RP1553 THE UNITED REPUBLIC OF TANZANIA MINISTRY OF TRANSPORT PROPOSED TANZANIA INTERMODAL AND RAIL DEVELOPMENT PROJECT (TIRP) REHABILITATION OF RAILWAY LINE INCLUDING TRACK RENEWAL AND BRIDGES UPGRADING BETWEEN DAR ES SALAAM AND ISAKA ALONG THE CORE CORRIDOR TO MWANZA RESETTLEMENT POLICY FRAMEWORK (RPF) Prepared by Juma Kayonko, MSc P.O. Box 30, Dar es Salaam, Tanzania Mobile: (+255) 0787/0754 616 700 Email: kayonkoj@gmail.com JANUARY 2014 TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................................................1 ABBREVIATIONS AND ACRONYMS ....................................................................................................................4 1. BASIC INFORMATION ...................................................................................................................................5 2. OBJECTIVES OF THE RPF ............................................................................................................................ 6 3. PROJECT DESCRIPTION AND RATIONALE FOR RPF ..........................................................................7 3.1 BACKGROUND ..................................................................................................................................................7 3.2 PROJECT COMPONENTS ....................................................................................................................................8 3.3 SOCIO-ECONOMIC AND SOCIO-CULTURAL ENVIRONMENT OF THE PROJECT AREA ......................................... 10 3.4 RESETTLEMENTS IMPACTS ............................................................................................................................. 12 4. LEGAL AND INSTITUTIONAL FRAMEWORK ...................................................................................... 14 4.1 INTRODUCTION .............................................................................................................................................. 14 4.2 OVERVIEW ..................................................................................................................................................... 14 4.3 PROPERTY AND LAND RIGHTS IN TANZANIA .................................................................................................. 15 4.4 ACQUISITION AND VALUATION OF LAND AND OTHER ASSETS ...................................................................... 17 4.5 COMPENSATION ............................................................................................................................................. 20 4.6 DISPUTE RESOLUTION AND GRIEVANCE MECHANISMS .................................................................................. 24 4.7 COMPARISON TO WORLD BANK OP 4.12 ....................................................................................................... 24 5. COMPENSATION FOR LAND AND OTHER ASSETS ............................................................................ 32 5.1 INTRODUCTION .............................................................................................................................................. 32 5.2 PROJECT ACTIVITIES WITH POTENTIAL RESETTLEMENT IMPACTS.................................................................. 32 5.3 SCREENING .................................................................................................................................................... 33 5.4 RAP PREPARATION ........................................................................................................................................ 34 6. IMPLEMENTATION SCHEDULE AND COSTS ....................................................................................... 43 6.1 INTRODUCTION .............................................................................................................................................. 43 6.2 INSTITUTIONAL ARRANGEMENTS FOR RPF IMPLEMENTATION ...................................................................... 43 6.3 INDICATIVE OUTLINE OF RAP BUDGET ......................................................................................................... 44 7. PUBLIC CONSULTATION AND DISCLOSURE PLAN ........................................................................... 47 7.1 INTRODUCTION .............................................................................................................................................. 47 7.2 DATA COLLECTING PHASE ............................................................................................................................. 47 7.3 IMPLEMENTATION PHASE ............................................................................................................................... 47 7.4 MONITORING AND EVALUATION PHASE......................................................................................................... 47 8. GRIEVANCE REDRESS MECHANISM ..................................................................................................... 49 8.1 INTRODUCTION .............................................................................................................................................. 49 8.2 GRIEVANCE REDRESS COMMITTEE ................................................................................................................ 49 8.3 GRIEVANCE MECHANISM PROCEDURES ......................................................................................................... 49 9. MONITORING AND EVALUATION OF IMPACTS ................................................................................. 51 9.1 INTRODUCTION .............................................................................................................................................. 51 9.2 ESTABLISHMENT OF REPORTING SYSTEM ...................................................................................................... 51 9.3 ANNUAL AUDIT ............................................................................................................................................. 53 9.4 SOCIO-ECONOMIC ASSESSMENT .................................................................................................................... 53 LIST OF ANNEXES ................................................................................................................................................. 54 ANNEX 1: WORLD BANK RESETTLEMENT POLICY ................................................................................................... 55 ANNEX 2: ANNOTATED OUTLINE FOR PREPARING A RESETTLEMENT ACTION PLAN (RAP) .................................... 57 ANNEX 3: SAMPLE GRIEVANCE AND RESOLUTION FORM ........................................................................................ 62 Page 1 of 88 ANNEX 4: SAMPLE TABLE OF CONTENTS FOR CONSULTATION REPORTS................................................................. 63 ANNEX 5: GLOSSARY OF TERMS .............................................................................................................................. 64 ANNEX 6: RELEVANT TANZANIAN LAWS ................................................................................................................ 66 ANNEX 7: SUMMARY OF STAKEHOLDER’S COMMENTS, CONCERNS AND RECOMMENDATIONS ............................... 68 ANNEX 8: LIST OF STAKEHOLDERS CONSULTED: MDAS.......................................................................................... 72 ANNEX 9: LIST OF STAKEHOLDERS CONSULTED: LOCAL GOVERNMENT AUTHORITIES............................................ 72 ANNEX 10: LIST OF STAKEHOLDERS CONSULTED: RAILWAY SIDE COMMUNITIES ................................................... 74 ANNEX 11: LIST OF STAKEHOLDERS CONSULTED: CIVIL SOCIETY ORGANIZATIONS ................................................ 84 ANNEX 12: LIST OF STAKEHOLDERS CONSULTED: TRL WORKERS .......................................................................... 84 ANNEX 13: LIST OF STAKEHOLDERS CONSULTED: RAHCO MANAGEMENT ............................................................ 87 Page 2 of 88 LIST OF TABLES AND FIGURES Table 1: Estimated number of encroachers that may occur before commencing of actual rehabilitation works under TIRP ................................................................................................... 13 Table 2: Comparison of Tanzanian and WB Policy on Resettlement and Compensation............ 25 Table 3: Entitlement Matrix .......................................................................................................... 36 Table 4: Indicative Outline of RAP Budget .................................................................................. 44 Table 5: Provisional resettlement and compensation budget for encroachment that may occur before start of rehabilitation works under TIRP ........................................................................... 46 Table 6: Indicators of ARAP/ RAP Impacts ................................................................................. 52 Figure 1: Grievance Redress Mechanism Flow Chart .................................................................. 50 Page 3 of 88 ABBREVIATIONS AND ACRONYMS ARAP Abbreviated Resettlement Action Plan CBOs Community Based Organizations DED District Executive Director DPs Displaced Persons DRC Democratic Republic of Congo ESIA Environmental and Social Impact Assessment GDP Gross Domestic Product GRM Grievance Redress Mechanism HIV/AIDS Human Immunodeficiency Virus/ Acquired Immunodeficiency Syndrome IDA International Development Association NGO Non Governmental Organization OP Operation Policy PAPs Project Affected Persons PIU Project Implementation Unit RAHCO Reli Assets Holding Company RAP Resettlement Action Plan RoW Right of Way RPF Resettlement Policy Framework STDs Sexually Transmitted Diseases SUMATRA Surface and Marine Transport Regulatory Authority TANROADS Tanzania National Roads Agency TIRP Tanzania Intermodal and Rail Development Project TRC Tanzania Railway Corporation TRL Tanzania Railway Limited USD United States Dollars WB World Bank Page 4 of 88 1. BASIC INFORMATION 1. Country and Project Name: The United Republic of Tanzania - Proposed Tanzania Intermodal and Rail Development Project (TIRP) 2. Project Development Objectives: “To strengthen logistics capacity and develop the inter- modal and railway container operations on the Dar es Salaam – Isaka corridor section in Tanzania”. This will facilitate trade, economic productivity and efficiency, and global competitiveness of rail related operations in Tanzania. This will be achieved through establishment of core train operations between Dar es Salaam and Isaka, providing reliable and efficient intermodal services supported by an associated management entity. 3. Project Outcomes: (i) Reliability of direct block train operation between Dar Port and Isaka terminal; (ii) Regularity of direct block train operation between Dar Port and Isaka terminal; (iii) Improved capacity of container trains between Dar Port and Isaka terminal (fleet utilization ratio); and (iv) Efficiency of logistics operations i.e. (i) improved loading-unloading time of train in 2 terminals and (ii) containers dwelling time on 2 terminals. 4. Expected Project Benefits: (i) The proposed project will create employment for many people during the construction phase; (ii) Reliable and efficient railway services; (iii) Reduced travel time and costs; (iv) Increased economic growth: Improving the railway services will increase and spark and promote economic growth in Tanzania and neighboring countries of Burundi, Rwanda and Democratic Republic of Congo (DRC); (v) Improve access to social services; (vi) Increased land value: improved railway services will increase land value in the impact areas and modify its use and occupation patterns along the central railway line. The project area could be attractive to big investors; and (vii) The project will increase the life span of trunk roads as improved railway services could discourage many traders from using road transport. . 5. Identified Project Social Risks: (i) Risk of accidents and injuries to workers (ii) Risk of accidents to people and livestock (iii) Risk of increased STDs etc. Responsible Government/Country Agency for RPF Implementation: Rail Assets Holding Company (RAHCO) in collaboration with Tanzania Railway Limited (TRL). Total Project Cost (USD million): The proposed World Bank financing for the proposed TIRP amounts to a US$200 million International Development Association (IDA) credit. Name/Contacts of Consultant/Consulting Firm who prepared RPF: Kayonko Juma Kayonko, Tanzania; e-mail: kayonkoj@gmail.com; Mobile: +255 754/787 616 700 Date RPF Prepared: January 2014 Date RPF Disclosed: Page 5 of 88 2. OBJECTIVES OF THE RPF The objectives of the Resettlement Policy Framework (RPF) are to:  Establish the TIRP resettlement and compensation principles and implementation arrangements;  Describe the legal and institutional framework underlying Tanzanian approaches for resettlement, compensation and rehabilitation;  Define the eligibility criteria for identification of project affected persons (PAPs) and entitlements;  Describe the consultation procedures and participatory approaches involving PAPs and other key stakeholders; and  Provide procedures for filing grievances and resolving disputes. The RPF will apply to activities/investments envisioned under Component A: Improvement of Rail Infrastructure and Component C: Development of Isaka Terminal and Dar es Salaam Port Platform. The procedures will be carried out throughout preparation and implementation, and impacts of any potential resettlement will be included in monitoring and evaluation (M&E). When a Resettlement Action Plan (RAP) is required, it will be prepared in accordance with guidance provided in this RPF, including Detailed Measurement Surveys, Identification (Census) of PAPs/displaced persons, and Public Consultation and Disclosure Procedures (PCDP). The RPF follows the Tanzania Laws and the guidance provided in the World Bank Operational Policy on Involuntary Resettlement (OP4.12), as described in Annex 1. The RPF ensures that any possible adverse impacts of proposed project activities are addressed through appropriate mitigation measures, in particular, against potential impoverishment risks. These risks can be minimized by:  Avoiding displacement of people without a well designed compensation and relocation process;  Minimizing the number of project affected persons (PAPs), to the extent possible;  Compensating for losses incurred and displaced incomes and livelihoods; and  Ensuring resettlement assistance or rehabilitation, as needed, to address impacts on PAPs livelihoods and their well being. Page 6 of 88 3. PROJECT DESCRIPTION AND RATIONALE FOR RPF 3.1 Background In December 2010, the Ministry of Transport, Ministry of Finance, and the World Bank (WB) sent out a fact-finding mission to assess the current status of the rail sector and map out the WB engagement for its revitalization. The Mission found that there was a compelling business case to finance improvements in the central line, but that a more outward looking approach would be needed. In this regard and among other things, the mission also identified the need for RAHCO to work closely with Tanzania Ports Authority (TPA) (and possibly the major shipping lines) to increase reliability and efficiency. Accordingly, the WB support will be based on a compelling and well defined strategy with improved management and operational performance. While RAHCO would continue to manage the rail infrastructure, the strategy may include an open track approach allowing qualified operators to run trains on the network under the safety regulations of Surface and Marine Transport Regulatory Authority (SUMATRA). To achieve this, the WB also identified the need for a multi-phased programme – the first phase focusing on immediate repairs to tracks and other improvements needed to guarantee freight services between Dar es Salaam and Isaka. Specifically, it is envisaged that the first phase will consist of: (i) 90 km of track improvements between Dar es Salaam and Isaka; (ii) Re-design and upgrading of rail exchanges on the port and particularly in and around the two container depots in the port of Dar es Salaam and the Isaka terminal; (iii)Procurement of essential spares for selected locomotives and track-laying equipment; and (iv) Improvements at key nodes (Dar es Salaam and Isaka). This document presents a Resettlement Policy Framework (RPF) for the proposed Tanzania Intermodal and Rail Development Project (TIRP). It is one of the documents required for the approval of the Executive Directors of the World Bank to provide financing in an amount of US$200 million to the United Republic of Tanzania for the TIRP. Why an RPF? Depending on the status of completion of the detailed design and on the outcomes thereof, Resettlement Action Plan (RAP) will be prepared, consulted upon, and disclosed. Since the detailed design is not yet completed, this RPF has been prepared and will be disclosed in the web sites of all agencies involved, in all the districts and municipalities that are affected, and at the World Bank’s Infoshop in Washington D.C by the appraisal. Page 7 of 88 3.2 Project Components The main elements that have been identified as being critical to improving train operations on the existing network are: (a) the condition of rail infrastructure, (b) the availability and reliability of rolling stock, (c) the strengthening of the components of the logistics chain, starting at the port (long customs clearance processes, long operating delays and insufficient inter-modal facilities), and finally (d) the capacity of the existing organizations in the rail sector to deliver a strong business model and efficient management. These elements have been reflected into the following project components. Component A: Improvement of Rail Infrastructure (US$154.61 million) This component includes the rehabilitation of key sections of the railway track and other infrastructure improvements to guarantee a reliable service between Dar es Salam Port and Isaka Terminal. This will include the following main activities: (a) The rehabilitation of some railway track sections requiring urgent repairs on the 970 km long Dar es Salaam - Isaka line (US$81.51 million). The Project would conduct full depth rehabilitation of 90 km of the railway line, replenishment of ballast for 300 km, and re-ballast in stations sections for 25 km. The project would further rehabilitate 150 turn outs and station loops, conduct rock cutting and stabilization of slopes at 15 locations, construct grade separation of four rail/road intersections, and welding rail joints for 330 km. (b) The rehabilitation of “weak” bridges to increase the capacity to minimum of 15 tons/axle load (US$73.10 million). The Project would reconstruct or repair 152 bridge structures to increase the axle load capacity of the Isaka – Dar es Salaam section to a minimum of 15 tons. The detailed activities to be done for each bridge would be confirmed after finalization of the bridge capacity rating study that is being financed by the Project. The bridges with axle load capacity of less than 15 tons would be upgraded to 25 tons axle load capacity, building up further the track capacity for 100 ton locomotives. Component B: Rolling Stock (USD25.6 million) Component B includes procurement of train set(s) to deliver a new inter-modal service of block container trains between the Dar es Salaam Port and Isaka Terminal at the level defined in the key results indicators of the project. Although this rolling