Procurement Plan Sustainable Rural Water Supply and Sanitation Project PROCUREMENT Kyrgyz Republic : Sustainable Rural Water Supply and Sanitation Project PLAN General Information Country: Kyrgyz Republic Bank’s Approval Date of the Original Procurement Plan: 2017-02-08 Revised Plan Date(s): (comma delineated, leave blank if2025-01-30 none) Project ID: P154778 GPN Date: Project Name: Sustainable Rural Water Supply and Sanitation Project Loan / Credit No: TF / A1605, IDA / D1380, IDA / 59070, IDA / D2040, IDA / 60880, IDA / 74700 Community Development and Investment Agency Executing Agency(ies): WORKS Activity Reference No. Procurem Actual A Bid Evaluation Repo Loan / Credit Market Approa Procurement Pr Prequalificatio High SEA/SH Process Draft Pre-qualificatio Prequalification Eval Draft Bidding Docu Specific Procuremen Bidding Documents Proposal Submission Contract Compl / Description Component Review Type Method ent Docu mount ( rt and Recommenda Signed Contract No. ch ocess n (Y/N) Risk Status n Documents uation Report ment / Justification t Notice / Invitation as Issued / Opening / Minutes etion ment Typ US$) tion for Award e Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planne Actu d al IDA-SRWSSDP-CW-17-1 / Single Stage - On 414,322.0 Complete 2016-12-3 2017-01-0 2017-02-1 2017-04-1 2017-04-2 2017-05-1 2017-06-1 2017-11- 2019- Rehabilitation of water sup IDA / 59070 Water Supply Investments Prior Request for Bids Open - National e Envelope 1 d 0 4 5 1 7 6 3 12 09-07 ply system in Togotoi IDA-SRWSSDP-CW-2017-2 Single Stage - On 3,484,396 Complete 2017-05-1 2017-05-0 2017-05-2 2017-07-0 2017-06-0 2017-08-0 2017-07-2 2017-09-0 2017-09-0 2018-03- 2019- / Rehabilitation of water su IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope .44 d 6 5 1 2 5 1 0 5 3 04 06-05 pply system in Kyrgyz-Ata (5 lots) IDA-SRWSSDP-CW-2017-3 Single Stage - On 2,300,631 Complete 2017-05-1 2017-04-2 2017-05-2 2017-07-0 2017-05-2 2017-08-0 2017-07-2 2017-09-0 2017-09-0 2018-03- 2020- / Rehabilitation of water su IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope .35 d 6 8 1 2 9 1 0 5 3 04 07-05 pply system in Sultan (3lo ts) IDA-SRWSSDP-CW-2017-4 Single Stage - On 2,476,062 Complete 2017-05-1 2017-05-0 2017-05-2 2017-07-0 2017-06-0 2017-08-0 2017-07-2 2017-09-0 2017-09-0 2018-03- 2019- / Rehabilitation of water su IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope .26 d 6 5 1 2 5 1 1 5 3 04 06-05 pply system in Panfilovka (3 lots) IDA-SRWSSDP-CW-2017-6 Single Stage - On 1,582,371 Complete 2017-12-0 2018-02-0 2017-12-0 2018-01-1 2018-03-1 2018-02-1 2018-04-2 2018-03-2 2018-06-1 2018-09- 2020- / Rehabilitation of water su IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope .95 d 1 9 6 7 3 6 0 3 2 19 07-15 pply system in Alekseevk a IDA-SRWSSDP-CW-2018-7 Single Stage - On 943,824.6 Complete 2018-01-2 2018-05-0 2018-02-0 2018-03-1 2018-06-1 2018-04-1 2018-07-1 2018-05-2 2018-09-1 2018-11- 2019- / Rehabilitation of water su IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 7 d 9 4 3 7 9 6 1 1 1 17 11-14 pply system in Kyzyl-Tuu IDA-SRWSSDP-CW-2018-8 Single Stage - On 1,311,126 Complete 2018-01-2 2018-05-0 2018-02-0 2018-03-1 2018-06-0 2018-04-1 2018-07-1 2018-05-2 2018-09-1 2018-11- 2021- / Rehabilitation of water su IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope .88 d 9 4 3 7 7 6 1 1 1 17 06-18 pply system in Kun-Tuu IDA-SRWSSDP-CW-2018-9 Single Stage - On 480,923.0 Terminate 2018-07-0 2018-09-0 2018-07-0 2018-08-1 2018-10-1 2018-09-1 2019-01-2 2018-10-2 2019-03-0 2019-04- / Rehabilitation of water su IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 8 d 1 7 6 7 8 6 5 1 1 19 pply system in Darkan IDA-SRWSSDP-CW-2018-1 Single Stage - On 509,569.5 Complete 2018-07-0 2018-09-0 2018-07-0 2018-08-1 2018-10-1 2018-09-1 2019-01-2 2018-10-2 2019-03-1 2019-04- 2019- 0 / Rehabilitation of water IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 0 d 1 3 6 7 8 6 5 1 8 19 12-30 supply system in Chelpek IDA-SRWSSDP-CW-2018-1 Single Stage - On 403,830.4 Complete 2018-08-2 2019-07-2 2018-09-0 2018-10-1 2019-09-0 2018-11-1 2019-10-1 2018-12-1 2019-12-1 2019-06- 2021- 1 / Rehabilitation of water IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 2 d 9 6 3 5 4 4 5 9 1 17 09-15 supply system in Sary-Tas h IDA-SRWSSDP-CW-2018-1 Single Stage - On 527,664.6 Complete 2018-08-2 2019-07-2 2018-09-0 2018-10-1 2019-09-0 2018-11-1 2019-10-1 2018-12-1 2019-12-0 2019-06- 2021- 2 / Rehabilitation of water IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 0 d 9 6 3 5 4 4 5 9 9 17 10-15 supply system in Achyk-S uu IDA-SRWSSDP-CW-2018-1 Single Stage - On 2018-08-2 2018-09-0 2018-10-1 2018-11-1 2018-12-1 2019-06- 4 / Rehabilitation of water IDA / D2040 Water Supply Investments Post Request for Bids Open - National 0.00 Canceled e Envelope 9 3 5 4 9 17 supply system in Otuz Ady r IDA-SRWSSDP-CW-2018-1 Single Stage - On 368,970.7 Complete 2018-03-0 2018-02-0 2018-03-0 2018-04-1 2018-03-1 2018-05-1 2018-04-2 2018-06-2 2018-06-0 2018-12- 2019- 6 / Rehabilitation of water IDA / D2040 Water Supply Investments Post Request for Bids Open - National e Envelope 3 d 2 7 7 8 3 8 0 2 7 19 08-10 supply system in Tolok SRWSSDP-SHOPPING-WO Institutional Strengthenin Request for Quo Single Stage - On Complete 2018-04-3 2018-06-2 2018-05-0 2018-12- 2018- IDA / D1380 Post Open - National 2,807.86 RKS-2018-1 / Renovation g tations e Envelope d 0 5 7 22 07-02 work for DWWSD IDA-SRWSSDP-SW-2018-1 / Rehabiltation of public co Request for Quo Single Stage - On 104,536.8 Complete 2018-06-1 2018-06-2 2018-08-1 2018-09-2 2019-02- 2019- IDA / 59070 Sanitation Development Post Limited nveniences in schools (inte tations e Envelope 0 d 5 9 0 6 06 07-11 rnal toilets) in Osh oblast IDA-SRWSSDP-SW-2018-2 / Rehabiltation of public co Request for Quo Single Stage - On Complete 2018-06-1 2018-11-2 2018-08-1 2019-03-0 2019-02- 2019- IDA / D1380 Sanitation Development Post Limited 66,563.69 nveniences in schools of C tations e Envelope d 5 0 0 3 06 09-29 huy oblast (inner toilets) IDA-SRWSSDP-AF-CW-201 Single Stage - On 481,348.4 Complete 2018-09-0 2019-08-2 2018-09-1 2018-10-2 2019-09-2 2018-11-2 2019-10-2 2018-12-3 2019-12-1 2019-12- 2021- 8-15 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 1 d 6 3 4 6 5 5 9 0 8 30 05-25 er supply system in Tamga IDA-SRWSSDP-AF-CW-19- Single Stage - On 990,872.0 Complete 2019-02-1 2019-02-1 2019-02-2 2019-04-0 2019-03-1 2019-05-0 2019-05-1 2019-06-0 2019-07-1 2019-12- 2021- 18 / Rehabilitation of wate IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 0 d 5 5 0 3 9 3 4 7 8 04 09-15 r supply system in Korul (2 Lots) IDA-SRWSSDP-AF-CW-18- Single Stage - On 481,621.3 Complete 2019-06-0 2019-07-2 2019-06-1 2019-07-1 2019-09-0 2019-08-1 2019-10-1 2019-09-2 2019-12-1 2020-09- 2021- 18 / Rehabilitation of wate IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 7 d 3 6 7 7 4 6 5 0 9 19 09-17 r supply system in Ak-Bula k IDA-SRWSSDP-AF-CW-201 Single Stage - On 2018-09-1 2019-02-1 2018-09-2 2018-11-0 2019-03-1 2018-12-0 2019-01-0 2020-01- 8-17 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National 0.00 Canceled e Envelope 1 5 1 2 9 2 6 06 er supply system in Ichke- Bulun IDA-SRWSSDP-AF-CW-202 Single Stage - On 232,976.3 Complete 2020-01-2 2020-01-3 2020-02-0 2020-03-1 2020-03-0 2020-04-1 2020-05-0 2020-05-2 2020-05-2 2021-05- 2022- 0-19 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 8 d 7 0 3 6 3 5 7 0 9 20 07-04 er supply system in Belek IDA-SRWSSDP-AF-CW-202 Single Stage - On 298,422.6 Complete 2020-01-2 2020-01-3 2020-02-0 2020-03-1 2020-03-0 2020-04-1 2020-05-0 2020-05-2 2020-06-1 2021-05- 2021- 0-20 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 6 d 7 0 3 6 3 5 7 0 1 20 11-08 er supply system in Shalta IDA-SRWSSDP-SW-2018-4 Request for Quo Single Stage - On Complete 2018-06-1 2018-12-1 2018-08-1 2019-02-2 2019-02- 2019- / Rehabilitation SES of Tok IDA / D1380 Sanitation Development Post Limited 2,226.08 tations e Envelope d 5 1 0 2 06 03-23 mok rayon Chui oblast IDA-SRWSSDP-SW-2018-3 Request for Quo Single Stage - On Complete 2018-06-1 2018-11-2 2018-08-1 2019-02-0 2019-02- 2019- / Rehabilitation SES of Alay IDA / D1380 Sanitation Development Post Limited 1,296.78 tations e Envelope d 5 0 0 6 06 03-10 rayon Osh oblast IDA-SRWSSDP-SW-2018-5 Request for Quo Single Stage - On Complete 2018-06-0 2019-07-1 2018-08-0 2019-09-1 2019-01- 2019- / Rehabilitation SES of Ak- IDA / D1380 Sanitation Development Post Limited 1,492.53 tations e Envelope d 8 2 3 6 30 10-15 Suu rayon Issyk-Kul oblast IDA-SRWSSDP-SW-2018-6 Request for Quo Single Stage - On Complete 2018-06-0 2018-11-2 2018-08-0 2019-02-0 2019-01- 2019- / Rehabilitation SES of Jeti- IDA / D1380 Sanitation Development Post Limited 1,902.71 tations e Envelope d 8 0 3 5 30 03-08 Oguz rayon Issyk-Kul oblas t IDA-SRWSSDP-SW-2018-7 Request for Quo Single Stage - On Complete 2018-06-0 2018-11-2 2018-08-0 2019-02-0 2019-01- 2019- / Rehabilitation SES of Sok IDA / D1380 Sanitation Development Post Limited 2,799.35 tations e Envelope d 8 0 3 4 30 03-04 uluk rayon Chui oblast IDA-SRWSSDP-SW-2018-1 Request for Quo Single Stage - On Complete 2018-06-0 2018-12-1 2018-08-0 2019-02-2 2019-01- 2019- 0 / Rehabilitation SES of Pa IDA / D1380 Sanitation Development Post Limited 2,172.64 tations e Envelope d 8 1 3 0 30 03-21 nfilov rayon Chui oblast IDA-SRWSSDP-SW-2018-8 Request for Quo Single Stage - On Complete 2018-06-0 2018-12-1 2018-08-0 2019-02-2 2019-01- 2019- / Rehabilitation SES of Mos IDA / D1380 Sanitation Development Post Limited 2,044.16 tations e Envelope d 8 1 3 0 30 03-21 kva rayon Chui oblast IDA-SRWSSDP-SW-2018-9 Request for Quo Single Stage - On Complete 2018-06-0 2018-12-1 2018-08-0 2019-02-2 2019-01- 2019- / Rehabilitation SES of Jayil IDA / D1380 Sanitation Development Post Limited 2,757.38 tations e Envelope d 8 1 3 0 30 03-21 rayon Chui oblast IDA-SRWSSDP-SW-2019-1 Request for Quo Single Stage - On Complete 2019-05-0 2019-05-2 2019-07-0 2019-09-0 2019-12- 2020- / Rehabiltation of public co IDA / D1380 Sanitation Development Post Limited 92,102.52 tations e Envelope d 8 9 3 2 30 07-04 nveniences in schools in C hui oblast (2nd phase) IDA-SRWSSDP-SW-2019-2 / Rehabiltation of public co Request for Quo Single Stage - On Complete 2019-05-0 2019-05-2 2019-07-0 2019-08-3 2019-12- 2019- IDA / D1380 Sanitation Development Post Limited 48,414.87 nveniences in schools in Is tations e Envelope d 8 9 3 0 30 12-30 syk-Kul oblast (2nd phase) IDA-SRWSSDP-AF-CW-202 Single Stage - On 190,853.9 Complete 2020-02-1 2020-02-2 2020-02-2 2020-04-0 2020-05-1 2020-05-0 2020-06-0 2020-06-0 2020-07-1 2021-06- 2021- 0-21 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 9 d 8 0 3 5 2 5 4 9 5 09 12-28 er supply system in Chon- Daly IDA-SRWSSDP-DC-CW-20- 1 / Extra works for rehabili Complete 2020-03-1 2020-03-2 2020-03-2 2020-03-2 2020-05-0 2020-05-1 2020-09- 2020- IDA / 59070 Water Supply Investments Post Direct Selection Direct 80,908.48 tation of water supply syst d 8 5 3 6 2 8 01 12-31 em in Kyrgyz-Ata subproje ct IDA-SRWSSDP-DC-CW-20- 2 / Direct contract fo comp 414,547.4 Complete 2020-04-1 2020-04-2 2020-04-1 2020-04-2 2020-05-1 2020-06-1 2020-11- 2020- IDA / 59070 Water Supply Investments Post Direct Selection Direct letion of works in subproje 6 d 0 8 7 9 8 2 14 12-17 ct Darkhan, Jeti-Oguz, Issy k-Kul IDA-SRWSSDP-AF-CW-202 Single Stage - On 453,181.9 Complete 2020-04-3 2020-04-2 2020-05-0 2020-06-1 2020-06-0 2020-07-1 2020-06-2 2020-08-1 2020-07-2 2021-11- 2021- 0-22 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 7 d 0 9 1 2 2 2 9 6 7 19 10-26 er supply system in Chaich y IDA-SRWSSDP-AF-CW-202 Single Stage - On 501,808.1 Complete 2020-06-1 2020-06-0 2020-06-1 2020-07-3 2020-07-0 2020-08-3 2020-08-2 2020-10-0 2020-10-0 2021-10- 2021- 0-23 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 4 d 2 4 9 1 7 0 6 4 6 04 11-30 er supply system in Kenes h IDA-SRWSSDP-AF-CW-202 Single Stage - On 201,497.9 Complete 2020-06-1 2020-06-0 2020-06-1 2020-07-2 2020-07-0 2020-08-2 2020-08-1 2020-10-0 2020-09-2 2021-05- 2021- 0-24 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 5 d 0 9 7 9 8 8 4 2 2 30 09-22 er supply system in Kara- dobo IDA-SRWSSDP-AF-CW-202 Single Stage - On 326,383.1 Complete 2020-07-0 2020-07-0 2020-07-1 2020-08-2 2020-08-0 2020-09-2 2020-09-0 2020-10-3 2020-10-1 2022-02- 2022- 0-25 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 1 d 1 2 5 6 4 5 8 0 2 02 01-13 er supply system in Kenes h Osh oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 238,324.8 Complete 2020-07-0 2020-07-0 2020-07-1 2020-08-2 2020-08-0 2020-09-2 2020-09-0 2020-10-3 2020-10-1 2022-02- 2022- 0-26 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 6 d 1 2 5 6 4 5 8 0 2 02 01-13 er supply system in Por IDA-SRWSSDP-AF-CW-202 Single Stage - On 497,949.8 Complete 2020-11-1 2020-08-1 2020-11-2 2021-01-0 2020-09-1 2021-02-0 2020-09-2 2021-03-1 2020-10-2 2022-06- 2022- 0-29 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National e Envelope 2 d 1 4 5 6 1 5 2 2 0 15 11-30 er supply system in Gorna ya Maevka IDA-SRWSSDP-AF-CW-202 Single Stage - On 347,104.8 Complete 2020-11-1 2020-10-1 2020-11-2 2021-01-0 2020-11-1 2021-02-0 2020-12-1 2021-03-1 2021-01-2 2022-06- 2022- 0-30 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National e Envelope 2 d 1 5 5 6 7 5 8 2 7 15 08-31 er supply system in Beish eke IDA-SRWSSDP-AF-CW-202 Single Stage - On 666,380.9 2020-11-2 2020-11-1 2020-12-0 2021-01-1 2020-12-1 2021-02-1 2021-01-2 2021-03-2 2021-03-2 2022-06- 0-31 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 7 0 2 4 5 5 4 2 1 0 24 er supply system in Ken-B ulun IDA-SRWSSDP-AF-CW-18- Single Stage - On 365,328.7 Complete 2019-07-1 2019-07-1 2019-07-2 2019-09-0 2019-08-0 2019-10-0 2019-09-0 2019-11-1 2019-09-1 2020-11- 2020- 17 / Rehabilitation of wate IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 2 d 9 2 8 8 9 8 2 2 0 11 09-19 r supply system in Ichke-B ulun IDA-SRWSSDP-SW-2020-1 1 / Rehabiltation of public Request for Quo Single Stage - On 129,549.4 Complete 2020-05-2 2020-07-1 2020-08-2 2021-01- 2021- IDA / 60880 Sanitation Development Post Open - National conveniences in schools in tations e Envelope 6 d 0 5 4 11 01-31 Chui oblast (1st phase) IDA-SRWSSDP-SW-2020-9 / Rehabiltation of public co Request for Quo Single Stage - On Complete 2020-05-2 2020-07-1 2020-09-2 2021-01- 2021- IDA / 60880 Sanitation Development Post Open - National 45,124.23 nveniences in schools in Is tations e Envelope d 0 5 8 11 10-20 syk-Kul oblast (1st phase) IDA-SRWSSDP-SW-2020-1 Request for Quo Single Stage - On Complete 2020-05-2 2020-07-1 2020-09-3 2021-01- 2021- 0 / Rehabiltation of public IDA / 60880 Sanitation Development Post Open - National 31,496.41 tations e Envelope d 0 5 0 11 03-30 conveniences in schools in Osh oblast (1st phase) IDA-SRWSSDP-SW-2020-2 Request for Quo Single Stage - On Complete 2020-06-1 2020-08-1 2020-09-3 2021-02- 2020- / Rehabilitation SES of Issy IDA / 60880 Sanitation Development Post Open - National 1,598.85 tations e Envelope d 7 2 0 08 12-01 k-Ata rayon Chui oblast IDA-SRWSSDP-SW-2020-3 Request for Quo Single Stage - On Complete 2020-06-1 2020-08-1 2020-09-3 2021-02- 2020- / Rehabilitation SES of Cho IDA / 60880 Sanitation Development Post Open - National 856.84 tations e Envelope d 7 2 0 08 11-14 n-Alai rayon Osh oblast IDA-SRWSSDP-SW-2020-4 Request for Quo Single Stage - On Complete 2020-09-0 2020-11-0 2020-11-1 2021-05- 2020- / Rehabilitation SES of Ton IDA / 60880 Sanitation Development Post Open - National 2,157.80 tations e Envelope d 9 4 6 03 12-31 rayon Issyk-Kul oblast IDA-SRWSSDP-SW-2020-5 Request for Quo Single Stage - On Complete 2020-09-0 2020-11-0 2020-11-1 2021-05- 2020- / Rehabilitation SES of Ke IDA / 60880 Sanitation Development Post Open - National 2,633.52 tations e Envelope d 9 4 6 03 12-31 min rayon Chui oblast IDA-SRWSSDP-SW-2020-6 Request for Quo Single Stage - On 2020-06-1 2020-08-1 2021-02- / Rehabilitation SES of Kar IDA / 60880 Sanitation Development Post Open - National 0.00 Canceled tations e Envelope 7 2 08 a-Suu rayon Osh oblast Page 1 IDA-SRWSSDP-SW-2020-1 Request for Quo Single Stage - On Complete 2020-09-0 2020-11-0 2020-11-1 2021-05- 2020- / Rehabilitation SES of Issy IDA / 60880 Sanitation Development Post Open - National 2,408.66 tations e Envelope d 9 4 6 03 12-31 k-Kul rayon Issyk-Ku oblast IDA-SRWSSDP-SW-2020-7 Request for Quo Single Stage - On Complete 2020-06-1 2020-08-1 2020-09-3 2021-02- 2020- / Rehabilitation SES of Ara IDA / 60880 Sanitation Development Post Open - National 1,898.71 tations e Envelope d 7 2 0 08 11-14 van rayon Osh oblast IDA-SRWSSDP-SW-2020-8 Request for Quo Single Stage - On Complete 2020-09-0 2020-11-0 2020-11-1 2021-05- 2020- / Rehabilitation SES of Ala IDA / 60880 Sanitation Development Post Open - National 1,939.93 tations e Envelope d 9 4 6 03 12-31 mudun rayon Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 711,498.4 Complete 2021-01-0 2021-01-0 2021-01-0 2021-02-1 2021-02-0 2021-03-1 2021-05-2 2021-04-2 2021-06-3 2022-04- 2023- 1-1 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National e Envelope 1 d 1 7 6 7 9 9 1 3 0 23 01-10 r supply system in Kara-Ji gach Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On Complete 2022-01-1 2022-12-0 2022-01-2 2022-12-0 2022-03-0 2022-12-3 2022-04-0 2023-03-2 2022-05-0 2023-05-0 2023-05- 2024- 2-1 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 e Envelope d 5 2 0 2 3 0 2 4 7 4 07 08-19 r supply system in Kayrm a Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2022-01-1 2022-08-2 2022-01-2 2022-08-2 2022-03-0 2022-09-2 2022-04-0 2022-11-1 2022-05-0 2022-12-2 2023-05- 2-2 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 5 5 0 5 3 3 2 1 7 9 07 r supply system in Vasilev Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2022-08-2 2021-09-0 2022-08-2 2021-10-1 2022-09-2 2021-11-1 2022-11-1 2021-12-2 2022-12-2 2022-12- 1-2 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 5 6 5 8 3 7 1 2 7 22 er supply system in Komso molskoe Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2023-05-2 2021-09-0 2021-10-1 2023-06-2 2021-11-1 2023-09-0 2021-12-2 2023-10-1 2022-12- 1-3 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 6 6 8 3 7 7 2 2 22 r supply system in Bokso-J ol Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 1,630,213 2021-09-0 2021-11-0 2021-09-0 2021-11-0 2021-10-1 2021-12-0 2021-11-1 2022-01-2 2021-12-2 2022-02-2 2022-12- 1-4 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National Signed e Envelope .88 1 5 6 5 8 7 7 7 2 6 22 r supply system in Sosnov ka Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 778,341.9 2021-01-0 2021-02-0 2021-01-0 2021-02-0 2021-02-1 2021-03-1 2021-03-1 2021-05-3 2021-04-2 2021-07-1 2022-04- 1-5 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 5 1 4 6 4 7 0 9 1 3 3 23 r supply system in Ivanov ka station Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On Complete 2022-01-1 2022-12-2 2022-01-2 2022-12-2 2022-03-0 2023-01-2 2022-04-0 2023-03-2 2022-05-0 2023-05-0 2023-05- 2024- 2-3 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 e Envelope d 5 3 0 6 3 4 2 4 7 4 07 10-01 r supply system in Kurpul dok Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On Complete 2022-01-1 2022-12-0 2022-01-2 2022-03-0 2023-01-1 2022-04-0 2023-03-2 2022-05-0 2023-05-0 2023-05- 2024- 2-5 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 e Envelope d 5 9 0 3 0 2 8 7 3 07 10-17 r supply system in Orto-Ar yk Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 397,761.3 2021-09-0 2021-09-2 2021-09-0 2021-09-2 2021-10-1 2021-10-2 2021-11-1 2021-12-0 2021-12-2 2021-12-1 2022-12- 1-6 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 5 1 4 6 4 8 6 7 2 2 5 22 r supply system in Kaindy Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 467,510.5 2021-09-0 2021-05-1 2021-09-0 2021-05-1 2021-10-1 2021-06-0 2021-11-1 2021-07-0 2021-12-2 2021-08-1 2022-12- 1-7 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 3 1 1 6 1 8 9 7 2 2 1 22 r supply system in Borold oi Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2022-06-0 2021-09-0 2022-06-2 2021-10-1 2022-07-1 2021-11-1 2022-08-1 2021-12-2 2022-09-2 2022-12- 1-8 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 3 6 8 8 3 7 9 2 6 22 r supply system in Buloluu Osh oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2022-10-2 2021-09-0 2022-10-2 2021-10-1 2022-11-2 2021-11-1 2023-03-0 2021-12-2 2023-03-2 2022-12- 1-9 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 8 6 8 8 9 7 2 2 2 22 r supply system in Toloiko n Osh oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On Complete 2021-09-0 2022-06-0 2021-09-0 2022-06-0 2021-10-1 2022-07-0 2021-11-1 2022-08-1 2021-12-2 2022-09-2 2022-12- 2023- 1-10 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 e Envelope d 1 3 6 3 8 5 7 9 2 6 22 11-22 er supply system in Erkin- Too Osh oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2022-12-2 2021-09-0 2022-12-2 2021-10-1 2023-01-2 2021-11-1 2023-03-0 2021-12-2 2023-04-2 2022-12- 1-11 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 3 6 6 8 4 7 2 2 2 22 er supply system in Kyzyl- Bairak Osh oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2022-01-2 2021-09-0 2022-01-2 2021-10-1 2022-02-2 2021-11-1 2022-04-1 2021-12-2 2022-04-2 2022-12- 1-12 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 5 6 5 8 2 7 4 2 6 22 er supply system in Kabyk Osh oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2022-06-1 2021-09-0 2022-06-1 2021-10-1 2022-07-1 2021-11-1 2022-09-0 2021-12-2 2022-10-0 2022-12- 1-13 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 0 6 0 8 2 7 2 2 3 22 er supply system in Enchil esh Issyk-Kul oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 974,367.2 2021-06-0 2021-06-1 2021-06-0 2021-06-1 2021-07-1 2021-07-1 2021-08-1 2021-08-0 2021-09-2 2021-09-2 2022-09- 1-14 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 5 1 1 6 1 8 3 7 5 1 0 21 er supply system in Jeti-O guz Issyk-Kul oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 267,037.1 2021-06-0 2021-03-0 2021-06-0 2021-03-0 2021-07-1 2021-04-0 2021-08-1 2021-04-2 2021-09-2 2021-05-2 2022-09- 1-15 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 0 1 2 6 2 8 1 7 0 1 2 21 er supply system in Boz-B eshik Issyk-Kul oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2022-04-0 2021-09-0 2022-04-0 2021-10-1 2022-04-2 2021-11-1 2022-07-0 2021-12-2 2022-12- 1-16 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Canceled e Envelope 1 1 6 1 8 9 7 5 2 22 er supply system in Barbu lak Issyk-Kul oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2023-05-2 2021-09-0 2021-10-1 2023-06-2 2021-11-1 2023-08-1 2021-12-2 2023-10-0 2022-12- 1-17 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 6 6 8 3 7 8 2 3 22 er supply system in Kurm ontu Issyk-Kul oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2023-07-2 2021-09-0 2021-10-1 2023-08-1 2021-11-1 2023-11-0 2021-12-2 2023-11-1 2022-12- 1-18 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 1 6 8 8 7 3 2 3 22 er supply system in Kichi- Oruktuu Issyk-Kul oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2022-04-2 2021-09-0 2022-04-2 2021-10-1 2022-05-2 2021-11-1 2022-06-2 2021-12-2 2022-08-0 2022-12- 1-19 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 2 6 2 8 0 7 8 2 8 22 er supply system in Jyluu- Bulak Issyk-Kul oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-06-0 2022-11-1 2021-06-0 2022-11-1 2021-07-1 2022-12-1 2021-08-1 2023-03-3 2021-09-2 2023-05-0 2022-09- 1-20 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 1 6 1 8 3 7 1 1 4 21 er supply system in Grigor evka Issyk-Kul oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 204,124.6 Complete 2020-11-2 2020-11-2 2020-12-1 2021-01-2 2020-12-2 2021-02-2 2021-04-1 2021-03-2 2021-05-1 2022-07- 2023- 0-27-RT-1 / Rehabilitation IDA / 60880 Water Supply Investments Post Request for Bids Open - National e Envelope 8 d 7 6 1 2 9 1 6 8 9 01 10-27 of water supply system in Kyzyl-Jar IDA-SRWSSDP-AF-CW-202 Single Stage - On 373,946.3 Complete 2020-11-2 2020-11-2 2020-12-1 2021-01-2 2020-12-2 2021-02-2 2021-04-1 2021-03-2 2021-05-1 2022-07- 2023- 0-28-RT-1 / Rehabilitation IDA / 60880 Water Supply Investments Post Request for Bids Open - National e Envelope 6 d 7 7 1 2 9 1 6 8 9 01 08-02 of water supply system in Koo-Chaty IDA-SRWSSDP-AF-CW-202 Single Stage - On 2020-08-1 2020-08-2 2020-08-3 2020-10-1 2020-09-2 2020-11-1 2020-12-1 2022-03- 0-27 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National 0.00 Canceled e Envelope 7 0 1 2 2 1 6 21 er supply system in Kyzyl- Jar IDA-SRWSSDP-AF-CW-202 Single Stage - On 2020-08-1 2020-08-2 2020-08-3 2020-10-1 2020-09-2 2020-11-1 2020-12-1 2022-03- 0-28 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National 0.00 Canceled e Envelope 7 1 1 2 2 1 6 21 er supply system in Koo-C haty National Pr IDA-SRWSSDP-NCB-SW-20 ocurement 22-1 / Rehabiltation of out Document Single Stage - On 2022-08-1 2022-08-1 2022-09-1 2022-10-1 2022-11-1 2023-04- door public conveniences i IDA / D1380 Sanitation Development Post Request for Bids Open - National - 1 Envelop 0.00 Canceled e Envelope 0 7 4 4 8 17 n schools in Chui, Issyk-Kul e process ( and Osh oblasts 1st phase Non Bank- (3 lots) SPD) National Pr IDA-SRWSSDP-AW-2022-1 ocurement / Additional works for reha Single Stage - On Document Complete 2022-08-1 2022-09-0 2022-08-1 2022-09-0 2022-09-3 2023-01-1 2022-10-3 2023-03-3 2022-12-0 2023-05-0 2023-06- 2023- IDA / 59070 Water Supply Investments Post Request for Bids Open - National 0.00 bilitation of water supply s e Envelope - 1 Envelop d 7 2 9 2 0 0 0 1 4 4 02 11-03 ystem in Sultan subproject e process ( Non Bank- SPD) National Pr IDA-SRWSSDP-AF-CW-202 ocurement 1-16-2 / Rehabilitation of w Single Stage - On 2022-08-2 2022-09-0 2022-09-0 2022-09-0 2022-10-2 2022-09-3 2022-11-2 2022-11-2 2022-12-2 2022-12-2 2024-03- IDA / 60880 Water Supply Investments Post Request for Bids Open - National Document 0.00 Signed ater supply system in Barb e Envelope 8 2 9 2 1 0 0 1 5 7 24 - 1 Envelop ulak Issyk-Kul oblast e process ( Request Non Bank-for IDA-SRWSSDP-SW-2023-1 SPD) - Smal Bids / Rehabiltation of public co Single Stage - On l Works SP 2023-04-1 2023-04-1 2023-05-0 2023-06-0 2023-06-0 2023-10- IDA / D1380 Sanitation Development Post Request for Bids Open - National 0.00 Canceled nveniences in schools in O e Envelope D (1 envelo 4 8 2 1 3 01 sh oblast 2nd Phase (4 lot pe process s) ) Request for IDA-SRWSSDP-AF-CW-202 Bids - Smal Single Stage - On 2023-05-0 2023-05-1 2023-05-1 2023-06-2 2023-06-1 2023-07-2 2023-08-1 2023-08-2 2023-10-1 2024-08- 3-1 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National l Works SP 0.00 Signed e Envelope 5 9 0 1 6 1 0 5 2 24 r supply system in Kichi-B D (1 envelo uloluu pe process ) Request for IDA-SRWSSDP-AF-SW-202 Request for Quo Single Stage - On Quotations 2023-06-1 2023-08-0 2023-08-1 2023-11- 3-1 / Rehabiltation of publi IDA / D1380 Sanitation Development Post Open - National 0.00 Signed tations e Envelope (Non Bank- 4 7 8 05 c conveniences in schools i SPD) n Chuy oblast (2 lots) IDA-SRWSSDP-AF-SW-202 Request for 3-2 / Rehabiltation of publi Request for Quo Single