Department of Water Supply & Sanitation, Punjab Website: www.pbdwss.gov.in 75470 v5 Procurement Report 2 Procurement Plan For Services Other than Consultancy Contract Status: All As on : 16-Nov-2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Zone: Central Zone, Circle: Bathinda Circle, District: Bathinda PRWSS/ Digital Survey of 25-Aug- 06-Oct- 12-Oct- 26-10- 19-Nov- 1 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Ghanda Bana 2008 2008 2008 2008 2008 Bth/10 Kulwinder PRWSS/ 26-OCT- Contracto Digital Survey of 06-Oct- 12-Oct- 19-Nov- 2 Services/ A 0.50 NS N/A 26-OCT-2008 N/A 2008/0.50/ 26 r Ambala 0.42 Village Ghanda Bana 2008 2008 2008 Bth/10 INR Cantt. / 0 / Indian PRWSS/ Digital Survey of 01-Feb- 03-Mar- 18-Mar- 20-03- 31-May- 3 Services/ P Village Behman 0.50 NCB N/A N/A N/A N/A N/A N/A 2008 2008 2008 2008 2008 Bth/11 Jassa Singh Girish Kumar PRWSS/ Digital Survey of 20-MAR- 03-Mar- 18-Mar- Contracto 31-May- 4 Services/ A Village Behman 0.50 NS N/A 20-MAR-2008 N/A 2008/0.50/ 13 0.48 2008 2008 r Ambala. 2008 Bth/11 Jassa Singh INR /0/ Indian PRWSS/ Digital Survey of 10-Feb- 13-Mar- 28-Mar- 18-06- 05-Jul- 5 Services/ P 0.70 NCB N/A N/A N/A N/A N/A N/A Village Jeond 2008 2008 2008 2008 2008 Bth/12 Kulwinder PRWSS/ 18-JUN- Contracto Digital Survey of 13-Mar- 28-Mar- 05-Jul- 6 Services/ A 0.70 NS N/A 18-JUN-2008 N/A 2008/0.70/ 31 r Ambala 0.48 Village Jeond 2008 2008 2008 Bth/12 INR Cantt. / 0 / Indian PRWSS/ Digital Survey of 31-Aug- 01-Oct- 08-Oct- 17-11- 02-Feb- 7 Services/ P Village Nandgarh 0.50 NCB N/A N/A N/A N/A N/A N/A 2008 2008 2008 2008 2009 Bth/13 Kotra Page 1 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Kulwinder PRWSS/ Digital Survey of 17-NOV- Contracto 01-Oct- 08-Oct- 02-Feb- 8 Services/ A Village Nandgarh 0.50 NS N/A 17-NOV-2008 N/A 2008/0.50/ 30 r Ambala 0.31 2008 2008 2009 Bth/13 Kotra INR Cantt. / 0 / Indian PRWSS/ Digital Survey of 31-Jan- 03-Mar- 18-Mar- 20-03- 31-May- 9 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Mahi Nangal 2008 2008 2008 2008 2008 Bth/14 Girish Kumar PRWSS/ 20-MAR- Digital Survey of 03-Mar- 18-Mar- Contracto 31-May- 10 Services/ A 0.50 NS N/A 20-MAR-2008 N/A 2008/0.50/ 17 0.48 Village Mahi Nangal 2008 2008 r Ambala. 2008 Bth/14 INR /0/ Indian PRWSS/ Digital Survey of 31-Jan- 03-Mar- 18-Mar- 20-03- 31-May- 11 Services/ P Village Behman Kaur 0.50 NCB N/A N/A N/A N/A N/A N/A 2008 2008 2008 2008 2008 Bth/15 Singh Girish Kumar PRWSS/ Digital Survey of 20-MAR- 03-Mar- 18-Mar- Contracto 31-May- 12 Services/ A Village Behman Kaur 0.50 NS N/A 20-MAR-2008 N/A 2008/0.50/ 12 0.48 2008 2008 r Ambala. 2008 Bth/15 Singh INR /0/ Indian PRWSS/ Digital Survey of 31-Jan- 03-Mar- 18-Mar- 20-03- 31-May- 13 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Rayia 2008 2008 2008 2008 2008 Bth/16 Girish Kumar PRWSS/ 20-MAR- Digital Survey of 03-Mar- 18-Mar- Contracto 31-May- 14 Services/ A 0.50 NS N/A 20-MAR-2008 N/A 2008/0.50/ 14 0.33 Village Rayia 2008 2008 r Ambala. 2008 Bth/16 INR /0/ Indian PRWSS/ Digital Survey of 02-Feb- 04-Mar- 11-Mar- 31-03- 12-Apr- 15 Services/ P Village Harnam 0.50 NCB N/A N/A N/A N/A N/A N/A 2008 2008 2008 2008 2008 Bth/17 Singh Wala Page 2 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Kulwinder PRWSS/ Digital Survey of 31-MAR- Contracto 04-Mar- 11-Mar- 12-Apr- 16 Services/ A Village Harnam 0.50 NS N/A 31-MAR-2008 N/A 2008/0.50/ 15 r Ambala 0.35 2008 2008 2008 Bth/17 Singh Wala INR Cantt. / 0 / Indian PRWSS/ Digital Survey of 01-Aug- 04-Sep- 14-Sep- 27-09- 12-Oct- 17 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Phulewala 2007 2007 2007 2007 2007 Bth/18 Jatinder PRWSS/ 27-SEP- Digital Survey of 04-Sep- 14-Sep- Singh 12-Oct- 18 Services/ A 0.50 NS N/A 27-SEP-2007 N/A 2007/0.50/ 35 0.50 Village Phulewala 2007 2007 Ambala / 2007 Bth/18 INR 0 / Indian PRWSS/ Digital Survey of 31-Jan- 13-Mar- 28-Mar- 18-06- 28-Jun- 19 Services/ P 0.75 NCB N/A N/A N/A N/A N/A N/A Village Balloh 2008 2008 2008 2008 2008 Bth/19 Kulwinder PRWSS/ 18-JUN- Contracto Digital Survey of 13-Mar- 28-Mar- 28-Jun- 20 Services/ A 0.75 NS N/A 18-JUN-2008 N/A 2008/0.75/ 30 r Ambala 0.70 Village Balloh 2008 2008 2008 Bth/19 INR Cantt. / 0 / Indian PRWSS/ 04-Nov- 20-Nov- 25-11- 20-Mar- 21 Services/ P Wall Writing 0.80 NCB N/A N/A N/A N/A N/A N/A 2008 2008 2008 2009 Bth/2 Sohal Kamal & Art PRWSS/ 25-NOV- 04-Nov- 20-Nov- Advertisin 20-Mar- 22 Services/ A Wall Writing 0.80 NS N/A 25-NOV-2008 N/A 2008/0.80/ spl 0.69 2008 2008 g, 2009 Bth/2 INR Bathinda /0/ Indian PRWSS/ Digital Survey of 01-Aug- 04-Sep- 14-Sep- 11-03- 28-Mar- 23 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Sidhana 2007 2007 2007 2008 2008 Bth/20 Page 3 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Jatinder PRWSS/ 11-MAR- Digital Survey of 04-Sep- 14-Sep- Singh 28-Mar- 24 Services/ A 0.50 NS N/A 11-MAR-2008 N/A 2008/0.50/ 13 0.37 Village Sidhana 2007 2007 Ambala / 2008 Bth/20 INR 0 / Indian PRWSS/ Digital Survey of 10-Aug- 25-Sep- 15-Oct- 21-10- 31-Dec- 25 Services/ P 0.60 NCB N/A N/A N/A N/A N/A N/A Village Sukladhi 2008 2008 2008 2008 2008 Bth/21 Shivam Engineer s PRWSS/ 21-OCT- Digital Survey of 25-Sep- 15-Oct- Associate 31-Dec- 26 Services/ A 0.60 NS N/A 21-OCT-2008 N/A 2008/0.60/ 26 0.53 Village Sukladhi 2008 2008 s 2008 Bth/21 INR Panchkul a/0/ Indian PRWSS/ Digital Survey of 10-Aug- 25-Sep- 15-Oct- 21-10- 31-Dec- 27 Services/ P 0.60 NCB N/A N/A N/A N/A N/A N/A Village Bagha 2008 2008 2008 2008 2008 Bth/22 Shivam Engineer s PRWSS/ 21-OCT- Digital Survey of 25-Sep- 15-Oct- Associate 31-Dec- 28 Services/ A 0.60 NS N/A 21-OCT-2008 N/A 2008/0.60/ 25 0.54 Village Bagha 2008 2008 s 2008 Bth/22 INR Panchkul a/0/ Indian PRWSS/ Digital Survey of 08-Oct- 20-Nov- 20-Nov- 09-04- 20-Aug- 29 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Pirkot 2008 2008 2008 2009 2009 Bth/23 Kulwinder PRWSS/ 09-APR- Contracto Digital Survey of 20-Nov- 20-Nov- 20-Aug- 30 Services/ A 0.50 NS N/A 09-APR-2009 N/A 2009/0.50/ 8 r Ambala 0.35 Village Pirkot 2008 2008 2009 Bth/23 INR Cantt. / 0 / Indian PRWSS/ Digital Survey of 01-Feb- 03-Mar- 19-Mar- 20-03- 31-May- 31 Services/ P Village Gurusar 0.50 NCB N/A N/A N/A N/A N/A N/A 2008 2008 2008 2008 2008 Bth/24 jagga Page 4 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Girish Kumar PRWSS/ Digital Survey of 20-MAR- 03-Mar- 19-Mar- Contracto 31-May- 32 Services/ A Village Gurusar 0.50 NS N/A 20-MAR-2008 N/A 2008/0.50/ 16 0.33 2008 2008 r Ambala. 2008 Bth/24 jagga INR /0/ Indian PRWSS/ Digital Survey of 02-Feb- 04-Mar- 18-Mar- 20-06- 03-Jul- 33 Services/ P 0.82 NCB N/A N/A N/A N/A N/A N/A Village Bhagi Bander 2008 2008 2008 2008 2008 Bth/25 Shivam Engineer s PRWSS/ 20-JUN- Digital Survey of 04-Mar- 18-Mar- Associate 03-Jul- 34 Services/ A 0.82 NS N/A 20-JUN-2008 N/A 2008/0.82/ 35 0.81 Village Bhagi Bander 2008 2008 s 2008 Bth/25 INR Panchkul a/0/ Indian PRWSS/ Digital Survey of 25-Oct- 20-Nov- 01-Dec- 15-12- 31-Mar- 35 Services/ P 1.00 NCB N/A N/A N/A N/A N/A N/A Village Phullo Khari 2008 2008 2008 2008 2009 Bth/26 Shri Bala ji PRWSS/ 15-DEC- Construct Digital Survey of 20-Nov- 01-Dec- 31-Mar- 36 Services/ A 1.00 NS N/A 15-DEC-2008 N/A 2008/1.00/ 24 ion Co. 0.48 Village Phullo Khari 2008 2008 2009 Bth/26 INR Chandiga rh / 0 / Indian PRWSS/ Digital Survey of 10-Sep- 19-Oct- 09-Nov- 10-10- 24-Nov- 37 Services/ P 0.65 NCB N/A N/A N/A N/A N/A N/A Village Kaile Bander 2009 2009 2009 2009 2009 Bth/27 Shivam Engineer s PRWSS/ 10-OCT- Digital Survey of 19-Oct- 09-Nov- Associate 24-Nov- 38 Services/ A 0.65 NS N/A 10-OCT-2009 N/A 2009/0.65/ 50 0.62 Village Kaile Bander 2009 2009 s 2009 Bth/27 INR Panchkul a/0/ Indian Page 5 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey of 10-Sep- 11-Sep- 24-Sep- 30-09- 15-Oct- 39 Services/ P Village Bhaini 0.45 NCB N/A N/A N/A N/A N/A N/A 2009 2009 2009 2009 2009 Bth/28 Chuhar Kulwinder PRWSS/ Digital Survey of 30-SEP- Contracto 11-Sep- 24-Sep- 15-Oct- 40 Services/ A Village Bhaini 0.45 NS N/A 30-SEP-2009 N/A 2009/0.45/ 12 r Ambala 0.36 2009 2009 2009 Bth/28 Chuhar INR Cantt. / 0 / Indian PRWSS/ Digital Survey of 11-Oct- 20-Nov- 01-Dec- 15-12- 31-Mar- 41 Services/ P 0.60 NCB N/A N/A N/A N/A N/A N/A Village Gattwali 2008 2008 2008 2008 2009 Bth/29 Shri Bala ji PRWSS/ 15-DEC- Construct Digital Survey of 20-Nov- 01-Dec- 31-Mar- 42 Services/ A 0.60 NS N/A 15-DEC-2008 N/A 2008/0.60/ 23 ion Co. 0.48 Village Gattwali 2008 2008 2009 Bth/29 INR Chandiga rh / 0 / Indian PRWSS/ 04-Nov- 07-Nov- 07-11- 04-Feb- 43 Services/ P Street Play 0.40 NCB N/A N/A N/A N/A N/A N/A 2008 2008 2008 2009 Bth/3 Performer s PRWSS/ 07-NOV- Associati 04-Nov- 07-Nov- 04-Feb- 44 Services/ A Street Play 0.40 NS N/A 07-NOV-2008 N/A 2008/0.35/ 941 on 0.35 2008 2008 2009 Bth/3 INR Punjab, Ropar / 0 / Indian PRWSS/ Digital Survey of 20-Aug- 22-Sep- 12-Oct- 03-12- 22-Jan- 45 Services/ P 0.40 NCB N/A N/A N/A N/A N/A N/A Village Gill Khurd 2009 2009 2009 2009 2010 Bth/30 Kulwinder PRWSS/ 03-DEC- Contracto Digital Survey of 22-Sep- 12-Oct- 22-Jan- 46 Services/ A 0.40 NS N/A 03-DEC-2009 N/A 2009/0.40/ 25 r Ambala 0.38 Village Gill Khurd 2009 2009 2010 Bth/30 INR Cantt. / 0 / Indian Page 6 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey of 20-Aug- 23-Sep- 30-Sep- 01-10- 15-Feb- 47 Services/ P 0.51 NCB N/A N/A N/A N/A N/A N/A Village Bugran 2009 2009 2009 2009 2010 Bth/31 AKSS Consulta nts & PRWSS/ 01-OCT- Digital Survey of 23-Sep- 30-Sep- Engineer 15-Feb- 48 Services/ A 0.51 NS N/A 01-OCT-2009 N/A 2009/0.51/ 16 0.51 Village Bugran 2009 2009 s 2010 Bth/31 INR Bathinda /0/ Indian PRWSS/ Digital Survey of 29-Jun- 24-Jul- 04-Aug- 25-09- 12-Oct- 49 Services/ P Village Gehri Bara 0.80 NCB N/A N/A N/A N/A N/A N/A 2008 2008 2008 2008 2008 Bth/32 Singh Kulwinder PRWSS/ Digital Survey of 25-SEP- Contracto 24-Jul- 04-Aug- 11-Oct- 50 Services/ A Village Gehri Bara 0.80 NS N/A 25-SEP-2008 N/A 2008/0.80/ 4510 r Ambala 0.75 2008 2008 2008 Bth/32 Singh INR Cantt. / 0 / Indian PRWSS/ Digital Survey of 05-Feb- 03-Mar- 17-Mar- 15-06- 02-Jul- 51 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Chanarthal 2008 2008 2008 2008 2008 Bth/33 M/s Futura Design & PRWSS/ 15-JUN- Consulta Digital Survey of 03-Mar- 17-Mar- 02-Jul- 52 Services/ A 0.50 NS N/A 15-JUN-2008 N/A 2008/0.50/ 3261 nts Pvt. 0.43 Village Chanarthal 2008 2008 2008 Bth/33 INR Ltd. Ludhiana /0/ Indian PRWSS/ Digital Survey of 10-Apr- 08-May- 15-May- 18-06- 30-Jun- 53 Services/ P Village Maur Charat 0.50 NCB N/A N/A N/A N/A N/A N/A 2008 2008 2008 2008 2008 Bth/34 Singh Kulwinder PRWSS/ Digital Survey of 18-JUN- 08-May- 15-May- Contracto 30-Jun- 54 Services/ A Village Maur Charat 0.50 NS N/A 18-JUN-2008 N/A 2008/0.50/ 2495 0.48 2008 2008 r Ambala 2008 Bth/34 Singh INR Cantt. / 0 Page 7 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 / Indian PRWSS/ Digital Survey of 15-Aug- 26-Sep- 07-Oct- 14-10- 18-Jan- 55 Services/ P 1.00 NCB N/A N/A N/A N/A N/A N/A Village Siryewala 2008 2008 2008 2008 2009 Bth/35 Kulwinder PRWSS/ 14-OCT- Contracto Digital Survey of 26-Sep- 07-Oct- 17-Jan- 56 Services/ A 1.00 NS N/A 14-OCT-2008 N/A 2008/1.00/ 6 r Ambala 0.96 Village Siryewala 2008 2008 2009 Bth/35 INR Cantt. / 0 / Indian PRWSS/ Digital Survey of 18-Jan- 27-Feb- 08-Mar- 28-03- 30-Apr- 57 Services/ P Village Kaur Singh 0.60 NCB N/A N/A N/A N/A N/A N/A 2008 2008 2008 2008 2008 Bth/36 Wala Gulati PRWSS/ Digital Survey of 28-MAR- Associati 27-Feb- 08-Mar- 30-Apr- 58 Services/ A Village Kaur Singh 0.60 NS N/A 28-MAR-2008 N/A 2008/0.60/ 19 on Mohali 0.56 2008 2008 2008 Bth/36 Wala INR /0/ Indian PRWSS/ Digital Survey of 20-Oct- 11-Nov- 21-Nov- 09-04- 13-Apr- 59 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Ghaso Khana 2008 2008 2008 2009 2009 Bth/37 Kulwinder PRWSS/ 09-APR- Contracto Digital Survey of 11-Nov- 21-Nov- 13-Apr- 60 Services/ A 0.50 NS N/A 09-APR-2009 N/A 2009/0.50/ 2401 r Ambala 0.25 Village Ghaso Khana 2008 2008 2009 Bth/37 INR Cantt. / 0 / Indian PRWSS/ Digital Survey of 20-Oct- 11-Nov- 21-Nov- 09-04- 24-Aug- 61 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Yatri 2008 2008 2008 2009 2009 Bth/38 Kulwinder PRWSS/ 09-APR- Contracto Digital Survey of 11-Nov- 21-Nov- 24-Aug- 62 Services/ A 0.50 NS N/A 09-APR-2009 N/A 2009/0.50/ 2403 r Ambala 0.25 Village Yatri 2008 2008 2009 Bth/38 INR Cantt. / 0 / Indian Page 8 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey of 18-Jan- 27-Feb- 08-Mar- 28-03- 30-Apr- 63 Services/ P Village Burj Ladha 0.75 NCB N/A N/A N/A N/A N/A N/A 2008 2008 2008 2008 2008 Bth/39 singh Wala Gulati PRWSS/ Digital Survey of 28-MAR- Associati 27-Feb- 08-Mar- 30-Apr- 64 Services/ A Village Burj Ladha 0.75 NS N/A 28-MAR-2008 N/A 2008/0.75/ 20 on Mohali 0.75 2008 2008 2008 Bth/39 singh Wala INR /0/ Indian PRWSS/ Video Graphy of 09-Jun- 09-Jun- 09-06- 13-Oct- 65 Services/ P 0.18 NCB N/A N/A N/A N/A N/A N/A Road Shows 2009 2009 2009 2009 Bth/4 Sahota Studio, PRWSS/ 09-JUN- Court Video Graphy of 09-Jun- 09-Jun- 13-Oct- 66 Services/ A 0.18 NS N/A 09-JUN-2009 N/A 2009/0.18/ 84 Road, 0.17 Road Shows 2009 2009 2009 Bth/4 INR Bathinda /0/ Indian PRWSS/ Digital Survey of 01-May- 04-Jun- 12-Jun- 21-07- 05-Aug- 67 Services/ P Village Bhai 0.75 NCB N/A N/A N/A N/A N/A N/A 2009 2009 2009 2009 2009 Bth/40 Bakhtaur Kulwinder PRWSS/ Digital Survey of 21-JUL- Contracto 04-Jun- 12-Jun- 05-Aug- 68 Services/ A Village Bhai 0.75 NS N/A 21-JUL-2009 N/A 2009/0.75/ 4814 r Ambala 0.55 2009 2009 2009 Bth/40 Bakhtaur INR Cantt. / 0 / Indian PRWSS/ Digital Survey of 16-Oct- 11-Nov- 21-Nov- 08-04- 14-Apr- 69 Services/ P Village Jodhpur 0.80 NCB N/A N/A N/A N/A N/A N/A 2008 2008 2008 2009 2009 Bth/41 Pakhar Kulwinder PRWSS/ Digital Survey of 08-APR- Contracto 11-Nov- 21-Nov- 14-Apr- 70 Services/ A Village Jodhpur 0.80 NS N/A 08-APR-2009 N/A 2009/0.80/ 2399 r Ambala 0.66 2008 2008 2009 Bth/41 Pakhar INR Cantt. / 0 / Indian Page 9 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey of 01-May- 04-Jun- 12-Jun- 21-07- 29-Aug- 71 Services/ P 0.40 NCB N/A N/A N/A N/A N/A N/A Village Marri 2009 2009 2009 2009 2009 Bth/42 Kulwinder PRWSS/ 21-JUL- Contracto Digital Survey of 04-Jun- 12-Jun- 29-Aug- 72 Services/ A 0.40 NS N/A 21-JUL-2009 N/A 2009/0.40/ 4810 r Ambala 0.35 Village Marri 2009 2009 2009 Bth/42 INR Cantt. / 0 / Indian PRWSS/ Digital Survey of 11-Sep- 01-Oct- 07-Oct- 08-11- 12-Feb- 73 Services/ P Village Rai Khana & 0.80 NCB N/A N/A N/A N/A N/A N/A 2008 2008 2008 2008 2009 Bth/43 Manak Khana Kulwinder PRWSS/ Digital Survey of 08-NOV- Contracto 01-Oct- 07-Oct- 12-Feb- 74 Services/ A Village Rai Khana & 0.80 NS N/A 08-NOV-2008 N/A 2008/0.80/ 6545 r Ambala 0.80 2008 2008 2009 Bth/43 Manak Khana INR Cantt. / 0 / Indian PRWSS/ Digital Survey of 15-Feb- 18-Mar- 25-Mar- 23-04- 17-May- 75 Services/ P Village Dhan Singh 0.50 NCB N/A N/A N/A N/A N/A N/A 2008 2010 2010 2010 2010 Bth/44 Khana Kulwinder PRWSS/ Digital Survey of 23-APR- Contracto 18-Mar- 25-Mar- 17-May- 76 Services/ A Village Dhan Singh 0.50 NS N/A 23-APR-2010 N/A 2010/0.50/ 2208 r Ambala 0.43 2010 2010 2010 Bth/44 Khana INR Cantt. / 0 / Indian PRWSS/ Digital Survey of 25-Feb- 25-Feb- 05-Mar- 12-03- 27-Mar- 77 Services/ P 0.60 NCB N/A N/A N/A N/A N/A N/A Village Kot Guru 2008 2008 2008 2008 2008 Bth/45 M/s Futura Design & PRWSS/ 12-MAR- Consulta Digital Survey of 25-Feb- 05-Mar- 27-Mar- 78 Services/ A 0.60 NS N/A 12-MAR-2008 N/A 2008/0.60/ 38 nts Pvt. 0.60 Village Kot Guru 2008 2008 2008 Bth/45 INR Ltd. Ludhiana /0/ Indian Page 10 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey of 01-Sep- 01-Sep- 14-Sep- 18-09- 25-Sep- 79 Services/ P 0.56 NCB N/A N/A N/A N/A N/A N/A Village Bhaini 2008 2008 2008 2008 2008 Bth/46 Shivam Engineer s PRWSS/ 18-SEP- Digital Survey of 01-Sep- 14-Sep- Associate 25-Sep- 80 Services/ A 0.56 NS N/A 18-SEP-2008 N/A 2008/0.56/ 33 0.56 Village Bhaini 2008 2008 s 2008 Bth/46 INR Panchkul a/0/ Indian PRWSS/ Digital Survey of 15-Feb- 15-Feb- 25-Feb- 04-03- 19-Mar- 81 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Mehma Swai 2008 2008 2008 2008 2008 Bth/47 M/s Futura Design & PRWSS/ 04-MAR- Consulta Digital Survey of 15-Feb- 25-Feb- 19-Mar- 82 Services/ A 0.50 NS N/A 04-MAR-2008 N/A 2008/0.50/ 32 nts Pvt. 0.50 Village Mehma Swai 2008 2008 2008 Bth/47 INR Ltd. Ludhiana /0/ Indian PRWSS/ Digital Survey of 16-Jan- 16-Jan- 21-Jan- 25-01- 21-Feb- 83 Services/ P 0.52 NCB N/A N/A N/A N/A N/A N/A Village Pacca Khurd 2008 2008 2008 2008 2008 Bth/48 M/s Futura Design & PRWSS/ 25-JAN- Consulta Digital Survey of 16-Jan- 21-Jan- 21-Feb- 84 Services/ A 0.52 NS N/A 25-JAN-2008 N/A 2008/0.52/ 29 nts Pvt. 0.52 Village Pacca Khurd 2008 2008 2008 Bth/48 INR Ltd. Ludhiana /0/ Indian PRWSS/ Digital Survey of 07-Aug- 07-Aug- 27-Aug- 27-08- 14-Sep- 85 Services/ P Village Mehma 0.49 NCB N/A N/A N/A N/A N/A N/A 2009 2009 2009 2009 2009 Bth/49 Bhagwana Page 11 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 AKSS Consulta nts & PRWSS/ Digital Survey of 27-AUG- 07-Aug- 27-Aug- Engineer 14-Sep- 86 Services/ A Village Mehma 0.49 NS N/A 27-AUG-2009 N/A 2009/0.49/ 31 0.49 2009 2009 s 2009 Bth/49 Bhagwana INR Bathinda /0/ Indian PRWSS/ Digital Survey of 27-Jan- 27-Jan- 10-Feb- 10-02- 20-Feb- 87 Services/ P 1.11 NCB N/A N/A N/A N/A N/A N/A Village Pacca Kalan 2009 2009 2009 2009 2009 Bth/50 Shivam Engineer s PRWSS/ 10-FEB- Digital Survey of 27-Jan- 10-Feb- Associate 20-Feb- 88 Services/ A 1.11 NS N/A 10-FEB-2009 N/A 2009/1.11/ 26 1.11 Village Pacca Kalan 2009 2009 s 2009 Bth/50 INR Panchkul a/0/ Indian PRWSS/ Digital Survey of 26-Feb- 26-Feb- 08-Mar- 08-02- 28-Apr- 89 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Deon 2010 2010 2010 2010 2010 Bth/51 AKSS Consulta nts & PRWSS/ 08-MAR- Digital Survey of 26-Feb- 08-Mar- Engineer 28-Apr- 90 Services/ A 0.50 NS N/A 08-MAR-2010 N/A 2010/0.50/ 7 0.50 Village Deon 2010 2010 s 2010 Bth/51 INR