PROCUREMENT PLAN (Textual Part)
Project information: Dominican Republic
DISTRIBUTION GRID MODERNIZATION AND LOSS REDUCTION PROJECT
P147277
Project Implementation agency: CDEEE
Date of the Procurement Plan: 27-8-18
Period covered by this Procurement Plan:12 months


Preamble

In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers”
(July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in
Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and
conduct all procurement transactions for the Project.

This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan
for the Project. The following conditions apply to all procurement activities in the Procurement
Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the
Procurement Regulations are set forth in STEP.

The Bank’s Standard Procurement Documents: shall be used for all contracts subject to
international competitive procurement and those contracts as specified in the Procurement Plan
tables in STEP.



Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: “Not
Applicable”
Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement
Regulations – “Not Applicable”
Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods
and Works). Specify for each
     Goods: is applicable for those contracts identified in the Procurement Plan tables;
     Works: is applicable for those contracts identified in the Procurement Plan tables
PROCUREMENT
                                Dominican Republic : Distribution Grid Modernization and Loss Reduction Project
PLAN
General Information
Country:                        Dominican Republic                            Bank’s Approval Date of the Original Procurement Plan:                 2018-08-27
                                                                                                                                         2020-03-17
                                                                              Revised Plan Date(s): (comma delineated, leave blank if none)
Project ID:                     P147277                                       GPN Date:
Project Name:                   Distribution Grid Modernization and Loss Reduction Project
Loan / Credit No:               IBRD / 85630
Executing Agency(ies): Dominican Corporation of State Power Companies




WORKS
                                                                                                                                                                                                                                                                                                                                                                               Bid Evaluation
Activity Reference No. /                                                                                                                                                                                                                                                      Draft Bidding
                                Loan / Credit                                                                      Market         Procurement        Prequalification    Estimated        Actual Amount        Process      Draft Pre-qualification    Prequalification                             Specific Procurement      Bidding Documents   Proposal Submission /          Report and
        Description                                      Component               Review Type        Method                                                                                                                                                                     Document /                                                                                                               Signed Contract         Contract Completion
                                      No.                                                                         Approach           Process              (Y/N)         Amount (US$)          (US$)            Status            Documents            Evaluation Report                              Notice / Invitation          as Issued        Opening / Minutes        Recommendation for
                                                                                                                                                                                                                                                                              Justification
                                                                                                                                                                                                                                                                                                                                                                                    Award
                                                                                                                                                                                                                             Planned      Actual      Planned    Actual   Planned       Actual      Planned       Actual      Planned    Actual    Planned      Actual      Planned       Actual      Planned       Actual      Planned      Actual


                                                Rehabilitation of Selected
 BO-1-1 / bo.1.1 Proyecto de
                                                Distribution Circuits and
Rehabilitacion de Circuitos
                                                Upgrading of Metering                          Solicitud de   Open -            Single Stage - One
de media y baja tension         IBRD / 85630                                  Previa                                                                                     101,208,000.00      94,636,401.91   Firmado                                                      2017-08-09                2017-08-09                                    2017-11-09   2017-11-09   2018-05-04   2018-09-10   2018-07-18   2018-08-02   2019-09-21
                                                Systems - Implementation of                    ofertas        International     Envelope
(EDESUR-EDENORTE-
                                                Environmental Manag ement
EDEESTE)
                                                System




                                                Rehabilitation of Selected
 BO-1-3 / bo.1.3 Adecuacion
                                                Distribution Circuits and
de un sitio actual de acopio
                                                Upgrading of Metering                          Solicitud de                     Single Stage - One                                                           Ejecución
Residuos (EDESUR-               IBRD / 85630                                  Posterior                       Limited                                                       150,000.00                0.00                                                                                          2018-11-09                                                                                        2018-12-10                2019-02-08
                                                Systems - Implementation of                    cotizaciones                     Envelope                                                                     pendiente
EDENORTE-EDEESTE) -
                                                Environmental Manag ement
PMAA
                                                System




 BO-3-1 / bo.3.1 Adecuacion
                                                Commercial Management
Oficinas Comerciales Tipo A
                                                and Project Management,
en la Zona de Influencia de
                                                Monitoring and Evaluation
los Circuitos de Edesur)                                                                       Solicitud de                     Single Stage - One                                                           Ejecución
                                IBRD / 85630    of the Distribution Grid      Posterior                       Limited                                                       308,672.00                0.00                                                                                          2017-11-20                                                                                        2018-02-03                2018-04-04
(Contempla mobiliario,                                                                         cotizaciones                     Envelope                                                                     pendiente
                                                Modernization and Electri
sistema de vigilancia,
                                                cal Losses Reduction
deteccion de incendio) -
                                                Program
Comercial




                                                Rehabilitation of Selected
 BO-1-2 / bo.1.2.Construccion                   Distribution Circuits and
de tres puntos verdes                           Upgrading of Metering                          Solicitud de                     Single Stage - One
                                IBRD / 85630                                  Previa                          Open - National                                               442,100.00         465,645.18    En ejecución                                                 2019-08-22   2019-09-17   2019-08-27   2019-09-19                       2019-09-26   2019-10-31   2019-10-26   2020-01-16   2019-11-15                2020-01-14
(EDESUR-EDENORTE-                               Systems - Implementation of                    ofertas                          Envelope
EDEESTE) - PMAA                                 Environmental Manag ement
                                                System




                                                Commercial Management
                                                and Project Management,
 BO-3-2 / Adecuación de
                                                Monitoring and Evaluation
Ocho (8) Oficinas                                                                              Solicitud de                     Single Stage - One
                                IBRD / 85630    of the Distribution Grid      Posterior                       Open - National                                              1,056,619.00        359,481.60    Firmado                                                      2019-05-15   2019-07-25   2019-05-20                                    2019-07-01   2019-08-29   2019-07-16   2019-10-15   2019-08-14   2019-12-18   2019-12-12
Comerciales (Edesur (3) y                                                                      ofertas                          Envelope
                                                Modernization and Electri
Edenorte (5))
                                                cal Losses Reduction
                                                Program




                                                Commercial Management
 BO-3-2-A / Adecuaciones de                     and Project Management,
oficinas comerciales de                         Monitoring and Evaluation
                                                                                               Solicitud de                     Single Stage - One                                                           Ejecución
Edesur (San Cristóbal 1er y     IBRD / 85630    of the Distribution Grid      Posterior                       Limited                                                       341,012.00                0.00                                                                                          2019-12-26                                                                                        2020-02-14                2020-04-14
                                                                                               cotizaciones                     Envelope                                                                     pendiente
3er Piso, Patio Colombia y                      Modernization and Electri
San Cristóbal Norte)                            cal Losses Reduction
                                                Program




 BO.2.1 / Adecuación Terrero
para ubicación de furgón                        Citizen Engagement and                         Solicitud de                     Single Stage - One                                                           Ejecución
                                IBRD / 85630                                  Posterior                       Limited                                                          4,500.00               0.00                                                                                          2020-04-16                                                                                        2020-05-14                2020-05-29
para almacenamiento                             Community Participation                        cotizaciones                     Envelope                                                                     pendiente
temporal de la UEP/CDEEE.




                                                                                                                                                                                                                                 Page 1
GOODS
                                                                                                                                                                                                                                                                                                                                                                     Bid Evaluation
Activity Reference No. /                                                                                                                                                                                                                                                  Draft Bidding
                                Loan / Credit                                                                      Market         Procurement        Prequalification    Estimated       Actual Amount        Process   Draft Pre-qualification    Prequalification                         Specific Procurement      Bidding Documents   Proposal Submission /        Report and
        Description                                      Component               Review Type        Method                                                                                                                                                                 Document /                                                                                                     Signed Contract         Contract Completion
                                      No.                                                                         Approach           Process              (Y/N)         Amount (US$)         (US$)            Status         Documents            Evaluation Report                          Notice / Invitation          as Issued        Opening / Minutes      Recommendation for
                                                                                                                                                                                                                                                                          Justification
                                                                                                                                                                                                                                                                                                                                                                          Award
                                                                                                                                                                                                                         Planned      Actual      Planned    Actual   Planned      Actual   Planned       Actual      Planned    Actual    Planned     Actual     Planned      Actual   Planned       Actual      Planned       Actual