Stage - On Quotations 2023-06-1 2023-08-0 2023-11- IDA / D1380 Sanitation Development Post Open - National 0.00 Canceled c conveniences in schools i tations e Envelope (Non Bank- 4 7 05 n Osh oblast Kara-Suu ray SPD) on Kyzyl-Suu а/а Request for IDA-SRWSSDP-СW-2023-1 Bids - Smal -RT1 / Rehabiltation of pub Single Stage - On l Works SP 2023-06-1 2023-06-2 2023-07-0 2023-08-0 2023-08-0 2023-12- IDA / D1380 Sanitation Development Post Request for Bids Open - National 0.00 Canceled lic conveniences in schools e Envelope D (1 envelo 6 0 4 3 5 03 in Osh oblast 2nd Phase ( pe process 4 lots) ) IDA-SRWSSDP-AF-СW-202 Request for 3-3 / Rehabiltation of publi Request for Quo Single Stage - On Quotations 2023-08-0 2023-09-2 2023-12- IDA / D1380 Sanitation Development Post Open - National 0.00 Canceled c conveniences in schools i tations e Envelope (Non Bank- 4 7 26 n Issyk-Kul oblast (4 lots) SPD) IDA-SRWSSDP-AF-СW-202 Request for 3-5 / Additional works on r Request for Quo Single Stage - On Quotations Complete 2023-07-3 2023-09-1 2023-12-1 2023-12- 2024- IDA / 60880 Water Supply Investments Post Open - National 0.00 ehabilitation of water supp tations e Envelope (Non Bank- d 0 3 4 12 09-27 ly system in Korul village o SPD) f Alai district of Osh oblast IDA-SRWSSDP-AF-СW-202 Request for 3-2-RT1 / Rehabiltation of Request for Quo Single Stage - On Quotations 2023-09-0 2023-10-2 2023-10-2 2024-01- IDA / D1380 Sanitation Development Post Open - National 0.00 Signed public conveniences in sch tations e Envelope (Non Bank- 6 2 0 20 ools in Osh oblast Kara-Su SPD) u rayon Kyzyl-Suu а/а Request for IDA-SRWSSDP-AF-СW-202 Request for Quo Single Stage - On Quotations 2023-10-0 2023-11-2 2023-12-2 2024-03- 3-3-RT1 / Rehabiltation of IDA / D1380 Sanitation Development Post Open - National 0.00 Signed tations e Envelope (Non Bank- 8 4 7 11 public conveniences in sch SPD) ools in Issyk-Kul oblast IDA-SRWSSDP-CW-2023-1 Request for -RT2-L4 / Construction of a Request for Quo Single Stage - On Quotations 2023-07-1 2023-09-0 2023-08-1 2024-01- IDA / D1380 Sanitation Development Post Open - National 0.00 Signed n outdoor toilet for Borko L tations e Envelope (Non Bank- 6 3 1 01 yceum in Boko village, Noo SPD) kat rayon, Osh oblast. (4 lo t) IDA-SRWSSDP-CW-2023-1 Request for -RT1 / Rehabiltation of pub Request for Quo Single Stage - On Quotations 2023-06-2 2023-08-2 2023-08-1 2023-12- IDA / D1380 Sanitation Development Post Open - National 0.00 Signed lic conveniences in schools tations e Envelope (Non Bank- 8 8 1 30 in Osh oblast 2nd Phase 4 l SPD) ots Request for IDA-SRWSSDP-AF-СW-202 Request for Quo Single Stage - On Quotations 2024-03-1 2024-05-0 2024-05-1 2024-09- 4-1 / Rehabilitation of sanit IDA / D1380 Sanitation Development Post Open - National 0.00 Signed tations e Envelope (Non Bank- 1 4 7 01 ary facilities in kindergarte SPD) ns Osh oblast (2 lots) IDA-SRWSSDP-AF-СW-202 Request for 4-2 / Rehabilitation of sanit Request for Quo Single Stage - On Quotations 2024-03-1 2024-05-0 2024-09- ary facilities of "Baicheche IDA / D1380 Sanitation Development Post Open - National 0.00 Canceled tations e Envelope (Non Bank- 1 4 01 key" kindergarten located i SPD) n Tamga village, Jeti-Oguz rayon, Issyk-Kul oblast IDA-SRWSSDP-AF-СW-202 Request for 3-4 / Rehabilitation of sanit Request for Quo Single Stage - On Quotations 2024-03-1 2024-04-2 2024-05-1 2024-08- IDA / D1380 Sanitation Development Post Open - National 0.00 Signed ary facilities in schools and tations e Envelope (Non Bank- 1 0 1 18 kindergartens Chui oblast SPD) (4 lots) IDA-SRWSSDP-AF2-СW-RF B-2023-3 / Works for impro Request for Pending I vement of sewerage dispo Request for Quo Single Stage - On Quotations 2024-07-1 2024-10-1 2025-03- IDA / 74700 Sanitation Development Post Open - National 0.00 mplement sal systems for milti-storey tations e Envelope (Non Bank- 5 1 10 ation apartment buldings in sub SPD) projects Kurmontu and Ak- Bulak Issyk-Kul region IDA-SRWSSDP-AF-СW-202 Request for 4-2/RT1 / Rehabilitation of Request for Quo Single Stage - On Quotations 2024-04-0 2024-05-2 2024-05-1 2024-11- sanitary facilities of "Baich IDA / D1380 Sanitation Development Post Open - National 0.00 Signed tations e Envelope (Non Bank- 2 8 1 24 echekey" kindergarten loc SPD) ated in Tamga village, Jeti- Oguz rayon, Issyk-Kul obla st IDA-SRWSSDP-AF-СW-202 Request for 3-4-L1-RT1 / Rehabilitation Request for Quo Single Stage - On Quotations 2024-04-0 2024-05-2 2024-05-1 2024-11- of sanitary facilities of Sos IDA / D1380 Sanitation Development Post Open - National 0.00 Signed tations e Envelope (Non Bank- 2 8 1 24 novka school. "Sosnovka" l SPD) ocated in Sosnovka village , Zhayl rayon, Chui oblast IDA-SRWSSDP-AF-СW-202 Request for 4-1-L2/R1 / Rehabilitation Request for Quo Single Stage - On Quotations 2024-04-0 2024-05-2 2024-05-1 2024-11- of sanitary facilities of the IDA / D1380 Sanitation Development Post Open - National 0.00 Signed tations e Envelope (Non Bank- 2 8 7 24 Keremet-Balachak kinderg SPD) arten located in Toloykon village, Kara-Suu rayon, Os h oblast IDA-SRWSSDP-CW-2018-1 Single Stage - On 2018-08-2 2018-09-0 2018-10-1 2018-11-1 2018-12-1 2019-06- 3 / Rehabilitation of water IDA / 59070 Water Supply Investments Post Request for Bids Open - National 0.00 Canceled e Envelope 9 3 5 4 9 17 supply system in Gulbar Page 2 Request for IDA-SRWSSDP-CW-2024-1 Bids - Smal Single Stage - On 2024-04-1 2024-05-1 2024-04-1 2024-06-2 2024-06-1 2024-07-2 2024-08-0 2024-08-2 2024-09-2 2026-02- / Rehabilitation of water su IDA / 59070 Water Supply Investments Post Request for Bids Open - National l Works SP 0.00 Signed e Envelope 8 0 8 7 9 7 2 6 4 25 pply system in Gulbar (4 l D (1 envelo ots) pe process Request ) for IDA-SRWSSDP-AF2-СW-RF Bids - Smal Under Imp Single Stage - On 2024-01-1 2024-08-0 2024-01-1 2024-02-2 2024-09-1 2024-04-2 2024-11-0 2024-05-0 2025-11- B-2023-1 / Rehabilitation o IDA / 59070 Water Supply Investments Post Request for Bids Open - National l Works SP 0.00 lementati e Envelope 0 2 0 1 3 1 1 6 05 f water supply system in D (1 envelo on Otuz Adyr (4 lots) pe process Request ) for IDA-SRWSSDP-AF-CW-202 Bids - Smal Single Stage - On 2024-08-1 2024-08-1 2024-08-1 2024-09-2 2024-09-1 2024-10-2 2024-09-3 2024-11-2 2024-10-3 2025-11- 1-21 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National l Works SP 0.00 Signed e Envelope 2 5 3 4 6 4 0 8 0 23 er supply system in Karool D (1 envelo -Dobo Issyk-Kul oblast pe process Request ) for IDA-SRWSSDP-AF-CW-202 Bids - Smal Pending I Single Stage - On 2025-03-0 2025-03-0 2025-03-0 2025-04-0 2025-05-1 2026-05- 2-4 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National l Works SP 0.00 mplement e Envelope 1 6 8 7 2 12 r supply system in Kum-Ar D (1 envelo ation yk Chui oblast pe process ) Request for IDA-SRWSSDP-AF-СW-202 Pending I Request for Quo Single Stage - On Quotations 2025-01-1 2025-03-1 2025-07- 5-1 / Rehabilitation of sanit IDA / D1380 Sanitation Development Post Open - National 0.00 mplement tations e Envelope (Non Bank- 5 0 08 ation facilities at rural clini ation SPD) cs in Issyk-Kul Oblast Request for IDA-SRWSSDP-AF-СW-202 Pending I Request for Quo Single Stage - On Quotations 2025-01-1 2025-03-1 2025-07- 5-2 / Rehabilitation of sanit IDA / D1380 Sanitation Development Post Open - National 0.00 mplement tations e Envelope (Non Bank- 5 0 08 ation facilities at rural clini ation SPD) cs in Osh Oblast GOODS Activity Reference No. Bid Evaluation Repo Loan / Credit Market Approa Procurement Pr Prequalificatio Actual Amou Process S Draft Pre-qualificatio Prequalification Eval Draft Bidding Docu Specific Procuremen Bidding Documents Proposal Submission / Description Component Review Type Method rt and Recommenda Signed Contract Contract Completion No. ch ocess n (Y/N) nt (US$) tatus n Documents uation Report ment / Justification t Notice / Invitation as Issued / Opening / Minutes tion for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDA-SRWSSDP-GOODS-20 Institutional Strengthenin Request for Quo Single Stage - On 2017-01-2 2017-03-2 2017-03-2 2017-09-1 2017-05-2 IDA / D1380 Post Open - National 36,405.43 Completed 17-1 / Purchase of vehicle g tations e Envelope 3 0 3 6 3 for DWWSD IDA-SRWSSDP-GOODS-20 Request for Quo Single Stage - On 2017-02-0 2017-04-0 2017-04-1 2017-10-0 2017-05-1 17-2 / Supply of computer IDA / D1380 Project Management Post Open - National 27,439.86 Completed tations e Envelope 7 4 2 1 2 equipment for ARIS IDA-SRWSSDP-G-2018-11 Institutional Strengthenin Request for Quo Single Stage - On 2018-08-0 2018-09-2 2018-09-1 2019-03-2 2018-11-3 / Supply of computer equip IDA / D1380 Post Open - National 47,378.98 Completed g tations e Envelope 3 8 1 7 0 ment 13 for billing system IDA-SRWSSDP-G-2019-13 Institutional Strengthenin Request for Quo Single Stage - On 2019-07-0 2019-08-2 2019-02-1 2020-02-2 2019-04-0 / Purchase of goods for C IDA / 59070 Post Open - National 23,040.88 Completed g tations e Envelope 4 9 7 5 3 DWUUs for 13 sub-projects IDA-SRWSSDP-G-2019-14 / Purchase of goods for 27 Institutional Strengthenin Request for Quo Single Stage - On 2019-07-0 2019-08-2 2020-02-2 IDA / 59070 Post Open - National 0.00 Canceled CDWUUs on competion ba g tations e Envelope 4 9 5 sis (multiple contracts) IDA-SRWSSDP-G-2019-15 Institutional Strengthenin Single Stage - On 2019-05-0 2019-05-0 2019-06-1 2019-07-1 2019-08-2 2020-02-1 / Purchase of special mach IDA / 59070 Post Request for Bids Open - National 0.00 Canceled g e Envelope 1 6 7 7 1 7 inery for Ayil Okmotu IDA-SRWSSDP-GOODS-20 Institutional Strengthenin Request for Quo Single Stage - On 2018-04-3 2018-06-2 2018-05-0 2018-12-2 2018-06-1 18-6_1 / Purchase of auto IDA / D1380 Post Open - National 1,144.71 Completed g tations e Envelope 0 5 4 2 0 matic telephone system f or DWWSD IDA-SRWSSDP-GOODS-20 Request for Quo Single Stage - On 2018-07-0 2018-07-0 2018-09-0 2018-09-0 2019-03-0 2018-11-2 18-7 / Supply of Computer IDA / 59070 Sanitation Development Post Limited 39,021.28 Completed tations e Envelope 8 6 2 8 1 1 equipment for SES IDA-SRWSSDP-NCB-G-201 Single Stage - On 2018-09-0 2019-02-0 2018-09-1 2018-10-2 2019-02-2 2018-11-2 2019-03-2 2018-12-2 2019-07-1 2019-06-2 2019-08-0 8-9 / Purchase of watermet IDA / D2040 Water Supply Investments Post Request for Bids Open - National 185,827.43 Completed e Envelope 6 1 1 3 8 2 9 7 1 5 5 ers for Sultan, Kurama and Kyrgyz-Ata. IDA-SRWSSDP-NCB-G-201 Single Stage - On 2018-08-3 2019-03-2 2018-09-0 2018-10-1 2019-04-1 2018-11-1 2019-08-2 2018-12-2 2019-12-1 2019-06-2 2020-03-1 8-6 / Supply of laboratory IDA / 59070 Sanitation Development Post Request for Bids Open - National 175,835.38 Completed e Envelope 1 2 7 9 9 8 1 3 2 1 2 equipment for rayon SES IDA-SRWSSDP-G-SIASAR-2 Institutional Strengthenin Request for Quo Single Stage - On 2019-02-1 2019-02-0 2019-04-1 2019-04-2 2019-10-0 2019-05-2 019-1 / Supply of compute TF / A1605 Post Limited 6,742.31 Completed g tations e Envelope 3 1 0 7 7 5 r equipment for SIASAR te am IDA-SRWSSDP-G-2018-10 / Purchase of watermeters Institutional Strengthenin Request for Quo Single Stage - On 2018-07-2 2018-09-1 2019-03-1 IDA / 59070 Post Open - National 0.00 Canceled Sary-Tash, Achyk-Suu, Kun g tations e Envelope 0 4 3 -tuu, Alekseevka, Kyzyl-Tu u, Tolok IDA-SRWSSDP-GOODS-20 18-10 / Purchase of water Institutional Strengthenin Single Stage - On 2019-05-0 2019-05-1 2019-05-0 2019-06-1 2019-06-2 2019-07-1 2019-06-2 2019-08-2 2019-08-1 2020-02-1 2020-01-0 IDA / D1380 Post Request for Bids Open - National 154,007.32 Completed meters Kun-tuu, Alekseevk g e Envelope 1 6 8 9 8 9 8 3 9 9 1 a, Kyzyl-Tuu, Tolok, Korul a nd Ichke-Bulun IDA-SRWSSDP-GOODS-20 Request for Quo Single Stage - On 2018-05-1 2018-05-0 2018-07-1 2018-07-0 2018-09-0 2018-08-1 IDA / 59070 Project Management Post Limited 20,499.19 Completed 18-6 / Supply of technical tations e Envelope 5 8 0 1 8 3 equipment IDA-SRWSSDP-GOODS-20 Institutional Strengthenin Request for Quo Single Stage - On 2017-11-0 2017-11-0 2018-01-0 2018-01-2 2018-06-3 2018-05-2 IDA / D1380 Post Limited 10,971.16 Completed 17-5 / Purchase of waterm g tations e Envelope 6 8 1 6 0 9 eters for Togotoi IDA-SRWSSDP-GOODS-20 Request for Quo Single Stage - On 2017-04-1 2017-04-2 2017-06-1 2017-06-1 2017-12-0 2017-09-0 IDA / 59070 Project Management Post Limited 22,012.83 Completed 17-3 / Supply of 2 piece au tations e Envelope 7 4 2 1 9 3 to for ARIS IDA-SRWSSDP-GOODS-RF Q-20-1 / Purchase of chlori Request for Quo Single Stage - On 2020-04-1 2020-04-1 2020-05-2 2020-05-1 2020-06-2 2020-05-2 IDA / 59070 Sanitation Development Post Limited 25,503.94 Completed ne for disinfection of publi tations e Envelope 3 5 1 4 0 0 c/social institutions and pu blic places IDA-SRWSSDP-G-2020-1 / Institutional Strengthenin Request for Quo Single Stage - On 2020-06-0 2020-08-0 2020-08-0 2020-08-3 2020-08-2 Supply of computer equip IDA / D1380 Post Open - National 9,637.33 Completed g tations e Envelope 6 1 5 1 7 ment 12 for billing system IDA-SRWSSDP-G-2020-3 / Purchase of watermeters f Institutional Strengthenin Request for Quo Single Stage - On 2020-06-2 2020-08-1 2020-11-0 2020-11-1 2020-12-2 IDA / D1380 Post Open - National 33,272.37 Completed or Darkan and Chelpek su g tations e Envelope 3 8 1 6 7 bprojects Issyk-Kul oblast IDA-SRWSSDP-G-2020-4 / Institutional Strengthenin Request for Quo Single Stage - On 2020-06-2 2020-08-1 2020-11-1 Purchase of goods for CD IDA / 59070 Post Open - National 0.00 Canceled g tations e Envelope 3 8 6 WUUs of WSS sub-projects IDA-SRWSSDP-G-2021-2 / Request for Quo Single Stage - On 2021-07-0 2021-09-0 2021-05-0 2022-02-2 2021-05-3 Supply of computer equip IDA / 60880 Sanitation Development Post Open - National 16,201.71 Completed tations e Envelope 7 1 1 8 0 ment for 14 rayons SES IDA-SRWSSDP-G-2021-3 / Institutional Strengthenin Request for Quo Single Stage - On 2021-07-0 2021-09-0 2021-05-1 2022-02-2 2021-05-3 Supply of computer equip IDA / 60880 Post Open - National 13,531.05 Completed g tations e Envelope 7 1 1 8 0 ment 30 for billing system IDA-SRWSSDP-G-2021-4 / Institutional Strengthenin Single Stage - On 2022-01-1 2022-01-1 2022-02-2 2022-03-2 2022-05-0 2022-10-2 Purchase of goods for CD IDA / 60880 Post Request for Bids Open - National 0.00 Canceled g e Envelope 0 5 6 8 2 9 WUUs for 42 sub-projects ( multiple contracts) IDA-SRWSSDP-G-2022-1 / Institutional Strengthenin Single Stage - On 2022-09-0 2022-09-0 2022-10-1 2022-11-1 2022-12-2 2023-06-2 Purchase of special machi IDA / 60880 Post Request for Bids Open - National 0.00 Canceled g e Envelope 1 6 8 7 2 0 nery for Ayil Okmotu IDA-SRWSSDP-G-2022-2 / Institutional Strengthenin Request for Quo Single Stage - On 2022-09-0 2022-11-0 2023-04-3 IDA / 60880 Post Open - National 0.00 Canceled Purchase of goods for DW g tations e Envelope 6 1 0 WSD IDA-SRWSSDP-G-2022-3 / Institutional Strengthenin Single Stage - On 2022-09-0 2022-09-0 2022-10-1 2022-11-1 2022-12-2 2023-06-2 IDA / 60880 Post Request for Bids Open - National 0.00 Canceled Goods for Training Center g e Envelope 1 6 8 7 2 0 IDA-SRWSSDP-G-2021-5 / Request for Quo Single Stage - On Pending Im 2021-09-0 2021-11-0 2022-05-0 IDA / 60880 Project Management Post Open - National 0.00 Technical-engineering equi tations e Envelope plementati 7 2 1 pment for ARIS on IDA-SRWSSDP-G-2021-6 / Pending Im Request for Quo Single Stage - On 2021-09-0 2021-11-0 2022-05-0 Supply of computer and o IDA / 60880 Project Management Post Open - National 0.00 plementati tations e Envelope 7 2 1 ffice equipment for ARIS on IDA-SRWSSDP-G-2020-2 / Supply of computer equip Request for Quo Single Stage - On 2020-07-0 2020-06-1 2020-08-2 2020-09-2 ment for Republican cent IDA / D1380 Sanitation Development Post Open - National 0.00 Canceled tations e Envelope 1 9 6 5 er for health promotion an d mass communication un der GOKR IDA-SRWSSDP-G-2020-4-R Institutional Strengthenin Request for Quo Single Stage - On 2021-02-1 2021-03-0 2021-04-0 2021-07-0 T-1 / Purchase of goods for IDA / 59070 Post Open - National 0.00 Canceled g tations e Envelope 0 1 7 6 CDWUUs of WSS sub-proje cts IDA-SRWSSDP-G-2021-1 / Single Stage - On 2021-02-0 2021-02-1 2021-03-2 2021-04-2 2021-05-2 2021-11-2 Supply of laboratory equip IDA / 59070 Sanitation Development Post Request for Bids Open - National 0.00 Canceled e Envelope 5 0 4 3 8 4 ment for 11 rayons 2 Lots IDA-SRWSSDP-G-2020-2-R T-1 / Supply of computer e Request for Quo Single Stage - On 2020-07-0 2020-08-3 2020-12-0 2021-02-2 2020-12-2 quipment for Republican c IDA / 60880 Sanitation Development Post Open - National 2,350.90 Completed tations e Envelope 6 1 8 7 2 enter for health promotion and mass communication under GOKR IDA-SRWSSDP-G-2019-16 Institutional Strengthenin Single Stage - On 2023-08-0 2023-08-0 2023-09-1 2023-10-1 2023-11-2 2024-05-1 / Purchase of watermeters IDA / 59070 Post Request for Bids Open - National 0.00 Canceled g e Envelope 1 6 7 7 1 9 for Otuz Adyr, Gulbar IDA-SRWSSDP-G-2020-4-R Institutional Strengthenin Request for Quo Single Stage - On 2021-08-2 2021-10-2 2021-09-2 2022-01-2 2021-10-2 T-2 / Purchase of goods fo IDA / 59070 Post Open - National 70,319.55 Completed g tations e Envelope 0 9 4 7 0 r CDWUUs of WSS sub-proj ects IDA-SRWSSDP-G-2021-7 / Institutional Strengthenin Request for Quo Single Stage - On 2021-09-2 2021-11-2 2021-12-1 2022-02-2 2022-01-0 Purchase of goods for 19 C IDA / 59070 Post Open - National 65,782.63 Completed g tations e Envelope 0 9 0 7 6 DWUUs of WSS sub-project s IDA-SRWSSDP-RFQ-GOOD Institutional Strengthenin Request for Quo Single Stage - On 2022-03-0 2022-05-0 2023-03-2 2022-07-0 2023-03-2 S-2022-1 / Purchase of spe IDA / 60880 Post Open - National 0.00 Completed g tations e Envelope 9 5 2 4 2 cial machinery for Sultan s ubproject IDA-SRWSSDP-AF-G-2022- Institutional Strengthenin Request for Quo Single Stage - On 2022-02-2 2022-03-3 2022-04-0 2022-04-1 2022-04-2 4 / Purchase of furniture fo IDA / D2040 Post Open - National 0.00 Completed g tations e Envelope 3 0 6 3 9 r DWWSD conference-roo m IDA-SRWSSDP-AF-G-2021- Institutional Strengthenin Request for Quo Single Stage - On 2021-09-2 2021-12-3 2021-12-3 2022-03-0 2022-03-2 1 / Purchase of conference IDA / D2040 Post Open - National 20,558.94 Completed g tations e Envelope 4 1 1 1 5 equipment for DWWSD IDA-SRWSSDP-G-2021-1-R Single Stage - On 2022-03-1 2022-03-1 2022-03-1 2022-03-1 2022-04-1 2022-04-1 2022-05-1 2022-06-2 2022-12-1 T-2 / Supply of laboratory IDA / 59070 Sanitation Development Post Request for Bids Open - National 0.00 Canceled e Envelope 0 1 8 1 7 2 7 1 8 equipment for 11 rayons IDA-SRWSSDP-G-2021-1-R Single Stage - On 2021-08-0 2021-08-0 2021-08-1 2021-09-1 2021-09-1 2021-10-1 2021-11-1 2022-05-1 T-1 / Supply of laboratory IDA / 59070 Sanitation Development Post Request for Bids Open - National 0.00 Canceled e Envelope 6 2 3 0 4 0 4 3 equipment for 11 rayons IDA-SRWSSDP-RFQ-GOOD Institutional Strengthenin Request for Quo Single Stage - On 2022-04-1 2022-06-1 2022-07-0 2022-08-1 2022-08-0 S-2022-1-RT-1 / Purchase IDA / 60880 Post Open - National 0.00 Completed g tations e Envelope 6 2 8 1 5 of special machinery for S ultan subproject IDA-SRWSSDP-G-2022-4 / Supply of computer equip Institutional Strengthenin Request for Quo Single Stage - On 2022-08-2 2022-10-1 2022-09-1 2022-11-2 2022-10-1 IDA / 60880 Post Open - National 9,814.29 Signed ment for 14 municipal wat g tations e Envelope 0 5 7 9 5 er unit (MWU) system in C hui, Issyk Kul and Osh obla sts. IDA-SRWSSDP-G-2021-1-R Single Stage - On 2023-03-2 2023-04-0 2023-03-2 2023-05-1 2023-05-1 2023-06-0 2023-07-1 2023-07-1 2023-08-0 2024-01-1 2023-11-1 T-3 / Supply of laboratory IDA / 59070 Sanitation Development Post Request for Bids Open - National 0.00 Completed e Envelope 4 6 9 0 2 9 1 4 9 0 3 equipment for 11 rayons IDA-SRWSSDP-G-2023-1 / Institutional Strengthenin Request for Quo Single Stage - On 2023-05-3 2023-07-2 2023-06-2 2023-08-2 2023-07-1 IDA / D1380 Post Open - National 0.00 Completed Computer equipment for g tations e Envelope 0 5 7 4 8 WMU IDA-SRWSSDP-G-2023-3 / Institutional Strengthenin Request for Quo Single Stage - On 2023-06-1 2023-08-1 2023-08-1 2023-11-0 2023-09-2 Purchase of goods for CD IDA / 59070 Post Open - National 0.00 Completed g tations e Envelope 4 0 6 8 5 WUUs for 15 sub-projects IDA-SRWSSDP-G-2023-4 / Procurement of a wheeled Institutional Strengthenin Request for Quo Single Stage - On 2023-10-1 2023-12-0 2024-02-0 IDA / 60880 Post Open - National 0.00 Canceled excavator for the Achyk-Su g tations e Envelope 5 3 1 u and Kabyk sub-projects IDA-SRWSSDP-G-2023-4/R T1 / Procurement of a whe Institutional Strengthenin Request for Quo Single Stage - On 2023-12-0 2024-01-2 2024-02-2 2024-03-2 2024-04-0 IDA / 60880 Post Open - National 0.00 Completed eled excavator for the Ach g tations e Envelope 2 1 7 1 9 yk-Suu and Kabyk sub-proj ects IDA-SRWSSDP-AF2-G-RFB- Pending Im Institutional Strengthenin Single Stage - On 2024-01-1 2024-01-1 2024-04-0 2024-06-0 2024-06-1 2024-08-1 2023-1 / Procurement of s IDA / 74700 Post Request for Bids Open - National 0.00 plementati g e Envelope 0 1 3 2 7 6 pecial equipment for MPVs on IDA-SRWSSDP-AF-RFB-G-2 Institutional Strengthenin Single Stage - On 2024-06-1 2024-06-1 2024-07-1 2024-08-1 2024-09-2 2024-11-2 024-2 / Procurement of lab IDA / 60880 Post Request for Bids Open - National 0.00 Canceled g e Envelope 3 4 2 1 3 2 equipment for Kyrgyz Stat e Technical University IDA-SRWSSDP-AF-RFQ-G-2 Institutional Strengthenin Request for Quo Single Stage - On 2024-06-1 2024-08-0 2024-08-2 2024-09-2 024-1 / Procurement of offi IDA / D1380 Post Open - National 0.00 Signed g tations e Envelope 4 7 2 1 ce equipment for Kyrgyz S tate Technical University Page 3 IDA-SRWSSDP-AF-RFB-G-2 024-2/RT1 / Procurement o Institutional Strengthenin Single Stage - On 2024-07-2 2024-07-3 2024-09-1 2024-10-1 2024-11-1 2025-01-1 IDA / 60880 Post Request for Bids Open - National 0.00 Canceled f lab equipment for Kyrgy g e Envelope 6 1 1 1 5 4 z State Technical Universit y IDA-SRWSSDP-AF-RFQ-G-2 024-1-L2/RT1 / Procureme Institutional Strengthenin Request for Quo Single Stage - On 2024-07-2 2024-09-0 2024-09-1 2024-10-1 2024-09-2 IDA / D1380 Post Open - National 0.00 Completed nt of office equipment for g tations e Envelope 5 3 9 8 5 Kyrgyz State Technical Uni versity #Lot2 IDA-SRWSSDP-AF-RFB-G-2 024-2/RT2 / Procurement o Institutional Strengthenin Single Stage - On 2024-09-2 2024-09-2 2024-11-0 2024-12-0 2025-01-0 2025-04-0 IDA / 60880 Post Request for Bids Open - National 0.00 Canceled f lab equipment for Kyrgyz g e Envelope 2 4 5 5 9 9 State Technical University IDA-SRWSSDP-AF-RFB-G-2 Pending Im 024-2/RT3 / Procurement o Institutional Strengthenin Single Stage - On 2024-12-2 2024-12-2 2025-02-0 2025-03-1 2025-04-1 2025-10-1 IDA / 60880 Post Request for Bids Open - National 0.00 plementati f lab equipment for Kyrgy g e Envelope 4 9 9 1 5 2 on z State Technical Universit y NON CONSULTING SERVICES Activity Reference No. Bid Evaluation Repo Loan / Credit Market Approa Procurement Pr Prequalificatio Actual Amou Process S Draft Pre-qualificatio Prequalification Eval Draft Bidding Docu Specific Procuremen Bidding Documents Proposal Submission / Description Component Review Type Method rt and Recommenda Signed Contract Contract Completion No. ch ocess n (Y/N) nt (US$) tatus n Documents uation Report ment / Justification t Notice / Invitation as Issued / Opening / Minutes tion for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. Short List and Draft Combined Evaluatio Loan / Credit Market Approa Contract Type Actual Amoun Process Statu Expression of Intere Request for Proposa Opening of Technica Evaluation of Techn / Description Component Review Type Method Terms of Reference Request for Proposa n Report and Draft Signed Contract Contract Completion No. ch t (US$) s st Notice ls as Issued l Proposals / Minutes ical Proposal ls Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RWSSP3-PPG-CQ-2016-1 / Consultant Qual Consultants for Detailed D Open - Internatio 2016-04-1 2016-04-2 TF / A1605 Water Supply Investments Prior ification Selecti 125,290.67 Signed esign of Village Water Sup nal 5 4 on ply Infrastructure in Chui a nd Osh Oblasts SRWSSDP-QCBS-2016-2 / Quality And Cos Open - Internatio 2016-12-0 2016-12-0 2016-12-2 2017-02-1 2017-03-2 2017-03-1 2017-05-0 2017-04-1 2017-05-1 2017-05-1 2017-05-2 2017-06-1 2017-06-0 2018-06-1 2018-04-1 Preparation of detailed des IDA / 59070 Water Supply Investments Post t-Based Selectio 161,171.72 Completed nal 8 5 9 1 8 1 3 0 2 5 5 9 4 9 5 igns for WSS sub-projects i n n Chui oblast SRWSSDP-CQ-2017-3 / Ba Consultant Qual 2017-01-0 2017-02-2 2017-01-2 2017-03-0 2017-04-2 2017-04-0 2017-05-3 2017-05-1 2017-06-0 2017-11-0 2017-12-2 IDA / D1380 Project Management Post Open - National 34,049.99 Completed seline Survey ification Selecti 3 1 4 9 0 8 1 3 5 9 7 on SRWSSDP-QCBS-2016-1 / Quality And Cos Open - Internatio 2016-12-0 2016-12-2 2017-02-1 2017-03-1 2017-04-1 2017-05-1 2017-06-1 2018-06-1 Preparation of detailed des IDA / 59070 Water Supply Investments Post t-Based Selectio 0.00 Canceled nal 8 9 1 1 0 5 9 9 igns for WSS sub-projects i n n Osh oblast SRWSSDP-CQ-2017-4 / Pr Consultant Qual 2017-08-1 2017-08-2 2017-09-0 2017-08-2 2017-10-2 2017-10-1 2017-11-1 2017-12-0 2017-12-2 2017-12-2 2018-06-2 2019-09-1 eparation of detailed desig IDA / D1380 Water Supply Investments Post ification Selecti Open - National 184,576.00 Completed 6 2 6 2 0 7 9 1 4 2 2 4 ns for WSS sub-projects in on Osh oblast ARIS-AUDIT-LCS-2017-1 / Least Cost Selec Open - Internatio 2017-10-1 2017-10-0 2017-11-0 2018-03-1 2017-12-2 2018-03-2 2018-01-1 2018-04-1 2018-02-1 2018-04-1 2018-03-2 2018-04-2 2018-04-2 2018-04-2 2018-10-2 2022-06-3 IDA / D1380 Project Management Post 53,521.44 Signed Audit of project funds tion nal 7 9 7 2 1 8 8 8 7 8 4 3 8 6 5 0 IDA-SRWSSDP-CQ-2017-8 Consultant Qual / Preparation of designs an 2018-01-1 2017-11-0 2018-01-3 2018-03-1 2018-01-0 2018-04-1 2018-04-2 2018-05-2 2018-05-1 2018-11-1 2021-01-1 IDA / 59070 Sanitation Development Post ification Selecti Open - National 26,005.01 Completed d author supervision of su 0 3 1 6 8 5 4 0 2 6 8 on b-projects for out side toile ts IDA-SRWSSDP-CQ-2017-6 Consultant Qual / Creative Agency 2017-10-0 2017-09-2 2017-10-2 2017-12-0 2017-11-1 2018-01-0 2017-12-1 2018-02-0 2018-01-0 2018-08-0 2019-06-1 IDA / 59070 Sanitation Development Post ification Selecti Open - National 139,285.00 Completed Development of a Sector- 2 5 3 6 3 5 5 9 6 8 5 on Wide WASH communicatio n campaign IDA-SRWSSDP-CQ-2018-9 / Consultant for design and Consultant Qual Institutional Strengthenin 2018-01-3 2018-02-2 2018-04-0 2018-05-0 2018-06-0 2018-12-0 development of Managem IDA / 59070 Post ification Selecti Open - National 0.00 Canceled g 0 0 5 5 9 6 ent Information System for on improvement of sector per formance monitoring syste m IDA-SRWSSDP-CQ-AF-201 Consultant Qual 2018-10-0 2019-02-2 2018-10-2 2019-03-2 2018-12-0 2019-05-2 2019-01-0 2019-07-0 2019-02-1 2019-08-1 IDA / D1380 Project Management Post Open - National 0.00 Canceled 8-1 / Baseline Survey ification Selecti 5 7 6 3 9 2 8 1 2 1 on IDA-AF-SRWSSDP-QCBS-2 019-1 / Selection of Consul Quality