THE UNITED REPUBLIC OF TANZANIA President Office TANZANIA SOCIAL ACTION FUND Production Social Safety Net - II (PSSN II) ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK Final Prepared by: TASAF Management Unit PSPF Tower, 4th Floor Jakaya Mrisho Kikwete Street P. O. Box 2719 Dodoma Tel: +255 2629 63866 Fax: +255 2629 63871 E mail: info@tasaf.org Website: www.tasaf.org APRIL 2019 LIST OF ABBREVIATIONS AND ACRONYMS CAP - Chapter CBO - Community Based Organization CDD Chap - Community Driven Development CMC ter - Community Management Committee CMCs - Community Management Committee CMCs COMSIP - Community Savings and Investment Promotion DED - - District Executive Director DEMO - District Environmental Management Officer DFID Com - Department for International Development DoE munity - Division of Environment DOEZ - Department of Environment Zanzibar Management DP - Displaced People/Development Partner EA Committee - Environmental Assessment ECD - Early Childhood Development COMSIP EIA - Environmental Impact Assessment EIAR - - Environmental Impact Assessment Report EIS - Environmental Impact Statement EM - Environmental Monitoring EMA DFID - Environmental Management Act 2004 EMO - Environmental Management Officer ER - - Environmental Review ES Depa - Environmental Screening ESA - Environmental and Social Assessment ESMF for - rtment Environmental and Social Management Framework FI Internationa - Financial Intermediary GDP - Gross Domestic Product l GBV - Gender Based Violence GN Development - Government Notice GoT - Government of Tanzania DP GoZ - Government of Zanzibar GRM - - Grievance Redress Mechanism HBS - Household Budget Survey HIV/AIDDispl - Human inefficient Virus/Acquired immune deficiency Syndrome ID aced - Identification IDA - International Development Association People/Devel IGA - Income Generating Activity IRF opment - Involuntary/Resettlement Framework LAT - Land Tenure Act Partner LEA - Limited Environmental Assessment LGAs EA - Local Government Authorities LGSP - Local Government Support Programme M&E - - Monitoring and Evaluation MDGs Envir - Millennium Development Goals MEP - Monitoring and Evaluation Plan. onmental MKUZA - Mkakati wa Kukuza Uchumi Zanzibar MLHHSD Assessment - Ministry of Land, Housing and Human Settlement Development MSLSD - Ministry of State, Local Government and Special Department ECD MT - Metric Tons - i Early Childhood Development NEMC - National Environment Management Council NEP - National Environmental Policy NFDA - National Food and Drug Authority NGO - Non-Governmental Organizations NPSNP - National Productive Safety Net Program NSC - National Steering Committee NVF - National Village Fund OD - Operational Directive OM - Operational Manual OP - Operational Policy PAAs - Project Area Authorities PAPs - Project Affected Persons PCDP - Public Consultation and Disclosures Procedures PDO - Project Development Objective PEA - Preliminary Environmental Impact Assessment PO-RALG - President’ Office Regional Administration and Local Government PPA - Participatory Poverty Assessment PPT - Project Preparation Team PRS - Poverty Reduction Strategy PRSP - Poverty Reduction Strategy Paper PSSN - Productive Social Safety Net PWP - Public Works Program LAP - Land Acquisition Plan RAS - Regional Administrative Secretary RCDAP - Reconciliation, Discloser Action Plan LPF - Land Acquisition Policy Framework SEA - Socio Economic Assessment TASAF - Tanzania Social Action Fund TBS - Tanzania Bureau of Standards TMU - TASAF Management Unit TNA - Training Needs Assessment TOR - Terms of Reference TOT - Training of Trainers TPRI - Tropical Pesticides Research Institute URT - United Republic of Tanzania VDP - Village Development Plan VFC - Village Fund Coordinator VIC - Veterinary Investigation Center VPO-DOE - Vice President Office – Division of Environment WB - World Bank WEO - Ward Executive Officer WFP - World Food Program ii Table of Contents LIST OF ABBREVIATIONS AND ACRONYMS ...............................................................................................i DEFINITIONS ..................................................................................................................................................... x CHAPTER ONE: BACKGROUND AND PROJECT DESCRIPTION ............................................................... 1 1.1 Background ................................................................................................................................................ 1 1.2 Baseline Data ............................................................................................................................................. 1 1.2.1 Geographical location ................................................................................................1 1.2.2 Major Geographical Features ....................................................................................1 1.2.3 Economy ....................................................................................................................2 1.2.4 Weather ......................................................................................................................2 1.2.5 Population ..................................................................................................................3 1.3 Description of the Project .......................................................................................................................... 3 1.3.1 Component 1: Productive Household Support: .........................................................4 1.3.2 Component 2: Institutional strengthening and integrated delivery systems .............6 CHAPTER 2: ASSESMENT AND MANAGEMENT OF ENVIRONMENTAL AND SOCIAL RISKS AND IMPACTS ............................................................................................................................................... 8 2.1 Objectives of the ESMF .......................................................................................................................... 10 2.2 Potential Users of this ESMF .................................................................................................................. 10 2.3 Institutional Arrangements ...................................................................................................................... 11 CHAPTER 3: OVERVIEW OF POLICIES, LEGISLATION AND INSTITUTIONAL ARRANGEMENTS . 13 3.3.1 National Land Policy (1995) ...................................................................................13 3.3.2 Agriculture and Livestock Policy (1997) ................................................................14 3.3.3 National Forestry Policy, 1998 ................................................................................14 3.3.4 National Human Settlement Policy (2000) ..............................................................14 3.3.5 Environmental Legislation: .....................................................................................15 3.4 World Bank Environmental and Social Framework .............................................................................. 15 3.5 Environmental Institutional Arrangements: ........................................................................................... 18 3.6 Linkage of PSSN II on Policies, Legislation and Institutional Arrangement ....................................... 20 3.7 Environmental Assessment Process and Procedures ............................................................................. 21 3.7.1 EIA Procedure in the Program .................................................................................21 3.7.2 Steps toward Environmental and Social Management under ESS1 ........................21 3.8 Potential Environmental and Social Risk and Impact ............................................................................ 23 3.8.1 Overall Environmental and Social impacts .............................................................24 3.8.2 Potential Positive Impacts........................................................................................24 3.8.3 Potential Adverse Impacts .......................................................................................26 3.8.4 Localized Negative Impacts ....................................................................................27 3.8.5 Cumulative Impacts .................................................................................................28 3.8.6 Strategic Impacts .....................................................................................................28 3.8.7 Other Social and Environmental Degradation Issues ..............................................29 3.9 Training and Capacity Building .............................................................................................................. 30 3.9.1 Training at PAA level ..............................................................................................31 3.9.2 Budget for Mainstreaming, Capacity Building and Training ..................................31 3.10 Monitoring and Evaluation of ESMF ..................................................................................................... 31 3.10.1 Monitoring and Evaluation Indicators .....................................................................32 3.10.2 Monitoring Roles and Responsibilities....................................................................32 CHAPTER 4: LABOUR AND WORKING CONDITIONS .............................................................................. 35 4.1 Introduction .............................................................................................................................................. 35 4.2 Objective .................................................................................................................................................. 35 4.3 Rationale for Labour and Working Conditions (LWC) Procedures ...................................................... 35 4.4 Scope of application ................................................................................................................................ 36 4.5 Working Conditions and Management of Worker Relationships ......................................................... 36 4.5.1 Labour Management Procedure ...............................................................................36 4.5.2 Terms and conditions of engagement ......................................................................37 4.5.3 Grievance Redress Mechanism (GRM): ..................................................................37 4.5.4 Occupational Health and Safety (OHS): ..................................................................37 iii 4.5.5 Duty allocations – women, elderly, people with disability, pregnant women .........38 4.5.6 Institutional arrangement: ........................................................................................38 4.5.7 Risk Assessment: .....................................................................................................39 4.5.8 Mitigation: ...............................................................................................................39 4.5.9 Monitoring: ..............................................................................................................39 4.5.10 Budgets and Costs Estimate: ...................................................................................39 CHAPTER 5: CULTURAL HERITAGE PROTECTION PLAN ...................................................................... 40 5.1 Introduction .............................................................................................................................................. 40 5.2 Policies and legal frameworks ................................................................................................................ 40 5.3 Objective of addressing Cultural Heritage Issues .................................................................................. 41 5.4 Key areas of focus ................................................................................................................................... 41 5.5 Ngorongoro Conservation Area (1979) .................................................................................................. 41 5.6 Serengeti National Park (1981) ............................................................................................................... 41 5.7 Ruins of Kilwa Kisiwani and Ruins of Songo Mnara (1981) ................................................................ 41 5.7.1 Selous Game Reserve (1982)...................................................................................42 5.7.2 Kilimanjaro National Park (1987) ...........................................................................42 5.7.3 Stone Town of Zanzibar (2000) ...............................................................................42 5.7.4 Kondoa Rock Art Sites (2007) ................................................................................42 5.7.5 Potential adverse Impacts on Culture Heritage of communities .............................43 5.8 Cultural Heritage Management and Monitoring Plan ............................................................................ 43 CHAPTER 6: STAKEHOLDER ENGAGEMENT PLAN AND INFORMATION DISCLOSURE ................ 45 6.1 Introduction .............................................................................................................................................. 45 6.2 Stakeholders identification and analysis ................................................................................................. 46 6.2.1 Affected parties ........................................................................................................46 6.2.2 Other interested parties ............................................................................................46 6.2.3 Vulnerable Groups ...................................................................................................46 6.2.4 Summary of project stakeholder needs ....................................................................46 6.2.5 Stakeholders Engagement Plan................................................................................47 6.2.6 Purpose and timing of stakeholder engagement program........................................48 6.2.7 Proposed strategy for information disclosure ..........................................................48 6.3 Proposed strategy for consultation .......................................................................................................... 48 6.3.1 Proposed strategy to incorporate the view of vulnerable groups .............................49 6.3.2 Timelines .................................................................................................................49 6.3.3 Review of Comments ..............................................................................................49 6.4 Resources and Responsibilities for implementing stakeholder engagement activities ........................ 49 6.4.1 Human Resources ....................................................................................................49 6.4.2 Management functions and responsibilities.............................................................50 6.4.2.1 Village and Ward levels………………………………………………………………………………50 6.4.2.2 PAA and regional levels………………………………………………………………………………50 6.4.2.3 National Level……………………………………………………………………………………….. 51 6.5 Monitoring and Reporting …………………………………………………………………………… 51 6.5.1 Involvement of stakeholders in monitoring activities .............................................51 6.5.1 Reporting back to stakeholder groups .....................................................................51 CHAPTER 7: GRIEVANCE REDRESS MECHANISM .................................................................................. 52 7.1 Introduction .............................................................................................................................................. 52 7.2 The procedure of grievance redress ........................................................................................................ 53 7.2.1 Environmental and social issues ................................................................................54 7.2.2. Vulnerable group issues ............................................................................................54 7.2.3. Other Vulnerable Groups ..........................................................................................54 CHAPTER 8: CAPACITY BUILDING FOR ESMF ......................................................................................... 56 8.1 Introduction .............................................................................................................................................. 56 8.2 Capacity building at different levels ....................................................................................................... 56 8.3 Budget for Capacity Building in Environmental and Social Frameworks ............................................ 57 ANNEXES .......................................................................................................................................................... 58 Annex 1: Brief description on the nature and estimated cost for major types of subprojects ............................. 58 Annex 2: List of Projects requiring EIA based on EMA, 2004 (Mandatory, but not applicable to PSSN II) ..... 61 iv Annex 3: List of small-scale activities and enterprises that require registration (some may be applicable to PSSN II) .......................................................................................................................................................... 67 Annex 4: Fomu ya Kutambua Aina ya Mradi na Ushirikishwaji wa Jamii ........................................................ 70 Annex 5 Tathmini Ndogo Ya Athari Kwa Mazingira Na Kijamii (TAM) ......................................................... 73 Annex 6 Sample Matrix of Environmental and Social Management Plan (ESMP) ............................................ 74 Annex 7 Environmental Checklist based on Subprojects Sectors ....................................................................... 77 Annex 8 Subproject Safeguards Reporting Format ............................................................................................ 86 Annex 11 Risk Assessment and Severity Index Matrices ................................................................................... 88 Annex 12: Stakeholder Engagement Plan ........................................................................................................... 90 Annex 13: Grievance Reporting Form ................................................................................................................ 92 Annex 14: Sample Grievance Resolution Form.................................................................................................. 93 Annex 15: Capacity building plan ...................................................................................................................... 95 Annex 16: Stakeholder Engagement During PSSN II Preparation stage ............................................................ 96 Annex 17: Map of National Parks and major protected areas in Tanzania………………………..112 v LIST OF FIGURES Figures 1.a and 1.b Map of Tanzania showing areas of Maximum and Minimum Rainfall .... 3 Figure 2: Environmental Institutional arrangement for Tanzania mainland ........................ 19 Figure 3: Environmental Institutional arrangement for Tanzania Zanzibar ......................... 20 Figure 4: Cultural Heritage Management and Monitoring Plan .......................................... 44 LIST OF TABLES Table 1 Summary of Environmental and Social Standards .................................................... 16 Table 2: Summary of stakeholders needs ............................................................................... 47 vi EXECUTIVE SUMMARY 1. The Government of Tanzania (GoT) has requested the World Bank and other Development Partners (DP) namely Department for International Development (DFID), World Food Program (WFP), Bill and Melinda Gates Foundation, United States Agency of International Development, Embassy of Sweden and United Nation Agencies (UNDP, ILO and UNICEF) for their continued support for Productive Social Safety Net program (PSSN) II. The implementing agency of the proposed project is Tanzania Social Action Fund vested in the President’s Office. 2. The Second phase of Productive Social Safety Net (PSSN II) is developed following successful implementation of TASAF I and II between years 2000 to 2012 respectively, and the implementation of First phase of Productive Social Safety Net (PSSN I) program from 2012 to 2018. The implementation of the Program will cover 187 Project Area Authorities (PAAs) with more than 10,000 Villages/Mtaa/Shehia. 3. The objective of PSSN II is to improve access to income-earning opportunities and social- economic services for targeted households below the poverty line while enhancing and protecting the human capital of their children. The program will be implemented through two components namely (i) Productive Household Support (ii) Institutional Capacity and Integrated Delivery System. 4. Productive Household Support will provide participating households with an integrated package of support including productive inclusion, public works and cash transfers. Cash Transfers will enable Households to ensure a minimum level of consumption; build resilience against shocks; and invest in their children’s health and education to break the intergenerational transmission of poverty. Transfers will be largely conditional on education and/or health-related behaviors while labour-constrained households including elderly, people with disability, child-headed households will receive direct support. In addition, PW will create productive assets at community level and provide temporary employment opportunities to participating households, providing additional income to smooth consumption and mitigate shock during rainy season. Productive inclusion will consist of basic livelihood support, awareness raising and strengthening linkages to extension services and enhanced livelihood packages for selected households. 5. Institutional Capacity Strengthening and Integrated Delivery Systems ensure effective Program implementation, capacity building of Program Implementers, strengthening of inter-sectoral coordination and Program management support. 6. The proposed project will apply the new Environmental and Social Framework (ESF). The project is classified as Moderate risk based on the activities’ type, location, sensitivity, scale, nature, magnitude of potential risks and capacity of the implementing entity and commitment of the GoT. All proposed project activities will be assessed to meet the requirements of relevant ESSs. Although the existing safeguards instruments, including the Environmental and Social Management Framework (ESMF) for PSSN I will be relevant for the proposed project, extensive updates have been done to address environmental and social risks and impacts in accordance with ESS1 and the requirements of the relevant Environmental and Social Standards (ESSs).. An Environmental and Social Commitment Plan (ESCP) has been prepared, which set out measures and actions that the Program would institute to meet ESSs requirements. To address environmental and social risks and impacts of subprojects the vii following ESSs will be applicable: (i) ESS1 on Assessment and Management of Environmental and Social Risks and Impacts; (ii) ESS2 on Labor and Working Conditions; (iii) ESS3 on Resource Efficiency and Pollution Prevention and Management; (iv) ESS4 on Community Health and Safety; (v) ESS5 on Land Acquisition, Restrictions on Land use and Involuntary Resettlement; (vi) ESS6 on Biodiversity Conservation and Sustainable Management of Living Resources; (vii) ESS7 on Indigenous Peoples/Sub-Saharan African Underserved Traditional Local Communities; (viii) ESS8 on Cultural Heritage; and (ix) ESS10 on Stakeholder Engagement and Information Disclosure. 7. Parallel to ESF the Project will apply relevant national laws on protection and conservation of environment, natural resources, cultural heritage while ensuring safety and health of participants at working place. For reference, the main legislations include Environmental Management Act (2004), Village Land Act of (2002), Land Act of (2002) and Zanzibar Environment Management Act No 3 (2015) and Land Act No. 8, 9 and 10 of (1990). Sector legislations were also referred to for addressing issues on specific sectors. 8. The implementation of the Project is designed to be environmentally and socially responsible to avoid any undesirable adverse consequences of the given interventions and hence ensure the achievement of improved standards of living of the poor. Most of the project impacts would be low to moderate and localized due to the relatively small-scale nature. 9. The overall negative environmental and social impacts predicted under the Project include but not limited to: erosion of lands downhill from road-bed or in borrow areas; slips and slumps; creation of stagnant pools of water in borrow pits; generation of dust to nearby houses during subprojects implementation activities; increased sediments into streams, ponds and rivers due to erosion from road sides; and deterioration in water quality due to high silt load. 10. Implementation of PWP and Livelihood sub-component will involve manual labor provided by Project participants. In this case, Labor Management Procedures (LMP) has been prepared as a separate document to meet the objectives of ESS 2 and provide for a safe and healthy working environment. The LMP provide for safety requirements, application of Personal Protective Equipment (PPE) and emergency/accident preparedness plan for working participant. The project will apply the relevant requirements of the Environmental Health and Safety Guidelines (EHSG) 11. The Project is expected to be implemented nationwide, covering all 187 Project Area Authorities (PAAs) with different cultural backgrounds and norms. The Project is seeking to conserve and protect tangible and intangible cultural heritage of communities it serves, ensuring poverty eradication activities do not interfere with efforts to practice and promote conservation of culture and protect community heritage. The main objective of ESS8 (Cultural Heritage) is to ensure that cultural values of communities are retained irrespective of how marginal these cultures may be. It is also considered important that such heritage sites are conserved for present and future generations. 12. Stakeholder Engagement Plan (SEP) has been developed as a standalone document in accordance with the requirements of ESS10 to ensure all Project stakeholders are adequately engaged in all stages of Project activities. The Stakeholders Engagement Plan provides for identification, means viii and methods applied to approach and engage each group into the Project activities and monitoring of level of engagement through continuous consultation in entire project implementation period. 13. A Grievance Redress Mechanism (GRM) has also been prepared to ensure all Project stakeholders grievances are heard and addressed in accordance to laid procedure. 14. Capacity building. A major effort to build capacity is planned for PSSN II, particularly to address capacity constraints at subnational levels. The training strategy will build on the experience gained under PSSN I and the budget will be mainstreamed in subcomponents’ budgets. ix DEFINITIONS 15. Environment: In the context of this document, “Environment” is understood as the whole set of natural or biophysical and man-made or socio-cultural systems in which man and other organisms live, work and interact. 16. Environmental Assessment (EA): The process of managing the environmental aspects of policy, strategy, program or sub projects from the earliest stages of identifying the potential actions to their completion and evaluations. The process encompasses identification of potential adverse environmental impact, assessments of these impacts and comparison with impacts of alternative approaches; design and implementation measures and plans to avoid, minimize, mitigate, or compensate for adverse impacts; and development of associated management and monitoring measures. 17. Environmental Impact Assessment (EIA): This is a process for orderly and systematic examination/evaluation of a proposal including its alternatives, objectives and its effect on the environment including the mitigation and management of those effects. The process extends from the initial concept of the proposal through implementation to completion and, where appropriate, decommissioning. 18. Environmental Review (ER): An environmental assessment instrument in which the subproject is likely to have minimum impacts but should be reviewed with a simple and standardized checklist of possible impacts and appropriate mitigation measures. 19. Environmental Screening (ES): The process of identifying, as early as possible, the potential adverse environmental impacts of proposed sub projects assigning the environmental category indicating the level of anticipated impact corresponding level of environmental assessment required: and identifying the most relevant EA instrument needed to address the potential impacts and environmental issues associated with sub projects. 20. Preliminary Environmental Assessment (PEA): This is a systematic identification, description or initial examination of environmental and socio-economic impacts that are undertaken to obtain just enough information to determine whether or not there will be significant adverse environmental impacts as a result of the proposed project. 