International Bank for Reconstruction and Development International Development Association SecM92-10 FROM: Deputy Secretary January 2, 1992 MONTHLY OPERATIONAL SUMMARY OF BANK AND IDA PROPOSED PROJECTS (As of December 15, 1991) - 1. Attached is the Monthly Operational Summary of Bank and IDA Proposed Projects as of December 15, 1991. 2. On December 1, 1991, the Bank's organizational structure changed from four regions to six. In order to incorporate these changes in the Monthly Operational Summary, the next edition will be issued on March 2, 1992. Distribution: Executive Directors and Alternates Office of the President Executive Vice Presidents, IFC and MIGA Vice Presidents, Bank, IFC and MIGA Directors and Department Heads Bank, IFC and MIGA \-!-1,―·,기 TABLE OF CONTENTS Summary of Bank and IDA Proposed Projects Information on Environmental Assessment v SECTION REGION PAGES I. AFRICA I - 38 Angola ................................... 1 Benin .................................... 2 Benin/Togo ............................... 3 Burkina Faso .............................. 3 Burundi .................................. 4 Cameroon ................................. 5 Cape Verde ............................... 7 Central African Republic ................. 7 Chad ..................................... 8 Cokoros .................................. 9 Cote d'Ivoire ............................ 10 Djibouti ................................. 11 Equatorial Guinea ........................ 11 Ethiopia ................................. 12 Gabon .................................... 13 The Gambia ............................... 13 Ghana .................................... 14 Guinea ................................... 15 Guinea-Bissau ............................ 16 Kenya .................................... 17 Lesotho .................................. 18 Madagascar ............................... 18 Malawi .................................... 20 Mali ..................................... 21 Mauritania ............................... 22 Mauritius ................................ 23 Mozambique ............................... 23 Niger .................................... 25 Nigeria .................................. 26 Rwanda ................................... 29 Sao Tome and Principe .................... 29 Senegal ................................... 30 Seychelles ............................... 32 III. EUROPE, MIDDLE EAST AND NORTH AFRICA 81 - 103 Algeria.................................. 81 Bulgaria................................. 83 Czechoslovakia........................... 84 Egypt, Arab Republic of.................. 85 Hungary.................................. 88 Jordan ................................... 89 Morocco.................................. 89 Pakistan................................. 92 Poland................................... 96 Romania.................................. 97 Tunisia .................................. 97 Turkey................................... 100 Yemen, Republic of....................... 102 Yugoslavia............................... 103 IV. LATIN AMERICA AND CARIBBEAN 104 - 127 Argentina................................ 104 Barbados................................. 105 Belize................................... 106 Bolivia.................................. 106 Brazil................................... 108 Caribbean Region......................... 112 Chile.................................... 112 Colombia.................. .............. 113 Costa Rica ............................... 115 Dominican Republic....................... 116 Ecuador.................................. 117 El Salvador.............................. 117 Guatemala................................ 118 Guyana................................... 118 Haiti.................................... 118 Honduras................................. 120 Jamaica.................................. 120 -iv - LATIN AMERICA AND CARIBBEAN REGION (Contd.../...) Mexico................................... 121 Panama................................... 123 Paraguay................................. 123 Peru.......... 124 Trinidad & Tobago........................ 125 Uruguay.................................. 125 Venezuela................................ 126 V. NEW PROJECTS ADDED IN THIS ISSUE 128 - 130 VI. PROJECTS DROPPED FROM LENDING PROGRAM 131 - 133 AND PROJECTS SIGNED MOS ANNEX I Environmental Overview of Category A Projects II - 170 Environmental Overview of Category B Projects 177 - 1122 MOS ANNEX II Global Environment Facility - Quarterly Report III - 113 on Investment Projects Secretary's Department INFORMATION ABOUT THE ENVIRONMENTAL ASSESSMENT PROCESS APPLIED TO BANK AND IDA PROPOSED PROJECTS In September, 1989, the Bank established specific policies and procedures for environmental assessment and related environmental analyses of IBRD and IDA investment lending operations. Under this environmental assessment process, the type, timing and main issues of environmental analysis to be performed by the borrower are to be confirmed at the time that a given lending operation is initiated into the Bank's prospective lending program and thereafter reported and updated in the Monthly Operational Summary. In October, 1991, the Bank revised its policies and procedures so that projects are now assigned one of the following categories based upon the nature, magnitude, and sensitivity of environmental issues: Category A - Environmental Assessment is normally required as the project may have adverse and significant environmental impacts. Category B - More limited environmental analysis is appropriate, as the project may have specific environmental impacts. Category C - Environmental analysis is normally unnecessary. (The former Category D, used for identifying environmental projects, is now being phased out ) Accordingly, the Monthly Operational Summary now includes in Annex I more detailed information about the status of the environmental assessment of Category A and B projects included in the main text. Annex I is included in the Monthly Operational Summary on a quarterly basis (i.e. issues dated January, April, July and October). -1- Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender ' Project Consulting Services Action on Procurement 4 I. AFRICA REGION ANGOLA Lobito Corridor 25.0 (R) Lobito Corridor - Rehabilitation of Contract signed for Pre-appraisal mission Authority (LCA) (IDA) Lobito Port Transport System, which consultancy services for scheduled for April 1992. includes Lobito Port and the Benguela feasibility study, Railways. Environmental Assessment approximately Category B. 60 man-months. Ministry of Health 20.0 First Health - Restoration and Consulting services will Project preparation under (IDA) strengthening of the functioning of be required. way. Mission is in the essential health services and of field to follow up on associated training, management and preparation. support systems. Environmental Assessment Category C. Central 10.1 (R) Financial Institutions Development/ Consulting services Project under Bank/Ministry of (IDA) Private Sector - Technical assistance vill be required. preparation. Planning and training in support of establishment An IDA PPF advance of of two-tier banking system and private US$900,000 to finance sector development. Environmental equipment, vehicles, Assessment Category: To Be Determined. training and consultants will be requested. Ministry of About Education I - Rehabilitation and Consultants will be Project under Education 20.0 construction of schools and improvement required. preparation. Appraisal (IDA) of conditions of teaching; institutional mission in the field. development of various units within the Ministry of Education and university's management information system; and human resource development through initial and in-service training of teachers, inspectors and administrators. Environmental Assessment Category C. Planning Office of About (R) Lobito Benguela Urban Environmental Consultants will be Board presentation the Province of 45.6 Rehabilitation - Control and reversal of required for supervision scheduled for January 7, Benguela (IDA) environmental degradation; and of civil works and for 1992. rehabilitation and extension of urban technical assistance. services and infrastructure networks in Lobito-Benguela to respond to deferred maintenance plus increased migration to urban centers. Environmental Assessment Category D. 1/ Addresses of Implementing Agencies of new projects are given in Section V of the Summary. 3/ The amount is in millions of US dollars and is approximate and tentative. SAF is the acronym for the Special Facility of Sub-Saharan Africa. 3/ The letter (N) before projects means that the project is a new listing in the summary the letter (R) means the information about the project has been revised since the last issue. A/ This column contains available information, if any about action with respect to the procurement of goods and services expected to be financed by the Bank or IDA, including retroactive financing expenditures under the IBRD/IDA Project. -2- Member Country, Amount & Implementing Probable Stage of Processing at Agency ' Lender * Project ' Consulting Services Action on Procurement Ministers de 16.0 (N) Private Sector Development - The To be determined. Identification mission L'Industrie (IDA) project will take advantage of the returned on December 3 improved medium-term prospects resulting 1991. from the adjustment program by: (a) reform of the incentive framework; (b) further streamlining of business regulations; (c) strengthening of the institutional support to firms; and (d) further improvement in the banking environment. Environmental Assessment Category C. Ministry of Plan 10.0 Economic Management Support - Project To be determined. Pre-appraisal mission and Economic (IDA) would finance technical assistance for scheduled for mid- Restructuring economic management, supporting February 1992. institutional strengthening of the Ministries of Plan and Economic Restructuring and Labor and Social Affairs, with a view towards better monitoring of social indicators and the incorporation of the latter into the design and assessment of economic policies. Environmental Assessment Category: To Be Determined. Ministere du 14.3 (R) Management of Natural Resources - Consultants needed for Negotiations scheduleq Developpement (IDA) Protecting, managing and developing preparation of natural for December 16, 1991 Rural natural resources with emphasis on resources management forests and watersheds. Development of plans (forest, water, legislation with particular emphasis on land, wildlife), and an adequate land tenure system. training. Environmental Assessment Category D. Ministry of 20.0 (R) Education Sector Adjustment - To Consultants being used Project under National Education (IDA) support the Government's policy and in development of preparation. reform program for expanding primary program budget. A PPF request of education and improving the quality and US$380,000 has been relevance of educational services approved. through the implementation of a set of institutional and structural measures for: program development and management financial resource management including improved allocation and mobilization of resources, general sector reorganization and decentralizations personnel managementi- management of student flow through the system, and management of the production and delivery of cost-effective inputs (textbooks and in-service training and supervision of teachers). Environmental Assessment Catesory C. Agetur & Serhau 22.84 (R) Urban Rehabilitation and Management Consulting services will Negotiations complete (IDA) - Core of project will be a labor-based be required for detailed Board presentation program of public works improving engineering studies for scheduled for sanitation and living conditions in urban roads and drainage February 18, 1992. Cotonou and Porto-Novo to fight against rehabilitation and urban under-employment and alleviate preparation of bidding poverty. Also includes preparation for documents. reorganization of urban management services, land management, and resource mobilization in Cotonou and Porto-Novo. Environmental Assessment Catemory B. -3- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project s Consulting Services Action on Procurement 4 BENIN/TOGO Communaute 48.0 (R) Adjarala Hydroelectric - A Consultants have Project has been placed Electrique du (IDA) hydroelectric plant (80 MW, 250 GWh) completed the in the FY94 Lending Benin - 97 km downstream of Nangbeto on the Mono feasibility study and Program. Further River, including dam, powerhouse, are preparing bidding reporting will be related transmission lines documents. discontinued. (about 130 kms), resettlement and environment, administration and technical assistance. This is a joint Togo/Benin development project to be owned and operated by CEB.. Environmental assessment is under way. Ma1or environmental issues include: population resettlement and compensation; environmental protection health protection and downstream hydrology. A preliminary environmental evaluation has been completed. Environmental Assessment Category A. BURKIRA FASO Ministries of 10.0. (R) Public Institutional Development - Consulting services will Appraisal report under Finance and Plan (IDA) Increase public administration, be required. preparation. efficiency and accountability through: (a) strengthen-ing budget preparation and implementa-tion and civil service reforms; (b) reforms to commercial laws and training of legal staff; and (c) streng-thening public accounting and procure-ment all through process reform, technical assistance and training. Environmental Assessment Category C. Ministry of 35.0 (R) Private Sector Development - The Consultants will be Project under Economic Promotion (IDA) project would include various technical required. preparation. assistance components. Environmental Assessment Category C. Ministere de 28.0 (R) Agricultural SECAL - Policy reforms Consultants will be Appraisal report under l'Agriculture et (IDA) in the cotton, cereals, livestock and required (estimated at preparation. de l'Elevage horticulture subsectors, including 200 staffweeks). (Possibility of co- pricing, restructuring of stabilization financing with FAC, CCCE mechanisms, marketing regulations and (France), and FED boards. Substantial reforms to improve (European Economic public sector efficiency and possibly Community). some investments. Total project cost estimated at US$70.0 million. Environmental Assessment Category C. Ministere de 66.0 (R) Transport SECAL - This five-year Consultants have Board presentation l'Equipment/ (IDA) program will assist Government in: prepared feasibility scheduled for February Ministere des (a) developing a coherent policy studies. Findings were 1992. Transports framework for the transport sectorl and presented and discussed (Co-financing from EEC, (b) meeting urgent rehabilitation during seminar for ADB, WADB, FAC/CCCE, requirements of the existing road and Ministry personnel in CIDA, BMZ, and UNDP.) rail network, and assisting in March. restructing the local bus company, railway company and air carriers. Total project cost estimated at US$453.0 million. Environmental Assessment Catemory B. -4- Member Country, Amount & Implementing Probable Stage of Processing a Agency Lender Project 3 Consulting Services Action on Procurement BURKINA FASO (Cont'd) Ministere de Ia 35.0 Population/Health - Strengthening health Consultants will be Project being identif! Sante (IDA) sector management, extension of required. population/family planning/nutrition activities begun under first project, programs to improve women's conditions. Environmental Assessment Category C. BURUNDI Ministry of Land 40.0 Natural Resource Management and To be determined. Project under Planning, Tourism (IDA) Environment - Implementation of preparation. & Environment environmental action plan. Project would focus on: (a) development of soil conservation, agro-forestry, reforestation; (b) rehabilitation of plain irrigation schemes; (c) improvement of land security in priority zones; (d) development of environmental research; and (e) improvement of local and central institutions. Environmental Assessment Category B. Central Bank, About Private Sector Development and Export Consulting services will Negotiations tentativ Ministry of 25.0 Promotion - Will provide funds to be required. scheduled for Februar Commerce & (IDA) finance: (a) private investments 1992. Industry (MCI), through eligible financial Ministry of Public intermediaries via BRB as APEX Works and Urban institution, with particular emphasis on Development export-oriented projects; (b) public (MTPDU), Bank of investment in industrial sites and the Republic of services through MTPDU; and (c) a multi- Burundi (BRB, faceted technical assistance to MCI Central Bank) private entrepreneurs, BRB and banks. Environmental Assessment Category C. Ministry of About Agro-Industrial Sector Adjustment - Technical assistance Appraisal postponed 1 Agriculture & 26.8 (a) Promotion of private sector will be required for January 1992. Livestock; (IDA) involvement and import substitution product organization Ministry of (b) Promotion of export diversification; commodity groups, Commerce & and (c) Capacity building of GOB and exporters in market Industry Chamber of Commerce in support services analysis, storage, to private exporters. Environmental packaging, grading, Assessment Category C. setting of quality standards, advertising, quality control, and financing techniques (leasing). Ministry of Health About HealthlPopulation II - Sectoral To be determined. Project under 32.5 development and continuing support to preparation. (IDA) ongoing priority programs. Environmental Assessment Category C. -5- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project s Consulting Services Action on Procurement 4 BURUNDI (Cont'd) Ministry of Plan About Social Action - To be carried out in Consultancy will be Project under 20.7 conjunction with SAL III, is designed to required. preparation. (IDA) address social dimensions of adjustment including specific activities focussing on vulnerable groups, such as women, redeployment, community development, essential drug supply, and nutritional surveillance. A Social Dimensions of Adjustment survey will be implemented. Technical assistance and training will be provided. Environmental Assessment Category C. Ministry of Plan; 30.0 (R) SAL III - Continued support to Consultants will be Post appraisal mission Ministry of (IDA) Government's adjustment program and required. tentatively scheduled fo3 Finance consolidation of policy reforms January 1992. undertaken under SAL I and II. Emphasis will be given to agricultural and export promotion reforms. Total project cost estimated at $95.3 million. Environmental Assessment Category C. CAMEROON Ministry of Urban 40.0 (N) Urban Management Improvement - Consulting services will Project under and Housing (Bank) Project would clarify the roles of not be required. preparation. private and public actors and rationalize public investments in the urban sector. Project would also improve urban services financing mechanisms and urban land resources management, and rehabilitate parastatal housing agencies. Environmental Assessment Category B. National 20.0 (R) Vocational Education Training Consulting services will Project being identified, Employment Fund (Bank) (formerly Vocational Training) - To be required. support vocational training centers and programs by establishing a fund that would extend financing to those centers that respond to market needs. Environmental Assessment Category C. Ministry of Public 45.0 (R) Transport Sector - Development of Consulting services will Preparation mission Works and (Bank) transport sector policy objectives and be required to review scheduled for March 1992. Transport sectoral investment planning mechanism, different aspects of the based on economic priorities, comprising transport sector and, in all subsectors; development of a new particular, the trade road maintenance strategy, intermodal logistic subsector. efficiency and rationalization of transport sector public enterprise performance (air, rail, maritime, bus transport)l promotion of small enterprises; and institutional development, training and technical assistance. Environmental Assessment CategorY B. -6- Member Country, Amount & Implementing Probable Stage of Processing a Agency ' Lender Project Consulting Services Action on Procurement (Cont'd) Ministry of 40.0 (R) Private Sector Development - A Consultants have been Project was placed in Industry and (Bank) sectoral adjustment policy-based identified. the FY94 Reserve Prog Commerce operation designed to improve the local Further reporting wi: investment climate through: discontinued. (a) enhancement of the regulatory and legislative framework; (b) strengthening of the institutional environment; and (c) deepening of banking sector reform, including improving access to guarantees. Environmental Assessment Category C. Ministere de 30.0 (R) Agriculture Restructuring and Consulting services will Project unde L'Agriculture (Bank) Diversification (formerly Export be required. preparation. Promotion/Diversification) - To promote Consultants have export diversification crops, by private submitted preparation sector, and improve the regulatory reports. environment for new investments. Environmental Assessment Category B. Ministere de 40.0 (R) Education Sector Adjustment - Consulting services will Preparation mission L'Education (Bank) Implementation of national strategy for be required. scheduled for Februax Nationale at sustainable development, of education and 1992. Ministere de training in line with needs of the L'Enseignement economy. Environmental Assessment Superieur de la Category C. Technologie et de la Recherche Scientifique Ministry of 120.0 (R) Structural Adjustment II - Would Consulting services will Project was placed ir Planning (Bank) finance second stage of Cameroon's be required. the FY93 Reserve Prol adjustment. Principal components would Further reporting wil include: implementation of tax reform; discontinued. further civil service reform; reform of Government economic policy; programidng, budgeting and expenditure control; administrative reform in technical ministries; deepening of banking sector and public enterprise restructuring including action plans for petroleum sub-sector public enterprises; reform of forest resource management; study of environmental and sustainable exploitation issues; and further economic liberalization. Environmental Assessment Category C. Ministry of Public 40.0 Health and Population Sector - Focussing Consultants will be Project under Health and (Bank) on strengthening strategic management required. preparation. Ministry of Plan framework, financial and human resources and Territorial management, improving drug and other Management medical material distribution and strengthening of priority health programs. Environmental Assessment Category C. Ministry of 10.0 (R) Agricultural Research II - Follow up Consultants will be Pre-appraisal missioi Agriculture (Bank) effort emphasizing support to required. scheduled for mid-Ja implementation of an agreed national 1992. agricultural research program, and institutional reform. Environmental Assessment Category B. -7- Member Country, Amount & Implementing Probable Stage of Processing and Agency - Lender Project s Consulting Services Action on Procurement * CAMEROON (Cont'd) Ministry of 10.0 (R) Ecological Protection - To improve Consultants have been Project under Agriculture (Bank) institutions in charge of forest selected. preparation. management, conservation and finance activities for environmental protection (Possible financing from of biodiversity parks and reserves. An the Global Environment Environmental Assessment will be Facility (GEF) -- see comoleted. Environmental Assessment Annex C.) Category A. CAPE VERDE ENAPOR 18.0 (N) Transport/Infrastructure - Project To be determined. Preparation to start in (IDA) would: (a) maintain road network; early 1992. (b) reduce transport costs; (c) promote tourism; (d) strengthen management capabilities; and (e) alleviate water supply shortages. Environmental Assessment Category B. Ministry of 13.2 Education II - The objective of this To be determined. Project being identified. Education (IDA) project is to outline support to primary education, and development of post primary.education including technical education and vocational training. Environmental Assessment Category C. (ENAPOR) Empresa 20.0 (R) Export Promotion (formerly Transport To be determined. Project under Nacional de (IDA) Sector) - Upgrading of port facilities preparation. Administracio dos at Porto Grande, Mindelo Island, support Portos development of transshipment and attract foreign investments in port based activities. Total project cost is US$30.0 million. Environmental Assessment Category B. Ministries of 9.2 Human Resources - Assist the Government Consulting services will Project being identified. Education and (IDA) in implementing its export promotion be required (estimated Health policy. Scope to include definition and at 55.5 staffweeks). implementation of the related training and manpower development strategy and program. Investments to be supported likely to include: (a) vocational training to meet demand for technologically skilled labor; (b) management training; and (c) expansion and enhancement of quality or secondary education. Environmental Assessment Category C. CENTRAL AFRICAN REPUBLIC Ministry of 40.0 Structural Adjustment IV - To continue Consultants may be Preparation tentatively Finance, Economy, (IDA) to support the government in the required. scheduled for end FY92. Planning and implementation of its adjustment, International integrating approaches to resume growth Cooperation with equity. Environmental Assessment Catezory C. Member Country, Amount & Implementing Probable Stage of Processing an Agency Lender 2 Project ' Consulting Services Action on Procurement.' CENTRAL AFRICAN REPUBLIC (Cont'd) Ministry of Public 25.0 (R) Health Sector - Comprehensive health Consultants will be Project was placed inti Health and Social (IDA) sector reform program including required. the FY93 Reserve Progr4 Affairs components to strengthen sector Further reporting will organization and management, improve discontinued. resource allocation and mobilization and strengthen financial and human resource management and training. The project will include: (a) rehabilitation and re-equipping of rural health facilities, and development of a national maintenance system; (b) institutional support to strengthen sector planning and management; and (c) support for priority programs. Environmental Assessment Category C. Ministry of Rural 25.0 (R) Agriculture Services - To support Consulting services will Negotiations scheduled Development (IDA) strengthening of the Ministry of Rural be required. for mid-February 1992. Development, and of research and extension services. Environmental Assessment Category C. CHAD Ministry of Public 40.0 (R) Road Maintenance - Follow-up of the To be determined. Project processing has Works and (IDA) transport sector adjustment and feeder been delayed. Furthei Transport roads projects to sustain reforms and reporting will be liberalization of the sector. discontinued. Environmental Assessment Category C. Ministry of Public 20.0 (R) Municipal Development - Municipal To be determined. Project being identifI Works and (IDA) resource mobilization and infrastructure Transport upgrading. More effective public sector management. Institutional building and policy reform in the urban sector. Addressing critical environmental issues. Total project cost is US$40.0 million. Environmental Assessment Category B. To be determined 35.0 Reconstruction Import - To support To be determined. Project identificatic (IDA) public expenditure and other policy depends on satisfacto: reforms to sustain and promote activity progress under ongoin in key development sectors. operation. Environmental Assessment Category C. To be determined 35.0 Education V - Follow up operation to To be determined. Project under (IDA) pursue rehabilitation and extend it to preparation. secondary, higher and vocational education. Environmental Assessment Category C. To be determined 20.0 Agricultural Research - To strengthen Consultants will be Project under (IDA) crop, livestock, forestry and natural required (200 preparation. resource management research nationwide. staffweeks). Total project cost US$40 million. Environmental Assessment Category C. -9. Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project s Consulting Services Action on Procurement 4 CHAD (Cont'd) Ministry of Health 20.0 Population and Health - The project Consultants will be Project being identified. (IDA) would aim to: (a) reorient health care required. service to focus on the provision of an adequate package of basic primary care services to a larger segment of the population: develop and promote an acceptable family planning strategy, including sensitization activities; and (c) develop complementary programs/ activities in the areas of food security (i.e., nutrition), health, and family planning education, focussed particularly on women. If necessary, implementation will begin in one or two pilot zones. Environmental Assessment Category C. Ministry of 20.0 Agricultural Services - Promotion of Consultants will be Project under Agriculture (IDA) effective agricultural support services required. preparation. primarily focusing on research and (Estimated at 200 (Co-financing will be extension possibly with functional staffweeks). required possibly from literacy. Total project cost estimated CCCE (France), EEC at US$40.0 million. Environmental (Belgium), IFAD (Italy).) Assessment Category C. Ministry of Mines 50.0 Petroleum/Power - to support Under an engineering Project under and Energy (IDA) implementation of a least cost product project approved in preparation. supply system and provide technical November 1990, assistance to strengthen the engineering consultants Engineering project Government's management of the power and have been selected to approved November 1990. petroleum sector. Total project cost prepare three turnkey estimated at US$70.0 million. contracts. Environmental assessment completed under the Engineering Project. Environmental Assessment Catexory A. CaOtsS Ministry of 13.4 (R) Population/Human Resources - Will Consulting services Project under Health/Education (IDA) strengthen the primary health care will be required. preparation. system, particularly the quality of maternal and child health/family planning services; improve quality and efficiency of education through provision of equipment, textbooks and teacher guides; finance community construction/rehabilitation social infrastructure; and establish an appropriate institutional and policy framework. Environmental Assessment Category C. - 10 - Member Country, Amount & Implementing Probable Stage of Processing a Agency ' Lender 2 Project ' Consulting Services Action on Procurement COTE D'IVOIRE Prime Minister's 15.0 (N) Technical Assistance - Project is in Consulting services will Appraisal report unde, Office, Ministry (Bank) support of privatization, foreign debt likely be required for: preparation. of Finance rescheduling, and reinforcement of (a) privatization Abidjan Stock Exchange. Project is a program; (b) training in spin-off of the Economic Management foreign debt management; Project that requires additional and (c) strengthening of preparation of other components. Abidjan Stock Exchange. Environmental Assessment Category: To Be Determined. Ministry of 50.0 Livestock - Project is aimed at Consulting services will Preparation under way Agriculture dnd (Bank) developing the livestock production in be required to assess Animal Resources cost effective and sustainable manner feasibility of dairy and SONAPRA and at promoting institutional reforms development and needs which reduce and streamline direct for slaughterhouses. public involvement and encourage private participation. Environmental Assessment Category A. Ministere de 100.0. (R) Regulatory Reform - Reform economic Consultants have been- Negotiations complete 1'Economie et des (Bank) policy production export incentives in selected. Board presentation Finances order to improve the competitiveness of scheduled for the industrial sector, together with . December 19, 1991. substantial deregulation to improve business environment, enhancing potential for private sector development and investment, both domestic and foreign. Environmental Assessment Category C. Ministries of 20.0 (R) Economic Management Technical Consultancy services Project was placed in Fonction Publique, (Bank) Assistance - Providing support for likely to be required in the FY93 Reserve Prog Economie et (a) institution building within Ministry areas of civil service Further reporting wil Finance, and Plan of Economy & Finance, especially with reform, para-public discontinued. et Industrie respect to debt management, para-public enterprise reform, enterprise reform and privatization; privatization, debt (b) civil service reform; and (c) legal restructuring and and judiciary reform. Environmental national statistics. Assessment Category C. Ministerd des 50.0 Private Sector Energy - Would allow Consulting services Investors for the Mines, Industrie (Bank) government to have local gas resources required for: development of the ga et Energie, developed by the private sector to o Engineering studies; field and for new PETROCI reduce dependence on imported energy. o Offshore petroleum electricity generatit Power supply reliability would be studies; capacity have been improved by selected private sector o Market studies; and identified. Discuss investments. The project would lessen o Others to be ongoing between the environmental impact of energy determined. Government and privat consumption by moving away from liquid sector for these fuels and biomass to natural gas, and to investments. encourage additional private sector investment in the energy sector. Environmental Assessment Category B. Human Resources 75.0 Human Resources Adjustment I - To Consultants will be Negotiations complete IntermLnisterial (Bank) accelerate national development by required. Board presentation Committee 75.0 supporting evolution of a global human scheduled for (IDA) resources development policy and December 17, 1991. improving strategic sector management. Environmental Assessment Category C. - 11 - Member Country, Amount.& Implementing Probable Stage of Processing and Agency Lender . Project ' Consulting Services Action an Procurement 4 COTE D31VOTRE (Cont'd) Ministry of 40.0 (R) Transport Sector - Efficiency Consultants will be Road improvements and Equipment, (Bank) improvement of: (a) transport facilities required to review maintenance likely to be Transport and 30.0 (ports, airports, road network, different aspects of the subject of a separate Tourism (IDA) railways); (b) road maintenance; and transport sector. project scheduled for (c) trade logistic services (trucking, appraisal in May 1992. shipping, storage system, cargo Preparation of road and management services), aimed at improving transport projects to be Cote d'Ivoire's international undertaken with a competitiveness and reducing internal Japanese Grant and a transport costs. Environmental Project Preparation Assessment Category B. Facility. Office National 40.0 Third Telecommunications - The project To be determined. Preparation on hold due des Tele- (Bank) would support: (a) the implementation of to lack of decision from communications reform measures regarding sector Government re: Office National restructuring and institution building privatization. des Postes of ONTI (b) expand geographic coverage and extend digital services to meet unsatisfied demand and to improve service quality; and (c) improve the efficiency of the postal sector and its operating entity ONP. Environmental Assessment Category B. DJIBOUTI Ministry of Health 8.0 (N) Health - Project will: Project will require Project under (IDA) (a) strengthen delivery of primary about 200 staffweeks of preparation. health care and first level referral consulting services. services; (b) strengthen delivery of in- service training for staff; (c) strengthen institutional capacity of the Ministry of Health for sector planning, programming, budgeting and evaluation. Environmental Assessment Category C. EQUATORIAL GUINEA Ministry of Health 4.8 (N) Health Improvement - Project will Consulting services will Project was appraised in (IDA) strengthen sector management and service be required. October 1991. delivery capacity of the public health care system. Environmental Assessment Category C. Ministry of 10.0 Natural Resource Management and To be determined. An identification report Agriculture, (IDA) Conservation - Project would assist has been prepared. Some Livestock, Government in implementing a natural preparation work will be Fisheries, and resource management plan to assure both undertaken with a Forestry an optimal production level from the Japanese Grant. Further forest and conservation of the preparation will be environment. Environmental Assessment carried out at the Category D. beginning of FY93 because of budget constraints. - 12 - Member Country, Amount & Implementing Probable Stage of Processing ano Agency I Lender 2 Project 3 Consulting Services Action on Procurement ETHIOPIA Ministry of 150.0 Emergency Recovery and Reconstruction - To be determined. Appraisal mission in t) Finance (IDA) The project would comprise: (a) an field. emergency inputs program to "jump-start" the economy and basic social services; (b) a basic infrastructure reconstruction program to help increase small-scale industrial and agricultural employment for those most affected by the dislocation of communities. Environmental Assessment Category: To Be Determined. To be determined 50.0 Natural Gas and Petroleum - To supply Consulting services will Project design to be (IDA) LPG, gasoline and gasoil for domestic be required. reviewed in view of and commercial use. To finance change in Government. technical assistance covering monitoring, supervision and quality control and a feasibility study of large-scale gas project. Environmental Assessment Category B. Ethiopian Seed 55.0 (R) National Seed - Would reinforce To be determined. Appraisal mission Corporation (IDA) capability of national research system scheduled for mid- to provide adequate breeder seeds of February 1992. improved varieties; improve capacity to produce high quality seed; stimulate demand for improved seed through improvements and promotion; and create an enabling institutional and policy framework to promote the evolution of the industry and promote private sector participation. Environmental Assessment Category B. Ministry of 30.0 Highland Water Conservation - Soil and Consultants will be Project design to be Agriculture (IDA) water conservation support measures for required. reviewed in view of environmental protection and enhanced change in Government. productivity in the Highlands. Would comprise civil works, vehicles, equipment, technical assistance and training. Environmental Assessment Category D. Ministry of About Livestock Conservation - Consolidation Consulting services will Project design to be Agriculture 35.0 and extension of ongoing Fourth be required. reviewed in view of (IDA) Livestock Development Project plus change in Government. addition of sub-components, i.e. dairy. Environmental Assessment Category A. Ministry of 70.0 (R) Roads Rehabilitation - The project Consultants will be Project design to be Construction and (IDA) would comprise: (a) civil works - required. reviewed in view of t] Housing rehabilitation of 198.5 km of the Assab- change in Government. Mille road; (b) technical assistance - construction supervision; consultancy services and training and (c) local level transport - equipment, raw materials, training and pilot phase running cost. Project totals US$94.4 million with a foreign component of US$74.4 million. Environmental Assessment Category B. - 13 - Member Country, Amount & Implementing Probable Stage of Processing and Agency I Lender 2 Project Consulting Services Action on Procurement 4 ETHIOPIA (Cont'd) Ministry of About Peasant Agriculture Development Program To be determined. Project design to be Agriculture 55.0 II (PADEP II) - Improving productivity reviewed in view of (IDA) in the peasant sector. Components change in Government. include improvements in marketing (lines of credit, institution strengthening); technology (improved seeds, rural workshops); and Ministry of Agriculture operations (extension, cooperatives, field trials). Environmental Assessment Category B. Ministry of Coffee 60.0 Peasant Coffee Development - The project Consultants will be Project design to be and Tea (IDA) would strengthen government support required. reviewed in view of Development services for food and coffee production change in Government. in the major coffee producing areas. Support would also be given to expanding washed coffee primary processing factories, rehabilitating coffee hulleries and improving export processing facilities. Environmental Assessment Category B. To be determined 18.3 Population I - To launch implementation To be determined. Project design to be (IDA) of Government population policy and reviewed in view of strategy. Environmental Assessment change in Government. Category C. GABON Ministry of 18.3 (R) Forestry/Environment - (a) better Consultants will be Project under Fisheries & (Bank) use of forestry resources through required. preparation. Appraisal Forestry, Ministry implementation of management plan in mission in the field. of Environment, First Zone of forest areal (b) reinforce Tourism and strategic planning, operational National Parks capability of Government institutions in the sector; (c) resume forestry and environment research; (d) make forestry and environment training more practical and relevant to needs of private sector; (e) prepare an environmental action plan; and (f) support Government in the creation and maintenance of wildlife reserves. An environmental impact assessment was initiated in June 1991. A PPF was approved in June 1991 to finance preliminary studies needed to better define the scope of proiect components. Environmental Assessment Category A. THE GAMBIA Ministry of 10.0 Urban Environment - Project would: To be determined. Project under Finance (IDA) improve living conditions through preparation. extension of infrastructure network and in sanitation strengthen principal institutions in the urban sector and operationalize the new enabling legislation and regulation to facilitate administration of land and housing development and strengthen key tourism institutions, etc. Total project cost is US$23.0 million. Environmental Assessment Catenory A. 14 Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement 4 THE GAMBIA (Cont'd) Ministry of 20.0 (R) Agricultural Services - Further Consultants will be Project under Agriculture (IDA) development of extension research and required (estimated at preparation. possibly credit services nationwide. A 100 staffweeks). natural resources management component will address the issue of deteriorating soil fertility throughout the country. Total project cost US$15.0 million. Environmental Assessment Category C. Ministry of 45.0 Tertiary Education - The project would To be determined. Pre-appraisal mission in Education (MOE) (IDA) support Government reform of tertiary the field. education, particularly universities and A PPF of US$580,000 was polytechnics, which will make them more approved in October to relevant to national development and finance expenditures consistent with lover educational including consultant levels, and substantially improve services required to quality and cost effectiveness. complete the preparation Environmental Assessment Category: To and planning of Be Determined. implementation, and strengthening of the Ministry of Education. To be determined 37.0 Rural Water - To improve access to rural Consulting services will Project under (IDA) water supply and sanitation throughout be required to assist in preparation. Ghana, through rehabilitation/construc- preparation of tion of appropriate facilities and institutional establishing community responsibility arrangements and private for operation and maintenance, sector role. Environmental Assessment Category: To Be Determined. Ministry of Roads 55.0 (R) Feeder Roads - To support Consulting services will Negotiations completed. and Highways (IDA) agricultural production in rural areas be required for studies, Board presentation Department of through programs of basic infrastructure technical assistance and scheduled for Feeder Roads mainly rehabilitation and regravelling training details to be December 19, 1991. of existing rural road network; determined. institutional support to improve the management and technical capabilities of local institutions will be a key feature. Environmental Assessment Category B. Bank of Ghana 100.0 (R) Financial Sector Adjustment - Consultants will be Negotiations completed. (IDA) Strengthening and diversifying the required for Board presentation financial sector. The project would: strengthening the scheduled for (a) support policies to strengthen the operational capacity of December 19, 1991. institutional framework in the financial the Central Bank and sector, improve competition and other technical strengthen financial and operational assistance components capacity of the Central Bank under the program. (b) support ongoing restructuring of formerly distressed banks; (c) commence recovery of non-performing asetgs (d) develop an appropriate institutional framework to enhance effectiveness of nonbank financial institutions; and (e) study informal financial markets and help upgrade skills of bankers, accountants and financial professionals. Environmental Assessment Cateorv C. - 15 - Member Country, Amount & Implementing Probable Stage of Processing an Agency ' - Lender 2 Project s Consulting Services Action on Procurement GEMEA (Cont'd) Ministry of 41.0 (R) Livestock - To strengthen livestock Consulting services will Appraisal mission Agriculture, (IDA) production through improvement of animal be required (estimated tentatively scheduled f Department of health, provision of animal watering at 29 staffweeks). February/March 1992. Animal Health and points, dry season feeding, breed Production improvement, and strengthening of the institutional framework for livestock production. Environmental Assessment Category A. Ministry of 25.0 (R) Agricultural Extension - Strengthen Consultant will be Board presentation Agriculture (IDA) the agriculture extension system through required (estimated at scheduled for improved extension, programming and five staffweeks). February 11, 1992. supervision; strengthening extension- research linkages and staffing; and emphasizing gender related issues through the Government's women in development program. Environmental Assessment Category B. Ministry of 40.0 Adult Literacy - Project would To be determined. Appraisal completed. Education (IDA) consolidate infrastructure developed Negotiations tentativel under Program of Action to Mitigate the scheduled for January Social Costs of Adjustment (PAMSCAD) and 1992. strengthen regional and district A PPF of US$750,000 was capabilities in order to support a approved in October to massive functional literacy campaign by finance expenditures, providing technical assistance, teaching including consultant equipment, and training. Environmental services, required to Assessment Category C. complete preparation activities. Ministry of 80.0 (R) Agricultural Sector Adjustment - To To be determined. Negotiations tentative] Agriculture (IDA) strengthen pricing and marketing scheduled for January reforms. Improve sector coordination, 1992. Board presentati and strengthen public expenditure scheduled for March 19 management. Environmental Assessment Catexory C. GUINEA Ministry of Plan 25.1 (R) Public Enterprise SECAL - Credit to Consultants will be Appraisal mission and International (IDA) support the Government's public required for preparation tentatively scheduled I Cooperation enterprise reform program aimed at a and implementation. February 1992. more efficient and effectively managed public enterprise sector. Environmental Assessment Category C. Ministry of Public 25.0 Health II - Policy-based operation Consulting services will Project preparation unc Health and (IDA) focussing on strengthening investment be required for way. Population and recurrent budget planning, human preparation. resources management, renovating depleted infrastructure and strengthening priority health programs. Environmental Assessment Category C. - 16 - Member Country, Amount & Implementing Probable Stage of Processing an Agency ' Lender Project s Consulting Services Action on Procurement 4 GUINEA (Cont'd) To be determined 30.0 Transport and Urban Infrastructure - To be determined. Project under (IDA) (a) Priority urban infrastructure preparation. Pre- investments in Conakry and secondary appraisal mission cities; (b) a tranche of additional road scheduled for upgrading as defined in the long-term February 1992. road development plan; (c) priority investments of transport parastatals, including fishing port in Conakry; and (d) improving urban management and environment, including road safety and traffic management. Environmental Assessment Category B. Ministry of 32.6 (R) Export Crop - Project to strengthen To be determined. Staff appraisal report Planning and (IDA) incentives framework and supply response review meeting schedul4 International in agricultural export sector. Project for mid-January 1992. Cooperation would include: (a) institutional building (in particular the Chamber of Commerce); (b) support to private investments; and (c) special programs. Environmental Assessment Category B. ENELGUI 70.0 (R) Power II - Project would seek to: Consulting services will Appraisal mission (IDA) rehabilitate power utility infrastruc- be required to assist scheduled for January ture for industrial and commercial Government in 1992. activity in the main development zone implementing its (Conakry/Kindia region); technical privatization strategy assistance to ENELGUI management. for the power sector. Environmental Assessment Category B. GUINEA-BISSAU Bank of Guinea- 8.0 (R) Technical Assistance - To strengthen To be determined. Appraisal completed. Bissau, Ministry (IDA) economic management and institutional Negotiations scheduled of Economy and capacity. Environmental Assessment for December 1991. Finance Category C. Ministry of 31.8 SAC III - Further policy reforms being To be determined. Appraisal mission Economy and (IDA) taken under SAL I and SAL II. scheduled for January Finance Environmental Assessment Category C. 1992. Ministries of 13.0 (R) Social II - To further rehabilita- Consultants will be Identification/ Education, Health (IDA) tion of education and health facilities; required for project preparation mission and Women's provide inputs; information, education preparation. completed. Appraisal Affairs and communications to improve health mission scheduled for hygiene and adult literacy; training: May 1992. income generating activities for women. Environmental Assessment Category C. Ministry of Rural 10.0 (R) Natural Resources - To support agro- Consultants will be Project under Development and (IDA) forestry sector development. required for project preparation. Pre- Agriculture Environmental Assessment Category D. preparation. appraisal scheduled fc September 1992. - 17 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project Consulting Services Action on Procurement 4 KENYA Kenya Ports 75.0 Transport Corridor - To rehabilitate Consultants shortlisted Project under Authority (KPA), (IDA) container berths, additional container for PPF studies. preparation. Kenya Railways handling equipment, construction of Consulting services will Corporation container freight station, rehabilita- be required during (Department of tion of shunting locomotives, new implementation. Customs) mainline locomotives, improvements to KR communications, and customs and transit reform. Also, management support to KPA and KRC, and institutional program. Environmental Assessment Category: To Be Determined. Ministry of 10.0 (R) Parastatal Reform and Private Sector Consulting services will Project under Finance (IDA) Development Technical Assistance - be required for preparation. Appraisal Operation will provide technical privatization, mission scheduled for assistance to: (a) staff technical unit regulatory reform. March/April 1992. for privatization: (b) implement reforms for strategic parastatals; (c) auditor general (state corporations) to improve auditing functions; (d) registrar general to improve data bases; (e) the capital markets' authority; (f) support legal work on regulatory reform in the Attorney General's office. Environmental Assessment Category C. National Water 44.0 Second Mombasa and Coastal Water Supply Consulting services will Negotiations completed. Conservation and (IDA) Engineering and Rehabilitation - Project be required for: Board presentation Pipeline would provide for: (a) pre-investment (a) institutional scheduled for January 28 Corporation studies and detailed engineering designs improvement (studies and 1992. for expansion of the Mombasa and Coastal advisory services; and Water Supply System; (b) assistance to (b) pre-investment National Water Conservation and Pipeline studies and detailed Corporation for institutional engineering designs. strengthening/capacity building to ensure its ability for the proposed project; and (c) a reduction in the water supply deficit in the near term through rehabilitation/augmentation of the existing water supply facilities. Total project cost is US$48.7 million. Environmental Assessment Category B. To be determined Up to Smallholder Dairy - Project would To be determined. Initial mission report 30.0 facilitate implementation of policy, received. Project under (IDA) legislative and structural reforms for preparation. strengthening the industry and for sustainable growth. Environmental Assessment Category B. Ministry of About (R) Universities - Program of assistance Consultancy will be Approved by the Executiv Education 55.0 to Kenya's public university system to required for systems Directors on November 14 (IDA) build central institutions, strengthen analysis, financial 1991. Credit was signed the student loan, scheme and make management, and various on December 11, 1991. investments in the universities to studies enhance the quality of teaching. Environmental Assessment Cateiory C. - 18 - Member Country, Amount & Implementing Probable Stage of Processing an Agency I Lender 2 Project Consulting Services Action on Procurement KENYA (Cont'd) Ministry of About (R) Support for Wildlife Management - To be determined. Negotiations completed Tourism and 60.0 The project would support improvements Board presentation Wildlife (IDA) to wildlife park and revenues management scheduled for March 26 and infrastructure, and develop 1992. sustainable economic opportunities for (Possible financing fr people living in and around parks. the Global Environment Environmental Assessment Category D. Facility (GEF) -- see Annex C.) Ministry of Health About (R) Health Rehabilitation - Consultants will be Approved by the Execut 31.0 Rehabilitation and reform of the required. Directors on November (IDA) Kenyatta National Hospital, improvement 1991. Credit was sigr of other Nairobi area facilities, and on December 11, 1991. preparation of future sectoral reform. Environmental Assessment Category C. Ministry of Health About Health and Nutrition Sector Adjustment - Consultants will be Project preparation w 70.0 Support widespread sectoral reform. required and are likely start once the Health (IDA) Environmental Assessment Category C. to be financed under the Rehabilitation Project Health Rehabilitation becomes effective. Project. LESOTHO Ministry of 12.0 (N) Infrastructure Maintenance To be determined. Project being identif: Transport and (IDA) Engineering - To prepare program Works rehabilitating and maintaining roads and other infrastructure, and strengthening long-term planning of infrastructure investments. Environmental Assessment Category B. Ministry of 10.0 Public Sector Financial Management - To be determined. Project under Finance and (Bank) Expansion of pilot program for improving preparation. Planning budgetary management and financial reporting in government, and strengthening linkages between budgetary control and development planning. Training in the Government's new financial management system will be emphasized. Environmental Assessment Category: To Be Determined. MADAGASCAR Ministere des About (R) Telecommunications - Financing of Consulting services will Project under Postes at 33.4 investments in the telecommunications be required. preparation. Telecommunications (IDA) sector and support for sectoral policy reforms and institutional assistance. Environmental Assessment Category B. Ministry of 20.0 Export Crop Promotion - Will assist Consulting services Project preparation i Agriculture (IDA) producers, transformers and exporters in will be required. way. prospecting markets, developing new products or improving existing ones, and investing in the agro-industrial sector. Environmental Assessment Category: To Be Determined. - 19 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project 3 Consulting Services Action on Procurement MADAGASCAR (Cont'd) Banque Centrale de 40.0 (R) Financial Sector Development To be determined. Project being identified la Republique (IDA) (formerly Financial and Private Democratique de Sector/Apex) - To support further reform Madagascar in the financial and industrial sectors. Environmental Assessment Category C. Ministry of About Rural Finance - Project, on a pilot Specialists in rural Preparation completed. Agriculture 9.0 basis, to support and promote a rural savings and loans and Appraisal mission date t (IDA) savings and loan movement based on the credit union be scheduled in light of existing and possibly new grass root movement will be country conditions. institutions. Environmental Assessment required.. Category C. Ministry of About Petroleum Sector Reform - Will include Consultants have been Appraisal report under Industry, Energy 46.9 reform of the petroleum pricing and contracted. preparation. and Mines/SOLIMA, (IDA) taxation system, new policies to (Petroleum increase efficiency in petroleum supply Company) and distribution, rehabilitation and improvement of the refinery, investments in petroleum transport and distribution and institutional strengthening of MIEM and SOLIMA. Since the project will upgrade existing facilities, environmental effects are limited. Environmental Assessment Category B. Ministere des About Transport Sector - To improve Consultants will be Appraisal mission Transports, de 46.0 infrastructure for coastal shipping, air required. tentatively scheduled fc Meteorologie et (IDA) and rail transport. Environmental early 1992. Schedule tc de Tourisme Assessment Category B. be reviewed in light of country conditions. Ministry of About (R) Vocational Technical Education - Consulting services will Negotiations tentatively Education; 23.3 Develop vocational training and be required. scheduled for January Ministry of Civil (IDA) technical education, including 1992. Timing may be Service and Labor establishment of coordination structure revised when situation and training funds; support for training permits. school for senior civil servants. Environmental Assessment Catexory C. Ministry of About (R) Food Security and Nutrition - Consulting services will Post appraisal mission Agriculture 19.4 (a) Address short and medium-term be required. tentatively scheduled fc (IDA) problems of rural and urban food March 1992. insecurity; (b) Support child nutrition programs; (c) Support nutrition education and other programs to improve micro-nutrient intake; (d) Support research and monitoring of nutrition issues; (e) Begin to address the intra- household resource allocation issues. Environmental Assessment Category C. Central Bank of About (R) Private Sector Environment Consultants likely to be Further processing on Madagascar 117.0 Adjustment (PRIVAC) Credit - To required. hold due to political (IDA) consolidate the reforms undertaken so situation. far and to support the next stages in the reform of the incentive system and regulatory environment in support of private sector activities. Environmental Assessment Category C. - 20 - Member Country, Amount & Implementing Probable Stage of Processing a Agency Lender 1 Project S Consulting Services Action on Procurement MADAGASCAR (Cont'd) Ministry of About (R) Energy II - The project will Consultants have been Project preparation L Industry, Energy 53.4 continue the rehabilitation of the power appointed for under way. and Mines (IDA) network and may include a new hydro- preliminary electric power plant (Ambodiroka) as environmental studies well as investments in transmission and relating to Ambodiroka. distribution, based on a least-cost power master plan; dissemination of the improved carbonization techniques developed at the Haut Mangoro Fanalamanga's plantation; industrial energy efficiency projects; and continuity for technical assistance for energy and power systems planning. Total project cost estimated at US$80.0 million. The engineering studies for the Ambodiroka power plant, which are being undertaken at this time, include a detailed environmental assessment. The dissemination of improved carbonization technicues will have positive environmental effects. Environmental Assessment Category B. MALAWI Ministry of 37.0 (N) Institutional Development II (ID II) To be determined. Identification/ Finance (IDA) - Project will continue the efforts preparation scheduled begun under (ID I) to strengthen February 1992. Government capacity for economic and financial management, and to support the Government program to improve the public sector. Environmental Assessment Category C. Ministry of 25.0 (R) Financial Services - Project will To be determined. Pre-appraisal mission Agriculture (IDA) increase agricultural production and scheduled for March 1 other productive rural activities by and appraisal mission providing financial and technical scheduled for June 19 support additional credit for rural enterprise assistance. Government will strive toward improving the policy and institutional framework for rural financial intermediation. Environmental Assessment Category C. Electricity Supply About Power V - Will provide for expansion and To be determined. Appraisal report unde Commission; 50.0 rehabilitation of power generation, preparation. Department of (IDA) transmission and distribution and (Co-financing will be Economic Planning provide support to energy planning. 4 required). and Development draft report on field studies for environmental assessment has been completed. Environmental Assessment Category A. Ministry of Local 20.0 Local Government Development - Central To be determined. Post appraisal missic Government (IDA) objective will be strengthening of local mid-December 1991. government to finance essential services Negotiations tentatiN and manage traditional housing area scheduled for mid-Mai programs on a self-sustaining basis. 1992. Some elements such as rehabilitation of (Co-financing will be sewerage treatment and solid waste required). services will have Positive effects on sanitation. Environmental Assessment Category C. - 21 - Member Country, Amount & Implementing Probable Stage of Processing and Agency 1 Lender Project Consulting Services Action on Procurement 4 MALAWI (Cont'd) Ministry of 40.0 (R) Agricultural Services - Will Consultants have been Project under Agriculture (IDA) continue support for strengthening appointed to prepare preparation. Pre- smallholder services on a national level project. appraisal mission and build on current programs to improve scheduled for June 1992. the national research, extension, and (Co-financing of about key inputs (especially fertilizers and US$25 million will be seeds) credit services to alleviate required). poverty and food insecurity through increased agricultural productivity of an increased proportion of smallholders. It is unlikely that project will result in significant environmental impact; project will support integrated pest management. Environmental Assessment Category B. Ministry of 70.0 (R) Entrepreneurship and Capital Consultants in labor and Negotiations scheduled Finance (IDA) Market - Project will provide continued capital market will be for February 1992. support for Malawi Adjustment Program, needed. (Co-financing of about with a focus on factor markets and low US$75 million will be income groups. Environmental Assessment required). Category C. MALI Ministry of Civil 15.0 (R) Public Works and Capacity Building - To be determined. Appraisal mission Service and (IDA) The project will finance a program of scheduled for February Employment public works to be carried out by the 1992. private sector using labor-intensive A second PPF for technique to create employment. Total US$750,000 was granted on project cost is US$25.0 million. October 4, 1991. Environmental Assessment Category C. Institut 29.0 Agricultural Research - To strengthen Consultant will be Project under d'Economie Rurale (IDA) crop, livestock, forestry, and natural required (estimated at preparation. (iER); Institut resource management research nationwide. 200 staffweeks). (Co-financing will be National de Total project cost estimated at required possibly from Recherche US$30.0 million. Environmental FAC and USAID.) Zootechnique, Assessment Category C. Forestiere et Hydrobiologique (INRZFH) Ministere des 35.0 (R) Private Sector Development - Consultants will be Appraisal report under Finances et du (IDA) Financial, technical and training required. preparation. Commerce assistance to private businesses as well as to improve the institutional support structure, including technical support for business promotion, export niche development, joint ventures, management and accounting improvements and development, including assistance to banks for project appraisal and supervision; and gold mining promotion. Environmental Assessment Category B. -22- Member Country, Amount & Implementing Probable Stage of Processing an Agency Lender Project Consulting Services Action on Procurement MALI (Cont'd) Ministere de 25.0 (R) Natural Resources Management - Consultants will be Appraisal report under l'Environnement et (IDA) Finance a wide range of multi-sectoral required (estimated at preparation. du Developpement natural resource management activities 200 staffweeks). (Possibility of co- Rural at village, departmental and national financing with Caisse levels. To include field operations, Centrale (CCCE, France training, data collection and analysis Deutsche Gesellschaft and institutional development. Total Technische Zusammenarb project cost is estimated at US$26.0 (GTE, Germany), United million. The Project has been Nations Sahelian Offic specifically designed to have a strongly (UNSO), and United positive environmental impact. Nations Development Environmental Assessment Category C. Programme (UNDP)). Ministry of Public 70.0 (R) Infrastructure/Transport Sector - Consultants will be Project processing Works and (IDA) Would support preparation of required for preparing delayed. Further Transport comprehensive three year investment the different project reporting will be program focusing on maintenance of components. discontinued. existing infrastructure and improved management of sector parastatals, based on detailed action plans. The problem of urban and interurban/international transport would be addressed. Total project cost is US$80.0 million. Environmental Assessment Category B. Ministry of 35.0 Irrigation Promotion - Promotion of Consultants will be Pre-appraisal mission Agriculture, (IDA) private irrigation and selected required (estimated at scheduled for May 1991 Livestock and rehabilitation of some publicly 200 staffweeks). Project preparation v Environment constructed irrigation schemes. Total only begin when project cost estimated at preliminary studies oi US$40.0 million. Environmental irrigation have been Assessment Category A. completed by a workin group in the Mallan Ministry of Agricultu, A PPF has been proces to fund preparation activities through lo consultants. (Co-financing will be required. Possibly f KfW and FED.) MAURITANIA To be determined 25.0 (N) Construction Industry Development - To be determined. Preparation to begin (IDA) Project will carry out labor-based works April 1992. for the Ministry of Works and the City Council of Nouakchott. Would also reform and streamline procedures for contract management, and develop the domestic construction industry. Environmental Assessment Category C. SONELEC/Ministry 20.0 (R) Water Supply - Reinforce Nouakcnott To be determined. Appraisal mission of Interior (IDA) water supply system, rehabilitate water scheduled for Februas and electricity system in interior 1992. centers, and strengthen SONELEC through technical assistance. Strengthen Government agencies in charge of preparing and implementing municipal development strategy. Total project cost is US$65.0 million. Environmental Assessment Category B. - 23 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project s Consulting Services Action on Procurement 4 MAURITANIA (Cont'd) Ministry of Health 15. 