PROCUREMENT PLAN (Textual Part) Project information: Burundi - Great Lakes Trade Facilitation and Integration Project] (P174814) Project Implementation agency: Burundi-Ministry of Finance, Budget and Privatization Date of the Procurement Plan: November 8, 2021 Period covered by this Procurement Plan: December 2017 – December 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the country procurement handbook, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. - The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. - Rights for the Bank to review procurement documentation and activities. - An effective complaints mechanism. - Maintenance of records of the Procurement Process When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables : Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is Not Applicable Works: is not Applicable PROCUREMENT Eastern Africa : Great Lakes Trade Facilitation and Integration Project PLAN General Information Country: Eastern Africa Bank’s Approval Date of the Original Procurement Plan: 2018-07-23 2021-11-12 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P174814 GPN Date: Project Name: Great Lakes Trade Facilitation and Integration Project Loan / Credit No: IDA / V1000, IDA / V3250, IDA / V0960 Burundi-Ministry of Finance, Budget and Privatization Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BI-BI-MOF-71885-CW-DIR / Improving core trade Passation de Adduction d'eau au poste En cours 2019-01- IDA / V1000 infrastructure and facilities in A priori marché de gré à Direct 28,600.00 0.00 2018-07-27 2018-08-01 2018-09-18 frontière de Gatumba d'exécution 17 the border areas gré (Intervention rapide) BI-BI-MOF-71888-CW-RFQ / Improving core trade Aménagement des Latrines et Single Stage - One En cours 2019-01- IDA / V1000 infrastructure and facilities in A posteriori Demande de prix Limited 11,000.00 0.00 2018-08-11 2018-08-10 2018-10-02 douches au port de Rumonge Envelope d'exécution 04 the border areas (Intervention urgente) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-BI-MOF-170418-GO-RFQ Implementation support, / Acquisition des Single Stage - One En attente IDA / V3250 Communication, Monitoring, A posteriori Demande de prix Limited 50,000.00 0.00 2020-07-25 2020-09-19 2020-10-30 équipements de bureau Envelope d'exécution and Evaluation (mobilier et photocopieuse) BI-BI-MOF-170426-GO-RFQ Implementation support, Single Stage - One En cours / Acquisition du matériel IDA / V3250 Communication, Monitoring, A posteriori Demande de prix Limited 30,000.00 0.00 2020-07-12 2020-10-12 2020-08-28 2020-10-09 Envelope d'exécution informatique pour l'UGP and Evaluation BI-BI-MOF-170423-GO-RFB Implementation support, / Acquisition de Trois Single Stage - One IDA / V3250 Communication, Monitoring, A posteriori Appel d'offres Open - National 250,000.00 0.00 Annulé 2020-07-15 2020-07-20 2020-08-31 2020-09-15 2020-10-09 2020-12-01 véhicules (One station wagon Envelope and Evaluation 4*4 et deux camionnettes) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DMI/010/PFCGL-II/2018 / Conception détaillée Improving core trade Sélection fondée En cours nécessaire pour le site du IDA / V1000 infrastructure and facilities in A posteriori sur la qualité et le Open - International 200,000.00 0.00 2018-04-20 2018-04-16 2018-06-15 2018-09-13 2018-07-22 2018-07-05 2018-08-23 2018-09-28 2018-09-15 2018-10-05 2018-10-20 2018-10-23 2018-11-10 2019-02-11 d'exécution projet de construction du Port the border areas coût de Rumonge BI-BI-MOF-65618-CS-QCBS / Conception détaillée Improving core trade Sélection fondée nécessaire pour les sites du IDA / V1000 infrastructure and facilities in A posteriori sur la qualité et le Open - International 200,000.00 0.00 Annulé 2018-07-05 2018-07-26 2018-08-31 2018-10-03 2018-10-19 2018-11-16 2018-12-07 2019-02-07 poste frontalier et du marché the border areas coût frontalier de Gatumba