21. Environmental and Social Management Plan (ESMP): An instrument that details (a) the measures to be taken during the implementation and operation of a project to eliminate or offset adverse environmental impacts, or to reduce them to acceptable levels; and (b) the actions needed to implement these measures. 22. Environmental Monitoring (EM): Is the continuous or periodic measuring and recording of physical, social and economic variables associated with the project impacts. 23. Environmental Audit (EA): Means the systematic, documented, periodic and objective evaluation of how well subprojects are performing in conserving or preserving the environment. x 24. Scoping: The process for determining the extent of environmental impact of the project to be undertaken. In the process extensive consultations with principle stakeholders is mandatory in order to inform them about the proposed activities and solicit their views about it. 25. Environment Impact Statement (EIS): This is a report or document prepared by the proponent after undertaking of Environmental Impact Assessment (EIA) study to present the case for the assessment of their proposal as part of the environmental impact assessment process. 26. Public: The public includes any individual or group of individuals, Stakeholders (Affected or Interested Parties) and interest groups. These are people who are impacted by the proposed development or undertaking either directly or indirectly. Interest group may include local and/or international environmental organizations, professional societies, labor unions, local associations, individual persons, etc. xi CHAPTER ONE: BACKGROUND AND PROJECT DESCRIPTION 1.1 Background 27. The Government of the United Republic of Tanzania has put in place important policies to address poverty and vulnerability. The current Second Five-Year Development Plan (FYDP II) – 2016/17-2020/21 aims at economic transformation to enable Tanzania to become a middle-income country by 2025 and provides an overarching framework for all poverty alleviation and growth-related strategies in Tanzania. Social Protection is part of FYDP II’s larger agenda, which includes: reducing poverty; addressing social and economic risks, deprivation and vulnerability; protecting human rights; and improving capabilities and labor market outcomes. 28. In both the Tanzania Mainland and Zanzibar, efforts have been undertaken to develop social protection policies. The Zanzibar Social Protection Policy was published in 2015 and an Implementation Plan developed in 2016. On the Mainland, a process is currently underway to transform the National Social Security Policy of 2003 into a comprehensive National Social Protection Policy. The new Social Protection Policy is expected to be framed around four pillars that will henceforth underpin all social protection programs in Tanzania. These are: i) contributory social protection, including pensions; ii) non-contributory social protection, including safety nets and cash transfers; iii) demand side linkages with social services; and iv) productive inclusion and livelihoods interventions. 1.2 Baseline Data 1.2.1 Geographical location 29. Tanzania is in Eastern Africa, located between 1OS to 12OS and 30OE to 40OE. It is constituted by Mainland Tanzania and Zanzibar with a total area of 945,087 sq. km comprised of land area of 883,749 sq. km (881,289 sq. km mainland) and 2,654 sq. km Zanzibar, plus 59,050 sq. km inland water bodies. It shares borders with Kenya and Uganda in the North; Rwanda, Burundi and Democratic Republic of Congo in the West; Zambia and Malawi in the South West and Mozambique in the South. The eastern boundary is an 800 km coastal line fronting the Indian Ocean from Kenya in the north at 4°38’S to Mozambique in the South at 10°30’S. Some 40 km offshore are the islands of Zanzibar (Unguja and Pemba) and Mafia (to the South), plus numerous smaller islands. 1.2.2 Major Geographical Features 30. There is a wide variety of physical features extending from a narrow coastal belt with sandy beaches to an extensive plateau covered by savanna and bush vegetation with altitude ranging from 1000 to 2000 m. The plateau is fringed by narrow belts of forests highlands, including Mt. Meru and Mt. Kilimanjaro (5,895m), the highest mountain in Africa. Except for the coastal strip and lower parts of the main rivers, the rest of the country lies above 300m altitude. The coastal plain is relatively narrow, less than 20 km at Kenya boarder, and broadens gradually to 150 km around Dar es Salaam. Tanzania mainland has several fresh water bodies, including Lake Victoria, the largest in Africa, located on Kenya-Uganda-Tanzania boarder; Lake Tanganyika, the longest and deepest in Africa and 1 second deepest in the world after lake Baikal in Siberia, located on the boarder of Tanzania, Burundi, Zambia and Democratic Republic of Congo; and Lake Nyasa located on the boarder of Tanzania, Malawi and Mozambique. The transboundary natural resources have necessitated Tanzania and its neighbors to put in place protocols, agreements and mechanisms for the management, conservation, sustainable use and equitable sharing of benefits of these resources. 1.2.3 Economy 31. Tanzania has witness a strong economic growth in recent years. Currently, the annual average economic growth stands at 7 percent in Tanzania mainland and 6.6 percent in Zanzibar. These statistics transform it as one of the stronger performances in Sub-Sahara Africa. Despite the rapid increase in population projection of 2.7% growth rate, the GDP growth is still translated to have substantial increases in average per capital income from 510USD in 2007, 730 USD in 2011 and 979USD in 2016 across the United Republic of Tanzania1 32. Despite the above achievements, number of people living in poverty and extreme poverty remain high. Approximately 4.3 million people continue to live in extreme poverty across the United Republic of Tanzania (4.1 million on the Mainland and 0.2 million in Zanzibar), that is to say that they have less than enough to purchase the minimum food basket. Despite the reduction in the extreme poverty rate, due to population growth the absolute number of people living in extreme poverty did not decline at all between 2007 and 2011/12. As for the number of people living in basic needs poverty, on the Mainland the number declined slightly from 13.2 million to 11.9 million between 2007 - 2011/12, and in Zanzibar remained almost unchanged between 2009/10 and 2014/15 at 444,000. 1.2.4 Weather Temperature 33. Temperature in Tanzania varies according to the geographical location, relief and altitude. In the Coastal Regions and the off-shore Islands the average temperatures range between 27 °C and 29 °C, while in the Central, Northern and Western parts temperatures range between 20 °C and 30 °C and higher between the months of December and March. In the Northeast and Southwest where there are mountainous areas and Makonde Plateau, the temperature occasionally drops below 15 °C at night during the months of June and July. In some parts (Southern Highlands) temperature can reach as low as 0 °C - 6 °C. This temperature variation has significant impact on the agro-ecological zones and the adaptation strategies in the agriculture sector. Rainfall 34. The mean annual rainfall varies from 500 millimeters to 2,500 millimeters and above. The average duration of the dry season is 5 to 6 months. Tanzania’s rainfall follows two regimes namely unimodal and bimodal patterns, i.e. Northern coast and Zanzibar, North Eastern highlands and Lake Victoria basin have two rainy seasons with long rains between March and May (MAM) and short rains between October and December (OND). Also, the southern, central and western parts of the 1 Sources: URT, NBS, Household Budget Survey 2001/01, 2007 2 country have a single rainfall season between November and April. However, recently, rainfall pattern has become much unpredictable with some areas/zones receiving extremely minimum and maximum rainfall per year. Figures 1.a and 1. b show the map of Tanzania indicating average maximum and minimum rainfall from 1921 to 2005. 1.a. Extreme Maximum Rainfall 1.b. Extreme Minimum Rainfall 2 2 4 4 Latitude 6 Latitude 6 8 8 10 10 12 28 30 32 34 36 38 40 12 Longitude 28 30 32 34 36 38 40 Longitude Figures 1.a and 1.b Map of Tanzania showing areas of Maximum and Minimum Rainfall (Source: Tanzania Meteorological Agency, 2005) 1.2.5 Population 35. Tanzania at present is estimated to have about 55 million people. According to census Report, 2012, at the current growth rate of 2.7 per cent, the population of Tanzania will double in next 26 years. This growth is not only making it as among the most populated in sub Saharan Africa but also the momentum presents the opportunity for accelerating National development towards Development vision 2025 1.3 Description of the Project 36. The implementation of PSSN I is coming to an end and the Government of Tanzania is preparing the second phase (PSSN II) in order to advance the social protection agenda and consolidate the effectiveness of Social safety nets in order to build human capital and help extreme poor household move into sustainable livelihoods. The Project aims at protecting the poor from immediate effects of poverty, helping them to meet consumption needs and prevent further irreversible losses in assets, and enable poverty-stricken households to invest in their future and improve their livelihood. 37. The Project Development Objective (PDO) is to improve access to income-earning opportunities and social economic services for targeted households below the poverty line while enhancing and protecting the human capital of their children. 38. The Program is expected to achieve this objective by implementing the following principles: a) An increased focus on productive impacts 3 b) Continuing to strengthen community empowerment through participatory project management and direct financing c) Promoting transparency and accountability among stakeholders at all levels d) Enhancing the capacities of implementers at all levels to provide effective implementation management and to integrate sub projects within the context of decentralization e) Aligning the center with peripheries so as to leverage the use of public resources in favor of poor communities and disadvantages groups and; f) The use of technology for effective delivery 39. Activities under the Project will be implemented through, two main components (i) Productive Household Support; (ii) Institutional Capacity Strengthening and Integrated Delivery Systems. The detailed description of each component is as follows: 1.3.1 Component 1: Productive Household Support: 40. This component will be delivered through integrated package of three sub-components namely, Productive Inclusion (PI), Public Works and Cash Transfer (CT). The package will provide transfers through conditional and unconditional transfers and public works. The impact of these transfers will be enhanced through productive inclusion in the form of awareness-raising, coaching and training. Productive Inclusion: 41. Productive inclusion wills support savings promotion; linkages to productive services, training, mentoring and coaching will enhance the productive impacts of transfers. This support will consist of behavioral change sessions and linking of program participants to existing savings groups, asset transfer and productive services. It will further strengthen participant’s effort to use their transfers for productive investments (evidenced in PSSN I). Basic livelihoods support to all PSSN participating households with labor capacity will enhance the impacts of productive transfers. The enhanced livelihoods package will be implemented on a pilot basis, starting with participating households in the poorest PAAs. This will entail more intensive training and coaching, as well as a productive grant, with a view to enabling most of them to sustain themselves out of poverty in the medium to longer term without an ongoing need for social transfers. To underpin productive impacts of the program, a household livelihoods support will be provided conditional on participation in savings groups. Only in the case of households without labor capacity will condition be waived. Additional Productive Transfer will be provided to households with labor capacity during transition to public works conditional on participation in saving groups. Public Works 42. Public works will provide participants who have labor capacity with temporary employment through labor-intensive sub-projects that are identified by, and create assets for, the community and contributing to household income. Some of the infrastructure created is expected to contribute to addressing supply side constraints on the provision of key services in health and education. 4 Cash Transfer 43. Cash transfer will provide benefits to eligible participating households, including: i) Direct Support to all households with no labor capacity; ii) Child Grant to all household with children 0-18 year; iii) Disability Grant to all households with Person With Disability (PWD); iv) Human Development transfer to households with children, conditional on health and education behaviors. 44. Cash benefits to households under cash transfer and public works will provide the foundation for productive impacts. Based on evidence from PSSN I and other similar programs in the region, it is confidently expected that the combination within PSSN II of the Productive Inclusion, Cash Transfers and Public Works will have substantial productive impacts by: • building participating households' assets, incomes and resilience to shocks; • enabling households to invest in existing productive activities • stimulating a shift away from precarious casual labor towards more productive types of economic activity (including, but not limited to, self-employment) • stimulating the local economy, through local economic multiplier effects resulting from the injection of cash Type of anticipated subprojects to be funded 45. PSSN II will support sub-projects related to small scale Public Works Program incorporating targeted infrastructure and productive inclusion. The types of the subproject to be supported will be identified by the communities after undergoing a participatory planning process. The possible types of PWP subprojects include but not limited to: i. Community Ponds and Water and environmental conservation Subproject types: Earth ponds, hand-dug wells, pans and ponds. ii. Hand Dug Well Subproject types: Hand-dug wells, shallow wells. iii. Spring Protection, Soil and water conservation Subproject types: bench terraces, gully reshaping, filling and re-vegetation iv. Soil Bunds Subproject types: Level soil bunds, level fanya juu, stone bunds, v. Woodlots, Agro forestry & Multi-purpose tree nursery Subprojects types: Seed collection from woodlots, homesteads areas and forests, tree/shrub seedlings and grass nurseries, Restoration of degraded land/area, Gully reshaping, filling and revegetation, Eyebrow basins, herring bones, improved pits, micro basins, micro trenches, water collection trenches vi. Community Access Roads Subprojects types: New access (road) construction, foot bridges and culverts, Gravel/Earth road vii. Small Scale Irrigation Subprojects type: Catch/cut-off drain, Micro ponds, river bed/permeable rock dams, small scale drip irrigation, small scale surface irrigation, and hand dug wells 5 46. The brief description on the nature and estimated cost for major types of subprojects to be implemented under PW is shown as Annex 1 1.3.2 Component 2: Institutional strengthening and integrated delivery systems 47. This component will ensure effective program implementation, and that lessons learned are used to further strengthen Program impacts over time. This component will reinforce implementation capacities and program systems at national and decentralized levels. 48. The component will be responsible for: preparation of an exit and graduation strategy; recertification of participants to ensure that the program continues to reach the poorest households; moving from the existing participant registry to a social registry serving all sectors to promote a harmonized approach to service delivery. Further, the component will strengthen grievance redress and other social accountability mechanisms to ensure the program is accountable to the citizens served and will continue investment in robust impact evaluation and process reviews for learning and accountability; and shifting from cash-based to electronic payments. 49. The Program will apply the new Environmental and Social Framework (ESF). Although the existing safeguards instruments, including the Environmental and Social Management Framework (ESMF) for phase I will be relevant for the proposed project, extensive update has been done to address new requirements of the relevant Environmental and Social standards. Overall, the project is expected to involve Moderate Risk activities based on type location sensitivity, scale, nature, magnitude of potential risks and capacity and commitment of the implementing entity. According to the Environmental and Social Framework (ESF) risk classification assigned to the project will be reviewed on a regular basis, during implementation and will change where necessary to ensure it continues to be appropriate. 50. Activities/investments envisaged under PWP are small and labour intensive. The main types include; soil and water conservation, community access roads, woodlots, rain water harvesting entailing construction of community ponds, spring protection, hand dug wells; soil and water conservation that includes construction of soil bunds, sea water control bunds, gullies protection and flood control structures. 51. These interventions may have environmental implications on the biological and physical environmental during implementation and operation phases. These activities aim at conserving the environment, however and they will be screened to identify any potential environmental and social impacts. Based on the perceived level of impacts as indicated from the environmental and social screening stage, appropriate safeguards instrument namely Environmental and Social Management Plans (ESMPs) will be prepared to mitigate potential negative impacts. 6 52. All proposed project activities will be assessed to meet the requirements of relevant Environmental and Social standards (ESSs). Therefore, issues regarding community workers, health and safety, application of general Environmental Health and Safety Guidelines (EHSG) and labor management procedures will be addressed accordingly. An Environmental and Social Commitment Plan (ESCP) has been prepared, which set out measures and actions required to meet ESSs. Project coverage 53. The project has been rolled out country wide and covered 161 Project Area Authorities (PAAs). However, 30 % of the villages were not covered in PSSN I. Thus, targeting and enrolment in these villages will be done prior to PSSN II project implementation. In PSSN II the program will cover 187 PAAs. 7 CHAPTER 2: ASSESMENT AND MANAGEMENT OF ENVIRONMENTAL AND SOCIAL RISKS AND IMPACTS 2.1 Introduction 54. In order to minimize the environmental and social impacts associated with implementation of the project activities, environmental and social assessment is required. Given that the exact locations of proposed subprojects are not known at appraisal, an Environmental and Social Management Framework (ESMF) has been prepared to guide the assessment of environmental and social risks and management of the potential impacts during project implementation. . 55. The Environmental and Social Framework (ESF) encompasses Environmental and Social Standard (ESSI) which sets out the responsibilities to assess, manage and monitor environmental and social risks and impact during each stage of the Project. 56. Objectives of Environmental and in Social Standards (ESSI). I. To identify, evaluate and manage the environmental and social risks and impact of the program in a manner consistent with the ESSs; • To adopt the mitigation hierarchy approach • Anticipate and avoid risks and impacts • where avoidance is not feasible minimize or reduce risk and impact to acceptable levels • once risk and impact has been minimized or reduced, mitigate and • where significant residual impact remains compensate for or offset them where technically and financially feasible (i) To adopt differentiated measures so that adverse impacts do not fall disproportionately on disadvantage of vulnerable, and they are not disadvantaged in sharing development benefits and opportunities resulting from the Project. (ii) To utilize national environmental and social institutions, systems, law, regulations and procedures in the assessment, development and implementation of projects, whenever appropriate. (iii) To promote improved environmental and social performance, in ways which recognize and enhance GoT capacity. 57. ESMF will be disclosed in country and at the website of the World Bank so that the document is accessible to the general public, local communities, potential project-affected groups, local NGO’s and all other stakeholders. It is also required to undertake consultation of those groups to get their views on the adequacy of the ESMF. Stakeholders Consultation during the preparation of PSSN II 58. Stakeholders Consultation has been a key element during the preparation of Safeguards instruments for PSSN II. Consultation was done to ensure effective participation of all stakeholders throughout the Program implementation period. It also enhances the dynamic process that involve different stakeholders across all levels from the national down to the community levels, to have their view contribute to, hence influence the meaningful decisions making process on the Program 8 implementation for best outcome. During the PSSN II preparation the following stakeholders were consulted as follows; 59. The communities: Consultation was done at community level to beneficiaries and general public, which mainly aimed at; 1) to collect information on the Program that would be taken as key lesson learnt through the implementation of PSSN I, and with those 2) inform the design of PSSN II. The PSSN II Project Preparation Team (PPT) made a site visits to selected PAAs to collect stakeholder views on proposed design elements for the new Program phase. Among the components discussed during the consultation meetings, environmental and social safeguards were one of area identified for feedback as well as input into PSSN design. During consultation meetings it was reiterated that safeguards tools should be simplified for ease of documentation procedures, the option which has been observed through the application of ESF and its standards. 60. At the community level consultation were held through public meetings which was organized by Village Councils and attended by all stakeholders in the areas. Annex 16 provides the details of Stakeholder consultation. 61. Ministries and Government Institutions: Consultation was done to Ministries under the Government of the United Republic of Tanzania, Revolutionary Government of Zanzibar and various institutions. The ministries consulted include the Ministry of Land, Housing and Human Settlement Development, Presidents’ Office Regional Administration and Local Government, while institutions consulted include the National Environment Management Council (NEMC), Zanzibar Environment Management Authority (ZEMA) and Division of Environment Vice Presidents’ Office. The consultation with Ministries and governmental institutions was done in a specific consultative meeting convened to collect inputs on environmental and social safeguard for PSSN II design. 62. Vulnerable Groups: On consultation to vulnerable groups (previously known as Disadvantaged Communities) specific site visits was done to four of seven PAAs with such communities, namely Kiteto, Hanang, Mbulu and Karatu. The consultation on VG communities was conducted in a special method whereby beneficiaries, general community and NGOs/CBOs operating in those areas were consulted in village meetings, focus group discussions and individual interviews. The objective was to gather opinion on PSSN I implementation and recommendations for environmental and social safeguards to serve as inputs to ensure adequate inclusion of vulnerable groups into PSSN II activities. During the consultation process, it was found that ESF through ESS 7 is adequately address issues of their interest, including among other being included into the decision- making organs of the communities they live in or have a collective benefit thereof. 63. During implementation of PSSN I, a number of environmental and social safeguards tools were developed to enable adequate implementation of the project and assist manage adverse environmental and social impacts emanated from Program activities. Screening of subprojects was conducted during micro planning to identify possible adverse impacts and to propose ways to mitigate them. An Environmental and Social Management Plan (ESMP) was prepared to mitigate potential impacts indicating distribution of responsibilities, timeframe and resources required. An Environmental and Social Monitoring Plan was prepared to guide monitoring effectiveness of mitigation measures. 9 Additionally, PWP Handbook provided guidance on adherence to Safeguards requirements during subproject implementation. 64. As stated above, the purpose of ESMF is to provide guiding principles for assessment and management of environmental and social aspects of all physical works targeted under PSSN II. It will help to systematically identify, predict and evaluate beneficial and adverse environmental and social impacts of subprojects to be financed under the project. 2.1 Objectives of the ESMF 65. The main objective of ESMF is to provide guidelines and procedure to deal with environmental and social risks and impacts associated with the implementation of this Program to meet the requirements of the relevant E & S standards. It is also intended to serve as a mechanism to determine and assess potential environmental and social risks and impacts of all activities financed under the Program and then to set out mitigation, monitoring and institutional measures to be taken during implementation and operation of the program activities to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels. 66. The specific objectives are as follows: • Review the institutional, policy, legal and political framework for environmental and social management of the Program. • Outline the process for environmental and social management procedures in: 1) ensuring environmental and social sustainability of Program interventions; and 2) meeting World Bank and Tanzanian requirements for environmental and social management; • Based on the experiences gained in PSSN I, assess the potential environmental and social impacts of the Program, whether positive or negative, and ensure mitigation measures are incorporated into subprojects to avoid, minimize or mitigate these potential impacts; • Establish mechanism for handling grievances related to environmental and social issues during program implementation. Provide guideline on consultation of stakeholders for a meaningful result of project objective. • Serve as a tool for project implementers at the National, PAAs, Ward, /Village/Mtaa/Shehia level to identify and mitigate potential environmental and social impacts during sub-project planning implementation as well as operation maintenance. 2.2 Potential Users of this ESMF 67. This ESMF has been prepared as a reference manual for use by key stakeholders to be involved in the implementation of the Program activities. As a reference material, the ESMF will be useful to the following Program key stakeholders: The Second Vice President’s Office, Zanzibar, TASAF Management Unit (TMU), Development Partners (DPs), line Ministries, Non-Governmental Organizations, PAAs, Community Based Organizations and Communities in general. 10 2.3 Institutional Arrangements 68. The Program will continue to be implemented through government structures and will promote inter-ministerial co-ordination at national and PAA levels, thereby contributing to the building of a sustainable social protection system. National Level 69. At the National level, TASAF is under President Office, with the overall oversight vested with the National Steering Committee (NSC). Moreover, a Sector Expert Team (SET) for Mainland and Zanzibar ensures that designs conform to different technical sector norms and standards. Subprojects applications will be reviewed by SET on sample basis to identify challenges in design process and provide the technical support required to improve designs. In Zanzibar, the PSSN is coordinated by the Office of the Second Vice President (2nd VPO). There is a Focal Person in this office to oversee all PSSN activities, as well as Coordinators and Steering and Management Committees for Pemba and Unguja. Regional Level 70. At the regional level, Regional Administrative Secretary (RAS) will appoint a focal person to provide technical backstopping on implementation of the program activities, review and compile quarterly implementation reports from PAAs. PAA level 71. The program will be managed by the PAA Director, who signs a Memorandum of Understanding with TASAF, articulating roles and responsibilities. The PAA Director appoints a PSSN Coordinators to oversee Program activities and an Accountant to handle financial matters, including the consolidation of public works payrolls. TMU will allocate a Monitoring Officer to provide technical support to one or two PAAs. Ward Level. 