 B-1-1 / b.1.1 Adquisición de                   Rehabilitation of Selected
Kit para Analisis Cualitativo                   Distribution Circuits and
- Subprograma de manejo y                       Upgrading of Metering                          Solicitud de                     Single Stage - One
                                IBRD / 85630                                  Posterior                       Limited                                                        24,000.00               0.00   Cancelado                                                                       2018-11-03                                                                                  2018-11-26                2018-12-26
disposición de aceite con                       Systems - Implementation of                    cotizaciones                     Envelope
PCB - Calidad Ambiental -                       Environmental Manag ement
PMAA                                            System




                                                Rehabilitation of Selected
                                                Distribution Circuits and
 B-1-2 / b.1.2 Equipo de
                                                Upgrading of Metering                          Solicitud de                     Single Stage - One
campo, tabletas, seguridad y    IBRD / 85630                                  Posterior                       Limited                                                        35,000.00         8,601.49     Firmado                                                                         2018-08-17   2019-01-29                                                                     2018-09-04   2019-02-28   2018-10-04   2019-05-29
                                                Systems - Implementation of                    cotizaciones                     Envelope
manejo ambiental - PMAA
                                                Environmental Manag ement
                                                System




                                                Rehabilitation of Selected
 B-1-3 / b.1.3 Adq. Vehículos                   Distribution Circuits and
utilitarios para las Unidades                   Upgrading of Metering                          Solicitud de                     Single Stage - One                                                          Ejecución
                                IBRD / 85630                                  Previa                          Open - National                                               115,000.00               0.00                                                             2017-04-03            2017-04-18                                    2017-05-18              2017-05-28            2017-06-17                2017-08-01
ambientales                                     Systems - Implementation of                    ofertas                          Envelope                                                                    pendiente
UEP/CDEEE/EDES - PMAA                           Environmental Manag ement
                                                System




 B-2-1 / b.2.1 Adquisicion de
Carpetas para los Comites
                                                Citizen Engagement and                         Solicitud de                     Single Stage - One                                                          Ejecución
de Seguimiento de las Obras IBRD / 85630                                      Posterior                       Limited                                                        23,445.00               0.00                                                                                   2018-07-04                                                                                  2018-07-28                2018-08-27
                                                Community Participation                        cotizaciones                     Envelope                                                                    pendiente
(COSE) (EDESUR-
EDENORTE-EDEESTE)




 B-2-2 / b.2.2. Edesur:
Gastos de Gestion Social,
tales como: Actividades de
Solidaridad Social en
                                                Citizen Engagement and                         Solicitud de                     Single Stage - One                                                          Ejecución
Comunidades Intervenidas        IBRD / 85630                                  Posterior                       Limited                                                        24,161.00               0.00                                                                                   2019-04-04                                                                                  2019-04-28                2019-05-28
                                                Community Participation                        cotizaciones                     Envelope                                                                    pendiente
(Entrega de articulos
deportivos, uniformes,
equipamiento para centros
comunitarios, etc.)




 B-2-3 / b.2.3. Edenorte:
Gastos de Gestion Social,
tales como: Actividades de
Solidaridad Social en
                                                Citizen Engagement and                         Solicitud de                     Single Stage - One                                                          Ejecución
Comunidades Intervenidas        IBRD / 85630                                  Posterior                       Limited                                                        25,679.00               0.00                                                                                   2019-04-04                                                                                  2019-04-28                2019-05-28
                                                Community Participation                        cotizaciones                     Envelope                                                                    pendiente
(Entrega de articulos
deportivos, uniformes,
equipamiento para centros
comunitarios, etc.)




 B-2-4 / b.2.4. Edeeste:
Gastos de Gestion Social,
tales como: Actividades de
Solidaridad Social en
                                                Citizen Engagement and                         Solicitud de                     Single Stage - One                                                          Ejecución
Comunidades Intervenidas        IBRD / 85630                                  Posterior                       Limited                                                        15,285.00               0.00                                                                                   2019-04-04                                                                                  2019-04-28                2019-05-28
                                                Community Participation                        cotizaciones                     Envelope                                                                    pendiente
(Entrega de articulos
deportivos, uniformes,
equipamiento para centros
comunitarios, etc.)




 B-2-5 / b.2.5 Adquisicion
Vehiculos para uso de la
                                                Citizen Engagement and                         Solicitud de                     Single Stage - One                                                          Ejecución
Gestion Social de las           IBRD / 85630                                  Previa                          Open - National                                               425,000.00               0.00                                                             2017-05-12            2017-05-22                                    2017-07-03              2017-08-11            2017-09-05                2017-09-30
                                                Community Participation                        ofertas                          Envelope                                                                    pendiente
distribuidoras (EDESUR-
EDENORTE-EDEESTE)




                                                                                                                                                                                                                             Page 2
 B-2-6 / b.2.6 Adquisicion de
bombillas de bajo consumo
                                                Citizen Engagement and                  Solicitud de                     Single Stage - One
para las distribuidoras          IBRD / 85630                               Posterior                  Open - National                         207,600.00    153,447.20   En ejecución            2018-08-06   2019-10-02   2018-08-08   2019-10-09   2018-09-07   2019-11-14   2018-09-17   2019-12-20   2018-09-29                2018-12-18
                                                Community Participation                 ofertas                          Envelope
(EDESUR-EDENORTE-
EDEESTE)




 B-2-7 / b.2.7 Adqusicion de
materiales Impresos
(Publicitarios, didacticos y                    Citizen Engagement and                  Solicitud de                     Single Stage - One                               Ejecución
                                 IBRD / 85630                               Posterior                  Limited                                 112,307.00          0.00                                                     2018-08-07                                                                    2018-09-01                2018-10-16
brochures) para las                             Community Participation                 cotizaciones                     Envelope                                         pendiente
distribuidoras (EDESUR-
EDENORTE- EDEESTE)




                                                Commercial Management
                                                and Project Management,
 B-3-1 / b.3.1. Equipamiento                    Monitoring and Evaluation
                                                                                        Solicitud de   Open -            Single Stage - One                               Ejecución
e Implementacion                 IBRD / 85630   of the Distribution Grid    Previa                                                            3,500,000.00         0.00                           2019-01-15                2019-01-25                2019-03-08                2019-03-28                2019-04-27                2019-06-26
                                                                                        ofertas        International     Envelope                                         pendiente
DataCenter                                      Modernization and Electri
                                                cal Losses Reduction
                                                Program




                                                Commercial Management
 B-3-2 / b.3.2. Adquisicion                     and Project Management,
de vehiculos para realizar                      Monitoring and Evaluation
                                                                                        Solicitud de                     Single Stage - One                               Ejecución
visitas de supervision tecnica IBRD / 85630     of the Distribution Grid    Previa                     Open - National                         304,000.00          0.00                           2017-09-05                2017-09-10                2017-10-22                2017-11-21                2017-12-26                2018-06-24
                                                                                        ofertas                          Envelope                                         pendiente
a las zonas de las obras                        Modernization and Electri
(UEP-EDE)                                       cal Losses Reduction
                                                Program




 B-3-5-2 / b.3.5.2 Equipos
                                                Commercial Management
Informaticos para la
                                                and Project Management,
Adecuacion de oficina
                                                Monitoring and Evaluation
comercial tipo A, en la zona                                                            Solicitud de                     Single Stage - One                               Ejecución
                                 IBRD / 85630   of the Distribution Grid    Posterior                  Limited                                  56,758.00          0.00                                                     2018-02-06                                                                    2018-03-01                2018-03-22
de influencia de los circuitos                                                          cotizaciones                     Envelope                                         pendiente
                                                Modernization and Electri
de Edesur (Contempla la
                                                cal Losses Reduction
adquisicion de mobiliario) -
                                                Program
Comercial




 B-2-8 / Adq. Cámaras para
Premiación Concurso
                                                Citizen Engagement and                  Solicitud de                     Single Stage - One                               Ejecución
Fotografía Uso Racional de       IBRD / 85630                               Posterior                  Limited                                    4,000.00         0.00                                                     2019-01-24                                                                    2019-02-18                2019-03-20
                                                Community Participation                 cotizaciones                     Envelope                                         pendiente
Energía en Circuitos en el
Ámbito del Proyecto.




 B-2-10 / Adq. Placas de
Reconocimiento para líderes
                                                Citizen Engagement and                  Solicitud de                     Single Stage - One                               Ejecución
Comunitarios de los Comités      IBRD / 85630                               Posterior                  Limited                                    3,500.00         0.00                                                     2019-09-04                                                                    2019-09-23                2019-10-23
                                                Community Participation                 cotizaciones                     Envelope                                         pendiente
de Seguimiento de los
Circuitos Intervenidos.