And Cos Open - Internatio 2019-02-1 2019-02-1 2019-03-0 2019-02-1 2019-04-1 2019-05-2 2019-05-1 2019-06-2 2019-06-1 2019-07-0 2019-07-1 2019-07-2 2019-08-2 2019-08-1 2020-08-2 2021-01-1 tant for Detailed Design of IDA / D2040 Water Supply Investments Post t-Based Selectio 150,612.74 Completed nal 1 3 4 3 7 4 5 5 4 4 9 6 3 9 2 6 Village Water Supply Infras n tructure in Chui Oblast (6 s ub-projects)-1 package IDA-AF-SRWSSDP-QCBS-2 018-1 / Selection of Consul Quality And Cos tant for Detailed Design of Open - Internatio 2018-06-0 2018-07-0 2018-06-2 2018-08-1 2018-09-0 2018-10-0 2018-11-1 2018-12-1 2019-12-1 IDA / D2040 Water Supply Investments Post t-Based Selectio 0.00 Canceled Village Water Supply Infras nal 7 5 8 1 8 8 2 7 7 n tructure in Osh, Chui and I ssyk-Kul Oblasts (10 subpr ojects) -1 package IDA-AF-SRWSSDP-QCBS-2 018-2 / Selection of Consul Quality And Cos tant for Detailed Design of Open - Internatio 2018-06-1 2018-07-0 2018-07-0 2018-08-1 2018-09-1 2018-10-1 2018-11-1 2018-12-2 2019-12-2 IDA / D2040 Water Supply Investments Post t-Based Selectio 0.00 Canceled Village Water Supply Infras nal 0 5 1 4 1 1 5 0 0 n tructure in Osh, Chui and I ssyk-Kul Oblasts (10 sub-p rojects)-2 package IDA-SRWSSDP-CQ-2017-5 Consultant Qual / Revisions to Interpersona 2017-10-0 2017-10-2 2017-12-0 2018-01-0 2018-02-0 2018-08-0 IDA / 59070 Sanitation Development Post ification Selecti Open - National 0.00 Canceled l Communication Package 2 3 6 5 9 8 on and School WASH material s IDA-SRWSSDP-CQS-2017- Consultant Qual 5 / Revisions to Interperso 2017-02-1 2017-09-2 2017-03-0 2017-04-1 2017-11-1 2017-05-1 2017-12-1 2017-06-2 2018-01-0 2017-12-1 2019-08-1 IDA / 59070 Sanitation Development Post ification Selecti Open - National 53,299.24 Completed nal Communication Packa 0 5 3 6 3 6 8 0 2 7 2 on ge and School WASH mate rials IDA-SRWSSDP-QCBS-2019 -1 / Consulting Firm to assi st in review of Design and Quality And Cos Open - Internatio 2019-07-2 2019-08-0 2019-08-2 2019-08-2 2019-10-0 2020-03-0 2019-11-0 2020-05-2 2019-12-0 2021-10-2 2020-01-0 2020-02-1 2021-12-3 Estimate Documents and T IDA / D1380 Water Supply Investments Prior t-Based Selectio 0.00 Canceled nal 5 2 2 6 3 4 7 7 5 4 2 0 1 echnical Supervision of civi n l works for water supply sy stems rehabilitation in sub projects of Chui, Osh and I ssyk-Kul Oblasts IDA-SRWSSDP-AF-QCBS-2 019-2 / Consultant for Prep Quality And Cos aration of Feasibility Study Open - Internatio 2019-03-0 2019-03-1 2019-03-2 2019-04-0 2019-05-1 2019-06-0 2019-07-0 2019-08-1 2019-09-1 2020-09-1 IDA / 59070 Water Supply Investments Prior t-Based Selectio 0.00 Canceled and Preliminary Designs fo nal 8 4 9 5 2 9 9 3 7 6 n r Water Supply Systems in 31 Sub-projects in Chui, Os h and Issyk-Kul Oblasts IDA-SRWSSDP-CQ-2017-7 / Consultant for updating a Consultant Qual Institutional Strengthenin 2017-11-3 2017-10-1 2017-12-2 2018-02-0 2017-12-1 2018-03-0 2018-01-2 2018-04-0 2018-02-2 2018-10-0 2019-04-1 nd extending of training m IDA / 59070 Post ification Selecti Open - National 34,009.44 Completed g 0 7 1 3 3 5 9 9 6 6 2 odules for training of Aiyl on Okmotu/CDWUU and other operators IDA-SRWSSDP-QCBS-FS-2 020-1 / Preparation of Feas Quality And Cos ibility Study and Preliminar Open - Internatio 2020-03-2 2020-03-2 2020-04-1 2020-04-1 2020-05-1 2020-06-1 2020-06-1 2020-09-1 2020-07-1 2020-10-3 2020-08-1 2020-11-1 2020-09-1 2021-02-1 2021-03-3 2022-05-0 IDA / 59070 Water Supply Investments Post t-Based Selectio 0.00 Completed y Designs for Water Suppl nal 0 0 0 3 5 2 4 8 4 0 1 3 5 5 0 2 n y Systems in the regions o f Otuz-Adyr and Gulbaar vi llages, Osh oblast IDA-AF-SRWSSDP-QCBS-2 019-2 / Selection of Consul Quality And Cos Open - Internatio 2019-09-0 2019-10-2 2019-09-2 2019-11-0 2019-12-1 2019-12-0 2020-01-1 2020-01-0 2020-01-1 2020-02-0 2020-01-2 2020-03-1 2020-02-1 2021-03-1 tant for Detailed Design of IDA / 59070 Water Supply Investments Post t-Based Selectio 118,506.99 Signed nal 2 4 3 6 9 4 0 3 7 7 9 3 5 3 Village Water Supply Infras n tructure in Chui Oblast-2 p ackage IDA-SRWSSDP-CQS-COMP 2-2020-1 / Company on pr Consultant Qual oducing of social informati 2020-06-0 2020-06-1 2020-06-2 2020-08-1 2020-09-1 2020-10-1 2021-04-1 IDA / D1380 Sanitation Development Post ification Selecti Open - National 0.00 Canceled onal and educational video 8 5 9 2 1 6 4 on clips on prevention the spr ead of COVID-19 virus in t he Kyrgyz Republic IDA-SRWSSDP-CQS-COMP 2-2020-2 / Company on pr oducing a video training o Consultant Qual 2020-06-0 2020-06-1 2020-06-2 2020-08-1 2020-09-1 2020-10-1 2021-04-1 n preventing the spread of IDA / D1380 Sanitation Development Post ification Selecti Open - National 0.00 Canceled 8 5 9 2 1 6 4 COVID-19 virus for a wide on range of people working wi th the population after qua rantine (for field activists) IDA-SRWSSDP-CQS-COMP Consultant Qual 3-2020-2 / Сompany for su Institutional Strengthenin 2020-06-1 2020-08-0 2020-07-0 2020-08-2 2021-03-1 2020-09-2 2021-05-3 2020-10-2 2021-06-0 2021-05-2 2022-05-3 IDA / D1380 Post ification Selecti Open - National 73,634.03 Completed pporting to Institutional De g 8 5 9 2 1 1 1 6 1 4 1 on velopment Plan for the DD WSWD IDA-SRWSSDP-CQS-COMP 3-2020-3 / Company for th Consultant Qual e Supporting to Water Sup Institutional Strengthenin 2020-06-1 2020-09-0 2020-07-0 2020-08-2 2020-12-0 2020-09-2 2021-06-1 2020-10-2 2021-06-2 2021-07-2 2022-06-3 IDA / D1380 Post ification Selecti Open - National 190,872.51 Completed ply and Sanitation Sector P g 8 3 9 2 4 1 8 6 5 3 0 on rofessional and Vocational Development Program in t he Kyrgyz Republic IDA-SRWSSDP-CQS-COMP 3-2020-1 / Company for th Consultant Qual Institutional Strengthenin 2020-06-1 2020-09-0 2020-07-0 2020-08-2 2020-12-0 2020-09-2 2021-01-1 2020-10-2 2021-02-1 2021-04-2 e development of Legal R IDA / D1380 Post ification Selecti Open - National 35,780.01 Signed g 8 3 9 2 4 1 8 6 7 4 egulatory Acts for Water S on upply and Wastewater Dis posal Sector IDA-SRWSSDP-CQS-COMP 2-2020-3 / Company for Pr Consultant Qual 2020-07-1 2020-07-2 2020-07-3 2020-09-1 2020-09-1 2020-10-1 2020-09-1 2020-11-1 2020-10-1 2021-11-1 2020-12-0 oduction Social and Educat IDA / D1380 Sanitation Development Post ification Selecti Open - National 15,326.40 Completed 0 0 1 3 4 3 8 7 3 7 1 ional Videos on prevention on of COVID-19 spread in the Kyrgyz Republic IDA-SRWSSDP-AF-CQS-20 Consultant Qual 19-4 / Preparation of detail Under Impleme 2019-09-2 2019-05-2 2019-10-1 2019-11-2 2019-08-2 2019-12-2 2019-09-2 2020-02-0 2021-02-0 IDA / 60880 Water Supply Investments Post ification Selecti Open - National 0.00 ed designs for WSS sub-pr ntation 5 8 6 9 7 9 5 2 1 on ojects in Osh oblast (1 pha se) IDA-SRWSSDP-AF-QCBS-D Quality And Cos DE-2020-1 / Preparation of 2020-06-3 2020-01-1 2020-07-2 2020-09-0 2020-03-0 2020-10-0 2020-05-1 2020-10-3 2020-06-0 2020-12-0 2020-06-1 2021-01-0 2020-06-3 2022-01-0 2022-12-3 IDA / 60880 Water Supply Investments Post t-Based Selectio Open - National 0.00 Completed detailed designs for WSS s 0 5 1 3 5 1 4 1 5 5 2 9 0 9 1 n ub-projects in Osh oblast ( 2 Phase) IDA-AF-SRWSSDP-QCBS-2 Quality And Cos 020-3 / Preparation of deta 2020-03-0 2020-03-2 2020-05-0 2020-06-0 2020-07-0 2020-08-0 2020-09-1 2021-09-1 IDA / 60880 Water Supply Investments Post t-Based Selectio Open - National 0.00 Canceled iled designs for WSS sub-p 1 2 5 2 2 6 0 0 n rojects in Chui oblast (3 Ph ase) IDA-SRWSSDP-AF-CQS-20 Consultant Qual 19-3 / Preparation of detail Under Impleme 2019-10-0 2019-06-2 2019-10-2 2019-12-0 2019-08-2 2020-01-0 2019-09-2 2020-02-1 2020-08-0 IDA / 60880 Water Supply Investments Post ification Selecti Open - National 0.00 ed designs for WSS sub-pr ntation 3 0 4 7 7 6 5 0 8 on ojects in IK oblast (1 Phase ) IDA-SRWSSDP-AF-QCBS-D Quality And Cos DE-2020-2 / Preparation of 2020-03-0 2020-03-1 2020-03-2 2020-05-0 2020-07-3 2020-06-0 2020-09-0 2020-07-0 2020-10-3 2020-08-0 2020-11-1 2020-09-1 2020-12-0 2021-09-1 2022-07-2 IDA / 60880 Water Supply Investments Post t-Based Selectio Open - National 127,488.68 Completed detailed designs for WSS s 1 6 2 5 0 2 2 2 0 6 7 0 1 0 9 n ub-projects in IK oblast (2 Phase) IDA-SRWSSDP-AF-CQS-19- Consultant Qual 2019-02-2 2019-02-2 2019-03-2 2019-05-0 2019-05-2 2019-06-0 2019-07-0 2019-07-0 2019-07-0 2020-01-0 2020-02-0 1 / Baseline Survey and Im IDA / 60880 Project Management Post ification Selecti Open - National 35,671.67 Completed 7 7 0 3 2 2 1 7 5 3 5 pact Assesment on IDA-SRWSSDP-AF-CQS-20 Consultant Qual 21-1 / Technical Supervisio 2021-04-2 2021-06-0 2021-05-2 2021-06-1 2021-07-0 2022-05-1 2021-07-2 2022-08-1 2021-08-0 2022-09-0 2023-08-0 IDA / D1380 Water Supply Investments Post ification Selecti Open - National 98,658.58 Signed n of Civil Works for Constr 6 4 4 1 5 6 6 9 9 4 9 on uction of Rural Water Supp ly and Sanitation Systems ARIS-AUDIT-LCS-2021-1 / Least Cost Selec Open - Internatio Under Impleme 2021-08-0 2021-08-1 2021-08-2 2021-09-2 2021-09-1 2021-10-0 2021-10-1 2021-11-0 2021-11-2 2023-12-3 IDA / 60880 Project Management Post 0.00 Audit tion nal ntation 6 6 0 4 7 8 5 5 6 1 IDA-SRWSSDP-AF-CQS-EIA -2021 / Consulting compan Consultant Qual y for Engineering, Environ 2021-05-0 2021-05-0 2021-05-2 2021-06-1 2021-06-2 2021-10-0 2021-07-0 2021-07-1 2021-09-2 IDA / D2040 Water Supply Investments Post ification Selecti Open - National 0.00 Canceled mental and Sanitary Safet 7 7 8 1 5 8 2 6 4 on y Review in subprojects Iv anovka Station, Kara-Jygac h, Sosnovka, Komsomol’sk oe and Kurmontu IDA-SRWSSDP-CQS-2022- Consultant Qual 2022-08-1 2022-08-1 2022-09-0 2022-10-1 2022-10-0 2022-11-1 2022-11-1 2022-12-2 2022-11-2 2023-06-2 1 / Preparation of detailed IDA / D1380 Water Supply Investments Post ification Selecti Open - National 0.00 Signed 5 1 5 9 4 8 5 3 1 1 designs for Otuz-Adyr WSS on sub-project IDA-SRWSSDP-CQS-2022- Consultant Qual 2022-08-1 2022-08-1 2022-09-0 2022-10-1 2022-10-0 2022-11-1 2022-11-1 2022-12-2 2022-11-2 2023-06-2 2 / Preparation of detailed IDA / D1380 Water Supply Investments Post ification Selecti Open - National 0.00 Signed 5 1 5 9 4 8 5 3 1 1 designs for Gulbar WSS su on b-project IDA-SRWSSDP-AF-CQS-20 22-11 / Development of So Consultant Qual cial Video Tutorials on Rul 2023-01-1 2023-03-1 2023-01-3 2023-03-1 2023-04-1 2023-05-2 2023-06-1 IDA / D2040 Sanitation Development Post ification Selecti Open - National 0.00 Canceled es for Construction of Outd 0 3 1 6 5 0 9 on oor Latrines With Improve d Ventilation and Septic Ta nks at Rural Households IDA-SRWSSDP-AF2-CS-CQ S-2023-1 / Preparation of d Consultant Qual etailed desings for improv 2024-01-0 2024-04-1 2024-01-1 2024-03-0 2024-07-1 2024-03-0 2024-09-2 2024-04-0 2024-09-2 2024-07-0 IDA / 74700 Sanitation Development Post ification Selecti Open - National 0.00 Signed ement of sewerage dispos 3 6 7 1 9 6 3 4 7 3 on al systems for milti-storey apartment buldings in sub projects Kurmontu and Ak- Bulak Issyk-Kul oblast Page 4 IDA-SRWSSDP-AF-CQS-20 Consultant Qual 24-1 / Consulting services Under Impleme 2024-06-1 2024-09-0 2024-06-1 2024-07-1 2024-10-2 2024-07-3 2025-01-2 2024-08-1 2026-05-0 IDA / D1380 Water Supply Investments Post ification Selecti Open - National 0.00 for technical supervision of ntation 3 3 8 7 5 1 7 5 5 on water supply rehabilitation in Otuz-Adyr IDA-SRWSSDP-AF-CQS-20 Consultant Qual 24-2 / Consulting services Under Impleme 2024-06-1 2024-08-0 2024-06-1 2024-07-1 2024-10-2 2024-07-3 2024-11-2 2024-08-1 2026-02-2 IDA / D1380 Water Supply Investments Post ification Selecti Open - National 0.00 for technical supervision of ntation 3 8 8 7 5 1 5 5 0 on water supply rehabilitation in Gulbaar INDIVIDUAL CONSULTANTS Activity Reference No. Loan / Credit Market Approa Actual Amoun Process Statu Invitation to Identifi Draft Negotiated Co Component Review Type Method Contract Type Teams of Reference Signed Contract Contract Completion / Description No. ch t (US$) s ed/Selected Consult ntract Planned Actual Planned ant Actual Planned Actual Planned Actual Planned Actual RWSSP3-PPG-IC-2016-1 / Selection of Consultant for Individual Cons 2016-09-1 2016-09-1 TF / A1605 Water Supply Investments Prior Open 17,052.22 Signed Review of Detailed Design ultant Selection 5 9 s for Water Supply Infrastr ucture IDA-SRWSSDP-IC-2017-2 / Institutional Strengthenin 2016-12-0 2016-12-0 2016-12-0 2016-12-2 2016-12-3 2016-12-2 2017-06-2 IDA / D1380 Post Direct Selection Direct 17,028.70 Terminated Institutional specialist g 9 1 9 6 0 6 8 IDA-SRWSSDP-IC-2017-3 / 2016-12-0 2016-12-0 2016-12-0 2016-12-2 2016-12-3 2016-12-2 2017-06-2 2017-12-3 IDA / 59070 Water Supply Investments Post Direct Selection Direct 12,392.86 Completed Infrastructure engineer (1 9 1 9 6 0 6 8 1 position) IDA-SRWSSDP-IC-2017-1 / 2016-12-0 2016-12-1 2016-12-0 2016-12-2 2016-12-3 2017-01-1 2017-06-2 2017-11-2 IDA / D1380 Sanitation Development Post Direct Selection Direct 60,000.00 Completed Sanitation and hygene spe 9 9 9 1 0 1 8 9 cialist SRWSSDP-CS-SSS-2017-1 / Preparation of detailed d 2017-04-0 2017-06-0 2017-04-0 2017-06-2 2017-04-2 2017-09-1 2017-10-2 2018-11-3 IDA / 59070 Water Supply Investments Post Direct Selection Direct 0.00 Completed esigns for WSS sub-project 3 5 3 1 4 2 1 0 s in Issyk-Kul oblast (Chelp ek, Darkhan) IDA-SRWSSDP-IC-2017-6 / Institutional Strengthenin Individual Cons 2017-04-1 2017-03-3 2017-04-1 2017-05-2 2017-04-1 2017-05-2 2017-05-0 2017-10-2 Social mobilisation on insti IDA / D1380 Post Open 0.00 Canceled g ultant Selection 1 0 1 5 1 5 2 9 tutional strengthening IDA-SRWSSDP-2017-7 / So Institutional Strengthenin Individual Cons 2017-04-1 2017-04-0 2017-04-1 2017-05-2 2017-04-1 2017-05-2 2017-05-0 2017-06-0 2017-10-2 2020-01-0 cial mobilisation expert o IDA / D1380 Post Open 13,784.43 Completed g ultant Selection 1 3 1 2 1 9 2 7 9 7 n institutional strengthenin g IDA-SRWSSDP-IC-2017-5 / Institutional Strengthenin Individual Cons 2017-04-1 2017-04-0 2017-05-3 2017-05-2 2017-06-2 2017-05-2 2017-07-2 2018-01-2 Local experts on social mo IDA / D1380 Post Open 0.00 Canceled g ultant Selection 1 3 0 2 0 9 5 1 bilization and institutional development IDA-SRWSSDP-IC-2017-8 / Institutional Strengthenin Individual Cons 2017-04-1 2017-04-0 2017-04-1 2017-05-2 2017-04-1 2017-05-2 2017-05-0 2017-06-0 2017-10-2 2020-01-0 Local social mobilisation e IDA / D1380 Post Open 17,190.99 Completed g ultant Selection 1 3 1 2 1 9 2 7 9 7 xpert on institutional stren gthening IDA-RWSSDP-CS-IC-2017- Individual Cons 2017-05-1 2019-04-1 2017-07-0 2017-06-1 2017-07-2 2017-06-1 2017-09-0 2017-06-1 2018-02-2 2018-06-3 3 / Field technical supervis IDA / 59070 Water Supply Investments Post Open 0.00 Completed ultant Selection 9 0 7 9 8 9 1 9 8 0 ion engineer in Togotoi IDA-SRWSSDP-CS-IC-2017 Individual Cons 2017-05-1 2017-05-1 2017-07-0 2017-07-2 2017-09-0 2018-02-2 -8 / Field technical supervi IDA / 59070 Water Supply Investments Post Open 0.00 Canceled ultant Selection 9 9 7 8 1 8 sion engineer Kurama IDA-SRWSSDP-CS-IC-2017 Individual Cons 2017-05-1 2017-07-0 2017-07-2 2017-09-0 2018-02-2 IDA / 59070 Water Supply Investments Post Open 0.00 Canceled -9 / Assistant of field engin ultant Selection 9 7 8 1 8 eer in Togotoi IDA-SRWSSDP-CS-IC-2017 Individual Cons 2017-05-1 2017-07-0 2017-07-2 2017-09-0 2018-02-2 IDA / 59070 Water Supply Investments Post Open 0.00 Canceled -10 / Assistant of field engi ultant Selection 9 7 8 1 8 neer in Sultan IDA-SRWSSDP-2017-11 / A Individual Cons 2017-05-1 2018-08-0 2017-07-0 2018-09-0 2017-07-2 2018-09-0 2017-09-0 2018-09-1 2018-02-2 2019-05-1 IDA / 59070 Water Supply Investments Post Open 3,932.44 Completed ssistant of field engineer in ultant Selection 9 1 7 6 8 6 1 9 8 2 Kyrgyz Ata IDA-SRWSSDP-CS-IC-2017 Individual Cons 2017-05-1 2017-07-0 2017-07-2 2017-09-0 2018-02-2 -12 / Assistant of field engi IDA / 59070 Water Supply Investments Post Open 0.00 Canceled ultant Selection 9 7 8 1 8 neer in Kurama SRWSSDP-DS-2017-1 / Pre paration of detailed design 2017-06-1 2017-06-0 2017-06-2 2017-06-2 2017-09-0 2017-09-1 2018-03-0 2018-12-0 IDA / 59070 Water Supply Investments Post Direct Selection Direct 53,560.16 Completed s for WSS sub-projects in I 9 2 9 1 2 8 1 7 K oblast: Chelpek, Darkhan IDA-SRWSSDP-IC-2017-9 / Institutional Strengthenin Individual Cons 2017-06-0 2017-07-2 2017-08-1 2017-09-2 2018-03-2 IDA / 59070 Prior Open 0.00 Canceled International contract supe g ultant Selection 8 7 7 1 0 rvision IDA-SRWSSDP-IC-2017-11 Individual Cons 2017-08-1 2017-08-2 2017-10-0 2017-12-0 2017-10-2 2018-01-1 2017-11-2 2017-12-2 2018-05-2 2019-02-0 IDA / D1380 Water Supply Investments Prior Open 0.00 Completed / International contract su ultant Selection 6 3 4 4 5 9 9 0 8 1 pervision IDA-SRWSSDP-IC-2017-12 Individual Cons 2017-08-1 2017-07-1 2017-10-1 2016-09-2 2017-11-0 2017-10-3 2017-12-0 2017-11-1 2018-06-0 2018-10-1 / Consultant for review th IDA / 59070 Water Supply Investments Post Open 50,000.00 Completed ultant Selection 6 2 3 6 3 0 8 7 6 5 e designs for sub-projects IDA-SRWSSDP-IC-2017-13 Institutional Strengthenin Individual Cons 2017-08-2 2017-10-1 2017-10-3 2017-12-0 2018-06-0 IDA / 59070 Post Open 0.00 Canceled / Hydrogeologist g ultant Selection 2 0 1 5 3 IDA-SRWSSDP-CW-2017-5 Individual Cons 2017-05-1 2017-07-0 2017-07-2 2017-09-0 2018-02-2 / Field technical supervisio IDA / 59070 Water Supply Investments Post Open 0.00 Canceled ultant Selection 9 7 8 1 8 n engineer in Sultan IDA-SRWSSDP-IC-2017-4 / Individual Cons 2016-12-0 2016-12-0 2017-01-2 2016-12-2 2017-02-1 2016-12-2 2017-03-2 2017-01-1 2017-09-2 2018-07-1 IDA / 59070 Water Supply Investments Post Open 8,577.56 Completed Infrastructure engineer 2 ultant Selection 9 5 7 9 7 9 4 8 0 5 IDA-SRWSSDP-SSS-17-5 / 2017-06-0 2017-07-2 2017-06-1 2017-06-1 2017-08-1 2017-06-3 2018-02-1 2019-10-1 IDA / 59070 Water Supply Investments Post Direct Selection Direct 20,711.54 Completed Author supervision 1 6 1 3 5 0 1 5 IDA-SRWSSDP-IC-2017-29 Institutional Strengthenin Individual Cons 2017-10-1 2017-03-3 2017-12-0 2017-10-1 2017-12-2 2017-10-1 2018-01-2 2017-10-2 2018-07-2 2020-01-1 / Social mobilisation on ins IDA / 59070 Post Open 15,648.99 Completed g ultant Selection 3 1 1 3 2 3 6 2 5 2 titutional strengthening IDA-SRWSSDP-IC-2017-30 Institutional Strengthenin Individual Cons 2017-10-1 2018-03-3 2017-12-0 2017-10-1 2017-12-2 2017-10-1 2018-01-2 2017-10-2 2018-07-2 2018-07-0 / Social mobilisation on ins IDA / 59070 Post Open 6,015.04 Completed g ultant Selection 3 0 1 3 2 3 6 2 5 9 titutional strengthening IDA-SRWSSDP-IC-2017-31 Institutional Strengthenin Individual Cons 2017-10-1 2017-10-3 2017-12-0 2017-10-1 2017-12-2 2017-10-1 2018-01-2 2017-10-2 2018-07-2 2020-01-1 / Social mobilisation on ins IDA / 59070 Post Open 13,892.03 Completed g ultant Selection 3 0 1 3 2 3 6 2 5 2 titutional strengthening IDA-SRWSSDP-IC-2017-32 Institutional Strengthenin Individual Cons 2017-10-1 2017-03-3 2017-12-0 2017-10-1 2017-12-2 2017-10-1 2018-01-2 2017-10-2 2018-07-2 2020-01-1 / Social mobilisation on ins IDA / 59070 Post Open 14,499.97 Completed g ultant Selection 3 0 1 3 2 3 6 2 5 2 titutional strengthening IDA-SRWSSDP-IC-2017-33 Individual Cons 2017-10-0 2017-05-1 2017-11-1 2017-09-2 2017-12-1 2017-09-2 2018-01-1 2017-09-3 2018-07-1 2019-04-0 / Junior field technical supe IDA / 59070 Water Supply Investments Post Open 6,015.04 Completed ultant Selection 1 2 9 0 0 1 4 0 3 9 rvision engineer IDA-SRWSSDP-IC-2017-34 Individual Cons 2017-10-0 2017-05-1 2017-11-1 2017-09-2 2017-12-1 2017-09-2 2018-01-1 2017-09-3 2018-07-1 2018-07-0 / Junior field technical supe IDA / 59070 Water Supply Investments Post Open 6,015.04 Completed ultant Selection 1 2 9 0 0 1 4 0 3 9 rvision engineer IDA-SRWSSDP-IC-17-5 / So Institutional Strengthenin Individual Cons 2017-06-0 2017-03-3 2017-07-2 2017-05-2 2017-08-1 2017-05-2 2017-09-1 2017-06-1 2018-03-1 2018-07-0 cial mobilisation on institut IDA / 59070 Post Open 6,874.33 Completed g ultant Selection 1 0 0 5 0 5 4 0 3 9 ional strengthening IDA-SRWSSDP-IC-17-6 / So Institutional Strengthenin Individual Cons 2017-06-0 2017-07-2 2017-08-1 2017-09-1 2018-03-1 cial mobilisation on institut IDA / 59070 Post Open 0.00 Canceled g ultant Selection 1 0 0 4 3 ional strengthening IDA-SRWSSDP-IC-17-7 / So Institutional Strengthenin Individual Cons 2017-06-0 2017-03-3 2017-07-2 2017-05-2 2017-08-1 2017-05-2 2017-09-1 2017-06-0 2018-03-1 2019-12-3 cial mobilisation on institut IDA / 59070 Post Open 0.00 Completed g ultant Selection 1 1 0 5 0 5 4 1 3 1 ional strengthening IDA-SRWSSDP-IC-17-8 / So Institutional Strengthenin Individual Cons 2017-06-0 2017-03-3 2017-07-2 2017-05-2 2017-08-1 2017-05-2 2017-09-1 2018-03-1 cial mobilisation on institut IDA / 59070 Post Open 0.00 Canceled g ultant Selection 1 1 0 5 0 5 4 3 ional strengthening IDA-SRWSSDP-IC-17-9 / Fi Individual Cons 2017-06-1 2017-05-1 2017-08-0 2017-08-2 2017-10-0 2018-03-3 IDA / 59070 Water Supply Investments Post Open 0.00 Canceled eld technical supervision e ultant Selection 9 9 7 8 2 1 ngineer IDA-SRWSSDP-IC-17-10 / F Individual Cons 2017-07-1 2017-05-1 2017-09-0 2017-07-1 2017-09-2 2017-07-1 2017-10-3 2017-07-1 2018-04-2 2018-01-1 IDA / 59070 Water Supply Investments Post Open 0.00 Completed ield technical supervision ultant Selection 7 2 4 3 5 3 0 4 8 7 engineer IDA-SRWSSDP-IC-17-12 / Individual Cons 2017-08-2 2019-04-1 2017-10-1 2017-08-2 2017-11-0 2017-08-2 2017-12-0 2017-09-0 2018-06-0 2018-09-0 IDA / 59070 Water Supply Investments Post Open 15.57 Completed Hydrogeologist ultant Selection 4 1 2 3 2 4 7 2 5 9 IDA-SRWSSDP-IC-17-13 / F Individual Cons 2017-09-0 2017-05-1 2017-10-2 2017-08-2 2017-11-1 2017-09-0 2017-12-1 2017-09-0 2018-06-1 2019-05-3 IDA / 59070 Water Supply Investments Post Open 0.00 Completed ield technical supervision ultant Selection 4 2 3 9 3 4 8 4 6 1 engineer IDA-SRWSSDP-IC-17-14 / F Individual Cons 2017-08-2 2019-04-1 2017-10-1 2017-07-3 2017-11-0 2017-08-2 2017-12-0 2017-08-2 2018-06-0 2020-08-3 IDA / 59070 Water Supply Investments Post Open 0.00 Completed ield technical supervision ultant Selection 5 0 3 1 3 4 8 4 6 1 engineer IDA-SRWSSDP-IC-17-15 / F Individual Cons 2017-09-0 2019-04-1 2017-10-2 2017-07-3 2017-11-1 2017-09-0 2017-12-1 2017-09-1 2018-06-1 2018-02-2 IDA / 59070 Water Supply Investments Post Open 2,571.61 Completed ield technical supervision ultant Selection 4 0 3 1 3 4 8 3 6 7 engineer IDA-SRWSSDP-IC-17-36 / S Individual Cons 2017-11-1 2017-10-0 2018-01-0 2017-11-1 2018-01-2 2017-11-1 2018-02-2 2017-11-2 2018-08-2 2019-01-1 IDA / 59070 Sanitation Development Post Open 9,292.35 Completed anitation & Hygiene Specia ultant Selection 4 3 2 0 3 3 7 6 6 2 list IDA-SRWSSDP-IC-2017-37 Individual Cons 2017-12-0 2017-05-1 2018-01-1 2017-11-3 2018-02-0 2017-11-3 2018-03-1 2017-12-0 2018-09-1 2019-04-3 / Junior field technical supe IDA / 59070 Water Supply Investments Post Open 0.00 Completed ultant Selection 1 2 9 0 9 0 6 1 2 0 rvision engineer IDA-SRWSSDP-IC-2017-38 Individual Cons 2017-12-0 2017-12-0 2018-01-1 2018-02-0 2018-03-1 2018-09-1 / Junior field technical supe IDA / 59070 Water Supply Investments Post Open 0.00 Canceled ultant Selection 1 1 9 9 6 2 rvision engineer IDA-SRWSSDP-IC-2017-39 Individual Cons 2017-02-1 2018-11-0 2017-03-3 2017-12-2 2017-04-2 2017-12-2 2017-05-2 2018-01-1 2017-11-2 2018-08-0 / PR consultant for commu IDA / 59070 Sanitation Development Post Open 41,876.99 Completed ultant Selection 0 2 1 9 1 9 6 6 2 9 nication strategy IDA-SRWSSDP-IC-2017-44 / Local consultant for supp Institutional Strengthenin Individual Cons 2017-11-3 2018-01-1 2018-02-0 2018-03-1 2018-09-1 IDA / 59070 Post Open 0.00 Canceled orting CDWUU in financial g ultant Selection 0 8 8 5 1 planning and developmen t of tarifs IDA-SRWSSDP-IC-2017-45 Institutional Strengthenin Individual Cons 2017-11-3 2018-01-1 2018-02-0 2018-03-1 2018-09-1 IDA / 59070 Post Open 0.00 Canceled / Billing system consultant g ultant Selection 0 8 8 5 1 IDA-SRWSSDP-IC-2018-4 / Consultant for supporting of advanced financing of t Institutional Strengthenin Individual Cons 2018-11-0 2018-12-2 2019-01-1 2019-02-1 2019-08-1 he sector, including planni IDA / 59070 Post Open 0.00 Canceled g ultant Selection 1 0 0 4 3 ng of investments, financia l modelling, regulation, mo nitoring, survey of tarifs (i nternational consulatnt) IDA-SRWSSDP-IC-2018-5 / Consultant for developmen Institutional Strengthenin Individual Cons 2017-11-0 2017-12-2 2018-01-1 2018-02-1 2018-08-1 IDA / 59070 Post Open 0.00 Canceled t and piloting of new mod g ultant Selection 1 0 0 4 3 els of services manageme nt (international) IDA-SRWSSDP-IC-2018-6 / Consultant for developmen Institutional Strengthenin Individual Cons 2019-01-1 2019-03-0 2019-03-2 2019-04-3 2019-10-2 IDA / 59070 Post Open 0.00 Canceled t of institutional support pl g ultant Selection 5 5 6 0 7 an for DWSS (international ) IDA-SRWSSDP-IC-2018-36 Institutional Strengthenin Individual Cons 2017-12-0 2018-01-1 2018-02-0 2018-03-1 2018-09-1 / Consultant for developm IDA / 59070 Post Open 0.00 Canceled g ultant Selection 1 9 9 6 2 ent of legal acts in WSS sp here IDA-SRWSSDP-IC-2017-17 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-10-0 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,053.84 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 3 4 8 3 5 IDA-SRWSSDP-IC-2017-18 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,050.94 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-19 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,053.84 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-20 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,053.84 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-21 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,053.84 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-22 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,053.84 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-23 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,050.94 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-24 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,050.94 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-25 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,050.94 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 Page 5 IDA-SRWSSDP-IC-2017-26 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,050.94 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-27 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,050.94 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-28 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,050.94 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-35 Individual Cons 2017-11-0 2017-03-3 2017-12-2 2017-08-1 2018-01-1 2017-09-2 2018-02-1 2017-11-1 2018-08-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 4,417.04 Completed / Trеiner-facilitator ultant Selection 1 0 0 0 0 9 4 9 3 5 IDA-SRWSSDP-IC-2017-42 Institutional Strengthenin Individual Cons 2017-11-2 2018-01-1 2018-02-0 2018-03-1 2018-09-0 / Trainer for capacity build IDA / 59070 Post Open 0.00 Canceled g ultant Selection 8 6 6 3 9 ing of WSS sector institutio ns IDA-SRWSSDP-IC-2018-2 / Institutional Strengthenin Individual Cons 2018-01-1 2018-02-2 2018-03-2 2018-04-2 2018-10-2 GIS consultant and IT cons IDA / 59070 Post Open 