Proc. Method Prio Estimat Actual Contract Loan No Description and type r/ Bid ID ed Cost Price US$ of Post mln contract USD Reconstruction of USD “Noraduz – 20,436,903.90 ICB/Desig Lichk- Vardenis - n, Supply 8055- Vayk - Vorotan HV-W- AM 1" 220 kV and Prior 1/2011 42.5 Installatio AMD Overhead 2,135,928,253.0 n Transmission Lines Reconstruction of 110 kV “ Lalvar" ICB/Desig and 110 kV n, Supply 8055- HV-W- "Noyemberyan" and Post 6.98 USD 4,394,456.24 AM Overhead Installatio 1/2015 Transmission n Lines1 ICB/Desig n, Supply HV-W- 8388- Rehabilitation of and Prior ESRAF- 46.25 AM Substations 2 Installatio 1/2015 n Design, Supply, ICB/Desig and Installation n, Supply HV-W- 8388- ESRAF- USD for Rehabilitation and Prior 22.3 AM of 220 kV Installatio 1/2015_ 14,091,352.0 1 "Haghtanak" 3 n Design, supply ICB/Desig USD and installation n, Supply HV-W- 2,533,119.29 8388- ESRAF- EUR 2,046,265.3 of 110 kV and Prior 13.8 AM "Charencavan-3" Installatio 1/2015_ 2 AMD substation 4 n 658,639,773.45 Design, Supply, ICB/Desig and Installation HV-W- n, Supply 8388- for Rehabilitation ESRAF- USD and Prior 10.15 AM of 110 kV Installatio 1/2015_ 5,105,450.14 "Vanadzor-1" 3 n substation5 Design, Supply, ICB/Desig and Installation n, Supply HV-W- 8388- for Rehabilitation and Prior ESRAF- AM of 220 kV Installatio 1/2019 "Zovuni" n substation6 Selection Method Prior/Po Loan No Description BID ID and Type st of Contract HV-CS- 8055-AM Implementation Support Consulting QCBS(TB) Prior 1/2011 HV-CS- 8055-AM Project Audit LCS(LS) Post 2/2013 HV-CS- 8055-AM Project Audit LCS(LS) Post 2/2014 HV-CS- 8055-AM Project Audit LCS(LS) Post 1/2015 HV-CS- 8055-AM Project Audit LCS(LS) Post 1/2016 THE AUDIT of ELECTRICITY SUPPLY RELIABILITY PROJECT (IBRD 80550) FOR THE YEARS ENDED DECEMBER 31, 2016 HV-CS- 8055-AM ESR- LCS(LS) Post THE AUDIT of ELECTRICITY SUPPLY 1/2017 RELIABILITY PROJECT (IBRD 80550) FOR THE YEARS ENDED DECEMBER 31, 2017 THE AUDIT of ELECTRICITY SUPPLY RELIABILITY PROJECT (IBRD 80550) THE PERIOD FROM JANUARY 1, 2018 TO JUNE 30, 2018 (ALSO COVERING THE GRACE PERIOD) Feasibility study, project implementation support consultancy and reconstruction HV-CS- QCBS 8055-AM Prior supervision of 110 kV "Noyemberyan" and 1/2013 (LS&TB) "Lalvar" overhead transmission lines Environmental and social impact assessment study for rehabilitation of "Haghtanak", "Ashnak", "Yerevan TPP", ETNIP- "Charencavan 3", "Vanadzor 1" QCBS 8055-AM CS- Prior substations, 220 kV "Lori" and 110 kV (LS) 2/2013 "Tumanyan-1,2" "Lalvar" and "Noyemberyan" Overhead Transmission Lines Techno-economic study and preparation of bidding documents for rehabilitation of ETNIP- "Haghtanak", "Ashnak", "Yerevan TPP" , QCBS 8055-AM CS- Prior "Charencavan 3", "Vanadzor 1" (LS) 1/2013 substations, 220 kV "Lori" and 110 kV "Tumanyan-1,2" Preparation of Preliminary Environmental and Social Impact Assessment for Rehabilitation of 110 kV Lalvar and Noyemberyan Transmission Lines and HV-CS- 8055-AM Development of Environmental and Social IC(LS) Post 1/2014 Management Framework for Rehabilitation of Haghtanak, Charentsavan-3, and Vanadzor-1 Substations Compliance review of implementation of HV-CS- 8055-AM RAPs for five sections of Hrazdan TPP- CQS Post 3/2014 Shinuhayr S/S 220kV transmission line HV-CS- 8388-AM Implementation support and supervision ESRAF- QCBS Prior 1/2015 HV-IC- Individual consultant to prepare economic SSS- 8388-AM and financial analyses for rehabilitation of ESRAF- SSS Prior Zovuni substation 1/2016 HV-IC- Individual consultant to prepare EMP for SSS- 8388-AM rehabilitation of Zovuni substation ESRAF- SSS Post 2/2016 Project Audit-Project duration THE ELECTRICITY SUPPLY RELIABILITY PROJECT ADDITIONAL FINANCING (IBRD 83880) FOR THE PERIOD FROM FEBRUARY 3, 2015 TO DECEMBER 31, 2016 THE ELECTRICITY SUPPLY RELIABILITY 8388-AM PROJECT ADDITIONAL FINANCING (IBRD HV-CS- LCS Post 83880) FOR THE YEAR ENDING DECEMBER ESRAF 31, 2017 1/2017 THE ELECTRICITY SUPPLY RELIABILITY PROJECT ADDITIONAL FINANCING (IBRD 83880) FOR THE YEARS ENDING DECEMBER 31, 2018 (ALSO COVERING THE GRACE PERIOD) 8388-AM Incremental Operating Costs SOE PROCUREMENT Armenia : Electricity Supply Reliability Project PLAN General Information Country: Armenia Bank’s Approval Date of the Original Procurement Plan: 2019-11-11 2021-01-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P116748 GPN Date: Project Name: Electricity Supply Reliability Project Loan / Credit No: IBRD / 83880, IBRD / 80550 High Voltage Electric Networks JSC Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HVEN-DSI-1/2020_2 / Component 1: Strengthening Under Design, Supply and Single Stage - One 2023-11- IBRD / 83880 of the power transmission Prior Request for Bids Open - International 0.00 Implementat 2020-05-08 2020-12-01 2020-08-02 2020-12-28 2020-10-01 2021-01-29 2021-03-05 Installation for Rehabilitation Envelope 05 network ion of 220 kV "Zovuni" substation HV-W-ESRAF-1/2015_2 / Component 1: Strengthening Design, supply and Single Stage - One 7,365,826.7 2022-11- IBRD / 83880 of the power transmission Prior Request for Bids Open - International Signed 2020-10-26 2020-10-26 2020-10-26 2020-10-26 2020-10-26 2020-10-26 2016-07-01 installation for Rehabilitation Envelope 2 15 network of 110 kV "Charencavan-3" HV-W-ESRAF-1/2015_3 / Design, Supply, and Component 1: Strengthening Single Stage - One 4,083,875.7 2020-11- Installation for Rehabilitation IBRD / 83880 of the power transmission Prior Request for Bids Open - International Signed 2020-10-26 2020-10-26 2020-10-26 2020-10-26 2020-11-18 2020-11-16 2020-07-01 Envelope 1 16 of 110 kV "Vanadzor-1" network substation GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HVEN-ESR-G-1/2016 / Procurement and installation Component 1: Strengthening of the new accounting and IBRD / 80550 of the power transmission Prior Direct Selection Direct 55,440.00 Canceled management automated network system. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ETNIP-CS-1/2013 (Part A) / Preparation of bidding documents for rehabilitation of Haghtanak, Charecavan-3, Component 1: Strengthening and Vanadzor-1 substations Quality And Cost- IBRD / 80550 of the power transmission Prior Open - International 235,262.72 Signed 2014-09-04 2014-09-24 and Techno-economic study Based Selection network and preparation of bidding documents for the rehabilitation of 220 kV Lori Overhead Tranmission Line HV-CS- ESRAF 1/2015 / Project Implementation Support and Supervision Component 1: Strengthening Quality And Cost- Services for the Rehabilitation IBRD / 83880 of the power transmission Prior Open - International 1,144,179.42 Signed 2016-09-22 2016-12-08 Based Selection of HAGHTANAK, network CHARENCAVAN-3, VANADZOR- 1 SUBSTATIONS HV-CS-1/2013 (PART A) / FEASIBILITY study, PROJECT IMPLEMENTATION SUPPORT Component 1: Strengthening CONSULTANCY AND Quality And Cost- IBRD / 80550 of the power transmission Prior Open - International 494,671.38 Signed 2014-06-30 2014-07-23 Reconstruction Supervision of Based Selection network 110 kV Noyemberyan and Lalvar Overhead Transmission Lines. ETNIP-CS-2/2013 (PART A) / Environmental and Social Impact Assessment Study for Rehabilitation of Ashnak, Component 1: Strengthening Quality And Cost- Yerevan TPP substations, IBRD / 80550 of the power transmission Prior Open - International 205,707.18 Signed 2014-09-04 2014-09-27 Based Selection 220kV Lori and 110kV network Tumanyan-1,2 Lalvar and Noyemberyan Overhead Transmission Lines HV-CS-1/2013 (PARTB) / Reconstruction Supervision of Component 1: Strengthening Quality And Cost- 110 kV Noyemberyan and IBRD / 80550 of the power transmission Prior Open - International 491,098.49 Signed 2014-06-30 2014-07-23 Based Selection Lalvar Overhead Transmission network Lines Page 1 HV-CS-1/2020_ESR / THE AUDIT OF THE ELECTRICITY SUPPLY RELIABILITY PROJECT (IBRD 80550) FOR THE YEAR ENDED DECEMBER 31, 2019 Component 2: Technical Least Cost IBRD / 80550 Post Open - International 4,388.72 Signed 2020-02-28 2020-03-02 2020-03-13 2020-03-03 2020-03-25 2020-04-01 2020-04-08 2020-04-15 2020-04-15 2020-05-06 2020-04-20 2020-05-11 2020-04-30 2020-05-11 2020-06-22 and THE ELECTRICITY SUPPLY assistance Selection RELIABILITY PROJECT ADDITIONAL FINANCING (IBRD 83880) FOR THE YEAR ENDED DECEMBER 31, 2019 HV-CS-1/2021_ESRAF / THE AUDIT OF THE ELECTRICITY SUPPLY RELIABILITY PROJECT Component 2: Technical Fixed Budget Pending IBRD / 83880 Post Open - International 0.00 2021-01-22 2021-02-05 2021-02-17 2021-03-03 2021-03-12 2021-03-18 2021-03-22 2021-05-20 ADDITIONAL FINANCING (IBRD assistance Selection Implementation 83880) FOR THE YEAR ENDED DECEMBER 31, 2020 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ETNIP-HVEN-SSS-1 / Component 1: Strengthening Economic Evaluation of IBRD / 83880 of the power transmission Prior Direct Selection Direct 10,680.32 Signed 2017-04-21 Rehabilitation of Zovuni network Substation Page 2