stock would be dedicated to this new inter-modal service, the improvement in TRL’s traction capacity together with track Page 8 of 88 improvements under Component A would have a positive impact on operation of other already existing services on the Dar es Salaam - Isaka rail segment. It will include the following: (a) The purchase of 3 locomotives (US$7.2 million); (b) The purchase of wagons (US$4.4 million) - the block train services will require 44 wagons (assuming 90 percent availability) for a two train weekly service; and (c) The purchase of Civil Engineering Rolling stock (US$14 million): the project would purchase a new tamper and a regulator, one rail grinding machine and one mobile flash butt welder (rail or road/rail). Component C: Development of Isaka Terminal and Dar es Salaam Port Platform (US$8.29 million) This component comprises the development of intermodal container terminals in the port of Dar es Salaam and Isaka to allow for more efficient modal transfers to/from the rail. (a) The design and civil works to construct rail exchanges in the Terminal in Isaka (US$4.18 million). The existing Isaka terminal would be relayed and the terminal platform would also be improved to be able to efficiently handle the 40 container locomotive. The project would finance the design, the works, and handling equipment; and (b) The design and implementation of civil works to upgrade rail exchanges in Dar es Salaam Port particularly in and around the container depots in the port (US$4.10 million). The existing railway network within the port will be realigned to improve the efficiency of the loading and offloading of containers. The project would finance the design study, the realignment works, and handling equipment to enable optimal operation as an intermodal terminal. Component D: Institutional Strengthening and Capacity Building (US$11.5 million) Efficient railway organizations are an essential factor of the long term sustainability of the project and a key element for its appraisal. Building on lessons learned, this component would create the proper environment for operation of a new block train. It would cover the following areas: (a) Ensure the economic sustainability of the infrastructure by implementing open access, promote business, increase and through the access fee mechanism, build the required resources for maintaining the infrastructure; (b) Allocating funding for maintenance organization and sustainability by establishing a performance based contract for the maintenance of the railway infrastructure; and (c) Building modern, efficient and profitable train operations model through capacity building program, communication and with the assistance and support of the Project Implementation Team. Page 9 of 88 3.3 Socio-economic and Socio-cultural Environment of the Project Area 3.3.1 Main Economic Activities The main economic activities found in communities living along the railway line are agriculture and livestock keeping. Other economic activities are small commercial activities such as petty trading, etc. Agriculture is the main economic activity and most of the people in communities living adjacent to the railway line engage in farming for both subsistence and cash crops, where the major food crops are paddy, maize, beans, cassava, sweet potatoes, vegetables, fruit and bananas. The major cash crops are sisal, sugar cane, rice, maize, simsim and sunflower. However, crops like rice, maize and beans can fall into both categories. Maize is the chief food crop for most of the local communities. Livestock keeping is another economic activity undertaken in the villages along the railway line. It includes keeping cattle, goats, sheep, pigs and poultry. Grazing is the major type of livestock keeping system used by livestock keepers, which in turn has social and environmental consequences. Zero grazing is minimally practiced by village communities along the railway line, such as Kilosa and Kimamba. In recent years, the number of livestock, especially dairy cattle, has increased. However, free grazing is the most serious problem for cattle keepers. 3.3.2 Land Use The existing land use along the railway line is primarily agriculture, grazing, forest reserves, human settlement and stone quarry. Overgrazing and poor cultivation methods close to the railway line have resulted in land degradation, particularly soil erosion, near the railway line. Grazing along the railway has contributed to degradation of the top soil, and the removal of natural vegetation cover, promoting soil erosion, with cattle crossing the railway line. In cities and small towns there have been great changes in land use, especially on the periphery of the towns affecting the railway reserve. Rapid growth of cities and towns results in serious encroachment on the railway reserve, since there are no clear boundaries where the 15m railway reserve ends and the 30m railway reserve starts as you move out of the cities or towns. Due to delays in the implementation of redevelopment plans, the transition of agricultural/grazing/forest areas into human settlement areas on the periphery of cities and towns increases the problem of encroachment within 15/30m. Also the lack of proper infrastructure and special crossings for cattle affect railway structures at the crossings. This contributes to degradation of the railway infrastructure. 3.3.3 Ongoing and Planned Development Activities There are a number of planned activities along the railway line but of more concern are those which interfere with railway operations and which may affect the future railway development plans and operation. TANROADS is upgrading the Manyoni-Itigi road to bitumen standard. The PSI&ES Report (Hanai, 2011) noted that the project needed a clear consensus between TANROADS and TRL since road runs parallel and close to the railway line, intruding into the railway line reserve. TANROADS was consulted during the preparation of the PSI&ES Report (Hanai, 2011) as a result; the road was shifted away from the railway reserve. More complicated situation was observed in Dodoma Municipality where the Capital Development Authority (CDA) has made several town plans that has created some latent land issues between CDA and RAHCO/TRL. Page 10 of 88 3.3.4 Gender Issues and HIV/AIDS Both men and women derive various benefits from the railway service, such as small businesses at train stations. A good example exists at Itigi, Manyoni, Saranda and Kilosa etc, where a number of people engage in various activities to make a living by vending. On the other hand there are also disadvantages due to the availability of this transport, as it stimulates charcoal making, thus increasing degradation, illegal wood selling due to the market for it, and the spread of HIV due to increased social interaction. Nevertheless, there are more benefits than negative impacts. Therefore, it is important to provide sensitization and create awareness among TRL staff at railway stations and railway side local communities on HIV/AIDS issues. This will increase community involvement and empowerment in order to prevent the spread of HIV Infections, and to provide care and support for those infected and other vulnerable groups. 3.3.5 Cultural/Historic Properties No documented physical cultural properties (PCPs) were observed along the railway line. However, in Dodoma there is a graveyard located close to the railway line but outside the 15m railway reserve. It was noted during field work that the graveyard is almost full, so encroachment in the reserve is likely to occur in the near future. Due to the proximity to the railway reserve and in order to avoid future expansion in the reserve, the use of this graveyard should be closely monitored. Since the project is envisaged to involve some significant earthworks, there could be possibility for chance finds of PCRs during project implementation. Chance finds procedures (CFP) have been recommended, consistent with World Bank’s OP/BP 4.11 and Tanzanian laws. 3.3.6 Transportation and Communication The central railway line is a prominent transport system that serves the central part of Tanzania. It has a main station at Morogoro and a central railway workshop that makes it a special focus of railway communication in the country. Another workshop exists in Tabora, where there is a junction for the railway going to Kigoma and Katavi Regions. The Tabora workshop is smaller than the Morogoro one. There are dependable postal and digital telecommunication services all along the CRL. A landline telephone system provided by the National provider, Tanzania Telecommunication Company Limited (TTCL) is main one. Mobile phones are also used for communication where necessary. The mobile telecommunication companies providing communication services in Tanzania and used by railway staff and the communities adjacent to CRL are VODACOM [TZ], Airtel, Tigo and Zantel. 3.3.7 Access to Social Services within Railway Stations by Local Communities There are a numerous social services that railway side communities benefit or accrue from the railway stations along the line. These services include water, communication network and electricity. Although their current state is not as it used to be in the past, all the railway stations were supplied with necessary social services in which communities share and benefit from them. For example most of stations were supplied with water for railway staff and activities. However, due to poor access to water in most of surrounding communities they also depend on water services from these railway stations. On the other hand there is an important connecting link provided by the railways gangs distributed along the line which also form part of the social network along the line. Page 11 of 88 3.3.8 Social Network along the Railway Line The existing railway line has significantly contributed to formation of social network that is important for communities living along the railway line. The availability of social services, commercial activities, and transport services provided within railway stations and the railways gangs promotes social networks and social capital. Railway staff living in these stations and gangs has become part and parcel of the local communities surrounding them and participate in various social events. There are some of retired staff who have become residents within communities living along the railway line. 3.3.9 Security and Safety Issues along the Railway Line There are number of cases where vandalism of some properties in railway stations and gangs has been taking place. This is attributed by inadequate number of gangs along the line. Previously, before privatization to RITES Ltd there were railway gangs at an average interval of about 10km for cleaning and inspecting the railway line. After privatization some of the gangs and stations were closed, reducing the number of staff and inspection frequencies. The remaining staff did not have enough capacity to monitor safety and security along the line; hence vandalism of properties became common. These were important for checking safety and security issues along the railway line. The proposed rehabilitation project will provide an opportunity to inform and educate young populations along the line, and enforce a positive attitude regarding basic safety issues and combat vandalism. 3.4 Resettlements Impacts Of the four components described in the previous section, component A (a) on “The rehabilitation of some railway track sections requiring urgent repairs on the 970 km long Dar es Salaam - Isaka line (US$81.51 million)” and component C “Development of Isaka Terminal and Dar es Salaam Port Platform” have the potential for resettlement impacts as under this sub- component, the Project would conduct full depth rehabilitation of 90 km of the railway line, replenishment of ballast for 300 km, and re-ballast in stations sections for 25 km. The resettlement impact is considered potential because there are no clear boundaries where the railway reserve ends such that there has been some encroachment onto the railway right of way both in rural and urban areas. To avoid or minimize impact, for the proposed rehabilitation works, RAHCO only considers 7.5 meters as the construction corridors and will not include the entire right of way of 15 and 30 meters in rural and urban areas respectively. This means only those within the 7.5 meters construction corridors would be affected. An Environmental and Social Impact Assessment (ESIA) study has confirmed that within the diameter of 7.5 meters of railway reserve, all along from Dar es Salaam to Isaka, it is likely that the number of encroachers with fixed properties and assets is overall very minimum but might need a separate verification assessment especially in urban areas and around main railway stations where there is heavy encroachment within 15 meters of the railway reserve. In the Page 12 of 88 country side or rural areas where the legal railway reserve is 30 meters, the main form of encroachment is through cropping of seasonal crops such as maize, rice, vegetables etc. According to Civil Engineering Manual (TRC, 1998), cultivation within the railway reserve by outside parties (non-railway employees) is not permitted. The table below indicates provisional number of encroachers within the construction corridor that may occur before commencement of rehabilitation works under TIRP as provided by RAHCO. Table 1: Estimated number of encroachers that may occur before commencing of actual rehabilitation works under TIRP Location Fixed Seasonal crops Kiosks and other vendors with properties temporary structures etc 1. Dar es Salaam-Morogoro Down 1 4 8 Signal segment 2. Morogoro Down Signal to- 2 3 3 Dodoma Down Signal segment 3. Dodoma Down Signal-Tabora 0 5 4 Down Signal segment 4. Tabora Down Signal –Isaka 0 2 3 Signal segment Total 3 14 18 Assumed Provision in an Properties invent there will Vendors that may come with that may be some seasonal Remarks construction corridor before occur before crops not start of works start of site harvested when as works project commence Source: RAHCO The exact impact at this point is not known and will be only known upon completion of the detail design. According to World Bank’s policy on Involuntary Resettlement (OP 4.12), the follow-up instrument to an RPF is a RAP. In this case, any RAP will likely cover a small number of Project-Affected People (PAPs). Evidence of presence of PAPs was uncovered during stakeholder’s consultations done as part of the ESIA study. Annex 7 contains stakeholder’s comments, concerns and recommendations specifically for resettlement related issues. Names and signatures of people consulted at different institutions/ stakeholders are listed in Annex 8-13. Page 13 of 88 4. LEGAL AND INSTITUTIONAL FRAMEWORK 4.1 Introduction This RPF will apply the laws, legislation, regulations, and local rules governing the use of land and other assets in Tanzania. This legal and institutional framework is presented in five sections: (i) Political economy and governance in Tanzania; (ii) Property and land rights, as defined by Tanzanian law and customary practice; (iii) Acquisition of land and other assets, including regulations over the buying and selling of these assets; (iv) Rights and compensation, in particular, the accepted norms influencing peoples’ basic rights to livelihood and social services; (v) Dispute resolution and grievance mechanisms, specifically the legal and institutional arrangements for filing grievances or complaints and how those grievances are addressed through formal and informal systems of dispute resolution; and (vi) Comparison with World Bank OP4.12, using equivalence and acceptability standards. 4.2 Overview Tanzania is made up of two formerly independent countries which united in 1964. Tanzania Mainland and Zanzibar have each a different set of laws and procedures related to land and property rights. Tanzania as used herein refers to the Mainland only. Tanzania is a multi-party parliamentary democracy. The country is among the poorest nations in the World, but is rapidly developing and enjoying peace and a stable macro-economic status. The country has a central government, regional administrations and local governments. There are 21 regions, 117 rural and urban authorities and 12,500 Villages. Tanzania has an area of 945087 km2 and a population of over 40 million growing at around 2.5% p.a. with rapid urbanization taking place. Around 30% of the population is urban. Over 80% of the population depends on agriculture, but only 2% of rural land and 20% of urban land is registered. Poverty is still rampant despite macro-economic gains in the past decades. The Constitution of the United Republic of Tanzania 1977 (as amended) in its preamble provides that Tanzania aims at building a democratic society founded on the principles of freedom, justice, fraternity and concord, in which the Executive is accountable to the Legislature composed of elected members and representatives of the people, and also a Judiciary which is independent and dispenses justice without fear or favour, thereby ensuring that all human rights are preserved and protected. The Constitution provides for legislative supremacy of Parliament and independence of the Judiciary. It also embraces the principles of rule of law, separation of powers and a pluralistic political system. Tanzania Vision 2025 expresses both hope and determination in ridding the country of poverty, disease and ignorance. It seeks to do so by achieving high and sustained growth at an average of Page 14 of 88 8 percent, and halving abject poverty by 2010 and eliminating it by 2025. The National Strategy for Growth and Poverty Reduction seeks to realize the goals of the Vision 2025. Rapid development has many times necessitated the taking over of land from its owners for investments such as infrastructure. There is a system of land acquisition and compensation based on law and practice, and many sectors have their own laws and regulation that address the question of involuntary resettlement. Tanzania has a set of solid policy, legal, and institutional frameworks for management of land and property acquisition and compensation. First, basic principles recognizing ownership of lands and resources is enshrined in the National Constitution, the Land Policy and Land Acts. These are further defined in local laws and by-laws. 4.3 Property and Land Rights in Tanzania The Constitution of the United Republic of Tanzania provides for the rights of citizens to own property and disallows the deprivation of one’s property held in accordance with the law, unless the owner is fairly and adequately compensated. Article 24 (1) says: Every person is entitled to own property and has a right to the protection of his property held in accordance to the law. Sub-article (2) further provides that; …..it shall be unlawful for any person to be deprived of property for the purposes of nationalization or any other purposes without the authority of the law which makes provision for fair and adequate compensation. The National Land Policy of 1995, and the Land Laws emanating from it, addresses issues of: Land tenure, promotion of equitable distribution of land access to land by all citizens; improvement of land delivery systems; fair and prompt compensation when land rights are taken over or interfered with by the government; promotion of sound land information management; recognition of rights in unplanned areas; establishment of cost effective mechanisms of land survey and housing for low income families; improvement of efficiency in land management and administration and land disputes resolution, and