0.00 Canceled g ultant Selection 0 8 1 5 2 ultant (1 person) IDA-SRWSSDP-DS-2018-1 2018-03-0 2018-02-1 2018-03-1 2018-03-2 2018-05-1 2018-05-0 2018-11-1 2018-11-3 / Preparation of detailed d IDA / 59070 Water Supply Investments Post Direct Selection Direct 19,990.19 Completed 1 4 1 2 5 2 1 0 esigns for WSS sub-project s in Oshoblast: Korul IDA-SRWSSDP-DS-2018-2 / Preparation of detailed d 2018-03-0 2018-02-1 2018-03-1 2018-03-2 2018-05-1 2018-05-1 2018-11-1 2018-11-1 esigns for WSS sub-project IDA / 59070 Water Supply Investments Post Direct Selection Direct 57,004.80 Completed 1 4 1 2 5 7 1 5 s in IK and Chui oblasts: Ta mga, Ichke-Bulun, Gornay a Maevka. IDA-SRWSSDP-DS-2018-3 2018-03-0 2018-02-1 2018-03-1 2018-03-2 2018-05-1 2018-05-0 2018-11-1 2019-08-3 / Preparation of detailed d IDA / 59070 Water Supply Investments Post Direct Selection Direct 13,624.20 Completed 1 4 1 2 5 2 1 0 esigns for WSS sub-project s in IK oblast: Ak-Bulak IDA-SRWSSDP-IC-2018-13 / Coordinator of a Team for Institutional Strengthenin Individual Cons 2018-04-2 2018-03-0 2018-06-0 2018-03-2 2018-06-2 2018-03-2 2018-07-3 2018-04-1 2019-12-3 2019-01-1 development and impleme IDA / D1380 Post Open 21,779.99 Completed g ultant Selection 5 2 5 9 6 9 1 7 1 9 ntation of Rural Water Sup ply and Sanitation Informa tion System (SIASAR) IDA-SRWSSDP-IC-2018-12 / Web Developer Specialist Institutional Strengthenin Individual Cons 2018-04-2 2018-03-0 2018-06-1 2018-04-1 2018-07-0 2018-04-2 2018-08-1 2018-05-0 2019-12-3 2019-01-1 IDA / D1380 Post Open 11,118.28 Completed Information System for Rur g ultant Selection 7 2 5 3 6 0 0 9 1 9 al Water Supply and Sanit ation (SIASAR) IDA-SRWSSDP-IC-2018-14 Institutional Strengthenin Individual Cons 2018-04-2 2018-03-0 2018-06-1 2018-03-2 2018-07-0 2018-04-2 2018-08-1 2018-04-2 2019-12-3 2018-12-3 / IT-System Specialist for R IDA / D1380 Post Open 0.00 Completed g ultant Selection 7 2 5 9 6 3 0 4 1 1 ural Water Supply and San itation (SIASAR) IDA-SRWSSDP-IC-2018-11 / Sector Monitoring Special Institutional Strengthenin Individual Cons 2018-04-2 2018-03-0 2018-06-1 2018-03-2 2018-07-0 2018-03-2 2018-08-0 2018-04-1 2019-12-3 2019-12-3 ist for development and im IDA / D1380 Post Open 21,522.85 Completed g ultant Selection 5 2 3 9 4 9 8 7 1 1 plementation of Informatio n System for Rural Water S upply and Sanitation (SIAS AR) IDA-SRWSSDP-IC-2017-40 / Consultant for rehabilitati Individual Cons 2017-12-0 2018-11-2 2018-01-2 2018-02-1 2018-03-2 2018-09-1 on of indoor sanitary facilit IDA / 59070 Sanitation Development Post Open 0.00 Canceled ultant Selection 6 8 4 4 1 7 ies in schools of Osh oblast with survey, preparation of BoQ and drawings IDA-SRWSSDP-IC-2017-41 / Consultant for rehabilitati Individual Cons 2017-12-0 2018-11-2 2018-01-2 2018-02-1 2018-03-2 2018-09-1 on of indoor sanitary facilit IDA / 59070 Sanitation Development Post Open 0.00 Canceled ultant Selection 6 8 4 4 1 7 ies in schools of Chuy obla st with survey, preparation of BoQ and drawings IDA-SRWSSDP-SSS-18-6 / 2019-02-1 2019-04-2 2019-02-2 2019-05-1 2019-04-2 2019-05-1 2019-10-2 2020-12-3 Author supervision of Kun- IDA / 59070 Water Supply Investments Post Direct Selection Direct 0.00 Completed 1 0 1 4 7 7 4 1 Tuu, Kyzyl-Tuu, Tolok and Alekseevka subprojects IDA-SRWSSDP-IC-2018-40 / Consultant for rehabilitati on of indoor sanitary facilit Individual Cons 2019-02-1 2019-02-1 2019-04-0 2017-12-1 2019-04-2 2017-12-2 2019-05-2 2018-01-2 2019-11-2 2018-06-1 IDA / 59070 Sanitation Development Post Open 11,354.54 Completed ies in schools and SES of C ultant Selection 1 3 1 1 2 5 7 3 3 8 hui, Issyk-Kul oblasts with survey, preparation of BoQ and drawings. (1st Phase) IDA-SRWSSDP-IC-2018-29 / Consultant for rehabilitati on of indoor sanitary facilit Individual Cons 2019-02-1 2019-02-1 2019-04-0 2018-07-2 2019-04-2 2018-07-2 2019-05-2 2018-08-0 2019-11-2 2019-02-1 IDA / 59070 Sanitation Development Post Open 13,095.72 Completed ies in schools and SES of C ultant Selection 1 3 1 3 2 3 7 8 3 2 hui, Issyk-Kul oblasts with survey, preparation of BoQ and drawings. (2st phase) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-1 2019-04-2 2019-03-2 2019-05-2 2019-04-0 2020-06-3 2021-03-1 TF / A1605 Post Open 13,784.66 Completed 2019-1 / Validation Consult g ultant Selection 1 3 1 3 2 2 7 6 0 9 ant ( # 1) IDA-SRWSSDP-DS-2018-4 / Consultants for Author su 2019-02-1 2019-02-1 2019-02-2 2019-03-0 2019-04-2 2019-03-2 2019-10-2 2019-09-1 pervision for rehabilitation IDA / 59070 Sanitation Development Post Direct Selection Direct 5,191.15 Completed 1 3 1 1 7 0 4 4 of indoor sanitary facilities in schools and SES of Chui, Issyk-Kul oblasts (1st phas e). IDA-SRWSSDP-IC-2018-41 / Consultant for rehabilitati on of indoor sanitary facilit Individual Cons 2019-02-1 2019-02-1 2019-04-0 2017-12-1 2019-04-2 2017-12-2 2019-05-2 2018-01-2 2019-11-2 2018-06-1 IDA / 59070 Sanitation Development Post Open 11,487.34 Completed ies in schools and SES of O ultant Selection 1 3 1 1 2 5 7 3 3 8 sh oblast with survey, prep aration of BoQ and drawin gs. (1st phase) IDA-SRWSSDP-DS-2018-5 / Consultants for Author su 2019-02-1 2019-02-1 2019-02-2 2019-05-0 2019-04-2 2019-03-2 2019-10-2 2019-09-1 pervision for rehabilitation IDA / 59070 Sanitation Development Post Direct Selection Direct 5,014.66 Completed 1 3 1 1 7 1 4 4 of indoor sanitary facilities in schools and SES of Osh oblast (1st phase). IDA-SRWSSDP-IC-2018-30 / Consultant for rehabilitati on of indoor sanitary facilit Individual Cons 2019-02-1 2019-02-1 2019-04-0 2018-07-1 2019-04-2 2018-07-2 2019-05-2 2018-07-3 2019-11-2 2019-01-3 IDA / 59070 Sanitation Development Post Open 17,016.71 Completed ies in schools and SES of O ultant Selection 1 3 1 8 2 3 7 0 3 1 sh oblast with survey, prep aration of BoQ and drawin gs. (2st phase) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-1 2019-04-2 2019-03-2 2019-05-2 2019-03-2 2020-06-3 2021-03-0 TF / A1605 Post Open 10,202.42 Completed 2019-2 / Validation Consult g ultant Selection 1 3 1 3 2 2 7 5 0 5 ant ( # 2) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-1 2019-04-2 2019-03-2 2019-05-2 2019-03-2 2020-06-3 2021-02-0 TF / A1605 Post Open 10,202.42 Completed 2019-3 / Validation Consult g ultant Selection 1 3 1 3 2 2 7 5 0 5 ant ( # 3) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-1 2019-04-2 2019-03-2 2019-05-2 2019-03-2 2020-06-3 2020-11-0 TF / A1605 Post Open 9,658.29 Completed 2019-4 / Validation Consult g ultant Selection 1 3 1 3 2 2 7 5 0 4 ant ( # 4) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-1 2019-04-2 2019-03-2 2019-05-2 2019-03-2 2020-06-3 2021-03-0 TF / A1605 Post Open 9,658.29 Completed 2019-5 / Validation Consult g ultant Selection 1 3 1 3 2 2 7 2 0 1 ant ( # 5) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-2 2019-04-2 2019-03-2 2019-05-2 2019-03-2 2020-06-3 2021-04-0 TF / A1605 Post Open 15,933.25 Completed 2019-6 / Validation Consult g ultant Selection 1 3 1 2 2 2 7 8 0 6 ant ( # 6) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-2 2019-04-2 2019-03-2 2019-05-2 2019-03-2 2020-06-3 2021-04-0 TF / A1605 Post Open 15,933.25 Completed 2019-7 / Validation Consult g ultant Selection 1 3 1 2 2 2 7 8 0 6 ant ( # 7) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-2 2019-04-2 2019-03-2 2019-05-2 2019-03-2 2020-06-3 2021-04-0 TF / A1605 Post Open 15,933.25 Completed 2019-8 / Validation Consult g ultant Selection 1 3 1 2 2 2 7 8 0 6 ant ( # 8) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-2 2019-04-2 2019-03-2 2019-05-2 2019-03-2 2020-06-3 2021-04-0 TF / A1605 Post Open 15,939.04 Completed 2019-9 / Validation Consult g ultant Selection 1 3 1 2 2 2 7 8 0 6 ant ( # 9) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-2 2019-04-2 2019-03-2 2019-05-2 2019-03-2 2020-06-3 2021-04-0 TF / A1605 Post Open 15,939.04 Completed 2019-10 / Validation Consu g ultant Selection 1 3 1 2 2 2 7 8 0 6 ltant ( # 10) IDA-SRWSSDP-IC-2019-9 / Technical Supervisor for El Individual Cons 2019-03-0 2019-02-2 2019-03-1 2019-04-0 2019-04-0 2019-04-0 2019-05-0 2019-04-2 2019-11-0 2019-06-2 IDA / 59070 Water Supply Investments Post Limited 1,679.74 Completed ectrical Installation, Pre-co ultant Selection 8 8 3 5 3 9 8 5 4 6 mmissioning and Electricit y Supply IDA-SRWSSDP-IC-2017-16 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-0 2018-07-1 IDA / 59070 Sanitation Development Post Open 5,050.95 Terminated / Trеiner-facilitator in Kura ultant Selection 1 0 9 0 0 9 4 3 3 ma IDA-SRWSSDP-IC-2019-8 / Individual Cons 2019-02-1 2019-12-2 2019-04-0 2020-06-3 2019-04-2 2020-06-3 2019-05-3 2020-07-0 2019-11-2 IDA / 59070 Water Supply Investments Post Open 29,538.31 Signed Quality Assurance Enginee ultant Selection 5 5 5 0 6 0 1 1 7 r IDA-SRWSSDP-IC-2019-31 Institutional Strengthenin Individual Cons 2019-04-1 2019-04-0 2019-04-1 2019-04-1 2019-05-0 2019-06-1 2022-06-0 / Senior Institutional Devel TF / A1605 Prior Limited 0.00 Canceled g ultant Selection 2 4 7 0 8 2 8 opment Advisor IDA-SRWSSDP-IC-2019-32 Individual Cons 2019-04-1 2019-06-2 2019-04-1 2019-07-2 2019-05-0 2019-08-0 2019-06-1 2019-08-1 2019-12-0 2020-01-0 IDA / 59070 Water Supply Investments Post Limited 2,500.00 Completed / Supervision Engineer/Hyd ultant Selection 2 0 7 9 8 6 2 3 9 9 rogeologist IDA-SRWSSDP-IC-2019-33 Individual Cons 2019-04-1 2019-04-1 2019-04-1 2020-03-1 2019-05-0 2020-04-3 2019-06-1 2020-05-2 2020-06-0 2021-01-1 / Field technical supervisio IDA / 59070 Water Supply Investments Post Limited 7,050.02 Completed ultant Selection 2 0 7 6 8 0 2 4 6 6 n for Ichke-Bulun subproje ct IDA-SRWSSDP-IC-2019-34 Individual Cons 2019-04-1 2019-04-1 2019-04-1 2019-07-0 2019-05-0 2019-07-0 2019-06-1 2019-08-0 2020-06-0 2020-01-1 / Field technical supervisio IDA / 59070 Water Supply Investments Post Limited 8,513.23 Completed ultant Selection 2 0 7 1 8 8 2 5 6 6 n for Korul subproject IDA-SRWSSDP-IC-2019-35 Individual Cons 2019-04-1 2019-04-1 2019-04-1 2020-03-1 2019-05-0 2020-04-3 2019-06-1 2020-05-2 2020-06-0 2021-10-1 / Junior field technical supe IDA / 59070 Water Supply Investments Post Limited 7,944.02 Completed ultant Selection 2 0 7 6 8 0 2 4 6 3 rvision for Korul subproject IDA-SRWSSDP-IC-2019-36 Individual Cons 2019-04-1 2019-04-1 2019-04-1 2019-05-0 2019-06-1 2020-06-0 / Junior field technical supe IDA / 59070 Water Supply Investments Post Limited 0.00 Canceled ultant Selection 2 0 7 8 2 6 rvision for Ichke-Bulun sub project IDA-SRWSSDP-IC-2019-37 / Local expert on social mo Institutional Strengthenin Individual Cons 2019-04-1 2019-04-1 2019-04-1 2020-01-1 2019-05-0 2020-01-1 2019-06-1 2021-06-0 IDA / 59070 Post Limited 0.00 Canceled bilization and institutional g ultant Selection 2 0 7 0 8 3 2 1 development in Ichke-Bulu n subproject IDA-SRWSSDP-IC-2019-38 / Local expert on social mo Institutional Strengthenin Individual Cons 2019-04-1 2019-04-1 2019-04-1 2020-01-0 2019-05-0 2020-01-1 2019-06-1 2021-06-0 IDA / 59070 Post Limited 0.00 Canceled bilization and institutional g ultant Selection 2 0 7 8 8 0 2 1 development in Korul subp roject IDA-SRWSSDP-IC-2019-29 / Local expert on social mo Institutional Strengthenin Individual Cons 2019-04-1 2019-04-1 2019-04-1 2019-03-1 2019-05-0 2019-03-1 2019-06-1 2019-03-2 2021-06-0 2020-01-0 IDA / 59070 Post Limited 5,902.25 Completed bilization and institutional g ultant Selection 2 0 7 1 8 2 2 8 1 7 development in Chelpek s ubproject IDA-SRWSSDP-IC-2019-30 / Local expert on social mo Institutional Strengthenin Individual Cons 2019-04-1 2019-04-1 2019-04-1 2019-03-1 2019-05-0 2019-03-1 2019-06-1 2019-03-2 2021-06-0 2020-01-0 IDA / 59070 Post Limited 5,493.86 Completed bilization and institutional g ultant Selection 2 0 7 1 8 2 2 8 1 7 development in Darkan su bproject IDA-SRWSSDP-IC-2019-10 Individual Cons 2019-04-1 2019-04-1 2019-04-1 2019-03-1 2019-05-0 2019-03-2 2019-06-1 2019-03-2 2020-06-0 2020-01-0 / Field technical supervisio IDA / 59070 Water Supply Investments Post Limited 12,857.14 Completed ultant Selection 2 0 7 2 8 0 2 8 6 7 n for Chelpek subproject IDA-SRWSSDP-IC-2019-11 Individual Cons 2019-04-1 2019-04-1 2019-04-1 2019-03-1 2019-05-0 2019-03-2 2019-06-1 2019-03-2 2020-06-0 2020-12-0 / Field technical supervisio IDA / 59070 Water Supply Investments Post Limited 17,420.81 Completed ultant Selection 2 0 7 2 8 2 2 8 6 7 n for Darkan subproject IDA-SRWSSDP-IC-2019-12 Individual Cons 2019-04-1 2019-04-1 2019-04-1 2019-03-1 2019-05-0 2019-03-2 2019-06-1 2019-03-2 2020-06-0 2020-01-0 / Junior field technical supe IDA / 59070 Water Supply Investments Post Limited 5,560.41 Completed ultant Selection 2 0 7 2 8 0 2 8 6 7 rvision for Chelpek subproj ect IDA-SRWSSDP-IC-2019-13 Individual Cons 2019-04-1 2019-04-1 2019-04-1 2019-03-1 2019-05-0 2019-03-2 2019-06-1 2019-04-0 2020-06-0 2020-11-1 / Junior field technical supe IDA / 59070 Water Supply Investments Post Limited 10,430.21 Completed ultant Selection 2 0 7 2 8 0 2 3 6 5 rvision for Darkan subproje ct IDA-SRWSSDP-IC-2018-15 / Consultant Development of the training manual and Individual Cons 2018-02-0 2018-02-0 2018-02-0 2018-03-2 2018-02-2 2018-04-0 2018-04-0 2018-04-0 2018-10-0 2019-04-0 IDA / 59070 Sanitation Development Post Limited 11,670.24 Completed related materials for the R ultant Selection 2 8 7 2 8 2 4 8 1 6 esult-Based Sanitation Gra nts for household sanitatio n improvements IDA-SRWSSDP-SSS-19-1 / Consulting company for de 2019-07-3 2019-08-2 2019-08-1 2019-08-2 2019-09-0 2020-01-0 sign development / adapta IDA / D1380 Water Supply Investments Post Direct Selection Direct 0.00 Canceled 1 1 0 1 8 6 tion for rural water supply subproject Chaichy, Osh O blast IDA-SRWSSDP-IC-2019-17 Individual Cons 2019-08-2 2019-08-2 2019-08-3 2020-01-2 2019-09-2 2020-01-3 2019-10-1 2020-02-1 2020-10-1 2020-11-1 / PR consultant for commu IDA / D1380 Sanitation Development Post Limited 8,645.58 Completed ultant Selection 3 3 0 8 0 0 8 6 7 3 nication strategy IDA-SRWSSDP-IC-2019-14 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-2 IDA / D1380 Sanitation Development Post Limited 5,822.71 Completed / Field sanitation officer in ultant Selection 0 4 4 4 4 5 1 7 6 0 schools #1 IDA-SRWSSDP-IC-2019-15 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-1 IDA / D1380 Sanitation Development Post Limited 5,822.71 Completed / Field sanitation officer in ultant Selection 0 4 4 4 4 5 1 4 6 7 schools #2 IDA-SRWSSDP-IC-2019-16 Individual Cons 2019-01-1 2019-01-1 2019-01-1 2019-03-1 2019-02-0 2019-03-1 2019-03-1 2019-04-0 2019-12-0 2020-01-1 IDA / D1380 Sanitation Development Post Limited 5,822.71 Completed / Field sanitation officer in ultant Selection 0 4 5 4 5 5 2 4 7 7 schools #3 Page 6 IDA-SRWSSDP-IC-19-17 / F Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-1 IDA / D1380 Sanitation Development Post Limited 5,822.71 Completed ield sanitation officer in sc ultant Selection 0 4 4 4 4 5 1 4 6 7 hools #4 IDA-SRWSSDP-IC-2019-18 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-2 IDA / D1380 Sanitation Development Post Limited 5,826.72 Completed / Field sanitation officer in ultant Selection 0 4 4 5 4 8 1 7 6 0 schools #5 IDA-SRWSSDP-IC-2019-19 Individual Cons 2019-01-1 2019-01-1 2019-01-1 2019-03-1 2019-02-0 2019-03-1 2019-03-1 2019-04-0 2019-12-0 2020-01-2 IDA / D1380 Sanitation Development Post Limited 5,826.72 Completed / Field sanitation officer in ultant Selection 0 4 7 5 7 8 4 7 9 0 schools #6 IDA-SRWSSDP-IC-2019-20 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-2 / Field sanitation officer in IDA / D1380 Sanitation Development Post Limited 5,823.51 Completed ultant Selection 0 4 4 4 4 5 1 7 6 0 communities #1 IDA-SRWSSDP-IC-2019-21 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-2 / Field sanitation officer in IDA / D1380 Sanitation Development Post Limited 5,823.51 Completed ultant Selection 0 4 4 4 4 5 1 7 6 0 communities #2 IDA-SRWSSDP-IC-2019-22 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-1 / Field sanitation officer in IDA / D1380 Sanitation Development Post Limited 5,823.51 Completed ultant Selection 0 4 4 4 4 5 1 4 6 7 communities #3 IDA-SRWSSDP-IC-2019-23 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-1 / Field sanitation officer in IDA / D1380 Sanitation Development Post Limited 5,823.51 Completed ultant Selection 0 4 4 4 4 5 1 4 6 7 communities #4 IDA-SRWSSDP-IC-2019-24 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-2 / Field sanitation officer in IDA / D1380 Sanitation Development Post Limited 5,822.71 Completed ultant Selection 0 4 4 4 4 5 1 7 6 0 communities #5 IDA-SRWSSDP-IC-2019-25 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-1 / Field sanitation officer in IDA / D1380 Sanitation Development Post Limited 5,823.51 Completed ultant Selection 0 4 4 4 4 5 1 4 6 7 communities #6 IDA-SRWSSDP-IC-2019-26 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-2 / Field sanitation officer in IDA / D1380 Sanitation Development Post Limited 5,826.72 Completed ultant Selection 0 4 4 5 4 8 1 7 6 0 communities #7 IDA-SRWSSDP-IC-2019-27 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-2 / Field sanitation officer in IDA / D1380 Sanitation Development Post Limited 5,826.72 Completed ultant Selection 0 4 4 5 4 8 1 7 6 0 communities #8 IDA-SRWSSDP-IC-2019-28 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-2 / Field sanitation officer in IDA / D1380 Sanitation Development Post Limited 5,826.72 Completed ultant Selection 0 4 4 5 4 8 1 7 6 0 communities #9 IDA-SRWSSDP-AF-IC-2019 -39 / Independent Verificat ion Agent (IVA) for Househ Individual Cons 2019-12-1 2019-12-1 2019-12-2 2020-01-2 2020-01-1 2020-01-2 2020-02-1 2020-02-1 2021-02-1 2020-03-0 IDA / D1380 Sanitation Development Post Limited 466.07 Completed old Sanitary Facilities in Ak ultant Selection 3 3 3 1 3 7 7 9 6 8 -Bulak and Kotormo pilot v illages Kyrgyz-Ata subproj ect Osh Oblast IDA-SRWSSDP-IC-INST-20 Institutional Strengthenin Individual Cons 2020-01-2 2020-01-3 2020-02-2 2020-03-2 2023-04-0 20-1-RT1 / Senior Institutio TF / A1605 Post Limited 0.00 Canceled g ultant Selection 4 1 1 7 1 nal Development Advisor IDA-SRWSSDP-IC-19-10 / Individual Cons 2019-01-1 2019-05-2 2019-01-2 2019-06-2 2019-02-1 2019-06-2 2019-03-2 2019-07-0 2020-03-2 2020-01-0 Consultant on promoting IDA / D1380 Sanitation Development Post Limited 4,535.57 Completed ultant Selection 0 7 4 6 4 8 1 7 0 7 WASH in schools and ISH i n communities IDA-SRWSSDP-IC-2019-18 Individual Cons 2019-06-0 2019-06-0 2019-06-0 2019-08-2 2019-06-2 2019-08-2 2019-08-0 2019-09-0 2019-08-0 2022-06-3 IDA / D1380 Sanitation Development Post Limited 20,413.39 Completed -AF / Sanitation Subsidy Co ultant Selection 3 3 8 3 9 6 3 2 6 0 nsultant IDA-SRWSSDP-IC-СOMP2- 2020-1 / Consultant for Tra ining of Trainers in “Active Individual Cons 2020-02-0 2020-05-0 2020-02-2 2020-03-1 2020-04-1 2021-04-1 legal regulatory acts in dri IDA / D1380 Sanitation Development Post Limited 0.00 Canceled ultant Selection 7 1 1 3 7 7 nking water supply and sa nitation for strengthening t he management (supervisi on) of water safety and qu ality in the Kyrgyz Republi IDA-SRWSSDP-IC-СOMP2- c” 2020-2 / Consultant for Tra Individual Cons 2020-02-0 2020-05-0 2020-02-2 2020-03-1 2020-04-1 2020-05-2 IDA / D1380 Sanitation Development Post Limited 0.00 Canceled ining in Water Quality Moni ultant Selection 7 1 1 3 7 3 toring Software in SES Rai on Offices IDA-SRWSSDP-IC-СOMP2- 2020-3 / Consultant for De Individual Cons 2020-02-0 2020-05-0 2020-02-2 2020-05-2 2020-03-1 2020-05-2 2020-04-1 2020-06-1 2021-04-1 2021-04-1 velopment of Basic Regula IDA / D1380 Sanitation Development Post Limited 4,727.20 Completed ultant Selection 7 1 1 5 3 7 7 4 7 3 tory Document for Constru ction of Household Sanitati on Facilities IDA-SRWSSDP-IC-TRNG-20 20-8 / Consultant-trainers f Institutional Strengthenin Individual Cons 2020-02-0 2020-02-1 2020-03-2 2020-06-1 2020-04-1 2020-08-0 2020-05-2 2020-08-3 2020-11-1 2022-01-1 IDA / D1380 Post Open 1,815.53 Completed or LSGB, CDWUU and othe g ultant Selection 7 0 7 2 7 3 2 1 8 7 r rural water services provi ders’ staff training (# 8) IDA-SRWSSDP-IC-TRNG-20 20-9 / Consultant-trainers f Institutional Strengthenin Individual Cons 2020-02-0 2020-02-1 2020-02-1 2020-06-1 2020-03-0 2020-08-0 2020-04-0 2020-08-3 2020-10-0 2021-09-0 IDA / D1380 Post Limited 3,135.92 Completed or LSGB, CDWUU and othe g ultant Selection 7 0 2 2 4 3 8 1 5 1 r rural water services provi ders’ staff training (# 9) IDA-SRWSSDP-IC-TRNG-20 20-10 / Consultant-trainers Institutional Strengthenin Individual Cons 2020-02-0 2020-02-1 2020-02-1 2020-06-1 2020-03-0 2020-08-0 2020-04-0 2020-08-3 2020-10-0 2022-01-1 IDA / D1380 Post Limited 1,815.53 Completed for LSGB, CDWUU and oth g ultant Selection 7 0 2 2 4 3 8 1 5 7 er rural water services pro viders’ staff training (# 10 ) IDA-SRWSSDP-IC-TRNG-20 20-11 / Consultant-trainers Institutional Strengthenin Individual Cons 2020-02-0 2020-02-1 2020-02-2 2020-06-1 2020-03-1 2020-08-0 2020-04-1 2020-08-3 2020-10-1 2022-01-1 IDA / D1380 Post Limited 2,900.14 Completed for LSGB, CDWUU and oth g ultant Selection 7 0 1 2 3 3 7 1 4 7 er rural water services pro viders’ staff training (# 11 ) IDA-SRWSSDP-IC-TRNG-20 20-12 / Consultant-trainers Institutional Strengthenin Individual Cons 2020-02-0 2020-02-1 2020-02-1 2020-06-1 2020-03-0 2020-08-0 2020-04-0 2020-08-3 2020-10-0 2022-01-1 IDA / D1380 Post Limited 3,135.92 Completed for LSGB, CDWUU and oth g ultant Selection 7 0 2 2 4 3 8 1 5 7 er rural water services pro viders’ staff training (# 12 ) IDA-SRWSSDP-IC-TRNG-20 20-13 / Consultant-trainers Institutional Strengthenin Individual Cons 2020-02-0 2020-02-1 2020-02-1 2020-06-1 2020-03-0 2020-08-0 2020-04-0 2020-08-3 2020-10-0 2022-01-1 IDA / D1380 Post Limited 1,815.53 Completed for LSGB, CDWUU and oth g ultant Selection 7 0 2 2 4 3 8 1 5 7 er rural water services pro viders’ staff training (# 13 ) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2020-02-0 2020-02-0 2020-03-2 2020-05-2 2020-04-1 2020-06-1 2020-05-2 2020-06-2 2021-05-2 2021-03-1 IDA / D1380 Post Open 5,969.46 Completed 2020-11 / Validation Consu g ultant Selection 7 3 7 1 7 0 2 9 2 6 ltant ( # 11) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2020-02-0 2020-02-0 2020-03-2 2020-05-2 2020-04-1 2020-06-1 2020-05-2 2020-06-2 2020-06-2 2021-04-1 IDA / D1380 Post Open 5,543.63 Completed 2020-12 / Validation Consu g ultant Selection 7 3 7 1 7 0 2 9 7 3 ltant ( # 12) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2020-02-0 2020-02-0 2020-03-2 2020-05-2 2020-04-1 2020-06-1 2020-05-2 2020-06-2 2021-05-2 2021-03-1 IDA / D1380 Post Open 5,542.48 Completed 2020-13 / Validation Consu g ultant Selection 7 3 7 1 7 0 2 9 2 6 ltant ( # 13) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2020-02-0 2020-02-0 2020-03-2 2020-05-2 2020-04-1 2020-06-1 2020-05-2 2020-06-2 2021-05-2 2021-01-1 IDA / D1380 Post Open 5,129.13 Completed 2020-14 / Validation Consu g ultant Selection 7 3 7 1 7 0 2 9 2 7 ltant ( # 14) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2020-02-0 2020-02-0 2020-03-2 2020-05-2 2020-04-1 2020-06-1 2020-05-2 2020-06-2 2020-06-2 2021-03-1 IDA / D1380 Post Open 5,541.72 Completed 2020-15 / Validation Consu g ultant Selection 7 3 7 1 7 0 2 9 7 6 ltant ( # 15) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2020-02-0 2020-02-0 2020-03-2 2020-05-2 2020-04-1 2020-06-1 2020-05-2 2020-06-2 2021-05-2 2021-01-1 IDA / D1380 Post Open 5,128.23 Completed 2020-16 / Validation Consu g ultant Selection 7 3 7 1 7 0 2 9 2 7 ltant ( # 16) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2020-02-0 2020-02-0 2020-03-2 2020-05-2 2020-04-1 2020-06-1 2020-05-2 2020-06-2 2021-05-2 2021-03-1 IDA / D1380 Post Open 5,128.23 Completed 2020-17 / Validation Consu g ultant Selection 7 3 7 1 7 0 2 9 2 6 ltant ( # 17) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2020-02-0 2020-02-0 2020-03-2 2020-05-2 2020-04-1 2020-06-1 2020-05-2 2020-06-2 2021-05-2 2021-04-1 IDA / D1380 Post Open 6,022.19 Completed 2020-18 / Validation Consu g ultant Selection 7 3 7 1 7 0 2 9 2 3 ltant ( # 18) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2020-02-0 2020-02-0 2020-03-2 2020-05-2 2020-04-1 2020-06-1 2020-05-2 2020-06-2 2021-05-2 2021-04-1 IDA / D1380 Post Open 6,022.19 Completed 2020-19 / Validation Consu g ultant Selection 7 3 7 1 7 0 2 9 2 3 ltant ( # 19) IDA-SRWSSDP-IC-2019-41 / Trainer on conducting tra Individual Cons 2019-09-0 2019-09-0 2019-09-0 2019-10-1 2019-09-2 2019-10-1 2019-11-0 2019-10-2 2020-04-3 2022-01-1 IDA / D1380 Sanitation Development Post Limited 1,866.04 Completed inings for sanitation field o ultant Selection 2 2 7 0 8 0 2 3 0 7 fficers on WASH in Schools Methodology IDA-SRWSSDP-IC-2019-42 / Trainer on conducting tra Individual Cons 2019-09-0 2019-09-0 2019-09-0 2019-10-1 2019-09-2 2019-10-0 2019-11-0 2019-10-2 2020-04-3 2022-01-1 inings for sanitation field o IDA / D1380 Sanitation Development Post Limited 1,866.04 Completed ultant Selection 2 2 7 0 8 9 2 4 0 7 fficers on Household Sanit ation Improvement Metho dology IDA-SRWSSDP-IC-FIDS-20 20-1 / Local expert on soci Institutional Strengthenin Individual Cons 2019-11-0 2019-10-0 2019-11-1 2020-01-0 2019-12-0 2020-01-1 2020-01-1 2020-01-1 2021-01-0 2022-06-3 IDA / D1380 Post Limited 11,950.97 Completed al mobilization and institut g ultant Selection 1 7 5 8 6 0 0 3 9 0 ional development in Sary- Tash subproject IDA-SRWSSDP-IC-FIDS-20 20-2 / Local expert on soci Institutional Strengthenin Individual Cons 2019-11-0 2019-10-0 2019-11-1 2020-01-0 2019-12-0 2020-01-1 2020-01-1 2020-01-3 2021-01-0 2022-06-3 IDA / D1380 Post Limited 7,304.50 Completed al mobilization and institut g ultant Selection 1 7 5 8 6 0 0 0 9 0 ional development in Achy k-Suu subproject IDA-SRWSSDP-AF-IC-FIDS- 2020-2 / Local expert on s Institutional Strengthenin Individual Cons 2019-11-0 2019-10-0 2019-11-1 2020-01-1 2019-12-0 2020-01-1 2020-01-1 2020-02-0 2020-07-0 2022-06-3 IDA / D1380 Post Limited 11,463.69 Completed ocial mobilization and insti g ultant Selection 1 7 5 0 6 2 0 2 8 0 tutional development in Ak -Bulak subproject IDA-SRWSSDP-AF-IC-FIDS- 2020-4 / Local expert on s Institutional Strengthenin Individual Cons 2019-11-0 2019-10-0 2019-11-1 2020-01-1 2019-12-0 2020-01-1 2020-01-1 2020-02-0 2021-01-0 2021-10-1 IDA / D1380 Post Limited 10,050.10 Completed ocial mobilization and insti g ultant Selection 1 7 5 0 6 2 0 2 9 3 tutional development in Ta mga subproject IDA-SRWSSDP-IC-TS-2020- Individual Cons 2019-11-0 2019-10-0 2019-11-1 2020-03-1 2019-12-0 2020-04-3 2020-01-1 2020-05-2 2021-01-0 2021-12-1 3 / Field technical supervis IDA / D1380 Water Supply Investments Post Limited 12,421.67 Completed ultant Selection 1 7 5 6 6 0 0 4 9 7 ion engineer for Sary-Tash subproject IDA-SRWSSDP-IC-TS-2020- Individual Cons 2019-11-0 2019-10-0 2019-11-1 2020-03-1 2019-12-0 2020-04-3 2020-01-1 2020-05-2 2021-01-0 2021-12-1 4 / Field technical supervis IDA / D1380 Water Supply Investments Post Limited 12,307.58 Completed ultant Selection 1 7 5 6 6 0 0 4 9 7 ion engineer for Achyk-Suu subproject IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2019-11-0 2019-10-0 2019-11-1 2019-12-2 2019-12-0 2019-12-3 2020-01-1 2020-01-1 2021-01-0 2021-05-1 20-1 / Field technical super IDA / D1380 Water Supply Investments Post Limited 11,712.22 