-06-06 2024-07-08 2024-06-29 2024-07-24 2024-10-14 2024-08-08 2024-11-12 2024-09-12 2029-06-30 rtas nvelope eira (Suporte). AGERH ão Page 1 BR-SEAMA-488789-NC-RFQ / Contratação de empresa par Solicitação de Cot Single Stage - One E Implementaç a realização de auditoria fina IBRD / 95190 4) Project Management Posterior Open - National 150,000.00 0.00 2025-06-20 2025-08-15 2030-08-14 ações nvelope ão Pendente nceira do Programa Águas e Paisagem II. UGP SEAMA. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-AGERH-ES-329921-CS-Q 2) Demonstrating climate-s Seleção Baseada CBS / Plano de gestao de risc mart integrated water securi Open - Internationa Em fase de Imple / Posterior na Qualidade e Cu 2,200,000.00 0.00 2023-08-14 2024-10-24 2023-09-04 2024-12-27 2023-10-18 2023-11-15 2023-12-15 2024-01-19 2024-02-23 2025-02-22 os de inundacao da bacia do ty risk reduction approaches l mentação sto rio Itapemirim. AGERH in selected basins BR-AGERH-ES-329973-CS-Q 1) Building the Borrower’s c Seleção Baseada CBS / Desenvolvimento do Si Implementação P / apacity for water security in Posterior na Qualidade e Cu Open - National 300,000.00 0.00 2023-10-31 2023-11-21 2024-01-04 2024-02-01 2024-03-02 2024-04-06 2024-05-11 2025-05-11 stema de Comando em Oper endente a changing climate sto ações Digital (SCO). CEPDEC BR-AGERH-ES-329902-CS-Q CBS / Fortalecimento instituci onal da AGERH atraves de e 1) Building the Borrower’s c Seleção Baseada mpresa especializada para di Implementação P / apacity for water security in Posterior na Qualidade e Cu Open - National 500,000.00 0.00 2023-07-17 2023-08-07 2023-09-20 2023-10-18 2023-11-17 2023-12-22 2024-01-26 2029-01-25 agnosticar as lacunas relacio endente a changing climate sto nadas a capacitacao alem de elaborar plano e realizar curs os para suprir as necessidad es identificadas. AGERH BR-AGERH-ES-329922-CS-Q 1) Building the Borrower’s c Seleção Baseada CBS / Elaboracao de diagnost Open - Internationa Em fase de Imple / apacity for water security in Posterior na Qualidade e Cu 520,000.00 0.00 2023-07-31 2025-02-04 2023-08-21 2025-03-12 2023-10-04 2023-11-01 2023-12-01 2024-01-05 2024-02-09 2025-02-08 ico da disponibilidade hidrica l mentação a changing climate sto e regionalizacao de vazoes. AGERH BR-AGERH-ES-329934-CS-Q CBS / Elaboracao de Mapeam ento hidrogeologico detalhad o dos aquiferos Barreiras, Rio 1) Building the Borrower’s c Seleção Baseada Open - Internationa Implementação P Doce e Fraturado na Regiao / apacity for water security in Posterior na Qualidade e Cu 640,000.00 0.00 2023-08-07 2023-08-28 2023-10-11 2023-11-08 2023-12-08 2024-01-12 2024-02-16 2025-02-15 l endente Metropolitana de Vitoria e pr a changing climate sto opostas de rede de monitora mento e de gestao integrada das aguas superficiais e subt erraneas. AGERH BR-AGERH-ES-334744-CS-Q Seleção Baseada CBS / Apoio tecnico operacio Open - Internationa Em fase de Imple / 4) Project Management Posterior na Qualidade e Cu 3,498,810.00 0.00 2023-07-10 2024-05-01 2023-07-31 2024-11-27 2023-09-13 2025-04-07 2023-10-11 2023-11-10 2023-12-15 2024-01-19 2029-07-17 nal para auxiliar na gestão d l mentação sto o Programa Aguas e Paisage m II. AGERH BR-AGERH-ES-340833-CS-LC S / Servicos de supervisao de 1) Building the Borrower’s c Seleção Baseada Implementação P elaboracao do projeto e obra / apacity for water security in Posterior Open - National 110,000.00 0.00 2024-09-05 2024-09-26 2024-11-09 2024-12-07 2025-01-06 2025-02-10 2025-03-17 2028-03-16 no Menor Custo endente do Centro Especializado de R a changing climate