Public Disclosure Copy The World Bank Implementation Status & Results Report Turkey Irrigation Modernization (P158418) Turkey Irrigation Modernization (P158418) EUROPE AND CENTRAL ASIA | Turkey | Water Global Practice | IBRD/IDA | Investment Project Financing | FY 2019 | Seq No: 5 | ARCHIVED on 02-Jun-2021 | ISR46483 | Implementing Agencies: Devlet Su İşleri (DSI), Republic of Turkey Key Dates Key Project Dates Bank Approval Date: 22-Jan-2019 Effectiveness Date: 30-May-2019 Planned Mid Term Review Date: 22-Aug-2022 Actual Mid-Term Review Date: Original Closing Date: 27-Feb-2026 Revised Closing Date: 27-Feb-2026 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The objective of the project is to improve irrigation delivery, through rehabilitation and modernization of distribution infrastructure in selected schemes, and through strengthening of capacity of WUAs. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Component 1. Irrigation System Modernization:(Cost $249.00 M) Component 2. Innovation and Institutional Support:(Cost $2.00 M) Component 3. Project Management:(Cost $3.00 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Moderately Satisfactory Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions The project is in its second year of implementation and is expected to last for additional five years until the official closing date of February 27, 2026. Despite some delays, the implementation progress to-date is Moderately Satisfactory. Construction works have commenced in Eregli-Ivriz and are expected to be launched for the three remaining schemes (Uzunlu, Atabey, and Alasehir) after the irrigation season in September 2021. The activities under Component 2 “Innovation and Institutional Support” are more advanced. The contract for the procurement of goods for the Irrigation Management Information System (“SUTEM”) hardware and the contract for Afyon Bolvadin solar-powered groundwater pilot have been signed. The remaining contract for SUTEM software is in processes. Eighty percent of the IBRD loan and 100% of the GEF grant is already committed.There was significant budget saving due to the lower actual contracted values than planned for the four contracted irrigation schemes. The overall disbursement level is about 7%, which is expected to pick-up 6/2/2021 Page 1 of 6 Public Disclosure Copy The World Bank Implementation Status & Results Report Turkey Irrigation Modernization (P158418) in the first and second quarter of FY22 (third and fourth quarter of 2021).The progress towards achievement of PDO is Satisfactory and the project is compliant with all relevant environmental and social safeguards. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Moderate Moderate Moderate Macroeconomic Moderate Moderate Moderate Sector Strategies and Policies Moderate Moderate Moderate Technical Design of Project or Program Low Low Low Institutional Capacity for Implementation and Moderate Moderate Moderate Sustainability Fiduciary Moderate Moderate Moderate Environment and Social Substantial Moderate Substantial Stakeholders Substantial Moderate Moderate Other -- Moderate Moderate Overall Substantial Moderate Moderate Results PDO Indicators by Objectives / Outcomes Improve irrigation service delivery in selected schemes in Turkey IN00986237 ►Area provided with new/improved irrigation or drainage services (Hectare(Ha), Corporate) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 50,764.00 Date 22-Jan-2019 24-Nov-2020 11-May-2021 27-Feb-2026 This indicator measures the total area of land provided with irrigation and drainage services under the Comments: project, including in (i) the area provided with new irrigation and drainage services, and (ii) the area provided with improved irrigation and drainage services, expressed in hectare (ha). IN00986239 Area provided with new irrigation or drainage services (Hectare(Ha), Corporate Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 0.00 6/2/2021 Page 2 of 6 Public Disclosure Copy The World Bank Implementation Status & Results Report Turkey Irrigation Modernization (P158418) Date 22-Jan-2019 24-Nov-2020 11-May-2021 27-Feb-2026 IN00986240 Area provided with improved irrigation or drainage services (Hectare(Ha), Corporate Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 50,764.00 Date 22-Jan-2019 24-Nov-2020 11-May-2021 27-Feb-2026 IN00986536 ►Water users provided with improved irrigation service (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 17,312.00 Date 22-Jan-2019 24-Nov-2020 11-May-2021 27-Feb-2026 This refers to the number of farmers receiving pressurized irrigation water delivery through the Comments: modernization activities financed by the project. IN00986537 Female water users provided with improved irrigation service (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 519.00 Date 22-Jan-2019 24-Nov-2020 11-May-2021 