(P170874)
DRAFT May 16, 2019




    Indonesia Disaster Resilience Initiatives Project
                      (P170874)

                     ENVIRONMENTAL AND SOCIAL
                      COMMITMENT PLAN (ESCP)

                                        May 16, 2019

                                           Prepared By:

   National Disaster Management Authority
(BNPB) and Indonesian Agency for Meteorology,
     Climatology and Geophysics (BMKG)

  Note: This ESCP is in a draft form and yet to be agreed by all parties involved in the implementation of the
 outlined measures to address the applicable ESSs under the project. Once consensus has been secured from
  these parties, the final agreed ESCP will be disclosed by the Government of Indonesia by their respective
                                             implementing agencies.




                                                                                                    1|Page
(P170874)
DRAFT May 16, 2019




   Republic of Indonesia / National Disaster Management Authority and Indonesia Agency for Meteorology,
                                          Climatology and Geophysics

                           Indonesia Disaster Resilience Initiatives Project (P170874)

                             ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN

    1. The Republic of Indonesia is planning to implement the Indonesia Disaster Resilience Initiatives Project
       (the Project), with the involvement of the following Ministries/agencies/units: 1) National Disaster
       Management Authority (BNPB) and 2) Indonesia Agency for Meteorology, Climatology and Geophysics
       (BMKG). The International Bank for Reconstruction and Development (hereinafter the Bank) has agreed
       to provide financing for the Project.

    2. Subject to further confirmation of the loan request, Republic of Indonesia, through BNPB and BMKG will
       implement material measures and actions so that the Project is implemented in accordance with the
       World Bank’s Environmental and Social Standards (ESSs). This Environmental and Social Commitment Plan
       (ESCP) sets out a summary of the material measures and actions.

    3. Where the ESCP refers to specific plans or other documents, whether they have already been prepared
       or are to be developed, the ESCP requires compliance with all provisions of such plans or other documents.
       In particular, the ESCP requires compliance with the provisions set out in the environmental impact
       assessment (AMDAL or UKL-UPL), Stakeholder Engagement Plan (SEP), Labor Management Procedures,
       Resettlement Action Plan, any other documents that will be identified and developed for the Project.

    4. The table below summarizes the material measures and actions that are required, as well as the timing of
       the material measures and actions. The Republic of Indonesia is responsible for compliance with all
       requirements of the ESCP even when implementation of specific measures and actions is conducted by
       the project implementation units under BNPB and BMKG.

    5. Implementation of the material measures and actions set out in this ESCP will be monitored and reported
       to the Bank by Republic of Indonesia as required by the ESCP and the conditions of the legal agreement,
       and the Bank will monitor and assess progress and completion of the material measures and actions
       throughout implementation of the Project.

    6. As agreed by the Bank and the Republic of Indonesia, this ESCP may be revised from time to time during
       Project implementation, to reflect adaptive management of Project changes and unforeseen
       circumstances or in response to assessment of Project performance conducted under the ESCP itself. In
       such circumstances, Republic of Indonesia will agree to the changes with the Bank and will update the
       ESCP to reflect such changes. Agreement on changes to the ESCP will be documented through an exchange
       of letters signed by the Bank and the Republic of Indonesia. The Republic of Indonesia will disclose the
       updated ESCP promptly. Depending on the project, the ESCP may also specify the funding necessary for
       completion of a measure or action.

    7. Where Project changes, unforeseen circumstances, or Project performance result in changes to the risks
       and impacts during Project implementation, the Republic of Indonesia shall provide additional funds, if
       needed, to implement actions and measures to address such risks and impacts.



