The World Bank                                                                                   Implementation Status & Results Report
            Moldova Education Reform Project (P127388)



Moldova Education Reform Project (P127388)


 EUROPE AND CENTRAL ASIA | Moldova | Education Global Practice |
 IBRD/IDA | Investment Project Financing | FY 2013 | Seq No: 18 | ARCHIVED on 10-Sep-2021 | ISR47892 |


 Implementing Agencies: Ministry of Education, Culture and Research, Republic of Moldova, Moldova Social Investment Fund (MSIF)



 Key Dates


  Key Project Dates

   Bank Approval Date: 24-Jan-2013                                            Effectiveness Date: 01-Jul-2013
   Planned Mid Term Review Date: 14-Mar-2016                                  Actual Mid-Term Review Date: 14-Mar-2016
   Original Closing Date: 31-Aug-2018                                         Revised Closing Date: 31-Dec-2022
 pdoTable

 Project Development Objectives

  Project Development Objective (from Project Appraisal Document)
  The Project Development Objective (PDO) is to strengthen the quality of education while supporting the efficiency reforms being implemented in the
  education sector.

  Has the Project Development Objective been changed since Board Approval of the Project Objective?
  Yes

  Board Approved Revised Project Development Objective (If project is formally restructured)
  The Project Development Objective is to improve learning conditions in targeted schools and strengthen the Recipient's education monitoring
  systems, while promoting efficiency reforms in the education sector.


 Components Table

 Name
 Component 1: Strengthening the Quality of Education:(Cost $39.78 M)
 Component 2: Improving the Efficiency of the Education Sector:(Cost $8.16 M)
 Component 3: Improving the MoE's Capacity to Monitor the Reform:(Cost $2.06 M)

 Overall Ratings

 Name                                                                       Previous Rating                          Current Rating

 Progress towards achievement of PDO                                        Moderately Satisfactory                 Satisfactory
 Overall Implementation Progress (IP)                                       Moderately Satisfactory                 Moderately Satisfactory
 Overall Risk Rating                                                        Moderate                                Moderate


 Implementation Status and Key Decisions

  The Project is on track to achieving its project development objectives (PDOs) and meeting the planned targets. The Project implementation has
  been advancing well, albeit at a slower pace due to the COVID-19 pandemic and the challenges it imposed. To support the Government of
  Moldova’s efforts to ensure access to learning, the Project supported the provision of 10,000 laptops for teachers and students to ensure continued
  access to education during lockdowns. The COVID-19 pandemic has affected the rehabilitation of schools and training activities funded by the
  Project because of issues with the construction supply chain and measures to avoid the spread of the virus that have been adopted by the


9/10/2021                                                                                                                   Page 1 of 11
            The World Bank                                                                                    Implementation Status & Results Report
            Moldova Education Reform Project (P127388)



  Government. The Ministry of Education and Research has proactively sought to address these challenges. To allow sufficient time for the
  completion of project activities and account for COVID-19 imposed delays, the project closing date was extended by eight months, from April 30,
  2022 to December 31, 2022. The Project restructuring was approved on August 11, 2021 and the notice was sent to the Government on August 14,
  2021. Moving forward, the Ministry of Education and Research and Moldova Social Investment Fund are closely monitoring and adapting the
  implementation of activities that have been impacted by the pandemic to ensure their implementation and timely completion.




  Risks


 Systematic Operations Risk-rating Tool


  Risk Category                                                Rating at Approval          Previous Rating                Current Rating

  Political and Governance                                     --                          High                          Moderate
  Macroeconomic                                                --                          Substantial                   Moderate
  Sector Strategies and Policies                               --                          Moderate                      Low
  Technical Design of Project or Program                       --                          Moderate                      Moderate
  Institutional Capacity for Implementation and
                                                               --                          Substantial                   Moderate
  Sustainability
  Fiduciary                                                    --                          Moderate                      Moderate
  Environment and Social                                       --                          Moderate                      Moderate
  Stakeholders                                                 --                          Moderate                      Moderate
  Other                                                        --                          --                             Moderate
  Overall                                                      --                          Moderate                      Moderate



  Results


 PDO Indicators by Objectives / Outcomes



   Improve learning conditions in targeted receiving schools

    IN01030507
    ►Total receiving schools that meet infrastructure requirements under national quality assurance standards (Number, Custom)