 B-2-9 / Adq. de artículos
publicitarios para la                           Citizen Engagement and                  Solicitud de                     Single Stage - One
                                 IBRD / 85630                               Posterior                  Limited                                  30,000.00     12,144.18   Firmado                                           2018-10-24   2018-10-31                                                       2018-11-12   2018-11-16   2018-12-12
campaña del subcomponente                       Community Participation                 cotizaciones                     Envelope
de gestión ambiental




                                                Commercial Management
 B-3-9 / Adq de 3 Camiones                      and Project Management,
Tipo Carga, sin carga - 4                       Monitoring and Evaluation
                                                                                        Solicitud de                     Single Stage - One
Furgonetas - 2 Minibuses de IBRD / 85630        of the Distribution Grid    Posterior                  Open - National                         429,300.00    406,877.98   Firmado                 2019-04-30   2019-05-10   2019-05-05   2019-05-14   2019-06-04   2019-06-18   2019-06-19   2019-07-19   2019-07-11   2019-08-27   2019-08-25
                                                                                        ofertas                          Envelope
15 Pasajeros - y 4                              Modernization and Electri
Camionetas - para Edeeste.                      cal Losses Reduction
                                                Program




 B-3-4 / b.3.4. Adquisicion
de 4 oficinas comerciales                       Commercial Management
moviles (1 Edesur - 2                           and Project Management,
Edenorte - 1 Edeeste)                           Monitoring and Evaluation
                                                                                        Solicitud de                     Single Stage - One
(Incluye: Adquisicion de         IBRD / 85630   of the Distribution Grid    Posterior                  Open - National                         119,118.00          0.00   En ejecución            2018-09-19   2019-06-13   2018-09-24                2018-11-05                2018-12-05                2019-01-09                2019-03-10
                                                                                        ofertas                          Envelope
camion, mobiliario, equipos                     Modernization and Electri
de informaticos, equipo de                      cal Losses Reduction
sonido, senalizacion) -                         Program
Comercial




                                                                                                                                                                                         Page 3
                                               Commercial Management
                                               and Project Management,
                                               Monitoring and Evaluation
 B-3-10 / Adq de 6 Quioscos                                                              Solicitud de                     Single Stage - One
                                IBRD / 85630   of the Distribution Grid      Posterior                  Limited                                  49,800.00     24,003.56   En ejecución                                      2019-05-23   2019-06-12                                                       2019-06-16   2019-07-09   2019-07-31   2019-07-16
de Autopago para Edeeste                                                                 cotizaciones                     Envelope
                                               Modernization and Electri
                                               cal Losses Reduction
                                               Program




                                               Commercial Management
                                               and Project Management,
 B-3-3-A / Adq. de Licencias
                                               Monitoring and Evaluation
Adobe Acrobat Professional y                                                             Solicitud de                     Single Stage - One
                                IBRD / 85630   of the Distribution Grid      Posterior                  Limited                                    7,558.00     3,496.06   Finalizado                                        2019-05-01   2019-04-26                                                       2019-05-12   2019-05-08   2019-05-27   2019-05-16
Adobe Creative Cloud for                                                                 cotizaciones                     Envelope
                                               Modernization and Electri
Teams para la UEP.
                                               cal Losses Reduction
                                               Program




                                               Commercial Management
                                               and Project Management,
                                               Monitoring and Evaluation
 B-3-3-B / Adquisición de                                                                Solicitud de                     Single Stage - One
                                IBRD / 85630   of the Distribution Grid      Posterior                  Limited                                    1,000.00         0.00   En ejecución                                      2019-05-01   2019-04-25                                                       2019-05-17                2019-06-01
Trituradora para la UEP.                                                                 cotizaciones                     Envelope
                                               Modernization and Electri
                                               cal Losses Reduction
                                               Program




                                               Commercial Management
                                               and Project Management,
 B-3-3 / b.3.3. Adquisicion                    Monitoring and Evaluation
                                                                                         Solicitud de                     Single Stage - One                               Ejecución
de Equipos Informaticos para IBRD / 85630      of the Distribution Grid      Posterior                  Limited                                  36,442.00          0.00                                                     2018-02-10                                                                    2018-04-07                2018-06-06
                                                                                         cotizaciones                     Envelope                                         pendiente
la UEP                                         Modernization and Electri
                                               cal Losses Reduction
                                               Program




 B-3-5-1 / b.3.5.1 Adecuacion                  Commercial Management
de oficinas comerciales tipo                   and Project Management,
B, en la zona de influencia                    Monitoring and Evaluation
                                                                                         Solicitud de                     Single Stage - One
de los circuitos de Edenorte    IBRD / 85630   of the Distribution Grid      Posterior                  Open - National                         339,650.00          0.00   Cancelado               2018-10-29                2018-11-03                2018-12-03                2018-12-18                2019-01-07                2019-03-08
                                                                                         ofertas                          Envelope
y Edesur (Contempla la                         Modernization and Electri
adquisicion de mobiliario) -                   cal Losses Reduction
Comercial                                      Program




                                               Commercial Management
 B-3-7 / b.3.7.
                                               and Project Management,
Implementacion Sistema de
                                               Monitoring and Evaluation
Administracion de Turnos                                                                 Solicitud de                     Single Stage - One
                                IBRD / 85630   of the Distribution Grid      Posterior                  Limited                                  12,000.00          0.00   Cancelado                                         2018-08-13                                                                    2018-09-27                2018-10-27
(Computadoras, Software,                                                                 cotizaciones                     Envelope
                                               Modernization and Electri
Impresoras Pantalla de TV,
                                               cal Losses Reduction
Audio) - Comercial
                                               Program




                                               Commercial Management
 B-3-6-A / b.3.6. Adquisicion
                                               and Project Management,
de materiales para suplir
                                               Monitoring and Evaluation
Demanda Comercial y                                                                      Solicitud de   Open -            Single Stage - One
                                IBRD / 85630   of the Distribution Grid      Previa                                                            1,551,261.00   968,330.52   En ejecución            2019-04-22   2019-09-12   2019-04-27   2019-09-23   2019-06-08   2019-11-15   2019-06-23   2020-02-05   2019-07-22                2019-11-19
Mantenimiento (Medidores,                                                                ofertas        International     Envelope
                                               Modernization and Electri
acometidas, cajas, etc) -
                                               cal Losses Reduction
Comercial
                                               Program




                                               Rehabilitation of Selected
 B-1-2-A / Adq. 5 laptops                      Distribution Circuits and
para los técnicos y                            Upgrading of Metering                     Solicitud de                     Single Stage - One
                                IBRD / 85630                                 Posterior                  Limited                                    6,750.00     7,526.12   Finalizado                                        2019-08-28   2019-08-29                                                       2019-09-14   2019-09-30   2019-10-14   2019-11-05
coordinadores ambientales de                   Systems - Implementation of               cotizaciones                     Envelope
las EDE.                                       Environmental Manag ement
                                               System




 B-2-11 / Adq. 18 parantes
alusivos al Programa de                        Citizen Engagement and                    Solicitud de                     Single Stage - One                               Ejecución
                                IBRD / 85630                                 Posterior                  Limited                                    2,250.00         0.00                                                     2019-09-15                                                                    2019-10-02                2019-10-17
Rehabilitación de Redes                        Community Participation                   cotizaciones                     Envelope                                         pendiente
Eléctricas




 B-2-12 / B-2-12 Adq. 651
Collarines alusivos al                         Citizen Engagement and                    Solicitud de                     Single Stage - One                               Ejecución
                                IBRD / 85630                                 Posterior                  Limited                                    1,623.00         0.00                                                     2019-09-15                                                                    2019-10-14                2019-10-29
Programa de Rehabilitación                     Community Participation                   cotizaciones                     Envelope                                         pendiente
de Redes Eléctricas




                                                                                                                                                                                          Page 4
 B-2-13 / B-2-13 Adq. 47,250
cajitas de crayones para
                                                Citizen Engagement and                    Solicitud de                     Single Stage - One                       Ejecución
completivo de los libros de      IBRD / 85630                                 Posterior                  Limited                                 16,029.00   0.00                                                     2019-09-15                                          2019-10-16   2019-10-31
                                                Community Participation                   cotizaciones                     Envelope                                 pendiente
colorear sobre uso eficiente y
seguro de energía.