                                                                                                     2|Page
ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN (ESCP): MAY 2019


 Indonesia Disaster Resilience Initiatives Project [P170874]
 ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN
 DATE [Draft April 12, 2019]
 Summary of the Material Measures and Actions to Mitigate the                  Timeframe            Responsibility / Authority and      Date of Completion
 Project’s Potential Environmental and Social Risks and Impacts                                     Resources/Funding Committed
 ESCP Monitoring and Reporting
          REGULAR REPORTING: Prepare and submit regular monitoring             Six-monthly          Project Implementation Units/PIUs   To be confirmed.
          reports on the implementation of the ESCP.                           throughout Project   (BNPB and BMKG)                     It is proposed for
                                                                               implementation.                                          recurring reporting
                                                                                                    Source: loan proceeds under         (six-monthly
                                                                                                    Project Implementation Support      throughout Project
                                                                                                    (Component 2 – BMKG;                implementation.
                                                                                                    Component 3 – BNPB).
          INCIDENTS AND ACCIDENTS NOTIFICATION: Prepare and                    Prior to loan        BNPB and BMKG                       To be confirmed (i.e.
          implement an incident reporting procedure as part of the             effectiveness.                                           expected date for the
          project-level Environmental and Social Management Framework          Maintain             Source: loan proceeds under         loan effectiveness).
          (ESMF), indicating details of the incident, institutional            throughout Project   Project Implementation Support
          responsibilities, immediate measures to address the reported         implementation.      (Component 2 – BMKG;
          incident and information requirements to be provided by the                               Component 3 – BNPB).
          contractor or supervision engineer as appropriate.
 SUMMARY ASSESSMENT
 ESS 1: ASSESSMENT AND MANAGEMENT OF ENVIRONMENTAL AND SOCIAL RISKS AND IMPACTS
  1.1     ORGANIZATIONAL STRUCTURE: The PMU to hire at least two               Prior to loan        BNPB and BMKG                       Prior to loan
          personnel as qualified environmental and social specialist with at   effectiveness.                                           effectiveness.
          least 5 years of experience embedded in the Project                  Maintain as          Source: loan proceeds under         E&S staff to be
          Management Unit (PMU) to assist the PIUs.                            necessary            Project Implementation Support      retained until the
                                                                               throughout Project   (Component 2 – BMKG;                project’s completion.
                                                                               implementation.      Component 3 – BNPB).
  1.2     ENVIRONMENTAL AND SOCIAL ASSESSMENT: Prepare a project-              Prior to loan        BNPB and BMKG                       Prior to loan
          level ESMF which establish requirements for screening and/or         effectiveness.       Source: loan proceeds Project       effectiveness.
          guide sub-project activities which may require specific              Maintained           Implementation Support
          environmental and social assessment or management plans. The         throughout Project   (Component 2 – BMKG;                ESMF to be prepared
                                                                               implementation.      Component 3 – BNPB).                by BMKG and BNPB
                                                                                                                                                   3|Page
ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN (ESCP): MAY 2019


 Indonesia Disaster Resilience Initiatives Project [P170874]
 ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN
 DATE [Draft April 12, 2019]
 Summary of the Material Measures and Actions to Mitigate the                   Timeframe           Responsibility / Authority and   Date of Completion
 Project’s Potential Environmental and Social Risks and Impacts                                     Resources/Funding Committed
          project-level ESMF will have specific requirements on the need for                                                         that is acceptable to
          management plans at project and sub-project levels.                                                                        the Bank before the
                                                                                                                                     loan effectiveness.
  1.3     PERMIT, CONSENTS AND AUTHORIZATIONS:                                  Prior to            BNPB and BMKG                    Prior to procurement
              a. For sub-components 1.3 and 1.4, obtain relevant                procurement of                                       of construction works.
                 environmental permits through AMDAL or UKL/UPL                 construction        Source: loan proceeds under
                 processes applicable to the project activities from relevant   works.              Project Implementation Support
                 government authorities. During project implementation.                             (Component 2 – BMKG;
                 These permits will be subject to the Bank’s due diligence                          Component 3 – BNPB).
                 on the basis of which, remedial measures may be
                 proposed.
              b. Under other sub-components, the need and types of
                 environmental permits for each individual activity will be
                 further assessed during project implementation.
  1.4     THIRD PARTY MONITORING:                                               Prior to loan       BNPB and BMKG                    Prior to loan
          Prepare a Terms of Reference (TOR) under the project’s ESMF for       effectiveness                                        effectiveness.
          independent E&S audits indicating the scope, timing, reporting                            Source: loan proceeds under
          processes and feedback loops.                                                             Project Implementation Support
                                                                                                    (Component 2 – BMKG;
                                                                                                    Component 3 – BNPB).
 ESS 2: LABOR AND WORKING CONDITIONS
  2.1     LABOR MANAGEMENT PROCEDURES:                                          Prior to loan       BNPB and BMKG                    Prior to loan
          As part of the ESMF specified in 1.2, develop Labor Management        effectiveness and                                    effectiveness.
          Procedure (LMP) in accordance with the GOI’s legal framework          updated during      Source: loan proceeds under
          and the ESS2. This LMP is applicable to direct workers, contracted    implementation.     Project Implementation Support
          workers and community workers.                                                            (Component 2 – BMKG;
                                                                                                    Component 3 – BNPB).


