GENERAL PROCUREMENT NOTICE UKRAINE CONFLICT RESPONSE AND RECOVERY PILOT AND CAPACITY BUILDING PROJECT GENERAL PROCUREMENT NOTICE Grant No. TF0A3307 Project ID No. P158091 The Ministry for Temporarily Occupied Territories and Internally Displaced Persons (MOT) of Ukraine has received financing in the amount of US$ 3,200,000 from the World Bank toward the cost of the Conflict Response and Recovery Pilot and Capacity Building, and it intends to apply part of the grant proceeds to payments for goods, works, related services and consulting services to be procured under this project. This project is financed by the State and Peacebuilding Fund. The project will include the following components: under Part 1 of the project (1) consulting services, such as sub-project coordination, financial, procurement, communication and PR-consultant, audit of grant activities and other short-term services; (2) goods, such as office equipment, furniture and software, mobile computer equipment, phones, vehicle, personal protection clothes, HVAC equipment; (3) works, such as office repairs; under Part 2 of the project carrying out of Subprojects in Selected Areas, including (1) improving housing infrastructure conditions; (2) increasing employment opportunities; (3) enhancing municipal services; and (4) carrying out community revitalization activities. Procurement of contracts financed by the World Bank will be conducted through the procedures as specified in the World Bank’s Guidelines: Procurement under IBRD Loans and IDA Credits (current edition), and is open to all eligible bidders as defined in the guidelines. In addition, attention of suppliers and contractors is addressed to provisions of the Conflict of Interest as described in paragraphs 1.6 and 1.7 of the Procurement Guidelines. Consulting services will be selected in accordance with the World Bank’s Guidelines: Selection and Employment of Consultants by World Bank Borrowers (current edition). In addition, attention of consultants is addressed to provisions of the Conflict of Interest as described in paragraph 1.9 of the Consultant Guidelines. Specific procurement notices for contracts to be bid under the World Bank’s international competitive bidding (ICB) procedures and for contracts for consultancy services will be announced, as they become available, in UN Development Business, dgMarket, the MOT Website and wide circulation newspapers. Procurement Plan will be published in accordance with the World Bank's procedures as governed by the latest version of guidelines. Interested Consultants may obtain further information, and should confirm their interest, by contacting: Ms. Viktoriia Voronina Phone: +380442868069 The Ministry for Temporarily Occupied Territories and Internally Displaced Persons of Ukraine 1, Lesia Ukrainka square Kyiv 01196, Ukraine Phone: +380442847713 Fax: +380442847713 Email: info@mtot.gov.ua PROCUREMENT Ukraine : Ukraine: Conflict Response and Recovery Pilot and Capacity Building PLAN General Information Country: Ukraine Bank’s Approval Date of the Original Procurement Plan: 2019-11-11 2020-11-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P158091 GPN Date: Project Name: Ukraine: Conflict Response and Recovery Pilot and Capacity Building Loan / Credit No: TF / A3307, TF / B0149 Ministry for Temporarily Occupied Territories and Internally Displaced Persons of Ukraine Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned KU-W-1-001-DC / Overhaul Component 3: Piloting of the buildings of the city activities to respond to the 2020-03- park at: 2 Dukhovnyy Lane, TF / A3307 development challenges of Post Direct Selection Direct 123,688.49 0.04 Signed 2019-12-05 2019-12-06 2019-12-06 