RP202 VOL. 16 -Datansha AC -18.1.11AC -18.1.2.4AC -18.1.2.7.1.1 AC 1 -18.1.2.7.1.2AC -18.1.2.7.1 AC -18.1.2.8AC -18.1 AC -18.3.2.10.1.1 AC-1 -18.3.2.10.1.1 AC-2 -18.3.2.10.2.1 AC -18.3.2.13AC -18.3.2.7.2.1 AC -18.3.2.9.1 AC -Datansha BD -18.1.11.1BD -18.1.1 BD -18.1.2.4.1 BD -18.1.2.7.1.1.1 BD -18.1.2.7.1.1 BD -18.1.2.7.1.2.1 BD -18.1.2.8.1 BD -18.3.2.10.1.1 BD-1 -18.3.2.10.1.1 BD-2 -18.3.2.10.2.1 BD -18.3.2.13.1 BD -18.3.2.7.2.1 BD Cost estimate of cost for house demolition shared by this project for [7 [7 [7 [7 [7 [7~~~~~~~~r- [7 [ [77 [7 L-7 L-7 F7 F Frame structure | Composite structure | Brick and timber structure Quantity Demolised area Unit price Total Quantity Demolised area Unit price Total Quantity Demolised area Unit price Total GradeI [l 7 7 n n [n [3 [ [ [ [7 [7 Grade 2 [7 [ [L [ [7 [1 [L [7 [7 n7 El [7 Grade 3 35.00 4,752.81 63.00 299,4268S 34.00 1,316.66 54.00 71,099.56 7.00 205.91 41.00 8,442.43 [7Datansha Grade 4 [7 [7 [l [l [7 [7 [[ [7 [7 [ [7 [7 GradeS [ [7 [ [ [7 7 7 [ [ [L L[ [7 Grade 6 2.00 17.68 53.00 937.12 4.00 8.08 45.00 363.52 [7 [7 . [ [| Subtotal 37.00 4,770.49 62.96 300,364Ol 38.00 1,324.74 53.95 71,463.09 7.00 205.91 41.00 8,44243 page I of 2 Datansha project (pipe network)e E V V V El Attachedtable:18.1.1 ACE Simple structure Total Quantity Demolised area Unit price Total Quantity Demolised area Unit price Total V V V 1V V V V V V V V V V V V 16.00 575.20 32.00 18,406.44 92.00 6,850.58 58.01 397,375.32 V V V1 V1 VV Vl V V V V V V V V V V 6.00 25.76 50.49 1,300.65 16.00 575.20 32.00 18,406.44 98.00 6,876.34 57.98 398,675.97 page 2 of 2 Cost estimate of compenstion for historically used house shared by this project Frame structure Composite structure Brick and timber structure Quanti Floor area Unit price Total price Quantity Floor area Unit price Total price Quantity Floor area Unit price Total price Grade I [b [ [ | [ b Grade 2 [n [ b2 [ [c [2 [2 [ Grade 3 1.00 13.06 700.00 9,145.50 1.00 114.34 650.00 74,317.75 1.00 99.54 550.00 54,747.00 historically Grade 4 [2 [i [2 [[ [ [2 2 2 b [ [ used houseGrade [ [ [ [ [ [ [ [ [ [ [ [ Grade 6 [b I [ 2 1.00 0.33 500.00 164.35 [2[1 2 [ [ Subtotal 1.00 13.06 700.00 9,145.50 2.00 114.66 649.57 74,482.10 1.00 99.54 550.00 54,747.00 page I of 2 ; for Datansha project (pipe network) Attached table: 18.1.2.4AC Simple structure | Total Quanti Floor area Unit price Total price Quantit Floor area Unit price Total price LI 31 3 |1 3, b1 1 31 2.00 175.04 350.00 61,262.71 5.00 401.98 496.23 199,472.96 3U LU LU LU LU l LU LU 0U LU LU LU 1.00 0.33 500.00 164.35 2.00 175.04 350.00 61,262.71 6.00 402.311 496.23 199,637.30 page 2 of 2 Cos estimate of compenstion for temporary relocation shared by this project for Datansha project (pipe network) F z C ________ _ C i- El Attached table: 18.1.2.7.1.1. lAC project purpose area tpye Quantity Floor area Unit price Monthly Relocation Total compensation period (month) Grade 1 Partially demolished 6.00 Grade 2 Partially demolished - - - 6.00( lHousing Grade 3 Partially demolished 23.00 2,476.88 16.00 39,630.15 6.00 237,780.90 H n Grade 4 Partially demolished l 6.00 Grade 5 Partially demolished 6.00 Grade 6 Partially demolished - - - - 6.00 - Subtotal 23.00 2,476.88 16.00 39,630.15 6.00 237,780.90 Grade I Partially demolished - - - - 6.00 - Grade 2 Partially demolished - - - - 6.00 - l Shop Grade 3 Partially demolished 11.00 689.24 65.00 44,800.42 6.00 268,802.50 Sp Grade 4 Partially demolished 6.00 Grade 5 Partially demolished 6.00 Grade 6 Partially demolished - - - - 6.00 - Subtotal 11.00 689.24 65.00 44,800.42 6.00 268,802.50 Grade 1 Partially demolished - - - - 6.00 - Grade 2 Partially demolished - - - - 6.00 - lOffice Grade 3 Partially demolished 1.00 53.43 48.00 2,564.70 6.00 15,388.17 Grade 4 Partially demolished - - - - 6.00 - House Grade 5 Partially demolished 6.00 withl Propert Grade 6 Partially demolished - - - - 6.00 - y right Subtotal 1.00 53.43 48.00 2,564.70 6.00 15,388.17 and on Grade 1 Partially demolished - - - - 6.00 - residen Grade 2 Partially demolished - - - - 6.00 tial plot Factory Grade 3 Partially demolished 3.00 263.60 30.00 7,907.96 6.00 47,447.73 building Grade 4 Partially demolished - - - - 6.00 - Grade 5 Partially demolished . 6.00 Grade 6 Partially demolished - - - - 6.00 - Subtotal 3.00 263.60 30.00 7,907.96 6.00 47,447.73 Grade I Partially demolished - - - - 6.00 - Grade 2 Partially demolished - - - - 6.00 other Grade 3 Partially demolished - - - - 6.00 - use Grade 4 Partially demolished - - - - 6.00 - Grade 5 Partially demolished - - - - 6.00 - Grade 6 Partially demolished - - - - 6.00 - Subtotal - - - - 6.00 - Grade 1 Partially demolished - - - - 6.00 ( Grade 2 Partially demolished - - - - 6.0 - Total Grade 3 Partially demolished 38.00 3,483.15 32.13 94,903.22 6.00 569,419.31 T Grade 4 Partially demolished o ta 6.0 Grade 5 Partially demolished . - 6.00 Grade 6 Partially demolished .- 6.00 - Subtotal 38.00 3,483.151 32.13 94,903.22 6.00 569,419.31 Cos t estimate of compenstion for temporary relocation shared by this project for Datansha project (pipe network) :;_____ _____. G__EJ L G_ EI El Attached table:18.1.2.7.1.2.1AC p ro jec c t pur pos5 e are a type quanti t y Floorarea Unit Monthly Relocation Total price compensation period (month) Grade I temporary demolished - 6.00 Grade 2 temporary demolished - - 6.00 - Housing Grade 3 temporary demolished - 0.08 16.00 1.35 6.00 8.13 Grade 4 temporary demolished - - - - 6.00 - Grade 5 temporary demolished - - - - 6.00 - Grade 6 temporary demolished 4.00 19.95 8.00 159.58 6.00 957.49 Subtotal 4.00 20.03 9.60 160.94 6.00 965.62 Grade I temporary demolished - - - - 6.00 - Grade 2 temporary demolished - - - - 6.00 - Shop Grade 3 temporary demolished - 24.52 65.00 1,593.62 6.00 9,561.72 Shop Grade 4 temporary demolished 6.00 l Grade 5 temporary demolished - - - - 6.00 - Grade 6 temporary demolished 1.00 3.87 10.00 38.75 6.00 232.49 Subtotal 1.00 28.39 51.25 1,632.37 6.00 9,794.21 Grade I temporary demolished - - - - 6.00 Grade 2 Area of land borrowed - - - - 6.00 - Grade 3 Area of land borrowed - - - - 6.00 - Office Grade 4 Area of land borrowed - - - - 6.00 - House Grade 5 Area of land borrowed - - - - 6.00 - With Propert Grade 6 Area of land borrowed 1.00 1.94 10.00 19.37 6.00 116.24 y right Subtotal 1.00 1.94 10.00 19.37 6.00 116.24 and on Grade I Area of land borrowed - - - - 6.00 - residen Grade 2 Area of land borrowed - - - - 6.00 - tial plot Factory Grade 3 Area of land borrowed - - - - 6.00 - building Grade 4 Area of land borrowed - - - - 6.00 - Grade 51 Area of land borrowed - - - - 6.00 - Grade 6 Area of land borrowed - - - - 6.00 - Subtotal - - - - 6.00 - Grade 1 Area of land borrowed - - - - 6.00 - Grade 2 Area of land borrowed - - - - 6.00 - other Grade 3 Area of land borrowed - - - - 6.00 - use Grade 4 Area of land borrowed - - - - 6.00 - Grade 5 Area of land borrowed - - - - 6.00 - Grade 6 Area of land borrowed - - - - 6.00 - Subtotal - - - - 6.00 - Grade 1 Area of land borrowed - - - - 6.00 - Grade 2 Area of land borrowed - - - - 6.00 - Grade 3 Area of land borrowed - 24.60 52.75 1,594.97 6.00 9,569.85 Total , Grade 4 Area of land borrowed - - 6.00 - Grade 5 Area of land borrowed -- --6.00- Grade 6 Area of land borrowed 6.00 25.76 8.67 217.70 6.00 1,306.22 Total 6.00 50.36 26.30 1,812.68 6.00 10,876.07 Cost estimate of compenstion for temporary structure before expiration shared by ti bl El El El El El El WE EG El El El El Frame structure | Composite structure Brick and timber stru Floor Total Floor quantity Floor area Unit price Total price quantity ar|aUnit pnce |r | quantity area Unit price Grade 1 temporary demolished El El 250.00 El El LE 250.00 El El El 250.00 Grade 2 temporary demolished El El 250.00 El El El 250.00 El El El 250.00 Grade 3 temporary demolished El El 250.00 El El El 250.00 E El El 250.00 Commercial Grade4 temporary demolished El El 250.00 El El El 250.00 El El El 250.00 Grade 5 temporary demolished EL El 250.00 El EL El 250.00 El El El 250.00 Grade 6 temporary demolished El El 250.00 El El El 250.00 El | L El 250.00 Subtotal El El 250.00 El El El 250.00 El El El 250.00 Frame structure Co posite structure Brick and timber stru Floor . Total Floor quantity Floor area Unit price Total price quantity area Unit pnce pnce quantity area Unit price Grade I temporary demolished El El 250.00 El El El 250.00 E El El 250.00 Grade 2 temporary demolished El El 250.00 El El El 250.00 El El El 250.00 Grade 3 temporary demolished El El 250.00 El El El 250.00 El El El 250.00 Other Grade 4 temporary demolished El El 250.00 El El El 250.00 El El El 250.00 uses ____ Grade 5 temporary demolished E El 250.00 El E E 250.00 El E El 250.00 Grade 6 temporary demolished El E 250.00 El El E 250.00 El El El 250.00 Subtotal El El 250.00 El El El 250.00 LI El El 250.00 pgae 1 of 2 uis project for Datansha project (pipe network) r . r Li ViAttached table:18.1.2.7.1.IAC-l icture Simple structure Total Total quantity Floor Unit price Total price quantity Floor area Unit price Total price pnice area ri r| El 250.00 Oi O G 250.00 Oi O E l| 250.00 Oi Oi O 250.00 El Li E lO 250.00 El ni oi 250.00 Oi oi El El 250.00 Oi O L 250.00 Oi oi oi ni 250.00 Oi Oi El 250.00 Oi Li Li ~~~li 250.00 Li Li Li 250.00 Li oi oi ri 250.00 Li oi El 250.00 n Attached table: 18.1.2.7.1.AC icture Simple structure Total Total quantity Floor Unit price Total price quantit Floor area Unit pnce Total pnce price quniy area Li Li Li 250.00 Li n Li 250.00 Li Li Li L 250.00 El Li El 250.00 Li ri Li Li 250.00 Li Li Li 250.00 El Li El Li 250.00 Li Li El 250.00 Li Li Li Li 250.00 0 Li El 250.00 Li Li Li Li 250.00 Li Li Li 250.00 Li Li_l El 250.00 Li Li L 250.00 El pgae 2 of 2 Cost estimate of cost for rehabilitation of partially affected house with Property right (pipe network) ______ Frame structure Composite structure Brick and timber structure Quantity Floor area Unit price Total price Quantity Floor area Unit Total price Quantity Floor area Unit Total price Quantity repaired repaired price repaired price Grade I 0 O 100.00 nI o o 120.00 O O O 150.00 O n house Grade 2 O 7 100.00 n O O 120.00 O O 7 150.00 O O with Grade 3 n 7 100.00 7 7 24.08 120.00 2,889.56 7 7 150.00 n 7 Propert Grade 4 O 7 100.00 O O 7 120.00 7 7 7 150.00 7 O y right Grade 5 7 O 100.00 7 7 o 120.00 7 7 7 150.00 7 7 Grade 6 O 7 100.00 7 3.00 7.75 120.00 929.95 7 7 150.00 O 7 Subtotal 7 7 100.00 7 3.00 31.83 120.00 3,819.51 7 7 150.00 E 7 page 1 of 2 shared by this project for Datansha project b n c Attached table:18.1.2.8.ACb Simple structure Total Floor area |ni Total price Quantity Floor area Unit price Total price repaired price Toa rc uniy repaired n 60.00 |i ni bi ni El b 60.00 | E El El n n ni 60.00 |i n 24.08 ni 2,889.56 El 60.00 El n ni n b n 60.00 b ni ni ni El n 60.00 n 3.00 7.75 El 929.95 b 60.00 bi 3.00 31.83 ni 3,819.51 page 2 of 2 uost estimate oI compensiion ior permanentiy aiiectea nouse wltn rroperty rignt,nouse on 3] n] c] 3] n] 3] C] 3]] C n Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Wholly demolish F El F] Partially demolis El El F] L] Grade 1 )rarily demol F] El Wholly demolish F F El Partially demolis El C] 3] 3] El Grade 2 )rarily demol Li F El 3 3 Wholly demolish , El n 1.00 0.81 Partially demolis 3.00 479.52 2,880.00 1,381,016.36 3.00 362.45 Grade 3 )rarily demol FC El F] F] F House with Wholly demolish El El F] F] Property Housing Partially demolis FF F] El 3 right Grade 4 )rarily demol El El Wholly demolish , Partially demolis ] ] ] 3 3 F Grade 5 )rarily demol F] F] ] F F Wholly demolish ] i C 3 n n Partially demolis El 3 C 3 F n Grade 6 )rarily demol CF F] El 1.00 1.94 Wholly demolish CF F] FC 1.00 0.81 Partially demolis 3.00 479.52 2,880.00 1,381,016.36 3.00 362.45 subtotal )rarily demol F F] F] 1.00 1.94 Wholly demolish FF F F] F] El Partially demolis Li El El El F] Grade 1 )rarily demol El ] ] 3 Wholly demolish n F] l 3 3 Partially demolis F] El El Grade 2 )rarily demol El F] ] Wholly demolish F 3 l . 1.00 11.14 page 1 of 84 -OSr.>-suimate oI compenstlon ior permanentiy ariectea nouse wltn rroperty rigni,nouse on Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Partially demolis 2.00 532.32 3,924.43 2,089,044.97 2.00 33.50 Grade 3 )rarily demol CLi C E l 24.08 House with Wholly demolish El Li El El Li Property Shop Partially demolis LL LI Li Li Li right Grade 4 )rarily demol LG El El Li Wholly demolish El El Li LI Li Partially demolis El El El o Li El Grade 5 )rarily demol Ci Li Li i G L Wholly demolish . C E li Partially demolis El Li E li Grade 6 )rarily demol El Li 1.00 3.87 Wholly demolish El El El El 1.00 11.14 Partially demolis 2.00 532.32 3,924.43 2,089,044.97 2.00 33.50 subtotal )rarily demol G LI L 1.00 27.95 Wholly demolish C Li G Partially demolis El G G Grade 1 )rarily demol El G G Wholly demolish Li G Li El El Partially demolis Li El El Li Li L Grade 2 )rarily demol Ci El Li Li Li Li Wholly demolish Ci Li Li El 1.00 57.26 Partially demolis 1.00 53.43 3,570.00 190,749.23 El n Grade 3 rarily demol Li El El Li n El House with Wholly demolish l C C n El Li Property Office Partially demolis F] n E Li right Grade 4 )rarily demol F G n Wholly demolish C G n n n Partially demolis C n n G n page 2 of 84 iost estimate oi compenstion ior permanentiy aiiectea nouse wltn rroperty rigntnouse on nl n n c c c c p Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Grade 5 )rarily demol LI C LV Wholly demolish C C C C Partially demolis C El E l 0 Grade 6 )rarily demol C E l V 1.00 1.94 Wholly demolish C C C C 1.00 57.26 Partially demolis 1.00 53.43 3,570.00 190,749.23 C C subtotal )rarily demol C O C 1.00 1.94 Wholly demolish C El C El Partially demolis C C C El Grade 1 )rarily demol El El C C Wholly demolish E l C C C C Partially demolis El El El Grade 2 )rarily demol C C C C C C Wholly demolish V ElE E l Partially demolis C C E C C C Grade 3 )rarily demol C O n c House with Wholly demolish C El C C Property building Partially demolis C l C C right Grade 4 )rarily demol C C E l C Wholly demolish C VV Partially demolis El E El Grade 5 )rarily demol CV Wholly demolish C V V n V V Partially demolis C C C n V V Grade 6 )rarily demol C C C V V V Wholly demolish V n V V V V Partially demolis V V V V V V ________ subtotal prarily demol El VV page 3 of 84 Lost estimate OT compenstion ior permanentiy aiiectea nouse wltn rroperLy rignt,nouse on Li F] F] _ ~ ~~~~~~ ~~~~~ ________________________ Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Wholly demolish O C l O O O Partially demolis O] C F] F O n Grade 1 rarily demol O O O O O O Wholly demolish O C] F F] Partially demolis ] ] I ] F O Grade 2 )rarily demol F] Wholly demolish O] LI Partially demolis F F] F] F] Grade 3 )rarily demol F F F]] House with Wholly demolish F El F] F] F] Property Other uses Partially demolis El F] El F] right Grade 4 )rarily demol El F] F] Wholly demolish El El F] El Partially demolis F] F] F Grade 5 )rarily demol F] F] F Wholly demolish F] F] El Partially demolis F] El El F] F Grade 6 )rarily demol F] F F] F] El Wholly demolish E ] FO C Partially demolis El F] F] El subtotal -rarily demol ] ] ] ] O F Wholly demolish El El ] F L I Partially demolis F] F] F] F] El F] Grade 1 rarily demol F] F] o] o] o] El Wholly demolish F] El F] F] El F] Partially demolis F El n F] F] Grade 2 rarily demol F], F] F. LI El Wholly demolish , F n n 3.00 69.21 page 4 of 84 _ QS l_ t ieSI- mae OI compenstion Tor permanentiy aiiectea nouse wltn rroperty rignt,nouse on c7 n7 [c c7 [7 n7 Li c~ [7n Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Partially demolis 6.00 1,065.27 3,436.51 3,660,810.57 5.00 395.95 Grade 3 rarily demol [C [C [l [C [l 24.08 House with Wholly demolish [7 17 [ [7 [l Property total Partially demolis [7 El [7 [7 [ right Grade 4 rarily demol [[ Wholly demolish [[ Partially demolis [l [7 [[ Grade 5 )rarily demol [[ [[[ Wholly demolish [n [[ Partially demolis [[ [l [ Grade 6 )rarily demol [7 [7 [7 [7 3.00 7.75 Wholly demolish [ [ [7 [7 3.00 69.21 Partially demolis 6.00 1,065.27 3,436.51 3,660,810.57 5.00 395.95 subtotal )rarily demol [7 [7 [7 [7 3.00 31.83 Wholly demolish [7 [[ [7 [7 [7 Partially demolis [[ [7 [7 17 Grade 1 )rarily demol [7 [7 [[ Wholly demolish [7 7 [ Partially demolis [[ 7 [ Grade 2 )rarily demol [[ [[ [7 [I Wholly demolish 15.00 2,216.85 2,550.00 5,652,963.67 8.00 327.49 Partially demolis 8.00 1,350.95 2,550.00 3,444,928.98 6.00 200.07 Grade 3 )rarily demol [7 [7 [7 [7 [ 0.08 house on Wholly demolish [[ [7 [ [7 [7 residential Housing Partially demolis [[ [7 [7 plot Grade 4 )rarily demol [7 Wholly demolish [7 Partially demolis 7 [ page 5 of 84 __O_ T _siQmare or compenstlon ior permanentiy arrectea nouse wltn rroperty rignt.nouse on LibF n b b b Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Grade 5 )rarily demol H c r c b b Wholly demolish b O b r b b Partially demolis El F El F] Grade 6 )rarily demol 2.00 17.68 550.00 9,724.86 Wholly demolish, 15.00 2,216.85 2,550.00 5,652,963.67 8.00 327.49 Partially demolis 8.00 1,350.95 2,550.00 3,444,928.98 6.00 200.07 subtotal )rarily demol 2.00 17.68 550.00 9,724.86 F] 0.08 Wholly demolish F] F] F] F] El F] Partially demolis F] F F] F] F] F] Grade 1 )rarily demol FF F] LI LI Wholly demolish FF F] El F] Partially demolis F] Grade 2 )rarily demol El Wholly demolish 3.00 65.83 2,550.00 167,876.06 5.00 101.36 Partially demolis 2.00 40.84 2,550.00 104,138.65 4.00 57.27 Grade 3 )rarily demol F] .] El El F] 0.08 house on Wholly demolish El El _ _ _ F] residential Shop Partially demolis F] F El F] plot Grade 4 )rarily demol F] FF F] El El Wholly demolish C] LI El El El El Partially demolis C] CF b] El F] Grade 5 )rarily demol C] F] C F] Wholly demolish ] b F] b Partially demolis F] Grade 6 )rarily demol F] F] F Wholly demolish 3.00 65.83 2,550.00 167,876.06 5.00 101.36 Partially demolis 2.00 40.84 2,550.00 104,138.65 4.00 57.27 subtotal Irarily demol F] F] H 0.08 page 6 of 84 __LosS estimate oI compensTion ror permanentiy ariectea nouse wlin rroperty rignL,nouse-on1i -_ Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Wholly demolish O O7 [O [n [l Partially demolis I] [ [7 Grade 1 )rarily demol [ [[ [7 [ [ Wholly demolish 7 7 7 [ [ [ Partially demolis 7 7 [ 7 [ O Grade 2 )rarily demol 7 7 7 7 [ [ Wholly demolish [ [ [7 Partially demolis [7 [7 [7 El Grade 3 )rarily demol 7 7 7 7 [ o house on Wholly demolish 7 7 7 7 [ [ residential Office Partially demolis [7 [7 [7 [7 plot Grade 4 )rarily demol [7 [7 [7 [7 Wholly demolish [ [7 [7 [7 [7 [7 Partially demolis [7 [7 [ [7 [7 E7 Grade 5 )rarily demol [7 [7 [7 [7 [7 [7 Wholly demolish [7 [7 [7 [7 [7 [7 Partially demolis [ [7 [7 [7 [7 7 Grade 6 )rarily demol [7 [7 [7 [7 Wholly demolish [[ [ [7 Partially demolis [[ [[ [7 E7 subtotal )rarily demol [7 [7 [7 [7 Wholly demolish [7 [7 [7 [7 Partially demolis [7 [7 [[ [7 E7 Grade 1 rarily demol [7 [7 [7 [7 [7 [7 Wholly demolish [7 [7 [7 7 [ [ Partially demolis [7 [7 [7 7 [ o Grade 2 )rarily demol [7 [7 [7 7 [ [ Wholly demolish [ [ [7 [ [ [ page 7 of 84 iOsT esilmate oI compenstion ior permanentiy aIiectea nouse wltn rroperty rignt,nouse on Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Partially demolis O O O O [ H Grade 3 rarily demol O O O O O O house on Wholly demolish O E l O O H residential building Partially demolis O El o H plot Grade 4 )rarily demol O O O O O Wholly demolish O O O O O O Partially demolis E H E H [ O Grade 5 )rarily demol O O H O H O Wholly demolish O O O n E l Partially demolis E H E l H O Grade 6 )rarily demol O O O O O O Wholly demolish O O n o I o Partially demolis L H H H H subtotal rarily demol O O El OO Wholly demolish O O O O O O Partially demolis O O O O n o Grade 1 )rarily demol O O O O O O Wholly demolish O O O O _ O Partially demolis l E l Grade 2 )rarily demol O O O O O Wholly demolish O O n o E l Partially demolis E El H O H Grade 3 )rarily demol O H O O OO house on Wholly demolish n El o 2 o residential Other uses Partially demolis H H H H H H plot Grade 4 )rarily demol H H H H H H Wholly demolish [n o o E H H Partially demolis O H H H o o page 8 of 84 uosT esimatLe oi compensLion ior permanentiy airectea nouse witn rroperty rigni.nouse on _ b H n o bH E n Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Grade 5 rarily demol E l O C b C Wholly demolish E l O C n c Partially demolis O O b C El Grade 6 )rarily demol HH H HC Wholly demolish H H H H H H Partially demolis O H H H H H subtotal )rarily demol H H H H H H Wholly demolish C H H H H H Partially demolis H H H H H H Grade 1 )rarily demol H H H H H H Wholly demolish H H H H H H Partially demolis H H HH H Grade 2 )rarily demol H H H H H H Wholly demolish 18.00 2,282.68 2,550.00 5,820,839.74 13.00 428.86 Partially demolis 10.00 1,391.79 2,550.00 3,549,067.63 10.00 257.35 Grade 3 )rarily demol H H H H H 0.17 house on Wholly demolish H H H H H H residential total Partially demolis Hl H H H H plot Grade 4 )rarily demol HO HH Hl Wholly demolish H HH H Partially demolis H H HH H Grade 5 )rarily demol H 0 H H H H Wholly demolish H H H H H H Partially demolis H H H H H H Grade 6 rarily demol 2.00 17.68 550.00 9,724.86 Hb Wholly demolish 18.00 2,282.68 2,550.00 5,820,839.74 13.00 428.86 Partially demolis 10.00 1,391.79 2,550.00 3,549,067.63 10.00 257.35 subtotal rarily demol 2.00 17.68 550.00 9,724.86 H 0.17 page 9 of 84 .ost estimate oi compenstion ior permanentiy arrectea nouse wJ.tn rroperty rigntLnouse on n~~~~~~~~~~~~~~~~~~~~~I LE G1 1 nb Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Wholly demolish [b [7 [l [n El El Partially demolis [7 [7 [l [7 [7 F. Grade 1 rarily demol 7 [[ [7 [ [ Wholly demolish [7 [ 7 [ [ Partially demolis [7 [ [ [ b7 Grade 2 )rarily demol 7 [[ [7 [ [ Wholly demolish 1.00 13.06 700.00 9,145.50 [ [ Partially demolis [ 7 7 7 [ [ Grade 3 )rarily demol [7 [7 [7 [7 [ Wholly demolish [ [7 [7 [7 [7 [ historically Housing Partially demolis[ used house Grade 4 rarily demol 7 7 7 [ [ E Wholly demolish [7 [7 [7 [7 [7 [7 Partially demolis [7 [7 [7 [7 [7 7 Grade 5 )rarily demol [ [7 [[ [ b7 Wholly demolish 7 [7 [[ [ [ Partially demolis [ [] [[ [ b Grade 6 )rarily demol [7 7 [ [ 1.00 0.33 Wholly demolish 1.00 13.06 700.00 9,145.50 [7 [7 Partially demolis [ [ [ [7 [7 17 subtotal )rarily demol [7 [7 [7 [7 1.00 0.33 Wholly demolish 7 [ 7 [ [ [ Partially demolis 7 7 7 7 [ n Grade 1 rarily demol [[ [7 [ [ [ Wholly demolish [[ [7 [ Partially demolis [7 [7 [7 [7 Grade 2 rarily demol [7 [7 7 [ 7 [ Wholly demolish [7 [7 7 [ 7 [ page 10 of 84 _ 'OSt est imaze OT compenstion Tor permanentiy artectea nouse witn rroperuy rigni,nouse on Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Partially demolis H H H H H O Grade 3 rarily demol H H O H H O Wholly demolish H H H H H O historically Shop Partially demolisH H ___El used house Grade 4 )rarily demol O O H O O O Wholly demolish El H O O El Partially demolis HOH HOH El Grade 5 )rarily demol H H H F] L Wholly demolish El O I El Partially demolis LI O O El E Grade 6 )rarily demol HO [ H H El Wholly demolish LI H H H OH Partially demolis HO H H O O subtotal )rarily demol El H O n o Wholly demolish H H [] O O L Partially demolis H O O 0 3 H Grade 1 )rarily demol H O O O O E Wholly demolish H H O O Partially demolis H H El HO Grade 2 )rarily demol H ° H H H Wholly demolish LI O H E l Partially demolis O O n o El Grade 3 )rarily demol O O O O L I Wholly demolish El E H H O historically Office Partially demolis_ _ _ _ _ _____ used house Grade 4 )rarily demol H HlH H H H Wholly demolish H HlH H H H Partially demolis H Hl H H H page 11 of 84 st esml1aTe OT compenstion ror permanentiy aiiectea nouse wlin rroperty rignllnouse on Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Grade 5 rarily demol n] Fr El nn Wholly demolish C] n] El nn Partially demolis F] F] El Grade 6 )rarily demol F] F El Wholly demolish t] F] F] Partially demolisF F] El subtotal )rarily demol F] Wholly demolish F] El Partially demolis F] El Grade 1 ,rarily demol F] F] F] Wholly demolish El El F] El El Partially demolis FF El Grade 2 )rarily demol FF F] Wholly demolish n F] F] El El Partially demolis F] F] El F] Grade 3 )rarily demol n n n n Wholly demolishF historically Foctory Partially demolis used house building Prilyeoi ]F ]F ]F Grade 4 )rarily demol F] F] FF Wholly demolish El F] Partially demolis F] F] n] Fn Grade 5 )rarily demol F] ] ] ] F Wholly demolish El F] F] El El Partially demolis F] F] El El F] Grade 6 )rarily demol F] F] Wholly demolish n] El Partially demolis ]F] l , n subtotal rarily demol i n F page 12 of 84 ____ S I estimate OI compenstion ior permanentiy aiiectea nouse wlJn rroperty rigni.nouse on n n r_ __n_ __n_ _ _ _ _ _ _ _ _ _ _ _ _ _,__ _ _ Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Wholly demolish L _ __C Ell C Partially demolisl El E 1 n _ Grade 1 )rarily demol :_ ___ __ _ Wholly demolish L L ________ Partially demolisl [________ Grade 2 )rarily demol L L E El L Wholly demolish I [I E LI 1.00 114.34 Partially demolisl [ LI I O n L Grade 3 )rarily demol IZ LI L