Bathinda /0/ Indian PRWSS/ Digital Survey of 14-Jul- 16-Aug- 23-Aug- 01-09- 91 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Aklia Jalal 2010 2010 2010 2010 Bth/52 PRWSS/ Digital Survey of 92 Services/ A N/A N/A Village Aklia Jalal Bth/52 Page 12 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey of 20-Jul- 23-Aug- 30-Aug- 11-09- 93 Services/ P Village Bhagta Bhai 1.00 NCB N/A N/A N/A N/A N/A N/A 2010 2010 2010 2010 Bth/53 Ka PRWSS/ Digital Survey of 23-Aug- 30-Aug- 94 Services/ A Village Bhagta Bhai 1.00 NS N/A N/A 2010 2010 Bth/53 Ka PRWSS/ Digital Survey of 16-Jul- 18-Aug- 25-Aug- 08-09- 95 Services/ P Village Dial Pura 0.75 NCB N/A N/A N/A N/A N/A N/A 2010 2010 2010 2010 Bth/54 Bhai Ka PRWSS/ Digital Survey of 96 Services/ A Village Dial Pura N/A N/A Bth/54 Bhai Ka PRWSS/ Digital Survey of 10-Aug- 13-Sep- 20-Sep- 11-10- 97 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Gumti Kalan 2010 2010 2010 2010 Bth/55 PRWSS/ Digital Survey of 98 Services/ A N/A N/A Village Gumti Kalan Bth/55 PRWSS/ Digital Survey of 10-Aug- 14-Sep- 21-Sep- 11-10- 99 Services/ P Village Kesar Singh 0.50 NCB N/A N/A N/A N/A N/A N/A 2010 2010 2010 2010 Bth/56 Wala PRWSS/ Digital Survey of 100 Services/ A Village Kesar Singh N/A N/A Bth/56 Wala PRWSS/ Digital Survey of 30-Aug- 24-Sep- 04-Oct- 25-11- 101 Services/ P 1.00 NCB N/A N/A N/A N/A N/A N/A Village Kotha Guru 2010 2010 2010 2010 Bth/57 Page 13 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey of 102 Services/ A N/A N/A Village Kotha Guru Bth/57 PRWSS/ Digital Survey of 14-Sep- 04-Oct- 11-Oct- 25-11- 103 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Kotli Khurd 2010 2010 2010 2010 Bth/58 Kulwinder PRWSS/ 25-NOV- Contracto Digital Survey of 04-Oct- 11-Oct- 29-Dec- 104 Services/ A 0.50 NS N/A 25-NOV-2010 N/A 2010/0.70/ 36 r Ambala 0.50 Village Kotli Khurd 2010 2010 2010 Bth/58 INR Cantt. / 0 / Indian PRWSS/ Digital Survey of 09-Jun- 19-Jul- 02-Aug- 24-Sep- 105 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Giana 2010 2010 2010 2010 Bth/59 PRWSS/ Digital Survey of 106 Services/ A N/A N/A Village Giana Bth/59 PRWSS/ Slogan Writing on 18-Nov- 25-Nov- 15-12- 30-Mar- 107 Services/ P 0.07 NCB N/A N/A N/A N/A N/A N/A Walls 2009 2009 2009 2010 Bth/6 Sohal Kamal & Art PRWSS/ 15-DEC- Slogan Writing on 18-Nov- 25-Nov- Advertisin 30-Mar- 108 Services/ A 0.07 NS N/A 15-DEC-2009 N/A 2009/0.07/ 632 0.07 Walls 2009 2009 g, 2010 Bth/6 INR Bathinda /0/ Indian PRWSS/ Digital Survey of 13-May- 26-Jun- 08-Jul- 29-Aug- 109 Services/ P Village Rattangarh 0.50 NCB N/A N/A N/A N/A N/A N/A 2010 2010 2010 2010 Bth/60 kanakwal PRWSS/ Digital Survey of 26-Jun- 08-Jul- 110 Services/ A Village Rattangarh 0.50 NS N/A N/A 2010 2010 Bth/60 kanakwal Page 14 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey of 21-May- 08-Jun- 21-Jun- 20-Aug- 111 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Lehri 2010 2010 2010 2010 Bth/61 Shivam Engineer s PRWSS/ 20-AUG- Digital Survey of 08-Jun- 21-Jun- Associate 08-Oct- 112 Services/ A 0.50 NS N/A 20-AUG-2010 N/A 2010/0.70/ 4598 0.50 Village Lehri 2010 2010 s 2010 Bth/61 INR Panchkul a/0/ Indian PRWSS/ Digital Survey of 20-Jun- 30-Jun- 11-Jul- 19-Aug- 113 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Sangat Khurd 2010 2010 2010 2010 Bth/62 PRWSS/ Digital Survey of 114 Services/ A N/A N/A Village Sangat Khurd Bth/62 PRWSS/ Digital Survey of 12-Jun- 25-Jun- 08-Jul- 22-Aug- 115 Services/ P Village Teona 0.50 NCB N/A N/A N/A N/A N/A N/A 2010 2010 2010 2010 Bth/63 Pujarian PRWSS/ Digital Survey of 116 Services/ A Village Teona N/A N/A Bth/63 Pujarian PRWSS/ Digital Survey of 03-Jul- 23-Jul- 08-Aug- 20-Oct- 117 Services/ P Village Jeon Singh 0.50 NCB N/A N/A N/A N/A N/A N/A 2010 2010 2010 2010 Bth/64 Wala PRWSS/ Digital Survey of 118 Services/ A Village Jeon Singh N/A N/A Bth/64 Wala PRWSS/ Digital Survey of 05-Jun- 25-Jun- 12-Jul- 01-Sep- 119 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Badiala 2010 2010 2010 2010 Bth/65 Page 15 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey of 120 Services/ A N/A N/A Village Badiala Bth/65 PRWSS/ Digital Survey of 09-Jul- 29-Jul- 16-Aug- 22-Sep- 121 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Mansa khurd 2010 2010 2010 2010 Bth/66 PRWSS/ Digital Survey of 122 Services/ A N/A N/A Village Mansa khurd Bth/66 PRWSS/ Digital Survey of 15-Jul- 01-Aug- 18-Aug- 30-Sep- 123 Services/ P Village 0.50 NCB N/A N/A N/A N/A N/A N/A 2010 2010 2010 2010 Bth/67 Rampura/Balianwali PRWSS/ Digital Survey of 124 Services/ A Village N/A N/A Bth/67 Rampura/Balianwali PRWSS/ Digital Survey of 19-Jul- 26-Jul- 08-Aug- 22-Sep- 125 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Such 2010 2010 2010 2010 Bth/68 PRWSS/ Digital Survey of 26-Jul- 08-Aug- 126 Services/ A 0.50 NS N/A N/A Village Such 2010 2010 Bth/68 PRWSS/ Digital Survey of 25-Jul- 11-Aug- 26-Aug- 21-Oct- 127 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Nangla 2010 2010 2010 2010 Bth/69 Shivam Engineer s PRWSS/ 22-AUG- Digital Survey of 11-Aug- 26-Aug- Associate 21-Oct- 128 Services/ A 0.50 NS N/A 22-AUG-2010 N/A 2010/0.50/ 4557 0.50 Village Nangla 2010 2010 s 2010 Bth/69 INR Panchkul a/0/ Indian Page 16 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ 18-Nov- 03-Dec- 04-12- 17-Dec- 129 Services/ P Puppet Show 0.12 NCB N/A N/A N/A N/A N/A N/A 2009 2009 2009 2009 Bth/7 Badri PRWSS/ 04-DEC- Bhutt, 18-Nov- 03-Dec- 17-Dec- 130 Services/ A Puppet Show 0.12 NS N/A 04-DEC-2009 N/A 2009/0.50/ 592 Chandiga 0.11 2009 2009 2009 Bth/7 INR rh / 0 / Indian PRWSS/ Digital Survey of 19-Jun- 01-Jul- 12-Jul- 18-Sep- 131 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Tarangwali 2010 2010 2010 2010 Bth/70 PRWSS/ Digital Survey of 132 Services/ A N/A N/A Village Tarangwali Bth/70 PRWSS/ Digital Survey of 28-Jun- 22-Jul- 09-Aug- 01-Oct- 133 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Lelewala 2010 2010 2010 2010 Bth/71 PRWSS/ Digital Survey of 134 Services/ A N/A N/A Village Lelewala Bth/71 PRWSS/ Digital Survey of 01-Jun- 20-Jun- 01-Jul- 25-Sep- 135 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Singo 2010 2010 2010 2010 Bth/72 PRWSS/ Digital Survey of 136 Services/ A N/A N/A Village Singo Bth/72 PRWSS/ Digital Survey of 25-Jun- 15-Jul- 27-Jul- 26-Sep- 137 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Sekhpura 2010 2010 2010 2010 Bth/73 Page 17 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey of 138 Services/ A N/A N/A Village Sekhpura Bth/73 PRWSS/ Digital Survey of 02-Jul- 29-Jul- 12-Aug- 10-Oct- 139 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Jandhu ke 2010 2010 2010 2010 Bth/74 PRWSS/ Digital Survey of 140 Services/ A N/A N/A Village Jandhu ke Bth/74 PRWSS/ Digital Survey of 25-Jul- 12-Aug- 25-Sep- 20-Nov- 141 Services/ P Village 0.50 NCB N/A N/A N/A N/A N/A N/A 2010 2010 2010 2010 Bth/75 Harkishanpura PRWSS/ Digital Survey of 142 Services/ A Village N/A N/A Bth/75 Harkishanpura PRWSS/ Digital Survey of 17-Jul- 09-Aug- 24-Aug- 29-Oct- 143 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Daulatpura 2010 2010 2010 2010 Bth/76 PRWSS/ Digital Survey of 144 Services/ A N/A N/A Village Daulatpura Bth/76 PRWSS/ Digital Survey of 11-Jul- 15-Aug- 29-Sep- 28-Nov- 145 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Kaloke 2010 2010 2010 2010 Bth/77 PRWSS/ Digital Survey of 146 Services/ A N/A N/A Village Kaloke Bth/77 Page 18 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey of 20-Jun- 20-Jul- 10-Aug- 29-Sep- 147 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Mehma Sarja 2010 2010 2010 2010 Bth/78 PRWSS/ Digital Survey of 20-Jul- 10-Aug- 148 Services/ A 0.50 NS N/A N/A Village Mehma Sarja 2010 2010 Bth/78 PRWSS/ Digital Survey of 20-Jun- 20-Jul- 10-Aug- 29-Sep- 149 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Jandha Wala 2010 2010 2010 2010 Bth/79 PRWSS/ Digital Survey of 150 Services/ A N/A N/A Village Jandha Wala Bth/79 PRWSS/ 18-Nov- 03-Dec- 02-01- 05-Mar- 151 Services/ P Nukkar Natak 0.35 NCB N/A N/A N/A N/A N/A N/A 2009 2009 2010 2010 Bth/8 Bathinda Art PRWSS/ 02-JAN- 18-Nov- 03-Dec- Theatre, 05-Mar- 152 Services/ A Nukkar Natak 0.35 NS N/A 02-JAN-2010 N/A 2010/0.07/ spl 0.07 2009 2009 Bathinda 2010 Bth/8 INR /0/ Indian PRWSS/ Digital Survey of 20-Jun- 20-Jul- 10-Aug- 29-Sep- 153 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Nehian wala 2010 2010 2010 2010 Bth/80 PRWSS/ Digital Survey of 154 Services/ A N/A N/A Village Nehian wala Bth/80 PRWSS/ Digital Survey of 09-Jun- 19-Jul- 02-Aug- 20-Sep- 155 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Tarangwali 2010 2010 2010 2010 Bth/81 Page 19 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey of 156 Services/ A N/A N/A Village Tarangwali Bth/81 PRWSS/ Digital Survey of 20-Jun- 20-Jul- 10-Aug- 29-Sep- 157 Services/ P Village Bhucho 0.50 NCB N/A N/A N/A N/A N/A N/A 2010 2010 2010 2010 Bth/82 Khurd PRWSS/ Digital Survey of 158 Services/ A Village Bhucho N/A N/A Bth/82 Khurd PRWSS/ Digital Survey of 09-Jun- 19-Jul- 02-Aug- 20-Sep- 159 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Faridkot 2010 2010 2010 2010 Bth/83 PRWSS/ Digital Survey of 160 Services/ A N/A N/A Village Faridkot Bth/83 PRWSS/ Digital Survey of 09-Jun- 19-Jul- 02-Aug- 20-Sep- 161 Services/ P 0.50 NCB N/A N/A N/A N/A N/A N/A Village Gehri Butter 2010 2010 2010 2010 Bth/84 AKSS Consulta nts & PRWSS/ 01-JUL- Digital Survey of 19-Jul- 02-Aug- Engineer 20-Sep- 162 Services/ A 0.50 NS N/A 01-JUL-2010 N/A 2010/0.44/ 6818 0.50 Village Gehri Butter 2010 2010 s 2010 Bth/84 INR Bathinda /0/ Indian PRWSS/ 06-Jul- 21-Jul- 28-07- 27-Aug- 163 Services/ P Slogan Writing 0.52 NS N/A N/A N/A N/A N/A N/A 2010 2010 2010 2010 Bth/85 S.P PRWSS/ 28-JUL- Engineeri 06-Jul- 21-Jul- 27-Aug- 164 Services/ A Slogan Writing 0.52 NS N/A 28-JUL-2010 N/A 2010/0.50/ 233 ngs & 0.52 2010 2010 2010 Bth/85 INR Contracto rs / 0 / Page 20 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Indian PRWSS/ 07-Dec- 15-Dec- 20-12- 15-Jan- 165 Services/ P Nukkar natak 0.40 NS N/A N/A N/A N/A N/A N/A 2010 2010 2010 2011 Bth/86 PRWSS/ 20-DEC- Noor Art 07-Dec- 15-Dec- 15-Jan- 166 Services/ A Nukkar natak 0.40 NS N/A 20-DEC-2010 N/A 2010/0.37/ 572 Group / 0 0.40 2010 2010 2011 Bth/86 INR / Indian PRWSS/ Digital Survey of 31-Jan- 28-Feb- 07-Mar- 19-03- 10-Apr- 167 Services/ P 0.85 NCB N/A N/A N/A N/A N/A N/A Village Tarkhanwala 2008 2008 2008 2008 2008 Bth/9 M/s Futura Design & PRWSS/ 19-MAR- Consulta Digital Survey of 28-Feb- 07-Mar- 10-Apr- 168 Services/ A 0.85 NS N/A 19-MAR-2008 N/A 2008/0.85/ 39 nts Pvt. 0.83 Village Tarkhanwala 2008 2008 2008 Bth/9 INR Ltd. Ludhiana /0/ Indian Zone: Central Zone, Circle: Bathinda Circle, District: Mansa Video Coverage of PRWSS/ Road Show(with 20-Oct- 22-Oct- 169 Services/ P DVD), Still 0.05 NS N/A N/A N/A N/A N/A N/A 2009 2009 Mns/1 Photography photo size (6"*4") Sahota Video Coverage of Studio, PRWSS/ Road Show(with 22-OCT- Court 20-Oct- 22-Oct- 05-Nov- 170 Services/ A DVD), Still 0.05 NS N/A 22-OCT-2009 N/A 2009/0.05/ 707 Road, 0.05 2009 2009 2009 Mns/1 Photography photo INR Bathinda size (6"*4") /0/ Indian Page 21 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Street Play (Nukad 24-Jun- 24-Jun- 09-Jul- 08-07- 29-Dec- 171 Services/ P 1.20 NCB N/A N/A N/A N/A N/A N/A natak) 2010 2010 2010 2010 2010 Mns/10 PRWSS/ 08-JUL- Noor Art Street Play (Nukad 24-Jun- 09-Jul- 04-Sep- 172 Services/ A 1.20 NS N/A 08-JUL-2010 N/A 2010/1.20/ 1440 Group / 0 0.82 natak) 2010 2010 2010 Mns/10 INR / Indian PRWSS/ Street Play (Nukad 10-Dec- 10-Dec- 29-Dec- 29-12- 31-Mar- 173 Services/ P 0.80 NCB N/A N/A N/A N/A N/A N/A natak) 2010 2010 2010 2010 2011 Mns/11 PRWSS/ 29-DEC- Noor Art Street Play (Nukad 10-Dec- 29-Dec- 29-Mar- 174 Services/ A 0.80 NS N/A 29-DEC-2010 N/A 2010/0.80/ 1791 Group / 0 0.72 natak) 2010 2010 2011 Mns/11 INR / Indian PRWSS/ 20-Oct- 22-Oct- 175 Services/ P Puppet Show 0.11 NS N/A N/A N/A N/A N/A N/A 2009 2009 Mns/2 Badri PRWSS/ 22-OCT- Bhutt, 20-Oct- 22-Oct- 04-Nov- 176 Services/ A Puppet Show 0.11 NS N/A 22-OCT-2009 N/A 2009/0.11/ 706 Chandiga 0.12 2009 2009 2009 Mns/2 INR rh / 0 / Indian PRWSS/ Muniyadi in various 19-Nov- 08-Dec- 177 Services/ P villages in District 0.33 NS N/A N/A N/A N/A N/A N/A 2009 2009 Mns/3 Mansa Rinkel Enterpris PRWSS/ Muniyadi in various 08-DEC- 19-Nov- 08-Dec- es,Mansa 21-Jan- 178 Services/ A villages in District 0.33 NS N/A 08-DEC-2009 N/A 2009/0.33/ 848 0.19 2009 2009 /Indian / 0 2010 Mns/3 Mansa INR / Indian PRWSS/ Wall Writing(Block 30-Dec- 15-Jan- 179 Services/ P 0.52 NS N/A N/A N/A N/A N/A N/A Bhikhi) 2009 2010 Mns/4 Page 22 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Hind Enterpris es, New PRWSS/ 15-JAN- Court Wall Writing(Block 30-Dec- 15-Jan- 25-Jan- 180 Services/ A 0.52 NS N/A 15-JAN-2010 N/A 2010/0.52/ 1059 Road, 0.52 Bhikhi) 2009 2010 2010 Mns/4 INR Mansa- 151505/In dian / 0 / Indian PRWSS/ Wall Writing(Block 30-Dec- 15-Jan- 181 Services/ P 0.52 NS N/A N/A N/A N/A N/A N/A Jhunir) 2009 2010 Mns/5 Hind Enterpris es, New PRWSS/ 15-JAN- Court Wall Writing(Block 30-Dec- 15-Jan- 17-Feb- 182 Services/ A 0.52 NS N/A 15-JAN-2010 N/A 2010/0.52/ 1074 Road, 0.52 Jhunir) 2009 2010 2010 Mns/5 INR Mansa- 151505/In dian / 0 / Indian PRWSS/ Wall Writing(Block 30-Dec- 15-Jan- 183 Services/ P 0.73 NS N/A N/A N/A N/A N/A N/A Mansa & Sardulgarh) 2009 2010 Mns/6 Hind Enterpris es, New PRWSS/ 15-JAN- Court Wall Writing(Block 30-Dec- 15-Jan- 17-Feb- 184 Services/ A 0.73 NS N/A 15-JAN-2010 N/A 2010/0.73/ 1075 Road, 0.73 Mansa & Sardulgarh) 2009 2010 2010 Mns/6 INR Mansa- 151505/In dian / 0 / Indian PRWSS/ Wall Writing(Block 30-Dec- 15-Jan- 185 Services/ P 2.03 NS N/A N/A N/A N/A N/A N/A Budhlada) 2009 2010 Mns/7 Page 23 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Hind Enterpris es, New PRWSS/ 15-JAN- Court Wall Writing(Block 30-Dec- 15-Jan- 17-Feb- 186 Services/ A 2.03 NS N/A 15-JAN-2010 N/A 2010/2.03/ 1058 Road, 2.11 Budhlada) 2009 2010 2010 Mns/7 INR Mansa- 151505/In dian / 0 / Indian PRWSS/ Street Play(Nukkar 04-Feb- 23-Feb- 187 Services/ P 0.34 NS N/A N/A N/A N/A N/A N/A Natak) 2010 2010 Mns/8 PRWSS/ 23-FEB- Noor Art Street Play(Nukkar 04-Feb- 23-Feb- 29-Mar- 188 Services/ A 0.34 NS N/A 23-FEB-2010 N/A 2010/0.34/ 1159 Group / 0 0.30 Natak) 2010 2010 2010 Mns/8 INR / Indian PRWSS/ 26-Nov- 11-Dec- 189 Services/ P Puppet Show 0.19 NS N/A N/A N/A N/A N/A N/A 2009 2009 Mns/9 Badri PRWSS/ 11-DEC- Bhutt, 26-Nov- 11-Dec- 30-Dec- 190 Services/ A Puppet Show 0.19 NS N/A 11-DEC-2009 N/A 2009/0.19/ 897 Chandiga 0.19 2009 2009 2009 Mns/9 INR rh / 0 / Indian Zone: Central Zone, Circle: Faridkot Circle, District: Faridkot PRWSS/ Digital Survey village 23-Oct- 30-Oct- 03-11- 30-Mar- 191 Services/ P 0.35 NS N/A N/A N/A N/A N/A N/A Mishriwala 2008 2008 2008 2009 Frd/10 Er. Mohpreet Singh PRWSS/ 03-NOV- Digital Survey village 23-Oct- 30-Oct- Hari Nau 192 Services/ A 0.35 NS N/A 03-NOV-2008 N/A 2008/0.35/ 11 0.35 Mishriwala 2008 2008 Road Frd/10 INR Kotkapur a/0/ Indian Page 24 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey village 27-Oct- 07-Nov- 14-11- 10-Jul- 193 Services/ P 0.56 NS N/A N/A N/A N/A N/A N/A Gobindgarh 2008 2008 2008 2009 Frd/11 AKSS Consulta nts & PRWSS/ 14-NOV- Digital Survey village 27-Oct- 07-Nov- Engineer 194 Services/ A 0.56 NS N/A 14-NOV-2008 N/A 2008/0.56/ 39 0.85 Gobindgarh 2008 2008 s Frd/11 INR Bathinda /0/ Indian PRWSS/ Digital Survey village 27-Oct- 07-Nov- 14-11- 10-Jul- 195 Services/ P 0.61 NS N/A N/A N/A N/A N/A N/A Chaina 2008 2008 2008 2009 Frd/12 AKSS Consulta nts & PRWSS/ 14-NOV- Digital Survey village 27-Oct- 07-Nov- Engineer 196 Services/ A 0.61 NS N/A 14-NOV-2008 N/A 2008/0.61/ 40 0.61 Chaina 2008 2008 s Frd/12 INR Bathinda /0/ Indian PRWSS/ Digital Survey village 27-Oct- 07-Nov- 14-11- 10-Jul- 197 Services/ P 0.71 NS N/A N/A N/A N/A N/A N/A Mallah 2008 2008 2008 2009 Frd/13 AKSS Consulta nts & PRWSS/ 14-NOV- Digital Survey village 27-Oct- 07-Nov- Engineer 198 Services/ A 0.71 NS N/A 14-NOV-2008 N/A 2008/0.71/ 35 0.71 Mallah 2008 2008 s Frd/13 INR Bathinda /0/ Indian PRWSS/ 30-Oct- 18-Nov- 19-11- 04-Dec- 199 Services/ P Wall Writing 0.35 NS N/A N/A N/A N/A N/A N/A 2008 2008 2008 2008 Frd/3 Page 25 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 M/S PRWSS/ 19-NOV- Painter 30-Oct- 18-Nov- 200 Services/ A Wall Writing 0.35 NS N/A 19-NOV-2008 N/A 2008/0.35/ 1 Kumar 0.35 2008 2008 Frd/3 INR Faridkot / 0 / Indian PRWSS/ Digital Survey village 29-Jan- 06-Feb- 03-11- 29-Jan- 201 Services/ P 0.56 NS N/A N/A N/A N/A N/A N/A Romana Albel Singh 2008 2008 2008 2009 Frd/4 Gulati PRWSS/ 03-NOV- Associati Digital Survey village 29-Jan- 06-Feb- 202 Services/ A 0.56 NS N/A 03-NOV-2008 N/A 2008/0.56/ 1 on Mohali 0.56 Romana Albel Singh 2008 2008 Frd/4 INR /0/ Indian PRWSS/ Digital Survey village 29-Jan- 06-Feb- 03-11- 29-Jan- 203 Services/ P 0.56 NS N/A N/A N/A N/A N/A N/A Gondara 2008 2008 2008 2009 Frd/5 Gulati PRWSS/ 03-NOV- Associati Digital Survey village 29-Jan- 06-Feb- 204 Services/ A 0.56 NS N/A 03-NOV-2008 N/A 2008/0.56/ 1 on Mohali 0.56 Gondara 2008 2008 Frd/5 INR /0/ Indian PRWSS/ Digital Survey village 29-Jan- 06-Feb- 03-11- 29-Jan- 205 Services/ P 0.56 NS N/A N/A N/A N/A N/A N/A Gurusar 2008 2008 2008 2009 Frd/6 Gulati PRWSS/ 03-NOV- Associati Digital Survey village 29-Jan- 06-Feb- 206 Services/ A 0.56 NS N/A 03-NOV-2008 N/A 2008/0.56/ 1 on Mohali 1.12 Gurusar 2008 2008 Frd/6 INR /0/ Indian PRWSS/ Digital Survey village 27-Oct- 07-Nov- 14-11- 12-Jan- 207 Services/ P 0.56 NS N/A N/A N/A N/A N/A N/A Ramgarh 2008 2008 2008 2009 Frd/7 AKSS PRWSS/ 14-NOV- Consulta Digital Survey village 27-Oct- 07-Nov- 208 Services/ A 0.56 NS N/A 14-NOV-2008 N/A 2008/0.56/ 33 nts & 0.56 Ramgarh 2008 2008 Frd/7 INR Engineer s Page 26 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Bathinda /0/ Indian PRWSS/ Digital Survey village 27-Oct- 07-Nov- 14-11- 12-Jan- 209 Services/ P 0.56 NS N/A N/A N/A N/A N/A N/A Karirwali 2008 2008 2008 2009 Frd/8 AKSS Consulta nts & PRWSS/ 14-NOV- Digital Survey village 27-Oct- 07-Nov- Engineer 210 Services/ A 0.56 NS N/A 14-NOV-2008 N/A 2008/0.56/ 30 0.56 Karirwali 2008 2008 s Frd/8 INR Bathinda /0/ Indian PRWSS/ Digital Survey village 27-Oct- 07-Nov- 14-11- 12-Jan- 211 Services/ P 0.56 NS N/A N/A N/A N/A N/A N/A Ramuwala 2008 2008 2008 2009 Frd/9 AKSS Consulta nts & PRWSS/ 14-NOV- Digital Survey village 27-Oct- 07-Nov- Engineer 212 Services/ A 0.56 NS N/A 14-NOV-2008 N/A 2008/0.56/ 36 0.56 Ramuwala 2008 2008 s Frd/9 INR Bathinda /0/ Indian Zone: Central Zone, Circle: Faridkot Circle, District: Moga PRWSS/ Digital Survey 27-Mar- 06-Apr- 25-Nov- 213 Services/ P 0.25 NCB N/A 13-APR-2009 N/A N/A N/A N/A N/A Bhoipur 2009 2009 2009 Mga/10 Kulwinder PRWSS/ 13-APR- Contracto Digital Survey 27-Mar- 27-Mar- 25-Nov- 214 Services/ A 0.25 NCB N/A 13-APR-2009 N/A 2009/0.25/ 16 r Ambala 0.25 Bhoipur 2009 2009 2009 Mga/10 INR Cantt. / 0 / Indian Page 27 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey Kamal 27-Mar- 06-Apr- 18-May- 215 Services/ P 0.20 NCB N/A 13-APR-2009 N/A N/A N/A N/A N/A Ke Khurd 2009 2009 2009 Mga/11 Kulwinder PRWSS/ 13-APR- Contracto Digital Survey Kamal 27-Mar- 06-Apr- 18-May- 216 Services/ A 0.20 NCB N/A 13-APR-2009 N/A 2009/0.20/ 16 r Ambala 0.20 Ke Khurd 2009 2009 2009 Mga/11 INR Cantt. / 0 / Indian PRWSS/ 16-Nov- 18-Nov- 18-Dec- 11-01- 22-Sep- 217 Services/ P Wall Writing 1.34 NCB N/A 11-JAN-2010 N/A N/A N/A N/A N/A 2009 2009 2009 2010 2010 Mga/12 PRWSS/ 11-JAN- Arun Arts 16-Nov- 18-Nov- 18-Dec- 22-Sep- 218 Services/ A Wall Writing 1.34 NCB N/A 11-JAN-2010 N/A 2010/1.34/ 15 Moga / 0 / 0.24 2009 2009 2009 2010 Mga/12 INR Indian PRWSS/ Direct 219 Services/ P Muniyadi 0.01 Contracti N/A N/A N/A N/A N/A N/A Mga/13/I ng Mehak Announc PRWSS/ Direct 01-APR- ement & 220 Services/ A Muniyadi 0.02 Contracti N/A 01-APR-2010 N/A 2010/0.01/ 14 0.02 Sound Mga/13/I ng INR Service / 0 / Indian PRWSS/ Digital Survey 27-Mar- 06-Apr- 13-04- 15-May- 221 Services/ P 0.25 NCB N/A 13-APR-2009 N/A N/A N/A N/A N/A Balkhandi 2009 2009 2009 2009 Mga/14 Kulwinder PRWSS/ 13-APR- Contracto Digital Survey 27-Mar- 06-Apr- 15-May- 222 Services/ A 0.25 NS N/A 13-APR-2009 N/A 2009/0.25/ 17 r Ambala 0.25 Balkhandi 2009 2009 2009 Mga/14 INR Cantt. / 0 / Indian PRWSS/ Digital Survey 27-Mar- 06-Apr- 13-04- 18-May- 223 Services/ P 0.25 NCB N/A 13-APR-2009 N/A N/A N/A N/A N/A Mubarkpur 2009 2009 2009 2009 Mga/15 Page 28 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Kulwinder PRWSS/ 13-APR- Contracto Digital Survey 24-Mar- 27-Mar- 06-Apr- 18-May- 224 Services/ A 0.25 NS N/A 13-APR-2009 N/A 2009/0.25/ 16 r Ambala 0.25 Mubarkpur 2009 2009 2009 2009 Mga/15 INR Cantt. / 0 / Indian PRWSS/ Digital Survey 10-Dec- 24-Dec- 30-12- 29-Jan- 225 Services/ P 0.49 NCB N/A 30-DEC-2008 N/A N/A N/A N/A N/A fatehgarh panjtoor 2008 2008 2008 2009 Mga/16 Kulwinder PRWSS/ 30-DEC- Contracto Digital Survey 08-Dec- 10-Dec- 24-Dec- 29-Jan- 226 Services/ A 0.49 NS N/A 30-DEC-2008 N/A 2008/0.49/ 17 r Ambala 0.49 fatehgarh panjtoor 2008 2008 2008 2009 Mga/16 INR Cantt. / 0 / Indian PRWSS/ digital Survey 10-Dec- 24-Dec- 30-12- 22-Jan- 227 Services/ P 0.35 ICB N/A 30-DEC-2008 N/A N/A N/A N/A N/A Bhagpur Gagra 2008 2008 2008 2009 Mga/17 Kulwinder PRWSS/ 30-DEC- Contracto digital Survey 08-Dec- 10-Dec- 24-Dec- 22-Jan- 228 Services/ A 0.35 NS N/A 30-DEC-2008 N/A 2008/0.35/ 17 r Ambala 0.35 Bhagpur Gagra 2008 2008 2008 2009 Mga/17 INR Cantt. / 0 / Indian PRWSS/ 10-Dec- 24-Dec- 30-12- 21-Jan- 229 Services/ P Digital survey Wareh 0.30 NCB N/A 30-DEC-2008 N/A N/A N/A N/A N/A 2008 2008 2008 2009 Mga/18 Kulwinder PRWSS/ 30-DEC- Contracto 08-Dec- 10-Dec- 24-Dec- 21-Jan- 230 Services/ A Digital survey Wareh 0.30 NS N/A 30-DEC-2008 N/A 2008/0.30/ 17 r Ambala 0.30 2008 2008 2008 2009 Mga/18 INR Cantt. / 0 / Indian PRWSS/ Digital Survey 10-Dec- 24-Dec- 30-12- 29-Jan- 231 Services/ P 0.30 NCB N/A 30-DEC-2008 N/A N/A N/A N/A N/A Sherpur Taiban 2008 2008 2008 2009 Mga/19 Kulwinder PRWSS/ 30-DEC- Contracto Digital Survey 10-Dec- 24-Dec- 29-Jan- 232 Services/ A 0.30 NS N/A 30-DEC-2008 N/A 2008/0.30/ 17 r Ambala 0.30 Sherpur Taiban 2008 2008 2009 Mga/19 INR Cantt. / 0 / Indian Page 29 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey Maur 10-Dec- 24-Dec- 30-12- 24-Jan- 233 Services/ P 0.35 NCB N/A 30-DEC-2008 N/A N/A N/A N/A N/A Nau Abad 2008 2008 2008 2009 Mga/20 Kulwinder PRWSS/ 30-DEC- Contracto Digital Survey Maur 10-Dec- 24-Dec- 24-Jan- 234 Services/ A 0.35 NS N/A 30-DEC-2008 N/A 2008/0.35/ 17 r Ambala 0.35 Nau Abad 2008 2008 2009 Mga/20 INR Cantt. / 0 / Indian PRWSS/ Digital Survey 10-Dec- 24-Dec- 30-12- 28-Jan- 235 Services/ P 0.50 NCB N/A 30-DEC-2008 N/A N/A N/A N/A N/A Madho Ke 2008 2008 2008 2009 Mga/21 Kulwinder PRWSS/ 30-DEC- Contracto Digital Survey 08-Dec- 10-Dec- 24-Dec- 28-Jan- 236 Services/ A 0.50 NS N/A 30-DEC-2008 N/A 2008/0.50/ 17 r Ambala 0.50 Madho Ke 2008 2008 2008 2009 Mga/21 INR Cantt. / 0 / Indian PRWSS/ 16-Nov- 17-Dec- 30-12- 28-Feb- 237 Services/ P Wall Writing 1.72 NCB N/A 30-DEC-2010 N/A N/A N/A N/A N/A 2010 2010 2010 2011 Mga/22 PRWSS/ 30-DEC- Arun Arts 13-Nov- 16-Nov- 17-Dec- 28-Feb- 238 Services/ A Wall Writing 1.72 NS N/A 30-DEC-2010 N/A 2010/1.72/ 1419 Moga / 0 / 0.77 2010 2010 2010 2011 Mga/22 INR Indian PRWSS/ 04-May- 04-Jun- 07-08- 22-Dec- 239 Services/ P Wall Writing 1.21 NCB N/A 08-JUL-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2009 Mga/3 Nirmal PRWSS/ 07-AUG- 02-May- 04-May- 04-Jun- Arts Spot 22-Dec- 240 Services/ A Wall Writing 1.21 NCB N/A 07-AUG-2009 N/A 2009/1.21/ 528 0.17 2009 2009 2009 /0/ 2009 Mga/3 INR Indian PRWSS/ Digital Survey 10-Oct- 22-Oct- 28-Nov- 241 Services/ P 0.40 NCB N/A 24-OCT-2008 N/A N/A N/A N/A N/A Talwandi Nau Bahar 2008 2008 2008 Mga/4 Page 30 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Kulwinder GPWSC PRWSS/ 24-OCT- Contracto Digital Survey 10-Oct- 22-Oct- /17 28-Nov- 242 Services/ A 0.40 NCB N/A 24-OCT-2008 N/A 2008/0.40/ r Ambala 0.25 Talwandi Nau Bahar 2008 2008 dt.10/24 2008 Mga/4 INR Cantt. / 0 /2008 / Indian PRWSS/ Digital Survey 10-Oct- 22-Oct- 24-10- 26-Nov- 243 Services/ P 0.35 NCB N/A 24-OCT-2008 N/A N/A N/A N/A N/A Mander 2008 2008 2008 2008 Mga/5 Kulwinder GPWSC PRWSS/ 24-OCT- Contracto Digital Survey 08-Oct- 10-Oct- 22-Oct- /17 26-Nov- 244 Services/ A 0.35 NCB N/A 24-OCT-2008 N/A 2008/0.35/ r Ambala 0.35 Mander 2008 2008 2008 dt.10/24 2008 Mga/5 INR Cantt. / 0 /2008 / Indian PRWSS/ Digital Survey 10-Oct- 22-Oct- 24-10- 25-Nov- 245 Services/ P 0.35 NCB N/A 24-OCT-2008 N/A N/A N/A N/A N/A Noorpur Hakima 2008 2008 2008 2008 Mga/6 Kulwinder GPWSC PRWSS/ 24-OCT- Contracto Digital Survey 08-Oct- 10-Oct- 22-Oct- /17 25-Nov- 246 Services/ A 0.35 NCB N/A 24-OCT-2008 N/A 2008/0.35/ r Ambala 0.35 Noorpur Hakima 2008 2008 2008 dt.10/24 2008 Mga/6 INR Cantt. / 0 /2008 / Indian PRWSS/ Digital Survey 10-Oct- 22-Oct- 24-10- 29-Nov- 247 Services/ P 0.30 NCB N/A 24-OCT-2008 N/A N/A N/A N/A N/A Sangla 2008 2008 2008 2008 Mga/7 Kulwinder GPWSC PRWSS/ 24-OCT- Contracto Digital Survey 10-Oct- 22-Oct- /17 29-Nov- 248 Services/ A 0.30 NCB N/A 24-OCT-2008 N/A 2008/0.30/ r Ambala 0.30 Sangla 2008 2008 dt.10/24 2008 Mga/7 INR Cantt. / 0 /2008 / Indian PRWSS/ 10-Oct- 22-Oct- 24-10- 22-Nov- 249 Services/ P Kaila 0.35 NCB N/A 24-OCT-2008 N/A N/A N/A N/A N/A 2008 2008 2008 2008 Mga/8 Kulwinder GPWSC PRWSS/ 24-OCT- Contracto 10-Oct- 22-Oct- /17 22-Nov- 250 Services/ A Kaila 0.35 NCB N/A 24-OCT-2008 N/A 2008/0.35/ r Ambala 0.35 2008 2008 dt.10/24 2008 Mga/8 INR Cantt. / 0 /2008 / Indian Page 31 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey Demru 10-Oct- 22-Oct- 24-10- 25-Jan- 251 Services/ P 0.35 NCB N/A 24-OCT-2008 N/A N/A N/A N/A N/A Khurd 2008 2008 2008 2009 Mga/9 Kulwinder GPWSC PRWSS/ 24-OCT- Contracto Digital Survey Demru 10-Oct- 22-Oct- /17 252 Services/ A 0.35 NCB N/A 24-OCT-2008 N/A 2008/0.25/ r Ambala 0.25 Khurd 2008 2008 dt.10/24 Mga/9 INR Cantt. / 0 /2008 / Indian Zone: Central Zone, Circle: Faridkot Circle, District: Muktsar PRWSS/ Digital Survey village 07-Nov- 17-Nov- 30-12- 28-Jul- 253 Services/ P 0.40 NCB N/A 30-DEC-2008 N/A N/A N/A N/A N/A Lakhmireana 2008 2008 2008 2009 Mkt/10 Sattelite PRWSS/ 30-DEC- Mapping Digital Survey village 07-Nov- 17-Nov- 28-Jul- 254 Services/ A 0.40 NS N/A 30-DEC-2008 N/A 2008/0.50/ 1 Consulta 0.40 Lakhmireana 2008 2008 2009 Mkt/10 INR nt / 0 / Indian PRWSS/ Digital Survey village 06-Nov- 17-Nov- 30-12- 28-Jul- 255 Services/ P 0.44 NCB N/A 30-DEC-2008 N/A N/A N/A N/A N/A Khane ki dhab 2008 2008 2008 2009 Mkt/11 Sattelite PRWSS/ 30-DEC- Mapping Digital Survey village 06-Nov- 17-Nov- 28-Jul- 256 Services/ A 0.44 NS N/A 30-DEC-2008 N/A 2008/0.50/ Spl 1 Consulta 0.44 Khane ki dhab 2008 2008 2009 Mkt/11 INR nt / 0 / Indian PRWSS/ Digital Survey village 01-Jan- 04-Jan- 04-01- 29-Jan- 257 Services/ P 1.22 NCB N/A 04-JAN-2010 N/A N/A N/A N/A N/A Bhullarian 2010 2010 2010 2010 Mkt/12 AKSS Consulta nts & PRWSS/ 04-JAN- Digital Survey village 01-Jan- 04-Jan- Engineer 29-Jan- 258 Services/ A 1.22 NS N/A 04-JAN-2010 N/A 2010/1.22/ 19 1.22 Bhullarian 2010 2010 s 2010 Mkt/12 INR Bathinda /0/ Indian Page 32 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey village 01-Jan- 04-Jan- 04-01- 15-Feb- 259 Services/ P 4.31 NCB N/A 04-JAN-2010 N/A N/A N/A N/A N/A Enna Khera 2010 2010 2010 2010 Mkt/13 AKSS Consulta nts & PRWSS/ 04-JAN- Digital Survey village 01-Jan- 04-Jan- Engineer 15-Feb- 260 Services/ A 4.31 NS N/A 04-JAN-2010 N/A 2010/4.31/ 37 4.31 Enna Khera 2010 2010 s 2010 Mkt/13 INR Bathinda /0/ Indian PRWSS/ Digital Survey village 11-Dec- 18-Dec- 18-12- 29-Jan- 261 Services/ P Dabwali Rahurian 1.06 NCB N/A 18-DEC-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2010 Mkt/14 wali AKSS Consulta nts & PRWSS/ Digital Survey village 18-DEC- 11-Dec- 18-Dec- Engineer 29-Jan- 262 Services/ A Dabwali Rahurian 1.06 NS N/A 18-DEC-2009 N/A 2009/1.06/ 46 1.06 2009 2009 s 2010 Mkt/14 wali INR Bathinda /0/ Indian PRWSS/ Digital Survey village 11-Dec- 18-Dec- 18-12- 17-Jan- 263 Services/ P 1.45 NCB N/A 18-DEC-2009 N/A N/A N/A N/A N/A Dhoula / Kingra 2009 2009 2009 2010 Mkt/15 AKSS Consulta nts & PRWSS/ 18-DEC- Digital Survey village 11-Dec- 18-Dec- Engineer 11-Mar- 264 Services/ A 1.45 NS N/A 18-DEC-2009 N/A 2009/1.42/ 42 1.45 Dhoula / Kingra 2009 2009 s 2010 Mkt/15 INR Bathinda /0/ Indian PRWSS/ Digital Survey village 11-Dec- 18-Dec- 18-12- 17-Jan- 265 Services/ P 2.37 NCB N/A 18-DEC-2009 N/A N/A N/A N/A N/A Channu 2009 2009 2009 2010 Mkt/16 Page 33 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 AKSS Consulta nts & PRWSS/ 18-DEC- Digital Survey village 11-Dec- 18-Dec- Engineer 19-Mar- 266 Services/ A 2.37 NS N/A 18-DEC-2009 N/A 2009/2.04/ 37 2.37 Channu 2009 2009 s 2010 Mkt/16 INR Bathinda /0/ Indian PRWSS/ Digital Survey village 14-Jan- 21-Jan- 08-02- 07-Mar- 267 Services/ P 1.56 NCB N/A 08-FEB-2010 N/A N/A N/A N/A N/A Madhar Kalan 2010 2010 2010 2010 Mkt/17 AKSS Consulta nts & PRWSS/ 08-FEB- Digital Survey village 14-Jan- 21-Jan- Engineer 26-May- 268 Services/ A 1.56 NS N/A 08-FEB-2010 N/A 2010/1.56/ 18 1.56 Madhar Kalan 2010 2010 s 2010 Mkt/17 INR Bathinda /0/ Indian PRWSS/ Digital Survey village 12-Jan- 27-Jan- 15-09- 14-Oct- 269 Services/ P 1.34 NCB N/A 15-SEP-2010 N/A N/A N/A N/A N/A Saddarwala 2010 2010 2010 2010 Mkt/18 AKSS Consulta nts & PRWSS/ 15-SEP- Digital Survey village 12-Jan- 27-Jan- Engineer 12-Nov- 270 Services/ A 1.34 NS N/A 15-SEP-2010 N/A 2010/1.34/ 38 1.34 Saddarwala 2010 2010 s 2010 Mkt/18 INR Bathinda /0/ Indian PRWSS/ Digital Survey village 04-Aug- 16-Aug- 18-08- 12-Dec- 271 Services/ P 0.73 NCB N/A 18-AUG-2010 N/A N/A N/A N/A N/A Sangrana 2010 2010 2010 2010 Mkt/19 AKSS Consulta PRWSS/ 18-AUG- nts & Digital Survey village 04-Aug- 16-Aug- 12-Dec- 272 Services/ A 0.73 NS N/A 18-AUG-2010 N/A 2010/0.73/ 34 Engineer 0.73 Sangrana 2010 2010 2010 Mkt/19 INR s Bathinda /0/ Page 34 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Indian PRWSS/ Digital Survey village 04-Aug- 16-Aug- 18-08- 26-May- 273 Services/ P 0.80 NCB N/A 18-AUG-2010 N/A N/A N/A N/A N/A Mahabadhar 2010 2010 2010 2011 Mkt/20 AKSS Consulta nts & PRWSS/ 18-AUG- Digital Survey village 04-Aug- 16-Aug- Engineer 26-May- 274 Services/ A 0.80 NS N/A 18-AUG-2010 N/A 2010/0.80/ 11 0.80 Mahabadhar 2010 2010 s 2011 Mkt/20 INR Bathinda /0/ Indian PRWSS/ Digital Survey village 11-Dec- 16-Dec- 16-12- 25-Mar- 275 Services/ P 0.80 NCB N/A 16-DEC-2008 N/A N/A N/A N/A N/A Lakhewal 2008 2008 2008 2009 Mkt/21 Shivam Engineer s PRWSS/ 16-DEC- Digital Survey village 11-Dec- 16-Dec- Associate 25-Mar- 276 Services/ A 0.80 NS N/A 16-DEC-2008 N/A 2008/0.50/ 22 0.80 Lakhewal 2008 2008 s 2009 Mkt/21 INR Panchkul a/0/ Indian PRWSS/ Digital Survey village 11-Dec- 16-Dec- 18-12- 25-Mar- 277 Services/ P 0.80 NCB N/A 18-DEC-2008 N/A N/A N/A N/A N/A Urang 2008 2008 2008 2009 Mkt/22 Shivam Engineer s PRWSS/ 18-DEC- Digital Survey village 11-Dec- 16-Dec- Associate 25-Mar- 278 Services/ A 0.80 NS N/A 18-DEC-2008 N/A 2008/0.50/ 15 0.80 Urang 2008 2008 s 2009 Mkt/22 INR Panchkul a/0/ Indian Page 35 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey village 01-Jan- 10-Jan- 10-01- 25-Jan- 279 Services/ P 0.80 NCB N/A 10-JAN-2009 N/A N/A N/A N/A N/A Bhangchari 2009 2009 2009 2009 Mkt/23 Shivam Engineer s PRWSS/ 01-DEC- Digital Survey village 07-Nov- 17-Nov- Associate 25-Mar- 280 Services/ A 0.80 NS N/A 01-DEC-2008 N/A 2008/0.50/ 12 0.80 Bhangchari 2008 2008 s 2009 Mkt/23 INR Panchkul a/0/ Indian PRWSS/ Digital Survey village 01-Jan- 10-Jan- 10-01- 25-Jan- 281 Services/ P 0.80 NCB N/A 10-JAN-2009 N/A N/A N/A N/A N/A Bhangchari 2009 2009 2009 2009 Mkt/24 M/s Futura Design & PRWSS/ 16-JAN- Consulta Digital Survey village 01-Jan- 10-Jan- 31-Jan- 282 Services/ A 0.80 NS N/A 16-JAN-2009 N/A 2009/0.80/ nts Pvt. 0.80 Bhangchari 2009 2009 2009 Mkt/24 INR Ltd. Ludhiana /0/ Indian PRWSS/ Digital Survey village 01-Sep- 23-Sep- 23-09- 14-Jun- 283 Services/ P 0.80 NCB N/A 23-SEP-2009 N/A N/A N/A N/A N/A Kabarwala 2009 2009 2009 2010 Mkt/25 Vision PRWSS/ 23-SEP- Lab Digital Survey village 21-Feb- 23-Sep- 14-Jun- 284 Services/ A 0.80 NS N/A 23-SEP-2009 N/A 2009/0.64/ 1432 Hyderaba 0.80 Kabarwala 2009 2009 2010 Mkt/25 INR d/0/ Indian PRWSS/ Soil Bearing 16-Jan- 20-Jan- 20-01- 29-Jan- 285 Services/ P Capacity Village 0.09 NCB N/A 20-JAN-2010 N/A N/A N/A N/A N/A 2010 2010 2010 2010 Mkt/26 Bhullarian AKSS PRWSS/ Soil Bearing 20-JAN- 16-Jan- 20-Jan- Consulta 29-Jan- 286 Services/ A Capacity Village 0.09 NS N/A 20-JAN-2010 N/A 2010/0.09/ 47 0.09 2010 2010 nts & 2010 Mkt/26 Bhullarian INR Engineer Page 36 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 s Bathinda /0/ Indian PRWSS/ Soil Bearing 01-Jan- 04-Jan- 04-01- 14-Jan- 287 Services/ P Capacity Village 0.18 NCB N/A 04-JAN-2010 N/A N/A N/A N/A N/A 2010 2010 2010 2010 Mkt/27 Singhe Wala AKSS Consulta nts & PRWSS/ Soil Bearing 04-JAN- 01-Jan- 04-Jan- Engineer 14-Jan- 288 Services/ A Capacity Village 0.18 NS N/A 04-JAN-2010 N/A 2010/0.18/ 43 0.18 2010 2010 s 2010 Mkt/27 Singhe Wala INR Bathinda /0/ Indian PRWSS/ Soil Bearing 01-Jan- 04-Jan- 04-01- 06-Jan- 289 Services/ P Capacity Village 0.18 NCB N/A 04-JAN-2010 N/A N/A N/A N/A N/A 2010 2010 2010 2010 Mkt/28 Enna Khera AKSS Consulta nts & PRWSS/ Soil Bearing 04-JAN- 01-Jan- 04-Jan- Engineer 06-Jan- 290 Services/ A Capacity Village 0.18 NS N/A 04-JAN-2010 N/A 2010/0.18/ 43 0.18 2010 2010 s 2010 Mkt/28 Enna Khera INR Bathinda /0/ Indian Soil Bearing PRWSS/ Capacity Village 11-Dec- 18-Dec- 18-12- 29-Dec- 291 Services/ P 0.18 NCB N/A 18-DEC-2009 N/A N/A N/A N/A N/A Dabwali 2009 2009 2009 2009 Mkt/29 Rahurianwali AKSS Consulta Soil Bearing nts & PRWSS/ 18-DEC- Capacity Village 11-Dec- 18-Dec- Engineer 19-Dec- 292 Services/ A 0.18 NS N/A 18-DEC-2009 N/A 2009/0.18/ 37 0.18 Dabwali 2009 2009 s 2010 Mkt/29 INR Rahurianwali Bathinda /0/ Indian Page 37 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ 17-Nov- 25-Nov- 25-11- 05-Dec- 293 Services/ P Wall Writing 0.25 NCB N/A 25-NOV-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2009 Mkt/3 Vision PRWSS/ 25-NOV- Lab 17-Nov- 25-Nov- 05-Dec- 294 Services/ A Wall Writing 0.25 NS N/A 25-NOV-2009 N/A 2009/0.25/ 506 Hyderaba 0.25 2009 2009 2009 Mkt/3 INR d/0/ Indian PRWSS/ Soil Bearing 11-Dec- 18-Dec- 18-12- 29-Jan- 295 Services/ P Capacity Village 0.09 NCB N/A 18-DEC-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2010 Mkt/30 Dhoula / Kingra AKSS Consulta nts & PRWSS/ Soil Bearing 18-DEC- 11-Dec- 18-Dec- Engineer 29-Jan- 296 Services/ A Capacity Village 0.09 NS N/A 18-DEC-2009 N/A 2009/0.09/ 37 0.09 2009 2009 s 2010 Mkt/30 Dhoula / Kingra INR Bathinda /0/ Indian PRWSS/ Soil Bearing 10-Oct- 21-Nov- 15-12- 25-Mar- 297 Services/ P Capacity Village 0.26 NCB N/A 15-DEC-2008 N/A N/A N/A N/A N/A 2008 2008 2008 2009 Mkt/31 Lakhewali AKSS Consulta nts & PRWSS/ Soil Bearing 15-DEC- 10-Oct- 21-Nov- Engineer 25-Mar- 298 Services/ A Capacity Village 0.26 NS N/A 15-DEC-2008 N/A 2008/0.07/ 17 0.26 2008 2008 s 2009 Mkt/31 Lakhewali INR Bathinda /0/ Indian PRWSS/ Soil Bearing 10-Nov- 21-Nov- 18-12- 25-Mar- 299 Services/ P Capacity Village 0.26 NCB N/A 18-DEC-2008 N/A N/A N/A N/A N/A 2008 2008 2008 2009 Mkt/32 Khane ki dhab AKSS PRWSS/ Soil Bearing 18-DEC- Consulta 10-Nov- 21-Nov- 25-Mar- 300 Services/ A Capacity Village 0.26 NS N/A 18-DEC-2008 N/A 2008/0.00/ 18 nts & 0.26 2008 2008 2009 Mkt/32 Khane ki dhab INR Engineer s Page 38 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Bathinda /0/ Indian PRWSS/ Soil Bearing 14-Jan- 04-Feb- 08-02- 17-Jun- 301 Services/ P Capacity Village 0.25 NCB N/A 08-FEB-2010 N/A N/A N/A