The World Bank Implementation Status & Results Report Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2) (P180085) Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2) (P180085) WESTERN AND CENTRAL AFRICA | Western and Central Africa | IBRD/IDA | Investment Project Financing (IPF) | FY 2024 | Seq No: 3 | Archived on 27-Jan-2025 | ISR02697 Implementing Agencies: Ministere de l'Economie et des Participations, Ministere du Plan, de la Statistique et de l'Integration Regionale 1. OBJECTIVE 1.1 Development Objective Original Development Objective (Approved as part of Approval package on 28-Sep-2023) The Project Development Objective is to improve country statistical performance, regional harmonization, data access and use, and to enhance modernization of the statistical system in participating countries. Has the Development Objective been changed since Board Approval of the Project Objective? No 2. COMPONENTS Name Component 1: Harmonization and Production of Core Statistics using International Data Quality Standards:(Cost 274,400,000.00) Component 2: Statistical Modernization, Institutional Reform, Human Capital, Data Accessibility and Use:(Cost 50,700,000.00) Component 3: Construction, Upgrading and Modernization of Physical Infrastructure:(Cost 88,600,000.00) Component 4: Project Management, Monitoring, and Evaluation:(Cost 26,300,000.00) 3. OVERALL RATINGS Name Previous Current Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Jan 27, 2025 Page 1 of 16 The World Bank Implementation Status & Results Report Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2) (P180085) Overall Risk Rating Substantial Substantial 4. KEY ISSUES & STATUS 4.1 Implementation Status and Key Decisions This Implementation Status and Results Report is based on face-to-face implementation support missions that were conducted in the respective project participating countries and regional organization during December 2024. Central African Republic: Progress has been made in the implementation of the two main activities that were planned for 2024, these include the fourth population census , scheduled for in May 2025, and the constructing the Central African Institute for Statistics and Economic and Social Studies (Institut Centrafricain des Statistiques et des Etudes Economiques et Sociales, ICASEES) office building. Chad: Some of the project development indicators have improved including for example, number of staffs trained; number of scholarships provided, and the preparation of a gender note that includes many United Nations gender Statistics indicators. All Project Implementation Unit (PIU) staff are now recruited and in place. Thanks to a good monitoring system, the implementation of activities is underway. Thus, progress towards the project development objectives remains satisfactory. Central African Economic and Monetary Community (Communauté Économique et Monétaire de l'Afrique Centrale, CEMAC) : The project is effective for CEMAC and Key PIU staff are already hired with the remaining ones expected to be hired in the beginning of 2025. Activities under 2025 have already been planned and Regional harmonization activities have already started on the households living conditions harmonized Surveys (Enquête Harmonisée sur le Conditions de Vie des Ménages, EHCVM). The CEMAC commission has partnered with the West African Economic and Monetary Union (WAEMU) to organize two workshops with the participation of all the CEMAC countries including Equatorial Guinea. Cameroon: The project is not yet effective. Republic of Congo: The project is not yet effective. Gabonese Republic: The PIU team is in place and the