Department of Water Supply & Sanitation, Punjab Website: www.pbdwss.gov.in 75470 v1 Procurement Report 4 Procurement Plan For Consultancy Contract Status: All Prior Review As on : 16-Nov-2012 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Plan/Actual Receipt of Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Zone: South Zone, Circle: Chandigarh Circle, District: SAS Nagar Consultancy for developing media PRWSS-C- 22-12- 1 P strategy and designing 15.00 CQ 5-11-2006 21-01-2007 N/A N/A N/A 0 12 2006 meterial, (No.-1, Unit Cost- 15) Consultancy for developing media PRWSS-C- 22-12- 2 A strategy and designing CQ 5-11-2006 21-01-2007 12 2006 meterial, (No.-1, Unit Cost- 15) Engineering support for PRWSS-C- renovation of ponds for 21-11- 07-01- 3 P 1.25 CQ 06-02-2007 N/A N/A N/A 0 13 Pilor Batch of 5 ponds, 2006 2007 (No.1,Unit Cost-1.25) Engineering support for PRWSS-C- renovation of ponds for 21-11- 07-01- 4 A CQ 06-02-2007 13 Pilor Batch of 5 ponds, 2006 2007 (No.1,Unit Cost-1.25) Engineering support for small bore sewers for PRWSS-C- 21-11- 07-01- 5 P pilot batch of 5 2.50 CQ 06-02-2007 N/A N/A N/A 0 14 2006 2007 schemes, (No.-1, Unit Cost-2.5) Engineering support for small bore sewers for PRWSS-C- 21-11- 07-01- 6 A pilot batch of 5 CQ 06-02-2007 14 2006 2007 schemes, (No.-1, Unit Cost-2.5) Page 1 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.08 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Post review of the PRWSS-C- procurement 23-04- 7 P 18.00 CQ 7-3-2007 23-05-2007 N/A N/A N/A 0 15 procedure, (No.-Nil, 2007 Unit Cost-18) Post review of the Arun Kumar PRWSS-C- procurement 30-05- 01-06- 2009-07- 8169 / 2.25 / in 238000.0 8 A 3.50 CQ 11-5-2009 24-06-2009 Shrivastav / 0 / 30-11-2009 15 procedure, (No.-Nil, 2009 2009 07 lacs 0 Indian Unit Cost-18) Independent water quality testing PRWSS-C- 21-11- 9 P Consultancy for testing 12.00 CQ 5-10-2006 21-12-2006 N/A N/A N/A 0 16 2006 pestiside,(No.-1, Unit Cost-12) Independent water District Youth quality testing Welfare PRWSS-C- 27-05- 23-06- 1553-56 / 11.40 / 10 A Consultancy for testing 11.40 CQ 22-07-2008 Association, 0.00 16 2008 2008 in lacs pestiside,(No.-1, Unit Mansa / 0 / Cost-12) Indian Independent water quality testing PRWSS-C- 21-11- 11 P Consultancy for testing 10.00 CQ 5-10-2006 21-12-2006 N/A N/A N/A 0 17 2006 other parameters, (No.- 1, Unit Cost-10) Independent water quality testing PRWSS-C- 12 A Consultancy for testing 12.00 CQ 17 other parameters, (No.- 1, Unit Cost-10) Review of international best ractices for dep PRWSS-C- aquifer drilling and 21-12- 13 P 25.00 CQ 4-11-2006 20-01-2007 N/A N/A N/A 0 18 contamination 2006 prevention, (No.-1, Unit Cost-25) Review of international best ractices for dep PRWSS-C- 14 A aquifer drilling and 10.00 CQ 18 contamination prevention, (No.-1, Unit Page 2 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.08 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Cost-25) Capacity Building in PRWSS-C- 03-11- 04-11- 2011-03- 15 P O&M Phase for 500 95.00 QCBS 17-3-2010 3-11-2010 23-12-2010 24-6-2011 N/A N/A 24-09-2012 N/A 0 SPMC-1492 2010 2010 01 Commssioned Villages M/s Wapkos Capacity Building in PRWSS-C- 03-11- 04-11- 2011-03- 6080 / 83.67 / in Limited, 16 A O&M Phase for 500 95.00 QCBS 17-3-2010 11-3-2010 23-12-2010 85 0.00 SPMC-1492 2010 2010 01 lacs Gurgaon / 0 / Commssioned Villages Indian Independent Construction Quality PRWSSP- 11-09- 16-09- 17 P consultants- for Pilot 6.00 IC 27-7-2006 11-9-2006 16-10-2006 N/A N/A N/A 0 C-1 2006 2006 Project (No.-3, Unit Cost-2) Independent Sh. A.K. Jairath, Construction Quality Sh. L.C. PRWSSP- 11-09- 16-09- 703670387040 / 8200000. 18 A consultants- for Pilot 4.50 IC 27-7-2006 16-10-2006 Sharma & Sh. 04-03-2010 C-1 2006 2006 0.96 / in lacs 00 Project (No.