76142 Environmental and Social Screening and Assessment Framework For The Republic of South Sudan Interim Strategy Note FY13and FY14 February 2013 Abbreviations and Acronyms ARAP Abbreviated Resettlement Action Plan CPA Comprehensive Peace Agreement DfID Department for International Development EA / ESIA Environmental (and Social Impact) Assessment EMP Environmental Management Plan ESSAF Environmental and Social Screening and Assessment Framework FCS Fragile and Conflict-affected Situations GRSS Government of the Republic of South Sudan IDA International Development Association IFC International Finance Corporation ISDS Integrated Safeguards Data Sheet ISN Interim Strategy Note LGSD Local Government and Service Delivery LICUS Low-income Country Under Stress MDG Millennium Development Goal MDTF Multi-Donor Trust Fund MDTF-SS Multi-Donor Trust Fund for Southern Sudan MoE Ministry of Environment OP Operational Policy PAD Project Appraisal Document PF Process Framework PMP Pest Management Plan RAP Resettlement Action Plan SPLA Sudan Peoples’ Liberation Army SPLM Sudan Peoples’ Liberation Movement SSDP South Sudan Development Plan SSRA South Sudan Roads Authority SSTTF South Sudan Transitional Trust Fund TT Task Team TTL Task Team Leader ToR Terms of Reference WDR World Development Report 2 Table of Contents Abbreviations and Acronyms .................................................................................................................................... 2 PART A: INTRODUCTION TO ESSAF .......................................................................................................................... 4 Section AI: Context .................................................................................................................................................. 5 Section AIII: Structure and Content ......................................................................................................................... 8 PART B: SAFEGUARDS POLICY GUIDANCE .............................................................................................................. 10 PART C: SAFEGUARDS PROCESSING GUIDANCE ..................................................................................................... 15 PART D: DETAILED POLICY AND PROCESSING RESOURCES .................................................................................... 19 Annex 1: List of Negative Project Attributes .......................................................................................................... 20 Annex 2: Codes of Practice for Prevention and Mitigation of Adverse Environmental and Social Impacts .......... 22 Annex 3: Threshold for Placement in Category A .................................................................................................. 27 Annex 4: Environmental and Social Assessment Screening Form ......................................................................... 29 Annex 5: Guidelines for Managing Physical Cultural Resources ........................................................................... 37 Annex 6: Guidelines for Land and Asset Acquisition ............................................................................................. 40 Annex 7: Guidelines for Incorporating Indigenous Peoples in the Project ............................................................. 46 Annex 8: Guidelines for Preparing Environmental Management Plans and Pest Management Plans .................... 48 Annex 9: Guidelines for Preparing Abbreviated Resettlement Plans, Resettlement Action Plans and Process Frameworks ............................................................................................................................................................. 51 3 PART A: INTRODUCTION TO ESSAF 4 Section AI: Context The Government of the Republic of South Sudan (GRSS) prepared the South Sudan Development Plan 2011- 2013 (SSDP) which lays out the national strategy for reconstruction and nation building. Priorities of the strategy include enhancing governance and investing in agriculture and infrastructure as well as improving delivery of basic social services. The World Bank’s Interim Strategy Note (ISN) for FY13/14, is framed within the scope of the SSDP. During the ISN period, an indicative IDA16 allocation has been set at US$131 million. The Bank financed program is comprised of two clusters: (i) improving economic management and governance for effective local service delivery, and (ii) expanding productive employment opportunities. The first cluster is designed to address the challenges of effective utilization of oil revenues. This cluster supports development of institutions for effective economic governance and improved welfare of the population. Bank financed operations in the first cluster include a Statistical Capacity Development Project and a Local Governance and Service Delivery Project. The second cluster seeks to address stresses related to the underdeveloped non-oil economy and the populations’ extreme economic deprivation; by developing core institutions and improving connectivity by building infrastructure it will lay the basis for a market-based economy. Bank financed operations in this cluster include the Juba-Kenya Highway Project and a Skills Development Project. The proposed Bank-financed operations during the ISN period are presented in Table 1. Table 1: FY13/14 Pipeline for IDA funding Project Amount (US$ millions) Local Governance and Service Delivery 50 Program Juba-Kenya Highway 50 Skills Development Project 23 Statistical Capacity Building Project 8 Total 131 Given the current operating environment in South Sudan, the ISN lays out the approach for a time-limited alternative regime for application of Bank operational policies. With respect to compliance with the Bank’s safeguard policies, the proposed arrangements include application of this national Environmental and Social Screening and Assessment Framework (ESSAF) to all Bank-financed operations during the ISN period. The national ESSAF is designed to enable the GRSS and World Bank staff to use risk-based procedures adapted to a complex and changing environment so as to support judicious risk taking to improve efficiency and results and to reduce transaction costs on a project by project basis. The ISN identifies the following elements for ensuring that implementation of the program provides the right balance of risk and flexibility in terms of safeguards compliance, as follows: 5 • Prepare a national ESSAF for South Sudan that anticipates the entire scope of environmental and social screening required as well as the basic principles of good environmental and social practice and diligent management required for all lending operations under the ISN. • Apply the national ESSAF to all Category B and C Bank-financed projects implemented in South Sudan during the ISN Period. • This ESSAF would only apply to Category A Bank-financed operations that are considered emergency projects. However, in all cases, the justification for using these special considerations would be included in Project documents. Section AII: Rationale, Objective and Scope The national ESSAF has been prepared in line with Bank operational policies and procedures for investment operations and the guidance note for crises and emergency operations for application of Bank safeguard and disclosure policies. The ESSAF was prepared to provide the basis for simplifying the application of Bank safeguard policies and related provisions of the Bank’s disclosure policy to all Bank-finance operations in South Sudan during the ISN period. The ESSAF explains the set of safeguard policies, guidelines, codes of practice and procedures to be integrated into all Bank-financed operations in South Sudan during the ISN period. The ESSAF will remain in effect throughout the ISN period and will have a sunset clause that, at the end of FY14, permits the Bank to evaluate whether to continue its application or revert to standard application of Bank safeguard policies. Rationale The rationale for applying a national ESSAF to all Bank-financed operations under the ISN period is as follows: • The ESSAF is the World Bank’s standard safeguard instrument used in Rapid Response Operations. By developing a national ESSAF, efficiency is gained by reducing the time and transaction costs associated with preparing individual project ESSAFs. • The GRSS is in the process of being established and current line ministry capacity is extremely weak, thereby limiting the ability to ensure preparation of safeguard instruments in accordance with the usual processing timeline required by Bank safeguard policies, particularly at the local level where Bank operations will be implemented. • Parts of South Sudan, particularly along the border with Sudan, remain unstable and highly volatile; and • In some cases, it may be difficult to conduct public consultations and to disclose documents due to ongoing conflicts in certain regions of the country; in such cases, consultation and disclosure will take place as close as possible to the project area. Ultimately, all stakeholders expect the ESSAF to facilitate production of high quality safeguards instruments, resulting in comprehensive identification, mitigation and management of adverse impacts, and overall enhancement of positive outcomes generated by project investments. The ESSAF is a country level safeguards instrument tailored to provide clear guidance on appropriate application of World Bank safeguard policies in 6 Bank-financed operations implemented throughout the ISN period. The ESSAF will also guide identification and preparation of project and sub-project specific safeguards instruments. Objective The objective of the national ESSAF is to provide pragmatic operational guidelines and procedures to the GRSS to eliminate, reduce and/or mitigate the environmental and social risks associated with Bank-financed operations implemented under the ISN during FY13 and FY14. The ESSAF is designed to: • Provide a framework for integration of social and environmental considerations in all stages of project design and execution to promote positive environmental and social outcomes of all Bank-financed interventions. And, to prevent environmental degradation and adverse social impacts as a result of project and subproject activities and/or their cumulative impacts; • Ensure compliance with World Bank safeguard policies; • Prevent or compensate any loss of livelihood; • Protect human health; • Ensure appropriate institutional arrangements for implementing measures detailed in the ESSAF. • Offer practical advice on how to integrate safeguards considerations into project preparation and implementation; • Facilitate access to country-specific information on physical, biological and social conditions; and • Support and facilitate preparation of safeguards instruments (ESIA, ESMP, RPF, RAP) by providing relevant information on the standard content and structure of each type of instrument. The ESSAF will facilitate the scoping process for selection, preparation and implementation of appropriate safeguard instruments for each operation. Given the current operating environment in South Sudan and the limited institutional capacity and knowledge with respect to World Bank safeguard policies, the simplification process presented in the ESSAF permits for detailed preparation of the required safeguards instruments to take place during implementation. It should be noted that while this ESSAF provides for changes in the timing of processing safeguard instruments, and presents practical guidance for safeguards practice in a highly challenging environment, it is not intended to introduce substantive modifications to the application of World Bank safeguard policies in South Sudan nor does it diminish the need for projects to comply with the policies. Scope The ESSAF applies to all Bank-financed operations implemented during the ISN period in the Republic of South Sudan. However, some project types are excluded from the ESSAF’s coverage as they are deemed to be too complex to be processed under the ESSAF. A “negative list� of such projects is compiled in Part D, Annex 1. Guiding Principles Ensuring due diligence in managing potential safeguard related risks will remain the primary objective of the Bank’s approach to managing environmental and social safeguard considerations in South Sudan. The guiding principles detailed below are intended to establish an appropriate balance between speed and risk mitigation with respect to safeguards. World Bank staff should address safeguard issues, including consultation and disclosure, in a flexible yet timely manner during preparation and supervision of all operations. 7 As such, for each operation the following principles apply: 1. The national ESSAF will be used for all Bank-financed operations implemented during the ISN period of FY13 and FY14. 2. The national ESSAF will guide identification and preparation of all project-specific safeguard instruments. 3. Project-specific Integrated Safeguards Data Sheets (ISDS) 1 will indicate the project category and the set of safeguard policies triggered for the complement of investments to be financed by the project. 4. An Appraisal-stage Integrated Safeguards Data Sheet (will be prepared for all Category A and B projects. 5. A Concept-stage ISDS will be prepared for all Category C projects. 