recruitment of E&S specialists and M&E specialists are ongoing. The team is working closely with the statistical office (Direction Generale de la Statistique - DGS) to finalize the annual work plan for 2025. Jan 27, 2025 Page 2 of 16 The World Bank Implementation Status & Results Report Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2) (P180085) 5. SYSTEMATIC OPERATIONS RISK-RATING TOOL Rating at Approval Last Approved Rating Risk Category Approval Package - ISR Seq. 02 - 28 Jun Proposed Rating 28 Sep 2023 2024 Political and Governance High High High Macroeconomic Low Low Low Sector Strategies and Policies Low Low Low Technical Design of Project or Program Substantial Substantial Substantial Institutional Capacity for Implementation and Substantial Substantial Substantial Sustainability Fiduciary Substantial Substantial Substantial Environment and Social Moderate Moderate Moderate Stakeholders Low Low Low Overall Substantial Substantial Substantial Jan 27, 2025 Page 3 of 16 The World Bank Implementation Status & Results Report Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2) (P180085) 6. RESULTS 6.1 PDO Indicators by PDO Outcomes Improved stat. perf. indic. of partic. countries tailored on variables the project will influence Baseline Actual (Previous) Actual (Current) Closing Period Indicator Name Value Month/Year Value Date Value Date Value Month/Year Increase in statistical 39.08 Jul/2023 39.08 30-Jan-2024 39.08 16-Dec-2024 59.92 Dec/2029 performance indicators of Comments on The project has started preparatory activities in CAR, Chad and Gabon that will impact the project participating achieving targets SPI value going forward countries tailored on variables the project will influence. (Percentage) 49.70 Jul/2023 49.70 30-Jan-2024 49.70 16-Dec-2024 72.30 Dec/2029 Cameroon Comments on The project is not yet effective (Percentage) achieving targets 31.90 Jul/2023 31.90 30-Jan-2024 31.90 16-Dec-2024 52.80 Dec/2029 Central African Comments on Only preparatory activities has started that will impact the SPI going forward Republic (Percentage) achieving targets 44.20 Jul/2023 44.20 30-Jan-2024 44.20 16-Dec-2024 64.00 Dec/2029 Chad (Percentage) Comments on Only preparatory activities has started that will impact the SPI going forward achieving targets 29.80 Jan/2024 29.80 01-Feb-2024 29.80 16-Dec-2024 50.48 Dec/2029 Gabon (Percentage) Comments on No project activities have started yet. achieving targets 39.80 Jan/2024 39.80 01-Feb-2024 39.80 16-Dec-2024 60 Dec/2029 Jan 27, 2025 Page 4 of 16 The World Bank Implementation Status & Results Report Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2) (P180085) Republic of Congo Comments on The project is not yet effective (Percentage) achieving targets Improved quality of data access and use Baseline Actual (Previous) Actual (Current) Closing Period Indicator Name Value Month/Year Value Date Value Date Value Month/Year Increase in users who are 0.00 Jul/2023 0.00 01-Feb-2024 0.00 16-Dec-2024 10.00 Dec/2029 satisfied with the accessibility of statistical products as determined by the user satisfaction survey (percentage) - disaggregated by participating countries. (Percentage) Gabon (Percentage) 0.00 Jan/2024 0.00 01-Feb-2024 0.00 16-Dec-2024 10.00 Dec/2029 Republic of Congo 0.00 Jan/2024 0.00 01-Feb-2024 0.00 16-Dec-2024 10 Dec/2029 (Percentage) Cameroon 0.00 Jul/2023 0.00 01-Feb-2024 0.00 16-Dec-2024 10.00 Dec/2029 (Percentage) Central African 0.00 Jul/2023 0.00 01-Feb-2024 0.00 16-Dec-2024 10.00 Dec/2029 Republic (Percentage) Chad (Percentage) 0.00 Jul/2023 0.00 01-Feb-2024 0.00 16-Dec-2024 10.00 Dec/2029 Reports produced using 0.00 