protection of land resources from degradation for sustainable development Among the fundamentals of land policy which the Land laws seek to implement are the following: Page 15 of 88 (a) To recognize that all land in Tanzania is public land vested in the President as a trustee on behalf of all citizens; (b) To ensure that existing rights in and recognized long standing occupation or use of land are clarified and secured by the law, and, (c) To pay full, fair and prompt compensation to any person whose right of occupancy or recognized long-standing occupation or customary use of land is revoked or otherwise interfered with to their detriment by the State under this Act or is acquired under the Land Acquisition Act, 1967 The Land Act and Village Land Act create three categories of land namely General Land, Village Land and Reserved Land. Besides, there is a category of hazard land. General land is described as consisting of all land which is neither village land nor reserved land. All urban land falls under this category, except land which is covered by laws constituting reserved land, or that which is considered hazard land. General land is governed by the Land Act and, hence, is under the control and jurisdiction of the Commissioner for Lands. This ministerial key person has delegated much of the powers to local government land officers. Property rights can be created over general land in terms of a granted Rights of Occupancy for a period of 33, 66 or 99 years confirmed by a Certificate of Title. Longstanding occupation of land except on government land) is recognized as conferring property rights. In the case of land acquisition all occupiers of land irrespective of whether they have a granted right of occupancy or not, are eligible to compensation. Granted rights of occupancy carry conditions including land development and the payment of land rent. Failure to abide with these conditions can lead to the loss of the right. Village land is defined as being the land falling under the jurisdiction and management of a registered village. As Tanzania consists of a vast countryside with only a few urban areas, most land in the country is village land. Each village is required to define three land-use categories within its own borders: 1) communal village land, 2) individual and family land, 3) reserved land (for future village expansion). Village and is held under customary tenure and the government can issue customary certificates of tenure to individuals or communities where the village is surveyed and has a Certificate of Village Land. Customary tenure is akin to freehold. Reserved land is defined as land being reserved and governed for purposes subject to nine listed laws. It includes: environmental protection areas, such as national parks, forest reserves, wildlife reserves, and marine parks as well as areas intended and set aside for spatial planning and (future) infrastructure development. Page 16 of 88 The Commissioner for Lands can convert land from one category to the other. By far the majority of land occupiers have no certificates of title, in part because land has to be surveyed before it can be issued with a title. However, there is a lot of “de facto” recognition of property rights for the majority of land occupiers. The National Land Policy (1996) of Tanzania provides guidance and directives on land ownership and tenure rights and taking of land and other land based assets. The policy stipulates organization and procedures for valuing assets and delivery of compensation. The overall aim of the policy is to promote and ensure a secure land tenure system in Tanzania that protects the rights in land and resources for all its citizens. The following principles are the basis of the land policy:  All land in Tanzania is public land vested in the President as trustee on behalf of all citizen;  Land has value;  The rights and interest of citizens in land shall not be taken without due process of law; and  Full, fair and prompt compensation shall be paid when land is acquired. 4.4 Acquisition and Valuation of Land and Other Assets Land Acquisition The Land Acquisition Act 1967 is the principal legislation governing the compulsory acquisition of land in Tanzania. Sections 3-18 of the Land Acquisition Act 1967 empower the President to acquire land, and provide the procedures to be followed when doing so. The President is empowered to acquire land in any locality provided that such land is required for public purposes. The procedures provided by the Land Acquisition Act include: the investigation of the land to see if it is suitable for the intended purpose; notification to the landowners to inform them of the decision to acquire their land before the President takes possession; and payment of compensation to those who will be adversely affected. The law restricts compensation to un- exhausted improvements on the land excluding the land or such improvements as land clearing and fencing. This latter situation has been rectified by the Land Act 1999. If land is required for public purpose the President is required to give a six weeks notice to those with an interest in the land in question but, if the situation so demands, the notice can be shortened without the need to give explanation. After the expiration of the notice period the President is entitled to enter the land in question even before compensation is paid. Page 17 of 88 The person whose land is acquired is entitled to be compensated if they so deserve as provided for under section 11 and 12 of the Act. The persons entitled to compensation are those interested or claiming to be interested in such land; or persons entitled to sell or convey the same or as the government may find out after reasonable inquiries. The Land Act 1999 clarifies and adds certain aspects to be considered when determining the compensation package. Many other laws have provisions related to land acquisition, but they will always refer back to the Land Acquisition Act and the Land Act. Some of these laws are the Village Land Act (2004), the Roads Act 2007, Urban Planning Act 2007, Land Use Planning Act 2007, Mining Act 2010 and others1. Tanzania has a dual system of land tenure concerning public lands: (i) customary rights and (ii) statutory rights of occupancy Tenure rights to land can be held by individuals and by communities. Holdings of individuals can be covered by the following:  Leasehold right of occupancy for varying periods e.g. 33, 66, or 99 years which must be confirmed by a certificate of occupancy; and  Customary rights of occupancy that must be confirmed by a certificate of Customary Right of Occupancy (Hati ya Ardhi ya Mila) and have no term limit. Communities (Villages) are allowed to hold land and to manage it, although they do not formally own the land. Valuation The Land Acquisition Act (s.14) requires the following to be taken into account in assessing compensation (a) take into account the value of such land at the time of the publication of notice to acquire the land without regard to any improvement or work made or constructed thereon thereafter or to be made or constructed in the implementation of the purpose for which it is acquired; (b) when part only of the land belonging to any person is acquired, take into account any probable enhancement of the value of the residue of the land by reason of the proximity 1 The Constitution of the United Republic of Tanzania of 1977 (as amended), the National Land Act (No. 4 of 1999), Village Land Act (No.5 of 1999), Land Regulations 2001 Subsidiary Legislation, Land Acquisition Act (1967), Land Ordinance (1923 Cap. 113) and Town and Country Planning Ordinance (1956 Cap. 378) contain provisions related to land tenure and ownership in Tanzania. Page 18 of 88 of any improvements or works made or constructed or to be made or constructed on the part acquired; (c) take into account the damage, if any, sustained by the person having an estate or interest in the land by reason of the severance of such land from any other land or lands belonging to the same person or other injurious effect upon such other land or lands; (d) not take into account any probable enhancement in the value of the land in future; (e) not take into account the value of the land where a grant of public land has been made in lieu of the land acquired; A practice developed that since land belonged to the public, the valuation for compensation excluded the value of bare land. However, among the clarifications made in the Land Act 1999 were: (a) to take into account that an interest in land has value and that value is taken into consideration in any transaction affecting that interest; and, (b) that in assessing for compensation, the market value of the real property is taken into consideration Current practice is guided by the Land (Assessment of the Value of Land for Compensation) Regulations, 2001, and the Village Land Regulations, 2001, which provide that the basis for assessment of the value of any land and unexhausted improvement for the purposes of compensation is the market value of such land. The market value of any land and unexhausted improvement is arrived at by the use of the comparative method evidenced by actual recent sales of similar properties, or by the use of the income approach or replacement cost method, where the property is of special nature and is not readily transacted in, in the market. Assessment can only be carried out by a qualified valuer and where the government (national and local) is involved; such assessment must be verified by the Chief Valuer in the government. Tanzania laws indicate that the current market values should be used as basis for valuation of land and properties. Regulation 3 of the Land Policy (Assessment of the Value of Land for Compensation) Regulations, 2001 and Part I-lIl of the Village Land Regulations, 2002 provide for practical guidelines on assessment of compensation. The full and fair compensation is only assessed by including all components of land quality. Presently in assessing the value of the unexhausted improvements for compensation purposes, the law emphasizes that the value should be the price that which said improvements can fetch if sold in the open market. But this in normal circumstances is lower than the replacement value but higher than the initial construction cost of the said improvements. Page 19 of 88 A number of national laws have provisions requiring Environmental and Social Planning for investments that may cause adverse environmental impacts to the resource and mitigation measures for individuals affected by development activities. Agriculture and land acts provide for rights of individuals whose property may be acquired and to be compensated according to national laws. The Local Government (District Authorities) Act No. 7, 1982 and Local Government (Urban Authorities) Act No. 8, 1982 stipulate the functions of District/Urban councils. Issues of land are included as objectives of functions and therefore part of the mandates of local government in their respective areas. The prices for cash crops will be determined as the average value over the previous year, corrected for inflation. The prices for subsistence crops will be determined as the highest value over the previous year, corrected for inflation. Crop values will be determined based on a combination of staple foods and cash crops. Specifically, the 80/20 ratio of land that a farmer typically has in food crops and cash crops is used to determine the chances s/he would lose food crop rather than a cash crop income. Another way of valuing agricultural production is through the value of stable crops to be taken as the highest market price reached during the Year. This is based on three factors: (i) Although most farmers grow staple crops mainly for home consumption, they always have the option of selling these crops to take advantage of the market; (ii) Farmers most often purchase cereals when they have run out, during the "hungry season" when prices are high. Compensating at a lower value might put the individual or household at risk. (iii) Averaging the highest price of stable foods yields a high per hectare value that reimburses for the vegetables and other foods that are commonly inter-cropped with staples, but are almost impossible to measure for compensation. 4.5 Compensation The principal of paying compensation for land that is compulsorily acquired exists in both the constitution and in the relevant land laws. Article 24 sub-article (2) of the Constitution states as follows: …..it shall be unlawful for any person to be deprived of property for the purposes of nationalization or any other purposes without the authority of the law which makes provision for fair and adequate compensation. Under the land Acquisition Act, 1967, the government is required to pay compensation for the land taken. The compensation may be as agreed upon, or as determined under the Act. The government may in addition to compensation and with agreement of the person entitled to compensation pay compensation as well as give alternative land. There are situation where the government is compelled to give alternative land (eg in cases where land was used as a Page 20 of 88 cemetery) in lieu or in addition to compensation. The land granted must be of the same value and held under the same terms as the land acquired, and must be in the same local government authority area unless the person whose land is being acquired consents to be given land elsewhere. The Land Acquisition Act does not provide for compensation where land is vacant. Besides, where land is inadequately developed, compensation is to be limited to the value of unexhausted improvements of the land. However, provisions in the Land Act 1999 over-ride or clarify those in the Land Acquisition Act. In the case of compulsory acquisition, the government is required: To pay full, fair, and prompt compensation to any person whose right of occupancy or recognized long-standing occupation or customary use of land is revoked or otherwise interfered with to their detriment by the state under this Act or is acquired under the Land Acquisition Act; provided that in assessing compensation for the land acquired in the manner provided for under this Act, the concept of opportunity cost shall be based on the following: (i) Market value of the real property (ii) Transport allowance (iii) Loss of profits or accommodation (iv) Cost of acquiring or getting the subject land (v) Disturbance allowance (vi) Any other cost, loss or capital expenditure incurred to the development of the subject land; and, (vii) Interest at market rate to be charged in case of delays in payment of compensation and any other costs incurred in relation to the acquisition. The question of documented legality is not a key consideration in entitlement to compensation. In practice at least in recent days, compensation has been paid in all cases of people who claim to be landowners and who are adversely affected by the contemplated scheme. However, the definition of beneficiaries has been taken not to include tenants. The Land (Assessment of the Value of Land for Compensation) Regulations, 2001 and the Village Land Regulations, 2001, provide for the amount of compensation to include the value of unexhausted improvements, disturbance allowance, transport allowance, accommodation allowance and loss of profits. Page 21 of 88 Disturbance allowance is calculated by multiplying the value of the land by an average percentage rate of interest offered by commercial banks on fixed deposits for twelve months at the time of loss of interest in land. Transport allowance is the actual cost of transporting twelve tons of luggage by road or rail whichever is cheaper within twenty kilometers from the point of displacement Accommodation allowance is calculated by multiplying the monthly market rent for the acquired property by thirty six months. Loss of profit in the case of business carried out on the acquired property will be assessed by calculating the net monthly profit evidenced by audited accounts where necessary and applicable, and multiplied by thirty six months. Transport allowance, accommodation allowance and loss of profit do not apply where the land acquired is unoccupied at the date of loss of interest. Compensation is to be paid promptly but if it is not paid within six months it will attract an interest equal to the average percentage rate of interest offered by commercial banks on fixed deposits. In the case of agricultural land, compensation is intended to provide a farmer whose land is acquired and used for project purposes to cover the productive values of the land, labor, and crop loss. For this reason, and for transparency, "land" is defined as an area: (i) in cultivation; (ii) being prepared for cultivation; or (iii) cultivated during the last agricultural season. This definition recognizes that the biggest investment a farmer makes in producing a crop is his/her labor. A farmer works on his/her land most of the months of the year. The major input for producing a crop is not seed or fertilizer, but the significant labor put into the land each year by the farmer. As a result, compensation relating to land will cover the market price of labor invested times the amount of time spent preparing a plot equivalent to that taken. The market price of the crop lost is considered separately. The other compensation rates cover the labor cost for preparing replacement land based on a calculated value that would cost a farmer to clear and create replacement land. This value is found by adding together the average costs of clearing, plowing, sowing, weeding twice, and harvesting the crop. Labor costs will be paid in Tanzania shillings, at the prevailing market rates. All agricultural labor activities are included for two reasons. First, all land labor will be compensated at the same rate. Second, it is difficult to forecast the growing season that would Page 22 of 88 define acquisition of the land. The eventual consideration is when land compensation covers all investments that a farmer will make. In certain cases, assistance may be provided to land users in addition to compensation payments, for example, if the farmer is notified that his/her land is needed after the agriculturally critical date. Often, the timing coincides with the time when the farmer no longer has enough time to prepare another land without additional labor. Assistance will be provided in the form of labor-intensive village hire, or perhaps mechanized clearing, so that replacement land will be ready by the sowing dates. The farmer will still continue to receive his/her cash compensation so that the compensation can cover the costs for sowing, weeding and harvesting. Compensation for structures will be paid by replacing at cost, for example, huts, houses, farm outbuildings, latrines and fences. Any homes lost will be rebuilt on acquired replacement land, however cash compensation would be available as a preferred option for structures (i.e. extra buildings) lost that are not the main house or house in which someone is living. The going market prices for construction materials will be determined. Alternatively, compensation will be paid in-kind for the replacement cost without depreciation of the structure.. Compensation will be made for structures that are: (i) abandoned because of relocation or resettlement of an individual or household; and (ii) directly damaged by construction activities. Replacement values will be based on:  Drawings of individual's household and all its related structures and support services;  Average replacement costs of different types of household buildings and structures based on collection of information on the numbers and types of materials used to construct different types of structures (e.g. bricks, rafters, bundles of straw, doors etc.) For vulnerable groups identified in earlier section of this RPF replacement values will be based on actual replacement cost.  