FOREST CONSERVATION AND SUSTAINABILITY IN THE HEART OF THE COLOMBIAN AMAZON PROJECT – TF018478 PROCUREMENT PLAN I. General 1. Bank’s approval Date of the procurement Plan 2. Date of General Procurement Notice: Dec 09, 2015 3. Period covered by this procurement plan: Until Dec 31, 2017 July 9, 2010 PROCUREMENT Colombia : Forest Conservation and Sustainability in the Heart of the Colombian Amazon PLAN General Information Country: Colombia 2017-08-0 Bank’s Approval Date of the Original Procurement Plan: 2025-03-1 4 if none) Revised Plan Date(s): (comma delineated, leave blank Project ID: P144271 GPN Date: 2 Project Name: Forest Conservation and Sustainability in the Heart of the Colombian Amazon Loan / Credit No: TF / 18478, TF / A5789, TF / B1287, TF / B5182 NATURAL HERITAGE FUND FOR BIODIVERSITY AND AREAS Executing Agency(ies): WORKS Activity Reference No Procuremen Estimate Actual Draft Bidding Doc Specific Procureme Proposal Submissio Bid Evaluation Rep Loan / Credit Market Appro Procurement Prequalificati High SEA/S Process Draft Pre-qualificati Prequalification Ev Bidding Documents Contract Comp . / Description Component Review Type Method t Document d Amou Amount ument / Justificatio nt Notice / Invitatio n / Opening / Minut ort and Recommen Signed Contract No. ach Process on (Y/N) H Risk Status on Documents aluation Report as Issued letion Type nt (US$) (US$) n n es dation for Award Planne Actual Planne Actual Planne Actual Planne Actual Planne Actual Planne Actual Planne Actual Planne Actual Planne d d d d d d d d d CO-PNF-18003-CW-DIR / C Component 1 - Protected Adquisición dire 27,614.4 Finalizad 2017-06- 2017-06- 2017-07- 2017-06- 2017-12 onstrucción Cabaña - Punto TF / 18478 Areas Management and Fi Posterior Direct 29,200.00 cta 8 o 13 27 18 10 -30 de Control en el PNNSCH - nancial Sustainability Sector el Guamo CO-PNF-17813-CW-RFB / C Component 1 - Protected onstrucción de un modulo Solicitud de coti Single Stage - On 208,929.0 181,366. Finalizad 2018-01- 2018-02- 2018-04- 2018-09 TF / 18478 Areas Management and Fi Posterior Limited del centro de investigación zaciones e Envelope 0 41 o 15 20 09 -28 nancial Sustainability ubicado en Puerto Abeja - P NN Chiribiquete CO-PNF-31996-CW-RFB / A decuación Sede Regional d Component 1 - Protected Solicitud de coti Single Stage - On 123,963.0 Cancelad 2017-11- 2018-01- 2018-07 e San José del Guaviare (Se TF / 18478 Areas Management and Fi Posterior Limited 0.00 zaciones e Envelope 0 o 25 20 -19 excluye el tramite de licenc nancial Sustainability ia de demolición y construc ción, estimadas en USD1.5 000) CO-PNF-395429-CW-RFQ / Contratar la construcción d e una unidad de alojamient Component 2 - Forest Gov Otro (con camp o y áreas complementarías Solicitud de coti Single Stage - On Cancelad 2024-01- 2024-02- 2024-07 TF / B5182 ernance, Management and Posterior Open - National o para explicaci 83,732.77 0.00 para el fortalecimiento del zaciones e Envelope o 08 18 -17 Monitoring ón) Centro Experimental Amaz ónico – CEA ubicado en el municipio de Mocoa, depar tamento del Putumayo. CO-PNF-400701-CW-RFQ / Realizar la adecuación y m antenimiento de las instala Component 2 - Forest Gov Otro (con camp ciones del auditorio “Rafael Solicitud de coti Single Stage - On 2024-04- 2024-05- 2024-08- 2024-07 TF / B5182 ernance, Management and Posterior Open - National o para explicaci 23,192.34 0.00 Firmado Rodríguez” para el fortaleci zaciones e Envelope 08 10 05 -09 Monitoring ón) miento institucional y el cor recto funcionamiento de la s instalaciones físicas de la corporación CDA en la secc ional Guaviare. GOODS Activity Reference No Estimated A Draft Bidding Doc Specific Procureme Proposal Submissio Bid Evaluation Rep Loan / Credit Market Appro Procurement Prequalificati Actual Amou Process Draft Pre-qualificati Prequalification Ev Bidding Documents Contract Completio . / Description Component Review Type Method mount (US$ ument / Justificatio nt Notice / Invitatio n / Opening / Minut ort and Recommen Signed Contract No. ach Process on (Y/N) nt (US$) Status on Documents aluation Report as Issued n ) n n es dation for Award Planne Actual Planne Actual Planne Actual Planne Actual Planne Actual Planne Actual Planne Actual Planne Actual Planne Actual d d d d d d d d d CO-PNF-17981-GO-RFQ / C Component 2 - Forest Gov Solicitud de coti Single Stage - On 2017-03- 2017-05- 2017-06- 2017-12- 2017-08- TF / 18478 Posterior Limited 21,482.00 11,124.04 Finalizado ompra motores fuera de bo ernance, Management and zaciones e Envelope 17 24 08 20 13 rda PPI - 2017 Monitoring CO-PNF-17822-GO-RFQ / D Component 2 - Forest Gov C-compra de hadware y sof Solicitud de coti Single Stage - On 2017-08- 2017-09- 2018-05- 2017-10- 2018-07- TF / 18478 ernance, Management and Posterior Limited 88,889.00 92,226.96 Finalizado tware CDS, para el fortaleci zaciones e Envelope 08 13 20 31 03 Monitoring miento del sistema de infor mación ambiental CO-PNF-31988-GO-DIR / A Component 2 - Forest Gov Adquisición dire 2016-12- 2016-12- 2017-01- 2017-02- 2017-12- 2019-01- dquisicion Imágenes de SR, TF / 18478 ernance, Management and Posterior Direct 62,963.00 57,631.70 Finalizado cta 15 16 19 07 20 17 equipos, software Monitoring CO-PNF-54228-GO-RFQ / a Component 2 - Forest Gov Solicitud de coti Single Stage - On 2018-04- 2018-05- 2018-06- 2018-07- 2018-09- 2018-07- TF / 18478 Posterior Limited 150.00 123.46 Finalizado dquisición de un GPS ernance, Management and zaciones e Envelope 30 16 11 03 26 03 Monitoring CO-PNF-54329-GO-RFQ / A Component 2 - Forest Gov dquisición de 250 cajas par Solicitud de coti Single Stage - On 2018-04- 2018-04- 2018-06- 2018-05- 2018-12- 2018-07- TF / 18478 ernance, Management and Posterior Limited 8,570.00 8,368.56 Finalizado a muestras de 25 x 10 x 5 zaciones e Envelope 30 02 12 02 31 31 Monitoring cms con tapa, en madera. CO-PNF-66548-GO-RFQ / A DQUISICIÓN DE EQUIPOS C Component 2 - Forest Gov ÓMPUTO Y PERIFERICOS PA Solicitud de coti Single Stage - On 2018-07- 2018-08- 2018-09- 2018-10- 2018-11- TF / 18478 ernance, Management and Posterior Open - National 88,889.00 48,183.51 Finalizado RA FORTALECIMIENTO DEL zaciones e Envelope 03 16 05 18 05 Monitoring SIG. CORPORACIÓN PARA E L DESARROLLO SOSTENIBL E DEL NORTE Y ORIENTE A MAZÓNICO - CDA CO-PNF-41763-GO-RFQ / A Component 3 - Sectoral Pr dquisición de imágenes de Solicitud de coti Single Stage - On 2018-01- 2018-03- 2018-09- TF / 18478 ograms for Sustainable La Posterior Limited 53,571.00 0.00 Cancelado sensores remotos (imagine zaciones e Envelope 28 25 21 ndscape Management s satélitales, fotógrafas aér eas, radar y drones) CO-PNF-54230-GO-RFQ / R Component 2 - Forest Gov Solicitud de coti Single Stage - On 2018-05- 2018-06- 2018-10- TF / 18478 Posterior Limited 2,150.00 0.00 Cancelado adio y antena para el Rdo ernance, Management and zaciones e Envelope 01 19 30 Mirití Monitoring CO-PNF-17798-GO-RFQ / A Component 1 - Protected dquisición e instalación de Solicitud de coti Single Stage - On 2017-07- 2017-09- 2017-10- TF / 18478 Areas Management and Fi Posterior Limited 5,556.00 0.00 Cancelado equipos para garantizar la r zaciones e Envelope 26 06 06 nancial Sustainability adiocomunicación de las N uevas sedes del PNNSCH CO-PNF-17807-GO-RFQ / A Component 2 - Forest Gov Solicitud de coti Single Stage - On 2017-08- 2017-09- 2017-12- dquisición Equipos y Softw TF / 18478 ernance, Management and Posterior Limited 6,926.00 0.00 Cancelado zaciones e Envelope 01 06 05 are - 2017 - IDEAM Monitoring CO-PNF-38838-GO-RFQ / C Component 2 - Forest Gov Solicitud de coti Single Stage - On 2018-01- 2018-03- 2018-09- omputadores portátiles, gr TF / 18478 ernance, Management and Posterior Limited 6,071.00 0.00 Cancelado zaciones e Envelope 20 17 13 abadoras de voz y cámaras Monitoring CO-PNF-66788-GO-DIR / A dquisición de imágenes sat elitales de muy alta resoluc ión de las constelaciones Pl Component 3 - Sectoral Pr Adquisición dire 2018-07- 2018-07- 2018-08- 2018-08- 2019-08- 2019-08- anetScope, DigitalGlobe, S TF / 18478 ograms for Sustainable La Posterior Direct 51,724.00 47,379.00 Finalizado cta 16 21 27 22 26 21 kySat y/o RapidEye hasta q ndscape Management ue se complete el valor tot al definido en este contrato , con un precio unitario por km2 y por tipo de imagen d e acuerdo CO-PNF-75475-GO-CP / Ad quisición de muebles para l Component 2 - Forest Gov Prácticas comer Single Stage - On 2018-09- 2018-09- 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2018-12- a exibición de las coleccion TF / 18478 ernance, Management and Posterior Limited 6,071.00 5,398.18 Finalizado ciales e Envelope 20 25 12 18 01 06 31 08 es de madera con usos ped Monitoring agogicos en diferentes regi ones del país CO-PNF-78398-GO-CP / 5 k Component 1 - Protected it campo: Carpa, aislante, e Prácticas comer Single Stage - On 2018-10- 2019-03- 2018-10- 2018-11- 2019-04- 2018-11- 2019-04- 2018-11- 2019-05- 2019-01- 2019-06- TF / 18478 Areas Management and Fi Posterior Open - National 3,571.00 3,586.43 Finalizado stufa, linterna, morral, cant ciales e Envelope 18 26 23 08 08 15 23 27 06 31 20 nancial Sustainability implora, PNN Alto Fragua y SFFPMOIA. CO-PNF-78409-GO-RFQ / A dquisición de Bote y motor fuera de borda para 12 per sonas con Equipo de Salva Component 3 - Sectoral Pr Solicitud de coti Single Stage - On 2018-10- 2018-11- 2019-04- 2019-01- 2019-06- mento para apoyar las acti TF / A5789 ograms for Sustainable La Posterior Open - National 18,000.00 14,376.96 Finalizado zaciones e Envelope 16 27 10 28 28 vidades de implementación ndscape Management de los acuerdos de conserv ación, restauración y no de forestación, en el departam ento de Caquetá - CORPOA MAZONIA CO-PNF-81065-GO-CP / Ad quisición de reactivos para el procesamiento de muest Component 2 - Forest Gov ras biológicas de peces, sa Prácticas comer Single Stage - On 2018-10- 2018-11- 2018-10- 2018-11- 2018-12- 2018-11- 2019-01- 2018-12- 2019-01- 2019-01- 2019-02- TF / 18478 ernance, Management and Posterior Open - National 7,143.00 6,782.39 Finalizado ngre y cabello (125 muestr ciales e Envelope 25 11 30 15 06 21 09 06 23 16 18 Monitoring as de pecese para ser anali zadas, 200 muestras de sa ngre y 200 muestras de ca bello), para detectar la pre sencia de mercurio CO-PNF-78414-GO-CP / Ad Component 3 - Sectoral Pr quisición de 3 motocicletas Prácticas comer Single Stage - On 2018-11- 2018-10- 2018-11- 2018-12- 2018-12- 2018-12- 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- TF / A5789 ograms for Sustainable La Posterior Open - National 12,857.00 6,458.76 Finalizado (4 tiempos, cilindraje 125cc ciales e Envelope 15 17 20 11 05 18 15 03 09 08 23 ndscape Management , encendido eléctrico y ped al - CDA. CO-PNF-78379-GO-RFQ / A DQUISICIÓN DE COMPUTAD ORES PORTATILES, DE MES Component 1 - Protected A, UPS, DISCOS DUROS EXT Solicitud de coti Single Stage - On 2018-11- 2019-01- 2019-02- 2019-03- 2019-04- TF / 18478 Areas Management and Fi Posterior Open - National 35,000.00 28,504.48 Finalizado ERNOS Y UN VIDEO BEAM Y zaciones e Envelope 27 12 18 15 18 nancial Sustainability OTROS ELEMENTOS (CAMA RAS TV) -PNN PARA CHIBIRI QUETE, LA PAYA Y ALTO FR AGUA, ACILAP Y CHURUMB ELOS CO-PNF-78388-GO-CP / AD Component 1 - Protected Prácticas comer Single Stage - On 2018-11- 2019-03- 2018-11- 2018-12- 2019-03- 2018-12- 2019-04- 2018-12- 2019-04- 2019-02- 2019-07- QUISICIÓN DE 2 MOTOCICL TF / 18478 Areas Management and Fi Posterior Open - National 7,143.00 5,783.92 Finalizado ciales e Envelope 15 13 20 11 29 18 02 26 25 28 05 ETAS PNN ALTO FRAGUA nancial Sustainability CO-PNF-81083-GO-CP / Sta Component 2 - Forest Gov Prácticas comer Single Stage - On 2018-11- 2019-02- 2018-11- 2018-12- 2019-03- 2018-12- 2019-03- 2019-01- 2019-03- 2019-03- 2019-06- nd para la conservación de TF / 18478 ernance, Management and Posterior Open - National 5,357.00 1,757.46 Finalizado ciales e Envelope 22 20 27 13 05 20 13 03 29 05 16 las muestras de madera Monitoring CO-PNF-85470-GO-RFQ / A Component 2 - Forest Gov dquisición de sillas y muebl Solicitud de coti Single Stage - On 2018-11- 2019-01- 2019-04- 2019-03- 2019-06- TF / 18478 ernance, Management and Posterior Open - National 18,929.00 15,211.10 Finalizado es para las salas de reunio zaciones e Envelope 27 22 18 30 23 Monitoring nes, salas de juntas y audit orio en CORPOAMAZONIA. CO-PNF-85487-GO-CP / Ad Component 1 - Protected Prácticas comer Single Stage - On 2018-11- 2018-11- 2018-11- 2018-12- 2018-11- 2018-12- 2019-01- 2019-01- 2019-03- 2019-02- 2019-04- quisición de 1 motocicletas TF / 18478 Areas Management and Fi Posterior Open - National 2,000.00 2,345.79 Finalizado ciales e Envelope 22 09 27 18 28 25 16 15 13 28 02 PNN Serranía de Churumbe nancial Sustainability los CO-PNF-89601-GO-DIR / A Component 2 - Forest Gov dquisición imágenes de Se Adquisición dire 2019-01- 2018-11- 2019-02- 2019-02- 2019-02- 2019-03- 2020-01- 2019-09- TF / A5789 ernance, Management and Posterior Direct 47,464.00 40,000.24 Finalizado nsores Remotos: Procalculo cta 28 19 02 07 15 18 15 15 Monitoring - Prosis. IDEAM - 2019 CO-PNF-99140-GO-CP / Ad Component 2 - Forest Gov Prácticas comer Single Stage - On 2019-03- 2019-02- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2019-05- 2019-05- quisición de un Motor 4 tie TF / 18478 ernance, Management and Posterior Open - National 4,516.00 4,090.64 Finalizado ciales e Envelope 01 05 06 22 06 29 18 01 30 15 04 mpos de 20 H.P. y 3 Hélice Monitoring s. CO-PNF-109167-GO-CP / A dquisición equipos implem entación estrategia de com Component 1 - Protected unicación y difusión (Cáma Prácticas comer Single Stage - On 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-07- 2019-07- TF / 18478 Areas Management and Fi Posterior Open - National 17,581.00 17,326.11 Finalizado ras fotográficas, grabadora ciales e Envelope 25 08 30 14 22 21 23 31 07 01 14 nancial Sustainability s de audio, micrófonos sem i profesionales y profesiona les, tripode profesional, tarj eta de memoria de 128 GB ) CO-PNF-109168-GO-RFQ / Adquisición de motocicleta Component 1 - Protected Solicitud de coti Single Stage - On 2019-04- 2019-06- 2019-06- 2019-07- 2019-07- s como apoyo a las activida TF / 18478 Areas Management and Fi Posterior Open - National 23,226.00 20,084.33 Finalizado zaciones e Envelope 30 17 19 17 03 des de PVC áreas protegida nancial Sustainability s nacionales, sedes locales y regionales CDA y CAZ CO-PNF-109172-GO-CP / A dquisición de Drones como Component 1 - Protected instrumentos de registro, c Prácticas comer Single Stage - On 2019-04- 2019-04- 2019-04- 2019-05- 2019-04- 2019-05- 2019-04- 2019-06- 2019-05- 2019-07- 2019-07- TF / 18478 Areas Management and Fi Posterior Open - National 4,516.00 2,293.05 Finalizado ontrol y seguimiento de los ciales e Envelope 25 11 30 14 22 21 12 04 25 04 05 nancial Sustainability recursos Naturales de la RF P y áreas protegidas region ales y nacionales del área del Proyecto. CO-PNF-109174-GO-CP / A Component 2 - Forest Gov Prácticas comer Single Stage - On 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-04- 2019-05- 2019-05- 2019-07- 2019-06- dquisición e instalación air TF / 18478 ernance, Management and Posterior Open - National 5,806.00 2,711.86 Finalizado ciales e Envelope 25 15 30 14 03 21 15 31 24 01 23 es acondicionados Monitoring CO-PNF-109327-GO-RFQ / Botes en Aluminio tipo Ara wana como apoyo a las act Component 1 - Protected Solicitud de coti Single Stage - On 2019-04- 2019-06- 2019-06- 2019-07- 2019-09- ividades de PVC áreas prot TF / 18478 Areas Management and Fi Posterior Open - National 74,839.00 69,488.64 Finalizado zaciones e Envelope 30 19 10 19 24 egidas nacionales, sedes lo nancial Sustainability cales y regionales CDA y C AZ y fortalecimiento resgu ardos del área del Proyecto CO-PNF-109328-GO-RFQ / Motores fuera de borda Mo tor Fuera de Borda Pata Co Component 1 - Protected Solicitud de coti Single Stage - On 2019-04- 2019-06- 2019-06- 2019-07- 2019-06- rta 40 HP, como apoyo a la TF / 18478 Areas Management and Fi Posterior Open - National 49,677.00 46,121.46 Finalizado zaciones e Envelope 30 17 12 17 26 s actividades de PVC áreas nancial Sustainability protegidas nacionales, sed es locales y regionales CDA y CAZ, y fortalecimiento re sguardos indígenas. CO-PNF-109336-GO-RFQ / Kit materiales y bienes de s eguridad alimentaria para f ortalecimiento de las famili Component 3 - Sectoral Pr Solicitud de coti Single Stage - On 2019-04- 2019-06- 2019-06- 2019-07- 2019-07- as que hacer parte de la As TF / 18478 ograms for Sustainable La Posterior Open - National 32,258.00 28,751.04 Finalizado zaciones e Envelope 30 18 25 18 06 ociación Campesina ACEFI ndscape Management N y conforman el Ramsar E FI, Jaula para aves, malla, p alas, machetes, grapas, lim as, semillas de pangoger (t omate, cilant CO-PNF-109338-GO-CP / A dquisición de herramientas diferenciales que permitan Component 3 - Sectoral Pr Prácticas comer Single Stage - On 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-07- 2019-07- el movimiento de grandes TF / 18478 ograms for Sustainable La Posterior Open - National 6,452.00 1,044.96 Finalizado ciales e Envelope 25 01 30 14 23 21 28 31 11 01 17 volúmenes y pesos, herram ndscape Management ientas de corte de madera de corte fino y combustible para el funcionamiento de l as herramientas. CO-PNF-103496-GO-CP / A Component 1 - Protected Solicitud de coti Single Stage - On 2019-04- 2019-06- 2019-05- 2019-08- 2019-06- dquisición equipos de cóm TF / 18478 Areas Management and Fi Posterior Open - National 48,397.00 28,304.88 Finalizado zaciones e Envelope 22 15 27 14 21 puto e impresoras y licenci nancial Sustainability as CO-PNF-109340-GO-CP / A dquisición equipos para el f ortalecimiento de la iniciati va de manejo sostenible y t Component 3 - Sectoral Pr Prácticas comer Single Stage - On 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-07- 2019-07- ransformación de la palma TF / 18478 ograms for Sustainable La Posterior Open - National 9,677.00 8,046.32 Finalizado ciales e Envelope 25 07 30 14 18 21 29 31 09 01 30 de Asai de la Comunidad In ndscape Management dígena Santa Lucia en Letic ia - Amazonas como despul padoras, licuadores , empa cadoras, y demas equipos que se requiere CO-PNF-85459-GO-RFQ / A dquisición e instalación de Component 2 - Forest Gov un sistema de video confer Solicitud de coti Single Stage - On 2019-05- 2019-07- 2019-06- 2019-09- 2019-07- TF / 18478 ernance, Management and Posterior Open - National 41,935.00 38,762.25 Finalizado encia video-wall, monitor in zaciones e Envelope 11 06 04 12 11 Monitoring dustrial, monitores led, co mpatible con sistema Lync de Microsoft en Corpoamaz onia CO-PNF-109165-GO-CP / A Component 1 - Protected Prácticas comer Single Stage - On 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-06- dquisición de GPS y cámar TF / 18478 Areas Management and Fi Posterior Open - National 15,484.00 11,136.25 Finalizado ciales e Envelope 25 25 30 14 08 28 14 07 30 08 28 as trampa nancial Sustainability CO-PNF-109163-GO-RFQ / Adquisición de equipos tec nológicos, licencias y estaci ones de trabajo para el fort Component 1 - Protected Solicitud de coti Single Stage - On 2019-04- 2019-06- 2019-06- 2019-07- 2019-08- alecimiento de las sedes ad TF / 18478 Areas Management and Fi Posterior Open - National 92,065.00 84,691.58 Finalizado zaciones e Envelope 30 14 19 31 23 ministrativas de PNN, Dto d nancial Sustainability e Putumayo Orito, Churum belos y La paya, Dto Caque tá ,Alto fragua y Serrania C hiribiquete. Adicionalmente regionales CO-PNF-123105-GO-CP / A dquisición e instalación de Component 1 - Protected repuestos para el manteni Prácticas comer Single Stage - On 2019-07- 2019-08- 2019-07- 2019-08- 2019-09- 2019-08- 2019-09- 2019-08- 2019-10- 2019-10- 2019-11- TF / A5789 Areas Management and Fi Posterior Open - National 4,839.00 3,287.66 Finalizado miento del bote del PNNSC ciales e Envelope 26 12 31 14 13 21 17 30 07 29 05 nancial Sustainability H, como apoyo a la activida des de PVC del Sector dfe Cartagena del Chairá, Caqu etá. CO-PNF-130048-GO-CP / A dquisición de Bote en fibra Component 1 - Protected Prácticas comer Single Stage - On 2019-09- 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-12- 2019-12- 2020-01- de vidrio para la Asociación TF / A5789 Areas Management and Fi Posterior Open - National 4,354.00 4,024.89 Finalizado ciales e Envelope 20 03 25 09 18 16 23 25 02 23 09 de Cabildos Indígenas del p nancial Sustainability ueblo Siona - ACIPS - APV P NN La paya CO-PNF-89870-GO-CP / Ad quisición de materiales par Component 3 - Sectoral Pr Prácticas comer Single Stage - On 2019-01- 2019-01- 2019-01- 2019-02- 2019-02- 2019-05- a la construcción de una ba TF / A5789 ograms for Sustainable La Posterior Open - National 8,929.00 0.00 Cancelado ciales e Envelope 10 15 29 05 15 16 lsa flotantes para labores ndscape Management de control y vigilancia en el área del Ramsar. CO-PNF-99144-GO-CP / Ad Component 1 - Protected Prácticas comer Single Stage - On 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-05- quisición de dos computad TF / 18478 Areas Management and Fi Posterior Open - National 4,516.00 0.00 Cancelado ciales e Envelope 01 06 21 28 05 31 ores portátiles y un comput nancial Sustainability ador de escritorio CO-PNF-109339-GO-CP / A dquisición de deshidratado r solar para fruta fresca co Component 3 - Sectoral Pr n capacidad de 50 kg, para Prácticas comer Single Stage - On 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- TF / 18478 ograms for Sustainable La Posterior Open - National 19,355.00 0.00 Cancelado el fortalecimiento de la inici ciales e Envelope 25 30 14 21 31 01 ndscape Management ativa de manejo sostenible y transformación de la pal ma de Asai de la Comunida d Indígena Santa Lucia en L eticia - Amazonas. CO-PNF-103501-GO-CP / C ompra de teléfonos fijos IP Component 1 - Protected Prácticas comer Single Stage - On 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- 2019-08- para ser instalados en cada TF / 18478 Areas Management and Fi Posterior Open - National 645.00 0.00 Cancelado ciales e Envelope 15 20 03 10 24 23 una de las oficina de coordi nancial Sustainability naciones de áreas y proyec tos CO-PNF-109332-GO-RFQ / Adquisición materiales par a fortalecimiendo chagras de los grupos de mujeres d Component 2 - Forest Gov Prácticas comer Single Stage - On 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- e los resguardo de Medio y TF / 18478 ernance, Management and Posterior Open - National 12,903.00 0.00 Cancelado ciales e Envelope 25 30 14 21 31 01 Bajo rio Caquetá. (Costales, Monitoring cuchillos cocina, metros de angeo, valdes aluminio, tim bos para almacenar alimen tos, guantes, tapabocas, m achetes mediano CO-PNF-109344-GO-CP / El ementos de ferreteria para Component 1 - Protected Prácticas comer Single Stage - On 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-09- mantenimiento correctivo TF / 18478 Areas Management and Fi Posterior Open - National 11,290.00 0.00 Cancelado ciales e Envelope 25 30 14 21 31 30 de la cubierta y cielo raso d nancial Sustainability e la sede operativa PNN La Paya CO-PNF-109170-GO-RFQ / Kit de campo y kit de herra Component 1 - Protected Solicitud de coti Single Stage - On 2019-04- 2019-06- 2019-07- mientas, áreas protegidas TF / 18478 Areas Management and Fi Posterior Open - National 24,194.00 0.00 Cancelado zaciones e Envelope 30 17 17 del SPNN, APR, Sitios Rams nancial Sustainability ar y zonas donde se desarr ollará inventario forestal. CO-PNF-109334-GO-CP / A dquisición de bienes para f ortalecimiendo chagras de Component 2 - Forest Gov los grupos de mujeres de lo Prácticas comer Single Stage - On 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- TF / 18478 ernance, Management and Posterior Open - National 12,903.00 0.00 Cancelado s resguardo de Medio y Baj ciales e Envelope 25 30 14 21 31 01 Monitoring o rio Caquetá (Tina Grande, Platones grandes de dos or ejas, Ollas No. 60 y 40, pail as grandes para fariña, mol inos) Page 1 CO-PNF-137074-GO-RFQ / Adquisición de Kits de agri cultura Orgánica para fortal ecer a las familias que susc Component 1 - Protected Solicitud de coti Single Stage - On 2019-11- 2019-12- 2020-02- 2020-01- 2020-03- ribirán los Acuerdos de Con TF / A5789 Areas Management and Fi Posterior Open - National 45,000.00 37,748.53 Finalizado zaciones e Envelope 04 23 03 22 02 servación con la CDA en el nancial Sustainability municipio de San José del Guaviare y Kit de campo y herramientas para los facili tadores locales del PNR Mir aflores CO-PNF-78419-GO-CP / Do tación Sede Mesa Ramsar. Component 3 - Sectoral Pr Prácticas comer Single Stage - On 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- (2 computadoras, 1 teléfon TF / A5789 ograms for Sustainable La Posterior Open - National 3,786.00 0.00 Cancelado ciales e Envelope 25 30 14 21 27 27 o, 2 escritorios, 2 estantes, ndscape Management 30 sillas, 1 tablero, 1 video beam y 1 impresora) CO-PNF-78385-GO-CP / AD Component 1 - Protected QUISICIÓN DE CAMARAS F Prácticas comer Single Stage - On 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- TF / 18478 Areas Management and Fi Posterior Open - National 3,679.00 0.00 Cancelado OTOGRAFICAS Y DOS GPS P ciales e Envelope 09 14 01 08 22 22 nancial Sustainability NN- LA PAYA Y ALTO FRAG UA CO-PNF-54229-GO-RFQ / U Component 2 - Forest Gov n agrabadora de voz, tipo p Solicitud de coti Single Stage - On 2018-05- 2018-06- 2018-06- 2018-10- TF / 18478 ernance, Management and Posterior Limited 1,700.00 0.00 Cancelado eriodista, digital, mp3 usb zaciones e Envelope 01 05 12 30 Monitoring px440 4GB Dos camaras D5500 kit 18 -55mm CO-PNF-54221-GO-RFQ / U Component 2 - Forest Gov n Motor Peque Peque 6,5H Solicitud de coti Single Stage - On 2018-04- 2018-06- 2018-05- 2018-10- TF / 18478 ernance, Management and Posterior Limited 900.00 0.00 Cancelado P cinco chalecos full thottle zaciones e Envelope 25 05 29 30 Monitoring , secado rapido 40 por cien to, para adulto. CO-PNF-78408-GO-RFQ / A dquisición de computadore s portátiles, computadores Component 3 - Sectoral Pr Solicitud de coti Single Stage - On 2018-11- 2019-01- 2019-03- de Escritorio + licencias Ofi TF / A5789 ograms for Sustainable La Posterior Open - National 28,214.00 0.00 Cancelado zaciones e Envelope 27 11 14 máticas y de Antivirus, Imp ndscape Management resora Multifuncional con t óner de repuestos, Videob eam, GPS y Table - CORPO AMAZONIA y CDA CO-PNF-78416-GO-CP / Ela boración y entrega de 100 kits (Bolsas ecologicas, cal Component 3 - Sectoral Pr Prácticas comer Single Stage - On 2019-10- 2019-10- 2019-11- 2019-11- 2019-12- 2020-02- endario ambiental, agenda TF / A5789 ograms for Sustainable La Posterior Open - National 7,742.00 0.00 Cancelado ciales e Envelope 21 26 16 23 06 04 informativa, esfero ecologi ndscape Management co, camibuso tipo polo, gor ra y capa) para el evento d e suscripción de acuerdos de conservación CO-PNF-123099-GO-CP / A dquisición materiales e ins Component 3 - Sectoral Pr Prácticas comer Single Stage - On 2019-07- 2019-07- 2019-08- 2019-08- 2019-08- 2019-10- umos para la construcción TF / A5789 ograms for Sustainable La Posterior Open - National 6,452.00 0.00 Cancelado ciales e Envelope 26 31 14 21 30 29 de las cabañas de control y ndscape Management vigilancia en el sitio Ramsa r Estrella Fluvial del Inírida - EFI CO-PNF-54227-GO-RFQ / El ementos de ferreteria: Ocho (8) timbos en plástico resistente con tapa, con ca Component 2 - Forest Gov Solicitud de coti Single Stage - On 2018-04- 2018-05- 2018-06- 2018-10- pacidad de 20 gls para el TF / 18478 ernance, Management and Posterior Limited 550.00 0.00 Cancelado zaciones e Envelope 29 28 05 30 manejo de gasolina Monitoring Cinco (5) carpas para lluvia Un kit de herramientas y u n kit de repuestos básicos para motor pq pq CO-PNF-65527-GO-RFQ / A Component 2 - Forest Gov Solicitud de coti Single Stage - On 2018-07- 2018-08- 2018-12- TF / 18478 Posterior Limited 1,100.00 0.00 Cancelado dquisición de canoa de ma ernance, Management and zaciones e Envelope 17 30 14 dera. Monitoring CO-PNF-144829-GO-RFQ / Adquisición de Canoas en A luminio y Motores FB 40 HP como apoyo a las actividad Component 1 - Protected Solicitud de coti Single Stage - On 2019-12- 2020-01- 2020-02- 2020-02- 2020-09- es de PVC en áreas protegi TF / A5789 Areas Management and Fi Posterior Open - National 64,516.00 63,447.84 Finalizado zaciones e Envelope 04 20 26 20 06 das, sedes locales, regional nancial Sustainability es, CDA, CAZ y RAMSAR y resguardo de Santa Sofía- L eticia para el fortalecimien to de estrategia de monitor eo de recursos CO-PNF-109313-GO-RFQ / Adquisición equipos fortale cimiento sistema de inform ación ambiental SISA - SIG Component 2 - Forest Gov Solicitud de coti Single Stage - On 2019-04- 2019-06- 2019-07- AE, en la CDA: SERVIDOR N TF / 18478 ernance, Management and Posterior Open - National 51,613.00 0.00 Cancelado zaciones e Envelope 30 27 31 AS HPE StoreEasy 1860, DI Monitoring SCOS DUROS HPE 2.4TB SA S, SWITCH ADMINISTRABLE , COMPUTADOR TIPO PC TO DO EN UNO, LICENCIAS, A CD-GOV 1-24 Device 3 YR I CO-PNF-137116-GO-RFQ nitial S / Dotación de equipos de có mputo, almacenamiento y Component 1 - Protected Solicitud de coti Single Stage - On 2019-12- 2020-01- 2020-01- 2020-02- 2020-04- comunicaciones, GPS, y eq TF / A5789 Areas Management and Fi Posterior Open - National 49,032.00 45,051.32 Finalizado zaciones e Envelope 04 19 27 18 14 uipos para difusión y comu nancial Sustainability nicación para el desarrollo de las actividades inmersas en los componentes 1, 3 y 4. CO-PNF-109169-GO-CP / D otación de muebles de ofici na y enseres de las sedes d Component 1 - Protected e los parques, sedes CDA y Solicitud de coti Single Stage - On 2019-05- 2019-07- 2020-02- 2019-08- 2020-07- TF / A5789 Areas Management and Fi Posterior Open - National 25,000.00 16,076.69 Finalizado CAZ para el fortalecimient zaciones e Envelope 07 02 16 31 12 nancial Sustainability o operativo a nivel local y r egional: Muebles, escritorio s, sillas ergonómicas y silla s auditorio, Mesas, Estante s, archivos, never CO-PNF-137112-GO-CP / C ompra generador eléctrico Component 3 - Sectoral Pr Prácticas comer Single Stage - On 2019-11- 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- 2020-02- para el fortalecimiento de l TF / A5789 ograms for Sustainable La Posterior Open - National 3,871.00 0.00 Cancelado ciales e Envelope 29 15 04 17 23 03 02 a iniciativa de manejo sost ndscape Management enible del bosque en la co munidad indígena en Letici a CO-PNF-137108-GO-CP / C ompra de bienes para el for Component 1 - Protected talecimiento de la capacida Prácticas comer Single Stage - On 2019-10- 2019-11- 2019-11- 2019-11- 2019-12- 2019-11- 2019-12- 2019-12- 2020-01- 2020-01- 2020-03- TF / A5789 Areas Management and Fi Posterior Open - National 2,065.00 1,886.90 Finalizado d operativa del PNN la pay ciales e Envelope 30 20 04 18 05 25 10 05 25 03 31 nancial Sustainability a: Nevera para refrigeració n de elementos perecedero s y aire acondicionado, eve ntos PVC. CO-PNF-123101-GO-CP / A dquisición de una balsa par a labores de control y vigila Component 3 - Sectoral Pr ncia, en el sector de Loret Prácticas comer Single Stage - On 2019-07- 2019-07- 2019-08- 2019-08- 2019-08- 2019-11- TF / A5789 ograms for Sustainable La Posterior Open - National 9,677.00 0.00 Cancelado oyacú que contribuya al fo ciales e Envelope 26 31 14 21 30 29 ndscape Management rtalecimiento de la autorida d ambiental en el área Ram sar Tarapoto, entre Corpoa mazonia y autoridades indí genas. CO-PNF-147769-GO-CP / A dquisición de Kit de campo, Component 3 - Sectoral Pr kit de pesca y kit de herra Prácticas comer Single Stage - On 2019-12- 2020-02- 2020-01- 2020-01- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-03- 2020-07- TF / A5789 ograms for Sustainable La Posterior Open - National 12,258.00 4,191.58 Finalizado mientas para el establecimi ciales e Envelope 27 10 01 15 26 22 04 31 23 02 13 ndscape Management ento de chagras y de una maloka pequeña en el terri otrio del resguardo indígen a de Mesay CO-PNF-137126-GO-RFQ / Adquisicion de elementos d e construccion y ferreteria Component 1 - Protected para mantenimiento correc Solicitud de coti Single Stage - On 2019-11- 2019-12- 2020-02- TF / A5789 Areas Management and Fi Posterior Open - National 32,258.00 0.00 Cancelado tivo y preventivo, adecuaci zaciones e Envelope 04 23 21 nancial Sustainability on y/o reparacion de la sed e del Parque la Paya y sus sedes operativas Laguna la paya y Naranjal en el muni cipio de leguizamon CO-PNF-144826-GO-CP / D otación de muebles y ense Component 3 - Sectoral Pr Prácticas comer Single Stage - On 2020-01- 2020-01- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-02- 2020-03- 2020-10- res para las cabañas de la TF / A5789 ograms for Sustainable La Posterior Open - National 3,000.00 2,766.63 Finalizado ciales e Envelope 13 08 18 01 22 08 31 17 26 19 06 Estrella Fluvial de Inírida pa ndscape Management ra el fortalecimiento de ca pacidad operativa sitio Ra msar CO-PNF-144828-GO-CP / Ki t de campo para la dotació Component 3 - Sectoral Pr Prácticas comer Single Stage - On 2020-01- 2020-01- 2020-01- 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2020-03- 2020-03- 2020-05- n de cabañas de la Estrella TF / A5789 ograms for Sustainable La Posterior Open - National 6,000.00 3,258.51 Finalizado ciales e Envelope 13 15 18 01 29 08 14 17 13 19 01 fluvial de Inírida para el fo ndscape Management rtalecimiento de capacidad operativa sitio Ramsar CO-PNF-130046-GO-RFQ / Adquisición de elementos d e construcción y ferretería, Component 1 - Protected Solicitud de coti Single Stage - On 2020-01- 2020-03- 2020-03- 2020-04- 2020-04- para el mantenimiento pre TF / A5789 Areas Management and Fi Posterior Open - National 19,355.00 17,571.67 Finalizado zaciones e Envelope 18 08 08 06 14 ventivo/correctivo y adecu nancial Sustainability ación del auditorio de la Se de Administrativa ubicada en el Municipio de Leguíza mo - la paya CO-PNF-150333-GO-CP / A Component 1 - Protected dquisición de cámaras de s Prácticas comer Single Stage - On 2019-12- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-02- 2020-02- 2020-03- 2020-03- TF / A5789 Areas Management and Fi Posterior Open - National 1,129.00 522.86 Finalizado eguridad para el PNN S Chi ciales e Envelope 30 10 04 18 23 25 28 01 17 02 13 nancial Sustainability ribiquete, sedes San José d el Guaviare y Calamar CO-PNF-156567-GO-CP / D otación de muebles de ofici Component 1 - Protected na y enseres para la sede d Prácticas comer Single Stage - On 2020-03- 2020-02- 2020-04- 2020-04- 2020-02- 2020-04- 2020-03- 2020-05- 2020-03- 2020-06- 2020-07- TF / A5789 Areas Management and Fi Posterior Open - National 4,194.00 3,083.66 Finalizado el Parque Nacional Natural ciales e Envelope 30 05 04 18 20 25 09 05 29 04 02 nancial Sustainability Serranía de Chiribiquete en Florencia, Caquetá, para su funcionamiento operativo. CO-PNF-130043-GO-CP / A dquisición de elementos de seguridad y operación para Component 2 - Forest Gov Botes ( Botiquín Básico par Prácticas comer Single Stage - On 2019-09- 2020-06- 2019-09- 2019-10- 2020-07- 2019-10- 2020-08- 2019-10- 2020-09- 2019-12- 2020-11- TF / A5789 ernance, Management and Posterior Open - National 9,677.00 3,972.44 Finalizado a embarcación, Remo adap ciales e Envelope 20 18 25 09 07 16 19 28 10 27 14 Monitoring table al tamaño del bote, C aja básica de herramientas (para motor fuera de borda ), Extintor para embarcacio nes. CO-PNF-150329-GO-RFQ / Adquisición de Kits de agric Component 3 - Sectoral Pr ultura orgánica para el fort Solicitud de coti Single Stage - On 2020-07- 2020-08- 2020-09- 2020-09- 2020-10- TF / A5789 ograms for Sustainable La Posterior Open - National 59,355.00 24,283.91 Finalizado alecimiento de las familias zaciones e Envelope 05 15 02 14 03 ndscape Management que hacer parte de la Asoci ación Campesina ACEFIN y viven en el Sitio Ramsar EF I CO-PNF-178649-GO-RFQ / Adquisición de material ve getal para establecimiento Component 3 - Sectoral Pr de arreglos agroforestales Solicitud de coti Single Stage - On 2020-09- 2020-10- 2020-08- 2021-05- 2020-10- TF / A5789 ograms for Sustainable La Posterior Open - National 25,065.00 14,148.47 Finalizado y protocolos de restauració zaciones e Envelope 05 23 20 21 29 ndscape Management n en el marco de acuerdos de conservación, restauraci ón y no deforestación, en e l departamento del Guaviar e- CDA CO-PNF-178654-GO-CP / A dquisición de Motocicleta, Kits equipos e implementos Component 3 - Sectoral Pr Prácticas comer Single Stage - On 2020-08- 2020-10- 2020-09- 2020-09- 2020-11- 2020-09- 2020-12- 2020-10- 2021-01- 2020-12- 2021-03- para desarrollar el trabajo TF / A5789 ograms for Sustainable La Posterior Open - National 16,129.00 18,263.97 Finalizado ciales e Envelope 31 26 05 19 23 26 15 06 09 05 19 de campo para la impleme ndscape Management ntación de los Acuerdos de Conservación, Restauració n y No Deforestación CO-PNF-178652-GO-RFB / Adquisición de elementos p ara alinderamiento y refuer zo perimetral requerido par Component 3 - Sectoral Pr Solicitud de ofer Single Stage - On 2020-08- 2020-11- 2020-09- 2020-10- 2020-12- 2020-10- 2020-12- 2020-11- 2021-06- 2021-02- 2021-08- a establecimiento de arregl TF / A5789 ograms for Sustainable La Posterior Open - National 261,065.00 241,233.31 Finalizado tas e Envelope 31 19 05 05 18 15 23 12 02 10 27 os agroforestales y protoco ndscape Management los de restauración en el m arco de acuerdos de conser vación, restauración y no d eforestación, en el departa mento del Guav CO-PNF-178648-GO-RFQ / Adquisición de materiales, herramientas e insumos pa ra la adecuación del vivero Component 3 - Sectoral Pr Solicitud de coti Single Stage - On 2020-09- 2020-10- 2020-10- 2020-12- 2021-01- forestal comunitario en la i TF / A5789 ograms for Sustainable La Posterior Open - National 28,358.00 21,390.20 Finalizado zaciones e Envelope 05 23 16 22 07 nspección de Remolinos de ndscape Management l Caguán para la producció n del material vegetal para el establecimiento de los si stemas productivos sosteni bles CO-PNF-194080-GO-CP / A dquirir material vegetal par a implementación de los ac Component 3 - Sectoral Pr uerdos de conservación, re Prácticas comer Single Stage - On 2020-12- 2020-10- 2021-01- 2021-01- 2020-10- 2021-02- 2020-11- 2021-02- 2020-12- 2021-03- 2021-03- TF / A5789 ograms for Sustainable La Posterior Open - National 5,821.00 5,818.35 Finalizado stauración y no deforestaci ciales e Envelope 30 05 04 25 20 01 13 22 11 24 12 ndscape Management ón, mediante sistemas pro ductivos orientados a resta uración en el núcleo 2 de C artagena del Chairá, depart amento del Caquetá CO-PNF-194053-GO-RFQ / Adquisición de elementos p ara salvaguardar el bienest Component 3 - Sectoral Pr Solicitud de coti Single Stage - On 2021-01- 2021-02- 2020-12- 2021-03- 2021-01- ar de las comunidades ben TF / A5789 ograms for Sustainable La Posterior Open - National 26,866.00 24,716.69 Finalizado zaciones e Envelope 04 18 08 20 03 eficiarias del Proyecto GEF ndscape Management CA, que a su vez aportan al fortalecimiento de la sober anía alimentaria indígena CO-PNF-178647-GO-RFB / Adquisición de Kits de cam po para el personal que ap oyará la implementación d Component 3 - Sectoral Pr Solicitud de ofer Single Stage - On 2020-12- 2020-12- 2021-01- 2021-02- 2021-01- 2021-02- 2021-03- 2021-05- e los Acuerdos de Conserva TF / A5789 ograms for Sustainable La Posterior Open - National 543,165.00 0.00 Cancelado tas e Envelope 30 21 04 03 25 13 13 12 ción, Restauración y No Def ndscape Management orestación, y Kits de agricul tura Orgánica, Kits de insu mos agrícolas para sistema s productivos sostenibles, y Kits de cerca CO-PNF-200271-GO-CP / A dquisición de bienes para e l fortalecimiento de la capa cidad operativa, la goberna Component 3 - Sectoral Pr Prácticas comer Single Stage - On 2020-12- 2020-10- 2021-01- 2021-01- 2021-01- 2021-01- 2021-01- 2021-02- 2021-02- 2021-03- 2021-04- bilidad, en el marco de estr TF / A5789 ograms for Sustainable La Posterior Open - National 7,284.00 4,813.71 Finalizado ciales e Envelope 30 29 04 18 29 25 15 01 28 03 03 ategias complementarias d ndscape Management e conservación, para el des arrollo propio de la comuni dad interétnica del resguar do indígena Llanos del Yarí – Yaguara CO-PNF-200251-GO-RFQ / Adquisición de insumos y materiales necesarios para Component 3 - Sectoral Pr la producción de material v Solicitud de coti Single Stage - On 2021-01- 2021-02- 2021-03- TF / A5789 ograms for Sustainable La Posterior Open - National 12,057.00 0.00 Cancelado egetal de especies forestal zaciones e Envelope 04 18 20 ndscape Management es protectoras, necesarias para el establecimiento e i mplementación de los Acue rdos de Conservación, Rest auración y No Deforestació nCO-PNF-200250-GO-CP / A dquisición equipos tecnoló gicos (Cámara, GPS, video Component 1 - Protected beam, computador, impres Prácticas comer Single Stage - On 2020-12- 2020-10- 2021-01- 2021-01- 2020-11- 2021-01- 2020-12- 2021-02- 2020-12- 2021-02- 2021-02- TF / A5789 Areas Management and Fi Posterior Open - National 8,133.00 6,304.28 Finalizado ora y disco duro) para el fo ciales e Envelope 30 30 04 18 18 25 07 04 22 05 02 nancial Sustainability rtalecimiento de la capacid ad operativa de la Asociaci ón APKAC, Resguardos Indí genas Cecilia Cocha, Perec era y Paya Indígena. CO-PNF-204769-GO-CP / A dquisición de insumos y ma teriales necesarios para la Component 3 - Sectoral Pr producción de material veg Prácticas comer Single Stage - On 2020-12- 2020-12- 2021-01- 2021-01- 2020-12- 2021-01- 2021-01- 2021-02- 2021-02- 2021-03- 2021-03- TF / A5789 ograms for Sustainable La Posterior Open - National 12,018.00 10,403.25 Finalizado etal de especies forestales ciales e Envelope 30 03 04 18 23 28 22 07 08 09 16 ndscape Management protectoras, necesarias par a el establecimiento e impl ementación de los Acuerdo s de Conservación, Restaur ación y No Deforestación CO-PNF-178645-GO-RFQ / Adquisición material veget al para el establecimiento Component 3 - Sectoral Pr de sistemas productivos so Solicitud de coti Single Stage - On 2021-01- 2021-02- 2021-04- TF / A5789 ograms for Sustainable La Posterior Open - National 22,277.00 0.00 Cancelado stenibles para la implemen zaciones e Envelope 04 21 22 ndscape Management tación de los acuerdos de c onservación, restauración y no deforestación, en el dep artamento de Caquetá - CO RPOAMAZONIA CO-PNF-223622-GO-CP / A dquirir papelería y útiles de oficina, para facilitar la lab Component 3 - Sectoral Pr or del equipo técnico en ca Prácticas comer Single Stage - On 2021-06- 2021-03- 2021-07- 2021-07- 2021-06- 2021-07- 2021-07- 2021-08- 2021-08- 2021-09- 2021-09- TF / A5789 ograms for Sustainable La Posterior Open - National 5,422.00 3,314.41 Finalizado mpo en función de las activ ciales e Envelope 30 26 05 19 03 26 15 05 13 04 29 ndscape Management idades programadas con lo s beneficiarios que suscribi eron acuerdos de conserva ción, restauración y no def orestación. CO-PNF-223143-GO-CP / A dquisición de equipos de e quipos computo, memorias Component 4 - Project Coo extraíbles, Discos duros sol rdination, Management, M Prácticas comer Single Stage - On 2021-06- 2021-03- 2021-07- 2021-07- 2021-04- 2021-07- 2021-05- 2021-08- 2021-06- 2021-09- 2021-07- TF / A5789 Posterior Open - National 4,593.00 4,153.10 Finalizado idos, eleva pantallas, desca onitoring and Evaluation ( ciales e Envelope 30 26 05 19 21 26 04 05 02 04 09 nsa pies y kits de mouse y M&E) teclado para el fortalecimie nto institucional y aumento en la capacidad operativa d el proyecto. CO-PNF-182725-GO-CP / A dquisición de insumos y he rramientas para la producci ón de material vegetal req Component 3 - Sectoral Pr Solicitud de coti Single Stage - On 2021-07- 2021-09- 2021-10- uerido en el establecimient TF / A5789 ograms for Sustainable La Posterior Open - National 14,925.00 0.00 Cancelado zaciones e Envelope 14 07 07 o de arreglos agroforestale ndscape Management s y protocolos de restauraci ón en el marco de acuerdo s de conservación, restaura ción y no deforestación, en el departamen CO-PNF-234244-GO-RFQ / Adquirir semillas sexuales pregerminadas de especies Component 3 - Sectoral Pr agroforestales maderables Solicitud de coti Single Stage - On 2021-07- 2021-09- 2021-07- 2021-10- 2021-10- TF / A5789 ograms for Sustainable La Posterior Open - National 6,031.00 5,200.97 Finalizado y frutales amazónicos para zaciones e Envelope 05 02 20 02 08 ndscape Management la implementación sistema s contemplados en las Herr amientas de Manejo del Pai saje HMP, orientados a la r estauración ecológica. CO-PNF-239248-GO-RFB / Adquirir materiales, insumo s y accesorios para el aisla Component 3 - Sectoral Pr miento eléctrico de áreas c Solicitud de ofer Single Stage - On 2021-09- 2021-07- 2021-10- 2021-11- 2021-09- 2021-11- 2021-10- 2021-12- 2021-11- 2022-02- 2022-07- TF / A5789 ograms for Sustainable La Posterior Open - National 293,411.00 261,381.03 Finalizado on paneles solares, estantil tas e Envelope 30 02 05 04 06 14 21 12 24 10 02 ndscape Management los de madera plástica e in sumos agrícolas, con el fin de apoyar la implementaci ón de conservación, restau ración y no deforestación. CO-PNF-247137-GO-RFQ / Adquisición de elementos d e bioseguridad para salvag Component 4 - Project Coo uardar el bienestar de los d rdination, Management, M Solicitud de coti Single Stage - On 2021-10- 2021-11- 2021-12- TF / B1287 Posterior Open - National 7,373.00 0.00 Cancelado elegados de las comunidad onitoring and Evaluation ( zaciones e Envelope 05 25 25 es beneficiarias y del equip M&E) o del Proyecto GEF CA en e l marco de los encuentros r ealizados fuera de los territ orios indígenas. Page 2 CO-PNF-255217-GO-RFQ / Adquirir de Kits de segurida d náutica para dotar las ca noas en Duraluminio adquir Component 1 - Protected Solicitud de coti Single Stage - On 2022-01- 2022-02- 2022-02- 2022-04- 2022-04- idas a través el proyecto G TF / A5789 Areas Management and Fi Posterior Open - National 11,826.00 8,316.63 Finalizado zaciones e Envelope 04 18 06 19 26 EF Corazón Amazonia, para nancial Sustainability las entidades socias CORP OAMAZONIA y la Corporaci ón para el Desarrollo Soste nible del Norte y el Oriente Amazónico-CDA. CO-PNF-253889-GO-DIR / S uministrar y entregar mate rial vegetal certificado de e species forestales maderab Component 3 - Sectoral Pr Adquisición dire 2021-12- 2021-11- 2022-01- 2021-12- 2022-01- 2021-12- 2022-08- 2022-09- les y especies frutales en lo TF / A5789 ograms for Sustainable La Posterior Direct 33,029.00 41,453.43 Finalizado cta 30 29 07 03 25 28 23 02 s predios de los usuarios d ndscape Management el proyecto, para el estable cimiento e implementación de los Acuerdos de Conserv ación, Restauración y No D eforestació CO-PNF-255219-GO-DIR / S uministrar y entregar equip os de aserrío y de transfor Component 3 - Sectoral Pr mación de madera y las he Adquisición dire 2021-12- 2021-11- 2022-01- 2022-02- 2022-01- 2022-03- 2022-05- 2022-05- TF / A5789 ograms for Sustainable La Posterior Direct 43,707.00 39,603.60 Finalizado rramientas y accesorios, in cta 30 29 07 21 26 18 26 30 ndscape Management cluido el servicio de instala ción, montaje y entrenamie nto para el manejo en el fu ncionamiento y medidas de seguridad. CO-PNF-268535-GO-RFQ / Adquisición de alambre de púas y grapas requeridos p Component 3 - Sectoral Pr ara alinderamiento y refuer Solicitud de coti Single Stage - On 2022-01- 2022-02- 2022-05- 2022-04- 2022-08- TF / A5789 ograms for Sustainable La Posterior Open - National 81,590.00 65,116.58 Finalizado zo perimetral, para el estab zaciones e Envelope 04 21 06 22 14 ndscape Management lecimiento e implementació n de los Acuerdos de Conse rvación, Restauración y No Deforestación en las áreas priorizadas por la CDA CO-PNF-297007-GO-RFQ / Adquirir elementos de ferre tería e insumos agrícolas n Component 3 - Sectoral Pr Solicitud de coti Single Stage - On 2022-10- 2022-11- 2022-08- 2022-12- 2022-09- ecesarios para el estableci TF / A5789 ograms for Sustainable La Posterior Open - National 2,322.00 0.00 Finalizado zaciones e Envelope 08 23 17 23 18 miento de viveros con espe ndscape Management cies de árboles nativos en z onas de alimentación de pe ces - pepiaderos dentro de la EFI sitio Ramsar. CO-PNF-307365-GO-RFQ / Suministro de equipos de o ficina, cómputo, tecnológic Component 1 - Protected os, muebles, elementos de Solicitud de coti Single Stage - On 2023-01- 2023-02- 2022-11- 2023-05- 2023-02- TF / A5789 Areas Management and Fi Posterior Open - National 55,927.00 0.00 Finalizado ferretería, kits de campo y zaciones e Envelope 04 14 08 15 10 nancial Sustainability ralladoras de yuca con el fi n de fortalecer operativa y administrativamente el pro yecto GEF Corazón de la A mazonía. CO-PNF-307362-GO-RFQ / Adquisición postes de mad era requeridos para el alind Component 3 - Sectoral Pr eramiento de las áreas prio Solicitud de coti Single Stage - On 2023-01- 2023-02- 2022-09- 2023-04- 2022-12- TF / A5789 ograms for Sustainable La Posterior Open - National 19,250.00 0.00 Finalizado rizadas para el establecimi zaciones e Envelope 04 19 30 20 04 ndscape Management ento e implementación de l os acuerdos de conservació n, restauración y no defore stación en las áreas prioriz adas por la CDA CO-PNF-316044-GO-RFQ / Adquisición de maquinaria e insumos para la transfor Component 3 - Sectoral Pr mación, empaque y conser Solicitud de coti Single Stage - On 2022-12- 2023-02- 2022-12- 2023-04- 2023-02- TF / A5789 ograms for Sustainable La Posterior Open - National 14,818.10 0.00 Finalizado vación, de los productos for zaciones e Envelope 24 07 19 08 20 ndscape Management estales no maderables del bosque (PFNM) del proyect o conservación de bosques y sostenibilidad en el coraz ón de la amazonia. CO-PNF-316387-GO-RFQ / ADQUISICIÓN DE SEMILLA SELECCIONADA, PARA LA I MPLEMENTACIÓN DE SISTE Component 3 - Sectoral Pr MAS PRODUCTIVOS SOSTE Solicitud de coti Single Stage - On 2022-12- 2023-02- 2022-11- 2023-06- 2023-05- TF / A5789 ograms for Sustainable La Posterior Open - National 51,101.12 0.00 Finalizado NIBLES CON LAS COMUNID zaciones e Envelope 24 10 18 10 21 ndscape Management ADES BENEFICIARIAS DEL P ROYECTO CONSERVACIÓN DE BOSQUES Y SOSTENIBIL IDAD EN EL CORAZÓN DE L A AMAZONÍA EN EL MUNICI PIO DE CARTAGENA DEL C CO-PNF-316426-GO-RFQ / HAIRA. Adquisición de materiales, i nsumos y accesorios para e Component 3 - Sectoral Pr Solicitud de coti Single Stage - On 2022-12- 2023-03- 2022-11- 2023-06- 2023-02- l aislamiento eléctrico de ár TF / A5789 ograms for Sustainable La Posterior Open - National 108,157.42 0.00 Finalizado zaciones e Envelope 24 09 21 07 22 eas, con paneles solares re ndscape Management queridos para el establecim iento de las herramientas d e manejo del paisaje (HMP) . CO-PNF-326187-GO-RFQ / Adquisición de elementos d e poda requeridos para el Component 3 - Sectoral Pr mantenimiento de los siste Solicitud de coti Single Stage - On 2022-12- 2023-02- 2023-01- 2023-04- 2023-04- TF / A5789 ograms for Sustainable La Posterior Open - National 52,937.76 0.00 Finalizado mas productivos implemen zaciones e Envelope 24 03 26 04 28 ndscape Management tados en el marco de los ac uerdos de conservación, re stauración y no deforestaci ón en las áreas priorizadas por la CDA. CO-PNF-339642-GO-RFQ / Suministrar los materiales, insumos, y herramientas re queridas para la implement Component 1 - Protected Solicitud de coti Single Stage - On 2023-04- 2023-05- 2023-03- 2023-07- 2023-06- ación de sistemas de resta TF / A5789 Areas Management and Fi Posterior Open - National 13,988.45 0.00 Finalizado zaciones e Envelope 05 23 30 22 02 uración en el resguardo El I nancial Sustainability tilla PNN Serranía de Chiribi quete cumpliendo las espe cificaciones técnicas defini das en el marco del proyec to. CO-PNF-340012-GO-RFQ / Component 4 - Project Coo Adquisición de Tablet para rdination, Management, M Solicitud de coti Single Stage - On 2023-04- 2023-05- 2023-03- 2023-05- 2023-03- TF / B5182 Posterior Open - National 184.42 0.00 Finalizado el área financiera del proye onitoring and Evaluation ( zaciones e Envelope 05 18 02 19 16 cto GEF Corazón del Amazo M&E) nia. CO-PNF-356571-GO-RFQ / Adquisición de computador Component 2 - Forest Gov Solicitud de coti Single Stage - On 2023-07- 2023-08- 2023-07- 2023-09- 2023-08- es portátiles para el fortale TF / A5789 ernance, Management and Posterior Open - National 14,640.13 0.00 Finalizado zaciones e Envelope 05 29 14 28 13 cimiento de las capacidade Monitoring s del proyecto GEF corazón del amazonia. CO-PNF-356627-GO-RFQ / Adquirir equipo motor fuer a de borda con su debida i Component 2 - Forest Gov nstalación y herramientas, Solicitud de coti Single Stage - On 2023-07- 2023-08- 2023-06- 2023-10- 2023-08- TF / B5182 ernance, Management and Posterior Open - National 13,628.98 0.00 Finalizado para el aumento de la efect zaciones e Envelope 05 19 22 18 26 Monitoring ividad en los tiempos de de splazamiento y el mejorami ento de la seguridad del tra nsporte fluvial para el equi po del proyecto. CO-PNF-361388-GO-RFQ / Suministro de equipos tecn Component 1 - Protected ológicos, con el fin de fortal Solicitud de coti Single Stage - On 2023-07- 2023-08- 2023-08- 2023-10- TF / B5182 Areas Management and Fi Posterior Open - National 41,115.82 0.00 Rescindido ecer operativa y administra zaciones e Envelope 05 15 09 14 nancial