L LI Wholly demolish LI [ LI El LI historically Other uses Partially demolisl [l_ _ used house Grade 4 )rarily demol L I CI L L Wholly demolish LI . [1 E L LI L Partially demolisl [I LI LI O El L Grade 5 )rarily demol L LI CI LI L LI Wholly demolish El 1 C L 0 Partially demolis LIL I] LI Grade 6 )rarily demol El LI L Wholly demolish LI 1.00 114.34 Partially demolis El subtotal )rarily demol n L o Wholly demolish L LI L Cl [n Partially demolis EL EL LI L Grade 1 )rarily demol L L L L L L Wholly demolish L Cl L L LI LI Partially demolis [ LI L L L L Grade 2 )rarily demol l LI El I Wholly demolish 1.00 13.06 700.00 9,145.50 1.00 114.34 page 13 of 84 uost estimate oi compenstion ior permanentiy atiectea nouse wltn rroperty rignt.nouse on | n7 [7 [n [7 n7 [ [ [7[ [ Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Partially demolis [ l [ [ [ [ Grade 3 rarily demol 7 7 [7 [7 [ [ Wholly demolish [ [ [ [ [ [7 historically total Partially demolis [7 [7 [7 [7 [[ used houseI Grade 4 )rarily demol [7 7[ [ [7 Wholly demolish [7 [7 [ [n Partially demolis [ [ [[ [ n7 Grade 5 )rarily demol [ [ [ [ [ [ Wholly demolish 7 7 7 7 [ [ Partially demolis [ [ [7 [ [7 7 Grade 6 )rarily demol [ 1.00 0.33 Wholly demolish 1.00 13.06 700.00 9,145.50 1.00 114.34 Partially demolis [7 [ [ [7 subtotal )rarily demol 7 7 [ 1.00 0.33 Wholly demolish [ [ [ [ [ Partially demolis [7 7 7 [ Grade 1 )rarily demol 7 7 7 7 [ Wholly demolish [7 Partially demolis [7 7 Grade 2 )rarily demol [7 [7 [7 Wholly demolish 7 7 [7 [7 [ [ Partially demolis [7 [7 [ n7 Grade 3 )rarily demol 7 7 7 7 [ [ Temporary Wholly demolish 7 7 7 7 structure Housing Partially demolis 7 7 [ before expiration Grade 4 )rarily demol [ [ [ El [ Wholly demolish [7 [7 [7 [7 Partially demolis 7 7 7 [ page 14 of 84 _ _ os Iestimate OI compenstion ior permanentiy aiiectea nouse witn rroperty rignt,nouse on Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Grade 5 )rarily demol H H H H H H Wholly demolish O H Ho H H Partially demolis H H El E H Grade 6 )rarily demol HC H H H H Wholly demolish HO H H H H Partially demolis n H H H H subtotal rarily demol H H H H H H Wholly demolishH Partially demolis H H H H H H Grade 1 )rarily demol HO H H H H Wholly demolish H H H H H H Partially demolis H H H H H H Grade 2 )rarily demol H H H H H H Wholly demolish H H H H H H Partially demolis H H H H H H Grade 3 )rarily demol Hl H H H H Temporary Wholly demolish HH HH structure Shop Partially demolis H H H H H before expiration Grade 4 rarily demol H H H H H H Wholly demolish H H H Hl H Partially demolis H H H H Grade 5 )rarily demol H H H H H H Wholly demolish Hl Hl H H Partially demolis H H H H H H Grade 6 )rarily demol H H H H H H Wholly demolish H H H H H H Partially demolis H H H H H H subtotal Irarily demoll H H H H H page 15 of 84 uost esLimaTe oT compenstion Tor permanentiy aTTectea nouse wltn rroperty rignt,nouse on c n c nH n c__,__c_c Frame structure | Composite quantity Floor area Unit price Total price quantity Floor area Wholly demolish El H1 H El Partially demolis H H H H Grade 1 )rarily demol H H H H H Wholly demolish H H El H Partially demolis C H H H H Grade 2 )rarily demol C C H C Wholly demolish H n E l Partially demolis H H H n Grade 3 )rarily demol H n c Temporary Wholly demolish C H H structure Office Partially demolis n c before expiration Grade 4 )rarily demol EH C Wholly demolish l C H H H Partially demolis HH H Grade 5 )rarily demol Wholly demolish H H H H H Partially demolis H Hl H H H Grade 6 rarily demol H E l H H n Wholly demolish H H n H H Partially demolis O H H H H H subtotal rarily demol H n H H H H WIlholly demolish HH Partially demolis H E EH Grade 1 )rarily demol Wholly demolish Hl Partially demolis HH Grade 2 )rarily demol HH Wholly demolish H c H H H page 16 of 84 toST estimate oT compenStion rot permanently arrecLea nouse wltn rroperty rign, nouse on I Frame structure | Composite quantity Floor area Unit price Total price quantity Floor area Partially demolis [7 [7 [o [7 [7 o Grade 3 )rarily demol [ [[ [7 [7 Temporary Wholly demolish [[ [[ [7 [7 structure Foctory Partially demolis El E7 7 [7 E7 before building expiration Grade 4 )rarily demol 7 l [ [ [ [ Wholly demolish [[ [ [ [ [7 Partially demolis0 0 [ [ [ [ Grade 5 )rarily demol 7 7 7 O [ Wholly demolish 7 7 7 7 [ [ Partially demolis 7 0 7 7 [ 0 Grade 6 )rarily demol 7 [ [ [ [ [ Wholly demolish [[ [7 [7 [7 [7 Partially demolis [ [ 0 [[ [7 07 subtotal )rarily demol [7 [7 [7 [7 Wholly demolish [t [7 [[ Partially demolis[ Grade 1 )rarily demol [[ [7 Wholly demolish 7 7 7 7 [ [ Partially demolis 7 7 7 7 [ 0 Grade 2 rarily demol [ [7 [7 [ [ Wholly demolish [7 [7 [7 [7 [[ Partially demolis [7 [[ 7 [ n Grade 3 )rarily demol [ Temporary Wholly demolish [ [ [ [ [ [ structure Other uses Partially demolis [[ [ [7 [l before expiration Grade 4 )rarily demol 7 7 7 7 [ [ Wholly demolish 7 [ 7 [ [7 Partially demolis [[ [7 [7 [7 C7 page 17 of 84 wUS-l eSummeaTP oT comwensTion Tor permanentiLy aiiectea nouse witn rroperty rigni,nouse-oni -_ r H H n, _ n . rH ccc Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Grade 5 )rarily demol H H H H Wholly demolish El H E E E Partially demolis H H H Grade 6 )rarily demol Wholly demolish El H H Partially demolis H H H H H subtotal )rarily demol l H H H H Wholly demolish Hl C Hl Partially demolis H H H H Grade 1 )rarily demol H H H Wholly demolish HH H H Partially demolis Hl H H H H Grade 2 )rarily demol H H H H H Wholly demolish Hl H H H H Partially demolis Hl H Hl H Grade 3 )rarily demol l H H H Temporary Wholly demolish H H structure total Partially demolisH before expiration Grade 4 rarily demol H H H H H Wholly demolish H H H HH Partially demolis H H HH Grade 5 )rarily demol Wholly demolish HH H Partially demolis H H H H H Grade 6 )rarily demol H H H Hl H Wholly demolish H H H HH Partially demolis H H H H H subtotal Irarily demol H H H H page 18 of 84 uost estimate oi compenstilon ior permanentiy aitectea nouse wj.tn rroperty rignt, nouse on Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Wholly demolish L2 F] F] F F] _ Partially demolis El El F] F] Li Grade 1 )rarily demol El FF F] Wholly demolish El Partially demolis El Grade 2 )rarily demol r r F] Wholly demolish l r 1.00 8.21 Partially demolis: El rF Fr] 1.00 18.50 Temporary Grade 3 )rarily demol LI F] El r r] structure Wholly demolish rF F] F] E l] after Housing Partially demolis El El El FF expiration/ llegal Grade 4 )rarily demol ] ] ] F] F structure Wholly demolish El rF F] El F] Partially demolis El F] r F] El Grade 5 )rarily demol ] ] ] r Wholly demolish l r r Partially demolis ] ] r o ] Grade 6 )rarily demol ] F] l r Wholly demolish ]l El E] 1.00 8.21 Partially demolis ]l F] F] 1.00 18.50 subtotal rarily demol El FF F] F] Wholly demolish El F] F] Partially demolis rF o Li Grade 1 rarily demol rF F] r] Wholly demolish, Partially demolis El. Grade 2 rarily demol Wholly demolish , r r r page 19 of 84 LOSt estimate oI compenstion ior permanentiy aiiectea nouse wltn rroperty rignt,nouse on I L LF L _ __ F F]I [7 .___________ Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Partially demolisl F] F] n] n El F] Temporary Grade 3 rarily demol El El El F] F] El structure Wholly demolish El El F] F] EE after Shop Partially demolisl El F F] _ _ _ _El expiration/i Ilegal Grade 4 )rarily demol n n n G n n] structure Wholly demolish, El El GF El LI Partially demolisl F] F] El F] El Grade 5 )rarily demol El n F n El Wholly demolish, El F] n E F] Partially demolisl n F] n F] Grade 6 rarily demol l n F] G n Wholly demolish, F] L F] F] El El Partially demolisl F] F] El El subtotal )rarily demol El F] F] El Wholly demolish El F] F] FF F] Partially demolisl El F F] El Grade 1 )rarily demolF Wholly demolishF Partially demolisl El F] F] FF Grade 2 )rarily demol F] F] n G n Wholly demolish, l ] l l n G Partially demolisl ] ] ] ] n F Temporary Grade 3 )rarily demol El F] n F] El LI structure Wholly demolish E] FF F] F] F] after Office Partially demolisl expiration/i Ilegal Grade 4 )rarily demol ] ] ] n G F structure Wholly demolish G F] F] n F Partially demolis ] ] ] ] G n page 20 of 84 LOST estimate OT compenstion ior permanentiy aiiectea nouse witn rroperty rignt,nouse on [7 [7 _____ [7 [7~~~~~~~~~~~~~~1 [7 [77 [7 Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Grade 5 )rarily demol [7 [7 [7 [7 [7 n7 Wholly demolish [7 [7 [7 [[ Partially demolis [ [ [ [ Grade 6 )rarily demol [7 [ [7 Wholly demolish [ [7 [[ Partially demolis [ [7 [l subtotal rarily demol [ [7 Wholly demolish [7 [7 [7 [7 Partially demolis [ [7 [7 [7 [J Grade 1 )rarily demol [ [7 [7 [7 [[ Wholly demolish [7 [7 [7 [7 Partially demolis [7 L[ [7 [ n Grade 2 )rarily demol 7 [[ [7 [ [ Wholly demolish [7 [7 [7 [7 [7 [ Partially demolis] [ E [[ [7 n7 Temporary Grade 3 )rarily demol [7 [ [7 structure Wholly demolish [7 [7 [7 after Foctory Partially demolis expiration/i building Ilegal Grade 4 rarily demol 7 7 7 7 [ structure Wholly demolish [7 [7 [7[ E[ [7 Partially demolis [7 [7 [[ [7 [7 Grade 5 )rarily demol [7 E[ 7 [ [ Wholly demolish [7 7 7 7 [ Partially demolis [7 [7 Grade 6 )rarily demol 7 7 [ Wholly demolish [7 Partially demolis [ [77 subtotal )rarily demol 7 7 [ page 21 of 84 _ _ ost esTiate OT nompenstion Tor permanentiy aiiectea nouse wltn rroperty rigni.nouse on Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Wholly demolish, n n n El Partially demolis n 7 3 [ n n Grade 1 )rarily demol n n n n 3 n Wholly demolish 3 0 7 7 n n Partially demolis 77 Grade 2 rarily demol Wholly demolish El 7 Partially demolis 7 77 7 Temporary Grade 3 )rarily demol structure Wholly demolish 7 7 7 7 3 after expiration/i Other uses Partially demolis 7 77 7 llegal Grade 4 rarily demol 7 7 7 7 7 structure Wholly demolish 7 77 7 Partially demolis 7 L 7 7 7 7 Grade 5 rarily demol 7 7 77 Wholly demolish El n7 El Partially demolis 7n 7 7 7 37 Grade 6 rarily demol 7 7 7 7 7l Wholly demolish 7l 7 7 7 7l Partially demolis 7l 7 7 7 subtotal rarily demol 7 7 7 7 Wholly demolish 7 7 7 7 L I Partially demolis 3 7l 7 7 7 Grade 1 rarily demol 7 7n 7 E 7 Wholly demolish 7 7 7 7 7 7 Partially demolis 7 7 7 7 7n Grade 2 )rarily demol 7 7 7 3 7 7 Wholly demolish 7 7 7 7 1.00 8.21 page 22 of 84 ILoST estimate oT comnipnstion ior permanentiy aiiectea nouse witn rroperty rignt,nouse on Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Partially demolis H H I] H 1.00 18.50 Temporary Grade 3 rarily demol H H HH structure Wholly demolish C C C E H after total Partially demolis El H C C n expiration/i Ilegal Grade 4 rarily demol H H H E c H structure Wholly demolish H H H HH Partially demolis H H H Hl H Grade 5 )rarily demol H H H H Wholly demolish HH H Hl Partially demolis HH HH Grade 6 )rarily demol H H H HH Wholly demolish HH H 1.00 8.21 Partially demolis HH H 1.00 18.50 subtotal )rarily demol HH H H H Wholly demolish HH H H Partially demolis H H H Grade 1 )rarily demol H HH Wholly demolish H H HH Partially demolis H H H HH Grade 2 )rarily demol H H H H Hl Wholly demolish 16.00 2,229.91 2,539.16 5,662,109.17 10.00 336.51 Partially demolis 11.00 1,830.47 2,636.45 4,825,945.34 10.00 581.03 Grade 3 )rarily demol H H H H H 0.08 Wholly demolish H H H HH Total Housing Partially demolis H H H HH Grade 4 )rarily demol H H H H H H Wholly demolish H H H H H H Partially demolis H H H H page 23 of 84 _ LosTI esmar. Or compenstlion ror permanentiy aiiectea nouse wlin rroperty rignt.nouse on n * b H b r b b LIC Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Grade 5 )rarily demol . El Wholly demolish r c El Partially demolis H H H C H H Grade 6 )rarily demol 2.00 17.68 550.00 9,724.86 2.00 2.27 Wholly demolish 16.00 2,229.91 2,539.16 5,662,109.17 10.00 336.51 Partially demolis 11.00 1,830.47 2,636.45 4,825,945.34 10.00 581.03 subtotal )rarily demol 2.00 17.68 550.00 9,724.86 2.00 2.35 Wholly demolish H H b H b E Partially demolis H H H H H H Grade 1 )rarily demol H H H H H Wholly demolish H H H H H Partially demolis Hl H H H H Grade 2 )rarily demol H H H H H Wholly demolish 3.00 65.83 2,550.00 167,876.06 6.00 112.51 Partially demolis 4.00 573.16 3,826.50 2,193,183.63 6.00 90.77 Grade 3 )rarily demol H H H H H 24.16 Wholly demolish H H H H H Total Shop Partially demolis H H H H H Grade 4 )rarily demol H H H H H H Wholly demolish H H H H Partially demolis H H Grade 5 )rarily demol H H Wholly demolish H H H H H H Partially demolis H H H H Grade 6 )rarily demol H HH 1.00 3.87 Wholly demolish 3.00 65.83 2,550.00 167,876.06 6.00 112.51 Partially demolis 4.00 573.16 3,826.50 2,193,183.63 6.00 90.77 subtotal Irarily demol H H Hr 1.00 28.04 page 24 of 84 ost esiimDate oI compenstion ior permanentiy ariectea nouse wltn rroperty rignt nouse on Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Wholly demolish O7 7 7 Partially demolis E l C O 7 C Grade 1 )rarily demol C 7 7 C C 7 Wholly demolish 7 7 7 7 7 7 Partially demolis 7 7 7 Grade 2 )rarily demol 7 7 7 C 7 7 Wholly demolish 7 7 7 7 1.00 57.26 Partially demolis 1.00 53.43 3,570.00 190,749.23 C 7 Grade 3 rarily demol 7 7 7 7 C 7 Wholly demolish 7 7 7 7 7 Total Office Partially demolis 7 El Grade 4 )rarily demol 7 7 7 7 7 7 Wholly demolish C C C 7 7 7 Partially demolis C 7 7 7 C C Grade 5 )rarily demol C 7 Wholly demolish 7 7 7 7 7 7 Partially demolis C C 7 C C Grade 6 )rarily demol 7 7 7 7 1.00 1.94 Wholly demolish 7 7 7 7 1.00 57.26 Partially demolis 1.00 53.43 3,570.00 190,749.23 7 7 subtotal )rarily demol 7 7 7 7 1.00 1.94 Wholly demolish C 7 7 7 C C Partially demolis 7 7 7 7 7 7 Grade 1 )rarily demol C 7 7 7 C C Wholly demolish E l 7 7 7 7 Partially demolis 7C 7 7 7 7 Grade 2 )rarily demol C 7 7 7 C 7 Wholly demolish [ 7 7 7 7 7 page 25 of 84 _ _ cost estimate OI compenstion ior permanentiy aiiectea nouse witn rroperty rigni.nouse on Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Partially demolis [l [ [l [7 17 [I Grade 3 rarily demol [ [[ [7 [[ Wholly demolish [7 [[ Total Foctory Partially demolis [[ [7 7 [ n Grade 4 )rarily demol [[ [ [ [7 Wholly demolish, [7 [7 [[ Partially demolis [7 [7 [7 [7 [l Grade 5 )rarily demol [I [O [I [7 [7 [7 Wholly demolish 7 7 C [ [ [ Partially demolis [7 E7 Grade 6 )rarily demol [7 [7 Wholly demolish [7 [7 [7 [7 Partially demolis [7 [7 [ [7 subtotal )rarily demol [7 [ [ [7 Wholly demolish [7 [7 [7 [7 [7 [7 Partially demolis [7 [7 [7 [n [7 [7 Grade 1 )rarily demol [[ [l [7 [7 [7 Wholly demolish [[ [[ Partially demolis[ Grade 2 )rarily demol Wholly demolish [7 [7 1.00 114.34 Partially demolis [n [7 [7 [7 [[ Grade 3 )rarily demol [7 Wholly demolish [7 Total Other uses Partially demolis [7 [ [7 [l Grade 4 )rarily demol [ [ [ [ [ [ Wholly demolish [[7 Partially demolis page 26 of 84 losr estimate oT compenstion ror permanentiy arrectea nouse wltn rroDerty riglt,nouse on0 Frame structure Composite quantity Floor area Unit price Total price quantity Floor area Grade 5 )rarily demol l Li Li Li Wholly demolish El oi Li l l L Partially demolis nL n n o o Grade 6 )rarily demol n El oi Wholly demolish O n 1.00 114.34 Partially demolis El ci n L o subtotal rarily demol OLi El n o Wholly demolish Li Li LL Partially demolis Li Li l l Grade 1 )rarily demol LI Li l l Wholly demolish El El Li Li El Partially demolis LL l Li l Grade 2 )rarily demol LL Li L Wholly demolish 19.00 2,295.75 2,539.47 5,829,985.24 18.00 620.61 Partially demolis 16.00 2,457.06 2,934.35 7,209,878.20 16.00 671.80 Grade 3 rarily demol O i i n o 24.25 Wholly demolish O n i i o Total total Partially demolis El El Li El El Grade 4 )rarily demol Li nL Li Li Li Wholly demolish nL L Li Partially demolis LL El Grade 5 )rarily demol l n o Wholly demolish nL n Li n L Partially demolis nL Li El Grade 6 )rarily demol 2.00 17.68 550.00 9,724.86 4.00 8.08 Wholly demolish 19.00 2,295.75 2,539.47 5,829,985.24 18.00 620.61 Partially demolis 16.00 2,457.06 2,934.35 7,209,878.20 16.00 671.80 subtotal rrarily demol 2.00 17.68 550.00 9,724.86 4.00 32.33 page 27 of 84 __ UOSIT eSTm ale OI compenstion ror permanentiy arrectea nouse wltn rroperty rigni,nouse on -- r, [rEl [c L] [r n7 n7 nn -- Frame structure J Composite I I I quantity |Floor area lUnit price ITotal price quantity IFloor area page 28 of 84 resinenulal poIT. nIStorlcaIIy Use1 nouse, lemporary structure Deiore explration, snarea Dy H~~~~~~_ _ A H H HH structure Brick and timber structure _ Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price H n H El LI 2,600.00 2,105.35 H H H H H H H H 2,600.00 942,373.77 H H H H H H H H o H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H 500.00 968.70 H H H H H H 2,600.00 2,105.35 HH 2,600.00 942,373.77 500.00 968.70 HH H H H H H HHHHHHHH :o] olv42 n | I 0 nEl l 11 5,540.00 61,729.45 Hl HHH page 29 of 84 L resflaeti al pilt, ni -nnrircaiiy usea nouse, Temporary structure Deiore expiratlon, snarea DY [C [o I I 1,o- structure Brick and timber structure Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 5,540.00 185,580.14 [l [O [i [G [[ [l [l 650.00 15,651.77 [i [ l [ [ [ [ [ [O [G [O [G [ [O [O [0 [G [ [O [7 [l [[ [C [l [l [l [7 [l [ [l [ [7 [G [7 500.00 1,937.40 l O l [7 [l [ [ 5,540.00 61,729.45 7 7 7 l [ [ [ G 5,540.00 185,580.14 [ [7 [7 [7 [7 [ 629.21 17,589.17 [7 [7 [[ [ [7 01 C El GElGO0 3,280.00 187,804.60 El El G1 El El b G ~ ~ ~ ~ ~ ~~~~pg 30 of O 840b [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7age[30[7f[8 [7 [7 [7 7 [7 [7 [ [7 [7 [ iresicientiai pioT, nistoricaiiy usea nouse. temporary sTrucTure Deiore expiration. snarea DV _ structure _______Brick and timber structure Simple structure _______ Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price c~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~E c F 500.00 968.70 H H HEH Hl ElH Hl 3,280.00 187,804.60 H1 H1 HEH H1 H 500.00 968.70 HH H H Hl Hl ElH n HH H H H H H H HcH H H H H H H H H HnH H H H H H H H H H H H H H H H H H H H H H H H H H H H H HcH H H H H HcH H H HnH H H H HH H Hc H H H H H H H H H H H H H H H H H H H H H H H H H H H H HcH H H H H H H H H H H c H H H n H H H H H H H H c H H H H H H H H H H H H H H E H H H H H H H H H H H H H H H H H H H H H H page 31 of 84 reSliaential piot, nistoricaiiy usea nouse, temporary STructure Deiore expiration, sniarea Dy structure _______Brick and timber structure _______Simple structure ______ Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price W~~~~E El E T'l l b LI E i O ,r V V V V V V V V o . o n ,r V V V V n ID El O1 O 11 O OC O El OEl COO O- El El O1 El O5 1O El El O] O O C El o~~~~1 n o or O V V V V V V V V o~~~~~~~~~~~~~1 n] o o rElo5 3 ,635 .90 251,639.401 El O1 C O1 O Di I C7 l VIV V V V V V V f V V _'A V V V VVV o ~~ V V V V V V V Vr structu V Vrc V n Vibe Vtutr Vipl VtrV c VuV Unit~ Vrc Voa Vrc Vuntt Vlo Vre Vni Vrc Voa rc uniy Forae ntpc oarc V V V V V V V V! Vr V V V V V V V V V V V V V V V V Vae 32of V , resinenti a plot,nistoricaiiy usea nouse, temporary structure Deiore expiration, snarea Dy structure Brick and timber structure Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 2,848.73 1,127,953.91 2 H El El El 650.00 15,651.77 C C O C C C c1 ri1 l1 500.00 3,874.81 11E - 3,635.90 251,639.40 ElElr 2,848.73 1,127,953.91 C11 1E 613.48 19,526.57 ElLCl lE Elc r 2,350.00 769,610.31 2.00 36.29 2,150.00 78,018.12 0Er 2,350.00 470,171.07 El El El c El cLcI 650.00 55.03 O- l1 page 33 of 84 resIaenLIal ploT,,n1sToricaiiy usea nouse,temporary structure Deiore expiration. snarea Dy structure Brick and timber structure Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 2,350.00 769,610.31 2.00 36.29 2,150.00 78,018.12 77 2,350.00 470,171.07 F] 7 El 650.00 55.03 2,350.00 238,207.7'5]cc 2,350. 134,593.07 650.00 55.07 c 7 7 7 7 7 7 7 c~~~~~~~~~~~~~~~~~~~~~~~L c] Elc 2,350.00 238,207.75 El oE.cc 2,350.00 134,593.07 7 7 7 7 c 7 650.00 55.03 7 7 7 7 7 7 page 34 of 84 la~es,nential pioT,nistoricaiiy usea nouse,temporary structure Deiore expiration, snarea y_ _ r~~~~~(- 2 n n.n 2 n r.mn 2 structure Brick and timber structure Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price U El El EJ 1U El Li El El El UU U] El UEU Ul U E 2 l U U U U U U U 2 U2 U U U U U U U n U U2 U UU U Ul r U Ul U Ul U U U 2 U El U Ul U U U El U U U Ul U U U El U UU U U U U U U U U U U U U U U U U U U U U U U UL U2U U U UU U U. U U U U U U U U U U U2 U U U U U U U U U UEU U U U U UU Ul U UOU UU Ul U U l U U U U U U U U U UnU U U Ul U U U U UrU U U UU Un U l n U U U U U U U UU U U U U U U U U U U U U U U2U page 35 of 84 IresInenTiai ploT, nlsTorlcaLLy usea nouse, temporary sTructure Deiore expiration, snarea Dy _ structure Brick and timber structure Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total prce [7 [7 [ [ [ [ [ [n n1 nEl nno [ 7 7 7 7 7 [ [ [ [ [7n[7 [7 [7 [7 [7 [7 [ [ [7 7 [7 [7 [7 [7 [7 [7 [7 [r 7 [7 [7 [n [7 [ [ 7 l [ [ [ 7 [7 [ [7 [7 [7[ 7 7[ [ 7[ [7 7 7 7 [7 7 7 7 [ [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 7 7 7 7 7 7 7 7 [ [ [7n[7 [7 [7 [7 [7 [7 [7 [ [ [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 o o o o n o o o oae o6of 8 [7 [7 [7 [7 [7 [7 [7 [7 [7[ [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7[ page 36 of 84 i resiaentiai ploT,nisToricaiiy usea nouse,temporary sTrucTure Deiore expiration. snarea DY structure Brick and timber structure Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price F] F] F] F] F] F] F] F]1 El F] El El F] El F] F F] F] El o] F] o C] F] El El o oo F] F]~~E F]F]F ElF]F]F F] F] F]~~E El El F] F F] F] El F F] F]~~E F] ElF ] ]F F]I F] F] F] ~~F] F] F] LI F] F] F] El o~~~~E o1 C E C1 o o oEo LI F] F]~~E F] F] F] F] F] F] F] F]1 2,350.00 1,007,818.06 2.00 36.29 2,150.00 78,018.12 F] F] F] F] 2,350.00 604,764.14 El El F] F]lF El F]lF 650.00 110.06 El F] El F]F]F F]F F] F] ~~ ~ ~~ ~~F] El El El ElF]F]F F] F] F] F] ] F] F] F]EF F] F] ~~~F] F] ElF]F]F El El El F] F]~~1 F] F] El El ElF]F F] F] F F] ] F]F]EF F] El F] F] F F] ] F]F] F F] F] F] 2,350.00 1,007,818.06 2.00 36.29 2,150.00 78,018.12 F] El F]lF 2,350.00 604,764.14 F] F] F]lF F]F F]. F] 650.00 110.06 Eli Eli Eli El lF F]lF page 37 of 84 resiaenTlai pIot.nistoricaiiy usea nouse,temporary sTructure Deiore expiration. snarea Dy n~~~~( 3 na 3 ~ n Cins0 C structure Brick and timber structure Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price [7 [7[ ] [l [7 [7 [7 [7[ [7 [7 1.00 99.54 550.00 54,747.00 [7 [7 [7l[ [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 E~~~~1 3 1.0 99.5 El.0 5,470 3~~~~~~~~~E F] F] El 3El3O C~~~~1 31 n El E r. ln l 1 3 3.0 995 350 54,747300 3 500.0( 164.35 El 31 3F]E3 C ~ ~ ~ ~~ E 1.0 99.5 El.0 5,470 500.0(~~~E 16.3 3ECCl page 38 of 84 resiaentlai piot,nistoricaiiy usea nouse, Temporary structure Derore expiration, snarea Dy structure Brick and timber structure Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price El 31 31 El 3 El El 3 G 3 G G G 3 G G G G3 3 3 G G G G 3 n G3 G 3 3 3 G 3 3 3 3 G 3 3 G 3 3 b 3 3 3 3 3 3 G 3 G G G LI E G G El GEGGl 3 C 3i 3 3 G 3 G G 3 3 3 3 3 3 3 3 3G3 3 3 3 3 3 3G 3G 3 3 b 3 3 3 G 3 3 3 3 3 3 3 3 3 n 3 3 3 3 r 3 3 3 3 G 3 G 3 3 3 3 3 G G G 3G3 3 3 3 3 3 3 3G3G3G3G3 31 3 3 31 3333 3 3l 3 3 3 3 ~~~~~pge39 3o3 34 3 3 3 3 G 3 3 G 3G 3 3 3 3 3 3 G 3 3 G page 39 of 84 I reslaential plot,nisToricaiiy usea nouse,temporary structure neiore expiraTion, snarean_y r, ~ ~ ~~~ ~ ~ r. n r r- r r vc structure Brick and timber structure Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price [I F] []~~~~~~E F]F]FF]]F]] F] F] F] F] F] F] F] F] F] ElFE c] F] F] FL E LI El I] r cc F] F] F] F]~~~ ~ ~~ ~ ~~ F] F] El ElF]F El Lr c El El rElcn F] ElF ] ]F F] F] F] El r El c El E r1 E o1 rr 0 ~ ~ ~~ El n1 c El r c rEcl El n] n r El F] n r F] F]~~~ F] El F El El]F F] F] F]~~E El F F] LI ElF]F]F F] F] F] F]~~~~~~~~E El El F]F]F]F F] F] F] F] F] F]~~~~~~~~~~~~~~~E ElF]F F] F] F] ~~ ~ ~~~F] F] El F]F F]lF F] F]cF] F] F] F] El 2.00 175.04 350.00 61,262.71 c~~~~~~~~~i El c] El Ellrr c r o r | r r n cae r0of 8 F] F] F] F] F] F] F]Fr]F F] F] F]Fn]F ]F]F F]~ ~ ~ ~ ~ ~ ~~~~~~~~~~20 F].0 35.0 F]1,262.71] ] F F] F] c F] F] F] F] F] F] F] F] F] F] F] F] F] F]ageF40FofF8 r resaIenTIal plot,nisToricaiiy usea nouse,temporary structure Deiore expiration, snarea DY n(n n ------ 1o l n structure | Brick and timber structure Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price [7 [7~~E [1 [7 [7 [7 [7 [7 [7 [7- 650.00 74,317.75 [[ [7 [7 [[ ~ [ [7 [7 [7 [7 [7[n77[ 7 ~ [ [7 [7 [7 [7[n7[7[ [7 [7 [7 [7 [7 [7 1 n n n El nEnl 650.00 74,317.75 [ 7 [ 7 7 [ El E n1 E n El [7 [[ [ [ [ [7 E 7 [7 [ [[ [[ [7 [ [ 650.00 74,317.75 1.oo 99.541 550.0c1 54,747.00a El ElnlE page 41 of 84 resincenTla ploT, nlstorically usea nouse,Temporary structure oeiore expiration, snarea uy structure | Brick and timber structure | Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price V V V V1 V1 2.00 175.04 350.00 61,262.71 C V V V V V V VEV V VCV V V V V V V V Vl V V V V V V VV V V V V V VnV V V V 500.00 164.35 V V V V V 650.00 74,317.75 1.00 99.54 550.00 54,747.00 V V V V Vl V V V Vl Vl 2.00 761,262.71 500.00 164.35 V V V VC o~~~~ ~pg 42 of 84o V V V V V V V.0 V67 V V V V V V Vn V V V V V Vo V V V V V