7 Population and Health - To improve Consultants will be Approved by the Executive (IDA) effectiveness of health care systems required. Directors on November 19, including family planning and to assist 1991. in formulating population-related action programs. Environmental Assessment Category C. To be determined 17.0 (R) Agricultural Services - Improvement Consultants will be Project under (IDA) of research and extension, possibly also required (estimated at preparation. crop protection and agricultural 150 staffweeks). (Co-financing from BMZ education nationwide. Total project (Germany), and FAC cost estimated at US$25.0 million. (France) possible.) Environmental Assessment Category C. To be determined 17.0 (R) Irrigation Promotion - Development Consultants will be Project preparation is (IDA) of private irrigation plus selected required. (Estimated at expected to take place in rehabilitation of publicly constructed 100 staff weeks). April 1992 when all irrigation schemes. Total project cost conditions for release of estimated at US$40.0 million. agriculture Secal second Environmental Assessment Category A. tranche have been met. (Co-financing will be required. Possibly from KfW and FED.) MAURITIUS Ministry of 10.0 Education III - Action would support Consultants may be Project under Education, Arts (Bank) implementation of the Education Sector required. preparation. and Culture Master Plan (ESMP). Currently under preparation by the Government of Mauritius. Environmental Assessment Category C. Mauritius Sugar 10.0 (R) Sugar Energy Development (formerly Consulting services will Negotiations scheduled Authority (Bank) Bagasse Energy Development) - The be required for detailed for January 1992. project would: (a) establish a bagasse- engineering of power (Global Environment cum-coal field power plant at a sugar plants. Facility financing of factory in the southern part of the US$3.0 million expected island; (b) modernize sugar mills and -- see Annex C.) increase surplus bagasse through investment in improved steam generation and utilization (c) develop technology for biomass utilization; and (d) strengthen institutions. Environmental Assessment Category A. MZAMBIqUE To be determined 80.0 (R) Rural Restructuring - Rehabilitation To be determined. Appraisal mission (IDA) of rural infrastructure and productive scheduled for February structures, and reactivate production 1992. services in restricted number of PDP districts. Project components would include: (a) reconstruction/rehabilita- tion of rural infrastructure; (b) rehabilitation of agricultural support services; and (c) technical assistance. Environmental Assessment Category B. - 24 - Member Country, Amount & Implementing Probable Stage of Processing a Agency ' Lender 2 Project ' Consulting Services Action on Procurement MEZAMBIQUE (Cont'd) Ministry of Health 44.0 Second Health and Nutrition - Consulting services will Project under (IDA) Development of institutional capacity be required. preparation. Pre- including strengthening health program appraisal mission management and planning, technical scheduled for March 1 guidance and training, and improved implementation in collaboration with NGOs. Project funds for: (a) rehabili- tation equipment of health posts and rural hospitals; (b) limited support for urban health infrastructure (c) health manpower training; (d) drugs and medical supplies availability and distribution and (e) support to special health programs (communicable disease control and safe motherhood). Environmental Assessment Category C. Ministry of 60.0 (R) Capacity Building - To create To be determined. Project under Education/Eduardo (IDA) expanded development capacity with preparation. Pro- Mondlane special emphasis on the public sector. appraisal mission in University Project likely to include the following field. components: (a) donor-support incentive package for senior civil servants; (b) selected improvements at the university; (c) special enrichment programs for promising secondary school students; (d) short in-service and on- the-job training for public and private employees; and (e) limited pre-service training, both locally and abroad. The project would enrail policy reforms in the areas of public pay and employment and in the management of foreign technical assistance. Environmental Assessment Cate&ory B. Ministry of State 15.0 (R) Urban Environment Rehabilitation - To be determined. Urban local governme Administration & (IDA) Engineering credit will provide: review under prepara Ministry of (a) technical assistance and training Project was identifi Construction and for urban management and institutional and followed by mult Water strengthening (b) technical assistance donor workshop in and financial support for environmental November 1991. rehabilitation and (c) financing for municipal or districts governments for specific infrastructure and services needs. Probable total cost US$15.0 million. Environmental Assessment Category: To Be Determined. Ministry of 35.0 (R) Agricultural Services Rehabilitation To be determined. Negotiations complet Agriculture (IDA) and Development - To support the Board presentation Government of Mozambique's efforts to scheduled for mid- rehabilitate and develop agricultural February 1992. services; reverse the decline in production of foodcrops and cotton thus reducing poverty and improving food security; and strengthen local capacity to formulate and implement agricultural development activities. Total project cost is US$40.6 million. Environmental Assessment Catezory B. - 25 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project Consulting Services Action on Procurement NZAnuMzqU (Cont'd) Ministry of 75.0 Roads and Coastal Shipping - Consultants will be Appraisal report under Construction and (IDA) Rehabilitation and maintenance of required for design and preparation. Water and Ministry selected feeder roads and sections of supervision of civil (Co-financing being of Transport and the national road network and small works, training, and for sought to cover financing Communications coastal shipping ports. Environmental studies, procurement gap). Assessment Category B. management, and technical assistance in management areas for both roads and coastal shipping. Bank of Mozambique 129.0 (R) Economic Recovery (formerly Economic Consulting services will Appraisal report under (IDA) Adjustment Program) - Support for be required for banking preparation. Government's economic rehabilitation sector reform, reform of (Co-financing will be program. Environmental Assessment the foreign exchange required). Category C. allocation system, privatization and restructuring of state enterprises. NIGER Non-Governmental 10.0 Private Irrigation - Development of Consultants will be Appraisal report under Agency (IDA) private irrigation (a) small-scale, by required (estimated at preparation. low-lift pumping from shallow aquifers; 38 staffweeks). (Co-financing with CCCE (b) large-scale, by pumping from the (France)). Niger River. Total project cost, estimated at US$12.0 million. Environmental Assessment Cateaorv B. Ministry of 16.4 (R) Agricultural Services - Promotion of Consultants will be Appraisal report under Agriculture and (IDA) effective agricultural support services required (estimated at preparation. Livestock nationwide, primarily focussing on 150 staffweeks). extension. Total project cost estimated at US$18.5 million. Environmental Assessment Category C. Ministry of Plan 20.0 (R) Municipal Infrastructure - The Consultant will be Project under (IDA) project will strengthen technical required for project preparation. capabilities of municipalities and their preparation, technical A PPF advance for ability to mobilize local resources, assistance for design US$750,000 was approved increase productivity of self-employed and supervision of on January 12, 1990 for artisans and micro-enterprises. Total works, training and for project preparation. project cost is US$50.0 million. studies. Environmental Assessment Category B. Ministere de la 20.0 (R) Population - The project will To be determined. Negotiations scheduled Sante Publique, (IDA) improve population planning and program for February 17, 1992. Ministere du Plan,- development, develop and extend family (Co-financing is Ministere des planning services and maternal health expected.) Affaires Sociales services, and support associated et de la Promotion programs to improve the status of women. de Ia Femme Environmental Assessment Category C. - 26 - Member Country, Amount & Implementing Probable Stage of Processing at Agency ' Lender 2 Project ' Consulting Services Action on Procurement NIGER (Cont'd) Ministeres de 25.0 Human Resources SECAL - Continued Consultants will be Negotiations date to I 1'Education, du (IDA) support to expand and improve quality of required during determined in light of Travail et de primary education; restructuring of implementation. progress of discussior 1'Enseignement technical and vocational education and with Government regard Superieur consolidation and quality improvement in policy reform package. higher education. Environmental (Possibility of co- Assessment Category C. financing from CIDA, I Germany, the Netherlar and Norway). To be determined 51.1 SAL II - Support further adjustment of To be determined. Project identificatioi (IDA) the economy by extending policy changes will commence in to new areas such as industry and trade, conjunction with and the banking sector while deepening completion of public civil service reform in agriculture and expenditure review an4 public resource management. preparation of PIP. Environmental Assessment Category C. Ministere de 16.6 (R) Natural Resource Management - Consultants (estimated Project under l'Agriculture et (IDA) Finance a wide range of natural at 400 staffweeks) will preparation. de 1'Elevage resources management activities at be required. (Co-financing with CC village, departmental and national (France), NORAD (Nor levels. This will include field and USAID). operations, training, data collection and analysis and institutional development. Total project cost estimated at US$27.0 million. The prolect has been specifically designed to have a strongly positive environmental impact. Environmental Assessment Category C. Ministry of Public 30.0 (R) Transport Sector II - Project Consultants required to Negotiations tentativ Works; Ministry of (IDA) objectives are: (a) to redirect public design and supervise rescheduled for Transport expenditure in road sector to road works, elaborate March 1992. maintenance; (b) to increase user cost and support execution of recovery; and (c) to consolidate action plans for institutional building achivements. improving transport and The project will finance a three-year promote local tranche of investments and a maintenance contractors, and provide program. Environmental Assessment technical assistance to Category B. institutional development. NIGERIA Ministry of Works 75.0 Lagos Urban Transport - To improve Consulting services will Project preparation t and Transport (IDA) supply and productivity of urban be required. Way. (Lagos State transport. Project would support: Government) (a) improvements in efficiency of transport infrastructure through priority road maintenance and rehabilitation, and traffic management and traffic flows enforcement; (b) facilitate integration of urban transport elements and reduce traffic congestion; and (c) support institutional reforms and human resource development. Environmental Assessment Category B. - 27 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lander Project Consulting Services Action on Procurement NIGERIA (Cont'd) Nigerian Railway 100.0 Railways - The main objectives of the Consulting services will Project preparation under Corporation (Bank) project are to support the institutional be required. way. strengthening of NRC and to finance a rehabilitation and commer-calization program (locomotives, wagons, track, telecommunications, workshops). The project will support the commercialization program including financial restructuring, and improvements in its organization, corporate planning, and operational capabilities. Environmental Assessment Category B. To be determined 150.0 (R) Financial Sector (SECAL) - Building To be determined Preparation under way. (Bank) on reforms initiated under the ERP Loan (FY90) will: (a) Further liberalization exchange and interest rate determination mechanisms; (b) Remove remaining sectoral targets; and (c) Reform legislative and fiscal frameworks with a view to ensuring more prudent practices in the financial sector. Environmental Assessment Category C. Federal Ministry 50.0 (R) Mass Education - Support to Nigerian Consultants will be Preparation under way. of Information (IDA) television and radio authority for required for upgrading Appraisal mission social marketing programming. studios and program scheduled for April 1992. Environmental Assessment Category C. development. National Electric 150.0 (R) Power System Rehabilitation and Consultants will be Appraisal completed. Power Authority (Bank) Development - Rehabilitation of required. Negotiations tentatively generation, (KANSI Hydroelectric Power scheduled for March 12, Station), transmission and distribution 1992. facilities. Expansion of transmission (Possible financing from and distribution network. Environmental the Global Environment Assessment Category B. Facility (GEF) -- see' Annex C.) Ministry of 25.0 (R) Environmental Management - Project Consulting services will Negotiations completed. Finance (IDA) will finance a "Care Program" of be required. Board presentation environmental activities that are scheduled for January 28, critical for making Nigeria's 1992. environmental program operational. Environmental Assessment Category D. Federal Department 42.5 (R) Agricultural Technology Support - Short-term consultants Staff appraisal report of Agriculture and (Bank) Strengthen the institutional environment will be needed to assist completed. Negotiations Rural Development, and operational activities to adapt in adaptive research, completed. Board State Ministry of improved technology packages and their monitoring and presentation April 21, Agriculture, delivery system to meet location- evaluation, financial 1992. specific needs of farmers. accounting, and staff Environmental Assessment Category B. development and training. Federal Department 67.5 (R) Fadama Development - For developing Consultants will be Negotiations completed. of Agriculture and (Bank) a maximum of 100,000 ha of fadama by required for design Board presentation Rural Development, small-scale irrigation. Environmental supervision of road tentatively scheduled for State Ministry of Assessment Category B. construction and March 31, 1992. Agriculture drilling of tubevells by contract. - 28 - Member Country, Amount & Implementing Probable Stage of Processing an Agency I Lender 2 Project s Consulting Services Action on Procurement NIGERIA (Cont'd) Federal Ministry 100.0 (R) State Roads - To support a five-year Consultants would be Project under of Works and (Bank) program for state roads upgrading, required in the survey preparation. Appraisal Housing rehabilitation and maintenance, of state road networks, mission completed. including institutional development and designing of road Negotiations scheduled resource mobilization, in all aspects of rehabilitation and for February 1992. technical and managerial functions. maintenance programs, Proiect environmental reconnaissance was establishing a training carried out in May/June 1990. program for state Environmental Assessment Category B. personnel, and other specialized activities to be determined during implementation. Federal Ministry 78.0 (R) Agricultural Research - To support Consultants would be Approved by the Execut. of Science and (IDA) institutional development, improvement required to assist in: Directors on June 11, Technology in the research management system, (a) the development and 1991. Credit was signi rehabilitation of research institutes, implementation of on December 6, 1991. staff development and high priority improved research research to improve availability of management systems: (b) appropriate technologies for the major specialized activities farming systems. Environmental to be determined during Assessment Category C. implementation. Federal Government 115.0 (R) State Water - Program of physical Consultants will be Negotiations completed of Nigeria, Kaduna (IDA) rehabilitation, expansion, improved required for engineering Board presentation and Katsina State operation and maintenance practices, design, construction scheduled for March 19 Water Boards investment planning and financial supervision, and management, and manpower development to technical assistance. improve access to public water supply in Kaduna and Katsina States. Environmental Assessment completed. Environmental Assessment Category B. Nigerian National 218.0 Oso Condensate - To develop the Oso To be determined. Approved by the Execut Petroleum (Bank) Field for export production of Directors on April 9, Corporation (NNPC) condensate, through the construction of 1991. various site facilities. Project to be developed as part of a joint venture Retroactive financing between NNPC and MPN (Mobil Producing included in initial dr Nigeria). Environmental Assessment to cover prior cost of completed. Environmental Assessment drilling and field Category A. facilities. Federal Ministry 256.0 Water Rehabilitation - Provision of Contracts for project Approved by the Execut of Water Resources (Bank) funds through FMWR to assist states with management consultants Directors on May 21, (FMWR) rehabilitation of existing water supply have been awarded. FMWR 1991. facilities, provide sector training; has invited proposals (Advance contracting a accounting systems; and technical for engineering 3X of loan amount for assistance. Environmental Assessment services. project management Category C. consultancy services w4 initial financing by Japanese Grant has bee included.) - 29 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project Consulting Servibes Action on Procurement 4 RWANDA ELECTROGAZ About (R) Energy Sector - Rehabilitation MV Consulting services will Project under 46.7 transmission and distribution networks; be required for preparation. Appraisal (IDA) distribution expansion based on policies preparation of terms-of- mission scheduled for to improve affordability; and assistance reference for technical April/May 1992. to ELECTROGAZ in restructuring and works and for An IDA PPF advance of strengthening of power planning. institution US$750,000 was approved Environmental Assessment Category B. strengthening. to finance expenses to complete preparation of project. Ministries of About (R) Agro-Industrial Sector Adjustment - To be determined. Pre-appraisal mission in Plan, Agriculture, 62.5 Will promote market integration and the field. Appraisal Commerce and (IDA) diversification of agro-exports. Will mission scheduled for Industry also increase efficiency of agro- January/February 1992. processing, and improve enabling environment for agro-industrial investment and productions. Environmental Assessment Category C. Central Bank of About (R) Financial Sector - Project would Consulting services will Negotiations completed. Rwanda, Ministry 40.0 support a financial sector program and be required. Board presentation of Finance (IDA) other policy reforms in the incentive scheduled for and regulatory framework to encourage February 25, 1992. private sector investment and exports. Environmental Assessment Category C. Ministry of About (R) Food Security and Social Action Consulting services will Appraisal mission in the Planning 31.8 (formerly Social Action Program) - be required. field. (IDA) Project is a set of poverty-alleviation programs, including: (a) food security and nutrition activities; (b) labor intensive works; and (c) microenterprise development. Project also includes social surveys and socio-economic surveys. Environmental Assessment Category B. SAO TOME & PRINCIPE Social and 6.0 Multi-Sector II - Follow-up to Multi- To be determined. Approved by the Executive Infrastructure (IDA) Sector I, will cover financing to Directors on June 27, Fund infrastructure sector. Environmental 1991. Assessment Category B. Ministries of 8.0 Social Sector - Implementation of a Consultants will be Appraisal mission Health and (IDA) comprehensive malaria control program, required. completed. Negotiations Education supply essential drugs, improvements in tentatively scheduled for primary/secondary education. February 1992. Environmental Assessment Category B. Ministry of 9.8 (R) Agricultural Privatisation and Consultants recruited Negotiations completed. Economic Affairs, (IDA) Smallholder Development (formerly will be for Board presentation Directorate of Agricultural Sector Development) - implementation. scheduled for Agriculture Support of government policy reforms in Consulting services will December 20, 1991. agriculture particularly small farmers be required for land development through land distribution, distribution, and the promotion of food crops. topography, accounting Environmental Assessment Category B. and privatization. - 30 - Member Country, Amount & Implementing Probable Stage of Processing ani Agency Lender 2 Project Consulting Services Action on Procurement SENEGAL To be determined 63.0 Transport SECAL II - Urban and national To be determined. Project being identifii (IDA) road rehabilitation and maintenance, urban transport planning and operational improvements, road safety, and inter- regional transport facilitation. Total project cost is US$80.0 million. Environmental Assessment Category: To Be Determined. To be determined 25.0 (R) Public Works and Employment II - The To be determined. Project to be appraise (IDA) project will finance a second program of January 1992. public works to be carried out by the private sector using labor-intensive techniques to create employment. Total project cost is US$27.7 million. Environmental Assessment Category B. Ministry of 20.0 Urban IV - The project will finance To be determined. Project to be identifi Finance and Plan (IDA) civil works, goods and consultants to execute its three main components: (a) institutional development, including technical assistance, training and equipment; (b) physical Investments, including public infrastructure and facilities; and (c) project management for recurrent costs of project Implementation. Total project cost is US$59.0 million. Environmental Assessment Category A. To be determined 70.0 Public Sector Resources Management - Consulting services will Project to be identifJ (IDA) Policy Reforms encompassing expenditure be required. restructuring in 'priority sectors' health, water, roads, agriculture): improvements in programming and control procedures; streamlining interagency payment systems: and tackling problems of overhang of Government arrears to the private sector. Other actions to be identified. Environmental Assessment Category: To Be Determined. To be determined 20.0 Private Sector Development - Consultants will be Project under (IDA) Continuation of financial sector reforms required. preparation. and establishment of new financing mechanisms for small- and medium- enterprises. Technical assistance to private sector for export promotion and improved management and privatization of existing support services agencies. Policy reforms to improve regulatory environment, including functioning of judicial system. Development of informatics sector. Environmental Assessment Category B. - 31 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lander Project Consulting Services Action on Procurement (Cont'd) Ministere du 15.0 Natural Resources Management - Promotion Consultants will be Project under Developpement (IDA) of policy changes conducive to more required (estimated at preparation. Rural, Ministers sustainable land use throughout the 100 staffweeks). (Co-financing expected de la Protection country, and implementation of land use with CCCE and FAC do la Nature, plans with village and harder (France), and with Ministere des associations. Total project cost Norway.) Resources Animales estimated at US$30.0 million. Project is specifically designed to have a strong Positive environmental impact. Environmental Assessment Category D. Societe Nationale 20.0 (R) Energy II - Project will comprise: Consultants will be Appraisal mission D'Electricite (IDA) (a) a policy reform component (energy required. scheduled for April 1992. (SENELEC) pricing, management of charcoal supply, dissemination of improved cooking stoves, better management of sector entities); and (b) an investment component (time-slice of SENELEC's investment program, fuelwood trade monitoring system, manufacture of improved stoves, etc.) Environmental Assessment Category B. Ministry of Rural 30.0 (R) Agriculture SECAL - Deepen Consultants will be Appraisal rescheduled for Development and (IDA) structural adjustment through further required (estimated at September 1992. Revised SONACOS reforms in pricing policy, marketing and 200 staffveeks). draft Government policy input distribution, credit, natural letter unsatisfactory. resources management and tenure, staff An IDA Project training and career development. Total Preparation Facility project cost estimated at US$100.0 advance of US$500,000 was million. Environmental Assessment approved for project Cateaory C. preparation. (Co-financing expected with CCCE for US$18.5 millioni USAID for US$20.0 million; EEC for US$25.0 million, and KfW for US$11.5 million). Ministry of Rural 30.0 Water III - A five year tranche of Feasibility studies are Negotiations tentatively Development and (IDA) sector investment plan which will completed. Consultants scheduled for April 1992. Hydraulics improve sector management, strengthen for detailed studies and (Co-financing will be financial discipline, reduce sector technical assistance required). dependence on the Government budget, will be required after strengthen sewerage subsector, improve appraisal. rural water supply operation and maintenance, and limit water shortages in the greater Dakar area. Total project cost estimated at US$298.0 million. Environmental Assessment Catexory B. Ministry of 50.0 Human Resources SECAL - The project will To be determined. Preparation under way. Education (IDA) through its policy component, promote increased effectiveness in resources used, improved content and quality of education and better adapt to needs of economy. The project will also, through its investment component improve quality and structure of secondary education, restructure higher education, improve relevance and quality of vocational training. Environmental Assessment Category C. - 32 - Member Country, Amount & Implementing Probable Stage of Processing a Agency Lender 2 Project 3 Consulting Services Action on Procurement SEYCHELLES Ministry of About (R) Infrastructure/Environment - Consultants have been Appraisal mission Planning and 10.0 Extension and rehabilitation of water selected for project scheduled for Februar External Relations (IBRD) supply; road maintenance; and preparation. 1992. Project implementation of Environment Management Preparation Facility Plan. Environmental Assessment Category advance of US$400,000 B. preparation studies h been approved. (Possible financing f the Global Environmen Facility (GEF) -- see Annex C.) SIERRA LEONE Ministry of Works 20.0 (R) Highway Rehabilitation - Consulting services will Project preparation u (IDA) Rehabilitation of gravel and paved be required. way. Appraisal missi roads, and strengthening road scheduled for April 1 maintenance. Environmental Assessment Category B. Ministry of 50.0 (R) Import Support - To cover foreign To be determined. Preparation under way Finance (IDA) exchange costs of critical imports in Appraisal mission agriculture, transport and a structural tentatively scheduled adjustment program under PFP. January 28, 1992. Environmental Assessment Category: To Be Determined. National Power 20.0 Power Rehabilitation - Assist NPA with Consultant services will Negotiations tentatiN Authority (NPA) (IDA) rehabilitation of generation, sub- be required for project scheduled for Februaz transmission and distribution facilities management and technical 1992. Technical in the Western area, and help establish assistance. assistance was financ the basis for NPA to become an under PPF. autonomous and commercially viable utility. Environmental Assessment Category B. TANZANIA TANESCO 10.0 (R) Engineering - Project is a large Consulting services will Negotiations complete (IDA) component of the proposed Power VI be required. Board presentation project, and will include financing of scheduled for Januar3 technical assistance to carry out 1992. detailed design and preparation of bid documents for the Kihansi hydroelectric scheme. Environmental Assessment Category B. Planning 160.0 Public Sector Reform - Adjustment Consulting services will Project under Commission (IDA) operation in support of overall economic be required during preparation. Pre- reform program and, specifically program preparation and appraisal mission of public sector reform. Program would implementation. scheduled for early include budgetary restructuring, including expenditure and tax reform, civil service reform to provide incentives for greater productivity, and public enterprise management reform. Environmental Assessment Category C. - 33 - Member Country, Amount & Implementing Probable Stage of Processing and Agency I Lender 2 Project ' Consulting Services Action on Procurement TANZANIA (Cont'd) Ministry of Trade About Industrial Restructuring - To support Consultancy services Appraisal mission is and Industries 100.0 the restructuring of industrial will be required. scheduled for January l! (IDA) enterprises. Environmental Assessment 1992. Category B. Ministry of Energy 100.0 (R) Energy (Power VI) - Additional power Consultant services will Appraisal mission (IDA) generation scheme and associated be required. scheduled for May 1992. transmission line, rehabilitation of (Co-financing will be existing distribution facilities and required.) some diesel units. Institutional reforms and studies. Environmental studies ongoing. Environmental Assessment Category A. Ministry of Land, 18.3 (R) Forest Resources Management - The Consultants will be Negotiations begin Tourism and (IDA) project would include sectoral policy required. December 9, 1991. Boarq Natural Resources would include sectoral policy and presentation tentativel: institutional reforms, land tenure, land scheduled for March 17, tithing, land use, and pilot woodland 1992. management, agro-forestry and charcoal (Co-financing being production components. Environmental explored.) Assessment Category B. TOGO Regie Nationale 19.0 (R) Second Water Supply - Project would Consulting services will Project has been placed des Eaux du Togo/ (IDA) provide: (a) assistance for water be required for the in the FY95 Lending Direction de resources management; (b) support to rural water sector. Program. Further 1'Hydraulique rural water supply sector for reporting vill be establishing a decentralized village- discontinued. based maintenance system; (c) implementation of policies for delivery of services to urban poor; and (d) financing of a slice of an investment program for expansion of Lome Water facilities. Environmental Assessment Category A. Ministry of 20.0 (R) Lome Urban Development - Project is Consulting services will Project under Equipment and (IDA) designed to: (a) improve sanitary and be required for project preparation. Posts and social conditions in high density areas; implementation. Telecommunications (b) improve basic infrastructures to support the functioning of Lome Urban activities; (c) create a financially viable municipal administrations (d) introduce sound practices in management of the urban environmentl and (e) expand the Social Dimension of Adjustment in the capital city. Environmental Assessment Category B. -34- Member Country, Amount & Implementing Probable Stage of Processing a Agency ' Lender 2 Project 3 Consulting Services Action on Procurement TOGO (Cont'd) Ministere de 27.0 Education III - To strengthen sector Consulting services will Project preparation uz 'Education (IDA) management, improve internal efficiency be required. way. Nationale at de la of educational system, improve resource Recherche allocation and revitalize basic Scientifique education through an emphasis on school level improvement in the quality of teaching and learning. Environmental Assessment Catexory C. Ministry of 20.0 (R) Economic Management - Will include Consulting services will Pre-appraisal mission Planning (IDA) support to the specific action plans for be required. tentatively scheduled three central ministries, civil service February 1992. reform, and macro-modelling in the context of SDA activities. Environmental Assessment Category C. Ministry of Rural 10.5 (R) Agricultural Services Rehabilitation Consulting services may Negotiations schedule Development (IDA) - Reorganization of General Agricultural be required during for January 1992. TL Support Services including technical project implementation. may slip due to polit support services, seed production, turmoil in Togo. applied research and cooperative development. Environmental Assessment Category B. "UGANDA Uganda AIDS 10.0 Uganda AIDS - The project will have To be determined. Identification under Commission (IDA) three main components: (a) institution- al strengthening in areas of policy and program development monitoring and evaluation, equipment and motor vehicles, etc.; (b) civil works - office space; and (c) AIDS action fund for supporting pilot interventions with operations research. Environmental Assessment Category: To Be Determined. Office of the 55.0 (R) Northern Reconstruction - Multi- Consultants have been Negotiations tentativ Prime Minister (IDA) sectoral reconstruction of Northern seleced. scheduled for January Uganda. Environmental Assessment 1992. Cateaory B. Ministry of Works, 60.0 (R) Transport - Project would: Consulting services will Project preparation v Ministry of Local (IDA) (a) assist in rehabilitation and be required for way. Government, and maintenance of highways; (b) improve strengthening MOWTC, Uganda Railways rural feeder road accessibility; MOLG and URC, and Corporation (c) strengthen marine services of Uganda detailed engineering of Railways; and (d) help restore safety roads. provisions at Entebbe Airport. Environmental Assessment Catesorv B. Ministry of 125.0 (R) Structural Adjustment I - To provide To be determined. Approved by the Exact Finance (IDA) support for the Government of Uganda's Directors on Decembei economic reform program with general 1991. Credit was sig import support. Environmental on December 12, 1991. Assessment Category C. - 35 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project s Consulting Services Action on Procurement 4 UGANDA (Cont'd) Ministry of 20.0 (R) Economic and Financial Management - Consultants will be Negotiations tentatively Finance (IDA) Strengthening the capacity of Ministry required. scheduled for of Finance, Ministry of Planning & December 30, 1991. Economic Development, and Bank of Uganda to formulate and implement economic and financial policies. Environmental Assessment Category C. Ministry of About Financial Sector Adjustment Credit I - Consultants will be Pre-appraisal mission Finance (MOF) and 100.0 To provide support for reform of required. tentatively scheduled for Central Bank (BOU) (IDA) financial sector policies and February 1992. restructuring of key financial institutions. Environmental Assessment Category C. Ministry of 65.6 (R) Enterprise Development - Technical Consulting services will Approved by the Executive Finance (IDA) assistance for private sector and public be required. Directors on December 3, enterprise development. Environmental 1991. Credit signing Assessment Category C. scheduled for January 1992. Ministry of 50.0 (R) Education V - Action would support To be determined. Appraisal mission Education (IDA) implementation of education policy completed. Negotiations commission recommendations focussing on tentatively scheduled for basic education reforms, reconstruction March 1992. and quality improvements. Environmental Assessment Category C. Uganda Electricity About (R) Power III - Project's main Consultant services will Approved by the Executive Board (UEB) 125.0 components will consist of an extension be required to supervise Directors on June 13, (IDA) of an existing hydro-electrical power construction. 1991. Following the station, and technical assistance to Donor Meeting of UEB. A sectoral environmental November 5, 1991, funds assessment for future power development are still being sought is planned. Environmental Assessment for consultancy task Category A. (US$20.0 million), dam strengthening (US$12.0 million), or two 40 MW generators (US$18.0 million). Ministry of Health 50.0 Health II - Follow up of Health I To be determined. Project under (IDA) project to further develop rural health preparation. services. Environmental Assessment Category C. Ministry of About (R) Environment - To develop systems for To be determined. Project under Environment 20.0 effective protection of parks and preparation. Major (IDA) reserves and to improve management of delays incurred due to forests and other natural resources. political situation. Environmental Assessment Category D. (Possible financing from the Global Environment Facility (GEF) -- see Annex C.) - 36 - Member Country, Amount & Implementing Probable Stage of Processing a Agency Lender 2 Project s Consulting Services Action on Procurement ZAIRE (Cont'd) Ministry of About (R) Development Management and Consultants will be Post appraisal missic Planning 10.0 Decentralization - Institutional required. tentatively scheduled (IDA) development project focussed on public March 1992. resource management, economic management information system, private sector support, and decentralization. Environmental Assessment Category C. Ministry of Urban About Urban Environment - Project will Consultants will be Negotiations tentatti Development 15.0 include: pilot labor intensive required. scheduled for second (IDA) approaches to maintenance of urban of FY92. Timing will infrastructure and environment; urban reviewed in light of markets; and land registration and land country conditions. taxation reform, environmental studies and technical assistance. Proiect will have positive effect on the urban environment of Kinshasa. Environmental Assessment Category B. ZAMBIA To be determined 14.0 (N) Infrastructure Engineering - To be determined. Pre-appraisal missiol (IDA) Development/rehabilitation of public scheduled for March works, roads, etc. Environmental Assessment Category: To Be Determined. Ministry of 50.0 Export Diversification - The objective To be determined. Project under Agriculture (IDA) is to increase production of preparation. agricultural exports in order to diversify the export base from the heavy dependence on the mining sector. Environmental Assessment Category B. Ministry of 25.0 Education Rehabilitation - Project will Consulting services will Project under General Education, (IDA) provide support for the rehabilita-tion be required for studies preparation. Youth, and Sport of the sector including: construction and long term (MGEYS) and rehabilitation of classrooms; assignments. provision of books and learning materials and, the training of education mangers. It will also institute mechanisms that will prevent further erosion of the sector. Environmental Assessment Category: To Be Determined. Ministry of 20.0 (R) Marketing and Processing - The Consulting services will Project under Agriculture & (IDA) objective is to alleviate policy, be required. preparation. Water Development institutional and physical constraints on agricultural marketing and input distribution. Environmental Assessment Category C. Ministry of 100.0 (R) Privatization and Industrial Consultant services will Appraisal mission Finance (IDA) Recovery - To support institutional and be required. scheduled for Janua policy reforms in trade and public 1992. enterprise restructuring especially the reform of parastatals and the Government's privatization program. Environmental Assessment Category C. - 37 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender I Project 3 Consulting Services Action on Procurement 4 ZAMBIA (Cont'd) Ministry of 100.0 Multisector Adjustment - To extend and Consultant services will Project under Finance (IDA) deepen the Government's adjustment be sought. preparation. program by providing imported goods and (Co-financing will be services, particularly production inputs required.) for recovery. Environmental Assessment Category C. ZIMBABWE Government of 50.0 (R) Agricultural Services - To improve Consulting services Project under Zimbabwe (IDA) income and household goods security (50 staffweeks) will be preparation. among households through reforming required for preparation agricultural marketing, support to and appraisal. research and extension activity, upgrading of livestock support service, and improvement of institutional capacity within the Ministry of Land Agriculture and Rural Resettlement (MLARR). Environmental Assessment Category: To Be Determined. Ministry of 125.0 (R) SAL I - Support for first phase of Consulting services may Staff appraisal report Finance, Economic (Bank) Government's program of economic reform, be required. under preparation. Planning and 50.0 consisting of trade adjustment, domestic Negotiations began on Development (IDA) deregulation, and stabilization December 9, 1991. policies. Environmental Assessment (Co-financing will be Category C. required.) Ministry of 50.0 Education I - Will assist in improving To be determined. Project under Education (IDA) efficiency and quality of secondary preparation. education and in meeting manpower (Co-financing will be requirements in selected fields. required.) Environmental Assessment Category C. Government/ 20.0 Small and Micro Enterprise Development - To be determined. Project under Reserve Bank (Bank) Will provide financial and technical preparation. assistance to small-scale micro (Co-financing will be enterprises and institution building for required.) participating financial intermediaries. Environmental Assessment Cateaory C. Ministry of 30.0 Power Distribution - Reinforcement and Consultants will not be Board presentation Energy/ZESA (Bank) extension of power distribution system required. scheduled for mid-March and public lighting. Environmental 1992. impact is expected to be minimal. (Parallel financing for Environmental Assessment Category B. related investments is being arranged by the Government.) Ministry of Local 52.0 Urban Transportation - Improvement of Consulting services will Project awaiting Government and (Bank) urban transport services through be required. Government response to Rural Development -8.0 assistance to bus companies. issues raised during (IDA) Environmental implications will be appraisal mission. assessed during appraisal and necessary (Co-financing of about actions will be identified. US$25.0 million will be Environmental Assessment Cateaorv B. required). - 38 - Member Country, Amount & Implementing Probable Stage of Processing a Agency ' Lender Project ' Consulting Services Action on Procurement AFRICA REIONAL Governments of 25.0 Regional Power - Develop the hydro Consultants have been Project under Senegal, (IDA) project in Manatali and the associated selected and feasibility preparation. Mauritania and transmission lines to supply Dakar. study is under way. Mali - (OMVS) Environmental Assessment Category A. Organization pour la Mise an Valeur du Fleuve Senegal Governments of 33.4 (R) UDEAC/BEAC - Will support regional To be determined. Second technical Chad, Equatorial (IDA)/ reform program in trade, fiscal workshop, held in Guinea, Cameroon, 130.0 transport and financial policy in Libreville, on tax as Gabon, Central (Bank) countries of UDEAC/BEAC. Objective is trade reforms complel African Republic to tackle problems pertaining to and Congo structure of trade and indirect taxes; transit arrangements for traffic in land locked countries; and the functioning of the central bank that, due to the nature of existing treaties and arrangements between member countries, can only be resolved at the regional level. Environmental Assessment Category C. - 39 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project Consulting Services Action on Procurement II. ASIA REGION BANGLADESH Ministry of Jute 150.0 Jute Development - Restructure jute To be determined. Appraisal mission (IDA) manufacturing industry by downsizing scheduled for first capacity, retrenching excess labor, quarter of FY93. closing uneconomical mills, improving management, privatization and financial restructuring. Environmental Assessment Category: To Be Determined. Ministry of 100.0 Second Industrial Sector Adjustment - Consulting services will Appraised April 1991, but Finance (NBR), (IDA) Would support further liberalization of be required for tariff appraisal report not Commerce, quantitative restrictions on imports, analysis, studies on completed pending Industries the structure of tariff rates, export regulatory constraints -agreement on policy incentives and investment regulatory and fiscal incentives, matrix with new procedures and incentives to facilitate detailing of export Government. Negotiations private sector development. strategy and import tentatively scheduled for Environmental Assessment Category C. inspection. May 1992. Ministry of 50.0 Female Secondary School Assistance - To be determined. Preparation under way. Education (IDA) Project will involve: (a) enhancement (Co-financing interest of educational opportunities for girls expressed by UNDP, through the provision of stipends and Norway, EEC and Germany.) scholarships in Grades 6-12; (b) occupational skills development program; and (c) a public information program. Environmental Assessment Category C. Ministry of Health 50.0 Nutrition - Strengthening of Government To be determined. Preparation under way. and Family and (IDA) and NGO coordination of nutrition (Cofinancing to be Welfare activities through support for: (a) the determined.) development and implementation of community-based nutrition programs; and (b) policy-oriented nutrition research programs. Environmental Assessment Category C. Ministry of 25.0 Technical Assistance VI - Line of credit Consulting services will Appraisal mission Finance (IDA), for financing of feasibility studies be required during scheduled for December that may lend to investment projects for implementation for 1991. Board presentation training and technical assistance project preparation and tentatively scheduled for activities to strengthen the borrower's institutional April 1992. institution and planning capacity. development. Environmental Assessment Category C. Ministry of 40.0 Agricultural Research III - Would Consulting services will Project under Finance (IDA) improve the relevancy of research output be required to assist preparation. through support to institutionalladmini- with preparation and strative restructuring supplementary implementation. infrastructure, equipment and staff training; research initiatives with private sector and contract research funding. Environmental Assessment Category C. - 40 - Member Country, Amount & Implementing Probable Stage of Processing an Agency I Lender Project Consulting Services Action on Procurement BANGLADESH (Cont'd) To be determined 90.0 Power Sector Investment - Will follow up To be determined. Project is in early (IDA) initiatives under previous credit stages of preparation. (ESAC - Cr. 1999-BD), and other sector work activities. Project may also finance a time-slice of Bangladesh Power and Development's investment program. Environmental Assessment Category: To Be Determined. Ministry of 150.0 Financial Sector II - Would focus on To be determined. Project preparation is Finance (IDA) further liberalization of interest early stages. rates, refining policies for loan reclassification and provisions for bad debts, privatization of one or more commercial banks, commercial bank management reforms and capital market reforms. Environmental Assessment Category C. Ministry of 30.0 (R) Forest Resources Management - The To be determined. Appraisal mission Environment and (IDA) project would support: (a) extension of completed. Staff Forest mangrove plantations, industriallenergy appraisal report is plantations and preparation and scheduled for February implementation of forest management 1992. plans for all established plantations and natural forests; (b) investment and planning support for nature conservation areas; and (c) institutional support to the Forest Department, including establishment of an environmental management unit. Environmental Assessment Category B. Bangladesh Water 50.0 Flood Protection I - Would improve Consultants have been Project under Development Board (IDA) protection against damage caused by recruited for preparation. (BWDB) normal bank erosion hazards at selected preparation within (Co-financing needs sites (primarily towns and major ongoing studies. anticipated.) infrastructure), along the Brahmaputra and Meghna rivers by construction of sustainable bank protection and river training works, including repairs or retirement of existing flood control embankments at said locations. Would be subject to limited environmental assessments. Environmental Assessment Category B. Bangladesh Water 90.0 Cyclone Protection II - Would ensure EEC supported Project under Development Board (IDA) improved protection of reclaimed coastal consultants have been preparation. (BWDB), Roads and agricultural lands against tidal recruited for project Highways Dept. inundation and seasonal to medium preparation. (RHD) cyclone tidal surges by repair and upgrading of sea embankments (and their appurtenant structures) by appropriate structural and biological protection measures. The project would also improve evacuation and relief access by construction of several hundred km of all-weather economically justifiable feeder roads. Environmental Assessment Category B. - 41 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project Consulting Services Action on Procurement 4 BANGLADESH (Cont'd) Roads and Highways 75.0 (R) Second Road Rehabilitation and Pre-investment study has Appraisal mission Department (IDA) Maintenance - Rehabilitation or been completed. scheduled for February reconstruction of about 200 km of roads 1992. and periodic maintenance works on about 400 km of other major roads in the northwest and southwest; continued implementation of the action plan for improved road maintenance; and implementation of an action plan to strengthen the construction industry. Total project cost US$126.0 million. No significant environmental impact anticipated. Environmental Assessment Category B. Dhaka Water Supply 90.0 (R) Fourth Dhaka Water/Sanitation - Consultants feasibility Project requires re- and Sewerage (IDA) Project now being re-identified but study (funded by identification based on Authority (DWASA) likely to include: (a) development of Government of France) to results of feasibility long term water source for Dhaka prepare medium/long-term study, which is under (including ground and surface water); investment program for way. (b) rehabilitation and extension of DWASA to be completed (Co-financing interest water distribution and sewerage systems; December 31, 1991. expressed by Japan, Asian (c) extension of water and low-cost Development Bank, and the sanitation program; and (d) further French Government.) institutional development of DWASA. Total cost of first phase of investment program is estimated at US$85.0 million. Positive environmental impact through improved sanitation facilities and rehabilitation of sewage collection treatment works. Environmental Assessment Category B. Chittagong Water 20.0 (R) Chittagong Water Supply and Recruitment of water Appraisal mission Supply & Sewerage (IDA) Sanitation III - Objectives are to supply and sewerage scheduled for January Authority (CWSSA) assist CWSSA to become a more efficient design/supervision 1992. and effective institution through consultants by CWSSA rehabilitation/optimization of existing will commence in 1992. facilities and improved technical, financial, managerial and administrative capabilities. Project has been revised and now includes an institutional reform program to improve CWSSA's financial and operational performance, efforts to reduce unaccounted for water, limited expansion of the water production facilities, extensive rehabilitation of water distribution system, and technical assistance and training. Positive environmental impact by improved sanitation across income groups and by treatment of domestic, commercial and industrial waste water. May required limited involuntary resettlement. Environmental Assessment Catenory B. Bangladesh Bank 50.0 (R) Agricultural and Rural Credit - To Consultants would be Negotiations completed. (IDA) support further reform of agricultural required to assist in Board presentation credit system, strengthen agricultural technical assistance. scheduled for June 1992. financial institutions and to provide (Co-financing from ADB credit for agricultural investments. for US$60.0 million and Environmental Assessment Category B. USAID for US$3.0 million). - 42 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lander 2 Project s Consulting Services Action on Procurement 4 BANGLADESH (Cont'd) Bangladesh Bank 25.0 Private Sector Industrial Credit - ADB-executed UNDP Negotiations tentatively (IDA) Provision of term financing to private technical assistance scheduled for December 9, sector industry through private being undertaken as part 1991. financial institutions to be selected. of project preparation. Environmental Assessment Category B. Ministry of 150.0 Public Resource Management Adjustment - Consulting services will Appraisal mission is in Finance (IDA) To assist in resource mobilization and be required to assist in the field. use. To cover reforms and institutional accounting and budget development in public revenue reform and strengthening mobilization and public expenditure of expenditure planning planning and implementation. activities. Environmental Assessment Category C. Jamuna 105.0 Jamuna Multipurpose Bridge - Consultants will be Economic feasibility of Multipurpose (IDA) Construction of a major multi-purpose required for project the project is being re- Bridge Authority (road-energy telecommunications bridge management and civil examined. Appraisal across the Jamuna (Brahmaputra) River to works supervision. mission to be scheduled. reduce transport costs and support the (Co-financing from ADB Northwest's economic integration with for US$150.0 million; and the rest of the country. Total project Japan). cost estimated at US$528.0 million. Supplementary Environmental studies Procurement: Civil works under way. Some involuntary components to be financed resettlement will be required. by IDA, and cc- Environmental Assessment Category A. financiers. Pre- qualification completed. Bidding documents completed. Bangladesh Power 136.0 Power Rehabilitation and Distribution - Consultants will be Board presentation Development Board (IDA) Project includes: rehabilitation of required for project scheduled for June 23, selected power plants, grid substations implementation. 1992. and transmission lines to restore rated generating capacity/extend plant life and improve system efficiency/reliability of supply; and installation of capacitors in selected areas of distribution system to reduce losses/Lmprove voltage. Environmental Assessment Category B. BOGMC 100.0 (R) Gas Infrastructure - (a) integration Experts an gas network Pre-appraisal mission (IDA) Of gas grid (Bakhrabad-Ashuganj analysis, pipeline scheduled for February pipeline); (b) grid control and engineering and 1992. operations safety systems; (c) further environmental safety appraisal drilling; and (d) technical covered by Japanese assistance in gas network management. Grant Facility. Environmental Assessment Category B. BEUTAN Forest Department 5.0 (R) Third Forestry - To support To be determined. Appraisal mission is (IDA) environmental protection and management, scheduled for April 1992 and improve the sustainability of (Co-£inancing from SDC natural resource use through and collaboration with afforestation of vulnerable roadsides, IFAD possible.) management and protection of forest and grassland areas, and management and restocking of forest areas designated to supply urban, industrial and institutional needs. Environmental Assessment Category D. -43- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project Consulting Services Action on Procurement CHINA Ministry of 150.0 (N) Electronics - Would support the Consulting services will Identification under way. Machinery and (Bank) restructuring of the electronics sector be required for project Electronics within an agreed framework of national preparation and Industry/China strategy. Would assist in build-up of implementation. Electronics the following key infrastructure Corporation elements within the electronics industry: (a) industrial standards and quality control mechanisms: (b) technology assimulation and development and (c) basic electronic components and materials. Environmental Assessment Category B. Ministry of 50.0 (N) Preinvestment and Institutional Consulting services will Project preparation under Finance (IDA) Development - Technical assistance for be required for way. Components of this preparation of projects expected to be implementation of project were previously. financed by the Bank and IDA subprojects. reported under the strengthening of key institutions; and a Technical Cooperation III program of economic studies and Project. training. Environmental Assessment Category C. Taihu Basin 200.0 (R) Taihu Flood Protection - To Consulting services may Project preparation under Authority and (IDA) alleviate severe flood threat in the Tai be required to provide way. Appraisal mission Ministry of Water Lake Basin of Eastern China, through: technical assistance for scheduled for March 1992. Resources canalization of river outlets to Yangtze evaluating hydraulic River, Hangzhou Bay, and East China Sea; design, environmental construction of dikes: and installation assessment, and draft of major pump stations. Environmental specification for Assessment Category A. earthquake dredging. To be determined 100.0 (R) Shenyang Industrial Development Consulting services will Identification under way. (Bank) (formerly Shenyang Engineering Industry) be required for - Assistance to the municipal government preparing subsector in the implementation of its overall development plans. industrial strategy including subsector and restructuring plans in a selected number of subsectors together with associated institution building. The financial intermediaries will assess the environmental impact of all subsector projects to ensure that they are consistent with Bank standards. Environmental Assessment Category B. Ministry of 400.0 (R) Sixth Railway - Project seeks to: Individual consultants Pre-appraisal mission Railways (Bank) (a) support railway policy/system required to provide scheduled for reform (b) support railway investment technical assistance. February/March 1992. plans for capacity expansion and (c) broaden the scope of system-wide technological modernization. The project has three policy components (investment prioritization, tariff restructuring, and financial accounting procedures revision); four investment components (capacity expansion, track maintenance, locomotive and rolling stock maintenance, telecommunications, transport management information system, and pilot container transport): and three project preparation components (railway technology optimization, railway environmental protection, and rail-based container transport). Environmental Assessment Category B. -44- Member Country, Amount & Implementing Probable Stage of Processing an Agency ' Lender 2 Project Consulting Services Action on Procurement CHINA (Cont'd) Liaoning 190.0 (R) Songliao Plain Agricultural Consulting services may Preparation is schedulq Provincial (IDA) Development - Project would assist the be required for for March 1992. Planning and provincial governments in solving irrigation engineering Economic waterlogging, soil salinity and low crop and agro-processing Commission, Jilin productivity problems in approximately during preparation. Provincial 1.2 million ha of land in 40 counties in Planning and Liaoning and Jilin provinces. It would Economic invest in irrigation and drainage Commission facilities, plant windbreaks, provide agricultural inputs, rehabilitate fruit orchards, improve livestock and aquaculture production technologies and promote agro-processing and agro- industries. The project would directly benefit 2.5 million poor farm families. Environmental Assessment Category B. Ministry of 40.0 (R) Technical Cooperation III - Consulting services will Components of this Finance (IDA) Technical assistance for preparation of be required for project will be combin projects expected to be financed by the implementation of with the Preinvestment Bank and IDA. Possible new activities subprojects. and Institutional for project-related technical assistance Development Project. and training, and economic studies. Separate reporting wil Environmental Assessment Category C. be discontinued. Ministry of 15.0 (R) Ships' Wastes Disposal - Will assist Consulting services will Appraisal under way. Communications, (IDA) the ports of Dalian, Tianjin, Shanghai, be required, and Negotiations tentative Six Port Ningbo, Guangzhou and Kiamen in setting includes about scheduled for Authorities up facilities for the reception and safe US$0.73 million of February 26, 1992. disposal of ships' wastes. Will assist technical assistance and in development of a plan for dealing studies. (Possible financing fx with oil spill contingencies, the Global Environment Environmental Assessment Category B. Facility (GEF) -- see Annex C.) Henan Province 120.0 (R) Henan Province Road Transport Consultants currently in Appraisal report undei Communications (Bank) Development - To support highway the field to review preparation. Department (HPCD) development objectives of the Eighth design and final Plan (1991-1995) for the Henan Province engineering for - with two key elements: (a) integrated Zhengzhou-Louyang development of road system in the expressway and selected Northwestern region of Henan province, provincial roads. centered on the Zhengzhou-Louyang Corridor; and (b) institutional support and strengthening of highway organizations in the province. Environmental Assessment Category A. Ministry of 400.0 (R) Grain Distribution - A program of Project preparation Project issues raised Commerce (Bank)/ investments in grain distribution, likely to require Preparation I mission (IDA) markets, handling, transport, and consultants in under consideration b storage facilities required to support a management of commodity the Government. changing role of Government agencies markets and food buffer Preparation II missia from basic supply of grain, to stocks, modern grain scheduled for Februar management of competitive wholesale storage technologies, 1992. markets and strategic reserves and planning of logistics of buffer stocks. Environmental Assessment grain and fertilizer Category: To Be Determined. distribution, and computerized information systems for bulk logistics, and commodity markets. -45- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project 3 Consulting Services Action on Procurement cBN (Cont'd) Sichuan Petroleum 150.0 Sichuan Gas Development and Conservation To be determined. Project preparation unde Administration (Bank) - To support Sichuan gas exploration, way. development, aging field rehabilitation, transmission, distribution, energy conservation and pollution abatement for selected fertilizer plants. Environmental Assessment Category A. Ministry of Water 150.0 Loess Plateau - Agricultural To be determined. Study mission report due Resources (IDA) productivity would be improved and end December 1991. environmental degradation reversed in eight tributaries of the Yellow River in the Loess Plateau area through: (a) construction of terraced crop land, small soil dams and other erosion control works; (b) establishment of pasture, shrubs and trees on steeply sloped land; and (c) improved management of communal grazing lands. Project would improve productivity and incomes of 1.3 million absolute poor and curtail soil erosion from 39,000 sq. km catchment area. Environmental Assessment Category B. Ministry of 185.0 Second Red Soils Land Rehabilitation - .,To be determined. FAO/CP preparation Agriculture (IDA) Disseminate techniques of ecologically mission scheduled for sustainable and economically viable land. March 1992. rehabilitation and voluntary settlement over a wide area of degraded red soils across Jiangxi, Fujian, Human, Zhejiang and Guangxi--and technical assistance to support research and strengthen extension systems. Environmental Assessment Categories BD. Ministry of 110.0 (R) Agricultural Support Services - The To be determined. Follow-up mission Agriculture (IDA) project would support the production of scheduled for March 1992 foodgrains, oil crops, cotton and Review of MIS and livestock through improvement of support institutional aspects to services to farmers--crop, livestock, be provided by UNDP regulatory and management services, and umbrella project. project management. Services to be emphasized would be applied research, agricultural extension, seed production, veterinary and quarantine. Environmental Assessment Category C. .Sichuan Province 143.0 (R) Sichuan Agricultural Development - Consulting services Appraisal report under Planning (IDA) To support comprehensive agricultural likely to be required preparation. Commission development in Sichuan Province focusing for training and on irrigation, soil conservation, technical assistance Retroactive financinS of sericulture, livestock, and agro- during project up to US$14.0 million processing including a strong poverty implementation. recuested. alleviation component, with particular emphasis on the role of women. A detailed environmental assessment is being completed by the Sichuan Environmental Research Institute for Environmental Protection. Environmental Assessment Category B. -46- Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 1 Project ' Consulting Services Action on Procurement 4 CHIRA (Cont,d) Ministry of Public 129.6 (R) Infectious and Endemic Disease Consulting services Approved by the Executi Health (IDA) Control - Control and reduction of likely to be required Directors on December 1 schistosomiasis and tuberculosis. for operational research 1991. Environmental Assessment Category C. during project implementation. People's Bank of 50.0 Financial Sector Technical Assistance - Consulting services Appraisal report under China (PBC)/ (IDA) To support PBC's central banking required for project preparation. Ministry of functions and strengthen financial preparation and Finance sector development through possible implementation. components for improving bank regulation, supervision and accounting, payments and clearing system, legal framework, research and statistics and domestic debt management. Environmental Assessment Category C. Guangdong Province 270.0 Guangdong Provincial Transport - Would To be determined. Preparation under way. Planning (Bank) focus on highway -- new construction of Commission perhaps two major expressways, upgrading and rehabilitation of secondary roads. Environmental Assessment Category A. Liaoning 150.0 (R) Liaoning Environment (formerly Consultants required for Preparation under way. Environmental (Bank)/ Liaoning Environmental) - Continuing project preparation. Protection Bureau; (IDA) support to improve water management and Liaoning water pollution control in the Hun/Taizi Construction River Basin; consists of physical and Commission institutional development for works for waste water and hazardous waste management for the cities of Shenyang, Fushun and Anshan. Environmental Assessment Category D. Shanghai Port 150.0 (R) Shanghai Port VIII (formerly To be determined. Pre-appraisal mission. Authority/ (Bank) Shanghai Port III) - Rehabilitation and completed. Ministry of expansion of port and cargo handling Communications facilities at Shanghai. Environmental Assessment Category A. State Education 132.5 (R) Education Development in Poor Consultants required for Negotiations completed Commission (IDA) Provinces - To support local efforts improving planning of Board presentation aimed at improving efficiency and higher education, tentatively scheduled quality of education in six provinces; training of teachers in April 14, 1992. Shaanxi, Guizhou, Hubei, Yunnan, Hunan science, and management and Shanxi. Environmental Assessment information system. Category C. State Education 150.0 Effective Teachers Services - Support Consultants are likely Preparation under way. Commission (IDA) reform of teacher education for lower to be required for middle school teachers and for primary technical assistance in school teachers in under-privileged teacher education and areas, including curriculum reform, instructional methods. development and dissemination of innovative teaching methods, improved efficiency and control through modern management and information systems, and upgrading of facilities and equipment. Environmental Assessment Category C. -47- Member Country, Amount & Implementing Probable Stage of Processing an Agency Lender Project Consulting Services Action on Procurement CHIRA (Cont'd) National Project 110.0 (R) Rural Water Supply and Sanitation - Consultants required for Negotiations scheduled Office Under the (IDA) To improve rural productivity and technical assistance and for December 16, 1991. National Patriotic health, particularly in poor, remote training in project Financing of consultant Health Campaign areas, by increasing coverage of water preparation and for first phase project Committee supply and sanitation. The project implementation. preparation provided b) would provide potable water to about UNDP umbrella project. 9 million rural inhabitants in 75 Further UNDP assistance counties of 6 of China's poorest for capacity building provinces. Project would also provide approved August 1991. funds for water quality monitoring, demonstration and communal/public Retroactive financing c latrines and health education in the up to US$11.0 million project areas. Environmental Assessment recuested. Category B. Planning and 150.0 Southern Jiangsu Environment - To Consultants have been Preparation under way. Economic (Bank) support investments in urban and selected. Two studies Commission of industrial projects that demonstrate are being financed under Jiangsu Province significant environmental payoffs and to the Japanese T.A. Grant strengthen institutional, regulatory and Facility. environmental management capabilities of the provincial agencies. Environmental Assessment Category D. Ministry of Public 180.0 (R) Rural Health Manpower Development Consulting services may Pre-appraisal mission Health (IDA) (Health IV) (formerly Rural Health r be required during completed. Appraisal Manpower Development) - Assistance in project implementation. mission tentatively training and re-training rural health scheduled for May 1992. manpower in the poorest counties of five provinces. Environmental Assessment Category C. Ministry of 150.0 Fertilizer and General Process Equipment Consultants will be Preparation under way. Machinery and (Bank) Manufacturing - Restructuring of the required for project Electronics fertilizer and general process equipment preparation and related Industry manufacturing industry and selected sector study for which enterprises to enable them to upgrade the terms of reference their products and improve their have been finalized. efficiency. Environmental Assessment Financing arrangements Category A. are being made. Invitations for proposals are expected to be issued after decision on financing arrangements. Beijing Municipal 125.0 Beijing Environment - Physical works and Consultants required to Negotiations completed Environmental (Bank)/ institutional strengthening to address assist in detailed Approved by the Execut: Protection Bureau (IDA) air and water pollution solid waste and design, preparation of Directors on November hazardous waste problems in Beijing city contract documents, and 1991. arising from industrial and domestic assist in conducting waste water, solid and toxic wastes project related studies. Procurement: Advance discharges and burning of low grade procurement for coal. Project will assist municipality consulting services as to strengthen environmental policies and construction of about pollution control. Environmental 5 km of district heatii Assessment Catemorv D. pipeline. Retroactive financing requested for n to US$12.5 million. - 48 - Member Country, Amount & Implementing Probable Stage of Processing ar Agency 1 Lender 2 Project Consulting Services Action on Procurement CBINA (Cont'd) Changchun 120.0 (R) Changchun Environment and Water Consultants are Appraisal mission Municipal Planning (IDA) Supply - To provide water supply to finalizing feasibility scheduled for May 1992 Commission relieve serious shortages, and to plan studies. for appropriate disposal of waste water. Environmental Assessment Category B. Yellow River 300.0 (R) Xiaolangdi Multipurpose - To Consulting services for Dam and Environmental Conservancy (Bank)/ construct major dam (Xiaolangdi) on construction supervision panels will be visitir Commission (IDA) Yellow River to provide protection for will be required. the project in early 2 100 million people from catastrophic to review the technics floods for North China Plain, alleviate and economic assessmer siltation and aggradation of river by the consultants. channel, provide irrigation water to over one million ha of farmland, provide municipal and industrial water throughout the region, and generate electric power. There is a resettlement component involving about 167,000 people to be resettled over a 20 year period. Detailed plans have been prepared, and a pilot resettlement site is being prepared for construction in 1992. Potential environmental impact currently being reviewed. Environmental Assessment Category A. Tianjin 100.0 Tianjin Industrial Development II - Consultants are Preparation under way. Municipality and (Bank) Assistance to the municipal government preparing sub-sector China Investment in the implementation of its overall development plans. Bank industrial strategy including subsector and restructuring plans in a selected number of industries together with associated institution building. The financial intermediaries will assess the environmental impact of all subsector projects to ensure that they are consistent with Bank standards. Environmental Assessment Category B. Shanghai Municipal 150.0 Shanghai Industrial Efficiency - Consultants required to Preparation under way Government (Bank) Assistance to the municipal government help prepare sub-sector in the implementation of its overall development plans. industrial strategy including development and restructuring plans in a selected number of subsectors together with associated institution building. The financial intermediaries will assess the environmental impact of all subsector projects to ensure that they are consistent with Bank standards. Environmental Assessment Category B. Zhejiang Province 220.0 (R) Zhejiang Provincial Highway - Consultants have been Appraisal report unde Communications (Bank) Provincial transport, including recruited for the review preparation. Department Hangzhou-Ningbo Highway. Environmental of highway design. Assessment Category A. Consultants will be Retroactive financin recruited for about USS4.0 million, construction expenditures on desii supervision. and the initial cost i construction of a sho: section of the hishwa. reauested. -49 - Member Country, Amount & Implementing Probable Stage of Processing and Agency.' Lender * Project 3 Consulting Services Action on Procurement 4 CHINA (Cont'd) Guangdong 162.0 Guangdong Agriculture Development - Consultants have been Approved by the Executiv Provincial (IDA) Includes development of marine fishing hired. Directors on November 5, Government/ within 200 mile Extended Economic Zone, 1991. Guangzhou aquaculture, mariculture, land Municipal reclamation, fruit development, and Retroactive financing of Government agroprocessing. A detailed US$12.8 million for environmental assessment has been initial civil works completed by Zhongshan University and is approved. acceptable. Environmental Assessment Category B. Ministry of 300.0 (R) Zouxian Thermal Power - Construction Consultants are already Appraisal report under Energyl (Bank) of two generating units of 600 MW each in place. preparation. Shandong and associated transmission lines and Provincial substations, and technical assistance Procurement: Advance Electric Power including a study of air quality impact procurement required for Bureau of thermal power plants in China's boilers and auxiliaries, coastal region. Environmental impact turbine auxiliaries, and statement has been reviewed by the Bank. other electrical and The analysis indicated that the project mechanical equipment fox will meet World Bank's guidelines and two 600-MW coal-fired all applicable Chinese environmental generating units. norms. Environmental Assessment Category A. Ministry of Energy 120.0 (R) Shuikou Hydro Power II - Second Consultants advisory Appraisal report under (Bank) phase construction of dam and services will be preparation. powerhouse. Program to enhance required. resettlement and environmental management are currently being executed under the existing loan. Environmental Assessment Category A. Tianjin Municipal 100.0 Tianjin Urban Development and Consultants have been Appraisal report under Government (IDA) Environment - To improve municipal recruited for preparation. planning, environmental sanitation, and preparation of detailed transport. Environmental Assessment design and bid Category B. documents. Shanghai Municipal 150.0 (R) Shanghai Environment (formerly Consultants required for Preparation under way. Government (Bank)/ Shanghai Environmental) - Continuing project preparation. (IDA) program to improve water supply sewerage and environmental pollution control in the city of Shanghai. Environmental Assessment Category D. State 81.8 (R) Regional Cement - To establish a new Consultants have Negotiations are Administration for (Bank) high strength cement plant based on provided technical tentatively scheduled f. Building Materials regional cooperation in the Shanghai assistance for January 1992. Industry Economic Region; rehabilitate an engineering design. existing cement plant and provide Procurement: Key tende technical assistance for design and packages have been research capabilities of local cement- issued. related institutes. Plant design changes have been agreed to enhance de- dusting capacities to meet stricter environmental standards. Agreement has been obtained that asbestos cement will not be used for plant construction. Environmental Assessment Category A. - 50 - Member Country, Amount & Implementing Probable Stage of Processing a Agency ' Lender Project s Consulting Services Action on Procurement CHIRA (Cont'd) Ministry of 180.0 Yanshi Thermal Power - Construction of 2 Consultants are in Updating of documents Energy/Henan (Bank) x 300 MW coal-fired thermal power units place. under way. Board Provincial located at Yanshi in the vicinity of presentation tentativq Electric Power coal mines in Henan province. Project scheduled for January Bureau design conforms to internationally 1992. accepted environmental norms. Agreement has been reached that the owner will Procurement: Advance take appropriate steps to implement an procurement is in pro. environmental program agreed with the for steam turbine Bank. Environmental Assessment Category generators and boiler A. for two 300 MW coal f generating units. Hainan Electric 67.0 (R) Daguangba-Hainan - Provide power, Consulting services for Approved by the Execu Power Company (Bank)/ irrigation and improved water supply to technical assistance Directors on October (IDA) economically backward southwest area of will be required. 