N/A N/A 2010 2010 2010 2010 Mkt/33 Madhar Kalan AKSS Consulta nts & PRWSS/ Soil Bearing 08-FEB- 14-Jan- 04-Feb- Engineer 17-Jun- 302 Services/ A Capacity Village 0.25 NS N/A 08-FEB-2010 N/A 2010/0.15/ 23 0.25 2010 2010 s 2010 Mkt/33 Madhar Kalan INR Bathinda /0/ Indian PRWSS/ Soil Bearing 04-Jun- 23-Jun- 11-07- 17-Jul- 303 Services/ P Capacity Village 0.25 NCB N/A 11-JUL-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2009 Mkt/34 Urang AKSS Consulta nts & PRWSS/ Soil Bearing 11-JUL- 04-Jun- 23-Jun- Engineer 17-Jul- 304 Services/ A Capacity Village 0.25 NS N/A 11-JUL-2009 N/A 2009/0.25/ 23 0.25 2009 2009 s 2010 Mkt/34 Urang INR Bathinda /0/ Indian PRWSS/ Soil Bearing 08-Jun- 10-Jun- 10-06- 17-Dec- 305 Services/ P Capacity Village Lal 0.18 NCB N/A 10-JUN-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2009 Mkt/35 Bai AKSS Consulta nts & PRWSS/ Soil Bearing 10-JUN- 08-Jun- 10-Jun- Engineer 17-Dec- 306 Services/ A Capacity Village Lal 0.18 NS N/A 10-JUN-2009 N/A 2009/0.18/ 12 0.18 2009 2009 s 2009 Mkt/35 Bai INR Bathinda /0/ Indian Page 39 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Soil Bearing 08-Jun- 10-Jun- 10-06- 20-Jun- 307 Services/ P Capacity Village 0.18 NCB N/A 10-JUN-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2009 Mkt/36 Mithri Budhger AKSS Consulta nts & PRWSS/ Soil Bearing 10-JUN- 08-Jun- 10-Jun- Engineer 20-Jun- 308 Services/ A Capacity Village 0.18 NS N/A 10-JUN-2009 N/A 2009/0.18/ 15 0.18 2009 2009 s 2009 Mkt/36 Mithri Budhger INR Bathinda /0/ Indian PRWSS/ Soil Bearing 08-Jun- 10-Jun- 10-06- 20-Jun- 309 Services/ P Capacity Village 0.09 NCB N/A 10-JUN-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2009 Mkt/37 Daula AKSS Consulta nts & PRWSS/ Soil Bearing 10-JUN- 08-Jun- 10-Jun- Engineer 20-Jun- 310 Services/ A Capacity Village 0.09 NS N/A 10-JUN-2009 N/A 2009/0.10/ 12 0.09 2009 2009 s 2009 Mkt/37 Daula INR Bathinda /0/ Indian PRWSS/ Soil Bearing 08-Jun- 10-Jun- 08-02- 20-Jun- 311 Services/ P Capacity Village 0.18 NCB N/A 08-FEB-2010 N/A N/A N/A N/A N/A 2009 2009 2010 2009 Mkt/38 Banwala Anu AKSS Consulta nts & PRWSS/ Soil Bearing 08-FEB- 08-Jun- 10-Jun- Engineer 20-Jun- 312 Services/ A Capacity Village 0.18 NS N/A 08-FEB-2010 N/A 2010/0.18/ 16 0.18 2009 2009 s 2010 Mkt/38 Banwala Anu INR Bathinda /0/ Indian PRWSS/ Soil Bearing 25-Apr- 29-Apr- 29-04- 20-Jun- 313 Services/ P Capacity Village 0.18 NCB N/A 29-APR-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2009 Mkt/39 Ghumair khera Page 40 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 AKSS Consulta nts & PRWSS/ Soil Bearing 29-APR- 25-Apr- 29-Apr- Engineer 20-Jun- 314 Services/ A Capacity Village 0.18 NS N/A 29-APR-2009 N/A 2009/0.18/ 36 0.18 2009 2009 s 2009 Mkt/39 Ghumair khera INR Bathinda /0/ Indian PRWSS/ Soil Bearing 13-Apr- 17-Apr- 17-04- 20-Jun- 315 Services/ P Capacity Village Abul 0.18 NCB N/A 17-APR-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2009 Mkt/40 Khurana AKSS Consulta nts & PRWSS/ Soil Bearing 17-APR- 13-Apr- 17-Apr- Engineer 20-Jun- 316 Services/ A Capacity Village Abul 0.18 NS N/A 17-APR-2009 N/A 2009/0.18/ 42 0.18 2009 2009 s 2009 Mkt/40 Khurana INR Bathinda /0/ Indian PRWSS/ Soil Bearing 06-Mar- 10-Mar- 10-03- 20-Jun- 317 Services/ P Capacity Village 0.18 NCB N/A 10-MAR-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2009 Mkt/41 Badal AKSS Consulta nts & PRWSS/ Soil Bearing 10-MAR- 06-Mar- 10-Mar- Engineer 20-Jun- 318 Services/ A Capacity Village 0.18 NS N/A 10-MAR-2009 N/A 2009/0.18/ 113 0.18 2009 2009 s 2009 Mkt/41 Badal INR Bathinda /0/ Indian PRWSS/ 15-Jul- 23-Jul- 23-07- 05-Aug- 319 Services/ P Wall Writing 0.50 NCB N/A 23-JUL-2010 N/A N/A N/A N/A N/A 2010 2010 2010 2010 Mkt/42 Vision PRWSS/ 23-JUL- Lab 15-Jul- 23-Jul- 05-Aug- 320 Services/ A Wall Writing 0.50 NS N/A 23-JUL-2010 N/A 2010/0.47/ 1074 Hyderaba 0.47 2010 2010 2010 Mkt/42 INR d/0/ Indian Page 41 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ 26-Nov- 06-Dec- 06-12- 13-Dec- 321 Services/ P Wall Writing 0.25 NCB N/A 06-DEC-2010 N/A N/A N/A N/A N/A 2010 2010 2010 2010 Mkt/43 Vision PRWSS/ 06-DEC- Lab 26-Nov- 06-Dec- 13-Dec- 322 Services/ A Wall Writing 0.25 NS N/A 06-DEC-2010 N/A 2010/0.24/ 1569 Hyderaba 0.24 2010 2010 2010 Mkt/43 INR d/0/ Indian PRWSS/ 03-Jan- 18-Jan- 28-02- 31-Mar- 323 Services/ P Street Play 0.40 NCB N/A 28-FEB-2011 N/A N/A N/A N/A N/A 2011 2011 2011 2011 Mkt/44 PRWSS/ 28-FEB- Noor Art 03-Jan- 18-Jan- 31-Mar- 324 Services/ A Street Play 0.40 NS N/A 28-FEB-2011 N/A 2011/0.37/ 308 Group / 0 0.37 2011 2011 2011 Mkt/44 INR / Indian PRWSS/ 16-Nov- 23-Nov- 23-11- 22-Jan- 325 Services/ P Street Play 0.35 NCB N/A 23-NOV-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2010 Mkt/5 Bathinda PRWSS/ 23-NOV- 16-Nov- 23-Nov- Art 22-Jan- 326 Services/ A Street Play 0.35 NS N/A 23-NOV-2009 N/A 2009/0.35/ 504 0.35 2009 2009 Theatre / 2010 Mkt/5 INR 0 / Indian PRWSS/ Digital Survey village 08-Jun- 18-Jun- 10-06- 25-Aug- 327 Services/ P 0.51 NCB N/A 10-JUN-2009 N/A N/A N/A N/A N/A Mithri Budhger 2009 2009 2009 2009 Mkt/6 AKSS Consulta nts & PRWSS/ 10-JUN- Digital Survey village 08-Jun- 18-Jun- Engineer 25-Aug- 328 Services/ A 0.51 NS N/A 10-JUN-2009 N/A 2009/0.51/ 26 0.51 Mithri Budhger 2009 2009 s 2009 Mkt/6 INR Bathinda /0/ Indian PRWSS/ Digital Survey village 29-Jun- 06-Jul- 06-07- 24-Aug- 329 Services/ P 1.06 NCB N/A 06-JUL-2009 N/A N/A N/A N/A N/A Lal Bai 2009 2009 2009 2009 Mkt/7 Page 42 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 AKSS Consulta nts & PRWSS/ 06-JUL- Digital Survey village 29-Jun- 06-Jul- Engineer 24-Aug- 330 Services/ A 1.06 NS N/A 06-JUL-2009 N/A 2009/1.06/ 33 1.06 Lal Bai 2009 2009 s 2009 Mkt/7 INR Bathinda /0/ Indian PRWSS/ Digital Survey village 19-May- 27-May- 27-05- 24-Jun- 331 Services/ P Jandwala Charat 1.12 NCB N/A 27-MAY-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2009 Mkt/8 Singh AKSS Consulta nts & PRWSS/ Digital Survey village 27-MAY- 19-May- 27-May- Engineer 24-Mar- 332 Services/ A Jandwala Charat 1.12 NS N/A 27-MAY-2009 N/A 2009/1.12/ 31 1.12 2009 2009 s 2009 Mkt/8 Singh INR Bathinda /0/ Indian PRWSS/ Digital Survey village 19-May- 27-May- 27-05- 25-Aug- 333 Services/ P Bodi Wala Kharak 1.08 NCB N/A 27-MAY-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2009 Mkt/9 Singh AKSS Consulta nts & PRWSS/ Digital Survey village 27-MAY- 19-May- 27-May- Engineer 25-Aug- 334 Services/ A Bodi Wala Kharak 1.08 NS N/A 27-MAY-2009 N/A 2009/1.08/ 31 1.08 2009 2009 s 2009 Mkt/9 Singh INR Bathinda /0/ Indian Zone: Central Zone, Circle: Ferozpur Circle, District: Ferozepur PRWSS/ Digital Survey of W/S 01-Dec- 18-Dec- 18-12- 18-Jan- 335 Services/ P Scheme Vill. Packa 0.70 NCB N/A 18-DEC-2008 N/A N/A N/A N/A N/A 2008 2008 2008 2009 Frz/10 Chishti Dhan PRWSS/ Digital Survey of W/S 18-DEC- Dhan 01-Dec- 18-Dec- 18-Jan- 336 Services/ A Scheme Vill. Packa 0.70 NS N/A 18-DEC-2008 N/A 2008/0.68/ 1 Baba 0.68 2008 2008 2009 Frz/10 Chishti INR Wariyam Singh, Page 43 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Welfare Society, Pandher Kalan, Distt. Amritsar / 0 / Indian PRWSS/ Digital Survey of W/S 01-Dec- 18-Dec- 18-12- 18-Jan- 337 Services/ P Scheme Vill. Lalo 0.30 NCB N/A 18-DEC-2008 N/A N/A N/A N/A N/A 2008 2008 2008 2009 Frz/11 Wali Dhan Dhan Baba Wariyam Singh, PRWSS/ Digital Survey of W/S 18-DEC- 01-Dec- 18-Dec- Welfare 18-Jan- 338 Services/ A Scheme Vill. Lalo 0.30 NS N/A 18-DEC-2008 N/A 2008/0.24/ 1 0.24 2008 2008 Society, 2009 Frz/11 Wali INR Pandher Kalan, Distt. Amritsar / 0 / Indian PRWSS/ Digital Survey of W/S 01-Dec- 18-Dec- 18-12- 18-Jan- 339 Services/ P Scheme Vill. 1.00 NCB N/A 18-DEC-2008 N/A N/A N/A N/A N/A 2008 2008 2008 2009 Frz/12 Kathgarh Dhan Dhan Baba Wariyam Singh, PRWSS/ Digital Survey of W/S 18-DEC- 01-Dec- 18-Dec- Welfare 18-Jan- 340 Services/ A Scheme Vill. 1.00 NS N/A 18-DEC-2008 N/A 2008/0.96/ 1 0.96 2008 2008 Society, 2009 Frz/12 Kathgarh INR Pandher Kalan, Distt. Amritsar / 0 / Indian PRWSS/ Digital Survey of W/S 11-Feb- 20-Feb- 20-02- 20-Mar- 341 Services/ P Schene Jalla Lakhe 0.35 NCB N/A 20-FEB-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2009 Frz/13 Ke Hithar Page 44 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Dhan Dhan Baba Wariyam Singh, PRWSS/ Digital Survey of W/S 20-FEB- 11-Feb- 20-Feb- Welfare 20-Mar- 342 Services/ A Schene Jalla Lakhe 0.35 NS N/A 20-FEB-2009 N/A 2009/0.29/ 1 0.29 2009 2009 Society, 2009 Frz/13 Ke Hithar INR Pandher Kalan, Distt. Amritsar / 0 / Indian PRWSS/ Digital Survey of W/S 11-Feb- 20-Feb- 20-02- 20-Mar- 343 Services/ P 0.45 NCB N/A 20-FEB-2009 N/A N/A N/A N/A N/A Schene Behak Khas 2009 2009 2009 2009 Frz/14 Dhan Dhan Baba Wariyam Singh, PRWSS/ 20-FEB- Digital Survey of W/S 11-Feb- 20-Feb- Welfare 20-Mar- 344 Services/ A 0.45 NS N/A 20-FEB-2009 N/A 2009/0.44/ 1 0.44 Schene Behak Khas 2009 2009 Society, 2009 Frz/14 INR Pandher Kalan, Distt. Amritsar / 0 / Indian PRWSS/ Digital Survey of W/S 11-Feb- 20-Feb- 20-02- 20-Mar- 345 Services/ P 1.50 NCB N/A 20-FEB-2009 N/A N/A N/A N/A N/A Schene Katehra 2009 2009 2009 2009 Frz/15 Dhan Dhan Baba Wariyam Singh, PRWSS/ 20-FEB- Digital Survey of W/S 11-Feb- 20-Feb- Welfare 20-Mar- 346 Services/ A 1.50 NS N/A 20-FEB-2009 N/A 2009/1.44/ 1 1.44 Schene Katehra 2009 2009 Society, 2009 Frz/15 INR Pandher Kalan, Distt. Amritsar / 0 / Indian Page 45 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey of W/S 11-Feb- 20-Feb- 20-02- 20-Mar- 347 Services/ P Scheme Lakhe Wali 1.20 NCB N/A 20-FEB-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2009 Frz/16 & Kheo Wali Dhan Dhan Baba Wariyam Singh, PRWSS/ Digital Survey of W/S 20-FEB- 11-Feb- 20-Feb- Welfare 20-Mar- 348 Services/ A Scheme Lakhe Wali 1.20 NS N/A 20-FEB-2009 N/A 2009/1.16/ 1 1.16 2009 2009 Society, 2009 Frz/16 & Kheo Wali INR Pandher Kalan, Distt. Amritsar / 0 / Indian PRWSS/ Digital Survey of W/S 07-Jan- 19-Feb- 19-02- 26-Mar- 349 Services/ P 0.50 NCB N/A 19-FEB-2008 N/A N/A N/A N/A N/A Scheme Toot 2008 2008 2008 2008 Frz/17 Kulwinder PRWSS/ 19-FEB- Contracto Digital Survey of W/S 07-Jan- 19-Feb- 26-Mar- 350 Services/ A 0.50 NS N/A 19-FEB-2008 N/A 2008/0.35/ 1 r Ambala 0.35 Scheme Toot 2008 2008 2008 Frz/17 INR Cantt. / 0 / Indian PRWSS/ Digital Survey of W/S 29-Jan- 04-Feb- 04-02- 04-Mar- 351 Services/ P 0.50 NCB N/A 04-FEB-2009 N/A N/A N/A N/A N/A Scheme Ratul Rohi 2009 2009 2009 2009 Frz/18 Shivam Engineer s PRWSS/ 04-FEB- Digital Survey of W/S 29-Jan- 04-Feb- Associate 04-Mar- 352 Services/ A 0.50 NS N/A 04-FEB-2009 N/A 2009/0.44/ 1 0.44 Scheme Ratul Rohi 2009 2009 s 2009 Frz/18 INR Panchkul a/0/ Indian PRWSS/ Digital Survey of W/S 29-Jan- 04-Feb- 04-02- 04-Mar- 353 Services/ P 0.90 NCB N/A 04-FEB-2009 N/A N/A N/A N/A N/A Scheme Ghall Khurd 2009 2009 2009 2009 Frz/19 Page 46 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Shivam Engineer s PRWSS/ 04-FEB- Digital Survey of W/S 29-Jan- 04-Feb- Associate 04-Mar- 354 Services/ A 0.90 NS N/A 04-FEB-2009 N/A 2009/0.83/ 1 0.83 Scheme Ghall Khurd 2009 2009 s 2009 Frz/19 INR Panchkul a/0/ Indian PRWSS/ Digital Survey of W/S 29-Jan- 04-Feb- 04-02- 04-Mar- 355 Services/ P 0.90 NCB N/A 04-FEB-2009 N/A N/A N/A N/A N/A Scheme Shakoor 2009 2009 2009 2009 Frz/20 AKSS Consulta nts & PRWSS/ 04-FEB- Digital Survey of W/S 29-Jan- 04-Feb- Engineer 04-Mar- 356 Services/ A 0.90 NS N/A 04-FEB-2009 N/A 2009/0.81/ 1 0.81 Scheme Shakoor 2009 2009 s 2009 Frz/20 INR Bathinda /0/ Indian PRWSS/ Digital Survey of W/S 29-Jan- 04-Feb- 04-02- 04-Mar- 357 Services/ P Scheme Sudh Singh 0.55 NCB N/A 04-FEB-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2009 Frz/21 Wala Shivam Engineer s PRWSS/ Digital Survey of W/S 04-FEB- 29-Jan- 04-Feb- Associate 04-Mar- 358 Services/ A Scheme Sudh Singh 0.55 NS N/A 04-FEB-2009 N/A 2009/0.52/ 1 0.52 2009 2009 s 2009 Frz/21 Wala INR Panchkul a/0/ Indian PRWSS/ Digital Survey of W/S 29-Jan- 04-Feb- 04-02- 04-Mar- 359 Services/ P 0.30 NCB N/A 04-FEB-2009 N/A N/A N/A N/A N/A Scheme Malle Wala 2009 2009 2009 2009 Frz/22 Shivam Engineer PRWSS/ 04-FEB- s Digital Survey of W/S 29-Jan- 04-Feb- 04-Mar- 360 Services/ A 0.30 NS N/A 04-FEB-2009 N/A 2009/0.23/ 1 Associate 0.23 Scheme Malle Wala 2009 2009 2009 Frz/22 INR s Panchkul a/0/ Page 47 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Indian PRWSS/ Digital Survey of W/S 29-Jan- 04-Feb- 04-02- 04-Mar- 361 Services/ P 0.80 NCB N/A 04-FEB-2009 N/A N/A N/A N/A N/A Scheme Shehzadi 2009 2009 2009 2009 Frz/23 Shivam Engineer s PRWSS/ 04-FEB- Digital Survey of W/S 29-Jan- 04-Feb- Associate 04-Mar- 362 Services/ A 0.80 NS N/A 04-FEB-2009 N/A 2009/0.70/ 1 0.07 Scheme Shehzadi 2009 2009 s 2009 Frz/23 INR Panchkul a/0/ Indian PRWSS/ Digital Survey of W/S 16-Feb- 15-Mar- 15-03- 25-Mar- 363 Services/ P Scheme Talwandi 0.50 NCB N/A 15-MAR-2010 N/A N/A N/A N/A N/A 2010 2010 2010 2010 Frz/24 Mange Khan Kulwinder PRWSS/ Digital Survey of W/S 15-MAR- Contracto 16-Feb- 15-Mar- 25-Mar- 364 Services/ A Scheme Talwandi 0.50 NS N/A 15-MAR-2010 N/A 2010/0.48/ 1 r Ambala 0.48 2010 2010 2010 Frz/24 Mange Khan INR Cantt. / 0 / Indian PRWSS/ Digital Survey of W/S 15-May- 22-May- 22-05- 22-Jun- 365 Services/ P 0.70 ICB N/A 22-MAY-2010 N/A N/A N/A N/A N/A Scheme,Longo Deva 2010 2010 2010 2010 Frz/25 S.T PRWSS/ 22-MAY- Digital Survey of W/S 15-May- 22-May- Associate 11-Jul- 366 Services/ A 0.70 NS N/A 22-MAY-2010 N/A 2010/0.00/ 0.35 Scheme,Longo Deva 2010 2010 s/0/ 2011 Frz/25 INR Indian PRWSS/ Digital Survey of W/S 15-May- 12-May- 22-05- 22-Jun- 367 Services/ P Scheme,Bandala 0.50 ICB N/A 22-MAY-2010 N/A N/A N/A N/A N/A 2010 2010 2010 2010 Frz/26 Purana M/S PRWSS/ Digital Survey of W/S 22-MAY- 15-May- 12-May- Friends 368 Services/ A Scheme,Bandala 0.50 NS N/A 22-MAY-2010 N/A 2010/0.05/ 6.38 2010 2010 constructi Frz/26 Purana INR on Co. / 0 Page 48 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 / Indian PRWSS/ Digital Survey of W/S 15-Apr- 22-Apr- 22-04- 22-May- 369 Services/ P 0.70 ICB N/A 22-APR-2010 N/A N/A N/A N/A N/A Scheme,Mehma 2010 2010 2010 2010 Frz/27 S.T PRWSS/ 22-APR- Digital Survey of W/S 15-Apr- 22-Apr- Associate 11-Jul- 370 Services/ A 0.70 NS N/A 22-APR-2010 N/A 2010/0.00/ 0.35 Scheme,Mehma 2010 2010 s/0/ 2011 Frz/27 INR Indian PRWSS/ Digital Survey of W/S 15-Aug- 25-Aug- 25-08- 25-Sep- 371 Services/ P Scheme,Jhanda 0.50 ICB N/A 25-AUG-2010 N/A N/A N/A N/A N/A 2010 2010 2010 2010 Frz/28 Bagga Nawan S.T PRWSS/ Digital Survey of W/S 25-AUG- 15-Aug- 25-Aug- Associate 11-Jul- 372 Services/ A Scheme,Jhanda 0.50 NS N/A 25-AUG-2010 N/A 2010/0.00/ 0.35 2010 2010 s/0/ 2011 Frz/28 Bagga Nawan INR Indian PRWSS/ Digital Survey of W/S 15-Aug- 25-Aug- 25-08- 25-Sep- 373 Services/ P 0.50 ICB N/A 25-AUG-2010 N/A N/A N/A N/A N/A Scheme,Khanna 2010 2010 2010 2010 Frz/29 S.T PRWSS/ 25-AUG- Digital Survey of W/S 15-Aug- 25-Aug- Associate 11-Jul- 374 Services/ A 0.50 NS N/A 25-AUG-2010 N/A 2010/0.00/ 0.35 Scheme,Khanna 2010 2010 s/0/ 2011 Frz/29 INR Indian PRWSS/ 03-Nov- 04-Dec- 04-12- 20-Jun- 375 Services/ P A.C of 1.5 Tonn 4.65 NCB N/A 04-DEC-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2010 Frz/3 PRWSS/ 05-Jun- 15-Jun- 376 Services/ A A.C of 1.5 Tonn 0.30 NS N/A N/A 2010 2010 Frz/3 Page 49 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey of W/S 05-Aug- 25-Aug- 25-08- 25-Sep- 377 Services/ P 0.60 ICB N/A 25-AUG-2010 N/A N/A N/A N/A N/A Scheme,Valtoha 2010 2010 2010 2010 Frz/30 PRWSS/ Digital Survey of W/S 05-Aug- 25-Aug- 378 Services/ A 0.60 NS N/A N/A Scheme,Valtoha 2010 2010 Frz/30 PRWSS/ Digital Survey of W/S 15-Apr- 22-Apr- 22-04- 22-May- 379 Services/ P 1.50 ICB N/A 22-APR-2010 N/A N/A N/A N/A N/A Scheme,Bazidpur 2010 2010 2010 2010 Frz/31 PRWSS/ Digital Survey of W/S 15-Apr- 22-Apr- 380 Services/ A 1.50 NS N/A N/A Scheme,Bazidpur 2010 2010 Frz/31 PRWSS/ Digital Survey of W/S 15-Aug- 25-Aug- 25-08- 25-Sep- 381 Services/ P Scheme,Loh Ke 0.60 ICB N/A 25-AUG-2010 N/A N/A N/A N/A N/A 2010 2010 2010 2010 Frz/32 Khurd PRWSS/ Digital Survey of W/S 15-Aug- 25-Aug- 382 Services/ A Scheme,Loh Ke 0.60 NS N/A N/A 2010 2010 Frz/32 Khurd PRWSS/ Digital Survey of W/S 15-May- 12-May- 22-05- 22-Jun- 383 Services/ P Scheme,Mohkam 0.60 ICB N/A 22-MAY-2010 N/A N/A N/A N/A N/A 2010 2010 2010 2010 Frz/33 Khan Wala PRWSS/ Digital Survey of W/S 15-May- 12-May- 384 Services/ A Scheme,Mohkam 0.60 NS N/A N/A 2010 2010 Frz/33 Khan Wala PRWSS/ Digital Survey of W/S 12-Apr- 22-Apr- 27-04- 27-May- 385 Services/ P Scheme,Churi Wala 1.00 ICB N/A 27-APR-2011 N/A N/A N/A N/A N/A 2011 2011 2011 2011 Frz/34 Dhanna Page 50 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey of W/S 12-Apr- 22-Apr- 386 Services/ A Scheme,Churi Wala 0.10 NS N/A N/A 2011 2011 Frz/34 Dhanna PRWSS/ Digital Survey of W/S 12-Apr- 22-Apr- 27-04- 27-May- 387 Services/ P 1.50 ICB N/A 27-APR-2011 N/A N/A N/A N/A N/A Scheme,Nihal Khera 2011 2011 2011 2011 Frz/35 PRWSS/ Digital Survey of W/S 12-Apr- 22-Apr- 388 Services/ A 1.50 NS N/A N/A Scheme,Nihal Khera 2011 2011 Frz/35 PRWSS/ Digital Survey of W/S 12-Apr- 22-Apr- 27-04- 27-May- 389 Services/ P Scheme,Mammu 0.90 ICB N/A 27-APR-2011 N/A N/A N/A N/A N/A 2011 2011 2011 2011 Frz/36 Khera PRWSS/ Digital Survey of W/S 12-Apr- 22-Apr- 390 Services/ A Scheme,Mammu 0.90 NS N/A N/A 2011 2011 Frz/36 Khera PRWSS/ Digital Survey of W/S 12-Apr- 22-Apr- 27-04- 27-May- 391 Services/ P Scheme,Murad Wala 0.80 ICB N/A 27-APR-2011 N/A N/A N/A N/A N/A 2011 2011 2011 2011 Frz/37 Dal Singh PRWSS/ Digital Survey of W/S 12-Apr- 22-Apr- 392 Services/ A Scheme,Murad Wala 0.80 NS N/A N/A 2011 2011 Frz/37 Dal Singh PRWSS/ 10-Jul- 20-Jul- 20-Aug- 393 Services/ P 10 Nos. Street Play 0.50 ICB N/A N/A N/A N/A N/A N/A 2010 2010 2010 Frz/38 PRWSS/ 10-Jul- 20-Jul- 394 Services/ A 10 Nos. Street Play 0.50 NS N/A N/A 2010 2010 Frz/38 Page 51 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ 10-Aug- 20-Aug- 10-Sep- 395 Services/ P Puppet Show 0.20 ICB N/A N/A N/A N/A N/A N/A 2010 2010 2010 Frz/39 PRWSS/ 10-Aug- 20-Aug- 396 Services/ A Puppet Show 0.20 NS N/A N/A 2010 2010 Frz/39 PRWSS/ 13-Nov- 14-Dec- 14-12- 16-Mar- 397 Services/ P Wall Writing 2.95 NCB N/A 14-DEC-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2011 Frz/4 PRWSS/ 28-FEB- Smile 22-Feb- 28-Feb- 16-Mar- 398 Services/ A Wall Writing 0.71 NS N/A 28-FEB-2011 N/A 2011/0.70/ 174 Arts / 0 / 0.07 2011 2011 2011 Frz/4 INR Indian Wall Writing i)Block- Zira,Vill.