Vo V V V V Vo V V V VC -VVV VC V V V V V 3.0 467o V V V V V V V V Vae 42of V resiaenTlai plot,nisToricaiy usea nouse temporary structure Deiore expiration, snarea py El 3 0 0 nEI . n structure Brick and timber structure Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price O 0 3 O O 0 3.00 46.72 O O o o o o iH o o C C o O O 3 O O O O C C O O O O O O O C C O O O O O O O O C C O O O O O O O O C C O o o n o o o o c c o o o H o El o o E l o H E o n H H H H o H H H H H H H Hl H H H H H H H H Hl o H H H H H H H H H o H H H HH H H H o Ho H H H H H H H El o o E. 2 El o CC page 43 of 84 iresiaentilai piot,nistoricaiiy usea nouse. temporary stcructcure Deiore expiration, snarea py _ O__ __ _ _ O 3 O O 3 O O structure _______Brick and timber structure _____________ Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price G S E~~1 El El LI El El LI o ~ ~ ~ ~~ LI o1 El on El El El El El El El El o El o El El O El El E El CO El G El El F El 2 LS El El El o El oErol n~~~~~~~~E cEGl El E El El El Unit price Total pri e l qatt Eloo are Umt pric Tota prcuniy Foraentpi e Ttl pnc G El E E 3 3 G 3 O El O O El O El page 44 of 84 t resicentlai piot,nistoricaiiy usea nouse,temporary structure Deiore expiraTion, snarea Dy Li~{ fi LiL L i iLiL structure Brick and timber structure | Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Li ~ Oi Oi L!L L i i Li Li ~~ ~ ~~~li Li L-i Li Li Li LL Li Li Li Li Li Li Li Li Li Li Li ~~~LI El El Li- Li LiL i Li O~~~~1 El E O 03 Li Li Li Li~~~~~~~~~1 El Li LI El El El Li Li Li ~~ ~ ~~~~~ ~~li El ElL LILii Li Li Li ~~ ~ ~~ ~ ~~ ~~l El LI Eil Li Li Li Li Li Li~~~~~~~~~1 Li Li Li El ElL Li Li Li Li Li LiLiLiL LI page 45 of 84 - resiaenuiai plot,nistoricaiiy usea nouse,temporary structure Deiore explratlon, snarea Dy n~ ~ ~~( c na c n c,nn c,c L structure Brick and timber structure Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price El LiL L i iL L LI Li Li~~1 Li Li Li Li I EiIli El El LI Li Li EiL ili Li El Li L LiLi EiLili LI Li Li Li Li Li~~~~~~~~~~~~1 Li 3.00 46.72 Li Li Eli Eli ELiLiLili LI i i i i i i i i n Li i oL i L El El L Li Li Li LilLElLI Li Li L L page 46 of 84 L re-sinenua piot, nistorically usea nouse,emporary structure Deiore expiration, snarea D_ n n E 2 r( . r.g n r structure Brick and timber structure Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price r] LI El LI L EIlI LI LI El L-I 2.00 32.88 LI El 6.00 141.75 El El El LI El LIL El 2.00 65.39 IL LI LI LI LI LI EIL IlI LI L] LI LIL I IL L IL LILIL LI LI L LI0 LI LI LI nI LI LI I l El LI LI L nl LI LI2.00 32.88 LI LI 6.00| 141.75 LI LI LI I I L LoL 2.0( 65.395IL nI LI l Ll El I I L rI LI LI nL I nL L L LI LI I LI El LIL I IL LI ~~ ~~lI 1.00, 11.65, FL El FlLLII page 47 of 84 IV8 Jo 8t ao2d 3 Li 3 3 3 L 3 L Li| Li Li El LiLiL FL Eili Li Li Li Li I Li El FL Li LI LI Li Li FL Li L Li Li El Li Li Li LI El Li Li FL LI FL Li Li Li Li Li L LI Li Li Li Li L i Li Li LI Li Li Eli LI Li Li Li Li Li Li Eli Li Li Li Li LI Li Li Li El Li Li Li El LiL Li Li Li Li Li Eli Li Li Eli Li Li Li Li Li Li Li Li L LI Li Li Li Li Li Li Eil Li Eg'MO00,0t 9E0 Li Li Li LI Li i Eli Lip IiE19z 001 Li Li Li EliL LI Li Li Li Li Li Li 99I 001 L Li I Li Li L EJ Li El LI FL L El El Li Li Li Li Li Li ElL Li Eli LI Li Li Li LI Li LiL Li Eli Li Li Li Li Li LiLiL -i Li Li Li Li Li LI LiL LI Li El Li Li LiLiLi LI EliL Li Li ~~ ~ ~~Li EiLil Li LI Li L Li LiLiL LI L iL iL Eg'M 009t 9EV0 Li LI Li Li FLi i Li Li IEtg 001 Li Li Li EliL Li 3~~~~~~~~~~~~~(Tun 30 3 U 3 33 3b D3ud juoJL ~aud p!un LawM 1001A X!iind puloj z)o!d pluf ra i001j Aiiujn od juo o3lud 1!ufl anjo~nals aIdwTS ejnqonails x~qWTI PUP )Olq anToJg Li IJ Li iL Li El Aa DC1 PUs uoTaidxa Gjoiaa atnionlis Alaoilm 1asnOU DeSn ATT333UC02SI1OM 3 3-_U I resiaentiai Plot nistoricaiiy usea nouse.temporary sTrucTure Deiore expiration, snarea Dy (r.4 -- - -- 4 1,\ cI nI rI nI n nl G C n structure Brick and timber structure Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price LI El El LI L Li GL El El LI El LI G El LI E l El G El LI El E L LI LI l I LI LI LI L Cl El Ll LI El LI LI I I I L LI LI El LInLI l El LI LL LI LI LIGLI LI LI Ll LI LIn LIGLI LI l LL GL G GC El El LL Ll L El LI L El LI LL LL El GI LI LI El L L L LI L L LI L LI Ll LI LI LI LI LI LI L LI LL L El LI L E El L L LI LI 1.00 88.56 L L LIGLI Ll LI LI El LI LI El LIGl L LI LI LI LI L L L Ll LI LI L L LI LIOLI LI l LI LI LI LI L L LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI El G LI El Ll L LI G LI El El I Ll L L El nI LI L LI I LL CL El n LI l .L nl El 1I LI G l LI LIL El GI LI I, CI LI LI L LI LI ElI 1.00 88.56 LI LI nL El El ElI L LI El LI E El page 49 of 84 CD CD~~~' CD &~~ 1:1 El 1:1 1:1 1:1 1:1 El 1:1 El El El El El El El El El D 0 EJ El D E E El El --1 D~~~~~~~~~~~~~~ o Li C-, 'CD rO 0 CD 0 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~CD EEEEEDEEEEEELiLiEE]LiLiELiLi ~~~~~~~~~~~~~~~~~~~~~~CD CD ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~C Jio5 0 LI CD~~~~~- - - ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~CD 0~~~~~~ _ __ - ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~CD ~~~ ~CD 00 0 -.0 'in 0 , l , l , l , l , l 11 D 11 , J , -J ,D [: , El , , E I 0 , 11I 11 I I L , D I 1: I l I I El I :l IEl i resiaenTiai plot, nistoricaiiy usea nouse, temporary strucTure Deiore expirato snarea -nyˇ _- (n;' 4 nf nf F] F l7 1- 0] IJ O] F 3] O structure Brick and timber structure Simple tructure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 3] F] F] F] El OO 4.00 179.26 El El 3] O] O] F] O] O] F] 0.35 350.00 123.53 O] O] O] F] E O] OF F] O~~~~~~~ ~E O1 O1 0 O E OE3l F] F] F] ~~ ~ ~~ ~ ~~ ~~F] F] F] F] F]1 F] O~~~~E O1 O El El El OE3 F] F]~~E F] F F] F] F] F] F] O] F] 4.00 70.09 O F 7.00 173.84 F] El El El F] ] O F 4.00 179.26 O] F] Li F] F] F]F F] CO 0.35 350.00 123.53 El O1 O 1 C El El El 3 El F] F] F] F] F] F] F] F] ~~ ~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~F] F F] F]~~1 F] F] F] F F] El El 2,293.29 771,715.66 5.00 168.71 786.96 132,765.12 9.00 188.47 FF 2,431.12 1,412,544.84 ,] F] F] F] 2.00 65.39 FF 650.00 55.03 O] El Li O El FF F] F] F] El F] o] El n F] LI o l o E c o F] El F] El FI. F] F] O] F] El F_ O F O O] F] O] F] F] O] F] F] F] F] page 51 of 84 resiaential piot,nistoricaiiv usea nouse, temporary strucLure Deiore expiration, snareanL __ __ __ _ *1 *1 o o .n n1 n . structure Brick and timber structure Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price LI El3 1 13 El 31 31 31 El El El 31 31 El O1 G1 O 31 El El El El 31 El O1 3 31 0n 500.00 1,133.05 01 31 El 31 0 El El El 2,293.29 771,715.66 5.00 168.71 786.96 132,765.12 9.00 188.47 E l 2,431.12 1,412,544.84 03 l 3 1 2.00 65.39 01 505.40 1,188.08 El El O El 31 E l 31 3 31 31 3131 31l3 31 31 3 31 31 3 31 El 31 31 El 31 31 31 3131313 2,665.93 299,937.20 1.00 11.65 3131 31 31 33 3,527.23 320,173.21 31 31 El El 1.00 25.31311 650.00 15,706.79 31 El 31 31 31 0.35 350.00 123.53 31 31 31 31~~~~~~~~E 31 3131 31 31 31 31 31 31 3~ ~ ~~ ~ ~~ ~~131 31131 El 31 31 El 31 313 13 1 El313 El 31 31E13 31 31 31313 31 31 31 31 31 31~~~~~~~~~~~~~~~F 31 El El El El 31 31 31 3 LI 31 El 31 31 500.00 1,937.40 El El 31 3i 31 31 31 2,665.93 299,937.20 1.00 11.65 31. El. 31 El33 3,527.23 320,173.21 31 31 El El 1.00 25.3131 3,11 629.27, 17,644.201 Ell El 3 31 31 0.351 350.001135 page 52 of 84 I res1aenulaipIio, nisLoricaiiy usea nouse, temporary sLructure neiore expiration, snarny _ L nn o - b El nmOO structure Brick and timber structure Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 3 3 L El o c E l o 3 O 3 3 33 3 3 3 3,280.00 187,804.60 3 3 E3 E3 3 3 El~ O] El OEOOl 3 3 3o 3 3 500.00 968.70 3 3 3 3 3O 3,280.00 187,804.60 3 3 3 3 3 3 3 O 500.00 968.70 3 3 C 3 3 O 3 3 o~~~~~~~~F El n] El c1 c co o~~~~~~~~~1 El o EC Eoo page 53 of 84 resiaenilai piot,nistoricaiiy usea nouse, emporary structure peiore expirat1onD, snare nDy _ --;-- ------ structure | Brick and timber structure | Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price ri ni ni ni ni ni 3.00 263.60 232.41 61,262.71 Li Eli LiLil LiE Lil Li Li Li~~~~~1 Li LI LiLiL El Li Li LiLiL LiL L i Li Eli Eli Li El Li Li 3.00 263.60 232.41 61,262.71 l~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~E Li Li Li Li Li El El El n Li Li El El El n El El El Li 650.00 74,317.75 1.00 25.56 Li 1.00 32.09 E ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~~ El o1 o ooo Eli Eili Eil El El Li Li LI E Li Li oL oL El E Li El0 7431.7 El .OC 255Elo.c320 page 54 of 84 _ resiaentiai pioz,nisworicaiiy usea nouse,temporary structure Deiore explraTion, snarea o ~ ~ ~ ~~. cn o n-o n n nin F] F] F] F] L LI structure Brick and timber structure | Simple structure Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price F] F] El F] F]F ]F ]F El El F] F] F] F] El El F F 650.00 74,317.75 1.00 25.56 O] El 1.00 32.09 F] F] F]~~1 El ] F] F] F] F] El F F] F]~~1 F] F F] F] El F] El El F] F]~~E F] El F] El F] F] F]lF F] F]~~1 F]lF ElF ] ]F F] 2,149.13 1,333,775.21 7.00 205.91 644.76 132,765.12 10.00 220.56 F]lF 2,579.22 1,732,718.05 F] El El F] 6.00 354.29 172.92 61,262.71 650.00 15,761.82 F] F] F]1 El F] 0.35 350.00 123.53 F] F]~~1 El El F] F] F] ElF]F F] F]~~~ El F] El F] F] F] El El F] F] El F] F] El El F]lF El El El F] F] F] F] El F] F F] 500.00 4,039.15 F] El F] F] F]F]F]F 2,149.13 1,333,775.21 7.00 205.91, 644.76 132,765.12 10.00, 220.56 F F 2,579.22 1,732,718.051 El F] F El 6.00 354.29 172.92 61,262.71 612.52 19,800.98 El El F] F] El 0.35 350.0 123.53 page 55 of 84 I resiaenTlai pioT, nistoricaiiy usea nouse, temporary structure DeIore expiraTlonnsnarea-ny- -_-- (r. . 1 n,r 11 n LI n El Li n n n structure I Brick and timber structure L Simple structure |Unit price |Total ppnce quantity IFloor area |Unit price quantity |Floor area |Unit price iTotal price page 56 of 84 tnis project ior uatansna proiect _ F] n Attached table: 18.1.AC Total quantity Floor area Unit price Total price F] F] F]~~~~~l F] n ~ n r nf n ~ n n l El 11 Elb n E n ~ n] nf 1.00 0.81 2,600.00 2,105.35 n 6.00 841.97 2,759.47 2,323,390.13 Fi F] LI ] F] Eln El F] n n l F] n n bnf F] n b] n n ci n F] fnn F] n F] nfb F] n n b nf n n] b] fn n El n En 1.00 1.94 500.00 968.70 ni 1.00 0.81 2,600.00 2,105.35 b 6.00 841.97 2,759.47 2,323,390.13 E 1.00 1.94 500.00 968.70 ni oi n nf fi ~ n___ ni nf 1.00 11.14 5,540.00 61,729.45 F] page 57 of 84 inis project ior uatansna project ni ni Attached table: 18.1.AC Total quantity Floor area Unit price Total price 4.00 565.82 4,020.07 2,274,625.11 |[ nL 24.08 650.00 15,651.77 l o| n l Eln| ni El nL El|n ElE El LI Li ElEli 1.00 3.87 500.00 1,937.40 Li 1.00 11.14 5,540.00 61,729.45 L 4.00 565.82 4,020.07 2,274,625.11 Li 1.00 27.95 629.21 17,589.17 L r n n nn r n~ ~~l El -| I. l.OC 57.26 3,280.00 187,804.60 El 1.00 53.43 3,570.00 190,749.23 n1 Li Li El LiLi page 58 of 84 Tnis, o Qect ior uatansna proj ecT _ _ Attached table:18.1.AC Total quantity Floor area Unit price Total price c| l l El El El El El rx 1.00 1.94 500.00 968.70 Ci 1.00 57.26 3,280.00 187,804.60 Ln 1.00 53.43 3,570.00 190,749.23 E 1.00 1.94 500.00 968.70 E C~~~~~~~~E El C [ El El El El C Li Li Li E LI' ci c n c ni c~~~~E c ElC Lici 59 of c Li Li c Li Li Lic C~~L Li CLi Li Li Li LiD~~~~ Li Li Li LiLi~~~~ _ _ _ _ _ _ _ Li Li LiD~~~~ Li Li Li LiD~~~~ Li Lin L Li Li n cLi Li ~ag Li of Li4 __ _ _ tnis pro]ect ior uatansna project _ _ _ Attached table:18.1.AC Total quantity Floor area Unit price Total price O 0 3 O O 3 O0 0 00 3 O O 00 3 0 0 El 3 E O 0 0 3 3 O O0 n 0 O 3 C 3 0 30O C 3 O 30 C E O El C O 3 00 C O 3 0 0 C 0 O 0 0 0 0 0 00 00 3.00 69.21 3,635.90 251,639.40 0 page 60 of 84 _nis project ior vatansna projecT El nAttached table:18.1.AC Total quantity Floor area Unit price Total price 11.00 1,461.22 3,277.24 4,788,764.47 n F-] 24.08 650.00 15,651.77 n 3] [~~] 3] El 7 El 3 El 3737- 37 El3 37] E ] El El 37] E 3.00 7.75 500.00 3,874.81 El 3.00 69.21 3,635.90 251,639.40 El 11.00 1,461.22 3,277.24 4,788,764.47 3] 3.00 31.83 613.48 19,526.57 El 3] El 37 373] 3] 3]~E I,] El3] 25.00 2,580.63 2,518.99 6,500,592.11 El 14.00 1,551.03 2,524.20 3,915,100.05 El 3] 0.08 650.00 55.03 El 37 3~ ~~] Ell 337- 37 3~ ~~] Ell 3737- page 61 of 84 _nis project ior uatansna pro-iect Oi 2Attached table:18.1.AC Total quantity Floor area Unit price Total price o ni n_ _ on3 n[o]o n Lin 2.00 17.68 550.00 9,724.86 El 25.00 2,580.63 2,518.99 6,500,592.11 ll 14.00 1,551.03 2,524.20 3,915,100.05 Li 2.00 17.77 550.48 9,779.89 Li El 11~~~~~~~~~~~g Lo n i 8.00 167.20 2,428.75 406,083.81 Li 6.00 98.11 2,433.25 238,731.72 Li k n~L n n L f; 0 .0 65.0 503 O1 8.00~ ~~E 16.2 2,2.5 40,8.1 3] 6.00 98.11 2,433.25 238,731.72 O1 n ~~~0.08 650.001 55.03 O1 page 62 of 84 _ _Tnis pyoject ior uatansna project n , Attached table: 18. .AC Total quantity Floor area Unit price Total price r~~~~~~] ~~~~F]In Zn [] El n1 nn n n ~~~~nn LI c -I nl n] 5 5 55 F] 11f El LI nI 5 5I 55 LI1 n1 [] _ _ _ _ _ 5 5n n 5n LI n~~F- n] El n- LI LI El page 63 of 84 _nis project ior uatansna projecc __ Attached table: 18. .AC Total quantity Floor area Unit price Total price El ____ El o E l E1 E ElE E E1 E E D1 El o] oE 3] 1 D- ED 3] D [] E 3] E E ~~~~~~~~~~~~~1El El 3] El [33] El3] El En OE 3] o n] Eo page 64 of 84 tnis projecT ior uatansna project _ Attached table: 18. .AC Total quantity Floor area Unit price Total price C1 F ] El o r r~~~E El 1- r Li r H E rl El r1 r r ~ ~~El c1 El El r~~~~1 c El Elr 33.00 2,747.83 2,513.50 6,906,675.92 11 20.00 1,649.14 2,518.79 4,153,831.78Elr r1 0.17 650.00 110.06 ri El H1 H1 F] r r r H E HrH H Hr 33.00 2,747.83 2,513.50 6,906,675.92 H1 20.00 1,649.14, 2,518.79, 4,153,831.78 H1 H 0.17ag 6500 110.064 r Hr H H H H HH~~~~~~~~ H H H HH~~~~~~ 2.00 17.68 550.00 9,724.86 H 33.00 2,747.83 2,513.50 6,906,675.92 H 20.00 1,649.14 2,518.79 4,153,831.78 H 2.00 17.85 550.95 9,834.92 H page 65 of 84 tnis project Tor uiamansna project iZ : . Attached table:18.1.AC Total quantity Floor area Unit price Total price ii| FI 11| F]b 2.00 112.60 567.40 63,892.50 n] nl~~~~~~~~~~~~~~~E Elntb nl n ~ ~~l Eln F]0 0F3 F].0 643 F]F F] F] F]1 F]]1 F]. F]F F]F F]aF] F] of84 1.00 0.33 500.00 164.35 F] F] F] F] F]F] o 's ; F]O F]3 F].0 16435] F] F] F] bn F] F] F] F] page 66 of 84 I8 j0 L9 92pd Zn L i Eln ZnF Li l El El E Z] LI L El E I LI ILI Zn E n n] Zn LIIF Li n] Zn Z~~~~E n n nn n ~ ~~~ n LI nn 0r Li Li Zn LI r LI LI LinF Ir Li L LiLI LI Li Li El ZlE LI LI H2Fl LILIi ooud IP)oj aud I!ufl vmiooii j JOO guenb DVT8:lU p;)qv LII __ ___ __ __ __-- a1Oa-oici leusuleavn ioi oaC~o~adsu tnis pro.lect ior uatansna pro iect O [ Attached table: 18.1.AC Total _ quantity Floor area Unit price Total price r o V o o o L o oo V1 V o E r V V VV c V V oVo c V E nV o V oV c V V c o cV V V V 2.00 175.04 350.00 61,262.71 0 V V V V V V V VVO V V V V V V0V V 0 O pag 68 of 84 V V V VVn V.0 V7.0 V5.0 VV26. V V V VVC V ~ pg V 8 of 84 tnis project ior-uatansna poet ~ _ [7 [7~~ Attached table:IS. 1. AC ____________ T o ta l ____________ quantity Floor area Unit price Total price t nl nl | nEl 11 El El El Lin [7 [7 [7 [l7[7 t n~~~l n1 El l LI 1.00 114.34 650.00 74,317.75 [ [7 [7 [7 [ n[ [7 [7 [7 [ r[ [7n[7 [7 [E[l [7 [o [ [[ [ [7 7 r Li [7 [7 [l [ L[ 1.00 114.34 650.00 74,317.75 [7 [7 [7 [7 [E[n [7 [[ [7[ [ [7 [ [[ 3.00 226.94 609.02 138,210.25 [7 page 69 of 84 tnis projecrT Tor imatansna projecT O OI Attached table:18.1.AC Total quantity Floor area Unit price Total price 2.00 175.04 350.00 61,262.71 n 2.0 1750 35.0 6122.1L 0~~~~~~~~~~~~~~~~~~~~F El c[ El El o LI 71 L D D L 3.0 22.9 60.21 3 21.5 L 2.00 175.04 350.00 61 262.71 L 1.00 0.33 500.00 164.35 L 71 71 71ge 7 of8 3.00 46.72 O 71 71 D L 71~~~~~~ DL 71 ~ ~ ag 71 71 84 tnis project ror uatansna project LI 11 Attached table: 18.1 .AC Total | quantity Floor area Unit price Total price o n nn _ _ _ _ _ _ _ _ _ _ _ _ _ _ ] _ _ _ _ _Fi 3.00 46.72 n n r n ni oin ni fi fi E n n~~~~~~~~~~~~~~~1 nEn fi Lif in7 ni n nnf ni fi fi f n ni pg of 8n n LI LI nfn nI n LI nfn page 71 of 84 tnis project ior uatansna project n n Attached table:18.1.AC Total quantity Floor area Unit price Total price H H rn~~~~~~~ n n fn n n ni fn n n n fn n oi fn n ci n cin n c__ _ n fnn ni c n fn n n n nn H! H H nf H H IHn | -I nEl El page 72 of 84 ,__ inis projieci ior uatansna projecT _ .. n Fi Attached table:18.1.AC Total quantity Floor area Unit price Total price El~~ ~ n El Li L LIL S~~~~1 11 ElS o1 ElES E 1 Fl ] El F El [ El F1 Li Li Li LiL F] El El Li El LiL i ni Lp 73 ofn8 Li Li Li LiLi~~~ Li Li Li LiLi~~~~ Li Li Li LiLi~~~~ Li Li Li LiLi~~~ Li Li Li LiLi~~~ Li Li Li LiLi~~~ Li LiL L Li ~ ~ ag Li Li LiL tnls jproject ior vatansna project n] 3 Attached table:18.1.AC Total quantity Floor area Unit price Total price r P P n r P P P PP P H P HH P1 El El P l HEl H HP ni El__ _ _ _ _ _El Li _ _ _ _ _ _ _ H P 3.00 46.72 n111E HlP PpageP7 ofPH4 P H H HH~~~~~~ H H H PH~~~~~~ H H H nHP P H H PHn 3.00 46.72 n P ~ P H PP P P P PP P~ pg H 4 Pf PP tnis project ior uatansna proJeQ __ _ H n Attached table:18.1.AC Total quantity Floor area Unit price Total price El El O El O 9.00 182.83 3.00 83.89 El El El E~~~~1 Elo 9.0(~~~~~~~E 182. OO 3.00 83.89 F] O1 c~~~ 1 El n 11 H H H HE 9.00i 182.83 HEHl 3.00a83.89 75 Hf H H H HE~~~~~~ H H H HE~~~~~~ H H H HE~~~~~~~~ H H H HE~~~~~~ H H H HE~~~~~~~~~~~~~~~C H H H HE~~~~~~ H H H HE~~~~~~ H H H HE~~~~~~ 9 .00 182.83 H Ho 3.00ag 83.8 Hf H8H Inis project ior vamansna prolect_ C [I Attached table: 18.1 .AC ____________ Total quantity Floor area Unit price Total price 1.00 25.31 C I E I1 0.35 350.00 123.53 n cl 1 ElElE I I I II "I I PI I 1.00 11.65 n E 1.00 25.31 El 1 El I1 0.35 350.00 123.53 El I I~~1 LI II E I1 I1 I i page 76 of 84 I I I II~~~~~~ I I I II~~~~~~ I I c c c I I I II~~~~~~ . I I l.OC ~ ag 76.6 of8 _i_ s project Tor uatansna projec- __ _ _ __ __ C] OAttached table: 18.1 .AC Total quantity Floor area Unit price Total price El F F] ElF F] El El El]F] El E El F] El F]F El F] LI F]F F] El F] El]F] El F] El F]F] El F] F] El El F] F] F]ElF ElC 1.00 88.56 F] F] F] Ell El F] F]F F]aF] 77 of84 Fc n] F]cF F] F]FCF F] C] C]F F] F] F] F]F]~~~~ 1.00 88.56 C]F]F F] C]F F pag 77of8 tnis project ior viatansna projlecT nl 3Attached table: 18.1 .AC Total quantity Floor area Unit price Total price 3 3 ni 3 n n 3 n n C1 3ElTC 2.00 57.65 El El _______ fi fin 3fiFi Elfif Efl 1 2n0 576 fi En F 3 3 El Cn [1 fi fE El n 3i n nf3 n n n C n 12.00 252.13 3i Ci 3 page 78 of 84 _ nis project ior uatansna project _ E l Attached table: 18.1.AC Total quantity Floor area Unit price Total price 5.00 197.76 [O [[ [C 0.35 350.00 123.53 [7 . ~ ~~~~ El [[[[ [2700 [52713 [7[[ [0.00 2 [23.6 0 [7 [n 123.00 2527.13 [7186 6,3,401 [7 5.00 197.76 [0 [7 [7 [l 0.35 350.00 123.53 [7 L *z n~~~~~ [C [7 [E [E[l 40.00 2,923.60 2,246.07 6,566,589.96 07 23.00 2,476.88 2,518.68 6,238,490.18 b7 [7 0.08 650.00 55.03 [7 page 79 of 84 tnis proiect ior uatansna project- ,i EAttached table: 18.1.AC Total quantity Floor area Unit price Total price Li Li EliL i 4.00 19.95 544.32 10,857.91 Li 40.00 2,923.60 2,246.07 6,566,589.96 ni 23.00 2,476.88 2,518.68 6,238,490.18 Li 4.00 20.03 544.77 10,912.94 El Li ci Li rr 10.00 189.99 2,462.30 467,813.26 Li 11.00 689.24 3,646.58 2,513,356.84 El Li 24.52 645.68 15,830.32 L Li Li Li ~~~~~~~~~~~~lLIL 1.00 3.87 500.00. 1,937.40 Li 10.00 189.99. 2,462.30 467,813.26 Li 11.00 689.24 3,646.58 2,513,356.84 Li 1.00 28.39 625.80 17,767.73 Li page 80 of 84 - -__ nis project ior uatansna project Gi ni Attached table: 18.1.AC Total quantity Floor area Unit price Total price El c nl El c El 11 E~~~l c1 r! fi El i fifi1 ni n n fnn 1.00 57.26 3,280.00 187,804.60 fn 1.00 53.43 3,570.00 190,749.23 LI fi LI LI f~~~~~~~~~~~~~~Li Fi cE n El~ El LI n ~ ~ fn 1.00 1.94 500.00 968.70 n 1.00 57.26 3,280.00 187,804.60 nI 1.00 53.43 3,570.00 190,749.23 nI 1.00 1.94 500.00 968.70 LI LI E L fir page 81 of 84 tnis project ior uatansna pro ject ____ .P Attached table: 18.1.AC Total quantity Floor area Unit price Total price 3.00 263.60 232.41 61,262.71 , H n n n n n n n P P 11 El ElS El0 LI.6 232.4 61261 El E ~ ~ ~~ 1 n] n n b P P P n 3.0C 171.98 432.12l 7,17.7 El n P P l n 3P00 171P98 432H12 74P317P75 11 page 82 of 84 tnis proJeci ior uatansna project l C Attached table:18.1.AC Total quantity Floor area Unit price Total price F] F] F] HF] E F] El F] Li]F] 3.00 171.98 432.12 74,317.75 F] F] F] ~~ ~ ~~~F] LiF] E ~ ~ ~ ~ ~ ~~~ C CECl 54.00 3,342.83 2,182.74 7,296,525.57 O] 38.00 3,483.15 2,584.98 9,003,858.96 F H 24.60 645.70 15,885.35 0 El l H HEF]l]CHF H F] F] H~~~~~~~~~~~EF]l 6.00 25.76 534.32 13,764.01 F] 54.00 3,342.83 2,182.74 7,296,525.57 F] 38.00 3,483.15 2,584.98, 9,003,858.96 F] 6.00 50.36 588.731 29,649.36 F] page 83 of 84 Cost estimate of cost for house demolition shared by other municipal I n F] n n] n nP n P [1 Frame structure Composite structure Brick and timber struci Demolised . Demolised Demolised Quantity Urea Unit price Total Quantity area Unit price Total Quantity aea Unit pnce Grade 1 24.00 5,164.53 70.00 361,516.78 50.00 5,639.88 60.00 338,392.56 31.00 2,797.37 45.00 n Grade 2 O O ____ O _ I P n_ o El P Datansh Grade 3 65.00 14,879.48 63.00 937,406.97 76.00 7,204.98 54.00 389,069.13 45.00 2,461.56 41.00 O a Grade 4 274.00 56,912.43 60.00 3,414,745.71 205.00 18,680.42 51.00 952,701.59 73.00 8,118.64 38.00 project Grade 5 O P O 0 O O OO 0 El0 O n] Grade 6 117.00 16,605.49 53.00 880,090.96 136.00 12,198.18 45.00 548,917.92 56.00 6,522.11 34.00 p Subtotal 480.00 93,561.92 59.79 5,593,760.42 467.00 43,723.46 50.98 2,229,081.19 205.00 19,899.68 38.04 page 1 of 2 ror Datansha project (pipe network) nz oi n n Attached table: 18.1.11.1BD ture Simple structure Total Total Quantity Dem Unit price Total Quantity Unit prce Total 125,881.55 16.00 763.20 35.00 26,711.89 121.00 14,364.97 59.35 852,502.78 ___ Li ri Li Li [] Li Li F] 100,923.77 32.00 2,007.52 32.00 64,240.80 218.00 26,553.54 56.17 1,491,640.67 308,508.35 61.00 4,020.60 30.00 120,617.92 628.00 87,879.03 54.65 4,802,451.07 lI Li Ei l] Li L L] Li 221,751.84 39.00 2,846.55 26.00 74,010.26 393.00 39,642.65 44.99 1,783,583.88 757,065.50 148.00 9,637.87 29.63 285,580.87 1,360.00 168,440.18 53.02 8,930,178.40 page 2 of 2 r Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) [7[7 [7 [7 [7 Lii [7 [n E[ n n7 El [o n [o Frame structure | Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Wholly demolished n _____ _ El 1] [o [o 3.00 197.36 3,110.00 Grade Partially demolished 4.00 1,167.78 3,504.47 4,092,452.17 9.00 1,047.02 3,390.00 3,549,392.56 14.00 440.33 3,110.00 1 Temporarily n7 ______ demolished 1 966.7058663 800 773364.693 3 249.9812121 750 187485.9091 1 245.3051724 650 n7 Wholly demolished [ [ [ [O [ [ [O [ [ [O [7 Grade Partially demolished [ O 0 [[ [O [O [7 [ [ [l [7 2 Temporar i 1 y [O demolished O 7 [ [ [71 7 O O O O [ Wholly demolished [O [ [[ [7 Oi [7 [7 1.00 20.70 2,310.00 Grade Partially demolished 5.00 1,322.01 2,880.00 3,807,387.11 11.00 753.14 2,600.00 1,958,152.25 9.00 436.33 2,310.00 3 Temporarily O7 demolished 4 352.0665686 700 246446.598 4 191.3718818 650 124391.7232 4 185.9427242 550 O House Wholly demolished 3.00 131 .02 2,690.00 352,455.03 2.00 240.73 2,500.00 601,828.00 [7 [ [7 P hroper Housin Grade Partially demolished 8.00 756.85 2,690.00 2,035,913.19 19.00 1,378.22 2,500.00 3,445,545.99 9.00 244.41 2,270.00 ty g 4 Temporarily O right demolished 2 79.7084254 650 51810.47651 6 374.2535527 600 224552.1316 4 60.49270844 500 [7 Wholly demolished [ [7 [7 [7 [7 [7 [7 [ [ [7 [7 Grade Partially demolished [7 [7 [7 [ [7 [ [ 7 [ [ [ 5 Temporarily O7 demolished [ [O [O [O [0 [O O_ O 0 OO Wholly demolished 4.00 807.86 2,310.00 1,866,162.20 21.00 1,813.82 2,130.00 3,863,426.85 13.00 610.52 1,940.00 0] Grade Partially demolished 15.00 2,534.66 2,310.00 5,855,072.89 27.00 1,982.38 2,130.00 4,222,461.71 10.00 497.78 1,940.00 6 Temporarily [7 demolished 6 311.7760546 550 171476.83 13 577.9902966 500 288995.1483 5 501.121779 400 El Wholly demolished 7.00 938.89 2,363.03 2,218,617.23 23.00 2,054.55 2,173.35 4,465,254.85 17.00 828.58 2,227.92 ni subtot Partially demolished 32.00 5,781.30 2,731.36 15,790,825.37 66.00 5,160.75 2,553.03 13,175,552.52 42.00 1,618.85 2,407.79 al Temporarily [n demolished 13 1710.256915 726.8490405 1243098.598 26 1393.596943 592.298165 825424.9122 14 992.8623841 495.95184 I ] nWholly demolished O7[ [ [7 [7 [7 [7 [ [7 [7 [7 nGrade Partially demolished [7 [7 1.00 35.94 4,690.00 168,548.08 [7 [ [ lTemporarily _ _ _ _ [7 O_ demolished O 7 7 [ 7 . [7 [7 o ono | 7 OWholly demolished [[O[ [ [7 O [7 [7 n [ page 1 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) [n o n] o o o n [ n] n on n F] Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price O] Grade Partiallydemolished F El El |] o El o n | El 2 Temporarily n] __ demolished n o o o n oF] F] n] Wholly demolished O FO O O F] F] El F] F] Grade Partially demolished ] ] o F 1.00 14.03 3,510.00 49,241.74 El n o 3 Temporarily F] ______ demolished 1 6.515546679 700 4560.882676 ] 0 O r o r o O House Wholly demolished 1.00 39.74 4,800.00 190,745.57 2.00 144.44 3,470.00 501,202.36 F] F] O with Grade Partially demolished 1.00 42.92 3,330.00 142,930.26 5.00 388.74 3,381.10 1,314,379.98 1.00 34.05 4,820.00 Proper Shop 4 eprrl ty Temporarily O right demolished F] F] F] F] 1 166.548973 600 99929.38379 F] 29.25950837 500 F] Wholly demolished O O F] F] F] F] n] F] o El o El Grade Partially demolished 0 F] O] F] F]OF] F]F F] r F 5 Temporarily F] __ demolished 0] O] El _ _ _ _ F] O___ F] O O F] Wholly demolished O O O O O O 0 F] F] O O F] Grade Partially demolished O ] O F 1.00 124.53 2,850.00 354,921.02 O F F] 6 Temporarily 0] __ demolished O El El El F] F] F] F] Wholly demolished 1.00 39.74 4,800.00 190,745.57 2.00 144.44 3,470.00 501,202.36 0 El O F] subtot Partially demolished 1.00 42.92 3,330.00 142,930.26 8.00 563.24 3,350.40 1,887,090.83 1.00 34.05 4,820.00 al Temporarily F] demolished 1 6.515546679 700 4560.882676 1 166.548973 600 99929.38379 F 29.25950837 500 F] Wholly demolished O] F] F] El F] F] F] O El F] F] 0] Grade Partially demolished 2.00 752.02 5,300.00 3,985,695.12 4.00 835.02 4,039.47 3,373,034.64 F] O F] 1 Temporarily F] n_____ demolished F] 142.1543977 800 113723.5182 2 84.59542412 750 63446.56809 F] El b | ] OWholly demolished n F] F] El El F F] F] o El El | ] bGrade Partially demolished F] F] El F] O] El b] 0 F] F] O 2 Temporarily | - __,__.