Procurement Plan for Andhra Pradesh and Telengana Municipal
                          Development Project

I.         General

1.         Project information:

          Country                              :   India
          Borrower                             :   Republic of India
          Project Name                         :   AP & Telengana Municpal Development Project
          Loan No.                             :
          Project Implementing Agency          :   CDMA – TMDP, APMDP
          (PIA), etc.

2.       Bank’s approval Date of the procurement Plan Original : Oct 3, 2009

3.      Date of General Procurement Notice: Published

4.      Period covered by this procurement plan: Current


II.      Goods and Works and non-consulting services

1.       Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as
         stated in Appendix 1 to the Guidelines for Procurement.

World Bank review of procurement: The World Bank will prior review (thresholds are based on
“Substantial” rating, will be modified if risk rating is changed after assessment by Bank during
the project implementation) the following contracts:
         a) Works including turnkey Supply & Installation of Plant and Equipment and PPP: All
            contracts more than US$ 10 million equivalent

         b) Goods, Information Technology and Non-consulting Services: All contracts more than
            US$ 2 million equivalent

First contract issued by implementing agency [IA] will be subject to prior review irrespective of
their value. In addition, the justifications for all contracts to be issued on the basis of LIB, single-
source or direct contracting will be subject to prior review. The above thresholds are for the initial
18 months implementation period; based on the procurement performance of the project these
thresholds may be subsequently modified by Bank. In case of Post Review contracts, the inputs
of Bank on Technical Specifications will be obtained by project. The procurement plan will be
subsequently updated annually (or at any other time if required) and will reflect any change in
prior review thresholds. The World Bank will carry out an annual ex-post procurement review of
the procurement falling below the prior review thresholds provided above. To avoid any doubts,
the Bank may conduct at any time Independent Procurement Reviews (IPRs) of all the contracts
financed under the loan. Domestic preference is allowed only for Procurement of Goods and
Information Technology and not for procurement of Works.


                                                                                      Method Threshold
      Category                   Method of Procurement
                                                                                       (US$ Equivalent)
     Works            International Competitive Bidding (ICB)                  > 40,000,000
                                                                               Up to 40,000,000 (with NCB
                      National Competitive Bidding (NCB)
                                                                               conditions)
                      Shopping                                                 Up to 100,000
                                                                               As per paragraph 3.7 of
                      Direct Contracting (DC)
                                                                               Guidelines
                      Public-Private Partnership (PPP) for                     As per paragraph 3.14 of
                      Works                                                    Guidelines
                                                                               As per paragraph 3.9 of
                      Force Account
                                                                               Guidelines
                                                                               As per paragraph 3.6 of
                      Framework Agreement (FA)
                                                                               Guidelines
     Goods and        International Competitive Bidding (ICB)                  > 3,000,000
     non-             Limited International Bidding (LIB)                      wherever agreed by Bank
     consultant       National Competitive Bidding (NCB)                       Up to 3,000,000 (with NCB
     services                                                                  conditions)
     (NCS)            Shopping                                                 Up to 100,000
                      Direct Contracting (DC)                                  As per paragraph 3.7 of
                                                                               Guidelines
                      Public-Private Partnership (PPP) Services                As per paragraph 3.14 of
                                                                               Guidelines
                      Force Account (only for NCS)                             As per paragraph 3.9 of
                                                                               Guidelines
                      Framework Agreement (FA)1                                As per paragraph 3.6 of
                                                                               Guidelines
                      Procurement from United Nations (UN)                     As per paragraph 3.10 of
                      Agencies                                                 Guidelines


2.        Prequalification. Pre-qualification is not envisaged for any package under the Project.

3.        Proposed Procedures for CDD Components (as per paragraph. 3.17 of the
          Guidelines: Not Applicable

4.        Reference to (if any) Project Implementation Plan: Not Applicable


1/   DGS&D rate contracts may be used as framework agreement (FA) subject to the conditions mentioned under NCB conditions
5.   Retroactive Financing : As per LA.

6.   NCB Condition: National competition for the procurement of goods and works
     according to the established thresholds will be conducted in accordance with paragraphs
     3.3 & 3.4 of Section III of the Guidelines and the following provisions:

     a) Only the model bidding documents for NCB agreed with the GoI Task Force (and as
        amended from time to time), shall be used for bidding;

     b) Invitations to bid shall be advertised in at least one widely circulated national daily
        newspaper (or on a widely used website or electronic portal with free national and
        international access along with an abridged version of the said advertisement published
        in a widely circulated national daily inter-alia giving the website/electronic portal
        details from which the details of the invitation to bid can be downloaded), at least 30
        days prior to the deadline for the submission of bids;

     c) No special preference will be accorded to any bidder either for price or for other terms
        and conditions when competing with foreign bidders, state-owned enterprises, small-
        scale enterprises or enterprises from any given State;

     d) Except with the prior concurrence of the Bank, there shall be no negotiation of price
        with the bidders, even with the lowest evaluated bidder;

     e) Extension of bid validity shall not be allowed with reference to Contracts subject to
        Bank prior review without the prior concurrence of the Bank (i) for the first request for
        extension if it is longer than four weeks; and (ii) for all subsequent requests for
        extension irrespective of the period (such concurrence will be considered by Bank only
        in cases of Force Majeure and circumstances beyond the control of the
        Purchaser/Employer);

     f) Re-bidding shall not be carried out with reference to contracts subject to Bank prior
        review without the prior concurrence of the Bank. The system of rejecting bids outside
        a pre-determined margin or "bracket" of prices shall not be used in the project;

     g) Rate contracts entered into by Directorate General of Supplies and Disposals (DGS&D)
        will not be acceptable as a substitute for NCB procedures unless agreed with the Bank
        on case to case basis. Such contracts will be acceptable however for any procurement
        under the Shopping procedures;


     h)   Use of DGS&D rate contracts as Framework Agreement must be reflected in the
          procurement plan agreed by the Bank for particular goods. Before issuing the purchasing
          order, the Bank will have to advise the government on carrying out a price analysis on the
          specific good that is intended to be purchased. If after this due diligence the borrower
          concludes [and Bank agrees] that the DGS&D rate contract is not suitable, then the borrower
          will have to proceed using NCB or shopping depending on the value. To meet the Bank's
          requirements for right to audit and F&C, these clauses may be included in the Purchase
               Orders [in case the purchasers are directly placing the purchase orders to DGS&D rate
               contract holders]. On the other hand, if indent is placed through DGS&D, the Purchaser has
               the option to sign a separate undertaking with DGS&D rate contract holder, where Bank’s
               right to audit and F&C clauses could be mentioned.
          i) Two or three envelope system will not be used (except when using e-procurement
             system assessed and agreed by the Bank).

7.        Procurement Packages with Methods and Time Schedule as per procurement plan in
          STEP

III.      Selection of Consultants

1.      Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in
        Appendix 1 to the Guidelines Selection and Employment of Consultants:

       a) Consultancy Services for selection of firms : All contracts more than US$ 1.0 million
       equivalent;
       b) Consultancy services for selection of individuals: All contracts above US$ 0.3 million.
       c) First contract issued by implementing agency [IA] will be subject to prior review
       irrespective of their value. In addition, the justifications for all contracts to be issued on the
       basis of single-source or direct contracting will be subject to prior review. The above thresholds
       are for the initial 18-month implementation period; based on the procurement performance of
       the project these thresholds may be subsequently modified by Bank. In case of Post Review
       contracts, the inputs of Bank on TORs will be obtained by project. The procurement plan
       will be subsequently updated annually (or at any other time if required) and will reflect any
       change in prior review thresholds. The World Bank will carry out an annual ex-post
       procurement review of the procurement falling below the prior review thresholds provided
       above. To avoid any doubts, the Bank may conduct at any time Independent Procurement
       Reviews (IPRs) of all the contracts financed under the loan.
                     Selection Method                                         Method Threshold (USD)
     Consultants’    Selection Based on Consultants’ Qualifications           Up to 300,000
     Services        (CQS)/Least-Cost Selection (LCS)
                     Single-Source Selection (SSS)                            As per paragraphs 3.9-3.11
                                                                              of Guidelines
                     Individuals                                              As per Section V of
                                                                              Guidelines
                     Particular Types of Consultants                          As per paragraphs 3.15-
                                                                              3.21 of Guidelines
                     Quality- and Cost-Based Selection (QCBS)/ Quality-       for all other cases
                     Based Selection (QBS)/ Selection under a Fixed Budget
                     (FBS)
                     (i) International shortlist                              > 800,000
                     (ii) Shortlist may comprise national consultants only    Up to 800,000
2.   Short list comprising entirely of national consultants: Short list of consultants for services,
     estimated to cost less than US $ 800,000 equivalent per contract, may comprise entirely of
     national consultants in accordance with the provisions of paragraph 2.7 of the Consultant
     Guidelines.

