Public Disclosure Copy

          The World Bank                                                                             Implementation Status & Results Report
          Pakistan: Punjab Public Management Reform Program (P132234)


Pakistan: Punjab Public Management Reform Program (P132234)

SOUTH ASIA | Pakistan | Governance Global Practice |
IBRD/IDA | Program-for-Results | FY 2014 | Seq No: 8 | ARCHIVED on 22-Jan-2018 | ISR27712 |


Implementing Agencies: Punjab Resource Management Program, Excise & Taxation Department, Punjab Information Technology Board, Punjab
Public Procurement Regulatory Authority, Planning and Development Department




Program Development Objectives

 Program Development Objective (from Program-for-Results Appraisal Document)
 To improve transparency and resource management of targeted departments of the Province of Punjab.



Overall Ratings
Name                                                                        Previous Rating                          Current Rating

Progress towards achievement of PDO                                          Satisfactory                            Satisfactory
Overall Implementation Progress (IP)                                         Satisfactory                            Satisfactory
Overall Risk Rating                                                          Moderate                                Moderate


Implementation Status and Key Decisions
Program results: The Third Party Validation (TPV) report for the fourth year of the program (FY2016/17) confirmed the achievement of four of the
five the Disbursement Linked Indicator (DLI) targets. According to the TPV report, the target for DLI 2 on access to information through the Citizen
Contact Center (CCC) was achieved by 80%. Data from the Punjab Information Technology Board however indicates that the target has been
exceeded since July 2017 (i.e., during the fifth year of program implementation). The reported increase appears to have been a result of an
intensified awareness campaign as well as reported citizen satisfaction with the handling of complaints through the CCC. Based on this trend, the
final target for the program (750,000 calls and messages) is likely to be achieved.
The digitization of Urban Immovable Property Tax (UIPT) records has been completed in 26 districts and is ongoing in another 8 districts. The
digitization of UIPT records with the addition of previously unregistered properties has contributed to the increase of UIPT receipts by 102 percent
(in nominal terms) since FY2012/13, exceeding the end-of-program target by 33.7%.
By the end of year four (FY2016/17), the delivery of 216 district services was being monitored in real time through 'smart management
tools' (smartphone and tablet apps for data collection in the field, and management dashboards for the aggregation, analysis, and reporting of
performance data). This exceeds the end-of-program target of 180 district services, which points to the usefulness of the smart monitoring
introduced under the program for additional departments. Smart monitoring is currently implemented throughout the province's 36 districts for six
services provided by the departments of School Education, Health, Agriculture, and Livestock.




Data on Financial Performance

Disbursements (by loan)

Project       Loan/Credit/TF      Status      Currency       Original    Revised      Cancelled     Disbursed      Undisbursed                 Disbursed



1/22/2018                                                   Public Disclosure Copy                                                        Page 1 of 9
                                                                         Public Disclosure Copy

                        The World Bank                                                                            Implementation Status & Results Report
                        Pakistan: Punjab Public Management Reform Program (P132234)



      P132234                IDA-53140         Effective   USD              50.00        50.00           0.00         38.35             7.70                        83%


     Key Dates (by loan)
      Project                Loan/Credit/TF    Status      Approval Date        Signing Date     Effectiveness Date    Orig. Closing Date      Rev. Closing Date

      P132234                IDA-53140         Effective   14-Nov-2013          02-Dec-2013      10-Jan-2014           31-Dec-2018             --


              Risks

              Systematic Operations Risk-rating Tool

              Risk Category                                              Rating at Approval               Previous Rating             Current Rating

              Political and Governance                                    --                              Substantial                Substantial
              Macroeconomic                                               --                              Substantial                Substantial
              Sector Strategies and Policies                              --                              Moderate                   Moderate
              Technical Design of Project or Program                      --                              Low                        Low
              Institutional Capacity for Implementation and
              Sustainability
                                                                          --                              Substantial                Moderate
              Fiduciary                                                   --                              Substantial                Substantial
              Environment and Social                                      --                              Low                        Moderate
              Stakeholders                                                --                              Moderate                   Moderate
              Other                                                       --                              Moderate                   Moderate
              Overall                                                     --                              Moderate                   Moderate


