Page 1 Bosnia and Herzegovina - ECSEE APL 3 Procurement Plan August 2, 2010 1 2 4 5 6 7 Total (#a) BF NBF 1 Environmental Upgrades at TPP Kakanj 1.1 Reconst. Electrostatic Precipitator for Unit 5 Planned: A1 5.38 4.52 0.86 ICB 1 Prior 04/08/2009 05/07/2009 05/21/2009 05/28/2009 06/20/2010 Actual: 5.38 4.52 0.86 02/20/2009 04/08/2009 04/29/2009 05/05/2009 05/27/2009 VED, Croatia 1.2 Recultivate Ash and Slag Waste Dump Planned: S&I A1 1.86 1.59 0.27 ICB 1 Prior 05/18/2010 07/01/2010 08/01/2010 09/01/2010 10/01/2011 Actual: CW* 06/09/2010 07/15/2010 1.3 Repl. of Equipment for Envir. Monitoring - Rebid Planned: A1 ICB 1 Prior 09/22/2009 05/04/2010 05/18/2010 06/24/2010 09/22/2010 Actual: 12/05/2009 01/29/2010 01/29/2010 cancelled Repl. of Equip. for Envir. Monitor. - Re-Bid Planned: S&I A1 0.73 0.61 0.12 ICB 1 Prior 03/16/2010 04/27/2010 05/27/2010 06/27/2010 05/27/2011 Actual: 0.78 0.67 0.11 03/16/2010 04/27/2010 05/31/2010 06/08/2010 07/08/2010 01/08/2011 2 Env. Upgrades at TPP Tuzla 2.1 Build New Coal Dep. System, Complete Waste Water Treatment System Planned: S&I A1 12.89 7.69 5.26 ICB 1 Prior 04/15/2010 06/15/2010 07/15/2010 08/15/2010 04/15/2012 JV of Actual: 10.32 8.83 1.49 04/25/2010 06/22/2010 07/14/2010 07/20/2010 ED-KSK 3 FMIS 3.1 Proc. Of Hardware and Software for FMIS Planned: A2 1.3 1.04 0.26 ICB 1 Prior 03/31/2009 05/27/2009 07/30/2009 08/20/2009 02/21/2011 Actual: 1.3 1.04 0.26 04/17/2009 11/28/2008 06/10/2009 06/21/2009 07/21/2009 B4B, Croatia 3.2 Technical Assistance for FMIS Planned: C A2 0.09 0.09 0 Prior 05/14/2008 06/17/2008 07/04/2008 07/17/2008 03/21/2011 Actual: 0.09 0.09 0 05/14/2008 06/10/2008 07/04/2008 07/17/2008 E.Hodzic EBPiH   S&I Review Method (Prior-/Post) Package No. S&I Proposal/ Bid Document Submission Date Description Type Category for Disbursement Estimated Cost(US$) mill 3 8 (Estimated Time Schedule) Submission of Bid Evaluation Report Procurement Method S&I SPN/ Invitation Issue Date Number of Packages Expected Completion Date E xpected Contract Signing Date BER NOL date Consultant's/ Contractor's Name JV Dvokut- Horiba, Bosnia Page 2 Bosnia and Herzegovina - ECSEE APL 3 Procurement Plan August 2, 2010 1 2 4 5 6 7 Total (#a) BF NBF Review Method (Prior-/Post) Package No. Proposal/ Bid Document Submission Date Description Type Category for Disbursement Estimated Cost(US$) mill 3 8 (Estimated Time Schedule) Submission of Bid Evaluation Report Procurement Method SPN/ Invitation Issue Date Number of Packages Expected Completion Date E xpected Contract Signing Date BER NOL date Consultant's/ Contractor's Name 4 Technical Assistance 4.1 Implementation Activities Related to the IDA-financed Project and Reduce Emission of Sulfur Dioxide and Nitrogen Oxide Planned: C A3 0.43 0.43 0 QCBS 1 Prior 04/10/2009 05/21/2009 06/05/2009 06/25/2009 12/30/2011 Actual: 0.40 0.40 04/10/2009 05/21/2009 07/10/2009 07/14/2009 08/17/2009 12/30/2011 Kema, Denmark 4.2 Study for Reconstruction of Water Treatment Plant in TPP Kakanj Planned: C A2 0.22 0.22 0 QCBS 1 Prior 11/03/2009 12/16/2009 02/12/2010 02/26/2010 08/26/2010 Inst. Of Actual: 0.81 0.81 0 11/03/2009 04/01/2010 05/11/2010 05/21/2010 Hydro. Gradenvisnko 4.3 Dam Safety Component Implementation of Dam Safety Components Planned: 2 0.49 0.49 0 QCBS 1 Prior 12/23/2008 04/21/2009 02/10/2011 A4 Actual: 0.49 0.49 0 10/28/2008 12/23/2008 04/15/2009 07/18/2009 07/22/2009 02/22/2012 Stucky, Switzerland Provide Procurement Training Non-Proc 0 0 0 EPHZHB Implementation of FMIS B2.1 Planned: S&I B1 0.55 0.55 0 ICB 1 Prior 02/20/2007 08/02/2007 Actual: 0.55 0.55 0 12/20/2006 02/20/2007 06/06/2007 06/22/2007 08/02/2007 04/29/2009 Siemens, Germany Technical Assistance 1.00 B2.2 Implementation of Dam Safety components Planned C B2 QCBS 1 Prior 10/03/2009 5/00/2009 12/00/2011 Actual: 0.33 0.33 0 08/20/2007 10/23/2008 02/27/2009 04/14/2009 07/22/2009 02/10/2011 Stucky, Switzerland C Page 3 Bosnia and Herzegovina - ECSEE APL 