3.   Any Other Special Selection Arrangements:
     First consultancy selection shall be prior reviewed irrespective of threshold.
     Refer to sl. No. 4 under Section-II of the procurement plan

4.   Consultancy Assignments with Selection Methods and Time Schedule as per
     procurement plan in STEP
PROCUREMENT
                    India : ANDHRA PRADESH AND TELANGANA MUNICIPAL DEVELOPMENT PROJECT
PLAN
General Information
Country:               India                               Banks Approval Date of the Original Procurement Plan:          2016-11-10
                                                           Revised Plan Date(s): (comma delineated, leave blank if none) 2017-10-23
Project ID:            P071250                             GPN Date:
Project Name:          ANDHRA PRADESH AND TELANGANA MUNICIPAL DEVELOPMENT PROJECT
Loan / Credit No:      IBRD / 78160
Executing Agency(ies): Andhra Pradesh Municipal Corporation, Commissioner and Director Municipal Administration Gov. Telangana


WORKS
  Activity Reference No. /                                                                                                                                                                                                                                                                                                                                                                        Bid Evaluation Report
                                                                                                                                                    Procurement       Prequalification    Estimated        Actual Amount       Process        Draft Pre-qualification     Prequalification   Draft Bidding Document Specific Procurement         Bidding Documents as   Proposal Submission /
         Description             Loan / Credit No.           Component                   Review Type        Method        Market Approach                                                                                                                                                                                                                                                         and Recommendation           Signed Contract        Contract Completion
                                                                                                                                                      Process             (Y/N)          Amount (US$)          (US$)            Status             Documents             Evaluation Report        / Justification     Notice / Invitation               Issued            Opening / Minutes
                                                                                                                                                                                                                                                                                                                                                                                                        for Award
                                                                                                                                                                                                                                              Planned       Actual      Planned     Actual    Planned      Actual      Planned       Actual      Planned     Actual     Planned       Actual      Planned       Actual      Planned       Actual      Planned      Actual
 AEE/229/TU/TMDP/WSSI/2016
/ Comprehensive Water Supply                                                                                                                     Single Stage - One
                             IBRD / 78160            Urban infrastruture investment   Prior            Request for Bids   Open - National                                                   7,883,333.00     12,922,244.78   Signed                                                          2016-11-11   2016-11-10   2016-11-12                                       2016-11-13   2016-10-26   2016-12-13   2017-08-18   2017-01-17   2017-04-29   2018-01-17
Service Improvements in                                                                                                                          Envelope
Huzurabad Nagar Panchayat


 AEE/230/TU/TMDP/WSSI/2016
/ Comprehensive Water Supply                                                                                                                     Single Stage - One
                              IBRD / 78160           Urban infrastruture investment   Prior            Request for Bids   Open - National                                                   5,783,333.00      5,676,273.16   Signed                                                          2016-11-15   2016-11-10   2016-11-16   2017-08-11                          2016-11-17   2016-05-17   2016-11-18   2017-08-18   2016-12-10   2016-11-19   2017-12-10
Service Improvement Scheme in                                                                                                                    Envelope
Jammikunta NP


AEE/232/TU/TMDP/KOLLAPUR/
2016 / Comprehensive Water
                                                                                                                                                 Single Stage - One
Supply Service Improvement IBRD / 78160              Urban infrastruture investment   Prior            Request for Bids   Open - National                                                   5,955,000.00      5,930,022.02   Signed                                                          2016-11-10   2016-11-10   2016-11-11   2016-11-11                          2016-11-12                2016-11-13   2017-02-20   2016-12-18   2017-04-18   2017-12-18
                                                                                                                                                 Envelope
Scheme in Kollapur Nagar
Panchayat


AEE/231/TU/TMDP/WSSI/MEDA
K/2016 / Comprehensive Water                                                                                                                     Single Stage - One
                             IBRD / 78160            Urban infrastruture investment   Prior            Request for Bids   Open - National                                                   7,273,333.00      6,741,746.55   Signed                                                          2016-11-10   2016-11-10   2016-11-11   2017-01-10                          2016-11-12   2017-01-02   2016-11-13   2017-01-31   2016-12-05   2016-11-25   2017-12-05
Supply Service Improvement                                                                                                                       Envelope
Scheme in Medak Municipality


AEE/233/TU/TMDP/WSSI/KOTH
AGUDEM/2016 / Comprehensive
                                                                                                                                                 Single Stage - One
Water Supply Improvement    IBRD / 78160             Urban infrastruture investment   Prior            Request for Bids   Open - National                                                   6,451,667.00      6,370,526.21   Signed                                                          2016-11-10   2016-11-10   2016-11-11   2016-11-11                          2016-11-12                2016-11-13   2017-02-02   2016-12-18   2017-03-20   2017-12-18
                                                                                                                                                 Envelope
scheme in Kothagudem
Municipality


 84/PS/ATP/APMDP/2015 /
APMDP-Comprehensive water
                                                                                                                                                 Single Stage - One                                                          Under
supply improvement scheme in     IBRD / 78160        Urban infrastruture investment   Prior            Request for Bids   Open - National                                                  22,975,593.00              0.00                                                                   2016-11-11                2016-11-12   2017-02-01                          2016-11-13   2017-01-19   2016-11-14                2016-11-16                2018-11-16
                                                                                                                                                 Envelope                                                                    Implementation
Ananthapuram Municipal
Corporation Package-I




GOODS
  Activity Reference No. /                                                                                                                                                                                                                                                                                                                                                                        Bid Evaluation Report
                                                                                                                                                    Procurement       Prequalification    Estimated        Actual Amount       Process        Draft Pre-qualification     Prequalification   Draft Bidding Document Specific Procurement         Bidding Documents as   Proposal Submission /
         Description             Loan / Credit No.           Component                   Review Type        Method        Market Approach                                                                                                                                                                                                                                                         and Recommendation           Signed Contract        Contract Completion
                                                                                                                                                      Process             (Y/N)          Amount (US$)          (US$)            Status             Documents             Evaluation Report        / Justification     Notice / Invitation               Issued            Opening / Minutes
                                                                                                                                                                                                                                                                                                                                                                                                        for Award
                                                                                                                                                                                                                                              Planned       Actual      Planned     Actual    Planned      Actual      Planned       Actual      Planned     Actual     Planned       Actual      Planned       Actual      Planned       Actual      Planned      Actual
 Folder 42 / Procurement of                          State level policy and
Development of Information and                       institutional development
Communication Technology                             Front end Fee
                                                                                                                                                 Single Stage - One
(ICT)enable integrated online  IBRD / 78160          Project management support       Prior            Request for Bids   Open - National                             N                     6,320,000.00      3,967,651.34   Signed                                                                                                                                                                            2016-06-17                2016-01-23
                                                                                                                                                 Envelope
building permission management                       Urban infrastruture investment
system in the State of Andhra                        Municipal capacity
Pradesh                                              enhancement