72. At Ward level, extension staff will lead the sensitization process, training and participatory planning with oversight support from PAAs. Specialized sensitization and training will cover area like subproject identification, micro-planning safeguard issues and management of subprojects at community level. With this institutional framework it is imperative that capacity building and training is required especially at the ward and PAA/Zanzibar level to ensure sufficient implementation of this ESMF in line with existing country legislation and procedures and in compliance with the World Bank ESF. Village/Mtaa/ Shehia 73. The Village Council/Mtaa Committee/Shehia Advisory Council will continue to be the overseer of PSSN II at the village/Shehia level. They will mobilize resources and ensure effective delivery of 11 the project, and security and sustainability of the assets and facilities created. In addition, the Village Council/Shehia Advisory Council will facilitate and monitor the performance of CMCs. The CMCs are democratically elected from community members and beneficiaries and will be responsible for facilitating effective delivery of the project interventions. Given their important roles, capacity of Community Management Committee will be enhanced. 12 CHAPTER 3: OVERVIEW OF POLICIES, LEGISLATION AND INSTITUTIONAL ARRANGEMENTS 3.1 Introduction 74. Tanzanian basic environmental law is the Environmental Management Act of 2004 and Zanzibar Environmental Management Act, 2015. They are both supported by the Constitution of the United Republic of Tanzania and other sectoral and cross-sectoral laws and common law. 75. In some incidences Tanzanian environmental laws have been categorized into first, land use laws; second, natural resources and conservation areas laws; third, pollution-related laws; and, fourth, overall environmental management law. With this categorization, sometimes it may not be easy to differentiate one category from the other due to their inter-linkage. For this convolution, it is felt that presentation of laws will be relative to the wide cross-sectoral and sectoral approach as represented by the National Environmental Policy, 1997. The policy covers sectors that include land and human settlements; forestry; water and sanitation; health; transport; energy; industry; wetlands; agriculture; livestock; fisheries; wildlife; tourism; and mining. The National Environmental Policy, 1997 has relative policy statements to other sectoral and cross-sectoral policies upon which the Tanzanian environmental laws are premised. The following policies and laws are applied. 3.2 Environmental Policies 76. The National Environment Policy for mainland (NEP 1997) and Environmental Policy for Zanzibar (2013) are the main policy documents addressing environmental management issues in Tanzania. They identify sustainable development as a key issue in the National Environment Management Policy in the country. The policies state government’s commitment to sustainable development on the short, medium and long-term development basis. It requires the Tanzanian people to manage their environment and natural resources in a sustainable manner to enhance the potential for growth and opportunity for sustainable development of present and future generation. 3.3 Other sectoral policies Other sectoral policies applicable in mainland and Zanzibar include; (a) Sectoral policies Tanzania mainland: 3.3.1 National Land Policy (1995) 77. The Policy advocates equitable distribution and access to land by all citizens. It aims at ensuring that existing rights in land especially customary rights of small holders (i.e. peasants and herdsmen who form the majority of the country’s population) are recognized, clarified, and secured by law. Under the policy framework, land is to be put to its most productive use to promote rapid social and economic development of the country among other objectives. This implies that land that provides livelihood to Disadvantaged Communities is to be protected and made available for their use. 13 3.3.2 Agriculture and Livestock Policy (1997) 78. The overall aim of the Policy is to promote and ensure a secure land tenure system to encourage optimal use of land resources and facilitate broad-based social and economic development without upsetting or endangering the ecological balance of the environment. The land use plan in the Program will be observed to protect the rights of hunters-gatherers, livestock keepers, and specific uses on Disadvantaged Communities. 3.3.3 National Forestry Policy, 1998 79. This policy reiterates the sustainable use of natural resources from forests and ensuring equitable use. The policy requires protection and prevention of anthropogenic activities that may result into depletion of resource. 3.3.4 National Human Settlement Policy (2000) 80. There are fourteen (14) main objectives but for the purpose of this Program the following five (5) shall be emphasized because they have direct or indirect impacts to the Program. • To make serviced land available for shelter and human settlement development in general to all sections of the community including women, youth, the elderly, disabled and vulnerable communities • To improve the level of provision of infrastructure and social services for sustainable human settlement development; • To facilitate creation of employment opportunities and eradication of poverty; • To protect the environment of human settlements and of ecosystems from pollution, degradation and destruction in order to attain sustainable development; and • To encourage development of housing areas that is functional, healthy, aesthetically pleasant and environmentally friendly. (b) Sectoral policies –Zanzibar i. Zanzibar Environmental Policy (2013) ii. Zanzibar Land Policy (2017) iii. Community Development Policy (1996) iv. Water policy (2004) v. Zanzibar Climate Change Strategy (2014) vi. Agricultural, livestock and Irrigation Policy (1983) vii. National Forest Policy for Zanzibar (1999) (c) Strategies/programmes related to Environment and Social Management Tanzania Mainland: i. National Environment Action Plan (NEAP, 2004) ii. Tanzania Development Vision (Vision 2025) iii. Agricultural Sector Development Strategy (ASDS 2001) iv. Road Sector Development Programme (1999) v. Local Government Reform Programme. vi. National Climate Change Strategy, 2012 14 3.3.5 Environmental Legislation: 81. Two environmental legislations are in place namely Environmental Management Act (EMA) 2004 for mainland Tanzania and Zanzibar Environmental Management Act No 3 of 2015. 82. Both Acts provide practical guidelines useful to decision makers and authorities involved in any field of activity or projects with a link to environmental issues. The laws call for an integration of environmental concerns into the socio- economic development plans and require that EIA be carried out prior to project implementation. Both Tanzania mainland and Zanzibar has comprehensive set of regulations governing EIA process. 83. Other Legislations for Tanzania Mainland and for Zanzibar are as follows: a. Legislations (Mainland) Land Act, Cap 113 R.E. 2002; Land (Conditions of Rights of Occupancy) Regulations, 2001 Village Land Act, Cap 114 R.E. 2002; Village Land Regulations, 2001 Forests Act, 2002 Cap 323 R.E. 2002; Land Use Planning Act, 2007; Urban Planning Act, 2007; Local Government (District Authorities) Act, No. 7, 1982; Local Government (Urban Authorities) Act, No. 8, 1982; b. Legislations (Zanzibar): (i) Land Adjudication Act No. 8 of 1990 (ii) Registered Land Act No. 10 of 1990 (iii) Land Tenure (Revised) Act No. 12 of 1992 (iv) Land Transfer Act No. 8 of 1994 (v) Land Tribunal Act No.7 of 1994 (vi) Forest Act No. 10 of 1996 (vii) Agricultural Research Institute Act No 8 of 2012 (viii) Fisheries Act No. 10 of 2010 (ix) Local Government Act No 7 of 2014 (x) Water Act No. 4 of 2006 3.4 World Bank Environmental and Social Framework 84. On environmental and social safeguards, the PSSN II implementation will be guided by WB Environmental and Social Framework (ESF). Under the ESF, the Program will adhere to requirements of Environmental and Social Standards (ESS), with emphasis to the following ESS that have been identified to be relevant to the Program activities: ESS1 on Assessment and Management of Environmental and Social Risks and Impacts; (ii) ESS2 on Labor and Working Conditions; (iii) ESS3 on Resource Efficiency and Pollution Prevention and Management; (iv) ESS4 on Community Health and Safety; (v) ESS5 on Land Acquisition, Restrictions on Land use and Involuntary Resettlement; 15 (vi) ESS6 on Biodiversity Conservation and Sustainable Management of Living Resources; (vii) ESS7 on Indigenous Peoples/Sub-Saharan African Underserved Traditional Local Communities; (viii) ESS8 on Cultural Heritage; and (ix) ESS10 on Stakeholder Engagement and Information Disclosure. 85. The main objectives of Environmental and Social Framework (ESF) are: i. To inform decision makers of the nature of environmental and social risk ii. to ensure that Bank-financed projects are environmentally sound and sustainable, and that decision-making is improved through appropriate analysis of actions and of their likely environmental impacts. iii. To increase transparency and provide mechanism for participation of stakeholders in decision making process for the project. 86. The application of ESS5 on Land Acquisition, Restriction on Land Use and Involuntary Resettlement and ESS 7 ion Sub-Saharan Historically Underserved Traditional Local Communities have been elaborated in separate instruments. 87. The implementation of ESSs will be enabled through number of tools which have been developed along with respective ESS. Environmental and Social Screening and Monitoring form; Stakeholders Engagement forms; Land Ownership and Acquisition forms; Disadvantaged communities Screening and Monitoring forms; Environmental and Social Management Plans and PW Handbook are among tools which have been already developed to enable implement ESSs. The developed tools and those to be developed in the course of Project implementation are clearly indicated on Environmental and Social Commitment Plan (ESCP). 88. The matrix below summarizes Environmental and Social Standards (ESSs) that will be emphasized during PSSN II implementation. Table 1 Summary of Environmental and Social Standards S/N Safeguard The Environmental and Social Purpose Guideline Standards Instrument 1 Environmenta ESS1 on Assessment and Identification of adverse impacts and l and social Management of Environmental and respective mitigation measures management Social Risks and Impacts Enable follow up of remedies framework achieved through application of (ESMF) mitigation measures Enable allocation of responsibilities and resources to implement required mitigation measures ESS2 on Labor and Working Ensure a healthy and safe working Conditions; environment during subprojects implementation ESS3 Resource Efficiency and To provide guidance on vegetation Pollution Prevention and types to be planted in woodlots and Management manage promote safe use of agrochemical and IPM practices To manage potential risks from community workers during 16 S/N Safeguard The Environmental and Social Purpose Guideline Standards Instrument ESS4 on Community Health and construction of the small-scale Safety infrastructures. ESS6 on Biodiversity Conservation To provide guidance on designing and Sustainable Management of ang implementation of conservation Living Resources or sustainable management of natural resources. ESS 8 on Cultural Heritage; To enhance conservation of cultural heritage in both forms; tangible and intangible cultural heritage To conserve ecological and socially sensitive places from possible impacts of program implementation ESS 10 on Stakeholder Engagement To enable ascertaining of adequate and Information Disclosure FPIC to community members To create awareness of targeted groups at PAA and village levels on ESF standards 2 Land ESS5 on Land Acquisition, To ascertain availability of land for a Acquisition Restriction on Land Use and designed subproject Policy Involuntary Resettlement; To track potential changes in land Framework acquisition and ownership status and address grievances emanating thereof To enhance awareness on land issues and its usefulness in addressing conflicts that may raise due to Program implementation 3 Vulnerable ESS 7 on Sub-Saharan Historically To provide guidance on preparation Groups Underserved Traditional Local of subprojects-specific Planning Communities Disadvantaged Communities Plans at Framework PAAs and village levels To have consistent steps and format of subprojects specific Disadvantaged Communities Plans To enable Disadvantaged communities to participate in PWP and LE activities while taking care of their socio-cultural interests and hindrances 89. In accordance with the Tanzania Environment Impact Assessment and Audit Regulation of 2005 on sub-projects to be funded under the Project will fall under category B, Thus, the most appropriate instruments to be used for environmental assessment is Preliminary Environmental Assessment (PEA). Under the ESF, impacts from the proposed project activities are rated moderate. This means that the environmental and social impacts of the sub-projects are expected to be minimal, site specific and manageable to an accepted level. 17 3.5 Environmental Institutional Arrangements: 90. The presence of institutional and legal framework is a pre-requisite for effective implementation of Environment Policy objectives at all levels (National, Sectoral, PAAs, and Village/Shehia/Mtaa levels) and for effective environmental management in the country. 91. According to EMA, various Environmental Management Committees need to be established at Kitongoji, Village/Mtaa/Shehia, Ward, LGA and at National level with the responsibility for the proper management of the environment in respect of the area in which they are established. The functions and responsibility of these committees are well explained in the Act. Section 36 (1), (2) stipulates that each City, Municipal, District and Town councils shall designate or appoint an Environmental Management Officer (EMO) who shall perform among the following functions: i) Advice the environmental management committee to which he/she belongs on all matters related to the environment. ii) Promote environmental awareness in the area he/she belongs on the protection of the environment and the conservation of natural resources. iii) Monitor the preparation, review and approval of Environmental Impact Assessment for local investments. 92. Institutional set up for environmental management in Tanzania Mainland is as presented in Figure 2 below. 18 Vice President’s Office (Minister Responsible for Environment) Division of Environment (DOE) (Director of Environment) NEMC National Environmental (Director General) Advisory Committee Regional Secretariat Sector Ministry Environmental (Regional Environmental Sections Management Experts) (Sector Environment Coordinators) City council Municipality Town Council District Council (City Council Env. (Municipal Env. (Town Council (District Council Env. Management Officer) Management Officer) Env. Management Management Officer) City Env. Management Municipal Env. Officer) District Council Env. Committee Management Town Council Env. Management Committee Committee Management Committee Township/Ward (Township/ward Env. Management Officer) Township/Ward Env. Ward Management Committee (Ward Env. Management Officer) Ward Env. Management Committee Village (Village Env. Management Officer) Village Env Management Committee Mitaa (Mitaa Env. Management Officer) Mitaa Env. Management Kitongoji (Kitongoji Env. Management Officer) Committee Kitongoji Env. Management Committee Figure 2: Environmental Institutional arrangement for Tanzania mainland 93. The Second Vice President’s Office, Zanzibar is responsible for implementation of Zanzibar Environmental Management Act, No. 3 of 2015. The following organs are mandated for executions of environmental management functions; 19 i) Environmental Advisory Committee ii) Department of environment in the Ministry responsible for environment iii) Zanzibar Environmental Management Authority in the Ministry responsible for environment iv) Board of the Authority The Second Vice President’s Office (Minister Responsible for Environment) Department of Environment (DOE) (Director of Environment) Zanzibar Environmental Environmental Advisory Management Authority (ZEMA) Committee (Director General of ZEMA) (Director General) Board of the Authority Figure 3: Environmental Institutional arrangement for Tanzania Zanzibar 3.6 Linkage of PSSN II on Policies, Legislation and Institutional Arrangement 94. Institutional mandate and responsibilities of environmental management is well elaborated from central level down to local government and local community level. 20 95. During implementation of Program, capacity building and training in environmental and social management are the key elements in program implementation since, it has been observed that capacity in this field is still limited at PAA level. Most of the officials designated or appointed as Environmental Management Officers are basically not well trained to handle environmental issues comprehensively. 3.7 Environmental Assessment Process and Procedures 96. This section discusses the steps involved in the environmental assessment process and procedure leading towards the review and approval of subprojects under the Program. The section gives an explicit description of roles, reporting and advice mechanisms during implementation of the project. 3.7.1 EIA Procedure in the Program 97. The EMA, 2004 and its EIA and Audit Regulation of 2005, requires that, EIA be mandatory for projects which cause adverse environmental and social impacts. Projects listed in the first schedule of the EIA and Audit Regulations may or may not require EIA as shown in Annex 2. 98. For small scale projects and enterprises listed in Annex 3, where the Program falls, requires Preliminary Environmental Assessment (PEA). Subprojects requiring PEA are likely to have less significant adverse environmental and social impacts but that the magnitude of the impacts are not well-known, a preliminary environmental assessment is required to decide whether the project can proceed without a full environmental impact assessment. 99. For sub projects that require PEA the procedure will involve the following stages: subproject identification, screening, preliminary environmental assessment, reviewing, permitting decision, monitoring and reporting. 3.7.2 Steps toward Environmental and Social Management under ESS1 The following are steps for sub projects screening for environmental and social impacts; Step 1: Sub Project Screening for potential impacts. 100. Mobilize communities and sensitize them on the importance of screening. Failure for communities, LSP, CMC and VC leaders to understand the importance of screening may lead to continued environmental problems. Therefore, participatory tools such as Mapping, Ranking, Focus Group Discussion (FGD) and others will be used. The following points will be considered: a) PAAs technical team should undertake the exercise at the community during micro planning. b) Assign responsibilities to each of the team member and ensure that each member thoroughly prepares prior to screening. c) Take all the relevant materials needed including the screening forms; d) Screening will be done during micro planning (see screening form in Annex 4 and 5), and the process will be participatory. Other influential leaders can also be invited. e) Explain the purpose for your visit and the significance of the exercise to the community. Let them participate throughout in the processes. Facilitators will only guide them. 21 f) Discuss with the group members on the types of subproject they would undertake; g) Discuss with members the main activities involved in each type of the subproject throughout the project cycle. h) Discuss with members the main potential environmental and social problems the project would cause. This step will indicate whether or not a subproject has significant adverse environmental/social impacts and risks, whether the relevant standards would be applicable to the subproject and what specific instrument/s will be prepared and measures to implement to meet the requirements of the relevant standards. i) List the main potential impacts on a board or flip chart and member’s record in their notebooks: Step 2: Development of an Environmental and Social Management Plans (ESMPs) 101. At this stage, CMC with guidance from PAAs sector experts will use information from the screening form to develop respective ESMPs containing the following: a) The relevant project activities; b) The potential negative environmental and Social Impacts; c) The proposed mitigation measures; d) The persons responsible for implementation of the mitigation measures; e) The persons responsible for monitoring the implementation of the mitigation measures; f) The frequency of the afore-mentioned measures; g) The capacity building needs and h) The cost estimates- The total cost of the mitigation is inbuilt into the project cost. The ESMP guides the supervision, monitoring and evaluation of the implementation of mitigation measures. The ESMP form will be completed for each subproject implemented. Format of ESMP form is attached on Annex 6. The ESMP will be prepared for each subproject implemented under the Program. A Handbook on PW will be used to guide ESMP preparation especially in terms of site specific issues such as selection of site for a defined sub-activity, location of solid waste disposal area and sanitation arrangements at the site. Step 3: Review and Approval 102. The PAAs Management Team will review the results and recommendations presented in the environmental and social screening forms and the proposed mitigation measures presented in the environmental and social checklists (Annex 7) as a basis for making recommendations for subproject approval. Step 4: Monitoring of ESMP 103. The purpose of Monitoring the ESMP is to: i. Ensure that proper appraisals on the effects of sub-projects takes place and that proper measures are put in place to mitigate the effects; ii. Set out the basis for compliance and enforcement of terms and conditions for approval; 22 iii. Design compliance strategies; iv. Assess compliance with and management of the environment and social safeguards. v. Ensure that all stakeholders participate in the sub-project processes. 104. Safeguards monitoring system with clear monitoring indicators and tools will be developed prior to the start of implementation of PW sub projects. This will be used by respective PAAs Environment Officers and extension officers to carry out the monitoring of sub projects during implementation, as well as during subproject operation and maintenance. 105. Since monitoring, evaluation and reporting on safeguards issues will form part of the overall sub-project implementation processes, the CMC will submit reports through extension officers at Ward level on bi-monthly basis to the PAA. The PAA will then consolidate in their quarterly reports submitted to TMU. 106. On satisfactory implementation of mitigations measures and adequate reporting, the PAAs Environment Officer shall then certify that a subproject has met the requirements of mitigation and will be included in the completion certificate. 107. Information on compliance to environmental and social safeguards will also be generated from quarterly reports, annual reports and field assessment reports by safeguards unit, evaluation reports, and feedback meetings and during Joint Review and Implementation Support Missions (JRISM). End of the subproject implementation 108. The Implementation of ESMF will rely on the existing PAAs structures, TASAF/TMU personnel and the Safeguards (Environmental and Social Management) Specialist. At the PAA level the ESMF implementation will be supervised by the respective Environment Officers and ward Extension Officers who will also be supported by sector-specific experts. 3.8 Potential Environmental and Social Risk and Impact 109. The implementation of the Program is designed to be environmentally and socially sensitive so as to avoid any undesirable adverse consequences of the specified interventions and hence ensure the achievement of improved standards of living of the poor. Most of the project impacts would be localized due to being relatively of small scale. Nevertheless, there are some issues of concern that cut across the range of proposed interventions. Field studies and lessons from similar programs show that issues such as community participation, community ownership and selection of appropriate sites are some of the key concerns that influence project success, sustainability and impact to the environment. 110. Impact assessment refers to the identification and evaluation of environmental and social changes occurring as a result of implementing a project. It is a systematic and integrative process of drawing together an analysis of the likely environmental and social effects of a particular project. It is a critical process that makes use of baseline information that describes biophysical and social aspects of the project area and determines the most significant adverse impacts. 23 Objectives of impact assessment 111. Impact assessment involves the actual investigation and reporting of the results of the assessment. The objectives of the impact assessment include; (i) Identification of both positive and negative impacts of the project (ii) Identification of tools and techniques for impact analysis (iii) Proposing measures to mitigate adverse impacts (iv) Development of plans for management and monitoring of the impacts 112. Impact Assessment ensures that environmental and social criteria are considered in the early stages of project planning alongside economic viability. To this end the impact assessment will: i. Provides alternative options (location, technology, processes etc.) to the sub project ii. Safeguards the subproject against mitigation measures through retrofitting 113. For effective impacts identification, various stakeholders will be consulted for potential environmental and social impacts likely to arise during the Program implementation: This in general will include environmental protection agencies, affected district and municipal assemblies, inline ministries, NGOs, CBOs and communities that implement the project. 114. The likely potential positive and negative impacts of the Program are detailed in the following section. 3.8.1 Overall Environmental and Social impacts 115. Environmental and social sustainability are fundamental to overall sustainable development strategies, natural resource conservation, and poverty alleviation. Lessons learned from TASAF II and elsewhere demonstrate that community involvement in the decision-making and management process may bring effective and lasting improvement in the livelihoods of people and can lead to better use and protection of the natural resource base. Therefore, environmental and social sustainability are fundamental to the success of Program. 3.8.2 Potential Positive Impacts 116. Subprojects to be implemented under the Program will be mainly PWP and PI aiming at creating employment and increase consumption and income of poor households. Sub projects will strengthen traditional systems of environmental and social governance and embrace the notion of community dialogue through effective functioning of Village/Shehia/Mtaa or inter-Village/Shehia committees for community land, environmental and social management. Some of the potential impacts resulting from the project implementation are as follows: • The project will help promote the decentralization process through support to capacity building interventions. The Tanzania local government system is based on political devolution and decentralization of functions and finances within the framework of a unitary state. Local governments will be holistic, i.e. multi-sectoral, government units with a legal status (body corporate) operating on the basis of discretionary, but general powers under the legal framework constituted by the national legislation. Local governments have the responsibility for social 24 development and public provision within their jurisdiction, facilitation of maintenance of law and order and issues of national importance such as education, health, water, roads and agriculture. Local governments have constituted unitary governance systems all over the country based on elected councils and committees and a professional administration. • The project will support activities to increase literacy and reduce poverty, and will help communities to become better informed on impacts of degradation of natural resources and encourage conservation. • Strategically placed infrastructure development and associated services may enable more sustainable production systems (e.g. forestry, agriculture etc.); as well stimulating private investment in the forests and agricultural sector but also in other sectors, such as tourism, particularly in and around conservation areas. • Maintenance and rehabilitation of rural roads will increase access to markets and social services, such as health care and education. • The project will result in better management of natural resources surrounding planned interventions and above all it has the potential of improving land administration including land tenure systems. • An increased number of strategically located small-scale water points will help meet the need for potable water and lead to a more diffused distribution of human and livestock pressures on existing limited resources. • Effective management and reversal of degradation of natural habitants through a variety of known soil and water conservation techniques (rock bunds, composting, windbreaks, reforestation, water catchments etc.) will lead to a positive impact on conservation of natural habitats and biodiversity. • Local institutional strengthening and empowerment is achieved through improved understanding and use of the tools and mechanisms for environmental and social impact assessment and participatory approaches to community development (e.g. development of a community development plan); and investment in social and economic infrastructure, such as construction or rehabilitation of health facilities, school classrooms, markets, etc. will result in improvement in people’s well-being and livelihoods, and promote equitable development and hence improve livelihood security of an individual within a rural/ urban community. • Consequently, the Program project activities have the potential to make a significance contribution to Tanzania’s policies to protect and preserve the environment while reducing poverty to the population. 