BI-BI-MOF-65723-CS-QCBS / Conception des Improving core trade Sélection fondée infrastructures provisoires IDA / V1000 infrastructure and facilities in A posteriori sur la qualité et le Open - National 60,000.00 0.00 Annulé 2018-07-15 2018-08-10 2018-09-10 2018-10-15 2018-10-31 2018-11-21 2018-12-05 2019-03-05 aux postes frontaliers de the border areas coût Gatumba et au port de Rumonge BI-BI-MOF-71876-CS-QCBS Improving core trade Sélection fondée / Conception détaillée En cours IDA / V1000 infrastructure and facilities in A posteriori sur la qualité et le Open - International 80,000.00 0.00 2018-08-20 2018-11-19 2018-09-10 2018-11-20 2018-10-15 2019-01-24 2018-11-27 2019-01-15 2018-12-14 2019-01-25 2019-01-18 2019-04-15 2019-02-22 2019-05-27 nécessaire pour les sites du d'exécution the border areas coût poste frontière de Gatumba BI-BI-MOF-71879-CS-QCBS Improving core trade Sélection fondée / Conception détaillée En cours IDA / V1000 infrastructure and facilities in A posteriori sur la qualité et le Open - National 43,130.00 0.00 2018-08-23 2018-09-07 2018-09-13 2018-09-12 2018-10-19 2018-11-08 2018-11-23 2019-01-15 2018-12-10 2019-10-28 2019-01-14 2019-10-28 2019-02-11 2019-05-13 nécessaire pour le marché d'exécution the border areas coût frontalier de Gatumba BI-BI-MOF-96822-CS-LCS / Audit comptable et financier Implementation support, Sélection au En cours du PFCGL-II de la période IDA / V1000 Communication, Monitoring, A posteriori Open - International 25,000.00 0.00 2019-01-28 2019-02-22 2019-02-18 2019-05-20 2019-04-03 2019-10-30 2019-05-01 2019-10-30 2019-05-31 2019-10-30 2019-07-05 2019-08-09 2020-02-05 moindre coût d'exécution allant du 07/08/2017 au and Evaluation 30/06/2019 BI-BI-MOF-102626-CS-QCBS / Recrutement d'une firme de consultants pour le contrôle Improving core trade Sélection fondée et la surveillance des travaux IDA / V1000 infrastructure and facilities in A posteriori sur la qualité et le Open - International 100,000.00 0.00 Annulé 2019-03-14 2019-04-04 2019-05-17 2019-07-04 2019-07-19 2019-08-16 2019-10-08 2020-10-07 de construction du port de the border areas coût Rumonge et provision de services connexes Page 1 BI-BI-MOF-203504-CS-CQS / Recrutement d'un bureau chargé de l'élaboration de Sélection fondée Improving core trade l'étude pour l'aménagement et sur les En attente IDA / V3250 infrastructure and facilities in A posteriori Open - National 60,000.00 0.00 2020-11-18 2020-11-25 2021-01-08 2021-02-07 2021-02-19 2021-04-26 modernisation poste-frontière qualifications des d'exécution the border areas Vugizo-Kiliba + Etude consultants d'Impact Environnemental et Social (EIES) BI-BI-MOF-203512-CS-CQS / Recrutement d'un bureau en charge de l'élaboration de l'étude technique pour Sélection fondée l'aménagement et le bitumage Improving core trade sur les En attente de la RP 108: RN4(PK 14 + IDA / V3250 infrastructure and facilities in A posteriori Open - International 80,000.00 0.00 2020-12-01 2020-12-08 2021-01-14 2021-01-29 2021-02-11 2021-05-11 qualifications des d'exécution 8)/Gatumba- the border areas consultants Vuggizo/Frontière RDC (8km)+Etude d'Impact Environnemental et Social (EIES) BI-BI-MOF-203525-CS-CQS Sélection fondée / Etude de faisabilité sur les Improving core trade sur les En attente chaînes de valeur des produits IDA / V3250 infrastructure and facilities in A posteriori Open - International 200,000.00 0.00 2020-12-15 2020-12-22 2021-02-04 2021-02-18 2021-03-04 2021-05-19 qualifications des d'exécution agricoles, de pêche et de the border areas consultants fruits BI-BI-MOF-203488-CS-CQS / Etude pour la construction Sélection fondée du marché transfrontalier de Improving core trade sur les Rumonge (incluant l'étude de IDA / V3250 infrastructure and facilities in A posteriori 50,000.00 0.00 Annulé 2020-11-27 2020-12-10 2021-01-23 2021-02-10 2021-03-17 2021-05-25 qualifications des rentabilité et Etude d'Impact the border