3 Procurement Plan August 2, 2010 1 2 4 5 6 7 Total (#a) BF NBF Review Method (Prior-/Post) Package No. Proposal/ Bid Document Submission Date Description Type Category for Disbursement Estimated Cost(US$) mill 3 8 (Estimated Time Schedule) Submission of Bid Evaluation Report Procurement Method SPN/ Invitation Issue Date Number of Packages Expected Completion Date E xpected Contract Signing Date BER NOL date Consultant's/ Contractor's Name EPRS 1 TPP Ugljevik 17.83 1.1 Monitoring and Control System Planned: 1 Prior 09/16/2009 11/03/2009 12/08/2009 01/15/2010 10/30/2010 Actual: 10/05/2009 11/18/2009 03/03/2010 cancelled Monitoring and Control System - RE-BID Planned: S&I C2 0 0 0 ICB 1 Prior Actual: 1.2 Rehab of Water Treatment System and Monitoring System Planned: C1 3.45 3.01 0.44 ICB 1 Prior 12/20/2009 01/20/2010 04/09/2010 04/28/2010 09/30/2011 Actual: 03/18/2010 05/18/2010 1.3 Reconst. Of Water Cooling System Planned: C2 6.50 5.56 0.94 ICB 1 Prior 10/14/2009 10/29/2009 01/15/2010 02/01/2010 10/30/2010 Actual: 2.60 2.07 0.38 10/29/2009 12/17/2009 02/05/2010 03/23/2010 04/06/2010 10/02/2010 1.4 Reconst. Of the Plant for own consumption-Ugljevik Planned: C2 8.4 7.19 1.21 ICB 1 Prior 09/01/2009 10/21/2009 11/21/2009 01/15/2010 10/30/2010 Actual: 6.13 4.66 0.89 09/17/2009 04/11/2009 12/09/2009 01/12/2010 02/02/2010 2 TPP Gacko 2.1 Reconstruction of Waste Water System-Gacko Planned: C1 4.68 2.97 0,70 ICB 1 Prior 12/20/2009 01/20/2010 03/10/2010 04/09/2010 09/30/2010 Actual: 06/18/2010 2.2 Reconstruction of f Ash and Slag Transportation System Planned: C1 3.84 2.64 0.58 ICB 1 Prior 11/09/2009 11/25/2009 02/22/2010 03/15/2010 06/30/2011 Actual: 3.23 2.76 0.47 01/11/2010 03/25/2010 06/26/2010 06/29/2010 02-Jan Reconstruction of 0.4 kV Plant Planned: C2 6.19 5.3 0.89 ICB 1 Prior 01/09/2009 10/20/2009 11/04/2009 12/24/2009 06/30/2010 Actual: 3.55 2.7 0.51 09/17/2009 04/11/2009 12/09/2009 01/12/2010 02/02/2010 S&I S&I S&I S&I from own sources S&I S&I ABB/Kaldera, Croatia ABB/Kaldera, Croatia BD NOL dt 6/14 URALS Power Engr. Chladizi Veze Praha, Czech S&I Page 4 Bosnia and Herzegovina - ECSEE APL 3 Procurement Plan August 2, 2010 1 2 4 5 6 7 Total (#a) BF NBF Review Method (Prior-/Post) Package No. Proposal/ Bid Document Submission Date Description Type Category for Disbursement Estimated Cost(US$) mill 3 8 (Estimated Time Schedule) Submission of Bid Evaluation Report Procurement Method SPN/ Invitation Issue Date Number of Packages Expected Completion Date E xpected Contract Signing Date BER NOL date Consultant's/ Contractor's Name 3 FMIS 3.1 Implementation of Contract from Power III Planned: S&I C3 1.40 1.4 0 Actual: 1.24 1.24 0 ICB 1 Prior 09/20/2007 12/21/2007 05/07/2008 06/02/2008 06/16/2008 02/10/2010 Siemens, Germany 3.2 Cons. Serv. For FMIS Planned: C C3 0.13 0.13 0 0.13 0.13 0 IC 1 Prior 03/06/2008 03/10/2008 Z.Radojicic 4 Technical Assistance 4.1 TA to Assist PIU to Implement the Project Planned: C4 0.54 0.54 0 QCBS 1 Prior 01/14/2009 04/10/2009 11/00/2011 Actual: 0.55 0.55 0 06/30/2008 12/02/2008 12/22/2008 02/19/2009 04/22/2009 06/22/2010 Vattenfall, German Dam Safety Component C5.2 Planned: C4 0.67 0.67 0 QCBS 1 Prior 01/14/2009 04/10/2009 11/00/2011 Actual: 0.67 0.67 0 08/20/2007 10/23/2008 02/23/2009 02/23/2009 08/23/2010 06/22/2010 Stucky, Switzerland C C Page 5 Bosnia and Herzegovina - ECSEE APL 3 Procurement Plan August 2, 2010 1 2 4 5 6 7 Total (#a) BF NBF Review Method (Prior-/Post) Package No. Proposal/ Bid Document Submission Date Description Type Category for Disbursement Estimated Cost(US$) mill 3 8 (Estimated Time Schedule) Submission of Bid Evaluation Report Procurement Method SPN/ Invitation Issue Date Number of Packages Expected Completion Date E xpected Contract Signing Date BER NOL date Consultant's/ Contractor's Name ICB - International Competitive Bidding All QCBS - Quality and Cost Based Selection All PRIOR REVIEW THRESHOLDS Page 6 sheet2 Page 7 sheet