Prices of these items collected in different local markets;  Costs for transportation and delivery of these items to acquired/replacement land or building site; and  Estimates of construction of new buildings including labor required. Page 23 of 88 4.6 Dispute Resolution and Grievance Mechanisms Where there is a dispute, the government tries to reach an amicable solution through persuasion. If a solution is not found within six weeks, the Land Acquisition Act, 1967, application can be made to the High Court of Tanzania for the determination of the dispute Every suit instituted shall be governed insofar as the same may be applicable by the Civil Procedure Code and the decree of the High Court of Tanzania may be appealed against to the Court of Appeal. Since the coming into operation of the Courts (Land Disputes Settlements) Act, 2002, disputes concerning land acquisition and compensation are dealt with by the Land Division of the High Court. In the case of a dispute as to the amount to be paid, either the Minister or the person claiming compensation may refer such dispute to the Regional Commissioner for the region in which the land is situated and the decision of the Regional Commissioner shall be final. The Minister should give notice of intention to acquire the land to the persons interested or claiming to be interested in such land, or to the persons entitled to sell or convey the same. The Minister may, by notice direct the persons to yield up possession of such land after the expiration of a period of not be less than six weeks from the date of the publication of the notice in the Gazette. 4.7 Comparison to World Bank OP 4.12 Laws on land administration in Tanzania are comprehensive but differ in several ways with the World Bank’s OP 4.12 (Involuntary Resettlement) policy. For example, entitlements for payment of compensation are essentially based on the right of ownership, which limits the rights of non- formal occupants like slum dwellers and tenants which the Bank’s OP 4.12 policy recognizes. The provision that affected persons are entitled to some form of compensation whether or not they have legal title if they occupy the land by a specified cut-off date is not explicit in Tanzanian laws although in practice these are compensated. Where there is a difference between OP 4.12 and Tanzanian law, the former shall prevail. Page 24 of 88 Table 2: Comparison of Tanzanian and WB Policy on Resettlement and Compensation Types of affected Tanzanian Law World Bank OP 4.12 Comparison/Gaps Persons/Lost Assets Land Owners The Land Acquisition Act, the Land Act Displaced persons are classified There is no gap between 1999 and the Village Land Act 1999 have into three groups: Tanzania and OP 4.12 as far as it clearly that land owners, with or (a) those who have formal legal those with formal legal rights without formal legal rights, are entitled rights including customary and those without formal legal to full, fair and prompt compensation. and traditional rights; rights but have a claim to land They also get disturbance allowance, (b) those who do not have and assets are concerned transport allowance, accommodation formal legal rights to the allowance and loss of profit if they were land but have a claim to such However, the lost assets in in actual occupation of the acquired land or assets provided that Tanzania are restricted to land property. such claims are recognized and developments on land, and under the law of the country where relevant, loss of profits. Lost assets are limited to “unexhausted (c) those who have no legal The lost assets under OP 4.12 improvements”, that is the land and rights to the land they are are much wider than land and developments on the land. occupying include loss of access to livelihoods and standard of The law does not cover economic and Person covered under living and seeks to improve social impacts of relocation and as such categories (a) and (b) above, them or at least to restore them socio-economic surveys are not part of are provided compensation for to pre-displacement levels the land acquisition process the land they other assets they lose and are entitled to full, fair and prompt compensation as well as other relocation assistance. Those under (c) are provided resettlement assistance which may consist of land, other assets, cash, and employment and so on, as appropriate. Socio-economic impacts to Page 25 of 88 Types of affected Tanzanian Law World Bank OP 4.12 Comparison/Gaps Persons/Lost Assets PAPs are taken into consideration in preparing the RAP Land Tanzanian law does not recognize PAPs are entitled to some form WB OP 4.12 recognizes a Tenants/Squatters tenants as being entitled to compensation of compensation whatever the wider spectrum of PAPs. The legal/illegal recognition of their Tanzania spectrum is limited to occupancy those who can prove proprietary rights. It does not include tenants Squatters may be paid compensation, Squatters may fit under WB OP 4.12 recognizes those depending on a decision by the category (c) above and are without recognizable legal right Government. provided resettlement or claim to land they occupy, assistance in lieu of therefore could include In some cases however they are not paid. compensation for the land they squatters among the PAPs who This include those who construct on road occupy as well as other are entitled to resettlement reserves relocation assistance. assistance in lieu of the land they occupy, as well as other assistance. This is different from the Tanzanian situation where such people are not entitled to any assistance. Land Users Tanzania law on compulsory acquisition WB OP 4.12 includes displaced and compensation is limited to those who persons who have no can prove de jure or de facto land recognizable legal right or ownership. Users are not covered claim to the land they are occupying Owners of non- Tanzanian law makes no differentiation Under the WB OP 4.12 The gap between Tanzania and permanent buildings between owners of permanent and non- permanent and non-permanent WB OP 4.12 is about Owners of permanent permanent buildings. As long as buildings need to be eligibility, which is hinged Page 26 of 88 Types of affected Tanzanian Law World Bank OP 4.12 Comparison/Gaps Persons/Lost Assets buildings ownership can be proved compensation compensated. upon formal or informal is payable. ownership. Where however, the displaced Determination of compensation is based persons have no recognizable While, in Tanzania, on the market value of the property. In legal rights they are to be compensation is based on practice though, the depreciated provided with resettlement market value, determined using replacement cost approach is used, assistance in lieu of the depreciated replacement meaning that PAPs do not get the full compensation for the land they cost approach for developments replacement cost of the lost assets. occupy, as well as other on land, WB OP 4.12 requires assistance. that compensation should be sufficient to replace the lost Cash compensation levels land and other assets at full should be sufficient to replace replacement cost. the lost land and other assets at full replacement cost in local markets. Timing of Tanzanian law requires that WB OP 4.12 displaced persons In terms of timing, both compensation compensation be full, fair and prompt. are provided prompt and Tanzanian laws and WB OP payments Prompt means it should be paid within effective compensation at full 4.12 require that compensation six months, failure to do which attracts replacement cost for losses of be paid promptly. an interest rate equivalent to the average assets directly attributable to rate offered by commercial banks on the project before construction This however, rarely happens fixed deposits. starts. in practice as can be testified from may projects that have Legally, compensation for the acquired involved large scale land land does not have to be paid before acquisition. possession can be taken, but in current practice it is usually paid before existing occupiers are displaced. In practice, compensation is not paid Page 27 of 88 Types of affected Tanzanian Law World Bank OP 4.12 Comparison/Gaps Persons/Lost Assets promptly most of the time, and delays are not rectified paying the interest rate as required by the law Calculation of According to the Land Assessment of the WB OP 4.12 requires that the Tanzania law provides for the compensation and value of Land for Compensation) displaced persons be provided calculation of compensation on valuation Regulations, 2001, as well as the Village with prompt and effective the basis of the market value of Land Regulations, 2001, compensation compensation at full the lost land and unexhausted for loss of any interest inland shall replacement cost for losses of improvements, plus a include the value of unexhausted assets attributable direct to the disturbance, accommodation, improvements, disturbance allowance, project. and accommodation allowance, transport allowance, accommodation and loss of profits where allowance, and loss of profits. Replacement cost is the method applicable. of valuation of assets that helps The basis for assessment any land and determine the amount sufficient Since depreciation is applied, unexhausted improvement for purposes to replace lost assets and cover the amount paid does not in of compensation is the market value of transaction costs. Depreciation most cases amount to that such land. is not to be taken into account required to replace the lost when applying this method. assets. Besides, other types of The market value is arrived at by the use assets (besides land) are not of comparative method evidenced by For losses that cannot easily be taken into consideration. actual recent sales of similar properties; valued or compensated in or by the use of the income approach, or monetary terms (e.g. access to replacement cost method, where the public services, customers and property is of special nature and not suppliers, or to fishing, grazing saleable. or forest areas) attempts are made to establish access to In practice, with land an attempt is made equivalent and culturally to establish market value from recent acceptable resources and sales, but these are usually not earning opportunities. transparent. As for unexhausted improvements in terms of buildings and Page 28 of 88 Types of affected Tanzanian Law World Bank OP 4.12 Comparison/Gaps Persons/Lost Assets other civil infrastructure, the depreciated replacement cost approach is used Relocation and Tanzanian laws do not provide for OP 4.12 stipulate that where Tanzanian law provides for Resettlement relocation and resettlement. However, project impacts include transport allowance for 12 tons there are a few cases where the physical relocation, measures of luggage for up to 12 government has provided both should be taken to ensure that kilometres from the acquired compensation and alternative land, but the displaced persons are: (i) land, provided the displaced this has been done at its discretion. In provided with assistance (such person was living on that land. general however, the government feels as moving allowance) during In lieu of housing that it has discharged its duty once relocation; and (ii) provided accommodation allowance is compensation is paid, and it is up to the with residential housing, or made in the form of rent for 36 displaced persons to resettle and re- housing sites, or, as required, months. establish themselves elsewhere. agricultural sites for which a combination of productive Occasionally, in a discretionary potential, locational advantages manner alternative land is and other factors is at least awarded. equivalent to the advantages lost. Completion of The government can, under the law, take WB OP 4.12 stipulates that it is The Land Acquisition Act, resettlement and possession of the acquired land at the end necessary to ensure that 1967, allows the government to compensation of the notice to acquire period, before displacement or restriction to take possession of the acquired paying compensation. access does not take place land before paying before necessary measures for compensation. Current practice however is such that resettlement are in place. In possession is usually after the payment particular, taking of land and Current practice endeavors to of compensation whereby the displaced related assets may take place pay compensation before taking persons are given time to vacate the land, only after compensation has possession of the land. which is usually as soon as possible been paid, and where applicable, resettlement sites and moving allowance have been provided to the displaced Page 29 of 88 Types of affected Tanzanian Law World Bank OP 4.12 Comparison/Gaps Persons/Lost Assets persons. Livelihood restoration There are no legal provisions requiring WB OP 4.12 provides that the There are no transitional and assistance the government to restore livelihood or resettlement plan or policy measures provided for under to provide assistance towards the include measures to ensure that Tanzanian law and practice; restoration of such livelihoods. the displaced persons are (i) nor are there provisions for offered support after compensation as a result of Indeed, compensation is not payable in displacement for a transitional restrictions to access to the case of restrictions to access to areas period, based on a reasonable livelihood. The Tanzanian law of livelihood opportunities. estimate of the time likely to be does not make provisions needed to restore their requiring the government to Moreover there are no provisions that livelihood and standard of pay special attention to require the government to pay special living; and, (ii) provided with vulnerable groups in the attention to vulnerable groups or development assistance in administration of compensation indigenous peoples addition to compensation measures, such as land preparation, credit facilities, training or job opportunities. Consultation and There scanty provisions related to WB OP 4.12 requires that The provisions in WB OP 4.12 disclosure consultation and disclosure in Tanzanian displaced persons are (i) requiring consultation and law. informed about their options disclosure have no equivalent and rights pertaining to in Tanzanian law and practice The notice, under the Land Acquisition resettlement; and, (ii) consulted Act, informs land owners about the on, offered choices among, and President’s need to acquire their land, provided with technically and and their right to give objections. The economically feasible Land Act allows displaced persons to fill resettlement alternatives. in forms requiring that their land be valued, and giving their own opinion as to what their assets are worth. Since resettlement is not provided for legally, there are no provisions about Page 30 of 88 Types of affected Tanzanian Law World Bank OP 4.12 Comparison/Gaps Persons/Lost Assets informing the displaced persons about their options and rights; nor are they offered choice among feasible resettlement alternatives. Grievance mechanism Under s. 13 of the Land Acquisition Act, WB OP 4r.12 provides that The law in Tanzania does not and dispute resolution where there is a dispute or disagreement displaced persons and their provide for the establishment of relating to any of .the following matters: communities, and any host grievance resolution (a) the amount of compensation; communities receiving them, mechanisms specific to (b) the right to acquire the land; are provided with timely and particular resettlement cases. (c) the identity of persons entitled to relevant information, consulted compensation; on resettlement options, and (d) the application of section 12 to the offered opportunities to land; participate in planning (e) any right privilege or liability implementing and monitoring conferred or imposed by this Act; resettlement. Appropriate and (f) the apportionment of compensation accessible grievance between the persons entitled to the mechanisms must be same and such dispute or established for these groups disagreement is not settled by the parties concerned within six weeks from the date of the publication of notice that the land is required for a public purpose the Minister or any person holding or claiming any interest in the land may institute a suit in the High Court of Tanzania for the determination of the dispute. In practice the government tries to resolve grievances through public meetings of the affected persons. Page 31 of 88 5. COMPENSATION FOR LAND AND OTHER ASSETS 5.1 Introduction The RPF guidelines apply to all components under the proposed Tanzania Intermodal and Rail Development Project (TIRP), whether or not they are directly funded in whole or in part by the Project. The RPF applies to activities in sub-projects (or components) affecting those who would be physically displaced or who would lose some or all access to resources, and regardless of the total number affected, the severity of impact, and their legal status (e.g. the RPF guidelines apply also to those with ill-defined or no title to the land). The RPF provides special attention to the needs of vulnerable groups among the PAPs, especially households with incomes below the national poverty line, including the landless, elderly and disabled, women and children, indigenous groups and ethnic minorities, and other historically disadvantaged. 5.2 Project Activities with Potential Resettlement Impacts The activities in the TIRP that are expected to have some resettlement impacts on encroachers include the following: Component A: Improvement of Rail Infrastructure (US$154.61 million) This component includes the rehabilitation of key sections of the railway track and other infrastructure improvements to guarantee a reliable service between Dar es Salam Port and Isaka Terminal. This will include the following main activities: (a) The rehabilitation of some railway track sections requiring urgent repairs on the 970 km long Dar es Salaam - Isaka line (US$81.51 million). The Project would conduct full depth rehabilitation of 90 km of the railway line, replenishment of ballast for 300 km, and re-ballast in stations sections for 25 km. Component C: Development of Isaka Terminal and Dar es Salaam Port Platform (US$8.29 million) This component comprises the development of intermodal container terminals in the port of Dar es Salaam and Isaka to allow for more efficient modal transfers to/from the rail. (a) The design and civil works to construct rail exchanges in the Terminal in Isaka (US$4.18 million). The existing Isaka terminal would be relayed and the terminal platform would also be improved to be able to efficiently handle the 40 container locomotive. The project would finance the design, the works, and handling equipment. Page 32 of 88 Since the exact nature and locations of sub-projects are known, only the exact impact at this point is not known and will be only known upon completion of the detail design, the following categories of project affected persons (PAPs) will be used in identifying groups of PAPs for the purpose of determining impacts.  Project affected persons (PAPs) are individuals whose assets may be lost, including land, property, other assets, and/or access to natural and/or economic resources as a result of activities related to sub-project(s).  