SFG1798 GOVERNMENT OF BALOCHISTAN Social Impacts Assessment and Mitigation Plan Project Management Unit – BIWRMDP Balochistan Irrigation Department January, 2016 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) TABLE OF CONTENTS EXECUTIVE SUMMARY xii 1 INTRODUCTION 1 1.1 Project Background 1 1.2 Aims and Objectives 1 1.3 Scope 2 1.4 Review of Previous Studies 2 1.5 SIAMP Methodology 2 1.5.1 Tools of Data Collection 2 1.5.2 Data Collection 2 1.6 Study Team 3 1.7 Assessment & Reporting 3 1.7.1 Impact Assessment Process 3 1.7.2 Use of Engineering Drawings 3 1.7.3 Public Consultation 4 1.7.4 Objectives 4 1.8 Area of Influence 4 1.8.1 Corridor of Impact (CoI) 4 1.8.2 Right of Way (RoW) 4 1.8.3 Structure of SIAMP 4 2 ROJECT DESCRIPTION 5 2.1 Introduction 5 2.2 Sub-project Location & Description 5 2.2.1 GundachaSub-project 5 2.2.2 NimmiSub-project 6 2.2.3 Yatabad Sub-project 6 2.2.4 The Nari Gorge Integrated Sub-project 7 2.3 Administrative Setup of Porali River Basin 7 2.4 Administrative Setupof Nari River Basin 7 3 EXISTING IRRIGATION SYSTEM IN PORALI RIVER BASIN 15 3.1 Mode of Irrigation 15 3.1.1 GundachaSub-project 15 3.1.2 Nimmi Sub-project 15 3.2 Water Rights 15 3.2.1 Water Rights & Distribution on Porali River-Gundacha to Bara Bagh 15 3.2.2 Water Distribution on Gundacha Branch 15 3.3 Special Water Rights on Gundacha Branch 16 3.3.1 Role of District Administration in Water Distribution by Gundacha Branch 16 3.3.2 Water Distribution on Jamot Branch 16 3.3.3 Water Rights on Nimmi Sub-project 16 3.3.4 Water Rights &Distribution on Kannar Kareze 17 3.4 Land Quartile Distribution 17 3.4.1 Land Quartile on GundachaSub-project 17 3.4.2 Land Quartile on Nimmi Sub-project 17 3.5 Water & Land Rights in Nimmi Sub-project Area 18 3.5.1 No. of Water& Land Shareholders in Gundacha Sub-project Area 18 Page i Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 3.5.2 No. of Water & Land Shareholders in Nimmi Sub-project Area 19 3.6 Communal Land 19 3.7 Tenancy 20 3.8 Cropping Pattern 20 3.9 Operation & Maintenance 20 3.9.1 Maintenance of Diversion Structure & Conveyance System 20 3.9.2 After Project O&M 21 3.9.3 O&M of Infrastructures and FO’s Responsibility 21 3.9.4 Farmers’ Training on O&M 21 3.9.5 Purpose of farmers’ Training on O&M 21 4 SOCIOECONOMIC BASELINE AND PROFILE OF THE SUB-PROJECTS IN PORALI RIVER BASIN 22 4.1 SOCIO-ECONOMIIC PROFILE 22 4.1.1 Background of District Lasbela 22 4.1.2 Tribes & Ethnic Groups in the District 22 4.1.3 Religions in the District 22 4.1.4 Conflict Resolution Pattern in the District 22 4.1.5 Role, Position and Status of Women in the District 23 4.1.6 Population and Community Structure 23 4.1.7 Landless Households 27 4.1.8 Village Construction 27 4.1.9 Language in the Project Area 27 4.1.10 Religionin the Project Area 27 4.1.11 SocialInfrastructures in Gundacha Sub-project Area 27 4.1.12 SocialInfrastructures in Nimmi Sub-project Area 28 4.1.13 Education Facilities 28 4.1.14 Health Facilities 29 4.1.15 Drinking Water 30 4.1.16 Transport 31 4.1.17 NGOs Working in the Area 32 4.1.18 Flood Impacts 32 4.1.19 Community Awareness about Project 32 4.2 SOCIO-ECONOMIC BASELINE 32 4.2.1 Methodology 32 4.2.2 Basic Information of Respondent 33 4.2.3 Demography 34 4.2.4 Village Amenities 34 4.2.5 Fuel Resources 35 4.2.6 Family System 35 4.2.7 Marriage 35 4.2.8 Disease 35 4.2.9 Birth Rate 36 4.2.10 Death Rate 36 4.2.11 Money Lending 36 4.2.12 Visit to Nearest City 36 4.2.13 CommunityPriority Needs 36 4.2.14 Livestock 37 4.2.15 Livelihood& Income 37 Page ii Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 4.2.16 Anticipated Losses due to the Project 38 4.2.17 Housing 38 4.2.18 Landholding&Its Use 39 4.2.19 Agriculture Implements 40 4.2.20 Agriculture Inputs 40 4.2.21 Seasonal Earnings 40 4.2.22 Trees 41 4.2.23 Commercial Assets 41 5 PROJECT IMPACTSAND MITIGATION PLANNINGFOR SUB-PROJECTS IN PORALI river BASIN 42 5.1 Land Acquisition for Gundacha Sub-project 42 5.1.1 Gundacha Branch 42 5.1.2 Jamot Branch 44 5.1.3 Hingri& Nurg Weirs 45 5.2 Land Acquisition on Nimmi Sub-project 45 5.2.1 Width&Alignment of Existing Canal 46 5.2.2 Alignment of Main New Canal 46 5.2.3 Alignment of Kundi Minor 46 5.2.4 Alignment of Kishari Minor 46 5.2.5 Community Structures along RoW 46 5.2.6 Tree Inventory 47 5.3 Impact Assessment And Mitigation Measures 47 5.3.1 Land Acquisition& Resettlement on Gundacha Sub-project 47 5.3.2 Land Acquisition & Resettlement on Nimmi Sub-project 48 5.4 Memorandum of Understanding (MoU) on Land Donation 49 5.5 Possible Land NeedIssue and Approach to Address That 51 5.6 Indigenous peoples 51 6 CONSULTATION - COMMUNITY AND STAKEHOLDER’S ENGAGEMENT 52 6.1 Background 52 6.2 Objectives 52 6.3 Identification of the Stakeholders 52 6.3.1 PrimaryStakeholders 52 6.3.2 Secondary stakeholders 53 6.3.3 Key stakeholders 53 6.4 Methodology 53 6.5 Meetings with Stakeholders 53 6.5.1 Consultation with Farmers of Gundacha Branch 53 6.5.2 Consultation with Farmers of Jamot Branch 58 6.5.3 Consultation with Farmers of Hingri & Nurg Weirs 61 6.5.4 Consultation with Farmers of Nimmi Sub-project 62 7 EXISTING IRRIGATION SYSTEM ON NARI RIVER BASIN 65 7.1 Mode of Irrigation 65 7.1.1 Nari Gorge Sub-project 65 7.1.2 Yatabad Sub-project 65 7.2 Water Rights 65 7.2.1 Water Rights&Distribution on Nari Gorge Sub-project 65 7.2.2 Water Rights& Distribution on Yatabad Sub-project 65 Page iii Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 7.2.3 No. of Water& Land Shareholders on Nari Gorge Sub-project 65 7.2.4 No. of Water & Land Shareholders on Yatabad Sub-project 66 7.3 Communal Land 67 7.3.1 Communal Land on Nari GorgeSub-project 67 7.3.2 Communal Land on Yatabad Sub-project 67 7.4 Tenancy 67 7.4.1 Tenany on Nari GorgeSub-project 67 7.4.2 Tenancy on YatabadSub-project 68 7.5 Cropping Pattern 68 7.6 Operation & Maintenance 69 7.7 Operation& Maintenance 69 7.7.1 O&M On Nari Gorge Sub-project 69 7.7.2 O&M On YatabadSub-project 69 8 SCOIOECONOMICPROFILE AND BASELINE OF SUB-PROJECTS IN NARI RIVER BASIN 70 8.1 SOCIOECONOMIC PROFILE 70 8.1.1 Populationand Community Structure 70 8.1.2 Village Type 72 8.1.3 Languages 72 8.1.4 Religion 73 8.1.5 SocialInfrastructures in the Area 73 8.1.6 Education Facilities 73 8.1.7 Health Facilities 74 8.1.8 Drinking Water 74 8.1.9 Transport 74 8.1.10 NGOs Working in the Area 75 8.1.11 Floods Impacts 75 8.1.12 Community Awareness about Project 75 8.2 SOCIOECONOMIC BASELINE OF NARI RIVER BASIN 75 8.2.1 Methodology 75 8.2.2 Basic Information of Respondent 76 8.2.3 Demography 77 8.2.4 Village Amenities 77 8.2.5 Fuel Resources 77 8.2.6 Family System 79 8.2.7 Marriage 80 8.2.8 Disease 80 8.2.9 Treatment Places 80 8.2.10 Birth Rate 81 8.2.11 Death Causes 81 8.2.12 Money Lending 81 8.2.13 Visit to Nearest City 81 8.2.14 Community Priority Needs 81 8.2.15 Livestock 81 8.2.16 Livelihood& Income 83 8.2.17 Anticipated Losses due to Project 83 8.2.18 Housing 83 8.2.19 Landholding& Use 84 Page iv Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 8.2.20 Agriculture Implements 85 8.2.21 Agriculture Inputs 85 8.2.22 Seasonal Earnings 86 8.2.23 Trees on Nari Gorge Sub-project 87 8.2.24 Trees on Yatabad Sub-project 87 8.2.25 Commercial Assets 87 9 Social IMPACTS& MITIGATION PLANNING IN NARI RIVER BASIN 88 9.1 Land Acquisition for Nari Gorge Sub-project 88 9.1.1 Tree Inventory 88 9.1.2 Existing Sectionsof Canal 88 9.1.3 Conclusion 89 9.2 Land Acquisition for Yat Abad Sub-project 90 9.2.1 Yat Abad 90 9.2.2 Tree Inventory 90 9.2.3 Existing Sections of Canal 93 9.2.4 Impact Assessment And Mitigation Measures 94 10 ENGAGEMENT OF COMMUNITY & STAKEHOLDERS IN NARI RIVER BASIN 95 10.1 Consultation on Nari Gorge Sub-project 95 10.1.1 Consultation with Farmers of Nari Gorge Sub-projectKhajak village 95 10.1.2 Consultation with Farmers of Luni main and Ralla, Ralla 1 & 2 branchs, Budra Nullah, Rarhe Nullah and Bagh Nullah 1 & 2. 96 10.1.3 Consultation withFarmers of Marghzani canal and Branches 97 10.1.4 Consultation with Farmers of Dephal canal and Branches 98 10.1.5 Consultation with Farmers of Kurak canal and Branches 99 10.2 Consultation on Yatabad Sub-project 100 10.2.1 Consultation with Farmers of Yat Abad Manzaki, Basharat Manzaki and Jahangeer Shore Branches 100 10.2.2 Consultation with Farmers of Branch 5, 6, 7 and 8. 102 10.2.3 Consultation with Farmers of Branch No.of 9 & 10 of Ismail Shahar 103 11 RESETTLEMENT POLICY FRAMEWORK (RPF) FOR BIWRMDP 106 11.1 Introduction 106 11.2 Purpose of the Policy Framework 106 11.3 Scope and Triggers 106 11.4 Policy & Legal Framework 107 11.4.1 The Land Acquisition (LAA) Act 1894 107 11.4.2 Resettlement Policy Framework 108 11.4.3 World Bank Resettlement Operational Policy (OP 4.12) 108 11.4.4 110 Comparison of Pakistan and World Bank Resettlement Policy 110 12 Eligibility and Entitlement Criteria 112 12.1 Category of Displaced Person 112 12.1.1 Affected Individual 112 12.1.2 Affected Household 112 12.1.3 Affected Local Community 112 12.1.4 Vulnerable Households 112 12.2 Eligibility Criteria 113 12.3 Method to Determine the Cut – Off Dates 113 12.4 Entitlements 113 Page v Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 12.4.1 Land Needs and Community Contribution 114 12.4.2 Implementation Needs 115 12.4.3 Compensation for Government Owned Land and Fixed Assets 115 13 GRIEVANCE REDRESS MECHANISM 117 13.1 General 117 13.2 Objectives of Grievance Redress Mechanism 117 13.3 Principles, Procedures and Timelines 118 13.4 Recording and Monitoring 118 13.5 Dissemination 119 13.6 Proposed Mechanism for Grievance Redress under BIWRMDP 119 13.7 Public Complaints Centre 119 13.8 Grievance Redress Committee (GRC) 120 13.9 Grievance Focal Points (GFPs) 120 13.10 Role and Responsibilities of PCC 120 13.11 GRM Steps and Timeframe 120 13.12 Reporting 121 14 Institutional Arrangements and Costs 122 14.1 Management Set-up 122 14.1.1 Social Management Unit 122 14.1.2 Monitoring And Evaluation 122 14.1.3 SIAMP Implementation Management Cost 123 14.1.4 Staffing 123 14.1.5 Resettlement Cost 124 Page vi Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) LIST OF TABLES Table 1.1: The SIAMP Team for Porali River Basin ............................................................................... 3 Table 1.2: The SIAMP Team for Nari River Basin ................................................................................. 3 Table 1.3: Engineering Team ................................................................................................................. 3 Table 1.4: Engineering Team ................................................................................................................. 3 Table 2.1: Proposed Structures on Nimmi Scheme ............................................................................... 6 Table 2.2: Detail of Main and Branch Canals ......................................................................................... 7 Table 3.1: Main Water Distribution through Porali River ...................................................................... 15 Table 3.2: Water Distribution through Gundacha Branch .................................................................... 16 Table 3.3: Detail of land distribution in Gundacha Sub-project Area ................................................... 17 Table 3.4: Detail of land distribution in Nimmi Sub-project Area.......................................................... 17 Table 3.5: No. of Water & Land Shareholders on Existing Irrigation System ...................................... 19 Table 3.6: No. of Water & Land Shareholders on Proposed Irrigation System ................................... 19 Table 4.1: Population & Community Structure ..................................................................................... 23 Table 4.2: Population & Community Structure ..................................................................................... 25 Table 4.3: Population & Community Structure ..................................................................................... 26 Table 4.4: Tribal Strength in Project Area ............................................................................................ 26 Table 4.5: Landless Households in Project Area ................................................................................. 27 Table 4.6: Public & Communal Infrastructures in Project Area ............................................................ 28 Table 4.7: Village wise Educational Facilities in the Gundacha Sub-project Area............................... 28 Table 4.8: Education Facilities in Nimmi Sub-project Area .................................................................. 29 Table 4.9: Health Facilities in the Gundacha Sub-project Area ........................................................... 29 Table 4.10: Drinking Water Resources in the Gundacha Sub-project Area .......................................... 30 Table 4.11: Drinking Water Resources in Project Area ......................................................................... 31 Table 4.12: Age Groups of the Respondents ......................................................................................... 33 Table 4.13: Relationship of the Respondent’s with Head of Household ................................................ 33 Table 4.14: Tribal Representation in the Baseline Survey of Gundacha Sub-project............................ 33 Table 4.15: Tribal Representation in the Baseline Survey of Nimmi Sub-project .................................. 34 Table 4.16: Relationship of the Respondent’s with Head of Household ................................................ 34 Table 4.17: Average Family Size ........................................................................................................... 34 Table 4.18: Family System in the Project Area ...................................................................................... 35 Table 4.19: Family System in the Project Area ...................................................................................... 35 Table 4.20: Illness reported during last 1 Year ...................................................................................... 36 Table 4.21: Treatment Place .................................................................................................................. 36 Table 4.22: Purpose of the Visit to nearest City ..................................................................................... 36 Table 4.23: Community Priority Need on Gundacha Sub-project .......................................................... 36 Table 4.24: Average No & Type of Livestock Ownership in the Project Area ........................................ 37 Table 4.25: Average No & Type of Livestock Ownership in the Project Area ........................................ 37 Table 4.26: Monthly Average Domestic Expenditures in the Project Area ............................................ 38 Table 4.27: Anticipated Losses in the Project Area ............................................................................... 38 Table 4.28: Average No & Type of Livestock Ownership in the Project Area ........................................ 38 Table 4.29: Bathroom Ownership in the Project Area ............................................................................ 39 Table 4.30: Plot Size in the Project Area ............................................................................................... 39 Table 4.31: Individual Land ownership in the Project Area .................................................................... 39 Table 4.32: Land type to be Affected ..................................................................................................... 39 Table 4.33: Type of Agriculture Implements Owned by Farmers........................................................... 40 Table 4.34: Estimated Expenses Per Year/Acre .................................................................................... 40 Table 4.35: Average Seasonal Earnings/acre in Project Area ............................................................... 40 Table 5.1: Community Structures near to the RoW ............................................................................. 42 Table 5.2: Tree Inventory on Gundacha Branch .................................................................................. 43 Table 5.3: Tree Inventory on Jamot Branch ......................................................................................... 44 Table 5.4: Community Structures near to the RoW ............................................................................. 46 Table 6.1: Consultation with the Communities and their Views at Gundacha Branch ......................... 54 Page vii Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Table 6.2: List of Farmers Consulted on 5th September, 2015 ............................................................ 54 Table 6.3: Consultation with the Communities and their Views at Gundacha Branch ......................... 58 Table 6.4: List of Farmers Consulted Jamot Branch (Excluding 9th October,2015) ............................. 61 Table 6.5: Consultation with the Communities and their Views at Hingri/Nurg Weirs ......................... 61 Table 6.6: List of Farmers Consulted on Hingri/Nurg ........................................................................... 61 Table 6.7: Consultation with the Communities and their Views at Nimmi ............................................ 62 Table 6.8: List of Farmers Consulted at Nimmi Sub-project in September, 2015 ................................ 63 Table 7.1: No of Water & Land Shareholders ...................................................................................... 66 Table 7.2: No. of Water & Land Shareholders ..................................................................................... 66 Table 7.3: Tenancy arrangements in Khushkaba farming of Nari Gorge package of Schemes .......... 67 Table 7.4: Tenancy arrangements in Sailaba farming of Nari Gorge package of Scheme ................. 67 Table 7.5: Tenancy arrangements in perennial irrigation of the Nari Gorge package of schemes...... 68 Table 7.6: Tenancy arrangements in Khushkaba farming of YatabadSub-project .............................. 68 Table 7.7: Tenancy arrangements in tube wells irrigation of YatabadSub-project .............................. 68 Table 7.8: Cropping Pattern in the Project Area .................................................................................. 68 Table 8.1: Family Structure of Nari Gorge Sub-project ........................................................................ 70 Table 8.2: Tribe and Clan-wise Population Data of Nari GorgeScheme ............................................. 70 Table 8.3: Population & Community Structure ..................................................................................... 71 Table 8.4: Tribe and clan-wise population data of Yatabad integrated Sub-project ............................ 71 Table 8.5: Village Type in Nari Gorge Sub-project .............................................................................. 72 Table 8.6: Village Type in Yatabad Integrated Sub-project ................................................................. 72 Table 8.7: Education Facilities in Nari Gorge Package of Schemes ................................................... 73 Table 8.8: Education Facilities in Nari Gorge Package of Schemes ................................................... 74 Table 8.9: Transport facilities of Nari Gorge Sub-project ..................................................................... 74 Table 8.10: Transport Ownership of Yatabad scheme .......................................................................... 75 Table 8.11: Age of the Respondents ...................................................................................................... 76 Table 8.12: Tribal Representation in Nari Gorge Sub-project Area ....................................................... 76 Table 8.13: Tribal Representation in Yatabad Sub-project Area ........................................................... 76 Table 8.14: Education Level ................................................................................................................... 77 Table 8.15: Average Family Size ........................................................................................................... 77 Table 8.16: Fuel Resources in the Marghzani village of Project Area ................................................... 78 Table 8.17: Fuel Resources in Yatabad Sub-project Area ..................................................................... 78 Table 8.18: Family System in the Project Area ...................................................................................... 79 Table 8.19: Marriage System in the Nari-Gorge Sub-project Area ........................................................ 80 Table 8.20: Illness reported during last 1 Year ...................................................................................... 80 Table 8.21: Treatment Place in Nari Gorge Sub-project Area ............................................................... 80 Table 8.22: Treatment Place in Yatabad Sub-project Area ................................................................... 80 Table 8.23: Causes of Death.................................................................................................................. 81 Table 8.24: Purpose of the Visit to nearest City ..................................................................................... 81 Table 8.25: Average No.& Type of Livestock Ownership in the Nari Gorge Sub-project Area .............. 82 Table 8.26: Average No.& Type of Livestock Ownership in the Yatabad Sub-project Area .................. 82 Table 8.27: Average values Type of Livestock in the Nari Gorge Sub-project Area.............................. 82 Table 8.28: Average No & Type of Livestock Ownership in the Yatabad Sub- Project Area ................ 83 Table 8.29: Anticipate Losses due to Project ......................................................................................... 83 Table 8.30: Ownership of Rooms in Project Area .................................................................................. 84 Table 8.31: Plot Size in the Nari Gorge Sub-project Area ..................................................................... 84 Table 8.32: Plot Size in the Yatabad Sub-project Area .......................................................................... 84 Table 8.33: Land use systems of Nari GorgeSub-project ...................................................................... 84 Table 8.34: Land use systems of YatabadSub-project .......................................................................... 85 Table 8.35: Land use systems of YatabadSub-project .......................................................................... 85 Table 8.36: Type of Agriculture Tools and Machinary Owned by Farmers in th Project Area ............... 85 Table 8.37: Estimated Expenses per Year/ Acre on Nari Gorge Sub-project Area ............................... 86 Table 8.38: Estimated Expenses Per Year/ Acre in Yatabad Sub-project Area .................................... 86 Table 8.39: AverageSeasonal Earnings/acre in Nari Gorge Sub- Project Area .................................... 86 Page viii Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Table 8.40: AverageSeasonal Earnings/acre in Yatabad Sub-project Area .......................................... 86 Table 8.41: Branch wise number of Trees on Nari Gorge Sub-project Area ......................................... 87 Table 9.1: Branch wise Land Acquisition ............................................................................................. 88 Table 9.2: Tree Inventory on Yatabad Main Canal .............................................................................. 90 Table 9.3: Tree Inventory on Yatabad Branch Canal No. 1 ........................................................................ 91 Table 9.4: Tree Inventory on Yatabad Branch Canal No. 2 ................................................................. 92 Table 9.5: Tree Inventory on Yatabad Branch Canal No. 3 ................................................................. 92 Table 9.6: Tree Inventory on Yatabad Branch Canal No. 4 ................................................................. 92 Table 9.7: Tree Inventory on Yatabad Branch Canal No. 5 ................................................................. 93 Table 9.8: Branch wise Detail of Yatabad Irrigation Scheme ............................................................... 93 Table 10.1: Consultation with the Communities and their Views at Nari Gorge Sub-project ................. 95 Table 10.2: List of Farmers Consulted on 3rd and 4th October, 2015 Killi Khajak ................................ 95 Table 10.3: Consultation with the Communities of Luni Village ............................................................. 96 Table 10.4: List of Farmers Consulted on 5thand 6thOctober, 2015 ....................................................... 97 Table 10.5: List of Farmers Consulted in 5th &b 7th October, 2015 ...................................................... 97 Table 10.6: List of Farmers Consulted on 10th and 11th September, 2015 .......................................... 98 Table 10.7: List of Farmers Consulted in Dehpal Village on 7th & 10th and 11th September, 2015 .... 98 Table 10.8: List of Farmers Consulted on 9th and 10th October, 2015 ................................................. 99 Table 10.9: List of Farmers Consulted on 11th and 12th October, 2015 ............................................... 99 Table 10.10: List of Farmers Consulted on 11th and 12th October, 2015 ......................................... 100 Table 10.11: Consultation with the Communities and their Views at Yatabad scheme ..................... 101 Table 10.12: List of Farmers Consulted on 6thand 7thSeptember, 2015 ........................................... 101 Table 10.13: Consultation with the Communities and their Views at Branch No. 6,7 and 8 Yatabad 102 Table 10.14: List of Farmers Consulted on 8th and 9th September, 2015 ........................................ 102 Table 10.15: Consultation with the Communities Sardar Shahar, Gaman Shahar and Killi Abdullah Yatabad 103 Table 10.16: List of Farmers Consulted on 10th and 11th September, 2015 .................................... 103 Table 11.1: Comparison of LAA and Remedial Measures to Bridge the Gap ..................................... 111 Table 14.1: Approximate Budget for SEMMP & RAP Implementation................................................. 123 LIST OF FIGURES Figure 2.1: Key Plan of Gundacha-Nurg Hingri Sub-project ................................................................... 9 Figure 2.2: Nimmi Sub-project Location Map ........................................................................................ 10 Figure 2.3: Key Plan of Nimmi Sub-project ........................................................................................... 11 Figure 2.4: Location of Yatabad Sub-project ......................................................................................... 12 Figure 2.5: Location map of Nari Gorge Integrated Sub-project ........................................................... 13 Figure 5.1: MoU for Land Donation ....................................................................................................... 50 Figure 6.1: Agreement of Gundacha Branch Farmers .......................................................................... 57 Figure 6.2: Agreement of Jamot Branch Farmers ................................................................................. 60 LIST OF ANNEXURES Annexure A: Terms of Reference (Tors) Resettlement Planning Preparation Annexure B: Balochistan Integrated Water Resources Management and Development Project Annexure C: List of Water & La nnd Shareholders of Gundacha Branch Annexure D: List of Water & Land Shareholders of Nimmi Sub-Project Annexure E: Loni Village (Nari Gorge) Annexure F: Annexure G: Land to be acquired for Main Canal of Yatabad Integrated Scheme Annexure H: Gender Action Plan Page ix Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) ACRONYMS BIWRDP Balochistan Integrated Water Resources Development Project BCIAP Balochistan Community Irrigation& Agriculture Project BHU Basic Health Unit BID Balochistan Irrigation Department BIDA Balochistan Irrigation & Drainage Authority BMIADP Balochistan Minor Irrigation and Agriculture Development Project BSSIP Balochistan Small Scale Irrigation Project BMIADP Balochistan Minor Irrigation & Agriculture Project CBOs Community Based Organizations CCA Culturable Command Area CIFO Community Irrigation Farmer’s Organization CISU Community Irrigation Services Unit CoI Corridor of Impacts DC Deputy Commissioner EHS Environment, Health & Safety Guidelines ESMU Environmental & Social Management Unit FGDs Focus Group Discussions FOs Farmers Organizations GAP Gender Action Plan GFPs Grievance Focal Points GNHIS Gundacha,Nurg/Hingri Irrigation Scheme GRC Grievance Redress Committee GRM Grievance Redress Committee GRS Grievance Redressal System Km Kilo Meter LPG Liquid Petrolium Gas M&ECs Monitoring & Evaluation Consultants NGO Non Government Organization NRS National Rural Support Program O&M Operation & Maintenance OP Operational Policy P&D Planning & Development Department PAPs Project Affected Persons PCC Public Complaint Centre PD Project Director PEPA Pakistan Environmental Protection Act/Agency PHE Public Health Engineering PIC Project Implementation Consultants PMU Project Monitoring Unit PSC Project Steering Committee RAP Resettlement Action Plan RHC Rural Health Centre RoW Right of Way RPF Resettlement Policy Framework SEMP Social & Environmental Management Plan SEMMP Social & Environmental Management & Monitoring Plan Page x Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) SIA Social Impacts Assessment SIAMP Social Impacts & Management Plan TOR Terms of Reference VLD Voluntary Land Donation WB World Bank Page xi Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) EXECUTIVE SUMMARY PROJECT BACKGROUND Water situation in Balochistan is acute as a whole; the province is out of Indus Basin Irrigation System and largely depends on small perennial flows in ephemeral rivers and seasonal short duration floods. Balochistan often faces severe drought conditions and water availability is drastically reduced during extended droughts which lead to high marginality in income and livelihood means. The storage facilities are inadequate for both surface and ground water and the poor conditions of canal and water structures require urgent rehabilitation and regular maintenance. The lack of adequate water storage capacities, flood retention areas as well as flood protection embankments led to the experience of high damages. Urgent efforts and investments are required for rehabilitation of its water infrastructure, water conservation and retention of flood water. Therefore; The Government of Balochistan has proposed to adopt an Integrated Water Resources Management approach to address the above challenges. The government has requested financial support from the World Bank for the Balochistan Integrated Water Resources Management and Development Project. SOCIO-ECONOMIC BASELINE Water Distribution & Water Rights Porali River Basin The water rights on the perennial water which is commonly known as “Aab-E-SIAH” is well defined at the branch canal level among the beneficiaries in the project area. The branch as well as village level distribution is expressed in fixed time share of original cycle of 30 days. The water share of the target branches, Gundacha and Jamot are 7 and 2 days, respectively. There are downstream users of the perennial flow of Porali River as well as Kannar Kareze flow. The Kannar Kareze is located downstream of the proposed Weir. As reported by the community over Nimmi scheme, Sher Muhammad Goth, Jani Goth, Sour Dir and Kundi villages have no water share in Kannar Kareze. Only the Langra and Kishari Goths have the entitlement of water share in the Kannar Kareze. In Proali River Basin, two sub-projects are selected to execute in Year 1 naming Gundacha-Nung Hingri and Nimmi. There are two types of land and water rights on the proposed sub-projects;  One is the farmers of Sher Muhammad 1Goth, Jani, Nimmi Bent, Sour Dir, Kundi and Kishari villages who are settled along the bank of Porali River and practicing irrigation for many years through diverting the perennial flow as well as flood water (on need basis) of the Porali River.  The other is the additional areas which are considered to be commanded under the proposed Sub-project which is owned by the same villages (except Jani & Sher Muhammad Goth) including the villages Hbib and Ibrahim Siapad. Nari River Basin In Nari River Basin, two sub-projects are selected to execute in Year 1 namingNari Gorge and Yatabad. The farmers have rights to install the lift irrigation system on Anambar River (Nari) to lift the water to irrigate their land. At the time of visit, there were about 35 pumping units installed and were functioning. While, the floodwater is utilized on a minor scale in the area and there is no 1 Village. Page xii Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) existing water distribution system. During the consultation, the communities of the area were of the view that the water share should be based on land holding basis. Land Rights Quartile Distribution Porali River Basin Survey results on Gundacha sub-project reveal that 63.29%(upper quartile) of largest land shareholding amongst beneficiary households and lower quartile ownership is 5.63% of the land in the project area. Survey also reveals that 54.23% of largest land shareholding amongst beneficiary households own (upper quartile) and lower quartile own 9.26% of the land in the Nimmi project area. Nari River Basin The quartile distribution at Nari Gorge sub-project is 64.72% (upper quartile) of largest land shareholding amongst beneficiary households and lower quartile is 3.74% of the land in the project area. Number of Water & Land Shareholders Porali River Basin According to the results of the survey, the total number of water and land shareholders on Gundacha Sub-project are 333 having estimated population of 3,474 souls out of which male and female share is 1,707 and 1,760. Over Nimmi sub-project, an inventory of 123 water and land shareholders under the existing irrigation hasbeen prepared. While there are 233 water and land shareholders for the proposed irrigation system after RD:3+000 have been prepared. Nari River Basin There are total of 539 households at Nari Gorge Sub-project settled in the 9 villages. There are 674 shareholding households settled in the 22 villages at Yatabad sub-project. All the households own irrigated land and have water rights in the sub-project’s areaexcept 21 households. Communal Land Porali River Basin There is no communal land in the command of Gudacha sub-project while in case of Nimmi sub- project, only the strip of land located along the banks of Porali River is distributed among the farmers. After RD:3+000 of the proposed irrigation canal, the land is considered communal on the community level while on Government level, it is considered government property. Nari River Basin More than 22% of the total area of the Nari Gorge sub-project is used as rangeland and grazing rights belong to communities living around. Due to communal ownership, usually these are accessible to all members of the community and also to nomads passing through the area on their traditional routes of migration to plain areas. There is no restriction on the number, type, season and period/duration of grazing. At Yatabad sub-project, all the cultivated land is distributed among the individual families and the land titles have been registered under the name ofMoza Sadat Shore, Moza Sahara Ismail Shore, Moza Karazat Ismail Shore and Moza Shadozaiof Tehsil Duki and District Loralai with the Revenue Department, Government of Baluchistan. As surveyed, in the original command of Yatabad, each clan has proportionate size of land in the communal land (Shamillat) which is not distributed yet due to shortage of irrigation water. Page xiii Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Population & community Structure Porali River Basin The results of the baseline survey on Gundacha sub-project reveals that the tribal representation is as Roonja 44%,Sian 16%,Khaskheli 13.3%,Bizenjo 4%,Mengal and Jamot 2.7%,Bandija 9.3% and Siapad 1.3% while the tribal representation on Nimmi Sub-project is as Roonja 44%,Sian 16%,Khaskheli 13.3%,Bizenjo 4%,Mengal and Jamot 2.7%,Bandija 9.3% and Siapad 1.3%. Nari River Basin The total population of Nari Gorge package of schemes is 5387, all belonging to the different sub- clans of Khajak, Dephal, Luni, Marghzani, Tareen, Safi and Rind tribes of Pashtun and Baloch. There are total of 539 households in the 9 villages, of which 55 households belong to Dephal and Rind Baloch which are located in Dephal village, 63 families of Baloch Rind are in Ghulam Bolak, 47 families of Barozai are in Kurak, 35 household of marghzani are in Marghzani village, 20 mizri families are in Mizri, 11 safi are in Safi village, 81of Luni tribe are in Luni village, 32 in Gulo Sher and all other 195 families of Khajak, Davi, Mohammadzai and Syed are in Khajak village. In addition to the land owner, about 1000 household resides as tenant in the project area. All households and particularly small water shareholders will benefit from the package of schemes development. Total population of Yatabad is 7,093, all belonging to the Musyani sub-clans of Tareen, Shadozai of Kakar, Loni and Ustrani tribes of Pashtun and Buzdar of Baloch are dwelling in the Sub-project area. Total households are 674 in the 22 villages. Pashto is the main language in the Sub-project area though most men can also speak Urdu and Saraiki. All, except 21 households, own irrigated land and have water rights in the Sub-project’s area. All households and particularly small water shareholders will benefit from Sub-project. Education Level Porali River Basin The socio-economic baseline survey reveals that 55% of the respondents were illiterate, just over 8.3% of the respondent’s education level was primary, 34.9% respondent’s education level was middle and0.9% respondent’s education level was secondary and 32.1% were of the university level. Nari River Basin At Nari Gorge sub-project, 27.6% of the respondents were illiterate, just over 42.5% of the respondent’s education level was primary, 18.1% respondent’s education level was Secondary and 6.3% respondent’s education level was in high school and university level are 5.5. At Yatabad sub-project, 30.9% of the respondents were illiterate, just over 14.4% of the respondent’s education level was primary, 26.6% respondent’s education level was Secondary and 19.4% respondent’s education level was in high school and university level are 8.6. Language & Religion Porali River Basin All the population is Muslim.The languages spoken in the area are Sindhi/Lasi, Balochi and Brahvi. The Urdu is also understandable and spoken in the area. The Sindhi/Lasi language is the dominant language spoken in the project area about 95 percent of the population speaks. Nari River Basin Pashto, Sindhi and Balochi are the main languages in the Narai Gorge sub-project area though most men and women can also speak Urdu. In case of Yatabad Sub-project area, Pashto, Brahvi Page xiv Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) and Urdu are the languages spoken. The Pashto language is the dominant language spoken in the project area which 100 percent of the population speaks. Education Facilities Porali River Basin There are 14 functional boys primary schools, 05 girls primary schools, 01 middle boys middle school and no high school in the Gundacha Sub-project area. The students go for higher studies to Lasbela city, Quetta and Karachi.There are 4 boys primary schools, 03 Girls primary schools and no middle school or high school in the project area. The students go for higher studies to Lasbela city, Quetta and Karachi. Nari River Basin There are 24 primary schools (12 boys and 12 girls), 2 middle schools (1 boys and 1 girls) and one 6 high schools (3boys and 3girls) in the project area.There is one boys High School, 14 Primary schools for boys and 12 primary schools for girls which are functional in Yatabad integrated scheme area in which there are 16 teachers for high school, 40 for all primary schools, in which approximately 1500 enrolment of boys and girls reported. Quality of education and infrastructures are fair as reported by the communities. Boys and girls collages are at a distance of 21 km in Duki town. Health Facilities Porali River Basin Only one functional Basic Health Unit (BHU) was reported in the Omar Goth on Gundacha branch and in the remaining areas, there was not any health facility. The people are going to Lasbela city and for more treatment they refer their patients to Karachi. There is no health facility in the project area of Nimmi. Nari River Basin There is one Rural Health Center (RHC), three Basic Health Units (BHUs) and a dispensary within the sub-project’s area and all are functional. Lady Health Workers are available only in Luni village, while the serious patients are taken for treatment to Sibi district hospital which is 10 kms away from thesub-project. Only Rural Health Centre (RHC) is located in the Yatabad sub-project area for general treatment. The RHC is functional as stated by the women community. Lady health worker is also available. Health coverage seems reasonable for the routine treatments. Drinking Water Porali River Basin Survey results of Gundacha sub-project reveals that there are 02 tube wells, 03 dug wells, 02 water tanks and 01 natural spring and the water of the said sources is used conjunctively with canal water for drinking purpose. Out of 02 tube wells, one was reported defunct.Survey results of Nimmi sub-project is indicating that there are 02 dug wells, 02 water tanks and the remaining villages are using canal water for drinking purpose. In overall; the villagers are using the surface water of canal for drinking, livestock and other domestic use. Page xv Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Nari River Basin In the villages of the Nari Gorge sub-project area, water supply schemes are developed by PHE Department with networking and all are functional. The O&M of these schemes are responsibility of PHE department. The other source of drinking water is channel water. About 84% households have their own piped water system at home in the Yatabad Sub-project area. While around 16% household fetch water from channels and tube wells. Only 34% of women make water safer for drinking by boiling. Around 91% women and 57% children respectively go outside their homes for fetching of water for domestic uses. Family System Porali River Basin The baseline study reveals that about 72% of those in the study area live together with their extended family (parents living with married children and their families). Families believe this is a more economical way of living as they often work together on the same land and are able to share their joint incomes to support the entire family, including elderly relatives who are unable to work. About 28% of the population is living in nuclear family system. Nari River Basin About 64.7% of those in the study area live together with their extended family (parents living with married children and their families). Families believe this is a more economical way of living as they often work together on the same land and are able to share their joint incomes to support the entire family, including elderly relatives who are unable to work. About 35.3% of the population is living in nuclear family system. Family Size Porali River Basin The survey data in the Table 4.6 and as portrayed in the graphs below reveals that the average family size 1-5 is 53.2%, 5-10 is 11%, 10-15 is 8.3% and above 15 is 9.2% in the project area. Nari River Basin The survey data reveals that the average family size 1-5 is 11.3%, 5-10 is 59.0%, and 10-15 is 24.8% and above 15 is 4.9% in the project area. GENDER ACTION PLAN The Project Gender Strategy comprising of a detailed gender analysis and a comprehensive Gender Acton Plan (GAP) has been prepared for BIWRMDP and is given as Annexure-H. COMMUNITY AWARENESS ABOUT THE PROJECT Porali River Basin The survey data reveals that 100% awareness about the project was reported in the Gundacha and Jamot branches while 50% and 80% awareness was reported on Nurg and Hingri weris respectively. Nari River Basin During baseline survey, it was known that 100% of the communities were aware about the proposed Nari Gorge and Yatabad sub-projects. Page xvi Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) COMMUNITY PRIORITY NEEDS Porali River Basin During public consultation and baseline survey in the project area, the needs of the communities were assessed. The baseline reveals that pure drinking water and road are the top priority of the people, education is the second prioritized need, road is third need, electricity is forth and health facilities are at the least concern in the project area. Nari River Basin During public consultation and baseline survey on Nari Gorge sub-project, the needs of the communities were assessed. The baseline reveals that sewerage system is the top priority of the 96.4% and Natural gas is the second priority of only Marghzani village. The needs of the communities on Yatabad sub-project were pure drinking water as top priority of the 96.06% and roads were the second priority of the people. GRIEVANCE REDRESSAL Mechanism (GRM) The grievance redress system has been developed. It is designed taking into consideration the World Bank requirements, local laws and tribal traditions.. COMMUNICATION STRATEGY A guideline for the communication strategy has been prepared and to be fully prepared and implemented by the Contractor over the project. FARMER ORGANIZATIONS (FOs) There is an existing umbrella FO established 65-70 years back on the Porali River perennial flow from Gundacha to Bara bagh which is dully registered with the Revenue Department. The FO is headed by Tehsildar Bela and all the meeting minutes are officially documented with the Revenue Department. In addition, as experienced on World Bank funded Balochistan Minor Irrigation & Agriculture Project (BMIAD) in 1985-1990, Balochistan Community Irrigation & Agriculture Project (BCIAP) 1992-2002 and Balochistan Small Scale irrigation Project 2009-2015, the scheme based Farmer Organizations (FOs) establishment is proposed. The FOs will be dully registered under the Balochistan Irrigation and Drainage Authority Act (BIDA) 1997 and Community Irrigation Farmer Organization (CIFO) regulations, 2000. These FOs will participate in the design, implementation and O&M of the project. OPERATION & MAINTENANCE (O&M) The existing O&M activities on Jamot and Gundacha branches are conducted by the farmers. After completion of the proposed Sub-project capacity building of the farmers in O&M is proposed. SOCIAL IMPACTS& MANAGEMENT Impacts The major impacts associated and anticipated with the proposed sub-project’s implementation are land needs, cutting/uprooting of trees, health and safety of the workers and communities, possible disruption of water supply to the command area. The long term positive impacts of the proposed sub-projects are reduction of flood risk and damages, irrigation supply to the existing and additional command areas. During construction period, the sub-project will create employment opportunities for the locals. Land may be acquired to complete the proposed works. Page xvii Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Mitigation Measures The project investments will have footprint on the ground. Land will be required for the construction or rehabilitation. The project has developed a resettlement policy framework to guide future land acquisition and compensation matters in its investment schemes in line with relevant government and World Bank policies. At the same time, the project has also carried out its resettlement planning for Year One schemes that have completed engineering designs. A Social Impact Assessment And Mitigation Plan has been developed to address such impacts for these schemes. The specific mitigation measures against tree cutting are devised to be replantation by the Contractor during construction period. The contractors will determine the final alignment of the canals. The Contractor will make efforts to avoid trees cutting. Before commencement of the physical works, the Contractor will mark those trees and prepare tree inventory of those trees which are unavoidable during joint walk through survey with the PMU and PIC. At the implementation phase, the cut down trees shall be handed over to the farmers who are owner of the trees. As desired and agreed with the communities during the consultation and planning process, the cut down trees will be handed over the owners and new trees will be planted by the contractors and also handed over o the owners. The Contractor’s camp shall be at least 500m away from the settlement to avoid disturbance of the communities. In addition, the Contractor will follow the World Bank Environment, Health and Safety (EHS) guideline for the safety of his labor and communities. The communities are willing to donate the land voluntarily to the project where most of the schemes are actually owned and operated by the communities themselves. Principles and clear procedures are laid out and documented in this plan to ensure transparency and voluntary natureof the land contributions. In case where the proposed works are passing into government land, the PMU will officially correspond with the concerned department. In addition, a Resettlement Policy Framework (RPF)in line with the World Bank OP 4:12 and Land Acquisition Act, 1894 for the project and shall be implemented by the PMU.A Memorandum of Understanding (MoU) has also been prepared to be signed between PMU and land owner before physical works’ commencement. Page xviii Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 1 INTRODUCTION 1.1 Project Background Water situation in Balochistan is acute as a whole. Balochistan often faces severe drought conditions and water availability is drastically reduced during extended droughts which lead to high marginality in income and livelihood means. The storage facilities are inadequate for both surface and ground water and the poor conditions of canal and water structures require urgent rehabilitation and regular maintenance. The lack of adequate water storage capacities, flood retention areas as well as flood protection embankments led to the experience of high damages. Urgent efforts and investments are required for rehabilitation of its water infrastructure, water conservation and retention of flood water. The Government of Balochistan now has proposed to adopt an Integrated Water Resources Management approach to address the above challenges. The government has requested financial support from the World Bank for the Balochistan Integrated Water Resources Management and Development Project. The project consists of the following four components.  Component-A supports setting up the IWRM Process which will include community mobilization and training for the formation of Farmers Organizations.  Component-B includes implementation of No-Regret Sub-projects such as irrigation, potable water supply, farm tracks and basic services Sub-projects.  Component-C includes activities like (i) improve watershed management, rainwater harvesting and water storage schemes, rangeland and forestry management; (ii) rehabilitate and construct irrigation schemes (large, small and minor); (iii) strengthen flood and drought management; (iv)develop micro-hydropower and other water productivity schemes; (v) improve agriculture technologies; and (vi) improve basic services.  Component-D is on program Management, Monitoring & Evaluation (M&E), and Studies Balochistan Small Scale Irrigation Project is a World Bank funded project which started in October 2008. It is aimed to support the Government of Balochistan to improve the management of scarce water resources in the Pishin Lora Basin. This project’s outcomes initially included feasibility studies for small scale irrigation schemes in 03 other river basins of Balochistan: Porali River; Nari River; and Rakhshan River. The feasibility studies were meant to be limited to isolated small scale irrigation schemes. Later on, in consultation with various subject experts, the World Bank revised the scope. Instead of localized development schemes, the revised scope requires an “Integrated River Basin Management” approach. This new scope now covers two river basins (rather than three); namely Porali and Nari. 1.2 Aims and Objectives The Terms of Reference (TOR) for this assignment are attached as Annexure A. The main aims and objectives of this study were:  to establish as socio-economic baseline of the project for social impacts assessment and future monitoring and evaluation;  to assess the anticipated social impacts of the project; and  If required; to develop a Resettlement Action Plan (RAP). This SIAMP is for the entire project, but the safeguard follows a two-prong approach, i.e. social impact screening and mitigation planning for Batch One schemesand a resettlement policy framework is developed to guide social planning for the rest of the schemes in years to come. 1|Page Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 1.3 Scope The scope of the study as per TORs includes but not limited to:  Developing a socioeconomic profile of the population of the selected schemes.  Carrying out inventory survey of project impacts including impacts on land and other properties legally owned or owned without title. These need to be quantified and documented.  Carrying out census survey of the impacted population, including owners, tenants and those without title. These need to be by household and number of people.  Designing necessary mitigation measures, including compensation in cash, in kind orfree as possible “donation” practice.Formulating entitlement provisions under the project if resettlement and compensation measures are confirmed as necessary.  In case of suggestions for land owner “donation”, formulate principles, procedure, necessary documentation requirements.  Development of implementation arrangements including budgeting, institutions and monitoring etc.  Designing a grievance redress mechanism.  Preparing a resettlement action plan in case of relocation. 1.4 Review of Previous Studies Preparing this SIAMP, the design and social assessment report along with the tender drawings prepared for the priority sub-projects under Year 1 were carefully reviewed. 1.5 SIAMP Methodology Both qualitative and quantitative approaches were used for the preparation of SIAMP. The study was based on relevant primary and secondary sources of data i.e. the social assessments, design reports, engineering drawings of the Sub-projects and official documents published by the government of Balochistan, Pakistan. 1.5.1 Tools of Data Collection Focus group discussions and consultative meetings were conducted at village level and with different departments and organizations to gather additional relevant primary data. The following questionnaires were designed (given as Annexure B) and applied in the project area;  A village profile and socio-economic questionnaires were designed and administrated to the target population in the project command area. The socio-economic questionnaire is divided into 14 sections, including basic information of the household, awareness regarding the project, demographic details, available facilities in the house, fuel consumption, social issues, livestock, anticipated losses due to project, housing, land holding and land use by the household, commercial assets, and livelihood and income of the respondent.  For resettlement survey, the questionnaires for Inventory of affected commercial structures, inventory for affected residential structures and inventory of public and community structures were prepared.  In addition, the census survey of the water & land shareholders was also carried out. 1.5.2 Data Collection For the collection of socio-economic baseline primary data, a sample survey of 25% was conducted within the command area of each branch and Weir. Primary data has been 2|Page Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) collected through interviews from individuals and groups carried out by the male sociologists. A small number of villages being not the legally entitled for land and water share in the scheme area were also visited for collection of household and population data to create a more authentic picture with respect to the project area. 1.6 Study Team The assessment was carried out and the report prepared by a multidisciplinary team of qualified environmental and social scientists. The key members of the team are listed below in Tables 1.1 and 1.2; Table 1.1: The SIAMP Team for Porali River Basin Sr. No. Name of Expert Designation 1 Mr. S.M Kakar SIAMP Expert 2 Mr.Gulzar Khan Sociologist 3 Mr.Yasir Habi Sociologist 4 Mr.Ghulam Rasool Siapad Community Organizer Table 1.2: The SIAMP Team for Nari River Basin Sr.No. Name of Expert Designation 1 Mr. Niamatullah SIAMP Expert 2 Mr. Abdul Shakoor Khan Sociologist 3 Mr. Saranjam Khan Sociologist 4 Mr. Aurangzaib Community Organizer During reconnaissance visit, proposed sites were jointly visited along with the engineering team of TECHNO-Consult International who designed the scheme and the names are given in the following Table 1.3 and 1.4. Table 1.3: Engineering Team Sr. No. Name of Expert Designation 1 Mr. Muhammad Ali Irrigation Engineer 2 Mr.Nizam Surveyor Table 1.4: Engineering Team Sr. No. Name of Expert Designation 1 Mr. Anwaar-u-Haq Irrigation Engineer 2 Mr.Waqar Surveyor 1.7 Assessment & Reporting 1.7.1 Impact Assessment Process This study has been conducted using standard SIAMP methodologies, the assessment process consists of a number of elements based on previous studies and incorporation of additional information gathered during site visits, discussions with officials of government departments and meetings with groups from the communities living in as well as adjacent to the project area. 1.7.2 Use of Engineering Drawings The engineering drawings prepared for the sub-projects by Feasibity Consultants have been used to assess the impacts of the project on the existing settlements and land use. 3|Page Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 1.7.3 Public Consultation Public consultation is one of the key regulatory tools employed to improve transparency, efficiency and effectiveness of regulations for a development project. It involves actively seeking the opinions of those interested or affected by a project. It is a two-way flow of information, which may occur at any stage of development from project identification through planning, design, construction and operation. It may be a process or a continuing dialogue between project implementation authority and the affectees. Consultation is increasingly concerned with the objective of gathering information and finds the acceptable solution. The consultation process presented in this SIAMP was carried out in accordance with the national regulatory requirements and the WB Operational Policies on stakeholder consultation. The purpose of consultation was to disseminate project information among the project stakeholders and obtain their feedback regarding local knowledge of baseline, mitigation measures, perception of the community regarding impact significance and their views on project interventions. 1.7.4 Objectives Participation mechanisms facilitate the consultative process and include: information sharing and dissemination; disclosure; and participation of all stakeholders in the project related activities so that their views and concerns shall be addressed properly and ensure them that they are actual beneficiaries of the project. It is of basic importance to involve representatives of local communities’ right from the start. The institutional arrangements should also be in place for continuous consultation throughout the process of planning to implementation of the project. 1.8 Area of Influence 1.8.1 Corridor of Impact (CoI) The Corridor of Impact (CoI) is considered the area to be commanded by the project in which there could be a direct impact when the irrigation system is improved and modernized. Therefore; the socio-economic and other SIAMP relevant surveys are conducted in this area. 1.8.2 Right of Way (RoW) To carry out the resettlement surveys, the Right of Way (RoW) has been considered as the area along the existing earthen canals and weirs where the proposed engineering works are to be carried out. Following the General Drawings of Feasiility Study for Gundacha- Nurg/Hingriand Nimmi scheme), the RoW for the canals is decided 8 meters. In the case of weirs; there are existing weirs and the project is planning to rehabilitate only the existing structures. The RoW of Yatabad and Nari Gorge sub-projects were54m for the main canal of Yat Abad and branch canals are 32m. The RoW of Nari Gorge sub-project is 15ft. 1.8.3 Structure of SIAMP This report is presenting the existing irrigation practices, villages’ profile, socio-economic baseline, land acquisition & resettlement situation and impacts including their mitigation measures for the selected schemes/su-projects under Year 1. The description for Porali River Basin area is given inPart-A, Nari River Basin area inPart-Bwhereas; social impacts management planning for BIWRMDP is in Part-C. The Annexures are given at the end of the Plan. 4|Page Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 2 ROJECT DESCRIPTION 2.1 Introduction This chapter describes the Sub-project, based on the detailed design and tender documents prepared in 2013-14, explaining the nature of engineering interventions, how the Sub-project will be implemented and operated. For fulfilling the requirement of the SIAMP, the description of the Sub-project has been outlined to identify the social impacts of the proposed Sub-projects interventions in Nari and Porali River Basins and if any the likely significant impacts are identified, the mitigation measures are recommended. 2.2 Sub-project Location & Description 2.2.1 GundachaSub-project The Gundacha-Nurg/Hingri Sub-project is located in Tehsil Bela and District Lasbela on the Porali River and is an integrated project of two existing earthen canals i.e. Gundacha & Jamot and two existing Weir structures i.e Hingri and Nurg. The Gundacha area lies along the middle reach of the Porali River. The river flowing in this reach covers a Culturable Command Area (CCA) of around 6000 acres. The main issue at Gundacha is the uncontrolled flow entering the Command area. The Gundacha–Nurg Hingri Irrigation Scheme (GNHIS) package proposes a reliable diversion system at the Gundacha stretch of Porali River. Nurg Hingri area lies at about 5 km downstream of the Gundacha village. The existing Nurg and Hingri Weirs command the area through flood flows and cover about 8,000 and 12,000 acres respectively. The major issue in this area is the open crest high volume discharge in the downstream earthen channels. This package proposes an improvement of existing Nurg- Hingri diversion Structures and conveyance channels. The key plan of Gundacha Sub-project is given as Figure 2.1. The GNHIS Package will result in overall socio-economic up-gradation of the locals and will considerably benefit the farming communities as well. The branch wise details are given in the following sections: A. Gundacha Branch A 410 m wide ungated overflow weir has been proposed at Gundacha. The primary purpose of this weir is to raise the water level to ensure continuousirrigation water supply to the command area. The weir structure will also prevent the incoming sediments to enter into the main canal. An under sluice is to be provided on the right flank of the weir with 3 openings each 2.2 m wide. The head regulator for has been designed as an open intake with concrete box section. Guide bunds will be provided for protecting the command area from flooding.Gundacha branch is a century old community operated irrigation system located in Union Council Kannar, Tehsil Bela and District Lasbela. The branchis offtaking form the Poorali River and commanding the land on the right bank of the river through an earthen canal of 12km. B. Jamot Branch Jamot branch is also of the same nature irrigation system and situated in the same area. The branch is offtaking form the Poorali River and running parallel to the Gundacha Branch commanding the land on the right bank of the river through an earthen canal of 12km. C. Hingri & Nurg Weirs The existing Nurg Hingri overflow weir is a 295 m wide concrete structure with two secondary weirs of 66 m and 44 m wide water way respectively. The site survey of the Weir location indicated absence of maintenance and upkeep during past years. Based on the damage caused at the downstream of the weir, an up gradation of the weir and related structures has 5|Page Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) been proposed. The excessive discharge will be controlled by providing a breast wall on the Nurg and Hingri Weirs to limit the entering peak floods. An under sluice will be provided to keep the tendency of river flow towards the off take. Reconstruction and strengthening of the embankment bunds and spot repairs for minor damages will also be carried out. Both Weir structures are constructed in the past and irrigating the command through earthen canals aligning within the river bed. Due to its alignment in the river bed, the canals are frequently damaged after each flash flood. 2.2.2 NimmiSub-project The proposed weir site is located at main Porali River upstream of the proposed Gundacha sub-proejct, at a distance of 3.5 km from RCD Highway in the north-west direction. The site is only accessible by unpaved Track. The co-ordinates of the proposed weir are26°30'33.02" N and 66°22'43.45" E and the weir axis is border between Lasbela and Khuzdar districts. The location of weir site is given in Figure2.2while the key plan is given in the Figure 2.3. The project includes construction of a diversion weir, together with appurtenant structures such as head regulator, under sluice, cross regulator and siphons, 24,000 meter concrete main canal and about 5,100 m of branch canals.The overflow weir is an ungated concrete structure with its crest at EL 268.5 m. Length of the weir is 280 m. The crest of the overflow weir is USBR standard sharp crested shape with sloping upstream face having and also sloping face on the downstream. The sloping portion of the weir crest is joined on with the stilling basin floor i.e. at EL 266.5 m by means of straight sloping portion having slope of 1V:1H and a circular curve. The floor level onupstream of the weir is kept at EL 267.0 m while the crest level of weir is 268.5 m. The weir is designed for a flood discharge of 3,500 cumecs. The under sluices in the weir structure are provided to flush out sediment deposit from upstream of head regulator, and discharge flood water. The head regulator is designed as a gated sluice with breast wall. It consists of two (2) openings each of size 1 m wide x 0.5 m high (clear). Vertical lift type gates will be provided to regulate the flow. Sill of regulator is provided at EL.267.5 m which is 0.50 m above the upstream floor level set at EL.267.0 m and 0.50 m above the crest of under sluice to prevent sediment from entering the main canal. The head regulator is designed for a maximum discharge of 1 cumecs. The irrigation system has been designed to cater for command area of 1,457 ha (3,600 acres). The length of main canal is about 24,000 m, while that of branch canal is about 5,100 m and following structures. Table 2.1: Proposed Structures on Nimmi Scheme Aqueduct Large 11 Aqueduct Small 15 Glasic Falls Structure 15 Field Offtake Structures 30 Drainage Culvert Large 17 Drainage Culvert Small 49 Road Culvert Small 27 Road Culvert RCD Highway 5 2.2.3 Yatabad Sub-project The Yatabadis located in District Loralai Tehsil Duki and is a new proposed irrigation project consists of one main and 10 branch canals and one Weir structure. The details are given in the following sections and the location of the sub-project is shown in Figure:2.4. A. Main Canal 6|Page Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Main canal of Yatabad is a new irrigation system located in Tehsil Duki and District Loralai. The canals are proposed to divert form the Anambar River to command the land on the right bank of the river. B. Branch Canals Along with main canal, 10 branch canals are also proposed to command the land situated on different locations. The total lengths of main and Branch canals are shown in Table 2.2. Table 2.2: Detail of Main and Branch Canals Branch wise Detail of Yatabad Integrated Irrigation Scheme Name of Branch Canal No. of Farmers Length in Km Area in Acres Main Canal 74 22 250.2 Branch Canal No. – 1 7 1.4 7.59 Branch Canal No. – 2 6 3.2 19.28 Branch Canal No. – 3 27 4.93 35.25 Branch Canal No. – 4 0 7.7 58.13 Branch Canal No. – 5 19 5.95 41.22 Branch Canal No. – 6 19 9.08 71.8 Branch Canal No. – 7 5 6.3 43.65 Branch Canal No. – 8 4 4.5 28.8 Branch Canal No. – 9 8 3.25 19.58 Branch Canal No. – 10 9 1.74 10.48 Total 104 48.05 335.78 Grand Total 178 70.05 585.98 2.2.4 The Nari Gorge Integrated Sub-project The area of the Sub-project is located in the Chakar-Lehri sub-basin. It starts near the boundary of Bolan-Mushkaf sub-basin and including Luni, Dehpal, Kurak, Marghzani Kalan, Sibi and Kahajjak. The boundaries end near Kot Barozai village. The area lies between latitudes 29°28' to 29° 40' N and longitudes 67° 48' to 68° 02' E. It is connected with Quetta and Jacobabad with the metaled roads. The geographical area of the Sub-project is about 9470 km2. The project location is shown in the Figure 2.5. 2.3 Administrative Setup of Porali River Basin TheSub-projects of Porali River Basin are falling in the administrative setup of Lasbela District. District administration is headed by the Deputy Commissioner (DC) who is assisted by heads of other departments. The DC is responsible for the coordination of functions of all the departments in the district. The main district departments include: administration; judiciary; police; education; health; communication and works; agriculture; forestry; irrigation; and livestock and fisheries. The head of each district department is responsible for the performance of his department and is generally designated as the Deputy Director or Executive District Officer. On the judicial side, the Deputy Director is assisted by an Additional District Magistrate and on the revenue side by an Assistant Deputy Commissioner. 2.4 Administrative Setupof Nari River Basin The Sub-projects of Nari River Basin are falling in the administrative setup of Loralai and Sibi Districts and the administrative setup is similar to the other districts of Baluchistan. District administration is headed by the Deputy Commissioner (DC) who is assisted by heads of other departments. The DC is responsible for the coordination of functions of all the departments in 7|Page Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) the district. The main district departments include: administration; judiciary; police; education; health; communication and works; agriculture; forestry; irrigation; and livestock and fisheries. The head of each district department is responsible for the performance of his department and is generally designated as the Deputy Director or Executive District Officer. On the judicial side, the Deputy Director is assisted by an Additional District Magistrate and on the revenue side by an Assistant Deputy Commissioner. 8|Page Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Figure 2.1: Key Plan of Gundacha-Nurg Hingri Sub-project 9|Page Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Figure 2.2: Nimmi Sub-project Location Map 10 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Figure 2.3: Key Plan of Nimmi Sub-project 11 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Figure 2.4: Location of Yatabad Sub-project 12 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Figure 2.5: Location map of Nari Gorge Integrated Sub-project 13 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) PART ONE PORALI RIVER BASIN AREA SUB-PROJECTS 14 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 3 EXISTING IRRIGATION SYSTEM IN PORALI RIVER BASIN 3.1 Mode of Irrigation 3.1.1 GundachaSub-project The Gundacaha and Jamot branches are performing dual functions of perennial and flood irrigation system. The Porali River is perennial and the farmers are utilizing the perennial flow as well as the flood water in monsoon season. The mode of irrigation on Hingri and Nurg weirs are only for flood water utilization. 3.1.2 Nimmi Sub-project There are two types of water one is the Porali River perennial and flood water and the other is Kannar Kareze. This time the farmers are dependent on perennial flow of the river and the Kareze flow is utilized when the perennial flow of the river decreases in summer months or completely dried up while due to high flood intensity, the farmers are not able (except a few) to divert the flood water of the Porali River. 3.2 Water Rights There is a complicated water rights and distribution system on Gundacha sub-project i.e. the principal water distribution from Gundacha to Bara Bagh, water distribution on Gundacha and Jamot branches and special water share allocated for the community reservoir.Similarly the water distribution over perennial flow of the Porali River as well as Kannar Kareze located upstream of existing breach able bunds of Gundacha and Jamot.These all aspects are covered in the following sections. 3.2.1 Water Rights & Distribution on Porali River-Gundacha to Bara Bagh The 2water rights on the perennial water which is commonly known as “Aab-E-Siah” is well defined at the branch level among the beneficiaries in the project area. The branch as well as village level distribution is expressed in fixed time share of original cycle of 30 days. There is no fixed distribution of flood water neither on village level nor on branch level. The water distribution on branch as well as village level is summarized in the following Table3.1; Table 3.1: Main Water Distribution through Porali River Water Share Sr. No. Name of Branch (in Days where 1 Day=24 Covered in the Project Hours) 1 Gundacha Branch 7 Yes 2 Jamot Branch 2 Yes 3 Peero Goth 3 No 4 Bhit 2 No 5 Faizo 2 No 6 Mazar 2 No 7 Wisre 2 No 8 Bara Bagh 10 No Total 30 3.2.2 Water Distribution on Gundacha Branch The land in the command area of the proposed project is distributed among the beneficiaries and the land is almost 80% owner operated while 20% is tenants operated.The water rights 2 This water distribution is on Porali River from Gundacha to Bara Bagh, situated close to the Bela city. 15 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) on Gundacha branch is within village level are on the basis of head to tail principle. The overall water cycle on Gundacha branch is 7 days. The details are summarized in the following Table 3.2. Table 3.2: Water Distribution through Gundacha Branch Water Share Sr. No. Name of Village (in Days where 1 Day=24 Hours) 1 Jano Goth 2 Abdullah Goth 3 Faqir Goth 2 4 Mitha Goth 5 Rodini Goth 6 Faqir Goth 7 Siapad Goth 1 8 Warwani Goth 9 Wadera Muhammad Omar Goth 1 10 Faizwani Goth 11 Habib Goth 12 Kadwani Goth 3 13 Mula Ishaq Goth 14 Yaqoob Goth 15 Muhammad Hassan Goth Total 7 *in the household survey, some of the households are integrated in other villages due to their conventional water distribution pattern & location of agriculture land. 3.3 Special Water Rights on Gundacha Branch At RD:7+290 on the left side of the Gundacha branch, the communities have constructed a reservoir approximately50 years back for storage of water for livestock, drinking and other domestic use. Therefore; a special water share has been allocated from the overall water cycle of the Gundacha branch. As the reservoir get emptied or near to empty, the canal water is diverted and released into the reservoir. This time of reservoir filling is deducted from the overall water cycle. 3.3.1 Role of District Administration in Water Distribution by Gundacha Branch As discussed in the following chapters, the area had an umbrella Farmer Organization (FO) which is formally registered with the Revenue Department and is headed by Tehsildar Lasbela. The water is distributed under the supervision of district levies of Lasbela. The Levis is overseeing water theft and conflict on water distribution of the Jamot and Gundacha canals. 3.3.2 Water Distribution on Jamot Branch Water distribution on Jamot branch is head to tail reach and the overall water cycle is of 2 days. 3.3.3 Water Rights on Nimmi Sub-project In case of Nimmisub-project, due to high flood intensity, the flood water cannot be diverted by the farmers and only the perennial water of the river is used for irrigation. The earthen conveyance canal is aligned up in the river bed and prone to frequent flood damage. There are two points under the command of the proposed Nimmi sub-project where perennial flow of the river is diverted for irrigation through earthen conveyances system. One is at the point where the Weir structure is proposed and the water is diverted to irrigate the land of Jani Goth and Nimmi Bent Goth. The other point is downstream of the proposed Weir structure where 16 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) the farmers of 3Kishari Goth and Langra Goth have diverted the perennial flow of the river to irrigate their land situated on the left bank of Porali River. 3.3.4 Water Rights &Distribution on Kannar Kareze There are downstream water users of the perennial flow of Porali River as well as Kannar Kareze flow. The Kannar Kareze is located downstream of the proposed Weir. The downstream users are farmers of Gundacha branch, Jamot branch, Bhit branch, Wisre, Faizo, Mizar, Sardar Mehrullah and Bara Bagh. The major water distribution of Nimmi and other downstream users are on both sources and is based on flow division in which 1/4th (0.25%) of the water is allocated for the Nimmi area and remaining flow is released for the downstream users. Some of the villages like Kannar Goth,Soneri Goth, Jumman Bhent and Silli Bhit located on the left bank of the Porali River have also water share In 1/4th share of water allocated for Nimmi villages. These villages are not in the command of the proposed Nimmi Sub-project. Within farmers community of Nimmi scheme, the water rights on the perennial water of the River which is commonly known as “Aab-E-Siah” is on head to tail principle. There is no fixed distribution of flood water in this scheme area. As reported by the community, over Nimmi scheme, the Sher Muhammad Goth, Jani Goth, Sour Dir and Kundi have no water share in Kannar Kareze because their land is locatedupstream of the source. Only the Langra and Kishari Goths have the entitlement of water share in the Kannar Kareze. 