-Talwandi Mange Khan ii)Block-Makhu, Vill.- PRWSS/ Jhanda Bhugga 02-Feb- 02-Feb- 03-02- 12-Feb- 399 Services/ P Nawan iii)Block- 0.20 NCB N/A 03-FEB-2010 N/A N/A N/A N/A N/A 2010 2010 2010 2010 Frz/6 Makhu ,Vill.-Khanna Kalan iv)Block-Ghall Khurd,Vill.-Bazidpur v)Block-Ghall Khurd, Vill.-Achhewala. Wall Writing i)Block- Zira,Vill.-Talwandi Mange Khan ii)Block-Makhu, Vill.- EE PRWSS/ Jhanda Bhugga 03-FEB- Smile 02-Feb- 02-Feb- DPMC 12-Feb- 400 Services/ A Nawan iii)Block- 0.20 NS N/A 03-FEB-2010 N/A 2010/0.20/ Arts / 0 / 0.02 2010 2010 FZR 2010 Frz/6 Makhu ,Vill.-Khanna INR Indian No.410 Kalan iv)Block-Ghall Khurd,Vill.-Bazidpur v)Block-Ghall Khurd, Vill.-Achhewala. Wall Writing i)Block- PRWSS/ Ghall Khurd,Vill.- 03-Feb- 10-Feb- 10-02- 20-Feb- 401 Services/ P 0.20 NCB N/A 10-FEB-2010 N/A N/A N/A N/A N/A Bhanger ii)Block- 2010 2010 2010 2010 Frz/7 Ghall Khurd, Vill.- Page 52 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Faride Wala iii)Block- Ghall Khurd,Vill.- Sudh Singh wala iv) Block-Ghall Khurd, Vill.-Toot v) Block- Ghall Khurd,Vill- Shakoor Wall Writing i)Block- Ghall Khurd,Vill.- Bhanger ii)Block- Ghall Khurd, Vill.- EE PRWSS/ Faride Wala iii)Block- 10-FEB- Smile 03-Feb- 10-Feb- DPMC 20-Feb- 402 Services/ A Ghall Khurd,Vill.- 0.20 NS N/A 10-FEB-2010 N/A 2010/0.20/ Arts / 0 / 0.02 2010 2010 FZR 2010 Frz/7 Sudh Singh wala iv) INR Indian No.413 Block-Ghall Khurd, Vill.-Toot v) Block- Ghall Khurd,Vill- Shakoor Wall Writing i)Block- Ghall Khurd, Vill.- Hasti Wala ii)Block- Zira, Vill.-Malsian PRWSS/ iii)Block-Makhu,Vill.- 18-Feb- 19-Feb- 19-02- 01-Mar- 403 Services/ P 0.20 NCB N/A 19-FEB-2010 N/A N/A N/A N/A N/A Behak Paccharian 2010 2010 2010 2010 Frz/8 iv)Block-Ghall Khurd, Vill.- Kalash v)Block- Ghall Khurd, Vill.- Ghall Khurd Wall Writing i)Block- Ghall Khurd, Vill.- Hasti Wala ii)Block- Zira, Vill.-Malsian EE PRWSS/ 19-FEB- Smile iii)Block-Makhu,Vill.- 18-Feb- 19-Feb- DPMC 01-Mar- 404 Services/ A 0.20 NS N/A 19-FEB-2010 N/A 2010/0.20/ Arts / 0 / 0.02 Behak Paccharian 2010 2010 FZR 2010 Frz/8 INR Indian iv)Block-Ghall Khurd, No.416 Vill.- Kalash v)Block- Ghall Khurd, Vill.- Ghall Khurd Wall Writing i)Block- Zira,Vill.-Jaura PRWSS/ ii)Block-Zira,Vill.-Loh 24-Feb- 25-Feb- 25-02- 01-Mar- 405 Services/ P 0.20 NCB N/A 25-FEB-2010 N/A N/A N/A N/A N/A Ke Khurd iii)Block- 2010 2010 2010 2010 Frz/9 Zira,Vill.-Mansoor Wala Kalan iv)Block- Page 53 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Zira,Vill.-Suner v)Block-Zira, Vill.- Valtoha Wall Writing i)Block- Zira,Vill.-Jaura ii)Block-Zira,Vill.-Loh EE PRWSS/ Ke Khurd iii)Block- 25-FEB- Smile 24-Feb- 25-Feb- DPMC 01-Mar- 406 Services/ A Zira,Vill.-Mansoor 0.20 NS N/A 25-FEB-2010 N/A 2010/0.19/ Arts / 0 / 0.19 2010 2010 FZR 2010 Frz/9 Wala Kalan iv)Block- INR Indian No.419 Zira,Vill.-Suner v)Block-Zira, Vill.- Valtoha Zone: Central Zone, Circle: Ludhiana Circle, District: Ludhiana PRWSS To conduct digital P-LDH- 27-Sep- 12-Oct- 16-Nov- 12-02- 14-Feb- 407 P survey with total 280.00 NCB 30-09-2008 15-JAN-2009 30-09-2008 N/A N/A N/A N/A B1-S-17- 2008 2008 2008 2009 2009 sanitation Method I M/s.Visio n Lab PRWSS To conduct digital 19-OCT- Institute, P-LDH- 28-Oct- 12-Oct- 16-Nov- 408 A survey with total 60.00 NCB 25-11-2008 19-OCT-2009 04-09-2009 2009/41.9 12 (T Hyderaba 34/I B1-S-17- 2012 2008 2008 sanitation Method 9/ INR d/0/ I Indian Zone: North Zone, Circle: Amritsar Circle, District: Amritsar Wall Writing of SNK PRWSS- Toll free no. at 4 SHOPPI 27-Aug- 27-Aug- 06-Sep- 07-09- 08-Oct- 409 S-DIV08- P prominent places in 4.41 N/A 07-SEP-2012 N/A N/A N/A N/A N/A NG 2012 2012 2012 2012 2012 1941 each villages of Distt. Amritsar Zone: North Zone, Circle: Amritsar Circle, District: Tarntaran Wall Writing of SNK PRWSS- Toll free no. at 4 SHOPPI 30-Aug- 08-Sep- 08-09- 08-Oct- 410 S-DIV10- P prominent places in 3.00 N/A N/A N/A N/A N/A N/A NG 2012 2012 2012 2012 1939 each villages of Distt. Tarn Taran Page 54 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Golden Eagle Wall Writing of SNK Glow PRWSS- Toll free no. at 4 14-SEP- SHOPPI 14-Sep- 06-Sep- 14-Sep- Sign F.F 411 S-DIV10- A prominent places in 3.05 N/A 14-SEP-2012 N/A 2012/3.05/ 571 NG 2012 2012 2012 Hide 1939 each villages of Distt. INR Market Tarn Taran Amritsar / 0 / Indian PRWSS/ Digital Survey of 08-Feb- 16-Feb- 04-Sep- 412 Services/ P 0.68 NS N/A N/A N/A N/A N/A N/A Village Kasel 2009 2009 2009 Trtn/10 Dhan Dhan Baba Wariyam Singh, PRWSS/ 03-AUG- Digital Survey of 12-Aug- 08-Feb- 16-Feb- Welfare 04-Sep- 413 Services/ A 0.68 NS N/A 03-AUG-2009 N/A 2009/0.68/ 81 0.68 Village Kasel 2009 2009 2009 Society, 2009 Trtn/10 INR Pandher Kalan, Distt. Amritsar / 0 / Indian PRWSS/ Digital Survey of 02-Mar- 09-Mar- 04-Sep- 414 Services/ P 0.30 NS N/A N/A N/A N/A N/A N/A Village Chhihrewal 2009 2009 2009 Trtn/11 Sapetelite Mapping PRWSS/ 03-AUG- Consulta Digital Survey of 09-Mar- 02-Mar- 09-Mar- 04-Sep- 415 Services/ A 0.30 NS N/A 03-AUG-2009 N/A 2009/0.29/ 7 nt 0.29 Village Chhihrewal 2009 2009 2009 2009 Trtn/11 INR Chandiga rh / 0 / Indian PRWSS/ Digital Survey of 27-Feb- 07-Mar- 04-Sep- 416 Services/ P 0.47 NS N/A N/A N/A N/A N/A N/A Village Gajjal 2009 2009 2009 Trtn/12 Page 55 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Sapetelite Mapping PRWSS/ 03-AUG- Consulta Digital Survey of 03-Aug- 27-Feb- 07-Mar- 417 Services/ A 0.47 NS N/A 03-AUG-2009 N/A 2009/0.46/ 1 nt 0.00 Village Gajjal 2009 2009 2009 Trtn/12 INR Chandiga rh / 0 / Indian PRWSS/ Digital Survey of 27-Feb- 07-Mar- 04-Sep- 418 Services/ P 1.60 NS N/A N/A N/A N/A N/A N/A Village Bhura Kona 2009 2009 2009 Trtn/13 M/S PRWSS/ 03-AUG- Digital Survey of 03-Aug- 27-Feb- 07-Mar- S.R.C 03-Aug- 419 Services/ A 1.60 NS N/A 03-AUG-2009 N/A 2009/1.57/ 1 1.60 Village Bhura Kona 2009 2009 2009 Infratec 2009 Trtn/13 INR Mathura / PRWSS/ Digital Survey of 27-Feb- 07-Mar- 04-Sep- 420 Services/ P 0.38 NS N/A N/A N/A N/A N/A N/A Village Dhul kona 2009 2009 2009 Trtn/14 Sapetelite Mapping PRWSS/ 03-AUG- Consulta Digital Survey of 18-Mar- 27-Feb- 07-Mar- 04-Sep- 421 Services/ A 0.38 NS N/A 03-AUG-2009 N/A 2009/0.38/ 1 nt 0.38 Village Dhul kona 2009 2009 2009 2009 Trtn/14 INR Chandiga rh / 0 / Indian PRWSS/ Digital Survey of 09-Sep- 15-Sep- 07-Jan- 422 Services/ P village Bhuchar 0.70 NS N/A N/A N/A N/A N/A N/A 2010 2010 2011 Trtn/15 Khurd M/S PRWSS/ Digital Survey of 07-DEC- 17-Aug- 09-Sep- 15-Sep- S.R.C 07-Jan- 423 Services/ A village Bhuchar 0.70 NS N/A 07-DEC-2010 N/A 2010/0.70/ 6 0.70 2010 2010 2010 Infratec 2011 Trtn/15 Khurd INR Mathura / PRWSS/ Digital Survey of 30-Nov- 09-Dec- 28-Mar- 424 Services/ P Village Talwandi 0.93 NS N/A N/A N/A N/A N/A N/A 2010 2010 2011 Trtn/16 Soba Singh Page 56 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 M/S PRWSS/ Digital Survey of 28-FEB- 19-Nov- 30-Nov- 09-Dec- S.R.C 28-Feb- 425 Services/ A Village Talwandi 0.93 NS N/A 28-FEB-2011 N/A 2011/0.93/ 6 0.93 2010 2010 2010 Infratec 2011 Trtn/16 Soba Singh INR Mathura / PRWSS/ Digital Survey of 09-Sep- 15-Sep- 426 Services/ P 1.06 NS N/A N/A N/A N/A N/A N/A Village Sheikh Chak 2010 2010 Trtn/17 Vision PRWSS/ 23-SEP- Lab Digital Survey of 27-Aug- 21-Feb- 23-Sep- 23-Sep- 427 Services/ A 0.80 NS N/A 23-SEP-2009 N/A 2009/0.64/ 1432 Hyderaba 0.80 Village Sheikh Chak 2010 2009 2009 2009 Trtn/17 INR d/0/ Indian PRWSS/ Digital Survey of 03-Feb- 14-Feb- 428 Services/ P 0.36 NS N/A N/A N/A N/A N/A N/A Village Surwind 2011 2011 Trtn/18 M/S PRWSS/ 28-FEB- Digital Survey of 19-Nov- 03-Feb- 14-Feb- S.R.C 28-Mar- 429 Services/ A 0.36 NS N/A 28-FEB-2011 N/A 2011/0.36/ 6 0.45 Village Surwind 2010 2011 2011 Infratec 2011 Trtn/18 INR Mathura / PRWSS/ Digital Survey of 05-Feb- 14-Feb- 430 Services/ P 0.45 NS N/A N/A N/A N/A N/A N/A Village Baserke 2011 2011 Trtn/19 M/S PRWSS/ 07-MAR- Digital Survey of 21-Feb- 05-Feb- 14-Feb- S.R.C 07-Apr- 431 Services/ A 0.45 NS N/A 07-MAR-2011 N/A 2011/0.45/ 6 0.45 Village Baserke 2011 2011 2011 Infratec 2011 Trtn/19 INR Mathura / PRWSS/ 13-Jan- 23-Dec- 30-Dec- 19-Feb- 432 Services/ P Wall Writing 2.24 NCB N/A N/A N/A N/A N/A N/A 2009 2009 2009 2010 Trtn/2 Golden Eagle Glow PRWSS/ 19-JAN- 13-Jan- 23-Dec- 30-Dec- Sign F.F 19-Feb- 433 Services/ A Wall Writing 0.22 NCB N/A 19-JAN-2009 N/A 2009/0.20/ 959 0.22 2009 2009 2009 Hide 2009 Trtn/2 INR Market Amritsar / 0 / Indian Page 57 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey of 03-Feb- 14-Feb- 434 Services/ P 0.28 NS N/A N/A N/A N/A N/A N/A Village Amin Shah 2011 2011 Trtn/20 M/S PRWSS/ 07-MAR- Digital Survey of 07-Feb- 03-Feb- 14-Feb- S.R.C 07-Apr- 435 Services/ A 0.28 NS N/A 07-MAR-2011 N/A 2011/0.28/ 6 0.28 Village Amin Shah 2011 2011 2011 Infratec 2011 Trtn/20 INR Mathura / PRWSS/ Digital Survey of 05-Dec- 15-Dec- 436 Services/ P 0.35 NS N/A N/A N/A N/A N/A N/A Village Raisiana 2010 2010 Trtn/21 M/S PRWSS/ 28-FEB- Digital Survey of 19-Nov- 05-Dec- 15-Dec- S.R.C 28-Mar- 437 Services/ A 0.35 NS N/A 28-FEB-2010 N/A 2010/0.35/ 6 0.35 Village Raisiana 2010 2010 2010 Infratec 2010 Trtn/21 INR Mathura / PRWSS/ Digital Survey of 06-Dec- 15-Dec- 438 Services/ P 1.32 NS N/A N/A N/A N/A N/A N/A Village Pakhoke 2010 2010 Trtn/22 M/S PRWSS/ 07-MAR- Digital Survey of 29-Dec- 06-Dec- 15-Dec- S.R.C 07-Apr- 439 Services/ A 1.32 NS N/A 07-MAR-2011 N/A 2011/1.32/ 6 1.32 Village Pakhoke 2010 2010 2010 Infratec 2011 Trtn/22 INR Mathura / PRWSS/ Digital Survey of 30-Dec- 12-Jan- 440 Services/ P 0.96 NS N/A N/A N/A N/A N/A N/A Village Mamanke 2010 2011 Trtn/23 M/S PRWSS/ 07-MAR- Digital Survey of 30-Dec- 12-Jan- S.R.C 07-Apr- 441 Services/ A 0.96 NS N/A 07-MAR-2011 N/A 2011/0.96/ 6 0.96 Village Mamanke 2010 2011 Infratec 2011 Trtn/23 INR Mathura / PRWSS/ 10-Aug- 24-Aug- 442 Services/ P Wall writing 1.60 NS N/A N/A N/A N/A N/A N/A 2010 2010 Trtn/24 Page 58 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 M/S PRWSS/ 27-AUG- B.G.S 27-Aug- 10-Aug- 24-Aug- 08-Oct- 443 Services/ A Wall writing 1.60 NS N/A 27-AUG-2010 N/A 2010/1.60/ 290 Adverties 1.60 2010 2010 2010 2010 Trtn/24 INR er / 0 / Indian PRWSS/ 31-Oct- 10-Nov- 05-Dec- 19-Feb- 444 Services/ P Wall Writing 0.39 NS N/A N/A N/A N/A N/A N/A 2008 2008 2008 2010 Trtn/5 Golden Eagle Glow PRWSS/ 10-DEC- 31-Oct- 10-Nov- 05-Dec- Sign F.F 19-Feb- 445 Services/ A Wall Writing 0.39 NS N/A 10-DEC-2008 N/A 2008/0.37/ 305 0.39 2008 2008 2008 Hide 2010 Trtn/5 INR Market Amritsar / 0 / Indian PRWSS/ Digital Survey of 25-Nov- 02-Dec- 04-Sep- 446 Services/ P 0.20 NS N/A N/A N/A N/A N/A N/A Village Pehalwanke 2008 2008 2009 Trtn/6 PRWSS/ 03-AUG- M/s Deep Digital Survey of 26-Dec- 25-Nov- 02-Dec- 04-Sep- 447 Services/ A 0.20 NS N/A 03-AUG-2009 N/A 2009/0.20/ 81 & Co. / 0 0.20 Village Pehalwanke 2008 2008 2008 2009 Trtn/6 INR / Indian PRWSS/ Digital Survey of 02-Jan- 12-Jan- 03-Sep- 448 Services/ P 0.34 NS N/A N/A N/A N/A N/A N/A Village Sidhwan 2009 2009 2009 Trtn/7 Dhan Dhan Baba Wariyam Singh, PRWSS/ 03-AUG- Digital Survey of 03-Aug- 02-Jan- 12-Jan- Welfare 03-Sep- 449 Services/ A 0.34 NS N/A 03-AUG-2009 N/A 2009/0.34/ 81 0.34 Village Sidhwan 2009 2009 2009 Society, 2009 Trtn/7 INR Pandher Kalan, Distt. Amritsar / 0 / Indian Page 59 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey of 25-Nov- 02-Dec- 03-Sep- 450 Services/ P 0.19 NS N/A N/A N/A N/A N/A N/A Village Darazke 2008 2008 2009 Trtn/8 PRWSS/ 03-AUG- M/s Deep Digital Survey of 26-Dec- 25-Nov- 02-Dec- 03-Sep- 451 Services/ A 0.19 NS N/A 03-AUG-2009 N/A 2009/0.20/ 81 & Co. / 0 0.19 Village Darazke 2008 2008 2008 2009 Trtn/8 INR / Indian PRWSS/ Digital Survey of 08-Feb- 16-Feb- 14-Sep- 452 Services/ P 0.30 NS N/A N/A N/A N/A N/A N/A Village Jagetpura 2009 2009 2009 Trtn/9 Dhan Dhan Baba Wariyam Singh, PRWSS/ 13-AUG- Digital Survey of 02-Feb- 08-Feb- 16-Feb- Welfare 14-Sep- 453 Services/ A 0.30 NS N/A 13-AUG-2009 N/A 2009/0.29/ 81 0.30 Village Jagetpura 2009 2009 2009 Society, 2009 Trtn/9 INR Pandher Kalan, Distt. Amritsar / 0 / Indian Zone: North Zone, Circle: Gurdaspur Circle, District: Gurdaspur PRWSS/ Digital survey of w/s 16-Jun- 19-Jun- 05-Jul- 19-09- 21-Nov- 454 Services/ P 0.60 NS N/A N/A N/A N/A N/A N/A scheme Ghot Pokar 2006 2006 2006 2006 2006 Gsp/1 Gulati PRWSS/ 19-SEP- Associati Digital survey of w/s 19-Jun- 05-Jul- 21-Nov- 455 Services/ A 0.60 NS N/A 19-SEP-2006 N/A 2006/0.60/ 206 on Mohali 0.60 scheme Ghot Pokar 2006 2006 2006 Gsp/1 INR /0/ Indian PRWSS/ Digital Survey for the 05-Sep- 07-Sep- 25-Sep- 08-10- 02-Nov- 456 Services/ P 0.45 NS N/A N/A N/A N/A N/A N/A Village Dadu Jodh 2007 2007 2007 2007 2007 Gsp/10 Page 60 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Pratham Consultin PRWSS/ 08-OCT- Digital Survey for the 07-Sep- 25-Sep- g 02-Nov- 457 Services/ A 0.45 NS N/A 08-OCT-2007 N/A 2007/0.23/ 2218 0.23 Village Dadu Jodh 2007 2007 Engineer 2007 Gsp/10 INR /0/ Indian PRWSS/ Digital Survey for the 01-May- 10-May- 25-May- 03-06- 02-Nov- 458 Services/ P 0.54 NS N/A N/A N/A N/A N/A N/A Village Deda Sainia 2008 2008 2008 2008 2007 Gsp/11 Pratham Consultin PRWSS/ 03-JUN- Digital Survey for the 10-May- 25-May- 339140 g 10-Jul- 459 Services/ A 0.54 NS N/A 03-JUN-2008 N/A 2008/0.38/ 0.38 Village Deda Sainia 2008 2008 73 Engineer 2008 Gsp/11 INR /0/ Indian PRWSS/ Digital Survey for the 15-May- 15-May- 21-May- 21-05- 10-Jul- 460 Services/ P 0.50 NS N/A N/A N/A N/A N/A N/A Village Bhole Ke 2008 2008 2008 2008 2008 Gsp/12 Pratham Consultin PRWSS/ 21-MAY- Digital Survey for the 15-May- 21-May- g 10-Jul- 461 Services/ A 0.50 NS N/A 21-MAY-2008 N/A 2008/0.50/ 3236 0.50 Village Bhole Ke 2008 2008 Engineer 2008 Gsp/12 INR /0/ Indian PRWSS/ Prepared DSR of 15-Mar- 20-Mar- 28-Mar- 28-03- 15-Jul- 462 Services/ P Villages Dadu Yod, 0.05 NS N/A N/A N/A N/A N/A N/A 2008 2008 2008 2008 2008 Gsp/13 Dhande ER. Harbans Singh (Retd. PRWSS/ Prepared DSR of 28-MAR- SDE) , 20-Mar- 28-Mar- 15-Jul- 463 Services/ A Villages Dadu Yod, 0.05 NS N/A 28-MAR-2008 N/A 2008/0.05/ 1852 Building 0.05 2008 2008 2008 Gsp/13 Dhande INR Engineer & Architect, GSP / 0 / Indian Page 61 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Prepared DSR of PRWSS/ Village Kotli Surat 25-Dec- 25-Dec- 31-Dec- 04-01- 22-Jul- 464 Services/ P 0.75 NS N/A N/A N/A N/A N/A N/A Mallian, Mustafapur, 2007 2007 2007 2008 2008 Gsp/14 Kot Main Sahib Bajwa Prepared DSR of Construct PRWSS/ 04-JAN- 763623 Village Kotli Surat 25-Dec- 31-Dec- ion 22-Jul- 465 Services/ A 0.75 NS N/A 04-JAN-2008 N/A 2008/0.75/ 603583 0.75 Mallian, Mustafapur, 2007 2007 Company 2008 Gsp/14 INR 56 Kot Main Sahib GSP / 0 / Indian PRWSS/ Testing SBC of 06-Sep- 11-Sep- 14-Sep- 14-09- 22-Jul- 466 Services/ P Village Chawa, Ghot 0.22 NS N/A N/A N/A N/A N/A N/A 2007 2007 2007 2007 2008 Gsp/15 Pokhar, Mustafapur Dr. Ghuman and PRWSS/ Testing SBC of 14-SEP- 11-Sep- 14-Sep- GGGC/ Gupta 22-Jul- 467 Services/ A Village Chawa, Ghot 0.22 NS N/A 14-SEP-2007 N/A 2007/0.22/ 0.22 2007 2007 B Geotech 2008 Gsp/15 Pokhar, Mustafapur INR Consulta nt / 0 / Indian PRWSS/ Preparing DSR of 05-Jul- 10-Jul- 14-Jul- 14-07- 28-Jul- 468 Services/ P 0.37 NS N/A N/A N/A N/A N/A N/A Dida Sainia 2008 2008 2008 2008 2008 Gsp/16 Sh. 4638, Jaspal PRWSS/ 14-JUL- Preparing DSR of 10-Jul- 14-Jul- 4640,46 Singh 28-Jul- 469 Services/ A 0.37 NS N/A 14-JUL-2008 N/A 2008/0.37/ 0.37 Dida Sainia 2008 2008 36, Cont. 2008 Gsp/16 INR 4644 GSP. / 0 / Indian PRWSS/ Digital Survey for 10-Dec- 15-Dec- 21-Dec- 21-12- 20-Aug- 470 Services/ P Village Dhande, 0.66 NS N/A N/A N/A N/A N/A N/A 2007 2007 2007 2007 2008 Gsp/17 Dhobra, Kotli Muglan Pratham Consultin PRWSS/ Digital Survey for 21-DEC- 15-Dec- 21-Dec- 803880 g 20-Aug- 471 Services/ A Village Dhande, 0.66 NS N/A 21-DEC-2007 N/A 2007/0.66/ 0.66 2007 2007 402219 Engineer 2008 Gsp/17 Dhobra, Kotli Muglan INR /0/ Indian Page 62 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital survey of w/s 12-Apr- 14-Apr- 01-May- 01-06- 10-Jun- 472 Services/ P 0.60 NS N/A N/A N/A N/A N/A N/A scheme Chawa 2006 2006 2006 2006 2006 Gsp/2 S.T PRWSS/ 01-JUN- Digital survey of w/s 14-Apr- 01-May- Associate 10-Jun- 473 Services/ A 0.60 NS N/A 01-JUN-2006 N/A 2006/0.50/ 106 0.50 scheme Chawa 2006 2006 s/0/ 2006 Gsp/2 INR Indian Digital Survey for Village Lahri Veera, Kothe Lohgarh, PRWSS/ Jhande Chack, 05-Jun- 05-Jun- 09-Jun- 09-06- 03-Jul- 474 Services/ P 2.00 NS N/A N/A N/A N/A N/A N/A Narangpur, 2009 2009 2009 2009 2009 Gsp/20 Jhangirpur, Kot Bhalla, Dakhla, Kohlian Digital Survey for Village Lahri Veera, Kishor Kothe Lohgarh, PRWSS/ 09-JUN- Tool & Jhande Chack, 05-Jun- 09-Jun- 03-Jul- 475 Services/ A 2.00 NS N/A 09-JUN-2009 N/A 2009/2.00/ 536 Graphics 2.00 Narangpur, 2009 2009 2009 Gsp/20 INR Ltd. / 0 / Jhangirpur, Kot Indian Bhalla, Dakhla, Kohlian PRWSS/ Digital Survey of 01-May- 01-May- 05-May- 05-05- 11-Nov- 476 Services/ P 0.40 NS N/A N/A N/A N/A N/A N/A Village Shahur 2009 2009 2009 2009 2009 Gsp/22 Mohinder Singh Assitant PRWSS/ 05-MAY- Er.