__eulislie -_____ _ ] - ] _-dR _B _.i e 4E F] F] F] OWholly demolished F] F] F] o n o n o n] Grade Partially demolished 3.00 547.19 3,570.00 1,953,466.86 3.00 124.48 3,280.00 408,305.41 F] F] O] page 2 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) nnF] o n] o o o] oo Fo Fo on Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily n] ______ demolished 1 85.02855372 700 59519.98761 El 129.5401075 650 84201.06991 O] El FO House Wholly demolished 1.00 26.49 3,190.00 84,510.88 4.00 161.98 3,000.00 485,952.24 O] El F] with P Grade Partially demolished 3.00 251.40 3,190.00 801,965.69 6.00 551.98 3,000.00 1,655,928.09 El O] O Proper Office - ty Temporarily O right idemolished O] 65.49442697 650 42571.37753 1 282.7106355 600 169626.3813 FO O O] 0] Wholly demolished O] [ [1 n o o F] o oL [o oo Grade Partially demolished O] O O[ El F] El O Fo o 5 Temporarily O] __ demolished O O O O O O O O n n o O] Wholly demolished 1.00 30.23 2,720.00 82,217.74 1.00 244.70 2,530.00 619,095.27 F O FO n] Grade Partially demolished O] 0 OF O] El El F FO El OO F] 6 Temporarily n] __ demolished O] El O] El D o] o] o o o] o] El Wholly demolished 2.00 56.72 2,939.53 166,728.62 5.00 406.69 2,717.20 1,105,047.51 El O O] El subtot Partially demolished 8.00 1,550.61 4,347.41 6,741,127.66 13.00 1,511.48 3,597.32 5,437,268.14 al Temporarily O] ______ demolished 1 292.6773784 737.3814966 215814.8833 3 496.8461672 638.5759623 317274.0193 O El El F] Wholly demolished 1.00 32.94 2,980.00 98,172.37 F] F F] F] F] F] o F] Grade Partially demolished 3.00 668.32 3,800.00 2,539,597.51 4.00 1,208.05 3,295.59 3,981,245.89 El O] O] Temporarily F] .demolished F 192.0194012 800 153615.521 F] 105.1000244 750 78825.0183 O _ F] F] Wholly demolished O] F] El F] F] El El F F] F] OO F] Grade Partially demolished F] El El El F] El F] F] El El El 2 Temporarily O] demolished F] F] O F] F] El F] O F] O] O] F] Wholly demolished F] F] FI F] 1.00 68.44 2,690.00 184,110.33 F] O 0 n] Grade Partially demolished 4.00 525.97 2,980.00 1,567,394.58 10.00 1,957.21 2,690.00 5,264,902.69 l O O 3 Temporarily F] demolished 1 55.0306046 700 38521.42322 3 827.302963 650 537746.926 O] O O T House F t Whrly demnUIkheI O O O O 1 106.09 2 _90.00 274,761.98 O - --- -- with nPrWornehr Y-.y Grade Partially demolished 2.00 141.00 2,780.00 391,971.02 6.00 762.04 2,590.00 1,973,680.34 1.00 198.59 2,350.00 page 3 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) Frame structure Composite structure Brick and timber struct b______ ld_____________ 4quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price - u ulUl 1 7 Temporarily ty right ng demolished 1 52.72481751 650 34271.13138 1 166.4736555 600 99884.19328 F] 80.51289809 500 F] Wholly demolished [1 [1 O F] o] o o] on n] Grade Partially demolished El El o] o] F] o] no 5 Temporarily n] demolished O n o n o n o r o o o n] Wholly demolished El F] F F FO FO O F] O O El Grade Partially demolished 1.00 53.58 2,400.00 128,599.54 5.00 1,234.34 2,200.00 2,715,541.03 F] 6 Temporarily n] demolished O ] O F 1 245.1829596 500 122591.4798 O El O n] Wholly demolished 1.00 32.94 2,980.00 98,172.37 2.00 174.53 2,629.22 458,872.31 F] F] O F] subtot Partially demolished 10.00 1,388.87 3,331.90 4,627,562.65 25.00 5,161.64 2,699.79 13,935,369.% 1.00 198.59 2,350.00 al Temporarily F] ______ demolished 2 299.7748233 755.2604754 226408.0756 5 1344.059602 624.2636977 839047.6173 F] 80.51289809 500 F] Wholly demolished El F F] F] F] F] F F] F] F] F] F] Grade Partially demolished 3.00 585.28 3,800.00 2,224,047.97 1.00 39.37 3,510.00 138,182.98 F] n o 1 Temporarily O] demolished F] 91.46996188 800 73175.96951 1 68.52431238 750 51393.23428 O F] O F] Wholly demolished F F] FF F] F] F F El F] F F] Grade Partially demolished F] F] FF F F FF El F] F] 2 Temporarily n] demolished C] F] F El F F] F El F] F] Wholly demolished O F] El F] O] O O F] F] LI Grade Partially demolished n o o o o o o n o o o 3 Temporarily F] demolished O O 1 74.08595479 650 48155.87061 F] F F F]House Wholly demolished [ F] F F] F F] o F] F] o F] n Proper Other Grade Partially demolished O OF 1.00 87.02 2,590.00 225,374.19 F] F ty uses 4 Temporarily n right demolished O El O F] 138.943687 600 83366.21218 O El F] F] _ ____ - Wholly demolished O n o-F o o o o_ n] Grade Partiallydemolished El o o_ o_ o_ o_ n_oo page 4 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) nFl n ] o ] U] n n] ]U El c] o] o] n] no Frame structure | Composite structure Brick and timber strucl quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily n] demolished 0 n o o o o U o o o o U] Whollydemolished U] O] U U] U] El U El U] o] U] n] Grade Partially demolished U C U ° U]0 U] U] 0 l O 0 0 6 Temporarily n] demolished O U] O O O O 0 O 0 0 O U] Wholly demolished 0 U] U] O U] U] U] U] U] 0 U] U] subtot Partially demolished 3.00 585.28 3,800.00 2,224,047.97 2.00 126.39 2,876.57 363,557.17 El U] U] al Temporarily O] _demolished U 91.46996188 800 73175.96951 2 281.5539541 649.6634638 182915.3171 U] 0 n U] Wholly demolished 1.00 32.94 2,980.00 98,172.37 U] O 0 U] 3.00 197.36 3,110.00 U] Grade Partially demolished 12.00 3,173.39 4,046.71 12,841,792.77 19.00 3,165.40 3,541.55 11,210,404.15 14.00 440.33 3,110.00 1 Temporarily U] ______ demolished 1 1392.349627 800 1113879.702 6 508.200973 750 381150.7298 1 245.3051724 650 0] Wholly demolished El U] U] ] 0 U] 0 U] U] U] U El Grade Partially demolished U U U U] U U U] El El U 0 2 Temporarily U] __ demolished O 0 O] O El O U] El 0 U] Wholly demolished E 0 0U U] 1.00 68.44 2,690.00 184,110.33 1.00 20.70 2,310.00 n] . Grade Partially demolished 12.00 2,395.17 3,059.59 7,328,248.55 25.00 2,848.86 2,696.03 7,680,602.09 9.00 436.33 2,310.00 3 Temporarily El demolished 7 498.6412736 700 349048.8915 8 1222.300907 650 794495.5897 4 185.9427242 550 n House Wholly demolished 5.00 197.26 3,182.23 627,711.48 9.00 653.24 2,853.08 1,863,744.58 U] U] U pwer total Grade Partially demolished 14.00 1,192.16 2,829.12 3,372,780.15 37.00 3,167.99 2,719.36 8,614,908.59 11.00 477.05 2,485.33 ty 4 Temporarily right demolished 3 197.9276699 650 128652.9854 9 1128.930504 600 677358.3022 4 170.2651149 500 El Wholly demolished El O U] U] El U] U] U] U] o] U] U] Grade Partially demolished U] 0U] 0 0 U] I O El O O 5 Temporarily U] . _ demolished n _ oI_LI o_ o o oooo ] ____ Wholly demolished 5.00 838.09 2,324.79 ,948,379.94 - 22.00 2,058.52 2,1.55 4,482,522.12 13.00 610.52 1,940.00 U] Grade Partially demolished 16.00 2,588.25 2,311.86 5,983,672.44 33.00 3,341.25 2,182.70 7,292,923.77 10.00 497.78 1,940.00 page 5 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) nol F] n] E nl nE n nl n o on Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price 6 Temporarily nl demolished 6 311.7760546 550 171476.83 14 823.1732562 500 411586.6281 5 501.121779 400 Ol Wholly demolished 11.00 1,068.29 2,503.32 2,674,263.79 32.00 2,780.20 2,348.89 6,530,377.02 17.00 828.58 2,227.92 Ol subtot Partially demolished 54.00 9,348.97 3,158.26 29,526,493.91 114.00 12,523.50 2,778.68 34,798,838.61 44.00 1,851.49 2,445.96 al Temporarily El ______ ______ demolished 17 2400.694625 734.3951164 1763058.409 37 3682.60564 614.9426442 2264591.25 14 1102.634791 496.3548531 El Wholly demolished El E E El 1.00 283.70 2,550.00 723,441.37 El El E El Grade Partially demolished El E El E 1.00 28.39 2,550.00 72,402.98 1.00 21.36 2,350.00 1 Temporarily El ______ demolished l l l E E 34.84917521 750 26136.88141 El 36.61354959 650 El1 Wholly demolished El El El El El El El El El Grade Partially demolished E El E l l El El E E E 2 Temporarily El demolished E l E l l l l El El E E Ol .Wholly demolished 6.00 2,439.78 2,550.00 6,221,436.16 6.00 355.84 2,350.00 836,218.13 El El E El Grade Partially demolished 16.00 3,266.74 2,550.00 8,330,194.85 4.00 523.60 2,350.00 1,230,456.22 1.00 92.51 2,150.00 3 Temporarily El demolished 7 2710.107377 700 1897075.164 1 307.5097747 650 199881.3535 El 28.58414495 550 l house Wholly demolished 37.00 10,260.89 2,450.00 25,139,169.03 14.00 1,228.55 2,250.00 2,764,239.59 2.00 173.10 2,050.00 on ______,____ OE reside Housin Grade Partially demolished 94.00 16,461.03 2,450.00 40,329,521.17 19.00 1,897.82 2,250.00 4,270,094.08 2.00 25.72 2,050.00 ntial g 4 Temporarily O plot demolished 15 7979.612224 650 5186747.946 2 640.1406864 600 384084.4118 1 51.87303936 500 El Wholly demolished El El El El E E El E El 0 El El Grade Partially demolished El El E 0 El El E El 0 E 5 Temporarily El __ demolished E El E El l El El El El E E El Wholly demolished 19.00 3,134.64 2,250.00 7,052,938.06 2.00 273.28 2,050.00 560,230.28 l E E El Grade Partially demolished 19.00 2,601.25 2,250.00 5,852,811.26 5.00 431.78 2,050.00 885,153.56 1.00 10.84 1,850.00 6 Temporarily Ol demolished 11 594.6472217 550 327055.9719 El 193.122683 500 96561.34152 1 35.86460388 400 Ol Wholly demolished 62.00 15,835.30 2,425.82 38,413,543.25 23.00 2,141.37 I2,280.84 4.844.829-.m6 2 (N0 173.0 2,050.00O El subtot Partially demolished 129.00 22,329.02 2,441.33 54,512,527.28 29.00 2,881.59 2,241.16 6,458,106.84 5.00 150.42 2,139.68 page 6 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) __ n_ __ n__o_r__ _ n_o_ o n o n ni o n Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price a' Temporarily O ______ demolished 33 11284.36682 656.7385834 7410879.082 3 1175.622319 601.0977987 706663.9883 2 152.9353378 521.8051586 O Wholly demolished n U U U U U o o o o o Grade Partially demolished O U O O n o o o o n o 1 Temporarily O demolished U U U U U U U U U U U U Wholly demolished U U 0 U n U U U U U U n Grade Partially demolished U U U U 0 U O U U U 0 2 Temporarily U demolished U U U U U U U U U U U U . Wholly demolished 2.00 668.16 2,550.00 1,703,802.62 U U U U 1.00 56.20 2,150.00 U Grade Partially demolished U . U U U U U U U U U U 3 Temporarily U . _____ demolished 1 9.335017562 700 6534.512293 U U U U 1 27.12259763 550 U house Wholly demolished 6.00 241.68 2,450.00 592,109.91 5.00 124.16 2,250.00 279,351.46 U U U resoinde Shop Grade Partially demolished 25.00 1,786.06 2,450.00 4,375,857.98 2.00 199.46 2,250.00 448,778.86 1.00 604.29 2,050.00 ntial 4 Temporarily plot demolished U 908.7914031 650 590714.412 U 80.93262517 600 48559.5751 U 231.6366189 500 U Wholly demolished U U U U U U U U U U U U Grade Partially demolished U U U 0 U U U U U U U 5 Temporarily U __ demolished U U U U U U U U U U U U Wholly demolished 5.00 623.39 2,250.00 1,402,632.46 1.00 145.81 2,050.00 298,909.47 U U U U Grade Partially demolished 2.00 179.55 2,250.00 403,991.43 2.00 183.47 2,050.00 376,109.84 1.00 32.02 1,850.00 6 Temporarily UO demolished U 42.53982496 550 23396.90373 U 298.3297434 500 149164.8717 U U U U Wholly demolished 13.00 1,533.23 2,412.26 3,698,544.99 6.00 269.97 2,141.98 578,260.93 1.00 56.20 2,150.00 U subtot Partially demolished 27.00 1,965.62 2,431.73 4,779,849.41 4.00 382.93 2,154.18 824,888.71 2.00 636.31 2,039.93 al Temporarily U demolished 1 960.6662456 646.057703 620645.828 U 379.2623686 521.3394821 197724.4468 1 258.7592165 505.240895 U _____ Wholly demolished U ElO__ O fl O - - n-- --o - - U _ Grade Partially demolished UO U o Uo U U U U U U page 7 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicaIlI municipal for Datansha project (pipe network) Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily [7 demolished [[ [ [O El O El [O Wholly demolished 77 7 7 O7 [7 [7 Grade Partially demolished [7 [[ [ [ o7 2 Temporarily [7 demolished [ [ [ [ [ [ [ [ [ [ [ [7 Wholly demolished O [7 [7 [7 0 [7 7 [7 O E7 [7 [7 Grade Partially demolished 2.00 264.17 2,550.00 673,633.47 [7 [7 [O [O [ [ 7 3 Temporarily O7 demolished [ 290.1944226 700 203136.0958 1 16.52320969 650 10740.0863 O7 O7 [7 n house Wholly demolished [ [ [7 [7 [ [7 [7 [ 7 [ [ on O reside Office Grade Partially demolished 3.00 437.46 2,450.00 1,071,772.75 [ ntial . 4 Temporarily plot demolished [ 108.7760875 650 70704.45689 7 [ 7 7 7 [ [ [ Wholly demolished [7 [ [ [ 0 [7 [7 7 [ [ [ [ Grade Partially demolished [ [7 [7 [ [7 [7 [ [7 [7 [7 o7 5 Temporarily O demolished [7 [7 [l [ [7 [7 [ [ [ [ [7 O Wholly demolished [[ [ 0 1.00 607.35 2,050.00 1,245,073.83 [7 [ O7 Grade Partially demolished [ [ [ [ [ [ 7 [7 [ [ [ 6 Temporarily [7 __ demolished [n[El [ o o o oo [7 Wholly demolished 0 7 7 o 1.00 607.35 2,050.00 1,245,073.83 [7 [7 [7 [7 subtot Partially demolished 5.00 701.63 2,487.65 1,745,406.22 [7 [7 [7 [7 [7 0 [[ al Temporarily [7 ______ ______ demolished [7 398.9705101 686.3679038 273840.5527 1 16.52320969 650 10740.0863 [7 [ [7 [7 Wholly demolished 0 [7 [7 [7 [ 0 [7 0 [O [O [ [7 Grade Partially demolished [7 [ [7 [ [7 [7 1 Temporarily O7 demolished [O [l [ [O O_ El [7 [ O O __ n n7 Wholly demolished [O [7 O7 [7 [7 n1 [ _44 .7 n7 Grade Partially demolished [[[ n [7 [l [7 [7 7 [ page 8 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall3 municipal for Datansha project (pipe network) on Fn o n E n o Fn Fn F] n El n F] Frame structure Com osite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily n] __ demolished n] o El o] o] o] o] o] o o o O] .Whollydemolished 1.00 358.01 2,550.00 912,931.87 F] 0] F] ° El °O Grade Partially demolished 2.00 875.74 2,550.00 2,233,126.57 1.00 311.99 2,350.00 733,170.12 O O 0 3 Temporarily n] ______ demolished 0] O] 0 OF El 127.8145072 650 83079.42971 n o o F] house Foctor Wholly demolished F] F] 0 OF 2.00 203.20 2,250.00 457,202.93 0 0 0 Oreside y Grade Partially demolished 7.00 1,620.99 2,450.00 3,971,432.68 3.00 356.25 2,250.00 801,560.57 2.00 646.93 2,050.00 ntial buildi 4 Temporarily plot ng idemolished F 463.7830986 650 301459.0141 F] 44.2965157 600 26577.90942 F] 290.5769008 500 F] Wholly demolished 0] 0 O] F0 0 El F] F] F] F] 0 F] Grade Partially demolished n o o o o o o o o o o 5 Temporarily F] __ demolished El 0] 0] F] F] El O] El E ] 0 F] Whollydemolished 0 F0 0 F F F ] 0 0 F F n F] Grade Partially demolished 3.00 1,171.59 2,250.00 2,636,066.99 1.00 235.06 2,050.00 481,863.87 3.00 761.86 1,850.00 6 Temporarily O] ______ demolished 0 368.5798556 550 202718.9206 F] 57.33367538 500 28666.83769 F 248.94259 400 F] Wholly demolished 1.00 358.01 2,550.00 912,931.87 2.00 203.20 2,250.00 457,202.93 0] O F] F] subtot Partially demolished 12.00 3,668.31 2,410.00 8,840,626.23 5.00 903.29 2,232.49 2,016,594.56 5.00 1,408.79 1,941.84 al Temporarily 0] ._____ ______ demolished F] 832.3629541 605.7188539 504177.9346 F] 229.4446983 602.8649946 138324.1768 F 539.5194908 453.8584622 F] Wholly demolished F] 0 F] F] El F] F F] F]I F] o F] Grade Partially demolished F] F° O] F] F] F] F] F] F] O F] 1 Temporarily 0_ demolished F] F] . El O F] F] n F] o El O] Wholly demolished F] O F] F] F F] El F] F] oo F] F] Grade Partially demolished F] O OF F] O O F] o 2 Temporarily F] __ demolished r o o o oF] Fo o o F] Wholly demolished n_ - --l -F] o o- o_-_ F] Grade Partiallydemolished 0 n n] F F] F] F] F] El o page 9 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) Frame structure Composite structure Brick and timber struct _ _____ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily [n __ demolished [O [O [ [O [ [l [O [ [ El [ house Wholly demolished [a [a [a [[ [ [a [a oa [ [a reside Other Grade Partially demolished 1.00 322.18 2,450.00 789,347.10 [ [a [a [a 1.00 173.79 2,050.00 ntial uses 4 Temporarily n plot demolished a 2.951784134 650 1918.659687 [a [a [a [a [a 73.92574143 500 Oa Wholly demolished a [a [ [a [a [a [ [a [a [a 0 Oa Grade Partially demolished [ [ [ [ [ [ [ [ [ [ [ 5 Temporarily Oa __ demolished a l [ [ [ [ [ [ [a [a O Ea Wholly demolished [a [a [a Oa [a [a na Grade Partially demolished [a [a [a [a 0 [a [ [ [a 6 Temporarily [O demolished [a [O [O [O [a [a [ [ [n Whollydemolished [ a a [a [a [a 0[ [ [a subtot Partially demolished 1.00 322.18 2,450.00 789,347.10 0a [a [a 0 1.00 173.79 2,050.00 al Temporarily [a ______ ______ ______ demolished [a 2.951784134 650 1918.659687 [a 0 0 [a[ [a 73.92574143 500 [a Wholly demolished 0 [ [ [a 1.00 283.70 2,550.00 723,441.37 [a 0 0 [a Grade Partially demolished [ [a [a [a 1.00 28.39 2,550.00 72,402.98 1.00 21.36 2,350.00 1 Temporarily [a ______ demolished [a [a [a [a [a 34.84917521 750 26136.88141 [a 36.61354959 650 [a Wholly demolished [ [ [ [a [a [a [a [a Ea [a [a Grade Partially demolished [[ [a [a [a [a [a [a [a [ [ 2 Temporarily [n __ demolished [ a a a [a [a [a [a [ [ [a Wholly demolished 9.00 3,465.95 2,550.00 8,838,170.66 6.00 355.84 2,350.00 836,218.13 1.00 56.20 2,150.00 [a Grade Partially demolished 20.00 4,406.65 2,550.00 11,236,954.89 5.00 835.59 2,350.00 1,963,626.33 1.00 92.51 2,150.00 3 Temporarily Oa _____ demolished 8 3009.636817 700 2106745.772 2 451.8474916 650 293700.8696 1 55.70674258 550 Elhouse lWholly demolished ~43J00 10.502S56 2,45ff00 -2,- - 2L0Q- -4555~-9- -2,250.00-35O9-7 -2-0 -473410- - 2-050.OG1 n res°inde total Grade Partially demolished 130.00 20,627.73 2,450.00 50,537,931.68 24.00 2,453.53 2,250.00 5,520,433.51 6 100 1,450.73 2,050.00 page 10 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall] municipal for Datansha project (pipe network) Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price ntial 4 Temporarily n plot Idemolished 15 9463.914598 650 6151544.488 2 765.3698273 600 459221.8964 1 648.0123005 500 n7 Wholly demolished [7 o [ [ [7 [7 [l [n [o [7 o] Grade Partially demolished [7 [O [ [7 [7 [l [7 n [ [7 [7 5 Temporarily [n demolished [n [7 [7 [o [7 [7 [7 [o [ [ [o [7 Wholly demolished 24.00 3,758.03 2,250.00 8,455,57052 4.00 1,026.45 2,050.00 2,104,213.58 [7 [7 0 [7 Grade Partially demolished 24.00 3,952.39 2,250.00 8,892,869.69 8.00 850.31 2,050.00 1,743,127.28 5.00 804.72 1,850.00 6 Temporarily [O demolished 11 1005.766902 550 553171.7962 [ 548.7861018 500 274393.0509 1 284.8071939 400 [7 Wholly demolished 76.00 17,726.54 2,427.15 43,025,020.12 32.00 3,221.89 2,223.74 7,164,667.05 3.00 229.31 2,074.51 [7 subtot Partially demolished 174.00 28,986.76 2,437.93 70,667,756.25 38.00 4,167.81 2,231.29 9,299,590.11 13.00 2,369.32 1,988.68 al Temporarily [7 ______ ______ ______ demolished 34 13479.31832 653.7023497 8811462.057 4 1800.852596 584.9744175 1053452.698 3 1025.139787 480.2921025 [7 Wholly demolished 4.00 80.57 800.00 64,459.00 3.00 205.37 750.00 154,028.44 E7 [ [7 [0 Grade Partially demolished 1.00 17.47 800.00 13,975.13 9.00 460.52 750.00 345,386.59 4.00 386.19 650.00 1 Temporarily [n demolished 3 21.26112795 800 17008.90236 4 193.3532406 750 145014.9305 [7 172.4856622 650 [ Wholly demolished [7 [7O[ [ [7 [ 0 [7 [7 [ [ [7 Grade Partially demolished 7 [ [ [ [ [7 n [o o7 [7 [ 2 Temporarily [7 demolished [n [ [ [ [ [ 7 [ [ [ [7 [ Wholly demolished 1.00 4.75 700.00 3,325.46 3.00 100.37 650.00 65,242.97 0 [ [7 [7 Grade Partially demolished 1.00 558.46 700.00 390,923.41 1.00 50.88 650.00 33,070.68 10.00 472.91 550.00 3 Temporarily n7 demolished [7 157.9662999 700 110576.4099 5 75.7767036 650 49254.85734 3 178.394606 550 O7 histor Wholly demolished [7 [7 0 [[ 9.00 419.72 600.00 251,832.37 2.00 435.17 500.00 O ically Housin Grade Partially demolished 12.00 2,182.74 650.00 1,418,779.57 17.00 644.72 600.00 386,834.06 10.00 607.55 500.00 used g 4 Temporarily n house demolished 2 943.4076235 650 613214.9553 4 319.1957268 600 191517.4361 2 351.0870063 500 n -_ _ _ Wholly demolished O O O[ -[ O -[ 0 -[ 0 -[ 0 -[ O 0 ____0 _____ I 7 r l |Grade Partiallydemolished 7 [ [ 7 [ [ [ [ E7 [71 [ page 1 Iof 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicalll municipal for Datansha project (pipe network) n] n nl o oLi on En o nl o Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily Ol __Idemolished O O O ] O O O O O O n 0l Wholly demolished 7.00 424.91 550.00 233,700.53 5.00 199.07 500.00 99,536.50 E0 0 Ol nl Grade Partially demolished 4.00 574.99 550.00 316,246.62 10.00 787.21 500.00 393,604.72 7.00 1,186.60 400.00 6 Temporarily El ______ demolished E 5.19155395 550 2855.354673 12 167.6067873 500 83803.39366 1 406.5253824 400 El Wholly demolished 12.00 510.23 590.88 301,484.99 20.00 924.54 617.22 570,640.28 2.00 435.17 500.00 El subtot Partially demolished 18.00 3,333.66 641.91 2,139,924.73 37.00 1,943.33 596.35 1,158,896.05 31.00 2,653.25 486.02 al Temporarily El ______ ______ demolished 5 1127.826605 659.3705262 743655.6222 25 755.9324583 621.2071097 469590.6175 6 1108.492657 494.7135792 El Wholly demolished E E El E El E 0 El E El El El Grade Partially demolished O El El El El El E El El 0 El 1 Temporarily ElO demolished E El l El El El E El El E E El Wholly demolished El El El El E 0 E E El El El El Grade Partially demolished E El El El 2 Temporarily El __ demolished E E E E E E E E E E E El Wholly demolished 0 E El El 1.00 8.93 650.00 5,807.75 El E El nl Grade Partially demolished 0 E E E 2.00 309.24 650.00 201,007.47 1.00 95.55 550.00 3 Temporarily E demolished El El El El El 143.9078422 650 93540.0974 El 23.09047598 550 El histor Wholly demolished 1.00 270.63 650.00 175,906.72 El El E El 1.00 289.26 500.00 El ically Shop Grade Partially demolished 8.00 1,284.02 650.00 834,614.09 8.00 995.96 600.00 597,573.33 8.00 708.67 500.00 used 4 Temporarily El house demolished El 580.7718737 650 377501.7179 El 313.6050217 600 188163.013 1 272.1826146 500 O Wholly demolished E El El E El El El EE El E El Grade Partially demolished EEl El E 0 El El El 5 Temporarily El O_ demolished El El El El El El E E El _ _ _Wholly demolished 2-0)0l 149 62 550n00 £ 2,29 70 -400 90628 500.00 4531lI39.78 O- _ El nGrade Partially demolished 6.00 1,321.96 550.00 727,077.31 5.00 714.64 500.00 357,322.28 E E E page 12 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall] municipal for Datansha project (pipe network) nU El n n n n n oL n o] o n o n Frame structure Composite structure Brick and timber struci 6_____ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily O ______ demolished n 55.84423602 550 30714.32981 n 98.13672006 500 49068.36003 nI o o n Wholly demolished 3.00 420.25 614.40 258,200.42 5.00 915.21 501.46 458,947.53 1.00 289.26 500.00 n] . subtot Partially demolished 14.00 2,605.98 599.27 1,561,691.40 15.00 2,019.84 572.27 1,155,903.08 9.00 804.21 505.94 al Temporarily O] _______ ______ ______ demolished [J 636.6161097 641.2279575 408216.0477 U 555.6495839 595.2878937 330771.4705 1 295.2730905 503.9100204 O Wholly demolished [O OU ElO I U n o o °o O Grade Partially demolished O O [ U 1.00 76.54 750.00 57,406.30 1.00 57.27 650.00 1 Temporarily n ______ demolished O O O U OL 15.13274336 750 11349.55752 O 32.17713976 650 n Wholly demolished E E U U U U U U U U O O Grade Partially demolished U U U U U U U U U U U 2 Temporarily U __ demolished U O U U U U U U U U o Wholly demolished U U O U U U U U U O U U Grade Partially demolished 1.00 15.88 700.00 11,113.60 3.00 62.94 650.00 40,912.94 U U U 3 Temporarily O demolished U U U U 1 23.42575264 650 15226.73922 U U U U histor Wholly demolished 1.00 289.04 650.00 187,875.35 6.00 69.39 600.00 41,635.89 U U] U U ically Office Grade Partially demolished 3.00 583.60 650.00 379,336.84 6.00 120.45 600.00 72,271.90 1.00 112.77 500.00 used 4 Temporarily U house demolished U 2443620231 650 158835.315 2 36.22274864 600 21733.64918 U U U n Wholly demolished U U U U U U U U U 0 U U Grade Partially demolished U U U U U U U U U U 5 Temporarily U demolished UO U U U U U U U U U U Wholly demolished 1.00 60.05 550.00 33,026.64 8.00 176.11 500.00 88,055.95 U U U U Grade Partially demolished U U U U U U U U U U 1U 6 Temporarily U demolished U o U U U U U U U U U U ____ Wholly demolished 1 2-00 349 09. A632 0 8n220,901.99 14 00 1245.51 528.27 129,691.84 °- - ---E} - U subtot Partially demolished 4.00 599.47 651.32 390,450.44 10.00 259.94 656.28 170,591.14 2.00 170.04 550.52 page 13 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall3 