PROCUREMENT PLAN (Textual Part)
Project information: Sudan- Reducing Emissions from Deforestation and forest
Degradation Programme (REDD+ Sudan – P152322.
Project Implementation agency: National Forest Cooperation – Sudan. (FNC)
Date of the Procurement Plan: 25/01/2018
Period covered by this Procurement Plan: 30/06/2019


Preamble

In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers”
(July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in
Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and
conduct all procurement transactions for the Project.

This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan
for the Project. The following conditions apply to all procurement activities in the Procurement
Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the
Procurement Regulations are set forth in STEP.

The Bank’s Standard Procurement Documents: shall be used for all contracts subject to
international competitive procurement and those contracts as specified in the Procurement Plan
tables in STEP.

National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement
Regulations, when approaching the national market (as specified in the Procurement Plan tables
in STEP), the country’s own procurement procedures may be used.
     When the Borrower uses its own national open competitive procurement arrangements as set
     forth in [N/A], such arrangements shall be subject to paragraph 5.4 of the Procurement
     Regulations and the following conditions.

     When other national procurement arrangements other than national open competitive
     procurement arrangements are applied by the Borrower, such arrangements shall be subject
     to paragraph 5.5 of the Procurement Regulations.



Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may
be used for those contracts identified in the Procurement Plan tables. “Not Applicable”
Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement
Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not
Applicable”
Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods
and Works). N/A
      Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan
      tables];
      Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan
      tables]
Hands-on Expanded Implementation Support (HEIS) N/A
Other Relevant Procurement Information.
N/A
PROCUREMENT
                                Sudan : Sudan - FCPF REDD Readiness
PLAN
General Information
Country:                        Sudan                         Bank’s Approval Date of the Original Procurement Plan:                 2018-02-13
                                                                                                                         2019-02-22
                                                              Revised Plan Date(s): (comma delineated, leave blank if none)
Project ID:                     P152322                       GPN Date:
Project Name:                   Sudan - FCPF REDD Readiness
Loan / Credit No:               TF / 19148, TF / A6424
Executing Agency(ies): Sudan - FCPF REDD READINESS



WORKS
                                                                                                                                                                                                                                                                                                                                                 Bid Evaluation
Activity Reference No. /                                                                                                                                                                                                                           Draft Bidding
                                Loan / Credit                                                      Market         Procurement        Prequalification Actual Amount               Process   Draft Pre-qualification       Prequalification                              Specific Procurement    Bidding Documents      Proposal Submission /       Report and
        Description                              Component      Review Type        Method                                                                                                                                                          Document /                                                                                                           Signed Contract         Contract Completion
                                      No.                                                         Approach           Process             (Y/N)                (US$)               Status         Documents              Evaluation Report                                Notice / Invitation         as Issued           Opening / Minutes     Recommendation for
                                                                                                                                                                                                                                                   Justification
                                                                                                                                                                                                                                                                                                                                                     Award
                                                                                                                                                                                             Planned      Actual        Planned     Actual      Planned     Actual       Planned     Actual     Planned     Actual      Planned     Actual     Planned    Actual      Planned       Actual      Planned      Actual


 SD-REDD-52225-CW-RFQ /                                                                                                                                                      Pending
                                                                              Request for                       Single Stage - One
Remodeling the Project          TF / 19148                    Post                            Open - National                                                         0.00   Implementati                                                                               2018-06-22                                                                                    2018-08-17                2019-02-13
                                                                              Quotations                        Envelope
Offices in FNC                                                                                                                                                               on




GOODS
                                                                                                                                                                                                                                                                                                                                                 Bid Evaluation
Activity Reference No. /                                                                                                                                                                                                                           Draft Bidding
                                Loan / Credit                                                      Market         Procurement        Prequalification Actual Amount               Process   Draft Pre-qualification       Prequalification                              Specific Procurement    Bidding Documents      Proposal Submission /       Report and
        Description                              Component      Review Type        Method                                                                                                                                                          Document /                                                                                                           Signed Contract         Contract Completion
                                      No.                                                         Approach           Process             (Y/N)                (US$)               Status         Documents              Evaluation Report                                Notice / Invitation         as Issued           Opening / Minutes     Recommendation for
                                                                                                                                                                                                                                                   Justification
                                                                                                                                                                                                                                                                                                                                                     Award
                                                                                                                                                                                             Planned      Actual        Planned     Actual      Planned     Actual       Planned     Actual     Planned     Actual      Planned     Actual     Planned    Actual      Planned       Actual      Planned      Actual