Sustainability tivamente a las entidades s ocias del proyecto GEF Cor azón de la Amazonía. CO-PNF-365670-GO-RFQ / Adquisición de materiales y Component 1 - Protected elementos de ferretería en Solicitud de coti Single Stage - On 2023-10- 2023-11- 2024-01- TF / A5789 Areas Management and Fi Posterior Open - National 3,237.25 0.00 Cancelado el marco del proyecto GEF zaciones e Envelope 04 21 20 nancial Sustainability Conservación de Bosques y Sostenibilidad en el Corazó n de la Amazonia. CO-PNF-375872-GO-DIR / Adquisición de equipos elec Component 4 - Project Coo trónicos para la medición d rdination, Management, M Adquisición dire 2023-10- 2023-08- 2023-11- 2023-08- 2023-12- 2023-09- 2024-09- e CO2, accesorios y elemen TF / B5182 Posterior Direct - National 65,241.44 0.00 Firmado onitoring and Evaluation ( cta 31 10 10 22 07 28 02 tos conexos, incluyendo ins M&E) talación y capacitación par a el uso adecuado en la Tor re Eddy Covariance. CO-PNF-391526-GO-RFQ / Suministro de insumos, her ramientas y materiales req Component 1 - Protected ueridos para la reforestació Solicitud de coti Single Stage - On 2024-01- 2024-02- 2024-04- TF / A5789 Areas Management and Fi Posterior Open - National 10,871.75 0.00 Cancelado n como aporte al mejorami zaciones e Envelope 03 20 20 nancial Sustainability ento de las condiciones am bientales del caserío el jag uar de la Vereda el Camuy a, municipio de San Vicent e del Caguán – Caquetá. CO-PNF-391528-GO-RFQ / Adquisición de elementos d Component 3 - Sectoral Pr Solicitud de coti Single Stage - On 2024-01- 2024-02- 2024-01- 2024-04- 2024-03- e oficina, cómputo y tecnol TF / A5789 ograms for Sustainable La Posterior Open - National 46,482.34 0.00 Finalizado zaciones e Envelope 08 18 12 18 15 ógicos para el fortalecimien ndscape Management to institucional de la Direcc ión Territorial Caquetá. CO-PNF-397076-GO-RFQ / Adquisición de equipos par a el fortalecimiento instituc Component 2 - Forest Gov Solicitud de coti Single Stage - On 2024-01- 2024-02- 2024-03- ional, con el fin de fortalec TF / B5182 ernance, Management and Posterior Open - National 9,069.03 0.00 Cancelado zaciones e Envelope 06 17 18 er operativa y administrati Monitoring vamente a las entidades so cias del proyecto gef coraz ón de la amazonía. CO-PNF-424087-GO-RFQ / Contratar la adquisición e i mplementación de equipos Component 1 - Protected Solicitud de coti Single Stage - On 2024-06- 2024-07- 2024-06- 2024-08- 2024-07- tecnológicos, licencias de s TF / A5789 Areas Management and Fi Posterior Open - National 69,224.84 0.00 Finalizado zaciones e Envelope 09 20 11 19 13 oftware y elementos de ofi nancial Sustainability cina, con el fin de fortalece r la infraestructura tecnoló gica de las oficinas de Patri monio Natural. CO-PNF-424103-GO-RFQ / Adquisición de equipos par a el fortalecimiento instituc Component 3 - Sectoral Pr Solicitud de coti Single Stage - On 2024-06- 2024-07- 2024-07- 2024-08- ional de CAZ en el marco d TF / A5789 ograms for Sustainable La Posterior Open - National 1,493.20 0.00 Rescindido zaciones e Envelope 04 04 08 03 el proyecto CONSERVACIÓ ndscape Management N DE BOSQUES Y SOSTENI BILIDAD EN EL CORAZÓN D E LA AMAZONIA. CO-PNF-424113-GO-RFQ / Adquisición de cámaras de foto trampeo para monitor Component 1 - Protected eo de fauna silvestre, en el Solicitud de coti Single Stage - On 2024-06- 2024-07- 2024-07- 2024-08- TF / B5182 Areas Management and Fi Posterior Open - National 5,466.50 0.00 Firmado marco del monitoreo ambie zaciones e Envelope 04 08 08 07 nancial Sustainability ntal en la Reserva Forestal Protectora Nacional Serraní a La Lindosa - Angosturas II , en el Departamento del G uaviare. CO-PNF-424114-GO-RFQ / Adquisición de equipos par a el fortalecimiento instituc Component 2 - Forest Gov ional, con el fin de fortalec Solicitud de coti Single Stage - On 2024-06- 2024-07- 2024-07- 2024-08- TF / B5182 ernance, Management and Posterior Open - National 8,379.19 0.00 Firmado er operativa y administrati zaciones e Envelope 04 08 08 07 Monitoring vamente a las entidades so cias del proyecto CONSERV ACIÓN DE BOSQUES Y SOS TENIBILIDAD EN EL CORAZ ÓN DE LA AMAZONIA. CO-PNF-440772-GO-RFQ / Adquisición de alambre de púa y grapas para realizar el alinderamiento y refuerz Component 2 - Forest Gov Solicitud de coti Single Stage - On 2024-10- 2024-11- 2025-01- 2025-05- o perimetral de las áreas p TF / B5182 ernance, Management and Posterior Open - National 69,543.24 0.00 Firmado zaciones e Envelope 05 26 07 25 ara el establecimiento e im Monitoring plementación de los Acuer dos de Conservación, Resta uración y No Deforestación en las áreas priorizadas por la Corporación CO-PNF-443287-GO-RFQ / Adquirir bienes necesarios para el fortalecimiento de l Component 1 - Protected Solicitud de coti Single Stage - On 2024-10- 2024-11- 2024-10- 2025-01- a capacidad operativa y ad TF / B5182 Areas Management and Fi Posterior Open - National 4,937.11 0.00 Firmado zaciones e Envelope 05 08 24 07 ministrativa en el Santuario nancial Sustainability de Flora Plantas Medicinale s Orito Ingi Ande, en el mu nicipio de Orito Putumayo. CO-PNF-445601-GO-RFQ / Adquirir equipos para fortal ecer técnica, operativa y a dministrativamente a CORP Component 2 - Forest Gov Solicitud de coti Single Stage - On 2024-10- 2024-11- 2025-01- OAMAZONÍA y a las organiz TF / B5182 ernance, Management and Posterior Open - National 96,531.68 0.00 Cancelado zaciones e Envelope 05 05 04 aciones comunitarias, en la Monitoring aplicación de modelos de f orestería comunitaria en la s áreas priorizadas para la i mplementación del proyect o Conservación CO-PNF-449625-GO-RFQ / Adquirir equipos de comuni caciones para eventos, con Component 1 - Protected el fin de generar el reconoc Solicitud de coti Single Stage - On 2024-10- 2024-10- 2024-10- 2024-11- 2024-11- TF / A5789 Areas Management and Fi Posterior Open - National 4,751.18 0.00 Finalizado imiento y posicionamiento zaciones e Envelope 01 31 16 30 15 nancial Sustainability del proyecto Corazón de la Amazonía, con los diferent es actores y en los diferent es espacios que se generen . CO-PNF-449628-GO-RFQ / Adquirir equipo de navegac ión (bote) para movilizar al Component 2 - Forest Gov Solicitud de coti Single Stage - On 2024-10- 2024-11- 2025-01- 2025-02- equipo técnico y administra TF / B5182 ernance, Management and Posterior Open - National 21,346.75 0.00 Firmado zaciones e Envelope 05 18 22 16 tivo del proyecto que desar Monitoring rolla la ruta de implementa ción de acuerdos de conser vación, restauración y no d eforestación. CO-PNF-463514-GO-RFQ / Adquirir equipos tecnológic os y de oficina para el forta lecimiento institucional orie Component 1 - Protected Solicitud de coti Single Stage - On 2025-01- 2025-02- 2025-01- 2025-04- ntado al mejoramiento de l TF / B5182 Areas Management and Fi Posterior Open - National 10,417.78 0.00 Firmado zaciones e Envelope 01 22 27 23 a capacidad operativa para nancial Sustainability el desarrollo de las estrate gias priorizadas en el Plan de Manejo del Parque Naci onal Natural Alto Fragua In di Wasi. CO-PNF-467794-GO-RFQ / Adquirir agroinsumos, herr amientas y materiales para Component 1 - Protected la implementación del mod Solicitud de coti Single Stage - On Ejecución 2025-02- 2025-03- 2025-06- TF / B5182 Areas Management and Fi Posterior Open - National 10,769.23 0.00 elo asociativo de seguridad zaciones e Envelope pendiente 05 16 14 nancial Sustainability alimentaria transitorio en e l sector de Bacatí, municipi o de Miraflores, departame nto de Guaviare, en la Rese rva Natural Nacional Nukak .CO-PNF-467815-GO-RFB / Adquirir equipos y element os para fortalecer técnica, operativa y administrativa Component 1 - Protected Solicitud de ofer Single Stage - On Ejecución 2025-01- 2025-02- 2025-03- 2025-04- 2025-05- 2025-07- mente a CORPOAMAZONÍA TF / B5182 Areas Management and Fi Posterior Open - National 135,262.17 0.00 tas e Envelope pendiente 31 05 19 18 17 16 y a las organizaciones com nancial Sustainability unitarias, en la aplicación d e modelos de forestería co munitaria y restauración en las áreas priorizadas para l a implementación NON CONSULTING SERVICES Activity Reference No Estimated A Draft Bidding Doc Specific Procureme Proposal Submissio Bid Evaluation Rep Loan / Credit Market Appro Procurement Prequalificati Actual Amou Process Draft Pre-qualificati Prequalification Ev Bidding Documents Contract Completio . / Description Component Review Type Method mount (US$ ument / Justificatio nt Notice / Invitatio n / Opening / Minut ort and Recommen Signed Contract No. ach Process on (Y/N) nt (US$) Status on Documents aluation Report as Issued n ) n n es dation for Award Planne Actual Planne Actual Planne Actual Planne Actual Planne Actual Planne Actual Planne Actual Planne Actual Planne Actual d d d d d d d d d CO-PNF-34495-NC-RFQ / A copio de material audiovisu al y reproducción de los ví deos generados como mat Component 3 - Sectoral Pr Solicitud de coti Single Stage - On 2017-11- 2017-11- 2018-03- 2017-12- 2018-03- erial de capacitación de los TF / 18478 ograms for Sustainable La Posterior Limited 3,703.00 3,486.90 Finalizado zaciones e Envelope 06 29 11 20 25 talleres de la propuesta de ndscape Management la Gobernación del Guaviar e - Frenar frontera agrícola (Unidades Ambientales par a la Paz y la Prestación de servicio) CO-PNF-41744-NC-RFQ / P erfilar, tallar y preparar las Component 2 - Forest Gov Solicitud de coti Single Stage - On 2018-01- 2018-02- 2018-08- muestras de madera prove TF / 18478 ernance, Management and Posterior Limited 8,571.00 0.00 Cancelado zaciones e Envelope 03 28 27 nientes del Amazonas para Monitoring el desarrollo de las coleccio nes de madera. CO-PNF-41765-NC-RFQ / Pr Component 3 - Sectoral Pr estación de servicios de m Solicitud de coti Single Stage - On 2018-01- 2018-02- 2018-08- TF / 18478 ograms for Sustainable La Posterior Limited 3,571.00 0.00 Cancelado edios audiovisuales para g zaciones e Envelope 03 28 27 ndscape Management eneración de mensajes a di stintos sectores CO-PNF-75477-NC-CP / Dia gramación e impresión de Component 2 - Forest Gov Prácticas comer Single Stage - On 2018-09- 2019-02- 2018-09- 2019-03- 2018-10- 2019-03- 2018-10- 2019-03- 2018-11- 2019-04- 2018-12- 2019-07- 500 cuadernillos explicativ TF / 18478 ernance, Management and Posterior Limited 3,570.00 1,959.26 Finalizado ciales e Envelope 20 15 25 12 10 12 17 22 01 14 31 18 os del conocimiento local d Monitoring e las maderas que acompa ña las diferentes coleccion es CO-PNF-103502-NC-RFQ / Adquisición de los servicios de digitalización de mas de Component 1 - Protected 2.400.000 folios almacenad Solicitud de coti Single Stage - On 2019-03- 2019-05- 2019-05- 2019-11- 2019-10- TF / 18478 Areas Management and Fi Posterior Open - National 41,935.00 32,014.28 Finalizado os en GRM y en el archivo f zaciones e Envelope 18 01 31 29 04 nancial Sustainability ísico de la entidad, y cargu e de la información a la nu be y/o lugar de repositorio que disponga la entidad. CO-PNF-109175-NC-CP / A DECUACIÓN CENTRO DE D ATOS EN LA SEDE CENTRAL DE LA CDA EN PUERTO INIR Component 2 - Forest Gov Prácticas comer Single Stage - On 2019-04- 2019-04- 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-05- 2019-05- 2019-07- 2019-06- IDA, 50 PUNTOS DE RED D TF / 18478 ernance, Management and Posterior Open - National 14,839.00 12,229.16 Finalizado ciales e Envelope 25 11 30 14 23 21 03 31 20 01 24 E DATOS CATEGORÍA 6 Y E Monitoring NERGÍA REGULADA (INSTAL ADOS EN LA SEDE CENTRA L DE LA CDA EN PUERTO IN IRIDA y SISTEMA DE AIRE A CONDICIONADO 24.000 BT UCO-PNF-109317-NC-RFQ / Análisis de maderas para d Component 3 - Sectoral Pr efinir la trazabilidad del pro Solicitud de coti Single Stage - On 2019-04- 2019-06- 2019-06- 2019-07- 2019-07- TF / 18478 ograms for Sustainable La Posterior Open - National 29,032.00 26,832.74 Finalizado ductos promisorios en el se zaciones e Envelope 30 28 22 31 20 ndscape Management ctor de Capricho, en el mar co del Programa de Foreste ria Comunitaria. CO-PNF-130044-NC-CP / Fo rtalecimiento institucional mantenimiento y adecuaci Component 2 - Forest Gov ón a todo costo de puntos Prácticas comer Single Stage - On 2019-09- 2019-10- 2019-09- 2019-10- 2019-11- 2019-10- 2019-11- 2019-10- 2019-12- 2020-01- 2020-06- TF / A5789 ernance, Management and Posterior Open - National 6,452.00 4,931.20 Finalizado de red de datos categoría 6 ciales e Envelope 20 21 25 09 12 16 18 25 15 24 01 Monitoring y energía regulada para las oficinas de la Subdirección de administración ambient al de CORPOAMAZONIA."- s ede Mocoa CO-PNF-89883-NC-CP / Co nstrucción de una balsa flot ante para labores de contr ol y vigilancia en la entrada Component 3 - Sectoral Pr Prácticas comer Single Stage - On 2019-01- 2019-01- 2019-02- 2019-02- 2019-03- 2019-06- a Caño Bocón, que permita TF / A5789 ograms for Sustainable La Posterior Open - National 8,929.00 0.00 Cancelado ciales e Envelope 10 24 07 19 01 03 el fortalecimiento de la aut ndscape Management oridad ambiental en el área del Ramsar, entre CDA y ac uerdo con las autoridades i ndígenas de ejercer este co ntrol. Page 3 CO-PNF-89855-NC-RFQ / C Component 3 - Sectoral Pr Solicitud de coti Single Stage - On 2019-01- 2019-02- 2020-02- ontratación Transporte Fluv TF / A5789 ograms for Sustainable La Posterior Limited 18,571.00 0.00 Cancelado zaciones e Envelope 15 20 19 ial desplazamiento comuni ndscape Management dad EFI. CO-PNF-137118-NC-CP / El Component 1 - Protected aboración de mojones par Prácticas comer Single Stage - On 2019-10- 2019-11- 2019-10- 2019-11- 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-12- 2020-03- TF / A5789 Areas Management and Fi Posterior Open - National 3,226.00 2,888.19 Finalizado a materializar el límite de l ciales e Envelope 21 15 26 08 28 15 29 25 28 25 12 nancial Sustainability a RFP Serranía La Lindosa CO-PNF-109346-NC-RFQ / Component 1 - Protected Elaboración e impresión de Solicitud de coti Single Stage - On 2019-11- 2019-12- 2020-08- 2020-04- 2021-03- TF / A5789 Areas Management and Fi Posterior Open - National 38,710.00 10,943.09 Finalizado piezas comunicativas, mat zaciones e Envelope 04 22 10 19 26 nancial Sustainability erial y actividades de divul gación CO-PNF-78417-NC-CP / Ela borar, suministrar, transpor tar e instalar vallas informa Component 1 - Protected Solicitud de coti Single Stage - On 2019-12- 2020-01- 2020-02- 2020-04- 2020-09- tivas y de divulgación en el TF / A5789 Areas Management and Fi Posterior Open - National 26,452.00 18,515.81 Finalizado zaciones e Envelope 04 22 01 21 07 marco de los componentes nancial Sustainability de gestión del Proyecto GE F CA, en el departamento d e Guaviare, a cargo de la C orporación CDA. CO-PNF-78410-NC-CP / Co ntratación de actividades d e divulgación y comunicaci Component 3 - Sectoral Pr ón de los avances y resulta Prácticas comer Single Stage - On 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2019-03- TF / A5789 ograms for Sustainable La Posterior Limited 7,143.00 0.00 Cancelado dos (Programas radiales x ciales e Envelope 18 23 08 15 27 29 ndscape Management 15 minutos semanales - 8 capsulas informáticas - ela boración y emisión de 8 cu ñas radiales - CORPOAMAZ ONIA CO-PNF-71703-NC-RFQ / A dquisición e instalación de l a Red Electrica para la Sed Component 1 - Protected Solicitud de coti Single Stage - On 2018-04- 2018-08- 2018-11- e San Jose del Guaviare (ce TF / 18478 Areas Management and Fi Posterior Limited 16,667.00 0.00 Cancelado zaciones e Envelope 29 21 22 ntros de transformación de nancial Sustainability energía eléctrica, tipo post e sobre un apoyo de hormi gón de 750 kgf de carga de rotura. CO-PNF-17815-NC-RFB / A dquisición e instalación de l a Red Electrica para la Sed e San Jose del Guaviare (ce Component 1 - Protected Solicitud de coti Single Stage - On 2017-08- 2017-09- 2017-11- ntros de transformación de TF / 18478 Areas Management and Fi Posterior Limited 16,667.00 0.00 Cancelado zaciones e Envelope 22 20 20 energía eléctrica, tipo post nancial Sustainability e sobre un apoyo de hormigón de 7 50 kgf de carga de rotura y transformador de potencia de 15 , de 13.2 k) / Dia CO-PNF-81067-NC-CP tensiones Component 2 - Forest Gov gramación e impresión de Prácticas comer Single Stage - On 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2019-01- TF / 18478 ernance, Management and Posterior Open - National 17,857.00 0.00 Cancelado cartillas sobre recuperación ciales e Envelope 26 31 15 22 06 08 Monitoring de semillas de las chagras en Mirití CO-PNF-78420-NC-CP / Dis Component 3 - Sectoral Pr eño, impresión de vallas, fo Prácticas comer Single Stage - On 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- TF / A5789 ograms for Sustainable La Posterior Open - National 7,286.00 0.00 Cancelado lletos en las 5 áreas prioriz ciales e Envelope 22 27 12 19 29 25 ndscape Management adas por CDA y Mesa Rams ar. CO-PNF-144843-NC-RFQ / Desarrollo de actividades d e divulgación y comunicaci Component 1 - Protected ón de los avances y resulta Solicitud de coti Single Stage - On 2019-12- 2020-01- 2020-10- 2020-07- 2021-06- TF / A5789 Areas Management and Fi Posterior Open - National 27,097.00 14,204.90 Finalizado dos en la suscripción e impl zaciones e Envelope 04 23 14 23 28 nancial Sustainability ementación de los acuerdo s de conservación, restaura ción y no deforestación CD A y CORPOAMAZONIA ( Pro gramas radiales) CO-PNF-137114-NC-CP / S obrevuelos en áreas proteg idas del piedemonte amazó Component 1 - Protected Prácticas comer Single Stage - On 2019-11- 2019-11- 2019-12- 2019-12- 2019-11- 2019-12- 2019-12- 2020-01- 2019-12- 2020-07- 2020-01- nico y Parque Chiribiquete TF / A5789 Areas Management and Fi Posterior Open - National 8,871.00 4,988.39 Finalizado ciales e Envelope 29 15 04 18 28 25 03 04 18 06 27 para apoyar ejercicios de p nancial Sustainability revención, vigilancia y cont rol y monitoreo de presione s asociadas con actividade s antrópicas CO-PNF-109349-NC-CP / Tr Component 3 - Sectoral Pr asmisión de cuñas en progr Prácticas comer Single Stage - On 2019-11- 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-04- 2020-06- TF / A5789 ograms for Sustainable La Posterior Open - National 3,226.00 3,030.10 Finalizado amas radiales en el marco ciales e Envelope 29 22 04 18 09 25 20 04 23 03 11 ndscape Management de las actividades del Proy ecto. CO-PNF-78415-NC-CP / De sarrollo de actividades de d ivulgación y comunicación Component 3 - Sectoral Pr de los avances y resultados Prácticas comer Single Stage - On 2019-10- 2019-10- 2019-11- 2019-11- 2019-11- 2020-03- TF / A5789 ograms for Sustainable La Posterior Limited 10,000.00 0.00 Cancelado en la suscripción e implem ciales e Envelope 21 26 10 17 28 29 ndscape Management entación de los acuerdos d e conservación, restauració n y no deforestación CDA y CORPOAMAZONIA ( Progra mas radiales) CO-PNF-99133-NC-CP / Im presión del Plan de manejo Component 3 - Sectoral Pr Prácticas comer Single Stage - On 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-07- del Ramsar EFI y divulgació TF / A5789 ograms for Sustainable La Posterior Open - National 13,226.00 0.00 Cancelado ciales e Envelope 01 06 22 29 05 04 n a las comunidades locale ndscape Management s de la EFI y entidades gub ernamentales y ONG vincul adas. CO-PNF-145680-NC-CP / A dquisición de un Kit de cam po, un kit de pesca y un kit Component 3 - Sectoral Pr Prácticas comer Single Stage - On 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- 2020-02- de herramientas para el est TF / A5789 ograms for Sustainable La Posterior Open - National 12,258.00 0.00 Cancelado ciales e Envelope 29 04 18 25 03 02 ablecimiento de chagras y ndscape Management de una maloka pequeña en el terriotrio del resguardo i ndígena de Mesay CO-PNF-159310-NC-RFQ / Component 4 - Project Coo Solicitud de coti Single Stage - On 2020-02- 2020-03- 2020-03- Evento misión de preparaci TF / B1287 rdination, Management, M Posterior Open - National 20,968.00 0.00 Cancelado zaciones e Envelope 19 16 17 ón y evaluación de medio t onitoring and Evaluation ( érmino GEF 7 M&E) CO-PNF-145248-NC-CP / A decuación balsa del Resgu ardo Ticoya con la que se a Component 3 - Sectoral Pr poyará las labores de moni Prácticas comer Single Stage - On 2020-03- 2020-08- 2020-04- 2020-04- 2020-09- 2020-04- 2020-09- 2020-05- 2020-10- 2020-07- 2020-12- TF / A5789 ograms for Sustainable La Posterior Open - National 4,194.00 2,861.43 Finalizado toreo, contro y vigilancia, q ciales e Envelope 30 20 04 18 02 25 10 07 05 06 05 ndscape Management ue  contribuya al fortalecim iento de la autoridad ambie ntal en el área Ramsar Tar apoto, entre Corpoamazoni a y autoridades indígenas. CO-PNF-144824-NC-RFQ / Análisis de laboratorio Fase Component 3 - Sectoral Pr 2 para definir la trabajabilid Solicitud de coti Single Stage - On 2020-04- 2020-05- 2020-07- TF / A5789 ograms for Sustainable La Posterior Open - National 58,065.00 0.00 Cancelado ad de otras especies mader zaciones e Envelope 04 25 24 ndscape Management ables en el sector de Capric ho, en el marco del Progra ma de Forestería Comunita ria ASOCAPRICHO CO-PNF-89853-NC-CDD / T alleres y reuniones planeac ión, seguimiento y desarro Component 3 - Sectoral Pr Solicitud de coti Single Stage - On 2019-02- 2019-04- 2019-12- llo del plan de trabajo y co TF / A5789 ograms for Sustainable La Posterior Limited 14,643.00 0.00 Cancelado zaciones e Envelope 20 17 31 nstrucción del REM, en el ndscape Management marco de los acuerdos de c onsulta con el Resguardo It illa, para la segunda amplia ción del PNN SCH. CO-PNF-89852-NC-CDD / T alleres institucionales y con ATICOYA, para socializació Component 3 - Sectoral Pr n PM y concertación accion Solicitud de coti Single Stage - On 2019-02- 2019-04- 2019-12- TF / A5789 ograms for Sustainable La Posterior Limited 19,996.00 0.00 Cancelado es plan de trabajo, gastos zaciones e Envelope 20 17 31 ndscape Management de viaje y desplazamiento Planeación y Seguimiento, proceso de socialización, aj uste e implementación del Plan de Manejo - Tarapoto. CO-PNF-89851-NC-CDD / T alleres, reuniones, asamble as de resguardos y recorrid Component 2 - Forest Gov os, desarrollo planes de tra Solicitud de coti Single Stage - On 2019-02- 2019-04- 2019-12- TF / 18478 ernance, Management and Posterior Limited 37,143.00 0.00 Cancelado bajo que se convinieron en zaciones e Envelope 20 17 31 Monitoring el marco de la consulta pre via de la primera ampliació n del PNN SCH con los resg uardos del medio río Caque tá. CO-PNF-89850-NC-CDD / T alleres y reuniones consult Component 1 - Protected Solicitud de coti Single Stage - On 2019-02- 2019-04- 2019-12- a previa comunidades indíg TF / A5789 Areas Management and Fi Posterior Limited 53,571.00 0.00 Cancelado zaciones e Envelope 20 17 31 enas vecinas del Area Prot nancial Sustainability egida Regional del bajo Ca guan -CORPOAMAZONIA. CO-PNF-89798-NC-CDD / T alleres, reuniones, comités Component 1 - Protected Solicitud de coti Single Stage - On 2019-02- 2019-04- 2019-12- técnicos, operativos y coor TF / A5789 Areas Management and Fi Posterior Limited 62,066.00 0.00 Cancelado zaciones e Envelope 20 17 31 dinación, recorridos cumpli nancial Sustainability miento acuerdos de uso y manejo con PNN Paya. CO-PNF-161561-NC-RFQ / Realización de estudios an atómicos, propiedades físic Component 3 - Sectoral Pr o mecánicas, trabajabilidad Solicitud de coti Single Stage - On 2020-09- 2020-10- 2020-12- 2021-06- 2021-08- TF / A5789 ograms for Sustainable La Posterior Open - National 53,731.00 52,592.57 Finalizado y potencialidad de uso, de l zaciones e Envelope 02 20 01 17 17 ndscape Management as maderas de seis especie s forestales establecidas o de vegetación natural del d epartamento del Guaviare CO-PNF-184051-NC-CP / A decuación y mantenimient o a la embarcación ubicada Component 2 - Forest Gov en el municipio de Cartage Prácticas comer Single Stage - On 2021-06- 2021-07- 2021-07- 2021-07- 2021-08- 2021-10- TF / A5789 ernance, Management and Posterior Open - National 2,985.00 0.00 Cancelado na del Chairá de propiedad ciales e Envelope 30 05 20 27 03 02 Monitoring de Corpoamazonia en el m arco del proyecto “Conserv ación de Bosques y Sosteni bilidad en el Corazón de la Amazonia” CO-PNF-144823-NC-CP / I mpresión de cartillas sobre el Programa intercambio d Component 3 - Sectoral Pr Prácticas comer Single Stage - On 2021-01- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- e conocimiento sobre Mane TF / A5789 ograms for Sustainable La Posterior Open - National 3,226.00 0.00 Cancelado ciales e Envelope 13 18 01 08 17 20 jo Forestal Sostenible - Pro ndscape Management piedades técnicas de algun as especies maderables y n o maderables de la Amazo nia colombiana. CO-PNF-167968-NC-CP / E ventos de socialización GEF Component 4 - Project Coo 7, misiones de negociación rdination, Management, M Solicitud de coti Single Stage - On 2021-07- 2021-09- 2021-10- y cierre de la etapa de for TF / B1287 Posterior Open - National 20,000.00 0.00 Cancelado onitoring and Evaluation ( zaciones e Envelope 05 09 09 mulación del GEF7. (Alquile M&E) r salón de reunión, alojami ento, gastos de desplazami ento y alimentación) CO-PNF-242156-NC-RFQ / Contratar el servicio de im presión del libro enmarcad Component 3 - Sectoral Pr Solicitud de coti Single Stage - On 2021-10- 2021-12- 2021-10- 2022-02- 2022-01- o en el plan de Manejo del TF / A5789 ograms for Sustainable La Posterior Open - National 12,822.00 11,238.23 Finalizado zaciones e Envelope 05 03 04 01 09 sitio Ramsar EFI con el fin d ndscape Management e realizar la socialización d e las diferentes líneas estra tégicas y avances en su im plementación. CO-PNF-247135-NC-RFQ / Contratar el servicio de sob revuelo en áreas protegida Component 1 - Protected s del piedemonte amazónic Solicitud de coti Single Stage - On 2021-10- 2021-11- 2021-10- 2021-12- 2022-01- TF / A5789 Areas Management and Fi Posterior Open - National 6,164.00 5,334.31 Finalizado o (Parques Nacionales Natu zaciones e Envelope 05 25 20 25 07 nancial Sustainability rales Alto Fragua Indi Wasi, Serranía de los Churumbel os, La Paya y Santuario de Flora Plantas Medicinales O rito Ingi Ande) CO-PNF-247136-NC-RFQ / Servicio de impresión de m Component 1 - Protected aterial divulgativo del Parq Solicitud de coti Single Stage - On 2021-10- 2021-11- 2021-11- 2022-05- 2022-05- TF / A5789 Areas Management and Fi Posterior Open - National 3,267.00 2,519.79 Finalizado ue Nacional Natural Alto Fr zaciones e Envelope 05 25 16 24 23 nancial Sustainability agua Indi Wasi, con forme a los diseños entregados y aprobados. CO-PNF-247138-NC-DIR / S uministro de combustible e Component 4 - Project Coo n Puerto Santander, para g rdination, Management, M Adquisición dire 2021-09- 2021-08- 2021-10- 2021-09- 2021-10- 2021-10- 2021-12- 2022-01- TF / B1287 Posterior Direct 3,700.00 3,224.81 Finalizado arantizar el transporte fluvi onitoring and Evaluation ( cta 30 25 05 03 30 19 10 13 al de los Resguardos Indíge M&E) nas en el sector del Medio Caquetá- Luis Hernando Pla zas CO-PNF-247139-NC-DIR / S uministro de combustible y lubricantes en el Corregimi Component 4 - Project Coo ento de La Pedrera, que ga rdination, Management, M Adquisición dire 2021-09- 2021-08- 2021-10- 2021-09- 2021-10- 2021-10- 2021-12- 2022-01- ranticen el transporte fluvi TF / B1287 Posterior Direct 5,970.00 5,242.40 Finalizado onitoring and Evaluation ( cta 30 25 05 02 30 17 10 12 al de las comunidades de M&E) Mirití y permitan la realizac ión de las actividades progr amadas, reuniones prepara torias y de socialización de Gef 7. CO-PNF-247140-NC-RFQ / Component 4 - Project Coo Contratar los servicios de A rdination, Management, M Solicitud de coti Single Stage - On 2021-10- 2021-11- 2021-11- 2021-12- 2022-01- lojamiento en San José del TF / B1287 Posterior Open - National 10,531.00 6,605.11 Finalizado onitoring and Evaluation ( zaciones e Envelope 05 25 02 25 28 Guaviare para los participa M&E) ntes a la reunión de sociali zación de GEF7 CO-PNF-276624-NC-DIR / C ontratar el suministro de co mbustible y lubricantes pa Component 3 - Sectoral Pr ra la movilización de los be Adquisición dire 2022-03- 2022-02- 2022-04- 2022-04- 2023-04- TF / A5789 ograms for Sustainable La Posterior Direct 8,333.00 0.00 Cancelado neficiarios, participantes y cta 30 11 04 17 12 ndscape Management equipo técnico que acompa ña los procesos para la imp lementación del plan de m anejo del sitio Ramsar Estr ella Fluvial Inírida. CO-PNF-285597-NC-RFQ / Contratar el suministro de combustible y lubricantes p Component 3 - Sectoral Pr ara la movilización de los b Solicitud de coti Single Stage - On 2022-07- 2022-08- 2022-05- 2023-08- TF / A5789 ograms for Sustainable La Posterior Open - National 8,333.00 7,958.70 Rescindido eneficiarios, participantes y zaciones e Envelope 08 25 20 20 ndscape Management equipo técnico que acompa ña los procesos para la imp lementación del plan de m anejo del sitio Ramsar Estr ella Fluvial Inírida. CO-PNF-286730-NC-DIR / S uministrar combustible, lub ricantes y/o aditivos para la movilización de la embarca Component 3 - Sectoral Pr Adquisición dire 2022-06- 2022-03- 2022-07- 2022-04- 2022-07- 2022-05- 2023-07- 2023-08- ción y transporte del equip TF / A5789 ograms for Sustainable La Posterior Direct 8,333.00 14,287.20 Finalizado cta 30 29 05 20 23 16 18 15 o técnico y administrativo, ndscape Management que acompaña los proceso s para la implementación d e acuerdos de conservació n, restauración y no defore stación. CO-PNF-286731-NC-DIR / S uministro de combustible y lubricantes en Puerto Santa Component 3 - Sectoral Pr Adquisición dire 2022-06- 2022-03- 2022-07- 2022-03- 2022-07- 2022-05- 2022-10- 2022-10- nder, para garantizar el tra TF / A5789 ograms for Sustainable La Posterior Direct 4,167.00 4,009.65 Finalizado cta 30 29 05 31 29 08 27 20 nsporte fluvial de las comu ndscape Management nidades localizadas en los Resguardos Indígenas en el sector del Medio Caquetá. CO-PNF-298287-NC-RFQ / Realizar el proceso editoria Component 2 - Forest Gov l de diagramación e impres Solicitud de coti Single Stage - On 2022-10- 2022-11- 2023-05- TF / A5789 ernance, Management and Posterior Open - National 46,519.00 0.00 Cancelado ión de guías y cartillas para zaciones e Envelope 05 22 21 Monitoring la divulgación y comunicaci ón a nivel local e institucio nal relacionada con la siste matización CO-PNF-307347-NC-RFQ / Contratar el servicio de señ alización y amojonamiento Component 1 - Protected Solicitud de coti Single Stage - On 2022-10- 2022-11- 2022-10- 2022-12- 2022-12- de los puntos priorizados y TF / A5789 Areas Management and Fi Posterior Open - National 2,717.00 0.00 Finalizado zaciones e Envelope 08 22 20 22 19 precisados, correspondient nancial Sustainability es a los límites en el sector oriental del Parque Naciona l Natural Alto Fragua Indi W asi. CO-PNF-298287N-NC-RFQ / Realizar el proceso editoria Component 2 - Forest Gov l de diagramación e impres Solicitud de coti Single Stage - On 2022-08- 2022-10- 2022-09- 2023-03- 2023-03- TF / A5789 ernance, Management and Posterior Open - National 46,519.00 24,173.96 Finalizado ión de guías y cartillas para zaciones e Envelope 06 01 29 30 30 Monitoring la divulgación y comunicaci ón a nivel local e institucio nal relacionado con la siste matización. CO-PNF-321158-NC-RFQ / Contratar el suministro de combustible y lubricantes p Component 3 - Sectoral Pr ara la movilización de los b Solicitud de coti Single Stage - On 2022-12- 2023-02- 2023-09- TF / A5789 ograms for Sustainable La Posterior Open - National 3,985.06 0.00 Cancelado eneficiarios, participantes y zaciones e Envelope 24 03 01 ndscape Management equipo técnico que acompa ña los procesos para la imp lementación del plan de m anejo del sitio Ramsar Estr ella Fluvial Inírida. CO-PNF-340017-NC-RFQ / Contratar el servicio de aud Component 4 - Project Coo itorio y alimentación para e rdination, Management, M Solicitud de coti Single Stage - On 2023-04- 2023-05- 2023-02- 2023-07- l desarrollo del evento que TF / B5182 Posterior Open - National 5,532.50 0.00 Firmado onitoring and Evaluation ( zaciones e Envelope 05 23 24 22 permite adelantar la sociali M&E) zación resultados proyecto GEF corazón de la Amazoni a en la ciudad de Bogotá. CO-PNF-349266-NC-RFQ / Elaborar, suministrar e inst alar valla informativa en el Component 1 - Protected Solicitud de coti Single Stage - On 2023-07- 2023-08- 2023-05- 2024-02- 2023-07- límite del parque nacional TF / B5182 Areas Management and Fi Posterior Open - National 2,465.56 0.00 Finalizado zaciones e Envelope 05 22 19 18 18 natural serranía de los Chu nancial Sustainability rumbelos Auka Wasi ruta v ereda zarzal municipio de Mocoa, Putumayo. CO-PNF-302414-NC-RFQ / PRESTACIÓN DE SERVICIOS LOGÍSTICOS PARA LA ORGA Component 4 - Project Coo NIZACIÓN, ADMINISTRACIÓ rdination, Management, M Solicitud de coti Single Stage - On 2023-01- 2023-02- 2023-03- N Y EJECUCIÓN DE DOS EV TF / A5789 Posterior Open - National 4,108.00 0.00 Cancelado onitoring and Evaluation ( zaciones e Envelope 04 18 20 ENTOS DEL MINISTERIO DE M&E) AMBIENTE Y DESARROLLO SOSTENIBLE (MADS), CON EL APOYO DEL PROYECTO GEF – CORAZÓN DE LA AM AZONÍA CO-PNF-356610-NC-RFQ / Diagramación e impresión de guías y cartillas que con forman la “caja de herrami Component 1 - Protected Solicitud de coti Single Stage - On 2023-07- 2023-08- 2023-07- 2023-10- 2023-09- entas estrategia de preven TF / A5789 Areas Management and Fi Posterior Open - National 5,608.77 0.00 Finalizado zaciones e Envelope 05 22 13 21 12 ción y gestión de riesgo de nancial Sustainability violaciones a los derechos humanos e infracciones al derecho internacional hum anitario en el marco del pro yecto CO-PNF-360914-NC-RFQ / Contratar los servicios para el desarrollo de eventos pr Component 1 - Protected ogramados por la corporaci Solicitud de coti Single Stage - On 2023-07- 2023-08- 2023-06- 2023-09- 2024-10- TF / A5789 Areas Management and Fi Posterior Open - National 4,610.42 0.00 Finalizado ón para el desarrollo soste zaciones e Envelope 05 13 28 18 27 nancial Sustainability nible del norte y el oriente amazónico - CDA en el mar co de los componentes del proyecto corazón de la Am azonía en el área urbana Page 4 CO-PNF-361389-NC-RFQ / I mprimir y suministrar valla s informativas, en el marco Component 3 - Sectoral Pr del fortalecimiento de la pl Solicitud de coti Single Stage - On 2023-07- 2023-08- 2023-11- TF / B5182 ograms for Sustainable La Posterior Open - National 31,839.11 0.00 Cancelado anificación y el ordenamien zaciones e Envelope 05 15 13 ndscape Management to del turismo de naturalez a para la reserva forestal p rotectora nacional serranía la lindosa angosturas ii en el departamento del guavia CO-PNF-368092-NC-RFQ / I re. mprimir y suministrar valla s, en el marco del refuerzo Component 3 - Sectoral Pr informativo de la planificaci Solicitud de coti Single Stage - On 2023-10- 2023-11- 2024-01- 2024-02- TF / A5789 ograms for Sustainable La Posterior Open - National 31,839.11 0.00 Rescindido ón y el ordenamiento del tu zaciones e Envelope 10 25 02 23 ndscape Management rismo de naturaleza para la Reserva forestal Protectora Nacional Serranía la Lindos a Angosturas II, en el depar tamento del Guaviare. CO-PNF-369695-NC-RFQ / Contratar los servicios para Component 2 - Forest Gov el desarrollo de eventos pr Solicitud de coti Single Stage - On 2023-10- 2023-11- 2023-11- 2024-11- TF / A5789 ernance, Management and Posterior Open - National 12,678.65 0.00 Rescindido ogramados por el proyecto zaciones e Envelope 08 10 03 04 Monitoring GEF Corazón de la Amazoni a en cumplimiento a la soci alización resultados. CO-PNF-375871-NC-RFQ / Suministrar combustible y aceites para la movilización Component 2 - Forest Gov Solicitud de coti Single Stage - On 2023-11- 2023-12- 2023-10- 2024-10- de la embarcación y transp TF / B5182 ernance, Management and Posterior Open - National 13,831.26 0.00 Firmado zaciones e Envelope 10 25 02 20 orte del equipo técnico y a Monitoring dministrativo, para acompa ñar los procesos de restaur ación ecológica y el manejo forestal sostenible. CO-PNF-391532-NC-RFQ / Adecuación del auditorio g Component 3 - Sectoral Pr Solicitud de coti Single Stage - On 2024-01- 2024-02- 2023-12- 2024-03- 2024-01- eneral de la Dirección Terri TF / A5789 ograms for Sustainable La Posterior Open - National 4,572.00 0.00 Finalizado zaciones e Envelope 08 22 21 23 20 torial Caquetá de Corpoam ndscape Management azonia, para el fortalecimie nto institucional de la entid ad. CO-PNF-395466-NC-RFQ / Diagramación e impresión de un documento, para la d Component 1 - Protected ivulgación, socialización y Solicitud de coti Single Stage - On 2024-01- 2024-02- 2024-01- 2024-04- 2024-03- TF / A5789 Areas Management and Fi Posterior Open - National 11,538.46 0.00 Finalizado posicionamiento del Plan d zaciones e Envelope 06 17 11 17 10 nancial Sustainability e Manejo del Parque Natur al Regional Miraflores – Pic achos, y contribuir a la sos tenibilidad y conservación de esta área protegida. CO-PNF-405715-NC-RFQ / PRESTAR LOS SERVICIOS D Component 1 - Protected E OPERACIÓN LOGÍSTICA D Solicitud de coti Single Stage - On 2024-02- 2024-04- 2024-11- TF / A5789 Areas Management and Fi Posterior Open - National 25,641.00 0.00 Cancelado E EVENTOS NACIONALES Y/ zaciones e Envelope 28 04 30 nancial Sustainability O INTERNACIONALES PARA PARA EL PROYECTO GEF C ORAZÓN DE LA AMAZONIA. - GEF 6. CO-PNF-405727-NC-RFQ / CONTRATAR LOS SERVICIO Component 1 - Protected S DE REALIZACION DE EVE Solicitud de coti Single Stage - On 2024-02- 2024-04- 2024-11- TF / B5182 Areas Management and Fi Posterior Open - National 25,641.03 0.00 Cancelado NTOS NACIONALES Y/O INT zaciones e Envelope 28 04 30 nancial Sustainability ERNACIONALES PARA PARA EL PROYECTO GEF CORAZÓ N DE LA AMAZONIA. GEF 7 CO-PNF-424116-NC-RFQ / Suministro e instalación del servicio de amojonamiento para la delimitación física d Component 1 - Protected Solicitud de coti Single Stage - On 2024-06- 2024-07- 2024-10- el PNR Miraflores y Picacho TF / B5182 Areas Management and Fi Posterior Open - National 7,655.11 0.00 Cancelado zaciones e Envelope 04 08 06 s en la zona del Valle de Ba nancial Sustainability lsillas, Inspección de Guaya bal ZRC del Pato, corregimi ento del Danubio Florencia Caquetá y vereda Plumeros . CO-PNF-425123-NC-RFQ / PRESTAR LOS SERVICIOS D Component 1 - Protected Solicitud de coti Single Stage - On 2024-07- 2024-08- 2024-11- E OPERACIÓN LOGÍSTICA D TF / A5789 Areas Management and Fi Posterior Open - National 25,641.03 0.00 Cancelado zaciones e Envelope 01 02 30 E EVENTOS PARA EL PROYE nancial Sustainability CTO GEF CORAZÓN DE LA AMAZONIA. CO-PNF-440758-NC-RFQ / Realizar el mantenimiento l Component 3 - Sectoral Pr Solicitud de coti Single Stage - On 2024-08- 2024-10- 2024-09- 2024-11- 2024-11- ocativo del auditorio gener TF / A5789 ograms for Sustainable La Posterior Open - National 10,452.03 0.00 Finalizado zaciones e Envelope 27 01 25 30 24 al y las oficinas de la Direc ndscape Management ción Territorial Caquetá de CORPOAMAZONIA. CO-PNF-443215-NC-RFQ / Elaborar, suministrar e inst alar vallas informativas que respondan a los requerimie Component 3 - Sectoral Pr Solicitud de coti Single Stage - On 2024-09- 2024-10- 2024-10- 2024-11- 2024-11- ntos del Proyecto, orientad TF / A5789 ograms for Sustainable La Posterior Open - National 32,051.28 0.00 Finalizado zaciones e Envelope 03 01 16 30 30 as al proceso de planificaci ndscape Management ón, ordenamiento y gestión del turismo de naturaleza p ara la Reserva Forestal Prot ectora Nacional Serranía la Lindosa CO-PNF-449621-NC-RFQ / Prestar servicio de suminist ro de material informativo / Component 1 - Protected divulgativo, elementos de i Solicitud de coti Single Stage - On 2024-10- 2024-10- 2024-10- 2024-11- 2024-11- TF / A5789 Areas Management and Fi Posterior Open - National 43,806.42 0.00 Finalizado dentificación y protección p zaciones e Envelope 01 31 16 30 28 nancial Sustainability ara el personal y elemento s de señalización locativa, para el reconocimiento y p osicionamiento del proyect o corazón de la Amazonía. CO-PNF-455948-NC-RFQ / Prestar servicio de suminist ro de elementos necesarios para la realización de activi Component 1 - Protected Solicitud de coti Single Stage - On 2025-01- 2025-02- 2025-01- 2025-05- dades de campo en las áre TF / B5182 Areas Management and Fi Posterior Open - National 25,267.96 0.00 Firmado zaciones e Envelope 01 21 16 22 as de forestería, manejo for nancial Sustainability estal sostenible, restauraci ón, monitoreo de fauna y p esca, en las actividades de seguimiento al turismo de naturaleza CO-PNF-472535-NC-DIR / C ontratar los servicios para el desarrollo de la misión d Component 4 - Project Coo e supervisión programado rdination, Management, M Adquisición dire 2025-02- 2025-02- 2025-03- 2025-02- 2025-03- 2025-02- 2025-05- por el proyecto CONSERVA TF / B5182 Posterior Direct - National 11,538.46 0.00 Firmado onitoring and Evaluation ( cta 28 19 05 10 29 28 28 CIÓN DE BOSQUES Y SOST M&E) ENIBILIDAD EN EL CORAZÓ N DE LA AMAZONIA en cum plimiento a la socialización de resultados con el Banco Mundial. CO-PNF-481234-NC-RFQ / Suministro e instalación del Component 1 - Protected servicio de amojonamiento Solicitud de coti Single Stage - On Ejecución 2025-04- 2025-05- 2025-08- TF / B5182 Areas Management and Fi Posterior Open - National 10,320.51 0.00 para la delimitación física d zaciones e Envelope pendiente 10 22 20 nancial Sustainability el Parque Natural Regional Miraflores y Picachos, en el departamento del Caquetá. CONSULTING FIRMS Activity Reference No Short List and Draft Opening of Technic Combined Evaluati Loan / Credit Market Appro Contract Type Estimated A Actual Amo Process Stat Expression of Inter Request for Propos Evaluation of Tech Contract Completio . / Description Component Review Type Method Terms of Reference Request for Propos al Proposals / Minut on Report and Draf Signed Contract No. ach mount (US$) unt (US$) us est Notice als as Issued nical Proposal n als es t Negotiated Contr Planned Actual Planne Actual Planne Actual Planne Actual Planne Actual Planne Actual Planne act Actual Planne Actual Planne Actual d d d d d d d d CO-PNF-17962-CS-LCS / Co Component 4 - Project Coo Selección basad nsultoria que adelante la A rdination, Management, M 2017-08-0 2017-05- 2017-08- 2017-08- 2017-09- 2017-09- 2017-09- 2017-09- 2017-09- 2017-09- 2017-09- 2017-09- 2017-10- 2017-11- 2017-12- TF / 18478 Posterior a en el menor c Open - National 16,667.00 8,938.80 Finalizado uditoría Externa al Proyect onitoring and Evaluation ( 1 31 01 15 25 14 18 15 27 20 27 30 02 29 02 osto o Corazón de la Amazonia - M&E) 2017 CO-PNF-17980-CS-QCBS / Component 1 - Protected Selección basad 2017-02-1 2017-03- 2017-03- 2017-04- 2017-05- 2017-05- 2017-06- 2018-02- Consultoría para analisis ec TF / 18478 Areas Management and Fi Posterior a en calidad y c Open - National 111,111.00 0.00 Cancelado 5 01 31 30 07 19 10 05 onómico financiero del PNN nancial Sustainability osto Chiribiquete FPN C1 CO-PNF-20949-CS-QCBS / Consultoría para la Identific Component 3 - Sectoral Pr Selección basad ación de áreas susceptibles 2017-08-3 2017-09- 2017-09- 2017-10- 2017-10- 2017-11- 2017-11- 2018-03- TF / 18478 ograms for Sustainable La Posterior a en calidad y c Open - National 111,111.00 0.00 Cancelado para la implementación de 0 13 23 23 30 10 21 21 ndscape Management osto compensaciones por pérdid a de la biodiversidad en la j urisdicción de CDA. CO-PNF-41773-CS-LCS / Au Component 4 - Project Coo Selección basad 2018-02-2 2018-03- 2018-04- 2018-05- 2018-06- 2018-07- 2018-09- 2018-11- ditoría externa al proyecto TF / 18478 rdination, Management, M Posterior a en el menor c Open - National 15,714.00 0.00 Cancelado 0 13 26 24 23 28 01 30 año 2018 onitoring and Evaluation ( osto M&E) CO-PNF-17957-CS-LCS / Co nsultoría para la elaboració Component 3 - Sectoral Pr Selección basad n de una Guía para el man 2017-09-0 2017-09- 2017-09- 2017-10- 2017-11- 2017-11- 2017-12- 2018-05- TF / 18478 ograms for Sustainable La Posterior a en el menor c Open - National 92,593.00 0.00 Cancelado ejo ambiental para la const 1 15 29 30 07 17 01 30 ndscape Management osto rucción, mantenimiento, re habilitación y mejoramient o de vías de tercer orden. CO-PNF-17956-CS-QCBS / Evaluación ambiental estra Component 3 - Sectoral Pr Selección basad 2017-08-1 2017-09- 2017-09- 2017-11- 2017-11- 2017-11- 2017-12- 2018-08- tégica de iniciativas sectori TF / 18478 ograms for Sustainable La Posterior a en calidad y c Open - National 103,704.00 0.00 Cancelado 5 14 25 09 14 20 04 01 ales (nacional y territorial) ndscape Management osto en municipios arco de defo restación. CO-PNF-54338-CS-CQS / C ONSULTORÍA PARA LLEVAR Selección basad Component 3 - Sectoral Pr A CABO LA ELABORACIÓN a en calificacion 2018-04-2 2018-04- 2018-05- 2018-06- 2018-05- 2018-07- 2018-10- 2018-09- 2018-10- 2019-06- 2019-02- TF / 18478 ograms for Sustainable La Posterior Open - National 250,000.00 241,752.68 Finalizado DE LA EVALUACIÓN AMBIE es de consultor 5 18 16 29 15 29 12 02 24 30 16 ndscape Management NTAL ESTRATÉGICA REGIO es NAL DEL ARCO NOROCCIDE NTAL AMAZÓNICO" CO-PNF-54334-CS-QCBS / ELABORACIÓN DE LA GUÍA Component 3 - Sectoral Pr Selección basad AMBIENTAL PARA LA IMPLE 2018-05-1 2017-11- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2018-08- 2018-09- 2018-08- 2018-10- 2019-04- 2019-06- TF / 18478 ograms for Sustainable La Posterior a en calidad y c Open - National 92,595.00 90,019.00 Finalizado MENTACIÓN DEL CONPES 3 5 09 05 21 03 21 03 01 06 20 18 30 12 30 11 ndscape Management osto 857 DE 2016 LINEAMIENTO S DE POLÍTICA PARA LA GE STIÓN DE LA RED TERCIARI A CO-PNF-21283-CS-QCBS / Component 2 - Forest Gov Selección basad 2017-09-0 2017-09- 2017-11- 2017-11- 2017-12- 2018-02- 2018-03- 2018-09- Consultoría para fortalecim TF / 18478 ernance, Management and Posterior a en calidad y c Open - National 111,111.00 0.00 Cancelado 4 18 01 29 29 02 09 05 iento del sistema de inform Monitoring osto ación SIGAE CO-PNF-17816-CS-QCBS / Component 2 - Forest Gov Selección basad Fortalecimiento del SISA - 2017-08-0 2017-08- 2017-09- 2017-10- 2017-10- 2017-10- 2017-11- 2018-05- TF / 18478 ernance, Management and Posterior a en calidad y c Open - National 51,852.00 0.00 Cancelado Monitoreo para la trazabilid 8 23 06 06 11 23 07 06 Monitoring osto ad de la madera - Corpoam azonia CO-PNF-75480-CS-CQS / D esarrollar una expedición ci entífica en la ventana Mesa Selección basad Component 1 - Protected y en el sector sur del Parqu a en calificacion 2018-09-2 2018-07- 2018-10- 2018-11- 2018-09- 2018-12- 2019-01- 2019-01- 2019-03- 2019-11- 2019-07- TF / 18478 Areas Management and Fi Posterior Open - National 83,071.00 69,759.36 Finalizado e. Que a su vez identifique es de consultor 0 31 11 23 27 23 31 17 06 20 18 nancial Sustainability oportunidades y aporte ele es mentos técnicos que fortal ezcan las líneas de investig ación y el Programa de Mo nitoreo CO-PNF-103506-CS-QCBS / Component 1 - Protected Selección basad 2019-06-1 2019-06- 2019-07- 2019-09- 2019-09- 2019-10- 2019-10- 2020-04- Elaboración del modelo de TF / A5789 Areas Management and Fi Posterior a en calidad y c Open - National 137,742.00 0.00 Cancelado 4 28 22 06 15 06 26 26 datos para el Sistema Integ nancial Sustainability osto rado de Gestión. CO-PNF-137107-CS-LCS / F ormular el Plan de Manejo del área protegida Natural Component 1 - Protected Selección basad Regional Miraflores Picacho 2019-10-3 2019-10- 2019-11- 2020-01- 2020-10- 2020-01- 2020-11- 2020-03- 2021-03- 2020-04- 2021-05- 2020-05- 2021-06- 2020-11- 2022-07- TF / A5789 Areas Management and Fi Posterior a en el menor c Open - National 129,032.00 105,050.14 Finalizado s bajo un esquema de coor 0 23 20 03 22 31 23 01 31 05 11 10 28 06 12 nancial Sustainability osto dinación interinstitucional, participación comunitaria, concertación social y forta mecimiento de capacidade s de las partes interesadas CO-PNF-137133-CS-CQS / Selección basad Diseño de un Sistema integ Component 1 - Protected a en calificacion 2020-08-3 2020-09- 2020-11- 2020-12- 2021-01- 2021-09- rado de gestión administrat TF / A5789 Areas Management and Fi Posterior Open - National 17,419.00 0.00 Cancelado es de consultor 1 21 04 04 08 06 iva, financiera y técnica par nancial Sustainability es a FPN: levantamiento de re querimientos internos y ext ernos. CO-PNF-178662-CS-CQS / Auditoría de los recursos a Component 4 - Project Coo Selección basad dministrados y pagados po rdination, Management, M a en calificacion 2020-07-0 2020-07- 2020-07- 2020-09- 2020-09- 2020-10- 2020-11- 2020-11- 2020-12- 2021-02- 2021-03- r Patrimonio Natural y el In TF / A5789 Posterior Open - National 14,516.00 11,658.40 Finalizado onitoring and Evaluation ( es de consultor 3 02 24 06 23 06 13 03 14 16 14 stituto SINCHI bajo el (P158 M&E) es 003-TFA5789) de la financi ación adicional y GEF PPG No. TF0B1287-CO del Proye cto CO-PNF-184783-CS-CQS / Diagnosticar, definir y dise ñar la Arquitectura Empres Selección basad arial de Patrimonio Natural, Component 1 - Protected a en calificacion 2020-09-3 2021-05- 2020-10- 2020-12- 2022-01- 2021-01- 2022-06- 2021-01- 2022-06- 2021-07- 2023-01- evaluar las herramientas te TF / A5789 Areas Management and Fi Posterior Open - National 50,746.00 44,133.70 Finalizado es de consultor 0 28 21 04 13 03 01 24 27 23 16 cnológicas actuales, propo nancial Sustainability es ner y definir escenarios de integración en un Sistema de Información funcional, s eguro y eficiente para el pr ocesamient CO-PNF-405725-CS-CQS / Auditoría de los recursos a Component 4 - Project Coo Selección basad dministrados por Patrimoni rdination, Management, M a en calificacion 2024-02-2 2024-02- 2024-03- 2024-04- 2024-03- 2024-05- 2024-05- 2024-06- 2024-05- 2024-10- o Natural y el Instituto SINC TF / B5182 Posterior Open - National 12,307.69 0.00 Firmado onitoring and Evaluation ( es de consultor 3 09 15 28 26 28 03 14 20 12 HI bajo el (TFA5789) de la M&E) es primera financiación adicio nal y (TF0B5182) de la seg unda financiación adicional del Proyecto “. CO-PNF-458283-CS-CQS / Recolectar y sistematizar in formación primaria sobre a Selección basad Component 3 - Sectoral Pr ccesibilidad fluvial y terrest a en calificacion 2024-12-2 2024-12- 2025-01- 2025-03- 2025-04- 2025-04- 2025-09- TF / B5182 ograms for Sustainable La Posterior Open - National 32,564.10 0.00 En ejecución re, y características socioe es de consultor 7 27 17 02 01 26 23 ndscape Management conómicas y biofísicas al in es terior de un área ventana d entro de la cuenca de los rí os Caquetá y/o Guaviare en la Amazonía colombiana. INDIVIDUAL CONSULTANTS Activity Reference No Invitation to Identif Loan / Credit Market Appro Contract Type Estimated A Actual Amo Process Stat Draft Negotiated C Contract Completio . / Description Component Review Type Method Terms of Reference ied/Selected Consu Signed Contract No. ach mount (US$) unt (US$) us ontract n ltant Planned Actual Planne Actual Planne Actual Planne Actual Planne Actual d d d d CO-PNF-17988-CS-INDV / P Component 3 - Sectoral Pr rofesional para la coordina 2017-02-1 2017-02- 2017-03- 2017-03- 2017-03- 2017-12- 2018-02- TF / 18478 ograms for Sustainable La Posterior Individual Limited 26,667.00 25,174.80 Finalizado ción y desarrollo de las acti 5 22 01 16 31 20 02 ndscape Management vidades del resultado 3.2 - 2017 CO-PNF-17984-CS-INDV / C Component 3 - Sectoral Pr onsultoria para coordinar la 2017-02-1 2017-02- 2017-02- 2017-03- 2017-03- 2017-03- 2017-12- 2018-01- TF / 18478 ograms for Sustainable La Posterior Individual Limited 22,407.00 21,264.54 Finalizado ruta de ampliación de PNN 5 27 22 01 16 31 20 09 ndscape Management SCH en los departamentos de Guaviare y Caqueta CO-PNF-17966-CS-INDV / C onsultoría para preparar un Component 4 - Project Coo documento de caracterizac rdination, Management, M 2017-07-1 2017-07- 2017-07- 2017-08- 2016-10- 2017-09- 2016-11- TF / 18478 Posterior Individual Limited 3,704.00 3,580.40 Finalizado ión demográfica, económic onitoring and Evaluation ( 9 24 31 11 20 11 25 a y del estado legal del terr M&E) itorio para el polígono de in tervención del GEF 6. CO-PNF-17967-CS-INDV / C onsultoría para Identificar y definir el esquema concept Component 4 - Project Coo ual y metodológico necesar rdination, Management, M 2017-07-1 2017-07- 2017-07- 2017-08- 2016-11- 2017-09- 2016-12- TF / 18478 Posterior Individual Limited 3,704.00 3,580.40 Finalizado io para organizar una red d onitoring and Evaluation ( 9 24 31 14 22 13 21 e sitios intensivos de monit M&E) oreo que genere informació n científica sobre el papel d e los bosques naturales de la Amazonía. CO-PNF-18001-CS-INDV / I Component 1 - Protected 2017-07-2 2017-01- 2017-07- 2017-08- 2017-09- 2017-03- 2017-10- 2017-09- nterventoria adecuación se TF / 18478 Areas Management and Fi Posterior Individual Limited 12,393.00 11,699.49 Finalizado 1 16 26 16 20 10 10 03 de San José del Guaviare nancial Sustainability CO-PNF-18004-CS-INDV / P Component 3 - Sectoral Pr 2017-06-1 2017-02- 2017-08- 2017-08- 2017-09- 2017-03- 2017-12- 2018-01- rofesionales SIG - CDA Ord TF / 18478 ograms for Sustainable La Posterior Individual Open 14,815.00 14,038.40 Finalizado 3 27 01 22 26 31 20 07 enamiento - 2017 ndscape Management CO-PNF-21090-CS-INDV / C onsultor para la generación de cartografía de las actua Component 3 - Sectoral Pr 2017-08-0 2017-08- 2017-08- 2017-08- 