Disbursement Linked Indicators (DLI)
PHDLIPDOTBL




              Targeted organizations publishing updated institutional information on their websites for information of the public. (Number)

                                                              Baseline                           Actual (Previous)            Actual (Current)

              Value                                           0.00                               63.00                        81.00

              Date                                            30-Jun-2013                        28-Sep-2015                  30-Jun-2017

              Comments
              The target refers to websites created by government departments as well as internal divisions and subordinated agencies to disclose
              institutional information. Websites of divisions and agencies under the same department are available through the department’s website to
              ensure easy access for users to the services that interest them. In order to meet the requirements under the program, organizations are
              required to publish updated institutional, organizational and budgetary information. The indicator also measures sustaining the maintenance
              and comprehensive disclosure of websites created during the previous year.

              The TPV report for the fourth year (FY2106/17) found that 84 websites were accessible but three of these websites lacked some of the required
              information. Therefore 81 websites were found in compliance with the requirements of the DLI definition against a target of 75.




     1/22/2018                                                           Public Disclosure Copy                                                       Page 2 of 9
                                                                         Public Disclosure Copy

                      The World Bank                                                                               Implementation Status & Results Report
                      Pakistan: Punjab Public Management Reform Program (P132234)

PHDLIPDOTBL




             Number of calls received by the Citizen Contact Centers to seek information about key services. (Number)

                                                              Baseline                           Actual (Previous)              Actual (Current)

              Value                                           50000.00                           157214.00                      321218.00

              Date                                            30-Jun-2013                        28-Sep-2015                    30-Jun-2017

              Comments
              On the request of the Government of Punjab the definition of this indicator was changed from the ‘number of telephone calls received by the
              Citizen Contact Center to seek information about key services’ to the 'number of enquiries/comments received by the Citizen Contact Center to
              seek information about, or to provide feedback on key services' with retroactive effect from July 1, 2016. The adjustment was needed to take
              into account the preference of a large share of the public for obtaining information about public services through SMS and other forms of
              electronic communications as well as the high number of calls and messages from citizens to Citizen Contact Center (CCC) the providing
              feedback on public service delivery.

              The targets for this indicator were met during the first three years of the program. Despite the adjusted definition of the indicator, the TPV report
              indicates that the target for FY2016/17 was not met, but was achieved by 80% (321,218 calls and messages against a target of 400,000).
              Based on administrative data reported by the Punjab Information Technology Board, it appears that the target has since been achieved thanks
              to an increase in citizen-CCC communications since July 2017. The reported increase appears to have been a result of an intensified
              awareness campaign as well as reported citizen satisfaction with the handling of complaints through the CCC. Based on this trend, the final
              target for the program (750,000 calls and messages) is likely to be achieved.



PHDLIPDOTBL




             Services being monitored by smart management tools. (Number)

                                                              Baseline                           Actual (Previous)              Actual (Current)

              Value                                           18.00                              144.00                         216.00

              Date                                            30-Jun-2013                        28-Sep-2015                    30-Jun-2017

              Comments
              The TPV report for FY2016/17 confirmed the achievement of 180 district services being monitored through smart management tools. The
              following five services were being monitored in all 36 districts:

              - Health Watch: regular inspection visits of primary and secondary healthcare facilities (presence of medical and paramedical staff, availability
              of medicines and supplies, condition of facilities)
              - MEA (Monitoring and Evaluation Assistant) Health: regularly monitors a wide range of indicators for 124 district and city headquarter hospitals
              (including occupancy rates, functionality of equipment, availability of medicines and supplies, medical procedures conducted, disposal of
              medical waste, etc.)
              - PMIU (Program Monitoring Implementation Unit) for school education: regularly monitors 52,695 primary and secondary schools, including
              teacher presence, student attendance, and availability of facilities such as electricity, water and sanitation
              - E-vaccs: monitors daily field activities of vaccinators to ensure comprehensive coverage of infant immunization program
              - Agri-smart: monitors daily field activities of agricultural extension staff

              In addition, the Vet Inspect system has also been implemented in all 36 districts (monitoring of services delivered by veterinary staff to livestock
              farmers), bringing the total number of district services to 216.