-3, Unit ACM Bhandari / Cost-2) 0 / Indian Consultant for capacity building for training to GPWSC Member's PRWSSP- Assistant Accountants 11-11- 19 P 15.00 CQ 25-9-2006 11-12-2006 N/A N/A N/A 0 C-11 etc on financial, 2006 procurement and Accounting metters No.1 Unit cost-15 Consultant for capacity building for training to GPWSC Member's Davinder S. Jaaj PRWSSP- Assistant Accountants 25-07- 16-08- 3999 / 14.00 / in 434390.0 20 A 14.00 CQ 03-09-2007 & Co. / 0 / C-11 etc on financial, 2007 2007 lacs 0 Indian procurement and Accounting metters No.1 Unit cost-15 Page 3 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.08 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Community Develoopment support- PRWSSP- (pilot schemes)- 12-09- 13-09- 21 P 140.00 SSS N/A N/A 20-09-2006 N/A N/A N/A N/A 0 C-2/1 Extension of existing 2006 2006 SO/NGO's contract (No.-5, Unit Cost- 28) Community Water Resource Develoopment support- Development PRWSSP- (pilot schemes)- 30-08- spl-1 / 7.20 / in 22 A 7.20 SSS N/A N/A Service, 19-09-2007 78000.00 C-2/1 Extension of existing 2006 lacs Panchkula / 0 / SO/NGO's contract Indian (No.-5, Unit Cost- 28) Community Develoopment support- PRWSSP- (pilot schemes)- 12-09- 13-09- 23 P 140.00 SSS N/A N/A 20-09-2006 N/A N/A N/A N/A 0 C-2/2 Extension of existing 2006 2006 SO/NGO's contract (No.-5, Unit Cost- 28) Community District Youth Develoopment support- Welfare PRWSSP- (pilot schemes)- 30-08- spl-2 / 10.56 / in 157000.0 24 A 10.56 SSS N/A N/A Association, 19-09-2007 C-2/2 Extension of existing 2006 lacs 0 Mansa / 0 / SO/NGO's contract Indian (No.-5, Unit Cost- 28) Community Develoopment support- PRWSSP- (pilot schemes)- 12-09- 13-09- 25 P 140.00 SSS N/A N/A 20-09-2006 N/A N/A N/A N/A 0 C-2/3 Extension of existing 2006 2006 SO/NGO's contract (No.-5, Unit Cost- 28) Community Develoopment support- Youth PRWSSP- (pilot schemes)- 30-08- spl-3 / 2.40 / in Foundation, 26 A 2.40 SSS N/A N/A 19-09-2007 34000.00 C-2/3 Extension of existing 2006 lacs Kharar / 0 / SO/NGO's contract Indian (No.-5, Unit Cost- 28) Community PRWSSP- Develoopment support- 12-09- 13-09- 27 P 140.00 SSS N/A N/A 20-09-2006 N/A N/A N/A N/A 0 C-2/4 (pilot schemes)- 2006 2006 Extension of existing Page 4 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.08 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 SO/NGO's contract (No.-5, Unit Cost- 28) Community Develoopment support- SIDT, PRWSSP- (pilot schemes)- 30-08- spl-4 / 20.16 / in 28 A 20.16 SSS N/A N/A Panchkula / 0 / 19-09-2007 0.00 C-2/4 Extension of existing 2006 lacs Indian SO/NGO's contract (No.-5, Unit Cost- 28) Community Develoopment support- PRWSSP- (pilot schemes)- 12-09- 13-09- 29 P 140.00 SSS N/A N/A 20-09-2006 N/A N/A N/A N/A 0 C-2/5 Extension of existing 2006 2006 SO/NGO's contract (No.-5, Unit Cost- 28) Community Develoopment support- Sarv Sehyog PRWSSP- (pilot schemes)- 30-08- spl-5 / 1.92 / in Society, 30 A 1.92 SSS N/A N/A 19-09-2007 0.00 C-2/5 Extension of existing 2006 lacs Chandigarh / 0 / SO/NGO's contract Indian (No.-5, Unit Cost- 28) Community Develoopment support- PRWSSP- (pilot schemes)- 12-09- 13-09- 31 P 140.00 SSS N/A N/A 20-09-2006 N/A N/A N/A N/A 0 C-2/6 Extension of existing 2006 2006 SO/NGO's contract (No.-5, Unit Cost- 28) Community Water Resource Develoopment support- Development PRWSSP- (pilot schemes)- 20-11- spl-6 / 7.20 / in 32 A 7.20 SSS N/A N/A Service, 19-09-2008 90000.00 C-2/6 Extension of existing 2007 lacs Panchkula / 0 / SO/NGO's contract Indian (No.-5, Unit Cost- 28) Community Develoopment support- PRWSSP- (pilot schemes)- 12-09- 13-09- 33 P 140.00 SSS N/A N/A 20-09-2006 N/A N/A N/A N/A 0 C-2/7 Extension of existing 2006 2006 SO/NGO's contract (No.-5, Unit Cost- 28) Page 5 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.08 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Community District Youth Develoopment support- Welfare PRWSSP- (pilot schemes)- 20-11- spl-7 / 10.56 / in 34 A 10.56 SSS N/A N/A Association, 19-09-2008 0.00 C-2/7 Extension of existing 2007 lacs Mansa / 0 / SO/NGO's contract Indian (No.