areas consultants Enironnemental et Social (EIES)) BI-BI-MOF-204468-CS-QCBS / Recrutement d'un cabinet pour la réalisation de l'audit Implementation of policy and opérationnel des procedural reforms and Sélection fondée administrations des services En attente IDA / V3250 capacity building to facilitate A posteriori sur la qualité et le Open - International 150,000.00 0.00 2020-12-21 2021-01-04 2021-02-03 2021-03-11 2021-03-30 2021-05-04 2021-05-31 2021-10-14 des frontières: étude sur d'exécution cross-border trade in goods coût l'efficacité et l'efficience and servic es institutionnelle des administrations des services des frontières BI-BI-MOF-207626-CS-CQS Sélection fondée / Etude pour la Improving core trade sur les En attente constructiondu marché IDA / V3250 infrastructure and facilities in A posteriori Open - National 40,000.00 0.00 2021-03-08 2021-03-15 2021-04-28 2021-05-28 2021-06-11 2021-09-30 qualifications des d'exécution transfrontalier de Rumonge the border areas consultants incluant l'étude de rentabilité BI-BI-MOF-207635-CS-CQS Sélection fondée Improving core trade / Etude pour l'aménagement sur les En cours IDA / V3250 infrastructure and facilities in A posteriori Open - International 40,000.00 0.00 2020-12-11 2020-12-22 2020-12-18 2021-01-26 2021-01-22 2021-02-21 2021-03-05 2021-05-17 et la modernisation du poste- qualifications des d'exécution the border areas frontière Vugizo-Kiliba consultants BI-BI-MOF-207711-CS-CQS Sélection fondée / Etude technique pour Improving core trade sur les En cours l'aménagement et le bitumage IDA / V3250 infrastructure and facilities in A posteriori Open - International 55,000.00 0.00 2020-12-09 2021-01-27 2020-12-14 2021-02-15 2021-01-20 2021-02-05 2021-02-15 2021-05-28 qualifications des d'exécution de la RP 108: RN4 (PK14 + the border areas consultants 8)Gatumba-Vugizo/frontière BI-BI-MOF-207744-CS-CQS / Recrutement d'un cabinet pour la réalisation de l'audit Implementation of policy and opérationnel des Sélection fondée procedural reforms and administrations des services sur les En cours IDA / V3250 capacity building to facilitate A posteriori Open - International 150,000.00 0.00 2021-01-15 2020-12-21 2021-01-29 2021-03-15 2021-03-14 2021-04-13 2021-05-04 2021-10-31 des frontières : étude sur qualifications des d'exécution cross-border trade in goods l'efficacité et l'efficience consultants and servic es institutionnelle des administrations des services des frontières BI-BI-MOF-207751-CS-CQS Sélection fondée / Etude de faisabilité sur les Improving core trade sur les En cours chaînes de valeurs des IDA / V3250 infrastructure and facilities in A posteriori Open - International 200,000.00 0.00 2020-12-15 2020-12-21 2020-12-22 2021-01-26 2021-02-04 2021-03-06 2021-03-19 2021-06-18 qualifications des d'exécution produits agricoles, de pêche the border areas consultants et de fruits BI-BI-MOF-221288-CS-LCS / Audit comptable et financier Implementation support, Sélection au En cours du projet pour la période IDA / V0960 Communication, Monitoring, A posteriori Open - International 20,000.00 0.00 2021-03-02 2021-03-01 2021-03-23 2021-05-10 2021-05-06 2021-06-03 2021-07-03 2021-08-07 2021-10-15 2021-12-15 moindre coût d'exécution allant du 01/07/2020 au and Evaluation 30/06/2021 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DMI/002/PFCGL-II/2017 / Elaboration du Cadre de Politique des Peuples Autochtones (CPPA), du Plan Improving core trade En attente en faveur des populations IDA / V1000 infrastructure and facilities in A posteriori Individuel Open 30,000.00 0.00 2017-12-11 2018-01-20 2018-02-06 2018-02-09 2018-03-18 d'exécution autochtones (PPA) du Cadre the border areas de Politique de Réinstallation (CPR) pour les activitésdu Projet GLTFP BI-BI-MOF-65639-CS-INDV / Improving core trade Etude sur la logistique et le IDA / V1000 infrastructure and facilities in A posteriori Individuel Open 50,000.00 