                                                                                                                                                 4|Page
ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN (ESCP): MAY 2019


 Indonesia Disaster Resilience Initiatives Project [P170874]
 ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN
 DATE [Draft April 12, 2019]
 Summary of the Material Measures and Actions to Mitigate the                    Timeframe           Responsibility / Authority and    Date of Completion
 Project’s Potential Environmental and Social Risks and Impacts                                      Resources/Funding Committed
  2.2     GRIEVANCE REDRESS MECHANISM (GRM) FOR PROJECT                          GRM procedure for BNPB and BMKG                       To be confirmed (i.e.
          WORKERS:                                                               project workers is   Appointed Contractors            expected date for the
          Develop and maintain a grievance mechanism as part of the labor        established prior to                                  loan effectiveness)
          management procedures for project workers.                             loan effectiveness. Source:
                                                                                 GRM to be            a. Loan proceeds under Project
                                                                                 disseminated to          Implementation Support
                                                                                 project workers          (Component 2 – BMKG;
                                                                                 prior to                 Component 3 – BNPB).
                                                                                 commencing any       b. Contractors’ E&S budget
                                                                                 works and
                                                                                 maintained
                                                                                 throughout the
                                                                                 project
                                                                                 implementation.
  2.3     OHS MEASURES: As part of the ESMF specified in 1.2, develop and        Prior to loan        BNPB and BKMG                    Prior to loan
          implement occupational, health and safety (OHS) measures for           effectiveness and                                     effectiveness.
          project workers in accordance to the ESS5.                             maintained           Source: loan proceeds under
                                                                                 throughout the       Project Implementation Support
                                                                                 project              (Component 2 – BMKG;
                                                                                 implementation.      Component 3 – BNPB).
  2.4     EMERGENCY PREPAREDNESS AND RESPONSE: Prepare                           Plan in place: prior Contractor                       To be confirmed
          Emergency Preparedness and Response Plan under Sub-                    to construction,
          components 1.3, 1.4 and 2.3 for (i) construction period and (ii) for   prior to operation   Source: loan proceeds under
          operation stage. Ensure workers and contractors are trained.                                Project Implementation Support
          Implement the plan as needed.                                          Workers trained:     (Component 2 – BMKG;
                                                                                 prior to             Component 3 – BNPB).
                                                                                 commencing
                                                                                 project work

                                                                                                                                                   5|Page
ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN (ESCP): MAY 2019


 Indonesia Disaster Resilience Initiatives Project [P170874]
 ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN
 DATE [Draft April 12, 2019]
 Summary of the Material Measures and Actions to Mitigate the                Timeframe             Responsibility / Authority and    Date of Completion
 Project’s Potential Environmental and Social Risks and Impacts                                    Resources/Funding Committed
                                                                             Plan implemented:
                                                                             as required during
                                                                             construction and
                                                                             operation
  2.5     PROJECT WORKERS TRAINING: Implement training of Project            Prior to and during   BNPB                              To be confirmed
          Workers designed to heighten awareness of OHS risks.               construction          Source: loan proceeds under
                                                                                                   Project Implementation Support
                                                                                                   (Component 2 – BMKG;
                                                                                                   Component 3 – BNPB).
 ESS 3: RESOURCE EFFICIENCY AND POLLUTION PREVENTION AND MANAGEMENT
  3.1     MANAGEMENT OF WASTE AND HAZARDOUS MATERIALS: As                    Prior to loan         BNPB and BMKG                     Prior to loan
          part of the ESMF specified in 1.2, develop and implement           effectiveness and                                       effectiveness.
          measures and procedures for management of waste and                maintained            Source: loan proceeds under
          hazardous materials during demolition, dismantling and disposal.   throughout the        Project Implementation Support
          This will include the requirements on the disposal of batteries    project               (Component 2 – BMKG;
          and thermometers from weather stations to proper licensed          implementation.       Component 3 – BNPB).
          hazardous waste management facilities (if any).
 ESS 4: COMMUNITY HEALTH AND SAFETY
  4.1     TRAFFIC AND ROAD SAFETY: As part of the ESMF specified in 1.2,     Prior to loan         Contractors with oversight from   Prior to loan
          develop and implement a road safety management procedure as        effectiveness.        PIUs.                             effectiveness.
          part of the ESMF to address potential hazards for communities      Maintained
          resulting from construction activities and operationalization of   throughout            Source: contractors’ E&S budget
          construction equipment.                                            construction
                                                                             activities