                                      Baseline                      Actual (Previous)           Actual (Current)          End Target

    Value                             0.00                          12.00                       12.00                     17.00

    Date                              04-Dec-2012                   31-Dec-2020                 30-Aug-2021              31-Dec-2022
                                       The rehabilitation works have been completed in 12 schools, which include: 1. Vasile Coroban” Lyceum in
                                       Glodeni Town; 2. ”Ion Luca Caragiale” Lyceum in Orhei Town; 3.”Alexandru Puskin” Lyceum in Ungheni
   Comments:                           Town; 4.”Stefan Voda” Lyceum in Stefan Voda Town. 5. ”Mihai Eminescu” Lyceum in Cimislia Town; 6.
                                       ”Mihai Eminescu” Gymnasium in Telenesti Town; 7. ”Mihai Eminescu” Lyceum in Straseni Town; 8.
                                       „Axentii Doljnenco” Lyceum in Vulcanesti Town; 9.”Andrei Vartic” Lyceum in Ialoveni Town; 10. ”Stefan



9/10/2021                                                                                                                   Page 2 of 11
            The World Bank                                                                                     Implementation Status & Results Report
            Moldova Education Reform Project (P127388)



                                      Holban” Lyceum in Carpineni village, Hincesti Rayon; 11.”Alexandru Agapie” Lyceum in Pepeni village,
                                      Singerei Rayon; 12 ”Vasile Alecsandri” Lyceum in Colibasi village, Cahul Rayon.
                                      The rehabilitation works are underway in 5 schools, which include: 1. “Petru Rares” Lyceum in Soroca
                                      Town; 2. “Mihai Eminescu” Lyceum in Anenii Noi Town; 3. “Alexandru cel Bun” Lyceum in Rezina Town;
                                      4. “Ion Pelivan” Lyceum in Razeni village, Ialoveni rayon; 5. „Alecu Russo” Lyceum in Cojusna village,
                                      Straseni Rayon.

    IN01030513
    ►Trained teachers demonstrating a defined minimum level of competency for objectives covered in training program (Percentage, Custom)

                                      Baseline                     Actual (Previous)             Actual (Current)           End Target

    Value                             0.00                         0.00                          0.00                       50.00

    Date                              14-Sep-2017                  31-Dec-2020                   30-Aug-2021                31-Dec-2022
                                      The trainings are currently taking place. This indicator will be measured only after the training of teachers
                                      is delivered and teachers have had the chance to practice the new competencies. The measurement of
                                      teachers' new competencies will be done using the TEACH instrument. However, since TEACH does not
   Comments:                          cover all competencies covered by the training, Ministry of Education is expected to develop the
                                      instruments to be used for the other competency area by end of October 2021. The measuring of
                                      competencies through the classroom observations are expected to take place in 2022.



   Strengthen the Recipient’s education monitoring systems

    IN01030508
    ►School report cards with comparative data on school performance (2014-2018) publicly disseminated (Number, Custom)

                                      Baseline                     Actual (Previous)             Actual (Current)           End Target

    Value                             0.00                         7.00                          7.00                       5.00

    Date                              04-Dec-2012                  31-Dec-2020                   30-Aug-2021                31-Dec-2022

                                      The target has been exceeded.
   Comments:



   Promoting efficiency reforms in the education sector

    IN01030509
    ►Student-teacher ratio for Grades 1-12 of primary and general secondary education (Text, Custom)

                                      Baseline                     Actual (Previous)             Actual (Current)           End Target

    Value                             10.85:1                      12.4:1                        12.4:1                     11.85:1

    Date                              04-Dec-2012                  31-Dec-2020                   30-Aug-2021                31-Dec-2022

                                      The target has been exceeded.
   Comments:



 Intermediate Results Indicators by Components



   Component 1 - Strengthening the Quality of Education

    IN01030512

9/10/2021                                                                                                                     Page 3 of 11
            The World Bank                                                                                   Implementation Status & Results Report
            Moldova Education Reform Project (P127388)




    ►New minimum quality assurance standards formally adopted by MOE (Yes/No, Custom)

                                      Baseline                     Actual (Previous)           Actual (Current)          End Target

    Value                             No                           Yes                         Yes                       Yes

    Date                              04-Dec-2012                  31-Dec-2020                 30-Aug-2021               31-Dec-2022

                                      The target was achieved.
   Comments:

