PROCUREMENT PLAN (Textual Part) Project information: Country: Nigeria Project Name: Multi-Sectoral Crisis Recovery Project for North East Nigeria (MCRP) P- Number: P157891 Project Implementation Agency: MCRP PCU (Federal and States) Date of the Procurement Plan: Updated -December 22, 2017. Period covered by this Procurement Plan: From 01/12/2018 – 30/06/2019. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the FGN Public Procurement Act 2007; such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each: Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. Other Relevant Procurement Information. 1. Prior Review Threshold for Goods, Works and Non-Consulting Services: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Prior Review Procurement Method Threshold (US$ Comments equivalent) ICB and LIB (Goods and services other than ≥ 5,000,000 ALL consultancy services) NCB (Goods, IT Systems and Non Consulting Services 100,000 < 5,000,000 NONE (NCB) ICB (Works) ≥ 20,000,000 ALL NCB (Works) 150,000 < 20,000,000 NONE Shopping-Goods ≤ 100,000 NONE Shopping-Works ≤ 150,000 NONE Based on Annual Training, Workshops, Study All Values Work Plans & Tours Budgets 2. Prequalification: Bidders for major works shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines, although it is not expected that there will be need for prequalification in the procurement arrangements for the MCRP. MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 2 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT 3. Proposed Procedures for CDD Components (as per paragraph. 6.52 of the Procurement Regulations): Shall apply. 4. Reference to the Project Implementation Manual: Shall apply. 5. Any Other Special Procurement Arrangements: Not Applicable 6. Procurement Packages (Goods and Works) indicating Bank’s Prior and Post Review. MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 3 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT a. Summary of Procurement of Goods: 1 2 3 4 5 6 Review by Estimated Ref. Packag Bank Commen Description Cost (US$ No. es (Prior / ts Million) Post) Total NCB 12.82 43 Post (Goods) Total RfQ (Goods/Non 0.04 1 Post Consulting Services) Procurement of Goods with Selection Methods and Time Schedule (Please see Annex I). b. Summary of Procurement of Civil Works 1 2 3 4 5 6 Review by Estimated Ref. Bank Commen Description Cost (US$ Packages No. (Prior / ts Million) Post) Total NCB 23.59 64 Post (Works) Total RfQ 2.29 20 Post (Works) Procurement of Civil Works with Selection Methods and Time Schedule (Please see Annex II). c. Summary of Procurement of Non- Consulting Services (TBD) 1 2 3 4 5 6 Review by Estimated Ref. Bank Commen Description Cost (US$ Packages No. (Prior / ts Million) Post) Total NCB 0.175 2 Post MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 4 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT 7. Prior Review Threshold for Consultancies: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Prior Review Selection Method Comments Threshold (USD) Consultant Services-QCBS- International 1. Consulting Services ≥ 300,000 ALL 2. Engineering and Construction ≥ 500,000 Supervision Consultant Services-QCBS < 300,000.00 NONE Consultant Services-CQS < 300,000.00 NONE Consultant Services-lC >300,000.00 ALL Consultant Services-lC <300,000.00 NONE Consultant Services- Single Source All Values ALL Selection Note: All ToRs to be prior review QCBS = Quality and Cost Based Selection SSS = Single Source Selection CQ = Consultant Qualification LCS = Least Cost Selection IC = Individual Consultant 8. Short list comprising entirely of National Consultants: Short list of consultants for services, estimated to cost less than $300,000.00 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. a. Summary of Consultancies 1 2 3 4 5 6 Ref. Description Estimate Package Review by Comment No. d Cost s Bank s (US$ (Prior/Post Million) ) Summary of number of 5.72 7 Prior contracts that will be let under International QCBS Summary of number of 6.45 16 Post contracts that will be let under National QCBS Summary of number of 1.74 30 Post contracts that will be let under CQS Summary of number of 0.35 3 Post contracts that will be let under MOU MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 5 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Summary of number of 0.021 3 Post contracts that will be let under Individual Consultancies MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 6 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Estimated Estimated Prior Number of Amount in Investable or Expected Procureme Pre- USD (Over Amount Post Bid- Description (List of Componen nt Procureme qualificati the Project for 18 Revie Opening Contracts) t/Sector Packages nt Method on Life) months w Date WORKS BORNO Construction Of 18-No Double Classroom Blocks in Ngohi, Biji-Biji, Ngulde, C2/Educati Post Tue-19-Jun- Rumirgo, Chul on 3 NCB No 708,196.72 354,098.36 Review 18 Construction Of 10- No. Double Classroom Block - C2/Educati Post Tue-19-Jun- Bama (Banki Town) on 2 NCB No 393,442.62 314,754.10 Review 18 Reconstruction Of 39- No. Double Classroom Block in C2/Educati Post Damasak, Mobbar on 4 NCB No 575,409.84 71,926.23 Review Tue-24-Jul-18 Construction Of 15- No. Double Classroom Block - C2/Educati Post Gajibo, Logomane (Dikwa) on 2 NCB No 590,163.93 147,540.98 Review Tue-24-Jul-18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 7 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Construction Of 25 No. Double Classroom Block C2/Educati Post GUZAMALA on 2 NCB No 983,606.56 245,901.64 Review Tue-24-Jul-18 Construction Of 20- No. Double Classroom Block - Kukawa Town, Baga, Cross- C2/Educati Post Tue-18-Sep- Kauwa on 2 NCB No 786,885.25 196,721.31 Review 18 Construction Of 10- No. Double Classroom Block - C2/Educati Post Tue-18-Sep- Monguno on 1 NCB No 393,442.62 98,360.66 Review 18 Construction Of 4- No. Double Classroom Block in C2/Educati Post Tue-20-Nov- Ajiri. Mafa on 1 NCB No 157,377.05 39,344.26 Review 18 Renovation Of 20- No. Double Classroom Blockin C2/Educati Post Tue-20-Nov- Damboa Town -Abadam on 2 NCB No 295,081.97 73,770.49 Review 18 Renovation Of 31- No. Double Classroom Block - C2/Educati Post Tue-23-Oct- Bama on 2 NCB No 457,377.05 114,344.26 Review 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 8 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Construction Of 3-No. C2/Educati Post Tue-18-Sep- Educational Office -Kukawa on 1 NCB No 196,721.31 98,360.66 Review 18 Construction Of 2-No. Educational Office - C2/Educati Post Tue-20-Nov- Konduga on 1 NCB No 131,147.54 32,786.89 Review 18 Construction Of 2-No. Educational Office -Hawul C2/Educati Post Tue-23-Oct- Sakwa, Kwajafa on 1 NCB No 131,147.54 32,786.89 Review 18 Construction Of 4-No Vip C2/Educati Post Tue-18-Dec- Toilets -Askira-Uba on 1 RfQ No 59,016.39 47,213.11 Review 18 Construction Of 4-No Vip C2/Educati Post Tue-18-Dec- Toilets -Mafa on 1 RfQ No 59,016.39 47,213.11 Review 18 Construction Of 5-No Vip C2/Educati Post Tue-18-Dec- Toilets -Monguno on 1 RfQ No 73,770.49 59,016.39 Review 18 Renovation Of 1-No. Educational Office - C2/Educati Post Tue-18-Dec- Damboa on 1 RfQ No 18,032.79 4,508.20 Review 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 9 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Renovation Of 1-No. Educational Office and 1- No. Principal's Quarters - Benisheik, Kaga- Benisheik, C2/Educati Post Tue-23-Oct- Kaga on 1 RfQ No 42,622.95 16,803.28 Review 18 Rehabilitation of 66KM C2/Transpo 1,223,144. Prior Tue-27-Feb- Maiduguri to Bama road rt 1 NCB No 9,785,152.68 08 Review 18 Rehabilitation of 1 Ngala C2/Transpo Prior Tue-27-Feb- Bridge rt 1 NCB No 2,295,081.97 483,983.71 Review 18 C2/Transpo Post Tue-27-Feb- Rehabilitation of Biu bridge rt 1 NCB No 902,111.48 73,770.49 Review 18 Construction of galameri- dusuman-zabarmari- C2/Transpo Prior Tue-27-Feb- gongulong feeder road rt 1 NCB No 1,104,625.69 59,016.39 Review 18 RehabilitatIon of 3 General Hospital in ABADAM, ASKIRA UBA, KALA-BALGEe and Rehabilitation of Prior Tue-27-Mar- comprehensive Healthcare C2/Health 3 NCB No 1,555,779.01 986,195.83 Review 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 10 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT center (Civil Works, Solar Borehole, Fence & Security Post) Construction of PHC for 15 2,254,098. Prior Tue-27-Mar- LGAs C2/Health 5 NCB No 3,606,557.38 36 Review 18 Rehabilitation of Borno C2/Educati Post Tue-24-Apr- State Library on 2 NCB No 557,377.05 34,426.23 Review 18 Rehabilitation of Umar Ibn C2/Educati Post Tue-24-Apr- Ibrahim college Bama on 2 NCB No 557,377.05 278,688.52 Review 18 Construction of Solar Powered Boreholes (2Nos) in Umar Ibn Ibrahim college Bama Solar Lighting System to Borno C2/Educati Post Tue-24-Apr- Library on 1 NCB No 196,721.31 98,360.66 Review 18 Rehabilitation of Court Buildings in Bama Gwoza C2/Public Post Tue-22-May- Dikwa Mobbar Buildings 4 RfQ No 393,442.62 49,180.33 Review 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 11 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Rehabilitation of Local Govt Secretariats in Kukawa, Monguno, biu ,Abadam, Kala-Balge, Marte, C2/Public 1,229,508. Post Tue-05-Jun- Magumeri, Guzamala Buildings 8 RfQ No 1,967,213.11 20 Review 18 Rehabilitation of Traditional Rulers' Konduga , Monguno, Kukawa, Nganzai, Baga, Marte, Ngala, Abadam, Guzamala, C2/Public Post Tue-05-Jun- Kwajafa, Kumshe Buildings 6 RfQ No 1,442,622.95 180,327.87 Review 18 Provision of Community Resource Centres in 20 C2/Public Post LGAs Buildings 10 NCB No 2,295,081.97 860,655.74 Review Thu-05-Jul-18 Construction of Handpump Wells in Bama (3) Chibok (5), Biu (5), Mafa(3), Hawul (5), Askira/Uba(5), Konduga(4), Jere(5) Dikwa Post Fri-03-Aug- (3), Gwoza(5), C2/WASH 10 RfQ No 140,983.61 35,245.90 Review 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 12 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Construction of Solar Powered Boreholes in Askira Uba Gwoza(4),Bama(4), Ngala(3), Damboa(3) Jere(4),Kukawa(3), Biu(2),Konduga(3), Gubio(3), Askira/Uba(3), Magumeri(3), Marte(3), Mobbar(3), Monguno(3), Dikwa(2), Mafa(3), Abadam(3), Nganzai(3), Guzamala(3), Kaga(2), Chibok(2), Kala/Balge(3), Hawul(2)(To include 2Nos 5,000lt Plastic water tanks on a 1.5m raised platform , five fetching points/tap gallery, chain link 3,501,639. Post Wed-25-Jul- perimeter fence) C2/WASH 14 NCB No 4,668,852.46 34 Review 18 REHABILITATION OF LOCAL GOVERNMENT LODGES (Marte, Kaga, Chibok, Magumeri, Gwoza, Kala- Balge, Ngala, Guzamala, Abadam, Hawul, C2/Public Post Tue-21-Aug- Askira/Uba, Bama) Buildings 6 NCB No 1,311,475.41 786,885 Review 18 Rehabilitationof Traditional Rulers' Buildings Bama, Konduga, Gwoza ,Kareto, C2/Public Post Damboa , Monguno, Buildings 11 RfQ No 1,442,622.95 180,327.87 Review Thu-26-Jul-18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 13 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Kukawa, Askira-Uba , Dikwa, Baga, Marte REHABILITATION OF MINISTRY BUILDING (Ngala, C2/Public Post Tue-21-Aug- Monguno) Buildings 2 NCB No 276,577 Review 18 CONSTRUCTION OF SANITATION FACILITIES IN 21 LOCAL GOVERNMENT AREAS.ABADAM (6) ASKIRA(6) BAMA(6) BIU(6) CHIBOK(6) DAMBOA(6) DIKWA(6) GUBIO(6) GWOZA(6) JERE(6) KAGA(6) KALA-BALGE(6) KONDUGA(6) KUKAWA(6) MAFA(5) MOBBAR(6) MONGUNO(6) MARTE(6) NGALA(6) NGANZAI(6) Post Wed-19-Sep- MAGUMERI(6) C2/WASH 21 NCB No 781,517 Review 18 REHABILITATION OF EXISTING NON- FUNCTIONAL BOREHOLES ABADAM (1) ASKIRA UBA (2) BIU (2) DIKWA (1) Post Tue-18-Sep- GUBIO (1) GUZAMALA (1) C2/WASH 6 NCB No 258,525 Review 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 14 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT JERE (2) KALA BALGE (1) MAFA (2) MAGUMERI (1) MARTE (2) MOBBAR (1) NGALA (1) NGANZAI (1) Rehabilitation of 8 blocks of Laborataries (Umar Ibn C1/Educati Post Tue-18-Sep- Ibrahim college Bama) on 1 NCB No 262,295 Review 18 ADAMAWA Rehabilitation of Gulak Post Mon-14-May- Water Supply System C2/Water 1 NCB No 179,190.16 134,392.62 Review 18 Rehabilitation of Hong Post Mon-14-May- Water Supply System C2/Water 1 NCB No 116,646.90 87,485.18 Review 18 Rehabilitation of Michika Post Mon-14-May- Water supply system C2/Water 1 NCB No 138,193.44 103,645.08 Review 18 Rehabilitation of Uba Water Post Tue-15-May- Supply system C2/Water 1 NCB No 71,967.21 71,967.21 Review 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 15 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Rehabilitation of exisitng Water Supply sources in Post Tue-15-May- Gombi C2/Water 1 NCB No 30,475.41 30,475.41 Review 18 Construction of Uba New Post Mon-28-May- Water Supply Project C2/Water 1 NCB No 721,222.95 108,183.44 Review 18 Pella New Water Supply Post Mon-28-May- Project C2/Water 1 NCB No 555,289.34 83,293.40 Review 18 Construction of Hong New Post Mon-28-May- Water supply project C2/Water 1 NCB No 1,256,442.62 188,466.39 Review 18 Construction of Michika Post Tue-29-May- New Water supply project C2/Water 1 NCB No 1,189,261.84 178,389.28 Review 18 Construction GOMBI NEW Post Tue-29-May- WATER SUPPLY PROJECT C2/Water 1 NCB No 915,241.80 137,286.27 Review 18 Installation of 12 nos. Solar Boreholes (in secondary schools)- GSS Gombi, GDSS Garkida, GSS Hong, GDSS Pella, GSSS Uba, Post Thu-10-May- GJSS Uba, GDSS Garaha, C2/Water 1 NCB No 377,609.70 75,521.94 Review 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 16 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT GDSS Kwarhi, GDSS Za'ah, GSS Madagli, GSS Shuwa, GSS Gulak, GCSS Shuwa Installation of 37 Nos Solar Boreholes in 37 Health Centers in 7 Local Post Thu-10-May- Governments Areas C2/Water 4 NCB No 1,164,296.59 291,074.15 Review 18 Construction of 295Nos Hand Powered Bore Holes (in 2 primary schools per 35 wards, 35 Markets, 35 Motor parls and 155 Communities across 7 Post Thu-03-May- LGAs) C2/Water 4 NCB No 1,257,377.05 503,483.61 Review 18 Construction of VIP Latrines of 3-Comp (2 Blks Post Tue-14-Aug- in 24 pri sch) C2/WASH 3 RfQ No 212,459.02 79,672.13 Review 18 VIP Latrine of 3-Comp (2 Post Tue-14-Aug- Blks in 26 Markets) C2/WASH 3 RfQ No 230,163.93 92,065.57 Review 18 VIP Latrine of 3-Comp (2 Post Tue-14-Aug- Blks in 26 Motor Parks) C2/WASH 3 RfQ No 230,163.93 92,065.57 Review 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 17 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Rehabilitation of Lokwa C2/Transpo Post Mon-11-Jun- Bridge Mubi rt 1 NCB No 475,143.96 356,357.97 Review 18 Reconstruction of Main Road - Bangshika Road C2/Transpo Prior Mon-11-Jun- 2.5Km rt 1 NCB No 1,019,295.08 127,411.89 Review 18 Rehabilitation of Mubi Bazza Road with a spur to C2/Transpo 1,255,469. Prior Mon-11-Jun- Mayo Bani 45Km rt 1 NCB No 8,369,796.72 51 Review 18 Rehabilitation of PHC, Construction of Perimeter Fence and Staff Quarters (Civil Works, Solar Borehole, Fence & Security C2/Educati Prior Tue-10-Apr- Post) in 7 Communities on 7 NCB No 1,139,130.43 451,779.49 Review 18 Rehabilitation of Cottage Post Tue-10-Apr- Hospital C2/Health 1 NCB No 451,768.85 192,001.76 Review 18 Establishment of Trauma Post Thu-17-May- Center @ general hospital C2/Health 1 RfQ No 65,194.96 65,194.96 Review 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 18 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Renovation of GSS in 10 Towns (Gombi, Hong, Uba, Shuwa, Michika, Bazza, Mubi 1, Maiha, Madagali, C2/Educati Post Mubi North) on 10 NCB No 2,305,292.65 442,327.22 Review Tue-10-Jul-18 Renovation of 25Nos C2/Educati Post Primary School over 7 LGAs on 4 NCB No 865,747.88 324,655.45 Review Tue-10-Jul-18 Rehabilitation of Local Government Secretariat - C2/Public Post Thu-07-Jun- Song Buildings 1 NCB No 288,590.56 144,295.28 Review 18 Rehabilitation of Local Government Secretariat - C2/Public Post Thu-07-Jun- Madagali Buildings 1 NCB No 315,082.89 157,541.44 Review 18 Rehabilitation of District Head's Palace in 5 Communities (Uba, Gella, Gombi, Maiha/Pakka, C2/Public Post Thu-07-Jun- Gulak) Buildings 5 NCB No 422,463.57 158,423.84 Review 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 19 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT YOBE Conversion of Motorised Boreholes (28 Communities in Gulani and Damaturu) into Solar Post Mon-26-Mar- Powered C2/Water 1 NCB No 334,013.66 250,510.24 Review 18 Conversion of existing Motorized powered Borehole without Overhead tank into solar powered (Gujba, Gulani, Yunusari, Damaturu,& Post Mon-26-Mar- Geidam ) C2/Water 1 NCB No 277,532.56 208,149.42 Review 18 Conversion of existing Motorized powered Borehole into solar powered and construction of New Overhead tank (Gujba, Gulani, Yunusari, Post Mon-26-Mar- Damaturu,& Geidam) C2/Water 2 NCB No 542,490.73 406,868.05 Review 18 Drilling of New Solar Powered Boreholes in Gujba, Gulani, Yunusari, Damaturu, Fika, Potiskum, Post Mon-02-Apr- Geidam & Fune C2/Water 2 NCB No 878,917.25 329,593.97 Review 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 20 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Rehabilitation of Solar Powered Boreholes in Gulani, Gujba and Post Mon-02-Apr- Damaturu C2/Water 1 NCB No 244,228.65 183,171.49 Review 18 Construction & Upgrade of Post Wed-24-Oct- 33 nos. PHC Centres C2/Health 5 NCB No 5,386,554.10 538,655.41 Review 18 Reconstruction of Vandalized 3 Nos Post Wed-09-May- Immunization Offices C2/Health 1 RfQ No 68,618.27 68,618.27 Review 18 Renovation of 1No. General Post Mon-03-Sep- Hospital in Buni Yadi C2/Health 1 RfQ No 88,524.59 44,262.30 Review 18 Construction of 1No. Student Hostel each in College of Nursing and Midwifery Damaturu and College of Health Sciences Post Wed-22-Aug- and Technology, Nguru C2/Health 2 NCB No 983,606.56 245,901.64 Review 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 21 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Renovation of Govt Secondary Schools in Goniri,Bara, Bularafa, ,Kananma, Damagum, Buni Yadi, Kukuwa, Gujba and C2/Educati Post Mon-09-Apr- Best Center in Goniri on 5 NCB No 2,001,760.77 800,704.31 Review 18 Renovation of Dokshi C2/Educati Post Mon-09-Apr- Primary school, Gulani on 1 NCB No 168,034.42 67,213.77 Review 18 Rehabilitation of Local Government Office Secretariat in Gujba and C2/Public Post Wed-09-May- Potiskum Buildings 2 NCB No 472,529.40 75,459.62 Review 18 Rehabilitation of Development Offices in Gujba , Gulani, Yunusari & C2/Public Post Wed-09-May- Geidam Buildings 1 RfQ No 62,203.18 15,550.80 Review 18 Provision of Community Resource Centres in all 17 C2/Public Post Wed-23-May- LGAs Buildings 5 NCB No 1,950,819.67 731,557.38 Review 18 Rehabilitation of Audit C2/Public Post Wed-26-Sep- Office Buildings 1 RfQ No 63,078.12 15,769.53 Review 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 22 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Rehabilitation of Zonal C2/Public Post Wed-26-Sep- Statistical Office Buildings 1 RfQ No 50,491.80 25,245.90 Review 18 Rehabilitation ofCultural Buildings (District Head's Palace) in Buni Yadi and C2/Public Post Mon-27-Aug- Damagum Buildings 2 NCB No 446,682.62 111,670.66 Review 18 Rehabilitation of Government Buildings; C2/Public Post Mon-11-Jun- Agency for Mass Literacy Buildings 1 RfQ No 121,445.24 60,722.62 Review 18 Rehabilitation of Government Buildings; C2/Public Post Mon-11-Jun- Town Engineers Office Buildings 1 RfQ No 121,445.24 60,722.62 Review 18 GOODS BORNO Supply of Returnee C1/Transiti Resettlement Kits Bama, onal 2,216,737. Tue-13-Feb- Dikwa, Gwoza, Ngala, Support 4 NCB No 2,216,737.30 30 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 23 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Monguno, Damboa, Gudumbali, Mobbar, Kala Balge) Supply of Agricultural Support kits with Seeds, Fertilizers and Small Work Farm Tools (Bama, Biu, Gwoza, Ngala, Monguno, C1/Transiti Damboa, Askira, Mobbar, onal Tue-13-Feb- Kukawa) Support 3 NCB No 681,729.10 681,729.10 Post 18 Supply of Small Animals (Bama, Mafa, Gwoza, Ngala, Monguno, Damboa, C1/Transiti