Completed ultant Selection 1 7 5 7 6 0 0 7 9 3 vision engineer for Tamga subproject IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2019-11-0 2019-10-0 2019-11-1 2019-12-3 2019-12-0 2020-01-2 2020-01-1 2020-03-1 2021-01-0 2021-09-1 20-2 / Field technical super IDA / D1380 Water Supply Investments Post Limited 12,941.96 Completed ultant Selection 1 7 5 1 6 2 0 4 9 3 vision engineer for Ak-Bula k subproject IDA-SRWSSDP-IC-2019-2 / Consultant-trainers for LSG Institutional Strengthenin Individual Cons 2019-01-0 2018-07-0 2019-01-0 2018-08-1 2019-01-1 2018-12-1 2019-01-3 2019-02-0 2019-07-3 2019-06-2 IDA / D1380 Post Limited 955.16 Completed B, CDWUU and other rural g ultant Selection 3 2 7 0 4 0 1 1 0 8 water services providers’ s taff training (# 2) IDA-SRWSSDP-IC-2019-6 / Consultant-trainers for LSG Institutional Strengthenin Individual Cons 2019-01-0 2018-07-0 2019-01-0 2018-08-1 2019-01-1 2018-12-1 2019-01-3 2019-02-0 2019-07-3 2019-06-2 IDA / D1380 Post Limited 567.12 Completed B, CDWUU and other rural g ultant Selection 3 2 7 0 4 0 1 1 0 8 water services providers’ s taff training (# 6) IDA-SRWSSDP-IC-2019-1 / Consultant-trainers for LSG Institutional Strengthenin Individual Cons 2019-01-0 2018-07-0 2019-01-0 2018-08-1 2019-01-1 2018-12-1 2019-01-3 2019-02-0 2019-07-3 2019-06-2 IDA / D1380 Post Limited 955.16 Completed B, CDWUU and other rural g ultant Selection 3 2 7 0 4 0 1 1 0 8 water services providers’ s taff training (# 1) IDA-SRWSSDP-IC-2019-5 / Consultant-trainers for LSG Institutional Strengthenin Individual Cons 2019-01-0 2018-07-0 2019-01-0 2018-08-1 2019-01-1 2018-12-1 2019-01-3 2019-02-0 2019-07-3 2019-06-2 IDA / D1380 Post Limited 596.98 Completed B, CDWUU and other rural g ultant Selection 3 2 7 0 4 0 1 1 0 8 water services providers’ s taff training (# 5) IDA-SRWSSDP-IC-2019-4 / Consultant-trainers for LSG Institutional Strengthenin Individual Cons 2019-01-0 2018-07-0 2019-01-0 2018-08-1 2019-01-1 2018-12-1 2019-01-3 2019-02-0 2019-07-3 2019-06-2 IDA / D1380 Post Limited 363.16 Completed B, CDWUU and other rural g ultant Selection 3 2 7 0 4 0 1 1 0 8 water services providers’ s taff training (# 4) IDA-SRWSSDP-IC-2019-3 / Consultant-trainers for LSG Institutional Strengthenin Individual Cons 2019-01-0 2018-07-0 2019-01-1 2018-08-1 2019-01-2 2018-12-1 2019-02-1 2019-02-0 2019-08-1 2019-06-2 IDA / D1380 Post Limited 567.13 Completed B, CDWUU and other rural g ultant Selection 3 2 0 0 4 0 7 1 6 8 water services providers’ s taff training (# 3) IDA-SRWSSDP-IC-2019-7 / Consultant-trainers for LSG Institutional Strengthenin Individual Cons 2019-01-0 2018-07-0 2019-01-0 2018-08-1 2019-01-1 2018-12-1 2019-01-3 2019-02-0 2019-07-3 2019-06-2 IDA / D1380 Post Limited 955.16 Completed B, CDWUU and other rural g ultant Selection 3 2 7 0 4 0 1 1 0 8 water services providers’ s taff training (# 7) IDA-SRWSSDP-CS-IC-2017 Individual Cons 2017-05-1 2017-07-0 2017-07-2 2017-09-0 2018-02-2 -6 / Field technical supervi IDA / 59070 Water Supply Investments Post Open 0.00 Canceled ultant Selection 9 7 8 1 8 sion engineer in Kyrgyz At a IDA-SRWSSDP-IC-2019-31 Institutional Strengthenin Individual Cons 2019-04-1 2020-01-0 2019-04-1 2020-03-0 2019-05-0 2020-03-0 2019-06-1 2020-03-1 2022-06-0 2023-06-3 -2 / Senior Institutional De IDA / D1380 Post Limited 24,314.68 Completed g ultant Selection 2 6 7 5 8 6 2 0 8 0 velopment Advisor IDA-SRWSSDP-IC-2019-11 -1 / Consultant for rehabilit ation of indoor sanitary fac Individual Cons 2019-05-2 2019-05-0 2019-06-0 2019-06-2 2019-06-2 2019-06-1 2019-08-0 2019-07-3 2020-07-3 2020-01-1 IDA / 59070 Sanitation Development Post Limited 8,703.29 Completed ilities in schools and SES of ultant Selection 7 1 6 0 7 8 1 1 1 5 Chui and Osh oblasts with survey, preparation of BoQ and drawings. (3rd phase) Page 7 IDA-SRWSSDP-IC-2019-12 -1 / Consultant for rehabilit ation of indoor sanitary fac Individual Cons 2019-05-2 2019-05-0 2019-06-0 2019-06-2 2019-06-2 2019-07-1 2019-08-0 2019-07-3 2020-07-3 2020-01-1 IDA / 59070 Sanitation Development Post Limited 9,191.97 Completed ilities in schools and SES of ultant Selection 7 1 6 0 7 9 1 1 1 5 Chui and Issyk-Kul oblasts with survey, preparation of BoQ and drawings. (3rd ph ase) IDA-SRWSSDP-IC-TS-2020- Individual Cons 2020-04-2 2020-04-0 2020-05-2 2020-05-2 2020-06-0 2020-05-2 2020-06-1 2020-06-0 2020-11-1 2021-01-0 5 / Field technical supervis IDA / D1380 Water Supply Investments Post Open 5,057.95 Completed ultant Selection 8 6 4 5 3 7 5 5 5 5 ion for extra works of Kyrg yz-Ata subproject IDA-SRWSSDP-IC-2018-28 Individual Cons 2018-05-0 2018-05-3 2018-06-1 2018-06-1 2018-07-1 2018-06-1 2018-08-1 2018-06-2 2019-08-1 2019-07-0 / Field technical supervisio IDA / D1380 Water Supply Investments Post Open 9,143.60 Completed ultant Selection 1 1 9 8 0 9 4 4 4 4 n engineer in Sultan (seco nd) IDA-SRWSSDP-IC-2018-25 Individual Cons 2018-05-0 2018-04-0 2018-06-1 2018-05-2 2018-07-1 2018-06-1 2018-08-1 2018-06-2 2019-08-1 2020-07-0 / Field technical supervisio IDA / D1380 Water Supply Investments Post Open 20,378.78 Completed ultant Selection 1 9 9 5 0 1 4 4 4 4 n engineer in Alekseevka IDA-SRWSSDP-IC-2018-22 Individual Cons 2018-05-0 2018-05-1 2018-06-1 2018-06-1 2018-07-1 2018-06-1 2018-08-1 2018-06-2 2019-08-1 2020-01-0 / Field technical supervisio IDA / D1380 Water Supply Investments Post Open 17,519.13 Completed ultant Selection 1 4 9 9 0 9 4 4 4 5 n engineer in Kun-Tuu IDA-SRWSSDP-IC-2018-23 Individual Cons 2018-05-0 2018-05-0 2018-06-1 2018-06-1 2018-07-1 2018-06-1 2018-08-1 2018-06-2 2019-08-1 2019-11-0 / Field technical supervisio IDA / D1380 Water Supply Investments Post Open 15,490.68 Completed ultant Selection 1 1 9 9 0 9 4 6 4 3 n engineer in Kyzyl-Tuu IDA-SRWSSDP-IC-2018-10 Individual Cons 2017-12-0 2017-12-0 2018-01-1 2018-01-1 2018-02-0 2018-01-1 2018-03-1 2018-01-2 2018-10-0 2018-06-0 IDA / D1380 Sanitation Development Post Open 2,721.99 Completed / Trеiner-facilitator ultant Selection 1 1 9 6 9 6 6 5 2 6 IDA-SRWSSDP-IC-2018-9 / Individual Cons 2017-12-0 2017-12-0 2018-01-1 2018-01-1 2018-02-0 2018-01-1 2018-03-1 2018-01-2 2018-10-0 2018-06-0 IDA / D1380 Sanitation Development Post Open 2,721.99 Completed Trеiner-facilitator ultant Selection 1 1 9 6 9 6 6 5 2 6 IDA-SRWSSDP-IC-2018-8 / Individual Cons 2017-12-0 2017-12-0 2018-01-1 2018-01-1 2018-02-0 2018-01-1 2018-03-1 2018-01-2 2018-10-0 2018-06-0 IDA / D1380 Sanitation Development Post Open 2,721.99 Completed Trеiner-facilitator ultant Selection 1 1 9 6 9 6 6 5 2 6 IDA-SRWSSDP-IC-2018-18 Individual Cons 2018-05-0 2018-04-0 2018-06-1 2018-05-2 2018-07-1 2018-05-2 2018-08-1 2018-06-0 2019-08-1 2020-01-0 / Junior field technical supe IDA / D1380 Water Supply Investments Post Open 9,079.22 Completed ultant Selection 1 9 9 5 0 8 4 4 4 8 rvision engineer in Aleksee vka IDA-SRWSSDP-IC-2018-33 Individual Cons 2018-09-0 2018-05-1 2018-10-2 2018-09-2 2018-11-1 2018-09-3 2018-12-1 2018-10-0 2019-12-1 2021-01-0 / Junior field technical supe IDA / D1380 Water Supply Investments Post Open 13,230.23 Completed ultant Selection 3 4 2 4 2 0 7 9 7 8 rvision engineer in Kyzyl-T uu IDA-SRWSSDP-IC-2018-26 Individual Cons 2018-05-0 2018-05-1 2018-06-1 2018-06-1 2018-07-1 2018-06-1 2018-08-1 2018-06-2 2019-08-1 / Junior field technical supe IDA / D1380 Water Supply Investments Post Open 8,759.57 Terminated ultant Selection 1 4 9 5 0 8 4 0 4 rvision engineer in Kun-Tu u IDA-SRWSSDP-DC-2019-2 / Consultants for Author su Individual Cons 2019-06-0 2019-07-0 2019-06-1 2019-07-1 2019-07-0 2019-07-1 2019-08-0 2019-07-2 2020-02-0 2020-01-0 pervision for rehabilitation IDA / D1380 Sanitation Development Post Direct 2,492.73 Completed ultant Selection 3 1 3 2 4 9 8 5 4 8 of indoor sanitary facilities in schools and SES of Issyk -Kul oblast (2nd phase). IDA-SRWSSDP-DC-2019-1 / Consultants for Author su Individual Cons 2019-06-0 2019-07-0 2019-06-1 2019-07-1 2019-07-0 2019-07-1 2019-08-0 2019-07-2 2020-08-0 2020-01-0 pervision for rehabilitation IDA / D1380 Sanitation Development Post Direct 2,217.47 Completed ultant Selection 3 1 3 2 4 9 8 5 7 8 of indoor sanitary facilities in schools and SES of Osh and Chui oblast (2nd phas e). IDA-SRWSSDP-SSS-18-7 / 2019-06-0 2019-07-0 2019-06-1 2019-07-0 2019-08-1 2019-07-0 2020-08-1 2020-03-3 Author supervision for WS IDA / D1380 Water Supply Investments Post Direct Selection Direct 7,859.40 Completed 3 1 3 2 7 5 6 1 S sub-projects in IK oblast: Chelpek, Darkhan IDA-SRWSSDP-SSS-18-8 / 2019-06-0 2019-06-2 2019-06-2 2019-07-0 2019-08-2 2019-07-0 2020-08-2 2021-11-3 Author supervision for Kor IDA / D1380 Water Supply Investments Post Direct Selection Direct 5,459.77 Completed 3 4 0 1 4 3 3 0 ul WSS sub-project in Oshl oblast IDA-SRWSSDP-SSS-18-9 / Author supervision for Tam 2019-06-0 2019-12-0 2019-06-2 2019-11-0 2019-08-2 2020-01-0 2020-08-2 2021-05-3 IDA / D1380 Water Supply Investments Post Direct Selection Direct 15,813.46 Completed ga, Ichke Bulun WSS sub-p 3 2 0 8 4 8 3 1 rojects in Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FIDS- 2020-3 / Local expert on s Institutional Strengthenin Individual Cons 2019-10-0 2019-10-0 2019-11-2 2020-01-1 2019-12-1 2020-01-1 2020-01-2 2020-01-2 2021-01-1 2021-01-0 IDA / D1380 Post Open 6,347.73 Completed ocial mobilization and insti g ultant Selection 7 7 5 0 6 0 0 4 9 8 tutional development in Ic hke-Bulun subproject IDA-SRWSSDP-AF-IC-FIDS- 2020-1 / Local expert on s Institutional Strengthenin Individual Cons 2019-10-0 2019-10-0 2019-11-2 2020-01-0 2019-12-1 2020-01-0 2020-01-2 2020-01-2 2021-01-1 2021-12-1 IDA / D1380 Post Open 12,641.55 Completed ocial mobilization and insti g ultant Selection 7 7 5 8 6 9 0 8 9 5 tutional development in Ko rul subproject IDA-SRWSSDP-IC-FSS-202 0-2 / Consultants on activit Individual Cons 2019-10-0 2019-10-0 2019-11-2 2019-12-3 2019-12-1 2020-01-0 2020-01-2 2020-01-2 2021-01-1 2020-11-1 IDA / D1380 Sanitation Development Post Open 6,135.59 Completed ies with communities and ultant Selection 7 7 5 0 6 6 0 8 9 5 householders in Achyk-Suu subproject IDA-SRWSSDP-AF-IC-FSS-2 020-5 / Consultants on acti Individual Cons 2019-10-0 2019-10-0 2019-11-2 2019-12-3 2019-12-1 2020-01-1 2020-01-2 2020-01-3 2021-01-1 2020-11-1 IDA / D1380 Sanitation Development Post Open 5,243.60 Completed vities with communities a ultant Selection 7 7 5 0 6 3 0 1 9 5 nd householders in Ak-Bul ak subproject IDA-SRWSSDP-AF-IC-FSS-2 020-1 / Consultants on acti Individual Cons 2019-10-0 2019-10-0 2019-11-2 2019-12-3 2019-12-1 2020-01-0 2020-01-2 2020-01-2 2021-01-1 2020-11-1 IDA / D1380 Sanitation Development Post Open 5,334.01 Completed vities with communities a ultant Selection 7 7 5 0 6 6 0 8 9 5 nd householders in Korul s ubproject #1 IDA-SRWSSDP-IC-FSS-202 0-1 / Consultants on activit Individual Cons 2019-10-0 2019-10-0 2019-11-2 2019-12-3 2019-12-1 2020-01-0 2020-01-2 2020-01-2 2021-01-1 2020-11-1 IDA / D1380 Sanitation Development Post Open 5,334.01 Completed ies with communities and ultant Selection 7 7 5 0 6 6 0 8 9 5 householders in Sary-Tash subproject IDA-SRWSSDP-AF-IC-FSS-2 020-2 / Consultants on acti Individual Cons 2019-10-0 2019-10-0 2019-11-2 2019-12-3 2019-12-1 2020-01-0 2020-01-2 2020-01-2 2021-01-1 2020-11-1 IDA / D1380 Sanitation Development Post Open 5,334.01 Completed vities with communities a ultant Selection 7 7 5 0 6 6 0 8 9 5 nd householders in Korul s ubproject #2 IDA-SRWSSDP-AF-IC-FSS-2 020-6 / Consultants on acti Individual Cons 2019-10-0 2019-10-0 2019-11-2 2019-12-3 2019-12-1 2020-01-2 2020-01-2 2020-02-1 2021-01-1 2020-11-1 IDA / D1380 Sanitation Development Post Open 4,881.97 Completed vities with communities a ultant Selection 7 7 5 0 6 0 0 1 9 5 nd householders in Ichke-B ulun subproject IDA-SRWSSDP-AF-IC-FSS-2 020-4 / Consultants on acti Individual Cons 2019-10-0 2019-10-0 2019-11-2 2019-12-3 2019-12-1 2020-01-1 2020-01-2 2020-01-3 2021-01-1 2020-11-1 IDA / D1380 Sanitation Development Post Open 5,243.60 Completed vities with communities a ultant Selection 7 7 5 0 6 3 0 1 9 5 nd householders in Tamga subproject IDA-SRWSSDP-AF-IC-FSS-2 020-3 / Consultants on acti Individual Cons 2019-10-0 2019-10-0 2019-11-2 2019-12-3 2019-12-1 2020-01-1 2020-01-2 2020-02-1 2021-01-1 2020-11-1 IDA / D1380 Sanitation Development Post Open 4,894.69 Completed vities with communities a ultant Selection 7 7 5 0 6 3 0 1 9 5 nd householders in Korul s ubproject #3 IDA-SRWSSDP-IC-2018-21 / Local expert on social mo Institutional Strengthenin Individual Cons 2018-05-2 2018-05-2 2018-07-0 2018-06-1 2018-07-3 2018-06-1 2018-09-0 2018-06-3 2019-09-0 2020-01-1 IDA / D1380 Post Open 10,027.78 Completed bilization and institutional g ultant Selection 1 1 9 4 0 5 3 0 3 5 development Kun-Tuu sub project IDA-SRWSSDP-IC-2018-16 / Local expert on social mo Institutional Strengthenin Individual Cons 2018-04-0 2018-04-0 2018-05-2 2018-04-3 2018-06-1 2018-05-1 2018-07-2 2018-06-0 2019-07-2 2020-01-1 IDA / D1380 Post Open 10,505.29 Completed bilization and institutional g ultant Selection 9 9 8 0 8 5 3 3 3 5 development Kyrgyz-Ata s ubproject ARIS-IDA-SRWSSDP-IC-20 18-24 / Local expert on so Institutional Strengthenin Individual Cons 2018-06-0 2018-06-0 2018-07-2 2018-06-2 2018-08-1 2018-06-2 2018-09-1 2017-06-2 2019-09-1 2019-12-3 IDA / D1380 Post Open 0.00 Completed cial mobilization and instit g ultant Selection 4 4 3 0 3 0 7 8 7 1 utional development Kura ma subproject IDA-SRWSSDP-IC-2018-19 / Local expert on social mo Institutional Strengthenin Individual Cons 2018-04-0 2018-04-0 2018-05-2 2018-05-1 2018-06-1 2018-05-2 2018-07-2 2018-06-1 2019-07-2 2020-01-1 IDA / D1380 Post Open 10,278.83 Completed bilization and institutional g ultant Selection 9 9 8 6 8 8 3 7 3 5 development Alekseevka s ubproject IDA-SRWSSDP-IC-2018-20 / Local expert on social mo Institutional Strengthenin Individual Cons 2018-04-0 2018-04-0 2018-05-2 2018-05-1 2018-06-1 2018-06-1 2018-07-2 2018-07-0 2019-07-2 2020-01-1 IDA / D1380 Post Open 9,789.36 Completed bilization and institutional g ultant Selection 9 9 8 6 8 1 3 2 3 5 development Tolok subpro ject IDA-SRWSSDP-IC-COMP2- 2020-4 / Consultant for the development of instruction Individual Cons 2020-06-0 2020-06-0 2020-07-2 2020-09-0 2020-08-1 2020-09-1 2020-09-1 2020-10-0 2021-03-1 2020-10-2 on preventing the spread IDA / D1380 Sanitation Development Post Open 712.80 Completed ultant Selection 2 5 1 1 1 5 5 5 4 5 of COVID-19 virus for a wid e range of people working with the population after q uarantine (for field activist s) IDA-SRWSSDP-IC-COMP2- 2020-5 / Consultant for the Individual Cons 2020-06-0 2020-06-0 2020-07-2 2020-07-1 2020-08-1 2020-08-1 2020-09-1 2020-09-0 2021-03-1 2020-10-0 development of informatio IDA / D1380 Sanitation Development Post Open 709.46 Completed ultant Selection 2 5 1 7 1 4 5 2 4 4 n-educational materials to prevent the spread of COV ID-19 virus in the Kyrgyz R epublic IDA-SRWSSDP-IC-COMP2- 2020-6 / Consultant for the development of designs fo Individual Cons 2020-06-0 2020-06-0 2020-07-2 2020-07-1 2020-08-1 2020-08-0 2020-09-1 2020-08-2 2021-03-1 2020-11-1 IDA / D1380 Sanitation Development Post Open 712.80 Completed r information-educational ultant Selection 2 5 1 7 1 3 5 3 4 5 materials to prevent the s pread of COVID-19 virus in the Kyrgyz Republic (first) IDA-SRWSSDP-IC-COMP2- 2020-7 / Consultant for the development of designs fo Individual Cons 2020-06-0 2020-06-0 2020-07-2 2020-08-1 2020-09-1 2021-03-1 IDA / D1380 Sanitation Development Post Open 0.00 Canceled r information-educational ultant Selection 2 5 1 1 5 4 materials to prevent the s pread of COVID-19 virus in the Kyrgyz Republic (seco nd) ARIS-IDA-SRWSSDP-SSS-1 8-8 / Preparation/revisiono 2020-06-0 2019-08-2 2020-06-1 2019-08-1 2020-08-1 2019-08-2 2021-02-1 2020-06-3 IDA / D1380 Water Supply Investments Post Direct Selection Direct 0.00 Completed f detailed designs for Chai 2 1 2 9 6 6 2 0 chi WSS sub-project in Osh oblast IDA-SRWSSDP-HO-IC-2018 Institutional Strengthenin Individual Cons 2017-11-2 2017-11-3 2018-01-1 2017-12-2 2018-02-0 2017-12-2 2018-03-1 2018-01-1 2019-03-1 2019-01-1 IDA / D1380 Post Open 17,969.04 Completed -5 / Institutional specialist g ultant Selection 7 0 5 0 5 5 2 6 2 7 IDA-SRWSSDP-IC-2018-17 Individual Cons 2018-04-0 2018-04-0 2018-05-2 2018-05-2 2018-06-1 2018-05-2 2018-07-1 2018-06-1 2019-07-1 2019-08-1 / Junior field technical supe IDA / D1380 Water Supply Investments Post Open 6,274.04 Completed ultant Selection 2 9 1 5 1 8 6 2 6 4 rvision engineer in Tolok ARIS-IDA-SRWSSDP-IC-18- Individual Cons 2018-05-0 2018-04-0 2018-06-1 2018-05-2 2018-07-1 2018-06-0 2018-08-1 2018-07-0 2019-08-1 2019-01-1 IDA / D1380 Water Supply Investments Post Open 6,220.79 Completed 7 / Infrastructure engineer ultant Selection 1 9 9 5 0 4 4 3 4 7 HO 3 ARIS-IDA-SRWSSDP-IC-20 Individual Cons 2019-04-0 2019-01-2 2019-05-2 2019-04-1 2019-06-1 2019-05-0 2019-07-1 2019-05-2 2020-07-1 2020-01-1 IDA / D1380 Water Supply Investments Post Open 10,420.39 Completed 19-12 / Infrastructure engi ultant Selection 1 1 0 9 0 6 5 7 4 7 neer HO 4 ARIS-IDA-SRWSSDP-IC-20 Individual Cons 2019-04-0 2019-01-2 2019-05-2 2019-04-1 2019-06-1 2019-05-0 2019-07-1 2019-05-2 2020-07-1 2020-01-1 IDA / D1380 Water Supply Investments Post Open 7,547.97 Completed 19-11 / Infrastructure engi ultant Selection 1 1 0 9 0 6 5 7 4 7 neer HO 5 IDA-SRWSSDP-IC-2018-24 Individual Cons 2018-05-0 2018-04-0 2018-06-1 2018-05-2 2018-07-1 2018-06-1 2018-08-1 2018-07-0 2019-02-1 2019-08-1 / Field technical supervisio IDA / D1380 Water Supply Investments Post Open 9,814.16 Completed ultant Selection 1 9 9 5 0 1 4 4 0 4 n engineer in Tolok IDA-SRWSSDP-AF-IC-FSS-2 020-7 / Consultants on acti Individual Cons 2020-01-0 2020-02-0 2020-02-1 2020-05-2 2020-03-1 2020-05-2 2020-04-1 2020-06-0 2021-04-1 2021-05-0 IDA / D1380 Sanitation Development Post Open 5,186.84 Completed vities with communities a ultant Selection 1 3 9 1 1 7 5 5 5 4 nd householders in Shalta subproject IDA-SRWSSDP-AF-IC-FSS-2 020-8 / Consultants on acti Individual Cons 2020-01-0 2020-02-0 2020-02-1 2020-05-2 2020-03-1 2020-05-2 2020-04-1 2020-06-0 2021-04-1 2021-03-0 IDA / D1380 Sanitation Development Post Open 4,976.25 Completed vities with communities a ultant Selection 1 3 9 1 1 7 5 5 5 5 nd householders in Belek s ubproject IDA-SRWSSDP-AF-IC-FIDS- 2020-7 / Local expert on s Institutional Strengthenin Individual Cons 2020-01-0 2020-02-0 2020-02-1 2020-07-2 2020-03-1 2020-07-2 2020-04-1 2020-08-0 2021-04-1 2022-06-3 IDA / D1380 Post Open 12,181.31 Completed ocial mobilization and insti g ultant Selection 1 3 9 7 1 9 5 3 5 0 tutional development in Sh alta subproject IDA-SRWSSDP-AF-IC-FIDS- 2020-6 / Local expert on s Institutional Strengthenin Individual Cons 2020-01-0 2020-02-0 2020-02-1 2020-07-2 2020-03-1 2020-07-2 2020-04-1 2020-08-0 2021-04-1 2022-06-3 IDA / D1380 Post Open 12,156.27 Completed ocial mobilization and insti g ultant Selection 1 3 9 7 1 9 5 3 5 0 tutional development in Be lek subproject IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2020-05-0 2020-05-0 2020-06-2 2020-06-0 2020-07-1 2020-06-1 2020-08-1 2020-07-0 2021-08-1 2021-07-0 20-5 / Field technical super IDA / D1380 Water Supply Investments Post Open 9,300.17 Completed ultant Selection 5 1 3 8 4 5 8 7 8 6 vision engineer in Shalta IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2020-05-0 2020-05-0 2020-06-2 2020-06-0 2020-07-1 2020-06-1 2020-08-1 2020-06-2 2021-08-1 2021-07-0 20-6 / Field technical super IDA / D1380 Water Supply Investments Post Open 9,575.06 Completed ultant Selection 5 1 3 8 4 5 8 8 8 6 vision engineer in Belek IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2020-05-0 2020-05-0 2020-06-2 2020-07-2 2020-07-1 2020-07-3 2020-08-1 2020-08-0 2021-08-1 2021-10-0 20-7 / Field technical super IDA / D1380 Water Supply Investments Post Open 10,180.60 Completed ultant Selection 5 5 3 8 4 0 8 9 8 6 vision engineer in Chon-Da ly IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2020-05-0 2020-08-0 2020-06-2 2020-11-1 2020-07-1 2020-11-2 2020-08-1 2020-12-0 2021-08-1 2021-12-0 20-8 / Field technical super IDA / D1380 Water Supply Investments Post Open 8,216.10 Completed ultant Selection 5 3 3 6 4 5 8 9 8 8 vision engineer in Kenesh IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2020-05-0 2020-07-0 2020-06-2 2020-08-2 2020-07-1 2020-08-2 2020-08-1 2020-09-0 2021-08-1 2021-11-0 20-9 / Field technical super IDA / D1380 Water Supply Investments Post Open 9,579.26 Completed ultant Selection 5 1 3 5 4 7 8 7 8 6 vision engineer in Kara-Do bo Page 8 IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2020-05-0 2020-06-1 2020-06-2 2020-07-2 2020-07-1 2020-07-2 2020-08-1 2020-08-0 2021-08-1 2022-06-3 20-10 / Field technical sup IDA / D1380 Water Supply Investments Post Open 15,756.59 Completed ultant Selection 5 5 3 7 4 9 8 3 8 0 ervision engineer in Chaic hi IDA-SRWSSDP-CS-SSS-202 2020-05-1 2020-05-1 2020-05-2 2020-05-2 2020-06-0 2020-06-0 2020-12-0 2021-06-3 0-3 / Author supervision fo IDA / 59070 Water Supply Investments Post Direct Selection Direct 0.00 Completed 8 5 3 9 5 1 4 0 r Ak-Bulak WSS sub-projec t in Issyk-Kul oblast IDA-SRWSSDP-CS-SSS-202 0-1 / Author supervision fo 2020-04-0 2020-04-0 2020-04-1 2020-04-1 2020-04-2 2020-04-2 2021-02-2 2021-09-2 IDA / D1380 Water Supply Investments Post Direct Selection Direct 0.00 Completed r Sary-Tash, Achyk-Suu WS 1 1 1 6 8 8 8 8 S sub-projects in Osh oblas t IDA-SRWSSDP-CS-SSS-202 0-2 / Author supervision fo 2020-05-1 2020-05-1 2020-05-2 2020-08-2 2020-06-0 2020-09-0 2020-10-0 2021-11-3 IDA / D1380 Water Supply Investments Post Direct Selection Direct 0.00 Completed r extra works Kyrgyz-Ata 8 5 3 7 5 1 3 0 WSS sub-project in Osh obl ast IDA-SRWSSDP-SSS-COMP3 -2020-1 / Company for revi Institutional Strengthenin 2020-06-1 2020-09-0 2020-06-2 2020-01-1 2020-09-0 2020-01-1 2021-09-0 2022-12-3 ew and Improvement of D IDA / D1380 Post Direct Selection Direct 0.00 Completed g 8 3 8 7 1 9 1 1 esign and Construction Sta ndards and Regulations for Water Supply and Sanitati on Sector IDA-SRWSSDP-SIASAR-SS S-2020-2 / Server Support Consultant for the Depart Institutional Strengthenin 2020-06-1 2020-06-1 2020-06-2 2020-06-1 2020-08-1 2020-09-0 2021-03-0 2020-12-2 ment of Development of D IDA / D1380 Post Direct Selection Direct 0.00 Completed g 8 9 8 9 1 1 9 8 rinking Water Supply and Wastewater Disposal of St ate Water Resources Agen cy under the Government of Kyrgyz Republic IDA-SRWSSDP-IC-FIDS-20 20-7 / Local expert in socia Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-0 2021-03-0 2020-07-0 IDA / D1380 Post Direct Selection Direct 3,083.76 Completed l mobilization and instituti g 3 3 2 7 7 8 7 6 onal development sub-proj ect Sultan IDA-SRWSSDP-IC-FIDS-20 20-4 / Local expert in socia Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-0 2021-03-0 2020-07-0 IDA / D1380 Post Direct Selection Direct 3,083.76 Completed l mobilization and instituti g 3 3 2 7 7 8 7 6 onal development under t he project in kun-Tuu IDA-SRWSSDP-IC-TS-2020- 2019-12-2 2019-12-3 2020-01-0 2019-12-2 2020-03-0 2019-12-3 2021-03-0 2021-11-3 2 / Field technical supervis IDA / D1380 Water Supply Investments Post Direct Selection Direct 14,376.10 Completed 3 1 2 5 7 1 7 0 ion engineer Korul ARIS-IDA-SRWSSDP-HO-19 Institutional Strengthenin 2018-12-2 2018-12-2 2019-01-0 2018-12-2 2019-03-0 2019-01-0 2020-03-0 2020-01-0 IDA / D1380 Post Direct Selection Direct 19,863.82 Completed -10 / Institutional specialist g 3 4 2 7 8 8 7 8 IDA-SRWSSDP-IC-2020-3 / Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2019-12-3 2021-03-0 2024-02-2 IDA / D1380 Post Direct Selection Direct 34,786.48 Completed Institutional specialist g 3 3 2 6 7 1 7 9 IDA-SRWSSDP-HO-IC-18-6 2017-12-2 2017-12-2 2018-01-0 2017-12-2 2018-03-0 2018-01-0 2019-03-0 2019-01-0 IDA / D1380 Sanitation Development Post Direct Selection Direct 17,082.54 Completed / Sanitation and hygene sp 3 5 2 6 8 7 8 8 ecialist ARIS-IDA-SRWSSDP-HO-19 2018-12-2 2018-12-2 2019-01-0 2018-12-2 2019-03-0 2019-01-0 2020-03-0 2020-01-0 IDA / D1380 Sanitation Development Post Direct Selection Direct 20,824.36 Completed -11 / Sanitation and hygen 3 4 2 6 8 8 7 8 e specialist IDA-SRWSSDP-IC-2020-4 / 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-0 2021-03-0 2023-07-3 IDA / D1380 Sanitation Development Post Direct Selection Direct 36,731.93 Completed Sanitation and hygene spe 3 3 2 7 7 8 7 1 cialist IDA-SRWSSDP-IC-FIDS-20 20-10 / Local expert on so Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-02-1 2020-01-0 2021-02-1 2020-07-0 IDA / D1380 Post Direct Selection Direct 2,843.36 Completed cial mobilization and instit g 3 3 2 7 1 8 0 6 utional development in Ch elpek subproject IDA-SRWSSDP-AF-IC-2020 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-0 2021-03-0 2021-01-0 IDA / D1380 Water Supply Investments Post Direct Selection Direct 12,144.79 Completed -1 / Infrastructure engineer 3 3 2 5 7 8 7 8 HO 5 ARIS-IDA-SRWSSDP-IC-HO 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2019-12-3 2021-03-0 2020-12-3 -AF-2020-13 / Infrastructur IDA / D1380 Water Supply Investments Post Direct Selection Direct 12,831.68 Completed 3 3 2 6 7 1 7 1 e engineer HO 4 IDA-SRWSSDP-AF-IC-2020 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 -6 / Consultant on promoti IDA / D1380 Sanitation Development Post Direct Selection Direct 26,518.06 Signed 3 3 2 7 7 7 7 ng WASH in schools and IS H in communities IDA-SRWSSDP-IC-2020-8 / 2019-12-2 2020-01-0 2020-03-0 2021-03-0 IDA / D1380 Water Supply Investments Post Direct Selection Direct 0.00 Canceled Electrical and mechanical 3 2 7 7 engineer IDA-SRWSSDP-IC-FIDS-20 20-3 / Local expert on soci Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 2021-01-1 IDA / D1380 Post Direct Selection Direct 6,881.40 Completed al mobilization and institut g 3 3 2 7 7 7 7 7 ional development Kun-Tu u subproject IDA-SRWSSDP-IC-FIDS-20 20-6 / Local expert on soci Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 2020-07-1 IDA / D1380 Post Direct Selection Direct 3,083.76 Completed al mobilization and institut g 3 3 2 7 7 7 7 3 ional development Tolok s ubproject IDA-SRWSSDP-IC-FIDS-20 20-5 / Local expert on soci Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 2020-10-1 IDA / D1380 Post Direct Selection Direct 5,233.52 Completed al mobilization and institut g 3 3 2 7 7 7 7 3 ional development Aleksee vka IDA-SRWSSDP-IC-FIDS-20 20-11 / Local expert on so Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 2021-01-1 IDA / D1380 Post Direct Selection Direct 6,894.55 Completed cial mobilization and instit g 3 3 2 7 7 7 7 7 utional development in Da rkan subproject IDA-SRWSSDP-IC-2020-9 / 2019-12-2 2019-12-2 2020-01-0 2020-03-0 2021-03-0 IDA / D1380 Water Supply Investments Post Direct Selection Direct 0.00 Under Review Supervision Engineer/Hydr 3 3 2 7 7 ogeologist IDA-SRWSSDP-IC-FIDS-20 2O-8 / Local expert in soci Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2019-12-3 2021-03-0 2020-06-3 IDA / D1380 Post Direct Selection Direct 0.00 Completed al mobilization and institut g 3 3 2 6 7 1 7 0 ional development sub-pro ject Sultan IDA-SRWSSDP-HO-IC-18-8 2017-12-2 2017-12-2 2018-01-0 2017-12-2 2018-03-0 2018-01-1 2019-03-0 2019-01-1 IDA / D1380 Water Supply Investments Post Direct