1991. Loan/credit wa Hainan Island. In addition, technical signed on November 22 assistance and training will be 1991. provided. Project includes programs to enhance resettlement and environmental Procurement: Advance activities. Environmental Assessment procurement is in pro Category A. for urgently needed materials (steel, cam and timber) and consulting services. Retroactive financing up to USS6.7 million been requested. Urban Development 150.0 (R) Zhejiang Multi-Cities - Provision of Infrastructure and urban Appraisal mission Project Office of (IDA) urban services, in particular water consultants submitted scheduled for January Zhejiang Province supply, liquid and solid waste their field reports. 1992. management, land development scheme in Consultant services will Shaoxing city, improve public transport be required for and traffic management in Hangzhou, technical assistance improve institutional strength and during project financial performance in urban services, implementation. Environmental Assessment Category B. Jiangsu Province 100.0 Jiangsu Chemical Sector - Support Consultants have been Negotiations are (Bank) development of provincial chemical hired to assist in tentatively scheduled industry, including associated technology January 1992. institution building. All subprojects identification. will be sublect to government of China's Consultants are being environmental impact assessment process recruited for various which is satisfactory. Project will technical assistance also establish a center to oversee activities. hazardous and toxic waste management in Jiangsu. Environmental Assessment Category B. Ministry of 250.0 Finance I - Loan for development of two To be determined. Project preparation Finance (Bank) major financial institutions (Bank of. delayed, pending the Communications and Construction Bank of preparation of a China); and technical assistance to the technical assistance Ministry of Finance. Environmental project for People's Assessment Category C. of China. - 51 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender2 Project Consulting Services Action on Procurement FIJI To be determined 10.0 (R) Energy Sector - Scope of project to To be determined. Project has been removed (Bank) be determined. Environmental Assessment from the Lending Progran Category: To Be Determined. Further reporting will b discontinued. Ministry of 20.0 (R) Roads - Upgrading of several high Consulting services will Joint appraisal mission Infrastructure and (Bank) priority sections of the road network; be required for with ADB scheduled for Public Utilities improving road management, particularly technical assistance in February 1992. road maintenance; and institutional road management, strengthening. Environmental Assessment detailed engineering for Category B. selected road sections, construction supervision, and for institutional strengthening. INDIA Sardar Sarovar 225.0 (R) Sardar Sarovar Canals II - Project To be determined. IEPS is under Narmada Nigam, (Bank) provides funding for construction of preparation. Further Ltd. 150.0 water delivery and drainage works of the Bank processing awaits (IDA) ongoing 1.9 m ha Sardar Sarovar Project completion of the Morse (SSP). Its components include: Team review of SSP's unfunded segments of main and branch ongoing resettlement and canals and minor network blocks; canal rehabilitation and hydro generation and pump plants; canal environmental components operations control and communication under Cr. 1552/Ln. 2497- equipment; and training and technical IN (dam and power) and assistance. Environmental Assessment Cr. 1553-IN (Water Category A. Delivery and Drainage. Oil and Natural 150.0 Oil and Gas Development II - The primary To be determined. Project is in the Gas Commission (Bank) objective would be to provide technical preparation stage. (ONGC) and financial support to ONGC for speeding up the development of its oilfields with the help of joint ventures. The second objective would be to assist the Government in the implementation of further reforms in the oil and gas sectors that would give commercial considerations more weight in the decisions taken in these sectors. Environmental Assessment Category A. Governments of 70.1 Agriculture Development III - Project To be determined. Project is in pre- Assam and Madhya (Bank)/ would promote improved strategy for feasibility stage. Pradesh 8.0 development and rationalization of (IDA) public expenditures in agriculture. Project would also finance selected public investments. Environmental Assessment Category B. Ministry of 150.0 (R) Rubber - Project would expand rubber To be determined. Pre-appraisal mission is Commerce, Rubber (Bank)/ sector through: (a) replanting of old in the field. Board, Government (IDA) low yielding rubber (40,000 ha); (b) new of India rubber plantings (30,000 ha); (c) productivity enhancement on existing rubber small holdings (60,000 ha); (d) support for establishment of new rubber processing factories; and (e) institutional support for research, training, tribal development and monitoring and evaluation. Environmental Assessment Category B. - 52 - Member Country, Amount & Implementing Probable Stage of Processing ax Agency Lender 2 Project Consulting Services Action on Procurement INDIA (Cont-d) To be determined 200.0 (R) National Renewal Fund - Assistance To be determined. Pre-appraisal mission (IDA) for strengthening social safety nets tentatively scheduled related to the potential consequence of January 1992. adjustment. Environmental Assessment Category C. Department of 125.0 Nutrition III - Project will further To be determined. Project not yet Women Welfare and (IDA) strengthen integrated child development identified. Child Development, services. Environmental Assessment Ministry of Human Category C. Resource Development Directorate 150.0 Tropical Disease Control I - Project To be determined. Initial preparation I General of Health (IDA) would develop a leprosy control under way. Services, Ministry intervention in selected districts of Health & Family targeting an expected caseload of Welfare 1.5 million individuals. Would also provide for multi-drug therapy, health education, training, infrastructure, disability care, and support to information. Environmental Assessment Category C. Reserve Bank of 300.0 (R) Financial Sector Adjustment II - To be determined. Initiating Memorandun India (Bank) Project will support the financial be issued in June 19S system reform program comprising further deregulation of interest rates, lowering reserve requirements and priority sector lending targets for commercial banks. Project would also assist commercial banks in clearing up their portfolios and recapitalizing increasing operational autonomy for commercial banks and introducing competition and improving prudential supervision and financial disclosure standards. Environmental Assessment Category C. Ministry of 400.0 (R) Trade Adjustment I - This is a Consulting services will Pre-appraisal missioi Finance (Bank) policy based operation which aims at probably not be scheduled for June 1 supporting India's trade liberalization required. policy. Environmental Assessment Category N/A. Nodal agency not 300.0 Public Enterprises/Private Sector Consulting services will Dialogue is continui yet determined (Bank) Development I - To support the be required for the enabling policy Government's efforts at reform of restructuring planning. environment. central public sector enterprises Restructuring studie (CPEs). The enabling policy environment currently under way seeks to induce greater efficiency in number of selected C CPEs through inter alia divestiture and elimination of budgetary supports. The project will include adjustment actions at the enterprise level, including restructuring, workouts, divestitures, etc. Environmental Assessment Category B. - 53 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement 4 INDIA (Cont,d) Ministry of Health 65.0 (R) National AIDS Prevention and Control To be determined. Staff appraisal report to and Family Welfare (IDA) - The purpose of the project is to be issued mid-December initiate a major effort in AIDS 1991. prevention. The project would constitute a start up investment to launch expanded control activities related to institutional development, surveillance, blood safety, and information and education. The ultimate objective would be to slow the spread of human immunodeficiency virus so as to reduce future morbidity, mortality and impact of AIDS. Environmental Assessment Category C. Department of 250.0 (R) SAL I - Support for Government's Consulting services Approved by the Executive Economic Affairs, (Bank)/ stabilization and adjustment program, vill not be required. Directors on December 5, Ministry of 250.0 focusing mainly on reforms in industrial 1991. Loan/credit was Finance (IDA) regulation, trade, public enterprises signed on December 5, and the financial sector. Project to be 1991. undertaken in conjunction with an IMF program. Environmental Assessment Category C. NPTC/ 250.0 Electric Power Systems - Policy changes To be determined. Project preparation just NTPC (Bank) and regulatory reforms to rationalize beginning. power bulk supply and trade, and to fund core components of the investment programs of the National Thermal Power Corporation (NTPC) and possibly the National Power Transmission Corporation (NPTC). Environmental Assessment Category B. Maharashtra State 250.0 Maharashtra Power II - Seventh unit (500 To be determined. Project in late stage of Electricity Board (Bank) MW) of Chandrapur (a mine-mouth, coal- preparation. (MSEB)/Government based power station), and a 735 km HVDC of Maharashtra transmission line to improve the reliability and efficiency of the state supply system, and to bring forward institutional and policy reforms in Maharashtra, including a larger private sector role in power. Environmental Assessment Category A. State Department 25.0 Water Resources Consolidation - To To be determined. Preparation planned to of Irrigation (Bank)/ support a state level investment program begin February 1992. (state to be 125.0 to improve performance of irrigation and determined) (IDA) exploit viable sources of expansion of irrigation and drainage; improving operations and maintenance, completion and rehabilitation of irrigation schemes, and institutional reform and improved functions of the state Irrigation Departments. Environmental Assessment Category: To Be Determined. -54- Member Country, Amount & Implementing Probable Stage of Processing Agency Lander Project Consulting Services Action on Procuremen INDIA (Conted) Government of 100.0 UP Sodic - Project would reclaim about To be determined. The project, which ii Uttar Pradesh (IDA) 60,000 ha of sodic land in about 10 being prepared by 001 districts, focusing mainly on privately is in late stage of owned lands to bring them to double- preparation. cropped irrigated arable production, and includes fruit tree planting and pasture Procurement: To be development on about 25,000 ha of determined. community land. Environmental Assessment Category B. Government of 45.0 Bihar Plateau - Project would strengthen To be determined. The project is being Bihar (Bank) GOB's development planning and prepared by the 75.0 evaluation capabilities, identify and Government of Bihar (IDA) support the potential development of Bank support. hydro power generation and minor irrigation for increased agricultural Procurement: To be production in mostly tribal areas, determined. Improve village water supply and rural road communication and involve local NGOs in the selection of beneficiary activities and assist in their implementation. The project would also provide seasonal credit to promote the update of technological packages to improve productivity, and create employment opportunities for women. Environmental Assessment Category: To Be Determined. Govt. of Karnataka 65.0 (R) Agriculture Development II - Promote To be determined. Pre-appraisal missic and Rajasthan (Bank) improved strategy for development and in the field. 85.0 rationalization of public expenditures (IDA) in agriculture in Karnataka and Rajasthan. Help finance the Governments of Karnataka and Rajasthan plan expenditures in priority subsector consistent with an acceptable agricultural strategy. Environmental Assessment Category B. West Bengal Forest 33.5 (R) West Bengal Forestry - To initate Limited technical Negotiations began i Department (IDA) comprehensive approach to forest assistance required in December 2, 1991. resource management in West Bengal in the field of forestry environmentally sound way, mainly in the research, seed handling, Retroactive financ field of afforestation, horticulture and propagation and fodder up to USS3.3 millio: silvi pasture development on degraded grasses. proposed mainly for forest land; regeneration of degraded plantation establis sal forests, wildlife sanctuary improvements; farm forestry; nursery development seed production, and adaptive forestry research. Would include vegatative soil and moisture conservation measures. Institutional strengthening provided to rationalize forest administration, support NGO's and strengthen the village level Forest Protection Committees. Improvements in monitoring forest resources and Improving production/ marketing linkages between the forest department, farm forest producers and wood industries. Environmental Assessment Category D. - 55 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project Consulting Services Action on Procurement 4 INDIA (Cont,d) Department of About (R) Karnataka Rural Water Supply & Consultants have been Pre-appraisal scheduled Rural Development, 80.0 Environmental Sanitation - Would improve recruited. for February/March 1992. Government of (IDA) health and productivity in rural areas India through provision of rural water supply, environmental sanitation and health education services in Karnataka. Proiect would focus on imroving environmental sanitation. Environmental Assessment Category B. Ministry of 200.0 (R) Port Modernization - Project will To be determined. Draft preparatory study Surface Transport (Bank) focus on part modernization and expected shortly. Final productivity improvements with no major report expected January new construction works. Environmental 1992. Assessment Category B. (Partial Global Environmental Facility funding being sought for part hazardous waste component.) Ministry of 80.0 (R) Industrial Pollution Control II - To be determined. Identification mission Environment & (Bank) Set up toxic and hazardous industrial tentatively scheduled for Forests 30.0 waste minimization program. Other April 1992. (IDA) objectives include: (a) promoting effective and timely application of environmental legislation regarding the generation, disposal and release of toxic and hazardous materials: (b) supporting efforts by industry to prevent generation or encourage recycle of hazardous materials or to properly treat and dispose of toxic substances: and (c) promoting development and application of novel techniques for minimization of toxic and hazardous waste material. Project will continue the program of support to the development of the enforcement and monitoring institutions initiated in the Industrial Pollution Control Project. Environmental Assessment Category D. Ministry of Health 214.0 Health I (MCH) - Project would support No expatriate Approved by the Executive and Family Welfare (IDA) national maternal-child health (MCH) consultants required. Directors on program through support for equipment, September 17, 1991. supplies, training and management components. Total project cost is Retroactive financing of estimated at US$329.6 million. up to US$21.0 million is Environmental Assessment Category C. recommended to cover eligible exoenditures after November 30. 1990. Irrigation 50.0 Subernarekha Multi-Purpose II (Bihar) - To be determined. Further project Department, (IDA)/ A follow-up project to complete dam and processing contingent Government of 100.0 canal construction establish irrigation upon tangible proof of Bihar (Bank) system for about 160,000 ha, support on . satisfactory farm development activities, provide implementation of agricultural support services, improve resettlement plans. environmental protection, support some resettlement and rehabilitation activities for displaced families as a result of dam and canal construction, supply water for municipality and industrial use and generate hydropower for industrial use. An environmental imnact assessment is under preparation. Environmental Assessment Catemorv A. - 56 - Member Country, Amount & Implementing Probable Stage of Processing i Agency Lender Project ' Consulting Services Action on Procurement INDIA (Cont'd) Ministry of 300.0 Railways Productivity Improvement - The Consultants expected to Appraisal report unde Railways, (Bank) project would support the efforts of be used for: preparation. Government of Indian Railways to accelerate intro- (a) a techno-economic India duction and dissemination of more cost- study (to be funded by efficient and less polluting locomotives Indian Railways); and and modern higher capacity freight (b) management wagons and coaches and to Improve the accounting. efficiency of their production, maintenance and operation. Environmental Assessment Category C. Department of Non- 120.0 (R) Renewable Energy Development - Consultants will be Pre-appraisal of mini Conventional (Bank) Construction of about 45 mini hydro retained to assist in hydro and TNPL compor Energy Sources; plants (for a total capacity of 110 MW) project preparation. completed. Preparat] Indian Renewable on existing irrigation canals, and of vindfarm and solai Energy Development promotion of other alternative energy photovoltaic componer Agency; and Tamil development activities. Also, expansion under way. Nadu Newsprint and of TNPL's plant for bagasse-based (Co-financing of abot Paper Limited newsprint. Environmental Assessment US$30.0 million has I (TNPL) Category A. proposed from the G14 Environment Facility (GEF) -- see Annex C, Department of 170.0 (R) First Primary Education - Project No expatriate Pre-appraisal missic Education; (IDA) would be implemented in selected consultants required. scheduled for June 11 Ministry of Human districts of Uttar Pradesh and would Resource address issues of enrollment of girls Development and quality and efficiency improvement Department of through teacher training, curriculum Education, improvement, supply of materials, Government of improvements in teacher utilization and Uttar Pradesh low-cost school construction. Estimated project cost US$370 million. Environmental Assessment Category C. Departments of 125.0 (R) Integrated Child Development No expatriate Pre-appraisal missio: Women and Child (IDA) Services II - Project would aim to consultants required. completed. Appraise Developments; improve health and nutritional status of mission scheduled fo Governments of pre-school children, pregnant women and late February 1992. India and Madhya lactating mothers by means of improved Pradesh; health services, nutritional Department of supplementation and health education Welfare, through the Integrated Child Development Government of Services Program. Environmental Bihar Assessment Category C. Municipal Health 100.0 (R) Population VIII - Project would No expatriate Pre-appraisal missio Departments of (IDA) support strengthening of family welfare consultants required. the field December 1 Hyderabad, (family planning and maternal-child 1991. Calcutta, health) services in slum areas of Bangalore, municipalities through establishment and Ahmadabad, Kanpur staffing of urban health posts and and other cities support for training, communication and improved management components under the family welfare urban revamping scheme. Environmental Assessment Category C. - 57 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lander 2 Project Consulting Services Action on Procurement 4 INDIA (Cont'd) Ministry of Human 307.1 (R) Technician Education II - Project No expatriate Approved by the Executive Resources (IDA) would include capacity expansion of consultants required. Directors on March 28, Development, existing and construction of some new 1991. Signing scheduled Government of polytechnics; modernization of for December 16, 1991. India; Departments polytechnic equipment and facilities; of Education, and training and institutional States of Andhra strengthening in eight States and one Pradesh, union territory. Project cost is Maharashtra, Tamil estimated at US$362.1 million. Nadu, West Bengal, Environmental Assessment Category C. Panjab, Haryana, Assam and Himadral Pradesh and Union Territory of Delhi Madras 25.0 (R) Madras Water Supply and Sanitation Consultants have been Appraisal misson delayed Metropolitan Water (Bank) II - Project would support major retained to assist with until the availability of Supply and 200.0 expansion of water supply and extension project preparation. water is assured. Sanitation Board (IDA) and operational improvements of sewage (Metrowater) collection and disposal. It would also finance an environmental sanitation program and institutional development. Environmental Assessment Category B. Municipal 50.0 Bombay Sewage Disposal - Would finance Expatriate consultants Appraisal mission planned Corporation of (Bank) construction of two 3-km marine outfalls have been retained to for September 1992. Greater Bombay 50.0 and two aerated lagoons. Technical assist with project (IDA) assistance would be included for preparation. construction supervision. Total project cost estimated at US$143.0 million. Environmental Assessment Category A. Industrial 300.0 Financial Sector Adjustment I - Loan to To be determined. Appraisal mission Development Bank (Bank) strengthen development finance scheduled for of India (IDBI); 100.0 institutions by helping them to restore January 1992. Industrial Credit (IDA) their problem portfolio, and implement and Investment prudential guidelines to ensure future Corporation of health, autonomy and competition within India (ICICI); and the sector. Environmental Assessment Industrial Finance Category C. Corporation of India (IFCI) Ministry of Water 110.0 (R) Narmada River Basin Development - Studies on environmental Staff appraisal report Resource (IDA) Assistance for catchment treatment in issues and water scheduled for December (Narmada Control the Sardar Sarovar Project catchment modelling. Also, 1991. Board presentation Authority), State area, in Madhya Pradesh (M.P.); and in technical assistance for tentatively scheduled for Governments of the middle Narmada basin. Assistance fisheries and April 1992. Madya Pradesh, for fisheries development in the Sardar participatory rural Gujarat and Sarovar reservoir, in the Narmada appraisal techniques. Maharashtra estuary, and the Sardar Sarovar command area. A village development fund to support resettlement assistance for management of wildlife sanctuaries in Gujarat. Technical assistance for trainini and basin wide environmental management. Environmental Assessment Category D. - 58 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender Project ' Consulting Services Action on Procurement 4 INDIA (Cont'd) Department of 124.0 (R) Maharashtra State Forestry - To Consulting services will Negotiations under way. Forestry of (IDA) initiate a comprehensive approach to be required for Maharashtra State forestry resource management in an upgrading of nursery, Government environmentally sound way in the planting material, Maharashtra State. The project would fodder, and research. not be subiect to a separate Services also required environmental assessment. Environmental for restructuring of Assessment Category D. forest administration, and bio-diversity conservation studies. Government of About Subernarekha (Orissa) Irrigation - To To be determined. Appraisal contingent upc Orissa, Department 155.0 develop a new irrigation system for reaching agreement an of Irrigation (Bank) about 100,000 ha including the seasonal distribution o 125.0 construction of three buffer reservoirs, water between Orissa anc (IDA) major and distributory canals, field Bihar and tangible prooA channels, on-farm development and to of implementation of provide additional agricultural support resettlement plans. services, improved irrigation water management, and environmental protection works. An environmental impact assessment is under preparation. Environmental Assessment Category A. Government of West About (R) Kangsabati Irrigation Studies by foreign and Pre-appraisal evaluatios Bengal, Department 30.0 Modernization - To rehabilitate and in-country water has been postponed of Irrigation (Bank)/ upgrade an existing irrigation system of management (Plan of pending completion of ti 60.0 up to 340,000 ha by construction of Operations and Plan of Operations and (IDA) works including an additional spillway Maintenance) and Maintenance (POM) and related enhancement of storage environmental consultancy. Project utilization of Kangsabati Dam, lining of consultants has been preparation report basei the canal system and providing improved initiated. on preliminary POM water operations management and on-farm estimates has been development, construction of diversion received from FAO/CP, ai weirs for reuse of return flows: its distribution to the development of drainage and potential Government approved. TI groundwater (conjunctive use), EIA report has been facilities; and provision of received and is under agricultural support services, training review. and implementation support. Limited environmental impact. Environmental Assessment Category B. To be determined 85.0 (R) Shrimp and Fish Culture - To develop To be determined. Board presentation (IDA) brackish water shrimp ponds in West scheduled for January 2 Bengal, Orissa and Andra Pradesh; inland 1992. fish areas in reservoirs and ox-bow lakes in West Bengal, Orissa, Andra Pradesh, Uttar Pradesh and Bihar. Also, to develop hatcheries, fish mills and other support facilities, in addition to technical assistance and training. Environmental Assessment Category B. Government of 250.0 Nabard II - Support for Agriculture To be determined. Awaiting details of India, NABARD (Bank) Credit. The project would supplement Government of India's GOI resources for agriculture lending. reform program, Project objectives would include particularly in the identification and implementation of financial sector. appropriate reforms now required to revitalize agriculture lending and to make it more sustainable and effective; it would also contribute to the production needs of women and to poverty alleviation. Environmental Assessment Category B. - 59 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project s Consulting Services Action on Procurement 4 INDIA (Cont'd) Power Finance 265.0 Power Utilities Efficiency Improvement - Need for local and Negotiations completed. Corporation (Bank) Financial support to the Power Finance expatriate consultants Board presentation Corporation (PFC) which will serve as a for institutional deferred pending progress development bank in the power subsector development and training on power sector primarily for the State Electricity under review. institutional and Boards (SEBs). Environmen- financial problems. tal/resettlement aspects to be included in project selection criteria. Environmental Assessment Category B. Ministry of 300.0 National Highways II - To modernize The participating states Negotiations completed. Surface Transport (Bank) about 290 km of National Highways in six are employing Board presentation (MOST) states; to increase road construction consultants for project deferred pending progress capacity and promote technology transfer preparation. on contractural problems and skill development; to promote under National Highways institutional improvements, and; I. reconstruction of six bridges in Orissa has been included. The proiect has environmental benefits and one potentially adverse impact (unstructured development that may be induced by road works). Environmental Assessment Category B. Ministry of 250.0 Industrial Energy Conservation - To Consultant may be Appraisal report Energy, Department (Bank) formulate plans for energy conservation required to: completed. Negotiations of Power in selected industries; to establish (a) establish database; postponed pending mechanisms and institutions needed to (b) conduct subsector completion of Government identify and implement the sub-projects, energy surveys; clearances. to improve efficiency of processes (c) design a tax/subsidy including substitution of petroleum- scheme; (d) identify based fuels by other sources of energy; barriers to and suggest and to minimize dependence on unreliable measures to encourage supplies of power, etc. Project will energy service have a beneficial impact on the companies; (e) identify environment through reduced specific barriers to and suggest energy consumption, and therefore measures to encourage reduces harmful gas emissions per unit cogeneration projects in of output. Environmental Assessment industry (f) quantify Category D. training needst (g) assist in the start- up of the Energy Management Center; (h) assist Bureau of Indian Standards in undertaking a related program; and (i) other institutional support. INDONESIA Environmental 12.0 BAPEDAL Development - Technical Consulting services will Preparation under way. Impact Management (Bank) assistance for the newly established be required. (Cofinancing for project Agency (BAPEDAL) BAPEDAL, including institutional preparation has been strengthening and direct support for provided from the Japan pollution control efforts at the Grant Facility.) national level and selected provinces. Environmental Assessment Category C. - 60 - Member Country, Amount & Implementing Probable Stage of Processing i Agency ' Lender 2 Project I Consulting Services Action on Procuremeni INDONESIA (Cont'd) Perusahaan Umum 80.0 (R) Cirata Hydroelectric (Phase II) - To be determined. Pre-appraisal missioI Listrik Negara (Bank) Project would complete the development scheduled for March I (PLN) of the Cirata Hydroelectric project by 1992. the addition of four generating units of 125 MW each and civil works consisting of two power tunnels and four tailrace tunnels. Environmental Assessment Category: To Be Determined. To be determined 140.0 Agriculture Extension and Training IV - To be determined. Identification under (Bank) To improve efficiency of the Government's agriculture extension and training programs with a special emphasis on outer islands. Environmental Assessment Category: To Be Determined. To be determined 200.0 Gas Utilization II - To promote non- To be determined. Identification under (Bank) tradeable supplies of natural gas for industrial and commercial use to meet demand in Java. Environmental Assessment Category: To Be Determined. To be determined 280.0 Rural Electrification II - Support for To be determined. Identification under (Bank) the Government's rural electrification program and for further development of Government's role in encouraging private participation in rural electrification. Environmental Assessment Category: To Be Determined. To be determined 100.0 Industrial Technology Development - To To be determined. Identification undez (Bank) support policies, infrastructure and human resource development and to promote financing for technology transfer and development of technological innovation in the industrial sector. Environmental Assessment Category: To Be Determined. Ministry of Public 50.0 (R) Kalimantan Urban Development - Five- Consulting services are Project preparation Works, Directorate (Bank) year urban infrastructure expenditure needed for project under way. Possiblf for Programme programs for participating local preparation and appraisal in May 191 Development governments. These will include implementation and municipalities of Samarinda, Balikpayan, institutional Banjarmasin, Palangkaraya and Pontianak strengthening, including which account for about 80% of the training. Kalimantan urban population. Environmental Assessment Category B. Ministry of Public 90.0 Semarang/Surakarta Urban Development - Consultants are Project preparation Works, Director (Bank) Improvement of the functioning of the currently assisting with progress. General for Human two major cities in Central Java preparation and Settlements Province through an integrated program environmental of priority infrastructure investments assessments. supported by revenue improvement and Consultants will be institutional development action plans. required for Environmental Assessment Category B. implementation support, detailed design and supervision. - 61 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender Project Consulting Services Action on Procurement 4 IWDONESIA (Cont'd) To be determined 30.0 (R) Irian Jaya Area Development - To To be determined. Further processing in (Bank) improve overall socio-economic abeyance pending conditions of Irian Jaya through an agreement with GOI on integrated area development project their strategies for comprising health, education, regional development and agriculture and infrastructure Irian Jaya development. development activities in the pilot Scope may be broadened t, areas. Environmental Assessment include development of Category A. other Eastern Island provinces. To be determined 75.0 Secondary Teacher Development - To To be determined. Project identification (Bank) improve the quality of secondary under way. teachers through in-service and pre- service training. Environmental Assessment Category: To Be Determined. To be determined 75.0 Integrated Swamps - Strengthen Consultants are Pre-appraisal mission (Bank) institutional framework for swamps finalizing preparation scheduled for March 1992 reclamation and support integrated study. development of viable existing reclaimed swamps; rehabilitate infrastructure, improve agriculture, and support environmental protection. Environmental Assessment Category A. Ministry of Health 70.0 (R) Water and Sanitation for Low Income Consultants and NGOs Project identification (DG of (Bank) Community - To meet basic needs of low will be required for under way. Communicable income communities in rural and urban project preparation. Disease), Ministry areas, and improve health status and of Public Works productivity through provision of safe, (DG Cipta Karya), adequate and easily accessible water Ministry of Home supply and proper sanitation. Affairs (DG Environmental Assessment Category B. Bangda/Bangdes) Ministry of Public 300.0 Highway Sector II - To improve the To be determined. Project identification Works/Ministry of (Bank) quality of interurban national/ under way. Communications provincial roads through selective capacity improvements and maintenance. Also, to improve formulation and implementation of road infrastructure and road transport policies. Environmental Assessment Category: To Be Determined. Perusahaan Umum 350.0 (R) Outer Islands Power - To support To be determined. Project identification Listrik Negara (Bank) expansion of generation and transmission under way. (PLN) facilities in outer islands, including South Sumatra and South Kalimantan. Project scope not yet defined. Environmental Assessment Catexory A. Bank Indonesia/ 150.0 (R) Emerging Enterprises Development - To be determined. Project has been removed Participating. (Bank) Provision of term credit and technical from the Lending Program Financial assistance to small enterprises in all due to disagreement on Institutions directly productive sectors through the selection criteria participating financial institutions. for participating banks. Subprojects in environmentally sensitive Further reporting will b sub-sectors will be required to submit a discontinued. satisfactory environmental impact assessment. Environmental Assessment Category B. - 62 - Member Country, Amount & Implementing Probable Stage of Processing az Agency Lender 2 Project s Consulting Services Action on Procurement INDONESTA (Conted) Perusahaan Umum 350.0 (R) Telecommunications IV - To provide Consultants will be Appraisal mission in t Telekomunikasi (Bank) additional telephone services in Java, required for project field. (PERUMTEL); Bali, East Nusa Tenggra and Sulawesi; implementation, human Posts and and Improve service and modernize resource development, Telecommunications telecommunications facilities. financial management (POSTEL) Environmental Assessment Category B. strengthening and future project preparation. Ministry of Public 90.0 (R) Surabaya Urban Development II - To Consultants for project Project preparation us Works (Bank) help institutional strengthening and preparation have been way. Pre-appraisal priority urban infrastructure selected and will be mission scheduled for investments in Surabaya. Environmental funded under PPF. February 1992. Assessment Category A. Ministry of Home 175.0 (R) Kabupaten - Maintenance and To be determined. Project preparation ur Affairs: Ministry (Bank) rehabilitation of local roads in about way. Appraisal missic of Public Works 65 districts. Institutional and human scheduled for the end resources development through training January 1992. and improvement of planning/budgeting and implementation arrangements, particularly for road maintenance. Environmental Assessment Category B. Directorate 100.0 (R) Groundwater Development - Consultant requirements Project preparation us General of Water (Bank) Construction of groundwater irrigation for project way. Resources, system for an area of about 23,000 ha; implementation to be Ministry of Public pilot support for private sector determined. Works development of shallow tubewells institutional resources development; and training for water user associations and extension services for on-farm water management and crop diversification. Environmental Assessment Category B. To be determined 75.0 Provincial Health III - The project To be determined. Project identificatioi (Bank) would support health sector expenditure under way. investment programs in selected provinces. Environmental Assessment Category: To Be Determined. Ministries of 100.0 Watershed Management and Conservation - To be determined. Project under Forestry, (Bank) Strengthen sustainable natural resource preparation. Agriculture and management in critical watersheds. (Possible financing f Home Affairs Institutional development at national the Global Environmen and regional levels and specific Facility (GEF) -- see conservation activities in Cimanuk Annex C.) Watershed in West Java. Would reduce land and resource degradation and improve social conditions. Environmental Assessment Category B. To be determined 100.0 Industrial Skills Development - To To be determined. Project identificatia (Bank) support industrial skills development. under way. Environmental Assessment Category C. - 63 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project s Consulting Services Action on Procurement 4 INDONESIA (Cont'd) Public.Port . 90.0 (R) Ports Upgrading - The project would Consultants have been Project identification Corporation II (Bank) focus on expansion requirements in recruited by Perumpel II under way. (Perumpel II); secondary ports to meet rapidly for pre-investment Ministry of increasing traffic and improve studies for two ports. Communications installations and practices for Consultants will be (MOC) environmentally safe maritime transport required for other in general. Environmental Assessment components. Category A. To be determined. 25.0 (R) Primary Teacher Development - To To be determined. Project preparation unde (Bank) support the Government's plan to upgrade way. qualifications of primary teachers through in-service and pre-service programs to improve the quality and expanded capacity of basic general education systems. Environmental Assessment Category C. Perusahaan Umum 400.0 Suralaya Thermal Power - To support Consultants selected for Appraisal report under Listrik Negara (Bank) expansion of Suralaya Thermal Power project implementation. preparation. Pusat (PLN) project by the addition of 3 x 400 MW Consulting services will units, to meet expected growth in demand be required for Advance Procurement: for electric power in Java. technical assistance Action involving tender Environmental Impact Assessment report components. invitation will be was received and the summary was initiated. circulated to the Board. Environmental Assessment Category A. Environmental 80.0 Industrial Efficiency and Pollution Consulting services will Pre-appraisal mission Impact Control (Bank) Abatement - To provide a package of be required for project scheduled for Board (BAPEDAL) credit and services to existing preparation and February 10, 1992. industrial enterprises to enable them to implementation. comply with environmental standards. The project would also develop or strengthen the capability of Ministry of Industry staff, local authorities and consultants in environmental analysis and monitoring. The project targets the abatement of industrial pollution. Environmental Assessment Category D. Ministry of 45.4 (R) Primary Education Quality Foreign and local Negotiations scheduled Education & (Bank) Improvement - To improve the quality of consulting services will for December 9, 1991. Culture primary education. Environmental be required. Assessment Category C. Ministry of 69.5 (R) Non-formal Education III - Support Local consultants will Board presentation Education and (Bank) for non-formal education, and income be required. scheduled for Culture generating skills training for poverty December 20, 1991. groups. Environmental Assessment Category A. -64 - Member Country, Amount & Implementing Probable Stage of Processing an . Agency ' Lender 2 Project s Consulting Services Action on Procurement INDONESIA (Cont-d) Ministry of 200.0 Financial Sector Development - Support Consultant services Awaiting GOI's Finance/Bank (Bank) of GOI legislation and policy reforms to required for bank preliminary Indonesia strengthen the Indonesian financial supervision and credit recapitalization plan system by strengthening prudential information systems. state commercial banks control and supervision, and needed for further recapitalization of state commercial project processing. banks. Environmental Assessment An additional PPF adva Category C. of US$700,000 approved finance the services a experts to assist Bank Indonesia: (a) in preparation of technic assistance for strengthening its supervision capabiliti and (b) undertaking qualitative evaluatior state commercial bank; asset quality in orde2 determine their additional capital requirements. Directorate 100.0 (R) Tree Crops Smallholder Development - Consultant services will Negotiations schedule General of Estates (Bank) To support Government's efforts to be required for project for mid-January 1992. increase smallholder coconut and rubber implementation. (Japan has approved Gi production. A revised environmental funds for technical impact assessment has been prepared assistance.) addressing all issues regarding land use, agricultural practices, and use of agro-chemicals. A related management plan has also been prepared, and is being reviewed by the Government. Environmental Assessment Category B. Ministry of 140.0 (R) Transmigration Second Stage Consultant services will Project will be re- Transmigration (Bank) Development - Increased income and be required for a appraised to update di (MOT) agricultural production in 8 existing central advisory team and project scope. trans-settlements; strengthen MOT and field technical Timing of re-appraisa coordination and Implementation assistance teams. mission to be determt capacities for second stage development; and improve overall economic, social and environmental soundness of the Retroactive financina transmigration program. Project US$5.0 million has be includes a component for protecting requested by the wildlife to be updated. Environmental Government. assessment prior to completion of appraisal. Environmental Assessment Category A. Ministry of Health 75.0 Community Health and Nutrition III - The To be determined. Project preparation u (Bank) project would: (a) reduce infant and way. maternal mortality in selected areas focussing on the poor; (b) improve health information system and (c) health education capability. Environmental Assessment Category C. - 65 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender Project s Consulting Services Action on Procurement 4 KOREA Ministry of 50.0 (R) Science Education and Libraries Consulting services will Appraisal mission Education (Bank) Computerization - Will finance equipment not be required. completed. Appraisal - to support quality improvement in report under preparation. secondary and undergraduate science education and to assist development of libraries' computer network. Environmental Assessment Category C. Ministry of 30.0 (R) Vocational Schools Development - Contracts will be Appraisal mission Education (Bank) Will finance equipment to improve awarded to local completed. Appraisal quality of vocational education. consultants in the report under preparation. Locally-financed studies aimed at amount of institutional strengthening. US$0.2 million. Environmental Assessment Category C. Ministry of Health 30.0 (R) Public Hospital Modernization - To Consulting services Appraisal mission & Social Affairs (Bank) support: (a) improvements in the will not be required. tentatively scheduled for capacity of public hospitals to meet mid-February 1992. increased demands for medical care, especially by the urban and rural poor; (b) strengthening of public health institute; and (c) studies of health care financing. Environmental Assessment Category C. Korean National 60.0 Railway Systems Modernization - Consulting services will Appraisal mission Railroad (Bank) Includes: (a) implementation of a be needed to develop and completed. Appraisal computerized OIS/MIS; (b) development of implement railroad report under preparation. series of operational action plans; computer management (c) acquisition of electric cars; and information systems and Retroactive financing of (d) technical assistance training. to prepare an action up to 10% may be Implementation over a four year period plan to introduce public requested for OIS from 1992-1995. Environmental service contracts in the packages and electric Assessment Category B. railroad. rail cars. Ministry of 40.0 (R) Pusan and Taejon Sewerage - Consultants have been Project appraisal Environment (Bank) Construction of two sewerage treatment appointed. completed. Negotiations plants with capacities of 340,000m'/d scheduled for 1992. and 150,000'/d, and of about 20 km of interceptors with large diameters. Environmental Assessment Category B. Korea Gas 100.0 (R) Gas System Expansion/Natural Gas Consulting services Approved by the Executive Corporation (Bank) Utilization - Loan, modest in comparison will be required for Directors on November 5, to the project cost, would assist in implementation. 1991. Loan was signed on important areas of current plans for December 11, 1991. large scale increases in LNG, increase in report facilities and natural gas Retroactive financing of supply system such as environment, US$10.0 million being institutional development and technology considered for partial transfer. Environmental Assessment payment of lons delivery Category A. equipment. Seoul Metropolitan 80.0 Solid Waste Management - To assist SMG Local consultants have Appraisal report under Government (SMG) (Bank) in reducing collection costs through been engaged for the preparation. implementation of solid waste transfer first two transfer facilities, and providing environmental- stations. Retroactive financing of ly safe disposal through implementation up to US$8.0 million has of sanitary landfill facilities. Bank been requested by the has received Government clearance for Government to cover cost the environmental assessment. Environ- of trailers and tractors mental assessment has been distributed for the first transfer to the Executive Directors, station. Environmental Assessment Category A. - 66 - Member Country, Amount & Implementing Probable Stage of Processing a Agency ' Lender * Project s Consulting Services Action on Procurement LAO, PEOPLE*S DEMOCRATIC REPUBLIC Electricite du 34.0 (R) Provincial Grid Integration - To be determined. Appraisal report unde Laos (EDL) (IDA) Project will include: (a) extension of preparation. rural electricity networks in southern and central provinces; (b) feasibility study for a 40 MW expansion of the Nam Ngun hydroelectric plant and (c) institutional development component for EDL. Environmental Assessment Category C. Department of 10.0 (R) Northern Rural Development and To be determined. Project preparation u Forestry and (IDA) Watershed Management - To extend the way. Environment, approach and methodology of the Upland Ministry of Agriculture Project to Luang Prabang and Agriculture and several other northern provinces, Forestry especially emphasizing environmental issues and poverty alleviation. Environmental Assessment Category B. Ministry of 10.0 (R) National Forestry Management and Consultants have been Appraisal mission is Agriculture & (IDA) Conservation - To support selected to finalize the field. Forestry recommendations of Tropical Forestry preparation. Additional (Japan T.A. Grant Action Plan, including development of sources will be required Facility support has improved legislative and institutional for implementation. obtained to complete framework for the forestry sector; project preparation. completion of forest resource inventory Possible financing al work; strengthening of forestry from the Global management: and implementation of forest Environment Facility resource management conservation Annex C), FINNIDA an4 programs. Environmental Assessment BMZ.) Category B. Ministry of 20.0 Education Sector Development - To Consultants will be Appraisal mission is Education and (IDA) respond to inmediate needs for quality required for the field. Sports and efficiency improvements in basic implementation. (CofinancLng is betN4 education through: restructuring of explored with Swiss administration and preparation of the Government. Japan G Education Act; establishing an Facility agreement f educational management information project preparation system, including school mapping; signed on February 6 developing new curricula and related 1991.) instructional materials; and rehabilitation of school infrastructure. Environmental Assessment Category C. Retroactive financin likely to be needed. Ministry of Health 10.0 (R) First Health - To reduce the high Consulting services Project preparation and Social Welfare (IDA) incidence of preventable communicable required for preparing way. diseases in three priority provinces and and implementing the (Cofinancing to be s increase the efficiency of health project. for implementation. services delivery through strengthening Japan Grant Facility selected provincial and district systems approved Government and infrastructure. It would also adapt approval for project training curricula to health needs and preparation. Awaiti strengthen the government's capability signing.) to formulate, analyze and implement health policies. Environmental Assessment Category C. - 67 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project Consulting Services Action on Procurement MALAYSIA Ministry of 104.0 (R) Polytechnic Development - Establish Consulting services Negotiations tentatively Education (Bank) three new polytechnic institutes with required for preparing scheduled for April 1992. 12,000 new full-time training stations and implementing the - and 3,000 part-time training stations; project. train 1,000 new teachers and administrators: implement major policy reforms to convert national deliver system to be more -demand-driven" and operationally efficient. Would also adapt and introduce a broader range of technical curricula. Environmental Assessment Category C. Sarawak Public 50.0 Sarawak Roads - Rehabilitation and Consulting services for Project preparation unde2 Works Department (Bank) upgrading of 160 km of main trunk road supervision and way. (Japan T.A. Grant system, procurement of weighbridges. technical assistance Facility support of yen Total estimated cost US$100.0 million. will be required. 64.0 million has been Environmental Assessment Category A. awarded for environmental studies and partial contribution towards detailed design studies.) Ministry of 30.0 Non-formal Education and Training (NFET) Consultants will be Project preparation undei National and Rural (Bank) - To build up a national institutional required for supervising way. Development capability for developing NFET, and to the project. (Japan T.A. Grant support selected NFET programs targeted Facility support of yen at various disadvantaged groups such as 50.62 million has been unemployed youth, undereducated women, awarded for WID.) and displaced farmers. Environmental Assessment Category C. Tenaga Nasional 200.0 (R) Power System Development - Will Consulting services for Negotiations in progress. Berhad (TNB) (Bank) finance the following components from Paka will be appointed the Tenaga Nasional Berhad's (TNB's) and financed by Tenaga Retroactive financing of investments: (a) 1 x 300 MW gas-fuelled Nasional. US$10.0 million will be combined-cycle power block at the allowed. existing 900 MW Paka power station; (b) 230 km long, 275 kV Kampung Awah- Yong Peng transmission line; (c) 275- 132 kV system expansion for power supply in Kuala Lumpur. Environmental Assessment Category A. Federal Land 95.0 (R) Third FELCRA Land Development - Time To be determined. Appraisal mission in the Consolidation and (Bank) slice financing of most of FELCRA's field. Rehabilitation program including the rehabilitation of R Authority (FELCRA) low yielding small farms with tree crops Retroactive financing of in schemes under group farming US$9.5 million*likely to arrangements, the construction of scheme be needed. access roads, and infrastructure, promotion of improved agricultural technology, institutional strengthening and small farmer entrepreneurship. Environmental Assessment Cateaory B. - 68 - Member Country, Amount & Implementing Probable Stage of Processing a Agency Lender Project Consulting Services Action on Procurement MALAYSIA (Cont-d) Ministry of Health 40.0 Health Development - To improve the Consultants appointed Project preparation us and Chemistry (Bank) capacity to monitor environmental health for project preparation way. Department of and infectious diseases, enhance equity and implementation, and (Japan T.A. Grant Science, in access to health development through financed by Japan T.A. Facility has been Technology and primary health care, support health Grant Facility. approved for project Environment development through use of appropriate preparation.) health technology, and to strengthen Ministry of Health's institutional capacity through management and personnel training, health technology assessment and quality assurance, occupational health and other policy development. Environmental Assessment Category C. Ministry of 30.0 (R) Drainage and Flood Mitigation - Time Consulting services will Project preparation us Agriculture, (Bank) slice of national drainage program, be required for project way. through Department covering 5-8 schemes throughout preparation. (Japan T.A Grant Fact of Irrigation and Malaysia, and including infrastructural has committed funds £h Drainage investments and related agricultural preparation assistanco development, as well as institutional strengthening of the drainage and irrigation department. Environmental Assessment Category A. Ministry of 150.0 (R) Primary and Secondary Education To be determined. Appraisal mission is Education (Bank) III - Improve quality of education, the field. increase managerial efficiency, improve access to better education. Reinforce and complement ongoing sector projects through provision of instructional resources, construction of additional schools, state and school resource centers: and new teacher training colleges: establishment of an effective educational technology network: strengthening of school-based evaluation expansion of teaching and managerial staff development program; and studies on major sectoral issues. Environmental Assessment Category C. - 69 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender * Project Consulting Services Action on Procurement * MALDIVES State Trading 10.0 (R) Fisheries III - Support the Consultant services will Negotiations completed. Organization, (IDA) fisheries sector through: be required for detailed Board presentation Government of (a) construction and provision of design and construction scheduled for Maldives equipment and support facilities a fish supervision of project December 20, 1991. freezing/cold storage complex; port and fish freezing/ (Co-financing from Nordic (b) construction of port facilities and cold storage plant, and Development Fund (NDF), provision of collector vessels; collector vessels. Norway, Sweden, OPEC Fund (c) provision for improving tuna fish Consultant services will and UNDP). stock assessment; (d) technical also be required for assistance to develop and start-up the technical assistance, PPF approved for detailed proposed cold storage complex, and for including restructuring design of port, institutional strengthening, and to of public sector refrigeration/cold encourage increased private sector fisheries enterprise and storage plant and participation in the fisheries sector. encouragement of private collector vessels, and-, No major environmental impact is sector participation. for restructuring of expected. Preparation and design. public sector fisheries however, include environmental enterprise. assessment/mitigation to address impacts concerning the siting, construction and operation of shore-based facilities; and management of the coastal marine resources and avoiding over-fishing. Environmental Assessment Category B. MONGOLIA Ministry of Trade 30.0 (R) Economic Rehabilitation - Financing Consultants for Board presentation and Industry (IDA) of critical imports needed to support procurement advisory and scheduled for economic stabilization reform and logistic services have December 19, 1991. restructuring program. Environmental been selected. Assessment Category C. Retroactive financing of up to US$3.0 million to be recommended. Ministry of 5.0 (R) Technical Assistance - Supports Consultant services will Board presentation Finance (IDA) formulation and implementation of be required for scheduled for economic reforms and related activities implementation of December 19, 1991. including foreign consultancies, in- various project (Cofinancing expected country and overseas orientation and components. from Japan and UNDP.) training for officials, and related materials and equipment; and assistance for sector studies and broadly defined project preparation activities. Environmental Assessment Category C. NEPA. Ministry of 18.0 (R) Rural Water Supply and Sanitation - Consultants (both local Project is under Housing and (IDA) Improvement of rural water supply and and international) are preparation. Physical Planning sanitation under the new policy currently being guidelines with greater involvement of recruited to finalize user committees and non-governmental project preparation. agencies. Project would involve the rehabilitation of about 300 existing schemes and construction of 70 new ones. Environmental Assessment Category B. - 70 - Member Country, Amount & Implementing Probable Stage of Processing S Agency ' Lander * Project Consulting Services Action on Procurement NEPAL (Cont'd) Sunsari Morang 27.0 (R) Sunsari Morang New Headworks - To Consultants have been Memorandum of the Irrigation (IDA) address the serious siltation problem retained to assist with President scheduled f Development Board with the ongoing Sunsari Morang detailed design and December 1992. Irrigation II project (Credit 1814-NEP). construction supervision The project would: (a) construct a new of the new headvorks. intake about 1300 m upstream of the existing intake; (b) increase capacity of existing desilting basin (c) construct a microhydro unit; (d) supply dredging equipment; (e) undertake institutional strengthening and train project staff; (f) provide technical assistance for detailed design and implementation; and (g) undertake environmental protection activities. Environmental Assessment Category B. Department of 57.0 (R) Road Maintenance - Project includes: Consulting services will Project preparation 1 Roads (IDA) (a) reorganization of the Department of be required for begin in January 199, Roads; (b) support for a three to four preparation of road year road maintenance, rehabilitation maintenance and and training programs; (c) rehabilita- rehabilitation, and tion of priority trunk and feeder roads; training. The (d) staff training in management and Government is in the execution of road maintenance; and process of preparing (e) technical assistance for planning requests for proposal and budgeting exercises as well as to for consultants. develop technical capacity for engineering design and supervision of works proposed. Environmental Assessment Category B. Nepal 35.0 Telecommunications V - Includes 61,000 To be determined. Negotiations tentatt Telecommunications (IDA) local telephone lines, rural scheduled for Januar Corporation transmission to 26 districts, outside 1992. plant network, main trunk network. (Co-financing from Total cost US$120 million of which FINNIDA, Japan US$100 million in foreign exchange. No International Cooper malor environmental impact. Agency (JICA), and D Environmental Assessment Category C. and possibly from Fr and Belgium Governme Nepal Electricity 60.0 Power Sector Efficiency - Consists of Consulting services will Board presentation Authority (IDA) components aimed at rehabilitation/ be required for project tentatively schedule upgrading of the Nepal interconnected supervision and January 28, 1992. system (generation, transmission and technical assistance. distribution as well as continue Consultants are about to Advance Procurement: institutional strengthening of the Nepal be retained for project Advance procurement Electricity Authority (NEA)). Because supervision. under way for the c the proposed project will be Primarily and electro-mechanic confined to upgrading the efficiency of components of the the existing system, it is not expected Trisuli-Devighat Hyd to have major environmental impacts; the Electric Upgrading Marsvangdi Watershed Management Project. component would assist in improving environmental management of the Marsyangdi water shed. Environmental Assessment Category B/D. - 71 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender Project s Consulting Services Action on Procurement 4 NEPA. (Cont'd) Department of 44.0 (R) Irrigation Sector - To: (a) Consulting services to Project preparation under Irrigation (IDA) construct small and medium farmer be provided by way. managed surface schemes and rehabilitate individual consultants existing farmer managed surface schemes financed under an on- in the Hills and Teral areas; (b) going UNDP project. construct farmer-group managed groundwater schemes on the Terai; (c) institutional development support. Environmental Assessment Category B. Ministry of 45.0 (R) Basic and Primary Education - To To be determined. Negotiations tentatively Education and (IDA) continue support to primary education scheduled for January 27, Culture and non-formal education. Environmental 1992. Assessment Category C. (Cofinancing interest expressed by DANIDA, DGIS, UNDP and UNICEF. Japan T.A. Grant Facility has provided funds for preparation and early implementation stage.) Ministry of Health 15.0 Population and Health - To improve To be determined. Post appraisal mission (IDA) health conditions and reduce population scheduled for January growth by strengthening of family 1992. planning and maternal child health (Japan T.A. Grant programs. Environmental Assessment Facility agreement being Category C. finalized.) Ministry of Works 22.0 Multimodal Transport - Will focus on All consultancy Trade and Transit Treaty and Transport; (IDA) introduction of intermodal container activities have been with India has delayed Nepal Transport services and will implement suspended. project processing. Corporation (NTC) administrative/operational improvement Project will need to be measures and training programs for re-appraised when this improved transit management. Project issue is resolved. components are: procurement of container chassis, trucks, handling equipment, construction of combined container terminal, technical assistance, and training. Total project cost estimated at US$52.0 million. Environmental impact is expected to be insignificant. Environmental Assessment Category C. Government of 16.5 Financial Institution Development - To Consultants may be New Government has Nepal (IDA) support the formulation and financing of required. More declined to negotiate industrial development programs of high information on project and has asked priority, and to develop a more viable consultant requirements that the project concept and competitive industrial financing will be known at a later be reviewed/re-appraised. system. Environmental Assessment date. Catemory C. Ministry of 20.0 (R) Third Agriculture Extension - To be determined. Project preparation Agriculture (IDA) (a) Increase agricultural, horticultural pending agreement with and livestock production; (b) improve Government on extensive institutional framework of extension strategy. (c) integrate extension services for agriculture, horticulture and livestock production at field level; and (d) strengthen extension/research linkage. Environmental Assessment Category C. - 72 - Member Country, Amount & Implementing Probable Stage of Processing Agency Lender 2 Project I Consulting Services Action an Procuremer NEPAL (Cont'd) Nepal Electricity 173.0 Hydrd Power'(Arun III) - 402 MW run-of- Consultants have been Project appraisal Authority (IDA) river hydropower plant with associated appointed. tentatively schedule transmission facilities and February 1992. institutional strengthening of the Nepal (Co-financing from A Electricity Authority. Action Plan to Swedish Agency for ameliorate the hydro project's International Techni environmental impacts is under Economic Cooperatior preparation and will be implemented in (BITS), KfW, ODA (UP conjunction with this project. OECF, UNDP, Nordic Environmental Assessment Category A. Development Fund, ti Governments of Belgi Finland and Italy as possibly the Governs of Austria and Franc well as Export Kreditamnden (Swedii Export Credit Agenc3 PAPUA NEW GUINEA To be determined 3.0 Construction Technical Assistance - To be determined. Identification unde (Bank) Scope of project to be determined. Environmental Assessment Category: To Be Determined. To be determined 10.0 Forestry - To support institutional To be determined. Preparation under w. (Bank) restructuring of the forestry sector and other components of the national forest plan. Environmental Assessment Category Department of 5.0 (R) Petroleum Development Technical Consulting services will Pre-appraisal missi Mines and Energy, (Bank) Assistance - Technical and economic be required for completed. Government of studies for evaluation of downstream technical and economic Papua New Guinea projects. Review of procedures for studies, review of evaluation of applications for petroleum procedures, and development licenses, and strengthening institution building. of institutions involved with petroleum exploration and development. Environmental Assessment Category: To Be Determined. To be determined 8.0 Population - Assists Government's To be determined. Project identificat (Bank) population policy through: under way. (a) strengthening family planning service delivery; (b) promoting demand for family planning; (c) strengthening institutional capacity to develop population policy and direct/manage family planning activities; and (d) improving demographic information base. Environmental Assessment Category National 30.0 (R) Education Sector Program - Consulting services will Project preparatit Department of (Bank) Construction and equipping of one likely be required for way. Appraisal m Education