Chibok, Nganzai, Kala onal Tue-20-Feb- Balge) Support 3 NCB No 788,935.25 788,935.25 Post 18 Supply of Non-agricultural Livelihood Kits (Bama, Dikwa, Gwoza, Ngala, C1/Transiti Monguno, Damboa, Chibok, onal Tue-13-Feb- Mobbar, Hawul Support 2 NCB No 227,377.05 227,377.05 Post 18 C1/Transiti Supply of Skills Acquisition onal Tue-20-Feb- Start up Kits Support 3 NCB No 737,704.92 387,295.08 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 24 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Supply of solar electrification to 3 GENERAL HOSPITALS in ABADAM, GWOZA and KALA-BALGE and five Comprehensive Health Centre in Abadam, 2 in Gwoza, Kala-Balge, Askira - Tue-01-Jan- Uba C2/Health 3 NCB No 670,553.40 516,770.59 Post 19 Supply of Medical Equipment For 3General Hospitals in ABADAM, ASKIRA UBA, and KALA- Tue-15-Jan- BALGE C2/Health 3 NCB No 590,163.93 73,770.49 Post 19 Supply of Essential Drugs/Medical Consumables For 3 General Hospitals in HAWUL, Tue-05-Mar- MOBBAR AND DAMBOA C2/Health 3 NCB No 472,131.15 59,016.39 Post 19 Supply of Medical Equipment for Comprehensive Health Wed-09-Jan- Centers (Gwoza- Izge) C2/Health 1 NCB No 245,901.64 30,737.70 Post 19 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 25 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Supply of Essential Drugs/Medical Consumables for Comprehensive Health Tue-05-Feb- Center (Gwoza-izge) C2/Health 1 NCB No 236,065.57 29,508.20 Post 19 Supply of Medical Equipment to 15 PHCs to (Ngala, Nganzai Kukawa, Biu, Konduga, Gubio, Askira/Uba, Guzamala, Bama, Jere, Marte, Mobbar, Dikwa, Tue-15-Jan- Mafa, Abadam) C2/Health 2 NCB No 983,606.56 122,950.82 Post 19 Supply of Essential Drugs to 15 PHCs (Ngala, Nganzai Kukawa, Biu, Konduga, Gubio, Askira/Uba, Guzamala, Bama, Jere, Marte, Mobbar, Dikwa, Tue-05-Feb- Mafa, Abadam) C2/Health 2 NCB No 786,885.25 98,360.66 Post 19 Supply and Installation of Solar Inverters in 15 PHCs in (Ngala, Nganzai Kukawa, Biu, Konduga, Gubio, Askira/Uba, Guzamala, Bama, Jere, Marte, Mobbar, Tue-06-Mar- Dikwa, Mafa, Abadam) C2/Health 1 NCB No 262,295.08 65,573.77 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 26 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Furniture for Library/ Offices in the Borno State Library and Furniture for 15 blocks of classrooms in Umar Ibn ibrahim college C2/Educati Tue-19-Mar- Bama on 2 NCB No 491,803.28 245,901.64 Post 19 Books and other learning Materials including elibrary C2/Educati Tue-19-Mar- in the Borno State library on 1 NCB No 262,295.08 131,147.54 Post 19 Suppy of Computers and other accessories to the Borno State Library , Maiduguri and Umar Ibn C2/Educati Tue-19-Mar- ibrahim college Bama on 2 RfQ No 81,967.21 40,983.61 Post 19 Supply of Medical Equipment TO 3 Comprehensive Health centers IN HAWUL, MOBBAR AND DAMBOA Tue-06-Mar- (Kwajafa, Kareto, Damboa) C2/Health 1 NCB No 196,721.31 49,180.33 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 27 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Installation of solar inverters for PHC Gwoza( Tue-06-Mar- Izge) C2/Health 1 NCB No 13,114.75 13,114.75 Post 18 ADAMAWA C1/Transiti Supply of Returnee onal Mon-19-Mar- Resettlement Kits Support 2 NCB No 490,780.33 490,780.33 Post 18 Supply of Agricultural Support kits with Seeds, C1/Transiti Fertilizers and Small Work onal 1,496,508. Mon-19-Mar- Farm Tools Support 7 NCB No 1,496,508.20 20 Prior 18 C1/Transiti onal Thu-19-Apr- Supply of Small Animals Support 1 NCB No 182,950.82 182,950.82 Post 18 C1/Transiti Supply of Non-agricultural onal Mon-19-Mar- Livelihood Kits Support 1 NCB No 213,442.62 213,442.62 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 28 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT C1/Transiti Start up kits for quick to onal Mon-19-Mar- market trading Support 1 NCB No 114,754.10 114,754.10 Post 18 Housing Refurbishment Returnee Packs for Voluntary Returnees across C1/Transiti the 7 LGAs being onal Thu-14-Jun- rehabilitated. Support 2 NCB No 390,163.93 331,639.34 Post 18 Supply of Medical Equipment to PHCs in 7 communities and Cottage Hospital in Gulak C2/Health 2 NCB No 344,262.30 43,032.79 Post Thu-19-Jul-18 Supply of Essential Drugs/Medical Consumable to PHCs in 7 Communities and Cottage Hospital in Thu-01-Nov- Gulak C2/Health 2 NCB No 452,459.02 108,196.72 Post 18 Installation of Solar Inverters in 7 Rehabilitated PHCs, Cottage Hospital in Mon-06-Aug- Gulak C2/Health 3 NCB No 268,861.16 18,852.46 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 29 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Equipping of Trauma Center @ Michika General Mon-06-Aug- hospital C2/Health 1 NCB No 214,142.46 80,303.42 Post 18 Supply of Furniture to C2/Educati Thu-29-Mar- Primary Schools in 7 LGAs on 1 NCB No 245,901.64 30,737.70 Post 18 Supply of Books and Teaching/Learning Materials to Primary C2/Educati Thu-29-Mar- Schools in 7 LGAs on 1 NCB No 327,868.85 122,950.82 Post 18 Establishment of spare part supply chain/buffer Mon-16-Apr- stock for Water Facilities C2/WASH 1 NCB No 114,754.10 86,065.57 Post 18 Train the Trainer/User Workshops (i.e. 2 per LGA) for VLOM (Village Level Operation and Maintenance) WASHCOMS, (WASH Committees at LGA Level, WASH Units @ LGAs, VHPs (Voluntary Hygiene Promoters) State/LGA Govt Tue-24-Apr- Officials. C2/WASH 1 NCB No 72,131.15 54,098.36 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 30 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT YOBE C1/Transiti Supply of Non Food Items onal Wed-21-Mar- (NFIs) Kits Support 3 NCB No 559,213.11 559,213.11 Post 18 C1/Transiti Supply of Agricultural kits onal 1,048,940. Wed-21-Mar- with seeds, oil, small tools Support 3 NCB No 1,048,940.98 98 Post 18 C1/Transiti onal Mon-23-Apr- Supply of Small Animals Support 3 NCB No 688,524.59 688,524.59 Post 18 C1/Transiti Non-agricultural Livelihood onal Mon-26-Mar- kits Support 2 NCB No 352,295.08 352,295.08 Post 18 C1/Transiti Supply of Skills Acquisition onal Wed-21-Mar- Start up Kits Support 3 NCB No 786,885.25 550,819.67 Post 18 Procure and distribute Plumpy Nuts for Wed-25-Apr- malnourished children in C2/Health 1 NCB No 215,438.65 32,315.80 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 31 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Gujba, Geidam and Yunusari LGAs Equipping of Trauma Mon-12-Feb- Center C2/Health 1 NCB No 214,147.54 53,536.89 Post 18 Supply of Students Textbooks and Teachers' C2/Educati Mon-17-Sep- Guides on 1 NCB No 284,062.30 71,015.57 Post 18 Supply of Laboratory Equipment Physics. C2/Educati Mon-17-Sep- Chemistry & Biology on 1 NCB No 213,114.75 53,278.69 Post 18 C2/Educati Mon-17-Sep- Supply of School Furniture on 3 NCB No 804,885.25 201,221.31 Post 18 CONSULTING SERVICES BORNO Skills Acquisition Training C1/Transiti (3Nos Consultancies across onal Mon-09-Jul- 10 LGAs) Support 3 QCBS No 491,803.28 258,196.72 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 32 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Specialized psycho-social support responding to C1/Commu needs (3Nos Consultancies nity Wed-28-Mar- across 10 LGAs) Resilience 3 QCBS No 826,229.51 619,672.13 Post 18 Consultancy for the Mobilisation and Organisation of Civic Education with Cultural and Recreational activities at Community Level with programs that respond to needs as prioritized by community based diagnosis (3Nos C1/Commu Consultancies across 10 nity Wed-11-Apr- LGAs) Resilience 3 QCBS No 442,622.95 265,573.77 Post 18 Consultancy for Sensitization, Community Mobilization and formation of peace groups within 7 Communities(establishmen t of community platforms to discuss community needs, grievances; and C1/Commu redress mechanisms. (1No nity Mon-30-Apr- Consultancy) Resilience 1 QCBS No 531,147.54 318,688.52 Prior 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 33 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Consultancy for Post- C1/Commu Conflict Transitional Justice nity Mon-21-May- and Accountability Resilience 1 QCBS No 147,540.98 88,524.59 Post 18 Statewide sponsorship for Radio Programming for Peacebuilding Campaign and Content for dissemination (focusing on deradicalisation, grievance C1/Commu redress and peacebuilding nity Mon-04-Jun- outreach themes) Resilience 1 CQS No 475,409.84 178,278.69 Prior 18 Consultancy for Educational campaigns for the prevention of mine and unexploded ordinance accidents /Mobilisation and Sensitization Campaign on Mine Action (Unexploded C1/Commu Ordnances) (1No nity Mon-04-Jun- Consultancy) Resilience 1 QCBS No 442,622.95 354,098.36 Prior 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 34 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Consultancy for Leadership Accountability and Transparency Training Programme (NELATTP) Targeting 20 LGA Staff and State Ministry Personal per LGA - Development of a transparency and accountability Local Governance Model through community participation C1/Commu (social accountability nity Fri-25-May- mechanisms) Resilience 1 CQS No 88,524.59 55,327.87 Post 18 Consultancy for Registration, Mapping and C1/Strengt Profiling of all local hening government structures and Local existing capacities State Governanc Fri-25-May- Wide e 1 CQS No 49,180.33 30,737.70 Post 18 Consultancy to provide C1/Strengt Capacity building of LG hening Officers for economic Local planning and policy Governanc Fri-25-May- development e CQS No 88,524.59 55,327.87 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 35 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT C1/Strengt hening Capacity building for LG Local officials on programme Governanc Fri-25-May- design and implementation e CQS No 88,524.59 55,327.87 Post 18 Capacity building of LG C1/Strengt Officers for local hening governments on budget Local planning and execution, Governanc Fri-25-May- monitoring and reporting e 1 CQS No 88,524.59 55,327.87 Post 18 Capacity building of LG Officers for strategic communications C1/Strengt (Legislative Advocacy, hening Media relations, Local Stakeholder Management Governanc Fri-25-May- etc). e CQS No 88,524.59 55,327.87 Post 18 Capacity Building for 10 Local Government C1/Strengt Emergency Management hening Responders in Displaced Local and Transitional Local Governanc Fri-25-May- Government Officials e 1 CQS No 203,278.69 152,459.02 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 36 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Sensitization, training (especially on Identification, Documentation, Tracing and Reunification and follow up) and coaching for state and non-state partners on case management of UASC C1/Program (Unaccompanied and Support to Fri-25-May- Separated Children) UASC 1 MOU No 73,770.49 59,016.39 Post 18 Training for officials of relevant State MDAs on C1/Program effective approaches to Support to Thu-28-Jun- UASC UASC 1 IC No 16,393.44 13,114.75 Post 18 Teacher Training and C1/Educati Fri-25-May- Recertification on 1 MOU No 442,622.95 77,459.02 Post 18 Training of Community Health Workers (CHeWs, VHWs, Midwives) to Staff Targeted Health Facilities (3Nos consultancies across the state. Amount Inclusive of Workshop and per diem Mon-29-Apr- payments) C1/Health 3 QCBS No 796,721.31 298,770.49 Post 19 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 37 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Sensitization and Mobilisation for Health (Outreach Programs) in 27 LGAs (Over 10 Fri-25-May- engagements) C1/Health 10 CQS No 708,196.72 265,573.77 Post 18 Identification and training of Village Levels Mechanics and Local Area Mechanics on Operation and Maintenance of existing Hand Pump and Solar powered Borehole for effective utilization and Fri-25-May- management. C2/WASH 1 CQS No 98,360.66 73,770.49 Post 18 ADAMAWA Refresher Training of Existing Extension Workers C1/Transiti to support Livelihoods onal Thu-10-May- Projects Support 1 CQS No 65,573.77 65,573.77 Post 18 Training of affected farmers to apply inputs and access targeted C1/Transiti agricultural value chains onal Thu-21-Jun- and agribusiness skills Support 1 CQS No 167,216.39 167,216.39 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 38 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Establishment of Returnees Resettlement Registry at each LGA for Sensitization, Mobilisation and Logistics support for Safe and C1/Transiti Voluntary returns to 7 onal Thu-24-May- LGAs being rehabilitated Support 1 CQS No 61,565.57 49,252.46 Post 18 Consultancy to provide C1/Transiti Training for Bio Data onal Thu-10-May- Registration Support Support 1 IC No 1,377.05 1,101.64 Post 18 Consultancy for Sensitization, Community Mobilization and formation of peace groups within 7 Communities(establishmen t of community platforms to discuss community C1/Commu needs, grievances; and nity Mon-04-Jun- redress mechanisms Resilience 1 QCBS No 344,262.30 206,557.38 Prior 18 Diagnosis of community- specific reconciliation, peacebuilding and social C1/Commu cohesion needs and nity Thu-03-May- consequent development Resilience 2 QCBS No 344,262.30 206,557.38 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 39 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT of Civil Education Programs using Cultural and Recreational activities at Community Level (2Nos Consultancies) Provision of specialized psycho-social assessment and support responding to needs through group support, recreational, customary and socializing activities, referrals etc C1/Commu (3Nos Consultancies across nity Mon-11-Jun- the affected areas) Resilience 3 QCBS No 642,622.95 481,967.21 Post 18 Sensitization and Mobilisation Programs for Awareness against Stigmatization of Woman and Children associated C1/Commu with armed groups. (1No nity Mon-04-Jun- Consultancy) Resilience 1 QCBS No 413,114.75 247,868.85 Prior 18 Consultancy for Mediation and Alternate Dispute Resolution Capacity C1/Commu Building within the nity Mon-18-Jun- Community Leadership and Resilience 3 QCBS No 425,960.66 255,576.39 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 40 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Governance Structures (3Nos Consultancies acrossthe state) C1/Citizen- Consultancy for Leadership Governmen Accountability and t Transparency Training Relationshi Thu-10-May- Programme p Building 1 CQS No 72,131.15 45,081.97 Post 18 Registration, Mapping and C1/Strengt Profiling of all local hening government structures and Local existing capacities State Governanc Mon-28-May- Wide e 1 CQS No 39,344.26 24,590.16 Post 18 C1/Strengt Capacity building of LG hening Officers for economic Local planning and policy Governanc Mon-28-May- development e 1 CQS No 72,131.15 45,081.97 Post 18 C1/Strengt hening Capacity building for Local programme design and Governanc Mon-28-May- implementation e 1 CQS No 72,131.15 45,081.97 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 41 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Capacity building of LG C1/Strengt Officers for local hening governments on budget Local planning and execution, Governanc Mon-28-May- monitoring and reporting e 1 CQS No 72,131.15 45,081.97 Post 18 Capacity building of LG Officers for strategic communications C1/Strengt (Legislative Advocacy, hening Media relations, Local Stakeholder Management Governanc Thu-21-Jun- etc). e 1 CQS No 72,131.15 45,081.97 Post 18 Hygiene Promotion Mon-17-Sep- Sensitization/Mobilization C2/WASH 1 IC No 9,180.33 6,885.25 Post 18 Hygiene Promotion Mon-12-Nov- Campaign C2/WASH 1 CQS No 85,677.59 64,258.20 Post 18 Training of Community Health Workers (CHeWs) to Staff Targeted Health Thu-13-Dec- Facilities C2/Health 1 CQS No 68,852.46 55,081.97 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 42 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Sensitization and Mobilisation for Health Mon-17-Sep- (Outreach Programs) C2/Health 1 CQS No 183,606.56 146,885.25 Post 18 Mobilization and Sensitization for Children C2/Educati Thu-31-May- Education on 1 CQS No 206,557.38 206,557.38 Post 18 Teacher Training and Recertification ( Primary C2/Educati Thu-13-Dec- and Secondary Schools ) on 1 CQS No 360,655.74 360,656.74 Prior 18 YOBE Skills Acquisition Training C1/Transiti 3 Nos Consultancies across onal Wed-25-Apr- 8 LGAs) Support 3 QCBS No 524,590.16 367,213.11 Post 18 Consultancy for Sensitization, Community Mobilization and formation of peace groups within 15 C1/Peace Wed-23-May- Communities Building 1 QCBS No 491,803.28 319,672.13 Prior 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 43 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Diagnosis of community- specific reconciliation, peacebuilding and social cohesion needs and consequentt development of Civil Education Programs using Cultural and Recreational activities at C1/Peace Mon-04-Jun- Community Level Building 1 CQS No 49,180.33 31,967.21 Post 18 Consultancy for Mediation and Alternate Dispute Resolution Capacity Building within the Community Leadership and C1/Peace Mon-04-Jun- Governance Structures Building 1 CQS No 177,049.18 115,081.97 Post 18 Radio programs on mine awareness, dispute resolution in Hausa, Kanuri C1/Peace Wed-25-Jul- and Fulfulde Building 1 CQS No 280,719.92 105,269.97 Post 18 Provision of specialized psycho-social assessment and support responding to needs (3 Nos Consultancies C1/Peace Wed-20-Jun- across 8 LGAs) Building 3 QCBS No 625,822.95 438,076.07 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 44 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Mapping and profiling of local government C1/Strengt structures and hening communities in places of Local both displacement and Governanc Thu-28-Jun- origin e 1 CQS No 39,344.26 39,344.26 Post 18 Establishment of C1/Strengt community platforms to hening discuss community needs, Local grievances; and building a Governanc Wed-06-Jun- bottom-up planning model e 1 CQS No 74,948.93 59,959.14 Post 18 Development of a transparency and accountability model C1/Strengt through community hening participation (social Local accountability Governanc Wed-06-Jun- mechanisms) e 1 CQS No 47,377.05 37,901.64 Post 18 C1/Strengt Capacity building of LG hening Officers for economic Local planning and policy Governanc Thu-28-Jun- development e 1 CQS No 55,737.70 44,590.16 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 45 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT C1/Strengt hening Capacity building for Local programme design and Governanc Thu-28-Jun- implementation e 1 CQS No 55,737.70 44,590.16 Post 18 Capacity building of LG C1/Strengt Officers for local hening governments on budget Local planning and execution, Governanc Thu-28-Jun- monitoring and reporting e 1 CQS No 55,737.70 44,590.16 Post 18 Capacity building of LG Officers for strategic communications C1/Strengt (Legislative Advocacy, hening Media relations, Local Stakeholder Management Governanc etc). e 1 CQS No 55,737.70 44,590.16 Post Thu-26-Jul-18 Sensitization, training (especially on Identification, Documentation, Tracing and Reunification and follow up) and coaching for state and non-state C1/Program partners on case Support on Thu-07-Jun- management of UASC UASC 1 CQS No 52,459.02 41,967.21 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 46 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Training for officials of C1/Program relevant MDAs on effective Support on Thu-28-Jun- approaches to UASC UASC 1 CQS No 8,196.72 6,557.38 Post 18 Menstrual Hygiene Management to support Women and Girls of productive ages to effectively maintain their Thu-17-May- menstrual hygiene C2/WASH 1 QCBS No 110,163.93 41,311.48 Post 18 Community Led Total Sanitation (CLTS) Implementation in Thu-31-May- communities C2/WASH 1 QCBS No 220,327.87 82,622.95 Post 18 Community Management training of entire Communities in the 8 proposed LGAs to effectively manage their Water, Sanitation and Mon-18-Jun- Hygiene Facilities C2/WASH 3 QCBS No 293,770.49 110,163.93 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 