25 3.8.3 Potential Adverse Impacts 117. It is expected that the implementation of the Program activities might have environmental impacts. The environmental and social impact predicted included but not limited to: • Erosion of lands downhill from roadbed or in borrow areas • Landslides, slips and slumps • Creation of stagnant pools of water in left borrow pits • Create dust to nearby house during • Increased sediments into streams, ponds and rivers due to erosion from road sides. • Decline in water quality due to high silt load • Increased run-off and flooding conditions • Disruption or destruction of wildlife • Threats to rare and endangered species • Increased access to forests, protected areas and increased risks of logging and Poaching 118. These impacts vary in intensity based on the following reasoning: 119. Livelihoods and environment, particularly in the rural setting are sometimes varied and unpredictable (e.g. stratified and achieving effective participation by marginalized groups, including women, youth and migrants, may require good facilitation). For details on potential adverse impact refer to Annex 5. ▪ Lack of adequate capacity for environmental and social screening of small scale activities in some local government authorities may exacerbate existing environmental and social issues affecting communities within the target areas. This may affect the quality of implementation of ESMP if not addressed adequately. ▪ Alternative livelihoods and intensification of agricultural production, which may result in improved well-being, may also lead to an increase in area of cultivation, may increase demand on natural resources or degrade the surrounding environment. Adequate facilitation is required to mitigate this potential adverse effect. ▪ Rising population pressures, a deteriorating resources base, desertification and drought due to climate change and intensification of the agricultural production systems often lead to an increase in land-related conflicts. The introduction of investments in these areas may attract outside immigrants that will further increase pressure on existing resources and possibly increase land-related conflicts. ▪ Some sub projects supported by the Program may not bring the intended benefits to certain vulnerable groups and to the poor and may further contribute to inequitable distribution of resources and marginalizing of these groups. The development of a District/Village Development yearly planning seeks to avoid this, however the consistency of active participation by vulnerable groups may vary and cannot be ensured. Further, the ability of vulnerable groups and the poorer segments of the population to express their views and needs cannot be stated at this time. 26 120. Therefore, it is crucial for communities to receive support from skilled and experienced facilitators in methods of community participation, project planning and management when planning activities and sub- projects. It is equally important that follow up be made in order ensure that the concerns of the poor and vulnerable groups have been taken into consideration over time. 3.8.4 Localized Negative Impacts 121. Sub-projects to be implemented under the Program are expected be small in size and scale. Consequently, the significance of the direct negative environmental and social impacts is likely to be small and localized except where the activities are poorly designed. A number of the proposed activities in the subprojects such as small-scale irrigation using surface and ground water, construction/rehabilitation of health facilities, rehabilitation of community roads can lead to impacts on biodiversity, soils and water quality. The environmental screening tools are critical in identifying and mitigating the potential impacts as they relate to different subprojects. 122. Gender Based Violence: Further, in some cases, cash transfers and or cash for work may lead to conflicts within the household that may potentially result in instances of gender-based violence(GBV). Site specific Environmental and Social Management Plans (ESMPs) will specify ways to address potential GBV in subprojects through identification of mitigation measures. At this stage some general approaches and principles are summarized: • Risk Assessment: GBV risks are considered High, Substantial, Moderate or Low and will feed into the overall E&S risk rating of the project. Determining the rating is done jointly by the borrower (through stakeholder consultations) and the Bank by applying the GBV Risk Assessment Tool which considers both project-specific and contextual risks – such as capacity to address GBV, presence of relevant service providers etc. • GBV Action Plan: The action plan should a) Establish mechanisms to address GBV and b) address potential GBV incidents that may arise. Specific plans will be elaborated in ESMPs. • The role of the GRM is limited in GBV-related complaints with focus on three aspects: Document a) the nature of the complaint – without asking further questions, b) Was the perpetrator associated with the project, and c) If possible, obtain age and sex of survivor. All information must be treated as confidential and the GRM operator should be trained on how to approach survivors that must be referred to a safe and ethical GBV service provider. The Implementing Agency and the World Bank should be notified immediately. • Survivor-centered approach: Aims to create a supportive environment in which the survivor’s rights are respected and prioritized and in which the survivor is treated with dignity and respect. 123. Since GBV cases are qualitatively different from other complaints that are typically handled through the grievance redress mechanisms, for example, those related to compensation, etc., the GBV cases need a specific channel for their management and since PSSN is a nation-wide program conditions may vary depending on local circumstances. The above will be more elaborated during 27 project implementation in the event such situations arise. More guidance will also be obtained from the GBV Practice note that has more detailed information. 3.8.5 Cumulative Impacts 124. Some sub-projects may in some areas result in cumulative impacts on the environment. Cumulative impacts are impacts, which may result from individually, small-scale subprojects with minimal impacts but which over time can combine to have a significant impact. Cumulative impacts can also be defined as impacts, which potentially develop from the combined impacts of more than one project or large-scale program occurring within the same area of influence and time span. In such cases, cumulative impacts will have to be assessed based on the combined effects of potential impacts from the various program inputs. 125. Considering possible cumulative impacts of the PWP/ LE sub-projects, stakeholders will be provided with an opportunity to learn how to avoid or mitigate localized impacts from initial subprojects, so that measures can be integrated into subsequent activities. 126. The Project supports diverse types of subprojects in the same community. Some examples of activities related to such sub projects are as follows: a. Potential impacts on surface water, owing to the construction of numerous small-scale irrigation works and potential cumulative impacts on water users (especially downstream users of potential river and streams); b. Potential increase of poaching of wildlife due to expansion of land under cultivation, starting bush fires or increased proximity and access to protected areas through construction of rural community access roads. 3.8.6 Strategic Impacts 127. The location of certain small-scale sub projects such as community access roads, water reservoirs and development of irrigated agricultural activities downstream from small dams might also have strategic impacts. Thus, they require a more detailed assessment in relation to the types of sector policies and land management plans that the Government of Tanzania is advocating (e.g. how many community access roads may fit into the overall transport sector policy in Tanzania). Infrastructure such as community access roads requires an assessment of the location and design to take into account the potential impacts that the road may have on the natural resources (soil erosion, encroachment on protected areas, changes to surface run-off, dust, etc.) and on the social environment (mobility of communities, migration of people, introduction of diseases, etc.). 128. Vulnerability analysis: PSSN II aims at achieving inclusion and will therefore continue to target the poorest and most vulnerable households as it scales-up to full national coverage. By the end of PSSN II, targeted households in all villages in all 187 PAAs across the United Republic of Tanzania will have had access to CTs and (if they have labor capacity) also to PW and basic livelihoods support. In addition, the project will target individuals with specific vulnerabilities and such people include women especially those that head households, the elderly, youth with no jobs or out of school, disabled, etc. For example, under PSSN I the majority (83 percent) of primary recipients of household benefits were women and this focus on women as the main recipient will continue under PSSN II. 28 Similarly, supplementary child and disability grants will be offered only to households that include children or people with disabilities (PWDs). As an incentive, additional variable HCTs will be offered to families with children complying with health and education co-responsibilities. In addition, the number of households reached in each village will be guided by geographical targeting based on poverty maps. Recertification of existing beneficiary households, and efforts to address exclusion errors in existing villages will ensure that the program continues to reach the poorest households. There will be a stronger focus on targeting each element of the project to the households to which it is most suited as well as addressing the vulnerabilities identified: CTs will comprise three types of benefits, layered as follows: (i) A fixed transfer offered to all PSSN households. This transfer will be unconditional only for households with no labor capacity and will be referred to as Direct Support. Households with labor capacity will instead receive a time-limited Productive Transfer, which will be accompanied by soft- conditions in the form of community sessions and savings promotion; these households will receive the productive transfer only until they enroll in public works - once they start receiving PW transfers, the productive transfer will stop. (ii) A fixed transfer for vulnerable groups provided to all households that include a child aged 0-18 years old (Child Grant) and to those that include a person with a disability (PWD) (Disability Grant). Households that include both a child and a PWD will receive both types of grant. Public Works: Public Works however will be offered only to those households with labor capacity (including at least one member aged 18-65 years able to work); households with just one worker where that worker is pregnant or caring for an infant will receive PW wages but be granted a temporary waiver from the need to work. Livelihoods support: The basic livelihoods support will be offered to all PSSN II households with labor capacity, whilst the enhanced livelihoods package will be offered to 200,000 selected households that have labor capacity and live in the 44 poorest PAAs. 3.8.7 Other Social and Environmental Degradation Issues 129. Other issues, which need to be addressed under the Program are the issues of pollution, land degradation, and sensitivity to vulnerable groups. (i) Potential Sources of Pollution 130. With respect to sub-projects to be financed by the Program, there is a possibility that development of social and economic infrastructure can lead to pollution of watercourses from increased generation of solid waste and wastewater due to inadequate attention being paid to inclusion of proper sanitation facilities. 131. Subprojects to be implemented under PW are expected to be of small scale and will encourage use of organic manure and compost fertilizers, and integrated pest management while discouraging 29 reliance on chemical pesticides. However, in the event of tree planting or horticultural subproject that may require application of agrochemical for instance, to address a significant pest invasion, the PAA Sector Expert will advise based on prevailing situation of the incidence, whether being a localized one or an epidemic situation affecting large area. In a situation and when use of pesticides will be inevitable, the project will be advised to apply biodegradable pests control materials in accordance with the requirement of the Pesticide Management Act of 2013, which advocates for safer alternatives to existing pesticides as per latest global research and development without compromising the importation of biological control agents. Through the guidance of the Agricultural or Forestry Extension office at PAA, screening of suitable pesticides will be carried out in compliance with the Pesticides Control Regulations GN 193 of 1984, which aims to: (i) ensure the effectiveness of pesticides used in Tanzania for the production of food and fibre and for the protection of public health and safety: (ii) protect against possible harmful effects of pesticides including: (a) impairment of the health of persona handling pesticides or using or consuming products or substance treated with pesticides; (b) impairment of the health of domestic animals including honey bees from direct application or pesticides or from the consumption of plant or animals treated with pesticides (c) damage to cultivated plants from direct application or pesticides or from persistent soil residues and (d) damage to the natural environment including impairment of the health of wildlife and contamination of waterway lakes and other water bodies. (ii) Impact on Ecological Resources and Land Degradation 132. Some of the proposed activities and sub-projects can lead to both localized and cumulative impacts on such areas as bio-diversity, lowlands, forests, soil and water quality, etc. Land degradation due to sub-projects that involve construction, deforestation, and induced impacts associated with small-scale community access roads, or any development that induces concentration of people, agriculture or livestock in particular areas. The environmental and social screening tools presented in this framework will be used to identify and mitigate the potential impacts discussed as they related to certain types of community investments. 3.9 Training and Capacity Building 133. Capacity building and training for environmental and social management is required for all levels of implementation of the Program. A safeguard unit has been established at TMU to coordinate and oversee the implementation of environmental and social safeguard policies, monitoring, reporting and capacity building. 134. Safeguard staff at the national level whose role is to oversee overall implementation of safeguard activities across the program will continue to provide safeguard training to enhance the local capacity. At LGA the designated local safeguard staff (District Environmental officer, Ward Environmental officer and Village Environmental officer) will work in collaboration with the national safeguard team to address capacity gaps on safeguard issues at the local level. The national safeguard team should further strengthen monitoring of safeguard implementation and compliance to enhance local capacity. Some of capacity building activities will include safeguard training, application of health and safety measures to community workers such as use of personal protective equipment (PPE) in public works and other manual labor activities. 30 135. Specifically, the safeguard unit is responsible for: i. Ensure compliance of environmental and social issues emanating from Project intervention. Capacity building for PAAs facilitation team on the requirements of the ESMF ii. Provide technical backstopping to PAAs Environmental Management Officer on the compliance of the safeguard policies iii. Review monitoring reports submitted by the PAAs for compliance with safeguard policies Regular Monitoring of potential impacts 3.9.1 Training at PAA level 136. At this level, PAAs facilitators will be trained on environmental and social policies that have been triggered. PAAs facilitators will be a multi-disciplinary team of experts who will support communities in subproject planning, design, implementation, monitoring and evaluation. Objectives of the training will be: ➢ Support communities to carry out environmental and social assessment for each sub-project that have been identified. ➢ Ensure that PAAs have the capacity to assist communities in preparing sub-project proposals, to appraise, approve and supervise the implementation of sub-projects; and ➢ Strengthen the capacity of local NGOs and other services providers to provide technical support to communities in environmental and social aspects of the sub-projects. 3.9.2 Budget for Mainstreaming, Capacity Building and Training 137. The implementation will be undertaken in a way whereby existing training capacity at all levels will be used. Since the government, PAAs other projects and programmes also supports other on- going related interventions, the Program will aim to fill capacity gaps to be identified by the assessment. 138. Furthermore, in order to avoid unnecessary duplication of efforts, the budget for environmental and social concerns will mainly be mainstreamed in the relevant activities and sub projects. For instance, identification of capacity gaps and training needs assessment will be conducted for all other interventions concurrently, including environmental and social management. Similarly, sensitization on environmental and social management will be budgeted for under Development Communication, and as such may not require to be budgeted for separately. 3.10 Monitoring and Evaluation of ESMF 139. Monitoring is an ongoing activity during the life of a project. Through monitoring, it is possible to determine project progress that has been made in relation to the work plan. Monitoring helps to determine whether a project is on track and if any of its strategies or activities needs to be changed so that it can be successful project. On the other hand, evaluation determines how successful a project 31 has been in meeting its objectives. It also helps assess the impact of the project activities on the desired outcome, like enhancing knowledge. 140. The objective for monitoring and evaluation plan is two-fold. a. To alert program authorities and to provide timely information about the success or otherwise of the Environmental and Social Management process outlined in this ESMF in such a manner that changes can be made as required to ensure continuous improvement to the process. b. To evaluate the performance of the ESMF by determining whether the mitigation measures designed into the sub project activities have been successful in such a way that the pre- program environmental and social condition has been restored, improved upon or worse than before and to determine what further mitigation measures may be required. 3.10.1 Monitoring and Evaluation Indicators 141. A number of indicators will be used in order to determine the status of environmental and social safeguards issues emerging from subproject implementation. The implemented subprojects will be monitored through a subproject implementation completion report which is submitted after PW season. Annex 8 is indicating the report format for subproject completion report. 142. The following are some parameters and verifiable indicators to be used to measure the ESMP process, mitigation plans and performance. ▪ Number of CMC, Village Governments/Shehia Advisory Council/ Mtaa Committee trained in environmental and social safeguards. ▪ Number of PAAs Facilitators trained in environmental and social management procedures. ▪ Number of subprojects implemented on Public owned land ▪ Number of subprojects implemented on Privately owned land ▪ Number and type of subprojects that have been screened for environmental and social issues, using the screening form and checklist. 3.10.2 Monitoring Roles and Responsibilities 143. The successful implementation and monitoring of the environmental and social management framework, environmental monitoring would depend on collaboration of different stakeholders at all levels. (a) Community level 144. Community Management Committee (CMC) in conjunction with Village/Mtaa Environmental Committee and with support from Village Council/Mtaa/Shehia Advisory Council Committee will monitor the environmental and social impacts and ensure mitigation measures are implemented. They will also maintain suitable records to be made available to their respective PAAs experts. (b) District council level 145. The PAA Environmental Officers in collaboration with PAAs Management Team have a supervisory monitoring role to ensure that the mitigation measures indicated in the ESMP are being 32 implemented. The PAAs EMO will prepare monitoring report and submit to RAS/TMU on quarterly basis. (c) National level: 146. At National level, the National Steering Committee (NSC) and TMU in collaboration with the Sector Experts Team (SET) will ensures that sub projects designs conform to different technical sector norms and standards. TMU will also be responsible for appointing a consultant to review the environmental and social issues including assessment of cumulative impacts on periodic basis. The reviewed reports will be shared with World Bank and other stakeholders. The Program will as well implement other standards on safeguards namely the ESS 3, ESS4 and ESS6 though not to a high level as compared to ESS 1, ESS 2, ESS 5, ESS 7, ESS 8 and ESS 10. The ESS 3 on Resource Efficiency and Pollution Prevention and Management will be focusing on areas potential for causing pollution and set mitigation actions based on mitigation hierarchy which include avoiding, minimizing or treating generated waste as a pollution control measure. The Program will ensure adherence to PW Handbook which provides for the norms and standards for a site setting procedure. The PW Handbook requires a site be arranged to have waste disposal and management facility, sanitary facility and avoid any potential site contamination activity during subproject implementation. For every PWP subproject implementation site, the following will be observed to prevent and manage pollution to soil, water and general environment: • Provision of temporary sanitary facilities for both male and female laborers • Waste collection pit for bio-decomposable wastes, and collection point for non-biodegradable waste such as plastic containers, plastic bags and packaging materials • Agrochemical handling and storage point. This will be selected through the assistance of Sector Expert to reduce potential contamination to soil and water courses. The agrochemical storage point will be well secured, place where no water, runoff can be impounded and roofed to protect direct rainfall to stored agrochemicals. Other potential pollution sources include the application of excessive agrochemicals to gardening and horticulture activities. This will be mitigated through training to LSP who will supervise horticulture and agriculture-related subprojects on how agrochemicals will appropriately be applied. Most of horticulture and gardening activities will be undertaken in a small scale and for a relative short period, hence it is anticipated that there will be no or minimal use of agrochemicals in subprojects under the Program. Since excessive use of fertilizers could load nutrients into water bodies thus resulting into eutrophication affecting natural ecological systems, avoidance of excessive application of agrochemical (pesticides, herbicides, synthetic fertilizers) and organic manure will be highly emphasized. The PAAs will be urged to avail Sector Experts in advising subprojects implementation whenever and wherever the need will arise. The ESS 4 on Community Health and Safety will guide the Program implementation through mitigating potential health effects associated with subprojects activities. There are possibilities or instances where subprojects may pose health risks and/or accidents to communities within its vicinity. measures to execute in ensuring safety of the general community, will be implemented under the 33 guidance of LSP, CMC, and Sector Experts. Such safety measures will be subprojects specific to suit implemented activities and operations, for instance fencing the subproject premises as appropriate, provision of caution notices where applicable and set rules on Best Environmental Practices (BEPs) and Standards Operation Procedures (SOPs) such as provision of safe access to services the created asset offer, and awareness creation to community on sanitation principles through community meetings. On ensuring that assets created through implementation of PWP subproject will be safe to the community, community health and safety measures will be applied to all subprojects and will be prioritized according to the nature and type of subproject identified by the community. Sector Experts of respective PAA will provide guidance to communities on appropriate and more suitable safety measures for identified subproject using Environmental Checklist which has been prepared based on Subprojects Sectors on Annex 7. The ESS 6 on Biodiversity Conservation and Sustainable Management of Living Natural Resources will guide Program operations to subprojects with activities affecting natural biodiversity and ecological sensitive sites. With reference to nature of subprojects under the Program, it is anticipated that most of them will be implemented on undisputed land which is not a biodiversity conservation reserve, ecological sensitive areas or specific environmentally sensitive places such as wetlands, forest reserves, national parks etc. during the screening on subprojects, the issues on biodiversity conservation will be considered, and halt all subprojects with potential significant negative effects to biodiversity conservation. The site selection will be done during the subprojects microplanning stage, when a PAA Sector Expert is involved to assist the community on selection of appropriate site based on proposed subproject. The selection of subproject site will ensure conservation of biodiversity of specific area by avoiding such ecologically sensitive sites as national parks, breeding sites of endangered bird, vertebrates and animals, wetlands and fragile ecosystems and places with rare species. Chapter 5 on cultural heritage management plan section 5.4 highlight key areas with ecological sensitivity, which will not be involved in subprojects implementation. These include National Parks, Game Reserve Areas and Protected Forest Reserves. Among the prime national parks and game reserves include Ngorongoro Crater, Ruaha National Park, Selous Game Reserve, Serengeti National Park, Gombe National Park, Katavi National Park, Lake Manyara National Park which is a prominent lesser flamingoes breeding place and Tarangire National Park. The Tanzania map indicating national parks and reserved areas is as seen on Annex 17 34 CHAPTER 4: LABOUR AND WORKING CONDITIONS 4.1 Introduction 147. Environment and Social Standard 2 (ESS2) of the World Bank recognize the importance of employment creation and income generation in pursuit of poverty reduction and inclusive economic growth. The Program will promote sound worker-management relationships and enhance the development benefits of a project by treating workers in the project fairly and providing safe and healthy conditions. 148. The Occupational Safety and Health Act, No. 5 of 2003 and Employment and Labour Relations Act, No. 8 of 2006, both have relevant clauses that support ESS 2. Act No 5 of 2003 make further provisions for securing the safety, health and welfare of person at work; it protects workers against risks to safety or health in connection with the activities of persons at work. 149. The legislation requirements conform to guidance provided in WB Environmental and Social Framework (ESF) and Environmental and Social Standard 2 (ESS 2). 4.2 Objective 150. The main objective of Labour and Working Conditions (LWC) is to promote sound workers- management relationships and enhance the development benefits of a project by treating workers in a project fairly and providing safe and healthy working conditions. 151. The specific objectives are as follows: i) To promote safety and health at work, ii) To promote the fair treatment, non-discrimination and equal opportunity of project workers, iii) To protect project workers, including vulnerable workers such as women, persons with disabilities, children (of working age, in accordance with ESS 2) and migrant workers, contracted workers, community workers and primary supply workers as appropriate, iv) To prevent the use of all forms of forced labour and child labour, v) To support the principles of freedom of association and collective bargaining of project workers in a manner consistent with national law, and vi) To provide project workers with accessible means to raise workplace concerns. 