                                                     State level policy and
 Folder 49 / Selection of System
                                                     institutional development
Integration Services for the
                                                     Front end Fee
Implementation of e-Governance                                                                                                                   Single Stage - One
                                 IBRD / 78160        Project management support       Prior            Request for Bids   Open - International                        N                             0.00      5,296,184.33   Signed                                                                                                                                                                            2016-06-17                2016-05-18
Solution in 110 Urban Local                                                                                                                      Envelope
                                                     Urban infrastruture investment
Bodies of Andhra Pradesh-
                                                     Municipal capacity
1970/EGOV/APMDP/2013/02
                                                     enhancement


                                                     State level policy and
 Folder 50 / Cloud Service
                                                     institutional development
Provider for the Implementation of
                                                     Front end Fee
e-Governance Solution in 110                                                                                                                     Single Stage - One
                                   IBRD / 78160      Project management support       Prior            Request for Bids   Open - National                             N                   100,000,000.00        505,129.01   Signed                                                                                                                                                                            2016-06-17                2016-05-18
Urban Local Bodies of Andhra                                                                                                                     Envelope
                                                     Urban infrastruture investment
Pradesh-
                                                     Municipal capacity
1970EGOV/APMDP/2013/01
                                                     enhancement


 Folder 48 / Procure, Design,                        State level policy and
Customize/ Develop, Supply,                          institutional development
Commission, Implement and                            Front end Fee
                                                                                                                                                 Single Stage - One                                                          Under
Maintain e-Governance            IBRD / 78160        Project management support       Prior            Request for Bids   Open - International                        N                             0.00      6,406,279.89                                                                                                                                                                                     2016-06-17
                                                                                                                                                 Envelope                                                                    Implementation
Application for 69 Urban Local                       Urban infrastruture investment
Bodies in Telangana -                                Municipal capacity
2315/EGOV/TMDP/2015                                  enhancement


AEE/215/TU/TMDP/PWM/ARMO
OR/P-II/2015 / Supply and
installation of Bulk and Comestic
                                                                                                                                                 Single Stage - One                                                          Under
/ Commercial Water Meters         IBRD / 78160       Urban infrastruture investment   Post             Request for Bids   Open - National                                                    720,533.00               0.00                                                                   2016-12-02                2016-12-07   2017-10-21                          2017-01-18                2017-02-17                2017-03-24                2017-09-20
                                                                                                                                                 Envelope                                                                    Implementation
including Water Audit, O& M for
a period of 5 yeasr in I Armoor
Municipality- Package 2


1439/PS/SOFTWARE-
HARDWARE/APMDP/2015 /
APMDP-The Procurement of GIS
                                                     Municipal capacity                                                                          Single Stage - One                                                          Under
Software (Desktop Version), CAD IBRD / 78160                                          Post             Request for Bids   Open - National                                                    237,500.00               0.00                                                                   2016-11-10   2017-01-18   2016-11-11                                       2016-11-12                2016-11-27                2017-01-01                2017-01-31
                                                     enhancement                                                                                 Envelope                                                                    Implementation
Software MAP 3D and
Procurement of Geospatial
Software Server


MAE/235/TU/TMDP/XEROX/2016
/ Procurement of xerox machine
                                                                                                       Request for                               Single Stage - One                                                          Pending
for the Telangana Municipal      IBRD / 78160        Project management support       Post                                Limited                                                               2,537.50              0.00                                                                                             2017-01-24                                                                                           2017-03-21                2017-09-17
                                                                                                       Quotations                                Envelope                                                                    Implementation
Development project in technical
unit official use of TMDP




                                                                                                                                                                                                                                                   Page 1
T1/140/TU/TMDP/GIS/CED/2016/
VOL-III / Assignment No.20 -
                                                      Municipal capacity                                Request for                                Single Stage - One                                                             Pending
Preparation of GIS Base Maps    IBRD / 78160                                           Post                                 Limited                                                                2,900.00                0.00                                                                                                  2017-01-19                                                                                              2017-03-16                2017-09-12
                                                      enhancement                                       Quotations                                 Envelope                                                                       Implementation
for 59 ULBs - GTS PBM location
with height control information


AEE/210/TU/TMDP/PWM/MALK
AJGIRI-PK-II / Supply,Delivery of
Bulk and Domestic AMR Water
                                                                                                                                                   Single Stage - One
Meters for Comprehensive Water IBRD / 78160           Urban infrastruture investment   Prior            Request for Bids    Open - International                                              14,300,000.00                0.00   Under Review                                                         2016-12-14   2017-04-18   2016-12-19   2017-06-01                             2017-01-30   2017-06-05   2017-03-01                2017-04-05                2017-10-02
                                                                                                                                                   Envelope
Supply Service Improvement
Scheme in Malkajgiri under
TMDP


 14021/6/2017/PS / SUpply of
wooden cots and accessories
                                                      Municipal capacity                                Request for                                Single Stage - One                                                             Pending
for the use of Project Director   IBRD / 78160                                         Post                                 Limited                                                                 895.00                 0.00                                                                                                  2017-05-07                                                                                              2017-07-02                2017-07-17
                                                      enhancement                                       Quotations                                 Envelope                                                                       Implementation
and Addl.Project
Director,APMDP


 APMDP-14021/16/2016-PS /
Supply of Modular furniture &                         Municipal capacity                                Request for                                Single Stage - One                                                             Under
                               IBRD / 78160                                            Post                                 Limited                                                              17,799.90                 0.00                                                                                                  2017-05-02   2017-05-01                                                                                 2017-05-03                2017-05-31
conference tables to the APMDP                        enhancement                                       Quotations                                 Envelope                                                                       Implementation
office-Reg.


14021/1/2017-PS /APMDP /
Procurement of LCD
                                                      Municipal capacity                                Request for                                Single Stage - One                                                             Pending
Projectors,Smart TV ,             IBRD / 78160                                         Post                                 Limited                                                                4,416.60                0.00                                                                                                  2017-05-02                                                                                              2017-05-03                2017-05-10
                                                      enhancement                                       Quotations                                 Envelope                                                                       Implementation
Refrigerator and 10KVA online
UPS to the office of APMDP


 APMDP/14021/2/PS/2017 /
APMDP - Supply of small
EPABX System and its cabling                          Municipal capacity                                Request for                                Single Stage - One                                                             Pending
                                  IBRD / 78160                                         Post                                 Limited                                                                5,540.00                0.00                                                                                                  2017-05-27                                                                                              2017-07-22                2017-07-29
accessoriesl for the use of                           enhancement                                       Quotations                                 Envelope                                                                       Implementation
APMDP, New Office @ Reddy
Palem, Guntur-Reg.


APMDP/14021/8/PS/DESKTOP/
2016 / Procurement of High end                        Municipal capacity                                Request for                                Single Stage - One                                                             Under
                               IBRD / 78160                                            Post                                 Limited                                                                2,491.66                0.00                                                                                                  2017-06-26                                                                                              2017-08-21                2017-08-28
Desktop to Project Director,                          enhancement                                       Quotations                                 Envelope                                                                       Implementation
chamber, APMDP, Guntur


14021/14/2017/PS/NAME
PLATES / APMDP-Providing                              Municipal capacity                                Request for                                Single Stage - One                                                             Pending
                                  IBRD / 78160                                         Post                                 Limited                                                                 458.33                 0.00                                                                                                  2017-06-10                                                                                              2017-08-05                2017-08-12
Main Board and Officers Name                          enhancement                                       Quotations                                 Envelope                                                                       Implementation
Plates-Reg.