Selection Direct 18,425.07 Completed / Infrastructure engineer 3 5 2 6 8 6 8 7 ARIS-IDA-SRWSSDP-HO-19 2018-12-2 2018-12-2 2019-01-0 2018-12-2 2019-03-0 2019-01-1 2020-03-0 2020-01-1 IDA / D1380 Water Supply Investments Post Direct Selection Direct 18,177.15 Completed -7 / Infrastructure engineer 3 4 2 5 8 7 7 7 ARIS-IDA-SRWSSDP-HO-20 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 2021-01-1 IDA / D1380 Water Supply Investments Post Direct Selection Direct 11,881.19 Completed 20-8 / Infrastructure engin 3 3 2 6 7 7 7 7 eer ARIS-IDA-SRWSSDP-HO-19 2018-12-2 2018-12-2 2019-01-0 2018-12-2 2019-03-0 2019-01-1 2020-03-0 2020-01-1 IDA / D1380 Water Supply Investments Post Direct Selection Direct 17,252.28 Completed -9 / Infrastructure engineer 3 4 2 6 8 7 7 7 HO 3 ARIS-IDA-SRWSSDP-HO-20 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 2021-01-1 IDA / D1380 Water Supply Investments Post Direct Selection Direct 10,100.73 Completed 20-7 / Infrastructure engin 3 3 2 5 7 7 7 7 eer HO 3 IDA-SRWSSDP-IC-FIDS-20 20-12 / Local expert in soci Institutional Strengthenin 2019-12-2 2019-12-3 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 2020-07-1 IDA / D1380 Post Direct Selection Direct 3,576.74 Completed al mobilization and institut g 3 1 2 7 7 7 7 3 ional development sub-pro ject Kyrgyz-Ata IDA-SRWSSDP-IC-2018-7 / Individual Cons 2017-12-2 2018-01-0 2018-02-1 2018-01-1 2018-03-0 2018-02-2 2018-04-0 2018-02-0 2019-04-0 2018-03-1 IDA / D1380 Water Supply Investments Post Open 4,419.96 Completed Infrastructure engineer ass ultant Selection 3 8 0 7 3 6 7 4 7 6 istant ARIS-IDA-SRWSSDP-IC-20 2017-12-2 2018-02-0 2018-01-0 2018-02-1 2018-03-0 2018-03-1 2019-03-0 2019-01-1 IDA / D1380 Water Supply Investments Post Direct Selection Direct 11,049.90 Completed 18-13 / Infrastructure engi 3 5 2 9 8 6 8 7 neer assistant ARIS-IDA-SRWSSDP-HO-19 2018-12-2 2018-12-2 2019-01-0 2018-12-2 2019-03-0 2019-01-1 2020-03-0 2020-01-1 IDA / D1380 Water Supply Investments Post Direct Selection Direct 12,559.95 Completed -8 / Infrastructure engineer 3 4 2 5 8 7 7 7 assistant IDA-SRWSSDP-IC-2020-2 / 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2019-12-3 2021-03-0 2021-12-3 IDA / D1380 Water Supply Investments Post Direct Selection Direct 17,115.06 Completed Infrastructure engineer ass 3 3 2 6 7 1 7 1 istant ARIS-IDA-SRWSSDP-HO-20 Individual Cons 2017-12-2 2018-01-0 2018-02-1 2018-03-0 2018-04-0 2019-04-0 IDA / D1380 Water Supply Investments Post Open 0.00 Canceled 18-14 / Assistant of safegu ultant Selection 3 1 0 3 7 7 ards specialist ARIS-IDA-SRWSSDP-HO-19 2018-12-2 2018-12-2 2019-01-0 2018-12-2 2019-03-0 2019-01-1 2020-03-0 2020-01-1 IDA / D1380 Water Supply Investments Post Direct Selection Direct 5,443.94 Completed -5 / Assistant of safeguard 3 4 2 5 8 7 7 7 s specialist IDA-SRWSSDP-IC-2020-5 / 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 2022-06-3 IDA / D1380 Water Supply Investments Post Direct Selection Direct 14,680.58 Completed Assistant of safeguards sp 3 3 2 7 7 7 7 0 ecialist IDA-SRWSSDP-IC-2020-7 / Sector Monitoring Specialis Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-3 2020-03-0 2019-12-3 2021-03-0 t for development and imp IDA / D1380 Post Direct Selection Direct 25,342.72 Signed g 3 3 2 0 7 1 7 lementation of Information System for Rural Water Su pply and Sanitation (SIASA R) IDA-SRWSSDP-IC-2020-12 / Web Developer Specialist Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 IDA / D1380 Post Direct Selection Direct 31,207.05 Signed Information System for Rur g 3 3 2 7 7 7 7 al Water Supply and Sanit ation (SIASAR) IDA-SRWSSDP-IC-FIDS-20 20-8 / Local expert in socia Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 2020-07-1 IDA / D1380 Post Direct Selection Direct 3,136.19 Completed l mobilization and instituti g 3 3 2 5 7 5 7 2 onal development sub-proj ect Sultan IDA-SRWSSDP-IC-2O19-12 / Web Developer Specialist Institutional Strengthenin 2018-12-2 2018-12-2 2019-01-0 2018-12-2 2019-03-0 2019-01-1 2020-03-0 2020-01-1 IDA / D1380 Post Direct Selection Direct 13,728.66 Completed Information System for Rur g 3 7 2 8 8 5 7 5 al Water Supply and Sanit ation (SIASAR) IDA-SRWSSDP-AF-IC-FSS-2 020-9 / Consultants on acti Individual Cons 2020-03-0 2020-06-0 2020-04-1 2020-07-2 2020-05-1 2020-07-3 2020-06-1 2020-08-1 2021-06-1 2021-05-1 IDA / 59070 Sanitation Development Post Open 4,251.63 Completed vities with communities an ultant Selection 1 8 9 7 0 0 4 7 4 4 d householders in Chon-Da ly subproject IDA-SRWSSDP-AF-IC-FSS-2 020-10 / Consultants on ac Individual Cons 2020-03-0 2020-06-2 2020-04-1 2020-07-2 2020-05-1 2020-07-3 2020-06-1 2020-08-1 2021-06-1 2021-05-1 IDA / 59070 Sanitation Development Post Open 4,251.62 Completed tivities with communities a ultant Selection 1 9 9 8 0 0 4 7 4 4 nd householders in Chaichi subproject IDA-SRWSSDP-AF-IC-FSS-2 020-11 / Consultants on ac Individual Cons 2020-03-0 2020-06-0 2020-04-1 2020-07-2 2020-05-1 2020-07-3 2020-06-1 2020-08-1 2021-06-1 2021-03-1 IDA / 59070 Sanitation Development Post Open 4,251.63 Completed tivities with communities a ultant Selection 1 8 9 7 0 0 4 7 4 7 nd householders in Kenesh subproject IDA-SRWSSDP-AF-IC-FSS-2 020-12 / Consultants on ac Individual Cons 2020-03-0 2020-06-0 2020-04-1 2020-07-2 2020-05-1 2020-07-3 2020-06-1 2020-08-1 2021-06-1 2021-05-1 IDA / 59070 Sanitation Development Post Open 4,251.63 Completed tivities with communities a ultant Selection 1 8 9 7 0 0 4 7 4 4 nd householders in Kara-D obo subproject IDA-SRWSSDP-AF-IC-FSS-2 020-13 / Consultants on ac Individual Cons 2020-03-0 2021-03-2 2020-04-1 2021-06-2 2020-05-1 2021-06-3 2020-06-1 2021-07-0 2021-06-1 2022-03-3 IDA / D2040 Sanitation Development Post Open 4,243.92 Completed tivities with communities a ultant Selection 1 1 9 8 0 0 4 1 4 1 nd householders in Kenesh subproject Osh oblast IDA-SRWSSDP-AF-IC-FSS-2 020-14 / Consultants on ac Individual Cons 2020-03-0 2021-03-2 2020-04-1 2021-06-2 2020-05-1 2021-06-3 2020-06-1 2021-07-0 2021-06-1 2022-03-3 IDA / 59070 Sanitation Development Post Open 4,243.92 Completed tivities with communities a ultant Selection 1 1 9 8 0 0 4 1 4 1 nd householders in Por sub project IDA-SRWSSDP-AF-IC-FIDS- 2020-8 / Local expert on s Institutional Strengthenin Individual Cons 2020-03-0 2020-06-2 2020-04-1 2020-07-2 2020-05-1 2020-07-3 2020-06-1 2020-08-1 2021-06-1 2021-01-1 IDA / 59070 Post Open 2,357.87 Completed ocial mobilization and insti g ultant Selection 1 2 9 7 0 1 4 7 4 7 tutional development in Ch on-Daly subproject IDA-SRWSSDP-AF-IC-FIDS- 2020-9 / Local expert on s Institutional Strengthenin Individual Cons 2020-03-0 2020-06-2 2020-04-1 2020-07-2 2020-05-1 2020-07-3 2020-06-1 2020-08-1 2021-06-1 2022-01-1 IDA / 59070 Post Open 5,187.32 Completed ocial mobilization and insti g ultant Selection 1 2 9 7 0 1 4 7 4 7 tutional development in Ch aichi subproject IDA-SRWSSDP-AF-IC-FIDS- 2020-10 / Local expert on Institutional Strengthenin Individual Cons 2020-03-0 2020-06-2 2020-04-1 2020-07-2 2020-05-1 2020-07-3 2020-06-1 2020-08-0 2021-06-1 2022-02-0 IDA / 59070 Post Open 8,423.40 Completed social mobilization and inst g ultant Selection 1 2 9 7 0 1 4 3 4 3 itutional development in K enesh subproject IDA-SRWSSDP-AF-IC-FIDS- 2020-11 / Local expert on Institutional Strengthenin Individual Cons 2020-03-0 2020-03-0 2020-04-1 2020-07-2 2020-05-1 2020-07-3 2020-06-1 2020-08-0 2021-06-1 2022-12-3 IDA / 59070 Post Open 11,978.28 Completed social mobilization and inst g ultant Selection 1 9 9 9 0 1 4 3 4 1 itutional development in K ara-Dobo subproject IDA-SRWSSDP-AF-IC-FIDS- 2020-12 / Local expert on Institutional Strengthenin Individual Cons 2020-03-0 2021-03-0 2020-04-1 2021-04-2 2020-05-1 2021-04-2 2020-06-1 2021-04-3 2021-06-1 2022-06-3 IDA / 59070 Post Open 6,601.92 Completed social mobilization and inst g ultant Selection 1 1 9 0 0 6 4 0 4 0 itutional development in K enesh subproject Osh obla st IDA-SRWSSDP-AF-IC-FIDS- 2020-13 / Local expert on Institutional Strengthenin Individual Cons 2020-03-0 2021-03-0 2020-04-1 2021-05-2 2020-05-1 2021-06-0 2020-06-1 2021-06-0 2021-06-1 2023-06-3 IDA / 59070 Post Open 6,044.60 Completed social mobilization and inst g ultant Selection 1 1 9 0 0 3 4 7 4 0 itutional development in P or subproject IDA-SRWSSDP-SIASAR-SS S-2020-1 / Programmer Co nsultant for the Departme Institutional Strengthenin 2020-06-1 2020-06-1 2020-06-2 2020-08-1 2020-11-0 nt of Development of Drin IDA / D1380 Post Direct Selection Direct 0.00 Canceled g 8 9 8 1 9 king Water Supply and Wa stewater Disposal of State Water Resources Agency u nder the Government of K yrgyz Republic Page 9 IDA-SRWSSDP-SIASAR-SS S-2020-1/2 / Programmer Consultant for the Depart Institutional Strengthenin 2020-11-0 2020-11-0 2020-11-1 2020-11-0 2021-01-0 2020-11-1 2021-04-0 2020-11-1 ment of Development of D IDA / D1380 Post Direct Selection Direct 2,475.87 Completed g 9 8 9 9 2 2 2 2 rinking Water Supply and Wastewater Disposal of St ate Water Resources Agen cy under the Government of Kyrgyz Republic IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-03-0 2021-03-2 2021-04-1 2021-06-2 2021-05-1 2021-06-2 2021-06-1 2021-07-0 2022-06-1 2022-12-3 21-1 / Field technical super IDA / 60880 Water Supply Investments Post Open 8,204.92 Completed ultant Selection 1 1 9 8 0 9 4 1 4 1 vision engineer in Kara-Jig ach Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2022-03-1 2023-03-3 2022-05-0 2023-05-1 2022-05-2 2023-05-1 2022-06-2 2023-05-1 2023-06-2 2024-05-3 22-1 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 Completed ultant Selection 5 1 3 1 4 8 8 8 8 1 vision engineer in Kayrma Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2022-03-1 2022-11-0 2022-05-0 2022-12-0 2022-05-2 2022-12-0 2022-06-2 2023-02-0 2023-06-2 2023-06-3 22-2 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 Completed ultant Selection 5 7 3 7 4 7 8 1 8 0 vision engineer in Vasilev Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2022-11-0 2021-12-2 2022-12-0 2022-01-1 2022-12-0 2022-02-1 2023-02-0 2023-02-1 2023-12-3 21-2 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 Completed ultant Selection 1 8 0 7 0 7 4 1 4 1 vision engineer in Komsom olskoe Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2023-03-3 2021-12-2 2023-11-1 2022-01-1 2023-11-1 2022-02-1 2023-11-2 2023-02-1 21-3 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 Signed ultant Selection 1 1 0 0 0 0 4 3 4 vision engineer in Bokso-Jo l Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2022-02-2 2021-12-2 2022-04-1 2022-01-1 2022-04-2 2022-02-1 2022-04-2 2023-02-1 2022-12-3 21-4 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 Completed ultant Selection 1 1 0 9 0 5 4 8 4 1 vision engineer in Sosnovk a Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-03-0 2021-03-2 2021-04-1 2021-07-2 2021-05-1 2021-07-2 2021-06-1 2021-08-0 2022-06-1 2022-06-3 21-5 / Field technical super IDA / 60880 Water Supply Investments Post Open 7,521.18 Completed ultant Selection 1 9 9 6 0 8 4 1 4 0 vision engineer in Ivanovk a station Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2022-03-1 2023-03-3 2022-05-0 2023-05-1 2022-05-2 2023-05-1 2022-06-2 2023-05-1 2023-06-2 22-3 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 Signed ultant Selection 5 1 3 1 4 8 8 8 8 vision engineer in Kurpuld ok Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons Under Impleme 2022-03-1 2023-03-3 2022-05-0 2022-05-2 2022-06-2 2023-06-2 22-4 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 ultant Selection ntation 5 1 3 4 8 8 vision engineer in Kum-Ary k Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2022-03-1 2023-03-3 2022-05-0 2023-05-1 2022-05-2 2023-05-1 2022-06-2 2023-05-1 2023-06-2 22-5 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 Signed ultant Selection 5 1 3 1 4 8 8 8 8 vision engineer in Orto-Ary k Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2022-02-0 2021-12-2 2022-02-1 2022-01-1 2022-02-2 2022-02-1 2022-03-0 2023-02-1 2023-12-3 21-6 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 Completed ultant Selection 1 7 0 7 0 3 4 1 4 1 vision engineer in Kaindy Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2021-05-2 2021-12-2 2021-11-1 2022-01-1 2021-11-2 2022-02-1 2021-11-2 2023-02-1 2023-06-3 21-7 / Field technical super IDA / 60880 Water Supply Investments Post Open 4,786.20 Completed ultant Selection 1 6 0 6 0 5 4 9 4 0 vision engineer in Boroldoi Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2023-04-0 2021-12-2 2022-07-2 2022-01-1 2022-08-0 2022-02-1 2022-08-0 2022-03-2 21-8 / Field technical super IDA / 60880 Water Supply Investments Post Open 1,827.70 Signed ultant Selection 1 6 0 7 0 9 4 9 2 vision engineer in Buloluu Osh oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2021-12-2 2022-01-1 2022-02-1 2023-02-1 21-9 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 Canceled ultant Selection 1 0 0 4 4 vision engineer in Toloikon Osh oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2022-06-2 2021-12-2 2022-07-2 2022-01-1 2022-08-0 2022-02-1 2022-08-0 2023-02-1 2023-12-3 21-10 / Field technical sup IDA / 60880 Water Supply Investments Post Open 1,827.70 Completed ultant Selection 1 7 0 7 0 9 4 9 4 1 ervision engineer in Erkin- Too Osh oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2023-03-3 2021-12-2 2023-05-0 2022-01-1 2023-05-1 2022-02-1 2023-05-1 2023-02-1 2023-06-3 21-11 / Field technical sup IDA / 60880 Water Supply Investments Post Open 0.00 Completed ultant Selection 1 1 0 3 0 1 4 1 4 0 ervision engineer in Kyzyl- Bairak Osh oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2022-03-0 2021-12-2 2022-04-1 2022-01-1 2022-04-2 2022-02-1 2022-04-2 2023-02-1 2024-07-3 21-12 / Field technical sup IDA / 60880 Water Supply Investments Post Open 0.00 Completed ultant Selection 1 1 0 9 0 5 4 8 4 1 ervision engineer in Kabyk Osh oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2022-06-2 2021-12-2 2022-10-1 2022-01-1 2022-10-2 2022-02-1 2022-11-0 2023-02-1 2023-10-3 21-13 / Field technical sup IDA / 60880 Water Supply Investments Post Open 0.00 Completed ultant Selection 1 7 0 9 0 4 4 1 4 1 ervision engineer in Enchil esh Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-08-0 2021-09-1 2021-10-1 2021-11-1 2022-11-1 21-14 / Field technical sup IDA / 60880 Water Supply Investments Post Open 0.00 Canceled ultant Selection 1 9 0 4 4 ervision engineer in Jeti-Og uz Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-08-0 2021-03-0 2021-09-1 2021-05-2 2021-10-1 2021-05-2 2021-11-1 2021-06-0 2022-11-1 2023-08-3 21-15 / Field technical sup IDA / 60880 Water Supply Investments Post Open 8,888.81 Completed ultant Selection 1 2 9 6 0 8 4 1 4 1 ervision engineer in Boz-B eshik Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2022-04-2 2021-12-2 2022-06-2 2022-01-1 2022-07-0 2022-02-1 2022-07-0 2023-02-1 2023-10-3 21-16 / Field technical sup IDA / 60880 Water Supply Investments Post Open 729.05 Completed ultant Selection 1 6 0 9 0 1 4 1 4 1 ervision engineer in Barbul ak Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2023-07-1 2021-12-2 2023-11-1 2022-01-1 2023-11-2 2022-02-1 2023-11-2 2023-02-1 21-17 / Field technical sup IDA / 60880 Water Supply Investments Post Open 0.00 Signed ultant Selection 1 0 0 0 0 0 4 3 4 ervision engineer in Kurmo ntu Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-09-0 2023-09-1 2021-10-2 2023-11-1 2021-11-1 2023-11-2 2021-12-1 2023-11-2 2022-12-1 21-18 / Field technical sup IDA / 60880 Water Supply Investments Post Open 0.00 Signed ultant Selection 1 8 0 0 0 1 5 3 5 ervision engineer in Kichi- Oruktuu Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-09-0 2023-03-3 2021-10-2 2023-05-0 2021-11-1 2023-05-0 2021-12-1 2023-05-0 2022-12-1 2024-06-3 21-19 / Field technical sup IDA / 60880 Water Supply Investments Post Open 0.00 Completed ultant Selection 1 1 0 2 0 3 5 3 5 0 ervision engineer in Jyluu- Bulak Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-06-0 2021-07-2 2021-08-1 2021-09-1 2022-09-1 21-20 / Field technical sup IDA / 60880 Water Supply Investments Post Open 0.00 Canceled ultant Selection 1 0 0 4 4 ervision engineer in Grigor evka Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-06-0 2024-10-2 2021-07-2 2021-08-1 2021-09-1 2022-09-1 21-21 / Field technical sup IDA / 60880 Water Supply Investments Post Open 0.00 Canceled ultant Selection 1 2 0 0 4 4 ervision engineer in Karool -Dobo Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2020-08-1 2020-08-1 2020-09-2 2020-12-2 2020-10-1 2020-12-2 2020-11-2 2020-12-3 2021-11-2 2022-11-3 20-11 / Field technical sup IDA / 60880 Water Supply Investments Post Open 13,172.42 Completed ultant Selection 0 0 8 1 9 5 3 1 3 0 ervision engineer in Gorna ya Maevka Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-01-1 2021-03-2 2021-02-2 2021-02-2 2021-03-2 2021-02-2 2021-04-2 2021-03-0 2022-04-2 2022-09-3 21-22 / Field technical sup IDA / 60880 Water Supply Investments Post Open 10,940.10 Completed ultant Selection 0 9 8 4 1 5 5 1 5 0 ervision engineer in Beishe ke Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-02-1 2021-03-0 2021-03-3 2021-05-2 2021-04-2 2021-05-2 2021-05-2 2021-06-1 2022-05-2 2022-01-1 21-23 / Field technical sup IDA / 60880 Water Supply Investments Post Open 4,786.35 Completed ultant Selection 0 2 1 4 1 8 6 1 6 2 ervision engineer in Ken-B ulun Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 021-1 / Consultants on acti Individual Cons 2021-03-0 2021-03-2 2021-04-1 2021-04-2 2021-05-1 2021-04-2 2021-06-1 2021-04-3 2022-03-1 2022-01-3 IDA / 60880 Sanitation Development Post Open 6,183.07 Completed vities with communities an ultant Selection 1 1 9 7 0 9 4 0 5 1 d householders in Kara-Jig ach Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 022-1 / Consultants on acti Individual Cons 2022-03-1 2023-03-0 2022-05-0 2023-06-1 2022-05-2 2023-06-1 2022-06-2 2023-06-1 2023-03-2 2024-04-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed vities with communities an ultant Selection 5 6 3 2 4 9 8 9 9 0 d householders in Kayrma Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 022-2 / Consultants on acti Individual Cons 2022-03-1 2022-11-0 2022-05-0 2023-01-1 2022-05-2 2023-01-1 2022-06-2 2024-02-1 2023-03-2 IDA / 60880 Sanitation Development Post Open 0.00 Signed vities with communities an ultant Selection 5 7 3 8 4 8 8 5 9 d householders in Vasilev Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 021-2 / Consultants on acti Individual Cons 2021-11-0 2022-11-0 2021-12-2 2018-01-1 2022-01-1 2023-01-1 2022-02-1 2023-02-1 2022-11-1 2023-10-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed vities with communities an ultant Selection 1 7 0 8 0 8 4 5 5 1 d householders in Komsom olskoe Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 021-3 / Consultants on acti Individual Cons 2021-11-0 2021-12-2 2022-01-1 2022-02-1 2022-11-1 IDA / 60880 Sanitation Development Post Open 0.00 Canceled vities with communities an ultant Selection 1 0 0 4 5 d householders in Bokso-Jo l Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 021-4 / Consultants on acti Individual Cons 2021-11-0 2022-02-1 2021-12-2 2022-04-2 2022-01-1 2022-04-2 2022-02-1 2022-04-2 2022-11-1 2022-12-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed vities with communities an ultant Selection 1 8 0 0 0 5 4 8 5 1 d householders in Sosnovk a Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 021-5 / Consultants on acti Individual Cons 2021-03-0 2021-03-2 2021-04-1 2021-04-2 2021-05-1 2021-04-2 2021-06-1 2021-05-1 2022-03-1 2022-01-1 IDA / 60880 Sanitation Development Post Open 4,244.22 Completed vities with communities an ultant Selection 1 1 9 7 0 9 4 4 5 7 d householders in Ivanovk a station Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 022-3 / Consultants on acti Individual Cons 2022-03-1 2023-03-0 2022-05-0 2023-06-2 2022-05-2 2023-06-2 2022-06-2 2023-06-3 2023-03-2 2024-04-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed vities with communities an ultant Selection 5 6 3 2 4 2 8 0 9 0 d householders in Kurpuld ok Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 022-4 / Consultants on acti Individual Cons 2022-03-1 2022-05-0 2022-05-2 2022-06-2 2023-03-2 IDA / 60880 Sanitation Development Post Open 0.00 Canceled vities with communities an ultant Selection 5 3 4 8 9 d householders in Kum-Ary k Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 022-5 / Consultants on acti Individual Cons 2022-03-1 2023-03-0 2022-05-0 2023-06-2 2022-05-2 2023-06-2 2022-06-2 2023-06-3 2023-03-2 2024-04-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed vities with communities an ultant Selection 5 6 3 2 4 7 8 0 9 0 d householders in Orto-Ary k Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 021-6 / Consultants on acti Individual Cons 2021-11-0 2022-02-2 2021-12-2 2022-04-2 2022-01-1 2022-04-2 2022-02-1 2022-04-2 2022-11-1 2023-03-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed vities with communities an ultant Selection 1 1 0 0 0 5 4 8 5 1 d householders in Kaindy Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 021-7 / Consultants on acti Individual Cons 2021-11-0 2021-06-0 2021-12-2 2021-08-2 2022-01-1 2021-08-2 2022-02-1 2021-09-0 2022-11-1 2023-12-3 IDA / 60880 Sanitation Development Post Open 4,244.01 Completed vities with communities an ultant Selection 1 1 0 5 0 5 4 1 5 1 d householders in Boroldoi Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 021-8 / Consultants on acti Individual Cons 2021-11-0 2022-06-2 2021-12-2 2022-07-2 2022-01-1 2022-08-0 2022-02-1 2022-08-0 2022-11-1 2023-04-3 IDA / 60880 Sanitation Development Post Open 1,267.09 Completed vities with communities an ultant Selection 1 7 0 7 0 9 4 9 5 0 d householders in Buloluu Osh oblast IDA-SRWSSDP-AF-IC-FSS-2 021-9 / Consultants on acti Individual Cons 2021-11-0 2023-03-0 2021-12-2 2023-06-1 2022-01-1 2023-06-1 2022-02-1 2023-06-1 2022-11-1 2024-04-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed vities with communities an ultant Selection 1 6 0 2 0 9 4 9 5 0 d householders in Toloikon Osh oblast IDA-SRWSSDP-AF-IC-FSS-2 021-10 / Consultants on ac Individual Cons 2021-11-0 2022-06-2 2021-12-2 2022-07-2 2022-01-1 2022-08-0 2022-02-1 2022-08-0 2022-11-1 2023-04-3 IDA / 60880 Sanitation Development Post Open 1,260.48 Completed tivities with communities a ultant Selection 1 7 0 7 0 9 4 9 5 0 nd householders in Erkin-T oo Osh oblast IDA-SRWSSDP-AF-IC-FSS-2 021-11 / Consultants on ac Individual Cons 2021-11-0 2023-03-0 2021-12-2 2023-06-1 2022-01-1 2023-06-1 2022-02-1 2023-06-1 2022-11-1 2024-04-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed tivities with communities a ultant Selection 1 6 0 2 0 9 4 9 5 0 nd householders in Kyzyl-B airak Osh oblast IDA-SRWSSDP-AF-IC-FSS-2 021-12 / Consultants on ac Individual Cons 2021-11-0 2022-03-0 2021-12-2 2022-04-1 2022-01-1 2022-04-2 2022-02-1 2022-04-2 2022-11-1 2022-12-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed tivities with communities a ultant Selection 1 1 0 5 0 5 4 8 5 0 nd householders in Kabyk Osh oblast IDA-SRWSSDP-AF-IC-FSS-2 021-13 / Consultants on ac Individual Cons 2021-11-0 2022-06-2 2021-12-2 2022-09-3 2022-01-1 2022-10-0 2022-02-1 2022-10-1 2022-11-1 2023-06-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed tivities with communities a ultant Selection 1 7 0 0 0 5 4 2 5 0 nd householders in Enchile sh Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FSS-2 021-14 / Consultants on ac Individual Cons 2021-08-0 2021-03-2 2021-09-1 2021-05-3 2021-10-1 2021-06-0 2021-11-1 2021-06-1 2022-08-1 2022-03-0 IDA / 60880 Sanitation Development Post Open 4,158.27 Completed tivities with communities a ultant Selection 1 1 9 1 0 3 4 1 5 5 nd householders in Jeti-Og uz Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FSS-2 021-15 / Consultants on ac Individual Cons 2021-08-0 2021-03-2 2021-09-1 2021-05-3 2021-10-1 2021-06-0 2021-11-1 2021-06-2 2022-08-1 2022-03-1 IDA / 60880 Sanitation Development Post Open 4,158.27 Completed tivities with communities a ultant Selection 1 1 9 1 0 3 4 1 5 6 nd householders in Boz-Be shik Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FSS-2 021-16 / Consultants on ac Individual Cons 2021-11-0 2022-04-2 2021-12-2 2022-06-0 2022-01-1 2022-06-0 2022-02-1 2022-06-0 2022-11-1 2023-02-2 IDA / 60880 Sanitation Development Post Open 3,360.56 Completed tivities with communities a ultant Selection 1 6 0 6 0 6 4 7 5 8 nd householders in Barbul ak Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FSS-2 021-17 / Consultants on ac Individual Cons 2021-11-0 2021-12-2 2022-01-1 2022-02-1 2022-11-1 IDA / 60880 Sanitation Development Post Open 0.00 Canceled tivities with communities a ultant Selection 1 0 0 4 5 nd householders in Kurmo ntu Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FSS-2 021-18 / Consultants on ac Individual Cons 2021-09-0 2021-10-2 2021-11-1 2021-12-1 2022-09-1 IDA / 60880 Sanitation Development Post Open 0.00 Canceled tivities with communities a ultant Selection 1 0 0 5 5 nd householders in Kichi-O ruktuu Issyk-Kul oblast Page 10 IDA-SRWSSDP-AF-IC-FSS-2 021-19 / Consultants on ac Individual Cons 2021-09-0 2022-06-2 2021-10-2 2022-09-3 2021-11-1 2022-10-0 2021-12-1 2022-10-1 2022-09-1 2023-06-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed tivities with communities a ultant Selection 1 7 0 0 0 5 5 2 5 0 nd householders in Jyluu-B ulak Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FSS-2 021-20 / Consultants on ac Individual Cons 2021-06-0 2023-03-0 2021-07-2 2023-06-2 2021-08-1 2023-06-2 2021-09-1 2023-06-3 2022-06-1 2024-06-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed tivities with communities a ultant Selection 1 6 0 7 0 9 4 0 5 0 nd householders in Grigore vka Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FSS-2 021-21 / Consultants on ac Individual Cons 2021-06-0 2021-07-2 2021-08-1 2021-09-1 2022-06-1 IDA / 60880 Sanitation Development Post Open 0.00 Canceled tivities with communities a ultant Selection 1 0 0 4 5 nd householders in Karool- Dobo Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FSS-2 020-15 / Consultants on ac Individual Cons 2020-08-1 2021-03-2 2020-09-2 2021-04-2 2020-10-1 2021-04-2 2020-11-2 2021-04-3 2021-08-2 2022-01-3 IDA / 60880 Sanitation Development Post Open 6,167.20 Completed tivities with communities a ultant Selection 0 9 8 7 9 9 3 0 4 1 nd householders in Gornay a Maevka Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 021-22 / Consultants on ac Individual Cons 2021-01-1 2021-03-2 2021-02-2 2021-04-2 2021-03-2 2021-04-2 2021-04-2 2021-05-0 2022-01-2 2022-02-0 IDA / 60880 Sanitation Development Post Open 4,244.12 Completed tivities with communities a ultant Selection 0 1 8 7 1 9 5 4 4 5 nd householders in Beishe ke Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 021-23 / Consultants on ac Individual Cons 2021-02-1 2021-03-2 2021-03-3 2021-04-2 2021-04-2 2021-04-2 2021-05-2 2021-04-3 2022-02-2 IDA / 60880 Sanitation Development Post Open 2,692.96 Signed tivities with communities a ultant Selection 0 1 1 7 1 9 6 0 4 nd householders in Ken-Bu lun Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-1 / Local expert on s Institutional Strengthenin Individual Cons 2021-03-0 2021-03-0 2021-04-1 2021-04-2 2021-05-1 2021-04-2 2021-06-1 