(RTD) Digital Survey of 01-May- 05-May- 11-Nov- 477 Services/ A 0.40 NS N/A 05-MAY-2009 N/A 2009/0.40/ 3965 W/S & 0.40 Village Shahur 2009 2009 2009 Gsp/22 INR Sanitation Deptt. PB. / 0 / Indian PRWSS/ 200 Wall Writings of 05-Mar- 05-Mar- 15-Mar- 15-03- 19-Mar- 478 Services/ P 2.00 NS N/A N/A N/A N/A N/A N/A DPMC GSp 2010 2010 2010 2010 2010 Gsp/23 Page 63 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 J.K Painter PRWSS/ 15-MAR- 200 Wall Writings of 05-Mar- 15-Mar- Kanuwan 19-Mar- 479 Services/ A 2.00 NS N/A 15-MAR-2010 N/A 2010/1.76/ 126 1.76 DPMC GSp 2010 2010 Chownk 2010 Gsp/23 INR GSP / 0 / Indian PRWSS/ 05-Mar- 05-Mar- 15-Mar- 15-03- 19-Mar- 480 Services/ P 10 Street Play 0.60 NS N/A N/A N/A N/A N/A N/A 2010 2010 2010 2010 2010 Gsp/24 Akalpurak h ki Foz (INDIA) Head PRWSS/ 15-MAR- office 05-Mar- 15-Mar- 19-Mar- 481 Services/ A 10 Street Play 0.60 NS N/A 15-MAR-2010 N/A 2010/0.60/ 13 Akal 0.50 2010 2010 2010 Gsp/24 INR office roop nagar ASR / 0 / Indian PRWSS/ 08-Sep- 08-Sep- 06-Oct- 06-10- 16-Mar- 482 Services/ P 20 Street Play 1.15 NS N/A N/A N/A N/A N/A N/A 2009 2009 2009 2009 2010 Gsp/25 Punjab Folk Art Centre GSP(RE PRWSS/ 06-OCT- GD.) C/O 08-Sep- 06-Oct- 16-Mar- 483 Services/ A 20 Street Play 1.15 NS N/A 06-OCT-2009 N/A 2009/0.98/ 9 Harmanpr 0.98 2009 2009 2010 Gsp/25 INR eet Singh D.B.N GSP / 0 / Indian PRWSS/ 29-Jan- 29-Jan- 24-Feb- 24-02- 05-Mar- 484 Services/ P 160 Wall Writings 1.45 NS N/A N/A N/A N/A N/A N/A 2010 2010 2010 2010 2010 Gsp/26 Page 64 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 J.K Painter PRWSS/ 24-FEB- 29-Jan- 24-Feb- Kanuwan 05-Mar- 485 Services/ A 160 Wall Writings 1.45 NS N/A 24-FEB-2010 N/A 2010/1.41/ 119 1.41 2010 2010 Chownk 2010 Gsp/26 INR GSP / 0 / Indian PRWSS/ 16-Nov- 16-Nov- 01-Dec- 01-12- 25-Dec- 486 Services/ P 108 Wall Writings 0.70 NS N/A N/A N/A N/A N/A N/A 2009 2009 2009 2009 2009 Gsp/27 J.K Painter PRWSS/ 01-DEC- 16-Nov- 01-Dec- Kanuwan 25-Dec- 487 Services/ A 108 Wall Writings 0.70 NS N/A 01-DEC-2009 N/A 2009/0.66/ 121 0.66 2009 2009 Chownk 2009 Gsp/27 INR GSP / 0 / Indian PRWSS/ Digital survey of w/s 28-May- 15-May- 01-Jun- 01-06- 10-Jul- 488 Services/ P 1.20 NS N/A N/A N/A N/A N/A N/A scheme Kalanour 2006 2006 2006 2006 2006 Gsp/3 Gulati PRWSS/ 01-JUN- Associati Digital survey of w/s 15-May- 01-Jun- 10-Jul- 489 Services/ A 1.20 NS N/A 01-JUN-2006 N/A 2006/1.20/ 306 on Mohali 1.20 scheme Kalanour 2006 2006 2006 Gsp/3 INR /0/ Indian PRWSS/ Digital survey of w/s 05-Jul- 20-Jun- 08-Jul- 19-09- 21-Nov- 490 Services/ P 0.50 NS N/A N/A N/A N/A N/A N/A scheme Hardorwal 2006 2006 2006 2006 2006 Gsp/4 Gulati PRWSS/ 19-SEP- Associati Digital survey of w/s 20-Jun- 08-Jul- 21-Nov- 491 Services/ A 0.50 NS N/A 19-SEP-2006 N/A 2006/0.50/ 406 on Mohali 0.50 scheme Hardorwal 2006 2006 2006 Gsp/4 INR /0/ Indian PRWSS/ Digital Survey for the 10-Aug- 12-Aug- 27-Aug- 27-09- 27-Nov- 492 Services/ P Village Kotli Surat 0.90 NS N/A N/A N/A N/A N/A N/A 2007 2007 2007 2007 2007 Gsp/5 Mallian Page 65 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Pratham Consultin PRWSS/ Digital Survey for the 27-SEP- 12-Aug- 27-Aug- g 27-Nov- 493 Services/ A Village Kotli Surat 0.90 NS N/A 27-SEP-2007 N/A 2007/0.90/ 507 0.90 2007 2007 Engineer 2007 Gsp/5 Mallian INR /0/ Indian PRWSS/ Digital Survey for the 10-Sep- 12-Sep- 27-Aug- 27-09- 27-Nov- 494 Services/ P 0.25 NS N/A N/A N/A N/A N/A N/A Village Kehra Sultan 2007 2007 2008 2007 2007 Gsp/6 Pratham Consultin PRWSS/ 27-SEP- Digital Survey for the 12-Sep- 27-Aug- g 27-Nov- 495 Services/ A 0.25 NS N/A 27-SEP-2007 N/A 2007/0.25/ 507 0.25 Village Kehra Sultan 2007 2007 Engineer 2007 Gsp/6 INR /0/ Indian PRWSS/ Digital Survey for the 10-Oct- 12-Oct- 27-Aug- 27-09- 27-Nov- 496 Services/ P 0.25 NS N/A N/A N/A N/A N/A N/A Village Dhillwan 2007 2007 2009 2007 2007 Gsp/7 Pratham Consultin PRWSS/ 27-SEP- Digital Survey for the 12-Oct- 27-Aug- g 27-Nov- 497 Services/ A 0.25 NS N/A 27-SEP-2007 N/A 2007/0.25/ 707 0.25 Village Dhillwan 2007 2007 Engineer 2007 Gsp/7 INR /0/ Indian PRWSS/ Digital Survey for the 06-Sep- 08-Sep- 25-Sep- 02-11- 27-Nov- 498 Services/ P 0.70 NS N/A N/A N/A N/A N/A N/A Village Behrampur 2007 2007 2007 2007 2007 Gsp/8 Pratham Consultin PRWSS/ 02-NOV- Digital Survey for the 08-Sep- 25-Sep- g 01-Dec- 499 Services/ A 0.70 NS N/A 02-NOV-2007 N/A 2007/0.70/ 845 0.70 Village Behrampur 2007 2007 Engineer 2007 Gsp/8 INR /0/ Indian PRWSS/ Testing of SBC of 20-Aug- 22-Aug- 10-Sep- 14-09- 24-Sep- 500 Services/ P 0.12 NS N/A N/A N/A N/A N/A N/A Hardorawal 2009 2007 2007 2007 2007 Gsp/9 Page 66 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Ghuman PRWSS/ 14-SEP- CIEPT/ & Gupta Testing of SBC of 22-Aug- 10-Sep- 24-Sep- 501 Services/ A 0.12 NS N/A 14-SEP-2007 N/A 2007/0.12/ ASR/PT Geo Tech 0.12 Hardorawal 2007 2007 2007 Gsp/9 INR C/2008 /0/ Indian Zone: North Zone, Circle: Hoshiarpur Circle, District: Hoshiarpur PRWSS/ Digital Survey of 20-Mar- 26-Mar- 09-02- 01-Sep- 502 Services/ P 0.23 NS N/A N/A N/A N/A N/A N/A village Makhangarh 2009 2009 2009 2010 Hsp/1 Gurdev PRWSS/ 09-FEB- Digital Survey of 20-Mar- 26-Mar- Consulta 12-Oct- 503 Services/ A 0.23 NS N/A 09-FEB-2009 N/A 2009/0.22/ 1620 0.20 village Makhangarh 2009 2009 ncy / 0 / 2009 Hsp/1 INR Indian PRWSS/ Digital Survey of 25-Feb- 03-Mar- 504 Services/ P 0.25 NS N/A N/A N/A N/A N/A N/A village Turan 2009 2009 Hsp/10 Gurdev PRWSS/ 02-MAR- Digital Survey of 25-Feb- 03-Mar- Consulta 24-Nov- 505 Services/ A 0.25 NS N/A 02-MAR-2009 N/A 2009/0.28/ 2817 0.20 village Turan 2009 2009 ncy / 0 / 2009 Hsp/10 INR Indian PRWSS/ Digital Survey of 19-Dec- 26-Dec- 27-Mar- 506 Services/ P 0.25 NS N/A N/A N/A N/A N/A N/A village Turan 2007 2007 2009 Hsp/11 Gurdev PRWSS/ 20-MAR- Digital Survey of 19-Dec- 26-Dec- Consulta 507 Services/ A 0.25 NS N/A 20-MAR-2008 N/A 2008/0.28/ 2817 0.00 village Turan 2007 2007 ncy / 0 / Hsp/11 INR Indian PRWSS/ Digital Survey of 25-Feb- 02-Mar- 27-Mar- 508 Services/ P 0.25 NS N/A N/A N/A N/A N/A N/A village Tulluwal 2009 2009 2009 Hsp/12 Gurdev PRWSS/ 03-MAR- Digital Survey of 25-Feb- 02-Mar- Consulta 24-Nov- 509 Services/ A 0.25 NS N/A 03-MAR-2009 N/A 2009/0.25/ 2811 2.04 village Tulluwal 2009 2009 ncy / 0 / 2009 Hsp/12 INR Indian Page 67 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey of 25-Feb- 02-Mar- 27-Mar- 510 Services/ P 0.25 NS N/A N/A N/A N/A N/A N/A village Jahidpur 2009 2009 2009 Hsp/13 Gurdev PRWSS/ 03-MAR- Digital Survey of 25-Feb- 02-Mar- Consulta 26-Nov- 511 Services/ A 0.25 NS N/A 03-MAR-2009 N/A 2009/0.25/ 2814 0.20 village Jahidpur 2009 2009 ncy / 0 / 2009 Hsp/13 INR Indian PRWSS/ 11-Apr- 19-Nov- 26-02- 27-Feb- 512 Services/ P Wall Writing 0.30 NS N/A N/A N/A N/A N/A N/A 2008 2008 2009 2009 Hsp/14 Mataru PRWSS/ 26-FEB- 11-Apr- 19-Nov- art 27-Feb- 513 Services/ A Wall Writing 0.30 NS N/A 26-FEB-2009 N/A 2009/0.25/ 248 0.24 2008 2008 studio,Ta 2009 Hsp/14 INR nda / 0 / PRWSS/ 10-Feb- 17-Feb- 22-02- 514 Services/ P Puppet Show 0.19 NS N/A N/A N/A N/A N/A N/A 2010 2010 2010 Hsp/15 Badri PRWSS/ 22-FEB- Bhutt, 10-Feb- 17-Feb- 31-Mar- 515 Services/ A Puppet Show 0.19 NS N/A 22-FEB-2010 N/A 2010/0.19/ 530 Chandiga 0.11 2010 2010 2010 Hsp/15 INR rh / 0 / Indian PRWSS/ 14-Jan- 22-Jan- 22-02- 516 Services/ P Wall Writting 0.30 NS N/A N/A N/A N/A N/A N/A 2010 2010 2010 Hsp/16 Surindra Arts PRWSS/ 22-FEB- 14-Jan- 22-Jan- Studio,Ho 31-Mar- 517 Services/ A Wall Writting 0.30 NS N/A 22-FEB-2010 N/A 2010/0.14/ 527 0.14 2010 2010 shiarpur / 2010 Hsp/16 INR 0 / Indian PRWSS/ 27-Jul- 27-Jul- 27-07- 30-Jul- 518 Services/ P Wall Writing 0.30 NS N/A N/A N/A N/A N/A N/A 2010 2010 2010 2010 Hsp/17 Page 68 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Surindra Arts PRWSS/ 27-JUL- 27-Jul- 27-Jul- Studio,Ho 31-Mar- 519 Services/ A Wall Writing 0.30 NS N/A 27-JUL-2010 N/A 2010/0.30/ 786 0.19 2010 2010 shiarpur / 2011 Hsp/17 INR 0 / Indian PRWSS/ 27-Jul- 27-Jul- 27-07- 08-May- 520 Services/ P Wall Writing 0.30 NS N/A N/A N/A N/A N/A N/A 2010 2010 2010 2010 Hsp/19 Surindra Arts PRWSS/ 27-JUL- 27-Jul- 27-Jul- Studio,Ho 31-Mar- 521 Services/ A Wall Writing 0.30 NS N/A 27-JUL-2010 N/A 2010/0.43/ 786 0.04 2010 2010 shiarpur / 2011 Hsp/19 INR 0 / Indian PRWSS/ Digital survey of 12-Jan- 27-Jan- 26-02- 31-Mar- 522 Services/ P 0.23 NS N/A N/A N/A N/A N/A N/A village Rani Pind 2009 2009 2009 2009 Hsp/3 Pratham Consultin PRWSS/ 26-FEB- Digital survey of 12-Jan- 27-Jan- g 31-Mar- 523 Services/ A 0.23 NS N/A 26-FEB-2009 N/A 2009/0.22/ 1569 0.22 village Rani Pind 2009 2009 Engineer 2009 Hsp/3 INR /0/ Indian PRWSS/ Digital survey of 18-Mar- 25-Mar- 31-May- 524 Services/ P 0.24 NS N/A N/A N/A N/A N/A N/A village Birampur 2009 2009 2009 Hsp/4 Pratham Consultin PRWSS/ 18-MAY- Digital survey of 18-Mar- 25-Mar- g 31-May- 525 Services/ A 0.24 NS N/A 18-MAY-2009 N/A 2009/0.24/ 3508 0.23 village Birampur 2009 2009 Engineer 2009 Hsp/4 INR /0/ Indian PRWSS/ Digital Survey of 19-Feb- 26-Feb- 31-Mar- 526 Services/ P Village Ram Nagar 0.26 NS N/A N/A N/A N/A N/A N/A 2009 2009 2009 Hsp/5 urf Dhaha Page 69 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Pratham Consultin PRWSS/ Digital Survey of 25-MAR- 19-Feb- 26-Feb- g 31-Mar- 527 Services/ A Village Ram Nagar 0.26 NS N/A 25-MAR-2009 N/A 2009/0.26/ 2423 0.39 2009 2009 Engineer 2009 Hsp/5 urf Dhaha INR /0/ Indian PRWSS/ Digital Survey of 19-Dec- 26-Dec- 20-03- 31-Mar- 528 Services/ P 0.28 NS N/A N/A N/A N/A N/A N/A Village Badowal 2007 2007 2008 2008 Hsp/6 Gulati PRWSS/ 20-MAR- Associati Digital Survey of 19-Dec- 26-Dec- 31-Mar- 529 Services/ A 0.28 NS N/A 20-MAR-2008 N/A 2008/0.28/ 2316 on Mohali 0.00 Village Badowal 2007 2007 2008 Hsp/6 INR /0/ Indian PRWSS/ Digital Survey of 02-Feb- 10-Feb- 31-Mar- 530 Services/ P Village Pandori 0.28 NS N/A N/A N/A N/A N/A N/A 2009 2009 2008 Hsp/7 Mehtwan Pratham Consultin PRWSS/ Digital Survey of 15-MAR- 02-Feb- 10-Feb- g 31-Mar- 531 Services/ A Village Pandori 0.28 NS N/A 15-MAR-2009 N/A 2009/0.24/ 2263 0.26 2009 2009 Engineer 2008 Hsp/7 Mehtwan INR /0/ Indian PRWSS/ Digital Survey of 22-Apr- 28-Apr- 30-Aug- 532 Services/ P 0.50 NS N/A N/A N/A N/A N/A N/A village,Bulluwal 2008 2008 2009 Hsp/8 Pratham Consultin PRWSS/ 07-APR- Digital Survey of 22-Apr- 28-Apr- g 30-Aug- 533 Services/ A 0.50 NS N/A 07-APR-2008 N/A 2008/0.84/ 4750 0.84 village,Bulluwal 2008 2008 Engineer 2009 Hsp/8 INR /0/ Indian PRWSS/ Digital Survey of 19-Dec- 26-Dec- 31-Mar- 534 Services/ P Village,Bains 0.28 NS N/A N/A N/A N/A N/A N/A 2007 2007 2008 Hsp/9 Taniwal Page 70 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Gulati PRWSS/ Digital Survey of 20-MAR- Associati 19-Dec- 26-Dec- 31-Mar- 535 Services/ A Village,Bains 0.28 NS N/A 20-MAR-2008 N/A 2008/0.23/ 2314 on Mohali 0.29 2007 2007 2008 Hsp/9 Taniwal INR /0/ Indian Zone: North Zone, Circle: Hoshiarpur Circle, District: Nawanshahar PRWSS/ 10-Dec- 10-Dec- 17-Dec- 28-12- 31-Mar- 536 Services/ P Wall Writing 0.75 NS N/A N/A N/A N/A N/A N/A 2009 2009 2009 2009 2010 Nshr/2 M/S Rakesh Sharma, Nayyer PRWSS/ 28-DEC- 10-Dec- 17-Dec- Colony, 12-Feb- 537 Services/ A Wall Writing 0.75 NS N/A 28-DEC-2009 N/A 2009/0.75/ 556 0.17 2009 2009 Kulam 2009 Nshr/2 INR Road, Nawansh ehar / 0 / Indian PRWSS/ 10-Dec- 10-Dec- 18-Dec- 28-12- 31-Mar- 538 Services/ P Puppet Show 0.30 NS N/A N/A N/A N/A N/A N/A 2009 2009 2009 2009 2010 Nshr/3 Badri PRWSS/ 28-DEC- Bhutt, 10-Dec- 18-Dec- 30-Dec- 539 Services/ A Puppet Show 0.30 NS N/A 28-DEC-2009 N/A 2009/0.13/ 536 Chandiga 0.13 2009 2009 2009 Nshr/3 INR rh / 0 / Indian PRWSS/ 19-Jan- 19-Jan- 29-Jan- 29-01- 31-Mar- 540 Services/ P Puppet Show 0.21 NS N/A N/A N/A N/A N/A N/A 2010 2010 2010 2010 2010 Nshr/4 Badri PRWSS/ 29-JAN- Bhutt, 19-Jan- 29-Jan- 17-Mar- 541 Services/ A Puppet Show 0.21 NS N/A 29-JAN-2010 N/A 2010/0.21/ 610 Chandiga 0.21 2010 2010 2010 Nshr/4 INR rh / 0 / Indian Page 71 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ 19-03- 31-Mar- 542 Services/ P Wall Writing 0.60 NS N/A N/A N/A N/A N/A N/A 2010 2010 Nshr/5 M/S Rakesh Sharma, Nayyer PRWSS/ 19-MAR- 12-Oct- 28-Dec- Colony, 25-Jun- 543 Services/ A Wall Writing 0.60 NS N/A 19-MAR-2010 N/A 2010/0.26/ 752 1.04 2009 2009 Kulam 2012 Nshr/5 INR Road, Nawansh ehar / 0 / Indian PRWSS/ Digital Survey for 19-Nov- 27-Nov- 23-Feb- 544 Services/ P W/S Scheme 0.79 NS N/A N/A N/A N/A N/A N/A 2007 2007 2008 Nshr/6 Langroya Gulati PRWSS/ Digital Survey for Associati 19-Nov- 27-Nov- 545 Services/ A W/S Scheme 0.79 NS N/A N/A 6971 on Mohali 0.00 2007 2007 Nshr/6 Langroya /0/ Indian PRWSS/ Digital Survey for 12-Dec- 26-Dec- 30-01- 25-Feb- 546 Services/ P W/S Scheme 0.50 NS N/A N/A N/A N/A N/A N/A 2007 2007 2008 2008 Nshr/7 Thandian Gurdev PRWSS/ Digital Survey for 30-JAN- 12-Dec- 26-Dec- Consulta 547 Services/ A W/S Scheme 0.50 NS N/A 30-JAN-2008 N/A 2008/0.39/ 6900 0.00 2007 2007 ncy / 0 / Nshr/7 Thandian INR Indian PRWSS/ Digital Survey for 12-Dec- 26-Dec- 30-01- 28-Feb- 548 Services/ P 0.59 NS N/A N/A N/A N/A N/A N/A W/S Scheme Bharoli 2007 2007 2008 2008 Nshr/8 Gurdev PRWSS/ 30-JAN- Digital Survey for 12-Dec- 26-Dec- Consulta 23-Sep- 549 Services/ A 0.59 NS N/A 30-JAN-2008 N/A 2008/0.59/ 6902 0.04 W/S Scheme Bharoli 2007 2007 ncy / 0 / 2009 Nshr/8 INR Indian Zone: North Zone, Circle: Jalandhar Circle, District: Jalandhar Page 72 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS To conduct digital 25-Nov- 10-Dec- 14-Jan- 20-04- 20-Apr- 550 P-Jal- P survey with Total 60.00 NCB 01-12-2008 15-MAR-2009 01-12-2008 N/A N/A N/A N/A 2008 2008 2009 2009 2010 B1-S-25 Station Method M/s BLG Construct PRWSS To conduct digital 01-JUN- ion 22-Jan- 20-Oct- 22-Nov- 551 P-Jal- A survey with Total 60.00 NCB 25-11-2008 01-JUN-2009 30-04-2009 2009/6.00/ Services 34 40.00 2009 2008 2008 B1-S-25 Station Method INR Pvt. Ltd., Jodhpur / 0 / Indian PRWSS/ Wall Writing in Pilot SHOPPI 14-Nov- 14-Nov- 28-Nov- 12-02- 01-Jan- 552 Services/ P Batch & Batch -1 0.29 N/A 12-FEB-2008 N/A N/A N/A N/A N/A NG 2008 2008 2008 2008 2009 Jal/2 villages M/sBham bra Construct ion Pvt. PRWSS/ Wall Writing in Pilot 12-FEB- Ltd. 312, SHOPPI 14-Nov- 14-Nov- 28-Nov- 02-Dec- 553 Services/ A Batch & Batch -1 0.29 N/A 12-FEB-2008 N/A 2008/0.29/ 467 New 0.29 NG 2008 2008 2008 2008 Jal/2 villages INR Jwahar Nagar Jalandhar /0/ Indian Wall Writing in Pilot Batch & Batch -1, PRWSS/ Batch-2 SHOPPI 07-Dec- 07-Dec- 21-Dec- 31-12- 04-Feb- 554 Services/ P villages(World Bank 0.41 N/A 31-DEC-2009 N/A N/A N/A N/A N/A NG 2009 2009 2009 2009 2010 Jal/3 Assisted) and SWAp villages other than World Bank Project. M/s Aman Wall Writing in Pilot Cards Batch & Batch -1, Bhagat PRWSS/ Batch-2 31-DEC- SHOPPI 07-Dec- 07-Dec- 21-Dec- Singh 04-Feb- 555 Services/ A villages(World Bank 0.41 N/A 31-DEC-2009 N/A 2009/0.41/ 1525 0.40 NG 2009 2009 2009 Chownk 2010 Jal/3 Assisted) and SWAp INR Near villages other than Water World Bank Project. Tank Jalandhar Page 73 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 /0/ Indian PRWSS/ Wall Writing in New SHOPPI 14-Jul- 14-Jul- 29-Jul- 02-08- 30-Jan- 556 Services/ P 0.30 N/A 02-AUG-2010 N/A N/A N/A N/A N/A Villages NG 2010 2010 2010 2010 2011 Jal/4 PRWSS/ 02-AUG- Wall Writing in New SHOPPI 14-Jul- 14-Jul- 29-Jul- /0/ 30-Jan- 557 Services/ A 0.30 N/A 02-AUG-2010 N/A 2010/0.30/ 0.14 Villages NG 2010 2010 2010 Indian 2011 Jal/4 INR Zone: North Zone, Circle: Jalandhar Circle, District: Kapurthala PRWSS/ Wall writting in Pilot, SHOPPI 07-Aug- 07-Aug- 25-Aug- 29-09- 05-Nov- 558 Services/ P Batch-I, Batch II 0.49 N/A 29-SEP-2009 N/A N/A N/A N/A N/A NG 2009 2009 2009 2009 2009 Kpth/1 Villages (30 Nos) M/s Rajinder Singh RK, Arts PRWSS/ Wall writting in Pilot, 29-SEP- 07-Aug- 07-Aug- 25-Aug- Gali No. 05-Nov- 559 Services/ A Batch-I, Batch II 0.49 NS N/A 29-SEP-2009 N/A 2009/0.47/ 214 0.47 2009 2009 2009 2, Jagatjit 2009 Kpth/1 Villages (30 Nos) INR Park, Kapurthal a/0/ Indian PRWSS/ Invitation of SHOPPI 13-Nov- 13-Nov- 02-Dec- 04-12- 28-Feb- 560 Services/ P quotation for hiring of 0.65 N/A 04-DEC-2009 N/A N/A N/A N/A N/A NG 2009 2009 2009 2009 2010 Kpth/3 TATA Indica Car M/s K S Tour & Travels, PRWSS/ Invitation of 04-DEC- 13-Nov- 13-Nov- 02-Dec- VPO Safi 28-Feb- 561 Services/ A quotation for hiring of 0.65 NS N/A 04-DEC-2009 N/A 2009/0.64/ 293 0.64 2009 2009 2009 Pind 2010 Kpth/3 TATA Indica Car INR Jalandhar /0/ Indian Page 74 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Puppet Show in the SHOPPI 22-Dec- 22-Dec- 18-Jan- 18-01- 25-Feb- 562 Services/ P 0.20 N/A 18-JAN-2010 N/A N/A N/A N/A N/A Villages NG 2009 2009 2010 2010 2010 Kpth/4 Badri PRWSS/ 18-JAN- Bhutt, Puppet Show in the 22-Dec- 22-Dec- 18-Jan- 25-Feb- 563 Services/ A 0.20 NS N/A 18-JAN-2010 N/A 2010/0.19/ 393 Chandiga 0.19 Villages 2009 2009 2010 2010 Kpth/4 INR rh / 0 / Indian PRWSS/ Invitation of SHOPPI 28-Oct- 28-Oct- 11-Nov- 25-11- 10-Nov- 564 Services/ P quotation for hiring of 0.25 N/A 25-NOV-2008 N/A N/A N/A N/A N/A NG 2008 2008 2008 2008 2009 Kpth/5 TATA Indica Car M/s Abhi Consulta nt Old PRWSS/ Invitation of 25-NOV- Church 28-Oct- 28-Oct- 11-Nov- 10-Dec- 565 Services/ A quotation for hiring of 0.25 NS N/A 25-NOV-2008 N/A 2008/0.23/ 368 Road, 0.23 2008 2008 2008 2008 Kpth/5 TATA Indica Car INR Jalandhar Cantt, 144001 / 0 / Indian PRWSS/ Invitation fo SHOPPI 27-Nov- 27-Nov- 10-Dec- 11-12- 09-Dec- 566 Services/ P quotation for hiring of 0.20 N/A 11-DEC-2008 N/A N/A N/A N/A N/A NG 2008 2008 2008 2008 2009 Kpth/6 TATA Indica Car M/s Channi Tour & PRWSS/ Invitation fo 11-DEC- Travel 27-Nov- 27-Nov- 10-Dec- 31-Oct- 567 Services/ A quotation for hiring of 0.20 NS N/A 11-DEC-2008 N/A 2008/1.82/ 401 BSF 2.03 2008 2008 2008 2009 Kpth/6 TATA Indica Car INR Chownk Jalandhar /0/ Indian Zone: South Zone, Circle: Chandigarh Circle, District: Ropar PRWSS/ 25-Jun- 07-Jul- 20-07- 15-Aug- 568 Services/ P Digital Survey 0.99 NCB N/A N/A N/A N/A N/A N/A 2006 2006 2006 2006 Rpr/1 Page 75 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Gurdev PRWSS/ 20-JUL- 12-Jun- 25-Jun- 07-Jul- Consulta 15-Aug- 569 Services/ A Digital Survey 0.99 NCB N/A 20-JUL-2006 N/A 2006/0.99/ 50024 0.99 2006 2006 2006 ncy / 0 / 2006 Rpr/1 INR Indian PRWSS/ Digital Survey 25-May- 570 Services/ P 0.40 NCB N/A N/A N/A N/A N/A N/A (Dholran) 2008 Rpr/10 Gurdev PRWSS/ 21-APR- Digital