-5, Unit Cost- 28) Community Develoopment support- PRWSSP- (pilot schemes)- 12-09- 13-09- 35 P 140.00 SSS N/A N/A 20-09-2006 N/A N/A N/A N/A 0 C-2/8 Extension of existing 2006 2006 SO/NGO's contract (No.-5, Unit Cost- 28) Community Develoopment support- Youth PRWSSP- (pilot schemes)- 20-11- spl-8 / 2.40 / in Foundation, 36 A 2.40 SSS N/A N/A 19-09-2008 0.00 C-2/8 Extension of existing 2007 lacs Kharar / 0 / SO/NGO's contract Indian (No.-5, Unit Cost- 28) Community development support- (batch-I Schemes), Unit PRWSSP- 15-09- 18-09- 37 P Cost- Misc small 538.00 FBS 1-9-2006 15-9-2006 18-10-2006 N/A N/A N/A 0 C-3/1 2006 2006 contracts value of each contract not to exceed Rs. 20 lacs. Community United Welfare development support- and (batch-I Schemes), Unit PRWSSP- 18-09- 20-09- 2116 / 12.00 / in Development 38 A Cost- Misc small 12.00 FBS 1-9-2006 05-10-2006 09-11-2007 60000.00 C-3/1 2006 2006 lacs Society, contracts value of each Chandigarh / 0 / contract not to exceed Indian Rs. 20 lacs. Community development support- (batch-I Schemes), Unit PRWSSP- 15-09- 18-09- 39 P Cost- Misc small 538.00 FBS 1-9-2006 15-9-2006 18-10-2006 N/A N/A N/A 0 C-3/10 2006 2006 contracts value of each contract not to exceed Rs. 20 lacs. Page 6 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.08 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Community development support- (batch-I Schemes), Unit Lok Kalyan PRWSSP- 18-09- 20-09- 2125 / 12.00 / in 120000.0 40 A Cost- Misc small 12.00 FBS 1-9-2006 05-10-2006 Samiti, Amritsar 09-11-2007 C-3/10 2006 2006 lacs 0 contracts value of each / 0 / Indian contract not to exceed Rs. 20 lacs. Community development support- (batch-I Schemes), Unit PRWSSP- 15-09- 18-09- 41 P Cost- Misc small 538.00 FBS 1-9-2006 15-9-2006 18-10-2006 N/A N/A N/A 0 C-3/11 2006 2006 contracts value of each contract not to exceed Rs. 20 lacs. Community development support- Pendu Vikas (batch-I Schemes), Unit and Samaj PRWSSP- 18-09- 20-09- 2126 / 12.00 / in 42 A Cost- Misc small 12.00 FBS 1-9-2006 05-10-2006 Bhalai Sanstha, 09-11-2007 60000.00 C-3/11 2006 2006 lacs contracts value of each Anandpur Sahib contract not to exceed / 0 / Indian Rs. 20 lacs. Community development support- (batch-I Schemes), Unit PRWSSP- 15-09- 18-09- 43 P Cost- Misc small 538.00 FBS 1-9-2006 15-9-2006 18-10-2006 N/A N/A N/A 0 C-3/12 2006 2006 contracts value of each contract not to exceed Rs. 20 lacs. Community development support- Sahota (batch-I Schemes), Unit PRWSSP- 18-09- 20-09- 2127 / 12.00 / in Education 44 A Cost- Misc small 12.00 FBS 1-9-2006 05-10-2006 09-11-2007 60000.00 C-3/12 2006 2006 lacs Society, Mohali / contracts value of each 0 / Indian contract not to exceed Rs. 20 lacs. Community development support- PRWSSP- (batch-I Schemes), Unit 15-09- 18-09- 45 P 538.00 FBS 1-9-2006 15-9-2006 18-10-2006 N/A N/A N/A 0 C-3/13 Cost- Misc small 2006 2006 contracts value of each contract not to exceed Page 7 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.08 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Rs. 20 lacs. Community development support- Malwa (batch-I Schemes), Unit PRWSSP- 18-09- 20-09- 2128 / 12.00 / in Foundation, 46 A Cost- Misc small 12.00 FBS 1-9-2006 05-10-2006 09-11-2007 60000.00 C-3/13 2006 2006 lacs Punjab / 0 / contracts value of each Indian contract not to exceed Rs. 20 lacs. Community development support- (batch-I Schemes), Unit PRWSSP- 15-09- 18-09- 47 P Cost- Misc small 538.00 FBS 1-9-2006 15-9-2006 18-10-2006 N/A N/A N/A 0 C-3/14 2006 2006 contracts value of each contract not to exceed Rs. 20 lacs. Community development support- Social Work and (batch-I Schemes), Unit Rural PRWSSP- 18-09- 20-09- 2129 / 12.00 / in 48 A Cost- Misc