national high school, school project management. scheduled for Febin maintenance, regional planning and 1992. teacher support services. Environmental Assessment Category C. - 73 - Member Country, Amount & Implementing Probable Stage of Processing and Agency - Lender Project s Consulting Services Action on Procurement 4 PAPUA NEW GUINEA (Conted) Department of 23.0 Ora Smallholder Oil Palm Development - To be determined. Negotiations date to be Agriculture and (Bank) To develop about 6,500 ha of land in Oro determined. Livestock Province into smallholder oil palm farms. The appraisal mission and government of Papua New Guinea discussed three main environmental issues: factory effluent treatment which should be upgraded: choice of proiect area outside of primary forests; and protection of an endangered butterfly. In addition sound agro-chemical usage and soil protection procedures are to be provided for. Environmental Assessment Category B. PHILIPPINES Central Bank 150.0 (R) Export Development - Project will To be determined. Project has been removed (Bank) support measures to accelerate from the Lending Program. development of exports including export Further reporting will be financelguarantee, infrastructural, discontinued. institutional support. Environmental Assessment Category C. National Power 365.0 (R) Leyte Geothermal Power - To meet Consultants are Appraisal departure Corp. and (Bank) increasing power demand in Luzon at completing final scheduled for Philippine lowest cost by utilizing geothermal engineering. August 1992. National Oil Co. resources in Leyte. Project will A major reform program, include: (a) development of Leyte including institutional, Geothermal; (b) construction of about corporate and financial 440 MW power generating capacity; and measures, is under way. (c) the Leyte-Luzon transmission line. (Cofinanciers' meeting Environmental assessment under for US$1.0 billion preparation. Environmental Assessment scheduled for March 1992. Category A. Possible financing from the Global Environment Facility (GEF) -- see Annex C.) Premiumed Central 70.0 (R) Third Municipal Development - Consultants have been Appraisal report under Project Office (Bank) Project will strengthen institutional selected. review. framework developed under Bank's First and Second Municipal Development projects to provide local governments with access to loan financing to meet their investment needs. Environmental Assessment Category B. Metro Manila 80.0 (R) Metro Manila Solid Waste Local consultants have Appraisal departure Authority (NMA) (Bank) Management - Would include: been engaged. scheduled for mid-1992. (a) development of two sanitary landfills; (b) construction of four transfer stations; (c) procurement of transfer trucks and equipment for landfill operationsl (d) rehabilitation of maintenance workshopst and (e) technical assistance for operations and management of solid waste operations and related studies. Environmental Assessment Category D. -74- Member Country, Amount & Implementing Probable Stage of Processing a Agency Lander Project 3 Consulting Services Action on Procuremeni PHILIPPINES (Cont'd) Local Water 40.0 Second Water Supply, Sewerage and Consultants have been Project preparation I Utilities (Bank) Sanitation Sector - To assist the selected. under way. Administration Government in meeting basic needs of (LWUA) urban population through provision of safe, adequate, easily accessible water supplies through implementation of extensions of systems in some 50 towns. Institutionally, project would: (a) strengthen LWUA as a financial intermediary; (b) develop organizational arrangements in WDs and RWSAs for improved operation, maintenance and financial practices; (c) enhance technical abilities of Water Districts; (d) provide training in design, operation and maintenance of systems, and in environmental aspects. Environmental Assessment Category B. Department of 35.0 (R) Tax Computerization Study - Would Initial studies being Two IMF technical Finance (Bank) improve administration of all taxes in prepared by consultants assistance missions the Philippines by establishing an hired by ADB. Technical provided assistance integrated, computerized tax system. assistance financed by improved procedures Environmental Assessment Category C. additional Japanese organization. Grant will design remaining components and bidding specifications. Department of 70.0 Urban Health and Nutrition - To assist To be determined. Project preparation Health (Bank) the Government to expand and improve way. public health and nutrition services for high-risk urban slum dwellers, especially women and children, in Metro Manila, Cebu and Cagayan de Oro. Environmental Assessment Category C. National 75.0 (R) Irrigation Operations Support II'- To be determined. Project preparation Irrigation (Bank) Second Phase of nine-year operations and way. Administration maintenance support program, with (NIA) special emphasis on development of irrigator associations to assume direct responsibility for operations and management of parts of all major national systems. Environmental Assessment Category B. Department of 80.0 Rural Infrastructure - To reduce poverty Consultants have Project preparation Public Works and (Bank) and accelerate development in the rural completed preparation. way. Highways (DPWH) areas through: (a) provision of basic infrastructure (rural roads, minor drainages, etc.) through improved targeting of DPWH investments in line with the geographical distribution of poverty; and (b) employment generation in construction through increased civil works. Environmental Assessment Category B. - 75 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project 3 Consulting Services Action on Procurement 4 PHILIPPINES (Cont'd) Department of 25.0 (R) Land Reform Support - To provide Consultants, with Project preparation under Agrarian Reform (Bank) managerial, technical and financial experience in tree crop way. (DAR) assistance to smallholder beneficiaries estate management and (Japan T.A. Grant of agrarian reform; as well as to smallholder Facility has committed smallholder outgrowers in the vicinity organization, required funds for preparation of estates to be transferred. for project preparation. assistance.) Environmental Assessment Category B. National 90.0 (R) Rural Electrification - A consultancy for a Negotiations in progress. Electrification (Bank) Revitalization project to finance the rural electrification Administration uncovered portion of the Sector's master plan has begun (NEA) investment program for 1992-94. The using USAID financing. loan would include components for The same consultancy financing institutional development for will address accounting NEA and the Rural Electric Coops (REC). weaknesses in some 40 Environmental Assessment Category C. RECs. Other consultancies to be determined. Department of 150.0 (R) Highway Management - Upgrade, Consultant services Negotiations completed on Public Works and (Bank) rehabilitate, and strengthen 1400 km of required for: (a) road October 1, 1991. Board Highway (DPWH) arterial highways, provision of management system; presentation scheduled specialized equipment for road and (b) design and for December 20, 1991. bridge inspection and evaluation. construction Strengthen DPWH management of highway supervision; (c) project network. Strengthen environmental coordination; management and the construction (d) training; industry. Environmental Assessment (e) environmental Category B. assessment; and (f) strengthening construction industry. Department of 30.0 (R) Technology Development - The project Consulting services Project preparation under Science and (Bank) would stimulate more rapid technology required for: way. Technology development in industry through building (a) identification and links between key technology analysis of appropriate institutions and industry, and through ways of stimulating creation and restructuring of key productivity institutions in the technology improvement; and infrastructure. No adverse (b) more appropriate environmental effects. Environmental institutional Assessment Category C. arrangements and policies for industrial technology development. Department of 85.0 (R) Engineering and Science Education - Consultants required for Negotiations completed on Science and (Bank) To improve science and technical project preparation and December 5, 1991. -Board Technology education at graduate, undergraduate and implementation. presentation scheduled secondary education levels on a for January 28, 1992. selective basis as well as increase (Co-financing being capacity to produce high quality science explored with Overseas and engineering graduates for research Economic Cooperative Fund and teaching; environmental education (OECF)). would also be strengthened. Environmental Assessment Category C. - 76 - Member Country, Amount & Implementing Probable Stage of Processing ar Agency Lender 2 Project ' Consulting Services -Action on Procurement PHILIPPINES (Cont'd) National Manpower 36.0 (R) Second Vocational Training - Consultant services will Appraisal report is un and Youth Council (Bank) (a) Strengthening the policy, planning, be required. preparation. (NMYC) and management, research and evaluation (Co-financing being Department of capacity of the National Manpower and explored). Education, Culture Youth Council; (b) improving training and Sports (DECS) standard and cost recovery: (c) rehabilitating existing facilities and expanding training program; and (d) undertaking a sector project preparation study. Better trained technicians are expected to assist with environmental control systems and the project would also attempt to increase access to technical training for women. Environmental Assessment Category C. Philippine Long 134.0 Telephone System Expansion - Provide Consulting requirements Negotiations scheduled Distance Telephone (Bank) long distance telecommunications are expected to be for January 6, 1992. company (PLDT) equipment, telephone exchanges and minimal. cables for about 100,000 new telephone lines in PLDT's system throughout the Philippines. Environmental Assessment Category C. SOLONDN ISLANDS Ministry of 5.0 Third Education - To assist with: To be determined. Identification under v Education and (IDA) (a) consolidation of primary schools: Human Resources (b) primary teacher in-service training: (MEHRD) (c) upgrading the quality of existing secondary schools; (d) the supply of educational materials; (e) management and planning training: and (f) in the health sector training of nurses and health workers. Environmental Assessment Category C. Ministry of 2.8 Housing - To formulate housing and Consultants are being Identification missior Housing and (IDA) urbanization policies, strengthen sector selected by UNCHS for completed. Governmeni Government institutions and provide affordable project preparation agreed with UNDP and Services housing to low-income families. Scope study. UNCHS on project of environmental assessment work preparation study. required to be determined. (Co-financing of Environmental Assessment Category B. US$2.5 million has bee secured from EDF.) -77- Member Country, Amount & Implementing Probable Stage of Processing and, Agency ' Lender 2 Project Consulting Services Action on Procurement 4 SRI IANKA Road Development 35.0 (N) Highway Maintenance - Will aim to: Consulting services will Project under Authority (IDA) (a) strengthen road maintenance be required for preparation. capabilities; (b) address human resource preparation of A PPF of US$0.3 million and institutional development issues; maintenance program, may be requested. and (c) restructure the local feasibility studies, and (Cofinancing will be maintenance contractor industry. Would maintenance explored.) also finance: (a) technical assistance; reorganization and (b) part of a five year program of management study. periodic maintenance and rehabilitation Consultants for project program; laboratory tools and preparation to be maintenance works; and (d) training financed under possible components. Environmental Assessment PPF and bilateral Category B. grants. Ministry of 50.0 Private Sector Development - To promote Consulting services will Project is in early Finance/Ministry (IDA) the development of the private sector be required for policy stages of preparation. of Industry through policy and tariff reform, and tariff reform, Sciences and provision of term credit and technical institution building and Technology assistance for rehabilitation of enterprise existing enterprises. Project rehabilitation. components will increase the outward orientation of the private sector and enhance its role in the provision of social sciences and infrastructure. Environmental Assessment Category C. Ministry of 60.0 Banking Sector Adjustment - Would Will probably include a Project is in early Finance (IDA) include components to: (a) restructure small technical stages of preparation. the two, large state-owned banks, assistance component to strengthen interest rates and monetary provide support for policy; (b) restructure the National strengthening two large Savings Bank; (c) strengthen Central state banks, Bank regulation and supervision; establishing a (d) Improve financial sector collection and mobilization and investment of long-term restructuring agency, funds; and (e) strengthen country's assisting pension plans accounting and auditing. Environmental and insurance companies Assessment Category C. with portfolio management, and strengthening the Auditor General's Office. National Water 20.0 (R) Community Water Supply and Consultants have Appraisal mission Supply and (IDA) Sanitation (formerly Rural Water Supply prepared District tentatively scheduled for Drainage Board and Sanitation) - Strengthen Development Plans, and February 1992. (NWSDB) planning/programming capability of an institutional Government and local authorities; framework, community develop mechanisms for Government mobilization, health policies on cost recovery and operations education, monitoring and maintenance develop and evaluation, and responsibilities for operations and training. Final reports maintenance capability in the local are due December 1991. authorities and user groups; to promote involvement of NGOs, the private sector, women increase coverage of water and sanitation in rural and small community subsector; and improve public health through provision of safe drinking water and adequate sanitation. Total project cost US$47.0 million but subject to possible reduction at appraisal. Environmental Assessment Category B. - 78 - Member Country, Amount & Implementing Probable Stage of Processing an4 Agency Lender 2 Project Consulting Services Action on Procurement SRI LANKA (Cont*d) Ministry of 50.0 Tree Crops Restructuring - The project To be determined. Project preparation un< Finance (IDA) would support restructuring of the way. treecrops subsector including: (a) breaking up of two large state plantation corporations into autonomous independent commercial entities; (b) infusion of private management into -22 smaller companies; (c) disposition of loss-making unviable estates; (d) development of divestitive plan for public companies; and (e) reform of sector-wide regulatory and incentive framework. Environmental Assessment Category B. Ministry of 35.0 Local Government Development - Project Consultants to prepare Project preparation un4 Finance (IDA) will provide technical assistance and an initial pipeline of way. LLDF Act will neo training to 308 rural and urban local projects for the LLDF amending in light of authorities (LAs) and technical have been appointed, and realignment of central assistance and a line of credit to the consultants to prepare ministries. restructured Local Loans Development the technical assistance Fund (LLDF). Sub-loans would finance LA and training components projects which are not suitable for are now being appointed private investment, e.g., roads, under Credit 1697-CE sidewalks, parks, playgrounds, drainage, (Municipal Management street lighting, municipal offices, Project.) public markets. LLDF would carry out an environmental assessment as part of its appraisal of sub-projects. Environmental Assessment Category B. Ministry of 25.0 (R) Agricultural Support Services - The Consulting services will Appraisal report under Agriculture, (IDA) project aims at restructuring be required to implement preparation. Development and agricultural extension services, the extension component Negotiations tentative Research strengthening seed development, and the agro-business scheduled for February streamlining pesticide management, and component. 1992. promoting agro-business opportunities to increase the production options for forming enterprises. No negative environmental impacts predicted. Environmental Assessment Category B. Ministry of 35.0 (R) Transport I - To include procurement Consultants were Appraisal mission Transport/Road (IDA) of equipment, spare parts and repairs appointed. rescheduled for April Development for railway operations; improvement of 1992. Authority traffic management in Colombo Municipality; and technical assistance Consulting services ar for transport planning. Total.project being financed under a cost US$286.0 million. Environmental IDA Project Preparatio impact is expected to be positive. Facility advance for a Environmental Assessment Category B. total of US$906,000. (Co-financing from OEC of US$80.0 million has been approved.) 79 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project s Consulting Services Action on Procurement 4 Petroleum 130.0 (R) Gas Transmission - To utilize Consultant services will Pre-appraisal mission Authority of (Bank) natural gas reserves in the Gulf of be required for completed. Appraisal Thailand (PTT) Thailand to meet the increasing energy implementation. mission in the field. demand in the central and southern regions. Environmental assessment Procurement: Invitation report completed. Draft is being to bid for procurement of reviewed. Environmental Assessment linepipe and coatings Category A. issued. Ministry of 87.0 Fourth Highway Sector - Would continue Consulting services will Appraisal report-under Transport and (Bank) support for country's highway be required for preparation. Communications development program for the 1992-96 plan supervision and period. Would also support implementation of action implementation of measures to improve plans. road traffic safety, reduce vehicular air and noise pollution, and improve efficiency of road transport industry. Environmental Assessment Category B. Ministry of 40.0 (R) Industrial Pollution Control - To Mid review concluded. Government implementing Industry (Bank) treat industrial waste water, Contract with satisfactory reforms. particularly hazardous waste water and consultants to be signed Project preparation under heavy metals which are most serious momentarily. Financing way. Danish environmental risks for the country and by Japanese Grant. International Development the Gulf of Thailand. Environmental Agency (DANIDA) trust Assessment Category A. funding requested and pending approval. Electricity 54.0 (R) Third Power System Development - Consultants have been Approved by the Executive Generating (Bank) Timeslice financing EGAT's investments appointed. Directors on December 10, Authority of in generation, transmission and mine 1991. Thailand (EGAT) expansion. Environmental Assessment Category A. Retroactive financina of up to USS6.0 million will be allowed. Ministry of 32.0 Tax Computerization - The project would Crown Agents (UK) Turn-key contract for Finance - Revenue (Bank) set modern tax procedures, implement a financed by the software and hardware was Department value added tax and improve the overall Government are assisting signed in July 1991. tax administration by providing adequate with project Project signing is software and hardware for all tax implementation. expected to be delayed charges. Environmental Assessment until February 1992. Category C. Agricultural Land 50.0 Land Reform and Forest Protection - To be determined. Project preparation under Reform Office (Bank) Project consists of two major way. (ALRO), Royal components: (a) to provide social, (Japan T.A. Grant Forestry infrastructural and production support Facility has committed Department (RFD) to occupants of degraded public forest funds for preparation lands alienated for agriculture; and assistance. Co-financing (b) the demarcation and protection of also being sought from priority conservation forests, wildlife Global Environment Fund.) sanctuaries and national parks. Environmental Assessment B. Provincial 40.0 (R) Distribution System Upgrading - To Consultants are in Approved by the Executive Electricity (Bank) upgrade PEA's transmission system. place. Directors on Authority (PEA) Environmental Assessment Category B. September 24, 1991. (Possible financing from the Global Environment Facility (GEF) -- see Annex C.) - 80 - Member Country, Amount & Implementing Probable Stage of Processing a Agency Lender Project Consulting Services Action on Procurement THAILAND (Cont'd) Provincial 40.0 Second Provincial Water Supply - Major Consultants have been Project under Waterworks (Bank) expansion of about 9 water supply recruited. preparation. Authority systems, provision of maintenance tools (Preparation co-Linan and equipment, institutional with Italian Governme development. Environmental Assessment Aid). TONGA To be determined 2.0 Petroleum Exploration Technical To be determined. Identification under (IDA) Assistance - Scope of project to be determined. Environmental Assessment Category: To Be Determined. VANUATU Department of 4.0 (R) Petroleum Exploration Promotion and Consulting services will Appraisal mission Geology and Mines, (IDA) Geothermal Development Technical be required for seismic scheduled for April 3 Government of Assistance - Seismic surveys and surveys, geochemical Vanuatu geochemical studies to determine the studies, economic and hydrocarbon potential of offshore financial studies for sedimentary basins; economic and geothermal development, financial evaluation of geothermal drafting of legislation, resource development; and promotion of regulations and model hydrocarbon exploration and agreements, project strengthening of involved institutions. management, and Environmental Assessment Category B. hydrocarbon exploration promotion. - 81 - Member Country, Amount & Implementing Probable Stage of Processing and Agency a Lender Project Consulting Services Action on Procurement III. EUROPE, MIDDLE EAST AND NORTH AFRICA REGION ALGERIA To be determined 75.0 Vocational Training II - Quality and To be determined. Preparation under way. (Bank) efficiency improvements in basic education. Assessment of quality teacher training and provision of pedagogical materials. Environmental Assessment Category: To Be Determined. Ministry of 150.0 (R) Agricultural Sector Adjustment - To be determined. Further project Agriculture (Bank) Would support medium-term agricultural preparation awaiting adjustment strategy through reforms in Government clearance. policies relating to land markets, prices, input and output marketing, and trade policy. Would identify studies for further reforms. Environmental Assessment Category B. Ministry of 50.0 Irrigation Management Support (IMSP) - Consulting services will Project identification t Equipment and (Bank) Project would support infrastructure be required. be carried out in Housing rehabilitation and institutional November 1991 with strengthening of regional authorities FAO/CP. responsible for operating existing large scale irrigation system. Environmental Assessment Category B. Ministry of 35.0 (R) Cadastre - Improve land registration Consultants likely to be Appraisal mission Economy, (National (Bank) system in urban as well as agricultural required for institution completed in October Agency for areas to faster the private investment building purposes. 1991. Cadastre (ANC), and provide an improved basis for land Conservation taxation. Environmental Assessment Financiere (CF)) Category B. Ministry of 75.0 Local Government Development - Consultants services are Project preparation und4 Interior and (Bank) Strengthen local capacities in planning, required to prepare a way. Environment budgeting and implementing investments training program for in infrastructure, housing and each wilaya and to study environmental protection and public the feasibility of services; increase generation of local investments in priority resources to reduce dependence on environmental sub- central government budget. projects. Environmental Assessment Category B. Ministry of 50.0 (R) Basic Education Institutional To be determined. IEPS issued on June 28, Education (Bank) Development - Contribute to enhanced 1991. Project quality and efficiency in basic preparation under way. education by improving effectiveness in targetted institutions (grade schools and teacher training institutes). Environmental Assessment Catemory C. - 82 - Member Country, Amount & Implementing Probable Stage of Processing i Agency ' Lender 2 Project 3 Consulting Services Action on Procuremen ALGERIA (Cont'd) Ministry of 30.0 Forestry and Watershed Management - Consultants required. Negotiations postpont Agriculture (Bank) Pilot project to (a) design environmentally sound and technically appropriate forest management and exploitation techniques to be used in subsequent larger scale operations; (b) reduce operating costs and strengthen forestry institutions; and (c) prepare erosion control/land management program. Environmental Assessment Category D. Ministry of 57.0 Sahara Development - To assist Consulting services Approved by the Execi Agriculture and (Bank) government in defining and implementing will be required. Directors on Ministry of an environmentally balanced water September 24, 1991. Equipment development plan of Northern Sahara; to of signing to be strengthen organizations dealing with determined. water management and control and to increase agricultural production through: (a) technical assistance and preparation of studies; (b) institution building; (c) rehabilitation of water extraction and distribution systems, and on farm development in existing oases. Environmental benefits will result from improved drainage, integrated pest management practices, proper use of available water resources, and better water management. Environmental Assessment Category B. Ministere de 20.0 Environmental Management - Provide Consultants required. Project under l'Interieur et de (Bank) technical assistance to strengthen the preparation. l'Environnment institutional framework for environmental management; provide assistance to industry for temporary storage of hazardous wastes and surveillance systems. Assist Government with establishment of water resource management system and water pollution surveillance. Environmental Assessment Category B. Ministry of 250.0 (R) Economic Reform Support II - To Consultants likely to be Appraisal reschedule Economy (Bank) support implementation of trade, price, required. March 1992. tax and enterprise reform measures. Trade reform will focus on rationalizing tariffs and liberalizing foreign exchange allocation. Price reform will support liberalization of price-setting in concert with the establishment of a mechanism to protect vulnerable groups' access to essential goods and services. Fiscal reform will focus on rationalizing direct and indirect taxes. Enterprise reform will focus on restructuring and financial rehabilitation. - 83 - Member Country, Amount & Implementing Probable Stage of Processing and Agency I Lander Project 3 Consulting Services Action on Procurement ALGERIA (Cont'd) Ministry of 125.0 Highways VI - (a) improve Wilaya To be determined. Project under Equipment (Bank) capabilities for road management and preparation. strengthen ME and Wilayas in program monitoring; (b) provide a more adequate balance between contracted and force account maintenance and foster increased competitiveness in the contracting of road works; and (c) rationalize transport sector planning and policy making. Appropriate conditions would be incorporated in the standard tender and supervision documents covering drainage and erosion, cultural property, borrowing pits, and materialsdisposal. Environmental Assessment Category B. Ministry of 100.0 Urban Transport Enterprise - Expansion To be determined. Feasibility studies to Transport (Bank) of the provision of bus services in main start in 1992. Algerian cities, through the: (a) rationalization of enterprises operating and management practices; (b) rehabilitation of existing bus fleets and acquisition of new buses; and (c) training and technical assistance for enterprise operations and financial management, and for the preparation of traffic management studies. The project is foreseen to have a positive impact on the environment, mostly as a result of reduced engine emissions arising from improved operation and maintenance of the bus fleets. Further measures to mitigate vehicle pollution, including fuel substitution, would be pursued through a study. Environmental Assessment Category B. Ministry of 125.0 Construction Industry - Foster the Consulting services will Project under Equipment/ (Bank) efficiency of construction industry by be required to carry out preparation. Credit Populaire improving its operational environment, industrial restructuring Algerien extending credit for modernization studies, and develop investments, promoting private sector training programs. initiatives, supporting the preparation of enterprise restructuring programs, and developing training program for enterprise managers. Ensure that investment projects financed by credit component take into account environmental concerns. Environmental Assessment Category B. BULGARIA To be determined 150.0 (N) Sector Adjustment II/Private Sector To be determined. Preparation under way. (Bank) Development (SAL II/PSD) - Project will: (a) strengthen the framework for private sector development; and (b) support creation of new private sector activities and privatization of state enterprises. Environmental Assessment Category C. - 84 - Member Country, Amount & Implementing Probable Stage of Processing i Agency I Lender 2 Project Consulting Services Action on Procuremen BULGARIA (Cont'd) To be determined About (R) Human Resources I (Education) - To To be determined. Project to be identi: 50.0 develop educational assessment (Bank) capability, upgrade educational facilities and resources, and support restructuring of higher education. Environmental Assessment Category C. To be determined 100.0 (R) Energy/Environment - Likely to To be determined. Project identificati (Bank) support improvements in the power and mission tentatively environment sectors including nuclear scheduled for early safety equipment, conversion of selected (Cofinancing may be plants from coal to gas, completion of a required.) hydro project, a sewerage/water project for Safia, the purchase of clean fuels, and energy conservation and environmental technical assistance. Environmental Assessment Category B. To be determined About Enterprise Reform and Private Sector To be determined. Project preparation 100.0 Development - To support creation and to begin. (Bank) growth of private enterprises, (Cofinancing may be privatization and restructuring of state required.) firms, and export development. Environmental Assessment Category C. To be determined About (R) Financial Intermediation - Support To be determined. Pre-appraisal missio 100.0 to modernize and strengthen the scheduled for March (Bank) Bulgarian banking system and improve its ability to mobilize and allocate financial resources efficiently. Environmental Assessment Category C. To be determined About (R) Agricultural Development - To assist To be determined. Appraisal mission 50.0 in increasing and stabilizing agricul- tentatively schedule (Bank) tural production for domestic supply and end January 1992. export of primary and agro-processed production through increased mechanization. Environmental Assessment Category B. CZECHOSLOVAKIA Slovak Power About (N) Second Power and Environmental Consulting services will Project was identifi Enterprise 300.0 Improvement - Project will provide for: be required for auditing November 1991. Pre- (Bank) (a) priority investment/upgrading in and corporate appraisal mission Slovakia, Industry and Redevelopment of restructuring of SEP, scheduled for June 1 Vojanv Power Station; (b) pollution the borrower. and appraisal missic control for De-nox waste disposal; scheduled for Octobe (c) transmission system upgrading; 1992. (d) system control center upgrading; and (e) training consultancy. Environmental Assessment Category B. To be determined 125.0 Agroindustry - Scope of operation likely To be determined. Project identificat] (Bank) to include investments and technical postponed. assistance for restructuring of agroindustrial enterprises. Environmental Assessment Category: To Be Determined. - 85 - Member Country, Amount & Implementing Probable Stage of Processing and Agency.1 Lender 2 Project Consulting Services Action on Procurement 4 CZECHOSLOVAKIA (Cont'd) To be determined About Telecommunications - Supports expansion To be determined. Project preparation under 150.0 and strengthening of national trunk and way. Appraisal mission (Bank) international networks to improve tentatively scheduled for congested telecommunications services March 1992. and provide service to businesses. Includes institutional strengthening of telecommunications enterprises and relevant government agencies. Environmental Assessment Category C. To be determined About (R) Financial Sector Adjustment Loan - To be determined. Project has been 200.0 Supports financial strengthening and postponed until the FY95 (Bank) restructuring of selected banks; Lending Program. Further automation of banks and State Bank; reporting will be institutional strengthening; discontinued. introduction of policy measures related to development of financial markets. Environmental Assessment Category C. To be determined About Power and Environmental Improvement - To be determined. Appraisal report under 200.0 Supports rehabilitation of existing preparation. (Bank) facilities, including environmental Negotiations tentatively component to improve air quality, and scheduled for January technical assistance for institutional 1992. development. Environmental Assessment Category B. Retroactive financing may be requested. To be determined About (R) Environment - Scope of this To be determined. Project preparation unde 200.0 operation likely to include support for way. Appraisal mission (Bank) institutional development, technical tentatively scheduled foi assistance for strategic and pre- June 1992. investment studies, and investments in (Possible financing from areas of municipal services, hazardous the Global Environment waste disposal facilities, and Facility (GEF) -- see reclamation of mined lands. Annex C.) Environmental Assessment Category A. EGYPM RA REPUBLIC OF Ministry of Health 56.7 (R) Health - Project would involve: Consulting services will Preparation under way. (IDA) (a) extension of systematic be required. Appraisal mission schistosomiasis control activities to scheduled for February five governates of the Delta Region 1992. through financing the extension of the national control strategy to the area; (b) rehabilitation of vehicles in other governates; and (c) development of an operational research program and management systems to reduce costs and ensure sustainability. Environmental Assessment Category C. Ministry of 73.2 (R) Basic Education (formerly Primary Consulting services will Preparation mission Education (IDA) Education) - Expanding access to primary be required. scheduled for January education and improving the quality, 1992. relevance and resource efficiency of the primary education programs. Environmental Assessment Category C. - 86 - Member Country, Amount & Implementing Probable Stage of Processing Agency Lender Project Consulting Services Action on Procuremez EGYP, ARAB REPUBLIC OF (Cont'd) Ministry of 21.6 (R) Matruh Resource Management - Consulting services for Project preparation Agriculture and (IDA) Promotes sustainable agriculture in feasibility study are way. Land Reclamation northwest coastal zone by improved financed through a management of rainfall and groundwater Japanese and UNDP and of rangelands. No adverse or grants. environmental impact are expected. Environmental Assessment Category BID. Principal Bank for About Agricultural Modernization - Supports To be determined. Project preparation Development and 100.0 selective mechanization in farming and way. Agricultural (Bank) processing and upgrading of agricultural Credit support services. Environmental Assessment Category B. Egyptian Public About (R) National Drainage Program - The Consulting services will Approved by the Exec Authority for 45.0 twelve year program will cover about 2.1 be required and expected Directors on Novembe Drainage Projects (Bank) m feddans of tile drainage; remodelling to be financed through 1991. 75.0 of open drains, rehabilitation of tile bilateral assistance (Co-financing throul (IDA) drainage networks of about 0.6 m services, bilateral assistancE feddans, provision of auxiliary be provided by FRG z equipment and rehabilitation of PVC pipe Netherlands.) factories; and technical assistance for design, research and training. The proiect does not pose any environmental hazard to the region or the country. Potential negative environmental impacts were addressed by the appraisal mission. Environmental Assessment Category B. Egyptian About (R) Kureimat Power - Project will Consultants will be Negotiations schedul Electricity 220.0 consist of: (a) the supply and required for technical for December 16, 19! Authority (Bank) installation of a net 1200 MW dual fuel- assistance, training, (Co-financing fired (fuel oil and natural gas) power financial management arrangements with A] station; (b) the supply of material and systems, and management AF, USAID and Saudi equipment for a natural gas pipeline information systems. Government have beei interconnecting the power station to the finalized.) gas grid; (c) the supply and installa- tion of equipment for transmission lines, line loss reduction, and rehabilitation of a substation and (d) technical assistance. Final environmental impact assessment report completed in July 1991. Environmental Assessment Category A. Building Materials About Industrial Pollution/Energy Conservation Consulting services will Technical audits to Organization 100.0 - Debottlenecking and modernization at be required.Consultants identify investment (Bank) three cement plants, training and are already involved in options at plants ni 60.0 environmental protection components and project preparation under way, and part (IDA) policy reforms covering pricing activities. Consulting environmental prepa: distribution and management. Total services for project completed through K project cost about US$300.0 million. implementation and financed study. Environmental Assessment Category A. further policy studies Preparation of tzat may be required. component under way market studies and further environment programs will be re, prior to appraisal. (Co-financing would sought). - 87 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender Project . Consulting Services Action on Procurement 4 EGYPT, AA REPUBLIC OF (Cont'd) Ministry of About West Nubaria Agriculture Intensification Consultant services Project preparation under Agriculture and 40.0 - Intensify crop production, raise likely to be required. way. Government to Land Reclamation (IDA) yields, and introduce oilseed crops in complete field studies West Nubaria reclaimed lands. Social for drainage component. and environmental impact positive. Environmental Assessment Category B. Ministry of About (R) Tourism Sector Restructuring and Consulting services will Appraisal mission is Tourism, Tourism 125.0 Privatization (formerly Tounam Sector not be required. tentatively scheduled for Development (Bank) Restructuring and Privatization) - January 1992. Authority Project would support the implementation of a long term strategy and policy for tourism development in Egypt. Would establish a Tourism Development Fund to provide long term financing to private sector developers and provide needed technical assistance. Environmental impact studies are being undertaken. Environmental Assessment Category B. Prime Minister's About (R) Structural Adjustment - Support of To be determined. Approved by the Executive Office 300.0 government reform program aimed to Directors on June 21, (Bank) achieve growth and stabilization, while 1991. Loan was signed on easing social impact on lower income November 22, 1991.. groups. (Co-financing provided by African Development Bank and European Economic Community). Ministry of About Northern Sinai Agricultural To be determined. Initial project Agriculture and 65.0 Development - As first phase of the preparation completed. Land Reclamation (Bank) agricultural development of Northern Timing of further Sinai, the project would expand the processing subject to agricultural base of the country and confirmation of include construction of irrigation and Government's interest in drainage works and provision of Bank financing for the financial support to farmers for on-farm project. development farm machinery and (Co-financing would be agricultural inputs. Two studies are sought). being carried out to assess the environmental impact of the project - one on migratory birds and the other on the effect on wetlands including the Bardawil Lake. Appraisal mission will take recommendations of these studies into consideration. Environmental Assessment Category A. River Transport About Navigational Canal Improvements - Consultants selected for Project preparation under Authority (RTA) 50.0 Rehabilitation of the Damietta-Cairo project preparations, way. Phases I and II (Bank) Branch of the Nile, including deepening and Phase IV contract completed. Phase III of the branch, improvement of docks, signed. ongoing. cargo handling equipment, navigational aids on the Nile River, and technical assistance. Environmental Assessment Category B. - 88 - Member Country, Amount & Implementing Probable Stage of Processing ar Agency ' Lender Project Consulting Services Action on Procurement EGYPT, ARAB REPUBLIC OF (Cont'd) Ministry of About Railways III - To assist Government in Consultant services will Negotiations schedulec Transport 200.0 improving efficiency of railway be required for for March 3, 1992. (Bank) operations. It includes track renewal financial and tariff (Parallel financing Is and supply of spare parts for traction, studies, traffic being sought). rolling stock and workshop equipment, costing, economic replacement of old locomotives and analysis and coaches and other similar equipment. supervision. The project would yield environmental gains through diversion of traffic from roads to railway and replacement of old locomotive with diesel and electric powered units. Environmental Assessment Category C. HUNGARY Ministry of 120.0 (R) Health - Would assist the Government To be determined. Project preparation u Welfare (Bank) in restructuring the health sector and way. Appraisal missi, strengthening the institutional capacity tentatively scheduled of the Ministry of Welfare and National June 1992. Social Insurance Administration through reforms in public health promotion, primary health care delivery, rationalization of hospital care and health care management and financing. Environmental Assessment Category: To Be Determined. To be determined 40.0 Product Market Development - Would To be determined. Appraisal now schedul (Bank) provide financing for private sector for January 1992. companies to restructure their Negotiations tentativ wholesaling and retailing operations and scheduled for April 1 define a medium-term strategy for the development of the trading industry. Environmental Assessment Category B. Ministry of 200.0 (R) Enterprise Reform - Support for Consulting services Negotiations tentativ Finance (Bank) efficient restructuring on the public will not be required. scheduled for January enterprise sector, including enterprise 1992. governance reform and a realistic privatization program. Environmental Assessment Category C. To be determined 125.0 (R) Transport Sector - To alleviate To be determined. Preparation under way (Bank) environmental impact of growing . Appraisal mission transport, and restructure the railways. tentatively schedule4 Project components likely to include April 1992. continuation of road strengthening program, railway electrification, intermodal facilities, rail track upgrading, plus ticket machines, control systems and studies to improve urban public transport. Environmental Assessment Category A. - 89 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender * Project Consulting Services Action on Procurement 4 HUNGARY (Cont'd) To be determined About Second Financial System Modernization - Consulting services Preparation under way. 100.0 Will follow up on first project, will be required for Appraisal mission (Bank) including support for: (a) commercial project preparation and tentatively scheduled for banks in areas of institutional and MIS processing. June/July 1992. development and strengthening of portfolios; (b) banks supervision agency: and (c) further development of securities market; including strengthening of institutional investors. Environmental Assessment Category C. To be determined 125.0 (R) Energy Environment - To support Consulting services Preparation under way. (Bank) development and implementation of will be required for Appraisal tentatively appropriate environmental policies in project preparation, scheduled for July 1992. the power sector, and finance power including the generation, selective expansion of preparation of capacity, dispatching and distribution, environmental impact upgrading emission control equipment and studies. some district heat upgrading. Environmental Assessment Category A. JORDAN Social Development About Social Development - Follow-up to social Consulting services will Appraisal report under Fund 5.0 component (mitigating impact of be required for project preparation. (Bank) adjustment on economically expansion and (Germany's KfW has agreed disadvantaged) of Industry and Trade reappraisal. to co-finance Policy Adjustment Loan. Will complete US$10.0 million institutional development and initiate equivalent and lending for productive activities US$5.0 million equivalent benefitting particularly women and rural from EC.) poor. Environmental Assessment Category C. MOROCCO To be determined About (N) Rural Poverty Reduction - The Consulting services will Project is in 30.0 project would provide for economic be required for project identification stage. (Bank) opportunities and social services to the preparation. IEPS under preparation. rural poor, in particular in mountain (GEF cofinancing to be areas, while at the same time protecting determined.) the biodiversity environment. Also, construction of a rural road access network as a key condition for Bank support. Environmental Assessment Category D. To be determined To be Industrial Technology Enhancement - To be determined. Components are being deter- Project will support the development of identified. mined metrology, standards, testing and quality insurance infrastructure. It will also promote industrial research and development, by making research activities more market based. A venture capital fund may be set up to finance innovative technological projects and new enterprises. Environmental Assessment Category: To Be Determined. - 90 - Member Country, Amount & . Implementing Probable Stage of Processing an Agency ' Lender 2 Project Consulting Services Action on Procurement MOROCCO (Cont'd) To be determined 25.0 (R) Research and Extension In Irrigated To be determined. - Project preparation un (Bank) Areas - Project would provide funding way. for: (a) strengthening extension services of the regional irrigation authorities (ORMVA) and promote the participation of farmers' organizations and the private sector in the development and dissemination of improved technology (b) an applied research program; (c) staff and farmer training; (d) complementary investments to extend soil testing and develop appropriate mechanization; (e) establishment of a monitoring system; and (f) studies. Environmental Assessment Category B. Ministry of 100.0 Second Agriculture Sector Investment To be determined. IEPS to be prepared. Agriculture and (Bank) (ASIL II) - Loan is in support of a Agrarian Reform tranche of Morocco's investment program in agriculture. It would also promote further sector policy and institutional reforms. Environmental Assessment Category: To Be Determined. Ministere de 100.0 (R) Wastewater Irrigation - The project Consulting services will IEPS issued. l'Information et (Bank) would be a follow-up to the be required for project Government's request de l'Interieur implementation of sewerage and primary preparation, including awaited for a Project treatment facilities for Casablanca and the preparation of Preparation Facility. Agadir and would include: environmental impact (a) additional treatment as required; studies. (b) irrigation systems; and (c) institutional development aiming to set up appropriate organizations for implementation, operation and maintenance. Environmental Assessment Category AID. To be determined 30.0 Labor Market Intermediation - To be determined. Project preparation tu (Bank) Development of labor market information way. and intermediation mechanisms to increase mobility and access to jobs, facilitate small-scale job creation, and promote in-service training. Environmental Assessment Category C. ONPT 50.0 (R) Second Telecommunications - To Consulting services Project preparation n (Bank) support sector restructuring (including may be required. way. promotion of private sector investment in value-added services and development of a new legal and regulatory framework) and to finance expansion of network, with possible parallel financing from multilateral and bilateral agencies. Environmental Assessment Category B. To be determined 50.0 Higher Education Funding Reform - Aims To be determined. Preparation under way (Bank) at diversifying higher education financing by promoting cost efficiency, and supporting qualitative improvements. Environmental Assessment Category C. - 91 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement 4 (Cont'd) ONCF 60.0 First Railway - Would contribute to To be determined. Project preparation under (Bank) improving use of existing way. infrastructure, reducing costs and (Co-financing being ensuring financial viability of railway. sought. Preliminary Environmental Assessment Category B. contacts made with the African Development Bank, Japan EXIM Bank.) Ministry of 35.0 National Watershed Management - To To be determined. Project being identified. Agriculture and (Bank) improve land use and natural resources Agrarian Reform management in mountain areas and reduce siltation in reservoirs and associated hydraulic infrastructure. Main components would include: (a) institutional and organizational development; (b) improvement of legal framework for land use in mountain areas; (c) investments in selected watersheds; (d) applied and adaptive research and extension; and (e) technical assistance and training. Environmental Assessment Category D. Credit Immobiler 100.0 (R) Housing Finance III - Project aims To be determined. Preparation postponed. Hotelier (CIH) and (Bank) to improve housing conditions in low Commercial Banks income communities, further develop the (To be determined) housing sector, and encourage commercial banks to participate in mortgage lending in the context of the reform of the financial sector. Environmental Assessment Category: To Be Determined. CNCA/Other Banks 150.0 (R) National Rural Finance - Consultant services will Project identification (Bank) (a) Assistance to Credit Agricole of be required in WID completed. Preparation Morocco (CNCA) to develop the activities, banking to begin in 1992. sustainable foundations of a high training, and quality and competitive intermediary institutional building. within a progressively liberalized financial system in the country. (b) Line of credit to CNCA/other banks to support agricultural/agro-industry credit lending to the private sector. Environmental Assessment Catexory B. Office National de 100.0 Fifth Water Supply - Urgent To be determined. Project under 1'Eau Potable (Bank) rehabilitation works and some new preparation. (ONEP) and Regies facilities and social connections program works and studies on water resource planning, development and management. Improvement of hydrologic and meteorologic data gathering and analysis, and a sanitary education campaign. Environmental Assessment Category: To Be Determined. Ministry of 100.0 Second Large Scale Irrigation - Consultants being Appraisal scheduled for Agriculture (Bank) Will complete the infrastructure recruited. end 1991. rehabilitation and management restructuring of the Regional Offices for Agricultural Development. Environmental Assessment Category B. - 92 - Member Country, Amount & Implementing Probable Stage of Processing ar Agency ' Lender 2 Project I Consulting Services Action on Procurement MOROCCO (Cont'd) To be determined 200.0 (R) Second Public Enterprise To be determined. Project has been remoi (Bank) Rationalization - Will support further from the Lending Progi policy and restructuring programs for Further reporting will public sector enterprise. Environmental discontinued. Assessment Category B. To be determined 200.0 (R) SAL II - Support adjustment in Consulting services will Negotiations schedulec (Bank) public expenditures, trade policies and be required for studies. for January 1992. Boa social sectors, ensure the efficient presentation schedule( deployment of public investments and for February 1992. consolidate the return of the economy to (Co-financing being sustainable growth. Environmental explored). Assessment Category C. Ministry of About (R) Municipal Finance (FEC II) (formerly To be determined. Project preparation Interior/Fonds 120.0 Municipal Development II) - Project aims advanced. Appraisal d'Equipment (Bank) to improve urban infrastructure, mission scheduled for Communal continue improving local management and mid-1992. intergovernmental finance, and enable commercial banks to lend to local governments and agencies. Environmental Assessment Category B. PAKISTAN To be determined About Private Sector - To assist the To be determined. IEPS to be issued ear 100.0 Government and financial institutions in FY93. (Bank) delivering better instruments for credit delivery to the private sector and to all sectors. Environmental Assessment Category: To Be Determined. Directorate of About (R) Balochistan Primary Education - Will Consulting services will Project preparation u Primary Education, 76.4 support primary education development in likely be required for way. Balachistan (IDA) Balochistan with particular emphasis on implementation. Department of girls' schooling. Project will likely Education support policy measures, planning, and management reforms to increase girls' access to schooling. Environmental Assessment Category C. Water and Power 150.0 Ghazi-Gariala Hydropower (GGHP) - Consultants (comprising Project feasibility a Development (Bank) Project would provide for construction a joint venture of 5 completed in May 1991 Authority of: (a) a Barrage, on Indus River, firms) have been working Preparation of detail about 7 km d/s of Tarbala dam; (b) a on project preparation designs and tender 53 km long single concrete lined power since February 1990. documents is in progz channel; (c) a power complex with and scheduled to be 1425 MW power house (5 units of 285 MW completed by August 2 each) and 15 M.C.M. capacity of head ponds. Environmental Assessment Category B. To be determined About (R) Punjab Environment - Arrest decline Consultants being Preparation mission I 100.0 of urban environment through hazardous evaluated for project the field during Dece (Bank) waste control, ground-water resource preparation. 1991. 30.7 protection, public awareness and EPA (IDA) strengthening. Project will comprise investments in toxic/hazardous waste clean up and processing, industrial wastewater collection and treatment and technical assistance for institutional strengthening. Environmental Assessment Category A. - 93 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project s Consulting Services Action on Procurement 4 PAKISTAN (Cont'd) Pakistan Telegraph About Telecommunications Sector To be determined. Preparation under way. and Telephone 100.0 Restructuring - To assist PTC in its Corporation (Bank) transition into a fully autonomous commercial company and support Government's objectives to develop a sound sector policy, including Pakistan Telecommunications Corporation (PTC) privatization, the sector liberalization, and regulatory framework requirement. Also, assist in expanding and improving telecommunications network. Environmental Assessment Category: To Be Determined. To be determined About (R) Family Health II - To increase the Consultants likely to be Pre-appraisal mission 77.3 availability and quality of maternal required for preparation scheduled for end January (IDA) health services including family and implementation. 1992. planning, improve the quality and integration of primary health care services, and strengthen institutional capabilities in Punjab and Balochistan. Environmental Assessment Category C. To be determined About Financial Sector Adjustment II - Policy To be determined. Preparation under way. 200.0 loan to support reform program in the IEPS issued on (Bank) financial sector. Follow up loan to September 13, 1991. FSAL I. Environmental Assessment Category B. To be determined About Private Sector Energy Development II - To be determined. Identification mission 160.0 Will focus essentially on strengthening scheduled for January (Bank) institutions in Pakistan which will 1992. participate in private sector investments in the energy sector. Environmental Assessment Category B. Water and Power About Power Sector Development - Consulting services Appraisal mission Development 150.0 Implementation of a time-slice (FY93-96) will be required. scheduled in early Authority (Bank) of WAPDA's least-cost investment January 1992. program, and restructuring program for (Co-financing expected.) WAPDA. Would also include a technical assistance component. Environmental Assessment Category B. Ministry of About Public Sector Adjustment - Operation to To be determined. OC review completed. Finance 50.0 support Government's macroeconomic Discussions with (Bank) program focussing on public resource Government continuing. 150.0 mobilization, the level and composition (IDA) of public development expenditures, and the policy, institutional and public expenditure framework needed to bring about a significant and substantial improvement in social conditions. Environmental Assessment Category C. -94- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project 3 Consulting Services Action on Procurement 4 PAKISTAN (Cont'd) To be determined About (R) Integrated Hill Farming II - Project To be determined. Preparation report 51.0 will include provision of inputs and received from FAO/CP. (IDA) support services for increased food and Pre-appraisal mission fodder crop production, strengthening of tentatively scheduled ii extension, animal health services and early 1992. input distribution, afforestation of demarcated forests and hillside planting for fuelwood, construction of feeder roads and soil conservation works and technical assistance for project implementation. Environmental Assessment Category B. Punjab Department 100.0 (R) Middle Schooling - To improve the Consultants likely to be Negotiations scheduled of Education (IDA) quality of the delivery of lower required for execution. for January/February secondary education in the Punjab 1992. through improved planning, management and administration of schools, supervision, and enhanced educational materials. Environmental Assessment Category C. Water and Power About (R) Irrigation/Drainage I - Subsurface Consultants will be Final version of Development 31.8 and surface drainage, water conservation required for project feasibility report Authority, Punjab (IDA) through canal lining, provision of implementation. received late March. Irrigation interceptor drains, and watercourse Appraisal mission Department improvement in the Fordwah/Eastern returned early August Sadiqia (South) canal command area in 1991. Follow-up missic Punjab Province. Phase 1 would include in the field during water conservation measures, a October 1991. Data frc monitoring program, and additional Government still awaite preparation work for the subsurface drainage system to be implemented under a separate Phase 2 project. Environmental effect of Phase 1 expected to be positive. Environmental Assessment Category B. Government of About Environmental Protection and Resource Consultants will be Appraisal report under Pakistan - 46.3 Conservation - Protection and management required for project preparation. Environmental and (IDA) of environmental resources in Pakistan. implementation. Negotiations have been Urban Affairs Positive environmental impact expected. rescheduled to Februar3 Division Environmental Assessment Category D. 1992 to allow Governmez to hire key project staff. National Housing About (R) Low-Income Communities Consultants have been Funds obtained from Ja Authority together 71.3 Infrastructure - Area upgrading and appointed, and Switzerland for with respective (IDA) basic urban services for squatter preparation. Provincial communities. To facilitate mechanisms (Co-financing of up to Governments for land markets and shelter development US$200.0 million may b4 in urban and high density rural areas. required for Land tenure and user fees for services implementation). to be addressed. Positive environmental impact expected. Environmental Assessment: To Be Determined. - 95.- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender a Project Consulting Services Action on Procurement 4 PAKISTAN (Cont'd) Government of About (R) Sindh Urban Development - Project Consultants have been Post appraisal mission Sindh (GOS) 99.8 would: (a) introduce fiscal and appointed. scheduled for January (IDA) administrative policy and institutional 1992. reforms in GOS through: (i) resource (U.S. Trade & Developmet mobilization; (ii) decentralization of Program (US$500,000) an( some provincial authority to local Japanese Grant Facility government; (iii) improvement of grants (US$1.8 million institutional capacity of Government of equivalent) have been Sindh (GOS) (including Karachi approved for financing Development Authority (KDA)) and Karachi project preparation.) Metropolitan Corporation (KMC) including setting up a technical unit in GOS for Retroactive financing 1 project appraisal and supervision; eacted. (iv) preparation of urban transport development in Karachi; and (b) finance sub-projects proposed by GOS and the local government on the basis of eligibility and appraisal criteria agreed during project appraisal. Positive environmental impact expected. Environmental Assessment Category B. Karachi Port Trust About (R) Karachi Port Modernization - Consultants will be Approved by the Executi (KPT) 91.4 (a) construction of quay side pavements, required for second Directors on May 30, (Bank) a new oil terminal replacing two stage computerization 1991. Loan was signed outdated ones, and new land side and institutional November 27, 1991. The approach roundabout (Jinnah Bridge Phase strengthening, Borrower is working on II); modification of access road to preparation of tenders the subsidiary Loan Keamari Groyne (b) procurement of a new on handling of cargo by Agreement to be signed dredging plant - radar, and related the private sector between GOP and KPT whi equipment, computers marine operators, KPT's is one of the condition environmental protection equipment and institutional of effectiveness of the spare parts; and (c) training and strengthening, radar and loan. technical assistance. Environmental related equipment for problems regarding pollution in the port the Port, environmental Retroactive financing a and Karachi harbour have been reviewed protection, Master US$4.1 million from the in detail and corrective measures are Planning of Karachi Port Bank for the Oil Pier a included in the list of covenants including dredging consultants' contract b negotiated. Environmental Assessment study, privatization of been included in the Category A. cargo handling, and project- technical assistance in port operations and maintenance as well as trade facilitation measures. Oil and Gas About (R) Domestic Energy Resource Development Consultants will be Negotiations began on Development 180.0 - Support of oil and gas development in required for project December 9, 1991. Corporation (OGDC) (Bank) identified joint ventures and corporate Implementation. restructuring of 0GDC. Environmental Retroactive financing Assessment Catemory A. envisaged for developm. drillinZ and reservoir ensineering. To be determined About Industry and Trade Adjustment - Consulting services Preparation under way. 200.0 Adjustment loan to promote further required for (Bank) reforms aimed at improving industrial preparation/appraisal. sector efficiency. Environmental Assessment Category C. - 96 - Member Country, Amount & Implementing Probable Stage of Processing an Agency Lender Project ' Consulting Services Action on Procurement POLAND Ministry of 100.0 Forestry Development - To implement a To be determined. Project preparation un Environmental (Bank) program of environmentally sound forest way. Protection, management through the restoration of Natural Resources damaged forest areas, intensification of and Forestry silvicultural treatments, and privatization of sector activities. Environmental Assessment Category B. To be determined 150.0 Infrastructure For Exports - Project To be determined. Project preparation ur (Bank) would assist Government efforts to way. improve exports relating to deficient (Co-financing may be infrastructure, including modernization/ required.) expansion of border crossing points, modernization of Polish section of Warsaw/Berlin railway, intermodal transport development and road access to Gdansk/Gdynia ports in order to enhance exports. Environmental Assessment Category C. Ministry of Health About (R) Health - To support the Government's To be determined. Appraisal report under 116.3 program for health system reform and preparation. (Bank) restructuring, through health promotion, Negotiations planned I development of primary health care, first quarter of 1992. health policy and management and A PPF of US$1.5 millic creation of regional health services. has been approved. Environmental Assessment Category C. except for Regional Health Services which is Category B. Ministry of 200.0 Agricultural Sector Adjustment - To To be determined. President's report und Agriculture and (Bank) support Government reforms in the preparation. Food Economy agricultural sector. Environmental Negotiations expected Assessment Category C. when new Government is office. (Co-financing with EC- PHARE possible.) To be determined 100.0 Cogeneration - Privatization and Consulting services may Project preparation ur (Bank) restructuring of combined heat and power be required for way. Appraisal missic plants. Environmental Assessment feasibility studies, tentatively scheduled Category B. February 1992. To be determined About Industrial Environment - Support for To be determined. Project preparation ur 150.0 privatization and restructuring of major way. (Bank) industrial polluters. Environmental (Co-financing from EBI Assessment Category B. possible.) To be determined About (R) Private Sector Development - Line of To be determined. Board presentation 62.0 credit for efficient investments for tentatively scheduled (Bank) start-up and expansion of private sector February 1992. enterprises, and technical assistance for institutional development. Environmental Assessment Category B. Ministry of About Structural Adjustment Loan II - Further To be determined. Project preparation ur Finance 300.0 support for the government's economic way. Appraisal missic (Bank) transformation program. Environmental tentatively scheduled Assessment Category C. May 1992. - 97 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender Project 3 Consulting Services Action on Procurement POLAND (Cont'd) Ministry of About (R) Housing I - To support gradual Consultants for Appraisal report Special Economy 200.0 development of a market-based housing assisting in project completed. Negotiations and Construction (Bank) system through the creation of housing implementation postponed pending contact finance services, and an increased role preparation from to be made with new for the private sector in housing Japanese Grant Facility, Cabinet. construction. Environmental Assessment USAID, UNDP, and others. (Co-financing under Category C. consideration.) ROMANIA To be determined 100.0 (R) Employment - Development of To be determined. Identification mission (Bank) employment and training services to ease scheduled for February transition to a market economy. 1992. Environmental Assessment Category C. Ministry of 150.0 (R) Private Sector Development and To be determined. Project preparation under Economy and (Bank) Enterprise Reform - Policy-based way. Appraisal mission Finance, Ministry operation to support Government's tentatively scheduled for of Resources and strategy to restructure the industrial June 1992. Industry, National and corporate sector and stimulate (Cofinancing may be Agency for private sector development including required.) Privatization and policy, regulatory and institutional Small and Mid-Size aspects, and technical assistance. Enterprises Environmental Assessment Category C. To be determined 100.0 (R) Private Farmer Support - Medium and Agricultural Economist Appraisal mission (Bank) long term credit to private farmers and and Marketing Specialist scheduled for January to viable rural, small and medium consultants from 1992. enterprises. Also, institutional Japanese and Dutch Trust (Cofinancing from EC- support and technical assistance. Funds. PHARE and EBRD being Environmental Assessment Category B. explored.) Ministries of About (R) Infrastructure Technical Consultants will be Negotiations scheduled Communications, 13.5 Assistance - Support sector reform and needed during project for mid-December 1991. Public Works, (Bank) prepare Bank infrastructure loans Implementation. (Co-financing with EC Transport, and through the provision of technical PRARE and Japan Finance and assistance and training. Environmental possible.) selected Assessment Category C. autonomous Retroactive financing of enterprises up to USS1.0 million recommended for expenditures incurred after July 1. 