3.4 Land Quartile Distribution 3.4.1 Land Quartile on GundachaSub-project All the lands on Gundacha and Jamot Branches are registered under the name of Gundacha Jagir, Tahsil Bela district Lasblea. While the land record of Hingri and Nurg weirs are registered in the name of Dhora Hingri, Onra Kangar and Chibb in Tehsil Bela district Lasbela.The record was last updated in 1964. Survey reveals that 63.29% of largest land shareholding amongst beneficiary households own (upper quartile) and lower quartile own 5.63% of the land in the project area. Quartile wise land distribution is given in Table 3.3. Table 3.3: Detail of land distribution in Gundacha Sub-project Area 25% of the land lords owning % of Land in Gundacha Sub-project Lower quartile 5.63% Second quartile 10.96% Third quartile 20.0% Upper quartile 63.29% 3.4.2 Land Quartile on Nimmi Sub-project All the land on Nimmi Sub-project is registered under the name of Nimmi, Tahsil Bela district Lasblea. The record was last updated in 1964. Survey reveals that 54.23% of largest land shareholding amongst beneficiary households own (upper quartile) and lower quartile own 9.26% of the land in the project area. Quartile wise land distribution is given in Table 3.4. Table 3.4: Detail of land distribution in Nimmi Sub-project Area 25% of the land lords owning % of Land in Nimmi Sub-project Lower quartile 9.26% Second quartile 14.53% 3 For Kishari Goth, the irrigation supply under the proposed project will be in addition to the existing river perennial flow utilization. 17 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Third quartile 21.96% Upper quartile 54.23% Note: In this quartile distribution, the Habib & Ibrahim Siapad Goths are incorporated as their land falling in the command of the Sub-project is communal land and as yet it has not been distributed on individual farmer level. 3.5 Water & Land Rights in Nimmi Sub-project Area There are two types of land and water rights on the proposed Nimmi Sub-project.  One is the farmers of Sher Muhammad Goth, Jani, Nimmi Bent, Sour Dir, Kundi and Kishari villages who are settled along the bank of Porali River and practicing irrigation for many years through diverting the perennial flow as well as flood water (on need basis) of the Porali River. This irrigation is only for the lands which is along the bank or Porali River and is on low altitude. The perennial flow of the river is conveyed to their agriculture land through earthen irrigation canals. The land is owned by the communities settled in the aforementioned villages. A separate inventory of the entitled communities is prepared and given as Annexure-D.  The other is the additional areas which are considered to be commanded under the proposed Sub-project which is owned by the same villages (except Jani & Sher Muhammad Goth) including the villages Hbib and Ibrahim Siapad. This portion of land considered in the proposal is new development and due to location on high altitude, the land was not irrigated in the past with the perennial flow. The villagers of Ibrahim Siapad Goth are also beneficiaries another proposed Gundahcha Sub-project. Following the tender drawings of the proposed Sub-project, approximately after RD:3+000, the alignment of the propose main and branch (Kundi & Kishari) irrigation canals are trespassing into barren land upstream of Kundi village, crossing the RCD Quetta-Karachi highway and further aligning in a zigzag manner along the RCD highway on the elevated terraces to the end. In the design report, after RD: 5, twenty (20) outlets are provided on various locations along the length of canal to irrigate the currently uncultivated land. As reported during consultation with the communities, the proposed additional areas to be irrigated by this project have no water allocation and rights in the existing community operated systems. As the water level fluctuated throughout the year, therefore; the downstream users may not be willing to allow the water for additional areas. There are two perceptions on community and government level. Within community some of the people are of the view that the land from where the proposed canal is trespassing or the land perceived to be irrigated is the ownership of the villagers and they have distributed the land in accordance to the legally entitled size of land and other members of the community are of the view that the land is government property. On the Government level, the SIAMP team conducted consultation with the Revenue Department concerned Qanoongo and Patwaries based at Lasbele, they were of the view that the land located along the Porali River is the property of the local people while the land situated on the elevation of the River and on the right side of RCD highway (moving from Quetta-Karachi) is government property. Water & Land Shareholders 3.5.1 No. of Water& Land Shareholders in Gundacha Sub-project Area Some of the resident families have no water rights due to number of reasons. First; the families without water permanent rights consist of those families who settled in the area after water sharewas distributed. Secondly are the families who are residing in the area as nomads for grazing their herds and working as seasonal tenants. The number of water and land shareholder on Gundacha, Jamot,Hingri and Nurg are illustrated in the Table 3.1 and Annexure-C. All the land on Nimmi Sub-project is registered under the name of Nimmi, Tahsil Bela district Lasbela. The record was last updated in 1964. 18 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 3.5.2 No. of Water & Land Shareholders in Nimmi Sub-project Area There are two types of water and land shareholders on the Nimmi Sub-projectwhich are described as follows: A. No. of Water & Land Shareholder under Existing Irrigation System As discussed in section 2.4, the water and land shareholders under the existing irrigation system are presented in the following Table 3.5; Table 3.5: No. of Water & Land Shareholders on Existing Irrigation System Sr. No. Name of Village No. of Water & Land Location of Agriculture Land Shareholders 1 Sher Muhammad 05 Land is on both sides of River Goth close to the proposed Weir Structure. 2 Jani Goth 8 Right Bank 3 Nimmi Bhent 11 Right Bank 4 Kundi 12 Right Bank 5 Sour Dir 18 Right Bank 6 Langra Goth 28 Right Bank 7 Kishari Goth 46 Right Bank Total 123 B. No. of Land Shareholder for the Proposed Irrigation System The water and land shareholders for the proposed irrigation system after RD:3+000 is presented in the following Table 3.6. Table 3.6: No. of Water & Land Shareholders on Proposed Irrigation System Sr. Name of Village No of Water & Land Type of Land use No. Shareholders Cultivated Barren 1 Nimmi Bhent 11 No Yes 2 Kundi 12 No Yes 3 Sour Dir 18 No Yes 4 Langra Goth 28 No Yes 5 Kishari Goth 46 No Yes 6 Ibrahim Siapad 31 No Yes Goth 7 Habib Goth 87 No Yes Total 233 As shown in Table 3.6, this portion of land to be irrigated under the proposed new irrigation system is barren and on community level, there is no allocated water for irrigating the land.The aforementionednumber of water and land shareholder on Nimmi Sub-project is illustrated in the Table 4.2 and Annexure-D. 3.6 Communal Land In case of Gundacha Sub-project, all the cultivated land is distributed among the individual families and the land titles have been registered under Mouza Gundacha, Tehsil Bela and District Lasbela with the Revenue Department Government of Balochistan. As surveyed, in the original command of Gundhach, there is no communal land. Sam situation can be observed on Jamot branch. While on Hingri and Nurg, there is barren land on the left bank of the river, the ownership is confirmed to the respondents.While in the case of Nimmi Sub- project, only the strip of land located along the banks of Porali River is distributed among the farmers. As discussed in section 2.4 and Figure: 2.1, the remaining land after RD:3+000 of the proposed irrigation canal is considered communal on the community level while on 19 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Government level, it is considered government property. During public consultation with the villagers of Ibrahim Siapad and Habib Goth, they have reported that the existing land located at the tail of the proposed irrigation canal is communal property provided by Jam Yousuf for development. In addition, on Kishari branch, there is also some communal land lcated on the left side of RCD highway (moving from Quetta-Karachi). The famers of Kishari village reported that the communal land will be distributed on the basis of existing land share among the villagers. The total area of the communal land is not confirmed to the community and they have reported that 1/3rd share out of the total land goes to Habit Goth and the remaining will be owned by the villagers of Ibrahim Siapad Goth. When the scheme is developed, the villagers will distribute the communal land evenly on household basis. 3.7 Tenancy Tenancy is not the dominant form of land tenure in the project area. Approximately; 80% of the land is owner operated and 20% of the land is tenant operated. Tenancy is practiced on that tract of land where the land owner had a large share of land or the owner is residing outside the district. 3.8 Cropping Pattern The lands in project area are fertile and farmers grow sugarcane, cotton, sorghum and vegetables during the Kharif season (April to November) and wheat, pulses, lentils and vegetables during Rabi season (April to October). Kharif crops are often flooded by the high floods in the Porali River and Rabi crops are usually sown on the residual flood moisture. Sugarcane is a cash crop and is the most commonly grown crop in the project area. The most commonly grown crops are wheat, rice, sugarcane and fodder for livestock. 3.9 Operation & Maintenance The irrigation system of Gundacah and Jamot branches are developed and operated by the farmers themselves. While the Hingri and Nurg Weirs were developed by the Government of Balochistan. While the existing irrigation system of Nimmi scheme is developed and operated by the farmers themselves. The O&M is different as compared to the Gundacha scheme. As farmers of Sher Muhammad Goth, Jani and Nimmi Bhent, Sour Dir, Langra and Kishari Goths have developed separate channels offtaking from the Porali River and accordingly each village or group of villages are responsible to maintain the system. The existing system is prone to flood damage and therefore; major maintenance activities are construction of breachable bund and re-development or rehabilitation of irrigation channel after each flash flood. 3.9.1 Maintenance of Diversion Structure & Conveyance System The routine maintenance on Gundacha and Jamot branches are of diversion weirs and conveyance system is normally undertaken by the water shareholders themselves. There are two reasons of the diversion breach; one is; as the diversion weirs are earthen made and frequently prone to breach after each flash flood; second is; as the perennial water of the Porali River is also use downstream up to Bara Bagh; therefore; after completion of the water share on branch base; the earthen diversion bund is ultimately breached to release the water for downstream water users. Therefore; the breach and reconstruction of the diversion bund requires major maintenance throughout the year. This maintenance is carried out by the watershareholders on each branch and contribution of individual water share holder is on the basis of land size owned and irrigated under the system. The existing irrigation system of Nimmi scheme is developed and operated by the farmers themselves. The O&M is different as compared to the Gundacha scheme. As farmers of Sher Muhammad Goth, Jani and Nimmi Bhent, Sour Dir, Langra and Kishari Goths have developed separate channels offtaking from the Porali River and accordingly each village or group of 20 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) villages are responsible to maintain the system. The existing system is prone to flood damage and therefore; major maintenance activities are construction of breachable bund and re- development or rehabilitation of irrigation channel after each flash flood. 3.9.2 After Project O&M The O&M of Perennial and Spate irrigation schemes have to be undertaken by the FOs. Neither Porali River Basin Integrated Water Resource Management Project nor the irrigation Department have the resources to take an active role in the daily management of the irrigation schemes once the construction works are completed. Following the handing over of the completed schemes to the farmers, at the end of the construction phase, the FOs of the irrigation schemes have to take over the responsibility for the O&M of the irrigation scheme. 3.9.3 O&M of Infrastructures and FO’s Responsibility The Perennial and Spate irrigation civil works developed under the investment Projects are often of substantial magnitude and costs. The construction costs surpass the investment capacity of farmers in Balochistan, whereas the O&M of high-investment infrastructure, even if well-built, will put a considerable responsibility on FOs. 3.9.4 Farmers’ Training on O&M To prepare FO’s members for the proper O&M of the irrigation infrastructure, the project may considers training and the direct involvement of FO members in the construction of the civil works to be the appropriate instruments to enhance relevant technical and management skills. This would result in capacitating the FOs in gaining experience in the construction phase and to take over in future O&M responsibility. This opportunity is unique in building capacity of FOs and no training in post-project scenario can help to build their capacity. 3.9.5 Purpose of farmers’ Training on O&M The main purpose of the FOs’ O&M Training is to build up the levels of awareness and skills which are necessary for the proper O&M of the irrigation infrastructure following the handing over of the scheme. This would involve:  Providing the FOs with practical O&M guidelines in a form which can be easily understood.  Providing training in planning, cost estimation and budgeting of maintenance activities; and  Providing training in the practical skills which are required for carrying out maintenance activities. 21 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 4 SOCIOECONOMIC BASELINE AND PROFILE OF THE SUB-PROJECTS IN PORALI RIVER BASIN 4.1 SOCIO-ECONOMIIC PROFILE 4.1.1 Background of District Lasbela Lasbela was separated from Kalat after granting district status on 30 June, 1954. The name originates from Las which means a plain, and Bela, the Jungle. Bela is also the name of an important town in the district. The district headquarter is in “Uthal” town. The district is located in the south of the Quetta City, the provincial capital of Balochistan, sharing its boundaries in the east with Sindh Province. Awaran and Gwadar Districts are on the west and Khuzdar District is in the north. Lasbela was a princely state until 1955 since 1742, and remained a princely state even during the British era in the SubContinent. The state occupied an area of 18,254 square kilometer (7,048 square miles) in the extreme south-east of the Balochistan Province with an extensive coastline on the Arabian Sea to the south. Lasbela shared its borders with princely states of Kalat and Makran to the north and west respectively. This district is mountainous in the east and has central alluvial lowland drained by the Porali and Kud Rivers, whereas in the west, there is a narrow coastal strip dotted with mangrove swamps. 4.1.2 Tribes & Ethnic Groups in the District The population of Lasbela presents many features of special interest to the ethnologist. The first historical reference to the ancient population of Lasbela and Makran was found in Arian, which further divides the population into two distinct classes. The people of the coast are known asIchthyophagoi or fish-eaters and population of the interior are called the Arabi, the Oreitai and the Gadrosia. Several other authors have described the strange race of the Ichthyophagoi, who are undoubtedly identifiable as the present fishermen of the coast. The principal tribes among the Lasis claim to be descendants of the Sumras and Sammas, who formerly resided in Sindh. It is quite clear from their tribal names that many of them are of Hindu origin. The term Lasi is a geographical name, which is applied to all the tribes other than Baloch, Med, Khoja and Hindus, who are settled in Lasbela. There are five principal Lasi tribes: Jamot, Roonjha, Sheikh, Angaria and Burraf. These are called the Panjraj or the five tribal confederacies. Under each Raj, there were a large number of heterogeneous groups. Some other tribes include the Gunjas, Sinars, Sangurs, Burfats, Chhuttas and Khojas. A large number of Hindus are also residing in Uthal, Bela and Hub. They all belong to the Arora caste. The Hindus are mostly of the orthodox school; however, they are not strict in the observance of their religious rites and have modified several of their ordinary daily customs. Among other tribes are the Babbar, Gadras, Langhas and Koris. 4.1.3 Religions in the District Religious Beliefs Majority of the people of the area are Sunni Muslims. They offer their prayers and fast in the month of Ramazan. Religious leaders (Mullahs) are amongst the influential in rural areas, however, their dominance diminishes in the urban areas. The main festivals are Eid-ul-Fitar and Eid-ul-Azha, which the Muslims celebrate with a lot of fervor and joy. The shrines of Mai Goudrani and Shah Bilawal are very famous in the area. People visit them with solemnity. A fair is held at Shah Bilawal on the 11 of Ramazan every year. Other important shrines and places where ceremonies are held are Pir Boher and PirHasan. 4.1.4 Conflict Resolution Pattern in the District There are two main methods of conflict resolution in the district; one is official and the other is traditional. The official system involves government and the unofficial system is based on the traditional biradrisystem. The government system functions through civil and Qazi courts. The people file suit in courts to resolve their disputes. The Qazi court at Uthal is very effective and 22 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) popular as it consumes relatively less time and cost. People prefer the biradri (brotherhood) system, where they take their issues to a senior and influential person of the community, after a lengthy discussion their disputes get settled. 4.1.5 Role, Position and Status of Women in the District According to the 1973 Constitution passed by the National Assembly, all citizens have equal rights. There is no distinction on gender basis. The State may, however, make special provisions for the protection of the rights of women and children. The labor law ensures the full participation of women in all socio-economic sectors of life. According to the law, women have the right to vote and to hold office. Special seats are also allocated for them in the National and Provincial Assemblies and local bodies. But constitutional guarantees of quality are often superseded. In practice, it is very difficult for women to uphold their legal and social rights, as local customs and traditions often prohibit it. The position of women in District Lasbela is the same as it is in other areas of Balochistan, where males hold economic and social power. The tribal chiefs are always male. The literacy rate among females is very low in Balochistan and of courses in all the districts. Lasbela ranks with regard to female literacy (20% for 15 years and above age group). Though comparatively lasbela has much better female literacy rate, it is low nonetheless. Lack of sufficient number of schools, poverty and cultural norm are factors affecting pace of literacy growth. Medical facilities for women in the area are very limited. There were only three lady doctors serving at the District's Headquarter Hospital at Hub. Women visit Pirs and Molvies for their general treatment and call traditional birth attendants for the delivery of babies. Generally, women observe purdah (veil), however in the rural areas, poor women work in the farm fields without observing purdah. Violence against women in the district has been observed but it is hardly reported. Women believe that men have the right to harass and beat them, thus, they do not seek any legal aid in this respect. Among most of the social groups, men hold a monopoly on power. All the political, religious and other social leaders are men. Denial of women's rights in matters of property and inheritance as recognized by Islam is due to the cultural code of honor, stemming from the male value system. It often entails subordination and seclusion of women from the social order. In some cases, especially in religious families, women's right of inheritance is practiced. Women are rarely allowed to own productive assets such as land or livestock. They are unpaid workers as their contribution is not only limited to the domestic activities but they also work in the field. Furthermore, their economic contribution has not been considered in most of the official statistics. The industries of Hub and Winder employ a few women; however, they live in Karachi and come daily for their job. 4.1.6 Population and Community Structure 4.1.6.1 Population and Community Structure in Gundacha Sub-project Area As earlier described that the scheme is a package of four separate integrated irrigated irrigation systems and the information are compiled accordingly. The community structures, estimated population and number of water as well as land shareholders in the project area are summarized in the following Table 4.1 and detailed village and branch wise household data is given in Annexure-C. Table 4.1: Population & Community Structure Sr. Name of Community Total No. of Estimated Estimated Estimated No. Village Structure Water & Land Male Female Population Shareholders Population Population Gundacha Branch 1 Jano Goth Roonja & Mengal 9 53 52 105 2 Mitha Goth Faqir & Syed 11 56 53 109 3 Rodini Goth Rodini 3 18 18 36 4 Faqir Goth Faqir & Syed 3 12 18 30 23 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Sr. Name of Community Total No. of Estimated Estimated Estimated No. Village Structure Water & Land Male Female Population Shareholders Population Population 5 Siapad Goth Siapad,Roonja & 8 52 39 99 Deerya 6 Warwani Goth Bandija & Syed 15 76 74 150 7 Faizwani Goth Bandija 4 32 32 64 8 Kadwani Goth Sian 8 43 53 96 9 Wadera Bandija, Muhammad Jam,Roonja & 15 97 122 219 Omar Goth Lango 10 Mula Ishaq Khaskheli,Bapra,C 11 48 61 109 Goth hatta & Sian 11 Yaqoob Goth Bandija,Sia,Syed,J am,Siapad, Motak, 12 53 49 102 Bapar & Khaskheli 12 Muhammad Bandija,Lango,Sas 14 61 71 132 Hussain Goth oli,Roonja,Jam Total 113 601 642 1,251 Jamot Branch 1 Mitha Goth Khaskheli & Roonja 31 201 164 369 2 Suleman Goth 10 51 35 86 3 Jamot Goth Khaskheli,Jamot, 10 47 40 87 Mengal,Bandija 4 Chatta Goth Syed,Mengal, Roonja,Sian,Ilyani, 12 83 57 140 Baloch 5 Lakko Goth Bandija,Chanal, Roonja,Siapad, 13 95 52 147 Umrani Total 76 477 348 829 Hingri WEIR 1 Ferozani Goth Jamot,Bajra,Roonja 18 68 72 & Sia 140 2 Achwani Goth Roonja 9 61 62 123 3 Chibb Haji Roonja Saleh 27 95 144 Muhammad Goth 239 4 Chibb Wakeel Roonja 17 126 141 Goth 267 Total 71 350 419 769 Nurg WEIR 1 Layani Goth Khaskheli & Roonja 11 48 62 110 2 Ishaqani Goth Roonja 22 71 69 140 3 Moani Goth Roonja 7 33 46 74 4 Kechani Goth Roonja & Khaskheli 6 32 39 71 5 Musani Goth Roonja 11 48 76 124 6 Nimmani Goth Roonja 16 47 59 106 Total 73 279 351 625 GRAND TOTAL 333 1,707 1,760 3,474 According to the results of the survey, the total number of water and land shareholders is 333 having an estimatedpopulation size of 3,474 souls out of which male and female share is 1,707 and 1,760. The details tribal structure and tribe wise population is shown in the Table 4.2. The Table shows that the Roonja is the dominant tribe 48.3%, Bandija is the second largest tribe 16.2% and the Khaskheli 9.2% is third largest tribe in the area. A list of households with economic activities is given in Annexure-C. All households and particularly small water shareholders will benefit from scheme development. 24 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Table 4.2: Population & Community Structure Name of Branch Tribe Strength %age Roonja 57 48.3 Bajra 4 16.2 Hingri Sia 4 1.2 Total 71 3.7 Roonja 60 2.4 Nurg Khaskheli 13 2.4 Total 73 8.0 Roonja 30 9.2 Bandija 8 3.7 Jamot 4 0.6 Siapad 1 0.9 Mengal 7 0.6 Sia 2 0.3 Jamot Khaskheli 12 0.9 Syed 9 0.6 Channal 1 0.3 Ilyani 1 0.3 Blochi 1 0.3 Total 76 48.3 Roonja 11 16.2 1.2 Bandija 45 Siapad 11 3.7 Mengal 1 2.4 Bapra 4 2.4 Sia 20 8.0 Khaskheli 5 9.2 Gundacha Syed 3 3.7 Channal 1 0.6 Ilyani 2 0.9 Faqir 2 0.6 Darya 1 0.3 Rodini 3 0.9 Chatta 2 0.6 Motak 1 0.3 Lango 1 0.3 Total 113 4.1.6.2 Population and Community Structure in Nimmi Sub-project Area As discussed earlier that the scheme is consist of improving the existing community operated irrigation system as well as incorporating additional areas for irrigation. The community structures, estimated population and number of water as well as land shareholders in the project area are summarized in the following Table 4.3. 25 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Table 4.3: Population & Community Structure Sr.N Name of Community Total No of Estimated Estimated Estimated o. Village Structure Water & Land Male Female Population Shareholders Population Population 1 Siapad Siapad 31 138 102 240 Goth 2 Habib Goth Siapad 87 491 326 812 3 Kishari Baloch,Jam,R 46 263 283 495 Goth oonja,Jamot 4 Langra Bizenjo,Muha 28 138 247 384 Goth mmad Hassani,Doda ,Roonja 5 Sour Dir Bizenjo,Sian 18 75 112 187 Goth 6 Kundi Goth Mengal,Bapra 12 54 48 102 7 Nimmi Nimmi Bent 11 71 62 126 Bent Goth 8 Jani Goth Bizenjo 8 40 35 75 9 Sher Mengal 5 23 26 49 Muhamma d Goth Total 246 1,293 1,241 2,470 According to the results of the survey, the total number of water and land shareholders is 246 having estimated population size of 2,470 souls out of which male and female population is 1,293 and 1,241 respectively. The details tribal structure and tribe wise population is shown in the Table 3.3The table indicates that the Siapad is the dominant tribe 47%, Baloch is the second largest tribe 20.3% and the Roonja 5.6% is third largest tribe in the area.Some of the households were reported not residing in the abovementioned villages.A list of households with economic activities is given in Annexure-D. All households and particularly small water shareholders will benefit from scheme development. The land shareholder of Siapad and Habib villages are not the existing water shareholders of the Nimmi irrigation scheme. They have communal land at the tail of the proposed canal and currently the land is barren. The share of the Habib Goth as reported 1/3rd of the total land and remaining will be distributed among the villagers of Ibrahim Siapad Goth. Table 4.4: Tribal Strength in Project Area Tribe Strength %age Siapad 118 47.0 Baloch 51 20.3 Roonja 14 5.6 Bizenjo 37 14.7 Sia 12 4.8 Doda 1 0.4 Mengal 8 3.2 Bapra 3 1.2 Jam 4 1.6 Jamot 1 0.4 Muhammad Hassani 2 0.8 26 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 4.1.7 Landless Households The following landless households are also settled in the project area working as tenants, labor or small businesses in Lasbela city. Table 4.5: Landless Households in Project Area Sr. No. Names of Village No. of Households Landless People on Gundacha Branch 1 Yaqoob Goth 12 2 Siapad Goth 7 3 Habib Goth 21 4 Marri Nomads (at Gundacha Weir) 42 Total 82 Landless People on Jamot Branch 1 Lakko Goth 7 2 Mihta Goth 19 3 Suleman Goth 9 4 Jamot Goth 9 Total 44 Grand Total 126 4.1.8 Village Construction The project area is consisting of rural population lives in comparative isolation. There are very few villages of the conventional type. Majority of the population live in small settlements of five to twenty houses scattered all over the project area. Mud houses or huts are built without layout or plan and without any regard to blocks. All mud houses usually have a boundary wall enclosing enough space for cattle and storage. The roof of a mud house consists of wooden beams of all shapes and sizes, cover of thick date-palm mats and a layer of mud with clay plaster at the top. It was observed that all the people were living in self-owned houses. In some cases, the owner of the land is settled within his agriculture tract away from the other population. 4.1.9 Language in the Project Area Sindhi/Lasi, Balochi, Brahvi and Urdu are the languages spoken in the project area. The Sindhi/Lasi language is the dominant language spoken in the project area about 95 percent of the population speaks. 4.1.10 Religionin the Project Area During the socioeconomic field survey it was observed that about 100 percent of the population is Muslim. 4.1.11 SocialInfrastructures in Gundacha Sub-project Area Social and physical infrastructure plays an important role in the development of the area. This section provides an overview of the accessibility of different infrastructure based on the perception of villagers. The project area of Gundacha and Jamot is partially connected with the RCD highway through a village link road. The link road is broken with washouts due to non provision of road culverts on the sections wherever; the tributaries were passing into. The Jamot areas have no direct access to the link road and are travelling into rivers and agriculture lands. When the Porali River is on peak in monsoon season, accessing the villages of Jamot area is very hard.The result of the survey revealed that there was no electricity, gas, appropriate4road. Primary level education facilities were minimal keeping in view the population size in the project area. There 4 Except the link road on Gundacha branch and the condition of the road during survey was not good. 27 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) is only one BHU in the project area and no sewerage/drainage facilities as well as no landline telephone facility are reported by the respondents in the project area. 4.1.12 SocialInfrastructures in Nimmi Sub-project Area The project area of Nimmi is partially is connected with the RCD highway through a gravel/shingle village link road. The road is not motor able in bad weathers.The result of the survey revealed that there was no electricity, gas, appropriate road. Primary level education facilities were minimal keeping in view the population size in the project area. Only one guest house (in degraded condition) situated near to the proposed Weir structure. Some of the public and communal infrastructures reported during baseline survey are summarized in the following Table 4.6. There is no health facility; sewerage/drainage facilities as well as landline telephone facility are reported by the respondents in the project area. Table 4.6: Public & Communal Infrastructures in Project Area Guest Irrigation Micro Name of Village Mosque Graveyard House Channel Hydropower Plant Sher Muhammad Goth 0 1 0 0 0 Nimmi Bent 1 0 0 0 0 Kundi 1 0 0 0 0 Langra Goth 2 0 1 0 0 Sour Dir 1 0 0 0 0 Jani Goth 1 0 0 0 0 Kishari Goth 2 0 1 1 0 Total 8 1 2 1 0 4.1.13 Education Facilities There are 14 boy’s primary schools, 05 Girl’s primary schools, 01 middle boy’s middle school and no high school in the project area. The students go for higher studies to Lasbela city (Approximately 35km), Quetta and Karachi. The details are given in the Table 4.7. Table 4.7: Village wise Educational Facilities in the Gundacha Sub-project Area Boys Girls Boys Names of High Name of Branch Primary Primary Middle Villages School Schools Schools Schools Ishaqani Goth 1 0 0 0 Musani Goth 1 0 0 0 Nurg Weir Nimmani Goth 1 1 0 0 Command Area Muani Goth 1 0 0 0 Kechani 0 0 0 0 Layyani Goth 1 0 0 0 Chibb Haji Wakeel 1 0 0 0 Goth Chibb Haji Saleh 1 1 0 0 Hingri Weir Goth Command Area Achwani Goth 1 0 0 0 Charak Goth 0 0 0 0 Ferozani Goth 1 0 0 0 Suleman Goth 0 0 0 0 28 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Boys Girls Boys Names of High Name of Branch Primary Primary Middle Villages School Schools Schools Schools Chatta Goth 1 0 0 0 Jamot Branch Lakko Goth 0 0 0 0 Command Area Mitha Goth 0 0 0 0 Mitha Goth 1 0 0 0 Rodini Goth 1 0 0 0 Faizwani Goth 0 0 0 0 Kadwani Goth 1 0 0 0 Habib Goth 0 0 0 0 Gundacha Mula Ishaq Goth 1 0 0 0 Branch Jano Goth 0 1 0 0 Faqir Goth 0 0 0 0 Siapad Goth 0 0 0 0 Yaqoob Goth 0 0 0 0 Hassan Goth 0 1 0 0 Omar Goth 0 1 1 0 There are 4 boy’s primary schools, 03 Girl’s primary schools and no middle school or high school in the project area. The students go for higher studies to Lasbela city, Quetta and Karachi. The details are given in the Table 4.8. Table 4.8: Education Facilities in Nimmi Sub-project Area Girl’s Boy’s Primary Middle High Name of Village Primary School School School School Sher Muhammad Goth 0 0 0 0 Nimmi Bent 0 0 0 0 Kundi 1 0 0 0 Langra Goth 1 0 0 0 Sour Dir 0 1 0 0 Jani Goth 1 1 0 0 Kishari Goth 1 1 0 0 Total 4 3 0 0 4.1.14 Health Facilities Only one Basic Health Unit (BHU) was reported in the Omar Goth on Gundacha branch and in the remaining areas, there was not any health facility. The people are going to Lasbela city and for more treatment they refer their patients to Karachi. The details status is given in the following Table 4.9. Table 4.9: Health Facilities in the Gundacha Sub-project Area Name of Branch Name of Villages Health Facilities Nurg Weir Command Area Ishaqani Goth 0 29 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Name of Branch Name of Villages Health Facilities Musani Goth 0 Nimmani Goth 0 Muani Goth 0 Kechani 0 Layyani Goth 0 Chibb Haji Wakeel Goth 0 Chibb Haji Saleh Goth 0 Hingri Weir Command Area Achwani Goth 0 Charak Goth 0 Ferozani Goth 0 Suleman Goth 0 Chatta Goth 0 Jamot Branch Command Area Lakko Goth 0 Mitha Goth 0 Mitha Goth 0 Rodini Goth 0 Faizwani Goth 0 Kadwani Goth 0 Habib Goth 0 Mula Ishaq Goth 0 Gundacha Branch Jano Goth 0 Faqir Goth 0 Siapad Goth 0 Yaqoob Goth 0 Hassan Goth 0 Omar Goth BHU There is not any health facility in the Nimmi Sub-project area. The people are going to Lasbela city and for more treatment they refer their patients to Karachi. 4.1.15 Drinking Water It is observed that women and children are responsible for fetching of water for drinking and domestic use. The underground water is nominal in the project area and the population use surface water after conventional treatment. Survey results showed that there are 02 tube wells, 03 dug wells, 02 water tanks and 01 natural spring and the water of the said sources is used conjunctively with canal water for drinking purpose. Out of 02 tube wells, one was reported defunct. In overall; the villagers are using the surface water of canal for drinking, livestock and other domestic use. The village wise details of drinking water resources are given in the following Table 4.10. Table 4.10: Drinking Water Resources in the Gundacha Sub-project Area Name of Water Dug Water Natural Tube Name of Villages Branch Channel wells Tank Spring wells Nurg Weir Ishaqani Goth 0 1 0 0 0 Command Area Musani Goth 1 0 0 0 0 30 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Name of Water Dug Water Natural Tube Name of Villages Branch Channel wells Tank Spring wells Nimmani Goth 1 1 1 1 0 Muani Goth 0 0 0 0 0 Kechani 1 0 0 0 0 Layyani Goth 0 0 0 0 0 Chibb Wakeel Wal 1 1 0 0 0 Chibb Haji Saleh Goth 1 0 0 0 0 Hingri Weir Achwani Goth 1 0 0 0 1 Command Area Charak Goth 1 0 0 0 1 Ferozani Goth 1 0 0 0 0 Mitha Goth 1 0 0 0 0 Rodini Goth 1 0 0 0 0 Faizwani Goth 1 0 0 0 0 Kadwani Goth 1 0 0 0 0 Habib Goth 1 0 0 0 0 Gundacha Mula Ishaq Goth 1 0 0 0 0 Branch Jano Goth 1 0 0 0 0 Faqir Goth 1 0 0 0 0 Siapad Goth 1 0 0 0 0 Yaqoob Goth 1 0 0 0 0 Hassan Goth 1 0 0 0 0 Omar Goth 1 0 1 0 0 Total 20 3 2 1 2 Survey results of the Nimmi Sub-project area is showing that there are 02 dug wells, 02 water tanks and the remaining villages are using canal water for drinking purpose. In overall; the villagers are using the surface water of canal for drinking, livestock and other domestic use. The village wise details of drinking water resources are given in the following Table 4.11. Table 4.11: Drinking Water Resources in Project Area Dug Water Water Tube Name of Village wells Tank Channel/ wells Sher Muhammad Goth 0 0 Springs 1 0 Nimmi Bent 1 0 0 0 Kundi 0 1 0 0 Langra Goth 0 0 1 0 Sour Dir 0 0 1 0 Jani Goth 1 1 0 0 Kishari Goth 0 0 1 0 Total 2 2 4 0 4.1.16 Transport Most of surveyed villages in the project area have village tracks or un-surfaced (Kacha) roads that are in bad condition except for the villages of Gundacha branch which is black top but the condition is broken on many sections due to non provision of road culverts wherever; tributaries are arising from the hilly areas. Construction and maintenance of village roads is the responsibility of local government. Onenational highway (RCD Highway Quett-Karachi) also passes through the project area and connects Sindh with Balochistan. The major source 31 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) of the human transport is motorcycles, jeep, pickups and rarely buses are running between the project area and Lasbela city. The animals from the project area transported to Lasbela city and Karachi by Trucks. The Firewood and Furniture wood is also transported through Trucks and Trolleys. 4.1.17 NGOs Working in the Area During the field survey it was observed that only one NGO naming ‘National Rural Support Program’ (NRSP), a Pakistan based NGO and is working in the Gundacha and Jamot area on water supply projects. Reportedly; the NRSP has established an umbrella organization called Village Organization (VO) and 10 Community Organizations (COs) on the village level in the area. Out of 10 Cos 6 are male and 4 are of female group of communities. During the field survey, the involvement of NGOs in any development sector was not reported by the locals in the Nimmi sub-project area. 4.1.18 Flood Impacts Severe monsoon rains in the catchment of Porali River triggers floods of an unprecedented scale, both in terms of volume and amount of land flooded. Despite forecasts rainfall, heavy downpours began in mid August, engulfing the entire district causing damage to crops, infrastructure and human settlements. The maximum rainfall during the year was from 1st July to 30th September, 2011. An indirect loss such as damage to crops due to uncontrolled flooding and disruption of irrigation supplies, water-logging of agricultural land was reported.There have been instances of heavy rains and floods happening in the district but the June/ July 2007 floods created havoc throughout the district, resulting in deaths and injuries, loss of houses, crops, livestock, livelihoods and infrastructure damage. 4.1.19 Community Awareness about Project The social baseline survey reveals that 100% awareness about the project was reported in the Gundacha and Jamot branches while 50% and 80% awareness was reported on Nurg and Hingri Weris respectively.During the social baseline survey on Nimmi Sub-project area, it was known that 100% awareness about the project was reported in the project villages except Habib and Ibrahim Siapad Goth. 4.2 SOCIO-ECONOMIC BASELINE 4.2.1 Methodology A survey of 28 Villages within the command area of each canal and Weir was conducted from the 5thSeptemebr 2015 to 15thSeptember, 2015 in order to establish a social baseline of the project area. A list of the villages visited is provided in Table 4.1.Similarly, a survey of 7 5 Villages within the command area of each proposed Nimmi sub-project was conducted in order to establish a social baseline of the project area. A list of the villages visited is provided in Table 4.2. All villages lying within the command area of the proposed project were having legal entitlement of the land and water share,were included within the social survey.The questionnaires used during the study are provided in Annexure-B. The information gained will assist in the measurement and determination of the impacts (positive and negative) on social services, livelihood and cultural pattern of the population under study. To make the analysis more compelling, qualitative data through Focus Group Discussions (FGDs) was also collected. 5 The Habib and Ibrahim Siapad Goths are already covered in the baseline for Gundacha Sub-project. 32 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 4.2.2 Basic Information of Respondent 4.2.2.1 Age ofRespondents The respondents for the socio-economic baseline survey are classified in accordance to the following age groups. The survey reveals in Table 4.12 that 9.2 of the respondent’s age was 21-30 years,16.5% respondent’s age was 31-40, 27.5% of the respondent’s age was 41- 5030.3% of the respondent's age was 51-60, 14.7% was 61-70 and 1.8% of the respondent’s age was above 70 years. Table 4.12: Age Groups of the Respondents Age Groups %age 21- 30 9.2 31- 40 16.5 41 - 50 27.5 51 - 60 30.3 61 - 70 14.7 > 71 1.8 4.2.2.2 Respondents’ Relationship with Head of Household The following Table 4.13reveals that 86.2% of the respondents were personally available for interview, 2.8% of the respondents was brothers of the head of the households and 11.0% of the respondents were son of the head of the households. Table 4.13: Relationship of the Respondent’s with Head of Household Relationship %age Self 86.2 Brother 2.8 Father 0.0 Son 11.0 Others 0.0 4.2.2.3 Gender of the Respondents The socioeconomic baseline survey results indicate that 100% of the respondents were male. 4.2.2.4 Tribal Representation in the Baseline Survey The results of the baseline survey portrayed in the following Table 4.14 indicates the tribal representation as Roonja 44%,Sian 16%,Khaskheli 13.3%,Bizenjo 4%,Mengal and Jamot 2.7%,Bandija 9.3% and Siapad 1.3%. Table 4.14: Tribal Representation in the Baseline Survey of Gundacha Sub-project Tribe Representation in %age Baizanjo 4.0 Sian 16.0 Mengal 0.0 Rodini 2.7 Ronja 44.0 Khaskeli 13.3 Jamot 2.7 Faqir 2.7 Bandija 9.3 Siapad 1.3 33 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) The results of the baseline survey portrayed in the following Table 4.15 indicates the tribal representation as Baloch 52.9%, Bizenjo26.5%,Mengal and Sian 8.8%, Roonja 2.6% Khaskheli on Nimmi Sub-project. Table 4.15: Tribal Representation in the Baseline Survey of Nimmi Sub-project Tribe Representation in %age Baizanjo 26.5 Sian 8.8 Mengal 8.8 Baloch 52.9 Ronja 2.9 4.2.2.5 Education Level of the Respondents The socio-economic baseline survey reveals that 55% of the respondents were illiterate, just over 8.3% of the respondent’s education level was primary, 34.9% respondent’s education level was middle and0.9% respondent’s education level was secondary and 32.1% were of the university level. The information in respect of education of the surveyed villages is furnished in Table 4.16. Table 4.16: Relationship of the Respondent’s with Head of Household Education Level %age No Education 55.0 Primary (up to 5 Years) 8.3 Secondary (up to 10 years) 34.9 High School (up to 12 Years) 0.9 University 32.1 Others 0.0 4.2.2.6 Settlement of the Respondents There is no migrated/settlers of other parts of the province and 100% of the respondents were local of the project area. 4.2.3 Demography 4.2.3.1 Family Size The survey data in the Table 4.17 reveals that the average family size 1-5 is 53.2%, 5-10 is 11%, 10-15 is 8.3% and above 15 is 9.2% in the project area. Table 4.17: Average Family Size Family Size %age 1 to 5 53.2 5 to 10 11.0 10 to 15 8.3 15 & above 9.2 4.2.4 Village Amenities There are no telephone connections, electricity supply for domestic as well as agriculture use, gas and sewerage system in the villages of the project area. However; some of the houses in Gundacha and Jamot area have installed solar panels for electrifying their home. 34 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) There are no telephone connections, electricity supply for domestic as well as agriculture use, gas and sewerage system in the villages of the Nimmi Sub-project area. 4.2.5 Fuel Resources On Gundacha Sub-project, the Guzara forest is available in the area and the villagers collect forest trees utilized as fuel. As reported in the baseline, averagely 2.08 monds (more than 80kg) of fuel wood are utilized per month in both summer and winter season. The communities are fetching fuel wood from his agriculture land as well as hilly areas and they are not paying for fuel woods. There is no electricity and gas (CNG & LNG) in the area. However; most of the households in the project area have installed solar panels to fulfill their energy requirements.Similarly, over the Nimmi sub-project, Guzara forest is available in the area and the villagers collect forest trees utilized as fuel. As reported in the baseline, averagely 5.57 monds (more than 200kg) of fuel wood are utilized per month in both summer and winter season. The communities are fetching fuel wood from his agriculture land as well as hilly areas and they are not paying for fuel woods. There is no electricity and gas (CNG & LNG) in the sub-project area. 4.2.6 Family System In urban areas, the nuclear family system is preferred to a joint family system in Hub and Uthal, where people are residing for professional reasons. Having limited income they prefer to live independently, whereas in the rural areas, the majority of the people live in joint families. The eldest male member takes care of all the family members and his decision is usually considered final in family affairs. In rural areas, nuclear families are very rare; however, the trend for nuclear family is rising in urban areas. The family institution is very important, as it provides social security during un-employment and financial crisis. It also plays an important role in social interaction and conflicts. The following table reveals that about 72% of those in the study area live together with their extended family (parents living with married children and their families). Families believe this is a more economical way of living as they often work together on the same land and are able to share their joint incomes to support the entire family, including elderly relatives who are unable to work. About 28% of the population is living in nuclear family system. Table 4.18: Family System in the Project Area Family System %age Nuclear family 28 Joint family 72 4.2.7 Marriage About 22.9% of the families reported marriage outside the family and 77.1% of the families were reported marriage within families. The details are given in the baseline survey Table 4.19 as follows; Table 4.19: Family System in the Project Area Marriage Pattern %age Outside the family marriage 22.9 Inside the family marriage 77.1 4.2.8 Disease During baseline survey, 60% of the respondents reported illness during the last one year in their families and 40% of the respondents have not reported any illness in their families.The baseline survey also reveals that about 65% of the patients get treatment from the Lasbela 35 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) city while 53.3% patients are getting treatment from Karachi. The Common diseases are arediarrhea, flue, typhoid and malaria. Table 4.20: Illness reported during last 1 Year Illness in Last 1 Year %age Yes 60 No 40 Table 4.21: Treatment Place Treatment Place %age Lasbela 65.0 Karachi 53.3 Others 0.0 4.2.9 Birth Rate The socioeconomic baseline survey conducted for the project indicates that the average birth rate during the period of last one year was reported 0.86. 4.2.10 Death Rate As per socioeconomic baseline survey for the project, the average mortality rate per month in the area is 1.3. 4.2.11 Money Lending As reported during the baseline, borrowing of money for agriculture purposes is not common in the project area. 4.2.12 Visit to Nearest City The baseline survey indicates that 68.8% of the responsible family members are visiting the nearest city Lasbela at the distance of approximately 35km on daily and weekly basis. The 80.7% of the family members are visiting the city to fulfill thedomestic needs and 15.6 of the respondents expressed both fulfilling domestic need as well obtaining health treatment, 1.8% are visiting the city for family relations and 0.9% are visiting for educational purpose. Table 4.22: Purpose of the Visit to nearest City Purpose of Visit %age Family/relations 1.8 Market/business/trade 80.7 Educational 0.9 Health 15.6 Others 0.9 4.2.13 CommunityPriority Needs During public consultation and baseline surveyin the project area, the needs of the communities were assessed. The baseline reveals that pure drinking water and road are the top priority of the people, education is the second prioritized need, road is third need, electricity is forth and health facilities are at the least concen in the project area. The details are illustrated in the following Table 4.23below: Table 4.23: Community Priority Need on Gundacha Sub-project Need %age 36 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Health issues 1.8 Pure drinking water 27.5 Education 22.9 Electricity 14.7 Road 18.3 4.2.14 Livestock 4.2.14.1 No of Livestock The average number and type of livestock owned in the project area is given in the following Table4.24. Table 4.24: Average No & Type of Livestock Ownership in the Project Area Livestock Ownership Average ownership No. of Buffalows 0.0 No. of cows 2.6 No. of Goats 12.6 No. of sheep 1.9 No. of oxen 0.0 No. of calves 0.0 No. of donkeys 0.2 No. of horses 0.0 No. of chiken 11.3 4.2.14.2 Value of Livestock During baseline survey, variations information pertinent to the values of the livestock was obtained and analyzed. The average value of the livestock most frequently exist in the area is given in the following Table4.25. Table 4.25: Average No & Type of Livestock Ownership in the Project Area Type of Livestock Average Value Value of cows 76033 Value of Goats 8015 Value of sheeps 15640 Value of chicken 511 4.2.14.3 Source of Fodder The farmers are grazing their herds in nearest rangeland and fodders are cultivated in the agriculture land for livestock. The farmers are not purchasing fodder for livestock from out sources. 4.2.15 Livelihood& Income The baseline survey indicates that the agriculture in the primary sources of income, livestock as secondary source and laboring as tertiary source of income. While very few farmers are doings business and small number of the family members are doing government jobs. 4.2.15.1 Family Members Involvement in Livelihood Earning The family members involved in the livelihood earning are 100 male and their age is between 16-65 years. The female members of the family are not involved in livelihood earning. 37 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 4.2.15.2 Monthly Expenditures The socio-economic baseline survey reveals the following average monthly domestic expenditures in the project area. Table 4.26: Monthly Average Domestic Expenditures in the Project Area Average Monthly Purpose Expenditures Food items 22,908 Firewood/energy source 0 Education 143 Health 1,485 Social/reccreational activities 0 4.2.16 Anticipated Losses due to the Project None of the below mentioned losses on Gundacha Sub-project(except trees) due to the proposed project development is anticipated. Table 4.27: Anticipated Losses in the Project Area Anticipated Loss Results Loss of resident No Loss of cultivated land No loss of trees Yes Loss of livelihood No Loss of other infrastructure Yes Loss of uncultivated land Yes Similarly, some of the below mentioned losses on Nimmi sub-project (excluding trees) due to the proposed project development is anticipated, if the alignment is not changed. The proposed main irrigation canal is passing into uncultivated barren land after RD: 3+000 up to the tail end (RD:24+000) and into the RCD highway approximately at RD:3+500. The branch canals (Kishari & Kunri) are also passing into uncultivated barren land. There are some building and commercial structures approximately at RD:3+500 and RD:7+500. There are alternate options to shift the alignment of the main canal to open areas. 4.2.17 Housing The baseline survey of the water and land shareholder in the command area of the proposed project indicates that 100% of the houses are owned by the communities and there is no farmer who is residing in rented or free home. The types of houses are katcha (muddy) as discussed earlier. 4.2.17.1 No. of Rooms The average numbers of rooms owned by the target communities in the project area are 1-5 26.67% and 5-10 are 73.33%. The details are given in the following Table 4.28as given below: Table 4.28: Average No & Type of Livestock Ownership in the Project Area Room Ownership Average ownership 1 to 5 18.35 5 to 10 73.39 10 & above 4.59 38 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 4.2.17.2 Bathrooms The average numbers of bathrooms (open area surrounded by boundary walls) owned by the target communities in the project area are 93.3%. The details are given in the following Table 4.29 as given below; Table 4.29: Bathroom Ownership in the Project Area Status Bathrooms Ownership Yes 93.3 No 6.7 4.2.17.3 Plot Size The baseline survey reveals that the plot size in the project area between 2500ft. to 3500 sq. ft. 40% and 3600 sq. ft. to 5000 sq. ft. is 60%. The results are displayed in the following Table 4.30. Table 4.30: Plot Size in the Project Area Plot Size(Sq. ft.) %age 2500 to 3500 40 3600 to 5000 60 4.2.17.4 Room for Animals No special rooms for animals were reported during the baseline survey; however; some of the farmers have constructed animal sheds near to their houses. 4.2.18 Landholding&Its Use The baseline survey reveals that the average individual land ownership in the overall project area is cultivated 6.93 acres and uncultivated 14.44 acres. Table 4.31: Individual Land ownership in the Project Area Land Type Average Land Ownership (in acres) Cultivated 6.93 Un-cultivated 14.44 Banjar Jadeed 0 Banjar Qadeem 0 Ghair mumkin 0 Fruit orchard 0 Table 4.32: Land type to be Affected Type To be likely Affected Partially during construction work on Jamot Gundacha scheme like disposal Cultivated of construction debris etc. Un-cultivated Partially same as above Banjar Jadeed No Banjar Qadeem No Ghair mumkin No Fruit orchard No 39 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 4.2.18.1 Nature of Farming The land tenure in the project area is approximately 68.8% owner operated and 31.2% tenant operated. The 31.2% tenant operated land owners are residing outside the project area and the land is given on lease or annual tenancy. Those who are residing outside the project area are not covered in the baseline; therefore; the baseline survey indicates 100% owner operated land. 4.2.18.2 Sale & Purchase of Land The baseline survey indicates that sale and purchase of the land is common in the area. The sale and purchase of land is evidenced on stamp paper which have legal reliability. 4.2.19 Agriculture Implements The individual ownership of the following agriculture implements shown in Table 4.33 were reported during the baseline survey. Table 4.33: Type of Agriculture Implements Owned by Farmers Type of Implements Ownership in % age Plough for oxen 0.0 Plough for tractor 11.9 tractor 9.2 Spray machine 22.0 Trolley for tractor 9.2 Thresher 55.0 4.2.20 Agriculture Inputs The average agriculture expenses per year as reported during the socio-economic baseline survey are summarized in the following Table 4.34. Table 4.34: Estimated Expenses Per Year/Acre Expense Quantity Unit Rate per Acre Seeds - Cotton 10 KG 2,000 - Wheat 40 KG Fertilizer - UREA 1 Bag 50 KG 2,000 - DAP 0.5 50 KG 1,750 Pesticides (Litter) 0 0 0 Plowing Per Acre Hrs 3,000 Harvesting - Cotton Per Acre Hrs 7,000 - Wheat Per Acre Hrs 3,000 Total 18,750 Total Acers (Approximately) 19 356,250 4.2.21 Seasonal Earnings During the baseline survey, the following average seasonal earnings in rupees per acre were reported in the project area. Table 4.35: Average Seasonal Earnings/acre in Project Area Season Average Seasonal Earning/Acre (in PKR) 40 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Rabi 47,444 Kharif 10,444 4.2.22 Trees Around 843trees including bushes(mostly Acacia nilotica) were observed and recorded along the length of the existing Gundacha irrigation canal. Similarly; 363 trees including busheswere observed and recorded along the length of the existing Jamot irrigation canal. Around179 trees including bushes(Tamarix Sp., Acacia Nilotica & Kabbar) were observed and recorded along the length of the existing Nimmi irrigation canal. The exact number of trees likely to be cut down cannot be confirmed at this stage. The Contractor will make efforts to avoid trees cutting. The Contractor will mark those trees and prepare tree inventories which are unavoidable during joint walk through survey with the PMU and PIC. At the implementation phase, the cut down tress shall be handed over to the farmers who are owner of the trees. 4.2.23 Commercial Assets There are no commercial assets within RoW of the Gundacha sub-project likely to be affected.Similarly, there are some commercial assets within RoW of Nimmi sub-project but there are alternate options to shift the existing alignment. 41 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 5 PROJECT IMPACTSAND MITIGATION PLANNINGFOR SUB-PROJECTS IN PORALI RIVER BASIN 5.1 Land Acquisition for Gundacha Sub-project The impact assessment for the identified Year One schemes in Porali River Basin is based on current engineering design. This engineering design gives an approximate footprint on the ground and maps out the maximum area of land needs for the schemes. This alignment will be reviewed and further optimized by the contractors once they are engaged and mobilized before they finalize the alignment through the development of construction drawings and demarcate the alignment on the ground. Impact minimization is a major consideration in the contractors’ finalization of the alignment in further consultations with the communities. Only then the contractors will demarcate the alignment on the gorund and the scheme impacts of lands and trees will be final. The branch and structure wise status of possible land acquisition and resettlement given below is based on the current engineering design and gives the maximum extent of possible impact, and does not reflect the final impacts. 5.1.1 Gundacha Branch The Gundacaha irrigation canal is a century old community operated existing irrigation system. This system is consisting of breach able diversion bund situated in the Porali River bed and approximately 11km long earthen canal and additional 1km is to be extended under this project. The area where 1km canal extension is under proposal was barren land and now the farmers are going to develop the land due to the proposed project development and it is expected that the water will be available. The SIAMP team have conducted walk through survey along the length of the canal jointly with the farmers in the month of September, 2015. The resettlement and land acquisition survey was conducted in the RoW (as decided 8m) as the resettlement and land acquisition questionnaires were envisaged; there were no public, private, residential and commercial structures within RoW. 5.1.1.1 Existing Sections of Canal The X-sections of the existing canal varies and on some point the width of the canal was measured and found beyond 8m as required for RoW and on some sections at mid and tail end is below 8m. 5.1.1.2 Community Structures along RoW During survey, some of the structures were observed close to the existing canal located outside the RoW. These structures will not be affected due to the project development. The summary is provided in the following Table 5.1. Table 5.1: Community Structures near to the RoW Sr. Approximate RD Falling within RoW Structure Name of the Owner No. Reference (Yes/No) 1 House Muhammad Rahim 0-1 Right Side No 2 Animal Qadir Bux 1+500 Right side No Shed 3 Graveyard Communal 1+500 to 2+500 No 4 House Muhammad ishaq 2+500 No 5 Animal Abdul Ghani 2+700 No Shed 42 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 5.1.1.3 Tree Inventory During walk through survey along the existing irrigation canal, 843trees including bushes(mostly Acacia nilotica) were observed and recorded along the length of the existing Gundacha irrigation canal. These trees are used as fuel source by the communities or sell it in the city.The exact number of trees likely to be cut down cannot be confirmed at this stage as the canal alignment is not final yet and it will determined and finalized by the contractors. The Contractor will make efforts to avoid trees cutting. The Contractor will mark those trees and prepare tree inventories which are unavoidable during joint walk through survey with the PMU and PIC. At the implementation phase, the cut down tress shall be handed over to the farmers who are owner of the trees. The RD wise estimated details and owner ship is given in the following Table 5.2below: Table 5.2: Tree Inventory on Gundacha Branch EstimatedNo. of Treeson Approximate RD Reference Name of Landowner Banks of Canal Right Side Left Side Abdul Haq 8 0 Alam Kahn 13 0-1 Haji Ahmad 19 7 Muhammad Ishaq 0 0 Abdullah 0 47 1-2 Abdul Ghafoor 0 27 Muhammad Amin 0 14 2-3 Muhammad Ishaq 7 0 Abdul Ghani 6 Mitha Khan 0 6 Abdul Hameed 0 34 3-4 Jumma Khan 0 8 Muhammad Yousuf 18 0 Abdul Razzaq 4 0 Abdullah 4 Ismail 10 14 4-5 Jam Kamal Khan 25 Abdul Aziz 14 0 Muhammad Sharif 41 0 Taj Muhammad 8 Muhammad Karim 0 0 Muhammad Usman 18 0 Muhammad Yousuf 0 15 Allauddin 31 0 5-6 Yousuf 0 51 Master Yousuf 18 0 Kazim 0 16 Dr.Abdul Haq 0 71 Hamza 31 0 Asghar 58 0 Muhammad Rahim 0 0 6-7 Abdul Majeed 10 0 Fateh Muhammad 0 20 Ghulam Nabi 10 0 Muhammad Yaqoob 44 0 7-8 Muhammad Azeem 0 35 Haji Ibrahim Sasoli 0 0 43 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Ahmad Khan 21 Alam Kahn 0 52 Ghulam Rasool 5 0 8-9 Abdul Hakeem 3 0 Dr.Abdul Haq 0 0 Total 376 467 GRAND TOTAL 843 5.1.2 Jamot Branch The Jamot irrigation canal is a century old community operated existing irrigation system. This system is consisting of breachable diversion bund situated in the Porali River bed and approximately 12km long earthen canal. The SIAMP team have conducted walk through survey along the length of the canal jointly with the farmers in the month of September, 2015. The resettlement and land acquisition survey was conducted in the RoW (as decided 8m) as the resettlement and land acquisition questionnaires were envisaged; there were no public, private, residential and commercial structures. 5.1.2.1 Existing Sections of Canal The X-sections of the existing canal varies and on some point the width of the canal was measured and found beyond 8m as required for RoW and on some sections at mid and tail end is below 8m. As proposed in the engineering design, single Weir structure is designed for both canals and Jamot will be connected with the Gundacha through a new canal needs to be developed on back side of the Ghagoo Bund. Some portion of the existing land is used as quarry while some portion is used for cultivation. The length of the proposed new connecting canal is approximately 915 meters. This portion of land is owned by Suleman Roonjo. He is reportedly settled in Hub city. Currently this land is irrigated through lift irrigation as shown in pictures. A diesel operated machine is installed and water is supplied through pipes. Approximately 9 trees are likely to be affected due to the proposed interventions. This portion of land is not irrigable by existing Jamot branch as the existing canal is in deep cut and the land is on elevation. After development of the proposed canal, it is anticipated that the land owner will receive irrigation water free of cost. 5.1.2.2 Tree Inventory During walk through survey along the existing irrigation canal, 363 trees were observed and recorded along the length of the existing Jamot irrigation canal. The exact number of trees likely to be cut down cannot be confirmed at this stage. The Contractor will make efforts to avoid trees cutting. The Contractor will mark those trees and prepare tree inventories which are unavoidable during joint walk through survey with the PMU and PIC. At the implementation phase, the cut down tress shall be handed over to the farmers who are owner of the trees. The RD wise estimated details and ownership is given in the following Table 5.3. Table 5.3: Tree Inventory on Jamot Branch Estimated No. of Trees along the Canal Bank Name of Landowner Right Side Left Side Jan Muhammad 0 3 Ghulam Muhammad 11 Janoo 0 4 Soomar 8 Ghulam Muhammad 0 14 Muhammad Rafiq 24 44 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Estimated No. of Trees along the Canal Bank Name of Landowner Right Side Left Side Hussain Shah 0 11 Ghulam Muhammad 8 0 Alam Khan 9 0 Haji Ahamd 3 0 Haji Saleh 4 0 Allah Dina 24 0 Jumman Shah 0 6 Jumma 0 8 Jumman Shah 0 6 Haji Sado 0 4 Wali Muhammad 0 7 Muhammad Azam 19 Ali Shah 0 16 Muhammad Alam 36 Ahmad Sindhi 26 Sardar Mehrullah 0 35 Muhammad Anwar 17 0 Sardar Mehrullah 7 0 Abdul Jabbar 0 0 Manzoor 0 0 Bhago 0 0 Muhammad Haroon 0 0 Essal 2 Haji Abdul Karim 0 0 Qalandarani 0 0 Haji Adal 4 0 Abdullah Shah 14 0 Suleman 0 4 Muhammad Sharif 0 3 Abdul Jabbar 0 0 Dr.Azeem 14 0 Muhammad Yaqoob 12 0 Total 216 147 Grand Total 363 5.1.3 Hingri& Nurg Weirs Under the engineering proposal, the existing Hingri and Nurg weirs are to be rehabilitated and the development or lining of irrigation canal is not in the proposaland therefore; the acquisition of land is not required. 5.2 Land Acquisition on Nimmi Sub-project The SIAMP team have conducted walk through survey along the length of the canal jointly with the farmers during September 2015. The resettlement and land acquisition survey was 45 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) conducted in the RoW (as decided 8m) in accordance to the resettlement and land acquisition questionnaires. The existing situation along the RoW is elaborated in the following sections: 5.2.1 Width&Alignment of Existing Canal The proposed Nimmi irrigation canal when offtaking from the Weir is immediately passing into agriculture productive land. This tract of land is owned by Sher Muhammad Mengal settled in Sher Muhammad Goth on left bank of the Porali River. The length of the proposed canal passing into the agriculture productive land is approximately 300ft and approximately the total land to be acquired is 0.18 acre (7874 ft). After 300ft from the starting point, the channel is passing into Hund River bed and finally reaches to the existing irrigation channel in the command area.Some tracts of land are also situated on left bank of the river and upstream of the proposed Weir structure.The existing irrigation canal starts approximately from RD:1+000 and ends at RD:3+000. The following pictures (taken randomly) are illustrating the existing section of the canal. 5.2.2 Alignment of Main New Canal Approximately after RD:3+000, the existing irrigation canal ends and the alignment of the proposed new canal starts. The proposed new canal is trespassing into barren land, passing upstream of the Sour Dir village and intersecting into the RCD highway at RD:3+500. The widh of the RCD highway is measured 400ft. This area is public and communal land. This is only a proposal and is still under discussion with the communities as this is new alignment and will take more land. There is no decision yet to include this part into the project. 5.2.3 Alignment of Kundi Minor The length of the Kundi minor is only 450m. The branch canal is intersecting the RCD highway at RD:4+749 of main canal, aligning into barren land and passing into settlements. 5.2.4 Alignment of Kishari Minor The proposed Kishari minor is offtaking at RD:12+000 from the main canal and total length of minor is 5000m only. 5.2.5 Community Structures along RoW During survey some of the structures were observed close to the existing canal located inside and outside the RoW. The summary is provided as in the following Table 5.4 and illustrated in pictures. Table 5.4: Community Structures near to the RoW Falling within Mitigation Option Sr. Name of the Approximate Structure RoW No. Owner RD Reference (Yes/No) 1 Wood Jan Muhammad 3+500 L/S Yes The alignment can Shop be shift to the right 2 Hotel Muhammad 3+500 L/S Yes side and space is 3 4 Soomar (Jano 3+500 L/S Yes available. Abandoned Goth) Rooms 4 2 trees Muhammad 3+500 R/S Yes 5 Abandoned Tika Khan Yes The alignment can House be shift to the right 6 Mosque Communal 7+000 R/S Yes side and space is 7 7 trees Tika Khan 7+000 R/S Yes available. 8 Hotel Tika Khan 7+000 R/S Yes (operated by 46 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) M.Zahid s/o Abdul Rasool) 9 Tyre Tika Khan 7+000 R/S Yes Puncture Shop 10 Pucca Not known 7+500 R/S No Space is available Building As illustrated in the following pictures, the abovementioned structures are avoidable as there is option to shift the proposed alignment to the open areas. The contractors will make the final adjustment of the alignment and demarcate the footprint on the ground. As discussed with engineers and indicated above, all these structures can be avoided through shifting the alignment and shifting the alignment preferred and possible. 5.2.6 Tree Inventory During walk through survey along the existing irrigation canal, 179 trees (Tamarix Sp, Acacia Nilotica & Kabbar) were observed and recorded along the length of the existing irrigation canal. These trees are sources of fuel or sell it in the city. The exact number of trees likely to be cut down cannot be confirmed at this stage. The Contractor will make efforts to avoid trees cutting. The Contractor will mark those trees and prepare tree inventories which are unavoidable during joint walk through survey with the PMU and PIC. At the implementation phase, the cut down trees shall be handed over to the farmers who are owner of the trees. The RD wise estimated details and owner ship is given in the following Table5.5. Table 5.5:Tree Inventory on Existing Irrigation Canal Nimmi No of Trees Falling in RoW Approximate RD Reference Name of Landowner Right Bank Left Bank Abdul Majeed 0 35 0-1 Takkari Ibrahim 0 5 Abdul Khaliq 0 9 Mula Ishaq 0 11 Muhammad Hashim 0 15 Mula Ishaq 0 8 Muhammad Hashim 0 39 Mula Ishaq 0 10 1-2 Muhammad Siddiq 0 10 Saifullah 0 10 Muhammad Arif 0 7 Ghafoor 0 10 Muhammad 0 10 Total 0 179 5.3 Impact Assessment And Mitigation Measures 5.3.1 Land Acquisition& Resettlement on Gundacha Sub-project In the light of abovementioned baseline information and situation analysis, the issue of land acquisition and resettlement is concluded with the following key findings:  The project is planning to undertake lining of the existing Gundacha and Jamot canals’ rehabilitationincluding the existing Hingri and Nurg weirs. The project is not working on development of new canal development and structures requiring extra land. 47 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP)  The primary impact area where the proposed lining of canals and rehabilitation of weirs works are planned is the ownership of farmers. The farmers have indicated theirwillingness to contributed their pieces of land to the project for the irrigation canal, main reason being that these are communal works and they are the primary beneficiaries.And therefore; acquisition of land is not required  The SIAMP team measured some of the sections of Jamot and Gundacha canals randomly, it is anticipated that the proposed canal sections can be achieved within available existing canals sections’ RoW.  There is no proposal of irrigation canal in the design of Hingri and Nurg weirs and the existing structures are proposed to be rehabilitated. Therefore, the issue of land acquisition and damage to any structure is not anticipated.  The baseline data reveals that no public, private, residential and commercial structures are observed within the RoW of the Gundacha and Jamot canals.  As agreed with the community, the trees and bushes will be cut and taken by respected owners which usually are used as fuel wood in the project area and this cutting will be free of cost. From project side against every tree cut, 3 to 5 nursery plantation will be made to mitigate the impact and the project will take care of the newly planted trees for the initial three years to ensure they survive. This approach is discussed and agreed with the owners. This will be implemented by the contractors. 5.3.2 Land Acquisition & Resettlement on Nimmi Sub-project In the light of abovementioned baseline information and situation analysis, the issue of land acquisition and resettlement is concluded with the following key findings:  The project is planning to undertake lining of the existing canal as well as development of new canal. The existing canal designed sections are anticipated to be achieved within the available space while the new canals development requires land. The primary impact area where the lining of existing canal from RD:1-3+000 is the ownership of farmers. The farmers dedicated their pieces of land to the project for the irrigation canal and therefore; the acquisition of land is not required. Another round of consultation with the farmers shall be carried out soon.The SIAMP team measured sections of existingNimmi canal, it is anticipated that the proposed canal sections can be achieved within available existing canals sections’ RoW .  The tract of land which is owned by Sher Muhammad Mengal settled in Sher Muhammad Goth on left bank of the Porali River. The total length of the proposed canal passing into the agriculture productive land is approximately 300ft and approximately the total land to be acquired is 0.18 acre (7874 ft.). Consultation was arranged with Sher Muhammad Mengal and he expressed the view that the canal alignment in one sense is beneficial to provided regular water supply to his land and on the other side he is losing his land. His land is situated in the potential river bed and prone to frequent flood erosion and damage of standing crops. He requested for the provision of protection (gabion works) to his land under this project and in return, he will donate the required piece of land to the project.  The baseline data reveals that no public, private, residential and commercial structures are observed within the RoW except at RD:3+500, there are some existing Katcha commercial buildings on both sides of the RCD highway closer to the RoW. The PMU has agreed to slightly shift the alighnment which is possible as extra vacant and barren land is available to save the structures.  As agreed with the community, the trees and bushes will be cut and taken by respected owners which usually are used as fuel wood in the project area and this cutting will be free of cost. From project side against every tree cut, 3 to 5 nursery plantation will be made to mitigate the impact, and and the project will take care of the newly planted trees for the initial three years to ensure they survive 48 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 5.4 Memorandum of Understanding (MoU) on Land Donation During consutltation with the communities, the farmers were willing to donate the land voluntarily for the anticipated benefits of the proposed sub-projects. In addition, an MoU has been prepared to be singed in both river basins with the land oweners (likely to be affected) from where the proposed infrastructures are passing (Figure:5.1). The Memorandum of Understanding (MoU) shall be signed between PMU of IPD and the landowners on stamp paper, the specimen of which in Urdu is given here. Principles of donation and theirworking processes are described in this plan to ensure transparency, voluntary nature of this donation and avoid future confusions. These principles and processes will be followed through when the civil works alignment is finalized and need of land is determined. 49 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Figure 5.1: MoU for Land Donation 50 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 5.5 Possible Land NeedIssue and Approach to Address That Given the design, alignment, mostly rehabilitation, and size of the proposed structures, the land needs will be resolved through using existing public lands or community donations. In case of donations, in order to ensure a transparent process, non-pressuring environment will be created and considering its voluntary nature, documentation will be prepared to record the following: 1 the ownership of the land and evidence indicating the voluntary nature of the donation; 2 the appropriateness of the donation for the intended purpose; 3 the economic status of the donor that he/she is above the poverty line or whose remaining holdings are economically viable; 4 no encumbrances on the land; 5 no negative livelihood impact on any vulnerable groups; 6 no compensation to be paid, and 7 that the owner gives up all claims on the land and the title will be transferred to the recipient through procedure prescribed by the law of the state. The documentations will be prepared reviewed by the relevant district and government departments for inclusion in the districts’ Annual Development Plan. The documentation will be filed at district government offices for regular monitoring and supervision to check for compliance with this Resettlement Policy Framework. These will also be submitted to the PMU and the World Bank. The consultation process will be documented, and the above process will be completed before actual possessingof the land. Grievances related to issues of land donations will be reported and addressed through the existing government system and project management setup. Any grievance arising from land donations will be redressed by the established mechanism by the PMU and relevant District Revenue and other departments. All grievances will be recorded in writing. The monitoring and evaluation teams and the FOs will also serve as a channel for facilitating grievance redress. 5.6 Indigenous peoples It is indicated through field experiences and extensive consultation exercises that there are no indigenous groups as defined under the World Bank Policy OP.4.10. This is also confirmed through public consultations with all relevant stakeholders. Therefore, the project as designed is not triggering World Bank Policy 4.10 on Indigenous Peoples. However, screening should continue for all project interventions during implementation for rest of all the sub-projects. In the eventuality that such groups are identified, an Indigenous Peoples Development Plan would be developed to include actions to mitigate possible impacts and ensure culturally appropriate benefits to these people. 51 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 6 CONSULTATION - COMMUNITY AND STAKEHOLDER’S ENGAGEMENT 6.1 Background Public consultation and community engagement is one of the key regulatory tools employed to improve transparency, efficiency and effectiveness of regulations for a development project. It involves actively seeking the opinions of those interested or affected by a project. It is a two- way flow of information, which may occur at any stage of development from project identification through planning, design, construction and operation. It may be aprocess or a continuing dialogue between project implementation authority and the affectees.Consultations are increasingly concerned with the objective of gathering information and find the acceptable solution. For new projects that have social impacts on the local communities, public consultation will not be a single conversation but a series of opptions to create understanding about the project. Open consultation sessions were held with different stakeholder groups who may be affected positively or negatively by the proposed project. The consultation process was carried out in accordance with the World Bank Operational Policy on public consultation. The purpose of consultation process was to carry out and assemble feedback by means of:  Meetings with the Farmers of Gundach, Jamot, Nurg and Hingri.  