Jul/2023 0.00 01-Feb-2024 0.00 16-Dec-2024 10.00 Dec/2029 statistics/datasets/indicators Comments on To date only preparatory works have started in participating countries. supported by the project and achieving targets new data sources (Number) Gabon (Number) 0 Jan/2024 0.00 01-Feb-2024 0.00 16-Dec-2024 2 Dec/2029 Republic of Congo 0 Jan/2024 0.00 01-Feb-2024 0.00 16-Dec-2024 2 Dec/2029 (Number) Cameroon (Number) 0.00 Jul/2023 0.00 01-Feb-2024 0.00 16-Dec-2024 2.00 Dec/2029 Jan 27, 2025 Page 5 of 16 The World Bank Implementation Status & Results Report Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2) (P180085) Central African 0.00 Apr/2023 0.00 01-Feb-2024 0.00 16-Dec-2024 2.00 Dec/2029 Republic (Number) Chad (Number) 0.00 Jul/2023 0.00 01-Feb-2024 0.00 16-Dec-2024 2.00 Jun/2029 Improved regional harmonization and comparability of core statistics Baseline Actual (Previous) Actual (Current) Closing Period Indicator Name Value Month/Year Value Date Value Date Value Month/Year Harmonized core economic 0.00 Jul/2023 0 01-Feb-2024 0 16-Dec-2024 15.00 Dec/2029 and social statistics produced Comments on Under the lead of the CEMAC commission, participating countries are preparing the according to the applicable achieving targets household living standard harmonized survey. regional standards and made publicly available on national or regional websites (Number) Gabon (Number) 0 Jan/2024 0 01-Feb-2024 0 16-Dec-2024 3 Dec/2029 Republic of Congo 0 Jan/2024 0 01-Feb-2024 0 16-Dec-2024 3 Dec/2029 (Number) Cameroon (Number) 0.00 Jul/2023 0 01-Feb-2024 0 16-Dec-2024 3.00 Dec/2029 Central African 0.00 Jul/2023 0 01-Feb-2024 0 16-Dec-2024 3.00 Dec/2029 Republic (Number) Chad (Number) 0.00 Jul/2023 0 01-Feb-2024 0 16-Dec-2024 3.00 Dec/2029 Enhanced modernization of national statistical systems (NSSs) Baseline Actual (Previous) Actual (Current) Closing Period Indicator Name Value Month/Year Value Date Value Date Value Month/Year New statistical products 0.00 Jul/2023 0.00 01-Feb-2024 0.00 16-Dec-2024 10.00 Dec/2029 produced through the project Comments on This refers two new statistical products produced by each participating country through financing using improved achieving targets project financing and using new technologies such as CAPI data collection and computerized data checking methods (Number) Jan 27, 2025 Page 6 of 16 The World Bank Implementation Status & Results Report Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2) (P180085) Gabon (Number) 0 Jan/2024 0.00 01-Feb-2024 0.00 16-Dec-2024 2 Dec/2029 Republic of Congo 0 Jan/2024 0.00 01-Feb-2024 0.00 16-Dec-2024 2 Dec/2029 (Number) Cameroon (Number) 0.00 Jul/2023 0.00 01-Feb-2024 0.00 16-Dec-2024 2.00 Dec/2029 Central African 0.00 Jul/2023 0.00 01-Feb-2024 0.00 16-Dec-2024 2.00 Dec/2029 Republic (Number) Chad (Number) 0.00 Jul/2023 0.00 01-Feb-2024 0.00 16-Dec-2024 2.00 Dec/2029 6.2 Intermediate Results Indicators by Components Component 1: Harmonization and Production of Core Statistics using International Data Quality Standards Baseline Actual (Previous) Actual (Current) Closing Period Indicator Name Value Month/Year Value Date Value Date Value Month/Year Regional harmonization 1.00 Jul/2023 1.00 15-Dec-2023 1.00 16-Dec-2024 4.00 Dec/2029 manuals for CPI, National Accounts, Poverty survey, and other statistics produced by CEMAC (Number) New statistical products 0.00 Jul/2023 0 01-Feb-2024 0 16-Dec-2024 25.00 Dec/2029 produced using surveys aligned with CEMAC harmonization manual and other new data sources (Number) Gabon (Number) 0 Jan/2024 0 01-Feb-2024 0 16-Dec-2024 5 Dec/2029 Republic of Congo 0 Jan/2024 0 01-Feb-2024 0 16-Dec-2024 5 