47 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Identification and training of Village Levels Mechanics and Local Area Mechanics on Operation and Maintenance of existing Hand Pump and Solar powered Borehole for effective utilization and Thu-17-May- management. C2/WASH 1 CQS No 98,360.66 61,475.41 Post 18 Water Safety Plan implementation in the entire Communities of the Mon-16-Jul- four LGAs. C2/WASH 1 CQS No 112,459.02 84,344.26 Post 18 Integrated Outreach Services (Up to 5 activities Thu-17-May- envisaged) C2/Health 5 QCBS No 344,262.30 129,098.36 Post 18 Training of Community Health Workers (CHeWs, VHWs, Midwives) to Staff Thu-15-Nov- Targeted Health Facilities C2/Health 1 QCBS No 501,639.34 376,229.51 Prior 18 Teacher Training and C2/Educati Mon-26-Nov- Recertification in all LGAs on 1 MOU No 278,688.52 209,016.39 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 48 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT PCNI NERSP PMC CELL Project Wide Project C3/Technic Management Consultancy al 2,000,000. Wed-11-Apr- Firm Assistance 1 QCBS No 3,000,000.00 00 Prior 18 Consultancy services for immediate- and medium- term implementation capacity building (4 C3/Technic separate Consultancies al Thu-03-May- Envisaged) Assistance 4 CQS No 536,393.44 268,196.72 Prior 18 Consultancy Services for C3/Technic Monitoring and Evaluation al Baseline Study Assistance 1 QCBS No 177,049.18 177,049.18 Post Fri-27-Apr-18 Consultancy services for setting up citizen engagement and third C3/Technic party monitoring al mechanisms Assistance 1 CQS No 177,049.00 59,016.33 Post Fri-06-Apr-18 Consultancy Services for C3/Technic Environmental Impact al Assessment Assistance 1 QCBS No 39,344.26 39,344.26 Post Fri-13-Apr-18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 49 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT NON- CONSULTING SERVICES ADAMAWA Door to Door Collection of Thu-24-May- Solid waste in 7 LGAs C2/WASH 1 NCB No 236,065.57 88,524.59 Post 18 Disposal of Waste from Door to Door Collection in Tue-13-Feb- 7 LGAs C2/WASH 1 NCB No 229,508.20 86,065.57 Post 18 OPERATIONAL COSTS PCNI NERSP PMC CELL PMC Software, Intranet and C3/Operati Tools onal Costs 3 RfQ No 159,240.16 159,240.16 Post Fri-27-Apr-18 Video Conferencing C3/Operati Thu-25-Jan- Equipment onal Costs 1 RfQ No 131,147.54 131,147.54 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 50 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT C3/Operati Tue-27-Mar- Office Vehicles onal Costs 1 RfQ No 344,265.00 344,265.00 Post 18 BORNO STATE Procurement of 12 laptop computers, 12 laserjet printers, 4 photocopiers, 3 desktops, 15 desktops for work stations, 2 deskjet printers, HP Scanjet C3/Operati scanner onal Costs 1 RfQ No 159,240.16 159,240.16 Post Fri-27-Apr-18 Procurement of video conference equipment and C3/Operati internet connectivity onal Costs 1 RfQ No 65,574.00 65,574.00 Post Fri-27-Apr-18 Procurement of Office C3/Operati Tue-27-Mar- Furniture onal Costs 1 NCB No 32,786.89 32,786.89 Post 18 Procurement of 1 Video C3/Operati Wed-28-Mar- Camera, 2 DLSR Cameras, onal Costs 1 RfQ No 7,000.00 7,000.00 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 51 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Procurement of 100KVA sound proof Generator, C3/Operati Sun-20-May- 10KVA Inverter System onal Costs 1 RfQ No 42,623.00 42,623.00 Post 18 Procurement of Office Vehicles - 2 Toyota Prado Jeep, 3 Toyota Hilux, 1 C3/Operati Wed-14-Mar- Toyota Corolla onal Costs 1 NCB No 448,525.00 448,525.00 Post 18 ADAMAWA STATE Procurement of computers, printers and other C3/Operati Wed-28-Mar- accessories onal Costs 1 RfQ No 24,131.15 24,131.15 Post 18 Procurement of video conference equipment and C3/Operati Wed-28-Mar- internet connectivity onal Costs 1 RfQ No 65,574.00 65,574.00 Post 18 Procurement of Office C3/Operati Tue-27-Mar- Furniture onal Costs 1 NCB No 32,786.89 32,786.89 Post 18 Procurement of 1 Video C3/Operati Wed-28-Mar- Camera, 2 DLSR Cameras, onal Costs 1 RfQ No 20,327.87 20,327.87 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 52 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Procurement of 100KVA sound proof Generator, C3/Operati Mon-26-Mar- 10KVA Inverter System onal Costs 1 RfQ No 42,623.00 42,623.00 Post 18 Procurement of Office Vehicles - 2 Toyota Prado Jeep, 3 Toyota Hilux, 1 C3/Operati Tue-27-Mar- Toyota Corolla onal Costs 1 RfQ No 518,033.00 518,033.00 Post 18 YOBE STATE Procurement of computers, printers and other C3/Operati Wed-28-Mar- accessories onal Costs 1 RfQ No 24,131.15 24,131.15 Post 18 Procurement of video conference equipment and C3/Operati Wed-28-Mar- internet connectivity onal Costs 1 RfQ No 65,574.00 65,574.00 Post 18 Procurement of Office C3/Operati Tue-27-Mar- Furniture onal Costs 1 NCB No 32,786.89 32,786.89 Post 18 Procurement of 1 Video C3/Operati Wed-28-Mar- Camera, 2 DLSR Cameras, onal Costs 1 RfQ No 20,327.87 20,327.87 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 53 THE NORTH EAST MULTI-SECTORAL CRISIS RECOVERY PROJECT Procurement of 100KVA sound proof Generator, C3/Operati Mon-26-Mar- 10KVA Inverter System onal Costs 1 RfQ No 42,623.00 42,623.00 Post 18 Procurement of Office C3/Operati Tue-27-Mar- Vehicles onal Costs 1 RfQ No 468,852.46 468,852.46 Post 18 MCRP 18 MONTHS PROCUREMENT PLAN 2016 - 2018 54 PROCUREMENT Nigeria : Multi-Sectoral Crisis Recovery Project for North Eastern Nigeria PLAN General Information Country: Nigeria 2018-06-06 Bank’s Approval Date of the Original Procurement Plan: Revised Plan Date(s): (comma delineated, leave blank 2025-03-21 if none) Project ID: P157891 GPN Date: Project Name: Multi-Sectoral Crisis Recovery Project for North Eastern Nigeria Loan / Credit No: IDA / 59880, IDA / 66490 Adamawa MCRP Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Comple Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes tion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned NG-ADAMAWA MCRP-60544- Infrastructure Rehabilitation Single Stage - One E 2019-01-2 CW-RFB / Rehabilitation of Gu IDA / 59880 and Service Delivery Restora Post Request for Bids Open - National 179,190.16 0.00 Canceled 2018-04-06 2018-04-11 2018-05-23 2018-06-22 2018-07-27 nvelope 3 lak Water Supply System tion & Improvement NG-ADAMAWA MCRP-60190- Infrastructure Rehabilitation Single Stage - One E 2019-01-2 CW-RFB / Rehabilitation of Ho IDA / 59880 and Service Delivery Restora Post Request for Bids Open - National 116,646.90 0.00 Canceled 2018-04-06 2018-04-11 2018-05-23 2018-06-22 2018-07-27 nvelope 3 ng Water Supply System tion & Improvement NG-ADAMAWA MCRP-60574- Infrastructure Rehabilitation Single Stage - One E 2019-01-2 CW-RFB / Rehabilitation of Mi IDA / 59880 and Service Delivery Restora Post Request for Bids Open - National 138,193.44 0.00 Canceled 2018-04-06 2018-04-11 2018-05-23 2018-06-22 2018-07-27 nvelope 3 chika Water supply system tion & Improvement NG-ADAMAWA MCRP-60628- Infrastructure Rehabilitation Single Stage - One E 2019-01-2 CW-RFB / Rehabilitation of Ub IDA / 59880 and Service Delivery Restora Post Request for Bids Open - National 71,967.21 0.00 Canceled 2018-04-06 2018-04-11 2018-05-23 2018-06-22 2018-07-27 nvelope 3 a Water Supply system tion & Improvement NG-ADAMAWA MCRP-60942- Infrastructure Rehabilitation Single Stage - One E 2019-01-2 CW-RFB / Rehabilitation of e IDA / 59880 and Service Delivery Restora Post Request for Bids Open - National 30,475.41 0.00 Canceled 2018-04-06 2018-04-11 2018-05-23 2018-06-22 2018-07-27 nvelope 3 xisitng Water Supply sources tion & Improvement in Gombi NG-ADAMAWA MCRP-60952- Infrastructure Rehabilitation Request for Quota Single Stage - One E 2019-03-0 CW-RFQ / Construction of VIP IDA / 59880 and Service Delivery Restora Post Open - National 212,459.02 0.00 Canceled 2018-07-11 2018-09-05 tions nvelope 4 Latrines of 3-Comp (2 Blks in tion & Improvement 24 pri sch) NG-ADAMAWA MCRP-60083- Infrastructure Rehabilitation Request for Quota Single Stage - One E 2019-03-0 CW-RFQ / VIP Latrine of 3-Co IDA / 59880 and Service Delivery Restora Post Open - National 230,163.93 0.00 Canceled 2018-07-11 2018-09-05 tions nvelope 4 mp (2 Blks in 26 Markets) tion & Improvement NG-ADAMAWA MCRP-60505- Infrastructure Rehabilitation Request for Quota Single Stage - One E 2019-03-0 CW-RFQ / VIP Latrine of 3-Co IDA / 59880 and Service Delivery Restora Post Open - National 230,163.93 0.00 Canceled 2018-07-11 2018-09-05 tions nvelope 4 mp (2 Blks in 26 Motor Parks) tion & Improvement NG-ADAMAWA MCRP-60940- Infrastructure Rehabilitation CW-RFB / Rehabilitation of Mu Single Stage - One E 2019-02-2 IDA / 59880 and Service Delivery Restora Prior Request for Bids Open - National 8,369,796.72 0.00 Canceled 2018-05-04 2018-05-09 2018-06-20 2018-07-20 2018-08-24 bi Bazza Road with a spur to nvelope 0 tion & Improvement Mayo Bani 45Km NG-ADAMAWA MCRP-60315- Infrastructure Rehabilitation Single Stage - One E 2019-02-1 CW-RFB / Rehabilitation of Lo IDA / 59880 and Service Delivery Restora Post Request for Bids Open - National 315,082.89 0.00 Canceled 2018-04-30 2018-05-05 2018-06-16 2018-07-16 2018-08-20 nvelope 6 cal Government Secretariat - tion & Improvement Madagali NG-ADAMAWA MCRP-69807- Infrastructure Rehabilitation Request for Quota Single Stage - One E 2019-03-2 CW-RFQ / Upgrade and Expan IDA / 59880 and Service Delivery Restora Post Limited 721,222.95 0.00 Terminated 2018-08-05 2019-06-27 2018-09-30 2019-09-05 tions nvelope 9 sion of Uba Water Supply Proj tion & Improvement ect NG-ADAMAWA MCRP-69803- Infrastructure Rehabilitation Request for Quota Single Stage - One E 2019-03-2 CW-RFQ / Upgrade and Expan IDA / 59880 and Service Delivery Restora Post Limited 555,289.34 476,751.54 Completed 2018-08-01 2019-06-27 2018-09-26 2019-09-13 tions nvelope 5 sion of Pella Water Supply Pr tion & Improvement oject NG-ADAMAWA MCRP-69714- Infrastructure Rehabilitation Request for Quota Single Stage - One E 1,063,388.5 2019-02-2 CW-RFQ / Upgrade and Expan IDA / 59880 and Service Delivery Restora Post Open - National 1,256,442.62 Completed 2018-07-25 2018-08-29 2019-09-13 tions nvelope 0 5 sion of Hong Water supply pr tion & Improvement oject NG-ADAMAWA MCRP-69805- Infrastructure Rehabilitation Request for Quota Single Stage - One E Under Imple 2019-03-2 CW-RFQ / Upgrade and Expan IDA / 59880 and Service Delivery Restora Post Limited 915,241.80 0.00 2018-08-01 2019-06-27 2018-09-26 tions nvelope mentation 5 sion of Gombi Water Supply P tion & Improvement roject NG-ADAMAWA MCRP-60578- Infrastructure Rehabilitation Single Stage - One E 2019-02-2 CW-RFB / Rehabilitation of Lo IDA / 59880 and Service Delivery Restora Post Request for Bids Open - National 475,143.96 525,084.68 Completed 2018-05-04 2020-02-05 2018-05-09 2020-02-18 2018-06-20 2020-03-17 2018-07-20 2020-08-06 2018-08-24 2020-09-08 nvelope 0 kwa Bridge Mubi tion & Improvement NG-ADAMAWA MCRP-69818- CW-RFQ / Rehabilitation of PH Infrastructure Rehabilitation Request for Quota Single Stage - One E 2019-03-1 C, Construction of Perimeter IDA / 59880 and Service Delivery Restora Post Limited 935,802.00 806,687.09 Completed 2018-08-21 2019-11-08 2018-10-05 2020-07-18 tions nvelope 4 Fence and Staff Quarters (Civ tion & Improvement il Works, Fence & Security Po st) in 7 Communities NG-ADAMAWA MCRP-69810- CW-RFQ / Rehabilitation of Di Infrastructure Rehabilitation Request for Quota Single Stage - One E 2018-12-2 strict Head's Palace and Offic IDA / 59880 and Service Delivery Restora Post Limited 422,463.57 319,349.34 Completed 2018-08-05 2020-06-30 2018-09-30 2020-09-16 tions nvelope 9 es in 5 Communities (Uba, Ge tion & Improvement lla, Gombi, Maiha/Pakka, Gula k) NG-ADAMAWA MCRP-69962- CW-RFQ / Remodeling and up Technical Assistance and Pro Request for Quota Single Stage - One E Under Imple 2018-08-0 IDA / 59880 Post Limited 32,840.72 0.00 2018-07-19 2018-07-26 grade of rented office facility ject Management Support tions nvelope mentation 9 to meet the requirements of t he PCU. NG-ADAMAWA MCRP-74570- Infrastructure Rehabilitation Request for Quota Single Stage - One E 2019-01-2 CW-RFQ / Rehabilitation of Lo IDA / 59880 and Service Delivery Restora Post Open - National 288,590.56 268,328.76 Completed 2018-08-20 2018-10-18 2020-02-08 tions nvelope 6 cal Government Secretariat - tion & Improvement Song NG-ADAMAWA MCRP-59963- CW-RFB / Installation of 13 no s. Solar Boreholes (in second Infrastructure Rehabilitation ary schools)- GSS Gombi, GD Request for Quota Single Stage - One E 2019-01-0 IDA / 59880 and Service Delivery Restora Post Open - National 544,864.17 0.00 Canceled 2018-08-22 2018-09-30 SS Garkida, GSS Hong, GDSS tions nvelope 8 tion & Improvement Pella, GSSS Uba, GJSS Uba, G DSS Garaha, GDSS Kwarhi, G DSS Za'ah, GSS Madagli, GSS Shuwa, GSS Gulak, GCSS Shu wa NG-ADAMAWA MCRP-60629- Infrastructure Rehabilitation Single Stage - One E 2019-02-2 CW-RFB / Reconstruction of M IDA / 59880 and Service Delivery Restora Prior Request for Bids Open - National 1,019,295.08 0.00 Canceled 2018-05-04 2018-05-09 2018-06-20 2018-07-20 2018-08-24 nvelope 0 ain Road - Bangshika Road 2. tion & Improvement 5Km NG-ADAMAWA MCRP-72562- Infrastructure Rehabilitation Single Stage - One E 2019-01-3 CW-RFB / Rehabilitation of Mi IDA / 59880 and Service Delivery Restora Prior Request for Bids Open - National 545,138.07 0.00 Canceled 2018-08-02 2018-08-07 2018-08-21 2018-09-11 2018-10-02 nvelope 0 chika Hospital Road tion & Improvement Page 1 NG-ADAMAWA MCRP-72563- Infrastructure Rehabilitation Single Stage - One E 2019-01-2 CW-RFB / Rehabilitation of ac IDA / 59880 and Service Delivery Restora Prior Request for Bids Open - National 1,235,124.92 0.00 Canceled 2018-08-02 2018-08-07 2018-08-21 2018-09-05 2018-09-23 nvelope 1 cess road to Garkida tion & Improvement NG-ADAMAWA MCRP-74493- Infrastructure Rehabilitation Request for Quota Single Stage - One E Under Imple 2019-02-0 CW-RFQ / Rehabilitation of Ga IDA / 59880 and Service Delivery Restora Post Open - National 698,530.00 0.00 2018-08-20 2018-10-11 tions nvelope mentation 8 rkida Water Supply System tion & Improvement NG-ADAMAWA MCRP-74494- Infrastructure Rehabilitation Request for Quota Single Stage - One E 2019-02-0 CW-RFQ / Rehabilitation of M IDA / 59880 and Service Delivery Restora Post Open - National 458,241.00 392,382.20 Completed 2018-08-20 2018-10-11 2019-09-18 tions nvelope 8 aiha Water Supply System tion & Improvement NG-ADAMAWA MCRP-74626- Infrastructure Rehabilitation Request for Quota Single Stage - One E 2019-02-0 CW-RFQ / Rehabilitation of Ge IDA / 59880 and Service Delivery Restora Post Open - National 491,803.00 427,332.84 Completed 2018-08-20 2018-10-11 2020-09-16 tions nvelope 8 neral Hospital Michika tion & Improvement NG-ADAMAWA MCRP-69765- CW-RFQ / Renovation of GSS i Infrastructure Rehabilitation Request for Quota Single Stage - One E Under Imple 2019-02-1 n 10 Towns (Gombi, Hong, Ub IDA / 59880 and Service Delivery Restora Post Limited 1,650,980.47 0.00 2018-12-08 2018-12-14 tions nvelope mentation 2 a, Shuwa, Michika, Bazza, Mu tion & Improvement bi 1, Maiha, Madagali, Mubi N orth) NG-ADAMAWA MCRP-69808- Infrastructure Rehabilitation Request for Quota Single Stage - One E 2019-03-2 CW-RFQ / Upgrade and Expan IDA / 59880 and Service Delivery Restora Post Limited 1,189,261.84 991,392.87 Completed 2018-11-20 2019-06-27 2018-12-25 2019-09-18 tions nvelope 5 sion of Michika Water supply tion & Improvement project NG-ADAMAWA MCRP-89273- CW-RFQ / Construction of 5 S Infrastructure Rehabilitation olar Boreholes in 5 Sec. Schs. Request for Quota Single Stage - One E 2019-02-2 IDA / 59880 and Service Delivery Restora Post Open - National 1,062,512.28 0.00 Signed 2018-12-12 2018-12-23 2018-12-28 , 11 in PHCs and 92 HPBH in c tions nvelope 1 tion & Improvement ommunities in Michika and M adagali LGAs of Adamawa Sta te NG-ADAMAWA MCRP-89262- CW-RFQ / Construction of 10 Infrastructure Rehabilitation Solar Powered Boreholes in P Request for Quota Single Stage - One E 2019-02-2 IDA / 59880 and Service Delivery Restora Post Open - National 759,971.70 0.00 Signed 2018-12-12 2018-12-23 HCs, and 80 HPBH in Commu tions nvelope 1 tion & Improvement nities in Mubi North and Mubi South LGAs of Adamawa Stat e NG-ADAMAWA MCRP-89688- CW-RFQ / Construction of 8 S Infrastructure Rehabilitation Request for Quota Single Stage - One E 2019-02-2 olar boreholes in 8 Sec. Schs, IDA / 59880 and Service Delivery Restora Post Open - National 1,529,944.23 0.00 Signed 2018-12-12 2018-12-23 tions nvelope 1 16 in PHCs and 123 HPBH in tion & Improvement communities in Gombi, Hong and Maiha LGAs NG-ADAMAWA MCRP-101409 Infrastructure Rehabilitation Request for Quota Single Stage - One E 2018-12-0 -CW-RFQ / Rehabilitation of e IDA / 59880 and Service Delivery Restora Post Limited 30,475.00 25,604.58 Completed 2018-04-11 2019-06-27 2018-06-06 2019-09-18 tions nvelope 3 xisitng Water Supply sources tion & Improvement in Gombi NG-ADAMAWA MCRP-101383 Infrastructure Rehabilitation Request for Quota Single Stage - One E 2018-12-0 -CW-RFQ / Rehabilitation of U IDA / 59880 and Service Delivery Restora Post Limited 71,967.00 0.00 Terminated 2018-04-11 2019-06-27 2018-06-06 2019-09-05 tions nvelope 3 ba Water Supply system tion & Improvement NG-ADAMAWA MCRP-101413 Infrastructure Rehabilitation Request for Quota Single Stage - One E 2018-12-0 -CW-RFQ / Rehabilitation of M IDA / 59880 and Service Delivery Restora Post Limited 138,193.00 114,778.49 Completed 2018-04-11 2019-06-27 2018-06-06 2019-09-18 tions nvelope 3 ichika Water supply system tion & Improvement NG-ADAMAWA MCRP-101412 Infrastructure Rehabilitation Request for Quota Single Stage - One E 2018-12-0 -CW-RFQ / Rehabilitation of G IDA / 59880 and Service Delivery Restora Post Limited 179,190.00 152,854.94 Completed 2018-04-11 2019-06-27 2018-06-06 2019-09-18 tions nvelope 3 ulak Water Supply System tion & Improvement NG-ADAMAWA MCRP-101410 Infrastructure Rehabilitation Request for Quota Single Stage - One E 2018-12-0 -CW-RFQ / Rehabilitation of H IDA / 59880 and Service Delivery Restora Post Limited 116,646.00 94,375.21 Completed 2018-04-11 2019-06-27 2018-06-06 2019-09-18 tions nvelope 3 ong Water Supply System tion & Improvement NG-ADAMAWA MCRP-101394 -CW-RFQ / Construction VIP L Infrastructure Rehabilitation atrine of 3-Compartment (2 B Request for Quota Single Stage - One E 2019-03-0 IDA / 59880 and Service Delivery Restora Post Limited 247,705.00 199,279.37 Completed 2018-07-11 2019-02-25 2018-09-05 2019-04-07 locks in 7 Primary Schools, 7 tions nvelope 4 tion & Improvement Motor Parks and 8 Markets in Mubi-North & Mubi-South LGA s) NG-ADAMAWA MCRP-101443 -CW-RFQ / Construction VIP L Infrastructure Rehabilitation atrine of 3-Compartment (2 B Request for Quota Single Stage - One E 2019-03-0 IDA / 59880 and Service Delivery Restora Post Limited 377,455.00 326,673.74 Completed 2018-07-11 2019-02-25 2018-09-05 2019-04-29 locks in 10 Primary schools, 1 tions nvelope 4 tion & Improvement 2 motor parks and 9 markets in Gombi, Hong & Maiha LGA s) NG-ADAMAWA MCRP-101386 -CW-RFQ / Construction of VIP Infrastructure Rehabilitation Latrines of 3-Compartment (2 Request for Quota Single Stage - One E 2019-03-0 IDA / 59880 and Service Delivery Restora Post Limited 283,092.00 228,848.59 Completed 2018-07-12 2019-02-25 2018-09-06 2019-04-10 Blocks in 8 Primary Schools, tions nvelope 5 tion & Improvement 8 Motor Parks and 8 Markets i n Michika & Madagali LGAs ) NG-ADAMAWA MCRP-145907 -CW-RFB / Rehabilitation of T Infrastructure Rehabilitation Single Stage - One E 10,150,239.7 12,066,531. 