   IN01030516
   ►Additional receiving schools that meet infrastructure requirements under national quality assurance standards financed by the national
   budget (Number, Custom)

                                      Baseline                     Actual (Previous)           Actual (Current)          End Target

    Value                             0.00                         6.00                        6.00                      6.00

    Date                              04-Dec-2012                  31-Dec-2020                 30-Aug-2021               31-Aug-2018

    IN01030517
    ►Updated training program for school directors and teachers officially approved and implementation initiated (Text, Custom)

                                      Baseline                     Actual (Previous)           Actual (Current)          End Target
                                                                   Work plan to update the     Work plan to update       Work plan to update
                                      Existing program for         existing system for         the existing system for   the existing system for
                                      training of school           training of school          training of school        training of school
    Value
                                      directors and teachers to    directors and teachers      directors and teachers    directors and teachers
                                      be updated                   approved and pilot          approved and pilot        approved and pilot
                                                                   training completed.         training completed.       training completed
    Date                              04-Dec-2012                  31-Dec-2020                 30-Aug-2021               28-Jun-2019

    IN01030519
    ►School managers trained under the revised training program (Percentage, Custom)

                                      Baseline                     Actual (Previous)           Actual (Current)          End Target

    Value                             0.00                         27.96                       27.96                     50.00

    Date                              04-Dec-2012                  31-Dec-2020                 30-Aug-2021               31-Dec-2022
                                      The training of about 700 school managers is being conducted in two parts. The first training took place
                                      over the summer 2021, and the second part is planned to take place from October 11- December 10,
   Comments:
                                      2021. The figures will be updated once the training is completed.

     IN01030536
     School managers trained in gender awareness (Percentage, Custom Supplement)

                                    Baseline                      Actual (Previous)           Actual (Current)           End Target

     Value                          0.00                          0.00                        0.00                       20.00

    IN01030521
    ►Number of additional qualified primary teachers resulting from project interventions. (Number, Corporate)

                                      Baseline                     Actual (Previous)           Actual (Current)          End Target

    Value                             0.00                         627.00                      627.00                    800.00



9/10/2021                                                                                                                   Page 4 of 11
            The World Bank                                                                                   Implementation Status & Results Report
            Moldova Education Reform Project (P127388)




    Date                              04-Dec-2012                 31-Dec-2020                  30-Aug-2021                31-Dec-2022

    IN01030522
    ►Primary and general secondary teachers trained under the revised training program (Percentage, Custom)

                                      Baseline                    Actual (Previous)             Actual (Current)          End Target

    Value                             0.00                        10.46                        10.46                      20.00

    Date                              04-Dec-2012                 31-Dec-2020                  30-Aug-2021                31-Dec-2022
                                      The remaining training of 2,500 teachers will take place between August 2021 to January 2022. The delay
                                      in delivering the training is due to the need to adjust the training for online delivery due to the COVID19
   Comments:                          pandemic. The classroom observations to determine the skills acquired by teachers, which will inform the
                                      PDO indicator, are expected to take place during 2022.

     IN01030537
     Primary and general secondary teachers trained in gender awareness (Percentage, Custom Supplement)

                                    Baseline                     Actual (Previous)            Actual (Current)            End Target

     Value                          0.00                        0.00                          0.00                        10.00

    IN01030523
    ►Support staff and psycho-pedagogues trained on in-depth skills in special education (Number, Custom)

                                      Baseline                    Actual (Previous)             Actual (Current)          End Target

    Value                             0.00                        20.00                        493.00                     450.00

    Date                              14-Sep-2017                 31-Dec-2020                  30-Aug-2021                31-Dec-2022
                                      The target has been exceeded, 20 trainers and 473 support staff and psycho-pedagogues have been
   Comments:                          trained.

    IN01030524
    ►Targeted schools equipped with new science labs and technology equipment (Number, Custom)

                                      Baseline                    Actual (Previous)             Actual (Current)          End Target

    Value                             0.00                        0.00                         0.00                       160.00

    Date                              14-Sep-2017                 31-Dec-2020                  30-Aug-2021                31-Dec-2022
                                      The procurement process has been launched in August 2021 for the purchase equipment for science labs
                                      and technology equipment. The procurement process is expected to be completed on time.
   Comments:


   IN01030525
   ►Targeted schools equipped with teaching/learning materials for students with disabilities and/or special educational needs (Number,
   Custom)

                                      Baseline                    Actual (Previous)             Actual (Current)          End Target

    Value                             0.00                        0.00                         100.00                     100.00

    Date                              14-Sep-2017                 31-Dec-2020                  30-Aug-2021                30-Apr-2022
   Comments:                          The special equipment and teaching/learning materials for students with disabilities and/or special
                                      educational needs have been delivered to 100 schools.