Project affected households are groups of PAPs in one household and where one or more of its members are directly affected by the TIRP. These include members like the head of household, male, and female members, dependent relatives, tenants, etc.  Vulnerable groups of people. From these households the TIRP will separately identify the vulnerable members, such as those who are too old or too ill; children; those stricken with HIV/AIDS; women; unemployed youth; etc. Households headed by women that depend on sons, brothers, and others for support are especially vulnerable. Similarly, households with elderly or seriously ill persons are eligible for additional support. Before implementation of the TIRP, a social assessment will be carried out to identify the areas or sites expected resettlement impacts due to land acquisition or restriction of access to resources. At that stage, OP 4.12 calls for the preparation of separate stand-alone Resettlement Action Plans (RAPs) . The following procedural guidelines will apply when it is determined that a RAP would be developed. (i) All potential PAPs should be identified (through a scoping exercise) and informed about their options and rights pertaining to compensation for land and assets to be acquired by the sub-project(s); (ii) PAPs must be consulted about land acquisition and compensation and offered technical and financial options, including the most economically feasible alternatives; and (iii)PAPs should receive reasonable compensation at full replacement cost for losses of assets and access attributable to the sub-project. 5.3 Screening This process would lead to the creation of a list of the number and types of project activities that may potentially involve resettlement issues. This list will be presented to affected communities using a sensitization and consultation process. These consultations will be documented. Page 33 of 88 5.4 RAP Preparation As soon as project activities are approved by RAHCO, a consultative and participatory process for preparing a RAP will be started, as follows: (i) A socio-economic survey will be completed to determine scope and nature of resettlement impacts. (ii) The socio-economic study will be carried out to collect data in all affected sites. (iii)The socio-economic assessment will focus on the potential affected communities, including some demographic data, description of the area, livelihoods, the local participation process, and establishing baseline information on livelihoods and income, landholding, etc. Annex 2 describes the requirements for the RAP in detail. In general, the RAP contain the following information: (i) Baseline Census; (ii) Socio-Economic Survey; (iii)Specific Compensation Rates and Standards; (iv) Entitlements related to any additional impacts; (v) Site Description; (vi) Programs to Improve or Restore Livelihoods and Standards of Living; (vii) Detailed cost estimates and Implementation Schedule. The RAP will be prepared by RAHCO and TRL. The following guidelines are used when a RAP is developed. (i) Consultation and participatory approaches. A participatory approach is adopted to initiate the compensation process. The consultations must start during the planning stages when the technical designs are being developed, and at the land selection/screening stage. The process therefore seeks the involvement of PAPs throughout the census for identifying eligible PAPs and throughout the RAP preparation process. (ii) Disclosure and notification. All eligible PAPs are informed about the TIRP and the RAP process. A cut-off date is established as part of determining PAPs eligibility. In special cases where there are no clearly identifiable owners or users of the land or asset, the RAP team must notify the respective local authorities and leaders. A “triangulation” of information–affected persons; community leaders and representatives; and an independent agent (e.g. local organization or NGO; other government agency; land valuer) – may help to identify eligible PAPs. The RAP must notify PAPs about the established cut-off date and its significance. PAPs must be notified both in writing and by verbal notification delivered in the presence of all the relevant stakeholders. Page 34 of 88 (iii)Documentation and verification of land and other assets. The government authorities at both national and local levels; community elders and leaders; representatives from RAHCO and TRL will arrange meetings with PAPs to discuss the compensation and valuation process. For each individual or household affected by the sub-project, the RAP preparation team will complete a Compensation Report containing necessary personal information on the PAPs and their household members; their total land holdings; inventory of assets affected; and demographic and socio-economic information for monitoring of impacts. This information will be documented in a Report, and ideally should be “witnessed” by an independent or locally acceptable body (e.g. Resettlement Committee). The Reports will be regularly updated and monitored. (iv) Compensation and valuation. All types of compensation will be clearly explained to the individual and households involved. These refer especially to the basis for valuing the land and other assets. Once such valuation is established, RAHCO and TRL will produce a Contract or Agreement that lists all property and assets being acquired by the sub-project and the types of compensation selected. Table 2 below provides a sample of entitlements that are eligible for compensation. These options include in-kind (e.g. replacement housing) and cash compensation. All compensation should occur in the presence of the affected persons and the community local leaders. Page 35 of 88 Table 3: Entitlement Matrix Land and Types of Impact Person(s) Affected Compensation/Entitlement/Benefits Assets Agricultural land Less than 20% of land Farmer/ title holder Cash compensation for affected land equivalent to holding affected replacement value, taking into account market values for the land Land remains economically viable. Tenant/ lease Cash compensation for the harvest or product from the holder affected land or asset, equivalent to average market value of last 3 years, or market value of the crop for the remaining period of tenancy/ lease agreement, whichever is greater. Greater than 20% of Farmer/ Title Land for land replacement where feasible, or compensation in land holding lost holder cash for the entire landholding according to PAP’s choice. Cash compensation will take into account market values for Land does not become the land. economically viable. Land for land replacement will be in terms of a new parcel of land of equivalent size and productivity with a secure tenure status at an available location which is acceptable to PAPs. Transfer of the land to PAPs shall be free of taxes, registration, and other costs. Relocation assistance (costs of shifting + assistance in re- establishing economic trees + allowance up to a maximum of 12 months while short- term crops mature ) Relocation assistance (costs of shifting + assistance in re- establishing economic trees + allowance up to a maximum of Page 36 of 88 Land and Types of Impact Person(s) Affected Compensation/Entitlement/Benefits Assets 12 months while short- term crops mature ) Tenant/Lease Cash compensation equivalent to average of last 3 years’ holder market value for the mature and harvested crop, or market value of the crop for the remaining period of tenancy/ lease agreement, whichever is greater. Relocation assistance (costs of shifting + assistance in re- establishing economic trees + allowance up to a maximum of 12 months while short- term crops mature. Relocation assistance (costs of shifting + assistance in re- establishing economic trees + allowance up to a maximum of 12 months while short- term crops mature). Relocation assistance (costs of shifting + allowance). Commercial Land used for Title holder/ Cash compensation for affected land, taking into account Land business partially business owner market values for the land. affected Opportunity cost compensation equivalent to 5% of net Limited loss annual income based on tax records for previous year (or tax records from comparable business, or estimates where such records do not exist). Business owner is Opportunity cost compensation equivalent to 10% of net lease holder annual income based on tax records for previous year (or tax records from comparable business, or estimates where such records do not exist). Assets used for Title Land for land replacement or compensation in cash according business severely holder/business to PAP’s choice. Land for land replacement will be provided affected owner in terms of a new parcel of land of equivalent size and market potential with a secured tenure status at an available location If partially affected, which is acceptable to the PAP. Cash compensation will take Page 37 of 88 Land and Types of Impact Person(s) Affected Compensation/Entitlement/Benefits Assets the remaining assets into account market values for the land. become insufficient for business purposes Transfer of the land to the PAP shall be free of taxes, registration, and other costs. Relocation assistance (costs of shifting + allowance) Opportunity cost compensation equivalent to 2 months net income based on tax records for previous year (or tax records from comparable business, or estimates) Business person is Opportunity cost compensation equivalent to 2 months net lease holder income based on tax records for previous year (or tax records from comparable business, or estimates), or the relocation allowance, whichever is higher. Relocation assistance (costs of shifting) Assistance in rental/ lease of alternative land/ property (for a maximum of 6 months) to reestablish the business. Residential Land Land used for Title holder Cash compensation for affected land, taking into account residence partially market values for the land. affected, limited loss Remaining land viable for present use. Rental/lease holder Cash compensation equivalent to 10% of lease/ rental fee for the remaining period of rental/ lease agreement (written or verbal) Title holder Land for land replacement or compensation in cash according to PAP’s choice. Cash compensation will take into account market values for the land. Page 38 of 88 Land and Types of Impact Person(s) Affected Compensation/Entitlement/Benefits Assets Land for land replacement shall be of minimum plot of acceptable size under the zoning law/ s or a plot of equivalent size, whichever is larger, in either the community or a nearby resettlement area with adequate physical and social infrastructure systems as well as secured tenure status. When the affected holding is larger than the relocation plot, cash compensation to cover the difference in value. Cash compensation will take into account market values for the land. Transfer of the land to the PAP shall be free of taxes, registration, and other costs. Relocation assistance (costs of shifting + allowance) Land and assets used Rental/lease holder Refund of any lease/ rental fees paid for time/ use after date of for residence severely removal affected Cash compensation equivalent to 3 months of lease/ rental fee Remaining area insufficient for Assistance in rental/ lease of alternative land/ property continued use or becomes smaller than Relocation assistance (costs of shifting + allowance) minimally accepted under zoning laws Buildings and Structures are partially Owner Cash compensation for affected building and other fixed structures affected assets, taking into account market values for structures and materials. Remaining structures viable for continued Cash assistance to cover costs of restoration of the remaining Page 39 of 88 Land and Types of Impact Person(s) Affected Compensation/Entitlement/Benefits Assets use structure Rental/lease holder Cash compensation for affected assets (verifiable improvements to the property by the tenant), taking into account market values for materials. Disturbance compensation equivalent to two months rental costs Entire structures are Owner Cash compensation for entire structure and other fixed assets affected or partially without depreciation, or alternative structure of equal or better affected size and quality in an available location which is acceptable to the PAP. Compensation will take account of market values for Remaining structures structures and materials. not suitable for continued use Right to salvage materials without deduction from compensation. Relocation assistance (costs of shifting + allowance). Rehabilitation assistance if required (assistance with job placement, skills training). Rental/lease holder Cash compensation for affected assets (verifiable improvements to the property by the tenant), taking into account market values for materials. Relocation assistance (costs of shifting + allowance equivalent to four months rental costs). Assistance to help find alternative rental arrangements. Rehabilitation assistance if required (assistance with job placement, skills training). Squatter/informal Cash compensation for affected structure without Page 40 of 88 Land and Types of Impact Person(s) Affected Compensation/Entitlement/Benefits Assets dweller depreciation, taking into account market values for materials. Right to salvage materials without deduction from compensation. Relocation assistance (costs of shifting + assistance to find alternative secure accommodation preferably in the community of residence through involvement of the project. Alternatively, assistance to find accommodation in rental housing or in a squatter settlement scheme, if available). Rehabilitation assistance if required assistance with job placement, skills training). Street vendor Opportunity cost compensation equivalent to 2 months net (informal without income based on tax records for previous year (or tax records title or lease to the from comparable business, or estimates), or the relocation stall or shop) allowance, whichever is higher. Relocation assistance (costs of shifting). Assistance to obtain alternative site to re- establish the business. Standing crops Crops affected by land PAP (whether Cash compensation equivalent to average of last 3 years acquisition or owner, tenant, or market value for the mature and harvested crop. temporary acquisition squatter) or easement Trees Trees lost Title holder Cash compensation based on type, age and productive value of affected trees plus 10% premium. Temporary Temporary acquisition PAP (whether Cash compensation for any assets affected (e. g. boundary Acquisition owner, tenant, or wall demolished, trees removed), taking into account market squatter) values for materials. Page 41 of 88 (v) Community payments. Although most sub-projects do not normally take land and other assets belonging to a community, such as a community center, school, or sacred site, if this occurs in a sub-project, the community (as a whole) will be compensated. This compensation will be in the form of reconstruction of the facility (in case of damages) or replacement at least the same standard or equivalent or better standard required by local planning regulation. Examples of community compensation expansion of grazing grounds; rehabilitation of school buildings, public toilets, health facilities; installation of wells or pumps; creation of market places; and reconstruction of community roads. (vi) Grievance mechanism. The sub-project ARAP/ RAP team will establish an independent grievance mechanism. This may be set up through Local Authorities, including a Resettlement or Land Committee and through community leaders. All PAPs will be informed about how to register grievances or complaints, including specific concerns about compensation and relocation. The PAPs should also be informed about the dispute resolution process, specifically about how the disputes will be resolved in an impartial and timely manner. The ARA/ RAP Team will produce a Report containing a summary of all grievances. If needed, the dispute resolution process should include Tanzanian Courts of Law, but traditional institutions can be an effective first step in both receiving and resolving grievances. Page 42 of 88 6. IMPLEMENTATION SCHEDULE AND COSTS 6.1 Introduction This section presents an institutional arrangements and responsibilities for the implementation of the RPF. Since costs of resettlement and compensation are based on technical designs and results of scoping, it is not possible to produce a detailed budget for ARA/RAP implementation. This section also gives an outlines on the budget for ARAP/RAP implementation will be established. 6.2 Institutional Arrangements for RPF Implementation The TIRP is a project of the United Republic of Tanzania and any compensation and resettlement will be the responsibility of the Government of Tanzania through RAHCO. The process of resettlement and compensation will be in line with Tanzanian legislative requirements (as described in Section 4), augmented in certain areas to bring these into line with World Bank Safeguard Policy OP 4.12 as set out in this RPF (as described in Section 4.6). 6.2.1 National Level Institutions and Responsibilities At a National level, the parties responsible for the application of the RPF to TIRP will be the following.  RAHCO will be responsible for (i) ensuring that the RPF requirements are followed; (ii) preparing ARAP or RAP; (iii) monitoring and evaluation of their implementation; and (iv) for reporting on these activities and indicators to the World Bank. As part of these responsibilities, RAHCO will determine an appropriate Resettlement Budget sufficient to meet the objectives of this RPF.  The National Land Valuer will be responsible for preparing valuation forms, approving the valuation process and compensation amounts calculated.  The Ministry of Agriculture, Food Security and Cooperatives will be responsible for providing statistics on crops and productivity per ha. This must be made available to the valuation officers responsible for the valuation process.  The Ministry of Natural Resources and Tourism will be responsible for providing statistics and values of trees per hectare. 6.2.2 District Level Institutions and Responsibilities At a District level, the main party responsible for the application of the RPF is the District Lands Department for facilitating the evaluation, census and evaluation process and for negotiations between RAHCO and the Village Council and PAPs. Also for payment of compensation after the valuation report has been approved, and deals with any conflict that may arise. Page 43 of 88 6.2.3 Village Level Institutions and Responsibilities At a Village level, the parties responsible for the application of the RPF include:  The Village Council, in its capacity as having jurisdiction over Village Land, for consultation with RAHCO, and for identifying replacement land for the individual land owners/PAPs; and  The PAPs, for taking part in the land acquisition process, consultation and in assisting to design the compensation measures. 6.3 Indicative Outline of RAP Budget An indicative RAP budget outline can be found in Table 4 below. Table 4: Indicative Outline of RAP Budget Asset acquisition Amount Total Agency responsible or number estimated cost Land Structure Crops and economic tress Community infrastructure Land Acquisition and Preparation Land Structures Crops areas and others Community infrastructure Relocations Transfer of possessions Installation costs Economic Rehabilitation Training Capital Investments Technical Assistance Monitoring Contingency # Item Costs Assumptions 1 Compensation for loss of Land For land acquisition purposes, based on Tanzanian average /hectare market cost, or from similar projects 2 Compensation for loss of Crops Includes costs of labor invested /hectare of and average of highest price of farm lost staple food crops and Page 44 of 88 Asset acquisition Amount Total Agency responsible or number estimated cost Tanzanian market prices. 