Survey 07-Mar- 19-Mar- 01-Apr- Consulta 25-May- 571 Services/ A 0.40 NCB N/A 21-APR-2008 N/A 2008/0.40/ 4352 0.40 (Dholran) 2008 2008 2008 ncy / 0 / 2008 Rpr/10 INR Indian PRWSS/ Digital Survey (Jhinjri 02-Jul- 02-Jul- 14-07- 21-Jul- 572 Services/ P 0.23 NCB N/A N/A N/A N/A N/A N/A N.P.) 2008 2008 2008 2008 Rpr/11 Gurdev PRWSS/ 14-JUL- Digital Survey (Jhinjri 16-Jun- 02-Jul- 02-Jul- Consulta 21-Jul- 573 Services/ A 0.23 NCB N/A 14-JUL-2008 N/A 2008/0.23/ 106 0.23 N.P.) 2009 2009 2009 ncy / 0 / 2008 Rpr/11 INR Indian PRWSS/ Digital Survey 27-Mar- 27-Mar- 06-05- 13-May- 574 Services/ P 0.25 NCB N/A N/A N/A N/A N/A N/A (Jhandian Khurd) 2008 2008 2008 2008 Rpr/12 Gurdev PRWSS/ 06-MAY- Digital Survey 07-Mar- 27-Mar- 27-Mar- Consulta 06-Jul- 575 Services/ A 0.25 NCB N/A 06-MAY-2008 N/A 2008/0.25/ 1555 0.25 (Jhandian Khurd) 2008 2008 2008 ncy / 0 / 2008 Rpr/12 INR Indian PRWSS/ Digital Survey 10-Dec- 10-Dec- 20-12- 24-Dec- 576 Services/ P 0.56 NCB N/A N/A N/A N/A N/A N/A (Balewal) 2007 2007 2008 2008 Rpr/13 Gurdev PRWSS/ 20-DEC- Digital Survey 02-Dec- 10-Dec- 10-Dec- Consulta 20-Feb- 577 Services/ A 0.56 NCB N/A 20-DEC-2008 N/A 2008/0.56/ 6566 0.56 (Balewal) 2007 2007 2007 ncy / 0 / 2009 Rpr/13 INR Indian Page 76 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey 11-Feb- 11-Feb- 18-02- 25-Feb- 578 Services/ P 0.30 NCB N/A N/A N/A N/A N/A N/A (Lalpur) 2009 2009 2009 2009 Rpr/14 Gurdev PRWSS/ 18-FEB- Digital Survey 04-Feb- 11-Feb- 11-Feb- Consulta 18-Apr- 579 Services/ A 0.30 NCB N/A 18-FEB-2009 N/A 2009/0.30/ 1441 0.30 (Lalpur) 2009 2009 2009 ncy / 0 / 2009 Rpr/14 INR Indian Street Play PRWSS/ Performers for 580 Services/ P 0.25 NCB N/A N/A N/A N/A N/A N/A DPMC, OFFICE, Rpr/16 ROPAR Performer s Street Play PRWSS/ 15-MAR- Associati Performers for 25-Jan- 05-Feb- 31-Mar- 581 Services/ A 0.21 NS N/A 15-MAR-2010 N/A 2010/0.21/ 3145 on 0.21 DPMC, OFFICE, 2010 2010 2010 Rpr/16 INR Punjab, ROPAR Ropar / 0 / Indian PRWSS/ 08-Feb- 20-Feb- 20-07- 15-Aug- 582 Services/ P Digital Survey 0.35 NCB N/A N/A N/A N/A N/A N/A 2008 2008 2006 2006 Rpr/2 Gurdev PRWSS/ 27-FEB- 02-Feb- 08-Feb- 20-Feb- Consulta 31-Mar- 583 Services/ A Digital Survey 0.35 NCB N/A 27-FEB-2008 N/A 2008/0.35/ 652 0.35 2008 2008 2008 ncy / 0 / 2009 Rpr/2 INR Indian PRWSS/ 08-May- 23-May- 18-Jun- 584 Services/ P Digital Survey (Katli ) 0.29 NCB N/A N/A N/A N/A N/A N/A 2008 2008 2008 Rpr/3 Gurdev PRWSS/ 31-MAY- 02-May- 08-May- 23-May- Consulta 30-Jul- 585 Services/ A Digital Survey (Katli ) 0.29 NCB N/A 31-MAY-2008 N/A 2008/0.29/ 56 0.29 2008 2008 2008 ncy / 0 / 2008 Rpr/3 INR Indian PRWSS/ Digital Survey 18-Feb- 20-Feb- 27-02- 20-Mar- 586 Services/ P 0.35 NCB N/A N/A N/A N/A N/A N/A (Panjola) 2008 2008 2008 2009 Rpr/4 Page 77 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Gurdev PRWSS/ 27-FEB- Digital Survey 05-Feb- 08-Feb- 20-Feb- Consulta 31-Mar- 587 Services/ A 0.35 NCB N/A 27-FEB-2008 N/A 2008/0.35/ 10114 0.35 (Panjola) 2008 2008 2008 ncy / 0 / 2009 Rpr/4 INR Indian PRWSS/ Digital Survey 08-Feb- 20-Feb- 27-02- 10-Mar- 588 Services/ P 0.29 NCB N/A N/A N/A N/A N/A N/A (Kamalpur) 2008 2008 2008 2008 Rpr/5 Gurdev PRWSS/ 27-FEB- Digital Survey 05-Feb- 08-Feb- 20-Feb- Consulta 31-Mar- 589 Services/ A 0.29 NCB N/A 27-FEB-2008 N/A 2008/0.29/ 61 0.29 (Kamalpur) 2008 2008 2008 ncy / 0 / 2008 Rpr/5 INR Indian PRWSS/ Digital Survey 20-May- 590 Services/ P 0.40 NCB N/A N/A N/A N/A N/A N/A (Behrampur Bet) 2008 Rpr/6 Gurdev PRWSS/ 04-FEB- Digital Survey 10-Jan- 15-Jan- 30-Jan- Consulta 30-Apr- 591 Services/ A 0.40 NCB N/A 04-FEB-2008 N/A 2008/0.40/ 14960 0.40 (Behrampur Bet) 2008 2008 2008 ncy / 0 / 2008 Rpr/6 INR Indian PRWSS/ Digital Survey 20-May- 592 Services/ P 0.40 NCB N/A N/A N/A N/A N/A N/A (Chitamali) 2008 Rpr/7 Gurdev PRWSS/ 27-MAR- Digital Survey 20-Feb- 26-Feb- 20-Mar- Consulta 25-May- 593 Services/ A 0.40 NCB N/A 27-MAR-2008 N/A 2008/0.40/ 14264 0.40 (Chitamali) 2008 2008 2008 ncy / 0 / 2008 Rpr/7 INR Indian PRWSS/ Digital Survey (Bhoje 20-May- 594 Services/ P 0.40 NCB N/A N/A N/A N/A N/A N/A Majra) 2008 Rpr/8 Gurdev PRWSS/ 27-MAR- Digital Survey (Bhoje 20-Feb- 26-Feb- 20-Mar- Consulta 25-May- 595 Services/ A 0.40 NCB N/A 27-MAR-2008 N/A 2008/0.40/ 14269 0.40 Majra) 2008 2008 2008 ncy / 0 / 2008 Rpr/8 INR Indian Page 78 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey 25-May- 596 Services/ P 0.40 NCB N/A N/A N/A N/A N/A N/A (Dhianpura) 2008 Rpr/9 Gurdev PRWSS/ 04-FEB- Digital Survey 04-Jan- 20-Jan- 30-Jan- Consulta 31-Mar- 597 Services/ A 0.40 NCB N/A 04-FEB-2008 N/A 2008/0.40/ 15097 0.40 (Dhianpura) 2008 2008 2008 ncy / 0 / 2008 Rpr/9 INR Indian Zone: South Zone, Circle: Chandigarh Circle, District: SAS Nagar PRWSS/ Digital Survey, SHOPPI 25-Jun- 01-Jul- 15-Jul- 20-07- 30-Jul- 598 Services/ P 0.60 N/A 20-JUL-2009 N/A N/A N/A N/A N/A Tasimbly NG 2009 2009 2009 2009 2009 Mhl/10 Gurdev PRWSS/ 05-AUG- Digital Survey, SHOPPI 15-Jun- 01-Jul- 15-Jul- Consulta 10-Aug- 599 Services/ A 0.60 N/A 05-AUG-2009 N/A 2009/0.60/ 1 0.60 Tasimbly NG 2009 2009 2009 ncy / 0 / 2009 Mhl/10 INR Indian PRWSS/ Digital Survey, SHOPPI 02-Jan- 08-Jan- 22-Jan- 25-01- 30-Jan- 600 Services/ P 0.22 N/A 25-JAN-2010 N/A N/A N/A N/A N/A Malikpur NG 2010 2010 2010 2010 2010 Mhl/11 Gurdev PRWSS/ 18-FEB- Digital Survey, SHOPPI 04-Jan- 08-Jan- 22-Jan- Consulta 11-Jun- 601 Services/ A 0.22 N/A 18-FEB-2010 N/A 2010/0.22/ 1 0.22 Malikpur NG 2010 2010 2010 ncy / 0 / 2009 Mhl/11 INR Indian PRWSS/ Digital Survey Guno SHOPPI 04-Jan- 11-Jan- 27-Jan- 15-02- 20-Feb- 602 Services/ P 0.22 N/A 15-FEB-2010 N/A N/A N/A N/A N/A Majra NG 2010 2010 2010 2010 2010 Mhl/12 Gurdev PRWSS/ 15-FEB- Digital Survey Guno SHOPPI 04-Jan- 11-Jan- 27-Jan- Consulta 18-Feb- 603 Services/ A 0.22 N/A 15-FEB-2010 N/A 2010/0.22/ 256 0.22 Majra NG 2010 2010 2010 ncy / 0 / 2010 Mhl/12 INR Indian PRWSS/ Digital Survey, SHOPPI 04-Jan- 11-Jan- 27-Jan- 15-02- 20-Feb- 604 Services/ P 0.20 N/A 15-FEB-2010 N/A N/A N/A N/A N/A Dangdehra NG 2010 2010 2010 2010 2010 Mhl/13 Page 79 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Gurdev PRWSS/ 15-FEB- Digital Survey, SHOPPI 04-Jan- 11-Jan- 27-Jan- Consulta 28-Feb- 605 Services/ A 0.20 N/A 15-FEB-2010 N/A 2010/0.20/ 165 0.20 Dangdehra NG 2010 2010 2010 ncy / 0 / 2010 Mhl/13 INR Indian PRWSS/ Digital Survey SHOPPI 03-Jan- 11-Jan- 22-Jan- 28-01- 10-Feb- 606 Services/ P 0.20 N/A 28-JAN-2010 N/A N/A N/A N/A N/A Sandanpur NG 2010 2010 2010 2010 2010 Mhl/14 Gurdev PRWSS/ 14-FEB- Digital Survey SHOPPI 04-Jan- 11-Jan- 22-Jan- Consulta 28-Feb- 607 Services/ A 0.20 N/A 14-FEB-2010 N/A 2010/0.20/ 423 0.20 Sandanpur NG 2010 2010 2010 ncy / 0 / 2010 Mhl/14 INR Indian PRWSS/ Digital Survey, SHOPPI 02-Oct- 06-Oct- 20-Jun- 28-06- 10-Jul- 608 Services/ P 0.60 N/A 28-JUN-2009 N/A N/A N/A N/A N/A Amlala NG 2009 2009 2009 2009 2009 Mhl/15 Gurdev PRWSS/ 08-NOV- Digital Survey, SHOPPI 25-Sep- 06-Oct- 20-Oct- Consulta 25-Nov- 609 Services/ A 0.60 N/A 08-NOV-2009 N/A 2009/0.60/ 123 0.60 Amlala NG 2009 2009 2009 ncy / 0 / 2009 Mhl/15 INR Indian PRWSS/ Digital Survey, SHOPPI 25-Nov- 01-Dec- 16-Dec- 20-12- 31-Dec- 610 Services/ P 0.40 N/A 20-DEC-2008 N/A N/A N/A N/A N/A Gulabgarh NG 2008 2008 2008 2008 2008 Mhl/16 Gurdev PRWSS/ 04-JAN- Digital Survey, SHOPPI 19-Nov- 01-Dec- 16-Dec- Consulta 31-Jan- 611 Services/ A 0.40 N/A 04-JAN-2009 N/A 2009/0.40/ 563 0.40 Gulabgarh NG 2008 2008 2008 ncy / 0 / 2009 Mhl/16 INR Indian PRWSS/ Digital Survey, SHOPPI 01-Jan- 05-Jan- 15-Jan- 20-01- 30-Jan- 612 Services/ P 0.40 N/A 20-JAN-2009 N/A N/A N/A N/A N/A Bhagwanpur NG 2009 2009 2009 2009 2009 Mhl/17 Gurdev PRWSS/ 26-JAN- Digital Survey, SHOPPI 01-Jan- 05-Jan- 15-Jan- Consulta 31-Jan- 613 Services/ A 0.40 N/A 26-JAN-2009 N/A 2009/0.40/ 823 0.40 Bhagwanpur NG 2009 2009 2009 ncy / 0 / 2009 Mhl/17 INR Indian Page 80 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey, SHOPPI 25-Jan- 01-Feb- 15-Feb- 20-02- 28-Feb- 614 Services/ P 0.22 N/A 20-FEB-2009 N/A N/A N/A N/A N/A Kuranwala NG 2009 2009 2009 2009 2009 Mhl/18 Gurdev PRWSS/ 05-MAR- Digital Survey, SHOPPI 15-Jan- 01-Feb- 15-Feb- Consulta 01-Mar- 615 Services/ A 0.22 N/A 05-MAR-2009 N/A 2009/0.22/ 563 0.22 Kuranwala NG 2009 2009 2009 ncy / 0 / 2009 Mhl/18 INR Indian PRWSS/ Digital Survey, Kheri SHOPPI 25-Jan- 01-Feb- 15-Feb- 20-02- 28-Feb- 616 Services/ P 0.40 N/A 20-FEB-2009 N/A N/A N/A N/A N/A Gujran NG 2009 2009 2009 2009 2009 Mhl/19 Gurdev PRWSS/ 04-MAR- Digital Survey, Kheri SHOPPI 18-Jan- 01-Feb- 15-Feb- Consulta 31-Mar- 617 Services/ A 0.40 N/A 04-MAR-2009 N/A 2009/0.40/ 289 0.40 Gujran NG 2009 2009 2009 ncy / 0 / 2009 Mhl/19 INR Indian PRWSS/ Digital Survey, SHOPPI 10-Jan- 16-Jan- 25-Jan- 20-01- 30-Jan- 618 Services/ P 0.40 N/A 20-JAN-2009 N/A N/A N/A N/A N/A Boothgarh NG 2009 2009 2009 2009 2009 Mhl/20 Gurdev PRWSS/ 15-FEB- Digital Survey, SHOPPI 18-Jan- 16-Jan- 25-Jan- Consulta 28-Feb- 619 Services/ A 0.40 N/A 15-FEB-2009 N/A 2009/0.40/ 386 0.40 Boothgarh NG 2009 2009 2009 ncy / 0 / 2009 Mhl/20 INR Indian PRWSS/ Digital Survey, SHOPPI 25-Nov- 01-Dec- 11-Dec- 15-12- 31-Dec- 620 Services/ P 0.22 N/A 15-DEC-2008 N/A N/A N/A N/A N/A Fatehgarh NG 2008 2008 2008 2008 2008 Mhl/21 Gurdev PRWSS/ 20-DEC- Digital Survey, SHOPPI 15-Nov- 01-Dec- 11-Dec- Consulta 31-Dec- 621 Services/ A 0.22 N/A 20-DEC-2008 N/A 2008/0.22/ 2563 0.22 Fatehgarh NG 2008 2008 2008 ncy / 0 / 2008 Mhl/21 INR Indian PRWSS/ SHOPPI 28-Dec- 05-Dec- 25-Dec- 27-12- 30-Jan- 622 Services/ P Wall Writing 0.40 N/A 27-DEC-2008 N/A N/A N/A N/A N/A NG 2008 2008 2008 2008 2009 Mhl/4 Page 81 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Er. Jagjit PRWSS/ 27-DEC- SHOPPI 22-Nov- 05-Dec- 25-Dec- Singh 31-Dec- 623 Services/ A Wall Writing 0.40 N/A 27-DEC-2008 N/A 2008/0.37/ 843 0.40 NG 2008 2008 2008 Virk / 0 / 2008 Mhl/4 INR Indian PRWSS/ Digital Survey, Lalru SHOPPI 21-Nov- 01-Dec- 11-Dec- 20-12- 31-Dec- 624 Services/ P 2.03 N/A 20-DEC-2008 N/A N/A N/A N/A N/A Mandi NG 2008 2008 2008 2008 2008 Mhl/5 Gurdev PRWSS/ 25-DEC- Digital Survey, Lalru 01-Dec- 11-Dec- Consulta 31-Dec- 625 Services/ A 2.03 NS N/A 25-DEC-2008 N/A 2008/2.03/ 169 2.03 Mandi 2008 2008 ncy / 0 / 2008 Mhl/5 INR Indian PRWSS/ Digital Survey, SHOPPI 01-Jun- 05-Jun- 15-Jun- 25-06- 10-Jul- 626 Services/ P 0.25 N/A 25-JUN-2009 N/A N/A N/A N/A N/A Magra NG 2009 2009 2009 2009 2009 Mhl/6 Gurdev PRWSS/ 28-JUN- Digital Survey, SHOPPI 24-May- 05-Jun- 15-Jun- Consulta 30-Jun- 627 Services/ A 0.25 N/A 28-JUN-2009 N/A 2009/0.25/ 1167 0.25 Magra NG 2009 2009 2009 ncy / 0 / 2009 Mhl/6 INR Indian PRWSS/ Digital Survey, SHOPPI 29-Jun- 05-Jun- 15-Jun- 25-06- 15-Jul- 628 Services/ P 0.25 N/A 25-JUN-2009 N/A N/A N/A N/A N/A Choundheri NG 2009 2009 2009 2009 2009 Mhl/7 Gurdev PRWSS/ 28-JUN- Digital Survey, SHOPPI 02-Jun- 05-Jun- 15-Jun- Consulta 30-Jun- 629 Services/ A 0.25 N/A 28-JUN-2009 N/A 2009/0.25/ 1426 0.25 Choundheri NG 2009 2009 2009 ncy / 0 / 2009 Mhl/7 INR Indian PRWSS/ Digital Survey, SHOPPI 01-Jul- 06-Jul- 21-Jul- 01-08- 20-Aug- 630 Services/ P 0.25 N/A 01-AUG-2009 N/A N/A N/A N/A N/A Bhagwasi NG 2009 2009 2009 2009 2010 Mhl/8 Gurdev PRWSS/ 29-JUL- Digital Survey, SHOPPI 28-May- 06-Jul- 21-Jul- Consulta 30-Jul- 631 Services/ A 0.25 N/A 29-JUL-2009 N/A 2009/0.25/ 468 0.25 Bhagwasi NG 2009 2009 2009 ncy / 0 / 2009 Mhl/8 INR Indian Page 82 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ Digital Survey, SHOPPI 02-May- 10-May- 25-May- 05-05- 20-May- 632 Services/ P 0.25 N/A 05-MAY-2009 N/A N/A N/A N/A N/A Bhukhri NG 2009 2009 2009 2009 2009 Mhl/9 Gurdev PRWSS/ 06-JUN- Digital Survey, SHOPPI 03-May- 10-May- 25-May- Consulta 30-Dec- 633 Services/ A 0.25 N/A 06-JUN-2009 N/A 2009/0.03/ 591 0.25 Bhukhri NG 2009 2009 2009 ncy / 0 / 2009 Mhl/9 INR Indian Zone: South Zone, Circle: Patiala Circle, District: Fatehgarh Sahib PRWSS/ Digital Survey 15-Sep- 15-Sep- 30-Sep- 01-10- 31-Mar- 634 Services/ P (Bullewas 0.28 ICB N/A 01-OCT-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2009 2010 Fth/10 Mukandpur) S.T PRWSS/ Digital Survey 01-OCT- 15-Sep- 15-Sep- 30-Sep- Associate 31-Mar- 635 Services/ A (Bullewas 0.28 ICB N/A 01-OCT-2009 N/A 2009/0.28/ 7 0.28 2009 2009 2009 s/0/ 2010 Fth/10 Mukandpur) INR Indian PRWSS/ Digital Survey 15-Sep- 15-Sep- 30-Sep- 01-10- 31-Mar- 636 Services/ P 0.29 ICB N/A 01-OCT-2009 N/A N/A N/A N/A N/A (Rasulpur) 2009 2009 2009 2009 2010 Fth/11 S.T PRWSS/ 01-OCT- Digital Survey 15-Sep- 15-Sep- 30-Sep- Associate 31-Mar- 637 Services/ A 0.29 ICB N/A 01-OCT-2009 N/A 2009/0.29/ 7 0.29 (Rasulpur) 2009 2009 2009 s/0/ 2010 Fth/11 INR Indian PRWSS/ Digital Survey 27-Mar- 27-Mar- 13-Apr- 13-04- 25-Jan- 638 Services/ P 0.20 ICB N/A 13-APR-2009 N/A N/A N/A N/A N/A (Jiwanpura) 2009 2009 2009 2009 2010 Fth/12 PRWSS/ Digital Survey 27-Mar- 27-Mar- 13-Apr- 639 Services/ A 0.20 ICB N/A N/A (Jiwanpura) 2009 2009 2009 Fth/12 PRWSS/ Digital Survey 29-Sep- 29-Sep- 14-Oct- 15-10- 11-Feb- 640 Services/ P 0.35 ICB N/A 15-OCT-2008 N/A N/A N/A N/A N/A (Nabipur) 2008 2008 2008 2008 2010 Fth/13 Page 83 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Kulwinder PRWSS/ 15-OCT- Contracto Digital Survey 29-Sep- 29-Sep- 14-Oct- 11-Feb- 641 Services/ A 0.35 ICB N/A 15-OCT-2008 N/A 2008/0.35/ 5 r Ambala 0.35 (Nabipur) 2008 2008 2008 2010 Fth/13 INR Cantt. / 0 / Indian PRWSS/ Digital Survey 10-Sep- 10-Sep- 25-Sep- 26-10- 11-Jan- 642 Services/ P 0.20 ICB N/A 26-OCT-2008 N/A N/A N/A N/A N/A (Mehtabgarh) 2008 2008 2008 2008 2010 Fth/14 Kulwinder PRWSS/ 26-OCT- Contracto Digital Survey 10-Sep- 10-Sep- 25-Sep- 11-Jun- 643 Services/ A 0.20 ICB N/A 26-OCT-2008 N/A 2008/0.20/ 5 r Ambala 0.25 (Mehtabgarh) 2008 2008 2008 2010 Fth/14 INR Cantt. / 0 / Indian PRWSS/ Digital Survey 25-Sep- 25-Sep- 10-Oct- 11-10- 11-Jan- 644 Services/ P 0.35 ICB N/A 11-OCT-2008 N/A N/A N/A N/A N/A (Mughal Majra) 2008 2008 2008 2008 2010 Fth/15 Kulwinder PRWSS/ 11-OCT- Contracto Digital Survey 25-Sep- 25-Sep- 10-Oct- 11-Jun- 645 Services/ A 0.35 ICB N/A 11-OCT-2008 N/A 2008/0.35/ 5 r Ambala 0.35 (Mughal Majra) 2008 2008 2008 2010 Fth/15 INR Cantt. / 0 / Indian PRWSS/ Digital Survey (Kheri 30-Jun- 01-Jul- 16-Jul- 17-07- 11-Jul- 646 Services/ P 0.35 ICB N/A 17-JUL-2010 N/A N/A N/A N/A N/A Bhai Ki) 2010 2010 2010 2010 2011 Fth/16 S.T PRWSS/ 17-JUL- Digital Survey (Kheri 01-Jul- 01-Jul- 16-Jul- Associate 11-Jul- 647 Services/ A 0.35 ICB N/A 17-JUL-2010 N/A 2010/0.35/ 0.35 Bhai Ki) 2010 2010 2010 s/0/ 2011 Fth/16 INR Indian PRWSS/ 21-Nov- 21-Nov- 28-Nov- 12-12- 19-Dec- 648 Services/ P Wall writing 0.26 ICB N/A 12-DEC-2008 N/A N/A N/A N/A N/A 2008 2008 2008 2008 2008 Fth/3 Minta PRWSS/ 12-DEC- 21-Nov- 21-Nov- 28-Nov- Arts 19-Dec- 649 Services/ A Wall writing 0.26 ICB N/A 12-DEC-2008 N/A 2008/0.25/ 428 0.26 2008 2008 2008 Studio / 0 2008 Fth/3 INR / Indian Page 84 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ 22-Oct- 22-Oct- 05-Nov- 16-11- 25-Nov- 650 Services/ P Puppet Show 0.38 ICB N/A 16-NOV-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2009 2009 Fth/5 Badri PRWSS/ 16-NOV- Bhutt, 22-Oct- 22-Oct- 05-Nov- 25-Nov- 651 Services/ A Puppet Show 0.38 ICB N/A 16-NOV-2009 N/A 2009/0.38/ 414 Chandiga 0.14 2009 2009 2009 2009 Fth/5 INR rh / 0 / Indian PRWSS/ 16-Nov- 16-Nov- 02-Dec- 15-12- 03-Mar- 652 Services/ P Muniyadi 0.05 ICB N/A 15-DEC-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2009 2010 Fth/6 Kulwant PRWSS/ 15-DEC- Sound 16-Nov- 16-Nov- 02-Dec- 03-Mar- 653 Services/ A Muniyadi 0.05 ICB N/A 15-DEC-2009 N/A 2009/0.05/ 540 Service 0.06 2009 2009 2009 2010 Fth/6 INR Sirhind / 0 / Indian PRWSS/ 05-Sep- 05-Sep- 20-Sep- 21-09- 30-Sep- 654 Services/ P Dedran 0.20 ICB N/A 21-SEP-2008 N/A N/A N/A N/A N/A 2008 2008 2008 2008 2008 Fth/7 Gurdev PRWSS/ 21-SEP- 05-Sep- 05-Sep- 20-Sep- Consulta 30-Sep- 655 Services/ A Dedran 0.20 ICB N/A 21-SEP-2008 N/A 2008/0.20/ 7 0.20 2008 2008 2008 ncy / 0 / 2008 Fth/7 INR Indian PRWSS/ Digital Survey 05-Sep- 05-Sep- 20-Sep- 21-09- 30-Sep- 656 Services/ P 0.20 ICB N/A 21-SEP-2008 N/A N/A N/A N/A N/A (Kalaundi) 2008 2008 2008 2008 2008 Fth/8 Gurdev PRWSS/ 21-SEP- Digital Survey 05-Sep- 05-Sep- 20-Sep- Consulta 30-Sep- 657 Services/ A 0.20 ICB N/A 21-SEP-2008 N/A 2008/0.20/ 7 0.20 (Kalaundi) 2008 2008 2008 ncy / 0 / 2008 Fth/8 INR Indian PRWSS/ Digital Survey 13-Sep- 13-Sep- 28-Sep- 29-09- 28-Oct- 658 Services/ P 0.25 ICB N/A 29-SEP-2008 N/A N/A N/A N/A N/A (Jakhwali) 2008 2008 2008 2008 2008 Fth/9 Page 85 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Kulwinder PRWSS/ 29-SEP- Contracto Digital Survey 13-Sep- 13-Sep- 28-Sep- 28-Oct- 659 Services/ A 0.25 ICB N/A 29-SEP-2008 N/A 2008/0.25/ 6 r Ambala 0.25 (Jakhwali) 2008 2008 2008 2008 Fth/9 INR Cantt. / 0 / Indian Zone: South Zone, Circle: Patiala Circle, District: Patiala PRWSS/ Gagrola (Digital 14-May- 18-May- 02-Jun- 05-06- 30-Jun- 660 Services/ P 0.20 ICB N/A 05-JUN-2009 N/A N/A N/A N/A N/A Survey) 2009 2009 2009 2009 2009 Ptl/10 Kulwinder PRWSS/ 05-JUN- Contracto Gagrola (Digital 14-May- 18-May- 02-Jun- 30-Jun- 661 Services/ A 0.20 NS N/A 05-JUN-2009 N/A 2009/0.00/ 306 r Ambala 0.20 Survey) 2009 2009 2009 2009 Ptl/10 INR Cantt. / 0 / Indian PRWSS/ Tajalpur (Digital 29-Sep- 06-Oct- 21-Oct- 24-10- 20-Nov- 662 Services/ P 0.15 ICB N/A 24-OCT-2008 N/A N/A N/A N/A N/A Survey) 2008 2008 2008 2008 2008 Ptl/11 Kulwinder PRWSS/ 24-OCT- Contracto Tajalpur (Digital 29-Sep- 06-Oct- 21-Oct- 20-Nov- 663 Services/ A 0.15 NS N/A 24-OCT-2008 N/A 2008/0.00/ 28 r Ambala 0.15 Survey) 2008 2008 2008 2008 Ptl/11 INR Cantt. / 0 / Indian PRWSS/ Kotli (Bearing 30-Jul- 04-Aug- 19-Aug- 25-08- 20-Sep- 664 Services/ P 0.10 ICB N/A 25-AUG-2008 N/A N/A N/A N/A N/A Capacity) 2008 2008 2008 2008 2008 Ptl/12 AKSS Consulta nts & PRWSS/ 25-AUG- Kotli (Bearing 30-Jul- 04-Aug- 19-Aug- Engineer 20-Sep- 665 Services/ A 0.10 NS N/A 25-AUG-2008 N/A 2008/0.10/ 4 0.10 Capacity) 2008 2008 2008 s 2008 Ptl/12 INR Bathinda /0/ Indian PRWSS/ Jore Majra (Bearing 27-Aug- 01-Sep- 16-Sep- 19-09- 15-Oct- 666 Services/ P 0.10 ICB N/A 19-SEP-2008 N/A N/A N/A N/A N/A Capacity) 2008 2008 2008 2008 2008 Ptl/13 Page 86 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 AKSS Consulta nts & PRWSS/ 19-SEP- Jore Majra (Bearing 27-Aug- 01-Sep- 16-Sep- Engineer 15-Oct- 667 Services/ A 0.10 NS N/A 19-SEP-2008 N/A 2008/0.10/ 13 0.10 Capacity) 2008 2008 2008 s 2008 Ptl/13 INR Bathinda /0/ Indian PRWSS/ Sidhuwal (Bearing 24-Oct- 03-Nov- 18-Nov- 21-11- 18-Dec- 668 Services/ P 0.10 ICB N/A 21-NOV-2008 N/A N/A N/A N/A N/A Capacity) 2008 2008 2008 2008 2008 Ptl/14 AKSS Consulta nts & PRWSS/ 21-NOV- Sidhuwal (Bearing 24-Oct- 03-Nov- 18-Nov- Engineer 18-Dec- 669 Services/ A 0.10 NS N/A 21-NOV-2008 N/A 2008/0.10/ 37 0.10 Capacity) 2008 2008 2008 s 2008 Ptl/14 INR Bathinda /0/ Indian PRWSS/ Chuhat (Bearing 28-Apr- 18-May- 02-Jun- 05-06- 28-Jun- 670 Services/ P 0.10 ICB N/A 05-JUN-2009 N/A N/A N/A N/A N/A Capacity) 2009 2009 2009 2009 2009 Ptl/15 AKSS Consulta nts & PRWSS/ 05-JUN- Chuhat (Bearing 28-Apr- 18-May- 02-Jun- Engineer 28-Jun- 671 Services/ A 0.10 NS N/A 05-JUN-2009 N/A 2009/0.10/ 309 0.10 Capacity) 2009 2009 2009 s 2009 Ptl/15 INR Bathinda /0/ Indian PRWSS/ Kadrabad (Bearing 28-Nov- 04-Dec- 19-Dec- 24-12- 20-Jan- 672 Services/ P 0.10 ICB N/A 24-DEC-2008 N/A N/A N/A N/A N/A Capacity) 2008 2008 2008 2008 2009 Ptl/16 AKSS Consulta PRWSS/ 24-DEC- nts & Kadrabad (Bearing 28-Nov- 04-Dec- 19-Dec- 20-Jan- 673 Services/ A 0.10 NS N/A 24-DEC-2008 N/A 2008/0.10/ 46 Engineer 0.10 Capacity) 2008 2008 2008 2009 Ptl/16 INR s Bathinda /0/ Page 87 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Indian PRWSS/ Khanpur Gorian 08-May- 18-May- 02-Jun- 05-06- 30-Jun- 674 Services/ P 0.10 ICB N/A 05-JUN-2009 N/A N/A N/A N/A N/A (Bearing Capacity) 2009 2009 2009 2009 2009 Ptl/17 AKSS Consulta nts & PRWSS/ 05-JUN- Khanpur Gorian 08-May- 18-May- 02-Jun- Engineer 30-Jun- 675 Services/ A 0.10 NS N/A 05-JUN-2009 N/A 2009/0.10/ 315 0.10 (Bearing Capacity) 2009 2009 2009 s 2009 Ptl/17 INR Bathinda /0/ Indian PRWSS/ Gagrola (Bearing 08-May- 18-May- 02-Jun- 05-06- 30-Jun- 676 Services/ P 0.10 ICB N/A 05-JUN-2009 N/A N/A N/A N/A N/A Capacity) 2009 2009 2009 2009 2009 Ptl/18 AKSS Consulta nts & PRWSS/ 05-JUN- Gagrola (Bearing 08-May- 18-May- 02-Jun- Engineer 30-Jun- 677 Services/ A 0.10 NS N/A 05-JUN-2009 N/A 2009/0.10/ 312 0.10 Capacity) 2009 2009 2009 s 2009 Ptl/18 INR Bathinda /0/ Indian PRWSS/ Tajalpur (Bearing 01-Oct- 06-Oct- 21-Oct- 24-10- 20-Nov- 678 Services/ P 0.10 ICB N/A 24-OCT-2008 N/A N/A N/A N/A N/A Capacity) 2008 2008 2008 2008 2008 Ptl/19 AKSS Consulta nts & PRWSS/ 24-OCT- Tajalpur (Bearing 01-Oct- 06-Oct- 21-Oct- Engineer 20-Nov- 679 Services/ A 0.10 NS N/A 24-OCT-2008 N/A 2008/0.10/ 25 0.10 Capacity) 2008 2008 2008 s 2008 Ptl/19 INR Bathinda /0/ Indian Page 88 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ 16-Nov- 18-Nov- 04-Dec- 21-12- 31-Jan- 680 Services/ P Puppet Show 0.38 ICB N/A 21-DEC-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2009 2010 Ptl/2 Badri PRWSS/ 21-DEC- Bhutt, 16-Nov- 18-Nov- 04-Dec- 31-Jan- 681 Services/ A Puppet Show 0.38 NS N/A 21-DEC-2009 N/A 2009/0.38/ 705 Chandiga 0.38 2009 2009 2009 2010 Ptl/2 INR rh / 0 / Indian PRWSS/ Jabo Majra (Digital 02-Jun- 05-Jun- 10-Jun- 03-07- 03-Jul- 682 Services/ P 0.28 ICB N/A 03-JUL-2009 N/A N/A N/A N/A N/A Survey) 2009 2009 2009 2009 2009 Ptl/20 Gurdev PRWSS/ 03-JUL- Jabo Majra (Digital 02-Jun- 05-Jun- 10-Jun- Consulta 03-Jul- 683 Services/ A 0.28 NS N/A 03-JUL-2009 N/A 2009/0.28/ 1 0.28 Survey) 2009 2009 2009 ncy / 0 / 2009 Ptl/20 INR Indian PRWSS/ Tasoli (Digital 25-Jun- 30-Jun- 03-Jul- 10-07- 20-Jul- 684 Services/ P 0.28 ICB N/A 10-JUL-2009 N/A N/A N/A N/A N/A Survey) 2009 2009 2009 2009 2009 Ptl/21 Gurdev PRWSS/ 10-JUL- Tasoli (Digital 25-Jun- 30-Jun- 03-Jul- Consulta 20-Jul- 685 Services/ A 0.28 NS N/A 10-JUL-2009 N/A 2009/0.28/ 2 0.28 Survey) 2009 2009 2009 ncy / 0 / 2009 Ptl/21 INR Indian PRWSS/ Tepla (Digital 29-May- 03-Jun- 10-Jun- 03-07- 03-Jul- 686 Services/ P 0.56 ICB N/A 03-JUL-2009 N/A N/A N/A N/A N/A Survey) 2009 2009 2009 2009 2009 Ptl/22 Gurdev PRWSS/ 03-JUL- Tepla (Digital 29-May- 03-Jun- 10-Jun- Consulta 03-Jul- 687 Services/ A 0.56 NS N/A 03-JUL-2009 N/A 2009/0.56/ 1 0.56 Survey) 2009 2009 2009 ncy / 0 / 2009 Ptl/22 INR Indian PRWSS/ Jalalpur (Digital 20-Aug- 24-Aug- 01-Sep- 03-09- 17-Sep- 688 Services/ P 0.26 ICB N/A 03-SEP-2009 N/A N/A N/A N/A N/A Survey) 2009 2009 2009 2009 2009 Ptl/23 Page 89 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Gurdev PRWSS/ 03-SEP- Jalalpur (Digital 20-Aug- 24-Aug- 01-Sep- Consulta 17-Sep- 689 Services/ A 0.26 NS N/A 03-SEP-2009 N/A 2009/0.26/ 1 0.26 Survey) 2009 2009 2009 ncy / 0 / 2009 Ptl/23 INR Indian PRWSS/ Darwa (Digital 04-Jun- 08-Jun- 10-Jun- 03-07- 03-Jul- 690 Services/ P 0.22 ICB N/A 03-JUL-2009 N/A N/A N/A N/A N/A Survey) 2009 2009 2009 2009 2009 Ptl/24 Gurdev PRWSS/ 03-JUL- Darwa (Digital 04-Jun- 08-Jun- 10-Jun- Consulta 03-Jul- 691 Services/ A 0.22 NS N/A 03-JUL-2009 N/A 2009/0.22/ 1 0.22 Survey) 2009 2009 2009 ncy / 0 / 2009 Ptl/24 INR Indian PRWSS/ Butta Singh Wala 21-Aug- 24-Aug- 01-Sep- 03-09- 10-Sep- 692 Services/ P 0.67 ICB N/A 03-SEP-2009 N/A N/A N/A N/A N/A (Digital Survey) 2009 2009 2009 2009 2009 Ptl/25 Gurdev PRWSS/ 03-SEP- Butta Singh Wala 21-Aug- 24-Aug- 01-Sep- Consulta 10-Sep- 693 Services/ A 0.67 NS N/A 03-SEP-2009 N/A 2009/0.67/ 1 0.67 (Digital Survey) 2009 2009 2009 ncy / 0 / 2009 Ptl/25 INR Indian PRWSS/ 03-Jan- 05-Jan- 20-Jan- 21-01- 20-Jan- 694 Services/ P Wall Writing 1.00 ICB N/A 21-JAN-2011 N/A N/A N/A N/A N/A 2011 2011 2011 2011 2012 Ptl/26 PRWSS/ 21-JAN- Shimpy 03-Jan- 05-Jan- 20-Jan- 695 Services/ A Wall Writing 1.00 NS N/A 21-JAN-2011 N/A 2011/1.00/ 50 Publicity / 0.11 2011 2011 2011 Ptl/26 INR 0 / Indian PRWSS/ 19-Oct- 22-Oct- 04-Nov- 30-11- 31-Dec- 696 Services/ P Wall Writing 1.34 ICB N/A 30-NOV-2009 N/A N/A N/A N/A N/A 2009 2009 2009 2009 2010 Ptl/3 PRWSS/ 30-NOV- Shimpy 19-Oct- 22-Oct- 04-Nov- 31-Dec- 697 Services/ A Wall Writing 1.34 NS N/A 30-NOV-2009 N/A 2009/0.84/ 633 Publicity / 1.34 2009 2009 2009 2010 Ptl/3 INR 0 / Indian Page 90 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ 698 Services/ P Kotli 0.20 ICB N/A N/A N/A N/A N/A N/A Ptl/4 PRWSS/ 699 Services/ A Kotli NS N/A N/A Ptl/4 PRWSS/ Jore Majra (Digital 28-Aug- 01-Sep- 16-Sep- 19-09- 15-Oct- 700 Services/ P 0.20 ICB N/A 19-SEP-2008 N/A N/A N/A N/A N/A Survey) 2008 2008 2008 2008 2008 Ptl/5 Kulwinder PRWSS/ 19-SEP- Contracto Jore Majra (Digital 28-Aug- 01-Sep- 16-Sep- 15-Oct- 701 Services/ A 0.20 NS N/A 19-SEP-2008 N/A 2008/0.00/ 16 r Ambala 0.20 Survey) 2008 2008 2008 2008 Ptl/5 INR Cantt. / 0 / Indian PRWSS/ Sidhuwal(Digital 30-Oct- 03-Nov- 18-Nov- 21-11- 18-Dec- 702 Services/ P 0.20 ICB N/A 21-NOV-2008 N/A N/A N/A N/A N/A Survey) 2008 2008 2008 2008 2008 Ptl/6 Kulwinder PRWSS/ 21-NOV- Contracto Sidhuwal(Digital 30-Oct- 03-Nov- 18-Nov- 18-Dec- 703 Services/ A 0.20 NS N/A 21-NOV-2008 N/A 2008/0.00/ 40 r Ambala 0.20 Survey) 2008 2008 2008 2008 Ptl/6 INR Cantt. / 0 / Indian PRWSS/ Chuhat(Digital 13-May- 18-May- 02-Jun- 05-06- 28-Jun- 704 Services/ P 0.15 ICB N/A 05-JUN-2009 N/A N/A N/A N/A N/A Survey) 2009 2009 2009 2009 2009 Ptl/7 Kulwinder PRWSS/ 05-JUN- Contracto Chuhat(Digital 13-May- 18-May- 02-Jun- 28-Jun- 705 Services/ A 0.15 NS N/A 05-JUN-2009 N/A 2009/0.00/ 300 r Ambala 0.15 Survey) 2009 2009 2009 2009 Ptl/7 INR Cantt. / 0 / Indian PRWSS/ 706 Services/ P Kadrabad 0.20 ICB N/A N/A N/A N/A N/A N/A Ptl/8 Page 91 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ 707 Services/ A Kadrabad N/A N/A Ptl/8 PRWSS/ Khanpur 14-May- 18-May- 02-Jun- 05-06- 30-Jun- 708 Services/ P 0.10 ICB N/A 05-JUN-2009 N/A N/A N/A N/A N/A Gorian(Digital 2009 2009 2009 2009 2009 Ptl/9 Survey) Kulwinder PRWSS/ 05-JUN- Contracto Khanpur 14-May- 18-May- 02-Jun- 30-Jun- 709 Services/ A 0.10 NS N/A 05-JUN-2009 N/A 2009/0.00/ 303 r Ambala 0.10 Gorian(Digital 2009 2009 2009 2009 Ptl/9 INR Cantt. / 0 Survey) / Indian Zone: South Zone, Circle: Sangrur Circle, District: Barnala PRWSS- SNK Toll free No. SHOPPI 15-May- 04-May- 15-May- 15-05- 20-Jun- 710 S-DIV65- P wall writing at 4 0.82 15-MAY-2012 N/A N/A N/A N/A NG 2012 2012 2012 2012 2012 1938 prominent places. PRWSS- SNK Toll free No. SHOPPI 15-May- 04-May- 15-May- 711 S-DIV65- A wall writing at 4 0.82 NG 2012 2012 2012 1938 prominent places. PRWSS/ 13-Sep- 27-Sep- 05-Oct- 712 Services/ P Wall Writting 0.50 NCB N/A 05-OCT-2011 N/A N/A N/A N/A N/A 2011 2011 2011 Brn/3 Harpreet PRWSS/ 25-SEP- Singh(Art SHOPPI 02-Sep- 25-Sep- 02-Oct- 713 Services/ A Wall Writting 0.29 N/A 25-SEP-2011 N/A 2011/0.29/ 574 s), 0.29 NG 2011 2011 2011 Brn/3 INR Sherpur / 0 / Indian Zone: South Zone, Circle: Sangrur Circle, District: Sangrur PRWSS- SHOPPI 27-Feb- 05-Mar- 31-Mar- 714 S-DIV63- P Wall Writings 1.00 N/A N/A N/A N/A N/A N/A NG 2012 2012 2012 1627 Page 92 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS- 14-MAR- Sarwan SHOPPI 24-Feb- 02-Mar- 30-Mar- 715 S-DIV63- A Wall Writings 1.00 N/A 14-MAR-2012 N/A 2012/1.00/ Singh / 0 0.99 NG 2012 2012 2012 1627 INR / Indian PRWSS- SHOPPI 27-Feb- 05-Mar- 31-Mar- 716 S-DIV63- P Street Play 1.00 N/A N/A N/A N/A N/A N/A NG 2012 2012 2012 1628 PRWSS- 14-MAR- Noor Art SHOPPI 24-Feb- 02-Mar- 30-Mar- 717 S-DIV63- A Street Play 1.00 N/A 14-MAR-2012 N/A 2012/1.00/ Group / 0 0.84 NG 2012 2012 2012 1628 INR / Indian PRWSS- SNK Toll free No. SHOPPI 17-Aug- 24-Aug- 25-08- 30-Sep- 718 S-DIV63- P wall writing at 4 2.50 N/A N/A N/A N/A NG 2012 2012 2012 2012 1936 prominent places. PRWSS/ SHOPPI 04-Jan- 11-Jan- 12-01- 31-Dec- 719 Services/ P Muniyadi 0.05 N/A 12-JAN-2010 N/A N/A N/A N/A N/A NG 2010 2010 2010 2010 Sng/1 PRWSS/ 12-JAN- Naresh 04-Jan- 11-Jan- 31-Dec- 720 Services/ A Muniyadi 0.05 NS N/A 12-JAN-2010 N/A 2010/0.05/ 55 Kumar / 0 0.05 2010 2010 2010 Sng/1 INR / Indian PRWSS/ SHOPPI 08-Feb- 18-Feb- 07-03- 07-Mar- 721 Services/ P Mattran 0.22 N/A 07-MAR-2008 N/A N/A N/A N/A N/A NG 2008 2008 2008 2009 Sng/10 Kulwinder PRWSS/ 07-MAR- Contracto 08-Feb- 18-Feb- 07-Mar- 722 Services/ A Mattran 0.22 NS N/A 07-MAR-2008 N/A 2008/0.22/ 35 r Ambala 0.20 2008 2008 2009 Sng/10 INR Cantt. / 0 / Indian PRWSS/ SHOPPI 08-Feb- 18-Feb- 07-03- 07-Mar- 723 Services/ P Gharachon 1.00 N/A 10-MAR-2008 N/A N/A N/A N/A N/A NG 2008 2008 2008 2009 Sng/11 Page 93 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Kulwinder PRWSS/ 07-MAR- Contracto 08-Feb- 18-Feb- 07-Mar- 724 Services/ A Gharachon 1.00 NS N/A 07-MAR-2008 N/A 2008/1.00/ 36 r Ambala 0.98 2008 2008 2009 Sng/11 INR Cantt. / 0 / Indian PRWSS/ SHOPPI 08-Feb- 18-Feb- 07-03- 01-Oct- 725 Services/ P Noorpura 0.28 N/A 07-MAR-2007 N/A N/A N/A N/A N/A NG 2007 2007 2007 2007 Sng/12 Kulwinder PRWSS/ 07-MAR- Contracto SHOPPI 08-Feb- 18-Feb- 07-Mar- 726 Services/ A Noorpura 0.28 N/A 07-MAR-2007 N/A 2007/0.28/ 37 r Ambala 0.25 NG 2007 2007 2009 Sng/12 INR Cantt. / 0 / Indian PRWSS/ SHOPPI 11-Sep- 22-Sep- 14-11- 14-Nov- 727 Services/ P Kapial 0.35 N/A 14-NOV-2008 N/A N/A N/A N/A N/A NG 2008 2008 2008 2008 Sng/13 Kulwinder PRWSS/ 14-NOV- Contracto 11-Sep- 22-Sep- 14-Nov- 728 Services/ A Kapial 0.35 NS N/A 14-NOV-2008 N/A 2008/0.35/ 56 r Ambala 0.34 2008 2008 2008 Sng/13 INR Cantt. / 0 / Indian PRWSS/ SHOPPI 31-Dec- 29-Jan- 15-02- 28-Feb- 729 Services/ P Gehlan 0.20 N/A 15-FEB-2009 N/A N/A N/A N/A N/A NG 2008 2009 2009 2009 Sng/14 Kulwinder PRWSS/ 15-FEB- Contracto 31-Dec- 29-Jan- 28-Feb- 730 Services/ A Gehlan 0.20 NS N/A 15-FEB-2009 N/A 2009/0.20/ 78 r Ambala 0.16 2008 2009 2009 Sng/14 INR Cantt. / 0 / Indian PRWSS/ SHOPPI 31-Dec- 29-Jan- 02-02- 28-Feb- 731 Services/ P Dittupur 0.05 N/A 02-FEB-2009 N/A N/A N/A N/A N/A NG 2008 2009 2009 2009 Sng/15 Kulwinder PRWSS/ 02-FEB- Contracto 31-Dec- 29-Jan- 02-Mar- 732 Services/ A Dittupur 0.05 NS N/A 02-FEB-2009 N/A 2009/0.05/ 79 r Ambala 0.04 2008 2009 2009 Sng/15 INR Cantt. / 0 / Indian Page 94 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ SHOPPI 31-Dec- 29-Jan- 02-02- 28-Feb- 733 Services/ P Sangatpura 0.12 N/A 02-FEB-2009 N/A N/A N/A N/A N/A NG 2008 2009 2009 2009 Sng/16 Kulwinder PRWSS/ 02-FEB- Contracto 31-Dec- 29-Jan- 28-Feb- 734 Services/ A Sangatpura 0.12 NS N/A 02-FEB-2009 N/A 2009/0.12/ 80 r Ambala 0.10 2008 2009 2009 Sng/16 INR Cantt. / 0 / Indian PRWSS/ SHOPPI 31-Dec- 29-Jan- 02-03- 02-Mar- 735 Services/ P Ghumand singh wala 0.10 N/A 27-FEB-2009 N/A N/A N/A N/A N/A NG 2008 2009 2009 2009 Sng/17 Kulwinder PRWSS/ 02-MAR- Contracto 31-Dec- 29-Jan- 02-Mar- 736 Services/ A Ghumand singh wala 0.10 NS N/A 02-MAR-2009 N/A 2009/0.10/ 81 r Ambala 0.09 2008 2009 2009 Sng/17 INR Cantt. / 0 / Indian PRWSS/ SHOPPI 31-Dec- 15-Jan- 02-02- 28-Feb- 737 Services/ P Mehsampur 0.17 N/A 30-JAN-2009 N/A N/A N/A N/A N/A NG 2008 2009 2009 2009 Sng/18 Kulwinder PRWSS/ 30-JAN- Contracto 31-Dec- 15-Jan- 28-Feb- 738 Services/ A Mehsampur 0.17 NS N/A 30-JAN-2009 N/A 2009/0.17/ 82 r Ambala 0.16 2008 2009 2009 Sng/18 INR Cantt. / 0 / Indian PRWSS/ SHOPPI 19-May- 28-May- 08-06- 08-Jun- 739 Services/ P Rampur Gujran 0.15 N/A 08-JUN-2009 N/A N/A N/A N/A N/A NG 2009 2009 2009 2009 Sng/19 Kulwinder PRWSS/ 08-JUN- Contracto 19-May- 28-May- 08-Jun- 740 Services/ A Rampur Gujran 0.15 NS N/A 08-JUN-2009 N/A 2009/0.15/ 96 r Ambala 0.14 2009 2009 2009 Sng/19 INR Cantt. / 0 / Indian PRWSS/ SHOPPI 04-Jan- 11-Jan- 20-01- 31-Mar- 741 Services/ P Nukkad natak 0.05 N/A 12-JAN-2010 N/A N/A N/A N/A N/A NG 2010 2010 2010 2011 Sng/2 Page 95 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ 12-JAN- Naresh 04-Jan- 11-Jan- 31-Dec- 742 Services/ A Nukkad natak 0.06 NS N/A 12-JAN-2010 N/A 2010/0.06/ 53 Kumar / 0 0.06 2010 2010 2010 Sng/2 INR / Indian PRWSS/ SHOPPI 19-May- 28-May- 08-06- 08-Jun- 743 Services/ P Lakhmirwala 0.25 N/A 08-JUN-2009 N/A N/A N/A N/A N/A NG 2009 2009 2009 2009 Sng/20 Kulwinder PRWSS/ 08-JUN- Contracto 19-May- 28-May- 08-Jun- 744 Services/ A Lakhmirwala 0.25 NS N/A 08-JUN-2009 N/A 2009/0.25/ 97 r Ambala 0.23 2009 2009 2009 Sng/20 INR Cantt. / 0 / Indian PRWSS/ SHOPPI 13-Feb- 24-Feb- 02-03- 02-Mar- 745 Services/ P Badrukhan 1.00 N/A 02-MAR-2009 N/A N/A N/A N/A N/A NG 2009 2009 2009 2009 Sng/21 Kulwinder PRWSS/ 02-MAR- Contracto 13-Feb- 24-Feb- 02-Mar- 746 Services/ A Badrukhan 1.00 NS N/A 02-MAR-2009 N/A 2009/1.00/ 85 r Ambala 1.00 2009 2009 2009 Sng/21 INR Cantt. / 0 / Indian PRWSS/ SHOPPI 14-Feb- 25-Feb- 02-03- 02-Mar- 747 Services/ P Qilla Bharian 0.35 N/A 27-FEB-2009 N/A N/A N/A N/A N/A NG 2009 2009 2009 2009 Sng/22 Kulwinder PRWSS/ 27-FEB- Contracto 14-Feb- 25-Feb- 02-Mar- 748 Services/ A Qilla Bharian 0.35 NS N/A 27-FEB-2009 N/A 2009/0.35/ 91 r Ambala 0.34 2009 2009 2009 Sng/22 INR Cantt. / 0 / Indian PRWSS/ SHOPPI 14-Feb- 25-Feb- 02-03- 02-Mar- 749 Services/ P Gobindgarh jejian 0.43 N/A 27-FEB-2009 N/A N/A N/A N/A N/A NG 2009 2009 2009 2009 Sng/23 Kulwinder PRWSS/ 27-FEB- Contracto 14-Feb- 25-Feb- 02-Mar- 750 Services/ A Gobindgarh jejian 0.43 NS N/A 27-FEB-2009 N/A 2009/0.43/ 92 r Ambala 0.41 2009 2009 2009 Sng/23 INR Cantt. / 0 / Indian Page 96 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS/ SHOPPI 28-Apr- 12-May- 20-06- 20-Jun- 751 Services/ P Biggarwal 0.50 N/A 20-JUN-2006 N/A N/A N/A N/A N/A NG 2006 2006 2006 2006 Sng/24 Jatinder PRWSS/ 13-JUN- 28-Apr- 12-May- Singh 13-Jun- 752 Services/ A Biggarwal 0.50 NS N/A 13-JUN-2006 N/A 2006/0.50/ 13 0.47 2006 2006 Ambala / 2006 Sng/24 INR 0 / Indian PRWSS/ SHOPPI 28-Apr- 12-May- 20-06- 20-Jun- 753 Services/ P Ghorenab 0.50 N/A 20-JUN-2006 N/A N/A N/A N/A N/A NG 2006 2006 2006 2006 Sng/25 Jatinder PRWSS/ 13-JUN- 28-Apr- 12-May- Singh 13-Jun- 754 Services/ A Ghorenab 0.50 NS N/A 13-JUN-2006 N/A 2006/0.50/ 18 0.47 2006 2006 Ambala / 2006 Sng/25 INR 0 / Indian PRWSS/ SHOPPI 16-Dec- 24-Dec- 24-12- 31-Mar- 755 Services/ P Wall Writing 0.61 N/A 24-DEC-2009 N/A N/A N/A N/A N/A NG 2009 2009 2009 2010 Sng/3 PRWSS/ 24-DEC- Naresh 16-Dec- 24-Dec- 08-Feb- 756 Services/ A Wall Writing 0.61 NS N/A 24-DEC-2009 N/A 2009/0.61/ 1429 Kumar / 0 0.54 2009 2009 2010 Sng/3 INR / Indian PRWSS/ SHOPPI 16-Nov- 26-Nov- 27-11- 30-Nov- 757 Services/ P Puppet show 0.17 N/A 30-NOV-2009 N/A N/A N/A N/A N/A NG 2009 2009 2009 2009 Sng/6 Badri PRWSS/ 27-NOV- Bhutt, 16-Nov- 26-Nov- 27-Nov- 758 Services/ A Puppet show 0.17 NS N/A 27-NOV-2009 N/A 2009/0.17/ 1365 Chandiga 0.17 2009 2009 2009 Sng/6 INR rh / 0 / Indian PRWSS/ SHOPPI 08-Feb- 18-Feb- 17-03- 17-Mar- 759 Services/ P Duggan 0.65 N/A 17-MAR-2009 N/A N/A N/A N/A N/A NG 2008 2008 2009 2009 Sng/8 Page 97 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012 Contract Contarct WBR incurred to date (in case of prior Estimated cost contract award Bids Preparation of Completion of bid Document review) (Date) review) (Date) Document (in Procurement case of prior Contract No. Package No. Expenditure objection to Plan/Actual Award signed No. (in Contractor Method of Banks no Banks no objection (RS lacs) Contract (In Lacs) Name of bidding Date of decided (Date/Val case of (Date) Opened on Sr. Description of Invitation Date ue/Curre prior (Date) (Date) No. Services ncy) review) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Kulwinder PRWSS/ 17-MAR- Contracto 20-Feb- 28-Feb- 17-Mar- 760 Services/ A Duggan 0.65 NS N/A 17-MAR-2009 N/A 2009/0.65/ 88 r Ambala 0.62 2009 2009 2009 Sng/8 INR Cantt. / 0 / Indian PRWSS/ SHOPPI 08-Feb- 18-Feb- 07-03- 07-Mar- 761 Services/ P Munshiwala 0.22 N/A 07-MAR-2008 N/A N/A N/A N/A N/A NG 2008 2008 2008 2009 Sng/9 Kulwinder PRWSS/ 07-MAR- Contracto 08-Feb- 18-Feb- 07-Mar- 762 Services/ A Munshiwala 0.22 NS N/A 07-MAR-2008 N/A 2008/0.22/ 34 r Ambala 0.20 2008 2008 2009 Sng/9 INR Cantt. / 0 / Indian Grand Total: 382 859.47 202.67 Page 98 of 98 Procurement Plan For Services/ Non-Consultancy 16/11/2012