1991. Ministry of 300.0 (R) SAL - Support policy reform for Consulting services Pre-appraisal mission in Finance (Bank) development of a market economy, will not be required. the field. deregulation, reduction in the role of the state and development of the private sector. Environmental Assessment Category B. TUNISIA Ministry of 80.0 (R) Agricultural Sector Investment Consulting services First preparation missio3 Agriculture (Bank) (ASIL) - Would support policy reforms in likely to be necessary scheduled for early four key areas: (a) irrigation and for natural resource February 1992. water use efficiency; (b) natural component. resources; (c) marketing/agroindustry; and (d) land tenure. Would also finance priority investments in the budget of the Ministry of Agriculture in these same areas. Environmental Assessment Category B. - 98 - Member Country, Amount & Implementing Probable Stage of Processing A Agency Lender 2 Project Consulting Services Action on Procuremen TUNISIA (Cont'd) To be determined 70.0 Second Forestry Development - Project To be determined. Preparation under va; (Bank) would improve quality and quantity of FAO/CP. wood production, reduce soil erosion and preserve wildlife through: (a) forest management; (b) forest plantation; (c) pilot forestry projects; (d) forest pasture and range improvement; (e) nature conservation and development of Ichkeul Park; and (f) institutional development. Environmental Assessment Category B. Ministry of 250.0 (R) Economic and Financial Reform Consulting services will Approved by the Execi Planning and (Bank) Support - Supports macro program to be required. Directors on Decembe Regional restore internal and external balances 1991. Loan was sign Development and program of reforms to liberalize December 13, 1991. trade and prices, develop financial (Co-financing of sector, make special incentives narrower US$100 million from and more cost effective, strengthen and EXIM and US$50.0 mil widen social safety nets, and strengthen from EEC; possibilit: debt management capabilities. German co-financing. Environmental Assessment Category C. Ministry of 15.0 (R) Northwest Rural Poverty Alleviation To be determined. FAO/CP identificatio: Agriculture (Bank) - In addition to consolidating the main preparation mission infrastructure components, objectives currently in the fie would be to: (a) alleviate poverty of rural areas in undeveloped north region; (b) promote women in development as women contribute significantly to region's agricultural output; (c) increase the rural population's income and employment opportunities; and (d) improve the environment through soil and water conservation and erosion control. Environmental Assessment Catemory B. Ministere de 75.0 Higher Education Restructuring - Aims To be determined. Appraisal report und 1'Education at des (Bank) at: (a) improving the quality of higher preparation. Sciences education by creating institutions more responsive to the needs of the country and restructuring existing curricula; (b) containing the growth of public expenditures by an increase of efficiency; and (c) developing planning and management capacities. Environmental Assessment Category C. Ministere de 65.0 National Flood Protection - The project Consultants' terms-of- Preparation under wa 1'Equipment at de (Bank) would have the following objectives: reference under 1'Habitat (a) developing a national strategy for preparation. flood control and protection; (b) minimizing flood damages by the construction of appropriate infrastructure; improving flood control operations and maintenancel and improving cost recovery. Environmental Assessment Category B. -99- Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender Project ' Consulting Services Action on Procurement TUNISIA (Cont'd) Ministere de 70.0 Water Resource Mobilization and Consultants will be Preparation under way. l'Agriculture (Bank) Management - The project would improve required for technical water resource management by addressing assistance in water existing problems on the efficiency of management. mobilization, allocation and utilization of water. The project would include physical works for water storage and waste water treatment, and reuse rehabilitation and installation of meters, studies and technical assistance. Environmental Assessment Category A. Societe Tunisienne 60.0 (R) STEG - Natural Gas Development - Consultants will not be Approved by the Executiv de 1'Electricite (Bank) Construction of gas pipeline (M'Saken- required. Directors on November 26, et du Gaz (STEG) Gabes) and consumer conversion program 1991. to natural gas. Environmental Assessment Category B. Development and 80.0 Industrial Finance - Provide long term Consultants will be Project preparation unde: Commercial Banks (Bank) financing to industry and tourism and required for way. (to be determined) enhance competition in Tunisian banking institutional system. Technical assistance envisaged development of for institutional development of participating banks. participating banks. Environmental Assessment Category B. National Bank for 50.0 (R) National Rural Finance - The loan Consultants required for Preparation about to Agriculture (BNA) (Bank) supports: (a) consolidation and training specialists and begin. expansion of rural banking systems institution building. (Co-financing from EIB (credit and savings); (b) development of possible.) institutional capability of BNA and diversification of credit operations Retroactive financing of into private rural non-farm and export up to 10% is planned. promotion activities. Environmental Assessment Category B. Ministeres de 80.0 Rural Roads - The project would Consultants required for Identification under way 1'Equipement at de (Bank) consolidate efforts made under previous technical assistance in l'abitat/ rural roads programs and would the areas of rural Transports/ strengthen arrangements for adequate highway management. Agriculture maintenance. It would also finance road Improvements, road maintenance and maintenance equipment. Environmental Assessment Category B. Ministeres des 80.0 (R) Transport Sector - Project would: Consultants required for Preparation under way. Transports and de (Bank) (a) increase productivity, promote sub-sectoral expertise 1'Equipement/ modernization and rehabilitation in and technical assistance (Possible financing from l'Habitat railways, ports and airportsi and to Ministry of the Global Environment (b) improve road transport organization Transport. Facility (GEF) -- see through deregulation, road safety Annex C.) measures, and road user charge adjustments. Environmental Assessment Cateaory B. Ministry of 75.0 (R) Municipal Sector Investment - Consultants required for Project preparation unde Interior (Bank) Improvement of municipal finance and technical assistance way. Appraisal mission management, and municipal infrastructure component. completed in October investments. Environmental Assessment 1991. Category B. - 100 - Member Country, Amount & Implementing Probable Stage of Processing a Agency ' Lender Project Consulting Services Action on Procurement Treasury 5.0 (R) Technical Assistance for Treasury To be determined. Appraisal mission in (Bank) Data System - Project aims to strengthen field. economic policymaking and management by improving the Treasury's data systems. Environmental Assessment Category C. Ministry of Health 120.0 Health and Family Planning III - Project Consulting services will Second preparation (Bank) will strengthen and decentralize public likely be required for mission is scheduled health services in Central/ implementation. February 1992. Eastern Anatolia. Environmental Assessment Category: To Be Determined. Antalya About (R) Antalya Environment - Project would Consulting services will First preparation mis Municipality 150.0 include water supply, sewerage, solid be required for in the field. (Bank) waste and coastal zone management preparation and components and assist the Antalya execution. Municipality in establishing an appropriate policy and institutional framework for environmental management. Environmental Assessment Category B. To be determined 150.0 (R) Erdemir Environment - To assist To be determined. Project has been remo (Bank) Government in restructuring/privatizing from the Lending Prog state economic enterprises in key Further reporting wil sectors. Environmental Assessment discontinued. Category B. Ministry of 150.0 (R) Basic Education - Project would Consultants likely to be Preparation I mission National Education (Bank) support the expansion of basic schooling required for scheduled for Februar (Grades through 8) to improve system implementation. 1992. coverage and relieve overcrowded schools, with particular effort to raise the school attendance of girls. Environmental Assessment Category C. Cukurova Elektrik 242.3 (R) Berke Hydro Power - Would provide Consultant has been Project pre-appraisal A.S. (CEAS) (Bank) for installation of 510 MW hydro power selected for project completed. Appraisal plan comprising three units of 170 MW preparation design, and mission scheduled for each. Would comprise the construction supervision of the January 1992. of a double curvature, thin arch over project implementation. (Co-financing from IF 201 m height, an headrace tunnel of 2.0 km length and an inside diameter of 9 m, and an underground power plant. Environmental Assessment Category A. To be determined About (R) Coal Pollution Abatement - Pollution Consulting services will Preparation mission 120.0 abating investments for power stations. be required for scheduled for January (Bank) Environmental Assessment Category B. preparation and 1992. implementation. (Co-financing expecte To be determined About (R) Financial Sector Investment - To To be determined. Pre-appraisal missior 150.0 develop capital markets by improving tentatively scheduled (Bank) market efficiency and financial prudence mid-February 1992. and by supporting institutional investors and market facilities. Environmental Assessment Category B. - 101 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender Project Consulting Services Action on Procurement 4 TURKEY (Cont'd) Ministry of About (R) E. Anatolia Watershed Rehabilitation Consultants have been Pre-appraisal mission Agriculture and 100.0 - Improved erosion control, recruited to assist with scheduled for late Rural Affairs, (Bank) reforestation, sustainable dry land preparation. Consultants January 1992, and Ministry of farming and pasture management programs may also be required to appraisal for May 1992. Forestry concentrating on Eastern Turkey; also assist in execution. (Japanese Grant of studies and research. Positive US$326,000 equivalent to environmental impact expected. assist in project Environmental Assessment Category C. preparation.) Ministry of Health About (R) Health II - Creation of a National To be determined. Preparation mission 80.0 Hygiene Institute and support for scheduled for February (Bank) development of a regional network to 1992. public health laboratories. Environmental Assessment Category C. To be determined About (R) Employment and Training - To support Consultants will be Negotiations tentatively 60.0 development of employment-oriented required for execution. scheduled for March 1992. (Bank) training, improvement of labor market information, career guidance counseling, improved employment services occupational standard development, and promotion of women's employment. Environmental Assessment Category C. Bursa Municipality About (R) Bursa Environment - The project will Consultants for Pre-appraisal mission and Buski 100.0 provide sewerage, water supply and solid feasibility study for scheduled for February (Bank) waste management facilities, and will solid waste, and 1992. assist in strengthening policies and feasibility studies for institutions, to control causes of sewerage and water environmental degradation. supply are expected to Environmental Assessment Category B. complete their work in January 1992. Ministry of About (R) Agricultural Research - Civil works, Consulting services will Appraisal report under Agriculture and 100.0 equipment and fellowships to assist in be required to assist preparation. Post Rural Affairs, (Bank) strengthening Turkey's agricultural Government in appraisal mission Ministry of research programs, concentrating on strengthening research scheduled for end January Forestry programs of benefit to the less coordination and 1992. developed regions. Project expected to planning, coordination include research in support of better of overseas training, environmental practices. Environmental and assisting specific Assessment Category C. research programs. Ministry of About (R) Southwest Coast Environment - Consultant has started Preparation mission is in Tourism 150.0 Sewerage and sewage treatment to assist in project the field. (Bank) facilities, water supply facilities, preparation. solid waste facilities, and training and Consultants will also be technical assistance for selected required for subsequent locations along the country's detailed design, southwestern Mediterranean and Aegean construction Coasts. Proiect will bring about major supervision, and other improvements in environment by reducing technical assistance. pollution of sea and shore, and risk of contamination of water supplies. Environmental Assessment Category B. - 102 - Member Country, Amount & Implementing Probable Stage of Processing Agency Lender 2 Project Consulting Services Action on Procureme YEMEN, REPUBLIC OF Ministry of About (R) Basic Education - Likely to include: Consulting services Appraisal mission Education 20.0 (a) access to disadvantaged groups, will be required. scheduled for Januar (IDA) especially girls in rural areas; and 1992. (b) improvement in quality of education (Co-financing will I through teacher training and curriculum, required). textbooks, and achievement test development. Environmental Assessment Category C. Ministry of About National Land and Water Conservation Consultant services will Appraisal report un Agriculture and 26.0 First - Focus on improving efficiency of be required. preparation. Water Resources (IDA) irrigation and forestry sub-sectors. (Co-financing will Environmental effects would be positive required). because of water management, forestry and soil conservation components. Environmental Assessment Category D. Ministry of About Industrial Support Services - Technical Consultants likely to be Appraisal tentativel Economy, Supply 15.0 assistance for industrial planning for required to assist in rescheduled for Jan and Trade, and (IDA) public enterprise reform and for implementation. 1992. Industrial Bank of extension services to small and medium- (Co-financing likel: Yemen scale enterprises, and a line of credit OPEC Fund). for industrial investment. No adverse social or environmental impacts are expected. Environmental Assessment Category B. Yemeni General About Energy/Power - As a result of the Consultants will be Project preparation Electricity 10.3 unification of People's Democratic required to supervise way. Corporation (YGEC) (IDA) Republic of Yemen and Yemen Arab construction. (Co-financing will I Republic, the project content is being required). revised. The current tentative scope consists of urban rehabilitation, line loss reduction and technical assistance components. No negative environmental or social impacts are expected. Environmental Assessment Category B. National Water and About (R) Taiz Water Supply and Sewerage Consulting services for Project preparation Sewerage Authority 30.0 Systems Rehabilitation and Reinforcement feasibility study and way. Pre-appraisal (IDA) (formerly Taiz Water Supply System master plan including mission scheduled f Rehabilitation and Reinforcement) - technical assistance and January/February 19 Rehabilitation and reinforcement of the training. Project Preparation water utility NWSA and water production Facility advance of and distribution facilities and US$1.5 million appr extension of sewerage system to improve to finance: water supply and sewerage services in (a) feasibility stu Taiz. Issues: water resources master plan started management, cost recovery, technical February 1990, expe assistance and training. Environmental to be completed by Assessment Category B. December 19911 (b) resource explorator drilling; and (c) equipment for measurement and lea detection. - 103 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project Consulting Services Action on Procurement 4 YUGOSLAVIA Commune of Split 170.0 (R) Split/Kastela Bay Environment - To be determined. Project has been (Bank) Water supply sewerage and solid waste postponed because of improvements for six communes in the present political . Split/Kastela Bay Region. Includes situation. Further preservation of the Diocletian Palace in reporting will be Split, a major cultural monument and discontinued. tourist attraction. Environmental Assessment Category B. To be determined About (R) Enterprise Rehabilitation - Support To be determined. Project has been 250.0 for rehabilitation and restructuring of postponed because of (Bank) industrial enterprises in several present political subsectors, includes investment and situation. Further technical assistance. Environmental reporting will be Assessment Category B. discontinued. City of Belgrade About Belgrade Environment - Support for To be determined. Preparation under way. -200.0 expansion of water supply system and (Bank) upgrading of sewerage system. Retroactive financing of Environmental Assessment Category B. up to0US$10.0 million is under consideration. Ministry of About Environment--Rijeka - Support for To be determined. Project is ready for Environmental 160.0 improving health and enhancing planned negotiations, but further Protection (Bank) tourism in Rijeka Bay area and Istria processing is on hold. Coastal areas by reducing air and water pollution, improving water supply, Retroactive financing of improving management of solid waste and up to US816.0 million is historic monument preservation. under consideration. Environmental Assessment Category B. To be determined About (R) Small and Medium Enterprise - To be determined. Project has been 150.0 Support for the development of small and postponed because of (Bank) medium enterprises, both public and present political private, including technical assistance, situation. Further Environmental Assessment Category B. reporting will be discontinued. Montenegro Coast About Montenegro Coast Water Supply & To be determined. Preparation on hold Organization for 50.0 Pollution Control - Would provide water pending resolution of Water Supply & (Bank) supply for tourism development and international waterway Sewerage (CPRVK) pollution control facilities for issue. protection of environment. To include water and waste treatment facilities, Retroactive financing of water distribution and sewage collection US$5.0 million to cover networks, and institutional development. civil works is under Environmental Assessment Category B. consideration. To be determined About (R) Financial Sector Adjustment - To Consultants likely to Project has been removed 400.0 support policy measures and be financed by European from the Lending Program. (Bank) restructuring of financial sector. Community. Further reporting will be Environmental Assessment Category C. discontinued. - 104 - Member Country, Amount & Implementing Probable Stage of Processing a Agency ' Lender Project Consulting Services Action on Procurement IV. LATIN AMERICA AND CARIBBEAN REGION ARGENTINA To be determined 300.0 (R) Private Sector Development Cr. - Consulting services will Preparation under way (Bank) Supports private sector investment and be required in Bank financial sector and capital market supervision capital development. Environmental Assessment market development, and Category B. financial and investment policies. Ministry of 250.0 (R) Public Enterprise Reform II Consultants have been Pre-appraisal missiom Defense (Bank) (formerly Public Enterprise identified and are being the field. Restructuring II) - Consolidation of financed by Japanese public enterprise sale and restructuring Grant. programs. Environmental Assessment Category C. Direccion General 16.5 (R) Second Tax Administration - To Consulting services Appraisal mission in Inpositiva (DGI) (Bank) complete the modernization process of will be required for field. the Direccion General Impositiva (DGI), development of software Argentine's main revenue agency. The and management project will cover a four-year consulting development institutional infrastructure development services. on all aspects of DGI. Environmental Assessment Category C. Yacimiento 28.0 (R) Hydrocarbon Engineering - Consulting services will Approved by the Execi Petroliferos (Bank) Preparation of necessary engineering and be required. Directors on Novembei Fiscales (YPF) cost estimates for projects to be 1991. financed under the hydrocarbon sector rehabilitation loan. Environmental Assessment Category B. Ministerio de 300.0 Social Security Reform - Systemic reform To be determined. Preparation under wa Economia (Bank) of pension insurance with the objectives of: (a) making it financially viable; (b) removing labor market distortions and social inequities; and (c) generating long-term savings contributing to capital market development. Environmental Assessment Category C. Ministerio de 150.0 (R) Maternal Child Health and Consultant services will Project preparation Salud y Accion (Bank) Nutrition - Human resource maintenance be required. way. Social through health and nutrition support for vulnerable groups. Environmental Assessment Category C. Yacimientos 200.0 (R) Hydrocarbon Sector Rehabilitation - Consultant services will Project under Petroliferos (Bank) To expand private and public investment be required. identification depen Fiscales (YPF) so as to increase hydrocarbon reserves on outcome of prior and production, improve operational engineering loan. efficiency in refineries for energy conservation and pollution reduction, and upgrade exports. Environmental Assessment Category B. - 105 - Member Country, Amount & Implementing Probable Stage of Processing and Agency I Lender 2 Project Consulting Services Action on Procurement 4 ARGENTINA (Cont'd) Direccion Nacional 200.0 (R) Road Maintenance - Avoidance of: To be determined. Pre-appraisal mission in de Vialidad (Bank) (a) costly road repair and the field. reconstruction; (b) unnecessary increases in vehicle operations cost. Improvement of coordination and cooperation between agencies (national and provincial). Improvement of road activity funding. Environmental Assessment Category B. Ministerio de 100.0 Provincial Health Development - The To be determined. Preparation to be started Salud y Bienestar (Bank) project is still to be defined. Major once agreement is reached Social institutional and policy reform on health sector orientation are envisaged, in strategy. coordination with Bank and IDB. Environmental Assessment: To be determined. Subsecretaria de 300.0 (R) Yacyreta II - Completion of Yacyreta To be determined. Pre-appraisal mission in Energia (Bank) first six units and implementation of the field. the first phase of the associated transmission system. Environmental Procurement: The civil Assessment Category A. works contract for YACYRETA, awarded under a previous loan would likely be financed. BARBADOS To be determined 25.0 SAL - To support the Government's To be determined. Project being identified. '(Bank) medium-term adjustment program, including rationalization of public sector employment, reduction in wages and divestment, trade liberalization and elimination of distortions in the financial sector. Environmental Assessment Category C. To be determined 20.0 Education III - To improve the Ministry To be determined. Project preparation under (Bank) of Education's capacity in planning, Way. policy development and management of the education and training systems. Environmental Assessment Category C. Ministry of Works 18.0 (R) Road Maintenance & Rehabilitation II To be determined. Appraisal mission (Bank) - Financing of a 5-year rehabilitation scheduled for February plan, safety program, technical 1992. assistance and training. Environmental Assessment Category C. - 106 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project 3 Consulting Services Action on Procurement BELIZE Ministry of 8.0 (R) Private Sector Development - To To be determined. Preparation mission in Economic (Bank) provide a line of credit and technical the field. Development, assistance in support of: (a) private Central Bank enterprise investment and development; and (b) policy reforms to enhance the enabling environment for sustained and efficient private sector development, and to make the financial sector more efficient and competitive. Environmental Assessment Category B. Ministry of 7.1 (R) Education and Training - Will To be determined. Approved by the Executi Education (Bank) improve the overall quality and Directors on December efficiency of the education system 1991. through: (a) upgrading physical facilities and equipment; (b) teacher Retroactive financinsa training; and (c) improving curriculum US$1.3 million would bi and other schooling inputs. Rrovided. Environmental Assessment Category C. BOLIVIA To be determined 41.0 (R) Public Enterprise Reform and Private To be determined. Project preparation uni (IDA) Sector Development (formerly Private way. Sector Development) - Term finance for industrial sector via improved apex institutions, support of industrial policy reform, and industrial recovery. Environmental Assessment Category B. To be determined 24.5 Primary Education - To assist in To be determined. Project preparation un (IDA) developing access to primary education way. among the poor. Support the Government's planned reform of the education system and decentralization of public education. Environmental Assessment Category C. Fondo Nacional 4.5 (R) Environmental Technical Assistance - Consultants will be Project preparation un Para el Medio (IDA) Will strengthen key environment-related required for way. Ambiente (FONAMA) institutions; and develop the human environmental legal and resources necessary to plan, evaluate regulatory works and Financing is provided and implement action programs and environmental impact a PPF of US$680,000 am develop an effective legal and assessment. Japanese Grant Facilit regulatory system for environmental of US$314,000. protection and natural resource management. Environmental Assessment (Financing of Category C. US$8.0 million is alsc expected from GEF.) To be determined 35.0 Environment, Industry and Mining - To be determined. Project preparation ur (IDA) Further support for mining sector reform Way. program and development of private sector in an environmentally sound manner. Environmental Assessment Category A. - 107 - Member Country, Amount & Implementing Probable Stage of Processing and Agency' Lender 2 Project I Consulting Services Action on Procurement ' BOLIVIA (Cont'd) Ministry Transport 50.0 Road Maintenance Rehabilitation II - Technical assistance Appraisal report under and Communications (IDA) Maintenance and rehabilitation of the extended for the road preparation. road network, following program worked maintenance financing out applying the maintenance management study. system (SAM) and the equipment management system (SAE). Environmental Assessment Category B. Ministry of 21.0 Technology Development - To improve the Consultants will be Approved by the Executive Agriculture and (IDA) development of agricultural technology required. Invitations Directors on March 14, Campesino Affairs with special emphasis on crop and will be sent out soon 1991. (IBTA) livestock products of present and future for the management of importance for the rural poor. The technical assistance/ project will establish a national training. agricultural research council and strengthen the national research agency (IBTA). Environmental Assessment Category C. Central Bank 40.0 Structural Adjustment - Support of Consultants will be Approved by the Executive (IDA) institutional and policy reforms in required for financial Directors on financial sector, institutional sector issues and September 17, 1991. framework for private investment, privatization. private sector reform/privatization and Retroactive financing of trade promotion. Environmental up to US$7.3 million of Assessment Category C. the proposed credit to finance its general imports (excluding imports of items covered by the negative list) in order to facilitate the implementation of key measures in the adjustment program. Yacimientos 160.0 (R) Power/Gas Pipeline - To increase Consultants will be Appraisal report under Petroliferos (Bank) exports by the sale of electricity to required for preparation. Letter of Fiscales Brazil, burning Bolivia natural gas, and construction, Intent of November 26, Bolivianos (YPFB); to support gas field development. The supervision, and 1991 on the sale of Empresa Nacional project will consist of building a gas- project management. Bolivian natural gas to de Electicidad fired power plant near the Brazilian PETROBRAS (Brazil) has (ENDE) border and its associated gas pipeline led to delay. Resolution from Santa Cruz and providing technical possibly by end February assistance for exploration promotion and 1992. institutional strengthening of YPFB and (JEXIM has confirmed ENDE. Environmental Assessment Category interest in financing A. original project.) Retroactive financing of up to 10% of the loan is being considered. Ministry of 22.5 (R) Agro Export Development Program Consultants will be Board presentation Agriculture (IDA) (AEDP) - Develop agricultural and required. Invitations scheduled for livestock products for export and to bid have been sent December 19, 1991. establish the Bolivia Export Development out (deadline January 3, Foundation (BEF) to manage the project. 1992). Environmental Assessment Category B. - 108 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project Consulting Services Action on Procurement BRAZIL Ministry of Social 75.0 (R) Early Childhood Development - To To be determined. Identification mission Action (Bank) support expansion of access to child scheduled for January care and other child development 1992. programs for children ages 0 to 6 years in low income families. Environmental Assessment Category C. INFRAERO 100.0 INFRAERO Reform - Finance time-slice of To be determined. Project under (Bank) INFRAERO's investment program and preparation. support sectoral regulatory reforms. Environmental Assessment Category: To Be Determined. Ministerio Infra- 200.0 Telecom Reform - Assists with To be determined. Project under Estrutura (Bank) restructuring, modernization and preparation. expansion of telecommunications services. Will also finance a time- slice of sector investment program and address sector-wide policy issues. Environmental Assessment Category: To Be Determined. Companhia Vale Up to (R) CVRD Environment - Supports the To be determined. Appraisal mission do Rio Doce 100.0 environmental program of Compania Vale tentatively scheduled A (Bank) do Rio Doce (CVRD) which includes: February 1992. (a) an industrial pollution control (Possible financing frc component; (b) natural resources the Global Environment component; and (c) a research and Facility (GEF) or othei development component for the donors.) preservation of ecosystems. Environmental Assessment Category: To Be Determined. Departamento 250.0 Federal Highway - Will support Consulting services Project preparation un Nacional de (Bank) decentralization of highway will be required for way. Estradas de administration and private sector engineering and work Rodagem (DNER) involvement in highway construction, supervision, and for operation and maintenance. Would also institutional help finance the federal highway strengthening. rehabilitation and maintenance programs. Environmental Assessment Category B. Ministry of Up to (R) Northeast Basic Education II - Will To be determined. Pre-appraisal mission Education and 150.0 support basic education in five scheduled for January States (Bank) northeast states. Environmental 1992. Assessment Categorv C. (Co-financing of US$1.4 million has beei approved with Japanese Grant Facility.) Secretaria de 75.0 (R) Land Management IV (Mato Grosso do To be determined. Project preparation uni Agricultura, (Bank) Sul) - To improve natural resources way. Pecuaria e protection in Pantanal's watershed and Abastecimento do generate sustainable productivity gains Estado de Mato through improved land management and Grosso do Sul soil conservation in the State of Mato (SECAP-MS) Grosso do Sul. Environmental Assessment Category D. - 109 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project ' Consulting Services Action on Procurement BRAZIL (Cont'd) Ministerio de Up to Transport Sector Reform - Assist To be determined. Preparation under way. Infras-Estrutura 275.0 Government in implementing a package of Secretaria (Bank) regulatory reforms across the transport Nacional dos sector, including a privatization Transportes program, and in financing high priority investments included in the federal transport program. Environmental Assessment Category B. Brazilian Urban Up to (R) Metropolitan Transport - Sao Paulo - Consulting services will Negotiations under way. Rail Company 126.0 The decentralization of the CBTU from be required for (CBTU) (Bank) the federal government to the states of engineering work, Rio de Janeiro and Sao Paulo, to phase supervision and out federal subsidies. Includes institutional substantial institutional and managerial strengthening. reforms. Emphasizes modal integration, and financial policy reform. Environmental Assessment Category B. Ministerio de Acao Up to (R) Water Quality and Pollution To be determined. Appraisal mission Social 300.0 Control - Help sector authorities to tentatively scheduled for (Bank) address water pollution issues through a January 1992. self- sustained investment project in the most congested areas of Brazil, to develop methodologies to tackle the cleaning of environment, and specifically to manage the scarce water sources for human consumption and agriculture. Environmental Assessment Category B. Banco Nacional de Up to Private Sector Power Development - To To be determined. Further processing Desenvolvimento 200.0 finance new private sector investments suspended in light of Economico e Social (Bank) in power through financial macroeconomic situation (BNDES) intermediaries. Environmental and regulatory Assessment Category A. environment. Banco Nacional de Up to Privatization and Capital Market No consulting services Appraisal report under DesenvolvLmento 315.0 Reform - Develop capital markets in required. preparation. Economico e (Bank) coordination with financial sector Sociale (BNDES) strategy and to support preparatory work by Brazil's Privatization Commission and BNDES in the privatization of public enterprises. Environmental Assessment Category B. nMinistry of Health Up to (R) Quality Assurance and Health To be determined. Preparation under way. 125.0 Promotion - Support for strengthening (Bank) government's normative and regulatory roles in health as well as provision of consumer information. Environmental Assessment C. Banco Nacional de Up to National Industrial Pollution Control - To be determined. Appraisal report under Desenvolvimento 50.0 The project consists of a credit to preparation. Economico e (Bank) polluting firms to undertake pollution Sociale (BNDES) abatement investments. Environmental and State Assessment Category D. Environmental Agencies - 110 - Member Country, Amount & Implementing Probable Stage of Processing an Agency Lender 2 Project 3 Consulting Services Action on Procurement BRAZIL (Cont'd) Ministerio de Acao Up to (R) Water Sector Modernization - Finance To be determined. Negotiations scheduled Social 250.0 investments and bring about sector for January 1992. (Bank) policy reforms, improved operations investment planning, and pricing. Environmental Assessment Category B. Mato Grosso State Up to Mato Grosso Natural Resource To be determined. Appraisal report under Secretariat of 150.0 Management - Consolidation of the first preparation. Planning (Bank) phase of North West projects in Mato Grosso, through improvements in the policy framework; intensification of agriculture in areas with sustainable development potential; forest management and conservation; environmental and tribal protection and continued support for small farmer community projects, infrastructure and social service. Environmental Assessment Category D. Petroleo Up to Hydrocarbon Transport and Processing - Consulting services Approved by the Execut Brasileiro S.A. 260.0 Assistance to PETROBRAS to develop: will be required to Directors on June 26, (PETROBRAS) (Bank) (a) high priority product distribution provide PETROBRAS with 1991. facilities: (b) programs to enhance an in-house capability natural gas utilization to reduce for assessing: (a) risk Procurement: Advance product losses and for more efficient in connection with contracting up to energy utilization and environmental operations: (b) air US$60.0 million and control; and (c) technical assistance in quality; and retroactive financing transportation planning, industrial risk (c) pollution. to US$25.0 million of and safety analysis and measures to loan amount would be improve the safety and environmental considered to finance conditions of transportation and urgently needed works. refinery operations. Environmental Assessment Category A. Sao Paulo State Up to (R) Land Management III (Sao Paulo) To be determined. Further preparation Secretariat of 100.0 (formerly Land Management III of Sao pending Government Agriculture and (Bank) Paulo) - To generate environmental authorization. Supply benefits and sustainable productivity gains through improved land management and soil conservation within about 2,000 microcatchments involving 120,000 farmers in Sao Paulo. Environmental Assessment Category D. Centrals Up to (R) Electricity Transmission and Consulting services will Approved by the Execul Electricas 385.0 Conservation - Financing of time slice not be required. Directors on June 14, Brasileiras S.A. (Bank) of power transmission and conservation 1990. Loan signing (ELETROBRAS) investments in selected utilities. postponed. Project expected to finance investments associated with specific power projects and programs of sector utilities. Includes specific provisions for preparing Environmental Impact Statements and corresponding Action Plans as reuired by each individual project and country legislation. Does not present major environmental Problems. Environmental Assessment Category B. - 111 - Member Country, Amount & Implementing Probable Stage of Processing and Agency 1 Lender ' Project ' Consulting Services Action on Procurement' BRAZIL (Cont'd) Ministry of Up to (R) Rondonia Natural Resource Management To be determined. Negotiations scheduled to Interior/Rondonia 167.0 - The project would consolidate the be resumed in mid- State (Bank) first phase of Northwest projects in December 1991. Rondonia, through policy improvements, agricultural intensification in established areas, forest management support, forest extractive activities, environmental and tribal protection, and continued support for small farmer community projects and social services. Environmental Assessment Category D. Ministry of Up to Northeast Basic Education III - The Consulting, services Project preparation to Education 150.0 project will support basic education in expected for management start after Northeast (Bank) up to four states in the Northeast. studies, investment Basic Education II is Environmental Assessment Category C. planning, and project approved. impact evaluation. Ministry of Health Up to Metropolitan Health II - Strengthening To be determined. Project preparation undei 200.0 health services in various metropolitan way. (Bank) areas. Environmental Assessment Category C. Centrals Up to Electric Distribution and Conservation - To be determined. Further processing on Electricas 300.0 Financing of time-slice of power hold pending resolution Brasileiras S.A.. (Bank) distribution and conservation of tariff issue. (ELETROBRAS) investments in selected utilities. Projects expected to finance investments associated with specific power projects and programs of sector utilities. Includes specific provisions for preparing Environmental Impact Statements and corresponding Action Plans as required by each individual proiect and country legislation. Does not present major environmental problems. Environmental Assessment Category C. Departmento de Up to (R) State Highways Management Project - Consultant services will Appraisal under way. Estradas de 200.0 Rehabilitation and periodic maintenance be required for Rodagem (DER) in (Bank) of state highways and strengthening of engineering, Retroactive financing selected states state highway department's maintenance construction supervision would be considered up to capabilities. Includes a component to and technical 10 of the loan amount t strengthen the state highway agencies assistance. help start implementatim environmental capacity. Environmental of project components. Assessment Catexory B. Ministry of Up to Irrigation Subsector II - Private To be determined. Project preparation on Agriculture, 175.0 Irrigation (follow-up to Irrigation hold pending Government'i National (Bank) Subsector I) in Northeast. assignment of priority to Irrigation Environmental Assessment Category B. project. Secretariat - 112 - Member Country, Amount & Implementing Probable Stage of Processing i Agency ' Lender 2 Project' Consulting Services Action on Procurn CARIBBEAN REGION To be determined 9.0 OECS Environment - An OECS regional To be determined. Project preparation i (IDA) project addressing priority way. environmental views derived to serve as a catalyst in attracting interested donors. It could address policy and institutional issues and may include regional as well as national investment. Environmental Assessment Category A. Caribbean. 7.5 OECS Regional Education - Raising the To be determined. Project preparation i Development Bank (Bank)/ standards and efficiency of primary and way. 7.4 secondary education and increasing (IDA) access to post-secondary technical education through cooperation with the. private sector. The project would cover all OECS eligible countries. Environmental Assessment Category C. CHILE Ministerio de 27.0 (R) Technical Assistance and Hospital Consultants services Board presentation Salud (Bank) Rehabilitation - Assistance for will be required for scheduled for preparation of health sector reform project execution. December 17, 1991. studies and financing for emergency small-scale rehabilitation of selected Retroactive financinI hospitals in metropolitan Santiago. up to USS2.7 million Environmental Assessment Category C. being proposed to f1 primarily commenceme select hospital rehabilitation activities. Comision Nacional 20.0 (R) Environmental/Institutional Consulting services will Preparation under va del Medio Ambiente (Bank) Development - Establishment of be required. PPF Advance for environmental institutions and policies, US$250,000 approved and preparation of studies to support finance consultant's future environmental investment services. activities. Environmental Assessment Category C. Ministerio de 71.0 Transport Infrastructure - Consultants have been Board presentation Obras Publicas (Bank) Reconstruction and modernization of hired for environmental scheduled for (MOP) ports and related infrastructure assessment, detailed December 17, 1991. facilities in the fifth and eighth engineering and regions, including inter alia general supervision. Two cargo berths in San Vicente, San Antonio contracts for civil and Valparaiso, and container terminals works: One following in the latter two ports. Environmental international contract Assessment Category B. bidding (ICB), and the second loan contract bidding (LCB) procedure have been awarded. Ministerio de 130.0 Small Farmer Services - Main objectives To be determined. Appraisal report and Agricultura (Bank) would be institutional strengthening; preparation. technical assistance (extension) and complementary credit focussed on small Retroactive financin agricultural producers; and land being proposed. titling. Environmental Assessment Category B. - 113 - Member Country, Amount Implementing Probable Stage of Processing and Agency Lender Project Consulting Services Action on Procurement 4 CHILE (Cont'd) Ministerio de 168.0 Health Sector Reform - Improvement of Consultants are engaged Project preparation unde Salud (Bank) the coverage and the cost-effectiveness in project preparation. way. of basic health services through reforms of key health sector policies, conduct of studies and of innovative programs in select health service areas and rehabilitation of some health facilities. Environmental Assessment Category B. Comision Nacional 65.0 (R) Irrigation Development - To be determined. Pre-appraisal under way de Riego (Bank) Rehabilitation of existing irrigation with Japanese Grant systems, and possible development of new financing. irrigated areas. Environmental Assessment Category A. COLOMBIA To be determined 200.0 Education Sector III - To improve the To be determined. Project being identified (Bank) coverage, quality and cost effectiveness of secondary education. Environmental Assessment Category C. To be determined 300.0 (R) Financial Sector and Capital Market To be determined. Identification mission (Bank) Development - To support sector reforms planned for mid-January to improve the structure efficiency and 1992. competitiveness of the financial system, and to remove the existing constraints to capital markets development. In addition to policy support and technical assistance, loan would include multi- sectoral credit line. Environmental Assessment Category B. Ministry of Health 100.0 Health Services Integration II - To be determined. Project preparation unde (Bank) Decentralization of basic health care way. services and improvement of nutritional status of vulnerable groups. Environmental Assessment Category C. FEN, ISA and 200.0 Energy Sector Fund - To ensure sound Consultants are engaged. Project preparation unde Shareholder (Bank) power investment policies and support Additional services may way. Utilities structural reform of power sector now be required in the being designedl and lending for private future. participation in power and natural gas investment program. Environmental Assessment Category A. Empresa de 182.0 (R) Pollution Abatement and Sanitation - Consultants will be Financial/institutional Acueducto y (Bank) Improve sanitary conditions in the required. action plan and Alcantarillado Bogota river. The project would environmental impact include: major sewerage and drainage studies to be prepared networks; hydraulic regulation of the before appraisal. Bogota river; initial works for abating pollution of the Bogota river; secondary water supply networks; and consultancies and training. Studies to control environmental impact under way. Environmental Assessment Category A. - 114 - Member Country, Amount & Inmalementing Probable Stage of Processing and Agency .ender 2 Project Consulting Services Action an Procurement COLOMBIA (Cont'd) To be determined 200.0 Export Development - Project will To be determined. Preparation under way. (Bank) support the components of the government's economic modernization program focusing on trade facilitation policies, institutional strengthening measures and financing mechanisms to foster Colombia's non-traditional exports. Environmental Assessment Cateaory B. Ministry of 60.0 (R) Agricultural Technology Transfer - To be determined. Preparation mission Agriculture (Bank) To improve agricultural productivity scheduled for and Janus primarily of small-scale farmers through 1992. strengthening of applied research and the system for extension of technology through municipalities in accordance with Colombian decentralization reforms. Environmental Assessment Category C. Ministerio de 266.0 (R) National Highway Sector III. - Consultants will be Negotiations scheduled Obras Publicas y (Bank) Rehabilitation and paving of priority required. for end January 1992. Transporte (MOPT) sections of the national highway network, through financing of a time Retroactive financing. slice of MOPT Investment Program over being considered. 1991-1995. River works to close secondary river channels in a 200- kilometer stretch of the middle Magdalena River. Also, technical studies, training and technical assistance. Environmental Assessment Category B. FINAGRO (FONDO 200.0 (R) Agriculture Credit - Provide a To be determined. Appraisal mission Nacional de (Bank) general line of credit for agriculture scheduled for mid-Janu Credito to FINAGRO for rediscounting through 1992. Agropecuario) commercial banks and other financial institutions. Credit would be made available to large and small farmers for agricultural and agro-processing activities. Would be associated with reforms designed to further improve the efficiency of the financial sector and to reduce subsidies through the financial system. Environmental Assessment Category B. Instituto de 100.0 (R) IFI Restructuring and Divestiture - To be determined. Negotiations tentative Fomento Industrial (Bank) To assist IFI divestiture program and to scheduled for (IFI) support strategic and organizational December 13, 1991. changes in IFI. Line of credit to finance sub-loans for investments by Retroactive financing private productive enterprises. up to USS10.0 million Environmental Assessment Category B. beins proposed. Bogota District 62.0 (R) Bogota Transport - Improve transport Consultants will be Board presentation Government (Bank) conditions in Bogota promote more required for work scheduled for January efficient use of existing supervision and 1992. infrastructure, and strengthen the technical assistance. institutions in charge of planning, Retroactive financing managing and maintaining the city's up to US$6.0 millions transport infrastructure. Environmental be provided. Assessment Category B. - 115 - nember Country, Amount & Implementing Probable Stage of Processing and Agency Lender' Project Consulting Services Action on Procurement 4 COLOMBIA (Cont'd) Banco de la 200.0 Industrial Restructuring - Support for To be determined. Approved by the Executive Republica (Bank) operational/financial restructuring of Directors on May 2, 1991. private sector industries to increase competitiveness in view of import Retroactive financin& for competition form trade reforms and about US$20.0 million is investments expected to require provided. A higher environmental protection in many cases. amount is proposed. Environmental Assessment Category B. COSTA RICA Caja Costarricense 30.0 (R) Health and Nutrition - The project To be determined. First mission for project del Seguro Social (Bank) would support the implementation of the identification/prepara- (CCSS) and Government's state reform program for tion scheduled for Ministry of Health the health/nutrition sectors, focusing February 1992. on: institutional development; strengthening of basic health delivery systems; privatization of services; studies; and operational research. Environmental Assessment Category C. Ministry of 23.0 (R) Education Sector - Improve the Consultants will be Approved by the Executive Education (Bank) quality of basic, primary and secondary required. Directors on November 12, education; and improve sector management 1991. Loan was signed or capacity. Environmental Assessment December 9, 1991. Category C. Retroactive financing of up to USS1.0 million equivalent would be provided to help cover eligible start-up expenditures made on or after July 6. 1991. Ministry of 41.0 (R) Agricultural Sector - Project Consultant will be Board presentation Agriculture; (Bank) activities would; (a) strengthen required. tentatively scheduled fo Agricultural formulation, implementation, and March 1992. Development monitoring of agricultural policies and Institute (IDA); programs; and (b) modernize and National decentralize planning, budgeting, and Production Council administrative functions of key sector (CNP) institutions in support of the Government's goals of increasing productivity, agricultural exports, and cultivation of crops in which Costa Rica has a comparative advantage. A land capability classification component is included, which will improve land planning for sustainable development. Environmental Assessment Category B. Instituto 20.0 (R) Water Supply II - Improvements of Consultants will be Pre-appraisal mission Costarricense de (Bank) water supply and sewerage facilities in required for work tentatively scheduled fo Acueductos y San Jose and surrounding areas and supervision and late February 1992. Alcantarillados institutional strengthening and technical assistance. (AyA) technical assistance to nationwide water company. Environmental Assessment Category B. - 116 - Member Country, Amount & Implementing Probable Stage of Processing Agency I Lender Project' Consulting Services Action on Procuremem COSTA RICA (Cont'd) Ministry of Up to (R) Structural Adjustment III - To To be determined. Appraisal mission Finance 100.0 continue providing assistance to Costa tentatively schedule, (Bank) Rica's structural adjustment and February 1992. economic recovery efforts. Environmental Assessment Category C. DOMINICAN REPUBLIC To be determined 50.0 Private Sector Development - Will To be determined. Project preparation (Bank) support structural reform in the way. financial sector aimed at establishing a transparent and competitive financial structure, as well as reforms in the trade, taxation and foreign investment regimes. Will also provide general line of credit to finance investment requirements by the private sector following market mechanisms for the allocation of credit and establishing the on-lending terms. Environmental Assessment Category C. Secretaria de 15.0 Primary Education - Improve the quality To be determined. Approved by the Exec Educacion, Bellas (Bank) and management of basic primary Directors on June 20 Artes y Cultos education. Environmental Assessment 1991. (SEEBAC) Category C. Retroactive financi up to 8 of the loss being considered. Ministry of Public 80.0 Highway Maintenance V - Financing of a Consultants will be Approved by the Exec Works (Bank) five-year road rehabilitation plan, required. Directors on June 20 equipment, technical assistance and 1991. training. Environmental Assessment Category B. Instituto Nacional 75.0 Irrigated Farming Development - Increase To be determined. Further preparation de Recursos (Bank) agricultural output and productivity way by FAO/CP. Hidraulicos from areas with existing irrigation infrastructure. Proiect will include measures to protect against salinization. Environmental Assessment Category B. Central Bank/Fondo 25.0 Coffee and Export Crops Development - Consultants will be Post appraisal sche4 de Inversiones (Bank) Improvement of production, processing required by bilateral for March 1992. para el Desarrollo and marketing of coffee and development co-financing agency. Economico (FIDE); of non-traditional export crops. Comision Nacional Potential hazards will be mitigated de Cafe, Banco through appropriate proiect design. Agricola Environmental Assessment Category B. - 117 - Xember SCuntry, Amounto Implementing Probable Stage of Processing and Agency ' Leadera Project 3 Consulting Services Action on Procurement 4 ECUADOR Ministry of Public 100.0 (R) Social Development II/Health and Consulting services will Project preparation under Health (Bank) Nutrition - To strengthen primary health be required. way. Project proposal care system and increase impact and submitted to the Bank. efficiency of nutrition programs. PPF advance of Environmental Assessment Category C. US$1,072,000 available to finance consultants' services, office equipment, and pilots to strengthen implementation capacity. Ministerio de 16.0 Mining TA - Support restructuring and Consultants will be Project preparation Energia y Minas (Bank) strengthening of institutional framework required. virtually completed. to foster private sector investment, and improve organization of small scale gold mining including environmental control and social issues. Environmental Assessment Category A. To be determined 10.0 (R) Technical Assistance Environment - Consultants will be Appraisal mission (Bank) Technical assistance for addressing required. tentatively scheduled for institutional framework for February 1992. environmental issues in Ecuador. (Possible financing from Environmental Assessment Category C. the Global Environment Facility (GEF) -- see Annex C.) Ministerio de 89.0 (R) Social Development I/Education and Consulting services will Board presentation Educacion/SECAP (Bank) Training - To strengthen decision-making be required. scheduled for and management of public institutions December 17, 1991. involved in the delivery of basic education and training programs, and Project Preparation improve the quality in the delivery of Facility advance for their programs targeted to the poor. US$640,000 approved to Environmental Assessment Category C. finance consultants' services and office equipment. Corporacion 75.0 (R) Private Sector Development - Consulting services may Negotiations tentatively Financiera (Bank) Financing for medium and large scale be required for scheduled for early Nacional manufacturing and service enterprises, technical assistance. January 1992. Supports policies of trade and financial liberalization. Environmental Assessment Category B. EL SALVADOR Ministry of 30.0 Agriculture Sector Reform and Investment Consultants will be Post appraisal mission Agriculture and (Bank) - Support for the Government's sectoral required. tentatively scheduled for Livestock reform and investment program. January 1992. Environmental Assessment Cateaory B. - 118 - Member Country, Amount & Implementing Probable Stage of Processing i Agency' Lender 2 Project Consulting Services Action on Procuremen GUATEMALA Ministry of 15.0 Social Investment Fund - Loan would To be determined. Negotiations concludi Finance (Bank) support establishment of Social Board presentation Investment Fund to finance very small pending settlement o: social/basic infrastructure and arrears and joint re productive projects in rural areas being of project design vil carried out by Municipalities, community new Government. organizations and non-governmental organizations. Sub-project design and appraisal criteria would address environmental concerns as appropriate. Environmental Assessment Category B. Ministry of Health 25.0 Health/Nutrition Sector - Loan would To be determined. Project preparation (Bank) support government efforts to strengthen has been suspended management of Health Sector, including pending settlement o improved and expanded primary health arrears. care, and nutrition programs. Environmental Assessment Category B. Government and 100.0 (R) Structural Adjustment - This quick- To be determined. Appraisal mission Banco de Guatemala (Bank) disbursing loan would support trade tentatively schedule reform and export development as part of late January 1992. a package of stabilization and sector adjustment measures supported by financial assistance from the Bank. Major components include financing of imported inputs for export products and technical assistance. Environmental Assessment Category C. Ministry of 31.5 Secondary and Regional Road Consultants will be Approved by the Exec Communications, (Bank) Rehabilitation - Strengthening of sector required. Directors on Decembe Transport and planning and road management 1988. Loan signing Public Works rehabilitation of 390 km of gravel postponed pending (MCTOP) secondary earth roads, 180 km of paved settlement of arreaz roads, construction of about 500m of small bridges, equipment, training and Retroactive financir technical assistance. US$1.5 million would iDrovided. GUYANA Ministry of 15.0 Road Rehabilitation - Proposed project To be determined. Preparation under va Communication and (IDA) would consist of: (a) the institutional Works (MCW) strengthening of MCW through technical assistance to the MCW's Central Transport Planning Unit (CTPU) for improving transport planning and project formulation, to the Roads Division (RD) for maintenance management and to the Transport and Harbours Department (THD) for ports management and river transport operations; (b) maintenance of the road network (c) the rehabilitation and minor alignment of selected high priority main roads; (d) rehabilitation and improvement of feeder roads: (e) the rehabilitation and upgrading of river navigation; (f) the expansion of the Georgetown Port; and (g) technical assistance for shipyard rehabilitation. Environmental Assessment Category: To Be Determined. - 119 - Member Country, Amount & Implementing Probable Stage of Processing and Agency' Lender 2 Project Consulting Services Action on Procurement' GUANA (Cont'd) Social Impact 10.1 (R) Health and Nutrition - To help To be determined. Appraisal report under Amelioration (IDA) improve primary health care services and preparation. Programme Agency nutrition standards in the context of (SIMAP) the Government's adjustment program in PPF advance of US$750,000 rural areas. Environmental Assessment approved to finance Category C. preparation. GUYSUCO 25.0 (R) Sugar Industry Rationalization and Government prepared Project preparation under (IDA) Privatization - To expand sugarcane feasibility study being way. production to meet preferential quotas reviewed. and to rationalize, privatize and enhance the efficiency of the sugar industry. Environmental Assessment Category B. HAITI To be determined 15.2 Private Sector Development - To support To be determined. Preparation under way. (IDA) development of private sector industrial firms following an industrial restructuring project. Environmental Assessment Category B. Ministry of 20.1 (R) Economic and Social Fund II - To be determined. Identification under way. Finance/ESF (IDA) Continue to assist Government's efforts to provide: (a) health, nutrition, education, physical infrastructure and employment opportunities; and (b) channel donor financing while strengthening community groups and cooperatives. Environmental Assessment Category: To Be Determined. Ministry of Public 35.0 (R) Road Maintenance & Rehabilitation - Consultants will be Project preparation on Works, Transport (IDA) To improve road maintenance, upgrade key required. hold due to suspension of and Communications road sections and bridges, and all operations. strengthen Ministry of Public Works. Environmental Assessment Category B. Organisme de 28.8 (R) Agricultural Production and Land Selection of consultants Preparation under way and Developpement du (IDA) Development - Increase agricultural/ interested for further being supported by: Nord (ODN) livestock production by making vacant project preparation is (a) a PPF advance of public land available to landless under way. US$183,000i and (b) a yen farmers, supporting irrigation 91.0 million technical development and protecting hilly sectors assistance grant from the in the project area against erosion. Japanese Grant Facility Land protection measures to be (to be signed). Further introduced under proiect. Environmental processing on hold due to Assessment Category B. suspension of all operations. Ministry of 26.1 Forestry and Environmental Protection - Selection of management Approved by the Executive Agriculture, (IDA) To slow the pace of natural resource consultants is under Directors on Natural Resources degradation and establish the way. September 24, 1991. & Rural institutional and policy mechanism for Development Haiti to tackle the problems of A PPF advance of (MARNDR), protection of forests and ecosystems, US$750,000 was approved Directorate of wood production, and of household energy on October 16, 1990. National Resources conservation. Environmental Assessment Category D. - 120 - Member Country, Amount & Implementing Probable Stage of Processing an Agency ' Lender Project 3 Consulting Services Action on Procurement HONDURAS PRAF, Ministry of To be Nutrition/Health - Project would target Consulting services will Project under Health (MOH) Deter- nutritional assistance and improved be required. preparation. mined health services to the rural and urban poor. Project activities would include: rehabilitation and construction of health centers; provision of equipment, materials, medicines, staff, training, etc.: health nutrition, and family planning education; distribution of food coupons to target beneficiaries: rural sanitation works; and technical assistance. Environmental Assessment Category C. Secretaria de To Be (R) Transport Rehabilitation - Project Consulting services Preparation is under w. Comunicaciones y Deter- will assist the Government's efforts to will be required. and pre-appraisal miss Transportes mined support export-led growth through is scheduled for March (SECOPT) rehabilitation of the transport 1992. infrastructure, strengthening of institutional capabilities and increasing the participation of the private sector in the provision of transport services. Environmental Assessment Category: To Be Determined. Ministry of 30.0 (R) Agricultural Sector Adjustment - Consultants will be Appraisal mission Finance/Ministry (IDA) Focus on the structure of sector required. tentatively scheduled of Natural incentives, marketing and price policy, late January 1992. Resources land tenure and forestry issues, and the institutional/organizational strengthen- ing and redeployment of public sector agricultural agencies. Environmental Assessment Category B. JAMAICA Ministry of 45.0 (R) Private Sector - To support private To be determined. Project preparation is Finance, (Bank) sector development through credit under way. Development and availability. Environmental Assessment Planning Category C. To be determined 50.0 (R) Private Sector Development Consultants are being Appraisal mission (Bank) Adjustment (formerly Private Sector identified in the areas scheduled for mid-Jant Development Adjustment I) - Support to of: (a) privatization, 1992. regulatory and institutional reform for (b) regulatory issues; private sector development and the and (c) legal reform. program of privatisation. Environmental Previously engaged Assessment Category C. consultants in the customs reform area will continue. National Water 30.0 (R) Water Supply and Sewerage - To Consultants are Preparation under way. Commission (Bank) control pollution from wastes discharged assisting with the to the Kingston Harbor; and improve initiation of the study. wastewater collection and disposal in the Kingston metropolitan and other tributary areas to the harbor. Environmental Assessment Category: To Be Determined. - 122 - Member Country, Amount & Implementing Probable Stage of Processing an Agency ' Lender I Project 3 Consulting Services Action on Procurement MEKMCO (Cont'd) Banco Nacional de 400.0 (R) Housing Sector - To improve the To be determined. Appraisal mission Obras y Servicios (Bank) operation of the housing market by scheduled for late Publicos increasing the participation of private January 1992. (BANOBRAS) financial intermediaries in providing financing to lower income families, promoting deregulation, and removing distortions in land markets. Environmental Assessment Category B. Secretaria de 150.0 (R) Agricultural Technology - The To be determined. Board presentation Agricultura y (Bank) project will finance civil works, goods, tentatively scheduled Recuros training, and institutional development June 1992. Hidraulicos (SARH) in the public agricultural research and extension system with the objective of Retroactive financing improving its capacity to develop and be sought by the transfer technology. It will also Government for expens support technical assistance to the up to USS10.0 million project executing agencies. incurred before Environmental Assessment Category C. December 31, 1991. Comision Federal 400.0 (R) Power Sector - The proposed project To be determined. Project preparation u de Electricidad (Bank) would finance a time slice of the way. (CFE) Comision Federal de Electricidad's (Possible financing o: investment program in transmission and project component froi distribution, focusing on reduction of the Global Environmen technical losses and control of Facility (GEF) -- see unmetered energy. Environmental Annex C.) Assessment Category B. Fondo de Garantia 300.0 (R) Rural Financial Sector - To improve Consultants will be Appraisal mission y Fomento para la (Bank) the overall efficiency of rural required. tentatively scheduled Agricultura financial markets so that they could February 1992. Ganaderia y better contribute to increasing the Avicultura country's rate of growth. Environmental Retroactive financina Assessment Category B. up to 10% of the loan amount would be requi to finance sub-loans. Departmento de 200.0 (R) Transport Air Quality Management Consultants are Project preparation v Distrito Federal (Bank) (for Mexico City) - Assistance in assisting with the way. (DDF); Secretaria developing a comprehensive program for preparation of a de Desarollo the control of air pollution in the comprehensive program Urbano y Ecologia metropolitan are of Mexico City caused for the control of air (SEDUE) by urban transport. Environmental pollution in Mexico Assessment Category C. City. Banco Nacional de 200.0 Second Urban Transport - Improvement of Consultants are Project preparation i Obras y Servicios (Bank) urban transport systems in medium-size assisting with the way. Publicos cities focussing in particular on preparation of (BANOBRAS) corridors, public transport, road integrated urban Retroactive financin maintenance, traffic management and transport projects in approximately 101 is institutional reforms. Environmental the individual cities. likely to be recommei Assessment Category B. Consultants will be required for technical assistance. - 121 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project 3 Consulting Services Action on Procurement 4 JAMAICA (Cont'd) Planning Institute 35.0 Social Sectors Development II - Project To be determined. Project preparation under of Jamaica (Bank) would provide further support for the way. Government's human resources development program to improve efficiency, equity and quality of social services. Specific investment priorities under this framework would be focused on supporting reform of lower secondary education, improving national education assessment, strengthening health sector maintenance and management, and improving policy analysis and formulation. Environmental Assessment Category C. Jamaica Public 50.0 (R) Finance Sector Deregulation and Consultants will be Appraisal mission is Service Company (Bank) Privatization (formerly Private Sector required for the scheduled for mid-January (JPSC) Energy Development) - Restructuring the establishment of a 1992. energy sector through the establishment framework for PS (Possible cofinancing of a legal, incentive and regulatory participation, the from the Global framework for private sector; and setting up of the fund, Environment Facility establishment of an energy fund to and the privatization (GEF).) facilitate the PS participation; support program. the Government in its privatization program of the energy sector; support the implementation of this program through Technical Assistance of the Government, JPSCO, PCJ and other institutions and agencies. Environmental Assessment Category B. Ministry of 25.0 (R) Small Farmer Development - Support Consultants will be Revised project proposal Agriculture (Bank) Government's program of watershed required. has been submitted and is management and agricultural support awaiting comments from services. Project would focus on major the Government. A environmental issues affecting workshop to discuss agriculture. Environmental Assessment proposals is scheduled Category D. for March 1992. MEWCO Secretariat of 50.0 (R) Mexico Environment - To increase Consulting services will Board presentation Urban-Development (Bank) Government's capacity to implement key be required for scheduled for March 3, and Ecology environmental protection and natural management consulting, 1992. resource management functions and to ecological studies water (Possible financing of a strengthen institutional and policy quality studies, component from the Global framework to enable the Government to ecological standards Environment Facility implement these functions in an developments, and (GEF) -- see Annex C.) efficient and decentralized manner. preparation of protected Environmental Assessment Category D. areas management plans. Sanco Nacional de 400.0 (R) Railway Restructuring - To improve Consulting services Project preparation under Ibras y Servicios (Bank) efficiency through implementation of a will be required. way. lublicos far reaching restructuring plan. BANOBRAS) Project would assist the railways in Retroactive financing of becoming a commercially oriented and up to 10% is likely to be financially viable organization. recommended. Environmental Assessment Category B. - 123 - Member Country, Amount & Implementing Probable Stage of Processing and Agency' Lender Project' Consulting Services Action on Procurement 4 MEXICO (Cont'd) Banco Nacional de 150.0 Highway Rehabilitation and Safety - To To be determined. Project preparation under Obras y Servicios (Bank) consolidate and further strengthen way. Publicos maintenance planning and administration (BANOBRAS) for the federal highway network. Retroactive financins of Environmental Assessment Cateaory C. up to 10% for expenditures made during 1992 would be required. Secretaria de 200.0 Science and Technology - To support Consultants will be Project preparation under Comercio y Fomento (Bank) strengthening the technology-related required. way. Industrial infrastructure support systems, and (SECOFI) and reforming the system for allocating Secretaria de scientific research funds. Programacion y Environmental Assessment Category C. Presupuesto (SPP) Secretaria de 400.0 (R) Irrigation Sector - To provide Consultants will be Approved by the Executive Agricultura y (Bank) support for the government's program to required. Directors on December 3; Recursos strengthen sectoral policies and 1991. Loan was signed on Hidraulicos (SARE) institutions in Mexico's December 6, 1991. irrigation/drainage sector and to finance the sector investment program. Retroactive financing of Environmental Assessment Category B. approximately 10% for expenditures made in 1991 is likely to be recommended. PANAM4A Ministerio de 120.0 (R) Economic Recovery - To support To be determined. Board presentation Planificacion y (Bank) trade, labor and social security reforms tentatively scheduled for Politica Economica as well as improvements in public sector February 18, 1992. management. Environmental Assessment Category C. Retroactive financing of USS60.0 million (first tranche) has been recommended for eligible imports up to 18 months before loan signing. PARAGUAY Ministry of 10.0 (N) Public Enterprise Reform - To The bulk of the project Project preparation under Industry and (Bank) provide technical assistance for cost will be deployed to way. Commerce implementation of the Government's finance consultancy policy for privatization, including the services. establishment of regulatory bodies, financial consultancies for valuation, and investment banking/agency services to implement company sales. Environmental Assessment Category C. Iinisterio de 45.0 Regional Agricultural Development - Will To be determined. Project under kgricultura (Bank) improve farm incomes and assist with the preparation. Appraisal conservation of natural resources with mission tentatively - specific measures to benefit indigenous scheduled for May 15, communities in departments of Alto 1992. Parana and Itapua. Environmental Assessment Catexory A. - 124 - Member Country, Amount & Implementing Probable Stage of Processing an Agency Lender 2 Project 3 Consulting Services Action on Procurement PARAGUAY (Cont'd) National 12.7 (R) Third Rural Water Supply - To Consulting services will SENASA has prepared at Sanitation Service (Bank) improve living conditions of rural be required for 70 sub-projects. (SENASA) population by providing potable water institutional, financial Appraisal mission and sanitation to about 250,000 people. and technical tentatively scheduled Environmental Assessment Category B. assistance. February 15, 1992. Banco Central 50.0 (R) Private Sector Development - Loan to Consultants likely to be Appraisal mission (Bank) channel credit to a wide range of final required. tentatively scheduled borrowers. The loan will also support early January 1992. the liberalization of the financial (Co-financing with IDI sector through strengthening the envisaged). regulatory and supervisory framework, reform of monetary policy tools, establishment of freely determined interest rates, and the strengthening of the Central Bank. Technical assistance will be included to strengthen the Central Bank, primarily the Superintendency of Banks. Environmental Assessment Category B. Ministerio de 29.0 (R) Land Use Rationalization - Project To be determined. Negotiations tentativ4 Agricultura (Bank) will create a complete rural cadastre scheduled for January and geographic information system (GIS), 1992. and will assist in institutional strengthening of Instituto de Bienestar Rural (IBR). Environmental Assessment Category C. Ministerio de 80.0 Road Transport - Road construction Technical assistance for Preparation on hold Obras Publicas y (Bank) improvements and rehabilitation to institutional pending Government's Comunicaciones increase efficiency and capacity in development, detailed approval of a Project (MOPC) transporting agricul-tural exports and engineering, Preparation Facility institutional support for the environmental impact advance to finance reorganization and modernization of MOPC assessments, and staff consulting services. and its highway directorate. training in the use of Environmental Assessment Category B. computer software for engineering applications would be provided during project preparation and implementation. PERU Ministry of 300.0 (R) Financial Sector Reform - To To be determined. Appraisal mission Economy and (Bank) strengthen financial sector policies and scheduled for March 1 Finance institutions, thereby promoting competition and efficiency. Environmental Assessment Category C. Ministry of 300.0 (R) Trade Policy - Adjustment loan to Consulting services Board presentation Economy/Finance (Bank) support government trade reform. will not be required. tentatively scheduled Environmental Assessment Category C. January 14, 1992. Ministry of 300.0 (R) SAL - Reforms in the areas of fiscal Consulting services Appraisal mission in Economy/Finance (Bank) policy, public administration, customs will not be required. field. and tax reform, labor markets, financial sector and agricultural marketing. Environmental Assessment Category C. - 125 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender' Project ' Consulting Services Action on Procurement TRINIDAD & TOBAGO Ministry of 27.0 (R) Business Expansion and Industrial To be determined. Board presentation Planning/Central (Bank) Restructuring (formerly Private Sector scheduled for Bank Development and Industrial December 20, 1991. Restructuring) - To support physical/financial restructuring of private sector industries to increase competitiveness in view of increased import competition from trade reforms and to support expansion of non- traditional exports. Environmental Assessment Category B. URUGUAY To be determined 20.0 (N) Public Administration Reform - Consulting services will Project preparation under (Bank) Reform and modernization of the central be required. way. administration. Environmental Assessment Category C. Gobierno del 65.0 (R) Debt and Debt Service Reduction - Consultant services not Approved by the Executive Uruguay (Bank) Adjustment loan to support debt and debt required. Directors on May 14, service reduction. Environmental 1991. Signing of this Assessment Category C. loan has been delayed because effectiveness is conditioned on completion of the DDSR external financing package, which required Uruguay to make an additional purchase from the IMF under the standby arrangement approved in December 1990. Discussions between Uruguay and the IMF are continuing. Oficina de 20.0 (R) Public Enterprise Reform (formerly Consultants services to Appraisal mission Planeamiento y (Bank) Public Sector) - To support the removal be required. scheduled for March/April Presupuesto of legal monopolies, privatization or 1992. restructuring of key public enterprises (telecom, ports, gas, aviation). Environmental Assessment Category C. To be determined 20.0 (R) Housing - To assist government in To be determined. Project under (Bank) reforming its sector policies, preparation. Project institutional framework and financial scope and type of mechanisms, reducing the current housing operation under review. deficit among low and moderate income groups. Environmental Assessment Category C. - 126 - YMmber Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project 3 Consulting Services Action on Procaureent' VEREZUEA To be determined 150.0 Highway Management - Supports To be determined. Project is under (Bank) institutional reforms aimed at preparation. rationalizing the responsibilities of different levels of Government in the highways sector and would finance time- slicing the investment program for the sector in the 1993-97 period. Environmental Assessment Category B. Consejo Venezolano Up to Urban Transport I - Strengthening of the Consulting services Project preparation und de Transportes 75.0 urban transport sector institutional required in the area of way, with financing frc (Bank) framework, financing mechanisms and traffic management and the technical assistant local coordination. Infrastructure and control, transport loan. traffic management investments in six planning and urban municipalities and the Caracas transport economics. metropolitan region. Environmental Assessment Category B. Ministry of Family Up to (R) Higher Level Manpower Development - To be determined. Appraisal mission 65.0 Will support graduate scholarship in scheduled for February (Bank) specialized fields of study. 