municipal for Datansha project (pipe network) ElE El El E [ l FElE El El El El El El Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price a' Temporarily El ______ demolished El 244.3620231 650 158835.315 3 74.78124464 646.0168743 48309.94592 E 32.17713976 650 Wholly demolished L El El ol 4.00 112.64 750.00 84,479.42 E El El El Grade Partially demolished El El El El 1.00 18.72 750.00 14,038.97 5.00 691.39 650.00 1 Temporarily El demolished El El El 451.0912268 650 El Wholly demolished El El El E 0 E E El El El El Grade Partially demolished El l. E El El El El El El El E 2 Temporarily El demolished l l E E E E E E E E E El Wholly demolished El El El El El El El El E E El El Grade Partially demolished 2.00 182.99 700.00 128,093.16 2.00 222.54 650.00 144,652.75 5.00 486.93 550.00 3 Temporarily El .demolished E E E El 1 70.12614822 650 45581.99635 1 126.9853635 550 E histor Foctor Wholly demolished 2.00 155.55 650.00 101,107.96 El El El El El El E E ically y Grade Partially demolished 17.00 4,088.87 650.00 2,657,766.95 15.00 2,791.46 600.00 1,674,877.72 6.00 858.12 500.00 used buildi 4 Temporarily E house ng demolished 1 1794.75209 650 1166588.859 2 937.0387655 600 562223.2593 1 250.68695 500 El Wholly demolished El El El E E El El El El El El El Grade Partially demolished El El E El El El El El El El El 5 Temporarily El __ demolished E El E El El E El El E El Wholly demolished El El El E 1.00 41.28 500.00 20,637.80 l El El El Grade Partially demolished 1.00 93.79 550.00 51,587.19 2.00 113.20 500.00 56,600.33 11.00 1,515.34 400.00 6 Temporarily En demolished E 37.5172379 550 20634.48085 El 48.0389899 500 24019.49495 E 627.95918 400 El Wholly demolished 2.00 155.55 650.00 101,107.96 5.00 153.91 682.96 105,117.22 El El El El subtot Partially demolished 20.00 4,365.66 649.95 2,837,447.31 20.00 3,145.92 600.83 1,890,169.77 27.00 3,551.78 493.39 al Temporarily El ______ ______ ______ demolished 1 1832.269328 647.9524169 1187223.34 3 1055.203904 598.770293 631824.7506 2 1456.72272 507.7001848 El -- __- ____ Whollv demolished - -- - --- -- -El E Grade Partially demolished OE El E 0 1.00 433.89 750.00 325,414.63 E E E page 14 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallb municipal for Datansha project (pipe network) nH b b n o H o o H HH H Frame structure | Composite structure Brick and timber struct 1_____ ________________ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily n demolished H H H H H 103.1742383 750 77380.67874 O H H H Wholly demolished 0 H H H H H H H H H H H Grade Partially demolished H H H H H H H H H H H 2 Temporarily H __ demolished H H H H H H H H H H H H Wholly demolished 1.00 57.69 700.00 40,383.00 4.00 157.01 650.00 102,055.69 1.00 35.75 550.00 H Grade Partially demolished H H H H 5.00 95.64 650.00 62,167.99 H H H 3 Temporarily H ______ demolished H H H H H 61.20084625 650 39780.55007 H H H H histor Wholly demolished 2.00 98.59 650.00 64,084.11 11.00 457.64 600.00 274,581.68 H H ically Other Grade Partially demolished 3.00 170.65 650.00 110,922.25 13.00 529.54 600.00 317,726.65 H used uses 4 Temporarily H house demolished H 43.53392947 650 28297.05415 1 299.259145 600 179555.487 H H H H Wholly demolished H 0 H H H H H H H H H H Grade Partially demolished H H H Hl 0 H H H H 5 Temporarily H __ demolished H H H H H H H H H H H H Wholly demolished 2.00 251.18 550.00 138,147.51 2.00 22.79 500.00 11,396.60 H H H H Grade Partially demolished 1.00 33.65 550.00 18,506.49 5.00 161.54 500.00 80,769.11 H H 0 6 Temporarily H ______ demolished H 16.68408537 550 9176.246953 H 12.98587334 500 6492.936671 H H H H Wholly demolished 5.00 407.46 595.43 242,614.63 17.00 637.44 608.74 388,033.97 1.00 35.75 550.00 H . subtot Partially demolished 4.00 204.30 633.53 129,428.74 24.00 1,220.61 644.00 786,078.38 H H H al Temporarily H ______ ______ demolished H 60.21801484 622.2938635 37473.30111 1 476.6201029 636.1663107 303209.6525 H H H H Wholly demolished 4.00 80.57 800.00 64,459.00 7.00 318.01 750.00 238,507.86 H H H H Grade Partially demolished 1.00 17.47 800.00 13,975.13 12.00 989.66 750.00 742,246.49 10.00 1,134.85 650.00 1 Temporarily H ______ ~~~~demolished 3 21.26112795 800 17008.90236 4 311.6602223 750 233745.1667 H1 655.7540287 650 E I Wholly demolished O - O O n - - - - - - o _ H Grade Partially demolished H H H H H H H H H H H page 15 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) nnE] F] F] o] E F] n] ElF F] o] o LI oo Frame structure Composite structure Brick and timber struct Z _______________ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily O_ demolished n o n o] o] El n] o o] o o n Wholly demolished 2.00 62.44 700.00 43,708.46 8.00 266.32 650.00 173,106.41 1.00 35.75 550.00 O Grade Partially demolished 4.00 757.33 700.00 530,130.17 13.00 741.25 650.00 481,811.83 16.00 1,055.39 550.00 3 Temporarily F] demolished F] 157.9662999 700 110576.4099 7 374.4372929 650 243384.2404 4 328.4704455 550 F] histor Wholly demolished 6.00 813.81 650.00 528,974.14 26.00 946.75 600.00 568,049.94 3.00 724.43 500.00 ically total Grade Partially demolished 43.00 8,309.88 650.00 5,401,419.71 59.00 5,082.14 600.00 3,049,283.66 25.00 2,287.10 500.00 used 4 Temporarily O house demolished 3 3606.82754 650 2344437.901 9 1905.321408 600 1143192.845 4 873.9565709 500 F] Wholly demolished O F ] 0 OF F] F] O F] ] F] I 0 F] Grade Partially demolished F] O F] F] El F] F] n F] o o 5 Temporarily O] demolished El F F F F F F F F E F] Wholly demolished 12.00 885.76 550.00 487,168.38 20.00 1,345.53 500.00 672,766.63 F] F] F] O] Grade Partially demolished 12.00 2,024.40 550.00 1,113,417.61 22.00 1,776.59 500.00 888,296.45 18.00 2,701.94 400.00 6 Temporarily F] demolished F] 115.2371132 550 63380.41228 12 326.7683706 500 163384.1853 1 1034.484562 400 O] Wholly demolished 24.00 1,842.58 610.18 1,124,309.97 61.00 2,876.61 574.44 1,652,430.84 4.00 760.18 502.35 F] subtot Partially demolished 60.00 11,109.07 635.42 7,058,942.62 106.00 8,589.64 600.91 5,161,638.43 69.00 7,179.27 493.43 al Temporarily F] ______ demolished 6 3901.292081 649.8881839 2535403.626 32 2918.187293 611.2378191 1783706.437 9 2892.665607 503.919627 F] Wholly demolished F] 0] O F] O F] O] F] F] El F] F] Grade Partially demolished 2.00 335.03 El O ] n F] ] ] o o 1 Temporarily n_ demolished F] 111.51442 800 89211.53603 ] O ] ] ] O O F] Wholly demolished O El F] F] F] F] O O F] F] 0 F] Grade Partially demolished OF F] F] ] F] E] F] ] o] oF 2 Temporarily FO demolished F FO El o _ o o o El o o] F] _ ____ Wholly demolished F C! O _ P n o n - _ _ F] Grade Partially demolished 3.00 125.69 F] F] F] F] F] F] 7.00 194.55 O page 16 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) nFl G i ni r i ii El El GI O O El r nl Frame structure | Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily r Tempor demolished El r n] o r r r n o n ary tWholly demolished ni r o o oi El oL o 3.00 58.77 Oi El uruec Housin Grade Partially demolished 8.00 961.71 O oi 1.00 283.75 ri ri 1.00 19.93 O before g 4 Temporarily Li expira demolished 1 201.4221727 650 130924.4122 n 157.9178429 600 94750.70572 1 11.76578188 500 ni tion Wholly demolished 0 o o r r o r o o o o Grade Partially demolished i l o r r r o o o o L 5 Temporarily Li demolished El r Li Li o Li L o Li Li r Li Wholly demolished r o Li Li Li Li Li Li Li Li Li Li Grade Partially demolished 7.00 956.34 Li Li Li r Li Li 2.00 44.26 Li 6 Temporarily Li demolished L 169.4554253 550 93200.48389 i n c n L 15.02347982 400 Gi Wholly demolished r El o Li Li Li Li o 3.00 58.77 n El subtot Partially demolished 20.00 2,378.77 Li r 1.00 283.75 Li Li 10.00 258.75 0 al Temporarily Li ______ demolished 1 482.392018 649.5472986 313336.4322 Li 157.9178429 600 94750.70572 1 26.7892617 443.9197691 El Wholly demolished Li r o o o Li Li Li Li El o El Grade Partially demolished O Li r El Li El Li i 1 .00 9.25 0 1 Temporarily Li demolished r Li Li Li Li 6.513449728 650 nL Wholly demolished O O Li O Li Li El 0 Li [L Grade Partially demolished O nL o Li Li o o Li Li Fl o 2 Temporarily 0i demolished Oi Li El Li oi o El Li o Li Li Li _ Wholly demolished El Li O El Li Li Li O O Li O Grade Partially demolished O Li OL El Li O Li Li Li 3 Temporarily nTempor demolished Oi Li Li Li Li O Li Li Li l:3 ary _ Whnlly df'mnli'shed O O OO_1._00 2I77.80 O O - 00 1624.39 _ _ _ struect ShoD Grade Partially demolished 3.00 657.14 O L 3.00 98.03 n n 3.00 185.75 0 page 17 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall] municipal for Datansha project (pipe network) F]F] F] F] F] ~~ ~ ~~ ~ ~~~F] F] F]I F]F F] F] F] F] F] Frame structure Composite structure Brick and timber struci quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price before ^ 4 Temporarily 0 expira demolished 0 180.096568 650 117062.7692 O 31.59050763 600 18954.30458 O 56.24729252 500 O tion Wholly demolished O] F] FO ElOF O O] O O FO O Grade Partially demolished O]i F] F F] F F] F] F F] F F] 5 Temporarily 0] __ demolished n o o o o o o o o o o O] Wholly demolished OF El O O O O] O] El O] O n] Grade Partially demolished ] O ] ] ] ] F 6 Temporarily F] demolished O O O O O 0 O O 0 O 0 F] Wholly demolished F F] F 1.00 277.80 0 F] 2.00 624.39 F] O] subtot Partially demolished 3.00 657.14 F F] 3.00 98.03 [L F 4.00 195.00 0 al Temporarily F] ______ demolished O 180.096568 650 117062.7692 F] 31.59050763 600 18954.30458 F 62.76074225 515.5673344 O Wholly demolished F] O O] F] F] El O O O] O] F] F] Grade Partially demolished O ] ] ] ] ] O ] ] O O 1 Temporarily O] demolished 0 0 O O 0 O O O O 0 O F] Wholly demolished O O] O El O] O O O El O] O] F] Grade Partially demolished O El O F] F] F] O F] F] F] 2 Temporarily 0] __ demolished O O 0 O n o o o o o o F] Wholly demolished O O O O O O O O O O O FO Grade Partially demolished F] F] El F F] F] El F] O O F] 3 Temporarily n]Tempor demolished O ] F] O 0 ] O F F] F O ary Wholly demolished O F] F] El O El OF F] O El struct O Grade Partially demolished O O O O 1.00 29.56 0 O O 0 0 11ure Office E .0 2561 l before 4 Temporarily O expira demolished F] O] O] O E O ] O O O F O] tion Wholly demolished F] O ] [ F] n n o _ _ -- __I F] I f IGrade Pwiallydemolished El _ _ r_ I_ n_ I_ nn|'I page 18 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily [n __ demolished [ [o [ [. [o [o [7 [n Wholly demolished [n [ [l [ [7 [7 [7 [ [7 [7 [7 [7 Grade Partially demolished [ [7 [7 [7 [7 [o [ [ [ 6 Temporarily [O __ demolished [O E [7 El [n [ [ [7 [7 [ [ [7 Wholly demolished [ [7 [7 [7 [ [7 [7 [7 [ [ [ [ subtot Partially demolished [7 [ [7 [7 1.00 29.56 [7 [ [7 [7 0 al Temporarily [ demolished [O [ [ [ [O [ [l 7 l 0 O [ Wholly demolished [7 [ 7 [ [7 [7 O7 7 [7 [ [7 [ Grade Partially demolished [ 0 [7 [7 [ O7 [ [ [ [ 1 Temporarily [O demolished 7 [ [ [ [ [ [ 7 [ [ 7 [7 Wholly demolished [7 [ [ [ [ [7 [ [7 [7 [7 [7 [7 . Grade Partially demolished [I [7 [7 [7 [7 [7 2 Temporarily [O demolished [ [ [7 7 [ [ [ [ 7 [ [ [7 Wholly demolished [ [7 [ [7 [ [7 [7 7 7 [ [ [7 . G rade Partially demolished [ [ [ [ [ [ [ [ [ [ [ 3 Temporarily n Tempor demolished 7 7 7 7 7 7 7 7 7 [ [ [7 ary Foctor Wholly demolished [ [ [7 [ [ [7 1.00 24.07 7 struct E ure y Grade Partially demolished [ [ [ [ [ [7 [7 2.00 149.15 [7 before buildi 4 Temporarily O expira ng demolished [ 7 [ [7 [ [ [ [ 40.21989739 500 E7 tion Wholly demolished [[ [ [7 [7 [ [7 [7 [7 [7 [7 07 Grade Partially demolished [ [ [ [ [ [ [ [ [ [ [ 5 Temporarily O7 __ demolished [ [l [l [_ [ [l [ [ [7 [7 [7 C7 ___ ____ Wholly demolished O_ __ aO_ O O O -- OO __ n7 Grade Partially demolished 0[77 E7 1.00 47.74 [[ n o oo page 19 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) nF] ] n n n n n o n n [ n n Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price - Temporarily n] demolished O n n n n 53.06374454 500 26531.87227 n] n] o n] Wholly demolished nn0 n 0 nF] F n n 1.00 24.07 n El subtot Partially demolished F F] n n ] 1.00 47.74 F] Fn 2.00 149.15 El al Temporarily j ] n _____ demolished F] El n] n] n] 53.06374454 500 26531.87227 El 40.21989739 500 n] Wholly demolished [n n F] n] n El o] on n] Grade Partially demolished O O O O O n o o o o o Temporarily O] demolished O O O O n o o o o o o O] Wholly demolished O] F] El O O] O] O LI F FO OO O] Grade Partially demolished O] O] O O El O O O 2 Temporarily O] demolished F] F F F] F] F] F] F] F] F O] O] .Wholly demolished O El O] O O O] El El F] O El Grade Partially demolished n El F F El F] o F] o El oo 3 Temporarily O Tempor demolished O] El O F] 1 40.10532105 650 26068.45868 O O O ary Wholly demolished O O O O O O O O 1.00 37.52 O] s truct t O ure Other Grade Partially demolished O] OF El 1.00 12.24 El F] F] F El before uses 4 Temporarily O expira demolished O El O O] O O F] 1 4.720362782 500 n tion Wholly demolished OF O O] O O OO O Grade Partially demolished n F] o] El o] oo 5 Temporarily O_ demolished O] F] F] El O] O] El O] El O] O El Wholly demolished O] F] O] F] 1.00 27.45 O O] Grade Partially demolished El O] E l Fo o] oo 6 Temporarily FO demolished IFFF F E] El F] F F F O] ____ _ Wholly demolished n n n - r -I - O 900- _. 7 - - [ F] subtot Partially demolished O n oF 1.00 12.24 F] F] O page 20 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) nnF] F] ] n] c] [F n] F] n] o] n V F] Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price a' Temporarily 11 ______ demolished 0 0 0 F 1 40.10532105 650 26068.45868 1 4.720362782 500 n] Whollydemolished ] F] F] El F] F0 F] F] 0 ] F0 0 ] O] Grade Partially demolished 2.00 335.03 F] O OF] 1.00 9.25 0 ] 1 Temporarily n] demolished 0] 111.51442 800 89211.53603 0 O C] F] F] 6.513449728 650 F] Wholly demolished n o F] o] F F] E F] o n] F] F] Grade Partially demolished n o] o] F] F] o] F F] F] F] no 2 Temporarily 0] demolished O O F] O O O O O F] F] .Wholly demolished El El F] E O F] F] El O] F] E F] Grade Partially demolished 3.00 125.69 F] F] F] F] 0] 0] 7.00 194.55 F] 3 Temporarily E Tempor demolished F] F] F] El 1 40.10532105 650 26068.45868 O 0 F O ary Wholly demolished F] F] F] F] 1.00 277.80 F] 0 7.00 744.75 0 sturuec total Grade Partially demolished 11.00 1,618.85 E] F] 6.00 423.59 ] F 6.00 354.84 F] before 4 Temporarily 0 expira demolished 1 381.5187407 650 247987.1814 F] 189.5083505 600 113705.0103 2 112.9533346 500 F] tion Wholly demolished El O El F] F] El F] F] o o F O] Grade Partially demolished ] O 0 ] ] ] ] ] ] 0 F 5 Temporarily F] demolished 0 F O 0 O O 0 O 0 0 0 F] Wholly demolished F] F] F] F] F] F] F] F] 1.00 27.45 F] F] Grade Partially demolished 7.00 956.34 0 F] 1.00 47.74 F] F] 2.00 44.26 0 6 Temporarily F] demolished F 169.4554253 550 93200.48389 F] 53.06374454 500 26531.87227 F] 15.02347982 400 F] Wholly demolished F] F] F] F] 1.00 277.80 F] El 8.00 772.21 El F] subtot Partially demolished 23.00 3,035.91 F] F] 7.00 471.33 F] F] 16.00 602.90 F] al Temporarily n] ______ demolished 1 662.4885859 649.6703649 430399.2013 1 282.6774161 588.3219946 166305.3412 2 134.4902641 496.0939141 BF_ Wholly demolished -0 - - O - - - - - - 1.00 --- 50.04 3-- 0] Grade Partiallydemolished FF] F] F]oI n o El oElo page 21 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) [nF] [n [l [ [7 [l [7 [7[n [r [o [ [n [o [o Frame structure Composite structure Brick and timber strucl 1_____ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily [n demolished [7 [7 [O [7 O7 [7 [ [ [7 [ o7 [7 Wholly demolished [7 7 o E7 [7 o [ [7 [7 [ [7 [7 Grade Partially demolished [7 [7 [ [7 [7 [7 [7 [7 [7 0 07 2 Temporarily [O demolished [ [ 7 7 o o 7 7 7 [ [ [7 Wholly demolished 07 [7 0 0 n7 o [7 [7 [7 [7 o [ Tempor Grade Partially demolished [ 0 0 0 [ [7 [7 [7 [7 07 Temory 3 Temporarily ary o struct demolished [ 7 7 7 7 O O 7 [ [ [ n7 ure Wholly demolished [7 [0 [7 [7 07 07 [7 2.00 101.46 0 O after Housin Grade Partially demolished 0 0 [7 0 1.00 107.68 [7 [ [ 0 [[ expira g- 4 Temporarily [7tion/i demolished [ [ [ [7 [ n7 c7 [l [ [ 7 O llegal Wholly demolished 0 0 [7 [7 [7 [7 0 0 [7 [ [7 O struct Grade Partially demolished [7 0 [7 0 [7 [7 [7 [ [7 [7 7 ure_________ Temporarily O7 demolished [[ [7 [ [7 [7 [7 [ [7 [ [ 07 Wholly demolished 7 [ 0 0 [[ [7 [7 [7 [7 0 [7 E7 Grade Partially demolished [7 [7 0 0 0 [ [7 0 [7 0 0 6 Temporarily [7 demolished [O [O [l [7 [ [C [O [7 [7 [ [ [7 Wholly demolished [7 [7O[ [7O[ O OO 3.00 151.50 [7 [7 subtot Partially demolished [ 0 0 [[ 1.00 107.68 [7 [7 0 [ 0 al Temporarily E7 demolished [l [O [O [7 [O [7 [7 [7 [ [7 [ n7 Wholly demolished [7 0 [ [7 [7 0 [[ 0[ [7 0 [7 n7 Grade Partially demolished 7 7 7 7 7 7 7 7 7 [ o 1 Temporarily [O __ demolished [ [7 [7 [7 [7 [7 [ [7 [ [ O] [7 __ Wholly demolished n n n o o - - - - - [ .. _ _ [7 Grade Partiallydemolished [7 E7 [ [ [7 0 [ page 22 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) LiLi Li Li LiLil Li Li Fo oi n r. ni n oo Frame structure Composite structure Brick and timber struct quantity Floor area Unit price |Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily Oi demolished nI El Li Li Li oi El Li Li Wholly demolished OL O Oi Li Li o Li o El oo O Tempor Grade Partially demolished L L L O ary 3 Temporarily Listruct demolished Li o El o Li Li Li i o o o L ure Wholly demolished Oi O O El Li n Li o El o oi L after Shop Grade Partially demolished Oi O Li Li Li O n o oo expira 4 Temporarily Oition/i demolished O Oi Li Li l n n o oo LI legal Wholly demolished Li Li L Li L Li Li Li L Li Li n struct Grade Partially demolished L LI L Li Li Li Li L L El O Li ure 5 Temporarily Li demolished n i o o n o r o o o o Li Wholly demolished Oi Oi El El Oi Li Li o o o o Oi Grade Partially demolished r El Li ri El oi Li o El o o 6 Temporarily Oi demolished O L O O O O r o o o o Oi Wholly demolished L Li Li Li L Li El Li L Li Li Li subtot Partially demolished O Li O Li Li Li O O L Li L al Temporarily Li demolished L DI Li O L L El n Li Wholly demolished OL Li Li oi oi o Li Li Li oi ni Grade Partially demolished O OI O Li Li n o Li o Li 1 Temporarily Li __ demolished O Li Li L L LI O Li r L ni Wholly demolished Li Oi Li nL o o o oo Li Grade Partially demolished O i i i i i i i i o L 2 Temporarily Li demolished Oi O OL El O Li Li no Li __ __ _ Wholly demolished I Ol F p FL - -n- -o- -o Q -- - - El n TemDor Grade Partially demolished Li LiOL iL LiOI El oL o L page 23 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallJ municipal for Datansha project (pipe network) Fnn] ] Fn r n] ,] o o Fn o] El G] F Frame structure Composite structure Brick and timber struci _____*____.,____ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price ary - Temporarily n struct demolished n] El o] El El o o o ao n ure Wholly demolished n] o] 1.00 22.67 O] F] F] F] O n after Office Grade Partially demolished [ F o o expira 4 Temporarily O tion/i demolished F] El, .] F] F] F] F] F] F O Ilegal Wholly demolished F El F] F] F F] F] F] El El E struct Grade Partially demolished El O O F] F ] 0 El F] F] F] ure 5 Temporarily [l demolished F] El F] F F] F F] F] F] Wholly demolished O O] O El O El F] F] F] Grade Partially demolished OF O F] O F] n o F] 6 Temporarily O] _ demolished O El F] O O El r F] El o El F] Wholly demolished O El O F] 1.00 22.67 n o F] o El F] subtot Partially demolished nF ] o ] ] ] F] F] o al Temporarily F] ___ demolished _ El F F F] F] F F] n W Wholly demolished O El El O F] O O] O O El F] F] Grade Partially demolished O El O F] O F] O F] El F] Temporarily F] ndemolished O El F] El FO O F o_ oo ] - Wholly demolished El El F] F F F F] F] F El O F] Grade Partially demolished O] O F] F] F] F] O] F] F] F] 0 2 Temporarily El demolished F] F F] F] F El F] F F] F] El n] Wholly demolished n F] o] o n o F] n o o F] F] TemporGrade Partially demolished El n] o o F] o] El o F] o o Tempor 3 - ary Temporarily Ostruct demolished n o o o o o o o o o o F ure Foctor Wholly demolished F] F] O F] F] Ooi - -- _E _ n after y Grade Partially demolished E ] ] ] F] F] F] F page 24 of 64 r .~~~~~~~~~ Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) [] [ [ [[7 [[ n] [n [n [n [r [r Frame structure | Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price e x p ra ME=l1 - Temporarily [n tion/i ng demolished [ n [o o n [o [o o o O llegal Wholly demolished [ [O [1 [O [O [O [O [O [O n struct Grade Partially demolished [[ [ [ [O [O [7 [7 [7 5 Temporarily F] demolished [O [O [O [l [O [O [ [7 [ [n [7 n_ Wholly demolished O[ O7 F] O El [7 F] O F] [ O7 Grade Partially demolished [[ [ [ [ [ [ [ [ O OO 6 Temporarily [7 demolished [O [ [[ [o [o [] [ o7 F] [n Wholly demolished 7 [O 7 O7 F7 E7 F7 o7 7 o [7 subtot Partially demolished [1 [ [ 7 7 [7 [ [7 [ [ a' Temporarily [7 ___ __ demolished [ [ [] [O [O [O [ [l O [ [ [ Wholly demolished [7 [7 [7 [ [ [7 [7 [ [7 [7 [7 [7 Grade Partially demolished [ [7 [ [ [7 [7 [7 [7 [7 [7 o7 1 Temporarily O7 demolished 7 [ [ [ [ [ [ [ [ F] Wholly demolished [ 7 7 7 E7 E7 [7 [7 [7 O7 [ O7 Grade Partially demolished [ [ [ [7 [7 [7 [ [7 2 Temporarily [7 demolished C 7 7 7 7 7 7 7 7 [ [ [7 Wholly demolished [ [ [ [7 [7 [7 [7 [ [ [7 [7 [7 TemporGrade Partially demolished [7 [7 [7 7 7 7 [ 7 [ [ [ Tempor 3 Temporarily ary O struct demolished O7 [n [ [7 [ [ [o [7 [ F7 ure Wholly demolished [ [7 [7 [7 [ [ [7 n after Other Grade Partially demolished [7 [7 [ [7 [ [7 [7 [ [ [7 [ expira uses 4 Temporarily [ tion/i demolished 7 [ [ [ [ [ [ [ [ 1 legal Wholly demolished F] O O O - - - - _ - [ Strucat - -________ ____________ ____________ __ n ureGrade Partially demolished C77 F] [7 O7 El O O OO page 25 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) Frame st.ructure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price b Temporar il1y n] demolished n] o r n n oodnlneno n____ __Wholly demolished n o o o o o o o o El r _ _Grade Partially demolished O 0 O n o o o n n o 6 Temporari ly n ]demolished 0 n n n o r o n o El n] Wholly demolished O El r1 r1 o o o o o oo O1 subtot Partially demolished O0 01 O1 O O1 n r o o o a' Temporar il1y O _____ _____ _____ F] _demoli_shed n o o o ooorooo r FWholly demolished O O O n o n r o 1.0 50.04 O O Grade Partially demolished FC an t struco 1 Temporarily 0] . _ demolished l [ o ] n r o F] oo n] Wholly demolished O O n o o o o n o o o Grade Partially demolished O O O O O 0 0 O O O O 6 Temporarily O] __ demolished F] F] F F] o o o o Fo oEol F] Wholly demolished 0 O F] 0 O F] o F] F] o] o F] Tempor . Grade Partially demolished El n F] F F] F] F] o F] o El ary a Temporarily n struct demolished n El F] n] o o] o _ F ] oo n ure Wholly demolished ] r ] o F.]0 22.67 0 O 2.00 101.46 F n after total Grade Partially demolished ] O 1.00 107.68 El F] F] El expira 4 Temporarily tion/i demolished nF El o o o o o F F] legal Wholly demolished ] n F] F] Fo F] El F] n r uc Grade Partially demolished Fn o o F] F] F] 5 Temporarily n] __ demolished El O] El F] F 0 O] El F] F] El F] _ __ _Whollydemolished F] F] Fr] r n n o -- __ o _ _ F| | IGrade tiallydemolished F] E F]| E F] F] I F] I I El page 26 of 64| Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicalII municipal for Datansha project (pipe network) FE] F F ~~~1 FF E l 1 F El F F] F L Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily F __ demolished F F O F n F n n [] o n Wholly demolished O O O O 1.00 22.67 0 F 3.00 151.50 O n subtot Partially demolished E F [] F 1.00 107.68 O 1 1 [ F al Temporarily O ___ __ __ demolished O O O F o o o o o o o F Wholly demolished 4.00 80.57 800.00 64,459.00 4.00 489.07 1,794.15 877,469.81 4.00 247.40 2,480.91 O Grade Partially demolished 7.00 1,520.27 2,701.11 4,106.427.31 19.00 1,535.93 2,582.92 3,967,182.13 19.00 847.88 1,970.38 1 Temporarily FO demolished 4 1099.481414 800 879585.1314 7 478.183628 750 358637.721 1 454.4043842 650 F Wholly demolished F F F F F] F F F F F F Grade Partially demolished FF FFOF FO 2 Temporarily F __ demolished F F F F F F F F F F F F Wholly demolished 7.00 2,444.53 2,546.40 6,224,761.62 9.00 456.21 1,975.97 901,461.09 1.00 20.70 2,310.00 F Grade Partially demolished 25.00 5,272.91 2,376.01 12,528,505.37 16.00 1,327.61 2,426.67 3,221,679.15 27.00 1,196.30 1,226.21 3 Temporarily F ______ demolished 11 3220.140246 700 2254098.172 10 574.6583601 650 373527.9341 7 392.9214752 550 F Wholly demolished 40.00 10,391.91 2,453.03 25,491,624.06 25.00 1,889.00 1,915.24 3,617,899.96 9.00 768.50 744.89 F Total Housin Grade Partially demolished 122.00 20,362.32 2,150.26 43,784,213.93 57.00 4,312.19 1,878.97 8,102,474.13 22.00 897.61 1,015.26 g 4 Temporarily F demolished 20 9204.150446 650 5982697.79 12 1491.507809 600 894904.6852 8 475.218536 500 F Wholly demolished F F FF F F Grade Partially demolished F F F F F F F F F F F 5 Temporarily F demolished F F F F] F F F F F F F Wholly demolished 30.00 4,367.41 2,095.70 9,152,800.79 28.00 2,286.17 1,978.50 4,523,193.63 13.00 610.52 1,940.00 F Grade Partially demolished 45.00 6,667.25 1,803.46 12,024,130.77 42.00 3,201.37 1,718.40 5,501,220.00 20.00 1,739.48 839.55 6 Temporarily F demolished 17 1081.070256 550 594588.6405 25 938.719767 500 469359.8835 7 958.5352451 400 a _ _ __ _ Wholly demolished 1 81 00 17,28442 2,368.24 40,933,645.47 66.00 I5,1A20.6 1,937.33 69920,024.50 22700 4. 