AEE/224/TU/TMDP/PWM/MANU
GURU/PK-II/2015 / Providing of
Bulk & Domestic water meters
with Maintenance, Water audit
for a period of 5 years under                                                                                                                      Single Stage - One                                                             Under
                               IBRD / 78160           Urban infrastruture investment   Post             Request for Bids    Open - National                                                     133,092.31                 0.00                                                                        2017-06-15   2017-08-03   2017-06-20                                          2017-08-01                2017-08-31                2017-10-05                2018-04-03
TMDP with World Bank                                                                                                                               Envelope                                                                       Implementation
assistance (Package-II) in
Manuguru Municipality,
Bhadradri Kothagudem District,
Telangana St


APMDP/14021/7/PS/2017 /
APMDP - Supply of three                               Municipal capacity                                Request for                                Single Stage - One                                                             Pending
                                    IBRD / 78160                                       Post                                 Limited                                                                1,316.66                0.00                                                                                                  2017-07-02                                                                                              2017-08-13                2017-08-20
Executive chairs to the officers of                   enhancement                                       Quotations                                 Envelope                                                                       Implementation
APMDP


1276/PS/BDVL/APMDP/2017 /
Comprehensive Water Supply
Services Scheme in Badvel                             Municipal capacity                                                                           Single Stage - Two                                                             Pending
                                  IBRD / 78160                                         Prior            Request for Bids    Open - International                                               5,500,000.00                0.00                                                                        2017-09-11                2017-09-16                                          2017-10-28                2018-01-10                2018-02-14                2018-08-13
Municipality-Package-II(Bulk                          enhancement                                                                                  Envelope                                                                       Implementation
meters and Consumer water
meters)




NON CONSULTING SERVICES
  Activity Reference No. /                                                                                                                                                                                                                                                                                                                                                                                     Bid Evaluation Report
                                                                                                                                                       Procurement      Prequalification     Estimated         Actual Amount        Process        Draft Pre-qualification      Prequalification       Draft Bidding Document Specific Procurement         Bidding Documents as      Proposal Submission /
         Description              Loan / Credit No.           Component                   Review Type        Method         Market Approach                                                                                                                                                                                                                                                                    and Recommendation           Signed Contract        Contract Completion
                                                                                                                                                         Process            (Y/N)           Amount (US$)           (US$)             Status             Documents              Evaluation Report            / Justification     Notice / Invitation               Issued               Opening / Minutes
                                                                                                                                                                                                                                                                                                                                                                                                                     for Award
                                                                                                                                                                                                                                                   Planned        Actual      Planned      Actual       Planned      Actual      Planned       Actual      Planned       Actual      Planned       Actual      Planned       Actual      Planned       Actual      Planned      Actual




CONSULTING FIRMS
  Activity Reference No. /                                                                                                                                                                                                                                                                                                                                                                        Combined Evaluation
                                                                                                                                                       Contract Type     Estimated          Actual Amount                                                        Expression of Interest    Short List and Draft     Request for Proposals     Opening of Technical      Evaluation of Technical
         Description              Loan / Credit No.           Component                   Review Type        Method         Market Approach                                                                   Process Status        Terms of Reference                                                                                                                                              Report and Draft           Signed Contract        Contract Completion
                                                                                                                                                                        Amount (US$)            (US$)                                                                  Notice             Request for Proposals          as Issued            Proposals / Minutes             Proposal
                                                                                                                                                                                                                                                                                                                                                                                                  Negotiated Contract
                                                                                                                                                                                                                                    Planned         Actual       Planned       Actual     Planned        Actual     Planned       Actual      Planned       Actual      Planned       Actual      Planned      Actual       Planned       Actual      Planned       Actual
 Folder # 34 / RFP 28: Urban                          State level policy and
Reforms Cell for Undertaking                          institutional development
Studies and Coordinating the                          Front end Fee
                                                                                                        Quality And Cost-
Implementation of same on      IBRD / 78160           Project management support       Prior                                Open - International   N                                0.00        226,221.43    Signed                                                                                                                                                                                           2014-11-03                2014-12-06
                                                                                                        Based Selection
Municipal Reforms in Areas of                         Urban infrastruture investment
Poverty Reduction and Capacity                        Municipal capacity
Building of the ULBs                                  enhancement


 Folder # 33 / RFP 27 Urban                           State level policy and
Reforms Cell for in Areas of                          institutional development
Service Delivery, Regulatory                          Front end Fee
                                                                                                        Quality And Cost-
Activities and Poverty Reduction IBRD / 78160         Project management support       Prior                                Open - International   N                                0.00        824,731.68    Canceled                                                                                                                                                                                         2014-06-30
                                                                                                        Based Selection
with Special Focus on Financial                       Urban infrastruture investment
Improvement and Capacity                              Municipal capacity
Building of the ULBs                                  enhancement


148/PS/GIS/APMDP/2016 /
Package I,Preparation of GIS                          Municipal capacity                                Quality And Cost-                                                                                     Under
                                  IBRD / 78160                                         Prior                                Open - National                                  1,023,333.00             0.00                         2016-11-10                    2016-11-11               2016-11-13                                          2016-11-14                2016-11-15                2016-11-26                2016-12-31                2017-06-29
Base Maps in Visakhapatnam                            enhancement                                       Based Selection                                                                                       Implementation
Region


 MAE/236/TU/TMDP/TPQA/5
ULBS/2016 / Procurement of
consultancy services for Third                                                                          Quality And Cost-
                                  IBRD / 78160        Project management support       Post                                 Open - National                                   270,000.00        407,430.66    Signed               2016-11-09      2016-08-26    2016-11-10               2016-12-24   2017-01-12                             2017-01-21   2017-02-18   2017-03-22   2017-03-03   2017-05-05   2017-04-06   2017-06-09   2017-05-03   2018-06-09
Party Qaulity Auditand Project                                                                          Based Selection
Monitoring unit in 5 ULBs of
Telangana




                                                                                                                                                                                                                                                        Page 2
 MAE/238/TU/TMDP/MASTER
PLANS/2016 / Procurement of                                                               Quality And Cost-                                              Under
                                 IBRD / 78160    Urban infrastruture investment   Post                        Open - International   901,271.00   0.00                    2016-12-14   2017-02-02    2017-01-04   2017-06-17   2017-02-17   2017-09-15   2017-03-17   2017-04-16   2017-05-21   2017-06-25   2018-06-25
consultancy for Preparation of                                                            Based Selection                                                Implementation
Master plan


MAE/239/TU/TMDP/GIS IN O/O
                                                 Municipal capacity                       Quality And Cost-                                              Pending
ENE-PH/2016 / Establishment of IBRD / 78160                                       Post                        Open - National        191,666.00   0.00                    2016-12-29                 2017-01-19                2017-03-04                2017-04-01   2017-05-01   2017-06-05   2017-07-10   2017-10-08
                                                 enhancement                              Based Selection                                                Implementation
GIS Cell in office of ENC- PH


148/PS/GIS-II/APMDP/2015 /
Package II-Preparation of GIS                    Municipal capacity                       Quality And Cost-                                              Under
                              IBRD / 78160                                        Prior                       Open - National        995,000.00   0.00                    2016-11-10                 2016-11-11                2016-11-13                2016-11-14   2016-11-15   2016-11-26   2016-12-31   2017-06-29
Base Maps in Ananthpuram and                     enhancement                              Based Selection                                                Implementation
Kurnool


148/PS/GIS-IV/APMDP/2015 /
                                                 Municipal capacity                       Quality And Cost-                                              Under
Package-IV Preparation of GIS  IBRD / 78160                                       Prior                       Open - National        786,667.00   0.00                    2016-11-10                 2016-11-11                2016-11-13                2016-11-14   2016-11-15   2016-11-26   2016-12-31   2017-06-29
                                                 enhancement                              Based Selection                                                Implementation
Base Maps in Ongole and Guntur


148/PS/GIS-V/APMDP/2015 /
                                                 Municipal capacity                       Quality And Cost-                                              Under
Package V, Preparation of GIS    IBRD / 78160                                     Prior                       Open - National        628,333.00   0.00                    2016-11-10                 2016-11-11                2016-11-13                2016-11-14   2016-11-15   2016-11-26   2016-12-31   2017-06-29
                                                 enhancement                              Based Selection                                                Implementation
Base Maps in Kadapa region


