Public Disclosure Copy

        The World Bank                                                                           Implementation Status & Results Report
        Jiangsu Water and Wastewater (P096926)


Jiangsu Water and Wastewater (P096926)

EAST ASIA AND PACIFIC | China | Water Global Practice |
IBRD/IDA | Specific Investment Loan | FY 2009 | Seq No: 9 | ARCHIVED on 08-Dec-2015 | ISR21504 |


Implementing Agencies: Jiangsu Provincial Project Management Office




Key Dates

  Key Project Dates

  Bank Approval Date:02-Jun-2009                                           Effectiveness Date:28-Sep-2009
  Planned Mid Term Review Date:28-May-2012                                 Actual Mid-Term Review Date:05-Nov-2012
  Original Closing Date:31-Dec-2014                                        Revised Closing Date:31-Dec-2015




Project Development Objectives

 Project Development Objective (from Project Appraisal Document)
 The objective of the Project is to improve the efficiency and effectiveness of water supply and wastewater management services, and reduce
 pollution discharges into the local rivers in Jiangsu Province.


 Has the Project Development Objective been changed since Board Approval of the Project Objective?
 No

 PHRPDODEL



Components

Name
Water Supply Expansion:(Cost $238.40 M)
Wastewater Management:(Cost $134.30 M)
Institutional Strengthening (IST) and Capacity Building:(Cost $1.70 M)
Financial charges during implementation:(Cost $17.90 M)



Overall Ratings
Name                                                                     Previous Rating                         Current Rating

Progress towards achievement of PDO                                       Satisfactory                           Satisfactory
Overall Implementation Progress (IP)                                      Satisfactory                           Satisfactory
Overall Risk Rating                                                       Moderate                               Low



12/8/2015                                                                                                                            Page 1 of 7
                                                          Public Disclosure Copy
                                                           Public Disclosure Copy

           The World Bank                                                                             Implementation Status & Results Report
           Jiangsu Water and Wastewater (P096926)




Implementation Status and Key Decisions

 The project is meeting its PDO targets related to (i) improvement of the efficiency and effectiveness of water supply and wastewater management
 services, and (ii) the reduction of pollution discharges into the local rivers in Jiangsu Province. In the Water Supply Component, the project successfully
 expanded water supply systems from urban core areas to townships (in Danyang, Taixing, Zhenjiang, Yancheng and Longtan), and provided more
 reliable and safer water supply service to more than 3.6 million people. The volume of bulk water supply has increased about 500,000 cubic meters per
 day, and transmission and coverage of water supply has increased from 14 to 84 towns and villages. The coverage of water supply in project cities has
 now reached 100%. In addition, the number of towns with non-revenue-water (NRW) at or below the target determined in the NRW reduction strategy
 (40%) is 58, exceeding the target of 51 towns. In the Wastewater Component, the project successfully expanded wastewater collection and treatment
 capacities in two townships in Nanjing (i.e. Qiaobei, Tiebei) with additional 150,000 tons per day and expanded wastewater collection system in three
 townships (i.e Qiaobei, Tiebei, and Chengbei), serving about 590,000 people, to reduce chemical oxygen demand (COD) loads discharged into local
 rivers by over 60,000 tons per year. More than 95% of the municipal wastewater generated in the project areas is treated today, increased from a
 baseline of 67%. The project supported capacity building and institutional strengthening of utility companies and the project management unit through
 strategic studies on NRW, tariff, GIS-based network planning, study tours and training. A total of seven study tours have been conducted thus far with
 delegations from various project implementing companies.