2 6. Projects may support multiple subprojects, the detailed design of which may not be known at appraisal. To ensure effective application of safeguard policies, the ESSAF provides guidance on the safeguards approach to be taken during implementation of subprojects. 7. Projects and sub-projects that finance technical assistance to prepare pre-feasibility and feasibility studies for subsequent investments will include the environmental and social assessment processes. Section AIII: Structure and Content The ESSAF is comprised of the following elements: • Section A: ESSAF Context  Background on the ISN  Rationale  Objective  Scope  Guiding principles • Section B: World Bank Operational Policy Guidance • Section C: Policy Processing Guidance  Screening and EA classification  Required safeguard instruments  Sequencing and timelines  Clearance requirements  Disclosure requirements  Institutional Roles and Responsibilities • Section D: Policy and Processing Resources  Description of standard structure and expected content for each safeguard instrument  Implementation guidelines for specific OPs 1 For projects processed under OP/BP 8.00, Rapid Response to Crises and Emergencies, the ISDS should be prepared using the Operations Portal. In the Operations Portal, for category “A� and “B� projects, select the “Roadmap� tab, under “Preparation� select “Prepare Integrated Safeguards Datasheet (Appraisal- stage)�. You may disregard the system prompts for creating a Concept-stage ISDS and move to creating a “blank� PAD. The system will then allow you to create the Appraisal-stage ISDS. 2 For Category “C� projects, select the “Roadmap� tab, under “Identification� select “Prepare Project Concept Note� to create a “blank� PCN. Then, select “Prepare Integrated Safeguards Datasheet (Concept-stage)� to create ISDS. 8 While policy (part B) and processes (part C) remain valid throughout the ISN period, part D is a living document that may be updated throughout the ESSAF period by the Bank safeguards specialist assigned to RSS in close consultation with the Bank’s Regional and/or FCS Safeguards Adviser. Currently Part D contains the following information in the form of Annexes to this ESSAF: • Annex 1: Negative list of subproject attributes. • Annex 2: List of potential adverse environmental and social impacts of the set of operations proposed in the ISN as well as the associated mitigation measures. • Annex 3: Thresholds for projects classified as Category A. • Annex 4: Detailed environmental and social safeguards screening form and processing guidelines for project financed activities. • Annex 5: Guidelines for managing physical cultural resources. • Annex 6: Guidelines for land and asset acquisition. • Annex 7: Guidance on Indigenous Peoples policy application. • Annex 8: Guidelines for preparing Environment Management Plans and Pest Management Plans. • Annex 9: Guidelines for preparing Abbreviated Resettlement Action Plans, Resettlement Action Plans and Process Frameworks. 9 PART B: SAFEGUARDS POLICY GUIDANCE 10 Policy Application The table below covers each of the Bank’s safeguards policies. The first column contains the requirements of a specific policy and the special elements associated with each to be considered given the context of South Sudan. The second column provides guidance on the specific measures and actions required of each party to comply with Bank policy. The third column lists the range of safeguard instruments that may be adopted and the manner in which to integrate and verify environmental and social due diligence requirements are embedded in tender and contract documents, technical designs, site management plans and other safeguards related project documents. Environmental Assessment ESSAF Guidance Implementation Arrangements (OP 4.01) The Bank will screen all projects The Bank’s safeguards specialist(s) will The Bank will review and approve early in the identification stage, prepare an Appraisal-stage ISDS for the safeguards instruments prepared determine the project boundaries Category A and B projects, in which the by the Borrower for impact and classify projects into the category and appropriate safeguard identification and appropriateness of appropriate safeguards category. instruments and provisions are proposed mitigation measures. documented. For category C projects, a A detailed screening form will be Concept-stage ISDS will be prepared. The Practical guidance on key EA prepared for each project and FCS and/or Regional Safeguards Adviser instruments is presented in the subproject and reviewed by the will review and clear the ISDS for all Annexes of this ESSAF. Task Team to ensure proper projects. processing according to Bank safeguards policies. For all Category A and B projects and subprojects, the Borrower holds primary responsibility to plan and implement the safeguards instruments specified in the ISDS. These may be an Environmental and Social Impact Assessment (ESIA) and corresponding management instrument (e.g. ESMP). Depending on the project context, the appropriate instruments may also be safeguards clauses to be integrated into technical specifications for civil works, goods and services contracts. The type, scope and detail of the safeguards instruments will be agreed between the Borrower and Bank during preparation. For all projects, preparation of safeguards instruments may be deferred to implementation, but must be completed, including identification and planning of appropriate mitigation measures of all project and subproject impacts, before beginning the actual civil works. Before starting construction, the Bank will review and approve the environment and social impact mitigation measures to be attached to the respective tender or contract documents. 11 Natural Habitats (OP 4.04) ESSAF Guidance Implementation Arrangements This policy will be addressed as an Potential impacts on critical and non- Task Team to review application of integral part of the environmental critical natural habitats will be considered ESSAF guidelines to ensure natural assessment process. and addressed through the EA process habitats considerations have been adequately addressed through project The presence of critical and non-critical and subproject-specific EA natural habitats in the footprint of a Bank- processes. financed operation will be identified during the screening process. Forests (OP 4.36) ESSAF Guidance Implementation Arrangements This policy will be addressed as an Potential impacts on forests and forestry Task Team to review project integral part of the environmental operations to be considered and addressed application of ESSAF guidelines to assessment process. through the EA process. ensure forests and forestry sector considerations are adequately addressed through project and subproject-specific EA processes. Pest Management (OP 4.09) ESSAF Guidance Implementation Arrangements This policy will be addressed as an Potential purchase, distribution, Task Team to review project integral part of the environmental application, and/or disposal of pesticides to application of ESSAF guidelines to assessment process. be considered and addressed through the ensure pest management EA process. Specific technical guidance considerations have been adequately may be drawn from the Bank’s Pest addressed through the project and Management policy and guidelines. subproject-specific EA processes. General guidance on how to prepare a PMP is presented in Annex 8. Indigenous Peoples (OP4.10) ESSAF Guidance Implementation Arrangements In South Sudan, based on initial The Project Appraisal Document (PAD) Complementing earlier technical technical work inside and outside will include a brief summary of how the work, a social assessment will be the Bank, it appears that the project complies with the policy, in prepared for South Sudan, describing overwhelming majority of citizens particular the IPP requirements. and analyzing the ethnic groups and are likely to meet the policy’s their vulnerabilities. criteria. When Indigenous Peoples are the sole or the overwhelming The Task Team will ensure that IPP majority of direct project elements are reflected in the project beneficiaries, the elements of an design (see Annex 7). Indigenous Peoples Plan (IPP) should be included in the overall 12 Indigenous Peoples (OP4.10) ESSAF Guidance Implementation Arrangements project design, and a separate IPP is not required. Involuntary Resettlement ESSAF Guidance Implementation Arrangements (OP 4.12) During preparation, projects will be In the event that temporary or permanent Bank Task Team to ensure that all screened for the likelihood of the land acquisition is required or livelihoods land and asset acquisition need for resettlement, land are affected by project activities, the considerations have been fully acquisition and/or compensation for Borrower will follow the specific addressed as per ESSAF loss of assets or loss of access to guidelines for land and asset acquisition, guidelinesprior to beginning any civil assets. All subprojects will be entitlements and compensation as works. screened in the same manner during presented in Annex 9. implementation. Physical Cultural Resources ESSAF Guidance Implementation Arrangements (OP4.11) As part of the screening process the If this policy is triggered, chance finds If there are Physical Cultural Bank Team will check each project procedures will be considered in project Resources in the project area, the for potential impacts on physical and/or sub-project design and included Task Team will review project cultural resources and will adopt with the environmental and social implementation documents to ensure clear procedures for identification, safeguards provisions into tender and that adequate procedures are surveying, inventory, management contract documents. Also, the appropriate embedded in project and/or sub- and if required salvage / protection management of discovered artifacts will be project design, as well as tender and of cultural property from theft, included in environmental management s contract documents. vandalism or negligent damage or and standard bidding documents. destruction. The Task Team will follow up with Annex 5 provides guidelines for effective specific field-based assessments and management of known physical cultural inquiries on the implementation of resources and chance finds procedures. PCR management during supervision missions. Safety of Dams (OP 4.37) ESSAF Guidance Implementation Arrangements Not Applicable, as no dams will be N/A N/A financed during the ISN period, FY13 and FY14; and, none of the pipeline operations depend on an existing dam in order to achieve their PDO. 13 Projects on International ESSAF Guidance Implementation Arrangements Waterways (OP 7.50) During preparation, project If projects and/or subprojects are in Screening for whether the policy is activities will be screened for International Waterways, GRSS or the triggered will be carried out by the potential impacts on the quality or Bank will notify the riparians. Task Team in close consultation with quantity of water flow to the other the sector ministry’s safeguards focal riparians. In case these activities point during project preparation. qualify as exceptions, the Task Team Leader will prepare the memorandum for requesting an exception to the notification of the other riparians. Otherwise, the Bank will require that the Borrower notify other riparians or allow the Bank to notify the riparians at least 60 days before commencement of any of the project civil works associated with triggering of the policy Projects in Disputed Areas ESSAF Guidance Implementation Arrangements (OP 7.60) Projects will be screened to Projects and subprojects will be screened The Task Team will systematically determine the application of the to determine the application of the policy review project and subproject policy to projects in disputed areas, to projects in disputed areas, consistent screening and implementation consistent with current practice. with current practice. documentation and consult with the Bank’s Legal counsel on a case by case basis. 