9/10/2021                                                                                                                   Page 5 of 11
            The World Bank                                                                                   Implementation Status & Results Report
            Moldova Education Reform Project (P127388)




    IN01030526
    ►National School Inspectorate Staff Trained (Number, Custom)

                                      Baseline                      Actual (Previous)          Actual (Current)          End Target

    Value                             0.00                          2,786.00                   2,786.00                  300.00

    Date                              14-Sep-2017                   31-Dec-2020                30-Aug-2021              31-Dec-2022
                                      The National School Inspectorate (NSI) has been reorganized and its successor is National Agency for
                                      Quality Assurance in Education and Research (NAQAER). The difference between the end-target and
   Comments:
                                      actual number is explained by the larger scope of NAQAER and the training of all staff.

    IN01030527
    ►System for learning assessment at the primary level (Yes/No, Custom)

                                      Baseline                      Actual (Previous)          Actual (Current)          End Target

    Value                             Yes                           Yes                        Yes                       Yes

    Date                              04-Dec-2012                   31-Dec-2020                30-Aug-2021              28-Jun-2019

     IN01030538
     Utility of the learning assessment system (Number, Custom Supplement)

                                    Baseline                       Actual (Previous)          Actual (Current)          End Target

     Value                          4.00                           4.00                       4.00                      4.00

    IN01030528
    ►Administration of revised national testing of all 4th grade students completed (Text, Custom)

                                      Baseline                      Actual (Previous)          Actual (Current)         End Target
                                                                    All 4th grade students     All 4th grade students   All 4th grade students
                                      Existing national tests       tested in Romanian         tested in Romanian       tested in Romanian
    Value                             and scoring guidelines        language and Math          language and Math        language and Math
                                      for all 4th grade             based on revised           based on revised         based on revised
                                                                    national testing           national testing         national testing
    Date                              04-Dec-2012                   31-Dec-2020                30-Aug-2021              31-Aug-2018

    IN01030529
    ►Administration of revised national testing of all 9th grade students completed (Text, Custom)

                                      Baseline                      Actual (Previous)          Actual (Current)         End Target
                                                                    All 9th grade students     All 9th grade students   All 9th grade students
                                      Existing national tests       tested in Romanian         tested in Romanian       tested in Romanian
    Value                             and scoring guidelines        language and Math          language and Math        language and Math
                                      for all 9th grade students    based on revised           based on revised         based on revised
                                                                    national testing           national testing         national testing
    Date                              04-Dec-2012                   31-Dec-2020                30-Aug-2021              31-Aug-2018

    IN01030530



9/10/2021                                                                                                                  Page 6 of 11
            The World Bank                                                                                 Implementation Status & Results Report
            Moldova Education Reform Project (P127388)




    ►Report analyzing results of national assessments publicly disseminated (Number, Custom)

                                      Baseline                   Actual (Previous)           Actual (Current)          End Target

    Value                             0.00                       4.00                        4.00                      3.00

    Date                              04-Dec-2012                31-Dec-2020                 30-Aug-2021               28-Jun-2019

    IN01030531
    ►Report analyzing Moldova's performance in PISA 2015 and PISA 2018 publicly disseminated (Text, Custom)

                                      Baseline                   Actual (Previous)           Actual (Current)          End Target
                                                                 PISA 2015 and PISA          PISA 2015 and PISA        PISA 2015 and PISA
    Value                             No report                  2018 reports publicly       2018 reports publicly     2018 reports publicly
                                                                 disseminated                disseminated              disseminated
    Date                              04-Dec-2012                31-Dec-2020                 30-Aug-2021               31-Dec-2022

    IN01030532
    ►Consolidated Education Management Information System (EMIS) covering pre-university education in place (Text, Custom)

