PROCUREMENT PLAN (Textual Part)
Project information: Benin Energy Services Improvement Project P161015
Project Implementation agency: Ministry of Energy
Date of the Procurement Plan: 10/11/2017
Period covered by this Procurement Plan: 01/01/2018 – 30/06/2019


Preamble

In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers”
(July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in
Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and
conduct all procurement transactions for the Project.

This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan
for the Project. The following conditions apply to all procurement activities in the Procurement
Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the
Procurement Regulations are set forth in STEP.

The Bank’s Standard Procurement Documents: shall be used for all contracts subject to
international competitive procurement and those contracts as specified in the Procurement Plan
tables in STEP.

National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement
Regulations, when approaching the national market (as specified in the Procurement Plan tables
in STEP), the country’s own procurement procedures may be used.
     When the Borrower uses its own national open competitive procurement arrangements as set
     forth in [insert appropriate references to the national procurement legislation], such
     arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the
     following conditions.
     List only the applicable conditions required to ensure consistency with paragraph 5.4 of the
     Procurement Regulations. If no conditions apply, delete the phrase “and the following
     conditions”.

     When other national procurement arrangements other than national open competitive
     procurement arrangements are applied by the Borrower, such arrangements shall be subject
     to paragraph 5.5 of the Procurement Regulations.
Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may
be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not
Applicable”
Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement
Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise
state “Not Applicable”
Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods
and Works). Specify for each
     Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan
     tables];
     Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan
     tables]
Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and
3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has
formally agreed to provide the Borrower with HEIS. Otherwise delete]
Other Relevant Procurement Information.
Provide any other relevant procurement information such as procedures for CDD components,
Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc.
PROCUREMENT
                                Benin : Energy Service Improvement Project
PLAN
General Information
Country:                        Benin                                       Bank’s Approval Date of the Original Procurement Plan:                   2017-12-20
                                                                                                                                       2020-11-17
                                                                            Revised Plan Date(s): (comma delineated, leave blank if none)
Project ID:                     P161015                                     GPN Date:                                                                2017-12-20
Project Name:                   Energy Service Improvement Project
Loan / Credit No:               IDA / 61050
Executing Agency(ies): PROJECTS IMPLEMENTATION UNIT




WORKS
                                                                                                                                                                                                                                                                                                                                                                                                 Bid Evaluation
Activity Reference No. /                                                                                                                                                              Procurement   Estimated       Actual                                                                      Draft Bidding
                                Loan / Credit                                                                      Market         Procurement        Prequalification   High SEA/SH                                              Process      Draft Pre-qualification    Prequalification                             Specific Procurement      Bidding Documents   Proposal Submission /          Report and                                      Contract
        Description                                     Component             Review Type        Method                                                                                Document       Amount        Amount                                                                       Document /                                                                                                               Signed Contract
                                      No.                                                                         Approach           Process              (Y/N)            Risk                                                   Status           Documents            Evaluation Report                              Notice / Invitation          as Issued        Opening / Minutes        Recommendation for                                 Completion
                                                                                                                                                                                         Type          (US$)        (US$)                                                                       Justification
                                                                                                                                                                                                                                                                                                                                                                                                      Award
                                                                                                                                                                                                                                               Planned      Actual      Planned    Actual   Planned       Actual      Planned       Actual      Planned    Actual    Planned      Actual      Planned       Actual      Planned      Actual   Planned


 BJ-PIU-36390-CW-RFB /
Travaux de construction de
quatorze (14) mielleries dans                   Component 3: Community-
                                                                                                                                Single Stage - One                                                                              En attente
les communes de Bassila,        IDA / 61050     Based Management of Wood A posteriori       Appel d'offres    Open - National                                                                         350,000.00        0.00                                                                2019-08-12                2019-09-01                                    2019-10-01                2019-10-21                2019-12-04            2020-06-01
                                                                                                                                Envelope                                                                                        d'exécution
Djidja, Djougou, N'dali et                      Fuels
Pèrèrè et de réfection
d'anciennes mielleries




 BJ-PIU-36387-CW-RFB /
                                                Component 4 : Sector
Travaux de réfection des                                                                                                        Single Stage - One
                                IDA / 61050     Development and             A posteriori    Appel d'offres    Open - National                                                                         200,000.00        0.00    Annulé                                                      2019-05-15                2019-06-04                                    2019-07-04                2019-07-24                2019-09-06            2020-03-04
locaux de l'Unité de                                                                                                            Envelope
                                                Implementation Support
Coordination du PASE




 BJ-PIU-36465-CW-RFB /
Construction de quatorze
(14) forages d'eau équipés de                   Component 3: Community-
                                                                                                                                Single Stage - One                                                                              En attente
pompes à motricité humaine      IDA / 61050     Based Management of Wood A posteriori       Demande de prix   Limited                                                                                 140,000.00        0.00                                                                                          2019-08-10                                                                                        2019-10-06            2020-04-03
                                                                                                                                Envelope                                                                                        d'exécution
dans les communes de                            Fuels
Bassila, Djidja, Djoudou,
N'dali et Pèrèrè




 BJ-PIU-36372-CW-RFB /
Travaux de construction du                      Component 3: Community-
                                                                                                                                Single Stage - One                                                                              En attente
siège de la Communauté          IDA / 61050     Based Management of Wood A posteriori       Demande de prix   Limited                                                                                 150,000.00        0.00                                                                                          2019-08-17                                                                                        2019-10-13            2020-04-10
                                                                                                                                Envelope                                                                                        d'exécution
Forestière de l'Ouémé                           Fuels
Supérieur (CoFOS)




 BJ-PIU-200262-CW-RFB /
Travaux de mise aux normes
des postes HT/MT des sous-
                                                Component 2: Distribution
stations de DASSA-                                                                                            Open -            Single Stage - One                                                                              En attente
                                IDA / 61050     Network Strengthening in    A posteriori    Appel d'offres                                                                                           6,000,000.00       0.00                                                                2020-12-01                2020-12-06                                    2021-01-17                2021-02-16                2021-03-23            2021-09-19
ZOUNME, GLAZOUE et                                                                                            International     Envelope                                                                                        d'exécution
                                                Targeted Areas
PAOUIGNAN et des réseaux
souterrains de la ville de
PORTO-NOVO




 BJ-PIU-36369-CW-RFB /
Travaux de mise aux normes
des postes HT/MT des sous-
                                                Component 2: Distribution
stations de DASSA-                                                                                                              Single Stage - One
                                IDA / 61050     Network Strengthening in    A posteriori    Appel d'offres    Open - National                                                                        5,800,000.00       0.00    Annulé                                                      2019-05-15   2020-03-17   2019-06-04                                    2019-07-19   2020-07-16   2019-08-08   2020-08-31   2019-09-21            2020-09-15
ZOUNME, GLAZOUE et                                                                                                              Envelope
                                                Targeted Areas
PAOUIGNAN et des réseaux
souterrains de la ville de
PORTO-NOVO




 BJ-PIU-36361-CW-RFB /
Travaux de normalisation et
d'extension des réseaux de
                                                Component 2: Distribution
distribution de la SBEE                                                                                       Open -            Single Stage - One
                                IDA / 61050     Network Strengthening in    A priori        Appel d'offres                                                                                          14,000,000.00       0.00    Annulé                                                      2019-05-08   2020-04-06   2019-06-07   2020-06-15                       2019-08-21   2020-07-16   2019-09-30                2019-11-13            2021-05-06
dans les quartiers                                                                                            International     Envelope
                                                Targeted Areas
périphériques des villes de
COTONOU, PORTO-NOVO,
PARAKOU et NATITINGOU