Views and Photos of community consultation are given in the report. The community consultation and engagement is a contineouse process to be continued throughout the project cycle. As discussed, a Farmer Organization (FO) shall be established on each sub-project and would be registered with Balochistan Irrigation and Drainage Authority (BIDA) under the BIDA Act and CIFO Regulations. 6.2 Objectives Participation mechanisms facilitate the consultative process and include: information sharing and dissemination; disclosure; and participation of all stakeholders in the project related activities so that their views and concerns shall be addressed properly and ensure them that they are actual beneficiaries of the project. It is of basic importance to involve representatives of local communities’ right from the start. The institutional arrangements should also be in place for continuous consultation throughout the process of planning to implementation of the project. The consultation with various stakeholders was carried out in accordance with the World Bank Operational Policy on public consultation. 6.3 Identification of the Stakeholders Stakeholder analysis/identification is a way of determining who among stakeholders can have the most positive or negative influence on an effort, who is likely to be most affected by the effort, and how you should work with stakeholders with different levels of interest and influence. The Stakeholders are people, groups, Non-Governmental Organizations (NGOs) if working in the area on the same nature of projects, Community Based Organization (CBOs), or institutions that may be affected by, can significantly influence, or are important to the achievement of the stated purpose of a proposed intervention. Generally, stakeholders can be classified into three groups: 6.3.1 PrimaryStakeholders Primary stakeholdersare are those which are directly related, either positively or negatively, by an effort or the actions of an agency, institution, or organization. In case of Gundacha,Hingri/Nurg Project, the Primary Stakeholders may include; 52 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP)  Potential PAPs are the farmers whose land is situated on the right and left side of the Gundacah and Jamot branches where the standing timber trees are likely to be cut down falling within the pre-determined RoW of 8 meters to achieve the designed sections of the proposed canal lining.  The general population / residents, as well as any institutions, Government departments, NGOs or CBOs (CBOs established by NRSP were consulted) within primary impact zone who that may subject to direct or indirect impact on their residences or access to their workplaces during the construction period, or by any kind of project action, or who may havepersonal interests or concern with the project.  Farmers of Secondary Impact Zone in the command area of Gundacha,Jamot canals and Hingri and Nurg weirs which may potentially impacted by this project, positively in the long term through increased efficiency and functionality of the canal, and also, potentially, may be negatively due to the minor risk of disruption irrigation flows during construction and cutting of trees falling within RoW. This consultation was carried by a full-fledged team of Sociologists in the month of September 2015. 6.3.2 Secondary stakeholders Secondary stakeholders are people or groups that are indirectly affected, either positively or negatively, by an effort or the actions of an agency, institution, or organization. 6.3.3 Key stakeholders Key stakeholders, who might belong to either or neither of the first two groups, are those who can have a positive or negative effect on an effort, or who are important within or to an organization, agency, or institution engaged in an effort. The key stakeholders in case Gundacha,Hingri/Nurg Project may be political leaders, influential community members and other local representatives including Imams, and teachers of local schools. 6.4 Methodology In order to get spontaneous, blunt and candid responses, scoping sessions in the target canalsand Weirs command areas need to happen.The scoping sessions were held to extract qualitative information about the perception, apprehensions and for developing the baseline. The views of the farmers were formally recorded and effort was made to make those beneficial for the Project. The purposes of the meetings with stakeholders were to:  Inform the farmers about the objectives of the project and the scope of work involved in the execution of the Gundacha,Nurg/Hignri project;  Provide a forum for the initial feedback of critical social issues; 6.5 Meetings with Stakeholders 6.5.1 Consultation with Farmers of Gundacha Branch At the start of baseline survey, a meeting was arranged with the farmers. The farmers were briefed about the objectives of the project and they were prepared for participation in walk through resettlement survey along the canal and cooperation in baseline data collection. At the end of the survey, another meeting of the farmers were organized at Gaghoo Bund (proposed and existing Weir site) and the farmer were briefed about the proposed engineering interventions and findings of the walk through survey on Gundacha branch. In the first meeting, the farmers shown their willingness in participation and cooperation and in the second meeting, the farmers shared their views about the project and given it in written form as given Figures 6.1 and are also summarized in the following Table 6.1. The meetings briefs are given below: 53 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Table 6.1: Consultation with the Communities and their Views at Gundacha Branch Venue & Date 1st Meeting at Janoo Goth Gundacha on 5th September,2015 2nd Meeting at Ghagoo Bund Gundacha on 9th September, 2015 Location/Venue Gundacha BIWRMDP Mr. S.M Kakar Consultants Team Mr.Gulzar Khan Mr.Yasir Habib Members Mr.Ghlam Rasool Siapad Results/Outcome  The farmers expressed their willingness and cooperation with the project staff during survey and implementation of the project.  They have expressed willingness to provide land if required voluntarily(without demanding any compensation) for completing the designed canal and other appurtenant structures.  They have also committed for not demanding or creating any problem in cutting of trees along the banks of canal, in case; ifthe cutting was unavoidable during construction phase.  They have confirmed that there is no residential, commercial, public or private structure within RoW of 8m and committed if the communities constructed any building within 8m RoW after the cutoff date (as agreed 9th September, 2015) will be demolished during construction phase and will be responsibility of the builder/owner.  Despite the earlier dissemination of the information about the scheduled meeting, those farmers who were not present in the firstor second meeting, in case, if they are raising any issue or creating any hurdles for the project, will be the responsibility of the sitting/presentfarmers to resolve and handle the matter.  The farmers requested to the SIAMP team to incorporate the social structures (women water collection structures, structures for livestock drinking and abolition structures for the males) in the drawings and contract of the contractor.  The people are facing drinking water problem; therefore; they have requested to the SIAMP team to incorporate the water supply component in the project.  The Porali River is eroding fertile land and the farmers requested for incorporation of gabion works wherever; the river is eroding the fertile land.  The farmers also requested for provision of road culverts on the canal.  They have raised the demand of providing a separate Weir for the Jamot branch and if the existing proposal of single Weir was followed; will create problem in future for water distribution and river sediment as full nutrients for their crops. Table 6.2: List of Farmers Consulted on 5th September, 2015 Sr. No. Name of Participant Father's Name Tribe Village Name Muhammad 1 Muhammad Omar Muhammad Bux Bandija Omar 2 Abdul Rehman Azad Muhammad Ishaq Siapad Siapad Goth Muhammad 3 Mitha Khan Usman Bandija Mitha Goth 4 Muhammad Ibrahim Ghulam Hussain Siapad Siapad Goth 5 Muhammad Saleh Haji Ishaq Bandija Mitha Goth 6 Muhammad Amin Muhammad Saleh Bandija Mitha Goth 54 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Sr. No. Name of Participant Father's Name Tribe Village Name Rodini 7 Abdul Rehman Muhammad Siddiq Mengal Rodini Goth 8 Muhammad Karim Muhammad Siddiq Mengal Rodini Goth 9 Amanullah Allah Din Faqir Faqir Goth 10 Abdul Qadir Abdul Rehman Bandija Abdullah Goth 11 Muhammad Sharif Habib Siapad Habib Goth Muhammad 12 Muhammad Azam yaqoob Sian Kadwani Goth 13 Abdul Ghafoor Abdul Rehman Bandija Abdullah Goth 14 bdul Qadir Muhammad Bandija Mitha Goth 15 Ghulam qadir Muhammad Bandija Mitha Goth 16 Muhammad Siddiq Haji Ahmad Roonja Jano Goth 17 Abdul Sattar Haji Khaskheli Jano Goth Muhammad 18 Muhammad Ismail Hashim Khaskheli Abdullah Goth 19 Ghulam qadir Muhammad Saleh Bandija Mitha Goth 20 Muhammad rafiq Muhammad Ismail Bandija Omar Goth 55 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 56 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Figure 6.1: Agreement of Gundacha Branch Farmers 57 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 6.5.2 Consultation with Farmers of Jamot Branch The farmers of Jamot branch were briefed on village level about the objectives of the project during socio-economic baseline and resettlement surveys. At the end of the survey, another meeting of the farmers were organized at Gaghoo Bund (proposed and existing Weir site) and the farmer were briefed about the proposed engineering interventions and findings of the walk through survey on Gundacha branch.The farmers shared their views about the project and given it in written form as given Figures6.2 and are also summarized in the following Table 6.3. The meetings are illustrated in the following pictures. Table 6.3: Consultation with the Communities and their Views at Gundacha Branch Venue & Date 1st 2nd Meeting at Ghagoo Bund Gundacha on 9th September, 2015 Location/Venue Gundacha BIWRMDP Mr. S.M Kakar Consultants Team Mr.Gulzar Khan Mr.Yasir Habib Members Mr.Ghlam Rasool Siapad Results/Outcome  The farmers expressed their willingness and cooperation with the project staff during survey and implementation of the project.  They have expressed willingness to provide land if required voluntarily(without demanding any compensation) for completing the designed canal and other appurtenant structures.  They have also committed for not demanding or creating any problem in cutting of trees along the banks of canal, in case ifthe cutting was unavoidable during construction phase.  They have confirmed that there is no residential, commercial, public or private structure within RoW of 8m and committed if the communities constructed any building within 8m RoW after the cut off date (as agreed 9th September, 2015) will be demolished during construction phase and will be responsibility of the builder/owner.  Despite the earlier dissemination of the information about the scheduled meeting, those farmers who were not present in the first or second meeting, in case, if they are raising any issue or creating any hurdles for the project, will be the responsibility of the sitting/present farmers to resolve and handle the matter.  The farmers requested to the SIAMP team to incorporate the social structures (women water collection structures, structures for livestock drinking and abolition structures for the males) in the drawings and contract of the contractor.  The people are facing drinking water problem; therefore; they have requested to the SIAMP team to incorporate the water supply component in the project.  The Porali River is eroding fertile land and the farmers requested for incorporation of gabion works wherever; the river is eroding the fertile land. 58 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 59 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Figure 6.2: Agreement of Jamot Branch Farmers 60 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Table 6.4: List of Farmers Consulted Jamot Branch (Excluding 9th October,2015) Sr. No. Name of Participant Father's Name Tribe Village Name 1 Mitha Khan Siddiq Khaskheli Mitha Goth 2 Ghulam Muhammad Abdullah Mitha Goth 3 Muhammad Usman Muhammad Sharif Suleman Goth 4 Muhammad Khan Muhammad Hassan Chatta Jamot Goth 5 Muhammad Qasim Muhammad Musa Lakko Goth 6 Latif Shah Hassan Shah Jamot Chatta Goth 7 Muhammad Amin Muhammad Ghazoo Khaskheli Suleman Goth 6.5.3 Consultation with Farmers of Hingri & Nurg Weirs The farmers of Hingri and Nurg Weirs were briefed on village level about the objectives of the project during socio-economic baseline surveys. The farmer was briefed about the proposed engineering interventions on Hingri and Nurg. The farmers expressed willingness and requested for the provision of conveyance canal and protection to their land which are prone to frequent flood damage. Table 6.5: Consultation with the Communities and their Views at Hingri/Nurg Weirs Venue & Date Ferozani Goth 10th Sep, 2015 Location/Venue Gundacha BIWRMDP Mr. S.M Kakar Consultants Team Mr.Gulzar Khan Mr.Yasir Habib Members Mr.Ghlam Rasool Siapad Results/Outcome  The farmers expressed their willingness and cooperation with the project staff during survey and implementation of the project.  The farmers requested to the SIAMP team to incorporate the lining of irrigation canal in the proposed prject.  The people are facing drinking water problem; therefore; they have requested to the SIAMP team to incorporate the water supply component in the project.  The Porali River is eroding fertile land and the farmers requested for incorporation of gabion works wherever; the river is eroding the fertile land.  The flood blocks our accessing routes and houses.  Our uncultivated land will be cultivated when the water will be available after rehabilitating the Weirs. Table 6.6: List of Farmers Consulted on Hingri/Nurg Sr. Name of No.. Participant Father's Name Tribe Village Name 1 Nawaz Ali Wahid Jamot Ferozani Goth 2 Imam Bux Layyani 3 Azam Lakho Sia Charako Goth 4 Noor Muhammad Sharoo Roonja Achwani Goth 5 Nazir Ahmad Ghulamuddin Roonja Chibb Haji Saleh Muhammad Muhamad 6 Abdul Hakeem Roonja Chibb Wakeel Goth Hassan 7 Imam Bux Muhammad Siddiq Layyani Layyani Goth 8 Muhammad Ismail Muhammad Roonja Kechani Hussain 9 Abdul Jabbar Abdul Sattar Roonja Moani Goth 61 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Sr. Name of No.. Participant Father's Name Tribe Village Name 10 Iqbal Essa Roonja Nimmani Goth 11 Inayatullah Muhammad Roonja Musani Goth Hassan 12 Sanaullah Muhammad Omar Roonja Ishaqani Goth 13 Abdul Jabbar Sattar Moani Goth 14 Usman Abdul Qadir 15 Muhammad Haroon Isahaqani Goth 16 Ghulam Rasool Ishaqani Goth 17 Muhammad iqbal s/o Nimmani Goth 18 Essa Muhammad Khan Muhammad Nimmani goth 19 Imam bakhsh Hashim Loyani Goth 20 Abdul Hakeem Moosani Goth 6.5.4 Consultation with Farmers of Nimmi Sub-project At the first day of baseline survey commencement, a meeting was arranged with the farmers. The farmers were briefed about the objectives of the project and they were prepared for participation in walk through resettlement survey along the canal and cooperation in baseline data collection. At the end of the survey, In the first meeting, the farmers shown their willingness in participation and cooperation and in the second meeting, the farmers shared their views about the project and given in the following Table 6.7 and 6.8. Table 6.7: Consultation with the Communities and their Views at Nimmi Venue & Date 1. Meeting at Sher Muhammad Goth. 2. Meeting at Jano Goth 3. Meeting at Nimmi Bhent Goth 4. Meeting at Sour Dir Goth 5. Meeting at Kundi Goth 6. Meeting at Kishari Goth Location/Venue Above mentioned villages BIWRMDP Mr. S.M Kakar Consultants Team Mr.Gulzar Khan Mr.Yasir Habib Members Mr.Ghlam Rasool Siapad Results/Outcome  The farmers expressed their willingness and cooperation with the project staff during survey and implementation of the project.  They have expressed willingness to provide land if required voluntarily(without demanding any compensation) for completing the designed canal and other appurtenant structures.  They have also committed for not demanding or creating any problem in cutting of trees along the banks of canal, in case; if the cutting was unavoidable during construction phase.  They have confirmed that there is no residential, commercial, public or private structure within RoW of 8m of the existing irrigation canal.  The people are facing drinking water problem; therefore; they have requested to the SIAMP team to incorporate the water supply component in the project.  The Porali River is eroding fertile land and the farmers requested for incorporation of gabion works wherever; the river is eroding the fertile land.  They have raised the demand of providing a separate Weir for the Jamot branch and if the existing proposal of single Weir was followed; will create problem in future for water distribution and river sediment as full nutrients for their crops. 62 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP)  The farmers of Sher Muhammad Goth requested for provision of protection to their land situated on both sides of the proposed Weir.  Erosion due to intensed flood in the Porali River, most of the fertile land of Kundi, Kishari and Langra Goths are eroded. The communities requested for provision of protection to their land. Table 6.8: List of Farmers Consulted at Nimmi Sub-project in September, 2015 Sr. No. Name of Participant Father's Name Tribe Village Name 1 Burhanuddin Salahuddin Bizenjo Jani Goth 2 Sher Muhammad Mengal Usman Mengal Sher Muhammad 3 Ghulam Rasool Mir Goth Sher Muhammad 4 Muhammad Hashim Muhammad Qadir Bux Bizenjo Goth Nimmi Bhent 5 Abdullah (Councilar) Soomar Bizenjo Sour Dir 6 Muhammad Zahid Abdul Rasool Kundi (Jar Afzal 7 Wadera Mehmood Baloch Goth) Kishari 8 Muhammad Hamza Wali Jani Goth 9 Juma Khan Jani Goth 10 Muhammad Hassan Yar Sour Dir 11 Jan Muhammad Muhammad Sour Dir 12 Abdul Ghafoor kashyari 13 Muhammad iqbal kashyarui 14 Swali s/oWali muhammad Kashyari 63 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) PART-B NARI RIVER BASIN SUB-PROJECTS 64 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 7 EXISTING IRRIGATION SYSTEM ON NARI RIVER BASIN 7.1 Mode of Irrigation 7.1.1 Nari Gorge Sub-project There are two types of water resources i.e. surface and ground water. the situation of both resources are outlined as follows; A. Surface water Surface water in the Sub-project is the seasonal flow and floodwater of Anambar River which is currently not utilized by the farmers due to non-availability of a diversion structure. Duration of flood is around 20 days in the Kharif seasons (June to August) and in the Rabi season (December to March) the frequency and duration both are higher. Seasonal flow in the river is estimated 20 cubic ft/sec(0.57 m3/sec) at the time of visit which was utilized by few farmers through installing pumping units and irrigating the area located to the bank of the river while remaining seasonal and flood flow is not in use due to non-availability of diversion structure. B. Groundwater In 1990 the people start development of tube wells in the command area of sub-project area. There are 119 tube wells reported in the sub-project command area, and water quality is brackish. Lowering of water table is not reported because the area is in the monsoon range which supplements the groundwater and the other reason is load shading of power supply up to 22 hour/day in power-short season. 7.1.2 Yatabad Sub-project There are no existing irrigation practices on the proposed Yetabad Sub-project. 7.2 Water Rights 7.2.1 Water Rights&Distribution on Nari Gorge Sub-project All the farmers have rights to install the pump station on Anambar River (Nari) to lift the water to irrigate their land. At the time of visit there were about 35 pumping units installed and were functioning. While, the floodwater is utilized on a minor scale in the area and there is no existing water rights issue. During the investigation, the communities of the area were of the view that the water share should be based on land holding basis. Females also get the water shares in inheritance and they give their shares on lease to relatives or others. At the moment, the floodwater distribution is not practiced as there is no any diversion structure in the Sub-project area except at one location. 7.2.2 Water Rights& Distribution on Yatabad Sub-project At the moment, the floodwater distribution is not practiced as there is no diversion structure in the sub-project area except at one location. 7.2.3 No. of Water& Land Shareholders on Nari Gorge Sub-project The land is distributed among the farmers on sub-clan and further on individual family basis. It is registered in tehsil cadastral record on the name of Moza Sadat Shore, Moza Sahara Ismail Shore, Moza Karazat Ismail Shore and Moza Shadozai.Total land according to the 100% household surveys comes to 71471 acres (28936 ha). In which 21 families are landless out of 674 families. The current cropped area is 16092 acres (6515 ha). The largest land 65 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) ownership is 650 acres (263 ha) and smallest is 5 acres (2 ha). The average landholding is 106 acres (43 ha), which shows that there is an in-equity among the farmers on land distribution. Each clan has large size of communal land (Shamillat) which is not distributed yet due to shortage of irrigation water. Female also gets the land share in inheritance on Islamic law basis and they give their share on lease to the relatives or others. Selling of land is not reported by the community in the sub-project area. Table 7.1: No of Water & Land Shareholders No of Population Land owned Villages Tribes Clans Hose Total % Total % holds Saimani Qilla, Ismail Shore, Haleem Shore, Killi Gaman Shaar, Killi Din Mohammad, Killi Sado China and Killi Sahiar Shaar Tareen Musyani 274 3295 46.5 21315 29.8 Killi Tali Ustrani, Killi Alwand, Alaf Marjanzai, Ghazi China, New China, Sardar China, Killi Bahdur Khan, M Kala Khan and Niaz Mohammad Ustrani Ustrani 224 2238 31.6 26955 37.7 Killi Jahangir Shore Kakar Shadozai 119 950 13.4 16739 23.4 Tali Alaf, Killi Jalaludin and Manzaki Loni Loni Palaw 32 358 5.0 6100 8.5 Killi Abdul Rehman Buzdar Baloch Buzdar 14 110 1.6 230 0.3 Killi Ismail Share Sayed Syed 11 142 2.0 132 0.2 Total 674 7093 100 71471 100.0 7.2.4 No. of Water & Land Shareholders on Yatabad Sub-project The land is distributed among the farers on sub-clan and further on individual family basis. It is registered in tehsil cadastral record on the name of Moza Sadat Shore, Moza Sahara Ismail Shore, Moza Karazat Ismail Shore and Moza Shadozai.Total land according to the 100% household surveys comes to 71471 acres (28936 ha). In which 21 families are landless out of 674 families. The current cropped area is 16092 acres (6515 ha). The largest land ownership is 650 acres (263 ha) and smallest is 5 acres (2 ha). The average landholding is 106 acres (43 ha), which shows that there is an in-equity among the farmers on land distribution. Each clan has large size of communal land (Shamillat) which is not distributed yet due to shortage of irrigation water. Female also gets the land share in inheritance on Islamic law basis and they give their share on lease to the relatives or others. Selling of land is not reported by the community in the sub-project area. Table 7.2: No. of Water & Land Shareholders No of Population Land owned Villages Tribes Clans Hose Total % Total % holds Saimani Qilla, Ismail Shore, Haleem Shore, Killi Gaman Shaar, Killi Din Mohammad, Killi Sado China and Killi Sahiar Shaar Tareen Musyani 274 3295 46.5 21315 29.8 Killi Tali Ustrani, Killi Alwand, Alaf Marjanzai, Ghazi China, New China, Sardar China, Killi Bahdur Khan, M Kala Khan and Niaz Mohammad Ustrani Ustrani 224 2238 31.6 26955 37.7 Killi Jahangir Shore Kakar Shadozai 119 950 13.4 16739 23.4 Tali Alaf, Killi Jalaludin and Manzaki Loni Loni Palaw 32 358 5.0 6100 8.5 Killi Abdul Rehman Buzdar Baloch Buzdar 14 110 1.6 230 0.3 Killi Ismail Share Sayed Syed 11 142 2.0 132 0.2 100. Total 674 7093 100 71471 0 66 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 7.3 Communal Land 7.3.1 Communal Land on Nari GorgeSub-project More than 22% of the total area of the Schemes Package is used as rangeland and grazing rights belong to communities living around them. Due to communal ownership, usually these are accessible to all members of the community and also to nomads passing through the area on their traditional routes of migration to plain areas. There is no limit on the number, type, season and period/duration of grazing. This free access to range resource by everyone and absence of responsibility on management side has led to what could be termed as the “Tragedy of Commons”, which has resulted in overgrazing and uprooting of bushes/shrubs from rangelands beyond their carrying capacities. As a consequence, most of the rangelands in the area are being degraded. The overall rangeland productive capacity is up to the threshold of 160 kg /hectare. 7.3.2 Communal Land on Yatabad Sub-project Generally, all the cultivated land is distributed among the individual families and the land titles have been registered under the name ofMoza Sadat Shore, Moza Sahara Ismail Shore, Moza Karazat Ismail Shore and Moza Shadozai,Tehsil Duki and District Loralai with the Revenue Department Government of Baluchistan. As surveyed, in the original command of Yatabad. Each clan has large size of communal land (Shamillat) which is not distributed yet due to shortage of irrigation water. 7.4 Tenancy 7.4.1 Tenany on Nari GorgeSub-project The lands on which orchards of dates and orange are grown are predominantly owner operated and for home consumptions. All vegetable growers hire tenants for crops like vegetable, chillies, tomatoes, melons and wheat. Majority of the tenants are Baloch and other immigrated tribes who have settled in the area and make their livelihood through seasonal tenancy. Tenants are entitled for 1/5th of the harvest where 4/5rd goes to the landowner in perennial irrigation area. Tables 7.3-7.5 present the tenancy arrangements for Khushkaba farming, Sailaba farming and perennial irrigation commands in the Nari Gorge package of schemes. Table 7.3: Tenancy arrangements in Khushkaba farming of Nari Gorge package of Schemes Khushkaba Tenancy Arrangement Input Landlord (%) Tenant (%) Total Land 100 0 100 Water 0 0 0 Seed 0 100 100 Fertilizer 0 0 100 Chemicals 0 0 0 Main Output 33 66 100 By Product 33 66 100 Table 7.4: Tenancy arrangements in Sailaba farming of Nari Gorge package of Scheme Sailaba Tenancy Arrangement Input Landlord (%) Tenant (%) Total Land 100 0 100 Water 0 0 0 Seed 0 100 100 Fertilizer 0 0 100 Chemicals 0 0 0 67 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Main Output 33 66 100 By Product 33 66 100 Table 7.5: Tenancy arrangements in perennial irrigation of the Nari Gorge package of schemes Tenancy Arrangement: Tubewells/ Perennial water Input Landlord (%) Tenant (%) Total Land 100 0 100 Water 100 0 100 Seed 100 0 100 Fertilizer 100 0 100 Chemicals 100 0 100 Main Output 80 20 100 By Product 80 20 100 7.4.2 Tenancy on YatabadSub-project All vegetable growers hire tenants for crops like vegetable, chillies, tomatoes and wheat. Majority of the tenants are local resident and other immigrated tribes who have settled in the area and make their livelihood through seasonal tenancy. Tenants are entitled for 1/3rd of the harvest where 2/3rd goes to the landowner. Tables 7.6 and 7.7 present the tenancy arrangements for Khushkaba farming and perennial irrigation commands in the Sub-project. Table 7.6: Tenancy arrangements in Khushkaba farming of YatabadSub-project Khushkaba Tenancy Arrangement Input Landlord (%) Tenant (%) Total Land 100 0 100 Water 0 0 0 Seed 50 50 100 Fertilizer 50 50 100 Chemicals 0 0 0 Main Output 50 50 100 By Product 50 50 100 Table 7.7: Tenancy arrangements in tube wells irrigation of YatabadSub-project Tenancy Arrangement: Tube wells/ water Input Landlord (%) Tenant (%) Total Land 100 0 100 Water 100 0 100 Seed 100 0 100 Fertilizer 50 50 100 Chemicals 50 50 100 Main Output 66 33 100 By Product 66 33 100 7.5 Cropping Pattern The lands in Nari Gorge Sub-project area are fertile and farmers grow wheat and barley in Rabi vegetables and cotton during the Kharif season (April to November) and wheat, pulses, and vegetables during Rabi season (November to April). The most commonly grown crops are wheat and cotton. Wheat is growing by 100% and cotton 98.6% of the farmers, while fodder and vegetables growing are 83.5 and 14.4% in the area. Table 7.8: Cropping Pattern in the Project Area Crops Percentage Wheat/barley 100.0 68 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Cotton 98.6 Vegetables 14.4 Fodder 83.5 others (please specify) 0.0 While the common crops in theYatabad Sub-project area are wheat, pulses and fodder for livestock. 7.6 Operation & Maintenance At the moment there is hardly any O&M culture in the Sub-project area due to non-availability of any irrigation infrastructure or Sub-project. 7.7 Operation& Maintenance 7.7.1 O&M On Nari Gorge Sub-project The annual O&M is mostly cleaning/de-silting of main canal twice and once for the head work in a year for both the job 170 man days required which they contribute according to water shares bases in which Khajak provide 100, Luni 10, Dephal 30, Marghzani 10, and Kurak 20 labours. But after the flow division each tribe is responsible for their own section on bases of same labour contribution. However, the flood water of Bori and Arand Nullahhs are not in use due to non- availability of diversion structures and flood carrying canals. The flood water of both Nullahs are causes to damage their perennial water channels and standing crops every year in flood season. 7.7.2 O&M On YatabadSub-project At the moment there is no O&M on the sub-projectas there is not any existing irrigation infrastructure. 69 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 8 SCOIOECONOMICPROFILE AND BASELINE OF SUB- PROJECTS IN NARI RIVER BASIN 8.1 SOCIOECONOMIC PROFILE 8.1.1 Populationand Community Structure 8.1.1.1 Population& Community Structure on Nari Gorge Sub-project The family system in the Sub-project area is joint families 67.6%, and nuclear family systemsare 32.4% in the Nari Gorge package of schemes area. The details are given in the following Table 8.1; Table 8.1: Family Structure of Nari Gorge Sub-project Nuclear families (in %age) Joint families (in %age) 32.40% 67.60% The total population of Nari Gorge package of schemes is 5387, all belonging to the different sub-clans of Khajak, Dephal, Luni, Marghzani, Tareen, Safi and Rind tribes of Pashtun and Baloch. There are total of 539 households in the 9 villages, of which 55 households belong to Dephal and Rind Baloch which are located in Dephal village, 63 families of Baloch Rind are in Ghulam Bolak, 47 families of Barozai are in Kurak, 35 household of marghzani are in Marghzani village, 20 mizri families are in Mizri, 11 safi are in Safi village, 81of Luni tribe are in Luni village, 32 in Gulo Sher and all other 195 families of Khajak, Davi, Mohammadzai and Syed are in Khajak village. In addition to the land owner, about 1000 household resides as tenant in the project area. All households and particularly small water shareholders will benefit from the package of schemes development. The detail of tribe wise population is given in the following Table 8.2. Table 8.2: Tribe and Clan-wise Population Data of Nari GorgeScheme Population Land % age of % age Owned Tribe Clan Total of Total Male Female Total by Population Land Tribe Khajak Jafarzai 83 95 178 3.30 5288 7.17 Khajak Hameemzai 84 80 164 3.04 12599 17.08 Khajak Salihzai 34 41 75 1.39 400 0.54 Khajak Zaluzai 7 10 17 0.32 123 0.17 Khajak Kamalzai 22 27 49 0.91 322 0.44 Khajak Dolatzai 55 33 88 1.63 1501 2.03 Khajak Malezai 44 29 73 1.36 626 0.85 Khajak Mubarkzai 70 59 129 2.39 1131 1.53 Khajak Behramzai 137 96 233 4.33 3256 4.41 Khajak Omerzai 137 162 299 5.55 2285 3.10 Khajak Ishaqzai 157 118 275 5.10 4788 6.49 Khajak karyazai 57 37 94 1.74 1524 2.07 Dahapal RashidKhail 68 79 147 2.73 760 1.03 Dahapal Bilalzai 10 13 23 0.43 108 0.15 Dahapal Ayoubzai 53 62 115 2.13 700 0.95 Dahapal Sardarzai 37 37 74 1.37 200 0.27 Baloch Mengal 5 5 10 0.19 75 0.10 Baloch Bugti 3 5 8 0.15 8 0.01 Baloch Somro 26 23 49 0.91 42 0.06 Baloch Rind 419 387 806 14.96 8240 11.17 Baloch Marri 96 96 192 3.56 2801 3.80 70 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Population Land % age of % age Owned Tribe Clan Total of Total Male Female Total by Population Land Tribe Baloch Kohsa 7 10 17 0.32 80 0.11 Safi kamalzai 34 51 85 1.58 1430 1.94 Safi Anazai 71 52 123 2.28 730 0.99 Marghzani Shudanzai 178 192 370 6.87 2247 3.05 Marghzani KhanKhail 38 39 77 1.43 2760 3.74 Tareen Nodani 192 198 390 7.24 1856 2.52 Luni Nakazai 42 53 95 1.76 100 0.14 Luni Shadozai 197 214 411 7.63 4150 5.62 Luni Sakizai 37 40 77 1.43 82 0.11 Luni Pathozai 11 6 17 0.32 30 0.04 Kurak Barozai 55 53 108 2.00 6846 9.28 Kurak lalozai 67 80 147 2.73 2252 3.05 Kurak Mehmoodzai 37 34 71 1.32 1178 1.60 Kurak Khail Band 21 32 53 0.98 608 0.82 Kansi Kansi 7 9 16 0.30 720 0.98 Mizri Kar Khail 82 71 153 2.84 1010 1.37 Syed Bukhari 25 20 45 0.84 428 0.58 Mohmmadzai Mohmmadzai 15 19 34 0.63 500 0.68 Total 2720 2667 5387 100.00 73784 100.00 The household details and total population is presented in Appendex-E. 8.1.1.2 Population & Community Structure on Yatabad Sub-project Total households of sub-project are 674 with a total population of 7093 in which 3305 male and 3788 are female. The family structure of the Sub-project area is joint families 74.01%, single families are 25.98%. Table 8.3: Population & Community Structure Family System Single 25.98% Joint 74.01% Total population of Yatabad is 7,093, all belonging to the Musyani sub-clans of Tareen, Shadozai of Kakar, Loni and Ustrani, tribes of Pashtun and Buzdar of Baloch are dwelling in the Sub-project area. Total households are 674 in the 22 villages. Pashto is the main language in the Sub-project area though most men can also speak Urdu and Saraiki. All, except 21 households, own irrigated land and have water rights in the Sub-project’s area. All households and particularly small water shareholders will benefit from Sub-project. The details of tribe wise population and land holding percentage is given in Table 8.4. Table 8.4: Tribe and clan-wise population data of Yatabad integrated Sub-project No. of Population Land owned Hose- Villages Tribes Clans holds Total % Total % Saimani Qilla, Ismail Shore, Haleem Shore, Killi Gaman Shaar, Killi Din Mohammad, Killi Sado China and Killi Sahiar Shaar Tareen Musyani 274 3295 46.5 21315 29.8 Killi Tali Ustrani, Killi Alwand, Alaf Marjanzai, Ghazi China, New China, Sardar China, Killi Bahdur Khan, M Kala Khan and Niaz Mohammad Ustrani Ustrani 224 2238 31.6 26955 37.7 Killi Jahangir Shore Kakar Shadozai 119 950 13.4 16739 23.4 71 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Tali Alaf, Killi Jalaludin and Manzaki Loni Loni Palaw 32 358 5.0 6100 8.5 Killi Abdul Rehman Buzdar Baloch Buzdar 14 110 1.6 230 0.3 Killi Ismail Share Sayed Syed 11 142 2.0 132 0.2 100. Total 674 7093 100 71471 0 The household details and total population is presented in Appendex-F. 8.1.2 Village Type Type of construction of the houses in the Nari Gorge sub-project area are made pucca 23.7%, semi pucca 57.6 and kacha are 18.7%. The details of housing structure are given in Table 8.5. There are minimum 1 room and maximum of 29 rooms with an average of 10 rooms per house. All houses usually have a boundary wall enclosing enough space for cattle and storage. Table 8.5: Village Type in Nari Gorge Sub-project Type of House %age Pucca 23.7 Semi pucca 57.6 Katcha 18.7 Wood 0.0 others (please specify) 0.0 While in the Yatabad Sub-project area, all the houses are made of mud and roofs are also with mud. The details of housing structure are given in Table 8.6. There are minimum 2 rooms and maximum of 50 rooms with an average of 5 rooms per house. All mud houses usually have a boundary wall enclosing enough space for cattle and storage. Table 8.6: Village Type in Yatabad Integrated Sub-project Sub- Households having Amenities Percent Parameters Criteria project Households Average Minimum Maximum Average made of mud 98 made of Walls 1 brick/cement made of brick 1 made of mud 98 Roofs made of Tile/metal 1 5 5 2 30 made of Tile 1 Shutter 95 Windows Glass 2 None 2 Electricity Having connection 100 8.1.3 Languages Pashto, Sindhi and Balochi are the main languages in the Narai Gorge sub-projecct area though most men and women can also speak Urdu. In case of Yatabad sub-project area, Pashto, Brahvi and Urdu are the languages spoken. The Pashto language is the dominant language spoken in the project area 100 percent of the population speaks. 72 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 8.1.4 Religion During the socio-economic field survey it was observed that about 100 percent of the population is Muslim. 8.1.5 SocialInfrastructures in the Area The area of Nari Gorge sub-projects’ mostly villages are connected with the National Highway through a village link road. The result of the survey revealed that there was natural gas, appropriate road. Primary level education facilities were minimal keeping in view the population size in the project area. There is one Rural Health Center (RHC), and 3 dispensaries within the scheme area and all are functional. And no sewerage/drainage facilities as well as no landline telephone facility are reported by the respondents in the project area. The project area of Yatabads mostly villages are is connected with the National highway through a village link road. The result of the survey revealed that there was nonatural gas, appropriate road. Primary level education facilities were minimal keeping in view the population size in the project area. There is one Rural Health Center (RHC), and a dispensary within the scheme area and both are functional. And no sewerage/drainage facilities as well as no landline telephone facility are reported by the respondents in the project area. 8.1.6 Education Facilities The detail of available education facilities for male and female in the Nari Gorge sub-project area is given in the following Table 8.7. Table 8.7: Education Facilities in Nari Gorge Package of Schemes School Gender Village Name Primary Middle High Collage Luni 0 0 1 0 Khajak 4 0 1 0 Boys Kurak 1 0 0 0 Dephal 0 1 0 0 Marghzani 7 0 1 0 Luni 1 0 1 0 Khajak 3 0 1 0 Girls Kurak 1 0 0 0 Dephal 0 0 1 0 Marghzani 7 1 0 0 Quality of education and infrastructures are fair as reported by the communities. Boys and girls collages are at a distance of 10 km in Sibi town. There is one Boy’s High School, 14 primary schools for boys and 12 primary schools for girls which are functional in Yatabad integrated scheme area in which there are 16 teachers for high school, 40 for all primary schools, in which approximately 1500 enrolment of boys and girls reported. Quality of education and infrastructures are fair as reported by the communities. Boys and Girls collages are at a distance of 21 km in Duki town. 73 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 8.1.7 Health Facilities There is one Rural Health Center (RHC), three Basic Health Units (BHUs) and a dispensary within the sub-project’s area and all are functional. Lady Health Workers are available only in Luni village, while the serious patients are taken for treatment to Sibi district hospital which is 10 kms away from the Sub-project. Table 8.8: Education Facilities in Nari Gorge Package of Schemes Health Facilities Rural Basic Name of Homeopathic Health Health Dispensary Midwifery Medical Store Village Clinic Center Unit Luni 1 0 0 0 1 0 Khajak 0 1 0 0 0 0 Kurak 0 0 1 0 0 1 Dephal 0 1 0 0 0 0 Marghzani 0 1 0 0 0 0 Total 1 3 1 0 1 1 Only Rural Health Centre (RHC) is located in the Yatabad Sub-project area for general treatment. The RHC is functional as stated by the women community. Lady health worker is also available. Health coverage seems reasonable for the routine treatments. 8.1.8 Drinking Water In the villages of the Nari Gorge Sub-project area, water supply schemes are developed by PHE Department with networking and all are functional. The O&M of these schemes are responsibility of PHE department. The other source of drinking water is channel water. About 84% households have their own piped water system at home in the Yatabad Sub-project area. While around 16% household fetch water from channels and tube wells. Only 34% of women make water safer for drinking by boiling. Around 91% women and 57% children respectively go outside their homes for fetching of water for domestic uses. 8.1.9 Transport The scheme is located about 11 km from Sibi district head quarter. Local transport is available in the scheme area. The community travel to district head quarter town in mini buses and pickups mostly used the motor-bikes and rickshaws. Link roads of mostly villages up to Sibi are black top and are in good condition. Table 8.9 shows the transport data of Nari Gorge scheme area. Table 8.9: Transport facilities of Nari Gorge Sub-project Transport Facility from Village to Nearby Town Name of Village Van/pickup Bus Car Other Luni 1 1 0 Rikshwa Khajak 1 1 0 M.bike Kurak 1 1 0 M.bike Motor Dephal 0 0 0 bike/Rikshwa Marghzani 1 0 0 MotorBike 74 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) The scheme is located about 80 km from Loralai on Loralai to Duki road. Local transport is available in the scheme area. The community owns 50 private cars, 15 pickups and fair number of motor bikes. Public buses are also operating from Nana Sahib Ziarat towards Loralai and Duki. Link roads of mostly villages up to highway are black top and are in good condition. Table 8.10 shows the transport data of Yatabad scheme. Table 8.10: Transport Ownership of Yatabad scheme % Households Average at Households having Assets Type having one or more Scheme Level Average Min Max Bicycle 10 0 1 1 3 Motor Cycle 53 1 1 1 5 Tractor 18 0 1 1 4 Truck 1 0 4 4 4 Cars/Pickups 9 0 1 1 5 8.1.10 NGOs Working in the Area During the field survey in the Nari Gorge Sub-project area it is reported that only Luni village, one NGO, is working in the Agriculture area while in the case of Yatabad Sub-project, no NGO was reported being working in the area 8.1.11 Floods Impacts During the survey in the Nari Gorge Sub-project area, only in Luni and Khajak villages flood impacts are reported in monsoon season, the Bori and Arand flood Nullahs are damaging water channels, standing crops, livestock, livelihoods and infrastructure damages reported. in the Yatabad Sub-project area, only in 2 villages Killi Buzdar and Ghazi China the loss of houses, crops, livestock, livelihoods and infrastructure damage are reported due to floods. 8.1.12 Community Awareness about Project The social baseline survey reveals that 100% awareness about the project was reported in bothsub-projectareas while 100% were not aware about the implementation of the project. 8.2 SOCIOECONOMIC BASELINE OF NARI RIVER BASIN 8.2.1 Methodology A survey of 5 villages within the command area of Nari Gorge Sub-project was conducted from the 30thSeptemebr,2015 to 9thSeptember, 2015 in order to establish a social baseline of the project area. A survey of 15 villages within the command area of Yatabad sub-project area based on each banch canal was conducted from the 5thSeptemebr,2015 to 15thSeptember, 2015 in order to establish a social baseline of the project area. All villages lying within the command area of the proposed project and were having legal entitlement of the land and water share were included within the social survey. The questionnaires used during the study are provided in Annexure-B. The information gained will assist in the measurement and determination of the impacts (positive and negative) on social services, livelihood and cultural pattern of the population under study. To make the analysis more compelling, qualitative data through focus group discussions (FGDs) was also collected. 75 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 8.2.2 Basic Information of Respondent 8.2.2.1 Age of Respondents The respondents for the socio-economic baseline survey are classified in accordance to the following age groups as detailed in the Table 8.11. The survey reveals that 4.5 of the respondent’s age was 21-30 years,27.8% respondent’s age was 31-40, 40.2% of the respondent’s age was 41-50,16.2% of the respondent’s age was 51-60,9.0% of the respondent’s age was between 61-70 and 2.3% age was above to 71 years. Table 8.11: Age of the Respondents Responds’ Age %age < 20 0.0 21- 30 4.5 31- 40 27.8 41 – 50 40.2 51 – 60 16.2 61 – 70 9.0 > 71 2.3 8.2.2.2 Respondent’s Relationship with Head of Household In both Sub-project areas, the 100% of the respondents were personally available for interview. 8.2.2.3 Gender of the Respondents The socio-economic baseline survey results indicate that 100% of the respondents were male. 8.2.2.4 Tribal Representation in the Baseline Survey The result of the baseline survey portrayed in the following Table 8.12 and indicates the tribal representation as Luni 12.9%, Barozai 8.6, Safi 6.5, Marghzani 6.5, Mizri 3.6, Khajak 34.5, Rind 16.5 and Dephal 10.8%. Table 8.12: Tribal Representation in Nari Gorge Sub-project Area Tribe/Clan No. of Respondents %age Barozai 12 8.6 Luni 18 12.9 Saffi 9 6.5 Margazani 9 6.5 Mizri 5 3.6 Khajjak 48 34.5 Rind 23 16.5 Dephal 15 10.8 In Yatabad sub-project area the tribal representation was as Luni 23.3%, Shadozai17.8%, Sayed 16.4%, Ustrani4.1%,and Tareen38.4%. The details are given in the following Table 8.13. Table 8.13: Tribal Representation in Yatabad Sub-project Area Tribe No. of Respondents %age Luni 17 23.3 76 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Shadozai 13 17.8 Sayed 12 16.4 Ustranai 3 4.1 Tareen 28 38.4 Total 73 100 8.2.2.5 Education Level of the Respondents The socio-economic baseline survey reveals that 24.8% of the respondents were illiterate, just over 10.5% of the respondent’s education level was primary, 16.5% respondent’s education level was Secondary, 10.2% of the respondents education level was high up to 12 years and 52.3% respondent’s education level was of university level. The details are illustrated in the following Table 8.14. Table 8.14: Education Level No Education 24.8 Primary (up to 5 Years) 10.5 Secondary (up to 10 years) 16.5 High School (up to 12 Years) 10.2 University 52.3 Others 0.0 8.2.2.6 Settlement of the Respondents There is no migrated/settlers of other parts of the province and 100% of the respondents were local of the project area. 8.2.3 Demography 8.2.3.1 Family Size The survey data in the Table 8.15 below reveals that the average family size 1-5 is 11.3%, 5- 10 is 59.0%, and 10-15 is 24.8% whereas above 15 is 4.9% in the project area. Table 8.15: Average Family Size Family Size %age 1 to 5 11.3 5 to 10 59.0 10 to 15 24.8 15 & above 4.9 8.2.4 Village Amenities There are no land line telephone connections while mobile network exist in the whole project area. All the houses are connected with National grid for electricity supply for domestic as well as agriculture use. Natural gas is also provided to all the project area accept Marghzani village.For the sewerage system the peoples of Dephal were demanding.. 8.2.5 Fuel Resources All the villages of the Nari Gorge Sub-project area are connected with Natural Gas excluding Marghzani which is not yet connected. As reported in the baseline, averagely Rs.1,863 of fuel wood/LPGcost are utilized per month in both seasons winter and summer. The rate of fuel 77 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) wood is Rs.300/mond and LPG is Rs.130/kg in the area. The sub-project wise details are given in the following Tables 8.15 and 8.17. Table 8.16: Fuel Resources in the Marghzani village of Project Area Energy Resources in Marghzani Village/Month Family Fuel Wood(Mon) LPG(Kg) S.No. Size Winter Summer Winter Summer Average/month 1 10 11 6 12 7 9 2 14 15 8 16 9 12 3 13 13 7 14 8 10.5 4 6 7 4 6 4 5.25 5 9 9 5 10 7 7.75 6 9 9 5 10 7 7.75 7 16 15 8 16 9 12 8 15 14 7 16 9 11.5 9 7 7 4 8 5 6 10 8 8 5 9 6 7 11 4 4 2 6 4 4 12 15 14 7 16 9 11.5 13 10 11 6 12 7 9 14 15 14 7 16 9 11.5 Total 151 81 167 100 124.75 Rate 300 300 130 130 215 Amount 45300 24300 21710 13000 26077.5 Average Quantity 11 6 12 7 9 Average Amount(Rs) 3236 1736 1551 929 1863 Table 8.17: Fuel Resources in Yatabad Sub-project Area Fuel wood/energy requirement for Winter and Summer Sr.No Winter Summer LPG LPG . Village Name Average Wood Wood Winter Summer Total Average Quantity(Mon) 3 2 1 0 1 Shera Shar Average Amount(Rs) 892 492 83 52 1520 Average Quantity(Mon) 3 2 1 0 2 Killi Abdullah Average Amount(Rs) 775 463 81 49 1368 Average Quantity(Mon) 2 2 1 1 3 Adwani Killi Average Amount(Rs) 700 493 111 71 1375 Average Quantity(Mon) 4 2 1 1 4 Jahangir Shar Average Amount(Rs) 1175 625 146 87 2033 Average Quantity(Mon) 2 2 1 1 5 Sado China Average Amount(Rs) 733 475 119 76 1403 Average Quantity(Mon) 2 1 1 1 6 Haleem Shar Average Amount(Rs) 717 406 147 87 1356 78 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Fuel wood/energy requirement for Winter and Summer Sr.No Winter Summer LPG LPG . Village Name Average Wood Wood Winter Summer Total Average Quantity(Mon) 3 2 1 1 7 Semani Qila Average Amount(Rs) 923 500 138 82 1643 Average Manzaki/Bash Quantity(Mon) 3 1 1 1 8 arat Manzaki Average Amount(Rs) 770 410 143 87 1410 Average Qila Din Quantity(Mon) 2 1 1 1 9 Muhammad Average Amount(Rs) 681 404 140 83 1308 Average Quantity(Mon) 2 1 1 1 10 Khudani Killi Average Amount(Rs) 545 370 134 85 1134 Average Quantity(Mon) 1 1 1 0 11 Gaman Shar Average Amount(Rs) 418 225 108 62 813 Average Buzdar / Quantity(Mon) 2 1 1 1 12 Kehtran Average Amount(Rs) 538 306 125 70 1039 Average Quantity(Mon) 3 2 1 1 13 Manki Killi Average Amount(Rs) 783 517 144 79 1524 Average Quantity(Mon) 5 3 2 1 14 Sardar Shar Average Amount(Rs) 1450 950 234 191 2825 Average Quantity(Mon) 2 2 1 1 15 Killi Asad Ullah Average Amount(Rs) 500 450 173 95 1219 Average Cost/Month 773 472 135 84 1465 8.2.6 Family System In urban areas, the nuclear family system is preferred to a joint family system in Sibi and Quetta, where people are residing for professional reasons. Having limited income they prefer to live independently, whereas in the rural areas, the majority of the people live in joint families. The eldest male member takes care of all the family members and his decision is usually considered final in family affairs. In rural areas, nuclear families are very rare; however, the trend for nuclear family is rising in urban areas. The family institution is very important, as it provides social security during un-employment and financial crisis. It also plays an important role in social interaction and conflicts. The following table reveals that about 64.7% of those in the study area live together with their extended family (parents living with married children and their families). Families believe this is a more economical way of living as they often work together on the same land and are able to share their joint incomes to support the entire family, including elderly relatives who are unable to work. About 35.3% of the population is living in nuclear family system. Table 8.18: Family System in the Project Area 79 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Family System Single 64.7 Joint 35.3 8.2.7 Marriage During the base line survey 10.9% of the respondents reported the marriages in the project area outside the family and 89.1% of the marriages were reported within family. The details are given in the baseline survey Table 8.19. Table 8.19: Marriage System in the Nari-Gorge Sub-project Area Marriage Pattern %age Outside the family marriage 10.9 Inside the family marriage 89.1 8.2.8 Disease During baseline survey, 63.5% of the respondents reported illness during the last one year in their families and 36.5% of the respondents have not reported any illness in their families. Table 8.20: Illness reported during last 1 Year Illness during Last 1 Year %age Yes 63.5 No 36.5 8.2.9 Treatment Places The survey for Nari Gorge sub-project area indicates that the average7.2 patients were taken to the nearby town Sibi; while 1.2 and 0.4 patients were taken to Quetta and Karachi respectively for treatment. Table 8.21: Treatment Place in Nari Gorge Sub-project Area Treatment Place Average Sibi 7.2 Quetta 1.2 Karachi 0.4 Others 0.0 The survey for Yatabad Sub-project indicates that the 87.4% patients were taken to the nearby town; Duki while 1.6%, 7.1% and 3.9% patients were taken to Loralai, Quetta and Multan respectively for treatment. Table 8.22: Treatment Place in Yatabad Sub-project Area Treatment Place %age Duki 87.4 Loralai 1.6 Quetta 7.1 Multan 3.9 80 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 8.2.10 Birth Rate The socioeconomic baseline survey conducted for the project indicates that the average birth rate/village during the period of last one year was reported 0.51. 8.2.11 Death Causes As per socio-economic baseline survey for the project area is 0.086 per year and the causes of death 39.13% were due to heart attack, 8.70 were from sugar, 13.04% from hepatitis and 26.09 are from other diseases. Table 8.23: Causes of Death Heart Attack 39.13 Sugar 8.70 Hepatitis 13.04 Others 26.09 8.2.12 Money Lending As reported during the baseline, borrowing of money for agriculture purposes is not common in the project area. 8.2.13 Visit to Nearest City The baseline survey indicates 40.2% of the responsible family members areas visiting the nearest city for meeting with relatives, 25.9% are visiting for business, 28.6% are visiting for educational purposes and 5.6% for getting health services. The details are given in the following Table 8.24 as follows. Table 8.24: Purpose of the Visit to nearest City Purpose of Visit %age Family/relations 40.2 Market/business/trade 25.9 Educational 28.6 Health 5.3 8.2.14 Community Priority Needs During public consultation and baseline survey on Nari Gorge Sub-project, the needs of the communities were assessed. The baseline reveals that sewerage system is thetop priority of the 96.4% and Natural Gas is the second priority of onlyMarghzani village. The needs of the communities on Yatabad Sub-project were pure drinking wateras top priority of the 96.06% and roads were the second priority of the people. 8.2.15 Livestock 8.2.15.1 No. of Livestock The average number and type of livestock owned in Nari Gorge sub-project area is given in the following Table 8.25. 81 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Table 8.25: Average No.& Type of Livestock Ownership in the Nari Gorge Sub-project Area Livestock Ownership Average/Village No. of Buffalows 16.2 No. of cows 56 No. of Goats 286 No. of sheep 0 No. of oxen 0 No. of calves 0 No. of donkeys 5.4 No. of horses 0 No. of chiken 233 The average number and type of livestock owned in Yatabad sub-project area is given in the following Table 8.26. Table 8.26: Average No.& Type of Livestock Ownership in the Yatabad Sub-project Area Livestock Average Ownership No. of Buffalows 1 No. of Cows 8 No. of Goats 38 No. of Sheep 96 No. of Oxen 0 No. of Calves 0 No. of Donkeys 2 No. of Horses 0 No. of Chiken 25 8.2.15.2 Value of Livestock During baseline survey, variations information pertinent to the values of the livestock was obtained and analyzed. The average value of the livestock most frequently exist in the area is given in the following Table 8.27. Table 8.27: Average values Type of Livestock in the Nari Gorge Sub-project Area Name of Livestock Average Value Buffalows 95,000 Cows 69000 Goats 7200 Sheeps 0 Oxen 0 Donkeys 12300 Chiken 340 During baseline survey, variations information pertinent to the values of the livestock was obtained and analyzed. The average value of the livestock most frequently exist in the area is given in the following Table 8.28. 82 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Table 8.28: Average No & Type of Livestock Ownership in the Yatabad Sub- Project Area Name of Animal Average Value Buffalows 85000 Cows 65000 Goats 7000 Sheeps 7000 Oxen 150000 Donkeys 15000 Chiken 400 8.2.15.3 Source of Fodder The farmers are grazing their herds in nearest rangeland and fodders are cultivated in the agriculture land for livestock. The farmers are not purchasing fodder for livestock from out sources. 8.2.16 Livelihood& Income The baseline survey indicates that the agriculture in the primary sources of income, livestock as secondary source and Govt Jobs/PrivateJobs as tertiary source of income. While very few farmers are doings business. 8.2.16.1 Family Members Involvement in Livelihood Earning The family members involved in the livelihood earning are 100 male and their age between 16-65 years. 8.2.17 Anticipated Losses due to Project None of the below mentioned losses due to the proposed project development is anticipated. Table 8.29: Anticipate Losses due to Project Anticipated Loss Results Loss of residence No Loss of cultivated land No loss of trees No Loss of livelihood No Loss of other infrastructure No Loss of uncultivated land No 8.2.18 Housing The baseline survey of the water and land shareholder in the command area of the proposed project indicates that 100% of the houses are owned by the communities and there is no farmer who is residing in rented or free home. 8.2.18.1 No. of Rooms The numbers of rooms owned by the target communities in the project area 1-5 are 23.7% and 5-10 are 75.6%. The details are given in the following Table 8.30. 83 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Table 8.30: Ownership of Rooms in Project Area Room Ownership %age of Ownership 1 to 5 23.7 5 to 10 75.6 10 & above 0.0 8.2.18.2 Bathrooms in both Sub-project areas, 100% houses having of bathrooms (open area surrounded by boundary walls) owned by the target communities in the project area. 8.2.18.3 Plot Size The baseline survey reveals that the plot size in the project area between 2500ft. to 3500ft. 6.5%, 3600ft. to 5000ft. are46.8% and above 5000ft. are46.8%. The results are displayed in the following Table 8.31. Table 8.31: Plot Size in the Nari Gorge Sub-project Area Plot Size in Sq. ft. (Approximately) %age 2500 to 3500 6.5 3600 to 5000 46.8 5000 & Above 46.8 The baseline survey in Yatabad sub-project area reveals that the plot size in the project area is between 2500ft. to 3500ft. 7.9%, 3600ft. to 5000ft. are46.5% and above 5000ft are45.7%. The results are displayed in the following Table 10.22. Table 8.32: Plot Size in the Yatabad Sub-project Area Plot Size in Sq. ft. (Approximately) %age 2500 to 3500 7.9 3600 to 5000 46.5 5000 & Above 45.7 8.2.18.4 Rooms for Livestock During the baseline survey, 100% farmers reported the special rooms for animals. However; some of the farmers have constructed animal sheds near to their houses. 8.2.19 Landholding& Use The current land use during the surveys of the proposed sub-project is presented in Table 8.33. Table 8.33: Land use systems of Nari GorgeSub-project Type of Land Land Size – acres (ha) Current Cropped Area – acres (ha) Sailaba 1214 (492) 540 (219) Khushkaba 26327 (10659) 2217 (898) Perennial 44065 (17840) 17266 (6990) Ground Water 2178 (882) 1269 (514) Total 73784 (29872) 21292 (8620) The current land use at the sub-project is during the surveys of the proposed Yatabad Sub- project is presented in Table 8.34. 84 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Table 8.34: Land use systems of YatabadSub-project Type of Land Land Size Current cropped area – acres (ha) Sailaba 11235 4700 (1903) Khushkaba 51962 8977 (3634) Seasonal/pumping units 350 350 (142) Ground Water 7924 2065 (836) Total 71471 16092 (6515) Total agricultural area of the Yatabad Sub-project is 71471 acres (28936 ha) out of which 16092 acres (6515 ha) are presently cultivated while remaining 55379 acres (22421 ha) are lying fallow due to water scarcity. 8.2.19.1 Nature of Farming The land tenure in the project area is 47.7% owner operated, 52.3% owner cum tenant operated and 47.7% is cultivated by sharecroppers. The details are given in the Table 8.35. Table 8.35: Land use systems of YatabadSub-project Owner 47.7 Contract 0.0 Owner cum tenant 52.3 Share cropping 47.7 Others 0.0 8.2.19.2 Sale & Purchase of Land The baseline survey indicates that sale and purchase of the land is not common in the area. The sale and purchase of land is transferred in the Revenue record. 8.2.20 Agriculture Implements The individual ownership of agriculture implements is shown in Table 8.36. Table 8.36: Type of Agriculture Tools and Machinary Owned by Farmers in th Project Area Type Ownership in %age Plough for oxen 0.09 Plough for tractor 0.58 Tractor 0.21 Spray machine 0.43 Trolley for tractor 0.08 Thresher 0.88 Others 0.00 8.2.21 Agriculture Inputs The average agriculture expenses per year as reported during the socio-economic baseline survey on Nari Gorge Sub-projectthe average cost per acre of seeds, fertilizers, pesticides, plowing and harvesting are Rs.25500. The detail is in the following Table 8.37. 85 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Table 8.37: Estimated Expenses per Year/ Acre on Nari Gorge Sub-project Area Village Acres Expenses/Acre Total Expenses Dephal 403 2500 10276500 Khajak 956 2500 24378000 Marghzani 188 2500 4794000 Luni 424 2500 10812000 Kurak 492 2500 12546000 Total 2463 2500 62806500 The average agriculture expenses per year as reported during the socioeconomic baseline survey at Yatabad sub-project area are the average cost per acre of seeds, fertilizers, pesticides, plowing and harvesting are Rs.31553. The detail is in the following Table 8.38. Table 8.38: Estimated Expenses Per Year/ Acre in Yatabad Sub-project Area Sr. Total Total Village Name No. Acres Expenses/Acre Total Expenses 1 Shera Shahar 332 31,700 10,524,400 2 Killi Abdullah 72 31,700 2,282,400 3 Adwani killi 143 31,700 4,533,100 4 Jahangeer Shahar 175 31,700 5,547,500 5 Sado China 124 31,500 3,906,000 6 Haleem Shahar 195 31,500 6,142,500 7 Semani Qilla 214 31,500 6,741,000 8 Manzaki/basharat Manzaki 165 31,500 5,197,500 9 Qilla Din Mohammad 539 31,500 16,978,500 10 Khudani killi 224 31,500 7,056,000 11 Gaman shahar 379 31,500 11,938,500 12 Buzdar killi 160 31,500 5,040,000 13 Manki Killi 114 31,500 3,591,000 14 Sardar Shahar 237 31,500 7,465,500 15 Killi Asadullah 370 31,500 11,655,000 Total 3443 31,553 108,598,900 8.2.22 Seasonal Earnings During the baseline survey, the following average seasonal earnings in rupees per acre were reported in the Nari and Yatabad Sub-projectareas are given in the Table 8.39 and 8.40. Table 8.39: AverageSeasonal Earnings/acre in Nari Gorge Sub- Project Area Season Average Seasonal Earning/Acre (in PKR) Rabi 40000 Kharif 25000 Table 8.40: AverageSeasonal Earnings/acre in Yatabad Sub-project Area Season Average Seasonal Earning/Acre (in PKR) Rabi 45000 Kharif 58500 86 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 8.2.23 Trees on Nari Gorge Sub-project There are two kind of forest trees localy called Keeker and Kandi naturally grown along the Marghzani, Khajak and Luni channels. The Keeker is further two kinds one is called Mulki Keeker which is a big tree the other is Biskoot Keeker not fully grown and looks like wild bushes. Number of these trees along Marghzani channel Mulki Keeker 130, Kandi 120, along Khajak Subzreg Nullah Kandi 1800 large size around 2000 small size Kandi and along Luni channel Kandi 900, Mulki Keeker 1200 observed. Along the Dephal and Kurak channel no any tree were observed. All these trees along the channels are in 20ft distence of both side and no one is owner of these trees. The estimated details and on each canal is given in the Table 8.41. Table 8.41: Branch wise number of Trees on Nari Gorge Sub-project Area No. and Kind of Trees Name of Canal Kandi Keeker Mulki Keker Biskoot Khajak 3800 0 500 Luni 900 1200 0 Dephal 0 0 0 Kurak 0 0 0 Marghzani 120 130 0 Total 4820 1330 500 8.2.24 Trees on Yatabad Sub-project Muskat (keekar) trees are naturally grown and spreaded on the major alignment of the main canal and branches of the proposed conveyance system. The farmer of the project area usually chopped these trees every year and used as wood fuel which also enables them to have clear land for cultivation. These keekar trees are not fully grown and look like wild bushes. Around 18148 trees of Muskat (keekar) were observed and recorded along the length of the main flood carrying canal of the yatabad FIS. Similarly; 5551, 4071, 3700, 4811 and 4441 trees were observed and recorded along the length of the porposed branch flood carrying canals namely Manzaki, Basharat Manzaki, Jahangeer Shore, Mankai, and Jat Abad respectively. The exact number of trees likely to be cut down cannot be confirmed at this stagebecaue the exact alignment can only be finalized when the contractor is on boardThe Contractor will make efforts to avoid trees cutting. The Contractor will mark those trees and prepare tree inventories which are unavoidable during joint walk through survey with the PMU and PIC. At the implementation phase, the cut down tress shall be handed over to the farmers who are owner of the trees. The RD wise estimated details and owner ship is given in the Table 8.42. Table 8.42: Tree Inventory on Yatabad Sub-project Branch Name No. of Trees Main FFC 18148 Mazakai 5551 basharath Manzaiki 4071 Jahangir shore 3700 Mankai 4811 Jat Ababd 4441 Total 40721 8.2.25 Commercial Assets There are no commercial assets within RoW of the proposed sub-project likely to be affected. 87 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 9 SOCIAL IMPACTS& MITIGATION PLANNING IN NARI RIVER BASIN 9.1 Land Acquisition for Nari Gorge Sub-project The impact assessment for the identified Year One schemes in Nari River Basin is based on current engineering design. This engineering design gives an approximate footprint on the ground and maps out the maximum area of land needs for the schemes. This alignment will be reviewed and further optimized by the contractors once they are engaged and mobilized before they finalize the alignment through the development of construction drawings and demarcate the alignment on the ground. Impact minimization is a major consideration in the contractors’ finalization of the alignment in further consultations with the communities. Only then the contractors will demarcate the alignment on the gorund and the scheme impacts of lands and trees will be final. The branch and structure wise status of land need given here is based on the current engineering design and gives the maximum extent of possible impact, and does not reflect the final impacts. in the following sectio  Nari Gorge Sub-project Currently there is a diversion structure on main Nari River. The farmers of Nari Gorge Sub- project areusing its flow of 120 cusecs since their fore-fathers’ time The SIAMP team have conducted walk through survey along the length of the proposed rehabilitation and new canals jointly with the farmers. The resettlement and land acquisition survey was conducted in the RoW (as design decided) as the resettlement and land acquisition questionnaires were envisaged; there were no public, private, residential and commercial structures. 9.1.1 Tree Inventory During walk through survey along the proposed irrigation canals, total 6650trees of Kandi and keekers were observed and recorded along the length of the eacharepresented earlier. The exact number of trees likely to be cut down cannot be confirmed at this stage. The Contractor will mark those trees and prepare tree inventories which are unavoidable during joint walk through survey with the PMU and PIC. At the implementation phase, the owners of the trees are not farmers because 50ft. land in each channel is donated from years ago. 9.1.2 Existing Sectionsof Canal The X-sections of the proposed rehabilitationof existing canals’ lengths which over time have been choked with earth, the width (in ft.) and land to be neededfor developing RoW is presented in Table 9.1: Table 9.1: Branch wise Land Acquisition Total Land to Name of Scheme Name of Branch Length (in ft.) Width (in ft.) beNeeded Luni Rella1 7632 15 3.63 Rella 2 5725 15 1.97 Rella 3527 15 1.21 Bagh 1 3429 15 1.18 Bagh 2 3527 15 1.21 Bagh 7523 15 2.59 Gulla Shahar 21327 12 5.88 Dephal Hasham Nullah 14699 15 5.06 Raza/Hasham/Satar 3281 15 1.13 88 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Total Land to Name of Scheme Name of Branch Length (in ft.) Width (in ft.) beNeeded Raza/Hasham 2887 15 0.99 Malik Raza 11812 15 4.03 Malak dad 1 9187 15 3.16 Malak dad 2. 6070 15 2.09 Malak Dad 3 5971 15 2.06 Malak Dad 4 26281 23 13.83 Rasool Bux 8334 15 2.87 Bugtti Nullah 31891 15 10.98 Marghzani Sibi Nullah Faqeer 10507 15 3.4 Sibi Nullah Qadir Bux 18587 15 6.4 Sibi Nullah M. Attaullah 4757 15 1.6 Kurak 10420 15 3.6 Sibi Nullah Safi 15060 15 5.2 Kurak 9863 15 3.4 Samzai 6726 15 2.3 Khajak Hameemzai 8744 15 3 Isaqzai 25838 15 8.9 Khoshi 11812 15 4.1 jam Bhramzai 10023 15 2.8 Omarzai 8235 15 2.8 Jafarzai 14961 15 5.2 Karyazai 18702 15 6.4 Sazreg Nullah 45934 20 21 Kurak Kurak 26978 15 9.3 Arand Flood Scheme Arand 5740 92 12.1 Bori Flood Scheme Luni Nullah 1906 92 4 KhajakNullah 5333 92 11.25 As the land need is only for rehabilitation work so,the detail of each farmer’s land needed for so is presented in Annexure-E. 9.1.3 Conclusion In the light of abovementioned baseline information and situation analysis, the issue of land acquisition and resettlement is concluded with the following key findings; The project is planning to undertake lining/rehabilitation of the existing Nari Gorge canals and two small flood schemes Arand and Bori. The project is not working on development of new canal development and structures requiring extra land in perennial scheme while Arand and Bori flood schemes require extra land which is provided without any compensation as Voluntary Land Donation (VLD). The primary impact area where the proposed lining of canals in flood schemes is envisaged is the ownership of farmers. The farmers dedicated this piece of land for the irrigation canal and therefore; the acquisition of land is not required.. The SIAMP team measured all the sections of Nari Gorge sub-project, it is anticipated that the proposed canal sections can be achieved within available existing canals sections. The baseline data reveals that no public, private, residential and commercial structures are observed within the RoW of the Nari Gorge canals. 89 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) There is sizeable number of trees along the irrigation canals of Nari Gorge sub-project canals were observed and recorded. Some of the trees may be cut/ uprooted during the construction phase. The farmers of all branches shown consensus and willingness to not demanding for compensation of cut/uprooted trees whereas; the Project will go plantation against the trees cut in proportionate of 1:3-5. 9.2 Land Acquisition for Yat Abad Sub-project The branch and structure wise status of land acquisition and resettlement is given in the following sections; 9.2.1 Yat Abad Currently there is no diversion structure on main Anambar River. The farmers of Yatabad are using ground water (Tubewelles), pump water from Main River and irrigate their land close to river, and sheet flow of the mountains also in use. The SIAMP team have conducted walk through survey along the length of the propose canals jointly with the farmers in the month of September, 2015. The resettlement and land acquisition survey was conducted in the RoW (as design decided) as the resettlement and land acquisition questionnaires were envisaged; there were no public, private, residential and commercial structures. The list of the likely affectees is given as Annexure-G of this report. 9.2.2 Tree Inventory During walk through survey along the proposed irrigation canal, 18148 Maskut (Keekar) trees/bushes were observed and recorded along the length of the main canal and along the branches the detail are as following; Manzaki Branch 5550, Basharat Manzaki 4070, Jahangeer Shore 3700, Manki 4810 and Jat Abad branch 4440, (owned by Livestock Department) were observed. The exact number of trees likely to be cut down cannot be confirmed at this stage. The Contractor will mark those trees and prepare tree inventories which are unavoidable during joint walk through survey with the PMU and PIC. At the implementation phase, the cut down tress shall be handed over to the farmers who are owner of the trees. The RD wise estimated details and owner ship is given in the following Table 9.2to 9.7; Table 9.2: Tree Inventory on Yatabad Main Canal Muskat (Keekar) Owners on main Canal of Yatabad RD (Length No. of Sr.No. Name of Farmer Village Name in meters) Trees 1 Haji Jahangeer/Haji Zarif Manzaki 0-134 900 2 Haji Shahjahan/H. Zarif Manzaki 135-268 800 3 Mujeebullah/H.Shar Hassan Manzaki 269-402 700 4 Jaffar Khan/Mohammad Husain Manzaki 403-536 650 5 Mohammad Anwar/M.Husain Manzaki 537-670 600 6 Kaleemullah/Haji Husain Manzaki 671-804 700 7 Haji Abdul Waheed/Haji Pahind Basharat Manzaki 805-938 600 8 Baz Mohammad/ Gul Baran Basharat Manzaki 939-1087 550 9 Haji Ghazi/Gul Baran Basharat Manzaki 1088-1207 650 10 Gul Khan/ Gul Baran Basharat Manzaki 1208-1377 600 11 Sarbuland/ Gul Baran Basharat Manzaki 1378-1527 1100 90 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Muskat (Keekar) Owners on main Canal of Yatabad RD (Length No. of Sr.No. Name of Farmer Village Name in meters) Trees 12 Haji ferooz /Gul Baran Basharat Manzaki 1528-1727 1000 13 Ashaq/Noor Mohammad Jahangeer Sher 1728-1982 500 14 Qalandar/Mir Jan Jahangeer Sher 1983-2102 500 15 Kamal Khan/Qutab Khan Jahangeer Sher 2103-2218 550 16 Ghulam Nabi/habibullah Jahangeer Sher 2219-2336 700 17 Bangul Khan/Nasrullah Khan Jahangeer Sher 2337-2436 400 18 Sanaullah/Dur Mohammad Jahangeer Sher 2437-2572 200 19 Mohammad Hussan/Miya Khan Manzaki 2573-2690 200 20 Ashraf / Jamal Khan Manzaki 2691-2749 400 21 Ghulam Nabi/Habibullah Jahangeer Sher 2750-2808 150 22 Baboo fathe / Lal Mohammad Jahangeer Sher 2809-2944 150 23 HusSIAMPn shah / Mashik mera Jahangeer Sher 2945-3044 70 24 Kaser Khan /Hashim Jahangeer Sher 3045-3134 100 25 Pir Mohammad/ Gul Baran Jahangeer Sher 3135-3262 120 26 Haji Gawar Khan /Dad Khan Jahangeer Sher 3263-3398 60 27 Asmatullah /Salah Mohammad Jahangeer Sher 3399-3498 120 28 Mujeebullah/H.Shar Hassan Jahangeer Sher 3499-3578 120 29 Bakht Mohammad /………… Jahangeer Sher 3579-3726 100 30 Malik Mana/ Murad Mohmmad Jahangeer Sher 3727-3836 100 31 Jat Abad(livestock depertment) GoB 3837-3936 3000 32 Mateen shah / Habib Shah Mankai 3937-5976 350 33 Ameen shah/Habib shah Mankai 5977-6246 250 34 Tawab Shah / Nawab Shah Mankai 6247-6346 250 35 Tayeb shah/ Nawab Shah Mankai 6347-6446 250 36 Temoor shah / Kutan shah Mankai 6447-6631 200 37 Qayum shah / Karam shah Mankai 6632-6731 300 38 Qasam shah / Karam Shah Mankai 6732-6901 150 Total 18,140 Table 9.3: Tree Inventory on Yatabad Branch Canal No. 1 Forest Trees Owners on Branch Canal No. 1 of Yatabad RD (Length Sr.No. Name and Father Name of Farmer Village in meters) No. of Trees 1 Haji Jahangeer/Haji Zarif Manzaki 0-136 800 2 Haji Shahjahan/H. Zarif Manzaki 137-408 750 3 Mujeebullah/H.Shar Hassan Manzaki 409-546 900 4 Jaffar Khan/Mohammad Husain Manzaki 547-812 690 5 Mohammad Anwar/M.Husain Manzaki 813-1012 800 6 Kaleemullah/Haji Husain Manzaki 1013-1210 800 7 Haji Noor Mohammad/Faizullah Asadullah Killi 1211-1400 800 91 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) TOTAL 5540 Table 9.4: Tree Inventory on Yatabad Branch Canal No. 2 Forest Trees Owners on Branch Canal No. 2 of Yatabad RD (Length No. of Sr.No. Name and Father Name of Farmer Village in meters) Trees 1 Haji Abdul Waheed/Haji Pahind Basharat Manzaki 0-640 700 2 Baz Mohammad/ Gul Baran Basharat Manzaki 641-1140 650 3 Haji Ghazi/Gul Baran Basharat Manzaki 1141-1860 800 4 Gul Khan/ Gul Baran Basharat Manzaki 1861-2290 600 5 Sarbuland/ Gul Baran Basharat Manzaki 2291-2900 750 6 Haji ferooz /Gul Baran Basharat Manzaki 2901-3200 570 Total 4070 Table 9.5: Tree Inventory on Yatabad Branch Canal No. 3 Forest Trees Owners on Branch Canal No. 3 of Yatabad Name and Father Name of RD (Length Sr.No. Farmer Village in meters) No. of Trees 1 Shar Jan/Mar Jan Jahangeer Sher 0-150 300 2 Ashaq/Noor Mohammad Jahangeer Sher 151-250 200 3 Qalandar/Mir Jan Jahangeer Sher 251-390 250 4 Kamal Khan/Qutab Khan Jahangeer Sher 391-560 250 5 Gawar Khan/Dad Khan Jahangeer Sher 561-675 200 6 Malik Hazar Khan/Khairo Jahangeer Sher 676-845 300 7 Ghulam Nabi/habibullah Jahangeer Sher 846-1235 350 8 Pir Mohammad/ Gul Baran Jahangeer Sher 1236-1485 250 9 Sarwar Jan/Sakhi Jan Jahangeer Sher 1486-1700 150 10 Ghulam Nabi/habibullah Jahangeer Sher 1701-1920 200 11 Bangul Khan/Nasrullah Khan Jahangeer Sher 1921-2080 200 12 Sanaullah/Dur Mohammad Jahangeer Sher 2081-2136 50 Mohammad Hussan/Miya 13 Khan Manzaki 2137-2278 150 14 Ashraf / Jamal Khan Manzaki 2279-2421 150 15 Ghulam Nabi/habibullah Jahangeer Sher 2422-2721 250 16 Baboo fathe / Lal Mohammad Jahangeer Sher 2722-2911 100 HusSIAMPn shah / Mashik 17 mera Jahangeer Sher 2912-3071 100 18 Kaser Khan /Hashim Jahangeer Sher 3072-3381 250 Total 3700 Table 9.6: Tree Inventory on Yatabad Branch Canal No. 4 Forest Trees Owners on Branch Canal No. 4 of Yatabad RD (Length Sr.No. Owner of Land in meters) No. of Trees 92 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 1 Jat Abad(livestock depertment) 0-7720 m 4440 Table 9.7: Tree Inventory on Yatabad Branch Canal No. 5 Forest Trees Owners on Branch Canal No. 5 of Yatabad Name and Father’s Name of RD (Length Sr.No. Farmer Village in meters) No. of Trees 1 Mateen shah / Habib Shah Mankai 0-120 150 2 Ameen shah/Habib shah Mankai 121-621 400 3 Tawab Shah / Nawab Shah Mankai 622-1081 350 4 Tayeb shah/ Nawab Shah Mankai 1082-1396 300 5 Temoor shah / Kutan shah Mankai 1397-1566 290 6 Qayum shah / Karam shah Mankai 1567-1976 350 7 Qasam shah / Karam Shah Mankai 1977-2166 200 8 Qadeem Shah/Ibrhim shah Mankai 2167-2666 350 9 Dost Mohammad Shah /Zair shah Mankai 2667-2921 250 10 Wali Shah / Azeem shah Mankai 2922-3201 320 11 Malik Noor Mohammad /Haji Sobidar Mankai 3202-3701 300 Saedo chena 12 Haji Gul Mir /Haji Kala Khan 3702-3991 100 Saedo chena 13 Samandar Khan / Haji Mohammad gul Kala Khan 3992-4261 250 Saedo chena 14 Dad Khan / Abdullah Jan Kala Khan 4262-4371 400 Saedo chena 15 Abdullah jan / Mohammadan Kala Khan 4372-4601 350 Saedo chena 16 Malik Janan /Khair Mohammad Kala Khan 4602-5111 250 Saedo chena 17 Malik Bahdur Khan/ Haji Gul Kala Khan 5112-5461 200 Total 4810 9.2.3 Existing Sections of Canal The X-sections of the proposed main canal in the initial reach is about 54 m while varies and on some point the width of the canal was found beyond 32m as required for RoW and on tail end is below 32m. The length of the proposed main canal is 22 km in length while it has 10 branches of different capacity and length. The length of main conveyance system and possible land in acres to be required for RoW is presented and is as under: Table 9.8: Branch wise Detail of Yatabad Irrigation Scheme Name of Branch No of Farmers Length in Km Area in Acres Main Canal 74 22 250.2 Branch Canal No. – 1 7 1.4 7.59 Branch Canal No. – 2 6 3.2 19.28 Branch Canal No. – 3 27 4.93 35.25 Branch Canal No. – 4 0 7.7 58.13 Branch Canal No. – 5 19 5.95 41.22 Branch Canal No. – 6 19 9.08 71.8 93 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Branch Canal No. – 7 5 6.3 43.65 Branch Canal No. – 8 4 4.5 28.8 Branch Canal No. – 9 8 3.25 19.58 Branch Canal No. – 10 9 1.74 10.48 Total 104 48.05 335.78 Grand Total 178 70.05 585.98 9.2.4 Impact Assessment And Mitigation Measures In the light of abovementioned baseline information and situation analysis, the issue of land acquisition and resettlement is concluded with the following key findings;  The project is planning to undertake construction of weir, conveyance system along with associated structures for which land (as explain in above section) would be required which is the ownership of the farming communities. The farmers dedicated the required piece of land for the irrigation canal and therefore; shown willingness to not demanding the land compensation and in case, additional was required for achieving the designed sections, they will provide the land.  