14 PART C: SAFEGUARDS PROCESSING GUIDANCE 15 This section describes the safeguard processing guidance to assist with integration of environmental and social management decisions into the planning stage of projects to ensure that potential impacts and practical measures are identified early in project preparation so as to avoid and/or mitigate adverse impacts that may be generated by Bank-financed interventions. In South Sudan, it is important to note that current practice for EIA processing is concentrated under sector ministries, since, at this time, there are no finalized Environmental Policies and Bills in place. As such, the EIA process is currently the responsibility of the project proponent by engaging an expert to carry out the EIA study. The Ministry of Environment reviews the EIA report and issues the formal authorization or no objection letter for implementation of the project. Going forward, the Ministry of Environment will play both a regulatory and implementation role until the planned Environmental Management Authority is established. Under the proposed Environmental Bill and Regulation, each line ministry will have a liaison unit to ensure legislative compliance of the ministry’s activities. The responsibility of the Ministry of Environment, as indicated under chapter 4, section 12, 2 (b) Functions of the Ministry of the draft Bill, is among others: to coordinate with Environmental liaison units in Lead Agencies, Review and approve Environmental Impact Assessment study reports of proposed projects and issue environmental Impact Assessment licenses; Review and approve Environmental Audit Reports, and Monitor and evaluate. Below is the standard approach for projects processed under the ESSAF. Project/Sub-project Screening and Safeguards Classification Process Implementation and Verification Timing The Task Team’s safeguards specialists, The safeguards screening form presented in Screening, EA classification in close consultation with the FCS or Annex 4 will be completed by the and policy triggering are one Regional Safeguards Advisor, screen the Borrower’s safeguards focal point and of the first activities during project (and subproject) with respect to its reviewed by the Bank’s Task Team. project identification, usually technical and physical features, concurrent with the environmental and social footprint, the The team explains the rationale for the preliminary design stage of a prevailing baseline and associated proposed EA category, as well as the project, i.e., before a design vulnerabilities, and propose an rationale for triggering or not triggering has gone through the required appropriate EA Category based on the specific safeguards policies in detail in the approval process. ESSAF guidelines. The EA category is Concept-stage ISDS and proposes the scope documented in the Concept-stage ISDS. of safeguards instruments required. A project may consist of a number of individual The Task Team’s safeguards specialists The FCS and/or Regional Safeguards subprojects, which are known also determine which safeguards policies Adviser reviews the: (i) PCN and (ii) in type and scale, but not are triggered. Concept-stage ISDS to confirm EA category necessarily by location and and safeguard policies triggered. The FCS detailed technical and/or Regional Safeguards Adviser configuration by project confirms or proposes modifications to the effectiveness. In such cases, scope of safeguards instruments to be the Task Team ensures developed as a result of the preliminary subproject screening and project screening exercise and EA appropriate follow up action classification. is taken during project supervision missions. 16 All Bank-financed operations implemented during the ISN period will use the following project and subproject preparation and implementation guidelines with respect to the environmental and social assessment and management aspects of the project: 1. Screening: A detailed environmental and social assessment screening form for each subproject will be prepared using the form provided in Annex 4. 2. Land Acquisition: Guidelines for land and asset acquisition are presented in Annex 6. 3. Indigenous Peoples: Guidelines for incorporating Indigenous Peoples in the project are presented in Annex 7. 4. EMPs and PMPs: Guidelines for preparing Environmental Management Plans and Pest Management Plans are presented in Annex 8. 5. ARAPs, RAPS and PFs: Guidelines for preparing Abbreviated Resettlement Action Plans, Resettlement Action Plans and Process Frameworks are detailed in Annex 9. Preparation of Safeguards Instruments Process Implementation and Verification Timing The Borrower prepares all safeguard The Task Team reviews all required The Borrower may prepare instruments required for a specific project safeguard instruments. And, once the Task the required safeguard and subproject. This work will be Team is satisfied with the quality of instruments during supported by the Bank Team through safeguards instruments, the Borrower implementation but they technical assistance and advice. submits them to the Regional and/or FCS must be approved by the Safeguard Adviser for formal review and Bank and formally disclosed clearance. in country and at the InfoShop before civil works commence. Disclosure and Consultation World Bank consultation and disclosure requirements will be met based on the operating environment within which the project and/or subproject is prepared. All projects and subprojects will aim to include open and transparent consultations with local communities, project beneficiaries, project affected persons and other local and interested stakeholders with a specific view to solicit feedback from both genders to the extent possible based on prevailing conditions at the local level. It will remain the responsibility of the Borrower to conduct these consultations. The safeguard instruments for all projects will be disclosed at the InfoShop and in-country in English and the most appropriate local language to the extent possible based on local conditions. Process Implementation and Verification Timing The ESSAF will be shared with the The project implementing agency will The ESSAF will be disclosed GRSS, other development partners and initiate consultations as early as possible and at the World Bank’s concerned non-governmental provide relevant material in a timely manner InfoShop and in South Sudan organizations. to the public prior to the consultation event, once approved for disclosure in a form and language(s) understandable It will be disclosed in country and at the The PCN stage ISDS will be 17 Process Implementation and Verification Timing World Bank’s InfoShop. and accessible to the groups consulted. disclosed at the World Bank’s InfoShop after the For all projects financed by the Bank The Task Team will review the materials to PCN Review Meeting and during the ISN period, the relevant be presented at the consultations and advise once the Regional or FCS project implementing agency will consult the Borrower during their preparation. Safeguards Advisor has project-affected groups and local formally cleared it for nongovernmental organizations on the All safeguard instruments will be disclosed disclosure. project’s environmental and social by the Borrower in-country through available aspects, to the extent possible, and will methods based on prevailing conditions, as The Appraisal-stage ISDS take their views into account. well as through the World Bank’s InfoShop. will be disclosed at the World Bank InfoShop after the All subsequent safeguard instruments will be Decision Review Meeting formally reviewed and cleared by the FCS and once the Regional or and/or Regional Safeguards Advisor. FCS Safeguards Advisor has formally cleared it for disclosure. Client Capacity Building Throughout project implementation, Bank task teams will assess the status of application of the principles of the ESSAF and recommend appropriate capacity building interventions to the Borrower, as deemed necessary. Institutional Arrangements Select sector ministries will act as implementing agencies for Bank-financed operations alongside the respective State and Local Government Departments during the ISN period. Safeguards compliance is the responsibility of the concerned sector ministry. Each sector ministry will ensure that a focal unit is established and is staffed with qualified individuals who operate with sufficient budget and who are empowered to undertake the required technical and financial decisions on its behalf. The concerned ministry, contractors, consultants and engineers from specialized government agencies or private sector, who are involved in a given project, need to be cognizant of the project specific instruments and be responsible for implementation of the Environmental Management Plan (EMP) and other safeguard instruments in accordance with ESSAF guidelines. 18 PART D: DETAILED POLICY AND PROCESSING RESOURCES 19 Annex 1: List of Negative Project Attributes Subprojects with any of the attributes listed below will be ineligible for support under any of the Bank- financed operations during the ISN period. Attributes of Ineligible Subprojects Explanation Natural Habitats The management of natural resources, Concerning Activities that involve significant including sensitive and critical conversion or degradation of critical natural habitats, has not yet progressed to a habitats, regardless of their formal legal protection point in RSS where institutional status. Such habitats may e.g. include: stewardship and capacities exists • Wildlife Reserves sufficiently to effectively manage and • Ecologically-sensitive marine and terrestrial mitigate potential impacts on habitats. ecosystems • Parks or Sanctuaries • Protected areas, natural habitat areas • Forests and forest reserves • Wetlands • National parks or game reserves • Any other environmentally sensitive areas Physical Cultural Resources PCR play an extremely important and Damage physical cultural resources, sensitive role in the country’s cultural notwithstanding the type of PCR and the scale of the identity. The management of physical damage. Such PCR may e.g. include, but would not cultural resources, including the be limited to: definition and implementation of • Archaeological sites, structures or objects chance find procedures, salvage digs • Religious monuments or structures and the safe storage of salvaged PCR, • Works of art, artifacts has not yet progressed to a point in • Natural sites or objects, e.g. trees, rocks, rock RSS where institutional stewardship formations, hills, forests, rivers (or their sources) or and capacities exists sufficiently to lakes with cultural or religious values effectively manage and mitigate • Cemeteries, graveyards, and graves potential impacts on PCR. The well • Sites of any other cultural or religious significance justified relocation of cemeteries, graveyards and graves may be undertaken on a case by case basis in full coordination with religious authorities and local communities. Dams Both the construction of large new New large dams 15 meters or more in height. Note: dams and irrigation systems, and the dams that are between 10 and 15 meters in height significant expansion of irrigated are treated as large dams if they present special agriculture can have significant large design complexities--for example, an unusually scale and long term impacts that large flood-handling requirement, location in a zone should be investigated in a strategic 20 of high seismicity, foundations that are complex and context before any projects are difficult to prepare, or retention of toxic contemplated. materials. Dams under 10 meters in height are For a strategic environmental and treated as large dams if they are expected to become social assessment sufficiently reliable large dams during the operation of the facility. data bases need to be created, Irrigation including hydrological, New large scale irrigation and drainage schemes, as meteorological, climate-related studies, well as the significant expansion of irrigated covering contexts and scales from agricultural areas. regional to country to river basin. Income Generating Activities For these activities the capacities and Activities involving the use of fuel wood, except experience in RSS are perceived when harvested from sustainably managed existing currently too low to allow to plantations. effectively manage and enforce Activities involving the use of hazardous environmental due diligence during substances. implementation. Activities involving the collection of natural products (e.g. non timber forest products) on a commercial scale. 21 Annex 2: Codes of Practice for Prevention and Mitigation of Adverse Environmental and Social Impacts A brief description of potential adverse environmental and social impacts that may be generated by sector-specific interventions financed by the IDA 16 portfolio are presented in the matrix below along with the set of standard mitigation measures to be adopted. Note: the matrix below is indicative and should be complemented by the sector-specific guidelines for safeguards management once the latter are developed and vetted by the GRSS and the Bank. The World Bank Group’s General Environmental Health and Safety (EHS) Guidelines include comprehensive treatment in the following areas: Environment, Air Emissions and Ambient Air Quality, Energy Conservation, Wastewater and Ambient Water Quality, Water Conservation, Hazardous Materials Management, Waste Management, Noise, Contaminated Land, Occupational Health and Safety, General Facility Design and Operation, Communication and Training, Physical Hazards, Chemical Hazards, Biological Hazards, Radiological Hazards, Personal Protective Equipment, Special Hazard Environments, Monitoring, Community Health and Safety, Water Quality and Availability, Structural Safety of Project Infrastructure, Life and Fire Safety, Traffic Safety, Transport of Hazardous Materials, Disease Prevention, Emergency Preparedness and Response, Construction and Decommissioning, Environment, Occupational Health & Safety, Community Health & Safety. These guidelines should be applied in order to ensure compliance with Bank policies. Sector Adverse Environmental and Social Impacts Mitigation Measures Agriculture Livestock: Unsustainable grazing. Preparation of an EMP that would include the following features, depending on the type of Includes investments in Slaughterhouse waste runoff affecting clean investment: livestock (grazing, water supply. slaughterhouses, Before livestock are purchased, grazing veterinary clinics), Construction disturbances (dust, noise, requirements for the new herd should be fisheries, forestry and contamination from inadequate sanitation calculated and