                                                                                                                                                                                                                       Page 1
 BJ-PIU-200617-CW-RFB /
Travaux de normalisation et
d'extension des réseaux de
                                                Component 2: Distribution
distribution de la SBEE                                                                                       Open -            Single Stage - One                                                                                         En attente
                                IDA / 61050     Network Strengthening in    A posteriori    Appel d'offres                                                                                                   14,000,000.00         0.00                                                                2020-12-10                2020-12-15                                      2021-01-26                2021-02-25                2021-04-01            2021-09-28
dans les quartiers                                                                                            International     Envelope                                                                                                   d'exécution
                                                Targeted Areas
périphériques des villes de
COTONOU, PORTO-NOVO,
PARAKOU et NATITINGOU




 BJ-PIU-204076-CW-RFQ /
                                                Component 4 : Sector
Travaux de réfection des                                                                                                        Single Stage - One                                                                                         En attente
                                IDA / 61050     Development and             A posteriori    Demande de prix   Limited                                                                                          160,000.00          0.00                                                                                          2020-12-06                                                                                          2021-01-31            2021-07-30
locaux de l'Unité de                                                                                                            Envelope                                                                                                   d'exécution
                                                Implementation Support
Coordination du PASE




GOODS
                                                                                                                                                                                                                                                                                                                                                                                    Bid Evaluation
Activity Reference No. /                                                                                                                                                                                                                                                         Draft Bidding
                                Loan / Credit                                                                      Market         Procurement        Prequalification    Estimated        Actual Amount        Process       Draft Pre-qualification      Prequalification                             Specific Procurement      Bidding Documents     Proposal Submission /          Report and
           Description                                  Component             Review Type         Method                                                                                                                                                                          Document /                                                                                                                 Signed Contract         Contract Completion
                                      No.                                                                         Approach           Process              (Y/N)         Amount (US$)          (US$)             Status            Documents              Evaluation Report                              Notice / Invitation            as Issued        Opening / Minutes        Recommendation for
                                                                                                                                                                                                                                                                                 Justification
                                                                                                                                                                                                                                                                                                                                                                                         Award
                                                                                                                                                                                                                              Planned        Actual      Planned    Actual   Planned       Actual      Planned       Actual      Planned      Actual    Planned      Actual      Planned       Actual      Planned       Actual      Planned      Actual


 BJ-PIU-35998-GO-RFB /
Fourniture de 75 000                            Component 2: Distribution
                                                                                                              Open -            Single Stage - One
compteurs électroniques à       IDA / 61050     Network Strengthening in    A priori        Appel d'offres                                                                 6,000,000.00       4,279,222.67   Signé                                                           2017-12-01   2018-04-03   2017-12-31   2018-05-04                         2018-03-16   2018-07-03   2018-04-15   2018-11-02   2018-06-09   2019-01-21   2018-12-06
                                                                                                              International     Envelope
prépaiement de type STS au                      Targeted Areas
profit de la SBEE.




 BJ-PIU-36002-GO-RFB /
Fourniture d'accessoires de
branchement pour 75 000
                                                Component 2: Distribution
compteurs électroniques à                                                                                     Open -            Single Stage - One
                                IDA / 61050     Network Strengthening in    A priori        Appel d'offres                                                                 9,500,000.00       8,597,094.00   Signé                                                           2017-12-01   2018-03-30   2017-12-31   2018-05-04                         2018-03-16   2018-07-03   2018-04-15   2018-11-06   2018-06-09   2019-01-21   2018-12-06
prépaiement de type STS et                                                                                    International     Envelope
                                                Targeted Areas
leurs transport et
installation au profit de la
SBEE.




 BJ-PIU-36505-GO-RFB /
Fourniture de dix mille (10
                                                Component 2: Distribution
000)    lampes à diode                                                                                        Open -            Single Stage - One
                                IDA / 61050     Network Strengthening in    A posteriori    Appel d'offres                                                                 1,500,000.00       1,271,916.53   Signé                                                           2017-12-15   2018-01-19   2018-01-14   2019-01-21                         2018-03-15   2019-03-20   2018-04-14   2019-03-21   2018-05-28   2019-12-06   2018-11-24
électroluminescente (LED)                                                                                     International     Envelope
                                                Targeted Areas
pour l'éclairage public au
profit de la SBEE




 BJ-PIU-36050-GO-DIR /
Acquisition de matériels                                                                    Passation de
                                                Component 3: Community-
roulants     pour le                                                                        marchés auprès
                                IDA / 61050     Based Management of Wood A posteriori                         Direct                                                        900,000.00         439,402.34    Signé                                                           2018-06-15   2018-10-03   2018-07-15   2018-10-10                                                                             2018-11-02   2018-10-10   2019-05-01
renforcement des capacités                                                                  des agences de
                                                Fuels
des structures du secteur de                                                                l'ONU
l'énergie.




 BJ-PIU-36045-GO-DIR /
Acquisition d'un véhicule de                    Component 2: Distribution                   Passation de
recherche de défauts sur les    IDA / 61050     Network Strengthening in    A posteriori    marché de gré à   Direct                                                        250,000.00                0.00   Annulé                                                          2018-05-21   2018-06-13   2018-06-20                                                                                          2018-08-23                2019-02-19
câbles souterrains au profit                    Targeted Areas                              gré
de la SBEE




 BJ-PIU-83862-GO-RFQ /
                                                Component 4 : Sector
Fourniture et pose de                                                                                                           Single Stage - One                                                           En attente
                                IDA / 61050     Development and             A posteriori    Demande de prix   Limited                                                        25,000.00                0.00                                                                                             2018-12-14                                                                                          2019-01-13                2019-02-12
rideaux pour les bureaux du                                                                                                     Envelope                                                                     d'exécution
                                                Implementation Support
PASE




 BJ-PIU-36143-GO-RFB /
                                                Component 4 : Sector
Acquisition de matériels                                                                                                        Single Stage - One
                                IDA / 61050     Development and             A posteriori    Appel d'offres    Open - National                                               100,000.00                0.00   Annulé                                                          2018-03-15                2018-04-14                                      2018-05-14                2018-06-13                2018-07-28                2018-09-26
informatiques pour l'Unité de                                                                                                   Envelope
                                                Implementation Support
Coordination du projet




                                                                                                                                                                                                                                  Page 2
 BJ-PIU-95476-GO-RFQ /
Acquisition de matériels                      Component 4 : Sector
                                                                                                                             Single Stage - One                         En cours
informatiques et                IDA / 61050   Development and             A posteriori   Demande de prix   Limited                                 100,000.00    0.00                                                    2019-02-08   2019-02-20                                                       2019-03-26   2019-05-10
                                                                                                                             Envelope                                   d'exécution
bureautiques pour l'Unité de                  Implementation Support
Coordination du projet




 BJ-PIU-36109-GO-RFB /
Acquisition de matériels et
                                              Component 3: Community-
de mobiliers de bureau au                                                                                                    Single Stage - One
                                IDA / 61050   Based Management of Wood A posteriori      Appel d'offres    Open - National                         300,000.00    0.00   Annulé                 2018-03-15                2018-03-30                2018-04-29                2018-05-29                2018-07-13   2018-09-11
profit de l'ARE, de la DGE,                                                                                                  Envelope
                                              Fuels
de l'ABERME, de la SBEE,
de la CoFOS et de l'UCP