PHDLIPDOTBL




             Properties added to the urban property registry (Number)

                                                              Baseline                           Actual (Previous)              Actual (Current)



     1/22/2018                                                            Public Disclosure Copy                                                         Page 3 of 9
                                                                        Public Disclosure Copy

                      The World Bank                                                                              Implementation Status & Results Report
                      Pakistan: Punjab Public Management Reform Program (P132234)



              Value                                          3227899.00                        300000.00                    152556.00

              Date                                           30-Jun-2013                       28-Sep-2015                  30-Jun-2017

              Comments
              The digitization of Urban Immovable Property Tax (UIPT) records have been digitized and updated in 26 districts. Work is ongoing in the
              remaining eight districts and is expected to be completed by the end of FY2017/18 (June 30, 2018).

              As confirmed by the TPV reports, the DLI targets for the first three years have been achieved.

              Year 1: 108,667 properties added (target: 97,000)
              Year 2: 151,511 properties added (target: 133,000)
              Year 3: 138, 714 properties added (target: 138,000)
              Year 4: 152,556 (target: 150,000)

              Total properties added to date: 551,448

              N.B. The targets for this DLI are annual. The end target of 150,000 properties applies to year 5.



PHDLIPDOTBL




              Targeted organizations using PPRA MIS for targeted contracts. (Number)

                                                             Baseline                          Actual (Previous)            Actual (Current)

              Value                                          0.00                              35.00                        75.00

              Date                                           30-Jun-2013                       28-Sep-2015                  30-Jun-2017

              Comments
              The DLI targets for the first four years have been met. The TPV report for the fourth year audited procurements entered in the MIS by 75
              contracting authorities and confirmed that the target of 75 targeted organizations entering contracts in the MIS had been met. The report
              however noted several shortcomings in the entered data and provided recommendations for improving the consistent and correct utilization of
              the system.




              Results

              Results Area

              Intermediate Results Area

              Transparency and Access to Services
              Performane Monitoring
              Resource Management


              Project Development Objective Indicators




     1/22/2018                                                           Public Disclosure Copy                                                    Page 4 of 9
                                                                 Public Disclosure Copy

               The World Bank                                                                             Implementation Status & Results Report
               Pakistan: Punjab Public Management Reform Program (P132234)

 PHINDPDOTBL




          Number of telephone calls received by the Citizen Contact Centers to seek information about key services. (Number, Custom)


                                                Baseline                       Actual (Previous)          Actual (Current)             End Target

         Value                                  50,000.00                      98,000.00                  321,000.00                   750,000.00

         Date                                   15-Nov-2013                    28-Feb-2017                30-Jun-2017                  10-Jan-2019


         Comments
         On the request of the Government of Punjab the definition of this indicator was changed from the ‘number of telephone calls received by the
         Citizen Contact Center to seek information about key services’ to the 'number of enquiries/comments received by the Citizen Contact
         Center to seek information about, or to provide feedback on key services' with retroactive effect from July 1, 2016. The adjustment was
         needed to take into account the preference of a large share of the public for obtaining information about public services through SMS and
         other forms of electronic communications as well as the high number of calls and messages from citizens to Citizen Contact Center (CCC)
         the providing feedback on public service delivery.
         The targets for this indicator were met during the first three years of the program. Despite the adjusted definition of the indicator, the TPV
         report indicates that the target for FY2016/17 was not met, but was achieved by 80% (321,218 calls and messages against a target of
         400,000). Based on administrative data reported by the Punjab Information Technology Board, it appears that the target has since been
         achieved thanks to an increase in citizen-CCC communications since July 2017. The reported increase appears to have been a result of an
         intensified awareness campaign as well as reported citizen satisfaction with the handling of complaints through the CCC. Based on this
         trend, the final target for the program (750,000 calls and messages) is likely to be achieved.