small 12.00 FBS 1-9-2006 05-10-2006 Development 09-11-2007 60000.00 C-3/14 2006 2006 lacs contracts value of each Centre, Ropar / contract not to exceed 0 / Indian Rs. 20 lacs. Community development support- (batch-I Schemes), Unit PRWSSP- 15-09- 18-09- 49 P Cost- Misc small 538.00 FBS 1-9-2006 15-9-2006 18-10-2006 N/A N/A N/A 0 C-3/15 2006 2006 contracts value of each contract not to exceed Rs. 20 lacs. Community Saubhagya All development support- India (batch-I Schemes), Unit PRWSSP- 18-09- 20-09- 2130 / 12.00 / in Foundation for 50 A Cost- Misc small 12.00 FBS 1-9-2006 05-10-2006 09-11-2007 60000.00 C-3/15 2006 2006 lacs Social Work, contracts value of each Gaziabad / 0 / contract not to exceed Indian Rs. 20 lacs. Page 8 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.08 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Community development support- (batch-I Schemes), Unit PRWSSP- 15-09- 18-09- 51 P Cost- Misc small 538.00 FBS 1-9-2006 15-9-2006 18-10-2006 N/A N/A N/A 0 C-3/16 2006 2006 contracts value of each contract not to exceed Rs. 20 lacs. Community development support- Water Resource (batch-I Schemes), Unit Development PRWSSP- 18-09- 20-09- 2131 / 12.00 / in 52 A Cost- Misc small 12.00 FBS 1-9-2006 05-10-2006 Service 09-11-2007 60000.00 C-3/16 2006 2006 lacs contracts value of each (Panchkula) / 0 / contract not to exceed Indian Rs. 20 lacs. Community development support- (batch-I Schemes), Unit PRWSSP- 15-09- 18-09- 53 P Cost- Misc small 538.00 FBS 1-9-2006 15-9-2006 18-10-2006 N/A N/A N/A 0 C-3/17 2006 2006 contracts value of each contract not to exceed Rs. 20 lacs. Community development support- Progressive (batch-I Schemes), Unit PRWSSP- 18-09- 20-09- 2132 / 12.00 / in Youth Forum, 54 A Cost- Misc small 12.00 FBS 1-9-2006 05-10-2006 09-11-2007 60000.00 C-3/17 2006 2006 lacs Patiala / 0 / contracts value of each Indian contract not to exceed Rs. 20 lacs. Community development support- (batch-I Schemes), Unit PRWSSP- 15-09- 18-09- 55 P Cost- Misc small 538.00 FBS 1-9-2006 15-9-2006 18-10-2006 N/A N/A N/A 0 C-3/2 2006 2006 contracts value of each contract not to exceed Rs. 20 lacs. Community The Sai development support- Dharamsingh PRWSSP- (batch-I Schemes), Unit 18-09- 20-09- 2117 / 12.00 / in 56 A 12.00 FBS 1-9-2006 05-10-2006 Grover 09-11-2007 60000.00 C-3/2 Cost- Misc small 2006 2006 lacs Foundation / 0 / contracts value of each Indian contract not to exceed Page 9 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.08 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Rs. 20 lacs. Community development support- (batch-I Schemes), Unit PRWSSP- 15-09- 18-09- 57 P Cost- Misc small 538.00 FBS 1-9-2006 15-9-2006 18-10-2006 N/A N/A N/A 0 C-3/3 2006 2006 contracts value of each contract not to exceed Rs. 20 lacs. Community development support- (batch-I Schemes), Unit Kheti Virasat, PRWSSP- 18-09- 20-09- 2118 / 12.00 / in 58 A Cost- Misc small 12.00 FBS 1-9-2006 05-10-2006 Patiala / 0 / 09-11-2007 60000.00 C-3/3 2006 2006 lacs contracts value of each Indian contract not to exceed Rs. 20 lacs. Community development support- (batch-I Schemes), Unit PRWSSP- 15-09- 18-09- 59 P Cost- Misc small 538.00 FBS 1-9-2006 15-9-2006 18-10-2006 N/A N/A N/A 0 C-3/4 2006 2006 contracts value of each contract not to exceed Rs. 20 lacs. Community development support- Youth (batch-I Schemes), Unit PRWSSP- 18-09- 20-09- 2119 / 12.00 / in Foundation, 60 A Cost- Misc small 12.00 FBS 1-9-2006 09-11-2007 60000.00 C-3/4 2006 2006 lacs Ropar / 0 / contracts value of each Indian contract not to exceed Rs. 20 lacs. Community development support- (batch-I Schemes), Unit PRWSSP- 15-09- 18-09- 61 P Cost- Misc small 538.00 FBS 1-9-2006 15-9-2006 18-10-2006 N/A N/A N/A 0 C-3/5 2006 2006 contracts value of each contract not to exceed Rs. 20 lacs. Page 10 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.08 