42 4;468.29 F subtot Partially demolished 199.00 33,822.75 2,141.85 72,443,277.38 134.00 10,377.10 2,003.70 20,792,555.41 88.00 4,681.27 1,176.87 page 27 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) [[ [7 n ] [7 [7 ElnF7 c77 n7 n7 n7 o7 o on Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price a' Temporarily [n ______ ______ demolished 52 14604.84236 664.9143821 9710969.734 54 3483.069564 601.8915745 2096430.224 23 2281.07964 496.4723752 [7 Wholly demolished n l [ [ [ [ [ [ [o [ [7 Grade Partially demolished [n o [ 1.00 35.94 4,690.00 168,548.08 1.00 9.25 0 1 Temporarily [7 ____ demolished [O [7 [7 [ [7 [ [ 76.513449728 650 [7 Wholly demolished [7 [[ [7 [7 [7 [7 [7 [7 [ [7 [7 Grade Partially demolished [7 [7 [7 [7 [7 [ [7 [7 [7 [7 7 2 Temporarily [n . _ demolished O7 [7 [ [7 [7 [ [7 [ [7 [7 [7 [7 Wholly demolished 2.00 668.16 2,550.00 1,703,802.62 1.00 8.93 650.00 5,807.75 1.00 56.20 2,150.00 [7 Grade Partially demolished [7 . [ [7 [ 3.00 323.27 774.12 250,249.21 1.00 95.55 550.00 3 Temporarily O7 ______ demolished 2 15.85056424 700 11095.39497 [ 143.9078422 650 93540.0974 1 50.21307361 550 O7 Wholly demolished 8.00 552.04 1,736.76 958,762.20 8.00 546.40 1,428.55 780,553.81 3.00 9 913.65 158.30 1 Total Shop Grade Partially demolished 37.00 3,770.15 1,419.95 5,353,402.33 18.00 1,682.19 1,403.37 2,360,732.17 13.00 1,532.76 1,146.47 4 Temporarily n7 ______ demolished [ 1669.659845 650 1085278.899 1 592.6771275 600 355606.2765 1 589.3260343 500 O7 Wholly demolished [7 [ [ [7 [7 [7 [7 [7 [7 [7 [7 n7 Grade Partially demolished [7 [ [7 [7 [7 [7 [7 [7 7 [ 0 5 Temporarily O7 demolished [7 [l [7 [7 [ [ [7 _ _ __ O7 Wholly demolished 7.00 773.02 1,920.95 1,484,926.15 5.00 1,052.09 714.82 752,049.25 O7 [ 17 E7 Grade Partially demolished 8.00 1,501.51 753.29 1,131,068.74 8.00 1,022.65 1,064.25 1,088.353.15 1.00 32.02 1,850.00 6 Temporarily [O . demolished [7 98.38406098 550 54111.23354 [7 396.4664634 500 198233.2317 [7 [ [7 [7 Wholly demolished 17.00 1,993.22 2,080.80 4,147,490.97 14.00 1,607.42 957.07 1,538,410.81 4.00 969.85 273.72 [7 subtot Partially demolished 45.00 5,271.66 1,230.06 6,484,471.07 30.00 3,064.04 1,262.35 3,867,882.62 16.00 1,669.57 1,119.48 al Temporarily [7 ______ demolished 2 1783.89447 644.9291407 1150485.528 1133.051433 571.3594164 647379.6056 2 646.0525576 505.3984325 n- __ ___Wholly demolished n ___ o [ o - E [7 O7 Grade Partially demolished 2.00 752.02 5,300.00 3,985,695.12 5.00 911.56 3,763.26 3,430,440.94 1.00 57.27 650.00 page 28 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) FF] F] F] F] ElF] El F] F] El El F] Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily O] ______ demolished F 142.1543977 800 113723.5182 2 99.72816747 750 74796.12561 0 32.17713976 650 n] Wholly demolished n o o F o- 0] Grade Partially demolished El F] F] F] F] 2 Temporarily n] __ demolished 0 O O 0 0 n o o o o F] Wholly demolished El F F 0 F] F] F] F] F F] F] Grade Partially demolished 6.00 827.24 3,189.19 2,638,213.93 6.00 187.43 2,396.77 449,218.36 0 0 0 3 Temporarily F] ______ demolished 1 375.2229763 700 262656.0834 2 169.4890699 650 110167.8954 0 0 n F] .Wholly demolished 2.00 315.53 863.26 272,386.23 11.00 254.04 2,076.76 527,588.13 F] F] 0 Total Office Grade Partially demolished 9.00 1,272.45 1,770.65 2,253,075.28 13.00 701.99 2,461.85 1,728,199.98 1.00 112.77 500.00 4 Temporarily F] ______ demolished F] 418.6325376 650 272111.1494 3 318.9333842 600 191360.0305 0 0 0 F] Wholly demolished O O O O O F] El O El O F] Grade Partially demolished F] o ] o F] El F] F] 5 Temporarily F] __ demolished O O O O O O O O O O O n] Wholly demolished 2.00 90.28 1,276.58 115,244.38 10.00 1,028.17 1,898.74 1,952,225.05 0 0 0 F] Grade Partially demolished F] El F] F] F] n oF F] F] F] n 6 Temporarily O] __ demolished OF] F] F] El o F] o F] o F] O] .Wholly demolished 4.00 405.81 955.21 387,630.61 21.00 1,282.21 1,934.01 2,479,813.18 F] 0 F] F] subtot Partially demolished 17.00 2,851.71 3,112.87 8,876,984.32 24.00 1,800.98 3,113.78 5,607,859.28 2.00 170.04 550.52 al Temporarily n] ______ demolished 1 936.0099117 692.8246624 648490.7511 7 588.1506215 639.8429888 376324.0515F 0 32.17713976 650 n] Wholly demolished 1.00 32.94 2,980.00 98,172.37 4.00 112.64 750.00 84,479.42 0 O El O] Grade Partially demolished 3.00 668.32 3,800.00 2,539,597.51 5.00 1,226.77 3,256.75 3,995,284.86 5.00 691.39 650.00 1 Temporarily O] ______ demolished F] 192.0194012 800 153615.521 F] 105.1000244 750 78825.0183 F] 451.0912268 650 T __- _ Wholly demelished - O- OHE ElO O& -El ElO - O_ O_O_ F] n] Grade Partially demolished ] F F F . El F] F El page 29 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historical1I municipal for Datansha project (pipe network) Fl F] II] V [ii I] ElF] F]~~~~~~~~~~~~~~~~~~~~1 EJ, F F] Li F Frame structure | Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily n] __ demolished L] r] El r] r F ] [ n n] r] _ Wholly demolished 1.00 358.01 2,550.00 912,931.87 1.00 68.44 2,690.00 184,110.33 El I] FO Grade Partially demolished 8.00 1,584.70 2,479.09 3,928,614.31 13.00 2,491.74 2,465.23 6,142,725.55 5.00 486.93 550.00 3 Temporarily r] ______ demolished 1 55.0306046 700 38521.42322 4 1025.243618 650 666408.352 1 126.9853635 550 O] Foctor Wholly demolished 2.00 155.55 650.00 101,107.96 3.00 309.29 2,366.62 731,964.91 1.00 24.07 F] Total y Grade Partiallydemolished 26.00 5,850.86 1,200.02 7,021,170.65 24.00 3,909.75 1,138.21 4,450,118.64 11.00 1,852.79 1,199.25 Ttlbuildi 4 Temporarily 1F1 ng ____n demolished 2 2311.260006 650 1502319.004 3 1147.808937 600 688685.362 1 661.9966463 500 F] _ Wholly demolished F] r] F] r F] El F] O F] Fr F] F] Grade Partially demolished F O] r] O] n O] n] O] r] F O 5 Temporarily F] __ demolished O O O r r O r r O O r F] Wholly demolished El FO F] F] 1.00 41.28 500.00 20,637.80 O] O n O] Grade Partially demolished 5.00 1,318.96 2,135.20 2,816,253.73 9.00 1,630.34 1,995.91 3,254,005.24 14.00 2,277.20 885.11 6 Temporarily O] demolished F] 406.0970935 550 223353.4014 1 403.6193694 500 201809.6847 F] 876.90177 400 F] Wholly demolished 4.00 546.51 2,035.13 1,112,212.20 9.00 531.64 1,920.82 1,021,192.46 1.00 24.07 0 F] subtot Partially demolished 42.00 9,422.84 1,730.44 16,305,636.19 51.00 9,258.60 1,927.09 17,842,134.29 35.00 5,308.31 933.39 al Temporarily O] ______ ______ demolished 3 2964.407106 646.9453356 1917809.35 8 2681.771949 609.9431451 1635728.417 2 2116.975007 493.5392601 F] Wholly demolished F] F] F] F] F] F F] F F F F F] Grade Partially demolished 3.00 585.28 3,800.00 2,224,047.97 .2.00 473.25 979.59 463,597.61 O F] 0 1 Temporarily F] ______ demolished F] 91.46996188 .800 73175.96951 1 171.6985507 750 128773.913 O] O F] F] Wholly demolished O F] F] 0 O F F]OF] I O F] El n] Grade Partially demolished F] F El O F] O El El F] F 2 Temporarily n] demolished I O O] O] O] El O O] OO O] __ _ _ _Wholly demolished 1.00 57.69 700.00 40,383.00 4.00 157.01 65f000 1020ss6 L00 ----35.75 5.5.00 F] Grade Partially demolished O] El El F] 5.00 95.64 650.00 62,167.99 El F F] page 30 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) nTh F n n n [ 1] n11 [n r n [o n n E[ Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily O demolished n o o n 2 175.3921221 650 114004.8794 [O H O O7 Wholly demolished 2.00 98.59 650.00 64,084.11 11.00 457.64 600.00 274,581.68 1.00 37.52 O Total Other Grade Partially demolished 4.00 492.83 1,826.73 900,269.35 15.00 628.81 863.70 543,100.84 1.00 173.79 2,050.00 uses 4 Temporarily n demolished O 46.4857136 650 30215.71384 1 438.202832 600 262921.6992 1 78.64610422 500 O7 Wholly demolished O O ° O O H O O H ° O H El Grade Partially demolished El O = H H H H H H H H 5 Temporarily O _ demolished O O O O O O O O O C O O7 Wholly demolished 2.00 251.18 550.00 138,147.51 2.00 22.79 500.00 11,396.60 1.00 27.45 H n7 Grade Partially demolished 1.00 33.65 550.00 18,506.49 5.00 161.54 500.00 80,769.11 O E O 6 Temporarily O demolished O 16.68408537 550 9176.246953 H 12.98587334 500 6492.936671 H H H O Wholly demolished 5.00 407.46 595.43 242,614.63 17.00 637.44 608.74 388,033.97 3.00 100.72 195.22 H subtot Partially demolished 8.00 1,111.76 2,826.90 3,142,823.82 27.00 1,359.24 845.79 1,149,635.55 1.00 173.79 2,050.00 al Temporarily El demolished H 154.6397609 727.936526 112567.9303 4 798.2793781 641.6217709 512193.4282 1 78.64610422 500 n7 Wholly demolished 5.00 113.52 1,432.65 162,631.37 8.00 601.71 1,598.68 961,949.23 4.00 247.40 2,480.91 El Grade Partially demolished 15.00 3,525.88 3,646.11 12,855,767.90 32.00 4,183.45 2,874.43 12,025,053.631 26.00 1,605.78 1,343.44 1 Temporarily O demolished 4 1525.125175 800 1220100.14 10 854.7103705 750 641032.7779 1 944.1862004 650 O7 Wholly demolished H O H O ° n H o H H H O7 Grade Partially demolished O H O H H o H H o H H 2 Temporarily n7 demolished El n o H H H H H H O7 Wholly demolished 11.00 3,528.39 2,517.26 8,881,879.11 15.00 690.60 1,728.12 1,193,434.86 3.00 112.66 1,671.66 O7 Grade Partially demolished 39.00 7,684.84 2,484.81 19,095,333.61 43.00 4,425.70 2,288.01 10,126,040.25 33.00 1,778.78 1,004.78 3 Temporarily - n demolished 15 3666.244391 700 2566371.074 18 2088.691013 650 1357649.158 9 570.1199123 550 O _ ___ Wholly demolished 55400 115513.62 26,3R732 26.7i64 5s& 119 (fl 3,456 S 7 1 ,716 42 s,932,588.49 14.00 1,743.74 --41 .23- n Total total Grade Partially demolished 198.00 31,748.62 1,868.18 59,312,131.53 127.00 11,234.93 1,529.57 17,184,625.76 48.00 4,569.72 1,160.50 page 31 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Datansha project (pipe network) r n n] n] [n _________ n o n n n n r n n n ________ Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price 4 Temporarily F demolished 22 13650.18855 650 8872622.556 20 3989.130089 600 2393478.053 11 1805.187321 500 F] Wholly demolished [7 F] [O [l [ _ _ O ___ .11 Grade Partially demolished C 0 E[ [ n [r [ o c ] 5 Temporarily n7 _ demolished E l] o c] El o c El Wholly demolished 41.00 5,481.88 1,986.75 10,891,118.84 46.00 4,430.50 1,638.53 7,259,502.33 14.00 637.97 1,856.52 Grade Partially demolished 59.00 9,521.37 1,679.38 15,989,959.73 64.00 6,015.89 1,649.69 9,924,347.50 35.00 4,048.70 873.17 6 Temporarily [7 demolished 17 1602.235495 550 881229.5224 26 1751.791473 500 875895.7366 7 1835.437015 400 Wholly demolished 111.00 20,637.41 2,268.87 46,823,593.88 127.00 9,179.17 1,671.99 15,347,474.92 35.00 2,741.76 986.07 subtot Partially demolished 311.00 52,480.71 2,043.67 107,253,192.78 266.00 25,859.96 1,904.88 49,260,067.14 142.00 12,002.98 1,064.98 al Temporarily [7 demolished 58 20443.79361 662.3195064 13540323.29 74 8684.322945 606.61674f 5268055.726 *28 5154.930449 497.398650 page 32 of 64 V used house,temporary structure before expiration, shared by other El F] F] F] n El Attached table:18.1.1BD .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 613,776.38 0] F] F] o 3.00 197.36 3,110.00 613,776.38 1,369,418.69 0] F] F] F 27.00 2,655.13 3,393.91 9,011,263.43 159448.3621 O O] O] F 5.00 1,461.99 766.28 1,120,298.96 F] F] F] F] F F] F] F F] 47,820.70 0 0 O F] 1.00 20.70 2,310.00 47,820.70 1,007,923.79 El F] F] F] 25.00 2,511.48 2,697.01 6,773,463.15 102268.4983 El F] El O 12.00 729.38 648.64 473,106.82 O O] O] El F] 5.00 371.76 2,566.96 954,283.03 554,811.56 0 F] F] F 36.00 2,379.47 2,536.81 6,036,270.73 30246.35422 0 F] F] O 12.00 514.45 595.99 306,608.96 El F] F] F] El El F] F] F] F] F]lF F] F] F] F] F] F] 1,184,406.64 El F] F] 38.00 3,232.20 2,139.10 6,913,995.69 965,689.60 F] F] O] F 55.00 5,113.61 2,204.20 11,271.426.00 200448.7116 F] F] F] F 26.00 1,432.62 477.36 683,872.25 1,846,003.72 G F] F] F] 47.00 3,822.01 2,231.78 8,529,875.80 3,897,843.63 El El El F] 143.00 12,659.68 2,614.00 33,092,423.32 492411.9262 F] El F] F] 55.00 4,138.45 624.36 2,583,887.00 F] F] F] El EJ F] F] F] F] El F F] 0 F] 1.00 35.94 4,690.00 168,548.08 F]F F] El F] F] F] F F page 33 of 64 v used house,temporary structure before expiration, shared by other n o ni oi oi o Attached table:18.1.IBD ,ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price o [ ni n oi o o o o o oi ni o n] oi ni oi o o [ i oi oii o ni El oo El 0 O Oi O 1.00 14.03 3,510.00 49,241.74 0 Oi El Oi 0 1.00 6.52 700.00 4,560.88 O El Oi 0 O 3.00 184.18 3,756.96 691,947.93 164,141.69 0 n oi o 7.00 465.72 3,481.61 1,621,451.93 14629.75419 El 0 0 0i 1.00 195.81 585.06 114,559.14 O O O O O O O O Oi Li Li Li Li °i Li o o on Li Li Li Li i Li n Li Li o Li Li o o o o o L El El Oi Oi Oi 1.00 124.53 2,850.00 354,921.02 O O O O El 3.00 184.18 3,756.96 691,947.93 164,141.69 L L L L 10.00 640.22 3,427.20 2,194,162.77 14629.75419 0 El Li El 2.00 202.32 588.76 119,120.02 Li Li Li Li Li O O O O Li Li Li Li Li 6.00 1,587.04 4,636.77 7,358,729.76 El O El 0 O 2.00 226.75 781.35 177,170.09 u1 =1 = = EE 11 rl E n _____ Li Li El O Oi 6.00 671.67 3,516.25 2,361,772.27 page 34 of 64 v used house,temporary structure before expiration, shared by other n] o] o] o] o] o] Attached table:18.1.IBD .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price n o n] o] F] 1.00 214.57 669.81 143,721.06 F[ O O O] F 5.00 188.48 3,026.71 570,463.12 F] F] F] F] F] 9.00 803.38 3,059.46 2,457,893.77 O] OF El 0] 1.00 348.21 609.40 212,197.76 F] F] F] F] F] F] F] F]F F] El F] F] F]F ] ]F El El] F] F] F] ] F ]F El El F] F] F] 2.00 274.93 2,550.89 701,313.01 F]OF] F] O F] 7.00 463.41 2,744.41 1,271,776.13 F]OF] F] El OO 21.00 3,062.09 3,977.16 12,178,395.80 F]oF] F] F] F] 4.00 789.52 675.20 533,088.90 F] F] F] F] O 1.00 32.94 2,980.00 98,172.37 F] o F] F] n 7.00 1,876.37 3,475.25 6,520,843.40 n n F Fn n F] 297.12 782.31 232,440.54 F]0F] F] El FO 1.00 68.44 2,690.00 184,110.33 O F] F] F] F] 14.00 2,483.18 2,751.43 6,832,297.27 o El F] F] o 4.00 882.33 653.12 576,268.35 O _ __ O -E~ ----& E 1.00 -06.09 2590r00 16. 0 2 , -00 274,76I.98 466,686.45 F] OF El 10.00 1,127.49 2,575.85 2,904,232.55 page 35 of 64 v used house,temporary structure before expiration, shared by other oZ n_____________________________ _ o no Attached table:18.1.1BD .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 40256.44904 O_ [ O O 2.00 299.71 581.93 174,411.77 FLI EiL L]li LiLiL Oi 0i Oi Oi Oi 9.00 1,563.54 2,242.11 3,505,620.11 Oi 0i 0i Oi Oi 2.00 327.51 512.57 167,869.47 Oi . i Oi Oi OO 3.00 207.47 2,684.92 557,044.68 466,686.45 O O l Li 40.00 7,050.58 2,803.03 19,762,993.33 40256.44904 [1 = l n [ 8.00 1,806.67 637.08 1,150,990.13 Oi Oi O El Oi Oi El O O O O 4.00 624.64 3,781.72 2,362,230.95 O 0i El El 0i 1.00 159.99 778.59 124,569.20 O_______ L O O Oi 1.00 74.09 650.00 48,155.87 Oi Li Li Li Li O O O OO Oi Oi 0i Li i0 1.00 87.02 2,590.00 225,374.19 F] Ci = i [: = i [1 138.94 600.00 83,366.21 1L nLi n fi n____ o ___ oLip < o _ _ ___36of_ __ page 36 of 64 y used house,temporary structure before expiration, shared by other ol El E o -] on Attached table:18.1.1BD .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price o] ol o] [n = l n ° [l n ol ol ol ol ol ol ol ol o] ol El E I l E El El o l El El El El~ ~~ ~ El El El l El El El El El El El El El El El ol El El El El 5.00 711.66 3,636.01 2,587,605.14 Ol El El El El 2.00 373.02 686.53 256,091.29 613,776.38 E El E El 4.00 230.30 3,091.40 711,948.76 1,369,418.69 0l El El El 45.00 6,779.11 3,749.99 25,421,615.61 159448.3621 n E E 8.00 2,145.86 771.01 1,654,478.79 El oo D EEl El El E El El El El El El El El El 47,820.70 El El El E 2.00 89.14 2,601.75 231,931.02 1,007,923.79 0 El El El 46.00 5,680.36 2,819.68 16,016,774.44 102268.4983 El E El El 19.00 1,906.88 653.32 1,245,812.98 El El El El E 14.00 850.49 2,929.42 2,491,456.06 1,185,639.69 E El 0 E 63.00 4,863.07 2,723.63 13,245,223.18 85132.55745 O El El El 16.00 1,497.12 595.24 891,143.85 ElE El El El El El El El El l El El El El El ElE 1,184-406.64 i_ n n40 3,507 13 1 71 38 7,615,30870 _-__ 965,689.60 0 El El E 65.00 6,801.68 2,224.74 15,131,967.14 page 37 of 64 v used house,temporary structure before expiration, shared by other El LI 0I El ,I LI Attached table:18.1.IBD ;ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 200448.7116 El [ oI nI 28.00 1,760.12 483.91 851,741.72 1,846,003.72 oI El n El 60.00 4,677.06 2,362.73 11,050,644.54 4,528,671.77 El 0I El L 219.00 24,124.22 2,894.00 69,815,580.37 547298.1295 0 El OI 71.00 7,309.99 635.18 4,643,177.34 OI LI LI LI LI 1.00 283.70 2,550.00 723,441.37 50,193.53 O LI LI LI 2.00 49.75 2,464.14 122,596.51 23798.80723 O I I L L 71.46 698.77 49,935.69 0 LI 0 LL LI 12.00 2,795.62 2,524.54 7,057,654.29 198,889.16 LI 0 LI L 21.00 3,882.85 2,513.50 9,759,540.23 15721.27972 0 0 LI LI 8.00 3,046.20 693.55 2,112,677.80 354,861.27 I I L L 53.00 11,662.54 2,422.99 28,258,269.88 52,716.17 1.00 28.02 1,750.00 49,031.48 116.00 18,412.58 2,427.76 44,701,362.90 25936.51968 1.00 29.89 300.00 8,966.69 19.00 8,701.51 644.23 5,605,735.57 LI LI LL LI El LI LI LI LI LI L LI LI L LI LI El L L LI LI El LI LI LI LI El LI nI LI 21.00 3,407.92 2,233.96 7,613,168.34 20,058.07 OI OL LI LI 25.00 3,043.87 2,220.20 6,758,022.90 14345.84155 Li LI L L 12.00 823.63 531.74 437,963.16 354,861.27 LI LI L no 87A.0 1R,1.49-.7 .24A15J 3. -uw243i __.____ __-______-_ 321,856.94 ~ 1.00 28.02 1,750.00 49,031.48 164.00 25,389.06 2,416.06 61,341,522.54 page 38 of 64 V used house,temporary structure before expiration, shared by other o [1 F] n n o Attached table:18.1.1BD -ure Simple strure re Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 79802.44819 1.00 29.89 300.00 8,966.69 39.00 12,642.81 649.09 8,206,312.21 H1 H ° o H1 H H H H H HlH HoH HoH H H H n H H H H H H H HoHH H H H H H Ho HoHH H H H H H Ho H HnH HoH HoH H H 120,838.06 H H H 0 3.00 724.36 2,518.96 1,824,640.68 H 1.00 30.48 1,850.00 56,379.03 1.00 30.48 1,850.00 56,379.03 14917.4287 1.00 96.66 350.00 33,830.84 - 3.00 133.12 415.29 55,282.78 H 0 H] H H] Hl 11.00 365.83 2,382.12 871,461.37 1,238,786.95 2.00 55.13 1,750.00 96,480.54 30.00 2,644.94 2,328.94 6,159,904.33 115818.3094 H 30.39 300.00 9,117.23 H 1,251.75 610.51 764,209.53 H H H H H H H H H H H H H H H H H H HnH H H H H H H H HOH H 0 H 6.00 769.20 2,212.09 1,701,541.93 59,242.37 H H H H 5.00 395.04 2,124.69 839,343.64 o H H H H H 340.87 506.24 172,561.78 120,838.06 H H H 0 20.00 1,859.40 2,365.09 4,397,643.98 1,298,029.31 3.00 85.61 1,785.60 152,859.57 36.00 3,070.46 2,297.91 7,055,627.00 130735.7381 1.00 127.05 338.04 42,948.07 3.00 1,725.74 574.86 992,054.09 __-B H O H H O O O O O L H H H H H H H H H page 39 of 64 v used house,temporary structure before expiration, shared by other o n o o o n Attached table:18.1.IBD ;ure . Simple structure | Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price o U U o] U U U U U U U U U 2.00 264.17 2,550.00 673,633.47 U 0 U 0 U 1.00 306.72 697.31 213,876.18 U U U U U 3.00 437.46 2,450.00 1,071,772.75 o U U U U U 108.78 650.00 70,704.46 UU U U U 1.00 607.35 2,050.00 1,245,073.83 o o o n o o o o o~~~~~~n 1 U o UU Ul U 1.00 607.35 2,050.00 1,245,073.83 U U U U UO 5.00 701.63 2,487.65 1,745,406.22 U - UU U U 1.00 415.49 684.92 284,580.64 U U U U U U U U U U U U U U U U U U U- U U U U U U U U Uo UU U U I n I o n ___ UoU U U n U U U U page 40 of 64 V used house,temporary structure before expiration, shared by other n o fEl Fo n Attached table:18.l.1BD ;ure Simple structure Total Total price quantity Floor area |Unit price Total price quantity Floor area Unit price Total price = l Fl ol [T o oT ol o] I] nl Fl El [ Fo 1.00 358.01 2,550.00 912,931.87 o] . ] F] ] ] n 3.00 1,187.721 2,497.46 2.966,296.68 r] F] [] o] o El 127.81 650.00 83,079.43 O] 1.00 44.23 1,750.00 77,409.63 3.00 247.44 2,160.61 534,612.55 1,326,211.73 OF 0] O 12.00 2,624.17 2,324.24 6,099,204.98 145288.4504 Fl F El 0I F 798.66 592.65 473,325.37 F] F] F]~ ~~ ~ El F] El F]F]F O] 1.00 21.02 1,550.00 32,584.88 1.00 21.02 1,550.00 32,584.88 1,409,438.65 El F] F] 0] 7.00 2,168.50 2,087.79 4,527,369.52 99577.036 0 O C 0 O 674.86 490.42 330,962.79 O] 2.00 65.26 1,685.57 109,994.50 5.00 626.47 2,362.65 1,480,129.30 2,735,650.39 F] F] F] F] 22.00 5,980.40 2,272.90 13,592,871.18 244865.4864 F] = = = ] El 1,601.33 554.15 887,367.60 O1 El O O O1 O O El O F] F] o] F] El o El o o F] F] F] F] F] F]~~~~~~~~~~~~E F] F] F] page 41 of 64 V used house,temporary structure before expiration, shared by other oi oi n] oi oi n] Attached table:18.1.1BD ,ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 356,272.96 Li Li L PI 2.00 495.97 2,309.84 I,145,620.06 36962.87072 1.00 28.20 300.00 8,459.90 1.00 105.08 450.54 47,341.43 o1 o o o n o1 El El o ==~~~~~1 El = El 0 E .1 = 356,272.96 El 01 O n 2.00 495.97 2,309.84 1,145,620.06 36962.87072 1.00 28.20 300.00 8,459.90 1:00 105.08 450.54 47,341.43 0 0 1.00 283.70 2,550.00 723,441.37 50,193.530 0 2.00 49.75 2,464.14 122,596.51 23798.80723 El o = c o 71.46 698.77 49,935.69 120,838.06 El O O El 16.00 3,877.99 2,525.85 9,795,226.85 198,889.16 1.00 30.48 1,850.00 56,379.03 27.00 5,365.22 2,507.98 13,455,849.41 30638.70842 1.00 96.66 350.00 33,830.84 12.00 3,613.85 682.07 2,464,916.19 354,861.27 1.00 44.23 1,750.00 77,409.63 67.00 12,275.8i 2.416.49 I964338 2,7,8.1 3.00 83.15 1,750.00 145,512.02 163.00 24,615.13 2,404.13 59,i7,650 page 42 of 64 V used house,temporary structure before expiration, shared by other n _F] o] o] on Attached table:18.1.1BD ;ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 324006.1502 2.00 88.48 300.00 26,543.82 20.00 10,965.78 634.82 6.961,316.36 F] F] F]~~~~1 El F] F] F] El F F] IZ ~~~~11I F] F] F] F]1 F] F] 1.00 21.02 1,550.00 32,584.88 29.00 4,805.50 2,204.22 10,592,368.98 1,488,739.09 FO F] O O] 37.00 5,607.42 2,162.27 12,124,736.06 113922.8776 O] O O] O] 12.00 1,839.36 511.86 941,487.72 475,699.33 2.00 65.26 1,685.57 109,994.50 113.00 21,243.00 2,390.22 50,775,381.00 4,711,809.59 4.00 113.62 1,776.82 201,891.05 229.00 35,637.51 2,381.79 84,881,047.01 492366.5435 3.00 185.14 326.10 60,374.66 44.00 16,490.45 631.74 10,417,655.96 F O El O F 7.00 285.94 764.09 218,487.44 251,023.25 F] O FO 14.00 864.17 706.32 610,384.97 112115.6804 O] O O O] 7.00 387.10 708.19 274,139.51 El O] O El O] O O] O] El O] F] F] F F] F F] F] OO O] F] F] F] El F] O] O] OO n] 0 O O] 4.00 105.12 652.26 68,568.42 260,101.25 O] O O] O] 12.00 1,082.25 632.10 684,095.34 98117.0333 OE I O] O] 8.00 412.14 625.88 257,948.30 217,584.28 1.00 39.43 300.00 11,830.22 16.00 941.96 543.77 512,212.96 303,774.08 1.00 134.17 300.00 40,250.91 49.00 3,621.09 602.96 2,183,379.74 175543.5032 O] C] El F 9.00 1,635.22 608.03 994,268.42 o] El o] n F F - F]- nw n- nn o] F] F] FE El nF oo page 43 of 64 v used house,temporary structure before expiration, shared by other o7 n7 [o n7 [7 [ Attached table:18.1.IBD :ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price [O [0 [0 [0 [ 16.00 921.10 539.19 496,652.16 474,638.90 [ [0 [ [n 40.00 2,995.49 477.44 1,430,166.84 162610.153 [0 [0 0 n7 26.00 807.38 464.09 374,702.15 217,584.28 1.00 39.43 300.00 11,830.22 43.00 2,254.13 574.91 1,295,920.99 1,289,537.49 1.00 134.17 300.00 40,250.91 115.00 8,563.00 573.17 4,908,026.89 548386.3698 . [ [ 7 O 50.00 3,241.84 586.41 1,901,058.38 [7 [7 [7 [7~~~~~1 [7 [7 [7[ [7 [7 [7 [7 [7 [7 [7 [7 [7 [7O [7n[7 [7 [7 [7 [7 [[ [7 [7n[7 [7 [7 [7 [7 [ [7 [7 [7o[7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [ [7 [7 [7 [7 [l [7 [7 [7 [7 0 1.00 8.93 650.00 5,807.75 52,549.84 [7 [7 [7 [7 3.00 404.79 626.40 253,557.31 12699.76179 [7 [ [7 [7 [ 167.00 636.17 106,239.86 144,629.25 1.00 160.99 300.00 48,298.45 3.00 720.88 511.65 368,834.42 354,332.82 [7 [7 [7 [7 24.00 2,988.64 597.77 1,786,520.24 136091.3073 [7 [7 [ [ 1.00 1,166.56 601.56 701,756.04 [7n[7 [7 [7 [7 6.00 1,055.90 507.09 535433.-7 [7 1.00 75.57 200.00 15,114.56 12.00 2,112.18 520.56 1,099,514.16 page 44 of 64 v used house,temporary structure before expiration, shared by other ol El ol nl nl nl Attached table:18.I.lBD ;ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 0 El 25.46 200.00 5,091.77 nl 179.44 473.00 84,874.46 144,629.25 1.00 160.99 300.00 48,298.45 10.00 1,785.72 509.64 910,075.64 406,882.67 1.00 75.57 200.00 15,114.56 39.00 5,505.61 570.25 3,139,591.71 148791.0691 El 25.46 200.00 5,091.77 1.00 1,513.00 590.13 892,870.36 El El El El El El E El E 37,228.17 E El El El 2.00 133.82 707.20 94,634.47 20915.14084 El El E E F 47.31 681.99 32,264.70 El ElE llE El El El El ElE l lE El El El El El El El El El ElElE El El El El El 4.00 78.82 660.07 52,026.54 El5El El El El 1.00 23.43 650.00 15,226.74 El 1.00 13.32 300.00 3,997.35 8.00 371.76 628.12 233,508.59 56,382.66 El El E El 10.00 816.81 621.92 507,991.40 El 1.00 1.69 300.00 507.07 3.00 282.27 641.49 181,076.03 ElEl El El El El El El El El El El El El ~~ ~ ~~~~~ ~ ~~El ElElE El El El~~~1 El El 9.00 236.16 512.71 121,082.59 El El ~~ ~ ~~~ElElEEl EEll El,E E El ElE l lE I-I 0O J132 'I? 300 00 3 997.3 '15 1 0Ct 607 92 ~583 29 354,59 --_ _ _ 93,610.84 El El El El 16.00 1,029.45 635.93 654,652.42 page 45 of 64 v used house,temporary structure before expiration, shared by other o o o n o n Attached table:18.1.1BD .