 PHINDPDOTBL




      Decision-makers using reliable service delivery information measured as the percentage of reports that trigger managerial
     action (Percentage, Custom)

                                                Baseline                       Actual (Previous)          Actual (Current)             End Target

         Value                                  0.00                           100.00                     100.00                       65.00

         Date                                   30-Jun-2013                    15-Mar-2017                30-Jun-2017                  10-Jan-2019


 PHINDPDOTBL




          Urban immovable property tax (UIPT) collection - in PKR million (Amount(USD), Custom)


                                                Baseline                       Actual (Previous)          Actual (Current)             End Target

         Value                                  4,657.00                       7,311.00                   9,325.00                     6,977.00

         Date                                   30-Jun-2013                    28-Feb-2017                30-Jun-2017                  01-Oct-2019




1/22/2018                                                        Public Disclosure Copy                                                        Page 5 of 9
                                                                   Public Disclosure Copy

                   The World Bank                                                                         Implementation Status & Results Report
                   Pakistan: Punjab Public Management Reform Program (P132234)




               Comments
               UIPT receipts in FY2016/17 reached PKR 9.33 billion, exceeding the end-of-program target by 33.65%.




 Overall Comments




 Intermediate Results Indicators
 PHINDIRITBL




            Targeted organizations publishing updated institutional information on their websites for information of the public. (Number,
           Custom)

                                                    Baseline                     Actual (Previous)         Actual (Current)      End Target

               Value                                0.00                         81.00                     81.00                 75.00

               Date                                 30-Jun-2013                  15-Mar-2017               30-Jun-2017           10-Jan-2019

 PHINDIRITBL




              Public investment projects of targeted departments geo-mapped and published online. (Percentage, Custom)

                                                    Baseline                     Actual (Previous)         Actual (Current)      End Target

               Value                                0.00                         70.00                     65.00                 75.00

               Date                                 30-Jun-2013                  15-Mar-2017               30-Jun-2017           10-Jan-2019

 PHINDIRITBL




              Targeted departments with automated records system for defined disclosable information. (Number, Custom)

                                                    Baseline                     Actual (Previous)         Actual (Current)      End Target

               Value                                0.00                         5.00                      5.00                  7.00

               Date                                 30-Jun-2013                  15-Mar-2017               15-Mar-2017           10-Jan-2019

 PHINDIRITBL




              Information about key services available to the public through the Contact Center. (Number, Custom)

                                                    Baseline                     Actual (Previous)         Actual (Current)      End Target

               Value                                2.00                         53.00                     45.00                 30.00



1/22/2018                                                           Public Disclosure Copy                                               Page 6 of 9
                                                                      Public Disclosure Copy

                   The World Bank                                                                              Implementation Status & Results Report
                   Pakistan: Punjab Public Management Reform Program (P132234)



               Date                                   30-Jun-2013                    15-Mar-2017                30-Jun-2017                 10-Jan-2019


 PHINDIRITBL




              Services accepting online applications (Number, Custom)

                                                      Baseline                       Actual (Previous)          Actual (Current)            End Target

               Value                                  1.00                           10.00                      11.00                       13.00

               Date                                   30-Jun-2013                    15-Mar-2017                30-Jun-2017                 10-Jan-2019

 PHINDIRITBL




              Services using online processing. (Number, Custom Supplement)

                                                      Baseline                       Actual (Previous)          Actual (Current)            End Target

               Value                                  3.00                           11.00                      12.00                       7.00

 PHINDIRITBL




              Services accepting mobile applications and/or payments (Number, Custom Supplement)

                                                      Baseline                       Actual (Previous)          Actual (Current)            End Target

               Value                                  0.00                           5.00                       5.00                        10.00

 PHINDIRITBL




              Functional facilitation centers (Number, Custom)

                                                      Baseline                       Actual (Previous)          Actual (Current)            End Target

               Value                                  0.00                           149.00                     149.00                      36.00

               Date                                   30-Jun-2013                    15-Mar-2017                30-Jun-2017                 10-Jan-2019


               Comments
               There are six dedicated Citizen Facilitation Services, which provide some 30 administrative services, as well as 142 Land Registration
               Management Information System (LRMIS) offices that provide services related to rural land registration, transfers, and agricultural services.