legal access to sufficient irrigation facilities) for infrastructure renovations such sustainable grazing ensured. as wholesale food markets, laboratories, research centers, training centers, holding Ongoing TA to strengthen slaughterhouse and grounds, quarantine points and livestock holding ground sanitary inspection and production infrastructure (rehabilitation of certification services should be provided and water points and stock routes), temporary training for meat inspectors on consistent and/or permanent displacement of environmental quality control measures should communities or loss of assets. be offered. Inadequate handling and disposal of veterinary Adoption of standard technical specifications for waste (including vaccines, drugs, syringes). construction to minimize adverse impacts. Fisheries: Improper distribution, application, Access to veterinary services should be storage or disposal of bactericides used in fish established at holding grounds with adequate and processing activities. secure mechanisms (including preparation of a veterinary medical waste management plan) for Forestry: Adoption of improved technologies veterinary waste disposal to prevent cross- 22 in agro-forestry designed to promote contamination. innovation (e.g. seed multiplication, water management, organic farming, farm power, Preparation of a Integrated Pest Management improved varieties) may lead to soil erosion, approach for fisheries sector activities to ensure land degradation, displacement, deforestation, proper handling, use and disposal of bactericides. habitat destruction and loss of fauna and flora. Soil and water conservation interventions. Irrigation: Preparation of a RAP or ARAP Siltation and erosion. Plan disposal of spoil material from cleaned Water-logging and salinization. canals to ensure it will not wash back into the system, and is not deposited on fields. Over-exploitation of aquifers. Re-grading and rehabilitation of borrow areas or pits. Incorporation of adequate drainage to prevent water-logging and salinization. Analysis of the sustainability of groundwater yield, if increased abstraction is proposed. Housing and Public Disease caused by inadequate provision of Environmentally appropriate site selection led by Buildings water and sanitation services. application of the environmental and social screening form provided in Annex 4, design and Construction or Deforestation caused by unsustainable use of construction guidance, and a procedure for timber and wood-firing of bricks. ensuring that this guidance is followed before rehabilitation of public construction is approved. office building, clinics, schools, administrator Generation of waste materials. Replace timber beams with concrete where housing structurally possible. Disturbances during construction (dust, noise) and contamination from inadequate sanitation Ensure fired bricks are not wood-fired. Where facilities. technically and economically feasible, substitute fired bricks with alternatives, such as sun-dried Acquisition of land. mud bricks, compressed earth bricks, or rammed earth construction. Ensure engineering designs include adequate sanitary latrines and access to safe water. Handling of waste during building renovation will require appropriate disposal of waste materials and the protection of the workforce in the event of asbestos removal or that of other toxic materials. Preparation of a RAP or ARAP. Health Environmental pollution and human Preparation of a medical waste management plan contamination from the following waste to include the following elements: Health Care Waste is 23 defined as the total streams: Purchase of medical supplies and their disposal waste stream from a in accordance with WHO guidelines. And, healthcare ·Infectious waste has the potential of appropriate handling and disposal guidelines for establishment. transmitting infectious agents to humans (e.g., all types of medical waste according to the cultures and stocks; tissues; dressings, swabs WB/IFC Environmental Health Guidelines. or other items soaked with blood; syringe needles; scalpels; diapers; blood bags). Segregation of materials which are able to be reused or recycled to reduce the impact burden of ·Anatomic waste consists of recognizable this waste stream. body parts. ·Pharmaceutical: Consisting of or containing pharmaceuticals, ·Chemical waste Consisting of or containing chemical substances. ·Heavy Metals: Consisting of materials and equipment with heavy metals and derivatives (e.g., batteries, thermometers). ·Radioactive materials: Include unused liquids from radiotherapy or laboratory research. Sanitation Water supply contaminations, including: Where pit latrines are used they should be Groundwater contamination due to seepage located more than 10m from any water source. Latrines and contamination of surface waters due to The base should be sealed and separated vertically by not less than 2m of sand or loamy flooding or over-flowing. soil from the ground water table. Disease caused by poor handling practices of Where latrines or septic tanks are built they waste, including inadequate excreta disposal should be sealed. Outflows should drain either to or inappropriate use of latrines. an appropriate channel located at least 10m from any water source or be connected to a working drain. Septic tanks should not be constructed nor septic waste collected unless primary and secondary treatment and safe disposal is available. Due diligence to siting requirements for construction of Ventilated Improved Pit latrines to avoid contamination of wells and the water table. Waste should be handled using protective clothing to prevent any contamination of workers skin or clothes. Protective clothing and appropriate containers for waste transportation to be provided. Where waste is collected for agricultural use it should be stored for a sufficient period to destroy pathogens through composting. At the minimum it should be stored in direct sunlight and turned regularly for a period of at least 6 weeks. 24 Health and hygiene capacity building program to be provided for all latrine users. Maintenance training to be delivered along with new latrines. Solid Waste Disease caused by inadequate collection and Solid waste management plan to include the disposal, including health risks from: pests, following elements: Solid waste generation burning of solid waste and industrial waste. Safe waste disposal awareness program. across sectors Contamination of water supply. Sufficient frequency of collection from transfer stations. Lateral seepage into surface waters. Containment of waste during collection and transfer. Seepage of contaminants into aquifers. Promote separation at source to reduce spreading Contamination from clandestine dumping. by waste-pickers during recycling. Minimize burning of plastics. Separate collection and disposal system for medical or hazardous waste. Assess requirement for additional investment in final disposal site. Site transfer stations should have sealed base and be located at least 15m away from water sources with the base separated vertically by not less than 2m of sand or loamy soil from the ground water table. Monitoring of disposal site to prevent illegal dumping. Transport Displacement of communities. Preparation of an EA, EMP and RAP or ARAP, with the following elements considered: Repair, rehabilitation Loss of shelter, income and assets. and maintenance of Design to prevent soil erosion and maintain slope Potential conflict over land use. stability. Physical stabilization of erodible priority roads and basic surfaces through turf establishment, planting a transport wide range of vegetation, and creating slope infrastructure Child labor. breaks. Health and HIV AIDs concerns with the influx of labor. Construction in the dry season. Degradation and erosion of lands. Protection of soil surfaces during construction. Accumulation of sediments in streams, Rehabilitation and re-grading of borrow pits and increase in runoff and flooding, disturbance of material collection sites. vegetation. Minimize loss of natural vegetation during Disruption of drainage. construction. Design to include accessibility to road sides in case roadbed is raised. Alternative alignments to avoid bisecting villages 25 by road widening. Provision of fuel at work camps to prevent cutting of firewood. Provision of sanitation at work camps. Removal of work camp waste, proper disposal of oil, bitumen and other hazardous wastes. Management of construction period worker health and safety. Water Supply Contamination by seepage from latrines, Preparation of an EA, EMP, RAP or ARAP, with municipal waste or agricultural areas. the following measures considered: Drilling new boreholes, construction of water Poor absorption, frequent runoff and Test water supply on a regular basis to detect ponds and repairing of contamination of water sources are among the contamination and ensure the adequacy of water boreholes major negative impacts that might arise from quality. inappropriate siting and engineering design. Repair and Siting of boreholes and open water reservoirs rehabilitation of Discharge of raw sewage to water bodies can decided through a screening and consultative existing water schemes. adversely affect water quality and aquatic life. process. Displacement of people from their homes and Removal of debris by screening at the discharge land, a reduction or loss of livelihood point or use of settlement ponds prior to activities and incomes; interruption or discharge. inconvenience of services rendered Connection to an existing sewage facility should High mineral concentrations. not be conducted without ensuring that the capacity of the existing system is adequate to Creation of stagnant pools of water. accommodate the additional collected sewage. Accident to human and livestock. Increase incidence of water borne disease. Impact on cultural and religious sensitive areas. Erosion 26 Annex 3: Threshold for Placement in Category A Threshold for Placement in Category ‘A’ Project/Subproject Activity Threshold Electricity Thermal Power Plants - Fuel type: crude oil and/or HFO: all cases - Fuel type: natural gas > 250 MW Overhead Transmission Lines Voltage > 220 V and length > 50 kms in urban and/or rural areas Solar and Wind Power Facilities Production > 50 MW Hydropower Reviewed by the Africa Region and OPCS on a case by case basis Transport Urban Roads and Bridges - For 2 lanes or more with length more than 2 kms - For fixed bridges across rivers and in urban areas Rural Roads For road segments of one lane or more with length of > 20 kms Water Supply and Sanitation Groundwater Development Production > 10,000 m3/year Artificial or Controlled Infiltration of Water Production > 10,000 m3/year Water Treatment Plants Capacity > 100,000 inhabitants Water Supply Distribution Networks Connection > 10,000 houses Sewage Collection Networks Connection > 10,000 houses Wastewater Treatment Plants Capacity > 50,000 inhabitants Solid Waste Management Sanitary Landfills Surface > 5 ha and/or for more than 80 tons/day Slaughterhouses Capacity > 300 sheep/day and/or 60 cattle/day Installations for Incineration of Non-Hazardous Capacity > 100 tons/day Waste 27 Project/Subproject Activity Threshold Hazardous Waste Treatment and Storage All cases Agriculture and Rural Development Dams for Water Storage Reviewed by the Africa Region and OPCS Inter-basin Transfer of Water Reviewed by the Africa Region and OPCS New Irrigation and Drainage Surface Area > 5,000 ha Rehabilitation of Irrigation and Drainage Surface Area > 10,000 ha Pest Management - Development of new irrigation land (> 5,000 ha) - When procurement of large quantities of pesticides is envisaged (> 1,000 l) - When new pest management practices are introduced Livestock Production When procurement of large quantities of pesticides is envisaged (> 500 l) Aquaculture Surface Area > 100 ha Health New Hospitals and Health Clinics Facilities with > 100 beds Healthcare (Hospital) Waste Facility or groups of facilities generating > 1 ton/day of hazardous healthcare wastes Vector Control - When procurement of DDT is envisaged - When procurement of large quantities of pesticides is envisaged (> 1,000 l) - When new vector management practices are introduced Education New Universities and Schools Facilities with > 1,000 students 28 Annex 4: Environmental and Social Assessment Screening Form This section outlines the selection criteria and associated Environmental and Social Assessment procedures to be applied when screening subprojects. This form is to be used by the PIU Safeguards Focal Point of the relevant sector ministry to screen all proposed subprojects. Environmental and Social Assessment Screening Form I Basic Data Sector: Line Ministry: Name of Project: Name of Subproject: Subproject Objective: Subproject Location: Civil Works to be rehabilitated: Estimated Subproject Costs: Proposed Date for Commencement of Work: Technical Specifications Reviewed: Yes __ No __ II Site Description Site Features Description Physical description of the site Site drainage Proximity of existing wells Types of soil Presence and type of vegetation What is the current land use? Who identified the site? Who is the owner of the land? 29 Who occupies the land? 30 III Project and/or Subproject Site Related Considerations Issues Yes No Comments Is the subproject located in an area with endangered or conservation