 BJ-PIU-95478-GO-RFQ /
Acquisition de mobiliers de
                                              Component 4 : Sector
bureau au profit de l'ARE,                                                                                                   Single Stage - One                         En cours
                                IDA / 61050   Development and             A posteriori   Demande de prix   Limited                                 100,000.00    0.00                                                    2019-02-05   2019-02-20                                                       2019-03-14   2019-04-28
de la DGE, de l'ABERME,                                                                                                      Envelope                                   d'exécution
                                              Implementation Support
de la SBEE, de la CoFOS
et de l'UCP




 BJ-PIU-36256-GO-RFB /
Fourniture et installation de
six mille (6 000) compteurs                   Component 1: Improvement
                                                                                                           Open -            Single Stage - One
intelligents et d'équipements   IDA / 61050   of SBEE’s Commercial        A priori       Appel d'offres                                           2,000,000.00   0.00   Annulé                 2018-04-01   2020-01-20   2018-05-01   2020-02-03   2018-06-30   2020-03-10   2018-07-15   2020-07-20   2018-09-08   2019-03-07
                                                                                                           International     Envelope
pour l'installation d'un                      Performance
centre de comptage au profit
de la SBEE




 BJ-PIU-36327-GO-RFB /
Fourniture d'équipements et
                                              Component 1: Improvement
mise en place d'un centre                                                                                                    Single Stage - One                         En attente
                                IDA / 61050   of SBEE’s Commercial        A posteriori   Appel d'offres    Open - National                         200,000.00    0.00                          2019-07-15                2019-07-30                2019-08-29                2019-09-03                2019-10-13   2020-04-10
d'appels et de conduite                                                                                                      Envelope                                   d'exécution
                                              Performance
d'enquêtes de satisfaction de
la clientèle de la SBEE




 BJ-PIU-36333-GO-RFB /
Fourniture et installation                    Component 2: Distribution
                                                                                                           Open -            Single Stage - One                         En attente
d'un atelier de réparation de IDA / 61050     Network Strengthening in    A posteriori   Appel d'offres                                            800,000.00    0.00                          2019-01-31                2019-02-15                2019-03-17                2019-04-06                2019-05-21   2019-11-17
                                                                                                           International     Envelope                                   d'exécution
transformateurs au profit de                  Targeted Areas
la SBEE




 BJ-PIU-36235-GO-RFQ /
Acquisition de fournitures de
                                              Component 3: Community-
bureau et de produits                                                                                                        Single Stage - One                         En attente
                                IDA / 61050   Based Management of Wood A posteriori      Demande de prix   Limited                                  10,000.00    0.00                                                    2019-03-05                                                                    2019-04-11   2019-05-11
d'entretien au profit de                                                                                                     Envelope                                   d'exécution
                                              Fuels
l'UCP, de la CoFoMO et de
la CoFOS




 BJ-PIU-36247-GO-RFQ /
Acquisition de consommables
                                              Component 3: Community-
informatiques et                                                                                                             Single Stage - One                         En attente
                                IDA / 61050   Based Management of Wood A posteriori      Demande de prix   Limited                                  18,000.00    0.00                                                    2019-04-20                                                                    2019-05-27   2019-06-26
bureautiques au profit de                                                                                                    Envelope                                   d'exécution
                                              Fuels
l'UCP, de la CoForMO et de
la CoFOS




 BJ-PIU-36331-GO-RFB /
Acquisition d'une machine de                  Component 2: Distribution
                                                                                                                             Single Stage - One                         En attente
traitement d'huile et de        IDA / 61050   Network Strengthening in    A posteriori   Appel d'offres    Open - National                         500,000.00    0.00                          2019-02-04                2019-02-09                2019-03-23                2019-04-22                2019-06-05   2020-05-30
                                                                                                                             Envelope                                   d'exécution
divers autres équipements                     Targeted Areas
au profit de la SBEE




 BJ-PIU-105394-GO-RFB /
Acquisition d'un véhicule de                  Component 2: Distribution
                                                                                                           Open -            Single Stage - One                         En cours
recherche de défauts sur les    IDA / 61050   Network Strengthening in    A posteriori   Appel d'offres                                            270,000.00    0.00                          2019-05-15   2019-11-04   2019-05-20   2019-11-06   2019-07-01                2019-07-31                2019-09-04   2020-03-02
                                                                                                           International     Envelope                                   d'exécution
câbles souterrains au profit                  Targeted Areas
de la SBEE




                                                                                                                                                                                      Page 3
 BJ-PIU-172049-GO-RFQ /
Fourniture de matériels
                                                Component 3: Community-
informatiques et de Bureau                                                                                                   Single Stage - One                                                           En attente
                                IDA / 61050     Based Management of Wood A posteriori      Demande de prix   Limited                                                     100,000.00                0.00                                                                                     2020-07-07                                                                                  2020-09-01            2021-02-28
au profit de la DGRE,                                                                                                        Envelope                                                                     d'exécution
                                                Fuels
DAF/ME, DSI/ME,
EAT/SBEE et de la DGEFC




 BJ-PIU-172058-GO-RFQ /
                                                Component 3: Community-
Fourniture de Motos au                                                                                                       Single Stage - One                                                           En attente
                                IDA / 61050     Based Management of Wood A posteriori      Demande de prix   Limited                                                      70,000.00                0.00                                                                                     2020-07-07                                                                                  2020-09-01            2021-02-28
profit de la DGEFC, de la                                                                                                    Envelope                                                                     d'exécution
                                                Fuels
DGRE et de l'UCP




 BJ-PIU-200261-GO-RFB /
Fourniture et installation de
six mille (6 000) compteurs
                                                Component 1: Improvement
intelligents et divers autres                                                                                Open -          Single Stage - One
                                IDA / 61050     of SBEE’s Commercial       A priori        Appel d'offres                                                               3,000,000.00               0.00   Annulé                                                      2020-11-15            2020-11-20                                    2021-01-01              2021-01-31            2021-03-07            2021-09-03
équipements pour                                                                                             International   Envelope
                                                Performance
l'installation d'un centre de
comptage au profit de la
SBEE




 BJ-PIU-204075-GO-RFB /
Fourniture et installation de
six mille (6 000) compteurs
                                                Component 1: Improvement
intelligents et divers autres                                                                                Open -          Single Stage - One                                                           En attente
                                IDA / 61050     of SBEE’s Commercial       A posteriori    Appel d'offres                                                               3,000,000.00               0.00                                                               2020-12-01            2020-12-06                                    2021-01-17              2021-02-16            2021-03-23            2021-09-19
équipements pour                                                                                             International   Envelope                                                                     d'exécution
                                                Performance
l'installation d'un centre de
comptage au profit de la
SBEE




NON CONSULTING SERVICES
                                                                                                                                                                                                                                                                                                                                                                     Bid Evaluation
Activity Reference No. /                                                                                                                                                                                                                                                  Draft Bidding
                                Loan / Credit                                                                     Market       Procurement        Prequalification    Estimated        Actual Amount        Process     Draft Pre-qualification    Prequalification                         Specific Procurement      Bidding Documents   Proposal Submission /        Report and
        Description                                     Component            Review Type        Method                                                                                                                                                                     Document /                                                                                                     Signed Contract     Contract Completion
                                      No.                                                                        Approach         Process              (Y/N)         Amount (US$)          (US$)             Status          Documents            Evaluation Report                          Notice / Invitation          as Issued        Opening / Minutes      Recommendation for
                                                                                                                                                                                                                                                                          Justification
                                                                                                                                                                                                                                                                                                                                                                          Award
                                                                                                                                                                                                                         Planned      Actual      Planned    Actual   Planned      Actual   Planned       Actual      Planned    Actual    Planned     Actual     Planned      Actual   Planned      Actual   Planned      Actual