1992. Environmental Assessment Category C. Ministries of Up to (R) Venezuela Irrigation To be determined. Preparation under way. Agriculture and 100.0 Rehabilitation - Establishment of an Livestock, (Bank) economically and financially viable Environment and irrigation system policy and support for Renewable privatization and rehabilitation of Resources public irrigation systems. Environmental Assessment Category: To Be Determined. To be determined Up to (R) Power Sector Investment I - Would To be determined. Pre-appraisal mission 200.0 support a program for institutional tentatively scheduled (Bank) technical and financial rehabilitation February 1992. of the power sector, and would consist of: (a) rehabilitation repowering and conversion to gas of thermal power plants; (b) reduction of technical and non-technical losses; (c) construction of transmission lines and sub-stations; and (d) technical assistance and training. Environmental Assessment Category B. Ministry of Health Up to (R) Endemic Disease Control - Would Consulting services will Pre-appraisal mission 50.0 strengthen public endemic disease be required in the area scheduled for March 11 (Bank) control programs and epidemiological of project design. surveillance. Environmental Assessment Category B. - 127 - Mlmber Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project 3 Consulting Services Action on Procurement VENEZUELA (Cont'd) MinisterLo del Up to (R) Caracas Water Rehabilitation and To be determined. Preparation under way. Ambiente y los 100.0 Privatization - Rehabilitation of Recursos Naturales (Bank) existing water supply facilities and Renovables (MARNR) support of the privatization of the Caracas water system operation. Environmental Assessment Category B. To be determined Up to Health - Investment in hospital To be determined. Project being identifiec 100.0 management modernization along with (Bank) policy changes to improve efficiency and equity of health care. Environmental Assessment Category C. Ministry of Up to (R) Agriculture Sector Investment - Will Consultants will be Approved by the Executt; Agriculture 300.0 finance a slice of the 1991-1993 sector required during project Directors on December 3, (Bank) investment program, strengthen the implementation. 1991. sector's institutional framework and ability to evaluate projects and support the Government's reform program in the agricultural sector. Environmental Assessment Category B. Fondo de Credito Up to Private Sector Restructuring and Expatriate and local Project priority under Industrial 80.0 Development - To help increase the consultants will be review. (FONCREI) (Bank) international competitiveness of private required for technical industry by supporting institutional assistance. development of industrial credit system, financing investments of industries, and assisting smooth labor adjustment. Environmental Assessment Category B. Ministry of Family Up to (R) Barrio Upgrading - To counterbalance To be determined. Appraisal mission in thi 42.5 the effect of macroeconomic adjustments field. (Bank) in the Government an the urban poor, the project would finance investments to improve infrastructure and studies in the slum areas of the country's major cities. Environmental Assessment Category B. - 128 - V. NEW PROJECTS ADDED IN THIS ISSUE I. AFRICA REGION COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE BENIN Ministere de L'Industrie Private Sector Development 2 B.P. 363 Cotonou, Benin Fax: 229-30118 Telex: 5252 Telephone: 301646 CAMEROON Ministry of Urban Urban Management 5 and Housing Improvement Telex: 978-8560 Telephone: 11 15 47/ 22 19 93 CAPE VERDE ENAPOR Transport/Infrastructure 7 P.O. Box 82 S. Vicente, Cape Verde Fax: (238) 314661 COTE DIVOIRE Prime Minister's Office, Technical Assistance 10 Ministry of Finance BP V 125, Abidjan, Cote d'Ivoire Telex: 23479 MINIFIN CI Telephone: 32 80 22 DJIBOUTI Ministry of Health Health 11 Boite Postale 1974 Djiboutiville, Djibouti Fax: 253 35 6300 EQUATORIAL GUINEA Ministry of Health Health Improvement 11 Malabo, Equatorial Guinea - 129 - I. AFRICA REGION (Cont'd) COUNTRY AND IMPLEMENTING AGENCY PROJECT PACE LESOTHO Ministry of Transport Infrastructure Maintenance 18 and Works Engineering P.O. Box 413 Maseru, Lesotho Fax: 31 01 88 Telephone: 32 62 91 MALAWI Ministry of Finance Institutional Development II 20 P.O. Box 30049 (ID II) Fax: 734-739 Telex: 44407 Telephone: 731-311 MAURITANIA To be determined Construction Industry 22 Development ZAMBIA To be determined Infrastructure Engineering 36 II. ASIA REGION CHINA Ministry of Machinery and Electronics 43 Electronics Industry SanlLhe, Beijing 100823, PRC China Fax: 868-561 Telephone: 821-8560 China Electronics Corporation 27, Wanshou Road P.O. Box 64 Beijing 100846, PRC China Fax: 821-2233 Telex: 22383 MEI CN Telephone: 821-8560 Ministry of Finance Preinvestment and 43 San Li He Lu Institutional Development Beijing 100820 China Fax: 862361 Telex: 22486 Telephone: 868731 - 130 - II. ASIA REGION Cont'd COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE SRI LANKA Road Development Authority Highway Maintenance 77 Sethsiripaya Sri-Jayawardenapura Kotte Battaramula Sri Lanka Fax: 941-562807 Cable: ROADEV Telex: 22412 ROADEV CE Telephone: 562807 III. EUROPE. MIDDLE EAST AND NORTH AFRICA REGION BULGARIA To be determined Sector Adjustment III 83 Private Sector Development (SAL IIJPSD) CZECHOSLOVAKIA Slovak Power Enterprise Second Power and 84 Haranicna 12, Environmental Improvement 827 36 Bratislava Fax: (42) 7 232-182 Telephone: (42) 7 225-101 MOROCCO To be determined Rural Poverty Reduction 89 IV. LATIN AMERICA AND CARIBBEAN REGION PARAGUAY Ministry of Industry Public Enterprise Reform 123 and Commerce Av. Espanci 323, Asuncion, Paraguay Telephone: (809) 424-833 URUGUAY To be determined Public Administration 125 Reform - 131 - VI. PROJECTS DROPPED FROM LENDING PROGRAM AND PROJECTS SIGNED I. AFRICA REGION COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE BENINITOGO Communaute Electrique du Benin Adjarala Hydroelectric 3 CAMEROON Ministry of Industry and Commerce Private Sector 6 Development Ministry of Planning Structural Adjustment II 6 CHAD Ministry of Public Works Road Maintenance 8 and Transport COTE D'IVOIRE Ministries of Fonction Publique, Economic Management 10 Economie et Finance, et Plan Technical Assistance et Industrie KENYA Ministry of Education Universities 17 Ministry of Health Health Rehabilitation 18 MALI Ministry of Public Works Infrastructure/Transport 22 and Transport Sector NIGERIA Federal Ministry of Science Agricultural Research 28 and Technology TOGO Regie Nationale des Eaux Second Water Supply 33 du Togo/Direction de l'Bydraulique UGANDA Ministry of Finance Structural Adjustment I 34 - 132 - II. ASIA REGION COUNTRY AND IMPLEMENTING AGENCY PROJECT PACE CHINA Ministry of Finance Technical Cooperation III 44 Hainan Electric Power Daguangba-Hainan 50 Company FIJI To be determined Energy Sector 51 INDIA Department of Economic SAL I 53 Affairs, Ministry of Finance INDONESIA Bank of Indonesia/ Emerging Enterprises 61 Participating Financial Development Institutions KOREA Korea Gas Corporation Gas System Expansion/ 65 Natural Gas Utilization PHILIPPINES Central Bank Export Development 73 III. EUROPE, MIDDLE EAST AND NORTH AFRICA REGION CZECHOSLOVAKIA To be determined Financial Sector 85 Adjustment Loan EGYPT, AA REPUBLIC OF Prime Minister's Office Structural Adjustment 87 MOROCCO To be determined Second Public Enterprise 92 Rationalization PAKISTAN Karachi Port Trust (KPT) Karachi Port 95 Modernization - 133 - III. EUROPE, MIDDLE EAST AND NORTH AFRICA REGION (Cont'd) COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE TUNISIA Ministry of Planning and Economic and Financial 98 Regional Development Reform Support YUGOSLAVIA Commune of Split Split/Kastela Bay 103 Environment To be determined Enterprise Rehabilitation 103 To be determined Small and Medium 103 Enterprise To be determined Financial Sector 103 Adjustment IV. LATIN AMERICA AND CARIBBEAN REGION COSTA RICA Ministry of Education Education Sector 115 PEICO Secretaria de Agricultura y Irrigation Sector 123 Recursos Hidraulicos (SARB) , p Í 4 1 I s MONTHLY OPERATIONAL SUMMARY ANNEX I As explained in "Information about the Environmental Assessment Process," environmental classifications for nearly all projects are included in the Main Report every month. This quarterly annex contains: o For Category A projects, operations-specific information about the expected implementation of the environmental assessment process; and 0 For Category B, the status of environmental analysis. p n u 1 t 1. I-1 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : AFR. REGION Project ID No.: 3AFRPA003 Project : Regional Power Sector : Power Managing Division: AF5IE Appr. Date: Jun. 22, 1992 Board Date: Mar. 23, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $400.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: 1. 200 MW hyroelectric plant (5 units of 40 MW each). 2. Over 1,000 km of 225 kV high voltage transmission lines. 3. Installation of transformers and construction of a dispatching Center. 4. Technical Assistance. MAJOR ENVIRONMENTAL ISSUES: Impact of transmission line on land acquisition, human settlements, wildlife, etc. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: Adopt the best route and substation sites from the point of environment. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Funding from the Japanese Grant Facility approved. REMARKS: A few environmental stuides were done a few years ago. 1-2 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : GABON Project ID No.: 3GABPA011 Project : Forestry & Environment Sector : Agriculture & Rural Devt Managing Division: AFlAG Appr. Date: Nov. 15, 1991 Board Date: Aug. 11, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 3rd Quarter,90 Total Project Cost: $30.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS:. (a) institutional strengthening; (b) forestry research; (c) forestry training; (d) inventory and rehabilitation of Okoume stands; (e) studies for environmental protection; and (f) creation and maintenance of reserves. MAJOR ENVIRONMENTAL ISSUES: Most project components are considered to be D/C activities. The project is expected to have a positive environmental impact. An Environmental Impact Assessment is however being done. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: N/A JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The initial classification is a D, however, the new guidelines would reclassify it an A requiring an Environmental Assessment. STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Started in June 1991 with first draft submitted early November 1991. REMARKS: The conservation of forest is a localized issue mainly in areas with 100 km of coast line and around Libreville. Adequate extensive forest management would be sufficient in the rest of the country. Wildlife of the coastal and estuarine areas could be protected through the creation of reserves. Additional reserves on the rest the country would ensure further wildland protection. 1-3 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : GHANA Project ID No.: 3GHAPAO98 Project : Livestock Services Sector : Agriculture & Rural Devt Managing Division: AF4AG Appr. Date: Feb. 28, 1992 Board Date: Sep. 15, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $41.00 Estimated Date for Receipt of EA by Bank: 11/91 MAJOR PROJECT COMPONENTS: (i) Animal health; (ii) Water supply; (iii) Nutrition; and (iv) Breed improvement. MAJOR ENVIRONMENTAL ISSUES: Improved animal health could result in greater pressure on grazing resources, especially around watering points. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: (a) The establishment of herders' associations to regulate use of water and forage resources; (b) introduction of pasture legumes into grazing areas and a range of herbaceous and tree legumes into mixed livestock/crop farming systems to increase availability and improve quality of forage; and (c) the establishment of a range improvement and monitoring unit in the Department of Animal Health and Production to assist herders' associations in regulating water and forage utilization and to improve range productivity. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Environmental impact assessment done as part of project preparation. Little or no adverse impact. REMARKS: 1-4 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : COTE DIVOIRE Project ID No.: 3IVCPA103 Project : Livestock Sector : Agriculture & Rural Devt Managing Division: AF1AG Appr. Date: Oct. 15, 1992 Board Date: Jun. 15, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 2nd Quarter,92 Total Project Cost: $50.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: To be determined. MAJOR ENVIRONMENTAL ISSUES: To be determined. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: To be determined. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Not yet started. REMARKS: 1-5 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : MALAWI Project ID No.: 3MALPAO76 Project : Energy II (Power V) Sector : Power Managing Division: AF6IE Appr. Date: Aug. 23, 1991 Board Date: May 12, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 2nd Quarter,91 Total Project Cost: $231.30 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: Expansion and rehabilitation of generation, transmission and distribution facilities. MAJOR ENVIRONMENTAL ISSUES: (i) Effects of Kapichira hydroelectric dam on downstream fisheries. (ii) Effects of Kapichira dam on upstream wildlife; (iii) Socio-economic effects of Kapichira dam during and after construction; and (iv) Effects of the transmission and distribution components on the environment. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Funding for the Environmental Assessment (EA) has been obtained from Norwegian Sources, and the EA is in progress. Work started in December 1990 with a 2-day workshop in Lilongwe. The EA report is expected in May 1991. REMARKS: The EA has been discussed with Government and ESCOM during the ongoing appraisal mission. The transmission and distribution components have not yet been defined; no major EA activity is anticipated. 1-6 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : MALI Project ID No.: 3MLIPA056 Project : Irrigation Promotion Sector : Agriculture & Rural Devt Managing Division: AF5AG Appr. Date: Jun. 15, 1992 Board Date: Mar. 09, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 2nd Quarter,92 Total Project Cost: $40.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: (i) Promote private irrigation; and (ii) strengthen sectoral institutions and policies. MAJOR ENVIRONMENTAL ISSUES: (i) Water management; and (ii) public health. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Not yet started. REMARKS: Updated EPS issued on 07/17/91 1-7 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : MAURITANIA Project ID No.: 3MTAPA049 Project : Irrigation Promotion Sector : Agriculture & Rural Devt Managing Division: AF5AG Appr. Date: Apr. 01, 1993 Board Date: Dec. 14, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: February 1993 Total Project Cost: $40.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: Development of private irrigation plus selected rehabilitation of publicly constructed schemes. MAJOR ENVIRONMENTAL ISSUES: Not yet identified. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: Not yet identified. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Not yet started. REMARKS: Project preparation scheduled to start in mid-1992. 1-8 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : MAURITIUS Project ID No.: 3MTSPA046 Project : SUGAR ENERGY DEVELOPMENT Sector : Agriculture & Rural Devt Managing Division: AF2AG Appr. Date: Aug. 14, 1991 Board Date: Feb. 11, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $50.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: The project would include the following main components: (a) Expansion of energy production capacity through investment in a new bagasse-cum-coal plant; (b) increasing bagasse availability through a program of mill modernization; (c) investments in bagasse transport; (d) technology development and dissemination; and (e) program monitoring and evaluation, involving technical assistance support. MAJOR ENVIRONMENTAL ISSUES: The proposed investment in a bagasse-cum-coal power plant would result in significant reduction of air pollutant emissions, compared to the investment in an alternative diesel plant. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: Environmental control measures should be introduced involving: (i) installation of a scrubber of spray chamber design; (ii) treatment of ash sluice and scrubber water; (iii) recycling of.bagasse ash as a soil supplement; and (iv) recycling of coal ash possibly as supplement for cement block manufacturing. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Environmental assessment completed. Draft report submitted by consultant for review. REMARKS: 1-9 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : NIGERIA Project ID No.: 3NIRPA105 Project : Multi-State Roads Sector : Transportation Managing Division: AF4IN Appr. Date: Nov. 16, 1991 Board Date: Jun. 23, 1992 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: 4th Quarter,91 Total Project Cost: $225.00 Estimated Date for Receipt of EA by Bank: 06/90 MAJOR PROJECT COMPONENTS: (a) Road rehabilitation and upgrading. (b) Institutional development. MAJOR ENVIRONMENTAL ISSUES: (a) Soil erosion. (b) Handling of chemicals. (c) Revegetation of slopes and right of way. As project involves only improvement of existing roads, no induced development impacts are expected. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: Project will strengthen State road agencies to carry out EAs of road improvement subprojects. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Environmental reconnaisance was carried out in May/June 1990. REMARKS: I-10 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : SENEGAL Project ID No.: 3SENPAO95 Project : URBAN IV Sector : Urbanization Managing Division: AF5IN Appr. Date: JAN. 15, 1993 Board Date: Jul. 13, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $59.00 Estimated Date for 'Receipt of EA by Bank: 11/27/91 MAJOR PROJECT COMPONENTS: Three main components: (a) institutional development on both central and local government levels; (b) physical investments encompassing public infrastracture and facilities; and (c) project management for the recurrent costs. MAJOR ENVIRONMENTAL ISSUES: The situation of environmentally-dangerous living conditions and the low quality of public services, principally of housing, water and sanitation. OTHER ENVIRONMENTAL ISSUES: Industrial hazards and uncontrolled pollution usually in the Cap Vert Peninsula. PROPOSED ACTIONS: Sectoral Environmental Assessment Study (Diagnostic of the Sector). JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The project is an A because a number of similar development activities with potentially cumulative impacts are planned for a variety of specific "city projects". STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The idea of an environmental diagnostic in the urban sector has been submitted to the government. REMARKS: I-11 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : TANZANIA Project ID No.: 3TANPA084 Project : Energy (Power IV) Sector : Power Managing Division: AF61E Appr. Date: JAN. 10, 1992 Board Date: Aug. 11, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 2nd Quarter,91 Total Project Cost: $343.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: (a) Construction of Lower Kihansi Hydro Electric Scheme consisting of 3x54 MW units and associated transmission; (b) rehabilitation of existing facilities (generation and distribution); (c) extension of the distribution network; (d) institutional reforms, including implementation of the second phase of MIS and training; and (e) studies. MAJOR ENVIRONMENTAL ISSUES: Environmental studies completed (Japan). The study reviewed and the Kihansi site visited by the Bank (AFTEN). Evaluation of the woody vegetation near Kihansi with special emphasis on the avifauna is required. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: A terrestrial ecologist is carrying out the survey which is expected to be completed by end of June 1991. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The final environmental assessment report will be prepared based on the study prepared by the Japanese and the outcome of the survey being carried out. REMARKS: No major environmental issues are expected. 1-12 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No.: 4CHAPAO96 Project : ZOUXIAN THERMAL POWER Sector : Power Managing Division: EA2IE Appr. Date: Apr. 19, 1990 Board Date: May 26, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $793.90 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: (i) Construction of 2 X 600 MW coal-fired thermal power units; (ii) construction of one 500-kV and nine 220-kV transmission lines; and (iii) provision of technical assistance for a study to analyze air quality implications of long range thermal power expansion programs and development of practical methodologies for appropriate site selection to minimize adverse air quality in China's coastal provinces. MAJOR ENVIRONMENTAL ISSUES: (1) Air quality: Ground level concentrations of dust particles and sulfur dioxide should be kept within the limits of the national standard (2) Liquid chedical effluent: Plant liquid chemical effluents should be treated prior to discharge. (3) Ash disposal. (4) Water management. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: (1) The project will employ high efficiency electrostatic precipitators for dust removal and burn low sulfur coal. Ground-level concentrations of dust particles and sulfur dioxide would be kept within the limits of the national standard and comply with the World Bank Guidelines. (2) Since the proposed project utilizes cooling towers, there is a minimum water requirement for the plant. Chemical wastewaters will be treated and then utilized for ash sluicing to the disposal area. No chrome chemicals will be used in the cooling towers. (3) Fly ash and ground bottom ash will be slurried and piped to the gullies disposal site about 12-13 km from the plant. The ash surface will be kept wet to prevent dusting and revegetated upon completion. The disposal site is uninhabited. Water should be recycled from ash ponds for reuse in ash slurrying. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Environmental Impact Assessment was completed on May 1990. Bank review indicated that the project would meet World Bank Guidelines and all applicable Chinese environmental norms. REMARKS: 1-13 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No.: 4CHAPAO98 Project : Yanshi Thermal Power Sector : Power Managing Division: EA2IE Appr. Date: Sep. 19, 1988 Board Date: Jan. 14, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $355.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: (i) Construction of 2 x 300 MW coal-fired thermal power units; (ii) construction of 380 km 220-kV transmission lines in parallel with existing routes, with associated substations; and (iii) provision of technical assistance and training. MAJOR ENVIRONMENTAL ISSUES: (i) Dust emissions; (ii) plant liquid chemical effluents; and (iii) ash disposal. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: (1) Project design conforms to the World Bank Guidelines on stack. emission by using a stack height of 240 m and employing high efficiency electrostatic precipitators with an efficiency of 99.7%. (2) Since the proposed project utilizes cooling towers, there is a minimum water requirement for the plant. No chrome chemicals will be used in the cooling towers, only phosphates and chlorine. Plant liquid chemical effluents will be held in a neutralization basin and treated before they are discharged. (3) Ash from the power plant will be disposed in gullies along a mountain range enclosed by dams. The pH and suspended solids values in the ash water will be kept within allowable limits before discharge. (4) An agreement has been reached that the executing agency will establish environmental monitoring system to implement an environmental monitoring program (including monitoring chemical effluents and ash disposal sites) agreed with the Bank. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: A satisfactory EA was completed on August 1988 and was the basis for Bank appraisal and proposed financing. REMARKS: I-14 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No.: 4CHAPA105 Project : Shanghai Port III Sector : Transportation Managing Division: EA2TP Appr. Date: Feb. 01, 1992 Board Date: Nov. 17, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 4th Quarter,91 Total Project Cost: $200.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: - Rehabilitation of existing berths. - Construction of new berths. - Purchase of equipment. MAJOR ENVIRONMENTAL ISSUES: - Disposal of dredged materials in an environmentally-sound manner. - Possible impact on marine environment from new construction. - Disposal of wastes from ships. - Adequacy of land-based supporting infrastructure. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: Environmental issues were discussed with Shanghai Port Authorities. EA will be carried out in accordance with government regulations and mitigating measures will be incorporated into project design. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EA will be available two months before appraisal. REMARKS: 1-15 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No.: 4CHAPA112 Project : Guangdong Provincial Transportation Sector : Transportation Managing Division: EA2TP Appr. Date: Jun. 16, 1992 Board Date: Jan. 19, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 03/92 Total Project Cost: $870.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: To be determined, but could contain: 1. New construction of two Expressway or Class 1 Highway in Guangdong. 2. Highway maintenance/rehabilitation/upgrading. MAJOR ENVIRONMENTAL ISSUES: 1. Severance of land and access by new highway routes. 2. Possible resettlement of population affected by new route. 3. Some shift in vehicle pollution from old routes to new (but overall change could be positive). OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: 1. To include full analysis of above identified and other issues in detailed route alignment studies. 2. To include a resettlement and rehabilitation plan as a project component. 3. To include an environmental management and monitoring plan as a project component, specifying necessary actions and measures. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: An EA is scheduled for completion before appraisal. REMARKS: This form is going to be revised and updated based upon the recent identification mission's findings and understanding with the borrower. 1-16 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No.: 4CHAPA120 Project : Shuikou II Hydroelectric Sector : Power Managing Division: EA2IE Appr. Date: Jun. 24, 1991 Board Date: Jul. 07, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $270.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: (a) Second phase construction of a 101 meter high dam, a spillway, a 1,400 MW power station and a navigation lock; and (b) continuation of resettlement of about 63,000 people. MAJOR ENVIRONMENTAL ISSUES: Resettlement of about 63,000 people; transformation of a riverine environment to a lacustrene environment. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: Programs to implement resettlement and environmental management are currently being executed under the existing plan. These were subject of a mid-term review by a Bank mission in June-July 1991. The mid-term review completed, indicating satisfactory progress. However, the mission was unable to verify from information at hand that 'resettlement' budget will be sufficient to complete program including income restoration. The Bank will therefore require contract for agreed Independent Evaluation of Resettlement (IER) to be in place for negotiations. Assurances will be sought that government will monitor IER, take action in problem areas, and provide funds to maintain incomes of acceptable levels until restored. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Environmental Assessment completed for Shuikou I project. For Shuikou II an updated executive summary of the EA has been received. An updated Environment Management Plan is currently being revised and elaborated to reflect comments of last mission. Completion is expected by end September 1991. REMARKS: 1-17 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No.: 4CHAPA128 Project : Zhejiang Provincial Highway Sector : Transportation Managing Division: EA2TP Appr. Date: Jun. 17, 1991 Board Date: Apr. 21, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $626.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: The project would include: (a) construction of the 138 km long section of the four-lane divided, access controlled Hangzhou-Ningbo Highway (145 km) on new alignment with about 58 km saving in distance over the existing road; (b) construction and improvement of about 40 sections of lower class provincial and country and village roads (1,400 km) in the southwestern region of the Province; (c) consultant services for the construction supervision of the Hangzhou-Ningbo Highway; (d) staff training programs; (e) purchase of equipment for: (i) road laboratories; (ii) road construction and maintenance; (iii) maintenance and operation of the Hangzhou-Ningbo Highway; and (iv) further development and application of the Road Data Bank and Pavement Management System. MAJOR ENVIRONMENTAL ISSUES: An Environmental Impact Assessment for the Hangzhou-Ningbo Highway has been prepared by the Province and mitigating measures for potential adverse effects on the environment have been identified. Environmental protective measures will be taken with respect to erosion control, effect of pollution (air and noise) during construction, effect of earth embankment and borrow pits on land use, water pollution and drainage. Designs would also mitigate air and noise pollution during the operations phase of the highway. The orderly resettlement and appropriate compensation of displaced persons have to be assured. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: (i) An Executive Summary of EA for the Hangzhou-Ningbo Highway, which is under preparation, would be submitted to the EDs by mid-October 1991. (ii) The draft EAP which is expected to be submitted to the Bank by mid-September, would be reviewed by staff and subsequently finalized and agreed with the borrower at negotiations. (iii) The EAP would be reviewed by staff prior to negotiations and agreed with the Borrower at negotiations. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The EA for the Hangzhou-Ningbo Highway component has been completed by the Provincial Environmental Protection Institute and reviewed by Bank's environmental specialist. The Province, based on the Bank's comments, is updating the EA that would be the basis for the preparation of an Environmental Action Plan (EAP) covering the required activities at (i) 1-18 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS pre-construction (design), (ii) construction phase, and (iii) highway operation phase. The draft EAP is being prepared by the Province. The Province is also preparing a Resettlement Action Plan (RAP) in accordance with the understanding reached with Bank staff. REMARKS: Since this is the first highway project in China under which the Bank's EA procedures are being followed, the June/July 1991 appraisal mission discussed with the National Environmental Protection Agency (NEPA) and Environmental Directorate of the Ministry of Communications how the internal procedures and requirements for the environmental assessment of highway projects interact with the Bank's Operational Directive on Environmental Assessment. 1-19 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No.: 4CHAPA156 Project : Xiaolangdi Sector : Agriculture & Rural Devt Managing Division: EA2AG Appr. Date: Sep. 28, 1992 Board Date: Apr. 27, 1993 Lending Instrument: Specific Investment Loan Status:. Lending Date EA Category Assigned: 9/91 Total Project Cost: $2,300.00 Estimated Date for Receipt of EA by Bank: First Qtr 91 MAJOR PROJECT COMPONENTS: (a) Construction of a rockfill dam 171 m high, 1370 m crest length and 56 mcm of fill; (b) construction of a hydropower station with total capacity of 1800 MW; (c) resettlement of 190,000 people in the two provinces of Shanxi and Henan; and (d) construction of additional works for river channel stabilization. MAJOR ENVIRONMENTAL ISSUES: The project will have very significant environmental benefits. It will provide flood protection for about 1.2 million people, increasing the water supply for cities of about 15 million people, reduce sediment deposition in the lower reaches of the river; firm up irrigation for 1 million ha; and generate a portion of the peak power needs of Henan and China's central region. The project will increase the safety of some 100 million people downstream from catastrophic floods. The major environmental issue relates to the resettlement of 190,000 people who live in the reservoir area, over a 15-year period. Dams of this size generally have many other. negative impacts on downstream fisheries, water quality, health, etc. However, unlike other rivers, the Yellow River presently has the highest sil load in the world. With this dam, silt load will be dramatically reduced, low flows will be increased, and water quality improved. The downstream drainage conditions will be improved by less periodic flooding. Hence the health effects downstream will improve and because of less silt and increased low flows, the estuary and river fisheries will be improved quite dramatically. Other environmental impacts of the dam are relatively minor. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: The Yellow River Water and Hydropower Development Corporation (YRWHDC) is completing detailed planning of the resettlement.component for all relocatees below 180m level and undertaking detailed resettlement feasibility studies relocatees between 180m and 275m. YRWHDC and the provinces have now had detailed discussions on sites for settlements and industries to be created for the damsite settlers and for the 180m. Government has been informed that detailed designs up to the 180m level are required by the Bank prior to appraisal and detailed feasibility study level plans are for above 180m level relocatees. The YRWHDC has already spent Y3.0 million to start off preparation of the detail desings for the resettleuent component. YRWHDC has now obtained a further Y20 million to undertake settlements on four sites for 2,000 families (10,000 people) for damsite area resettlement to ensure that all contingencies during resettlement operations are adequately covered. By March 1, 1992, YRWHDC is expected to complete detailed designs for resettlement of 37,000 people up to a reservoir innundation of 180m level 1-20 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS which will. An international resettlement and environmental panel reviewed in June/October 1991 the draft environmental impact assessment (EIA) which was originally prepared by YRWHDC and is now being revised by Canadian Yellow Joint Venture Consortium of consultant (CYJVC). The environmental panel member will review in December 1991 the final EIA report. The preliminary assessment by the panel member is that the project will have some negative impacts in the upstream areas due to rats and some water borne diseases which will be offset by environmental management plans costing Y90 million during the course of the project. But the positive impacts of the project are overwhelming in terms of flood control, irrigation benefits, power production and sediment control benefits. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: YRWHDC has completed an environmental assessment report (fourth edition) which covers in detail all aspects of the project. The reports were reviewed by a Bank mission in October 1991 and in general, there appears to be no major issues. The resettlement has also a detailed report of the activities and has been reviewed in October 1991. The major issue in the resettlement planning has been the ground truthing of detailed planning of YRWHDC with the countries and the agreements to be reached with host area. The Bank mission has indicated to the government that all relocatees for the damsite areas will have to be completed by Jan. 15, 1992 and also by this period, at least 30% of people will have contractual agreements to move into host villages. the CYJVC are now preparing detailed reports on the detailed designs up to 180m level, feasibility studies for all settlement areas 180m to 275m levels and compensation payment requirements. The Government is now allocating considerable funds to ensure that the planning and design work are undertaken adequately. The major issues that still remain are that detail studies at field level require the country's and Provincial Planning Design Institutes to be fully involved in the planning and design process. REMARKS: The Government is very serious about ensuring that the resettlement component is properly executed. They are also very serious about ensuring that all negative impacts as a result of the dam are mitigated. 1-21 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No.: 4CHAPAl71 Project : REGIONAL CEMENT INDUSTRY Sector : Industry Managing Division: EA2IE Appr. Date: May 29, 1989 Board Date: Mar. 17, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $204.20 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: (1) Construction of a modern new 1.2 million tons per year clinker capacity and related cement grinding facilities and a regional river transport and distribution network; (2) rehabilitation of an existing cement plant to expand capacity, enhance production efficiency and meet environmental standards; and (3) strengthening research and design capabilities of four design institutes. MAJOR ENVIRONMENTAL ISSUES: Proper pollution control measures should be taken into account at the design stage for the new facilities; improvements in the facilities to reduce pollution discharges to meet international standards should be a main focus of the rehabilitation component; research and design activities should give a specific emphasis to environmental improvements. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: Incorporate all the measures necessary to meet environmental standards at the design and implementation stages of the project facilities; establish in-house pollution monitoring units for both project entities; mitigation of pollution discharge from small scale cement plants will be a major topic in the research and study program of the institutes. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Environmental impact studies have been carried out and approved by local environmental protection agencies, and were found to be satisfactory by the Bank. REMARKS: The appraisal work for the project has followed up on the above proposed actions, and agreements on proper actions have been reached. Major pollutants in the cement industry in China are small scale plants; a study will be carried out as part of the project to investigate measures to mitigate the nationwide problem. 1-22 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No.: 4CHAPA175 Project : HENAN PROV. TRANSPORT Sector : Transportation Managing Division: EA2TP Appr. Date: Feb. 15, 1992 Board Date: Dec. 15, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 01/92 Total Project Cost: $300.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: The investment component would cover construction of a single-carriage expressway, rehabilitation and improvement of 5 provincial roads (187km), upgrading of 6 rural roads (118 km) and other rural roads that meet agreed criteria. The institutional strengthening and reform component would aim to improve the province's capabilities for investment planning, maintenance and construction; improve the quality of road transport services; introduce road user facilities and establish a system of economically efficient toll roads in the expressway. MAJOR ENVIRONMENTAL ISSUES: An Environmental Impact Assessment for the proposed section of the State Expressway 310 between Kaifeing and Luoyang was completed in June, 1989. Major environmental issues that could be associted with the project include an increase in ambient noise during construction and operation of the expressway, possible flooding during high rainfall episodes, water quality issues related to rain runoff from materials stores, exposed soils, and from the road surface once completed, construction damage to areas with significant cultural, archeological and historical significance, air quality problems related to vehicular emissions, social and public health/safety issues related to cross-road access and pedestrian safety, and resettlement of people and loss of assigned cropland within the road right of way. Transport of construction materials along existing roads may also result in road damage and a temporary increase in traffic problems along roads leading to the expressway. The provincial and rural roads component of the project mainly involves rehabilitation within the existing right of way. Only minor environmental issues are likely when work is limited to existing alignments. These relate to transport of materials, contruction noise, and air/water quality issues related to the use of bitumin during activities directed at sealing the road surface. Where realignment of provincial roads as required, the issues are more varied and similar, but on a smaller scale, to the expressway. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: The EIA has been reviewed and requests made to the Ministry of Communications to clarify and expand upon traffic issues, quarry and borrow pit operation, design and location of cross-road access, and to provide more detailed identification areas within or near the road right of way that have cultural, archeological and historical significance. The MOC has also been asked to prepare and Environmental Action Plan (Management and Monitoring Plans) and a resettlement plan to conform with the Bank's EAOD and involuntary resettlement requirements. The October/November 1991 preappraisal mission 1-23 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS would further review the environmental and resettlement related aspects of the project, the specific issues mentioned above, and the Environmental Action Plan with the involvement of mission environmental and resettlement specialists. The MOC has not prepared an environmental assessment of the rural road component of the project because of the minor nature of possible impacts. The preappraisal mission will review rural road activities, visit representative sites and report on the need to include environmental management provisions in contractor tender documents. The mission will determine if rehabilitation and/or realignment of provincial roads in the project require environment assessment by MOC. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The Environmental Assessment of the Kaifeng to Louyang segment of State Expressway 310 is completed. However, mangement and monitoring plans describing the handling of environmental impacts that were identified in the EIA have yet to be prepared. An Environmental Action Plan should therefore be prepared (draft) before arrival of the preappraisal mission so that it can be reviewed. Likewise, a draft resettlement and compensation (to compensate for loss of dwellings and agricultural land) plan should also be prepared for review by the preappraisal mission. The EIA is also more than 2 years old and may need to be updated as a result of the findings of the preappraisal mission regarding project scope. The updated EIA and final Action and Resettlement Plans must be completed before the project Appraisal Mission can be fielded. REMARKS: 1-24 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No.: 4CHAPA203 Project : Sichuan Gas Development & Conservation Sector : Energy Managing Division: EA2IE Appr. Date: Oct. 09, 1992 Board Date: Jun. 15, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 3rd Quarter,92 Total Project Cost: $700.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: (a) Appraisal and development of new gas fields, rehabilitation of aging fields; (b) upgrading of gas transmission/ distribution systems; (c) product upgrading, energy conservation and pollution control measures at selected fertilizer plants; and (d) TA and training. MAJOR ENVIRONMENTAL ISSUES: The proposed project would have significant environmental benefits: increased gas supply and utilization would reduce coal consumption, which would in turn reduce emissions of S02, C02, and particulates. Nevertheless, various safety and environmental considerations require special attention, including H2S management and treatment, discharge of wastewater from well drillings, gas production and utilization as well as safety concerns in the operation and maintenance of gas pipelines. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: As part of the preparation effort, international consultants will provide technical assistance to the local agency to carry out environmental assessment and to ensure that the project design and implementation will conform to international engineering and safety standards as well as sound environmental practices. Further, various preinvestment studies would be carried out, taking into account the environmental and safety considerations. These studies would cover the rehabilitation of the gas transmission system as well as technological upgrading of small fertilizer plants. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Chinese regulation requires the preparation of an EA report at the time of project design. The identification mission reached agreement with the Chinese authorities that the EA report will be furnished to the Bank for review and comments prior to project appraisal. REMARKS: I-25 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No.: 4CHAPA216 Project : SHANGHAI MTP II Sector : Transportation Managing Division: EA2TP Appr. Date: JAN. 01, 1993 Board Date: Dec. 07, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 10/92 Total Project Cost: $600.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: To be determined. Likely components -- road investments in key corridors, traffic management improvements, institutional development. MAJOR ENVIRONMENTAL ISSUES: To be determined. OTHER ENVIRONMENTAL ISSUES: To be determined. PROPOSED ACTIONS: JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: REMARKS: 1-26 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDIA Project ID No.: 41NDPA323 Project : OIL AND GAS DEVELOPMENT II Sector : Energy Managing Division: AS4EG Appr. Date: Mar. 30, 1992 Board Date: Sep. 29, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $325.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: The primary objective of a Second Oil and Gas Sector Development Loan would be to provide technical and financial support to ONGC for speeding up the development of its oilfields with the help of joint ventures. The second objective would be to assist the Government in the implementation of further reforms in the oil and gas sectors that would give commercial considerations more weight in the decisions taken in these sectors. Since it will take time in order for reforms to result in an increase of domestic oil production, the proposed loan would also contain financial support for crude oil and oil product imports. MAJOR ENVIRONMENTAL ISSUES: Drilling and transport of oil from offshore oilfields poses a number of environmental hazards, including discharge of liquids from platforms, oil spills, solid waste disposal, leakage from oil pipeline, noise and vibration, disruption of marine life during construction. The issues that would need to be addressed further include India's legislation regarding the environment (as far as oil projects are concerned) and ONGC's overall preparedness for environmental disasters. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: ONGC's approach to dealing with these hazards will be assessed in the course of project appraisal. In case remedial action is required, appropriate conditions will be included. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: REMARKS: 1-27 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDIA Project ID No.: 41NDPA420 Project : Baglihar Hydroelectric Sector : Power Managing Division: AS4EG Appr. Date: Jun. 11, 1993 Board Date: Dec. 21, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $950.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: Hydroelectric plant including dam and power houses (450 MW). MAJOR ENVIRONMENTAL ISSUES: Approximately 200 families have to be resettled. There could be an impact from the influx of people for construction. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: Project team will include specialists to identify potentially significant environmental impacts and determine their appropriate treatment. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: An environmentalist and a resettlement specialist will visit the site as soon as possible to determine the potential environmental impact and define the scope of any environmental impact studies. REMARKS: 1-28 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDIA Project ID No.: 4INDPA421 Project : MAHARASHTRA POWER II Sector : Power Managing Division: AS4EG Appr. Date: JAN. 20, 1992 Board Date: May 26, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $1,200.00 Estimated Date for Receipt of EA by Bank: 10/08/91 MAJOR PROJECT COMPONENTS: (i) construction of last stage of Chandrapur thermal power station by the addition of a 500-MW coal fired unit; (ii) extension of Maharashtra's transmission system, including the construction of a + 500 kV HVDC line from Chandrapur to Padghe (about 735 km) and the related terminal stations; (iii) implementation of a load management and loss reduction program and supply of associated equipment; (iv) implementation of an action plan for institutional development and enhanced cost recovery at MSEB; and (v) implementation of a plan for increasing private sector participation in the development and ownership of new power generation and distribution projects in Maharashtra. MAJOR ENVIRONMENTAL ISSUES: CHANDRAPUR 7: (i) emission of sulfurous and nitrous oxides; (ii) liquid effluents from the water treatment plant, the demineralizer plant, the cooling tower and boiler blowdowns and air preheater wash; (iii) although not a consequence of the proposed project, the resettlement and rehabilitation of the 107 families displaced by the construction of units 5 and 6 (under the Chandrapur thermal power project - LN. 2544-IN) has not yet been resolved in a satisfactory manner. HVDC line: about 42 ha of forest area needs to be cleared for the construction of the line and additional land needs to be acquired for tower erection. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: CHANDRAPUR 7: (i) construction of a 200 m high stack at Chandrapur 7 and utilization of a low-sulfur coal are considered sufficient to maintain air quality and SO 2 and NO x emissions within acceptable standards. Environmental clearance for the proposed project has however been given by GOI on the condition that a 275 m high chimney and a flue gas desulfurization (FGD) unit be constructed. Final decision by GOI is still pending; (ii) a waste water treatment plant to dispose of liquid effluents from the existing and new units will be included in the design of the proposed plant; (iii) an R&R plan for the 107 displaced families is under prepartion and will be reviewed by the Bank in the field early November. A plan satisfactory to the Bank is a condition of project appraisal. HDV line: forest clearance from GOI's Department of Environment will need to be obtained before project negotiation. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: 1-29 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The environmental assessment report for Chandrapur 7 is available. An initial environmental examination of the HVDC line has been prepared, but needs to be complemented by an assessment of the impact of forest clearing and land acquisition. REMARKS: 1-30 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDIA Project ID No.: 4INDPA431 Project : Bihar Plateau Sector : Agriculture & Rural Devt Managing Division: AS4AG Appr. Date: Jun. 15, 1992 Board Date: Feb. 09, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 4th Quarter,92 Total Project Cost: $150.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: Resource development - soil and soil-moisture conservation, water use efficiency, agroforestry. Increasing Production - horticulture and grain crops, small livestock. Infrastructure - rural roads, village water supplies, mini-hydro. Women's activities - poultry, pigs, fisheries, lac and artisanal enterprises. MAJOR ENVIRONMENTAL ISSUES: The production component would involve the production of seeds and seedlings, planting by farmers of horticultural and rainfed crops (grains, and agroforestry). These activities would be accompanied by soil and soil-moisture conservation, which should be environmentally positive. Small scale livestock would not generally include grazing. Rural roads would be designed and implemented to minimize adverse environmental impact. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: Many of the resource development components would improve environmental conditions though require appropriate monitoring during implementation. The other project components - fisheries, piggeries and infrastructure development, etc. - will necessitate an appropriately scaled EA with the aim of assessing significant impacts (project - specific and cross-sectoral) and identifying necessary mitigation measures. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Because of the types of components under the project, there is justification for a reclassification of the project to Category B. However, this remains to be confirmed by the preparation mission. STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: An Environmental Reconnaissance for the project will be undertaken by the next preparation mission scheduled to visit the project area November 19. REMARKS: 1-31 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDIA Project ID No.: 4INDPA441 Project : Bombay Sewage Disposal Sector : Water Supply and Sewerage Managing Division: AS4IN Appr. Date: Jun. 15, 1992 Board Date: Feb. 02, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 4th Quarter,91 Total Project Cost: $143.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: Project components will comprise (a) construction of two 3-km marine outfalls to discharge total of 1,560 mld screened but otherwise untreated sewage into Arabian Sea; (b) construction of two aerated lagoons to biologically treat 560 mld sewage prior to discharge into tidal creeks; and (c) technical assistance to supervise construction of sewage disposal works, as well as any other unfinished sewerage system works at the time of project appraisal. MAJOR ENVIRONMENTAL ISSUES: Bacterial levels of near-shore coastal waters would improve, yet would not meet conventional water quality standards. Further environmental assessment is needed to establish likely impact on marine and human life, and to establish the cost effectiveness of the design approach. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: 1. More detailed environmental assessment of present conditions and impact of 3-km outfalls and lagoons is to be performed (Phase I). A mathematical model will be used to estimate environmental effects of different future scenarios of sewage treatment and outfall lengths (Phase II). 2. An environmental monitoring program will be established. 3. Sewer use regulations, monitoring and enforcement would be reviewed toward ensuring that industrial wastes entering the sever system are minimized. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Terms of reference will be drafted for EA to be in two phases; the first of which to be completed prior to project appraisal. REMARKS: At present, liquid wastes are discharged without treatment to urban water courses and drains where they cause enormous ecologic and aesthetic problems, and impose economic costs. This project will help reduce the pollution burden in these heavily populated and industrialized areas. Shore line bacterial standards would not be met but present on-shore and coastal conditions will be substantially improved. 1-32 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDIA Project ID No.: 41NDPA449 Project : Renewable Energy Development Sector : Power Managing Division: AS4EG Appr. Date: Mar. 24, 1992 Board Date: Nov. 24, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 3rd Quarter,91 Total Project Cost: $475.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: The project will involve installation of: (a) small hydroelectric plants on existing irrigation canals and dams; (b) other types of renewable energy systems, e.g., solar, photovoltaic, wind; and (c) expansion of bagasse-based papermill. MAJOR ENVIRONMENTAL ISSUES: Treatment and handling of liquid effluents from papermill will have to be addressed. Air quality may be affected by bagasse dust and chlorine fumes from the plant. Other environmental issues still to be identified. No significant negative environmental issues have been identified for the renewable energy systems to be installed. This component is environmentally positive in that it supports small-scale, non-polluting power systems which will reduce dependence on fossil fuel for energy generation and enhance opportunities for development of local rural communities. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: Bank review of EIA study for bagasse-based papermill expansion. Site reconnaissance by appraisal team. Consultations with affected groups will be made. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EIA study for papermill has been conducted by NEERI and their report has been given to the Bank for comments. REMARKS: No major environmental problems envisaged for mini-hydro schemes since the work is being done on existing canals and dams. The flows will continue to be dictated by irrigation requirements. Comparative water demands will be evaluated carefully to ensure adequate water is available for both irrigation and power, and clearance from irrigation departments will be secured for each site. Construction plans are based on minimizing risk of interference damage to the irrigation system, existing land use and local environment. For windfarm and solar PV systems, impact on land use of each project activity scheme will be assessed. 1-33 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDONESIA Project ID No.: 41NSPA177 Project : Transmigration Second Stage Development (TSSD) Sector : Agriculture & Rural Devt Managing Division: EA3AG Appr. Date: Sep. 22, 1988 Board Date: Jul. 27, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 4th Quarter,90 Total Project Cost: $220.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: The project would increase income through agricultural production in eight existing trans-settlements; strengthen Ministry of Transmigration coordination and implementation capacities for second stage development; and improve overall economic, social and environmental soundness of the transmigration program. MAJOR ENVIRONMENTAL ISSUES: The project involves the continued assistance for annual crops and development of tree crops on cleared and uncleared land in existing settlements. Maintenance of soil fertility and soil conservation are major objectives. Other issues include integrated pest management; resolution of land conflicts; human health and potable water supply; and infrastructural design to minimize any negative environmental impacts. Development of sustainable livelihoods for settlers will produce environmental benefits by helping reduce illegal use of surrounding forest resources. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: A detailed EA report has been prepared to assess measures to solve existing problems and to avoid creation of new problems by the various GOI implementing agencies. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: See "major environmental issues" above. STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: An Environmental Impact Analysis prepared by consultants for the Government of Indonesia, addressing the above proposed actions was completed in November 1989, updated in November 1990, and will be looked at again prior to the departure of the Bank re-appraisal mission. REMARKS: 1-34 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDONESIA Project ID No.: 41NSPA217 Project : JAVA (SURALAYA) THERMAL POWER Sector : Power Managing Division: EA3IE Appr. Date: Jun. 24, 1991 Board Date: May 26, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $1,962.20 Estimated Date for Receipt of EA by Bank: 5/30/90 MAJOR PROJECT COMPONENTS: Expansion of coal fired Suralaya Thermal Power Plant in West Java on an existing site to meet expected growth in demand for electric power. MAJOR ENVIRONMENTAL ISSUES: Environmental issues relate to gaseous emissions (SOx, NOx, particulates), effluents (waste water treatment, leachate), thermal pollution (cooling water), and ash disposal. OTHER ENVIRONMENTAL ISSUES: Drainage and land restoration issues, associated with coal mining. PROPOSED ACTIONS: Environmental assessment report has been prepared by PLN/consultants. Mitigation plans will be incorporated in the plant design and an environmental management plan agreed with the Bank. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EIA report submitted by PLN. Environmental Assessment Summary was circulated to the Board in June 1991 (SecM91-708). REMARKS: 1-35 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDONESIA Project ID No.: 41NSPA299 Project : Surabaya Urban Development II Sector : Urbanization Managing Division: EA3IN Appr. Date: Jun. 15, 1992 Board Date: Mar. 02, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $290.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: Urban roads, water supply distribution, drainage, solid waste disposal, human waste disposal, KIP, and supporting TA services for city of Surabaya. MAJOR ENVIRONMENTAL ISSUES: The project is under preparation. Based on PIL, typical consequences of urban infrastructure projects are expected and are as follows: (i) microdrainage problems due to improper water distribution; (ii) need for resettlement due to road and major drain and water distribution construction; (iii) disposal of polluted drainage and waste water; (iv) proper operation of solid waste collection and disposal site; (v) acceptable sanitation solutions for Kampung improvement (community upgrading) project; and (vi) traffic disruptions during implementation and construction. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: (i) carry out selective drainage improvements in areas receiving increased water distribution; (ii) prepare acceptable resettlement plans and ensure adherence during implementation; (iii) provide suitable treatment facilities prior to final disposal of storm water and sewage flows; (iv) design appropriate system for solid waste operation and provide necessary equipment and training for environmentally acceptable disposal; (v) provide credit, TA and community facilities for improved sanitation (human waste) and (vi) plan and implement a well-thought out construction program and stipulate noise and pollution control measures. For the actions which cannot be completed during project appraisal process, the procedures for implementation would be clearly set out and agreed during negotiations. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Based on the nature of the major environmental issues as summarized above. STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: PIL has been completed. ANDAL is required for roads, drainage and new landfill site. RPLS and RKLS are required for water supply distribution, solid waste and human waste. Draft reports expected during mision in November 1991. REMARKS: The next mission scheduled for Feb. 1992 will provide the information. 1-36 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : KOREA Project ID No.: 4KORPAl20 Project : Seoul Solid Waste Sector : Water Supply and Sewerage Managing Division: EAlIN Appr. Date: Jun. 13, 1991 Board Date: Sep. 01, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $600.