3 Compensation for loss of access to Those affected would be pastoralists provided with shared access, or If alternate routes (decision applicable agreed through consultation and participation of all). 4 Compensation for loss of access to Data provided from the revised fishing resources. If socio-economic study will applicable determine market values of catch, fish products etc. 5 Compensation for Buildings and This compensation may be in- Structures kind or cash. Costs for basic housing needs should include If ventilated pit latrines, outside applicable kitchen, and storage. Cash compensation will take into account market values for structures and materials. 6 Compensation for Trees Includes costs of labor invested and average of highest price of /year/tree trees (and tree products) and Tanzanian market prices. 7 Cost of Relocation Assistance/Expenses This cost reflects the moving /household and transportation allowance 8 Cost of Restoration of Individual Income Assumed to be higher than the GDP/capita in Tanzania. 9 Cost of Restoration of Household Income These costs reflect the livelihood restoration program of the RAP. 10 Cost of Training Farmers, pastoralists This is a mitigation measure and other PAPs involving capacity building and involves PAPs and affected communities. RAHCO will determine an appropriate Resettlement Budget which will be financed through the administrative and financial management rules and manuals issued by the Government of Tanzania. However, the table below provides a provisional budget based on the estimated number of encroachments that may occur before start of rehabilitation works under TIRP as described in section 3.4. Page 45 of 88 Table 5: Provisional resettlement and compensation budget for encroachment that may occur before start of rehabilitation works under TIRP Total Average Total estimated Type of encroachment encroachers Costs (USD) cost (USD) Number of encroachers (fixed 1. 3.0 75,000.0 225,000.0 properties) Number of encroachers 2. 14.0 2,500.0 35,000.0 (seasonal crops) Number of encroachers (kiosks 3. and other vendors with 18.0 3,500.0 63,000.0 temporary structures etc) Total 35.0 323,000.0 Page 46 of 88 7. PUBLIC CONSULTATION AND DISCLOSURE PLAN 7.1 Introduction Public consultations in relation to the RAP occur at all stages, starting with inception and planning when the potential lands and alternative sites are being considered. A participatory approach is adopted as an on-going strategy throughout the entire project cycle. Public participation and consultations take place through individual, group, or community meetings. Additionally, radio programs and other media forms may be used to further disseminate information. PAPs are consulted in the survey process; public notices where explanations of the sub-project are made; RAP implementation of activities; and during the monitoring and evaluation process. Selection of ways to consult, and expand participation by PAPs and other stakeholders, will take into consideration literacy levels prevalent in affected communities; ethnicity and cultural aspects; and practical conditions (like distance). The role of traditional political and cultural leaders, including the community elders, in the participation strategy will be important. The RAP team should ensure that these leaders and local representatives of PAPs are fully involved in designing the public consultation procedures. 7.2 Data Collecting Phase Consultations during preparation, in particular, the collection of background information, and the social survey or social assessment, are critical for successful data collection. The levels of consultation will vary from households to community groups, based on the particular context of the sub-project(s). The RAP team will design the questionnaires but it will be the households, organizations, and institutions that will validate their effectiveness through feedback. Focus group meetings with women, farmers’ associations, individuals who own farms, fishing boats, etc, as well as primary and/or secondary schools, health centers, and agricultural cooperative unions are usually good sources for establishing the community baseline situation. 7.3 Implementation Phase During implementation, PAPs will be informed about their rights and options. The grievance mechanism will continue to operate and all grievances will be recorded. The participation of local leaders and PAPs in disseminating information and resolving disputes will be important once RAP implementation starts. A dynamic participatory approach involves PAPs in decision making about livelihood and community development programs. 7.4 Monitoring and Evaluation Phase PAPs representatives will participate in the sub-project workshops at mid-term and at the end of RAP implementation. To the extent possible, the RAP should include social accountability tools Page 47 of 88 like citizen report cards to assess the quality of RAP implementation, and in some cases, assist the RAP team in tracking expenditures. The latter would be significant in helping PAPs with money management and restoring their livelihoods. PAPs will be able to suggest corrective measures, as needed, to improve RAP implementation in the sub-project(s). Prior to closing the RAP, PAPs will participate in a feedback survey as part of the RAP’s independent impact evaluation exercise. Page 48 of 88 8. GRIEVANCE REDRESS MECHANISM 8.1 Introduction A grievance redress mechanism (GRM) must be made available to parties who have grievances or are not satisfied with any part of the resettlement and compensation process. These grievances could relate to the valuation of assets, amount of compensation paid, level of consultation, non- fulfilment of contracts, and timing of compensation, amongst others. 8.2 Grievance Redress Committee In order to address grievances, a Grievance Redress Committee (GRM) will be formed for dealing with any grievances as they arise. This will include a representative of RAHCO’s RAP team, a representative of the District lands Department, a representative of the Village Council, as well as a representative of the PAPs. It should also include an independent valuer if the grievance is in relation to compensation amounts. The grievance procedure will be simple and will be administered as far as possible by the Grievance Committee at the District and Village level. 8.3 Grievance Mechanism Procedures At the beginning of the individual RAP processes, PAPs will be informed about how to register grievances or complaints, including specific concerns about compensation and relocation. The PAPs should also be informed about the dispute resolution process, specifically about how the disputes will be resolved in an impartial and timely manner. All attempts shall be made to settle grievances amicably. The grievance redress mechanism is designed with the objective of solving disputes at the earliest possible time, which will be in the interest of all parties concerned and therefore, it implicitly discourages referring such matters to the National level government authorities or National level courts for resolution. Compensation and resettlement plans (contracts) will be binding under statute. The Grievance Committee shall maintain records where grievances and complaints, including minutes of discussions, recommendations and resolutions made, will be recorded. The procedure for handling grievances should be as follows. (i) The affected person should file his grievance in writing, to the Village Leader. The grievance note should be signed and dated by the aggrieved person. Where the affected person is unable to write, he should obtain assistance to write the note and emboss the letter with his/her thumbprint. A sample grievance form is provided in Annex 3. Page 49 of 88 (ii) The Village Leader should notify the Grievance Committee and respond within 14 days during which any meetings and discussions to be held with the aggrieved person should be conducted. If the grievance relates to valuation of assets, an independent valuer should be requested to revalue the assets, and this may necessitate a longer period of time. In this case, the aggrieved person must be notified by the Village Leader that his/her complaint is being considered. (iii)If the aggrieved person does not receive a response or is not satisfied with the outcome within the agreed time, s/he may lodge his/her grievance to the District Administration. (iv) The Grievance Committee will then attempt to resolve the problem (through dialogue and negotiation) within 14 days of the complaint being lodged. If no agreement is reached at this stage, then the complaint can be taken through the formal court process, i.e. to the Village Land Council, the Ward Tribunal where relevant, District Tribunal and the High Court (Land Division) at the National level . The Grievance Committee will produce a Report containing a summary of all grievances and will make this available to RAHCO on a quarterly basis. The Grievance Redress mechanism flow is illustrated in Figure 1below. Figure 1: Grievance Redress Mechanism Flow Chart* PAP accepts compensation package PAP files Grievance complaint Committee Village Land Council Ward Tribunal District Land & Housing Tribunal High Court (Land Division) *Adapted from the Road Sector Compensation and Resettlement Guidelines, Ministry of Infrastructure Development Page 50 of 88 9. MONITORING AND EVALUATION OF IMPACTS 9.1 Introduction The RAP team will be expected to develop and implement a Monitoring and Evaluation Plan (MEP). The main indicators that the MEP will measure include: (i) impacts on affected individuals, households, and communities to be maintained at their pre-project standard of living, and better; (ii) improvement of communities affected by the project; and (iii) management of disputes or conflicts. In order to measure these impacts, the ARAP/ RAP identifies the specific indicators to be monitored; define how they will be measured on a regular basis; and identify key monitoring milestones (e.g. at mid-point of the ARAP/ RAP implementation process). 9.2 Establishment of Reporting System The PIU will establish a reporting system for RAP that will: (i) Provide timely information to the project about all resettlement and compensation issues arising as a result of RAP related activities; (ii) Identify any grievances, especially those that have not yet been resolved at the local level and which may require resolution at the higher levels (e.g. by the PIU); (iii)Document completion of project resettlement and compensation that are still pending, including for all permanent and temporary losses; (iv) Evaluate whether all PAPs have been compensated in accordance with the requirements of this RPF and that PAPs have better living conditions and livelihoods; and (v) Identify mitigation measures, as necessity, when there are significant changes in the indicators that may require strategic interventions (e.g. vulnerable groups are not receiving sufficient support from the sub-project). The independent impact evaluation will determine: (i) If compensation payments have been completed in a satisfactory manner; and (ii) If there are improvements in livelihoods and well-being of PAPs. Several indicators are used to measure these impacts. These include, among others, a comparison of income levels before-and-after; access to livelihoods and employment; changes in standards of housing and living conditions; and improvements in level of participation in sub-project activities. There are measures to verify these basic indicators, such as number of children in- school (compared to pre-RAP levels); changes in health standards; and changes in access to markets or roads – all of which may reflect overall improvements in standards of living. The following methods will be used for measuring impacts: (i) Questionnaires with data stored in a database for comparative analysis (before-after and with-without); (ii) Documentation and recording of PAPs situation, including subsequent uses of assets/improvements; Page 51 of 88 (iii) Relocation/resettlement and Compensation Reports, including status of land impacts; percentage of individuals selecting cash or a combination of cash and in- kind compensation; proposed use of payments; (iv) Number of grievances and time and quality of resolution; and (v) Ability of individuals and families to re-establish their pre-resettlement activities, in terms of improvements in land and crop production, and/or presence of other alternative incomes. The RAP team will maintain, together with local officials, basic information on all physical or economic displacement arising from the sub-project. This includes an update, for example on a quarterly basis, of the following: (i) Number of sub-projects requiring preparation of an RAP; (ii) Number of households and individuals physically or economically displaced by each sub-project; (iii)Length of time from sub-project identification to payment of compensation to PAPs; (iv) Timing of compensation in relation to commencement of physical works; (v) Amount of compensation paid to each PAP household (if in cash), or the nature of compensation (if in kind); (vi) Number of people raising grievances in relation to each sub-project; (vii) Number of unresolved grievances. The PIU will review these statistics to determine whether the RAP implementation arrangements, as defined in this RPF, are effective in addressing RAP related issues. Financial records will be maintained by the sub-projects and the PIU, to determine the final cost of RAP implementation. The following indicators (in Table 6) can be used to monitor implementation of the RAP. Table 6: Indicators of RAP Impacts Monitoring (of Issues) Evaluation (of Impacts) Number of compensation (and valuation) not Changes (+/-) in PAPs conditions during completed transition process Number of sub-projects unable to settle Changes (+/-) in PAPs income and livelihood compensation after two years conditions Number of grievances filed Quality of grievances or disputes resolved (qualitative) Number of livelihood restoration programs Changes (+/-) in affected households income completed levels Pre project production versus present Equal or improved production per affected production levels ( crops for crops, land for household/homestead land) Page 52 of 88 9.3 Annual Audit The annual audit of RPF implementation, and as applicable RAP implementation in sub- project(s), includes: (i) a summary of RAP performance of each sub-project; (ii) a compliance review of RAP implementation process; and (iii) a progress report on the quality of RAP implementation in terms of application of guidelines provided in this RPF. The audit will verify results of monitoring of RAP implementation indicators, and assess whether the project achieved the resettlement objectives. A specific measure of whether livelihood and living standards have been restored or enhanced will be completed. The audit will also assess the efficiency, effectiveness, impact, and sustainability of RAP sub-project activities. The aim is to learn lessons for application to future sub-projects or other projects in the sector and in the country. Finally, the audit will ascertain whether the resettlement entitlements were appropriate, as defined in the RPF guidelines. 9.4 Socio-Economic Assessment The purpose of socio-economic assessment, which is part of the evaluation process, is to ensure that PAPs livelihood and well being have improved, and have not worsened as a result of the sub-project. An assessment will be undertaken on payment of compensation, restoration of income and livelihoods, and provision of sufficient community development activities. Monitoring of living standards will continue after resettlement. Additionally a reasonable period (usually two years) must be established for monitoring post-resettlement impacts. A number of indicators will be used for measuring status of affected people. Most socio-economic assessments use surveys, focus group meetings, and participatory appraisal tools for measuring impacts. A separate assessment must be made for each sub-project. Additionally, since a baseline household survey was completed during RAP preparation, the end- RAP assessment can measure changes from this baseline. Page 53 of 88 LIST OF ANNEXES Annex 1: World Bank Resettlement Policy (Excerpt from World Bank Operational Policy 4.12, Involuntary Resettlement) Annex 2: Annotated Outline for Preparing a Resettlement Action Plan (RAP) Annex 3: Sample Grievance and Resolution Form Annex 4: Sample Table of Contents for Consultation Reports Annex 5: Glossary of Terms Annex 6: Relevant Tanzanian Laws Page 54 of 88 Annex 1: World Bank Resettlement Policy [Excerpt from the World Bank OP4.12 Involuntary Resettlement, Revised April 2004] These policies were prepared for use by World Bank staff and are not necessarily a complete treatment of the subject. OP 4.12 (Revised April 2004) applies only to projects that are governed by OP / BP 6.00, Bank Financing - that is, those in countries with approved country financing parameters. Other operational policy statements governing Bank financing that have been amended to reflect OP/BP 6.00 also apply to these projects. Projects in countries without approved country financing parameters continue to be subject to other operational policy statements governing Bank financing. Resettlement Policy Framework For sector investment operations that may involve involuntary resettlement, the Bank requires that the project implementing agency screen subprojects to be financed by the Bank to ensure their consistency with this OP. For these operations, the borrower submits, prior to appraisal, a resettlement policy framework that conforms to this policy (see Annex A, paragraphs 23-25). The framework also estimates, to the extent feasible, the total population to be displaced, and the overall resettlement costs. For financial intermediary operations that may involve involuntary resettlement, the Bank requires that the financial intermediary (FI) screen subprojects to be financed by the Bank to ensure their consistency with this OP. For these operations, the Bank requires that before appraisal the borrower or the FI submit to the Bank a resettlement policy framework conforming to this policy (see Annex A, paragraphs 23-25). In addition, the framework includes an assessment of the institutional capacity and procedures of each of the FIs that will be responsible for subproject financing. When, in the assessment of the Bank, no resettlement is envisaged in the subprojects to be financed by the FI, a resettlement policy framework is not required. Instead, the legal agreements specify the obligation of the FIs to obtain from the potential sub-borrowers a resettlement plan consistent with this policy if a subproject gives rise to resettlement. For all subprojects involving resettlement, the resettlement plan is provided to the Bank for approval before the subproject is accepted for Bank financing. For other Bank-assisted project with multiple subprojects 26 that may involve involuntary resettlement, the Bank requires that a draft resettlement plan conforming to this policy be submitted to the Bank before appraisal of the project unless, because of the nature and design of the project or of a specific subproject or subprojects (a) the zone of impact