Dec/2029 (Number) Jan 27, 2025 Page 7 of 16 The World Bank Implementation Status & Results Report Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2) (P180085) Cameroon (Number) 0.00 Jul/2023 0.00 15-Dec-2023 0.00 16-Dec-2024 5.00 Dec/2029 Central African 0.00 Jul/2023 0.00 15-Dec-2023 0.00 16-Dec-2024 5.00 Dec/2029 Republic (Number) Chad (Number) 0.00 Jul/2023 0.00 15-Dec-2023 0.00 16-Dec-2024 5.00 Dec/2029 UNSD minimum list gender 32.00 Jul/2023 32 01-Feb-2024 32 16-Dec-2024 195.00 Dec/2029 indicators available using Comments on Project activities that will produced those indicators are at preparatory stages in data collected under the achieving targets participating countries. project within the past five years (Number) Gabon (Number) 5 Jan/2024 5 01-Feb-2024 5 16-Dec-2024 39 Dec/2029 Republic of Congo 0 Jan/2024 0 01-Feb-2024 0 16-Dec-2024 39 Dec/2029 (Number) Cameroon (Number) 10.00 Jul/2023 10.00 15-Dec-2023 10.00 16-Dec-2024 39.00 Dec/2029 Central African 8.00 Jul/2023 8.00 15-Dec-2023 8.00 16-Dec-2024 39.00 Dec/2029 Republic (Number) Chad (Number) 9.00 Jul/2023 9.00 15-Dec-2023 9.00 16-Dec-2024 39.00 Dec/2029 Component 2: Statistical Modernization, Institutional Reform, Human Capital, Data Accessibility and Use Baseline Actual (Previous) Actual (Current) Closing Period Indicator Name Value Month/Year Value Date Value Date Value Month/Year People using digitally enabled 0 16-Dec-2024 0 Dec/2029 services (Number of people) Comments on Not applicable CRI achieving targets People using digitally 0 16-Dec-2024 0 Dec/2029 enabled services – Comments on Not applicable Female (Number of achieving targets people) CRI 0 16-Dec-2024 0 Dec/2029 Jan 27, 2025 Page 8 of 16 The World Bank Implementation Status & Results Report Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2) (P180085) People using digitally Comments on Not applicable enabled services – achieving targets Youth (Number of people) CRI National platforms are No Jul/2023 No 15-Dec-2023 No 15-Dec-2023 Yes Dec/2029 upgraded to enable newly Comments on To date no new indicator have been produce by the project in participating countries produced data generated by achieving targets the project are made publicly accessible and stored in a secure data archive (Yes/No) Gabon (Yes/No) No Jan/2024 No 01-Feb-2024 No 01-Feb-2024 Yes Dec/2029 Republic of Congo No Jan/2024 No 01-Feb-2024 No 01-Feb-2024 Yes Dec/2029 (Yes/No) Cameroon (Yes/No) No Jul/2023 No 15-Dec-2023 No 15-Dec-2023 Yes Dec/2029 Central African No Jul/2023 No 15-Dec-2023 No 15-Dec-2023 Yes Jun/2029 Republic (Yes/No) Chad (Yes/No) No Jul/2023 No 15-Dec-2023 No 15-Dec-2023 Yes Dec/2029 Provisional reports released 0.00 Jul/2023 0.00 15-Dec-2023 0.00 15-Dec-2023 100.00 Dec/2029 on census and surveys Comments on Censuses and surveys are under preparation in participating countries financed by the project achieving targets (Percentage) Gabon (Percentage) 0 Jan/2024 0 01-Feb-2024 0 27-Dec-2024 100 Dec/2029 Republic of Congo 0 Jan/2024 0 01-Feb-2024 0 27-Dec-2024 100 Dec/2029 (Percentage) Cameroon 0.00 Jul/2023 0.00 15-Dec-2023 0.00 27-Dec-2024 100.00 Dec/2029 (Percentage) Central African 0.00 Jul/2023 0.00 15-Dec-2023 0.00 27-Dec-2024 100.00 Dec/2029 Republic (Percentage) Jan 27, 2025 Page 9 of 16 The World Bank Implementation Status & Results Report Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2) (P180085) Chad (Percentage) 0.00 Jul/2023 0.00 15-Dec-2023 0.00 27-Dec-2024 100.00 Dec/2029 Forums conducted between 0.00 Jul/2023 0 01-Feb-2024 0 01-Feb-2024 25.00 Dec/2029 producers and users to discuss survey design, findings and policy implications (Number) Gabon (Number) 0 