2019-12-06 2019-12-11 2019-12-12 31 Kupyansk city, Kharkiv Region displacement and combatant (correction) return KR-W-1-001-SH / Major repairs and installation of the elevator in the academic Component 3: Piloting building No. 3 of Kryvyi Rih activities to respond to the Pending economic institute of the State Request for Single Stage - One 2020-10- TF / A3307 development challenges of Post Open - National 97,064.10 0.00 Implementat 2020-08-18 2020-08-18 higher educational institution Quotations Envelope 20 displacement and combatant ion 'Kyiv National Economic return University named after Vadym Hetman' at: 2, Vyzvolennya sq., Kryvyi Rih, 500 GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Piloting KS-G-1-009-SH / Medical activities to respond to the equipment for physiotherapy TF / A3307 development challenges of Post E-Auctions Open 5,513.05 4,760.36 Signed 2019-12-06 2019-12-18 2019-12-11 2019-12-18 2019-12-30 2020-02-03 2020-02-03 2020-08-03 2020-03-31 department (2 items) displacement and combatant return MK-G-1-007-SH / Climate Component 3: Piloting control equipment for the activities to respond to the building of the Center of TF / A3307 development challenges of Post E-Auctions Open 21,780.00 0.00 Canceled 2019-12-18 2019-12-28 2019-12-18 2019-12-28 2020-01-15 2020-02-19 2020-02-19 2020-03-31 support and leisure for IDPs displacement and combatant and ATO veterans at: 13a/8 return Kober lane Component 3: Piloting BRD-G-1-007-SH / activities to respond to the Pending Equipment for language and TF / A3307 development challenges of Post E-Auctions Open 1,365.14 0.00 Implementati 2020-03-27 2020-03-31 2020-04-21 2020-05-03 2020-05-28 speech therapist's office (1 displacement and combatant on set) return MK-G-1-007\SH / Climate Component 3: Piloting control equipment for the activities to respond to the building of the Center of TF / A3307 development challenges of Post E-Auctions Open 21,780.00 18,108.65 Signed 2020-04-06 2020-01-20 2020-04-06 2020-04-12 2020-04-06 2020-02-19 2020-04-06 2020-03-10 2020-04-30 support and leisure for IDPs displacement and combatant and ATO veterans at: 13a/8 return Kober lane Component 3: Piloting ZP-G-1-002-SH / Equipment activities to respond to the Pending for rehabilitation and TF / A3307 development challenges of Post E-Auctions Open 20,326.57 0.00 Implementati 2020-07-13 2020-07-17 2020-08-10 2020-08-22 2020-09-14 treatment displacement and combatant on return Component 3: Piloting ZP-G-1-003-SH / activities to respond to the Educational equipment for TF / A3307 development challenges of Post E-Auctions Open 24,212.00 23,920.30 Signed 2020-07-13 2020-09-14 2020-07-14 2020-08-07 2020-10-09 2020-08-19 2020-11-03 2020-09-13 STEAM-laboratory displacement and combatant return Component 3: Piloting activities to respond to the KS-G-1-010-SH / Medical TF / A3307 development challenges of Post E-Auctions Open 11,500.00 11,388.16 Signed 2020-07-13 2020-09-17 2020-07-17 2020-08-10 2020-10-15 2020-08-22 2020-11-06 2020-09-11 equipment (2 items) displacement and combatant return Component 3: Piloting activities to respond to the KS-G-1-011-SH / Medical TF / A3307 development challenges of Post E-Auctions Open 18,600.00 18,483.28 Signed 2020-07-13 2020-09-24 2020-07-18 2020-08-11 2020-10-15 2020-08-23 2020-11-06 2020-09-12 equipment (1 item) displacement and combatant return Component 3: Piloting activities to respond to the Pending SL-G-1-013-SH / Emergency TF / A3307 development challenges of Post E-Auctions Open 3,700.00 0.00 Implementati 2020-07-13 2020-07-17 2020-07-31 2020-08-05 2020-08-17 2020-09-13 Mobile Lighting Installation displacement and combatant on return Component 3: Piloting activities to respond