2021-07-3 hree (3) Roads in Three (3) IDA / 59880 and Service Delivery Restora Prior Request for Bids Open - National Completed 2019-11-18 2020-02-05 2019-11-23 2020-02-18 2019-12-18 2020-03-17 2020-01-09 2020-08-07 2020-01-30 2020-09-05 nvelope 1 53 0 Local Government Areas of A tion & Improvement damawa State, Mubi, Michika and Gombi. NG-ADAMAWA MCRP-177610 Infrastructure Rehabilitation Request for Quota Single Stage - One E 2021-04-0 -CW-RFQ / Rehabilitation of M IDA / 59880 and Service Delivery Restora Post Limited 800,000.00 416,527.96 Completed 2020-08-23 2021-10-05 2020-10-11 2021-11-15 tions nvelope 9 ale and Female Hostels in GS tion & Improvement S Michika NG-ADAMAWA MCRP-177564 Infrastructure Rehabilitation -CW-RFQ / Rehabilitation of Cl Request for Quota Single Stage - One E 2021-04-0 IDA / 59880 and Service Delivery Restora Post Limited 200,000.00 183,055.72 Completed 2020-08-24 2021-10-12 2020-10-08 2021-12-18 assrooms and Teachers Offic tions nvelope 6 tion & Improvement es at GTC Shuwa NG-ADAMAWA MCRP-177565 Infrastructure Rehabilitation Request for Quota Single Stage - One E 2021-03-2 -CW-RFQ / Construction of 50 IDA / 59880 and Service Delivery Restora Post Limited 217,100.00 175,928.00 Signed 2020-08-09 2021-02-02 2020-09-27 2021-04-14 tions nvelope 6 Hand Pump Boreholes in Sev tion & Improvement en LGAs NG-ADAMAWA MCRP-177582 Infrastructure Rehabilitation Request for Quota Single Stage - One E 2021-04-0 -CW-RFQ / Construction of 30 IDA / 59880 and Service Delivery Restora Post Limited 360,000.00 0.00 Signed 2020-08-15 2022-07-19 2020-10-03 2022-09-20 tions nvelope 1 nos VIP Latrines in Seven LGA tion & Improvement s NG-ADAMAWA MCRP-158675 Infrastructure Rehabilitation Request for Quota Single Stage - One E 2021-03-2 -CW-RFQ / Upgrade and Expa IDA / 59880 and Service Delivery Restora Post Limited 350,000.00 272,410.73 Completed 2020-08-05 2020-07-31 2020-09-23 2020-09-01 tions nvelope 2 nsion of Gulak water supply s tion & Improvement cheme NG-ADAMAWA MCRP-169382 Infrastructure Rehabilitation Request for Quota Single Stage - One E 2021-03-2 -CW-RFQ / Rehabilitation of D IDA / 59880 and Service Delivery Restora Post Limited 296,194.00 273,739.87 Completed 2020-07-20 2021-10-12 2020-09-21 2021-12-12 tions nvelope 0 ermatology Centre, Virgwi tion & Improvement Page 2 NG-ADAMAWA MCRP-177608 Infrastructure Rehabilitation Request for Quota Single Stage - One E Under Imple 2021-04-2 -CW-RFQ / Renovation of 8 Se IDA / 59880 and Service Delivery Restora Post Limited 1,300,000.00 0.00 2020-09-05 2020-10-24 tions nvelope mentation 2 condary Schools in 7 LGAS tion & Improvement NG-ADAMAWA MCRP-177561 Infrastructure Rehabilitation Request for Quota Single Stage - One E Under Imple 2021-03-2 -CW-RFQ / Rehabilitation of 7 IDA / 59880 and Service Delivery Restora Post Limited 700,000.00 0.00 2020-08-08 2021-09-07 2020-09-26 tions nvelope mentation 5 nos Primary Schools tion & Improvement NG-ADAMAWA MCRP-177557 Infrastructure Rehabilitation Request for Quota Single Stage - One E Under Imple 2021-04-1 -CW-RFQ / Rehabilitation of 7 IDA / 59880 and Service Delivery Restora Post Limited 1,000,000.00 0.00 2020-08-31 2020-10-19 tions nvelope mentation 7 nos. Primary Health Care Cen tion & Improvement ter (PHCC) NG-ADAMAWA MCRP-69811- Infrastructure Rehabilitation Request for Quota Single Stage - One E 2021-02-1 CW-RFQ / Renovation of 17 N IDA / 59880 and Service Delivery Restora Post Limited 1,106,804.87 0.00 Completed 2020-07-12 2020-06-30 2020-08-14 2020-09-04 tions nvelope 0 os Primary School over 7 LGA tion & Improvement s NG-ADAMAWA MCRP-60939- Infrastructure Rehabilitation Request for Quota Single Stage - One E 2021-02-1 CW-RFQ / Construction of Ne IDA / 59880 and Service Delivery Restora Post Open - National 265,366.00 226,300.17 Completed 2020-07-07 2020-08-18 2020-09-15 tions nvelope 4 w Trauma Center @ General tion & Improvement Hospital mubi NG-ADAMAWA MCRP-156670 Infrastructure Rehabilitation -CW-RFQ / Rehabilitation of Pr Request for Quota Single Stage - One E 2021-01-2 IDA / 59880 and Service Delivery Restora Post Limited 1,066,944.00 0.00 Completed 2020-07-27 2021-09-07 2020-09-01 2021-11-15 imary Schools in Michika and tions nvelope 9 tion & Improvement Madagali LGAs of Adamawa S tate NG-ADAMAWA MCRP-156672 Infrastructure Rehabilitation -CW-RFQ / Renovation of Gov Request for Quota Single Stage - One E Pending Imp 2021-03-0 IDA / 59880 and Service Delivery Restora Post Limited 1,326,768.00 0.00 2020-08-02 2020-09-07 ernment Secondary Schools i tions nvelope lementation 6 tion & Improvement n Michika and Madagali LGAs of Adamawa State NG-ADAMAWA MCRP-101432 Infrastructure Rehabilitation Request for Quota Single Stage - One E 2018-12-2 -CW-RFQ / Rehabilitation of L IDA / 59880 and Service Delivery Restora Post Limited 315,082.00 0.00 Canceled 2018-05-05 2018-06-30 tions nvelope 7 ocal Government Secretariat tion & Improvement - Madagali NG-ADAMAWA MCRP-177556 Infrastructure Rehabilitation 2021-06-0 -CW-DIR / Rehabilitation of Mi IDA / 59880 and Service Delivery Restora Post Direct Selection Direct 1,000,000.00 0.00 Canceled 2020-10-29 2020-11-03 2020-12-08 6 chika General Hospital Road ( tion & Improvement additional 2KM) NG-ADAMAWA MCRP-69800- Infrastructure Rehabilitation Request for Quota Single Stage - One E 2019-03-1 CW-RFQ / Rehabilitation of Co IDA / 59880 and Service Delivery Restora Post Limited 451,768.85 0.00 Canceled 2018-07-22 2018-09-16 tions nvelope 5 ttage Hospital in Madagali tion & Improvement NG-ADAMAWA MCRP-277807 Infrastructure Rehabilitation Request for Quota -CW-RFQ / Rehabilitation of G Request for Quota Single Stage - One E 2023-01-2 IDA / 66490 and Service Delivery Restora Post Limited tions (Non Bank-S 500,000.00 0.00 Completed 2022-07-05 2023-06-19 2022-07-31 2023-07-20 eneral Hospital Garkida, Gom tions nvelope 7 tion & Improvement PD) bi LGA in Adamawa State NG-ADAMAWA MCRP-278038 Infrastructure Rehabilitation Request for Quota -CW-RFQ / Rehabilitation of C Request for Quota Single Stage - One E 2023-01-2 IDA / 66490 and Service Delivery Restora Post Limited tions (Non Bank-S 228,400.00 0.00 Completed 2022-07-05 2023-06-19 2022-07-31 2023-07-20 ottage Hospital Maiha, Maiha tions nvelope 7 tion & Improvement PD) LGA in Adamawa State NG-ADAMAWA MCRP-278042 -CW-RFQ / Provision of Hand Infrastructure Rehabilitation Request for Quota Request for Quota Single Stage - One E Under Imple 2022-12-0 Pump Boreholes (HPBHs) in V IDA / 66490 and Service Delivery Restora Post Limited tions (Non Bank-S 285,000.00 0.00 2022-04-27 2022-06-10 tions nvelope mentation 7 entiilated Improved Pit (VIP) T tion & Improvement PD) oilets locations in Adamawa S tate. NG-ADAMAWA MCRP-277738 Infrastructure Rehabilitation Request for Quota -CW-RFQ / Rehabilitation of A Request for Quota Single Stage - One E 2022-12-1 IDA / 66490 and Service Delivery Restora Post Limited tions (Non Bank-S 125,000.00 0.00 Signed 2022-05-17 2024-02-20 2022-06-16 2024-03-20 rea Social Welfare/ Youth Dev tions nvelope 3 tion & Improvement PD) elopment Offices in Adamawa State. NG-ADAMAWA MCRP-277787 Request for Bids - Infrastructure Rehabilitation -CW-RFQ / Rehabilitation and Single Stage - One E Small Works SPD ( 2023-05-0 IDA / 66490 and Service Delivery Restora Post Request for Bids Limited 770,000.00 0.00 Canceled 2022-09-22 2022-09-27 2022-10-18 2022-11-01 2022-11-09 maintenance of 13 KM Michik nvelope 1 envelope proces 8 tion & Improvement a s) - Vi- Rhuro Road with Culvert s NG-ADAMAWA MCRP-176277 Infrastructure Rehabilitation Request for Quota -CW-RFQ / Construction of 21 Request for Quota Single Stage - One E 2021-03-2 IDA / 59880 and Service Delivery Restora Post Limited tions (Non Bank-S 852,900.00 743,624.21 Completed 2020-08-08 2021-01-04 2020-09-22 2021-03-08 Solar Powered Boreholes in M tions nvelope 1 tion & Improvement PD) ichika and Madagali LGAs of Adamawa State. NG-ADAMAWA MCRP-156262 Infrastructure Rehabilitation Request for Quota -CW-RFQ / Construction of Sol Request for Quota Single Stage - One E 2021-05-0 IDA / 59880 and Service Delivery Restora Post Limited tions (Non Bank-S 560,000.00 544,079.48 Completed 2020-09-09 2021-02-02 2020-11-04 2022-03-22 ar Powered Boreholes in the I tions nvelope 3 tion & Improvement PD) nsurgency affected LGAs of A damawa State. NG-ADAMAWA MCRP-264450 Infrastructure Rehabilitation Request for Quota -CW-RFQ / Rehabilitation of G Request for Quota Single Stage - One E Under Imple 2022-07-1 IDA / 59880 and Service Delivery Restora Post Limited tions (Non Bank-S 451,768.85 0.00 2021-11-27 2022-01-11 overnment Secondary School tions nvelope mentation 0 tion & Improvement PD) (GSS) Madagali NG-ADAMAWA MCRP-282736 Request for Quota -CW-NULL / Rehabilitate/Upgr Infrastructure Rehabilitation Request for Quota Single Stage - One E tions - Small Work 2023-03-0 ade 1 no. International Cattle IDA / 66490 and Service Delivery Restora Post Limited 350,000.00 0.00 Canceled 2022-08-07 2022-09-04 tions nvelope s (Emergency) SP 3 Market including veterinary cl tion & Improvement D -Competitive inics in Adamawa State. NG-ADAMAWA MCRP-277801 Request for Bids - -CW-RFQ / Rehabilitation and Infrastructure Rehabilitation Single Stage - One E Small Works SPD ( 2023-05-0 maintenance of Michika - Vill IDA / 66490 and Service Delivery Restora Post Request for Bids Limited 710,000.00 0.00 Canceled 2022-09-22 2022-09-27 2022-10-18 2022-11-01 2022-11-09 nvelope 1 envelope proces 8 ekwa - Road tion & Improvement s) Dzurok farming Community ( 15Km) NG-ADAMAWA MCRP-278127 Request for Bids - -CW-RFQ / Rehabilitation and Infrastructure Rehabilitation Single Stage - One E Small Works SPD ( 2023-05-0 maintenance of 13km Gella - IDA / 66490 and Service Delivery Restora Post Request for Bids Limited 750,000.00 0.00 Canceled 2022-09-22 2022-09-27 2022-10-18 2022-11-01 2022-11-08 nvelope 1 envelope proces 7 Kwaja - Dumo road with drain tion & Improvement s) age facilities Request for Bids - NG-ADAMAWA MCRP-277810 Infrastructure Rehabilitation Single Stage - One E Small Works SPD ( 2023-05-0 -CW-RFQ / Rehabilitation and IDA / 66490 and Service Delivery Restora Post Request for Bids Limited 700,000.00 0.00 Canceled 2022-09-22 2022-09-27 2022-10-18 2022-11-01 2022-11-08 nvelope 1 envelope proces 7 maintenance of 13 Km Mubi- tion & Improvement s) Bahuli Road NG-ADAMAWA MCRP-177616 Infrastructure Rehabilitation Request for Quota Single Stage - One E 2021-05-0 -CW-RFQ / Rehabilitation of ro IDA / 59880 and Service Delivery Restora Post Limited 1,000,000.00 0.00 Canceled 2020-09-07 2020-11-02 tions nvelope 1 ad network in Madagali Town tion & Improvement ship NG-ADAMAWA MCRP-297124 Infrastructure Rehabilitation Request for Quota 2023-01-1 -CW-DIR / Rehabilitation of ro IDA / 59880 and Service Delivery Restora Post Direct Selection Direct tions (Non Bank-S 1,400,000.00 0.00 Signed 2022-06-22 2022-08-09 2022-06-27 2022-08-10 2022-07-18 2023-01-13 4 ad network in Madagali Town tion & Improvement PD) ship NG-ADAMAWA MCRP-297079 Infrastructure Rehabilitation Request for Quota -CW-RFQ / Provision of Solar Request for Quota Single Stage - One E 2023-04-1 IDA / 66490 and Service Delivery Restora Post Limited tions (Non Bank-S 1,435,506.00 0.00 Completed 2022-09-18 2023-02-28 2022-10-19 2023-04-05 Powered Bore Holes (SPBH) i tions nvelope 7 tion & Improvement PD) n Sanitation Centers and sele cted communities Page 3 NG-ADAMAWA MCRP-297106 Infrastructure Rehabilitation Request for Quota -CW-RFQ / Provision of Solar Request for Quota Single Stage - One E 2023-04-1 IDA / 66490 and Service Delivery Restora Post Limited tions (Non Bank-S 1,435,506.00 0.00 Completed 2022-09-18 2023-02-28 2022-10-19 2023-03-31 Powered Bore holes (SPBHs) i tions nvelope 7 tion & Improvement PD) n Primary Health Care Center s (PHCCs) NG-ADAMAWA MCRP-176281 Infrastructure Rehabilitation Request for Quota Single Stage - One E 2021-01-0 -CW-RFQ / Refencing of Perim IDA / 59880 and Service Delivery Restora Post Limited 400,000.00 0.00 Canceled 2020-08-23 2020-09-30 tions nvelope 9 eter Fence at GSS Gombi (Ent tion & Improvement ire School) NG-ADAMAWA MCRP-333108 -CW-RFQ / Renovation of Gov Infrastructure Rehabilitation Request for Quota Request for Quota Single Stage - One E 2023-08-1 ernment Day Secondary Scho IDA / 59880 and Service Delivery Restora Post Limited tions (Non Bank-S 400,000.00 0.00 Completed 2023-01-17 2023-01-18 2023-02-15 2023-02-14 tions nvelope 4 ol UBA in Hong Local Govern tion & Improvement PD) ment Area of Adamawa State . NG-ADAMAWA MCRP-352765 Infrastructure Rehabilitation Request for Quota -CW-RFQ / Provision of Solar Request for Quota Single Stage - One E 2023-11-0 IDA / 66490 and Service Delivery Restora Post Limited tions (Non Bank-S 1,435,506.00 0.00 Completed 2023-04-05 2023-02-28 2023-05-06 2023-04-14 Powered Bore Holes (SPBHs) i tions nvelope 2 tion & Improvement PD) n public places and in Comm unity based woodlots Request for Bids - NG-ADAMAWA MCRP-356005 Infrastructure Rehabilitation Single Stage - One E Small Works SPD ( Under Imple 2023-12-2 -CW-RFB / Upgrade/Renovatio IDA / 66490 and Service Delivery Restora Post Request for Bids Limited 3,987,166.00 0.00 2023-04-25 2024-11-27 2023-04-30 2023-05-30 2023-06-20 2023-07-02 nvelope 1 envelope proces mentation 9 n of 6 nos. Schools in Adama tion & Improvement s) wa State NG-ADAMAWA MCRP-355986 Request for Bids - Infrastructure Rehabilitation -CW-RFB / Rehabilitation of Pr Single Stage - One E Small Works SPD ( Under Imple 2023-10-2 IDA / 66490 and Service Delivery Restora Post Request for Bids Limited 1,200,000.00 0.00 2023-04-24 2023-06-12 2023-04-29 2023-05-29 2023-06-19 2023-07-01 imary Health Care Centers (P nvelope 1 envelope proces mentation 9 tion & Improvement HCCs) in Adamawa State. s) NG-ADAMAWA MCRP-355974 Request for Bids - Infrastructure Rehabilitation -CW-RFB / Rehabilitation of (6 Single Stage - One E Works (without pr 2024-03-0 IDA / 66490 and Service Delivery Restora Post Request for Bids Limited 7,718,910.00 0.00 Signed 2023-04-18 2023-04-27 2023-04-23 2023-05-10 2023-05-28 2023-06-07 2023-06-27 2023-06-29 2023-07-09 2023-08-17 ) Roads in (3) Local Governm nvelope equalification) SP 5 tion & Improvement ent Areas in Adamawa State. D NG-ADAMAWA MCRP-376160 Infrastructure Rehabilitation Request for Quota -CW-RFQ / Rehabilitation and Request for Quota Single Stage - One E 2024-03-1 IDA / 66490 and Service Delivery Restora Post Limited tions (Non Bank-S 1,236,081.00 0.00 Signed 2023-08-22 2023-08-28 2023-09-20 2023-10-03 Upgrade of Murke, Baza, Bele tions nvelope 8 tion & Improvement PD) l and Hildi Water Supply Syst em. NG-ADAMAWA MCRP-376169 Infrastructure Rehabilitation Request for Quota -CW-RFQ / Rehabilitation and Request for Quota Single Stage - One E 2024-04-0 IDA / 66490 and Service Delivery Restora Post Limited tions (Non Bank-S 600,000.00 0.00 Signed 2023-08-22 2023-09-26 2023-10-06 2023-10-03 Upgrade of Ganye and Shelle tions nvelope 3 tion & Improvement PD) ng Water Scheme distribution network NG-ADAMAWA MCRP-376173 Request for Bids - Infrastructure Rehabilitation -CW-RFB / upgrade of Numan Single Stage - One E Small Works SPD ( 2024-04-0 IDA / 66490 and Service Delivery Restora Post Request for Bids Limited 909,023.26 0.00 Signed 2023-08-17 2023-08-21 2023-08-22 2023-08-28 2023-09-12 2023-09-11 2023-09-26 2023-09-26 2023-10-06 2023-10-03 water system including laying nvelope 1 envelope proces 3 tion & Improvement of 15 km townwide pipe netw s) ork. NG-ADAMAWA MCRP-376180 -CW-RFB / Upgrade of Yola Zo Request for Bids - nal Office and Extension of tr Infrastructure Rehabilitation Single Stage - One E Small Works SPD ( 2024-04-0 ansmission line from Jippu Ja IDA / 66490 and Service Delivery Restora Post Request for Bids Limited 650,000.00 0.00 Signed 2023-08-17 2023-08-21 2023-08-22 2023-08-28 2023-09-12 2023-09-11 2023-09-26 2023-09-26 2023-10-05 2023-10-03 nvelope 1 envelope proces 2 m Round to elevated Water t tion & Improvement s) ank at Water Board Zonal Offi ce with distribution to key loc ations NG-ADAMAWA MCRP-397577 -CW-RFQ / Setting up, prepar ation and maintenance of 5 n os Demonstration Farm (for d Strengthening Peace Buildin Request for Quota Request for Quota Single Stage - One E 2024-05-2 emonstration of the advantag IDA / 66490 g, Stability and Social Cohesi Post Limited tions (Non Bank-S 170,000.00 0.00 Completed 2023-12-24 2024-02-20 2024-01-23 2024-03-20 tions nvelope 2 es of improved verities and fo on PD) r teaching of modern agricult ure techniques to beneficiary farmers) in areas of identified Farmer clusters where Project i NG-ADAMAWA MCRP-392206 National Procure Infrastructure Rehabilitation -CW-DIR / Rehabilitation of Mi ment Document - 2024-07-2 IDA / 66490 and Service Delivery Restora Post Direct Selection Direct - National 2,000,000.00 0.00 Completed 2023-12-28 2024-02-06 2024-01-02 2024-02-13 2024-01-28 2024-03-08 chika Mararraba Garta Road i 1 Envelope proces 6 tion & Improvement n Adamawa State. s (Non Bank-SPD) NG-ADAMAWA MCRP-408982 Request for Bids - Strengthening Peace Buildin -CW-RFB / Rehabilitation and Single Stage - One E Small Works SPD ( 2024-10-1 IDA / 66490 g, Stability and Social Cohesi Post Request for Bids Limited 944,444.44 0.00 Signed 2024-02-20 2024-02-06 2024-02-25 2024-02-20 2024-03-10 2024-03-05 2024-03-31 2024-03-11 2024-04-14 2024-03-21 upgrade of Sports Centers an nvelope 1 envelope proces 1 on d Youth Centers in Adamawa s) State. NG-ADAMAWA MCRP- C1-277 Strengthening Peace Buildin Request for Quota 739-CW-RFQ / Construction of Request for Quota Single Stage - One E 2024-07-3 IDA / 66490 g, Stability and Social Cohesi Post Limited - National tions (Non Bank-S 360,000.00 0.00 Signed 2024-02-29 2024-02-20 2024-03-29 2024-03-20 Rice Mill in Fufore and Numan tions nvelope 1 on PD) LGA’s in Adamawa State. NG-ADAMAWA MCRP-416603 Strengthening Peace Buildin Request for Quota -CW-RFQ / Rehabilitation of Ir Request for Quota Single Stage - One E 2024-08-2 IDA / 66490 g, Stability and Social Cohesi Post Limited - National tions (Non Bank-S 600,000.00 0.00 Signed 2024-03-29 2024-04-16 2024-04-24 2024-05-30 rigation Site for rice/Vegetabl tions nvelope 2 on PD) es in Adamawa State NG-ADAMAWA MCRP-397579 Strengthening Peace Buildin Request for Quota Request for Quota Single Stage - One E 2024-05-2 -CW-RFQ / Rehabilitate Irrigat IDA / 66490 g, Stability and Social Cohesi Post Limited tions (Non Bank-S 300,000.00 0.00 Canceled 2023-12-26 2024-01-24 tions nvelope 3 ion Site Rice/ Vegetables in A on PD) damawa State. NG-ADAMAWA MCRP-419723 Infrastructure Rehabilitation Request for Quota -CW-RFQ / Rehabilitation, upg Request for Quota Single Stage - One E 2024-11-2 IDA / 59880 and Service Delivery Restora Post Limited - National tions (Non Bank-S 446,166.55 0.00 Signed 2024-04-29 2024-04-30 2024-05-27 2024-08-09 rade and expansion of UBA W tions nvelope 3 tion & Improvement PD) ater supply system NG-ADAMAWA MCRP-419782 Strengthening Peace Buildin Request for Quota -CW-RFQ / Rehabilitation and Request for Quota Single Stage - One E 2024-07-2 IDA / 66490 g, Stability and Social Cohesi Post Limited - National tions (Non Bank-S 100,000.00 0.00 Canceled 2024-04-29 2024-05-23 Equipping of Adamawa Agric tions nvelope 2 on PD) Skills Development Center Da mare Girei LGA. NG-ADAMAWA MCRP-419779 -CW-RFQ / Rehabilitation/Upg Strengthening Peace Buildin Request for Quota rade and Equipping of Trainin Request for Quota Single Stage - One E 2024-08-1 IDA / 66490 g, Stability and Social Cohesi Post Limited - National tions (Non Bank-S 200,000.00 0.00 Completed 2024-04-26 2024-07-30 2024-05-20 2024-08-20 g facilities at College of Agric tions nvelope 8 on PD) ulture Ganye Outreach Cente r in Gyawana, Lamurde LGA. NG-ADAMAWA MCRP-419775 Strengthening Peace Buildin Request for Quota Request for Quota Single Stage - One E 2024-09-2 -CW-RFQ / Provision of Uplan IDA / 66490 g, Stability and Social Cohesi Post Limited - National tions (Non Bank-S 1,200,000.00 0.00 Signed 2024-05-03 2024-07-04 2024-05-28 2024-07-31 tions nvelope 5 d Mini Irrigation Schemes on PD) NG-ADAMAWA MCRP-419781 Strengthening Peace Buildin Request for Quota Request for Quota Single Stage - One E Under Imple 2024-07-1 -CW-RFQ / Rehabilitation of N IDA / 66490 g, Stability and Social Cohesi