worthy ecosystems, fauna or flora? Is the subproject located in an area within 500 meters of national forests, protected areas, wilderness areas, wetlands, biodiversity, critical habitats, or sites of historical or cultural importance? Is the subproject located in an area which would create a barrier for the movement of conservation-worthy wildlife? Is the subproject located close to groundwater sources, surface water bodies, water courses or wetlands? Is the subproject in an area that would require land acquisition or restriction of access to natural resources in a protected area? Is the subproject located in an area with designated cultural properties such as archaeological, historical and/or religious sites? Is the subproject in an area with religious monuments, structures and/or cemeteries? Is the subproject in a polluted or contaminated area? Is the subproject located in an area of high visual and landscape quality? Is the subproject located in an area susceptible to landslides or erosion? Is the subproject located in an area of seismic faults? Is the subproject located in a densely populated area? Is the subproject located on prime agricultural land? Is the subproject located in an area of tourist 31 importance? Is the subproject located near a waste dump? Does the subproject have access to potable water? Is the subproject located far (1-2 km) from accessible roads? Is the subproject located in an area with a wastewater network? Is the subproject located in the urban plan of the city? Is the subproject located outside the land use plan? IV Project and/or Sub-project Environmental and Social Considerations Zoning and Land Use Planning Issues Yes No Comments Will the subproject affect land use zoning and planning or conflict with prevalent land use patterns? Will the subproject involve significant land disturbance or site clearance? Will the subproject land be subject to potential encroachment by urban or industrial use or located in an area intended for urban or industrial development? Utilities and Facilities Issues Yes No Comments Will the subproject require the setting up of ancillary production facilities? Will the subproject make significant demands on utilities and services? Will the subproject require significant levels of accommodation or service amenities to support the work force during construction (e.g., contractor will need more than 20 workers)? 32 Water and Soil Contamination Issues Yes No Comments Will the subproject require large amounts of raw materials or construction materials? Will the subproject generate large amounts of residual wastes, construction material waste or cause soil erosion? Will the subproject result in potential soil or water contamination (e.g., from oil, grease and fuel from equipment yards)? Will the subproject lead to contamination of ground and surface waters by herbicides for vegetation control and chemicals (e.g., calcium chloride) for dust control? Will the subproject lead to an increase in suspended sediments in streams affected by road cut erosion, decline in water quality and increased sedimentation downstream? Will the subproject involve the use of chemicals or solvents? Will the subproject lead to the destruction of vegetation and soil in the right-of-way, borrow pits, waste dumps, and equipment yards? Will the subproject lead to the creation of stagnant water bodies in borrow pits, quarries, encouraging for mosquito breeding and other disease vectors? Noise and Air Pollution Hazardous Substances Issues Yes No Comments Will the subproject increase the levels of harmful air emissions? Will the subproject increase ambient noise levels? Will the subproject involve the storage, handling or transport of hazardous substances? Fauna and Flora Issues Yes No Comments Will the subproject involve the disturbance or modification of existing drainage channels (rivers, canals)or surface water bodies (wetlands, marshes)? Will the subproject lead to the destruction or damage of terrestrial or aquatic ecosystems or endangered species directly or by induced development? Will the subproject lead to the disruption/destruction of wildlife through 33 interruption of migratory routes, disturbance of wildlife habitats, and noise-related problems? Destruction or Disturbance of Land and Vegetation Issues Yes No Comments Will the subproject lead to unplanned use of the infrastructure being developed? Will the subproject lead to long-term or semi- permanent destruction of soils in cleared areas not suited for agriculture? Will the subproject lead to the interruption of subsoil and overland drainage patterns (in areas of cuts and fills)? Will the subproject lead to landslides, slumps, slips and other mass movements in road cuts? Will the subproject lead to erosion of lands below the roadbed receiving concentrated outflow carried by covered or open drains? Will the subproject lead to long-term or semi- permanent destruction of soils in cleared areas not suited for agriculture? Will the subproject lead to health hazards and interference of plant growth adjacent to roads by dust raised and blown by vehicles? Physical Cultural Resources Issues Yes No Comments Will the subproject have an impact on archaeological or historical sites, including historic urban areas? Will the subproject have an impact on religious monuments, structures and/or cemeteries? Have Chance Finds procedures been prepared for use in the subproject? Expropriation and Social Disturbance Issues Yes No Comments Will the subproject involve land expropriation or demolition of existing structures? Will the subproject lead to induced settlements by workers and others causing social and economic disruption? Will the subproject lead to environmental and social disturbance by construction camps? Other Social Impacts Issues Observations Number of project affected people (PAPs) How will PAPs be affected by the proposed 34 interventions and what is the magnitude of the impact? Will there be any new permanent or temporary job opportunities created for local residents? What are the potential impacts on human health? What are the potential impacts on vulnerable or marginalized groups? Planning Phase Will the project involve acquisition of a new plot(s) of land? If yes, explain arrangements for replacing assets with the same or better in terms of quantity and quality. If no, find alternate site or prepare a RAP or ARAP according to OP 4.12. Construction Phase 1. Will construction or operation of the Project use large amounts of local natural resources such as water, timber, gravel from river beds, stones or any resources which are non-renewable or in short supply? Yes No 2. Will the Project involve use, store, transport or hand substances harmful to human health or the environment? Yes No 3. Will the Project produce solid waste during construction or decommissioning? Yes No 4. Will construction require the use of heavy machinery or equipment? Yes No Operation Phase 5. Will the Project result in the production of solid waste during the operational phase? Yes No 6. Will the Project result in the production of hazardous waste during the operational phase? Yes No 7. Will the Project produce waste water that requires drainage? Yes No 35 8. Will the Project accumulate rain water that requires drainage? Yes No 9. Will the Project require more than basic community management of the services? Yes No Recommended Action Are all of the answers ‘NO’ Are any of the answers ‘YES’ If all the above answers are ’NO’, then there is no need for further action and the proposed action is to proceed with the proposed project intervention or subproject activity following ESSAF guidelines. If there is at least one ‘YES’ answer, are there appropriate mitigation measures that can be adopted so as to minimize the adverse impacts of the activity? If so, please describe the mitigation measures to be adopted as part of the implementation procedures of the proposed project intervention or subproject activity is to be financed: The completed form should be sent for review and approval to the Project Manager of the relevant PIU. If any of the aforementioned answers are “Yes�, then the Project Manager will take the final decision as to whether to clear the proposed project intervention or subproject activity for implementation, based on the safeguards specialists screening and set of recommended mitigation measures. Recommendation Signatures Signed by Safeguards Specialist Signed by Project Manager Note: One copy of the completed and signed form and accompanying documentation will be filed and kept in the PIU office. 36 Annex 5: Guidelines for Managing Physical Cultural Resources Physical cultural resources may not be known or visible; therefore, it is important that a project’s potential impacts on physical cultural resources be considered at the earliest possible stage of the project planning cycle. Physical Cultural Resources within Environmental Assessment The task team (TT) advises the borrower on the provisions of these guidelines and their application as an integral part of the Bank’s environmental assessment (EA) process. 3 The steps elaborated below follow the project cycle processes of screening, developing terms of reference (TORs) for the EA, preparing and reviewing the EA report, and project appraisal, supervision and evaluation. Environmental Screening As part of the environmental screening process, the TT determines whether the project (a) will involve significant excavations, demolition, movement of earth, flooding or other environmental changes; or (b) will be located in, or in the vicinity of, a physical cultural resources site recognized by competent authorities of the borrower; or (c) is designed to support management of physical cultural resources. If the project has any of the characteristics set out in (a) or (b), it is assigned to either Category A or B If the project has the characteristic set out in (c), it is normally assigned to either Category A or B. The procedures set out below are followed for all projects so categorized. The TT requests that the borrower inform the Bank of the relevant requirements of its legislation and of its procedures for identifying and mitigating potential impacts on physical cultural resources, including provisions for monitoring such impacts, and for managing chance finds. Terms of Reference for the EA The TT advises and assists the borrower, as necessary, in drafting the TORs for the physical cultural resources component of the EA. In preparing the TORs, the borrower identifies the likely major physical cultural resources issues, if any, to be taken into account in the EA. This identification of the possible presence of physical cultural resources is normally conducted on-site, in consultation with relevant experts and relevant project-affected groups. The TORs propose spatial and temporal boundaries for the on-site collection of baseline data on physical cultural resources potentially affected by the project, and specify the types of expertise required for the physical cultural resources component of the EA. Consultation Since many physical cultural resources are not documented, or protected by law, consultation is an important means of identifying such resources, documenting their presence and significance, assessing potential impacts, and exploring mitigation options. Therefore, the TT reviews the mechanisms established by the borrower for consultation on the physical cultural resources aspects of the EA, in order to ensure that the 3 The TT should also refer to the Physical Cultural Resources Guidebook. 