4.3 Rationale for Labour and Working Conditions (LWC) Procedures 152. Implementation of the programs sub-components Public Works Program and Productive Inclusion will result into impact of varying nature and degree depending on the situation at hand of the social, economic, administrative and environmental equilibrium in the respective communities. Although, these subprojects at a large extent include the use of community in a number of different circumstances where as subprojects are designed and conducted for the purpose of fostering community – driven development and providing a social safety net. The foreseen impacts to the 35 communities’ raises the importance of addressing LWC issues adequately. This entails use of relevant ESS 2 provision to put in place a suitable LWC procedure that will provide guidance to communities in addressing LWC issues and control of unwanted incidents. 153. As stated above, the purpose of LWC is to provide guiding principles for assessment and management of all physical works targeted under the Program. It will help to systematically identify, predict and evaluate beneficial and adverse LWC impacts of subprojects to be financed under the project as well as identify the terms and conditions on which community labor will be engaged, including amount and method of payment and times of work. This procedure will also identify the way in which community workers can raise grievances. General ESHs requirements will be applied by this project. 4.4 Scope of application 154. The applicability of LWC as stipulated in ESS2 is established during the environment and social assessment described in ESS1. There are different types of employment relationship between the PSSN II project and the project workers: These are: i) Direct workers employed directly by the project implementing agency ii) Workers employed by PAAs iii) People engaged to provide community labour (Community labour). 155. All government civil servants working in connection with the project, whether full-time or part– time, they will remain subject to the terms and conditions of the existing publicsector employment agreement as per Employment and Labour Relations Act No. 8 of 2006. ESS2 will not apply to such government civil servant except for the provision of paragraph 17 to 20 (Protecting the work force) and Paragraphs 24 to 30 (Occupational Health and Safety). 4.5 Working Conditions and Management of Worker Relationships 156. This section discusses the procedures applicable to the Program. They will set out the way in which project workers will be managed, in accordance with the requirement of the national law and ESS2 during review and approval of subprojects under the Program. Application of ESS2 promotes the implementation of a systematic approach to improving the management of risks and impacts related to labor and working conditions in Program and respective Sub projects. 157. This section gives a description of roles, reporting and advice mechanisms during implementation of the Program. 4.5.1 Labour Management Procedure 158. Various laws, policies, systems, standards and international good practice codes are applicable to the implementation of this Plan. These laws include National Law Employment, Occupational Safety and Health Act, No. 5 of 2003 and Employment and Labour Relations Act, No 8 of 2006, both 36 have relevant clauses that support ESS 2. Act No 5 of 2003. Project workers will be provided with information that is clear and understandable regarding their terms and condition of employment. The Labour Management Procedures are presented as a separate document (LMP). 4.5.2 Terms and conditions of engagement 159. There are two types of workers in the Program: (i) those from the government at PAA level and TASAF Management Unit (TMU) who have contracts that are governed by the National Labour Employment Act and (ii) community workers who will be working in the Program following rules as agreed in the respective sub-components handbooks of PWP and PI including payment amount, method of payment and hours of work. Only participants enrolled in the programme will be allowed to work in PWP and PI subprojects. Payment and working conditions will be clearly identified and communicated to the enrolled beneficiaries of poor households. 4.5.3 Grievance Redress Mechanism (GRM): 160. A mechanism will be put in place to specify the way in which community workers can raise their grievances. Detailed mechanism is shown in GRM section (chapter 6). 4.5.4 Occupational Health and Safety (OHS): 161. According to the Occupational Health and Safety Act of 2003 Part IV para 43 Safety provision; Part V para 54, 55 and 58 Health and Welfare Provisions; Part VI para 61 (1a), 63(a, b), 65 special provisions, all these describes procedures to be followed to ensure workers safety. Furthermore, they make provisions on safety, health and welfare of persons in factory and other places of work; to provide for the protection of persons other than persons at work against hazards to health and safety arising out of or in connection with activities of persons at work. 162. Measures relating to OHS are for protecting workers from injuries, illness or impacts associated with exposure to hazards encountered in the work place or while working. Such measures take into account the requirement of ESS2 and national law requirements on OHS and work place conditions. Workers will be provided with protective gears appropriate to the circumstances of their work as advised by Sector Expert, most common PPE are as shown in Annex 10. 163. Community workers. PSSN II will support sub-projects related to Public Works Program incorporating targeted infrastructure and Livelihood interventions. The type of subprojects to be supported will be identified by the communities after undergoing a participatory planning process (community-driven bottom up approach). Health and safety risks and measures to address them will be discussed during the participatory planning process. 164. The health and safety risks to which the community workers may be exposed from each type of subproject will be assessed, as well as the ability to prevent or eliminate such risks or, if the risk cannot be prevented or eliminated, the ability to protect community workers from exposure. 37 4.5.5 Duty allocations – women, elderly, people with disability, pregnant women 165. ESS2 recognizes that appropriate measures should be provided to protect and address vulnerable, including specific groups such as women, people with disabilities and children. However, the Program has provided equal right for both man and women participating in the project. Pregnant women and lactating mothers (0-24 months) will not be working as well as elderly above 65 years old. No children below 18 years old will be allowed to work. 4.5.6 Institutional arrangement: 166. In order to ensure successful implementation of LWC there is a need to clearly define roles and responsibilities of key players and stakeholders at Community, PAA and National levels. The LWC plan should provide a specific description of institutional arrangements, i.e. who is responsible for carrying out the mitigation and monitoring measures (for operation, supervisions, enforcement, monitoring of implementation, remedial action, financing, reporting and staff training). • National level- will prepare guidelines and all forms needed, capacity building to PAAs staff and monitoring; ensure provision of expert advice on LWC process, ensure enforcement and monitoring role as stipulated by law, ensure periodical labour and working conditions environmental audits and facilitate in conducting training for staff that will carry out LWC plan at PAA level. • PAA level - The PAA Environmental Management Committee, which includes designated PAA Environmental Officer as Secretary and the PSSN Coordinator will be responsible for checking the completeness of Risk Assessment and Management Forms. This will enable them to identify and mitigate the potential environmental and social impacts of sub projects. They will be responsible for training of PAA facilitators, CMCs and Village leadership, filling of forms required, prepare quarterly monitoring reports; • Village level - After training members of the VC and CMC, they will undertake both compliance monitoring and effects monitoring (which records the consequences of activities during implementation). 167. During the planning phase, community members will participate in the identification of indicators for monitoring the mitigation measures. 168. During implementation phase, monitoring the execution of works with respect to LWC, CMC are responsible for the implementation of most of the mitigation measures, including safe disposal of hazardous wastes. 169. During operation and maintenance phase, the overall environmental monitoring and alerting on any emerging safety and hazards in conjunction with the ongoing sub project activities. The communities will be enabled to present their observations and concerns through the acceptable 38 mechanisms including, but not limited to the Village/Shehia Environmental Committee to the PAA Management Team and higher authorities. 4.5.7 Risk Assessment: 170. Potential risks that may arise from the nature of activities to be undertaken include: child labour, forced labour, accident and injuries, safety and health hazards. The Program will have to address these risks in a systematic manner as outlined in the provided forms as attachment (Annex 11). 4.5.8 Mitigation: 171. Based on the environmental and social impacts and risks identified from the use of the checklists, the LWC Plan will describe technical details of each mitigation measure, together with designs, equipment, descriptions and operating procedures as appropriate. 4.5.9 Monitoring: 172. Good monitoring and reporting procedures are necessary to ensure early detection of conditions that necessitate particular mitigation measures and to furnish information on the progress and results of mitigation. The LWC have included monitoring procedures that specify the type of motoring activities that will be linked to the mitigation measures as depicted in ESCP. These include the following: • Confirm compliance in terms of national laws and ESS2 requirements • Assess actual impacts against predicted and the mitigation measures, • Document implementation procedures and effectiveness of management 173. Monitoring will be undertaken by different stakeholders working in the PSSN II project including TMU staff, PAA staff, and village council and community workers, through desk review and field inspection to confirm that listed mitigation measures are being implemented effectively to achieve the intended outcomes. 4.5.10 Budgets and Costs Estimate: 174. Budget and cost estimates for implementation of this LWC will be included in the overall Program budget. The budget should be for mitigation measures and recommended activities. The mitigation and monitoring measures recommended in the LWC will be developed in consultation with all affected groups to include their concerns and views in the design of the LWC Plan. 39 CHAPTER 5: CULTURAL HERITAGE PROTECTION PLAN 5.1 Introduction 175. The implementation of the Program will cover all areas of the country, addressing poverty to citizens with different cultural backgrounds and norms. The Program implementation is seeking to conserve and protect tangible and intangible cultural heritage of communities it serves, ensuring poverty eradication activities do not intervene efforts to promote and practice conservation of culture and protect community heritages. This chapter focus on Cultural Heritage Protection as required in ESS8 of ESF. 5.2 Policies and legal frameworks 176. The key policies and legal frameworks are on both; the national legislation and ESF requirements. 177. The legal protection of Tanzania cultural heritage resources is implemented through Antiquities Act of 1964 (Act No. 10 of 1964 or Cap 333 Ref. 2002) which is the principal legislation and the Antiquities (Amendment) Act of 1979 (Act No. 22 of 1979) as well as Rules and Regulations of 1981, 1991, 1995 and 2002. The 1964 Act, offers general protection to objects or structures, which are of archaeological, paleontological, historic, architectural, artistic, ethnological or scientific interest. Also operates by using the National Antiquities Policy of 2008, in which roles and responsibilities of different actors and stakeholders of cultural heritage resources have been clarified. 178. The Division of Antiquities is a statutory body within the Ministry of Natural Resources and Tourism responsible for conservation, preservation, protection and management of cultural heritage resources in Tanzania. Tanzania is well endowed with abundant significant cultural heritage resources which range from the Pliocene period about four million years ago to present time which are: Historical sites, Historical towns, Traditional Settlements, Historic Buildings, Sites with special memories, Archaeological or Paleontological sites, and Natural Features and Structures. 179. The Division also operates by using the National Antiquities Policy of 2008, in which roles and responsibilities of different actors and stakeholders of cultural heritage resources have been clarified. The important feature of this policy include elaborations of roles of the public, individuals, corporate and institutions in managing cultural heritage resources; analyze ways in which cultural heritage activities will be managed and administered; clearly clarify measures through which cultural heritage resources shall be protected, managed, preserved, conserved and developed; and analyze the best practices for conducting research and conservation of cultural heritage resources. 180. Despite of the Nation being reach in heritage resources, only sixteen (16) are managed and controlled by the Central Government under the Antiquities Division. 40 181. According to currently available research findings show that Tanzania has 128 areas which have been published on the National Gazette, though there are more than 500 areas recorded to have significance of cultural heritage resources (source: Ministry of Nat Res & Tourism, 2017). 5.3 Objective of addressing Cultural Heritage Issues 182. The objective of addressing Cultural Heritage issues is to ensure that cultural values of communities is retained irrespective of how less strong their culture may be. It is also seen that such heritage sites with tangible cultural marks being in urban or rural area are conserved for present and future generation. The Program implementation will in no way jeopardize the existence of cultural heritage of any for, tangible or intangible by ensuring adequate Stakeholder Engagement process throughout Program phases, i.e. design, implementation and monitoring of resulted outputs. However, in case of chance finds of physical cultural resources during implementation of project activities, a chance finds management plan will be prepared and implemented as part of the Environmental and Social Management Plan (ESMP). 5.4 Key areas of focus 183. On tangible national heritage that would need conserved include those internationally recognized by international organs such as UNESCO. Specific sites are considered to be global heritage sites that require utmost level of conservation, despite co-existence nature of tangible heritage and surrounding communities. The PSSN II will have different activities undertaken throughout the country, including to areas where these heritages exist. Among the sixteen (16) sites inscribed on the World Heritage list include Kondoa Rock Art site, the Ruins of Kilwa Kisiwani and Songo Mnara, and Olduvai Gorge. The areas recognized by UNESCO as world heritage with year of recognition in brackets include; 5.5 Ngorongoro Conservation Area (1979) 184. A large permanent concentration of wild animals can be found in the huge and perfect crater of Ngorongoro. Nearby is the crater of Empakaai filled by a deep lake and the active volcano of Oldonyo Lenga. Excavations carried out in the Olduvai Gorge, not far from there, have resulted in the discovery of one of our more distant ancestors, Homo habilis. Laitoli Site, which also lies within the area, is one of the main localities of early hominid footprints, dating back 3.6 million years. 5.6 Serengeti National Park (1981) 185. The vast plains of the Serengeti comprise 1.5 million ha of savannah. The annual migration to permanent water holes of vast herds of herbivores (wildebeest, gazelles and zebras), followed by their predators, is one of the most impressive natural events in the world. 5.7 Ruins of Kilwa Kisiwani and Ruins of Songo Mnara (1981) 186. The remains of two great East African ports admired by early European explorers are situated on two small islands near the coast. From the 13th to the 16th century, the merchants of Kilwa dealt 41 in gold, silver, pearls, perfumes, Arabian crockery, Persian earthenware and Chinese porcelain; much of the trade in the Indian Ocean thus passed through their hands. The area is also famous with ‘Swahili’ culture, which has Arabic descent. 5.7.1 Selous Game Reserve (1982) 187. Large numbers of elephants, black rhinoceroses, cheetahs, giraffes, hippopotamuses and crocodiles live in this immense sanctuary, which measures 50,000 sq. km and is relatively, and also significantly undisturbed by anthropogenic activities. The park has a variety of vegetation zones, ranging from dense thickets to open wooded grasslands. 5.7.2 Kilimanjaro National Park (1987) 188. At 5,895 m, Kilimanjaro is the highest point in Africa. This volcanic massif stands in splendid isolation above the surrounding plains, with its snowy peak looming over the savannah. The mountain is encircled by mountain forest. Numerous mammals, many of them endangered species, live in the park. 5.7.3 Stone Town of Zanzibar (2000) 189. The Stone Town of Zanzibar is a fine example of the Swahili coastal trading towns of East Africa. It retains its urban fabric and townscape virtually intact and contains many fine buildings that reflect its particular culture, which has brought together and homogenized disparate elements of the cultures of Africa, the Arab region, India, and Europe over more than a millennium. 5.7.4 Kondoa Rock Art Sites (2007) 190. Kondoa Rock Art Sites, on the eastern slopes of the Masai escarpment bordering the Great Rift Valley are natural rock shelters, overhanging slabs of sedimentary rocks fragmented by rift faults, whose vertical planes have been used for rock paintings over at least two millennia. The spectacular collection of images from over 150 shelters over 2,336 km2, many with high artistic value, displays sequences that provide a unique testimony to the changing socio-economic base of the area from hunter-gatherer to agro-pastoralist societies, and the beliefs and ideas associated with them. Some of the shelters are still considered to have ritual associations with the people who live nearby reflecting their beliefs, rituals and cosmological traditions. 191. On the other hand, the nation is formed of about 120 different ethnic groups with respective geographical locations, unique culture and means of communication. The groups undertake varying economic activities based on cultural backgrounds, location and climate. Most of the common socio- economic activities of these communities include farming and livestock keeping. There are groups engaging in hunting and gathering of fruits, roots and herbs, and those engaging into nomadic pastoralism. The groups were thoroughly consulted in a free and prior informed consultation to ascertain their engagement into PSSN II activities. Reference should be drawn from consultation of VGPF as addressing ESS7. 42 192. The PSSN II Program will have activities in these PAAs having tangible and non-tangible cultural heritages where participants will be trained on application of suitable means of its management. 5.7.5 Potential adverse Impacts on Culture Heritage of communities 193. A number of adverse socio-cultural impacts are predicted that may be caused by the implementation of the Program. The most obvious ones include: i. Change of socio-economic activities of group in the program, hence loss of culturally- originated economic activities ii. Loss of cultural diets supplements obtained from fruits and roots from forests as the communities will shift from hunter – gatherer groups to food purchasing communities. 194. It is therefore planned to have comprehensive monitoring plan on positive and negative impacts of the Program during its implementation. An awareness raising sessions is vital towards educating communities retaining cultural values as it benefit from the Program implementation. This will be achieved through distribution of awareness raising materials to different communities promoting safeguarding cultural values and heritage. 195. On the other hand, national and global heritage may be impacted by the Program through implementation of some PWP, and PI activities depending in areas of implementation. Subprojects involving livestock keeping, agricultural activities, afforestation and bee keeping would require special technical and expert advice prior to its implementation to establish its feasibility in respective area. 5.8 Cultural Heritage Management and Monitoring Plan 196. A comprehensive cultural and heritage management and monitoring plan will be developed for the Program as pointed out in Environment and Social Commitment Plan (ESCP). The Cultural Heritage Management Plan will focus to address conserving key elements of specific cultural heritage which is believed to be impacted by project activities, and if not safeguarded may get extinctic or significantly altered. 43 Figure 4: Cultural Heritage Management and Monitoring Plan 1. Identify subproj ect implementatio n location 5. Incorporate cultural 2. Undertake preliminar heritage mitigation m y assessment to identify easures into ESMP du cultural heritage threats ring subproject imple may be posed by the sub mentation project implementation 4. Prepare cultural heritage monitori 3. Prepare mitigati ng plan to monitor on measures for id implementation of entified cultural th mitigation measur reats es 44 CHAPTER 6: STAKEHOLDER ENGAGEMENT PLAN AND INFORMATION DISCLOSURE 6.1 Introduction Summary of PSSN II Program Description 197. The Government of the United Republic of Tanzania is in preparation to implement Second Phase of Productive Social Safety Net (PSSN II) The Project aims at protecting the poor from immediate effects of poverty, helping them to meet consumption needs and prevent further irreversible losses in assets, and enable poverty-stricken households to invest in their future and improve their livelihood. The Project Development Objective (PDO) is to improve access to income-earning opportunities and social economic services for targeted households below the poverty line while enhancing and protecting the human capital of their children. 198. Activities under the Project will be implemented through, two main components (i) Productive Household Support; (ii) Institutional Capacity Strengthening and Integrated Delivery Systems. In accordance with ESS10 a Stakeholder Engagement Plan (SEP) has been prepared. The SEP has been prepared as a separate document and summarized below. Summary of PSSN I Stakeholder Engagement Activities 199. Targeting and Enrolment is the foremost Program activity implemented immediate after its commencement. Prior to cash transfer to the enrolled beneficiary’s households, two major activities of targeting and enrollment were carried out in all selected Villages/Mtaa/Shehia. During these two activities, PAA facilitators were all trained using standard package of guidelines focusing on targeting and enrolment process at the community level. The key activities involved in the process included awareness creation to the communities on the program objectives, components to be implemented, benefits level, entitlements and responsibilities as well as anticipated results. After community sensitization, each Village Assembly meeting set up criteria for identification of poor households according to their local situation. The set criteria were used to target poor households that will benefit from the program. Community teams were formed amongst community members and others who were conversant with families residing in the respective community. These were used to identify poor households in the respective community. Names of identified poor households were first discussed in the Village Council and thereafter were read in front of the general village assembly. The Village assembly was mandated to endorse, add, reject and validate the names. Since Kiswahili was widely used to explain key program features, translators were designated to translate into local language for ease of grasping and understanding. 200. Community targeting, and enrolment were the most important steps of the project entry at the Village level. Village assembly meetings were held and involved every group in the community including the vulnerable communities. This was an important step towards inclusion of eligible program beneficiaries including vulnerable groups, where names of all poor households were read. This helped in minimizing inclusion and exclusion errors. 45 6.2 Stakeholders identification and analysis 6.2.1 Affected parties 201. The Project will identify individual, groups, local communities and other stakehoders that may be directly or indirectly affected by the project either positively or negatively. Stakeholder Engagement Plan (SEP) focuses particularly on those communities that are directly and adversely affected by project activities. All community members in the villages will be affected during implementation of the Project because by implementing the project they will have either direct or indirect impacts. The consultation with the affected people will be held in the villages through special assembly meetings. These meetings will be organized by the Village Councils whereby its members have been informed the objectives of the meeting. This will enhance the attendance of many community members in the meetings. 6.2.2 Other interested parties 202. Other interested parties will include institutions that are working in villages; this will include PAA officials, village leaders and Civil Society organizations that are working with the affected communities. These groups will have a role to play and also will have a broader knowledge of the environmental and social characteristics of the project area and the nearby populations even if they are not directly affected 6.2.3 Vulnerable Groups 203. These refer to those who are likely to be adversely affected by project impacts and /or are limited than others in their ability to take advantage of Program benefits. Such individuals or groups are susceptible to exclusion from, and/or are unable to fully participate in the mainstreaming consultation process and as such may require specific measures and assistance to ensure adequate inclusion in Program activities. VGs include hunter-gatherer communities, pastoralist, agro-pastoralist groups and those communities with limited access to social services due to geographic and infrastructure-related constraints. In addition, other vulnerable groups not described under ESS7 include women, especially those heads of households, youth, elderly, people with disabilities, people at risk of being excluded because of social bias and people with chronic illnesses. 6.2.4 Summary of project stakeholder needs 204. The following table summarized the potential needs of each individual stakeholder group, indicating key characteristics and corresponding specific need. 46 Table 2: Summary of stakeholders needs Stakeholder Key characteristics Language needs Preferred Specific group notification needs means Affected Community members in National Letters from PAA Depends on parties the specific area who are language to the Village and the specific permanent residence in (Swahili). Local sub village leaders communities the area. language may be Traditional needed. notifications Translator in (Mbiu) case local language translate needed Other These are government National Letters, telephone Working interested and non-governmental language and emails equipment parties institutions working (Swahili) and such as with the affected parties English computer and have in-depth knowledge of environmental and social characteristics of the affected parties Vulnerable These are hunter- National Letters from PAA Consultation Groups gatherer, pastoralist, and language to the Village and with local agro-pastoralist (Swahili) and sub village leaders. leaders communities. their local Traditional language. notifications Translator (Mbiu) needed 6.2.5 Stakeholders Engagement Plan 205. Open and transparent engagement among Program stakeholders can improve the environmental and social sustainability of subprojects, enhance Program acceptance and make a significant contribution to successful Program design and implementation. During implementation of the Program different stakeholders (individuals or groups) that are likely to be affected by the Program will be consulted in order to foster a strong, constructive and responsive relationship which is important for successful management of environmental and social risks. Stakeholders to be involved as per nature, scale of the project, its potential risks and impacts will include project participants, members of communities residing in the villages where project will be implemented and sector experts at all levels. Annex 12 details the stakeholder’s engagement plan. 47 6.2.6 Purpose and timing of stakeholder engagement program 206. The stakeholders’ engagement plan will describe the timing and methods of engagement with stakeholders during targeting and recertification and throughout the life cycle of the sub project i.e. from, identification of sub projects, planning, implementation and decommissioning of sub projects. Further the engagement plan will identify timings in which information regarding the sub project will be communicated to stakeholders and type of information to be gathered for stakeholders. Information gathering, and sharing will be crucial in the plan for each party involved to know what is expected of them and the outcomes of sub projects at a particular point in time. This will guarantee knowledge exchange and effective participation of the stakeholders who will ultimately make informed choices on the project being implemented. 