2017-08- 2017-08- 2017-10- 2017-11- ciones adelantadas en el m TF / 18478 ograms for Sustainable La Posterior Individual Direct 4,074.00 3,337.07 Finalizado 1 18 04 11 22 30 21 14 arco de la estrategia integr ndscape Management al de control de la deforest ación y la implementación de los acuerdos de paz. CO-PNF-21094-CS-INDV / P rofesional para seguimient Component 2 - Forest Gov 2017-08-0 2017-08- 2017-08- 2017-09- 2017-11- 2017-12- 2018-11- o de actividades técnicas y TF / 18478 ernance, Management and Posterior Individual Open 8,000.00 22,657.32 Finalizado 1 18 25 04 23 28 22 ejecución del componente Monitoring de monitoreo. Segundo se mestre. CO-PNF-21481-CS-INDV / C onsultoría para la generaci ón de la cartografía de las Component 3 - Sectoral Pr actuaciones adelantadas e 2017-09-0 2017-09- 2017-10- 2017-10- 2018-06- 2018-01- 2019-02- TF / 18478 ograms for Sustainable La Posterior Individual Limited 4,444.00 4,203.84 Finalizado n el marco de la Estrategia 5 10 01 22 13 20 05 ndscape Management Integral de Control de la De forestación en el Municipio de Calamar, El Retorno, Sa n Vicente, Solano y Cartag ena del Chairá. CO-PNF-17977-CS-CDS / Pr ofesional en sistema de inf ormación geográfica y sens Component 2 - Forest Gov 2017-02-1 2017-02- 2017-02- 2017-02- 2017-03- 2017-03- 2017-12- 2017-04- ores remotos que adelante TF / 18478 ernance, Management and Posterior Individual Direct 18,578.00 3,426.57 Finalizado 5 13 18 21 04 05 20 15 el procesamiento de imáge Monitoring nes y reporte de alertas te mpranos de deforestacion - Guaviare CDA- 2017 CO-PNF-17991-CS-CDS / Pr Component 2 - Forest Gov 2017-02-1 2017-03- 2017-03- 2017-03- 2017-04- 2017-04- 2017-12- 2017-06- ofesional para coordinación TF / 18478 ernance, Management and Posterior Individual Direct 18,864.00 5,754.08 Finalizado 5 31 11 25 29 18 20 14 y desarrollo PPI PNN - 2017 Monitoring CO-PNF-26455-CS-INDV / P rofesional especializado en sistemas de información ge Component 2 - Forest Gov 2017-01-1 2017-01- 2017-02- 2017-02- 2017-03- 2017-12- 2017-12- ográfica, sensores remotos, TF / 18478 ernance, Management and Posterior Individual Direct 41,280.00 24,572.67 Finalizado 3 27 03 15 16 20 27 y monitoreo de recursos na Monitoring turales encargados en cont rol Temático de Calidad - S YMBC - 2017 CO-PNF-26462-CS-INDV / A Component 2 - Forest Gov dministración, actualizació 2017-01-0 2017-02- 2017-01- 2017-01- 2017-02- 2017-02- 2017-12- 2017-12- TF / 18478 ernance, Management and Posterior Individual Direct 38,400.00 36,441.45 Finalizado n y operación de la platafor 9 13 23 30 15 22 20 27 Monitoring ma tecnologica del SMBYC CO-PNF-26465-CS-INDV / E Component 2 - Forest Gov 2017-01-0 2017-02- 2017-01- 2017-02- 2017-02- 2017-02- 2017-12- 2017-12- xperto en monitoreo ,repor TF / 18478 ernance, Management and Posterior Individual Direct 36,000.00 34,163.86 Finalizado 9 13 25 02 15 22 20 27 te y verificación - MVR del Monitoring SMBYC - 2017 Page 5 CO-PNF-26466-CS-INDV / P rofesional experto en estru cturador de Información, q Component 2 - Forest Gov 2017-01-0 2017-07- 2017-01- 2017-02- 2017-02- 2017-02- 2017-12- 2017-12- ue apoyara la generación, TF / 18478 ernance, Management and Posterior Individual Direct 21,778.00 20,512.97 Finalizado 9 02 25 02 15 22 20 27 estandarización y documen Monitoring tación de la información ge ográfica de deforestacion a nivel nacional y subnaciona l - 2017 CO-PNF-26464-CS-INDV / P rofesional en ciencias natur ales especializado en la Ge Component 3 - Sectoral Pr 2017-01-1 2017-01- 2017-02- 2017-03- 2017-03- 2017-09- 2018-01- stión de Áreas Protegidas, TF / 18478 ograms for Sustainable La Posterior Individual Direct 20,370.00 19,302.80 Finalizado 0 20 10 17 22 13 22 como apoyo a la Corporaci ndscape Management ón para el Desarrollo Soste nible del Nor Oriente Amaz ónico- CDA - 2017 CO-PNF-26467-CS-INDV / P rofesional en sistema de inf ormación geográfica y sens Component 2 - Forest Gov 2017-01-0 2017-02- 2017-01- 2017-02- 2017-02- 2017-02- 2017-12- 2017-12- ores remotos que adelante TF / 18478 ernance, Management and Posterior Individual Direct 18,578.00 17,441.13 Finalizado 9 13 25 02 15 22 20 27 el procesamiento de imáge Monitoring nes y reporte de alertas te mpranos de deforestacion CORPOAMAZONIA- Caqueta - 2017 CO-PNF-26459-CS-INDV / L Component 2 - Forest Gov 2017-01-0 2017-02- 2017-01- 2017-02- 2017-02- 2017-02- 2017-12- 2017-12- TF / 18478 Posterior Individual Direct 40,889.00 38,745.98 Finalizado ider Temático de Carbono ernance, Management and 9 13 25 02 15 22 20 27 Monitoring CO-PNF-26461-CS-INDV / E Component 1 - Protected 2017-01-0 2017-01- 2017-02- 2017-02- 2017-03- 2017-12- 2017-12- nlace PNN Serranía de Chiri TF / 18478 Areas Management and Fi Posterior Individual Direct 30,531.00 28,822.63 Finalizado 9 25 02 15 02 20 29 biquete PNN - 2017 nancial Sustainability CO-PNF-26458-CS-INDV / P Component 4 - Project Coo 2017-01-0 2017-01- 2017-02- 2017-02- 2017-03- 2017-12- 2017-12- rofesional seguimiento - 20 TF / 18478 rdination, Management, M Posterior Individual Direct 40,422.00 38,360.53 Finalizado 9 26 03 23 02 20 27 17 onitoring and Evaluation ( M&E) CO-PNF-26463-CS-INDV / G Component 4 - Project Coo EF 6. Consolidación plan d rdination, Management, M 2016-10-0 2016-10- 2016-10- 2016-11- 2017-07- 2016-12- 2017-09- TF / 18478 Posterior Individual Direct 1,019.00 1,923.08 Finalizado e adquisiciones, elaboració onitoring and Evaluation ( 1 17 23 02 03 30 01 n manual operativo, borrad M&E) or acuerdo interinstituciona l CO-PNF-31993-CS-INDV / E Component 4 - Project Coo 2017-01-0 2017-01- 2017-01- 2017-02- 2017-03- 2017-12- 2017-12- specialista financiero - 201 TF / 18478 rdination, Management, M Posterior Individual Direct 27,685.00 26,195.80 Finalizado 2 10 15 23 02 20 29 7 VF onitoring and Evaluation ( M&E) CO-PNF-32008-CS-INDV / P rofesional para seguimient Component 2 - Forest Gov 2017-01-0 2017-02- 2017-01- 2017-01- 2017-02- 2017-02- 2017-12- 2017-12- o de actividades administra TF / 18478 ernance, Management and Posterior Individual Direct 24,000.00 22,775.90 Finalizado 2 13 12 17 15 22 20 27 tivas y financieras del com Monitoring ponente de Monitoreo de B osques y Carbono CO-PNF-31987-CS-INDV / C Component 4 - Project Coo 2017-01-2 2017-01- 2017-01- 2017-02- 2017-03- 2017-12- 2017-12- oordinador general del pro TF / 18478 rdination, Management, M Posterior Individual Direct 52,311.00 49,643.04 Finalizado 0 25 30 23 02 02 27 yecto - 2017 onitoring and Evaluation ( M&E) CO-PNF-31985-CS-INDV / A Component 4 - Project Coo 2016-12-2 2016-12- 2017-01- 2017-01- 2015-06- 2017-12- 2019-06- sistente administrativo - 20 TF / 18478 rdination, Management, M Posterior Individual Direct 9,333.00 4,296.36 Finalizado 9 31 01 04 07 20 05 17 onitoring and Evaluation ( M&E) CO-PNF-31995-CS-INDV / P rofesional en ciencias natur Component 2 - Forest Gov 2017-01-0 2017-01- 2017-01- 2017-02- 2017-02- 2017-12- 2018-01- ales para seguimiento de a TF / 18478 ernance, Management and Posterior Individual Direct 14,000.00 22,775.90 Finalizado 2 07 12 15 22 20 21 ctividades técnicas y ejecu Monitoring cion del componente de Mo nitoreo - 2017 CO-PNF-31983-CS-INDV / P rofesional en sistema de inf ormación geográfica y sens Component 2 - Forest Gov 2017-01-0 2017-02- 2017-01- 2017-01- 2017-01- 2017-02- 2017-12- 2017-12- ores remotos que adelante TF / 18478 ernance, Management and Posterior Individual Direct 18,578.00 17,441.13 Finalizado 2 13 07 12 19 22 20 27 el procesamiento de imáge Monitoring nes y reporte de alertas te mpranos de deforestacion - Guaviare CDA- 2017 CO-PNF-31984-CS-INDV / P rofesional acompañamient Component 2 - Forest Gov 2017-03-2 2017-04- 2017-04- 2017-05- 2017-05- 2017-12- 2018-01- o resguardos indigenas pla TF / 18478 ernance, Management and Posterior Individual Direct 11,852.00 11,188.80 Finalizado 8 07 12 15 21 20 21 n cultural de ordenamiento Monitoring y manejo y sistematización de chagras 2017 CO-PNF-32010-CS-INDV / P Component 1 - Protected 2017-01-0 2017-01- 2017-01- 2017-02- 2017-02- 2017-12- 2018-01- rofesional Administrativo P TF / 18478 Areas Management and Fi Posterior Individual Direct 21,400.00 20,687.55 Finalizado 1 11 16 15 22 20 21 NN_DTAM - 2017 nancial Sustainability CO-PNF-34497-CS-INDV / P rofesional SIG PNNSCH, Bri ndar los apoyos técnicos e Component 1 - Protected n sistemas de información 2017-11-1 2017-11- 2017-11- 2017-11- 2017-12- 2017-03- 2018-08- 2018-01- TF / 18478 Areas Management and Fi Posterior Individual Direct 8,587.00 21,005.57 Finalizado geográfica para la generaci 5 01 19 24 08 25 10 26 nancial Sustainability ón de insumos cartográfico s, análisis espaciales y elab oración de aportes técnicos al equipo involucrado en el proyecto GEF y la DTAM CO-PNF-17963-CS-INDV / E Component 4 - Project Coo 2017-07-2 2017-08- 2017-08- 2017-09- 2018-01- 2018-09- 2019-01- specialista de Adquisicione TF / 18478 rdination, Management, M Posterior Individual Limited 44,444.00 42,062.40 Finalizado 6 19 24 01 21 01 16 s - 2017 onitoring and Evaluation ( M&E) CO-PNF-17979-CS-INDV / P Component 1 - Protected 2017-02-1 2017-03- 2017-02- 2017-01- 2017-03- 2017-03- 2017-03- 2017-12- 2017-12- rofesional SIG PNNSCH - 20 TF / 18478 Areas Management and Fi Posterior Individual Limited 22,131.00 20,974.49 Finalizado 5 16 22 20 01 16 25 20 31 17 nancial Sustainability CO-PNF-34457-CS-INDV / E xperto análisis de conectivi dad ecosístemica- Formula Component 3 - Sectoral Pr 2017-11-1 2017-11- 2017-12- 2018-01- 2018-03- 2018-05- 2018-09- r una metodología homolog TF / 18478 ograms for Sustainable La Posterior Individual Limited 17,778.00 16,984.80 Finalizado 5 30 14 02 11 30 05 ada para realizar los estudi ndscape Management os de conectividad ecológic a del paisaje regional , subr egional y local. CO-PNF-17997-CS-CDS / C Component 2 - Forest Gov Selección direct onsultoria Generacion de in 2017-06-1 2017-07- 2017-09- 2017-11- 2018-01- 2018-04- TF / 18478 ernance, Management and Posterior a de consultore Direct 83,988.00 81,192.17 Finalizado formación de campo relaci 3 23 03 02 31 01 Monitoring s onada con el monitoreo del Carbono CO-PNF-26457-CS-INDV / P rofesional en ciencias natur Component 3 - Sectoral Pr 2017-03-0 2017-04- 2017-03- 2017-03- 2017-04- 2017-04- 2017-12- 2017-12- ales especializado en la Ge TF / 18478 ograms for Sustainable La Posterior Individual Direct 25,000.00 23,689.80 Finalizado 2 04 18 28 18 27 20 31 stión de Áreas Protegidas, ndscape Management como apoyo a Corpoamazo nía CO-PNF-26460-CS-INDV / P rofesional especializado en Component 2 - Forest Gov sistema de informacion geo 2017-01-1 2017-02- 2017-01- 2017-02- 2017-02- 2017-03- 2017-12- 2017-12- TF / 18478 ernance, Management and Posterior Individual Direct 41,280.00 24,536.32 Finalizado gráfica, sensores remotos / 7 23 31 05 15 19 20 31 Monitoring monitoreo de recursos natu rales que lidera el procesa miento digital de imagenes - 2017 CO-PNF-26456-CS-INDV / E Component 3 - Sectoral Pr 2017-01-0 2017-01- 2017-01- 2017-02- 2017-02- 2017-03- 2017-12- 2017-12- xperto en Áreas Protegidas TF / 18478 ograms for Sustainable La Posterior Individual Direct 30,531.00 28,822.63 Finalizado 9 10 25 02 23 06 20 31 PNN - 2017 ndscape Management CO-PNF-34496-CS-INDV / I Component 1 - Protected 2017-11-0 2017-11- 2017-11- 2017-12- 2018-04- 2018-09- 2019-01- nterventoria centro de inve TF / 18478 Areas Management and Fi Posterior Individual Limited 21,667.00 20,247.80 Finalizado 6 21 26 11 27 07 09 stigación Puerto Abeja nancial Sustainability CO-PNF-38842-CS-INDV / P Component 1 - Protected 2017-11-3 2017-12- 2017-12- 2018-01- 2018-01- 2018-06- 2019-01- NN-Profesional de enlace e TF / 18478 Areas Management and Fi Posterior Individual Direct 15,750.00 15,419.57 Finalizado 0 10 15 03 09 30 04 ntre PNN DTAM y áreas pro nancial Sustainability tegidas-2018 CO-PNF-38845-CS-INDV / L íder junior en procesamient Component 2 - Forest Gov 2017-11-3 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2018-12- o digital para capacitación TF / 18478 ernance, Management and Posterior Individual Direct 26,503.00 25,825.93 Finalizado 0 10 15 03 09 20 07 y transferencia del SMBYC Monitoring a autoridades ambientales - 2018 CO-PNF-38849-CS-INDV / P rofesional especializado en Component 2 - Forest Gov sistema de información geo 2017-11-3 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2018-12- TF / 18478 ernance, Management and Posterior Individual Direct 42,591.00 41,308.83 Finalizado gráfica, sensores remotos / 0 10 15 03 09 20 27 Monitoring monitoreo de recursos natu rales que lidera el procesa miento digital de imágenes - 2018 CO-PNF-38851-CS-INDV / E Component 2 - Forest Gov 2017-11-3 2017-12- 2018-01- 2018-01- 2018-05- 2018-12- 2018-12- xperto en Monitoreo, Repor TF / 18478 ernance, Management and Posterior Individual Limited 37,144.00 22,261.68 Finalizado 0 30 04 21 13 20 13 te y Verificación - MVR -201 Monitoring 8 CO-PNF-38854-CS-INDV / L Component 2 - Forest Gov 2017-11-3 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2018-12- TF / 18478 Posterior Individual Direct 39,429.00 38,780.21 Finalizado íder Temático en Carbono- ernance, Management and 0 10 15 03 09 20 27 2018 Monitoring CO-PNF-38855-CS-INDV / P rofesional especializado en Component 2 - Forest Gov SIG, sensores remotos, y m 2017-11-3 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2018-12- TF / 18478 ernance, Management and Posterior Individual Direct 32,057.00 31,462.68 Finalizado onitoreo de recursos natur 0 10 15 03 09 20 27 Monitoring ales encargados en control Temático de Calidad - SYM BC- 2018- CO-PNF-38857-CS-INDV / C Component 2 - Forest Gov 2017-11-3 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2019-01- OORDINADOR DESARROLL TF / 18478 ernance, Management and Posterior Individual Direct 33,364.00 33,010.89 Finalizado 0 10 15 03 09 20 04 O DE PLANES DE PUEBLOS Monitoring INDÍGENAS- 2018 CO-PNF-38860-CS-INDV / P Component 2 - Forest Gov ROFESIONAL FORMULACIÓ 2017-11-3 2017-12- 2017-12- 2018-01- 2018-01- 2018-11- 2018-12- TF / 18478 ernance, Management and Posterior Individual Direct 19,643.00 19,319.85 Finalizado N PLAN CULTURAL DE MAN 0 10 15 03 09 20 27 Monitoring EJO Y SISTEMATIZACION DE CHAGRAS- 2018 CO-PNF-38868-CS-INDV / C Component 2 - Forest Gov 2017-11-3 2017-12- 2017-12- 2018-01- 2018-01- 2018-05- 2018-06- onsultoría para el diseño d TF / 18478 ernance, Management and Posterior Individual Direct 8,929.00 8,741.25 Finalizado 0 07 12 02 22 30 20 el diplomado gobernanza y Monitoring gobierno propio CO-PNF-38870-CS-INDV / C onsultoría para el diseño d Component 2 - Forest Gov el componente pedagógico 2017-11-3 2017-12- 2017-12- 2018-01- 2018-01- 2018-05- 2018-06- TF / 18478 ernance, Management and Posterior Individual Direct 8,929.00 8,758.00 Finalizado y didáctico de los diplomad 0 10 17 02 12 30 10 Monitoring os para la formación en go bernanza indígena y diálog o de saberes CO-PNF-38986-CS-INDV / C onsultoría para el diseño d Component 2 - Forest Gov 2017-12-0 2017-12- 2017-12- 2018-01- 2018-02- 2018-04- 2018-07- e una plataforma para la f TF / 18478 ernance, Management and Posterior Individual Direct 16,071.00 15,734.25 Finalizado 1 11 18 02 08 26 05 ormación en gobernanza in Monitoring dígena y gestión del conoc imiento de los bosques CO-PNF-38990-CS-INDV / C onsultoria para el diseño d Component 2 - Forest Gov 2017-12-0 2017-12- 2017-12- 2018-01- 2018-01- 2018-05- 2018-06- el diplomado en proyectos TF / 18478 ernance, Management and Posterior Individual Direct 8,929.00 8,741.25 Finalizado 1 11 18 02 21 30 17 productivos y alternativas l Monitoring ocales generadoras de ingr esos. CO-PNF-38991-CS-INDV / C Component 2 - Forest Gov onsultoría para el diseño d 2017-12-0 2017-12- 2017-12- 2018-01- 2018-01- 2018-05- 2018-06- TF / 18478 ernance, Management and Posterior Individual Direct 8,929.00 8,741.25 Finalizado el diplomado en estrategia 1 11 18 02 21 30 13 Monitoring s para la convivencia y el b uen vivir. CO-PNF-38995-CS-INDV / P rofesional CDA Ruta Declar atoria 2018- Liderar en rep resentación de la CDA el pr Component 3 - Sectoral Pr 2017-12-0 2017-12- 2017-12- 2018-01- 2018-03- 2018-12- 2018-09- oceso de implementación d TF / 18478 ograms for Sustainable La Posterior Individual Direct 11,464.00 11,764.65 Finalizado 1 11 18 02 08 20 01 e la ruta declaratoria de nu ndscape Management evas áreas protegidas regi onales y la gestión de las p rioridades y estrategias de conservación existentes en el departame CO-PNF-39001-CS-INDV / P Component 3 - Sectoral Pr rofesional de apoyo para l 2017-12-0 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2018-12- TF / 18478 ograms for Sustainable La Posterior Individual Direct 33,017.00 32,324.44 Finalizado a implementación de acuer 1 11 18 02 09 20 27 ndscape Management dos con el sector de infraes tructura e hidrocarburos CO-PNF-39002-CS-INDV / C onsultoria jurídica para la i Component 3 - Sectoral Pr 2017-12-0 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2018-12- nclusión de corredores de c TF / 18478 ograms for Sustainable La Posterior Individual Direct 42,857.00 41,958.00 Finalizado 4 14 21 02 09 20 27 onectividad ecológica com ndscape Management o determinante ambiental en evaluación de proyectos CO-PNF-39009-CS-INDV / P Component 4 - Project Coo 2017-12-0 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2018-12- rofesional de seguimiento y TF / 18478 rdination, Management, M Posterior Individual Direct 41,704.00 40,829.33 Finalizado 1 11 16 02 09 20 27 monitoreo- 2018 onitoring and Evaluation ( M&E) CO-PNF-39010-CS-INDV / C Component 4 - Project Coo 2017-12-0 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2019-01- oordinación general del pro TF / 18478 rdination, Management, M Posterior Individual Direct 57,857.00 56,784.24 Finalizado 1 11 16 04 09 20 04 yecto- 2018 onitoring and Evaluation ( M&E) Component 4 - Project Coo CO-PNF-39014-CS-INDV / E 2017-12-0 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2018-12- TF / 18478 rdination, Management, M Posterior Individual Direct 32,036.00 31,508.92 Finalizado specialista financiera- 2018 1 11 16 02 09 20 27 onitoring and Evaluation ( M&E) CO-PNF-43099-CS-INDV / C onsultoría para la elaboraci ón de los procedimientos q Component 3 - Sectoral Pr ue le compete adelantar a l 2018-01-1 2018-01- 2018-02- 2018-03- 2018-05- 2019-02- 2019-05- TF / 18478 ograms for Sustainable La Posterior Individual Limited 17,679.00 20,813.94 Finalizado a CDA, en materia de eval 6 24 14 21 05 21 04 ndscape Management uación y seguimiento ambi ental y ejercicio de control y vigilancia de intervención en el Departamento del Gu aviare CO-PNF-43106-CS-INDV / C onsultoría para la elaboraci ón de procedimientos que l e compete adelantar a COR Component 3 - Sectoral Pr 2018-01-1 2018-01- 2018-02- 2018-03- 2018-05- 2019-02- 2019-04- MACARENA, en materia de TF / 18478 ograms for Sustainable La Posterior Individual Limited 17,679.00 17,491.32 Finalizado 6 24 14 21 25 21 24 evaluación y seguimiento a ndscape Management mbiental y ejercicio de cont rol y vigilancia de intervenc iones en infraestructura de transporte en el Departam ento Sur del Me CO-PNF-43111-CS-INDV / C onsultoría para la elaboraci ón de procedimientos que l e compete adelantar a COR Component 3 - Sectoral Pr 2018-01-1 2018-01- 2018-02- 2018-03- 2018-05- 2019-02- 2019-07- POAMAZONIA, en materia d TF / 18478 ograms for Sustainable La Posterior Individual Limited 17,769.00 20,813.94 Finalizado 6 24 14 21 05 21 09 e evaluación y seguimiento ndscape Management ambiental y ejercicio de co ntrol y vigilancia de interve nciones en infraestructura de transporte en el Depart amento Putumayo CO-PNF-41751-CS-INDV / C onsultoría para la elaboraci Component 3 - Sectoral Pr ón de un estudio de caract 2017-12-2 2018-01- 2018-01- 2018-02- 2018-04- TF / 18478 ograms for Sustainable La Posterior Individual Limited 3,571.00 0.00 Cancelado erización del potencial de p 9 03 24 28 29 ndscape Management roducción y mercadeo de e species maderables y no m aderables de bosque. CO-PNF-41752-CS-INDV / C onsultoría para el diseño d Component 3 - Sectoral Pr el arreglo institucional (role 2017-12-2 2018-01- 2018-01- 2018-02- 2018-04- TF / 18478 ograms for Sustainable La Posterior Individual Limited 3,571.00 0.00 Cancelado s de autoridades ambiental 9 03 24 28 29 ndscape Management es y territoriales, organizac iones sociales) para el fom ento del manejo forestal so stenible CO-PNF-41749-CS-INDV / C Component 3 - Sectoral Pr onsultoría para la evaluació 2017-12-2 2018-01- 2018-01- 2018-02- 2018-05- TF / 18478 ograms for Sustainable La Posterior Individual Limited 6,429.00 0.00 Cancelado n de prefactibilidad de una 9 03 17 21 22 ndscape Management iniciativa de manejo diversi ficado del bosque CO-PNF-55711-CS-INDV / s ervicios profesionales para Component 4 - Project Coo realizar la caracterización b rdination, Management, M 2018-04-2 2018-05- 2018-05- 2018-06- 2018-06- 2018-10- 2018-10- TF / 18478 Posterior Individual Limited 10,714.00 10,509.60 Finalizado iofísica de los motores de f onitoring and Evaluation ( 6 01 22 26 15 26 15 ragmentación, agentes, ca M&E) usas directas y énfasis en c ausas subyacentes a nivel r egional. CO-PNF-55712-CS-INDV / R ealizar la caracterización s ocial de los motores de fra gmentación, agentes, caus Component 3 - Sectoral Pr 2018-04-2 2018-04- 2018-05- 2018-06- 2018-06- 2018-10- 2018-10- as directas y énfasis en cau TF / 18478 ograms for Sustainable La Posterior Individual Limited 10,714.00 10,509.60 Finalizado 5 30 21 25 15 26 15 sas subyacentes a nivel reg ndscape Management ional y la identificación de oportunidades para atenua r los riesgos frente a la frag mentación y potenciar las f ortaleza CO-PNF-55713-CS-INDV / S ervicios profesionales para aplicar herramientas de an álisis espacial e interpretac Component 3 - Sectoral Pr 2018-04-2 2018-04- 2018-05- 2018-06- 2018-06- 2018-10- 2018-10- ión de coberturas de la tier TF / 18478 ograms for Sustainable La Posterior Individual Limited 10,714.00 10,509.60 Finalizado 5 30 21 25 15 25 15 ra, para realizar el control ndscape Management de calidad de la interpretac ión de coberturas de la tier ra según metodología Corin e Land Cover, de acuerdo a los p CO-PNF-55714-CS-INDV / P restar los servicios profesio nales para realizar la gestió Component 3 - Sectoral Pr n, análisis y modelación de 2018-04-2 2018-04- 2018-05- 2018-06- 2018-06- 2018-10- 2018-10- TF / 18478 ograms for Sustainable La Posterior Individual Limited 10,714.00 10,509.60 Finalizado la información georreferen 5 30 21 25 15 25 15 ndscape Management ciada, para realizar el análi sis de conectividad y motor es de fragmentación con é nfasis en causas subyacent es a nivel regional. CO-PNF-54326-CS-CDS / A Component 4 - Project Coo Selección direct 2018-05-2 2018-05- 2018-06- 2018-07- 2018-08- 2018-09- 2018-11- 2018-12- UDITORIA EXTERNA PARA E TF / 18478 rdination, Management, M Posterior a de consultore Direct 12,600.00 9,340.80 Finalizado 4 04 03 09 16 08 30 05 L PROYECTO GEF-CA AÑO onitoring and Evaluation ( s 2018 M&E) CO-PNF-63402-CS-INDV / C oordinar, orientar y liderar l Component 3 - Sectoral Pr 2018-07-0 2018-07- 2018-07- 2018-08- 2018-08- 2019-08- 2019-08- a implementación de los ac TF / 18478 ograms for Sustainable La Posterior Individual Limited 28,965.00 27,140.40 Finalizado 2 07 21 13 10 12 15 uerdos de conservación, re ndscape Management stauración y no deforestaci ón - CORPOAMAZONIA CO-PNF-17965-CS-INDV / C Component 4 - Project Coo onsultoria para realizar la rdination, Management, M 2018-04-0 2018-05- 2018-05- 2018-06- 2018-07- TF / 18478 Posterior Individual Open 16,071.00 0.00 Cancelado Misión de Evaluación de Me onitoring and Evaluation ( 8 04 19 02 02 dio Término del Proyecto G M&E) EF Corazón de la Amazonia CO-PNF-38992-CS-INDV / C oordinación editorial y dise Component 2 - Forest Gov ño, edición y diagramación- 2017-12-0 2017-12- 2017-12- 2018-01- 2018-06- TF / 18478 ernance, Management and Posterior Individual Limited 14,286.00 0.00 Cancelado estructuración de la platafo 1 07 21 19 19 Monitoring rma intercultural para la for mación de gobernanza indí gena y diálogo de saberes. CO-PNF-54443-CS-INDV / P rofesional en mercadeo, co mercio exterior, ciencias ec Component 3 - Sectoral Pr onómicas o carreras afines 2018-08-3 2019-01- 2018-09- 2019-03- 2018-09- 2019-03- 2018-10- 2019-03- 2019-05- 2019-07- TF / 18478 ograms for Sustainable La Posterior Individual Limited 14,814.00 11,561.20 Finalizado que formule la estrategia d 0 15 04 22 25 22 30 28 01 31 ndscape Management e mercadeo y de encadena miento productivo de made rables y no maderables pri orizados en el área de juris dicción de ASOCAPRICHO. Page 6 CO-PNF-54442-CS-INDV / P rofesional en biólogía o car Component 3 - Sectoral Pr reras afines que realicela c 2018-08-1 2018-08- 2018-09- 2018-10- 2018-09- 2019-04- 2019-04- TF / 18478 ograms for Sustainable La Posterior Individual Limited 14,444.00 12,600.90 Finalizado aracterización faunística y 6 21 11 16 20 17 30 ndscape Management sitios de ecoturismo en las veredas de jurisdicción de ASOCAPRICO. CO-PNF-55709-CS-INDV / P rofesional en comunicación social que genere contenid Component 4 - Project Coo os para los distintos medio rdination, Management, M 2018-08-1 2018-08- 2018-08- 2018-09- 2018-09- 2019-08- 2019-08- TF / 18478 Posterior Individual Limited 25,715.00 17,447.40 Finalizado s de comunicación, en el m onitoring and Evaluation ( 6 21 28 13 04 30 26 arco de la estrategia de co M&E) municación local de Visión Amazonia, que permitan m ostrar avances y resultados del Proyecto. CO-PNF-55710-CS-INDV / F ormulación de escenarios d e gobernanza para el mane jo integrado de estrategias Component 1 - Protected 2018-08-1 2018-07- 2018-08- 2018-08- 2018-09- 2018-12- 2018-10- 2018-12- 2019-05- 2019-07- de conservación y producci TF / 18478 Areas Management and Fi Posterior Individual Limited 14,285.00 8,829.87 Finalizado 5 13 20 15 05 12 03 19 21 06 ón sostenible, en el ámbito nancial Sustainability de los mosaicos Corazón d e la Amazonia y Piedemont e, definidos por Herencia C olombia, a partir de la cara cterización terr CO-PNF-41747-CS-INDV / C onsultoría para la construc ción de criterios ambiental Component 3 - Sectoral Pr 2017-12-2 2018-01- 2018-01- 2018-02- 2019-02- es para la elegibilidad y pri TF / 18478 ograms for Sustainable La Posterior Individual Limited 19,286.00 0.00 Cancelado 9 03 17 21 21 orización de proyectos de l ndscape Management a red básica/modos y logíst ica del Plan Maestro de Tra nsporte Intermodal. CO-PNF-41748-CS-INDV / C onsultoría para la construc ción de criterios ambiental Component 3 - Sectoral Pr 2017-12-2 2018-01- 2018-01- 2018-02- 2019-02- es para la elegibilidad y pri TF / 18478 ograms for Sustainable La Posterior Individual Limited 19,286.00 0.00 Cancelado 9 03 24 28 28 orización de proyectos de l ndscape Management a red de integración/modos logística del Plan Maestro d e Transporte intermodal. CO-PNF-41755-CS-INDV / A nálisis actualizado del esta Component 3 - Sectoral Pr do de la conectividad ecosi 2017-12-2 2018-01- 2018-01- 2018-02- 2018-06- TF / 18478 ograms for Sustainable La Posterior Individual Limited 10,714.00 0.00 Cancelado stémica Andes-Amazonia y 9 03 24 28 28 ndscape Management Orinoquia, útil para la gene ración de alertas y la comu nicación incidente con auto rid CO-PNF-21088-CS-INDV / E xperto en SIG - Análisis esp Component 3 - Sectoral Pr acial para el ordenamiento 2017-08-0 2017-08- 2017-08- 2017-09- 2017-11- TF / 18478 ograms for Sustainable La Posterior Individual Limited 5,093.00 0.00 Cancelado ambiental territorial dirigid 1 08 23 04 18 ndscape Management a a prevenir deforestación y aportar a la conectividad ecosistémica. Municipio de Miraflores. CO-PNF-20986-CS-INDV / P rofesional en SIG - Interpret Component 3 - Sectoral Pr 2017-08-0 2017-08- 2017-08- 2017-09- 2017-11- ación de imágenes satelital TF / 18478 ograms for Sustainable La Posterior Individual Limited 5,093.00 0.00 Cancelado 1 08 23 04 18 es como insumo para el or ndscape Management denamiento ambiental terri torial. Municipio de Miraflor es CO-PNF-41772-CS-INDV / E laboración de diseños nove Component 3 - Sectoral Pr 2018-08-2 2018-08- 2018-09- 2018-10- 2018-10- 2019-01- 2019-03- dosos de ingeniería para pa TF / 18478 ograms for Sustainable La Posterior Individual Limited 8,036.00 11,844.75 Finalizado 3 28 18 23 20 21 17 sos de fauna y señalización ndscape Management vial, en red vial de la Amaz onia CO-PNF-41771-CS-INDV / I dentificación y valoración d Component 3 - Sectoral Pr e impactos, costos y benefi 2018-08-2 2018-08- 2018-09- 2018-10- 2018-12- 2019-04- 2019-05- TF / 18478 ograms for Sustainable La Posterior Individual Limited 13,393.00 11,842.13 Finalizado cios socio-económicos de l 2 27 17 22 05 20 04 ndscape Management as vías priorizadas en los d epartamentos del Guaviare , Caquetá y sur del Meta. CO-PNF-41770-CS-INDV / D iseño de indicadores para v aloración de impactos de la Component 3 - Sectoral Pr red vial terciaria, formulaci 2018-08-2 2018-08- 2018-09- 2018-10- 2018-10- 2019-04- 2019-04- TF / 18478 ograms for Sustainable La Posterior Individual Limited 13,393.00 11,907.75 Finalizado ón de planes de mejoramie 3 28 18 23 23 21 13 ndscape Management nto de la conectividad e int egridad ecosistémicas y dis eño de pasos de fauna y se ñalética en infraestructura verde CO-PNF-41768-CS-INDV / V aloración de impactos de p royectos viales (carreteros Component 3 - Sectoral Pr 2018-08-1 2018-08- 2018-09- 2018-10- 2018-10- 2019-03- 2019-03- y fluviales) en la Amazonia TF / 18478 ograms for Sustainable La Posterior Individual Limited 13,393.00 11,907.75 Finalizado 6 21 11 16 23 15 22 colombiana, con énfasis en ndscape Management deforestación, cambios de uso, mercado de tierras y e conomías locales CO-PNF-41767-CS-INDV / A Component 3 - Sectoral Pr nálisis espacial de conglom 2018-08-2 2018-08- 2018-09- 2018-10- 2018-10- 2019-04- 2019-05- TF / 18478 ograms for Sustainable La Posterior Individual Limited 16,071.00 10,320.05 Finalizado erados viales e impactos a 3 28 18 23 31 21 11 ndscape Management mbientales y sociales. CO-PNF-41764-CS-INDV / A nálisis territorial y ambient al de la inversión pública e Component 3 - Sectoral Pr n vías de segundo y tercer 2018-08-2 2018-08- 2018-09- 2018-10- 2018-12- 2019-04- 2019-05- TF / 18478 ograms for Sustainable La Posterior Individual Limited 8,036.00 11,842.13 Finalizado orden, realizada por la naci 2 27 17 22 04 20 15 ndscape Management ón, el departamento y los municipios, en el sur del M eta y el Departamento del Caquetá, en el periodo 201 4-2020 CO-PNF-64186-CS-INDV / L iderar la continuidad en la operación del componente de monitoreo del carbono d Component 2 - Forest Gov 2018-07-1 2018-07- 2018-08- 2018-08- 2019-01- el SMBYC, que permita la g TF / 18478 ernance, Management and Posterior Individual Limited 19,286.00 0.00 Cancelado 2 17 01 26 26 eneración de información t Monitoring emática de monitoreo de lo s bosques, estimaciones de contenidos y flujos de carb ono y estimaciones de emi siones producto de CO-PNF-41753-CS-INDV / D iseño y aplicación de una metodología homologada p Component 3 - Sectoral Pr ara realizar los estudio de c 2017-12-2 2018-01- 2018-01- 2018-02- 2018-08- TF / 18478 ograms for Sustainable La Posterior Individual Limited 17,143.00 0.00 Cancelado onectividad ecológica el pa 9 03 24 28 27 ndscape Management isaje (tanto estructural com o funcional) en tres ámbito s de alcance: regional (Am azonía colombiana), subreg ional y local. CO-PNF-41754-CS-INDV / C aracterización sociocultural de los motores, agentes, ca Component 3 - Sectoral Pr 2017-12-2 2018-01- 2018-01- 2018-02- 2018-06- usas directas y causas sub TF / 18478 ograms for Sustainable La Posterior Individual Limited 10,714.00 0.00 Cancelado 9 03 24 28 28 yacentes de fragmentación ndscape Management de la conectividad ecosisté mica, a nivel regional, e ide ntificar oportunidades par CO-PNF-41743-CS-INDV / R ealizar la interlocución con las comunidades indígenas, Component 2 - Forest Gov establecer mecanismos de 2017-12-2 2018-01- 2018-01- 2018-02- 2018-07- TF / 18478 ernance, Management and Posterior Individual Limited 5,357.00 0.00 Cancelado relacionamiento y realizar 9 13 20 17 17 Monitoring el acompañamiento en ca mpo para el desarrollo de l as investigaciones locales que darán los insumos para los diplomados CO-PNF-41757-CS-INDV / C aracterización biofísica de Component 3 - Sectoral Pr 2017-12-2 2018-01- 2018-01- 2018-02- 2018-06- los motores de fragmentaci TF / 18478 ograms for Sustainable La Posterior Individual Limited 10,714.00 0.00 Cancelado 9 03 24 28 28 ón, agentes, causas directa ndscape Management s y énfasis en causas subya centes, a nivel regional. CO-PNF-41766-CS-INDV / A nálisis jurídico de los proye Component 3 - Sectoral Pr 2018-01-3 2018-02- 2018-02- 2018-04- 2018-09- ctos de construcción,mante TF / 18478 ograms for Sustainable La Posterior Individual Limited 8,036.00 0.00 Cancelado 1 05 26 02 29 nimiento y recuperación y ndscape Management de lso procedimientos de li cenciamiento de proyectos viales CO-PNF-41758-CS-INDV / C ontrol de calidad de la inter pretación de coberturas de la tierra, de las áreas priori Component 3 - Sectoral Pr 2017-12-2 2018-01- 2018-01- 2018-02- 2018-06- zadas por la Mesa Técnica TF / 18478 ograms for Sustainable La Posterior Individual Limited 10,714.00 0.00 Cancelado 9 03 24 28 28 Ambiental para la Formulac ndscape Management ión de Recomendaciones s obre Infraestructura y Activ idades Sectoriales en la Am azonia, de acuerdo con los protocolos CO-PNF-62962-CS-INDV / E structurar un Manual Opera tivo que establezca la gobe Component 1 - Protected rnanza, procesos y procedi 2018-10-0 2018-10- 2018-10- 2018-11- 2019-02- TF / 18478 Areas Management and Fi Posterior Individual Limited 21,429.00 0.00 Cancelado mientos de HECO, con base 1 06 20 10 08 nancial Sustainability en las condiciones de dese mbolso, metas e indicadore s de desempeño acordados entre los actores de HECO. CO-PNF-75459-CS-CDS / Pr ofesional para la generació Component 2 - Forest Gov Selección direct 2018-09-2 2018-09- 2018-11- 2018-09- 2019-01- 2020-01- n de la versión 1.0 del map TF / 18478 ernance, Management and Posterior a de consultore Direct 7,500.00 6,785.10 Finalizado 0 30 01 24 31 12 a actualizado de cobertura Monitoring s s de la tierra a escala 1:10 00.000 - IDEAM - JAVIER ES PEJO CO-PNF-75469-CS-INDV / P restar los servicios profesio Component 2 - Forest Gov 2018-09-2 2018-10- 2018-09- 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- 2019-03- nales para realizar la actual TF / 18478 ernance, Management and Posterior Individual Limited 4,821.00 3,890.57 Finalizado 0 18 25 30 10 15 01 28 31 24 ización de coberturas de la Monitoring tierra a escala 1:100.000 p ara la región de la Amazoni a, CO-PNF-75474-CS-INDV / I ntérprete para el análisis m ultitemporal de accesos ter restres, asentamientos, pis Component 2 - Forest Gov 2018-09-2 2019-03- 2018-09- 2019-03- 2018-10- 2019-04- 2018-11- 2019-05- 2019-02- 2019-12- tas y aeropuertos en áreas TF / 18478 ernance, Management and Posterior Individual Limited 6,429.00 7,461.27 Finalizado 0 11 25 13 10 22 01 02 28 11 seleccionadas complement Monitoring arias de los departamentos de Caquetá, Sur del Meta, Guaviare, Putumayo, Amaz onas, Vaupés y Guainía IDE AM CO-PNF-75479-CS-INDV / D iseñar y diagramar los cont Component 4 - Project Coo enidos visuales y las piezas rdination, Management, M 2018-09-2 2018-09- 2018-10- 2018-11- 2018-10- 2019-10- 2019-10- de comunicación y divulgac TF / 18478 Posterior Individual Limited 17,143.00 15,241.92 Finalizado onitoring and Evaluation ( 0 25 12 01 26 31 24 ión que se requieran para p M&E) resentar los informes y res ultados que se generen en la implementación del Proy ecto. CO-PNF-81059-CS-INDV / F ormular un plan de acción para la implementación del Component 2 - Forest Gov Sistema de Información de 2018-10-2 2019-05- 2018-10- 2018-12- 2018-11- 2019-01- 2018-12- 2019-02- 2019-01- 2019-03- TF / 18478 ernance, Management and Posterior Individual Limited 3,571.00 2,907.20 Finalizado Seguimiento Ambiental SIS 5 20 30 20 14 25 03 02 03 24 Monitoring A en CDA, con base en el di agnóstico de la infraestruct ura tecnológica y de los pro cedimientos de gestión de l a información de la entidad CO-PNF-81061-CS-INDV / L ineamientos de política púb Component 2 - Forest Gov lica ambiental para la actu 2018-10-2 2018-10- 2018-11- 2018-12- 2018-11- 2019-03- 2019-02- TF / 18478 ernance, Management and Posterior Individual Limited 9,643.00 9,947.39 Finalizado alización de los instrument 5 30 13 05 23 05 22 Monitoring os de ordenamiento territor ial, en cumplimiento en cu mplimiento de la sentencia 4360 de 2018. CO-PNF-81066-CS-INDV / E Component 2 - Forest Gov laboración de guión, toma 2018-10-2 2018-10- 2018-10- 2018-11- 2018-11- 2019-01- 2018-12- 2019-03- 2019-01- 2019-04- TF / 18478 ernance, Management and Posterior Individual Limited 2,857.00 2,300.80 Finalizado de imágenes y edición un v 5 04 30 15 15 18 13 18 14 15 Monitoring ideo sobre gestión de cono cimiento de los bosques CO-PNF-81062-CS-INDV / C onsolidación y actualizació n del PBOT de San José del Component 2 - Forest Gov 2018-11-1 2018-12- 2018-11- 2018-04- 2018-12- 2018-12- 2018-12- 2018-12- 2019-07- 2019-07- Guaviare, de conformidad c TF / 18478 ernance, Management and Posterior Individual Direct 8,750.00 7,130.73 Finalizado 4 03 24 16 05 12 24 31 22 15 on los lineamiento definido Monitoring s por el MADS para el cump limiento de la STC 4360 de 2018. Deyanira Vanegas CO-PNF-81064-CS-INDV / S istematización de la imple Component 2 - Forest Gov 2018-11-1 2019-04- 2018-11- 2019-04- 2018-12- 2019-04- 2018-12- 2019-05- 2019-02- 2019-11- mentación y los resultados TF / 18478 ernance, Management and Posterior Individual Direct 3,786.00 6,218.06 Finalizado 3 05 23 08 04 24 24 09 24 30 de los Planes de Pueblos In Monitoring dígenas- KATTERINE BETAN COURT GARCÍA CO-PNF-85473-CS-INDV / R evisión y conceptualización de los planes de ordenamie Component 2 - Forest Gov 2018-11-2 2018-09- 2018-11- 2019-03- 2018-12- 2019-04- 2019-01- 2019-04- 2019-06- 2020-04- nto territorial (Departamen TF / 18478 ernance, Management and Posterior Individual Limited 16,071.00 16,509.36 Finalizado 2 11 27 12 18 17 22 23 21 05 tal y municipales), en la et Monitoring apa de concertación entre l a CDA, alcaldias y goberna ción del Guavaire. CO-PNF-89582-CS-INDV / C Component 4 - Project Coo oordinación general del pro rdination, Management, M 2018-12-1 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2019-01- 2019-12- 2019-06- TF / 18478 Posterior Individual Direct 61,329.00 50,693.46 Finalizado yecto- 2019. Doris Ochoa J onitoring and Evaluation ( 4 04 24 07 27 31 02 08 31 02 aramillo - Miembro UCP M&E) CO-PNF-89585-CS-INDV / P Component 4 - Project Coo rofesional de seguimiento y rdination, Management, M 2018-12-1 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2019-01- 2019-12- 2019-07- TF / 18478 Posterior Individual Direct 44,209.00 36,318.29 Finalizado monitoreo- 2019. Luz Adria onitoring and Evaluation ( 4 04 24 04 27 31 02 08 31 04 na Rodriguez Porras - Miem M&E) bro UCP CO-PNF-89586-CS-INDV / E Component 4 - Project Coo 2018-12-1 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2019-01- 2019-12- 2020-01- specialista financiera- 2019 TF / 18478 rdination, Management, M Posterior Individual Direct 33,958.00 29,709.75 Finalizado 4 04 24 09 27 31 02 08 31 08 . Doris Fajardo Rodriguez - onitoring and Evaluation ( Miembro UCP M&E) CO-PNF-89587-CS-INDV / E Component 4 - Project Coo 2018-12-1 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2019-01- 2019-12- 2019-04- specialista de Adquisicione TF / 18478 rdination, Management, M Posterior Individual Direct 45,429.00 36,979.58 Finalizado 4 04 24 09 27 31 02 08 31 16 s - 2019. Fredy Mojica - Mie onitoring and Evaluation ( mbro UCP M&E) CO-PNF-89588-CS-INDV / C onsultoría jurídica y gestión interinstitucional de apoyo Component 3 - Sectoral Pr a los procesos que requiera 2018-12-1 2018-10- 2018-12- 2018-10- 2018-12- 2019-01- 2019-01- 2019-02- 2019-07- 2020-03- TF / 18478 ograms for Sustainable La Posterior Individual Direct 22,714.00 37,183.53 Finalizado n las entidades SINA en el 4 04 24 05 27 28 02 16 01 15 ndscape Management cumplimiento de la Senten cia y concreción de acuerd os sectoriales. Eugenia Pon ce de León - Miembro UCP CO-PNF-89589-CS-INDV / P Component 3 - Sectoral Pr rofesional de Enlace DTAM 2018-12-1 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2019-01- 2019-12- 2020-01- TF / A5789 ograms for Sustainable La Posterior Individual Direct 36,429.00 29,659.56 Finalizado - 5 áreas protegidas. Maria 4 04 24 11 27 31 02 21 31 18 ndscape Management Cristina Pacheco - Miembro UCP CO-PNF-89590-CS-INDV / P rofesional de apoyo para l Component 3 - Sectoral Pr 2018-12-1 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2019-01- 2019-12- 2020-01- a implementación de acuer TF / A5789 ograms for Sustainable La Posterior Individual Direct 34,998.00 28,933.76 Finalizado 4 04 24 13 27 31 02 19 31 18 dos con el sector de infraes ndscape Management tructura vial. Camilo Rodríg uez Pava - Miembro UCP CO-PNF-89591-CS-INDV / P rofesional que coordine y o riente la implementación d Component 3 - Sectoral Pr 2018-12-1 2018-11- 2018-12- 2018-11- 2018-12- 2018-12- 2019-01- 2019-01- 2019-12- 2020-01- e los acuerdos de conserva TF / 18478 ograms for Sustainable La Posterior Individual Direct 23,571.00 18,981.60 Finalizado 4 30 24 30 27 31 02 21 31 19 ción, restauración y no def ndscape Management orestación en las áreas de i ntervención priorizadas por la CDA. Gina Fernanda Ver a - Miembro UCP CO-PNF-89592-CS-INDV / P rofesional Especializado Ár Component 1 - Protected 2018-12-1 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2019-01- 2019-12- 2020-01- eas Protegidas de enlace C TF / A5789 Areas Management and Fi Posterior Individual Direct 24,304.00 20,103.24 Finalizado 4 04 24 05 27 31 02 19 31 19 DA - Mesa Interinstitucional nancial Sustainability - Comunidades Guaviare. Arelis Arciniegas. CO-PNF-89593-CS-INDV / P rofesional para el acompañ amiento a los resguardos in Component 3 - Sectoral Pr 2018-12-1 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2019-01- 2019-06- 2019-06- dígenas en el manejo y sist TF / A5789 ograms for Sustainable La Posterior Individual Direct 9,464.00 7,823.07 Finalizado 4 19 24 20 27 31 02 19 01 15 ematización de las iniciativ ndscape Management as de Chagras que desarrol len los grupos de mujeres. Katterine Betancourt. CO-PNF-89594-CS-INDV / P Component 2 - Forest Gov rofesional apoyo plan de m 2018-12-1 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2019-01- 2019-04- 2019-07- TF / 18478 ernance, Management and Posterior Individual Direct 4,543.00 7,070.93 Finalizado anejo resguardos del medi 4 19 24 19 27 31 02 19 01 15 Monitoring o Caquetá. Erick López Van egas CO-PNF-89595-CS-INDV / L íder junior en procesamient Component 2 - Forest Gov 2018-12-1 2018-11- 2018-12- 2018-11- 2018-12- 2018-12- 2019-01- 2019-01- 2019-12- 2020-01- o digital para capacitación TF / 18478 ernance, Management and Posterior Individual Direct 28,114.00 23,097.24 Finalizado 4 19 24 21 27 31 02 19 31 18 y transferencia del SMBYC Monitoring a autoridades ambientales - 2019. Juan Carlos Rubiano . CO-PNF-89596-CS-INDV / P rofesional especializado en sistema de información geo Component 2 - Forest Gov 2018-12-1 2017-12- 2018-12- 2017-12- 2018-12- 2018-01- 2019-01- 2018-01- 2019-12- 2019-01- gráfica, sensores remotos / TF / 18478 ernance, Management and Posterior Individual Direct 45,171.00 34,664.44 Finalizado 4 07 24 12 27 02 02 21 31 07 monitoreo de recursos natu Monitoring rales que lidera el procesa miento digital de imágenes - 2019. Gustavo Galindo CO-PNF-89597-CS-INDV / E Component 2 - Forest Gov xperto en Monitoreo, Repor 2018-12-1 2018-11- 2018-12- 2018-11- 2018-12- 2018-12- 2019-01- 2019-01- 2019-12- 2020-01- TF / 18478 ernance, Management and Posterior Individual Direct 39,000.00 32,040.37 Finalizado te y Verificación - MVR -201 4 19 24 20 27 31 02 19 31 19 Monitoring 9. José Julian González CO-PNF-89598-CS-INDV / P rofesional especializado en Component 2 - Forest Gov SIG, sensores remotos, y m 2018-12-1 2018-11- 2018-12- 2018-12- 2019-01- 2019-01- 2019-12- 2020-01- TF / 18478 ernance, Management and Posterior Individual Direct 33,986.00 30,806.15 Finalizado onitoreo de recursos natur 4 19 24 27 02 19 31 19 Monitoring ales encargados en control Temático de Calidad - SYM BC- 2019. Katherine Vergar a CO-PNF-89599-CS-INDV / P rofesional en Manejo de Sis Component 2 - Forest Gov 2018-12-1 2018-11- 2018-12- 2018-12- 2019-01- 2019-01- 2019-12- 2020-01- temas de Información que TF / 18478 ernance, Management and Posterior Individual Direct 23,829.00 21,599.27 Finalizado 4 19 24 27 02 19 31 19 Genere las Alertas Tempra Monitoring nas de Deforestación - PDI 1 - 2019. Cristian Forero. CO-PNF-89600-CS-INDV / P rofesional en Manejo de Sis Component 2 - Forest Gov 2018-12-1 2018-11- 2018-12- 2018-12- 2019-01- 2019-01- 2019-12- 2020-01- temas de Información que TF / 18478 ernance, Management and Posterior Individual Direct 23,829.00 21,599.27 Finalizado 4 19 24 27 02 19 31 19 Genere las Alertas Tempra Monitoring nas de Deforestación - PDI 2 - 2019. Diana Lara. CO-PNF-89777-CS-INDV / P Component 4 - Project Coo 2018-12-1 2018-12- 2019-01- 2019-01- 2020-01- rofesional apoyo adquisicio TF / 18478 rdination, Management, M Posterior Individual Limited 21,429.00 0.00 Cancelado 4 19 08 16 15 nes onitoring and Evaluation ( M&E) Page 7 CO-PNF-89782-CS-INDV / P rofesional apoyo a la gestió Component 3 - Sectoral Pr 2018-12-2 2019-02- 2018-12- 2019-03- 2019-01- 2019-03- 2019-02- 2019-04- 2020-01- 2020-01- n territorial y de seguimien TF / 18478 ograms for Sustainable La Posterior Individual Limited 21,429.00 20,931.84 Finalizado 0 20 25 05 08 22 04 06 31 13 to a la planeación y ejecuci ndscape Management ón operativa regional (Caq uetá). CO-PNF-89786-CS-INDV / P rofesional que generé infor Component 3 - Sectoral Pr 2018-12-2 2019-03- 2018-12- 2019-03- 2019-01- 2019-03- 2019-02- 2019-04- 2020-01- 2020-08- mación espacial para la im TF / A5789 ograms for Sustainable La Posterior Individual Limited 17,143.00 13,954.56 Finalizado 0 08 25 11 09 29 04 13 31 04 plementación de los acuerd ndscape Management os de conservación, restaur ación y no deforestación - CAZ CO-PNF-89788-CS-INDV / P rofesional para coordinar y facilitar la implementación Component 3 - Sectoral Pr 2018-12-2 2018-12- 2018-12- 2018-12- 2019-01- 2019-02- 2019-02- 2019-03- 2020-01- 2020-04- de los planes de trabajo de TF / A5789 ograms for Sustainable La Posterior Individual Limited 27,636.00 25,245.44 Finalizado 0 04 25 04 09 11 04 04 31 21 finidos con los resguardos I ndscape Management ndígenas vecinos del PNNS CH y los que suscribieron lo s acuerdos de voluntades c on el PNN La Paya. CO-PNF-89790-CS-INDV / P Component 1 - Protected rofesional para realizar el e 2018-12-2 2019-03- 2018-12- 2019-03- 2019-01- 2019-04- 2019-02- 2019-05- 2020-01- 2019-07- TF / A5789 Areas Management and Fi Posterior Individual Limited 15,714.00 12,654.40 Finalizado nlace técnico para la gestió 0 05 25 21 09 17 04 02 02 10 nancial Sustainability n comunitaria del APR Bajo Caguán CO-PNF-89793-CS-INDV / P Component 1 - Protected rofesional Apoyo proceso f 2018-12-2 2018-07- 2018-12- 2018-09- 2019-01- 2019-03- 2019-02- 2018-10- 2020-01- 2019-04- TF / A5789 Areas Management and Fi Posterior Individual Limited 21,429.00 17,604.60 Finalizado ormulación de plan de man 0 19 25 12 10 22 04 27 31 02 nancial Sustainability ejo de la nueva APR Páram o de Miraflores - Picachos CO-PNF-99123-CS-INDV / C oordinar el proceso de ases oría técnica a municipios, g Component 3 - Sectoral Pr obernaciones, CDS y organi 2019-02-1 2019-01- 2019-02- 2019-02- 2019-03- 2019-03- 2019-03- 2019-03- 2020-01- 2020-04- TF / 18478 ograms for Sustainable La Posterior Individual Limited 25,807.00 27,172.48 Finalizado zaciones de apoyo, para lle 8 31 23 22 07 18 20 24 15 25 ndscape Management var a término el ajuste exc epcional de los POT, de con formidad con lo ordenado e n la Sentencia STC 4360-20 18. CO-PNF-99124-CS-INDV / D iseñar e implementar la est rategia de coordinación y c Component 3 - Sectoral Pr oncertación con las autorid 2019-02-1 2019-01- 2019-02- 2019-02- 2019-03- 2019-03- 2019-03- 2019-03- 2020-01- 2020-04- TF / 18478 ograms for Sustainable La Posterior Individual Direct 25,807.00 27,547.68 Finalizado ades territoriales, sectorial 8 31 28 06 12 12 20 19 20 01 ndscape Management es y ambientales, para el aj uste excepcional de los PO T de 15 municipios de la A mazonia colombiana. César Augusto Rey Angel CO-PNF-99126-CS-INDV / P rofesional Especializado qu e Lidere el proceso de com Component 4 - Project Coo unicación y gestión del con rdination, Management, M 2019-02-1 2019-01- 2019-02- 2019-02- 2019-03- 2019-02- 2019-03- 2019-03- 2020-03- 2020-04- TF / 18478 Posterior Individual Direct 34,839.00 31,904.28 Finalizado ocimiento de la Iniciativa G onitoring and Evaluation ( 8 25 28 06 12 27 18 07 17 06 EF Corazón de la Amazonia M&E) , entre las entidades socias y actores interesados a niv el nacional y regional . Marcela Rodríguez Salguer oCO-PNF-99128-CS-INDV / D iseñar y desarrollar los cont Component 4 - Project Coo enidos gráficos multiformat rdination, Management, M 2019-02-1 2019-01- 2019-02- 2019-02- 2019-03- 2019-02- 2019-03- 2019-03- 2020-03- 2020-03- o requeridos para la imple TF / 18478 Posterior Individual Direct 30,968.00 28,167.36 Finalizado onitoring and Evaluation ( 8 25 28 12 12 27 21 07 20 06 mentación de la Estrategia M&E) de comunicaciones y gestió n del conocimiento de la Ini ciativa.. Andrés Urquina Sánchez CO-PNF-99135-CS-INDV / P restar sus servicios profesi onales para apoyar la ejecu Component 4 - Project Coo ción de los procesos de adq rdination, Management, M 2019-02-1 2019-01- 2019-02- 2019-03- 2019-02- 2019-03- 2019-02- 2020-02- 2019-07- uisiciones y contrataciones TF / 18478 Posterior Individual Direct 23,226.00 22,889.52 Finalizado onitoring and Evaluation ( 5 21 21 01 12 01 22 29 05 que se requieran de acuerd M&E) o con lo establecido en el A cuerdo Legal de Donación, el Manual Operativo del Pro yecto, el Plan de Adquisicio nes y las CO-PNF-99138-CS-INDV / F ormular recomendaciones r especto de las acciones pri oritarias para la prevención Component 3 - Sectoral Pr 2019-02-1 2019-01- 2019-02- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-06- 2020-01- y la mitigación de impactos TF / 18478 ograms for Sustainable La Posterior Individual Limited 10,000.00 12,744.34 Finalizado 5 24 20 01 05 18 15 25 30 07 de los proyectos de infraes ndscape Management tructura de transporte (vial y fluvial), con base en la pa rametrización de modelos de deforestación en áreas s eleccion CO-PNF-103416-CS-INDV / Gestionar información y ap ortar criterios y documento Component 3 - Sectoral Pr s técnicos para la incorpora 2019-03-1 2019-03- 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- 2019-04- 2019-10- 2019-12- TF / 18478 ograms for Sustainable La Posterior Individual Limited 11,613.00 10,465.92 Finalizado ción del manejo forestal so 5 21 20 21 03 22 10 28 07 25 ndscape Management stenible y la ordenación fo restal de las Corporaciones en los POT de los 15 munici pios citados por la Corte en la Sentencia STC 4360. CO-PNF-103421-CS-INDV / Generar y procesar informa ción para análisis asociado Component 3 - Sectoral Pr 2019-03-1 2019-03- 2019-03- 2019-03- 2019-04- 2019-04- 2019-05- 2019-04- 2019-10- 2019-07- s a la variabilidad y adapta TF / 18478 ograms for Sustainable La Posterior Individual Limited 13,548.00 12,184.62 Finalizado 5 21 20 22 03 22 01 28 28 22 ción al cambio climático pa ndscape Management ra los 15 municipios citado s de manera expresa por la Corte en la Sentencia STC 4360. CO-PNF-103492-CS-INDV / Gestionar información y ap ortar criterios y documento s técnicos asociados a la co Component 3 - Sectoral Pr 2019-03-1 2019-04- 2019-03- 2019-04- 2019-04- 2019-05- 2019-04- 2019-05- 2019-08- 2020-04- nsolidacion y manejo de la TF / 18478 ograms for Sustainable La Posterior Individual Limited 11,613.00 13,605.84 Finalizado 5 15 20 15 03 08 15 15 14 28 estructura ecológica princi ndscape Management pal, manejo adecuado del s uelo, restauración y uso de la biodiversidad, para incor porarlos en los POT de los 15 municipi CO-PNF-103503-CS-INDV / Profesional que generé info Component 3 - Sectoral Pr 2019-04-0 2019-07- 2019-04- 2019-07- 2019-04- 2019-07- 2019-05- 2019-08- 2020-01- 2020-07- rmación espacial para la im TF / A5789 ograms for Sustainable La Posterior Individual Limited 13,065.00 11,561.20 Finalizado 1 11 06 11 19 29 03 13 31 08 plementación de los acuerd ndscape Management os de conservación, restaur ación y no deforestación CO-PNF-113781-CS-INDV / Profesional que oriente téc nicamente los procesos de coordinación institucional y Component 3 - Sectoral Pr 2019-05-1 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2020-06- 2020-07- concertación social necesar TF / A5789 ograms for Sustainable La Posterior Individual Limited 27,097.00 24,369.24 Finalizado 3 31 21 31 31 14 07 29 06 15 ios para el establecimiento ndscape Management y mantenimiento de los ac uerdos de conservación, re stauración y no deforestaci ón, en las áreas definidas p or CORPOAMAZ CO-PNF-118099-CS-CDS / Profesional de apoyo CORP Component 3 - Sectoral Pr Selección