 BJ-PIU-83807-NC-RFQ /
Entretien et nettoyage des
locaux et de la cour du                         Component 4 : Sector
                                                                                                                             Single Stage - One                                                           En cours
PASE et de la Direction         IDA / 61050     Development and            A posteriori    Demande de prix   Limited                                                      20,000.00                0.00                                                                                     2018-11-17   2019-02-08                                                                     2018-12-17            2020-12-06
                                                                                                                             Envelope                                                                     d'exécution
Générale des Ressources                         Implementation Support
Énergétiques (DGRE) pour
les années 2019 et 2020




 BJ-PIU-83825-NC-RFQ /
Entretien et maintenance                        Component 4 : Sector
                                                                                                                             Single Stage - One                                                           En cours
des des ordinateurs et          IDA / 61050     Development and            A posteriori    Demande de prix   Limited                                                      10,000.00                0.00                                                                                     2018-11-17   2019-02-08                                                                     2018-12-17            2020-12-06
                                                                                                                             Envelope                                                                     d'exécution
accessoires pour les années                     Implementation Support
2019 et 2020




 BJ-PIU-83826-NC-RFQ /
Surveillance et gardiennage
du siège du PASE et de la                       Component 4 : Sector
                                                                                                                             Single Stage - One                                                           En cours
Direction Générale des          IDA / 61050     Development and            A posteriori    Demande de prix   Limited                                                      30,000.00                0.00                                                                                     2018-11-18   2019-02-08                                                                     2018-12-15            2020-12-04
                                                                                                                             Envelope                                                                     d'exécution
Ressources Energétiques                         Implementation Support
(DGRE) pour les années
2019 et 2020




 BJ-PIU-83832-NC-RFQ /
Entretien et maintenance                        Component 4 : Sector
                                                                                                                             Single Stage - One                                                           En cours
des climatiseurs du PASE        IDA / 61050     Development and            A posteriori    Demande de prix   Limited                                                        4,000.00               0.00                                                                                     2018-11-22   2019-02-08                                                                     2018-12-19            2020-12-08
                                                                                                                             Envelope                                                                     d'exécution
pour les années 2019 et                         Implementation Support
2020




                                                                                                                                                                                                                             Page 4
 BJ-PIU-83860-NC-RFQ /
Nettoyage et entretien des
locaux de la cour et des
                                                Component 4 : Sector
gazons de la Direction des                                                                                                         Single Stage - One                                                             En cours
                                IDA / 61050     Development and             A posteriori    Demande de prix      Limited                                                         4,000.00                  0.00                                                                                                2018-11-29   2019-02-08                                                                             2018-12-26                2020-12-15
Service Intercommunaux                                                                                                             Envelope                                                                       d'exécution
                                                Implementation Support
(DSI) de la CoForMO
pendant les années 2019 et
2020




 BJ-PIU-82016-NC-RFQ /
Acquisition d'un logiciel de
                                                Component 4 : Sector
gestion comptable et                                                                                                               Single Stage - One
                                IDA / 61050     Development and             A posteriori    Demande de prix      Limited                                                       25,000.00              17,123.15   Signé                                                                                        2018-11-20   2019-03-08                                                                             2019-01-15   2019-05-27   2019-02-14
financière du projet                                                                                                               Envelope
                                                Implementation Support
d'amélioration des services
énergétiques.




 BJ-PIU-94806-NC-RFQ /
Service d'un transitaire pour
                                                Component 4 : Sector
les formalités d'enlèvement                                                                                                        Single Stage - One                                                             En cours
                                IDA / 61050     Development and             A posteriori    Demande de prix      Limited                                                       50,000.00                   0.00                                                                                                2019-01-27   2019-02-20                                                                             2019-02-26                2019-03-28
des matériels roulants à                                                                                                           Envelope                                                                       d'exécution
                                                Implementation Support
acquérir par le biais de
UNOPS




 BJ-PIU-94808-NC-RFB /
Transport et pose de 75 000                     Component 2: Distribution
                                                                                                                                   Single Stage - One
compteurs électroniques à       IDA / 61050     Network Strengthening in    A posteriori    Appel d'offres       Open - National                                             1,700,000.00         1,323,594.27    Signé                                                              2019-01-22   2019-01-24   2019-01-27   2019-03-06                         2019-03-10   2019-04-03   2019-04-09   2019-04-04   2019-05-19   2019-09-26   2020-11-09
                                                                                                                                   Envelope
prépaiement de type STS au                      Targeted Areas
profit de la SBEE




CONSULTING FIRMS
Activity Reference No. /                                                                                                                                                                                                                                                                                                                                                    Combined Evaluation
                                Loan / Credit                                                                         Market        Contract Type        Estimated           Actual                                                           Expression of Interest Short List and Draft Request for Proposals Opening of Technical                  Evaluation of
        Description                                     Component             Review Type        Method                                                                                      Process Status         Terms of Reference                                                                                                                                       Report and Draft           Signed Contract         Contract Completion
                                      No.                                                                            Approach                           Amount (US$)      Amount (US$)                                                                Notice            Request for Proposals           as Issued           Proposals / Minutes    Technical Proposal
                                                                                                                                                                                                                                                                                                                                                                            Negotiated Contract
                                                                                                                                                                                                                    Planned      Actual        Planned      Actual       Planned      Actual      Planned       Actual      Planned      Actual   Planned       Actual      Planned       Actual      Planned       Actual      Planned       Actual


 BJ-PIU-36557-CS-QCBS /
Etude et mise en place d'un                     Component 1: Improvement                    Sélection fondée
                                                                                                                 Open -
système de comptabilité         IDA / 61050     of SBEE’s Commercial        A posteriori    sur la qualité et                                                350,000.00               0.00   Annulé                2017-12-15   2018-05-03    2018-01-05                2018-02-03                                          2018-03-20            2018-04-19                2018-05-24                2018-07-07                2019-07-07
                                                                                                                 International
analytique/apurement de                         Performance                                 le coût
porte-feuille de la SBEE




 BJ-PIU-36565-CS-CQS /
Recrutement d'un cabinet
                                                                                            Sélection fondée
pour l'élaboration de plans                     Component 3: Community-
                                                                                            sur les              Open -                                                                      En cours
d'aménagement forestier sur     IDA / 61050     Based Management of Wood A posteriori                                                                        280,000.00               0.00                         2018-02-01   2018-11-07    2018-02-22   2019-01-22   2018-04-07                                                                                          2018-05-07                2018-06-20                2018-12-17
                                                                                            qualifications des   International                                                               d'exécution
150 000 hectares dans les                       Fuels
                                                                                            consultants
communes de DJOUGOU, de
N'DALI et de PERERE




 BJ-PIU-36568-CS-CQS /
Recrutement d'un cabinet
pour les études, la
supervision et le contrôle                                                                  Sélection fondée
                                                Component 3: Community-
des travaux de construction                                                                 sur les                                                                                          En cours
                                IDA / 61050     Based Management of Wood A posteriori                            Open - National                              25,000.00               0.00                         2018-01-15   2018-05-19    2018-02-05   2019-08-07   2018-03-11                                                                                          2018-04-10                2018-05-24                2018-11-20
de huit (08) forages d'eau                                                                  qualifications des                                                                               d'exécution
                                                Fuels
équipés de pompes à                                                                         consultants
motricité humaine dans les
mielleries des communes de
la CoFOS