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Community development support- Lala Jagat (batch-I Schemes), Unit Naryana PRWSSP- 18-09- 20-09- 2120 / 12.00 / in 62 A Cost- Misc small 12.00 FBS 1-9-2006 05-10-2006 Memorial 09-11-2007 60000.00 C-3/5 2006 2006 lacs contracts value of each Charitable Trust contract not to exceed / 0 / Indian Rs. 20 lacs. Community development support- (batch-I Schemes), Unit PRWSSP- 15-09- 18-09- 63 P Cost- Misc small 538.00 FBS 1-9-2006 15-9-2006 18-10-2006 N/A N/A N/A 0 C-3/6 2006 2006 contracts value of each contract not to exceed Rs. 20 lacs. Community development support- District Youth (batch-I Schemes), Unit Welfare PRWSSP- 18-09- 20-09- 2121 / 12.00 / in 64 A Cost- Misc small 12.00 FBS 1-9-2006 05-10-2006 Association, 09-11-2007 60000.00 C-3/6 2006 2006 lacs contracts value of each Mansa / 0 / contract not to exceed Indian Rs. 20 lacs. Community development support- (batch-I Schemes), Unit PRWSSP- 15-09- 18-09- 65 P Cost- Misc small 538.00 FBS 1-9-2006 15-9-2006 18-10-2006 N/A N/A N/A 0 C-3/7 2006 2006 contracts value of each contract not to exceed Rs. 20 lacs. Community Indian Rural development support- Development (batch-I Schemes), Unit PRWSSP- 18-09- 20-09- 2122 / 12.00 / in and Social 105000.0 66 A Cost- Misc small 12.00 FBS 1-9-2006 05-10-2006 09-11-2007 C-3/7 2006 2006 lacs Welfare Society, 0 contracts value of each Patiala / 0 / contract not to exceed Indian Rs. 20 lacs. Community development support- PRWSSP- (batch-I Schemes), Unit 15-09- 18-09- 67 P 538.00 FBS 1-9-2006 15-9-2006 18-10-2006 N/A N/A N/A 0 C-3/8 Cost- Misc small 2006 2006 contracts value of each contract not to exceed Page 11 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.08 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Rs. 20 lacs. Community development support- Education (batch-I Schemes), Unit PRWSSP- 18-09- 20-09- 2123 / 12.00 / in Welfare Society, 68 A Cost- Misc small 12.00 FBS 1-9-2006 05-10-2006 09-11-2007 60000.00 C-3/8 2006 2006 lacs Ludhiana / 0 / contracts value of each Indian contract not to exceed Rs. 20 lacs. Community development support- (batch-I Schemes), Unit PRWSSP- 15-09- 18-09- 69 P Cost- Misc small 538.00 FBS 1-9-2006 15-9-2006 18-10-2006 N/A N/A N/A 0 C-3/9 2006 2006 contracts value of each contract not to exceed Rs. 20 lacs. Community development support- Sarv Sehyog (batch-I Schemes), Unit PRWSSP- 18-09- 20-09- 2124 / 12.00 / in Society, 70 A Cost- Misc small 12.00 FBS 1-9-2006 05-10-2006 09-11-2007 60000.00 C-3/9 2006 2006 lacs Chandigarh / 0 / contracts value of each Indian contract not to exceed Rs. 20 lacs. Preperation of Water resource map- PRWSSP- 10-10- 20-10- 71 P extension of existing 47.00 SSS N/A N/A 27-10-2006 N/A N/A N/A N/A 0 C-4/1 2006 2006 consultancy, (No. 1, Unit Cost- 47) Preperation of Water resource map- Punjab Remote PRWSSP- 1125 / 17.34 / in 1718100. 72 A extension of existing 17.34 SSS N/A 19-05-2006 N/A Sensing / 0 / 15-12-2010 C-4/1 lacs 00 consultancy, (No. 1, Indian Unit Cost- 47) Preperation of Water resource map- PRWSSP- 14-11- 14-11- 17-11- 2007-02- 73 P extension of existing 100.00 QCBS 21-9-2006 01-01-2007 20-4-2007 N/A N/A N/A 0 C-4/2 2006 2006 2006 22 consultancy, (No. 1, Unit Cost- 47) Page 12 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.09 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Preperation of Water resource map- Punjab Remote PRWSSP- 2007-03- spl-10 / 4.31 / in 74 A extension of existing 4.31 QCBS Sensing / 0 / 0.00 C-4/2 06 lacs consultancy, (No. 1, Indian Unit Cost- 47) Development of program MIS (including PRWSSP- 14-11- 14-11- 17-11- 2007-02- 75 P pilot testing training and 100.00 QCBS 21-9-2006 01-01-2007 20-4-2007 N/A N/A N/A 0 C-5 2006 2006 2006 22 state vide roll out), No.- 1, Unit Cost-100 Development of program MIS (including PRWSSP- 76 A pilot testing training and ICB C-5 state vide roll out), No.