0.00 Annulé 2018-07-27 2018-09-05 2018-09-19 2018-10-04 2018-12-18 transport the border areas BI-BI-MOF-65645-CS-INDV / Implementation of policy and Enquête auprès des procedural reforms and commerçants des associations IDA / V1000 capacity building to facilitate A posteriori Individuel Open 60,000.00 0.00 Annulé 2018-08-05 2018-09-12 2018-09-26 2018-10-10 2019-01-10 professionnelles et évaluation cross-border trade in goods des besoins pour le and servic es renforcement des capacités Page 2 BI-BI-MOF-71086-CS-INDV / Implementation support, Consultant Expert en En attente IDA / V1000 Communication, Monitoring, A posteriori Individuel Open 40,800.00 0.00 2018-07-24 2018-10-28 2018-11-20 2018-11-23 2019-05-19 Sauvegardes d'exécution and Evaluation Environnementales et Sociales BI-BI-MOF-71104-CS-INDV / Improving core trade Elaboration du Cadre de En attente IDA / V1000 infrastructure and facilities in A posteriori Individuel Open 16,210.00 0.00 2018-07-24 2018-08-31 2018-09-24 2018-09-25 2018-11-01 Gestion Environnementale et d'exécution the border areas Sociale (CGES) du Projet GLTFP DMI/006/PFCGL-II/2018 / Implementation support, En attente Consultant Responsable en IDA / V1000 Communication, Monitoring, A posteriori Individuel Open 40,800.00 0.00 2018-07-24 2018-09-16 2018-12-02 2018-12-03 2019-12-02 d'exécution Suivi-Evaluation and Evaluation DMI/004/PFCGL-II/2018 / Implementation support, En cours Consultant Expert en IDA / V1000 Communication, Monitoring, A posteriori Individuel Open 40,800.00 0.00 2018-01-26 2018-01-25 2018-05-25 2018-05-25 2018-05-28 2019-05-27 d'exécution Facilitation du Commerce and Evaluation BI-BI-MOF-65604-CS-INDV / Implementation support, En attente Consultant Responsable IDA / V1000 Communication, Monitoring, A posteriori Individuel Open 40,800.00 0.00 2018-06-07 2018-07-10 2018-07-17 2018-07-23 2019-07-22 d'exécution Administratif et Financier and Evaluation DMI/003/PFCGL-II/2018 / Implementation support, Consultant Coordinateur du IDA / V1000 Communication, Monitoring, A posteriori Individuel Open 48,000.00 0.00 En cours d'examen 2018-01-26 2018-01-19 2018-05-10 2018-05-10 2018-05-14 2019-05-13 projet and Evaluation DMI/007/PFCGL-II/2018 / Implementation support, En attente Consultant Responsable IDA / V1000 Communication, Monitoring, A posteriori Individuel Open 40,800.00 0.00 2018-01-26 2018-05-25 2018-05-28 2018-05-28 2019-05-27 d'exécution Passation des Marchés and Evaluation DMI/009/PFCGL-II/2018 / Implementation support, Consultant Comptable du IDA / V1000 Communication, Monitoring, A posteriori Individuel Open 24,000.00 0.00 En cours d'examen 2018-01-26 2018-06-08 2018-06-05 2018-06-07 2018-07-01 2019-06-30 projet and Evaluation BI-BI-MOF-65720-CS-INDV / Implementation of policy and Enumérateurs et Superviseurs procedural reforms and pour l'enquête de base et En cours IDA / V1000 capacity building to facilitate A posteriori Individuel Open 16,631.00 0.00 2018-06-27 2018-11-05 2018-08-06 2018-08-20 2018-08-31 2018-10-31 pour la collecte des données d'exécution cross-border trade in goods sur le commerce and servic es transfrontalier BI-BI-MOF-170399-CS-INDV / Recrutement d'un consultant Improving service delivery by pour réaliser l'identification et En cours IDA / V3250 agencies at the border/port A posteriori Individuel Open 30,000.00 0.00 2020-08-25 2020-11-05 2020-10-13 2020-11-03 2020-12-08 2021-02-13 la cartographie des d'exécution and citizen engagement associations des commerçants transfrontaliers BI-BI-MOF-170412-CS-INDV / Recrutement d'un consultant Implementation support, En attente en charge de l'élaboration IDA / V3250 Communication, Monitoring, A posteriori Individuel Open 20,000.00 0.00 2020-07-31 2020-09-18 2020-10-09 2020-11-13 2021-01-22 d'exécution d'une stratégie de and Evaluation communication du projet BI-BI-MOF-182061-CS-INDV Implementation support, En attente / Conception et réalisation