The SIA team measured the sections of main canal and branches as mentioned earlier, the farming communities are willing to give the land free of cost for the development of the scheme.  The baseline data reveals that no public, private, residential and commercial structures are observed within the RoW of the Yatabad Irrigation system.  There is sizeable number of Muskat (keekar) trees along the irrigation canals of Yatabad canals were observed and recorded. Some of the trees may be cut/ uprooted during the construction phase. The project will compensation against the tree losses by replantation of 3-5 trees against one cut down and the project will take care of the newly planted trees for the initial three years to ensure they survive The farmers of all branches agreed to this approach. 94 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 10 ENGAGEMENT OF COMMUNITY & STAKEHOLDERS IN NARI RIVER BASIN 10.1 Consultation on Nari Gorge Sub-project 10.1.1 Consultation with Farmers of Nari Gorge Sub-projectKhajak village At the first day of baseline survey commencement, a meeting was arranged with the farmers of Khajakvillage (proposed main canal of the Khajak perennial scheme, Arand flood scheme and proposed branch channels Hameemzai Nullah, Isaqzai Nullah, Khoshi Nullah, Jam Brahamzai Nullah, Omarzai Nullah, Jafarzai Nullah, Karyazai Nullah and Sabzreg Nullah). The farmers were briefed about the objectives of the project and they were prepared for participation in walk through resettlement survey along the canal and cooperation in baseline data collection. At the end of the survey, next day another meeting of the farmers were organized briefed about the proposed engineering interventions and findings of the walk through survey on main canal and branches. In the first meeting, the farmers shown their willingness in participation and cooperation and in the second meeting, the farmers shared their views about the project and signed the copy of Tender Drawing. Table 10.1: Consultation with the Communities and their Views at Nari Gorge Sub-project Venue & Date 1st Meeting at Khajak Village on 3rdOctober,2015 2nd Meeting at same village on 4thOctober, 2015 Location/Venue Khajak Village at Sardar Khudaidad House BIWRMDP Mr. Niamatullah Khan Consultants Mr.Abdul Shakoor Kakar Mr.Sar Anjam Khan Team Members Mr.Aorangzeb Results/Outcome  The farmers expressed their willingness and cooperation with the project staff during survey and implementation of the project.  They have expressed willingness to provide land if required voluntarily(without demanding any compensation) for completing the designed canal and other appurtenant structures.  They have also committed for not demanding or creating any problem in cutting of trees/bushes along the banks of canal, in case; if the cutting was unavoidable during construction phase.  They have confirmed that there is no residential, commercial, public or private structure within RoW of 15ft and committed if the communities constructed any building within 15ft RoW after the cut off date (as agreed 3rdand 4th October, 2015) will be demolished during construction phase and will be responsibility of the owner.  Despite the earlier dissemination of the information about the scheduled meeting, those farmers who were not present in the meetings, in case, if they are raising any issue or creating any hurdles for the project, will be the responsibility of the sitting/present farmers to resolve and handle the matter. Table 10.2: List of Farmers Consulted on 3rd and 4th October, 2015 Killi Khajak Sr.No. Name and Father’s Name Tribe Village 1 Sardar Khudaidad Khan/sardar Ismail Khan Khajak/Hameemzai Khajak 2 Malak Azad Khan/malak Sayed Khan Khajak/Isaqzai Khajak 3 Malak Ahamad Khan/Moheem Khan Khajak/ Khoshi Khajak 4 Malak Mazar Khan/ Ali Khan Khajak/Bahramzai Khajak 95 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 5 Malak Hazar Khan/A. Rahman Khajak/Omarzai Khajak 6 Malak Mazar Khan/Abdullah Khan Khajak/Karyazai Khajak 7 Mussa Khan/Ahamad Khan Khajak/Doulatzai Khajak 8 Mujeebullah/Fatheh Khan Khajak/Jafarzai Khajak 9 M.Yaqoob/M.Hussain Khajak/Hameemzai Khajak 10 Niaz Mohd./ Mir Khan Khajak/Isaqzai Khajak 11 Rais M.Azeem/ Rais Taj Mohammad Khajak/Isaqzai Khajak 12 Mubarak/M.Hussain Khajak/Bahramzai Khajak 13 Mohammad Omar/Mulla Mohammad Khajak/ Khoshi Khajak 14 Allah Dina/ Fathah Khan Khajak/ Khoshi Khajak 15 Abdullah Khan/Mohammad Essa Khajak/Jafarzai Khajak 10.1.2 Consultation with Farmers of Luni main and Ralla, Ralla 1 & 2 branchs, Budra Nullah, Rarhe Nullah and Bagh Nullah 1 & 2. At the third day of baseline survey commencement, a meeting was arranged with the farmers of Luni Village (proposed main canal of perennail scheme, Bori and Arand Flood Schemes and proposed branchs Ralla, Budrha,and Bagh Nullahs). The farmers were briefed about the objectives of the project and they were prepared for participation in walk through resettlement survey along the canal and cooperation in baseline data collection. At the end of the survey, another meeting of the farmers were organized briefed about the proposed engineering interventions and findings of the walk through survey on main canal and branches. In the first meeting, the farmers shown their willingness in participation and cooperation and in the second meeting next day, the farmers shared their views about the project and signed the copy of Tender Drawing. Table 10.3: Consultation with the Communities of Luni Village Venue & Date 3rd Meeting at Luni Village on 5thand 6thOctober,2015 Location/Venue Luni Village at Sardar M. Usman House BIWRMDP Mr. Niamatullah Khan Consultants Team Mr.Abdul Shakoor Kakar Mr.Sar Anjam Khan Members Mr.Aorangzeb Results/Outcome  The farmers expressed their willingness and cooperation with the project staff during survey and implementation of the project.  They have expressed willingness to provide land if required voluntarily(without demanding any compensation) for completing the designed canal and other appurtenant structures.  They have also committed for not demanding or creating any problem in cutting of trees/bushes along the banks of canal, in case; if the cutting was unavoidable during construction phase.  They have confirmed that there is no residential, commercial, public or private structure within RoW of 15ft and committed if the communities constructed any building within 15ft RoW after the cut off date (as agreed 5thand 6th October, 2015) will be demolished during construction phase and will be responsibility of the owner.  Despite the earlier dissemination of the information about the scheduled meeting, those farmers who were not present in the meetings, in case, if they are raising any issue or creating any hurdles for the project, will be the responsibility of the sitting/present farmers to resolve and handle the matter. 96 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Table 10.4: List of Farmers Consulted on 5thand 6thOctober, 2015 Sr.No. Name and Father’s Name of Farmer Tribe Village 1 M.Anwar/ Haji Rahim Luni Kili Luni 2 Mohammad Usman/ Mohammad Khan Luni Killi Luni 3 Edayatullah/Mahmood Khan Luni Killi Luni 4 Haji Rashid/Mustafa Khan Luni Kili Luni 5 Dr. Allah Dad/ Mohammad Khan Luni Kili Luni 6 Mohammad Khan/ A. Satar Luni Kili Luni 7 Haji A. Rahman/Haji Ahamad Khanl Luni Kili Luni 8 Haji Yaqoob / Mohammad Khan Luni Kili Luni 9 Kaleem Ullah/ Misri Khan Luni Kili Luni 10 Azizullah/ Sadullah Luni Kili Luni 11 Obaidullah/ Habiullah Luni Kili Luni 12 Yaqoob/Allah Bux Luni Kili Luni 13 Ghulam Sarwar/Azamat Khan Luni Kili Luni 10.1.3 Consultation withFarmers of Marghzani canal and Branches At the fifth day of baseline survey commencement, a meeting was arranged with the farmers of Killi Marghzani(proposed main canal and proposed branchs Sibi Nullah faqeer M. Sibi Nullah Qadar Bux, Sibi Nullah Attaullah, Sibi Nullah kurak Nullah, Safi, Kurak Nullah and Samzai branch). The farmers were briefed about the objectives of the project and they were prepared for participation in walk through resettlement survey along the canal and cooperation in baseline data collection. At the end of the survey, another meeting of the farmers were organized briefed about the proposed engineering interventions and findings of the walk through survey on main canal and branches. In the first meeting, the farmers shown their willingness in participation and cooperation and in the second meeting next day, the farmers shared their views about the project and signed the copy of Tender Drawing. Table 10.5: List of Farmers Consulted in 5th &b 7th October, 2015 Venue & Date 5th Meeting at Marghzani Village on 7th and 8thOctober,2015 Location/Venue Marghzani Village malak Azizullah House BIWRMDP Mr. Niamatullah Khan Consultants Mr.Abdul Shakoor Kakar Mr.Sar Anjam Khan Team Members Mr.Aorangzeb Results/Outcome  The farmers expressed their willingness and cooperation with the project staff during survey and implementation of the project.  They have expressed willingness to provide land if required voluntarily(without demanding any compensation) for completing the designed canal and other appurtenant structures.  They have also committed for not demanding or creating any problem in cutting of trees/bushes along the banks of canal, in case; if the cutting was unavoidable during construction phase.  They have confirmed that there is no residential, commercial, public or private structure within RoW of 15ft and committed if the communities constructed any building within 15ft RoW after the cut off date (as agreed 7th and 8th October, 2015) will be demolished during construction phase and will be responsibility of the owner. 97 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP)  Despite the earlier dissemination of the information about the scheduled meeting, those farmers who were not present in the meetings, in case, if they are raising any issue or creating any hurdles for the project, will be the responsibility of the sitting/present farmers to resolve and handle the matter. Table 10.6: List of Farmers Consulted on 10th and 11th September, 2015 Sr.No. Name and Father’s Name of Farmer Tribe Village 1 Malak Faqeer Mohammad/Nouradin Shodanzai Killi Shdanzai 2 Malak Haji Bux/Noor Khan Shodanzai Killi Shdanzai 3 Mohammad Iqbal/ Zaro Khan Shodanzai Killi Shdanzai 4 Abdul Wahab/ Ghous Bax Shodanzai Killi Shdanzai 5 Qadar Bux/Ilahai Bux Malazai Marghzani 6 A.Rahman/Ghulam Yaseen Malazai Marghzani 7 Malak Lateef/malak A. Samad Malazai Marghzani 8 A. Wahab/Ghul Mohammad Malazai Marghzani 9 Malak Attaullah/Rab Nawaz Bostanzai Marghzani 10 Mohammad Sherdil/M.Nawaz Bostanzai Marghzani 11 Mohammad Qasim/Nasrullah Bostanzai Marghzani 12 Mohammad Javaid/Salah Mohammad Bostanzai Marghzani 13 Asad Khan/Allah Bux Marghzani Marghzani 14 Habib Nawaz/Khan Mohammad Marghzani Marghzani 15 Khalilullah/Arbab Khan Marghzani Marghzani 16 Mohammad Alam/Mustqeem Marghzani Marghzani 17 Malak Dur Mohammad/Ghulam Nabi Safi Marghzani 10.1.4 Consultation with Farmers of Dephal canal and Branches At the 7th day of baseline survey commencement, a meeting was arranged with the farmers of Killi Dephal (proposed main canal and proposed branchs Hasham KhanNullah, Raza hasham Satar Nullah, Raza Hasham Nullah, Malak Raza Nullah, Malakdad Nullah 1,2,3). The farmers were briefed about the objectives of the project and they were prepared for participation in walk through resettlement survey along the canal and cooperation in baseline data collection. At the end of the survey, another meeting of the farmers were organized briefed about the proposed engineering interventions and findings of the walk through survey on main canal and branches. In the first meeting, the farmers shown their willingness in participation and cooperation and in the second meeting next day, the farmers shared their views about the project and signed the copy of Tender Drawing. Table 10.7: List of Farmers Consulted in Dehpal Village on 7th & 10th and 11th September, 2015 Venue & Date 7th Meeting at Dephal Village on 9th and 10th October,2015 Location/Venue Dephal Village Malak Dad House BIWRMDP Mr. Niamatullah Khan Consultants Mr.Abdul Shakoor Kakar Mr.Sar Anjam Khan Team Members Mr.Aorangzeb Results/Outcome  The farmers expressed their willingness and cooperation with the project staff during survey and implementation of the project. 98 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP)  They have expressed willingness to provide land if required voluntarily(without demanding any compensation) for completing the designed canal and other appurtenant structures.  They have also committed for not demanding or creating any problem in cutting of trees/bushes along the banks of canal, in case; if the cutting was unavoidable during construction phase.  They have confirmed that there is no residential, commercial, public or private structure within RoW of 15ft and committed if the communities constructed any building within 15ft RoW after the cut off date (as agreed 9th and 10th October, 2015) will be demolished during construction phase and will be responsibility of the owner.  Despite the earlier dissemination of the information about the scheduled meeting, those farmers who were not present in the meetings, in case, if they are raising any issue or creating any hurdles for the project, will be the responsibility of the sitting/present farmers to resolve and handle the matter. Table 10.8: List of Farmers Consulted on 9th and 10th October, 2015 Sr.No. Name and Father’s Name of Farmer Tribe Village 1 Ghulam Nabi/Allah Dad Sardar khel Dephal Kala 2 Mohammad Anwar/Shadad Khan Sardar khel Dephal Kala 3 Mohammad Ibrahim/Rashid Khan Rashidkhel Dephal Kala 4 Imam bux /Rashid Khan Rashidkhel Dephal Kala 5 A.Karim/Mirza Khan Rashidkhel Dephal Kala 6 Rasool Bux/Noor Mohammad Rashidkhel Dephal Kala 7 A. Aziz/Noor Mohammad Bugtti Baloch Dephal Kala 8 Khuda Bux/ Metta Khan Balailzai Dephal Kala 9 Malak Dad/Abdullah Balailzai Dephal Kala 10 Haji M.Hassan/ Rasool Bux Ayoubzai Dephal Kala 11 Mohammad Ilyas/Mohammad Hussain Rashidkhel Dephal Kala 12 Ghulam Haidar/Khudidad Ghulam Bolak Dephal Kala 10.1.5 Consultation with Farmers of Kurak canal and Branches At the 9th day of baseline survey commencement, a meeting was arranged with the farmers of Killi Kurak Barozai (proposed main canal Kurak). The farmers were briefed about the objectives of the project and they were prepared for participation in walk through resettlement survey along the canal and cooperation in baseline data collection. At the end of the survey, another meeting of the farmers were organized briefed about the proposed engineering interventions and findings of the walk through survey on main canal. In the first meeting, the farmers shown their willingness in participation and cooperation and in the second meeting next day, the farmers shared their views about the project and signed the copy of Tender Drawing. Table 10.9: List of Farmers Consulted on 11th and 12th October, 2015 Venue & Date 7th Meeting at Kurak Village on 11th and 12th October,2015 Location/Venue Kurak Village Nawab Ghous Bux Barozai (X CM Balochistan) House BIWRMDP Mr. Niamatullah Khan Consultants Mr.Abdul Shakoor Kakar Mr.Sar Anjam Khan Team Members Mr.Aorangzeb 99 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Results/Outcome  The farmers expressed their willingness and cooperation with the project staff during survey and implementation of the project.  They have expressed willingness to provide land if required voluntarily(without demanding any compensation) for completing the designed canal and other appurtenant structures.  They have also committed for not demanding or creating any problem in cutting of trees/bushes along the banks of canal, in case; if the cutting was unavoidable during construction phase.  They have confirmed that there is no residential, commercial, public or private structure within RoW of 15ft and committed if the communities constructed any building within 15ft RoW after the cut off date (as agreed 11th and 12th October, 2015) will be demolished during construction phase and will be responsibility of the owner.  Despite the earlier dissemination of the information about the scheduled meeting, those farmers who were not present in the meetings, in case, if they are raising any issue or creating any hurdles for the project, will be the responsibility of the sitting/present farmers to resolve and handle the matter. Table 10.10: List of Farmers Consulted on 11th and 12th October, 2015 Sr.No. Name and Father’s Name of Farmer Tribe Village 1 Rais Abdul Hakeem/Fathah Mohammad Lalozai Kurak 2 Mohammad Isaq/Muhabat Khan Barozai Kurak 3 Baro Khan/Nawab M. Khan Barozai Kurak 4 Ahamad Khan/Atta Mohammad Bijarzai Kurak 5 Mir Mohammad/Bahr Khan Khuldband Kurak 6 Mohammad Yaqoob/A.Rahim Khulband Kurak 7 Hazoor Bux/Khair Bux Mahmoodzai Kurak 8 Khan Mohammad/Haji Khan Lalozai Kurak 9 Malak Shah Mohammad/Karam Khan Rind Gulo Shahar Qadeem 10 Tariq Aziz/Abdul Aziz Rind Gulo Shahar Qadeem 11 Abdul Ghafar/Abdul Haleem Rind Gulo Shahar Qadeem 12 Rab Nawaz/Mohammad Isaq Rind Gulo Shahar Qadeem 10.2 Consultation on Yatabad Sub-project 10.2.1 Consultation with Farmers of Yat Abad Manzaki, Basharat Manzaki and Jahangeer Shore Branches At the first day of baseline survey commencement, a meeting was arranged with the farmers of Manzaki, Basharat Manzakiand Jahangeer Shore (proposed Weir site and proposed main canal and proposed branch canal 1,2&3). The farmers were briefed about the objectives of the project and they were prepared for participation in walk through resettlement survey along the canal and cooperation in baseline data collection. At the end of the survey, next day another meeting of the farmers were organized briefed about the proposed engineering interventions and findings of the walk through survey on main canal and branches. In the first meeting, the farmers shown their willingness in participation and cooperation and in the 100 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) second meeting, the farmers shared their views about the project and signed the copy of Tender Drawing. Table 10.11: Consultation with the Communities and their Views at Yatabad scheme Venue & Date 1st Meeting at Manzaki and Basharat Manzaki on 6th September,2015 2nd Meeting at Jahangeer Shore on 7th September, 2015 Location/Venue Manzaki and Jahangeer Shore BIWRMDP Mr. Niamatullah Khan Consultants Team Mr.Abdul Shakoor Kakar Mr.Sar Anjam Khan Members Mr.Aorangzeb Results/Outcome  The farmers expressed their willingness and cooperation with the project staff during survey and implementation of the project.  They have expressed willingness to provide land if required voluntarily(without demanding any compensation) for completing the designed canal and other appurtenant structures.  They have also committed for not demanding or creating any problem in cutting of trees/bushes along the banks of canal, in case; if the cutting was unavoidable during construction phase.  They have confirmed that there is no residential, commercial, public or private structure within RoW of 54m and committed if the communities constructed any building within 54m RoW after the cutoff date (as agreed 6th and 9th September, 2015) will be demolished during construction phase and will be responsibility of the owner.  Despite the earlier dissemination of the information about the scheduled meeting, those farmers who were not present in the meetings, in case, if they are raising any issue or creating any hurdles for the project, will be the responsibility of the sitting/present farmers to resolve and handle the matter.  The farmers also requested for provision of road culverts on the canal. Table 10.12: List of Farmers Consulted on 6thand 7thSeptember, 2015 Manzaki, Basharat Manzaki and Jahangeer Shore Sr.No. Name and Father’s Name Tribe Village 1 Haji Jahangeer/Haji Zarif Luni Manzaki 2 Haji Shahjahan/H. Zarif Luni Manzaki 3 Mujeebullah/H.Shar Hassan Luni Manzaki 4 Jaffar Khan/Mohammad Husain Luni Manzaki 5 Mohammad Anwar/M.Husain Luni Manzaki 6 Haji Abdul Waheed/Haji Pahind Luni Basharat Manzaki 7 Baz Mohammad/ Gul Baran Luni Basharat Manzaki 8 Haji Ghazi/Gul Baran Luni Basharat Manzaki 9 Gul Khan/ Gul Baran Luni Basharat Manzaki 10 Ashaq/Noor Mohammad Shadozai Kakar Jahangeer Shore 11 Qalandar/Mir Jan Shadozai Kakar Jahangeer Shore 12 Kamal Khan/Qutab Khan Shadozai Kakar Jahangeer Shore 13 Ghulam Nabi/habibullah Shadozai Kakar Jahangeer Shore 14 Bangul Khan/Nasrullah Khan Shadozai Kakar Jahangeer Shore 15 Sanaullah/Dur Mohammad Shadozai Kakar Jahangeer Shore 16 Ghulam Nabi/Habibullah Shadozai Kakar Jahangeer Shore 17 Baboo fathe / Lal Mohammad Shadozai Kakar Jahangeer Shore 101 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 10.2.2 Consultation with Farmers of Branch 5, 6, 7 and 8. At the third day of baseline survey commencement, a meeting was arranged with the farmers of Manki, Ghazi China, Din Mohammad Qilla and Killi Asadullah (proposed main canal and proposed branch canals 6,7 and 8). The farmers were briefed about the objectives of the project and they were prepared for participation in walk through resettlement survey along the canal and cooperation in baseline data collection. At the end of the survey, another meeting of the farmers were organized briefed about the proposed engineering interventions and findings of the walk through survey on main canal and branches. In the first meeting, the farmers shown their willingness in participation and cooperation and in the second meeting, the farmers shared their views about the project and signed the copy of Tender Drawing. Table 10.13: Consultation with the Communities and their Views at Branch No. 6,7 and 8 Yatabad Venue & Date 3rd Meeting at Manki, Ghazi China, Din Mohammad Qilla and killi Asadullah on 8thand 9thSeptember,2015 Location/Venue Din Mohammad Qilla BIWRMDP Mr. Niamatullah Khan Consultants Team Mr.Abdul Shakoor Kakar Mr.Sar Anjam Khan Members Mr.Aorangzeb Results/Outcome  The farmers expressed their willingness and cooperation with the project staff during survey and implementation of the project.  They have expressed willingness to provide land if required voluntarily(without demanding any compensation) for completing the designed canal and other appurtenant structures.  They have also committed for not demanding or creating any problem in cutting of trees/bushes along the banks of canal, in case; if the cutting was unavoidable during construction phase.  They have confirmed that there is no residential, commercial, public or private structure within RoW of 54m and committed if the communities constructed any building within 54m RoW after the cut off date (as agreed 6th and 9th September, 2015) will be demolished during construction phase and will be responsibility of the owner.  Despite the earlier dissemination of the information about the scheduled meeting, those farmers who were not present in the meetings, in case, if they are raising any issue or creating any hurdles for the project, will be the responsibility of the sitting/present farmers to resolve and handle the matter. Table 10.14: List of Farmers Consulted on 8th and 9th September, 2015 Sr.No. Name and Father’s Name of Farmer Tribe Village 1 Malik Noor Mohammad /Haji Sobidar Tareen Kili Asadullah Khan 2 Akber Tareen / Haji Sobidar Khan Tareen Kili Asadullah Khan 3 Aslam Khan / Shobidar kahn Tareen Kili Asadullah Khan 4 Sarwar Khan / Noor Mohammad Tareen Kili Asadullah Khan 5 Kamal Khan/ Noor Mohammad Tareen Kili Asadullah Khan Saedo chena Kala 6 Malik Janan /Khair Mohammad Ustranai Khan Saedo chena Kala 7 Malik Bahdur Khan/ Haji Gul Ustranai Khan 102 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 8 Khair Mohammad / Sultan Mohammad Ustranai Ghazi Chena 9 Mohammad Khan / Nazar Mohammad Ustranai Ghazi Chena 10 Malik Sattar /Malik Waheed Tareen Din Mohammad Qilla 11 Malik Amir Mohammad / Abdul Rehman Ustranai Din Mohammad Qilla Malik Faqeer Mohammad/ Abdul 12 Rehman Ustranai Din Mohammad Qilla 13 Malik Dewa Khan/ Abdullah Khan Ustranai Din Mohammad Qilla 14 Sahib Khan / Gul Bahran Ustranai Din Mohammad Qilla 15 Fateh Mohammad / Kala Khan Ustranai Din Mohammad Qilla 10.2.3 Consultation with Farmers of Branch No.of 9 & 10 of Ismail Shahar At the fifth day of baseline survey commencement, a meeting was arranged with the farmers of Killi Ismail Shahar owners of branch 9 &10 (proposed main canal and proposed branch canals). The farmers were briefed about the objectives of the project and they were prepared for participation in walk through resettlement survey along the canal and cooperation in baseline data collection. At the end of the survey, another meeting of the farmers were organized briefed about the proposed engineering interventions and findings of the walk through survey on main canal and branches. In the first meeting, the farmers shown their willingness in participation and cooperation and in the second meeting, the farmers shared their views about the project and signed the copy of Tender Drawing. Table 10.15: Consultation with the Communities Sardar Shahar, Gaman Shahar and Killi Abdullah Yatabad Venue & Date 4th Meeting at Ismail Shahar, (Sardar Shahar, Gaman Shahar and Killi Abdullah) on 10th and 11th September,2015 Location/Venue Ismail Shahar BIWRMDP Mr. Niamatullah Khan Consultants Mr.Abdul Shakoor Kakar Mr.Sar Anjam Khan Team Members Mr.Aorangzeb Results/Outcom  The farmers expressed their willingness and cooperation with the e project staff during survey and implementation of the project.  They have expressed willingness to provide land if required voluntarily(without demanding any compensation) for completing the designed canal and other appurtenant structures.  They have also committed for not demanding or creating any problem in cutting of trees/bushes along the banks of canal, in case; if the cutting was unavoidable during construction phase.  They have confirmed that there is no residential, commercial, public or private structure within RoW of 54m and committed if the communities constructed any building within 54m RoW after the cut off date (as agreed 6th and 9th September, 2015) will be demolished during construction phase and will be responsibility of the owner.  Despite the earlier dissemination of the information about the scheduled meeting, those farmers who were not present in the meetings, in case, if they are raising any issue or creating any hurdles for the project, will be the responsibility of the sitting/present farmers to resolve and handle the matter.  The farmers also requested for provision of road culverts on the canal.  The farmers also requested for provision of extension for main canal (2 kilometer) Table 10.16: List of Farmers Consulted on 10th and 11th September, 2015 103 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Sr.No. Name and Father Name of Farmer Tribe Village 1 Aslam Khan / Shobidar kahn Tareen Ismail Shahar 2 Zahir Khan/ Mohammad Aslam Tareen Ismail Shahar 3 Shadi Khan Tareen Ismail Shahar 4 Akbar Khan/Khan Badur Tareen Ismail Shahar 5 Sardar Shafiq/S. Faqeer Mohammad Tareen Ismail Shahar 6 Abdul Rauf/Abdul Rashid Tareen Ismail Shahar 7 Jalil Khan/Abdul Aziz Tareen Ismail Shahar 8 Tahir Jan/ haji Mohammad jan Tareen Ismail Shahar 9 Sardar Shadozai/Ali Mohammad Tareen Ismail Shahar 10 Mohammad Rahim/karam Tareen Ismail Shahar 11 Mohammad Razaq/ Karam Tareen Ismail Shahar 12 Sardar Shafiq /Faqeer Mohammad Tareen Ismail Shahar 13 Mohammad Shohaib/Niaz Mohammad Tareen Ismail Shahar 14 Amir Jan/Samad Jan Tareen Ismail Shahar 15 Noor Shadozai/Malik Noor Mohammad Tareen Ismail Shahar 16 Faqeer Mohammad/ Salah Mohammad Tareen Ismail Shahar 17 Noor Gul/ Allah Yar Khan Tareen Ismail Shahar During consultation with the farmers of Yatabad scheme they have expressed concern over the length of main canal which will create conflict between the farmers scheme. They requested for extension of 2.5 km of main canal. It is expected that considering the design of main canal extension. 104 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) PART-C SOCIAL MANGEMENT PLANNING BIWRMDP 105 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 11 RESETTLEMENT POLICY FRAMEWORK (RPF) FOR BIWRMDP 11.1 Introduction This Resettlement Policy Framework (RPF) has been prepared for the BIWRMDP Project as required under the World Bank policy 4.12 Involuntary Resettlement. The Implementing Agency i.e. Irrigation Department Government of Balochistan is committed to make all possible efforts to use the free of cost lands through voluntary donations of communities’ common lands, lands donations by local/district governments or other government line agencies; and fully and sufficiently mitigate any possible adverse impacts associated with the sub-projects under BIWRMDP. This section presents the principles of valuation and compensation for the private as well as public lands, physical properties and infrastructure to be acquired and/or relocated for the Project and the population to be displaced by the Project, in the light of the local and international policy, legal and institutional frameworks. No single issue is more critical to the social acceptability of the Project than the issue of valuation and compensation of the lands and properties, to be acquired for the Project. This aspect becomes all the more important because of the general public perception, that the government authorities generally do not adequately and earnestly address the compensation and resettlement issues in the planning and construction of projects. Another set of issues, greatly underrated and sometimes altogether disregarded, are the social, cultural and economic trauma and endeavours, through which the displaced people, especially poor, have to undergo, on account of the places and relations, left behind and in regard to the adjustment to the new places of their abiding. It needs to be appreciated that for many of the displaced people, it is not only their displacement from homes and lands, but also from their established livelihoods. The aforesaid considerations and complexities, which are sufficiently serious, render the resettlement an integral and very important component of the Project, rather than merely a mitigation measure to the impact of displacement. 11.2 Purpose of the Policy Framework The purpose of the Resettlement Policy Framework (RPF) is to further clarify resettlement principles and to provide guidance for assessment and resettlement planning against any unanticipated impacts during the dam construction and/or any additional land acquisition for any project components during implementation. The Framework also fulfills the requirements of the World Bank OP 4.12 Involuntary Resettlement for development of a policy framework in the case of projects involving significant and complex resettlement activities at implementation. It also sets out as per the WB guidelines the policy and procedures to be adopted by Balochistan Irrigation Department (BID) for any additional project intervention and mitigation. The resettlement framework establishes the resettlement and compensation principles and entitlement matrix, the organizational arrangements and the resettlement planning for the affected population during the Project implementation stage. All efforts will be deployed by the Project to minimize the need for resettlement and reduce disruption at the Project implementation stage. 11.3 Scope and Triggers The Involuntary Resettlement Policy (OP/BP 4.12) may be triggered by the project works planned, the construction, rehabilitation, extension and improvement of irrigation infrastructure 106 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) under BIWRDMP, could potentially lead to involuntary resettlement impacts.. The construction activities may also involve use of some lands for temporary purposes, such as storage of construction material, establishment of construction camps. 11.4 Policy & Legal Framework 11.4.1 The Land Acquisition (LAA) Act 1894 The Land Acquisition Act (LAA) of 1894 is the key legislation that has direct relevance to resettlement and compensation in Pakistan. Each province has its own interpretation of the LAA, and some provinces have also passed provincial legislations. The Land Acquisition (Balochistan Amendment) Act 1985 having been passed by the provincial assembly of Balochistan on 9th October, 1985. The LAA and its implementation rules require that before implementation of any development project the privately owned land and crops are compensated to titled landowners and/or registered tenants/users etc. Based on the LAA, only legal owners and tenants registered with the Land Revenue Department or those possessing formal lease agreements are eligible for compensation. Under this Act, users of the Rights of Way (RoW) are not considered "affected persons" and thus not entitled to any mitigating measure, compensation, or livelihood support. Also, there is no legal obligation to provide compensation to title-less land users, unregistered tenants, squatters or encroachers for rehabilitation. The exceptions to the rule can be explained by the fact that the law is not rigid and is broadly interpreted depending on operational requirements, local needs, and socio-economic circumstances. The key Sections of the LAA, (with amended sections of 1985) are briefly described below: Section 3: According to this Section, land means land along with any superstructure, fixtures, etc., thereon and benefits accruing there from. For the purposes of Act, land includes buildings, and also trees and standing crops. Land thus is a sum total of land plus benefits arising out of land plus all objects/things attached to or permanently fastened to anything attached to it. Section 4: Section 4 details the first step in the land acquisition process under the LAA. A preliminary notice is served by the government expressing its desire to "enter upon" broadly identified private lands for surveying and soil-testing for the specified public purposes.Requirements of publication of the notification under LAA are mandatory, and the acquisition proceedings would stand invalid if requirements of this section are not fully satisfied. Notification of LAA is a public pronouncement by appropriate government officer, empowered to publish a notification to that effect in official gazette in order to put those who are affected or likely to be affected on due notice. Purpose of LAA is to carry out preliminary investigation/land survey with a view to find out after necessary survey whether land was suitable for purposes for which it was sought to be acquired. Section 4 puts owners of land on alert that land is going to be acquired. Section 5: The initial notification under the LAA is followed and confirmed by way of a second notification under the Act. Under this Section, the marking and measurement of the land and assessment of compensation is carried out. The cash compensation is assessed on the basis of five or three years average registered market rate, and is paid to the landowners for their lands being acquired. 107 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Under section 5, the owners of land or those affected or likely to be affected, may raise objections over the intent of land acquisition or survey report to the competent authority within 30 days of notification under section 5 for the hearing of objections. Section 6: Once an area in the locality is fixed to be acquired, it is notified by publishing the notification. The exact purpose of acquisition of land is also mentioned in the notification, and the land may be acquired only for the purpose thus specified. Any proposal for further acquisition in the same locality would have to be followed up by a fresh notification under the LAA. Section 8: Affectees are made aware of the exact measurement of their respective lands/structures and the value of land under acquisition through issuance of notification under the LAA. Section 9: Stating that the land is intended to be possessed and claims for compensation for all interests in the land may be made to the officer concerned and all persons interested/affected should appear before him at a given place and time not being earlier than 15 days after the publication of said notice. Sections10, 11 and 12: According to section 10, the Collector (defined under section 17 of the LAA) publicly declares/announces awards. Generally the award is declared at place where affectees can get together and hear the award. Affectees can either accept the award or reject the award; however, in any case the affectees have to sign the award mentioning whether they accept the award and the compensation offered therein or reject the award and sign under protest. Section 17: Under the this section, the Collector is authorized to acquire land on the basis of the situation declared as an "emergency situation" on behalf of the government and can avoid the formalities to be completed and to avoid any delay in proceedings. In such a situation, the Collector under Section 17(4) can pass an award without looking into or addressing the objections/complaints of affectees. Proceedings under this section are independent and not subject to any restrictions and conditions. Possession of Land When the Collector has made an award under section 11/12, he may take possession of the land which shall thereupon vest absolutely in the government/ or acquiring department free form all encumbrances. Under this Act, only legal owners and tenants officially registered with the Land Revenue Department or possessing formal lease agreements are considered "eligible" for land compensation. 11.4.2 Resettlement Policy Framework The Resettlement Policy Framework (RPF) is already prepared for the BIWRD Project and revised as well incorporated in this SIAMP report will be followed during the implementation of the project. 11.4.3 World Bank Resettlement Operational Policy (OP 4.12) This policy pertains to any World Bank financed project, which directly or indirectly involves partly or as a whole Resettlement (OP 4.12). 108 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) The World Bank's experience indicates that involuntary resettlement under development projects, if unmitigated, often gives rise to severe economic, social, and environmental risks: production systems are dismantled; people face impoverishment when their productive assets or income sources are lost; people are relocated to environments where their productive skills may be less applicable and the competition for resources greater; community institutions and social networks are weakened; kin groups are dispersed; and cultural identity, traditional authority, and the potential for mutual help are diminished or lost. This policy includes safeguards to address and mitigate these impoverishment risks. The overall objectives of the Policy are given below:  Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs.  Where it is not feasible to avoid resettlement, resettlement activities should be conceived and executed as sustainable development programs, providing sufficient investment resources to enable the persons displaced by the project to share in project benefits. Displaced persons should be meaningfully consulted and should have opportunities to participate in planning and implementing resettlement programs.  Displaced persons should be assisted in their efforts to improve their livelihoods and standards of living or at least to restore them, in real terms, to pre-displacement levels or to levels prevailing prior to the beginning of project implementation, whichever is higher.  The Policy defines the requirement of preparing a resettlement plan or a resettlement policy framework, in order to address the involuntary resettlement. This policy covers direct economic and social impacts from Bank-assisted investment projects that may be caused by:  The involuntary taking of land resulting in – Relocation or loss of shelter; – Loss of assets or access to assets; or – Loss of income sources or means of livelihood, whether or not the PAP must move to another location.  The involuntary restrictions of access to legally designated parks and protected areas resulting in adverse impacts on the livelihoods of the displaced persons. According to the World Bank policy, the following measures should be adopted regarding project affected people:  Informed about options and rights pertaining to resettlement matters  Consulted on choices offered and provided with technically and economically feasible resettlement alternatives  Provided prompt and effective compensation at full replacement cost for losses of assets attributable directly to the project  Provided assistance like moving allowances during relocation; and offered support after displacement, for a transition period, based on a reasonable estimate of the time likely to be needed to restore their livelihood and standards of living  Provided with development assistance 109 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP)  Provided counselling in respect of credit facilities, trainings, or jobopportunities; and Provided with measures to assist the displaced persons in their efforts to improve their livelihoods, or at least to restore, in real terms. Under the WB OP, the PAPs may be classified in one of the following three groups. 1. Who have formal legal right of land (including customary and traditional rights) recognized under the laws of the country 2. Who do not have formal legal rights of land at the time of census begins but have a claim to such land or assets provided that such claims are recognized under the laws of the country or become recognized through a process identified in the resettlement policy. 3. Who have no recognized legal right or claim of the land they are occupying To achieve the objectives of this policy, different planning instruments are used, depending on the type of project: (a) a resettlement plan or abbreviated resettlement plan is required for all operations that entail involuntary resettlement unless otherwise specified; (b) a resettlement policy framework is required for operations referred to in paras. 26-30 that may entail involuntary resettlement, unless otherwise specified; and (c) a process framework is prepared for projects involving restriction of acces. The borrower is responsible for preparing, implementing, and monitoring a resettlement plan, a resettlement policy framework, or a process framework (the "resettlement instruments"), as appropriate, that conform to this policy. The resettlement instrument presents a strategy for achieving the objectives of the policy and covers all aspects of the proposed resettlement. Borrower commitment to, and capacity for, undertaking successful resettlement is a key determinant of Bank involvement in a project. 11.4.4 Comparison of Pakistan and World Bank Resettlement Policy Pakistan’s environmental and social assessment procedures are in general based on and in line with the environmental guidelines of the World Bank. However there are some contradictions between the Pakistan legislation and the World Bank safeguards particularly regarding land acquisition and the resettlement of PAPs. The WB OP explicitly makes adequate provision for the PAPs who are either displaced or suffer losses, as a result of the development project to be catered for. Livelihoods of persons to be affected must be protected, but in cases where it is inevitable, minimal displacements should occur. In such cases where displacement is unavoidable, compensation should be paid to the PAPs to help them to restore their social, economic and environmental livelihoods. The LAA, 1894 makes provision for compensation to be paid only to PAPs having suffered any loss who can produce a form of title that is legal in the form of occupancy / ownership or a legally binding tenancy agreement to the land in question. However, the WB policy requires all forms of losses, regardless of rights to land, be catered for to some degree. The WB OP requires that the affected persons be assisted during their transition period in the resettlement site and efforts made to restore their livelihoods, whereas LAA, 1894 does not 110 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) include such a requirement. Table 11.1 given below highlights the main comparisons between the LAA, 1894 and the WB OP on Involuntary Resettlement. Table 11.1: Comparison of LAA and Remedial Measures to Bridge the Gap Pakistan’s Land Acquisition Act, 1894 WB Involuntary Resettlement Policy Compensation only for titled landowners or holders of Lack of title should not be a bar to compensation and/or customary rights. rehabilitation. Crop losses compensation provided only to registered Crop losses compensation provided to landowners and landowners and share-crop/lease tenants. share-crop/lease tenants whether registered or not Land valuation based on the median registered land Land valuation based on current market rate/replacement transfer rate over the previous 3 years. value Land Acquisition Collector (LAC) is the only pre- Disputes, complaints and grievances are resolved litigation final authority to decide disputes and address informally through community participation in the complaints regarding quantification and assessment of Grievance Redress Committees, Local governments, and compensation for the affected assets NGO and/or local-level community based organizations (CBOs) The decisions regarding land acquisition and Information related to quantification and costing of land, compensations to be paid are published in the official structures and other assets, entitlements, and amounts of Gazette and notified in convenient places so that the compensation and financial assistance are to be disclosed people affected are aware to the affected persons prior to taking possession of their assets. No provision for income/livelihood rehabilitation The WB policy requires rehabilitation for income/livelihood, measure, allowances for severely affected APs and for severe losses, and for expenses incurred by the PAPs vulnerable groups, or resettlement expenses during the relocation process. In principle, Pakistan’s law and WB policy adhere not only to the objective of compensation for affected families, but also to the objective of rehabilitation. However, Pakistan’s law is unclear on how rehabilitation is to be achieved and in practice the provision of rehabilitation is left to ad hoc arrangements taken by provincial governments and the specific project proponents. To clarify these issues and reconcile eventual gaps between Pakistan’s Law and WB Policy, this RFP for the rehabilitation of the Guddu Barrage project has been prepared which ensures the following:  Compensation for any privately owned land lost as a result of the works  Compensation for lost assets regardless of rights to land on which they are sited  Valuation of assets and land at the prevailing market rate  Resettlement assistance shall be offered to all Project Affected Persons, regardless of legal entitlement to the land they occupy  Provision of additional allowances for vulnerable PAPs  Provision of additional allowance for those who may suffer commercial losses  Establishment of a Grievance Redress Committee as part of any Resettlement Action Plan 111 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 12 ELIGIBILITY AND ENTITLEMENT CRITERIA A criteria for the eligibility of PAPs and entitlements due has been prepared as part of this RPF. 12.1 Category of Displaced Person The likely displaced persons can be categorized into following groups, namely: 12.1.1 Affected Individual An affected individual is one who suffers loss of assets or investments, land and property and/or access to natural and/or economical resources as a result of the sub- project and to whom compensation is due. For example, an affected individual is a person who farms, or who has built a structure on land that is now required by a sub project for purposes other than farming or residence by the initial individuals. 12.1.2 Affected Household A household is affected if one or more of its members is affected by project activities, either by loss of property, land, loss of access or otherwise affected in any way by project activities. This provides for:  Any members in the households, men, women, children, dependent relatives and friends, tenants.  Relatives who depend on one another for their daily existence  Other vulnerable people who cannot participate for physical or cultural reasons in production, consumption, or co-residence. 12.1.3 Affected Local Community A community is affected if project activities affect their socio-economic and/or social-cultural relationships or cohesion. 12.1.4 Vulnerable Households Vulnerable households may have different land needs, or reduced ability to absorb changes, or needs unrelated to the amount of land available to them and may include the following:  Unmarried women living alone  Elderly  The infirm or ill  Orphans  Those living below the poverty line It is expected that the project activities in the area will generate employment opportunities. On completion of rehabilitation work reliability and efficiency of irrigation water will be increased which will help to increase socio-economic activities in the area, thus making positive impacts on the incomes of the vulnerable groups. 112 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 12.2 Eligibility Criteria Each category of vulnerable person or household must be compensated according to the nature of the economic loss suffered by loss of access to or use of the land acquired by the sub-project. The Bank’s OP4.12 suggests the following three criteria for eligibility;  Those who have formal legal right of land (including customary and traditional rights) recognized under the laws of the country  Those who do not have formal legal rights of land at the time of census begins but have a claim to such land or assets provided that such claims are recognized under the laws of the country or become recognized through a process identified in the resettlement policy.  Those who have no recognized legal right or claim of the land they are occupying Those covered under 1) and 2) above are to be provided compensation for the land they lose, and other assistance in accordance with the policy. Persons covered under 3) above are to be provided with resettlement assistance in lieu of compensation for the land they occupy, and other assistance, as necessary, to achieve the objectives set out in this framework, if they occupy the project area prior to a cut-off date established by an RAP and acceptable to the Bank. Persons who encroach on the area after the cut-off date are not entitled to compensation or any other form of resettlement assistance. All persons included in 1), 2) or 3) above are to be provided with compensation for loss of assets other than land. It is clear that all affected persons irrespective of their status or whether they have formal titles, legal rights or not, are eligible for some kind of assistance if they occupied the land before the entitlement cut-off date. The entitlement cut-off date refers to the time when the assessment of persons and their property in the project area is carried out, i.e. the time when the project area has been identified and when the socio-economic study is taking place. Thereafter, no new cases of affected people will be considered. Persons who encroach upon the area after the socio-economic survey (census and valuation) are not eligible for compensation or any form of resettlement assistance. 12.3 Method to Determine the Cut – Off Dates The entitlement cut-off date refers to the time when the assessment of persons and their property in the sub-project area is carried out, i.e. the time when the CoI has been identified and when the site-specific socio-economic study is taking place. Thereafter, no new cases of affected people will be considered. The establishment of a cut-off date is required to prevent opportunistic invasions/rush migration into the chosen land areas thereby posing a major risk to the sub-project. Therefore, establishment of a cut-off date is of critical importance and must be defined in the RAP as well as publicised at resettlement locations and discussed during consultations with PAPs. Where there are clearly no identified owners or users of land or assets, the relevant revenue Officer of District will be consulted. 12.4 Entitlements In accordance with WB OP 4.12 and Land Acquisition Act, the following catogeries of entitlements will be provided. Detailed entitlements will be elaborated and developed based on the following, : 113 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP)  Entitlement for those with rights (formal or recognisable) to the land they occupy: – Cash compensation for lost land, or provision of alternative land with formal rights (agricultural land or housing sites) – Cash compensation for lost assets, or provision of alternative assets (including housing) – Moving allowance – Transition allowance – Compensation for loss of earning in the case of loss of business  Entitlement for those without rights to the land they occupy: – Cash compensation for lost assets – Provision of alternative site to reconstruct lost structural assets, or cash compensation adequate to gain formal rights to alternative land adequate for reconstruction of lost structural assets – Moving allowance – Compensation for loss of earning in the case of loss of business Where alternative entitlements are offered, the final decision on the suitable entitlement shall be made during consultations with the PAPs to whom the entitlements are due. Additional cash compensation is also offered to PAPs who are considered vulnerable. 12.4.1 Land Needs and Community Contribution As designed, the project involves largely rehabilitation of existing irrigation facilities, such as canals and on-farm structures. Therefore the land needs are expected to be small for the project construction activities. Most of the schemes are anticipated to be community-owned and operated. They are among the primary beneficiaries of the project. The project is designed to rely heavily on communities, orgnaized under water user groups, for the schele selection, design, construction and operation. As indicated through community engagement in the social assessment, the communities are willing to donate the required land for project scheme construction. The primary reason for this willingness is that they are the target beneficiaries, the land needs are small and scattered. Mostly importantly, these are mostly community owned and operated schmes and there is a traditional practice in local areas of land donation for community schemes. The project will use as much as possible public lands. Where public lands are not available, following on the above, the project will also accept Voluntary Land Dnation (VLD) mechanism for its construction activities; hence, Given the design and alignment and size of the proposed structures, the land needs will be resolved through using existing public lands or community and private donations. In case of donations, in order to ensure a transparent process, non-pressuring environment and its voluntary nature, the project will discuss and agree with associated communities and privateland owners, following the process below,  The contractor will finalize the alignment, demarcate the land needs on the ground and inform the community and private land owners; 114 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP)  The contractor, along with PIU, will confirm the land ownership, household poverty status, and that the land is free of third party use or otherencumbances.  The contractor and the PIU will discuss the land donation issues with the community or land owners in the presence of community leaders;  The process will be documented and signed by all parties present, to record the following (i) the ownership of the land and evidence indicating the voluntary nature of the donation; (ii) the appropriateness of the donation for the intended purpose; (iii) the economic status of the donor that he/she is above the poverty line or whose remaining holdings are economically viable; (iv) no encumbrances on the land; (v) no negative livelihood impact on any vulnerable groups; (vi) no compensation to be paid, and (vii) that the owner gives up all claims on the land and the title will be transferred to the recipient through procedure prescribed by the law of the state. The documentations will be prepared reviewed by the relevant district and government departments for inclusion in the districts’ Annual Development Plan. The documentation will be filed at district government offices for regular monitoring and supervision to check for compliance with this Resettlement Policy Framework. These will also be submitted to the PMU and the World Bank. 12.4.2 Implementation Needs At Scheme and Basin levels, the field surveys show that the population and irrigation density, of the area to be affected by the project, is very low. It can be safely deduced from the field survey data that no major resettlement or relocation is required for the project. Most of the Sub-projects are having exisitng system and needs to be rehabilitated or lined under the BIWRMDP. If in case, there is a new development and the land qcquisiton is required, the relvant communities are willing to donate the land for the best interest of the Sub- project. To further avoid the disturbance, it is recommended to adjust the engineering designs accordingly and realign the activities to avoid any resettlement/relocation. However, minor relocations are still needed at the sub-project level of the BIWRMDP. Moreover, it must be noted that in many cases where relocation is to take place, the new identified or allocated place is just a few yards away. This will ensure that the sense of belonging of the area inhabitants to their respective lands is not disturbed, and the project does not bring about any cultural issues in this regard. 12.4.3 Compensation for Government Owned Land and Fixed Assets A. Land and Buildings: The government, including semi-government bodies, own lands in following different forms, in the Project area: Cultivated, cultivable and uncultivable lands; Land under streams ponds, andreserved forest; Land under roads and public ways (Rasta) Land under right of way for gas pipe line; Land under buildings like basic health units (BHU), schools, government offices, telephone exchanges, etc. 115 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) B. The following is proposed regarding compensation of government owned lands and buildings: Government owned lands under streams, ponds, forests and vacant lands shall be transferred to the Project, without any financial transaction. Lands under any government owned public infrastructure like roads and gas lines shall be paid for to the relevant departments, not on the basis of the area acquired, but on the basis of land requirements for the relocated and replaced infrastructure. a)Lands under government buildings shall get transferred, officially b) Relocation and Replacement of Public Infrastructure Facilities. The project shall provide for realigning, relocation and replacement of the public infrastructure including roads, power lines, telephone lines and gas pipeline. All the disconnected surrounding communities and settlements shall be restored. C. Trees: Against every tree cut, new nursery plantation will be made by the project at a rate of 1:3-5.The contractor will be responsible for the inventory of the trees to be cut and the replantation. This will be reflected in the construction contracto. The PIU will be overall responsible for the replantation and will supervise the contractors’ performance in this regard. 116 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 13 GRIEVANCE REDRESS MECHANISM 13.1 General The BIWRMDP is committed to grievance redress, collaborative problem solving, and alternative dispute resolution. Effectively addressing the grievances from people impacted by the the Projects is a core component of managing operational risk. Grievance Redress Mechanisms (GRMs) will be an effective tool for early identification, assessment, and resolution of complaints. Understanding when and how a GRM will improve Project outcomes and help both project teams and beneficiaries for improved results. The approach to Grievance Redress will be through three interlinked steps: (i) a risk-based assessment of potential grievances, disputes or conflicts that may arise during project implementation; (ii) identification of the PMU’s existing capacity for grievance redress; and (iii) an action plan that identifies mechanisms at the project level and where applicable. Action plan will necessarily be BIWRMDP specific, but would focus on tangible arrangements and steps. A key emphasis will be to support improved departmental capacity for addressing disputes that might arise from Project impacts. A firm channel and mechanism will be adopted which will include: 1 Access Point / Complaint Uptake - The uptake channels should be established and publicized by the PMU and where relevant, the contractors. 2 Grievance Recording – It will be made sure that all incidents and complaints/grievances are well and timely recorded. 3 Assessment and Acknowledgment - Eligibility would be made to ensure that the issue being raised is relevant to the Project. A written response to the complainant, acknowledging receipt and detailing the next steps will duly be done and; response to the aggrieved about the mechanism and time span or referring to the next or appropriate channel for redress will be made which is on the part of the client. 4 Resolve and Follow-up – All grievances would be resolved with stipulated time span at respective level with needed follow-up. 5 Record and Reporting - The PMU will provide tracking numbers to the grievances received to have awareness on redressed or not, and opportunity of referring to the next level or third party. The Bank team would be provided the grievance data through scheduled progress reports on the status of grievance redress in order to support the PMU in early identification of developing any risks by the Task Team. The issues of grievances related to land donations and other project developments under BIWRMDP will be reported and addressed through the PMU and locally established Set-ups. It will be a tiered system at Union Council Level, District Level, River Basin Level and the Project Level. The Farmers Organizations (FOs) established under the project will play role in GRM. All grievances will be recorded and within a stipulated time period, redressed. 13.2 Objectives of Grievance Redress Mechanism A grievance redress mechanism (GRM), consistent with the requirements of the World Bank Operational Policies and Guidelines will be established to prevent and address community concerns, reduce risks, and assist the project to maximize environmental and social benefits. In addition to serving as a platform to resolve grievances, the GRM has been designed to help achieve the following objectives: (a) Open channels for effective communication, including the identification of new social issues of concern arising from the project; (b) Demonstrate concerns about community members and their environmental well- 117 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) being; and (c) Prevent and mitigate any adverse social impacts on communities caused by project implementation and operations. The GRM will be accessible to diverse members of the community, including more vulnerable groups such as women and youth. Opportunities for confidentiality and privacy for complainants are to be honored where this is seen as important. 13.3 Principles, Procedures and Timelines Bearing in mind the range of possible grievances, following three basic standards shall underpin the proposed systems for handling these:  All grievances submitted in writing to staff assigned under the proposed PublicComplaints Centre (PCC) for the projectwill be formally recorded, and a written acknowledgement issued to the aggrieved;  Grievances will be dealt with a referral basis; those that the Contractor or the Project Implementation Consultant (PIC) are unable to resolve will be referred to the Grievance Redress Committee, with a final provision for appeal to Project Director, if an issue cannot be resolved with the PMU of the project.  Every effort will be made to address or resolve grievances within the belowexplained fixed time-lines, which will be an indicator against the performance of the handling system: - Acknowledgement of a written submission will be issued to the complainant within three working days. If not resolved earlier by the Contractor or Supervisory staff on site; - Grievances will be tabled for discussion/resolution to the Project Director within one week of receipt of the written submission. The Project Director will forward it to the Grievance Redress Committee, - If not satisfactorily resolved by the Grievance Redress Committee; the grievance will be referred to consideration by Secretary, Irrigation Department Government of Balochistanwithin 1 week.  The cases that prove impossible to resolve through Grievance Redress Committee may be referred to the Project Steering Committee (PSC)established under the Planning and Development Department (P&D), Government of Balochistan, comprising senior representatives from P&D, Irrigation Department. This Board will meet as needed to adjudicate on cases and either send their recommendations for endorsement to the Secretary, P&D or refer these for legal action. Where feasible, a response will be forthcoming to such appeals within one month of submission.  If the complainant is not satisfied, the complaint will have the option to seek redress through court of law. 13.4 Recording and Monitoring The Project ManagementUnit (PMU)will maintain the data base to document all complaints received from the local communities. The information recorded in the data base register will include date of the complaint, particulars of the complainant, description of the grievance, actions to be taken, the person responsible to take the action, movement of the document (forwarded to whom / which Committee), follow up requirements and the target date for the implementation of the mitigation measure. The data base will also record the actual measures 118 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) taken to mitigate these concerns. All complaints received in writing or received verbally will be properly recorded and documented. 13.5 Dissemination Once finalized, procedures to be followed through the grievance handling system will be translated into local languages (Urdu, Sindhi and Balochi). These shall be made available (in both leaflet and poster format) to all stakeholders, through the PD office and Deputy Commissioner Lasbela, Loralai and Sibi. The PD will ensure that copies of the standard grievance registration form are available with, Consultants, and Contractor and are kept in sufficient numbers in local government/ and area administration offices as Deputy Commissioner Lasbela during the entire period of implementation. PD shall also ensure that the database of all grievances submitted is updated on a regular basis, and that information on the status of individual cases is made available as required. 13.6 Proposed Mechanism for Grievance Redress under BIWRMDP It is proposed to establish the following prior to commencing project implementation activities including pre-construction activities: (b) A Public Complaints Centre (PCC) will be established in the project office and will be responsible to receive, log, and resolve complaints; (c) A Grievance Redress Committee (GRC) will be established in the PMU office, responsible to oversee the functioning of the PCC (d) A non-judicial decision-making authority e.g. Project Steering Committee, for resolving grievances that cannot be resolved by PCC; (e) Grievance Focal Points (GFPs), which will be educated people from each community. The GFPs should be community members who easily approached by the community. The GFPs will be provided training by the Social Section of the PIC and PMU. 13.7 Public Complaints Centre In its capacity as the project proponent, the PMU in consultation with the Irrigation Department, Balochistanwill establish a Public Complaints Centre (PCC) in the PMU office. The PMU and the local government bodies will issues public notices to inform the public within the project area of the Grievance Redress Mechanism. The PCC’s phone number, fax, address, email address will be disseminated to the people through displays at the respective offices of the Deputy Commissioner office Lasbela, Loralai and Sibi. The PCC will be staffed by a full-time officer from the PMU and will be independent of the PIC and contractor/operator. The officer should have experience and/or training in dealing with complaints and mediation of disputes. The PCC officer will have resources and facilities to maintain a complaints database and communicate with contractor, Site Engineers, PIC, DC Lasbela, Loralai and Sibi and also with complainants. The PCC will be responsible to receive, log, and resolve grievances. Given that the female community members have restricted mobility outside of their villages and homes, the female PMU staff will be required to undertake visits to the local communities. The frequency of visits will depend on the nature and magnitude of activity in an area and the frequency of grievances. 119 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 13.8 Grievance Redress Committee (GRC) The GRC will function as an independent body that will regulate PCC and the grievance redress process. It will comprise of Sociologist, Senior Engineer from PMU representative. 13.9 Grievance Focal Points (GFPs) The GFPs will be literate people from each community that will assist and facilitate the community members in reporting grievances resulting from project activities. The GFPs will be provided training by the PMU/PIC in facilitating grievance redress. Two GFPs (a female and male) will be selected for project area. 13.10 Role and Responsibilities of PCC The responsibilities of the PCC are: a. The PCC will log complaint and date of receipt onto the complaint database and inform the PIC and the Contractor; b. The PCC will instruct contractors and PIC to refer any complaints that they have received directly to the PCC. Similarly, the PCC will coordinate with local government to “capture” complaints made directly to them; c. The PCC, with the PIC and the Contractor, will investigate the complaint to determine its validity, and to assess whether the source of the problem is due to project activities, and identify appropriate corrective measures. If corrective measures are necessary, PCC, through the PIC, will instruct the Contractor to take necessary action; d. The PCC will inform the Complainant of investigation results and the action taken; e. If complaint is transferred from local government agencies, the PCC will submit interim report to local government agencies on status of the complaint investigation and follow- up action within the time frame assigned by the above agencies; f. The PCC will review the Contractors response on the identified mitigation measures, and the updated situation; g. The PCC will undertake additional monitoring, as necessary, to verify as well as review that any valid reason for complaint does not recur. During the complaint investigation, the PCC should work together with the Contractor and the PIC. If mitigation measures are identified in the investigation, the Contractor will promptly carry out the mitigation. PIC will ensure that the measures are carried out by the Contractor. 13.11 GRM Steps and Timeframe Procedures and timeframes for the grievance redress process are as follows:  Stage 1: When a grievance arises, the affected person may contact directly with the contractor/operator and the project managerto resolve the issue of concern. If the issue is successfully resolved, no further follow-up is required;  Stage 2: If no ad hoc solution can be found, the affected person/s will submit an oral or written complaint to the PCC by themselves or through GRM entry points (the CFP, PIC, Contractor/Operator). For an oral complaint the PCC must make a written record. For each complaint, the PCC must investigate the complaint, assess its eligibility, and identify an appropriate solution. It will provide a clear response within five (5) working 120 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) days to the complainant PIC and Contractor. The PCC will, as necessary, through PIC; instruct the Contractor to take corrective actions. The PCC will review the Contractor’s response and undertake additional monitoring. During the complaint investigation, the PCC will work in close consultation with the Contractors, and the Supervising Engineer (during construction) and with the PMU representatives (during operation). The contractors during construction and the PIC during operation should implement the redress solution and convey the outcome to the PCC within seven (7) working days;  Stage 3: If no solution can be identified by the PCC or if the complainant is not satisfied with the suggested solution under Stage 2, the PCC will organize, within two (2) weeks, a multi-stakeholder meeting under the auspices of the PD-PMU, where all relevant stakeholders (i.e., the complainant, PIC, contractor/operator, relevant local government offices) will be invited. The meeting should result in a solution acceptable to all, and identify responsibilities and an action plan. The contractors during construction and the PIC during operation should implement the agreed-upon redress solution and convey the outcome to the PCC within seven (7) working days;  Stage 4: If the multi-stakeholder hearing process is not successful, the PCC will inform Project Steering Committee (PSC) accordingly, and the PSC will organize a special meeting to address the problem and identify a solution; and  Stage 5: If the affected people are still not satisfied with the reply in Stage 4, he or she can go through to local judicial proceedings. 13.12 Reporting The PCC will record the grievance, investige, and after subsequent actions, the results will e included in the monthly project progress reports. In the construction period and the initial operational period covered by loan covenants the project proponent will periodically report progress to the World Bank. This will include reporting of complaints and their resolution. 121 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) 14 INSTITUTIONAL ARRANGEMENTS AND COSTS 14.1 Management Set-up This institutional arrangement is for the implementation of Social Management Plan and is not Sub- project or basin specific. This arrangement is proposed for the overall BIWRMDP. On the level of Contractors, the responsibilities of each contractor shall be specific against contract awarded to him. Overall responsibility for implementation of Social Impacts Assessment and Management Plan will rest with the Project Management Unit (PMU), Balochistan Irrigation Department, Government of Balochistan headed by a Project Director (PD). The PMU will be supported y a Social Management Unit (SMU) for SIAMP implementation. 14.1.1 Social Management Unit The overall responsibility for the supervision of SIAMP implementation will rest with the Project Management Unit, headed by a Project Director. A Social Management Unit (SMU) shall be established having the key positions within the SMU including:  Senior Sociologist  Junior Sociologist 14.1.2 Monitoring And Evaluation The project will be subjected to both internal and external monitoring of the SIAMP and RPF implementation. Internal monitoring will be conducted by Baluchistan Irrigation Department and external monitoring will be assigned to an External Monitoring Agency (EMA) to be hired by the Irrigation Department. The EMA will be chosen among local consultants. Internal monitoring will be carried out routinely as part of the regular project management and their progress will be communicated to the World Bank through the quarterly project implementation reports. Indicators for the internal monitoring will be those related to process and immediate outputs and results. Specific monitoring benchmarks will be relavant to future resettlement plans under the RPF and the SIAMP, including, but not limited to the following,: a) Resettlement planning in line with RPF b) Information campaign and consultation with APs; c) Status of land acquisition, donation; and payments of land compensation; d) Status of tree cutting, compensation payment or replantation of new trees e) Compensation for affected structures and other assets; f) Relocation of APs; g) Functioning of GRM h) Publication consultation and participation i) Others External monitoring will be carried out twice a year, and its results will be communicated to the Irrigation Department and the World Bank. External Monitoring tasks include, but not limited to the following: a) Review and verify internal monitoring reports prepared; b) Identification and selection of impact indicators; c) Impact assessment through formal and informal surveys with the affected persons; d) Consultation with APs, officials, community leaders for preparing review report; and 122 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) e) Assess the resettlement efficiency, effectiveness, impact and sustainability, drawing lessons for future resettlement policy formulation and planning. The EMA will also assess the status of project affected vulnerable groups such as female- headed households, disabled/elderly and families below the poverty line. The following will be considered as the basis for indicators in monitoring and evaluation of the project: a) Socio-economic conditions of the APs in the post-resettlement period; b) Communications and reactions from APs on entitlements, compensation, options, alternative developments and relocation timetables etc.; c) Changes in housing and income levels; d) Rehabilitation of squatters; e) Valuation of property; f) Grievance procedures; g) Disbursement of compensation; and h) Level of satisfaction of APs in the post resettlement period. 