Jan/2024 0 01-Feb-2024 0 01-Feb-2024 5 Dec/2029 Republic of Congo 0 Jan/2024 0 01-Feb-2024 0 01-Feb-2024 5 Dec/2029 (Number) Cameroon (Number) 0.00 Jul/2023 0.00 15-Dec-2023 0.00 15-Dec-2023 5.00 Jun/2029 Central African 0.00 Jul/2023 0.00 15-Dec-2023 0.00 15-Dec-2023 5.00 Dec/2029 Republic (Number) Chad (Number) 0.00 Jul/2023 0.00 15-Dec-2023 0.00 15-Dec-2023 5.00 Dec/2029 Female - Trained National 0.00 Jul/2023 0 01-Feb-2024 0 01-Feb-2024 205.00 Dec/2029 Statistics System staff to be Comments on capacity building have not yet started involved in new statistics achieving targets production (Number) Gabon (Number) 0 Jan/2024 0 01-Feb-2024 0 01-Feb-2024 40 Dec/2029 Republic of Congo 0 Jan/2024 0 01-Feb-2024 0 01-Feb-2024 60 Dec/2029 (Number) Cameroon (Female) 0.00 Jul/2023 0.00 15-Dec-2023 0.00 15-Dec-2023 70.00 Dec/2029 (Number) Central African 0.00 Jul/2023 0.00 15-Dec-2023 0.00 15-Dec-2023 15.00 Dec/2029 Republic (Female) (Number) Chad (Female) 0.00 Jul/2023 0.00 15-Dec-2023 0.00 15-Dec-2023 20.00 Dec/2029 (Number) Male - Trained National 0.00 Jul/2023 0.00 15-Dec-2023 0.00 15-Dec-2023 720.00 Dec/2029 Statistics System staff to be Jan 27, 2025 Page 10 of 16 The World Bank Implementation Status & Results Report Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2) (P180085) involved in new statistics production (Number) Gabon (Number) 0 Jan/2024 0 01-Feb-2024 0 01-Feb-2024 120 Dec/2029 Republic of Congo 0 Jan/2024 0 01-Feb-2024 0 01-Feb-2024 200 Dec/2029 (Number) Chad (Male) 0.00 Jul/2023 0.00 15-Dec-2023 0.00 15-Dec-2023 100.00 Dec/2029 (Number) Cameroon (Male) 0.00 Jul/2023 0.00 15-Dec-2023 0.00 15-Dec-2023 200.00 Dec/2029 (Number) Central African 0.00 Jul/2023 0.00 15-Dec-2023 0.00 15-Dec-2023 100.00 Dec/2029 Republic (Male) (Number) Female - Scholarship 0.00 Jul/2023 0.00 15-Dec-2023 0.00 15-Dec-2023 23.00 Dec/2029 students who succeed in Comments on The project scholarship program has started in CAR and Chad. To date, no students have graduating (Number) achieving targets graduated. Gabon (Number) 0 Jan/2024 0 01-Feb-2024 0 01-Feb-2024 7 Dec/2029 Central African 0.00 Jul/2023 0.00 15-Dec-2023 0.00 15-Dec-2023 3.00 Dec/2029 Republic (Female) (Number) Chad (Female) 0.00 Jul/2023 0.00 15-Dec-2023 0.00 15-Dec-2023 5.00 Dec/2029 (Number) Republic of Congo 0 Jan/2024 0 01-Feb-2024 0 01-Feb-2024 8 Dec/2029 (Number) Male - Scholarship students 0.00 Jul/2023 0 01-Feb-2024 0 01-Feb-2024 84.00 Dec/2029 who succeed in graduating Comments on The project scholarship program has started in CAR and Chad. To date, no students have (Number) achieving targets graduated. Republic of Congo 0 Jan/2024 0 01-Feb-2024 0 01-Feb-2024 24 Dec/2029 (Number) Gabon (Number) 0 Jan/2024 0 01-Feb-2024 0 01-Feb-2024 25 Dec/2029 Jan 27, 2025 Page 11 of 16 The World Bank Implementation Status & Results Report Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2) (P180085) Central African 0.00 Jul/2023 0.00 15-Dec-2023 0.00 15-Dec-2023 10.00 Dec/2029 Republic (Male) (Number) Chad (Male) 0.00 Jul/2023 0.00 15-Dec-2023 0.00 15-Dec-2023 25.00 Dec/2029 (Number) Data Quality Frameworks No Jul/2023 No 15-Dec-2023 No 15-Dec-2023 Yes Dec/2029 adopted the United Nations Comments on United Nations Quality Assurance Frameworks Manual for Official Statistics (UN NQAF Quality Assurance achieving targets Manual) is applied. The manual is found at: Frameworks Manual for https://unstats.un.org/unsd/methodology/dataquality/ Official Statistics (Yes/No) Gabon (Yes/No) No Jan/2024 No 01-Feb-2024 No 01-Feb-2024 Yes Dec/2029 Republic of Congo No Jan/2024 No 01-Feb-2024 No 01-Feb-2024 Yes Dec/2029 (Yes/No) Cameroon (Yes/No) No Jul/2023 No 15-Dec-2023 