Post Limited - National tions (Non Bank-S 150,000.00 0.00 2024-04-23 2024-05-17 tions nvelope mentation 6 uman Poultry Farming Hub, N on PD) uman LGA. NG-ADAMAWA MCRP-447905 -CW-RFQ / Rehabilitation of fa Infrastructure Rehabilitation Request for Quota Request for Quota Single Stage - One E 2025-04-1 iled Culvert at Rugange-Njob IDA / 66490 and Service Delivery Restora Post Limited - National tions (Non Bank-S 200,000.00 0.00 Signed 2024-09-14 2024-09-19 2024-10-15 2024-10-31 tions nvelope 3 oliyo Access Road in Yola Sou tion & Improvement PD) th LGA of Adamawa State. Page 4 NG-ADAMAWA MCRP-447906 Infrastructure Rehabilitation Request for Quota -CW-RFQ / Rehabilitation of S Request for Quota Single Stage - One E 2025-01-2 IDA / 66490 and Service Delivery Restora Post Limited - National tions (Non Bank-S 130,000.00 0.00 Signed 2024-09-11 2024-11-19 2024-10-24 2024-12-24 uwa Primary Health Care Cen tions nvelope 2 tion & Improvement PD) ter (PHCC) in Lamurde LGA, A damawa State. NG-ADAMAWA MCRP-447911 Infrastructure Rehabilitation Request for Quota -CW-RFQ / Rehabilitation of P Request for Quota Single Stage - One E 2025-01-0 IDA / 66490 and Service Delivery Restora Post Limited - National tions (Non Bank-S 130,000.00 0.00 Signed 2024-09-11 2024-11-12 2024-10-07 2024-12-24 are Primary Health Care Cent tions nvelope 5 tion & Improvement PD) er (PHCC) in Numan LGA, Ada mawa State. NG-ADAMAWA MCRP-447916 Infrastructure Rehabilitation Request for Quota -CW-RFQ / Construction of 30 Request for Quota Single Stage - One E 2025-01-1 IDA / 66490 and Service Delivery Restora Post Limited - National tions (Non Bank-S 738,000.00 0.00 Signed 2024-09-15 2024-10-22 2024-10-14 2024-11-20 Nos. Solar powered Boreholes tions nvelope 2 tion & Improvement PD) in selected project locations i n Adamawa State. Request for Quota NG-ADAMAWA MCRP-452067 Infrastructure Rehabilitation tions - Small Work -CW-DIR / Rehabilitation of T 2025-04-1 IDA / 66490 and Service Delivery Restora Post Direct Selection Direct - National s (Emergency) SP 2,500,000.00 0.00 Signed 2024-09-27 2024-07-31 2024-09-30 2024-09-26 2024-10-18 2024-10-15 wo Roads in Madagali LGA, S 6 tion & Improvement D -Non Competitiv huwa-Kirchinga 8.8Km and S e huwa-Pallam 10.7km GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-ADAMAWA MCRP-59598- Infrastructure Rehabilitation Single Stage - One E GO-RFB / Supply of Furniture IDA / 59880 and Service Delivery Restora Post Request for Bids Open - National 245,901.64 0.00 Canceled 2018-02-23 2018-02-28 2018-04-11 2018-05-11 2018-06-15 2018-12-12 nvelope to Primary Schools in 7 LGAs tion & Improvement NG-ADAMAWA MCRP-59960- Infrastructure Rehabilitation GO-RFB / Supply of Books an Single Stage - One E IDA / 59880 and Service Delivery Restora Post Request for Bids Open - National 327,868.85 0.00 Canceled 2018-02-23 2018-02-28 2018-04-11 2018-05-11 2018-06-15 2018-12-12 d Teaching/Learning Material nvelope tion & Improvement s to Primary Schools in 7 LGA s NG-ADAMAWA MCRP-60401- Infrastructure Rehabilitation GO-RFB / Establishment of sp Single Stage - One E IDA / 59880 and Service Delivery Restora Post Request for Bids Open - National 114,754.10 0.00 Canceled 2018-03-13 2018-03-18 2018-04-29 2018-05-29 2018-07-03 2018-12-30 are part supply chain/buffer s nvelope tion & Improvement tock for Water Facilities NG-ADAMAWA MCRP-60936- GO-RFB / Train the Trainer/Us er Workshops (i.e. 2 per LGA) Infrastructure Rehabilitation for VLOM (Village Level Opera Single Stage - One E IDA / 59880 and Service Delivery Restora Post Request for Bids Open - National 72,131.15 0.00 Canceled 2018-03-19 2018-03-24 2018-05-05 2018-06-04 2018-07-09 2019-01-05 tion and Maintenance) WASH nvelope tion & Improvement COMS, (WASH Committees at LGA Level, WASH Units @ LG As, VHPs (Voluntary Hygiene Promoters) State/LGA Govt Of ficials. NG-ADAMAWA MCRP-60957- Technical Assistance and Pro Request for Quota Single Stage - One E GO-RFQ / Procurement of 1 Vi IDA / 59880 Post Open - National 20,327.87 0.00 Signed 2018-02-18 2018-04-15 2018-09-19 2018-10-12 ject Management Support tions nvelope deo Camera, 2 DLSR Camera s, NG-ADAMAWA MCRP-74572- GO-DIR / Procurement of Vide Technical Assistance and Pro IDA / 59880 Post Direct Selection Direct 85,249.00 67,807.55 Completed 2018-08-20 2018-10-22 2018-08-25 2018-09-18 2018-09-18 2018-11-18 2018-12-17 2019-01-19 o Conference Equipment and ject Management Support Internet Connectivity (Dedica ted) for 1 year. NG-ADAMAWA MCRP-69762- GO-RFQ / Procurement of 1 S Technical Assistance and Pro Request for Quota Single Stage - One E Under Imple port Utility Vehicle, 1 Eightee IDA / 59880 Post Limited 548,652.20 0.00 2018-07-21 2018-09-15 2019-03-14 ject Management Support tions nvelope mentation n Seater Bus, 3 Double Cabin Pick Up Vans and 1 Four Door Sedan. NG-ADAMAWA MCRP-69822- Strengthening Peace Buildin Request for Quota Single Stage - One E GO-RFQ / Provission of Small IDA / 59880 g, Stability and Social Cohesi Post Limited 183,431.00 171,132.92 Completed 2018-08-23 2020-06-30 2018-09-16 2020-08-22 2018-10-31 2020-09-11 tions nvelope Animals For Livelihood Suppo on rt NG-ADAMAWA MCRP-69753- Strengthening Peace Buildin Request for Quota Single Stage - One E GO-RFQ / Non Agricultural Liv IDA / 59880 g, Stability and Social Cohesi Post Limited 587,131.00 500,323.91 Completed 2018-08-22 2018-11-20 2018-10-17 2018-12-21 2018-12-26 2019-03-03 tions nvelope elihood Kits. on NG-ADAMAWA MCRP-69823- Infrastructure Rehabilitation Request for Quota Single Stage - One E GO-RFQ / Equipping of Traum IDA / 59880 and Service Delivery Restora Post Limited 214,142.46 383,168.90 Completed 2018-08-05 2022-03-08 2018-09-30 2022-04-07 2019-03-29 2022-06-28 tions nvelope a Center @ Mubi General hos tion & Improvement pital NG-ADAMAWA MCRP-60958- Technical Assistance and Pro Request for Quota Single Stage - One E Under Imple GO-RFQ / Procurement of Offi IDA / 59880 Post Open - National 63,445.10 0.00 2018-08-15 2018-09-19 2018-09-26 ject Management Support tions nvelope mentation ce Furniture NG-ADAMAWA MCRP-74000- GO-RFQ / Supply of Teaching Infrastructure Rehabilitation Request for Quota Single Stage - One E Materials, Labrotary Equipme IDA / 59880 and Service Delivery Restora Post Limited 786,885.00 668,444.08 Completed 2018-08-20 2019-03-07 2018-09-27 2019-04-24 2019-01-05 2019-07-03 tions nvelope nts and First aid Kits to Reha tion & Improvement bilitated Secondary Schools. NG-ADAMAWA MCRP-74210- Strengthening Peace Buildin Request for Quota Single Stage - One E GO-RFQ / Supply of Non-Food IDA / 59880 g, Stability and Social Cohesi Post Limited 492,071.00 379,396.71 Completed 2018-08-21 2018-09-07 2018-09-28 2018-12-23 2018-12-27 2019-02-10 tions nvelope Item Kits For House-hold Sup on port NG-ADAMAWA MCRP-74608- GO-RFQ / Installation of Solar Infrastructure Rehabilitation Request for Quota Single Stage - One E Inverters in 7 Rehabilitated P IDA / 59880 and Service Delivery Restora Post Open - National 249,180.00 243,777.83 Completed 2018-08-20 2018-10-11 2021-12-25 2019-01-19 2022-03-22 tions nvelope HCs, Cottage Hospital in Gula tion & Improvement k and General Hospital Michik a. NG-ADAMAWA MCRP-74618- GO-RFQ / Supply of Medical E Infrastructure Rehabilitation Request for Quota Single Stage - One E quipment to Rehabilitated P IDA / 59880 and Service Delivery Restora Post Open - National 540,984.00 501,499.87 Completed 2018-08-20 2018-10-11 2020-12-15 2019-01-14 2021-03-28 tions nvelope HCs in 7 communities, Cottag tion & Improvement e Hospital in Gulak and Gener al Hospital Michika. NG-ADAMAWA MCRP-74624- Infrastructure Rehabilitation GO-RFQ / Supply of Classroo Request for Quota Single Stage - One E IDA / 59880 and Service Delivery Restora Post Open - National 658,643.00 0.00 Signed 2018-08-20 2018-10-11 2018-11-12 2019-01-19 m Furniture for all Renovated tions nvelope tion & Improvement Secondary Schools. NG-ADAMAWA MCRP-59138- Technical Assistance and Pro Request for Quota Single Stage - One E Under Imple GO-RFQ / Procurement of Co IDA / 59880 Post Open - National 34,131.15 0.00 2018-02-18 2018-04-15 2018-07-14 ject Management Support tions nvelope mentation mputers, Printers and other a ccessories NG-ADAMAWA MCRP-60359- GO-RFQ / Procurement of 60K Technical Assistance and Pro Request for Quota Single Stage - One E IDA / 59880 Post Open - National 42,623.00 28,945.26 Completed 2018-02-18 2018-04-15 2018-09-12 2018-10-12 2018-11-19 VA sound proof Generator, 10 ject Management Support tions nvelope KVA Inverter System Page 5 NG-ADAMAWA MCRP-69797- Strengthening Peace Buildin GO-RFQ / Provision of Agricult Request for Quota Single Stage - One E IDA / 59880 g, Stability and Social Cohesi Prior Limited 1,733,846.00 0.00 Canceled 2018-11-03 2018-12-01 2019-01-15 ural Support kits with Seeds, tions nvelope on Fertilizers and Small Work Far m Tools NG-ADAMAWA MCRP-69802- GO-RFQ / Supply of Essential Infrastructure Rehabilitation Drugs/Medical Consumable to Request for Quota Single Stage - One E IDA / 59880 and Service Delivery Restora Post Open - National 649,180.00 597,201.60 Completed 2018-12-17 2019-02-07 2020-12-14 2019-05-18 2021-01-04 Rehabilitated PHCs in 7 Com tions nvelope tion & Improvement munities, Cottage Hospital in Gulak and General Hospital M ichika. NG-ADAMAWA MCRP-100543 Strengthening Peace Buildin Request for Quota Single Stage - One E -GO-RFQ / Supply of Cereals a IDA / 59880 g, Stability and Social Cohesi Post Limited 808,082.00 654,880.67 Completed 2018-11-03 2019-02-27 2018-12-29 2019-04-03 2019-06-27 2019-06-10 tions nvelope nd Legumes Seeds, on NG-ADAMAWA MCRP-100551 Strengthening Peace Buildin Request for Quota Single Stage - One E -GO-RFQ / Supply of Fertilizer IDA / 59880 g, Stability and Social Cohesi Post Limited 624,671.00 504,611.67 Completed 2018-11-03 2019-02-27 2018-12-29 2019-03-26 2019-06-27 2019-05-27 tions nvelope and Small Work Farm Tools on NG-ADAMAWA MCRP-101424 Infrastructure Rehabilitation -GO-RFQ / Establishment of s Request for Quota Single Stage - One E IDA / 59880 and Service Delivery Restora Post Limited 114,754.00 0.00 Completed 2018-03-18 2023-03-08 2018-05-13 2023-04-05 2018-11-09 2023-06-05 pare part supply chain/buffer tions nvelope tion & Improvement stock for Water Facilities NG-ADAMAWA MCRP-101379 Infrastructure Rehabilitation Request for Quota Single Stage - One E -GO-RFQ / Supply of Furniture IDA / 59880 and Service Delivery Restora Post Limited 245,901.00 0.00 Signed 2018-02-28 2018-10-30 2018-04-25 2018-11-12 2018-10-22 tions nvelope to Primary Schools in 7 LGAs tion & Improvement NG-ADAMAWA MCRP-101419 Infrastructure Rehabilitation -GO-RFQ / Supply of Books an Request for Quota Single Stage - One E IDA / 59880 and Service Delivery Restora Post Limited 327,868.00 273,530.41 Completed 2018-02-28 2019-03-07 2018-04-25 2019-04-23 2018-10-22 2019-05-08 d Teaching/Learning Material tions nvelope tion & Improvement s to Primary Schools in 7 LGA s NG-ADAMAWA MCRP-109600 -GO-RFQ / Installation of CCT Technical Assistance and Pro Request for Quota Single Stage - One E IDA / 59880 Post Limited 32,000.00 22,640.15 Completed 2019-04-17 2019-09-03 2019-05-06 2019-10-13 2019-05-20 2019-10-16 V and Intercom System for th ject Management Support tions nvelope e Adamawa MCRP PCU Office NG-ADAMAWA MCRP-133548 Infrastructure Rehabilitation -GO-RFQ / Branding and Pack Request for Quota Single Stage - One E IDA / 59880 and Service Delivery Restora Post Limited 24,875.00 20,744.10 Completed 2019-07-28 2019-07-30 2019-08-25 2019-09-04 2019-09-15 2019-09-14 aging of Books, Instructional tions nvelope tion & Improvement Material, Laboratory Equipme nt and First Aid Kits. NG-ADAMAWA MCRP-156644 -GO-RFQ / Supply of Solar infr Infrastructure Rehabilitation Request for Quota Single Stage - One E astructure and computers for IDA / 59880 and Service Delivery Restora Post Limited 78,977.88 73,982.97 Completed 2020-08-23 2020-10-12 2020-10-18 2020-12-17 2021-04-16 2021-07-11 tions nvelope Rehabilitated Local Governm tion & Improvement ents Secretariat, Song and M adagali. NG-ADAMAWA MCRP-156636 Infrastructure Rehabilitation -GO-RFQ / Supply of Office Fu Request for Quota Single Stage - One E IDA / 59880 and Service Delivery Restora Post Limited 72,338.00 63,368.86 Completed 2020-08-23 2020-10-12 2020-10-02 2020-12-12 2021-01-30 2021-04-28 rnitures for Rehabilitated Loc tions nvelope tion & Improvement al Governments Secretariat, Song NG-ADAMAWA MCRP-177417 Strengthening Peace Buildin Request for Quota Single Stage - One E -GO-RFQ / Provision of Non A IDA / 59880 g, Stability and Social Cohesi Post Limited 770,000.00 720,510.32 Completed 2020-06-27 2020-11-11 2020-08-04 2020-12-15 2020-09-23 2020-12-24 tions nvelope gric Livelihood Kits on NG-ADAMAWA MCRP-177558 Infrastructure Rehabilitation -GO-RFQ / Purchase of Furnit Request for Quota Single Stage - One E IDA / 59880 and Service Delivery Restora Post Limited 550,000.00 536,094.89 Completed 2020-05-10 2021-03-09 2020-06-28 2021-04-20 2020-12-25 2021-05-20 ure for 8 Sec Schs. Including tions nvelope tion & Improvement mattresses for GSS Maiha NG-ADAMAWA MCRP-177406 Infrastructure Rehabilitation -GO-RFQ / Provision of Solar I Request for Quota Single Stage - One E IDA / 59880 and Service Delivery Restora Post Limited 250,000.00 259,629.93 Completed 2020-05-12 2021-11-18 2020-06-23 2022-01-01 2020-09-21 2022-11-21 nverters and Accessories for tions nvelope tion & Improvement Rehabilitated PHCs NG-ADAMAWA MCRP-169457 Technical Assistance and Pro Request for Quota Single Stage - One E -GO-RFQ / Purchase of AC Uni IDA / 59880 Post Limited 10,000.00 10,230.28 Completed 2020-07-04 2021-04-22 2020-08-06 2021-06-08 2020-08-27 2021-07-08 ject Management Support tions nvelope ts and Furniture for Office NG-ADAMAWA MCRP-176280 Infrastructure Rehabilitation Request for Quota Single Stage - One E -GO-RFQ / Purchase of Books IDA / 59880 and Service Delivery Restora Post Limited 250,000.00 242,339.55 Completed 2020-08-23 2021-02-09 2020-10-07 2021-03-26 2020-11-16 2021-04-14 tions nvelope and Instructional Materials for tion & Improvement 8 Sec. Schools NG-ADAMAWA MCRP-177552 Infrastructure Rehabilitation Request for Quota Single Stage - One E -GO-RFQ / Purchase of Classr IDA / 59880 and Service Delivery Restora Post Limited 300,000.00 290,583.94 Completed 2020-09-22 2020-03-09 2020-11-10 2020-04-28 2021-03-10 2021-07-01 tions nvelope oom Furniture for 7 Primary S tion & Improvement chools NG-ADAMAWA MCRP-177419 Infrastructure Rehabilitation -GO-RFQ / Purchase of Books Request for Quota Single Stage - One E IDA / 59880 and Service Delivery Restora Post Limited 200,000.00 192,061.45 Completed 2020-09-13 2021-02-09 2020-10-28 2021-03-26 2021-01-26 2021-04-14 and Instructional Materials for tions nvelope tion & Improvement 7 Primary. Schools NG-ADAMAWA MCRP-177620 Infrastructure Rehabilitation -GO-RFQ / Provision of Drugs Request for Quota Single Stage - One E IDA / 59880 and Service Delivery Restora Post Limited 200,000.00 210,000.01 Completed 2020-09-29 2022-03-08 2020-11-17 2022-04-18 2021-02-15 2022-09-01 and Essential Supplies to Pri tions nvelope tion & Improvement mary Health Care Centers NG-ADAMAWA MCRP-156633 -GO-RFQ / Purchase of furnit Infrastructure Rehabilitation Request for Quota Single Stage - One E ure for Primary and Seconda IDA / 59880 and Service Delivery Restora Post Limited 300,000.00 290,632.60 Completed 2020-10-03 2021-03-09 2020-11-28 2021-04-27 2021-03-28 2021-07-01 tions nvelope ry Schools in Michika and Ma tion & Improvement dagali LGAs of Adamawa Stat e NG-ADAMAWA MCRP-156673 -GO-RFQ / Purchase of Books Infrastructure Rehabilitation Request for Quota Single Stage - One E and Instructional Materials for IDA / 59880 and Service Delivery Restora Post Limited 300,000.00 288,756.81 Completed 2020-08-01 2021-02-09 2020-09-19 2021-04-05 2020-12-08 2021-05-06 tions nvelope Primary and Secondary in Mic tion & Improvement hika and Madagali LGAs of Ad amawa State NG-ADAMAWA MCRP-156648 Strengthening Peace Buildin -GO-RFQ / Supply of basic nec Request for Quota Single Stage - One E IDA / 59880 g, Stability and Social Cohesi Post Limited 150,000.00 131,597.00 Completed 2020-07-18 2020-09-29 2020-09-05 2020-11-05 2020-11-04 2020-11-28 essity packs for Children (to i tions nvelope on nclude nutrition packs) NG-ADAMAWA MCRP-156650 Strengthening Peace Buildin Request for Quota Single Stage - One E -GO-RFQ / Supply of agricult IDA / 59880 g, Stability and Social Cohesi Post Limited 250,000.00 230,730.26 Completed 2020-07-18 2020-06-29 2020-09-05 2020-07-26 2020-11-04 2020-08-26 tions nvelope ural livelihood support kits to on include Poultry NG-ADAMAWA MCRP-156279 Infrastructure Rehabilitation Request for Quota Single Stage - One E -GO-RFQ / Supply of Basic Liv IDA / 59880 and Service Delivery Restora Post Limited 300,000.00 278,829.27 Completed 2020-07-22 2020-11-11 2020-09-09 2020-12-24 2020-11-08 2020-12-24 tions nvelope elihood Kits tion & Improvement NG-ADAMAWA MCRP-100553 Strengthening Peace Buildin Request for Quota Single Stage - One E IDA / 59880 Post Limited 301,092.00 230,129.29 Completed 2018-11-03 2019-02-27 2018-12-29 2019-03-19 2019-06-27 2019-05-18 -GO-RFQ / Supply of Vegetabl g, Stability and Social Cohesi tions nvelope e Seeds on Page 6 NG-ADAMAWA MCRP-277809 Infrastructure Rehabilitation -GO-RFQ / Procurement of 3''i Request for Quota Single Stage - One E IDA / 66490 and Service Delivery Restora Post Limited 525,000.00 564,985.64 Completed 2022-03-30 2022-04-12 2022-04-25 2022-05-14 2022-06-04 2022-07-01 nch Solar Powered Water Pu tions nvelope tion & Improvement mps in Adamawa State. NG-ADAMAWA MCRP-278118 Infrastructure Rehabilitation Request for Quota Single Stage - One E -GO-RFQ / Equipping and Fur IDA / 66490 and Service Delivery Restora Post Limited 137,641.00 136,639.09 Completed 2022-03-20 2022-04-27 2022-04-15 2022-06-12 2022-05-25 2022-07-25 tions nvelope nishing of Gombi Vetinerary tion & Improvement Clinic NG-ADAMAWA MCRP-277783 Strengthening Peace Buildin -GO-RFQ / Procurement of lar Request for Quota Single Stage - One E IDA / 66490 g, Stability and Social Cohesi Post Limited 350,200.00 0.00 Completed 2022-05-03 2024-02-08 2022-05-29 2024-03-22 2022-07-18 2024-12-24 ge ruminant animals (Cattle) tions nvelope on in Adamawa State. NG-ADAMAWA MCRP-278112 -GO-RFQ / Procurement of Ch Strengthening Peace Buildin Request for Quota Single Stage - One E aff/Fodder Cutting machines t IDA / 66490 g, Stability and Social Cohesi Post Limited 100,626.00 0.00 Completed 2022-04-17 2023-08-28 2022-05-13 2023-09-29 2022-06-22 2024-03-28 tions nvelope o support cooperatives in fod on der to boost Animal feed. NG-ADAMAWA MCRP-277728 Strengthening Peace Buildin Request for Quota Single Stage - One E Under Imple -GO-RFQ / Procurement of fe IDA / 66490 g, Stability and Social Cohesi Post Limited 50,000.00 0.00 2022-04-17 2024-02-08 2022-05-17 2022-06-26 tions nvelope mentation eds for Large Ruminants. on NG-ADAMAWA MCRP-277803 Strengthening Peace Buildin Request for Quota Single Stage - One E -GO-RFQ / Procurement of Me IDA / 66490 g, Stability and Social Cohesi Post Limited 50,000.00 0.00 Signed 2022-04-17 2024-02-08 2022-05-13 2024-04-25 2022-06-12 tions nvelope dication for Large Ruminants on NG-ADAMAWA MCRP-278110 Strengthening Peace Buildin -GO-RFQ / Procurement of As Request for Quota Single Stage - One E IDA / 66490 g, Stability and Social Cohesi Post Limited 250,000.00 0.00 Completed 2022-04-04 2023-07-25 2022-04-30 2023-08-28 2022-06-09 2023-09-25 sorted Foundation Seeds to C tions nvelope on ommunity based Seed Produc tion clusters NG-ADAMAWA MCRP-278138 Strengthening Peace Buildin -GO-RFQ / Procurement of Inp Request for Quota Single Stage - One E IDA / 66490 g, Stability and Social Cohesi Post Limited 300,000.00 296,283.62 Completed 2022-06-11 2022-03-08 2022-07-07 2022-04-08 2022-08-16 2022-09-04 uts tools and Kits to identified tions nvelope