 BJ-PIU-36569-CS-CQS /
Recrutement d'un cabinet
pour les études, la                                                                         Sélection fondée
                                                Component 3: Community-
supervision et le contrôle                                                                  sur les                                                                                          En cours
                                IDA / 61050     Based Management of Wood A posteriori                            Open - National                              25,000.00               0.00                         2018-01-15   2019-12-03    2018-02-05                2018-03-11                                                                                          2018-04-10                2018-05-24                2018-11-20
des travaux de construction                                                                 qualifications des                                                                               d'exécution
                                                Fuels
des mielleries des communes                                                                 consultants
de la CoFOS et de réfection
des anciennes mielleries




                                                                                                                                                                                                                                     Page 5
 BJ-PIU-36510-CS-LCS /                        Component 4 : Sector
                                                                                         Sélection au                                               En cours
Audit des comptes du PASE, IDA / 61050        Development and             A posteriori                        Open - National    50,000.00   0.00                 2018-07-02   2018-07-16    2018-07-23                2018-09-05   2019-01-15   2018-10-20   2018-11-19   2018-12-24   2019-02-06   2019-05-07
                                                                                         moindre coût                                               d'exécution
gestions 2018, 2019 et 2020                   Implementation Support




 BJ-PIU-82013-CS-CQS / Un
consultant      pour les PAR
des travaux d'extension des
réseaux de distribution de la
                                                                                         Sélection fondée
SBEE dans les quartiers                       Component 2: Distribution
                                                                                         sur les                                                    En cours
périphériques de COTONOU,       IDA / 61050   Network Strengthening in    A posteriori                        Open - National   125,000.00   0.00                 2018-10-15   2018-10-23    2018-10-23                2018-12-06                                          2019-01-05   2019-02-18   2019-04-04
                                                                                         qualifications des                                         d'exécution
PORTO-NOVO, PARAKOU                           Targeted Areas
                                                                                         consultants
ET NATITINGOU et de
mise aux normes des postes
de DASSA, GLAZOUE et de
PAOUIGNAN




 BJ-PIU-82015-CS-CQS / Un
consultant      pour les EIES
des travaux d'extension des
réseaux de distribution de la
                                                                                         Sélection fondée
SBEE dans les quartiers                       Component 2: Distribution
                                                                                         sur les                                                    En cours
périphériques de COTONOU,       IDA / 61050   Network Strengthening in    A posteriori                        Open - National   125,000.00   0.00                 2018-10-15   2018-10-23    2018-10-23                2018-12-06                                          2019-01-05   2019-02-18   2019-04-04
                                                                                         qualifications des                                         d'exécution
PORTO-NOVO, PARAKOU                           Targeted Areas
                                                                                         consultants
ET NATITINGOU et de
mise aux normes des postes
de DASSA, GLAZOUE et de
PAOUIGNAN




 BJ-PIU-95239-CS-CQS /
Recrutement d'un cabinet                                                                 Sélection fondée
                                              Component 4 : Sector
pour les études, la                                                                      sur les                                                    En cours
                                IDA / 61050   Development and             A posteriori                        Limited            17,000.00   0.00                 2019-01-24   2019-02-13                              2019-01-31                                          2019-02-10   2019-02-25   2019-05-26
supervision et le contrôle                                                               qualifications des                                         d'exécution
                                              Implementation Support
des travaux de réfection des                                                             consultants
bâtiments du PASE




 BJ-PIU-36575-CS-QBS /
Etudes de faisabilité
détaillées relatives aux                      Component 4 : Sector                       Sélection fondée
                                                                                                              Open -
investissements prioritaires    IDA / 61050   Development and             A posteriori   sur la qualité et                      700,000.00   0.00   Annulé        2018-10-15                 2018-11-05                2018-12-19                2019-01-18   2019-02-17   2019-03-24   2019-04-28   2019-10-25
                                                                                                              International
issus du plan de production                   Implementation Support                     le coût
et de distribution de
l'électricité




 BJ-PIU-36564-CS-QBS /
Recrutement d'un cabinet
pour la formation d'une
                                              Component 1: Improvement
équipe de la SBEE à la                                                                   Sélection fondée     Open -
                                IDA / 61050   of SBEE’s Commercial        A posteriori                                          200,000.00   0.00   Annulé        2018-03-15                 2018-04-05                2018-05-19                2018-07-03   2018-07-23   2018-08-22   2018-10-05   2019-10-05
gestion des systèmes à                                                                   sur la qualité       International
                                              Performance
installer pour l'amélioration
de la gestion de ladite
société




 BJ-PIU-36567-CS-CQS /
Recrutement d'un cabinet
                                                                                         Sélection fondée
pour la formation,                            Component 3: Community-
                                                                                         sur les              Open -                                En cours
l'encadrement et l'équipement IDA / 61050     Based Management of Wood A posteriori                                             150,000.00   0.00                 2019-01-31   2019-02-25    2019-02-21   2019-08-07   2019-04-06                                          2019-05-06   2019-06-19   2019-12-16
                                                                                         qualifications des   International                         d'exécution
des apiculteurs des                           Fuels
                                                                                         consultants
communes de DJOUGOU,
N'DALI et de PERERE




 BJ-PIU-36574-CS-CQS /
                                                                                         Sélection fondée
Etude de faisabilité pour la                  Component 3: Community-
                                                                                         sur les              Open -                                En attente
mise en place de centres        IDA / 61050   Based Management of Wood A posteriori                                             100,000.00   0.00                 2019-02-15                 2019-03-08                2019-04-21                                          2019-05-21   2019-06-25   2019-12-22
                                                                                         qualifications des   International                         d'exécution
emplisseurs de gaz hors                       Fuels
                                                                                         consultants
dépôt




 BJ-PIU-68552-CS-INDV /
                                                                                         Sélection fondée
Recrutement d'un cabinet                      Component 4 : Sector
                                                                                         sur les              Open -                                En cours
pour l'étude sur la             IDA / 61050   Development and             A posteriori                                          150,000.00   0.00                 2019-01-31   2019-02-18    2019-02-21   2019-04-11   2019-04-06   2019-05-17                             2019-05-06   2019-06-19   2019-12-16
                                                                                         qualifications des   International                         d'exécution
sécurisation de la fourniture                 Implementation Support
                                                                                         consultants
en gaz au Bénin




                                                                                                                                                                                    Page 6
 BJ-PIU-68557-CS-INDV /
Recrutement d'un consultant                                                               Sélection fondée
                                               Component 1: Improvement
pour la réalisation de                                                                    sur les              Open -                                En attente
                                 IDA / 61050   of SBEE’s Commercial        A posteriori                                          200,000.00   0.00                 2019-01-31                 2019-02-21                2019-04-06   2019-05-06   2019-06-19   2019-09-17
l'enquête de référence de                                                                 qualifications des   International                         d'exécution
                                               Performance
satisfaction des clients de la                                                            consultants
SBEE




 BJ-PIU-36573-CS-CQS /
Recrutement d'un cabinet
                                                                                          Sélection fondée
pour l'élaboration et la mise                  Component 3: Community-
                                                                                          sur les                                                    En attente
en œuvre d'un plan de            IDA / 61050   Based Management of Wood A posteriori                           Open - National    60,000.00   0.00                 2019-06-17                 2019-07-08                2019-08-11   2019-09-10   2019-10-24   2020-04-21
                                                                                          qualifications des                                         d'exécution
communication sur la                           Fuels
                                                                                          consultants
normalisation des foyers
améliorés