esposta a Desastres (CERD). CEPDEC BR-AGERH-ES-329977-CS-Q CBS / Elaboração de estudo p 2) Demonstrating climate-s Seleção Baseada ara propor o dimensionamen mart integrated water securi Implementação P / Posterior na Qualidade e Cu Open - National 200,000.00 0.00 2023-08-21 2023-09-11 2023-10-25 2023-11-22 2023-12-22 2024-01-26 2024-03-01 2025-03-01 to de uma rede de monitora ty risk reduction approaches endente sto mento hidrologico da bacia h in selected basins idrográfica do rio Itapemirim. AGERH BR-AGERH-ES-333987-CS-Q CBS / Desenvolvimento do Si 1) Building the Borrower’s c Seleção Baseada stema de Informacoes sobre Implementação P / apacity for water security in Posterior na Qualidade e Cu Open - National 400,000.00 0.00 2024-09-12 2024-10-03 2024-11-16 2024-12-14 2025-01-13 2025-02-17 2025-03-24 2027-03-24 Recursos Hidricos do Estado endente a changing climate sto do Espirito Santo e acoplame nto do sistema de suporte a decisao de outorga. AGERH BR-AGERH-ES-329978-CS-Q CBS / Elaboração de estudos Seleção Baseada de alternativas de solucoes p 3) Reducing flood risk in targ Implementação P / Posterior na Qualidade e Cu Open - National 400,000.00 0.00 2023-08-28 2023-09-18 2023-11-01 2023-11-29 2023-12-29 2024-02-02 2024-03-08 2025-03-08 ara reducao de risco a inund eted municipalities endente sto acao na bacia do rio Beneven te e rio Novo (Municipios de Alfredo Chaves e Iconha). AG ERH BR-AGERH-ES-329967-CS-Q CBS / Aprimoramento do inst 1) Building the Borrower’s c Seleção Baseada Implementação P rumento de outorga e alocac / apacity for water security in Posterior na Qualidade e Cu Open - National 460,000.00 0.00 2023-07-24 2023-08-14 2023-09-27 2023-10-25 2023-11-24 2023-12-29 2024-02-02 2026-02-01 endente ao negociada, incluindo o sist a changing climate sto ema de suporte a decisao a o utorga. AGERH BR-AGERH-ES-333988-CS-Q CBS / Desenvolvimento de es 1) Building the Borrower’s c Seleção Baseada tudos visando sustentabilida Implementação P / apacity for water security in Posterior na Qualidade e Cu Open - National 300,000.00 0.00 2024-09-07 2024-09-28 2024-11-11 2024-12-09 2025-01-08 2025-02-12 2025-03-19 2026-09-15 de financeira para gestao do endente a changing climate sto s recursos hidricos, incluindo instrumentos economicos. A GERH BR-AGERH-ES-329975-CS-Q 2) Demonstrating climate-s Seleção Baseada CBS / Contratacao de empres mart integrated water securi Open - Internationa Implementação P IBRD / 95190 Posterior na Qualidade e Cu 1,372,607.00 0.00 2023-10-11 2023-11-01 2023-12-15 2024-01-12 2024-02-11 2024-03-17 2024-04-21 2025-04-21 a para assistencia tecnica e i ty risk reduction approaches l endente sto ntervencoes fisicas (PSA). SE in selected basins AMA BR-AGERH-ES-384179-CS-LC S / Contratacao de empresa Seleção Baseada para realizacao de auditoria f IBRD / 95190 4) Project Management Posterior Open - National 100,000.00 0.00 Cancelado 2024-07-01 2024-07-22 2024-09-04 2024-10-02 2024-11-01 2024-12-06 2025-01-10 2025-07-09 no Menor Custo inanceira do Programa Aguas e Paisagem II. AGERH BR-AGERH-ES-329983-CS-Q 2) Demonstrating climate-s CBS / Desenvolvimento do Si Seleção Baseada mart integrated water securi Implementação P stema de previsao e alerta (i IBRD / 95190 Posterior na Qualidade e Cu Open - National 600,000.00 0.00 2024-08-15 2024-09-05 2024-10-19 2024-11-16 2024-12-16 2025-01-20 2025-02-24 2026-02-24 ty risk reduction approaches endente ncluindo capacitacao e manu sto in selected basins tencao) e emissao de boletin s. AGERH BR-SEAMA-464809-CS-QCBS / CONTRATAÇÃO DE CONSUL 2) Demonstrating