to the Pending SL-G-1-014-SH / Dirty water TF / A3307 development challenges of Post E-Auctions Open 1,675.00 0.00 Implementati 2020-07-13 2020-07-17 2020-08-05 2020-08-17 2020-09-13 pump displacement and combatant on return Component 3: Piloting BRD-G-1-009-SH / activities to respond to the Pending Continuous-passive-motion TF / A3307 development challenges of Post E-Auctions Open 9,050.00 0.00 Implementati 2020-03-27 2020-03-31 2020-04-19 2020-05-01 2020-05-28 (CPM) device displacement and combatant on return Page 1 Component 3: Piloting activities to respond to the BRD-G-1-010-SH / Medical TF / A3307 development challenges of Post E-Auctions Open 34,500.00 33,709.75 Signed 2020-07-13 2020-09-18 2020-07-17 2020-08-10 2020-10-15 2020-08-22 2020-11-03 2020-10-31 equipment (3 items) displacement and combatant return Component 3: Piloting MK-G-1-008-SH / activities to respond to the Equipment for rehabilitation TF / A3307 development challenges of Post E-Auctions Open 21,100.00 13,941.25 Signed 2020-07-13 2020-09-15 2020-07-17 2020-08-05 2020-10-09 2020-08-17 2020-11-06 2020-09-13 and recreation displacement and combatant return Component 3: Piloting PXO-G-1-005-SH / Complex activities to respond to the Pending for physical rehabilitation, TF / A3307 development challenges of Post E-Auctions Open 10,000.00 0.00 Implementati 2020-07-13 2020-07-17 2020-08-07 2020-08-19 2020-09-13 hanging systems of displacement and combatant on kinesiotherapy return Component 3: Piloting activities to respond to the Pending PMO-G-1-007-SH / TF / A3307 development challenges of Post E-Auctions Open 3,500.00 0.00 Implementati 2020-07-13 2020-07-17 2020-08-07 2020-08-19 2020-09-13 Electrotherapy Machine displacement and combatant on return Component 3: Piloting PMO-G-1-008-SH / Medical activities to respond to the equipment (24-Hour Holter TF / A3307 development challenges of Post E-Auctions Open 3,900.00 3,017.50 Signed 2020-07-13 2020-08-27 2020-07-17 2020-08-05 2020-09-30 2020-08-17 2020-10-21 2020-09-13 Monitor EKG) displacement and combatant return Component 3: Piloting activities to respond to the Pending SL-G-1-012-SH / Truck TF / A3307 development challenges of Post E-Auctions Open 5,300.00 0.00 Implementati 2020-07-13 2020-07-17 2020-08-05 2020-08-17 2020-09-12 Snow Plow on MAZ vehicle displacement and combatant on return Component 3: Piloting activities to respond to the Pending KS-G-1-012-SH / Medical TF / A3307 development challenges of Post E-Auctions Open 50,300.00 0.00 Implementati 2020-08-24 2020-08-27 2020-09-15 2020-09-27 2020-10-30 equipment (3 items) displacement and combatant on return Component 3: Piloting BRD-G-1-012-SH / activities to respond to the Rehabilitation set for TF / A3307 development challenges of Post E-Auctions Open 63,608.70 0.00 Canceled 2020-08-24 2020-08-27 2020-09-15 2020-09-27 2020-10-30 functional therapy displacement and combatant return Component 3: Piloting BRD-G-1-011-SH / activities to respond to the Rehabilitation set for TF / A3307 development challenges of Post E-Auctions Open 63,608.70 62,076.05 Signed 2020-09-14 2020-09-17 2020-09-17 2020-10-06 2020-10-09 2020-10-18 2020-10-30 2020-11-20 functional therapy displacement and combatant return Component 3: Piloting activities to respond to the SL-G-1-012-DS / Truck TF / A3307 development challenges of Post Direct Selection Direct 4,800.00 4,606.26 Signed 2020-09-24 2020-09-15 2020-09-29 2020-09-22 2020-10-10 2020-10-19 2020-11-30 Snow Plow on MAZ vehicle displacement and combatant return Component 3: Piloting activities to respond to the Pending KS-G-1-013-SH / Diagnostic TF / A3307 development challenges of Post E-Auctions Open 42,000.00 0.00 Implementati 2020-11-05 