 BJ-PIU-36572-CS-CQS /
Recrutement d'un cabinet
                                                                                          Sélection fondée
pour l'étude sur l'avant-                      Component 3: Community-
                                                                                          sur les              Open -                                En cours
projet de normes et              IDA / 61050   Based Management of Wood A posteriori                                             100,000.00   0.00                 2019-01-30   2019-02-25    2019-02-20   2019-08-07   2019-04-05   2019-05-05   2019-06-09   2019-12-06
                                                                                          qualifications des   International                         d'exécution
proposition d'une stratégie                    Fuels
                                                                                          consultants
pour l'organisation de la
filière "foyers améliorés"




 BJ-PIU-36566-CS-CQS /
Recrutement d'un cabinet                                                                  Sélection fondée
                                               Component 3: Community-
pour les études, la                                                                       sur les                                                    En cours
                                 IDA / 61050   Based Management of Wood A posteriori                           Open - National    30,000.00   0.00                 2019-01-31   2019-03-04    2019-02-21                2019-03-27   2019-04-26   2019-06-09   2019-12-06
supervision et le contrôle                                                                qualifications des                                         d'exécution
                                               Fuels
des travaux de construction                                                               consultants
du siège de la CoFOS




 BJ-PIU-36494-CS-QCBS /
Supervision et contrôle des
travaux de mise aux normes                                                                Sélection fondée
                                               Component 2: Distribution
des postes HT/MT des sous-                                                                sur les              Open -                                En cours
                                 IDA / 61050   Network Strengthening in    A posteriori                                          122,000.00   0.00                 2019-02-04   2020-01-13    2019-02-25   2020-03-20   2019-04-10   2019-04-25   2019-06-08   2020-06-02
stations de Dassa-Zounmè,                                                                 qualifications des   International                         d'exécution
                                               Targeted Areas
Glazoué, Paouignan et des                                                                 consultants
réseaux souterrains de la
ville de Porto-Novo




 BJ-PIU-36482-CS-QCBS /
Supervision et contrôle des
travaux de normalisation et
                                                                                          Sélection fondée
d'extension des réseaux de                     Component 2: Distribution
                                                                                          sur les              Open -                                En cours
distribution de la SBEE          IDA / 61050   Network Strengthening in    A posteriori                                          250,000.00   0.00                 2019-02-04   2020-01-13    2019-02-18   2020-03-20   2019-03-24   2019-04-23   2019-06-06   2020-05-31
                                                                                          qualifications des   International                         d'exécution
dans les quartiers                             Targeted Areas
                                                                                          consultants
périphériques des villes de
Cotonou, Porto-Novo,
Parakou et Natitingou




 BJ-PIU-95475-CS-CQS /
Mise à jour de l'étude
diagnostique institutionnelle
du ministère en charge de                                                                 Sélection fondée
                                               Component 4 : Sector
l'énergie, des structures                                                                 sur les                                                    En attente
                                 IDA / 61050   Development and             A posteriori                        Open - National   150,000.00   0.00                 2019-02-20                 2019-03-13                2019-04-11   2019-04-21   2019-05-31   2019-11-27
associées (cabinet du                                                                     qualifications des                                         d'exécution
                                               Implementation Support
Ministre, Direction Générale                                                              consultants
des Ressources Energétiques
(DGRE) ex DGE, ABERME,
, ARE)




 BJ-PIU-105019-CS-CQS /
Etude d'Impact
Environnemental des travaux
de construction d'un atelier                                                              Sélection fondée
                                               Component 4 : Sector
de réparation des                                                                         sur les                                                    En cours
                                 IDA / 61050   Development and             A posteriori                        Open - National   150,000.00   0.00                 2019-04-15   2019-03-18    2019-05-06   2019-08-07   2019-06-19   2019-07-19   2019-08-23   2020-02-19
transformateurs et                                                                        qualifications des                                         d'exécution
                                               Implementation Support
d'installation d'une machine                                                              consultants
de traitement d'huile au
profit de la SBEE à Abomey
Calavi




                                                                                                                                                                                     Page 7
 BJ-PIU-105034-CS-CQS /
Plans d'Actions de
Réinstallation des
Populations pour les Travaux
                                                                                         Sélection fondée
de Construction d'un Atelier                   Component 4 : Sector
                                                                                         sur les                                                    En cours
de Réparation des                IDA / 61050   Development and            A posteriori                        Open - National   150,000.00   0.00                 2019-04-15   2019-03-18    2019-05-06   2019-08-07   2019-06-19                             2019-07-19   2019-08-23   2020-02-19
                                                                                         qualifications des                                         d'exécution
Transformateurs et                             Implementation Support
                                                                                         consultants
d'Installation d'une Machine
de Traitement d' Huile au
profit de la SBEE à Abomey
Calavi




 BJ-PIU-105036-CS-CQS /
                                                                                         Sélection fondée
Etude d'impact                                 Component 4 : Sector
                                                                                         sur les                                                    En attente
environnemental et social        IDA / 61050   Development and            A posteriori                        Open - National    55,000.00   0.00                 2019-10-01                 2019-10-22                2019-12-05                             2020-01-04   2020-02-08   2020-08-06
                                                                                         qualifications des                                         d'exécution
des Travaux de Construction                    Implementation Support
                                                                                         consultants
du Siège de la CoFOS




 BJ-PIU-105041-CS-CQS /
Élaboration du Plans                                                                     Sélection fondée
                                               Component 4 : Sector
d'Actions de Réinstallation                                                              sur les                                                    En attente
                                 IDA / 61050   Development and            A posteriori                        Open - National    35,000.00   0.00                 2019-10-01                 2019-10-22                2019-12-05                             2020-01-04   2020-02-08   2020-08-06
des Populations des Travaux                                                              qualifications des                                         d'exécution
                                               Implementation Support
de Construction du Siège de                                                              consultants
la CoFOS




 BJ-PIU-105047-CS-CQS /
Étude d'impact
                                                                                         Sélection fondée
environnemental et social                      Component 4 : Sector
                                                                                         sur les                                                    En attente
des travaux de construction      IDA / 61050   Development and            A posteriori                        Open - National    35,000.00   0.00                 2019-10-01                 2019-10-22                2019-12-05                             2020-01-04   2020-02-08   2020-08-06
                                                                                         qualifications des                                         d'exécution
de 14 forages d'eau équipés                    Implementation Support
                                                                                         consultants
de pompe à motricité
humaine




 BJ-PIU-105049-CS-CQS /
Élaboration du Plan
                                                                                         Sélection fondée
d'Actions de Réinstallation                    Component 4 : Sector
                                                                                         sur les                                                    En attente
des Populations des Travaux      IDA / 61050   Development and            A posteriori                        Open - National    35,000.00   0.00                 2019-10-01                 2019-10-22                2019-12-05                             2020-01-04   2020-02-08   2020-08-06
                                                                                         qualifications des                                         d'exécution
de Construction de 14                          Implementation Support
                                                                                         consultants
forages équipés de pompe à
motricité humaine




 BJ-PIU-105052-CS-CQS /
Étude d'impact                                                                           Sélection fondée
                                               Component 4 : Sector
environnemental et social                                                                sur les                                                    En attente
                                 IDA / 61050   Development and            A posteriori                        Open - National    70,000.00   0.00                 2019-10-01                 2019-10-22                2019-12-05                             2020-01-04   2020-02-08   2020-08-06
des travaux de construction                                                              qualifications des                                         d'exécution
                                               Implementation Support
de 14 miellerie dans les                                                                 consultants
espaces CoForMO et CoFOS