direct 2019-06-1 2019-06- 2019-06- 2019-06- 2019-07- 2019-08- 2020-01- 2020-02- OAMAZONIA para la incorp TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 9,232.00 8,322.12 Finalizado 0 21 20 28 23 05 19 09 oración de criterios ambien ndscape Management s tales para proyectos de red vial terciarias- Jairo Cárden as CO-PNF-118100-CS-CDS / Profesional de apoyo CDA Component 3 - Sectoral Pr Selección direct 2019-06-1 2019-06- 2019-06- 2019-06- 2019-07- 2019-08- 2020-01- 2020-02- para la incorporación de cri TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 9,232.00 8,272.04 Finalizado 0 21 20 28 19 01 15 09 terios ambientales para pro ndscape Management s yectos de red vial terciarias . - Enrique Caballero CO-PNF-118102-CS-CDS / Component 4 - Project Coo Selección direct 2019-06-0 2019-06- 2019-06- 2019-06- 2019-07- 2019-07- 2020-07- 2020-01- Coordinación General del p TF / A5789 rdination, Management, M Posterior a de consultore Direct 54,194.00 21,330.41 Finalizado 7 17 17 20 17 17 15 28 royecto - Luz Adriana Rodrí onitoring and Evaluation ( s guez M&E) CO-PNF-118103-CS-CDS / Component 4 - Project Coo Selección direct 2019-06-0 2019-06- 2019-06- 2019-06- 2019-07- 2019-07- 2020-07- 2020-07- Especialista de adquisicion TF / A5789 rdination, Management, M Posterior a de consultore Direct 34,839.00 31,215.24 Finalizado 7 21 17 27 17 17 15 23 es- Viviana Sánchez Quinte onitoring and Evaluation ( s ro M&E) CO-PNF-118104-CS-INDV / Orientar los procesos de pl Component 3 - Sectoral Pr anificación, ordenamiento 2019-06-1 2019-10- 2019-06- 2019-10- 2019-07- 2019-10- 2019-07- 2019-11- 2020-07- 2020-12- TF / A5789 ograms for Sustainable La Posterior Individual Limited 17,419.00 11,817.90 Finalizado y gestión de turismo de nat 4 03 19 11 03 30 19 17 17 15 ndscape Management uraleza en las áreas selecci onadas de la jurisdicción d e la CDA, Guaviare CO-PNF-118105-CS-INDV / Component 4 - Project Coo 2019-06-1 2019-09- 2019-06- 2019-09- 2019-07- 2019-10- 2019-07- 2019-11- 2020-07- 2020-12- Profesional de seguimiento, TF / A5789 rdination, Management, M Posterior Individual Limited 38,710.00 32,408.64 Finalizado 4 16 19 18 03 30 19 17 17 15 monitoreo y evaluación del onitoring and Evaluation ( proyecto M&E) CO-PNF-113782-CS-CDS / AUDITORIA EXTERNA DEL P Component 4 - Project Coo ROYECTO "CONSERVACIÓN Selección direct rdination, Management, M 2019-06-0 2019-04- 2019-07- 2019-08- 2019-08- 2019-09- 2020-02- 2019-12- DE BOSQUES Y SOSTENIBIL TF / A5789 Posterior a de consultore Direct 28,525.00 13,016.08 Finalizado onitoring and Evaluation ( 3 03 24 02 08 06 04 22 IDAD EN EL CORAZÓN DE L s M&E) A AMAZONIA" BAJO EL (P14 4271- TF018478) Y FINANCI ACIÓN ADICIONAL (P15800 3-TF0A5789) CO-PNF-123107-CS-INDV / Realizar la sustentación téc nica y apoyo del proceso d Component 1 - Protected e construcción y validación 2019-07-2 2019-07- 2019-07- 2019-07- 2019-08- 2019-07- 2019-08- 2019-09- 2019-12- 2019-12- TF / A5789 Areas Management and Fi Posterior Individual Limited 7,742.00 4,682.29 Finalizado social e institucional para l 6 29 31 30 14 29 28 08 27 30 nancial Sustainability a declaratoria de la nueva área protegida regional en el de departamento del Gu aviare en Jurisdicción de la CDA. CO-PNF-123080-CS-CDS / Coordinar la revisión y ajus te del esquema de ordena miento del municipio de Mi Component 3 - Sectoral Pr Selección direct 2019-07-2 2019-07- 2019-08- 2019-08- 2019-08- 2019-09- 2019-11- 2020-01- raflores en todos sus comp TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 6,774.00 6,503.18 Finalizado 6 18 05 08 26 24 22 19 onentes conforme con los li ndscape Management s neamientos nacionales (MA DS), departamentales y det erminantes ambientales de la CDA para el cumplimient o de la STC 4360/2018 CO-PNF-123079-CS-CDS / Profesional que sistematice Component 4 - Project Coo la experiencia y documente Selección direct rdination, Management, M 2019-07-2 2019-08- 2019-08- 2019-08- 2019-08- 2019-09- 2020-08- 2020-09- la implementación del proy TF / A5789 Posterior a de consultore Direct 21,290.00 19,075.98 Finalizado onitoring and Evaluation ( 6 05 05 12 26 13 25 12 ecto GEF Corazón de la Am s M&E) azonia y realice seguimient o a la aplicación de los inst rumentos de salvaguardas sociales. CO-PNF-130031-CS-INDV / Actualizar el componente a Component 3 - Sectoral Pr mbiental del PDS de la ZRC 2019-09-2 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2020-04- 2021-01- TF / A5789 ograms for Sustainable La Posterior Individual Limited 7,742.00 10,350.72 Finalizado cuenca del río Pato y valle 0 15 27 15 11 18 25 24 22 06 ndscape Management de Balsillas, y actualización del estudio de sustracción del Bajo Pato. CO-PNF-130033-CS-INDV / Generar la base cartográfic a para la a actualización de l Plan de Desarrollo Sosteni Component 3 - Sectoral Pr 2019-09-2 2019-10- 2019-09- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2020-04- 2021-01- ble (PDS) de la zona de Res TF / A5789 ograms for Sustainable La Posterior Individual Limited 7,742.00 10,045.20 Finalizado 0 15 27 29 11 15 25 05 22 06 erva Campesina (ZRC) cue ndscape Management nca del Río Pato y Valle de Balsillas, precisión de límit es y ampliación de la zona del bajo Pato y el estudio p ara sustr CO-PNF-130035-CS-INDV / Actualizar el componente s Component 3 - Sectoral Pr ocioeconómico del PDS de l 2019-09-2 2019-09- 2019-09- 2019-09- 2019-10- 2019-11- 2019-10- 2019-11- 2020-02- 2021-07- TF / A5789 ograms for Sustainable La Posterior Individual Limited 5,161.00 4,555.04 Finalizado a ZRC de la cuenca del río 0 19 27 20 11 08 25 28 21 12 ndscape Management Pato y Valle de Balsillas, y actualización del estudio d e sustracción del Bajo Pato. CO-PNF-130038-CS-CDS / Elaborar la cartilla marco d e referencia para la toma d e decisiones para la imple Component 3 - Sectoral Pr Selección direct 2019-09-2 2019-08- 2019-09- 2019-09- 2019-10- 2020-01- 2020-01- 2020-07- mentación de pasos de fau TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 7,258.00 6,644.03 Finalizado 0 28 30 26 21 25 17 30 na en proyectos de infraest ndscape Management s ructura carretera existente s o proyectados en la regió n amazónica y proveer crit erios económicos para la in corporación de CO-PNF-123077-CS-CDS / Apoyar técnicamente la co ncertación y formalización de acuerdos en Áreas y te Component 3 - Sectoral Pr Selección direct 2019-09-2 2019-09- 2019-09- 2019-09- 2019-10- 2019-11- 2020-04- 2020-06- mas de Interés común con TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 11,613.00 10,663.20 Finalizado 0 12 30 18 21 01 20 07 los resguardos colindantes ndscape Management s al Parque Nacional Serranía de Chiribiquete que contrib uyan al mejoramiento de la gobernanza ambiental del t erritorio. CO-PNF-130041-CS-INDV / Apoyar técnicamente a las autoridades indígenas de lo s resguardos de Andoque d Component 3 - Sectoral Pr 2019-09-2 2019-10- 2019-09- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2020-02- 2020-04- e Aduche, Miriti-Paraná, Mo TF / A5789 ograms for Sustainable La Posterior Individual Limited 6,452.00 5,805.60 Finalizado 0 03 27 29 11 15 25 05 21 12 nochoa ,Puerto Zábalo los ndscape Management Monos y Nonuya de Villazul en el proceso de incorporac ión de las áreas de interés común, en los planes cultur ales de manejo CO-PNF-130032-CS-INDV / Realizar propuesta de orde namiento productivo y actu Component 3 - Sectoral Pr 2019-09-2 2019-09- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2020-04- 2021-01- alización del componente p TF / A5789 ograms for Sustainable La Posterior Individual Limited 7,742.00 10,062.48 Finalizado 0 19 27 01 11 25 25 11 22 07 roductivo del PDS de la ZR ndscape Management C cuenca del río Pato y vall e de Balsillas, y actualizaci ón del estudio de sustracci ón del Bajo Pato. CO-PNF-130030-CS-INDV / Coordinar el proceso de act ualización del Plan de Desa Component 3 - Sectoral Pr rrollo Sostenible de la Zona 2019-09-2 2019-09- 2019-09- 2019-09- 2019-10- 2019-10- 2019-10- 2019-11- 2020-05- 2021-01- TF / A5789 ograms for Sustainable La Posterior Individual Limited 11,290.00 14,638.85 Finalizado de Reserva Campesina cue 0 20 27 20 11 30 25 14 25 06 ndscape Management nca del río Pato y Valle de Balsillas, la precisión de lím ites, y actualización del est udio de sustracción del Baj o Pato. CO-PNF-134080-CS-CDS / Prestar sus servicios profes ionales para apoyar la ejec Component 4 - Project Coo ución de los procesos de ad Selección direct rdination, Management, M 2019-09-2 2019-09- 2019-09- 2019-09- 2019-10- 2019-10- 2020-10- 2020-10- quisiciones y contratacione TF / A5789 Posterior a de consultore Direct 20,516.00 18,804.61 Finalizado onitoring and Evaluation ( 0 11 30 11 23 11 22 23 s que se requieran de acue s M&E) rdo con lo establecido en el Acuerdo Legal de Donación , el Manual Operativo del Pr oyecto, el Plan de Adquisici ones y las CO-PNF-81085-CS-INDV / P lanificación, ordenamiento Component 3 - Sectoral Pr 2019-06-1 2019-06- 2019-07- 2019-07- 2020-06- y gestión del turismo de na TF / A5789 ograms for Sustainable La Posterior Individual Limited 17,679.00 0.00 Cancelado 4 19 05 26 19 turaleza, en áreas seleccio ndscape Management nadas de la jurisdicción de CDA. CO-PNF-99131-CS-INDV / E xperto que facilite los talle Component 3 - Sectoral Pr res que se definan con ATI 2019-02-1 2019-02- 2019-03- 2019-03- 2020-01- TF / A5789 ograms for Sustainable La Posterior Individual Limited 5,806.00 0.00 Cancelado COYA, en aspectos legales 8 23 08 20 15 ndscape Management y normativos, aprovechami ento de recursos naturales y otros temas CO-PNF-99129-CS-INDV / E xperto que facilite los taller Component 3 - Sectoral Pr es que se definan con la M 2019-02-1 2019-02- 2019-03- 2019-03- 2020-01- TF / A5789 ograms for Sustainable La Posterior Individual Limited 3,629.00 0.00 Cancelado esa Ramsar EFI en aspecto 8 23 08 20 17 ndscape Management s legales y normativos, apr ovechamiento de recursos naturales y otros temas CO-PNF-96464-CS-INDV / P rofesional que realice los e Component 1 - Protected studios técnicos para la de 2019-02-1 2019-02- 2019-03- 2019-03- 2019-09- TF / A5789 Areas Management and Fi Posterior Individual Limited 9,677.00 0.00 Cancelado claración de reservas natur 5 20 01 08 04 nancial Sustainability ales de la sociedad civil en el área de amortiguamient o del APR Páramo de Mirafo res Picachos CO-PNF-109350-CS-INDV / Component 3 - Sectoral Pr Diseño participativo de una 2019-04-2 2019-05- 2019-05- 2019-06- 2019-09- TF / 18478 ograms for Sustainable La Posterior Individual Open 4,839.00 0.00 Cancelado estrategia de comunicacion 5 14 28 14 11 ndscape Management es para ASOCAPRICHO CO-PNF-109352-CS-INDV / Component 4 - Project Coo 2019-04-2 2019-05- 2019-06- 2019-07- 2020-03- Especialista de Adquisicion TF / 18478 rdination, Management, M Posterior Individual Open 27,355.00 0.00 Cancelado 5 29 19 10 03 es - 2019 onitoring and Evaluation ( M&E) CO-PNF-96466-CS-INDV / P rofesional que incorporé los lineamientos de OT del MA DS, la CDA y Gobernación Component 3 - Sectoral Pr 2019-01-2 2019-02- 2019-02- 2019-03- 2019-06- del Guaviare, en los OT mu TF / 18478 ograms for Sustainable La Posterior Individual Limited 13,548.00 0.00 Cancelado 9 03 18 01 30 nicipales de Retorno, Cala ndscape Management mar, Miraflores y Depto del Guaviare y complemente pl anes de acción con accione s de mitigación al cc y cont rol a la defores CO-PNF-96467-CS-INDV / P rofesional que incorporé los ajustes cartográficos en los OT municipales de Retorno, Component 3 - Sectoral Pr 2019-01-2 2019-02- 2019-02- 2019-03- 2019-06- Calamar, Miraflores y Dept TF / 18478 ograms for Sustainable La Posterior Individual Limited 13,548.00 0.00 Cancelado 9 03 18 01 30 o del Guaviare y compleme ndscape Management nte planes de acción con a cciones de mitigación al cc y control a la deforestación , en cumplimiento de la Se ntencia. CO-PNF-118114-CS-CDS / Consolidación y actualizaci ón de los Esquemas de Ord enamiento Territorial de El Component 3 - Sectoral Pr Selección direct 2019-06-1 2019-06- 2019-07- 2019-12- Retorno, Calamar y Miraflor TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 12,097.00 0.00 Cancelado 4 24 24 23 es, de conformidad con los ndscape Management s lineamientos definidos por el MADS para el cumplimie nto de la STC 4360 de 201 8 y coordinar con las Alcald ías de El Retorn CO-PNF-123084-CS-CDS / Coordinar la revisión y ajus te de los esquemas de orde namiento de los municipios Component 3 - Sectoral Pr Selección direct 2019-07-2 2019-08- 2019-08- 2019-11- de El Retorno y Calamar y TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 6,774.00 0.00 Cancelado 6 05 26 25 elaborar el componente ge ndscape Management s neral, conforme con los line amientos nacionales (MAD S), departamentales y dete rminantes ambientales de l a CDA para el cumpl CO-PNF-123086-CS-CDS / Elaborar la revisión y ajust e del componente rural de l os esquemas de ordenamie Component 3 - Sectoral Pr Selección direct 2019-07-2 2019-08- 2019-08- 2019-11- nto de los municipios de El TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 6,290.00 0.00 Cancelado 6 05 26 25 Retorno y Calamar conform ndscape Management s e con los lineamientos naci onales (MADS), departame ntales y determinantes am bientales de la CDA para el cumplimiento de la Page 8 CO-PNF-123087-CS-CDS / Realizar la compilación, ar monización e integración d e todos los documentos qu Component 3 - Sectoral Pr Selección direct 2019-07-2 2019-08- 2019-08- 2019-11- e conforman los esquemas TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 4,839.00 0.00 Cancelado 6 05 26 21 de ordenamiento, EOT (Ge ndscape Management s neral, urbano y rural) de ac uerdo a la norma y redacci ón requerida para los EOTy los requisitos de la CDA. Le idy Bernal Vargas CO-PNF-123088-CS-CDS / Realizar la revisión y ajuste de los documentos del Plan Departamental de Ordena Component 3 - Sectoral Pr Selección direct 2019-07-2 2019-08- 2019-08- 2019-10- miento Territorial - PDOT, a TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 4,516.00 0.00 Cancelado 6 05 26 25 corde a los lineamientos na ndscape Management s cionales (MADS), departam entales y determinantes a mbientales de la CDA para el cumplimiento de la STC 4360/2018 y garan CO-PNF-123091-CS-INDV / Liderar y desarrollar el proc eso de construcción y valid Component 1 - Protected ación social, institucional y 2019-07-2 2019-07- 2019-08- 2019-08- 2020-08- TF / A5789 Areas Management and Fi Posterior Individual Limited 27,097.00 0.00 Cancelado técnica a nivel local y regio 6 31 15 29 28 nancial Sustainability nal para la declaración del APR Bajo Caguán, y oriente las acciones a desarrollar e n el PNR Miraflores Picacho s, Caquetá. CO-PNF-130037-CS-INDV / Apoyar la incorporación de la información espacial rela cionada con la adaptación Component 3 - Sectoral Pr 2019-09-2 2019-09- 2019-10- 2019-10- 2020-02- al cambio climático en las TF / A5789 ograms for Sustainable La Posterior Individual Limited 5,161.00 0.00 Cancelado 0 27 11 25 21 determinantes ambientales ndscape Management de las corporaciones de la r egión Amazonía Colombian a, la cual corresponde a 42 subzonas hidrográficas que abarcan los 15 CO-PNF-134917-CS-INDV / Component 1 - Protected Profesional Apoyo proceso f 2018-12-2 2019-02- 2018-12- 2019-02- 2019-01- 2019-03- 2019-02- 2019-03- 2019-08- 2020-07- TF / A5789 Areas Management and Fi Posterior Individual Limited 21,429.00 17,691.00 Finalizado ormulación de plan de man 0 11 25 21 15 22 19 28 18 02 nancial Sustainability ejo de la nueva APR Páram o de Miraflores - Picachos CO-PNF-137120-CS-INDV / Profesional para consolida Component 3 - Sectoral Pr ción y reporte de informaci 2019-10-2 2019-10- 2019-10- 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-11- 2021-01- TF / A5789 ograms for Sustainable La Posterior Individual Limited 13,548.00 11,970.42 Finalizado ón de sistemas agroforest 1 25 29 18 13 25 29 15 27 06 ndscape Management ales, plantaciones , moviliz ación y aprovechamiento f orestal al SNIF (SIAC)- Corp oamazonia CO-PNF-137125-CS-INDV / Realizar la preproduccion, produccion y pos produccio Component 3 - Sectoral Pr 2019-10-2 2019-10- 2019-10- 2019-11- 2019-11- 2019-11- 2019-12- 2019-12- 2020-02- 2020-04- n de un video en formato H TF / A5789 ograms for Sustainable La Posterior Individual Limited 6,452.00 5,708.00 Finalizado 1 28 28 06 11 25 02 15 03 03 D y registro fotografico pro ndscape Management fesional que de cuenta de l os resultados de GEF CA Fi nanciamiento Original CO-PNF-103505-CS-INDV / Diseño de un Sistema integ Component 1 - Protected 2019-03-1 2019-03- 2019-04- 2019-04- 2019-08- rado de gestión administrat TF / A5789 Areas Management and Fi Posterior Individual Limited 17,419.00 0.00 Cancelado 5 29 03 15 14 iva, financiera y técnica par nancial Sustainability a FPN: levantamiento de re querimientos internos y ext ernos. CO-PNF-71707-CS-INDV / E structurar un Manual Opera tivo que establezca la gobe Component 1 - Protected rnanza, procesos y procedi 2018-08-1 2018-08- 2018-09- 2018-10- 2019-02- TF / 18478 Areas Management and Fi Posterior Individual Limited 21,429.00 0.00 Cancelado mientos de HECO, con base 6 21 11 16 28 nancial Sustainability en las condiciones de dese mbolso, metas e indicadore s de desempeño acordados entre los actores de HECO. CO-PNF-62961-CS-INDV / L iderar la implementación d Component 1 - Protected e la estrategia de comunic 2018-07-1 2018-07- 2018-08- 2018-08- 2019-07- TF / 18478 Areas Management and Fi Posterior Individual Limited 24,643.00 0.00 Cancelado aciones de HERENCIA COL 3 18 01 22 13 nancial Sustainability OMBIA como un factor estr atégico al momento de con solidad esta iniciativa de p aís CO-PNF-78406-CS-INDV / E Component 1 - Protected studios y documentación té 2018-10-1 2018-10- 2018-11- 2018-12- 2019-04- TF / A5789 Areas Management and Fi Posterior Individual Limited 8,571.00 0.00 Cancelado cnica de la nueva Área Prot 5 20 10 06 08 nancial Sustainability egida Regional Bajo Caguá n -CORPOAMAZONIA CO-PNF-41762-CS-INDV / D iseñar una estrategia de co municación lúdico-pedagóg Component 3 - Sectoral Pr ica y desarrollar herramien 2018-07-2 2018-07- 2018-08- 2018-09- 2018-12- TF / 18478 ograms for Sustainable La Posterior Individual Limited 5,357.00 0.00 Cancelado tas audiovisuales y piezas 0 25 15 19 20 ndscape Management comunicativas para la difus ión de los resultados de los análisis de conectividad y f ragmentación de ecosistem as CO-PNF-78421-CS-INDV / C onsultoría en ecoturismo q ue formule la estrategia de Component 3 - Sectoral Pr turismo y realice 3 talleres 2018-10-1 2018-10- 2018-11- 2018-11- 2019-03- TF / A5789 ograms for Sustainable La Posterior Individual Limited 7,143.00 0.00 Cancelado con la comunidad para su c 8 23 07 28 29 ndscape Management oncertación. en el marco d e la línea sistemas producc ión no tradicionales (ecotur ismo) del Plan de Manejo CO-PNF-78407-CS-INDV / E studios y documentación té Component 1 - Protected 2018-10-1 2018-10- 2018-11- 2018-12- 2019-04- cnica de la nueva Área Prot TF / A5789 Areas Management and Fi Posterior Individual Limited 12,143.00 0.00 Cancelado 5 20 10 06 05 egida Regional Páramo de nancial Sustainability Miraflores - Picachos -CORP OAMAZONIA CO-PNF-89794-CS-INDV / C Component 3 - Sectoral Pr ORPOAMAZONIA: Consultor 2018-12-2 2018-12- 2019-01- 2019-02- 2020-01- TF / A5789 ograms for Sustainable La Posterior Individual Limited 42,857.00 0.00 Cancelado Asesoría Montaje del model 0 25 10 04 31 ndscape Management o integrado de desarrollo fo restal. CO-PNF-123093-CS-INDV / Facilitar y gestionar como e nlace técnico y operativo lo Component 1 - Protected cal, los procesos que se ad 2019-07-2 2019-07- 2019-08- 2019-08- 2020-08- TF / A5789 Areas Management and Fi Posterior Individual Limited 15,484.00 0.00 Cancelado elante en la ruta declarator 6 31 15 29 28 nancial Sustainability ia del APR de Bajo Caguán, Caquetá, con las comunida des (productores e indígen as) y actores institucionale s. CO-PNF-144811-CS-INDV / Profesional que coordine el componente Plan de Acción de Control a la Deforestaci Component 3 - Sectoral Pr 2019-11-2 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-02- 2020-09- 2020-11- ón y promoción para la inc TF / A5789 ograms for Sustainable La Posterior Individual Limited 11,613.00 10,541.88 Finalizado 9 15 04 13 09 22 23 05 23 08 orporación de las determin ndscape Management antes ambientales en los P OT en el marco del cumpli miento a la Sentencia Ama zonia No. 4360/2018, en la jurisdicción de Cor CO-PNF-144814-CS-INDV / Profesional que desarrolle de los temas de aprovecha miento forestal, planes de Component 3 - Sectoral Pr 2019-11-2 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-02- 2020-09- 2020-11- manejo y ordenación forest TF / A5789 ograms for Sustainable La Posterior Individual Limited 11,613.00 10,541.88 Finalizado 9 20 04 20 10 22 24 05 21 10 al, para apoyar la impleme ndscape Management ntación de las acciones a c orto plazo en el marco del cumplimiento a la Sentenci a Amazonia No. 4360/2018, en la jurisdicción CO-PNF-89769-CS-INDV / P rofesionales de apoyo al m Component 2 - Forest Gov 2018-12-2 2019-01- 2019-01- 2019-02- 2020-01- onitoreo de efectividad en l TF / A5789 ernance, Management and Posterior Individual Limited 24,544.00 0.00 Cancelado 7 01 09 04 30 a reducción de la deforesta Monitoring ción y análisis de conectivi dad a nivel de paisaje. MDF 1 CO-PNF-89775-CS-INDV / P rofesionales de apoyo al m Component 2 - Forest Gov 2018-12-2 2019-01- 2019-01- 2019-02- 2020-01- onitoreo de efectividad en l TF / A5789 ernance, Management and Posterior Individual Limited 24,544.00 0.00 Cancelado 7 01 03 04 31 a reducción de la deforesta Monitoring ción y análisis de conectivi dad a nivel de paisaje. MDF 2 CO-PNF-89780-CS-INDV / P Component 3 - Sectoral Pr rofesional de seguimiento y 2018-12-2 2019-01- 2019-01- 2019-02- 2020-01- TF / 18478 ograms for Sustainable La Posterior Individual Limited 21,429.00 0.00 Cancelado apoyo a la planeación y eje 7 01 15 04 31 ndscape Management cución operativa regional ( Guaviare) CO-PNF-145712-CS-CDS / Realización análisis de cad enas de valor de Productos Maderables y No Maderabl Component 3 - Sectoral Pr Selección direct 2019-12-1 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-07- 2020-09- es del Bosque identificados TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 19,355.00 17,569.80 Finalizado 3 23 23 30 22 30 20 10 con potencial comercial par ndscape Management s a el programa de Foresterí a Comunitaria de Asocapric ho, con el fin de valorar inv ersiones y acciones estraté gicas por real CO-PNF-96470-CS-INDV / P rofesional de Apoyo gestió Component 3 - Sectoral Pr 2019-01-2 2019-02- 2019-02- 2019-03- 2019-09- n técnica, operativa y com TF / A5789 ograms for Sustainable La Posterior Individual Limited 9,677.00 0.00 Cancelado 9 03 20 08 04 unitaria de actividades de c ndscape Management ontrol y vigilancia de Corpo amazonia en Ramsar Tarap oto. CO-PNF-137123-CS-INDV / Coordinar la formulación d Component 1 - Protected el plan de manejo del PNN 2019-10-2 2019-10- 2019-11- 2019-11- 2020-05- TF / A5789 Areas Management and Fi Posterior Individual Limited 13,161.00 0.00 Cancelado Serrania de Chiribiquete de 1 29 13 29 27 nancial Sustainability manera participativa y de a cuerdo a los lineamientos i nstitucionales de Parques Nacionales CO-PNF-103495-CS-INDV / Apoyar la elaboración de d ocumentos técnicos de las determinantes ambientales Component 3 - Sectoral Pr 2019-03-1 2019-03- 2019-04- 2019-04- 2019-08- asociadas a la reducción a TF / 18478 ograms for Sustainable La Posterior Individual Limited 7,742.00 0.00 Cancelado 5 20 02 15 14 cero deforestación y la ada ndscape Management ptación al cambio climático de las Corporaciones y rea lizar la evaluación de los P OT de los municipios del G uaviare, en cu CO-PNF-63403-CS-INDV / C oordinar, orientar y liderar l Component 3 - Sectoral Pr 2018-07-1 2018-07- 2018-08- 2018-08- 2019-02- a implementación de los ac TF / 18478 ograms for Sustainable La Posterior Individual Limited 17,500.00 0.00 Cancelado 3 18 01 29 25 uerdos de conservación, re ndscape Management stauración y no deforestaci ón - CDA CO-PNF-118107-CS-INDV / Construir y desarrollar una guía de investigación prees Component 3 - Sectoral Pr 2020-02-1 2020-04- 2020-02- 2020-04- 2020-03- 2020-06- 2020-03- 2020-06- 2020-06- 2020-12- tructurada en educación, g TF / A5789 ograms for Sustainable La Posterior Individual Limited 3,871.00 3,219.72 Finalizado 2 23 17 24 02 01 18 23 17 10 estión y conservación de u ndscape Management so sostenible del territorio siguiendo los lineamientos pedagógicos ONDAS CO-PNF-118108-CS-INDV / Component 4 - Project Coo Consultor social de la evalu rdination, Management, M 2019-12-1 2020-02- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-04- 2020-08- ación de medio término de TF / A5789 Posterior Individual Limited 9,677.00 7,336.80 Finalizado onitoring and Evaluation ( 8 03 23 03 06 02 22 27 22 04 la iniciativa Conservación d M&E) e bosques y sostenibilidad en el corazón de la amazon ia CO-PNF-123094-CS-INDV / Component 4 - Project Coo Consultor que lidere la eval rdination, Management, M 2019-12-1 2020-01- 2019-12- 2020-01- 2020-01- 2020-01- 2020-01- 2020-02- 2020-05- 2020-09- TF / A5789 Posterior Individual Limited 15,484.00 14,152.80 Finalizado uación de medio término d onitoring and Evaluation ( 8 09 23 09 06 28 20 27 20 08 e GEF Corazón de la Amazo M&E) nia. CO-PNF-150302-CS-CDS / Component 4 - Project Coo Selección direct 2019-12-3 2019-12- 2020-01- 2020-01- 2020-01- 2020-02- 2021-01- 2021-01- Coordinación General del P TF / A5789 rdination, Management, M Posterior a de consultore Direct 50,496.00 46,247.23 Finalizado 0 19 09 03 30 02 24 29 royecto- 2020. onitoring and Evaluation ( s M&E) CO-PNF-150304-CS-CDS / Component 4 - Project Coo Selección direct 2019-12-3 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2021-01- 2021-01- Especialista Financiera- 20 TF / A5789 rdination, Management, M Posterior a de consultore Direct 35,535.00 32,258.15 Finalizado 0 19 09 30 30 20 24 02 20. onitoring and Evaluation ( s M&E) CO-PNF-150306-CS-CDS / Coordinación técnica accio nes asociadas con la imple Component 1 - Protected Selección direct 2019-12-3 2019-12- 2020-01- 2019-12- 2020-01- 2020-02- 2021-01- 2021-01- mentación de Herencia Col TF / A5789 Areas Management and Fi Posterior a de consultore Direct 34,219.00 31,159.94 Finalizado 0 18 09 30 30 10 24 30 ombia - GEF Corazón Amaz nancial Sustainability s onia y la DTAM - PNN y CO RPOAMAZONIA y apoyo a l a preparación GEF7 CA. CO-PNF-150310-CS-CDS / Component 3 - Sectoral Pr Selección direct Profesional de apoyo para l 2019-12-3 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2021-01- 2021-01- TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 32,876.00 29,844.06 Finalizado a implementación de acuer 0 18 09 30 30 20 24 04 ndscape Management s dos con el sector de infraes tructura vial. CO-PNF-150313-CS-CDS / Profesional apoyo a la CDA Component 3 - Sectoral Pr Selección direct 2019-12-3 2019-12- 2020-01- 2020-01- 2020-01- 2020-03- 2021-01- 2021-05- en la incorporación de crite TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 19,204.00 17,322.52 Finalizado 0 19 09 27 30 08 24 05 rios ambientales para proy ndscape Management s ectos de red vial terciarias - 2020. CO-PNF-150315-CS-CDS / Profesional apoyo a la Corp Component 3 - Sectoral Pr Selección direct 2019-12-3 2020-01- 2020-01- 2020-01- 2020-01- 2020-03- 2021-01- 2021-05- oamazonia en la incorporac TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 19,204.00 16,998.68 Finalizado 0 15 09 28 30 13 24 06 ión de criterios ambientale ndscape Management s s para proyectos de red via l terciarias - 2020. CO-PNF-150316-CS-CDS / Profesional apoyo a la gesti Component 3 - Sectoral Pr Selección direct 2019-12-3 2019-12- 2020-01- 2020-01- 2020-01- 2020-02- 2021-01- 2021-02- ón territorial y de seguimie TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 32,206.00 29,236.15 Finalizado 0 19 09 03 30 08 24 01 nto a la planeación y ejecu ndscape Management s ción operativa regional (Ca quetá - Putumayo) - 2020. CO-PNF-150321-CS-CDS / Profesional apoyo a la gesti Component 3 - Sectoral Pr Selección direct 2019-12-3 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2021-01- 2021-01- ón territorial y de seguimie TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 27,097.00 24,597.72 Finalizado 0 19 09 30 30 26 24 07 nto a la planeación y ejecu ndscape Management s ción operativa regional (Gu aviare). CO-PNF-150322-CS-CDS / Profesional agroforestal im Component 3 - Sectoral Pr Selección direct 2019-12-3 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2021-01- 2021-01- plementación de acuerdos TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 22,142.00 20,099.85 Finalizado 0 19 09 30 30 20 24 02 de conservación, restauraci ndscape Management s ón y no deforestación en la s áreas de intervención CD A. CO-PNF-118109-CS-INDV / Consultor financiero de la e Component 4 - Project Coo valuación de medio términ rdination, Management, M 2020-01-0 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-02- 2020-03- 2020-05- 2020-08- TF / A5789 Posterior Individual Limited 9,677.00 7,336.80 Finalizado o de la Iniciativa Conservac onitoring and Evaluation ( 3 03 08 03 22 10 07 22 08 04 ión de bosques y sostenibil M&E) idad en el Corazón de la A mazonia CO-PNF-150398-CS-CDS / Prestar sus servicios profes ionales para orientar y serv ir de enlace técnico de COR Component 3 - Sectoral Pr Selección direct 2020-02-0 2020-02- 2020-02- 2020-02- 2020-03- 2020-02- 2021-03- 2021-02- POAMAZONIA y el Proyecto TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 40,645.00 37,011.24 Finalizado 7 04 17 05 09 28 04 05 “Conservación de bosques ndscape Management s y sostenibilidad para la imp lementación de las líneas d e acción de nuevas áreas p rotegidas, restauración de áreas degradad CO-PNF-161550-CS-CDS / Prestar sus servicios profes ionales para orientar el pro Component 4 - Project Coo Selección direct ceso de comunicación y ge rdination, Management, M 2020-03-3 2020-03- 2020-04- 2020-03- 2020-05- 2020-05- 2021-05- 2021-05- TF / A5789 Posterior a de consultore Direct 36,232.00 27,829.53 Finalizado stión del conocimiento del onitoring and Evaluation ( 0 17 09 19 07 07 02 23 s Proyecto GEF CA que permi M&E) ta posicionar su implement ación con actores estratégi cos, mostrar y sistematizar avances, resultados y logro CO-PNF-161553-CS-CDS / s. Prestar sus servicios profes ionales para Diseñar y desa Component 4 - Project Coo Selección direct rrollar los contenidos gráfic rdination, Management, M 2020-03-3 2020-03- 2020-04- 2020-03- 2020-05- 2020-04- 2021-05- 2021-04- TF / A5789 Posterior a de consultore Direct 32,206.00 24,780.29 Finalizado os multiformato requeridos onitoring and Evaluation ( 0 17 09 19 07 07 02 17 s para la implementación de M&E) la Estrategia de comunicac iones y gestión del conoci miento de la Iniciativa GEF Corazón de la Amazonia. CO-PNF-161555-CS-CDS / Prestar los servicios profesi onales para brindar el sopo rte jurídico y político que d Component 3 - Sectoral Pr Selección direct 2020-03-3 2020-03- 2020-04- 2020-03- 2020-05- 2020-04- 2021-05- 2021-05- emande la Unidad de Coor TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 42,674.00 32,818.01 Finalizado 0 17 09 19 07 24 02 11 dinación del Proyecto para ndscape Management s el desarrollo de los compon entes del GEF Corazón Am azonía, para el manejo sost enible del paisaje, especial mente en tema CO-PNF-161564-CS-CDS / Component 4 - Project Coo Selección direct Profesional apoyo salvagua rdination, Management, M 2020-03-3 2020-03- 2020-04- 2020-03- 2020-05- 2020-04- 2020-10- 2020-12- TF / B1287 Posterior a de consultore Direct 5,000.00 3,723.00 Finalizado rdas ambientales y sociales onitoring and Evaluation ( 0 17 09 19 07 10 04 21 s (preparación de document M&E) os) CO-PNF-75462-CS-INDV / A nalista espacial para la revi Component 2 - Forest Gov sión, corrección, compleme 2018-09-2 2018-09- 2018-10- 2018-11- 2019-03- TF / A5789 ernance, Management and Posterior Individual Limited 6,429.00 0.00 Cancelado ntación y unificación de la i 0 25 16 13 15 Monitoring nformación de accesibilida d, interpretada en la Amaz onía colombiana- IDEAM CO-PNF-123097-CS-INDV / Construcción Estrategia de Component 3 - Sectoral Pr difusión y divulgación Sitio 2020-06-3 2020-05- 2020-07- 2020-05- 2020-07- 2020-06- 2020-08- 2020-07- 2020-12- 2021-01- TF / A5789 ograms for Sustainable La Posterior Individual Limited 6,452.00 5,518.80 Finalizado Ramsar Estrella Fluvial del I 0 14 05 15 19 09 02 14 30 14 ndscape Management nírida - EFI, con la Mesa Ra msar EFI y articulada a la E strategia de Comunicacion es de GEF CA. CO-PNF-150320-CS-CDS / Profesional que coordine y oriente la implementación Component 3 - Sectoral Pr Selección direct 2020-06-3 2020-04- 2020-07- 2020-04- 2020-07- 2020-06- 2021-07- 2021-06- de acuerdos de conservaci TF / A5789 ograms for Sustainable La Posterior a de consultore Direct 27,097.00 22,580.88 Finalizado 0 27 10 28 31 02 26 02 ón, restauración y no defor ndscape Management s estación en las áreas de int ervención CDA y demás lín eas de acción que adelanta la CDA. CO-PNF-161574-CS-INDV / Component 4 - Project Coo 2020-03-3 2020-04- 2020-04- 2020-05- 2020-11- Consultor para el analisis e TF / B1287 rdination, Management, M Posterior Individual Limited 4,000.00 0.00 Cancelado 0 07 22 08 04 conomico y financiero del p onitoring and Evaluation ( royecto M&E) Component 4 - Project Coo CO-PNF-150130-CS-INDV / 2020-01-0 2020-02- 2020-01- 2020-02- 2020-01- 2020-01- 2020-10- TF / B1287 rdination, Management, M Posterior Individual Limited 36,000.00 0.00 Cancelado Coordinador de la PPG 6 19 11 19 16 30 26 onitoring and Evaluation ( M&E) Page 9 CO-PNF-167966-CS-INDV / Profesional enlace de CORP OAMAZONIA en el proceso de concertación comunitari Component 1 - Protected 2020-06-3 2020-04- 2020-07- 2020-04- 2020-07- 2020-05- 2020-08- 2020-06- 2021-08- 2021-05- a e institucional, zonificació TF / A5789 Areas Management and Fi Posterior Individual Limited 27,097.00 22,580.88 Finalizado 0 14 08 14 23 14 08 09 03 20 n ambiental y ordenamient nancial Sustainability o productivo con fines de manejo de la Reserva Fore stal de la Amazonia y áreas de sustracción en la zona d el Bajo Caguán, de CO-PNF-144816-CS-INDV / Profesional que desarrolle actividades de seguimiento , orientación, articulación y Component 3 - Sectoral Pr 2019-11-2 2020-02- 2019-12- 2019-12- 2019-12- 2020-09- desarrollo de procesos juríd TF / A5789 ograms for Sustainable La Posterior Individual Limited 11,613.00 0.00 Cancelado 9 28 04 09 23 20 icos y legales, en cumplimi ndscape Management ento de la sentencia STC43 60-2018, conforme al Plan de Acción para la lucha con tra la deforestación en juris dicción d CO-PNF-167988-CS-INDV / Prestar los servicios profesi onales encaminados en ge nerar acciones para la impl Component 3 - Sectoral Pr 2020-06-3 2020-05- 2020-07- 2020-05- 2020-07- 2020-05- 2020-07- 2020-06- 2021-04- 2021-03- ementación de actividades TF / A5789 ograms for Sustainable La Posterior Individual Direct 14,516.00 12,073.95 Finalizado 0 07 10 12 17 22 31 17 27 16 en el manejo de las áreas d ndscape Management e uso sostenible y en siste mas de producción no tradi cionales en los sitios Rams ar Lagos de Tarapoto y Estr ella Fluvial In CO-PNF-167972-CS-INDV / Profesionales apoyo técnic o a la consolidación de acu erdos en Áreas y temas de Component 3 - Sectoral Pr 2020-06-3 2020-04- 2020-07- 2020-04- 2020-07- 2020-07- 2021-03- Interés común con los resg TF / A5789 ograms for Sustainable La Posterior Individual Direct 16,462.00 0.00 Cancelado 0 15 10 17 17 31 28 uardos colindantes al Parqu ndscape Management e Nacional Serranía de Chir ibiquete que contribuyan al mejoramiento de la gobern anza ambiental del territori o. CO-PNF-150327-CS-INDV / Profesional que coordine la implementación de accione Component 1 - Protected s de seguimiento y monitor 2019-12-3 2020-04- 2020-01- 2020-01- 2020-02- 2021-02- TF / A5789 Areas Management and Fi Posterior Individual Limited 34,839.00 0.00 Cancelado eo, sostenibilidad financier 0 07 07 22 07 01 nancial Sustainability a y operación técnica, en lo s mosaicos priorizados par a la fase 1 de Herencia Col ombia, en el marco de Cora zón Amazonia. CO-PNF-167983-CS-INDV / Prestar los servicios profesi onales para elaborar la estr ategia de apoyo al program Component 3 - Sectoral Pr 2020-06-3 2020-05- 2020-07- 2020-05- 2020-07- 2020-05- 2020-08- 2020-06- 2021-05- 2021-09- a de control y vigilancia pa TF / A5789 ograms for Sustainable La Posterior Individual Direct 14,516.00 16,302.75 Finalizado 0 08 10 12 20 22 06 17 03 10 ra el sitio Ramsar Estrella F ndscape Management luvial Inírida y la estrategia de apoyo al Programa Moni toreo y Vigilancia para el si tio Ramsar Complejo de Hu medal CO-PNF-178655-CS-INDV / Component 4 - Project Coo 2020-07-3 2020-06- 2020-08- 2020-07- 2020-08- 2020-07- 2020-08- 2020-07- 2021-08- 2021-07- Especialista en Adquisicion TF / A5789 rdination, Management, M Posterior Individual Direct 36,232.00 30,616.19 Finalizado 0 19 09 08 16 10 30 29 25 21 es proyecto GEF Corazón d onitoring and Evaluation ( e la Amazonia. M&E) CO-PNF-178657-CS-INDV / Profesional armonización d el Plan de Desarrollo Depar tamental - PDD y Plan de O Component 3 - Sectoral Pr 2020-06-3 2020-06- 2020-07- 2020-07- 2020-07- 2020-07- 2020-07- 2020-08- 2020-10- 2020-12- rdenamiento Territorial De TF / A5789 ograms for Sustainable La Posterior Individual Direct 7,742.00 6,387.60 Finalizado 0 18 10 06 17 27 31 19 29 17 partamental – POTD, confor ndscape Management me a la dimensión ambient al (aspectos biofísicos), gen erando escenarios de planif icación territorial estratégic a para la ges CO-PNF-178659-CS-INDV / Profesional que generé info rmación espacial para la im plementación de los Acuer Component 3 - Sectoral Pr 2020-06-3 2020-06- 2020-07- 2020-06- 2020-07- 2020-07- 2020-07- 2020-08- 2021-07- 2021-08- dos de Conservación, Resta TF / A5789 ograms for Sustainable La Posterior Individual Direct 16,103.00 13,607.19 Finalizado 0 18 10 23 17 10 31 04 26 25 uración y no Deforestación, ndscape Management en el Departamento del Gu aviare, Jurisdicción de la Co rporación para el Desarroll o Sostenible del Norte y del Oriente Amaz CO-PNF-178660-CS-INDV / Profesional que oriente y ej ecute las acciones program adas por CORPOAMAZONIA Component 3 - Sectoral Pr 2020-06-3 2020-06- 2020-07- 2020-06- 2020-07- 2020-07- 2020-07- 2020-07- 2021-07- 2021-08- para el establecimiento y TF / A5789 ograms for Sustainable La Posterior Individual Direct 28,181.00 23,812.59 Finalizado 0 18 10 26 17 01 31 27 26 20 mantenimiento de los acue ndscape Management rdos de conservación, resta uración y no deforestación, en el municipio de Cartage na del Chairá departament o del Caquetá. CO-PNF-178664-CS-INDV / Profesional que elabore la Estrategia y Plan de Adquis Component 4 - Project Coo iciones, y apoyar la actualiz rdination, Management, M 2020-06-3 2020-06- 2020-07- 2020-08- 2020-07- 2020-08- 2020-07- 2020-09- 2020-10- 2021-02- TF / B1287 Posterior Individual Direct 4,645.00 3,303.99 Finalizado ación del Manual Operativo onitoring and Evaluation ( 0 26 10 18 17 19 31 11 29 12 del Proyecto con sus respe M&E) ctivos Anexos, en los tema s de adquisiciones, en el m arco de la formulación del nuevo financiamiento de G CO-PNF-182823-CS-INDV / EF Coordinación concertación y generación de insumos té Component 4 - Project Coo cnicos para la preparación rdination, Management, M 2020-07-3 2020-08- 2020-08- 2020-08- 2020-08- 2020-08- 2020-08- 2020-09- 2021-01- 2021-03- del nuevo financiamiento a TF / B1287 Posterior Individual Direct 4,925.00 4,292.15 Finalizado onitoring and Evaluation ( 0 14 09 21 16 25 30 21 27 03 dicional de GEF Corazón de M&E) la Amazonia a través del G EF7 con las entidades socia s, las áreas de Patrimonio Natural y el punto focal del GEF en el MADS CO-PNF-182726-CS-INDV / Prestar sus servicios profes ionales para realizar los do Component 4 - Project Coo cumentos y anexos enfoca rdination, Management, M 2020-07-3 2020-08- 2020-08- 2020-08- 2020-08- 2020-08- 2020-09- 2020-09- 2021-02- 2021-03- dos a los temas financieros TF / B1287 Posterior Individual Direct 3,582.00 3,121.56 Finalizado onitoring and Evaluation ( 0 14 22 21 30 25 13 29 10 12 y consolidación de las contr M&E) apartidas en especie, en el marco de la formulación de l nuevo financiamiento de GEF Corazón de la Amazoni a (GEF7). CO-PNF-189689-CS-INDV / Sistematizar la experiencia Component 4 - Project Coo y documentar la implement rdination, Management, M 2020-09-3 2020-08- 2020-10- 2020-09- 2020-10- 2020-09- 2020-10- 2020-10- 2021-10- 2021-10- ación del proyecto GEF Cor TF / A5789 Posterior Individual Direct 20,490.00 17,855.32 Finalizado onitoring and Evaluation ( 0 27 10 03 17 10 31 10 26 09 azón de la Amazonia y reali M&E) zar el seguimiento a la apli cación de los instrumentos de salvaguardas sociales. CO-PNF-150129-CS-INDV / Component 4 - Project Coo 2020-01-0 2020-02- 2020-01- 2020-01- 2020-01- 2020-05- Especialista en cadena de TF / B1287 rdination, Management, M Posterior Individual Limited 10,000.00 0.00 Cancelado 6 25 11 16 30 29 valor productiva sostenible onitoring and Evaluation ( PPG. M&E) CO-PNF-150325-CS-INDV / Component 3 - Sectoral Pr Profesional que defina el pl 2020-06-3 2020-07- 2020-07- 2020-08- 2021-08- TF / A5789 ograms for Sustainable La Posterior Individual Limited 19,355.00 0.00 Cancelado an de negocio y priorizació 0 08 23 07 02 ndscape Management n de productos para el enc adenamiento productivo CO-PNF-194030-CS-INDV / Prestar sus servicios profes ionales para definir e impl Component 1 - Protected ementar criterios y lineami 2020-12-3 2020-10- 2021-01- 2020-10- 2021-01- 2020-11- 2021-02- 2020-12- 2021-11- 2021-12- TF / A5789 Areas Management and Fi Posterior Individual Limited 12,090.00 15,358.28 Finalizado entos técnicos para realizar 0 07 07 08 22 12 07 11 04 25 nancial Sustainability el proceso de zonificación a mbiental a escala 1:25.000 con fines de manejo de la r eserva forestal de la Amaz onia y áreas de sustracción CO-PNF-194036-CS-INDV / Prestar sus servicios profes ionales para generar y proc Component 1 - Protected esar información espacial a 2020-12-3 2020-12- 2021-01- 2020-12- 2021-01- 2021-01- 2021-02- 2021-02- 2021-08- 2022-02- TF / A5789 Areas Management and Fi Posterior Individual Limited 8,060.00 13,342.01 Finalizado escala 1:25.000 orientada 0 03 07 10 22 13 07 01 06 03 nancial Sustainability a la zonificación ambiental y ordenamiento con fines d e manejo de la Reserva For estal de la Amazonia y área s de sustracción CO-PNF-194040-CS-INDV / Prestar sus servicios profes ionales en la elaboración d Component 1 - Protected el componente social en el 2020-12-3 2020-10- 2021-01- 2020-10- 2021-01- 2020-11- 2021-02- 2020-12- 2021-11- 2022-01- TF / A5789 Areas Management and Fi Posterior Individual Limited 12,090.00 15,358.28 Finalizado proceso de concertación co 0 07 07 08 22 09 07 11 04 09 nancial Sustainability munitaria e institucional pa ra la zonificación ambiental y el ordenamiento a escala 1:25.000 en la Reserva For estal de la Amazonia CO-PNF-197247-CS-INDV / Prestar sus servicios profes ionales para apoyar la reali Component 4 - Project Coo zación de procesos de adq rdination, Management, M 2020-10-3 2020-10- 2020-11- 2020-10- 2020-11- 2020-10- 2020-11- 2020-11- 2021-11- 2021-01- TF / A5789 Posterior Individual Direct 19,744.00 17,317.16 Finalizado uisiciones y contrataciones onitoring and Evaluation ( 0 02 09 05 16 07 30 02 25 10 que se requieran de acuerd M&E) o con lo establecido en el A cuerdo Legal de Donación, el Manual Operativo del Pro yecto, el Plan de Adquisicio CO-PNF-200244-CS-INDV / nes Apoyar a la Coordinación G eneral del Proyecto “Conse Component 4 - Project Coo rvación de Bosques y Soste rdination, Management, M 2020-12-3 2020-10- 2021-01- 2020-11- 2021-01- 2020-12- 2021-01- 2020-12- 2022-01- 2021-12- TF / A5789 Posterior Individual Direct 33,528.00 32,836.75 Finalizado nibilidad en el Corazón de l onitoring and Evaluation ( 0 29 09 10 16 04 30 19 25 20 a Amazonía”, en el seguimi M&E) ento y documentación de l os procesos de programaci ón, ejecución y evaluación de la iniciativa. CO-PNF-200246-CS-INDV / Orientar y acompañar los p rocesos de concertación y f ortalecimiento de capacida Component 1 - Protected 2020-12-3 2020-10- 2021-01- 2020-10- 2021-01- 2020-11- 2021-01- 2020-12- 2022-01- 2022-02- des con las comunidades y TF / A5789 Areas Management and Fi Posterior Individual Direct 18,376.00 17,997.07 Finalizado 0 29 09 30 16 17 30 02 25 03 organizaciones sociales par nancial Sustainability a el desarrollo de la ruta de declaratoria de un área pro tegida regional, la gestión de estrategias complement arias CO-PNF-170216-CS-INDV / Profesional en el área de co municación, que realicer la Component 4 - Project Coo preproducción, producción rdination, Management, M 2020-06-3 2020-08- 2020-07- 2020-07- 2020-08- 2020-09- y posproducción de un víde TF / B1287 Posterior Individual Limited 2,419.00 0.00 Cancelado onitoring and Evaluation ( 0 05 08 23 08 07 o que brinde información d M&E) e GEF Corazón de la Amazo nia - GEF 7 de animación di gital de tres (3) minutos de duración en formato HD y o ptimizado para CO-PNF-161567-CS-INDV / Component 4 - Project Coo Asistente técnico para la pr rdination, Management, M 2020-09-3 2020-10- 2020-10- 2020-11- 2021-05- TF / B1287 Previa Individual Limited 5,807.00 0.00 Cancelado eparación del proyecto cor onitoring and Evaluation ( 0 08 23 14 13 azón de la Amazonía GEF 7 M&E) CO-PNF-204767-CS-INDV / Profesional de Apoyo técnic Component 3 - Sectoral Pr 2020-12-3 2020-11- 2021-01- 2020-11- 2021-01- 2020-12- 2021-01- 2021-01- 2022-01- 2022-01- o para los procesos de Adq TF / A5789 ograms for Sustainable La Posterior Individual Direct 17,910.00 17,546.40 Finalizado 0 24 09 26 16 14 30 07 25 09 uisiciones y contratación e ndscape Management n los departamentos del Ca quetá y Putumayo CO-PNF-161559-CS-INDV / Profesional de apoyo para Component 4 - Project Coo el seguimiento, consolidaci rdination, Management, M 2020-08-3 2020-09- 2020-09- 2020-10- 2021-04- ón y análisis de informació TF / A5789 Posterior Individual Limited 10,746.00 0.00 Cancelado onitoring and Evaluation ( 0 07 22 14 12 n de las iniciativas del Fond M&E) o para el Medio Ambiente Mundial orientadas por el Ministerio de Ambiente y D esarrollo Sostenible CO-PNF-170213-CS-INDV / Component 3 - Sectoral Pr 2020-12-3 2021-01- 2021-01- 2021-02- 2021-08- Profesional de apoyo en ad TF / A5789 ograms for Sustainable La Posterior Individual Limited 9,677.00 0.00 Cancelado 0 07 22 07 06 quisiciones para la CAZ, se ndscape Management de Florencia, caqueta. CO-PNF-200248-CS-INDV / Prestar sus servicios profes ionales de apoyo en el com ponente de ordenamiento Component 1 - Protected 2020-12-3 2020-12- 2021-01- 2020-12- 2021-01- 2021-01- 2021-02- 2021-02- 2021-11- 2021-09- a escala 1:25.000 con fines TF / A5789 Areas Management and Fi Posterior Individual Limited 12,090.00 11,583.00 Finalizado 0 03 07 04 22 13 07 17 04 20 de manejo de la Reserva F nancial Sustainability orestal de la Amazonia y ár eas de sustracción en la zo na del Bajo Caguán, depart amento del Caquetá, como estrategia CO-PNF-171670-CS-INDV / Prestar sus servicios profes ionales con el fin de realiza Component 4 - Project Coo r la preproducción, producc rdination, Management, M 2020-12-3 2021-01- 2021-01- 2021-02- 2021-06- TF / B1287 Posterior Individual Limited 15,821.00 0.00 Cancelado ión y posproducción de pie onitoring and Evaluation ( 0 07 22 07 07 zas comunicativas multime M&E) dia en formato digital con e l fin de facilitar la distribuci ón y divulgación de los av ances en la implementació nCO-PNF-170214-CS-INDV / Profesional de Apoyo técnic Component 3 - Sectoral Pr 2020-12-3 2021-01- 2021-01- 2021-02- 2021-08- o para los procesos de Adq TF / A5789 ograms for Sustainable La Posterior Individual Limited 9,677.00 0.00 Cancelado 0 07 22 07 06 uisiciones y contratación e ndscape Management n el departamento del Gua viare- CDA. CO-PNF-210770-CS-INDV / Ejercer la coordinación gen eral del Proyecto “Conserv Component 4 - Project Coo ación de Bosques y Sosteni rdination, Management, M 2021-03-3 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- 2022-01- TF / A5789 Posterior Individual Direct 49,028.00 47,238.22 Finalizado bilidad en el Corazón de la onitoring and Evaluation ( 0 29 09 04 16 05 30 10 10 18 Amazonia”, de conformida M&E) d con los lineamientos esta blecidos en el Acuerdo Inte rinstitucional y el Manual O perativo. CO-PNF-210776-CS-INDV / Prestar servicios profesiona les como Especialista finan Component 4 - Project Coo ciero del Proyecto y orienta rdination, Management, M 2021-03-3 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- 2021-12- TF / A5789 Posterior Individual Direct 34,199.00 32,950.44 Finalizado r a las entidades socias en l onitoring and Evaluation ( 0 28 09 04 16 05 30 17 10 28 os procedimientos fiduciari M&E) os de conformidad con las directrices financieras del B anco Mundial y procedimie ntos de Patrimonio Natural. CO-PNF-210779-CS-INDV / Prestar sus servicios profes ionales para apoyar a la co Component 4 - Project Coo ordinación general del proy rdination, Management, M 2021-03-3 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- 2022-01- TF / A5789 Posterior Individual Direct 30,995.00 29,906.15 Finalizado ecto “Conservación y Soste onitoring and Evaluation ( 0 29 09 04 16 12 30 17 10 23 nibilidad de Bosques en el M&E) Corazón de la Amazonia” c omo enlace regional que fa cilite la gestión territorial. CO-PNF-210781-CS-INDV / Prestar sus servicios profes ionales para apoyar a la Co Component 4 - Project Coo ordinación General del proy rdination, Management, M 2021-03-3 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- 2022-01- TF / A5789 Posterior Individual Direct 26,078.00 25,090.67 Finalizado ecto “Conservación y Soste onitoring and Evaluation ( 0 28 09 04 16 15 30 26 10 23 nibilidad de Bosques en el M&E) Corazón de la Amazonia” c omo enlace regional que fa cilite la gestión territorial. CO-PNF-210786-CS-INDV / Prestar sus servicios profes ionales para el diseño, impl Component 2 - Forest Gov 2021-03-3 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- 2021-12- ementación y validación de TF / A5789 ernance, Management and Posterior Individual Direct 32,239.00 29,950.56 Finalizado 0 28 09 04 16 15 30 31 10 28 l sistema de control de cali Monitoring dad del Sistema de Monitor eo de Bosques y Carbono a nivel nacional y/o regional. CO-PNF-210794-CS-INDV / Prestar sus servicios profes ionales para apoyar en el s Component 2 - Forest Gov eguimiento técnico y opera 2021-03-3 2021-02- 2021-04- 2021-02- 2021-04- 2021-02- 2021-04- 2021-03- 2022-04- 2021-12- TF / A5789 ernance, Management and Posterior Individual Direct 25,075.00 23,679.60 Finalizado tivo de las actividades rela 0 03 09 03 16 10 30 01 10 29 Monitoring cionadas con la continuida d en la operación del Siste ma de Monitoreo de Bosqu es y Carbono para Colombi a – SMBYC. CO-PNF-210797-CS-INDV / Prestar sus servicios profes ionales para generar Alerta Component 2 - Forest Gov s Tempranas de Deforestac 2021-03-3 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-02- 2022-04- 2022-01- TF / A5789 ernance, Management and Posterior Individual Direct 22,997.00 21,838.53 Finalizado ión e información temática 0 29 09 06 16 18 30 11 10 09 Monitoring de monitoreo de la superfic ie de bosque y deforestació n a nivel nacional y/o regio nal, con especial dedicació n al Componente 2. CO-PNF-210799-CS-INDV / Prestar sus servicios profes ionales para generar la info Component 2 - Forest Gov rmación de Alertas Tempra 2021-03-3 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- 2021-12- TF / A5789 ernance, Management and Posterior Individual Direct 22,997.00 21,364.73 Finalizado nas de Deforestación, así c 0 29 09 04 16 18 30 30 10 28 Monitoring omo en la generación de in formación temática de mon itoreo de la superficie de b osque y deforestación a niv el nacional y/o regional. CO-PNF-210802-CS-INDV / Prestar sus servicios profes ionales para apoyar la gen Component 4 - Project Coo eración de información tem rdination, Management, M 2021-03-3 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- 2021-12- TF / A5789 Posterior Individual Direct 21,493.00 19,967.04 Finalizado ática de monitoreo de alert onitoring and Evaluation ( 0 29 09 04 16 15 30 31 10 28 as tempranas de deforesta M&E) ción y minería ilegal en áre as de interés de la Direcció n Territorial Amazonia -DTA M. CO-PNF-210804-CS-INDV / Prestar sus servicios profes ionales para desarrollar las Component 4 - Project Coo acciones de comunicación, rdination, Management, M 2021-03-3 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- 2022-01- TF / A5789 Posterior Individual Direct 32,932.00 31,685.93 Finalizado coordinación y orientación onitoring and Evaluation ( 0 28 09 04 16 15 30 26 10 09 técnica necesarias para as M&E) egurar la articulación entre los niveles local (6 áreas pr iorizadas), regional (DTAM) y nacional de PNN. CO-PNF-210806-CS-INDV / Prestar sus servicios profes ionales con el fin de coordi Component 4 - Project Coo nar el apoyo técnico para l rdination, Management, M 2021-03-3 2020-12- 2021-04- 2021-02- 2021-04- 