climate-s Seleção Baseada TORIA PARA ELABORAR OS P mart integrated water securi Open - Internationa Em fase de Imple IBRD / 95190 Posterior na Qualidade e Cu 652,756.00 0.00 2024-12-03 2024-12-11 2025-01-02 2024-12-27 2025-02-15 2025-03-15 2025-04-14 2025-05-19 2025-06-23 2026-12-23 LANOS DE PREPARAÇÃO A SE ty risk reduction approaches l mentação sto CAS E DE USO RACIONAL DO in selected basins S RECURSOS HÍDRICOS DO E SPÍIRTO SANTO. Page 2 BR-SEAMA-483413-CS-QCBS / Contratação de empresa de 2) Demonstrating climate-s Consultoria especializada par Seleção Baseada mart integrated water securi Em fase de Imple a elaboração da modelagem IBRD / 95190 Posterior na Qualidade e Cu Open - National 426,395.41 0.00 2025-03-19 2025-03-20 2025-04-18 2025-06-02 2025-06-20 2025-06-30 2025-07-31 2025-11-30 2027-01-30 ty risk reduction approaches mentação institucional, plano estratégic sto in selected basins o e sustentabilidade financeir a do Programa Reflorestar. UI P SEAMA. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR-AGERH-ES-335522-CS-IN Implementação P DV / Consultor individual par / 4) Project Management Posterior Individual Open - National 252,000.00 0.00 2023-09-15 2023-11-03 2023-11-24 2023-12-29 2029-12-28 endente a apoio em gestao Financeira . AGERH BR-AGERH-ES-334749-CS-IN DV / Consultor individual par Implementação P / 4) Project Management Posterior Individual Open - National 90,000.00 0.00 2023-09-22 2023-11-10 2023-12-01 2024-01-05 2026-01-04 a prestar apoio em aquisicoe endente s (DER-ES). AGERH BR-AGERH-ES-335519-CS-IN Implementação P DV / Consultor individual par / 4) Project Management Prévia Individual Open - National 200,000.00 0.00 2023-09-27 2023-11-15 2023-12-06 2024-01-10 2029-07-08 endente a apoio em Aquiscoes/Step. AGERH BR-AGERH-ES-334746-CS-IN Implementação P DV / Consultor individual com / 4) Project Management Posterior Individual Open - National 180,000.00 0.00 2023-09-29 2023-11-17 2023-12-08 2024-01-12 2029-07-10 endente especialidade na área juridic a. AGERH BR-AGERH-ES-335521-CS-IN DV / Consultor individual par Em fase de Imple / 4) Project Management Posterior Individual Open - National 180,000.00 0.00 2023-10-04 2024-11-04 2023-11-22 2025-04-17 2023-12-13 2025-05-08 2024-01-17 2029-01-16 a realizar o monitoramento e mentação controle do Programa. AGER H BR-AGERH-ES-334747-CS-IN DV / Consultor individual esp Implementação P / 4) Project Management Posterior Individual Open - National 150,000.00 0.00 2023-10-06 2023-11-24 2023-12-15 2024-01-19 2029-01-18 ecialista em suporte tecnico endente administrativo e operacional. AGERH BR-AGERH-ES-334775-CS-IN DV / Consultor individual esp / 4) Project Management Posterior Individual Open - National 176,668.00 0.00 Cancelado 2023-07-03 2023-08-21 2023-09-11 2023-10-16 2028-10-15 ecialista em gestao ambienta l. AGERH BR-AGERH-ES-334781-CS-IN DV / Consultor individual esp / 4) Project Management Posterior Individual Open - National 176,668.00 0.00 Cancelado 2023-07-03 2023-08-21 2023-09-11 2023-10-16 2028-10-15 ecialista em gestao social. A GERH BR-AGERH-ES-335517-CS-IN DV / Consultor individual esp / 4) Project Management Posterior Individual Open - National 176,664.00 0.00 Cancelado 2023-07-10 2023-08-28 2023-09-18 2023-10-23 2028-10-22 ecialista em comunicacao so cial. AGERH BR-AGERH-ES-383685-CS-IN DV / Contratação de Consulto Em fase de Imple r Individual Financeiro para a IBRD / 95190 4) Project Management Posterior Individual Open - National 252,000.00 0.00 2024-06-20 2024-06-20 2024-08-08 2025-02-04 2024-08-29 2025-03-21 