 BJ-PIU-105054-CS-CQS /
Élaboration du Plan
                                                                                         Sélection fondée
d'Actions de Réinstallation                    Component 4 : Sector
                                                                                         sur les                                                    En attente
des Populations des Travaux      IDA / 61050   Development and            A posteriori                        Open - National    35,000.00   0.00                 2019-10-01                 2019-10-22                2019-12-05                             2020-01-04   2020-02-08   2020-08-06
                                                                                         qualifications des                                         d'exécution
de Construction de 14                          Implementation Support
                                                                                         consultants
Miellerie dans les espaces
CoForMO et CoFOS




 BJ-PIU-105391-CS-CQS /                                                                  Sélection fondée
                                               Component 4 : Sector
Audit du fonctionnement de                                                               sur les              Open -                                En cours
                                 IDA / 61050   Development and            A posteriori                                          200,000.00   0.00                 2019-05-06   2019-03-18    2019-05-27                2019-07-10                             2019-08-09   2019-09-13   2020-03-11
la Station de Vedoko en vue                                                              qualifications des   International                         d'exécution
                                               Implementation Support
de sa numérisation                                                                       consultants




 BJ-PIU-106345-CS-QCBS /
Etude et mise en place d'un                    Component 1: Improvement                  Sélection fondée
                                                                                                              Open -                                En cours
système de comptabilité          IDA / 61050   of SBEE’s Commercial       A posteriori   sur la qualité et                      350,000.00   0.00                 2019-04-03   2019-03-28    2019-04-24   2019-05-28   2019-06-07   2019-07-05   2019-08-04   2019-09-08   2019-10-22   2020-04-19
                                                                                                              International                         d'exécution
analytique au profit de la                     Performance                               le coût
SBEE




 BJ-PIU-150026-CS-CQS /                                                                  Sélection fondée
                                               Component 4 : Sector
Élaboration de la stratégie                                                              sur les              Open -                                En cours
                                 IDA / 61050   Development and            A posteriori                                          250,000.00   0.00                 2020-02-06   2019-12-16    2020-02-27   2020-01-24   2020-04-11                             2020-05-11   2020-06-15   2020-12-12
nationale d'électrification au                                                           qualifications des   International                         d'exécution
                                               Implementation Support
Bénin                                                                                    consultants




                                                                                                                                                                                    Page 8
 BJ-PIU-150027-CS-CQS /                                                                    Sélection fondée
                                               Component 4 : Sector
Etude sur les normes et                                                                    sur les              Open -                                                                 En cours
                               IDA / 61050     Development and             A posteriori                                                                200,000.00               0.00                    2020-02-10   2020-01-21    2020-03-02   2020-02-28   2020-04-15                                                                2020-05-15   2020-06-19   2020-12-16
Standard de distribution de                                                                qualifications des   International                                                          d'exécution
                                               Implementation Support
l'électricité au Bénin                                                                     consultants




 BJ-PIU-155075-CS-CQS /                                                                    Sélection fondée
                                               Component 4 : Sector
Mise à Jour du Plan de                                                                     sur les                                                                                     En cours
                               IDA / 61050     Development and             A posteriori                         Limited                                150,000.00               0.00                    2020-02-25   2020-02-07                              2020-03-10                                                                2020-04-09   2020-05-14   2020-11-10
Développement de Production                                                                qualifications des                                                                          d'exécution
                                               Implementation Support
à Moindre Coût (PDMC)                                                                      consultants




 BJ-PIU-172060-CS-CQS /
                                                                                           Sélection fondée
Mise en Ouvre d'activités de                   Component 4 : Sector
                                                                                           sur les                                                                                     En cours
Communication pour la          IDA / 61050     Development and             A posteriori                         Open - National                        100,000.00               0.00                    2020-07-02   2020-07-15    2020-07-23                2020-09-05                                                                2020-10-05   2020-11-09   2021-05-08
                                                                                           qualifications des                                                                          d'exécution
Visibilité des Actions du                      Implementation Support
                                                                                           consultants
PASE




INDIVIDUAL CONSULTANTS
Activity Reference No. /                                                                                                                                                                                                               Invitation to
                               Loan / Credit                                                                           Market     Contract Type    Estimated           Actual                                                                                  Draft Negotiated
            Description                               Component              Review Type        Method                                                                                 Process Status   Terms of Reference          Identified/Selected                                  Signed Contract         Contract Completion
                                     No.                                                                            Approach                      Amount (US$)      Amount (US$)                                                                                   Contract
                                                                                                                                                                                                                                        Consultant
                                                                                                                                                                                                        Planned       Actual       Planned       Actual      Planned       Actual      Planned       Actual      Planned      Actual


 BJ-PIU-36513-CS-INDV /
                                               Component 4 : Sector
Recrutement d'un consultant
                               IDA / 61050     Development and             A posteriori    Individuel           Open                                   150,000.00       108,403.31     Signé            2017-11-30   2018-01-26    2018-01-24   2018-05-15   2018-02-14   2018-06-18   2018-03-30   2018-09-21   2019-03-25
individuel pour l'audit
                                               Implementation Support
interne du PSAE




 BJ-PIU-36558-CS-INDV /
Recrutement d'un consultant
individuel chargé d'élaborer
                                               Component 1: Improvement
le plan d'amélioration de la                                                                                                                                                           En cours
                               IDA / 61050     of SBEE’s Commercial        A posteriori    Individuel           Open                                    50,000.00               0.00                    2017-12-15   2018-05-23    2018-02-02   2019-03-15   2018-02-23   2019-04-30   2018-04-08                2018-10-05
gestion de la SBEE, le                                                                                                                                                                 d'exécution
                                               Performance
cahier des charges et     le
DAO pour sa mise en
oeuvre




 BJ-PIU-68547-CS-INDV /
Recrutement d'un consultant
                                               Component 4 : Sector
individuel pour l'étude                                                                                                                                                                En cours
                               IDA / 61050     Development and             A posteriori    Individuel           Limited                                120,000.00        75,000.00                      2018-07-12   2018-08-08    2018-07-17   2018-11-22   2018-08-07   2019-02-28   2018-09-20   2019-05-21   2018-12-19
d'impact économique et                                                                                                                                                                 d'exécution
                                               Implementation Support
social de la fourniture
d'électricité au Bénin




 BJ-PIU-36586-CS-QBS /
Recrutement d'experts pour                     Component 4 : Sector
appuyer le cabinet du          IDA / 61050     Development and             A priori        Individuel           Open                                   350,000.00               0.00   Annulé           2018-09-03                 2018-10-22                2018-11-12                2018-12-17                2019-06-15
Ministère en charge de                         Implementation Support
l'énergie




 BJ-PIU-36588-CS-INDV /
Un consultant individuel
pour les PAR des travaux
d'extension des réseaux de
distribution de la SBEE
                                               Component 2: Distribution
dans les quartiers
                               IDA / 61050     Network Strengthening in    A posteriori    Individuel           Open                                    75,000.00               0.00   Annulé           2018-01-02   2018-06-01    2018-02-10                2018-03-03                2018-04-16                2018-10-13
périphériques de COTONOU,
                                               Targeted Areas
PORTO-NOVO, PARAKOU
ET NATITINGOU et          de
mise aux normes des postes
de DASSA, GLAZOUE et de
PAOUIGNAN




                                                                                                                                                                                                                          Page 9
 BJ-PIU-36587-CS-INDV /
Un consultant individuel
pour les EIES des travaux
d'extension des réseaux de
distribution de la SBEE
                                                Component 2: Distribution
dans les quartiers
                                  IDA / 61050   Network Strengthening in    A posteriori   Individuel        Open       75,000.00   0.00   Annulé        2018-01-02   2018-05-03    2018-02-10   2018-03-03   2018-04-16   2018-10-13
périphériques de COTONOU,
                                                Targeted Areas
PORTO-NOVO, PARAKOU
ET NATITINGOU et           de
mise aux normes des postes
de DASSA, GLAZOUE et de
PAOUIGNAN