                                                                                                                                                 6|Page
ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN (ESCP): MAY 2019


 Indonesia Disaster Resilience Initiatives Project [P170874]
 ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN
 DATE [Draft April 12, 2019]
 Summary of the Material Measures and Actions to Mitigate the                 Timeframe            Responsibility / Authority and   Date of Completion
 Project’s Potential Environmental and Social Risks and Impacts                                    Resources/Funding Committed
  4.2     COMMUNITY HEALTH AND SAFETY: Prepare hazard risk                    Prior to             BNPB                             Prior to loan
          assessment and contingency plan in coordination with local          construction                                          effectiveness.
          authorities and affected communities to build early warning         works. Maintained
          communication and evacuation plans.                                 throughout
                                                                              construction
                                                                              activities
  4.3     GBV AND SEA RISKS: As part of the project’s ESMF specified in       Prior to loan        BNPB                             Prior to loan
          1.2 and Technical Assistance (TA) support by the project, develop   effectiveness.                                        effectiveness.
          and implement measures and actions as well as capacity building     Maintained           Source: loan proceeds under
          plans to assess and manage the risks of gender-based violence       throughout Project   Project Implementation Support
          (GBV) and sexual exploitation and abuse (SEA) as direct risks of    implementation.
          project implementation and management of future disasters.
  4.4     EMERGENCY RESPONSE MEASURES:                                        Prior to loan        BNPB                             Prior to loan
          As part of the ESMF specified in 1.2, develop and implement         effectiveness.                                        effectiveness.
          measures to address emergency events during the construction        Maintained           Source: loan proceeds under
          and operation phases in coordination with measures under 2.4        throughout Project   Project Implementation Support
          where relevant.                                                     implementation.
 ESS 5: LAND ACQUISITION, RESTRICTIONS ON LAND USE AND INVOLUNTARY RESETTLEMENT
  5.1     RESETTLEMENT POLICY FRAMEWORK (RPF):                                Prior to loan        BNPB                             Prior to loan
          As part of the ESMF specified in 1.2, develop a Resettlement        effectiveness.                                        effectiveness.
          Policy Framework (RPF) describing policies, procedures and          Maintained           Source: loan proceeds under
          processes that will be followed throughout the project in the       throughout Project   Project Implementation Support
          course of mitigation of adverse social impacts due to project-      implementation.
          related land acquisition, restriction on land use and involuntary
          resettlement.
  5.2     RESETTLEMENT PLANS (RP): in the event that involuntary              Prior to land        BNPB                             Prior to land
          resettlement is envisaged for the purpose of land acquisition,      acquisition and                                       acquisition and
          develop and implement Resettlement Plans consistent with the                                                              resettlement (if any).
                                                                                                                                                7|Page
ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN (ESCP): MAY 2019


 Indonesia Disaster Resilience Initiatives Project [P170874]
 ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN
 DATE [Draft April 12, 2019]
 Summary of the Material Measures and Actions to Mitigate the                    Timeframe            Responsibility / Authority and   Date of Completion
 Project’s Potential Environmental and Social Risks and Impacts                                       Resources/Funding Committed
          requirements of Government of Indonesia’s law and regulation as        resettlement (if     Source: loan proceeds under
          well as ESS5. The plan will include details of consultations and       any)                 Project Implementation Support
          engagement with affected people, livelihoods restoration
          measures and available GRM processes to affected land owners.
  5.3     GRIEVANCE MECHANISM: As part of the ESMF specified in 1.2,             Prior to loan        BNPB                             Prior to loan
          prepare a Grievance Redress Mechanism (GRM) framework for              effectiveness.                                        effectiveness.
          potentially affected people as a result of land acquisition (if any)   Maintained           Source: loan proceeds under
                                                                                 throughout Project   Project Implementation Support
                                                                                 implementation.
 ESS 6: BIODIVERSITY CONSERVATION AND SUSTAINABLE MANAGEMENT OF LIVING NATURAL RESOURCES
 6.1      BIODIVERSITY RISKS AND IMPACTS: As part of the ESMF specified     Prior to loan      BNPB                                    Prior to loan
          in 1.2, develop and implement screening procedures to ensure no   effectiveness.                                             effectiveness.
          biodiversity risks and impacts resulting from the proposed        Maintained         Source: loan proceeds under
          infrastructure.                                                   throughout Project Project Implementation Support
                                                                            implementation.
 ESS 7: INDIGENOUS PEOPLES/SUB-SAHARAN AFRICAN HISTORICALLY UNDERSERVED TRADITIONAL LOCAL COMMUNITIES
 7.1     INDIGENOUS PEOPLES PRESENT OR COLLECTIVELY ATTACHED                Following          BNPB and BMKG                           Following
         TO PROJECT AREA:                                                   identification of                                          identification of
         Conduct an assessment in conjunction with action 1.2               project locations  Source: loan proceeds under             project locations.
         (Environmental and Social Assessment) of the ESCP to                                  Project Implementation Support
         understand the nature and degree of the expected direct and                           (Component 2 – BMKG;
         indirect economic, social, cultural and environmental impacts on                      Component 3 – BNPB).
         community groups identified as Indigenous Peoples who are
         present in, or have collective attachment to, the project area and
         other footprints