2020-11-06 2020-11-22 2020-11-27 2020-12-14 ultrasound system displacement and combatant on return Component 3: Piloting PXO-G-1-006-SH / Medical activities to respond to the Pending equipment (Endoscopy TF / A3307 development challenges of Post E-Auctions Open 74,400.00 0.00 Implementati 2020-11-06 2020-11-09 2020-11-26 2020-11-29 2020-12-15 Devices) displacement and combatant on return Component 1 (RE): SADR Pending G-1-012-SH / Network capacity building, project Request for Single Stage - One TF / B0149 Post Open - National 99,700.00 0.00 Implementati 2020-11-09 2020-11-29 2020-12-31 equipment management, and monitoring Quotations Envelope on and evaluation Component 1 (RE): SADR Pending G-1-013-SH / Equipment for capacity building, project Request for Single Stage - One TF / B0149 Post Open - National 25,000.00 0.00 Implementati 2020-11-24 2020-12-14 2020-12-31 IP telephony management, and monitoring Quotations Envelope on and evaluation Component 1 (RE): SADR Pending G-1-014-SH / Server capacity building, project Request for Single Stage - One TF / B0149 Post Open - National 37,000.00 0.00 Implementati 2020-11-25 2020-12-15 2020-12-31 equipment management, and monitoring Quotations Envelope on and evaluation Component 1 (RE): SADR Pending G-1-015-DS / Additional capacity building, project TF / B0149 Post Direct Selection Direct 3,500.00 0.00 Implementati 2020-11-24 2020-11-29 2020-12-02 2020-12-31 ASKOD licenses management, and monitoring on and evaluation G-1-016-SH / Procurement Component 1 (RE): SADR of licensed software for the Pending capacity building, project Request for Single Stage - One needs of Ministry for TF / A3307 Post Open - National 8,000.00 0.00 Implementati 2020-11-25 2020-12-15 2020-12-31 management, and monitoring Quotations Envelope Reintegration of Temporarily on and evaluation Occupied Territories Component 3: Piloting activities to respond to the Pending SP-G-1-001-SH / Request for Single Stage - One TF / A3307 development challenges of Post Open - National 40,000.00 0.00 Implementati 2020-11-25 2020-12-08 2020-12-15 Defibrillators Quotations Envelope displacement and combatant on return NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 NCS-1-008-1-SH / Component 1 (RE): SADR Organizing and conducting capacity building, project Request for Single Stage - One TF / B0149 Post Open - National 15,000.00 13,708.40 Signed 2020-08-26 2020-09-07 2020-09-11 2020-10-07 Strategic session on management, and monitoring Quotations Envelope peacebuilding and recovery and evaluation NCS-1-011-SH / Component 1 (RE): SADR Development of the website of Under capacity building, project Request for Single Stage - One Ministry for Reintegration of TF / B0149 Post Open - National 15,000.00 0.00 Implementati 2020-10-11 2020-10-29 2020-12-31 management, and monitoring Quotations Envelope Temporarily Occupied on and evaluation Territories of Ukraine NCS-1-014-SH / Building up the local area network in the Component 1 (RE): SADR Pending administrative building of capacity building, project Request for Single Stage - One TF / B0149 Post Open - National 60,000.00 0.00 Implementati 2020-11-25 2020-12-08 2020-12-22 Ministry for Reintegration of management, and monitoring Quotations Envelope on Temporarily Occupied and evaluation Territories CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: Piloting NV-CS-1-001-CQS / activities to respond to the Consultant Consultancy services and TF / A3307 development challenges of Post Qualification Open - National 28,100.00 0.00 Canceled 2019-11-20 2019-11-19 2019-12-11 2020-01-11 2020-01-21 2020-01-24 2020-05-31 trainings. Phase 1. displacement and combatant Selection return Component 3: Piloting