2021-02- 2021-04- 2021-03- 2022-02- 2022-01- TF / A5789 Posterior Individual Direct 18,627.00 18,195.65 Finalizado a consolidación e impleme onitoring and Evaluation ( 0 28 09 04 16 16 30 07 24 30 ntación de los acuerdos en M&E) áreas y temas de Interés c omún con los resguardos c olindantes al Parque Nacio nal Serranía de Chiribiquet CO-PNF-210809-CS-INDV / e. Prestar sus servicios profes ionales para realizar las ac Component 4 - Project Coo ciones encaminadas a la fo rdination, Management, M 2021-03-3 2021-02- 2021-04- 2021-02- 2021-04- 2021-02- 2021-04- 2021-02- 2022-04- 2022-02- TF / A5789 Posterior Individual Direct 31,640.00 29,080.24 Finalizado rmulación de recomendaci onitoring and Evaluation ( 0 03 09 04 16 12 30 24 10 09 ones técnicas ambientales, M&E) brindando la asesoría nece saria para su incorporación en lineamientos técnicos. Page 10 CO-PNF-210813-CS-INDV / Prestar sus servicios profes Component 4 - Project Coo ionales para coordinar, imp rdination, Management, M 2021-03-3 2021-02- 2021-04- 2021-02- 2021-04- 2021-02- 2021-04- 2021-03- 2022-04- 2022-05- ulsar, acompañar la gestió TF / A5789 Posterior Individual Direct 37,161.00 35,095.66 Finalizado onitoring and Evaluation ( 0 23 09 24 16 10 30 22 10 13 n interinstitucional y adopci M&E) ón de acuerdos, criterios y herramientas de planeació n y gestión ambiental soste nible. CO-PNF-210814-CS-INDV / Prestar sus servicios profes ionales para liderar y orient Component 3 - Sectoral Pr ar las actividades de consol 2021-03-3 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- 2021-12- TF / A5789 ograms for Sustainable La Posterior Individual Direct 21,309.00 20,416.28 Finalizado idación, establecimiento y 0 29 09 04 16 15 30 30 10 28 ndscape Management evaluación de los acuerdos de conservación, restauraci ón y no deforestación, en l as áreas priorizadas por la Corporación. CO-PNF-210815-CS-INDV / Prestar sus servicios profes ionales para servir de enlac Component 1 - Protected e entre Corpoamazonia y el 2021-03-3 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-02- 2022-04- 2022-02- TF / A5789 Areas Management and Fi Posterior Individual Direct 39,116.00 37,477.44 Finalizado Proyecto “Conservación de 0 28 09 14 16 28 30 07 10 09 nancial Sustainability bosques y sostenibilidad en el Corazón de la Amazonia” para la implementación de las líneas de acción de área s protegidas. CO-PNF-210818-CS-INDV / Prestar sus servicios profes ionales para liderar y orient Component 1 - Protected ar la implementación de la 2021-03-3 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-02- 2022-02- 2021-12- TF / A5789 Areas Management and Fi Posterior Individual Direct 17,910.00 16,969.80 Finalizado ruta de declaratoria de áre 0 29 09 04 16 15 30 03 24 29 nancial Sustainability a protegida regional y la ge stión de estrategias comple mentarias de conservación, mediante proceso de const rucción. CO-PNF-210789-CS-INDV / Prestar sus servicios profes ionales para apoyar a la co Component 2 - Forest Gov ordinación del SMBYC y a l 2021-03-3 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- 2021-12- TF / A5789 ernance, Management and Posterior Individual Direct 25,075.00 24,125.64 Finalizado a Subdirección de Ecosiste 0 30 09 04 16 18 30 30 10 28 Monitoring mas e Información Ambient al del IDEAM en las activida des de seguimiento y moni toreo administrativo, financ iero y de planeación. CO-PNF-210783-CS-INDV / Prestar sus servicios profes ionales para liderar la conti Component 2 - Forest Gov nuidad en la operación del 2021-03-3 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-02- 2022-04- 2022-01- TF / A5789 ernance, Management and Posterior Individual Direct 39,403.00 37,752.00 Finalizado componente técnico de Mo 0 05 09 06 16 28 30 14 10 08 Monitoring nitoreo de la deforestación y/o degradación forestal de l Sistema de Monitoreo de Bosques y Carbono (SMBYC ). CO-PNF-223118-CS-INDV / Prestar sus servicios profes ionales para brindar orient Component 1 - Protected ación técnica a los análisis 2021-06-3 2021-03- 2021-07- 2021-03- 2021-07- 2021-04- 2021-07- 2021-04- 2022-02- 2021-12- TF / A5789 Areas Management and Fi Posterior Individual Direct 26,119.00 23,572.50 Finalizado especializados y articular lo 0 25 10 26 17 08 31 29 26 10 nancial Sustainability s lineamientos y recomend aciones en materia de gob ernanza territorial e instru mentos económico-financie ros. CO-PNF-223130-CS-INDV / Realizar el análisis económi co de estrategias de manej o sostenible del paisaje, a Component 1 - Protected 2021-06-3 2021-03- 2021-07- 2021-03- 2021-07- 2021-04- 2021-07- 2021-05- 2022-01- 2022-08- partir de la valoración econ TF / A5789 Areas Management and Fi Posterior Individual Direct 16,299.00 28,402.37 Finalizado 0 25 10 25 17 12 31 07 27 01 ómica y análisis costo bene nancial Sustainability ficio privado y ambiental d e acciones de transición pr oductiva, restauración ecol ógica y abatimiento de car bono. CO-PNF-223133-CS-INDV / Prestar sus servicios profes ionales como experto en a nálisis y modelación de dat Component 1 - Protected 2021-06-3 2021-04- 2021-07- 2021-04- 2021-07- 2021-04- 2021-08- 2021-05- 2022-02- 2021-07- os espaciales para la gener TF / A5789 Areas Management and Fi Posterior Individual Limited 12,537.00 11,314.80 Finalizado 0 07 08 21 23 30 08 21 04 27 ación de insumos que contr nancial Sustainability ibuyan en el análisis de los beneficios económicos de l a restauración y la evaluaci ón de la viabilidad de proye ctos REDD+ CO-PNF-223135-CS-INDV / Profesional de apoyo para Component 4 - Project Coo el seguimiento, consolidaci rdination, Management, M 2021-06-3 2021-05- 2021-07- 2021-05- 2021-07- 2021-06- 2021-08- 2021-07- 2022-02- 2022-06- ón y análisis de informació TF / A5789 Posterior Individual Limited 10,746.00 9,416.16 Finalizado onitoring and Evaluation ( 0 13 08 18 23 03 08 05 04 16 n de las iniciativas del Fond M&E) o para el Medio Ambiente Mundial orientadas por el Ministerio de Ambiente y D esarrollo Sostenible. CO-PNF-223138-CS-INDV / Prestar los servicios profesi onales y apoyo a la gestión Component 4 - Project Coo del Grupo de Comunicacion rdination, Management, M 2021-06-3 2021-03- 2021-07- 2021-03- 2021-07- 2021-05- 2021-08- 2021-06- 2022-08- 2022-06- es del Minambiente, a trav TF / A5789 Posterior Individual Limited 25,705.00 23,367.94 Finalizado onitoring and Evaluation ( 0 03 08 26 23 06 08 02 03 09 és del diseño, producción y M&E) edición de contenidos perio dísticos, piezas gráficas y a udiovisuales, para la divulg ación y difusión de los prog ramas. CO-PNF-223140-CS-INDV / Prestar sus servicios para r ealizar bajo las condicionan Component 3 - Sectoral Pr tes técnicas e instrumentos 2021-06-3 2021-05- 2021-08- 2021-05- 2021-08- 2021-06- 2021-09- 2021-07- 2022-02- 2021-09- TF / A5789 ograms for Sustainable La Posterior Individual Open 33,134.00 29,033.16 Finalizado determinados por la Agenci 0 12 07 18 15 09 05 05 02 13 ndscape Management a Nacional de Tierras, el es tudio y levantamiento topo gráfico de los predios de lo s beneficiarios del pilotaje de acceso a tierras. CO-PNF-204766-CS-INDV / Profesional de apoyo para Component 4 - Project Coo el seguimiento, consolidaci rdination, Management, M 2020-12-3 2021-01- 2021-01- 2021-01- 2021-01- 2021-07- ón y análisis de informació TF / A5789 Posterior Individual Direct 10,746.00 0.00 Cancelado onitoring and Evaluation ( 0 20 09 16 30 29 n de las iniciativas del Fond M&E) o para el Medio Ambiente Mundial orientadas por el Ministerio de Ambiente y D esarrollo Sostenible. CO-PNF-194042-CS-INDV / Prestar sus servicios profes ionales para diseñar, estruc Component 1 - Protected turar y formular el Manual 2020-12-3 2020-11- 2021-01- 2020-12- 2021-01- 2021-02- 2021-06- TF / A5789 Areas Management and Fi Posterior Individual Limited 12,239.00 0.00 Cancelado Operativo del Programa He 0 24 07 15 22 07 07 nancial Sustainability rencia Colombia, que conte nga los arreglos institucion ales, instancias para la tom a de decisiones, herramien tas de gestión CO-PNF-200249-CS-INDV / Realizar bajo las condiciona ntes técnicas e instrument os determinados por la Age Component 3 - Sectoral Pr 2020-12-3 2020-12- 2021-01- 2020-12- 2021-01- 2021-02- 2021-07- ncia Nacional de Tierras, el TF / A5789 ograms for Sustainable La Posterior Individual Limited 33,134.00 0.00 Cancelado 0 03 07 14 22 07 07 estudio y levantamiento to ndscape Management pográfico de los predios de los beneficiarios del pilotaj e de acceso a tierras para el departamento del Guavi are. CO-PNF-223122-CS-INDV / Prestar sus servicios profes ionales para generar linea Component 1 - Protected mientos y recomendacione 2021-06-3 2021-03- 2021-07- 2021-03- 2021-07- 2021-04- 2021-07- 2021-05- 2022-02- 2022-04- TF / A5789 Areas Management and Fi Posterior Individual Direct 20,896.00 18,858.00 Finalizado s para la proyección estrat 0 26 10 26 17 09 31 03 26 18 nancial Sustainability égica del Fondo Patrimonio Natural, en lo relacionado c on el escalamiento de la go bernanza territorial ambien tal a nivel nacional. CO-PNF-223153-CS-INDV / Prestar sus servicios profes ionales para dar soporte, a Component 4 - Project Coo poyar y acompañar la reali rdination, Management, M 2021-06-3 2021-03- 2021-07- 2021-03- 2021-07- 2021-04- 2021-07- 2021-04- 2022-07- 2021-10- TF / A5789 Posterior Individual Direct 18,627.00 16,810.56 Finalizado zación de procesos de adq onitoring and Evaluation ( 0 25 10 25 17 06 31 26 26 04 uisiciones y contrataciones M&E) que se requieran de acuerd o con lo establecido en el A cuerdo Legal de Donación, el Manual Operativo del Pro CO-PNF-223182-CS-INDV / yecto. Prestar sus servicios profes ionales para dar soporte, a Component 4 - Project Coo poyar, acompañar la realiz rdination, Management, M 2021-06-3 2021-03- 2021-07- 2021-03- 2021-07- 2021-04- 2021-07- 2021-04- 2022-07- 2022-09- TF / A5789 Posterior Individual Direct 16,119.00 18,156.29 Finalizado ación de procesos y brindar onitoring and Evaluation ( 0 25 10 25 17 06 31 26 26 08 apoyo jurídico en las adqui M&E) siciones y contrataciones q ue se requieran, de acuerd o con lo establecido en el A cuerdo Legal de Donación, CO-PNF-223128-CS-INDV el MO. / Prestar sus servicios profes ionales para generar linea mientos y recomendacione Component 1 - Protected 2021-06-3 2021-03- 2021-07- 2021-03- 2021-07- 2021-04- 2022-02- 2021-05- 2022-09- 2021-07- s enmarcadas a la proyecci TF / A5789 Areas Management and Fi Posterior Individual Direct 22,985.00 20,530.51 Finalizado 0 25 10 29 17 06 19 07 17 08 ón estratégica del Fondo P nancial Sustainability atrimonio Natural y su cont ribución a la primera fase d el Programa HeCO, en cuan to al desarrollo y aplicación eficiente y efe CO-PNF-223111-CS-INDV / Prestar sus servicios profes ionales para desarrollar e i Component 4 - Project Coo mplementar un pilotaje de l rdination, Management, M 2021-06-3 2021-03- 2021-07- 2021-03- 2021-07- 2021-04- 2021-07- 2021-05- 2021-11- 2021-12- TF / A5789 Posterior Individual Direct 5,970.00 5,388.00 Finalizado a guía de investigación par onitoring and Evaluation ( 0 25 10 29 17 19 31 21 28 10 a la conservación de uso so M&E) stenible del territorio, sigui endo los lineamientos peda gógicos del programa OND AS. CO-PNF-182722-CS-INDV / Profesional que apoye el de sarrollo de la estrategia de Component 1 - Protected 2021-06-3 2021-04- 2021-07- 2021-04- 2021-07- 2021-05- 2021-08- 2021-06- 2022-03- 2022-02- difusión y comunicaciones TF / A5789 Areas Management and Fi Posterior Individual Limited 8,358.00 7,621.04 Finalizado 0 29 08 30 23 20 08 06 06 05 para fortalecer la gobernan nancial Sustainability za local en la jurisdicción d e CDA Guaviare en específi co para la declaratoria de n ueva área protegida. CO-PNF-223137-CS-INDV / Prestar sus servicios profes ionales para diseñar, estruc Component 1 - Protected turar y formular el Manual 2021-06-3 2021-04- 2021-08- 2021-05- 2021-08- 2021-06- 2021-09- 2021-07- 2022-01- 2021-07- TF / A5789 Areas Management and Fi Posterior Individual 12,239.00 10,727.24 Finalizado Operativo del Programa He 0 29 07 14 15 10 05 04 03 06 nancial Sustainability rencia Colombia, que conte nga los arreglos institucion ales, instancias para la tom a de decisiones, herramien tas de gestión. CO-PNF-223141-CS-INDV / Prestar sus servicios profes Component 4 - Project Coo ionales para realizar la pre rdination, Management, M 2021-06-3 2021-04- 2021-07- 2021-05- 2021-08- 2021-05- 2021-09- 2021-06- 2021-12- 2022-01- producción, producción y p TF / B1287 Posterior Individual Open 15,821.00 13,866.92 Finalizado onitoring and Evaluation ( 0 29 31 04 08 24 05 25 04 01 osproducción de una serie M&E) radial con información del GEF 7 en formato waw y m p3 y optimizados para fácil distribución. CO-PNF-230168-CS-INDV / Prestar sus servicios profes ionales para diseñar y desa Component 4 - Project Coo rrollar los contenidos gráfic rdination, Management, M 2021-06-3 2021-04- 2021-07- 2021-04- 2021-07- 2021-05- 2021-07- 2021-06- 2022-07- 2022-05- TF / A5789 Posterior Individual Direct 30,996.00 27,549.77 Finalizado os multiformato requeridos onitoring and Evaluation ( 0 23 10 23 17 25 31 06 11 29 para la implementación de M&E) la estrategia de comunicaci ones y gestión del conocim iento de la iniciativa GEF C orazón de la Amazonia. CO-PNF-230172-CS-INDV / Prestar sus servicios profes ionales para orientar el pro Component 4 - Project Coo ceso de comunicación y ge rdination, Management, M 2021-06-3 2021-04- 2021-07- 2021-04- 2021-07- 2021-05- 2021-07- 2021-06- 2022-07- 2022-05- stión del conocimiento del TF / A5789 Posterior Individual Direct 34,199.00 30,396.65 Finalizado onitoring and Evaluation ( 0 23 10 26 17 25 31 02 11 19 Proyecto GEF Corazón de la M&E) Amazonia que permita posi cionar su implementación c on actores estratégicos, m ostrar y sistematizar avanc es, resultados. CO-PNF-189685-CS-INDV / Prestar servicios profesiona les para apoyar el proceso de formulación del plan de Component 1 - Protected 2021-06-3 2021-07- 2021-07- 2021-08- 2022-08- manejo del Parque Natural TF / A5789 Areas Management and Fi Posterior Individual Limited 21,493.00 0.00 Cancelado 0 08 23 08 03 Regional Miraflores y Picac nancial Sustainability hos y el fortalecimiento de la gobernanza local del áre a protegida, a través de pr ocesos de articulación y ori entación CO-PNF-200255-CS-INDV / Realizar la sustentación téc nica en aspectos biofísicos de la ruta declaratoria de á Component 1 - Protected 2020-12-3 2021-01- 2021-01- 2021-02- 2021-11- rea protegida regional y ap TF / A5789 Areas Management and Fi Posterior Individual Limited 13,433.00 0.00 Cancelado 0 07 22 07 04 oyar el proceso de construc nancial Sustainability ción, validación y concerta ción con actores comunitari os e institucionales en área s priorizadas por la Corpora ción CO-PNF-210816-CS-INDV / Prestar sus servicios profes ionales para apoyar la gen eración y evaluación de AT Component 2 - Forest Gov 2021-03-3 2021-04- 2021-04- 2021-04- 2022-03- D y/o extracción ilícita de TF / A5789 ernance, Management and Posterior Individual Limited 14,776.00 0.00 Cancelado 0 04 11 25 21 minerales a través del proc Monitoring esamiento digital de imáge nes de sensores remotos e n la jurisdicción de CORPO AMAZONIA en conjunto con el IDEAM. CO-PNF-200254-CS-INDV / Prestar sus servicios profes ionales para liderar y orient Component 1 - Protected ar la implementación de la 2021-03-3 2021-04- 2021-04- 2021-05- 2022-03- TF / A5789 Areas Management and Fi Posterior Individual Limited 17,910.00 0.00 Cancelado ruta de declaratoria de un 0 07 22 08 04 nancial Sustainability área protegida regional y la gestión de estrategias com plementarias de conservaci ón, mediante procesos de c onstrucción, validación CO-PNF-230181-CS-INDV / Prestar sus servicios profes ionales para orientar los pr Component 3 - Sectoral Pr ocesos de planificación, ord 2021-06-3 2021-05- 2021-07- 2021-06- 2021-07- 2021-06- 2021-08- 2021-07- 2022-04- 2022-05- TF / A5789 ograms for Sustainable La Posterior Individual Limited 10,746.00 9,433.80 Finalizado enamiento ambiental y ges 0 14 08 10 23 28 08 16 05 01 ndscape Management tión del turismo de natural eza en áreas seleccionadas de la jurisdicción de la Corp oración para el Desarrollo S ostenible del Norte y el Ori CO-PNF-230173-CS-INDV / ente Brindar el soporte jurídico y político que demande la Un Component 4 - Project Coo idad de Coordinación del Pr rdination, Management, M 2021-06-3 2021-04- 2021-07- 2021-04- 2021-07- 2021-05- 2021-08- 2021-05- 2022-08- 2022-05- oyecto para el desarrollo d TF / A5789 Posterior Individual Direct 41,069.00 37,335.08 Finalizado onitoring and Evaluation ( 0 28 10 29 31 07 14 18 09 30 e los componentes del GEF M&E) Corazón Amazonía, para el manejo sostenible del pais aje, especialmente en tem as relacionados con áreas protegidas. CO-PNF-234243-CS-INDV / Prestar servicios profesiona les para orientar la gestión Component 1 - Protected y aumento en la efectivida 2021-06-3 2021-05- 2021-07- 2021-05- 2021-08- 2021-06- 2021-08- 2021-07- 2022-08- 2022-09- TF / A5789 Areas Management and Fi Posterior Individual Open 21,493.00 18,676.80 Finalizado d del manejo del Parque Na 0 12 24 27 01 28 22 17 17 02 nancial Sustainability tural Regional Miraflores y Picachos en el departamen to de Caquetá, a través del fortalecimiento de la gober nanza local del área proteg CO-PNF-237044-CS-INDV / ida. Prestar sus servicios profes ionales como enlace técnic o y jurisdiccional en la Corp Component 2 - Forest Gov 2021-09-3 2021-06- 2021-10- 2021-06- 2021-10- 2021-06- 2021-10- 2021-06- 2022-10- 2022-07- oración para el Desarrollo S TF / A5789 ernance, Management and Posterior Individual Direct 26,078.00 22,849.88 Finalizado 0 09 10 09 17 21 31 25 26 02 ostenible del Norte y el Ori Monitoring ente Amazónico - CDA para el acompañamiento técnico al seguimiento y document ación de los procesos de pl aneación CO-PNF-237047-CS-INDV / Prestar sus servicios profes ionales para consolidar la e Component 4 - Project Coo strategia de gestión de ries rdination, Management, M 2021-09-3 2021-06- 2021-10- 2021-07- 2021-11- 2021-08- 2021-11- 2021-08- 2022-09- 2022-07- gos del proyecto GEF Coraz TF / A5789 Posterior Individual Open 22,388.00 18,905.25 Finalizado onitoring and Evaluation ( 0 18 25 06 01 05 15 31 11 22 ón Amazonia bajo los linea M&E) mientos de Unidad de Coor dinación y de la Coordinaci ón General del Proyecto, e i mpulsar y orientar su imple mentación, e CO-PNF-237075-CS-INDV / Prestar servicios profesiona les con el fin de orientar el Component 1 - Protected proceso de ordenamiento d 2021-09-3 2021-06- 2021-10- 2021-06- 2021-10- 2021-07- 2021-10- 2021-07- 2022-04- 2022-05- TF / A5789 Areas Management and Fi Posterior Individual Direct 13,039.00 16,867.03 Finalizado e la Reserva Forestal de la 0 28 10 29 17 16 31 30 29 10 nancial Sustainability Amazonia en la zona del Ba jo Caguán, departamento d el Caquetá, como estrategi a para identificar alternativ as de comanejo. CO-PNF-239250-CS-INDV / Prestar sus servicios profes ionales para promover la i mplementación de activida Component 3 - Sectoral Pr 2021-09-3 2021-08- 2021-11- 2021-08- 2021-11- 2021-09- 2021-12- 2021-10- 2022-06- 2021-12- des de manejo de las áreas TF / A5789 ograms for Sustainable La Posterior Individual Open 7,164.00 6,245.04 Finalizado 0 02 07 02 15 21 06 08 04 14 de uso sostenible con siste ndscape Management mas de producción no tradi cionales en el sitio Ramsar Estrella Fluvial Inírida en el marco del Proyecto Conser vación. CO-PNF-241450-CS-INDV / Prestar sus servicios profes ionales como especialista e Component 4 - Project Coo n adquisiciones, para la rea rdination, Management, M 2021-07-1 2021-06- 2021-07- 2021-07- 2021-08- 2021-07- 2021-08- 2021-07- 2022-08- 2022-07- TF / A5789 Posterior Individual Direct 37,110.00 35,002.82 Finalizado lización de los procesos de onitoring and Evaluation ( 5 28 25 06 01 07 15 25 15 23 adquisiciones y contratacio M&E) nes que se requieran de ac uerdo con lo establecido en los Acuerdos Legales de Do nación (PPG, AF y nuevo AF CO-PNF-237057-CS-CDS / ). Auditoría de los recursos a dministrados y pagados po Component 4 - Project Coo r Patrimonio Natural y el In Selección direct rdination, Management, M 2021-09-3 2021-07- 2021-11- 2021-09- 2021-11- 2021-10- 2022-02- 2022-02- stituto SINCHI bajo el (TFA5 TF / A5789 Posterior a de consultore Direct 11,940.00 10,658.00 Finalizado onitoring and Evaluation ( 0 22 07 13 22 29 20 06 789) de la financiación adic s M&E) ional y GEF PPG No. TF0B1 287-CO del Proyecto “Cons ervación de Bosques y Sost enibilidad en el Corazón de la Amazonía CO-PNF-242157-CS-INDV / Prestar sus servicios profes ionales para apoyar el desa Component 1 - Protected rrollo y consolidación de cri 2021-09-3 2021-07- 2021-10- 2021-07- 2021-10- 2021-08- 2021-10- 2021-09- 2022-01- 2022-01- TF / A5789 Areas Management and Fi Posterior Individual Direct 4,925.00 4,159.16 Finalizado terios socioeconómicos y a 0 15 10 15 17 09 31 06 29 09 nancial Sustainability nálisis estratégico bajo los l ineamientos técnicos que e stablece el Ministerio de A mbiente y Desarrollo Soste nible. Page 11 CO-PNF-242159-CS-INDV / Prestar sus servicios profes ionales especializados en la Component 3 - Sectoral Pr orientación y ejecución de 2021-09-3 2021-07- 2021-10- 2021-07- 2021-10- 2021-08- 2021-10- 2021-09- 2022-08- 2022-09- TF / A5789 ograms for Sustainable La Posterior Individual Direct 22,601.00 23,033.25 Finalizado acciones programadas por 0 14 10 19 17 05 31 01 27 12 ndscape Management CORPOAMAZONIA para el e stablecimiento y mantenim iento de los acuerdos de co nservación, restauración y no deforestación. CO-PNF-242161-CS-INDV / Prestar sus servicios profes ionales para generar linea mientos y recomendacione Component 1 - Protected 2021-09-3 2021-07- 2021-10- 2021-07- 2021-10- 2021-08- 2021-11- 2021-09- 2022-05- 2022-05- s enmarcadas a la proyecci TF / A5789 Areas Management and Fi Posterior Individual Limited 19,701.00 17,102.58 Finalizado 0 26 08 29 23 12 08 06 07 11 ón estratégica del Fondo P nancial Sustainability atrimonio Natural y su cont ribución a la primera fase d el Programa HeCO, en cuan to al desarrollo y aplicación eficiente CO-PNF-242168-CS-INDV / Prestar sus servicios profes ionales para el análisis de i nstrumentos y mecanismos Component 1 - Protected 2021-09-3 2021-08- 2021-11- 2021-09- 2021-11- 2021-10- 2021-12- 2021-11- 2022-06- 2022-07- financieros enfocado a los TF / A5789 Areas Management and Fi Posterior Individual Open 15,224.00 13,563.96 Finalizado 0 30 07 15 15 29 06 26 04 28 mercados financieros y de nancial Sustainability carbono, y orientado a la s ostenibilidad y escalamient o de la restauración el mar co del Programa Herencia Colombia. CO-PNF-242177-CS-INDV / Generar la propuesta temá tica y técnica para el desar rollo de una solución web i Component 3 - Sectoral Pr 2021-09-3 2021-08- 2021-11- 2021-08- 2021-11- 2021-10- 2021-12- 2021-11- 2022-04- 2022-06- nformática interoperable y TF / A5789 ograms for Sustainable La Posterior Individual Open 6,567.00 5,814.82 Finalizado 0 19 07 24 15 05 06 03 05 30 fortalecer los espacios de i ndscape Management ntercambio de información entre el SIATAC, corporacio nes autónomas y de desarr ollo sostenible y entidades del SINA CO-PNF-242174-CS-INDV / Prestar sus servicios profes ionales para la realización de estudios de mercado de Component 1 - Protected 2021-09-3 2021-08- 2021-11- 2021-09- 2021-11- 2021-10- 2021-12- 2021-11- 2022-06- interés para el diseño de es TF / A5789 Areas Management and Fi Posterior Individual Open 15,224.00 13,534.89 Rescindido 0 30 07 15 15 20 06 22 04 trategias de restauración y nancial Sustainability rehabilitación ecológicas, y para proyectos REDD+ en el marco del Programa Her encia Colombia para el Mos aico Corazón CO-PNF-247131-CS-INDV / Prestar sus servicios profes ionales para generar infor Component 2 - Forest Gov mación y análisis espaciale 2021-09-3 2021-08- 2021-10- 2021-09- 2021-10- 2021-09- 2021-10- 2021-10- 2022-07- 2022-09- TF / A5789 ernance, Management and Posterior Individual Direct 11,623.00 13,474.87 Finalizado s requeridos para la imple 0 25 10 08 17 16 31 14 28 28 Monitoring mentación de los acuerdos de conservación, restauraci ón y no deforestación y el proceso de ruta de declarat oria del área protegida regi CO-PNF-247132-CS-INDV / onal. Prestar sus servicios profes ionales para diseñar, estruc Component 1 - Protected 2021-09-3 2021-08- 2021-11- 2021-09- 2021-11- 2021-10- 2021-12- 2021-11- 2022-04- 2022-06- turar y formular el Manual TF / A5789 Areas Management and Fi Posterior Individual Open 12,239.00 10,836.71 Finalizado 0 30 07 15 15 05 06 05 05 22 Operativo del Programa He nancial Sustainability rencia Colombia, que conte nga los arreglos institucion ales, instancias para la tom a de decisiones. CO-PNF-247133-CS-INDV / Prestar sus servicios profes ionales para la generación Component 4 - Project Coo de alianzas con espacios, c rdination, Management, M 2021-09-3 2021-08- 2021-11- 2021-09- 2021-11- 2021-09- 2021-12- 2021-10- 2022-03- 2022-03- TF / A5789 Posterior Individual Open 6,000.00 5,243.89 Finalizado anales y eventos virtuales onitoring and Evaluation ( 0 30 07 15 15 23 06 25 06 16 de la Amazonia en articulac M&E) ión con la Estrategia de Co municaciones del Proyecto teniendo en cuenta los ava nces. CO-PNF-247134-CS-INDV / Prestar sus servicios profes ionales de apoyo en el proc Component 1 - Protected eso de consolidación de un 2021-09-3 2021-08- 2021-10- 2021-08- 2021-10- 2021-09- 2021-11- 2021-10- 2022-04- 2022-07- TF / A5789 Areas Management and Fi Posterior Individual Limited 6,716.00 8,838.91 Finalizado a propuesta de ordenamien 0 25 08 27 23 08 08 03 07 11 nancial Sustainability to y zonificación para el ma nejo de la Reserva Forestal de la Amazonia creada por la Ley 2 de 1959 en la zona del Bajo Caguán. CO-PNF-247358-CS-INDV / Prestar sus servicios profes ionales para realizar el pro ceso de socialización, segui Component 3 - Sectoral Pr 2021-09-3 2021-08- 2021-10- 2021-10- 2021-10- 2021-11- 2021-11- 2021-12- 2022-08- miento y ajuste de las estr TF / A5789 ograms for Sustainable La Posterior Individual Direct 13,970.00 12,086.57 Firmado 0 25 10 06 17 02 10 14 07 ategias de apoyo al monito ndscape Management reo, control y vigilancia, pa ra los sitios Ramsar Estrella Fluvial Inírida y Complejo d e Humedales Lagos de Tar apoto. CO-PNF-253880-CS-INDV / Prestar sus servicios profes ionales para sistematizar la Component 4 - Project Coo experiencia y documentar l rdination, Management, M 2021-12-3 2021-10- 2022-01- 2021-10- 2022-01- 2021-10- 2022-01- 2021-10- 2022-09- 2022-06- TF / A5789 Posterior Individual Direct 13,595.00 12,623.56 Finalizado a implementación del proy onitoring and Evaluation ( 0 08 09 11 16 15 30 26 27 28 ecto GEF Corazón de la Am M&E) azonia y realizar el seguimi ento a la aplicación de los i nstrumentos de salvaguard as sociales. CO-PNF-253881-CS-INDV / Prestar sus servicios profes ionales para realizar el cont Component 2 - Forest Gov 2021-12-3 2021-10- 2022-01- 2021-10- 2022-01- 2021-10- 2022-01- 2021-10- 2022-09- 2022-06- rol de calidad y realizar el a TF / A5789 ernance, Management and Posterior Individual Direct 18,514.00 17,197.27 Finalizado 0 08 09 13 16 20 30 31 27 28 compañamiento técnico pa Monitoring ra la implementación de pr otocolos y metodologías de sarrolladas por el SMByC CO-PNF-253883-CS-INDV / Prestar sus servicios profes ionales para implementar e l mecanismo de interopera Component 2 - Forest Gov 2021-12-3 2022-03- 2022-01- 2022-05- 2022-02- 2022-05- 2022-02- 2022-05- 2022-09- 2022-12- bilidad que responda a los TF / A5789 ernance, Management and Posterior Individual Open 13,000.00 11,495.58 Finalizado 0 17 30 02 07 02 28 24 26 18 requerimientos de seguimi Monitoring ento del estado de los recu rsos naturales de la Amazo nia colombiana entre el Sis tema de información Ambie ntal Territorial CO-PNF-255209-CS-INDV / Prestar sus servicios para r ealizar bajo las condicionan Component 3 - Sectoral Pr tes técnicas e instrumentos 2021-12-3 2021-10- 2022-01- 2021-10- 2022-01- 2021-11- 2022-01- 2021-11- 2022-05- 2022-07- TF / A5789 ograms for Sustainable La Posterior Individual Direct 33,756.00 30,469.60 Finalizado determinados por la Agenci 0 21 09 26 16 09 30 30 30 02 ndscape Management a Nacional de Tierras, el es tudio y levantamiento topo gráfico de los predios de lo s beneficiarios del pilotaje de acceso a tierras. CO-PNF-261626-CS-INDV / Prestar sus servicios profes ionales para adelantar el di Component 1 - Protected agnóstico técnico y el diseñ 2021-12-3 2021-12- 2022-01- 2022-01- 2022-02- 2022-01- 2022-02- 2022-02- 2022-03- 2022-03- TF / A5789 Areas Management and Fi Posterior Individual Open 833.00 756.15 Finalizado o especializado del sistema 0 15 30 14 07 14 28 19 30 06 nancial Sustainability eléctrico e infraestructura de red de voz y datos de la sede administrativa del PN N Alto Fragua Indi Wasi. CO-PNF-261628-CS-INDV / Prestar sus servicios profes ionales para apoyar a la Co Component 4 - Project Coo ordinación General del Proy rdination, Management, M 2021-12-3 2021-11- 2022-01- 2021-11- 2022-01- 2021-12- 2022-01- 2021-12- 2022-12- 2022-11- ecto “Conservación e Bosq TF / A5789 Posterior Individual Direct 29,744.00 26,997.68 Finalizado onitoring and Evaluation ( 0 17 09 18 16 03 30 25 26 21 ues y Sostenibilidad en el C M&E) orazón de la Amazonía”, en el seguimiento y document ación de los procesos de pr ogramación, ejecución y ev aluación. CO-PNF-261629-CS-INDV / Prestar sus servicios profes ionales en el análisis y gen Component 3 - Sectoral Pr eración de información cart 2021-12-3 2021-11- 2022-01- 2021-11- 2022-01- 2021-12- 2022-01- 2022-01- 2022-06- 2022-06- TF / A5789 ograms for Sustainable La Posterior Individual Direct 9,100.00 8,151.67 Finalizado ografía y análisis de datos 0 17 09 23 16 15 30 01 29 13 ndscape Management espaciales requeridos en la implementación del proyec to de GEF Conservación de Bosques y Sostenibilidad e n el Corazón de la Amazoni CO-PNF-261631-CS-INDV / a. Prestar los servicios profesi onales para orientar los pro Component 3 - Sectoral Pr cesos de planeación, técnic 2021-12-3 2021-11- 2022-01- 2021-11- 2022-01- 2021-12- 2022-01- 2022-01- 2022-06- 2022-06- TF / A5789 ograms for Sustainable La Posterior Individual Direct 18,056.00 16,173.95 Finalizado os y operativos para la final 0 17 09 19 16 15 30 02 29 12 ndscape Management ización del pilotaje de Cont ratos de Uso en los departa mentos de Caquetá y Guav iare, en el marco del Conve nio No 1268. CO-PNF-268539-CS-INDV / Prestar sus servicios profes ionales para orientar y lider Component 1 - Protected ar la gestión de los proceso 2021-12-3 2021-12- 2022-01- 2022-01- 2022-01- 2022-02- 2022-01- 2022-02- 2022-08- 2023-02- TF / A5789 Areas Management and Fi Posterior Individual Direct 12,028.00 18,096.28 Finalizado s de concertación y fortalec 0 22 09 05 16 03 30 18 28 13 nancial Sustainability imiento de capacidades co n las comunidades y organi zaciones sociales para el d esarrollo de la ruta de decl aratoria de un área protegi CO-PNF-268541-CS-INDV / da Prestar los servicios profesi onales para realizar la Coor Component 4 - Project Coo dinación General del Proye rdination, Management, M 2021-12-3 2021-12- 2022-01- 2022-01- 2022-01- 2022-01- 2022-01- 2022-01- 2022-07- 2022-12- cto “Conservación de Bosq TF / A5789 Posterior Individual Direct 26,667.00 46,156.80 Finalizado onitoring and Evaluation ( 0 23 09 04 16 05 30 28 29 31 ues y Sostenibilidad en el C M&E) orazón de la Amazonia”, ta nto de los aspectos técnico s, operativos, administrativ os, como de seguimiento & monitoreo. CO-PNF-268544-CS-INDV / Prestar sus servicios profes ionales para orientar a las Component 4 - Project Coo entidades socias en los pro rdination, Management, M 2021-12-3 2021-12- 2022-01- 2022-01- 2022-01- 2022-01- 2022-01- 2022-01- 2022-07- 2022-12- TF / A5789 Posterior Individual Direct 20,000.00 34,617.60 Finalizado cedimientos financieros y fi onitoring and Evaluation ( 0 22 09 03 16 05 30 28 29 31 duciarios de conformidad c M&E) on las directrices financiera s del Banco Mundial y proc edimientos de Patrimonio N atural. CO-PNF-268545-CS-INDV / Prestar sus servicios profes ionales como enlace region Component 4 - Project Coo al para apoyar a la coordin rdination, Management, M 2022-03-3 2021-12- 2022-04- 2022-01- 2022-04- 2022-01- 2022-04- 2022-02- 2022-10- 2023-01- ación general del proyecto TF / A5789 Posterior Individual Direct 14,167.00 17,048.96 Finalizado onitoring and Evaluation ( 0 22 09 12 16 20 30 18 27 05 “Conservación y Sostenibili M&E) dad de Bosques en el Cora zón de la Amazonia” en fac ilitar la gestión territorial, e l seguimiento a la planeaci ón técnica CO-PNF-268548-CS-INDV / Prestar sus servicios profes ionales apoyando a la coor Component 4 - Project Coo dinación general del proyec rdination, Management, M 2022-03-3 2021-12- 2022-04- 2022-01- 2022-04- 2022-01- 2022-04- 2022-01- 2022-10- 2022-08- TF / A5789 Posterior Individual Direct 15,000.00 13,608.54 Firmado to “Conservación y Sosteni onitoring and Evaluation ( 0 22 09 05 16 14 30 27 27 01 bilidad de Bosques en el Co M&E) razón de la Amazonia” com o gestora territorial que fac ilite la interlocución con ent idades socias. CO-PNF-268550-CS-INDV / Prestar sus servicios profes ionales en la asistencia téc Component 4 - Project Coo nica y elaboración de los di rdination, Management, M 2022-03-3 2021-12- 2022-04- 2022-01- 2022-04- 2022-01- 2022-04- 2022-01- 2022-10- 2022-12- TF / A5789 Posterior Individual Direct 8,667.00 14,695.02 Finalizado ferentes documentos técni onitoring and Evaluation ( 0 22 09 04 16 06 30 12 27 31 cos que soportan los proce M&E) sos de adquisiciones y cont rataciones, de acuerdo con los procedimientos requeri dos por el proyecto. CO-PNF-268555-CS-INDV / Prestar sus servicios profes ionales para liderar y conso Component 2 - Forest Gov lidar los resultados temátic 2022-03-3 2021-12- 2022-04- 2022-01- 2022-04- 2022-01- 2022-04- 2022-02- 2023-04- 2023-01- TF / A5789 ernance, Management and Posterior Individual Direct 38,133.00 34,368.05 Rescindido os del proceso de generaci 0 22 09 13 16 20 30 13 25 05 Monitoring ón de cifras oficiales de mo nitoreo de la superficie de bosque, la deforestación y/ o la degradación forestal a nivel nacional y/o regional. CO-PNF-268560-CS-INDV / Prestar sus servicios profes ionales (PDI1) para generar información temática de m Component 2 - Forest Gov 2022-03-3 2021-12- 2022-04- 2022-01- 2022-04- 2022-01- 2022-04- 2022-02- 2023-04- 2023-01- onitoreo de la superficie de TF / A5789 ernance, Management and Posterior Individual Direct 22,256.00 20,156.19 Finalizado 0 22 09 11 16 21 30 05 25 04 bosque, la deforestación y Monitoring alertas tempranas de defor estación como insumo para la consolidación de cifras of iciales a nivel nacional y/o r egional CO-PNF-268561-CS-INDV / Prestar sus servicios profes ionales (PDI2) para generar información temática de m Component 2 - Forest Gov 2022-03-3 2021-12- 2022-04- 2022-01- 2022-04- 2022-01- 2022-04- 2022-02- 2023-04- 2023-01- onitoreo de la superficie de TF / A5789 ernance, Management and Posterior Individual Direct 22,256.00 20,058.44 Rescindido 0 22 09 11 16 20 30 07 25 05 bosque, la deforestación y Monitoring alertas tempranas de defor estación como insumo para la consolidación de cifras of iciales a nivel nacional y/o r egional CO-PNF-268568-CS-INDV / Prestar sus servicios profes ionales para generar infor Component 2 - Forest Gov mación temática de monito 2022-03-3 2021-12- 2022-04- 2022-01- 2022-04- 2022-01- 2022-04- 2022-02- 2023-04- TF / A5789 ernance, Management and Posterior Individual Direct 20,800.00 18,746.21 Rescindido reo de la superficie de bosq 0 22 09 12 16 20 30 07 25 Monitoring ue, la deforestación y mine ría ilegal como insumo par a la consolidación de cifras oficiales a nivel regional en áreas de interés de la Direc CO-PNF-268570-CS-INDV / ción. Prestar sus servicios profes ionales para realizar las act ividades administrativas, fi Component 2 - Forest Gov 2022-03-3 2021-12- 2022-04- 2022-01- 2022-04- 2022-01- 2022-04- 2022-02- 2023-04- 2023-01- nancieras y de planeación TF / A5789 ernance, Management and Posterior Individual Direct 24,267.00 21,870.58 Finalizado 0 22 09 11 16 20 30 05 25 03 para el Sistema de Monitor Monitoring eo de Bosques y Carbono e n Colombia SMByC y la Sub dirección de Ecosistemas e Información Ambiental (SEI A) del IDEAM. CO-PNF-268571-CS-INDV / Prestar sus servicios profes ionales para orientar técnic Component 1 - Protected amente y facilitar la articul 2022-03-3 2021-12- 2022-04- 2022-01- 2022-04- 2022-01- 2022-04- 2022-02- 2022-10- 2023-02- TF / A5789 Areas Management and Fi Posterior Individual Direct 15,937.00 27,378.49 Finalizado ación y complementarieda 0 22 09 06 16 20 30 17 27 09 nancial Sustainability d de acciones entre los niv eles local (6 áreas protegid as priorizadas), regional y nacional de PNN, con otras entidades socias CO-PNF-242166-CS-INDV / Prestar sus servicios profes ionales para realizar el anál Component 1 - Protected isis, actualización y genera 2021-09-3 2021-07- 2021-11- 2021-11- 2021-12- 2022-09- TF / A5789 Areas Management and Fi Posterior Individual Open 21,493.00 0.00 Cancelado ción de información geoesp 0 14 07 15 06 02 nancial Sustainability acial para los corredores y mosaicos del Programa Her encia Colombia con especi al referencia al Corredor M acarena-Chiribiquete. CO-PNF-242162-CS-INDV / Prestar sus servicios profes ionales para orientar la imp Component 1 - Protected lementación de acciones d 2021-09-3 2021-07- 2021-10- 2021-11- 2021-11- 2022-08- TF / A5789 Areas Management and Fi Posterior Individual Open 22,836.00 0.00 Cancelado e seguimiento, monitoreo, 0 14 24 01 22 19 nancial Sustainability sostenibilidad financiera y operación técnica en el Mo saico Corazón de la Amazo nía y el corredor de conser vación “Macarena-Chiribiqu CO-PNF-242171-CS-INDV / ete”. Prestar los servicios profesi onales para apoyar el segui Component 1 - Protected miento y monitoreo del Pla 2021-09-3 2021-07- 2021-11- 2021-11- 2021-12- 2022-09- TF / A5789 Areas Management and Fi Posterior Individual Open 22,836.00 0.00 Cancelado n de Conservación del Prog 0 28 07 15 06 02 nancial Sustainability rama Herencia Colombia, c on énfasis en el Mosaico Co razón de la Amazonía y el c orredor de conservación “M acarena-Chiribiquete”. CO-PNF-268572-CS-INDV / Prestar sus servicios profes ionales para liderar la plan Component 1 - Protected eación, seguimiento, ejecu 2022-03-3 2021-12- 2022-04- 2022-01- 2022-04- 2022-02- 2022-04- 2022-02- 2022-10- 2022-08- TF / A5789 Areas Management and Fi Posterior Individual Direct 10,815.00 9,918.05 Finalizado ción y evaluación operativa 0 22 09 21 16 02 30 28 27 25 nancial Sustainability , financiera y técnica de los planes de trabajo, convenid os con los resguardos colin dantes al Parque Nacional Serranía de Chiribiquete. CO-PNF-268554-CS-INDV / Prestar sus servicios profes ionales para dar soporte, a Component 4 - Project Coo poyar y acompañar la reali rdination, Management, M 2022-03-3 2021-12- 2022-04- 2021-12- 2022-04- 2021-12- 2022-04- 2022-01- 2022-10- 2022-03- zación de procesos de adq TF / A5789 Posterior Individual Direct 7,500.00 6,805.35 Finalizado onitoring and Evaluation ( 0 22 09 23 16 27 30 20 27 29 uisiciones y contrataciones M&E) que se requieran de acuerd o con lo establecido en los Acuerdos Legales de Donac ión (AF y nuevo AF), el Man ual Operativo. CO-PNF-268559-CS-INDV / Prestar sus servicios profes ionales para el diseño, impl ementación y validación de Component 2 - Forest Gov 2022-03-3 2021-12- 2022-04- 2022-01- 2022-04- 2022-01- 2022-04- 2022-02- 2023-04- l componente de Control d TF / A5789 ernance, Management and Posterior Individual Direct 31,200.00 28,119.31 Rescindido 0 22 09 12 16 20 30 16 25 e Calidad en lo referente al Monitoring componente de Procesami ento Digital de Imágenes d e satélite para la generació n de cifras oficiales de mon itoreo. CO-PNF-268574-CS-INDV / Prestar sus servicios profes ionales para orientar las ac Component 3 - Sectoral Pr 2022-03-3 2021-12- 2022-04- 2022-01- 2022-04- 2022-01- 2022-04- 2022-02- 2022-10- 2023-01- tividades de establecimient TF / A5789 ograms for Sustainable La Posterior Individual Direct 10,310.00 17,751.91 Finalizado 0 22 09 04 16 14 30 16 27 27 o, seguimiento y evaluació ndscape Management n de los acuerdos de conse rvación, restauración y no deforestación, en las áreas priorizadas por la CDA. CO-PNF-276320-CS-INDV / Prestar sus servicios profes ionales para realizar la gest Component 4 - Project Coo ión que facilite la incorpora rdination, Management, M 2022-03-3 2022-02- 2022-04- 2022-02- 2022-04- 2022-02- 2022-05- 2022-03- 2022-10- 2022-09- TF / A5789 Posterior Individual Direct 15,310.00 14,085.54 Finalizado ción de lineamientos técnic onitoring and Evaluation ( 0 16 09 18 16 24 03 17 30 14 os y normativos en materia M&E) de infraestructura de trans porte bajo la orientación de l Ministerio de Ambiente y Desarrollo Sostenible. CO-PNF-276334-CS-INDV / Prestar sus servicios profes ionales para el apoyo en la Component 3 - Sectoral Pr orientación técnica y el seg 2022-03-3 2022-04- 2022-04- 2022-05- 2022-05- 2022-05- 2022-05- 2022-06- 2022-11- 2023-03- TF / A5789 ograms for Sustainable La Posterior Individual Open 8,333.00 7,299.30 Finalizado uimiento a las líneas estrat 0 07 28 13 05 13 22 16 18 12 ndscape Management égicas en el desarrollo de l as actividades del plan de manejo para los sitios Ram sar Estrella Fluvial Inírida ( EFI) y Complejo de Humeda les. Page 12 CO-PNF-285591-CS-INDV / Prestar sus servicios profes ionales para dar soporte, a Component 4 - Project Coo poyar y acompañar la reali rdination, Management, M 2022-06-3 2022-03- 2022-07- 2022-04- 2022-07- 2022-04- 2022-08- 2022-05- 2023-02- 2023-04- zación de procesos de adq TF / A5789 Posterior Individual Direct 10,000.00 9,594.72 Finalizado onitoring and Evaluation ( 0 25 10 01 17 07 07 11 03 20 uisiciones y contrataciones M&E) que se requieran de acuerd o con lo establecido en los Acuerdos Legales de Donac ión (AF y nuevo AF), el Man ual Operativo CO-PNF-285595-CS-INDV / Prestar sus servicios profes ionales para realizar el aco mpañamiento y apoyo técn Component 3 - Sectoral Pr 2022-06-3 2022-03- 2022-07- 2022-03- 2022-07- 2022-04- 2022-07- 2022-05- 2023-06- 2023-04- ico a las comunidades del S TF / A5789 ograms for Sustainable La Posterior Individual Direct 12,222.00 11,711.48 Finalizado 0 25 10 29 17 11 31 08 26 20 itio Ramsar Estrella Fluvial ndscape Management de Inírida para la generació n de datos de uso y disponi bilidad de las especies de f auna seleccionadas para el monitoreo CO-PNF-297004-CS-INDV / Prestar sus servicios perso nales técnicos para apoyar Component 1 - Protected el desarrollo de la estrategi 2022-09-3 2022-06- 2022-10- 2022-07- 2022-11- 2022-07- 2022-11- 2022-08- 2023-04- 2023-01- TF / A5789 Areas Management and Fi Posterior Individual Open 3,472.00 2,869.63 Finalizado a de comunicaciones y dise 0 15 26 21 02 21 19 05 18 01 nancial Sustainability ño de contenidos de divulg ación que permitan fortalec er la gobernanza local en la declaratoria del área prote gida de carácter regional. CO-PNF-297005-CS-INDV / Prestar sus servicios profes ionales para promover y ac Component 4 - Project Coo ompañar la gestión interins rdination, Management, M 2022-07-3 2022-06- 2022-08- 2022-06- 2022-08- 2022-07- 2022-09- 2022-08- 2023-03- TF / A5789 Posterior Individual Direct 18,000.00 14,512.61 Rescindido titucional, la toma de decisi onitoring and Evaluation ( 0 15 15 30 22 25 08 11 07 ones sectoriales y territoria M&E) les y la adopción de acuerd os, criterios y herramientas de planeación y gestión am biental sostenible. CO-PNF-297006-CS-INDV / Prestar servicios profesiona les para liderar la declarato Component 1 - Protected ria del área protegida regio 2022-09-3 2022-06- 2022-10- 2022-07- 2022-11- 2022-07- 2022-11- 2022-08- 2023-05- 2023-08- TF / A5789 Areas Management and Fi Posterior Individual Open 17,167.00 14,138.60 Finalizado nal y la gestión otras categ 0 15 26 29 02 29 19 19 18 17 nancial Sustainability orías de conservación del S INAP priorizadas por la Cor poración para el Desarrollo Sostenible del Norte y el Or iente Amazónico CDA. CO-PNF-297009-CS-INDV / Prestar sus servicios profes ionales como especialista e Component 1 - Protected n adquisiciones, para la rea 2022-07-3 2022-06- 2022-08- 2022-07- 2022-08- 2022-07- 2022-09- 2022-07- 2022-12- 2022-12- TF / A5789 Areas Management and Fi Posterior Individual Direct 10,000.00 8,411.04 Finalizado lización de los procesos de 0 15 12 01 19 06 05 18 04 30 nancial Sustainability adquisiciones y contratacio nes que se requieran de ac uerdo con lo establecido en los Acuerdos Legales de Do nación (AF y nuevo AF). CO-PNF-297010-CS-INDV / Prestar sus servicios técnic os y jurídicos profesionales para la implementación y e Component 1 - Protected 2022-07-3 2022-06- 2022-08- 2022-07- 2022-08- 2022-07- 2022-09- 2022-07- 2022-12- 2023-03- jecución de procesos, brind TF / A5789 Areas Management and Fi Posterior Individual Direct 3,750.00 2,948.27 Finalizado 0 15 09 07 16 12 02 27 01 07 ar apoyo jurídico en las adq nancial Sustainability uisiciones y contrataciones que se requieran, de acuer do con lo establecido en los Acuerdos Legales de Donac ión. CO-PNF-297013-CS-INDV / Prestar servicios profesiona les para desarrollar en área Component 3 - Sectoral Pr s seleccionadas de la jurisd 2022-07-3 2022-06- 2022-08- 2022-06- 2022-08- 2022-06- 2022-09- 2022-07- 2023-05- 2023-04- TF / A5789 ograms for Sustainable La Posterior Individual Direct 11,700.00 10,475.67 Finalizado icción de la Corporación pa 0 15 09 16 16 23 02 11 30 04 ndscape Management ra el Desarrollo Sostenible del Norte y el Oriente Amaz ónico – CDA, los procesos d e ordenamiento y gestión d el turismo de naturaleza. CO-PNF-298278-CS-INDV / Prestar sus servicios profes ionales para orientar y des Component 4 - Project Coo arrollar gráficamente la im rdination, Management, M 2022-07-3 2022-06- 2022-08- 2022-06- 2022-08- 2022-06- 2022-09- 2022-07- 2023-03- 2023-01- TF / A5789 Posterior Individual Direct 15,000.00 13,183.56 Finalizado plementación de la estrate onitoring and Evaluation ( 0 15 09 17 16 29 05 23 04 24 gia de comunicaciones y g M&E) estión del conocimiento de la Iniciativa GEF Corazón d e la Amazonia, a partir del diseño y diagramación. CO-PNF-298281-CS-INDV / Prestar sus servicios profes ionales para orientar y hac Component 1 - Protected 2022-07-3 2022-06- 2022-08- 2022-06- 2022-08- 2022-07- 2022-09- 2022-08- 2022-12- 2022-12- er seguimiento a la aplicaci TF / A5789 Areas Management and Fi Posterior Individual Direct 5,303.00 4,169.50 Finalizado 0 15 09 29 16 12 02 13 01 31 ón de los instrumentos de s nancial Sustainability alvaguardas sociales del pr oyecto GEF Corazón de la A mazonia con su respectivo proceso documental. CO-PNF-298283-CS-INDV / Brindar el soporte jurídico y político que demande la Un Component 4 - Project Coo idad de Coordinación del Pr rdination, Management, M 2022-09-3 2022-06- 2022-10- 2022-06- 2022-10- 2022-07- 2022-11- 2022-08- 2023-05- oyecto para el desarrollo d TF / A5789 Posterior Individual Direct 19,873.00 16,277.86 Rescindido onitoring and Evaluation ( 0 15 10 22 17 08 03 16 02 e los componentes del GEF M&E) Corazón Amazonía, para el manejo sostenible del pais aje, especialmente en tem as relacionados con áreas protegidas. CO-PNF-298284-CS-INDV / Prestar los servicios profesi Component 4 - Project Coo onales y de apoyo a la gest rdination, Management, M 2022-09-3 2022-06- 2022-10- 2022-06- 2022-10- 2022-07- 2022-11- 2022-08- 2023-04- 2023-01- ión del Grupo de Comunica TF / A5789 Posterior Individual Direct 10,364.00 8,559.29 Finalizado onitoring and Evaluation ( 0 15 10 24 17 18 03 18 02 02 ciones del Minambiente, a t M&E) ravés de la creación, produ cción y edición de contenid os periodísticos, piezas grá ficas y audiovisuales. CO-PNF-298285-CS-INDV / Prestar servicios profesiona les como enlace técnico y j urisdiccional en la Corporac Component 3 - Sectoral Pr 2022-09-3 2022-06- 2022-10- 2022-07- 2022-10- 2022-07- 2022-11- 2022-08- 2023-08- 2023-11- ión para el Desarrollo Soste TF / A5789 ograms for Sustainable La Posterior Individual Direct 21,033.00 17,323.22 Finalizado 0 15 10 12 17 29 03 10 30 11 nible del Norte y el Oriente ndscape Management Amazónico - CDA para la ej ecución de las líneas de ac ción que tiene a cargo la C orporación en el marco del proyecto CO-PNF-298286-CS-INDV / Prestar sus servicios profes ionales dirigidos a asesorar Component 1 - Protected y liderar jurídicamente las 2022-09-3 2022-06- 2022-10- 2022-07- 2022-11- 2022-07- 2022-11- 2022-07- 2023-11- TF / A5789 Areas Management and Fi Posterior Individual Limited 40,000.00 33,058.08 Rescindido condiciones de cierre del Pr 0 15 18 01 02 21 19 27 14 nancial Sustainability ograma de Financiamiento para la Permanencia deno minado PFP, las condicione s de desembolso de GEF 7 HeCo CO-PNF-298669-CS-INDV / Asesorar al Ministerio de A mbiente y Desarrollo Soste Component 4 - Project Coo nible en la consolidación de rdination, Management, M 2022-09-3 2022-06- 2022-10- 2022-06- 2022-10- 2022-06- 2022-11- 2022-07- 2023-06- 2023-02- TF / A5789 Posterior Individual Direct 23,333.00 21,549.36 Finalizado la posición del Sistema Nac onitoring and Evaluation ( 0 10 10 10 17 17 03 20 01 18 ional Ambiental (SINA) en l M&E) as negociaciones del marco global post 2020 para la bi odiversidad del Convenio d e Diversidad Biológica (CD CO-PNF-302411-CS-INDV / B). Prestar sus servicios profes ionales para realizar el pro Component 1 - Protected ceso de concertación social 2022-09-3 2022-06- 2022-10- 2022-07- 2022-10- 2022-07- 2022-10- 2022-08- 2023-01- 2022-11- TF / A5789 Areas Management and Fi Posterior Individual Direct 6,310.00 5,087.48 Finalizado e identificación de usuarios 0 30 10 05 17 25 31 10 29 04 nancial Sustainability en áreas prioritarias estrat égicas que podrían ser obje to de acuerdos de conserva ción, en la Zona Reserva Fo restal de la Amazonia y áre CO-PNF-302412-CS-INDV / as. Prestar sus servicios profes ionales como especialista e n comunicaciones y gestión Component 1 - Protected 2022-09-3 2022-06- 2022-10- 2022-07- 2022-10- 2022-08- 2022-11- 2022-08- 2023-05- 2023-02- del conocimiento del Proye TF / A5789 Areas Management and Fi Posterior Individual Direct 16,548.00 13,896.23 Finalizado 0 30 10 12 17 01 03 21 02 18 cto GEF Corazón de la Ama nancial Sustainability zonia para que oriente y de sarrolle la estrategia de inf ormación, divulgación y co municación del proyecto a nivel nacional CO-PNF-307340-CS-INDV / Prestar sus servicios profes ionales como enlace territo Component 1 - Protected rial y de seguimiento en ap 2022-09-3 2022-08- 2022-10- 2022-08- 2022-10- 2022-08- 2022-10- 2022-09- 2022-12- 2023-02- TF / A5789 Areas Management and Fi Posterior Individual Direct - National 5,000.00 4,095.18 Finalizado oyo a la Coordinación Gene 0 08 10 16 17 26 31 24 30 15 nancial Sustainability ral del Proyecto “Conserva ción y Sostenibilidad de Bo sques en el Corazón de la A mazonia” realizando el mo nitoreo, evaluación. CO-PNF-307341-CS-INDV / Prestar sus servicios profes ionales para apoyar al Mini Component 4 - Project Coo sterio de Ambiente y Desar rdination, Management, M 2022-09-3 2022-08- 2022-10- 2022-08- 2022-10- 2022-08- 2022-10- 2022-09- 2023-04- 2023-03- rollo Sostenible en la imple TF / A5789 Posterior Individual Direct - National 6,667.00 5,453.28 Finalizado onitoring and Evaluation ( 0 05 10 09 17 29 31 19 29 13 mentación del proceso de a M&E) rmonización de las iniciativ as y proyectos del Fondo p ara el Medio Ambiente Mun dial – GEF y el Fondo Verde del Clima CO-PNF-307367-CS-INDV / Prestar sus servicios profes ionales para orientar la pla Component 1 - Protected nificación, concertación, im 2022-12-3 2022-08- 2023-01- 2022-08- 2023-01- 2022-08- 2023-01- 2022-09- 2023-11- TF / B5182 Areas Management and Fi Posterior Individual Direct - National 14,333.00 11,727.13 Rescindido plementación y seguimient 0 05 09 12 14 23 31 24 27 nancial Sustainability o de actividades de Restau ración en la RNN NUKAK, e n el marco del proyecto GE F Corazón de la Amazonia F A2. CO-PNF-307369-CS-INDV / Prestar sus servicios profes ionales para recopilar, orga Component 1 - Protected nizar, analizar y generar inf 2022-12-3 2022-08- 2023-01- 2022-10- 2023-02- 2022-10- 2023-02- 2022-11- 2023-08- 2023-05- TF / B5182 Areas Management and Fi Posterior Individual Open - National 9,500.00 0.00 Finalizado ormación geográfica y doc 0 05 30 25 07 25 28 10 27 14 nancial Sustainability umental del Parque Nacion al Natural Alto Fragua Indi Wasi como insumo para la gestión, manejo y monitore o del área protegida. CO-PNF-307372-CS-INDV / Prestar sus servicios profes ionales para apoyar a la Co rporación para el Desarroll Component 3 - Sectoral Pr 2022-12-3 2022-08- 2023-01- 2022-08- 2023-01- 2022-08- 2023-01- 2022-09- 2024-01- 2023-09- o Sostenible del Norte y Ori TF / B5182 ograms for Sustainable La Posterior Individual Direct - National 20,221.00 16,582.89 Finalizado 0 05 09 09 16 19 30 14 25 04 ente Amazónico – CDA, en l ndscape Management a generación de insumos, s oportes y conceptos técnic os para la toma de decision es en relación con la gestió n ambiental CO-PNF-307374-CS-INDV / Prestar sus servicios profes ionales para orientar técnic Component 2 - Forest Gov