 PHINDIRITBL




              Functional facilitation centers - using PPP model (Number, Custom Supplement)

                                                      Baseline                       Actual (Previous)          Actual (Current)            End Target

               Value                                  0.00                           6.00                       6.00                        300.00



1/22/2018                                                              Public Disclosure Copy                                                        Page 7 of 9
                                                                 Public Disclosure Copy

                  The World Bank                                                                      Implementation Status & Results Report
                  Pakistan: Punjab Public Management Reform Program (P132234)




 PHINDIRITBL




              District services being monitored by smart management tools (Number, Custom)

                                                  Baseline                    Actual (Previous)       Actual (Current)         End Target

               Value                              18.00                       216.00                  216.00                   180.00

               Date                               30-Jun-2013                 15-Mar-2017             30-Jun-2017              10-Jan-2019

 PHINDIRITBL




              District services for which proactive citizen feedback is collected (Number, Custom)

                                                  Baseline                    Actual (Previous)       Actual (Current)         End Target

               Value                              0.00                        146.00                  144.00                   100.00

               Date                               30-Jun-2013                 15-Mar-2017             30-Jun-2017              10-Jan-2019

 PHINDIRITBL




              District services for which performance information and citizen feedback is published online (Number, Custom)

                                                  Baseline                    Actual (Previous)       Actual (Current)         End Target

               Value                              0.00                        182.00                  180.00                   180.00

               Date                               30-Jun-2013                 15-Mar-2017             30-Jun-2017              10-Jan-2019

 PHINDIRITBL




              Districts with functional digital property registry (Number, Custom)

                                                  Baseline                    Actual (Previous)       Actual (Current)         End Target

               Value                              0.00                        18.00                   26.00                    34.00

               Date                               30-Jun-2013                 15-Mar-2017             30-Jun-2017              10-Jan-2019

 PHINDIRITBL




              Properties added to the property registry (Number, Custom)

                                                  Baseline                    Actual (Previous)       Actual (Current)         End Target

               Value                              3,227,899.00                80,241.00               152,556.00               150,000.00

               Date                               30-Jun-2013                 28-Feb-2017             30-Jun-2017              10-Jan-2019




1/22/2018                                                         Public Disclosure Copy                                                Page 8 of 9
                                                                    Public Disclosure Copy

                   The World Bank                                                                          Implementation Status & Results Report
                   Pakistan: Punjab Public Management Reform Program (P132234)

 PHINDIRITBL




              Targeted contracts processed through basic e-procurement modules in targeted organizations. (Percentage, Custom)

                                                    Baseline                      Actual (Previous)         Actual (Current)           End Target

               Value                                0.00                          100.00                    100.00                     75.00

               Date                                 30-Jun-2013                   28-Feb-2017               28-Feb-2017                10-Jan-2019

 PHINDIRITBL




              Targeted organizations using PPRA MIS for targeted contracts (Number, Custom)

                                                    Baseline                      Actual (Previous)         Actual (Current)           End Target

               Value                                0.00                          93.00                     75.00                      100.00

               Date                                 30-Jun-2013                   28-Feb-2017               30-Jun-2017                10-Jan-2019


               Comments
               The actual has been updated based on the findings of the TPV report for the fourth year (FY2016/17), which confirmed compliance by 75
               contracting authorities.




 Overall Comments




1/22/2018                                                            Public Disclosure Copy                                                     Page 9 of 9