148/PS/GIS-VI/APMDP/2015 /
                                                 Municipal capacity                       Quality And Cost-                                              Under
Package VI,Preparation of GIS    IBRD / 78160                                     Post                        Open - National        456,667.00   0.00                    2016-11-10                 2016-11-11                2016-11-13                2016-11-14   2016-11-15   2016-11-26   2016-12-31   2017-06-29
                                                 enhancement                              Based Selection                                                Implementation
Base Maps in CRDA Region


 14021/4/PS/APMDP/1/2017 /
Consultancy services for
updation of revenue database and
rationalisation of house                         Municipal capacity                       Quality And Cost-                                              Under
                                 IBRD / 78160                                     Post                        Open - National        580,168.00   0.00                    2017-01-26   2017-06-21    2017-01-26                2017-03-12                2017-04-09   2017-05-09   2017-06-13   2017-07-18   2018-01-14
numbering (including integration                 enhancement                              Based Selection                                                Implementation
& updation with GIS base map)in
respect of 30ulbs in AP-Package-
I(West Godavari)


 14021/4/PS/APMDP/III/2017 /
Consultancy Services for
updation of revenue data base
and rationalisation of house                     Municipal capacity                       Quality And Cost-                                              Pending
                                  IBRD / 78160                                    Post                        Open - National        303,333.00   0.00                    2017-01-26                 2017-02-26                2017-04-09                2017-05-07   2017-06-06   2017-07-11   2017-08-15   2018-02-11
numbering(including integration &                enhancement                              Based Selection                                                Implementation
updation with GIS Base maps) in
respect of 30 ULBs in AP-
Package-III(Vizainagaram)


 14021/4/PS/APMDP/IV/2017 /
Consultancy Services for
updation of revenue data base
and rationalisation of house                     Municipal capacity                       Quality And Cost-                                              Pending
                                  IBRD / 78160                                    Post                        Open - National        246,667.00   0.00                    2017-01-26                 2017-01-26                2017-03-12                2017-04-09   2017-05-09   2017-06-13   2017-07-18   2018-01-14
numbering(including integration &                enhancement                              Based Selection                                                Implementation
updation with GIS Base maps) in
respect of 30 ULBs in AP-
Package-IV(Srikakulam)


 14021/4/PS/APMDP/V/2017 /
Consultancy Services for
updation of revenue data base
and rationalisation of house                     Municipal capacity                       Quality And Cost-                                              Pending
                                  IBRD / 78160                                    Post                        Open - National        301,667.00   0.00                    2017-01-26                 2017-01-26                2017-03-12                2017-04-09   2017-05-09   2017-06-13   2017-07-18   2018-01-14
numbering(including integration &                enhancement                              Based Selection                                                Implementation
updation with GIS Base maps) in
respect of 30 ULBs in AP-
Package-V(East Godavari)


 14021/4/PS/APMDP/II/2017 /
Consultancy Services for
updation of revenue data base
and rationalisation of house                     Municipal capacity                       Quality And Cost-                                              Pending
                                  IBRD / 78160                                    Post                        Open - National        426,667.00   0.00                    2017-01-26                 2017-01-26                2017-03-12                2017-04-09   2017-05-09   2017-06-13   2017-07-18   2018-01-14
numbering(including integration &                enhancement                              Based Selection                                                Implementation
updation with GIS Base maps) in
respect of 30 ULBs in AP-
Package-II(Krishna & Guntur)


 15021/9/TU/APMDP/2016 /
Consultancy Services for
preparation of water supply
                                                 Municipal capacity                       Quality And Cost-                                              Under
,seeptage management and         IBRD / 78160                                     Post                        Open - National        326,466.66   0.00                    2017-04-17                 2017-04-17                2017-04-28                2017-04-28   2017-04-28   2017-04-28   2017-05-19   2017-08-17
                                                 enhancement                              Based Selection                                                Implementation
storm water drainage for Non-
Amrut ULBs in Prakasam
District,AP-Reg.


 15201/9/2016-TU/APMDP /
Consutlancy Services for
preparation of DPRs for Water                    Municipal capacity                       Quality And Cost-                                              Under
                                 IBRD / 78160                                     Post                        Open - National        325,967.00   0.00                    2017-04-17                 2017-04-17                2017-04-28                2017-05-26   2017-06-25   2017-07-30   2017-09-03   2017-12-02
Supply,Storm water drain and                     enhancement                              Based Selection                                                Implementation
Septagemanagement in Nellore
District of AP-Reg.


15021/9/TU/APMDP /
Consultancy Services for DPR
Preparaption of Water                            Municipal capacity                       Quality And Cost-                                              Under
                               IBRD / 78160                                       Post                        Open - National        319,200.00   0.00                    2017-04-17                 2017-04-17                2017-04-28                2017-05-26   2017-06-25   2017-07-30   2017-09-03   2017-12-02
Supply,Storm Water Drains and                    enhancement                              Based Selection                                                Implementation
Septage Management in Chittoor
Dt in AP-Reg.


15021/9/2016/TU/APMDP /
Consultancy Services for
Preparation of DPR for Water                     Municipal capacity                       Quality And Cost-                                              Under
                                IBRD / 78160                                      Post                        Open - National        350,233.33   0.00                    2017-04-18                 2017-04-18                2017-04-28                2017-05-26   2017-06-25   2017-07-30   2017-09-03   2017-12-02
Supply , Storm water drains and                  enhancement                              Based Selection                                                Implementation
Septage Management in Kadapa
District of AP-Reg.


 15021/9/TU/APMDP/2016-5 /
onsultancy Services for
Preparation of DPR for Water                     Municipal capacity                       Quality And Cost-                                              Under
                                IBRD / 78160                                      Post                        Open - National        526,016.00   0.00                    2017-04-18                 2017-04-18                2017-04-28                2017-05-26   2017-06-25   2017-07-30   2017-09-03   2017-12-02
Supply , Storm water drains and                  enhancement                              Based Selection                                                Implementation
Septage Management in
Ananthapur District of AP-Reg.


 15021/9/TU/APMDP/2016-6 /
onsultancy Services for
Preparation of DPR for Water                     Municipal capacity                       Quality And Cost-                                              Under
                                IBRD / 78160                                      Post                        Open - National        433,833.33   0.00                    2017-04-18                 2017-04-18                2017-04-28                2017-05-26   2017-06-25   2017-07-30   2017-09-03   2017-12-02
Supply , Storm water drains and                  enhancement                              Based Selection                                                Implementation
Septage Management in kurnool
District of AP-Reg.




                                                                                                                                                                                            Page 3
 148/GIS/PACKAGE-
VII/TU/APMDP / Consulting
Services for preparation of GIS
                                                 Municipal capacity                  Quality And Cost-                                              Pending
base maps (Balance work) for 44 IBRD / 78160                                  Post                       Open - International   610,000.00   0.00                    2017-05-08            2017-05-08                2017-05-08   2017-05-09   2017-05-09   2017-05-09   2017-06-13   2017-12-10
                                                 enhancement                         Based Selection                                                Implementation
ULBs and prepaaration of base
map for 36 ULBs of AP Package-
VII inRajhmundary &Vijayawada.


 148/GIS /P-III/APMDP/2017 /
Consulting Services for
preparation of GIS base maps
                                                 Municipal capacity                  Quality And Cost-                                              Pending
(Balance work) for 44 ULBs and    IBRD / 78160                                Post                       Open - International   951,667.00   0.00                    2017-05-08            2017-05-08                2017-05-08   2017-05-08   2017-05-09   2017-05-09   2017-06-13   2017-12-10
                                                 enhancement                         Based Selection                                                Implementation
prepaaration of base map for 36
ULBs of AP Package-III in
Nellore& Chitoor.


