INDIAN AUDI l AND ACCOUN D PAR TMENT ap 31m , aM 30O017 Ritn -ih dihUplM -t Natiltiiial llydvrology plil( ( I.No a i IN)' Z 1t 2023-24 ý, ,ýj4UI UJIP11 44 f" ' W u Vi Í J ÍU gcTTd1 TF 'National llydrology project (Loan No- 8725-IN) ;F U 2023-24 R WNfIT WTT M M U z Z.:p~ c Cæ WiŠ Wý q- ýU( ÍÌoc1 2. -0Uýý ÍÌil zUI U 3. I u Gadels mi qua~ QUU 3ffaUUrcm 1~IPI? ti Ùi!r : 1. PtkM, TrF e, fÉi ýt41c4, 31f WMN4NT ÍfilMII, (M.I.Division) - Íft Ze 110001 2TlJTa Mr H4 fi 110124 ý4 FM,a ifn im oem 12 ra 4rrna ifaasaiaå P-ivC'DDOs, wit-detils of unreconciled amountsto b -jf-úhed.-- -r--eparee ficon - units whose financial slatenientsa - -~ r-Pep~ethe-onsMidaied accóunts. __ EXECUTIV NGINEER SPMU.NHP W, Ralasth-n I [ - AIPUR Kil RajKaj Ref SignatUre lid 9357226 Digitally signed by Ram Meena Designation . ngineer Date: 2024.07 1:15:41 IST Reason: Approv d Reconciliation of Claimsto Total Applications of Fund- Name of the Project NATIONAL HYDROLOGY PROJECT -- Loan No. 8725-IN- -- - - - Report for the year ended 3 1tMarch 2024 - - - - -- - Amount (Rs.) Schedules Current Yenr Previois Year riject todate Bank Funds climed during the year (A) 127527995.75 107939653.075 360276556.7 Total Applications of funds made during the 279776949.51 217648804.15 year (B) 760034885.8 Less: Ouistanding AC Bills (C) 730090 0 1890190 Ineligible Expenditures (D) 1437881 957576 1245232-, [xpenditures net caimed (E) 0 0 Refund Security deposit(l') 696304 723565 3093 7 Tra,nsfer Sccurity deposit and witihed 21504763 0 amunt in ,u\ ing accounL 215047t63 Oher deduction Deposit(G) 351920 88357 534 5 Rankcharges(H) 0 0 5 55 .2 Toal El r-ible Expenditures Claimed I0 1 21587930615 lii- (BI (C)-Do(E)- (F)- (G) -(H) - 720553i13. World Bank hre . (I) above 5,1%2.-% Pre' , i.'p ~i~J .z'~ . rcjåtE?r~c , ' li Date Date Notes: 1. Total expenditure made durin2 the year (B above) must be the same as Ihe Total Expcnditures shown on the Statenent of Sources and Applications of funds 1i) on the Statement of Sources and A pplieations of Funds). 2. Outstanding AC Bills (C above) reflect funds drawn against AC bills thal have been booked as expenditure but not settiled by ihe end of the year (ie unsettled alvances). RajKaj Ref Signature lid 9357226 Digitally signed by l Ram Meena Designation ngineer Date: 2024.07. 1:15:41 IST Reason: Approv I.- The project should show in Schedule lithe opening balance of unsettled AC billIs. AC bills drawn during the year. AC bills settled during the year, and AC bills unsettled at the end of the year. 3. Expenditure not clainied (E above) may reflcet timing differences for eligible expenditure incurred during the year but claimed aler the year end. Amounts A and J above must be equal. RajKaj Ref Signature lid 9357226 Digitally signed by I Ram Meena Designation . ngineer Date: 2024.07. 1:15:41 IST Reason: Approv