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 20915.14084 1.00 1.69 300.00 507.07 4.00 353.01 647.48 228,567.47 U U U U U 4.00 112.64 750.00 84,479.42 449,400.45 U U U U 6.00 710.10 652.64 463,439.42 293209.2974 1.00 41.23 450.00 18,553.33 1.00 492.32 633.25 311,762.63 U U U U U U U U U U U U U U U U U U UoU U UoU U U U U U U U U U U U U U 267,813.03 1.00 128.36 350.00 44,926.86 10.00 1,020.83 573.54 585,485.79 69841.94992 U 6.83 350.00 2,391.70 2.00 203.94 577.68 117,815.65 U 0 U U U 2.00 155.55 650.00 101,107.96 429,059.60 4.00 270.21 300.00 81,062.32 42.00 8,008.66 604.69 4,842,766.60 125343.475 1.00 70.04 300.00 21,012.11 5.00 3,052.52 614.30 1,875,167.70 U U U U U U U U U U U U U U U U U U UnU U U U U U U U U U U U UO 1.00 41.28 500.00 20,637.80 606,135.52 4.00 468.48 200.00 93,695.40 18.00 2,190.81 368.82 808,018.44 251183.672 U 173.10 200.00 34,620.66 U 886.62 372.72 330,458.30 U U U U U 7.00 309.47 666.39 206,225.18 1,752,408.60 9.00 867.05 253.37 219,684.58 76.00 11,930.41 561.57 6,699,710.26 739578.3943 2.00 291.21 262.97 76,577.80 8.00 4,635.40 568.50 2,635,204.29 O-~ -- 1.00 _ -450 00 43 6W0.13 1.00 96.91 450.00 A3,6101 - U0U UO Ul 1.00 433.89 750.00 325,414.63 page 46 of 64 y used house,temporary structure before expiration, shared by other LL Li L Li Attached table:18. 1. 1BD .ure ________ Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Li Li Li Li El Li 103.17 750.00 77,380.68 19,662.50 0 O O Li 6.00 250.45 647.24 162,101.19 o o i o L 5.00 95.64 650.00 62,167.99 ni Li n o n Li 61.20 650.00 39,780.55 O Li Li E Li 13.00 556.23 608.86 338,665.80 El Li L Li Li 16.00 700.19 612.19 428,648.90 Li Li n Li l 1.00 342.79 606.35 207,852.54 El Li O Li O Li Oi Li Li Oi Li Li Li ' O O El Li oi Li oi ni Li oi Li oi Li Oi Oi Li Li Li 4.00 273.97 545.84 149,544.11 0 Li 0 O El 6.00 195.19 508.62 99,275.60 Li O Li i O Cl 29.67 528.12 15,669.18 19,662.50 1.00 96.91 450.00 43,610.13 24.00 1,177.56 589.29 693,921.22 Oi Li Li Li L 28.00 1,424.91 642.50 915,507.13 LinLi Li Li Li 1.00 536.84 634.61 340,682.95 Oi 1.00 96.91 450.00 43,610.13 12.00 495.50 699.46 346,576.99 737,651.87 Li Li Li Li 23.00 2,141.98 697.43 1,493,873.50 426240.1186 1.00 41.23 450.00 18,553.33 8.00 1,029.91 675.35 695,547.52 i i El n L n n n n___ _ _ _ Li Li Li Li Li Li Li Li A7 page 47 of 64 V used house,temporary structure before expiration, shared by other n7 [n [o [o El n7 Attached table:18.1.1BD -ure Simple strure re Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 19,662.50 [7 [7 [O [7 11.00 364.51 648.76 236,477.36 580,464.12 1.00 128.36 350.00 44,926.86 34.00 2,682.33 610.41 1,637,332.98 180658.745 [ 6.83 350.00 2,391.70 11.00 867.71 618.88 537,011.10 362,213.52 3.00 213.75 300.00 64,126.02 42.00 2,746.38 565.96 i,554,329.72 1,143,549.17 5.00 404.38 300.00 121,313.23 141.00 16,135.40 604.22 9,749,306.88 436978.2854 2.00 71.73 300.00 21,519.18 19.00 6,479.36 611.19 3,960,120.73 [7 [7 [ [7 [ 36.00 2,528.41 523.39 1,323,350.14 1,080,774.42 5.00 544.05 200.00 108,809.97 76.00 7,493.66 458.65 3,436,975.05 413793.825 [ 198.56 200.00 39,712.43 26.00 1,903.11 423.36 805,704.10 381,876.02 4.00 310.66 346.79 107,736.15 101.00 6,134.79 564.12 3,460,734.21 3,542,439.58 11.00 1,076.79 255.44 275,050.06 274.00 28,453.37 573.48 16,317,488.41 1457670.974 3.00 318.36 258.13 82,176.64 64.00 10,280.09 583.50 5,998,383.45 [7 1.00 70.03 [7 [7 3.00 405.05 [7 [7 [7 [1 26.55 450.00 11,945.67 [7 138.06 732.70 101,157.20 o1, _ _l n n n n _ El O7 2.00 33.36 [7 [ 12.00 353.61 [ [ page 48 of 64 v used house,temporary structure before expiration, shared by other nI n oI nI oI nI Attached table:18.1.IBD .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price nl 1.00 13.75 350.00 4,812.95 1.00 13.75 350.00 4,812.95 OI LI El LI LI 3.00 58.77 L LI OI LI LI LI LI 10.00 1,265.40 LI LI 5882.89094 El L LI L 2.00 371.11 623.97 231,558.01 LI LI LI LI LI LI LI LI LI El 1.00 39.59 L L0 10.00 1,040.20 El L 6009.391928 0 1.34 200.00 267.41 0 185.82 535.35 99,477.29 0 L L L L 3.00 58.77 LI LI LI 4.00 142.98 LI LI 35.00 3,064.26 L LI 11892.28287 1.00 41.63 408.94 17,026.03 3.00 708.73 616.60 437,005.45 LI El 0 LL LI 1.00 9.25 LI L 4233.742324 L LI LI L oL 6.51 650.00 4,233.74 Li 2.00 44.36 LI LI 2.00 44.36 0 L L L 12.65 350.00 4,427.96 LI 12.65 350.00 4,427.96 __L 400_ 503.18 n Fn 7 nn I40537 OEO _ - OL 3.00 278.94 LI El 12.00 1,219.86 LI page 49 of 64 v used house,temporary structure before expiration, shared by other o o o n o n Attached table:18.1.IBD .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 28123.64626 OI 52.31 300.00 15,693.10 O 320.24 561.55 179,833.82 U 3.00 893.57 0 0 3.00 893.57 [1 [l El n 342.48 200.00 68,495.87 U 342.48 200.00 68,495.87 [] 4.00 503.18 O O 7.00 1,405.37 [1 U U 8.00 1,216.87 O O 18.00 2,167.04 O 0 32357.38858 O 407.44 217.50 88,616.93 Ul 681.89 376.88 256,991.39 El n - n ° El Eln O 1.00 28.24 O O~~~~~~1 1.00 29.56 El O no Q l. o 2 .5 0 n page 50 of 64 v used house,temporary structure before expiration, shared by other El n F] o E l Attached table:18.1.1BD .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price =~~~~~1 nl ol ol E l oT ol OI LI I] F] O O O 0 3 O LI LI I LI [U LI Fl I OI 1.00 28.24 OI 0] 1.00 28.24 O O O O O Ol 0 1.00 29.56 O O LIL ElI LI E] LI L1I El LI OI LI O OI OI OI El OI OI LI LI LI LI LI LI LI LI LI LI 3.00 288.66 LI LI 4.00 312.73 LI LI LI 5.00 971.49 LI LI 7.00 1,120.65 LI LI 20109.94869 2.00 357.20 300.00 107,161.19 2.00 397.42 320.24 127,271.14 G1 O O1 O O 01 O O O LI LI LI~~F LILIL LI LI Li __ -_ _-~ -O O-_ O _ ___ ______ ___ -- IL 1.00 50.88 L LI 2.00 98.62 L LI I page 51 of 64 | used house,temporary structure before expiration, shared by other El oD nD oD oD oD Attached table:18.1.1BD .ure Simple structure | Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price ED - D 14.53 200.00 2,905.05 Fl 67.59 435.53 29,436.93 0 3.00 288.66 ol LI 4.00 312.73 [l °D O 6.00 1,022.37 El ol 9.00 1,219.27 ED I ED 20109.94869 2.00 371.73 296.09 110,066.24 2.00 465.01 337.00 156,708.06 D ID ED ED E ED ED ED ED ED EDE ED ED ED ED ED ED ED ED ED ED ED ED ED ED ED ED ED ED ED ED ED ED ED ED 2.00 110.47 ED ED 2.00 110.47 ED ED ED ED ED ED ED ED ED ED ED ED ED ED ED ED 1.00 40.11 650.00 26,068.46 ED ED ED ED ED 1.00 37.52 ED ED ED ED ED ED ED 1.00 12.24 ED ED 2360.181391 ED ED ED ED 1.00 4.72 500.00 2,360.18 ED E ED ED ED ED ED ED ED EDE ED ED ED ED ED ED ED ED ED ED~~~ ED ED ED ED ED ED1 ED ED ~~ ~~ED ED ED 1.00 27.45 ED ED ED1 2.00 110.47 11 r] ~4J)f 175-45 FDlD_ _ ________ ED ED ED ED ED~~~~~~~1 1.00 12.24 EDE page 52 of 64 v used house,temporary structure before expiration, shared by other oi n] ni oi ni oi Attached table:18.1.1BD ,ure | Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 2360.181391 Oi 0 OL Oi 2.00 44.83 634.20 28,428.64 Li Li Li Li Li Li Li Li L 0i 1.00 70.03 Oi fL 4.00 414.30 0 Oi 4233.742324 Li 26.55 450.00 11,945.67 O 144.57 728.98 105,390.95 Li 3.00 138.71 O 0 3.00 138.71 Li Oi O 4.00 77.73 O O 14.00 397.97 Li Li El 1.00 26.40 350.00 9,240.91 2.00 66.51 530.90 35,309.37 Li 7.00 791.84 El O 15.00 1,814.39 O O 0 8.00 1,250.43 Li Li 31.00 3,647.71 Li O 56476.66728 2.00 409.51 300.00 122,854.29 5.00 1,093.49 494.77 541,023.15 n o oL o 1.00 27.45 Li Li 0 5.00 984.04 O Li 15.00 2,032.39 0i Li 6009.391928 Li 358.34 200.00 71,668.33 Li 595.88 331.29 197,410.08 Li 10.00 930.55 El 0] 19.00 1,980.55 Li 0 Li 18.00 2,382.22 Li0 L 64.00 6,492.37 O Li 66719.80154 3.00 820.80 262.80 215,709.20 7.00 1,900.46 462.59 879,133.54 0 3.00 281.72 4O0 0 4A)0 3 1L77 0 - - Li 5.00 147.05 Li ni 5.00 147.05 Li Li page 53 of 64 v used house,temporary structure before expiration, shared by other E ° Ol O 0l 0I Attached table:18.1.1BD :ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 0l E 42.27 450.00 19,023.02 0 42.27 450.00 19,023.02 El 0 E Ol [] El 0l 0l [0 El El El El El ElElElE El 11.00 409.43 ElE 0 11.00 409.43 E E C1 5.00 153.56 350.00 53,746.77 5.00 153.56 350.00 53,746.77 0 7.00 207.02 El El 9.00 308.47 El E 13.00 274.40 E E 14.00 382.08 0 0 El 4.00 88.25 300.00 26,473.57 4.00 88.25 300.00 26,473.57 El El El ~~ ~ ~~~El El El El El El El 8.00 115.87 El El 8.00 115.87 El 0 0 13.00 289.05 El El 13.00 289.05 0 El E1 4.00 182.66 200.00 36,531.28 4.00 182.66 200.00 36,531.28 El 18.00 604.61 El El 21.00 756.11 El 0 E 42.00 1,119.93 El El 43.00 1,227.61 El El El 13.00 466.74 290.90 135,774.64 13.00 466.74 290.90 135,774.64 El l El El El El El El El ElE El1 El El El El El El DI El El ElE E llE El o E El El E E o _____ _ o El El El [E El El E page 54 of 64 v used house,temporary structure before expiration, shared by other n o o o o o Attached table:18.1.IBD :ure ________ Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price H 2.00 103.80 H H 2.00 103.80 0 H H H 75.63 350.00 26,472.00 H 75.63 350.00 26,472.00 O 1.00 37.89 0 H 1.00 37.89 H H O H 0.01 300.00 3.04 H 0.01 300.00 3.04 0 1.00 15.53 H H 1.00 15.53 H H H H 7.18 200.00 1,436.30 H 7.18 200.00 1,436.30 H 4.00 157.22 H H 4.00 157.22 H H 0 H 82.83 336.99 27,911.33 H 82.83 336.99 27,911.33 H Ho H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H o H H H H H H H H H H H H H H H H H HO _ 1.00 __484.30 __ [100 4S4.30 F -_ ______ H H H H H H H H H page 55 of 64 y used house,temporary structure before expiration, shared by other ol El El nl IL nn Attached table:18.1.lBD ;ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price El El El El~ ~~ ~ El El El El El Ol El El El El 1.00 22.67 El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El 1.00 484.30 El El 2.00 506.97 El El El El El El El El El El E El El El El El E El ElE El 1.00 20.11 El El 1.00 20.11 ElE El 2.00 13.32 El El 2.00 13.32 El El El 1.00 21.06 450.00 19,478.84 1.00 21.06 450.00 9,478.84 EElEl El El El El El El El El ElElE El ElI El El El El El El El El El El El El 1.00 266.41 El El 1.00 266.41 El El El El El El El El El El~~~~~~~~~~~~~1 El El 1.00 29.53 El E 1.00 29.53 El El page 56 of 64 v used house,temporary structure before expiration, shared by other o] o] o] El F1 F] Attached table:18.1.IBD ure Simple strure re Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price n] r 12.44 300.00 3,730.69 = ] 12.44 300.00 3,730.69 F] El F] F] F] F] F] F] F] O] 1.00 18.95 O O] 1.00 18.95 O] F] 0 1.00 79.47 O] F] 1.00 79.47 F] I O O O 31.82 200.00 6,364.02 F] 31.82 200.00 6,364.02 F] 3.00 305.47 0] 0 3.00 305.47 O El O 4.00 122.32 F] F] 4.00 122.32 E] F] - 1.00 65.32 299.66 19,573.56 1.00 65.32 299.66 19,573.56 F] F] F] F] F] F] F] F] El O 1.00 2.94 450.00 1,322.53 1.00 2.94 450.00 1,322.53 O 1.00 9.23 El El 1.00 9.23 F] F O F] F] F] F] O F] O El 1.00 7.95 El O 1.00 7.95 F] F] F] F] F] F] F] F] o o o = 1.00 5.61 300.00 1,683.18 1.00 5.61 300.00 1,683.18 El _ - n ] ] ] ] ] ] ] o F page 57 of 64 y used house,temporary structure before expiration, shared by other [] [7 [7 [n [n [o Attached table: 18.1.IBD ;ure | Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price [ [o [7 [ [] [7 [7 [7 [o [n [r [r [n [n [r [r n [7 [ 1.00 7.95 [7 [1 1.00 7.95 [ [ [1 1.00 9.23 [l [7 1.00 9.23 [E [ [1 2.00 8.55 351.56 3,005.71 2.00 8.55 351.56 3,005.71 [7 4.00 301.83 [7 [O 5.00 351.87 [7 [7 [l 7.00 160.38 [l [7 7.00 160.38 [1 [ [7 2.00 66.28 450.00 29,824.39 2.00 66.28 450.00 29,824.39 [7 [7 [7 [7 [7 [7[7 [l [ [7 [7 [7 [7 [7 [7 [7 [7 [7 [7c[7 [7 [7 [[ [7 [7 [7 [7 2.00 750.71 [ [1 2.00 750.71 [7 [ [7 14.00 522.45 [ [7 14.00 522.45 [ [7 [7 5.00 229.20 350.00 80,218.77 5.00 229.20 350.00 80,218.77 [ 8.00 214.97 0 [ 11.00 339.09 [7 [ [7 15.00 341.82 [ [7 16.00 449.50 [7 [7 [7 5.00 106.30 300.00 31,890.49 5.00 106.30 300.00 31,890.49 [1 [7 [1 [7 [7 [7 [7 [7 [7 [1 [7 [7 [ [7 [7 [71 [7 [ r[ [7 [7 [7 [7 [ [7 [7 7 _ _ il9 ( 1341 99 I I [ 9 00 13482 O- [ [ 15.00 384.06 [7 [7 15.00 384.06 [ [ page 58 of 64 y used house,temporary structure before expiration, shared by other n_ _ L[ o ni o Attached table:18.1.IBD .ure | Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price [ 4.00 221.66 200.00 44,331.59 4.00 221.66 200.00 44,331.59 Oi 23.00 1,402.33 0] n 27.00 1,576.50 Oi Oi El 51.00 1,408.70 O F 52.00 1,516.38 Oi I 0 0i 16.00 623.43 298.77 186,265.24 16.00 623.43 298.77 186,265.24 613,776.38 3.00 281.72 O O 15.00 1,098.77 1,415.86 1,555,705.19 1,670,635.48 6.00 217.08 O [n 51.00 4,121.16 2,364.44 9,744,244.91 295362.8497 O 68.82 450.00 30,968.69 12.00 2,100.89 744.71 1,564,554.39 Oi Oi Ol Oi O O Oi Oi Oi Oi Oi OI Oi El El El Oi Oi Oi Li El Oi OI O Ol Ol O 47,820.70 Oi Oi O Oi 17.00 2,921.44 2,455.65 7,174,043.41 1,466,914.21 13.00 442.79 Oi El 81.00 8,239.61 2,089.55 17,217,098.73 216106.8113 6.00 167.31 350.00 58,559.72 34.00 4,355.03 666.42 2,902,292.64 572,445.54 8.00 246.45 48.00 11,830.22 86.00 13,343.50 2,227.66 29,724,765.87 911,301.81 15.00 436.59 204.50 89,282.39 225.00 26,060.62 2,030.69 52,921,013.37 237609.268 5.00 118.13 300.00 35,440.26 46.00 11,310.54 633.45 7,164,644.53 Oi Oi O El O El Oi Oi OL Oi Oi OL El Oi Oi El Li Oi O OL O O El O 1,184,406.64 8.00 115.87 Li Li 83.00 7,677.09 1,956.97 15,023,816.20 1,460,386.56 14.00 328.64 El n 143.00 12,482.21 1,558.99 19,459,615.74 383414.098 4.00 183.99 200.00 36,798.69 68.00 3,432.11 475.67 1,632,546.12 2,I&442A I9 nn 644-04 I R37 1 ,R302 201.00 25,040 0 2,135.65 65 __ _ 5,509,238.06 48.00 1,425.09 62.65 89,282.39 500.00 50,903.60 1,951.57 99,341,972.75 page 59 of 64 V used house,temporary structure before expiration, shared by other n__ _ [o [ [ o Attached table:18.1.IBD ;ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 1132493.027 15.00 538.26 300.54 161,767.36 160.00 21,198.57 625.70 13,264,037.68 [O [0 O 0 [l 2.00 45.18 3,730.23 168,548.08 4233.742324 0 [O [O O 0 6.51 650.00 4,233.74 IZ LI [7 [ [El[7 [7 [7 1 120,838.06 [O [ [7 [7 4.00 733.30 2,496.19 1,830,448.43 52,549.84 5.00 178.64 315.60 56,379.03 9.00 597.46 601.18 359,178.09 27617.19049 1.00 184.95 350.00 64,730.80 4.00 394.92 498.80 196,983.48 144,629.25 5.00 664.17 72.72 48,298.45 24.00 2,676.26 722.00 1,932,243.72 1,757,261.46 6.00 371.96 259.38 96,480.54 74.00 7,357.05 1,300.50 9,567,876.50 294663.0172 [7 82.71 300.00 24,813.37 2.00 2,934.37 599.91 1,760,361.57 [] 0 [0 [ [0 12.00 1,825.11 1,225.67 2,236,975.40 59,242.37 5.00 984.67 15.35 15,114.56 22.00 3,540.85 647.80 2,293,778.82 [O 0 375.12 200.00 75,023.93 [ 869.97 376.30 327,368.40 265,467.31 5.00 664.17 72.72 48,298.45 40.00 5,234.66 1,146.14 5,999,667.55 1,869,053.66 16.00 1,535.27 109.41 167,974.14 107.00 11,540.54 1,073.55 12,389,381.49 326513.95 1.00 642.78 256.03 164,568.10 6.00 4,205.77 544.24 2,288,947.19 o [L El n o n n o 37,228.17 [ [0 n o7 8.00 1,720.85 4,331.20 7,453,364.23 page 60 of 64 v used house,temporary structure before expiration, shared by other oI LI LI El oi on Attached table:18.1.1BD :ure ________ Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 20915.14084 0 0I OI 0 2.00 274.06 764.19 209,434.78 LI DI LI LI U, LI LI LI L LI LI LI LI LI El t] FLI LI El 2.00 512.53 O LI 2.00 512.53 LI El OI LI LI El L 12.00 1,014.66 3,042.82 3,087,432.28 = I LI LI El El 3.00 544.71 684.44 372,823.98 LI 1.00 13.32 300.00 3,997.35 14.00 582.90 1,379.26 803,971.72 56,382.66 LI LI El 0 23.00 2,087.21 1,934.47 4,037,657.93 El 1.00 1.69 300.00 507.07 4.00 739.26 627.63 463,978.25 El O1 O O O O - El O1 O 0 LI LI LI 0 12.00 1,118.44 1,848.53 2,067,469.43 LIL LI LI LI LI LILIL LI 3.00 525.86 7.60 3,997.35 28.00 2,213.88 1,297.02 2,871,441.14 93,610.84 OL 0 Ll LI 43.00 4,822.73 3,022.87 14.578,454.44 20915.14084 1.00 1.69 300.00 507.07 9.00 1,558.03 671.51 1,046,237.01 L 1.00 20.11 El El 6.00 165.69 1,102.36 182,651.80 449,400.45 2.00 13.32 LI LI 15.00 2,599.79 2,686.47 6,984,282.82 293209.2974 2.00 62.29 450.00 28,032.17 2.00 810.50 683.13 553,682.01 - - LI LI LI .=fl ~ ______ _____pa ° n_o-n n-n_o o_o ____f_64 page 61 of 64 y used house,temporary structure before expiration, shared by other n E [] o nG Attached table:18.1.IBD .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 0 1.00 266.41 O [n 3.00 692.87 1,583.34 1,097,042.20 267,813.03 . 1.00 128.36 350.00 44,926.86 27.00 4,691.74 2,213.27 10,384,079.74 69841.94992 O 6.83 350.00 2,391.70 6.00 1,214.09 640.12 777,163.43 O 4.00 332.89 232.54 77,409.63 10.00 821.80 1,107.91 910,482.49 2,221,957.78 10.00 1,271.23 63.77 81,062.32 72.00 12,910.50 1,072.48 13,846,204.13 330998.3231 3.00 439.68 300.00 131,903.99 9.00 4,560.75 581.90 2,653,906.68 U U U1 U U U U U U U 2.00 39.98 815.08 32,584.88 3.00 81.25 655.02 53,222.68 2,015,574.17 6.00 598.83 156.46 93,695.40 37.00 6,100.95 1,449.12 8,841,008.08 350760.708 U 219.45 200.00 43,889.73 2.00 1,988.39 435.07 865,091.51 O 8.00 659.39 166.81 109,994.50 22.00 1,761.61 1,273.49 2,243,399.16 4,954,745.43 19.00 2,011.75 109.20 219,684.58 151.00 26,302.97 1,522.85 40,055,574.78 1044810.278 5.00 728.26 283.17 206,217.60 19.00 8,573.73 565.66 4,849,843.63 U 1.00 96.91 450.00 43,610.13 1.00 96.91 450.00 43,610.13 U1 U U1 U1 Ul 5.00 1,058.53 2,539.04 2,687,645.58 U 1.00 2.94 450.00 1,322.53 2.00 266.11 763.87 203,272.41 U U U U U U U U U U U U U U U U U U U U U U U U U U U 19-662.50 2.00 110.47 O U 8. 360.92 449 1 162,101 14 _ _ __ U 1.00 9.23 U U 6.00 104.87 592.82 62,167.99 page 62 of 64 v used house,temporary structure before expiration, shared by other o] n] o] o] o] o] Attached table:18.1.lBD :ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price ] o n] r] El 2.00 175.39 650.00 114,004.88 O] 1.00 7.95 [ O] 15.00 601.70 562.85 338,665.80 356,272.96 O El O _ 20.00 1,295.43 1,389.22 1,799,643.15 39323.05211 2.00 33.81 300.00 10,143.08 4.00 597.14 573.74 342,603.55 F] El F] F] F] F] F] El_ t] F] El ] El El El F] F] F El O] O] O] O] 5.00 301.42 496.12 149,544.11 O] F O F O _ 6.00 195.19 508.62 99,275.60 - ] F Fn r rL r] 29.67 528.12 15,669.18 19,662.50 4.00 215.34 202.52 43,610.13 29.00 1,360.95 509.88 693,921.22 356,272.96 1.00 9.23 O I ] 37.00 2,654.01 1,751.59 4,648,732.32 39323.05211 3.00 36.75 312.00 11,465.61 8.00 1,068.31 632.35 675,550.02 613,776.38 5.00 398.74 109.37 43,610.13 22.00 1,361.37 1,308.95 1,781,967.12 2,157,264.10 8.00 230.40 0 0 81.00 9,545.52 2,832.54 27,038,085.62 613721.0303 3.00 134.05 450.00 60,323.39 18.00 3,458.07 733.12 2,535,177.34 188,321.26 5.00 889.42 I] n] 34.00 5,221.06 1,965.81 10,263,635.23 1,787,277.07 20.00 759.02 133.47 101,305.89 135.00 14,648.33 2,123.79 31,109,956.83 313565.9517 7.0(0 359.09 350.00 125,682.22 49.00 6,684.15 652.78 4,363,268.41 717_074.79 19.00 1.26479 illL9f 143L5365 -J14900 n AA026-6 ,870907 , _.59 5,303,176.67 31.00 2,079.78 128.29 266,825.26 414.00 49,710.81 1,653.01 82,172,395.08 page 63 of 64 y used house4temporary structure before expiration, shared by other O______ OZ 0J O OOAttached table:18.1.IBD .ure Simple structure Total l Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total pfice 902593.6604 11.00 676.03 300.00 202,807.77 65.00 20,142.06 614.91 12,385,494.57 O_E_ O_El Oi OI OO o U o o o o n o o o U o o o o o o o 1,184,406.64 10.00 155.84 209.09 32,584.88 115.00 11,003.31 1,775.01 19,531,027.81 3,535,203.10 25.00 1,912.14 56.90 108,809.97 208.00 22,319.20 1,375.21 30,693,678.25 734174.806 4.00 778.56 200.00 155,712.35 70.00 6,320.14 449.46 2,840,675.21 2,703,579.07 39.00 2,708.80 80.38 217,730.65 320.00 35,611.90 1,833.28 65,286,759.75 12,782,920.94 84.00 4,981.34 95.75 476,941.11 838.00 96,223.86 1,777.25 171,014,115.78 2564055.448 25.00 1,947.73 279.57 544,525.74 202.00 36,604.42 604.42 22,124,615.53 page 64 of 64 Cost estimate of compenstion for historically used house shared by other muni L I1 ElnLI II L n L I n1 L LI I L L Frame structure Composite structure Brick and timber stri Unit UJnit Unit Quantity Floor area pnce Total price Quantity Floor area-pnce Total price Quantity Floor area pric Grade I Total 8.00 119.30 800.00 95,443.03 23.00 1,619.33 750.00 1,214,499.52 10.00 1,790.60 650.00 LI Grade 2 Total I LI LI L LI LI LI LI LI LI L LI Grade 3 Total 6.00 977.74 700.00 684,415.04 28.00 1,382.00 650.00 898,302.48 21.00 1,419.61 550.00 historically used house Grade 4 Total 52.00 12,730.51 650.00 8,274,831.75 94.00 7,934.21 600.00 4,760,526.44 32.00 3,885.48 500.00 LI Grade 5 Total I I LI LI LI L1 LI I LI LI L] LI Grade 6 Total 24.00 3,025.39 550.00 1,663,966.40 54.00 3,448.89 500.00 1,724,447.26 19.00 3,736.42 400.00 Ll Subtotal Total 90.00 16,852.94 636.01 10,718,656.22 199.00 14,384.44 597.71 8,597,775.70 82.00 10,832.12 496.85 page 1 of 2 icipal for Datansha project (pipe network) n] nI [ F] [ n Attached table:18.1.2.4.1BD ucture Simple structure Total Total pnce Quantity Floor area Unit Total pnce Quantity Floor area Unit price Total price 1,163,891.99 2.00 138.14 450.00 62,163.46 43.00 3,667.38 2,650.00 2,535,998.01 [7 [7 [n L [n [7 [n [i 780,785.36 1.00 135.20 350.00 47,318.56 56.00 3,914.55 2,250.00 2,410,821.44 1,942,740.98 10.00 689.86 300.00 206,958.43 188.00 25,240.06 2,050.00 15,185,057.61 [ [1 [7 [7 [ [[ E [1 1,494,568.24 5.00 742.61 200.00 148,522.39 102.00 10,953.32 1,650.00 5,031,504.30 5,381,986.58 18.00 1,705.81 272.58 464,962.85 389.00 43,775.31 2,003.16 25,163,381.35 page 2 of 2 Cost estimate of compenstion for temporary relocation shared by ot: network) Quantity Floor area Unit price Grade I Partially demolished 51.00 4,121.16 20.00 C Grade 2 Partially demolished - - - Housing Grade 3 Partially demolished 81.00 8,239.61 16.00 Grade 4 Partially demolished 225.00 26,060.62 14.00 Grade 5 Partially demolished - - - Grade 6 Partially demolished 143.00 12,482.21 8.00 Subtotal 500.00 50,903.60 13.22 5 Grade I Partially demolished 2.00 45.18 140.00 Grade 2 Partially demolished - - r Shop Grade 3 Partially demolished 9.00 597.46 65.00 O Grade 4 Partially demolished 74.00 7,357.05 40.00 Grade 5 Partially demolished - - - Grade 6 Partially demolished 22.00 3,540.85 10.00 Subtotal 107.00 11,540.54 37.80 Grade I Partially demolished 8.00 1,720.85 80.00 Grade 2 Partially demolished _____ Of fice Grade 3 Partially demolished 12.00 1,014.66 48.00 Grade 4 Partially demolished 23.00 2,087.21 32.00 Grade 5 Partially demolished - - - House with Grade 6 Partially demolished .. - C Property Subtotal 43.00 4,822.73 45.40 residential Grade I Partially demolished 15.00 2,599.79 50.00 plot Grade 2 Partially demolished - - - Factory Grade 3 Partially demolished 27.00 4,691.74 30.00 building Grade 4 Partially demolished 72.00 12,910.50 20.00 Grade 5 Partially demolished _.______ Grade 6 Partially demolished 37.00 6,100.95 6.00 Subtotal 151.00 26,302.97 21.34 Grade I Partially demolished 5.00 1,058.53 20.00 Grade 2 Partially demolished - - other Grade 3 Partially demolished 6.00 104.87 20.00 use Grade 4 Partially demolished 20.00 1,295.43 20.00 Grade 5 Partially demolished - O_______ Grade 6 Partially demolished 6.00 195.19 20.00 Subtotal 37.00 2,654.01 20.00 Grade I Partially demolished 81.00 9,545.52 34.44 page 1 of 4 37 Grade 2 Partially demolished Total Grade 3 Partially demolished 135.00 14,648.33 25.09 m Grade 4 Partially demolished 414.00 49,710.81 20.98 Grade 5 Partially demolished - Grade 6 Partially demolished 208.00 22,319.20 8.20 Subtotal 838.00 96,223.86 19.77 page 2 of 4 her municipal for Datansha project (pipe Attached table:18.1.2.7.1.1.1BD O Monthly compensation Relocation period (month) Total n 82,423.15 6.00 494,538.88 n _____ ____ ____ 6.00 - F 131,833.77 6.00 791,002.64 O 364,848.67 6.00 2,189,092.05 O _ _ _ _ _ _ 6.00 - E 99,857.70 6.00 599,146.18 C 678,963.29 6.00 4,073,779.74 n 6,325.81 6.00 37,954.86 E _____ _____ _____ 6.00 - 38,834.59 6.00 233,007.52 D 294,282.08 6.00 1,765,692.47 O ____ ____ ____ ____ 6.00 - 35,408.53 6.00 212,451.16 O 374,851.00 6.00 2,249,106.01 E 137,668.26 6.00 826,009.54 O 6.00 - O 48,703.80 6.00 292,222.80 O 66,790.76 6.00 400,744.57 O _ _ _ _ _ 6.00 - O _ _ _ _ _ 6.00 - 253,162.82 6.00 1,518,976.92 D 129,989.73 6.00 779,938.38 O _ _ _ _ _ 6.00 - 140,752.07 6.00 844,512.40 m 258,209.96 6.00 1,549,259.73 O _ _ _ _ _ _ _ _ _ _ _ _ _ 6.00 - ,- 36,605.67 6.00 219,634.04 O 565,557.43 6.00 3,393,344.55 O 21,170.61 6.00 127,023.64 O _ _ _ _ _ 6.00 E- 2,097.36 6.00 12,584.18 ! 