                                                                                                                                                                             Under
 SD-REDD-52229-GO-RFQ /                                                       Request for                       Single Stage - One
                                TF / 19148                    Post                            Open - National                                                         0.00   Implementati                                                                               2018-09-07                                                                                    2018-11-02                2019-05-01
IT Equipment's and Software                                                   Quotations                        Envelope
                                                                                                                                                                             on




                                                                                                                                                                             Pending
 SD-REDD-53513-GO-RFQ /                                                       Request for                       Single Stage - One
                                TF / 19148                    Post                            Open - National                                                         0.00   Implementati                                                                               2018-06-06                                                                                    2018-08-01                2019-01-28
Furniture for the new offices                                                 Quotations                        Envelope
                                                                                                                                                                             on




NON CONSULTING SERVICES
                                                                                                                                                                                                                                                                                                                                                 Bid Evaluation
Activity Reference No. /                                                                                                                                                                                                                           Draft Bidding
                                Loan / Credit                                                      Market         Procurement        Prequalification Actual Amount               Process   Draft Pre-qualification       Prequalification                              Specific Procurement    Bidding Documents      Proposal Submission /       Report and
        Description                              Component      Review Type        Method                                                                                                                                                          Document /                                                                                                           Signed Contract         Contract Completion
                                      No.                                                         Approach           Process             (Y/N)                (US$)               Status         Documents              Evaluation Report                                Notice / Invitation         as Issued           Opening / Minutes     Recommendation for
                                                                                                                                                                                                                                                   Justification
                                                                                                                                                                                                                                                                                                                                                     Award
                                                                                                                                                                                             Planned      Actual        Planned     Actual      Planned     Actual       Planned     Actual     Planned     Actual      Planned     Actual     Planned    Actual      Planned       Actual      Planned      Actual




CONSULTING FIRMS
Activity Reference No. /                                                                                                                                                                                                                                                                                                          Combined Evaluation
                                Loan / Credit                                                      Market        Contract Type       Actual Amount                                                      Expression of Interest Short List and Draft Request for Proposals Opening of Technical                   Evaluation of
        Description                              Component      Review Type        Method                                                                Process Status       Terms of Reference                                                                                                                                    Report and Draft         Signed Contract       Contract Completion
                                      No.                                                         Approach                               (US$)                                                                   Notice           Request for Proposals            as Issued         Proposals / Minutes   Technical Proposal
                                                                                                                                                                                                                                                                                                                                   Negotiated Contract
                                                                                                                                                                              Planned         Actual     Planned        Actual      Planned     Actual     Planned        Actual     Planned     Actual    Planned       Actual    Planned     Actual    Planned       Actual      Planned       Actual


 SD-REDD-46404-CS-CQS /
DEVELOPING TERMS FOR
STRATEGIC                                                                     Consultant
                                                                                              Open -
ENVIRONMENTAL AND               TF / 19148                    Post            Qualification                                                299,929.00    Signed               2018-01-28                 2018-02-18                2018-04-03                                                                                     2018-05-03             2018-06-07                2018-12-04
                                                                                              International
SOCIAL ASSESSMENT                                                             Selection
(SESA)FOR SUDAN`S
REDD+ PROGRAMME




 SD-REDD-53585-CS-NPO /
Forest Landscapes
                                                                              Non-Profit                                                                 Under
Restoration Assessment and      TF / 19148                    Prior                           Direct                                              0.00                        2018-09-10                                                                                                                                          2018-10-20             2018-11-24                2019-05-23
                                                                              Organizations                                                              Implementation
National Strategy Report
(WRI)




                                                                                                                                                                                                               Page 1
 SD-REDD-53804-CS-UN /
Gender Mainstreaming
                                                    Non-Profit
Strategy & Comprehensive       TF / 19148   Prior                   Direct            320,000.00   Signed           2018-07-20                               2018-08-29   2018-10-03   2019-04-01
                                                    Organizations
Workshop Series, R-Package
Consultations &Report




                                                    Consultant
 SD-REDD-54317-CS-CQS /                                             Open -
                               TF / 19148   Prior   Qualification                           0.00   Canceled         2018-10-01   2018-10-22     2018-12-05   2019-01-04   2019-02-08   2019-08-07
SESA/ESMF                                                           International
                                                    Selection




 SD-REDD-61556-CS-CQS /
4.    REDD+ Information                             Consultant
                                                                                                   Pending
tracking system - safeguards, TF / 19148    Post    Qualification   Open - National         0.00                    2018-09-10   2018-11-08     2018-12-22   2019-01-21   2019-02-25   2019-08-24
                                                                                                   Implementation
REDD+ benefits, impacts,                            Selection
governance, research ....etc




INDIVIDUAL CONSULTANTS




                                                                                                                                       Page 2