14.1.3 SIAMP Implementation Management Cost Costs have been estimated for implementing SIAMP for the BIWRDProject. The estimates for the key SEMMP components are discussed below and summarised in the Table 11.1. Appropriate clauses will be added to the Construction Contract(s) to ensure a mechanism for compliance and for payment. 14.1.4 Staffing The cost including the salaries of the staff and logistics for the staffing of theinstitutions to be involved in the implementation of the SIAMP and RAPs is estimated as PKR would be required. The details are given in the following Table 13.1. Table 14.1: Approximate Budget for SEMMP & RAP Implementation Sr. Institution Staff Approximate Approximate No. Monthly Cost Project Period (PKR) Cost 1 PMU Junior Sociologist 200,000 12,000,000 (for 5 Years of the Project) 2 M&ECs Senior Sociologist 350,000 21,000,000 (for 5 Years of the Project) Two Junior 250,000 15,000,000 Sociologists/Community Organizers (COs) 3 PIC Senior Sociologist 350,000 21,000,000 (for 5 Years of the Project) Two Junior 250,000 15,000,000 Sociologists/Community Organizers (COs) 4 Contractor Community Liaison 350,000 8,400,000 (Depending on Officer awarded Contract Period) Human Resource Officer 350,000 8,400,000 Sub-total (PKR) 100,800,000 123 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Nursery Plantation against Every Tree Cut (Lump Sump in 2,500,000 PKR) External Monitoring (Lump Sump in PKR) 5,000,000 Total 113,800,000 Contigencies (Physical and Price) (25 +9 %) 36,992,000 Grand Total (PKR) 145,792,000 Grand Total in (USD) 13,88,495 14.1.5 Resettlement Cost The project cost is estimated based on the existing engineering design and the adoption of voluntary land donation by the communities. Some of the protective engineering works required by the communities in view of their land donations are included in the civil works costs. It is not reflected here. The above cost is a rough estimate for largely institutional staffing and tree plantation for the Year One schemes. For future resettlement cost under the RPF, the Government of Boluchistan has commited to the full financing of all land acquisition and resettlement costs to be estimated and included in future resetltment action plans. 124 | P a g e Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) ANNEXES Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-A [1/3] Annexure A: Terms of Reference (Tors) Resettlement Planning Preparation Water situation in Balochistan is acute as a whole. Balochistan often faces severe drought conditions and water availability is drastically reduced during extended droughts which lead to high marginality in income and livelihood means. The storage facilities are inadequate for both surface and ground water and the poor conditions of canal and water structures require urgent rehabilitation and regular maintenance. The lack of adequate water storage capacities, flood retention areas as well as flood protection embankments led to the experience of high damages. Urgent efforts and investments are required for rehabilitation of its water infrastructure, water conservation and retention of flood water. The Government of Balochistan now has proposed to adopt an Integrated Water Resources Management approach to address the above challenges. The government has requested financial support from the World Bank for the Balochistan Integrated Water Resources Management and Development Project. The project consists of the following four components: Component-A: supports setting up the IWRM Process which will include community mobilization and training for the formation of Farmers Organizations. Component-B: includes implementation of No-Regret Sub-projects such as irrigation, potable water supply, farm tracks and basic services Sub-projects. Component-C: includes activities like (i) improve watershed management, rainwater harvesting and water storage schemes, rangeland and forestry management; (ii) rehabilitate and construct irrigation schemes (large, small and minor); (iii) strengthen flood and drought management; (iv)develop micro- hydropower and other water productivity schemes; (v) improve agriculture technologies; and (vi) improve basic services. Component – D: is on program Management, Monitoring & Evaluation (M&E), and Studies. Assignment Objective The majority of the likely candidate investments are expected to be of rehabilitation or strengthening nature. They would follow a community driven approach in their identification, selection and construction. New civil works are likely to be included as well. These investments will have their footprints on the ground and may require land taking for their rehabilitation, widening and construction, particularly in the case of new schemes, thus likely to have an impact on the land losing communities and households. The objective of this assignment is to carry out required upfront planning activities to ensure that the project complies with Pakistani laws and regulations related to land acquisition and the World Bank policy on involuntary resettlement in its planning and implementation. Project Planning Approach and Assignment Tasks The project will follow a programmatic approach in the final selection, detailed design and implementation of the project investment activities. For the first batch of schemes to start implementation in Year One, their selection and detailed design will be completed as part of the project preparation, including screening of possible land taking and development of their necessary social environmental mitigation measures before the World Bank appraisal of the project. The rest of the project investment activities will be selected and designed during the course of project implementation. Accordingly, resettlement planning will also follow a two-prong approach. For the Batch One investment activities to start implementation in Year One; resettlement planning will be carried out and necessary mitigation measures will be designed. These will be documented in the form of a Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-A [2/3] Resettlement Action Plan (RAP) or other appropriate titles. This will be completed before project appraisal. For the rest of the investment activities, a two-step approach will be adopted for resettlement planning. First, a Resettlement Policy Framework (RPF) will be developed before project appraisal. Second, RAPs will be prepared in line with the RPF as part of the investment activity design during the course of project implementation. This assignment is to complete the social part of the project preparation for the World Bank appraisal. The specific tasks are i) complete the social part of resettlement planning for Year One investment and develop RAPs, if necessary, and ii) develop a RPF for the rest of the investment activities. Scope of Work under this Assignment This assignment will carry out the following activities for the above two tasks. Resettlement planning for Year One investment activities will included, but not limited, to the following activities: Developing a socioeconomic profile of the population of the selected schemes areas, based on the basin level social assessment. Carrying out inventory surveys of project impacts including impacts on land and other properties legally owned or owned without title. These need to be quantified and properly documented. Designing necessary mitigation measures, including compensation in cash, in kind and possible “contribution” practice as brought out in the social assessments. Formulation of entitlement provisions, if resettlement and compensation measures are felt as necessary. In case of suggestions for land owner “contribution”, formulate principles, procedure, necessary documentation requirements. Implementation arrangements including budgeting, institutions and monitoring are to made. Designing a Grievance Redress Mechanism Preparing a resettlement action plan or different titled document in case of land contribution For the rest of the project investment program, a Resettlement Policy Framework will be developed. A draft resettlement policy framework has already been developed. The consultant will review the framework, revise and update it. Planning Methodology This assignment will be carried out through a combination of desk reviews, particularly of the basin level social assessment and social impact assessment, and field surveys. The field surveys will employ a combination of the following tools. Mapping and Baseline Data Collection–The mapping identifies the extents, situation and overall types in the target area exhibiting the land, community, resources and impacts in general. The data must identify all potentially affected people, structures, assets and resources in terms of land acquisition and development of the proposed project. Tools and Techniques for Data Collection – A number of tools and techniques may be used like Consultation Meeting, Questionnaire, In-depth-interview (IDI) and Focus Group Discussion (FGD), accordingly. Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-A [3/3] An inventory of losses by the proposed project has to be established by identifying, marking, measuring and registering of the losing assets. The above planning activities should be carried out in consultative and participatory process, closely involving local communities and other stakeholders. Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [1/41] Annexure B: Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) SOCIO-ECONOMIC BASELINE CONDITIONS Village Profile Study Code District Tehsil UC Village Reg. No. District Name Tehsil Name UC Name Village Urban Rural Interviewer’s Name ______________________________________ Interviewer’s Code Name of the Respondent ______________________________________ Father’s Name of the Respondent ______________________________________ CNIC No. of the Respondent ____________________________________ - - Date of Interview: DD/MM/YYYY Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [2/41] Section 1: 1. Estimated population of the village (No.) 1. Compact 2. Village type (housing) 2. Clustered 3. Scattered 3. Total houses and households in the village (No.) Houses ____________ Households __________ 1. Villagers’ Composite Environment Sr. Ethnic Groups Occupation No. of Religion HHs No. (Tribe / Caste / Clan) Primary Secondary 1. 2. 3. 4. 5. 6. Languages spoken in the village 1. 2. 3. 4. 5. 6. 7. Other (Pls. specify)________ 7. Transport facility from village to nearby town 1. Van/Pickup ___ 2. Truck/Bus _____ 3. Car/Jeep _____ 4. Motor cycle ____ 5. Other (Specify) _________ 8. Distance from village to Main Road 1. Up to ½ Km 2. Above ½ km to 1 km 3. Above 1 km to 2 km 4. Above 2 km 2. Community structures in the village. Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [3/41] Covered Area Sr. No. Identification Total (sq. ft.) 1. Masjid 2. Guest House 3. Graveyard 4. Micro Hydropower Plant 5. Irrigation Channel 6. Other (specify): Section 3: Health Facilities Sr. Identification Provided by Number No. 1. Hospital 1. Government 2. NGO 3. Private 4. Other (Pls. specify) ______________ 2. Rural Health Center 1. Government 2. NGO 3. Private 4. Other (Pls. specify) ______________ 3. Basic Health Unit 1. Government 2. NGO 3. Private 4. Other (Pls specify) ______________ 4. Dispensary 1. Government 2. NGO 3. Private 4. Other (Pls. specify) ______________ Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [4/41] 5. Maternity Home 1. Government 2. NGO 3. Private 4. Other (Pls. specify) ______________ 6. Quack 7. Hakeem 8. Homeopathic Clinic 1. Government 2. NGO 3. Private 4. Other (Pls. specify) ______________ 9. Midwifery 1. Government 2. NGO 3. Private 4. Other (Pls. specify) ______________ 10. Medical Store 11. Others (Pls. specify) 1. Government 2. NGO 3. Private 4. Others ______________ Section 4: Educational Facilities Sr. Identification Provided by Number No. 1. Boys Primary School 1. Government 2. NGO 1. 3. Private 2. ______________ 4. Other(Pls. spcify) 2. Girls Primary School 1. Government 2. NGO 3. Private Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [5/41] 4. Other (Pls. specify) ______________ 3. Masjid Maktab 1. Government 2. NGO 3. Private 4. Other (Pls. specify) ______________ 4. Boys Middle School 1. Government 2. NGO 3. Private 4. Other (Pls. specify) ______________ 5. Girls Middle School 1. Government 2. NGO 3. Private 4. Other ( Pls. spcify) ______________ 6. Boys High School 1. Government 2. NGO 3. Private 4. Other (Pls. specify) ______________ 7. Girls High School 1. Government 2. NGO 3. Private 4. Other (Pls. specify) ______________ 8. Boys College 1. Government 2. NGO 3. Private 4. Other (Pls. specify) ______________ 9. Girls College 1. Government 2. NGO 3. Private 4. Other (Pls. specify) ______________ Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [6/41] 10. Madrassa 1. Government 2. NGO 3. Private 4. Other (Pls. specify) ______________ 11. Other (Pls. specify) 1. Government 2. NGO 3. Private 4. Other (Pls. spcify) ______________ 12. Common diseases in the 1. Flu/ Fever Village 2. Malaria 3. Chicken pox 4. Typhoid 5. Diarrhea/ Dysentery 6. TB 7. Goiter 8. Jaundice Others (Pls. specify) Section 5: Utilities Sr. No. Identification Provided by Available Since (Year) 1. Electricity 3. 2. Telephone (PTCL/Cellular Network) 3. Post Office 4. Market/Shops 5. Police Station / Police Check Post 6. Bank 7. Link Road (km)________________ Pacca (km)__________________ Katcha (km)__________________ 8. Other (Pls. specify) __________ Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [7/41] 3. Water Supply Sources in the village. Sr. No. Type of Water Supply Structure Use of Water Supply Description Number Drinking/Irrigation 1. Dug Well 1 Drinking 2 Irrigation 2. Hand Pump 1 Drinking 2 Irrigation 3. Tube-Well 1 Drinking 2 Irrigation 4. Piped Water 1 Drinking 2 Irrigation 5. Water Tank 1 Drinking 2 Irrigation 6. Natural Spring 1 Drinking 2 Irrigation 7. Water Channel 1 Drinking 2 Irrigation 8. Nullah 1 Drinking 2 Irrigation 9. Other: 1 Drinking 2 Irrigation 4. Any ongoing humanitarian or development activities in the Village? 1. Yes 1. Is any NGO working in the village? 2. No 1. Health 2. If “Yes” to question 1, then their area of 2. Education interest. 3. Micro credit 4. Conservation of biodiversity 5. Others (Specify)___________ Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [8/41] 3. Currently, are there any major development projects in the village under implementation? 4. If “Yes” to question No. 3, then what are the social impacts of these projects? 1. Kanal 5. What are the prevalent units of 2. Acre measurement of agricultural land in 3. Other _____________ your village? 1. Kilogram 6. What are the prevalent units of 2. Munn (50 kg) measurement of agricultural produce in 3. Others ___________ your village? 1. Same village 7. Where do you people sell and buy their 2. Nearby town agriculture products and livestock? 3. Closer district 4. Other ___________ 1. Sardar/Tribal Head 8. Who are the influential in your village? 2. Community Elders Give Ranking from most influential 3. Religious Leader downward 1, 2 and so on 4. Local Govt. Councilors 5. Govt. Servants 6. MPA/MNA 7. Others __________ 1. Jirga 9. How the matters related to social and 2. Head of the Tribe property dispute as well as control and 3. Council of Ulemas consumption of the natural resources of 4. Heads of Families your village are settled? 5. Govt. Officials 6. Others ___________ 1. Yes 10. Is your village has share in Guzara 2. No forest? 1. Forest Department 11. If “Yes” to question 10, then who is 2. Tribal heads responsible for cutting the trees: 3. Community organizations Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [9/41] 4. Others ___________ 1. Forest Department 12. If “Yes” to question 10, then who is 2. Tribal heads responsible for the distribution of the 3. Others __________ forest income? 13. After how long forest income is distributed (Year/s) 14. How much share per house is _______________________ distributed (Rs.) ______________________ ______________________ 1. Permanent/Life Time 15. Is there any Migration in the village? If 2. Seasonal yes then what type of? 3. Others ___________ 1. 4 months 16. Duration of Migration 2. 6 months 3. 8 months 4. Others ___________ 1. Within the same area/district 17. Radius of Migration 2. Within the same province 3. Outside to other provinces 4. Others ___________ 18. Reasons of Out Migration? _______________________ ______________________ ______________________ 1. Yes 19. Do the floods affect your village? 2. No 20. If “Yes” to question 19, then provide _______________________ detail of the losses in the village ______________________ ______________________ 1. Yes 21. Are there any indigenous people 2. No residing in your village? Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [10/41] 22. If “Yes” to question 21, then provide details. 1. Yes 23. Is there any cottage industry in your 2. No village? 1. Wooden products 24. If “Yes” , then provide details 2. Handicrafts 3. Carpet weaving 4. Shawl making 5. Embroidery items 6. Others ___________ 5. In your opinion what can be done for the manpower development of your village by the project? ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ 6. What are the major social problems of your village? Proposed Solution (if No. Types of Problems any) 1. 2. 3. 4. 5. 1. Yes 6. Are you villagers are aware of the upcoming Balochistan 2. No Integrated Water Resources Management and Development Project in your area? Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [11/41] (If respondent is not aware of the project, brief him about the project.) 1. Yes 7. If “Yes” then do you know when the project will be started / 2. No implemented? 1. Employment 8. In your opinion what are the possible benefits of BIWRMDP? 2. Irrigation 3. Labor 4. Transportation 5. Other ____________ 1. Yes 9. Is there should be any grievance redresser mechanism under 2. No the project? 10. If “Yes” to question 9, then type of grievance redresser mechanism you propose from project side. 7. List other comments and information discussed on village and the project during the meeting / interview. ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ Signature: __________________ Signature: __________________ Name: __________________ Name: __________________ CNIC __________________ CNIC __________________ (Respondent) (Community Representative) Signature: __________________ Signature: __________________ Name: __________________ Name: __________________ CNIC __________________ CNIC __________________ Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [12/41] (Interviewer) (BIWRMDP/BID Representative) Dated: __________________ (Please attach few photographs of different location of the village, as per requirement) Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [13/41] BALOCHISTAN INTEGRATED WATER RESOURCES MANAGEMENT AND DEVELOPMENT PROJECT (BIWRMDP) SOCIO-ECONOMIC BASELINE CONDITIONS Household Profile (Sample Survey) Study Code District Tehsil Union Council Village/Hamlet HH Reg. No. District Tehsil UC Name Village Urban Rural Time Taken Interviewer’s Name ______________________________________ Interviewer’s Code Name of the Respondent ______________________________________ Father’s Name of the Respondent ______________________________________ NIC No. of the Respondent ______________________________________ Name of the Head of Household ______________________________________ CNIC No. of Head of Household ______________________________________ - - Date of Interview DD/MM/YYYY Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [14/41] Section 1: Basic Information of the Household Sr. No. Details Answers 1. Gender of Respondent 1. Male 2. Female 2. What is your approximate age? (Write in figures only) 3. Relation with Head of Household 1. Self 2. Father 3. Brother 4. Son Others (Please specify)__________ 4. Gender of the Head of Household 1. Male 2. Female 5. Tribe 6. What is the highest level of education you have 1. No education reached or completed? 2. Primary (up to 5 Years) 3. Secondary (up to 10 years) 4. High School (up to 12 Years) 5. University Other (Please specify)___________ 7. What is your Religion? 8. Settlement Status 1. Local 2. Migrated Settler Others (Please specify)__________ 9. If Migrated/Settler, Years of Settlement? 10. Reasons of Migration Section 2: Awareness Regarding the Project Sr. No. Details Answers 1. Are you aware of the upcoming Balochistan Integrated Water 1. Yes Resources Management and Development Project? 2. No (if respondent is not aware of the project, brief him about the project) 2. If “Yes” to question 1, do you k now when the project will be 1. Yes implemented? 2. No (if respondent is not aware of the project, brief him about the project implementation) Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [- 15 -/41] Section 3: Demographic Details Sr. Name of Head of Household No. of Family Gender CNIC No. Education Occu No. Members Level -pation Any Special Person (Yes/No) M F 1. - - 2. - - 3. - - 4. - - 5. - - 6. - - 7. - - 8. - - 9. - - 10. - - Gender: a. Male Education Level: a. Literate, b. Upto Primary, Occupation: a. Farming, b. Business, c. Handicraft, d. Artisan, b. Female c. Upto Matric, d. Graduate, e. Higher Education/Masters e. Skilled Works, f. Govt. Service, g. Private Service, h. Agriculture Labor, i. Livestock Grazing, j. Labor, k. Others (Specify) Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [16/41] Section 4 Available Facilities in the House Sr. Details Answers No. 1. Do you have Telephone Connection (landline)? 1. Yes 2. No 2. If “Yes” to question 1, when connected? 3. Is your house electrified? 1. Yes 2. No 4. If “Yes” to question 3, then mode of electricity 1. Self/Jointly arranged 2. Wapda 3. Others (Please specify) _____________ 5. Consumer name (as per electricity bill) 6. When connected: (Give dates as mm/dd/yyyyy) 7. Do you have sewerage System? 1. Yes 2. No . Section 5: Fuel Consumption in the House for illumination, cooking & heating Average Quantity Consumed Price Monthly (unit/ month) Source Type Units per Unit Expenditure (e.g. forest, market) (Rs) (Rs.) Winter Summer 1. Fuel wood 2. Electricity 3. LPG 4. Kerosene Other (Please specify)-------------------- ----------- Section 6: Social Issues Sr. Details Answers No. 1. Do married family members live with you in the same 1. Yes house? 2. No 2. Do you marry children outside your tribe? 1. Yes 2. No 3. If “Yes” to question 2, then 1. Out of clan Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [17/41] 2. Out of tribe 3. Out of District 4. Other (Please specify) _____________ 4. Number of child births in your family during last year 5. Were there any illnesses during the past 12 months? 6. For how long treatment continued (Months) 7. Place of treatment 8. Distance from village/hamlet (km) 9. Expenses incurred (Rs.) 10. Number of deaths in the family during last year 11. Cause/s of Death 1. __________________ 2. __________________ 3. __________________ 4. __________________ 12. Did you borrow money during the last year? 1. Yes 2. No 13. If “Yes” to question 12, provide details as below: Amount Sources Amount Yet to 1. Relative/friends Sr. No. Source Borrowed Purpose Return 2. NGO (Rs.) (Rs.) 3. Bank 4. Others (specify) 1. Purpose 1. Marriage 2. 2. Purchase of land 3. Purchase of built-up prpoerty 4. Establishment of business 3. 5. Others (Please specify) ___________________________ 14. Do you have to go to the city for fulfillment of various needs? 1. Yes 2. No 15. If “Yes” to question 14, then how offenly? 1. Daily 2. Weekly 3. Monthly 4. Occasionally 5. Others (Specify) ____________ Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [18/41] 16. If “Yes” to question 15, describe the needs/purpose? 1. Family/Relations 2. Market/Business/Trade 3. Access to KKH 4. Agriculture 5. Religious/Recreational 6. Educational/Health 7. Others (Specify) _____________ 17. Social issues of the community _________________________ _________________________ _________________________ _________________________ _________________________ Section 7: Livestock (Domestic Animals) 1. Number of Livestock heads of each type owned by you? Others Type Buffalo Cow Goat Sheep Oxen Calve Donkey Horse Chicken (Please specify) Number Value Rs./ Unit 2. From where do you get fodder for livestock? ________________________________ 3. Estimated cost for purchasing feed / fodder for your animals (Rs./Month) ? _________ Section 8: Livelihood 1. What is your occupation? 1. Primary 2. Secondary 2. What is your place of work? 1. Same village 2. Nearby Town 3. Nearby city 4. Others (Please specify) _________ 4. Involvement of household members in income earning activities. Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [19/41] Number of Persons Involved Sr. Activity Old Women Average No. Men Women Old Men Children (65 years Monthly (between (between (65 years (below 16 and above) Income 16-65) 16-65) and above) years) (Rs.) 1. Farming 2. Small Business 3. Handicraft 4. Artisan Services* 5. Skilled Works** 6. Govt. Service 7. Pvt.Service Agri. Labor 8. Permanent 9. Fisherman Livestock 10. Rearing 11. Labour Other (Pls. 12. specify)------------ -- Total *Artisans: Carpenter, Black-Smith, Barber, Potter, Shoe Menders/Maker, etc. **Skilled Workers: Tailor, Carpet Weaver, Stone Masonry, Plumber, Mechanic, Driver,Electrician, Furnisher, etc. 5. Average monthly expenditures? Sr. No. Detail Expenditures (Rs./Month) 1. Food Items 2. Firewood/ Energy Source 3. Education 4. Health 5. Social/Recreation Activities 6. Others (Please specify) Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [20/41] Section 9: Anticipated Losses by the Project 1. Due to acqusition of land by the project 1. Loss of residence anticipated losses to experience 2. Loss of cultivated land 3. Loss of trees (fruit/timber) 4. Loss of livelihood 5. Loss of private infrastructure 6. Loss of un-cultivated land 7. Loss of public infrastructure 1. Others (Please specify ) ________________ Section 10: Housing 1. Type of the ownership 1. Owned 2. Rented 3. Free 4. Others _______________ 2. Nature of the construction of the house 1. Pucca (Bricks/blocks/stones) 2. Semi Pucca 3. Katcha 4. Wood/Bamboo 5. Others (Pls. specify)__________________ 3. Number of rooms in the house 4. Availability of bathroom in the house? 1. Yes 2. No 5. Aproximate Plot size of the house Marla ________________ 6. Covered area (sq.ft) _______________________ 7. Year of construction of the house _________________________ 8. Estimated Replacement cost of the house (Rs.) _____________________________ 9. Do you have separate room/rooms for animals 1. Yes in your house? 2. No 10. If “Yes” to question 10.9, then number of rooms _____________________________ 11. Construction Type 1. Pucca (Bricks/blocks/stones) 2. Semi Pucca 3. Katcha Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [21/41] 4. Wood/Bamboo 5. Others (Pls. specify)_______ 12. Is your house being affected by the project? 1. Yes 2. No 13. If “Yes” to question 12, then do you have any 1. Yes other place of residence to move 2. No 14. If “Yes” to question 13, please specify Section 11: Land holding and land use by the household 1. Size of land holding with its approximate price? Approximate Overall Size of Land Perceived Approx. Sr. No. Land Use Land Perceived to be Unit Price (Kanals) Affected (Rs./Kanal) (Kanals) 1. Cultivated 2. Un-cultivated 3. Banjar jaded 4. Banjar qadeem 5. Ghair mumkin/pahar 6. Fruit orchard area Other (Please specify) 7. _______________ Total 8. Nature of farming 1. Owner 2. Contract 3. Owner cum tenant 4. Tenant 5. Share cropping 6. Others (Pls. specify)_____________ 9. Do you keep any written evidence of 1. Yes sale/purchase of your property? 2. No 10. If “Yes” to question 9, then type / nature of 1. Stamp paper evidence Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [22/41] 2. Plain paper 3. Personal evidence 4. Others (Pls. specify) ______________ 11. Which of the following agricultural implements 1. Plough for oxen do you have 2. Plough for tractor 3. Tractor 4. Spray machine 5. Trolley for tractor 6. Thresher 7. Other (Please specify)_____________ 12. What do you grow mostly in your agricultural land? Yield / Sr. No. Crop Area under Cultivation (Kanals) Kanal 1. Wheat 2. Maize 3. Vegetables 4. Fodder 5. Other (Pls. specify) ____________ 13. What are the expenditures to grow crops in your agricultural land? Unit Price Sr. No. Inputs Unit Quantity/ Season Seasonal Cost (Rs.) 1. Seeds Kgs/Kanal 2. Fertilizers Kgs/Kanal 3. Pesticides Liter/Kanal 4. Plowing No. 5. Harvesting days 6. Other (Please specify) Total 14. What is your average seasonal earning(Rs./Season)? a. Rabi b. Kharif Section 12: Trees Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [23/41] 1. Number & value of forest trees. Number Estimated Sr. Total Value Name of Species Size Value/Tree No. (Rs.) Overall Affected (Rs.) Small 1. Medium Large Small 2. Medium Large Small 3. Medium Large Small 4. Medium Large Small 5. Medium Large 2. Number & Income of fruit trees Number Annual Income Value of Timber Sr. No. Name of Specie Overall Affected (Rs.) (Rs.) 1. 2. 3. 4. 5. 6. 7. 8. Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [24/41] 9. 10. 11. 12. a. Amlok b. Hazelnut c. Pine nut d. Walnut e. Almond f. Peanut g. Apple h. Figs i. Peaches j. Apricot k. Pear l. Cherry m. Pomegranate n. Grapes o. Locat p. Date q. Alucha r. Oranges s. Olive t. Others____________ 3. Ornamental Plants Number Sr. Estimated Total Value Name of Specie Size Value/Tree No. (Rs.) Overall Affected (Rs.) Small 1. Medium Large Small 2. Medium Large Small 3. Medium Large Small 4. Medium Large Small 5. Medium Large Section 13: Commercial Assets Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [25/41] 1. How many shop(s) do you have to run your business (No.) ____________________ 2. Ownership status of the Shops: a. Owned b. Jointly Owned c. Rented d. Other (Pls. specify) 3. Type of Business (Economic Activity). Nature of Nature of Size of Plot Estimated Cost Economic Activity Number Business Construction* (Marla) (Rs) Grocery/ Karyana Store Petrol Pump Hotel/Motel/ Restaurant Dry fruit store Cobbler Black smith Grinding Unit (Chaki) Fruit / Vegetable Shop Auto Workshop Medical Store Butcher Shop Clinic/Hakeem PCO/Mobile phone Niswar Shop Gems and Jewelry store Cloth Merchandizer Tailoring Shop Fertilizer/Pesticide Other (Pls specify) _____ * Kacha, Semi Pacca, Pacca 4. For how many years you are running your business hers? ______________________ (Years) 5. What is the estimated value of your present stock in your shop? ___________________ (Rs.) 6. Persons working in your shops (No.) 7. Mode of payment of your goods & services 1. Cash payment 2. Deferred/credit payments 3. Kind 4. Any other (Pls. specify) _____________ Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [26/41] 8. Estimated average daily sale of goods / services (Rs.) 9. Average monthly profit (Rs./Month) 10. Is your commercial asset being affected by the 1. Yes project? 2. No 11. If “Yes” to question 10, then what is the ratio of 1. Less than 10% impact? 2. More than 10% less than 50% 3. More than 50% 4. Up to 100% Section 14: Livelihood and Income Income Earning Loss of Income Nature of Livelihood Percentage of loss (Rs./Month) (Rs./Month) Agriculture Livestock Business Jobs Share of Forest Labor Other (Pls. Specify) _______ Other (Pls. Specify)_______ 1. If your agricultural land /commercial asset are to be acquired for BIWRMDP, do you have any other sources of income? a. Yes b. No 1.1 If “Yes” specify the source. ______________________________________________ 2. In case of relocation, where will you prefer to resettle? a. Shifting to other village/UC b. Project developed resettlement site c. Within the tehsil d. Within the district e. Out of province f. Don’t know g. Any other place (Please specify) ______________ 3. What mode of compensation for land will be your choice? a. Cash b. Alternate Land c. Other (Please specify) ___________ Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [27/41] 4. If cash payments are made, then expected utilization of the money? a. Business b. Property c. Agricultural Land d. Others (Please specify) 15. What do you suggest for livelihood restoration? 16. Any suggestions regarding relocation and resettlement process? 17. Any suggestions regarding other area development schemes? Signature: __________________ Signature: __________________ Name: __________________ Name: __________________ CNIC No. __________________ CNIC No. __________________ (Respondent) (Community Representative) Signature: __________________ Signature: __________________ Name: __________________ Name: __________________ CNIC No. __________________ CNIC No. __________________ (Interviewer) (BIWRMDP/BID Representative) Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [28/41] Dated: __________________ Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [29/41] BALOCHISTAN INTEGRATED WATER RESOURCES MANAGEMENT AND DEVELOPMENT PROJECT (BIWRMDP) RESETTLEMENT SURVEY OF NARI / POLARI RIVER BASIN AREA INVENTORY OF AFFECTED COMMERCIAL STRUCTURES Study Code District Tehsil UC Village Structure/Asset District Name Tehsil Name UC Name Village Approximate Affected area (Marla/Kanals) Urban Rural Interviewer’s Name ______________________________________ Interviewer’s Code Name of Owner ______________________________________ Father’s Name of the Owner ______________________________________ Contact No. of the Owner _____________________________ Owner’s CNIC Name of the Respondent (In case, the owner is not available) ______________________________ Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [30/41] Father’s Name of Respondent ______________________________________ Respondent’s CNIC Contact No. of the Respondent _____________________________ 1. How many commercial structures do you have? 2. Ownership status of the commercial 1. Self owned structures 2. Joint 3. Rented 3. If your commercial assets are to be 1. Yes If no, acquired for the Project. Do you have 2. No Skip 4 any other source of income? 4. If Yes, then specify sources 5. What is the nature of your business? 1. Grocery/karyana store 2. Medical store 3. ClinicQuack/Hakeem 4. Hotel/Motel 5. Cloth/ Garments 6. Shoe store 7. Frtilizers/Pesticides 8. Grains/Flour shop 9. Fruit/ Vegetables 10. PCO/ Mobile shop 11. Gold smith 12. Black smith 13. Hotel 14. Auto workshops 15. Dry fruit store 16. Prescious stones 17. General store 18. Restaurant If Other, please specify ____________________ Q. 6 Size of plot, nature of construction and estimated cost of structure/s Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [31/41] Nature of Size of Construction 1. Katcha Covered Structure Plot Year of Estimated Cost 2. Pacca Area No. (Sq. 3. Semi Pacca Construction (Rs.) Remarks (Sq. ft.) ft.) 4. Wooden Cabin 1. 2. 3. 4. 7. For how many years you are running the business here? 8. Estimated value of present stock of goods and fixture in your ____________ structure/s (Rs.) 9. Estimated average daily sale of goods/ services of the shops (Rs.) ____________ 10. Average profit in a month (Rs. Per Month) ____________ 11. Do you need any type of assistance by the project? 1. Yes 2. No 12 If yes, then type of assistance do you expect from the project? ____________ ____________ 13 Do you have empolyes working in your busniss? 1. Yes 2. No 14 For how long these empolyes are working with you? _________ 15. If yes to 13, then give following information Sr. Pay (Rs. Name Father Name Adress CNIC No. No. per month) 1. 2. 3. 4. 5. Comments of the Interviewer _________________________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ Signature _______________________ Signature ____________________ Name __________________________ Name _______________________ CNIC __________________________ CNIC _______________________ Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [32/41] (Owner/Respondent) (Community Representative) Signature _______________________ Signature ____________________ Name __________________________ Name _______________________ CNIC __________________________ CNIC _______________________ (Interviewer) (BIWRMDP/BID Representative) Date _______________ (Please attach 4-5 photographs of the house, clearly showing façade, various parts of the house reflecting type of construction.) Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [33/41] BALOCHISTAN INTEGRATED WATER RESOURCES MANAGEMENT AND DEVELOPMENT PROJECT (BIWRMDP) RESETTLEMENT SURVEY OF NARI / POLARI RIVER BASIN AREA INVENTORY OF PUBLIC AND COMMUNITY STRUCTURES Study Code District Tehsil UC Village Structure/Asset District Name Tehsil Name UC Name Village Urban Rural Interviewer’s Name ______________________________________ Interviewer’s Code Name of Respondent ______________________________________ Father’s Name of Respondent ______________________________________ Respondent’s CNIC No. - - Date of Interview DD/MM/YYYY Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [34/41] Contact No. of Respondent _____________________________ 1. Affected Public infrastructure in the Village/Area coming in ROW Sr. No. Assets No. Area Construction Type Estimated / Unit (Kanals) 1. Katcha Cost 2. Pacca (Rs.) 3. Semi Pacca 1. Schools 2. Hospital/BHU/Dispensary 3. Police Station/Checkpost 4. Suspension bridges 5. Road/Track 6. Offices 7. Electric poles 8. Telecommunication Poles 9. Access Road to Settlements 10. Any other (specify) 2. Community structure in the Village/Area coming in RoW Sr. No. Assets No. Area Construction Estimated / Unit (Kanals) Type Cost 1. Katcha (Rs.) 2. Pacca 3. Semi Pacca 1. Mosques 2. Rest houses/Hujra 3. Electric poles 4. Micro Hydropower Plants 5. Hand Pump/Tubewell 6. Any other (specify) 4. Other Communal Structures/Assets coming in ROW Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [35/41] Sr. No. Assets No. Area Construction Estimated / Unit (Kanals) Type Cost 1. Katcha (Rs.) 2. Pacca 3. Semi Pacca 1. Forest/Orchard 2. Play Grounds 3. Grazing Lands 4. Springs/Kareze 5. Any other (specify) 5. Graveyards Number of graveyards going to be affected in the village/Area No. of graves affected in the graveyards Comments of the Interviewer: _________________________________________________________________________________ Signature _______________________ Signature ____________________ Name __________________________ Name _______________________ CNIC __________________________ CNIC _______________________ (Respondent) (Community Representative) Signature _______________________ Signature ____________________ Name __________________________ Name _______________________ CNIC __________________________ CNIC _______________________ (Interviewer) (BIWRMDP/BID Representative) Date _______________ (Please attach 4-5 photographs of the house, clearly showing façade, various parts of the house reflecting type of construction.) Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [36/41] BALOCHISTAN INTEGRATED WATER RESOURCES MANAGEMENT AND DEVELOPMENT PROJECT (BIWRMDP) RESETTLEMENT SURVEY OF NARI / POLARI RIVER BASIN AREA INVENTORY OF AFFECTED RESEDENTIAL STRUCTURES Study Code District Tehsil UC Village Structure/Asset Section 1: Identification District Name Tehsil Name UC Name Village Approximate Affected Area (Marla/Kanal) Urban Rural Interviewer’s Name ______________________________________ Interviewer’s Code Name of the Owner ______________________________________ Father’s Name of the Owner ______________________________________ Owner’s CNIC Name of Respondent (In case, the owner is not available/present) ___________________________________ Father’s Name of the Respondent ______________________________________ Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [37/41] Respondent’s CNIC # Contact No. of the Respondent _____________________________ 1. What is the Gender? 1. Male 2. Female 2. What is the your level of Education? 1. Illiterate 2. Quranic Literate/Madrasa 3. Under Primary 4. Primary 5. Middle 6. Matric 7. FA 8. Graduate 9. Above graduate/Masters 3. What is your occupation? 4. Relationship with Head of Household (HH) 1. Self 2. Father 3. Brother 4. Son If Other, please specify __________________ 5. Are you aware that implementation of 1. Yes Balochistan Integrated Water Resources 2. No Mangement and Development Project is starting shortly? 6. Is your homestead land/house likely to be 1. Yes affected by the Project? 2. No 7. Are you willing to give land free of cost for 1. Yes BIWRMDP development? 2. No SECTION 2: AGRICULTURE 9. In your opinion, How much your land will be affected due to the development of BIWRMDP? Description Cultivated Land Un-cultivated Land Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [38/41] (Kanals) (Kanals) Approximate Banjar Cultivable Barani Irrigated Forest Price (Rs.) /Barani Waste Total Affected 10. What is the nature/type of your farming? 1. Owner 2. Owner cum tenant 3. Tenant 4. Contract 5. Share cropper If other, please specify 11. Yields and Income of Major Crops Cultivated Land Yield Total (Kanals) (Kgs / Kanal) Rate Income Crop Irrigated Barani Irrigated Barani (Rs/40Kgs) K+R K R K R K R K R (Rs.) Wheat Maize Vegetables Others K= Kharif (Maize, Millets, Vegetables) R= Rabi (Wheat, Vegetables) 12. What type of fruit trees, forest trees and ornamental plants would be affected by the BIWRMDP land acquisition? Fruit Trees Forest Trees *Name Fuel Sr. Fruit Fruit Estimated Sr. (give codes wood Estimated No. Age Bearing Bearing Cost No. Girth Name given in the Cost Cost /or not /or not (Rs.) (ft.) row below) (Rs.) (Rs.) 1-5 5-10 >10 1. 1. 2. 2. 3. 3. 4. 4. 5. 5. 6. 6. Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [39/41] 7. 7. 8. 8. 9. 9. 10. 10. 11. 11. 12. 12. 13. Sub Total: 14. Ornamental Plants 15. 1. 16 2. 17 3. 18 4. 19 5. 20 6. Sub Total: Sub Total: Grand Total: *1. Deodar, 2. Kail, 3. Spruce, 4. Fir, 5. Chir Pine, 6. Junipers, 7. Brich, 8. Cupresis, 9. Thuja, 10. Wild Willow, 11. Olea Cuspidate, 12. Populus, 13. Platanus Oriental, 14. Robini, 15. Elegnus, 16. Herbal plants, 17. Eucalyptus, 18. Ailanthus, 19. Robinia 20. Oak. Please give codes for others from 20 onward Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [40/41] SECTION 3: HOUSING 13. Size of the residential plot owned, type of construction and estimated cost of the house? Ownership Area of the House 1. Single Shelter Type of Replacement Estimated Sr. 2. Joint Covered Rooms / Cattle Year of Construction Total Cost (Rs./sq. Total Cost Remarks No. 3. Others Area (Sq. (No.) Sheds Construction (Marla) ft.) (Rs.) (Please ft.) (No.) specify) 1. Katcha Pacca (Bricks/ 2. Blocks/ Stones) 3. Semi Pacca Wood / 4. Bamboo Others (Please 5. specify) Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [41/41] 14. Coordinates of the house: (N __________________________) (E __________________________) 15. Elevation of the house (ASL) ____________________ meters 16. What facilities are available in your 1. Electricity house? 2. Septic tank/sewerage system 3. Kitchen 4. Bathroom 5. Water supply If others, please specify _______________ 17. Sources of water for drinking 1. Water supply 2. Water channel 3. Nullah 4. Spring If other, please specify ________________ 18. Sources of water for animals: 1. Water channel 2. Nullah 3. Spring If other, please specify ________________ 19. What types of other structures will be affected in your house? Status 1. Katcha 2. Pacca 3. Semi Estimated Sr. Area Infrastructures Number Pacca Cost Remarks No. (sq. ft.) Others (Rs.) ( Please specify) i. Water tank ii. Power generator room iii. Hand pumps ___ (No.) iv. Drains/Drainage /Sewerage ____ (ft.) v. Any Other SECTION 4: RELOCATION 20. Do you have any other place of 1. Yes residence to move? 2. No 21. In case of relocation, what will be your 1. Shifting to other area preference of relocation? 2. Site developed by BID/BIWRMDP 3. Nearby Town 4. Within the District 5. Other District 6. Don’t know Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [42/41] If other, please specify __________________ 22. Please identify suitable relocation sites in the area if you know 23. If you have a prafered area do you own 1. Yes that land? 2. No 24. If “No” to 23 then, if the host community 1. Yes willing to sell their land 2. No 25. Do you expect assistance from the 3. Yes If no, Project for relocation? 4. No Skip 26 26. If yes, then what kind of assistance do __________________ you want? __________________ __________________ __________________ 27. Perceived impacts of the project Sr. No. Impact on …….. Type Remarks 1. Improved 2. Same 3. Worse 4. Don’t know i. Livelihood ii. Quality of Housing iii. Quality of Health iv. Education v. Basic Amenities vi. Access to social/ cultural structures 28. Do you want that your affected land 1. Yes If no, should be compensated with land? 2. No Skip 29 29. If yes, then location of the compensated land 30. What mode of compensation for land 1. Cash would you expect from the Project? 2. Alternate land 3. Free of cost as donation If other, please specify ___________________ 31. If cash is selected, then expected 1. Establish business utilization pattern of the money: 2. Purchase property 3. Purchase agriculture land If other, please specify ____________________ Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-B [43/41] Comments of the Interviewer _________________________________________________________________________________ _________________________________________________________________________________ Signature_______________________ Signature____________________ Name__________________________ Name_______________________ CNIC__________________________ CNIC_______________________ (Respondent) (Community Representative) Signature _______________________ Signature____________________ Name __________________________ Name _______________________ CNIC __________________________ CNIC _______________________ (Interviewer) (BIWRMDP/BID Representative) Date:_______________ (Please attach 4-5 photographs of the house, clearly showing façade, various parts of the house reflecting type of construction.) Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-C [1/19] Annexure C: List of Water & Land Shareholders of Gundacha Branch List of Water/Land Shareholders Jano Goth Gundacha Branch Sources of Income Sr. Name of Water/Land Approximate Family Size Land share Father’s Name Tribe/Clan No. Shareholder (in acres) Primary Secondary Tertiary Total Male Female 1 Abdul Haq Haji Yaqoob Roonja 13 5 8 14 Agriculture Livestock Labours 2 Alam Khan Muhammad Hassan Roonja 11 6 5 4 Agriculture Livestock Labours 3 Haji Ahmad Haji Siddiq Roonja 9 3 6 10 Agriculture Livestock Labours 4 Muhammad Saleh Ibrahim Roonja 14 8 6 10 Agriculture Livestock Labours 5 Abdullah Ghulam Nabi Roonja 10 6 4 4 Agriculture Livestock Labours 6 Abdul Karim Muhammad Siddiq Roonja 13 7 6 6 Agriculture Livestock Labours 7 Muhammad Anwar Ghulam Muhammad Roonja 8 4 4 10 Agriculture Livestock Labours 8 Sardar Mehrullah Rasool Bux Mengal 15 7 8 12 Agriculture Business Business 9 Ghulam Muhammad Abdullah Roonja 12 7 5 2 Agriculture Livestock Labours Total 105 53 52 72 List of Water/Land Shareholders Faqir Goth Gundacha Branch Land share Sources of Income Sr. Name of Water/Land Approximate Family Size Father’s Name Tribe/Clan (in acres) No. Shareholder Primary Secondary Tertiary Total Male Female 1 Muhammad Yousuf Yar Muhammad Faqir 11 4 7 1 Agriculture Livestock Labour 2 Allah Din Yar Muhammad Faqir 9 3 6 1 Agriculture Livestock Labour 3 Boora Shah Suleman Shah Syed 10 5 5 1 Agriculture Livestock Labour Total 30 12 18 3 List of Water/Land Shareholders Mitha Goth Gundacha Branch Sources of Income Sr. Name of Water/Land Approximate Family Size Land share Father’s Name Tribe/Clan No. Shareholder (in acres) Primary Secondary Tertiary Total Male Female 1 Abdul Ghafoor Abdul Rehman Bandija 22 10 12 10 Agriculture Livestock Lbour 2 Muhammad Slaeh Haji Ishaq Bandija 18 9 9 16 Agriculture Livestock Lbour Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-C [2/19] 3 Abdul Ghani Muhammad Musa Bandija 15 8 7 18 Agriculture Livestock Lbour 4 Mitha Khan Usman Bandija 4 3 1 5 Agriculture Livestock Lbour 5 Abdul Qadir Muhammad Khan Bandija 14 8 6 7 Agriculture Livestock Lbour 6 Ishaq Raboo Bandija 4 2 2 6 Agriculture Livestock Lbour 7 Mula Musa Haji Piri Channal 3 2 1 4 Agriculture Livestock Lbour 8 Nasir Abdul Khaliq Bandija 9 5 4 6 Agriculture Livestock Lbour 9 Jumma Ali Muhammad Bandija 4 1 3 5 Agriculture Livestock Lbour 10 Baboo Mula Abdullah Bandija 9 6 3 7 Agriculture Livestock Lbour 11 Ghulam Hyder Mitha Khan Bandija 7 2 5 1 Agriculture Livestock Lbour Total 109 56 53 85 List of Water/Land Shareholders Rodini Goth Gundacha Branch Approximate Family Land Sources of Income Size share (in Sr. Name of Water/Land acres) No. Shareholder Father’s Name Tribe/Clan Total Male Female Primary Secondary Tertiary 1 Abdul Karim Muhammad Siddiq Ridini 16 8 8 10 Agriculture Livestock Labour 2 Abdul Rehman Muhammad Siddiq Ridini 12 6 6 4 Agriculture Livestock Labour 3 Abdul Hakim Muhammad Siddiq Ridini 8 4 4 4 Agriculture Livestock Labour Total 36 18 18 18 List of Water/Land Shareholders Siapad Goth Gundacha Branch Approximate Family Size Land share (in Sources of Income acres) Sr. Name of Water/Land No. Shareholder Father’s Name Tribe/Clan Total Male Female Primary Secondary Tertiary 1 Muhammad Hassan Muhammad Ishaq Siapad 12 7 5 2.5 Agriculture Livestock Labour 2 Muhammad ibrahim Ghulam Hussain Siapad 16 8 8 2.5 Agriculture Livestock Labour 3 Muhammad Ismail Saleh Muhammad Siapad 9 4 5 1 Agriculture Livestock Labour 4 Ahmad Khan Saleh Muhammad Siapad 10 3 7 1 Agriculture Livestock Labour Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-C [3/19] 5 Mian Khan Omar Siapad 14 9 5 1 Agriculture Livestock Labour 6 Muhammad Ibrahim Ghulam Hassan Siapad 16 8 0 3 Agriculture Livestock Labour 7 Abdul Hai Haji Hassan Roonja 10 4 6 5 Agriculture Livestock Labour 8 Abdul Aziz Abdul Razzaq Deerya 12 9 3 5 Agriculture Livestock Labour Total 99 52 39 21 List of Water/Land Shareholders Warwari Goth Gundacha Branch Approximate Family Size Land share (in acres) Sources of Income Sr. Name of Water/Land No. Shareholder Father’s Name Tribe/Clan Total Male Female Primary Secondary Tertiary 1 Imam Bux Muhammad Bux Bandijo 13 7 6 4 Agriculture Livestock Labour 2 Muhammad Ismail Muhammad Bux Bandijo 9 4 5 3.5 Agriculture Livestock Labour 3 Sharif Muhammad Haroon Bandijo 8 4 4 12 Agriculture Livestock Labour 4 Imam Bux Muhammad Bux Bandijo 6 1 5 8 Agriculture Livestock Labour 5 Muhammad Karim Muhammad Bux Bandijo 11 7 4 8 Agriculture Livestock Labour 6 Muhammad Usman Muhammad Hassan Bandijo 9 6 3 14 Agriculture Livestock Labour 7 Allah Dino Ghulam Muhammad Bandijo 12 5 7 10 Agriculture Livestock Labour 8 Muhammad Alam Soomar Bandijo 18 7 11 6 Agriculture Livestock Labour 9 Ghulam Qadir Muhammad Hayat Bandijo 10 6 4 3 Agriculture Livestock Labour 10 Muhammad Yousuf Faqir Muhammad Bandijo 9 5 4 14 Agriculture Livestock Labour 11 Ghulam Nabi Muhammad Hashim Bandijo 13 7 6 10 Agriculture Livestock Labour 12 Muhammad Khan Haji Bandijo 11 8 3 10 Agriculture Livestock Labour 13 Muhammad Karim Muhammad Bux Bandijo 8 4 4 3 Agriculture Livestock Labour 14 Imam Bux Muhammad Bux Bandijo 6 2 4 8 Agriculture Livestock Labour 15 Latif Shah Habib Shah Syed 7 3 4 8 Agriculture Livestock Labour Total 150 76 74 121.5 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-C [4/19] List of Water/Land Shareholders Faizwani Goth Gundacha Branch Land Sources of Income Sr. Name of Water/Land Approximate Family Size Father’s Name Tribe/Clan share (in No. Shareholder acres) Primary Secondary Tertiary Total Male Female 1 Muhammad Ali Abdullah Bandija 25 12 13 10 Agriculture Livestock Labour 2 Soomar Khan Abdullah Bandija 15 8 7 8 Agriculture Livestock Labour 3 Khan Muhammad Muhammad Slaeh Bandija 8 3 5 8 Agriculture Livestock Labour 4 Muhammad Hamza Muhammad Hassan Bandija 16 9 7 10 Agriculture Livestock Labour Total 64 32 32 36 List of Water/Land Shareholders Kadwani Goth Gundacha Branch Approximate Family Sources of Income Sr. Name of Water/Land Size Land share Father’s Name Tribe/Clan No. Shareholders (in acres) Primary Secondary Tertiary Total Male Female 1 Saleh Muhammad Qadir Bux Sian 15 8 7 15 Agriculture Livestock Labour 2 Muhammad Khan Qadir Bux Sian 16 9 7 4 Agriculture Livestock Labour 3 Atta Muhammad Sher Muhammad Sian 8 3 5 6 Agriculture Livestock Labour 4 Taj Muhammad Qadir Bux Sian 9 4 5 16 Agriculture Livestock Labour 5 Qadir Bux Taj Muhammad Sian 6 2 4 6 Agriculture Livestock Labour 6 Ghulam Hyder Gul Muhammad Sian 17 8 9 6 Agriculture Livestock Labour 7 Muhammad Ibrahim Muhammad Hassan Sian 10 4 6 12 Agriculture Livestock Labour 8 Abdullah Khan Allah Dina Sian 15 5 10 4 Agriculture Livestock Labour Total 96 43 53 69 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-C [5/19] List of Water/Land Shareholders Mula Ishaq Goth Gundacha Branch Approximate Family Size Sources of Income Sr. Name of Water/Land Land share Father’s Name Tribe/Clan No. Shareholder Total Male Female (in acres) Primary Secondary Tertiary Total Male Female 1 Ali Muhammad Muhammad Hussain Khaskheli 15 7 8 3 Agriculture Livestock Labour 2 Haji Haji Jaffar Khaskheli 8 3 5 5 Agriculture Livestock Labour 3 Muhammad Saleem Suleman Khaskheli 10 2 8 15 Agriculture Livestock Labour 4 Muhammad Bux Muhammad Hussain Khaskheli 5 1 4 2 Agriculture Livestock Labour 5 Abdul Ghani Muhammad Soomar Bapra 4 2 2 15 Agriculture Livestock Labour 6 Abdul Majeed Mula Ishaq Bapra 5 3 2 10 Agriculture Livestock Labour 7 Abdul Rauf Mula Ishaq Bapra 20 8 12 10 Agriculture Livestock Labour 8 Muhammad Hussain Thouhar Chatta 12 6 6 4 Agriculture Livestock Labour 9 Muhammad Ismail Abdullah Chatta 8 4 4 2 Agriculture Livestock Labour 10 Muhammad Hussain Gul Muhammad Sian 12 6 6 50 Agriculture Livestock Labour 11 Mir Muhammad Allah Dita Sian 10 6 4 25 Agriculture Livestock Labour Total 109 48 61 141 List of Water/Land Shareholders Omar Goth Gundacha Branch Approximate Family Size Sources of Income Sr. Name of Water/Land Land share Father’s Name Tribe/Clan No. Shareholder (in acres) Total Male Female Primary Secondary Tertiary Wadera Muhammad 18 10 8 19 1 Omar Muhammad Bux Bandijo Agriculture Livestock Labour 2 Muhammad Ismail Muhammad Bux Bandijo 15 5 10 10 Agriculture Livestock Labour 3 Ghulam Qadir Muhammad Bux Bandijo 13 7 6 8 Agriculture Livestock Labour 4 Qazi Abdullah Muhammad Afzal Roonja 14 11 3 4 Agriculture Livestock Labour 5 Abdul Razzaq Allah Dino Bandijo 16 5 11 5.5 Agriculture Livestock Labour Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-C [6/19] 6 Jam Kamal Khan Jam Yousuf Jam Ilyani 8 3 5 6 Agriculture Livestock Labour 7 Latif Shah Habib Shah Syed 14 8 6 3.5 Agriculture Livestock Labour 8 Muhammad Ibrahim Ghulam Hassan Siapad 9 5 4 2 Agriculture Livestock Labour 9 Taj Muhammad Unknown Baloch 21 8 13 2.5 Agriculture Livestock Labour 10 Ali Muhammad Hassan Khan Siapad 17 6 11 6 Agriculture Livestock Labour 11 Abdul Majeed Abdul Aziz Siapad 17 9 8 4 Agriculture Livestock Labour 12 Mian Khan Omar Siapad 15 6 9 2 Agriculture Livestock Labour 13 Muhammad Hayat Muhammad Rozi Siapad 17 7 10 2 Agriculture Livestock Labour 14 Abdul Hameed Abdul Jabbar Sian 11 4 7 2 Agriculture Livestock Labour 15 Muhammad Kazim Muhammad Hashim Roonja 14 3 11 8 Agriculture Livestock Labour Total 219 97 122 84.5 List of Water/Land Shareholders Yaqoob Goth Gundacha Branch Land Sr. Name of Water/Land Approximate Family Size share (in Sources of Income Father’s Name Tribe/Clan No. Shareholder acres) Total Male Female Primary Secondary Tertiary 1 Muhammad Yaqoob Noor Muhammad Sian 16 8 8 16 Agriculture Livestock Labour 2 Muhammad Azeem Muhammad Yaqoob Sian 6 3 3 12 Agriculture Livestock Labour 3 Ahmadullah Dur Muhammad Sian 8 3 5 18 Agriculture Livestock Labour 4 Muhammad Iqbal Ahmad Khan Sian 6 2 4 10 Agriculture Livestock Labour 5 Ghulam Rasool Ahmad Khan Sian 5 3 2 4 Agriculture Livestock Labour 6 Yaseen Ibrahim Motak 9 5 4 12 Agriculture Livestock Labour 7 Abdul Rauf Muhammad Ishaq Bapar 7 3 4 10 Agriculture Livestock Labour 8 Abdul Haq Haji Yaqoob Roonja 12 7 5 10 Agriculture Livestock Labour 9 Alam Khan Muhammad Hassan Roonja 7 5 2 50 Agriculture Livestock Labour 10 Qadir Bux Abdul karim Sian 12 7 5 6 Agriculture Livestock Labour 11 Mir Muhammad Dawood Sian 7 4 3 6 Agriculture Livestock Labour 12 Muhammad Hassan Abdul Wakil Khaskheli 7 3 4 4 Agriculture Livestock Labour Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-C [7/19] Total 102 53 49 158 List of Water/Land Shareholders Omar Goth Gundacha Branch Approximate Family Size Land share Sources of Income Sr. Name of Water/Land Father’s Name Tribe/Clan (in acres) No. Shareholder Total Male Female Primary Secondary Tertiary Haji Muhammad 11 5 6 5 1 Muhammad Haroon Hassan Bandija Agriculture Livestock Labour Haji Muhammad 7 3 4 5.6 2 Allauddin Hassan Bandija Agriculture Livestock Labour Haji Muhammad 6 3 3 60 3 Ahmad Khan Hassan Bandija Agriculture Livestock Labour 4 Ghulam Muhammad Muhammad omar Bandija 8 4 4 4 Agriculture Livestock Labour 5 Muhammad Rahim Lal Muhammad Bandija 10 2 8 7 Agriculture Livestock Labour 6 Muhamad Siddiq Muhammad Qasim Bandija 10 4 6 10 Agriculture Livestock Labour 7 Fateh Muhammad Muhammad Qasim Bandija 12 7 5 10 Agriculture Livestock Labour 8 Muhammad Rahim Haji Wali Muhammad Bandija 9 3 6 52 Agriculture Livestock Labour 9 Haji Ahmad Ibrahim Chanal 8 1 7 18 Agriculture Livestock Labour 10 Abdul Khaliq Ismail Sheikh 15 8 7 12 Agriculture Livestock Labour 11 Suleman Jurekh Lango 13 7 6 16 Agriculture Livestock Labour 12 Hussain Gul Muhammad Sasoli 7 4 3 10 Agriculture Livestock Labour 13 Dr.Abdul Haq Haji Yaqoob Roonja 8 5 3 170 Agriculture Livestock Labour 14 Jam Kamal Jam yousuf Jam 8 5 3 80 Agriculture Livestock Labour Total 132 61 71 459.6 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-C [8/19] LIST OF WATER & LAND SHAREHOLDERS ON JAMOT BRANCH Approximate Family Size Land Sources of Income Sr. Name of Water/Land share (in No. Shareholder Father’s Name Tribe/Clan Total Male Female acres) Primary Secondary Tertiary 1 Ghulam Abdullah khaskeli 21 10 11 12 Agriculture Livestock Labour 2 Dr .siddiq H. ahmed Roonja 15 8 7 12 Agriculture Livestock Labour 3 Jan muhammad Kunoo Roonja 12 6 6 6 Agriculture Livestock Labour 4 Syed Hussain shah syed 9 5 10 Agriculture Livestock Labour 5 Juman shah Aloo shah syed 17 13 4 3 Agriculture Livestock Labour 6 M.Yousaf Ahmed Khan Bandija 10 6 4 2 Agriculture Livestock Labour 7 H.syed Khan Roonja 13 7 6 3 Agriculture Livestock Labour 8 Wali Muhammad Muhammad Ali Roonja 10 6 4 4 Agriculture Livestock Labour 9 Ali Shah Ibrahim Shah syed 12 8 4 10 Agriculture Livestock Labour 10 Sardar Mehrullah Rasool Bux Mengal 8 5 3 8 Agriculture Livestock Labour 11 Saleh Ibrahim Shah Roonja 13 5 8 6 Agriculture Livestock Labour 12 M.hashim Muhammad Hussain Roonja 8 5 3 6 Agriculture Livestock Labour 13 Allah Dina Barad Roonja 10 4 6 3 Agriculture Livestock Labour 14 M.Azeem Ghulam Muhammad Khaskeli 13 6 7 3 Agriculture Livestock Labour 15 Raza Muhammad Swali Khaskeli 15 6 9 3 Agriculture Livestock Labour 16 Adam Bachaya Roonja 12 7 5 4 Agriculture Livestock Labour 17 Syed Janib Shah Ibrahim Shah Syed 11 7 4 4 Agriculture Livestock Labour 18 Syed Jeem Shah Hassan Shah syed 9 6 3 6 Agriculture Livestock Labour 19 Muhammad Ameen Khaskeli 7 5 2 3 Agriculture Livestock Labour 20 Abdul Majeed Ahmed Roonja 12 5 7 8 Agriculture Livestock Labour 21 Haji Adal Haji Muhammad Roonja 10 6 4 5 Agriculture Livestock Labour 22 Sardar Mehrullah Rasool bux Mengal 9 6 3 30 Agriculture Livestock Labour 23 Mitha Khan Siddiq Khaskeli 15 7 8 1.5 Agriculture Livestock Labour 24 Abdul Jabbar Roonja 13 8 5 20 Agriculture Livestock Labour 25 Mitha Khan Siddiq Khaskeli 15 9 6 7 Agriculture Livestock Labour 26 Abdul karim Khaskeli 12 8 4 16 Agriculture Livestock Labour 27 Qalandrani Mengal 7 4 3 6 Agriculture Livestock Labour 28 Shafi H.Muhammad Hashim Bandijo 16 9 7 8 Agriculture Livestock Labour Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-C [9/19] 29 Haji Adal Haji Muhammad Roonja 9 6 3 7 Agriculture Livestock Labour 30 Sardar Mehrullah Rasool bux Mengal 11 6 5 8 Agriculture Livestock Labour 31 Ahmad Khan Muhammad urs Roonja 15 7 8 3 Agriculture Livestock Labour Total 369 201 164 227.5 List of Water/Land Shareholders Chatta Goth Jamot Branch Approximate Family Size Land Sources of Income Sr. Name of Water/Land Total Male Female share (in No. Shareholder Father’s Name Tribe/Clan acres) Primary Secondary Tertiary 1 Syed Abdullah Shah Yasoo Shah Syed 8 5 3 16 Agriculture Livestock Labour 2 Saleh Muhammad Gangoo Mengal 10 6 4 12 Agriculture Livestock Labour 3 Dr. Azeem Roonja 12 7 5 20 Agriculture Business Business 4 ShahJahan Mehboob Shah syed 9 5 4 8 Agriculture Livestock Labour 5 Syed Latif Hyabib Shah Syed 20 15 5 8 Agriculture Livestock Labour 6 Miskeen Shah Syed 14 8 6 4 Agriculture Livestock Labour 7 Abdul Ghani Jumman Sian 12 7 5 6 Agriculture Livestock Labour 8 Muhammad Yousuf Ahmad Khan Bandija 13 8 5 10 Agriculture Livestock Labour 9 Taj Muhammad Qadir Bux Sian 13 9 4 8 Agriculture Livestock Labour 10 Jaylyani Roonja 12 5 7 16 Agriculture Livestock Labour 11 Jan Muhammad Ali Iliyani 8 3 5 16 Agriculture Business Business 12 Mir Muhammad Abdullah Baloch 9 5 4 12 Agriculture Livestock Labour Total 140 83 57 136 Approximate Family Size Land Sources of Income Sr. Name of Water/Land share (in No. Shareholder Father’s Name Tribe/Clan Total Male Female acres) Primary Secondary Tertiary 1 Haji Ibrahim khaskeli 5 3 2 12 Agriculture Livestock Labour 2 Muhammad Hassan Chanchar Jamot 19 11 8 8 Agriculture Livestock Labour 3 Muhammad Amin Usman Mengal 12 7 5 4 Agriculture Livestock Labour 4 Noor Shah Anwer Shah Syed 10 3 7 5 Agriculture Livestock Labour 5 Soomer jamot Haji Jamot 13 9 4 3 Agriculture Livestock Labour Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-C [10/19] 6 Muhamma Amin Usman Mengal 3 Agriculture Livestock Labour 7 Ali Muhammad Keithi Jamot 5 3 2 3 Agriculture Livestock Labour 8 Abdul Rahim Pota Jamot 7 3 4 12 Agriculture Livestock Labour 9 Muhammad Hassan Umer Bandija 10 6 4 12 Agriculture Livestock Labour 10 Muhammad Khan Abdulah Mengal 6 2 4 6 Agriculture Livestock Labour Total 87 47 40 68 Approximate Family Size Land Sources of Income share (in Sr. Name of Water/Land acres) No. Shareholder Father’s Name Tribe/Clan Total Male Female Primary Secondary Tertiary 1 Suleman Ibrahim Roonja 12 7 5 10 Agriculture Livestock Labour 2 M.Umer M.Bux Bandija 9 5 4 12 Agriculture Livestock Labour 3 Muhammad Yaqoob Musa Bandija 5 3 2 6 Agriculture Livestock Labour 4 Ghulam Din Musa Bandija 8 5 3 20 Agriculture Livestock Labour 5 Dr. Azeem Roonja 13 9 4 60 Agriculture Livestock Labour 6 Essa Jumman Khaskeli 5 1 4 3 Agriculture Livestock Labour 7 Jumma Mathoo Khaskeli 5 3 2 8 Agriculture Livestock Labour 8 Rozi Musafir Khaskeli 6 4 2 6 Agriculture Livestock Labour 9 Muhammad Bux Usman Khaskeli 12 8 4 3 Agriculture Livestock Labour 10 Abdul Sattar Karim Bux Mengal 11 6 5 8 Agriculture Livestock Labour Total 86 51 35 136 List of Water/Land Shareholders Lakko Goth Jamot Branch Approximate Family Size Land share Sources of Income (in acres) Sr. Name of Water/Land No. Shareholder Father’s Name Tribe/Clan Total Male Female Primary Secondary Tertiary 1 Muhammad Haroon Muhammad Yousuf Roonja 8 5 3 7 Agriculture Livestock Labour 2 Suleman ibrahim Roonja 11 7 4 12 Agriculture Livestock Labour 3 Allah bux Yaqoob Bandija 15 8 7 3 Agriculture Livestock Labour Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-C [11/19] 4 Ibrahim Baxhaya Roonja 12 7 5 4 Agriculture Livestock Labour 5 Abdul Jabbar Roonja 13 9 4 16 Agriculture Livestock Labour 6 Suleman ibrahim Roonja 8 5 3 60 Agriculture Livestock Labour 7 Muhammad Sharif Muhammad Umer Khaskeli 25 18 7 12 Agriculture Livestock Labour 8 Muhammad Azeem Roonja 10 6 4 40 Agriculture Livestock Labour 9 Muhammad Rozi Muhammad Musa Roonja 13 7 6 18 Agriculture Livestock Labour 10 A.Rahman M. Ishaq siapad 7 5 2 5 Agriculture Livestock Labour 11 Muhammad Umer Muhammad Bux Bandija 9 5 4 8 Agriculture Livestock Labour 12 Muhammad Musa Haji Pir Muhammad Channal 6 4 2 3 Agriculture Livestock Labour 13 Muhammad Ameen Haji Gazzo Umrani 10 9 1 3 Agriculture Livestock Labour Total 147 95 52 191 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-C [12/19] LIST OF WATER & LAND SHAREHOLDERS OF HINGRI WEIR List of Water/Land Shareholders Chibb Haji Saleh Goth Hingri Weir Sources of Income Sr. Name of Water/Land Approximate Family Size Land share (in Father’s Name Tribe/Clan No. Shareholder acres) Primary Secondary Tertiary Total Male Female 1 Haji Atta Muhammad Muhammad Bachaya Roonja 13 3 10 12 Agriculture Livestock Labour 2 Gul Sher Zafarullah Roonja 10 4 6 16 Agriculture Livestock Labour 3 Ziaullah Muhammad Bachaya Roonja 15 4 11 12 Agriculture Livestock Labour 4 Sanaullah Dad Muhammad Roonja 10 4 6 6 Agriculture Livestock Labour 5 Yameen Dad Muhammad Roonja 9 5 4 6 Agriculture Livestock Labour 6 Abdul Rasheed Dad Muhammad Roonja 13 4 9 6 Agriculture Livestock Labour 7 Ahmad Muhammad Ayoub Roonja 7 4 3 9 Agriculture Livestock Labour 8 Ali Muhammad Bahna Roonja 11 4 7 7 Agriculture Livestock Labour 9 Saifullah Muhammad Barat Roonja 1 1 0 8 Agriculture Livestock Labour 10 Yehya Khan Muhammad Roonja 1 1 0 8 Agriculture Livestock Labour 11 Muhammad Anwar Gul Muhammad Roonja 5 2 3 6 Agriculture Livestock Labour 12 Muhammad Hayat Abdul Qadoos Roonja 9 4 5 6 Agriculture Livestock Labour 13 Muhammad Afzal Mir Muhammad Roonja 7 3 4 2 Agriculture Livestock Labour 14 Gul Muhammad Din Muhammad Roonja 11 6 5 9 Agriculture Livestock Labour 15 Muhammad Bux Muhammad Younus Roonja 8 3 5 9 Agriculture Livestock Labour 16 Muhammad Khan Muhammad Bachal Roonja 12 8 4 1 Agriculture Livestock Labour 17 Nazir Muhammad Din Roonja 9 4 5 6 Agriculture Livestock Labour 18 Imam Bux Gul Muhammad Roonja 13 7 6 2 Agriculture Livestock Labour 19 Aloo Ahsan Roonja 7 3 4 2 Agriculture Livestock Labour 20 Saleemullah Muhammad Ayoub Roonja 8 3 5 2 Agriculture Livestock Labour 21 Abdul Wahab Abdul Jalil Roonja 9 6 3 2 Agriculture Livestock Labour 22 Muhammad Imran Abdul Razzaq Roonja 15 9 6 2 Agriculture Livestock Labour 23 Muhammad Umar Muhammad Usman Roonja 9 5 4 2 Agriculture Livestock Labour 24 Muhammad Ali Zaheer Ahmad Roonja 18 10 8 20 Agriculture Livestock Labour Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-C [13/19] 25 Abdul Jabbar Muhammad Ramzan Roonja 13 8 5 19 Agriculture Livestock Labour 26 Munir Ahmad Muhammad Siddiq Roonja 13 5 8 10 Agriculture Livestock Labour 27 Ghous Bux Bhooro Roonja 11 6 5 10 Agriculture Livestock Labour TOTAL 267 126 141 200 List of Water/Land Shareholders Chibb Haji Saleh Goth HINGRI WEIR Land Sources of Income Sr. Name of Water/Land Approximate Family Size Father’s Name Tribe/Clan share (in No. Shareholder Primary Secondary Tertiary Total Male Female acres) 1 Hameedullah Muhammad Nawaz Roonja 15 7 8 60 Agriculture Livestock Labour 2 Aminullah Azeemullah Roonja 11 5 6 55 Agriculture Livestock Labour 3 Muhammad Shakir Muhammad Hassan Roonja 13 3 10 20 Agriculture Livestock Labour 4 Ilyas Muhammad Hassan Roonja 15 6 9 20 Agriculture Livestock Labour 5 Shaloo Muhammad Hassan Roonja 12 6 6 20 Agriculture Livestock Labour 6 Abdullah Muhammad Ishaq Roonja 12 3 9 4 Agriculture Livestock Labour 7 Ghulam Muhammad Muhammad Yar Roonja 16 6 10 4 Agriculture Livestock Labour 8 Abdul Haq Saleh Roonja 14 7 7 3 Agriculture Livestock Labour 9 Ghulamuddin Ghulam Nabi Roonja 13 2 11 4 Agriculture Livestock Labour 10 Rehmatullah Mehrullah Roonja 13 6 7 20 Agriculture Livestock Labour 11 Abdul Hakeem Muhammad Hassan Roonja 12 7 5 8 Agriculture Livestock Labour Muhammad 13 6 7 6 12 Jumman Muhammad Ramzan Roonja Agriculture Livestock Labour 13 Pir Muhammad Haji Mula Roonja 15 7 8 6 Agriculture Livestock Labour 14 Muhammad Ibrahim Muhammad Siddiq Roonja 15 4 11 6 Agriculture Livestock Labour 15 Muhammad Musa Haji Roonja 16 6 10 6 Agriculture Livestock Labour 16 Muhammad Yaqoob Roonja 17 7 10 8 Agriculture Livestock Labour Muhammad 17 7 10 8 17 Suleman Aloo Roonja Agriculture Livestock Labour Total 239 95 144 258 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-C [14/19] List of Water/Land Shareholders Chibb Haji Saleh Goth Hingri Weir Sources of Income Sr. Name of Water/Land Approximate Family Size Land share Father’s Name Tribe/Clan No. Shareholder (in acres) Primary Secondary Tertiary Total Male Female 1 Nawaz Ali Ghulam Muhammad Jamot 6 4 2 4 Agriculture Livestock Labour 2 Asghar Ghulam Muhammad Jamot 2 1 1 4 Agriculture Livestock Labour 3 Mehrullah Ghulam Muhammad Jamot 2 1 1 4 Agriculture Livestock Labour 4 Attaullah Ghulam Muhammad Jamot 1 1 0 4 Agriculture Livestock Labour 5 Amanullah Ghulam Muhammad Jamot 1 1 0 4 Agriculture Livestock Labour 6 Ramzan Sangar Jamot 15 5 10 20 Agriculture Livestock Labour 7 Usman Adam Barja 16 7 9 14 Agriculture Livestock Labour 8 Hassan Adam Barja 5 2 3 12 Labour Livestock Labour 9 Hussain Adam Barja 6 4 2 12 Labour Livestock Labour 10 Omar Adam Barja 5 2 3 12 Labour Livestock Labour 11 Khuda Rakia Ibrahim Roonja 8 3 5 60 Agriculture Livestock Labour 12 Amir Bux Abdul Karim Roonja 17 6 11 10 Agriculture Livestock Labour 13 Usman Unknown Roonja 10 5 5 50 Agriculture Livestock Labour 14 Ramoo Unknown Roonja 13 7 6 30 Agriculture Livestock Labour 15 Ramoo Adam Sian 8 5 3 25 Agriculture Livestock Labour 16 Azam Lakko Sian 9 4 5 12 Agriculture Livestock Labour 17 Babo Aloo Sian 7 5 2 25 Agriculture Livestock Labour 18 Hassan Mamoo Sian 9 5 4 40 Agriculture Livestock Labour Total 140 68 72 342 List of Water/Land Shareholders Achwani Goth HINGRI WEIR Approximate Family Size Land share (in acres) Sr. Name of Water/Land Sources of Income No. Shareholder Father’s Name Tribe/Clan Primary Secondary Tertiary Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-C [15/19] Total Male Female 1 Khuda Bux Muhammad Hassan Roonja 11 7 4 9 Agriculture Livestock Labour 2 Qadir Bux Sabir Roonja 10 6 4 14 Agriculture Livestock Labour 3 Noor Ahmad Sharo Roonja 13 7 6 8 Agriculture Livestock Labour 4 Mola Bux Shakir Roonja 17 9 8 10 Agriculture Livestock Labour 5 Shamoo Mamoon Roonja 11 4 7 13 Agriculture Livestock Labour 6 Rehmatullah Ghulam Roonja 13 6 7 16 Agriculture Livestock Labour 7 Panal Sharo Roonja 16 9 7 20 Agriculture Livestock Labour 8 Ibrahim Roonja 17 7 10 7 Agriculture Livestock Labour 9 Rasool Bux Ghulam Muhammad Roonja 15 6 9 5 Agriculture Livestock Labour Total 123 61 62 102 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-C [16/19] LIST OF WATER & LAND SHAREHOLDERS OF NURG WEIR List of Water/Land Shareholders Musani Goth Nurg Weir Approximate Family Size Land share Sources of Income Name of Water/Land (in acres) Sr. No. Shareholder Father’s Name Tribe/Clan Total Male Female Primary Secondary Tertiary 1 Abdul Hakeem Abdul Rasheed Roonja 13 5 8 25 Agriculture Livestock Labour 2 Muhammad Faraz Haji Qayyum Roonja 10 4 6 10 Agriculture Livestock Labour 3 Saad Muhammad Qazin Roonja 13 4 9 7 Agriculture Livestock Labour 4 Muhammad Ashraf Abdul Rasheed Roonja 16 4 12 12 Agriculture Livestock Labour 5 Inayatullah Muhammad Hashim Roonja 8 3 5 20 Agriculture Livestock Labour 6 Allah Bux Imam Bux Roonja 7 5 2 9 Agriculture Livestock Labour 7 Muhammad Omar Abdul Qadir Roonja 14 7 7 13 Agriculture Livestock Labour 8 Zaffar Muhammad Musa Roonja 11 4 7 11 Agriculture Livestock Labour 9 Saadullah Haji Muhammad Roonja 11 3 8 6 Agriculture Livestock Labour 10 Allah Dita Musa Roonja 9 6 3 4 Agriculture Livestock Labour 11 Fateh Muhammad Nooro Roonja 12 3 9 3 Agriculture Livestock Labour Total 124 48 76 120 List of Water/Land Shareholders Nimmani Goth Nurg Weir Land share Sources of Income Sr. Name of Water/Land Approximate Family Size Father’s Name Tribe/Clan (in acres) No. Shareholder Primary Secondary Tertiary Total Male Female 1 Muhammad Khan Hashim Roonja 13 5 8 15 Agriculture Livestock Labour 2 Sanaullah Abdul Rehman Roonja 7 3 4 5 Agriculture Livestock Labour 3 Idrees Yaqoob Roonja 9 4 5 5 Agriculture Livestock Labour 4 Sabir Hussain Ali Muhammad Roonja 12 6 6 12 Agriculture Livestock Labour 5 Allah Dina Qasim Roonja 8 3 5 20 Agriculture Livestock Labour 6 Muhammad Omar Qasim Roonja 7 5 2 10 Agriculture Livestock Labour 7 Muhammad Ibrahim Haji Mango Roonja 15 6 9 10 Agriculture Livestock Labour 8 Yameen Haji Mango Roonja 10 4 6 9 Agriculture Livestock Labour 9 Abdullah Hassan Roonja 6 3 3 5 Agriculture Livestock Labour Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-C [17/19] 10 Haji Azeem Haji Hamza Roonja 10 4 6 8 Agriculture Livestock Labour 11 Musa Haji Roonja 11 4 7 10 Agriculture Livestock Labour 12 Akbar Abdul Karim Roonja 7 3 4 10 Agriculture Livestock Labour 13 Asmat Abdul Rehman Roonja 12 5 7 15 Agriculture Livestock Labour 14 Muhammad Hassan Abdul Rehman Roonja 9 4 5 10 Agriculture Livestock Labour 15 Haji Ahmad Haji Musa Roonja 10 5 5 18 Agriculture Livestock Labour 16 Iqbal Essa Roonja 9 4 5 6 Agriculture Livestock Labour 106 47 59 111 TOTAL List of Water/Land Shareholders Moani Goth Nurg Weir Land Sources of Income Sr. Name of Water/Land Approximate Family Size Father’s Name Tribe/Clan share (in No. Shareholder Primary Secondary Tertiary Total Male Female acres) 1 Saad Kazim Roonja 15 8 7 80 Agriculture Livestock Labour 2 Abdul Jabbar Noor Muhammad Roonja 10 4 6 20 Agriculture Livestock Labour 3 Haji Hakeem Abdul Rasheed Roonja 9 5 9 35 Agriculture Livestock Labour 4 Abdul Jabbar Abdul Sattar Bandija 12 5 7 30 Agriculture Livestock Labour 5 Muhammad Usman Ahmad Roonja 8 3 5 7 Agriculture Livestock Labour 6 Ghous Bux Gul Muhammad Roonja 11 4 7 10 Agriculture Livestock Labour 7 Muhammad Omar Abdul Qadir Roonja 9 4 5 30 Agriculture Livestock Labour Total 74 33 46 212 List of Water/Land Shareholders Kechani Goth Nurg Weir Name of Approximate Family Size Land share Sources of Income Sr. Water/Land (in acres) No. Shareholder Father’s Name Tribe/Clan Total Male Female Primary Secondary Tertiary 1 Abdul Ghafoor Muhammad Yousuf Roonja 15 7 8 50 Agriculture Livestock Labour 2 Jumma Khan Muhammad Siddiq Roonja 13 7 6 12 Agriculture Livestock Labour 3 Muhammad Ismail Muhammad Hussain Khaskheli 11 6 5 4 Agriculture Livestock Labour 4 Dil Murad Usman Khaskheli 9 3 6 3 Agriculture Livestock Labour Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-C [18/19] 5 Muhammad Omar Sakhi Khaskheli 13 5 8 3 Agriculture Livestock Labour 6 Muhammad Sajjar Gul Muhammad Khaskheli 10 4 6 4 Agriculture Livestock Labour Total 71 32 39 76 List of Water/Land Shareholders Layyani Goth Nurg Weir Approximate Family Size Land share Sources of Income Sr. Name of Water/Land (in acres) No. Shareholder Father’s Name Tribe/Clan Total Male Female Primary Secondary Tertiary 1 Imam Bux Muhammad Sididq Khaskheli 8 4 4 20 Agriculture Livestock Labour 2 Abdul Sattar Muhammad Ayoub Khaskheli 12 7 5 20 Agriculture Livestock Labour Ghulam 10 4 6 12 3 Muhammad Sher Khan Khaskheli Agriculture Livestock Labour 4 Muhammad Sher Khan Khaskheli 11 5 6 12 Agriculture Livestock Labour 5 Faqir Muhammad Khamisa Khaskheli 8 3 5 12 Agriculture Livestock Labour 6 Wali Muhammad Sher Khan Khaskheli 8 3 5 13 Agriculture Livestock Labour 7 Mula Musa Sher Khan Khaskheli 13 5 8 20 Agriculture Livestock Labour 8 Ali Muhammad Yousuf Khaskheli 8 3 5 20 Agriculture Livestock Labour 9 Jumma Yousuf Khaskheli 9 3 6 20 Agriculture Livestock Labour 10 Dr.Abdul Haq Haji Yaqoob Roonja 12 6 6 12 Agriculture Livestock Labour 11 Sher Muhammad Ibrahim Roonja 11 5 6 12 Agriculture Livestock Labour Total 110 48 62 173 List of Water/Land Shareholders Ishaqani Goth Nurg WEIR Approximate Family Size Land Sources of Income share Sr. Total Male Female (in No. Name of Water/Land Shareholder Father’s Name Tribe/Clan acres) Primary Secondary Tertiary 1 Abdul Ghani Ibrahim Roonja 14 5 9 15 Agriculture Livestock Labour 2 Abdul Rasheed Ali Muhammad Roonja 16 6 10 10 Agriculture Livestock Labour 3 Muhammad Haroon Ismail Roonja 11 4 7 70 Agriculture Livestock Labour 4 Musa Allauddin Roonja 10 7 3 4 Agriculture Livestock Labour Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-C [19/19] 5 Ismail Abdullah Roonja 16 8 8 6 Agriculture Livestock Labour 6 Abdul Ghafoor Ahmad Khan Roonja 15 7 8 10 Agriculture Livestock Labour 7 Abdul Rasheed Ahmad Khan Roonja 17 9 8 12 Agriculture Livestock Labour 8 Ghulam Hussain Muhammad Siddiq Roonja 10 6 4 6 Agriculture Livestock Labour 9 Muhammad Omar Phata Roonja 11 6 5 6 Agriculture Livestock Labour 10 Abdul Latif Noor Muhammad Roonja 18 10 8 10 Agriculture Livestock Labour 11 Abdul Hameed Ali Muhammad Roonja 11 12 4 8 Agriculture Livestock Labour 12 Ghulam Rasool Bachal Roonja 15 6 9 25 Agriculture Livestock Labour 13 Sher Muhammad Allauddin Roonja 9 4 5 22 Agriculture Livestock Labour 14 Gul Muhammad Abdul Haq Roonja 10 5 5 10 Agriculture Livestock Labour 15 Sanaullah Muhammad Omar Roonja 13 7 6 8 Agriculture Livestock Labour 16 Hidayatullah Muhammad Omar Roonja 14 8 6 8 Agriculture Livestock Labour 17 Zainuddin Muhammad Hassan Roonja 11 7 4 6 Agriculture Livestock Labour 18 Shafi Muhammad Muhammad Siddiq Roonja 12 7 5 7 Agriculture Livestock Labour 19 Saifullah Muhammad Usman Roonja 16 8 8 8 Agriculture Livestock Labour 20 Ghulam Din Abdul Khaliq Roonja 17 7 10 7 Agriculture Livestock Labour 21 Bashir Ahmad Abdul Rahim Roonja 12 8 4 6 Agriculture Livestock Labour 22 Abdul Hameed Mehmood Roonja 11 4 7 6 Agriculture Livestock Labour Total 140 71 69 113 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-D [1/10] Annexure D: List of Water & Land Shareholders of Nimmi Sub-Project List of Water & Land Shareholders of Sher Muhammad Goth Approximate Family Size Land Sources of Income Sr. Name of Water/Land share (in No. Shareholder Father’s Name Tribe/Clan Total Male Female acres) Primary Secondary Tertiary 1 Sher Muhammad Muhammad Usman Mengal 13 6 7 10 Agriculture Livestock Labour 2 Ibrahim Mir Muhammad Mengal 9 4 5 7 Agriculture Livestock Labour 3 Ghulam Rasool Mir Muhammad Mengal 8 3 5 5 Agriculture Livestock Labour 4 Abdul Kabir Sher Muhammad Mengal 10 4 6 6 Agriculture Livestock Labour 5 Noor Muhammad Mir Muhammad Mengal 9 6 3 8 Agriculture Livestock Labour Total 49 23 26 36 List of Water & Land Shareholders of Jani Goth Approximate Family Size Land share Sources of Income Name of Water/Land (in acres) Shareholder Father’s Name Tribe/Clan Total Male Female Primary Secondary Tertiary Abdul Majeed Faiz Muhammad Bizenjo 9 6 3 9 Agriculture Livestock Labour Ibrahim Yaqoob Bizenjo 11 8 3 1 Labour Agriculture Labour Abdul Khaliq Abdari Bizenjo 15 8 7 3 Labour Agriculture Labour Majeed Abdullah Bizenjo 11 7 4 0 Labour Agriculture Labour Muhammad Rahim Mureed Bizenjo 8 3 5 2 Labour Agriculture Labour Ishaq Abdullah Bizenjo 5 2 3 5 Agriculture Livestock Labour Jumma Khan Mando Bizenjo 10 5 5 1 Agriculture Livestock Labour Muhammad Hamza Wali Muhammad Bizenjo 6 1 5 1 Labour Agriculture Labour Total 75 40 35 22 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-D [2/10] List of Water & Land Shareholders of Nimmi Bent Goth Approximate Family Size Land Sources of Income share Name of Water/Land Total Male Female (in Shareholder Father’s Name Tribe/Clan acres) Primary Secondary Tertiary Muhammad Hashim Qadir Bux Bizenjo 16 9 7 3 Agriculture Livestock Labours Ishaq Abdullah Bizenjo 7 4 3 4 Agriculture Livestock Labours Muhammad Sadiq Muhammad Saleh Bizenjo 9 5 4 4 Agriculture Livestock Labours Arif Abdul Rasool Bizenjo 17 9 8 4 Agriculture Livestock Labours Saifullah Allah Bux Bizenjo 10 5 5 5 Agriculture Livestock Labours Muhammad Muhammad Omar Bizenjo 30 15 15 4 Agriculture Livestock Labours Abdul Ghafoor Muhammad Sadiq Bizenjo 12 7 5 6 Agriculture Livestock Labours Abdullah Abdul Ali Bizenjo 3 1 2 2 Agriculture Livestock Labours Muhammad Sadiq Muhammad Saleh Bizenjo 9 5 4 2 Agriculture Livestock Labours Muhammad Hashim Qadir Bux