- 1, Unit Cost-100 PRWSSP- Internal auditor-I, (No. 11-10- 77 P 25.00 CQ 25-8-2006 10-11-2006 N/A N/A N/A 0 C-6 1, Unit Cost-25) 2006 PRWSSP- Internal auditor-I, (No. 15-01- 78 A CQ 8-12-2008 18-02-2009 C-6 1, Unit Cost-25) 2009 Concurrent financial PRWSSP- 22-10- 79 P review-I, (No.-1, Unit 7.50 CQ 5-9-2006 21-11-2006 N/A N/A N/A 0 C-7 2006 Cost 14.25) Aggarwal A. Concurrent financial PRWSSP- 19-02- 21-12- 29-02- 5792 / 14.51 / in Kumar & 130630.0 80 A review-I, (No.-1, Unit 14.51 CQ 28-03-2008 23-06-2009 C-7 2008 2007 2008 lacs Associates / 0 / 0 Cost 14.25) Indian Concurrent financial PRWSSP- 22-10- 81 P review-2 (No.-1, Unit 7.50 CQ 5-9-2006 21-11-2006 N/A N/A N/A 0 C-8 2006 Cost-14.25) Page 13 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.09 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Aggarwal A. Concurrent financial PRWSSP- 5255 / 26.59 / in Kumar & 324349.0 82 A review-2 (No.-1, Unit CQ 23-06-2010 C-8 lacs Associates / 0 / 0 Cost-14.25) Indian Independent 01-12- 01-12- 2010-05- 83 SPMC-1 P constructions quality 174.00 QCBS 1-9-2008 1-12-2008 01-02-2009 N/A N/A 06-12-2012 N/A 0 2008 2008 28 survcilance ageny Independent Voyants 01-12- 19-11- 01-12- 2010-05- 12144 / 75.75 / in 84 SPMC-1 A constructions quality 174.00 QCBS 1-9-2008 01-02-2009 Solution Pvt. 06-12-2012 46 0.00 2008 2009 2008 28 lacs survcilance ageny Ltd. / 0 / Indian Hiring the service of 15-10- 15-10- 18-10- 85 spmc-10 P theatre groups for 20.00 CQ 30-10-2008 N/A N/A 31-01-2009 N/A 0 2008 2008 2008 street plays Hiring the service of 86 spmc-10 A theatre groups for 0.00 CQ street plays Preparation of 2 Video Documentaries-(8-10 min) (i) One on success 15-10- 15-10- 18-10- 87 spmc-11 P stories with people 4.00 LCS N/A 30-10-2008 N/A N/A 30-11-2008 N/A 0 2008 2008 2008 participation (ii) One on ill effects of contaminatd water Preparation of 2 Video Documentaries-(8-10 min) (i) One on success Genesis Media 16-04- 18-04- 6137 / 2.76 / in 276000.0 88 spmc-11 A stories with people 4.00 LCS N/A 22-05-2009 Pvt. Ltd. / 0 / 30-11-2009 2009 2009 lacs 0 participation (ii) One on Indian ill effects of contaminatd water Preparation & Telecast 15-10- 20-10- 89 spmc-12 P of Audio-visual on 18.00 SSS N/A N/A 31-10-2008 N/A N/A N/A 31-12-2008 N/A 0 2008 2008 Doordarshan (TV) Page 14 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.09 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Preparation & Telecast Doordarshan 01-01- 03-01- 939 / 15.05 / in 1059000. 90 spmc-12 A of Audio-visual on 15.05 SSS N/A 03-02-2009 N/A Jalandhar / 0 / 23-06-2009 2009 2009 lacs 00 Doordarshan (TV) Indian Engaging agency for 15-10- 20-10- 91 spmc-13 P road show with media 10.00 SSS N/A N/A 31-10-2008 N/A N/A N/A 31-01-2009 N/A 0 2008 2008 publicity Engaging agency for Prasar Bharti 01-01- 03-01- 5068 / 8.35 / in 778000.0 92 spmc-13 A road show with media 8.35 SSS N/A 02-02-2009 N/A DD Jalandhar / 12-05-2009 2009 2009 lacs 0 publicity 0 / Indian Advertisement in newspapers (Twice in a week for 2 month 15-10- 93 spmc-14 P 32.00 SSS N/A N/A 31-10-2008 N/A N/A N/A 31-01-2009 N/A 0 Punjab Kesri, Jagbani, 2008 Ajit, Danik Bhaskar & The Tribune Advertisement in newspapers (Twice in a week for 2 month 15-10- 94 spmc-14 A SSS N/A 31-10-2008 N/A Punjab Kesri, Jagbani, 2008 Ajit, Danik Bhaskar & The Tribune Preparation of Water Resoruce & Quality 95 spmc-15 P Map- Extension of 0.00 SSS N/A N/A N/A N/A N/A N/A 0 contract of 16 districts of state Preparation of Water Resoruce & Quality Punjab Remote 17-02- 5267 / 106.00 / in 1018116. 