207. Information will be communicated through community meetings, distribution of communication materials such as posters and fliers addressing issues around sub projects being implemented. Use of local languages in community meetings through interpreters will be necessary to ensure that participants fully understand what is being communicated to allow full participation in terms of voicing their views and seeking clarification when in doubt so as to institute measures to remove obstacles to participation. Needs of specific groups with specific information needs such as disability, gender and mobility will be accommodated to ensure they are equally informed. 6.2.7 Proposed strategy for information disclosure 208. Information will be disclosed through public consultation and made available in brochures, leaflets, or booklets, using both English and national language. Summaries of the Stakeholders Engagement Plan will be made available in hard copies and in national language at PAA offices and any other local level public offices. Electronic versions will be available on the official website of TASAF and the Bank website. Information to be disclosed to participants will include (i) The purpose and nature of the sub project to be implemented, (ii) duration of proposed activities, (iii) potential risks and impacts of the project to local communities and mitigation measures. Also, disclosure of information will include how stakeholders’ will participate by developing meeting schedules, venues and procedure for receiving and addressing grievances. For the vulnerable groups information will be made available to the affected vulnerable groups in an appropriate form and manner. 6.3 Proposed strategy for consultation 209. Consultation process is the dynamic process of dialogue between stakeholders based upon a genuine exchange of views, with the objective of influencing decisions, policies or programs actions. The process involves listening to all stakeholders’ opinions sincerely, respecting all participants, showing interests in their knowledge, and behaviors while encouraging them to share their knowledge and ideas. The following methods will be used for stakeholder’s consultation at the community level; Discussion with key informants at all levels, Guided Focus Group Discussions and Special village assembly meetings. 48 6.3.1 Proposed strategy to incorporate the view of vulnerable groups 210. The Program will use Vulnerable Group Plan (VGP) to ensure inclusion and meaningful participation of vulnerable group in the Project design, planning and undertaking of planned activities to enhance development process with full respect to dignity, human rights, economies, and culture of Vulnerable Groups. In this connection VGP for sub-projects have been prepared through a highly participatory, flexible and pragmatic process using participatory planning based on the findings of stakeholder’s engagements conducted. The PAAs facilitators, in consultation with VGs in their respective areas, will develop a specific VGP appropriate to the identified mitigation measures and livelihood enhancement activities. ESMPs will be developed based on the ESMF’s objectives and principles and the RAP as per guidance of the RPF to ensure the active participation of all vulnerable groups. 6.3.2 Timelines 211. Stakeholders’ engagement plan is necessary to commence prior to start the project in order to identify who are key stakeholders, what role they can contribute to VG communities and maintaining meaningful interaction with them. SE is also done during Identification of beneficiaries to make sure all VGs are included. Stakeholders’ engagement is done throughout the project implementation when periodic monitoring is done to assess the progress and if implementation is done according to plan, challenges are identified on time to allow for corrections. 6.3.3 Review of Comments 212. Methodology used to gather comments during stakeholders’ engagement interactions will includes; taking notes during focus group discussion, during interview with key informants and feedbacks during village assembly meetings. Data acquired will be analyzed and used to prepare report. The review will be done to assess the level of stakeholder’s engagement to the project 213. This information will be used to prepare field reports, quarterly reports and semi-annual reports. Some of data to be gathered includes pictures, maps and minutes of village assembly meetings with attendance 6.4 Resources and Responsibilities for implementing stakeholder engagement activities 6.4.1 Human Resources 214. The resources for the implementation of stakeholder’s engagements will depend on the size, nature, type and time. Both human and material resources will be required to implement the plan at all levels from the national up to the community. At the national level, there are Ministries, followed by Regional Secretariats, while at the District level, administrative roles are executed by the District Commissioners and District Administrative Secretaries. The Local Government level is handled by LGA Directors (Directors for City, Municipal and Town Councils and Executive Directors for District Councils). Under the LGA Directors, there are several heads of department who are supporting the 49 Directors such as planners, community development officers, and water, natural resources, land specialists, etc. 215. At the community level, the governance is under Village Council/Mtaa/Shehia, whereby administrative roles are executed by Village/Mtaa/Shehia Executive Officers. The community administration is directly linked with its people, and it is at this level that community meetings are organized for the purpose of public consultation, involvement and notable participation into development activities such as sub-projects design, planning and implementation. 216. The TMU is the executing agency of this project and PAAs are implementing agencies under the guidance of TMU. The TMU will be responsible for overall implementation, monitoring and supervision. 6.4.2 Management functions and responsibilities 217. Different stakeholders from national up to the community level will play different roles and responsibilities in relation to managing and implementing Stakeholders Engagement Plans (SEP) as follows; 6.4.2.1 Village and Ward levels 218. Village and ward leaders, Extension Officers and Community Management Committees (CMC) will be responsible for ensuring all stakeholders are engaged in the project activities in their respective areas. Specific responsibilities will be; i. Awareness creation in the community about the Stakeholders Engagement Plans; ii. Facilitating meetings in the communities which involves all stakeholders; iii. Assisting the community in the process of preparing Stakeholders Engagements Plan at community level; iv. Participating in the planning, implementation, monitoring and evaluation of Stakeholders Engagements Plans at the village level; v. Preparing and submitting implementation reports to the Village Council/Shehia Advisory Council/Mtaa Committee regarding Stakeholders Engagements; vi. Address grievances at the community levels related to Stakeholders Engagements 6.4.2.2 PAA and regional levels 219. The PAA and Regional levels will be responsible for ensuring all stakeholders are engaged in the Project activities in their respective areas; specific responsibilities will be as follows: i. Awareness creation at PAA and Regional levels about the Stakeholders Engagement Plan; ii. Facilitating community to identify of key Stakeholders to be engaged into project activities; iii. Providing technical assistance to village leaders, CMCs and local communities as needed in the preparation and implementation of the Stakeholders Engagement Plans; iv. Ensuring that Stakeholders Engagements Plans re mainstreamed into PAA Annual plans; 50 v. Participating in the planning, implementation, monitoring and evaluation of Stakeholders Engagements Plans at PAA levels; vi. Prepare progress reports on the implementation of Stakeholders Engagements Plans; vii. Monitoring and evaluation planning and implementation of the Stakeholders Engagements 6.4.2.3 National Level 220. At national level, TASAF Management Unit (TMU) will ensure compliance of Environmental and Social Standards 10; Stakeholders Engagements and Information Disclosure as follows; i. Providing technical support and capacity building to PAAs, Community and other Stakeholders on the implementations of Stakeholders Engagements and Information Disclosure; ii. Monitoring and evaluation of the impacts of Stakeholders Engagements and Information Disclosure at the PAAs and Community levels; iii. Prepare progress reports on the implementation of Stakeholders Engagements and Information Disclosure; iv. Establishment and maintenance of effective M&E system including database and MIS at this level; and v. Knowledge management and learning as far as the Stakeholders Engagements and Information Disclosure is concerned; 6.5 Monitoring and Reporting 6.5.1 Involvement of stakeholders in monitoring activities 221. During Project implementation, third parties will be involved in monitoring of the project performance and measuring associated impacts. During identification of sub-projects the VGs, VCs, CBOs and NGOs representatives who are working within the area and other community members will be involved. During implementation monitoring will be done on quarterly basis where stakeholders who were involved during consultation meetings can be invited on rotational basis (timeline and tools to be used will be shared). At each site visit technical advice on issues observed will be provided in the site visit book and back to office report prepared as per TASAF guidelines. 6.5.1 Reporting back to stakeholder groups 222. Stakeholders’ engagement outcomes will be reported back to the communities and other stakeholders immediate after the exercise has been accomplished, and report and minutes prepared. The team members will write the report and attach all relevant documentation according to evidence gathered. The report /findings on focus group discussions and progress of project activities will be shared at community level (Village assembly), PAA level and as well as National level. Emphasis will be made on availability of grievances redress mechanism and the process involved communicating grievances. 51 CHAPTER 7: GRIEVANCE REDRESS MECHANISM 7.1 Introduction 223. The implementation of the Program activities, involves interaction with the community hence it is important to promote broader citizenship engagement to enhance transparency and accountability. The project continues to strengthen and upgrade the grievance redress mechanism established for the PSSN I and works through the appropriate institutional structures for Project management at national, PAA and community levels. This is well supported by the functional computerized management information system (MIS), and the monitoring and evaluation (M&E) system that has demonstrated its capacity to generate timely information on inputs, outputs and results. Therefore, both clients and non-clients of the Project can bring grievances about issues that concern them like the cash transfer program and its timeliness and completeness of the transfers, management of the PW program and transparency in provision of benefits as well as any irregularities in the entire Project GRM provides a formal channel for citizens to air their grievances and hold the program accountable so as to improve performance and provide high level of accountability. 224. The program advocates for a Grievance Redress Mechanism System in place as a formal process for receiving, evaluating and redressing program-related grievances from affected communities and the public. Grievances may be reported in form of claim, complaint or issue related to benefit-sharing, resettlement or compensation process. 225. A wide range of project-affected people: community members, members of vulnerable groups, project implementers, civil societies, and the media; are encouraged to bring grievances and comments to the attention of project authorities. Grievances can be received through these communication channels; hotline number +255 739 000 038; email address malalamiko@tasaf.org, face to face communication, media or fill an uptake form available at villages/mtaa/shehia. In additional to sensitization of how to lodge a grievance, it is also addressed during the community sessions for PSSN II participants and through posters placed at pay-point centers which provide the same message. 226. Formation of grievance committee comprising of PAA Coordinator, Environmental Officer, Land Officer and Community Development Officer is amongst the action plans vital to address all grievances related to Project performance. For effectiveness and efficiency of GRM, the procedures for handling grievance will be simple and administered as far as possible by the Village Council and Grievance Committee at the PAA level. The Village Council or Shehia committee and PAA Grievance Committee shall maintain records where grievances and complaints, including minutes of discussions, recommendations and resolutions made, will be recorded. 227. The nature of grievance reported might necessitate involvement of different levels in decision making to be resolved. The court will be the ultimate decision maker as per flow diagram below: Village Ward PAA TMU Court 52 7.2 The procedure of grievance redress 228. Procedures to file grievances and seek action should be simple enough to PAP and understandable. All grievances, simple or complex, should be addressed and resolved in a quick and constructive manner within a period of fourteen (14) days, supported by a timely feedback to aggrieved person where necessary. 229. The affected person should file his grievance in writing, to the Village Council or Shehia committee. The grievance note should be signed and dated by the aggrieved person. Where the affected person is unable to write, he should obtain assistance to write the note and emboss the letter with his/her thumb print. 230. The Village Council or Shehia committee resolves those disputes it can, depending on the nature of the complaint and where the mandate lies for the issue concerned. Unresolved issues/disputes beyond their mandate are referred to adjudication to the PAA. Village Council or Shehia committee keeps records of all complaints received, whether and how the VC resolved these and which complaints were forwarded to the PAA coordinator. The Village Council will inform in writing the complainant on the decision within 14 days. 231. PAA Coordinator submits unresolved grievances to the PAA Grievance Committee. The PAA grievance Committee reviews the complaints and determines the appropriate course of action according to the laws, rules and regulation. All complaints about abuse in service, potential corruption must be channeled to proper authorities in no more than 14 days after the complaint is received. The PAA Grievance Committee generates a letter to the complainant to inform them of the action taken. 232. In addition to submitting a complaint to the VC, people may also lodge complains with any member of the PAA Management Team (CMT). Complaints received by CMT members are logged with TASAF coordinator and considered by the PAA Grievance Committee. If the coordinator is implicated in the complaint, then the complaint is forwarded directly to the PAA Director/ Principal Secretary. 233. The PAA Grievance Committee should respond within 14 days during which any meetings and discussions to be held with the aggrieved person should be conducted. If the grievance relates to valuation of assets, PAA Grievance Committee should be requested to revalue the assets, and this may necessitate a longer period of time. In this case, the aggrieved person must be notified by PAA grievance committee through the Village Council that his/her complaint is being considered. 234. The Grievance Committee will produce a report containing a summary of all grievances and will make this available to the TMU on a quarterly basis. 235. If the aggrieved person is dissatisfied with the decision of the PAA Grievance Committee and other higher authorities or If no agreement is reached at this stage, then the complaint can be taken through the formal court process, i.e. to the Village Land Council, the Ward Tribunal where relevant, District Tribunal and the High Court (Land Division) at the National level. Samples of Grievance 53 Reporting and Grievance Resolution Forms are as included in the Stakeholder Engagement Plan. Potential Grievance/Disputes and respective procedure 236. Potential grievances and disputes likely to emerge during the course of Project implementation may relate to the following respective areas; 7.2.1 Environmental and social issues i. Poor prevention of increased sediments into streams, ponds and rivers due to erosion from road tops ii. Inadequate treatment/control of dust by water or other means during road and water ponds construction. iii. Inadequate protective clothes to minimize danger to field workers applying agro-chemical iv. Improper management during application of herbicides and pesticides to open horticulture farms. v. Water use right NOT clearly defined by recipient Community. vi. Exclusion and Inclusion error 7.2.2. Vulnerable group issues i. Disappearing of social and culture issues due to interference with other communities ii. Encroachment on and degradation of land, territory and natural resources iii. Loss of range land and hunting blocks/ areas iv. Loss of forests in culturally sensitive areas for VG v. Gender based violence as a result of changes in power relations due to cash for work. 7.2.3. Other Vulnerable Groups 237. Vulnerable persons may be affected during compensation process because of a disability or other nature of disadvantage, and/or maybe made more vulnerable as a result of the compensation process. Vulnerable persons may include orphans, persons with disabilities, elderly persons, HIV/AIDS affected/or infected, widows, widowers, people suffering from serious illnesses, women and children at risk of being dispossessed of their productive assets-land- as a result of the land compensation process that may benefit the sole male household head and malnourished children. Assistance to Vulnerable groups 238. Project intends to provide necessary assistance to vulnerable group as major strategy of safety mechanism. (i) Assistance given to vulnerable persons would adhere to the following steps: a) Identification of person and cause of their vulnerability. This may either come directly or through the communities’ representation; this step is critical because often vulnerable people do not participate in community meetings, and their disability/vulnerability may remain unknown. b) Identification of required assistance at the various stages of the process including negotiation, compensation and reallocation procedures; 54 c) Implementation of the above measures; d) Monitoring and continuation of assistance after reallocation if required (ii) The type of assistance given to vulnerable may include the following: a) Assistance in effecting compensation, b) Assistance in reallocation, providing vehicle, driver and facilitation at the reallocation stage, providing ambulance services for disable persons during reallocation process; c) Assistance in building construction example providing materials and workforce or building houses; d) Health care if required at critical periods: moving and transition period. 55 CHAPTER 8: CAPACITY BUILDING FOR ESMF 8.1 Introduction 239. Training and capacity building is instrumental in the realization of the objectives of the ESMF. Experience gained from implementation of PSSN I intervention shows that there is inadequate technical capacity at PAA, ward and community level to address environmental and social issues comprehensively. In many PAAs, there is an employed Environmental Management Officer (EMO) who handles environmental matters. Given the scope of projects being implemented at the PAA level it is important to build the capacity of the PAA technical team comprised of various sectors to address safeguards issues during implementation of the project based on the ESS 240. In this regard, the Program will build the capacity of PAA technical team to handle environmental and social issues of the Project. This will be done during training of PAA technical team on PWP implementation guidelines and procedures focusing on Watershed Management and Integrated Natural Resources Management (INRM). 241. The trained PAA technical team will build the capacity of Wards Extension Staff, and Village/Mtaa/Shehia Council and Environmental Management Committee and CMCs on Safeguards Frameworks. 8.2 Capacity building at different levels 242. The capacity building requirements and subsequent functions of various levels is as follows; National level 243. Since PW and Livelihood Enhancement sub components will be roll-out to full scale, there will be an increased demand for capacity building to TMU staff and SET members to effectively implement and monitor Safeguard measures. At National level three Environmental and Social Safeguard Experts have been hired to monitor safeguard compliance and provide technical support to PAAs during the implementing of the program. Orientation on the new Environmental and Social Framework to the TMU staff was done during the Program design as part of capacity building. During the screening of proposed subprojects, the Environmental and Social safeguard specialists will make use of the environmental and social guidelines for the selection and design of subprojects as described in the Technical Manual. Specifically, the safeguard team at TMU will be responsible for: iv. Ensuring the Program compliance with ESMF requirements, and continually advocate and raise awareness at all levels. v. Conduct training and orientation on the requirements of the ESMF to PAAs vi. Reviewing monitoring reports submitted by the PAAs vii. Provide technical backstopping to PAA technical team on the compliance of the ESF viii. Monitoring potential cumulative impacts from Program activities 56 PAA level 244. At this level training will be done on Environmental and Social Standards. The training at PAA will target technical team which will be formed from a multi-disciplinary team of experts who will support communities in subproject planning, design, implementation, monitoring and evaluation. In this regard, a four days training will be organized to build their capacity during rollout of the Program. Successive trainings will be carried out in the course of Program Implementation. Objectives of the training will be: • To build capacity of PAAs on implementation of ESF and its standards • Support communities to mainstream environmental and social issues in their sub- projects. • Ensure that PAAs have the capacity to assist communities in managing potential environmental and social impacts • Strengthen the capacity of other services providers such as Local Service Providers (LSP) to provide technical support to communities in environmental and social aspects of the sub-projects. 245. The training will focus among others on National Environmental and Social Management process, project principles and guidelines, the procedure to be followed under this ESMF, design of mitigation measures and preparation of ESMP, stakeholder’s consultations in Program implementation cycle and procedures to monitor mitigation measures, roles and responsibilities and reporting mechanism. The capacity building activities will be implemented as indicated in Annex 12. 246. Specific training plan will also be developed and implemented at all levels (from national to village/community level) to ensure minimization of possibilities of discrimination in project implementation through robust trainings on non-discrimination for all those who play a part in project implementation, especially including the local committees. Such training will explicitly address common grounds for discrimination grounded in unconscious or conscious bias, disability, albinism and any other social status. 8.3 Budget for Capacity Building in Environmental and Social Frameworks 247. Budget to implement ESMF in the Program subcomponents (PWP, LE, Communications etc.) will be mainstreamed in the respective subcomponents budget. The budget to implement ESMF under safeguards Unit will cover capacity building, issues such as trainings, backstopping, orientation, information sharing and awareness raising sessions. it is estimated that about US$ 935,000 will be required to build the capacity at National and PAA levels 57 ANNEXES Annex 1: Brief description on the nature and estimated cost for major types of subprojects i) Community Ponds and Water and environmental conservation Subproject types: Earth ponds, hand-dug wells, pans and ponds. 1. Is a structure constructed by excavation of land surface for the objective of making a depression to harvest rainwater runoff? The excavated soil is used to construct the embankment across the runoff at the downstream of the depression in order to raise the level of water in the reservoir. The storage water capacity is obtained entirely by digging, thus the harvested water is mainly used for small water supply for domestic and livestock use. The recommended height of the embankment is a maximum of 3.0m high, of which 1.0m is used as a freeboard to discharge excess water. Construction of community ponds follow the following steps; site clearance, removal of top soil, excavation of foundation, excavation of reservoir/depression, formation of embankment with soil placed and compacted in layers not exceeding 15cm, construction of spillway and stabilization of embankment e.g. planting of vegetation cover or stone pitching. All these activities are done using labor. 2. The average estimated cost for construction of community ponds depends on size of the pond. Generally, the cost of constructing a community pond with a storage capacity of 9,000 cubic metered water is about USD 16,700, where USD 12,525 is for labor and USD 4,175 is for other inputs like working tools and protective equipment, construction materials and supervision. ii) Hand Dug Well Subproject types: Hand-dug wells, shallow wells. 3. A hand dug well is a manually dug hole in the ground to abstract underground water in an aquifer with low permeability. It is an economical technique because it only requires physical labor and using simple tools like a pick and shovel, with a bucket on a rope to remove cuttings. The diameter of a hand dug well from 0.8m to 1.5 m and a depth of 5m to 10m. It can be lined using stones or pre- cast concrete rings. Water can be abstracted using bucket and rope, windlass or hand pump. 4. Construction of hand dug well generally follows the following steps; site clearance, digging through dry earth, construction of casing (wall reinforcement), construction of surface wall and top cover for preventing runoff entering into the well and construction of drainage systems and fencing. 5. The estimated cost for construction of hand dug well depends on designed width, depth, availability of construction materials and nature of the soil/rocks. Generally, the estimated cost of constructing a standard hand dug wells range is USD 1,250 to 2,500, where USD 940 is for labor and USD 310 is for other inputs or USD 10 to USD 28 per meter in depth. iii) Spring Protection, Soil and water conservation Subproject types: bench terraces, gully reshaping, filling and re-vegetation 6. Springs occur where water from an underground aquifer flows out of the ground to the surface by gravity or can be an artesian spring where the water appears at the surface under pressure from a 58 confined aquifer below. Spring water can be of good quality microbiologically if the spring is well protected. Spring protection is the improvement of the surroundings through planting of vegetation or by constructing masonry chamber to facilitate hygienic collection of protected water. The chamber is constructed using stones and cement aims at increasing the durability of the spring, quantity and quality of discharged water and protecting the spring from any contamination and soil erosion. 7. Sub-activities which done during spring protection are; site clearance, excavation of storage tank or water collection chamber, construction of water storage tank or water collection chamber, lying pipes into the water collection chamber/tank, construction of water fetching chamber and planting of vegetation. 8. Depending on availability of construction materials, size, type, nature of the spring and its surrounding environment; estimated cost for spring protection range from USD 764 to 1,488, this estimated cost includes cost for wages and inputs. iv) Soil Bunds Subproject types: Level soil bunds, level fanya juu, stone bunds, 9. Soil bunds are earth structures constructed as a technique for soil and water conservation in areas with steep and medium slopes and areas prone to soil erosion caused by water flow. The main purpose of bunds is to slow down the slope and filter runoff water from rainfall and hence reduce soil degradation. As the water flow is decelerated, higher amounts can infiltrate in the soil, leading to increased soil moisture. Furthermore, water is spread more evenly, which can prevent gully formation. Two main types of bunds have been constructed, contour bunds and semi-circular bunds. Bunds can be stabilized by planting of grasses. 