Bizenjo 6 9 5 14 Agriculture Livestock Labours Hamza Mulla Wali Muhammad Bizenjo 6 2 4 2 Agriculture Livestock Labours Total 125 71 62 50 List of Land Shareholders of Sour Dir Goth Approximate Family Size Land share Sources of Income Sr. Name of Water/Land (in acres) No. Shareholder Father’s Name Tribe/Clan Total Male Female Primary Secondary Tertiary 1 Muhammad Abdul Rahim Bizenjo 16 4 12 2 Agriculture Livestock Labours 2 Ismail Saadullah Bizenjo 13 6 7 8 Agriculture Livestock Labours 3 Abdul Ghani Eido Khan Bizenjo 11 5 6 3 Agriculture Livestock Labours 4 Arif Abdul Rasool Bizenjo 8 3 5 4 Agriculture Livestock Labours Muhammad 11 5 6 6 5 Hussain Yar Muhammad Bizenjo Agriculture Livestock Labours 6 Ibrahim Ali Bizenjo 11 4 7 4 Agriculture Livestock Labours 7 Abdul Sattar Ghulam Muhammad Bizenjo 13 5 8 6 Agriculture Livestock Labours 8 Qasim Ali Muhammad Bizenjo 9 4 5 3 Agriculture Livestock Labours Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-D [3/10] 9 Ibrahim Jumma Bizenjo 9 3 6 3.5 Agriculture Livestock Labours 10 Abdul Rahim Khair Muhammad Bizenjo 8 4 4 8 Agriculture Livestock Labours 11 Ghulam Qadir Qulamin Sian 11 4 7 6 Agriculture Livestock Labours 12 Noora Ollansa Bizenjo 8 2 6 5 Agriculture Livestock Labours 13 Khan Muhammad Lal Muhammad Sian 12 5 7 4 Agriculture Livestock Labours 14 Jan Muhammad Lal Muhammad Sian 11 5 6 6 Agriculture Livestock Labours 15 Muhammad Alam Muhammad Sain Sian 10 5 5 4 Agriculture Livestock Labours 16 Hamza Muhammad Sian 4 1 3 6 Agriculture Livestock Labours 17 Abdul Rasool Muhammad Sian 13 5 8 5 Agriculture Livestock Labours 18 Sumar Ghulam Hussain Bizenjo 9 5 4 3 Agriculture Livestock Labours Total 187 75 112 86.5 List of Land Shareholders of Kundi Goth Approximate Family Size Land Sources of Income share (in Sr. Name of Water/Land Total Male Female acres) No. Shareholder Father’s Name Tribe/Clan Primary Secondary Tertiary 1 Mir Muhammad Pir Muhammad Sian 10 4 6 100 Agriculture Livestock Labours 2 Sher Muhammad Pir Muhammad Sian 6 3 3 11 Agriculture Livestock Labours 3 Ghulam Nabi Lashkar Khan Mengal 14 10 4 10 Agriculture Livestock Labours 4 Ghulam Mustafa Lashkar Khan Mengal 10 7 3 8 Agriculture Livestock Labours 5 Ghulam Qadir Lashkar Khan Mengal 8 4 4 6 Agriculture Livestock Labours 6 Wadood Abdul Rasool Bapra 3 2 1 4 Agriculture Livestock Labours 7 Muhammad Siddiq Saleh Muhammad Sian 10 4 6 3 Agriculture Livestock Labours 8 Ali Muhammad Essa Bapra 6 2 4 5 Agriculture Livestock Labours 9 Dur Muhammad Essa Bapra 12 8 4 21 Agriculture Livestock Labours 10 Muhammad Usman Mir Muhammad Sian 9 4 5 20 Agriculture Livestock Labours 11 Sher Muhammad Pir Muhammad Sian 6 3 3 4 Agriculture Livestock Labours 12 Muhammad Omar Mitha Khan Sian 8 3 5 10 Agriculture Livestock Labours Total 102 54 48 202 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-D [4/10] List of Land Shareholders of Langra Goth Approximate Family Size Land Sources of Income share (in Name of Water/Land acre) Primary Secondary Tertiary S# Shareholder Father’s Name Tribe/Clan Total Male Female 1 Muhammad Sadiq Haji Sarwar Muhammad Hassani 17 4 13 4 Agriculture Livestock Labour 2 Imam Bux Abdul Qadir Roonja 13 3 10 10 Agriculture Livestock Labour 3 Hussain Muhammad Hassan Baloch 12 5 7 5 Agriculture Livestock Labour 4 Ali Muhammad Sumar Baloch 9 3 6 12 Agriculture Livestock Labour 5 Abu Bakar Gulami Roonja 17 6 11 3 Agriculture Livestock Labour 6 Nadir Abdul Ghafoor Baloch 8 2 6 14 Agriculture Livestock Labour 7 Ghulam Mustafa Haji Usman Bizenjo 13 6 7 10 Agriculture Livestock Labour 8 Ghulam Rasool Ismail Bizenjo 6 4 2 2 Agriculture Livestock Labour 9 Pir Muhammad Sher Muhammad Baloch 21 9 12 15 Agriculture Livestock Labour 10 Noor Muhammad Sher Muhammad Baloch 20 7 13 3 Agriculture Livestock Labour 11 Abdullah Naqeeb Baloch 14 4 10 12 Agriculture Livestock Labour 12 Khuda Bux Jumma Baloch 13 3 10 2 Agriculture Livestock Labour 13 Yousuf Lakko Baloch 19 7 12 15 Agriculture Livestock Labour 14 Muhammad Edo Baloch 23 7 16 4 Agriculture Livestock Labour 15 Yar Muhammad Abdul Karim Baloch 10 3 7 4 Agriculture Livestock Labour 16 Muhammad Musa Khamisa Baloch 20 4 16 4 Agriculture Livestock Labour 17 Abdul Ghafoor Aziz Baloch 9 3 6 3 Agriculture Livestock Labour 18 Muhammad Qasim Abdullah Baloch 10 7 3 5 Agriculture Livestock Labour 19 Muhammad usman Pir Muhammad Doda 16 5 11 12 Agriculture Livestock Labour 20 Muhammad Bux Haji Sumar Muhammad Hassani 15 10 5 12 Agriculture Livestock Labour 21 Gul Khan Muhammad Saleh Bizenjo 14 7 7 1.5 Agriculture Livestock Labour 22 Muhammad Tariq Abdul Rehman Bizenjo 6 3 3 5 Agriculture Livestock Labour 23 Khalil-u-Rehman Khuda Bux Baloch 12 4 8 5 Agriculture Livestock Labour 24 Sarwar Muhammad Hayat Baloch 9 4 5 6 Agriculture Livestock Labour Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-D [5/10] 25 Essa Ibrahim Baloch 14 5 9 4 Agriculture Livestock Labour 26 Bhora Ibrahim Baloch 10 3 7 8 Agriculture Livestock Labour 27 Rasool Bux Qadir Bux Bizenjo 20 6 14 6 Agriculture Livestock Labour 28 Jumma Khan Muhammad Saleh Bizenjo 14 4 11 8 Agriculture Livestock Labour Total 384 138 247 194.5 List of Land Shareholders of Kishari Goth Approximate Family Size Land Sources of Income Sr. Name of Water/Land share No. Shareholder Father’s Name Tribe/Clan Total Male Female (in acres) Primary Secondary Tertiary 1 Khalil-u-Rehman Khair Muhammad Baloch 13 6 7 6 Agriculture Livestock Labour 2 Muhammad Hassan Muhammad Siddiq Baloch 13 7 6 4 Agriculture Livestock Labour 3 Muhammad Amin Usman Baloch 12 9 3 6 Agriculture Livestock Labour 4 Hussain Rasool Bux Baloch 6 3 3 4 Agriculture Livestock Labour 5 Abdul Rasheed Abdul Rahim Baloch 7 3 4 7 Agriculture Livestock Labour 6 Abdullah Suleman Baloch 9 4 5 8 Agriculture Livestock Labour 7 Wadera Mehmood Muhammad Omar Baloch 12 7 5 12 Agriculture Livestock Labour 8 Bashir Abdullah Baloch 11 6 5 13 Agriculture Livestock Labour 9 Abdul Aziz Noor Muhammad Baloch 12 8 4 8 Agriculture Livestock Labour 10 Khwaja Suleman Muhammad Khan Baloch 14 9 5 6 Agriculture Livestock Labour 11 Abdul Ghani Khizzer Baloch 9 3 6 5 Agriculture Livestock Labour 12 Muhammad Siddiq Hassan Baloch 9 5 4 3 Agriculture Livestock Labour 13 Abdul Ghafoor Abdul Rahim Baloch 7 4 2 2 Agriculture Livestock Labour 14 Ghulam Muhammad Abdul Karim Baloch 12 6 6 3 Agriculture Livestock Labour 15 Mula Majeed Ismail Baloch 16 8 8 4 Agriculture Livestock Labour 16 Abdul Salam Abdul Rahim Baloch 9 7 2 3 Agriculture Livestock Labour 17 Muhammad Shah Hussain Baloch 11 6 5 4 Agriculture Livestock Labour 18 Abdul Wahid Abdul Majid Roonja 8 2 6 4 Agriculture Livestock Labour 19 Muhammad Ibrahim Baloch 9 5 4 5 Agriculture Livestock Labour 20 Jam Akram Jam Khair Muhammad Roonja 15 8 6 11 Agriculture Livestock Labour Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-D [6/10] 21 Rehmatullah Ibrahim Roonja 11 4 7 4 Agriculture Livestock Labour 22 Ashraf Jumma Roonja 10 5 5 4 Agriculture Livestock Labour 23 Dr.Abdul Haq Haji yaqoob Roonja 15 7 8 30 Agriculture Livestock Labour 24 Ghulam Qadir Abdullah Baloch 13 8 5 8 Agriculture Livestock Labour 25 Tariq Abdul Rahim Baloch 12 7 5 4 Agriculture Livestock Labour 26 Rauf Taj Muhammad Roonja 15 9 6 5 Agriculture Livestock Labour 27 Omar Khair Muhammad Roonja 14 5 9 4 Agriculture Livestock Labour 28 Jam Kamal Jam Yousuf Jam 12 5 7 25 Agriculture Livestock Labour 29 Jam Murad Ali Jam Yousuf Jam 9 5 4 10 Agriculture Livestock Labour 30 Abdul Majeed Jam Yousuf Jam 10 5 5 7 Agriculture Livestock Labour 31 Haji Adal Haji Muhammad Roonja 10 3 7 7 Agriculture Livestock Labour 32 Muhammad Rahim Abdul Rahim Baloch 12 6 6 5 Agriculture Livestock Labour 33 Iqbal Jan Muhammad Baloch 9 5 4 5 Agriculture Livestock Labour 34 Swali Wali Muhammad Baloch 6 4 2 5 Agriculture Livestock Labour 35 Sardar Aslam Sardar Junaid Khan Jamot 7 2 5 4 Agriculture Livestock Labour 36 Ghulam Nabi Pir Muhammad Baloch 12 5 7 4 Agriculture Livestock Labour 37 Allauddin Muhammad Baloch 7 4 3 5 Agriculture Livestock Labour 38 Abdul sattar Suleman Baloch 9 7 2 4 Agriculture Livestock Labour 39 Abdul Ghaffar Suleman Baloch 8 2 6 4 Agriculture Livestock Labour 40 Ghulam Nabi Noor Muhammad Baloch 15 8 7 3 Agriculture Livestock Labour 41 Abdul Razzaq Abdul Qadir Baloch 9 5 4 3 Agriculture Livestock Labour 42 Ghulam Rasool Noor Muhammad Baloch 12 8 4 3 Agriculture Livestock Labour 43 Ghulam Ali Ghulam Qadir Baloch 10 6 4 3 Agriculture Livestock Labour 44 Ramzan Essa Baloch 11 7 4 3 Agriculture Livestock Labour 45 Ghulam Hyder Hussain Baloch 8 5 3 3 Agriculture Livestock Labour 46 Ghafoor Aziz Baloch 15 10 5 3 Agriculture Livestock Labour Total 495 263 230 283 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-D [7/10] List of Land Shareholders of Habib Goth Approximate Family Size Sources of Income Sr. Name of Water/Land No. Shareholder Father’s Name Tribe/Clan Total Male Female Primary Secondary 1 Muhammad Sharif Habib Siapd 9 5 4 Labour Livestock 2 Muhammad Hanif Habib Siapd 15 8 7 Labour Livestock 3 Gulam Muhammad Habib Siapd 13 9 4 Labour Livestock 4 Altab Hussan Sharif Siapd 7 5 2 Labour Livestock 5 Muhammad Irfan Sharif Siapd 8 6 2 Labour Livestock 6 Muhammad Imran Sharif Siapd 11 7 4 Labour Livestock 7 Gulam Qidar Gulam Muhammad Siapd 13 9 4 Labour Livestock 8 Nadir Gulam Muhammad Siapd 12 7 5 Labour Livestock 9 Qadir Bux Gulam Muhammad Siapd 9 4 5 Labour Livestock 10 Abdul Raheem Gulam Muhammad Siapd 7 4 3 Labour Livestock 11 Saliman Sharif Siapd 5 3 2 Labour Livestock 12 Muhammad Khan Juma Siapd 9 6 3 Labour Livestock 13 Abdul Gaffar Muhammad Khan Siapd 15 9 6 Labour Livestock 14 Nusr ullah Abdul Gaffar Siapd 8 5 3 Labour Livestock 15 Muhammad Saliman Juma Siapd 7 5 2 Labour Livestock 16 Muhammad Ayoub Muhammad Saliman Siapd 6 4 2 Labour Livestock 17 Muhammad Yousf Muhammad Saliman Siapd 11 7 4 Labour Livestock 18 Muhammad Raheem Muhammad Saliman Siapd 17 9 8 Labour Livestock 19 Muhammad Rafiq Muhammad Saliman Siapd 12 7 5 Labour Livestock 20 Wajeed Ali Muhammad Raheem Siapd 14 8 6 Labour Livestock 21 Abdul Nasir Muhammad Ayoub Siapd 8 5 3 Labour Livestock 22 Sajed Ali Muhammad Ayoub Siapd 7 5 2 Labour Livestock 23 Zakir Ali Muhammad Ayoub Siapd 9 4 5 Labour Livestock 24 Azgar Ali Muhammad Ayoub Siapd 5 3 2 Labour Livestock 25 Muhammad Khan Allah Bux Siapd 8 5 3 Labour Livestock 26 Ahmed Khan Allah Bux Siapd 11 9 2 Labour Livestock 27 Gulah Nabi Muhammad Khan Siapd 6 4 2 Labour Livestock Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-D [8/10] 28 Atta ullah Muhammad Khan Siapd 8 4 4 Labour Livestock 29 Sana Ullah Muhammad Khan Siapd 17 8 9 Labour Livestock 30 Ijaz Ali Muhammad Khan Siapd 13 5 8 Labour Livestock 31 Abdul Rasheed Muhammad Khan Siapd 10 7 3 Labour Livestock 32 Abdul Gani Rozi Siapd 11 5 6 Labour Livestock 33 Nazeer Ahmad Ahmad Khan Siapd 9 5 4 Labour Livestock 34 Naseer Ahmad Ahmad Khan Siapd 7 4 3 Labour Livestock 35 Abdul Sattar Abdul Ghani Siapd 6 5 1 Labour Livestock 36 Abdul Wahed Abdul Ghani Siapd 7 4 3 Labour Livestock 37 Qadir Bux Abdul Ghani Siapd 8 4 4 Labour Livestock 38 Muhammad Hayat Rozi Siapd 9 5 4 Labour Livestock 39 Abdul Hameed Muhammad Hayat Siapd 10 6 4 Labour Livestock 40 Abdul Rasheed Muhammad Hayat Siapd 12 5 7 Labour Livestock 41 Gulam Hider Muhammad Salah Siapd 8 5 3 Labour Livestock 42 Muhammad Ramzan Muhammad Salah Siapd 11 8 3 Labour Livestock 43 Qadir Bux Muhammmad Salah Siapd 15 9 6 Labour Livestock 44 Gulam Nabi Muhammad Salah Siapd 8 6 2 Labour Livestock 45 Sakindr Gulam Hidar Siapd 18 11 7 Labour Livestock 46 Yaseen Gulam Hidar Siapd 9 5 4 Labour Livestock 47 Waseem Gulam Hidar Siapd 11 7 4 Labour Livestock 48 Muhammad Raheem Abdul Raheem Siapd 4 2 2 Labour Livestock 49 Muhammad Hussan Muhammad Saddiq Siapd 5 3 2 Labour Livestock 50 Muhammad Musa Muhammad Saddiq Siapd 8 6 2 Labour Livestock 51 Abdul Raheem Abdul Raheem Siapd 7 4 3 Labour Livestock 52 Abdul Ghoffar Abdul Raheem Siapd 9 5 4 Labour Livestock 53 Abdul Razaq Abdul Raheem Siapd 10 7 3 Labour Livestock 54 Muhammad Rafiq Abdul Raheem Siapd 13 9 4 Labour Livestock 55 Mohin Khan Isaq Siapd 15 8 7 Labour Livestock 56 Qamir Din Mohin Khan Siapd 10 6 4 Labour Livestock 57 Muhammad Dawood Isaq Siapd 5 3 2 Labour Livestock 58 Abdul Wahid Dawood Siapd 7 5 2 Labour Livestock Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-D [9/10] 59 Abul Samad Dawood Siapd 10 4 6 Labour Livestock 60 Abdul Hakeem Dawood Siapd 8 5 3 Labour Livestock 61 Adul Haleem Dawood Siapd 11 6 5 Labour Livestock 62 Imam Bux Mohin Khan Siapd 16 9 7 Labour Livestock 63 Noor U Din Mohin Khan Siapd 12 8 4 Labour Livestock 64 Azghar U Din Mohin Khan Siapd 9 5 4 Labour Livestock 65 Abdul Kareem Dawood Siapd 7 5 2 Labour Livestock 66 Muhammad Khan Isaq Siapd 7 4 3 Labour Livestock 67 Jamil Ahmad Muhammad Khan Siapd 6 4 5 Labour Livestock 68 Khalil Ahmad Muhammad Khan Siapd 11 8 3 Labour Livestock 69 Shakil Muhammad Khan Siapd 17 11 5 Labour Livestock 70 Master Ahmed Khan Muhammad Isaq Siapd 10 8 5 Labour Livestock 71 Ijaz Ahmad Ahmad Khan Siapd 6 4 2 Labour Livestock 72 Ayaz Khan Ahmad Khan Siapd 5 3 2 Labour Livestock 73 Amtaz Ahmad Khan Siapd 7 5 2 Labour Livestock 74 Saif ullah Abdul Wahid Siapd 8 5 3 Labour Livestock 75 Safi Ullah Abdul Wahid Siapd 7 4 3 Labour Livestock 76 Sakindr Qamir Din Siapd 6 4 2 Labour Livestock 77 Nadir Qamir Din Siapd 5 3 2 Labour Livestock 78 Muammad Essa Muhammad Musa Siapd 9 5 4 Labour Livestock 79 Abdul Nabi Muhammad Essa Siapd 10 7 3 Labour Livestock 80 Abdul Qadir Muhammad Essa Siapd 11 5 6 Labour Livestock 81 Shakir Ali Muhammad Essa Siapd 13 7 6 Labour Livestock 82 Ahmad Khan Zar din Siapd 8 5 3 Labour Livestock 83 Maryam (W\O) Isaq Siapd 5 3 2 Labour Livestock 84 Zanib B B Muhammad Salah Siapd 4 2 2 Labour Livestock 85 Noori B B Muhammad Sadiq Siapd 7 5 2 Labour Livestock 86 Hawa b B Abdul Rahman Siapd 6 4 2 Labour Livestock 87 Suffran B B Habib Siapd 9 5 4 Labour Livestock Total 812 491 326 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-D [10/10] List of Land Shareholders of Ibrahim Siphad Goth Sr. Approximate Family Size Sources of Income No. Name of Water/Land Shareholder Father’s Name Tribe/Clan Total Male Female Primary Secondary Tertiary 1 Akbar Musa Siapd 3 1 2 Agriculture Livestock Labor 2 Ismial Salah Muhammad Siapd 3 2 1 Agriculture Livestock Labor 3 Ali Muhammad Huaseen Khan Siapd 4 2 2 Agriculture Livestock Labor 4 Imam Bux Hussani Siapd 12 7 5 Agriculture Livestock Labor 5 Allah Bux Hussani Siapd 15 9 6 Agriculture Livestock Labor 6 Abdul Majeed Aziz Siapd 5 3 2 Agriculture Livestock Labor 7 Ahmad Salah Muhammad Siapd 4 2 2 Agriculture Livestock Labor 8 Juma Gulam Muammad Siapd 4 3 1 Agriculture Livestock Labor 9 Saddiq Musa Siapd 5 2 3 Agriculture Livestock Labor 10 Rahmaan Allah Bux Siapd 8 5 3 Agriculture Livestock Labor 11 Mahiaa Khan Siapd 9 5 4 Agriculture Livestock Labor 12 Essa Saliman Siapd 12 8 4 Agriculture Livestock Labor 13 sajjad Ali Muhammad Ali Siapd 7 4 3 Agriculture Livestock Labor 14 Allah Bux Ismial Siapd 15 8 7 Agriculture Livestock Labor 15 Juma Khan Khuda Bux Siapd 10 6 4 Agriculture Livestock Labor 16 Imam Bux Ismial Siapd 7 5 2 Agriculture Livestock Labor 17 Muhammad Raheem Gulam Muammad Siapd 4 1 3 Agriculture Livestock Labor 18 Muhammad Bux Taj Siapd 7 4 3 Agriculture Livestock Labor 19 Taj Muhammad Mula Hamza Siapd 10 5 5 Agriculture Livestock Labor 20 Naeem Bilal Siapd 11 6 5 Agriculture Livestock Labor 21 Bilal Dad Muhammad Siapd 14 8 6 Agriculture Livestock Labor 22 Rasool Bux Umar Siapd 11 7 4 Agriculture Livestock Labor 23 Ibraheem Gulam Hussan Siapd 5 2 3 Agriculture Livestock Labor 24 Basheer Ahmed Gulam Rasool Siapd 7 4 3 Agriculture Livestock Labor 25 Abdul Rasool Rasool Bux Siapd 5 3 2 Agriculture Livestock Labor 26 Soomar Siapd 3 1 2 Agriculture Livestock Labor 27 Abul Raheem Isaq Siapd 3 2 1 Agriculture Livestock Labor 28 Abdul Haleem Muhammad Hussan Siapd 13 8 5 Agriculture Livestock Labor 29 Abdul Saleem Siapd 7 4 3 Agriculture Livestock Labor 30 Aamir Bux Siapd 8 5 3 Agriculture Livestock Labor 31 Rasool Bux Umar Siapd 9 6 3 Agriculture Livestock Labor Total 240 138 102 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-E [1/17] Annexure E: Loni Village (Nari Gorge) Land Size Name and father name of Width Sr.No. Scheme Channel Tribe Clan Lenth (in Jum leader (In (in feet) Acre) feet) Mohammad Anwar/ Rahim Nari 1 Khan Gorge Rahere Nullah.1. Loni Badozai 1312 15 0.45 Nari 2 Mohamad Usman/M.Khan Gorge Rahere Nullah.1. Loni Badozai 1611 15 0.55 Dr. Allah Dad/Mohammad Nari 3 Khan Gorge Rahere Nullah.1. Loni Badozai 1526 15 0.53 Abdul Razaq/Mohammad Nari 4 Khan Gorge Rahere Nullah.1. Loni Badozai 1706 15 0.59 Nari 5 Haji A. Rashid/ Mustafa Khan Gorge Rahere Nullah.1. Loni Badozai 1476 15 0.51 Total 7632 15 2.63 Nari 1 H.A.Rahman/Abdullah Khan Gorge Rahere Nullah.2. Loni Badozai 984 15 0.34 Nari 2 Abdul Aziz/Abdullah Khan Gorge Rahere Nullah.2. Loni Badozai 1312 15 0.45 Nari 3 Ezatullah/Mohd.Khan Gorge Rahere Nullah.2. Loni Badozai 1050 15 0.36 Nari 4 Obaidullah/H.Habibullah Gorge Rahere Nullah.2. Loni Badozai 1181 15 0.41 Nari 5 Kaleemullah/Misri Khan Gorge Rahere Nullah.2. Loni Badozai 1198 15 0.41 Total 5725 15 1.97 Nari 1 Edayatullah/Mahmood Khan Gorge Rella Nullah Loni Badozai 525 15 0.18 Nari 2 H.A.Rahman/Abdullah Khan Gorge Rella Nullah Loni Badozai 459 15 0.16 Nari 3 Kaleemullah/Misri Khan Gorge Rella Nullah Loni Badozai 443 15 0.15 Nari 4 Ameen Ullah/ H.A. Rahman Gorge Rella Nullah Loni Badozai 558 15 0.19 Nari 5 Ezatullah/Mohd.Khan Gorge Rella Nullah Loni Badozai 328 15 0.11 Nari 6 M.Yaqoob/M. Khan Gorge Rella Nullah Loni Badozai 591 15 0.20 Mohammad Anwar/ Rahim Nari 7 Khan Gorge Rella Nullah Loni Badozai 623 15 0.21 Total 3527 15 1.21 Dr. Allah Dad/Mohammad Nari 1 Khan Gorge Bagh Nullah 1. Loni Badozai 492 15 0.17 Haji Rashid Khan/Mustafa Nari 2 Khan Gorge Bagh Nullah 1. Loni Badozai 427 15 0.15 Nari 3 Mohamad Usman/M.Khan Gorge Bagh Nullah 1. Loni Badozai 361 15 0.12 Nari 4 Dr. Ismail/Mohammad Khan Gorge Bagh Nullah 1. Loni Badozai 459 15 0.16 Nari 5 Ezatullah/Mohd.Khan Gorge Bagh Nullah 1. Loni Badozai 394 15 0.14 Nari 6 Obaidullah/H.Habibullah Gorge Bagh Nullah 1. Loni Badozai 591 15 0.20 Nari 7 M.Yaqoob/M. Khan Gorge Bagh Nullah 1. Loni Badozai 705 15 0.24 Total 3429 15 1.18 Nari 1 Mohammad Khan/A.Satar Gorge Bagh Nullah 2. Loni Badozai 820 15 0.28 Nari 2 Farooq/Mohammad Afzal Gorge Bagh Nullah 2. Loni Badozai 656 15 0.23 Mohammad Anwar/ Rahim Nari 3 Khan Gorge Bagh Nullah 2. Loni Badozai 984 15 0.34 Nari 4 M. Yousaf/ H.A.Rahim Gorge Bagh Nullah 2. Loni Badozai 656 15 0.23 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-E [2/17] Nari 5 M.Yaqoob/H. A Rahim Gorge Bagh Nullah 2. Loni Badozai 410 15 0.14 Total 3527 15 1.21 Nari 1 Kaleemullah/Misri Khan Gorge Budrah Nullah Loni Badozai 1247 15 0.43 Haji Rashid Khan/Mustafa Nari 2 Khan Gorge Budrah Nullah Loni Badozai 1148 15 0.40 Nari 3 Ezatullah/Mohd.Khan Gorge Budrah Nullah Loni Badozai 1378 15 0.47 Nari 4 Obaidullah/H.Habibullah Gorge Budrah Nullah Loni Badozai 1345 15 0.46 Nari 5 Ameen Ullah/ H.A. Rahman Gorge Budrah Nullah Loni Badozai 1181 15 0.41 Nari 6 M. Ali/H. A Rahman Gorge Budrah Nullah Loni Badozai 1224 15 0.42 7523 15 2.59 Grand Total 25638 8.83 GULLO SHEHAR (Nari Gorge) Land Size Width Name and father name of Lenth (In (in S.No Jum leader Scheme Channel Tribe Clan (in feet) feet) Acre) Malik Shah Mohd./Karam Nari Gullo Shehar 1 Khan Gorge Nullah Rind Mandwani 1969 12 0.54 Nari Gullo Shehar 2 Abdul ghafar/Abdul Haleem Gorge Nullah Rind Mandwani 1936 12 0.53 Nari Gullo Shehar 3 Khuda Bux/Khuda Bux Gorge Nullah Rind Mandwani 1903 12 0.52 Nari Gullo Shehar 4 Mohd. Akbar /Saleh Mohd. Gorge Nullah Rind Mandwani 1969 12 0.54 Nari Gullo Shehar 5 Mohd. Azeem/ Mohd. Ishaq Gorge Nullah Rind Mandwani 2133 12 0.59 Malik Shakkar Khan/karam Nari Gullo Shehar 6 Khan Gorge Nullah Rind Mandwani 2034 12 0.56 Nari Gullo Shehar 7 Tariq Aziz/Abdul Aziz Gorge Nullah Rind Mandwani 1936 12 0.53 Nari Gullo Shehar 8 Malik Abdullah Khan/A. Ghani Gorge Nullah Rind Mandwani 1903 12 0.52 Nari Gullo Shehar 9 Rab Nawaz/Mohd. Ishaq Gorge Nullah Rind Mandwani 2001 12 0.55 Nari Gullo Shehar 10 Bashir Ahmad/Mohd. Ishaq Gorge Nullah Rind Mandwani 1772 12 0.49 Nari Gullo Shehar 11 Ghulam Mohd./Mehrab Khan Gorge Nullah Rind Musyani 1772 12 0.49 Total 21327 12 5.88 Dephal village (Nari Gorge) Land Aquired in Canals Sr. Name and father name of Lenth Width (in No. Jum leader Channel Tribe Clan (in ft) (In ft) Acre) Hasham 1 Ghulam Nabi/Allah Dad KhanNullah Dephal SardarKhail 492 15 0.17 Hasham 2 Mohd. Anwar/Shadad Khan KhanNullah Dephal SardarKhail 492 15 0.17 Hasham 3 Mohd. Ibrahim/Rashid Khan KhanNullah Dephal Rashid Khail 459 15 0.16 Hasham 4 Imam bux /Rashid Khan KhanNullah Dephal Rashid Khail 459 15 0.16 Hasham 5 Abdul Karim/Mirza Khan KhanNullah Dephal Rashid Khail 525 15 0.18 Hasham 6 Rasool Bux/Noor Mohd. KhanNullah Dephal Rashid Khail 525 15 0.18 Hasham Mohd. Usman/Lawang Khan 7 KhanNullah Dephal Rashid Khail 591 15 0.20 Hasham Ghulam Nabi/M.Khan 8 KhanNullah Dephal Rashid Khail 591 15 0.20 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-E [3/17] Hasham Mohd. Ayoub /Lawang Khan 9 KhanNullah Dephal Rashid Khail 591 15 0.20 Hasham Qadir Bukhsh/Omar Khan 10 KhanNullah Dephal Rashid Khail 525 15 0.18 Hasham Mula Shabeer /Haroon 11 KhanNullah Dephal Rashid Khail 525 15 0.18 Hasham Haji Ali Mohd./Mirza Khan 12 KhanNullah Dephal Rashid Khail 525 15 0.18 Hasham Jumma Khan/Rashid 13 KhanNullah Dephal Rashid Khail 525 15 0.18 Hasham 14 Khuda Bux /Metta Khan KhanNullah Dephal Balelzai 656 15 0.23 Hasham Ghulam 15 Ghulam Haider/Khudidad KhanNullah Dephal Bolak 558 15 0.19 Hasham Suleman /Hazoor bux 16 KhanNullah Baloch Rind 656 15 0.23 Hasham Mohammad Ali /Fatheh Ali 17 KhanNullah Baloch Rind 656 15 0.23 Hasham Shadi Khan /Hazoor Bux 18 KhanNullah Baloch Rind 525 15 0.18 Hasham Fazal/Malik Dad 19 KhanNullah Baloch Rind 525 15 0.18 Hasham Ghazi Khan/ Hazoor Bux 20 KhanNullah Baloch Rind 492 15 0.17 Hasham Allah Dina /A.Rahim 21 KhanNullah Baloch Rind 1345 15 0.46 Hasham Mita Khan /Raza Mohd. 22 KhanNullah Baloch Rind 1312 15 0.45 Hasham Hayat/Din M. 23 KhanNullah Baloch Rind 1148 15 0.40 Total 14699 15 5.06 Raza/Hasham/Sat Allah Dina /A.Rahim 1 ar Baloch Rind 1608 15 0.55 Raza/Hasham/Sat Mita Khan /Raza Mohd. 2 ar Baloch Rind 1673 15 0.58 Total 3281 15 1.13 Raza /Mohd. Hayat/Din M. 1 Hasham Baloch Rind 1476 15 0.51 Raza /Mohd. Juma Khan /Ghulam jan 2 Hasham Baloch Rind 1411 15 0.49 Total 2887 15 0.99 1 Abdul Hai /Ghulam Mohd. Malik Raza Nullah Baloch Rind 1411 15 0.49 2 Bahar Khan /Haji Ghulam M. Malik Raza Nullah Baloch Rind 1312 15 0.45 3 Shah Mohd./Ghulam Mohd. Malik Raza Nullah Baloch Rind 1411 15 0.49 4 Azad Khan/Dost M. Malik Raza Nullah Baloch Rind 1411 15 0.49 5 Abdul Aziz /Noor M. Bugtti Malik Raza Nullah Baloch Rind 1050 15 0.36 6 Malik Dad/Abdullah Malik Raza Nullah Dephal Balelzai 1476 15 0.51 7 Khuda Bakhsh/Metta Khan Malik Raza Nullah Dephal Balelzai 1280 15 0.44 8 Abbas/Nazir Malik Raza Nullah Dephal Balelzai 1280 15 0.44 9 Sher Mohd./Metta Khan Malik Raza Nullah Dephal Balelzai 1181 15 0.41 Total 11812 15 4.07 1 Habib ullah/Qaisar Malik Dad Nullah 1. Safi Anezai 984 15 0.34 2 Goch Bux/Mawa Faqeer Malik Dad Nullah 1. Safi Anezai 1411 15 0.49 3 Faqeer Khuda Bux /Rasool Bux Malik Dad Nullah 1. Safi Anezai 1641 15 0.56 4 Mohd. Rasheed/Chandia Malik Dad Nullah 1. Safi Anezai 1247 15 0.43 5 Shirdar Khan/khuda Bux Malik Dad Nullah 1. Safi Anezai 1247 15 0.43 6 M. Dur Mohd. /Ghulam Nanbi Malik Dad Nullah 1. Safi Anezai 1345 15 0.46 7 Jan Mohammad /Allah Bux Malik Dad Nullah 1. Safi Anezai 1312 15 0.45 Total 9187 15 3.16 1 Qahimudin/Haji Rasool Bux Malik Dad Nullah 2. Dahapal Ayoubzai 1050 15 0.36 2 M. Abdul Sattar/Sher Mohd. Malik Dad Nullah 2. Dahapal Ayoubzai 984 15 0.34 3 Haji Ghous Bukhsh/Pir bux Malik Dad Nullah 2. Dahapal Ayoubzai 1017 15 0.35 4 Gul Mohammod/Pir Bux Malik Dad Nullah 2. Dahapal Ayoubzai 1148 15 0.40 5 Mohammod Umar/Pir Bux Malik Dad Nullah 2. Dahapal Ayoubzai 853 15 0.29 6 Ghulam Hussain/Sultan Haji Malik Dad Nullah 2. Dahapal Ayoubzai 1017 15 0.35 Total 6070 15 2.09 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-E [4/17] Dahap 1 Dost Mohammod/Haji Sultan Ayoubzai Malik Dad Nullah 3. al 656 15 0.23 Dahap 2 Bari Khan/Haji Sultan Ayoubzai Malik Dad Nullah 3. al 722 15 0.25 Dahap 3 Gul Mohd./Buland Khan Ayoubzai Malik Dad Nullah 3. al 755 15 0.26 4 Ghulam Nabi/A. Ali Malik Dad Nullah 3. Baloch Rind 656 15 0.23 5 Khair Mohd./ Abdul Aziz Malik Dad Nullah 3. Baloch Rind 591 15 0.20 6 Hazoor Khan / Sikandar Malik Dad Nullah 3. Baloch Rind 591 15 0.20 7 Ali Narooz/Sikandar Malik Dad Nullah 3. Baloch Rind 558 15 0.19 8 Nazir Ahmed /Ghulam Hussain Malik Dad Nullah 3. Baloch Rind 722 15 0.25 9 Ghulam Mustafa/ Abdul Rahim Malik Dad Nullah 3. Baloch Rind 722 15 0.25 Total 5971 15 2.06 1 Ghulam Haider/khudidad Malik Dad Nullah 4. Baloch Kosa 1476 23 0.78 2 Raheem Bukhsh/Moula Bux Malik Dad Nullah 4. Baloch Kosa 1476 23 0.78 3 M. Hussain/Metta Khan Malik Dad Nullah 4. Dephal Balelzai 1444 23 0.76 4 M. Ilyas/M.Hussain Malik Dad Nullah 4. Dephal Rashid Khail 1411 23 0.74 5 M. Alam/Mula Mustaqeem Malik Dad Nullah 4. Safi Anezai 1476 23 0.78 6 Obaid ullah /Sadiq Malik Dad Nullah 4. Safi Anezai 1476 23 0.78 7 M. Ismail /Ghulam Nabi Malik Dad Nullah 4. Safi Anezai 1476 23 0.78 8 M. Suleman/M.Sharif Malik Dad Nullah 4. Safi Anezai 1476 23 0.78 9 Mir Khan /Haji Mian Khan Malik Dad Nullah 4. Baloch Rind 1641 23 0.87 10 Noor Khan/Haji Mian Khan Malik Dad Nullah 4. Baloch Rind 1542 23 0.81 11 Abdul Rasheed /Mehboob Ali Malik Dad Nullah 4. Baloch Rind 1542 23 0.81 12 Mehboob Ali /Mehmood Khan Malik Dad Nullah 4. Baloch Rind 1641 23 0.87 13 Ahmed Khan/Mohd.Khan Malik Dad Nullah 4. Baloch Rind 1641 23 0.87 14 Sardar Ali /Haji Mian Khan Malik Dad Nullah 4. Baloch Rind 1641 23 0.87 15 Shareef/Ganwar Khan Malik Dad Nullah 4. Baloch Rind 1641 23 0.87 16 Mian Khan/Mir Khan Malik Dad Nullah 4. Baloch Rind 1312 23 0.69 17 Haji washdil/ Mir Khan Malik Dad Nullah 4. Baloch Rind 984 23 0.52 18 Rehan /Gul Mohd. Malik Dad Nullah 4. Baloch Rind 984 23 0.52 Total 26281 23 13.88 Rasool Bux Abdul Wadood/Haji Rahman 1 Nullahh Dephal Ayoubzai 1214 15 0.42 Rasool Bux Nawab Khan/Haji Sultan 2 Nullahh Dephal Ayoubzai 1181 15 0.41 Rasool Bux Malak Akhtar/Rasool Bux 3 Nullahh Dephal Ayoubzai 1247 15 0.43 Rasool Bux Ali Mohd./Rasool Bux 4 Nullahh Dephal Ayoubzai 1280 15 0.44 Rasool Bux Aftab /Shabab Khan 5 Nullahh Dephal Ayoubzai 1148 15 0.40 Rasool Bux Haji Mohd. Hassan /Rasool Bux 6 Nullahh Dephal Ayoubzai 1116 15 0.38 Rasool Bux 7 Haji M. Hassan/Rasool Bux Nullahh Dephal Ayoubzai 1148 15 0.40 Total 8334 15 2.87 1 Sardar Ali /H.Mian Khan Bugttee Nullah Baloch Rind 1641 15 0.56 2 Shareef/Gawnar Khan Bugttee Nullah Baloch Rind 1312 15 0.45 3 Jawed /Gawnar Khan Bugttee Nullah Baloch Rind 1148 15 0.40 4 Musa Khan /Haji Washdal Bugttee Nullah Baloch Rind 328 15 0.11 5 Haji Punal /Malik Dad Bugttee Nullah Baloch Rind 328 15 0.11 6 Gul Ghanwar/Baloch Khan Bugttee Nullah Baloch Rind 492 15 0.17 7 M. Azeem /Malik Dad Bugttee Nullah Baloch Rind 262 15 0.09 8 Abdul Nabi /Mohd. Bux Bugttee Nullah Baloch Rind 1805 15 0.62 9 Wazir Khan/ Mussa Khan Bugttee Nullah Baloch Rind 656 15 0.23 10 Hussain Bux /Gul Mohd. Bugttee Nullah Baloch Rind 820 15 0.28 11 Amaan ullah/Aman Bux Bugttee Nullah Baloch Rind 984 15 0.34 12 Lal Mohd. /Ghulam Mohd. Bugttee Nullah Baloch Rind 492 15 0.17 13 Fida /Mehboob Ali Bugttee Nullah Baloch Rind 820 15 0.28 14 Habib ullah/Bakhtyar Bugttee Nullah Baloch Rind 984 15 0.34 15 Ataai Khan/Jan Mohd. Bugttee Nullah Baloch Rind 2133 15 0.73 16 Jan Mohammad/M. Jan Bugttee Nullah Baloch Rind 3937 15 1.36 17 Amaan Bux/Gul Mohd. Bugttee Nullah Baloch Rind 656 15 0.23 18 Khuda Bux /M.Azeem Bugttee Nullah Baloch Rind 591 15 0.20 19 Rehmath ullah/Bakhtyar Bugttee Nullah Baloch Rind 591 15 0.20 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-E [5/17] 20 Kumbeer Khan/M. Azeem Bugttee Nullah Baloch Rind 492 15 0.17 21 Mir Mohd./Haji Wash Dil Bugttee Nullah Baloch Rind 492 15 0.17 22 Bahadur Khan/Ghulam Mohd. Bugttee Nullah Baloch Rind 262 15 0.09 23 Ghulam Rasool/M.Azeem Bugttee Nullah Baloch Rind 656 15 0.23 24 Saeed Mohd./H.Ghulam Mohd. Bugttee Nullah Baloch Rind 853 15 0.29 25 Ghazi Khan/H. Ghulam Mohd. Bugttee Nullah Baloch Rind 853 15 0.29 26 Yar Mohd. /H.Ghulam Mohd. Bugttee Nullah Baloch Rind 853 15 0.29 27 KhanMohd. /H.Ghulam Mohd. Bugttee Nullah Baloch Rind 328 15 0.11 28 Raza Mohd. /H.Ghulam Mohd. Bugttee Nullah Baloch Rind 984 15 0.34 29 Gul Mohammad/Aman Bux Bugttee Nullah Baloch Rind 1312 15 0.45 30 Hayat /Gawnar Khan Bugttee Nullah Baloch Rind 1148 15 0.40 31 Liaqat Ali /Gawnar Khan Bugttee Nullah Baloch Rind 1148 15 0.40 32 Shah Nawaz/Mahmood Khan Bugttee Nullah Baloch Rind 1641 15 0.56 33 M. Ibrahim /Ghulam Mohd. Bugttee Nullah Baloch Rind 230 15 0.08 34 Sain Dad /Malik Dad Bugttee Nullah Baloch Rind 656 15 0.23 31891 15 10.98 Grand Total 120413 46.29 Marghzani (Nari Gorge) Land Aquired by Canals S.N Name and father name of Lenth (in Width (In (in o Jum leader Channel Tribe Clan feet) feet) Acre) 1 Faqeer Mohd./ Nouradin Sibi Nullah Faqeer M. Marghzani Shodanzai 1969 15 0.7 2 Malik Haji Bux/Noor Khan Sibi Nullah Faqeer M. Marghzani Shodanzai 2100 15 0.7 3 Mohd. Iqbal/ Zaro Khan Sibi Nullah Faqeer M. Marghzani Shodanzai 2100 15 0.7 4 A. Wahab/Ghous Bux Sibi Nullah Faqeer M. Marghzani Shodanzai 1805 15 0.6 5 Mohd. Farooq/ Qadir Bux Sibi Nullah Faqeer M. Marghzani Shodanzai 2034 15 0.7 Total 10007 15 3.4 Sibi Nullah Qadir 1 Qadir Bux/Ilai Bux Bux Marghzani Malazai 3281 15 1.1 Sibi Nullah Qadir 2 A. Rahman/ Ghulam Yaseen Bux Marghzani Malazai 3281 15 1.1 Sibi Nullah Qadir 3 A.Qayoum/M. Abas Bux Marghzani Malazai 2920 15 1.0 Sibi Nullah Qadir 4 Malik Lateef/Abdul Samad Bux Marghzani Malazai 3051 15 1.1 Sibi Nullah Qadir 5 Abdul Satar/ Ghulam Mohd. Bux Marghzani Malazai 2953 15 1.0 Sibi Nullah Qadir 6 Abdu Wahab/Ghulam Mohd. Bux Marghzani Malazai 3101 15 1.1 Total 18587 15 6.4 Sibi Nullah 1 M. Attaullah/ Rab Nawaz M.Attaullah Marghzani Bostani 492 15 0.2 Sibi Nullah 2 Sher Dil/Mohd. Nawaz M.Attaullah Marghzani Bostani 459 15 0.2 Sibi Nullah 3 khalilullah/Arbab Khan M.Attaullah Marghzani Bostani 525 15 0.2 Sibi Nullah 4 M. Qasim/Nasrullah Khan M.Attaullah Marghzani Bostani 509 15 0.2 Sibi Nullah 5 Mohd. Aslam/Khair Mohd. M.Attaullah Marghzani Bostani 394 15 0.1 Sibi Nullah 6 Mohd. Isaq/Sayed Khan M.Attaullah Marghzani Bostani 459 15 0.2 Sibi Nullah 7 Asad Khan/Allah Bux M.Attaullah Marghzani Bostani 492 15 0.2 Sibi Nullah 8 Habib nawaz/KhanMohd. M.Attaullah Marghzani Bostani 459 15 0.2 Sibi Nullah 9 Javaid/Salah Mohd. M.Attaullah Marghzani Bostani 476 15 0.2 Sibi Nullah 10 Nazar Khan/Salah Mohd. M.Attaullah Marghzani Bostani 492 15 0.2 Total 4757 15 1.6 1 Mohd. Alam/ Mustaqeem Kurak Nullah Marghzani Marghzani 1641 15 0.6 2 Obaidullah/M.sadiq Kurak Nullah Marghzani Marghzani 2034 15 0.7 3 Mohd. Suleman/M.Sharif Kurak Nullah Marghzani Marghzani 1969 15 0.7 4 Haji Habibullah /Qasir Khan Kurak Nullah Marghzani Marghzani 1805 15 0.6 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-E [6/17] 5 Manzoor Ahmad/Arbab Khan Kurak Nullah Marghzani Marghzani 1660 15 0.6 6 Mohd. Saleem/Mohd.Khan Kurak Nullah Marghzani Marghzani 1312 15 0.5 Total 10420 15 3.6 1 M. Dur Mohd./Ghulam Nabi Sibi Nullah Safi Safi 3051 15 1.1 2 M.Shah Nawaz/Mohd. Usman Sibi Nullah Safi Safi 3117 15 1.1 3 Mohd. Mateen/Dad Mohd. Sibi Nullah Safi Safi 3215 15 1.1 4 Mohd. Omar/Maghul Khan Sibi Nullah Safi Safi 2953 15 1.0 5 Haji Dur Mohd./Ghulam Nabi Sibi Nullah Safi Safi 2723 15 0.9 Total 15060 15 5.2 1 Malik Azizullah/Malak Dad Kurak Nullah Marghzani Samezai 1706 15 0.6 2 Malik M.Asghar/Qahim Khan Kurak Nullah Marghzani Samezai 1608 15 0.6 3 KhanMohd./Mohd. Ishaq Kurak Nullah Marghzani Samezai 1641 15 0.6 4 Qadir Bux/Hazoor Bux Kurak Nullah Marghzani Samezai 1673 15 0.6 5 Moula Bux/ Abdul Rahman Kurak Nullah Marghzani Samezai 1641 15 0.6 6 Ghani Mohd./Haji Khan Kurak Nullah Marghzani Samezai 1595 15 0.5 Total 9863 15 3.4 1 Dani Bux/Abdul Rahman Samezai Marghzani Samezai 1378 15 0.5 2 Mohd. Saleem/Ahamad Khan Samezai Marghzani Samezai 1312 15 0.5 3 Mohd. Bashir/Sohail Khan Samezai Marghzani Samezai 1280 15 0.4 4 Mohammad Khan/Khushdil Samezai Marghzani Samezai 1345 15 0.5 5 Mohd.Khan/Hafeez Khan Samezai Marghzani Samezai 1411 15 0.5 6726 15 2.3 Grand Total 75420 15 26.0 Khajjak Village (Nari Gorge) Land Aquired in Canals Sr. Name and father name of Jum Lenth Width (in No. leader Channel Tribe Clan (in feet) (In feet) Acre) Khaja 1 Mir Khudidad/Sardar Ismail Nullah Hameemzai k Hameemzai 1394 15 0.5 Khaja Shahbaz Khan /Ghulam Mustafa 2 Nullah Hameemzai k Hameemzai 1083 15 0.4 Khaja Abdul Sattar/Haji Rahim 3 Nullah Hameemzai k Hameemzai 1247 15 0.4 Khaja Haji Meta Khan/Yaqoob Khan 4 Nullah Hameemzai k Hameemzai 1280 15 0.4 Khaja Babu Allah Dad/Saadullah 5 Nullah Hameemzai k Hameemzai 1280 15 0.4 Khaja Shakar Khan/Jumma Khan 6 Nullah Hameemzai k Hameemzai 1148 15 0.4 Khaja Muheem Khan/Ghulam Mustafa 7 Nullah Hameemzai k Hameemzai 1312 15 0.5 Total 8744 15 3.0 Khaja 1 M. Azad Khan/Malik Sayed Khan jam Isaqzai Nullah k Isaqzai 1969 15 0.7 Khaja Mohd. Ismail/Dur Mohd. 2 jam Isaqzai Nullah k Isaqzai 2133 15 0.7 Khaja Sahib Khan/Fazal Khan 3 jam Isaqzai Nullah k Isaqzai 2330 15 0.8 Khaja Mohammad Khan/Arbab Khan 4 jam Isaqzai Nullah k Isaqzai 2231 15 0.8 Khaja shakar Khan/Arbab Khan 5 jam Isaqzai Nullah k Isaqzai 2133 15 0.7 Khaja Mesri Khan/Shakkar Khan 6 jam Isaqzai Nullah k Isaqzai 2264 15 0.8 Khaja Taj Mohammad/Mohd. Sadiq 7 jam Isaqzai Nullah k Isaqzai 1952 15 0.7 Khaja Wali Mohd./Gul Mohd. 8 jam Isaqzai Nullah k Isaqzai 2133 15 0.7 Khaja Wazir Khan/Haji Mohd. 9 jam Isaqzai Nullah k Isaqzai 1641 15 0.6 Khaja Allah dad/malik Khan 10 jam Isaqzai Nullah k Isaqzai 2034 15 0.7 Khaja Mohd. Aslam/Khair Mohd. 11 jam Isaqzai Nullah k Isaqzai 1805 15 0.6 Khaja Ejaz Khan /Ghulam Sarwar 12 jam Isaqzai Nullah k Isaqzai 1641 15 0.6 Khaja Abdul Haaq/Kalo Khan 13 jam Isaqzai Nullah k Isaqzai 1575 15 0.5 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-E [7/17] Total 25838 15 8.9 Khaja 1 Malik Ahmad Khan/Mohim Khan Khushi Nullah k Khushi 1706 15 0.6 Khaja Imadad /Abdul Razaq 2 Khushi Nullah k Khushi 1805 15 0.6 Khaja Mir Khan/Mohd.Khan 3 Khushi Nullah k Khushi 1870 15 0.6 Khaja Allah Dina/Shar Mohd. 4 Khushi Nullah k Khushi 1641 15 0.6 Khaja Mustafa Khan/Ahamad Khan 5 Khushi Nullah k Khushi 1608 15 0.6 6 Syed kundal shah/Syed Hakeem Khushi Nullah Syed Syed 1575 15 0.5 7 Syed Mehd Shah/Ghulam shah Khushi Nullah Syed Syed 1608 15 0.6 Total 11812 15 4.1 Khaja 1 Malik Mazar Khan/Ali Khan Jam Behramzai k Brahamzai 1345 15 0.5 Khaja Saeed Ahmad/Abdullah 2 Jam Behramzai k Brahamzai 1280 15 0.4 Khaja Hussain Khan/Ismail Khan 3 Jam Behramzai k Brahamzai 1312 15 0.5 Khaja Mohd. Yaqoob /Haji Khudi Dad 4 Jam Behramzai k Brahamzai 1312 15 0.5 Khaja Mohammad umar/Mohd.Khan 5 Jam Behramzai k Brahamzai 1394 15 0.5 Khaja Merza Khan/Noor Mohd. 6 Jam Behramzai k Brahamzai 1280 15 0.4 Khaja Ahmad Khan/Hasal Khan 7 Jam Behramzai k Brahamzai 984 15 0.3 Khaja Raza Mohd./Mehmood Khan 8 Jam Behramzai k Brahamzai 1116 15 0.4 Total 10023 15 3.5 1 Malik Hazar Khan/Abdul Rahman Omarzai Nullah Khajak Omarzai 1706 15 0.6 2 Khudad Khan/Mirza Khan Omarzai Nullah Khajak Omarzai 1641 15 0.6 3 Malik Noor Mohd./Akhtyar Khan Omarzai Nullah Khajak Omarzai 1805 15 0.6 4 Mehmood Khan/Akhtyar Khan Omarzai Nullah Khajak Omarzai 1641 15 0.6 5 Mehrab Khan/Akhytar Khan Omarzai Nullah Khajak Omarzai 1444 15 0.5 Total 8235 15 2.8 1 Mujeebullah/Fatheh KhanKhajak Jaffarzai Nullah Khajak Jaffarzai 1148 15 0.4 Mohammad Yousaf/Abdul 2 Rehman Jaffarzai Nullah Khajak Jaffarzai 1214 15 0.4 3 Abdul Majeed/sadiq Jaffarzai Nullah Khajak Jaffarzai 1378 15 0.5 4 Mohd. Hameed/Azad Khan Jaffarzai Nullah Khajak Jaffarzai 1083 15 0.4 5 Haji Yaqoob Khan/Mohd. Hassan Jaffarzai Nullah Khajak Jaffarzai 1280 15 0.4 6 Niaz Mohammad/Abdul Kareem Jaffarzai Nullah Khajak Jaffarzai 1345 15 0.5 7 Mohd. Hasan/Din Mohd. Jaffarzai Nullah Khajak Jaffarzai 951 15 0.3 8 Haji Fatheh/Mussa Khan Jaffarzai Nullah Khajak Jaffarzai 1066 15 0.4 9 Mussa Khan/Karam Khan Jaffarzai Nullah Khajak Jaffarzai 1230 15 0.4 10 Karam Khan/Faqeer Khan Jaffarzai Nullah Khajak Jaffarzai 1312 15 0.5 11 Haji Dost Mohd./Mohd. Omar Jaffarzai Nullah Khajak Jaffarzai 1312 15 0.5 12 Allah Dina/Allah Dad Jaffarzai Nullah Khajak Jaffarzai 1641 15 0.6 Total 14961 15 5.2 1 M. Mazar Khan/Abdullah Khan Jam Karyazai Khajak Karyazai 1312 15 0.5 2 Mussa Khan/Malik Ahamad Jam Karyazai Khajak Karyazai 1312 15 0.5 3 Ismail Khan/Mohd. Ishaq Jam Karyazai Khajak Karyazai 1312 15 0.5 4 Mehmood Khan/A.Ghafoor Jam Karyazai Khajak Karyazai 1312 15 0.5 5 Sahid Khan/Rahim Khan Jam Karyazai Khajak Karyazai 1312 15 0.5 6 Mir Ahmad/Essa Khan Jam Karyazai Khajak Karyazai 1312 15 0.5 7 Rashid Khan/Haji Musawer Jam Karyazai Khajak Karyazai 1312 15 0.5 8 Mir Khan/Mohd. Hassan Jam doulatzai Khajak Doulatzai 1148 15 0.4 9 Mohd. Ibrahim/Mohd. Hassan Jam doulatzai Khajak Doulatzai 1476 15 0.5 10 Rashid Khan/Jumma Khan Jam doulatzai Khajak Doulatzai 1312 15 0.5 11 M. Mustafa Khan/Ahamad Khan Jam doulatzai Khajak Doulatzai 1312 15 0.5 12 Abdul Qadir/Mula Mohd. Jam doulatzai Khajak Malazai 1312 15 0.5 13 Mohd. Azeem/Dad Mohd. Jam doulatzai Khajak Mubarakzai 984 15 0.3 14 Shah Mohd./Mohd. Rahim Jam doulatzai Khajak Mubarakzai 984 15 0.3 15 Mohd. Aslam/Allah Dad Jam doulatzai Khajak Mubarakzai 984 15 0.3 Total 18702 15 6.4 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-E [8/17] 1 Mujeebullah/Fatheh Khan Sabzreg Nullah Khajak Jaffarzai 1312 20 0.6 2 Mohd. Yousaf/Abdul Rehman Sabzreg Nullah Khajak Jaffarzai 1280 20 0.6 3 Abdul Majeed/Sadiq Sabzreg Nullah Khajak Jaffarzai 1148 20 0.5 4 Mohd. Hameed/Azad Khan Sabzreg Nullah Khajak Jaffarzai 1575 20 0.7 5 H. Yaqoob Khan/Mohd. Hassan Sabzreg Nullah Khajak Jaffarzai 1476 20 0.7 6 Niaz Mohd./Abdul Kareem Sabzreg Nullah Khajak Jaffarzai 1280 20 0.6 7 Mohd. Hasan/Din Mohd. Sabzreg Nullah Khajak Jaffarzai 1345 20 0.6 8 Haji Fatheh/Mussa Khan Sabzreg Nullah Khajak Jaffarzai 1378 20 0.6 9 M. Hazar Khan/Abdul Rahman Sabzreg Nullah Khajak Omarzai 1017 20 0.5 10 Khudad Khan/Mirza Khan Sabzreg Nullah Khajak Omarzai 1181 20 0.5 11 Malik Noor Mohd./Akhtyar Khan Sabzreg Nullah Khajak Omarzai 1148 20 0.5 12 Mir Khan/Mohd. Hassan Sabzreg Nullah Khajak Doulatzai 1148 20 0.5 13 Mohd.ibrahim/Mohd. Hassan Sabzreg Nullah Khajak Doulatzai 1247 20 0.6 14 Rashid Khan/Jumma Khan Sabzreg Nullah Khajak Doulatzai 1017 20 0.5 15 Malik Mustafa/Ahamad Khan Sabzreg Nullah Khajak Doulatzai 1641 20 0.8 16 M. Mazar Khan/Abdullah Khan Sabzreg Nullah Khajak Karyazai 1641 20 0.8 17 Mussa Khan/M. Ahamad Khan Sabzreg Nullah Khajak Karyazai 1673 20 0.8 18 Ismail Khan/Mohd. Ishaq Sabzreg Nullah Khajak Karyazai 1608 20 0.7 19 Mehmood Khan/A.Ghafoor Sabzreg Nullah Khajak Karyazai 1476 20 0.7 20 Malik Mazar Khan/Ali Khan Sabzreg Nullah Khajak Brahamzai 1148 20 0.5 21 Saeed Ahmad/Abdullah Sabzreg Nullah Khajak Brahamzai 1312 20 0.6 22 Hussain Khan/Ismail Khan Sabzreg Nullah Khajak Brahamzai 1641 20 0.8 23 Mohd. Yaqoob /H. Khudi Dad Sabzreg Nullah Khajak Brahamzai 1903 20 0.9 24 Mohd. Umar/Mohd.Khan Sabzreg Nullah Khajak Brahamzai 1608 20 0.7 25 M. Ahmad Khan/Mohim Khan Sabzreg Nullah Khajak khushi 1476 20 0.7 26 Imadad /Abdul Razaq Sabzreg Nullah Khajak khushi 1476 20 0.7 27 Mohd. Hassan/Gul Mohd. Sabzreg Nullah Khajak Salehzai 1641 20 0.8 28 Salah Mohd./Gul Mohd. Sabzreg Nullah Khajak Salehzai 1312 20 0.6 29 Mir khudidad/Sardar Ismail Sabzreg Nullah Khajak Hameemzai 1116 20 0.5 30 Shahbaz Khan /Ghulam Mustafa Sabzreg Nullah Khajak Hameemzai 1312 20 0.6 31 Abdul Sattar/Haji Rahim Sabzreg Nullah Khajak Hameemzai 1148 20 0.5 32 Haji Meta Khan/Yaqoob Khan Sabzreg Nullah Khajak Hameemzai 1608 20 0.7 33 Babu Allah Dad/Saadullah Sabzreg Nullah Khajak Hameemzai 1641 20 0.8 Total 45934 20 21.1 Kurak Village (Nari Goarge) Land Aquired in Canals Sr.N Name and father name of Jum Lenth Width (in o. leader Channel Tribe Clan (in ft) (In ft) Acre) 1 Rais Abdul Hakeem/Fatheh M. Kurak Barozari Lalozai 2706 15 0.9 2 Mohd. Isaq/Mohabat Khan Kurak Barozari Lalozai 2296 15 0.8 3 Yaro Khan/Nawab M. Khan Kurak Barozari Lalozai 4100 15 1.4 4 Ahamad Khan/Atta Mohd. Kurak Barozari Bijarzai 2624 15 0.9 5 Mir Mohd./Bahar Khan Kurak Barozari Khalband 3116 15 1.1 6 M.Yaqoob/A. Rahim Kurak Barozari Khalband 1640 15 0.6 7 Malik Hazoor Bux/Khair Bux Kurak Barozari Mahmoodzai 2788 15 1.0 8 KhanMohd./Haji Khan Kurak Barozari Lalozai 2788 15 1.0 9 Shafah Mohd./Murtza Khan Kurak Safi Safi 2460 15 0.8 10 Abdul Raziq/Dur Mohd. Kurak Safi Safi 2460 15 0.8 TOTAL 26978 15 9.3 Arand/ Bori Flood Schemes (Nari Goarge) Land Aquired in Canals Lent Widt Sr.N Name and father name of h (in h (In (in o. Farmer Village Channel Tribe Clan ft) ft) Acre) 1 Allah Dad /Hashey Khan Khajak Khajak Branch Khajak Jafarzai 492 91.86 1.0 2 Mirza Khan/Abdullah Khan Khajak Khajak Branch Khajak Jafarzai 459 91.86 1.0 3 Allah Dad /Karam Khan Khajak Khajak Branch Khajak Jafarzai 328 91.86 0.7 4 Azad Khan/Sayed Khan Khajak Khajak Branch Khajak Jafarzai 590 91.86 1.2 5 Khudi Dad/Ibrahim Khajak Khajak Branch Khajak Jafarzai 394 91.86 0.8 6 Kabeer Khan/Qahim Khan Khajak Khajak Branch Khajak Jafarzai 426 91.86 0.9 Chairman Hassan/ Mula 7 Aman Khajak Khajak Branch Khajak Jafarzai 623 91.86 1.3 8 Allah Dena/Fatheh Khan Khajak Khajak Branch Khajak Jafarzai 328 91.86 0.7 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-E [9/17] 9 Mohd.Khan/Mula Mohd. Khajak Khajak Branch Khajak Jafarzai 459 91.86 1.0 10 Hussain Khan/Hashey Khan Khajak Khajak Branch Khajak Jafarzai 361 91.86 0.8 11 Qadir bakhsh/Satar Khajak Khajak Branch Khajak Jafarzai 295 91.86 0.6 Gul Mohammad/Hashey 12 Khan Khajak Khajak Branch Khajak Jafarzai 377 91.86 0.8 13 Mubarak/Mohd. Hussain Khajak Khajak Branch Khajak Jafarzai 607 91.86 1.3 Total 5740 91.86 12.1 1 Mohd. Usman/M. Khan Loni Loni branch Loni Loni 315 91.86 0.7 2 Edayatullah/Mahmood Khan Loni Loni branch Loni Loni 262 91.86 0.6 3 Mohd. Anwar/Abdul Rahim Loni Loni branch Loni Loni 295 91.86 0.6 4 Rashid Khan/Mustafa Khan Loni Loni branch Loni Loni 361 91.86 0.8 5 Dr. Allah Dad/Mohd.Khan Loni Loni branch Loni Loni 279 91.86 0.6 6 Mohd.Khan/Haji A. Satar Loni Loni branch Loni Loni 394 91.86 0.8 Total 1906 91.86 4.0 Zalozai 1 Ahamad Khan/ Mussa Khan Khajak Doulatzai Branch Khajak Khajak 344 91.86 0.7 Zalozai 2 Hussain Khan/Mir Khan Khajak Doulatzai Branch Khajak Khajak 344 91.86 0.7 Zalozai 3 Mohd. Yaqoob/M. Hassan Khajak Doulatzai Branch Khajak Khajak 361 91.86 0.8 Zalozai 4 Niaz Mohd./Mir Khan Khajak Doulatzai Branch Khajak Khajak 656 91.86 1.4 Zalozai 5 Naseer Khan/Mir Khan Khajak Doulatzai Branch Khajak Khajak 551 91.86 1.2 6 Niaz Mohd./Jumma Khan Khajak Imamzai Branch Khajak Imamzai 443 91.86 0.9 7 Rais M.Azeem/Taj Mohd. Khajak Imamzai Branch Khajak Imamzai 426 91.86 0.9 8 Haji Dost Mohd./M. Omar Khajak Jafarzai Branch Khajak Jafarzai 98 91.86 0.2 9 Abdul Rahman/yasouf Khan Khajak Jafarzai Branch Khajak Jafarzai 115 91.86 0.2 10 Haji Ismail/Azad Khan Khajak Jafarzai Branch Khajak Jafarzai 82 91.86 0.2 11 Hussain Khan/M.Omar Khan Khajak Jafarzai Branch Khajak Jafarzai 102 91.86 0.2 12 Abdul Hameed/Azad Khan Khajak Jafarzai Branch Khajak Jafarzai 95 91.86 0.2 13 M.Sadiq/Azad Khan Khajak Jafarzai Branch Khajak Jafarzai 108 91.86 0.2 Behramzai 14 M. Hassan/Jalal Khan Khajak Branch Khajak Behramzai 328 91.86 0.7 Behramzai 15 Mohammad Khan/A.Karim Khajak Branch Khajak Zalozai 262 91.86 0.6 16 Mahmood Khan/Ikhtyar Khan Khajak Omarzai Branch Khajak Omarzai 361 91.86 0.8 17 Wali Mohd./Gul Mohammad Khajak Omarzai Branch Khajak Omarzai 459 91.86 1.0 18 Mussa Khan/Ahamad Khan Khajak Omarzai Branch Khajak Omarzai 197 91.86 0.4 Total 5333 91.86 11.25 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-E [10/17] Dephal Scheme Household Information Total Land Sr.No. Name of Head of Father’s Name of the Head of Family Name of Village Tribe Clan Owned by Household Household Size Family (acres) 1 Mohammod Usman Lawang Khan Dahpal Dahapal RashidKhail 8 80 2 Ghulam Nabi Mohammod Khan Dahpal Dahapal RashidKhail 12 80 3 Khuda Bakhsh Mita Khan Dahpal Dahapal Bilalzai 4 18 4 Abdul Wadood Abdul Rehman Dahpal Dahapal Ayoubzai 7 40 5 Aasil Khan Shah Dad Dahpal Baloch Marri 5 20 6 Mohammod Qayoum Mohammod Nawaz Dahpal Baloch Marri 8 50 7 Mohammod Ayoub Mohammod Nawaz Dahpal Baloch Marri 7 50 8 Mohammad Yaya Mohammod Nawaz Dahpal Baloch Marri 12 40 9 Mohammod Rafeeq Mohammod Nawaz Dahpal Baloch Marri 8 50 10 Mohanmmod Nasir Noor Mohammod Dahpal Baloch Marri 5 50 11 Saeed Ahmad Noor Mohammod Dahpal Baloch Marri 9 50 12 Zahir Ahmad Noor Mohammod Dahpal Baloch Marri 8 50 13 Mohammod Khan Noor Mohammod Dahpal Baloch Rind 7 30 14 Abdul Aziz Noor Mohammod Dahpal Baloch Rind 7 30 15 Rasool Bukhsh Noor Mohammod Dahpal Baloch Rind 6 30 16 Allah Dinna Mirza Khan Dahpal Dahapal RashidKhail 6 30 17 Abdul Kareem Mirza Khan Dahpal Dahapal RashidKhail 9 30 18 Inaam Bukhsh Rashid Dahpal Dahapal RashidKhail 5 30 19 Mohammod Ibraheem Rashid Dahpal Dahapal RashidKhail 6 30 20 Mohammod Anwar Shah Dad Khan Dahpal Dahapal RashidKhail 6 40 21 Peer Bukhsh Shah Dad Khan Dahpal Dahapal Sardarzai 7 40 22 Dahni Bukhsh Shah Dad Khan Dahpal Dahapal Sardarzai 7 40 23 Ghulam Nabi Allah Dad Dahpal Dahapal Sardarzai 16 40 24 Essa Khan Allah Dad Dahpal Dahapal Sardarzai 32 40 25 Mohammod Hashim Allah Dad Dahpal Dahapal Sardarzai 12 40 26 Haji Ali Mohammod Mirza Khan Dahpal Dahapal RashidKhail 9 40 27 Ghulam Haider Khudaidad Dahpal Baloch Kohsa 6 40 28 Haji Raheem Bukhsh Mula Bukhsh Dahpal Baloch Kohsa 11 40 29 Nabi Bukhsh Shah Dad Dahpal Dahapal RashidKhail 5 30 30 Mohammod ilyas Mohammod Hussain Dahpal Dahapal RashidKhail 15 30 31 Jumma Khan Rashid Dahpal Dahapal RashidKhail 9 30 32 Mohammod Ayoub Lawang Khan Dahpal Dahapal RashidKhail 4 80 33 Mohammod Aslam Buland Khan Dahpal Dahapal RashidKhail 12 35 34 ShamsuDin Buland Khan Dahpal Dahapal RashidKhail 7 35 35 Mula Shabeer Haroon Dahpal Dahapal RashidKhail 9 45 36 Azad Khan Habib Khan Dahpal Dahapal RashidKhail 6 25 37 Qadir Bukhsh Umar Khan Dahpal Dahapal RashidKhail 10 50 38 Haji Allah Yar Jan Mohammod Dahpal Dahapal RashidKhail 9 40 39 Nawab Khan Haji Sultan Dahpal Dahapal Ayoubzai 8 60 40 Malak Mohammod Akhtar Haji Rasool Bukhsh Dahpal Dahapal Ayoubzai 12 35 41 Ali Mohammod Haji Rasool Bukhsh Dahpal Dahapal Ayoubzai 7 40 42 Aftab Shabab Khan Dahpal Dahapal Ayoubzai 6 35 43 Haji Mohammod Hassan Haji Rasool Bukhsh Dahpal Dahapal Ayoubzai 4 40 44 QahimuDin Haji Rasool Bukhsh Dahpal Dahapal Ayoubzai 12 40 45 Malak Abdul Sattar Haji Sher Mohammod Dahpal Dahapal Ayoubzai 8 40 46 Haji Ghous Bukhsh Haji Pir Bukhsh Dahpal Dahapal Ayoubzai 4 40 47 Gul Mohammod Haji Pir Bukhsh Dahpal Dahapal Ayoubzai 4 35 48 Mohammod Umar Haji Pir Bukhsh Dahpal Dahapal Ayoubzai 5 35 49 Ghulam Hussain Haji Sultan Dahpal Dahapal Ayoubzai 12 80 50 Dost Mohammod Haji Sultan Dahpal Dahapal Ayoubzai 8 60 51 Bari Khan Haji Sultan Dahpal Dahapal Ayoubzai 6 60 52 Gul Mohammod Buland Khan Dahpal Dahapal Ayoubzai 12 60 53 Abbas Nazir Ahmad Dahpal Dahapal Bilalzai 5 30 54 Sher Mohammod Mita Khan Dahpal Dahapal Bilalzai 8 30 55 Mohammod Hussain Mita Khan Dahpal Dahapal Bilalzai 6 30 56 Suleman Hazoor Bux Ghulam Bulak Baloch Rind 12 40 57 Mohammad Ali Fateh Ali Ghulam Bulak Baloch Rind 7 40 58 Shadi Khan Hazoor Bux Ghulam Bulak Baloch Rind 15 40 59 Fazal Malik Dad Ghulam Bulak Baloch Rind 7 60 60 Ghazi Khan Hazoor Bux Ghulam Bulak Baloch Rind 11 40 61 Allah Dina Abdul Rahim Ghulam Bulak Baloch Rind 7 40 62 Mita Khan Raza Mohammad Ghulam Bulak Baloch Rind 11 40 63 Hayat Din Mohammad Ghulam Bulak Baloch Rind 11 40 64 Juma Khan Ghulam Jan Ghulam Bulak Baloch Rind 8 60 65 Abdul Hai Ghulam Mohammad Ghulam Bulak Baloch Rind 21 40 66 Bahar Khan Haji Ghulam Mohammad Ghulam Bulak Baloch Rind 10 110 67 Shah Mohammad Ghulam Mohammad Ghulam Bulak Baloch Rind 20 40 68 Azad Khan Dost Mohammad Ghulam Bulak Baloch Rind 11 40 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-E [11/17] 69 Ghulam Nabi Aali Ghulam Bulak Baloch Rind 6 40 70 Khair Mohammad Abduol Aziz Ghulam Bulak Baloch Rind 9 30 71 Hazoor Khan sikandar Ghulam Bulak Baloch Rind 9 40 72 Ali Narooz sikandar Ghulam Bulak Baloch Rind 10 40 73 Nazir Ahmad Ghulam Hussain Ghulam Bulak Baloch Rind 8 40 74 Ghulam Mustafa Abdul Rahim Ghulam Bulak Baloch Rind 7 40 75 Mir Khan Haji Mian Khan Ghulam Bulak Baloch Rind 10 300 76 Norooz Khan Haji Mian Khan Ghulam Bulak Baloch Rind 9 250 77 Abdul Rashid Mehboob Ali Ghulam Bulak Baloch Rind 7 220 78 Mehboob Ali Mehmood Khan Ghulam Bulak Baloch Rind 30 200 79 Ahmad Khan Mohmmad Khan Ghulam Bulak Baloch Rind 14 200 80 Sardar Ali Haji Mian Khan Ghulam Bulak Baloch Rind 30 300 81 Shareef Ghanwar Khan Ghulam Bulak Baloch Rind 4 200 82 Jawed Ghanwar Khan Ghulam Bulak Baloch Rind 4 240 83 Musa Khan Haji washdil Ghulam Bulak Baloch Rind 14 30 84 Mian Khan Meer Khan Ghulam Bulak Baloch Rind 14 400 85 Haji washdil Meer Mohammad Ghulam Bulak Baloch Rind 34 400 86 Rehan Gul Mohammad Ghulam Bulak Baloch Rind 7 130 87 Haji Punal Malik Dad Ghulam Bulak Baloch Rind 7 60 88 Gul Ghanwar Baloch Khan Ghulam Bulak Baloch Rind 11 40 89 M. Azeem Malik Dad Ghulam Bulak Baloch Rind 9 50 90 Abdul Nabi Mohammad Bux Ghulam Bulak Baloch Rind 9 300 91 Wazir Khan Moosa Khan Ghulam Bulak Baloch Rind 11 80 92 Hussain Bux Gul Mohammad Ghulam Bulak Baloch Rind 43 130 93 Amaan ullah Amaan Bux Ghulam Bulak Baloch Rind 8 180 94 Lal Mohammad Ghulam Mohammad Ghulam Bulak Baloch Rind 21 40 95 Fida Meboob Ali Ghulam Bulak Baloch Rind 5 60 96 Habib ullah Bakhtyar Ghulam Bulak Baloch Rind 10 100 97 Ataai Khan Jan Mohammad Ghulam Bulak Baloch Rind 14 350 98 Jan Mohammad Mohammad Jan Ghulam Bulak Baloch Rind 9 600 99 Amaan Bux Gul Mohammad Ghulam Bulak Baloch Rind 9 130 100 Khuda Bux M Azeem Ghulam Bulak Baloch Rind 9 120 101 Rehmath ullah Bakhtyar Ghulam Bulak Baloch Rind 9 120 102 Kumbeer Khan M Azeem Ghulam Bulak Baloch Rind 10 100 103 Mir Mohammad Haji washdil Ghulam Bulak Baloch Rind 18 130 104 Bahadur Khan Ghulam Mohammad Ghulam Bulak Baloch Rind 17 40 105 Ghulam Rasool M Azeem Ghulam Bulak Baloch Rind 7 80 106 Saeed Mohammad Haji Ghulam Mohammad Ghulam Bulak Baloch Rind 14 130 107 Ghazi Khan Haji Ghulam Mohammad Ghulam Bulak Baloch Rind 10 150 108 Yar Mohammad Haji Ghulam Mohammad Ghulam Bulak Baloch Rind 10 130 109 Khan Mohammad Haji Ghulam Mohammad Ghulam Bulak Baloch Rind 20 40 110 Raza Mohammad Haji Ghulam Mohammad Ghulam Bulak Baloch Rind 5 100 111 Gul Mohammad Amaan Bux Ghulam Bulak Baloch Rind 13 250 112 Hayat Ghanwar Khan Ghulam Bulak Baloch Rind 20 200 113 Liaqat Ali Ghanwar Khan Ghulam Bulak Baloch Rind 12 200 114 Shah Nawaz Mahmood Khan Ghulam Bulak Baloch Rind 6 300 115 Mohammad Ibrahim Ghulam Mohammad Ghulam Bulak Baloch Rind 20 40 116 Sain Dad Malik Dad Ghulam Bulak Baloch Rind 11 70 117 Mohammad Hanif Ghulam Mohammad Ghulam Bulak Baloch Rind 18 40 118 Haji Malik Dad Sain Dad Ghulam Bulak Baloch Rind 14 60 119 mullah alam mullah Mustaqeem Safi Sefi Anazai 9 100 120 Obaid ullah Mohammad sadique Safi Safi Anazai 4 100 121 Mohammad Ismail Ghulam Nabi Safi Safi Anazai 5 100 122 Mohammad suleman Mohmmad Sharif Safi Safi Anazai 10 50 123 Habib ullah Qaiser Khan Safi Safi Anazai 25 75 124 Goch Bux Mewa Faqeer Safi Safi Anazai 8 50 125 Faqeer Khuda Bux Faqeer Rasool Bux Safi Safi Anazai 10 70 126 Mohammad Rashid Chandia Safi Safi Anazai 10 30 127 Shirdar Khan Khuda Bux Safi Safi Anazai 3 15 128 Malik Dur Mohmmad Malik Ghulam Nabi Safi Safi Anazai 22 70 129 Jan Mohammad Faqeer Allah Bux Safi Safi Anazai 17 70 Total 1367 11178 Khajak Scheme Household Information Total S.No. Name of Head of Father’s Name of the Head of Family Land Name of Village Tribe Clan Household Household Size Owned by Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-E [12/17] Family (acres) 1 Hafiezullah Khan Amanullah Khan Davi Valari Khan Marghzani KhanKhail 7 200 2 Zahir Khan Arze Mohammad Khan Davi Valari Khan Marghzani KhanKhail 5 200 3 Nawab Khan Khaliq Dad Davi Valari Khan Marghzani KhanKhail 4 150 4 Shahjahan Khaliq Dad Davi Valari Khan Marghzani KhanKhail 6 150 5 Mir Ahmad Khaliq Dad Davi Valari Khan Marghzani KhanKhail 5 150 6 Noor Ahmad Khaliq Dad Davi Valari Khan Marghzani KhanKhail 4 150 7 mir Abdul Samad Khan Mir Wali Mohmmad Davi Valari Khan Marghzani KhanKhail 7 600 8 Mohammad Aslam Inayatullah Davi Valari Khan Marghzani KhanKhail 2 150 9 Rehmatullah Inayatullah Davi Valari Khan Marghzani KhanKhail 3 150 10 Tanwir Ahmad Hidaitullah Davi Valari Khan Marghzani KhanKhail 2 150 11 Fazal Khan Hidaitullah Davi Valari Khan Marghzani KhanKhail 4 150 12 Mir Azizullah Khan Khan Mohammad Khan Davi Valari Khan Marghzani KhanKhail 12 300 13 Sanaullah Khan Amanullah Khan Davi Valari Khan Marghzani KhanKhail 9 200 14 Malak shah Mohmmad Karam Khan Gulo saher Nodani Mandwani 13 80 15 Hazar Khan Mazar Khan Gulo saher Nodani Mandwani 18 50 16 Najeebullah Mohammad Khan Gulo saher Nodani Mandwani 5 35 17 Ghulam Mohammd Mehrab Khan Gulo saher Nodani Mandwani 20 30 18 Allah Dina Juma Khan Gulo saher Nodani Mandwani 10 20 19 Allah Dina Hazor Bakhsh Gulo saher Nodani Mandwani 10 20 20 Sharee Mohammad Rashool Bakhsh Gulo saher Nodani Mandwani 8 20 21 Ali Mohammad Mohammad Yaqoob Gulo saher Nodani Mandwani 6 35 22 Allah Dad Abdul Hayee Gulo saher Nodani Mandwani 10 20 23 Dost Mohammad Sharee Mohammad Gulo saher Nodani Mandwani 6 20 24 Ghos bhaksh Mohammad Khan Gulo saher Nodani Mandwani 5 18 25 Mohammad Yaqoob khuda Bakhsh Gulo saher Nodani Mandwani 12 18 26 Sharbat Khan Ghos bhaksh Gulo saher Nodani Mandwani 10 17 27 Ilahi bhaksh Mohammad Morad Gulo saher Nodani Mandwani 18 35 28 Jan Mohammad Allah Dad Gulo saher Nodani Mandwani 15 30 29 Din Mohammad Abdul kareem Gulo saher Nodani Mandwani 12 35 30 Mohammad akhbar saleh Mohammad Gulo saher Nodani Mandwani 18 35 31 Abdul Kabire abdul Raheem Gulo saher Nodani Mandwani 8 18 32 Bashir Ahamd Mohammad ishaq Gulo saher Nodani Mandwani 15 35 33 Rabnawaz Mohammad ishaq Gulo saher Nodani Mandwani 10 35 34 Mohammad Aazeem Mohammad ishaq Gulo saher Nodani Mandwani 22 35 35 Malak Abdullah Abdul Ghani Gulo saher Nodani Mandwani 9 150 36 Sakar Khan Karam Khan Gulo saher Nodani Mandwani 11 80 37 Abdul Ghafor Abdul haleem Gulo saher Nodani Mandwani 25 35 38 Ator Khan umar Khan Gulo saher Tareen Nodani 10 100 39 Haji ismail Khan Aamir Khan Gulo saher Tareen Nodani 17 100 40 Mohammad iqbal Yousf Khan Gulo saher Tareen Nodani 12 150 41 Haji Akbar Khan kamal Khan Gulo saher Tareen Nodani 20 200 42 Malak Muladad Gul Mohammad Gulo saher Tareen Nodani 10 300 43 Dr khalid seaad Sardar Bahar Khan Gulo saher Tareen Nodani 25 100 44 Mohammad Ismail Mohammad Usman Gulo saher Khajak Usmani 10 600 45 Mohammad Akbar Mohammad Usman Gulo saher Khajak Usmani 5 600 46 Mohammad Yousaf Abdul Rahman Killi Jafarzai Khajak Jafarzai 9 150 47 Abdul Majeed Sadiqe Killi Jafarzai Khajak Jafarzai 8 100 48 Mohammad hameed Hazad Khan Killi Jafarzai Khajak Jafarzai 10 120 49 Haji Yaqoob Khan Mohammad Husan Killi Jafarzai Khajak Jafarzai 7 250 50 Niaz Mohammad Abdul kareem Killi Jafarzai Khajak Jafarzai 7 200 51 Mohammad hasan Din Mohammad Killi Jafarzai Khajak Jafarzai 6 200 52 Haji fatay mussa Khan Killi Jafarzai Khajak Jafarzai 7 150 53 Mussa Khan Karam Khan Killi Jafarzai Khajak Jafarzai 8 150 54 karam Khan Faqeer Khan Killi Jafarzai Khajak Jafarzai 10 200 55 Haji Dost Mohammad Haji Mohammad umar Killi Jafarzai Khajak Jafarzai 12 300 56 Allah Dina Allah Dad Killi Jafarzai Khajak Jafarzai 10 100 57 Mohammad Akram Mohammad Husan Killi Jafarzai Khajak Jafarzai 9 120 58 Din Mohammad Mohammad umar Killi Jafarzai Khajak Jafarzai 6 120 59 Saeed Khan Mohammad Usman Killi Jafarzai Khajak Jafarzai 5 200 60 Haji Abdullah Haji Essa Khan Killi Jafarzai Khajak Jafarzai 7 200 61 Haji Qahim Khan Mohammd Khan Killi Jafarzai Khajak Jafarzai 8 200 62 Meata Khan Ghulam rasool Bakhash Killi Jafarzai Khajak Jafarzai 8 150 63 Abdul ghafar Chakar Khan Killi Jafarzai Khajak Jafarzai 10 100 64 Haji khudaidad Haji Samad jan Behramzai Khajak Behramzai 3 135 65 Shair Mohammad Khalil Khan Behramzai Khajak Behramzai 8 115 66 Mohammad Azeem Noor Mohammad Behramzai Khajak Behramzai 22 206 67 Malik Ahmad Khan Malik ali Khan Behramzai Khajak Behramzai 16 370 68 Saeed Ahmad Abdullah Behramzai Khajak Behramzai 12 85 69 Hussain Khan Ismail Khan Behramzai Khajak Behramzai 14 124 70 Mohammad Yaqoob Haji khudaiada Behramzai Khajak Behramzai 19 216 71 Mohammad umar Mohammad Khan Behramzai Khajak Behramzai 9 205 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-E [13/17] 72 Merza Khan Noor Mohammad Behramzai Khajak Behramzai 16 225 73 Ahmad Khan Hasal Khan Behramzai Khajak Behramzai 12 226 74 Raza Mohammad Mehmood Khan Behramzai Khajak Behramzai 13 235 75 Dost Mohammad Mohammad Usman Behramzai Khajak Behramzai 16 206 76 Allah Dina Fateh Khan Behramzai Khajak Behramzai 14 225 77 Ghulam Mohammd Zahir Khan Behramzai Khajak Behramzai 15 223 78 Mazar khah Abdullah Khan Behramzai Khajak karyazai 9 145 79 Nazar Mohammad ShakeuDin Behramzai Luni Luni 11 85 80 Sheakh Mohammad Amir sheakh Mohammad Usman Behramzai Khajak Behramzai 12 222 81 Khudaidad Mohammad ismail Khan Hamemzai Khajak Hameemzai 6 6300 82 Shahbaz Khan (late) Ghulam Mustafa Hamemzai Khajak Hameemzai 6 349 83 Abdul Sattar Haji raheem Khan Hamemzai Khajak Hameemzai 20 129 84 Haji meta Khan Yaqoob Khan Hamemzai Khajak Hameemzai 3 293 85 Babu Allah dad Saadullah Hamemzai Khajak Hameemzai 6 79 86 shakar Khan Juma Khan Hamemzai Khajak Hameemzai 5 1179 87 Muheem Khan Ghulam Mustafa Hamemzai Khajak Hameemzai 8 349 88 Hakeem Khan shaki Ahmad Khan Hamemzai Khajak Hameemzai 14 1160 89 Azeem Khan Issa Khan Hamemzai Khajak Hameemzai 8 209 90 panja Khan Arbaba Khan Hamemzai Khajak Hameemzai 4 129 91 Mussa Khan Yaqoob Khan Hamemzai Khajak Hameemzai 12 169 92 Mir Mohammad Fateh Khan Hamemzai Khajak Hameemzai 5 79 93 yousaf Khan Fateh Khan Hamemzai Khajak Hameemzai 4 195 94 Ayub Khan Mohammad Khan Hamemzai Mari Gozani 7 238 95 Ikhtair Khan Ahmad Khan Hamemzai Khajak Hameemzai 13 1159 96 Nasir Khan israr Khan Hamemzai Mari Gozani 10 375 97 Rashid Khan Karam Khan Hamemzai Khajak Hameemzai 13 159 98 Ghani Khan wazir Khan Hamemzai Khajak Ishaqzai 8 959 99 Malik karam Khan pakar Khan Hamemzai Khajak Jafarzai 9 489 100 Abdullah Khan Raheem-u-Din Hamemzai Khajak Hameemzai 12 209 101 Mohammad Dostan Mohammad Khan Hamemzai Khajak Jafarzai 7 589 102 Abdul Sattar Haji razaq Khan Hamemzai Khajak Hameemzai 20 129 103 Mohammad hayat Mohammad umar Hamemzai Khajak Salihzai 13 68 104 Mussa Khan Mula dad Salihzai Khajak Salihzai 6 69 105 Raza Mohammad Abdullah Salihzai Khajak Salihzai 15 51 106 Mustafa Khan shear Mohammad Salihzai Khajak Salihzai 9 22 107 Mir Khan Mohammad Khan Salihzai Khajak kamalzai 6 57 108 Mohammad Khan Noor Mohammad Salihzai Khajak mubarkzai 11 59 109 Malik Ahmad Khan Muheem Khan Salihzai Khajak kamalzai 9 101 110 Imada marri Abdul razaq Salihzai Khajak kamalzai 13 63 111 Doda Khan Abdul Kabir Salihzai Khajak mubarkzai 6 43 112 Mohammad umar Abdul hakeem Salihzai Khajak syed 8 62 113 Raza Mohammad Karam Khan Salihzai Khajak Behramzai 11 43 114 Mohammad Azeem dad Mohammad Salihzai Khajak mubarkzai 8 59 115 Shah Mohammad M Raheem Salihzai Khajak mubarkzai 11 74 116 Mohammad Aslam Allah Dad Salihzai Khajak mubarkzai 8 65 117 Fateh Mohammad Mohammad ameen Salihzai Khajak Salihzai 10 63 118 Abdul Rehman Mohammad yousof Salihzai Khajak Salihzai 9 58 119 Mohammad Ishaq Roze Khan Salihzai Khajak mubarkzai 7 104 120 Mohammad hussan Gul Mohammad Salihzai Khajak Salihzai 7 34 121 Salah Mohammad Gul Mohammad Salihzai Khajak Salihzai 6 34 122 Niaz Mohammad Mohammad umar Salihzai Khajak mubarkzai 3 47 123 Haji Dur Mohammad Mohammad Yaqoob Salihzai Khajak mubarkzai 12 64 124 Allah Dina Allah Dad Salihzai Khajak Zaluzai 9 60 125 Mohammad Anwar Mohammad Sadiqe Salihzai Khajak Zaluzai 7 73 126 Allah Dina Sharee Mohammad Salihzai Khajak kamalzai 10 50 127 Mustafa Khan Ahmad Khan Salihzai Khajak kamalzai 11 51 128 Khuda Bakhsh Mohammad Yaqoob Salihzai Khajak malazai 5 58 129 Ghulam rasool Mohammad Yaqoob Salihzai Khajak malazai 8 58 130 Abdul hameed Mohammad yousof Ishaqzai Khajak Ishaqzai 8 98 131 Haji Mehmood Khan shadi Khan Ishaqzai Khajak Ishaqzai 10 215 132 Ashraf Khan Yar Mohammad Ishaqzai Khajak Ishaqzai 11 97 133 Ejaz Khan Ghulam sarwar Ishaqzai Khajak Ishaqzai 6 193 134 Amjed Khan Haji Babak Ishaqzai Marri Langani 5 85 135 Abdullah Khan Mohammad Yaqoob Ishaqzai Khajak mubarkzai 8 135 136 Obedullah Khan Habib Khan Ishaqzai Khajak Ishaqzai 10 112 137 Wazir Khan adam Khan Ishaqzai Khajak Ishaqzai 8 97 138 orangzaib Ghani Khan Ishaqzai Khajak Ishaqzai 7 245 139 Abdul Sattar Abdul Kabir Ishaqzai Khajak Ishaqzai 7 218 140 Raiz Ahmad Shakar Khan Ishaqzai Khajak Ishaqzai 4 119 141 Mohammad Farooq Abdul Aziz Ishaqzai Khajak Ishaqzai 20 124 142 Khan Mohammad Muhizullah Ishaqzai Khajak Ishaqzai 11 170 143 Saadullah Khan Haji saleem Ishaqzai Khajak kethram 9 186 144 Khan Mohammad M Azeem Ishaqzai Khajak Zaluzai 9 114 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-E [14/17] 145 Mohammad Khan Shakar Khan Ishaqzai Khajak Arain 13 135 146 Mohammad Ismail Dur Mohammad Ishaqzai Khajak Ishaqzai 11 144 147 Sahib Khan Fazal Khan Ishaqzai Khajak Ishaqzai 11 84 148 Mohammad Khan Arbaba Khan Ishaqzai Khajak Ishaqzai 2 109 149 shakar Khan Arbaba Khan Ishaqzai Khajak Ishaqzai 7 131 150 Mesri Khan shakar Khan Ishaqzai Khajak Ishaqzai 4 131 151 Taj Mohammad Mohammad Sadiqe Ishaqzai Khajak Ishaqzai 13 131 152 Wali Mohammad Gul Mohammad Ishaqzai Khajak Ishaqzai 9 131 153 Wazir Khan Haji mohammmad Ishaqzai Khajak Ishaqzai 11 98 154 Allah dad Malik Khan Ishaqzai Khajak Ishaqzai 10 85 155 Mohammad Aslam Khair Mohammad Ishaqzai Khajak Ishaqzai 5 84 156 Ejaz Khan Ghulam sarwar Ishaqzai kethran kethran 6 193 157 Abdul haaq Kalu Khan Ishaqzai Khajak Ishaqzai 14 96 158 Azad Khan Saeed Khan Ishaqzai Khajak Ishaqzai 11 109 159 Mir Khan Mohammad hussain Dolatzai Khajak Dolatzai 13 246 160 Mohammad ibrahim Mohammad hussain Dolatzai Khajak Dolatzai 8 206 161 Rashid Khan Juma Khan Dolatzai Khajak Dolatzai 15 321 162 Malik Mustafa Khan Malik Ahmad Khan Dolatzai Khajak Dolatzai 17 170 163 Abdul Qadir Mula Mohammad Dolatzai Khajak malazai 20 153 164 Essa Khan Abdul Kabir Dolatzai Khajak Dolatzai 12 114 165 Mohammad umar Mohammad hussain Dolatzai Khajak malazai 13 123 166 Din Mohammad Bukhsa Khan Dolatzai Khajak Ishaqzai 8 134 167 Mohammad Aslam jan Mohammad Dolatzai abroo detha 5 83 168 Mohammad Khan Raheem Khan Dolatzai Khajak Dolatzai 15 124 169 mola Dad Saeed Khan Dolatzai Khajak mubarkzai 13 113 170 Ghulam Mustafa Mohammad ishaq Dolatzai Khajak mubarkzai 8 96 171 Mohammad hussain Haji Ali Mohammad Dolatzai Khajak mubarkzai 19 115 172 Yaqoob Mohammad hussain Dolatzai Khajak Dolatzai 8 320 173 Mohammad hussain Mula Mohammad Dolatzai Khajak malazai 20 197 174 Syed kundal shah syed hakeem shah Dolatzai syed Bukhari 9 127 175 syed Mehmood shah syed Ghulam shah Dolatzai syed Bukhari 8 128 176 Abdul Qadir Methul Khan Dolatzai Khajak mubarkzai 15 157 177 Haji abdul rehman Haji Abdul Nafay Dolatzai Luni Luni 17 170 178 Zahiir Marri Dawood marri Dolatzai Marri Gozani 10 255 179 Rashid Ahmad Mohammad ameen Jum umarzai Khajak Jum umarzai 7 90 180 Ghulam Mustafa Shakar Khan Jum umarzai Khajak Jum umarzai 13 96 181 Raza Mohammad Abdul ghafor Jum umarzai Khajak Jum umarzai 7 50 182 Azeem Khan Mohammad ameen Jum umarzai Khajak Jum umarzai 4 72 183 Lal Mohammad Mohammad ameen Jum umarzai Khajak Jum umarzai 6 32 184 Nazar Mohammad Karam Khan Jum umarzai Khajak Jum umarzai 10 91 185 Sadiqe Khan Aitabar khah Jum umarzai Khajak Jum umarzai 8 32 186 Abdul khaliq Mohammad Khan Jum umarzai Khajak Jum umarzai 29 219 187 Habib Khan Mohammad ismail Khan Jum umarzai Khajak Jum umarzai 16 42 188 Sharee Mohammad Mohammad Yaqoob Jum umarzai Khajak Jum umarzai 10 96 189 Hafeez Khan Khalil razaq Jum umarzai Khajak Jum umarzai 5 96 190 Abdul qader Easab Khan Jum umarzai Khajak Jum umarzai 10 131 191 Jan Mohammad khuda Bakhsh Jum umarzai Khajak Jum umarzai 6 48 192 Allah Dina Aitabar khah Jum umarzai Khajak Jum umarzai 8 32 193 Mohammad Hizat Aitabar khah Jum umarzai Khajak Jum umarzai 9 32 194 Faiz Mohammad Abdul kareem Jum umarzai Khajak Jum umarzai 6 30 195 Dilawar Khan Essa Khan Jum umarzai Khajak Jum umarzai 4 45 196 Mohammad Yaqoob Essa Khan Jum umarzai Khajak Jum umarzai 9 45 197 Abdulah Khan Essa Khan Jum umarzai Khajak Jum umarzai 13 35 198 Niyaz Mohammad Juma Khan Jum umarzai Khajak Jum umarzai 8 105 199 Abdul Rehman Abdul rehmeem Jum umarzai Khajak Jum umarzai 35 110 200 Mohammad sediqe Aitabar khah Jum umarzai Khajak Jum umarzai 5 110 201 inayatullah Shah Mohammad Jum umarzai Khajak Jum umarzai 4 90 202 Khudad Khan Abdul razaq Jum umarzai Khajak Jum umarzai 11 90 203 Malik Noor Mohammad Malik mirza Khan Jum umarzai Khajak Jum umarzai 9 78 204 Mehmood Khan Akhtyr Khan Jum umarzai Khajak Jum umarzai 7 42 205 Mehrab Khan Akhtyr Khan Jum umarzai Khajak Jum umarzai 5 32 206 Dost Mohammad Akhtyr Khan Jum umarzai Khajak Jum umarzai 4 42 207 Malik hazar Khan Malik Abdul raheem Jum umarzai Khajak Jum umarzai 7 75 208 Mohammad hussain Akhtyr Khan Jum umarzai Khajak Jum umarzai 10 32 209 Khair Mohammad Akhtar Khan Jum umarzai Khajak Jum umarzai 3 32 210 Allah Dina Mohammad raheem karyzai Khajak Behramzai 16 119 211 Mohammad Anwar Haji jandal karyzai Luni Luni 11 378 212 Anwar Shah Yaqoob shah karyzai Khajak umarzai 11 133 213 Mohammmad hussain Qayom Khan karyzai Khajak karyazai 20 119 214 Ismail Khan Mohammad ishaq karyzai Khajak karyazai 16 219 215 Mehmood Khan Abdul ghafor karyzai Khajak Ishaqzai 18 239 216 Sahid Khan Raheem Khan karyzai Khajak karyazai 11 215 217 Mir Ahmad Issa Khan karyzai Khajak karyazai 13 228 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-E [15/17] 218 Rashid Khan Haji musawir karyzai Khajak karyazai 15 379 219 Maen Khan Mohammad ishaq karyzai Khajak karyazai 10 219 220 Zahir Khan Ahsanullah karyzai Maree Gozani 10 267 221 Yaqoob Khan Yar Mohammad karyzai Maree Gozani 12 113 222 Bilal Khan Mula Ahmad karyzai Maree Gozani 4 125 223 Abdul Kabire Qaim Khan karyzai Maree Gozani 8 125 224 Habib Khan Mohammad ismail karyzai Maree Gozani 8 89 225 Mohammad Azeem M Ibrahim karyzai Maree Gozani 8 113 226 Malik Mazar Khan Malik Abdullah Khan karyzai Maree Gozani 9 239 227 Mohammad umar Mohammad Ismail karyzai Maree Gozani 19 112 Total 2301 41333 Kurak Scheme Household Information Total Land S.No. Name of Head of Father’s Name of the Head of Family Owned Name of Village Tribe Clan Household Household Size by Family (acres) 1 Ghous Bux Elahi Bux Kurak Kurak lalozai 6 38 2 m. Younas kamal Khan Kurak Kurak lalozai 4 38 3 M Anwar Rasool Bux Kurak Kurak Mehmoodzai 6 76 4 Mehboob Khan Rasool Bux Kurak Kurak Khail Band 6 76 5 Abdul Qadeer Rasool Bux Kurak Kurak Khail Band 6 76 6 Abdul Sattar M Umer Kurak Kurak Khail Band 12 76 7 M Alam Rahim Khan Kurak Kurak Khail Band 10 76 8 saeed Khan jamal Khan Kurak Kurak Khail Band 8 114 9 Wazir Khan fathe Khan Kurak Kurak Khail Band 3 38 10 munir Ahmad Wazir Khan Kurak Kurak Khail Band 3 76 11 Mohabat Khan Wazir Khan Kurak Kurak Khail Band 5 76 12 M rafiq azad Khan Kurak Kurak Baroozai 8 154 13 M. Younas M. Nawaz Kurak Kurak Baroozai 8 154 14 sajid Ahmad Ghulam Rasool Kurak Kurak Baroozai 8 154 15 amanullah Khan Rashid Khan Kurak Kurak Baroozai 6 154 16 inayathullah Khan Essa Khan Kurak Kurak Baroozai 10 154 17 Abdul Haq Rashid Khan Kurak Kurak Baroozai 10 154 18 Bakhair Khan Ibrahim Khan Kurak Kurak Baroozai 8 154 19 saeed Khan Mustafa Khan Kurak Kurak Baroozai 6 938 20 samandar Khan Mustafa Khan Kurak Kurak Baroozai 6 940 21 baro Khan samad Khan Kurak Kurak Baroozai 4 940 22 Dr Ghos Bux sardar Mohmmad Khan Kurak Kurak Baroozai 6 950 23 Din mohmmad Mohmmad Jan Kurak Kurak Mehmoodzai 3 76 24 Jan Mohammad Yar Mohammad Kurak Kurak Mehmoodzai 10 76 25 ibrahim Allah bux Kurak Kurak Mehmoodzai 8 76 26 Mola dad Hazoor bux Kurak Kurak Mehmoodzai 4 76 27 Mola dad Hazoor bux Kurak Kurak Mehmoodzai 3 70 28 ali Khan khair bux Kurak Kurak Mehmoodzai 8 158 29 Hazoor bux khair bux Kurak Kurak Mehmoodzai 12 152 30 shah Mohammad khair bux Kurak Kurak Mehmoodzai 7 152 31 Malik Ghulam rasool khair bux Kurak Kurak Mehmoodzai 6 152 32 niaz Mohammad aziz Khan Kurak Kurak Mehmoodzai 4 114 33 M saleem Khudai dad Kurak Kurak lalozai 16 76 34 samad Khan karam Khan Kurak Kurak lalozai 10 80 35 Malik Noor Mohammad Abdul Qadir Kurak Kurak lalozai 3 114 36 shakar Khan bahar Khan Kurak Kurak lalozai 10 456 37 ismail Khan Abdul Qadir Kurak Kurak lalozai 10 90 38 Abdul Ghani Khair Mohammad Kurak Kurak lalozai 13 70 39 M Hayath Khair Mohammad Kurak Kurak lalozai 12 80 40 M alim Hazoor bux Kurak Kurak lalozai 12 114 41 Malik Dad bahar Khan Kurak Kurak lalozai 6 456 42 gul Mohammad Abdul Qadir Kurak Kurak lalozai 17 200 43 Khan Mohammad Haji Khan Kurak Kurak lalozai 10 152 44 Aziz Khan Abdul Qadir Kurak Kurak lalozai 10 150 45 Malik Noor Mohammad Abdul Qadir Kurak Kurak lalozai 5 100 46 nazar Mohammad Malik Abdul Qadir Kurak Kurak lalozai 3 38 47 sardar Ghos Bakhsh sardar Murad Khan Baroozai Kurak Kurak Baroozai 8 1500 Total 359 10384 Luni Scheme Household Information Total S.No. Name of Head of Father’s Name of the Head of Family Land Name of Village Tribe Clan Household Household Size Owned by Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-E [16/17] Family (acres) 1 Saifullah Khan Misri Khan luni Luni Badozai 16 250 2 Haji Abdul Rehman Ahmad Khan luni Luni Badozai 15 250 3 Haji Mahmood Khan Misri Khan luni Luni Badozai 12 310 4 Abdul Aziz sayedal Khan luni Luni Badozai 11 314 5 Bibi Shahzadi Nasurllah Khan luni Luni Badozai 2 300 6 Abdul Rashid Mustafa Khan luni Luni Badozai 19 350 7 Khan Bibi Dawood Khan luni Luni Badozai 5 350 8 Mohammad Hussain Haji Murad Khan luni Luni Badozai 8 120 9 Asadullah Khan Haji Murad Khan luni Luni Badozai 25 120 10 Haji Abdul Sattar Mohammad Khan luni Luni Badozai 15 120 11 Mohammad Usman Mohammad Khan luni Luni Badozai 20 120 12 Dr Allah Dad Haji Murad Khan luni Luni Badozai 4 120 13 Mohammad Yaqoob Haji Murad Khan luni Luni Badozai 10 120 14 Abdul Razzaq Haji Murad Khan luni Luni Badozai 4 120 15 Dr Ismail Haji Murad Khan luni Luni Badozai 4 120 16 Abdul Saeed Yar Mohammad luni Luni Shadozai 11 3 17 Mohammad Yaqoob Shorab luni Luni Sakizai 32 8 18 Allah Bux Abdul Ghafoor luni Luni Sakizai 8 10 19 Abdul Aziz Abdul kareem luni Luni Sakizai 10 10 20 Abdul Wahab Abdul Rehman luni Luni Sakizai 5 5 21 Saeed Khan Abdul Rehman luni Luni Sakizai 12 4 22 Haji Dost Mohammad Shadi Khan luni Luni Sadozai 12 3 23 Shah Nawaz Mahboob Khan luni Luni Badozai 6 5 24 Misri Khan Mahboob Khan luni Luni Badozai 6 5 25 Naseeb ullah Abdul Hakeem luni Luni Badozai 3 3 26 Abdul Hakeem Abdul kareem luni Luni Badozai 3 5 27 Amir Loni Mohammad hussain luni Luni Badozai 4 6 28 Mohammad hussain Mohammad Ibrahim luni Luni Badozai 5 8 29 Zafarullah Khan Mohammad Ismail luni Luni Badozai 4 12 30 Mohammad Ismail Mohammad kamil luni Luni Badozai 4 20 31 Mohammad Ibrahim Noor Mohammad luni Luni Pathozai 4 8 32 M. Ajmal Rasool Bux luni Luni Pathozai 3 4 33 Mohammad Afzal Rasool Bux luni Luni Pathozai 3 9 34 Rasool Bux Mohammad kamil luni Luni Pathozai 7 9 35 Imran Abdul Hakeem luni Luni Badozai 4 4 36 Mohammad Yousaf Mohammad Ismail luni Luni Badozai 6 12 37 Mohammad kamil Mohammad Ismail luni Luni Badozai 6 12 38 Abdul Ghafaar Dani Bux luni Luni Badozai 4 10 39 Mohammad Hayaat Mohammad Ibrahim luni Luni Badozai 4 5 40 Mohammad Azam Mohammad Ibrahim luni Luni Badozai 6 5 41 Murtaza Mustafa luni Luni Badozai 8 8 42 Allah Dad Khuda Bux luni Luni Badozai 4 5 43 Yaqoob Allah Bux luni Bugti 8 8 44 Abdul Sattar Sattar Khan luni Luni Badozai 9 6 45 Samad Khan Mohammad Ibrahim luni Luni Badozai 4 2 46 Mohammad Aslam Mohammad Ibrahim luni Luni Badozai 4 2 47 Noor Mohammad Mohammad Ibrahim luni Luni Badozai 4 2 48 Ahmad Khan Shahbaaz Khan luni Luni Badozai 12 20 49 Abdul Hakeem Abdul kareem luni Luni Badozai 25 15 50 Musa Khan Abdul Razzaq luni Luni Badozai 12 15 51 Khuda Dad Malik Dad luni Luni Badozai 5 55 52 Ghulam Rasool Abdul Rashid luni Luni Sakizai 10 45 53 Afzal Khan Arbab Khan luni Luni Badozai 14 28 54 Mohammad Asghar Malik Dad luni Luni Badozai 2 15 55 Mir Mohammad Khaliq Dad luni Luni Nakazai 12 4 56 Dost Mohammad Mohammad Azam luni Luni Nakazai 7 12 57 Sahib Dad Abdul Qadir luni Luni Nakazai 7 8 58 Farman Abdul Qadir luni Luni Nakazai 5 8 59 Imdad Abdul Qadir luni Luni Nakazai 4 8 60 Ghulam Sarwar Azmat Khan luni Luni Nakazai 8 4 61 Rasool Bux Azmat Khan luni Luni Nakazai 3 4 62 Parwize Azmat Khan luni Luni Nakazai 4 4 63 Dur Mohammad Mirza Khan luni Luni Nakazai 5 5 64 Aamir Ahmad Mirza Khan luni Luni Nakazai 6 5 65 Mohammad Arif Mirza Khan luni Luni Nakazai 3 5 66 Noor Mohammad Mohammad Ibrahim luni Luni Badozai 10 30 67 Khuda Bux Karam Khan luni Luni Nakazai 6 5 68 Allah Bux Karam Khan luni Luni Nakazai 8 5 69 Mian Dad Karam Khan luni Luni Nakazai 4 5 70 Abdul Razzaq Mola Dad luni Luni Nakazai 3 6 71 Allah Dad Mohammad Azam luni Luni Nakazai 6 6 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-E [17/17] 72 Shah Murad Mola Dad luni Luni Nakazai 4 6 73 Feroz Khan Malik Dad luni Luni Badozai 2 30 74 Malik Dad Moman Khan luni Luni Badozai 12 170 75 Mohammad Ibrahim Mohammad Azeem luni Safi kamalzai 9 180 76 Musa Khan Abdul Hakeem luni Safi kamalzai 3 180 77 Manzoor Ahmad Hazoor Bux luni Safi kamalzai 9 180 78 Ali Khan Dad Mohammad luni Safi kamalzai 15 180 79 Malik Luqmaan Ahmad Khan luni Safi kamalzai 20 350 80 Mohammad Afzal Dur Mohammad luni Safi kamalzai 15 180 81 Azad Khan H Suraab Khan luni Safi kamalzai 14 180 Total 667 5255 Marghzani Scheme Household Information Total Land S.No. Name of Head of Father’s Name of the Head of Family Owned Name of Village Tribe Clan Household Household Size by Family (acres) 1 Bakhtiar Khan Imam Bux Marghzani Marghzani Shudanzai 17 50 2 Din Mohammad Qamar jan Marghzani Marghzani Shudanzai 7 70 3 Mehras Khan Peer Bux Marghzani Marghzani Shudanzai 13 98 4 Mira Bux Dost Mohammad Marghzani Marghzani Shudanzai 18 98 5 Aman ullah Mian Khan Marghzani Marghzani Shudanzai 3 70 6 Malik Faqir Mohammad Malik Noor Din Marghzani Marghzani Shudanzai 13 180 7 Abdullah Mohammad Khan Marghzani Marghzani Shudanzai 9 170 8 Allah dad Qaim Khan Marghzani Marghzani Shudanzai 9 98 9 Mohammad Idrees Ghulam jan Marghzani Marghzani Shudanzai 2 30 10 Azad Khan Abdul Rehman Marghzani Marghzani Shudanzai 17 53 11 Qadir Bux Mohammad hussain Marghzani Marghzani Shudanzai 11 30 12 Moula Bux wali Mohammad Marghzani Marghzani Shudanzai 17 18 13 Qadir Bux Bahur Khan Marghzani Marghzani Shudanzai 22 280 14 Amar Bux Mohammad hussain Marghzani Marghzani Shudanzai 8 74 15 Abdul Ghani Pokar Khan Marghzani Marghzani Shudanzai 19 22 16 Naseer Ahmad Mohammad hussain Marghzani kirak Usmani 8 600 17 Abdul Latif Mohmaal Marghzani Marghzani Shudanzai 27 65 18 Mohammad Iqbal Zahro Khan Marghzani Marghzani Shudanzai 4 98 19 abdul Razaq Mohammad Qasim Marghzani Marghzani Shudanzai 6 49 20 Abdul Wahab Ghous Bux Marghzani Marghzani Shudanzai 22 49 21 Malik Hadi Bux Mohammad Alam Marghzani Marghzani Shudanzai 10 180 22 Mohammad Yousaf Mubarak Khan Marghzani Marghzani Shudanzai 11 49 23 Abdul Rahim Alahi Bux Marghzani Marghzani Shudanzai 18 90 24 Yar Mohammad Bakhtiar Khan Marghzani somro Somro 15 5 25 Dilbar Mohammad Suleman Marghzani Marghzani Shudanzai 3 98 26 Hazoor Khan Mohammad Afzal Marghzani Marghzani Shudanzai 14 25 27 Abdul Rehman Ghulam Mohammad Marghzani somro Somro 13 5 28 Qadir Bux Ahmad Khan Marghzani Marghzani Shudanzai 22 65 29 Abdul Rehman Hazoor Khan Marghzani Marghzani Shudanzai 34 80 30 Nisar Ahmad Mohammad hussan Marghzani somro Somro 6 25 31 Mohammad Aslam Abdullah Marghzani somro Somro 7 2 32 Farooq Khan Qadir Bux Marghzani somro Somro 8 5 33 Zakrya kansi Malik Yahya kansi Marghzani kansi Kansi 8 120 34 Abdul Ghani mengal Majeed mengal Marghzani Mengal Mengal 10 75 35 Abdul Latif Mohammad Nawaz Marghzani Marghzani Bostanzai 14 58 36 Mohammad Essaq Raza Mohmmad Mizri Mizri kar Khail 20 200 37 Mohammad Khan Haji Khan Mizri Mizri kar Khail 12 50 38 Saleh Mohammad Mian Khan Mizri Mizri kar Khail 8 60 39 Shah Mohammad Bawal Khan Mizri Mizri kar Khail 18 50 40 Mohammad Hassan Mohammad Ali Mizri Mizri kar Khail 30 100 41 Karam Khan Karam Khan Mizri Mizri kar Khail 10 60 42 Moula Dad Gul Mohammad Mizri Mizri kar Khail 10 60 43 Faiz Mohammad Atta Mohammad Mizri Mizri kar Khail 7 100 44 Ali Mohammad Mohammad Alam Mizri Mizri kar Khail 8 100 45 Akhtyar Khan Doda Khan Mizri Mizri kar Khail 6 100 46 Ali Khan Khair Bux Mizri Mohmmadzai Mohmmdzai 10 250 47 Hazoor Bux Khair Bux Mizri Mohmmadzai Mohmmdzai 13 250 48 Mohammad Nawaz Mazaro Khan Mizri Gashkori Afani 15 300 49 Sai Dad Abdul Aziz Mizri Mizri kar Khail 12 60 50 Haji Muhabat Khan Haji Sikandar Khan Mizri Barozai Barozai 10 300 51 Nilai Bux Mizri chishti Syed 20 90 52 Gul Mohammad shah Mohammad Mizri Mizri kar Khail 12 70 53 Fateh Khan Saadullah Mizri Barozai Barozai 10 200 54 Shair Khan Mohammad Ibrahim Mizri Marghzani KhanKhail 7 60 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-E [2/17] 55 Dr Jamal Noor Ahmad Muree Mizri Marri Marri 10 90 Total 693 5634 Grand Total 5387 73784 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-F [1/12] Annexure F: Household Information Total Land Family Size Sr. Owned by Father’s Name of the Female Name of Head of Total Male No. Tribe Clan Family Household Head of Household (acres) 1 A- Sadiq Khan A Razak Khan Tareen Musyani 12 8 20 50 2 Mohammad Anwar Musa Jan Tareen Musyani 2 3 5 120 3 Akbar Musa Jan Tareen Musyani 2 4 6 120 4 Habibullah Jan Ameer Jan Tareen Musyani 12 7 19 160 5 Sher Jan Haji Sahib Jan Tareen Musyani 5 6 11 280 6 Mohammad wakeel Mohammad Azeem Tareen Musyani 7 8 15 235 7 Dur Mohammad Paroz Khan Tareen Musyani 12 15 27 80 8 Abdul Wakeel Abdul Aziz Tareen Musyani 4 4 8 120 9 Master Jalil Abdul Aziz Tareen Musyani 7 6 13 260 10 Mohammad din Mohammad Saleem Tareen Musyani 3 4 7 150 11 Mohammad alam Abdul haleem Tareen Musyani 5 4 9 160 12 Abdul Wazir Musa Kalim Tareen Musyani 4 4 8 45 13 Abdul Kabir Mohammad ibrahim Tareen Musyani 6 4 10 50 14 Abdul Kareem Mohammad ibrahim Tareen Musyani 4 3 7 45 15 Abdul Latif Mohammad ibrahim Tareen Musyani 4 5 9 45 16 Abdul Basir Mohammad ibrahim Tareen Musyani 5 9 14 40 17 Abdul Nazir Mohammad ibrahim Tareen Musyani 3 5 8 40 18 Habibullah Alam Khan Tareen Musyani 1 10 11 0 19 Azeem Jan Abdullah Jan Tareen Musyani 8 7 15 240 Master Zafarullah 20 Jan Haji Mohammad Jan Tareen Musyani 10 13 23 245 21 Haji Tahir Jan Haji Mohammad Jan Tareen Musyani 7 9 16 245 22 Haji Sadiq Jan Haji Mohammad Jan Tareen Musyani 10 18 28 385 23 Allah Dad Agha Jan Tareen Musyani 3 5 8 60 24 Haji Abdullah Jan Haji Mohammad Jan Tareen Musyani 20 32 52 370 25 Haji Meera Jan Saeed Mohammad Tareen Musyani 21 19 40 50 26 Kareem dad Agha Jan Tareen Musyani 4 2 6 50 27 Abdul Malik Abdul Hakeem Tareen Musyani 4 5 9 56 28 Abdullah Mohammad din Ustrani Ustrani 4 4 8 55 29 Hameed ullah Mohammad din Ustrani Ustrani 2 5 7 60 30 Qadir Khan Bahadur Khan Ustrani Ustrani 2 3 5 35 31 Nasir Khan Sultan shah Ustrani Ustrani 3 3 6 50 32 Zahir Din Nasar Din Ustrani Ustrani 4 4 8 42 33 Baz Mohammad Din Mohammad Ustrani Ustrani 9 9 18 40 34 Badar Ud Din Dur Mohammad Ustrani Ustrani 4 6 10 25 35 Taj Din Dur Mohammad Ustrani Ustrani 5 3 8 25 36 Haji Siraj Din Dur Mohammad Ustrani Ustrani 2 3 5 25 37 Sahib Din Dur Mohammad Ustrani Ustrani 3 5 8 35 38 Jalal Din Dur Mohammad Ustrani Ustrani 2 5 7 55 39 Shah Mohammad Khair Mohammad Ustrani Ustrani 5 5 10 35 40 Mohammad Hassan Khair Mohammad Ustrani Ustrani 4 4 8 35 41 Gwar Khan Raz Mohammad Ustrani Ustrani 3 4 7 36 42 Faiz ullah Khan Dost Mohammad Ustrani Ustrani 2 2 4 30 43 Dad Khan Mohammad Khan Ustrani Ustrani 2 3 5 26 44 Sher Muhammd Akhtar Mohammad Ustrani Ustrani 2 3 5 60 45 Jan Mohammad Bala her Ustrani Ustrani 4 4 8 65 46 Haji Sourat Khan Gul Ustrani Ustrani 3 4 7 61 47 Jawar Peer Mohammad Ustrani Ustrani 4 4 8 65 48 Atta Mohammad Bag Mohammad Ustrani Ustrani 4 8 12 100 49 Fakeer Bag Mohammad Ustrani Ustrani 3 4 7 95 50 Qasim