96 spmc-15 A Map- Extension of 106.00 SSS N/A N/A 12-5-2010 Sensing / 0 / 27-11-2011 63 2010 lacs 00 contract of 16 districts Indian of state Extension of community 31-05- 97 spmc-16/11 P development support 108.00 FBS 31-5-2008 N/A N/A 31-12-2009 N/A 0 2008 (Batch -1 Schemes) Page 15 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.09 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 District Youth Extension of community Welfare 30-05- 3668 / 0.00 / in 98 spmc-16/11 A development support 11.40 FBS Association, 0.00 2008 lacs (Batch -1 Schemes) Mansa / 0 / Indian Extension of community 31-05- 99 spmc-16/12 P development support 108.00 FBS 31-5-2008 N/A N/A 31-12-2009 N/A 0 2008 (Batch -1 Schemes) United Welfare and Extension of community 30-05- 3666 / 0.00 / in Development 100 spmc-16/12 A development support 11.40 FBS 0.00 2008 lacs Society, (Batch -1 Schemes) Chandigarh / 0 / Indian Extension of community 31-05- 101 spmc-16/13 P development support 108.00 FBS 31-5-2008 N/A N/A 31-12-2009 N/A 0 2008 (Batch -1 Schemes) The Sai Dharam Extension of community 30-05- 3672 / 0.00 / in Singh Grover 102 spmc-16/13 A development support 11.40 FBS 0.00 2008 lacs Foundation / 0 / (Batch -1 Schemes) Indian Extension of community 31-05- 103 spmc-16/14 P development support 108.00 FBS 31-5-2008 N/A N/A 31-12-2009 N/A 0 2008 (Batch -1 Schemes) Youth Extension of community 30-05- 3678 / 0.00 / in Foundation, 104 spmc-16/14 A development support 11.40 FBS 0.00 2008 lacs Ropar / 0 / (Batch -1 Schemes) Indian Extension of community 31-05- 105 spmc-16/15 P development support 108.00 FBS 31-5-2008 N/A N/A 31-12-2009 N/A 0 2008 (Batch -1 Schemes) Page 16 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.09 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Education Extension of community 30-05- 3664 / 0.00 / in Welfare Society, 106 spmc-16/15 A development support 11.40 FBS 0.00 2008 lacs Ludhiana / 0 / (Batch -1 Schemes) Indian Extension of community 31-05- 107 spmc-16/16 P development support 108.00 FBS 31-5-2008 N/A N/A 31-12-2009 N/A 0 2008 (Batch -1 Schemes) Water Resource Extension of community Development 30-05- 3676 / 0.00 / in 108 spmc-16/16 A development support 11.40 FBS Service 0.00 2008 lacs (Batch -1 Schemes) (Panchkula) / 0 / Indian Extension of community 31-05- 109 spmc-16/17 P development support 108.00 FBS 31-5-2008 N/A N/A 31-12-2009 N/A 0 2008 (Batch -1 Schemes) Progressive Extension of community 30-05- 3670 / 0.00 / in Youth Forum, 110 spmc-16/17 A development support 11.40 FBS 0.00 2008 lacs Patiala / 0 / (Batch -1 Schemes) Indian Extension of community 31-05- 111 spmc-16/18 P development support 108.00 FBS 31-5-2008 N/A N/A 31-12-2009 N/A 0 2008 (Batch -1 Schemes) Lala Jagat Narayana Extension of community 30-05- 3674 / 0.00 / in Memorial 112 spmc-16/18 A development support 11.40 FBS 0.00 2008 lacs Charitable (Batch -1 Schemes) Trust, Mansa / 0 / Indian Extension of community 31-05- 113 spmc-16/19 P development support 108.00 FBS 31-5-2008 N/A N/A 31-12-2009 N/A 0 2008 (Batch -1 Schemes) Page 17 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.09 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Social Work and Extension of community Rural 30-05- 3662 / 0.00 / in 114 spmc-16/19 A development support 11.40 FBS Development 0.00 2008 lacs (Batch -1 Schemes) Centre, Ropar / 0 / Indian Extension of Community 15-07- 115 spmc-17 P 18.00 FBS 15-7-2008 N/A N/A 31-12-2008 N/A 0 development support 2008 (Batch-1 Schemes) Saubhagya All Extension of India Community 30-05- 2008-07- spl-11 / 14.90 / in Foundation for 852000.0 116 spmc-17 A 14.90 FBS development support 2008 14 lacs Social Work, 0 (Batch-1 Schemes) Gaziabad / 0 / Indian Community development support (Batch -1 Schemes) - 15-05- 10-10- 117 spmc-18/1 P 120.00 FBS 3-7-2008 15-5-2008 30-11-2008 N/A N/A 31-12-2009 N/A 0 10 contracts each to be 2008 2008 signed with respective DPMCs Community development support The Nabha (Batch -1 Schemes) - 31-05- 17-11- Foundation 118 spmc-18/1 A 9.14 FBS 4-7-2008 23-12-2008 101 / 9.14 / in lacs 26-02-2010 0.00 10 contracts each