 BJ-PIU-36514-CS-INDV /
Recrutement d'un consultant
individuel pour l'élaboration
                                                Component 1: Improvement
du cahier des    charges
                                  IDA / 61050   of SBEE’s Commercial        A posteriori   Individuel        Open      100,000.00   0.00   Annulé        2017-11-30   2018-01-19    2018-01-24   2018-02-14   2018-03-30   2018-09-26
relatives à la mise en place
                                                Performance
d'un centre d'appels à la
SBEE et suivi des
prestations




 BJ-PIU-68554-CS-INDV /
Recrutement d'un consultant
individuel pour la
                                                Component 4 : Sector
préparation d'un plan
                                  IDA / 61050   Development and             A posteriori   Individuel        Limited   120,000.00   0.00   Annulé        2019-01-25                 2019-01-30   2019-02-20   2019-04-05   2019-07-04
stratégique de développement
                                                Implementation Support
du secteur de l'énergie pour
les cinq (05) prochaines
années.




 BJ-PIU-36580-CS-CDS /
                                                Component 4 : Sector
Audit de fonctionnement du
                                  IDA / 61050   Development and             A posteriori   Individuel        Open      200,000.00   0.00   Annulé        2019-09-02                 2019-10-21   2019-11-11   2019-12-25   2020-06-22
poste de VEDOKO en vue
                                                Implementation Support
de sa numérisation




 BJ-PIU-36571-CS-INDV /
Recrutement d'un consultant
individuel pour la réalisation
                                                Component 3: Community-
d'une étude sur les chaînes                                                                                                                En cours
                                  IDA / 61050   Based Management of Wood A posteriori      Individuel        Limited    55,000.00   0.00                 2019-02-11   2019-09-19    2019-02-16   2019-03-09   2019-04-13   2019-07-12
de valeur de la filière                                                                                                                    d'exécution
                                                Fuels
apicole et d'une étude de
faisabilité pour l'installation
d'une miellerie centrale




 BJ-PIU-105056-CS-INDV /                        Component 4 : Sector
                                                                                                                                           En cours
Mise en place d'un site Web       IDA / 61050   Development and             A posteriori   Individuel        Limited    20,000.00   0.00                 2019-05-02   2019-05-24    2019-05-07   2019-05-28   2019-07-02   2019-12-29
                                                                                                                                           d'exécution
pour le PASE                                    Implementation Support




 BJ-PIU-36584-CS-QBS /
Mise à jour de l'étude
diagnostique institutionnelle
du ministère en charge de
                                                Component 4 : Sector                       Sélection de
l'énergie, des structures                                                                                                                  En attente
                                  IDA / 61050   Development and             A posteriori   consultants par   Direct    150,000.00   0.00                 2019-04-25                 2019-05-05                2019-07-18   2019-11-15
associées (cabinet du                                                                                                                      d'exécution
                                                Implementation Support                     entente directe
Ministre, Direction Générale
des Ressources Energétiques
(DGRE) ex DGE, ABERME,
, ARE)




 BJ-PIU-114724-CS-INDV /
Réalisation de l'audit de la
mise en œuvre du Plan
d'Actions de Réinstallation                     Component 4 : Sector
                                                                                                                                           En cours
(PAR) des populations             IDA / 61050   Development and             A posteriori   Individuel        Open       60,000.00   0.00                 2019-05-20   2019-05-28    2019-07-08   2019-07-29   2019-09-02   2019-10-07
                                                                                                                                           d'exécution
affectées du projet de                          Implementation Support
construction de la ligne 330
kv Ghana-Togo-Bénin (partie
béninoise des travaux)




                                                                                                                                                                          Page 10
 BJ-PIU-146740-CS-INDV /
                                              Component 4 : Sector
Etude d'impact Économique                                                                                                         En attente
                                IDA / 61050   Development and           A posteriori   Individuel   Open      120,000.00   0.00                 2020-01-15                 2020-03-04   2020-03-25   2020-04-29   2020-10-26
et Social de la Fourniture                                                                                                        d'exécution
                                              Implementation Support
d'Electricité au Bénin




 BJ-PIU-150028-CS-INDV /
Assistance au Ministère pour                  Component 4 : Sector
                                                                                                                                  En attente
l'élaboration et le suivi des   IDA / 61050   Development and           A posteriori   Individuel   Limited   120,000.00   0.00                 2020-03-16                 2020-03-21   2020-04-11   2020-05-16   2020-11-12
                                                                                                                                  d'exécution
tableaux de bord des Projets                  Implementation Support
du Secteur




 BJ-PIU-154001-CS-INDV /
Actualisation du Cadre
Procédural de gestion
durable des ressources
                                              Component 3: Community-
forestières dans les espaces                                                                                                      En cours
                                IDA / 61050   Based Management of Wood A posteriori    Individuel   Limited    20,000.00   0.00                 2020-02-20   2020-01-21    2020-02-25   2020-03-17   2020-04-21   2020-10-18
de la Communauté                                                                                                                  d'exécution
                                              Fuels
Forestière du Moyen Ouémé
(CoForMO) et de la
Communauté Forestière de
l’Ouémé Supérieur (CoFOS)




 BJ-PIU-150029-CS-CDS /
Sélection d'un Coordinateur                   Component 4 : Sector
                                                                                                                                  En cours
pour le Projet d'Amélioration   IDA / 61050   Development and           A posteriori   Individuel   Open      120,000.00   0.00                 2020-02-11   2020-02-25    2020-03-31   2020-04-21   2020-05-26   2020-11-22
                                                                                                                                  d'exécution
des Services Energétiques                     Implementation Support
(PASE)




 BJ-PIU-200619-CS-INDV /
                                              Component 4 : Sector
Sélection d'un auditeur                                                                                                           En attente
                                IDA / 61050   Development and           A posteriori   Individuel   Limited   100,000.00   0.00                 2020-11-19                 2020-11-24   2020-12-15   2021-01-19   2021-07-18
interne   du projet pour les                                                                                                      d'exécution
                                              Implementation Support
années 2021 et 2022




 BJ-PIU-205120-CS-INDV /
ELABORATION DU CADRE
DE POLITIQUE DE
                                              Component 4 : Sector
RÉINSTALLATION (CPR)                                                                                                              En attente
                                IDA / 61050   Development and           A posteriori   Individuel   Limited    35,000.00   0.00                 2020-12-14                 2020-12-19   2021-01-09   2021-02-13   2021-08-12
DU PROJET                                                                                                                         d'exécution
                                              Implementation Support
D’AUGMENTATION DE
L’ACCES A L’ELECTRICITE
(P2AE)




 BJ-PIU-205122-CS-INDV /
ÉLABORATION DU CADRE
DE GESTION
                                              Component 4 : Sector
ENVIRONNEMENTALE ET                                                                                                               En attente
                                IDA / 61050   Development and           A posteriori   Individuel   Limited    35,000.00   0.00                 2020-12-14                 2020-12-19   2021-01-09   2021-02-13   2021-08-12
SOCIALE DU PROJET                                                                                                                 d'exécution
                                              Implementation Support
D’AUGMENTATION DE
L’ACCES A L’ELECTRICITE
(P2AE)




                                                                                                                                                                 Page 11