37 consultations include meetings with project-affected groups, concerned government authorities and relevant non- governmental organizations. Baseline and Impact Assessment The TT ensures that the physical cultural resources component of the EA includes (a) an investigation and inventory of physical cultural resources likely to be affected by the project; (b) documentation of the significance of such physical cultural resources; and (c) assessment of the nature and extent of potential impacts on these resources. Mitigating Measures When the project may have adverse impacts on physical cultural resources, the EA includes appropriate measures for avoiding or mitigating these impacts. Capacity Assessment The EA assesses the borrower’s capacity for implementing the proposed mitigating measures and for managing chance finds, and where appropriate, recommends capacity building measures. Management Plan The EA involves the preparation of a physical cultural resources management plan that includes (a) measures to avoid or mitigate any adverse impacts on physical cultural resources; (b) provisions for managing chance finds; (c) any necessary measures for strengthening institutional capacity for the management of physical cultural resources; and (d) a monitoring system to track the progress of these activities. Review When reviewing the findings and recommendations of the EA, the TT discusses with the borrower the physical cultural resources components of the EA, including the physical cultural resources management plan, and determines whether these components provide an adequate basis for processing the project for Bank financing. Disclosure The TT consults with the borrower and persons with relevant expertise on whether disclosure of the findings of the physical cultural resources component of the EA would jeopardize the safety or integrity of any of the physical cultural resources involved. In addition, the TT consults the borrower to determine whether disclosure could endanger the source of information regarding the physical cultural resources. In such cases, sensitive information relating to these particular aspects, such as the precise location or value of a physical cultural resource, may be omitted from the EA report. Project Appraisal As appropriate, the appraisal team includes relevant physical cultural resources expertise. During appraisal, the TT ensures that the findings and recommendations of the physical cultural resources components of the EA, including the physical cultural resources management plan, are adequately reflected in project design, and are recorded in the Project Appraisal Document. The TT ensures that the estimated cost of implementing the physical cultural resources management plan is included in the project budget. Supervision and Evaluation For projects in which the physical cultural resources management plan incorporates provisions for safeguarding physical cultural resources, supervision missions include relevant expertise to review the implementation of such provisions. During project supervision, the TT monitors the implementation of the physical cultural resources management plan, including provisions for the treatment of chance finds. The TT also ensures that chance finds procedures are 38 included in procurement documents, as appropriate. The TT monitors the treatment of any chance finds and any other impacts on physical cultural resources that may occur during project implementation, and records relevant findings in the Implementation Status and Results Reports. Implementation Completion Reports assess the overall effectiveness of the project’s physical cultural resources mitigation, management, and capacity building activities, as appropriate. Capacity Building The TT reviews the need, if any, for enhancement of the borrower’s capacity to implement this policy, particularly in respect of information on physical cultural resources, on-site training, institutional strengthening, inter-institutional collaboration, and rapid-response capacity for handling chance finds. The TT then considers the need for such capacity enhancement, including project components to strengthen capacity. When the needs extend beyond the scope of the project, the TT draws the attention of the relevant Country Director to the possibility of including such capacity building within the overall country assistance program. 39 Annex 6: Guidelines for Land and Asset Acquisition Objectives 1. The overall objective of the ESSAF is to ensure that resettlement and land acquisition will be kept to a minimum, and will be carried out in accordance with these guidelines. Subproject proposals that would require demolishing structures or acquiring land should be carefully reviewed to minimize or avoid their impacts through alternative alignments. Proposals that require more than minor expansion along rights of way should be carefully reviewed. No land or asset acquisition may take place outside of these guidelines. A format for a Land Acquisition Assessment Data Sheet is attached. 2. These guidelines provide principles and instructions to compensate negatively affected persons to ensure that they will be assisted to improve, or at least to restore, their living standards, income earning or production capacity to pre-project levels regardless of their land tenure status. II. Categorization 3. Based on the number of persons that may be affected by the project, Project Affected People (PAPs) and the magnitude of impacts, projects may fall under one of the following: (a) Projects that will affect more than 200 project affected persons (PAPs), due to land acquisition and/or physical relocation, a full Resettlement Action Plan (RAP) must be produced. (b) Projects that will affect less than 200 persons do not require a full-scale RAP, but would need an Abbreviated Resettlement Action Plan (ARAP) and the following documentation: (i) a land acquisition assessment, (ii) the minutes or record of consultations which assess the compensation claimed and agreement reached, and (iii) a record of the receipt of the compensation, or voluntary donation, by those affected (see below). (c) Projects that are not expected to have any land acquisition or any other significant adverse social impacts; on the contrary, significant positive social impact and improved livelihoods are expected from such interventions – these do not require a RAP, ARAP or related document. III. Eligibility 4. PAPs are identified as persons whose livelihood is directly affected by the project due to acquisition of the land owned or used by them. PAPs deemed eligible for compensation are: (a) those who have formal legal rights to land, water resources or structures/buildings, including recognized customary and traditional rights; (b) those who do not have such formal legal rights but have a claim to usufruct rights or occupancy rights, some of which may be rooted in customary law; and (c) those whose claim to land and water resources or building/structures do not fall within (a) and (b) above, are eligible to resettlement assistance to restore their livelihood. IV. Acquisition of Productive Assets and Compensation 5. PAPs are eligible for replacement costs for lost assets as described below: (a) Voluntary contributions. Individuals may elect to voluntarily contribute land or assets provided the persons making such contributions do so willingly and are informed that they have the right to refuse such contributions; 40 and (b) Contributions against compensation. A contributor/asset loser considered "affected" will be eligible for compensation and other necessary assistance. 6. Voluntary contribution should be clearly documented to confirm the voluntary nature of the transition. The documentation should specify that the land is free of any squatters, encroachers or other claims. A format is shown in Attachment 3(i), which includes a Schedule for assessing any compensation claimed and the agreement reached. V. Compensation Principles 7. The project implementation agencies will ensure timely provision of the following means of compensation to affected peoples: (a) Project affected peoples losing access to a portion of their land or other productive assets with the remaining assets being economically viable are entitled to compensation at a replacement cost for that portion of land or assets lost to them. Compensation for the lost assets will be made according to the following principles: (i) replacement land with an equally productive plot, cash or other equivalent productive assets; (ii) materials and assistance to fully replace solid structures that will be demolished; (iii) replacement of damaged or lost crops and trees, at market value; (iv) other acceptable in-kind compensation; (v) in case of cash compensation, the delivery of compensation should be made in public, i.e., at the Community Meeting; and (vi) in case of physical relocation, provision of civic infrastructure at the resettlement sites. (b) PAPs losing access to a portion of their land or other economic assets rendering the remainder economically non-viable will have the options of compensation for the entire asset by provision of alternative land, cash or equivalent productive asset, according to the principles in (a) i-iv above. VI. Consultation Process 8. The implementing agencies will ensure that all occupants of land and owners of assets located in a proposed subproject area are consulted. Community meetings will be held in each affected district and village to inform the local population of their rights to compensation and options available in accordance with these Guidelines. The Minutes of the community meetings shall reflect the discussions held, agreements reached, and include details of the agreement, based on the format provided in Attachment 3(ii). 9. The implementing agency shall provide a copy of the Minutes to affected people and confirm in discussions with each of them, their requests and preferences for compensation, agreements reached, and any eventual complaint. Copies will be recorded in the posted project documentation and be available for inspection during supervision. Project and/or Sub-project Approval 10. In the event that a subproject involves acquisition against compensation, the implementing agency shall: (a) not approve the subproject unless satisfactory compensation has been agreed between the affected person and the local community; and 41 (b) not allow works to start until the compensation has been delivered in a satisfactory manner to the affected persons. Complaints and Grievances 11. Initially, all complaints should be negotiated to reach an agreement at the local community/village/district level. If this fails, complaints and grievances on these Guidelines, implementation of the agreements recorded in the Community Meeting Minutes or any alleged irregularity in carrying out the project can also be addressed by the affected peoples or their representative at the municipal or district level. If this also fails, the complaint may be submitted to the relevant implementing agency for consideration. Verification 12. The Community Meeting Minutes, including agreements of compensation and evidence of compensation made shall be provided to the Municipality/district, to the supervising engineers, who will maintain a record hereof, and to auditors and socio-economic monitors when they undertake reviews and post-project assessment. This process shall be specified in all relevant project documents, including details of the relevant authority for complaints at the municipal/district or implementing agency level. 42 Land Acquisition Assessment Data Sheet (To be used to record information on all land to be acquired) 1. Quantities of land/structures/other assets required: 2. Date to be acquired: 3. Locations: 4. Owners: 5. Current uses: 6. Users: • Number of Customary Claimants: • Number of Squatters: • Number of Encroachers: • Number of Owners: • Number of Tenants: • Others (specify): ______________________ Number: ___________________ 7. How land/structures/other assets will be acquired (identify one): • Donation • Purchase 8. Transfer of Title: • Ensure these lands/structures/other assets are free of claims or encumbrances. • Written proof must be obtained (notarized or witnessed statements) for the voluntary donation, or acceptance of the prices paid from those affected, together with proof of title being vested in the community, or guarantee of public access, by the title-holder. 9. Describe grievance mechanisms available: 43 Format to Document Contribution of Assets The following agreement has been made on............................ day of...................………. between...............................................resident of ............................................ (the Owner) and ……………………………………………….(the Recipient). 1. That the Owner holds the transferable right of ........................………………………donum of land/structure/asset in.........……………………………………………………………………………. 2. That the Owner testifies that the land/structure is free of squatters or encroachers and not subject to other claims. 3. That the Owner hereby grants to the Recipient this asset for the construction and development of................................for the benefit of the villagers and the public at large. (Either, in case of donation:) 4. That the Owner will not claim any compensation against the grant of this asset. (Or, in case of compensation:) 5. That the Owner will receive compensation against the grant of this asset as per the attached Schedule. 6. That the Recipient agrees to accept this grant of asset for the purposes mentioned. 7. That the Recipient shall construct and develop the……………………and take all possible precautions to avoid damage to adjacent land/structure/other assets. 8. That both the parties agree that the………………………so constructed/developed shall be public premises. 