No 15-Dec-2023 Yes Dec/2029 Central African No Jul/2023 No 15-Dec-2023 No 15-Dec-2023 Yes Dec/2029 Republic (Yes/No) Chad (Yes/No) No Jul/2023 No 15-Dec-2023 No 15-Dec-2023 Yes Dec/2029 User satisfaction surveys No Jul/2023 No 15-Dec-2023 No 15-Dec-2023 Yes Dec/2029 conducted in participating Comments on The survey is under preparation in participating countries. Not yet implemented. countries (Yes/No) achieving targets Gabon (Yes/No) No Jan/2024 No 01-Feb-2024 No 01-Feb-2024 Yes Dec/2029 Republic of Congo No Jan/2024 No 01-Feb-2024 No 01-Feb-2024 Yes Dec/2029 (Yes/No) Cameroon (Yes/No) No Jul/2023 No 15-Dec-2023 No 15-Dec-2023 Yes Dec/2029 Central African No Jul/2023 No 15-Dec-2023 No 15-Dec-2023 Yes Dec/2029 Republic (Yes/No) Chad (Yes/No) No Jul/2023 No 15-Dec-2023 No 15-Dec-2023 Yes Dec/2029 Component 3: Construction, Upgrading and Modernization of Physical Infrastructure Jan 27, 2025 Page 12 of 16 The World Bank Implementation Status & Results Report Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2) (P180085) Baseline Actual (Previous) Actual (Current) Closing Period Indicator Name Value Month/Year Value Date Value Date Value Month/Year Physical and/or ICT No Jul/2023 No 15-Dec-2023 No 16-Dec-2024 Yes Dec/2029 infrastructure upgraded and operational (Yes/No) No Jan/2024 No 01-Feb-2024 No 16-Dec-2024 Yes Dec/2029 Republic of Congo Comments on The project is not yet effective (Yes/No) achieving targets Gabon (Yes/No) No Jan/2024 No 01-Feb-2024 No 16-Dec-2024 Yes Dec/2029 Cameroon (Yes/No) No Jul/2023 No 15-Dec-2023 No 16-Dec-2024 Yes Dec/2029 Central African No Jul/2023 No 15-Dec-2023 No 16-Dec-2024 Yes Dec/2029 Republic (Yes/No) Chad (Yes/No) No Jul/2023 No 15-Dec-2023 No 16-Dec-2024 Yes Dec/2029 Jan 27, 2025 Page 13 of 16 The World Bank Implementation Status & Results Report Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2) (P180085) 7. DATA ON FINANCIAL PERFORMANCE 7.1 Cumulative Disbursements 7.2 Disbursements (by loan) Loan/Credit/TF Status Original Revised Cancelled Disbursed Undisbursed % Disbursed Not IDA-75280 60.00 60.11 0.00 0.00 60.11 0% Effective IBRD-96610 Effective 90.00 90.00 0.00 15.47 74.09 17.27% Not IDA-74000 96.60 94.53 0.00 0.00 94.53 0% Effective Jan 27, 2025 Page 14 of 16 The World Bank Implementation Status & Results Report Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2) (P180085) Not IDA-73990 8.40 8.28 0.00 0.00 8.28 0% Effective IDA-E2250 Effective 60.00 58.81 0.00 8.99 49.95 15.26% IDA-E2220 Effective 20.00 19.78 0.00 4.83 14.96 24.40% IDA-E2210 Effective 105.00 103.76 0.00 16.20 87.72 15.59% 7.3 Key Dates (by loan) Loan/Credit/TF Status Approval Signing Effectiveness Orig. Closing Rev. Closing IBRD-96610 Effective 22-Mar-2024 19-Apr-2024 16-Oct-2024 31-Dec-2029 31-Dec-2029 Not IDA-73990 28-Sep-2023 31-Dec-2029 31-Dec-2029 Effective Not IDA-74000 28-Sep-2023 31-Dec-2029 31-Dec-2029 Effective Not IDA-75280 22-Mar-2024 17-Apr-2024 31-Dec-2029 31-Dec-2029 Effective IDA-E2210 Effective 28-Sep-2023 19-Oct-2023 04-Jan-2024 31-Dec-2029 31-Dec-2029 IDA-E2220 Effective 28-Sep-2023 13-Nov-2023 11-Jun-2024 31-Dec-2029 31-Dec-2029 IDA-E2250 Effective 28-Sep-2023 17-Oct-2023 11-Jan-2024 31-Dec-2029 31-Dec-2029 8. KEY DATES Key Events Planned Actual Approval 28-Sep-2023 28-Sep-2023 Effectiveness 04-Jan-2024 04-Jan-2024 Mid-Term Review No. 01 31-Dec-2026 Operation Closing/Cancellation 31-Dec-2029 9. RESTRUCTURING HISTORY Jan 27, 2025 Page 15 of 16 The World Bank Implementation Status & Results Report Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2) (P180085) 10. ASSOCIATED OPERATION(S) There are no associated operations Jan 27, 2025 Page 16 of 16