of subprojects cannot be determined, or (b) the zone of impact is known but precise sitting alignments cannot be determined. In such cases, the borrower submits a resettlement policy framework consistent with this policy prior to appraisal (see Annex A, paragraphs 23-25). For other subprojects that do not fall within the above criteria, a resettlement plan conforming to this policy is required prior to appraisal. For each subproject included in a project described in paragraphs 26, 27, or 28 that may involve resettlement, the Bank requires that a satisfactory resettlement plan or an abbreviated Page 55 of 88 resettlement plan that is consistent with the provisions of the policy framework be submitted to the Bank for approval before the subproject is accepted for Bank financing. For projects described in paragraphs 26-28 above, the Bank may agree, in writing, that sub- project resettlement plans may be approved by the project implementing agency or a responsible government agency or financial intermediary without prior Bank review, if that agency has demonstrated adequate institutional capacity to review resettlement plans and ensure their consistency with this policy. Any such delegation, and appropriate remedies for the entity’s approval of resettlement plans found not to comply with Bank policy, is provided for in the legal agreements for the project. In all such cases, implementation of the resettlement plans is subject to ex post review by the Bank. Page 56 of 88 Annex 2: Annotated Outline for Preparing a Resettlement Action Plan (RAP) This template is extracted from OP 4.12 Annex A. Its full description can be found in the World Bank external website. The scope and level of detail of the RAP will vary depending on the magnitude and complexity of resettlement or displacement. The RAP is prepared based on the most recent and accurate information on the: (i) proposed resettlement and its impacts on displaced persons and other adversely affected groups; and (ii) legal issues affecting resettlement. The RAP covers elements that are specific to the project context. A broad outline of the RAP, as applied to sub-projects covered under a RPF includes, but is not limited to, the following: Description of the sub-project: General description of the sub-project and identification of sub- project area or areas. Potential Impacts: Identification of the: (i) the sub-project components or activities that require resettlement or restriction of access; (ii) zone of impact of components or activities; (iii) alternatives considered to avoid or minimize resettlement or restricted access; and (iv) mechanisms established to minimize resettlement, displacement, and restricted access, to the extent possible, during project implementation. Objectives: The main objectives of the resettlement program as these apply to the sub-projects. Socio-economic studies: The findings of socio-economic studies to be conducted in the early stages of project preparation, and with the involvement of potentially affected people will be needed. These generally include the results of a census of the affected populations covering: (i) Current occupants of the affected area as a basis for design of the RAP and to clearly set a cut-off date, the purpose of which is to exclude subsequent inflows of people from eligibility for compensation and resettlement assistance; (ii) Standard characteristics of displaced households, including a description of production systems, labor, and household organization; and baseline information on livelihoods (including, as relevant, production levels and income derived from both formal and informal economic activities) and standards of living (including health status) of the displaced population; (iii)Magnitude of the expected loss, total or partial, of assets, and the extent of displacement, physical or economic; (iv) Information on vulnerable groups or persons, for whom special provisions may have to be made; and (v) Provisions to update information on the displaced people’s livelihoods and standards of living at regular intervals so that the latest information is available at the time of their displacement, and to measure impacts (or changes) in their livelihood and living conditions Page 57 of 88 There may be other studies that the RAP can draw upon, such as those describing the following: (i) Land tenure, property, and transfer systems, including an inventory of common property natural resources from which people derive their livelihoods and sustenance, non-title- based usufruct systems (including fishing, grazing, or use of forest areas) governed by local recognized land allocation mechanisms, and any issues raised by different tenure systems in the sub project area; (ii) Patterns of social interaction in the affected communities, including social support systems, and how they will be affected by the sub-project; (iii)Public infrastructure and social services that will be affected; and (iv) Social and cultural characteristics of displaced communities, and their host communities, including a description of formal and informal institutions. These may cover, for example, community organizations; cultural, social or ritual groups; and non- governmental organizations (NGOs) that may be relevant to the consultation strategy and to designing and implementing the resettlement activities Legal Framework: The analysis of the legal and institutional framework should cover the following: (i) Scope of existing land and property laws governing resources, including state-owned lands under eminent domain and the nature of compensation associated with valuation methodologies; land market; mode and timing of payments, etc; (ii) Applicable legal and administrative procedures, including a description of the grievance procedures and remedies available to PAPs in the judicial process and the execution of these procedures, including any available alternative dispute resolution mechanisms that may be relevant to implementation of the RAP for the sub-project; (iii)Relevant laws ( including customary and traditional law) governing land tenure, valuation of assets and losses, compensation, and natural resource usage rights, customary personal law; communal laws, etc related to displacement and resettlement, and environmental laws and social welfare legislation; (iv) Laws and regulations relating to the agencies responsible for implementing resettlement activities in the sub-projects; (v) Gaps, if any, between local laws covering resettlement and the Bank’s resettlement policy, and the mechanisms for addressing such gaps; and (vi) Legal steps necessary to ensure the effective implementation of RAP activities in the sub- projects, including, as appropriate, a process for recognizing claims to legal rights to land, including claims that derive from customary and traditional usage, etc and which are specific to the sub-projects. The institutional framework governing RAP implementation generally covers: (i) Agencies and offices responsible for resettlement activities and civil society groups like NGOs that may have a role in RAP implementation; (ii) Institutional capacities of these agencies, offices, and civil society groups in carrying out RAP implementation, monitoring, and evaluation; and Page 58 of 88 (iii)Activities for enhancing the institutional capacities of agencies, offices, and civil society groups, especially in the consultation and monitoring processes. Eligibility: Definition of displaced persons or PAPS and criteria for determining their eligibility for compensation and other resettlement assistance, including relevant cut-off dates. Valuation of and compensation for losses: The methodology to be used for valuing losses, or damages, for the purpose of determining their replacement costs; and a description of the proposed types and levels of compensation consistent with national and local laws and measures, as necessary, to ensure that these are based on acceptable values (e.g. market rates). Resettlement Measures: A description of the compensation and other resettlement measures that will assist each category of eligible PAPs to achieve the objectives of OP 4.12. Aside from compensation, these measures should include programs for livelihood restoration, grievance mechanisms, consultations, and disclosure of information. Site selection, site preparation, and relocation: Alternative relocation sites should be described and cover the following: (i) Institutional and technical arrangements for identifying and preparing relocation sites, whether rural or urban, for which a combination of productive potential, location advantages, and other factors is at least comparable to the advantages of the old sites, with an estimate of the time needed to acquire and transfer land and ancillary resources; (ii) Any measures necessary to prevent land speculation or influx of eligible persons at the selected sites; (iii)Procedures for physical relocation under the project, including timetables for site preparation and transfer; and (iv) Legal arrangements for recognizing (or regularizing) tenure and transferring titles to those being resettled Housing, infrastructure, and social services: Plans to provide (or to finance provision of) housing, infrastructure (e.g. water supply, feeder roads), and social services to host populations; and any other necessary site development, engineering, and architectural designs for these facilities should be described. Environmental protection and management: A description of the boundaries of the relocation area is needed. This description includes an assessment of the environmental impacts of the proposed resettlement and measures to mitigate and manage these impacts (coordinated as appropriate with the environmental assessment of the main investment requiring the resettlement). Community Participation: Consistent with the World Bank’s policy on consultation and disclosure, a strategy for consultation with, and participation of, PAPs and host communities, should include: Page 59 of 88 (i) Description of the strategy for consultation with and participation of PAPs and hosts in the design and implementation of resettlement activities; (ii) Summary of the consultations and how PAPs’ views were taken into account in preparing the resettlement plan; and (iii)Review of resettlement alternatives presented and the choices made by PAPs regarding options available to them, including choices related to forms of compensation and resettlement assistance, to relocating as individual families or as parts of pre-existing communities or kinship groups, to sustaining existing patterns of group organization, and to retaining access to cultural property (e.g. places of worship, pilgrimage centers, cemeteries); and (iv) Arrangements on how PAPs can communicate their concerns to project authorities throughout planning and implementation, and measures to ensure that vulnerable groups (including indigenous peoples, ethnic minorities, landless, children and youth, and women) are adequately represented. The consultations should cover measures to mitigate the impact of resettlement on any host communities, including: (i) Consultations with host communities and local governments; (ii) Arrangements for prompt tendering of any payment due the hosts for land or other assets provided to PAPs; (iii)Conflict resolution involving PAPs and host communities; and (iv) Additional services (e.g. education, water, health, and production services) in host communities to make them at least comparable to services available to PAPs Grievance procedures: The RAP should provide mechanisms for ensuring that an affordable and accessible procedure is in place for third-party settlement of disputes arising from resettlement. These mechanisms should take into account the availability of judicial and legal services, as well as community and traditional dispute settlement mechanisms. RAP implementation responsibilities: The RAP should be clear about the implementation responsibilities of various agencies, offices, and local representatives. These responsibilities should cover (i) delivery of RAP compensation and rehabilitation measures and provision of services; (ii) appropriate coordination between agencies and jurisdictions involved in RAP implementation; and (iii) measures (including technical assistance) needed to strengthen the implementing agencies’ capacities of responsibility for managing facilities and services provided under the project and for transferring to PAPs some responsibilities related to RAP components (e.g. community-based livelihood restoration; participatory monitoring; etc). Implementation Schedule: An implementation schedule covering all RAP activities from preparation, implementation, and monitoring and evaluation should be included. These should identify the target dates for delivery of benefits to the resettled population and the hosts, as well as clearly defining a closing date. The schedule should indicate how the RAP activities are linked to the implementation of the overall project. Page 60 of 88 Costs and budget: The RAP for the specific sub-projects should provide detailed (itemized) cost estimates for all RAP activities, including allowances for inflation, population growth, and other contingencies; timetable for expenditures; sources of funds; and arrangements for timely flow of funds. These should include other fiduciary arrangements consistent with the rest of the project governing financial management and procurement. Monitoring and evaluation: Arrangements for monitoring of RAP activities by the implementing agency, and the independent monitoring of these activities, should be included in the RAP section on monitoring and evaluation. The final evaluation should be done by an independent monitor or agency to measure RAP outcomes and impacts on PAPs’ livelihood and living conditions. The World Bank has examples of performance monitoring indicators to measure inputs, outputs, and outcomes for RAP activities; involvement of PAPS in the monitoring process; evaluation of the impact of RAP activities over a reasonable period after resettlement and compensation, and using the results of RAP impact monitoring to guide subsequent implementation. Page 61 of 88 Annex 3: Sample Grievance and Resolution Form Name (Filer of Complaint): __________________________________ ID Number: __________________________________ (PAPs ID number) Contact Information : __________________________________ (Village ; mobile phone) Nature of Grievance or Complaint: _____________________________________________________________________________________ _____________________________________________________________________________________ Date Individuals Contacted Summary of Discussion ____________ __________________ ___________________________ Signature_______________________ Date: ____________ Signed (Filer of Complaint): ______________________________________ Name of Person Filing Complaint :__________________________( if different from Filer) Position or Relationship to Filer: __________________________________ Review/Resolution Date of Conciliation Session: ______________________________________ Was Filer Present? : Yes No Was field verification of complaint conducted? Yes No Findings of field investigation: _____________________________________________________________________________________ _____________________________________________________________________________________ Summary of Conciliation Session Discussion: _____________________________________________________________________________________ _____________________________________________________________________________________ Issues _____________________________________________________________________________ Was agreement reached on the issues? Yes No If agreement was reached, detail the agreement below: If agreement was not reached, specify the points of disagreement below: ____________________________________________________________________________________ Signed (Conciliator): ___________________________ Signed (Filer): ________________ Signed: ___________________________ Independent Observer Date: ___________________________ Page 62 of 88 Annex 4: Sample Table of Contents for Consultation Reports 1.0 Introduction. 1.1 Project Description 1.2 Applicable Laws, Regulations, and Policies to Public Engagement 1.3 Project Lenders 2.0 Stakeholder Analysis 2.1 Areas of Influence/Stakeholders 2.2 Description of Stakeholders 3.0 Stakeholder Engagement 3.1 Previous Consultation Activities 3.2 Implemented Community Engagement Activities 3.3 Project Sponsor’s Community Engagement Plan 3.3.1 Phase 1 – Initial Stakeholder Consultation 3.3.2 Phase 2 – Release of the SEA Terms of Reference and Draft PCDP 3.3.3 Phase 3 – Release of SEA Consultation Summary Report 4.0 Summary of Key Issues 5.0 Future Consultation Events 5.1 Phase 4 – Release of the SEA Report and Action Plans 5.2 Phase 5 – RCDAP Planning Consultation 5.3 Phase 6 - Ongoing Project Communication 6.0 Disclosure Plan Tables Table 2.1: Consultation Activity Summary Table 3.1: Initial Government Agency Consultations Table 3.2: Summary of NGO Meetings Table 3.3: Sub-County Committee Composition Table 3.4: Summary of Community Discussions Table 3.5: Local Community Comments Table 4.1: Summary of Key Issues and Responses Table 5.1: Summary of Future Consultation Activities per Stakeholder Group TEMPLATE Table on Consultation Activity Summary Location and Meeting Attendees Discussion Summary Communities Dates Represented Example: Page 63 of 88 Annex 5: Glossary of Terms Census A field survey carried out to identify and determine the number of Project Affected Persons (PAPs) or Displaced Persons (DPs) as a result of land acquisition and related impacts. The census provides the basic information necessary for determining eligibility for compensation, resettlement, and other measures emanating from consultations with affected communities and the local government institutions. Compensation The payment in kind, cash or other assets given in exchange for the acquisition of land including fixed assets, is called compensation. These include other impacts resulting from activities to rehabilitate or cushion the impacts from displacement. Cutoff Date The cut-off date is the date of commencement of the census of PAPs or DPs within the EASP program area boundaries. This is the date on and beyond which any person whose land is occupied for EASP program, will not be eligible for compensation. Grievance The RPF contains a grievance mechanism based on policies and procedures that are Mechanism designed to ensure that the complaints or disputes about any aspect of the land acquisition, compensation, resettlement, and rehabilitation process, etc. are being addressed. This mechanism includes a procedure for filing of complaints and a process for dispute resolution within an acceptable time period. Implementation The RPF contains an implementation schedule that outlines the time frame for Schedule planning, implementation, and monitoring and evaluation of the RAPs for sub- projects, if applicable. Land Land refers to all types of agricultural and/or non-agricultural land and any structures thereon whether temporary or permanent and which may be acquired by the project. Land Land acquisition means the possession of or alienation of land, buildings, or other Acquisition assets thereon for purposes of the project. Project Project affected persons (PAPs) or Displaced Persons (DPs) are persons affected by Affected land and other assets loss as a result of EASP activities. These person(s) are Persons (PAPs) affected because they may lose, be denied, or be restricted access to