 MAE/248/TU/TMDP/IULR/2017-
18/P1 / SELECTION OF
CONSULTING SERVICES FOR
DEVELOPMENT OF
INTEGRATED URDAN LAND
REGISTRY FOR NIRMAL                                                                  Consultant
                                                                                                                                                    Under
MUNICIPALITY, BHAINSA       IBRD / 78160         Project management support   Post   Qualification       Open - National        277,769.23   0.00                    2017-06-05            2017-06-05   2017-06-17   2017-06-05                             2017-06-05   2017-06-26   2017-12-23
                                                                                                                                                    Implementation
MUNICIPALITY, ADILABAD                                                               Selection
MUNICIPALITY, BODHAN
MUNICIPALITY,ARMOOR
MUNICIPALITY, NIZAMABAD
MUNICIPAL CORPORATION,
KAMA REDDY - PACKAGE-1


 MAE/248/TU/TMDP/IULR/2017-
18/P2 / SELECTION OF
CONSULTING SERVICES FOR
DEVELOPMENT OF
INTEGRATED URDAN LAND
REGISTRY FOR JAMMIKUNTA
                                                                                     Consultant
NAGAR PANCHAYAT,                                                                                                                                    Under
                            IBRD / 78160         Project management support   Post   Qualification       Open - National        253,230.77   0.00                    2017-06-05            2017-06-26   2017-06-17   2017-08-09                             2017-09-08   2017-10-13   2018-04-11
HUZURABAD N.P,                                                                                                                                      Implementation
                                                                                     Selection
KARIMNAGAR MUNICIPAL
CORPORATION,JAGITIAL
MUNICIPALITY, KORUTLA ,
METPALLY VEMULAWADA
NAGAR PANCHAYAT, SIRCILLA
- PACKAGE-2


 MAE/248/TU/TMDP/IULR/2017-
18/P3 / SELECTION OF
CONSULTING SERVICES FOR
DEVELOPMENT OF
INTEGRATED URDAN LAND
REGISTRY FOR PEDDAPALLI                                                              Consultant
                                                                                                                                                    Under
NAGAR PANCHAYAT,            IBRD / 78160         Project management support   Post   Qualification       Open - National        248,769.23   0.00                    2017-06-05            2017-06-26   2017-06-17   2017-08-09                             2017-09-08   2017-10-13   2018-04-11
                                                                                                                                                    Implementation
RAMAGUNDAM MUNICIPAL                                                                 Selection
CORPORATION, MANCHIERAL
, BELLAMPALLY ,
MANDAMARRI MUNCIPALITY,
KHAGAZNAGAR MUNCIPALITY-
PACKAGE-3- REG


 MAE/248/TU/TMDP/IULR/2017-
18/P4 / SELECTION OF
CONSULTING SERVICES FOR
                                                                                     Consultant
DEVELOPMENT OF                                                                                                                                      Under
                            IBRD / 78160         Project management support   Post   Qualification       Open - National        177,384.61   0.00                    2017-06-05            2017-06-26   2017-06-17   2017-08-09                             2017-09-08   2017-10-13   2018-04-11
INTEGRATED URDAN LAND                                                                                                                               Implementation
                                                                                     Selection
REGISTRY FOR WARANGAL
MUNICIPAL CORPORATION
CIRCLE-1 - PACKAGE-4 -REG


 MAE/248/TU/TMDP/IULR/2017-
18/P5 / SELECTION OF
CONSULTING SERVICES FOR
DEVELOPMENT OF
INTEGRATED URDAN LAND
                                                                                     Consultant
REGISTRY FOR WARANGAL                                                                                                                               Under
                            IBRD / 78160         Project management support   Post   Qualification       Open - National        235,384.62   0.00                    2017-06-05            2017-06-26   2017-06-17   2017-08-09                             2017-09-08   2017-10-13   2018-04-11
MUNICIPAL CORPORATION,                                                                                                                              Implementation
                                                                                     Selection
PARKAL NAGAR PANCHAYAT,
NARSAMPET NAGAR
PANCHAYAT, BHUPALPALLY
NAGAR PANCHAYAT -
PACKAGE -5- REG


 MAE/248/TU/TMDP/IULR/2017-
18/P6 / SELECTION OF
CONSULTING SERVICES FOR
DEVELOPMENT OF
INTEGRATED URDAN LAND
REGISTRY FOR
                                                                                     Consultant
MAHABUBABAD ,                                                                                                                                       Under
                            IBRD / 78160         Project management support   Post   Qualification       Open - National        260,615.38   0.00                    2017-06-05            2017-06-26   2017-06-17   2017-08-09                             2017-09-08   2017-10-13   2018-04-11
KOTHAGUDEM ,PALWANCHA                                                                                                                               Implementation
                                                                                     Selection
, YELLANDU , MANUGURU ,
SATHUPALLY NAGAR
PANCHAYAT, MADHIR NAGAR
PANCHAYAT, KHAMMAM
MUNICIPAL CORPORATION -
PACKAGE -6- REG


 MAE/248/TU/TMDP/IULR/2017-
18/P7 / SELECTION OF
CONSULTING SERVICES FOR
DEVELOPMENT OF
INTEGRATED URDAN LAND
REGISTRY FOR BHONGIR ,                                                               Consultant
                                                                                                                                                    Under
SURYAPET , KODADA ,         IBRD / 78160         Project management support   Post   Qualification       Open - National        237,615.38   0.00                    2017-06-05            2017-06-26   2017-06-17   2017-08-09                             2017-09-08   2017-10-13   2018-04-11
                                                                                                                                                    Implementation
HUZURABAD NAGAR                                                                      Selection
PANCHAYAT, NALGONDA,
MIRYALGUDA MUNICIPALITY,
DEVARAKONDA NAGAR
PANCHAYAT, JANAGAON
MUNICIPALITY PACKAGE -7




                                                                                                                                                                                  Page 4
 MAE/248/TU/TMDP/IULR/2017-
18/P8 / SELECTION OF
CONSULTING SERVICES FOR
DEVELOPMENT OF
INTEGRATED URDAN LAND
REGISTRY FOR SIDDIPET ,                                                        Consultant
                                                                                                                                     Under
GAJWEL NP, DUBBAKKA NP, IBRD / 78160       Project management support   Post   Qualification   Open - National   193,000.00   0.00                    2017-06-05            2017-06-26   2017-06-17   2017-08-09   2017-09-08   2017-10-13   2018-04-11
                                                                                                                                     Implementation
HUSNABAD NP, SANGAREDDY                                                        Selection
, SADASIVAPET ,
ZAHEERABAD , ANDOLE-
JOGIPET NAGAR PANCHAYAT,
SHAMSHABAD (NAC), MEDAK
- PACKAGE -8


 MAE/248/TU/TMDP/IULR/2017-
18/P9 / SELECTION OF
CONSULTING SERVICES FOR
DEVELOPMENT OF
INTEGRATED URDAN LAND
REGISTRY FOR
MAHABOOBNAGAR,                                                                 Consultant
                                                                                                                                     Under
BADEPALLY NP,               IBRD / 78160   Project management support   Post   Qualification   Open - National   257,692.31   0.00                    2017-06-05            2017-06-26   2017-06-17   2017-08-09   2017-09-08   2017-10-13   2018-04-11
                                                                                                                                     Implementation
NARAYANAPET , GADWAL                                                           Selection
,LEEJA NP, WANAPARTHY NP
, NAGARKURNOOL
NP,KOLLAPUR NP,
KALWAKURTHY NP,
ACHAMPET NP, TANDUR ,
VIKARABAD -PACKAGE -9-