on Cooperatives. (Dry and Rain F ed Season) NG-ADAMAWA MCRP-278028 -GO-RFQ / Procurement of Mi Strengthening Peace Buildin Request for Quota Single Stage - One E ni Oil Extraction machines for IDA / 66490 g, Stability and Social Cohesi Post Limited 150,000.00 0.00 Signed 2022-05-09 2022-08-24 2022-06-04 2022-09-30 2022-07-14 tions nvelope Groundnut oil/Soybean and S on esame Oil processing in Ada mawa State. NG-ADAMAWA MCRP-278332 -GO-RFQ / Procurement of Ha Infrastructure Rehabilitation Request for Quota Single Stage - One E nd held GIS and IDA / 66490 and Service Delivery Restora Post Limited 9,027.00 0.00 Canceled 2022-03-27 2022-05-10 2022-06-09 tions nvelope other equipments for collecti tion & Improvement on of Road Data NG-ADAMAWA MCRP-310559 Technical Assistance and Pro Request for Quota Single Stage - One E -GO-RFQ / Acs, Computers, La IDA / 66490 Post Limited 70,000.00 0.00 Completed 2022-09-02 2022-11-28 2022-09-28 2022-12-16 2022-11-07 2022-12-29 ject Management Support tions nvelope ptops, Printers, Photocopier NG-ADAMAWA MCRP-310555 Technical Assistance and Pro Request for Quota Single Stage - One E IDA / 66490 Post Limited 30,000.00 0.00 Signed 2022-09-02 2023-01-18 2022-09-29 2022-11-08 -GO-RFQ / Project Staff Furnit ject Management Support tions nvelope ure NG-ADAMAWA MCRP-310736 Technical Assistance and Pro Request for Quota Single Stage - One E -GO-RFQ / Fire Protective & Pr IDA / 66490 Post Limited 25,000.00 0.00 Completed 2022-09-07 2022-08-24 2022-10-02 2022-09-26 2022-11-11 2022-10-31 ject Management Support tions nvelope evention Equipments NG-ADAMAWA MCRP-310562 Technical Assistance and Pro Request for Quota Single Stage - One E IDA / 66490 Post Limited 40,000.00 0.00 Completed 2022-09-13 2022-11-28 2022-10-09 2022-12-16 2022-12-08 2023-03-08 -GO-RFQ / Purchase of Power ject Management Support tions nvelope Generator NG-ADAMAWA MCRP-310565 Infrastructure Rehabilitation Request for Quota Single Stage - One E -GO-RFQ / Furniture Supplies IDA / 66490 and Service Delivery Restora Post Limited 479,278.00 0.00 Completed 2022-09-13 2022-08-24 2022-10-10 2022-09-22 2023-01-28 2023-12-22 tions nvelope to 6 Schools (Secondary) Sch tion & Improvement ools NG-ADAMAWA MCRP-310733 Infrastructure Rehabilitation Request for Quota Single Stage - One E -GO-RFQ / Furniture Supplies IDA / 66490 and Service Delivery Restora Post Limited 959,278.00 0.00 Completed 2022-09-13 2022-08-24 2022-10-09 2022-09-22 2023-02-06 2023-12-22 tions nvelope to 6 Schools (Primary) tion & Improvement NG-ADAMAWA MCRP-320258 Strengthening Peace Buildin Request for Quota Single Stage - One E -GO-RFQ / Procurement of Saf IDA / 66490 g, Stability and Social Cohesi Post Limited 366,364.00 0.00 Completed 2022-10-31 2022-10-12 2022-11-26 2023-04-05 2023-01-25 2023-04-05 tions nvelope ety kits/work tools for LIPW b on eneficiaries NG-ADAMAWA MCRP-320257 Strengthening Peace Buildin -GO-RFQ / Provision of equip Request for Quota Single Stage - One E IDA / 66490 g, Stability and Social Cohesi Post Limited 200,000.00 0.00 Completed 2022-10-25 2022-10-12 2022-11-20 2022-11-02 2023-01-19 2022-12-09 ment and supplies to fish far tions nvelope on mer cooperatives NG-ADAMAWA MCRP-320243 Strengthening Peace Buildin -GO-RFQ / Procurement of Tu Request for Quota Single Stage - One E IDA / 66490 g, Stability and Social Cohesi Post Limited 30,000.00 0.00 Completed 2022-11-09 2023-01-10 2022-12-06 2023-02-10 2023-02-04 2023-03-08 be well drilling rigs to youth f tions nvelope on armer cooperative groups. NG-ADAMAWA MCRP-320240 -GO-RFQ / Procurement and d Strengthening Peace Buildin istribution of fodder seeds (Br Request for Quota Single Stage - One E IDA / 66490 g, Stability and Social Cohesi Post Limited 100,626.00 0.00 Completed 2022-11-11 2023-08-16 2022-12-07 2023-09-12 2023-02-05 2023-11-03 acharia, Lablab, Northern Ga tions nvelope on mba, Stylosanthes) to Animal Husbandry Cooperatives for li vestock farming. NG-ADAMAWA MCRP-320244 Strengthening Peace Buildin -GO-RFQ / Refurbishing and U Request for Quota Single Stage - One E Under Imple IDA / 66490 g, Stability and Social Cohesi Post Limited 135,000.00 0.00 2022-11-12 2022-12-11 2023-06-09 pgrade of Fufore Fish Hatcher tions nvelope mentation on y including brood stock and c onsumables NG-ADAMAWA MCRP-320261 Technical Assistance and Pro Request for Quota Single Stage - One E -GO-RFQ / Purchase of 2 Nos IDA / 66490 Post Limited 171,000.00 0.00 Completed 2022-11-22 2023-01-10 2022-12-21 2023-02-21 2023-02-19 2023-05-10 ject Management Support tions nvelope Hilux Pickup Vans NG-ADAMAWA MCRP-320265 -GO-RFQ / Strategic Communi Technical Assistance and Pro Request for Quota Single Stage - One E IDA / 66490 Post Limited 60,000.00 0.00 Completed 2022-11-22 2022-11-28 2022-12-18 2022-12-16 2023-02-16 2022-12-29 cations (Equipment Cameras, ject Management Support tions nvelope lights, Recorders) NG-ADAMAWA MCRP-277744 Infrastructure Rehabilitation Request for Quota Single Stage - One E -GO-RFQ / Supply of Books for IDA / 66490 and Service Delivery Restora Post Limited 247,235.00 0.00 Completed 2022-07-27 2022-11-28 2022-08-24 2022-12-20 2022-09-23 2023-02-08 tions nvelope Secondary Schools in Adama tion & Improvement wa State. NG-ADAMAWA MCRP-340384 Strengthening Peace Buildin -GO-RFQ / Provision of Brique Request for Quota Single Stage - One E IDA / 66490 g, Stability and Social Cohesi Post Limited 64,750.00 0.00 Completed 2023-02-21 2023-08-28 2023-03-22 2023-09-25 2023-05-21 2024-07-19 tte Making machines for valu tions nvelope on e addition in agricultural wast e NG-ADAMAWA MCRP-343071 Strengthening Peace Buildin -GO-RFQ / Supply of small ru Request for Quota Single Stage - One E IDA / 66490 g, Stability and Social Cohesi Post Limited 177,577.00 0.00 Signed 2023-03-21 2024-02-08 2023-04-18 2024-03-22 2023-06-17 minants as additional livestoc tions nvelope on k support to identified benefi ciary clusters Page 7 NG-ADAMAWA MCRP-343072 Strengthening Peace Buildin Request for Quota Single Stage - One E -GO-RFQ / Procurement of fee IDA / 66490 g, Stability and Social Cohesi Post Limited 100,000.00 0.00 Completed 2023-03-27 2024-02-08 2023-04-24 2024-04-25 2023-06-23 2024-09-04 tions nvelope ds and medications for small on ruminants NG-ADAMAWA MCRP-343077 Infrastructure Rehabilitation Request for Quota Single Stage - One E -GO-RFQ / Purchase of Classr IDA / 59880 and Service Delivery Restora Post Limited 495,082.00 0.00 Completed 2023-03-05 2023-02-28 2023-04-02 2023-04-05 2023-07-01 2023-09-29 tions nvelope oom Furniture tion & Improvement NG-ADAMAWA MCRP-343080 Infrastructure Rehabilitation -GO-RFQ / Supply of Instructi Request for Quota Single Stage - One E IDA / 66490 and Service Delivery Restora Post Limited 273,853.00 0.00 Completed 2023-03-20 2023-03-08 2023-04-16 2023-04-05 2023-06-15 2023-06-09 onal Materials to Primary and tions nvelope tion & Improvement Secondary Schools NG-ADAMAWA MCRP-343082 Infrastructure Rehabilitation Request for Quota Single Stage - One E -GO-RFQ / Supply of Laborato IDA / 66490 and Service Delivery Restora Post Limited 65,277.00 0.00 Completed 2023-03-25 2023-05-03 2023-04-21 2023-05-11 2023-05-21 2023-06-16 tions nvelope ry Euipment to Senior Second tion & Improvement ary Schools NG-ADAMAWA MCRP-343269 Infrastructure Rehabilitation Request for Quota Single Stage - One E -GO-RFQ / Supply of Medical IDA / 66490 and Service Delivery Restora Post Limited 200,000.00 0.00 Completed 2023-03-07 2023-03-08 2023-04-03 2023-04-06 2023-06-02 2023-05-11 tions nvelope Equipment to Rehabilitated P tion & Improvement HCs in 7 LGAs NG-ADAMAWA MCRP-343277 Infrastructure Rehabilitation Request for Quota Single Stage - One E -GO-RFQ / Supply of Furniture IDA / 66490 and Service Delivery Restora Post Limited 350,000.00 0.00 Completed 2023-03-13 2023-03-08 2023-04-09 2023-04-06 2023-07-08 2023-05-08 tions nvelope to rehabilitated Hospitals and tion & Improvement PHCCS NG-ADAMAWA MCRP-343424 Strengthening Peace Buildin -GO-RFQ / Rehabilitation of In Request for Quota Single Stage - One E IDA / 66490 g, Stability and Social Cohesi Post Limited 110,446.00 0.00 Completed 2023-03-11 2023-03-08 2023-04-07 2023-04-04 2023-08-05 2023-06-16 frastructure and Fencing of G tions nvelope on ombi Veterinary Clinic NG-ADAMAWA MCRP-340383 -GO-RFQ / Provision of Mini M Strengthening Peace Buildin Single Stage - One E echanized tools to farmer coo IDA / 66490 g, Stability and Social Cohesi Post Request for Bids Limited 630,138.00 0.00 Completed 2023-03-14 2023-06-12 2023-03-19 2023-06-19 2023-04-30 2023-07-03 2023-05-30 2023-07-07 2023-06-05 2023-07-17 2023-09-03 2023-09-15 nvelope peratives/groups (Hand Tiller on s, Harrows, Planters, Multi-Cr op Threshers etc) NG-ADAMAWA MCRP-343287 Strengthening Peace Buildin -GO-RFQ / Procurement of Sp Request for Quota Single Stage - One E IDA / 66490 g, Stability and Social Cohesi Post Limited 170,833.00 0.00 Completed 2023-03-15 2023-08-16 2023-04-11 2023-12-15 2023-06-10 2024-03-25 orting Equipment for the reha tions nvelope on bilitated sports centers and s chools NG-ADAMAWA MCRP-343069 Strengthening Peace Buildin -GO-RFQ / Provision of Compl Single Stage - One E IDA / 66490 g, Stability and Social Cohesi Post Request for Bids Limited 650,000.00 0.00 Completed 2023-03-15 2023-06-26 2023-03-20 2023-07-03 2023-04-10 2023-07-17 2023-04-24 2023-07-27 2023-05-01 2023-08-23 2023-10-28 2024-01-12 ete Set of Mini Rice processin nvelope on g equipment to Cooperative Clusters/User groups. NG-ADAMAWA MCRP-343275 -GO-RFQ / Supply of Essential Infrastructure Rehabilitation Drugs/Medical consumables t Request for Quota Single Stage - One E IDA / 66490 and Service Delivery Restora Post Limited 320,000.00 0.00 Completed 2023-03-07 2023-03-08 2023-04-03 2023-04-11 2023-06-02 2023-05-12 o Rehabilitated General Hospi tions nvelope tion & Improvement tals and PHCCs (based on the list of Essential Drugs by the FMoH & NPHCDA) NG-ADAMAWA MCRP-352804 Infrastructure Rehabilitation -GO-RFQ / Purchase of additio Request for Quota Single Stage - One E IDA / 66490 and Service Delivery Restora Post Limited 252,459.00 0.00 Completed 2023-04-10 2023-08-16 2023-05-11 2023-09-13 2023-07-10 2023-11-27 nal equipment for Trauma Ce tions nvelope tion & Improvement nter at Mubi General Hospital NG-ADAMAWA MCRP-352755 Infrastructure Rehabilitation -GO-RFB / Supply and Installa Single Stage - One E IDA / 66490 and Service Delivery Restora Post Request for Bids Open - National 400,000.00 0.00 Signed 2023-04-25 2023-06-24 2023-04-30 2023-11-16 2023-06-04 2023-12-05 2023-07-04 2024-02-07 2023-07-18 2024-02-07 2024-01-14 tion of Solar Inverter Systems nvelope tion & Improvement for Rehabilitated Hospitals an d PHCCs NG-ADAMAWA MCRP-365581 Strengthening Peace Buildin -GO-RFQ / Procurement of eq Request for Quota Single Stage - One E IDA / 66490 g, Stability and Social Cohesi Post Limited 79,565.00 0.00 Completed 2023-06-26 2023-06-19 2023-07-25 2023-07-17 2023-09-03 2023-08-30 uipment for upgrade of Adam tions nvelope on awa state cooperative admini stration system NG-ADAMAWA MCRP-310735 Technical Assistance and Pro Request for Quota Single Stage - One E -GO-RFQ / Procurement of Ele IDA / 66490 Post Limited 25,000.00 0.00 Canceled 2022-09-07 2022-10-03 2022-12-02 ject Management Support tions nvelope ctronic Document Manageme nt System NG-ADAMAWA MCRP-368197 -GO-RFQ / Procurement of Ha Infrastructure Rehabilitation Request for Quota Single Stage - One E rdware for Adamawa Road inf IDA / 66490 and Service Delivery Restora Post Limited 99,873.00 0.00 Signed 2023-07-24 2023-07-07 2023-08-21 2023-08-15 2023-09-30 tions nvelope ormation system to include c tion & Improvement apacity building and system design. NG-ADAMAWA MCRP-156665 Technical Assistance and Pro Request for Quota Single Stage - One E -GO-RFQ / Purchase of compu IDA / 59880 Post Limited 5,000.00 0.00 Canceled 2020-07-03 2020-08-08 2020-09-07 ject Management Support tions nvelope ters and other accessories for PCU NG-ADAMAWA MCRP-109693 Infrastructure Rehabilitation -GO-RFQ / Networking of Offic Request for Quota Single Stage - One E IDA / 59880 and Service Delivery Restora Post Limited 6,800.00 0.00 Canceled 2019-04-18 2019-05-06 2019-05-20 e Computer Systems, printers tions nvelope tion & Improvement and other accessories. NG-ADAMAWA MCRP-277793 -GO-RFQ / Procurement of Fo Strengthening Peace Buildin dder seeds (Bracharia, Lablab Request for Quota Single Stage - One E IDA / 66490 g, Stability and Social Cohesi Post Limited 100,626.00 0.00 Canceled 2022-04-25 2022-05-21 2022-06-30 , Northern Gamba, Stylosanth tions nvelope on es) to Animal Husbandry Coo peratives for livestock farmin g in Adamawa State. NG-ADAMAWA MCRP-397788 -GO-RFQ / Provision of Proces Strengthening Peace Buildin Request for Quota Single Stage - One E sing and Packaging Machines IDA / 66490 g, Stability and Social Cohesi Post Limited 200,000.00 0.00 Completed 2023-12-25 2024-02-20 2024-01-21 2024-03-25 2024-04-20 2024-07-18 tions nvelope for Cereals, Legumes, Fish, M on eat and Vegetable Products i n Adamawa State. NG-ADAMAWA MCRP-397586 Infrastructure Rehabilitation -GO-RFQ / Supply of Office Eq Request for Quota Single Stage - One E Under Imple IDA / 66490 and Service Delivery Restora Post Limited 41,677.78 0.00 2023-12-23 2024-02-20 2024-01-19 2024-03-19 uipment to rehabilitated 6 No tions nvelope mentation tion & Improvement s secondary schools (Exam O ffices) NG-ADAMAWA MCRP-320264 -GO-RFQ / Procurement of hig Strengthening Peace Buildin Request for Quota Single Stage - One E h volume solar irrigation pum IDA / 66490 g, Stability and Social Cohesi Post Limited 300,000.00 0.00 Canceled 2022-11-10 2022-12-06 2023-02-04 tions nvelope ps for the rehabilitated Irrigat on ion Project sites under 1.02 in 3 LGAs NG-ADAMAWA MCRP-419724 Infrastructure Rehabilitation -GO-RFQ / Supply and Installa Request for Quota Single Stage - One E IDA / 66490 and Service Delivery Restora Post Limited - National 50,000.00 0.00 Completed 2024-04-07 2024-05-21 2024-04-30 2024-05-31 2024-06-09 2024-07-26 tion of 30KVA Solar Inverter b tions nvelope tion & Improvement ackup system at Emir's Office Mubi. NG-ADAMAWA MCRP-419727 Infrastructure Rehabilitation -GO-RFQ / Equipping of Comp Request for Quota Single Stage - One E IDA / 66490 and Service Delivery Restora Post Limited - National 400,000.00 0.00 Signed 2024-04-09 2024-07-16 2024-05-04 2024-08-19 2024-07-03 uter Centers in two selected tions nvelope tion & Improvement Schools, complete with solar back up power. Page 8 NG-ADAMAWA MCRP-419729 -GO-RFQ / Supply and Brandi Infrastructure Rehabilitation Request for Quota Single Stage - One E ng of double Bunk Beds and IDA / 66490 and Service Delivery Restora Post Limited - National 300,000.00 0.00 Completed 2024-04-13 2024-05-07 2024-05-07 2024-05-16 2024-07-06 2024-07-30 tions nvelope Mattresses to selected Boardi tion & Improvement ngs Schools in Adamawa Stat e. NG-ADAMAWA MCRP-419730 Infrastructure Rehabilitation -GO-RFQ / Supply, installation Request for Quota Single Stage - One E IDA / 66490 and Service Delivery Restora Post Limited - National 470,000.00 0.00 Completed 2024-04-13 2024-04-30 2024-05-09 2024-05-31 2024-07-08 2024-07-19 & Branding of Medical equip tions nvelope tion & Improvement ment to PHCCs, Cottage and General Hospitals. NG-ADAMAWA MCRP-419755 -GO-RFQ / Supply and installa Infrastructure Rehabilitation Request for Quota Single Stage - One E tion of 20 HP solar transport IDA / 66490 and Service Delivery Restora Post Limited - National 68,181.82 0.00 Signed 2024-04-13 2024-04-30 2024-05-07 2024-05-27 2024-06-16 tions nvelope Pumps in Gombi and Pella Sm tion & Improvement all Towns Water Supply Sche mes. NG-ADAMAWA MCRP-419752 Strengthening Peace Buildin -GO-RFQ / Purchase and supp Request for Quota Single Stage - One E IDA / 66490 g, Stability and Social Cohesi Post Limited - National 250,000.00 0.00 Completed 2024-04-30 2024-07-30 2024-05-25 2024-08-24 2024-07-24 2024-12-05 ly of Farming and Workshop tions nvelope on Equipment to College of Agric ulture Ganye. NG-ADAMAWA MCRP-419742 -GO-RFQ / Purchase and supp Strengthening Peace Buildin Request for Quota Single Stage - One E ly of Life Jackets, Life Buoys a IDA / 66490 g, Stability and Social Cohesi Post Limited - National 200,000.00 0.00 Completed 2024-04-27 2024-04-30 2024-05-21 2024-05-28 2024-07-20 2024-09-04 tions nvelope nd Mini Boats for safety in flo on od ravaged communities. NG-ADAMAWA MCRP-419746 -GO-RFQ / Equiping and furnis Strengthening Peace Buildin Request for Quota Single Stage - One E hing of Peace Groups Offices IDA / 66490 g, Stability and Social Cohesi Post Limited - National 105,000.00 0.00 Completed 2024-04-27 2024-04-30 2024-05-21 2024-05-28 2024-07-10 2024-12-09 tions nvelope across 21 LGAs of Adamawa on State. (Local government Sec retariats NG-ADAMAWA MCRP-419739 -GO-RFQ / Provision of Equip Strengthening Peace Buildin ment, Furniture, including IT Request for Quota Single Stage - One E IDA / 66490 g, Stability and Social Cohesi Post Limited - National 200,000.00 0.00 Completed 2024-05-03 2024-06-27 2024-05-27 2024-08-09 2024-07-16 2024-12-09 Equipment to Ministry of Rec tions nvelope on onstruction, Rehabilitation, R eintegration, and Humanitari an Services. NG-ADAMAWA MCRP-419741 -GO-RFQ / Purchase of Additio Strengthening Peace Buildin nal Solar Powered Pumps to s Request for Quota Single Stage - One E IDA / 66490 g, Stability and Social Cohesi Post Limited - National 550,000.00 0.00 Completed 2024-04-30 2024-05-07 2024-05-24 2024-05-30 2024-07-23 2024-08-06 upport Dry Season farming (r tions nvelope on epurposed Establishment of c ommunity Seed Production cl usters) NG-ADAMAWA MCRP-419753 Infrastructure Rehabilitation -GO-RFQ / Purchase for Waste Request for Quota Single Stage - One E IDA / 59880 and Service Delivery Restora Post Limited - National 465,573.77 0.00 Signed 2024-04-29 2024-11-19 2024-05-23 2024-12-24 2024-07-22 disposal equipment in the ins tions nvelope tion & Improvement urgency affected LGAs in Ada mawa State. NG-ADAMAWA MCRP-445522 -GO-RFQ / Procurement of saf Strengthening Peace Buildin Request for Quota Single Stage - One E ety kits (safety boots, disinfe IDA / 66490 g, Stability and Social Cohesi Post Limited - National 30,000.00 0.00 Signed 2024-08-24 2024-12-04 2024-09-17 2024-12-24 2024-10-27 tions nvelope ctants & Face mask) for short on term cash for work program NG-ADAMAWA MCRP-447915 -GO-RFQ / Supply, installation Infrastructure Rehabilitation Request for Quota Single Stage - One E & Branding of Medical equip IDA / 66490 and Service Delivery Restora Post Limited - National 750,000.00 0.00 Completed 2024-09-09 2024-09-25 2024-10-07 2024-10-24 2024-12-06 2024-11-15 tions nvelope ment to 5 Secondary and 3 Pr tion & Improvement imary Health Care Facilities i n Adamawa State. NG-ADAMAWA MCRP-450090 -GO-RFQ / Procurement of eq Strengthening Peace Buildin Request for Quota Single Stage - One E uipment for Agric skills devel IDA / 66490 g, Stability and Social Cohesi Post Limited - National 100,000.00 0.00 Completed 2024-09-21 2024-07-23 2024-10-17 2024-08-26 2024-12-16 2024-11-12 tions nvelope opment center Damare Girei on LGA Adamawa State. NG-ADAMAWA MCRP-482621 -GO-RFQ / Procurement and I Strengthening Peace Buildin Request for Quota Single Stage - One E Pending Impl nstallation Solar Flood lights f IDA / 66490 g, Stability and Social Cohesi Post Limited - National 100,000.00 0.00 2025-03-23 2025-04-07 2025-05-07 tions nvelope ementation or Three Stadia (Numan LGA, on Hong LGA & Madagali LGA) NG-ADAMAWA MCRP-482632 -GO-RFQ / Installation of Dres sing room Furniture in 3 Stadi Strengthening Peace Buildin Request for Quota Single Stage - One E Pending Impl a in Numan, Hong and Michik IDA / 66490 g, Stability and Social Cohesi Post Limited - National 50,000.00 0.00 2025-03-24 2025-04-08 2025-05-08 tions nvelope ementation a LGAs, based on recommend on ation of