du IDA / V3250 Communication, Monitoring, A posteriori Individuel Open 20,000.00 0.00 2020-08-24 2020-10-12 2020-11-02 2020-12-07 2021-01-29 d'exécution site web PFCGL-II and Evaluation BI-BI-MOF-182703-CS-CDS Implementation support, Sélection de / Audit comptable et financier En cours IDA / V3250 Communication, Monitoring, A posteriori consultants par Direct 20,000.00 0.00 2020-08-04 2020-07-15 2020-08-14 2020-08-11 2020-10-09 2020-11-30 du projet (exercice de juillet d'exécution and Evaluation entente directe 2019 à juin 2020) BI-BI-MOF-203519-CS-INDV Improving core trade / Recrutement d'un consultant IDA / V3250 infrastructure and facilities in A posteriori Individuel Open 20,000.00 0.00 Annulé 2020-11-17 2020-12-29 2021-01-12 2021-02-09 2021-03-15 pour la mise à jour du CGES et the border areas du CPR BI-BI-MOF-207798-CS-INDV Implementation support, En cours / Recrutement d'un expert en IDA / V3250 Communication, Monitoring, A posteriori Individuel Open 40,000.00 0.00 2020-12-09 2020-12-18 2021-01-20 2021-02-03 2021-02-08 2022-01-31 d'exécution infrastructures and Evaluation BI-BI-MOF-207950-CS-CDS / Entente Directe avec le Improving core trade Sélection de Consultant Dr NIYONKURU IDA / V3250 infrastructure and facilities in A posteriori consultants par Direct 15,000.00 0.00 Annulé 2020-12-10 2020-12-14 2020-12-24 2021-01-29 Charles pour l'Elaboration du the border areas entente directe CGES + Plan de Gestion des Pestes et Pesticides (PGPP) BI-BI-MOF-207964-CS-CDS / Entente Directe avec le Consultant CIMPAYE Joachim pour la Mise à jour des Improving core trade Sélection de rapports d'Impact IDA / V3250 infrastructure and facilities in A posteriori consultants par Direct 10,000.00 0.00 Annulé 2020-12-12 2020-12-22 2021-01-06 2021-02-15 Environnemental et Social the border areas entente directe (EIES) pour la construction du Port de Rumonge et la construction du marché de Gatumba BI-BI-MOF-207970-CS-CDS / Entente Directe avec le Consultant Dr MISAGO Improving core trade Sélection de Aloispour la Préparation du IDA / V3250 infrastructure and facilities in A posteriori consultants par Direct 10,000.00 0.00 Annulé 2020-12-18 2020-12-28 2021-01-13 2021-02-19 Plan dAction de Réinstallation the border areas entente directe (PAR) des Personnes affectées pour la construction du Port de Rumonge BI-BI-MOF-225823-CS-CDS / Entente Directe avec Monsieur NDIKUMANA Denis pour l'actualisation/mise à Improving core trade Sélection de En cours jour des EIES du sous-projet IDA / V0960 infrastructure and facilities in A posteriori consultants par Direct 10,000.00 0.00 2021-03-24 2021-03-24 2021-03-26 2021-03-25 2021-04-02 2021-05-03 d'exécution de construction du port de the border areas entente directe Rumonge et celui de construction du marché transfrontalier de Gatumba Page 3 BI-BI-MOF-239602-CS-CDS / Entente Directe avec le Implementation support, Sélection de En cours bureau GETA pour pour IDA / V0960 Communication, Monitoring, A posteriori consultants par Direct 79,400.00 0.00 2021-06-22 2021-06-17 2021-07-02 2021-07-30 2022-01-14 d'exécution l'élaboration du CGES du and Evaluation entente directe PFCIGL BI-BI-MOF-207962-CS-CDS / Entente Directe avec le Consultant BARAKAMFITIYE Improving core trade Sélection de Tharcisse pour l'Elaboration IDA / V3250 infrastructure and facilities in A posteriori consultants par Direct 15,000.00 0.00 Annulé 2020-12-11 2020-12-21 2021-01-12 2021-02-16 du Cadre de Politique de the border areas entente directe Réinstallation (CPR) + Cadre de Planification en faveur des Peuples Autochtones (CPPA) BI-BI-MOF-246029-CS-CDS / Entente directe avec Implementation support, Sélection de Madame Clotilde NIZIGAMA, IDA / V0960 Communication, Monitoring, A posteriori consultants par Direct 26,000.00 33,246.84 Signé 2021-07-30 2021-07-28 2021-08-09 2021-09-03 2021-10-13 2021-05-11 2021-11-01 Coordonnateur du projet pour and Evaluation entente