 MAE/248/TU/TMDP/IULR/2017-
18/P10 / SELECTION OF
CONSULTING SERVICES FOR
DEVELOPMENT OF
INTEGRATED URDAN LAND
REGISTRY FOR PEDDA                                                             Consultant
                                                                                                                                     Under
AMBERPET NP, BADANGPET IBRD / 78160        Project management support   Post   Qualification   Open - National   251,000.00   0.00                    2017-06-05            2017-06-26   2017-06-17   2017-08-09   2017-09-08   2017-10-13   2018-04-11
                                                                                                                                     Implementation
NP, IBRAHIMPATNAM NP,                                                          Selection
JALPALLY, MEERPET ,
JILLELGUDA, SHADNAGAR ,
MEDCHAL NP, BODUPPAL
,PEERZADIGUDA - PACKAGE-
10


 MAE/248/TU/TMDP/IULR/2017-
18/P11 / SELECTION OF
CONSULTING SERVICES FOR                                                        Consultant
                                                                                                                                     Under
DEVELOPMENT OF              IBRD / 78160   Project management support   Post   Qualification   Open - National   208,615.38   0.00                    2017-06-05            2017-06-26   2017-06-17   2017-08-09   2017-09-08   2017-10-13   2018-04-11
                                                                                                                                     Implementation
INTEGRATED URDAN LAND                                                          Selection
REGISTRY FOR KAPRA ,
UPPAL - PACKAGE-11


 MAE/248/TU/TMDP/IULR/2017-
18/P12 / SELECTION OF
CONSULTING SERVICES FOR
                                                                               Consultant
DEVELOPMENT OF                                                                                                                       Under
                            IBRD / 78160   Project management support   Post   Qualification   Open - National   262,153.85   0.00                    2017-06-05            2017-06-26   2017-06-17   2017-08-09   2017-09-08   2017-10-13   2018-04-11
INTEGRATED URDAN LAND                                                                                                                Implementation
                                                                               Selection
REGISTRY FOR L.B. NAGAR
3A, L.B. NAGAR 3 B -
PACKAGE -12- REG


 MAE/248/TU/TMDP/IULR/2017-
18/P13 / SELECTION OF
CONSULTING SERVICES FOR
                                                                               Consultant
DEVELOPMENT OF                                                                                                                       Under
                            IBRD / 78160   Project management support   Post   Qualification   Open - National   246,538.46   0.00                    2017-06-05            2017-06-26   2017-06-17   2017-08-09   2017-09-08   2017-10-13   2018-04-11
INTEGRATED URDAN LAND                                                                                                                Implementation
                                                                               Selection
REGISTRY FOR CHARMINAR
4A,CHARMINAR 4B -PACKAGE
-13


 MAE/248/TU/TMDP/IULR/2017-
18/P14 / SELECTION OF
CONSULTING SERVICES FOR
                                                                               Consultant
DEVELOPMENT OF                                                                                                                       Under
                            IBRD / 78160   Project management support   Post   Qualification   Open - National   253,230.77   0.00                    2017-06-05            2017-06-26   2017-06-17   2017-08-09   2017-09-08   2017-10-13   2018-04-11
INTEGRATED URDAN LAND                                                                                                                Implementation
                                                                               Selection
REGISTRY FOR CHARMINAR -
2, RAJENDRA NAGAR -
PACKAGE -14


 MAE/248/TU/TMDP/IULR/2017-
18/P15 / SELECTION OF
CONSULTING SERVICES FOR
                                                                               Consultant
DEVELOPMENT OF                                                                                                                       Under
                            IBRD / 78160   Project management support   Post   Qualification   Open - National   248,769.23   0.00                    2017-06-05            2017-06-26   2017-06-17   2017-08-09   2017-09-08   2017-10-13   2018-04-11
INTEGRATED URDAN LAND                                                                                                                Implementation
                                                                               Selection
REGISTRY FOR KHAIRTABAD-
7A, KHAIRATABAD- 7 B ,
ABIDS-1 -PACKAGE -15


 MAE/248/TU/TMDP/IULR/2017-
18/P16 / SELECTION OF
CONSULTING SERVICES FOR                                                        Consultant
                                                                                                                                     Under
DEVELOPMENT OF              IBRD / 78160   Project management support   Post   Qualification   Open - National   226,461.54   0.00                    2017-06-05            2017-06-26   2017-06-17   2017-08-09   2017-09-08   2017-10-13   2018-04-11
                                                                                                                                     Implementation
INTEGRATED URDAN LAND                                                          Selection
REGISTRY FORABIDS-9 A,
ABIDS-9 B -PACKAGE -16


 MAE/248/TU/TMDP/IULR/2017-
18/P17 / SELECTION OF
CONSULTING SERVICES FOR
                                                                               Consultant
DEVELOPMENT OF                                                                                                                       Under
                            IBRD / 78160   Project management support   Post   Qualification   Open - National   259,923.08   0.00                    2017-06-05            2017-06-26   2017-06-17   2017-08-09   2017-09-08   2017-10-13   2018-04-11
INTEGRATED URDAN LAND                                                                                                                Implementation
                                                                               Selection
REGISTRY FOR KHAIRTABAD-
10A, KHAIRATABAD- 10 B-
PACKAGE -17


 MAE/248/TU/TMDP/IULR/2017-
18/P18 / SELECTION OF
CONSULTING SERVICES FOR
DEVELOPMENT OF                                                                 Consultant
                                                                                                                                     Under
INTEGRATED URDAN LAND       IBRD / 78160   Project management support   Post   Qualification   Open - National   242,076.92   0.00                    2017-06-05            2017-06-26   2017-06-17   2017-08-09   2017-09-08   2017-10-13   2018-04-11
                                                                                                                                     Implementation
REGISTRY FOR                                                                   Selection
SERILIMGAMPALLY-1,
SERILIMGAMPALLY-2 -
PACKAGE -18




                                                                                                                                                                   Page 5
 MAE/248/TU/TMDP/IULR/2017-
18/P19 / SELECTION OF
CONSULTING SERVICES FOR
DEVELOPMENT OF                                                                                   Consultant
                                                                                                                                                                                                Under
INTEGRATED URDAN LAND       IBRD / 78160           Project management support   Post             Qualification        Open - National                             286,692.31             0.00                    2017-06-05                 2017-06-26   2017-06-17   2017-08-09                                                                                              2017-09-08                2017-10-13                2018-04-11
                                                                                                                                                                                                Implementation
REGISTRY FOR R.C. PURAM,                                                                         Selection
KUKATPALLY- 14 A,
KUKATPALLY- 14 B -PACKAGE
-19


 MAE/248/TU/TMDP/IULR/2017-
18/P20 / SELECTION OF
CONSULTING SERVICES FOR
                                                                                                 Consultant
DEVELOPMENT OF                                                                                                                                                                                  Under
                            IBRD / 78160           Project management support   Post             Qualification        Open - National                             244,307.69             0.00                    2017-06-05                 2017-06-26   2017-06-17   2017-08-09                                                                                              2017-09-08                2017-10-13                2018-04-11
INTEGRATED URDAN LAND                                                                                                                                                                           Implementation
                                                                                                 Selection
REGISTRY FOR-
QUTUBILLAPUR, ALWAL -
PACKAGE -20


 MAE/248/TU/TMDP/IULR/2017-
18/P21 / SELECTION OF
CONSULTING SERVICES FOR                                                                          Consultant
                                                                                                                                                                                                Under
DEVELOPMENT OF              IBRD / 78160           Project management support   Post             Qualification        Open - National                             172,923.08             0.00                    2017-06-05                 2017-06-26   2017-06-17   2017-08-09                                                                                              2017-09-08                2017-10-13                2018-04-11
                                                                                                                                                                                                Implementation
INTEGRATED URDAN LAND                                                                            Selection
REGISTRY FOR MALKAJGIRI -
PACKAGE -21