                                                Rehabilitation of Selected
 B-1-2-B / B-1-2-B Máscaras                     Distribution Circuits and
y filtros para el personal                      Upgrading of Metering                     Solicitud de                     Single Stage - One                       Ejecución
                                 IBRD / 85630                                 Posterior                  Limited                                  1,800.00   0.00                                                     2019-11-23                                          2019-12-10   2020-01-09
Gestión Ambiental de las                        Systems - Implementation of               cotizaciones                     Envelope                                 pendiente
EDE.                                            Environmental Manag ement
                                                System




                                                Rehabilitation of Selected
                                                Distribution Circuits and
 B-2-15 / B-2-15 Luminarias
                                                Upgrading of Metering                     Solicitud de                     Single Stage - One                       Ejecución
para los Ciruelitos              IBRD / 85630                                 Posterior                  Limited                                   700.00    0.00                                                     2019-11-25                                          2019-12-19   2020-01-18
                                                Systems - Implementation of               cotizaciones                     Envelope                                 pendiente
(Comunidad Edenorte)
                                                Environmental Manag ement
                                                System




 B-2-14 / Adq. 800 agendas
2020 del Programa de                            Citizen Engagement and                    Solicitud de                     Single Stage - One                       Ejecución
                                 IBRD / 85630                                 Posterior                  Limited                                 10,717.00   0.00                                                     2019-12-13                                          2020-01-01   2020-01-31
Rehabilitación de Redes                         Community Participation                   cotizaciones                     Envelope                                 pendiente
Eléctricas.




                                                Commercial Management
 B-3-11 / Adq. Equipos                          and Project Management,
técnologicos para oficinas de                   Monitoring and Evaluation
                                                                                          Solicitud de                     Single Stage - One
Edesur (San Cristóbal 1er y      IBRD / 85630   of the Distribution Grid      Posterior                  Open - National                        116,127.00   0.00   En ejecución            2019-12-27   2020-02-03   2020-01-03   2020-02-04   2020-02-02   2020-02-17   2020-03-03   2020-04-17
                                                                                          ofertas                          Envelope
3er Piso, Patio Colombia,                       Modernization and Electri
San Cristóbal Norte)                            cal Losses Reduction
                                                Program




                                                Commercial Management
                                                and Project Management,
 B-3-12 / Adq. Kiosco para                      Monitoring and Evaluation
                                                                                          Solicitud de                     Single Stage - One                       Ejecución
oficina Patio Colombia,          IBRD / 85630   of the Distribution Grid      Posterior                  Limited                                  4,730.00   0.00                                                     2020-03-08                                          2020-04-02   2020-04-17
                                                                                          cotizaciones                     Envelope                                 pendiente
Edesur                                          Modernization and Electri
                                                cal Losses Reduction
                                                Program




                                                Commercial Management
 B-3-13 / Adq. de
                                                and Project Management,
Señalizaciones de Mercadeo
                                                Monitoring and Evaluation
para Oficinas de Edesur                                                                   Solicitud de                     Single Stage - One                       Ejecución
                                 IBRD / 85630   of the Distribution Grid      Posterior                  Limited                                 25,198.00   0.00                                                     2020-03-08                                          2020-03-30   2020-04-29
(San Cristóbal 1er y 3er                                                                  cotizaciones                     Envelope                                 pendiente
                                                Modernization and Electri
piso, Patio Colombia y San
                                                cal Losses Reduction
Cristóbal Norte)
                                                Program




                                                Commercial Management
 B-3-14 / Adq. equipos de                       and Project Management,
comunicaciones oficinas de                      Monitoring and Evaluation
                                                                                          Adquisición                                                               Ejecución
Edesur (San Cristóbal 1er y      IBRD / 85630   of the Distribution Grid      Posterior                  Direct                                   9,985.00   0.00                           2020-03-06                2020-03-11                                          2020-03-23   2020-05-07
                                                                                          directa                                                                   pendiente
3er piso, Patio Colombia y                      Modernization and Electri
San Cristóbal Norte)                            cal Losses Reduction
                                                Program




                                                Commercial Management
 B-3-15 / Adq. de Licencias
                                                and Project Management,
de Software de Turnos Eflow
                                                Monitoring and Evaluation
para las oficinas de Edesur                                                               Adquisición                                                               Ejecución
                                 IBRD / 85630   of the Distribution Grid      Posterior                  Direct                                   8,510.00   0.00                           2020-03-06                2020-03-11                                          2020-03-23   2020-04-22
(San Cristóbal 1er y 3er                                                                  directa                                                                   pendiente
                                                Modernization and Electri
piso, Patio Colombia y San
                                                cal Losses Reduction
Cristóbal Norte)
                                                Program




                                                Commercial Management
 B-3-16 / Adq. Equipos para
                                                and Project Management,
seguridad y vigilancia de las
                                                Monitoring and Evaluation
oficinas de Edesur (San                                                                   Solicitud de                     Single Stage - One                       Ejecución
                                 IBRD / 85630   of the Distribution Grid      Posterior                  Limited                                 31,982.00   0.00                                                     2020-03-11                                          2020-04-08   2020-05-23
Cristóbal 1er y 3er, Patio                                                                cotizaciones                     Envelope                                 pendiente
                                                Modernization and Electri
Colombia y San Cristóbal
                                                cal Losses Reduction
Norte)
                                                Program




                                                                                                                                                                                   Page 5
                                                Commercial Management
                                                and Project Management,
                                                Monitoring and Evaluation
 B-3-8 / b.3.8 Armarios para                                                                   Solicitud de                   Single Stage - One
                                IBRD / 85630    of the Distribution Grid      Posterior                       Limited                                                      37,400.00               0.00   Cancelado                                                                              2018-11-03                                                                               2018-12-25            2019-01-09
area de Archivo - UEP                                                                          cotizaciones                   Envelope
                                                Modernization and Electri
                                                cal Losses Reduction
                                                Program




                                                Commercial Management
                                                and Project Management,
 B-3-8-A / Fabricación e                        Monitoring and Evaluation
                                                                                               Adquisición                                                                                                Ejecución
Instalacion de Archivos para    IBRD / 85630    of the Distribution Grid      Posterior                       Direct                                                       29,628.00               0.00                                                                2019-12-27                2019-12-30                                                                               2020-01-11            2020-02-10
                                                                                               directa                                                                                                    pendiente
UEP                                             Modernization and Electri
                                                cal Losses Reduction
                                                Program




                                                Rehabilitation of Selected
 B-1-1-A / Adq. de Kit para
                                                Distribution Circuits and
Análisis Cualitativo -
                                                Upgrading of Metering                          Adquisición
Subprograma de manejo y         IBRD / 85630                                  Posterior                       Direct                                                       20,000.00               0.00   En ejecución                                                 2019-12-26   2019-12-05   2019-12-31                                                                               2020-01-09            2020-02-08
                                                Systems - Implementation of                    directa
disposición de aceite con
                                                Environmental Manag ement
PCB .
                                                System




 B-2-16 / Adq. de Furgón
para almacenamiento                             Citizen Engagement and                         Solicitud de                   Single Stage - One                                                          Ejecución
                                IBRD / 85630                                  Posterior                       Limited                                                       5,200.00               0.00                                                                                          2020-03-27                                                                               2020-04-17            2020-06-16
temporal de bienes o                            Community Participation                        cotizaciones                   Envelope                                                                    pendiente
materiales UEP/CDEEE




 B-2-17 / Adquisición de
                                                Citizen Engagement and                         Solicitud de                   Single Stage - One                                                          Ejecución
Uniformes para personal de      IBRD / 85630                                  Posterior                       Limited                                                      31,293.00               0.00                                                                                          2020-03-27                                                                               2020-04-22            2020-06-21
                                                Community Participation                        cotizaciones                   Envelope                                                                    pendiente
gestión social de las EDE.