10. Sub-activities associated with soil bund construction includes; site clearance, surveying, laying out, trenches excavation, bunds formation and compaction, planting of vegetation. The construction of soil bunds depends on; type of soil, size of the bunds/trenches and nature of vegetation or any obstacles like stones. 11. The height soil bund ranges from 60cm to 80cm and the space between the bunds depends slopes of the site which determined during the surveying stage. The estimated cost for soil bund is USD 0.71 per meter of the soil bund; this estimated cost includes cost for wages and inputs v) Woodlots, Agro forestry & Multi-purpose tree nursery Subprojects types: Seed collection from woodlots, homesteads areas and forests, tree/shrub seedlings and grass nurseries, Restoration of degraded land/area, Gully reshaping, filling and revegetation, Eyebrow basins, herring bones, improved pits, micro basins, micro trenches, water collection trenches 12. These are parcel of woodland or forest capable of small scale production of forest product such as wood fuel. Woodlot also produces timber and non-timber products and used for Agroforest. The forestry subprojects are implemented into categories of Establishment of tree nurseries and Tree planting. The Sequential steps in Establishment of tree nurseries are site clearance, Collection of soil ingredient (top forest soil, manure and sand), sieving and mixing soil ingredients, cutting and filling of polythene tubes, sowing tree seeds in seed beds, watering, transplant tree seedlings in polythene tubes. 59 13. In the establishment of tree nurseries, 0.25ha can be produce 100,000 seedlings whereby the average cost is about USD 10,000.00. vi) Community Access Roads Subprojects types: New access (road) construction, foot bridges and culverts, Gravel/Earth road vii) 14. A community access road is a road which enables traffic to reach a particular area in order to improve communication for various social, economic and cultural activities. These are constructed to earth road standards, with necessary drainage structures like mitre and side drains. The standard dimension for earth road is a minimum of 3.5m wide or 4.5m wide depending on the number of vehicle passing per day. 15. Sequential steps in access roads construction are setting out, site clearing (bush clearing, top soil and root removal, trees and boulder removal), earth works, cumber formation, drainage – ditch excavation, culverts/drift and erosion protection construction, Gravelling – excavation, hauling, dumping, spreading, watering and compaction. Generally, the cost of earth road is USD 6,000.00, where 75% of this is for participants labor and 25 % for other inputs like working tools, materials etc. viii) Small Scale Irrigation Subprojects type: Catch/cut-off drain, Micro ponds, river bed/permeable rock dams, small scale drip irrigation, small scale surface irrigation, and hand dug wells 16. Irrigation is the application of controlled amounts of water to plants at needed intervals. Irrigation helps to grow agricultural crops, maintain landscapes, and revegetate disturbed soils in dry areas and during periods of less than average rainfall. Surface irrigation systems using labor intensive, facilitate water movement across the surface of agricultural lands, in order to wet it and infiltrate into the soil. The general design of surface irrigation is by using open channel capable of conveying surface water for irrigation. The estimated cost of a stone masonry lined canal is USD 10,000 per kilometer. This cost includes 75% being wages for participants and inputs. 60 Annex 2: List of Projects requiring EIA based on EMA, 2004 (Mandatory projects, which require full EIA but not applicable to PSSN II) – PSSN Sub-Projects will not fall under this category and this will not be applicable.. i. Agriculture • Water management projects for agriculture (drainage, irrigation) • Large scale farming - mono- culture and mixed cropping of cash or food crops • Pest control projects such as Tsetse flies, Armyworms Quelea, Locusts, Rodents, weeds etc. • Fertilizer and nutrient management • Agricultural programmes necessitating resettlement of communities. • Introduction of new breeds of crops. • Introduction of Genetically Modified Organisms ii. Livestock and Range Management • Large Scale livestock movement • Livestock markets • Introduction of new breeds of livestock including Genetically Modified Breeds • Introduction of new or alien foreign species • Provision of public water supply (big water sources, watering points, wells etc) • Ectoparasite management (cattle dips, area treatment) • Intensive livestock rearing areas • Livestock routes • Introduction of new livestock management technologies iii. Forestry • Timber harvesting, logging and processing • Afforestation and Reforestation • Introduction of new tree species and development of forest plantations • Selective removal of commercial tree species • Pest management • Introduction of new breeds of trees (forest) including Genetically Modified Species • Construction of roads inside forest reserve • Commercial charcoal, firewood and other forest harvest operations • Establishment of commercial logging or conversion of forest land to other land uses within catchment areas iv. Fisheries • Medium to large scale fisheries • Artificial fisheries such as aqua-culture for fish, crustaceans shrimps, lobster or crabs. • Introduction of new species in water bodies • Large-scale Fish farming • Introduction of new breeds of fish including Genetically Modified species 61 • Industrial fish processing and storage v. Wildlife • Introduction of new species • Wildlife catching and trading • Hunting • Wildlife ranching and farming • Zoo and sanctuaries • Introduction of Genetically Engineered Species • Fencing • Translocation of wildlife • New protected areas especially involving resettlement of communities vi. Tourism and Recreational Development • Construction of resort facilities or hotels along the shorelines of lakes, rivers, islands, marine parks, and oceans as well as national parks, forest reserves etc. • Hill top resort or hotel development • Development of tourism or recreational facilities in protected and adjacent areas (national parks, marine parks, forestry reserves etc.) or on islands and in surrounding waters • Hunting and capturing • Camping activities walk ways and trails etc. • Sporting and race tracts/sites • Tour operations vii. Energy Industry • Production and distribution of electricity, gas, steam and hot water • Exploration, Transmission, Development and Storage of natural gas • Thermal power development such as coal • Geothermal • Hydro-power • Nuclear energy • Hydrogen energy • Introduction of new technologies in the energy sector viii. Petroleum Industry • Oil and gas fields exploration and development, including seismic survey • Construction of offshore and onshore pipelines • Construction of oil and gas separation, processing, handling and storage facilities • Construction of oil refineries • Construction of product depots for the storage of petrol, gas, diesel, tar and other products within commercial, industrial or residential areas • Transportation of petroleum products ix. Food and Beverage Industries 62 • Manufacture of vegetable and animal oils and fats • Oil refinery and ginneries • Processing, preservation and storage of meat and its products • Manufacture of dairy products • Brewing, distilling and malting • Fish meal factories • Slaughter - houses • Soft drinks • Tobacco processing • Caned or bottled fruits etc • Sugar factories • Other agro-processing industries • Genetically Modified organisms and products thereof x. Textile Industry • Cotton and Synthetic fibers • Dye for cloth • Ginneries • Introduction of Genetically Modified products such clothes xi. Leather Industry • Tanning • Tanneries • Dressing factories • Other cloth factories • Introduction of GMO products such as shoes xii. Wood, Pulp and Paper Industries • Large-scale manufacture of veneer and plywood • Large-scale manufacture of fiber board and of particle - board • Large-scale manufacture of pulp, paper, sand-board cellulose – mills xiii. Building and Civil Engineering Industries • Industrial and housing estates • Major urban projects such as multi-storey building, motor terminals, markets etc.) • Construction and expansion or upgrading of roads, harbors, highways, ship yards, fishing harbors, landing sites air fields, airports, railways, pipelines etc. • River drainage and flood control works • Hydro-electric and irrigation dams • Reservoir • Storage of scrap metal • Military installations • Developments on beach fronts 63 xiv. Chemical Industries • Manufacture, transportation, use and storage of pesticide or other hazardous and or toxic chemicals • Production of pharmaceutical products • Storage facilities for petroleum, petrochemical and other chemical products (i.e. filling stations) • Production of paints vanishes, etc. • Disposal of chemical wastes • Manufacture of fertilizer, soap and detergents xv. Extractive industry • Extraction of petroleum • Extraction and purification of natural gas • Other deep drilling - bore-holes and wells • Mining • Salt pans xvi. Non-metallic Industrial Products • Manufacture of cement, asbestos, glass, glass-fiber, glass-wool • Processing of rubber • Plastic industry • Lime manufacturing, tiles, ceramics xvii. Metal and Engineering Industries • Manufacture and assembly of motor–vehicles • Manufacture and assembly of aero planes, ships, trains • Manufacture and assembly of satellites • Manufacture of other means of transport such as trailers, motor-cycles, bicycles-cycles • Body-building • Boiler-making and manufacture of reservoirs, tanks and other sheet containers • Foundry and forging • Manufacture of non-ferrous products • Iron and steel • Electroplating xviii. Waste Treatment and Disposal (a) Toxic and Hazardous wastes • Construction of Incineration plants • Construction of recovery plant (off-site) • Construction of waste water treatment plant (off-site) • Construction of secure landfills facility • Construction of storage facility (off - site) 64 (b) Solid Wastes • Construction of incineration plant • Construction of composting plant • Construction of recovery/re-cycling plant • Construction of Solid Waste landfill facility • Construction of waste depots • Collection and transportation (c) Sewage • Construction of waste water treatment plant • Construction of marine out fall • Night soil collection transport and treatment • Construction of sewage system xix. Water Supply • Canalization of water courses • Diversion of normal flow of water • Water transfers scheme • Abstraction or utilization of ground and surface water for bulk supply • Water treatment plants xx. Health Projects • Vector control projects (malaria, bilharzia, trypanosomes etc.) • Construction and location of hospitals, dispensaries and health centers • Construction and development of Pharmaceutical industries • Construction or expansion of hospital with large bed capacity xxi. Land Reclamation and Land Development • Rehabilitation of degraded lands • Coastal land reclamation • Dredging of bars, greyones, dykes, estuaries etc. • Spoil disposal • Sea walls xxii. Resettlement or Relocation of People and Animals • Establishment of refugee camps • Dam construction • Establishment, expansion or rehabilitation of roads • Change of land use such as mining, pastoralist against farmers • Urban expansion xxiii. Transport and Infrastructure • Construction, expansion or rehabilitation of new trunk roads 65 • Construction, expansion or rehabilitation of airports and airstrips and their ancillary facilities • Construction of new, or expansion to existing railway lines • Construction of new, or expansion to existing shipyards or harbour facilities • Installation and expansion of communication towers and Electronic Industries xxiv. Electrical • Battery manufacturing • Electronic equipment manufacturing and assembly 66 Annex 3: List of small-scale activities and enterprises that require registration (these are regarded as low risk projects, which require partial assessment, some may be applicable to PSSN II and in line with the risk screening form, will only require ESMP) • Fish culture • Bee-keeping • Small animal husbandry and urban livestock keeping • Horticulture and floriculture • Wildlife catching and trading • Production of tourist handicrafts • Charcoal production • Fuel wood harvesting • Tree Nurseries • Small enterprises • Carpentry shops • Wooden furniture and implement making • Basket and other weaving • Nuts and seeds for oil processing • Bark for tanning processing • Brewing and distilleries • Taungya system • Bio-gas plants • Bird catching and trading • Hunting • Wildlife ranching • Zoo and sanctuaries • Tie and dye making • Brick making • Beach seining • Sea weed Farming • Graves and cemeteries • Urban Livestock Keeping • Urban agriculture • Fish landing stations • Wood carving and sculpture • Schools, dispensaries, community centers, Schools, Social halls and play grounds • Wood works e.g. boat building • Market places • Rain water harvesting • Garages • Carpentry • Black smith. • Tile manufacturing • Kaolin manufacturing • Vector control projects e.g. Malaria, Bilharzia, trypanosomes 67 • Livestock stock routes • Fire belts. • Tobacco curing kilns • Sugar refineries • Artisanal and small-scale mining • Rural road • Bio-mass power development such as co-generation • Wind -mills power development • Solar power development • Collection and transportation of waste Activities which do not require an EIA Certificate – Zanzibar (Some may apply to PSSN II) 1. Any domestic, private and non-commercial activity 2. Operating a small-scale shop 3. Operating a small-scale business employing few than 10 people 4. Operating tours, other than dives, and travel agencies 5. Engaging in rained agriculture over an area of less than 10 hectares 6. Operating a small-scale warehouse for storage of non-hazardous substances 7. Providing commercial clearing and forwarding services 8. Providing office and professional services 9. Operating service 10. Maintaining roads if the work does not involve upgrading or expansion of road Activities which require an EIS – Zanzibar (Not applicable to PSSN II) 1. Developing a major residential area 2. Operating a manufacturing industry with hazardous waste and by-products 3. Operating a power generation plant 4. Operating an oil refinery 5. Operating a sewage treatment and disposal system 6. Operating a water supply system 7. Operating a solid waste disposal system 8. Developing an area in a port, harbors or marina 68 9. Reclaiming land 10. Developing hotels or resorts of 100 beds or more 11. Engaging in irrigated agriculture of 20 hectares or more 12. Engaging in aquaculture 13. Developing environmentally sensitive areas, including forests, mangroves, small islets and water catchments 14. Degazetting an existing area protected under the laws of Zanzibar 69 Annex 4: Fomu ya Kutambua Aina ya Mradi na Ushirikishwaji wa Jamii 1. Sehemu ya kwanza: Utambulisho 2. Jina la Mradi: ……………………………………………………….................... 3. Sekta: ………………………………………………………………………………………. 4. Mkoa: .................................................................................. 5. Eneo la Mamlaka ya Utekelezaji: ........................................... 6. Kata: ……………………………………………………………........................... 7. Kijiji/Mtaa/Shehia: ……………………………………………..................... Sehemu ya pili: Maelezo ya Mradi (a) Taja shughuli kuu za mradi zitakazo tekelezwa; ………………………………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………………………………………… ………………………………………………………………………………………………………………………………………………………… (b) Taja aina ya vifaa vitakavyotumika wakati wa utekelezaji wa mradi i. ……………………………………………………….. vi. ..................................................................... ii. ……………………………………………………….. vii. ...................................................................... iii. ........................................................... viii. ...................................................................... iv. ........................................................... ix. ...................................................................... v. ........................................................... x. ………………………………………………………………….. (c) Taja faida gani kiuchumi na kijamii? Faida za kiuchumi: ………………………………………………………………………………………………………………………………………. …………………………………………………………………………………………………………………………………………………………………………. ………………………………………………………………………………………………………………………………………………………………………… ………………………………………………………………………………………………………………………………………………………………………… Faida za kijamii: ................................................................................................................................................................................. ................................................................................................................................................................................. ................................................................................................................................................................................. ................................................................................................................................................................................ Sehemu ya Pili: Mashauriano na wadau/Waathirika wa athari za Mazingira na Kijamii za Mradi Angalizo: Ambatisha muhtasari ukionyesha tarehe, orodha ya watu/taasisi, namba za simu, saini zao na mambo makuu yaliyojitokeza kwenye mchakato wa mashauriano. 70 Maelezo kuhusu taarifa za mashauriano i. Kuainisha Makundi ya wadau ambao watakao athirika kutokana na shughuli za mradi Wadau Athari zinazotegemewa kwa wadau Taasisi ya serikali (Soko, Shule, Hospitali, Ofisi ya kijiji) Nyinginezo zitaje: ….……………………………. …………………………………………………………….. Taasisi isiyokuwa ya kiserikali Mtu binafsi Kikundi cha watu katika jamii Kama kuna wadau wengine wataje: ……………………………………………………………………………………………………………………………………………………………… ………………………………………………………………………………………………………………………………………………………….. Je wadau waliotajwa hapo juu walitambulikaje? .......................................................................................................................................................................... .......................................................................................................................................................................... .......................................................................................................................................................................... .......................................................................................................................................................................... ii. Elezea jinsi mashauriano yalivyofanyika. Njia iliyotumika wakati wa kufanya mashauriano ni; (Weka alama ya vema panapo husika) Mkutano ya hadhara wa kijiji/Mtaa/Shehia Mkutano wa waathirika pekee Majadiliano kwenye vikundi Majadiliano na waathirika mmoja mmoja Kama kuna njia nyingine taja: ……………………………………………………………………………………………………………………………………………………………… ……………………………………………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………………………………………….... 71 iii. Masuala gani muhimu yaliyojadiliwa kwenye mashauriano hayo? .......................................................................................................................................................................... .......................................................................................................................................................................... .......................................................................................................................................................................... .......................................................................................................................................................................... ........................................................................................................................................................................ Nathibitisha kwamba maelezo yaliyotolewa hapo juu ni sahihi: Jina la Mwezeshaji aliyekusanya taarifa: …………………………………………………………………………………………………….. Cheo: ……………………………………….................................. Saini: ………………………………………………Tarehe: …………………………. Namba ya simu: …………………………………………. Jina la Afisa Mtendaji wa Kijiji/Mtaa/Shehia: ....................................................................... Saini: ...................................................................Tarehe......................................... Muhuri 72 Annex 5 Tathmini Ndogo Ya Athari Kwa Mazingira Na Kijamii (TAM) A) Maelezo ya mradi 1. Jina la Mradi: ……………………………………………………….............. 2. Sekta: ……………………………………………………………………………….. 3. Mkoa: .................................................................................. 4. Eneo la Mamlaka ya Utekelezaji: ........................................... 5. Kata: ……………………………………………………………...................... 6. Kijiji/Mtaa/Shehia: ……………………………………………................. B) Tathimini ya athari za mazingira2 Tathmini ya kimazingira Geresho Athari Geresho Jinsi ya kukabiliana nayo C) Tathimini ya athari za kijamii Geresho Athari Geresho Jinsi ya kukabiliana nayo 2 Rejea kitini Namba 1 kilichoambatanishwa 73 Annex 6 Sample Matrix of Environmental and Social Management Plan (ESMP) Sample Matrix of Environmental and Social Management Plan (ESMP)* S/n Type of subproject Potential adverse Mitigation measures Responsibility Time frame Expected cost to activity environmental and to implement undertake social impacts mitigation mitigation measures measures Community access road - dust pollution - use of protective gears PAA Facilitators, During subprojects To be determined - water pollution while working PAA Sector implementation during the subprojects - soil erosion - sprinkle water to reduce Experts, CMC, micro-planning stage dust Community - avoid unstable areas with steep slopes - monitor people and animal movement - Re-plant of vegetation Community water - water pollution - ensure proper disposal of PAA Facilitators, During subprojects To be determined ponds - vegetation clearance wastes PAA Sector implementation during the subprojects - loss of agricultural land - provide pit latrine at work Experts, CMC, micro-planning stage - Risk of increased site Community erosion - provide alternative land - Land use and for agriculture management issues - Provide drains in specific - Conflicts over water areas where there are use rights absolute need and no - water related diseases sufficient measure to reduce water runoffs and erosion 74 S/n Type of subproject Potential adverse Mitigation measures Responsibility Time frame Expected cost to activity environmental and to implement undertake social impacts mitigation mitigation measures measures - Build drains where there are natural water ways Gully control and soil - Water pollution - Provide waterways to PAA Facilitators, During subprojects To be determined erosion - Risk of accidents receive surface runoff PAA Sector implementation during the subprojects - Plant vegetation/grasses Experts, CMC, micro-planning stage on steep banks to prevent Community erosion *Note: This form will be completed during subprojects microplanning stage, for a specific subproject after it has been identified by the community. The PWP Handbook will be used to guide site selection for the subprojects and the design of mitigation measure for the identified environmental and social impacts. The site selection for identified subproject will be based on physical assessment made by Sector Expert from PAA as guided by PWP Handbook. This plan has been prepared by PAA Facilitator: Name: ……………………………………………………… Position:………………........................ Signature....................………………. Date: …………….................... Approved by PAA Environmental Officer: Name: ……………………………………………………. Signature: ………………................................................... Date: ……………………................. 75 76 Annex 7 Environmental Checklist based on Subprojects Sectors 1. Introduction: i. The PW subproject screening checklist for ESMF should be applied for PW subprojects during micro-planning as well as during subproject implementation stage. ii. The user should put a tick mark in appropriate space correspond to environmental/social impact of a subproject. iii. During micro-planning the expected mitigation measure will be chosen corresponding to predicted impact, meanwhile during implementation mitigation measures applied to corresponding observed impact. iv. The significance implies estimated level of impact to the community and is indicated as H mean High impact level, M for Medium and L for low impact level. v. The completed form should be certified and stamped by Sector Expert of respective subproject and District EMO. vi. The PAA will use the ESMF checklist according to subproject types present in the PAA. Community access roads Subprojects types: New access (road) construction, foot bridges and culverts, Gravel/Earth road Impact Environmental Predicted Observed Significance Mit. Mitigation measures applied Code /Social Impact (v) (v) H M L U Code use of protective gears while CR 1.1 CR 1 dust pollution working CR 1.2 sprinkle water to reduce dust locate properly well to avoid CR 2.1 contamination CR 2 water pollution ensure proper disposal of CR 2.2 wastes CR 2.3 provide pit latrine at work site avoid unstable areas with steep CR 3.1 slopes CR 3 soil erosion monitor people and animal CR 3.2 movement CR 3.3 Re-plant of vegetation interfere vectors life cycle by water related CR 4.1 CR 4 fish, etc diseases CR 4.2 use of bed nets and repellants Increased Improve culvert/channels CR 5 sediments into CR 5.1 design culverts 77 Impact Environmental Predicted Observed Significance Mit. Mitigation measures applied Code /Social Impact (v) (v) H M L U Code Continuous maintenance and cleaning Increased runoff Provision of adequate and CR 6 and flooding CR 6,1 well-designed drainage conditions channels Creation of Rehabilitation of borrow pits stagnant pools by filling or alternative use. CR 7 CR 7.1 of water in left borrow pits Provision of Promotion CR 8.1 Spread of materials CR 8 HIV/AIDS Work with existing HIV/AIDS CR 8.2 prevention programs Small scale irrigation3 Subprojects type: Catch/cut-off drain, Micro ponds, river bed/permeable rock dams, small scale drip irrigation, small scale surface irrigation, and hand dug wells Impac Environmental Significanc Mit. Mitigation measures t Code /Social Impact Predicte Observe e Code applied d (v) d (v) H M L U locate properly well to IR 1.1 avoid contamination ensure proper disposal of IR 1 water pollution IR 1.2 wastes provide pit latrine at work IR 1.3 site prepare tree nursery or IR 2.1 source seedlings from IR 2 vegetation clearance existing nursery IR 2.2 replant of vegetation provide alternative land IR 3.1 for agriculture Build drains in specific areas where there are loss of agricultural absolute need and no IR 3 IR 3.2 land sufficient measure to reduce water runoffs and erosion Build drains where there IR 3.3 are natural water ways 3 Whenever the subproject involves using water from international waterways or transboundary tributaries, that subproject shall not be considered for implementation under Public Works. 