the Ministry of Sports and the Nigerian National Lea gue System. NG-ADAMAWA MCRP-482654 -GO-RFQ / Procurement of Ad Technical Assistance and Pro Request for Quota Single Stage - One E Pending Impl IDA / 66490 Post Limited - National 29,000.00 0.00 2025-03-22 2025-04-05 2025-04-26 ditional Boardroom Chairs an ject Management Support tions nvelope ementation d Laptops for Staff NG-ADAMAWA MCRP-482641 Strengthening Peace Buildin -GO-RFQ / Procurement of An Request for Quota Single Stage - One E Pending Impl IDA / 66490 g, Stability and Social Cohesi Post Limited - National 40,000.00 0.00 2025-03-22 2025-04-06 2025-04-27 droid Phones/Tabloids for Ext tions nvelope ementation on ension Workers. NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-ADAMAWA MCRP-69795- Infrastructure Rehabilitation Request for Quota Single Stage - One E NC-RFQ / Door to Door Collect IDA / 59880 and Service Delivery Restora Post Limited 236,065.57 0.00 Canceled 2018-08-05 2018-09-30 2019-03-29 tions nvelope ion of Solid waste in 7 LGAs tion & Improvement NG-ADAMAWA MCRP-169475 -NC-RFQ / Production of Medi Technical Assistance and Pro Request for Quota Single Stage - One E IDA / 59880 Post Limited 40,000.00 0.00 Signed 2020-07-26 2024-02-08 2020-09-09 2024-04-08 2020-10-19 a Materials,Documentaries Jin ject Management Support tions nvelope gles,Billboards,Slots,Website NG-ADAMAWA MCRP-320259 Strengthening Peace Buildin -NC-RFQ / Procurement of Pa Request for Quota Single Stage - One E IDA / 66490 g, Stability and Social Cohesi Post Limited 155,495.00 0.00 Completed 2022-10-29 2023-04-26 2022-12-03 2023-07-07 2023-12-08 2024-11-04 yment Service Provider (PSP) tions nvelope on for LIPW Implementation NG-ADAMAWA MCRP-368201 Technical Assistance and Pro -NC-DIR / Procurement of Elec IDA / 66490 Post Direct Selection Direct - National 70,000.00 0.00 Signed 2023-07-14 2023-07-18 2023-07-19 2023-07-25 2023-08-02 2023-08-11 2023-10-31 ject Management Support tronic Document Managemen t System Page 9 NG-ADAMAWA MCRP-397563 Strengthening Peace Buildin -NC-RFQ / Establish Communi Request for Quota Single Stage - One E IDA / 66490 g, Stability and Social Cohesi Post Limited 87,638.89 0.00 Signed 2023-12-25 2024-02-20 2024-01-25 2024-03-28 2024-07-23 ty-based Economic Tree nurs tions nvelope on eries and woodlots (fuelwood and fruit trees) NG-ADAMAWA MCRP-445516 -NC-DIR / Procurement of Pay Strengthening Peace Buildin ment service provider (PSP) f IDA / 66490 g, Stability and Social Cohesi Post Direct Selection Direct - National 60,000.00 0.00 Signed 2024-08-22 2024-09-23 2024-08-25 2023-10-02 2024-09-13 2024-10-25 2025-04-11 or short term cash for work p on rogram implementation CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Techni Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes cal Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-ADAMAWA MCRP-59463- Infrastructure Rehabilitation Consultant Qualifi CS-CQS / Hygiene Promotion IDA / 59880 and Service Delivery Restora Post Open - National 85,677.59 0.00 Canceled 2018-08-10 2018-08-10 2018-08-10 2018-08-10 2018-08-10 2018-08-10 cation Selection Campaign tion & Improvement NG-ADAMAWA MCRP-69092- CS-CQS / Consultation for Sur Infrastructure Rehabilitation Consultant Qualifi Under Implement vey, Design and Supervision IDA / 59880 and Service Delivery Restora Post Open - National 284,494.58 0.00 2018-07-10 2018-07-03 2018-07-13 2018-07-19 2018-07-23 2018-07-27 2018-08-11 cation Selection ation of Health, Education and Publ tion & Improvement ic Buildings Projects under Co mponent 2 NG-ADAMAWA MCRP-69097- Infrastructure Rehabilitation CS-CQS / Consultancy for Sur Consultant Qualifi Under Implement IDA / 59880 and Service Delivery Restora Post Open - National 494,021.00 0.00 2018-07-11 2018-07-30 2018-07-13 2018-07-20 2018-07-23 2018-07-26 2018-08-16 vey, Design and Supervision cation Selection ation tion & Improvement of Roads Projects under Com ponent 2 NG-ADAMAWA MCRP-62277- Infrastructure Rehabilitation CS-CQS / consultancy for Proj Consultant Qualifi IDA / 59880 and Service Delivery Restora Post Open - National 221,705.04 0.00 Canceled 2018-07-02 2018-07-23 2018-09-05 2018-10-05 2018-11-09 2019-05-08 ect design and Supervision fo cation Selection tion & Improvement r Road Projects Under Compo nent 2. NG-ADAMAWA MCRP-62278- Infrastructure Rehabilitation CS-CQS / Consultancy For Pro Consultant Qualifi IDA / 59880 and Service Delivery Restora Post Open - National 150,787.69 0.00 Canceled 2018-07-30 2018-08-20 2018-10-03 2018-11-02 2018-12-07 2019-06-05 ject Design and Supervision F cation Selection tion & Improvement or Water Projects Under Com ponent 2. NG-ADAMAWA MCRP-62006- CS-CQS / Consultancy for proj Infrastructure Rehabilitation Consultant Qualifi ects design and supervision f IDA / 59880 and Service Delivery Restora Post Open - National 162,000.57 0.00 Canceled 2018-06-11 2018-07-02 2018-08-15 2018-09-14 2018-10-19 2019-04-17 cation Selection or Education, Health, and Pub tion & Improvement lic buildings Projects under C omponent 2. NG-ADAMAWA MCRP-60470- CS-CQS / Training of affected Strengthening Peace Buildin Consultant Qualifi Under Implement farmers to apply inputs and a IDA / 59880 g, Stability and Social Cohesi Post Open - National 167,213.00 0.00 2018-08-16 2019-08-02 2018-08-23 2018-09-20 2018-10-04 2018-10-21 2018-12-20 cation Selection ation ccess targeted agricultural va on lue chains and agribusiness skills NG-ADAMAWA MCRP-73882- Strengthening Peace Buildin Consultant Qualifi Under Implement CS-CQS / Provision of Speciali IDA / 59880 g, Stability and Social Cohesi Post Open - National 200,000.00 0.00 2018-08-14 2018-10-30 2018-08-28 2018-09-28 2018-10-16 2018-11-13 2019-04-22 cation Selection ation sed Psycho-social needs ass on essment NG-ADAMAWA MCRP-59454- Strengthening Peace Buildin CS-CQS / Consultancy for Lea Consultant Qualifi IDA / 59880 g, Stability and Social Cohesi Post Open - National 108,196.72 0.00 Completed 2018-02-05 2021-06-01 2018-02-05 2018-02-05 2022-08-16 2018-02-05 2022-08-29 2018-02-05 2022-09-07 2018-02-05 2023-06-05 dership Accountability and cation Selection on Transparency Training Progr amme NG-ADAMAWA MCRP-60475- Strengthening Peace Buildin CS-CQS / Capacity building of Consultant Qualifi IDA / 59880 g, Stability and Social Cohesi Post Open - National 108,196.72 0.00 Completed 2018-02-23 2021-05-05 2018-03-02 2024-02-09 2018-03-23 2021-11-09 2018-04-13 2021-11-22 2018-05-11 2021-12-01 2018-09-08 2023-03-31 LG Officers for economic plan cation Selection on ning and policy development NG-ADAMAWA MCRP-60855- CS-CQS / Capacity building o Strengthening Peace Buildin Consultant Qualifi f LG Officers for local govern IDA / 59880 g, Stability and Social Cohesi Post Open - National 108,196.72 0.00 Signed 2018-02-23 2021-05-05 2018-03-09 2024-01-24 2018-04-13 2023-07-26 2018-05-04 2021-08-10 2018-06-08 2021-09-01 2018-10-06 cation Selection ments on budget planning an on d execution, monitoring and r eporting NG-ADAMAWA MCRP-60956- CS-CQS / Capacity building o Strengthening Peace Buildin Consultant Qualifi f LG Officers for strategic co IDA / 59880 g, Stability and Social Cohesi Post Open - National 108,196.72 0.00 Completed 2018-03-19 2021-05-07 2018-04-02 2024-01-30 2018-05-07 2021-08-09 2018-05-28 2021-09-09 2018-07-02 2021-10-11 2018-10-30 2022-07-19 cation Selection mmunications (Legislative Ad on vocacy, Media relations, Stak eholder Management etc). NG-ADAMAWA MCRP-60852- Strengthening Peace Buildin Consultant Qualifi Under Implement CS-CQS / Capacity building fo IDA / 59880 g, Stability and Social Cohesi Post Open - National 108,196.72 0.00 2018-02-23 2021-05-05 2018-03-09 2018-04-13 2018-05-04 2018-06-08 2018-10-06 cation Selection ation r programme design and impl on ementation NG-ADAMAWA MCRP-60513- CS-CQS / Registration, Mappi Strengthening Peace Buildin Consultant Qualifi Under Implement ng and Profiling of all local go IDA / 59880 g, Stability and Social Cohesi Post Open - National 39,448.00 0.00 2018-02-23 2019-01-07 2018-03-16 2018-04-29 2018-05-29 2018-07-03 2018-12-30 cation Selection ation vernment structures and exis on ting capacities State Wide NG-ADAMAWA MCRP-73941- CS-CQS / Soft Skill Training/ r Strengthening Peace Buildin Consultant Qualifi Pending Impleme e-orientation on quick to Mar IDA / 59880 g, Stability and Social Cohesi Post Open - National 225,459.00 0.00 2018-08-19 2018-09-02 2018-09-23 2018-10-03 2018-10-20 2019-01-28 cation Selection ntation ket Trading, Training for Non on agricultural Kits (Refresher Tr aining Skill Upgrade) NG-ADAMAWA MCRP-60997- CS-CQS / Consultancy Service Strengthening Peace Buildin Consultant Qualifi Under Implement s For Refresher Training of Ex IDA / 59880 g, Stability and Social Cohesi Post Open - National 65,573.00 0.00 2018-08-22 2018-11-16 2018-08-29 2018-09-19 2018-10-03 2018-10-20 2019-01-28 cation Selection ation isting Extension Workers to s on upport Livelihoods Projects NG-ADAMAWA MCRP-69796- CS-CQS / Consultancy for Sen sitization, Community Mobiliz Strengthening Peace Buildin ation and formation of peace Consultant Qualifi IDA / 59880 g, Stability and Social Cohesi Prior Open - National 344,262.00 0.00 Canceled 2018-10-30 2019-06-27 2018-11-13 2018-12-11 2018-12-25 2019-01-11 2019-04-11 groups within 7 Communities cation Selection on (establishment of community platforms to discuss commun ity needs, grievances; and re dress mechanisms NG-ADAMAWA MCRP-69809- Strengthening Peace Buildin CS-CQS / Design and Implem Consultant Qualifi IDA / 59880 g, Stability and Social Cohesi Prior Open - National 344,262.00 0.00 Canceled 2018-10-29 2019-06-27 2018-11-05 2018-11-19 2018-11-26 2018-12-10 2019-04-09 entation of Adamawa State Ci cation Selection on vic Education Programe Page 10 NG-ADAMAWA MCRP-69806- CS-CQS / Sensitization and M Strengthening Peace Buildin obilisation Programs for Awar Consultant Qualifi IDA / 59880 g, Stability and Social Cohesi Prior Open - National 413,115.00 0.00 Canceled 2018-11-12 2018-11-26 2018-12-17 2018-12-31 2019-01-14 2019-05-14 eness against Stigmatization cation Selection on of Woman and Children assoc iated with armed groups. (1N o Consultancy) NG-ADAMAWA MCRP-69804- CS-CQS / Consultancy for Me diation and Alternate Dispute Strengthening Peace Buildin Consultant Qualifi Resolution Capacity Building IDA / 59880 g, Stability and Social Cohesi Prior Open - National 425,961.00 0.00 Canceled 2018-11-26 2018-12-03 2018-12-17 2018-12-24 2019-01-14 2019-04-14 cation Selection within the Community Leader on ship and Governance Structur es (3Nos Consultancies acros sthe state) NG-ADAMAWA MCRP-73883- CS-CQS / Provision of Speciali sed Psycho-social support th Strengthening Peace Buildin Consultant Qualifi rough group support, recreat IDA / 59880 g, Stability and Social Cohesi Prior Open - National 442,622.95 0.00 Canceled 2018-12-10 2018-12-17 2019-01-03 2019-01-10 2019-01-24 2019-05-04 cation Selection ional , customary and socializ on ation activities referrals etc r esponding to needs identifie d during the assessment. NG-ADAMAWA MCRP-81646- CS-CQS / Consultancy for Sur Infrastructure Rehabilitation Consultant Qualifi Under Implement vey, Design and Supervision IDA / 59880 and Service Delivery Restora Post Open - National 213,675.22 0.00 2018-10-23 2018-07-03 2018-10-30 2018-11-13 2018-11-20 2018-11-30 2019-01-14 cation Selection ation of boreholes, VIP Latrines and tion & Improvement Hygiene promotion Campaign NG-ADAMAWA MCRP-81653- CS-CQS / Consultancy for Sur Infrastructure Rehabilitation Consultant Qualifi Under Implement vey, Design and Supervision IDA / 59880 and Service Delivery Restora Post Open - National 264,879.81 0.00 2018-10-23 2018-11-06 2018-10-30 2018-11-13 2018-11-20 2018-12-02 2019-03-02 cation Selection ation of small towns water project tion & Improvement s Rehabilitation and upgrade . NG-ADAMAWA MCRP-101434 -CS-CQS / Train the Trainer/U ser Workshops (i.e. 2 per LGA Infrastructure Rehabilitation ) for VLOM (Village Level Ope Consultant Qualifi Under Implement IDA / 59880 and Service Delivery Restora Post Open - National 72,131.00 0.00 2018-03-19 2023-05-03 2018-04-09 2018-05-23 2018-06-22 2018-07-27 2019-01-23 ration and Maintenance) WAS cation Selection ation tion & Improvement HCOMS, (WASH Committees at LGA Level, WASH Units @ LGAs, VHPs (Voluntary Hygie ne Promoters) State/LGA Gov t Officials. NG-ADAMAWA MCRP-124899 -CS-CQS / Consultancy for Se nsitization, Community Mobili Strengthening Peace Buildin Consultant Qualifi Under Implement zation and formation of peac IDA / 59880 g, Stability and Social Cohesi Post Limited 290,000.00 0.00 2019-08-05 2019-08-02 2019-08-19 2019-09-02 2019-09-17 2020-03-15 cation Selection ation e groups and community plat on forms to discuss community needs, grievances; and redre ss mechanisms NG-ADAMAWA MCRP-124918 Strengthening Peace Buildin -CS-CQS / Design and Implem Consultant Qualifi Under Implement IDA / 59880 g, Stability and Social Cohesi Post Limited 300,000.00 0.00 2019-08-05 2019-08-02 2019-08-19 2019-08-29 2019-09-15 2020-03-13 entation of Adamawa State Ci cation Selection ation on vic Education Programe NG-ADAMAWA MCRP-124931 -CS-CQS / Sensitization and Strengthening Peace Buildin mobilisation programs for aw Consultant Qualifi IDA / 59880 g, Stability and Social Cohesi Post Limited 300,000.00 0.00 Canceled 2019-08-15 2018-11-08 2019-08-29 2019-09-12 2019-10-03 2020-03-31 areness against stigmatizatio cation Selection on n of women and children asso ciated with armed groups. NG-ADAMAWA MCRP-124938 -CS-CQS / Provision of Special ised Psycho-social support t Strengthening Peace Buildin Consultant Qualifi Under Implement hrough group support, recre IDA / 59880 g, Stability and Social Cohesi Post Limited 300,000.00 0.00 2019-09-11 2021-06-01 2019-09-25 2019-10-16 2019-11-06 2020-11-05 cation Selection ation ational , customary and socia on lization activities referrals etc responding to needs identifie d during the assessment. NG-ADAMAWA MCRP-124940 -CS-CQS / Consultancy for Me Strengthening Peace Buildin diation and Alternate Dispute Consultant Qualifi IDA / 59880 g, Stability and Social Cohesi Post Limited 300,000.00 0.00 Completed 2019-08-15 2020-09-01 2019-08-29 2024-09-03 2019-09-19 2020-12-04 2019-10-10 2020-12-19 2020-04-07 2021-08-16 Resolution Capacity Building cation Selection on within the Community Leader ship and Governance Structur es NG-ADAMAWA MCRP-177546 Infrastructure Rehabilitation -CS-CQS / Capacity Building o Consultant Qualifi IDA / 59880 and Service Delivery Restora Post Limited 150,000.00 0.00 Completed 2020-06-25 2021-05-18 2020-07-09 2021-07-05 2020-07-30 2021-08-10 2020-08-16 2021-09-01 2020-11-14 2022-02-28 f Public Sector Personnel on cation Selection tion & Improvement Disaster Recovery Planning & Coordination NG-ADAMAWA MCRP-177568 Infrastructure Rehabilitation Consultant Qualifi Under Implement -CS-CQS / Training of Health IDA / 59880 and Service Delivery Restora Post Limited 100,000.00 0.00 2020-09-10 2023-04-28 2020-09-24 2020-10-24 2020-11-28 2021-05-27 cation Selection ation Workers (50) tion & Improvement NG-ADAMAWA MCRP-156271 -CS-CQS / Consultancy Servic Infrastructure Rehabilitation Consultant Qualifi e for Survey, design and Sup IDA / 59880 and Service Delivery Restora Post Limited 100,000.00 0.00 Signed 2020-07-20 2020-08-19 2020-08-03 2020-08-26 2020-08-24 2020-10-19 2020-09-08 2020-11-02 2021-06-05 cation Selection ervision of Solar Powered Bo tion & Improvement reholes in Adamawa State.(W ater Sector) NG-ADAMAWA MCRP-277750 -CS-CQS / Design and Deploy Strengthening Peace Buildin ment of Platform/Software for Consultant Qualifi IDA / 66490 g, Stability and Social Cohesi Post Limited 50,000.00 0.00 Under Review 2022-04-04 2024-02-12 2022-04-18 2022-05-18 2022-06-22 2022-12-19 Monitoring performance of Be cation Selection on neficiaries of Agric. Livelihood Kits/Small Animals by Extens ion Workers NG-ADAMAWA MCRP-278334 -CS-CQS / Training of extensi Strengthening Peace Buildin Consultant Qualifi Under Implement on workers to support famer IDA / 66490 g, Stability and Social Cohesi Post Limited 180,000.00 0.00 2022-05-14 2022-05-28 2022-06-18 2022-07-23 2023-01-19 cation Selection ation s and Agribusiness Cooperati on ves in Adamawa State. NG-ADAMAWA MCRP-278333 -CS-CQS / Monitoring of Partic Strengthening Peace Buildin Consultant Qualifi Under Implement ipants and assessing the imp IDA / 66490 g, Stability and Social Cohesi Post Limited 50,000.00 0.00 2022-02-28 2022-06-25 2022-03-14 2022-04-04 2022-04-09 2022-06-08 cation Selection ation act of Alternative Dispute Res on olution Capacity Building un dertaken in 2020/21 NG-ADAMAWA MCRP-277789 -CS-CQS / Training of Social Strengthening Peace Buildin Welfare & Youth Workers/Co Consultant Qualifi IDA / 66490 g, Stability and Social Cohesi Post Limited 140,925.00 0.00 Signed 2022-05-10 2023-11-16 2022-05-24 2023-11-30 2022-06-14 2024-02-13 2022-06-19 2024-05-20 2022-07-29 mmunity/Religious leaders an cation Selection on d Women groups on Sexual a nd Gender Based Violence (S GBV) in Adamawa State. NG-ADAMAWA MCRP-177572 -CS-CQS / Consultancy Servic Infrastructure Rehabilitation es for Design of An Implemen Consultant Qualifi Under Implement IDA / 59880 and Service Delivery Restora Post Limited 250,000.00 0.00 2020-07-31 2020-09-10 2020-08-14 2020-09-01 2020-09-22 2021-03-21 tation Strategy for The Sustai cation Selection ation tion & Improvement nability and Functionality 0f C ommunity Wash Facilities in Adamawa State. Page 11 NG-ADAMAWA MCRP-277804 Strengthening Peace Buildin -CS-CQS / Targeting, Profiling Consultant Qualifi Under Implement IDA / 66490 g, Stability and Social Cohesi Post Limited 125,000.00 0.00 2022-02-28 2022-10-10 2022-03-14 2022-04-04 2022-04-09 2022-06-08 and Identification of Farmer a cation Selection ation on nd Agribusiness Cooperatives in Adamawa State. NG-ADAMAWA MCRP-278022 Strengthening Peace Buildin -CS-CQS / Assessment and up Consultant Qualifi IDA / 66490 g, Stability and Social Cohesi Post Limited 130,000.00 0.00 Canceled 2022-03-03 2022-03-17 2022-04-07 2022-04-12 2022-05-22 grade of Adamawa State Coo cation Selection on peratives Administration Syst em NG-ADAMAWA MCRP-60954- Infrastructure Rehabilitation Consultant Qualifi CS-CQS / Sensitization and M IDA / 59880 and Service Delivery Restora Post Open - National 183,606.56 0.00 Canceled 2018-06-15 2018-06-15 2018-06-15 2018-06-15 2018-06-15 2018-06-15 cation Selection obilisation for Health (Outrea tion & Improvement ch Programs) NG-ADAMAWA MCRP-60983- Infrastructure Rehabilitation Consultant Qualifi CS-CQS / Teacher Training on IDA / 59880 and Service Delivery Restora Post Limited 210,181.65 0.00 Canceled 2020-10-29 2020-11-12 2020-12-03 2020-12-20 2021-04-19 cation Selection Pedagogy ( Primary and Seco tion & Improvement ndary Schools ) NG-ADAMAWA MCRP-60850- Infrastructure Rehabilitation CS-CQS / Training of Commun Consultant Qualifi IDA / 59880 and Service Delivery Restora Post Open - National 68,852.46 0.00 Canceled 2018-09-10 2018-10-01 2018-11-14 2018-12-14 2019-01-18 2019-07-17 ity Health Workers (CHeWs) t cation Selection tion & Improvement o Staff Targeted Health Facilit ies NG-ADAMAWA MCRP-60949- Infrastructure Rehabilitation Consultant Qualifi CS-CQS / Mobilization and Se IDA / 59880 and Service Delivery Restora Post Limited 111,885.24 0.00 Canceled 2020-10-05 2020-10-19 2020-11-06 2020-11-23 2021-03-15 cation Selection nsitization for Children Educa tion & Improvement tion NG-ADAMAWA MCRP-156641 -CS-CQS / design and Supervi Infrastructure Rehabilitation Consultant Qualifi sion for Rehabilitation of Pri IDA / 59880 and Service Delivery Restora Post Limited 150,000.00 0.00 Canceled 2020-07-03 2020-07-17 2020-08-07 2020-08-24 2021-05-31 cation Selection mary and Secondary Schools tion & Improvement In Adamawa State.