Mohammad Taj Mohammad Ustrani Ustrani 2 5 7 95 51 Asghar Taj Mohammad Ustrani Ustrani 4 4 8 90 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-F [2/12] 52 Shah Mohammad Taj Mohammad Ustrani Ustrani 4 2 6 100 53 Anwar Taj Mohammad Ustrani Ustrani 4 6 10 110 54 salman Jalal Aka Ustrani Ustrani 2 2 4 32 55 Taj Mohammad Ghani Ustrani Ustrani 8 12 20 290 56 Peer Mohammad Ghani Ustrani Ustrani 8 7 15 290 57 Baz Mohammad Ghani Ustrani Ustrani 7 9 16 270 58 Zahir Khan Haji Jan Khan Ustrani Ustrani 6 7 13 26 59 Roze Khan Haji Jan Khan Ustrani Ustrani 5 5 10 33 60 Ibrahim Haji Jan Khan Ustrani Ustrani 4 4 8 33 61 Haji Bahadur Khan Haji Gul Ustrani Ustrani 25 30 55 475 62 Saifullah Jan Khan Ustrani Ustrani 4 4 8 40 63 Alam Khan Dost Mohammad Ustrani Ustrani 5 6 11 30 64 Nadir Khan Bahadur Khan Ustrani Ustrani 3 4 7 45 65 Safar Khan Adam Khan Ustrani Ustrani 4 5 9 37 66 Naseebullah Khan Haji Mirza Khan Ustrani Ustrani 2 3 5 36 67 Rahmat ullah Khan Haji Sourat Khan Ustrani Ustrani 2 2 4 46 68 Paind Khan Jamal Khan Ustrani Ustrani 5 8 13 65 69 Qadir Khan Jamal Khan Ustrani Ustrani 3 5 8 55 70 Gul Khan Jamal Khan Ustrani Ustrani 2 3 5 60 71 Khur Khan Bakhtyar Khan Ustrani Ustrani 6 8 14 70 72 Musa Jan Bakhtyar Khan Ustrani Ustrani 2 6 8 95 73 KaKa Bakhtyar Khan Ustrani Ustrani 5 7 12 90 74 Natak Bakhtyar Khan Ustrani Ustrani 6 7 13 70 75 Khan Mohammad Nazar Mohammad Ustrani Ustrani 2 3 5 30 76 Shah Mohammad Gul Khan Ustrani Ustrani 7 7 14 30 77 Baz Mohammad Gul Mohammad Ustrani Ustrani 7 7 14 50 78 Khan Mohammad Dost Mohammad Ustrani Ustrani 4 10 14 55 79 Niamat ullah Khan Zahir Khan Ustrani Ustrani 2 4 6 38 80 Shaista Khan Haji Sorat Khan Ustrani Ustrani 2 2 4 45 81 Mair Ab Khan Saifullah Khan Ustrani Ustrani 4 4 8 45 82 Dost Mohammad Jaj Mohammad Tareen Musyani 3 3 6 215 83 Nora Khan Jamal Khan Tareen Musyani 5 5 10 145 84 Zareef Khan Gul Baran Tareen Musyani 8 8 16 140 85 Haji Raz Mohammad Shah Mohammad Tareen Musyani 10 12 22 145 86 Dost Mohammad Dad Mohammad Tareen Musyani 15 20 35 170 87 Amal Khan Soba Khan Tareen Musyani 14 16 30 190 88 Qalandar Shah Musa Shah Tareen Musyani 17 8 25 54 89 Saeed Mohammad Gul Mohammad Tareen Musyani 12 20 32 60 90 Mula Abdul Ghani Abdul Wahab Tareen Musyani 20 30 50 30 91 Zareef Khan juma Khan Tareen Musyani 4 5 9 320 92 Abdul Raheem Doulat Khan Tareen Musyani 7 8 15 75 93 Sikandar Khan Murad Khan Tareen Musyani 9 9 18 55 94 Dor Mohammad Gul Mohammad Tareen Musyani 5 7 12 0 95 Raz Mohammad Gul Mohammad Tareen Musyani 3 4 7 15 96 Akhtar Mohammad Gul Mohammad Tareen Musyani 5 3 8 48 97 Wali Mohammad Gul Mohammad Tareen Musyani 4 4 8 36 98 Yar Mohammad Tareen Tareen Musyani 5 5 10 37 99 Haji Nadir Khan Haji Bahadur Khan Tareen Musyani 22 18 40 400 100 M Shareef Ghazi Khan Tareen Musyani 5 3 8 250 101 Mohammad qasim Malak Behram Khan Tareen Musyani 2 4 6 240 102 malak Zaftu Khan Malak Behram Khan Tareen Musyani 10 15 25 240 103 Zaher Khan Fazal Khan Tareen Musyani 5 2 7 125 104 Mehrullah Khan Balu Khan Tareen Musyani 11 14 25 115 105 Nazar Khan Saifullah Khan Tareen Musyani 7 3 10 122 106 Haji Sohrab Khan Saifullah Khan Tareen Musyani 7 9 16 285 107 Hazar Khan Juma Khan Tareen Musyani 11 7 18 280 108 Dunya Khan Kala Khan Tareen Musyani 2 4 6 204 109 Shair Mohammad Kala Khan Tareen Musyani 6 4 10 205 110 Jan Mohammad Khair Mohammad Tareen Musyani 2 5 7 100 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-F [3/12] 111 Ali Mohammad Khair Mohammad Tareen Musyani 7 2 9 100 112 Nazar Mohammad Khair Mohammad Tareen Musyani 2 4 6 100 113 Noor Mohammad Isa Khan Tareen Musyani 3 5 8 65 114 Fatah Mohammad Mohammad Usman Ustrani Ustrani 1 2 3 335 115 Malak Amir Khan Malak Abdul Rahman Ustrani Ustrani 20 20 40 570 116 Fazal Mohammad Dil Jaan Ustrani Ustrani 13 12 25 580 117 Nazar Gull Dil Jaan Ustrani Ustrani 8 12 20 70 Molvi Syed 118 Mohammad Din Mohammad Ustrani Ustrani 4 6 10 0 119 Mera Jaan Khudaidad Ustrani Ustrani 8 7 15 60 120 Peer Mohammad Dost Mohammad Ustrani Ustrani 10 20 30 230 121 Abdullah Mohammad Usman Ustrani Ustrani 2 3 5 285 122 Hameedullah Mohammad Usman Ustrani Ustrani 7 5 12 275 123 Syedan Mohammad Usman Ustrani Ustrani 2 3 5 280 124 Din Mohammad Mohammad Usman Ustrani Ustrani 5 8 13 275 125 Abdul Manan Mohammad Usman Ustrani Ustrani 3 3 6 490 126 Raaz Mohammad Lala Ustrani Ustrani 4 6 10 55 127 Abdullah Mohammad Ali Ustrani Ustrani 10 10 20 32 Malak Faqeer 128 Mohammad Abdul Rahman Ustrani Ustrani 7 8 15 330 129 Tawab Shah Wali Mohammad Ustrani Ustrani 2 3 5 50 130 Jalal Shah Wali Mohammad Ustrani Ustrani 4 4 8 55 131 Hassan Shah Wali Mohammad Ustrani Ustrani 4 6 10 55 132 Dad Shah Wali Mohammad Ustrani Ustrani 6 9 15 60 133 Niaz Mohammad Yaar Mohammad Ustrani Ustrani 8 8 16 40 134 Wali Mohammad Yaar Mohammad Ustrani Ustrani 4 6 10 35 135 Noor Mohammad Malak Abdul Rahman Ustrani Ustrani 7 8 15 190 136 Din Mohammad Malak Abdul Rahman Ustrani Ustrani 4 6 10 190 137 Abdul Khaliq Malak Kala Khan Ustrani Ustrani 3 5 8 185 138 Abdul Malik Malak Kala Khan Ustrani Ustrani 3 2 5 175 139 Fatah Mohammad Malak Kala Khan Ustrani Ustrani 8 8 16 175 140 Shan Mohammad Dost Mohammad Ustrani Ustrani 2 5 7 225 141 Azim Jaan Khudaidad Ustrani Ustrani 4 4 8 60 142 Jamal Din Fazal Mohammad Ustrani Ustrani 3 2 5 310 143 Fakharudin Fazal Mohammad Ustrani Ustrani 3 5 8 305 144 Najmudin Fazal Mohammad Ustrani Ustrani 3 2 5 310 145 Nizamudin Fazal Mohammad Ustrani Ustrani 5 5 10 295 146 Dor Mohammad Abdullah Ustrani Ustrani 4 4 8 320 147 Wali Mohammad Mohammad Ali Ustrani Ustrani 2 2 4 325 148 Daad Mohammad Mohammad Ali Ustrani Ustrani 3 2 5 320 149 Khan Mohammad Bakhtyar Ustrani Ustrani 10 10 20 550 150 Faizullah Jaan Syed Khan Ustrani Ustrani 5 5 10 65 151 Baabo Jahan Ustrani Ustrani 3 3 6 50 152 Abdullah Jaan Soba Khan Ustrani Ustrani 4 4 8 450 153 Abdul Aziz Soba Khan Ustrani Ustrani 7 8 15 460 154 Abdul Azim Soba Khan Ustrani Ustrani 8 12 20 475 155 Gulzar Khan Rozi Khan Ustrani Ustrani 10 20 30 470 156 Wali Mohammad Wazeer Khan Ustrani Ustrani 9 9 18 65 157 Akhter Wazeer Khan Ustrani Ustrani 4 8 12 70 158 Nazer Mohammad Wazeer Khan Ustrani Ustrani 10 10 20 80 159 Sayedan Wazeer Khan Ustrani Ustrani 7 5 12 70 160 Mosa Khan Makhai Ustrani Ustrani 5 3 8 70 161 Mohammad Khan Shekao Khan Ustrani Ustrani 4 5 9 80 162 Sher Mohammad Lal Mohammad Ustrani Ustrani 4 4 8 220 163 Sher Khan Tajo Ustrani Ustrani 8 7 15 220 164 Kher Khan Sher Zaman Ustrani Ustrani 9 9 18 220 165 Shah Dozai Zareef Khan Ustrani Ustrani 12 18 30 0 166 Dur Mohammad Jan Mohammad Ustrani Ustrani 4 6 10 0 167 Jalenar Ali Mohammad Ustrani Ustrani 10 20 30 0 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-F [4/12] 168 Fazal Khan Yaqoob Ustrani Ustrani 8 12 20 50 169 Abdullah Jaan Mohammad Gul Ustrani Ustrani 7 9 16 160 170 Bem Gul Mohammad Gul Ustrani Ustrani 10 15 25 160 171 Jan Gul Mohammad Gul Ustrani Ustrani 7 8 15 160 172 Pai Gul Mohammad Gul Syed Syed 12 18 30 165 173 Abdullah Hussain Ustrani Ustrani 2 3 5 65 174 Juma Shah Hussain Ustrani Ustrani 1 4 5 65 175 Mohammad Akram GulBaran Ustrani Ustrani 1 2 3 65 176 Ghulam Hyder GulBaran Ustrani Ustrani 2 4 6 50 177 Shair Gul GulBaran Ustrani Ustrani 5 10 15 50 178 Ashraf Khan Sarfaraz Khan Ustrani Ustrani 1 2 3 50 179 Sarwar Jaan Sarfaraz Khan Ustrani Ustrani 4 4 8 50 180 Sarfaraz Khan Hussain Ustrani Ustrani 5 10 15 80 181 Sahab Khan Rozi Khan Ustrani Ustrani 1 1 2 85 182 Mohammad Ali Rozi Khan Ustrani Ustrani 2 3 5 80 183 Sultan Khan Rozi Khan Ustrani Ustrani 3 5 8 80 184 Qaisar Khan Rozi Khan Ustrani Ustrani 1 1 2 80 185 RoziKhan Narak Ustrani Ustrani 7 8 15 350 186 Peer Mohammad Raz Mohammad Ustrani Ustrani 5 5 10 530 187 Sher Mohammad Shakar Khan Ustrani Ustrani 2 6 8 50 188 Ramzam Shakar Khan Ustrani Ustrani 2 3 5 45 189 Jafar Jan Abdullah Jan Ustrani Ustrani 2 6 8 45 190 Mula Sahab Jan Abdullah Jan Ustrani Ustrani 2 2 4 40 191 Akber Khan Abdullah Jan Ustrani Ustrani 2 6 8 40 192 Hakeem Khan Wahab Khan Ustrani Ustrani 2 3 5 45 193 Jamal Khan Wahab Khan Ustrani Ustrani 2 4 6 45 194 Mir ullah Khan Wahab Khan Ustrani Ustrani 2 6 8 45 195 Nasrullah Wahab Khan Ustrani Ustrani 2 4 6 45 196 Diwa Khan Abdullah Khan Ustrani Ustrani 3 3 6 70 197 Gul Baran Juma Khan Ustrani Ustrani 3 4 7 70 198 Mohammad Sadiq Nazar Mohammad Ustrani Ustrani 6 4 10 190 199 Mohammad Raheem Nazar Mohammad Ustrani Ustrani 1 2 3 200 200 Mohammad Naeem Mohammad Khan Ustrani Ustrani 3 2 5 190 201 Mohammad Kareem Mohammad Khan Ustrani Ustrani 1 2 3 200 202 Khair Mohammad Sultan Mohammad Ustrani Ustrani 2 13 15 380 203 Mohammad Hussain Naiz Mohammad Ustrani Ustrani 2 3 5 380 204 Mohammad Qaseem Khair Mohammad Ustrani Ustrani 2 3 5 190 205 Mohammad Akrem Khair Mohammad Ustrani Ustrani 2 3 5 200 206 Mohammad Azam Khair Mohammad Ustrani Ustrani 2 4 6 200 207 Mohammad Alam Khair Mohammad Ustrani Ustrani 3 4 7 190 208 Mohammad Yousaf Khair Mohammad Ustrani Ustrani 1 2 3 170 209 Mola Jafer Mohammad Umer Ustrani Ustrani 8 2 10 95 210 Mohammad Usman Mohammad Umer Ustrani Ustrani 4 3 7 180 211 Qaim Khan Mohammad Umer Ustrani Ustrani 2 6 8 190 212 Noor Gul Syed Mohammad Ustrani Ustrani 3 4 7 90 213 Mohammad Aslam Syed Mohammad Ustrani Ustrani 4 5 9 110 214 Sheen Gul Syed Mohammad Ustrani Ustrani 2 3 5 85 215 Bang Syed Mohammad Ustrani Ustrani 3 4 7 190 216 Samandar Khan Mohammad Gul Ustrani Ustrani 5 5 10 490 217 Hashim Haji Nazir Ustrani Ustrani 3 6 9 500 218 Mohammad Khan Nazar Mohammad Syed Syed 4 6 10 240 219 Malik Amanullah M. HabibUllah Khan Tareen Raisani 6 7 13 130 220 Taheer Jan M. HabibUllah Khan Tareen Raisani 3 6 9 110 221 Akber Jan Sardar Khan Tareen Raisani 5 2 7 30 222 Noorullah Jan Haji Qadar Jan Tareen Raisani 5 4 9 60 223 Anwar Jan Sahab Jan Tareen Raisani 1 2 3 35 224 Sarwar Jan Dulat Khan Tareen Raisani 3 5 8 35 225 Nasrullah Jan Sanzar Khan Tareen Raisani 3 2 5 50 226 Samad Jan Sanzar Khan Tareen Raisani 4 6 10 50 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-F [5/12] 227 Meera Jan Dulat Khan Tareen Raisani 2 1 3 30 228 Raza Khan Safar Khan Tareen Raisani 5 4 9 50 229 Aalam Jan Safar Khan Tareen Raisani 3 2 5 50 230 Agha Jan Madad Khan Tareen Raisani 7 3 10 100 231 Mohammad Waseel Agha Jan Tareen Raisani 1 1 2 70 232 Hassan Khan Jaan Khan Tareen Raisani 1 1 2 70 233 Alam Khan Hassan Khan Tareen Raisani 2 3 5 60 234 Mehrullah Khan Hassan Khan Tareen Raisani 1 2 3 70 235 Nazar Khan Hassan Khan Tareen Raisani 3 1 4 60 236 Qasam Khan Karam Khan Tareen Raisani 3 1 4 120 237 Nadir Khan Azad Khan Tareen Raisani 6 4 10 65 238 Jalal Khan Azad Khan Tareen Raisani 1 2 3 55 239 Bakhtyar Khan Azad Khan Tareen Raisani 2 1 3 65 240 Gul Khan Baloch Khan Tareen Raisani 3 7 10 55 241 Ahmed Khan Baloch Khan Tareen Raisani 5 5 10 60 242 Abdullah Khan Baloch Khan Tareen Raisani 2 1 3 60 243 Sheer Jan Qutab Khan Tareen Raisani 1 3 4 30 244 Faizu Khan Hussain Khan Tareen Raisani 6 4 10 50 245 Umeed Khan Hussain Khan Tareen Raisani 3 2 5 60 246 Kamil Khan Hussain Khan Tareen Raisani 1 3 4 60 247 Niamatullah Khan Hussain Khan Tareen Raisani 1 1 2 60 248 Lal Jan Sawar Jan Tareen Raisani 2 2 4 25 249 Wazeer Khan Ramzan Tareen Raisani 11 1 12 30 250 Tamar Khan Ramzan Tareen Raisani 1 1 2 30 251 Haji Dur Mohammad Shair Mohammad Tareen Raisani 4 3 7 60 252 Saifullah Khan Zareef Khan Tareen Raisani 1 3 4 30 253 Zareef Khan Saeed Khan Tareen Raisani 7 8 15 60 254 A.Wahib Khan Jamal Khan Tareen Raisani 3 4 7 20 255 Abdul Wassy Jamal Khan Tareen Raisani 1 2 3 20 256 A. Qayoom A. Ghafoor Tareen Raisani 2 5 7 20 257 Lal Jan Haji A. Khaliq Tareen Raisani 3 3 6 50 258 Abdul Khaliq Abdul Latif Tareen Raisani 9 7 16 70 259 Haybat Mir Ahmed Tareen Raisani 2 4 6 50 260 Temor Shah Mohammad Naeem Tareen Raisani 3 2 5 20 261 Niaz Mohammad Baz Mohammad Tareen Raisani 7 6 13 25 262 Fardal Raman Tareen Raisani 2 2 4 15 263 AbdulManan Faizullah Jan Tareen Raisani 7 4 11 15 264 Abdul Saleem Abdul Hakeem Tareen Raisani 5 5 10 20 265 Abdul Raof Abdul Aziz Tareen Raisani 3 4 7 20 266 Abdul Hakeem Abdul Aziz Tareen Raisani 1 3 4 30 267 Mohammad Sadiq Abdul Latif Tareen Raisani 7 7 14 27 268 Mohammad Nawaz Akhter Khan Tareen Raisani 5 7 12 25 269 Baz Mohammad Din Mohammad Tareen Raisani 3 4 7 30 270 Kala Jan Kutab Khan Tareen Raisani 1 2 3 40 271 Shair Zaman Haji Allah Dad Tareen Raisani 8 4 12 40 272 Neak Mohammad Din Mohammad Tareen Raisani 2 3 5 38 273 Qalandar Khan Taj Mohammad Tareen Raisani 3 5 8 40 274 Saleh Mohammad Faiz Mohammad Tareen Raisani 4 3 7 35 275 Gulzar Khan Abdullah Tareen 1 3 4 35 276 Mohammad Sadiq Wali Mohammad Tareen Raisani 3 2 5 35 277 Faqerullah Niaz Mohammad Tareen Raisani 6 4 10 250 278 Ahmed Mohammad Tareen Raisani 8 5 13 30 279 Zarif Khan Jala Khan Tareen Raisani 5 3 8 10 280 Dawood Khan Amanullah Tareen Raisani 1 4 5 135 281 Haq Nawaz Khan Ghani Khan Tareen Raisani 2 2 4 38 282 Jameel-u-Rehman Ghulam Jan Tareen Raisani 3 2 5 40 283 Abdul Rehman Baran Tareen Raisani 2 4 6 40 284 Ahasanullah Saadullah Tareen Raisani 2 4 6 29 285 Abdul Hay Abdullah Jan Tareen Raisani 2 3 5 29 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-F [6/12] 286 Mirgul Sharbat Khan Tareen Raisani 4 2 6 20 287 Dingul Sharbat Khan Tareen Raisani 1 1 2 20 288 Chargul Sharbat Khan Tareen Raisani 6 4 10 30 289 Ashraf Khan Akhter Khan Tareen Raisani 3 4 7 25 290 Abdul Ghafar Kamal Khan Tareen Raisani 5 2 7 31 291 Abdul Jafar Kamal Khan Tareen Raisani 1 2 3 31 292 Mohammad Sharif Mohammad Sadiq Tareen Raisani 3 2 5 27 293 Sadat Khan Baz Khan Tareen Raisani 2 2 4 20 294 Gulzar Khan Baz Khan Tareen Raisani 4 2 6 20 295 Dilawar Khan Haji Asad Khan Tareen Raisani 4 9 13 35 296 Mohammad Kasim Soba Khan Tareen Raisani 2 4 6 15 297 Abdul Hanan Miram Tareen Raisani 4 4 8 15 298 Abdul Hameed Khan Haji Sydaan Khan Tareen Raisani 13 11 24 220 299 Khair Mohammad Dost Mohammad Tareen Raisani 8 12 20 360 300 Malik Jan Akal Mohammad Tareen Raisani 6 6 12 80 301 Akhter Mohammad Faiz Mohammad Tareen Raisani 8 12 20 100 302 Murad Mohammad Dost Mohammad Tareen Raisani 5 6 11 220 303 Shareen Khan Haji Gul Mohammad Tareen Raisani 12 18 30 260 Mula Rokai 304 Inayatullah Sufi Khan Tareen Raisani 5 5 10 50 305 Khan Gul Aka Almar Tareen Raisani 2 4 6 0 306 Khan Aka Salay Mohammad Tareen Raisani 15 10 25 45 307 Noor Khan Raheem Khan Tareen Raisani 2 3 5 0 308 Akhbar Salay Mohammad Tareen Raisani 15 10 25 40 309 Mashak Mama Faiz Mohammad Tareen Raisani 10 15 25 65 310 Haji Wali Mohammad Haji Yar Mohammad Tareen Raisani 20 35 55 195 311 Abdul Jan Saeed Ahmed Tareen Raisani 15 15 30 45 312 Lala Jan Faiz Mohammad Tareen Raisani 10 15 25 75 313 Malik Mohammad Faiz Mohammad Tareen Raisani 8 7 15 120 314 Ali Mohammad Salay Mohammad Tareen Raisani 7 9 16 35 315 Baz Mohammad Yar Mohammad Tareen Raisani 10 15 25 50 316 Agha Mohammad Haji Naik Mohammad Tareen Raisani 8 7 15 160 317 Sorab Khan Haji Naik Mohammad Tareen Raisani 7 7 14 160 318 Gulzar Khan Haji Naik Mohammad Tareen Raisani 5 6 11 160 319 Ali Khan Mozak Khan Tareen Raisani 6 5 11 63 320 Suba Khan Mozak Khan Tareen Raisani 6 8 14 58 321 Nadir Khan Mozak Khan Tareen Raisani 4 4 8 63 322 Behraam Khan Mozak Khan Tareen Raisani 4 3 7 63 323 Mohammad Waseel Pastalab Tareen Raisani 10 8 18 42 324 Musa Jan Arslan Khan Tareen Raisani 7 3 10 40 325 Hassan Jan Arslan Khan Tareen Raisani 1 3 4 38 326 Saifullah Jan Arslan Khan Tareen Raisani 1 1 2 34 327 Merra Jan Arslan Khan Tareen Raisani 1 1 2 34 328 Musa Khan Gul Khan Tareen Raisani 4 2 6 20 329 Masoom Khan Gul Khan Tareen Raisani 2 7 9 20 330 Niayal Khan Gul Khan Tareen Raisani 4 2 6 20 331 Tahir Jan Hassan Jan Tareen Raisani 5 7 12 20 332 Abdullah Jan Mohammad Jan Tareen Raisani 8 6 14 26 333 Kala Jan Mohammad Jan Tareen Raisani 4 3 7 13 334 Qadir Jan Mohammad Jan Tareen Raisani 9 5 14 13 335 Musa Jan Mohammad Jan Tareen Raisani 3 5 8 13 336 Saadullah Haji Juma Tareen Raisani 3 4 7 75 337 Mohammad Akhber Jalat Khan Tareen Raisani 6 3 9 20 338 Abdul Rehman Mohammad Gul Tareen Raisani 8 6 14 34 339 Abdullah Jan Mohammad Gul Tareen Raisani 6 4 10 34 Sardar Faqeer 340 Sardar Rafeeq Mohammad Tareen Raisani 2 4 6 340 341 Bismillah Jan Mohammad Gul Tareen Raisani 5 4 9 32 342 Khan Gul Aka Mohammad Gul Tareen Raisani 3 7 10 32 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-F [7/12] 343 Khan Zaman Mohammad Gul Tareen Raisani 1 1 2 22 344 Sarda Shafeeq Khan Sardar Faqeer Khan Tareen Raisani 2 3 5 670 Sardar Ameer 345 Sardar Anwar Jan Mohammad Tareen Raisani 5 4 9 450 Sardar Faqeer 346 Sardar Farooq Khan Mohammad Tareen Raisani 2 2 4 400 347 Sardar Ahmed Jan Sardar Ameer Jan Tareen Raisani 2 3 5 350 348 Sardar Qadir Jan Sardar Ameer Jan Tareen Raisani 2 4 6 400 349 Jamal Khan Haji Naik Mohammad Tareen Raisani 5 7 12 260 350 Haji Taj Mohammad Haji Yar Mohammad Tareen Raisani 60 100 160 580 351 Rostan Khan H. Wali Mohammad Tareen Raisani 5 5 10 320 352 Azeem Jan Allah Dad Khan Tareen Raisani 4 6 10 40 Sardar Meer Alam 353 Khan Sardar Ameer Jan Tareen Raisani 4 3 7 350 Sardar Fazal Sardar 354 Mohammad KhanMohammad Tareen Raisani 3 5 8 450 355 Haji Dur Mohammad Haji Abdullah Tareen Raisani 6 3 9 52 356 Ali Mohammad Haji Abdullah Tareen Raisani 6 5 11 72 357 Mohammad Aalam Haji Abdullah Tareen Raisani 4 8 12 77 358 Shaik Mohammad Haji Abdullah Tareen Raisani 7 3 10 72 359 Babo Khan Faizullah Khan Tareen Raisani 4 6 10 72 360 Dadu Khan Faizullah Khan Tareen Raisani 4 7 11 70 361 Dad Mohammad Faizullah Khan Tareen Raisani 5 7 12 80 362 Mohammad Afzal Haji Aazizullah Tareen Raisani 5 3 8 90 363 Mohammad Saeed Haji Aazizullah Tareen Raisani 4 8 12 90 364 Mohammad Ashraf Haji Aazizullah Tareen Raisani 3 4 7 100 365 Mohammad Anwar Haji Aazizullah Tareen Raisani 1 2 3 90 366 Mohammad Sadiq Haji Aazizullah Tareen Raisani 2 4 6 100 367 Fareed Khan Haji Aazizullah Tareen Raisani 1 1 2 80 368 Mohammad Usman Haji Zaitullah Jan Tareen Raisani 1 4 5 100 369 Mohammad Haneef Haji Zaitullah Jan Tareen Raisani 4 3 7 100 370 Mohammad Shafeeq Haji Zaitullah Jan Tareen Raisani 2 3 5 110 371 Mohammad Sadeeq Haji Zaitullah Jan Tareen Raisani 2 1 3 110 372 Lal Muahammad Janu Khan Tareen Raisani 6 4 10 30 373 Behraam Khan Janu Khan Tareen Raisani 5 3 8 30 374 Shair Khan Janu Khan Tareen Raisani 5 5 10 30 375 Baram Khan Zahir Khan Tareen Barmani 2 6 8 32 376 Haji Ayoob Khan Zahir Khan Tareen Barmani 3 4 7 32 377 Masoom Khan Zahir Khan Tareen Barmani 2 3 5 32 378 Aqal Khan Zahir Khan Tareen Barmani 2 4 6 32 379 Jafar Khan Zahir Khan Tareen Barmani 4 4 8 32 380 Haji Razo Zahir Khan Tareen Barmani 6 10 16 32 381 Mohammad Ayob Haji Shahbaz Shah Tareen Khadani 4 2 6 25 382 Mirza Khan Haji Shahbaz Khan Tareen Khadani 2 5 7 42 383 Mohammad Hashim Haji Shahbaz Khan Tareen Khadani 3 3 6 31 384 Ghulam Dastagir Haji Shahbaz Khan Tareen Khadani 4 6 10 18 385 Abdul Khaliq Shair Mohammad Tareen Khadani 1 4 5 0 386 Ali Jan Pir Mohammad Tareen Khadani 5 3 8 40 387 Wali Jan Pir Mohammad Tareen Khadani 9 7 16 42 388 Ali Khan Nazar Mohammad Tareen Khadani 7 8 15 30 389 Haji Ghulam Niaz Mohammad Tareen Khadani 9 6 15 15 390 Faqer Jan Abdullah Jan Tareen Khadani 5 4 9 22 391 Noor Ahmed Shah Abraheem Shah Sayed Syed 8 9 17 0 392 Sadiq Shah Mohammad Shah Sayed Syed 12 13 25 35 393 Hameed Shah Mohammad Shah Sayed Syed 11 7 18 25 394 Saeed Mohammad Matoo Khan Tareen Khadani 3 4 7 40 395 Baram Shah Tawab Shah Sayed Syed 6 4 10 0 396 Toyeeb Shah Tawab Shah Sayed Syed 4 3 7 0 397 Kamal Shah Gharib Shah Sayed Syed 4 2 6 25 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-F [8/12] 398 Aamir Shah Gharib Shah Sayed Syed 5 3 8 15 399 Haji Majeed Shah Gharib Shah Sayed Syed 6 5 11 0 400 Faqir Shah Gharib Shah Sayed Syed 4 2 6 0 401 Yaseen Shah Afzal Shah Sayed Syed 4 5 9 0 402 Bismillah Jan Allah Dad Khan Tareen Barmani 1 2 3 0 Haji Noor 403 Mohammad Haji Taj Mohammad Tareen Raisani 15 20 35 220 404 Haji Gul Mir Zafran Khan Ustrani Ustrani 8 12 20 480 405 Malik Laat Malik Jhangir Ustrani Ustrani 8 12 20 470 Moli Khan 406 Mohammad Mohammad Khan Ustrani Ustrani 4 6 10 390 407 Jan Mohammad Mohammad Khan Ustrani Ustrani 3 5 8 360 408 Saiban Toor Khan Ustrani Ustrani 7 8 15 350 409 Baz Mohammad Khair Mohammad Ustrani Ustrani 7 8 15 440 410 Dost Mohammad Yar Mohammad Ustrani Ustrani 6 6 12 250 411 Sharbat Khan Gode Ustrani Ustrani 5 5 10 240 412 Jan Mohammad Dil Jan Ustrani Ustrani 8 7 15 80 413 Hassan Shadi Khan Ustrani Ustrani 8 12 20 20 414 Rehman Sultan Ustrani Ustrani 2 5 7 250 415 Niaz Mohammad Saeed Khan Ustrani Ustrani 8 7 15 250 416 Dad Mohammad Roz Mohammad Ustrani Ustrani 5 5 10 70 417 Noor Mohammad Roz Mohammad Ustrani Ustrani 9 6 15 70 418 Kamal Noor Khan Ustrani Ustrani 4 11 15 350 419 Shareef Noor Khan Ustrani Ustrani 7 5 12 10 420 Nusan Bari Ustrani Ustrani 2 6 8 360 421 Azeem Malay Ustrani Ustrani 5 5 10 250 422 Khair Mohammad Malay Ustrani Ustrani 2 6 8 240 423 Bakhyar Khan Malay Ustrani Ustrani 2 9 11 230 424 Lalak Jan Dinak Jan Ustrani Ustrani 8 2 10 10 425 Musa Khan Lashkar Khan Sayed Syed 0 0 Non resident 110 426 Jafar Khan Sorab Khan Ustrani Ustrani 0 0 Non resident 100 427 Raheem Sher Jan Ustrani Ustrani 0 0 Non resident 90 428 Sahib Jan Kotay Khan Ustrani Ustrani 0 0 Non resident 110 429 Shah Baz Khan Din Mohammad Ustrani Ustrani 0 0 Non resident 70 430 Abdullah Jan Amir Mohammad Ustrani Ustrani 0 0 Non resident 50 431 Sarwar Baram Khan Ustrani Ustrani 7 8 15 30 432 Taweez Khan Abdul Rehman Baloch Buzdar 6 9 15 30 433 Qaisar Khan Torak Khan Baloch Buzdar 7 8 15 60 434 Sharbat Khan Abdul Rehman Baloch Buzdar 1 3 4 30 435 Jafae Khan Abdul Rehman Baloch Buzdar 2 4 6 30 436 Azad Khan Abdul Rehman Baloch Buzdar 2 5 7 30 437 Nasrullah Khan Abdul Rehman Baloch Buzdar 3 4 7 30 438 Jalat Khan Khan Zaman Baloch Buzdar 2 3 5 0 Mohammad Shah 439 Khan Mohammad Zaman Baloch Buzdar 2 1 3 0 440 Kamal Khan Mohammad Zaman Baloch Buzdar 2 1 3 0 441 Ghazi Khan Mohammad Zaman Baloch Buzdar 1 4 5 0 442 Shaista Khan Sher Zaman Baloch Buzdar 4 6 10 0 443 Dunya Khan Kabeer Baloch Buzdar 6 4 10 40 444 Juma Khan Kabeer Baloch Buzdar 3 7 10 60 445 Abdullah Khan Haji Khan Baloch Buzdar 7 3 10 30 446 Mehrab Khan Mehrullah Khan Tareen Musyani 22 18 40 380 447 Mohammad Khan Niaz Mohammad Tareen Musyani 5 7 12 80 448 Momen Khan Noor Mohammad Tareen Musyani 10 6 16 90 449 Saifullah Jan Ahmed Aan Tareen Musyani 14 4 18 40 450 Bismillah Jan Sahib Jan Tareen Musyani 8 6 14 40 451 Mumadaan Abdul Qadir Tareen Musyani 2 4 6 40 452 Khaliq Dad Haji Ibraheem Tareen Musyani 11 9 20 90 453 Haji Abdul Wahaab Haji Allah Dad Tareen Musyani 6 9 15 80 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-F [9/12] 454 Shahbaz Khan Gul Mohammad Tareen Musyani 3 5 8 30 455 Musa Jan Haji Adullah Jan Tareen Musyani 15 10 25 100 456 Samandar Khan Noroz Khan Tareen Musyani 7 3 10 30 457 Faiz Mohammad Khan Mohammad Tareen Musyani 23 17 40 60 458 Khair Mohammad Mohammad Husain Tareen Musyani 6 9 15 60 459 Juma Khan Jalal Khan Tareen Raisani 9 11 20 45 460 Qalandar Khan Lajwar Tareen Raisani 8 12 20 40 461 Haji Abdullah Khan Lajwar Tareen Raisani 5 5 10 40 462 Abdul Khaliq Kamal Khan Tareen Raisani 7 3 10 80 463 Abdul Sattar Noor Khan Tareen Raisani 6 2 8 35 464 Mohammad Sadiq Abdul Latif Tareen Raisani 14 16 30 60 465 Mohammad Raheem Abdul Kareem Tareen Raisani 23 37 60 240 466 Aadam Khan Akhter Mohammad Tareen Raisani 15 20 35 65 467 Karam Khan Abdul Hakeem Tareen Raisani 7 11 18 100 468 Mohammad Umar Taj Maden Tareen Musyani 5 6 11 32 469 Fazal Mohammad Sultan Mohammad Tareen Musyani 6 8 14 54 470 Murad Mohammad Sultan Mohammad Tareen Musyani 5 3 8 44 471 Dur Mohammad Sultan Mohammad Tareen Musyani 7 5 12 115 472 Taj Mohammad Sultan Mohammad Tareen Musyani 5 4 9 115 473 Sardar Khan Madad Khan Tareen Raisani 7 6 13 75 474 Hakeem Khan Madad Khan Tareen Raisani 5 3 8 50 475 Kala Khan Kamal Khan Tareen Raisani 9 12 21 110 476 Juma Khan Baara Khan Tareen Raisani 12 8 20 110 477 Niazmudin Karam Khan Tareen Raisani 4 6 10 50 478 Nasrudin Karam Khan Tareen Raisani 3 3 6 50 479 Fakhrudin Karam Khan Tareen Raisani 3 4 7 50 480 Mohammad Ayuob Nasrullah Khan Tareen Raisani 5 4 9 50 481 Mohammad Hasham Nasrullah Khan Tareen Raisani 5 2 7 50 482 Jamal Khan Noor Mohammad Tareen Raisani 3 2 5 27 483 Habibullah Noor Mohammad Tareen Raisani 2 1 3 27 484 Ghazi Khan Noor Mohammad Tareen Raisani 6 3 9 27 485 Gulzar Khan Noor Mohammad Tareen Raisani 7 3 10 27 486 Amanullah Noor Mohammad Tareen Raisani 3 6 9 27 487 Nazir Ahamad Noor Ahamad Kakar Shadozai 4 5 9 120 488 Naheem Ahamad Noor Ahamad Kakar Shadozai 3 4 7 120 489 Ghafar Noor Ahamad Kakar Shadozai 2 4 6 115 490 Khan Zaman Noor Ahamad Kakar Shadozai 2 3 5 110 491 Ghafoor Mohammad Noor Ahamad Kakar Shadozai 5 3 8 120 492 Manzoor Ahamad Noor Ahamad Kakar Shadozai 4 5 9 120 493 Malik Qasim Abdul Jabar Kakar Shadozai 5 6 11 276 494 Naseeb Ahamad Abdul Jabar Kakar Shadozai 3 4 7 270 495 Safar Mohammad Abdul Jabar Kakar Shadozai 3 3 6 270 496 Molvi A. Ghafoor Abdul Jabar Kakar Shadozai 5 7 12 275 497 Shuhabdin Abdul Jabar Kakar Shadozai 2 4 6 270 498 Malik Hasham Abdul Jabar Kakar Shadozai 2 3 5 270 499 Amir Hamza Haji Baz Mohammad Kakar Shadozai 4 5 9 120 500 Nora Khan Haji Baz Mohammad Kakar Shadozai 3 4 7 125 501 Soba Khan Haji Baz Mohammad Kakar Shadozai 3 5 8 120 502 Akbar Khan Haji Baz Mohammad Kakar Shadozai 2 4 6 100 503 Smahil Khan Dad Khan Kakar Shadozai 3 4 7 170 504 Gohar Khan Dad Khan Kakar Shadozai 3 2 5 160 505 Sarfaraz Khan Dad Khan Kakar Shadozai 3 3 6 160 506 Dur Mohammad Haji Rozak Kakar Shadozai 3 4 7 220 507 H.Bahram Khan Haji Rozak Kakar Shadozai 3 5 8 220 508 Shadi Khan Murad Khan Kakar Shadozai 4 5 9 40 509 Molvi M. Khan Murad Khan Kakar Shadozai 5 6 11 60 510 Haji Meta Khan Murad Khan Kakar Shadozai 2 4 6 60 511 Ibrahim Khan Murad Khan Kakar Shadozai 3 4 7 20 512 Madad Khan Sarbuland Khan Kakar Shadozai 4 4 8 270 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-F [10/12] 513 Husain Khan Sarbuland Khan Kakar Shadozai 3 4 7 270 514 Shadi Khan Sarbuland Khan Kakar Shadozai 5 5 10 270 515 Baloch Khan Sarbuland Khan Kakar Shadozai 4 4 8 270 516 H.saleh Dost Mohammad Kakar Shadozai 3 3 6 130 517 Jan Mohammad Akhttar Mohammad Kakar Shadozai 3 3 6 120 518 Aourang Khan Masoom Khan Kakar Shadozai 4 4 8 40 519 Jawar Khan Wasib Khan Kakar Shadozai 3 3 6 40 520 Falak Niaz Shah Mohammad Kakar Shadozai 5 6 11 70 521 Mohammad Wali Bahdur Khan Kakar Shadozai 4 5 9 90 522 Mohammad Ameen Rozi Khan Kakar Shadozai 3 5 8 35 523 Bakht Mohammad Rozi Khan Kakar Shadozai 3 3 6 35 524 Taj Mohammad Rozi Khan Kakar Shadozai 3 5 8 25 525 Faiz Mohammad Rozi Khan Kakar Shadozai 2 5 7 15 526 Abid Khan Rozi Khan Kakar Shadozai 3 3 6 15 527 Nawab Khan Dad Mohammad Kakar Shadozai 2 3 5 15 528 Fazal Mohammad Jan Mohammad Kakar Shadozai 3 4 7 170 529 Abdul Qadir Ameer Kakar Shadozai 3 5 8 50 530 Murtaza Ameer Kakar Shadozai 6 6 12 50 531 Pir Mohammad Gul Baran Kakar Shadozai 3 5 8 80 532 Faizullah Jaan Gul Baran Kakar Shadozai 3 2 5 70 533 Ajmir M. Saleh Kakar Shadozai 5 5 10 10 534 A. Rasheed fazal Shah Kakar Shadozai 4 3 7 10 535 M. Noor Shah M. Shah Kakar Shadozai 4 2 6 10 536 Qalandar Khan Mir Khan Kakar Shadozai 2 2 4 60 537 jalandar Mir Khan Kakar Shadozai 3 4 7 60 538 Samandar Mir Khan Kakar Shadozai 6 4 10 140 539 Sakandar Mir Khan Kakar Shadozai 1 2 3 40 540 sakhi Mohammad Khair Mohammad Kakar Shadozai 4 5 9 90 541 Azar Khan Khair Mohammad Kakar Shadozai 2 4 6 80 542 Gul Mohammad Khair Mohammad Kakar Shadozai 2 4 6 120 543 Dur Mohammad Khair Mohammad Kakar Shadozai 3 6 9 130 544 Saeed Mohammad Khair Mohammad Kakar Shadozai 4 7 11 130 545 Yar Mohammad Khan Mohammad Kakar Shadozai 4 5 9 140 546 Ali Mohammad Khan Mohammad Kakar Shadozai 2 6 8 120 547 Mirza Khan Abdullah Jan Kakar Shadozai 6 3 9 70 548 Bismillah Jan Mia Alam Kakar Shadozai 4 2 6 70 549 Shah Mir Ahamad Jan Kakar Shadozai 4 3 7 70 550 Atta Mohammad Lal Mohammad Kakar Shadozai 4 5 9 70 551 Mohammad Shah Jumma Shah Kakar Shadozai 6 5 11 10 552 Sultan shah Jumma Shah Kakar Shadozai 2 3 5 10 553 Mureed Shah Jumma Shah Kakar Shadozai 3 2 5 10 554 Afzal Shah Jumma Shah Kakar Shadozai 1 3 4 10 555 Abdul Razaq Haji Mir Kakar Shadozai 6 6 12 70 556 Lal Shah Ahamad Shah Kakar Shadozai 4 4 8 7 557 Aqal Shah Ahamad Shah Kakar Shadozai 4 3 7 7 558 Nazar Shah Ahamad Shah Kakar Shadozai 2 2 4 5 559 Mohammad Tahir Gul Baran Kakar Shadozai 4 6 10 90 560 Mohammad umar Gul Baran Kakar Shadozai 4 5 9 80 561 Jan Nasrullah Khan Kakar Shadozai 3 3 6 70 562 Mohammad Ayoub Nasrullah Khan Kakar Shadozai 3 4 7 30 563 Bangul Khan Nasrullah Khan Kakar Shadozai 6 7 13 40 564 khairullah Nasrullah Khan Kakar Shadozai 3 5 8 60 565 Ghulam nabi Habib Ullah Kakar Shadozai 3 6 9 70 566 Amanullah Habib Ullah Kakar Shadozai 3 3 6 70 567 sanzar Khan Habib Ullah Kakar Shadozai 3 4 7 60 568 Saboor Jan Habib Ullah Kakar Shadozai 5 5 10 170 569 Sakhi Jan Abdullah Jan Kakar Shadozai 3 4 7 170 570 Paind Khan Haji Gulzar Kakar Shadozai 3 6 9 80 571 Sorat Khan Haji Gulzar Kakar Shadozai 3 3 6 90 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-F [11/12] 572 Karam Khan Haji Gulzar Kakar Shadozai 4 4 8 70 573 Dunya Khan Haji Gulzar Kakar Shadozai 6 6 12 90 574 Hazar Khan Haji Qaim Khan Kakar Shadozai 6 5 11 90 575 Qaisar Khan Haji Qaim Khan Kakar Shadozai 3 6 9 90 576 Bakhtiar Kkan Haji Qaim Khan Kakar Shadozai 3 3 6 80 577 Rayaz Khan Haji Qaim Khan Kakar Shadozai 4 3 7 74 578 Zainullah Haji Karam Kakar Shadozai 5 5 10 80 579 Saifudin Haji Karam Kakar Shadozai 3 3 6 90 580 Mohammad umar Mohammad Tahir Kakar Shadozai 5 6 11 90 581 Faizullah Khan Mohammad Tahir Kakar Shadozai 3 3 6 80 582 Pir Mohammad Mohammad Tahir Kakar Shadozai 3 6 9 86 583 Shamsullah Jan Kaka Kakar Shadozai 3 3 6 70 584 naseeb ullah Jan Kaka Kakar Shadozai 6 5 11 90 585 jamal Khan Sher Zaman Kakar Shadozai 3 3 6 70 586 Juma Khan Sher Zaman Kakar Shadozai 6 7 13 80 587 Asmatullah Sher Zaman Kakar Shadozai 4 3 7 80 588 M. Abdul razaq Amanullah Kakar Shadozai 6 5 11 90 589 Saeed ullah Amanullah Kakar Shadozai 3 3 6 70 590 Ghulam Husain Amanullah Kakar Shadozai 5 5 10 50 591 Ghulam rasool Amanullah Kakar Shadozai 2 4 6 60 592 Ghulam Mustafa Amanullah Kakar Shadozai 5 6 11 60 593 Ghulam farooq Amanullah Kakar Shadozai 3 4 7 80 594 Mohammad Usman Qalandar Kakar Shadozai 5 7 12 80 595 Mohammad Hasan Qalandar Kakar Shadozai 3 6 9 70 596 Mohammad Aleem Qalandar Kakar Shadozai 3 3 6 60 597 Mohammad Sadiq Qalandar Kakar Shadozai 6 5 11 80 598 Mohammad Aslam Qalandar Kakar Shadozai 3 4 7 80 599 Zafarullah Samandar Khan Kakar Shadozai 6 7 13 90 600 Abdul malik Samandar Khan Kakar Shadozai 3 4 7 80 601 Abdul Wahid Samandar Khan Kakar Shadozai 7 7 14 80 602 Abdul Khaliq Samandar Khan Kakar Shadozai 4 4 8 70 603 Abdul Aziz Samandar Khan Kakar Shadozai 7 5 12 70 604 Yar Mohammad Khan Mohammad Kakar Shadozai 3 4 7 70 605 Ali Mohammad Khan Mohammad Kakar Shadozai 6 4 10 100 606 Niaz Mohammad Bakhtiar Khan Ustrani Ustrani 9 7 16 90 607 Khan mir Gul Mir Ustrani Ustrani 4 5 9 140 608 Sharbat Khan Gode Ustrani Ustrani 3 4 7 60 609 Sher Zaman Kharh Ustrani Ustrani 2 4 6 50 610 Fazal Khan Mirza Khan Ustrani Ustrani 1 3 4 50 611 Saif ullah Mir Dad Ustrani Ustrani 3 6 9 40 612 Neik Mohammad Yar Mohammad Ustrani Ustrani 4 6 10 20 613 Dost Mohammad Yar Mohammad Ustrani Ustrani 2 4 6 20 614 Janan Safar Khan Ustrani Ustrani 5 7 12 40 615 Tor Jan Jalat Khan Ustrani Ustrani 9 7 16 30 616 Husain Khan Jumma Khan Ustrani Ustrani 3 2 5 30 617 Mazar Khan Mohammad Khan Ustrani Ustrani 6 7 13 50 618 Habib Khan Mohammad Khan Ustrani Ustrani 1 3 4 30 619 Baz Mohammad Khudaidad Ustrani Ustrani 6 4 10 50 620 Jan Mohammad Mahmood Khan Ustrani Ustrani 4 3 7 30 621 Khan Mohammad Mahmood Khan Ustrani Ustrani 6 3 9 60 622 Noor Mohammad Raz Mohammad Ustrani Ustrani 6 5 11 120 623 Laaj Mir Nazeer Khan Ustrani Ustrani 2 3 5 240 624 Baz Mir Jangeer Ustrani Ustrani 6 4 10 90 625 Sher Mohammad Jahangeer Ustrani Ustrani 2 4 6 140 626 Shah Mir Gul Mir Ustrani Ustrani 3 4 7 80 627 Baloch Khan Gul Mir Ustrani Ustrani 5 4 9 80 628 Husain Khan Gul Mir Ustrani Ustrani 4 4 8 80 629 Haji Gul Mir Zareef Khan Ustrani Ustrani 5 6 11 255 630 Kamal Khan Noor Khan Ustrani Ustrani 2 3 5 70 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-F [12/12] 631 Hasan Khan Bari Khan Ustrani Ustrani 3 3 6 60 632 Bakhtiar Khan Haji Maley Ustrani Ustrani 3 6 9 40 633 Haji Bazak Rozak Ustrani Ustrani 2 6 8 60 634 Rozi Khan Mir Dad Ustrani Ustrani 1 3 4 50 635 Qayoum Khan Jan Khan Ustrani Ustrani 2 5 7 30 636 Naseeb Khan Jan Khan Ustrani Ustrani 5 4 9 40 637 Farooq Khan Jan Khan Ustrani Ustrani 5 6 11 30 638 Umeed Khan Jan Khan Ustrani Ustrani 3 2 5 40 639 Abdullah Jan Soba Khan Ustrani Ustrani 2 2 4 50 640 A. Aziz Soba Khan Ustrani Ustrani 2 4 6 40 641 A. Azeem Soba Khan Ustrani Ustrani 5 4 9 40 642 Haji Khani Bakhtiar Khan Ustrani Ustrani 4 1 5 80 643 Mohammad Hasan Zareef Khan Loni Palaw 9 7 16 120 644 Mohammad Husain Zareef Khan Loni Palaw 7 7 14 240 645 Syed hasan Zareef Khan Loni Palaw 5 4 9 140 Mohammad Hassan 646 Khan Mian Khan Loni Palaw 14 16 30 220 647 jamal Khan Mian Khan Loni Palaw 10 9 19 110 648 Haji Paind Khan H. Gul Baran Loni Palaw 6 3 9 240 649 Haji Khani H. Gul Baran Loni Palaw 7 10 17 140 650 Haji Gul Zar H. Gul Baran Loni Palaw 6 5 11 240 651 Haji Ghazi H. Gul Baran Loni Palaw 5 5 10 240 652 Haji Farooq H. Gul Baran Loni Palaw 3 5 8 245 653 Sarbuland Khan H. Gul Baran Loni Palaw 5 4 9 240 654 Haji Mastar H. Faizullah Loni Palaw 7 5 12 140 655 Haji Qalandar H. Faizullah Loni Palaw 4 5 9 90 656 Madad Khan Nasrullah Khan Loni Palaw 7 7 14 155 Haji Akhtar 657 Haji Abdullah Mohammad Loni Palaw 6 7 13 250 658 Ameer Mohammad Wali Mohammad Loni Palaw 3 5 8 140 659 Shamsullah Nazar Mohammad Loni Palaw 2 4 6 40 660 Jan Mohammad Wali Mohammad Loni Palaw 4 7 11 40 661 Mohammad Wali Mohammad Loni Palaw 6 3 9 30 662 H.A. Kareem H. Jalaludin Loni Palaw 4 6 10 70 663 Ferooz Khan H. Jalaludin Loni Palaw 3 4 7 70 664 Saleem Khan Godey Khan Loni Palaw 2 3 5 80 665 Taj Mohammad A. Ghani Loni Palaw 3 6 9 70 666 Baz Mohammad A. Ghani Loni Palaw 6 5 11 70 667 Zahir Khan Mir Dad Loni Palaw 3 2 5 60 668 Paind Khan Jamali Loni Palaw 5 8 13 30 669 Niaz Mohammad Saeed Mohammad Loni Palaw 7 9 16 40 670 Amir Mohammad Jan Mohammad Loni Palaw 4 3 7 10 671 A. Rehman Sultan Mohammad Loni Palaw 6 5 11 50 672 Faiz Mohammad Roz Mohammad Loni Palaw 8 6 14 40 673 Saifudin Nasar Khan Loni Palaw 5 4 9 40 674 Pir Mohammad A. Ghani Loni Palaw 3 4 7 140 Total 3305 3788 7093 71471 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Appendixe-G [1/5] Annexure G: Land to be acquired for Main Canal of Yatabad Integrated Scheme Land Acquired in main Canal Sr. Name and father’s name of Farmer Village Tribe Length Width (in No. (in (In Acre feet) feet) ) 177.1 1 Haji Jahangeer/Haji Zarif Manzaki Loni 440 2 1.8 177.1 2 Haji Shahjahan/H. Zarif Manzaki Loni 440 2 1.8 177.1 3 Mujeebullah/H.Shar Hassan Manzaki Loni 440 2 1.8 177.1 4 Jaffar Khan/Mohammad Husain Manzaki Loni 440 2 1.8 177.1 5 Mohammad Anwar/M.Husain Manzaki Loni 440 2 1.8 177.1 6 Kaleemullah/Haji Husain Manzaki Loni 440 2 1.8 177.1 7 Haji Noor Mohammad/Faizullah Ghazi Chena/Haleem Shar Loni 440 2 1.8 177.1 8 Haji Abdul Waheed/Haji Pahind Basharat Manzaki Loni 488 2 2.0 177.1 9 Baz Mohammad/ Gul Baran Basharat Manzaki Loni 394 2 1.6 177.1 10 Haji Ghazi/Gul Baran Basharat Manzaki Loni 558 2 2.3 177.1 11 Gul Khan/ Gul Baran Basharat Manzaki Loni 492 2 2.0 177.1 12 Sarbuland/ Gul Baran Basharat Manzaki Loni 656 2 2.7 177.1 13 Haji ferooz /Gul Baran Basharat Manzaki Loni 837 2 3.4 Shadoza 177.1 14 Ashaq/Noor Mohammad Jahangeer Sher i 394 2 1.6 Shadoza 177.1 15 Qalandar/Mir Jan Jahangeer Sher i 380 2 1.5 Shadoza 177.1 16 Kamal Khan/Qutab Khan Jahangeer Sher i 387 2 1.6 Shadoza 177.1 17 Ghulam Nabi/habibullah Jahangeer Sher i 328 2 1.3 Shadoza 177.1 18 Bangul Khan/Nasrullah Khan Jahangeer Sher i 446 2 1.8 Shadoza 177.1 19 Sanaullah/Dur Mohammad Jahangeer Sher i 387 2 1.6 177.1 20 Mohammad Hussan/Miya Khan Manzaki Loni 193 2 0.8 177.1 21 Ashraf / Jamal Khan Manzaki Loni 193 2 0.8 177.1 22 Ghulam Nabi/Habibullah Jahangeer Sher Loni 446 2 1.8 Shadoza 177.1 23 Baboo fathe / Lal Mohammad Jahangeer Sher i 328 2 1.3 177.1 24 Hussian shah / Mashik mera Jahangeer Sher Sayed 295 2 1.2 177.1 25 Kaser Khan /Hashim Jahangeer Sher Loni 420 2 1.7 Shadoza 177.1 26 Pir Mohammad/ Gul Baran Jahangeer Sher i 446 2 1.8 Shadoza 177.1 27 Haji Gawar Khan /Dad Khan Jahangeer Sher i 328 2 1.3 Shadoza 177.1 28 Asmatullah /Salah Mohammad Jahangeer Sher i 262 2 1.1 Shadoza 177.1 29 Mujeebullah/H.Shar Hassan Jahangeer Sher i 485 2 2.0 Shadoza 177.1 30 Bakht Mohammad /………… Jahangeer Sher i 360 2 1.5 Shadoza 177.1 31 Malik Mana/ Murad Mohmmad Jahangeer Sher i 328 2 1.3 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Appendixe-G [2/5] 177.1 32 Jat Abad(livestock depertment) GoB 6692 2 27.2 177.1 33 Mateen shah / Habib Shah Mankai Sayed 886 2 3.6 177.1 34 Ameen shah/Habib shah Mankai Sayed 328 2 1.3 177.1 35 Tawab Shah / Nawab Shah Mankai Sayed 328 2 1.3 177.1 36 Tayeb shah/ Nawab Shah Mankai Sayed 607 2 2.5 177.1 37 Temoor shah / Kutan shah Mankai Sayed 328 2 1.3 177.1 38 Qayum shah / Karam shah Mankai Sayed 558 2 2.3 177.1 39 Qasam shah / Karam Shah Mankai Sayed 328 2 1.3 177.1 40 Qadeem Shah/Ibrhim shah Mankai Sayed 935 2 3.8 177.1 41 Dost Mohammad Shah /Zair shah Mankai Sayed 607 2 2.5 177.1 42 Naeem Shah / Azeem Shah Mankai Sayed 328 2 1.3 177.1 43 Wali Shah / Azeem shah Mankai Sayed 558 2 2.3 177.1 44 Malik Noor Mohammad /Haji Sobidar Mankai Tareen 50 2 0.2 45 Malik Sattar /Malik Waheed Din Mohammad Kala Tareen 1155 177.1 4.7 46 Haji Bahdur / Gul Din Mohammad Kala Ustranai 984 177.1 4.0 47 Hainnudin Din Mohammad Kala Ustranai 1325 177.1 5.4 157.4 48 Ejaz Ahamed/ Noor Mohammad Ghazi Chena/Haleem Shar 1312 4 4.7 Sado Chena Asadullah 157.4 49 Malik Noor Mohammad /Haji Sobidar karez Tareen 1373 4 9.9 Sado Chena Asadullah 157.4 50 Kamal Khan/Noor Mohammad karez Tareen 1373 4 9.9 Sado Chena Asadullah 157.4 51 Akber Tareen / Haji Sobidar Khan karez Tareen 2746 4 9.9 Sado Chena Asadullah 157.4 52 Aslam Khan / Shobidar kahn karez Tareen 2746 4 9.9 Sado Chena Asadullah 157.4 53 Sarwar Khan / Noor Mohammad karez Tareen 2746 4 9.9 124.6 54 Aslam Khan / Shobidar Khan Ismail shar Tareen 2450 4 7.0 124.6 55 Zahir Khan/ Mohammad Aslam Ismail shar Tareen 1968 4 5.6 124.6 56 Shadi Khan/…………… Ismail shar Tareen 2933 4 8.4 124.6 57 Akbar Khan/Khan Badur Ismail shar Tareen 574 4 1.6 Sardar Shafiq/Sardar Faqeer 124.6 58 Mohammad Ismail shar/sardar shar Tareen 574 4 1.6 124.6 59 Abdul Rauf/Abdul Rashid Ismail shar Tareen 3248 4 9.3 124.6 60 Jalil Khan/Abdul Aziz Ismail shar Tareen 2450 4 7.0 124.6 61 Tahir Jan/ Haji Mohammad jan Ismail shar Tareen 2450 4 7.0 124.6 62 Sardar Shadozai/Ali mohammad Ismail shar Tareen 370 4 1.1 124.6 63 Mohammad Rahim/karam Ismail shar Tareen 164 4 0.5 124.6 64 Mohammad Razaq/ Karam Ismail shar Tareen 164 4 0.5 124.6 65 Sardar Shafiq /faqeer Mohammad Ismail shar Tareen 413 4 1.2 124.6 66 Malik Noor Mohammad /Haji Sobidar Ismail shar Tareen 295 4 0.8 124.6 67 Amir Jan/Samad Jan Ismail shar Tareen 446 4 1.3 124.6 68 Noor Shadozai/Malik Noor Mohammad Ismail shar Tareen 328 4 0.9 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Appendixe-G [3/5] 124.6 69 Faqeer Mohammad/ Salah Mohammad Ismail shar Tareen 492 4 1.4 124.6 70 Tareen Shadozai Communal Land Ismail shar Tareen 6561 4 18.8 124.6 71 Malik Habibullah/ Sahib Jan Ismail shar Tareen 370 4 1.1 124.6 72 Abdullah Jan/Mohammad Jan Din Mohammad Kala Tareen 413 4 1.2 124.6 73 Haji Gulmir Ismail shar Tareen 328 4 0.9 124.6 74 Fazal Mohammad/Baz Gul Din Mohammad Kala Tareen 393 4 1.1 68588. Total 0 250.2 Yatabad Branch Channel No. 1 Land Acquired Branch #1 Width Length Area Sr. No. Name and Father’s Name of Farmer Village Tribe of of canal in canal (in feet) Acres (in feet) 1 Haji Jahangeer/Haji Zarif Manzaki Loni 446 72 0.74 2 Haji Shahjahan/H. Zarif Manzaki Loni 892 72 1.47 3 Mujeebullah/H.Shar Hassan Manzaki Loni 453 72 0.75 4 Jaffar Khan/Mohammad Husain Manzaki Loni 873 72 1.44 5 Mohammad Anwar/M.Husain Manzaki Loni 656 72 1.08 6 Kaleemullah/Haji Husain Manzaki Loni 650 72 1.07 7 Haji Noor Mohammad/Faizullah Asadullah Killi Loni 623 72 1.03 Total 7.59 Total Length in Km 1.00 Yatabad Branch Channel No. 2 Land Acquired Branch #2 Lengt Width Sr. Area Name and Father Name of Farmer Village Tribe h of of No. in canal canal Acre (in (in s feet) feet) 1 Haji Abdul Waheed/Haji Pahind Basharat Manzaki Loni 2100 80 3.86 2 Baz Mohammad/ Gul Baran Basharat Manzaki Loni 1640 80 3.01 3 Haji Ghazi/Gul Baran Basharat Manzaki Loni 2362 80 4.34 4 Gul Khan/ Gul Baran Basharat Manzaki Loni 1410 80 2.59 5 Sarbuland/ Gul Baran Basharat Manzaki Loni 2000 80 3.67 6 Haji ferooz /Gul Baran Basharat Manzaki Loni 985 80 1.81 Total 19.3 Total Length in Km 3.00 Yatabad Branch Channel No. 3 Land Acquired Branch # 3 Sr. Name and Father’s Name of Length of Width of Area Village Tribe No. Farmer Branch canal Branch canal in (in feet) (in feet) Acres Jahangeer 1 Shar Jan/Mar Jan Sher Shadozai 492 95 1.07 Jahangeer 2 Ashaq/Noor Mohammad Sher Shadozai 328 95 0.72 Jahangeer 3 Qalandar/Mir Jan Sher Shadozai 459 95 1.00 Jahangeer 4 Kamal Khan/Qutab Khan Sher Shadozai 558 95 1.22 Jahangeer 5 Gawar Khan/Dad Khan Sher Shadozai 377 95 0.82 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Appendixe-G [4/5] Jahangeer 6 Malik Hazar Khan/Khairo Sher Shadozai 558 95 1.22 Jahangeer 7 Ghulam Nabi/habibullah Sher Shadozai 1280 95 2.79 Jahangeer 8 Pir Mohammad/ Gul Baran Sher Shadozai 820 95 1.79 Jahangeer 9 Sarwar Jan/Sakhi Jan Sher Shadozai 705 95 1.54 Jahangeer 10 Ghulam Nabi/habibullah Sher Shadozai 721 95 1.57 Jahangeer 11 Bangul Khan/Nasrullah Khan Sher Shadozai 525 95 1.14 Jahangeer 12 Sanaullah/Dur Mohammad Sher Shadozai 185 95 0.40 Mohammad Hussan/Miya 13 Khan Manzaki Loni 467 95 1.02 14 Ashraf / Jamal Khan Manzaki Loni 468 95 1.02 Jahangeer 15 Ghulam Nabi/habibullah Sher Loni 985 95 2.15 Jahangeer 16 Baboo fathe / Lal Mohammad Sher Shadozai 623 95 1.36 Jahangeer 17 Hussian shah / Mashik mera Sher Sayed 525 95 1.14 Jahangeer 18 Kaser Khan /Hashim Sher Loni 1017 95 2.22 Jahangeer 19 Pir Mohammad/ Gul Baran Sher Shadozai 148 95 0.32 Jahangeer 20 Haji Gawar Khan /Dad Khan Sher Shadozai 590 95 1.29 Jahangeer 21 Asmatullah /Salah Mohammad Sher Shadozai 787 95 1.72 Jahangeer 22 Mujeebullah/H.Shar Hassan Sher Shadozai 1017 95 2.22 Jahangeer 23 Bakht Mohammad Sher Shadozai 525 95 1.14 Jahangeer 24 Malik Mana/ Murad Mohmmad Sher Shadozai 492 95 1.07 Jahangeer 25 Ghulam Nabi/habibullah Sher Shadozai 328 95 0.72 Jahangeer 26 Sarwar Jan/Abdullah Jan Sher Shadozai 623 95 1.36 Jahangeer 27 Madad Khan /Sar Buland Khan Sher Shadozai 558 95 1.22 Total 35.25 Yatabad Branch Channel No. 4 Land Acquired Branch # 4 Sr.N Name and Father Name of Lenth of Width of Area in o Farmer Village Tribe canal (in feet) canal (in feet) Acres 1 Jat Abad(livestock depertment) 25322 100 58.13 Yatabad Branch Channel No. 5 Land Acquired Branch # 5 Lenth of canal (in Width of Area in Sr.No. Name and Father Name of Farmer Village Tribe feet) canal (in feet) Acres 1 Mateen shah / Habib Shah Mankai Sayed 394 92 0.83 2 Ameen shah/Habib shah Mankai Sayed 1640 92 3.46 3 Tawab Shah / Nawab Shah Mankai Sayed 1510 92 3.19 4 Tayeb shah/ Nawab Shah Mankai Sayed 1033 92 2.18 5 Temoor shah / Kutan shah Mankai Sayed 558 92 1.18 6 Qayum shah / Karam shah Mankai Sayed 1345 92 2.84 7 Qasam shah / Karam Shah Mankai Sayed 623 92 1.32 Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Appendixe-G [5/5] 8 Qadeem Shah/Ibrhim shah Mankai Sayed 1640 92 3.46 9 Dost Mohammad Shah /Zair shah Mankai Sayed 837 92 1.77 10 Naeem Shah / Azeem Shah Mankai Sayed 920 92 1.94 11 Wali Shah / Azeem shah Mankai Sayed 1640 92 3.46 12 Naik Mohammad/Din Mohammad Mankai Sayed 951 92 2.01 Malik Noor Mohammad /Haji 13 Sobidar Mankai Tareen 886 92 1.87 Saedo chena Kala 14 Haji Gul Mir /Haji Khan Ustranai 360 92 0.76 Samandar Khan / Haji Saedo chena Kala 15 Mohammad Gul Khan Ustranai 755 92 1.59 Saedo chena Kala 16 Dad Khan / Abdullah Jan Khan Ustranai 1673 92 3.53 Saedo chena Kala 17 Abdullah jan / Mohammadan Khan Ustranai 1148 92 2.42 Saedo chena Kala 18 Malik Janan /Khair Mohammad Khan Ustranai 950 92 2.01 Saedo chena Kala 19 Malik Bahdur Khan/ Haji Gul Khan Ustranai 656 92 1.39 Total 41.22 Yatabad Branch Channel No. 6 Land Acquired Branch #6 Lenth Width of of Area canal canal in Sr.N (in (in Acre o. Name and Father Name of Farmer Village Tribe feet) feet) s 1 Mouli Juma Khan / Bara Khan Ghazi Chena Tareen 2887 105 6.96 2 Khair Mohammad / Sultan Mohammad Ghazi Chena Ustranai 984 105 2.37 3 Mohammad Khan / Nazar Mohammad Naway Chena Ustranai 984 105 2.37 4 Malik Sattar /Malik Waheed Din Mohammad Kala Tareen 3290 105 7.93 5 Haji Bahdur / Gul Din Mohammad Kala Ustranai 3018 105 7.27 6 Haynadin / ,,,,,,,,,,,,, Din Mohammad Kala Ustranai 3610 105 8.70 7 Khair Mohammad / …………………. Din Mohammad Kala Ustranai 2362 105 5.69 8 Malik Amir Mohammad / Abdul Rehman Din Mohammad Kala Ustranai 656 105 1.58 9 Malik Faqeer Mohammad/ Abdul Rehman Din Mohammad Kala Ustranai 426 105 1.03 10 Malik Dewa Khan/ Abdullah Khan Din Mohammad Kala Ustranai 328 105 0.79 11 Sahib Khan / Gul Bahran Din Mohammad Kala Ustranai 426 105 1.03 12 Fateh Mohammad / Kala Khan Din Mohammad Kala Ustranai 492 105 1.19 13 Haji Gul Mir /Haji Ghazi Chena Ustranai 1969 105 4.75 Saedo chena Kala 14 Samandar Khan / Haji Mohammad Gul Khan Ustranai 984 105 2.37 Saedo chena Kala 15 Dad Khan / Abdullah Jan Khan Ustranai 984 105 2.37 Saedo chena Kala 16 Abdullah jan / Mohammadan Khan Ustranai 656 105 1.58 Saedo chena Kala 17 Malik Janan /Khair Mohammad Khan Ustranai 820 105 1.98 Saedo chena Kala 18 Malik Bahdur Khan/ Haji Gul Khan Ustranai 984 105 2.37 19 Ejaz Ahamed/Noor Mohammad Ghazi Chena Ustranai 3937 105 9.49 Total 71.8 Yatabad Branch Channel No. 7 Land Acquired Branch #7 Lenth Width of of Area canal canal in (in (in Acre S.No Name and Father Name of Farmer Village Tribe feet) feet) s Social Impacts Assessment & Mitigation Plan (SIAMP) for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Appendixe-G [6/5] 1 Malik Noor Mohammad /Haji Sobidar Kili Asadullah Khan Tareen 2584 92 5.46 2 Kamal Khan/ Noor Mohammad Kili Asadullah Khan Tareen 2583 92 5.46 10.9 3 Akber Tareen / Haji Sobidar Khan Kili Asadullah Khan Tareen 5167 92 1 10.9 4 Aslam Khan / Shobidar kahn Kili Asadullah Khan Tareen 5167 92 1 10.9 5 Sarwar Khan / Noor Mohammad Kili Asadullah Khan Tareen 5167 92 1 43.6 Total 5 Yatabad Branch Channel No. 8 Land Acquired Branch #8 Lenth Width of of Area canal canal in (in (in Acre S.No Name and Father Name of Farmer Village Tribe feet) feet) s 1 Malik Noor Mohammad /Haji Sobidar Kili Asadullah Khan Tareen 3690 85 7.20 2 Akber Tareen / Haji Sobidar Khan Kili Asadullah Khan Tareen 3690 85 7.20 3 Aslam Khan / Shobidar kahn Kili Asadullah Khan Tareen 3690 85 7.20 4 Sarwar Khan / Noor Mohammad Kili Asadullah Khan Tareen 3690 85 7.20 Total 28.8 Yatabad Branch Channel No. 9 Land Acquired Branch #9 Lenth Width of of Area canal canal in (in (in Acre S.No Name and Father Name of Farmer Village Tribe feet) feet) s 1 Aslam Khan / Shobidar kahn Ismail Shaar Tareen 1607 80 2.95 2 Zahir Khan/ Mohammad Aslam Ismail Shaar Tareen 1607 80 2.95 3 Shadi Khan Ismail Shaar Tareen 1607 80 2.95 4 Akbar Khan/Khan Badur Ismail Shaar Tareen 1607 80 2.95 5 Sardar Shafiq/S. Faqeer Mohammad Ismail Shaar Tareen 1312 80 2.41 6 Abdul Rauf/Abdul Rashid Ismail Shaar Tareen 820 80 1.51 7 Jalil Khan/Abdul Aziz Ismail Shaar Tareen 1017 80 1.87 8 Tahir Jan/ haji Mohammad jan Ismail Shaar Tareen 1082 80 1.99 Total 19.6 Yatabad Branch Channel No. 10 Land Acquired Branch # 10 Lenth Width of of Area canal canal in (in (in Acre S.No Name and Father Name of Farmer Village Tribe feet) feet) s 1 Sardar Shadozai/Ali Mohammad Ismail Shaar Tareen 328 80 0.60 2 Mohammad Rahim/karam Ismail Shaar Tareen 475 80 0.87 3 Mohammad Razaq/ Karam Ismail Shaar Tareen 476 80 0.87 4 Sardar Shafiq /Faqeer Mohammad Ismail Shaar Tareen 688 80 1.26 5 Mohammad Shohaib/Niaz Mohammad Ismail Shaar Tareen 951 80 1.75 6 Amir Jan/Samad Jan Ismail Shaar Tareen 558 80 1.02 7 Noor Shadozai/Malik Noor Mohammad Ismail Shaar Tareen 492 80 0.90 8 Faqeer Mohammad/ Salah Mohammad Ismail Shaar Tareen 1050 80 1.93 9 Noor Gul/ Allah Yar Khan Ismail Shaar Tareen 690 80 1.27 Total 10.5 Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [1/30] Annexure H: Gender Action Plan GENDER ACTION PLAN Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [2/30] TABLE OF CONTENTS Contents Page No. ABBREVIATIONS 3 EXECUTIVE SUMMARY 6 INTRODUCTION & RATIONALE 6 THE PROJECT CONTEXT 6 SOCIAL DEVELOPMENT 6 GENDER ASSESSMENT 7 APPROACHES TO GENDER ACTION PLAN 9 MONITORING & EVALUATION 9 INTRODUCTION THE PROJECT CONTEXT 10 RATIONALE OF THE GENDER ACTION PLAN 11 OBJECTIVE OF GENDER ACTION PLAN 12 GENDER ANALYSIS 13 GENDER IN CONTEXT OF PAKISTAN 13 GENDER IN CONTEXT OF BALUCHISTAN 15 GENDER ACTION PLAN 29 RISKS AND ASSUMPTIONS 33 MONITORING AND EVALUATION 33 Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [3/30] ABBREVIATIONS AP Affected Person BIWRMDP Baluchistan Integrated Water Resources Management and Development Project CEDAW Convention to Eliminate Of All Forms of Discrimination against Women CFS Child Friendly Spaces CSP Child Support Programs CWS Community Social Organization CSO Civil Society Organization DHO District Health Officer DSP Deputy Superintendent of Police EPP Education Promotion Plan EM External Monitor EMIS Education Management Information System GAP Gender Action Plan GCH Gender and Community Health GGGI Global Gender Gap Index GGGR Global Gender Gap Report GPI Gender Parity Index HDI Human Development Index HIV Human Immunodeficiency Virus IDI In Depth interview ILR Income and Livelihood Restoration IPRI International Property Right Index KA Karakurum Agency KH Khuzdar LHV Lady Health Visitors LHW Lady Health Workers LGO Local Government Ordinance MFLO Muslim Family Law Ordinance MGDs Millennium Development Goals MPR Monthly Progress Report M&E Monitoring and Evaluation Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [4/30] MNA Member of National Assembly MMT Migration Management MoWD Ministry of Women Development NCSW National Commission on Status of Women NER National Education Ratio NER Net Enrolment Rate NFE Non-Formal Education NGO Non-Governmental Organization NPA National Plan of Actions NPEDW National Policy for Empowerment and Development of Women OP Operational Policy PATA Provincially Administered Tribal Area PCSW Provincial Commission on Status of Women PIC Public Information Cell PRO Project Resettlement Office PRSP Poverty Reduction Strategy Paper P&D Planning and Development PHAP Public Health Action Plan PRSP Poverty Reduction Strategy Paper RAP Resettlement Action Plan RHC Rural Health Centers R&R Relocation and Resettlement SE Socio Economic SRMP Social and Resettlement Management Plan Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [5/30] EXECUTIVE SUMMARY INTRODUCTION & RATIONALE The Project Gender Strategy comprising of a detailed gender analysis and a comprehensive Gender Acton Plan (GAP) is an important part of social and environmental safeguards compliance which is mandatory for approval of infrastructure development projects under the World Bank Operational Policies. The World Bank recognizes that gender issues are important dimensions of its poverty reduction, economic growth, human well-being and development effectiveness agenda. The current monitoring framework for gender mainstreaming brings together the monitoring processes for the gender dimensions of development as specified in the gender mainstreaming strategy and OP/BP 4.20, together with the monitoring processes common to all Bank policies and those specific to safeguard policies. The GAP presented herein, has been developed during the design phase of Baluchistan Integrated Water Resources Management & Development Project (BIWRMP) as part of the overall Social and Resettlement Management Plan (SRMP). The GAP presents strategies and action to ensure project benefits reach women in the project area and vulnerable population that might be marginalized. This Plan has carefully been developed through stakeholder consultations and keeping in view the local context, ground realities and customs prevailing in the project area. THE PROJECT CONTEXT BIWRM Project is a timely intervention and investment in the sustainable development of Balochistan by addressing a comprehensive range of issues which have been faced by the Province over the past several decades. Balochistan has high potential for Agricultural and Horticultural production and enjoys a variety of rich soils and suitable climates but has a serious lack of water resources to be able to utilize this potential fully. The Government of Baluchistan has obtained a Loan for Baluchistan’s Small Scale Irrigation Project (BSSIP) to improve management of water in the Pishin-Lora basin. The part of proceeds is being used for a comprehensive study of the Nari River Basin (NRB), comprising of three major tasks: a) option study; b) detailed feasibility; and c) detailed design and contract bidding for the NRB Water Resources Management and Development (NRB-WRMD) Project to support efforts of Government of Baluchistan for seeking investment. The Nari River Basin Irrigation Project has been designed to ‘improve management of water resources in the selected river basins of Baluchistan through working with the government, communities and farmers’. With the proposed development objective of improving the management of water resources in the selected river basins of Baluchistan through working with the government, communities and farmers the project is ensuring that women and men are engaged in the design and implementation of the project. As part of the “Integrated River Basin Management” approach covering two river basins; namely Porali and Nari, the second project with its target towards conservation, management and development of water, land and related resources across sectors is focused on the Porali River Basin to maximize the economic and social benefits derived from water resources in an equitable manner while preserving and, where necessary, restoring freshwater ecosystems. Porali River is one of the four rivers of Balochistan falling into Arabian Sea. The 328 kilometer long river originates from the hills of Wadh mountain range in the district of Khuzdar and runs through the plains of Lasbela District. The proposed PRBD Project is targeted. The project will contribute to the economic growth of the villages by reducing the uncertainty of irrigation water availability and contributing to sustainable self-sufficiency by encouraging farmer participation, community mobilization, training and capacity building initiatives of key stakeholders and enabling land users to improve crop production. This Gender Action Plan and implementation proposal has been jointly developed by staff of the World Bank, FAO and the relevant Directorates of the Department of Agriculture and Department of Livestock of the Government of Balochistan. Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [6/30] SOCIAL DEVELOPMENT Baluchistan as one of the largest provinces in terms of land area comprises of 44 percent (347,190 square kilometers) of the national territory and smallest in terms of population, constituting of about 5 percent of the total country’s population. It has the distinction of having the shortest access to warm waters for land locked Afghanistan and Central Asian republics. It has the lowest social indicators among the four provinces in Pakistan. It scores lowest in 10 key indicators for education, literacy, health, water and sanitation for 2006-07. Education is marked by the lowest access, lowest efficiency and highest dependency on public schooling. Fewer than two in five adults are literate, reflecting a low-skill workforce. Turning to health, one in two infants does not receive full immunization, which is the most cost-effective, equitable health intervention available. Three in four women do not receive tetanus toxoid during their last pregnancy, exposing their babies to the risk of infant mortality due to neonatal tetanus. Poor water and sanitation contribute to low health status. More than one in two households have to rely on dug wells, rivers, canals and streams for drinking water, and four in five families have no flush toilet (GOB 2004; GOB and UNICEF 2010).NRB is having quite variable social development index, as 15 districts falling in NRB are categorized in four categories of social development index – high, medium, low and lowest. The districts of Naseerabad, Jaffarabad, Ziarat, Loralai, Qilla Saifullah, Kalat, Khuzdar and Mastung are having relatively better social development index compared to districts of other basins, except the Quetta district. Other districts of NRB like Hernai, Bolan and BarKhan have relatively low social development index. Dera Bugti and Kohlu districts have the lowest social development index (GOB 2004; GOB and UNICEF 2010). In Baluchistan like many other cultures, women are primarily responsible for the use and management of water resources, sanitation and health at the household level. Over the years, women have accumulated an impressive store of environmental wisdom, being the ones to find water, to educate children in hygiene matters and to understand the impact of poor sanitation on health. At the same time, women and girls are often obliged to walk many hours every day fetching water, while men are rarely expected to perform such tasks. When water is scarce, Baluchi women and girls like many others in the world also pay dearly. They may have to travel longer distances to obtain water, and conditions are more dangerous. Conflicts that exacerbate water scarcity hence lead to a double hardship for women: the negative impacts of lack of water are compounded by the well-documented abuses against women’s fundamental human rights that occur during conflict and in the affected areas. Baluchi women also suffer due to natural catastrophes; Women are disproportionately affected by natural disasters, such as floods and earthquakes, as a result of gender inequalities regarding political and economic status, human rights, education and health. Women have high death rates in disasters, as they often do not receive warnings or other information about hazards and risks. Their mobility of Baluchi women in disasters may be restricted or affected due to existing cultural and social constraints in the province.6 GENDER ASSESSMENT Baluchistan is the province with the worst record on gender equality. A measure of sex-based discrimination was 115 according to the population census, compared to 1I2 in Sindh, 107 in Punjab, and 104 in KPK. Education and immunization indicators, expressed as female and male attainment, confirm this picture. Baluchistan scores low in all indicators. The only exception is middle school enrolment, where KPK ranks lowest, but even for this indicator, the level of female middle NER and GER is lower in Baluchistan than KPK. The gender gap is also present in the labor market. The participation rates of women aged 10 years or older are close to 60% lower than those of men in the same age group (World Bank 2008 b,c; 2012a).  More than three fourths of the population live in rural areas and depend on either agricultural sector activity or employment opportunities in the industry or services sectors. Almost a sixth of the farms have less than a hectare of land. The large majority of farms (82%) are owned by the cultivator of the land, while 15% are cultivated by tenant farmers.7 In almost all cases, the official land owner 6 http://www.un.org/esa/sustdev/csd/csd13/documents/bground_2.pdf 7 Ibid, Table 66, p118 Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [7/30] would be the (male) head of the family, and much of the agricultural work is undertaken by family members although larger farms and orchards also hire labor.  Being a male dominated society the women are given very limited choice in family and social affairs. In most of the social groups men hold a monopoly on power. All political and religious and other social leaders are men. Denial of women rights in matters of property and inheritance as recognized by Islam, is due to the cultural code of honor, stemming from the male value system. Women are rarely allowed to own productive assets such as land or livestock.  Women in rural areas are up to three times as likely to work as women in urban areas. While low female participation cuts across all provincial labor markets, Baluchistan has the lowest urban participation rate, and, after Sindh, the second lowest rural participation rate. The persistent differences in gender access to resources and spaces are related to entrenched patriarchal tribal norms and customs. The same cultural restrictions that limit women’s access to education and health facilities also constrain their opportunities to get jobs. Mobility restrictions are among the most important constraints to women’s social and economic advancement (World Bank 2008). They shape the sectors, occupations, and locations of their work. APPROACHES TO GENDER ACTION PLAN Most development interventions in agriculture and livestock sectors have been designed to meet only the needs of men. Gender sensitive development approaches are now being introduced to look at the impact of development on both men and women and to tailor interventions to ensure more equity in the roles and responsibilities of both. Engagement of men will create sustained ownership in the project to address gender inequities in the system. Change is possible, notwithstanding the cultural and social fabric of the province. The Gender Action Plan (GAP) below has been developed to ensure that women benefit from all project activities and equitably participate in decision-making. Effort will be made to ensure equitable participation of women in all project activities from community mobilization through to monitoring and impact assessment. In addition to mainstreaming women in all planned project activities, the gender action plan also proposes design and implementation of specialized projects and interventions strategically designed to promote active engagement of women with the larger Nari River Basin Irrigation Project. These include design of specialized water and irrigation projects designed to improve women’s practical and strategic gender needs such as improved access to water for livestock 8. Kitchen gardening, backyard poultry demos and livestock demos will be part of the additional programs which will be developed and implemented for women to promote income enhancement through entrepreneurial training and skill development in relevant areas. In addition to entrepreneurship training, women will also be assisted vis-à- vis access to market, overall value chain development as well as access to and use of technology. As an add-on to the project, the household as whole will be oriented to effective nutrition practices. As part of capacity building women and men will be trained in the above mentioned areas as master trainers. Agriculture development requires genuine partnerships with farming communities which includes men and women. Engagement and dialogue is a major priority for the identification of the problems, priorities and opportunities to develop agriculture. Community organizing is a first step and sufficient time needs to be allowed for a Community Organization (CO) to develop group cohesion, leadership skills and capacity to formulate and articulate a vision and action plans for local development. Agency of women and their representation and participation is necessary for ensuring inclusion and equitable distribution of benefits. MONITORING & EVALUATION Gender Sensitive Monitoring and Evaluation (M&E) will be essential to objectively ascertain progress towards the achievements of the objectives of gender development and in tracking the performance of the action plan. The key aspects of the M&E framework for this strategy include: (a) monitoring of the gender 8 In the Balochistan cultural context the care and decision-making around livestock is largely the woman’s responsibility, even though the ownership may still be with men. Improving access to water for livest ock often significantly reduces the woman’s workload. Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [8/30] development activities as they happen and (b) assessing the outcomes and impacts of the actions on a regular basis. INTRODUCTION 1.1 THE PROJECT CONTEXT This World Bank funded $ 200 million BIWRM Project is a timely intervention and investment in the sustainable development of Baluchistan by addressing a comprehensive range of issues which has been faced by the Province over the past several decades. Baluchistan has high potential for Agricultural and Horticultural production and enjoys a variety of rich soils and suitable climates but has a serious lack of water resources to be able to utilize this potential fully. The Province has its rightful share of the Water Resources of the Indus River system, but does not utilize its full share due to much of the Province being at altitudes higher than the Indus River system itself Baluchistan suffers from widespread degradation of its Land and Water Resources which impact negatively on the ability for most of the communities to make a viable livelihood. The BIWRM Project addresses all the major issues which will result in more sustainable management of Land and Water Resources in an integrated manner, leading to a sustainable livelihood for the communities in the target Project areas. The Government of Baluchistan has obtained a Loan for Baluchistan’s Small Scale Irrigation Project (BSSIP) to improve management of water in the Pishin-Lora basin. The part of proceeds is being used for a comprehensive study of the Nari River Basin (NRB), comprising of three major tasks: a) option study; b) detailed feasibility; and c) detailed design and contract bidding for the NRB Water Resources Management and Development (NRB-WRMD) Project to support efforts of Government of Baluchistan for seeking investment. GIS database was developed by updating available data in vector and MAP OF NRB AND THE SIX SUB BASINS raster formats to prepare maps for the NRB and sub-basins encompassing streams (locally named as Ruds) in the north which joins Loralai tributary to become Beji tributary. Afterwards, at the confluence of the Beji and the Khost tributaries in the Toba Kakar range 6.5 kms to the east of Spera Ragha, it is named as Nari River. It outfalls in to the Hamal Lake in Sindh and then ultimately into the Manchar Lake, which further drains into the Indus River. Thus it is a tributary of the Indus river system and an important basin of Baluchistan. The delineated boundaries of the NRB were marked on the SoP topographic sheets at a scale of 1:50,000 considering the drainage pattern and the water divide. The basin was further sub-divided in to six sub-basins representing nine tributaries of the NRB. Baluchistan offers some of the best assets for development and is generously bestowed with natural and location resources. It possesses the largest land area of any province and vast rangelands. Its southern border makes up about two thirds of national coastline, giving access to a large pool of fishery resources. It is ideally situated for trade with Iran, Afghanistan, Central Asia and countries of the Persian Gulf. Over the last four decades, it supplied natural gas to Pakistan’s economic centers, supporting country’s industrialization. The province also claims large deposits of coal, copper, lead, gold and other minerals. In the past, Baluchistan’s economy has not done well. The province has Pakistan’s most anemic growth record, worst infrastructure, severe water crisis, and weakest fiscal base. The poor economic performance leads to poor living standards. Baluchistan has the highest poverty along with KPK, lowest social indicators, and, in parts of the province, the weakest state institutions. 1.2 RATIONALE OF THE GENDER ACTION PLAN Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [9/30] The Gender Strategy and Action Plan has been designed after consultation and participation of women and other stakeholders of the project area to mitigate these adverse impacts efficiently and timely. The gender strategy which cut across all project components takes into consideration the fact that Baluchistan has major challenges in terms of equitable participation of women due to the existing gender stereotypes and norms. The Gender Strategy is focused on the thematic areas namely: (i) pro poor engagement and inclusion of vulnerable and marginalized population segments especially women; (ii) Sensitization of communities through engagement of women and men; (iii) increased access for women through entrepreneurship activities and subsidy grants via agriculture and livestock; (iv) Capacity Building for women through exposure visits and sill based specific trainings to improve agricultural productivity; (v) Monitoring, evaluation and knowledge sharing .Gender disaggregated data and mainstreaming gender across the entire program have been provided a thrust. The specific gender disaggregated qualitative and quantitative indictors along with the various proposed interventions to build the existing capacity of the staff and partners will lead to greater understanding to implement the Gender Action Plan. In the construal context of Baluchistan the specific strategies have been designed to ensure that maximum engagement and access can be achieved with minimum disturbance in the social thread of the society through creation of win- win situation. The GAP is guided by the principle that development initiatives for project affected persons should incorporate the priorities and needs of women and give them equal opportunities to access benefits through development of this Project. This report ensures that the lifestyle/ livelihood of women affected by the project are restored to levels prevailing before start of the project. World Bank seeks to promote the improvement of the living standards of the people affected by the project activities. The present Gender Action Plan (GAP) is developed in accordance with laws and provisions of GoP and World Bank policy for Gender and Development (OP 4.20).The Gender Strategy and the GAP include detailed guidelines of how the institutional development should focus on the development and training programs for the engagement of women to ensure sustainable development and productivity enhancement through inclusion. Two detailed social assessments have been conducted including the Social Impact Assessment of the Nari and Porali River Basins highlight major gender related concerns and inform the gender strategy about the context of Baluchistan and problems faced by the women in that region to access resources and raise their agency in decision making processes. According to the assessments and being a male dominated society, the women are given very limited choice in family and social affairs. In most of the social groups men hold a monopoly on power. All political and religious and other social leaders are men. Denial of women rights in matters of property and inheritance as recognized by Islam, is due to the cultural code of honor, stemming from the male value system. It often entails subordination of women and seclusion of women from the social order. In some cases, especially in religious families, women right of inheritance Gender Issues in Porali River Basin Area Percent Response on Issues Identified and Prioritization #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 Fuelwood Availability/Collection 0 0 100 0 0 0 0 0 0 0 High Domestic Water Supply 100 0 0 0 0 0 0 0 0 0 Very High Sanitation 100 0 0 0 0 0 0 0 0 Very High Health 100 0 0 0 0 0 0 0 0 Very High Education 100 0 0 0 0 0 0 0 Very High Kitchen Gardening 0 0 0 0 0 0 0 0 0 0 Household Fruit/Fuelwood Prod 0 0 0 0 100 0 0 0 0 0 Medium Honey Production 0 0 0 0 0 100 0 0 0 0 Medium Rural Poultry - Desi Chickens 0 0 0 0 100 0 0 0 0 0 Medium Value Addition in Fruits 0 0 0 0 0 0 0 0 0 0 Access to Market 0 0 0 100 0 0 0 0 0 0 High Access to Credit 0 0 0 100 0 0 0 0 0 0 High is practiced. Women are rarely allowed to own productive assets such as land or livestock. And they generally lack control over their labor and its proceeds. Moreover, their economic contribution is discounted in most official statistics. Very High – Priority #1 and #2; High – Priority #3 and #4; Medium - Priority #5 and more Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [10/30] The industries of Hub and Winder employ some women, but they live in Karachi and come daily for their jobs. Most development interventions in agriculture and livestock sectors have been designed to meet only the needs of men. Gender sensitive development approaches are now being introduced to look at the impact of development on both men and women and to tailor interventions to ensure more equity in the roles and responsibilities of both. Change is possible, notwithstanding the cultural and social fabric of the province. Strategies will be implemented to ensure that gender issues are addressed by: giving support to women in existing roles, for example in collecting water and fuel wood, and in making domestic tasks easier to perform through the introduction of improved technologies; encouraging women to take on new roles in sectors such as livestock feeding and fattening, fruit processing, rural poultry, and water health and hygiene, and ensuring they have equal access to training in these skills; involving women in the implementation of BIWRMDP Project and opening up more opportunities for women in institutions of government. The survey conducted to prioritize the issues in the social impact assessment has yielded some interesting results given in the Tables above for Porali and Nari River Basin areas. The tables show that sanitation, water supply, health and education were identified as high priority areas, whereas – kitchen gardening, house hold fruits and embroidery also came out as areas for further investments. Women in the Project area are traditionally rich in hand-made embroidery. Almost every household in the Project area have skills of embroidery and tailoring. Women Organization: fuel wood collection; training and demonstration were also placed as high priority areas. Gender Issues in Nari River Basin Area Percent Response on Issues Identified and Prioritization #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 Fuel wood Availability / 0 0 100 0 0 0 0 0 0 0 Collection High Domestic Water Supply 0 0 100 0 0 0 0 0 0 0 High Sanitation 100 0 0 0 0 0 0 0 0 0 Very High Health 100 0 0 0 0 0 0 0 0 0 Very High Education 0 100 0 0 0 0 0 0 0 0 Very High Kitchen Gardening 0 0 0 0 0 0 0 0 0 0 Household Fruit/Fuelwood Prod 0 0 0 100 0 0 0 0 0 0 High Honey Production 0 0 0 0 0 100 0 0 0 0 Medium Rural Poultry - Desi Chickens 0 0 100 0 0 0 0 0 0 0 High Value Addition in Fruits 0 0 0 0 0 0 0 0 0 0 Access to Market 0 0 0 0 0 0 0 100 0 0 Medium Access to Credit 0 0 0 0 0 0 0 100 0 0 Medium 1.3 OBJECTIVES OF THE GENDER ACTION PLAN The GAP has both short term and long term objectives that aim to minimize social vulnerability of women and children, build the base for local women to come forward and play a role in decision making, and ultimately develop an environment for women to participate in income generation and employment opportunities in the long-term. Objectives of Gender Action Plan are as follows:  To create a conducive environment for addressing gender related issues pertaining to equitable access to resources and decision making  Engagement of the stakeholders including men and women to develop a favorable environment that educates the local project area men to encourage and pave the way for women participation in project development including agriculture and livestock;  Capacity building and Gender sensitization of Project staff including Office staff, government departments and other stakeholders;  To ensure women’s participation in planning, design and implementation of the project  To engage women into productive and paid activities through offering subsidies and grants for entrepreneurship initiatives.  To conduct an analysis of women roles in decision making, division of labor, development priorities and other variables that will impact on their participation in the project; and guide the project design to avoid increasing the burden on women. Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [11/30]  Awareness raising about the project benefits to all population including women and children; Thus the overall objective of GAP is to analyze existing conditions of women in project area, to assess the positive and negative impacts of project activities on women and to devise the measures accordingly. 2 GENDER ANALYSIS Prior to the preparation of the GAP and approaches adopted for developing the GAP for the Baluchistan Integrated Water Resources Management & Development Project (BIWRMP), it was imperative to have an overview of the overall gender situation at the national and local context. . This section provides an overview of the overall gender situation in Pakistan, with a detailed gender analysis of the gender inequities in Baluchistan province cut across demographics, health, education and economic participation. The analysis also provides details of the various sectors and focuses on the agriculture, water management and livestock segments to be able to direct the project activities towards those performing the particular tasks. Men’s and women’s involvement in each stage of the agricultural cycle, on their shared as well as unshared tasks depends on the degree of the fixity of the gender division of labor. The objective is to ensure that women are actively included in the project and are not disadvantaged by it. 2.1 GENDER IN CONTEXT OF PAKISTAN The social and cultural context of Pakistani society is predominantly patriarchal. Men and women are conceptually divided into two separate worlds. Male members of the family are given better education and are equipped with skills to compete for resources in the public arena, while female members are imparted domestic skills to be good mothers and wives. Lack of skills, limited opportunities in the job market, and social and cultural restrictions limit women’s chances to compete for resources in the public arena. This situation has led to the social and economic dependency of women that becomes the basis for male power over women in all social relationships. This has also led to a low level of resource investment in women by the family and the State. Patriarchal structures are relatively stronger in the rural and tribal setting where local customs establish male authority and power over women’s lives. They are given limited opportunities to create choices for themselves in order to change the realities of their lives. On the other hand, women belonging to the upper and middle classes have increasingly greater access to education and employment opportunities and can assume greater control over their lives. The Government of Pakistan has committed to promote gender justice and equality, yet women are highly vulnerable in all contexts and subject to various forms of widespread discrimination and violence. In the tribal cultures in some provinces of Pakistan young girls are given as ‘ van’9to opponent tribes for settling tribal blood feuds. Although, this custom is illegal in Pakistan and a serious crime it is still in practice, though rarely, in some areas. Recently the courts in Pakistan have begun taking serious notice and action against the continuation of the practice. Similarly, honor killing although a crime is still an ongoing practice especially in the tribal set ups despite the legislation. The Constitution of Pakistan (1973) declares that all citizens are equal before the law and are entitled to equal protection. It prohibits discrimination on the basis of sex and commits the State to take steps to ensure the full participation of women in all spheres of life. It guarantees free and compulsory education as a fundamental right in Article 25 A, to both boys and girls of age five to sixteen years. The Constitution also protects the women’s rights to inheritance as per Shariat. Whereas, the constitution guarantees equality, freedom, rights and dignity to all of its citizens, in actual practice women are subjugated to marginalization in most of the social, cultural and economic fields. Pakistan has been ranked 93rd out of 115 in property rights protection and 86th in gender equality in the International Property Rights Index (IPRI) 2008. 