Risks

 Systematic Operations Risk-rating Tool

 Risk Category                                               Rating at Approval               Previous Rating              Current Rating

 Political and Governance                                     --                              Low                         Low
 Macroeconomic                                                --                              Low                         Low
 Sector Strategies and Policies                               --                              Low                         Low
 Technical Design of Project or Program                       --                              Moderate                    Low
 Institutional Capacity for Implementation and
 Sustainability
                                                              --                              Moderate                    Low
 Fiduciary                                                    --                              Low                         Low
 Environment and Social                                       --                              Low                         Low
 Stakeholders                                                 --                              Low                         Low
 Other                                                        --                              --                          --
 Overall                                                      --                              Moderate                    Low


Results

 Project Development Objective Indicators




12/8/2015                                                                                                                                  Page 2 of 7
                                                           Public Disclosure Copy
                                                              Public Disclosure Copy

               The World Bank                                                                          Implementation Status & Results Report
               Jiangsu Water and Wastewater (P096926)

 PHINDPDOTBL




          Coverage of water supply in project towns (Percentage, Custom)


                                               Baseline                      Actual (Previous)          Actual (Current)            End Target

         Value                                 78.00                         99.80                      99.80                       93.00

         Date                                  16-Apr-2008                   02-Jun-2015                30-Nov-2015                 31-Dec-2015


         Comments
         Target Exceeded. Except for Zhenjiang, all the other four cities (i.e. Yancheng, Taixing, Danyang and Nanjing) have achieved 100%.
         Zhenjiang is 99%. This indicator is related to the efficiency and effectiveness of water supply service.



 PHINDPDOTBL




          Non Revenue Water % average over supply area of city water companies (Percentage, Custom)


                                               Baseline                      Actual (Previous)          Actual (Current)            End Target

         Value                                 27.00                         28.60                      23.00                       22.00

         Date                                  16-Apr-2010                   02-Jun-2015                30-Nov-2015                 31-Dec-2015


         Comments
         Target is substantially achieved. Danyang has achieved the target (12%). In all the other three cities (Zhenjiang, Yancheng and Taixing),
         significant improvements have also been achieved, compared with the status by the end of 2014; Zhenjiang improved from 30% to 27%,
         Yancheng from 30% to 23%, and Taixing from 32% to 30%. The weighted NRW average is 23%. This indicator is related to the efficiency
         and effectiveness of water supply service.



 PHINDPDOTBL




      Total annual COD load reduction from municipal wastewater in project catchment area, except for Taixing - Huangqiao
     (Number, Custom)

                                               Baseline                      Actual (Previous)          Actual (Current)            End Target

         Value                                 18302.00                      60729.00                   60729.00                    43000.00

         Date                                  16-Apr-2008                   02-Jun-2015                30-Nov-2015                 31-Dec-2015


         Comments
         Target Exceeded. As a result of restructuring, Danyang WW and Taixing Huangqiao WW components have been replaced by treatment
         plants under Nanjing WW component. This indicator is related to reduction of pollution discharges to local rivers in Jiangsu Province.




 Overall Comments
 Most of the PDO indicators were achieved and in most cases targets were exceeded. However, based on September reported data, the NRW is
 falling slightly behind the target (23% against 22%), but it has made significant improvement from the baseline figures as well as the last update in


12/8/2015                                                                                                                                   Page 3 of 7
                                                              Public Disclosure Copy
                                                                   Public Disclosure Copy

                   The World Bank                                                                          Implementation Status & Results Report
                   Jiangsu Water and Wastewater (P096926)


 December 2014. These achievement demonstrates the achievement of the broader objectives: (i) improvement of the efficiency and effectiveness
 of water supply and wastewater management services, and (ii) the reduction of pollution discharges into the local rivers in Jiangsu Province.


 Intermediate Results Indicators
 PHINDIRITBL




              Number of project towns with 24 hour water supply (Number, Custom)

                                                    Baseline                      Actual (Previous)         Actual (Current)           End Target

               Value                                40.00                         84.00                     84.00                      52.00

               Date                                 16-Apr-2008                   02-Jun-2015               30-Nov-2015                31-Dec-2015


               Comments
               Target Exceeded. This indicator is related to project intermediate outcome of increased water supply coverage to new consumers, and
               improvements in water supply to consumers, both newly connected and in aggregated systems.


 PHINDIRITBL




              Number of project towns receiving city water supply (Number, Custom)

                                                    Baseline                      Actual (Previous)         Actual (Current)           End Target

               Value                                14.00                         84.00                     84.00                      70.00

               Date                                 16-Apr-2008                   02-Jun-2015               30-Nov-2015                31-Dec-2015


               Comments
               Target Exceeded. This indicator is related to project intermediate outcome of increased water supply coverage to new consumers, and
               improvements in water supply to consumers, both newly connected and in aggregated systems.


