STRATEGIC IRRIGATION MODERNIZATION AND URGENT REHABILITATION PROJECT (SIMURP) Summary Procurement Plan Version No.: 1.1 Date: September 16, 2021 I. General Information 1. Project information: a. Country: Indonesia b. Borrower: Ministry of Finance, Republic of Indonesia c. Project Name: Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP) d. Loan No.: IBRD LOAN L0060A; and AIIB LOAN 8891-ID e. Applicable Procurement Procedures: World Bank Procurement and Consultant Guidelines of January 2011, Revised July 2014 f. The Executing Agency: Directorate Irrigation and Lowlands, Directorate General of Water Resources (DGWR), Ministry Public Works and Housing (MPWH) (i) Central Project Management Unit (CPMU): Directorate of Water Resources Development, DGWR, MPWH (ii) Central Project Implementing Unit (CPIU): Directorate Irrigation and Lowland, DGWR, MPWH (CPIU IRWA) (iii) National Project Implementing Unit (NPIU): • Directorate of Operations and Maintenance Directorate General of Natural Resources, MPWH (NPIU OP-PSDA), • Directorate General of Regional Development (SUPD I and SUPD II) Ministry of Home Affairs (NPIU Bangda) • Ministry of Agriculture's Extension and Agricultural Human Resources Development Agency Agriculture (NPIU Agriculture) (iv) Project Implementing Units (PIUs): DGWR’s River Basin Organizations (Balai Besar/Balai Wilayah Sunga, B/BWS) of Brantas, Citarum, Serayu Opak, Sumatera VIII, Sumatera II, Nusa Tenggara I 2. Bank’s No Objection Date of the Procurement Plan: a. Original : May 22, 2018 b. Last version : September 12, 2021 c. This version : September 21, 2021 3. Date of General Procurement Notice: May 7, 2020 4. Period covered by this procurement plan: May 22, 2018 – Project Closing Date (June 30, 2024) II. Types of Contract, Bank’s Review Requirements and Applied Methods A. Works, Goods and Non-Consulting Services 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Procurement Guidelines: Ref. Procureme Bank’s Review Procurement Method No. nt Method Requirement 1. International Competitive ≥ $25 million Threshold Each contract shall Bidding (Works) be subject to Bank’s prior review. 2. National Competitive < $25 million Each contract ≥ Bidding (Works) $10 million equivalent shall be subject to Bank’s prior review. All other contracts 3. Shopping for Works < $200k subject No post prior to review review. (only post review). 4. International Competitive ≥$2 million Each contract ≥ $2 Bidding (Goods) million equivalent shall be subject to Bank’s prior review. All other contracts subject to post 5. National Competitive review. <$2 million Each contract ≥ $2 Bidding (Goods) million equivalent shall be subject to Bank’s prior review. All other contracts subject to post 6. Shopping for Goods <100k review. No prior review (only post review). 7. International Competitive ≥$10 million Each contract shall Bidding (Non-Consultant be subject to Bank’s Service) prior review. 8. National Competitive <$10 million Each contract ≥ $2 Bidding (Non-Consultant million equivalent Service) shall be subject to Bank’s prior review. All other contracts subject to post 9. Shopping for Non- <$100k review. No prior review Consulting Services (only post review). 10. Direct Contracting Subject to ≥ $2million and paragraph justification shall be 3.7 of the provided when Procurement submit procurement Guidelines plan. 1. Pre-qualification: Prequalification is not used instead post qualification shall be followed for all national competitive bidding under the project. 2. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: As specified in the Project Operations Manual (POM) 3. Reference to (if any) Project Operational/Procurement Manual: Project Operations Manual of SIMURP 4. Any Other Special Procurement Arrangements: -NA- 5. Summary of the Procurement Packages 1 2 3 4 5 Ref. Description Review Estimate Number No. by Bank d of Cost Package (US$ s mil.) ICB A. 1. Works Prior - - 2. Goods and Supply Prior 2.5 1 &Installation 3. Non-consulting Services Prior - - B. NCB 1. Works Prior 165 11 2. Works Post 82 17 3. Goods and Supply & Prior - - Installation 4. Goods and Supply & Post - - Installation 5. Non-consulting Services Prior - - 6. Non-consulting Services Post 0.2 3 C. Shopping 1. Works Post 2. Goods Post 0.18 7 3. Non-consulting Services Post 0.14 2 D. Direct Contracting 1. Works Post - - 2. Goods Post 0.56 1 3. Non-consulting Services Post 0.28 2 Total (All methods and Review 250,85 44 Requirements) B. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to prior review by Bank as stated in Appendix 1 to the Consultant Guidelines: Ref. Selection Selection Method Bank’s Prior Review No. Method Threshold Requirement 1. QCBS and all Applied to all Each contract equal to other methods, estimated value. No or above $1,000,000 including QBS, threshold. equivalent shall be FBS and LCS subject to Bank’s prior (Firms) review. All other contracts subject to post review. (Prior review from technical perspective of only the draft TOR 2. CQS (Firms) Only for estimated and No draft prior cost (only review contract value < $ estimate). post review). 300,000 as per paragraph 3.7 of the 3. Single Source Consultant No selection Guidelines. method Each contract equal to Selection of threshold. Subject to or above $1,000,000 Firms justification for Singe equivalent shall be Source Selection of subject to Bank’s prior firms as per para. 3.9 review. All other and 3.10 of the contracts subject to Consultant Guidelines. post review. (Prior review from technical perspective of only the draft TOR, Justification for use of Single Source Selection method and draft cost estimate, shall be sent for the Bank’s prior approval as part of the procurement plan). Ref. Selection Selection Method Bank’s Prior Review No. Method Threshold Requirement 4. Competitive No threshold. No prior review (only Selection of post review), unless Individual contract is equal to or Consultants above $300,000. (comparison of at least 3 CVs) (Prior review from technical perspective of only the draft TOR. In addition, the Bank’s prior review and no objection shall be also obtained for the exceptional deviations from the normal competitive selection procedure of individual consultants subject to the Bank’s expost- 5. Single Source No Threshold. No prior review in (only review listed Selection of post review), paragraph 5.4unless (a)-(c) of Individual Subject to justification the Consultant to or contract is equal Consultants for single source of above $300,000. Guidelines). individuals as per para. 5.4 of the (Prior review from Consultant Guidelines technical perspective of only the draft TOR, Justification for use of Single Source Selection method together with CV of the recommended candidate and draft cost estimate, shall be sent for the Bank’s 2. Short list comprising entirely of national consultants prior approval : Short as part of the procurement list of consultants for services (firms), estimated to cost less than US$ 400,000 equivalent per contract, may plan).comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: N/A 4. Summary of Consultancy Assignments 1 2 3 4 5 Ref. Description