economic or Displaced assets; lose shelter, income sources, or means of livelihood. These persons are Persons (DPs) affected whether or not they will move to another location. Most often, the term DPs applies to those who are physically relocated. These people may have their: standard of living adversely affected, whether or not the Displaced Person will move to another location ; lose right, title, interest in any houses, land (including premises, agricultural and grazing land) or any other fixed or movable assets acquired or possessed, lose access to productive assets or any means of livelihood. Project Impacts Impacts on the people living and working in the affected areas of the project, including the surrounding and host communities are assessed as part of the overall evaluation of the project. Page 64 of 88 Project Some projects make use of project implementing units (PIUs), which are generally Implementing separate units within the project recipient’s agency. The PIU is often composed of Unit (PIU) full time staff devoted to implementing the project, and have been encouraged to have separate teams with environment and social specialists who can carry out the activities, for example, as outlined in the RPF or RAP. Rehabilitation Rehabilitation assistance is the provision of development assistance in addition to Assistance compensation such as livelihood support, credit facilities, training, or job opportunities, needed to assist PAPs or DPs restore their livelihoods. Replacement Replacement cost refers to the amount sufficient to cover full recovery of lost Cost assets and related transaction costs. The cost should be based on Market rate (commercial rate) according to Tanzanian laws for sale of land or property. It is normally calculated based on a willing buyer-willing seller basis, but also applies in Tanzania to acceptable market valuation or from an assessment from the Land Commission and government valuer. Resettlement The RAP is a resettlement instrument (document) to be prepared when sub-project Action Plan locations are identified. In such cases, land acquisition leads to physical (RAP) displacement of persons, and/or loss of shelter, and /or loss of livelihoods and/or loss, denial or restriction of access to economic resources. RAPs are prepared by the implementing agency and contain specific and legal binding requirements to resettle and compensate the affected people before project implementation. Resettlement Resettlement assistance refers to activities that are usually provided during, and Assistance immediately after, relocation, such as moving allowances, residential housing, or rentals or other assistance to make the transition smoother for affected households. Resettlement The RPF is an instrument to be used throughout the project’s implementation. The Policy RPF sets out the objectives and principles, organizational arrangements, and Framework funding mechanisms for any resettlement, that may be necessary during (RPF) implementation. The RPF guides the preparation of Resettlement Action Plans (RAPs), as needed, for sub-projects. Rights and Rights and entitlements are defined for PAPs and DPs (with the cut-off date) and Entitlements cover those losing businesses, jobs, and income. These include options for land-for- land or cash compensation. Options regarding community and individual resettlement, and provisions and entitlements to be provided for each affected community or household will be determined and explained, usually in an entitlement matrix. Witness NGO Some RPFs refer to a witness NGO or an independent monitor that can be or Independent contracted to observe the compensation process and provide an independent Monitor assessment of the quality of the process. These are usually NGOs or other agencies that are not directly involved in the project and have a reputation for independence and integrity. Page 65 of 88 Annex 6: Relevant Tanzanian Laws Property Rights and Land Rights Law / Regulation The Constitution provides for the protection of the rights and interest of Constitution (1977) citizens in matters concerning their property and acquisition. Under article 24 (1), every person is entitled to own property, and has a right to the protection of his property held in accordance with the law. Sub-article (2) prescribes that it is unlawful for any person to be deprived of property for any purposes without the authority of law, which makes provision for fair and adequate compensation. The National Land policy provides guidance and directives on land National Land Policy ownership and tenure rights and taking of land and other land based assets. (1996) The policy stipulates organization and procedures for valuing assets and delivery of compensation. The overall aim is to promote and ensure a secure land tenure system in Tanzania that protects the rights in land for all its citizen. The following are the basic land policy tenets:  All land in Tanzania is public land vested in the President as trustee on behalf of all citizen;  Land has value;  The rights and interest of citizens in land shall not be taken without due process of law; and  Full, fair and prompt compensation shall be paid when land is acquired. Land tenure and ownership in Tanzania is governed by these statutes as well National Land Act (No. 4 as the 1977 Constitution of the United Republic of Tanzania, (as amended) of 1999), Village Land Act Land in Tanzania is owned by the state. Public land in Tanzania is either (No.5 of 1999), Land general land or village land or reserved land. Socio-economic activities are Regulations 2001 permitted on general/village land and not permitted or restricted in land Subsidiary Legislation, reserved for national parks, protected areas and forest reserves. Land Acquisition Act (1967), Land Ordinance Tanzania has a dual system of land tenure: customary and statutory rights of (1923 Cap. 113) and Town occupancy. Tenure rights to land can be held by individuals and by and Country Planning communities. Holdings of individuals can be (i) by leasehold right of Ordinance (1956 Cap. occupancy for varying periods e.g. 33, 66, or 99 years which must be 378). confirmed by a certificate of occupancy; (ii) by customary rights of occupancy that must be confirmed by a certificate of Customary Right of Occupancy (Hati ya Ardhi ya Mila) and have no term limit. Communities (Villages) are allowed to hold land and to manage it, although they do not formally own the land. The Land Acquisition Act further empowers authorized Government officials Land Acquisition Act (which is applicable to MJCA, PO-PSM and the Judiciary) to investigate the (1967) land in any locality for its possible acquisition for any public purpose. The Page 66 of 88 Property Rights and Land Rights Law / Regulation authorized person is allowed to enter upon and survey and take levels of any land in such locality; to do all other acts necessary to ascertain whether the land is adapted for such purpose; and to clear, set out and mark the boundaries of the land proposed to be taken and the intended line of the work (if any) proposed to be made thereon. Tanzania laws indicate that market value should be used as basis for Regulation 3 of the Land valuation of land and properties. The laws provide for practical guidelines on (Assessment of the Value assessment of compensation. The full and fair compensation is only assessed of Land for by including all components of land quality. Presently in assessing the value Compensation) of the unexhausted improvements for compensation purposes, the law Regulations, 2001 and Part emphasizes that the value should be the price that which the said IlIl of the Village Land improvements can fetch if sold in the open market. But this in normal Regulations, 2002 circumstances is lower than the replacement value but higher than the initial construction cost of the said improvements. The Acts stipulate in detail functions of District/Urban councils. Issues of Local Government land are included as objectives of functions and therefore part of the (District Authorities) Act mandates of local government in their respective areas. No. 7, 1982 and Local Government (Urban Authorities) Act No. 8, 1982 The grievance procedure will be simple, administered as far as possible at the Cited in Resettlement local level to facilitate access, flexible and open to various proofs taking into Policy Framework, cognizance of the fact most people are illiterate and poor requiring a speedy, Tanzania Accountability, just and fair resolution of their grievances. The Local Government Transparency and Integrity Authorities not being a party to the contracts would be the best office to Project (ATIP), October receive handle and rule on disputes. Failure of the Councils to settle the (2005) disputes, the grievances concerning non-fulfillment of contracts, levels of compensation, or seizure of assets without compensation will be addressed to the existing local courts system of administration of justice in the Districts. Local NGO's will be engaged by the Designated Sector Environmental Coordinators to mediate disputes. If the complainant's claim is rejected, then the matter will be brought before the Land Tribunals and/or the local courts for settlement. If the matter cannot be settled by the local courts and/or the District Land Tribunals, the matter will go the High Court for resolution. The High Court of Tanzania will be the highest appellate "judge" in this system. The decision of the High Court would be final and all effort should be made to ensure decisions are reached within a full growing season after the complaint is lodged. Page 67 of 88 Annex 7: Summary of Stakeholder’s Comments, Concerns and Recommendations Name of stakeholder Comments, concerns and recommendations 1. Surface and Marine  Littering and sand mining in the railway reserve areas Transport Regulatory  Flash flooding at Gulwe – Msagali - Igandu area. Authority (SUMATRA)  Overgrown grass on and along the rail track due to poor maintenance.  Town buses and motorcycle taxi using the railway crossover as a station.  Weakening of the rail track by removal of ballast caused by herds crossing at undesignated crossings  Carrying out safety awareness campaigns throughout the railway line 2. Ilala Municipal Council,  There is a possibility for resettlement in Dar es Salaam Dar es Salaam (especially in Buguruni, Vingunguti and Kamata), Morogoro, Dodoma and Tabora towns where rail passes.  Fair compensation should be paid and removal of structures should be given at least six months before commencement of project.  Littering in railway reserve areas by passengers, vendors and railway side communities is a serious security and health concern especially from Dar es Salaam main station to Vingunguti sub-station. 3. Kilosa District Council  Cattle crossing destroy the rail terrace by removing ballast.  Proper cattle crossing system should be constructed and mechanisms for their good use be put in place.  Killing of livestock and cyclists at railway crossings is an issue of concern especially in the areas between Kimamba and Kilosa where there are several livestock that must cross the railway track in search for pasture and water.  Under railway track crossings should be designed for livestock, bicycles, and motorcycles. Proper signs and markers should also be appropriated placed.  Encroachment is not an issue because encroachers are aware that they are illegally occupying the rail reserve areas. 4. Dodoma Municipal  Notification should be posted to passengers prior to the Council commencement of rehabilitation works.  Local people should be given priority for employment during rehab works.  Proper placing of railway safety signals to reduce accidents. 5. Railway Side Local  Camping sites should be constructed away from people’s Communities settlement to reduce chances for direct interactions so as to reduce chances for spreading of sexual transmitted diseases Consultative meetings with the (STDs) including HIV/AIDS. railway side communities and vendors of Dar es Salaam,  Deteriorating environmental quality due to the pilling up of Page 68 of 88 Name of stakeholder Comments, concerns and recommendations Morogoro, Dodoma, Tabora, garbage which leads to the diseases outbreak to the railway Pugu, Vingunguti, Gongo la side communities. mboto-Kampala and Gulwe, were done through personal  Project will provide jobs to the people either directly casual interview due to the nature of labourers or indirectly through trading with workers and rail scattered settlement of railway users/ passengers during and after construction. Local people side communities and vendors. should be given priority by contractors in employing temporary/ casual labourers.  Passenger’s latrines, waiting lounges and dustbin should be constructed to reduce environmental pollution in the railway stations.  Railway signs and markers at road-railway crossings should be clearly shown in order to reduce accidents.  Majority of communities lacks basic education on environmental awareness and public education issues related to health and hygiene.  Where appropriate, local people should be compensated for any loss of property and assets that might be caused by the proposed project.  Mechanisms should be put in place to deal with people involved in vandalizing railway infrastructure e.g. stealing of iron/steel slippers to sale as scrappers.  Some communities like Kidete ward will have transport problems during the rehabilitation of the railway thus; roads might be needed to be constructed within the railway reserve.  Contractors who will be awarded rehabilitation tenders should be reminded of their corporate social responsibility by supporting railway side community developmental projects in education, health, road, water etc.  Construction of appropriate crossings for livestock and cyclist in order to reduce accidents. 6. Civil Society  Improved railway services might result into population Organizations (CSOs) pressure in the railway side villages in which farmers and retailers/vendors will be attracted to establish their settlement Some Non-Governmental along the railway line. This will contribute to the expansion of Organizations (NGOs) and market and some villages will become trading centers due to Community Based Organization (CBOs) dealing the frequent movement of goods and passenger train. with HIV/AIDS and Legal  No fixed garbage dumping points in passenger train at main Aids, Material and food and substations inviting for haphazard disposal of the same. production, education, poverty  Project will be an important source employment. alleviation, environmental and health sanitation issues were  The project might provide chances for the spread of STDs and consulted in Ilala, Kinondoni, unwanted pregnancies in areas where contractor’s camps will Morogoro, Tabora, Dodoma, be located. Uyui and Kahama.  Improved railway services will minimize road deterioration and jams caused by light and heavy trucks. Page 69 of 88 Name of stakeholder Comments, concerns and recommendations  Contractors should be advised of taking appropriate environmental protection measures in areas where there are rivers and forest.  HIV/AIDS awareness campaigns should be provided to railway workers and railway side communities during the implementation of the project.  Railway side communities should be empowered through entrepreneurship skills so as to take advantage of improved railway services.  Provision of health services in passenger train and at railway stations should be improved. 7. TLR Workers and  Encroachment is an issue of concern. Management  Encroachment due to urban planning and development e.g. in Dodoma where the Capital Development Authority (CDA) TRL workers at Dar es have taken land which originally belonged to railway reserve. Salaam, Mpiji, Pugu, Ruvu, Manyoni, Ngerengere,  All station premises should be strongly fenced to discourage Karangas, Morogoro, Kilosa, encroachment and free movement. Kidete, Gulwe, Dodoma, Tura,  TRL dispensaries are hardly functioning. Nyahua, Tabora and Isaka  Poor waiting lounges, the existing ones in bad condition. stations were consulted.  Clogging of drainages during rainy season leading to spread of malaria.  No adequate security in the trains stations leading to vandalism and theft cases.  Farming in the mountainous areas in Gulwe causes siltation on the railway terrace which results into flash flooding.  Planting trees and grass in the mountainous areas to reduce soil erosion and educating people about the disadvantages of farming on the mountain area.  Accidents at railway crossings. Placing of appropriate signs and markers plus cleaning of railway reserve around the crossings could be a solution. 8. Railway Police Officers  Prohibit any human activities within the railway reserve to reduce accidents caused by obscured visibility.  Demarcation of the railway reserves.  Improve signal system. 9. RAHCO Management  Preparations are underway to address the problem of encroachment by observing applicable national guidelines and regulations. Page 70 of 88 Name of stakeholder Comments, concerns and recommendations Summary of Stakeholder Consultations 1. Perceived Benefits from the Proposed Project 1. The proposed project will create employment for many people during the construction phase. 2. Reliable and efficient railway services 3. Reduced travel time and costs. 4. Improved travel safety and comfort. 5. Increased economic growth: Improving the railway services will increase and spark and promote economic growth in Tanzania and neighboring countries. 6. Improve access to social services. 7. Increased land value: improved railway services will increase land value in the impact areas and modify its use and occupation patterns along the central railway line. The project area could be attractive to big investors. 8. The project will increase the life span of trunk roads as improved railway services could discourage many traders from using road transport. 2. Key Suggestions and Recommendations for Consideration 1. Improvement of the working conditions for TRL workers. 2. The railway reserve should be clearly demarcated with beacons. 3. During the rehabilitation the priority for employment opportunities should be given to the local people. 4. Camping site should be constructed away from peoples settlement this will reduce at least rate of spreading of sexual transmitted diseases like HIV/AIDS that will be caused by peoples interactions. 5. Improve health and safety in passenger train and with railway station premises. 6. HIV/AIDS awareness campaigns should be done during project implementation. 7. Police railway station especially in Isaka should be rehabilitated and improved; in the sense that Isaka is inland port and expected to be important trading centre in the near future especially after the accomplishment of the project. 8. Encroachments into the railway reserve have to be tackled. 9. All stations should be fenced and only passengers will be allowed to enter in the station, this will reduce vandalism and theft cases. Page 71 of 88 Annex 8: List of stakeholders consulted: MDAs Annex 9: List of stakeholders consulted: Local Government Authorities Page 72 of 88 Page 73 of 88 Annex 10: List of stakeholders consulted: Railway Side Communities Page 74 of 88 Page 75 of 88 Page 76 of 88 Page 77 of 88 Page 78 of 88 Page 79 of 88 Page 80 of 88 Page 81 of 88 Page 82 of 88 Page 83 of 88 Annex 11: List of stakeholders consulted: Civil Society Organizations Annex 12: List of stakeholders consulted: TRL Workers Page 84 of 88 Page 85 of 88 Page 86 of 88 Annex 13: List of stakeholders consulted: RAHCO Management Page 87 of 88