directe l'Actualisation du contrat BI-BI-MOF-246032-CS-CDS / Entente directe avec Mr Implementation support, Sélection de BATUNGWANAYO Léonidas, IDA / V0960 Communication, Monitoring, A posteriori consultants par Direct 21,600.00 30,476.27 Signé 2021-07-30 2021-07-29 2021-08-09 2021-09-02 2021-10-13 2021-07-26 2022-04-30 Responsable Administratif et and Evaluation entente directe Financier pour l'Actualisation du contrat BI-BI-MOF-246034-CS-CDS / Entente directe avec Monsieur Cyprien Implementation support, Sélection de BARAMBONERANYE, IDA / V0960 Communication, Monitoring, A posteriori consultants par Direct 24,700.00 27,710.10 Signé 2021-07-30 2021-07-29 2021-08-09 2021-09-02 2021-10-13 2021-05-28 2022-04-30 Responsable de la Passation and Evaluation entente directe des Marchés pour l'actualisation du contrat BI-BI-MOF-246037-CS-CDS / Entente directe avec Mr Implementation support, Sélection de BIREHANISENGE Adophe, IDA / V0960 Communication, Monitoring, A posteriori consultants par Direct 24,800.00 30,224.40 Signé 2021-07-30 2021-07-29 2021-08-09 2021-09-03 2021-10-13 2021-05-28 2022-04-30 Expert en Facilitation du and Evaluation entente directe Commerce et Secteur Privé pour l'actualisation du contrat BI-BI-MOF-246040-CS-CDS / Entente directe avec Implementation support, Sélection de Madame KABURA Marie Rose, IDA / V0960 Communication, Monitoring, A posteriori consultants par Direct 19,800.00 27,705.70 Signé 2021-07-30 2021-07-29 2021-08-09 2021-09-03 2021-10-13 2021-07-20 2022-04-30 Responsable des Sauvegardes and Evaluation entente directe environnementales pour l'actualisation du contrat BI-BI-MOF-246044-CS-CDS Implementation support, Sélection de / Entente directe avec Mr IDA / V0960 Communication, Monitoring, A posteriori consultants par Direct 19,800.00 27,705.70 Signé 2021-07-30 2021-07-29 2021-08-09 2021-09-02 2021-10-13 2021-06-07 2022-04-30 César Abel MAYELE pour and Evaluation entente directe l'actualisation du contrat BI-BI-MOF-246046-CS-CDS Implementation support, Sélection de / Entente directe avec IDA / V0960 Communication, Monitoring, A posteriori consultants par Direct 17,700.00 16,623.42 Signé 2021-07-30 2021-07-28 2021-08-09 2021-09-03 2021-10-13 2021-06-30 2022-04-30 Madame NIYOKINDI Consolée and Evaluation entente directe pour l'actualisation du contrat BI-BI-MOF-253433-CS-INDV Implementation support, En cours / Réalisation d'une enquête de IDA / V0960 Communication, Monitoring, A posteriori Individuel Open 45,000.00 0.00 2021-09-17 2021-09-17 2021-10-29 2021-11-05 2021-11-16 2022-05-15 d'exécution base dans la zone du PFCIGL and Evaluation BI-BI-MOF-257902-CS-INDV / Entente Directe avec Monsieur Denis NDIKUMANA pour l'Élaboration du PAR Component 2: Improvements En attente IDA / V3250 A posteriori Individuel Direct 12,000.00 0.00 2021-10-25 2021-11-04 2021-11-15 2021-11-21 2021-12-31 pour la construction du port to Core Trade Infrastructure d'exécution de Rumonge et l’actualisation du PAR pour le poste frontière de Gatumba BI-BI-MOF-262743-CS-CDS / Entente Directe avec la firme CHEMAS pour l'élaboration de Sélection de l'EIES/PGES et du PAR de la Component 2: Improvements En attente IDA / V3250 A posteriori consultants par Direct 420,000.00 0.00 2021-11-15 2021-11-19 2022-01-14 2022-02-28 RN3, projet pilote TNM, du to Core Trade Infrastructure d'exécution entente directe Boulevard NDADAYE et du Contournement Ouest de Bujumbura pour le PRT BI-BI-MOF-262749-CS-CDS / Entente Directe avec la firme CHEMAS pour l'assistance technique en sauvegardes environnementales et sociales Sélection de Component 2: Improvements En attente et la préparation des dossiers IDA / V3250 A posteriori consultants par Direct 300,000.00 0.00 2021-11-15 2021-11-21 2022-01-05 2022-03-15 to Core Trade Infrastructure d'exécution du Cadre Environnemental et entente directe Social pour PRT et le contrôle qualité des documents de sauvegarde du PFCIGL Page 4