MK-CS-1-001-CQS / activities to respond to the Consultant Organizing and holding group TF / A3307 development challenges of Post Qualification Open - National 10,076.50 9,977.09 Signed 2020-06-07 2019-10-31 2020-06-07 2020-06-07 2020-02-11 2020-06-07 2020-06-04 2020-06-15 2020-07-21 2020-10-05 psychotherapeutic sessions displacement and combatant Selection and psychological trainings return MK-CS-1-002-CQS / Component 3: Piloting Organizing and holding activities to respond to the Consultant trainings on starting one's TF / B0149 development challenges of Post Qualification Open - National 18,400.00 18,408.52 Signed 2020-06-07 2019-10-24 2020-06-07 2020-06-07 2019-12-05 2020-06-07 2019-12-24 2020-06-07 2020-02-28 2020-08-31 own business and displacement and combatant Selection employment return INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1 (RE): SADR Individual T-1-001-CB-3 / Lessons of capacity building, project TF / B0149 Post Consultant Open 6,500.00 2,954.01 Completed 2019-12-10 2019-12-10 2020-01-07 2020-01-11 2020-01-14 2020-02-10 2020-01-18 2020-03-04 2020-05-31 2020-05-31 English language management, and monitoring Selection and evaluation Component 1 (RE): SADR Individual CS-1-023-IC / capacity building, project TF / B0149 Post Consultant Open 6,300.00 9,105.00 Signed 2019-12-16 2020-01-10 2020-01-13 2020-06-06 2020-01-23 2020-06-22 2020-01-25 2020-07-14 2020-05-31 Communications Specialist management, and monitoring Selection and evaluation Component 3: Piloting SL-CS-1-001-IC / Training activities to respond to the of personnel of Center of TF / A3307 development challenges of Post Direct Selection Direct 1,930.00 1,436.94 Signed 2019-12-27 2020-02-18 2020-01-06 2020-02-25 2020-01-22 2020-04-16 2020-03-15 public safety displacement and combatant return Component 1 (RE): SADR Individual CS-1-029-IC / Monitoring capacity building, project TF / A3307 Post Consultant Open 6,375.00 10,572.50 Signed 2020-01-15 2020-01-14 2020-02-08 2020-03-04 2020-02-13 2020-03-05 2020-02-16 2020-03-10 2020-05-31 and assessment specialist management, and monitoring Selection and evaluation Component 1 (RE): SADR CS-1-030-IC / Individual capacity building, project Communications and PR TF / A3307 Post Consultant Open 3,600.00 0.00 Canceled 2020-01-19 2020-01-17 2020-02-16 2020-02-21 2020-02-25 2020-05-31 management, and monitoring specialist Selection and evaluation Component 1 (RE): SADR CS-AUDIT-002-SSS / Project capacity building, project Audit for the years 2019 and TF / A3307 Post Direct Selection Direct 18,000.00 17,952.00 Signed 2020-02-17 2020-07-12 2020-02-27 2020-03-06 2020-03-07 2020-09-17 2020-07-17 management, and monitoring 2020 and evaluation CS-1-019-IC / Senior Coordinator of Activities in Frames of the Coordination Component 1 (RE): SADR Individual Platform on Peacebuilding and capacity building, project TF / B0149 Post Consultant Open 6,540.00 14,070.00 Signed 2020-02-03 2020-02-13 2020-02-27 2020-05-30 2020-03-01 2020-06-04 2020-03-03 2020-06-10 2020-05-31 Recovery, of the Data Portal management, and monitoring Selection on Economic and Social and evaluation Recovery, and of the Inter- Departmental Working Group CS-1-020-IC / Specialist on Component 1 (RE): SADR Individual support of the Coordination capacity building, project TF / B0149 Post Consultant Open 5,340.00 11,926.00 Signed 2020-02-03 2020-02-13 2020-02-27 2020-05-30 2020-03-01 2020-06-04 2020-03-03 2020-06-10 2020-05-31 Platform, and of the Inter- management, and monitoring Selection Departmental Working Group and evaluation CS-1-021-IC / Senior Component 1 (RE): SADR Individual Specialist of the Data Portal capacity building, project TF / B0149 Post Consultant Open 5,340.00 