25,908.59 6.00 155,451.55 O _ _ _ _ 6.00 - 3,903.73 6.00 23,422.37 I 53,080.29 6.00 318,481.74 O 377,577.55 6.00 2,265,465.30 I page 3 of 4 6.00 G 362,221.59 6.00 2,173,329.53 1 1,010,040.06 6.00 6,060,240.37 L ____________ _ 16.00 - 3 175,775.62 6.00 1,054,653.75 _ 1,925,614.83 6.00 11,553,688.96 3 3 page 4 of 4 Cost estimate of compenstion for temporary structure before expiration shared by other munii [I F F] F D El F] F] HF F] F] [n F] El Frame structure Composite structure Brick and timber struc quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Grade 1 temporary demolished El F] 250.00 n] F] F] 250.00 C 1.00 6.51 250.00 Grade 2 temporary demolished F] 1F 250.00 F] F] F] 250.00 F] F] F] 250.00 Grade 3 temporary demolished F] F] 250.00, F F] F] 250.00 F F F 250.00 E Commercial Grade4 temporary demolished 3.00 180.10 250.00 45,024.14 1.00 31.59 250.00 7,897.63 2.00 56.25 250.00 C Grade 5 temporary demolished F] F] 250.00 F] F] F] 250.00 F] F] F] 250.00 E Grade 6 temporary demolished F F] 250.00 F] F] F] 250.00 F F F 250.00 Subtotal 3.00 180.10 250.00 45,024.14 1.00 31.59 250.00 7,897.63 3.00 62.76 250.00 Frame structure Composite structure Brick and timber struc quantity Floor area Unit price| Total price quantity Floor area Unit price Total price quantity Floor area Unit price Grade I temporary demolished 1.00 111.51 250.00 27,878.61 F F] 250.00 F] F] F] 250.00 Grade 2 temporary demolished F F] 250.00 F] 0 F F 250.00 F F F 250.00 E Grade3 temporary demolished C] F] 250.00 F 1.00 40.11 250.00 10,026.33 F 0F] 250.00 C u°sther Grade 4 temporary demolished 4.00 201.42 250.00 50,355.54 1.00 157.92 250.00 39,479.46 4.00 56.71 250.00 C Grade 5 temporary demolished F1 F] 250.00 F] F F] 250.00 |] F] F] 250.00 r Grade 6 temporary demolished 3.00 169.46 250.00 42,363.86 1.00 53.06 250.00 13,265.94 1.00 15.02 250.00 Subtotal 8.00 482.39 250.00 120,598.00 3.00, 251.09 250.00 62,771.73 5.00 71.73 250.00 I _ _ 2 __ _ cipal for Datansha project (pipe network) n V] n [] o Attached table:18.1.2.7.1.IBD-l ture Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 1,628.36 V [1 250.00 V 1.00 6.51 250.00 1,628.36 [] V El 250.00 F V V 250.00 0 E] 1.00 12.65 250.00 3,162.83 1.00 12.65 250.00 3,162.83 14,061.82 2.00 52.31 250.00 13,077.58 8.00 320.24 250.00 80,061.18 ___ V i0 250.00 [] E [] 250.00 _ _ 3.00 342.48 250.00 85,619.83 3.00 342.48 250.00 85,619.83 15,690.19 6.00 407.44 250.00 101,860.25 13.00 681.89 250.00 170,472.20 Attached table:18.1.2.7.1.1BD-2 ture Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price V1 1.00 26.55 250.00 6,636.48 2.00 138.06 250.00 34,515.09 V1 V V 250.00 V V V 250.00 V V 1.00 13.75 250.00 3,437.82 2.00 53.86 250.00 13,464.15 14,176.51 6.00 357.20 250.00 89,300.99 15.00 773.25 250.00 193,312.50 V1 V] V 250.00 V V V 250.00 V 3,755.87 2.00 15.86 250.00 3,965.58 7.00 253.40 250.00 63,351.25 17,932.38 10.00 413.36 250.00 103,340.88 26.00 1,218.57 250.00 304,642.99 _ ~ _ 8311-B Flower Ave. Takoma Park, MD 20912 Mileage Plus No. 03119132141 September 23, 2004 United Mileage Plus P.O. Box 28870 Tuscon, AZ 85726 Attn: Retro Credit. Rejection of Mileage for Ticket 01610625896865 (United Mileage Plus No. 03119132141) Dear Sir or Madam: Today I spoke with one of your Customer Service Reps. and she advised me to send a copy of my boarding pass to prove that this ticket was not refunded and that I actually flew from Washington/Dulles-Chicago-Beijing on June 21, 2004. I have no idea why this ticket is showing up as refunded but I am attaching a copy of it as well as my boarding passes (Washington/Dulles-Chicago-Beijing). Thank you for looking into this matter. Sincerely, Anne Harrison I Cost estimate of compenstion for temporary relocation shared by other network) l O O 5 O O O O quantity Floor area Unit price Grade I temporary demolished 12.00 2,100.89 20.00 Grade 2 temporary demolished - - - . Grade 3 temporary demolished 34.00 4,355.03 16.00 HousingI Grade 4 temporary demolished 46.00 11,310.54 14.00 Grade 5 temporary demolished - - - Grade 6 temporary demolished 68.00 3,432.11 8.00 Subtotal 160.00 21,198.57 12.93 3 Grade I temporary demolished - 6.51 140.00 3 Grade 2 temporary demolished - - - El Shop Grade 3 temporary demolished 4.00 394.92 65.00 O Grade 4 temporary demolished 2.00 2,934.37 40.00 Grade 5 temporary demolished - - - Grade 6 temporary demolished - 869.97 10.00 r Subtotal 6.00 4,205.77 40.16 Grade I temporary demolished 2.00 274.06 80.00 Grade 2 Area of land borrowed - - - Grade 3 Area of land borrowed 3.00 544.71 48.00 Office K Grade 4 Area of land borrowed 4.00 739.26 32.00 Grade 5 Area of land borrowed - - - b House with Grade 6 Area of land borrowed - - - Property Subtotal 9.00 1,558.03 46.06 right and on C residential Grade I Area of land borrowed 2.00 810.50 50.00 plot Grade 2 Area of land borrowed - - - Factory Grade 3 Area of land borrowed 6.00 1,214.09 30.00 building Grade 4 Area of land borrowed 9.00 4,560.75 20.00 5 Grade 5 Area of land borrowed - - - O Grade 6 Area of land borrowed 2.00 1,988.39 6.00 C Subtotal 19.00 8,573.73 20.77 Grade 1 Area of land borrowed 2.00 266.11 20.00 Grade 2 Area of land borrowed . - - K other Grade 3 Area of land borrowed 2.00 175.39 20.00 use Grade 4 Area of land borrowed 4.00 597.14 20.00 Grade 5 Area of land borrowed - - - Grade 6 Area of land borrowed - 29.67 20.00 l Subtotal 8.00 1,068.31 20.00 Grade I Area of land borrowed 18.00 3,458.07 34.09 page 1 of 4 Grade 2 Area of land borrowed | | | Total Grade 3 Area of land borrowed 49.00 6,684.15 25.69 Grade 4 Area of land borrowed 65.00 20,142.06 21.31 Grade 5 Area of land borrowed - - - FGrade 6 Area of land borrowed 70.00 6,320.14 7.96 Total 202.00 36,604.42 19.68 page 2 of 4 municipal for Datansha project (pipe E Attached table:18.1.2.7.1.2.1BD Monthly compensation Relocation period Total _______ ______ ______(m onth) 42,017.77 6.00 252,106.65 1 6.00 - 69,680.54 6.00 418,083.22 158,347.53 6.00 950,085.19 6.00 - 27,456.87 6.00 164,741.25 297,502.72 6.00 1,785,016.30 911.88 6.00 5,471.30 _________________ 6.00 - 25,669.58 6.00 154,017.48 117,374.97 6.00 704,249.82 ____ ___ ___ ___ 6.00 - 8,699.70 6.00 52,198.21 152,656.14 6.00 915,936.81 21,924.78 6.00 131,548.66 6.00 - 26,146.18 6.00 156,877.07 23,656.20 6.00 141,937.18 6.00 l 6.00 - 71,727.15 6.00 430,362.91 40,525.22 6.00 243,151.31 ___ __ __ __ __ __ 6.00 36,422.79 6.00 218,536.74 91,214.91 6.00 547,289.47 6.00 - 11,930.34 6.00 71,582.06 180,093.26 6.00 1,080,559.58 5,322.15 6.00 31,932.90 - ~~6.00 - 3,507.84 6.00 21,047.05 11,942.90 6.00 71,657.39 6.00 - 593.40 6.00 3,560.40 21,366.29 6.00 128,197.74 110,701.80 6.00 664,210.81 page 3 of 4 L 6.00 I 161,426.93 6.00 968,561.57 402,536.51 6.00 2,415,219.05 1 6.00 - 48,680.32 6.00 292,081.91 723,345.56 6.00 4,340,073.34 page 4 of 4 Cost estimate of cost for rehabilitation of partially affected house with Property right shared by o Fn F] n n n F] u] n n ] n] F F] n nn Frame structure Composite structure Brick and timber structure Quantity Floor area Unit price Total price Quantity Floor area Unit pfice Total pnce Quantity Floor area Unit price Total price repaired _ _ _ __repaired __ _ _ _ _ _ _ _ _ _ _ _ _ _ repaired _ _ _ __ _ _ _ _ _ Grade I 1.00 1,392.35 100.00 139,234.96 6.00 508.20 120.00 60,984.12 1.00 245.31 150.00 36,795.78 F] Grade 2 n] F] 100.00 F1 ] F] 120.00 F] ] El 150.00 F] Fl house with Grade 3 7.00 498.64 100.00 49,864.13 8.00 1,222.30 120.00 146,676.11 4.00 185.94 150.00 27,891.41 [ Property right Grade 4 3.00 197.93 100.00 19,792.77 9.00 1,128.93 120.00 135,471.66 4.00 170.27 150.00 25,539.77 L] Grade 5 F] F 100.00 F] F] F1 120.00 F] [ F] 150.00 [] F] _________ Grade 6 6.00 311.78 100.00 31,177.61 14.00 823.17 120.00 98,780.79 5.00 501.12 150.00 75,168.27 F] Subtcotal 17.00 2,400.69 100.00 240,069.46 37.00 3,682.61 120.00 441,912.68 14.00 1,102.63 150.00 165,395.22 page 1 of 2 ther municipal for Datansha project (pipe network) n] El n] F 1n Attached table:18.1.2.8.1BD Simple structure Total Quantity repdared Unit price Total price Quantity Floor area Unit price Total price O________ O 60.00 O 8.00 2,145.86 Ol 237,014.86 OZ O 60.00 O_ 0 _ O [ L 60.00 O 19.00 1,906.88 O 224,431.64 [1 O 60.00 El 16.00 1,497.12 [1 180,804.19 O] O 60.00 EO 0 O_ O] _ __ O 60.00 O 28.00 1,760.12 L1 205,126.66 l P I n 1 60.00 P1 71.00 7,309.99 1P 847,377.36 page 2 of 2 Cost estimate of compenstion for stop-loss shared by other municipal for Datansha project (pipe network) Attached table 18.3.2.10.1BD-1 Use Type Total floor Unit price Total price area Grade 1 Shop Partially but permanently affected 35.94 168.00 6,037.54 Grade 2 Shop Partially but pernanently affected 120.00 3,560.33 Grade 3 Shop Partially but pernanently affected 44.50 80.00 3,560.33 Grade 4 Shop Partially but permanently affected 3,110.66 50.00 155,532.94 Grade 6 Shop Partially but permanently affected 25.00 - Grade 6 Shop Partially but permanently affected 465.40 15.00 6,981.05 Grade1 Office ParSubtotal 3,656.50 172,111.87 Grade 1 Office Partially but permanently affected 1,587.04 96.00 152,355.59 Grade 2 Office Partially but permanently affected 70.00 - Datansha Grade 3 Office Partially but permanently affected 935.84 50.00 46,792.15 project Grade 4 Office Partially but permanently affected 1,240.83 32.00 39,706.69 Grade 5 Office Partially but pernanently affected 20.00 - Grade 6 Office Partially but permanently affected 550.42 12.00 6,605.04 _____________ G F l Subtotal 4,314.13 .01 60.00 1245,459.47 Grade 1 Factory building Partially but permanently affected 2,501.01 60.00 150,060.75 Grade 2 Factory building Partially but permanently affected 48.00 - Grade 3 Factory building Partially but permanently affected 3,670.91 36.00 132,152.67 Grade 4 Factory building Partially but permanently affected 4,334.65 24.00 104,031.67 Grade 5 Factory building Partially but pernanently affected 3,732.4 14.00 - _________ rade 6 Factory building Partially but permanently affected 3,732.04 7.00 26,124.25 Subtotal 14,238.61 412,369.34 Total 22,209.25 ______ 829,940.68 Cost estimate of compenstion for stop-loss shared by other municipal for Datansha project (pipe network) Attached table:18.3.2.10.1.1BD-2 Use Type Total floor Unit price Total price area Grade I Shop Temporarily affected 168.00 _ Grade 2 Shop Temporarily affected 120.00 . _ Grade 3 Shop Temporarily affected 139.63 80.00 11,170. 2 Grade 4 Shop Temporarily affected 1,447.56 50.00 72,378. Grade 5 Shop Temporarily affected 25.00 _ Grade 6 Shop Temporarily affected 340.87 15.00 5,113. D Subtotal 1,928.06 88,661. 6 Grade I Office Temporarily affected 96.00 _ Grade 2 Office Temporarily affected 70.00 . _ Datansha Grade 3 Office Temporarily affected 521.29 50.00 26,064. 31 project Grade 4 Office Temporarily affected 456.98 32.00 14,623. 40 Grade 5 Office Temporarily affected 20.00 Grade 6 Office Temporarily affected 12.00 Subtotal 978.27 40,687. 71 Grade 1 Factory building or warehouse Temporarily affected 457.11 60.00 27.426. 2 Grade 2 Factory building or warehouse Temporarily affected 48.00 Grade 3 Factory building or warehouse Temporarily affected 1,084.23 36.00 39,032. 43 Grade 4 Factory building or warehouse Temporarily affected 1,342.39 24.00 32,217. 33 Grade 5 Factory building or warehouse Temporarily affected 14.00 _ Grade 6 Factory building or warehouse Temporarily affected 1,002.36 7.00 7,016. 54 Subtotal 3,886.10 105,693. 12 Total 6,792.43 235,042.48 Cost estimate of compenstion for business loss due to relocation shared by other municipal for Datansha project (pipe network) Attached table:18. 3. 2. 10. 2. BD Use Type Total floor area Unit price Total price Grade 1 Shop Wholly and permanently affected ________________ 840.00 Grade 2 Shop Wholly and permanently affected 690.00 _ Datansha Grade 3 Shop Wholly and permanently affected 724.36 560.00 405,642.52 project Grade 4 Shop Wholly and permanently affected 550.01 450.00 247,504.9' Grade 5 Shop Wholly and permanently affected 350.00 _ Grade 6 Shop Wholly and permanently affected 1,538.40 270.00 415,368.92 Subtotal 2,812.78 | 1,068,516.43 I Cost estimate of cost for pipe relocation shared by other municipal for Attached tablel 18.3.2.13.1BD Cost Project Type of pipe Mateopi Diameter/section Nuber of Quantity Total length Unit I share* of pipe cores/size BD jtp pEf(4_q) W 600xlOO 64L El 2 BD _ff i4' PWM(f ) D 1200x200 16?L D I BD t !iP ' P tEA(L *) C 10Ox100 l?L _ __ 1_ BD 7tig PFf( f) 1 200x1002?L _ 1 _ BD T 7tV P*.{9(T-L) 200x200 4?L EI 1 BD )TT-'7 P*M(T-L) 300xl0O 3?L 1 = BD 7T2 F' PtEM(T-L) t_ 300x200 6+L 1 _I BD )ZIge Ptf{,(T-L) 5oox200 10?L D 1 = BD ThV PV(N A,r) TF 300x200 6L El 1I BD 7 PEtt(49Ml!) I 1ooox2006L I-I 1 BD t:UtV Pp *htM(rK 4 v) q lOOOx800 24?L D1I BD ti P q j@ (N j P) 200x1002fL I 1 BD )I2d$' p)7 300x200 p = BD t!t$' Pt(4@j~P lq A) 300x200 6TL 5 5 _ BD F4 3 tiE61 PqM(4VAqk,) W 400x300 o 3 _ BD tE ?,I P*-M(Nql') 5 5oox300 16RL o_ _ I BD TF- $' P*IM(N4Al) O soox3008sL 1I BD )4 R T7' P dh q(rOiqAj) O 5oox400 12RL K I _t BD T) F 3 t$' P~E q (N M XJj) 4 600x4006L _ 1 BD )ttF P*IM(Wfl A) 600x5oo 24?L o 3 = BD 7i'¸J' p17( J ) P 800x1000 22KL 1 _- .T .l _ BD )Z- T7 P*-,M(49MIA) 8oox5oo 40OR o 2 BD t: W P ___________ 800x600 50oL o 2 = BD )dW-' P? h (N@ q ,MM) ElK O 7 _ BD )tFfi 't PqM(r*j J.2) J 700x700 244L o 1 I BD TT P*{t(NMqA) 20x300 E I _5 __t BD t09? P___(______) O 700x450 32TL 1 = BD tiote ) 10 lOx1001L 5 1 BD )t l4''9' ) _ _ 300x200 E Pq'M(42T, )+L BD 3tZJt4' ) t 300x250 8?L 1l BD ttR ?d ) __ 400xlOO 1 BD tUI' ) 400x1004+L oR BD )tCR t¸ ) 400x300 o BD tR¸i ) " 400x300 12TL K BD )Ji¸' ) t 600x5oo 24TL o page 1 of 12 I Cost estimate of cost for pipe relocation shared by other municipal for Attached tablel 18.3.2.13.1Bp Choset Project Type of pipe Mateoial Diaseteresection | o Quantity Total length Unit I BD Pt {-( )1L V 200x 100 El 1 BD 1J )_ 2RL 1 BD 7 51 200x 100 3.53 L 67.12 BD t -O ; * ('& 200x200 C 3 189.21 214.17 BD FtTJ C;r(e-i) 300x 100 O 1 4.81 14.17 RD W ______i_t_ E_( _ 300x200 C 4 128.00 89.11 RD TC*F tt~(E ) 300x300 E 1 38.99 17.73 BD t«itJ* a t (p 400xlO0 V 1 15.37 14.17 BD . ____ _ 900x700 C 1 103.94 1, 18.89 BD 0 E 0 10 952.02 BD -tt tO(O) lOOOx200 3 2 18.99 61.83 RD tJF 1M 000i) lOOOx800 C 2 175.37 1, 1i8.89 RD 77 TT(PO lOOxO V100 3 17.39 67.12 BD rTE! t@('R) l1OOx700 3 3 234.95 1 18.89 BD -TT3 Im O& 1200x700 V 3 146.68 1, 18.89 BD T i' ET (d) 1300x400 O 1 61.46 1, 41.32 RD -TiT7 200xlO0 V 9 148.90 .67.12 BD )Q t{(s0) 200x200 V 2 132.25 : !14.17 BD TiT l' t*{(Q ) 250x300 1 37.06 : 89.11 RD -TTW t? 4(7) 300x 100 1 27.09 . 14.17 RD E ' 300x200 3 22 938.24 89.11 BD TQt'F ( 300x250 V 2 56.09 _ 89. 11 BD _T77 EM(IW 300x300 V 2 123.64 17.73 RD .TY ' Ww ) 400x100 V 2 15.94 , 14.17 RD *M _________)___ 400x200 3 51.85 1 56.03 BD t (P& Q -I) 7U 400x250 V 1 65.72 156.03 RD CgMd _________) 400x300 V 18 1,281.43 46.97 BD MTfl6" ________) _ 400x500 3 1 49.80 _ 61.83 RD - T 0'hM(`ftJ) C. 500x200 G 5 256.53 _ 17.73 BD )UMV ____(___)_ 500x300 V 11 830.70 . 60.28 BD *T T-' ("a d) 500x400 V 4 112.89 _ 61.83 RD d _________) _ _ 5600x150V 1 32.48 1, 18.89 BD )-P ____(____)__ 600x1OO V 2 8.67 89.11 BD -TF-77 *TMOw Qt) 600x200 1 7.54 446.97 RD tQi6 * l( ) 600x300 1 78.93 _ 61.83 BD t ~T- e 600x400 5 331.13 1 _ 79.94 BD tqT?F ( 600x500 V 7 345.65 S 29.80 RD TEdF' ht~(* ) (16 700x500 V 4 293.39 RD tk*g Ehl(M ) 800xl000 V 2 41.06 1, 18.89 BD UMT1' Lh@(P-) 800x400 V 3 165.01 1, 72.54 BD I )tE ?,,I 800x500 V 3 87.571 1, 41.32 page 2 of 12 Cost estimate of cost for pipe relocation shared by other municipal for Attached tablel 18.3.2.13.1BD shtre Project Type of pipe Motferi Diameter/section cores/srze Quantity Total length Unit 1 BD * $' qh¢(S) 800x600 C 5 322.92 1,412.32 RD -ThT _________ 300x300 3 1 47.79 BD Zt9' ___t (k@) _4 t 700x700 El 2 118.11 BD r)' EgM(0 Lt) 3 3 31.39 BD )T1 ________ 3 1200x200 li 1 1.80 BD .1 k 3 200x300 3I 2 111.97 289.11 BD JZ:L-9 ? t¢ ) 3i 300xlO0 El 2 10.00 BD -TT-77 El 300x300 3i 1 23.02 RD )T t U Gi 400x300 L 3 263.83 RD )ZRi$T E T(FF ) Ci 500x400 3i 1 56.27 BD E t(AQt) L 700x500 1 16.94 225 8,614.31 BD )dQ¸$' r) 1200xlO00 C 1 BD 7-9 PELJ( LT) 3 -C 3 O RD IT$' P tFJJ(OIO ) O l 0OOx800 El 2 RD -Y P (8 ) W 1200x 1000 3 BD J F P ? h iJ (49iMJF,i) 1200x300 3l 3 BD ,Ti' P i (49 iNA) 1200x300 16fL El 1 BD I P___J ____ 1200x400 3i 1 BD )TR P(9 t, PW Eh0x0 _ _JJ ( _) __1200x6 1_ BD ) F I' Pqkj)J ( A) 1230x100 1 BD i-W P__________ 1230x1000 Gi 6 RD ' p (8} ) W 1300x 1000 7 RD )ZTiX ' P3qJ(Nq,A) 1300x1300 1 RD )T7 1500x120R tL4 P _____) 1500x1200 4 BD P*Fi PEj(N ) 2300x1200 5 1I BD TJ' F P (N UIJ A) 300x500 C 1I RD *ffi2$' P IJ(N FtA) $ 400x400 4 BD PT IW Pe(4 MF ) $ 410x500 3 1 RD ' P*0J(Ir$iKA) z 680x350 Li 1 RD *'- 7- Pqt(r*XqP,) $ 80 3 1 RD T~T' PTE(i(N m,!A) $ 800x400 3 1 BD *fl ?$' PqEj(rKMfqj,) 800x500 2 RD *Ffii$' PEht(S@lj,i) ~820x500 14 RD T*F PE(4@$i) $ 900x300 12fL _ 1 BD _ W $ 5 BD )T3TS P t)(S$i!U)i) O 1300xlO00 1 P*IMVW#< AR 1 BD *-O ?-' ) $_ 2100x600 O 1. PCht(-V# ATL BD *'I1' ) 300x120 2?L i 1 page 3 of 12 Cost estimate of cost for pipe relocation shared by other municipal for Attached tablel 18.3.2.13.1BDi share* Project Type of pipe Matoal Diameter/section Nbr of Quantity Total length Unit I BD t«i' )_ _ _ 300x300 4T 1 BD XJEt ) i 400x400 E 1 BD tit _ _ ) _ _ 800x400 1 BD t*F tt(W) _0 D 19 1,069.67 1, 57.38 BD W-Mw d) ( 1000xlO00 I_ 1 45.11 1, 74.52 ED tEiF$ f.jJj(e) lOOOx800 _________ 7 947.83 1, 74.52 ED tti$' tt(W0) i14 l lOOxl1100 L 1 104.56 1, 74.52 BD FTT t)JQ-0) 14 1200xl000 El 11 873.11 1, 57.38 BD *;k V ti-(t) 1200x1100 __ 4 127.10 1, 57.38 BD - O ty(9) & 1200x300 D 3 431.50 1, 50.00 BD 7 W 1i00 __(__200x400_El 1 284.85 1, 50.00 BD )z i 90 (e) W 1200x600 El 1 218.31 50.00 BD )ZitU' _ _t(_ __) 1230xlOO O 2 3.81 = 93.79 BD 7TW F ? i g( ) 1230xlOOO C 15 814.06 1, 57.38 BD jTl ty1j (e) 1300xIOOO C 8 448.39 1, 57.38 BD i t (le( ) 1300x1300 O 2 24.85 1, 57.38 BD t F ' jJ(W ) W 1300x5OO O 1 13.24 1, 50.00 ED t ty t t(e) l5OOx1200 O 4 140.15 1,' 57.38 ED 77 - iSS(O _) _ _ __oX_O_ 1 51.74 51.20 ED TT tt( ) 2100x600 O 2 36.29 S 18.60 BD ttU' t (}jq9 ) 2300x1200 O 2 3.63 3,1,14.80 BD 2 E Tf.- 300xl20 K 3 59.13 443.40 BD 3T7 tj(e) 300x300 K 3 44.40 443.40 ED dF ) 300x350 1 12.84 443.40 ED - T7D Tx(le ) 300x500 o 1 90.70 443.40 BD 't]' Et jJ -t( ) 400x400 E 14 1,219.86 45s9.83 BD V:IE61' t ( -) 400x500 G 1 114.97 45s9.83 BD * tj(Qd) 400x600 o 2 257.10 4 9.83 ED t2!2>1 E )( d) 77 410x50o E 1 19.97 4 9.83 BD *FfM ii(fi) 450x300 E 2 114.50 443.40 BD * /2QW0) 650x300 O 1 263.06 44 3.40 BD tT F E1 (d) 680x300 O 1 64.45 44 3.40 ED T - i -kt) 68ox350 K 2 97.07 4 43.40 BD *TZlF kJQ ( ) 700x400 K 1 74.11 4 3.40 BD t 'iH Ji( w) I 700x700 El 1 56.18 3.40 BD T W7 tDJ (w ) 80 G 3 26.60 6 5.42 BD *ff 7- d) 800x400 K 5 274.48 6 5.42 ED ~TTS t jQ (X) 800x500 Kl 3 74.29 6 5.42 BD I I J ±(JQ ) 800x600 K 1 15.57 6 5.42 BD I F iw tV (I§h ) 820x5OO K 9 906.01 6 25.42 page 4 of 12 Cost estimate of cost for pipe relocation shared by other municipal for Attached tablel 18.3.2.13.1BD Cost Project Typeofpipe Material Dianeter/section uber of Quantity Total length Unit 1 share* Diamtersecion cores/size BD tiEJ93' Ft1Jj (jI) 820x600 D 1 7.66 _ 525.42 BD -T _________ ___ ____ 900x300 O 2 16.92 W3.40 BD F t§(s;) O 1300xlO00 Z 1 30.31 1, 557.38 iJ'aKt 216 9,478.35 BD )tJ')4' f1) 150 O___ BD tJi1 r1) 300 1 BD T i$' Pg*7 !(49!J ) 1W 1200 Z 2 5, o00.0o BD W;yB1 P 7k(i A .... ) 400 O _I 1 BD -TTH P7 (N!j ) W 600 O 1 2, 360.00 BD 7tS Pe7k((7 &) W i 1 _A__A)150 RD 9t20t' Pe7kWilJ ;) % 100 O 6 = BD PT M P*7((i«Kj) Wf 150 o 16 _ BD t;F$' Pi7J(N(4 Aj) -W 200 c 2 ________ RD -TT-9 Pi7j((4qA() $W 300 C1 17 = BD t2!TE Pe7(RA) SWf 400 K 5 . BD ) PJ 7j( ,rS) 600 ° 1 - 2, 60.00 IT *T Pi7*(OM!) $W 100 7 _ BD *iE'V UY PiA((t * ) IiW 100 1 = BD -TTMT P.7,(44 600 O 1 - 2, 60.00 RD TFT j7 PTTA(M4t) t 200 O 1 . BD T'T$ Pe7J((#) f 100 O 3 = I RD T F 3 Pe7j(W4) T 150 o 2 _ RD TW-UP PA7W(V4 ) W 200 1 RD T FT Pv7j((4F) 400 G 2 = BD tiF PIT9(5!,) l 19 O 2 . RD TFi-9 U PTATR(4R!1T) - 219 O 1 890.00 RD TFTiT PTTAk(TY!!jj5) 3" 273 O 6 - 1, 20.00 BD tZ:0-91? P_____(_l`_J) _ _ 57 I 120.00 RD t Ft PA(4kMq) 1 325 C 2 1,: 70.00 BD TPT7' P;%jk((NMqAJ) 57 5 O 2 RD 7tF __ _ __ _ _ 76 1 - 10.00 BD 7TL F? PM`E( $IJU,) 1r 108 O 1 - 60.00 RD T_i?T P;^(4@1) 3 219 O 5 - 90.00 RD T tIt-A pt Iff) 45 O9 : 20.00 RD T~f PT)X (iF j) 1 W 1- 57 F ] I 20.00 BD i __________ 76 K 5 : _ 10.00 RD t«iT P(4@ii!S) lW 89 K 2 . 10.00 RD T7'y pM(&ft) 57 K 1 _ RD )kJi¸P 07J(QR) 1200 K 6 471.25 5, 00.00 BD e j7k(;R) 300 K 1 64.97 1, 20.00 BD &tV li f7J(Q -) _ 400 K 2 173.76 1,' 50.00 page 5 of 12 Cost estimate of cost for pipe relocation shared by other municipal for Attached tablel 18.3.2.13.1BD E Cost Project Type of pipe of pipe Diameter/section ores/s o Quantity Total length Uni: I share* o iecrssz BD FTT3' e7k(laR) 600 T L 5 132.35 2, 60.00 BD -TTh7' eA7k(Q ) 800 L 3 224.91 3, 00.00 BD )t:iH.i ,'> i-(QR) 900 1 31.61 3, 700.00 RD *T UTY eiJk(Q ) w 1200 E 10 1,351.79 5, 500.00 RD -T7d ?7 Q(jR) 1800 El 5 825.22 9, .00 B J7A2I' e7J(Qt) 15 01o ( 1 165.53 30.00 BD Z'JB - 7J(( ) 150 El 1 11.02 _ 70.00 BD 7W e7J((R) 200 2 16.04 560.00 BD T: e7J(QR) 400 3 203.07 1, 50.00 BD )d0i01- e7J((R) 10 52 2,026.72 _ 80.00 BD dfJtV V7f( V) 1200 4 308.56 5, .00. BD ikJeiiRJ-3 ~7J(QR) W150 47 2,511.21 570.00 BD T7' k7(W iQ ) 200 32 1,528.92 560.00 BD )d't¸' e7k(( ) 2100 1 126.72 9, 00.00 BD i (A(Q R) WW 250 2 288.28 90.00 BD -TT7 er e7j(Q ) 300 57 2,739.19 90.00 BD T E-9 7 - 7 (( ) 400 D 27 1,398.66 1, 50.00 BD tdiRt l, 7J('R) 600 O 4 232.38 2, 60.00 BD ) 't;i3 7Jq(s ) 600 D 3 426.05 2, 60.00 BD dT F m&,7j(Wf) 1200 D 2 289.87 5, 00.00 BD tWJ ; g*(e) 800 O 1 91.14 3, 00.00 BD FTTi TˇN IkQ 0) 159 O 2 353.23 62.09 BD t -t$' I k'W tt) 03 219 1 17.76 _ 90.00 BD -TUMT Iˇ1kWt() 273 4 489.60 1 , 20.00 BD ~TiRtV <(W) 108 O 8 502.72 - 60.00 BD *t't3' ;Xt( 159 O 1 42.54 _ 70.00 BD t l ft) 219 3 242.28 390.00 BD *'M' ;A6v(f) 325 3 155.61 1, 70.00 BD -TT _;_________ 426 O 1 254.83 1, 00.00 BD t3g t ( 57 C 4 211.20 _ 20.00 BD Fk , l( _ 76 ] 2 124.36 _ 10.00 BD T M,7 ( (0) 108 7 1 219.06 _ _60.00 RD T- -(,T) 219 O 5 638.38 _ 90.00 BD Ft 1 ' tt) 45 z 5 226.41 20.00 RD -'TLT 7- t) 57 6 281.79 220.00 BD TYi7; 'E(w ) "3R 76 O 3 134.08 310.00 BD :TY'7- wi(f) WW 89 2 163.87 310.00 ,J'Ht I I I I434 19,696.97 BD-f 875 37,789.63 page 6 of 12 Datansha project (pipe network) Unit 2 Unit 3 Total Remark 10,762.40 21,524.80 10,762.40 10,762.40 page 7 of 12 Datansha project (pipe network) Unit 2 Unit 3 Total Remark 91.81 914.02 91.81 92,639.53 91.81 1,472.47 91.81 84,011.33 91.81 19,866.96 183.62 6,113.91 91.81 177,814.26 59.26 14,819.77 59.26 304,681.95 59.26 5,998.11 59.26 422,133.73 59.26 263,535.38 59.26 79,939.10 59.26 104,300.93 59.26 43,998.65 59.26 12,911.42 59.26 7,407.25 59.26 1,494,449.76 59.26 22,864.05 59.26 66,302.00 59.26 5,303.69 59.26 27,675.44 59.26 27,290.87 59.26 1,939,629.63 59.26 35,910.57 59.26 183,169.81 59.26 1,006,926.29 59.26 101,470.63 59.26 54,499.43 59.26 3,535.24 59.26 3,814.91 59.26 56,918.23 59.26 356,372.48 59.26 464,772.19 59.26 71,342.83 59.26 206,309.21] 59.26 _ 124,271.951 page 8 of 12 Datansha project (pipe network) Unit 2 Unit 3 Total Remark 59.26 551,752.87 91.81 52,933.56 I _________ _ 18,532,361.62 .pa 9 of_1 page 9 of 12 Datansha project (pipe network) Unit 2 Unit 3 Total Remark 679.14 15,468,519.63 _ 679.14 79,107.10 679.14 5,524,398.83 679.14 183,359.18 679.14 7,882,379.72 679.14 543,215.12 679.14 1,332,217.13 679.14 492,536.88 679.14 377,493.74 679.14 7,820.32 679.14 9,560,659.95 679.14 3,134,461.98 679.14 72,454.15 679.14 22,889.66 679.14 598,981.95 340.00 20,240.81 1,358.28 131,929.04 679.14 16,237.28 679.14 146,687.56 679.14 110,139.45 679.14 14,413.19 679.14 101,813.93 679.14 12,159,347.96 679.14 130,948.52 679.14 467,427.90 679.14 22,750.01 679.14 206,295.60 679.14 295,295.37 679.14 72,350.62 679.14 174,880.97 679.14 83,190.54 679.14 63,065.31 679.14 70,821.93 679.14 1,103,705.23 679.14 197,812.40 679.14 20,310.11 l 679.14 1 .6,104,389.49 page 10 of 12 Datansha project (pipe network) Unit 2 Unit 3 Total Remark 679.14 9,988.55 679.14 30,490.46 679.14 67,788.92 67,102,816.50 X1~~ D 2,638,999.55 66,267.87 269,332.34 _ page 11 of 12 Datansha project (pipe network) Unit 2 Unit 3 Total Remark ______ _____ _____ _____312,342.04 _ _ _ ____________ ___________ 1 697,231.97 I__________ 1_______ _ 116,949.97 I_____ _____ ______ _ 7,570,047.07 I_________ 1 7,426,970.37 ____________87,733.02 l ________ _ l6,281.51 ____________10,586.00 _ _ _ _________ _ 1 314,755. 11 _ I_________ 1 972,823.74 1 ___________ 1,727,917.52 _ _ _ ____________ 1,431,390.22 1,009,089.00 l I 1,241,816.80 256,569.29 2,437,881.94 2,167,930.27 ____________ ~~548,425.77 _ _ _ . ___________ 1,005,480.76 = 1,623,288.02 _____ _ 282,543.18 15,806.40 499,391.48 231,252.41 28,500.33 215,630.54 197,629.27 433,204.20 46,465.08 38,550.67 100,768.84 568,159.64 49,810.45 _______ ___ ___ _______61,994.15 41,565.98 50,800.03 36,802,182.80 l __________ _________ _ 1 112,437,360.93 page 12 of 12 Cost estimate of compenstion for temporary land borrowing shared by other municipal for Datansha project (pipe network) attached table 18.3.2.7.2. 1BD Grade I Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Subtotal Area of land borrowed 29,669.76 61,238.73 92,285.93 203,518.83 386,713.25 Area of cultivated land 2,966.98 - 6,123.87 9,228.59 20,351.88 38,671.32 Unit price for cultivated land 6.50 6.00 5.50 5.00 4.50 4.00 31.50 borrowed Average time of borrowing 6.00 6.00 6.00 6.00 6.00 6.00 36.00 Cost of borrowing 115,712.07 - 202,087.80 276,857.80 - 488,445.18 1,083,102.85 Cost of rehabilitation 17,801.86 36,743.24 55,371.56 122,111.30 232,027.95 Compensation of standing crop 14,834.88 . 30,619.36 46,142.97 101,759.41 193,356.62 Area of land for construction 26,702.79 - 55,114.85 83,057.34 - 183,166.94 348,041.92 Unit price for construction land 8.50 8.00 7.50 7.00 6.50 6.00 43.50 Average time of borrowing 6.00 6.00 6.00 6.00 6.00 6.00 36.00 Cost of construction land 1,361,842.11 - 2,480,168.44 3,488,408.28 - 6,594,009.93 13,924,428.76 borrowing page I of I