                                                                                                                                                   8|Page
ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN (ESCP): MAY 2019


 Indonesia Disaster Resilience Initiatives Project [P170874]
 ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN
 DATE [Draft April 12, 2019]
 Summary of the Material Measures and Actions to Mitigate the                    Timeframe             Responsibility / Authority and   Date of Completion
 Project’s Potential Environmental and Social Risks and Impacts                                        Resources/Funding Committed
 7.2      INDIGENOUS PEOPLES PLANNING FRAMEWORK: develop and                     Prior to loan         BNPB and BMKG                    Prior to loan
          implement an Indigenous Peoples Planning Framework (IPPF) as           effectiveness         Source: loan proceeds under      effectiveness.
          part of the project’s ESMF specified in 1.2. The IPPF will provide a                         Project Implementation Support
          guideline for screening, consultations and engagement as well as                             (Component 2 – BMKG;
          GRM for community groups identified as Indigenous Peoples.                                   Component 3 – BNPB).
 7.3      INDIGENOUS PEOPLES PLAN: develop and implement an                      After screening (if   BNPB and BMKG                    After screening (if
          Indigenous Peoples Plan (IPP) in the event that there is presence      there is presence     Source: loan proceeds under      there is presence of
          of Indigenous Peoples in the project target areas as informed by       of Indigenous         Project Implementation Support   Indigenous peoples)
          the screening process specified in 7.1.                                peoples)              (Component 2 – BMKG;
                                                                                                       Component 3 – BNPB).
 ESS 8: CULTURAL HERITAGE
 8.1      CHANCE FINDS: If required, a chance find procedure will be             Prior to loan         BNPB and BMKG                    Prior to loan
          produced as part of the ESMF.                                          effectiveness.        Source: loan proceeds under      effectiveness.
                                                                                 Maintained            Project Implementation Support
                                                                                 throughout Project    (Component 2 – BMKG;
                                                                                 implementation.       Component 3 – BNPB).

 ESS 10: STAKEHOLDER ENGAGEMENT AND INFORMATION DISCLOSURE
 10.1     SEP PREPARATION: Develop a Stakeholder Engagement Plan                 A framework-level     BNPB and BMKG                    Prior to loan
          (SEP) that describes how information will be provided to, and          SEP will be           Source: loan proceeds under      effectiveness.
          received from, stakeholders. The SEP will include and describe a       developed and         Project Implementation Support
          grievance mechanism.                                                   disclosed prior to    (Component 2 – BMKG;
                                                                                 Board’s approval.     Component 3 – BNPB).




                                                                                                                                                    9|Page
ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN (ESCP): MAY 2019


 Indonesia Disaster Resilience Initiatives Project [P170874]
 ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN
 DATE [Draft April 12, 2019]
 Summary of the Material Measures and Actions to Mitigate the              Timeframe              Responsibility / Authority and       Date of Completion
 Project’s Potential Environmental and Social Risks and Impacts                                   Resources/Funding Committed
 10.2   SEP IMPLEMENTATION: Implement the Stakeholder Engagement Throughout Project               BNPB and BMKG                        After loan
        Plan, including grievance mechanism. This is to include           implementation          Source: loan proceeds under          effectiveness and
        information dissemination and consultations regarding                                     Project Implementation Support       maintained
        emergency preparedness and response, and training of local                                (Component 2 – BMKG;                 throughout project
        officials as needed to implement the plan.                                                Component 3 – BNPB).                 implementation.
 Capacity Support
               Specify Training to be provided                  Specify Targeted Groups and                        Specify Training Completed
                                                                   Timeframe for Delivery
       To be identified during project implementation.          To be identified during project           To be identified during project implementation.
                                                                       implementation.




                                                                                                                                                 10 | P a g e