                                      Baseline                   Actual (Previous)           Actual (Current)          End Target
                                                                 Currently, the VET
                                                                 module has been             Consolidated
                                                                 developed and the           Education
                                                                 maintenance of the          Management                Consolidated EMIS
                                      Existing school mapping
    Value                                                        system is provided by       Information System        including preschool
                                      system
                                                                 developing company.         (EMIS) covering pre-      and VET education
                                                                 Preschool module            university education in
                                                                 developed with grant but    place.
                                                                 not operational yet.
    Date                              04-Dec-2012                31-Dec-2020                 30-Aug-2021               31-Dec-2022

    IN01030533
    ►Large-scale primary/secondary learning assessments completed (Number, Custom)

                                      Baseline                   Actual (Previous)           Actual (Current)          End Target

    Value                             0.00                       23.00                       23.00                     30.00

    Date                              04-Dec-2012                31-Dec-2020                 30-Aug-2021               31-Dec-2022
   Comments:                          National Large-Scale Assessment (NLSA) includes assessment for grades 4, 9 and 12 and International
                                      Large-Scale Assessment (ILSA) includes Programme for International Student Assessment (PISA).
                                               Grade 4 assessment is administered for Math, Romanian and mother tongue if different from
                                                Romanian, in May every year. The results have been disseminated regularly from 2013 to 2019.
                                               Grade 9 national assessment is administered for math, Romanian, mother tongue if different
                                                from Romanian and Romanian and International History in May to June every year. The results
                                                have been disseminatedregularly from 2013 to 2019.
                                               Grade 12 national assessment (Baccalaureate) is administered for language of instruction,
                                                mother tongue, Romanian if different from mother tongue, foreign language, main subject, and
                                                an additional subject in June each year. Data have been publicly disseminated from 2013 to
                                                2019 (https://ance.gov.md/content/transparen%C8%9B)

                                      PISA includes the 2015 and 2018.
                                      There were no assessments in 2020 due to the pandemic and school closures.




9/10/2021                                                                                                                Page 7 of 11
            The World Bank                                                                                 Implementation Status & Results Report
            Moldova Education Reform Project (P127388)




    IN01030534
    ►Number of laptops provided to primary and secondary education students to access remote learning (Number, Custom)

                                      Baseline                   Actual (Previous)           Actual (Current)          End Target

    Value                             0.00                       --                          10,000.00                 10,000.00

    Date                              01-Apr-2020                --                          30-Aug-2021              31-Dec-2022



   Component 2 - Improving the Efficiency of the Education Sector

    IN01030511
    ►Total classes reorganized in primary and general secondary schools (Number, Custom)

                                      Baseline                   Actual (Previous)           Actual (Current)          End Target

    Value                             0.00                       3,501.00                    3,501.00                  980.00

    Date                              04-Dec-2012                31-Dec-2020                 30-Aug-2021              28-Jun-2019

                                      The Project was extended hence allowing a bigger reach.
   Comments:

    IN01030515
    ►Primary and general secondary schools that have their budgets approved according to the new per student formula (Percentage, Custom)

                                      Baseline                   Actual (Previous)           Actual (Current)          End Target

    Value                             38.00                      100.00                      100.00                    80.00

    Date                              04-Dec-2012                31-Dec-2020                 30-Aug-2021              28-Jun-2019



   Component 3 - Improving the Ministry’s Capacity to Monitor the Reform

    IN01030510
    ►System in place to closely monitor and mitigate drop outs in primary and general secondary schools (using EMIS) (Text, Custom)

                                      Baseline                   Actual (Previous)           Actual (Current)         End Target
                                                                 Dropout rates are           Dropout rates are        Dropout rates are
                                      No system in place to      determined using data       determined using data    determined using data
    Value                             monitor and mitigate       disaggregated at the        disaggregated at the     disaggregated at the
                                      dropouts                   level of schools and used   level of schools and     level of schools and
                                                                 in policy making            used in policy making    used in policy making
    Date                              04-Dec-2012                31-Dec-2020                 30-Aug-2021              31-Aug-2018

    IN01030514
    ►Students benefiting from direct interventions to enhance learning (Number, Corporate)

                                      Baseline                   Actual (Previous)           Actual (Current)          End Target

    Value                             0.00                       9,542.00                    10,042.00                 98,450.00

    Date                              06-Sep-2017                31-Dec-2020                 30-Aug-2021              31-Dec-2022


9/10/2021                                                                                                                Page 8 of 11
            The World Bank                                                                                       Implementation Status & Results Report
            Moldova Education Reform Project (P127388)



                                      This indicate will be updated in early 2022 after the National Bureau of Statistics releases the updated
                                      information. An increase in number of beneficiaries is expected given that several activities (related to
   Comments:
                                      infrastructure and equipment provision) were completed.