(Education Sector) NG-ADAMAWA MCRP-73939- CS-CQS / Capacity Building fo Strengthening Peace Buildin r Local Government Emergen Consultant Qualifi IDA / 59880 g, Stability and Social Cohesi Post Open - National 6,885.25 0.00 Canceled 2018-08-15 2018-08-29 2018-09-26 2018-10-10 2018-10-31 2019-02-28 cy Responders among Displa cation Selection on ced and Transitional Local Go vernment Officials per LGA NG-ADAMAWA MCRP-297160 -CS-CQS / CONSULTANCY SER VICES FOR DESIGN AND SUPE Infrastructure Rehabilitation RVISION OF REHABILITATION/ Consultant Qualifi IDA / 59880 and Service Delivery Restora Prior Limited 300,000.00 0.00 Under Review 2020-09-02 2020-09-16 2020-10-07 2020-10-17 2021-11-21 RENOVATION OF PUBLIC BUIL cation Selection tion & Improvement DINGS(SCHOOLS AND HEALT H FACILITIES) IN THE SEVEN ( 7) INSURGENCY AFFECTED L GAs IN ADAMAWA STATE. NG-ADAMAWA MCRP-312629 -CS-CQS / Consultancy For Fu Technical Assistance and Pro Consultant Qualifi Under Implement IDA / 66490 Post Limited 15,000.00 0.00 2022-08-31 2022-10-18 2022-09-07 2022-09-01 2022-09-28 2022-10-06 2022-11-15 nctional Review of Capacities ject Management Support cation Selection ation and Systems of PCU NG-ADAMAWA MCRP-320225 Strengthening Peace Buildin -CS-CQS / Procurement of LIP Consultant Qualifi IDA / 66490 g, Stability and Social Cohesi Post Limited 400,000.00 0.00 Completed 2022-10-25 2022-11-10 2022-11-08 2023-02-07 2022-11-29 2023-05-01 2022-12-07 2023-05-08 2024-01-31 2024-10-31 W Implementing Partner (IP) f cation Selection on or Beneficiary Targeting and process Management NG-ADAMAWA MCRP-320223 Infrastructure Rehabilitation Consultant Qualifi -CS-CQS / Consultancy for De IDA / 66490 and Service Delivery Restora Post Limited 100,000.00 0.00 Signed 2022-10-27 2022-12-23 2022-11-10 2022-12-26 2022-12-01 2023-01-16 2022-12-10 2023-02-01 2023-09-06 cation Selection sign and Supervision of Healt tion & Improvement h Facilities NG-ADAMAWA MCRP-320255 Infrastructure Rehabilitation -CS-CQS / Consultancy for the Consultant Qualifi IDA / 66490 and Service Delivery Restora Post Limited 288,525.00 0.00 Signed 2022-10-28 2022-12-23 2022-11-11 2022-12-07 2022-12-02 2023-01-16 2022-12-11 2023-02-01 2023-11-06 Survey, Design and Supervisi cation Selection tion & Improvement on of Schools Projects. NG-ADAMAWA MCRP-320252 -CS-CQS / Consultancy on stu Strengthening Peace Buildin dy to assess and redesign irri Consultant Qualifi IDA / 66490 g, Stability and Social Cohesi Post Limited 385,000.00 0.00 Completed 2022-11-10 2023-03-31 2022-11-24 2023-04-07 2022-12-15 2023-05-09 2022-12-24 2023-05-15 2023-11-19 2024-05-15 gations and the design and s cation Selection on upervision of infrastructure fa cilities under the livelhood inf rastructure Components. NG-ADAMAWA MCRP-321416 -CS-CQS / Consultancy Servic Strengthening Peace Buildin Consultant Qualifi e to assess and upgrade Ada IDA / 66490 g, Stability and Social Cohesi Post Limited 110,000.00 0.00 Completed 2022-10-24 2022-10-25 2022-11-07 2022-11-09 2022-11-28 2022-12-13 2022-12-05 2022-12-14 2023-03-05 2023-07-04 cation Selection mawa State Cooperatives Ad on ministration System. NG-ADAMAWA MCRP-297156 Infrastructure Rehabilitation -CS-CQS / Consultancy for sur Consultant Qualifi IDA / 66490 and Service Delivery Restora Post Limited 409,875.00 0.00 Canceled 2022-06-24 2022-07-08 2022-07-29 2022-08-08 2024-01-30 vey, design and supervision o cation Selection tion & Improvement f WASH Projects. NG-ADAMAWA MCRP-169392 -CS-CQS / Design and Deploy Strengthening Peace Buildin ment of Platform/Software for Consultant Qualifi IDA / 59880 g, Stability and Social Cohesi Post Limited 50,000.00 0.00 Canceled 2020-08-12 2020-08-26 2020-09-25 2020-10-30 2021-04-28 Monitoring performance of Be cation Selection on neficiaries of Agric. Livelihood Kits/Small Animals by Extens ion Workers NG-ADAMAWA MCRP-342539 Infrastructure Rehabilitation -CS-CQS / Consultancy for sur Consultant Qualifi IDA / 66490 and Service Delivery Restora Post Limited 266,418.75 0.00 Signed 2023-02-24 2023-04-26 2023-03-10 2023-04-03 2023-03-31 2023-05-12 2023-04-08 2023-05-18 2024-04-07 vey, design and supervision o cation Selection tion & Improvement f small towns/urban water su pply system NG-ADAMAWA MCRP-342533 Infrastructure Rehabilitation -CS-CQS / Consultancy for su Consultant Qualifi Under Implement IDA / 66490 and Service Delivery Restora Post Limited 143,456.25 0.00 2023-02-27 2023-01-09 2023-03-13 2023-04-03 2023-04-10 2023-10-07 pervision of boreholes (solar cation Selection ation tion & Improvement and Handpumps) in Adamaw a State NG-ADAMAWA MCRP-352798 -CS-CQS / Training on Buildin Strengthening Peace Buildin Consultant Qualifi g Public Private Partnerships IDA / 66490 g, Stability and Social Cohesi Post Limited 150,000.00 0.00 Completed 2023-04-03 2023-03-20 2023-04-17 2023-02-17 2023-05-08 2023-04-03 2023-05-18 2023-04-11 2023-06-17 2024-03-06 cation Selection and formulation of enabling p on olicies to drive SME growth in communities. NG-ADAMAWA MCRP-353342 -CS-CQS / ENGAGEMENT OF E Technical Assistance and Pro Consultant Qualifi XTERNAL AUDITOR TO AUDIT IDA / 66490 Post Limited 30,000.00 0.00 Canceled 2023-04-18 2023-05-02 2023-05-23 2023-05-31 2026-05-30 ject Management Support cation Selection WORLD BANK PROJECTS (MC RP) (FINANCIAL POSITION) NG-ADAMAWA MCRP-365577 Strengthening Peace Buildin -CS-CQS / Consultancy Servic Consultant Qualifi IDA / 66490 g, Stability and Social Cohesi Post Limited 250,250.00 0.00 Under Review 2023-06-13 2023-07-06 2023-06-27 2023-07-18 2023-07-30 2024-04-25 e for Survey, design and supe cation Selection on rvision of C1 Infrastructure Pr ojects. Page 12 NG-ADAMAWA MCRP-368189 Strengthening Peace Buildin -CS-CQS / Consultancy Servic Consultant Qualifi IDA / 66490 g, Stability and Social Cohesi Post Limited 85,000.00 0.00 Completed 2023-07-05 2023-07-06 2023-07-19 2023-07-20 2023-08-09 2023-09-08 2023-08-17 2023-09-18 2023-12-15 2024-03-27 e for training on strengthenin cation Selection on g M&E Capacity at LGA for Ke y MDAs NG-ADAMAWA MCRP-368195 -CS-CQS / Formation of Peace Strengthening Peace Buildin Consultant Qualifi Under Implement Groups in the remaining 14 L IDA / 66490 g, Stability and Social Cohesi Post Limited 300,000.00 0.00 2023-07-03 2023-06-06 2023-07-17 2023-07-19 2023-07-27 2023-10-25 cation Selection ation GAS and support for Peace gr on oup social cohesion activities NG-ADAMAWA MCRP-397557 -CS-CQS / Consultancy trainin Strengthening Peace Buildin Consultant Qualifi g for animal feed formulation IDA / 66490 g, Stability and Social Cohesi Post Limited 150,000.00 0.00 Under Review 2023-12-18 2024-03-07 2024-01-01 2024-01-22 2024-02-03 2024-06-02 cation Selection to support livestock cooperati on ves in Adamawa State NG-ADAMAWA MCRP-397560 -CS-CQS / Training (Training t Strengthening Peace Buildin Consultant Qualifi he trainer) of local Artisans o IDA / 66490 g, Stability and Social Cohesi Post Limited 91,666.67 0.00 Canceled 2023-12-18 2024-01-01 2024-01-22 2024-02-01 2024-05-01 cation Selection n repairs and fabrication of F on arm Tools, Equipment and Ma chinery. NG-ADAMAWA MCRP-398165 Infrastructure Rehabilitation Consultant Qualifi -CS-CQS / Training of Enginee IDA / 66490 and Service Delivery Restora Post Limited 49,936.61 0.00 Under Review 2023-12-21 2024-03-07 2024-01-04 2024-01-25 2024-01-30 2024-02-29 cation Selection rs on Alternative Building mat tion & Improvement erials. NG-ADAMAWA MCRP-398172 Infrastructure Rehabilitation Consultant Qualifi -CS-CQS / Training of Enginee IDA / 66490 and Service Delivery Restora Post Limited 49,936.61 0.00 Under Review 2023-12-28 2024-03-07 2024-01-11 2024-02-01 2024-02-06 2024-03-07 cation Selection rs on Computer Aided Design tion & Improvement Application NG-ADAMAWA MCRP-398186 Infrastructure Rehabilitation -CS-CQS / Capacity building f Consultant Qualifi IDA / 66490 and Service Delivery Restora Post Limited 83,333.33 0.00 Canceled 2023-12-28 2024-01-11 2024-02-01 2024-02-08 2024-04-08 or School based management cation Selection tion & Improvement committee (SBMC) members NG-ADAMAWA MCRP-398185 -CS-CQS / Training of Principa ls, Supervisors/Inspectors, He Infrastructure Rehabilitation Consultant Qualifi ad Teachers, Classroom Teac IDA / 66490 and Service Delivery Restora Post Limited 247,222.45 0.00 Under Review 2024-02-22 2024-03-07 2024-03-07 2024-03-28 2024-04-04 2024-06-03 cation Selection hers and LEA Staff on Educati tion & Improvement on Management and Informat ion System, supervision tech niques and content delivery. NG-ADAMAWA MCRP-417091 -CS-CQS / Capacity Building f or key Local Government Offi Strengthening Peace Buildin Consultant Qualifi cials and Private Sector Partic IDA / 66490 g, Stability and Social Cohesi Post Limited - National 200,000.00 0.00 Under Review 2024-03-29 2024-03-07 2024-04-12 2024-04-26 2024-05-07 2024-07-06 cation Selection ipants on designing and impl on ementing sustainable Agricult ure oriented policies and pro gramme NG-ADAMAWA MCRP-419757 Infrastructure Rehabilitation Consultant Qualifi Under Implement -CS-CQS / Consultancy for Wa IDA / 66490 and Service Delivery Restora Post Limited - National 80,000.00 0.00 2024-04-08 2024-07-30 2024-04-22 2024-05-13 2024-05-20 2024-12-16 cation Selection ation ter Projects Design and Super tion & Improvement vision NG-ADAMAWA MCRP-419771 -CS-CQS / Engage a consultan Strengthening Peace Buildin t to support in developing a s Consultant Qualifi IDA / 66490 g, Stability and Social Cohesi Post Limited - National 30,000.00 0.00 Under Review 2024-04-29 2024-08-21 2024-05-13 2024-06-03 2024-06-08 2024-07-18 trategic plan for the Ministry cation Selection on of Reconstruction, Rehabilitat ion, Reintegration, and Huma nitarian Services. NG-ADAMAWA MCRP-419773 Strengthening Peace Buildin Consultant Qualifi -CS-CQS / Design and Supervi IDA / 66490 g, Stability and Social Cohesi Post Limited - National 250,000.00 0.00 Under Review 2024-04-22 2024-03-19 2024-05-13 2024-06-03 2024-06-08 2024-12-05 cation Selection sion of Irrigation Scheme in A on damawa State NG-ADAMAWA MCRP-419768 Strengthening Peace Buildin -CS-CQS / Training of Agricult Consultant Qualifi IDA / 66490 g, Stability and Social Cohesi Post Limited - National 88,636.36 0.00 Canceled 2024-04-24 2024-05-08 2024-05-29 2024-06-04 2024-07-14 ural cooperatives on best pra cation Selection on ctice for sustainability. NG-ADAMAWA MCRP-419770 -CS-CQS / Conduct awareness Strengthening Peace Buildin campaigns on flood risks and Consultant Qualifi IDA / 66490 g, Stability and Social Cohesi Post Limited - National 40,000.00 0.00 Canceled 2024-04-19 2024-05-03 2024-05-24 2024-05-29 2024-07-08 mitigation measures in liaiso cation Selection on n with the Adamawa State E mergency Management Agen cy NG-ADAMAWA MCRP-460905 -CS-CQS / Sensitization and Strengthening Peace Buildin mobilization programs for aw Consultant Qualifi IDA / 66490 g, Stability and Social Cohesi Post Limited - National 200,000.00 0.00 Under Review 2024-11-14 2024-11-04 2024-11-21 2024-12-12 2024-12-19 2025-02-17 areness against stigmatizatio cation Selection on n of women and children asso ciated with armed groups. NG-ADAMAWA MCRP-482652 -CS-CQS / Procurement of Co nsultant to Undertake Waste Technical Assistance and Pro Consultant Qualifi Pending Impleme IDA / 66490 Post Limited - National 40,000.00 0.00 2025-03-20 2025-03-30 2025-04-06 2025-04-10 2025-05-10 Management System Assess ject Management Support cation Selection ntation ment in Yola-North, Yola-Sout h, Girei and Michika LGAs in Adamawa State. NG-ADAMAWA MCRP-482653 -CS-CQS / Procurement of Co Technical Assistance and Pro Consultant Qualifi Pending Impleme nsultant for Assessment of Tr IDA / 66490 Post Limited - National 40,000.00 0.00 2025-03-21 2025-03-31 2025-04-10 2025-04-14 2025-05-14 ject Management Support cation Selection ntation ansport management System in Adamawa State INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Con Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant tract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-ADAMAWA MCRP-74496- Infrastructure Rehabilitation Individual Consult CS-INDV / Hygiene Promotion IDA / 59880 and Service Delivery Restora Post Limited 9,180.33 0.00 Canceled 2018-08-20 2018-08-25 2018-09-08 2018-10-02 2019-01-30 ant Selection Sensitization/Mobilization. tion & Improvement NG-ADAMAWA MCRP-60989- CS-CQS / Verification/Validati Strengthening Peace Buildin on of Unified Registry and Be Under Implement IDA / 59880 g, Stability and Social Cohesi Post Direct Selection Direct 35,000.00 0.00 2018-12-10 2019-01-15 2018-12-13 2018-12-18 2019-01-17 neficiary Targeting for distrib ation on ution of interventions in Seve n Local Government Areas of Adamawa State. NG-ADAMAWA MCRP-109498 -CS-CDS / Procurement of Saf Infrastructure Rehabilitation eguards Consultants to produ IDA / 59880 and Service Delivery Restora Post Direct Selection Direct 100,000.00 0.00 Completed 2019-04-08 2019-07-29 2019-04-16 2019-08-01 2019-04-25 2019-08-21 2019-05-16 2020-02-19 ce ESMPs for Adamawa PCU I tion & Improvement nfrastructure projects. Page 13 NG-ADAMAWA MCRP-109506 -CS-CDS / Procurement of En Infrastructure Rehabilitation vironmental Safeguards Cons IDA / 59880 and Service Delivery Restora Post Direct Selection Direct 50,000.00 0.00 Signed 2019-04-08 2019-07-29 2019-04-16 2019-08-01 2019-04-25 2019-08-21 2019-05-16 ultants to produce ESIAs for A tion & Improvement damawa PCU Infrastructure p rojects. NG-ADAMAWA MCRP-109507 Infrastructure Rehabilitation -CS-CDS / Procurement of Saf IDA / 59880 and Service Delivery Restora Post Direct Selection Direct 80,000.00 0.00 Under Review 2019-04-08 2019-07-22 2019-04-16 2019-04-25 2019-05-16 eguards Consultants to produ tion & Improvement ce RAP for Adamawa PCU Infr astructure projects. NG-ADAMAWA MCRP-130455 -CS-CDS / consultancy servic Strengthening Peace Buildin es for beneficiary targeting f Under Implement IDA / 59880 g, Stability and Social Cohesi Post Direct Selection Direct 30,200.00 0.00 2019-09-04 2018-10-09 2019-09-14 2019-10-02 2019-11-01 or livelihood support interve ation on ntions in the seven affected L ocal government Areas of Ad amawa State. NG-ADAMAWA MCRP-169440 -CS-CDS / Training of Farmers Strengthening Peace Buildin Under Implement to apply inputs and access ta IDA / 59880 g, Stability and Social Cohesi Post Direct Selection Direct 100,000.00 0.00 2020-07-22 2021-07-05 2020-08-01 2020-09-08 2021-01-06 ation rgeted argricultural value cha on in and agribusiness skills NG-ADAMAWA MCRP-177554 Infrastructure Rehabilitation -CS-CDS / Consultancy for de IDA / 59880 and Service Delivery Restora Post Direct Selection Direct 170,000.00 0.00 Signed 2020-07-14 2020-09-11 2020-07-24 2020-10-15 2020-08-24 2020-12-21 2021-07-26 sign and supervision of Road tion & Improvement and bridge projects NG-ADAMAWA MCRP-156624 Infrastructure Rehabilitation -CS-CDS / Consultancy for Pre IDA / 59880 and Service Delivery Restora Post Direct Selection Direct 250,000.00 0.00 Completed 2020-07-02 2020-10-05 2020-07-12 2020-10-12 2020-08-07 2021-01-06 2020-10-06 2021-07-14 paration of Environmental an tion & Improvement d Social Safeguard Instrumen ts NG-ADAMAWA MCRP-177550 Strengthening Peace Buildin -CS-CDS / Beneficiary List Ver IDA / 59880 g, Stability and Social Cohesi Post Direct Selection Direct 20,000.00 0.00 Canceled 2020-06-25 2020-07-05 2020-08-21 2020-10-20 ification and Targeting on NG-ADAMAWA MCRP-177409 -CS-CDS / Consultancy for Pr Infrastructure Rehabilitation oduction of Engineering drawi IDA / 59880 and Service Delivery Restora Post Direct Selection Direct 150,000.00 0.00 Canceled 2020-07-09 2020-07-19 2020-08-24 2021-05-21 ngs design and supervision of tion & Improvement Contracts for Primary & Seco ndary schools. NG-ADAMAWA MCRP-169437 Strengthening Peace Buildin -CS-CDS / Soft skills training/o IDA / 59880 g, Stability and Social Cohesi Post Direct Selection Direct 100,000.00 0.00 Canceled 2020-09-30 2020-10-10 2020-11-12 2021-03-12 rientation on Quick to market on trading NG-ADAMAWA MCRP-177416 Strengthening Peace Buildin -CS-CDS / Softskills Training o IDA / 59880 g, Stability and Social Cohesi Post Direct Selection Direct 150,000.00 0.00 Canceled 2020-06-22 2020-07-02 2020-08-09 2020-12-07 n Quick to Market Trades on NG-ADAMAWA MCRP-277802 -CS-CDS / Design and implem entation of Mediation and Alt Strengthening Peace Buildin ernate Dispute Resolution for IDA / 66490 g, Stability and Social Cohesi Post Direct Selection Direct 300,000.00 0.00 Signed 2022-04-21 2023-05-22 2022-05-01 2023-05-16 2022-05-27 2023-06-20 2022-07-26 Community Leaders, Justice on Officials, Religious Leaders, C ommunity Peace Groups (2nd Phase) NG-ADAMAWA MCRP-277752 -CS-CDS / Procurement of Co Infrastructure Rehabilitation nsultant for Development IDA / 66490 and Service Delivery Restora Post Direct Selection Direct 230,000.00 0.00 Signed 2022-03-22 2022-06-27 2022-04-01 2022-07-04 2022-04-16 2022-08-15 2022-06-15 of Environmental and social tion & Improvement safeguards instruments NG-ADAMAWA MCRP-223567 Strengthening Peace Buildin -CS-CDS / Consultancy servic Under Implement IDA / 59880 g, Stability and Social Cohesi Post Direct Selection Direct 250,000.00 0.00 2020-12-02 2020-12-02 2020-12-12 2021-02-06 2021-04-27 e for soft skill training and re- ation on orientation on quick to marke t trading (2020) NG-ADAMAWA MCRP-278141 Infrastructure Rehabilitation -CS-CDS / Assessment of the IDA / 66490 and Service Delivery Restora Post Direct Selection Direct 125,000.00 0.00 Under Review 2022-03-08 2023-02-06 2022-03-18 2022-04-15 2022-06-14 Adamawa State Hides/Skin/Le tion & Improvement ather Value Chain NG-ADAMAWA MCRP-297159 -CS-CDS / Procurement of Co Infrastructure Rehabilitation nsultant for survey, IDA / 59880 and Service Delivery Restora Post Direct Selection Direct 260,000.00 0.00 Completed 2022-05-31 2022-10-06 2022-06-10 2022-08-09 2022-07-03 2022-10-12 2023-08-07 2023-05-05 Design and supervision of Ro tion & Improvement ads and Bridges. NG-ADAMAWA MCRP-177548 Infrastructure Rehabilitation -CS-CDS / Consultancy for w IDA / 59880 and Service Delivery Restora Post Direct Selection Direct 50,000.00 0.00 Canceled 2020-07-20 2020-07-30 2020-09-07 2021-03-06 ater projects Design and sup tion & Improvement ervision (Solar and Hand Pum p Boreholes) NG-ADAMAWA MCRP-356127 Infrastructure Rehabilitation -CS-CDS / Consultancy for pre Pending Impleme IDA / 66490 and Service Delivery Restora Post Direct Selection Direct - National 150,000.00 0.00 2023-04-20 2023-04-30 2023-05-27 2023-07-26 paration of Safeguards Instru ntation tion & Improvement ments for Component 1 Infra structure activities NG-ADAMAWA MCRP-356143 Infrastructure Rehabilitation -CS-CDS / Consultancy for su IDA / 66490 and Service Delivery Restora Post Direct Selection Direct - National 404,909.90 0.00 Under Review 2023-04-25 2023-07-10 2023-05-05 2023-06-01 2024-05-26 pervision of Roads and bridge tion & Improvement in Adamawa State (AF) NG-ADAMAWA MCRP-422994 -CS-CDS / Training (Training t Strengthening Peace Buildin he trainer) of local Artisans o IDA / 66490 g, Stability and Social Cohesi Post Direct Selection Direct - National 91,666.67 0.00 Under Review 2024-04-30 2024-04-18 2024-05-10 2024-06-06 2024-07-06 n repairs and fabrication of F on arm Tools, Equipment and Ma chinery. NG-ADAMAWA MCRP-447932 Infrastructure Rehabilitation -CS-CDS / Consultancy for su IDA / 66490 and Service Delivery Restora Post Direct Selection Direct - National 130,000.00 0.00 Under Review 2024-09-16 2024-08-26 2024-09-26 2024-10-16 2025-04-14 pervision of additional Road p tion & Improvement rojects in Adamawa State NG-ADAMAWA MCRP-445512 -CS-CDS / Procurement of con Strengthening Peace Buildin sultant for beneficiary targeti IDA / 66490 g, Stability and Social Cohesi Post Direct Selection Direct - National 140,000.00 0.00 Under Review 2024-08-21 2024-07-17 2024-08-29 2024-09-18 2025-03-17 ng and process management on for short-term cash for work p rogram Page 14