2024-10-03 2030-04-05 mentação poio ao Núcleo Gestor Admin istrativo-Financeiro durante a duração do projeto BR-AGERH-ES-430675-CS-C Seleção Direta de DS / Consultor individual esp IBRD / 95190 4) Project Management Posterior Direct - National 30,423.18 0.00 Assinado 2024-06-10 2024-06-20 2024-06-20 2024-08-21 2024-08-24 2025-08-24 Consultores ecialista em comunicação so cial. BR-AGERH-ES-431105-CS-C Seleção Direta de DS / Consultor individual esp IBRD / 95190 4) Project Management Posterior Direct - National 51,386.19 0.00 Assinado 2024-06-10 2024-06-20 2024-06-20 2024-08-21 2024-08-24 2024-09-30 2025-08-24 Consultores ecialista em gestão ambienta l. BR-AGERH-ES-430680-CS-C Seleção Direta de Em fase de Imple DS / Consultor individual esp IBRD / 95190 4) Project Management Posterior Direct - National 30,072.64 0.00 2024-06-10 2024-06-21 2024-06-20 2024-08-21 2024-08-24 2025-08-24 Consultores mentação ecialista em gestão social. BR-AGERH-ES-335520-CS-IN DV / Consultor individual par Em fase de Imple IBRD / 95190 4) Project Management Prévia Individual Open - National 230,278.00 0.00 2024-06-24 2024-08-20 2024-08-12 2025-02-04 2024-09-02 2025-03-21 2024-10-07 2029-10-06 a apoio em aquisicoes (AGER mentação H CEPDEC SEAMA). AGERH BR-AGERH-ES-438057-CS-C DS / Elaboração de estudos d 3) Reducing flood risk in targ Seleção Direta de Em fase de Imple e alternativas de intervençõe IBRD / 95190 Posterior Direct - National 20,000.00 0.00 2024-07-15 2024-07-25 2024-07-25 2024-09-28 2025-03-27 eted municipalities Consultores mentação s para minimização de cheias nos trechos de rios urbanos d o município de Ibiraçu. BR-AGERH-ES-438058-CS-C DS / Elaboração de estudos d e alternativas de intervençõe 3) Reducing flood risk in targ Seleção Direta de Em fase de Imple IBRD / 95190 Posterior Direct - National 20,000.00 0.00 2024-07-15 2024-07-25 2024-07-25 2024-09-28 2025-03-27 s para minimização de cheias eted municipalities Consultores mentação nos trechos de rios urbanos d o município de João Neiva. BR-SEAMA-463638-CS-INDV 1) Building the Borrower’s c / Contratação de Consultor In Em fase de Imple IBRD / 95190 apacity for water security in Posterior Individual Open - National 37,596.00 0.00 2024-12-02 2024-11-28 2025-01-21 2025-02-11 2025-03-18 2026-03-18 dividual especialista em Hidr mentação a changing climate ologia. AGERH BR-SEAMA-463648-CS-INDV 1) Building the Borrower’s c / Consultor especialista em Em fase de Imple IBRD / 95190 apacity for water security in Posterior Individual Open - National 36,988.00 0.00 2024-12-02 2024-11-28 2025-01-21 2025-02-11 2025-03-18 2026-03-18 Recursos Hídricos para asses mentação a changing climate soramento a UIP AGERH. BR-SEAMA-463667-CS-INDV 2) Demonstrating climate-s / Consultor Individual para Ap mart integrated water securi Em fase de Imple IBRD / 95190 Posterior Individual Open - National 41,264.00 0.00 2024-12-10 2024-11-28 2025-01-29 2025-04-17 2025-02-19 2025-04-23 2025-03-26 2026-03-26 oio ao Gerenciamento de Proj ty risk reduction approaches mentação etos de Reflorestamento. in selected basins BR-AGERH-ES-438049-CS-IN DV / Elaboração de um plano 2) Demonstrating climate-s de monitoramento hidrológic mart integrated water securi Em fase de Imple o e de qualidade de água de IBRD / 95190 Posterior Individual Open - National 40,000.00 0.00 2024-12-02 2024-12-12 2025-02-05 2025-02-26 2025-04-02 2025-09-29 ty risk reduction approaches mentação cursos d’água no Espírito San in selected basins to considerados estratégicos para observar influência de a ções do Programa Refloresta r. Page 3