2021-04-3 2022-06-1 2022-12-3 IDA / 60880 Post Open 6,601.92 Completed ocial mobilization and insti g ultant Selection 1 1 9 0 0 6 4 0 4 1 tutional development in Ka ra-Jigach Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2022-1 / Local expert on s Institutional Strengthenin Individual Cons 2022-03-1 2023-03-1 2022-05-0 2023-07-3 2022-05-2 2023-07-3 2022-06-2 2023-09-1 2023-06-2 IDA / 60880 Post Open 0.00 Signed ocial mobilization and insti g ultant Selection 5 3 3 1 4 1 8 8 8 tutional development in Ka yrma Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2022-2 / Local expert on s Institutional Strengthenin Individual Cons 2022-03-1 2022-11-0 2022-05-0 2023-01-1 2022-05-2 2023-01-1 2022-06-2 2023-02-0 2023-06-2 IDA / 60880 Post Open 0.00 Signed ocial mobilization and insti g ultant Selection 5 7 3 8 4 8 8 1 8 tutional development in Va silev Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-2 / Local expert on s Institutional Strengthenin Individual Cons 2021-11-0 2022-11-0 2021-12-2 2023-01-2 2022-01-1 2023-01-2 2022-02-1 2023-02-0 2023-02-1 IDA / 60880 Post Open 0.00 Signed ocial mobilization and insti g ultant Selection 1 7 0 4 0 3 4 1 4 tutional development in Ko msomolskoe Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-3 / Local expert on s Institutional Strengthenin Individual Cons 2021-11-0 2023-08-2 2021-12-2 2023-11-1 2022-01-1 2023-11-1 2022-02-1 2023-11-2 2023-02-1 IDA / 60880 Post Open 0.00 Signed ocial mobilization and insti g ultant Selection 1 4 0 0 0 0 4 7 4 tutional development in Bo kso-Jol Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-4 / Local expert on s Institutional Strengthenin Individual Cons 2021-11-0 2022-02-1 2021-12-2 2022-04-1 2022-01-1 2022-04-2 2022-02-1 2022-04-2 2023-02-1 IDA / 60880 Post Open 0.00 Signed ocial mobilization and insti g ultant Selection 1 8 0 8 0 5 4 8 4 tutional development in So snovka Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-5 / Local expert on s Institutional Strengthenin Individual Cons 2021-03-0 2021-03-0 2021-04-1 2021-04-1 2021-05-1 2021-04-1 2021-06-1 2021-04-1 2022-06-1 2023-12-3 IDA / 60880 Post Open 6,826.51 Completed ocial mobilization and insti g ultant Selection 1 1 9 6 0 9 4 9 4 1 tutional development in Iv anovka station Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2022-3 / Local expert on s Institutional Strengthenin Individual Cons 2022-03-1 2023-03-1 2022-05-0 2023-06-0 2022-05-2 2023-06-0 2022-06-2 2023-06-0 2023-06-2 IDA / 60880 Post Open 0.00 Signed ocial mobilization and insti g ultant Selection 5 3 3 6 4 7 8 7 8 tutional development in Ku rpuldok Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2022-5 / Local expert on s Institutional Strengthenin Individual Cons 2022-03-1 2023-03-1 2022-05-0 2023-06-0 2022-05-2 2023-06-0 2022-06-2 2023-06-0 2023-06-2 IDA / 60880 Post Open 0.00 Signed ocial mobilization and insti g ultant Selection 5 3 3 6 4 7 8 7 8 tutional development in Or to-Aryk Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-6 / Local expert on s Institutional Strengthenin Individual Cons 2021-11-0 2022-01-0 2021-12-2 2022-03-2 2022-01-1 2022-03-3 2022-02-1 2022-04-0 2023-02-1 2023-12-3 IDA / 60880 Post Open 0.00 Completed ocial mobilization and insti g ultant Selection 1 5 0 9 0 1 4 1 4 1 tutional development in Ka indy Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-7 / Local expert on s Institutional Strengthenin Individual Cons 2021-11-0 2021-05-2 2021-12-2 2021-08-2 2022-01-1 2021-08-2 2022-02-1 2021-09-0 2023-02-1 IDA / 60880 Post Open 2,263.50 Signed ocial mobilization and insti g ultant Selection 1 4 0 7 0 7 4 1 4 tutional development in Bo roldoi Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-8 / Local expert on s Institutional Strengthenin Individual Cons 2021-11-0 2022-06-2 2021-12-2 2022-07-2 2022-01-1 2022-08-0 2022-02-1 2022-08-1 2023-02-1 IDA / 60880 Post Open 1,267.09 Signed ocial mobilization and insti g ultant Selection 1 7 0 7 0 9 4 4 4 tutional development in Bu loluu Osh oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-9 / Local expert on s Institutional Strengthenin Individual Cons 2021-11-0 2023-03-1 2021-12-2 2023-06-0 2022-01-1 2023-06-0 2022-02-1 2023-06-0 2023-02-1 IDA / 60880 Post Open 0.00 Signed ocial mobilization and insti g ultant Selection 1 3 0 6 0 7 4 7 4 tutional development in To loikon Osh oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-10 / Local expert on Institutional Strengthenin Individual Cons 2021-11-0 2022-06-2 2021-12-2 2022-07-2 2022-01-1 2022-08-0 2022-02-1 2022-08-0 2023-02-1 2023-06-3 IDA / 60880 Post Open 1,260.48 Completed social mobilization and inst g ultant Selection 1 7 0 7 0 9 4 9 4 0 itutional development in Er kin-Too Osh oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-11 / Local expert on Institutional Strengthenin Individual Cons 2021-11-0 2023-03-1 2021-12-2 2023-06-0 2022-01-1 2023-06-0 2022-02-1 2023-06-0 2023-02-1 2023-12-3 IDA / 60880 Post Open 0.00 Completed social mobilization and inst g ultant Selection 1 3 0 6 0 7 4 7 4 1 itutional development in K yzyl-Bairak Osh oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-12 / Local expert on Institutional Strengthenin Individual Cons 2021-11-0 2022-03-0 2021-12-2 2022-04-1 2022-01-1 2022-04-2 2022-02-1 2022-04-2 2023-02-1 IDA / 60880 Post Open 0.00 Signed social mobilization and inst g ultant Selection 1 1 0 8 0 5 4 8 4 itutional development in K abyk Osh oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-13 / Local expert on Institutional Strengthenin Individual Cons 2021-11-0 2022-06-2 2021-12-2 2022-09-2 2022-01-1 2022-10-0 2022-02-1 2022-10-1 2023-02-1 2024-06-3 IDA / 60880 Post Open 0.00 Completed social mobilization and inst g ultant Selection 1 7 0 0 0 3 4 2 4 0 itutional development in E nchilesh Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-14 / Local expert on Institutional Strengthenin Individual Cons 2021-08-0 2021-03-0 2021-09-1 2021-05-2 2021-10-1 2021-05-2 2021-11-1 2021-06-0 2022-11-1 2023-12-3 IDA / 60880 Post Open 7,253.53 Completed social mobilization and inst g ultant Selection 1 1 9 0 0 5 4 7 4 1 itutional development in Je ti-Oguz Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-15 / Local expert on Institutional Strengthenin Individual Cons 2021-08-0 2021-03-0 2021-09-1 2021-05-2 2021-10-1 2021-05-2 2021-11-1 2021-06-0 2022-11-1 2022-12-3 IDA / 60880 Post Open 6,951.30 Completed social mobilization and inst g ultant Selection 1 1 9 0 0 5 4 7 4 1 itutional development in B oz-Beshik Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-16 / Local expert on Institutional Strengthenin Individual Cons 2021-11-0 2022-04-2 2021-12-2 2022-06-0 2022-01-1 2022-06-0 2022-02-1 2022-06-0 2023-02-1 IDA / 60880 Post Open 3,360.56 Signed social mobilization and inst g ultant Selection 1 6 0 6 0 6 4 7 4 itutional development in B arbulak Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-17 / Local expert on Institutional Strengthenin Individual Cons 2021-11-0 2023-08-2 2021-12-2 2023-11-1 2022-01-1 2023-11-1 2022-02-1 2023-11-2 2023-02-1 IDA / 60880 Post Open 0.00 Signed social mobilization and inst g ultant Selection 1 4 0 0 0 4 4 7 4 itutional development in K urmontu Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-18 / Local expert on Institutional Strengthenin Individual Cons 2021-09-0 2023-10-1 2021-10-2 2023-11-1 2021-11-1 2023-11-1 2021-12-1 2023-11-2 2022-12-1 IDA / 60880 Post Open 0.00 Signed social mobilization and inst g ultant Selection 1 3 0 0 0 0 5 7 5 itutional development in Ki chi-Oruktuu Issyk-Kul oblas t IDA-SRWSSDP-AF-IC-FIDS- 2021-19 / Local expert on Institutional Strengthenin Individual Cons 2021-09-0 2022-06-2 2021-10-2 2022-10-0 2021-11-1 2022-10-1 2021-12-1 2022-10-1 2022-12-1 2024-06-3 IDA / 60880 Post Open 0.00 Completed social mobilization and inst g ultant Selection 1 7 0 1 0 2 5 2 5 0 itutional development in Jy luu-Bulak Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-20 / Local expert on Institutional Strengthenin Individual Cons 2021-06-0 2023-03-1 2021-07-2 2023-06-0 2021-08-1 2023-06-0 2021-09-1 2023-06-0 2022-09-1 IDA / 60880 Post Open 0.00 Signed social mobilization and inst g ultant Selection 1 3 0 6 0 7 4 7 4 itutional development in G rigorevka Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FIDS- 2020-14 / Local expert on Institutional Strengthenin Individual Cons 2020-08-1 2021-03-0 2020-09-2 2021-04-2 2020-10-1 2021-04-2 2020-11-2 2021-04-3 2021-11-2 2023-12-3 IDA / 60880 Post Open 6,602.55 Completed social mobilization and inst g ultant Selection 0 2 8 0 9 6 3 0 3 1 itutional development in G ornaya Maevka Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-22 / Local expert on Institutional Strengthenin Individual Cons 2021-01-1 2021-03-0 2021-02-2 2021-04-1 2021-03-2 2021-04-1 2021-04-2 2021-04-1 2022-04-2 2021-12-3 IDA / 60880 Post Open 3,997.23 Completed social mobilization and inst g ultant Selection 0 1 8 6 1 6 5 9 5 1 itutional development in B eisheke Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-23 / Local expert on Institutional Strengthenin Individual Cons 2021-02-1 2021-03-0 2021-03-3 2021-04-1 2021-04-2 2021-04-1 2021-05-2 2021-04-1 2022-05-2 2022-06-3 IDA / 60880 Post Open 6,826.51 Completed social mobilization and inst g ultant Selection 0 1 1 6 1 9 6 9 6 0 itutional development in K en-Bulun Chui oblast IDA-SRWSSDP-IC-TRNG-20 20-14 / Consultant-trainers Institutional Strengthenin Individual Cons 2020-02-0 2020-02-1 2020-03-0 2020-04-0 2020-10-0 IDA / D1380 Post Limited 0.00 Canceled for LSGB, CDWUU and oth g ultant Selection 7 2 4 8 5 er rural water services pro viders’ staff training (# 14 ) IDA-SRWSSDP-CS-SSS-202 2021-06-0 2022-11-0 2021-06-1 2022-11-1 2021-08-1 2022-11-1 2022-08-1 1-2 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct 0.00 Signed 1 8 1 1 5 4 5 r 5 WSS sub-projects in Os h oblast (2 Phase) IDA-SRWSSDP-CS-SSS-202 1-1 / Author supervision fo 2021-04-0 2021-06-2 2021-04-1 2021-06-2 2021-06-1 2021-07-0 2022-06-1 2023-05-3 IDA / 60880 Water Supply Investments Post Direct Selection Direct 0.00 Completed r 4 WSS sub-projects in Iss 1 2 1 8 5 1 5 1 yk-Kul oblast (1 Phase) IDA-SRWSSDP-CS-SSS-202 1-3 / Author supervision fo 2021-11-0 2022-10-1 2021-11-1 2022-10-1 2022-01-1 2022-10-2 2023-01-1 IDA / 60880 Water Supply Investments Post Direct Selection Direct 0.00 Signed r 5 WSS sub-projects in Iss 1 9 1 9 5 1 5 yk-Kul oblast (2 Phase) IDA-SRWSSDP-CS-SSS-202 2020-12-0 2020-10-2 2020-12-1 2020-10-2 2021-02-1 2020-11-0 2022-02-1 2023-12-3 0-5 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct 0.00 Completed 1 0 1 1 4 1 4 1 r 4 WSS sub-projects in Os h oblast (1 Phase) IDA-SRWSSDP-CS-SSS-202 2020-08-1 2020-07-2 2020-08-2 2020-08-0 2020-10-3 2020-08-1 2021-10-3 2022-12-3 0-4 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct 0.00 Completed 7 2 7 5 1 7 1 1 r 10 WSS sub-projects in C hui oblast (1 Phase) IDA-SRWSSDP-CS-SSS-202 2021-11-0 2021-11-1 2022-01-1 2023-01-1 1-4 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct 0.00 Canceled 1 1 5 5 r 5 WSS sub-projects in Ch ui oblast (3 Phase) IDA-SRWSSDP-CS-SSS-202 2021-11-0 2023-03-2 2021-11-1 2023-03-3 2022-01-1 2023-03-3 2023-01-1 1-5 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct 0.00 Signed 1 8 1 0 5 1 5 r 5 WSS sub-projects in Ch ui oblast (2 Phase) IDA-SRWSSDP-AF-IC-EIA-2 021 / Consultant for Engin eering, Environmental and Individual Cons 2021-02-0 2021-02-2 2021-02-2 2021-03-0 2021-03-0 2021-04-1 Sanitary Safety Review (as IDA / D2040 Water Supply Investments Post Open 0.00 Canceled ultant Selection 3 4 7 2 6 0 sess and forecast the impa ct of the water supply proj ect and prepared designs on utilities, environmental and sanitary safety) IDA-SRWSSDP-AF-IC-FSS-2 020-2-RT1 / Consultants o Individual Cons 2020-05-0 2020-05-0 2020-06-1 2020-06-1 2020-07-1 2020-06-1 2020-08-1 2020-06-2 2021-02-1 2020-11-0 IDA / 60880 Sanitation Development Post Open 2,061.39 Completed n activities with communiti ultant Selection 1 1 9 5 0 8 4 3 0 4 es and householders in Kor ul subproject #2 IDA-SRWSSDP-IC-COMP2- 2020-5/1 / Consultant for t he development of inform Individual Cons 2020-06-0 2020-06-0 2020-07-2 2020-07-1 2020-08-1 2020-08-1 2020-09-2 2020-08-2 2021-03-2 2020-09-2 IDA / 60880 Sanitation Development Post Open 709.46 Completed ation-educational material ultant Selection 9 5 8 7 8 4 2 4 1 5 s to prevent the spread of COVID-19 virus in the Kyrg yz Republic (second) IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2020-08-0 2020-08-0 2020-09-1 2020-11-1 2020-10-1 2020-11-2 2020-11-1 2020-12-0 2021-11-0 2022-01-0 20-13 / Field technical sup IDA / 60880 Water Supply Investments Post Open 8,229.75 Completed ultant Selection 1 1 9 7 0 5 4 6 9 5 ervision engineer in Por Os h oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2020-08-0 2020-08-0 2020-09-1 2020-11-1 2020-10-1 2020-11-2 2020-11-1 2020-12-0 2021-11-0 2022-06-3 20-12 / Field technical sup IDA / 60880 Water Supply Investments Post Open 12,323.87 Completed ultant Selection 1 1 9 7 0 5 4 1 9 0 ervision engineer in Kenes h Osh oblast IDA-SRWSSDP-AF-IC-2019 -40 / Consultant on verific ation of household sanitat Individual Cons 2020-09-1 2020-09-1 2020-10-2 2020-11-2 2020-11-1 2020-11-2 2020-12-2 2020-12-0 2021-06-2 2021-02-0 IDA / 60880 Sanitation Development Post Open 1,414.19 Completed ion facilities in pilot village ultant Selection 0 0 9 5 9 6 4 5 2 5 s Ak-Bulak and Kotormo Ky rgyz-Ata ayil okmotu, Nook at district, Osh oblast. IDA-SRWSSDP-DC-2020-1 / Аuthor supervision of sub 2020-09-0 2020-09-0 2020-09-1 2020-09-1 2020-11-1 2020-10-0 2021-05-1 2021-09-3 IDA / 59070 Sanitation Development Post Direct Selection Direct 7,029.95 Completed -projects for outside toilets 1 1 1 6 5 1 4 0 in Chui and Osh oblasts (3 rd phase) IDA-SRWSSDP-DC-2020-2 / Аuthor supervision of sub 2020-09-0 2020-09-2 2020-09-1 2020-09-2 2020-11-1 2020-10-0 2021-05-1 2021-06-3 IDA / 59070 Sanitation Development Post Direct Selection Direct 0.00 Completed -projects for outside toilets 1 2 1 8 5 1 4 0 in Chui and Issuk-Kul obla sts (3rd phase) Page 11 IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-04-2 2021-04-3 2021-05-1 2021-05-2 2021-05-3 2021-06-0 2021-06-1 2021-06-0 2022-06-1 2022-12-3 20-11-1 / Junior field techn IDA / 60880 Water Supply Investments Post Limited 5,283.80 Completed ultant Selection 6 0 0 4 1 3 4 7 4 1 ical supervision engineer i n Gornaya Maevka IDA-SRWSSDP-AF-IC-2021 Individual Cons 2021-04-2 2021-04-3 2021-05-1 2021-06-2 2021-05-3 2021-07-0 2021-06-1 2021-07-0 2022-06-1 -20 / Sanitation Subsidy Co IDA / D2040 Sanitation Development Post Limited 6,982.22 Signed ultant Selection 6 0 0 5 1 5 4 7 4 nsultant of Chuy oblast IDA-SRWSSDP-AF-IC-2021 Individual Cons 2021-04-2 2021-04-3 2021-05-1 2021-06-2 2021-05-3 2021-07-0 2021-06-1 2021-07-0 2022-06-1 2022-06-3 -21 / Sanitation Subsidy Co IDA / D2040 Sanitation Development Post Limited 3,586.97 Completed ultant Selection 6 0 0 5 1 5 4 7 4 0 nsultant of Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FIDS- 2020-27 / Local expert on Institutional Strengthenin Individual Cons 2021-05-0 2021-05-0 2021-06-2 2021-06-2 2021-07-1 2021-06-2 2021-08-1 2021-07-0 2022-08-1 2023-12-3 IDA / 60880 Post Open 5,658.65 Completed social mobilization and inst g ultant Selection 4 3 2 1 3 8 7 1 7 1 itutional development in K yzyl Zhar subproject IDA-SRWSSDP-AF-IC-FIDS- 2020-28 / Local expert on Institutional Strengthenin Individual Cons 2021-05-0 2021-05-0 2021-06-2 2021-07-2 2021-07-1 2021-07-2 2021-08-1 2021-08-0 2022-08-1 IDA / 60880 Post Open 5,187.09 Signed social mobilization and inst g ultant Selection 4 3 2 0 3 8 7 1 7 itutional development in K oo Chaty subproject IDA-SRWSSDP-AF-IC-FSS-2 020-27 / Consultants on ac Individual Cons 2021-05-0 2021-03-3 2021-06-2 2021-06-2 2021-07-1 2021-06-2 2021-08-1 2021-07-0 2022-05-1 2022-03-3 IDA / 60880 Sanitation Development Post Open 4,244.12 Completed tivities with communities a ultant Selection 4 0 2 8 3 9 7 1 8 1 nd householders in Kyzyl Z har subproject IDA-SRWSSDP-AF-IC-FSS-2 020-28 / Consultants on ac Individual Cons 2021-05-0 2021-03-3 2021-06-2 2021-06-2 2021-07-1 2021-06-2 2021-08-1 2021-07-0 2022-05-1 2022-03-3 IDA / 60880 Sanitation Development Post Open 4,244.12 Completed tivities with communities a ultant Selection 4 0 2 8 3 9 7 1 8 1 nd householders in Koo Ch aty subproject IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-05-0 2021-04-0 2021-06-2 2021-05-2 2021-07-1 2021-06-0 2021-08-1 2021-06-1 2022-08-1 2021-12-3 20-27 / Field technical sup IDA / 60880 Water Supply Investments Post Open 7,241.60 Completed ultant Selection 4 5 2 7 3 9 7 4 7 1 ervision engineer Kyzyl Zh ar IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-05-0 2021-04-0 2021-06-2 2021-05-2 2021-07-1 2021-06-0 2021-08-1 2021-06-1 2022-08-1 2022-12-3 20-28 / Field technical sup IDA / 60880 Water Supply Investments Post Open 7,241.60 Completed ultant Selection 4 5 2 7 3 9 7 4 7 1 ervision engineer Koo Chat y IDA-SRWSSDP-IC-MWU-20 21 / Consultant on Perform Institutional Strengthenin Individual Cons 2021-06-2 2021-07-2 2021-07-2 2021-09-2 2021-08-0 2021-09-2 2021-08-1 2021-10-0 2024-02-0 ance Improvement of Wat IDA / D2040 Post Limited 2,546.46 Signed g ultant Selection 8 7 8 7 4 9 8 1 4 er Supply Utilities, Operati on and Maintenance of Rur al Water Supply Systems IDA-SRWSSDP-IC-2021-1 / Individual Cons 2021-08-0 2021-09-1 2021-10-1 2021-11-1 2022-11-1 IDA / D1380 Water Supply Investments Post Open 0.00 Canceled Infrastructure engineer ass ultant Selection 1 9 0 4 4 istant IDA-SRWSSDP-AF-IC-FSS-2 020-15-1 / Consultants on Individual Cons 2021-03-2 2021-03-2 2021-05-1 2021-05-2 2021-05-3 2021-06-2 2021-07-0 2021-07-1 2022-04-0 2022-01-1 activities with communitie IDA / 60880 Sanitation Development Post Open 2,829.28 Completed ultant Selection 9 9 0 4 1 2 5 5 1 7 s and householders in Gor naya Maevka subproject (s econd) IDA-SRWSSDP-AF-IC-FSS-2 021-23-1 / Consultants on Individual Cons 2021-03-2 2021-03-2 2021-05-1 2021-04-2 2021-05-3 2021-04-2 2021-07-0 2021-05-1 2022-04-0 2022-02-1 IDA / 60880 Sanitation Development Post Open 4,244.05 Completed activities with communitie ultant Selection 9 4 0 7 1 8 5 4 1 7 s and householders in Ken Bulun subproject (second) IDA-SRWSSDP-AF-IC-FSS-2 021-5-1 / Consultants on a Individual Cons 2021-03-2 2021-03-2 2021-05-1 2021-05-2 2021-05-3 2021-06-0 2021-07-0 2021-06-2 2022-04-0 2022-03-1 ctivities with communities IDA / 60880 Sanitation Development Post Open 4,158.19 Completed ultant Selection 9 3 0 0 1 2 5 1 1 6 and householders in Ivano vka Station subproject (se cond) IDA-SRWSSDP-AF-IC-FIDS- 2020-14-1 / Local expert o Institutional Strengthenin Individual Cons 2021-03-2 2021-03-0 2021-05-1 2021-05-2 2021-05-3 2021-06-2 2021-07-0 2021-07-0 2022-06-3 2023-12-3 n social mobilization and i IDA / 60880 Post Open 5,658.56 Completed g ultant Selection 9 2 0 0 1 2 5 1 0 1 nstitutional development i n Gornaya Maevka subproj ect (second) IDA-SRWSSDP-AF-IC-IVA-2 021-2 / Independent Verifi Individual Cons 2021-11-0 2021-11-0 2021-12-2 2022-01-2 2022-01-1 2022-03-0 2022-02-1 2022-03-1 2022-08-1 2022-04-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed cation Agent (IVA) for Hou ultant Selection 2 3 1 0 1 1 5 0 4 0 sehold Sanitation Facilities in Chuy oblast IDA-SRWSSDP-AF-IC-IVA-2 021-3 / Independent Verifi Individual Cons 2021-11-0 2021-11-0 2021-12-2 2022-01-1 2022-02-1 2022-08-1 IDA / 60880 Sanitation Development Post Open 0.00 Canceled cation Agent (IVA) for Hou ultant Selection 2 3 1 1 5 4 sehold Sanitation Facilities in Issyk-Kul oblast IDA-SRWSSDP-AF-IC-IVA-2 021-1 / Independent Verifi Individual Cons 2021-11-0 2021-11-0 2021-12-2 2022-01-2 2022-01-1 2022-03-0 2022-02-1 2022-03-1 2022-08-1 2022-03-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed cation Agent (IVA) for Hou ultant Selection 3 3 2 0 2 1 6 0 5 0 sehold Sanitation Facilities in Osh oblast IDA-SRWSSDP-AF-IC-TS-20 21-5-1 / Field technical sup Individual Cons 2021-11-0 2021-03-2 2021-12-2 2021-07-2 2022-01-1 2021-08-1 2022-02-1 2021-10-0 2023-02-1 2023-04-3 IDA / 60880 Water Supply Investments Post Open 6,153.69 Completed ervision engineer in Ivanov ultant Selection 3 9 2 6 2 7 6 1 6 0 ka station Chui oblast (sec ond) IDA-SRWSSDP-IC-2021-2 / Institutional Strengthenin Individual Cons 2021-11-2 2021-11-2 2022-01-1 2022-01-2 2022-02-0 2022-01-2 2022-03-0 2022-01-2 2024-12-3 Senior Field Specialist for I IDA / 59070 Post Open 2,829.28 Terminated g ultant Selection 4 6 2 0 2 6 9 8 1 nstitutional Development i n Osh oblast IDA-SRWSSDP-IC-2021-3 / Institutional Strengthenin Individual Cons 2021-11-2 2021-11-2 2022-01-1 2022-01-1 2022-02-0 2022-01-2 2022-03-0 2022-01-2 2024-12-3 Senior Field Specialist for I IDA / 59070 Post Open 2,829.28 Signed g ultant Selection 4 6 2 8 2 6 9 8 1 nstitutional Development i n Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-12-0 2022-02-2 2022-01-1 2022-02-0 2022-03-1 2023-03-1 21-23-RT-1 / Field technica IDA / 60880 Water Supply Investments Post Open 0.00 Canceled ultant Selection 1 4 9 9 6 6 l supervision engineer in K en-Bulun Chui oblast IDA-SRWSSDP-AF-IC-TRNG -2022-1 / Consultant for tr Institutional Strengthenin Individual Cons 2022-02-1 2022-03-0 2022-04-0 2022-05-2 2022-04-2 2022-05-2 2022-06-0 2022-05-2 2022-11-2 2023-06-3 aining of local self-governa IDA / 60880 Post Open 4,081.37 Completed g ultant Selection 7 7 7 3 8 3 2 4 9 0 nce bodies, CDWUU and ot her rural water supply utili ties #1 IDA-SRWSSDP-AF-IC-TRNG -2022-2 / Consultant for tr Institutional Strengthenin Individual Cons 2022-02-1 2022-03-0 2022-04-0 2022-05-2 2022-04-2 2022-05-2 2022-06-0 2022-05-2 2022-11-2 2023-01-1 aining of local self-governa IDA / 60880 Post Open 4,081.37 Signed g ultant Selection 7 7 7 3 8 3 2 4 9 3 nce bodies, CDWUU and ot her rural water supply utili ties #2 IDA-SRWSSDP-AF-IC-TRNG -2022-3 / Consultant for tr Institutional Strengthenin Individual Cons 2022-02-1 2022-03-0 2022-04-0 2022-05-2 2022-04-2 2022-05-2 2022-06-0 2022-05-2 2022-11-2 aining of local self-governa IDA / 60880 Post Open 4,081.37 Signed g ultant Selection 7 7 7 3 8 3 2 4 9 nce bodies, CDWUU and ot her rural water supply utili ties #3 IDA-SRWSSDP-AF-IC-TRNG -2022-4 / Consultant for tr Institutional Strengthenin Individual Cons 2022-02-1 2022-03-0 2022-04-0 2022-05-2 2022-04-2 2022-05-2 2022-06-0 2022-05-2 2022-11-2 2024-06-3 aining of local self-governa IDA / 60880 Post Open 4,081.37 Completed g ultant Selection 7 7 7 3 8 3 2 4 9 0 nce bodies, CDWUU and ot her rural water supply utili ties #4 IDA-SRWSSDP-AF-IC-TRNG -2022-5 / Consultant for tr Institutional Strengthenin Individual Cons 2022-02-1 2022-03-0 2022-04-0 2022-05-2 2022-04-2 2022-05-2 2022-06-0 2022-05-2 2022-11-2 2023-01-1 aining of local self-governa IDA / 60880 Post Open 4,081.37 Signed g ultant Selection 7 7 7 3 8 3 2 4 9 3 nce bodies, CDWUU and ot her rural water supply utili ties #5 IDA-SRWSSDP-AF-IC-FIDS- 2020-8-RT1 / Local expert Institutional Strengthenin Individual Cons 2022-02-2 2021-03-0 2022-04-1 2021-04-1 2022-05-0 2021-04-1 2022-06-0 2021-04-1 2023-06-0 2022-06-3 IDA / 60880 Post Open 6,812.33 Completed on social mobilization and g ultant Selection 4 3 4 6 5 6 9 9 9 0 institutional development i n Chon-Daly subproject IDA-SRWSSDP-AF-CS-SSS- 2021-10 / Consultant for s 2021-07-1 2021-07-2 2021-07-2 2021-07-2 2021-08-0 2021-08-0 2021-12-3 2021-12-3 urvey, preparation of BoQ IDA / D2040 Sanitation Development Post Direct Selection Direct 0.00 Completed 2 0 2 9 2 2 1 1 and drawings for rehabilita tion of indoor sanitary facil ities in schools of Chaichi s ubproject IDA-SRWSSDP-IC-TRNG-20 22-1 / Trainer on conductin Individual Cons 2022-03-1 2022-03-1 2022-05-0 2022-05-2 2022-05-2 2022-05-2 2022-06-2 2022-05-2 2023-06-2 IDA / D1380 Sanitation Development Post Open 2,577.57 Signed g trainings for sanitation fi ultant Selection 4 0 2 3 3 3 7 4 7 eld officers on WASH in Sc hools Methodology IDA-SRWSSDP-IC-TRNG-20 22-2 / Trainer on conductin Individual Cons 2022-03-1 2022-03-1 2022-03-1 2022-05-2 2022-04-0 2022-05-2 2022-05-1 2022-05-2 2023-05-1 g trainings for sanitation fi IDA / D1380 Sanitation Development Post Limited 0.00 Signed ultant Selection 4 0 9 3 9 3 4 4 4 eld officers on Household Sanitation Improvement M ethodology IDA-SRWSSDP-IC-2021-2- Institutional Strengthenin Individual Cons 2022-03-1 2022-03-2 2022-03-1 2022-01-1 2022-04-0 2022-03-2 2022-05-1 2022-04-0 2023-05-1 RT-1 / Senior Field Speciali IDA / D2040 Post Limited 0.00 Signed g ultant Selection 4 3 9 8 9 8 4 1 4 st for Institutional Develop ment in Osh oblast IDA-SRWSSDP-AF-DS-EIA- 2022 / Consultant for Engi neering, Environmental an 2022-03-2 2022-03-2 2022-03-2 2022-04-0 2022-04-0 2022-04-0 2022-06-1 2022-06-3 d Sanitary Safety Review i IDA / D2040 Water Supply Investments Post Direct Selection Direct 3,731.78 Completed 5 3 7 5 1 6 0 0 n Subprojects Ivanovka St ation, Kara-Zhygach, Ken- Bulun, Sosnovka, Komsom ol’skoe, Kurmontu, Bokso- Zhol, Kayirma IDA-SRWSSDP-AF-IC-2022 Individual Cons 2022-04-2 2022-06-0 2022-06-2 2022-08-0 2023-08-0 -1 / Supervision Engineer/ IDA / 59070 Water Supply Investments Post Open 0.00 Canceled ultant Selection 0 8 9 3 3 Hydrogeologist in Osh obla st IDA-SRWSSDP-AF-IC-2022 Individual Cons 2022-04-2 2022-06-2 2022-06-0 2022-06-2 2022-06-2 2022-06-3 2022-08-0 2022-07-0 2023-08-0 2022-09-3 -2 / Supervision Engineer/ IDA / 59070 Water Supply Investments Post Open 0.00 Completed ultant Selection 0 9 8 9 9 0 3 1 3 0 Hydrogeologist in Chui and Issyk kul oblast IDA-SRWSSDP-AF-IC-2022 Individual Cons 2022-05-1 2022-04-1 2022-06-2 2022-05-3 2022-07-1 2022-05-3 2022-08-2 2022-06-0 2024-08-2 -5 / Sanitation Subsidy Con IDA / D2040 Sanitation Development Post Open 0.00 Signed ultant Selection 0 8 8 1 9 1 3 7 2 sultant of Chui oblast IDA-SRWSSDP-AF-IC-2022 Individual Cons 2022-05-1 2022-04-2 2022-06-2 2022-06-0 2022-07-1 2022-06-0 2022-08-2 2022-06-0 2024-08-2 -6 / Sanitation Subsidy Con IDA / D2040 Sanitation Development Post Open 3,360.56 Signed ultant Selection 0 6 8 6 9 6 3 7 2 sultant of Issyk-Kul oblast IDA-SRWSSDP-AF-IC-2022 Individual Cons 2022-05-1 2022-05-3 2022-06-2 2022-05-2 2022-07-1 2022-06-1 2022-08-2 2022-06-1 2024-08-2 2024-06-3 IDA / D2040 Sanitation Development Post Open 0.00 Completed -7 / Sanitation Subsidy Con ultant Selection 0 0 8 7 9 7 3 7 2 0 sultant of Osh IDA-SRWSSDP-AF-IC-2022 Individual Cons 2022-05-1 2022-04-2 2022-06-2 2022-05-3 2022-07-1 2022-05-3 2022-08-2 2022-06-0 2024-08-2 IDA / D2040 Sanitation Development Post Open 6,805.14 Signed -4 / Sanitation Engineer ultant Selection 0 7 8 0 9 0 3 7 2 IDA-SRWSSDP-AF-IC-2022 Individual Cons 2022-05-1 2022-04-2 2022-06-2 2022-07-2 2022-07-1 2022-08-0 2022-08-2 2022-08-0 2024-08-2 2024-06-3 IDA / D2040 Sanitation Development Post Open 1,494.00 Completed -3 / Public Relations Specia ultant Selection 0 6 8 5 9 1 3 1 2 0 list IDA-SRWSSDP-AF-IC-FIDS- 2022-1-RT-1 / Local expert Institutional Strengthenin Individual Cons 2022-07-0 2022-06-1 2022-08-1 2022-07-2 2022-09-0 2022-08-0 2022-10-0 2022-08-0 2023-04-0 2023-06-3 on social mobilization and IDA / 60880 Post Open 2,490.01 Completed g ultant Selection 1 7 9 5 2 1 7 1 5 0 institutional development i n Kenesh and Chon Daly s ubproject IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2022-07-0 2022-06-2 2022-08-1 2022-07-2 2022-09-0 2022-07-2 2022-10-1 2022-08-0 2023-04-1 2023-06-3 21-4-1 / Junior field technic IDA / 60880 Water Supply Investments Post Open 0.00 Completed ultant Selection 1 3 9 5 9 7 4 1 2 0 al supervision for Sosnovk a subproject IDA-SRWSSDP-AF-IC-FSS-2 021-4-1 / Consultants on a Individual Cons 2022-06-0 2022-06-1 2022-07-2 2022-04-2 2022-08-1 2022-04-2 2022-09-1 2022-04-2 2023-06-1 2023-03-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed ctivities with communities ultant Selection 3 7 2 0 2 5 6 8 7 1 and householders in Sosno vka subproject IDA-SRWSSDP-СS-SSS-202 2022-06-0 2022-05-1 2022-06-1 2022-05-2 2022-08-1 2022-05-3 2023-08-1 2-3 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct 0.00 Signed 2 0 2 3 6 0 6 r 4 WSS sub-projects in Ch ui oblast ARIS-IDA-SRWSSDP-HO-20 Individual Cons 2022-07-0 2022-06-2 2022-08-1 2022-08-0 2022-09-0 2022-08-1 2022-10-1 2022-08-1 2023-04-1 IDA / D1380 Water Supply Investments Post Open 0.00 Signed 22-1 / Assistant of safegua ultant Selection 1 4 9 8 9 5 4 5 2 rds specialist IDA-SRWSSDP-AF-IC-IVA-2 022-1 / Independent Verifi Individual Cons 2023-01-0 2023-08-0 2023-02-1 2023-09-0 2023-03-1 2023-10-0 2023-04-1 2023-10-1 2023-12-2 IDA / D2040 Sanitation Development Post Open - National 0.00 Terminated cation Agent (IVA) for Hou ultant Selection 1 3 9 1 2 5 6 3 2 sehold Sanitation Facilities in Chuy and Issyk-Kul obla sts. IDA-SRWSSDP-AF-IC-IVA-2 022-2 / Independent Verifi Individual Cons 2023-01-1 2023-08-0 2023-02-2 2023-03-2 2023-04-2 2023-12-3 IDA / D2040 Sanitation Development Post Open - National 0.00 Canceled cation Agent (IVA) for Hou ultant Selection 0 3 8 1 5 1 sehold Sanitation Facilities in Osh oblast IDA-SRWSSDP-AF-IC-ENG- 2022-1 / Consultant for pre Individual Cons 2023-01-1 2023-03-2 2023-02-2 2023-05-1 2023-03-2 2023-05-1 2023-04-2 2023-05-1 2023-12-3 2023-08-1 paration of BoQ and drawi IDA / D2040 Sanitation Development Post Open - National 0.00 Completed ultant Selection 0 9 8 0 1 9 5 9 1 8 ngs for rehabilitation of int ernal sanitary units and fa cilities of kindergartens in Osh region IDA-SRWSSDP-AF-IC-ENG- 2022-2 / Consultant for pre paration of BoQ and drawi Individual Cons 2023-01-1 2023-05-0 2023-02-2 2023-05-1 2023-03-2 2023-05-1 2023-04-2 2023-05-1 2023-12-3 2023-10-2 IDA / D2040 Sanitation Development Post Open - National 0.00 Completed ngs for rehabilitation of int ultant Selection 0 2 8 0 1 9 5 9 1 3 ernal sanitary units and fa cilities of kindergartens in Chui and Issyk-Kul region IDA-SRWSSDP-AF-IC-2023 Individual Cons 2023-04-0 2023-04-1 2023-05-2 2023-06-0 2023-06-1 2023-06-0 2023-07-2 2023-06-0 2024-01-1 2024-06-3 -1 / Consultant on sanitary IDA / D2040 Sanitation Development Post Open - National 0.00 Completed ultant Selection 6 2 5 1 5 7 0 7 6 0 subsidies for Osh region (E ngineer) Page 12 IDA-SRWSSDP-IC-2023-1 / Senior Field Specialist for I Institutional Strengthenin Individual Cons 2023-04-1 2023-04-1 2023-06-0 2023-06-0 2023-06-1 2023-06-0 2023-06-2 2023-06-0 2025-09-0 IDA / D2040 Post Open - National 0.00 Signed nstitutional Development i g ultant Selection 4 8 1 6 1 7 6 7 3 n Subprojects of Chui Obla st IDA-SRWSSDP-IC-2023-2 / Institutional Strengthenin Individual Cons 2023-04-1 2023-04-1 2023-05-2 2023-06-0 2023-06-0 2023-06-0 2023-06-2 2023-06-0 2025-08-3 IDA / D2040 Post Open - National 0.00 Signed Institutional Development g ultant Selection 1 8 9 6 8 7 3 7 1 Assistant IDA-SRWSSDP-AF-IC-TRNG Institutional Strengthenin Individual Cons 2023-06-0 2023-07-0 2023-07-0 2023-07-1 2024-07-0 -2023-1 / Treiner for Aiyl O IDA / 60880 Post Open - National 0.00 Canceled g ultant Selection 6 4 9 2 6 kmotu and CDWUUs (#19) IDA-SRWSSDP-AF-IC-TRNG Institutional Strengthenin Individual Cons 2023-06-0 2023-07-0 2023-07-1 2023-07-1 2024-07-0 -2023-2 / Treiner for Aiyl O IDA / 60880 Post Open - National 0.00 Canceled g ultant Selection 6 5 0 4 8 kmotu and CDWUUs (#20) IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-04-2 2023-04-2 2023-05-2 2023-05-1 2023-06-1 2023-05-1 2023-06-1 2023-05-1 2024-07-2 21-4/2 / Field technical sup IDA / 60880 Water Supply Investments Post Open - National 0.00 Signed ultant Selection 3 1 1 1 3 8 8 8 2 ervision engineer in Sosno vka Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-04-2 2023-05-2 2023-05-2 2023-05-2 2024-05-2 21-19/1 / Field technical su IDA / 60880 Water Supply Investments Post Open - National 0.00 Canceled ultant Selection 5 4 6 8 2 pervision engineer in Jyluu -Bulak Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-08-0 2023-07-1 2023-09-0 2023-09-1 2023-09-2 2025-02-0 23-1 / Field technical super IDA / 60880 Water Supply Investments Post Open - National 0.00 Canceled ultant Selection 6 0 4 0 6 7 vision engineer in Kichi-Bul olu Osh oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-12-1 2024-01-0 2024-01-1 2024-01-1 2025-06-0 23-2 / Field technical super IDA / 60880 Water Supply Investments Post Open - National 0.00 Canceled ultant Selection 1 9 1 9 2 vision engineer in Gulbaar Osh oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-12-1 2024-01-1 2024-01-1 2024-01-1 2025-05-3 23-3 / Field technical super IDA / 60880 Water Supply Investments Post Open - National 0.00 Canceled ultant Selection 1 0 4 6 0 vision engineer in Otuz-Ad yr Osh oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-12-1 2024-01-1 2024-01-1 2024-01-1 2025-05-2 23-4 / Field technical super IDA / 60880 Water Supply Investments Post Open - National 0.00 Canceled ultant Selection 1 0 2 5 9 vision engineer in Kum-Ary k Chui oblast IDA-SRWSSDP-AF-IC-TS-20 23-5 / Field technical super Individual Cons 2023-05-0 2023-04-2 2023-06-0 2023-06-0 2023-06-0 2023-06-0 2023-06-1 2023-06-0 2024-10-2 2023-12-3 IDA / 60880 Water Supply Investments Post Open - National 0.00 Completed vision engineer in Sultan f ultant Selection 5 5 8 1 9 2 2 2 4 1 or additional work Chui obl ast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-05-0 2023-05-1 2023-06-0 2023-06-0 2023-07-1 2024-11-2 23-6 / Junior field technical IDA / 60880 Water Supply Investments Post Open - National 0.00 Canceled ultant Selection 5 8 8 9 5 6 supervision for Kurpuldok subproject IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-05-0 2023-05-1 2023-06-0 2023-06-0 2023-07-0 2024-09-2 23-7 / Junior field technical IDA / 60880 Water Supply Investments Post Open - National 0.00 Canceled ultant Selection 5 8 8 9 2 4 supervision for Orto-Aryk s ubproject IDA-SRWSSDP-AF-IC-TS-20 Individual Cons Under Impleme 2023-12-1 2023-08-0 2024-01-1 2024-01-1 2024-02-0 2025-05-0 23-8 / Junior field technical IDA / 60880 Water Supply Investments Post Open - National 0.00 ultant Selection ntation 1 3 4 5 7 2 supervision for Kum-Aryk s ubproject IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-09-0 2023-08-0 2023-10-0 2023-12-0 2023-10-0 2023-12-0 2023-11-0 2023-12-2 2025-01-2 23-9 / Junior field technical IDA / 60880 Water Supply Investments Post Open - National 0.00 Signed ultant Selection 4 3 8 7 9 7 1 9 4 supervision for Bokso-Jol s ubproject IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-04-2 2023-05-2 2023-05-3 2023-06-2 2024-09-1 23-10 / Field technical sup IDA / 60880 Water Supply Investments Post Open - National 0.00 Canceled ultant Selection 5 9 0 2 4 ervision engineer in Kaiyr ma Chui oblast IDA-SRWSSDP-СS-DS-202 Under Impleme 2023-12-1 2024-11-1 2024-01-0 2024-01-1 2025-04-1 3-1 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct - National 0.00 ntation 2 8 1 6 0 r Gulbaar WSS sub-project s in Osh oblast IDA-SRWSSDP-СS-DS-202 2023-08-1 2024-04-2 2023-08-2 2023-05-0 2023-09-0 2024-05-0 2024-11-2 3-2 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct - National 0.00 Signed 1 3 1 8 5 8 8 r Kichi Bulolu WSS sub-proj ects in Osh oblast IDA-SRWSSDP-СS-DS-202 Under Impleme 2023-12-1 2024-11-1 2023-12-2 2024-01-1 2025-04-1 3-3 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct - National 0.00 ntation 2 9 7 6 7 r Otuz-Adyr WSS sub-proje cts in Osh oblast IDA-SRWSSDP-AF-IC-2-20 23-1 / Consultant on proje Individual Cons 2023-06-0 2023-06-2 2023-06-2 2023-07-0 2024-06-3 IDA / D2040 Sanitation Development Post Open - National 0.00 Canceled ct development and autho ultant Selection 6 6 8 6 0 r's supervision of subproje cts IDA-SRWSSDP-AF-IC-2-20 Individual Cons 2023-07-1 2024-04-0 2023-08-1 2024-05-2 2023-08-2 2024-05-2 2023-09-1 2024-05-3 2024-09-1 23-2 / Sanitation Subsidy C IDA / D2040 Sanitation Development Post Open - National 0.00 Signed ultant Selection 1 4 9 2 2 2 6 1 0 onsultant of Osh oblast # 2 IDA-SRWSSDP-AF-IC-FSS-2 -2023-1 / Consultant on ac Individual Cons 2023-09-0 2023-07-2 2023-10-1 2023-11-1 2023-10-1 2023-11-1 2023-10-2 2023-11-2 2024-10-1 tivities with communities a IDA / 60880 Sanitation Development Post Open - National 0.00 Signed ultant Selection 9 7 3 0 6 0 1 7 5 nd householders in subproj ect “Kurmontu” (Field sani tation officer) IDA-SRWSSDP-AF-IC-FSS-2 -2023-2 / Consultant on ac Individual Cons Pending Imple 2023-12-1 2024-01-1 2024-01-2 2024-01-2 2025-01-2 tivities with communities a IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection mentation 5 8 0 6 0 nd householders in subproj ect “Kum-Aryk” (Field sani tation officer) IDA-SRWSSDP-AF-IC-FSS-2 -2023-3 / Consultant on ac Individual Cons 2023-08-0 2023-07-2 2023-09-1 2023-12-0 2023-09-1 2023-12-1 2023-09-1 2023-12-2 2024-09-1 tivities with communities a IDA / 60880 Sanitation Development Post Open - National 0.00 Terminated ultant Selection 8 7 1 7 4 3 9 2 3 nd householders in subproj ect “Bokso-Jol” (Field sanit ation officer) IDA-SRWSSDP-AF-IC-FSS-2 -2023-4 / Consultant on ac Individual Cons 2023-09-0 2024-04-1 2023-10-1 2024-05-2 2023-10-1 2024-05-2 2023-10-1 2024-06-0 2024-10-1 tivities with communities a IDA / 60880 Sanitation Development Post Open - National 0.00 Signed ultant Selection 7 6 1 9 4 9 9 3 3 nd householders in subproj ect “Kichi-Oruktuu” (Field sanitation officer) IDA-SRWSSDP-AF-IC-FSS-2 -2023-5 / Consultant on ac Individual Cons Under Impleme 2023-09-0 2024-11-1 2023-10-1 2023-10-1 2023-10-2 2024-10-1 tivities with communities a IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 7 9 0 2 0 4 nd householders in subproj ect “Karool-Dobo” (Field s anitation officer) IDA-SRWSSDP-AF-IC-FSS-2 -2023-6 / Consultant on ac Individual Cons Under Impleme 2023-12-1 2024-09-0 2024-01-1 2024-09-2 2024-01-2 2024-12-0 2024-01-2 2025-01-2 tivities with communities a IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 5 5 8 4 1 6 8 2 nd householders in subproj ect “Gulbar” (Field sanitat ion officer) #1 IDA-SRWSSDP-AF-IC-FSS-2 -2023-7 / Consultant on ac Individual Cons Under Impleme 2023-12-1 2024-09-0 2024-01-1 2024-12-0 2024-01-2 2024-12-0 2024-02-1 2025-02-2 tivities with communities a IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 5 5 8 6 1 6 5 5 nd householders in subproj ect “Gulbar” (Field sanitat ion officer) #2 IDA-SRWSSDP-AF-IC-FSS-2 -2023-8 / Consultant on ac Individual Cons Under Impleme 2023-12-1 2024-09-0 2024-01-1 2024-12-0 2024-01-2 2024-12-0 2024-01-2 2025-01-2 tivities with communities a IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 5 5 8 6 1 6 8 2 nd householders in subproj ect “Gulbar” (Field sanitat ion officer) #3 IDA-SRWSSDP-AF-IC-FSS-2 -2023-9 / Consultant on ac Individual Cons Under Impleme 2023-12-1 2024-09-0 2024-01-1 2024-12-0 2024-01-2 2024-12-0 2024-02-1 2025-02-0 tivities with communities a IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 5 5 8 6 1 6 5 9 nd householders in subproj ect “Gulbar” (Field sanitat ion officer) #4 IDA-SRWSSDP-AF-IC-FSS-2 -2023-10 / Consultant on a Individual Cons Under Impleme 2023-12-1 2024-09-0 2024-01-1 2024-12-0 2024-01-2 2024-12-0 2024-02-1 2025-02-0 ctivities with communities IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 5 5 8 6 1 6 5 9 and householders in subpr oject “Gulbar” (Field sanit ation officer) #5 IDA-SRWSSDP-AF-IC-FSS-2 -2023-11 / Consultant on a Individual Cons Under Impleme 2023-12-1 2024-11-1 2024-01-1 2024-01-2 2024-02-1 2025-02-0 ctivities with communities IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 5 3 8 1 5 9 and householders in subpr oject “Otuz-Adyr” (Field s anitation officer) #1 IDA-SRWSSDP-AF-IC-FSS-2 -2023-12 / Consultant on a Individual Cons Under Impleme 2023-12-1 2024-11-1 2024-01-1 2024-01-2 2024-02-1 2025-02-0 ctivities with communities IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 5 3 8 1 5 9 and householders in subpr oject “Otuz-Adyr” (Field s anitation officer) #2 IDA-SRWSSDP-AF-IC-FSS-2 -2023-13 / Consultant on a Individual Cons Under Impleme 2023-12-1 2024-11-1 2024-01-1 2024-01-2 2024-02-1 2025-02-0 ctivities with communities IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 5 3 8 1 5 9 and householders in subpr oject “Otuz-Adyr” (Field s anitation officer) #3 IDA-SRWSSDP-AF-IC-FSS-2 -2023-14 / Consultant on a Individual Cons Under Impleme 2023-12-1 2024-11-1 2024-01-1 2024-01-2 2024-02-0 2025-02-0 ctivities with communities IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 5 3 8 0 8 2 and householders in subpr oject “Otuz-Adyr” (Field s anitation officer) #4 IDA-SRWSSDP-AF-IC-FSS-2 -2023-15 / Consultant on a Individual Cons Under Impleme 2023-12-1 2024-11-1 2024-01-1 2024-01-2 2024-02-1 2025-02-0 ctivities with communities IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 5 3 8 1 5 9 and householders in subpr oject “Otuz-Adyr” (Field s anitation officer) #5 IDA-SRWSSDP-AF-IC-2-20 23-4 / Individual consultan Individual Cons Pending Imple 2023-06-0 2023-07-1 2023-07-1 2023-07-2 2024-07-1 t to update drinking water IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection mentation 6 0 2 0 4 quality control software in support of the Department of SES. IDA-SRWSSDP-AF-IC-FSS-2 -2023-16 / Consultant on a Individual Cons 2023-05-1 2023-05-1 2023-06-2 2023-06-1 2023-07-1 2023-06-1 2023-08-2 2023-06-1 2024-05-2 2024-04-3 ctivities with communities IDA / 60880 Sanitation Development Post Open - National 0.00 Completed ultant Selection 0 5 8 2 9 9 3 9 3 0 and householders in subpr oject “Kyzyl-Bairak” of the Osh Oblast #2 IDA-SRWSSDP-AF-IC-FSS-2 -2023-17 / Consultant on a Individual Cons 2023-05-1 2023-05-1 2023-06-2 2023-06-1 2023-07-1 2023-06-2 2023-08-2 2023-06-2 2024-05-2 2023-12-3 ctivities with communities IDA / 60880 Sanitation Development Post Open - National 0.00 Completed ultant Selection 0 5 8 2 9 7 3 7 3 1 and householders in subpr oject “Toloikon” of the Osh Oblast #2 IDA-SRWSSDP-СS-DS-202 2023-06-1 2023-06-2 2023-06-2 2023-06-3 2023-07-0 2023-06-3 2024-09-2 3-4 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct - National 0.00 Signed 4 3 9 0 6 0 8 r Grigorevka WSS sub-proj ect in Issyk-Kul oblast IDA-SRWSSDP-СS-DS-202 3-5 / Author supervision fo Under Impleme 2023-09-0 2024-11-1 2023-09-1 2023-09-2 2024-12-1 IDA / 60880 Water Supply Investments Post Direct Selection Direct - National 0.00 r Karool-Dobo WSS sub-pro ntation 4 9 9 6 9 ject in Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 23-11 / Junior field technic Individual Cons 2023-07-2 2023-08-0 2023-08-2 2023-12-0 2023-08-2 2023-12-0 2023-09-0 2023-12-2 2024-08-2 IDA / 60880 Water Supply Investments Post Open - National 0.00 Signed al supervision for Kurmont ultant Selection 5 3 8 7 9 7 1 9 6 u subproject Issyk-Kul obla st IDA-SRWSSDP-СS-DS-202 Pending Imple 2023-09-0 2023-09-1 2023-09-2 2024-12-1 3-6 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct - National 0.00 mentation 4 9 6 9 r Kum-Aryk WSS sub-proje ct in Issyk-Kul oblast IDA-SRWSSDP-СS-DS-202 3-7 / Author supervision fo 2023-08-0 2023-08-1 2023-08-2 2024-11-1 IDA / 60880 Water Supply Investments Post Direct Selection Direct - National 0.00 Canceled r Kichi-Oruktu WSS sub-pro 4 9 6 8 ject in Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FSS-2 -2023-18 / Consultant on a ctivities with communities Individual Cons 2023-07-1 2023-07-2 2023-09-0 2023-11-1 2023-09-2 2023-11-1 2023-11-0 2023-11-2 2024-10-2 IDA / 60880 Sanitation Development Post Open - National 0.00 Signed and householders in subpr ultant Selection 9 7 6 0 7 0 1 7 6 oject “Grigorievka” of the I ssyk-Kul Oblast (Field sanit ation officer) IDA-SRWSSDP-AF-IC-FSS-2 -2023-19 / Consultant on a Individual Cons 2023-07-1 2023-07-2 2023-09-0 2023-11-1 2023-09-2 2023-12-2 2023-10-2 2023-12-2 2024-10-2 2024-06-3 ctivities with communities IDA / 60880 Sanitation Development Post Open - National 0.00 Completed ultant Selection 4 7 1 0 2 1 7 9 1 0 and householders in subpr oject “Kichi Bulolu” of the Osh Oblast (Field sanitatio n officer) IDA-SRWSSDP-AF-IC-FIDS- 2023-1 / Social Mobilizatio Institutional Strengthenin Individual Cons 2023-07-1 2023-09-0 2023-09-2 2023-11-0 2024-10-3 IDA / 60880 Post Open - National 0.00 Canceled n and Institutional Develop g ultant Selection 9 6 7 1 1 ment Specialist Subproject Kichi-Bulolu Osh oblast IDA-SRWSSDP-IC-2023-3 / Institutional Strengthenin Individual Cons 2023-07-1 2023-08-0 2023-09-0 2023-09-0 2023-09-2 2023-09-0 2023-11-0 2023-09-0 2024-10-2 IDA / 59070 Post Open - National 0.00 Signed Consultant for Automated g ultant Selection 9 4 6 1 7 1 1 1 6 Billing IDA-SRWSSDP-AF-IC-2023 Individual Cons 2023-07-2 2023-09-1 2023-08-1 2023-12-0 2023-08-2 2023-12-0 2023-08-2 2024-02-0 2024-08-2 IDA / 59070 Water Supply Investments Post Open - National 0.00 Signed -3 / Hydrogeologist (all on ultant Selection 0 4 8 7 3 7 7 1 6 needs basis) IDA-SRWSSDP-AF-IC-2023 Individual Cons 2023-07-2 2023-09-1 2023-08-1 2023-12-0 2023-08-2 2023-12-0 2023-08-2 2024-02-0 2024-08-2 IDA / 59070 Water Supply Investments Post Open - National 0.00 Signed -2 / Electrical (all on needs ultant Selection 0 4 8 7 3 7 7 1 6 basis) Page 13 IDA-SRWSSDP-СS-DS-202 3-8 / Adjustment of design 2023-08-1 2023-10-0 2023-08-2 2023-10-0 2023-10-0 2023-11-1 2023-12-0 IDA / 60880 Water Supply Investments Post Direct Selection Direct - National 0.00 Signed and estimate documentati 5 2 0 4 5 3 4 on for Karool-Dobo sub-pro ject IDA-SRWSSDP-AF-IC-TS-20 22-2-RT1 / Technical super Individual Cons 2023-08-2 2023-09-2 2023-10-0 2023-10-1 2024-03-1 IDA / 60880 Water Supply Investments Post Open - National 0.00 Canceled vision engineer for work in ultant Selection 5 8 3 1 9 the sub-project "Vinogradn oye" IDA-SRWSSDP-AF-IC-FSS-2 -2023-3/2 / Consultant on Individual Cons 2023-12-0 2023-12-0 2024-01-0 2024-04-0 2024-01-0 2024-04-0 2024-01-0 2024-04-1 2024-10-0 activities with communitie IDA / 60880 Sanitation Development Post Open - National 0.00 Signed ultant Selection 5 7 1 5 2 5 7 5 3 s and householders in sub project “Bokso-Jol” (Field sanitation officer)#2 IDA-SRWSSDP-AF-IC-FSS-2 -2023-1/2 / Consultant on Individual Cons 2023-12-0 2023-12-0 2024-01-0 2024-04-0 2024-01-0 2024-04-0 2024-01-1 2024-04-1 2024-10-0 activities with communitie IDA / 60880 Sanitation Development Post Open - National 0.00 Signed ultant Selection 5 7 1 5 6 5 2 5 8 s and householders in sub project “Kurmontu” (Field sanitation officer) #2 IDA-SRWSSDP-IC-2023-4 / Consultant lawyer on deve Institutional Strengthenin Individual Cons Pending Imple 2023-12-0 2024-01-0 2024-01-0 2024-01-0 2024-12-3 IDA / 60880 Post Open - National 0.00 lopment of normative legal g ultant Selection mentation 5 1 2 5 0 acts for drinking water sup ply and wastewater dispos al IDA-SRWSSDP-AF-IC-IVA-2 022-1/RT1 / Independent V Individual Cons 2023-12-0 2023-12-0 2024-01-0 2023-12-2 2024-01-2 2023-12-2 2024-02-0 2023-12-2 2024-12-3 erification Agent (IVA) for IDA / D2040 Sanitation Development Post Open - National 0.00 Signed ultant Selection 5 7 1 2 2 5 7 5 1 Household Sanitation Facili ties in Chuy and Issyk-Kul oblasts IDA-SRWSSDP-AF-IC-2022 Individual Cons 2024-03-1 2024-04-0 2024-04-1 2024-05-0 2024-04-1 2024-05-0 2024-04-1 2024-05-0 2024-12-3 IDA / D2040 Sanitation Development Post Open - National 0.00 Signed -3/RT1 / Public Relations S ultant Selection 1 8 4 8 6 8 8 8 1 pecialist IDA-SRWSSDP-IC-2020-3/ Institutional Strengthenin Individual Cons 2024-04-0 2024-10-0 2024-04-3 2024-11-1 2024-05-0 2024-11-1 2024-05-1 2024-11-2 2025-05-1 IDA / 60880 Post Open - National 0.00 Signed RT1 / Institutional specialis g ultant Selection 1 2 0 2 5 5 5 0 0 t IDA-SRWSSDP-AF-IC-2-20 24-1 / Consultant for Prepa ration of Bills of Quantities Individual Cons 2024-04-0 2024-04-0 2024-04-3 2024-05-2 2024-05-0 2024-05-2 2024-05-1 2024-06-0 2024-08-1 2024-09-0 IDA / 60880 Sanitation Development Post Open - National 0.00 Completed and Drawings by Technical ultant Selection 1 4 0 2 5 2 5 3 3 3 Investigation of Indoor San itation Facilities at Pilot Cli nics in Chui (part 2) and Is syk-Kul Oblasts IDA-SRWSSDP-AF-IC-2-20 24-2 / Consultant for Prepa ration of Bills of Quantities Individual Cons 2024-04-0 2024-04-0 2024-04-3 2024-05-2 2024-05-0 2024-05-2 2024-05-1 2024-06-0 2024-08-1 2024-09-0 IDA / 60880 Sanitation Development Post Open - National 0.00 Completed and Drawings by Technical ultant Selection 1 4 0 2 5 2 5 3 3 3 Investigation of Indoor San itation Facilities at Pilot Cli nics in Chui (part 1) and O sh Oblasts IDA-SRWSSDP-AF-IC-2-20 Individual Cons 2023-06-1 2024-04-0 2023-07-2 2024-05-2 2023-07-2 2024-05-2 2023-07-3 2024-05-3 2024-07-2 23-3 / Sanitation Subsidy C IDA / D2040 Sanitation Development Post Open - National 0.00 Signed ultant Selection 1 4 0 2 2 2 0 1 4 onsultant of Chui oblast # 2 IDA-SRWSSDP-AF-IC-2023 Individual Cons 2024-04-0 2024-04-0 2024-04-2 2024-05-2 2024-05-0 2024-05-2 2024-05-2 2024-06-0 2024-12-3 -1/RT1 / Consultant on sani IDA / D2040 Sanitation Development Post Open - National 0.00 Signed ultant Selection 5 4 5 2 9 2 4 3 1 tary subsidies for Osh regi on (Engineer) IDA-SRWSSDP-AF-IC-2022 Individual Cons Under Impleme 2024-07-2 2024-08-1 2024-09-1 2024-10-0 2024-11-0 2025-05-0 -7-1 / Sanitation Subsidy C IDA / D2040 Sanitation Development Post Open - National 0.00 ultant Selection ntation 6 4 3 4 8 7 onsultant of Osh oblast IDA-SRWSSDP-DS-TR-202 4-1 / Сonsulting services t Institutional Strengthenin 2024-07-3 2024-10-1 2024-08-1 2024-10-2 2024-10-1 2024-11-0 2025-03-1 IDA / 60880 Post Direct Selection Direct - National 0.00 Signed owards facilitation of upgr g 1 7 0 1 4 6 3 ading skills of water supply specialists/personnel IDA-SRWSSDP-AF-IC-2-20 24-3 / Independent Verific Individual Cons Under Impleme 2024-08-1 2024-09-0 2024-09-1 2024-11-1 2024-09-1 2024-11-1 2024-09-2 2024-12-3 IDA / 60880 Sanitation Development Post Open - National 0.00 ation Agent (IVA) for Hous ultant Selection ntation 5 9 3 8 8 8 8 1 ehold Sanitation Facilities i n Osh oblast IDA-SRWSSDP-AF-IC-FSS-2 -2023-3/1 / Consultant on Individual Cons Under Impleme 2024-08-1 2024-09-0 2024-09-1 2024-09-1 2024-09-2 2024-12-3 activities with communitie IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 5 9 3 8 8 1 s and householders in sub project “Bokso-Jol” (Field sanitation officer) IDA-SRWSSDP-AF-IC-FIDS- 2024-1 / Social Mobilizatio Individual Cons Under Impleme 2024-09-1 2024-10-1 2024-10-1 2024-10-2 2024-11-0 2025-10-3 n and Institutional Develop IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 3 5 4 8 4 0 ment Specialist Subproject Gulbar, Aravan rayon, Osh oblast #1 IDA-SRWSSDP-AF-IC-FIDS- 2024-2 / Social Mobilizatio Individual Cons Under Impleme 2024-09-1 2024-10-1 2024-10-1 2024-10-2 2024-11-0 2025-10-3 n and Institutional Develop IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 3 5 4 8 4 0 ment Specialist Subproject Gulbar, Aravan rayon, Osh oblast #2 IDA-SRWSSDP-AF-IC-FIDS- 2024-3 / Social Mobilizatio Individual Cons Under Impleme 2024-09-1 2024-10-1 2024-10-1 2024-10-2 2024-11-0 2025-10-3 n and Institutional Develop IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 3 5 4 8 4 0 ment Specialist Subproject Gulbar, Aravan rayon, Osh oblast #3 IDA-SRWSSDP-AF-IC-FIDS- 2024-4 / Social Mobilizatio Individual Cons Under Impleme 2024-09-2 2024-11-0 2024-10-2 2024-11-0 2024-11-1 2025-11-0 n and Institutional Develop IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 3 4 4 7 4 9 ment Specialist Subproject Otuz-Adyr, Kara-Suu rayon , Osh oblast #1 IDA-SRWSSDP-AF-IC-FIDS- 2024-5 / Social Mobilizatio Individual Cons Under Impleme 2024-09-2 2024-11-0 2024-10-2 2024-11-0 2024-11-1 2025-11-0 n and Institutional Develop IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 3 4 4 7 4 9 ment Specialist Subproject Otuz-Adyr, Kara-Suu rayon , Osh oblast #2 IDA-SRWSSDP-AF-IC-FIDS- 2024-6 / Social Mobilizatio Individual Cons Under Impleme 2024-09-2 2024-11-0 2024-10-2 2024-11-0 2024-11-1 2025-11-0 n and Institutional Develop IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 3 4 4 7 4 9 ment Specialist Subproject Otuz-Adyr, Kara-Suu rayon , Osh oblast #3 IDA-SRWSSDP-AF-IC-FIDS- 2024-7 / Social Mobilizatio Individual Cons Under Impleme 2024-09-2 2024-11-0 2024-10-2 2024-11-0 2024-11-1 2025-11-0 n and Institutional Develop IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 3 4 4 7 4 9 ment Specialist Subproject Otuz-Adyr, Kara-Suu rayon , Osh oblast #4 IDA-SRWSSDP-AF-IC-FIDS- 2024-8 / Social Mobilizatio Individual Cons Under Impleme 2024-09-2 2024-11-0 2024-10-2 2024-11-0 2024-11-1 2025-11-0 n and Institutional Develop IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 3 4 4 7 4 9 ment Specialist Subproject Otuz-Adyr, Kara-Suu rayon , Osh oblast #5 IDA-SRWSSDP-AF-IC-FIDS- 2022-4 / Local expert on s Institutional Strengthenin Individual Cons Pending Imple 2025-03-0 2025-04-1 2025-04-2 2025-05-0 2026-05-0 IDA / 60880 Post Open - National 0.00 ocial mobilization and insti g ultant Selection mentation 1 9 4 1 1 tutional development in Ku m-Aryk Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-21 / Local expert on Institutional Strengthenin Individual Cons 2024-12-2 2025-01-0 2025-02-1 2025-03-0 2025-04-0 2025-10-0 IDA / 60880 Post Open - National 0.00 Under Review social mobilization and inst g ultant Selection 4 9 1 4 8 5 itutional development in K arool-Dobo Issyk-Kul oblas t IDA-SRWSSDP-AF-IC-1-20 Individual Cons Pending Imple 2025-01-1 2025-02-1 2025-02-2 2025-02-2 2026-06-3 IDA / D1380 Water Supply Investments Post Open - National 0.00 25-1 / Assistant Infrastruct ultant Selection mentation 5 7 2 4 0 ure Engineer IDA-SRWSSDP-AF-IC-1-20 Individual Cons Pending Imple 2025-01-1 2025-02-1 2025-02-2 2025-02-2 2026-06-3 IDA / D1380 Water Supply Investments Post Open - National 0.00 25-2 / Assistant Infrastruct ultant Selection mentation 5 7 2 4 0 ure Engineer IDA-SRWSSDP-AF-IC-2022 Individual Cons Pending Imple 2025-01-1 2025-02-1 2025-02-2 2025-02-2 2026-06-3 IDA / D2040 Sanitation Development Post Open - National 0.00 -4-1 / Sanitation Engineer ultant Selection mentation 5 7 2 4 0 IDA-SRWSSDP-IC-2023-2- Institutional Strengthenin Individual Cons Pending Imple 2025-01-1 2025-02-1 2025-02-2 2025-02-2 2026-06-3 IDA / D2040 Post Open - National 0.00 1 / Institutional Developme g ultant Selection mentation 5 7 2 4 0 nt Assistant IDA-SRWSSDP-IC-3-2025- 1 / Consultant for institutio Institutional Strengthenin Individual Cons Pending Imple 2025-01-1 2025-02-1 2025-02-2 2025-02-2 2026-06-3 IDA / D2040 Post Open - National 0.00 nal capacity development g ultant Selection mentation 5 7 2 4 0 and educational programs in drinking water supply se ctor Page 14