9 Vani is a tribal custom of child marriage in tribal areas of Pakistan to settle blood feuds. This custom is practiced among the different tribes and clans. Young girls are married by force to members of other tribes and clans to resolve the blood feuds. This is a replacement of blood money ‘Dayyat’ the tribe is to pay to settle the feud. Such decisions are taken by the jirga, the tribal institution Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [12/30] Gender gap has been prominent in Pakistan and widening further. According to the recent Global Gender Gap Report, Pakistan ranks 134 out of 135 countries in the world on the Global Gender Gap Index (GGGI). Economic participation reflects poor performance of 22%. In terms of wage equality, it is at 110 out of 135 countries. Educational figures rank Pakistan at 129, with 40% female literacy rate. Primary enrollment is 67% with decline in secondary education enrollment to 29%. Health and survival ranks at 123. Infant mortality rate per 1,000 live births at the age of one is 70% and maternal mortality ratio, per 100,000 live births is 260 on a scale of 150 and 500. Performance of Pakistan in the GGGI over the years has been low as traced through the following table depicting Pakistan’s ranking against the total number of countries. It reflects a decline from 112 out of 115 countries in 2006 to 134 out of 135 in 2012. Gender Gap Ranking of Pakistan Countries 2012 2011 2010 2009 2008 2007 2006 Total No. of Countries 135 135 134 134 130 128 115 Pakistan 134 133 132 132 127 126 112 Source: Global Gender Gap Index Report, 2012 Agency of women needs to have some strategic interventions as although there is shift towards representation of women in the form of women rising to high public offices, participating in legislature, heading ministries and having opportunities for higher education, but at the same time the overall situation of gender gaps and disparities is becoming more pronounced with such low ranking. 2.2 GENDER ANALYSIS IN CONTEXT OF BALUCHISTAN PROVINCE 2.2.1 Gender Analysis of Demographic characteristics Age and sex distribution According to recent household surveys10, Baluchistan has a very distinctive population distribution, as can be seen in the population pyramid below (Figure 1). The population is very young – the median age group is 10-14 years11, and less than one person in eight is older than 45 years of age. (The 2010-2011 Labor Force Survey found even fewer: less than one in 12.) This is reportedly even more marked among women aged 45 and above, who represent only about four percent of the total surveyed population. 12 The age distribution gives rise to high levels of dependency13: The 2007 Pakistan Demographic Survey (PDS) gives a rate of 107 dependents per 100 persons of working age (15-64), while the Labor Force Survey 2010-2011 gives an even higher rate: 119. However, a smaller proportion of the population aged less than five years suggests that there is a tendency towards reduced fertility14, which would lead to a change in the dependency ratios as the present generation of children move into working ages. 15 10 Pakistan Demographic Survey 2007 and Labor Force Survey 2010-2011 reflect very similar findings. The age and sex distribution reported in the 1998 Population Census gives a more “normal” population pyramid, in that it gradually reduces from the 0 -4 year old group towards older ages in relative even stages, but with fewer females than males in each age group – most markedly around the age of puberty. The MICS findings give a somewhat similar distribution to the Census data, but with a small base in the 0-4 age group and a “bulge” in the 50-54 age groups for women – explained by the researchers as possibly due to interviewer bias. (MICS Balochistan 2010), The MICS data suggest a larger proportion of older people: 14.7% aged 45 years of more (8.3% being men and 6.4% being women). It should also be noted that while the Pakistan Demographic Survey 2007 projections based on its findings indicate a 31.8% increase in population numbers, this is reflected in a much larger young population: they also indicate a marked drop in numbers in the older age groups. 11 The 1998 Census gives 46.7% of the population being aged less than 15, while the MICS 2010 found only 41.9% in this age group. 12 Information has not been found on life expectancy at birth rates specific to Balochistan, either generally or sex-specific. At national level, the State Bank of Pakistan cites 64.5 years for the country overall for 2010 (63.6 for males and 65.4 for females. State Bank of Pakistan (2010)’sHandbook of Statistics on Pakistan Economy, Chapter 11. 13 Dependency rates classify those aged less than 15 years and those aged 65 or more as dependents, compared to the population of working age – 15-64 years of age – irrespective of their current economic activity status. 14 Reflected to a greater or lesser extent in all the recent surveys 15 UNWOMAN Pakistan Gender Profile of Baluchistan 2013 Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [13/30] All surveys indicate high gender imbalance in the overall population, with sex ratios ranging from 1.10 males per female (2007 PDS) to 1.21 (2010 MICS Baluchistan). Under normal circumstances, overall sex ratios fall close to 1.0, and significant variation calls for closer attention as it usually indicates one or more problems occurring in the population. It is common to find sex ratios of up to 1.05 males per female at birth, but higher infant mortality among male infants16 usually brings the ratio down within the first year of life. However, the Sharp decreases of the male rural population 2007 PDS data indicate an overall sex ratio combined with higher sex ratios in the age groups of 1.02 for live births (1.06 in rural areas and between 15 and 29 suggest rural to urban only 0.87 in urban) in Baluchistan. Overall migration and some emigration from Baluchistan gender imbalance therefore develops at older for studies or work; a similar drop can be seen in ages – as can be seen in the population the 30-34 age group in urban areas, suggesting pyramid. migration outside Baluchistan .As a result, it is noticeable that there are more women than men The Baluchistan pyramid reflects excess recorded in the age groups 24-29 and 30-34 in females in the under 5 age group – a gender the rural population, giving rural sex ratios of imbalance that inverses in subsequent age around 0.8 men per woman in this age range. groups. Such an atypical distribution in the This has implications for the agricultural labor under-5 age group calls for attention, to force and planning for increasing agricultural identify causes and take steps to respond if productivity. there are factors contributing to sex-specific early deaths. The Baluchistan Multiple Indicator Cluster Survey (2010) findings did not identify such a pattern in its overall population pyramid, but gave rise to estimates of higher child mortality rates for girls than for boys both in the first year of life and for under-5 years, which would contribute to a higher sex ratio in the 5-9 age group. The MICS estimated a female Infant Mortality Rate of 82 per 1,000 female live births compared to 63 for male infant mortality, and an Under 5 The MICS estimated a female Infant Mortality Rate of 82 per Mortality Rate (deaths per 1,000 1,000 female live births compared to 63 for male infant children under age 5) of 107 for girls mortality, and an Under 5 Mortality Rate (deaths per 1,000 compared to 74 for boys. 17 The 2007 children under age 5) of 107 for girls compared.to 74 for boys PDS data also indicate higher sex specific Under 5 Mortality Rate, but with less gender difference: 179 for girls compared to 162 for boys. Underlying factors of overall gender imbalance can include current or past high mortality due to conflict (which usually causes excess numbers of women), high maternal mortality (causing excess numbers of men in older age groups), sex-specific migration, sex-specific infanticide (unlikely to be a cause in Baluchistan) and/or under-enumeration – usually of women and girls once they reach puberty, for cultural reasons. Variations in the patterns of gender balance between age groups can give pointers towards which factors are being reflected, and these may vary between rural and urban contexts. As Baluchistan’s population lives largely in rural areas – the 1998 Census found only 23.89% residing in urban areas - rural patterns may hide differences in urban communities. The rural population is clearly younger than the urban population, with a larger base to the pyramid, while the urban pyramid suggests greater reduced fertility rates in urban areas. While there is a surprising gender 16 As also found for Pakistan in the 2007 PDS, which reports a country level male IMR of 83.5 per 1,000 live births, compared to 66.2 for female infants; a similar gender gap is found in both urban and rural areas. (2007 PDS, page 30). Province-specific data are not included in the report. 17 UNICEF (2011 draft), MICS Balochistan, p xxiii, p16 Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [14/30] imbalance, with more females in the under 5 year old age group in both urban and rural populations, the LFS 2010-11 findings show this trend as stronger in rural areas, with a sex ratio of only 0.84 boys per girl for the age group as a whole, and 0.76 for infants (under 1 year). The balance inverses from age 5-9, reaching sex ratios of 1.42 males per female in rural areas and 1.20 in urban areas for the 15-19 age group and similar rates for the 20-24 age group, both of which are also marked by a sharp drop in the female population. In urban areas, data indicate the same gender imbalance also in the 25-29 age groups. Although 2007 PDS data indicate higher age-specific mortality for females than males in the 10-14 and 15- 19 age groups, and to a lesser extent in the 20-24 age group, more marked in the rural population, this is too great a difference to be explained entirely by high maternal mortality rates at these ages (recent figures for which have not been found). The level of gender imbalance suggests that other factors also intervene, such as under-enumeration of young women especially in rural areas, and/or high rates of emigration for marriage to men not only living in urban areas but also outside of Baluchistan 18. Sharp decreases of the male rural population combined with higher sex ratios in the age groups between 15 and 29 suggest rural to urban migration and some emigration from Baluchistan for studies or work; a similar drop can be seen in the 30-34 age groups in urban areas, suggesting migration outside Baluchistan As a result, it is noticeable that there are more women than men recorded in the age groups 24-29 and 30- 34 in the rural population, giving rural sex ratios of around 0.8 men per woman in this age range. This has implications for the agricultural labor force and planning for increasing agricultural productivity. A similar excess in numbers of urban females is recorded in the urban 30-34 age group, where a sex ratio of 0.77 urban men per woman is found. No sharp drop in the proportion of women in the age groups between 25 years and 39 years suggests that maternal mortality is not a major problem at present, although the shortfall in numbers of women in older age groups is probably at least in part due to high maternal mortality in the not so distant past. Sex ratios in the population aged 65 or more are strikingly high: 1.54 rural men per rural woman, and 1.79 urban men per urban women. In urban areas, this becomes even greater when looking at the population aged 70 or more: there are 2.09 men aged 70 or more for every woman in this group. Marital status Universal marriage is the norm in all the tribes that constitute the Baluchistan population. However, as can be clearly seen in Graph 3, which shows the proportion of specific age groups that were currently married at the time of the 2007 Pakistan Demographic Survey, there are marked differences rural-urban and gender differences in marriage status at different ages. Traditional child marriage for girls appears to have almost disappeared19, but 75% of rural women aged 20-24 and 96% aged 25-29 are currently married, with slightly lower rates (60% and 86%) among urban women in the same age groups. This reflects a trend towards later marriage among women. It can be seen that men marry later than women: the age-specific marriage rates for men lag 5 years behind those of women for these age groups, but by the 30-34 age group both gender and urban-rural differences have virtually vanished, Widowhood starts to have a visible impost on women’s currently married status, and slightly more in urban areas than rural, after age 40, but more than 90% of men in the older age groups are still currently married, irrespective of whether they live in urban or rural areas. 18 Labor Force Survey 2010-2011 (Table 10) 19 The 2007 PDS findings indicate that 0.12% of rural girls in Balochistan are married; no cases were found in urban areas. Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [15/30] The wide gender differences in age 100% specific currently married rates reflects 90% 80% the tendency of men to marry much 70% younger wives, who are then widowed in 60% 50% their 50s or earlier. It is common practice 40% in Baluchistan for widowed women to be 30% 20% integrated into the household of their 10% husband’s family or of one of their 0% 10 - 14 15 - 19 20 - 24 25 - 29 30 - 34 35 - 39 40 - 44 45 - 49 50 - 54 55 - 59 60 & above children. Urban currently married women Age Rural currently married women Urban currently married men Rural currently married men Divorce is extremely rare; 2007 PDS found less than 1% of men who were (currently) divorced and among women it Graph 4 Age specific marriage rates in urban and rural areas was statistically invisible. While the divorce rate might be a little higher for men were data available on “ever divorced”, this is unlikely to be true for women since remarriage after divorce is rarer for them. Birth and mortality According to the 2007 PDS data, Baluchistan has a crude birth rate (CBR) of 26.6 births per 1,000 populations, with a higher rate of 27.3 in rural areas while the urban CBR is 24.3. According to the same source, the General Fertility Rate is 133 live births per 1,000 women of reproductive age (15-49), with higher rates for the rural population than for the urban: 140 and 110 respectively. No information has been found on childbirth to girls less than 15 years of age, but the number must be very small since so few are reported to be married. Child-bearing appears to peak sharply in the 20-24 age group, with higher Marital Fertility Rates for rural women than urban – 336 compared to 312 births per 1,000 married women, then rates for both reduce sharply with each increased age group – but more so for urban women. Rates for married women in their 40s fall below 70 live births per 1,000 currently married women. Factors that might be contributing to these data from the 2007 PDS include under reporting concerning live births that were followed by infant mortality; cultural factors might also discourage mention of such events. In the absence of universal systematic reporting of births and deaths to a central registration system, the PDS depends on accuracy of household reporting of vital events. The birth of a child is an event greatly celebrated in the different tribes that constitute the people of Baluchistan – more particularly if the newborn is a boy, as he is seen as a future defender of the tribe. 20 For example, in most Brahvi tribes the father announces the birth of a boy by firing in the air. Then there is a celebration feast, for which sheep are sacrificed – two for a boy, one for a girl. However, in many tribes the birth of a girl goes relatively The wide gender differences in age specific currently married rates unmarked: “A daughter is seen as reflects the tendency of men to marry much younger wives, who are little more than a gift to one's then widowed in their 50s or earlier. It is common practice in neighbor.” 21 Baluchistan for widowed women to be integrated into the household of their husband’s family or of one of their children. The 2007 PDS report does not give details about Baluchistan infant mortality. The 2010 Baluchistan MICS reported an IMR of 72 infant deaths per 1,000 live births, which is slightly lower than the 2007 PDS national estimate of 75, but gender differences in rates cited in the MICS 20 http://www.balochistan.gov.pk/index.php?option=com_content&task=view&id=39&Itemid=69 21 http://www.everyculture.com/wc/Norway-to-Russia/Brahui.html; http://www.everyculture.com/wc/Norway-to-Russia/Baluchi.html Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [16/30] are considerably different from the national figures. The MICS found a female IMR of 82 per 1,000 live births compared to 66.2 for Pakistan as a whole, and a male IMR of 74 compared to 83 in the PDS national estimates – completely inversed gender differences. It also identified much higher rates, especially for Under 5 Mortality, in the 40% of poorest households, and on regional variation, with IMR for Makran found to be half of those in Kalat. An inexplicable finding of the MICS was that while rates were highest for mothers with no education, rates for mothers with middle level schooling were higher than for lesser educated mothers.22 This requires further study. While the PDS did not explore Under 5 Mortality Rates (U5MR), its data for Baluchistan indicate that 36% of all reported deaths occurred in the 0-4 age group (16.59% being of boys under 5 and 19.57% being of girls under 5 – significantly more female and more particularly rural female). The high proportion of deaths in early childhood can be seen clearly in Graph attached above , which shows the distribution of all deaths in Baluchistan during 2007, as reported in the 2007 PDS, disaggregated for sex and urban-rural residence. It must be noted, however, that death reporting may be inaccurate, not only in completeness but also due to uncertainty about actual age – especially for older people. This is visible in “age heaping” around age groups with a 0, increasingly with age. Specific data for maternal mortality have not been found 23; even the MICS only discusses the importance of skilled health care providers as a factor of reducing maternal mortality24. The 2007 PDS findings indicated no female deaths in the 30-39 age groups and minimum gender difference in deaths reported for the 20-24 and 25-29 age groups, suggesting no maternal mortality in these age groups which are the ages of peak total fertility reported. Some part of the much greater gender difference in mortality being reported in the 15-19 age groups might be attributable to maternity-related causes: adolescent child bearing is widely considered to comport higher health risks. The peak in the 40-45 female mortality may also reflect some maternal mortality combined with inaccurate age reporting. However, in general, it seems likely that for some reason, most maternal mortality cases are not being reported. There may be some cultural factor, not explained anywhere, that discourages discussion of such deaths. This merits further study, in order to ensure appropriate response to maternal health needs. Family size and household structures The concepts of household and family size can vary greatly. With strong patriarchal and tribal influences, it is not uncommon for households to consist of large extended or joint, families and clans. Furthermore, members of the family are perceived as part of the family household even when absent for prolonged periods. However, for purposes of administration and statistics, a household is usually considered to be a group that routinely eats together (shares a chula)25. Small households are very rare in Baluchistan, with households of three or less members constituting around 6% 26 of all households. According to the Household Integrated Economic Survey (HIES) 2010-11 data, such households are predominantly rural and are associated with higher consumption expenditure (wealth): 20% of the wealthiest quintile of households in rural areas live in units of two or less persons, while no households falling in the poorest quintiles in either rural or urban areas are composed of less than four members. All surveys report a median household size of 7 persons, although with varying distributions. For example, while both the HIES 2010-11 and the 2007 PDS found more larger households in urban than 22 The MICS report comments on regional variation also, with IMR for Makran found to be half of those in Kalat. The report does not include sex-disaggregation of data concerning other characteristics of mortality. (MICS Balochistan 2010, p 16) 23 A very recent draft Situation Analysis of Women and Children mentions the MMR in Balochistan as being shockingly high: 758 per 100,000 live births. These data appear to be from a 2006 demographic survey. The March 2010 Quarterly Newsletter of the National Institute of Population Studies (NIPS) cites an MMR of 765 based on detailed analysis of the same survey data. 24 MICS Balochistan 2010, p88 25 Differences occur in classification of persons temporarily residing elsewhere for long periods. PDS considers persons residing since 4 weeks or more as constituting part of the household; the Household Integrated Economic Survey considers “normal residency”, which would include persons absent for a number of months during work or study elsewhere. This could lead to double counting, since a person could consider his (or her) usual residence to be where the (extended) family lives, yet be counted as part of a household where currently living. Given the male dominance of emigration patterns, this could be a contributory factor of high sex ratios. 26 2007 PDS gives a total of 5.58%, while HIES 2010-11 gives a little more: 6.26%. Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [17/30] in rural areas, the PDS findings indicate over 5% more of rural households in both households of 8 persons and of 9 persons, and almost 4% more urban households of 10 or more, than reported by HIES. 27 According to 2007 PDS data, 27.5% of Baluchistan’s population lives in households composed of ten or more members. This is more marked in urban areas, where 36.25% of urban residents live in such households, compared to 24.87% of the rural population. PDS data on gender and age breakdown of households have not been found, but HIES 2010-11 gives information on average household composition in urban and rural areas. It found more adults – men and women – and more boys, but fewer girls in urban than in rural households. (See Graph 6) This might reflect additional members of the extended family being included in urban households for reasons of work and studies. HIES also provides information on the proportion of households that are employed and/or earning income: an average of around 1.6 persons per household, with minor variation between urban and rural areas. Almost all those reported as earners are male; information is not given as to age. Patriarchal tradition and culture automatically identify as head of the household a man, or a boy in the absence of an adult male. Strong family ties and tribal culture lead to widows usually being integrated into the larger household. It is therefore very rare that a woman is identified as household head in Baluchistan. Even if the husband is physically or mentally incompetent or resident elsewhere (for work or with a second family, for example) and his wife assume all the responsibility for heading the household, he will still be identified as the official head of the household. It is not surprising, then, if MICS Baluchistan (2010) found only 0.4% of households as female-headed. Other surveys do not clearly report on the proportion of households headed by women. HIES 2010-11 indicates that female household heads constitute 0.05% of all employed household members, while men constitute 55.78%: less than one per thousand. The survey report also identifies the proportion of earning and employed women who are household heads: constituting only 1.41% in urban areas and 1.12% in rural. It is worth noting that the earning rural female-headed households identified by HIES all fall in the poorest quintile, but in urban areas are found in the median and the wealthiest quintiles.28The concept of household head being male is closely linked to traditional and Muslim inheritance directives. Migration Migration for socio-economic purposes Excluding population movement of nomadic herdsmen, which is largely within what could be considered their home zone and is not included in migration data, only a very small proportion of the Baluchistan resident population is described as being migrants in 2010-201129. (Figures have not been found concerning Baluchistan population emigrating outside of Baluchistan – as mentioned earlier, there appears to be emigration especially of young men from Baluchistan.) The 2010-2011 Labor Force Survey gives some information on migrants in Baluchistan. These account for only around 0.4% of the total population of Pakistan. Women constitute 53.7% of the migrants in Baluchistan, and marriage constitutes the reason cited by 28.93% of migrants for their migration (including for 2.62% of male migrants). Migration because of marriage is cited equally for women from rural and from urban areas (13.29 and 13.02% respectively). Almost two thirds of the migrants are found in urban areas, with no gender difference in composition. Migration for a range of reasons related to work is a male characteristic, and is cited by more than two thirds of male migrants in urban areas, but less among rural migrants. Women migrants cite almost entirely family-related reasons: in addition to marriage (26.31%) they migrated, mainly to urban areas, with their husband (12.57%) or their parents (9.63%) – the latter reason accounting also for almost one in four male 27 This difference must be borne in mind when considering HIES information concerning proportions of economically active members of households. 28 HIES 2010-2011, Tables 1, 5, 6 and 13. NB – quintiles are based on consumption expenditure for Pakistan as a whole; a quintile does not necessarily indicate that 20% of households are found within each quintile. HOUSEHOLD INTEGRATED ECONOMIC SURVEY (HIES) 2010-11 p23-25 http://www.statpak.gov.pk/fbs/sites/default/files/pslm/publications/hies10_11/complete_report.pdf 29 Labor Force Survey 2010-2011 (Tables 10 and 12-4) Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [18/30] migrants. A small proportion of migrants (3.27%) are women having migrated with a son or daughter, almost entirely to urban areas. This reflects the cultural pattern of widows being integrated into extended family households rather than living alone. Migration for educational reasons is relatively limited – only cited by 2.67% of migrants, almost all in rural areas. Women account for only a fifth of these. It must be borne in mind that the LFS data do not show emigration from Baluchistan. It is very likely that a proportion of Baluchistan’s native population has emigrated, tempo rarily or for longer periods, to work or study either elsewhere in Pakistan or abroad. It is also likely that this emigrant population group is predominantly male and falls mainly between the ages of 15 and 34, although the population distribution suggests that there may be some women especially in the 20-24 age group, who have moved with an emigrant spouse or family members, and a few following studies outside Baluchistan . Migration related to crisis situations Waves of displaced persons create situations where health risks are greatly increased, impacting on mortality over and above direct impact of the crisis. It is usually the most vulnerable sectors of the population who are most affected, as they have few reserves and coping strategies to handle the impact of their displacement and their losses. Hosting communities also face great strain: in most crises a sizeable proportion of displaced persons turn to extended family and friends for shelter. There are many reports of increased Gender-Based Violence in the temporary settlements and among IDPs. Current estimates for Baluchistan IDPs – or “flood affectees” – for this year’s floods are around 390,000 persons, many of whom moved a short distance from their flooded homes and have started to return. The data from the multi-sector survey this year reflected average household characteristics quite different from the provincial average. Average household size was large – more than 11 persons compared to the 7 that is the mean size in Baluchistan, probably reflecting grouping of extended family members. Almost all households are officially male-headed. Female-headed households constituted 3.56% of the households interviewed, and a further 1.62% of households reported that the head was a man – but there was no adult male included in the description of those living in the household. In effect, the women in these households were effectively assuming the role of household head. The average size of female-headed households was smaller than that found in male-headed households. There were also almost 3% of households officially headed by a man in which no adults were reportedly living. Reports concerning the 2008 earthquake discuss the number of small children affected, but no sex- disaggregation of the resulting IDP has been found. As discussed earlier, Baluchistan has been hosting large numbers of Afghan refugees. Between 2002 and June 2010, more than 572 thousand Afghan registered refugees were assisted by UNHCR to return to their homes from Baluchistan. Furthermore, according to an ARO report, between January 2007 and 1 st January 2010 an additional 19,317 Afghans were deported from Afghanistan, and 10,796 were reported as having spontaneously returned to Afghanistan (i.e. returned with no formal process and without the aid to returnees)30. Over a third of those leaving in the second quarter of 2010 had been refugees for more than 30 years 31. UNHCR does not give Province-specific sex-disaggregated data concerning returnees, but among all those returning from Pakistan no significant overall gender difference was reported, although some variation was noted between the different ethnic groups. 3 Education 3.1 Provision of Education Services 30 ARO “District and Camp wise Population of Afghan Refugees POR Holders till 25 -07-2009” and “Months Wise Total Deportees/ Spontaneous Repatriation Of Afghan Refugees For The Period From 1st January 2007 To 1st January 2010’, http://www.balochistan.gov.pk/index.php?option=com_content&task=view&id=497&Itemid=852 31 http://www.unhcr.org.pk/publications/statistics/Repat%20Monthly%20Report%20June%202010.pdf Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [19/30] Education is both a key and a millstone to development in Baluchistan. Without an educational infrastructure that brings schools close to the people, lack of easy access to schooling becomes a barrier to progress. Yet even if the physical facilities of education are established close to homes, they only become valuable if they have the appropriate educated human resources to provide adequate teaching – and lack of schools has stifled the evolution of an educated cadre of local teachers. Availability of competent local teachers impacts on boys’ education, but even more on girls’ since culture and tradition demand that girls be taught by women, especially after they reach the age of puberty. A factor of equal importance is the attitude of the community towards education. The will of the population in a school catchment area to support not only school attendance (by boys and by girls) but also school management is critically important for ensuring that a school is more than just premises. Baluchistan faces particular challenges in this respect. As already discussed, it has a very young population, with one person in five in the population falling in the ages 5-9 when they should be enrolled in primary school, and a further one in six who should be enrolled in middle school. With the exception of a few urban areas, the population is relatively scattered, forcing a choice between investing in better equipped schools serving a greater number of students, at the cost of reducing accessibility due to distance, or establishing a greater number of schools close to the population, at a higher cost per school and per capita of students. Not only does distance raise the question of travel costs for students (both monetary and in terms of perceived opportunity costs but also, for cultural reasons, the greater the distance to travel to reach school, the less likely it is that girls will be allowed to go. Distance can also contribute to late enrolment, with consequent difficulties since curricula are designed to correspond to children’s development ages. The nomadic and semi-nomadic lifestyle of part of the rural population also compounds the challenges. Furthermore, other education than religious is not given high priority by a number of communities in Baluchistan, and rising religious extremism is reinforcing such attitudes. The difficulties that Baluchistan has faced in meeting these challenges are reflected in the education levels achieved by its population: literacy rates are very low. Pakistan Social and Living Standards Measurements (PSLM) Survey 2011-2011 cites an overall literacy rate of 37% for the population aged 15 and above, with a large gender gap. The literacy rate for men is estimated at 56%, while that of women is only 15%. The situation is less dire in urban areas, where 56% of the population is literate, than in rural populations, for whom the rate is 30%. However, the 2010-11 PSLM figures reflect a gender gap of 40 in both areas: 77% of urban men and 33% of urban women aged 15 or more are literate, while the respective figures for rural populations are 49% for men and only 9% for women. The cultural context also represents a constraint to bringing teachers from other parts of Pakistan that have excess numbers of teachers. Here also, the challenge applies to both male and female teachers from outside, both in terms of acceptability by local communities and in willingness to consider accepting to come and work in rural Baluchistan; it is more acute in connection with female teachers. Secondment of teachers to fill the resource gap is recognized to be problematic in Pakistan in general, with empty posts and unacceptable levels of teacher absenteeism often identified as common problems to which Baluchistan is far from immune. The Baluchistan Education Management Information System (BEMIS) schools census database for 2010-201132 shows problems with teachers as one of the most common primary reasons given for schools being classified as non-functional: more than a quarter of such schools cite reasons related to teachers’ availability and presence. 4 Economic participation and the labor force – critical considerations One of the major challenges in assessing economic participation is that of capturing real contributions of people to the economy. Employment usually is understood to refer to engagement in activities that bring in wages or income, or (if unemployed) the availability and active will to accept such employment. Economic activity in reality resembles an iceberg: not only is there a visible population currently earning income, 32 It should be borne in mind that the EMIS Annual Census of schools takes place in October each year, thus reflecting the situation at the start of the school year. Any events impacting on the population at this time of year, such as floods which are a seasonal risk more often impacting on the start of the school year – as in 2011 - may affect the overall picture for the year given by these censuses. Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [20/30] seeking work or undertaking unpaid (usually family) work, another part lies invisible under the surface because it represents a secondary level of participation. Such secondary participation may be seasonal, or may take up proportionately less time compared to a primary role/ activity, but nevertheless constitutes a real contribution to some level of the economy. In a context such as that of Baluchistan , people are often engaged in a range of activities; when asked in surveys to name their “main” activity, the response may refer to an activity that is classified under on e sector of the economy, while they are actually also engaged in other activities as well. For example, a family may have livestock (agriculture) and the men may transform animal hides into shoes while women transform the wool to weave carpets (industry). The (male) family head will be classified as engaged in agriculture, and also probably the sons who heard the animals providing they are not also going to school. Sometimes the “primary” activity given is one that is not directly identifiable as contribut ing to the economy – such as student, or housewife; the respondent is therefore usually classified as “out of the labor force”, “economically inactive”, although the same person may also spend several hours a day as unpaid family labor or working in someone else’s fields. Estimates of economic participation therefore vary according to how activities are classified, and what is taken as the population base. The Federal Bureau of Statistics calculates a “Civilian Labor Force rate” consisting of the currently economically active population (including unpaid labor and currently unemployed who are actively seeking work) as a percentage of the population aged 10 years or above. 33 The 2011 LFS results give a Baluchistan Civilian Labor Force participation rate as 39.83%, of which men constitute 35.71% and women 4.12%, with 19.48% of the male population and 40.69% of the female population considered as out of the labor force. The economically active population (“Civilian Labor Force”) is estimated to be constituted of 89.65% men (including 2.16% unemployed) and 10.35% women (including 0.84% unemployed). Despite the fact that education enrolment rates are relatively low in Baluchistan , reported child labor (aged less than 15) represents just under 10% of the population aged between 10 and 14 (11.45% of boys and 7.49% of girls in this age group are classified as participating in the labor force). For the rural population, the rate of inclusion in the Civilian Labor Force is 41.51%. Women constitute 4.71%, giving a gender composition of the rural economically active population as 88.64% male and 11.36% female, with relatively low unemployment within the rural labor force (1.73% male and 0.69% female). A third of the female unemployed population is very young – under 15 years of age, while more than two thirds of the unemployed men are aged between 15 and 24 years. In contrast, 65.22% of the urban population is outside the labor force (21.97% male and 43.25% female): this almost certainly is due at least in part to more young people continuing their studies in urban areas, but there are also gender differences. Women constitute only 6.73% of the urban economically active population, and while unemployment is higher for both men and women in the urban labor force (5.07%), it is disproportionally more so for women, with a fifth of urban economically active women looking for work compared to 4% for men. Two thirds of both male and female unemployed are young, less than 25 years old. However, this picture is not complete. The 2011 LFS also included probing questions to capture a fuller and more inclusive picture of the labor force. The questions are intended to identify men and women whose participation in the economic would normally be omitted in calculations, such as work in subsistence agriculture and construction of own homes. These data provide an “augmented” estimate of economic activity. The labor force and economic activity rates based on augmented figures thus give some idea of part of the population whose contribution is invisible in most discussion of economic activity. The LFS refers to such economic participation as “marginal”; in the following discussion it is referred to as “invisible”, since marginalization is more a function of its invisibility than of its value to the labor force and the economy. On the basis of the resulting adjusted figures (“augmented” labor force participation), the 2011 LFS reports an overall economic activity rate of 59.26%, of which men constitute 35.85% and women 23.41%. The 33 Crude economic activity rates are based on the total population, while the refined economic activity rates are based on the total population aged 10 years and above. FBS uses the refined rate to allow better international comparison, since it factors in the effect of the very young population structure and the sizeable proportion who are not expected to be economically active. Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [21/30] corresponding proportions of men and women who are outside the labor force in Baluchistan are 19.33% and 21.4% respectively - a much smaller gender gap than that found in the unadjusted rates. In fact, fewer women than men are outside the labor force within the rural population: only 16.41% of the rural population is women outside the labor force, while 18.47% are men. The rural population that is outside the labor force is predominantly young, of school age. Of the 34.87% of the population that is classified as out of the labor force, 22.33% are less than 15 years old, and 5.39% are in the 15-19 age group. Two thirds of the young economically inactive population is male. They account for almost all the rural males outside the labor force: less than 1% of the rural economically inactive population is men aged 20 years or more, and half of these are aged over 65 years – therefore classified as out of the labor force unless otherwise specified. Among rural females, the part of the population that is out of the labor force is spread across all age groups, although almost half are aged 10-14 years, and many of these may well also be in school. The LFS reports do not provide information on students within the out of labor force category. The large proportion of boys in the rural economically inactive population is a major factor of the higher proportion of males than females who are outside the rural labor force. The gender imbalance in the rural young population only partly explains the gender difference in the young population outside the labor force; a more significant factor is almost certainly the large gender gap in rural middle and secondary school enrolment. It is surprising that there is almost no invisible economic activity identified for boys in the 10-14 and 15-19 age groups, as one would expect to see some engagement of boys as well as girls outside of school hours, at least as unpaid family helpers if not as occasional/ seasonal paid workers in the rural economic context. The 2010-2011 LFS also provides augmented statistics concerning age and sex-specific unemployment – persons not currently participating in the labor force but who are actively seeking work - based on the probing questions used for estimating the “invisible” economic activity34. Rural unemployment is reportedly minimal, with 1.54% of the rural civilian labor force unemployed (1.1% being male and 0.44% being female). Young men aged between 15 and 29 constitute nine tenths of the rural male unemployed population and almost two thirds of all rural unemployed. Rural female unemployment is greatest at a younger age than that of rural males, with half the unemployed rural females being aged under 20, and two thirds of these being under age 15. It should also be noted that a fifth of rural men and one in four rural women aged 65 or more who are economically active are seeking work. The relatively low participation of women in the urban (visible and invisible) labor force is probably due to a combination of factors. Not least is the fact that in rural areas most members of the local population belong to the same community, and often have family ties, thereby being perceived as offering some level of guaranteed respect and protection for women who have work outside the house. In contrast, the urban population tends to be perceived as being composed of strangers, especially men, who cannot be counted on to treat women not of their family with due respect. Few work opportunities for women are seen as providing adequate protection, and most of these (such as the Civil Service, teaching or health care) require education levels that are lacking in the older female population. As a result, a large proportion of women in each age group is outside the labor force. In contrast, as in rural areas, almost all of the urban male population between the ages of 20 and 59 is economically active; the male population outside the labor force is predominantly young, with a small proportion of men in the oldest age groups who have probably retired or are considered as out of the labor force for reasons of age. In contrast to the rural population, almost all the 10-14 age group, irrespective of sex, and a sizeable proportion of the 15-19 age group are out of the labor force. This almost certainly reflects enrolment in school and higher education since access to schools is much greater for girls as well as boys in urban areas. However, it may also reflect impact of efforts to reduce child labor. Unemployment rates are higher in urban areas. It seems that the population aged between 20 and 24 is most vulnerable to unemployment: around four out of ten unemployed men fall in this age group, as in rural areas, and the same pattern is also found among urban unemployed women. However, urban women’s 34 LFS 2010-2011, Tables 6-4, 8-4, 14-4 and 15-4. See also Graph in Annex of additional graphs Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [22/30] unemployment is reflected more in most age groups, and women constitute more than two thirds of urban unemployed aged between 30 and 54. Although education is a critical key to employment, the official labor force participation rates concerning unemployment show that two thirds of unemployed men in both rural and urban areas, and more than half of urban unemployed women have at least their Matric. Furthermore, unemployed women with Matric or higher qualifications constitute a tenth of all women in the urban labor force. This reflects a gender barrier in employment, since the unemployment rate of urban men with similar education levels is proportionally much lower: only one economically active urban male in forty is highly educated but unemployed.35 Most of the 2010-2011 Labor Force Survey analysis and statistical tables reflect only the official labor force participation rather than the augmented rates of participation. As a result, there is inevitably some gender bias in the findings, due to the invisibility of much of women’s participation. I t would be valuable to undertake the analyses either of the augmented labor force as a whole or of the population identified as participating “marginally” to the labor force, in order better to understand where and how the invisible participation contributes to the economy. Agricultural Workforce A large proportion of the labor force engaged in agricultural work forms a particularly vulnerable group, especially in rural areas. Their vulnerability is increased by Baluchistan’s high vulnerability to natura l disasters and limited access to water. Many agricultural workers are unpaid family workers, while others receive in-kind benefits. As the LFS findings indicate, few receive wages. This group also includes tenant farmers36 and families who owe labor to land owners.37 Furthermore, many workers in agriculture are effectively invisible in statistics. Among the most invisible are female agricultural workers, but anecdotal evidence indicates presence of children (boys and girls) at levels beyond those suggested in the augmented labor force statistics. Agricultural workers seldom benefit from inclusion in any form of social security coverage and health insurance. Any health problems, including work-related injuries, have to be handled by the families and any resulting loss in earnings further increases the vulnerability of the family. In this context, it should be noted that according to the 2010-2011 Labor Force Survey38, amongst members of the Baluchistan labor force not currently available for work, illness is cited as the main reason for their unavailability to work. Around three quarters of unavailable men in both rural and urban areas, markedly less among women (68.18% in rural areas and 43.75% in urban areas) give illness as the reason for their current unavailability for work. These rates are higher for men, and lower for women, than the national averages. In contrast, the rate of occupational injuries and diseases reported by respondents is lower in Baluchistan than elsewhere in the country – less than one percent (all male) within the Baluchistan labor force, compared to 3.49 % in Pakistan as a whole. However, such low rates may well be due to under- reporting of injuries and health problems. Unless their employer provides some form of health benefits, employees may fear loss of work if they admit to injuries or health problems as long as they are able to work, while family workers may see no advantage to discussing such problems, and women workers’ health and injuries may be considered too personal a matter for discussion outside the immediate family – unless it is the reason for their not currently working. Informal sector workers tend to fall outside systems of labor-related social security. As mentioned earlier, they constitute a sizable proportion of the non-agricultural labor force as most private enterprises involve 35 Labor Force Survey 2010-2011, table 9-4 36 15% of farms in Balochistan are managed by tenant farmers, who often have an agreement whereby costs and share of profits are contractually agreed between tenant and land-owner. 37 A sub-group, reportedly in small numbers and clustered in a few specific localities adjoining the border with Sindh, is that of bonded labor – under which adults and children of both sexes are forced to work to land-owners under slave-like conditions. ILO (2004), “Bonded labor in agriculture: a rapid assessment in Sindh and Balochistan, Pakistan”, Working Paper 26 by Maliha H. Hussein, Abdul Razzaq Saleemi, Saira Malik, and Shazreh Hussain. P1 http://www.ilo.org/sapfl/Informationresources/ILOPublications/WCMS_082026/lang--en/index.htm 38 Labor Force Survey 2010-2011, Tables 28-30 Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [23/30] few workers39. The 2010-2011 LFS reports a high proportion to be self-employed, among male and even more among female informal sector workers, especially in rural areas. A number are engaged in work that carries some risk, such as mining and construction work (all male) and carpet weaving 40 (predominantly girls and women but also boys and men)-, without the security that formal sector employment is (in principle) obliged to provide. In rural areas, informal sector workers face particular difficulties in reaching job and produce markets due to the poor communications infrastructure in Baluchistan. The proportion of men reported in the informal sector is slightly higher than in the general labor force; almost half are in management positions – slightly more so in urban than rural areas. The rest are in a range of occupations, largely blue collar in rural areas but more in crafts and related trades in urban areas. Most male informal sector workers are in occupations that involve their being in public areas rather than home- based work. Women constitute only 3.18% of the visible informal Even the self-employed women are sector labor force, in which they are largely clustered largely dependent on others, in crafts and related trades, especially in rural areas – predominantly male family activities that tend to be home-based. However, it is members, to interact with markets, very likely that the proportion of rural women reported sell products and buy necessary as working in the informal sector labor force would supplies except where networks increase significantly were the activities of the with female fieldworkers are put in augmented labor force to be analyzed in relation to place to assist with marketing and occupations and main industry divisions. More than advice. half of the women identified as being in the informal sector are classified as “self -employed”, which would appear to support the inference that they are involved in home-based production work, which is also more culturally acceptable for women because it keeps them out of the public space. However, this also means that even the self-employed women are largely dependent on others, predominantly male family members, to interact with markets, sell products and buy necessary supplies except where networks with female fieldworkers are put in place to assist with marketing and advice. Migrant workers are another particularly vulnerable group, reportedly not of great size in Baluchistan: only 0.35% of Pakistan’s migrant workers are found in Baluchistan 41. The 2010-2011 LFS does not give details concerning in which sectors they work. In rural areas, close to two thirds are largely unpaid family workers (with little gender difference), while less than ten percent employees (all male) and one in four (all men) are self-employed. Their situation is very different in urban areas. Only 7.31% are unpaid workers, while 52.9% are employees and 39.79% are self-employed. Women constitute only 5.89 of migrant workers in urban areas, mainly as employees. In the Baluchistan context it seems likely that the rural migrant workers move as family units, while in most cases the urban migrants have probably left most of the family at home. The 2010-2011 HIES findings concerning household revenues would seem to support this: in urban areas remittances are shown as out-going (negative figures). Urban migrant workers in Baluchistan tend to work longer hours than the general labor force – most self employed and unpaid family workers work more than 49 hours per week, compared to around half of their counterparts in the urban labor force as a whole. A majority of urban migrant employees (male and female) work 42-48 hours per week, similar to the employees in the general urban labor force, while the self- employed migrant workers tend to work longer hours (a trend less marked in the general labor force). In 39 Labor Force Survey 2010-2011, Tables 21-23 40 Carpet weaving carries high risk of a range of health problems. These include respiratory, eyesight and dermatological problems, as well as nerve injury and musculoskeletal damage leading to deformities, especially when workers start at a young age. For women, this can result in difficulties with child-bearing; studies show high level of hysterectomies among female carpet weavers. K.A.Wani and Y. K. Jaiswal (2011), “Occupational health risk factors in carpet industries a review”, Asian Journal of Experimental Biological Sciences Vol 2 (1) 2011 pp135-139, http://www.ajebs.com/vol5/23.pdf 41 Labor Force Survey 2010-2011, Table 11 Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [24/30] contrast, rural migrant workers tend to work fewer hours than the general rural labor force; most unpaid workers report working 35-39 hours per week, similar to female rural workers in general. Afghan refugees form an additional vulnerable group in Baluchistan. They are reportedly criticized and resented by local populations for their willingness to accept low pay and hence keeping the wages depressed42. They are often engaged in street vending, but also as agricultural workers, for example in orchards, and it is estimated by some that male Afghan refugees constitute close to half of the miners in Baluchistan.43and need special protection and inclusion measures. Children are present in all of the groups mentioned above, despite efforts to combat child labor. Child labor is both a symptom and a cause of vulnerability, particularly when the children are fully engaged in the labor force, yet relatively little information is available concerning this group in Baluchistan. LFS only looks at children aged 10-14, and systematic studies on child labor have focused on a few specific industries in specific locations, few of which include locations in Baluchistan. According to the 2010-2011 LFS data, child labor is a greater problem in rural areas than in urban, with children aged 10-14 constituting more than eight percent of the rural labor force compared to 1.61% of the urban labor force (1.88% according to augmented labor force figures). Not only can child labor have an impact on children’s health and physical development, especially when they are engaged in more hazardous activities, participation in the labor force means absence from education, which has implications for the children’s future employment opportunities. Difficulties in access to schooling in rural areas are compounded by poverty and need for children’s economic contribution, and these impediments are aggravated by traditional attitudes that do not place high value on education which are even stronger concerning education of girls. As a result, as augmented labor force rates indicate, more girls than boys aged 10-14 are in the rural labor force. Little information is available on exactly what status these child laborers have and in which occupations they are engaged. Most of the girls are probably unpaid family laborers, engaged mainly in agriculture and craft work (including carpet weaving, which in addition to risks of causing respiratory skin and nerve damage can also cause muscular-skeletal injury that subsequently can affect their child-bearing capacity44). Boys probably work in a wider range of activities, since they face fewer restrictions to their mobility than do girls. For example, a study by a Quetta-based NGO, SEHER (Society for Empowering Human Resources), reports boys are working as cooks/assistants as well as underground in coal mines 45, despite Pakistan’s having ratified the ILO Convention on the Worst Form of Child Labor (N0.182), the UN Convention on the Rights of the Child and the ILO Minimum Age Convention (No.138). The same study flagged an additional risk faced by child laborers – boys as well as girls: that of being caught in trafficking and sexual exploitation, as flagged in a study of boys in coal mining in Baluchistan 46. SEHER estimated in 2011 that the labor force in Quetta city includes some 11,000 children, of whom 10,000 earn money by picking garbage; breakdown of these figures according to sex was not given. SEHER also reports almost 3,000 cases of child trafficking (of boys) along the border with Iran;47 5 GENDER ACTION PLAN Women’s participation in the utilization and management of water resources needs to be looked at in the broader context of the social construction of gender roles in Baluchistan, and their access to productive assets and resources. In the situation-specific context of Baluchistan with the gendered nature of relationships with water, soil, forests and other natural resources continues to change over time. Most 42 Pakistan Institute of Labor Education & Research PILER (2007), Denial and Discrimination Labor Rights in Pakistan, p63, http://www.piler.org.pk/laborestatusreport.pdf 43 Relief Web/UNHCR (2011), “For Afghan refugee miners, bright dreams beckon from the depths”, http://reliefweb.int/node/464948 44 K.A.Wani and Y. K. Jaiswal (2011), “Occupational health risk factors in carpet industries a review”, Asian Journal of Experimental Biological Sciences Vol 2 (1) 2011 pp135-139, http://www.ajebs.com/vol5/23.pdf 45 SEHER (Society for Empowering Human Resources) (2006), Report on Assessment of child protection issues at coal mines of Balochistan through Participatory approaches, http://seher.org.pk/SEHER-SC-Sweden Assessment of Child Protection Issues.pdf 46 Ibid 47 Shehzad Baloch (2011), “Role play: Students highlight issues of child abuse in Quetta” in the Tribune Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [25/30] importantly, it should be recognized that although globally women have often been disadvantaged and have lost rights and status as agricultural systems became increasingly technology-based and commercialized, there also have been instances where they have benefited from changes, sometimes as a result of their own negotiations to ensure that they received benefits or rights. Unfortunately, when gender is integrated into development projects, women frequently are seen as a “marginalized” or a disadvantaged group. This tends to reinforce the idea that women are victims rather than strong partners in development. Hence the proposed section will discuss the logics, assessments and considerations for the development of GAP, based on an understanding of the local conditions and norms to make it feasible, more pragmatic and viable. It discusses various approaches adopted for the structuring of the GAP and defines its activities under various phases of the project. 5.1 DEVELOPMENT OF THE GENDER ACTION PLAN With the detailed analysis of the gender inequities at multiple levels across sectors the attached Gender Action Plan has been designed to mitigate the risks and ensure greater participation of women in the project. Most development interventions in agriculture and livestock sectors have been designed to meet only the needs of men. Gender sensitive development approaches are now being introduced to look at the impact of development on both men and women and to tailor interventions to ensure more equity in the roles and responsibilities of both. Change is possible, notwithstanding the cultural and social fabric of the province. The Gender Action Plan (GAP) below has been developed to ensure that women benefit from all project activities and equitably participate in decision-making. Objectives of GAP are initially to raise awareness about women importance, their rights and gender sensitization amongst all relevant project stakeholders. To improve women’s situation in the area, the project has to work with men and approach women through men as the primary channel. Another important entry point to involve women is children. Through benefits of services to children like schooling and curriculum, women can also be reached. However, this will also be initiated with the support of men. At present, it is too early a stage for direct participation of women in the project design, planning and implementation phases. GAP includes the mechanisms to raise the educational, health standards of women and children, and their access to project benefits. However, all activities and interventions will be a process and a specified time frame cannot be defined at the planning stage. Gender Action Plan for DHP is therefore developed in the context of the existing situation to make it viable. It adopts a more realistic approach to the existing socio-cultural and tribal society conditions. It is prepared in the light of the local conditions and differs from the standard conventional GAP. It is a process action plan and has both short term and long term objectives. 5.2 ACTIONS UNDER GAP With certain approaches for developing Gender Action Plan, a number of actions are to be taken under GAP with “targets” as starting points to develop a favorable environment by involving men, particularly the local influential persons in the process of sensitization and awareness building to make project benefits accessible to women. These actions are expected to bring changes in the mindset of the local leaders, and with the benefits of the project flowing into the community, there would be further pro-women and positive development in the project area. All the proposed activities of the program will have gender as a cross cutting theme. Majority of the activities will have defined minimum quotas for participation of women to ensure their inclusion and engagement in the Project. 5.2.1 Ensuring Outreach to Women through participation and representation Activity # 1: On farm Water Management Demos (USD 2.0 Million) 1. Training needs assessments of farmers and staff  TNA will be gender sensitive and will have representation and participation of female staff and farmers Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [26/30] 2. Curriculum development (training modules and handouts)  Training modules will be gender sensitive and will incorporate the various issues that lead to gender stereotypes and inequitable access to allocation of resources 3. 10 days TOT workshops repeated 5 times each times for 25-30 project staff and educated farmers to train in water harvesting, management, conservation and efficient use including irrigation scheduling techniques held in country’s Agriculture R&D Institutions and Agriculture Universities  Inclusion of at least 40 percent female project staff and female farmers to train in water harvesting, management, conservation and efficient in use irrigation scheduling techniques. 4. 30 (1 to 5 ha.) demos on improved surface irrigation practices (furrows, basin and beds) with plantations (fruit and vegetables) continued for 3 years 5. 30 (1 to 2 ha.) demos for farmers on high efficiency irrigation system (drip and bubbler) with solar pumping unit (extendable to 04 ha.)continued for 3 years 6. 30 (1 ha.) demos for farmers on moisture conservation, assessments techniques and irrigation scheduling continued for 3 years 7. 4 field days per year on each of the above demo sites for up 50 farmers conducted by the TOT trained staff 8. 02 Days training in WRM for 25-30 Farmers and such training repeated at 30 locations including use of gadgets like moisture meters etc. 9. Human resource required for the activity: for each field day we need 3 staff days. For each demo we need 12 staff days per year. For 90 demos we1080 days per year. For 3 years 3240 days. A staff has 120 days per year available. We need 9 staff to do this work. For2 days farmers training 120 days of TOT trained staff)  Inclusion of at least 30 percent female farmers in the above mentioned training and capacity building activities.  Monitoring reports to capture the qualitative evidence and the quantities indicators to provide the full narrative of the benefits trickle down Activity # 2: Farmer Field Schools – 400 Nos. (@25% of project beneficiaries) $ 3 million 1. Target Crops  Nari – Almonds, pomegranates, olives, apricot, cabbage , cauliflower, chili, carrot, cucumbers , wheat, lentil, cotton, fodders  Porali – Banana, Chico, olives, grapes, dates, cotton, onion, tomato, okra, Fodders , Wheat 2. Training Needs Assessments of staff and farmers  TNA will be gender sensitive and will have representation and participation of female staff and farmers addressing the needs of women and men 3. Demo plots size (1 to 2 acres) crops 4. Curriculum development (handouts/training modules) – for the focused themes 1. Land preparation 2. Nutrition management Farm yard manure 3. Integrated pest management including NEFR 4. Water management 5. Post-harvest management and marketing management  Gender sensitive curricula can ensure that sectors where women are underrepresented are highlighted and their engagement is increased through affirmative action. 5. Registration of FFS farmers under Blue Number(optional) 6. Package per demo (seeds, saplings, fertilizers, pesticides, protective gears, packaging material, knapsack sprayers, tools and equipment etc.) 7. Training material, training venue and support cost (food, logistics) 8. Training of master trainers (male female) (10 days for 10 crops) and field facilitators (male female) (10 days for 10 crops)  At least 40 percent quota for female farmers as master trainers and field facilitators Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [27/30] 9. Human resource (250 Field facilitators, 30 master trainers, 10 resources persons, program manager, 10 field coordinators) with 20% as woman Activity# 3: Matching Grant support (USD 10.00 Million) max. Grant ceiling 10,000 USD Note: 25% of grant quota at 75% subsidy only for woman the rest at 50% subsidy open for men and woman. Each grant accounts for free training to grant recipient, when needed. 1. Farm machinery (PLL, rotavator, bed planters, disc harrow, pulping equipment, power sprayers, wool shearing machine, milking machines etc.) 2. Model orchards 3. Land leveling and land development 4. Quality seeds and saplings 5. Nursery enterprise establishment (vegetables and fruits) 6. Harvesting and post-harvest technology (chemicals, packaging materials, solar dryers etc. 7. High efficiency irrigation system 8. Tunnel farming 9. Fish, Goat, Back-yard poultry and Honey bee farming 10. Home grain storage 11. Breeding animals (bulls, bucks, ram etc.) Activity# 4: Exposure Visits (USD 1.00 Million) 1. Farmers and private sector (in country) 2000 farmers  At least 20 percent quota for female farmers and private sector 2. Government staff (in country and abroad) 100 staff  Female Govt. staff to be given preference for exposure visits to encourage them 3. Human resource to organize this e.g. exposure visit coordinator. Activity# 5Gender awareness and capacity amongst the government officers, staff, project teams and men ($0.5 Million) 1. Gender sensitization training using Gender Responsive materials to sensitize the government officers and staff about gender related issues 2. At least 30 percent female staff participation in training for PMU professional staff 3. GAP and M&E Training for all the PMU staff and concerned officers on tools including sex disaggregated monitoring data and reporting systems for GAP activities 4. Regular reporting on GAP Activity# 6: Women Agriculture and livestock (USD 1.0 Million) 1. 100 Kitchen gardening demos including equipment and inputs for 2 years participated by 20-30 farmers. Plot size 1/2 acre (provided by farmers or leased by the project) showcasing options for HHs to cultivate in their own kitchen gardens. 2. 100 Backyard poultry demos including birds, feed, vaccination, housing, equipment’s participated by 20-30 farmers. These women can apply for matching grants to establish their own enterprise. 3. 100 livestock (milk and meat animals) demos including cost for vaccination, de-worming, feed, water troughs, milking utensils participated by 20-30 farmers. Livestock provided by farmers. 4. Training of master trainers and field facilitators in kitchen garden, poultry and livestock demo management.  All the above mentioned activities are focused on women and engage men in the process. These activities are also designed with the objective of provision of entrepreneurship opportunities to women to increase their access to resources.  Inclusion of minority groups and vulnerable populations including immigrants, disable population segments etc. needs to be taken into consideration. 5.3 RISKS AND ASSUMPTIONS Over the past decade and longer, most bilateral and multilateral donors have publicly emphasized the need to integrate gender analysis into their programming. As already noted, the extent to which this actually occurs is questionable]. One reason for this lack of congruence between stated intentions and actual practice is that water-related projects usually have strong technical components and are implemented by Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [28/30] engineers who rarely have requisite skills and training to integrate gender concerns (van Koppen 2002; Zwarteveen 1998; Rathgeber 1996).One of the major risk can be the lack of expertise , gender sensitization with the project staff and the government departments is often not taken seriously or lack of capacity to implement gender; other factors can include (ii) Existing resistance due to the gender stereotypes in the society and (iii) information about the project benefits not imparted to the desired levels. Amongst the major challenges that can be faced during the planning and implementation of the Gender Action Plan there can be social structural constraints. Due to existing gender stereotypes and limitations of women’s mobility and access to resources and decision making a pragmatic and strategic action plan is proposed. This GAP, therefore, has taken a very practical approach to improving the overall environment and the context through engagement of women, their representation in the design of the program and their capacity building. The income generation activities proposed in the program will then gradually lead to their access to financial resources thus creating their space for decision making and greater participation. All investments in the action plan will have long term impacts and contribute to improving the status of women in the project area. The GAP has been designed carefully to provide benefits to the women and children and bring changes in their lives and socioeconomic conditions. It will be a gradual process but will surely benefit the target population. The patriarchal mindset and tribal set up may take time and efforts to change and therefore there is a risk that the processes may therefore take longer to implement. At the same time with the increased level of interaction of community leaders with project staff and other relevant people and exposure, project benefits, compensations, and sensitization efforts by the project, may bring positive impacts and changes in the social life within the community. 5.4 MONITORING AND EVALUATION Monitoring and evaluation (M&E) will be essential to objectively establish progress with regard to the achievement of the objectives of this Gender Action Plan and in tracking the performance of the action plan. The key aspects of the M&E framework for this action plan include: a) Monitoring of the communication activities as they happen; b) Assessing the outcomes and impact of the actions at regular intervals; 5.4.1 Monitoring of the Action Plan Monitoring of the performance of this GAP will involve tracking and assessing the specific action proposed and approved. 5.4.2 Assessing the outcomes and Impact of Activities Based on gender sensitive indicators the Gender Action Plan (GAP) will provide a road map for the project teams to monitor the project and achieve gender based results. Hence the overall outcome indicators will form the basis for assessing the interim and long‐term results of gender development through this GAP. This level of assessment would regularly be conducted internally by a third party. The key methodology for assessing outcomes will be stakeholder surveys such as periodical surveys to assess changes in knowledge, attitudes and behaviours, and also social and income status. All monitoring data will be disaggregated by sex and age groups, where possible. The external or independent third party monitor will also review the progress and evaluate the outcome of GAP interventions. A list of monitoring indicators, frequency of monitoring and documentations is presented in the table below: Monitoring Indicators Indicator Documentation Number (%) of female farmers trained by the Progress Report (MPR) program Number(%) of female master trainers trained MPR and External Monitor’s by the program Report Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [29/30] Gender Sensitive Training Need Assessment Progress Report (MPR) completed Gender Sensitive Modules for Training of the MPR and External Monitor’s male and female farmers Report Number(%)of female Govt. staff who MPR and External Monitor attended the exposure visits (EM) Report Number(%) of kitchen gardens demos MPR and External Monitor completed by female farmers (EM) Report Number(%) of poultry demos participated be MPR and External Monitor (EM) females Report Number(%) of women applied for grants for MPR and External Monitor (EM) enterprises Report Number and type of specific training program MPR by PRO and verified by offered to provide project relevant skills to EM Report men and women from the community. Number(%) of female farmers attending MPR and External Monitor (EM) livestock demos Report Number(%) of women receiving grant subsidy MPR and External Monitor (EM) Report Number (%) of female master trainers and MPR and External Monitor (EM) field facilitators in kitchen garden, poultry and Report livestock demo management. 5.4.3 Monitoring Reports Gender-disaggregated information including sex desegregated data where possible will be documented and will specifically analyze impacts on men and women separately, with comparisons, including such areas as participation, income earning, access to project benefits, negative impacts, migration, education, health, and public opinion. Monthly and quarterly project reports will also include progress reports on GAP implementation. The external monitor will review and verify the progress made and ascertain whether GAP goals and objectives have been achieved. The reports will include suitable recommendations for improvement. Monitoring reports will be submitted at regular intervals as specified. The M&E documents will also be publicly available, including posting in project websites. 5.4.4 Evaluation Third Party Evaluation will be planned in the project cycle related to various project activities and their time frame will be designed according to the plan of each action/ activity related to each objective. Evaluation Reports and recommendations will be utilized in the project cycle for improvements and addressing areas of concern. The report will be available to all stakeholders and posted in Project website. 5.5 BUDGET, IMPLEMENTATION & MONITORING MECHANISM FOR THE GENDER ACTION PLAN The Project Management Unit (PMU) will be responsible for the overall implementation of the project and a gender officer will be appointed within the PMU. She/he will be responsible for ensuring that GAP activities are on track and will be responsible for the implementation and monitoring of the GAP in coordination with the project management team. Through regular updating and bi annual submission of GAP progress reports it will be ensured that all the project gender related milestones are met. A gender specialist will be hired and She/he will be responsible for monitoring and reporting of GAP implementation in close coordination with the gender officer of the PMU, as well as responsible for gender awareness training and ensuring that GAP implementation is on track and sex disaggregated data will be included in project Social Impacts Assessment & Management Plan for Balochistan Integrated Water Resources Management and Development Project (BIWRMDP) Annexure-H [30/30] progress reports. The indicative budget for the gender mainstreaming activities is $1.00 Million, all the other activities will have gender as the cross cutting hence the budget for the activities will be allocated for the gender mainstreaming related activities mentioned in the GAP. 