11,926.00 Signed 2020-02-17 2020-02-14 2020-03-14 2020-05-30 2020-03-19 2020-06-04 2020-03-23 2020-06-10 2020-05-31 on Economic and Social management, and monitoring Selection Recovery and evaluation Component 1 (RE): SADR Individual CS-1-001-IC / Sub-Projects capacity building, project TF / A3307 Prior Consultant Open 76,150.00 88,300.00 Signed 2020-05-25 2020-05-25 2020-05-25 2020-05-28 2020-05-25 2017-03-06 2020-05-31 Coordination Specialist management, and monitoring Selection and evaluation Component 1 (RE): SADR CS-1-002-IC / Financial Individual capacity building, project Management Specialist (part- TF / A3307 Prior Consultant Open 61,160.00 72,160.00 Signed 2020-05-25 2020-05-25 2017-01-20 2020-05-25 2020-05-28 2020-05-25 2017-02-06 2020-05-31 management, and monitoring time) Selection and evaluation Page 3 Component 1 (RE): SADR Individual CS-1-009-IC / Procurement capacity building, project TF / A3307 Post Consultant Open 40,250.00 22,250.00 Signed 2020-06-07 2017-10-30 2020-06-07 2017-12-21 2020-06-07 2017-12-21 2020-06-07 2018-01-02 2020-09-30 assistant (part-time) management, and monitoring Selection and evaluation Component 1 (RE): SADR Individual capacity building, project CS-1-014-IC / Translator TF / A3307 Post Consultant Open 34,270.00 34,270.00 Signed 2020-06-07 2018-06-08 2020-06-07 2018-07-02 2020-06-07 2018-07-02 2020-06-07 2018-07-02 2020-12-31 management, and monitoring Selection and evaluation Component 1 (RE): SADR CS-1-017-IC / Individual capacity building, project Communications and PR TF / A3307 Post Consultant Open 25,600.00 25,600.00 Signed 2020-06-07 2018-10-29 2020-06-07 2018-11-26 2020-06-07 2018-11-26 2020-06-07 2018-12-03 2020-12-31 management, and monitoring specialist Selection and evaluation Component 1 (RE): SADR Individual CS-1-022-IC / Procurement capacity building, project TF / A3307 Post Consultant Open 29,100.00 29,100.00 Signed 2020-06-07 2019-06-13 2020-06-07 2019-07-09 2020-06-07 2019-07-11 2020-06-07 2019-07-17 2020-12-31 specialist management, and monitoring Selection and evaluation Component 3: Piloting activities to respond to the Individual KU-CS-1-003-ІС / TF / A3307 development challenges of Post Consultant Open 3,375.00 3,356.25 Signed 2020-06-07 2019-02-22 2020-06-07 2019-11-19 2020-06-07 2020-01-20 2020-06-07 2020-02-28 2020-07-31 Consultant on accounting displacement and combatant Selection return Component 3: Piloting activities to respond to the Individual KU-CS-1-004-ІС / TF / A3307 development challenges of Post Consultant Open 2,700.00 2,700.00 Signed 2020-06-07 2019-02-22 2020-06-07 2019-11-04 2020-06-07 2020-06-07 2019-12-17 2020-07-31 Consultant on legal aspects displacement and combatant Selection return Component 3: Piloting activities to respond to the Individual KU-CS-1-008-ІС / Crisis TF / A3307 development challenges of Post Consultant Open 2,025.00 1,940.63 Signed 2020-06-07 2019-02-22 2020-06-07 2019-11-27 2020-06-07 2019-12-24 2020-06-07 2020-02-28 2020-07-31 psychologist displacement and combatant Selection return Component 3: Piloting KU-CS-1-009-ІС / activities to respond to the Individual Consultant on the HUB TF / A3307 development challenges of Post Consultant Open 1,920.00 2,000.00 Signed 2020-06-07 2019-02-22 2020-06-07 2019-11-19 2020-06-07 2019-12-17 2020-06-07 2020-02-28 2020-07-31 Creative Services: Foreman on displacement and combatant Selection Folk Crafts (Pottery) return Component 1 (RE): SADR CS-1-032-IC / Monitoring capacity building, project TF / A3307 Post Direct Selection Direct 5,000.00 4,750.00 Signed 2020-09-14 2020-09-07 2020-09-18 2020-09-15 2020-09-27 2020-10-19 2020-12-31 and evaluation specialist management, and monitoring and evaluation Page 4