 B-3-17 / Adquisición de
mobiliario para el salón de                     Citizen Engagement and                         Solicitud de                   Single Stage - One                                                          Ejecución
                                IBRD / 85630                                  Posterior                       Limited                                                       9,260.00               0.00                                                                                          2020-03-27                                                                               2020-04-20            2020-05-20
reuniones (mesas, sillones y                    Community Participation                        cotizaciones                   Envelope                                                                    pendiente
credenza)




 B-2-18 / Adq. Materiales
para prácticas del programa
de formación de electricistas                   Citizen Engagement and                         Solicitud de                   Single Stage - One                                                          Ejecución
                                IBRD / 85630                                  Posterior                       Limited                                                      11,879.34               0.00                                                                                          2020-03-27                                                                               2020-04-23            2020-05-23
comunitarios (incluye                           Community Participation                        cotizaciones                   Envelope                                                                    pendiente
materiales eléctricos, tubos,
plywood para panales)




 B-2-19 / Adquisición de
Kits de herramientas para
                                                Citizen Engagement and                         Solicitud de                   Single Stage - One                                                          Ejecución
los participantes del           IBRD / 85630                                  Posterior                       Limited                                                      30,125.00               0.00                                                                                          2020-03-27                                                                               2020-04-18            2020-05-03
                                                Community Participation                        cotizaciones                   Envelope                                                                    pendiente
programa de formación de
electricistas comunitarios




 B-2-20 / Reproducción de
                                                Citizen Engagement and                         Solicitud de                   Single Stage - One                                                          Ejecución
letreros prepago para las       IBRD / 85630                                  Posterior                       Limited                                                       3,150.00               0.00                                                                                          2020-03-27                                                                               2020-04-15            2020-05-15
                                                Community Participation                        cotizaciones                   Envelope                                                                    pendiente
EDE




NON CONSULTING SERVICES
                                                                                                                                                                                                                                                                                                                                                                       Bid Evaluation
Activity Reference No. /                                                                                                                                                                                                                                                   Draft Bidding
                                Loan / Credit                                                                      Market       Procurement        Prequalification    Estimated       Actual Amount        Process      Draft Pre-qualification    Prequalification                             Specific Procurement   Bidding Documents   Proposal Submission /        Report and
        Description                                      Component               Review Type        Method                                                                                                                                                                  Document /                                                                                                      Signed Contract     Contract Completion
                                      No.                                                                         Approach         Process              (Y/N)         Amount (US$)         (US$)            Status            Documents            Evaluation Report                              Notice / Invitation       as Issued        Opening / Minutes      Recommendation for
                                                                                                                                                                                                                                                                           Justification
                                                                                                                                                                                                                                                                                                                                                                            Award
                                                                                                                                                                                                                          Planned      Actual      Planned    Actual   Planned       Actual      Planned      Actual    Planned    Actual    Planned     Actual     Planned      Actual   Planned      Actual   Planned      Actual


 S-1-1 / S.1.1 Transporte
                                                Rehabilitation of Selected
para el Movimiento de
                                                Distribution Circuits and
Transformadores con PCB -
                                                Upgrading of Metering                          Solicitud de   Open -          Single Stage - One                                                          Ejecución
Tratamiento final Equipo        IBRD / 85630                                  Posterior                                                                                   110,000.00               0.00                                                                2018-12-11                2018-12-16                                 2019-01-27              2019-02-26            2019-04-02            2019-06-01
                                                Systems - Implementation of                    ofertas        International   Envelope                                                                    pendiente
Contaminado - PMAA
                                                Environmental Manag ement
(EDESUR - EDENORTE -
                                                System
EDEESTE)




                                                                                                                                                                                                                              Page 6
 S-2-1 / S.2.1 Edesur:
Gastos de Gestión Social,
tales como: Actividades de
Solidaridad Social en                          Citizen Engagement and                  Solicitud de                     Single Stage - One                       Ejecución
                                IBRD / 85630                               Posterior                  Limited                                  6,040.00   0.00                                     2019-04-06                             2019-05-07   2019-11-03
Comunidades Intervenidas                       Community Participation                 cotizaciones                     Envelope                                 pendiente
(Refrigerios, Transporte,
Alquileres de Carpas, sillas
y mesas, etc.)




 S-2-2 / S.2.2 Edenorte:
Gastos de Gestión Social,
tales como: Actividades de
Solidaridad Social en                          Citizen Engagement and                  Solicitud de                     Single Stage - One                       Ejecución
                                IBRD / 85630                               Posterior                  Limited                                  6,420.00   0.00                                     2019-04-06                             2019-05-07   2019-11-03
Comunidades Intervenidas                       Community Participation                 cotizaciones                     Envelope                                 pendiente
(Refrigerios, Transporte,
Alquileres de Carpas, sillas
y mesas, etc.)




 S-2-3 / S.2.3 Edeeste:
Gastos de Gestión Social,
tales como: Actividades de
Solidaridad Social en                          Citizen Engagement and                  Solicitud de                     Single Stage - One                       Ejecución
                                IBRD / 85630                               Posterior                  Limited                                  3,821.00   0.00                                     2019-05-21                             2019-06-21   2019-12-18
Comunidades Intervenidas                       Community Participation                 cotizaciones                     Envelope                                 pendiente
(Refrigerios, Transporte,
Alquileres de Carpas, sillas
y mesas, etc.)




 S-2-5 / S.2.5. Campaña
Digitales en Redes Sociales
                                               Citizen Engagement and                  Solicitud de                     Single Stage - One                       Ejecución
del Programa de                 IBRD / 85630                               Posterior                  Limited                                 60,000.00   0.00                                     2019-05-30                             2019-06-21   2019-10-19
                                               Community Participation                 cotizaciones                     Envelope                                 pendiente
Rehabilitación de Redes
Eléctricas.




 S-2-6 / Logística para
Ceremonia de Premiación
Concurso Fotográfico Uso
Racional de Energía en                         Citizen Engagement and                  Solicitud de                     Single Stage - One                       Ejecución
                                IBRD / 85630                               Posterior                  Limited                                  7,000.00   0.00                                     2019-02-06                             2019-02-28   2019-03-05
Circuitos en el Ámbito del                     Community Participation                 cotizaciones                     Envelope                                 pendiente
Proyecto - EDE (Refrigerios,
Luces de ambientación,
Truss, Bajantes, etc).




 S-2-7 / Contratación de
servicios para Ruta de
Aprendizaje CIclo de Energá                    Citizen Engagement and                  Solicitud de                     Single Stage - One                       Ejecución
                                IBRD / 85630                               Posterior                  Limited                                  8,000.00   0.00                                     2019-06-07                             2019-07-07   2019-08-06
para Lideres Comutarios de                     Community Participation                 cotizaciones                     Envelope                                 pendiente
Edesur - Edenorte - Edeeste
(Transporte y Refrigerios)




 S-2-4 / S.2.4
Implementación del Plan de                     Citizen Engagement and                  Solicitud de                     Single Stage - One                       Ejecución
                                IBRD / 85630                               Posterior                  Limited                                205,974.00   0.00                                     2019-01-12                             2019-02-12   2019-05-13
Comunicación del PRRE                          Community Participation                 cotizaciones                     Envelope                                 pendiente
(Publicidad Externa)




                                               Commercial Management
 S-3-1 / S.3.1. Contratación
                                               and Project Management,
Servicios de Empresas (15
                                               Monitoring and Evaluation
Brigadas) para Gestión                                                                 Solicitud de                     Single Stage - One
                                IBRD / 85630   of the Distribution Grid    Posterior                  Open - National                        216,333.00   0.00   Cancelado            2019-03-28   2019-04-02   2019-05-14   2019-06-13   2019-07-08   2020-07-07
Técnico - Comercial y                                                                  ofertas                          Envelope
                                               Modernization and Electri
Disciplinario (EDENORTE),
                                               cal Losses Reduction
por   - Comercial
                                               Program




                                               Commercial Management
 S-3-2 / S.3.2. Contratación                   and Project Management,
Servicios de     Empresas (10                  Monitoring and Evaluation
                                                                                       Solicitud de                     Single Stage - One
Brigadas) para Corte y          IBRD / 85630   of the Distribution Grid    Posterior                  Open - National                        420,000.00   0.00   Cancelado            2019-03-28   2019-04-02   2019-05-14   2019-06-13   2019-07-18   2020-07-17
                                                                                       ofertas                          Envelope
Reconexión (EDESUR) -                          Modernization and Electri
Comercial                                      cal Losses Reduction
                                               Program




                                                                                                                                                                             Page 7
                                                 Commercial Management
 S-3-3 / S.3.3. Contratación
                                                 and Project Management,
Servicios de      Empresas (18
                                                 Monitoring and Evaluation
Brigadas) para Gestión                                                                          Solicitud de                           Single Stage - One
                                 IBRD / 85630    of the Distribution Grid      Previa                                Open - National                                              932,200.00                    0.00   Cancelado                                                          2018-12-03             2018-12-08                                          2019-01-19                2019-02-18                2019-03-25                2020-03-24
Técnico - Comercial y                                                                           ofertas                                Envelope
                                                 Modernization and Electri
Disciplinario (EDEESTE) -
                                                 cal Losses Reduction
Comercial
                                                 Program