9. That the provisions of this agreement will come into force from the date of signing of this deed. ___________________________________ _____________________________________ Signature of the Owner Signature of the Recipient Witnesses: 1. _____________________________ 2. ______________________________ 44 Schedule of Compensation of Asset Requisition Summary of Units to be Compensated Agreed Compensation Affected Unit/Item a. Urban/agricultural land (m2): _____________________ ___________________ b. Houses/structures to be demolished (units/m2): _____________________ ___________________ c. Type of structure to be demolished (e.g. mud, brick, cement block, etc.,) _____________________ Not Applicable. d. Trees or crops affected: _____________________ ___________________ e. Water sources affected: _____________________ ___________________ Signatures of local community representatives, Head of Tribe: Include record of any complaints raised by affected persons: Map attached (showing affected areas and replacement areas): 45 Annex 7: Guidelines for Incorporating Indigenous Peoples in the Project In South Sudan, based on initial technical work inside and outside the Bank, it appears that the overwhelming majority of direct beneficiaries in Bank-financed projects are likely to be Indigenous Peoples. This term is used in a generic sense to refer to a distinct, vulnerable, social and cultural group possessing the following characteristics in varying degrees: (a) self-identification as members of a distinct indigenous cultural group and recognition of this identity by others; (b) collective attachment to geographically distinct habitats or ancestral territories in the project area and to the natural resources in these habitats and territories; (c) customary cultural, economic, social, or political institutions that are separate from those of the dominant society and culture; and (d) an indigenous language, often different from the official language of the country or region. When Indigenous Peoples are the sole or overwhelming majority of direct project beneficiaries, the elements of an Indigenous Peoples Plan (IPP) should be included in the overall project design, and a separate IPP is not required. The paragraphs below provide guidance on how as part of the EA process specific attention will be paid to identifying and addressing impacts on and inclusion of Indigenous Peoples in Bank-financed projects. The EA should include baseline information on the demographic, social, cultural, and political characteristics of the project-affected indigenous communities, the land and territories that they have traditionally owned or customarily used or occupied, and the natural resources on which they depend. It should also elaborate, where necessary, a culturally appropriate process for consulting with the communities at each stage of project preparation and implementation. The EA, based on free, prior, and informed consultation with the affected communities, should describe potential adverse and positive effects of the project. Critical to the determination of potential adverse impacts is an analysis of the relative vulnerability of, and risks to, the affected communities. The EA should include identification and evaluation, based on free, prior, and informed consultation with the affected communities, of measures necessary to avoid adverse effects, or if such measures are not feasible, the identification of measures to minimize, mitigate, or compensate for such effects, and to ensure that the affected communities receive culturally appropriate benefits under the project. Following the EA process, the project should, as required: (a) Ensure that free, prior, and informed consultation with the affected communities was carried out during project preparation and that there is broad community support for the project; (b) Include a framework for ensuring free, prior, and informed consultation with the affected communities throughout the project’s life-cycle; (c) Include an action plan of measures to ensure that the affected communities receive social and economic benefits that are culturally appropriate, including, if necessary, measures to enhance the capacity of the project 46 implementing agencies; (d) When potential adverse effects on the communities are identified, an appropriate action plan of measures to avoid, minimize, mitigate, or compensate for these adverse effects; (e) Accessible procedures appropriate to the project to address grievances by the affected communities arising from project implementation. When designing the grievance procedures, the borrower takes into account the availability of judicial recourse and customary dispute settlement mechanisms among the communities; and, (f) Mechanisms and benchmarks appropriate to the project for monitoring, evaluating, and reporting on the implementation of these issues in the PAD. The monitoring and evaluation mechanisms should include arrangements for the free, prior, and informed consultation with the affected communities. In those cases where Indigenous Peoples are not the overwhelming majority of direct project beneficiaries, then a social assessment should be prepared by the Borrower; there should a process of free, prior, and informed consultation with the affected Indigenous Peoples’ communities at each stage of the project, and particularly during project preparation, to fully identify their broad community support for the project; and, an IPP or Indigenous Peoples Planning Framework should be prepared and disclosed. 47 Annex 8: Guidelines for Preparing Environmental Management Plans and Pest Management Plans A project's Environmental Management Plan (EMP) consists of the set of mitigation, monitoring, and institutional measures to be taken during implementation and operation to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels. The plan also includes the actions needed to implement these measures. Management plans are essential elements of EA reports for Category A projects; for many Category B projects, the EA may result in a management plan only. To prepare a management plan, the borrower and its EA design team (a) identify the set of responses to potentially adverse impacts; (b) determine requirements for ensuring that those responses are made effectively and in a timely manner; and (c) describe the means for meeting those requirements. More specifically, the EMP includes the following components. Mitigation The EMP identifies feasible and cost-effective measures that may reduce potentially significant adverse environmental impacts to acceptable levels. The plan includes compensatory measures if mitigation measures are not feasible, cost-effective, or sufficient. Specifically, the EMP: (a) identifies and summarizes all anticipated significant adverse environmental impacts (including those involving indigenous people or involuntary resettlement); (b) describes--with technical details--each mitigation measure, including the type of impact to which it relates and the conditions under which it is required (e.g., continuously or in the event of contingencies), together with designs, equipment descriptions, and operating procedures, as appropriate; (c) estimates any potential environmental impacts of these measures; and (d) provides linkage with any other mitigation plans (e.g., for involuntary resettlement, Indigenous Peoples, or cultural property) required for the project. Monitoring Environmental monitoring during project implementation provides information about key environmental aspects of the project, particularly the environmental impacts of the project and the effectiveness of mitigation measures. Such information enables the borrower and the Bank to evaluate the success of mitigation as part of project supervision, and allows corrective action to be taken when needed. Therefore, the EMP identifies monitoring objectives and specifies the type of monitoring, with linkages to the impacts assessed in the EA report and the mitigation measures described in the EMP. Specifically, the monitoring section of the EMP provides(a) a specific description, and technical details, of monitoring measures, including the parameters to be measured, methods to be used, sampling locations, frequency of measurements, detection limits (where appropriate), and definition of thresholds that will signal the need for corrective actions; and (b) monitoring and reporting procedures to (i) ensure early detection of conditions that necessitate particular mitigation measures, and (ii) furnish information on the progress and results of mitigation. Capacity Development and Training To support timely and effective implementation of environmental project components and mitigation measures, the EMP draws on the EA's assessment of the existence, role, and capability of environmental units on site or at the agency and ministry level. If necessary, the EMP recommends the establishment or expansion of such units, 48 and the training of staff, to allow implementation of EA recommendations. Specifically, the EMP provides a specific description of institutional arrangements--who is responsible for carrying out the mitigatory and monitoring measures (e.g., for operation, supervision, enforcement, monitoring of implementation, remedial action, financing, reporting, and staff training). To strengthen environmental management capability in the agencies responsible for implementation, most EMPs cover one or more of the following additional topics: (a) technical assistance programs, (b) procurement of equipment and supplies, and (c) organizational changes. Implementation Schedule and Cost Estimates For all three aspects (mitigation, monitoring, and capacity development), the EMP provides (a) an implementation schedule for measures that must be carried out as part of the project, showing phasing and coordination with overall project implementation plans; and (b) the capital and recurrent cost estimates and sources of funds for implementing the EMP. These figures are also integrated into the total project cost tables. Integration of EMP with Project The borrower's decision to proceed with a project, and the Bank's decision to support it, are predicated in part on the expectation that the EMP will be executed effectively. Consequently, the Bank expects the plan to be specific in its description of the individual mitigation and monitoring measures and its assignment of institutional responsibilities, and it must be integrated into the project's overall planning, design, budget, and implementation. Such integration is achieved by establishing the EMP within the project so that the plan will receive funding and supervision along with the other components. Pest Management Plan A pest management plan is a comprehensive plan, developed when there are significant pest management issues such as (a) new land-use development or changed cultivation practices in an area, (b) significant expansion into new areas, (c) diversification into new crops in agriculture, (d) intensification of existing low-technology systems, (e) proposed procurement of relatively hazardous pest control products or methods, or (f) specific environmental or health concerns (e.g., proximity of protected areas or important aquatic resources; worker safety). A pest management plan is also developed when proposed financing of pest control products represents a large component of the project. The pest management plan is designed to minimize potential adverse impacts on human health and the environment and to advance ecologically based IPM. The plan is based on on-site evaluations of local conditions conducted by appropriate technical specialists with experience in participatory IPM. The first phase of the plan-- an initial reconnaissance to identify the main pest problems and their contexts (ecological, agricultural, public health, economic, and institutional) and to define broad parameters--is carried out as part of project preparation and is evaluated at appraisal. The second phase--development of specific operational plans to address the pest problems identified--is often carried out as a component of the project itself. As appropriate, the pest management plan specifies procedures for screening pest control products. In exceptional cases, the pest management plan may consist of pest control product screening only. Screening of Pest Control Products Pest control product screening is required when a project finances pest control products. The screening establishes an authorized list of pest control products approved for financing, along with a mechanism to ensure that only the specified products will be procured with Bank funds. Screening without a pest management plan is appropriate only when all of the following conditions are met: (a) expected quantities of pest control products are not significant from a health or environment standpoint; (b) no significant environmental or health concerns related to pest control need to be addressed; (c) the project will not introduce pesticide use or other nonindigenous 49 biological control into an area, or significantly increase the level of pesticide use; and (d) no hazardous products will be financed. 