Review Estimate Number No. by Bank d of Cost Package (US$ s mil.) A. Consulting Firm 1. QCBS and all other Prior 64.7 9 methods 2. QCBS and all other Post 0.56 1 methods 3. CQS Post 0.26 2 4. Single-Source Post/Prior - - Sub-total (All methods and Review 65.52 12 Requirements) B. Individual Consultant 1. Competitive Selection Prior - - 2. Single-Source Prior - - 3. Competitive Selection Post 0.89 141) 4. Single-Source Post 0.38 3 Sub-total (All methods and Review 1.27 17 Requirements) 1) limited approach PROCUREMENT Indonesia : Strategic Irrigation Modernization and Urgent Rehabilitation Project PLAN General Information Country: Indonesia Bank’s Approval Date of the Original Procurement Plan: 2020-04-26 2021-09-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P157585 GPN Date: 2020-05-07 Project Name: Strategic Irrigation Modernization and Urgent Rehabilitation Project Loan / Credit No: COFN / C1530, IBRD / 88910 D Executing Agency(ies): irectorate of Irrigation and Lowland WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned ID-DIL-169597-CW-RFB / Component A: Urgent Single Stage - One 2023-01- Rehabilitation of DI. COFN / C1530 Rehabilitation of Irrigation Prior Request for Bids Open - National 6,819,556.00 0.00 Canceled 2020-04-22 2020-05-06 2020-06-12 2020-08-13 2020-10-28 Envelope 16 Pamukkulu and Drainage System ID-DIL-169608-CW-RFB / Component B: Strategic Single Stage - One 24,296,296.0 20,891,218. 2022-07- Modernization of SS. Macan COFN / C1530 Modernization of Irrigation Prior Request for Bids Open - National Signed 2020-04-22 2020-04-27 2020-04-28 2020-05-28 2020-07-16 2020-06-27 2020-09-24 2020-07-27 2020-11-12 Envelope 0 54 17 Cs. and Drainage System ID-DIL-169615-CW-RFB / Component B: Strategic Single Stage - One 16,888,889.0 12,941,040. 2022-07- Modernization of SS. COFN / C1530 Modernization of Irrigation Prior Request for Bids Open - National Signed 2020-04-22 2020-04-29 2020-04-24 2020-05-28 2020-07-16 2020-06-27 2020-10-01 2020-07-27 2020-11-12 Envelope 0 42 17 Pamanukan Cs and Drainage System ID-DIL-169616-CW-RFB / Component A: Urgent Single Stage - One 2,565,037.8 2022-04- Rehabilitation of DI Jurang COFN / C1530 Rehabilitation of Irrigation Post Request for Bids Open - National 3,874,074.00 Signed 2020-04-22 2020-04-27 2020-05-06 2020-06-12 2020-07-13 2020-07-12 2020-10-07 2020-08-23 2020-10-16 Envelope 0 25 Batu and Drainage System Component A: Urgent Under ID-DIL-169617-CW-RFB / Single Stage - One 2022-08- COFN / C1530 Rehabilitation of Irrigation Prior Request for Bids Open - National 9,826,667.00 0.00 Implementat 2020-04-22 2020-04-29 2020-05-06 2020-06-12 2020-08-25 2020-07-12 2020-10-21 2020-08-18 Rehabilitation of DI. Talang Envelope 08 and Drainage System ion ID-DIL-169619-CW-RFB / Component A: Urgent Under Single Stage - One 2023-04- Rehabilitation of DIR Karang COFN / C1530 Rehabilitation of Irrigation Prior Request for Bids Open - National 8,380,921.00 0.00 Implementat 2020-04-22 2020-04-29 2020-05-06 2020-06-12 2020-07-20 2020-07-12 2020-09-27 2020-08-18 Envelope 05 Agung Hilir Phase I and Drainage System ion ID-DIL-173265-CW-RFB / Component A: Urgent Under Single Stage - One 2020-08- Rehabilitation of DI. COFN / C1530 Rehabilitation of Irrigation Prior Request for Bids Open - National 6,819,556.00 0.00 Implementat 2019-11-08 2020-05-13 2019-11-13 2019-12-25 2019-11-27 2020-01-24 2020-05-19 2020-02-28 Envelope 26 Pamukkulu and Drainage System ion Component A: Urgent Under ID-DIL-173287-CW-RFB / Single Stage - One 2022-03- COFN / C1530 Rehabilitation of Irrigation Prior