                                                 Rehabilitation of Selected
 S-1-2 / Disposición Final de                    Distribution Circuits and
Residuos Peligrosos del                          Upgrading of Metering                          Solicitud de                           Single Stage - One                                                              Ejecución
                                 IBRD / 85630                                  Posterior                             Limited                                                       45,000.00                    0.00                                                                                             2020-02-01                                                                                              2020-03-03                2020-05-02
Programa de Rehabilitación                       Systems - Implementation of                    cotizaciones                           Envelope                                                                        pendiente
de Redes Eléctricas                              Environmental Manag ement
                                                 System




CONSULTING FIRMS
Activity Reference No. /                                                                                                                                                                                                                                                                                                                                                          Combined Evaluation
                                 Loan / Credit                                                                            Market        Contract Type        Estimated           Actual                                                            Expression of Interest Short List and Draft Request for Proposals Opening of Technical                   Evaluation of
         Description                                      Component               Review Type         Method                                                                                     Process Status          Terms of Reference                                                                                                                                        Report and Draft           Signed Contract         Contract Completion
                                       No.                                                                               Approach                           Amount (US$)      Amount (US$)                                                                 Notice            Request for Proposals         as Issued          Proposals / Minutes        Technical Proposal
                                                                                                                                                                                                                                                                                                                                                                                  Negotiated Contract
                                                                                                                                                                                                                        Planned       Actual        Planned      Actual       Planned      Actual      Planned    Actual      Planned       Actual      Planned       Actual      Planned       Actual      Planned       Actual      Planned       Actual


                                                                                                Selección basada
 C-2-9-B / c.2.9.b Realizacion                   Citizen Engagement and                                                                                                                          Ejecución
                                 IBRD / 85630                                  Posterior        en calificaciones    Open - National                              40,000.00               0.00                          2018-11-12                 2018-12-03                2018-12-25                                                                                           2019-01-01                2019-01-16                2019-04-16
Documental Proyecto BM                           Community Participation                                                                                                                         pendiente
                                                                                                de consultores




                                                 Commercial Management
                                                 and Project Management,
                                                 Monitoring and Evaluation
 C-3-1 / c.3.1 Auditoria                                                                        Selección basada
                                 IBRD / 85630    of the Distribution Grid      Posterior                             Open - National                             150,000.00               0.00   Cancelado              2018-08-20                 2018-09-10                2018-10-02                                       2018-10-30                2018-11-14                2018-12-01                2018-12-21                2019-12-21
Financiera del Proyecto                                                                         en calidad y costo
                                                 Modernization and Electri
                                                 cal Losses Reduction
                                                 Program




                                                 Commercial Management
                                                 and Project Management,
 C-3-2 / c.3.2 Firma
                                                 Monitoring and Evaluation
verificadora de la Calidad                                                                      Selección basada     Open -
                                 IBRD / 85630    of the Distribution Grid      Previa                                                                          1,920,000.00      1,271,935.00    Firmado                2018-05-29                 2018-06-26                2018-07-24   2018-10-04                          2018-08-28   2018-11-22   2018-09-27   2019-01-14   2018-10-25   2019-04-25   2018-11-29   2019-04-25   2020-05-22
Tecnica de las Obras de                                                                         en calidad y costo International
                                                 Modernization and Electri
Rehabilitacion de Redes
                                                 cal Losses Reduction
                                                 Program




                                                 Commercial Management
                                                 and Project Management,
 C-3-3 / c.3.3.                                  Monitoring and Evaluation
                                                                                                Selección basada     Open -                                                                      Ejecución
Fortalecimiento Institucional    IBRD / 85630    of the Distribution Grid      Previa                                                                            500,000.00               0.00                          2018-09-10                 2018-10-01                2018-10-23                                       2018-11-20                2018-12-20                2019-01-24                2019-02-28                2020-02-28
                                                                                                en calidad y costo International                                                                 pendiente
de las EDE                                       Modernization and Electri
                                                 cal Losses Reduction
                                                 Program




                                                 Commercial Management
                                                 and Project Management,
                                                 Monitoring and Evaluation
 C-3-1-A / Auditoria                                                                            Selección basada
                                 IBRD / 85630    of the Distribution Grid      Previa                                Open - National                             150,000.00               0.00   Cancelado              2018-10-02   2018-10-25    2018-10-16                2018-11-07                                       2018-12-05                2018-12-20                2019-01-06                2019-02-03                2020-02-03
Financiera del Proyecto.                                                                        en calidad y costo
                                                 Modernization and Electri
                                                 cal Losses Reduction
                                                 Program




                                                 Rehabilitation of Selected
 C-1-8 / c.1.8 Sistema de
                                                 Distribution Circuits and
Gestion Integral para la
                                                 Upgrading of Metering                          Selección basada                                                                                 Ejecución
Estandarizacion y Manejo         IBRD / 85630                                  Posterior                             Open - National                             400,000.00               0.00                          2018-12-12                 2019-01-02                2019-01-24                                       2019-02-28                2019-03-30                2019-04-20                2019-05-10                2019-11-06
                                                 Systems - Implementation of                    en calidad y costo                                                                               pendiente
Ambiental del Proyecto -
                                                 Environmental Manag ement
PMAA
                                                 System




 C-2-9-A / c.2.9.a Produccion
de Videos sobre el antes y                                                                      Selección basada
                                                 Citizen Engagement and
después de las obras y           IBRD / 85630                                  Posterior        en calificaciones    Open - National                              21,100.00               0.00   En ejecución           2018-11-04   2018-12-13    2018-11-25   2019-02-07   2019-01-08   2019-03-28                                                                              2019-01-23                2019-02-27                2019-04-28
                                                 Community Participation
testimonios de los                                                                              de consultores
beneficiarios.




                                                                                                                                                                                                                                          Page 8
 C-1-9 / c.1.9 Diagnostico y                    Rehabilitation of Selected
monitoreo del estado actual                     Distribution Circuits and
                                                                                               Selección basada
del agua, suelo y aire en los                   Upgrading of Metering                                                                                                                     Ejecución
                                IBRD / 85630                                  Posterior        en calificaciones   Open - National                         55,000.00               0.00                    2018-11-05                 2018-11-26                2018-12-25                                                        2019-01-24   2019-02-17   2019-05-18
sitios actuales de acopio,                      Systems - Implementation of                                                                                                               pendiente
                                                                                               de consultores
almacen y sitios a remediar                     Environmental Manag ement
- PMAA                                          System




INDIVIDUAL CONSULTANTS
Activity Reference No. /                                                                                                                                                                                                                  Invitation to
                                Loan / Credit                                                                           Market       Contract Type    Estimated           Actual                                                                                  Draft Negotiated
         Description                                     Component               Review Type        Method                                                                                Process Status   Terms of Reference          Identified/Selected                              Signed Contract     Contract Completion
                                      No.                                                                              Approach                      Amount (US$)      Amount (US$)                                                                                   Contract
                                                                                                                                                                                                                                           Consultant
                                                                                                                                                                                                           Planned       Actual       Planned       Actual      Planned      Actual   Planned      Actual   Planned      Actual


                                                Rehabilitation of Selected
                                                Distribution Circuits and
 C-1-1 / c.1.1 Coordinador
                                                Upgrading of Metering                          Selección directa                                                                          Ejecución
Ambiental para la UEP-          IBRD / 85630                                  Previa                               Direct                                 144,000.00               0.00                    2018-07-01                 2018-07-11                                      2018-07-31            2019-07-26
                                                Systems - Implementation of                    de consultores                                                                             pendiente
PMAA
                                                Environmental Manag ement
                                                System




                                                Rehabilitation of Selected
 C-1-5 / c.1.5 Dos                              Distribution Circuits and
Inspectores Medioambientales                    Upgrading of Metering                          Selección directa                                                                          Ejecución
                                IBRD / 85630                                  Previa                               Direct                                 135,000.00               0.00                    2018-06-04                 2018-06-11                                      2018-06-29            2019-06-29
y de Seguridad Industrial                       Systems - Implementation of                    de consultores                                                                             pendiente
(EDESUR) - PMAA                                 Environmental Manag ement
                                                System