50 Annex 9: Guidelines for Preparing Abbreviated Resettlement Plans, Resettlement Action Plans and Process Frameworks This annex describes the elements of a Resettlement Action Plan, Abbreviated Resettlement Action Plan, and Process Framework. Resettlement Action Plan The scope and level of detail of the resettlement plan vary with the magnitude and complexity of resettlement. The plan is based on up-to-date and reliable information about (a) the proposed resettlement and its impacts on the displaced persons and other adversely affected groups, and (b) the legal issues involved in resettlement. The resettlement plan covers the elements below, as relevant. When any element is not relevant to project circumstances, it should be noted in the resettlement plan. Description of the project. General description of the project and identification of the project area. Potential impacts. Identification of (a) the project component or activities that give rise to resettlement; (b) the zone of impact of such component or activities; (c) the alternatives considered to avoid or minimize resettlement; and (d) the mechanisms established to minimize resettlement, to the extent possible, during project implementation. Objectives. The main objectives of the resettlement program. Socioeconomic studies. The findings of socioeconomic studies to be conducted in the early stages of project preparation and with the involvement of potentially displaced people, including (a) the results of a census survey covering (i) current occupants of the affected area to establish a basis for the design of the resettlement program and to exclude subsequent inflows of people from eligibility for compensation and resettlement assistance; (ii) standard characteristics of displaced households, including a description of production systems, labor, and household organization; and baseline information on livelihoods (including, as relevant, production levels and income derived from both formal and informal economic activities) and standards of living (including health status) of the displaced population; (iii) the magnitude of the expected loss--total or partial--of assets, and the extent of displacement, physical or economic; (iv) information on vulnerable groups or persons for whom special provisions may have to be made; and 51 (v) provisions to update information on the displaced people's livelihoods and standards of living at regular intervals so that the latest information is available at the time of their displacement. (b) Other studies describing the following (i) land tenure and transfer systems, including an inventory of common property natural resources from which people derive their livelihoods and sustenance, non-title-based usufruct systems (including fishing, grazing, or use of forest areas) governed by local recognized land allocation mechanisms, and any issues raised by different tenure systems in the project area; (ii) the patterns of social interaction in the affected communities, including social networks and social support systems, and how they will be affected by the project; (iii) public infrastructure and social services that will be affected; and (iv) social and cultural characteristics of displaced communities, including a description of formal and informal institutions (e.g., community organizations, ritual groups, nongovernmental organizations (NGOs)) that may be relevant to the consultation strategy and to designing and implementing the resettlement activities. Legal framework. The findings of an analysis of the legal framework, covering (a) the scope of the power of eminent domain and the nature of compensation associated with it, in terms of both the valuation methodology and the timing of payment; (b) the applicable legal and administrative procedures, including a description of the remedies available to displaced persons in the judicial process and the normal timeframe for such procedures, and any available alternative dispute resolution mechanisms that may be relevant to resettlement under the project; (c) relevant law (including customary and traditional law) governing land tenure, valuation of assets and losses, compensation, and natural resource usage rights; customary personal law related to displacement; and environmental laws and social welfare legislation; (d) laws and regulations relating to the agencies responsible for implementing resettlement activities; (e) gaps, if any, between local laws covering eminent domain and resettlement and the Bank's resettlement policy, and the mechanisms to bridge such gaps; and (f) any legal steps necessary to ensure the effective implementation of resettlement activities under the project, including, as appropriate, a process for recognizing claims to legal rights to land--including claims that derive from customary law and traditional usage. Institutional Framework. The findings of an analysis of the institutional framework covering (a) the identification of agencies responsible for resettlement activities and NGOs that may have a role in project implementation; (b) an assessment of the institutional capacity of such agencies and NGOs; and 52 (c) any steps that are proposed to enhance the institutional capacity of agencies and NGOs responsible for resettlement implementation. Eligibility. Definition of displaced persons and criteria for determining their eligibility for compensation and other resettlement assistance, including relevant cut-off dates. Valuation of and compensation for losses. The methodology to be used in valuing losses to determine their replacement cost; and a description of the proposed types and levels of compensation under local law and such supplementary measures as are necessary to achieve replacement cost for lost assets. 1 Resettlement measures. A description of the packages of compensation and other resettlement measures that will assist each category of eligible displaced persons. In addition to being technically and economically feasible, the resettlement packages should be compatible with the cultural preferences of the displaced persons, and prepared in consultation with them. Site selection, site preparation, and relocation. Alternative relocation sites considered and explanation of those selected, covering (a) institutional and technical arrangements for identifying and preparing relocation sites, whether rural or urban, for which a combination of productive potential, locational advantages, and other factors is at least comparable to the advantages of the old sites, with an estimate of the time needed to acquire and transfer land and ancillary resources; (b) any measures necessary to prevent land speculation or influx of ineligible persons at the selected sites; (c) procedures for physical relocation under the project, including timetables for site preparation and transfer; and (d) legal arrangements for regularizing tenure and transferring titles to resettlers. Housing, infrastructure, and social services. Plans to provide (or to finance resettlers' provision of) housing, infrastructure (e.g., water supply, feeder roads), and social services (e.g., schools, health services); plans to ensure comparable services to host populations; any necessary site development, engineering, and architectural designs for these facilities. Environmental protection and management. A description of the boundaries of the relocation area; and an assessment of the environmental impacts of the proposed resettlement 3and measures to mitigate and manage these impacts (coordinated as appropriate with the environmental assessment of the main investment requiring the resettlement). Community participation. Involvement of resettlers and host communities, (a) a description of the strategy for consultation with and participation of resettlers and hosts in the design and implementation of the resettlement activities; 53 (b) a summary of the views expressed and how these views were taken into account in preparing the resettlement plan; (c) a review of the resettlement alternatives presented and the choices made by displaced persons regarding options available to them, including choices related to forms of compensation and resettlement assistance, to relocating as individuals families or as parts of preexisting communities or kinship groups, to sustaining existing patterns of group organization, and to retaining access to cultural property (e.g. places of worship, pilgrimage centers, cemeteries); 5and (d) institutionalized arrangements by which displaced people can communicate their concerns to project authorities throughout planning and implementation, and measures to ensure that such vulnerable groups as indigenous people, ethnic minorities, the landless, and women are adequately represented. Integration with host populations. Measures to mitigate the impact of resettlement on any host communities, including (a) consultations with host communities and local governments; (b) arrangements for prompt tendering of any payment due the hosts for land or other assets provided to resettlers; (c) arrangements for addressing any conflict that may arise between resettlers and host communities; and (d) any measures necessary to augment services (e.g., education, water, health, and production services) in host communities to make them at least comparable to services available to resettlers. Grievance procedures. Affordable and accessible procedures for third-party settlement of disputes arising from resettlement; such grievance mechanisms should take into account the availability of judicial recourse and community and traditional dispute settlement mechanisms. Organizational responsibilities. The organizational framework for implementing resettlement, including identification of agencies responsible for delivery of resettlement measures and provision of services; arrangements to ensure appropriate coordination between agencies and jurisdictions involved in implementation; and any measures (including technical assistance) needed to strengthen the implementing agencies' capacity to design and carry out resettlement activities; provisions for the transfer to local authorities or resettlers themselves of responsibility for managing facilities and services provided under the project and for transferring other such responsibilities from the resettlement implementing agencies, when appropriate. Implementation schedule. An implementation schedule covering all resettlement activities from preparation through implementation, including target dates for the achievement of expected benefits to resettlers and hosts and terminating the various forms of assistance. The schedule should indicate how the resettlement activities are linked to the implementation of the overall project. Costs and budget. Tables showing itemized cost estimates for all resettlement activities, including allowances for inflation, population growth, and other contingencies; timetables for expenditures; sources of funds; and 54 arrangements for timely flow of funds, and funding for resettlement, if any, in areas outside the jurisdiction of the implementing agencies. Monitoring and evaluation. Arrangements for monitoring of resettlement activities by the implementing agency, supplemented by independent monitors as considered appropriate by the Bank, to ensure complete and objective information; performance monitoring indicators to measure inputs, outputs, and outcomes for resettlement activities; involvement of the displaced persons in the monitoring process; evaluation of the impact of resettlement for a reasonable period after all resettlement and related development activities have been completed; using the results of resettlement monitoring to guide subsequent implementation. Abbreviated Resettlement Action Plan An abbreviated plan covers the following minimum elements: (a) a census survey of displaced persons and valuation of assets; (b) description of compensation and other resettlement assistance to be provided; (c) consultations with displaced people about acceptable alternatives; (d) institutional responsibility for implementation and procedures for grievance redress; (e) arrangements for monitoring and implementation; and (f) a timetable and budget Process Framework A process framework is prepared when Bank-supported projects may cause restrictions in access to natural resources in legally designated parks and protected areas. The purpose of the process framework is to establish a process by which members of potentially affected communities participate in design of project components, determination of measures necessary to achieve resettlement policy objectives, and implementation and monitoring of relevant project activities. Specifically, the process framework describes participatory processes by which the following activities will be accomplished (a) Project components will be prepared and implemented. The document should briefly describe the project and components or activities that may involve new or more stringent restrictions on natural resource use. It should also describe the process by which potentially displaced persons participate in project design. (b) Criteria for eligibility of affected persons will be determined. The document should establish that potentially affected communities will be involved in identifying any adverse impacts, assessing of the significance of impacts, and establishing of the criteria for eligibility for any mitigating or compensating measures necessary. (c) Measures to assist affected persons in their efforts to improve their livelihoods or restore them, in real terms, to pre-displacement levels, while maintaining the sustainability of the park or protected area will be identified. The document should describe methods and procedures by which communities will identify and choose potential 55 mitigating or compensating measures to be provided to those adversely affected, and procedures by which adversely affected community members will decide among the options available to them. (d) Potential conflicts or grievances within or between affected communities will be resolved. The document should describe the process for resolving disputes relating to resource use restrictions that may arise between or among affected communities, and grievances that may arise from members of communities who are dissatisfied with the eligibility criteria, community planning measures, or actual implementation. Additionally, the process framework should describe arrangements relating to the following (e) Administrative and legal procedures. The document should review agreements reached regarding the process approach with relevant administrative jurisdictions and line ministries (including clear delineation for administrative and financial responsibilities under the project). (f) Monitoring arrangements. The document should review arrangements for participatory monitoring of project activities as they relate to (beneficial and adverse) impacts on persons within the project impact area, and for monitoring the effectiveness of measures taken to improve (or at minimum restore) incomes and living standards. 56