 PHINDIRITBL




              Number of project towns with NRW at or below the target determined in the NRW reduction strategy (Number, Custom)

                                                    Baseline                      Actual (Previous)         Actual (Current)           End Target

               Value                                18.00                         58.00                     58.00                      51.00

               Date                                 16-Apr-2008                   02-Jun-2015               30-Nov-2015                31-Dec-2015


               Comments
               Target Exceeded. This indicator is related to project intermediate outcome of increased water supply coverage to new consumers, and
               improvements in water supply to consumers, both newly connected and in aggregated systems.




12/8/2015                                                                                                                                      Page 4 of 7
                                                                   Public Disclosure Copy
                                                                     Public Disclosure Copy

                   The World Bank                                                                             Implementation Status & Results Report
                   Jiangsu Water and Wastewater (P096926)

 PHINDIRITBL




              Coverage of wastewater service in project cities (Percentage, Custom)

                                                     Baseline                       Actual (Previous)         Actual (Current)            End Target

               Value                                 67.00                          95.00                     95.00                       83.00

               Date                                  16-Apr-2008                    02-Jun-2015               30-Nov-2015                 31-Dec-2015


               Comments
               Target Exceeded. This indicator is related to project intermediate outcome of reduced municipal wastewater pollution discharged to local
               rivers.


 PHINDIRITBL




              Ratio of Municipal wastewater generated to treated wastewater in project cities (Percentage, Custom)

                                                     Baseline                       Actual (Previous)         Actual (Current)            End Target

               Value                                 50.00                          100.00                    100.00                      83.00

               Date                                  16-Apr-2008                    02-Jun-2015               30-Nov-2015                 31-Dec-2015


               Comments
               Target Exceeded. This indicator is related to project intermediate outcome of reduced municipal wastewater pollution discharged to local
               rivers.


 PHINDIRITBL




              Number of water utilities that the project is supporting (Number, Core)

                                                     Baseline                       Actual (Previous)         Actual (Current)            End Target

               Value                                 5.00                           5.00                      5.00                        5.00

               Date                                  16-Apr-2008                    02-Jun-2015               30-Nov-2015                 31-Dec-2015


               Comments
               Target Achieved. This is a core indicator added during project implementation.




 Overall Comments
 All the Intermediate Results Indicators have been achieved and in most cases targets were even exceeded. Thanks to the high efficiency of the
 implementation and the competitive procurement, most contracts showed some savings from the estimated budget. this enabled the
 implementing agencies to cover wider scope which resulted in larger reduction in CODs, wider coverage and improved performance of water
 supply services and higher increase in the water treatment capacities.




12/8/2015                                                                                                                                         Page 5 of 7
                                                                     Public Disclosure Copy
                                                       Public Disclosure Copy

           The World Bank                                                                      Implementation Status & Results Report
           Jiangsu Water and Wastewater (P096926)



 Data on Financial Performance

Disbursements (by loan)

 Project       Loan/Credit/TF   Status      Currency      Original   Revised     Cancelled    Disbursed      Undisbursed                Disbursed

 P096926       IBRD-76840       Effective   USD             130.00    130.00           0.00         119.52           10.48                        92%


Key Dates (by loan)
 Project       Loan/Credit/TF   Status      Approval Date     Signing Date     Effectiveness Date     Orig. Closing Date     Rev. Closing Date

 P096926       IBRD-76840       Effective   02-Jun-2009       22-Jul-2009      28-Sep-2009            31-Dec-2014            31-Dec-2015



Cumulative Disbursements




 Restructuring History

  Level 2 Approved on 21-Nov-2013 ,Level 2 Approved on 25-Mar-2015




 Related Project(s)


12/8/2015                                                                                                                           Page 6 of 7
                                                       Public Disclosure Copy
                                             Public Disclosure Copy

        The World Bank                                                Implementation Status & Results Report
        Jiangsu Water and Wastewater (P096926)



There are no related projects.




12/8/2015                                                                                          Page 7 of 7
                                             Public Disclosure Copy