                                                Rehabilitation of Selected
 C-1-6 / c.1.6 Dos                              Distribution Circuits and
Inspectores Medioambientales                    Upgrading of Metering                          Selección directa                                                                          Ejecución
                                IBRD / 85630                                  Previa                               Direct                                 135,000.00               0.00                    2018-06-04                 2018-06-11                                      2018-07-01            2019-07-01
y de Seguridad Industrial                       Systems - Implementation of                    de consultores                                                                             pendiente
(EDENORTE) - PMAA                               Environmental Manag ement
                                                System




                                                Rehabilitation of Selected
 C-1-7 / c.1.7 Dos                              Distribution Circuits and
Inspectores Medioambientales                    Upgrading of Metering                          Selección directa                                                                          Ejecución
                                IBRD / 85630                                  Previa                               Direct                                 135,000.00               0.00                    2018-06-04                 2018-06-11                                      2018-07-01            2019-07-01
y de Seguridad Industrial                       Systems - Implementation of                    de consultores                                                                             pendiente
(EDEESTE) - PMAA                                Environmental Manag ement
                                                System




                                                Rehabilitation of Selected
                                                Distribution Circuits and
 C-1-10 / c.1.10   Auditorias
                                                Upgrading of Metering                                                                                                                     Ejecución
de apoyo a la supervision y     IBRD / 85630                                  Posterior        Individual          Limited                                 44,000.00               0.00                    2020-01-10                 2020-01-15                2020-02-04            2020-03-10            2020-04-24
                                                Systems - Implementation of                                                                                                               pendiente
capacitacion - PMAA
                                                Environmental Manag ement
                                                System




                                                Rehabilitation of Selected
                                                Distribution Circuits and
 C-1-11 / c.1.11 Consultor
                                                Upgrading of Metering                                                                                                                     Ejecución
para el Diseno de los           IBRD / 85630                                  Posterior        Individual          Limited                                  7,900.00               0.00                    2018-07-09                 2018-07-16                2018-07-26            2018-08-09            2018-11-07
                                                Systems - Implementation of                                                                                                               pendiente
Puntos Verdes - PMAA
                                                Environmental Manag ement
                                                System




 C-2-1 / c.2.1 Contratacion
                                                Citizen Engagement and                         Selección directa
Coordinador de Gestion          IBRD / 85630                                  Previa                               Direct                                  49,392.00               0.00   En ejecución     2018-06-01                 2018-06-06                                      2018-07-01            2019-07-01
                                                Community Participation                        de consultores
Social




 C-2-2 / c.2.2 Contratacion                     Citizen Engagement and                         Selección directa
                                IBRD / 85630                                  Previa                               Direct                                  33,516.00               0.00   Cancelado        2018-06-04                 2018-06-10                                      2018-08-01            2019-08-01
Analista de Gestion Social                      Community Participation                        de consultores




 C-2-10 / c.2.10 Consultor
para el Diseno de la
                                                Citizen Engagement and
Muestra para el Calculo de      IBRD / 85630                                  Posterior        Individual          Limited                                 25,000.00               0.00   En ejecución     2018-06-28   2018-10-01    2018-07-10   2018-10-04   2018-08-09            2018-08-31            2018-10-15
                                                Community Participation
Usuarios Servicio Electrico y
Capacitacion Personal




                                                                                                                                                                                                                             Page 9
                                                Commercial Management
                                                and Project Management,
 C-3-4 / c.3.4. Especialista                    Monitoring and Evaluation
                                                                                                                                               Ejecución
Adm Legal Contratos Obras,       IBRD / 85630   of the Distribution Grid    Posterior   Individual          Limited   102,000.00        0.00                  2018-05-22                 2018-05-23                2018-06-06   2018-06-15                2019-06-15
                                                                                                                                               pendiente
Bienes y Consultorias                           Modernization and Electri
                                                cal Losses Reduction
                                                Program




                                                Commercial Management
                                                and Project Management,
                                                Monitoring and Evaluation
 C-3-5 / c.3.5 Especialista de                                                          Selección directa                                      Ejecución
                                 IBRD / 85630   of the Distribution Grid    Previa                          Direct    118,000.00        0.00                  2019-03-18                 2019-03-23                             2019-04-10                2020-04-09
Proyectos UEP                                                                           de consultores                                         pendiente
                                                Modernization and Electri
                                                cal Losses Reduction
                                                Program




                                                Commercial Management
                                                and Project Management,
                                                Monitoring and Evaluation
 C-3-7 / c.3.7 Analista de                                                              Selección directa                                      Ejecución
                                 IBRD / 85630   of the Distribution Grid    Previa                          Direct     48,000.00        0.00                  2018-06-04                 2018-06-09                             2018-07-01                2019-07-01
Adquisiciones - UEP                                                                     de consultores                                         pendiente
                                                Modernization and Electri
                                                cal Losses Reduction
                                                Program




                                                Commercial Management
                                                and Project Management,
                                                Monitoring and Evaluation
 C-3-8 / c.3.8 Ingeniero                                                                Selección directa                                      Ejecución
                                 IBRD / 85630   of the Distribution Grid    Previa                          Direct     64,000.00        0.00                  2018-06-06                 2018-06-11                             2018-07-01                2019-07-01
Supervisor UEP                                                                          de consultores                                         pendiente
                                                Modernization and Electri
                                                cal Losses Reduction
                                                Program




                                                Commercial Management
                                                and Project Management,
 C-3-9 / c.3.9 Especialista                     Monitoring and Evaluation
                                                                                        Selección directa                                      Ejecución
Monitoreo y Evaluacion del       IBRD / 85630   of the Distribution Grid    Previa                          Direct     96,000.00        0.00                  2018-06-06                 2018-06-11                             2018-07-16                2019-07-16
                                                                                        de consultores                                         pendiente
Proyecto                                        Modernization and Electri
                                                cal Losses Reduction
                                                Program




 C-2-11 / c.2.11 Consultor
para el Diseno Grafico de
Productos Comunicacionales                      Citizen Engagement and                                                                         Ejecución
                                 IBRD / 85630                               Posterior   Individual          Limited    38,900.00        0.00                  2018-06-01                 2018-06-12                2018-07-12   2018-08-01                2019-08-01
del Programa de                                 Community Participation                                                                        pendiente
Rehabilitacion de Redes
Electricas




 C-2-5-1 / C-2-5-1
Contratación Analistas de                       Citizen Engagement and
                                 IBRD / 85630                               Posterior   Individual          Limited    63,520.00        0.00   En ejecución   2018-10-15   2018-10-27    2018-10-22   2018-10-29   2018-10-27   2018-10-31                2019-10-31
Datos para   Edesur y                           Community Participation
Edeeste.




                                                Commercial Management
                                                and Project Management,
                                                Monitoring and Evaluation
 C-3-1-B / c.3.1 Auditoria                                                              Selección directa
                                 IBRD / 85630   of the Distribution Grid    Previa                          Direct    112,000.00   30,746.08   Firmado        2018-10-30                 2018-11-07   2018-11-07                2019-02-07   2019-03-08   2019-05-17
Financiera del Proyecto                                                                 de consultores
                                                Modernization and Electri
                                                cal Losses Reduction
                                                Program




 C-2-3-A / C-2-3
                                                Citizen Engagement and
Contratación Encargada de        IBRD / 85630                               Posterior   Individual          Limited    55,219.00        0.00   En ejecución   2019-04-10   2019-04-10    2019-04-15                2019-04-30   2019-05-10                2020-05-09
                                                Community Participation
Comunicaciones de la UEP.