Request for Bids Open - National 5,466,444.00 0.00 Implementat 2020-05-13 2020-05-18 2020-05-20 2020-06-26 2020-08-24 2020-07-10 2020-11-04 2020-08-24 Rehabilitasi DI. Kedung Putri Envelope 07 and Drainage System ion Component A: Urgent ID-DIL-173293-CW-RFB / Single Stage - One 2,128,030.7 2021-10- COFN / C1530 Rehabilitation of Irrigation Post Request for Bids Open - National 2,986,726.00 Signed 2020-05-13 2020-06-19 2020-05-20 2020-06-26 2020-07-03 2020-07-10 2020-08-11 2020-08-14 2020-09-08 Rehabilitasi Bendung Cikeusik Envelope 7 08 and Drainage System ID-DIL-197310-CW-RFB / Component A: Urgent Under Rehabilitasi Jaringan irigasi DI. Single Stage - One 2021-12- IBRD / 88910 Rehabilitation of Irrigation Post Request for Bids Open - National 2,091,260.00 0.00 Implementat 2020-10-02 2020-10-20 2020-10-04 2020-11-08 2020-11-20 2020-11-22 2020-12-17 2020-12-08 Sei Ular (Ramonia) Kab. Deli Envelope 08 and Drainage System ion Serdang ID-DIL-197311-CW-RFB / Component A: Urgent Rehabilitasi Jaringan Irigasi DI. Single Stage - One 10,670,867.0 2021-07- IBRD / 88910 Rehabilitation of Irrigation Prior Request for Bids Open - National 0.00 Canceled 2020-10-02 2020-10-06 2020-10-07 2020-11-18 2020-12-01 2020-12-18 2021-02-08 2021-01-22 Sei Ular (Perbaungan) Kab. Envelope 0 21 and Drainage System Serdang Bedagai ID-DIL-209965-CW-RFB / Component A: Urgent Single Stage - One 10,108,928.0 2022-10- Rehabilitasi Jaringan Irigasi DI. IBRD / 88910 Rehabilitation of Irrigation Prior Request for Bids Open - National 0.00 Canceled 2020-12-17 2021-01-06 2020-12-22 2021-01-22 2021-02-22 2021-02-05 2021-03-07 Envelope 0 28 Cikeusik and Drainage System ID-DIL-221353-CW-RFB / No Regret Measures Daerah Component B: Strategic Under Single Stage - One 2023-01- Irigasi Jatiluhur (Rehabilitasi IBRD / 88910 Modernization of Irrigation Post Request for Bids Open - National 2,058,541.00 0.00 Implementat 2021-02-24 2021-03-12 2021-03-08 2021-04-08 2021-04-13 2021-04-22 2021-05-07 2021-05-13 Envelope 03 Talang BTT. 11 A Saluran and Drainage System ion Tarum Timur) National ID-DIL-233935-CW-RFB / Component A: Urgent Procurement Under REHABILITASI IRIGASI D.I. SEI Single Stage - One 10,553,488.0 2023-08- IBRD / 88910 Rehabilitation of Irrigation Prior Request for Bids Open - National Document - 1 0.00 Implementat 2021-05-10 2021-05-17 2021-05-18 2021-06-20 2021-06-24 2021-07-20 2021-08-29 ULAR (PERBAUNGAN) KAB. Envelope 0 19 and Drainage System Envelope process ion SERDANG BEDAGAI (Non Bank-SPD) National ID-DIL-238192-CW-RFB / Component A: Urgent Procurement Under Procurement of Rehabilitation Single Stage - One 2022-04- COFN / C1530 Rehabilitation of Irrigation Post Request for Bids Open - National Document - 1 1,750,000.00 0.00 Implementat 2021-06-30 2021-06-07 2021-07-05 2021-08-16 2021-09-15 2021-10-20 Tertiary Canal of DI. Kedung Envelope 18 and Drainage System Envelope process ion Putri (Phase 1) (Non Bank-SPD) National ID-DIL-238572-CW-RFB / Component A: Urgent Procurement Under Single Stage - One 2022-04- Rehabilitation Tertiary Canal COFN / C1530 Rehabilitation of Irrigation Post Request for Bids Open - National Document - 1 1,225,000.00 0.00 Implementat 2021-06-30 2021-06-08 2021-07-05 2021-08-16 2021-09-15 2021-10-20 Envelope 18 of DI. Jurang Batu (Phase 1) and Drainage System Envelope process ion (Non Bank-SPD) ID-DIL-240456-CW-RFB / Component A: Urgent Pending Single Stage - One Other (with field 2022-05- Revitalization of DI Kedung COFN / C1530 Rehabilitation of Irrigation Post Request for Bids Open - National 6,901,550.00 0.00 Implementat 