27-Feb-2026 IN00986538 ►Increase in irrigation efficiency (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 15.00 Date 22-Jan-2019 24-Nov-2020 11-May-2021 27-Feb-2026 This refers to the increase in irrigation efficiency realized by the reduction of conveyance losses. Values Comments: and targets refer to efficiency increase, in absolute percentage points from baseline, averaged over project schemes. Strengthen the institutional capacity of Water User Associations. IN00986238 ►Water User Associations (WUAs) regularly reporting on water use data (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 378.00 Date 22-Jan-2019 24-Nov-2020 11-May-2021 27-Feb-2026 This refers to the number of WUAs which are actively collecting and uploading water management data in Comments: the SUTEM MIS Intermediate Results Indicators by Components 6/2/2021 Page 3 of 6 Public Disclosure Copy The World Bank Implementation Status & Results Report Turkey Irrigation Modernization (P158418) Component 1. Irrigation Systems Modernization IN00986539 ►Length of modernized irrigation network (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1,521.00 Date 22-Jan-2019 24-Nov-2020 11-May-2021 27-Feb-2026 This refers to the length of primary, secondary and tertiary pressurized irrigation network financed by the Comments: project. IN00986541 ►Annual WUA consultations conducted and results discussed via DSI’s communication channels (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 12.00 12.00 245.00 Date 22-Jan-2019 24-Nov-2020 11-May-2021 27-Feb-2026 This refers to the formal consultations with WUAs organized by DSI before and during the construction period as well as during the implementation period. The four selected schemes correspond to 5 WUAs Comments: and DSI will conduct 7 consultations per year with each WUA. Results of the annual WUA consultations, including women consultations, will be shared with the water users via DSI’s communication channels. IN00986544 Annual WUA consultations specifically conducted with women (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 35.00 Date 22-Jan-2019 24-Nov-2020 11-May-2021 27-Feb-2026 IN00986545 Percentage of women participants in consultations reporting increased awareness of WUA's activities and project investments (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 90.00 Date 22-Jan-2019 24-Nov-2020 11-May-2021 27-Feb-2026 IN00986546 ►Percent of grievances addressed within stipulated timeframe (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 80.00 Date 22-Jan-2019 24-Nov-2020 11-May-2021 27-Feb-2026 Baseline data will be determined by DSI and then the annual progress will be entered accordingly. The Comments: indicator refers to grievances addressed within stipulated timeframes(tbc)/total number of grievances filed. Component 2: Innovation and Institutional Support IN00986540 ►WUAs trained in the use of SUTEM MIS (Number, Custom) 6/2/2021 Page 4 of 6 Public Disclosure Copy The World Bank Implementation Status & Results Report Turkey Irrigation Modernization (P158418) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 378.00 Date 22-Jan-2019 24-Nov-2020 11-May-2021 27-Feb-2026 This refers to the number of WUAs which have received the equipment and trainings needed for using the Comments: SUTEM MIS. IN00986542 ►Share of renewable energy used for Bolvadin irrigation (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 69.00 Date 22-Jan-2019 24-Nov-2020 11-May-2021 27-Feb-2026 This refers to the share of solar energy generated for irrigation in Bolvadin Groundwater Stewardship Pilot Comments: being used to cover the electricity needs for the operation of the irrigation system in Bolvadin. IN00986543 ►Reduction in Groundwater Withdrawal by Bolvadin Cooperative (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 16.00 Date 22-Jan-2019 24-Nov-2020 11-May-2021 27-Feb-2026 Comments: This indicator monitors the reduction in groundwater withdrawal by the Bolvadin Cooperative. Performance-Based Conditions Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P158418 IBRD-89190 Effective USD 252.00 252.00 0.00 16.80 235.00 6.7% P158418 TF-A9363 Closed USD 2.00 0.00 2.00 0.00 0.00 0% P167363 TF-B0863 Effective USD 2.00 2.00 0.00 0.98 1.02 49% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P158418 IBRD-89190 Effective 22-Jan-2019 15-Feb-2019 30-May-2019 27-Feb-2026 27-Feb-2026 P158418 TF-A9363 Closed 04-Feb-2019 04-Feb-2019 30-May-2019 27-Feb-2026 03-Jul-2019 6/2/2021 Page 5 of 6 Public Disclosure Copy The World Bank Implementation Status & Results Report Turkey Irrigation Modernization (P158418) P167363 TF-B0863 Effective 04-Feb-2019 04-Feb-2019 30-May-2019 27-Feb-2026 27-Feb-2026 Cumulative Disbursements Restructuring History There has been no restructuring to date. Related Project(s) P167363-GEF Turkey Irrigation Modernization 6/2/2021 Page 6 of 6