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: (a) A sanitary landfill site; (b) Several transfer stations; (c) Associated access road; and (d) Associated vehicles and rolling stock. MAJOR ENVIRONMENTAL ISSUES: OTHER ENVIRONMENTAL ISSUES: (a) Potential air, land and water pollution and aesthetic nuisances at the disposal site; (b) Change in utilization of land at disposal site; (c) Transportation of solid waste from transfer stations to disposal site; (d) change in land use and in air and noise pollution impacts as a consequence of transport investments; and (e) closure and maintenance of existing dump site. PROPOSED ACTIONS: Environmental Impact Assessments have been completed for the land fill site, the access road and the transfer stations. They have been reviewed by Bank missions and found satisfactory. Mitigate measures assessed as necessary in the EIAs have been addressed in designs. The Bank has also reviewed SMG's Terms of Reference for a feasibility study to close the existing dump and advised SMG on the emphasis of the study. SMG has explained procedures for addressing the situation of scavengers as the existing dump is closed and the Bank has requested additional information. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Risk of river and sea pollution. STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: As discussed above, the Bank has reviewed the three EIAs undertaken for the various components of this project and found them satisfactory. REMARKS: Advice has just been received from SMG thay they wish to restructure the proposed project. Details of the proposed changes have been requested. Following receipt, an assessment will be made as to whether the proposed changes can be supported and whether the change would require a new environmental assessment. 1-37. ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : MALAYSIA Project ID No.: 4MAYPA089 Project : POWER SYSTEM DEVELOPMENT Sector : Power Managing Division: EAlIE Appr. Date: JAN. 06, 1991 Board Date: Jan. 21, 1992 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Completed Total Project Cost: $3,200.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: The proposed loan will finance the following components from the Tenaga Nasional Berhad's (TNB's) investments: (a) 1 x 300 MW gas-fuelled combined-cycle power block at the existing 900 MW Paka power station; (b) 230 km long, 275 kV Kampung Awah-Yong Peng transmission line; and (c) 275-132 kV system expansion for power supply in Kuala Lumpur. MAJOR ENVIRONMENTAL ISSUES: As the combined-cycle power plant associated with the project will normally burn natural gas which is relatively a clean fuel, atmospheric pollution problems are not expected to be serious; the predominant pollution will be due to NOX emissions. The combined-cycle plant will need consideration of noise problems. Major high voltage lines may involve problems of resettlement, deforestation, impingement on wet-lands etc. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: For the combined-cycle power plant, NOX emission limits will be specified and suitable chimneys provided to achieve acceptable ambient levels. Noise emissions from gas turbines will be controlled by providing suitable enclosures and other safety features to limit noise exposure of personnel to prescribed levels. Thermal pollution effects will be controlled by limiting temperature rise of cooling water and ensuring proper dispersion (based on model studies). Levels of chemical pollutants in the effluents will be controlled by appropriate means. EAs will be prepared for the major transmission routes surveys and where necessary lines may be diverted over critical portions of the route. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The EIA for the Paka combined-cycle power station has been completed and approved by the Department of Environment (DOE). DOE has stipulated certain conditions to be complied with and TNB will take necessary action in the matter. EIA for the 275 kV Kampung-Awah-Yong Peng transmission line has been completed by Asia Wetland Bureau and their report is under study. The system expansion for power supply in Kuala Lumpur does not pose any significant environmental impacts. 1-38 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS EIAs of other power generation projects in TNB's development program (which will not be financed by the Bank) are either complete or in an advanced stage of preparation. Bank missions have commented on some of these EIAs and have secured assurances that the projects would be undertaken by TNB only after EIAs have been approved by the DOE and DOE's stipulations complied with. REMARKS: Appraisal of the project has been completed. 1-39 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : MALAYSIA Project ID No.: 4MAYPA107 Project : Drainage & Flood Mitigation Sector : Agriculture & Rural Devt Managing Division: EA1AG Appr. Date: Oct. 01, 1992 Board Date: Aug. 03, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $90.00 Estimated Date for Receipt of EA by Bank: 11/13/91 MAJOR PROJECT COMPONENTS: Drainage and flood alleviation works and related agricultural development in some 5-8 schemes through Malaysia. The project also includes a pilot scheme for the reclamation of tin mine areas in the state of Perak. MAJOR ENVIRONMENTAL ISSUES: As required by Malaysian law, EIAs have been completed for the two most critical schemes (Tumboh Block and Briah). The EIA reports identified likely adverse impacts regarding the use of agro-chemicals, land reclamation and loss or endangerment of biological resources. The reports make specific recommendations including conservation of some critical areas deemed necessary to maintain a continuum of wetland, reverine dry land and forest development. Other schemes are not expected to pose major problems. The tin mine reclamation pilot scheme is expected to bring aobut positive environmental results. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: The Government has been requested to supplement the EIAs with specific environmental management plans to implement the proposed mitigation measures. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: This project is categorized as an A in view of the potential adverse impacts derived from the Tumboh and Briah schemes. STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: GOM requires the preparation of EIAs for all agricultural projects. EIAs have been completed for two subprojects. Other assessments are in preparation and are expected to be completed in mid-1992. REMARKS: 1-40 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : MALAYSIA Project ID No.: 4MAYPA110 Project : Sarawak Roads Sector : Transportation Managing Division: EAlIN Appr. Date: Oct. 01, 1992 Board Date: Jun. 01, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: June 1992 Total Project Cost: $50.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: Road Rehabilitation and Construction (Specific project content not yet determined). No IEPS as yet. MAJOR ENVIRONMENTAL ISSUES: TBD OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: TBD JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: TBD REMARKS: Project not yet included in Government's 6th Development Plan. 1-41 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : NEPAL Project ID No.: 4NEPPA076 Project : POWER GENERATION (ARUN) Sector : Power Managing Division: ASlIE Appr. Date: Feb. 01, 1992 Board Date: Sep. 15, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 3rd Quarter,91 Total Project Cost: $950.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: Headworks including 65m high dam; headrace tunnel (11.4 kms long); underground powerhouse for up to 402 MW of generating equipment, switchyard; 220 kV power evacuation facilities (including substations and transmission lines); 192 km access road (financed under Cr. 2029-NEP). Access Road under implementation by the Department of Roads (DOR); Hydroelectric project to be implemented by the Nepal Electricity Authority (NEA). MAJOR ENVIRONMENTAL ISSUES: (a) Construction of access road could scar countryside through cutting and filling until vegetation is restored; (b) deforestation due to need to support workforce as well as possible illegal cutting/export of standing forest; (c) nutrition/general health of the construction workforce; (d) acquisition of land along access road right of way; (e) preparation of an environmental assessment (EA) of the hydroelectric project; (f) acquisition of land to implement hydroelectric project; (g) conservation of forest, scarce/valuable plants; wildlife and watershed upstream of the dam; (h) control tourism/trekking in the Arun Valley; and (i) institutional weakness of NEA for addressing hydroelectric project environmental issues. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: (a) To ensure load stability, road alignment should follow ridges as closely as possible; (b) to address issues (b)-(c) above, the access road tender documents require: (i) bidders to supply information on size of workforce to be employed as well as location/layout of workcamps; (ii) fuel (petroleum/fuelwood) to be used by contractors from legal sources; (iii) supply of goods to work-force through fair price shops erected by the contractors as provision of free medical facilities; (iv) control gates on to be manned 24 hrs/day by the contractors to monitor illegal movement of timber; and (v) implementation by the Ministry of Forests and Soil Conservation of an action plan, agreed with IDA to control illegal logging; and (c) development/implementation of a land acquisition, compensation and resettlement plan (ACRP) for road ROW; (d) preparation of an environmental assessment of the hydroelectric project; (e) development/implementation of an ACRP for land to be acquired under the hydroelectric project; (f) development of a management plan for the watershed upstream from the dam; (g) development of a management plan for tourism/trekking in the Arun 1-42 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Valley; and (h) institutionalization of an environmental management unit (EMU) within NEA to address, inter alia, environmental issues related to the hydroelectric project. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Action plan for addressing issues (a) - (d) to be implemented in conjunction with Cr. 2029-NEP; consultants have been selected and work has begun to develop an action plan to address remaining issues. REMARKS: The initial EPS meeting took place before the Bank's environmental guidelines were issued; the program of proposed actions follows the spirit of the Bank's environmental requirements as closely as possible. The King Mahendra Trust for Nature Conservation - Nepal's leading environmental NGO has been contracted to develop management plans for (a) the watershed upstream from the dam and (b) tourism/trekking in the Arun Valley. 1-43 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : PAPUA NEW G. Project ID No.: 4PAPPA045 Project : Forestry Sector : Agriculture & Rural Devt Managing Division: EA3AG Appr. Date: Jul. 14, 1992 Board Date: Jul. 13, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 04/92 Total Project Cost: $20.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: To be determined, but might include some of the following: 1. Human resources development for forestry sector; 2. Implementation of task forces for managing forests and monitoring logging programs; 3. Forest resource management; 4. Strengthening capability of state market surveilance organization; and 5. World Heritage forestry conservation component. MAJOR ENVIRONMENTAL ISSUES: The forests of PNG are rich in biodiversity. The integrity and sustainability of forest cover is under threat from two sources: forest management capacity in PNG is inadequate to allow effective monitoring and control of forest operations; and current legislation and policies do not encourage effective involvement of landholders in management of their resource. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: A major focus of the project will be improvement in the environmental management of the resource. The project will aim to implement systems for sustainable forest management with built-in environmental monitoring and control. It will also assist PNG in assessing the scope and nature of the forest resource, and in training PNG nationals in all aspects of forest and environmental management. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: There will be continued logging operations in the tropical moist forest, and project will be involved in controlled monitoring of these operations. STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EA preparation tentatively scheduled for Feb. 1992. REMARKS: 1-44 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : PHILIPPINES Project ID No.: 4PHLPA179 Project : Leyte Geothermal Energy Sector : Power Managing Division: EAlIE Appr. Date: Mar. 31, 1992 Board Date: Dec. 01, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: October 1991 Total Project Cost: $1,212.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: The proposed loan will partly finance the development of the geothermal field at Leyte (A), the construction of a power generation plant (8*55 MW) and the implementation of 473 km transmission to Luzon with a 23 km subsea part. The Bank will review the environmental reports from the two entities, before negotiation, to show that there is compliance with the regulations and standards of the Environmental Management Bureau (EMB) of the Philippines, in the design, and these are satisfactory to the Bank. MAJOR ENVIRONMENTAL ISSUES: Discharge of geothermal fluids into local streams has to be controlled carefully so that stream arsenic and boron content are within safe limits. In the operational phase, the fluids will be reinjected into the deep reservoir. Hydrogen sulfide and other non-condensible gases from the power station will be evacuated through high stacks and at the same time ground concentrations in plant areas will be monitored and alarm systems installed. Noise levels could occasionally be high when steam is vented for pressure stabilization, but staff will be protected by being inside air conditioned control rooms. Staff housing colonies will be located far from the development. The geothermal sites are in remote areas away from habitations. Some relocation of people along the transmission line corridor is likely. NPC will take adequate measures to resettlement and compensation of these affected. Leyte development will open new areas of forested parts of the Togonan Reservation. PNOC will adopt necessary forest protection strategies in cooperation with other agencies of the government such as DENR and the armed services as well as non-government organizations and groups involved in environmental safeguards. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: NPC and PNOC are preparing EAs for scrutiny by EMB and will obtain environment clearance certificates for the different components of the project. Some certificates have been obtained, following which only PNOC could drill wells in some of the sectors of Leyte A. PNOC and NPC have experience in the preparation of EAs. For power transmission, EAs have to be done after route surveys. Bank will monitor the progress in the obtaining of the certificates from time to time. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Draft EA's for construction and operation of Leyte A steamfield and 1-45 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS power station have been submitted to the bank for review. REMARKS: The Energy Sector Loan (Loan No. 3165-PH) had addressed the strengthening of EMB and upgrading of its quality through technical assistance, training, acquisition of sophisticated tools and instruments and adoption of standards, practices and procedures from other countries as would be useful and relevant to the Philippines. Bank staff have also reviewed EMB guidelines, for example EIS Scoping Guidelines for geothermal projects and have made suggestions. 1-46 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : THAILAND Project ID No.: 4THLPA102 Project : Power System Development III Sector : Industry Managing Division: EAIIE Appr. Date: Oct. 01, 1990 Board Date: Dec. 10, 1991 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $2,933.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: The proposed loan will finance the FY91-92 time-slice of EGAT's investments in generation, transmission and mine expansion. Currently, Bank funds are proposed to be utilized for the following major components: (a) civil works of the Pak Mun hydroelectric project; and (b) equipments for the expansion of the Mae Moh lignite mines for units 8 and 9, Stage II. MAJOR ENVIRONMENTAL ISSUES: The Pak Mun hydroelectric project has the following environmental impacts: (a) possible health risk of waterborne disease (schistosomiasis); (b) displacement of about 250 families; (c) submergence of Kaeng Saphu rapids which are a tourist attraction; (d) impact on riverain fisheries; and (e) loss of about 1.1 quare km of Kaeng Tana National Park. The Stage II expansion of the Mae Moh mines involves construction of additional coal handling/conveying facilities within the existing mining complex hence its incremental environmental impacts are expected to be limited to increase in dust levels and waste water discharges, without involving loss of vegetation or resettlement of persons. The associated expansion of power generation units (not financed by the Bank) will, however, lead to increased levels of atmospheric pollution due to S02, dust and other coal combusion products. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: For the Pak Mun hydroelectric project the following environmental impact mitigation plan (EIMP) has been proposed by the government: (i) modification of project operating regime to protect the rapids and tourist industry during the January-May dry season by annually holding reservoir level to about 106 m and allowing it to fill to 108 m only in the rainy season; (ii) resettlement program to provide replacement housesites, farmlands, infrastructure and supplementary income generating programs to the affected population to be implemented by the provincial Resettlement and Compensation Committees; (iii) budgetary allocation from EGAT to Royal Forestry Department to strengthen protection measures of the Kaeng Tana National Park; (iv) fisheries development program in reservoir, including fish research station, fish stocking and monitoring of reservoir ecology and construction of a fish ladder; (v) study of endemic diseases and public health risks and institution of a health monitoring program; (vi) replacement of about 1 km of highway; (vii) archaeological salvage as necessary; and (viii) environmental monitoring and EIMP evaluation. 1-47 ENVIRONMENTAL DATA SHEET.FOR CATEGORY "A" PROJECTS In addition, EGAT has been asked by the Bank to prepare detailed action plans for each EIMP component, as for example a Resettlement Action Plan, a Fisheries Development Action Plan, and so forth, by the relevant line agency which will be responsible for their implementation in cooperation with EGAT. For additional power units 12 and 12 at Mae Moh, EGAT will install wet scrubbers to reduce 802 pollution levels. EGAT will also undertake studies on Acid Raid and mountain ecology. Increased dust levels due to mine operations would be handled by water spraying and waste water discharges by treatment and other suitable measures. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: For the Pak Mun hydroelectric project an EA has been prepared by consultants and following this, mitigation measures have been approved by the government. Survey of flooded lands has been completed. Resettlement and compensation activities are in progress. Actions of environmental impact mitigation and resettlement/compensation have been agreed with the Bank. For the Mae Moh mine expansion for units 8 and 9 Stage I, (not under this project) resettlement of persons is currently being implemented and this was found to be progressing satisfactorily by a Bank mission in July 1990. The EAS for Mae Moh mine and associated power plan expansions have been prepared by EGAT, and environmental action agreed with the Bank. REMARKS: 1-48 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : THAILAND Project ID No.: 4THLPA118 Project : GAS TRANSMISSION Sector : Energy Managing Division: EAlIE Appr. Date: Dec. 09, 1991 Board Date: Sep. 08, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: October 1991 Total Project Cost: $397.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: The project consists of (a) 32" diameter, 175 km long; and 24" diameter, 160 km long submarine pipeline for transmission of natural gas to onshore facilities; and (b) expansion of Supervisory Control and Data Acquisition (SCADA) System. MAJOR ENVIRONMENTAL ISSUES: Pipelines under this project will carry non-associated gas and therefore, have much lesser degree of environmental risk than would be the case with oil or associated gas. The potential environmental issues are (a) disruption of marine life which may be caused by the changes in the seabed conditions in the vicinity of the pipes during the pipe laying period; (b) discharge of liquids (produced water, sewage and drainage) from production platforms; (c) noise and vibration caused by equipment on the production platform; (d) leakage of methane from the pipeline; (e) disposal of mercury present in the gas; (f) lack of safety and environmental standards in PTT; and (g) lack of environmental regulations, by DMR, for offshore exploration and production. PTT's operational safety record is excellent. The site of production is about 200 km from any onshore location. Pipeline construction will conform to international standards of safety. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: Set-up a mitigation plan that will include among others: (a) correction of adverse effect during construction; (b) develop safety and environmental standards for PTT and DMR; and (c) correct-the EA prior to appraisal mission. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The EIA report has been prepared by Team Consulting Co., on behalf of Bechtel/Lavalin, who are the primary consultants to PTT. Prior to the preparation of the EIA, the pre-appraisal mission discussed the terms of reference with PTT and the consultants, and it was agreed that additional points raised by the Bank would be included in the study. The Consultants have completed the EIA and submitted it to the Bank for comments. The Bank's comments have been conveyed to the Borrower and the consultants, and will be included in the preparation of the final report. REMARKS: 1-49 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : THAILAND Project ID No.: 4THLPA145 Project : INDUSTRIAL POLLUTION CONTROL Sector : Industry Managing Division: EAlIE Appr. Date: Dec. 01, 1992 Board Date: Aug. 03, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $90.00 Estimated Date for Receipt of EA by Bank: 4/92 MAJOR PROJECT COMPONENTS: The proposed project would have four components: (i) construction of central industrial waste treatment facilities for areas with high concentration of chemical and related industries, including Suksawat and Rangsit; (ii) completion of final engineering and construction of another two treatment systems to be selected among the prefeasbility studies being prepared for Poochao, Samingprai, Teparak, Krathumban and Sampran; (iii) construction of collection, treatment and disposal systems for toxic/hazardous waste at Chonburi and Rachaburi, (iv) funding of waste reduction and pollution abatement schemes for individual industries; (v) training in industrial pollution and environmental management; and (vi) technical assistance to review the institutional management and financial framework of the sector, including the purchase of monitoring and sampling equipment. MAJOR ENVIRONMENTAL ISSUES: The project would reduce significant industrial pollution, which is a serious and rapidly growing problem in the project areas. However, unless some concessional financing is provided by foreign donors, the project approval, its implementation and its benefits may suffer considerable delays. Additional issues include: (a) adequate legal and institutional framework; (b) adequate system for cost recovery, at least for operation; (c) project design to avoid or reduce environmental damage; and (d) the inclusion of the transhipment of toxic waste in the port of Bangkok (which is a contentious issue), is also important, but its priority and the preparation of engineering studies is to be discussed with Government. OTHER ENVIRONMENTAL ISSUES: PROPOSED.ACTIONS: Consultants are being hired to prepare the feasibility and final engineering for the project. After basi design is established an EA will be completed. Any environmental problems identified will be incorporated in the final design. Other actions regarding issues already identified include: (a) To ensure that the legal and institutional framework is adequate, a DANIDA grant of $700,000 will finance studies and technical assistance to DIW and the NEB. These studies will be completed by mid-1992, and their key recommendations 1-50 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS will be included in the project; (b) Adequate cost recovery for operation and part of the capital expenditures is needed to ensure the project sustainability. For this purpose the above-mentioned study will provide recommendations, which are expected to be similar to the ongoing pollution charges implemented for the 11 Industrial Estates, where pollution fees are based on the BOD and volume of waste. (c) The location of the treatment facilities, the type of treatment, the odor and atmospheric emission, the final sludge disposal, etc. will require attention during the engineering studies to prevent or mitigate potential environmental damage. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The contracts for the,final feasibility and subsequent final design are expected to be signed in November 1991 (being financed by a Japanese Grant). The consultants will prepare an EA for review by the Bank and DIW at the completion of the final feasibility stage (by April 1992), and before the initiation of the final design (expected by September 1992). REMARKS: Bank preparation missions, and the support of an environmental professional in the Resident Mission would supervise the project preparation and the consultants' study. 1-51 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CZECHOS. Project ID No.: 5CZKPA011 Project : ENVIRONMENT I Sector : Energy Managing Division: EM4EE Appr. Date: Jun. 08, 1992 Board Date: Nov. 30, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: June 1992 Total Project Cost: $150.00 Estimated Date for Receipt of EA by Bank: March 1991 MAJOR PROJECT COMPONENTS: 1. Municipal services (water, sewerage and solid waste) in 8 cities. 2. Hazardous waste incineration in two locations. 3. Mining reclamation program. 4. Activities to implement environmental master plans in Northern Bohemia and Northern Moravia. 5. Institutional strengthening and technical assistance, including feasibility studies for next project. MAJOR ENVIRONMENTAL ISSUES: Siting and design of hazardous waste disposal (incineration) facilities. OTHER ENVIRONMENTAL ISSUES: Design of municipal wastewater treatment plants to meet receiving water standards. PROPOSED ACTIONS: Hazardous waste component will require full EA prior to appraisal. Wastewater treatment plants (and possibly other investments under components 3, 4, and 5, not yet identified) will require adherence to internationally accepted standards. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Potential dangers from hazardous waste disposal, especially under abnormal or emergency conditions, are inherently high and public awareness is low; this component is clearly "A" category. If this component is dropped or deferred, the project would revert to a "B" rating. STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Procedures for undertaking EA work, including the need for public participation, have been discussed with component sponsors and Terms of Reference agreed. Consultants, under an EC/PHARE grant are being selected. Provided field,work begins in late-1991, a draft report should be ready by the scheduled appraisal date of June 1992. A more elaborate EA is required for the Czech Republic facility because the present site is probably not acceptable. REMARKS: 1-52 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Borrower has been advised of the need to release EA. A formal reply is awaited but is not expected to be a problem. 1-53 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : EGYPT Project ID No.: 5EGTPA128 Project : KUREIMAT POWER PROJECT Sector : Power Managing Division: MN2IE Appr. Date: Jun. 30, 1991 Board Date: Mar. 05, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $1,260.90 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: The project consists of (i) the supply and installation of a net 1200 MW thermal power plant fuelled by natural gas and fuel oil; (ii) the supply of material and equipment for a natural gas pipeline interconnecting the power station to the gas grid; (ii) the supply and installation of transmission lines, line loss reduction equipment and equipment for rehabilitation of Tanta substation; and (v) technical assistance. MAJOR ENVIRONMENTAL ISSUES: Based on the recommendations of the Environmental Impact Assessment Report (EIAR), the Government/EEA/EGPC assured the Bank appraisal mission (July 1991) that (i) EGPC would allocate adequate qualities of natural gas to meet at least 50 percent or more of the fuel require that of the power station to ensure compliance with the environmental standards; (ii) EEA would take adequate measures during design, construction and operation of the power plant to ensure compliance with the environmental standards regarding ambient air, atmospheric emission, water quality and effluent treatment at Kureimat site; and (iii) EEA would pay compensation (in accordance with the law) to the cultivators for loss of agricultural land acquired for the power station and the colony. OTHER ENVIRONMENTAL ISSUES: None. PROPOSED ACTIONS: During negotiations, EEA to submit for the Bank's review the progress report regarding compensation paid to the farmers for the agricultural land acquired for the project. Signing of a subsidiary loan agreement (satisfactory to the Bank) by EEA with EGPC confirming allocation of natural gas to cover 50 percent of the fuel requirement for the power station shall be a condition of loan effectiveness. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The project consists of a thermal power plant and has a significant environmental impact. Accordingly, environmental category A assigned to the project is in line with OD 4.00, Annex A. STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The environmental assessment summary, prepared by the borrower (EEA) 1-54 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS was circulated to the Board on July 11, 1991. Based on the review of the draft EIAR by the appraisal mission, USAID and EEA, the consultants submitted, to the Bank, the final EIAR by the end of July 1991. REMARKS: The Borrower has given permission to release EA. 1-55 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : EGYPT Project ID No.: 5EGTPA147 Project : IND. POLL/EGY CONSERVATION Sector : Energy Managing Division: MN2IE Appr. Date: Jun. 15, 1992 Board Date: Jan. 12, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: July 1992 Total Project Cost: $166.30 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: (i) assisting the three.existing cement plants in Helwan to reduce their emissions and energy consumption down to internationally acceptable levels; (ii) assisting the cement companies in reaching -rated output through selected rehabilitation and improvements in operational, management and maintenance procedures; (iii) preparation of a master abatement plan for major non-cement plants in the Helwan area; and (iv) development of the institutional capacity of the Egyptian Environmental Affairs Agency. MAJOR ENVIRONMENTAL ISSUES: Existing cement companies in Helwan area are producing much higher than internationally acceptable levels of particulated emissions and are consuming excessive levels of energy. Project is designed to reduce emissions and increase energy efficiency. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: The project would finance (i) technical assistance, training and equipment to help cement companies reduce their emissions and improve energy conservation; (ii) technical assistance for preparation of a master plan for pollution reduction down to internationally acceptable levels by the major non-cement polluters in the Helwan area; and (iii) technical assistance, training and equipment/office furniture for the Egyptian Environmental Affairs Agency to develop its monitoring and enforcement capability. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Category B proposed. The project aims at reducing pollution caused by the existing three cement plants. Also, the proposed project would not increase rated capacity. Project investments are for pollution abatement and increased energy efficiency (the latter through improved load management). No major adverse environmental impact is anticipated. STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: REMARKS: Environmental assessment done by KfW will serve as input to project preparation. 1-56 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : EGYPT Project ID No.: 5EGTPA187 Project : TOURISM INFRA. & ENVIRON. Sector : Tourism Managing Division: MN21N Appr. Date: Mar. 27, 1992 Board Date: Sep. 29, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $100.00 Estimated Date for Receipt of EA by Bank: Dec. 19, 1991 MAJOR PROJECT COMPONENTS: Provision of infrastructure (water supply, sewerage, solid waste, road improvement), berthing facilities on the Nile, improvement of access to antiquity sites. MAJOR ENVIRONMENTAL ISSUES: Those normally associated with solid and liquid waste disposal in touristic areas, especially sensitive areas along the Red Sea and Nile River. OTHER ENVIRONMENTAL ISSUES: None. PROPOSED ACTIONS: Environmental assessments are being carried out for all touristic zones being developed under the project. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Strengthening environmental management in tourism development zones is a specific project objective and the project is designed to avoid significant environmental stress related to town development. STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: REMARKS: 1-57 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : HUNGARY Project ID No.: 5HUNPA045 Project : ENERGY/ENVIRONMENT Sector : Energy Managing Division: EM4EE Appr. Date: Jul. 15, 1992 Board Date: Dec. 01, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $125.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: The project involves: (i) renovation of two existing combined heat and power stations and expansion of their power generation; (ii) strengthening of the energy management system of the Hungarian Electricity Board; (iii) possible desulphurization facilities on selected coal power stations; and (iv) strengthening of the environmental management and monitoring capability of the Hungarian Electricity Board. MAJOR ENVIRONMENTAL ISSUES: (a) Atmospheric emissions and standards compliance at the power stations; (b) need to demonstrate that desulphurization has priority in national environmental strategy and that the proposed FGD is the least-cost solution to sulphur removal; (c) management of solid wastes at the coal power stations; (d) noise; (e) disturbances to the terrain and properties traversed by the pipeline; and (f) gas pipeline safety. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: (i) The demonstration noted in environmental issue (b) will need to be made before the component can be accepted for Bank financing; and (ii) Environmental assessments are proposed for components (i), (iii) and (iv). JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Environmental assessments of component (i) are to be included in the feasibility studies scheduled to begin in December 1991, and for component (iv); details of (EA) requirements and scheduling were discussed during September 1991 preparation mission. REMARKS: 1-58 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : MOROCCO Project ID No.: 5MYCPA156 Project : SEWERAGE AND WASTEWATER TREATMENT Sector : Water Supply and Sewerage Managing Division: MN1IN Appr. Date: Oct. 01, 1992 Board Date: Jul. 01, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: 11/1/92 Total Project Cost: $70.00 Estimated Date for Receipt of EA by Bank: 11/12/91 MAJOR PROJECT COMPONENTS: The Sewerage and Wastewater Treatment Project (SWTP) would precede a Wastewater Irrigation Project (WIP) for Casablanca, Khouribga, Agadir, and Settat. The SWTP would include: (a) implementation of sewerage and primary wastewater treatment facilities; and (b) institutional development aiming to set up appropriate organizations for project implementation, operation, and maintenance. The WIP would include secondary and tertiary wastewater treatment facilities and irrigation systems for about 4,750 ha. to be irrigated with the treated wastewater originating from the SWTP. MAJOR ENVIRONMENTAL ISSUES: Environmental issues include: (a) determining appropriate project design; (b) the development and use of standards and guidelines for the safe and sound operation of the project, in particular aiming to protect the health of operating personnel; (c) development of necessary legislation; and (d) the implementation of any required measures to protect the environment against possible negative effects caused by the project. OTHER ENVIRONMENTAL ISSUES: None identified at present. PROPOSED ACTIONS: Project preparation for SWTP has begun as part of the ongoing Sewerage Master Plan Studies for Casablanca and Agadir, Loan 2826 MOR. Khouribga and Settat SWTP will be financed under the new loan and not by 2826 MOR as previously stated. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The major negative impacts from this project could be: (a) extensive marine pollution from the sea outfalls discharging from the SWTP; (b) pollution of aquifers which supply both cities with drinking and irrigation water; and (c) adverse effects on a National Park at Agadir in which the Sewage Treatment Plant will be located. STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Suitable consulting firms have been selected by the GOM to undertake the environmental impact studies for the SWTP. The studies are expected to start in December 1991. Financing will come from the ongoing Bank Loan 2826 MOR - Casablanca Sewerage. 1-59 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : PAKISTAN Project ID No.: 5PAKPA226 Project : GHAZI GHARIALA Sector : Power Managing Division: EMlEG Appr. Date: Apr. 15, 1993 Board Date: Dec. 16, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under discussion Total Project Cost: $2,500.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: (a) a barrage on Indus Tiver, about 7 km downstream of Tarbela Dam; (b) a 52-km long single concrete lined power channel; (c) a power complex with 1,425 MW powerhouse (5 units of 285 MW each) and 15 m.c.m. capacity of Head Ponds. MAJOR ENVIRONMENTAL ISSUES: (a) No major environmental issues. (b) Some issues having environmental impacts are: (i) likely malarial conditions at the barrage pond and head pond; (ii) adequacy of releases in the river downstream of barrage; (iii) land acquisition and disposal of excavated material. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: (a) Pakistan Hydro Consultants (PHC) prepared Draft Environmental Assessment in June 1991. (b) Independent Environmental (composing Mecca, Kwata, Kindler and Dani); (c) some additional monitoring data/study has been advised, w/c is being processed by PHC. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: (a) the additional data/study is scheduled to be completed by September 1991; (b) final EA is planned to be completed by about February 1992. REMARKS: 1-60 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : PAKISTAN Project ID No.: 5PAKPA235 Project : PUNJAB URBAN ENVIRONMENT Sector : Urbanization Managing Division: EMlIN Appr. Date: Oct. 15, 1992 Board Date: Apr. 27, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: 4th Quarter,91 Total Project Cost: $184.60 Estimated Date for Receipt-of EA by Bank: 11/6/91 MAJOR PROJECT COMPONENTS: (a) industrial and hazardous wastewater treatment and disposal; (b) toxic waste cleanup together with construction and management of a treatment and disposal facility; (c) technical strengthening and training for EPA and related sector personnel; (d) a financial facility for private sector assistance to promote/ facilitate environmental cleanup investments; and (e) publicity campaigns to inform and raise public awareness of environmental issues. MAJOR ENVIRONMENTAL ISSUES: Location of incinerator for hospital waste and landfill for municipal waste. Location of facility to management hazardous waste. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: Execution of complete EAs. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: As several of the planned components will be rated to the level A, the whole project is classified with this rating. STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Not yet decided. Most likely the EAs will start in March 1992. REMARKS: 1-61 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : PAKISTAN Project ID No.: 5PAKPA249 Project : Domestic Energy Resources Development Sector : Energy Managing Division: EM1EG Appr. Date: Mar. 01, 1991 Board Date: Jan. 23, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 2nd Quarter,91 Total Project Cost: $250.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: (a) Development of oil and gas fields under joint ventures with the private sector; (b) construction of the Dhodak Condensate Plant, Dhodak-Kot Addu and Qadirpur-spur Gas Pipelines; (c) implementation of measures to mitigate the environmental impact of (a) and (b) above;. (d) corporate restructuring of OGDC; (e) institution of organization reforms within the Ministry of Petroleum and Natural Resources (MPNR); and (f) technical assistance for (d) and (e) above. MAJOR ENVIRONMENTAL ISSUES: As is common with other hydrocarbon exploration, production and delivery projects, the environmental issues involve: land use during and after the drilling operations, pipeline routing, impact on flora and fauna. Given that, one of the fields is around the Indus River, environmental issue of marine life will also arise. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: In order to ensure that the project components are implemented in an environmentally prudent manner, OGDC and SNGPL are carrying out, with the assistance of consultants, an Environmental Assessment. The EA would verify the development plans and engineering designs for the above physical components. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The environmental assessment was conducted and environmental assessment summary was prepared by OGDC and SNGPL and presented to the Executive Directors on August 28, 1991. REMARKS: 1-62 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : TUNISIA Project ID No.: 5TUNPA149 Project : NORTHERN TUNISIA WATER RESOURCE Sector : Water Supply and Sewerage Managing Division: MNlIN Appr. Date: Mar. 06, 1992 Board Date: Sep. 15, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 2nd Quarter, 91 Total Project Cost: $300.00 Estimated Date for Receipt of EA by Bank: 11/12/91 MAJOR PROJECT COMPONENTS: A. Sidi El Barrak dam on the Oued Zouara in Northern Tunisia. B. Additional works to protect rural population against flooding, realignment of roads and railway. C. Rehabilitation, replacement and installation of new measuring equipment. D. Construction of waste water treatment plant in Tunis and Nefza. E. Training, technical assistance, studies, sector-wide MIS and acquisition of computer equipment and software. MAJOR ENVIRONMENTAL ISSUES: The Bank received in August 1991 the dam's environmental impact study which was reviewed and should be improved on (i) presentation of alternative solutions; and (ii) procedures for resettlement. The direct impact of the dam's construction on flora and fauna to be limited. A more detailed assessment of the required procedures for appropriate resettlement of about 800 households has been requested from the consultants. An indirect beneficial effect of the Sidi El Barrak dam project would be the availability of additional fresh water to preserve the National Bird Reserve at Lake Ischkeul, which is currently endangered by the construction of several dams in its basin. A beneficial impact is also expected from the construction of waste water treatment plants in Tunis and Nefza where presently the environment is heavily polluted by the discharge of raw waste water. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Project appraisal will not take place before the results of the environmental assessment, to be carried out by independent consultants, are available as they will enable further definition of total project costs and benefits. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Dam Construction Project is always Category "A." STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Draft TOR for the environmental assessment of the project has been finalized by the Tunisians. The Bank should review them as soon as it receives a copy. 1-63 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : TURKEY Project ID No.: 5TURPA148 Project : BERKE HYDROELECTRIC Sector : Energy Managing Division: EM1EG Appr. Date: JAN. 06, 1992 Board Date: May 28, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $242.30 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: 1. Double curvature thin arch dam of 201 m height. 2. Underground power plant. MAJOR ENVIRONMENTAL ISSUES: 1. Resettlement of 86 people. 2. Closing of the Ilica thermal springs during dam construction. OTHER ENVIRONMENTAL ISSUES: 1. Transmission lines impact. 2. Presence of the Brown Fish Owl. PROPOSED ACTIONS: Mitigation on monitoring plans has been suggested. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The draft Environmental Assessment and Resettlement Plan were presented to the Bank. Final reports will be ready by end-November 1991. REMARKS: The Society for the Protection of Nature, Istanbul Office, Ministry for Environment. Permission to release EA is expected. 1-64 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : TURKEY Project ID No.: 5TURPA206 Project : Coal Pollution Abatement Sector : Power Managing Division: EMIEG Appr. Date: Jun. 10, 1992 Board Date: Mar. 25, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: TBD Total Project Cost: $500.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: The project components have not yet been identified. MAJOR ENVIRONMENTAL ISSUES: OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: REMARKS: 1-65 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : ARGENTINA Project ID No.: 6ARGPA116 Project : Yacyreta II Sector : Energy Managing Division: LA4IE Appr. Date: Feb. 10, 1992 Board Date: Jul. 14, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 01/15/92 Total Project Cost: $2,300.00 Estimated Date for Receipt of EA by Bank: 9/25/91 MAJOR PROJECT COMPONENTS: (1) Yacyreta hydroelectric dam civil works and engineering; and (2) first phase of the transmission system. MAJOR ENVIRONMENTAL ISSUES: Impact of the large Yacyreta reservoir on the population and environment, including loss of wildland ecosystems, involuntary resettlement, and water quality problems. OTHER ENVIRONMENTAL ISSUES: Effects of migratory fish and other aquatic life, innundation of cultural properties, potentially increased public health risks. PROPOSED ACTIONS: Continued monitoring of actions agreed in the Electric Power Sector Project (Loan 2998-AR). Additional mitigatory measures may be identified in the EA study now underway. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Category A is appropriate for a large hydroelectric dam project. STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: On the basis of the assessment of consultants on the Yacyreta's resettlement and environment protection program EBY will submit to the Bank an environment assessment before pre-appraisal. environmental assessment by appraisal; no new major issues are expected. REMARKS: 1-66 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : BOLIVIA Project ID No.: 6BOLPA048 Project : Power/Gas Pipeline Sector : Energy Managing Division: LA3IE Appr. Date: Nov. 19, 1990 Board Date: Jul. 14, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 1st Quarter,92 Total Project Cost: $620.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: Construction of gas pipeline from near Santa Cruz to Puerto Suarez at Brazilean border (557 km); construction of 450 MW gas-fired power plant at Puerto Suarez for sale of electricity to Brazil. MAJOR ENVIRONMENTAL ISSUES: Impact of pipeline on fragile ecosystems and indigenous people, both during construction and thereafter due to opening up of virgin areas. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: Consultants completed environmental impact study to evaluate alternative alignments and recommend on mitigatory measures, on the shortest route between Santa Cruz and Puerto Suarez. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The Environmental Report contracted by YPFB was reviewed by appraisal team in Bolivia in February 1991. It is now evaluating it and developing conditionality necessary to ensure that the proposed mitigation program will be appropriately implemented. REMARKS: Borrower has given permission to release EA. 1-67 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHILE Project ID No.: 6CHLPA036 Project : Irrigation Development Sector : Agriculture & Rural Devt Managing Division: LA4AG Appr. Date: May 15, 1992 Board Date: Mar. 16, 1993 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: 3rd Quarter, 91 Total Project Cost: $100.00 Estimated Date for Receipt of EA by Bank: 4/20/88 MAJOR PROJECT COMPONENTS: - Public investment in rehabilitation, modernization and construction of small and medium-sized irrigation schemes. - Enhanced implementation of the Irrigation Development Law which supports private investment in small scale and on-farm works. - Support to strengthen user associations in operating and maintaining irrigation schemes. - Strengthening, as appropriate, public agencies involved in irrigation, including their capacity to assess and mitigate for dealing with these issues. MAJOR ENVIRONMENTAL ISSUES: The main issues would be identified with a sectoral EIA to be undertaken during preparation. The study would focus on environmental problem in agriculture related to irrigation. It would also review the existing institutional and legal framework for dealing with these issues. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The first draft of the EA has been received and is currently under review by LATEN and LA4AG. GOC has released a summary of the findings and conclusion of the draft EA and has met with NGOs to inform them of project objectives and activities as well as procedures for screening and assessing investments. Profiles of proposed first-year investment will be discussed with NGOs at both regional and national levels in the coming months. REMARKS: 1-68 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : COLOMBIA Project ID No.: 6CLMPAl92 Project : Pollution Abatement and Sanitation Sector : Water Supply and Sewerage Managing Division: LA3IE Appr. Date: May 15, 1992 Board Date: Jan. 15, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $500.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: The project would include: major sewerage and drainage networks; initial works for abating pollution of the Bogota river; secondary water supply networks; and consultancies and training. MAJOR ENVIRONMENTAL ISSUES: While the long-term impacts are environmentally beneficial, issues to be addressed include: (a) impact of sewage and storm drainage works upon threatened wetlands in the project area; (b) short and long-term impact of worksupon residents along works corridors; (c) removal and safe disposal of, construction wastes and (possibly toxic wastes), dredging sludges from some existing sewage and storm drainage channels. OTHER ENVIRONMENTAL ISSUES: Short-term environmental impacts (dust, noise, air pollution) of construction process. PROPOSED ACTIONS: Protection of threatened wetlands in Park system which could protect rare species and improve environmental quality are being studied. Land acquisition strategy and resettlement plan being finalized; solutions for removal and safe disposal of construction wastes and dredging sludges being developed. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The project classification "A" is correct. All former class "D" (Environment - enhancing) projects due classed as "A" under the new (October 3, 1991) version of the OD 4.01. Projects involving works of the dimensions foreseen in this project are certainly classed as "A"s. STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EA TORs for proposed works components reviewed by Bank, November 1991. EA for proposed works components prior to appraisal. REMARKS: EA TORs were reviewed and progress will be monitored by Bogota V Project Steering Committee, made up of: Proponent; Regional Autonomous Corporation (CAR) with overall responsibility for natural resources in the project area; the City of Bogota Environmental Office (DAMA) with close links to local NGOs, universities and neighborhood associations; City Services Department (EDIS) responsible for garbage disposal and management of urban public places; National Planning Department Environmental Policy Division (DNP-DEPAC); Regional Government of Cundinamarca. The EAs will be reviewed with and released to the public. 1-69 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : MEXICO Project ID No.: 6MXCPA111 Project : Rainfed Areas Development Sector : Agriculture & Rural Devt Managing Division: LA2AG Appr. Date: Sep. 15, 1992 Board Date: Jul. 13, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $400.00 Estimated Date for Receipt of EA by Bank: MAJOR PROJECT COMPONENTS: (i) Tropical land development: (a) drainage; (b) irrigation; (c) clearing; and (ii) Rural development: (a) stores; (b) roads. MAJOR ENVIRONMENTAL ISSUES: Impact of tropical land development on sustainable productivity. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Ongoing in Project Tropical Agriculture II (Loan 2658-ME). REMARKS: 1-70 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : PARAGUAY Project ID No.: 6PARPAO71 Project : Regional Agriculture Development Sector : Agriculture & Rural Devt Managing Division: LA4AG Appr. Date: May 15, 1992 Board Date: Jan. 15, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: TBD Total Project Cost: $60.00 Estimated Date for Receipt of EA by Bank: 4/20/90 MAJOR PROJECT COMPONENTS: Regional agricultural development in the Departmentsof Alto Parana and Itapua (norte) including consolidation of settlements, infrastructure, agricultural services, environmental protection and institutional strengthening. MAJOR ENVIRONMENTAL ISSUES: Deforestation for agricultural purposes, without proper land use planning or use of proper soil conservation technology; indigenous communities; increasing population pressures on land resources. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: Detailed design of watershed management and resource conservation to be undertaken using PHRD grant during the late stages of project preparation. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Important environmental issues, which can be dealt with directly in the project's design. STATUS OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Not yet started. To be determined when preparation report is received (December 1991). REMARKS: 1-71 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : ANGOLA Project ID No.: 3ANGPA001 Project : Fisheries Resources Management Sector : Agriculture & Rural Devt Managing Division: AF3AG Appr. Date: JAN. 15, 1993 Board Date: Sep. 15, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $75.00 Estimated Date for Receipt of EA by Bank: Country : ANGOLA Project ID No.: 3ANGPA010 Project : LOBITO PORT TRANS Sector : Transportation Managing Division: AF3IN Appr. Date: Nov. 15, 1992 Board Date: Sep. 28, 1993 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Total Project Cost: $168.00 Estimated Date for Receipt of EA by Bank: Country : BENIN Project ID No.: 3BENPAO36 Project : Urban Rehabilitation and Management Sector : Urbanization Managing Division: AFlIN Appr. Date: Apr. 13, 1991 Board Date: Feb. 18, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $26.80 Estimated Date for Receipt of EA by Bank: Country : BURUNDI Project ID No.: 3BUIPA048 Project : Natural Resource Management Sector : Agriculture & Rural Devt Managing Division: AF3AG Appr. Date: Sep. 15, 1992 Board Date: May 11, 1993 Lending Instrument: Sector Adjustment Loan Status: Standby Date EA Category Assigned: Total Project Cost: $100.00 Estimated Date for Receipt of EA by Bank: 11/4/91 Country : BURKINA FASO Project ID No.: 3BURPA037 Project : Transport Sector Adjustment Loan Sector : Transportation Managing Division: AF5IN Appr. Date: Apr. 06, 1991 Board Date: Feb. 04, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $453.00 Estimated Date for Receipt of EA by Bank: 1-72 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : CAMEROON Project ID No.: 3CAMPA068 Project : Agriculture Research II Sector : Agriculture & Rural Devt Managing Division: AFlAG Appr. Date: Jun. 25, 1992 Board Date: Jun. 15, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Not required Total Project Cost: $25.00 Estimated Date for Receipt of EA by Bank: Country : CAMEROON Project ID No.: 3CAMPA082 Project : Transport Sector Project Sector : Public Sector Management Managing Division: AFlIN Appr. Date: JAN. 20, 1993 Board Date: Jun. 15, 1993 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: 4th Quarter,92 Total Project Cost: $200.00 Estimated Date for Receipt of EA by Bank: 11/27/91 Country : CAMEROON Project ID No.: 3CAMPAO87 Project : Urban Management Improvement Sector : Urbanization Managing Division: AFiIN Appr. Date: Feb. 26, 1993 Board Date: Dec. 07, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Not required Total Project Cost: $40.00 Estimated Date for Receipt of EA by Bank: IEPS - 07/31/91 Country : CAMEROON Project ID No.: 3CAMPA088 Project : Export Promotion & Diversification Sector : Agriculture & Rural Devt Managing Division: AFlAG Appr. Date: Jun. 22, 1992 Board Date: May 25, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $50.00 Estimated Date for Receipt of EA by Bank: Country : ETHIOPIA Project ID No.: 3ETHPAO68 Project : Peasant Coffee Development Sector : Agriculture & Rural Devt Managing Division: AF2AG Appr. Date: Jun. 09, 1989 Board Date: Jun. 29, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Completed Total Project Cost: $80.00 Estimated Date for Receipt of EA by Bank: 1-73 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : ETHIOPIA Project ID No.: 3ETHPAO78 Project : Road Rehabilitation Sector : Transportation Managing Division: AF21N Appr. Date: Sep. 10, 1990 Board Date: May 19, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Not Started Total Project Cost: $100.00 Estimated Date for Receipt of EA by Bank: Country : ETHIOPIA Project ID No.: 3ETHPAO96 Project : National Seeds Sector : Agriculture & Rural Devt Managing Division: AF2AG Appr. Date: Apr. 03, 1992 Board Date: Dec. 08, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $55.00 Estimated Date for Receipt of EA by Bank: Country : ETHIOPIA Project ID No.: 3ETHPA102 Project : Natural Gas & Petroleum Sector : Industry Managing Division: AF2IE Appr. Date: Apr. 06, 1992 Board Date: Oct. 06, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 2nd Quarter 1992 Total Project Cost: $50.00 Estimated Date for Receipt of EA by Bank: Country : GHANA Project ID No.: 3GHAPAO92 Project : Rural Water/Works Sector : Water Supply and Sewerage Managing Division: AF4IN Appr. Date: Nov. 06, 1992 Board Date: Jul. 13, 1993 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $42.00 Estimated Date for Receipt of EA by Bank: 10/92 Country : GHANA Project ID No.: 3GHAPAO99 Project : Agricultural Extension Sector : Agriculture & Rural Devt Managing Division: AF4AG Appr. Date: May 10, 1991 Board Date: Feb. 11, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $40.00 Estimated Date for Receipt of EA by Bank: 11/91 I-74 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : GHANA Project ID No.: 3GHAPA102 Project : Feeder Roads Sector : Transportation Managing Division: AF4IN Appr. Date: Jun. 14, 1991 Board Date: Dec. 19, 1991 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Completed Total Project Cost: $106.00 Estimated Date for Receipt of EA by Bank: 08/90 Country : GHANA Project ID No.: 3GHAPA104 Project : URBAN III Sector : Urbanization Managing Division: AF4IN Appr. Date: JAN. 04, 1993 Board Date: Jul. 13, 1993 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $48.00 Estimated Date for Receipt of EA by Bank: 10/92 Country : GUINEA Project ID No.: 3GUIPAO26 Project : Power II Sector : Power Managing Division: AFlIE Appr. Date: Dec. 15, 1991 Board Date: Apr. 28, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 4th Quarter,90 Total Project Cost: $120.00 Estimated Date for Receipt of EA by Bank: Country : GUINEA Project ID No.: 3GUIPA052 Project : Transportation and Urban Infrastructure Sector : Transportation Managing Division: AFlIN Appr. Date: May 06, 1992 Board Date: Dec. 22, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 3/23/92 Total Project Cost: $30.00 Estimated Date for Receipt of EA by Bank: Country : COTE DIVOIRE Project ID No.: 3IVCPA084 Project : Transport Sector Sector : Transportation Managing Division: AFlIN Appr. Date: Apr. 15, 1992 Board Date: Oct. 06, 1992 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: June 30, 1992 Total Project Cost: $250.00 Estimated Date for Receipt of EA by Bank: I-75 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : COTE DIVOIRE Project ID No.: 3IVCPAO91 Project : Private Sector Energy Sector : Power Managing Division: AFlIE Appr. Date: May 03, 1992 Board Date: Feb. 02, 1993 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $250.00 Estimated Date for Receipt of EA by Bank: 11/26/91 Country : COTE DIVOIRE Project ID No.: 3IVCPAO92 Project : Telecommunications III Sector : Communications Managing Division: AFlIE Appr. Date: Oct. 15, 1992 Board Date: Jun. 15, 1993 Lending Instrument: Sector Investment and Maintenance Status: Standby Date EA Category Assigned: Under Discussion Total Project Cost: $40.00 Estimated Date for Receipt of EA by Bank:. Country : KENYA Project ID No.: 3KENPA102 Project : Urban Transport Sector : Urbanization Managing Division: AF2IN Appr. Date: Sep. 01, 1992 Board Date: Jul. 27, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $200.00 Estimated Date for Receipt of EA by Bank: Country : KENYA Project ID No.: 3KENPA146 Project : Mombasa Water Engineering II Sector : Water Supply and Sewerage Managing Division: AF21N Appr. Date: Jun. 11, 1991 Board Date: Jan. 28, 1992 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: 1st Quarter,91 Total Project Cost: $44.00 Estimated Date for Receipt of EA by Bank: Country : LESOTHO Project ID No.: 3LESPA030 Project : INFRA MAINT Sector : Transportation Managing Division: AF6IN Appr. Date: Aug. 15, 1992 Board Date: Mar. 16, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Total Project Cost: $30.00 Estimated Date for Receipt of EA by Bank: 1-76 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : MADAGASCAR Project ID No.: 3MAGPAO67 Project : Energy II Sector : Energy Managing Division: AF3IE Appr. Date: Jun. 15, 1992 Board Date: Nov. 24, 1992 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: 3rd Quarter,91 Total Project Cost: $80.00 Estimated Date for Receipt of EA by Bank: 11/26/91 Country : MADAGASCAR Project ID No.: 3MAGPA068 Project : Transport Sector Development Sector : Transportation Managing Division: AF3IN Appr. Date: Feb. 04, 1992 Board Date: Jul. 14, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $80.00 Estimated Date for Receipt of EA by Bank: Country : MADAGASCAR Project ID No.: 3MAGPAO92 Project : Petroleum Sector Adjustment Sector : Energy Managing Division: AF3IE Appr. Date: Jun. 15, 1991 Board Date: Apr. 28, 1992 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $50.00 Estimated Date for Receipt of EA by Bank: 11/26/91 Country : MADAGASCAR Project ID No.: 3MAGPAO96 Project : URBAN II Sector : Urbanization Managing Division: AF3IN Appr. Date: JAN. 15, 1993 Board Date: Oct. 12, 1993 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Total Project Cost: $90.00 Estimated Date for Receipt of EA by Bank: Country : MADAGASCAR Project ID No.: 3MAGPAO97 Project : National Extension Sector : Agriculture & Rural Devt Managing Division: AF3AG Appr. Date: JAN. 15, 1993 Board Date: Nov. 16, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Total Project Cost: $35.00 Estimated Date for Receipt of EA by Bank: 1-77 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : MADAGASCAR Project ID No.: 3MAGPA108 Project : EXP CROP PROMOTION Sector : Agriculture & Rural Devt Managing Division: AF3AG Appr. Date: Jul. 15, 1992 Board Date: Feb. 23, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Total Project Cost: $30.00 Estimated Date for Receipt of EA by Bank: Country : MALAWI Project ID No.: 3MALPAO74 Project : Agricultural Services Sector : Agriculture & Rural Devt Managing Division: AF6AG Appr. Date: Jun. 01, 1992 Board Date: Feb. 09, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $40.00 Estimated Date for Receipt of EA by Bank: Country : MALI Project ID No.: 3MLIPA048 Project : Infrastructure/Transport Sector Sector : Transportation Managing Division: AF5IN Appr. Date: JAN. 15, 1993 Board Date: Jul. 13, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Under Discussion Total Project Cost: $80.00 Estimated Date for Receipt of EA by Bank: 11/27/91 Country : MALI Project ID No.: 3MLIPAO65 Project : Private Sector Development Sector : Industry Managing Division: AF5IE Appr. Date: Feb. 15, 1992 Board Date: Jun. 23, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $35.00 Estimated Date for Receipt of EA by Bank: Country : MOZAMBIQUE Project ID No.: 3MOZPAO22 Project : Agricultural Services Rehabilitation and Development Sector : Agriculture & Rural Devt Managing Division: AF6AG Appr. Date: Jul. 15, 1991 Board Date: Feb. 11, 1992 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Done Total Project Cost: $40.60 Estimated Date for Receipt of EA by Bank: 1-78 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : MOZAMBIQUE Project ID No.: 3MOZPA031 Project : Roads and Coastal Shipping Sector : Transportation Managing Division: AF6IN Appr. Date: Sep. 16, 1991 Board Date: May 26, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $30Q.00 Estimated Date for Receipt of EA by Bank: Country : MOZAMBIQUE Project ID No.: 3MOZPA032 Project : Urban Rehabilitation II Sector : Urbanization Managing Division: AF6IN Appr. Date: May 15, 1992 Board Date: Mar. 16, 1993 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Total Project Cost: $80.00 Estimated Date for Receipt of EA by Bank: Country : MOZAMBIQUE Project ID No.: 3MOZPAO37 Project : Rural Restructuring Sector : Agriculture & Rural Devt Managing Division: AF6AG Appr. Date: Jun. 29, 1992 Board Date: Apr. 01, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 30,91 Total Project Cost: $90.00 Estimated Date for Receipt of EA by Bank: Country : MAURITANIA Project ID No.: 3MTAPAO55 Project : WATER SUPPLY Sector : Water Supply and Sewerage Managing Division: AF5IN Appr. Date: Feb. 07, 1992 Board Date: May 19, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $65.00 Estimated Date for Receipt of EA by Bank: 10/10/91 Country : NIGER Project ID No.: 3NIGPA044 Project : Infrastructure/Transport Sector II Sector : Transportation Managing Division: AF5IN Appr. Date: Nov. 25, 1990 Board Date: May 12, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $193.50 Estimated Date for Receipt of EA by Bank: 11/27/91 1-79 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : NIGER Project ID No.: 3NIGPA058 Project : Municipal Infrastructure Sector : Urbanization Managing Division: AF5IN Appr. Date: Feb. 15, 1993 Board Date: Jul. 13, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $50.00 Estimated Date for Receipt of EA by Bank: 11/27/91 Country : NIGER Project ID No.: 3NIGPAO61 Project : Private Irrigation Sector : Agriculture & Rural Devt Managing Division: AF5AG Appr. Date: Jun. 19, 1991 Board Date: Mar. 31, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $12.00 Estimated Date for Receipt of EA by Bank: Country : NIGERIA Project ID No.: 3NIRPAO78 Project : Power VIII Sector : Power Managing Division: AF41E Appr. Date: Sep. 06, 1991 Board Date: Sep. 01, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $450.00 Estimated Date for Receipt of EA by Bank: Country : NIGERIA Project ID No.: 3NIRPA107 Project : Multi-State Water Supply I Sector : Water Supply and Sewerage Managing Division: AF4IN Appr. Date: May 26, 1991 Board Date: Apr. 21, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $175.00 Estimated Date for Receipt of EA by Bank: 12/89 Country : NIGERIA Project ID No.: 3NIRPA138 Project : National Agricultural Technological Support Sector : Agriculture & Rural Devt Managing Division: AF4AG Appr. Date: Mar. 03, 1991 Board Date: Apr. 21, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $60.00 Estimated Date for Receipt of EA by Bank: 02/13/91 I-80 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : NIGERIA Project ID No.: 3NIRPA142 Project : Railways Sector : Transportation Managing Division: AF4IN Appr. Date: May 28, 1992 Board Date: Apr. 20, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $200.00 Estimated Date for Receipt of EA by Bank: 11/26/91 Country : NIGERIA Project ID No.: 3NIRPA146 Project : Fadama Development (Small Irrigation) Sector : Agriculture & Rural Devt Managing Division: AF4AG Appr. Date: Mar. 02, 1991 Board Date: Mar. 31, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 9/9/91 Total Project Cost: $105.90 Estimated Date for Receipt of EA by Bank: 09/20/90 Country : NIGERIA Project ID No.: 3NIRPA163 Project : Lagos Urban Transport Sector : Urbanization Managing Division: AF4IN Appr. Date: Jul. 14, 1992 Board Date: May 11, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Init. FY92 Total Project Cost: $100.00 Estimated Date for Receipt of EA by Bank: 06/92 Country : RWANDA Project ID No.: 3RWAPA045 Project : Communal Development Sector : Urbanization Managing Division: AF3IN Appr. Date: Feb. 10, 1993 Board Date: Nov. 16, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: TBD Total Project Cost: $50.20 Estimated Date for Receipt of EA by Bank: 11/26/91 Country : RWANDA Project ID No.: 3RWAPA052 Project : Energy Sector Sector : Power Managing Division: AF3IE Appr. Date: Apr. 15, 1992 Board Date: Feb. 16, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Under Discussion Total Project Cost: $55.00 Estimated Date for Receipt of EA by Bank: 11/26/91 I-81 ENVIRONMENTAL DATA SHEET-FOR CATEGORY "B" PROJECTS Country : RWANDA Project ID No.: 3RWAPAO72 Project : SOCIAL ACTION PROJECT Sector : Population Managing Division: AF3PH Appr. Date: Nov. 29, 1991 Board Date: May 26, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $35.00 Estimated Date for Receipt of EA by Bank: Country : SENEGAL Project ID No.: 3SENPAO76 Project : Water Supply III Sector : Water Supply and Sewerage Managing Division: AF5IN Appr. Date: Mar. 28, 1991 Board Date: Nov. 17, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $298.00 Estimated Date for Receipt of EA by Bank: Country : SENEGAL Project ID No.: 3SENPAO78 Project : Energy II Sector : Power Managing Division: AF5IE Appr. Date: Apr. 20, 1992 Board Date: Oct. 06, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $120.00 Estimated Date for Receipt of EA by Bank: Country : SENEGAL Project ID No.: 3SENPAO94 Project : Private Sector Sector : Industry Managing Division: AF5IE Appr. Date: Feb. 10, 1992 Board Date: Sep. 15, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $30.00 Estimated Date for Receipt of EA by Bank: Country : SEYCHELLES Project ID No.: 3SEYPA006 Project : Infrastructure/Environment Sector : Water Supply and Sewerage Managing Division: AF3IN Appr. Date: Feb. 10, 1992 Board Date: May 26, 1992 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Ongoing Total Project Cost: $72.00 Estimated Date for Receipt of EA by Bank: 11/26/91 1-82 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : SIERRA LEONE Project ID No.: 3SILPAO21 Project : Roads Rehabilitation & Maintenance Sector : Transportation Managing Division: AF4IN Appr. Date: Apr. 03, 1992 Board Date: Sep. 15, 1992 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Total Project Cost: $100.00 Estimated Date for Receipt of EA by Bank: 10/21/91 Country : SIERRA LEONE Project ID No.: 3SILPA025 Project : Power Sector Rehabilitation Sector : Power Managing Division: AF4IE Appr. Date: Oct. 27, 1989 Board Date: Mar. 26, 1992 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Completed Total Project Cost: $55.90 Estimated Date for Receipt of EA by Bank: Country : SAO TOME & P Project ID No.: 3STPPA004 Project : Agricultural Sector Development Sector : Agriculture & Rural Devt Managing Division: AF4AG Appr. Date: May 25, 1991 Board Date: Dec. 19, 1991 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $11.30 Estimated Date for Receipt of EA by Bank: Country : SWAZILAND Project ID No.: 3SWAPAO22 Project : Urban Development I Sector : Urbanization Managing Division: AF6IN Appr. Date: Sep. 15, 1992 Board Date: Sep. 13, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $50.00 Estimated Date for Receipt of EA by Bank: Country : TANZANIA Project ID No.: 3TANPA105 Project : Industrial Restructuring Sector : Industrial Devel/Finance Managing Division: AF6IE Appr. Date: JAN. 15, 1992 Board Date: Jun. 16, 1992 Lending Instrument: Sector Adjustment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $140.00 Estimated Date for Receipt of EA by Bank: 1-83 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : TANZANIA Project ID No.: 3TANPA108 Project : Telecommunications III Sector : Communications Managing Division: AF6IE Appr. Date: Jul. 12, 1992 Board Date: Jun. 22, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $120.00 Estimated Date for Receipt of EA by Bank: Country : TANZANIA Project ID No.: 3TANPA113 Project : Forestry Resources Management Sector : Agriculture & Rural Devt Managing Division: AF6AG Appr. Date: Sep. 17, 1990 Board Date: Mar. 24, 1992 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Completed Total Project Cost: $25.50 Estimated Date for Receipt of EA by Bank: Country : TANZANIA Project ID No.: 3TANPA139 Project : ENGINEERING CREDIT Sector : Transportation Managing Division: AF6IE Appr. Date: May 13, 1991 Board Date: Dec. 19, 1991 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $10.00 Estimated Date for Receipt of EA by Bank: Country : TOGO Project ID No.: 3TOGPAO22 Project : Agricultural Services Rehabilitation Sector : Agriculture & Rural Devt Managing Division: AFlAG Appr. Date: Feb. 26, 1990 Board Date: Mar. 03, 1992 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Completed Total Project Cost: $21.10 Estimated Date for Receipt of EA by Bank: Country : TOGO Project ID No.: 3TOGPAO39 Project : Lome Urban Development Sector : Urbanization Managing Division: AFlIN Appr. Date: May 15, 1992 Board Date: Dec. 22, 1992 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Not required Total Project Cost: $30.00 Estimated Date for Receipt of EA by Bank: 5/15/90 1-84 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : UGANDA Project ID No.: 3UANPAO30 Project : Transport Sector Rehabilitation Sector : Transportation Managing Division: AF2IN Appr. Date: Apr. 15, 1992 Board Date: Nov. 03, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $60.00 Estimated Date for Receipt of EA by Bank: Country : UGANDA Project ID No.: 3UANPA045 Project : Agric. Res & Extension Sector : Agriculture & Rural Devt Managing Division: AF2AG Appr. Date: Apr. 15, 1992 Board Date: Jan. 19, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $20.00 Estimated Date for Receipt of EA by Bank: Country : UGANDA Project ID No.: 3UANPA088 Project : NORTHERN RECONSTRUCTION Sector : Urbanization Managing Division: AF2IN Appr. Date: Sep. 16, 1991 Board Date: Mar. 24, 1992 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Total Project Cost: $77.30 Estimated Date for Receipt of EA by Bank: Country : ZAIRE Project ID No.: 3ZAIPA104 Project : Urban Environment Sector : Urbanization Managing Division: AF3IN Appr. Date: Apr. 19, 1989 Board Date: Jul. 14,.1992 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Completed Total Project Cost: $16.50 Estimated Date for Receipt of EA by Bank: Country : ZAMBIA Project ID No.: 3ZAMPAO70 Project : Export Diversification Sector : Agriculture & Rural Devt Managing Division: AF6AG Appr. Date: Jun. 26, 1992 Board Date: Apr. 06, 1993 Lending Instrument: Sector Investment and Maintenance Status: Standby Date EA Category Assigned: 2nd Quarter,91 Total Project Cost: $65.00 Estimated Date for Receipt of EA by Bank: 1-85 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : ZAMBIA Project ID No.: 3ZAMPAO73 Project : Marketing & Process Sector : Agriculture & Rural Devt Managing Division: AF6AG Appr. Date: Feb. 20, 1992 Board Date: Jun. 23, 1992 Lending Instrument: Sector Investment and Maintenance Status: Standby Date EA Category Assigned: Total Project Cost: $95.00 Estimated Date for Receipt of EA by Bank: Country : ZIMBABWE Project ID No.: 3ZIMPA046 Project : Urban Transportation Sector : Urbanization Managing Division: AF6IN Appr. Date: JAN. 14, 1991 Board Date: Jun. 16, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $240.00 Estimated Date for Receipt of EA by Bank: Country : ZIMBABWE Project ID No.: 3ZIMPA047 Project : Power Distribution Sector : Power Managing Division: AF6IE Appr. Date: Jul. 15, 1990 Board Date: Mar. 24, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $48.50 Estimated Date for Receipt of EA by Bank: Country : ZIMBABWE Project ID No.: 3ZIMPA064 Project : Energy Sector I Sector : Power Managing Division: AF6IE Appr. Date: Dec. 01, 1992 Board Date: Sep. 14, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Total Project Cost: $1,000.00 Estimated Date for Receipt of EA by Bank: 1-86 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : BANGLADESH Project ID No.: 4BANPA119 Project : Agricultural & Rural Credit II Sector : Agriculture & Rural Devt Managing Division: AS1AG Appr. Date: Jun. 21, 1990 Board Date: Jun. 23, 1992 Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $151.00 Estimated Date for Receipt of EA by Bank: Country : BANGLADESH Project ID No.: 4BANPA121 Project : Private Sector Industrial Credit Sector : Industrial Devel/Finance Managing Division: ASlIE Appr. Date: Jun. 22, 1990 Board Date: Mar. 31, 1992 Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $40.00 Estimated Date for Receipt of EA by Bank: Country : BANGLADESH Project ID No.: 4BANPA132 Project : ROAD REHABILITATION & MAINTENANCE II Sector : Transportation Managing Division: AS1IN Appr. Date: Feb. 01, 1992 Board Date: Sep. 29, 1992 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Under discussion Total Project Cost: $126.00 Estimated Date for Receipt of EA by Bank: 2/12/90 Country : BANGLADESH Project ID No.: 4BANPA137 Project : Forest Resources Management Sector : Agriculture & Rural Devt Managing Division: AS1AG Appr. Date: Nov. 11, 1991 Board Date: Apr. 28, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: No EA required Total Project Cost: $63.00 Estimated Date for Receipt of EA by Bank: Country : BANGLADESH Project ID No.: 4BANPA149 Project : Dhaka Water Supply & Sanitation Sector : Water Supply and Sewerage Managing Division: ASlIN Appr. Date: Mar. 01, 1993 Board Date: Sep. 28,;1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: TBD Total Project Cost: $250.00 Estimated Date for Receipt of EA by Bank: 02-12-90 1-87 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : BANGLADESH Project ID No.: 4BANPA167 Project : THIRD CHITTAGONG WATER SUPPLY PROJECT Sector : Water Supply and Sewerage Managing Division: AS11N Appr. Date: Dec. 04, 1991 Board Date: Apr. 28, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: March 1992 Total Project Cost: $25.00 Estimated Date for Receipt of EA by Bank: Country : BANGLADESH Project ID No.: 4BANPA192 Project : Power Rehabilitation & Distribution Sector : Power Managing Division: ASIE Appr. Date: Dec. 01, 1989 Board Date: Jun. 23, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $244.60 Estimated Date for Receipt of EA by Bank: Country : BANGLADESH Project ID No.: 4BANPA200 Project : Gas III Sector : Energy Managing Division: ASlIE Appr. Date: Jun. 10, 1992 Board Date: Jan. 26, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $150.00 Estimated Date for Receipt of EA by Bank: Country : BANGLADESH Project ID No.: 4BANPA212 Project : Flood Protection I Sector : Agriculture & Rural Devt Managing Division: AS1AG Appr. Date: May 15, 1992 Board Date: Feb. 09, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $100.00 Estimated Date for Receipt of EA by Bank: 5/31/90 Country : BANGLADESH Project ID No.: 4BANPA216 Project : Cyclone Protection II Sector : Agriculture & Rural Devt Managing Division: AS1AG Appr. Date: May 15, 1992 Board Date: Mar. 30, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $97.00 Estimated Date for Receipt of EA by Bank: 1-88 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : CHINA Project ID No.: 4CHAPAO64 Project : Zhejiang Multi-Cities Sector : Urbanization Managing Division: EA2EH Appr. Date: JAN. 13, 1992 Board Date: Jul. 14, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $260.00 Estimated Date for Receipt of EA by Bank: Country : CHINA Project ID No.: 4CHAPA102 Project : Changchun Water Supply Sector : Water Supply and Sewerage Managing Division: EA2EH Appr. Date: Feb. 03, 1992 Board Date: Sep. 01, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $205.00 Estimated Date for Receipt of EA by Bank: Country : CHINA Project ID No.: 4CHAPA126 Project : SHANGHAI INDUSTRIAL EFFICIENCY Sector : Industrial Devel/Finance Managing Division: EA2IE Appr. Date: JAN. 15, 1993 Board Date: Aug. 17, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $150.00 Estimated Date for Receipt of EA by Bank: Country : CHINA Project ID No.: 4CHAPA127 Project : Tianjin Industrial Development Sector : Industrial Devel/Finance Managing Division: EA2IE Appr. Date: Jun. 07, 1992 Board Date: Mar. 16, 1993 Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $100.00 Estimated Date for Receipt of EA by Bank: Country : CHINA Project ID No.: 4CHAPA155 Project : SICHUAN AGRICULTURE DEVELOPMENT Sector : Agriculture & Rural Devt Managing Division: EA2AG Appr. Date: Nov. 08, 1991 Board Date: Jul. 07, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $311.00 Estimated Date for Receipt of EA by Bank: 5/23/91 1-89 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : CHINA Project ID No.: 4CHAPA162 Project : TIANJIN URBAN DEVELOPMENT & ENVIRONMENT Sector : Urbanization Managing Division: EA2EH Appr. Date: Apr. 28, 1991 Board Date: Jul. 07, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date'EA Category'Assigned: Completed Total Project Cost: $200.00 Estimated Date for Receipt of EA by Bank: Country : CHINA Project ID No.: 4CHAPA164 Project : Railways VI Sector : Transportation Managing Division: EA2TP Appr. Date: Jun. 30, 1992 Board Date: Apr. 13, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $400.00 Estimated Date for Receipt of EA by Bank: Country : CHINA Project ID No.: 4CHAPA167 Project : Jiangsu Chemical Sector Sector : Industrial Devel/Finance Managing Division: EA2IE Appr. Date: Feb. 05, 1990 Board Date: Mar. 24, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $333.70 Estimated Date for Receipt of EA by Bank: Country : CHINA Project ID No.: 4CHAPA179 Project : Shenyang Engineering Industry (SEIP) Sector : Industry Managing Division: EA21E Appr. Date: Jun. 15, 1992 Board Date: Jul. 13, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $100.00 Estimated Date for Receipt of EA by Bank: Country : CHINA Project ID No.: 4CHAPA181 Project : Rural Water Supply II Sector : Water Supply and Sewerage Managing Division: EA2EH Appr. Date: May 10, 1991 Board Date: Feb. 11, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $189.10 Estimated Date for Receipt of EA by Bank: 1-90 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : CHINA Project ID No.: 4CHAPA189 Project : RED SOILS II LAND REHABILITATION Sector : Agriculture & Rural Devt Managing Division: EA2AG Appr. Date: Apr. 04, 1993 Board Date: Nov. 23, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $385.00 Estimated Date for Receipt of EA by Bank: Country : CHINA Project ID No.: 4CHAPA224 Project : SHIPS' WASTE DISPOSAL FACILITIES Sector : Transportation Managing Division: EA2TP Appr. Date: Apr. 15, 1991 Board Date: Mar. 17, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: TBD Total Project Cost: $64.10 Estimated Date for Receipt of EA by Bank: Country : FIJI Project ID No.: 4FIJPAO20 Project : ROADS Sector : Transportation Managing Division: EA3IN Appr. Date: Feb. 02, 1992 Board Date: Jun. 09, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $70.00 Estimated Date for Receipt of EA by Bank: Country : INDIA Project ID No.: 4INDPA303 Project : Power Utilities Efficiency Improvement Sector : Power Managing Division: AS4EG Appr. Date: Apr. 19, 1990 Board Date: Jan. 14, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $625.30 Estimated Date for Receipt of EA by Bank: Country : INDIA Project ID No.: 41NDPA336 Project : Shrimp and Fish Culture Sector : Agriculture & Rural Devt Managing Division: AS4AG Appr. Date: Jun. 24, 1991 Board Date: Jan. 21, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $100.00 Estimated Date for Receipt of EA by Bank: 1-91 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : INDIA Project ID No.: 4INDPA361 Project : NATIONAL HGIHWAYS II Sector : Transportation Managing Division: AS4IN Appr. Date: May 07, 1990 Board Date: Mar. 17, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $338.70 Estimated Date for Receipt of EA by Bank: Country : INDIA Project ID No.: 41NDPA368 Project : Railways Productivity Improvement Sector : Transportation Managing Division: AS4IN Appr. Date: Mar. 15, 1991 Board Date: Feb. 25, 1992 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $1,425.00 Estimated Date for Receipt of EA by Bank: Country : INDIA Project ID No.: 41NDPA376 Project : UP Sodic Lands Reclamation Sector : Agriculture & Rural Devt Managing Division: AS4AG Appr. Date: Feb. 14, 1992 Board Date: Sep. 15, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: NA Total Project Cost: $145.00 Estimated Date for Receipt of EA by Bank: Country : INDIA Project ID No.: 41NDPA385 Project : Financial Intermediation/DFI Sector : Industrial Devel/Finance Managing Division: AS4CO Appr. Date: Dec. 27, 1991 Board Date: Mar. 17, 1992 Lending Instrument: Sector Adjustment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $400.00 Estimated Date for Receipt of EA by Bank: Country : INDIA Project ID No.: 41NDPA422 Project : ELECTRIC POWER SYSTEMS Sector : Power Managing Division: AS4EG Appr. Date: May 01, 1992 Board Date: Feb. 02, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $550.00 Estimated Date for Receipt of EA by Bank: 1-92 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : INDIA Project ID No.: 41NDPA435 Project : Karnataka Rural W.S. and Environmental Sanitation Sector : Water Supply and Sewerage Managing Division: AS4IN Appr. Date: Oct. 27, 1992 Board Date: Jul. 27, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $100.00 Estimated Date for Receipt of EA by Bank: 12/91 Country : INDIA Project ID No.: 41NDPA438 Project : Madras Water Supply and Sanitation II Sector : Water Supply and Sewerage Managing Division: AS4IN Appr. Date: Jun. 15, 1992 Board Date: Dec. 15, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $378.00 Estimated Date for Receipt of EA by Bank: Country : INDIA Project ID No.: 41NDPA442 Project : Steel Marketing Sector : Program Lending/SAL Managing Division: AS4CO Appr. Date: Sep. 27, 1991 Board Date: Dec. 05, 1991 Lending Instrument: Structural Adjustment Loan Status: Lending Date EA Category Assigned: TBD Total Project Cost: $500.00 Estimated Date for Receipt of EA by Bank: Country : INDIA Project ID No.: 41NDPA446 Project : SECAL II - Finance Sector : Industrial Devel/Finance Managing Division: AS4CO Appr. Date: Mar. 15, 1993 Board Date: Sep. 21, 1993 Lending Instrument: Sector Adjustment Loan Status: Lending Date EA Category Assigned: TBD Total Project Cost: $500.00 Estimated Date for Receipt of EA by Bank: Country : INDONESIA Project ID No.: 4INSPA159 Project : Treecrop Smallholder Development Sector : Agriculture & Rural Devt Managing Division: EA3AG Appr. Date: Sep. 29, 1988 Board Date: Mar. 24, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 11/30/91 Total Project Cost: $173.00 Estimated Date for Receipt of EA by Bank: 5/7/91 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : INDONESIA Project ID No.: 4INSPA189 Project : SEMARANG-SURAKARTA URBAN DEVELOPMENT Sector : Urbanization Managing Division: EA3IN Appr. Date: Nov. 01, 1992 Board Date: Jul. 13, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Prep.n Total Project Cost: $150.00 Estimated Date for Receipt of EA by Bank: Country : INDONESIA Project ID No.: 41NSPA250 Project : THIRD KABUPATEN ROADS Sector : Transportation Managing Division: EA3IN Appr. Date: JAN. 24, 1992 Board Date: Jun. 16, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 4th quarter 91 Total Project Cost: $350.00 Estimated Date for Receipt of EA by Bank: 11/17/91 Country : INDONESIA Project ID No.: 41NSPA286 Project : WATERSHED MANAGEMENT AND CONSERVATION Sector : Agriculture & Rural Devt Managing Division: EA3AG Appr. Date: Jun. 26, 1992 Board Date: Mar. 23, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $100.00 Estimated Date for Receipt of EA by Bank: October 29, 1990 Country : INDONESIA Project ID No.: 41NSPA298 Project : TELECOMMUNCATIONS Sector : Communications Managing Division: EA3IE Appr. Date: Dec. 04, 1991 Board Date: Jun. 02, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 4/91 Total Project Cost: $1,158.00 Estimated Date for Receipt of EA by Bank: 01/11/91 Country : INDONESIA Project ID No.: 41NSPA300 Project : Ground Water Development Sector : Agriculture & Rural Devt Managing Division: EA3AG Appr. Date: Jun. 22, 1992 Board Date: Dec. 29, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $90.00 Estimated Date for Receipt of EA by Bank: 2/25/91 I-94 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : INDONESIA Project ID No.: 4INSPA301 Project : Emerging Enterprises Development Sector : Industrial Devel/Finance Managing Division: EA3IE Appr. Date: May 01, 1991 Board Date: May 26, 1992 Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $305.00 Estimated Date for Receipt of EA by Bank: Country : KOREA Project ID No.: 4KORPA119 Project : PUSAN & TAEJON SEWERAGE Sector : Water Supply and Sewerage Managing Division: EAlIN Appr. Date: Jun. 21, 1991 Board Date: Apr. 14, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $130.00 Estimated Date for Receipt of EA by Bank: Country : KOREA Project ID No.: 4KORPA121 Project : RAILWAY SYSTEM MODERNIZATION Sector : Transportation Managing Division: EAlIN Appr. Date: Sep. 04, 1991 Board Date: Jul. 14, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $190.00 Estimated Date for Receipt of EA by Bank: Country : KOREA Project ID No.: 4KORPA167 Project : SEOUL SEWERAGE Sector : Water Supply and Sewerage Managing Division: EAlIN Appr. Date: Sep. 15, 1992 Board Date: Jul. 13, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: July 1992 Total Project Cost: $350.00 Estimated Date for Receipt of EA by Bank: Country : LAO, P.D.R. Project ID No.: 4LAOPAO20 Project : FOREST MANAGEMENT AND CONSERVATION Sector : Agriculture & Rural Devt Managing Division: EA1AG Appr. Date: Nov. 19, 1991 Board Date: May 12, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: TBD Total Project Cost: $21.50 Estimated Date for Receipt of EA by Bank: 10/31/91 1-95 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : MALAYSIA Project ID No.: 4MAYPA106 Project : THIRD FELCRA (Agriculture) Sector : Agriculture & Rural Devt Managing Division: EA1AG Appr. Date: Dec. 03, 1991 Board Date: Jun. 16, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $265.00 Estimated Date for Receipt of EA by Bank: 11/8/91 Country : MALDIVES Project ID No.: 4MLDPA006 Project : Fisheries III Sector : Agriculture & Rural Devt Managing Division: EA3AG Appr. Date: Apr. 19, 1991 Board Date: Dec. 20, 1991 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $30.50 Estimated Date for Receipt of EA by Bank: Country : NEPAL Project ID No.: 4NEPPAO62 Project : POWER SECTOR EFFICIENCY Sector : Power Managing Division: ASllE Appr. Date: Jun. 23, 1990 Board Date: Jan. 28, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $95.60 Estimated Date for Receipt of EA by Bank: Country : NEPAL Project ID No.: 4NEPPAO68 Project : IRRIGATION SECTOR PROJECT (ISP) Sector : Agriculture & Rural Devt Managing Division: AS1AG Appr. Date: Nov. 12, 1992 Board Date: Sep. 28, 1993 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: March 1993 Total Project Cost: $47.00 Estimated Date for Receipt of EA by Bank: 11/27/91 Country : NEPAL Project ID No.: 4NEPPAO93 Project : ROAD MAINTENANCE Sector : Transportation Managing Division: AS11N Appr. Date: Oct. 14, 1992 Board Date: Mar. 16, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $65.00 Estimated Date for Receipt of EA by Bank: new 1-96 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : NEPAL Project ID No.: 4NEPPAO95 Project : RURAL WATER SUPPLY & SANITATION Sector : Water Supply and Sewerage Managing Division:-ASIN Appr. Date: May 15, 1992 Board Date: Dec. 15, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 3/92 Total Project Cost: $22.00 Estimated Date for Receipt of EA by Bank: 7/90 Country : NEPAL Project ID No.: 4NEPPAO96 Project : SUNSARY MORANG II SUPPLEMENT Sector : Agriculture & Rural Devt Managing Division: AS1AG Appr. Date: Sep. 15, 1991 Board Date: Mar. 31, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $30.00 Estimated Date for Receipt of EA by Bank: Country : PAPUA NEW G. Project ID No.: 4PAPPA044 Project : ORO Small Holder Oil Palm Development Sector : Agriculture & Rural Devt Managing Division: EA3AG Appr. Date: Mar. 15, 1990 Board Date: Jun. 09, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $34.00 Estimated Date for Receipt of EA by Bank: 2/6/89 Country : PHILIPPINES Project ID No.: 4PHLPA151 Project : LAND REFORM SUPPORT Sector : Agriculture & Rural Devt Managing Division: EA1AG Appr. Date: Oct. 20, 1992 Board Date: Jun. 15, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $25.00 Estimated Date for Receipt of EA by Bank: 11/8/91 Country : PHILIPPINES Project ID No.: 4PHLPA187 Project : Municipal Development III Sector : Urbanization Managing Division: EAllN Appr. Date: Jun. 28, 1991 Board Date: Mar. 17, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $114.00 Estimated Date for Receipt of EA by Bank: 1-97 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : PHILIPPINES Project ID No.: 4PHLPA188 Project : Rural Infrastructure Project Sector : Urbanization Managing Division: EAlIN Appr. Date: Oct. 15, 1992 Board Date: Jul. 13, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $145.00 Estimated Date for Receipt of EA by Bank: Country : PHILIPPINES Project ID No.: 4PHLPA192 Project : HIGHWAY MANAGEMENT PROJECT Sector : Transportation Managing Division: EAlIN Appr. Date: Nov. 27, 1990 Board Date: Dec. 20, 1991 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: See actions Total Project Cost: $196.70 Estimated Date for Receipt of EA by Bank: Country : SOLOMON IS. Project ID No.: 4SLIPA015 Project : Housing Sector : Urbanization Managing Division: EA3IN Appr. Date: Aug. 15, 1992 Board Date: Jun. 01, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $7.00 Estimated Date for Receipt of EA by Bank: Country : SRI LANKA Project ID No.: 4SRIPA055 Project : TREE CROPS RESTRUCTURING Sector : Agriculture & Rural Devt Managing Division: AS1AG Appr. Date: Jun. 30, 1992 Board Date: Jan. 26, 1993 Lending Instrument: Sector Adjustment Loan Status: Lending Date EA Category Assigned: Under discussion Total Project Cost: $50.00 Estimated Date for Receipt of EA by Bank: Country : SRI LANKA Project ID No.: 4SRIPAO80 Project : TRANSPORT I Sector : Transportation Managing Division: ASIIN Appr. Date: Apr. 01, 1992 Board Date: Nov. 10, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $286.00 Estimated Date for Receipt of EA by Bank: 9/25/91 1-98 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : SRI LANKA Project ID No.: 4SRIPA081 Project : Rural Water Supply Sector : Water Supply and Sewerage Managing Division: ASlIN Appr. Date: JAN. 15, 1992 Board Date: Sep. 29, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $47.00 Estimated Date for Receipt of EA by Bank: Country : SRI LANKA Project ID No.: 4SRIPA082 Project : LOCAL GOVT. DEVELOPMENT Sector : Urbanization Managing Dviitoi AS1IN Appr. Date: Jun. 15, 1992 Board Date: Nov. 10, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: TBD Total Project Cost: $32.50 Estimated Date for Receipt of EA by Bank: 02/12/90 Country : SRI LANKA Project ID No.: 4SRIPA087 Project : Agricultural Support Services Sector : Agriculture & Rural Devt Managing Division: ASIAG Appr. Date: Jun. 28, 1991 Board Date: May 12, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $29.00 Estimated Date for Receipt of EA by Bank: Country : SRI LANKA Project ID No.: 4SRlPA097 Project : HIGHWAY MAINTENANCE PROJECT Sector : Transportation Managing Division: ASlIN Appr. Date: Dec. 01, 1992 Board Date: Jul. 13, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $150.00 Estimated Date for Receipt of EA by Bank: 11/91 Country : THAILAND Project ID No.: 4THLPA116 Project : PROVINCIAL WATER SUPPLY Sector : Water Supply and Sewerage Managing Division: EAlIN Appr. Date: Jun. 30, 1992 Board Date: Jun. 01, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $90.00 Estimated Date for Receipt of EA by Bank: 1-99 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : THAILAND Project ID No.: 4THLPA138 Project : FOURTH HIGHWAY SECTOR Sector : Transportation Managing Division: EAlIN Appr. Date: Sep. 10, 1991 Board Date: Mar. 31, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: TBD Total Project Cost: $174.00 Estimated Date for Receipt of EA by Bank: Country : VANUATU Project ID No.: 4VANPA013 Project : PETROLEUM EXPLORATION T.A. Sector : Energy Managing Division: EA3IE Appr. Date: Apr. 01, 1992 Board Date: Jun. 23, 1992 Lending Instrument: Technical Assistance Loan Status: Lending Date EA Category Assigned: Total Project Cost: $4.00 Estimated Date for Receipt of EA by Bank: 6/10/91 1-100 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : ALGERIA Project ID No.: 5ALGPA047 Project : LOCAL GOVERNMENT DEVELOPMENT Sector : Urbanization Managing Division: MN1IN Appr. Date: Nov. 14, 1992 Board Date: Jun. 15, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Total Project Cost: $100.00 Estimated Date for Receipt of EA by Bank: 11/12/91 Country : ALGERIA Project ID No.: 5ALGPA084 Project : CONSTRUCTION INDUSTRY Sector : Industry Managing Division: MN1IN Appr. Date: Feb. 20, 1992 Board Date: Sep. 08, 1992 Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: N/A Total Project Cost: $250.00 Estimated Date for Receipt of EA by Bank: 11/12/91 Country : ALGERIA Project ID No.: 5ALGPAO93 Project : CADASTRE Sector : Urbanization Managing Division: MNLIN Appr. Date: Nov. 09, 1991 Board,Date: Jun. 16, 1992 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Ongoing Total Project Cost: $91.00 Estimated Date for Receipt of EA by Bank: Country : ALGERIA Project ID No.: 5ALGPAO97 Project : IRRIGATION MANAGEMENT SUPPORT Sector : Agriculture & Rural Devt Managing Division: MN1AG Appr. Date: Oct. 15, 1992 Board Date: Jul. 01, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $50.00 Estimated Date for Receipt of EA by Bank: Country : BULGARIA Project ID No.: 5BULPA005 Project : Agricultural Development Sector : Agriculture & Rural Devt Managing Division: EM5PS Appr. Date: Feb. 13, 1992 Board Date: Aug. 11, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $110.00 Estimated Date for Receipt of EA by Bank: I-101 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : CZECHOS. Project ID No.: 5CZKPA009 Project : POWER & ENVIRONMENTAL IMPROVEMENT Sector : Energy Managing Division: EM4EE Appr. Date: Jun. 03, 1991 Board Date: May 24, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $200.00 Estimated Date for Receipt of EA by Bank: Country : EGYPT Project ID No.: 5EGTPA163 Project : TOURISM SECTOR RESTRUCTURING AND PRIVATIZATION Sector : Tourism Managing Division: MN2IN Appr. Date: Nov. 22, 1991 Board Date: Mar. 24, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $300.00 Estimated Date for Receipt of EA by Bank: Country : EGYPT Project ID No.: 5EGTPA165 Project : National Drainage Program Sector : Agriculture & Rural Devt Managing Division: MN2AG Appr. Date: Jun. 05, 1991 Board Date: Nov. 26, 1991 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $290.60 Estimated Date for Receipt of EA by Bank: Country : EGYPT Project ID No.: 5EGTPA170 Project : WEST NUBARIA INTENSIFICATION Sector : Agriculture & Rural Devt Managing Division: MN2AG Appr. Date: Sep. 12, 1992 Board Date: May 25, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Not required Total Project Cost: $175.00 Estimated Date for Receipt of EA by Bank: Country : EGYPT Project ID No.: 5EGTPA176 Project : AGRICULTURAL MODERNIZATION Sector : Agriculture & Rural Devt Managing Division: MN2AG Appr. Date: Aug. 01, 1992 Board Date: Jul. 15, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Not required Total Project Cost: $163.80 Estimated Date for Receipt of EA by Bank: 1-102 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : HUNGARY Project ID No.: 5HUNPA048 Project : PRODUCT MARKET DEVELOPMENT Sector : Agriculture & Rural Devt Managing Division: EM4AI Appr. Date: JAN. 04, 1992 Board Date: Jun. 11, 1992 Lending Instrument: Financial Intermediary Loan Status: Standby Date EA Category Assigned: Ongoing Total Project Cost: $230.00 Estimated Date for Receipt of EA by Bank: Country : IRAN Project ID No.: 51RNPA039 Project : FLOOD WORKS REHAB/TEHRAN DRAINAGE Sector : Urbanization Managing Division: MN2IN Appr. Date: Feb. 13, 1992 Board Date: Jun. 16, 1992 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Total Project Cost: $200.00 Estimated Date for Receipt of EA by Bank: Country : IRAN Project ID No.: 5IRNPA041 Project : POWER SECTOR EFFICIENCY Sector : Power Managing Division: MN2IE Appr. Date: JAN. 18, 1992 Board Date: Jun. 09, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $718.00 Estimated Date for Receipt of EA by Bank: 8/91 Country : IRAN Project ID No.: 5IRNPA046 Project : RAILWAY/POSTS Sector : Transportation Managing Division: MN2IN Appr. Date: Sep. 14, 1992 Board Date: Feb. 23, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Total Project Cost: $600.00 Estimated Date for Receipt of EA by Bank: Country : IRAN Project ID No.: 51RNPA049 Project : TEHRAN SOLID WASTE MANAGEMENT Sector : Water Supply and Sewerage Managing Division: MN2IN Appr. Date: JAN. 30, 1993 Board Date: Jul. 27, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Total Project Cost: $150.00 Estimated Date for Receipt of EA by Bank: 1-103 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : IRAN Project ID No.: 5IRNPA050 Project : TEHRAN SEWERAGE Sector : Water Supply and Sewerage Managing Division: 0N2IN Appr. Date: Aug. 17, 1992 Board Date: Jan. 26, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: February 1992 Total Project Cost: $100.00 Estimated Date for Receipt of EA by Bank: Nov. 18, 1991 Country : JORDAN Project ID No.: 5JORPA046 Project : TRANSPORT III Sector : Transportation Managing Division: MN2IN Appr. Date:.Dec. 01, 1991 Board Date: May 26, 1992 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Under Discussion Total Project Cost: $55.00 Estimated Date for Receipt of EA by Bank: Country : MOROCCO Project ID No.: 5MYCPA081 Project : MUNICIPAL FINANCE II Sector : Urbanization Managing Division: MN1IN Appr. Date: Feb. 14, 1992 Board Date: Jul. 01, 1993 Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $167.00 Estimated Date for Receipt of EA by Bank: 11/12/91 Country : MOROCCO Project ID No.: 5MYCPA114 Project : SECOND LSII Sector : Agriculture & Rural Devt Managing Division: MN1AG Appr. Date: Nov. 18, 1991 Board Date: Jul. 30, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 3rd Quarter,91 Total Project Cost: $160.00 Estimated Date for Receipt of EA by Bank: Country : MOROCCO Project ID No.: 5MYCPA152 Project : IRRIGATED AREAS AGRICULTURAL SERVICES PROJECT Sector : Agriculture & Rural Devt Managing Division: MN1AG Appr. Date: Oct. 01, 1992 Board Date: Jul. 06, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $40.00 Estimated Date for Receipt of EA by Bank: I-104 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : PAKISTAN Project ID No.: 5PAKPA214 Project : SINDH URBAN DEVELOPMENT Sector : Urbanization Managing Division: EMlIN Appr. Date: Jun. 22, 1991 Board Date: Sep. 15, 1992 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $175.00 Estimated Date for Receipt of EA by Bank: 5/18/90 Country : PAKISTAN Project ID No.: 5PAKPA218 Project : IRRIGATION/DRAINAGE I (Phase I) Sector : Agriculture & Rural Devt Managing Division: EMlAG Appr. Date: Jun. 25, 1991 Board Date: May 19, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $46.20 Estimated Date for Receipt of EA by Bank: Country : PAKISTAN Project ID No.: 5PAKPA223 Project : LOW INCOME COMMUNITIES INFRASTRUCTURE Sector : Urbanization Managing Division: EMlIN Appr. Date: Jul. 01, 1992 Board Date: May 15, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: 4th Quarter,90 Total Project Cost: $300.00 Estimated Date for Receipt of EA by Bank: Country : PAKISTAN Project ID No.: 5PAKPA232 Project : INT. HILL FARMING II Sector : Agriculture & Rural Devt Managing Division: EM1AG Appr. Date: Jun. 15, 1992 Board Date: Feb. 10, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Ongoing Total Project Cost: $69.60 Estimated Date for Receipt of EA by Bank: Country : PAKISTAN Project ID No.: 5PAKPA233 Project : POWER SECTOR DEVELOPMENT PROJECT (WAPDA X) Sector : Power Managing Division: EM1EG Appr. Date: JAN. 13, 1992 Board Date: Jun. 23, 1992 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Ongoing Total Project Cost: $150.00 Estimated Date for Receipt of EA by Bank: 1-105 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : POLAND Project ID No.: 5POLPA016 Project : INDUSTRIAL ENVIRONMENT I Sector : Energy Managing Division: EM4EE Appr. Date: Jun. 15, 1992 Board Date: Dec. 15, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $150.00 Estimated Date for Receipt of EA by Bank: Country : POLAND Project ID No.: 5POLPAO21 Project : PRIVATE SECTOR DEVELOPMENT Sector : Industrial Devel/Finance Managing Division: EM4AI Appr. Date: Jun. 28, 1991 Board Date: Apr. 11, 1992 Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: N/A Total Project Cost: $180.00 Estimated Date for Receipt of EA by Bank: 11/13/91 Country : POLAND Project ID No.: 5POLPA043 Project : COGENERATION PRIVATIZATION Sector : Energy Managing Division: EM4EE Appr. Date: Feb. 09, 1992 Board Date: Aug. 16, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $400.00 Estimated Date for Receipt of EA by Bank: Country : ROMANIA Project ID No.: 5ROMPAO81 Project : TRANSPORTATION Sector : Other Managing Division: EM5IV Appr. Date: Feb. 15, 1993 Board Date: Jun. 15, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Total Project Cost: $100.00 Estimated Date for Receipt of EA by Bank: Country : ROMANIA Project ID No.: 5ROMPA082 Project : PRIVATE FARMER SUPPORT Sector : Agriculture & Rural Devt Managing Division: EM5PS Appr. Date: JAN. 15, 1992 Board Date: Jun. 23, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $150.00 Estimated Date for Receipt of EA by Bank: 11/08/91 1-106 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : ROMANIA Project ID No.: 5ROMPA083 Project : FINANCIAL SYSTEM MOD. Sector : Industrial Devel/Finance Managing Division: EM5PS Appr. Date: Jul. 15, 1992 Board Date: Dec. 15, 1992 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Total Project Cost: $100.00 Estimated Date for Receipt of EA by Bank: Country : TUNISIA Project ID No.: 5TUNPAO96 Project : MUNICIPAL DEVELOPMENT Sector : Urbanization Managing Division: MNIN Appr. Date: Oct. 20, 1991 Board Date: Jul. 14, 1992 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Ongoing Total Project Cost: $250.00 Estimated Date for Receipt of EA by Bank: 11/12/91 Country : TUNISIA Project ID No.: 5TUNPA120 Project : INDUSTRIAL FINANCE Sector : Industrial Devel/Finance Managing Division: MNllE Appr. Date: Apr. 15, 1992 Board Date: Nov. 24, 1992 Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Total Project Cost: $250.00 Estimated Date for Receipt of EA by Bank: Country : TUNISIA Project ID No.: 5TUNPA130 Project : NATIONAL RURAL FINANCE Sector : Agriculture & Rural Devt Managing Division: MN1AG Appr. Date: Sep. 01, 1992 Board Date: Jul. 01, 1993 Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: 3rd Quarter, 92 Total Project Cost: $185.00 Estimated Date for Receipt of EA by Bank: Unchanged Country : TUNISIA Project ID No.: 5TUNPA131 Project : AGRICULTURAL SECTOR INVESTMENT LOAN Sector : Agriculture & Rural Devt Managing Division: MNIAG Appr. Date: Sep. 05, 1992 Board Date: Jul. 01, 1993 Lending Instrument: Sector Investment and Maintenance Status: Standby Date EA Category Assigned: TBD Total Project Cost: $200.00 Estimated Date for Receipt of EA by Bank: 1-107 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : TUNISIA Project ID No.: 5TUNPA134 Project : TRANSPORT SECTOR DEVELOPMENT Sector : Transportation Managing Division: MNIN Appr. Date: Sep. 01, 1992 Board Date: Jul. 06, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $150.00 Estimated Date for Receipt of EA by Bank: 11/13/91 Country : TUNISIA Project ID No.: 5TUNPA145 Project : Natural Gas Development Sector : Energy Managing Division: MN1IE Appr. Date: Mar. 11, 1991 Board Date: Nov. 26, 1991 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $98.60 Estimated Date for Receipt of EA by Bank: Country : TURKEY Project ID No.: 5TURPA152 Project : E. ANATOLIA WATERSHED REHABILITATION Sector : Agriculture & Rural Devt Managing Division: EM1AG Appr. Date: Jun. 15, 1992 Board Date: Feb. 15, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $230.00 Estimated Date for Receipt of EA by Bank: Country : TURKEY Project ID No.: 5TURPA184 Project : SOUTHWEST COAST ENVIRONMENT Sector : Water Supply and Sewerage Managing Division: EMlIN Appr. Date: Jun. 01, 1992 Board Date: Dec. 08, 1992 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Ongoing Total Project Cost: $150.00 Estimated Date for Receipt of EA by Bank: 1/11/90 Country : TURKEY Project ID No.: 5TURPA192 Project : FINANCIAL SECTOR INVESTMENT Sector : Industrial Devel/Finance Managing Division: EMlID Appr. Date: Nov. 15, 1992 Board Date: Jul. 15, 1993 Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $250.00 Estimated Date for Receipt of EA by Bank: 2/28/91 1-108 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : TURKEY Project ID No.: 5TURPAl94 Project : BURSA ENVIRONMENT Sector : Water Supply and Sewerage Managing Division: EMlIN Appr. Date: Mar. 16, 1992 Board Date: Sep. 08, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $250.00 Estimated Date for Receipt of EA by Bank: 8/21/90 Country : TURKEY Project ID No.: 5TURPA222 Project : ANTALYA ENVIRONMENT Sector : Water Supply and Sewerage Managing Division: EMlIN Appr. Date: Nov. 23, 1992 Board Date: Jul. 15, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Under discussion Total Project Cost: $350.00 Estimated Date for Receipt of EA by Bank: 9/91 Country : YEMEN Project ID No.: 5YARPA056 Project : TAIZ WATER SUPPLY & SEWERAGE REHAB. AND REINFORCEMENT Sector : Water Supply and Sewerage Managing Division: MN2IN Appr. Date: Apr. 20, 1992 Board Date: Oct. 13, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $30.00 Estimated Date for Receipt of EA by Bank: Dec. 18, 1991 Country : YEMEN Project ID No.: 5YEMPA012 Project : URBAN SERVICES DEVELOPMENT Sector : Water Supply and Sewerage Managing Division: MN2IN Appr. Date: Sep. 14, 1992 Board Date: Mar. 02, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $17.50 Estimated Date for Receipt of EA by Bank: Country : YEMEN Project ID No.: 5YEMPA013 Project : ENERGY/POWER Sector : Power Managing Division: MN2IE Appr. Date: Sep. 15, 1992 Board Date: Jul. 27, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: June 30, 1992 Total Project Cost: $40.00 Estimated Date for Receipt of EA by Bank: 10/15/90 1-109 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : YUGOSLAVIA Project ID No.: 5YUGPA157 Project : KVARNER\RIJEKA BAY AND ISTRIA COAST ENVIRONMENT Sector : Water Supply and Sewerage Managing Division: EM5IV Appr. Date: Mar. 11, 1991 Board Date: Mar. 31, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $440.00 Estimated Date for Receipt of EA by Bank: I-110 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : ARGENTINA Project ID No.: 6ARGPAO68 Project : Private Sector Development Credit Sector : Industrial Devel/Finance Managing Division: LA4TF Appr. Date: Aug. 15, 1992 Board Date: Aug. 15, 1993 Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Total Project Cost: $600.00 Estimated Date for Receipt of EA by Bank: 12/18/91 Country : ARGENTINA Project ID No.: 6ARGPA083 Project : Road Maintenance Sector : Transportation Managing Division: LA4IE Appr. Date: Apr. 20, 1992 Board Date: Oct. 06, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $1,060.00 Estimated Date for Receipt of EA by Bank: 11/13/91 Country : ARGENTINA Project ID No.: 6ARGPA112 Project : Hydrocarbon Engineering Sector : Energy Managing Division: LA4IE Appr. Date: Jun. 18, 1991 Board Date: Nov. 19, 1991 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $40.00 Estimated Date for Receipt of EA by Bank: Country : BARBADOS Project ID No.: 6BARPA016 Project : Road Maintenance & Rehabilitation II Sector : Transportation Managing Division: LA3IE Appr. Date: JAN. 13, 1992 Board Date: Jun. 16, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $20.00 Estimated Date for Receipt of EA by Bank: Country : BELIZE Project ID No.: 6BEZPA013 Project : PRIVATE SECTOR DEV. Sector : Industrial Devel/Finance Managing Division: .LA3TF Appr. Date: Jun. 15, 1992 Board Date: Mar. 15, 1993 Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Total Project Cost: $8.00 Estimated Date for Receipt of EA by Bank: I-111 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : BOLIVIA Project ID No.: 6BOLPA044 Project : AGRO. EXPORT DEVELOPMENT Sector : Agriculture & Rural Devt Managing Division: LA3AG Appr. Date: Mar. 31, 1991 Board Date: Dec. 17, 1991 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $39.70 Estimated Date for Receipt of EA by Bank: 9/22/88 Country : BOLIVIA Project ID No.: 6BOLPAO71 Project : Road Maintenance II Sector : Transportation Managing Division: LA3IE Appr. Date: Jun. 26, 1991 Board Date: Jun. 02, 1992 Lending Instrument: Sector Investment and Maintenance Status: Standby Date EA Category Assigned: Ongoing Total Project Cost: $250.00 Estimated Date for Receipt of EA by Bank: Country : BOLIVIA Project ID No.: 6BOLPA084 Project : MUNICIPAL DEV Sector : Urbanization Managing Division: LA3IE Appr. Date: JAN. 15, 1993 Board Date: Oct. 15, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Total Project Cost: $20.60 Estimated Date for Receipt of EA by Bank: Country : BRAZIL Project ID No.: 6BRAPA155 Project : Water Sector Modernization Sector : Water Supply and Sewerage Managing Division: LAlIN Appr. Date: Jun. 26, 1991 Board Date: Mar. 10, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $500.00 Estimated Date for Receipt of EA by Bank: 01/14/91 Country : BRAZIL Project ID No.: 6BRAPA165 Project : State Highways Management Sector : Transportation Managing Division: LAllN Appr. Date: Apr. 30, 1990 Board Date: Aug. 18, 1992 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $500.00 Estimated Date for Receipt of EA by Bank: 04/01/88 I-112 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : BRAZIL Project ID No.: 6BRAPA166 Project : Metro Transport CBTU - Sao Paolo Sector : Urbanization Managing Division: LAlIN Appr. Date: Jun. 29, 1991 Board Date: Jan. 28, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $281.00 Estimated Date for Receipt of EA by Bank: 11/21/90 Country : BRAZIL Project ID No.: 6BRAPA236 Project : Irrigation Subsector II Sector : Agriculture & Rural Devt Managing Division: LA1AG Appr. Date: May 15, 1992 Board Date: Feb. 15, 1993 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $450.00 Estimated Date for Receipt of EA by Bank: 11/7/89 Country : BRAZIL Project ID No.: 6BRAPA292 Project : Mato Grosso Natural Resources Management Sector : Agriculture & Rural Devt Managing Division: LALAG Appr. Date: Oct. 10, 1991 Board Date: Jul. 28, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $250.00 Estimated Date for Receipt of EA by Bank: 11/11/91 Country : BRAZIL Project ID No.: 6BRAPA299 Project : Environment II (CVRD) Sector : Other Managing Division: LA1EI Appr. Date: Feb. 20, 1992 Board Date: Sep. 22, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $360.00 Estimated Date for Receipt of EA by Bank: 11/07/91 Country : BRAZIL Project ID No.: 6BRAPA319 Project : Federal Highway Sector : Transportation Managing Division: LAllN Appr. Date: Jun. 15, 1992 Board Date: Dec. 15, 1992 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $1,000.00 Estimated Date for Receipt of EA by Bank: 1/24/92 1-113 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : BRAZIL Project ID No.: 6BRAPA325 Project : Infraero Reform Loan Sector : Transportation Managing Division: LAlIN Appr. Date: Sep. 15, 1992 Board Date: Feb. 15, 1993 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $300.00 Estimated Date for Receipt of EA by Bank: 02/05/92 IEPS DATE Country : CHILE Project ID No.: 6CHLPA060 Project : Small Farmer Services Sector : Agriculture & Rural Devt Managing Division: LA4AG Appr. Date: Sep. 30, 1991 Board Date: Mar. 17, 1992 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $236.00 Estimated Date for Receipt of EA by Bank: 8/8/90 Country : CHILE Project ID No.: 6CHLPA063 Project : Health Sector Reform Sector : Population Managing Division: LA4HR Appr. Date: May 15, 1992 Board Date: Sep. 15, 1992 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Total Project Cost: $450.00 Estimated Date for Receipt of EA by Bank: 7/26/90 Country : CHILE Project ID No.: 6CHLPA081 Project : Transport Infrastructure Sector : Transportation Managing Division: LA4IE Appr. Date: Jun. 24, 1991 Board Date: Dec. 17, 1991 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $170.00 Estimated Date for Receipt of EA by Bank: 7/30/90 Country : COLOMBIA Project ID No.: 6CLMPA191 Project : Export Development/Trade Reform Sector : Industrial Devel/Finance Managing Division: LA3TF Appr. Date: May 18, 1992 Board Date: Oct. 12, 1992 Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Total Project Cost: $200.00 Estimated Date for Receipt of EA by Bank: 11/20/90 1-114 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : COLOMBIA Project ID No.: 6CLMPA193 Project : Bogota Transport Sector : Urbanization Managing Division: LA3IE Appr. Date: Jun. 18, 1990 Board Date: Jan. 28, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $119.50 Estimated Date for Receipt of EA by Bank: Country : COLOMBIA Project ID No.: 6CLMPA194 Project : National Highway Sector III Sector : Transportation Managing Division: LA3IE Appr. Date: May 20, 1991 Board Date: Feb. 18, 1992 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $413.00 Estimated Date for Receipt of EA by Bank: Country : COLOMBIA Project ID No.: 6CLMPA195 Project : IFI-Restructuring & Divestiture Sector : Industrial Devel/Finance Managing Division: LA3TF Appr. Date: May 05, 1991 Board Date: Jan. 21, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $415.30 Estimated Date for Receipt of EA by Bank: 2/19/89 Country : COLOMBIA Project ID No.: 6CLMPA196 Project : Agriculture Sector Credit Sector : Agriculture & Rural Devt Managing Division: LA3AG Appr. Date: Feb. 03, 1992 Board Date: Sep. 15, 1992 Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $500.00 Estimated Date for Receipt of EA by Bank: 12/12/89 Country : COSTA RICA Project ID No.: 6COSPA047 Project : Water Supply Sector : Water Supply and Sewerage Managing Division: LA2IE Appr. Date: Apr. 15, 1992 Board Date: Dec. 01, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $40.00 Estimated Date for Receipt of EA by Bank: 11/20/91 1-115 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : COSTA RICA Project ID No.: 6COSPA049 Project : Agriculture Sector Investment Sector : Agriculture & Rural Devt Managing Division: LA2AG Appr. Date: Apr. 15, 1991 Board Date: Mar. 03, 1992 Lending Instrument: Financial Intermediary Loan Status: Standby Date EA Category Assigned: Completed Total Project Cost: $70.00 Estimated Date for Receipt of EA by Bank: Country : DOMINICAN R. Project ID No.: 6DOMPA043 Project : Coffee & Export Crops Development Sector : Agriculture & Rural Devt Managing Division: LA3AG Appr. Date: Nov. 20, 1989 Board Date: Jun. 30, 1992 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Completed Total Project Cost: $46.30 Estimated Date for Receipt of EA by Bank: 11/25/87 Country : ECUADOR Project ID No.: 6ECUPAO68 Project : Private Sector Development Sector : Industrial Devel/Finance Managing Division: LA4TF Appr. Date: Dec. 12, 1990 Board Date: Jul. 01, 1992 Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $100.00 Estimated Date for Receipt of EA by Bank: 8/7/90 Country : EL SALVADOR Project ID No.: 6ESLPA031 Project : Agriculture Sector Investment Sector : Agriculture & Rural Devt Managing Division: LA2AG Appr. Date: Sep. 30, 1991 Board Date: Jun. 16, 1992 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Total Project Cost: $45.00 Estimated Date for Receipt of EA by Bank: 11/14/90 Country : GUATEMALA Project ID No.: 6GUAPA042 Project : Social Investment Fund Sector : Population Managing Division: LA2HR Appr. Date: JAN. 28, 1990 Board Date: Jul. 07, 1992 Lending Instrument:t Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Completed Total Project Cost: $95.30 Estimated Date for Receipt of EA by Bank: 1/13/89 1-116 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : GUYANA Project ID No.: 6GUYPAO34 Project : ROAD RHB Sector : Transportation Managing Division: LA3IE Appr. Date: May 11, 1992 Board Date: Dec. 15, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $35.00 Estimated Date for Receipt of EA by Bank: 11/20/91 Country : GUYANA Project ID No.: 6GUYPAO35 Project : Private SEC CRD Sector : Industrial Devel/Finance Managing Division: LA3TF Appr. Date: Jul. 15, 1993 Board Date: Dec. 15, 1993 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Total Project Cost: $11.10 Estimated Date for Receipt of EA by Bank: Country : GUYANA Project ID No.: 6GUYPA036 Project : Sugar Industry Rehabilitation Sector : Agriculture & Rural Devt Managing Division: LA3AG Appr. Date: Feb. 14, 1992 Board Date: Sep. 15, 1992 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Total Project Cost: $100.00 Estimated Date for Receipt of EA by Bank: 2/15/91 Country : HAITI Project ID No.: 6HAIPA046 Project : Agric. Prod. & Land Development Sector : Agriculture & Rural Devt Managing Division: LA3AG Appr. Date: Feb. 27, 1993 Board Date: Dec. 15, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Completed Total Project Cost: $39.00 Estimated Date for Receipt of EA by Bank: Country : HAITI Project ID No.: 6HAIPAO54 Project : Private Sector Dev. Sector : Industrial Devel/Finance Managing Division: LA3TF Appr. Date: Oct. 30, 1992 Board Date: Jul.,15, 1993 Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Total Project Cost: $21.00 Estimated Date for Receipt of EA by Bank: 1-117 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : HONDURAS Project ID No.: 6HDSPA047 Project : Agriculture Sector Loan Sector : Agriculture & Rural Devt Managing Division: LA2AG Appr. Date: JAN. 20, 1992 Board Date: Jun. 09, 1992 Lending Instrument: Sector Adjustment Loan Status: Standby Date EA Category Assigned: Total Project Cost: $99.90 Estimated Date for Receipt of EA by Bank: 8/6/90 Country : HONDURAS Project ID No.: 6HDSPAO57 Project : Transport Sector Rehabilitation Sector : Transportation Managing Division: LA2IE Appr. Date: Jun. 15, 1992 Board Date: Jun. 15, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $41.50 Estimated Date for Receipt of EA by Bank: Country : JAMAICA Project ID No.: 6JAMPA069 Project : WTR SUPPLY & SWRGE Sector : Water Supply and Sewerage Managing Division: LA3IE Appr. Date: Oct. 15, 1992 Board Date: Jul. 15, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $55.00 Estimated Date for Receipt of EA by Bank: Country : JAMAICA Project ID No.: 6JAMPAO74 Project : Energy Sector Deregulation and Privatization Sector : Power Managing Division: LA3IE Appr. Date: JAN. 13, 1992 Board Date: Jun. 16, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $275.00 Estimated Date for Receipt of EA by Bank: Country : MEXICO Project ID No.: 6MXCPA149 Project : RAILWY SCTR Sector : Transportation Managing Division: LA2IE Appr. Date: Jun. 15, 1992 Board Date: Mar. 16, 1993 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Total Project Cost: $400.00 Estimated Date for Receipt of EA by Bank: 11/20/91 1-118 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : MEXICO Project ID No.: 6MXCPA152 Project : Urban Transport II Sector : Urbanization Managing Division: LA2IE Appr. Date: JAN. 30, 1992 Board Date: Jun. 16, 1992 Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Total Project Cost: $400.00 Estimated Date for Receipt of EA by Bank: Country : MEXICO Project ID No.: 6MXCPA168 Project : Power Sector I Sector : Power Managing Division: LA2IE Appr. Date: May 15, 1992 Board Date: Jan. 15, 1993 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $3,000.00 Estimated Date for Receipt of EA by Bank: 10/15/91 Country : MEXICO Project ID No.: 6MXCPA171 Project : Irrigation Sector (Rehabilitation) Sector : Agriculture & Rural Devt Managing Division: LA2AG Appr. Date: Feb. 19, 1991 Board Date: Dec. 03, 1991 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $1,250.00 Estimated Date for Receipt of EA by Bank: Country : MEXICO Project ID No.: 6MXCPA182 Project : Rural Financial Sector Sector : Agriculture & Rural Devt Managing Division: LA2AG Appr. Date: Feb. 17, 1992 Board Date: Jul. 14, 1992 Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $800.00 Estimated Date for Receipt of EA by Bank: 9/22/89 Country : MEXICO Project ID No.: 6MXCPA201 Project : HOUSING SCT Sector : Urbanization Managing Division: LA2IE Appr. Date: JAN. 30, 1992 Board Date: Jun. 30, 1992 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Total Project Cost: $400.00 Estimated Date for Receipt of EA by Bank: 3/15/91 1-119 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : MEXICO Project ID No.: 6MXCPA206 Project : .PRIV.SCTR.IRRIG Sector : Agriculture & Rural Devt Managing Division: LA2AG Appr. Date: Apr. 15, 1992 Board Date: Apr. 15, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $900.00 Estimated Date for Receipt of EA by Bank: Country : MEXICO Project ID No.: 6MXCPA227 Project : WATER RESOURCES TAL Sector : Technical Assistance Managing Division: LA2IE Appr. Date: Jun. 15, 1992 Board Date: Mar. 15, 1993 Lending Instrument: Technical Assistance Loan Status: Lending Date EA Category Assigned: Total Project Cost: $25.00 Estimated Date for Receipt of EA by Bank: 11/20/91 Country : NICARAGUA Project ID No.: 6NICPA046 Project : INFRASTRUCTURE Sector : Transportation Managing Division: LA2IE Appr. Date: Oct. 15, 1992 -Board Date: Jul. 30, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $25.60 Estimated Date for Receipt of EA by Bank: 11/20/91 Country : PANAMA Project ID No.: 6PANPAO53 Project : PERL Sector : Industrial Devel/Finance Managing Division: LA2C2 .Appr. Date: Jul. 15, 1992 Board Date: Jul. 13, 1993 Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Total Project Cost: $50.00 Estimated Date for Receipt of EA by Bank: Country : PARAGUAY Project ID No.: 6PARPA066 Project : Transport Sector : Transportation Managing Division: LA4IE Appr. Date: May 17, 1992 Board Date: Nov. 03, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $105.00 Estimated Date for Receipt of EA by Bank: 1/30/90 1-120 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : PARAGUAY Project ID No.: 6PARPAO70 Project : Private Sector Development Sector : Industrial Devel/Finance Managing Division: LA4TF Appr. Date: Nov. 25, 1991 Board Date: Jul. 15, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $128.40 Estimated Date for Receipt of EA by Bank: 2/14/90 Country : PARAGUAY Project ID No.: 6PARPAO73 Project : Water Supply Sector : Water Supply and Sewerage Managing Division: LA4IE Appr. Date: Feb. 17, 1992 Board Date: Oct. 15, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $24.50 Estimated Date for Receipt of EA by Bank: 6/27/91 Country : PERU Project ID No.: 6PERPA17 Project : INFRA RHB Sector : Urbanization Managing Division: LAlIN Appr. Date: Jul. 01, 1992 Board Date: Jan. 26, 1993 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Total Project Cost: $275.00 Estimated Date for Receipt of EA by Bank: 12/16/91 Country : PERU Project ID No.: 6PERPAl23 Project : WATER REHAB. Sector : Water Supply and Sewerage Managing Division: LAlIN Appr. Date: Oct. 12, 1992 Board Date: May 18, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $200.00 Estimated Date for Receipt of EA by Bank: 12/17/92 IEPS DATE Country : TRINIDAD & T Project ID No.: 6TRIPAO24 Project : Business Expansion and Industrial Restructuring Sector : Industrial Devel/Finance Managing Division: LA3TF Appr. Date: Jun. 10, 1991 Board Date: Dec. 19, 1991 Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $49.60 Estimated Date for Receipt of EA by Bank: 8/10/90 1-121 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : VENEZUELA Project ID No.: 6VENPAO30 Project : Power Sector Investment I Sector : Power Managing Division: LAIEI Appr. Date: Jun. 22, 1992 Board Date: Mar. 09, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under discussion Total Project Cost: $660.00 Estimated Date for Receipt of EA by Bank: 9/17/91 Country : VENEZUELA Project ID No.: 6VENPAO31 Project : Urban Transport I Sector : Urbanization Managing Division: LAIN Appr. Date: May 15, 1992 Board Date: Feb. 15, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Total Project Cost: $300.00 Estimated Date for Receipt of EA by Bank: 11/02/90 Country : VENEZUELA Project ID No.: 6VENPAO33 Project : Barrio Upgrading Sector : Urbanization Managing Division: LAlIN Appr. Date: Dec. 09, 1991 Board Date: May 19, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under Discussion Total Project Cost: $70.00 Estimated Date for Receipt of EA by Bank: 09/21/89 Country : VENEZUELA Project ID No.: 6VENPAO35 Project : Agriculture Sector Investment Sector : Agriculture & Rural Devt Managing Division: LA1AG Appr. Date: Jun. 29, 1990 Board Date: Dec. 03, 1991 Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Ongoing Total Project Cost: $900.00 Estimated Date for Receipt of EA by Bank: Country : VENEZUELA Project ID No.: 6VENPA040 Project : Caracas Water Sector : Water Supply and Sewerage Managing Division: LAlIN Appr. Date: May 07, 1992 Board Date: Sep. 29, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under discuss. Total Project Cost: $225.00 Estimated Date for Receipt of EA by Bank: 09/12/90 1-122 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : VENEZUELA Project ID No.: 6VENPA044 Project : Highway Management Sector : Transportation Managing Division: LAlIN Appr. Date: Apr. 06, 1992 Board Date: Oct. 15, 1992 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Ongoing Ongoing Total Project Cost: $330.00 Estimated Date for Receipt of EA by Bank:, 11/15/91 Country : VENEZUELA Project ID No.: 6VENPA048 Project : Endemic Disease Control Sector : Population Managing Division: LA1HR Appr. Date: Jun. 15, 1992 Board Date: Jan. 15, 1993 Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Under discuss. Total Project Cost: $80.00 Estimated Date for Receipt of EA by Bank: 11/07/91 ANNEX II GLOBAL ENVIRONMENT FACILITY - QUARTERLY REPORT ON INVESTMENT PROJECTS The Global Environment Trust Fund (GET) under the framework of the Global Environment Facility (GEF) was established in the Bank on March 14, 1991 to assist developing countries by way of grants and concessional financing in carrying out programs to protect the global environment. The GEF is a three-year pilot program designed to demonstrate cost-effective, innovative technologies or approaches to mitigate selected global environmental problems. It has four objectives for the operations of the Facility: a) reducing and limiting emission of greenhouse gases which cause global warming; b) preserving the earth's biological diversity and maintaining natural habitats; c) arresting the pollution of international waters; and d) protecting the ozone layer from further depletion. However, projects to reduce emissions of ozone depleting substances will largely be funded from the Bank's Ozone Layer Protection Trust Fund which receives funds from the Interim Multilateral Fund under the Montreal Protocol. GEF is a cooperative venture among national governments, the World Bank (for investment projects), the United Nations Development Programme-UNDP (for pre-investment studies and technical assistance), and the United Nations Environment Programme-UNEP (for scientific and technical advice). Further, the Bank has been asked to administer the program funded by GET, and in its capacity as Trustee, the Bank is also authorized to enter into Cofinancing Arrangements with potential cofinanciers. This quarterly Annex provides information on investment projects that have been reviewed by the GEF Participants (Donors) and have been approved for further processing by the Bank, as well as investment projects that are in the project pipeline to be presented for review at subsequent GEF Participants' meetings. s s 1 GLOBAL ENVIRONMENT FACILITY ANNEX 11-1 QUARTERLY REPORT ON INVESTMENT PROJECTS (As of December 15, 1991) Country/ Amount ($m) GEF Proj GEP Implementing & Probable (ree-standing Objective & Coassuting Stage of Processing * and Agency Lender Associated Bank Prolect) Project Description Services Action on Procurement AFRICA CAMEROON 5.0 Tropical Forest Blodiversity To be determined Project Pipeline (GEF) (Ecological Protection) Development of land use plans for priority areas; execution of fanal and floral surveys; and development and implementation of management plans of reserves. CONGO 10 Congo Wildlands Proteetion Biodiversity Consulting services Work Program Mi. of Planning (GEF) and Management Preservation of several unique co. will be required Project preparation underway. & Economy (Proo standing project) systems through institutional support. Preparation studies to inventories of reserves and managemnt be financed by GEP/Bank plans, technical assistance and studies. GHANA 10.0 Coastal Ecosystems Blodiversity To be determined Work Program Env.Protection (GE) (Environmental Resources Management of five coastal wetlands; Preappraisal mission in Council 20.0 Management) survey and demarcation of site boundaries the field. Possible cofinancing (DA) and development of managnement plan by ODA/UNSO studies; identification of development options; establishment of investment funds; training and education KENYA 6.2 Tas River Primates Blodiversity To be determined Work Program Mm. of Wildlife (GD) (Support for Wildlife Establishing effective management Project under preparation & Tourism 60.0 Management) of the Reserve and reducing Pre-investment study of $520,000 (DA) reliance by local community on has been requested from UNDP. resources of the Reserve. MALAWI 4.0 Lake Malawi Conservation Blodiversily To be derermined Project Pipeline (GEF) of Biodiversity Artisnal fisherman training and (To be determined) biodiversity management, public awareness. riparian state, institutional building MAURITIUS 3.3 Sugar Energy Biotechnology Global Warming Consulting Services Work Program Mauritius Sugar (GEF) (Bagse Energy Dey. Proj.) Sugar-mill energy efficiency will be required. Negotiations scheduled for Authority 10.0 improvements; trials and experiments January 1992 (Bank) on harvesting, handling. storage, and combustion for cane field trash and cane tops; technical assistance and studies; reduction of greenhouse gas emissions. NIGERIA 30.0 Gas Flaring Reduction Global Warming To be determined Project Pipeline (GED) (Power VIII/Env. TA) Reduction of greenhouse gases through gas flare reduction, energy efficiency and conservation. SEYCHELLES 1.8 Blodiversity Conservation Blodiversity To be determined Work Program Dept. of (GEF) Abatement of Marine Pollution Protection of endangered sea turtles; Project under preparation Environment 10.0 (Inhastructure and Environment) retoration of ecosystem of Aldabra world (Bank) heritage site; long tem management pas. Abatement of marine pollution. Design of facilities and strengthening of capacity to treat waste from ships; technical assistance; application of cost recovery methods. UGANDA 4.0 Dwinedi Forest Gorilla Reserve Biodliversity To be determined Work Program TO be (GE) (Pros standing project) Conservation of biological diversity Project under preparation detmined 30.0 and natural forest ecosystems. Pie-investmnt study of 3151,000 (Otbes) including strengthening Governments has been requested from UNDP. capacity to protect and manage protected areas. ZAIRE 4.0 Blodliversity Protection Blodiversily To be determined Project Pipeline (GEF) (Porostry & Environment) Improve management of protected areas; Major delays incured due to explore altenative forest management systems; political situation promote agroforestry and natural rosource management; strengthen national capacity for policy analysis. env. asssmont and research; training. GLOBAL ENVIRONMENT FACILITY ANNI QUARTERLY REPORT ON INVESTMENT PROJECTS (As of December 15, 199 1) Country/ Amount ($m) GEF Proj GEF Implementing & Probable (Free-standial Objective & Consulting Stage of Processng 0and Anency Lender Associated Bank Projeco) Project Description Services Action on Procurement ASIA RUrAN 10.0 Trust Fund for Env. Coaservation Blodiversity To be determined Work Program (GEF) (Free standing project) Management planning and MOD under preparation institutional strengthmning, training and surveys CHINA 30.0 Marine Pollution International Water Pollution To be determined Work Program Six ports (GEF) (Ships Wsstes Disposal Project) Pollution reduction through Appraisal Report under preparation; authorities 15.0 modernizing facilities at six potts Board presentation of associated Bank (IDA) for hundling oil and other wastes, project scheduled for March 17, 1992. CHINA 20.0 Blodiversity Action Plan Blodiversity To be determined Project Pipeline Min. of Forestry (GEF) (Forestry Sector 11) Bindiversity conservation action plan. Project under preparation 100.0 investment identification and preparation (Bank) education and training 200.0 (DA) INDIA 30.0 Noa-Convendonal Energy Proj. Global Warming To he determined Work Program MWEA (GEF) (Renewable Energy Dcv.Prqj.) Reduction in global warming. PV and Project under preparation. 100.0 windpower technologies Appraisal in March 1992. Bilateral 120.0 (Bank) C ONESIA 12O. Bodnversity Acion Pln BlodPverroty To he determined Project Pipeine To he determined (GE ) (Watershed Conservation Management plan preparation, fauna Project under preparation 50.0 and Management) and floral surveys, institutional reform (Bank) LAO PDR Ts Wildlife & Protected Areas MgmL Blodiversity To be determined Work Program (GEF) (National Forest)y Management Protected arms syntem development Yellow cover report to he 10.0 and Conservation) and management training; environmental completed by Januaty 30. 1992. (IDA) monitoring and evaluation and community participation in conservation programs PHILIPPINES 30.0 Geothermal Energy Developme It Global Warming To be-determined Work Program Nafi Power Corp. (GEF) (Shpte Geothermal Project) C02 avoidance through replacement Project under preparation Phil. Niel Oil Corp. 365.0 of coalbased power plant with (Bank) geothermal energy PHILIPPINES 20.0 Coduersaion of Priority Biodiversity To be determined Work ro gram De of Env. (GEF) Protected Areas Implmentation of the Integrated Bank SECAL approved dr N1. Resources 00.o (Evironment and Natural Protected Ares System to preserve and onJune21.1991. GE1 (Bank) Resources Sector Adj. Prog.) rehabilitate forests, coral reefs, and component to he appraised 66.0 wetlands. in Fe%ruary 1992 (IDA) THAI AN 15.0 Promotion of Elecrgcity Global Warming To be determined Work Program (GEF) Energy Efficiency Energy ngduse efficiency Project under preparation. 10.0 (Distribntion System Bilateral Development Project) 30.0 (Bank) GLOBAL ENVIRONMENT FACMY ANNEX 11-3 QUARTERLY REPORT ON INVESTMENT PROJECTS (As of December 15. 1991) Country/ Amount (Sm) GEF ProjGE ImplemeaUng & Probable (Fweestandlng/ Objective & Consigng Stage of Processing * and en Leader Associated Bank Project) Projec Descrloo Services Actles on Procerement EMENA ALGERIA 10.0 El Kala Nadeinal Park Blodiveralty To be detemined Work Program (GEF) (Proo standing project) Ramar she wetlands conservation. Project under proparation andangered species, migratory bhds. deer. archeology BYELORUSSIA L0 Fored Blodiversily Blodiversity To be determined Work Program (GEF) (Pres standing project) Unique forest species, rolo stands, air Project under preparation pollution threat. gene banks. preervation CEECHOSLOVAIGA 4.3 Planning and Management of Blodiversity To be determined Work Program (GEF) Casch and Slovak Reserves Establishing and financing sustainable Appraisal scheduled for 150.0 (Environment I) network of protected armes: "Ecological March 23.1992 (Bank) Bank of Europe" program MEDITERRANEAN 20.0 Ports Wate Disposal laternatlonal Waters To be detrmined Project Pipelae Regional Sea (GEF) (Algeda.TLird Ports Project, Port waste reception, oea pollution, To be presented to Polladon Proj. Morocco-Ports Sector; oil waste deballesting GBPPrticipents in April Algeria Tunisia-Trans. Sector 1992 Morocco Developmst Project) Toali POLAND 25.0 Coal-to-Gas Conversion Global Warming To be detemined Work Program District Hes (GEF) (Heat Supply Restructuring Energy efficiency, natural gas. Appraisal scheduled for Cosporation 340.0 and Conservation) small scale industry, household energy April 20,1992 (Bank) LAC BRAZIL 30.0 National Conservation Unit Blodiversity To be determined Work Program IMAMA (GE) (National Environmat) Conservation units, megadiversity Preappraisal mission scheduled forPetarusry 1992 BRAZIL 23.0 BIlomass GaslfcallloadGas Tarbine Global Warming To be determined Project Pipelie (GEF) Cro be detemined) Gasification of low value residues and energy crops for high officiency electrichy generation ECUADOR 5.0 Blodlversty Protection Blodiversilty To bo da amined Project Pipcinae (GEF) CTA for Environmental Mgmt) Technical assistance and training for preparation and execution of management plan for seven conservation unks JAMAICA 5.0 Demand Side Management Global Warming To be deermined Project Pipeline (GE) (Prae standing project) Carbon sequestration, biomass power. and Privatization integrated demand management MEXICO 30.0 Blodiversily Conservation Blodiversity To be determined Work Program SEDUB (GEF) (Environment) Megadiversity. protected arms Appraisal of GEP component 50.0 to be completed in December 1991. (Bank) Board presentation of associated Bank project scheduled for March 3, 1992. MEXICO 30.0 High EffMdieacy Lighting Pgol Global Warming To be determined Work Program (GE) (PowerSectrProject) Demonstration of energy efficient Project under preparation 10.0 lighting technologies and organizational (CFE) development for pogram delivey 450.0 and marketing techniques. (Bank) PERU 4.0 Nanonal Parks (Blodlv.ProL) Blodiversity To be dctermined Work Program Min. ofAgr. (GEF) ( *re* standing project) Endemism, sustainable protection. Appraisal scheduled for endangered species. tust fund late Pebruary 1992. *Classifleation of GF projects based on processing status: a) Projest in GHP Work Program ae those that have been presented for review by Participants at smual meetings of the OEP and have been retained for fAuthor processing and apprealea. b) Projects in G8 Pipeline are those projects which have passed the three critical hurdles to be included in the GEP Program bmt are not scheduled for approval before the next semiannual mesling of Participants sad have not bon presented to the Partispants for their review. The three hurdies ae Governmeals formal request for the project. passing ataemical review, and cloarnce for eligibility by the GBP implementation Committee. PIrjects in this category are necessaily less certain in terms ofrcotent and cts than these in the GE Work Program.