78 Impac Environmental Significanc Mit. Mitigation measures t Code /Social Impact Predicte Observe e Code applied d (v) d (v) H M L U Provide waterways to IR 4.1 receive surface runoff Risk of increased IR 4 Proper citing of irrigation erosion IR 4.2 sub IR 4.3 Avoid shifting cultivation establish land use guideline to avoid potential conflict between Land use and IR 5 IR 5.1 land users (irrigation management issues project versus fishing opportunities or nomadic pastoralists) Provide Water use rights IR 6.1 guidelines to the Conflicts over water community IR 6 use rights Plan water intake IR 6.2 according to available water Educate communities on poor irrigation practices IR 7.1 such as use of fertilizers and pesticides IR 7 Water pollution Monitor water quality IR 7.2 through regular testing Provide restriction IR 7.3 guideline on domestic use of irrigation water Monitor water quality IR 8.1 through testing IR 8 Salinization Ensure proper drainage IR 8.2 and soil salinity control system Clogging of drippers Provide regular flushing IR 9 IR 9.1 due to particles of the irrigation system Chewing of drippers Pests control measures IR 10 IR 10.1 by rodents should be applied. Locate and design the Disturbance to irrigation scheme to IR 11 protected areas and IR 11.1 protect natural natural habitats environment Shortage of water due Control water usage at a IR 12 to decline in water IR 12.1 low level during dry level in dry season season 79 Agro forestry Subproject type: Eyebrow basins, herring bones, improved pits, micro basins, micro trenches, water collection trenches Impact Environmental Predicted Observed Significance Mit. Mitigation measures Code /Social Impact (v) (v) Code applied H M L U vegetation AF 1.1 prepare tree nursery AF 1 clearance AF 1.2 replant of vegetation Restrict construction to Loss of degraded areas, mostly in AF 2 AF 2.1 productive land semi-arid and medium rainfall areas with shallow soils. Limit grazing around AF 3 Land degradation AF 3.1 constructed structures Risk of water Use mosquito protection AF 4 related diseases, AF 4.1 methods e.g. nets and e.g. malaria repellants Compact soil during AF 5.1 Risk of soil construction AF 5 erosion Plant grasses between herring AF 5.2 bones Avoid building trenches during AF 6.1 Risk of accidents rainy season e.g. human and Install pegs to demarcate AF 6 AF 6.2 /or animal falling working areas in the trenches Provide a well-stocked first aid AF 6.3 kit with trained personnel Multi-purpose tree nursery Subprojects types: Seed collection from woodlots, homesteads areas and forests, tree/shrub seedlings and grass nurseries, Restoration of degraded land/area, Gully reshaping, filling and revegetation, Impact Environmental Predicted Observed Significance Mit. Mitigation measures Code /Social Impact (v) (v) H M L U Code applied vegetation TN 1.1 prepare tree nursery TN 1 clearance TN 1.2 replant of vegetation Dispose all wastes such as Solid waste polythene bags, sacks used TN 2 TN 2.1 generation for storing or planting seedlings into an open pit Establish more wells where TN 3 TN 3.1 possible 80 Impact Environmental Predicted Observed Significance Mit. Mitigation measures Code /Social Impact (v) (v) H M L U Code applied Limited water Establish rain water source for TN 3.2 harvesting facility, and seedlings watering water retention mechanism Use variety of multi-purpose Unsuitable forest TN 4 TN 4.1 and fast growing indigenous production trees Introduction of Give preference to the use exotic species of indigenous species TN 5 over crowd/ choke TN 5.1 the indigenous species Fence the area to be Human TN 6 TN 6.1 restored and restrict access interference until restoration is achieved Pollution of the Avoid use and/or manage ground water, fertilizers or TN 7 TN 7.1 surface water and pesticides/herbicides habitats Limit grazing around TN 8 Land degradation TN 8.1 restoration area Establish community land Land use use management guideline TN 9 management TN 9.1 to address potential issues conflicts between land users Social conflicts Prepare community due to unclear guideline on ownership and TN 10 TN 10.1 ownership of responsibilities resources Compact soil during TN 11.1 construction TN 11 Risk of soil erosion Avoid areas with fragile TN 11.2 and/or unstable soils/slopes Soil and water conservation Subproject types: Level soil bunds, level fanya juu, stone bunds, bench terraces, stone check dam, gully reshaping, filling and re-vegetation. Impact Environmental Predicted Observed Significance Mit. Mitigation Code /Social Impact (v) (v) H M L U Code measures applied Leave some Temporary water vegetation on ground SW 1 logging in heavy SW 1.1 to help control water soils logging 81 Impact Environmental Predicted Observed Significance Mit. Mitigation Code /Social Impact (v) (v) H M L U Code measures applied Level soil bunds to SW 1.2 integrate with soil fertility management prepare tree nursery vegetation SW 2.1 or source seedlings SW 2 clearance from existing nursery SW 2.2 replant of vegetation Ensure that bunds, terraces, dams are level and well SW 3.1 compacted and constructed to avoid Risk of soil erosion soil erosion due to breakage of Provide waterways to SW 3 structures (bunds, SW 3.2 receive surface runoff terraces, stone Plant check dam) vegetation/grasses on SW 3.3 steep banks to prevent erosion Raise height of the SW 3.4 dam if necessary Sprinkle water to SW 4.1 reduce dust SW4 Dust pollution Provide protective SW 4.2 masks to workers Educate on SW5 Population influx SW 5.1 sustainable use of resources Provide temporary SW 6.1 Land pollution from toilets SW6 wastes Provide waste SW 6.2 disposal pit at the site Ensure trees are planted in places of SW 7.1 High demand of fragile areas where SW7 stones stones were fetched Provision of SW 8.1 Promotion materials SW8 Spread of HIV/AIDS Work with existing SW 8.2 HIV/AIDS prevention programs Rotate crops SW9 Loss of soil fertility SW 9.1 Use correct type and quantity of fertilizer SW10 Terrace collapse SW 10.1 Regular maintenance 82 Impact Environmental Predicted Observed Significance Mit. Mitigation Code /Social Impact (v) (v) H M L U Code measures applied Ensure enough SW 10.2 vegetation on banks Restrict access of Increased soil SW 11.1 water to a particular erosion as access point SW11 people/animals Raise community access water SW 11.2 awareness through sensitization meetings Risks of water Use of malaria control SW12 related diseases SW 12.1 techniques, e.g. nets, e.g. malaria repellants Sensitize on use of Risks of water- safe drinking water, SW13 borne diseases e.g. SW 13.1 e.g. boil water before cholera, typhoid use establish land use guideline to avoid potential conflict Land use and between land users SW14 management SW 14.1 (domestic users versus issues fishing opportunities or nomadic pastoralists) Water and environmental conservation Subproject types: Earth dams, charco dams, pans and ponds. Impact Environmental Predicted Observed Significance Mit. Mitigation measures Code /Social Impact (v) (v) H M L U Code applied Loss of land taken Community to provide up by the pond alternative land for WE 1 WE 1.1 /reservoir and its PAPs spillway(s) Introduce fish to eat vector larvae Risk of increased Fencing to restrict water related uncontrolled access WE 2 diseases e.g. WE 2.1 and unintended use of malaria, bilharzias, water typhoid etc. Use of protective equipment e.g. nets, repellants Risk of soil erosion Ensure that dams are WE 3 WE 3.1 due to breakage of level and well 83 Impact Environmental Predicted Observed Significance Mit. Mitigation measures Code /Social Impact (v) (v) H M L U Code applied structures (earth compacted and dams, charco constructed to avoid dams) soil erosion Provide waterways to WE 3.2 receive surface runoff Plant vegetation/grasses on WE 3.3 steep banks to prevent erosion Raise height of the dam WE 3.4 if necessary Provide water access at appropriate place, and WE 3.5 restrict uncontrolled access. Risk of floods to Properly design of dam WE 4 nearby WE 4.1 wall and spillways communities Proper soil WE 5.1 conservation e.g. tree planting, Increased siltation Application of WE 5 that shorten dams appropriate farming lifetime e.g. terrace bunds, WE 5.2 contour bunds along mountain slopes in catchment area Downstream users Restrict uncontrolled deprived of water use that prompt water WE 6 or subjected to WE 6.1 pollution and sediment pollution or generation sediment load Sprinkle water to WE 7.1 Dust pollution reduce dust WE 7 during construction Provide protective WE 7.2 masks to workers Educate on sustainable WE 8 Population influx WE 8.1 use of resources Provide temporary WE 9.1 Land pollution from toilets WE 9 wastes Provide waste disposal WE 9.2 pit at the site Provision of Promotion WE 10 Spread of HIV/AIDS WE 10.1 materials 84 Impact Environmental Predicted Observed Significance Mit. Mitigation measures Code /Social Impact (v) (v) H M L U Code applied Work with existing WE 10.2 HIV/AIDS prevention programs WE 11.1 Regular maintenance Earth dam, charco WE 11 Ensure enough dam collapse WE 11.2 vegetation on banks Restrict access of water Increased soil WE 12.1 to a particular access erosion as point WE 12 people/animals Raise community access water WE 12.2 awareness through sensitization meetings Risks of water Use of malaria control WE 13 related diseases WE 13.1 techniques, e.g. nets, e.g. malaria repellants Risks of water- Sensitize on use of safe WE 14 borne diseases e.g. WE 14.1 drinking water, e.g. boil cholera, typhoid water before use establish land use guideline to avoid potential conflict Water use and between land/water WE 15 management WE 15.1 users (domestic users issues versus fishing opportunities or nomadic pastoralists) 85 Annex 8 Subproject Safeguards Reporting Format SUBPROJECT SAFEGUARDS REPORTING FORMAT (END OF IMPLEMENTATION PERIOD) (To be completed by PAA facilitator) Name of PAA : ……………………………………………… Number of Village : ……………………………………………… Number of Subproject : ……………………………………………… 1. Introduction [Summary of subproject information, number of beneficiaries and gender distribution] 2. Environmental and Social Safeguards Status [Brief summary of environmental and social issues, Land acquisition and access to resources, Participation of the community and Vulnerable Groups, Climate Change issues, Safety at work place grievances redressing mechanism and the Sanitation facilities in sub project] 2.1. Environmental and social impacts and mitigation measure [A detailed description of environmental and social impacts of subprojects and respective measures to mitigate. The narrative report should be supported by an impact – mitigation measure matrix indicating subproject impact and respective mitigation measures. The matrix should contain the following headings]: S/n Subproject Expected Impact (as per Actual Impact Mitigation measure micro planning) 2.2. Land acquisition and access to resources [A detailed description of status of land ownership and acquisition method, size of land taken, coordinates of the area by Geographical Information System (GIS) and availability of such land for future use. The report should contain information on any change made to status of land ownership and use]. The land issues should be summarized in following headings: S/n Subproject Ownership status Acquisition Land size GIS Availability in method position next 2yrs 2.3. Community Participation and [A detailed description focus on key issues such as meetings convened for discussion on subproject issues, types of groups represented, key resolutions, gender representation, inclusion of Disadvantaged communities and general attendance in all period of implementation]. 2.4. Sustainability Plan [A detailed description indicating committed support during micro-planning, implementation, and operation and maintenance period. The support expected from the community, Village Council and PAA includes; provision of 86 technical support, tools storage, and supervision of assets created. The description should also indicate community involvement towards monitoring outcome of implemented mitigation measures]. 2.5. Climate Change issues [A detailed description of report on climate change effects to subproject, special focus on occurrence of floods and extreme drought in areas of subproject implementation]. 2.6. Safety at work place [a detailed description on measures taken to ensure safety at work place, indicating availability of personal protective equipment, their types and quantity. Including incidence of an accident occurrences (if any) and measures taken]. S/n Type of protective Specifications Quantity Number of gear/equipment’s obsolete protective gear 2.7. Grievances redressing mechanism [a detailed description of reported complains and methods used to address them, level at which the complains were resolved or referred to (VC, PAA, or TMU), this includes number and type of complains reported and respective solutions. Table below should be used to summarize grievances redressing mechanism] S/n Type of complains reported Number of Level at which reported Resolved at / referred complains to4 2.8. Sanitation facilities [a description focusing management of sanitation issues at the subprojects area indicating presence of sanitation facilities (toilets, washing and solid waste disposal facilities) corresponding to the number of beneficiaries]. S/n Type of sanitary facility Number of facility presence Number of beneficiaries Male Female 2.9. Lessons Learned 2.10. Implementation challenges 2.11. Way forward 4 This refers to VC, Ward, PAA or TMU 87 Annex 11 Risk Assessment and Severity Index Matrices RISK ASSESSMENT AND SEVERITY INDEX MATRICES The risk assessment is estimated by determination of severity index. The severity index is a factor of Probability of occurrence and Impact may be caused. The Probability and impact are ranked as indicated in Table below: Probability Impact A Common 1 Fatality or permanent disability B Has happened 2 Major injury C Could happen 3 Average lost time injury D Not likely 4 Minor injury E Practically impossible 5 Medical treatment only or less The Probability – Impact index is as provided on matrix below: PI Index Probability A B C D E 1 1 2 4 7 11 2 3 5 8 12 16 Impact 3 6 9 13 17 20 4 10 14 18 21 23 5 15 19 22 24 25 The severity of the risk is ranked under 3 main categories; high, medium and low. The ranking provide indication of what measures to be taken to mitigate risk in case it happens. PI Index Ranking Response required no 1 – 6 HIGH Very serious concern, of high priority, take immediate action and review regularly 7 – 15 MEDIUM Moderate concern, steady improvement needed and possibly review biannually 16 - 25 LOW Low concern, occasional monitoring, tolerate, continue with existing measures and review annually 88 Risk Assessment Risk PI Control Measures/Procedures/ No. Description of Risk Probability Impact Index Methods to Manage the Risk Description Resp 1. 2. 3. 4. 5. 89 Annex 12: Stakeholder Engagement Plan Time frame (in year) Program Phase Type of Consultation Yr Yr Yr Yr Yr Expected Monitoring stakeholder method 0 1 2 3 4 outcome indicator 1 Pre-inception PAA SE, Focus group Full participation Minutes of the period LGA, Public/ Discussions of PAAs on design meetings villagers (FGD), and meetings, implementation Information Education and Communicati on (IEC) Materials Beneficiaries, IEC Extends program Minutes of VGs Materials, knowledge to FGD, FGD, beneficiaries disseminated meetings IEC materials Disadvantaged IEC Consultation with Consultation communities Materials, VGs to get views reports, Minutes FGD, public in respective areas, of the meetings, meetings Have adequate Number of VGs involvement of VGs in the Program Ministries, Information Attain needed Minutes of the Development sharing support from other meetings Partners (DPs) session, work stakeholders, sessions on systematic guidelines engagement of review stakeholders 2 Targeting/enrolm VCs/Shehia, IEC Full participation Minutes of ent/ PAAs SE, Materials, of community on FGD, recertification FGD, Program design disseminated meetings and IEC materials implementation Beneficiaries, IEC Full participation Minutes of VGs Materials, on design and FGD, FGD, implementation disseminated meetings IEC materials PAAs FGD, Ensured adequate Minutes of meetings support from FGD, PAAs implementation reports 90 Time frame (in year) Program Phase Type of Consultation Yr Yr Yr Yr Yr Expected Monitoring stakeholder method 0 1 2 3 4 outcome indicator 3 Implementation PAAs IEC Full participation Minutes of phase Materials, on design, imple- FGD, FGD, mentation and disseminated meetings participatory IEC materials, monitoring implementation reports Participants, IEC Full participation Minutes of VGs and Materials, of community on FGD, DisComs FGD, Program design, disseminated meetings implementation IEC materials and monitoring. VCs/ Shehia IEC Provide needed Minutes of Materials, support to Program FGD, meetings, FGD, implementation disseminated meetings and participatory IEC materials monitoring NGOs, CBOs IEC Full participation Minutes of Materials, on design, FGD, FGD, implementation disseminated meetings and participatory IEC materials monitoring DPs Meetings, Provide needed Report from JRISM support to Program meetings, design, missions implementation executed and participatory monitoring 4 Decommissionin NGOs, CBOs IC Materials, Have adequate Minutes of g/ pre-design of FGD, involvement in the FGD, successive phase meetings Program disseminated IC of the Program decommissioning materials Participants, IEC Full participation Minutes of VGs and Materials, on decom- FGD, DisComs FGD, missioning disseminated meetings IEC materials PAAs IEC Full participation Minutes of Materials, on decom- FGD, FGD, missioning disseminated meetings IEC materials and implementation report 91 Annex 13: Grievance Reporting Form Grievance Reference Number (to be filled in by [name ]): Contact Details Name: Address: Tel: e-mail: How would you prefer to be By post By phone By email contacted? Details of your grievance. Please describe the problems, how it happened, when, where and how many times, as relevant What is your suggested resolution for the grievance? How to submit this form By Post to: ………………… to By hand: please drop this form at ……. By e-mail: Please email your grievance, suggested resolution and preferred contact details to: signature Date 92 Annex 14: Sample Grievance Resolution Form Name (of Complaint): __________________________________ ID Number: _________________________________ (PAPs ID number) Contact Address: __________________________________ (Village; mobile phone) Nature of Grievance or Complaint:________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ Date Individuals Contacted Summary of Discussion ________________ __________________ ___________________________ Signature____________________________________________ Date: ____________ Signed (of Complainant): _____________________________________________ Name of Person Filing Complaint: ________________________________________( if different from complainant) Position or Relationship to Filer: _________________________________________ Review/Resolution Date of Conciliation Session: _________________________________________________ Was complainant Present? Yes No Was field verification of complaint conducted? Yes No Findings of field investigation: __________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ Summary of Conciliation Session Discussion: _______________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ Issues __________________________________________________________________ Was agreement reached on the issues? Yes No 93 If agreement was reached, detail the agreement below: If agreement was not reached, specify the points of disagreement below: __________________________________________________________________________ __________________________________________________________________________ Signed (Arbitrator): ___________________________Signed (Complainant): Signed: ___________________________ Independent Observer Date: ___________________________ 94 Annex 15: Capacity building plan s/n Activity Sub Targeted group Responsible Timeline Estimated description activities budget description 1 Awareness Community VC, CMCs, Program VCs, PAA During commencement 105,000 raising Meetings Participants, Facilitators, and throughout the community members program implementation Focus Group VC, CMCs, Program VCs, PAA Throughout Program 80,000 Discussions Participants, Facilitators, implementation as the community members need arises 2 Trainings Training SET, TMU, PAA TMU During commencement 150,000 during Facilitators of Program Program implementation rollout Training SET, TMU, PAA TMU Continuously 350,000 during Facilitators throughout Program life Program time as the need arise. implementati on 3 Monitoring Backstoppin PAA Facilitators, TMU, SET, Continuously 250,000 g activities participants. PAAs, throughout Program life community time 95 Annex 16: Stakeholder Engagement During PSSN II Preparation stage 1. Preamble Introduction: Consultation was done at community level to beneficiaries and general public, which mainly aimed at; 1) to collect information on the Program that would be taken as key lesson learnt through the implementation of PSSN I, and with those 2) inform the design of PSSN II. The PSSN II Project Preparation Team (PPT) made a site visits to selected PAAs to collect stakeholder views on proposed design elements for the new Program phase. Among the components discussed during the consultation meetings, environmental and social safeguard was one of area identified for feedback as well as input into PSSN design. Objective The objective of Stakeholder consultation was to gather relevant information on implementation of the Program which will be used to inform the PSSN II design. During the Stakeholder consultation Process consultation were done to stakeholders to various Program participants, village leaders, and general public at community level. Methodology: This information was gathered through Focus Groups Discussions (FGD) and General Assembly meetings with community members, including their leaders, NGOs, CBOs, and affected persons. Discussions focused on potential positive and negative impacts of implementing PSSN I program and measures to enhancing positive impacts; and strategies/options to minimize and/or mitigate negative impacts. The meetings also focused on key issues for priority during the design of PSSN II, which include the stakeholder engagement strategies and meaningful community participation into Program activities. The Stakeholder Consultation was also made to most vulnerable groups in the Program, which include women-headed households, children, elderly, and disadvantaged communities. 2. Key Issues Discussed During Consultation Meetings On undertaking Stakeholder consultation, information on key issues was discussed as indicated below: Meetings with PAAs stakeholders: the meeting with PAA stakeholder was convened to obtain stakeholder views, sharing experience and lessons learnt in the course of Program implementation. Other discussed issues include categories of VGs exist in this area, PAA capacity and gaps in implementing ESMF RPF and VGPF, and secondary data on social cultural status, including list of NGOs/CBOs working with the communities. 96 Meetings with village key representatives: The consultation meetings were carried out with village representatives – Village Chairperson, Village Councilors (VCs), Village Executive Officers (VEO) and Community Management Committees (CMCs) of the Program, who shared Program implementation progress and challenges encountered. Subjects for discussion included among other, social cultural characteristics of the community, main source of livelihood, customary consultation methods and gender aspects in consultation. Other issues discussed include access to land and other natural resources, needed improvements for ensuring effective participation and benefits of VG on the program are safeguarded. Village assembly meetings: the village assembly gathered feedback from all community members on the implementation of the Program and highlighted areas for improvement during the PSSN II implementation period. During the meeting discussion focused on feedback from the meeting with key representatives and individual opinions on environmental and social aspects of the Program. 3. Stakeholder Consultation Key Findings A number of key findings were recorded during the stakeholder consultation for PSSN II. Among the most prominent ones include: (i) Common Consultation and Participation Methods at Community Level The community members should be consulted through recognized channels of communication depending on the type of the group in focus. For normal community members consultation is done through Village administration. Consultation of people in in specified groups can be organized by the Village Chairman, Village Executive Officer (VEO) or the VC members. The Disadvantaged Communities group, consultation is done through respective community leader; the Hadzabe having Mkuu wa Kambi as the leader of the community while the Datoga is through clan leader. When approaching these communities, the cultural community leaders are consulted and informed of intend of having a meeting with entire community. The leader is then call for a meeting by sending a person to each household informing of the meeting. When the community gathers, normally under a special tree, the meeting is convened and an interpreter translates to local language. For Hadzabe communities, most of the consultations are done in Swahili which is well known to them; meanwhile the Datoga communities an interpreter is necessary for ease understanding. (ii) Usefulness of community session on advocating social safeguard Community sessions carried out during every payment time highly promoted the application of social safeguards procedures as it served as the most suitable avenue of disseminating 97 information to beneficiaries on most appropriate use of benefits that may be accrued through received payments. In this connection, most of expected negative social impacts that would result from cash payments such as Gender-Based Violence (GBV), incoherent family situations and petty crimes among beneficiaries’ households were significantly alleviated. Community sessions also provided guidance on proper use of cash transferred so as enable beneficiary households improve their livelihood. (iii) Maintenance of cultural values and identity The VGs in subgroup of Disadvantaged Communities (DisComs) have particular traditions and culture that needs to be preserved to safeguard community values. Among objectives of PSSN implementation include fighting poverty yet safeguarding environmental and social values of the community. Implementation of the Program includes the DisComs, addressing poverty in their communities and conserves tradition and culture. It was observed that the Program did not deny or avert the rights of DisComs practicing cultural activities, hence encouraged them to continue with their activities and at the same time being beneficiaries of the PSSN. This makes the Program accepted in different cultures. (iv) Land ownership and tenure With reference to nature of the Program beneficiaries, availability, acquisition and ownership of land has been observed as a challenging issue, especially to subsistent farmers who lack own land, and hunter-gatherer communities which wander in forests looking for food and shelter. Steps has been taken to register specific areas of land which is allocated for hunter- gatherer communities, meanwhile the subsistent farmers continue to rent land for their private farming activities. (v) Sources of income for economic activities Subsistence farming and animal keeping are the main source of livelihood in the villages. The project offered an opportunity for the beneficiaries to have incomes which allows participating on the economic activities such as animal keeping, farming, joining savings and credit scheme and starting small business. (vi) Increase availability of water Water is a key resource and vital for sustaining life, the implemented PW subproject of construction of water ponds has reducing the shortage of water in the villages because the ponds are used for the different purposes such as domestic and animal use. During the discussions it was revealed that water ponds constructed were largely done in such a way that they do not pose environmental and social risks in the community because bylaws on the water use agreed by the community are followed properly, hence there are no reported cases of water borne diseases. (vii) Children wellbeing (health, education and nutrition issues) 98 Challenges on children health, nutrition issues and education are similarly experienced by all Program beneficiaries. Much has been noted as improvement due to efforts made to insist on health and education compliance conditions. Due to limited child caring capacity by elderly, children wellbeing has been a challenging issue as some children are deprived with rights of access to proper health care, education and adequate nutrition. 4. Recommended Actions It was recommended that the design of PSSN II should work to enhance the Program core values observed to promote community development meanwhile safeguarding environment and social aspects of participants and entire community. It was further recommended that there should be a strengthened technical assistance at PAA level to enable the Program subproject activities adequately comply with safeguards requirements as stipulated in ESMF, RPF and VGPF. During consultation meetings it was also suggested that safeguards tools should be simplified for ease of documentation procedures. 99 Sample Minutes from Focus Group Discussion and Special Village Assembly Meeting; Minutes of Focus Group Discussion at Qangdend Village, Karatu District 100 101 102 103 Minutes Special Village Assembly Meeting at Qangdend Village, Karatu District 104 105 106 Sample of Photos taken at various meetings during the stakeholders engagements Special Village Assembly Meeting at Kinua Village, Kiteto District, On the Right Ward Councillor Honourable …….addressing the meeting. 107 Meeting with Barbaig Communities at Mureri village, Hanang District, on the left a participant gives his opinions PAA staff met during Stakeholders engagement exercise i. Kiteto PAA Sn NAME SEX TITLE TELEPHONE Tamim Kamboma M District Executive Director Philipo Sengela M PSSN Coordinator 0784842550 1 Thomaides Aloyce M PSSN Accountant 0682554313 2 3 Stephen Mafulu M PAA Facilitator 0713673326 4 Emanuel Makundi M PAA Facilitator 0685266914 5 Dickson Maramoko M PAA Facilitator 0784516139 6 Delila Mlay F PAA Facilitator 0787380469 Ismail Said M PAA Facilitator 0676471325 7 Evelyne Mbwilo F PAA Facilitator 0756421444 8 Janeth Paulo F PAA Facilitator 0787575779 9 10 Rehema Mwinyipembe F PAA Facilitator 0756255624 11 Janeth Kawau F PAA Facilitator 9769391137 12 Kishari Shegella M TMO 0713330377 12 Tomoy Parkevu M Driver ii. Hanang PAA SN NAME SEX TITLE TELEPHONE 1 Brayson Kibassa M District Executive Director 2 Neema Onesmo F TMO 0716841906 3 Sabina Sulle F PSSNC 0784874296 4 Stephen Yonah M Facilitator 0688610060 5 Nelson Frank M Facilitator 0746107498 6 Rose Makange F Facilitator 0685541956 7 Sauli Msabaha M Facilitator 0686512313 108 8 Gaudensi Vitalisi M Facilitator 0785456182 9 Doris h.Ng’homange F DCDO 0784375163 10 vincent m. mshana M Facilitator 0784869764 11 victoria s. Gelle F Facilitator 0783470008 12 Silvan Doita M pssna 0685298217 13 Suzan Mrema F Facilitator 0755164927 14 Janeth Mollel F Facilitator 0767668239 15 Elias Mao M Facilitator 0787451492 16 Ramla k. Mang’ola F Facilitator 0784691725 17 Philemon Wayimba M Facilitator 0784745459 iii. Mbulu PAA Sn NAME SEX TITLE TELEPHONE Moses Nguvava M PSSN Coordinator 0784032595 Aniceth Kyaruzi TMO Grace Merus F 0765898193 Irene Ringo F PAA Facilitator 0769663472 Angela Gwangway F PAA Facilitator 0693323714 Delvina Moshi F PAA Facilitator 0784759767 Patricia Malley F PAA Facilitator 0621542956 Matiko Maro M PAA Facilitator 0684683647 Ezekiel Assecheck M PAA Facilitator 0784346382 Veronica Paskal F PAA Facilitator 0789643399 Godwin Kileo M PAA Facilitator 0784927449 Emanuel Maro M PAA Facilitator 0788661183 Juma Kilimba M PAA Facilitator 0784913068 Kingo Makimbuli M PAA Facilitator 0684729666 Albert Mwaulambo M PAA Facilitator 0787750077 109 Sample of list of participants during the Stakeholders engagement exercise 8.5.1 List of participants during the Focus Group Discussion with Alkie Community 110 111 112 Annex 17: Map of National Parks and major protected areas in Tanzania 113