amente los procesos de art 2022-12-3 2022-08- 2023-01- 2022-08- 2023-01- 2022-09- 2023-01- 2022-09- 2024-01- TF / B5182 ernance, Management and Posterior Individual Direct - National 31,667.00 0.00 Rescindido iculación institucional y con 0 08 09 24 16 16 30 28 25 Monitoring certación social requeridos para la aplicación de prácti cas de manejo sostenible d el paisaje y de restauración en las áreas terrestres. CO-PNF-307338-CS-INDV / Prestar sus servicios profes ionales para orientar la imp lementación de la Estrategi Component 1 - Protected 2022-09-3 2022-08- 2022-10- 2022-08- 2022-10- 2022-08- 2022-10- 2022-08- 2023-04- 2023-09- a de Prevención y Gestión TF / A5789 Areas Management and Fi Posterior Individual Direct - National 13,375.00 11,048.50 Finalizado 0 08 10 12 17 24 31 30 29 01 de riesgo de vulneraciones nancial Sustainability a los Derechos Humanos e infracciones al Derecho Int ernacional Humanitario del Proyecto GEF- Corazón de l a Amazonía. CO-PNF-316052-CS-INDV / Prestar sus servicios técnic os para el fortalecimiento d Component 3 - Sectoral Pr e iniciativas en el aprovech 2022-12-1 2022-09- 2023-01- 2022-10- 2023-01- 2022-10- 2023-02- 2022-11- 2023-10- 2023-07- TF / A5789 ograms for Sustainable La Posterior Individual Open - National 5,977.58 0.00 Finalizado amiento y procesamiento d 9 20 19 24 27 24 13 09 11 10 ndscape Management e alimentos a productores, mediante transferencia tec nológica y desarrollo agroin dustrial para contribuir al manejo sostenible. CO-PNF-316603-CS-INDV / Prestar servicios profesiona les para gestionar, suscribir Component 3 - Sectoral Pr y hacer seguimiento a acue 2022-12-1 2022-10- 2022-12- 2022-10- 2023-01- 2022-10- 2023-01- 2022-11- 2024-01- TF / B5182 ograms for Sustainable La Posterior Individual Direct - National 27,455.22 0.00 Rescindido rdos sectoriales entre autor 9 10 29 14 05 26 19 04 14 ndscape Management idades ambientales regiona les y entidades territoriales (alcaldías y gobernaciones) , para propiciar el uso de in formación. CO-PNF-319313-CS-INDV / Prestar servicios profesiona les para realizar la caracter Component 1 - Protected ización biofísica y generar l 2022-12-1 2023-09- 2023-01- 2023-10- 2023-01- 2023-10- 2023-02- 2023-10- 2023-06- 2024-05- TF / A5789 Areas Management and Fi Posterior Individual Open - National 5,977.58 0.00 Finalizado os insumos necesarios para 4 14 16 13 24 13 14 30 14 06 nancial Sustainability el análisis de conectividad y fragmentación en el corre dor de conectividad del mu nicipio de San José de Guav iare. CO-PNF-319314-CS-INDV / Prestar servicios profesiona les para realizar la caracter Component 1 - Protected ización socioeconómica de 2022-12-1 2023-05- 2023-01- 2023-06- 2023-01- 2023-06- 2023-02- 2023-07- 2023-05- 2024-05- TF / A5789 Areas Management and Fi Posterior Individual Open - National 4,483.19 0.00 Finalizado los agentes, causas directa 4 16 16 26 24 26 14 17 15 20 nancial Sustainability s y subyacentes en relació n a la fragmentación, en el corredor de conectividad d el municipio de San José de Guaviare. CO-PNF-319315-CS-INDV / Prestar servicios profesiona les para realizar la caracter Component 1 - Protected ización edafológica de las u 2022-12-1 2023-09- 2023-01- 2023-11- 2023-01- 2023-11- 2023-02- 2023-11- 2023-06- 2024-05- TF / A5789 Areas Management and Fi Posterior Individual Open - National 5,977.58 0.00 Finalizado nidades ecológicas en cuan 4 14 16 17 24 17 14 28 14 31 nancial Sustainability to al uso del suelo, estabili dad, compactación y degra dación en el corredor de co nectividad del municipio de San José de Guaviare. CO-PNF-319316-CS-INDV / Prestar servicios profesiona les para apoyar a Corpoam azonia, territorial Caquetá, Component 3 - Sectoral Pr 2022-12-1 2022-10- 2023-01- 2022-11- 2023-01- 2022-11- 2023-02- 2022-12- 2024-02- 2023-12- en el acompañamiento y as TF / B5182 ograms for Sustainable La Posterior Individual Open - National 17,932.75 0.00 Finalizado 9 10 11 28 19 28 09 20 04 21 istencia técnica a los munic ndscape Management ipios obligados al cumplimi ento de la orden 3 de la Se ntencia 4360 de 2018 y a l a implementación del Conp es 4021 de 2020 CO-PNF-319317-CS-INDV / Prestar servicios profesiona les para apoyar a Corponar Component 3 - Sectoral Pr iño, en el acompañamiento 2022-12-1 2022-10- 2023-01- 2022-11- 2023-02- 2022-11- 2023-02- 2022-12- 2024-02- 2023-12- TF / B5182 ograms for Sustainable La Posterior Individual Open - National 17,932.75 0.00 Finalizado y asistencia técnica a los m 9 19 25 28 02 28 23 20 18 21 ndscape Management unicipios obligados al cump limiento de la orden 3 de la Sentencia 4360 de 2018 y a la implementación del Co npes 4021 de 2020. CO-PNF-319318-CS-INDV / Prestar servicios profesiona les para apoyar a la CRC, e Component 3 - Sectoral Pr n el acompañamiento y asi 2022-12-1 2022-10- 2023-01- 2022-11- 2023-02- 2022-11- 2023-02- 2022-12- 2023-12- 2023-10- TF / B5182 ograms for Sustainable La Posterior Individual Open - National 14,943.96 0.00 Finalizado stencia técnica a los munici 9 19 25 28 02 28 23 19 20 20 ndscape Management pios obligados al cumplimie nto de la orden 3 de la Sen tencia 4360 de 2018 y a la implementación del Conpe s 4021 de 2020. CO-PNF-319323-CS-INDV / Prestar servicios profesiona les para fortalecer la gestió Component 3 - Sectoral Pr n territorial sectorial en infr 2022-12-1 2022-10- 2022-12- 2022-10- 2023-01- 2022-10- 2023-01- 2022-10- 2024-01- 2023-11- TF / B5182 ograms for Sustainable La Posterior Individual Limited 27,189.01 0.00 Finalizado aestructura de transporte, 9 10 27 13 11 25 26 31 21 01 ndscape Management generando capacidades en las entidades territoriales p ara el uso y la aplicación d e los instrumentos técnicos que se han formulado. CO-PNF-297003-CS-INDV / Prestar sus servicios profes ionales para apoyar en el s Component 2 - Forest Gov eguimiento técnico y opera 2022-09-3 2022-10- 2022-10- 2022-10- 2023-04- TF / A5789 ernance, Management and Posterior Individual Limited 10,000.00 0.00 Cancelado tivo de las actividades rela 0 05 12 29 27 Monitoring cionadas con la continuida d en la operación del Siste ma de Monitoreo de Bosqu es y Carbono para Colombi a – SMBYC. CO-PNF-321442-CS-INDV / Prestar servicios profesiona les para apoyar a la CDA, e Component 3 - Sectoral Pr 2022-12-1 2023-01- 2023-01- 2023-01- 2023-02- 2024-02- n el acompañamiento y asi TF / B5182 ograms for Sustainable La Posterior Individual Open - National 17,932.75 0.00 Cancelado 9 24 13 20 06 01 stencia técnica a los munici ndscape Management pios obligados al cumplimie nto de la orden 3 de la Sen tencia 4360 de 2018. CO-PNF-321443-CS-INDV / Prestar sus servicios profes ionales para apoyar técnica Component 3 - Sectoral Pr mente la toma de decision 2022-12-1 2022-10- 2022-12- 2022-10- 2023-01- 2022-11- 2023-01- 2022-11- 2023-09- 2023-02- TF / B5182 ograms for Sustainable La Posterior Individual Direct - National 24,906.60 0.00 Finalizado es del Viceministerio de Or 9 20 29 25 05 10 22 17 19 10 ndscape Management denamiento Ambiental del Territorio (OAT) en los tem as de su competencia relac ionados con la Amazonia C olombiana. CO-PNF-319324-CS-INDV / Prestar sus servicios profes ionales para apoyar a la CD A en la generación, interpr Component 2 - Forest Gov 2022-12-1 2022-10- 2022-12- 2022-10- 2023-01- 2022-11- 2023-01- 2022-11- 2024-01- 2023-11- etación, procesamiento y a TF / B5182 ernance, Management and Posterior Individual Direct - National 13,449.56 0.00 Finalizado 9 20 29 25 05 02 19 11 14 15 nálisis de datos e informaci Monitoring ón geoespacial, para la to ma de decisiones en relaci ón con las nuevas áreas de implementación; seguimien to y monitoreo. CO-PNF-322109-CS-INDV / Prestar servicios profesiona les para el fortalecimiento Component 1 - Protected del sistema de información 2022-12-1 2023-05- 2023-01- 2023-10- 2023-01- 2023-10- 2023-02- 2023-11- 2023-06- 2024-05- TF / A5789 Areas Management and Fi Posterior Individual Open - National 4,981.32 0.00 Finalizado geográfica y modelación de 9 16 16 19 23 19 09 02 09 07 nancial Sustainability la información georreferen ciada, para el análisis de co nectividad y fragmentación en el corredor de conectivi dad. CO-PNF-242182-CS-INDV / Crear los contenidos y el m aterial audiovisual y propo Component 2 - Forest Gov nga e implemente los esce 2022-12-1 2023-01- 2023-01- 2023-02- 2023-08- TF / A5789 ernance, Management and Posterior Individual Open - National 3,284.00 0.00 Cancelado narios y mecanismos para l 9 18 25 11 10 Monitoring a socialización de resultado s y el proceso de transfere ncia tecnológica con las en tidades del SINA y la comu nidad en general. CO-PNF-326180-CS-INDV / Prestar sus servicios profes ionales para el seguimiento Component 4 - Project Coo técnico, monitoreo y docu rdination, Management, M 2022-12-1 2022-11- 2022-12- 2022-12- 2023-01- 2022-12- 2023-01- 2022-12- 2023-12- 2023-04- TF / B5182 Posterior Individual Direct - National 29,620.58 0.00 Finalizado mentación de los procesos onitoring and Evaluation ( 9 29 29 05 05 12 19 21 15 25 de programación, ejecució M&E) n y evaluación del Proyecto Corazón de la Amazonia, b ajo la orientación de la Coo rdinación General. Page 13 CO-PNF-333250-CS-INDV / Para desempeñar el cargo de Profesional Orientación Component 4 - Project Coo y Seguimiento Salvaguarda rdination, Management, M 2023-01-3 2022-12- 2023-02- 2022-12- 2023-02- 2022-12- 2023-03- 2023-01- 2024-02- TF / B5182 Posterior Individual Direct - National 22,911.00 0.00 Rescindido s y éste se obliga a orientar onitoring and Evaluation ( 0 26 09 27 16 28 02 05 25 y hacer el seguimiento a la M&E) debida aplicación de los ins trumentos de salvaguardas sociales del proyecto GEF C orazón de la Amazonia. CO-PNF-333251-CS-INDV / Para desempeñar el cargo de Enlace de Gestión Territ Component 4 - Project Coo orial y de Seguimiento a la rdination, Management, M 2023-01-3 2022-12- 2023-02- 2022-12- 2023-02- 2022-12- 2023-03- 2023-01- 2024-02- TF / B5182 Posterior Individual Direct - National 28,634.00 0.00 Firmado Planeación y Ejecución Téc onitoring and Evaluation ( 0 26 09 27 16 29 02 05 25 nica Operativa Regional Gu M&E) aviare – Sur Meta y éste se obliga a apoyar a la coordi nación general del proyect o. CO-PNF-333252-CS-INDV / Para desempeñar el cargo de Asistente de Adquisicion Component 4 - Project Coo es del proyecto GEF Corazó rdination, Management, M 2023-01-3 2022-12- 2023-02- 2022-12- 2023-02- 2022-12- 2023-03- 2023-01- 2024-02- TF / B5182 Posterior Individual Direct - National 11,094.00 0.00 Firmado n de la Amazonia y éste se onitoring and Evaluation ( 0 26 09 27 16 28 02 05 25 obliga a brindar apoyo en l M&E) os procesos de adquisicion es de acuerdo con lo establ ecido en los Acuerdos Lega les de Donación CO-PNF-333255-CS-INDV / Para desempeñar el cargo de Profesional Técnico de A Component 4 - Project Coo dquisiciones y éste se oblig rdination, Management, M 2023-01-3 2022-12- 2023-02- 2022-12- 2023-02- 2022-12- 2023-03- 2023-01- 2024-02- TF / B5182 Posterior Individual Direct - National 17,331.00 0.00 Firmado a a dar soporte, apoyar y a onitoring and Evaluation ( 0 26 09 27 16 29 02 05 25 compañar a las entidades s M&E) ocias en la elaboración de l os diferentes insumos técni cos que soportan los proce sos de adquisiciones. CO-PNF-333260-CS-INDV / Para desempeñar el cargo de Especialista de Adquisici Component 4 - Project Coo ones y éste se obliga a real rdination, Management, M 2023-01-3 2022-12- 2023-02- 2022-12- 2023-02- 2022-12- 2023-03- 2023-01- 2024-02- izar los procesos de adquisi TF / B5182 Posterior Individual Direct - National 37,676.00 0.00 Firmado onitoring and Evaluation ( 0 26 09 27 16 28 02 05 25 ciones y contrataciones qu M&E) e se requieran de acuerdo con lo establecido en los Ac uerdos Legales de Donació n, el Manual Operativo del del Proyecto. CO-PNF-333261-CS-INDV / Para desempeñar el cargo de Profesional Financiero y Component 4 - Project Coo éste se obliga a brindar asi rdination, Management, M 2023-01-3 2022-12- 2023-02- 2022-12- 2023-02- 2022-12- 2023-03- 2023-01- 2024-02- TF / B5182 Posterior Individual Direct - National 16,163.00 0.00 Firmado stencia financiera y admini onitoring and Evaluation ( 0 26 09 27 16 28 02 05 25 strativa para garantizar la M&E) presentación oportuna de i nformación y efectividad e n los procesos fiduciarios d el proyecto. CO-PNF-333272-CS-INDV / Prestar sus servicios profes ionales para orientar la ges Component 1 - Protected tión y manejo del Parque N 2023-03-3 2023-01- 2023-04- 2023-01- 2023-04- 2023-02- 2023-05- 2023-02- 2024-05- 2024-02- TF / B5182 Areas Management and Fi Posterior Individual Limited 11,065.00 0.00 Finalizado atural Regional Miraflores y 0 23 07 27 22 08 08 16 02 20 nancial Sustainability Picachos en el departamen to de Caquetá, a través del fortalecimiento de la gober nanza local del área proteg ida. CO-PNF-333276-CS-INDV / Prestar sus servicios profes ionales como enlace de ap Component 4 - Project Coo oyo a la gestión territorial d rdination, Management, M 2023-03-3 2023-04- 2023-05- 2023-05- 2023-05- 2023-05- 2023-06- 2023-06- 2023-11- 2023-12- e la coordinación general d TF / B5182 Posterior Individual Open - National 12,448.00 0.00 Finalizado onitoring and Evaluation ( 0 12 07 25 15 25 01 21 28 25 el proyecto “Conservación M&E) y Sostenibilidad de Bosque s en el Corazón de la Amaz onia” en comunicación con las entidades socias imple mentadoras. CO-PNF-333277-CS-INDV / Prestar sus servicios profes ionales para liderar el proc eso de concertación social Component 2 - Forest Gov 2023-03-3 2023-01- 2023-04- 2023-04- 2023-05- 2024-05- requerido para el acompañ TF / B5182 ernance, Management and Posterior Individual Limited 11,065.00 0.00 Cancelado 0 23 07 22 09 03 amiento comunitario en el Monitoring montaje de núcleos de des arrollo forestal y e impleme ntación de la restauración en áreas degradadas priori zadas. CO-PNF-326186-CS-INDV / Prestar sus servicios profes ionales en la orientación y acompañamiento técnico p Component 2 - Forest Gov 2023-01-3 2022-12- 2023-02- 2022-12- 2023-02- 2023-01- 2023-03- 2023-01- 2024-02- 2024-03- ara la implementación de l TF / A5789 ernance, Management and Posterior Individual Direct - National 28,354.08 0.00 Finalizado 0 27 09 28 16 19 02 27 25 30 as líneas de acción relacion Monitoring adas con los componentes del Proyecto “Conservación de bosques y sostenibilidad en el Corazón de la Amazo nia” . CO-PNF-333291-CS-INDV / Prestar sus servicios profes ionales para crear los conte Component 2 - Forest Gov nidos y el material audiovis 2023-01-3 2022-12- 2023-03- 2023-02- 2023-03- 2023-02- 2023-04- 2023-02- 2023-07- 2023-05- TF / A5789 ernance, Management and Posterior Individual Open - National 3,285.00 0.00 Finalizado ual, proponer e implement 0 27 09 09 17 09 03 27 02 26 Monitoring ar los escenarios y mecanis mos para la socialización d e resultados y el proceso d e transferencia tecnológica con las entidades del SINA. CO-PNF-333292-CS-INDV / Prestar sus servicios profes ionales para realizar activid Component 1 - Protected ades enmarcadas en el apo 2023-03-3 2023-01- 2023-04- 2023-02- 2023-04- 2023-02- 2023-05- 2023-03- 2023-11- 2023-09- TF / A5789 Areas Management and Fi Posterior Individual Limited 5,671.00 0.00 Finalizado yo a la ejecución de accion 0 23 07 01 22 17 09 02 05 05 nancial Sustainability es programadas por CORP OAMAZONIA y Parques Nac ionales Naturales para la pr evención, vigilancia y contr ol de las presiones CO-PNF-333269-CS-INDV / Para desempeñar el cargo de Especialista Financiera P Component 4 - Project Coo royecto GEF Corazón de la rdination, Management, M 2023-01-3 2022-12- 2023-02- 2022-12- 2023-02- 2022-12- 2023-03- 2023-01- 2024-02- TF / B5182 Posterior Individual Direct - National 37,676.27 0.00 Firmado Amazonia y éste se obliga onitoring and Evaluation ( 0 27 09 27 16 28 02 16 25 a orientar a las entidades s M&E) ocias en los procedimiento s fiduciarios de conformida d con las directrices financi eras del Banco Mundial CO-PNF-333259-CS-INDV / Desempeñar el cargo de As istente documental del Sys Component 4 - Project Coo tematic Tracking of Exchan rdination, Management, M 2023-01-3 2022-12- 2023-02- 2022-12- 2023-02- 2022-12- 2023-03- 2023-01- 2024-02- TF / B5182 Posterior Individual Direct - National 9,083.00 0.00 Firmado ges in Procurement - STEP onitoring and Evaluation ( 0 27 09 27 16 28 02 05 25 y éste se obliga a ordenar M&E) y cargar los documentos d e los procesos de adquisici ones de conformidad con lo s lineamientos establecidos .CO-PNF-333248-CS-INDV / Para desempeñar el cargo de Coordinador General del Component 4 - Project Coo Proyecto y éste se obliga a rdination, Management, M 2023-01-3 2022-12- 2023-02- 2022-12- 2023-02- 2022-12- 2023-03- 2023-01- 2024-02- TF / B5182 Posterior Individual Direct - National 49,836.12 0.00 Firmado liderar el proyecto “Conser onitoring and Evaluation ( 0 27 09 27 16 30 02 05 25 vación de Bosques y Soste M&E) nibilidad en el Corazón de l a Amazonia”, tanto en los a spectos técnicos, operativo s y administrativos. CO-PNF-333266-CS-INDV / Para desempeñar el cargo de Auxiliar Contable y Fina Component 4 - Project Coo nciero y éste se obliga a re rdination, Management, M 2023-01-3 2022-12- 2023-02- 2022-12- 2023-02- 2022-12- 2023-03- 2023-01- 2024-02- TF / B5182 Posterior Individual Direct - National 5,834.54 0.00 Firmado alizar la revisión y registro onitoring and Evaluation ( 0 27 09 28 16 30 02 05 25 de las legalizaciones del pr M&E) oyecto GEF Corazón Amazo nia de conformidad con los lineamientos establecidos. CO-PNF-333265-CS-INDV / Para desempeñar el cargo de Asistente Administrativo Component 4 - Project Coo y financiero y éste se oblig rdination, Management, M 2023-01-3 2022-12- 2023-02- 2022-12- 2023-02- 2022-12- 2023-03- 2023-01- 2024-02- TF / B5182 Posterior Individual Direct - National 10,350.67 0.00 Firmado a a asistir las actividades d onitoring and Evaluation ( 0 27 09 27 16 30 02 05 25 e carácter administrativo, o M&E) perativo y financiero, reque ridos en el seguimiento a la planeación, programación y ejecución. CO-PNF-328437-CS-CDS / Auditoría de los recursos a dministrados por Patrimoni Component 4 - Project Coo Selección direct o Natural y el Instituto SINC rdination, Management, M 2023-03-3 2023-01- 2023-05- 2023-01- 2023-05- 2023-03- 2023-09- 2023-07- TF / A5789 Posterior a de consultore Direct - National 11,526.05 0.00 Finalizado HI bajo el (TFA5789) de la onitoring and Evaluation ( 0 16 07 25 29 28 11 12 s primera financiación adicio M&E) nal, (TF0B5182) de la segu nda financiación adicional y GEF PPG No. TF0B1287-C O del Proyecto. CO-PNF-319312-CS-INDV / Prestar sus servicios profes ionales dirigidos a construir Component 1 - Protected y orientar la implementació 2022-12-1 2022-10- 2022-12- 2023-01- 2023-01- 2023-08- TF / A5789 Areas Management and Fi Posterior Individual Limited 12,204.23 0.00 Cancelado n de la estrategia de comu 4 10 22 06 21 19 nancial Sustainability nicación del Programa HEC O para el corredor Macaren a-Chibiriquete, donde se so cialice, contextualice y visi bilice el mecanismo financi CO-PNF-316137-CS-INDV / ero. Prestar sus servicios profes ionales para liderar como e nlace desde el nivel central Component 1 - Protected 2022-12-1 2022-10- 2023-01- 2023-02- 2023-02- 2023-05- de Parques Nacionales Nat TF / A5789 Areas Management and Fi Posterior Individual Open - National 4,230.77 0.00 Cancelado 9 14 26 03 24 25 urales, la planificación, imp nancial Sustainability lementación y seguimiento de las actividades de resta uración de las áreas proteg idas de PNN en el marco de l proyecto CO-PNF-336472-CS-INDV / Prestar sus servicios profes ionales para apoyar a la co Component 4 - Project Coo ordinación del SMBYC y a l rdination, Management, M 2023-03-3 2023-01- 2023-04- 2023-01- 2023-04- 2023-01- 2023-05- 2023-01- 2024-03- 2023-12- TF / A5789 Posterior Individual Direct - National 22,130.01 0.00 Finalizado a Subdirección de Ecosiste onitoring and Evaluation ( 1 19 10 20 17 23 04 27 29 30 mas e Información Ambient M&E) al del IDEAM en las activida des de seguimiento y moni toreo administrativo, financ iero. CO-PNF-336476-CS-INDV / Prestar sus servicios profes Component 4 - Project Coo ionales para el desarrollo g rdination, Management, M 2023-03-3 2023-01- 2023-04- 2023-01- 2023-04- 2023-02- 2023-05- 2023-02- 2024-03- 2024-01- TF / B5182 Posterior Individual Direct - National 25,892.12 0.00 Finalizado ráfico y editorial de la ident onitoring and Evaluation ( 1 19 10 20 17 01 04 07 29 06 idad visual y posicionamien M&E) to del proyecto GEF Corazó n de la Amazonia. CO-PNF-336483-CS-INDV / Prestar sus servicios profes Component 4 - Project Coo ionales (PDI2) para generar rdination, Management, M 2023-03-3 2023-01- 2023-04- 2023-01- 2023-04- 2023-01- 2023-05- 2023-01- 2024-03- Alertas Tempranas de Defo TF / B5182 Posterior Individual Direct - National 20,318.12 0.00 Rescindido onitoring and Evaluation ( 1 19 10 20 17 23 04 31 29 restación e información te M&E) mática de monitoreo de la superficie de bosque y defo restación a nivel nacional y /o regional. CO-PNF-336498-CS-INDV / Prestar sus servicios profes ionales (PDI1) para generar Component 4 - Project Coo Alertas Tempranas de Defo rdination, Management, M 2023-03-3 2023-01- 2023-04- 2023-01- 2023-04- 2023-01- 2023-05- 2023-01- 2024-03- restación e información te TF / B5182 Posterior Individual Direct - National 20,318.12 0.00 Rescindido onitoring and Evaluation ( 1 18 10 20 17 23 04 27 29 mática de monitoreo de la M&E) superficie de bosque y defo restación a nivel nacional y /o regional como insumo p ara la consolidación de cifr as oficiales. CO-PNF-336505-CS-INDV / Prestar sus servicios profes ionales para la validación, i Component 4 - Project Coo mplementación y el diseño rdination, Management, M 2023-03-3 2023-01- 2023-04- 2023-01- 2023-04- 2023-01- 2023-05- 2023-01- 2024-03- 2023-12- TF / B5182 Posterior Individual Direct - National 28,478.56 0.00 Finalizado del sistema de control de c onitoring and Evaluation ( 1 19 10 20 17 23 04 31 29 30 alidad en lo referente al co M&E) mponente de Procesamient o Digital de Imágenes de s atélite para la generación d e cifras oficiales de monitor CO-PNF-336512-CS-INDV / eo. Prestar sus servicios profes ionales para dirigir y consol Component 4 - Project Coo idar temáticamente el proc rdination, Management, M 2023-03-3 2023-01- 2023-04- 2023-01- 2023-04- 2023-01- 2023-05- 2023-01- 2024-03- TF / B5182 Posterior Individual Direct - National 34,827.11 0.00 Firmado eso de generación de infor onitoring and Evaluation ( 1 19 10 23 17 25 04 30 29 mación sobre la superficie M&E) de bosque y los cambios en la superficie de boques y/o la degradación forestal a ni vel nacional y/o regional. CO-PNF-336800-CS-INDV / Prestar sus servicios profes ionales administrativos par a facilitar, apoyar, acompa Component 1 - Protected 2023-03-3 2023-01- 2023-04- 2023-01- 2023-04- 2023-02- 2023-05- 2023-02- 2024-04- 2024-02- ñar y gestionar con las áre TF / A5789 Areas Management and Fi Posterior Individual Direct - National 15,665.28 0.00 Finalizado 1 19 10 25 17 03 04 13 28 12 as protegidas de la Direcci nancial Sustainability ón Territorial Amazonía que cobija el Proyecto Conserva ción de Bosques y Sostenib ilidad en el Corazón de la A mazonía. CO-PNF-336815-CS-INDV / Apoyar a la Corporación pa ra el Desarrollo Sostenible Component 2 - Forest Gov 2023-03-3 2023-01- 2023-04- 2023-01- 2023-04- 2023-02- 2023-05- 2023-02- 2024-04- del Norte y Oriente Amazó TF / B5182 ernance, Management and Posterior Individual Direct - National 17,796.95 0.00 Rescindido 1 20 10 27 17 03 04 21 28 nico – CDA en la consolidac Monitoring ión de nuevos Acuerdos de Conservación, Restauració n y No Deforestación, evalu ación y seguimiento. CO-PNF-336494-CS-INDV / Prestar sus servicios profes ionales para apoyar la gen Component 4 - Project Coo eración de información tem rdination, Management, M 2023-03-3 2023-01- 2023-04- 2023-01- 2023-04- 2023-01- 2023-05- 2023-01- 2024-03- 2023-12- TF / B5182 Posterior Individual Direct - National 18,990.32 0.00 Finalizado ática de monitoreo de alert onitoring and Evaluation ( 1 20 10 20 17 23 04 27 29 30 as tempranas de deforesta M&E) ción y minería ilegal en áre as de interés de la Direcció n Territorial Amazonia -DTA M. CO-PNF-339638-CS-INDV / Apoyar al proyecto GEF Cor azón de la Amazonia en la r ealización, procesamiento Component 1 - Protected 2023-03-3 2023-02- 2023-04- 2023-02- 2023-04- 2023-02- 2023-05- 2023-03- 2024-04- 2024-11- y análisis de estudios de m TF / A5789 Areas Management and Fi Posterior Individual Direct - National 11,065.00 0.00 Finalizado 1 07 10 10 17 23 04 02 28 05 ercado, generando recome nancial Sustainability ndaciones con base en los r esultados de los estudios y presentando la información de forma estadística y en i nformes. CO-PNF-339662-CS-INDV / Prestar sus servicios perso nales para apoyar la imple Component 1 - Protected mentación del programa d 2023-03-3 2023-02- 2023-04- 2023-02- 2023-04- 2023-02- 2023-05- 2023-03- 2024-04- 2024-02- TF / B5182 Areas Management and Fi Posterior Individual Direct - National 8,514.98 0.00 Finalizado e control y vigilancia y de 1 07 10 10 20 22 07 03 01 06 nancial Sustainability manejo de los recursos nat urales en el sitio Ramsar Es trella Fluvial del Inírida, me diante la facilitación, acom pañamiento técnico y logíst CO-PNF-339664-CS-INDV / ico Prestar servicios profesiona les para la incorporación de Component 3 - Sectoral Pr la variable ambiental en los 2023-03-3 2023-02- 2023-04- 2023-02- 2023-04- 2023-02- 2023-05- 2023-03- 2024-04- TF / B5182 ograms for Sustainable La Posterior Individual Limited 30,428.77 0.00 Firmado instrumentos de planificaci 1 07 05 10 15 17 02 07 26 ndscape Management ón y de formulación de pro yectos del sector transport e en los modos carretero, a éreo, fluvial y férreo, así co mo el fortalecimiento. CO-PNF-339666-CS-INDV / Prestar sus servicios como profesional de Sistemas de Component 2 - Forest Gov Información Geográfica – SI 2023-03-3 2023-02- 2023-04- 2023-02- 2023-04- 2023-03- 2023-05- 2023-03- 2024-01- 2023-12- TF / B5182 ernance, Management and Posterior Individual Limited 8,298.76 0.00 Finalizado G, para la generación, estr 1 13 05 21 15 07 02 22 27 23 Monitoring ucturación y procesamient o de información geográfic a de las áreas donde se im plementarán los núcleos de desarrollo forestal sostenibl CO-PNF-339667-CS-INDV / e. Prestar sus servicios profes ionales para orientar técnic amente los procesos orient Component 2 - Forest Gov 2023-03-3 2023-02- 2023-04- 2023-02- 2023-04- 2023-03- 2023-05- 2023-04- 2024-04- 2024-04- ados a la aplicación de prá TF / B5182 ernance, Management and Posterior Individual Limited 13,831.26 0.00 Finalizado 1 08 05 20 15 15 02 12 26 17 cticas de manejo forestal s Monitoring ostenible en las áreas terre stres priorizadas por Corpo amazonia en el departame nto de Caquetá, en el marc o del proyecto CO-PNF-339672-CS-INDV / Prestar sus servicios profes ionales para realizar activid ades requeridas para optim Component 2 - Forest Gov 2023-03-3 2023-02- 2023-04- 2023-02- 2023-04- 2023-03- 2023-05- 2023-04- 2024-04- izar y fortalecer el manejo f TF / B5182 ernance, Management and Posterior Individual Limited 13,831.26 0.00 Firmado 1 08 05 21 15 16 02 11 26 orestal sostenible, de tal m Monitoring anera, que se consoliden la s cadenas de valor del sect or forestal en el marco de u na economía forestal soste nible. CO-PNF-339969-CS-INDV / Prestar servicios profesiona les para liderar, impulsar y acompañar la gestión interi Component 3 - Sectoral Pr 2023-03-3 2023-02- 2023-04- 2023-02- 2023-04- 2023-03- 2023-05- 2023-03- 2024-04- nstitucional y la adopción d TF / B5182 ograms for Sustainable La Posterior Individual Limited 24,896.27 0.00 Firmado 1 07 05 11 15 07 02 22 26 e acuerdos, criterios y herr ndscape Management amientas de planeación y g estión ambiental sostenible que sean generados en el marco de la “Mesa Técnica Ambiental" CO-PNF-339970-CS-INDV / Prestar sus servicios profes ionales para orientar técnic amente los procesos para l Component 2 - Forest Gov 2023-03-3 2023-02- 2023-04- 2023-02- 2023-04- 2023-03- 2023-05- 2023-04- 2024-04- a aplicación de prácticas d TF / B5182 ernance, Management and Posterior Individual Limited 13,831.26 0.00 Firmado 1 13 05 20 15 07 02 03 26 e manejo forestal sostenibl Monitoring e en las áreas terrestres pri orizadas por CORPOAMAZO NIA en el Departamento de Amazonas en el marco del proyecto. CO-PNF-339971-CS-INDV / Prestar sus servicios profes ionales para liderar jurídica mente los procesos para la Component 2 - Forest Gov 2023-03-3 2023-04- 2023-04- 2023-05- 2024-04- aplicación de prácticas de TF / B5182 ernance, Management and Posterior Individual Limited 12,448.13 0.00 Cancelado 1 05 15 02 26 manejo forestal sostenible Monitoring en bosque natural, en las á reas priorizadas por CORPO AMAZONIA en el marco del proyecto GEF Corazón de la Amazonia. CO-PNF-339973-CS-INDV / Prestar sus servicios profes ionales para orientar técnic Component 2 - Forest Gov amente los nuevos proceso 2023-03-3 2023-02- 2023-04- 2023-02- 2023-04- 2023-03- 2023-05- 2023-04- 2024-04- 2024-04- TF / B5182 ernance, Management and Posterior Individual Limited 11,035.01 0.00 Finalizado s y prácticas para la restau 1 08 05 20 15 16 02 03 26 09 Monitoring ración ecológica de áreas d egradadas en las áreas prio rizadas por CORPOAMAZON IA y seguimiento a los ya e stablecidos. Page 14 CO-PNF-339637-CS-INDV / Prestar sus servicios profes ionales para desarrollar las Component 4 - Project Coo acciones de comunicación, rdination, Management, M 2023-03-3 2023-02- 2023-04- 2023-02- 2023-04- 2023-03- 2023-05- 2023-03- 2024-03- 2024-02- TF / A5789 Posterior Individual Direct - National 27,508.99 0.00 Finalizado asesoría y orientación técni onitoring and Evaluation ( 1 16 10 20 17 06 04 10 29 14 ca necesarias para asegura M&E) r la articulación entre los ni veles local (6 áreas prioriza das), regional y nacional de PNN con la coordinación. CO-PNF-342800-CS-INDV / Prestar sus servicios profes ionales para apoyar técnica mente la planificación, con Component 1 - Protected 2023-03-3 2023-02- 2023-04- 2023-03- 2023-04- 2023-03- 2023-04- 2023-04- 2023-12- 2024-03- certación, implementación TF / A5789 Areas Management and Fi Posterior Individual Limited 10,142.92 0.00 Finalizado 1 16 05 01 12 24 29 03 25 09 y seguimiento de actividad nancial Sustainability es de restauración con la c omunidad indígena del Res guardo El Itilla en el PNN S erranía de Chiribiquete (PN N SCH). CO-PNF-342801-CS-INDV / Prestar sus servicios técnic os para apoyar las activida Component 1 - Protected des de planificación, conce 2023-03-3 2023-02- 2023-04- 2023-03- 2023-04- 2023-03- 2023-04- 2023-04- 2023-12- 2024-10- TF / A5789 Areas Management and Fi Posterior Individual Limited 5,532.50 0.00 Finalizado rtación, implementación y 1 16 05 01 12 17 29 03 25 09 nancial Sustainability seguimiento a las acciones de restauración ecológica e n el Resguardo El Itilla, loca lizado al interior del PNN Se rranía de Chiribiquete. CO-PNF-342803-CS-INDV / Apoyar en la implementaci ón de la estrategia de com unicaciones a través de la Component 2 - Forest Gov 2023-03-3 2023-02- 2023-04- 2023-02- 2023-04- 2023-03- 2023-05- 2023-03- 2024-04- 2024-03- elaboración de piezas visua TF / B5182 ernance, Management and Posterior Individual Direct - National 8,298.76 0.00 Finalizado 1 16 10 20 17 10 04 22 28 23 les, gráficas y escritas de al Monitoring ta calidad como instrument os de apoyo metodológico en los procesos de concert ación social e institucional del proyecto. CO-PNF-342806-CS-INDV / Prestar servicios profesiona les para apoyar en el segui Component 4 - Project Coo miento técnico y operativo rdination, Management, M 2023-03-3 2023-02- 2023-05- 2023-03- 2023-05- 2023-03- 2023-06- 2023-04- 2024-03- de las actividades relacion TF / B5182 Posterior Individual Open - National 18,441.68 0.00 Firmado onitoring and Evaluation ( 1 17 08 31 16 31 02 14 28 adas con la continuidad en M&E) la operación del Sistema de Monitoreo de Bosques y Ca rbono para Colombia – SMB YC, en el marco del Proyect o GEF . CO-PNF-349263-CS-INDV / Prestar sus servicios profes ionales para apoyar en la g eneración de insumos, sop Component 3 - Sectoral Pr 2023-06-3 2023-03- 2023-07- 2023-03- 2023-07- 2023-04- 2023-08- 2023-04- 2024-08- ortes y conceptos técnicos TF / B5182 ograms for Sustainable La Posterior Individual Limited 18,533.89 0.00 Rescindido 0 16 08 29 23 13 09 19 03 para la toma de decisiones ndscape Management en relación con la gestión a mbiental de proyectos de c onstrucción o intervención de infraestructura de trans porte. CO-PNF-349264-CS-INDV / Apoyar la actividades oper ativas y logísticas con el fin de dar cumplimiento al des Component 1 - Protected 2023-06-3 2023-03- 2023-07- 2023-03- 2023-07- 2023-03- 2023-08- 2023-04- 2024-01- 2024-04- arrollo del plan de trabajo a TF / B5182 Areas Management and Fi Posterior Individual Direct - National 3,883.81 0.00 Finalizado 0 16 10 21 17 27 03 14 30 17 cordado con ATICOYA y las nancial Sustainability entidades socias del Proyec to GEF Corazón de la Amaz onía, que permita avanzar con la implementación de l as líneas. CO-PNF-349269-CS-INDV / Prestar sus servicios profes ionales para orientar a los s Component 4 - Project Coo ocios y liderar la implemen rdination, Management, M 2023-03-3 2023-03- 2023-04- 2023-03- 2023-04- 2023-03- 2023-05- 2023-04- 2024-04- 2024-04- TF / B5182 Posterior Individual Direct - National 28,564.32 0.00 Finalizado tación de la estrategia de c onitoring and Evaluation ( 1 16 10 21 17 27 04 11 28 16 omunicaciones, divulgación M&E) y gestión del conocimiento a nivel nacional, regional y local del Proyecto GEF Cora zón de la Amazonia. CO-PNF-349262-CS-INDV / Prestar sus servicios profes ionales para desempeñar e Component 4 - Project Coo l cargo de Profesional de a rdination, Management, M 2023-03-3 2023-03- 2023-04- 2023-03- 2023-04- 2023-03- 2023-05- 2023-03- 2024-04- 2024-03- TF / B5182 Posterior Individual Direct - National 13,941.91 0.00 Finalizado poyo jurídico y de Adquisici onitoring and Evaluation ( 1 21 10 21 17 22 01 23 25 15 ones y éste se obliga con el M&E) primero a brindar apoyo jur ídico en las adquisiciones y contrataciones que se requ ieran. CO-PNF-356568-CS-INDV / Prestar sus servicios profes ionales para dar soporte, a poyar y acompañar la reali Component 1 - Protected 2023-06-3 2023-04- 2023-07- 2023-04- 2023-07- 2023-05- 2023-08- 2023-05- 2024-08- 2024-11- zación de procesos de adq TF / A5789 Areas Management and Fi Posterior Individual Direct - National 18,589.21 0.00 Finalizado 0 17 23 19 31 02 17 09 11 10 uisiciones y contrataciones nancial Sustainability que se requieran en el mar co de la ejecución del Proy ecto “Conservación de Bos ques y Sostenibilidad en el Corazón de la A CO-PNF-356570-CS-INDV / Prestar sus servicios profes ionales para la planificació n, concertación, implement Component 1 - Protected 2023-06-3 2023-04- 2023-07- 2023-05- 2023-08- 2023-05- 2023-08- 2023-06- 2024-04- 2024-02- ación y seguimiento de acti TF / A5789 Areas Management and Fi Posterior Individual Open - National 10,142.92 0.00 Finalizado 0 18 31 18 08 18 25 07 21 12 vidades de Restauración en nancial Sustainability el PNN La Paya con la com unidad Gao ya y Bajo Casa cunte de la Asociación de C abildos Indígenas del Puebl o Siona (ACIPS) CO-PNF-356576-CS-INDV / Contrata los servicios profe sionales del TRABAJADOR p Component 4 - Project Coo ara desempeñar el cargo d rdination, Management, M 2023-06-3 2023-04- 2023-07- 2023-04- 2023-07- 2023-05- 2023-08- 2023-05- 2024-07- e Profesional de Seguimien TF / B5182 Posterior Individual Direct - National 38,262.74 0.00 Firmado onitoring and Evaluation ( 0 17 10 17 17 08 03 12 28 to Técnico y Monitoreo del M&E) Proyecto GEF Corazón de la Amazonia y éste se obliga con el primero apoyar a la coordinación general en el seguimiento. CO-PNF-356578-CS-INDV / Prestar sus servicios profes ionales para la gestión, sus Component 3 - Sectoral Pr cripción y seguimiento técn 2023-06-3 2023-04- 2023-07- 2023-05- 2023-07- 2023-05- 2023-08- 2023-05- 2024-07- 2024-05- TF / B5182 ograms for Sustainable La Posterior Individual Limited 24,896.27 0.00 Finalizado ico de acuerdos con actore 0 21 05 02 20 11 06 22 31 23 ndscape Management s sectoriales y territoriales orientados a la aplicación e implementación de instrum entos técnicos y ambiental es. CO-PNF-356599-CS-INDV / Prestar sus servicios profes ionales para orientar a la C Component 2 - Forest Gov orporación para el Desarrol 2023-06-3 2023-05- 2023-07- 2023-06- 2023-08- 2023-06- 2023-08- 2023-06- 2024-04- 2024-03- TF / B5182 ernance, Management and Posterior Individual Open - National 8,298.76 0.00 Finalizado lo Sostenible del Norte y Or 0 26 31 20 08 20 25 28 21 03 Monitoring iente Amazónico – CDA en l a elaboración de un análisi s de cadenas de valor de pr oductos maderables y no maderables. CO-PNF-356601-CS-INDV / Prestar sus servicios profes ionales para apoyar a la Co Component 2 - Forest Gov rporación para el Desarroll 2023-06-3 2023-04- 2023-08- 2023-05- 2023-08- 2023-05- 2023-09- 2023-06- 2024-04- TF / B5182 ernance, Management and Posterior Individual Open - National 7,841.40 0.00 Rescindido o Sostenible del Norte y el 0 27 07 26 15 26 01 08 28 Monitoring Oriente Amazónico – CDA, en la construcción de mane ra participativa de las línea s estratégicas y mecanism os de seguimiento y evalua CO-PNF-356606-CS-INDV / ción. Apoyar la gestión técnica y operativa de la estrategia d Component 2 - Forest Gov e atención a la situación de 2023-06-3 2023-08- 2023-08- 2023-09- 2024-04- TF / B5182 ernance, Management and Posterior Individual Open - National 7,841.40 0.00 Cancelado Uso, Ocupación y Tenencia 0 07 15 01 28 Monitoring del Parque Nacional Natura l Serranía de Los Churumb elos Auka Wasi, en el marc o del Proyecto GEF Corazón de la Amazonía. CO-PNF-356630-CS-INDV / Prestar sus servicios profes ionales para apoyar a la Co rporación para el Desarroll Component 2 - Forest Gov 2023-06-3 2023-04- 2023-08- 2023-05- 2023-08- 2023-05- 2023-09- 2023-06- 2024-04- 2024-02- o Sostenible del Norte y el TF / B5182 ernance, Management and Posterior Individual Open - National 7,841.40 0.00 Finalizado 0 18 07 26 15 26 01 16 28 20 Oriente Amazónico – CDA, Monitoring en la construcción de la est rategia financiera y el mod elo de gestión y operación para la administración de l os recursos CO-PNF-339640-CS-CDS / Realizar el acompañamient o e implementar el proyect Component 4 - Project Coo o piloto de la “Guía de inve Selección direct rdination, Management, M 2023-06-3 2023-10- 2023-07- 2023-10- 2023-08- 2023-11- 2024-08- 2024-11- stigación en educación, ges TF / A5789 Posterior a de consultore Direct - National 19,133.24 0.00 Finalizado onitoring and Evaluation ( 0 09 10 20 11 27 05 27 tión y conservación de uso s M&E) sostenible del territorio - pa ra grupos de investigación de instituciones educativas de la Amazonía colombiana ”. CO-PNF-356579-CS-INDV / Prestar sus servicios profes ionales para orientar meto Component 2 - Forest Gov dológicamente a la Corpora 2023-06-3 2023-05- 2023-07- 2023-06- 2023-08- 2023-06- 2023-08- 2023-06- 2024-04- TF / B5182 ernance, Management and Posterior Individual Open - National 8,483.17 0.00 Firmado ción para el Desarrollo Sost 0 23 31 23 08 23 25 30 21 Monitoring enible del Norte y en Orient e Amazónico – CDA, en la f ormulación y consolidación del Plan de Gestión Ambien tal Regional 2024 – 2035. CO-PNF-360911-CS-INDV / Realizar acompañamiento y la orientación estratégica en la implementación de lo Component 1 - Protected 2023-06-3 2023-05- 2023-07- 2023-05- 2023-07- 2023-05- 2023-08- 2023-06- 2024-07- 2024-09- s Acuerdos Políticos de Vol TF / A5789 Areas Management and Fi Posterior Individual Direct - National 16,542.48 0.00 Finalizado 0 17 12 18 19 26 05 05 30 07 untades con las tres asocia nancial Sustainability ciones – ACIPS, APKAC y AC ILAPP; apoyando la planeac ión, desarrollo y seguimien to a los Planes de Acción y la articulación CO-PNF-360926-CS-INDV / Prestar servicios profesiona les para apoyar a la CDA, e Component 3 - Sectoral Pr n el acompañamiento y asi 2023-06-3 2023-05- 2023-07- 2023-05- 2023-08- 2023-06- 2023-08- 2023-07- 2024-07- 2024-06- TF / B5182 ograms for Sustainable La Posterior Individual Open - National 14,453.67 0.00 Finalizado stencia técnica a los munici 0 23 26 29 02 27 19 11 14 13 ndscape Management pios obligados al cumplimie nto de la orden 3 de la Sen tencia 4360 de 2018 y a la implementación de la Estra tegia Nacional. CO-PNF-360927-CS-INDV / Prestar sus servicios profes ionales para apoyar en la g Component 3 - Sectoral Pr eneración de soportes y co 2023-06-3 2023-05- 2023-07- 2023-05- 2023-07- 2023-06- 2023-08- 2023-06- 2024-07- TF / B5182 ograms for Sustainable La Posterior Individual Limited 18,533.66 0.00 Firmado nceptos técnicos para la to 0 23 08 30 15 20 01 30 26 ndscape Management ma de decisiones en relaci ón con la gestión ambiental de proyectos de construcci ón o intervención de infrae structura de transporte. CO-PNF-360928-CS-INDV / Apoyar la gestión técnica y operativa de la estrategia d Component 1 - Protected e atención a la situación de 2023-06-3 2023-05- 2023-07- 2023-05- 2023-07- 2023-05- 2023-08- 2023-05- 2024-06- 2024-03- TF / B5182 Areas Management and Fi Posterior Individual Direct - National 10,027.66 0.00 Finalizado Uso, Ocupación y Tenencia 0 17 13 18 20 23 06 30 01 31 nancial Sustainability del Parque Nacional Natura l Serranía de Los Churumb elos Auka Wasi, en el marc o del Proyecto GEF Corazón de la Amazonía FA-2. CO-PNF-365664-CS-INDV / Prestar sus servicios perso nales como técnico indígen a en la planeación, análisis, Component 1 - Protected 2023-09-2 2023-06- 2023-10- 2023-06- 2023-10- 2023-06- 2023-10- 2023-07- 2024-08- 2024-05- seguimiento e implementa TF / A5789 Areas Management and Fi Posterior Individual Limited 5,825.73 0.00 Finalizado 9 23 04 26 11 29 31 12 26 17 ción del plan de acción del nancial Sustainability Acuerdo Político de Volunta des, apoyando la articulaci ón y coordinación, entre el Parque Nacional Natural La Paya. CO-PNF-365921-CS-INDV / Prestar sus servicios profes ionales para apoyar la gesti ón del Ministerio de Ambie Component 1 - Protected 2023-09-2 2023-06- 2023-10- 2023-08- 2023-10- 2023-08- 2023-11- 2024-07- nte y Desarrollo Sostenible TF / B5182 Areas Management and Fi Posterior Individual Open - National 11,065.01 0.00 Cancelado 9 23 15 28 22 28 22 19 en la consolidación del sitio nancial Sustainability Ramsar Estrella Fluvial Iníri da (EFI), en el marco de la i mplementación del proyect o GEF Corazón de la Amazo nia. CO-PNF-365923-CS-INDV / Prestar sus servicios técnic os para apoyar el aprestam Component 2 - Forest Gov iento y desarrollo de activi 2023-09-2 2023-06- 2023-10- 2023-08- 2023-11- 2023-08- 2023-11- 2023-08- 2024-07- TF / B5182 ernance, Management and Posterior Individual Open - National 4,979.25 0.00 Firmado dades operativas y la siste 9 23 28 04 04 04 21 17 18 Monitoring matización de la informació n en el marco de la formula ción del Plan de Gestión A mbiental Regional PGAR 20 24 – 2035 para la Corporaci CO-PNF-365926-CS-INDV / ón. Prestar sus servicios profes ionales con el fin de genera Component 1 - Protected r y procesar información es 2023-09-2 2023-06- 2023-10- 2023-06- 2023-10- 2023-06- 2023-11- 2023-07- 2025-02- TF / B5182 Areas Management and Fi Posterior Individual Direct - National 19,417.24 0.00 Firmado pacial de áreas priorizadas 9 23 09 27 16 29 02 12 24 nancial Sustainability por CORPOAMAZONIA para la restauración ecológica e n áreas degradadas; donde se implementen acuerdos de conservación. CO-PNF-367046-CS-INDV / Realizar la Interventoría de la obra civil “UNIDAD DE AL OJAMIENTO Y ÁREAS COMP Component 2 - Forest Gov 2023-09-2 2023-08- 2023-10- 2023-09- 2023-11- 2023-09- 2023-11- 2023-10- 2024-06- LEMENTARÍAS DE LA ESTAC TF / B5182 ernance, Management and Posterior Individual Open - National 5,855.23 0.00 Firmado 9 18 27 20 03 20 20 10 17 IÓN CIENTÍFICA” en el Cent Monitoring ro experimental Amazónico CEA, según las cantidades, diseños y especificaciones plasmadas por CORPOAMA ZONIA. CO-PNF-368054-CS-INDV / Prestar sus servicios profes ionales para orientar la ges tión y el manejo de las áre Component 1 - Protected 2023-09-2 2023-06- 2023-10- 2023-06- 2023-10- 2023-07- 2023-11- 2023-08- 2024-10- as protegidas y otras áreas TF / B5182 Areas Management and Fi Posterior Individual Limited 19,363.76 0.00 Firmado 9 26 07 29 17 25 03 03 28 de importancia para la con nancial Sustainability servación en el marco de lo s planes de manejo, en juri sdicción de Corpoamazonia y áreas de intervención del proyecto. CO-PNF-368090-CS-INDV / Prestar sus servicios realiza ndo actividades de operari Component 2 - Forest Gov 2023-09-2 2023-06- 2023-10- 2023-06- 2023-10- 2023-07- 2023-11- 2023-07- 2025-03- o de la embarcación dispue TF / B5182 ernance, Management and Posterior Individual Direct - National 9,405.26 0.00 Firmado 9 23 19 27 26 07 12 17 06 sta para el desplazamiento Monitoring del equipo técnico de CORP OAMAZONIA en las áreas p riorizadas por la Iniciativa GEF. CO-PNF-368091-CS-INDV / Prestar sus servicios profes ionales adelantando las lab Component 2 - Forest Gov ores de campo requeridas 2023-09-2 2023-06- 2023-10- 2023-06- 2023-10- 2023-06- 2023-11- 2023-07- 2025-03- TF / B5182 ernance, Management and Posterior Individual Direct - National 17,261.79 0.00 Firmado para la concertación, el est 9 23 17 27 24 27 10 11 04 Monitoring ablecimiento y mantenimie nto de los sistemas de man ejo sostenibles en los núcle os de desarrollo forestal pri orizados por CORPOAMAZO CO-PNF-369200-CS-INDV / NIA Prestar sus servicios profes Component 4 - Project Coo ionales con el fin de realiza rdination, Management, M 2023-09-2 2023-06- 2023-10- 2023-06- 2023-10- 2023-06- 2023-11- 2023-07- 2024-07- r el análisis y la sistematiza TF / A5789 Posterior Individual Direct - National 12,909.17 0.00 Rescindido onitoring and Evaluation ( 9 27 11 28 18 30 04 17 01 ción de lecciones resultant M&E) es de las iniciativas de coo peración internacional, esp ecialmente de los proyecto s financiados por el GEF. CO-PNF-370803-CS-INDV / Prestar sus servicios perso nales como facilitador indíg ena, para apoyar la implem Component 1 - Protected 2023-09-2 2023-07- 2023-10- 2023-10- 2023-10- 2023-10- 2023-11- 2023-10- 2024-11- 2024-10- entación de los Acuerdos P TF / A5789 Areas Management and Fi Posterior Individual Limited 4,211.78 0.00 Finalizado 9 17 09 10 19 10 08 24 02 26 olíticos de Voluntades, en l nancial Sustainability a fase de construcción de u n mecanismo conjunto par a la articulación y coordina ción entre PNN y y El Puebl o Koreguaje CO-PNF-370806-CS-INDV / Prestar sus servicios perso nales como facilitador indíg ena, para apoyar la implem Component 1 - Protected 2023-09-2 2023-07- 2023-10- 2023-07- 2023-10- 2023-07- 2023-11- 2023-08- 2024-11- 2024-08- entación de los Acuerdos P TF / A5789 Areas Management and Fi Posterior Individual Limited 4,211.78 0.00 Finalizado 9 17 09 18 19 25 08 17 02 22 olíticos de Voluntades, en l nancial Sustainability a fase de construcción de u n mecanismo conjunto par a la articulación y coordina ción entre PNN y El Pueblo Siona. CO-PNF-370807-CS-INDV / Prestar sus servicios perso nales como facilitador indíg ena, para apoyar la implem Component 1 - Protected 2023-09-2 2023-07- 2023-10- 2023-07- 2023-10- 2023-07- 2023-11- 2023-08- 2024-11- entación de los Acuerdos P TF / A5789 Areas Management and Fi Posterior Individual Limited 4,211.78 0.00 Firmado 9 17 09 18 19 25 08 18 02 olíticos de Voluntades, en l nancial Sustainability a fase de construcción de u n mecanismo conjunto par a la articulación y coordina ción entre PNN y El Pueblo Kichwa. CO-PNF-370808-CS-INDV / Prestar sus servicios perso nales como enlace técnico i ndígena, para apoyar la im Component 1 - Protected 2023-09-2 2023-07- 2023-10- 2023-07- 2023-10- 2023-07- 2023-11- 2023-08- 2024-09- 2024-08- plementación de los Acuer TF / A5789 Areas Management and Fi Posterior Individual Limited 5,824.89 0.00 Finalizado 9 17 09 18 19 26 08 22 03 29 dos Políticos de Voluntades nancial Sustainability , en la fase de construcción de un mecanismo conjunto para la articulación y coord inación entre PNN y El Pue blo Kichwa. CO-PNF-370809-CS-INDV / Prestar sus servicios perso nales como facilitador indíg ena, para apoyar la implem Component 1 - Protected 2023-09-2 2023-07- 2023-10- 2023-07- 2023-10- 2023-07- 2023-11- 2023-08- 2024-11- 2024-08- entación de los Acuerdos P TF / A5789 Areas Management and Fi Posterior Individual Limited 4,211.78 0.00 Finalizado 9 17 09 18 19 26 08 22 02 24 olíticos de Voluntades, en l nancial Sustainability a fase de construcción de u n mecanismo conjunto par a la articulación y coordina ción entre PNN y Indígenas Murui, Muinan CO-PNF-370811-CS-INDV / Prestar sus servicios perso nales como técnico de enla ce indígena, para apoyar la Component 1 - Protected 2023-09-2 2023-07- 2023-10- 2023-07- 2023-10- 2023-07- 2023-11- 2023-08- 2024-09- 2024-06- implementación de los Acu TF / A5789 Areas Management and Fi Posterior Individual Limited 5,824.89 0.00 Finalizado 9 17 09 17 19 26 08 17 03 22 erdos Políticos de Voluntad nancial Sustainability es, en la fase de construcci ón de un mecanismo conju nto para la articulación y c oordinación entre PNN y los Indígenas Muru Page 15 CO-PNF-372286-CS-INDV / Prestar servicios de apoyo administrativos y operativo Component 2 - Forest Gov s requeridos en el seguimie 2023-09-2 2023-07- 2023-10- 2023-07- 2023-10- 2023-07- 2023-11- 2023-07- 2025-03- TF / B5182 ernance, Management and Posterior Individual Direct - National 15,645.91 0.00 Firmado nto a la planeación, progra 9 17 14 18 24 19 10 26 04 Monitoring mación y ejecución de las a ctividades, establecidas en el Plan de Adquisiciones y el Plan Operativo Anual a c argo de la CDA CO-PNF-375829-CS-INDV / Prestar sus servicios perso nales como facilitador local Component 1 - Protected para acompañar y apoyar l 2023-10-3 2023-08- 2023-11- 2023-08- 2023-11- 2023-08- 2023-12- 2023-08- 2024-07- 2024-04- TF / A5789 Areas Management and Fi Posterior Individual Limited 3,550.02 0.00 Finalizado os procesos orientados a la 1 10 10 14 20 17 10 31 07 04 nancial Sustainability implementación del Plan d e Manejo del Parque Natur al Regional Miraflores Picac hos en la región de Santan a Ramos. CO-PNF-375834-CS-INDV / Prestar servicios profesiona les para recopilar, analizar Component 1 - Protected y generar información geog 2023-10-3 2023-08- 2023-11- 2023-08- 2023-11- 2023-08- 2023-12- 2023-08- 2024-08- 2024-04- TF / A5789 Areas Management and Fi Posterior Individual Direct - National 14,753.34 0.00 Finalizado ráfica y documental del Par 1 10 20 10 27 14 14 22 10 24 nancial Sustainability que Nacional Natural Serra nía de Chiribiquete que ser virá de insumo para la gest ión, manejo y monitoreo de l área protegida. CO-PNF-375840-CS-INDV / Prestar servicios profesiona les con el fin de apoyar los Component 2 - Forest Gov 2023-10-3 2023-08- 2023-11- 2023-08- 2023-11- 2023-08- 2023-12- 2023-08- 2025-03- procesos administrativos, o TF / B5182 ernance, Management and Posterior Individual Direct - National 17,289.07 0.00 Firmado 1 10 20 10 27 11 14 17 08 perativos requeridos para e Monitoring l seguimiento a la ejecució n de las actividades a carg o de Corpoamazonia en el proyecto. CO-PNF-375844-CS-INDV / Prestar sus servicios profes ionales para orientar técnic amente los procesos de art Component 2 - Forest Gov 2023-10-3 2023-08- 2023-11- 2023-08- 2023-11- 2023-08- 2023-12- 2023-08- 2025-03- iculación institucional y con TF / B5182 ernance, Management and Posterior Individual Direct - National 34,163.21 0.00 Firmado 1 10 20 14 28 16 15 24 09 certación social requeridos Monitoring para la aplicación de prácti cas de manejo sostenible d el paisaje, bajo enfoque de manejo forestal y de restau ración. CO-PNF-375848-CS-INDV / Prestar sus servicios perso nales como facilitador local Component 1 - Protected para acompañar y apoyar l 2023-10-3 2023-08- 2023-11- 2023-08- 2023-11- 2023-08- 2023-12- 2023-09- 2024-07- 2024-04- TF / B5182 Areas Management and Fi Posterior Individual Limited 3,550.02 0.00 Finalizado os procesos orientados a la 1 10 10 12 20 17 10 01 07 05 nancial Sustainability implementación del Plan d e Manejo Ambiental del Par que Natural Regional Mirafl ores Picachos en Florencia y Doncello. CO-PNF-375855-CS-INDV / Prestar sus servicios perso nales como facilitador local acompañando y apoyando l Component 1 - Protected 2023-10-3 2023-08- 2023-11- 2023-08- 2023-11- 2023-08- 2023-12- 2023-08- 2024-07- 2024-04- os procesos orientados a la TF / B5182 Areas Management and Fi Posterior Individual Limited 3,550.02 0.00 Finalizado 1 10 10 13 20 16 10 31 07 05 implementación del Plan d nancial Sustainability e Manejo del Parque Natur al Regional Miraflores Picac hos en la región de Pato Ba lsillas, con la participación y diálogo. CO-PNF-375863-CS-INDV / Prestar sus servicios profes ionales para apoyar jurídica Component 2 - Forest Gov mente los procesos para la 2023-10-3 2023-09- 2023-11- 2023-09- 2023-11- 2023-09- 2023-12- 2023-10- 2024-11- TF / B5182 ernance, Management and Posterior Individual Limited 12,448.13 0.00 Firmado aplicación de prácticas de 1 19 10 21 17 28 04 10 28 Monitoring manejo forestal sostenible en bosque natural, en