 MAE/248/TU/TMDP/IULR/2017-
18/P22 / SELECTION OF
CONSULTING SERVICES FOR
                                                                                                 Consultant
DEVELOPMENT OF                                                                                                                                                                                  Under
                            IBRD / 78160           Project management support   Post             Qualification        Open - National                             219,769.23             0.00                    2017-06-05                 2017-06-26   2017-06-17   2017-08-09                                                                                              2017-09-08                2017-10-13                2018-04-11
INTEGRATED URDAN LAND                                                                                                                                                                           Implementation
                                                                                                 Selection
REGISTRY FOR
SECUNDERABAD -PACKAGE -
22


CDMA/TMDP/TU/CONSULTANT
S/RFP/33 / Preparation of GIS                      Municipal capacity                            Quality And Cost-
                              IBRD / 78160                                      Prior                                 Open - National                             596,380.00             0.00   Canceled         2016-11-15   2016-11-10    2016-11-16                2016-11-18                                          2016-11-19                2016-11-20                2016-11-22                2016-12-27                2017-08-24
Base Maps for 22 newly formed                      enhancement                                   Based Selection
ULBs


CDMA/TMDP/TU/CONSULTANT
S/RFP/33/REVISED /                                 Municipal capacity                            Quality And Cost-
                             IBRD / 78160                                       Post                                  Open - National                             596,380.00       626,587.60   Signed           2017-08-18   2015-03-12    2017-09-08                2017-10-22   2016-01-07                             2017-11-19   2016-03-04   2017-12-19   2016-08-03   2018-01-23   2016-09-28   2018-02-27   2017-02-27   2019-02-27
Preparation of GIS Base Maps                       enhancement                                   Based Selection
for 22 ULBs


 MAE/253/TU/TMDP/UGEP/2017
/ Procurement of Consultancy
services for preparation of DPR                                                                                                                                                                 Under
                                IBRD / 78160       Project management support   Post             Least Cost Selection Open - National                             118,000.00             0.00                    2017-09-01   2017-09-14    2017-09-22   2017-09-19   2017-11-05                                          2017-12-03                2018-01-02                2018-02-06                2018-03-13                2018-09-09
on Urban Green Environment                                                                                                                                                                      Implementation
Project in 72 ULBs of Telangana
State


MAE/247/TU/TMDP/UGD/DPRS/
PKG-I/2017-18/ / TMDP-
PREPARATION OF DPR FOR                                                                                                                                                                          Pending
                          IBRD / 78160             Project management support   Post             Least Cost Selection Open - International                        432,617.50             0.00                    2017-10-23                 2017-11-13                2017-12-27                                          2018-01-24                2018-02-23                2018-03-30                2018-05-04                2018-10-31
SEWERAGE AND STORM                                                                                                                                                                              Implementation
WATER DRAINAGE SYSTEM-
PACKAGE-I.


MAE/247/TU/TMDP/UGD/DPRS/
PKG-II/2017-18/ /
PREPARATION OF DPR FOR                                                                                                                                                                          Pending
                          IBRD / 78160             Project management support   Post             Least Cost Selection Open - International                        432,617.50             0.00                    2017-10-23                 2017-11-13                2017-12-27                                          2018-01-24                2018-02-23                2018-03-30                2018-05-04                2018-10-31
SEWERAGE AND STORM                                                                                                                                                                              Implementation
WATER DRAINAGE SYSTEM-
PACKAGE-II


MAE/247/TU/TMDP/UGD/DPRS/
PKG-III/2017-18 /
PREPARATION OF DPR FOR                                                                                                                                                                          Pending
                          IBRD / 78160             Project management support   Post             Least Cost Selection Open - International                        432,617.50             0.00                    2017-10-23                 2017-11-13                2017-12-27                                          2018-01-24                2018-02-23                2018-03-30                2018-05-04                2018-10-31
SEWERAGE AND STORM                                                                                                                                                                              Implementation
WATER DRAINAGE SYSTEM -
PACKAGE-III


MAE/247/TU/TMDP/UGD/DPRS/
PKG-IV/2017-18 /
PREPARATION OF DPR FOR                                                                                                                                                                          Pending
                          IBRD / 78160             Project management support   Post             Least Cost Selection Open - International                        432,617.50             0.00                    2017-10-23                 2017-11-13                2017-12-27                                          2018-01-24                2018-02-23                2018-03-30                2018-05-04                2018-10-31
SEWERAGE AND STORM                                                                                                                                                                              Implementation
WATER DRAINAGE SYSTEM-
PACKAGE-IV




INDIVIDUAL CONSULTANTS
  Activity Reference No. /                                                                                                                                                                                                                       Invitation to
                                                                                                                                             Contract Type    Estimated        Actual Amount                                                                            Draft Negotiated
         Description           Loan / Credit No.           Component               Review Type         Method          Market Approach                                                          Process Status    Terms of Reference         Identified/Selected                                   Signed Contract        Contract Completion
                                                                                                                                                             Amount (US$)          (US$)                                                                                    Contract
                                                                                                                                                                                                                                                  Consultant
                                                                                                                                                                                                                 Planned       Actual       Planned        Actual     Planned       Actual      Planned       Actual      Planned       Actual
 148/PS/APMDP/2017 /
Comprehensive water supply
                                                   Municipal capacity                            Individual Consultant                                                                          Pending
improvement scheme in Badvel   IBRD / 78160                                     Post                                   Limited                                     15,833.33             0.00                    2017-05-08                 2017-05-08                2017-05-08                2017-05-09                2017-08-07
                                                   enhancement                                   Selection                                                                                      Implementation
Municipality-Engaging ooof
Technical Consultant-Reg.


 MAE/252/TU/TMDP/PMU/2017 /
Telangana Municipal
Development Project -                              Municipal capacity                            Individual Consultant
                              IBRD / 78160                                      Post                                   Open                                        32,677.00        33,045.51   Signed           2017-08-05   2017-08-03    2017-09-15   2017-09-12   2017-10-06   2017-09-14   2017-11-10   2017-09-15   2018-05-09
Establishment of Transitional                      enhancement                                   Selection
PMU-Project Manager (eGov
expert)-Reg .


MAE/252/TU/TMDP/PMU/2017/2
/ Telangana Municipal
Development Project - Formation                    Municipal capacity                            Individual Consultant                                                                          Under
                                IBRD / 78160                                    Post                                   Open                                        21,784.62             0.00                    2017-08-08   2017-08-03    2017-09-26                2017-10-17                2017-11-21                2018-05-20
of Transitional PMU-Urban                          enhancement                                   Selection                                                                                      Implementation
Planner/ Management Expert-
Reg.


MAE/252/TU/TMDP/PMU/2017/3
/ Telangana Municipal
Development Project - Formation                    Municipal capacity                            Individual Consultant                                                                          Under
                                IBRD / 78160                                    Post                                   Open                                        21,784.62             0.00                    2017-08-08   2017-08-03    2017-09-26                2017-10-17                2017-11-21                2018-05-20
of Transitional PMU-Capacity                       enhancement                                   Selection                                                                                      Implementation
building /Institutional
Strengthening Specialist - Reg.




                                                                                                                                                                                                                                   Page 6
MAE/252/TU/TMDP/PMU/2017/4
/ Telangana Municipal
                                                Municipal capacity                  Individual Consultant                           Under
Development Project - Formation IBRD / 78160                                 Post                         Open   21,784.62   0.00                    2017-08-08   2017-08-03    2017-09-26   2017-10-17   2017-11-21   2018-05-20
                                                enhancement                         Selection                                       Implementation
of Transitional PMU- GIS Expert-
Reg.


 MAE/241/TU/TMDP/FM/2016 /
Individual Consultant as Finance                                                    Individual Consultant                           Under
                                 IBRD / 78160   Project management support   Post                         Open   11,726.25   0.00                    2017-08-23   2017-01-09    2017-10-11   2017-11-01   2017-12-06   2018-06-04
Manager                                                                             Selection                                       Implementation
TMDP




                                                                                                                                                                       Page 7