2021-07-31 2021-08-05 2021-09-16 2021-10-16 2021-11-20 Envelope for explanation) 19 Putri (Lanjutan) and Drainage System ion ID-DIL-240458-CW-RFB / Component A: Urgent Pending Single Stage - One Other (with field 2022-05- Rehabilitation of DI. Talang COFN / C1530 Rehabilitation of Irrigation Post Request for Bids Open - National 1,795,400.00 0.00 Implementat 2021-07-31 2021-08-05 2021-09-16 2021-10-16 2021-11-20 Envelope for explanation) 19 (lanjutan) and Drainage System ion ID-DIL-240460-CW-RFB / Component A: Urgent Pending Single Stage - One Other (with field 2022-05- Rehabilitation Tertiary Canal COFN / C1530 Rehabilitation of Irrigation Post Request for Bids Open - National 2,915,000.00 0.00 Implementat 2021-07-31 2021-08-05 2021-09-16 2021-10-16 2021-11-20 Envelope for explanation) 19 of DI. Talang (Phase 1) and Drainage System ion ID-DIL-240461-CW-RFB / Component A: Urgent Under Rehabilitation Tertiary Canal Single Stage - One Other (with field 2022-05- COFN / C1530 Rehabilitation of Irrigation Post Request for Bids Open - National 1,063,000.00 0.00 Implementat 2021-07-31 2021-09-20 2021-08-05 2021-09-16 2021-10-16 2021-11-20 of DI. Pamukkulu-Kab. Envelope for explanation) 19 and Drainage System ion Takalar (Phase 1) Page 1 ID-DIL-240462-CW-RFB / Component A: Urgent Pending Single Stage - One Other (with field 2022-05- Rehabilitation and Upgrading COFN / C1530 Rehabilitation of Irrigation Post Request for Bids Open - National 8,170,000.00 0.00 Implementat 2021-07-31 2021-08-05 2021-09-16 2021-10-16 2021-11-20 Envelope for explanation) 19 of DIR. Katingan I (Phase 1) and Drainage System ion ID-DIL-240465-CW-RFB / Component B: Strategic Under Civil Works for (ETC) SS Single Stage - One Other (with field 24,190,000.0 2022-05- COFN / C1530 Modernization of Irrigation Prior Request for Bids Open - National 0.00 Implementat 2021-07-31 2021-07-29 2021-08-05 2021-09-16 2021-10-16 2021-11-20 Salamdarma Kiri Cs, SS Envelope for explanation) 0 19 and Drainage System ion Gadung Cs, , SS. Pawelutan CS ID-DIL-240466-CW-RFB / National Civil Works for (ETC) SS Component B: Strategic Procurement Under Single Stage - One 21,515,000.0 2022-05- Kamojing Cs, SS. Telar, SS. COFN / C1530 Modernization of Irrigation Prior Request for Bids Open - National Document - 1 0.00 Implementat 2021-07-31 2021-07-29 2021-08-05 2021-09-16 2021-10-16 2021-11-20 Envelope 0 19 Barugbug Cs, SS. Tapen Cs, SI. and Drainage System Envelope process ion Tarum Timur (Non Bank-SPD) National ID-DIL-242280-CW-RFB / Component A: Urgent Procurement Under Single Stage - One 2023-06- Rehabilitasi jaringan Irigasi DI. IBRD / 88910 Rehabilitation of Irrigation Post Request for Bids Open - National Document - 1 9,763,038.00 0.00 Implementat 2021-07-09 2021-07-14 2021-07-12 2021-08-16 2021-08-12 2021-09-15 2021-10-19 Envelope 11 Cikeusik and Drainage System Envelope process ion (Non Bank-SPD) ID-DIL-249647-CW-RFB / Component A: Urgent Rehabilitation and Single Stage - One Other (with field 20,709,100.0 Under 2022-06- COFN / C1530 Rehabilitation of Irrigation Prior Request for Bids Open - National 0.00 2021-09-01 2021-09-06 2021-10-18 2021-11-17 2021-12-22 Modernization DI. Glapan Envelope for explanation) 0 Review 20 and Drainage System Timur Component A: Urgent Pending ID-DIL-249650-CW-RFB / Single Stage - One Other (with field 2022-08- COFN / C1530 Rehabilitation of Irrigation Post Request for Bids Open - National 9,497,000.00 0.00 Implementat 2021-11-01 2021-11-06 2021-12-18 2022-01-17 2022-02-21 Rehabilitation of DI. Jengkelok Envelope for explanation) 20 