las á reas priorizadas por CORPO AMAZONIA en el marco del proyecto. CO-PNF-375866-CS-INDV / Prestar sus servicios profes ionales para realizar activid ades enmarcadas en el apo Component 2 - Forest Gov 2023-10-3 2023-09- 2023-11- 2023-11- 2023-12- 2024-12- yo a la ejecución de accion TF / B5182 ernance, Management and Posterior Individual Direct - National 11,341.63 0.00 Cancelado 1 29 20 27 14 08 es programadas por CORP Monitoring OAMAZONIA y Parques Nac ionales Naturales para la pr evención, vigilancia y contr ol de las presiones y amen azas. CO-PNF-365922-CS-INDV / Prestar sus servicios profes ionales para liderar la gesti ón de procesos de participa Component 2 - Forest Gov 2023-09-2 2023-10- 2023-10- 2023-11- 2024-10- ción, concertación y fortale TF / B5182 ernance, Management and Posterior Individual Direct - National 17,796.21 0.00 Cancelado 9 09 16 02 27 cimiento de capacidades c Monitoring on las comunidades y orga nizaciones locales para el manejo y uso sostenible de los bosques y el agua y la g obernanza. CO-PNF-378716-CS-INDV / Prestar sus servicios como facilitador técnico para apo Component 3 - Sectoral Pr yar en el desarrollo de acti 2023-09-2 2023-08- 2023-10- 2023-09- 2023-10- 2023-09- 2023-11- 2023-09- 2024-11- 2024-10- TF / A5789 ograms for Sustainable La Posterior Individual Limited 8,713.69 0.00 Finalizado vidades de campo y oficina 9 25 09 01 19 15 08 26 02 01 ndscape Management para el inventario forestal d e los predios asociados al N úcleo de Desarrollo Foresta l – en el área priorizada de Caño Jota. CO-PNF-378718-CS-INDV / Prestar sus servicios como facilitar local el desarrollo d Component 3 - Sectoral Pr 2023-09-2 2023-08- 2023-10- 2023-09- 2023-10- 2023-09- 2023-11- 2023-10- 2024-11- 2024-10- e actividades de campo par TF / A5789 ograms for Sustainable La Posterior Individual Limited 5,532.50 0.00 Finalizado 9 25 09 01 19 15 08 02 02 04 a el inventario forestal de l ndscape Management os predios asociados al ND F Caño Jota del Sitio Ramsa r Estrella Fluvial Inírida, de partamento de Guainía. CO-PNF-378719-CS-INDV / Prestar sus servicios como Facilitador Local en el desa rrollo de actividades de ca Component 3 - Sectoral Pr 2023-09-2 2023-08- 2023-10- 2023-09- 2023-10- 2023-09- 2023-11- 2023-09- 2024-11- mpo para el inventario fore TF / A5789 ograms for Sustainable La Posterior Individual Limited 5,532.50 0.00 Rescindido 9 25 09 01 19 14 08 26 02 stal de los predios asociado ndscape Management s al Núcleo de Desarrollo F orestal - NDF La Rompida d el Sitio Ramsar Estrella Flu vial Inírida, departamento de Guainía CO-PNF-378720-CS-INDV / Prestar sus servicios como Facilitador Técnico para ap Component 3 - Sectoral Pr oyar en el desarrollo de act 2023-09-2 2023-08- 2023-10- 2023-09- 2023-10- 2023-09- 2023-11- 2023-09- 2024-11- 2024-10- TF / A5789 ograms for Sustainable La Posterior Individual Limited 8,713.69 0.00 Finalizado ividades de campo y oficin 9 25 09 01 19 15 08 26 02 01 ndscape Management a para el inventario forestal de los predios asociados al Núcleo de Desarrollo Forest al - NDF La Rompida del Sit io Ramsar Estrella Fluvial In CO-PNF-378722-CS-INDV / írida. Prestar sus servicios profes ionales para orientar la imp Component 1 - Protected lementación de la Estrategi 2023-09-2 2023-08- 2023-10- 2023-09- 2023-10- 2023-09- 2023-11- 2023-09- 2024-12- 2024-11- TF / A5789 Areas Management and Fi Posterior Individual Direct - National 25,011.07 0.00 Finalizado a de Prevención y Gestión 9 25 14 04 21 13 07 26 01 29 nancial Sustainability de riesgo de vulneraciones a los Derechos Humanos e infracciones al Derecho Int ernacional Humanitario del Proyecto. CO-PNF-375842-CS-INDV / Prestar servicios profesiona les de apoyo administrativo Component 2 - Forest Gov requeridos en el seguimien 2023-09-0 2023-08- 2023-09- 2023-09- 2023-09- 2023-09- 2023-09- 2023-09- 2024-11- TF / B5182 ernance, Management and Posterior Individual Direct - National 12,263.72 0.00 Firmado to a la planeación, program 5 25 11 04 14 13 26 26 19 Monitoring ación y ejecución de las act ividades, establecidas en el Plan de Adquisiciones y el P lan Operativo Anual a carg o de CORPOAMAZONIA. CO-PNF-384194-CS-INDV / Prestar sus servicios profes ionales para apoyar a la Co rporación para el Desarroll Component 3 - Sectoral Pr 2023-10-1 2023-09- 2023-10- 2023-10- 2023-10- 2023-10- 2023-11- 2023-10- 2024-11- o Sostenible del Norte y Ori TF / B5182 ograms for Sustainable La Posterior Individual Direct - National 18,724.76 0.00 Firmado 6 29 23 02 25 03 06 11 30 ente Amazónico – CDA, en l ndscape Management a generación de insumos, s oportes y conceptos técnic os para la toma de decision es en relación con la gestió n ambiental. CO-PNF-384206-CS-INDV / Apoyar la actualización y c onsolidación de informació Component 3 - Sectoral Pr n geográfica necesaria par 2023-10-3 2023-09- 2023-11- 2023-11- 2023-12- 2023-11- 2023-12- 2023-11- 2024-06- TF / B5182 ograms for Sustainable La Posterior Individual Open - National 8,298.76 0.00 Firmado a la caracterización de la di 1 29 26 01 03 01 20 10 17 ndscape Management námica de accesibilidad y l a deforestación en áreas pr iorizadas por el Sistema de Monitoreo de Bosques y Ca rbono del IDEAM CO-PNF-384208-CS-INDV / Prestar sus servicios como Facilitador Local para apoy Component 1 - Protected 2023-10-3 2023-10- 2023-11- 2023-10- 2023-11- 2023-10- 2023-11- 2023-10- 2024-11- ar las actividades que per TF / B5182 Areas Management and Fi Posterior Individual Limited 4,487.97 0.00 Firmado 1 02 05 02 12 06 29 20 23 mitan la implementación d nancial Sustainability e las actividades de Restau ración en la RNN Nukak (se ctor de Miraflores), en el m arco del proyecto. CO-PNF-384213-CS-INDV / Prestar sus servicios como Facilitador Técnico para la i Component 1 - Protected 2023-10-3 2023-10- 2023-11- 2023-10- 2023-11- 2023-10- 2023-11- 2023-10- 2024-11- mplementación de las activ TF / B5182 Areas Management and Fi Posterior Individual Limited 7,410.90 0.00 Firmado 1 02 05 02 12 06 29 17 23 idades de restauración ecol nancial Sustainability ógica en la RNN Nukak - se ctor de Miraflores - Bacatí, en el marco del proyecto CO-PNF-384214-CS-INDV / Prestar sus servicios profes ionales para orientar la pla Component 1 - Protected 2023-10-1 2023-09- 2023-11- 2023-11- 2023-11- 2023-11- 2023-12- 2023-11- 2024-11- nificación, concertación, im TF / B5182 Areas Management and Fi Posterior Individual Open - National 14,844.81 0.00 Firmado 6 29 08 17 15 17 02 27 26 plementación y seguimient nancial Sustainability o de actividades de Restau ración en la Reserva Nacio nal Natural (RNN) NUKAK, e n el marco del proyecto. CO-PNF-384217-CS-INDV / Prestar sus servicios como Facilitador Indígena para a Component 1 - Protected poyar operativamente las a 2023-10-3 2023-11- 2023-11- 2023-11- 2023-11- 2023-11- 2023-11- 2023-12- 2024-06- TF / B5182 Areas Management and Fi Posterior Individual Limited 2,278.47 0.00 Firmado ctividades de prevención, v 1 09 05 20 12 28 29 13 26 nancial Sustainability igilancia y control del Parqu e Nacional Natural Alto Fra gua Indi Wasi y su relacion amiento con el pueblo Inga del departamento del Caqu CO-PNF-384219-CS-INDV / etá Prestar sus servicios como facilitador indígena para ap Component 1 - Protected 2023-10-3 2023-11- 2023-11- 2023-11- 2023-11- 2023-11- 2023-11- 2023-12- 2024-05- oyar operativamente las ac TF / B5182 Areas Management and Fi Posterior Individual Limited 1,952.97 0.00 Firmado 1 09 05 20 12 29 29 29 27 tividades de gobernanza d nancial Sustainability el Parque Nacional Natural Alto Fragua Indi Wasi segú n los lineamientos instituci onales. CO-PNF-384269-CS-INDV / Prestar sus servicios perso nales para mantener el arc Component 1 - Protected hivo de manera digital y fís 2023-10-1 2023-10- 2023-11- 2023-10- 2023-11- 2023-10- 2023-12- 2023-10- 2024-11- TF / A5789 Areas Management and Fi Posterior Individual Open - National 4,426.00 0.00 Rescindido ica de procesos de adquisic 6 04 11 24 18 24 05 27 29 nancial Sustainability iones adelantados en el ma rco de la ejecución del Proy ecto “Conservación de Bos ques y Sostenibilidad en el Corazón de la Amazonía”. CO-PNF-384280-CS-INDV / Prestar servicios profesiona les para liderar la declarato Component 1 - Protected 2023-10-1 2023-09- 2023-10- 2023-10- 2023-10- 2023-10- 2023-11- 2023-10- 2024-11- ria, gestión y manejo de las TF / B5182 Areas Management and Fi Posterior Individual Direct - National 19,260.86 0.00 Firmado 6 29 20 02 22 04 06 17 30 áreas protegidas y otros ec nancial Sustainability osistemas estratégicos del Sistema Nacional de Áreas Protegidas -SINAP, prioriza dos por la CDA. CO-PNF-384430-CS-INDV / Prestar sus servicios profes ionales para realizar el aco mpañamiento en la formul Component 2 - Forest Gov 2023-10-3 2023-09- 2023-11- 2023-10- 2023-11- 2023-10- 2023-11- 2023-11- 2024-10- ación de los insumos técnic TF / B5182 ernance, Management and Posterior Individual Limited 13,946.52 0.00 Firmado 1 29 05 03 12 20 29 02 24 os requeridos para adelant Monitoring ar las contrataciones y gest ionar el apoyo en el seguim iento operativo de los proc esos de manejo forestal y r estauración. CO-PNF-386428-CS-INDV / Prestar sus servicios profes ionales para orientar y hac Component 1 - Protected 2023-10-3 2023-10- 2023-11- 2023-10- 2023-11- 2023-10- 2023-11- 2023-11- 2024-09- 2024-11- er seguimiento a la aplicaci TF / A5789 Areas Management and Fi Posterior Individual Limited 11,794.87 0.00 Finalizado 1 12 05 19 12 27 29 07 24 09 ón de los instrumentos de s nancial Sustainability alvaguardas sociales del pr oyecto GEF Corazón de la A mazonia con su respectivo proceso documental. CO-PNF-386431-CS-INDV / Prestar servicios profesiona les para apoyar el proceso Component 4 - Project Coo de actualización del Plan d rdination, Management, M 2023-10-3 2023-10- 2023-11- 2023-11- 2023-12- 2023-11- 2023-12- 2023-11- 2024-11- TF / A5789 Posterior Individual Open - National 11,282.05 0.00 Rescindido e Acción de Biodiversidad d onitoring and Evaluation ( 1 12 26 17 03 17 20 27 14 e acuerdo al Marco Global M&E) de Biodiversidad Kunming- Montreal y en el marco del proyecto Corazón de la Am azonia. CO-PNF-386432-CS-INDV / Prestar sus servicios profes ionales con el fin de realiza r labores de apoyo requerid Component 2 - Forest Gov 2023-10-3 2023-10- 2023-11- 2023-10- 2023-11- 2023-10- 2023-12- 2023-11- 2024-11- as para el establecimiento TF / B5182 ernance, Management and Posterior Individual Direct - National 14,400.00 0.00 Firmado 1 12 10 13 17 17 04 03 28 y el seguimiento técnico en Monitoring campo a sistemas de produ cción sostenible de usuario s del Proyecto Conservació n de Bosques y Sostenibilid ad. CO-PNF-386433-CS-INDV / Prestar sus servicios perso nales apoyando las activida Component 1 - Protected des operativas y logísticas 2023-10-3 2023-10- 2023-11- 2023-10- 2023-11- 2023-10- 2023-11- 2023-11- 2024-09- TF / B5182 Areas Management and Fi Posterior Individual Limited 4,615.38 0.00 Firmado que se requieran en el mar 1 12 05 12 12 26 29 10 24 nancial Sustainability co del Plan de Trabajo acor dado con la Mesa Ramsar E FI y las entidades socias de l Proyecto GEF Corazón de l a Amazonia. CO-PNF-386434-CS-INDV / Prestar sus servicios profes ionales para apoyar la gesti ón del Ministerio de Ambie Component 1 - Protected 2023-10-3 2023-10- 2023-11- 2023-12- 2023-12- 2023-12- 2023-12- 2023-12- 2024-08- nte y Desarrollo Sostenible TF / B5182 Areas Management and Fi Posterior Individual Open - National 12,307.69 0.00 Firmado 1 12 26 01 03 01 20 15 16 en la consolidación del sitio nancial Sustainability Ramsar Estrella Fluvial Iníri da (EFI), en el marco de la i mplementación del proyect o GEF Corazón de la Amazo nia. CO-PNF-391521-CS-INDV / Prestar sus servicios como facilitador Local campesino de Uso, Ocupación y Tenen Component 1 - Protected 2023-11-3 2023-11- 2023-12- 2023-11- 2023-12- 2023-11- 2023-12- 2023-12- 2024-11- 2024-11- cia - UOT, facilitando el diál TF / A5789 Areas Management and Fi Posterior Individual Limited 7,126.97 0.00 Finalizado 0 15 05 20 12 29 29 11 23 13 ogo y relacionamiento con l nancial Sustainability as comunidades campesina s y estructuras organizativ as, apoyando la construcci ón de rutas de trabajo, pla nes operativos CO-PNF-391533-CS-INDV / Prestar sus servicios profes ionales para el acompañam Component 3 - Sectoral Pr iento técnico y asesoría en 2023-11-3 2023-11- 2023-12- 2023-11- 2023-12- 2023-12- 2024-01- 2023-12- 2024-11- TF / B5182 ograms for Sustainable La Posterior Individual Limited 18,897.44 0.00 Firmado la incorporación de criterio 0 10 08 15 18 01 04 06 29 ndscape Management s ambientales durante la pl anificación de los proyecto s de infraestructura en los municipios no contemplado s en los Planes de Desarroll CO-PNF-391534-CS-INDV / o. Prestar sus servicios profes ionales para orientar la con Component 2 - Forest Gov strucción y desarrollo de u 2023-11-3 2023-11- 2023-12- 2023-12- 2024-01- 2024-11- TF / B5182 ernance, Management and Posterior Individual Limited 11,282.05 0.00 Cancelado na estrategia de difusión y 0 10 08 18 04 29 Monitoring comunicación para fortalec er la gobernanza y la aprop iación de los diferente acto res locales e institucionales que participan en la ejecuci CO-PNF-391537-CS-INDV / ón. Prestar sus servicios profes ionales para acompañar, br Component 2 - Forest Gov indar asistencia técnica y a 2023-11-3 2023-12- 2023-12- 2023-12- 2023-12- 2023-12- 2024-01- 2023-12- 2024-11- TF / B5182 ernance, Management and Posterior Individual Limited 11,282.05 0.00 Firmado poyar los procesos orientad 0 07 08 12 15 14 01 27 26 Monitoring os a la implementación de l a forestería comunitaria en los Núcleos de Desarrollo F orestal y de la Biodiversida d - NDFyB en el Bajo Caguá CO-PNF-391538-CS-INDV / n. Realizar la Interventoría de la obra menor denominada ADECUACIÓN DE LAS INST Component 1 - Protected 2023-12-2 2023-11- 2024-01- 2024-02- 2024-02- 2024-06- ALACIONES FISICAS EN LA TF / B5182 Areas Management and Fi Posterior Individual Open - National 2,564.10 0.00 Cancelado 9 22 26 02 10 09 UNIDAD OPERATIVA DE CO nancial Sustainability RPOAMAZONIA UBICADA E N LA INSPECCIÓN DE GUAY ABAL MUNICIPIO DE SAN VI CENTE DEL CAGUAN, DEPA RTAMENTO DEL CAQUETA”. CO-PNF-391560-CS-INDV / Prestar sus servicios profes ionales para apoyar en la g eneración de sustentos y c Component 3 - Sectoral Pr 2023-11-3 2023-11- 2023-12- 2023-12- 2023-12- 2023-12- 2024-01- 2024-01- 2024-11- onceptos técnicos relacion TF / B5182 ograms for Sustainable La Posterior Individual Open - National 17,641.03 0.00 Firmado 0 10 23 22 30 22 16 12 11 ados con la gestión ambien ndscape Management tal de proyectos de constru cción o intervención de infr aestructura de transporte, en la jurisdicción de Corpoa mazonia. CO-PNF-391561-CS-INDV / Prestar sus servicios perso nales como facilitador local para apoyar a ASOJUNTAS Component 2 - Forest Gov 2023-11-3 2023-11- 2023-12- 2023-11- 2023-12- 2023-11- 2023-12- 2023-11- 2024-11- Charras Boquerón- Sector TF / B5182 ernance, Management and Posterior Individual Limited 7,333.33 0.00 Firmado 0 15 05 16 12 20 29 29 23 Boquerón, en el desarrollo Monitoring de las actividades de exten sión rural requeridas para e l establecimiento y acompa ñamiento de los acuerdos d e conservación. CO-PNF-391562-CS-INDV / Prestar sus servicios perso nales como facilitador local para apoyar a ASOJUNTAS Component 2 - Forest Gov 2023-11-3 2023-11- 2023-12- 2023-11- 2023-12- 2023-11- 2023-12- 2023-11- 2024-11- Charras Boquerón- Sector TF / B5182 ernance, Management and Posterior Individual Limited 7,333.33 0.00 Firmado 0 15 05 16 12 21 29 29 23 Charras, en el desarrollo de Monitoring las actividades de extensió n rural requeridas para el e stablecimiento y acompaña miento de los acuerdos de conservación. CO-PNF-395436-CS-INDV / Prestar sus servicios como profesional social para reali Component 2 - Forest Gov zar el proceso de concertac 2023-12-2 2023-12- 2024-01- 2023-12- 2024-01- 2023-12- 2024-01- 2024-01- 2024-11- TF / B5182 ernance, Management and Posterior Individual Limited 10,256.41 0.00 Rescindido ión y participación requerid 9 01 06 16 13 28 30 05 25 Monitoring o en la implementación de los Núcleos de desarrollo fo restal y de la Biodiversidad NDFyB y la implementación de la restauración. Page 16 CO-PNF-395440-CS-INDV / Prestar sus servicios como Facilitador Local para apoy Component 1 - Protected ar las actividades que per 2023-12-2 2023-12- 2024-01- 2023-12- 2024-01- 2023-12- 2024-01- 2023-12- 2024-11- TF / B5182 Areas Management and Fi Posterior Individual Limited 4,160.00 0.00 Firmado mitan la implementación d 9 01 03 04 10 14 27 22 22 nancial Sustainability e las actividades de Restau ración en la RNN Nukak (se ctor de Alto Inírida), en el marco del proyecto GEF – C orazón de la Amazonía. CO-PNF-395445-CS-INDV / Prestar sus servicios como Facilitador Técnico para ap Component 1 - Protected oyar la implementación de 2023-12-2 2023-12- 2024-01- 2023-12- 2024-01- 2023-12- 2024-01- 2023-12- 2024-11- TF / B5182 Areas Management and Fi Posterior Individual Limited 6,869.33 0.00 Firmado las actividades de restaura 9 01 03 04 10 14 27 20 22 nancial Sustainability ción ecológica en la RNN N ukak - sector de Alto Inírida , municipio de El Retorno, e n el marco del proyecto GE F. CO-PNF-395487-CS-INDV / Prestar servicios profesiona les para apoyar a la Corpor ación Autónoma Regional d Component 3 - Sectoral Pr 2023-12-2 2023-12- 2024-01- 2023-12- 2024-01- 2023-12- 2024-02- 2023-12- 2024-10- el Cauca - CRC, en el acom TF / B5182 ograms for Sustainable La Posterior Individual Direct - National 12,800.00 0.00 Firmado 9 01 11 05 18 05 04 13 01 pañamiento y asistencia té ndscape Management cnica a los municipios oblig ados al cumplimiento de la orden 3 de la Sentencia 43 60 de 2018 y a la impleme ntación. CO-PNF-397071-CS-INDV / Prestar servicios profesiona les como enlace técnico y j urisdiccional en la Corporac Component 2 - Forest Gov 2023-12-2 2023-12- 2024-01- 2023-12- 2024-01- 2023-12- 2024-02- 2023-12- 2024-11- ión para el Desarrollo Soste TF / B5182 ernance, Management and Posterior Individual Direct - National 18,666.67 0.00 Firmado 2 13 09 18 17 20 03 29 29 nible del Norte y el Oriente Monitoring Amazónico - CDA para la ej ecución de las líneas de ac ción que tiene a cargo la C orporación en el marco del proyecto CO-PNF-397073-CS-INDV / Acompañar las actividades de Prevención y Vigilancia definidas por el Santuario d Component 1 - Protected 2023-12-2 2023-12- 2024-01- 2023-12- 2024-01- 2023-12- 2024-01- 2024-01- 2024-07- e Flora Plantas Medicinales TF / B5182 Areas Management and Fi Posterior Individual Limited 2,246.40 0.00 Firmado 9 13 03 14 10 27 27 05 25 Orito Ingi Ande en su proto nancial Sustainability colo de PVyC y apoyar el re lacionamiento y articulació n con las autoridades y la c omunidad de los Resguard os Santa Rosa CO-PNF-397075-CS-INDV / Acompañar las actividades de Prevención y Vigilancia definidas por el Santuario d Component 1 - Protected 2023-12-2 2023-12- 2024-01- 2023-12- 2024-01- 2023-12- 2024-01- 2024-01- 2024-07- e Flora Plantas Medicinales TF / B5182 Areas Management and Fi Posterior Individual Limited 2,246.40 0.00 Firmado 9 13 03 14 10 27 27 05 25 Orito Ingi Ande – SFPM OIA nancial Sustainability - en su protocolo de PVyC y apoyar el relacionamiento y articulación con las vered as campesinas de la Zona c on Función CO-PNF-397077-CS-INDV / Prestar sus servicios profes ionales (PDI1) para generar Alertas Tempranas de Defo Component 2 - Forest Gov 2023-12-2 2023-12- 2024-01- 2024-01- 2024-01- 2024-01- 2024-02- 2024-01- 2024-11- restación e información te TF / A5789 ernance, Management and Posterior Individual Open - National 19,230.77 0.00 Rescindido 2 13 11 15 18 15 04 22 30 mática de monitoreo de la Monitoring superficie de bosque y defo restación a nivel nacional y /o regional como insumo p ara la consolidación de cifr as oficiales. CO-PNF-397074-CS-INDV / Prestar sus servicios perso nales como Facilitador Indí Component 1 - Protected gena realizando el acompa 2023-12-2 2023-12- 2024-01- 2023-12- 2024-01- 2023-12- 2024-01- 2024-01- 2024-07- TF / B5182 Areas Management and Fi Posterior Individual Limited 2,246.40 0.00 Firmado ñamiento al Santuario de Fl 9 13 03 14 10 27 27 22 25 nancial Sustainability ora Plantas Medicinales Ori to Ingi Ande en la línea de PVyC mediante el relaciona miento y articulación con la s autoridades y la comunid CO-PNF-397066-CS-INDV / ad. Prestar sus servicios profes ionales como enlace institu cional en la gestión, planea Component 2 - Forest Gov 2023-12-2 2023-12- 2024-01- 2023-12- 2024-01- 2023-12- 2024-02- 2023-12- 2024-11- ción y seguimiento operati TF / B5182 ernance, Management and Posterior Individual Direct - National 28,205.13 0.00 Firmado 2 14 09 14 17 20 03 29 29 vo para la implementación Monitoring del Componente 2. Manejo y uso sostenible de los bos ques y el agua, en congrue ncia con los marcos metod ológicos. CO-PNF-400675-CS-INDV / Prestar sus servicios profes ionales para el desarrollo g Component 1 - Protected 2024-01-3 2024-01- 2024-02- 2024-01- 2024-02- 2024-01- 2024-03- 2024-01- 2024-11- 2024-11- ráfico y editorial de la ident TF / A5789 Areas Management and Fi Posterior Individual Direct - National 22,465.38 0.00 Finalizado 0 10 09 12 16 16 04 24 29 28 idad visual y posicionamien nancial Sustainability to del proyecto CONSERVA CIÓN DE BOSQUES Y SOST ENIBILIDAD EN EL CORAZO N DE LA AMAZONIA. CO-PNF-400679-CS-INDV / Prestar servicios técnicos y de apoyo con el fin de adel Component 1 - Protected antar acciones en torno a p 2024-03-2 2024-01- 2024-04- 2024-01- 2024-04- 2024-01- 2024-05- 2024-02- 2024-10- 2024-11- TF / A5789 Areas Management and Fi Posterior Individual Direct - National 4,480.00 0.00 Finalizado rocesos de ordenamiento p 9 10 08 12 15 23 02 12 29 13 nancial Sustainability redial y seguimiento a los p rocesos de restauración ec ológica, con las familias pri orizadas de las veredas Pu erto Cubarro, La Cristalina. CO-PNF-400680-CS-INDV / Prestar los servicios profesi onales para la creación y ej Component 2 - Forest Gov 2024-01-3 2024-01- 2024-02- 2024-02- 2024-02- 2024-11- ecución de una estrategia TF / A5789 ernance, Management and Posterior Individual Limited 20,307.69 0.00 Cancelado 0 15 04 11 28 24 de comunicaciones que per Monitoring mita fortalecer el posiciona miento del Sistema de Mon itoreo de Bosques y Carbon o del Ideam. CO-PNF-400683-CS-INDV / Prestar sus servicios como Facilitador Local Operativo Component 1 - Protected para apoyar acciones de m 2024-01-3 2024-01- 2024-02- 2024-01- 2024-02- 2024-01- 2024-02- 2024-01- 2024-11- 2024-10- TF / A5789 Areas Management and Fi Posterior Individual Limited 3,840.00 0.00 Finalizado onitoreo y seguimiento a la 0 10 04 14 11 19 28 29 24 31 nancial Sustainability s implementaciones de Res tauración ecológica en el R esguardo indígena El Itilla, traslapado con el PNN Serr anía de Chiribiquete. CO-PNF-400685-CS-INDV / Prestar sus servicios profes ionales para apoyar a la co Component 4 - Project Coo ordinación del SMBYC y a l rdination, Management, M 2024-01-3 2024-01- 2024-02- 2024-01- 2024-02- 2024-01- 2024-03- 2024-01- 2024-11- TF / B5182 Posterior Individual Direct - National 23,179.49 0.00 Firmado a Subdirección de Ecosiste onitoring and Evaluation ( 0 10 09 11 16 15 04 19 29 mas e Información Ambient M&E) al del IDEAM en las activida des de seguimiento y moni toreo administrativo, financ iero y de planeación. CO-PNF-400687-CS-INDV / Prestar sus servicios profes ionales para apoyar la gen Component 4 - Project Coo eración de información tem rdination, Management, M 2024-01-3 2024-01- 2024-02- 2024-01- 2024-02- 2024-01- 2024-03- 2024-01- 2024-11- TF / B5182 Posterior Individual Direct - National 19,889.74 0.00 Firmado ática de monitoreo de alert onitoring and Evaluation ( 0 10 09 12 16 15 04 22 29 as tempranas de deforesta M&E) ción y minería ilegal en áre as de interés de la Direcció n Territorial Amazonia -DTA M. CO-PNF-400690-CS-INDV / Prestar servicios profesiona les para apoyar a CORPOA MAZONIA, territorial Caque Component 3 - Sectoral Pr 2024-01-3 2024-01- 2024-02- 2024-01- 2024-02- 2024-01- 2024-03- 2024-01- 2024-11- tá, en el acompañamiento TF / B5182 ograms for Sustainable La Posterior Individual Direct - National 16,000.00 0.00 Firmado 0 10 09 11 16 16 04 24 29 y asistencia técnica a los m ndscape Management unicipios obligados al cump limiento de la orden 3 de la Sentencia 4360 de 2018 y a la implementación del Co npes 4021 de 2020 CO-PNF-400698-CS-INDV / Prestar sus servicios perso nales como facilitador local Component 2 - Forest Gov para el acompañamiento té 2024-01-3 2024-01- 2024-02- 2024-01- 2024-02- 2024-01- 2024-02- 2024-02- 2024-11- TF / B5182 ernance, Management and Posterior Individual Limited 4,615.38 0.00 Firmado cnico y apoyar los procesos 0 12 04 20 11 29 28 16 24 Monitoring de seguimiento a la imple mentación de los Acuerdos de Conservación, restaurac ión y no deforestación con l a participación y diálogo. CO-PNF-400713-CS-INDV / Prestar sus servicios como técnico de apoyo en los pro cesos para la aplicación de Component 2 - Forest Gov 2024-01-3 2024-01- 2024-02- 2024-01- 2024-02- 2024-02- 2024-02- 2024-02- 2024-11- prácticas de manejo forest TF / B5182 ernance, Management and Posterior Individual Limited 6,923.08 0.00 Firmado 0 15 04 25 11 05 28 15 24 al sostenible en las áreas t Monitoring errestres priorizadas por C ORPOAMAZONIA, específic amente en la implementaci ón del Núcleo de la Econo mía Forestal. CO-PNF-400726-CS-INDV / Prestar sus servicios profes ionales para apoyar a la Co rporación para el Desarroll Component 2 - Forest Gov 2024-01-3 2024-01- 2024-02- 2024-01- 2024-02- 2024-01- 2024-03- 2024-01- 2024-11- o Sostenible del Norte y Ori TF / B5182 ernance, Management and Posterior Individual Direct - National 12,820.51 0.00 Firmado 0 10 09 12 16 16 04 22 29 ente Amazónico – CDA en l Monitoring a generación, interpretació n, procesamiento y análisis de datos e información geo espacial, para la toma de d ecisiones. CO-PNF-400728-CS-INDV / Prestar servicios técnicos y de apoyo a procesos de ord Component 1 - Protected enamiento predial y segui 2024-03-2 2024-04- 2024-04- 2024-05- 2024-10- TF / A5789 Areas Management and Fi Posterior Individual Direct - National 4,480.00 0.00 Cancelado miento a los procesos de re 9 08 15 02 29 nancial Sustainability stauración ecológica, con l as familias priorizadas de l as veredas Puerto Polaco, Caño Caribe y La Tigrera - Municipio de Calamar, Gua CO-PNF-400691-CS-INDV / viare. Prestar servicios profesiona les para apoyar Corpoamaz onia, territorial Putumayo, Component 3 - Sectoral Pr 2024-01-3 2024-01- 2024-02- 2024-01- 2024-02- 2024-01- 2024-03- 2024-01- 2024-11- en el acompañamiento y as TF / B5182 ograms for Sustainable La Posterior Individual Direct - National 16,000.00 0.00 Firmado 0 10 09 15 16 18 04 29 29 istencia técnica a los munic ndscape Management ipios obligados al cumplimi ento de la orden 3 de la Se ntencia 4360 de 2018 y a l a implementación del Conp es 4021 de 2020 CO-PNF-400729-CS-INDV / Prestar servicios técnicos y de apoyo a procesos de ord Component 1 - Protected enamiento predial y segui 2024-03-2 2024-01- 2024-04- 2024-01- 2024-04- 2024-01- 2024-05- 2024-02- 2024-10- 2024-08- TF / B5182 Areas Management and Fi Posterior Individual Direct - National 4,480.00 0.00 Finalizado miento a los procesos de re 9 10 08 11 15 22 02 07 29 08 nancial Sustainability stauración ecológica, con l as familias priorizadas de l as veredas Puerto Polaco, Caño Caribe y La Tigrera - Municipio de Calamar, Gua CO-PNF-405694-CS-INDV / viare. Prestar sus servicios profes ionales como enlace jurídic Component 4 - Project Coo o experto en normatividad rdination, Management, M 2024-02-2 2024-02- 2024-03- 2024-03- 2024-03- 2024-03- 2024-04- 2024-04- 2024-11- 2024-11- forestal, para apoyar a la D TF / A5789 Posterior Individual Open - National 25,641.03 0.00 Finalizado onitoring and Evaluation ( 3 14 11 22 18 22 04 04 30 30 irección de Bosques, Biodiv M&E) ersidad y Servicios Ecosisté micos del Minambiente, en el análisis crítico, interpret ación, aplicación y actualiz ación. CO-PNF-405696-CS-INDV / Prestar sus servicios profes ionales como enlace territo Component 4 - Project Coo rial experto en manejo fore rdination, Management, M 2024-02-2 2024-02- 2024-03- 2024-03- 2024-04- 2024-11- TF / A5789 Posterior Individual Open - National 25,641.03 0.00 Cancelado stal sostenible, para apoyar onitoring and Evaluation ( 3 08 11 18 04 30 a la Dirección de Bosques, M&E) Biodiversidad y Servicios E cosistémicos del Minambie nte, en la orientación técni ca y el seguimiento. CO-PNF-405700-CS-INDV / Prestar sus servicios profes ionales para apoyar la Dire Component 4 - Project Coo cción de Bosques, Biodiver rdination, Management, M 2024-02-2 2024-03- 2024-03- 2024-04- 2024-03- 2024-04- 2024-04- 2024-05- 2024-11- TF / A5789 Posterior Individual Open - National 17,435.90 0.00 Rescindido sidad y Servicios Ecosistém onitoring and Evaluation ( 3 27 11 29 18 29 04 08 30 icos del Minambiente, en el M&E) análisis de información téc nica, administrativa y finan ciera del Plan Integral de C ontención de la Deforestaci CO-PNF-405703-CS-INDV / ón. Prestar sus servicios profes ionales para apoyar a la Dir Component 4 - Project Coo ección de Bosques, Biodive rdination, Management, M 2024-02-2 2024-02- 2024-03- 2024-03- 2024-03- 2024-03- 2024-04- 2024-04- 2024-11- 2024-11- TF / A5789 Posterior Individual Open - National 14,358.97 0.00 Finalizado rsidad y Servicios Ecosisté onitoring and Evaluation ( 3 09 11 26 18 26 04 05 30 30 micos del Minambiente, en M&E) el manejo técnico y normat ivo de la fauna silvestre y l a resolución de conflictos s ocioambientales. CO-PNF-405714-CS-INDV / Prestar sus servicios profes ionales para apoyar la Dire Component 4 - Project Coo cción de Bosques, Biodiver rdination, Management, M 2024-02-2 2024-02- 2024-03- 2024-03- 2024-04- 2024-12- TF / A5789 Posterior Individual Open - National 14,358.97 0.00 Cancelado sidad y Servicios Ecosistém onitoring and Evaluation ( 3 12 13 20 06 02 icos del Minambiente, en g M&E) eoprocesar, recolectar, ana lizar y actualizar la informa ción geográfica relacionada con la implementación. CO-PNF-405718-CS-INDV / Prestar sus servicios perso nales como facilitador local para apoyar a la Asociación Component 2 - Forest Gov 2024-02-2 2024-02- 2024-02- 2024-02- 2024-03- 2024-02- 2024-03- 2024-02- 2024-11- de Juntas de Acción Comun TF / B1287 ernance, Management and Posterior Individual Limited 5,333.33 0.00 Firmado 3 06 28 05 06 06 23 14 18 al ASOCALAMAR, en el des Monitoring arrollo de las actividades d e extensión rural requerida s para el establecimiento, a compañamiento, seguimie nto y evaluación CO-PNF-405721-CS-INDV / Prestar sus servicios perso nales como facilitador local para apoyar a la Asociación Component 2 - Forest Gov 2024-02-2 2024-01- 2024-02- 2024-02- 2024-03- 2024-02- 2024-03- 2024-02- 2024-11- de Juntas de Acción Comun TF / B5182 ernance, Management and Posterior Individual Limited 5,333.33 0.00 Firmado 3 23 28 05 06 06 23 15 18 al ASOCAPRICHO, en el des Monitoring arrollo de las actividades d e extensión rural requerida s para el establecimiento, a compañamiento y seguimie nto. CO-PNF-405722-CS-INDV / Prestar sus servicios profes ionales para orientar la pla Component 1 - Protected nificación, concertación, im 2024-02-2 2024-02- 2024-03- 2024-03- 2024-03- 2024-03- 2024-04- 2024-04- 2024-11- TF / B5182 Areas Management and Fi Posterior Individual Open - National 11,008.00 0.00 Firmado plementación y seguimient 3 06 13 19 18 19 04 05 30 nancial Sustainability o de actividades de Restau ración en la Reserva Nacio nal Natural (RNN) NUKAK, e n el marco del proyecto GE F Corazón de la Amazonia CO-PNF-405724-CS-INDV / Prestar sus servicios profes ionales para apoyar a la Co rporación para el Desarroll Component 2 - Forest Gov 2024-02-2 2024-02- 2024-03- 2024-03- 2024-03- 2024-03- 2024-04- 2024-03- 2024-11- o Sostenible del Norte y el TF / B5182 ernance, Management and Posterior Individual Open - National 9,230.77 0.00 Firmado 3 06 11 20 18 20 04 27 30 Oriente Amazónico – CDA e Monitoring n la formulación, análisis, s eguimiento y actualización de las planificaciones predi ales sostenibles de los difer entes. CO-PNF-405731-CS-INDV / Prestar sus servicios profes ionales administrativos par a facilitar, apoyar, acompa Component 1 - Protected 2024-02-2 2024-02- 2024-03- 2024-02- 2024-03- 2024-02- 2024-03- 2024-02- 2024-11- 2024-11- ñar y gestionar con las áre TF / A5789 Areas Management and Fi Posterior Individual Direct - National 13,615.38 0.00 Finalizado 3 02 04 14 11 20 28 27 23 03 as protegidas de la Direcci nancial Sustainability ón Territorial Amazonía que cobija el Proyecto Conserva ción de Bosques y Sostenib ilidad en el Corazón de la A mazonía, CO-PNF-411300-CS-INDV / Prestar sus servicios profes ionales para apoyar la elab Component 4 - Project Coo oración de los informes nac rdination, Management, M 2024-03-2 2024-03- 2024-04- 2024-04- 2024-04- 2024-04- 2024-05- 2024-04- 2024-12- 2024-11- ionales de Colombia para l TF / A5789 Posterior Individual Open - National 12,564.10 0.00 Finalizado onitoring and Evaluation ( 9 06 21 16 28 16 15 22 11 24 a convención Ramsar y apo M&E) yar en la implementación d e actividades enmarcadas en los planes de manejo de los sitios Ramsar Estrella Fl uvial Inírida CO-PNF-411310-CS-INDV / Prestar sus servicios profes ionales para orientar la ges tión y manejo del Parque N Component 1 - Protected 2024-03-2 2024-03- 2024-04- 2024-03- 2024-04- 2024-03- 2024-05- 2024-03- 2024-12- atural Regional Miraflores y TF / B5182 Areas Management and Fi Posterior Individual Direct - National 8,533.33 0.00 Firmado 9 07 08 08 15 13 02 20 28 Picachos en el departamen nancial Sustainability to de Caquetá, a través del fortalecimiento de la gober nanza local del área proteg ida, en cumplimiento de las políticas CO-PNF-411318-CS-INDV / Prestar sus servicios profes ionales para apoyar a la Co Component 1 - Protected rporación para el Desarroll 2024-03-2 2024-03- 2024-04- 2024-04- 2024-05- 2024-04- 2024-05- 2024-05- 2025-01- TF / B5182 Areas Management and Fi Posterior Individual Open - National 8,923.08 0.00 Firmado o Sostenible del Norte y el 9 07 24 17 01 17 18 02 13 nancial Sustainability Oriente Amazónico – CDA e n el seguimiento, evaluació n y monitoreo del recurso h ídrico, forestal y el turismo de naturaleza. CO-PNF-411329-CS-INDV / Prestar sus servicios profes ionales para apoyar en la g eneración de sustentos y c Component 3 - Sectoral Pr 2024-03-2 2024-03- 2024-04- 2024-05- 2024-05- 2025-02- onceptos técnicos relacion TF / B5182 ograms for Sustainable La Posterior Individual Open - National 15,923.08 0.00 Cancelado 9 11 24 01 18 12 ados con la gestión ambien ndscape Management tal de proyectos de constru cción o intervención de infr aestructura de transporte, en la jurisdicción de Corpoa mazonia CO-PNF-411334-CS-INDV / Prestar sus servicios profes ionales para facilitar el pro Component 1 - Protected ceso de formulación de pro 2024-03-2 2024-03- 2024-04- 2024-04- 2024-05- 2024-04- 2024-05- 2024-05- 2025-03- TF / B5182 Areas Management and Fi Posterior Individual Open - National 15,384.62 0.00 Firmado yectos e iniciativas orienta 9 07 24 22 01 22 18 08 14 nancial Sustainability das a la implementación de l plan de manejo del sitio R amsar Lagos de Tarapoto e n el marco del proyecto GE F Corazón de la Amazonia. CO-PNF-411338-CS-INDV / Prestar sus servicios profes ionales para orientar los pr ocesos de participación soc Component 2 - Forest Gov 2024-03-2 2024-05- 2024-04- 2024-07- 2024-05- 2024-07- 2024-05- 2025-01- ial, concertación y fortaleci TF / B5182 ernance, Management and Posterior Individual Open - National 10,256.41 0.00 Cancelado 9 28 24 08 01 08 18 13 miento de capacidades con Monitoring las comunidades y organiz aciones locales para el esta blecimiento y mantenimien to de los acuerdos de cons ervación. CO-PNF-411341-CS-INDV / Prestar sus servicios perso nales para facilitar, acomp añar y apoyar las actividad Component 2 - Forest Gov Limited - Nationa 2024-03-2 2024-03- 2024-04- 2024-03- 2024-04- 2024-04- 2024-04- 2024-04- 2024-12- es de campo para la imple TF / B5182 ernance, Management and Posterior Individual 4,802.13 0.00 Firmado l 9 07 03 30 10 04 27 19 23 mentación de los acuerdos Monitoring de conservación, restauraci ón y no deforestación, en l as áreas priorizadas por CO RPOAMAZONIA en el marco del proyecto GEF. Page 17 CO-PNF-411354-CS-INDV / Prestar los servicios profesi onales para generar los co Component 3 - Sectoral Pr ntenidos técnicos de la Guí Limited - Nationa 2024-03-2 2024-03- 2024-04- 2024-03- 2024-04- 2024-04- 2024-04- 2024-05- 2024-09- TF / B5182 ograms for Sustainable La Posterior Individual 10,256.41 0.00 Firmado a de detalle para la aplicaci l 9 07 06 26 13 22 30 08 27 ndscape Management ón de los Lineamientos de I nfraestructura Verde Vial – LIVV - en las etapas de pref actibilidad, factibilidad, est udios y diseños definitivos. CO-PNF-411374-CS-INDV / Prestar sus servicios profes ionales para orientar los pr Component 1 - Protected ocesos de planificación, ord 2024-03-2 2024-03- 2024-04- 2024-04- 2024-04- 2024-04- 2024-04- 2024-05- 2024-12- TF / B5182 Areas Management and Fi Posterior Individual Open - National 9,846.15 0.00 Firmado enamiento ambiental y ges 9 07 15 19 22 19 30 06 26 nancial Sustainability tión del turismo de natural eza en áreas priorizadas po r la Corporación para el De sarrollo Sostenible del Nort e y el Oriente Amazónico – CO-PNF-411380-CS-INDV / CDA. Prestar sus servicios perso nales como facilitador local para acompañar y apoyar l Component 2 - Forest Gov Limited - Nationa 2024-03-2 2024-03- 2024-04- 2024-03- 2024-04- 2024-03- 2024-04- 2024-03- 2024-12- os procesos orientados a la TF / B5182 ernance, Management and Posterior Individual 4,102.56 0.00 Firmado l 9 07 06 10 13 15 30 27 26 implementación de la fores Monitoring tería comunitaria en el Núcl eo de Desarrollo Forestal y de la Biodiversidad NDFyB de Tarapacá, con la partici pación. CO-PNF-411393-CS-INDV / Prestar sus servicios perso nales para apoyar en aspec tos técnicos y logísticos el Component 1 - Protected 2024-03-2 2024-03- 2024-04- 2024-04- 2024-05- 2024-04- 2024-05- 2024-05- 2025-01- desarrollo de las actividade TF / B5182 Areas Management and Fi Posterior Individual Open - National 5,333.33 0.00 Firmado 9 11 24 23 01 23 18 10 13 s enmarcadas en los proce nancial Sustainability sos de planificación, gestió n, ordenamiento ambiental y gestión del turismo de na turaleza en áreas priorizad as por CDA CO-PNF-411626-CS-INDV / Prestar sus servicios profes ionales para desarrollar las acciones de comunicación, Component 1 - Protected 2024-03-2 2024-03- 2024-04- 2024-03- 2024-04- 2024-03- 2024-05- 2024-03- 2024-12- 2024-11- asesoría y orientación técni TF / A5789 Areas Management and Fi Posterior Individual Direct - National 23,866.80 0.00 Finalizado 9 06 11 08 18 08 05 13 31 14 ca a las actividades que de nancial Sustainability sarrollan los PNN de la Dire cción Territorial Amazonas -DTAM en las áreas de inter vención del proyecto GEF C orazón. CO-PNF-411633-CS-INDV / Prestar servicios profesiona les para liderar la gestión d Component 1 - Protected e procesos de participación 2024-03-2 2024-03- 2024-04- 2024-06- 2024-04- 2024-06- 2024-05- 2024-07- 2025-01- TF / B5182 Areas Management and Fi Posterior Individual Open - National 10,256.41 0.00 Firmado , concertación y fortalecimi 9 11 21 28 28 28 15 22 10 nancial Sustainability ento de capacidades con la s comunidades y organizaci ones locales para el Manejo de áreas protegidas y otros ecosistemas estratégicos. CO-PNF-412102-CS-INDV / Prestar sus servicios perso nales para apoyar la imple Component 1 - Protected mentación del programa d 2024-03-2 2024-03- 2024-04- 2024-03- 2024-04- 2024-03- 2024-05- 2024-03- 2024-12- 2024-11- TF / A5789 Areas Management and Fi Posterior Individual Direct - National 7,577.03 0.00 Finalizado e control y vigilancia y de 9 06 08 07 15 11 02 26 28 30 nancial Sustainability manejo de los recursos nat urales en el sitio Ramsar Es trella Fluvial del Inírida, me diante la facilitación, acom pañamiento técnico y logíst CO-PNF-412103-CS-INDV / ico. Prestar sus servicios como profesional de Sistemas de Información Geográfica – SI Component 2 - Forest Gov 2024-03-2 2024-03- 2024-04- 2024-03- 2024-04- 2024-03- 2024-05- 2024-03- 2024-12- G, para la generación, estr TF / B5182 ernance, Management and Posterior Individual Direct - National 9,230.77 0.00 Firmado 9 07 08 08 15 08 02 15 28 ucturación y procesamient Monitoring o de información geográfic a y forestales de las áreas donde se implementarán lo s núcleos de desarrollo fore stal sostenible CO-PNF-411397-CS-INDV / Prestar sus servicios profes ionales para orientar y reali zar los procedimientos y lin Component 2 - Forest Gov Limited - Nationa 2024-03-2 2024-04- 2024-04- 2024-05- 2024-04- 2024-05- 2024-04- 2024-05- 2024-12- eamientos jurídicos relacio TF / B5182 ernance, Management and Posterior Individual 10,256.41 0.00 Firmado l 9 23 06 07 13 15 30 23 26 nados con forestería comu Monitoring nitaria y los seguimientos a los acuerdos de conservaci ón, restauración y no defor estación en las áreas priori zadas. CO-PNF-411303-CS-INDV / Prestar sus servicios profes ionales para apoyar a la Co rporación para el Desarroll Component 2 - Forest Gov 2024-03-2 2024-03- 2024-04- 2024-03- 2024-04- 2024-03- 2024-05- 2024-04- 2025-01- o Sostenible del Norte y el TF / B5182 ernance, Management and Posterior Individual Direct - National 9,230.77 0.00 Firmado 9 18 08 19 15 26 02 04 27 Oriente Amazónico – CDA e Monitoring n la implementación, segui miento, evaluación y monit oreo de los acuerdos de co nservación, restauración y no deforestació CO-PNF-420156-CS-INDV / Prestar sus servicios profes Component 4 - Project Coo ionales para brindar apoyo rdination, Management, M 2024-04-3 2024-04- 2024-05- 2024-05- 2024-05- 2024-05- 2024-06- 2024-05- 2025-06- jurídico en las adquisicione TF / B5182 Posterior Individual Open - National 18,461.54 0.00 Firmado onitoring and Evaluation ( 0 05 18 03 25 03 11 14 06 s y contrataciones que se r M&E) equieran, de acuerdo con l o establecido en el marco d e la ejecución del Proyecto. CO-PNF-424070-CS-INDV / Apoyar la actividades oper ativas y técnicas con el fin Component 1 - Protected de agilizar los procesos de 2024-05-2 2024-05- 2024-06- 2024-06- 2024-07- 2024-11- TF / A5789 Areas Management and Fi Posterior Individual Open - National 2,051.28 0.00 Cancelado evaluación, monitoreo y ad 9 07 13 16 03 30 nancial Sustainability ministrativos que permita a vanzar con el cumplimiento del plan operativo anual (P OA) del Proyecto GEF Coraz ón de la Amazonía CO-PNF-424077-CS-INDV / Prestar sus servicios profes ionales para generar una e Component 4 - Project Coo strategia de recolección y c rdination, Management, M 2024-05-3 2024-12- 2024-06- 2024-06- 2024-07- 2024-11- TF / B5182 Posterior Individual Open - National 10,256.41 0.00 En ejecución ompilación de los resultado onitoring and Evaluation ( 0 12 22 29 16 13 s, impactos y lecciones apr M&E) endidas e implementarla e n los diferentes niveles de gestión del territorio donde se ha implementado el Pro CO-PNF-424130-CS-INDV / yecto. Prestar los servicios profesi onales para la creación y ej Component 2 - Forest Gov 2024-05-1 2024-05- 2024-06- 2024-05- 2024-06- 2024-05- 2024-07- 2024-06- 2024-11- 2024-11- ecución de una estrategia TF / A5789 ernance, Management and Posterior Individual Open - National 11,282.05 0.00 Finalizado 7 03 08 24 15 24 02 04 29 10 de comunicaciones que per Monitoring mita fortalecer el posiciona miento del Sistema de Mon itoreo de Bosques y Carbon o del IDEAM CO-PNF-424136-CS-INDV / Prestar sus servicios profes ionales especializados para Component 4 - Project Coo apoyar en la gestión de acc rdination, Management, M 2024-05-3 2024-04- 2024-06- 2024-05- 2024-06- 2024-05- 2024-07- 2024-05- 2024-11- 2024-10- TF / A5789 Posterior Individual Direct - National 16,666.67 0.00 Finalizado iones de conservación de l onitoring and Evaluation ( 0 29 07 06 14 14 01 23 28 28 os delfines de río, formulad M&E) as en los instrumentos de g estión y manejo nacionales y regionales de la amazoni a colombiana. CO-PNF-424140-CS-INDV / Prestar sus servicios profes ionales para acompañar té cnicamente los procesos y Component 2 - Forest Gov Limited - Nationa 2024-05-3 2024-05- 2024-06- 2024-05- 2024-06- 2024-06- 2024-06- 2024-06- 2025-02- prácticas para la restauraci TF / B5182 ernance, Management and Posterior Individual 8,205.13 0.00 Firmado l 0 03 04 15 11 04 28 28 23 ón ecológica de áreas degr Monitoring adadas en las áreas prioriz adas por CORPOAMAZONIA en el marco del proyecto “ Conservación de Bosques y Sostenibilidad CO-PNF-425106-CS-INDV / Prestar sus servicios profes ionales para orientar técnic Component 2 - Forest Gov amente los nuevos proceso 2024-06-2 2024-04- 2024-07- 2024-05- 2024-07- 2024-05- 2024-08- 2024-05- 2025-04- TF / B5182 ernance, Management and Posterior Individual Direct - National 8,533.33 0.00 Firmado s y prácticas para la restau 8 25 11 15 18 16 04 29 01 Monitoring ración ecológica de áreas d egradadas en las áreas prio rizadas por CORPOAMAZON IA y seguimiento a los ya e stablecidos. CO-PNF-425108-CS-INDV / Apoyar en la implementaci ón de la estrategia de com unicaciones a través de la Component 2 - Forest Gov 2024-06-2 2024-05- 2024-07- 2024-05- 2024-07- 2024-05- 2024-08- 2024-06- 2025-02- elaboración de piezas visua TF / B5182 ernance, Management and Posterior Individual Direct - National 5,600.00 0.00 Firmado 8 15 08 16 15 20 01 05 27 les, gráficas y escritas de al Monitoring ta calidad como instrument os de apoyo metodológico en los procesos de concert ación social e institucional del proyecto. CO-PNF-425120-CS-INDV / Prestar servicios profesiona les para la incorporación de Component 3 - Sectoral Pr la variable ambiental en los 2024-06-2 2024-05- 2024-07- 2024-05- 2024-07- 2024-05- 2024-08- 2024-05- 2025-02- TF / B5182 ograms for Sustainable La Posterior Individual Direct - National 20,533.33 0.00 Firmado instrumentos de planificaci 8 14 08 15 15 17 01 27 27 ndscape Management ón y de formulación de pro yectos del sector transport e en los modos carretero, a éreo, fluvial y férreo, así co mo el fortalecimiento. CO-PNF-425121-CS-INDV / Prestar sus servicios profes ionales para orientar a los s Component 4 - Project Coo ocios y liderar la implemen rdination, Management, M 2024-06-2 2024-05- 2024-07- 2024-05- 2024-07- 2024-05- 2024-08- 2024-05- 2025-07- TF / B5182 Posterior Individual Direct - National 33,043.20 0.00 Firmado tación de la estrategia de c onitoring and Evaluation ( 8 14 08 15 15 16 01 24 27 omunicaciones, divulgación M&E) y gestión del conocimiento a nivel nacional, regional y local del Proyecto GEF Cora zón de la Amazonia. CO-PNF-427019-CS-INDV / Apoyar la actividades oper ativas y logísticas con el fin de dar cumplimiento al des Component 1 - Protected 2024-06-2 2024-05- 2024-07- 2024-05- 2024-07- 2024-05- 2024-08- 2024-06- 2025-07- arrollo del plan de trabajo a TF / B5182 Areas Management and Fi Posterior Individual Direct - National 6,153.85 0.00 Firmado 8 15 08 16 15 22 01 06 27 cordado con ATICOYA y las nancial Sustainability entidades socias del Proyec to GEF Corazón de la Amaz onía, que permita avanzar con la implementación de l as líneas est CO-PNF-427020-CS-INDV / Prestar sus servicios técnic os para apoyar en campo e l establecimiento y el segui Component 2 - Forest Gov Limited - Nationa 2024-06-2 2024-08- 2024-07- 2024-08- 2024-07- 2024-08- 2024-07- 2024-09- 2025-02- miento a los sistemas de pr TF / B5182 ernance, Management and Posterior Individual 5,743.59 0.00 Firmado l 8 09 03 16 10 26 27 11 22 oducción sostenible, en el Monitoring marco de los acuerdos de c onservación, restauración y no deforestación, para la ef ectiva implementación del Proyecto. CO-PNF-425107-CS-INDV / Prestar sus servicios profes ionales en la orientación y acompañamiento técnico p Component 1 - Protected 2024-06-2 2024-06- 2024-07- 2024-06- 2024-07- 2024-06- 2024-08- 2024-07- 2025-01- ara la implementación de l TF / B5182 Areas Management and Fi Posterior Individual Direct - National 16,400.00 0.00 Firmado 8 07 08 13 15 18 01 02 28 as líneas de acción relacion nancial Sustainability adas con los componentes del Proyecto “Conservación de bosques y sostenibilidad en el Corazón de la Amazo nia” . CO-PNF-427811-CS-INDV / Prestar servicios profesiona les para recopilar, analizar Component 1 - Protected y generar información geog 2024-05-3 2024-05- 2024-06- 2024-05- 2024-06- 2024-05- 2024-07- 2024-05- 2024-11- 2024-11- TF / A5789 Areas Management and Fi Posterior Individual Direct - National 10,256.41 0.00 Finalizado ráfica y documental del Par 1 17 10 20 15 20 02 24 29 29 nancial Sustainability que Nacional Natural Serra nía de Chiribiquete que ser virá de insumo para la gest ión, manejo y monitoreo de l área protegida. CO-PNF-433361-CS-INDV / Prestar sus servicios como facilitador Local en el desar rollo de actividades de cam Component 3 - Sectoral Pr Limited - Nationa 2024-07-0 2024-06- 2024-07- 2024-06- 2024-07- 2024-06- 2024-08- 2024-07- 2024-11- 2024-11- po para el inventario forest TF / A5789 ograms for Sustainable La Posterior Individual 2,051.28 0.00 Finalizado l 1 18 06 19 16 25 02 19 30 26 al de los predios asociados ndscape Management al Núcleo de Desarrollo For estal - NDF La Rompida del Sitio Ramsar Estrella Fluvia l Inírida, departamento de Guainía CO-PNF-433410-CS-INDV / Prestar servicios profesiona les para asesorar a la Direc ción de Ordenamiento Amb Component 3 - Sectoral Pr 2024-07-3 2024-08- 2024-08- 2024-08- 2024-09- 2025-03- iental del Territorio (DOAT) TF / B5182 ograms for Sustainable La Posterior Individual Open - National 18,461.54 0.00 Cancelado 1 26 15 22 08 07 del Ministerio de Ambiente ndscape Management y Desarrollo Sostenible en l a formulación del Programa de ordenamiento territorial alrededor del agua – Amaz onía. CO-PNF-433418-CS-INDV / Prestar sus servicios profes ionales para brindar asiste Component 2 - Forest Gov Limited - Nationa 2024-07-3 2024-06- 2024-08- 2024-07- 2024-08- 2024-07- 2024-08- 2024-07- 2025-02- ncia técnica y apoyo al des TF / B5182 ernance, Management and Posterior Individual 6,923.08 0.00 Firmado l 1 18 05 03 10 12 27 30 23 arrollo empresarial de las o Monitoring rganizaciones de manejo fo restal, para optimizar y fort alecer el manejo forestal so stenible. CO-PNF-433422-CS-INDV / Prestar sus servicios como profesional de Sistemas de Component 4 - Project Coo Información Geográfica – SI rdination, Management, M 2024-07-3 2024-08- 2024-08- 2024-10- 2024-08- 2024-10- 2024-09- 2024-11- 2025-07- G, para la generación, estr TF / B5182 Posterior Individual Open - National 17,948.72 0.00 Firmado onitoring and Evaluation ( 1 09 17 25 24 25 10 12 07 ucturación y procesamient M&E) o de información geográfic a y forestales de las áreas donde se implementarán lo s núcleos de desarrollo fore stal sostenible CO-PNF-433443-CS-INDV / Apoyar la actividades oper ativas y técnicas con el fin Component 4 - Project Coo de agilizar los procesos de rdination, Management, M 2024-07-3 2024-06- 2024-08- 2024-08- 2024-09- 2025-09- TF / B5182 Posterior Individual Open - National 7,692.31 0.00 Cancelado evaluación, monitoreo y ad onitoring and Evaluation ( 1 21 15 22 08 03 ministrativos que permita a M&E) vanzar con el cumplimiento del plan operativo anual (P OA) del Proyecto GEF Coraz ón de la Amazonía. CO-PNF-433453-CS-INDV / Prestar sus servicios técnic os para apoyar en campo e l establecimiento y el segui Component 2 - Forest Gov Limited - Nationa 2024-07-3 2024-08- 2024-08- 2024-08- 2025-03- miento a los sistemas de pr TF / B5182 ernance, Management and Posterior Individual 5,461.71 0.00 Cancelado l 1 05 12 29 27 oducción sostenible, en el Monitoring marco de los acuerdos de c onservación, restauración y no deforestación, para la ef ectiva implementación del Proyecto. CO-PNF-434070-CS-INDV / Prestar sus servicios perso nales como facilitador local para acompañar y apoyar l Component 1 - Protected Limited - Nationa 2024-07-3 2024-06- 2024-08- 2024-06- 2024-08- 2024-06- 2024-08- 2025-03- os procesos orientados a la TF / B5182 Areas Management and Fi Posterior Individual 4,101.28 0.00 Cancelado l 1 18 05 21 10 28 27 25 implementación del Plan d nancial Sustainability e Manejo del Parque Natur al Regional Miraflores Picac hos con la participación y d iálogo entre las comunidad es de la zona CO-PNF-434072-CS-INDV / Prestar sus servicios perso nales como facilitador local Component 1 - Protected para acompañar y apoyar l Limited - Nationa 2024-07-3 2024-06- 2024-08- 2024-06- 2024-08- 2024-06- 2024-08- 2024-07- 2025-03- TF / B5182 Areas Management and Fi Posterior Individual 4,101.28 0.00 Firmado os procesos orientados a la l 1 18 05 23 10 28 27 17 25 nancial Sustainability implementación del Plan d e Manejo del Parque Natur al Regional Miraflores Picac hos con la participación y d iálogo de las comunidades. CO-PNF-434075-CS-INDV / Prestar sus servicios perso nales como facilitador local para acompañar y apoyar l Component 1 - Protected Limited - Nationa 2024-07-3 2024-06- 2024-08- 2024-06- 2024-08- 2024-06- 2024-08- 2024-07- 2025-03- os procesos orientados a la TF / B5182 Areas Management and Fi Posterior Individual 4,101.28 0.00 Firmado