 C-2-3 / c.2.3 Encargada de                     Citizen Engagement and                  Selección directa
                                 IBRD / 85630                               Previa                          Direct     55,219.00        0.00   Cancelado      2018-12-10                 2018-12-15                             2019-01-10                2020-01-10
Comunicaciones de la UEP                        Community Participation                 de consultores




 C-2-5 / c.2.5. Contratacion
                                                Citizen Engagement and                  Selección directa                                      Ejecución
Directa Analista de datos        IBRD / 85630                               Posterior                       Direct     36,735.00        0.00                  2018-05-15                 2018-05-25                             2018-07-01                2019-07-01
                                                Community Participation                 de consultores                                         pendiente
Edenorte




                                                                                                                                                                               Page 10
 C-2-7 / c.2.7 Contratacion
de 12 Gestores Sociales de
                                                Citizen Engagement and                    Selección directa                                   Ejecución
Informacion para las EDE (       IBRD / 85630                                 Posterior                       Direct     244,754.00    0.00               2018-05-14             2018-05-20                2018-06-16   2019-06-16
                                                Community Participation                   de consultores                                      pendiente
4 EDESUR - 4 EDENORTE
- 4 EDEESTE)




 C-2-8 / c.2.8 Contratacion
de 95 personas para gestion
social de las EDE (entre
                                                Citizen Engagement and                                                                        Ejecución
gestores y supervisores          IBRD / 85630                                 Posterior   Individual          Limited   2,032,231.00   0.00               2017-06-06             2017-06-11   2017-07-11   2017-08-31   2018-08-31
                                                Community Participation                                                                       pendiente
sociales (36 EDESUR - 37
EDENORTE y 22
EDEESTE)




 C-3-10 / Contratación
Directa de 4    captores                        Commercial Management
actuales, cuyos contratos                       and Project Management,
vencen     para aprovechar: la                  Monitoring and Evaluation
                                                                                                                                              Ejecución
compentencia de este             IBRD / 85630   of the Distribution Grid      Posterior   Individual          Direct      27,890.46    0.00               2019-06-10             2019-06-14   2019-06-19   2019-06-29   2020-06-28
                                                                                                                                              pendiente
personal, la inversión                          Modernization and Electri
realizada en capacitación,                      cal Losses Reduction
la sinergia del equipo de                       Program
trabajo, etc.




                                                Commercial Management
                                                and Project Management,
 C-3-11 / Contratación de 4                     Monitoring and Evaluation
                                                                                                                                              Ejecución
captores comerciales para        IBRD / 85630   of the Distribution Grid      Posterior   Individual          Limited     27,980.46    0.00               2019-06-10             2019-06-15   2019-06-20   2019-06-27   2020-06-26
                                                                                                                                              pendiente
Edenorte.                                       Modernization and Electri
                                                cal Losses Reduction
                                                Program




                                                Commercial Management
                                                and Project Management,
 C-3-12 / Contratación
                                                Monitoring and Evaluation
Directa de 5 supervisores de                                                                                                                  Ejecución
                                 IBRD / 85630   of the Distribution Grid      Posterior   Individual          Direct      47,065.15    0.00               2019-06-10             2019-06-14   2019-06-19   2019-06-29   2020-06-28
captores comerciales para                                                                                                                     pendiente
                                                Modernization and Electri
Edenorte
                                                cal Losses Reduction
                                                Program




 C-2-4-B / c.2.4-B
Contratación Encargada de                       Citizen Engagement and                                                                        Ejecución
                                 IBRD / 85630                                 Posterior   Individual          Limited     18,900.00    0.00               2018-06-25             2019-04-10   2019-05-01   2019-06-10   2020-06-09
Comunicaciones de Edeeste,                      Community Participation                                                                       pendiente
por un año




 C-2-4 / c.2.4 Consultores de
                                                Citizen Engagement and                    Selección directa                                   Ejecución
Comunicacion y Publicidad        IBRD / 85630                                 Posterior                       Direct      91,789.00    0.00               2019-06-07             2019-06-12                2019-07-03   2020-07-02
                                                Community Participation                   de consultores                                      pendiente
de las EDE




                                                Commercial Management
                                                and Project Management,
                                                Monitoring and Evaluation
 C-3-6 / c.3.6. Especialista                                                              Selección directa
                                 IBRD / 85630   of the Distribution Grid      Previa                          Direct     118,000.00    0.00   Cancelado   2018-12-10             2018-12-15                2019-01-02   2020-01-02
en Adquisiciones UEP                                                                      de consultores
                                                Modernization and Electri
                                                cal Losses Reduction
                                                Program




 C-1-9-A / Consultor para la
evaluación ambiental y                          Rehabilitation of Selected
propuesta de remediación de                     Distribution Circuits and
sitios para ser utilizados                      Upgrading of Metering                                                                         Ejecución
                                 IBRD / 85630                                 Posterior   Individual          Open        55,000.00    0.00               2019-05-13             2019-06-18   2019-07-09   2019-08-13   2019-11-11
como lugar de                                   Systems - Implementation of                                                                   pendiente
almacenamiento de residuos                      Environmental Manag ement
eléctricos generados por el                     System
Proyecto




                                                Rehabilitation of Selected
 C-1-4 / c.1.4. Coordinador                     Distribution Circuits and
Ambiental y Seguridad                           Upgrading of Metering
                                 IBRD / 85630                                 Posterior   Individual          Limited     93,600.00    0.00   Cancelado   2018-07-23             2018-07-28   2018-08-07   2018-09-01   2019-09-01
Industrial (EDEESTE) -                          Systems - Implementation of
PMAA                                            Environmental Manag ement
                                                System




                                                                                                                                                                       Page 11
                                             Rehabilitation of Selected
 C-1-4-A / Coordinador                       Distribution Circuits and
Ambiental y Seguridad                        Upgrading of Metering                     Selección directa                                Ejecución
                              IBRD / 85630                                 Posterior                       Direct    93,600.00   0.00               2019-06-25             2019-06-30                2019-07-04   2020-07-03
Industrial (EDEESTE) –                       Systems - Implementation of               de consultores                                   pendiente
PMAA                                         Environmental Manag ement
                                             System




                                             Rehabilitation of Selected
 C-1-2 / c.1.2. Coordinador                  Distribution Circuits and
Ambiental y Seguridad                        Upgrading of Metering
                              IBRD / 85630                                 Posterior   Individual          Limited   93,600.00   0.00   Cancelado   2018-08-09             2018-08-17   2018-08-22   2018-09-01   2019-08-27
Industrial (EDESUR) -                        Systems - Implementation of
PMAA                                         Environmental Manag ement
                                             System




                                             Rehabilitation of Selected
 C-1-3 / c.1.3. Coordinador                  Distribution Circuits and
Ambiental y Seguridad                        Upgrading of Metering
                              IBRD / 85630                                 Posterior   Individual          Limited   93,600.00   0.00   Cancelado   2018-07-23             2018-07-28   2018-08-07   2018-09-01   2019-09-01
Industrial (EDENORTE)-                       Systems - Implementation of
PMAA                                         Environmental Manag ement
                                             System




                                             Rehabilitation of Selected
 C-1-2-A / Coordinador                       Distribution Circuits and
Ambiental y Seguridad                        Upgrading of Metering                     Selección directa                                Ejecución
                              IBRD / 85630                                 Posterior                       Direct    93,600.00   0.00               2019-06-25             2019-08-26                2019-09-04   2020-09-03
Industrial (EDESUR) –                        Systems - Implementation of               de consultores                                   pendiente
PMAA                                         Environmental Manag ement
                                             System




                                             Rehabilitation of Selected
 C-1-3-A / Coordinador                       Distribution Circuits and
Ambiental y Seguridad                        Upgrading of Metering                     Selección directa                                Ejecución
                              IBRD / 85630                                 Posterior                       Direct    93,600.00   0.00               2019-06-25             2019-08-26                2019-09-04   2020-09-03
Industrial (EDENORTE) –                      Systems - Implementation of               de consultores                                   pendiente
PMAA                                         Environmental Manag ement
                                             System




 C-2-2-A / C-2-2-A
                                             Citizen Engagement and                                                                     Ejecución
Contratación Analista de      IBRD / 85630                                 Posterior   Individual          Limited   22,000.00   0.00               2019-09-02             2019-09-07   2019-09-28   2019-11-02   2019-12-02
                                             Community Participation                                                                    pendiente
Gestión Social para la UEP




 C-2-6 / c.2.6 Contratacion
Consultores Asistentes                       Citizen Engagement and                    Selección directa                                Ejecución
                              IBRD / 85630                                 Posterior                       Direct    72,554.00   0.00               2018-05-15             2018-05-23                2018-06-16   2019-06-16
Gestión Social de las EDE                    Community Participation                   de consultores                                   pendiente
(EDENORTE - EDEESTE)




 C-2-6-A / Contratación
                                             Citizen Engagement and                                                                     Ejecución
Asistente Gestión Social de   IBRD / 85630                                 Posterior   Individual          Limited   13,500.00   0.00               2020-01-26             2020-02-02   2020-02-12   2020-02-27   2020-12-31
                                             Community Participation                                                                    pendiente
Edesur




                                                                                                                                                                 Page 12