     IN01030535
     Students benefiting from direct interventions to enhance learning - Female (Number, Corporate Supplement)

                                    Baseline                     Actual (Previous)             Actual (Current)             End Target

     Value                          0.00                         4,940.00                      0.00                         49,000.00

   IN01030518
   ►Beneficiaries of rehabilitated schools who feel their concerns were considered in the planning and implementation process (Percentage,
   Custom)

                                      Baseline                     Actual (Previous)               Actual (Current)          End Target

    Value                             0.00                        0.00                             0.00                      70.00

    Date                              14-Sep-2017                 31-Dec-2020                      30-Aug-2021              31-Dec-2022
                                      For the school communities benefitting from school rehabilitation under Moldova Education Reform
                                      Project, Moldova Social Investment Fund (MSIF) carried out communication and outreach activities
                                      informing beneficiaries about the principles that guide project implementation. Furthemore, MSIF
                                      organized joint meetings with teachers, parents and the active members of the communities and
                                      discussed the priority rehabilitation works to be carried out under the Project. On May 29, 2020, the
                                      MoECR hired a firm to conduct two beneficiary surveys under MERP to assess the level of satisfaction
   Comments:
                                      with the engagement process. Fieldwork for the survey to determine if users/providers felt that their
                                      concerns/recommendations were properly considered in the renovation process started in March 2021 in
                                      12 out of 17 rehabilitated schools. For the remaining five schools where works are ongoing, the data
                                      would be collected after their rehabilitation is completed completion which is expected to happen by
                                      October 2021.

    IN01030520
    ►Schools where parents report that information, community engagement, and school responsiveness has improved (Percentage, Custom)

                                      Baseline                     Actual (Previous)               Actual (Current)          End Target

    Value                             0.00                        0.00                             0.00                      70.00

    Date                              14-Sep-2017                 31-Dec-2020                      30-Aug-2021              31-Dec-2022
                                      On May 29, 2020, the Ministry of Education, Culture and Research hired a company to conduct a survey
                                      at the national level to determine parents’ opinion if there was an improvement in information, community
                                      engagement and school responsiveness due to use of school report cards, awareness campaigns and
   Comments:
                                      other methods and tools. Field work has taken place. While this was delayed due to the pandemic, the
                                      contractor is finalizing the report, and the data will be available at the end of February 2021.



 Performance-Based Conditions



 Data on Financial Performance


 Disbursements (by loan)

 Project        Loan/Credit/TF   Status      Currency       Original     Revised       Cancelled      Disbursed       Undisbursed             % Disbursed




9/10/2021                                                                                                                      Page 9 of 11
            The World Bank                                                                               Implementation Status & Results Report
            Moldova Education Reform Project (P127388)




 P127388        IDA-51960         Effective   USD             40.00     40.00           0.00         36.18             0.85                   98%

 P127388        IDA-61810         Effective   USD             10.00     10.00           0.00          5.27             4.83                   52%


 Key Dates (by loan)

 Project         Loan/Credit/TF   Status      Approval Date    Signing Date     Effectiveness Date     Orig. Closing Date     Rev. Closing Date

 P127388         IDA-51960        Effective   24-Jan-2013      07-Feb-2013      01-Jul-2013            31-Aug-2018            31-Dec-2022
 P127388         IDA-61810        Effective   16-Feb-2018      12-Mar-2018      19-Jul-2018            30-Jun-2020            31-Dec-2022


Cumulative Disbursements




 PBC Disbursement

                                                                                     Achievement      Disbursed amount in       Disbursement %
 PBC ID                      PBC Type   Description           Coc     PBC Amount
                                                                                     Status           Coc                       for PBC




  Restructuring History

  Level 1 Approved on 30-Jun-2015 ,Level 1 Approved on 06-Feb-2017 ,Level 2 Approved on 21-Sep-2017 ,Level 2 Approved on 24-Sep-2019
  ,Level 2 Approved on 10-Aug-2021

  Related Project(s)




9/10/2021                                                                                                              Page 10 of 11
            The World Bank                               Implementation Status & Results Report
            Moldova Education Reform Project (P127388)




 P156657-Moldova Education Reform Additional Financing




9/10/2021                                                             Page 11 of 11