l 1 18 05 22 10 28 27 17 25 implementación del Plan d nancial Sustainability e Manejo del Parque Natur al Regional Miraflores Picac hos, con la participación y diálogo entre las comunida des de la zona CO-PNF-434079-CS-INDV / Prestar sus servicios perso nales apoyando las activida des operativas y logísticas Component 1 - Protected Limited - Nationa 2024-07-3 2024-06- 2024-08- 2024-06- 2024-08- 2024-06- 2024-08- 2024-07- 2025-01- que se requieran en el sect TF / B5182 Areas Management and Fi Posterior Individual 2,307.69 0.00 Firmado l 1 20 05 21 10 28 27 16 24 or de los ríos Guaviare – At nancial Sustainability abapo del Ramsar Estrella Fluvial de Inírida para la im plementación de las accion es priorizadas en el tema d e turismo. CO-PNF-434081-CS-INDV / Prestar sus servicios perso nales apoyando las activida des de sensibilización y aco Component 1 - Protected Limited - Nationa 2024-07-3 2024-06- 2024-08- 2024-06- 2024-08- 2024-06- 2024-08- 2024-07- 2025-01- mpañamiento para promov TF / B5182 Areas Management and Fi Posterior Individual 2,307.69 0.00 Firmado l 1 20 05 24 10 28 27 16 24 er la aplicación de lineamie nancial Sustainability ntos de turismo en el secto r del río Inírida – Caño Bocó n y el acompañamiento en instancias de articulación CO-PNF-434083-CS-INDV / Prestar sus servicios perso nales para acompañar y ap oyar los procesos orientado Component 2 - Forest Gov Limited - Nationa 2024-07-3 2024-06- 2024-08- 2024-06- 2024-08- 2024-06- 2024-08- 2024-07- 2025-01- s a la implementación de la TF / B5182 ernance, Management and Posterior Individual 2,564.10 0.00 Firmado l 1 18 05 22 10 28 27 17 24 forestería comunitaria con l Monitoring a participación y diálogo en tre las comunidades y Corp oamazonia en el marco del proyecto Corazón de la Am azonia. CO-PNF-434086-CS-INDV / Prestar sus servicios perso nales como facilitador local para acompañar y apoyar l Component 2 - Forest Gov Limited - Nationa 2024-07-3 2024-06- 2024-08- 2024-06- 2024-08- 2024-06- 2024-08- 2024-07- 2025-01- os procesos orientados a la TF / B5182 ernance, Management and Posterior Individual 2,564.10 0.00 Firmado l 1 18 05 22 10 28 27 23 24 implementación de la fores Monitoring tería comunitaria con la par ticipación y diálogo entre la s comunidades y CORPOAM AZONIA en el marco del pr oyecto CO-PNF-433404-CS-INDV / Prestar sus servicios para c ontribuir con sus conocimie Component 1 - Protected ntos profesionales y de rela 2024-07-3 2024-06- 2024-08- 2024-06- 2024-08- 2024-07- 2024-08- 2024-07- 2024-11- TF / B5182 Areas Management and Fi Posterior Individual Direct - National 3,846.15 0.00 Firmado cionamiento con comunida 0 27 09 28 16 15 24 26 22 nancial Sustainability des indígenas del Piedemo nte Andino Amazónico, en el marco de la coordinación de la función pública de la conservación. CO-PNF-435950-CS-INDV / Prestar servicios profesiona les para la gestión, suscrip Component 3 - Sectoral Pr ción y seguimiento técnico 2024-07-3 2024-06- 2024-08- 2024-06- 2024-08- 2024-07- 2024-09- 2024-07- 2025-08- TF / B5182 ograms for Sustainable La Posterior Individual Direct - National 28,800.00 0.00 Firmado de acuerdos con actores se 1 27 10 28 17 08 03 23 29 ndscape Management ctoriales y territoriales orie ntados a la aplicación e im plementación de instrumen tos técnicos y ambientales. Page 18 CO-PNF-440761-CS-INDV / Prestar sus servicios perso nales como facilitador local para acompañar y apoyar l Component 1 - Protected Limited - Nationa 2024-09-3 2024-08- 2024-10- 2024-08- 2024-10- 2024-08- 2024-11- 2024-08- 2025-05- os procesos orientados a la TF / B5182 Areas Management and Fi Posterior Individual 4,101.28 0.00 Firmado l 0 06 05 09 15 12 01 26 30 implementación del Plan d nancial Sustainability e Manejo del Parque Natur al Regional Miraflores Picac hos con la participación y d iálogo entre las comunidad es de la zona CO-PNF-440767-CS-INDV / contrata los servicios perso Component 4 - Project Coo nales del TRABAJADOR par rdination, Management, M 2024-09-3 2024-07- 2024-10- 2024-07- 2024-10- 2024-07- 2024-11- 2024-08- 2025-11- a mantener el archivo de m TF / B5182 Posterior Individual Direct - National 7,333.01 0.00 Firmado onitoring and Evaluation ( 0 26 10 29 20 29 06 01 01 anera digital y física de los M&E) procesos de adquisiciones adelantados en el marco d e la ejecución del Proyecto. CO-PNF-440768-CS-INDV / Prestar servicios técnicos y de apoyo a la gestión e imp Component 1 - Protected lementación de acciones d Limited - Nationa 2024-09-3 2024-08- 2024-10- 2024-08- 2024-10- 2024-08- 2024-10- 2024-09- 2025-03- TF / B5182 Areas Management and Fi Posterior Individual 3,017.05 0.00 Firmado e prevención, vigilancia y c l 0 05 05 08 12 27 29 05 28 nancial Sustainability ontrol del Parque Nacional Natural Alto Fragua Indi Wa si, en el marco del proyect o GEF Corazón de la Amazo nía CO-PNF-440770-CS-INDV / Prestar sus servicios profes ionales para desarrollar acc Component 1 - Protected iones relacionadas con el di 2024-09-3 2024-07- 2024-10- 2024-09- 2024-11- 2024-09- 2024-11- 2024-09- 2025-05- TF / B5182 Areas Management and Fi Posterior Individual Open - National 6,923.08 0.00 Firmado agnóstico y análisis del acc 0 29 27 02 03 02 20 10 19 nancial Sustainability eso a la tierra en áreas de especial importancia ambie ntal priorizadas por la Corp oración para el Desarrollo S ostenible del Norte y el Ori CO-PNF-440773-CS-INDV / ente Prestar sus servicios perso nales para facilitar, acomp añar y apoyar las actividad Component 2 - Forest Gov Limited - Nationa 2024-09-3 2024-07- 2024-10- 2024-08- 2024-10- 2024-08- 2024-10- 2024-08- 2025-04- es de campo para la imple TF / B5182 ernance, Management and Posterior Individual 3,076.92 0.00 Firmado l 0 29 05 03 12 05 29 26 27 mentación de los acuerdos Monitoring de conservación, restauraci ón y no deforestación, en l as áreas priorizadas por CO RPOAMAZONIA en el marco del proyecto. CO-PNF-443219-CS-INDV / Prestar servicios profesiona les para definir los contenid Component 3 - Sectoral Pr os de la Guía de detalle par Limited - Nationa 2024-09-3 2024-08- 2024-10- 2024-08- 2024-10- 2024-10- 2025-03- TF / B5182 ograms for Sustainable La Posterior Individual 10,256.41 0.00 Cancelado a la aplicación de los Linea l 0 20 05 30 12 29 28 ndscape Management mientos de Infraestructura Verde Vial - LIVV, en la eta pa de planificación estraté gica sectorial de infraestru ctura de carretera. CO-PNF-443227-CS-INDV / Prestar los servicios profesi onales para definir los cont enidos de la Guía de detall Component 3 - Sectoral Pr Limited - Nationa 2024-09-3 2024-08- 2024-10- 2024-08- 2024-10- 2024-09- 2024-10- 2024-09- 2025-03- e para la aplicación de los TF / B5182 ograms for Sustainable La Posterior Individual 10,256.41 0.00 Firmado l 0 12 05 13 12 06 29 18 28 Lineamientos de Infraestru ndscape Management ctura Verde Vial - LIVV, en l as etapas de construcción e intervención (mejoramien to, rehabilitación y manteni miento) CO-PNF-443284-CS-INDV / Prestar sus servicios profes ionales para orientar la con strucción y desarrolloe impl Component 2 - Forest Gov Limited - Nationa 2024-09-3 2024-08- 2024-10- 2024-08- 2024-10- 2024-08- 2024-10- 2024-09- 2025-10- ementación de una estrate TF / B5182 ernance, Management and Posterior Individual 12,307.69 0.00 Firmado l 0 12 05 15 12 26 29 11 24 gia de difusión y comunica Monitoring ción para fortalecer la gobe rnanza y la apropiación de l os diferentes actores locale s e institucionales que parti cipan CO-PNF-443228-CS-INDV / Prestar sus servicios profes ionales para orientar los pr ocesos de participación soc Component 2 - Forest Gov 2024-03-2 2024-05- 2024-05- 2024-07- 2024-05- 2024-07- 2024-05- 2024-07- 2025-01- ial, concertación y fortaleci TF / B5182 ernance, Management and Posterior Individual Open - National 10,256.41 0.00 Firmado 9 28 04 08 11 17 28 29 23 miento de capacidades con Monitoring las comunidades y organiz aciones locales para el esta blecimiento y mantenimien to de los acuerdos de cons ervación. CO-PNF-449631-CS-INDV / Prestar sus servicios profes ionales para contribuir a la Component 1 - Protected 2024-09-3 2024-09- 2024-10- 2024-12- 2024-11- 2024-12- 2024-11- 2025-01- 2025-06- implementación de los proc TF / B5182 Areas Management and Fi Posterior Individual Open - National 10,663.42 0.00 Firmado 0 22 28 23 04 23 24 16 07 esos de gobernanza prioriz nancial Sustainability ados por el Parque Naciona l Natural Alto Fragua Indi W asi con actores sociales e i nstitucionales. CO-PNF-449633-CS-INDV / Prestar servicios profesiona les para apoyar técnicame nte a la Corporación para e Component 2 - Forest Gov 2024-09-3 2024-09- 2024-11- 2024-10- 2024-11- 2024-10- 2024-11- 2024-10- 2025-11- l Desarrollo Sostenible del TF / B5182 ernance, Management and Posterior Individual Open - National 14,153.85 0.00 Firmado 0 10 04 01 11 01 28 11 23 Norte y en Oriente Amazón Monitoring ico - CDA en la implementa ción, ejecución y seguimien to del Plan de Gestión Ambi ental Regional (PGAR) 2024 - 2035. CO-PNF-449798-CS-INDV / Prestar servicios profesiona les para coordinar, impulsa Component 3 - Sectoral Pr 2024-09-3 2024-09- 2024-10- 2024-09- 2024-10- 2024-09- 2024-11- 2024-09- 2025-07- r y acompañar la gestión in TF / B5182 ograms for Sustainable La Posterior Individual Direct - National 20,512.82 0.00 Firmado 0 10 10 11 17 17 03 27 01 terinstitucional y la adopció ndscape Management n de acuerdos, criterios y h erramientas de planeación y gestión ambiental sosteni ble. CO-PNF-449799-CS-INDV / Prestar sus servicios profes ionales para apoyar en la g Component 3 - Sectoral Pr eneración de soportes y co 2024-09-3 2024-09- 2024-10- 2024-09- 2024-10- 2024-09- 2024-11- 2024-09- 2025-10- TF / B5182 ograms for Sustainable La Posterior Individual Direct - National 21,440.00 0.00 Firmado nceptos técnicos para la to 0 10 10 10 17 11 03 18 29 ndscape Management ma de decisiones en relaci ón con la gestión ambiental de proyectos de construcci ón o intervención de infrae structura de transporte. CO-PNF-455942-CS-INDV / Prestar sus servicios perso nales para apoyar, agilizar, Component 1 - Protected facilitar y centralizar los trá 2024-12-2 2024-10- 2025-01- 2024-10- 2025-01- 2024-10- 2025-01- 2024-11- 2026-05- TF / B5182 Areas Management and Fi Posterior Individual Direct - National 17,237.33 0.00 Firmado mites, gestiones y proceso 7 16 06 18 13 31 30 13 25 nancial Sustainability s administrativos que tiene a cargo el PNN Serranía de Chiribiquete en sus diferent es zonas de intervención. CO-PNF-455943-CS-INDV / Prestar sus servicios profes ionales para realizar el aco mpañamiento en la formul Component 2 - Forest Gov 2024-12-2 2024-10- 2025-01- 2024-10- 2025-01- 2024-10- 2025-01- 2024-11- 2026-08- ación de los insumos técnic TF / B5182 ernance, Management and Posterior Individual Direct - National 28,938.46 0.00 Firmado 7 16 06 18 13 18 30 06 23 os requeridos para adelant Monitoring ar las contrataciones y gest ionar el apoyo en el seguim iento operativo de los proc esos de manejo forestal y r estauración. CO-PNF-455946-CS-INDV / Prestar servicios personale s para facilitar, acompañar y apoyar las actividades de Component 2 - Forest Gov Limited - Nationa 2024-12-2 2024-10- 2025-01- 2024-10- 2025-01- 2024-10- 2025-01- 2024-11- 2026-01- campo para la implementa TF / B5182 ernance, Management and Posterior Individual 6,153.85 0.00 Firmado l 7 16 01 20 08 21 25 12 20 ción de los acuerdos de co Monitoring nservación, restauración y no deforestación, en las ár eas priorizadas por CORPO AMAZONÍA, en el marco del proyecto. CO-PNF-455947-CS-INDV / Prestar servicios personale s como facilitador indígena Component 1 - Protected local para apoyar las activi Limited - Nationa 2024-11-2 2024-10- 2024-12- 2024-10- 2024-12- 2024-10- 2024-12- 2024-11- 2025-12- TF / B5182 Areas Management and Fi Posterior Individual 4,612.61 0.00 Firmado dades de Prevención, Vigila l 7 16 02 18 09 21 26 12 21 nancial Sustainability ncia y Control definidas por el Santuario de Flora Planta s Medicinales Orito Ingi An de, en su protocolo de PVC . CO-PNF-455944-CS-INDV / Prestar servicios personale s para facilitar, acompañar y apoyar las actividades de Component 2 - Forest Gov Limited - Nationa 2024-12-2 2024-11- 2025-01- 2024-11- 2025-01- 2024-12- 2025-01- 2025-01- 2026-01- campo para la implementa TF / B5182 ernance, Management and Posterior Individual 6,153.85 0.00 Firmado l 7 19 01 20 08 16 25 28 20 ción de los acuerdos de co Monitoring nservación, restauración y no deforestación, en las ár eas priorizadas por CORPO AMAZONÍA, en el marco del proyecto. CO-PNF-458275-CS-INDV / Prestar sus servicios profes ionales para apoyar a la Co rporación para el Desarroll Component 3 - Sectoral Pr 2024-12-2 2024-11- 2025-01- 2024-11- 2025-01- 2024-11- 2025-01- 2024-11- 2026-01- o Sostenible del Norte y Ori TF / B5182 ograms for Sustainable La Posterior Individual Direct - National 21,538.46 0.00 Firmado 7 05 06 13 13 14 30 25 25 ente Amazónico – CDA, en l ndscape Management a generación de insumos, s oportes y conceptos técnic os para la toma de decision es en relación con la gestió n ambiental CO-PNF-458276-CS-INDV / Prestar sus servicios profes ionales para apoyar jurídica Component 2 - Forest Gov mente los procesos para la 2024-11-2 2024-11- 2024-12- 2024-12- 2025-01- 2026-06- TF / B5182 ernance, Management and Posterior Individual Direct - National 22,430.77 0.00 Cancelado aplicación de prácticas de 8 05 08 15 01 25 Monitoring manejo forestal sostenible en bosque natural, en las á reas priorizadas por CORPO AMAZONIA en el marco del proyecto. CO-PNF-458269-CS-INDV / Prestar sus servicios profes ionales para orientar la imp lementación del Plan de Ma Component 1 - Protected 2024-11-2 2024-11- 2024-12- 2024-11- 2024-12- 2024-11- 2024-12- 2024-11- 2026-06- nejo del PNN La Paya, a tra TF / B5182 Areas Management and Fi Posterior Individual Direct - National 36,480.00 0.00 Firmado 8 05 04 06 09 15 26 25 19 vés del desarrollo de la estr nancial Sustainability ategia de UOT (Uso, Ocupa ción y Tenencia) y REP (Re stauración Ecológica Partici pativa) al interior del Área Protegida CO-PNF-458278-CS-INDV / Prestar sus servicios profes ionales con el fin de realiza r labores de apoyo requerid Component 2 - Forest Gov 2024-11-2 2024-11- 2024-12- 2024-11- 2024-12- 2024-11- 2025-01- 2024-11- 2026-06- as para el establecimiento TF / B5182 ernance, Management and Posterior Individual Direct - National 23,330.70 0.00 Firmado 8 05 08 06 15 08 01 18 25 y el seguimiento técnico en Monitoring campo a sistemas de produ cción sostenible de usuario s del Proyecto Conservació n de Bosques y Sostenibilid ad CO-PNF-461620-CS-INDV / Prestar sus servicios profes ionales administrativos par a facilitar, apoyar, acompa Component 1 - Protected 2024-12-2 2024-11- 2025-01- 2024-11- 2025-01- 2024-11- 2025-01- 2024-11- 2026-01- ñar y gestionar con las áre TF / B5182 Areas Management and Fi Posterior Individual Direct - National 19,734.11 0.00 Firmado 7 14 06 18 13 18 30 25 25 as protegidas de la Direcci nancial Sustainability ón Territorial Amazonía que cobija el Proyecto Conserva ción de Bosques y Sostenib ilidad en el Corazón de la A mazonía. CO-PNF-461622-CS-INDV / Prestar sus servicios profes ionales para desarrollar las acciones de comunicación, Component 1 - Protected 2024-12-2 2024-11- 2025-01- 2024-11- 2025-01- 2024-11- 2025-01- 2024-11- 2025-07- asesoría y orientación técni TF / B5182 Areas Management and Fi Posterior Individual Direct - National 16,123.35 0.00 Firmado 7 14 06 18 13 18 30 25 29 ca a las actividades que de nancial Sustainability sarrollan los PNN de la Dire cción Territorial Amazonas - DTAM en las áreas de inte rvención del proyecto GEF Corazón CO-PNF-461630-CS-INDV / Prestar sus servicios profes ionales para orientar la ges tión y manejo del Parque N Component 1 - Protected 2024-12-2 2024-11- 2025-01- 2024-11- 2025-01- 2024-11- 2025-01- 2024-12- 2026-07- atural Regional Miraflores y TF / B5182 Areas Management and Fi Posterior Individual Direct - National 20,736.00 0.00 Firmado 7 15 06 27 13 28 30 06 24 Picachos en el departamen nancial Sustainability to de Caquetá, a través del fortalecimiento de la gober nanza local del área proteg ida, en cumplimiento de las políticas CO-PNF-461635-CS-INDV / Prestar sus servicios profes ionales como enlace institu cional en la gestión, planea Component 2 - Forest Gov 2024-12-2 2024-11- 2025-01- 2024-11- 2025-01- 2024-11- 2025-01- 2024-11- 2026-01- ción y seguimiento operati TF / B5182 ernance, Management and Posterior Individual Direct - National 33,846.15 0.00 Firmado 7 14 06 15 13 18 30 25 25 vo para la implementación Monitoring del Componente 2. Manejo y uso sostenible de los bos ques y el agua, en congrue ncia con los marcos metod ológicos CO-PNF-461637-CS-INDV / Prestar sus servicios profes Component 4 - Project Coo ionales para dar soporte, a rdination, Management, M 2024-12-2 2024-11- 2025-01- 2024-11- 2025-01- 2024-11- 2025-01- 2024-11- 2026-01- poyar y acompañar la reali TF / B5182 Posterior Individual Direct - National 23,655.38 0.00 Firmado onitoring and Evaluation ( 7 14 06 15 13 18 30 25 25 zación de procesos de adq M&E) uisiciones y contrataciones que se requieran en el mar co de la ejecución del Proy ecto. CO-PNF-461642-CS-INDV / Prestar sus servicios profes ionales para acompañar, br Component 2 - Forest Gov indar asistencia técnica y a 2024-12-2 2024-11- 2025-01- 2024-11- 2025-01- 2024-12- 2025-01- 2024-12- 2026-06- TF / B5182 ernance, Management and Posterior Individual Direct - National 22,569.92 0.00 Firmado poyar los procesos orientad 7 26 06 29 13 02 30 11 24 Monitoring os a la implementación de l a forestería comunitaria en los Núcleos de Desarrollo F orestal y de la Biodiversida d - NDFyB en el Bajo Caguá CO-PNF-461645-CS-INDV / n. Prestar sus servicios profes ionales con el fin de genera r y procesar información es Component 2 - Forest Gov 2024-12-2 2024-11- 2025-01- 2024-11- 2025-01- 2024-11- 2025-01- 2024-12- 2026-07- pacial de áreas priorizadas TF / B5182 ernance, Management and Posterior Individual Direct - National 26,241.51 0.00 Firmado 7 19 06 21 13 22 30 03 24 por CORPOAMAZONIA para Monitoring la restauración ecológica e n áreas degradadas; donde se implementen acuerdos de conservación, restauraci ón CO-PNF-461646-CS-INDV / Prestar sus servicios profes ionales para orientar técnic amente los procesos de art Component 2 - Forest Gov 2024-12-2 2024-11- 2025-01- 2024-12- 2025-01- 2024-12- 2025-01- 2024-12- 2026-07- iculación institucional y con TF / B5182 ernance, Management and Posterior Individual Direct - National 49,248.00 0.00 Firmado 7 26 06 02 13 04 30 18 24 certación social requeridos Monitoring para la aplicación de prácti cas de manejo sostenible d el paisaje, bajo enfoque de manejo forestal y de restau ración CO-PNF-461648-CS-INDV / Prestar sus servicios profes ionales adelantando las lab Component 2 - Forest Gov ores de campo requeridas 2024-12-2 2024-11- 2025-01- 2024-11- 2025-01- 2024-11- 2025-01- 2024-12- 2026-07- TF / B5182 ernance, Management and Posterior Individual Direct - National 26,916.92 0.00 Firmado para la concertación, el est 7 15 06 19 13 20 30 03 24 Monitoring ablecimiento y mantenimie nto de los sistemas de man ejo sostenibles en los núcle os de desarrollo forestal pri orizados por CORPOAMAZO CO-PNF-461656-CS-INDV / NIA Prestar sus servicios como profesional de Sistemas de Información Geográfica - SI Component 2 - Forest Gov 2024-12-2 2024-11- 2025-01- 2024-11- 2025-01- 2024-11- 2025-01- 2024-11- 2026-07- G, para la generación, estr TF / B5182 ernance, Management and Posterior Individual Direct - National 22,430.77 0.00 Firmado 7 15 06 19 13 21 30 29 24 ucturación y procesamient Monitoring o de información geográfic a y forestales de las áreas donde se implementarán lo s núcleos de desarrollo fore stal sostenible CO-PNF-461666-CS-INDV / Prestar servicios profesiona les con el fin de apoyar los Component 2 - Forest Gov 2024-12-2 2024-11- 2025-01- 2024-11- 2025-01- 2024-12- 2025-01- 2024-12- 2026-01- procesos administrativos, o TF / B5182 ernance, Management and Posterior Individual Direct - National 16,615.38 0.00 Rescindido 7 26 06 28 13 02 30 10 25 perativos requeridos para e Monitoring l seguimiento a la ejecució n de las actividades a carg o de Corpoamazonia en el proyecto. CO-PNF-461667-CS-INDV / Prestar servicios profesiona les de apoyo administrativo Component 2 - Forest Gov requeridos en el seguimien 2024-12-2 2024-11- 2025-01- 2024-11- 2025-01- 2024-12- 2025-01- 2024-12- 2026-01- TF / B5182 ernance, Management and Posterior Individual Direct - National 12,627.69 0.00 Firmado to a la planeación, program 7 26 06 29 13 02 30 13 25 Monitoring ación y ejecución de las act ividades, establecidas en el Plan de Adquisiciones y el P lan Operativo Anual a carg o de CORPOAMAZONIA. CO-PNF-461669-CS-INDV / Prestar servicios de apoyo a la gestión, realizando acti vidades de operario de la e Component 2 - Forest Gov 2024-12-2 2024-11- 2025-01- 2024-11- 2025-01- 2024-11- 2025-01- 2024-11- 2026-01- mbarcación dispuesta para TF / B5182 ernance, Management and Posterior Individual Direct - National 8,473.85 0.00 Firmado 7 15 06 19 13 21 30 29 25 el desplazamiento del equi Monitoring po técnico de CORPOAMAZ ONIA en las áreas priorizad as por la Iniciativa GEF “Co nservación de Bosques y S ostenibilidad en CO-PNF-461701-CS-INDV / Prestar sus servicios profes ionales con el fin de apoyar Component 4 - Project Coo al proyecto GEF corazón de rdination, Management, M 2024-12-2 2024-11- 2025-01- 2024-11- 2025-01- 2024-11- 2025-01- 2024-11- 2026-01- TF / B5182 Posterior Individual Direct - National 14,080.00 0.00 Firmado la Amazonia en la realizaci onitoring and Evaluation ( 7 14 06 15 13 15 30 25 25 ón, procesamiento y análisi M&E) s de estudios de mercado, generando recomendacion es con base en los resultad os de los estudios CO-PNF-463496-CS-INDV / Prestar sus servicios profes ionales para el acompañam Component 3 - Sectoral Pr 2024-12-2 2024-12- 2025-01- 2024-12- 2025-01- 2024-12- 2025-02- 2024-12- 2026-01- iento técnico y asesoría en TF / B5182 ograms for Sustainable La Posterior Individual Direct - National 21,440.00 0.00 Firmado 7 04 11 05 18 09 04 13 30 la incorporación de criterio ndscape Management s ambientales durante la pl anificación de los proyecto s de infraestructura en los municipios. CO-PNF-463498-CS-INDV / Prestar sus servicios profes ionales para apoyar en la g eneración de sustentos y c Component 3 - Sectoral Pr 2024-12-2 2024-12- 2025-01- 2024-12- 2025-01- 2024-12- 2025-02- 2025-01- 2026-01- onceptos técnicos relacion TF / B5182 ograms for Sustainable La Posterior Individual Direct - National 22,080.00 0.00 Firmado 7 04 11 05 18 13 04 10 30 ados con la gestión ambien ndscape Management tal de proyectos de constru cción o intervención de infr aestructura de transporte, en la jurisdicción de Corpoa mazonia CO-PNF-463502-CS-INDV / Prestar servicios profesiona les para apoyar Corpoamaz onia, territorial Caquetá, en Component 3 - Sectoral Pr 2024-12-2 2024-12- 2025-01- 2024-12- 2025-01- 2024-12- 2025-02- 2024-12- 2025-10- el acompañamiento y asist TF / B5182 ograms for Sustainable La Posterior Individual Direct - National 13,333.33 0.00 Firmado 7 04 11 05 18 10 04 18 02 encia técnica a los municipi ndscape Management os obligados al cumplimien to de la orden 3 de la Sent encia 4360 de 2018 y a la i mplementación del Conpes 4021 de 2020 “ Page 19 CO-PNF-463506-CS-INDV / Prestar servicios profesiona les para apoyar a CORPOA MAZONIA Territorial Putum Component 3 - Sectoral Pr 2024-12-2 2024-12- 2025-01- 2024-12- 2025-01- 2024-12- 2025-02- 2024-12- 2025-10- ayo, en el acompañamient TF / B5182 ograms for Sustainable La Posterior Individual Direct - National 13,333.33 0.00 Firmado 7 04 11 05 18 09 04 18 02 o y asistencia técnica a los ndscape Management municipios al cumplimiento de la Orden 3 de la Senten cia 4360 de 2018 y a la apli cación del CONPES 4021 d e 2020. CO-PNF-463508-CS-INDV / Prestar sus servicios perso nales para apoyar al Área P rotegida y las organizacion Component 1 - Protected 2024-12-2 2024-12- 2025-01- 2024-12- 2025-01- 2024-12- 2025-02- 2025-01- 2026-06- es indígenas y campesinas TF / B5182 Areas Management and Fi Posterior Individual Direct - National 14,461.76 0.00 Firmado 7 04 11 09 18 16 04 09 29 del PNN La Paya, en los dif nancial Sustainability erentes trámites técnicos, operativos, de gestión y pr ocesos administrativos en el marco de la ejecución de l proyecto. CO-PNF-463512-CS-INDV / Prestar sus servicios perso nales como facilitador local para apoyar a ASOJUNTAS Component 2 - Forest Gov Limited - Nationa 2024-12-2 2024-12- 2025-01- 2025-01- 2025-01- 2025-01- 2025-01- 2025-02- 2026-01- Charras Boquerón- Sector TF / B5182 ernance, Management and Posterior Individual 8,307.69 0.00 Firmado l 7 04 01 07 08 20 25 06 20 Boquerón, en el desarrollo Monitoring de las actividades de exten sión rural requeridas para e l establecimiento y acompa ñamiento de los acuerdos d e conservación. CO-PNF-463513-CS-INDV / Prestar sus servicios perso nales como facilitador local para apoyar a ASOJUNTAS Component 2 - Forest Gov Limited - Nationa 2024-12-2 2024-12- 2025-01- 2025-01- 2025-01- 2025-01- 2025-01- 2025-01- 2026-01- Charras Boquerón- Sector TF / B5182 ernance, Management and Posterior Individual 8,307.69 0.00 Firmado l 7 04 01 07 08 21 25 30 20 Charras, en el desarrollo de Monitoring las actividades de extensió n rural requeridas para el e stablecimiento y acompaña miento de los acuerdos de conservación. CO-PNF-463662-CS-INDV / EL EMPLEADOR contrata lo s servicios personales del T Component 4 - Project Coo RABAJADOR para desempe rdination, Management, M 2025-01-3 2024-12- 2025-02- 2025-02- 2025-03- 2025-02- 2025-03- 2025-02- 2026-03- TF / B5182 Posterior Individual Open - National 6,153.85 0.00 Firmado ñar el cargo de Asistente A onitoring and Evaluation ( 1 04 25 07 04 07 21 19 16 dministrativo y Financiero M&E) y éste se obliga con el prim ero a asistir las actividades de carácter administrativo, operativo y financiero. CO-PNF-463828-CS-INDV / Prestar sus servicios profes Component 4 - Project Coo ionales para el desarrollo g rdination, Management, M 2024-12-2 2024-12- 2025-01- 2024-12- 2025-01- 2024-12- 2025-02- 2024-12- 2026-01- ráfico y editorial de la ident TF / B5182 Posterior Individual Direct - National 32,949.23 0.00 Firmado onitoring and Evaluation ( 7 04 11 05 18 09 04 13 30 idad visual y posicionamien M&E) to de la Iniciativa GEF “Con servación de Bosques y Sos tenibilidad en el Corazón d e la Amazonia”. CO-PNF-463898-CS-INDV / Prestar sus servicios profes ionales para brindar asiste Component 1 - Protected ncia técnica y facilitar la co 2024-12-2 2024-12- 2025-01- 2025-01- 2025-01- 2025-01- 2025-02- 2025-01- 2026-02- TF / B5182 Areas Management and Fi Posterior Individual Open - National 19,200.00 0.00 Firmado ordinación con entidades y 7 04 24 13 31 13 17 22 12 nancial Sustainability comunidades, en apoyo a l a gestión del Ministerio de Ambiente y Desarrollo Sost enible en el sitio Ramsar Es trella Fluvial del Inírida). CO-PNF-463899-CS-INDV / Prestar servicios profesiona les para definir los contenid Component 3 - Sectoral Pr os de la Guía de detalle par 2024-12-2 2024-12- 2025-01- 2025-01- 2025-01- 2025-01- 2025-02- 2025-01- 2025-07- TF / B5182 ograms for Sustainable La Posterior Individual Open - National 10,256.41 0.00 Firmado a la aplicación de los Linea 7 04 21 10 28 10 14 24 14 ndscape Management mientos de Infraestructura Verde Vial – LIVV, en la eta pa de planificación estraté gica sectorial de infraestru ctura carretera. CO-PNF-464777-CS-INDV / Prestar servicios de apoyo administrativos y operativo Component 2 - Forest Gov s requeridos en el seguimie 2024-12-2 2024-12- 2025-01- 2024-12- 2025-01- 2024-12- 2025-01- 2024-12- 2026-01- TF / B5182 ernance, Management and Posterior Individual Direct - National 13,978.46 0.00 Firmado nto a la planeación, progra 7 04 06 09 13 10 30 18 25 Monitoring mación y ejecución de las a ctividades, establecidas en el Plan de Adquisiciones y el Plan Operativo Anual. CO-PNF-466294-CS-INDV / Prestar sus servicios profes ionales para apoyar a la co Component 4 - Project Coo ordinación del SMBYC y a l rdination, Management, M 2025-01-3 2024-12- 2025-02- 2024-12- 2025-02- 2024-12- 2025-03- 2025-01- 2026-03- TF / B5182 Posterior Individual Direct - National 28,923.07 0.00 Firmado a Subdirección de Ecosiste onitoring and Evaluation ( 1 17 10 24 17 24 06 09 01 mas e Información Ambient M&E) al del IDEAM en las activida des de seguimiento y moni toreo administrativo, financ iero y de planeación. CO-PNF-466299-CS-INDV / Prestar sus servicios profes ionales para orientar la imp Component 4 - Project Coo lementación de la Estrategi rdination, Management, M 2025-01-3 2024-12- 2025-02- 2024-12- 2025-02- 2024-12- 2025-03- 2025-01- 2026-03- TF / B5182 Posterior Individual Direct - National 28,248.00 0.00 Firmado a de Prevención y Gestión onitoring and Evaluation ( 1 17 10 18 17 19 06 09 01 de riesgo de vulneraciones M&E) a los Derechos Humanos e infracciones al Derecho Int ernacional Humanitario del Proyecto. CO-PNF-466304-CS-INDV / Prestar los servicios técnic os para apoyar la realizació Component 1 - Protected n de las acciones de diagnó Limited - Nationa 2025-01-3 2024-12- 2025-02- 2024-12- 2025-02- 2024-12- 2025-03- 2025-01- 2026-02- TF / B5182 Areas Management and Fi Posterior Individual 10,089.60 0.00 Firmado stico biofísico y relacionami l 1 17 05 19 12 24 01 09 24 nancial Sustainability ento con las comunidades ocupantes del área protegi da para facilitar la concerta ción, suscripción e implem entación de los acuerdos CO-PNF-466309-CS-INDV / Prestar sus servicios perso nales como Facilitador Loca l para apoyar en el proceso Component 1 - Protected Limited - Nationa 2025-01-3 2024-12- 2025-02- 2025-01- 2025-02- 2025-01- 2025-03- 2025-01- 2026-02- de relacionamiento entre la TF / B5182 Areas Management and Fi Posterior Individual 6,030.77 0.00 Firmado l 1 17 05 07 12 10 01 20 24 comunidad campesina El Tr nancial Sustainability iunfo y el PNN La Paya, que contribuya a la implementa ción de acuerdos de Restau ración Ecológica Participati va. CO-PNF-466462-CS-INDV / Prestar sus servicios profes ionales para orientar y hac Component 4 - Project Coo er seguimiento a la aplicaci rdination, Management, M 2025-01-3 2024-12- 2025-02- 2024-12- 2025-02- 2024-12- 2025-03- 2025-01- 2025-11- TF / B5182 Posterior Individual Direct - National 20,758.97 0.00 Firmado ón de los instrumentos de s onitoring and Evaluation ( 1 17 10 18 17 18 06 09 01 alvaguardas sociales y amb M&E) ientales del proyecto GEF C orazón de la Amazonia con su respectivo proceso docu mental. CO-PNF-466464-CS-INDV / Prestar servicios profesiona les para liderar la declarato ria, gestión y manejo de las Component 1 - Protected 2025-01-3 2024-12- 2025-02- 2024-12- 2025-02- 2024-12- 2025-03- 2024-12- 2026-03- áreas protegidas y otros ec TF / B5182 Areas Management and Fi Posterior Individual Direct - National 20,567.04 0.00 Firmado 1 17 10 18 17 18 06 20 01 osistemas estratégicos del nancial Sustainability Sistema Nacional de Áreas Protegidas -SINAP, prioriza dos por la Corporación para el Desarrollo Sostenible del Norte CO-PNF-467769-CS-INDV / El EMPLEADOR contrata los Component 4 - Project Coo servicios del TRABAJADOR rdination, Management, M 2025-01-3 2024-12- 2025-02- 2024-12- 2025-02- 2024-12- 2025-03- 2025-01- 2026-03- para desempeñar el cargo TF / B5182 Posterior Individual Direct - National 11,805.02 0.00 Firmado onitoring and Evaluation ( 1 20 10 27 17 30 06 07 01 de Profesional de Adquisici M&E) ones en el proyecto GEF Co nservación de Bosques y S ostenibilidad en el Corazón de la Amazonía, CO-PNF-467775-CS-INDV / El EMPLEADOR contrata los Component 4 - Project Coo servicios del TRABAJADOR rdination, Management, M 2025-01-3 2024-12- 2025-02- 2024-12- 2025-02- 2024-12- 2025-03- 2025-01- 2026-03- para desempeñar el cargo TF / B5182 Posterior Individual Direct - National 14,335.72 0.00 Firmado onitoring and Evaluation ( 1 20 10 27 17 30 06 07 01 de Profesional de Adquisici M&E) ones en el proyecto GEF Co nservación de Bosques y S ostenibilidad en el Corazón de la Amazonía, CO-PNF-467784-CS-INDV / Prestar sus servicios perso nales como facilitador local para acompañar y apoyar l Component 2 - Forest Gov Limited - Nationa 2025-01-3 2024-12- 2025-02- 2024-12- 2025-02- 2025-01- 2025-03- 2025-01- 2026-02- os procesos orientados a la TF / B5182 ernance, Management and Posterior Individual 6,400.00 0.00 Firmado l 1 23 05 28 12 10 01 22 24 implementación de la fores Monitoring tería comunitaria con la par ticipación y diálogo entre la s comunidades y CORPOAM AZONIA en el marco del pr oyecto. CO-PNF-466467-CS-INDV / Prestar sus servicios técnic os para la apoyar a PNN en Component 1 - Protected las fases de aprestamiento 2025-01-3 2024-12- 2025-02- 2024-12- 2025-02- 2024-12- 2025-03- 2025-01- 2026-03- TF / B5182 Areas Management and Fi Posterior Individual Direct - National 10,089.60 0.00 Firmado y desarrollo de las activida 1 23 10 24 17 30 06 13 01 nancial Sustainability des de restauración partici pativa a partir de los acuer dos que se suscriban con la s familias ocupantes del PN N La Paya. CO-PNF-472453-CS-CDS / Auditoría de los recursos a Component 4 - Project Coo dministrados por Patrimoni Selección direct rdination, Management, M 2025-03-3 2025-01- 2025-04- 2025-05- 2026-05- o Natural y el Instituto SINC TF / B5182 Posterior a de consultore Direct - National 12,820.51 0.00 En ejecución onitoring and Evaluation ( 1 28 10 31 26 HI bajo el (TFA5789) de la s M&E) primera financiación adicio nal y (TF0B5182) de la seg unda financiación adicional del Proyecto. CO-PNF-472485-CS-INDV / Prestar servicios profesiona les para la incorporación de Component 3 - Sectoral Pr 2025-03-3 2025-01- 2025-04- 2025-01- 2025-04- 2025-01- 2025-05- 2025-02- 2026-05- la variable ambiental en los TF / B5182 ograms for Sustainable La Posterior Individual Direct - National 36,607.69 0.00 Firmado 1 28 20 29 30 31 17 10 12 instrumentos de planificaci ndscape Management ón y de formulación de pro yectos del sector transport e en los modos carretero, a éreo, fluvial y férreo. CO-PNF-472493-CS-INDV / Prestar sus servicios profes ionales para apoyar a la Co Component 2 - Forest Gov 2025-03-3 2025-01- 2025-04- 2025-01- 2025-04- 2025-01- 2025-05- 2025-02- 2026-04- rporación para el Desarroll TF / B5182 ernance, Management and Posterior Individual Direct - National 12,800.00 0.00 Firmado 1 28 10 29 17 30 04 06 29 o Sostenible del Norte y el Monitoring Oriente Amazónico – CDA e n la implementación, segui miento, evaluación y monit oreo de los acuerdos. CO-PNF-472500-CS-INDV / Prestar sus servicios profes ionales para apoyar a la Co Component 2 - Forest Gov rporación para el Desarroll 2025-03-3 2025-01- 2025-04- 2025-01- 2025-04- 2025-01- 2025-05- 2025-02- 2026-04- TF / B5182 ernance, Management and Posterior Individual Direct - National 14,400.00 0.00 Firmado o Sostenible del Norte y el 1 28 10 28 17 30 04 06 29 Monitoring Oriente Amazónico CDA en la formulación, análisis, se guimiento y actualización d e las planificaciones predial es sostenibles. CO-PNF-472505-CS-INDV / Prestar sus servicios profes ionales para apoyar técnica mente los procesos orienta Component 2 - Forest Gov 2025-03-3 2025-01- 2025-04- 2025-01- 2025-04- 2025-02- 2025-05- 2025-02- 2026-05- dos a la implementación de TF / B5182 ernance, Management and Posterior Individual Direct - National 12,307.69 0.00 Firmado 1 28 10 30 25 07 12 14 07 la forestería comunitaria y l Monitoring a restauración ecológica, e n los Núcleos de Desarrollo Forestal y de la Biodiversid ad y en otras áreas prioriza das. CO-PNF-472512-CS-INDV / Prestar sus servicios perso nales como facilitador indíg ena, para apoyar la implem Component 1 - Protected Limited - Nationa 2025-03-3 2025-01- 2025-04- 2025-01- 2025-04- 2025-02- 2025-04- 2025-02- 2025-09- entación de los Acuerdos P TF / B5182 Areas Management and Fi Posterior Individual 2,692.31 0.00 Firmado l 1 28 05 30 12 07 29 18 26 olíticos de Voluntades, en l nancial Sustainability a fase de construcción de u n mecanismo conjunto par a la articulación y coordina ción entre el Parques Nacio nales Naturale CO-PNF-472528-CS-INDV / Prestar sus servicios perso nales como facilitador indíg ena, para apoyar la implem Component 1 - Protected Limited - Nationa 2025-03-3 2025-01- 2025-04- 2025-01- 2025-04- 2025-02- 2025-04- 2025-02- 2025-09- entación de los Acuerdos P TF / B5182 Areas Management and Fi Posterior Individual 2,692.37 0.00 Firmado l 1 28 05 30 12 13 29 19 26 olíticos de Voluntades, en l nancial Sustainability a fase de construcción de u n mecanismo conjunto par a la articulación y coordina ción entre el Parques Nacio nales Naturale CO-PNF-472529-CS-INDV / Prestar sus servicios perso nales como facilitador local , apoyando las actividades Component 1 - Protected Limited - Nationa 2025-03-3 2025-01- 2025-04- 2025-02- 2025-04- 2025-02- 2025-04- 2025-02- 2026-04- operativas y logísticas que TF / B5182 Areas Management and Fi Posterior Individual 4,615.38 0.00 Firmado l 1 28 05 03 12 07 29 18 24 se requieran en el marco d nancial Sustainability el Plan de Trabajo acordad o con la Mesa Ramsar EFI y las entidades socias del Pro yecto GEF Corazón de la A mazonia CO-PNF-472530-CS-INDV / Prestar sus servicios perso nales como facilitador técni co de enlace Indígena para Component 1 - Protected Limited - Nationa 2025-03-3 2025-01- 2025-04- 2025-01- 2025-04- 2025-02- 2025-04- 2025-02- 2025-09- apoyar la implementación TF / B5182 Areas Management and Fi Posterior Individual 3,823.08 0.00 Firmado l 1 28 05 30 12 07 29 14 26 del Acuerdo Político de Vol nancial Sustainability untades en la fase de const rucción de un mecanismo c onjunto para la articulación y coordinación entre Parqu es Nacionales CO-PNF-472538-CS-INDV / Prestar servicios profesiona les para asesorar a la Direc ción de Ordenamiento Amb Component 3 - Sectoral Pr 2025-03-3 2025-01- 2025-05- 2025-05- 2025-06- 2026-02- iental del Territorio (DOAT) TF / B5182 ograms for Sustainable La Posterior Individual Open - National 20,512.82 0.00 En ejecución 1 28 14 21 07 02 del Ministerio de Ambiente ndscape Management y Desarrollo Sostenible en l a incorporación del enfoqu e de ordenamiento territori al alrededor del agua para el programa CO-PNF-472539-CS-INDV / Prestar los servicios profesi onales para la ejecución de Component 4 - Project Coo la estrategia de comunicaci rdination, Management, M 2025-03-3 2025-01- 2025-05- 2025-02- 2025-05- 2025-02- 2025-06- 2025-02- 2026-05- ones que permita fortalece TF / B5182 Posterior Individual Open - National 23,974.36 0.00 Firmado onitoring and Evaluation ( 1 28 14 20 21 20 07 27 03 r el posicionamiento del Sis M&E) tema de Monitoreo de Bosq ues y Carbono del IDEAM e n el marco de la implement ación del proyecto CONSER VACIÓN DE BOSQUE CO-PNF-472540-CS-INDV / Prestar sus servicios perso nales como Facilitador Téc Component 1 - Protected nico Indígena Cultural del p Limited - Nationa 2025-03-3 2025-01- 2025-04- 2025-01- 2025-04- 2025-02- 2025-04- 2025-02- 2026-02- TF / B5182 Areas Management and Fi Posterior Individual 6,410.26 0.00 Firmado ueblo Murui Muiná, para ap l 1 28 05 30 12 10 29 19 23 nancial Sustainability oyar la implementación de los Acuerdos Políticos de V oluntades, en la fase de co nstrucción de un mecanism o conjunto CO-PNF-472541-CS-INDV / Prestar servicios profesiona les para el desarrollo de m edidas de manejo que pro Component 1 - Protected 2025-03-3 2025-01- 2025-05- 2025-03- 2025-05- 2025-03- 2025-06- 2026-06- muevan la interacción adec TF / B5182 Areas Management and Fi Posterior Individual Open - National 19,076.92 0.00 En ejecución 1 28 19 04 26 04 12 07 uada entre las comunidade nancial Sustainability s campesinas, la población de jaguar (Panthera onca) y los ecosistemas estratégi cos en veredas de San Vice nte del Caguán. CO-PNF-472542-CS-INDV / Prestar servicios profesiona les para desarrollar la ruta Component 1 - Protected de acuerdos para la Restau 2025-03-3 2025-01- 2025-05- 2025-02- 2025-05- 2025-02- 2025-06- 2025-03- 2026-05- TF / B5182 Areas Management and Fi Posterior Individual Open - National 22,475.15 0.00 Firmado ración Ecológica Participati 1 28 09 21 16 21 02 06 28 nancial Sustainability va (REP) en el PNN Sierra d e La Macarena, en áreas pr iorizadas (veredas) con alta deforestación, siguiendo lo s criterios institucionales d eCO-PNF-472748-CS-INDV PNN / Prestar servicios personale s como facilitador comunita Component 1 - Protected rio para acompañar y apoy Limited - Nationa 2025-03-3 2025-01- 2025-04- 2025-04- 2025-04- 2026-04- TF / B5182 Areas Management and Fi Posterior Individual 7,076.92 0.00 En ejecución ar el establecimiento y ma l 1 28 05 12 29 24 nancial Sustainability ntenimiento de un vivero, p ara la producción y siembr a de plántulas y el establec imiento e implementación de parcelas agroecológica. CO-PNF-472787-CS-INDV / Prestar sus servicios profes ionales para apoyar a la Dir ección de Bosques, Biodive Component 2 - Forest Gov 2025-03-3 2025-01- 2025-04- 2025-01- 2025-04- 2025-01- 2025-05- 2025-02- 2026-04- rsidad y Servicios Ecosisté TF / B5182 ernance, Management and Posterior Individual Direct - National 27,200.00 0.00 Firmado 1 28 10 29 17 29 04 05 29 micos del Minambiente, en Monitoring el análisis de información t écnica, administrativa y fin anciera del Plan Integral de Contención de la Deforesta ción. CO-PNF-472790-CS-INDV / Prestar sus servicios profes ionales para apoyar a la Dir Component 2 - Forest Gov ección de Bosques, Biodive 2025-03-3 2025-01- 2025-04- 2025-01- 2025-04- 2025-01- 2025-05- 2025-02- 2026-04- TF / B5182 ernance, Management and Posterior Individual Direct - National 22,400.00 0.00 Firmado rsidad y Servicios Ecosisté 1 28 10 29 17 29 04 05 29 Monitoring micos del Minambiente, en el manejo técnico y normat ivo de la fauna silvestre y l a resolución de conflictos s ocioambientales. CO-PNF-472851-CS-INDV / Prestar servicios profesiona les administrativos para ga rantizar la ejecución efectiv Component 1 - Protected 2025-03-3 2025-01- 2025-05- 2025-02- 2025-05- 2025-02- 2025-05- 2025-03- 2026-05- a y oportuna de las activid TF / B5182 Areas Management and Fi Posterior Individual Open - National 12,549.60 0.00 Firmado 1 28 09 21 16 21 24 05 19 ades del proyecto 'Conserv nancial Sustainability ación de Bosques y Sosteni bilidad en el Corazón de la Amazonía', en el marco de las áreas protegidas de la DTOR. CO-PNF-472853-CS-INDV / Prestar servicios profesiona les para establecer y fortal Component 1 - Protected ecer los mecanismos de art 2025-03-3 2025-01- 2025-05- 2025-05- 2025-06- 2026-05- TF / B5182 Areas Management and Fi Posterior Individual Open - National 21,582.90 0.00 En ejecución iculación e interlocución en 1 28 09 16 02 28 nancial Sustainability tre las Áreas Protegidas PN N Sierra de La Macarena, P NN Cordillera de los Picach os y PNN Tinigua, la Direcci ón Territorial Orinoquia CO-PNF-472855-CS-INDV / Apoyar la caracterización, c oncertación e implementac Component 1 - Protected ión de acuerdos de restaur 2025-03-3 2025-01- 2025-05- 2025-02- 2025-05- 2025-02- 2025-06- 2025-03- 2026-05- TF / B5182 Areas Management and Fi Posterior Individual Open - National 9,846.20 0.00 Firmado ación ecológica participativ 1 30 09 27 16 27 02 07 28 nancial Sustainability a a nivel de veredas prioriz adas en el PNN Sierra de la Macarena como mecanism o para frenar el avance de l a frontera agropecuaria Page 20 CO-PNF-472531-CS-INDV / Prestar sus servicios perso nales como Facilitador Téc nico de Enlace Indígena en Component 1 - Protected Limited - Nationa 2025-03-3 2025-02- 2025-04- 2025-02- 2025-04- 2025-02- 2025-04- 2025-02- 2025-08- la planeación, análisis, seg TF / B5182 Areas Management and Fi Posterior Individual 2,695.68 0.00 Firmado l 1 03 05 04 12 07 29 14 27 uimiento e implementación nancial Sustainability del plan de acción del Acue rdo Político de Voluntades, apoyando la articulación y coordinación, entre el Parq ue Nacional CO-PNF-472746-CS-INDV / Prestar servicios de facilita dor técnico para apoyar la Component 1 - Protected concertación y suscripción Limited - Nationa 2025-03-3 2025-02- 2025-04- 2025-04- 2025-04- 2026-04- TF / B5182 Areas Management and Fi Posterior Individual 10,153.85 0.00 En ejecución de acuerdos de restauració l 1 04 05 12 29 24 nancial Sustainability n y la implementación de p arcelas agroecológicas, co mo contribución a recupera ción de la biodiversidad. CO-PNF-472749-CS-INDV / Prestar servicios personale s como facilitador comunita rio para apoyar la movilida Component 1 - Protected Limited - Nationa 2025-03-3 2025-02- 2025-04- 2025-04- 2025-04- 2026-04- d en torno al acercamiento TF / B5182 Areas Management and Fi Posterior Individual 7,076.92 0.00 En ejecución l 1 05 05 12 29 24 a las familias, en el marco nancial Sustainability del establecimiento de acu erdos de restauración en la producción y siembra de pl ántulas y parcelas agroecol ógicas. CO-PNF-476928-CS-INDV / Prestar sus servicios profes ionales para orientar técnic Component 2 - Forest Gov amente los nuevos proceso 2025-03-3 2025-02- 2025-04- 2025-02- 2025-04- 2025-02- 2025-05- 2025-02- 2026-07- TF / B5182 ernance, Management and Posterior Individual Direct - National 18,632.31 0.00 Firmado s y prácticas para la restau 1 14 10 18 17 20 04 28 28 Monitoring ración ecológica de áreas d egradadas en las áreas prio rizadas por CORPOAMAZON IA y seguimiento a los ya e stablecidos. CO-PNF-476931-CS-INDV / Prestar sus servicios técnic os para apoyar las activida Component 1 - Protected des de planificación, conce 2025-03-3 2025-02- 2025-04- 2025-02- 2025-04- 2025-02- 2025-05- 2025-03- 2026-04- TF / B5182 Areas Management and Fi Posterior Individual Direct - National 10,769.23 0.00 Firmado rtación, implementación y 1 14 10 19 17 24 04 03 29 nancial Sustainability seguimiento a las acciones de restauración ecológica e n el Resguardo El Itilla, loca lizado al interior del PNN Se rranía de Chiribiquete. CO-PNF-476933-CS-INDV / Prestar servicios profesiona les para apoyar técnicame nte a la Corporación para e Component 2 - Forest Gov 2025-03-3 2025-02- 2025-04- 2025-05- 2025-05- 2026-05- l Desarrollo Sostenible del TF / B5182 ernance, Management and Posterior Individual Open - National 14,769.23 0.00 En ejecución 1 14 25 02 19 14 Norte y el Oriente Amazóni Monitoring co - CDA en la implementa ción, ejecución y seguimien to del Plan de Gestión Ambi ental Regional (PGAR) 2024 - 2035 CO-PNF-476935-CS-INDV / Prestar servicios profesiona les para garantizar la conce Component 1 - Protected rtación, suscripción e imple 2025-03-3 2025-02- 2025-04- 2025-05- 2025-05- 2026-05- TF / B5182 Areas Management and Fi Posterior Individual Open - National 20,769.23 0.00 En ejecución mentación de los acuerdos 1 18 25 02 19 14 nancial Sustainability de restauración vinculados al establecimiento de parce las agroecológicas en el PN N Tinigua, siguiendo los crit erios institucionales de PN NCO-PNF-476937-CS-INDV / Prestar sus servicios perso nales como Facilitador Indí gena Tradicional del Pueblo Component 1 - Protected Limited - Nationa 2025-03-3 2025-02- 2025-04- 2025-02- 2025-04- 2025-02- 2025-04- 2026-02- Murui Muina, para apoyar e TF / B5182 Areas Management and Fi Posterior Individual 6,410.26 0.00 En ejecución l 1 14 05 18 12 24 29 23 n la interlocución, articulaci nancial Sustainability ón y coordinación de accio nes entre Asociación de Au toridades Tradicionales y C abildos de los Pueblos Indíg enas CO-PNF-476940-CS-INDV / Prestar los servicios como Facilitador Indígena con el f Component 1 - Protected in de apoyar los procesos o Limited - Nationa 2025-03-3 2025-02- 2025-04- 2025-02- 2025-04- 2025-02- 2025-04- 2025-03- 2025-09- TF / B5182 Areas Management and Fi Posterior Individual 2,692.32 0.00 Firmado perativos para el análisis y l 1 14 05 19 12 24 29 07 26 nancial Sustainability seguimiento de la impleme ntación del Acuerdos Polític os de Voluntades, que apor te a la documentación del ejercicio de la coordinación .CO-PNF-476955-CS-INDV / Prestar sus servicios perso nales como Facilitador Loca l Indígena para apoyar las Component 1 - Protected Limited - Nationa 2025-03-3 2025-03- 2025-04- 2025-03- 2025-04- 2025-03- 2025-04- 2026-04- acciones requeridas en la c TF / B5182 Areas Management and Fi Posterior Individual 5,649.96 0.00 En ejecución l 1 03 05 04 12 10 29 24 oncertación, implementaci nancial Sustainability ón y seguimiento de las act ividades de Restauración E cológica en el Resguardo in dígena El Itilla, traslapado c on el PNN CO-PNF-476961-CS-INDV / Prestar servicios profesiona les de asistencia técnica a l os procesos orientados a la Component 2 - Forest Gov Limited - Nationa 2025-03-3 2025-02- 2025-04- 2025-02- 2025-04- 2025-03- 2025-05- 2026-04- implementación de la fores TF / B5182 ernance, Management and Posterior Individual 16,307.69 0.00 En ejecución l 1 14 10 19 17 07 04 29 tería comunitaria diversific Monitoring ada, para el aprovechamie nto y manejo sostenible de los bosques naturales en lo s Núcleos de Desarrollo For estal CO-PNF-476965-CS-INDV / Prestar servicios personale s para apoyar a la Corporac Component 2 - Forest Gov ión para el Desarrollo Soste 2025-03-3 2025-02- 2025-04- 2025-05- 2025-05- 2026-05- TF / B5182 ernance, Management and Posterior Individual Open - National 9,230.77 0.00 En ejecución nible del Norte y el Oriente 1 14 28 05 22 17 Monitoring Amazónico - CDA, en el des arrollo de aspectos técnico s para el manejo forestal so stenible, planificación predi al y restauración ambiental CO-PNF-481182-CS-INDV / Prestar servicios profesiona les para orientar la gestión y el manejo de las áreas pr Component 1 - Protected Ejecución pendi 2025-03-3 2025-04- 2025-04- 2025-05- 2026-04- otegidas y otras áreas de i TF / B5182 Areas Management and Fi Posterior Individual Direct - National 21,538.46 0.00 ente 1 10 17 04 29 mportancia para la conserv nancial Sustainability ación, en el marco de los pl anes de manejo, en jurisdic ción de CORPOAMAZONIA y áreas de intervención del p royecto. CO-PNF-481189-CS-INDV / Prestar sus servicios profes ionales para la planificació Component 1 - Protected n, concertación, implement Ejecución pendi 2025-03-3 2025-05- 2025-05- 2025-05- 2026-05- TF / B5182 Areas Management and Fi Posterior Individual Open - National 15,384.62 0.00 ación y seguimiento a las a ente 1 04 11 28 23 nancial Sustainability cciones de restauración ec ológica en el PNN Serranía de Chiribiquete, en el secto r de Calamar- Guaviare, en el marco del proyecto. CO-PNF-481191-CS-INDV / Prestar sus servicios perso nales para facilitar, acomp añar y apoyar las actividad Component 2 - Forest Gov Limited - Nationa Ejecución pendi 2025-03-3 2025-04- 2025-04- 2025-04- 2026-04- es de campo para la imple TF / B5182 ernance, Management and Posterior Individual 6,400.00 0.00 l ente 1 05 12 29 24 mentación de los acuerdos Monitoring de conservación, restauraci ón y no deforestación, en l as áreas priorizadas por CO RPOAMAZONIA en el marco del proyecto. CO-PNF-481201-CS-INDV / Prestar sus servicios perso nales para facilitar y realiza Component 1 - Protected r el acompañamiento técni Ejecución pendi 2025-03-3 2025-04- 2025-04- 2025-05- 2026-04- TF / B5182 Areas Management and Fi Posterior Individual Direct - National 12,501.54 0.00 co y logístico en el desarrol ente 1 10 17 04 29 nancial Sustainability lo de actividades priorizada s del Plan de Manejo Ambie ntal del Ramsar EFI en el m arco del proyecto GEF Cora zón de la Amazonia. CO-PNF-481218-CS-INDV / Prestar sus servicios profes ionales para acompañar té Component 2 - Forest Gov cnicamente los procesos y Ejecución pendi 2025-03-3 2025-04- 2025-04- 2025-05- 2026-04- TF / B5182 ernance, Management and Posterior Individual Direct - National 13,292.31 0.00 prácticas para la restauraci ente 1 10 17 04 29 Monitoring ón ecológica de áreas degr adadas en las áreas prioriz adas por CORPOAMAZONIA en el marco del proyecto. CO-PNF-481293-CS-INDV / Apoyar en la implementaci ón de la estrategia de com unicaciones a través de la Component 2 - Forest Gov Ejecución pendi 2025-03-3 2025-04- 2025-04- 2025-05- 2026-05- elaboración de piezas visua TF / B5182 ernance, Management and Posterior Individual Direct - National 9,984.00 0.00 ente 1 10 20 07 02 les, gráficas y escritas de al Monitoring ta calidad como instrument os de apoyo metodológico en los procesos de concert ación social e institucional del proyecto. CO-PNF-482047-CS-INDV / Prestar sus servicios profes ionales para apoyar a la Co Component 2 - Forest Gov rporación para el Desarroll Ejecución pendi 2025-03-3 2025-04- 2025-04- 2025-05- 2026-04- TF / B5182 ernance, Management and Posterior Individual Direct - National 16,000.00 0.00 o Sostenible del Norte y Ori ente 1 10 17 04 29 Monitoring ente Amazónico - CDA en l a generación, interpretació n, procesamiento y análisis de datos e información geo espacial. CO-PNF-482073-CS-INDV / Prestar servicios profesiona les como enlace técnico, p ara orientar y acompañar l Component 1 - Protected Ejecución pendi 2025-03-3 2025-04- 2025-04- 2025-05- 2026-04- a implementación de las lín TF / B5182 Areas Management and Fi Posterior Individual Direct - National 40,000.00 0.00 ente 0 09 16 03 28 eas de acción relacionadas nancial Sustainability con los componentes del pr oyecto “Conservación de b osques y sostenibilidad en el Corazón de la Amazonía” . Page 21