and Drainage System ion ID-DIL-249651-CW-RFB / Component A: Urgent Under Single Stage - One Other (with field 2022-07- Rehabilitation and COFN / C1530 Rehabilitation of Irrigation Post Request for Bids Open - National 5,174,000.00 0.00 Implementat 2021-10-01 2021-09-13 2021-10-06 2021-11-17 2021-12-17 2022-01-21 Envelope for explanation) 20 Improvement DI. Ameroro and Drainage System ion ID-DIL-249655-CW-RFB / Component A: Urgent Under Rehabilitation of Wadaslintang Single Stage - One Other (with field 17,063,000.0 2022-06- COFN / C1530 Rehabilitation of Irrigation Prior Request for Bids Open - National 0.00 Implementat 2021-09-01 2021-09-06 2021-10-18 2021-11-17 2021-12-22 Barat Main Canal DI. Envelope for explanation) 0 20 and Drainage System ion Wadaslintang Component A: Urgent Under ID-DIL-249656-CW-RFB / Single Stage - One Other (with field 2022-06- COFN / C1530 Rehabilitation of Irrigation Post Request for Bids Open - National 5,280,000.00 0.00 Implementat 2021-09-01 2021-09-20 2021-09-06 2021-10-18 2021-11-17 2021-12-22 Rehabilitation DI. Mbay Kanan Envelope for explanation) 20 and Drainage System ion ID-DIL-249657-CW-RFB / Component A: Urgent Pending Rehabilitation and Single Stage - One Other (with field 2022-06- COFN / C1530 Rehabilitation of Irrigation Post Request for Bids Open - National 7,867,000.00 0.00 Implementat 2021-09-01 2021-09-06 2021-10-18 2021-11-17 2021-12-22 Modernization DI. Saddang, Envelope for explanation) 20 and Drainage System ion Sub-unit Langnga Component A: Urgent Pending ID-DIL-249658-CW-RFB / Single Stage - One Other (with field 2022-08- COFN / C1530 Rehabilitation of Irrigation Post Request for Bids Open - National 9,511,000.00 0.00 Implementat 2021-11-01 2021-11-06 2021-12-18 2022-01-17 2022-02-21 Revitalization DI. Sempor Envelope for explanation) 20 and Drainage System ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ID-DIL-CS-A / TA DED & Component A: Urgent Quality And Cost- Under Supervision of Component A IBRD / 88910 Rehabilitation of Irrigation Prior Open - International 24,532,200.00 0.00 2019-10-03 2020-09-16 2019-10-24 2020-08-18 2020-12-19 2020-10-02 2021-02-22 2020-10-08 2021-08-27 2020-10-20 2020-10-30 2024-03-31 Based Selection Implementation SIMURP and Drainage System ID-DIL-CS-B / TA DED & Component B: Strategic Quality And Cost- Supervision of Component B IBRD / 88910 Modernization of Irrigation Prior Open - International 15,223,786.00 0.00 Under Review 2019-10-03 2020-09-16 2019-10-24 2020-08-18 2020-12-16 2020-10-02 2021-02-22 2020-10-08 2021-08-04 2020-10-20 2020-10-31 2024-03-31 Based Selection SIMURP and Drainage System ID-DIL-204654-CS-QCBS / Technical Assistance Study of Component C: Project Quality And Cost- IBRD / 88910 Prior Open - International 5,479,000.00 0.00 Canceled 2020-12-09 2020-12-29 2020-12-09 2021-01-28 2021-02-28 2021-03-22 2021-04-27 2021-05-05 2023-05-05 Lowland Development and Management Based Selection Peat Restoration ID-DIL-253705-CS-QCBS / TA Study of Lowland Component C: Project Quality And Cost- Pending IBRD / 88910 Prior Open - International 5,643,496.00 0.00 2021-09-16 2021-09-17 2021-10-15 2022-01-19 2022-02-02 2022-02-15 2022-03-15 2024-02-13 Development and Peat Management Based Selection Implementation Restoration INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ID-DIL-CS-INDPAMUKULU / Individual Component C: Project Pending Individual Consultant Bridging IBRD / 88910 Post Consultant Direct 6,428.57 0.00 2020-07-01 2020-07-11 2020-07-16 2020-08-18 2020-11-18 Management Implementation Supervision Selection Page 2