to be 2008 2008 Patiala / 0 / signed with respective Indian DPMCs Community development support (Batch -1 Schemes) - 15-05- 10-10- 119 spmc-18/2 P 120.00 FBS 3-7-2008 15-5-2008 30-11-2008 N/A N/A 31-12-2009 N/A 0 10 contracts each to be 2008 2008 signed with respective DPMCs Community development support Confideration of (Batch -1 Schemes) - 31-05- 17-11- NGOs of Rural 109000.0 120 spmc-18/2 A 9.98 FBS 4-7-2008 23-12-2008 932 / 9.98 / in lacs 09-02-2010 10 contracts each to be 2008 2008 India, Punjab / 0 0 signed with respective / Indian DPMCs Page 18 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.09 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Community development support (Batch -1 Schemes) - 15-05- 10-10- 121 spmc-18/3 P 120.00 FBS 3-7-2008 15-5-2008 30-11-2008 N/A N/A 31-12-2009 N/A 0 10 contracts each to be 2008 2008 signed with respective DPMCs Community development support Adarsh Seva (Batch -1 Schemes) - 31-05- 17-11- G-756203 / 8.28 / 122 spmc-18/3 A 8.28 FBS 4-7-2008 23-12-2008 Samiti, Ropar / 26-02-2010 0.00 10 contracts each to be 2008 2008 in lacs 0 / Indian signed with respective DPMCs Community development support (Batch -1 Schemes) - 15-05- 10-10- 123 spmc-18/4 P 120.00 FBS 3-7-2008 15-5-2008 30-11-2008 N/A N/A 31-12-2009 N/A 0 10 contracts each to be 2008 2008 signed with respective DPMCs Community development support ISPER, Tarn (Batch -1 Schemes) - 31-05- 17-11- 65123 / 8.43 / in 214416.0 124 spmc-18/4 A 8.43 FBS 4-7-2008 23-12-2008 Taran / 0 / 26-02-2010 10 contracts each to be 2008 2008 lacs 0 Indian signed with respective DPMCs Community development support (Batch -1 Schemes) - 15-05- 10-10- 125 spmc-18/5 P 120.00 FBS 3-7-2008 15-5-2008 30-11-2008 N/A N/A 31-12-2009 N/A 0 10 contracts each to be 2008 2008 signed with respective DPMCs Community development support Lime Centre, (Batch -1 Schemes) - 31-05- 17-11- NGO/10/09 / 9.48 448991.0 126 spmc-18/5 A 8.43 FBS 4-7-2008 23-12-2008 Gurdaspur / 0 / 16-03-2010 10 contracts each to be 2008 2008 / in lacs 0 Indian signed with respective DPMCs Community development support 15-05- 10-10- 127 spmc-18/6 P 120.00 FBS 3-7-2008 15-5-2008 30-11-2008 N/A N/A 31-12-2009 N/A 0 (Batch -1 Schemes) - 2008 2008 10 contracts each to be Page 19 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.09 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 signed with respective DPMCs Community development support Rural (Batch -1 Schemes) - 31-05- 17-11- 930 / 10.67 / in Association for 128 spmc-18/6 A 10.67 FBS 4-7-2008 23-12-2008 27488.00 10 contracts each to be 2008 2008 lacs Human Interest signed with respective / 0 / Indian DPMCs Hiring Consultancy to provide a technical 15-09- 01-10- 2009-01- 129 SPMC19 P support to DWSS 2000.00 QCBS 1-9-2007 15-9-2008 01-11-2008 N/A N/A N/A 0 2008 2008 30 Punjab as per Aid Memoire Hiring Consultancy to Consulting provide a technical Engineering 12-11- 12-11- 18-11- 2009-02- 8982 / 1994.52 / in 42185000 130 SPMC19 A support to DWSS 2000.00 QCBS 10-9-2007 08-01-2009 22-6-2009 Services (India) 23-10-2012 52 2008 2008 2008 04 lacs .00 Punjab as per Aid Pvt. Ltd. / 0 / Memoire Indian 01-12- 01-12- 131 SPMC-2 P Procurement Audit 20.00 CQ 1-10-2008 1-12-2008 01-03-2009 N/A N/A N/A 0 2008 2008 01-12- 01-12- 132 SPMC-2 A Procurement Audit CQ 1-10-2008 01-03-2009 2008 2008 01-12- 01-12- 133 SPMC-3 P InternalAudit 16.00 CQ 1-10-2008 1-12-2008 01-03-2009 N/A N/A N/A 0 2008 2008 Gianender & 15-01- 270553.0 134 SPMC-3 A InternalAudit 5.15 CQ 8-12-2008 18-02-2009 281 / 2.58 / in lacs Associates / 0 / 2009 0 Indian Page 20 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.09 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Development of a 01-09- 01-10- 2008-12- 135 SPMC-4 P 100.00 QCBS 1-8-2008 1-9-2008 01-11-2008 30-12-2008 N/A N/A 01-04-2010 N/A 0 programme MIS 2008 2008 15 Deloittee Touch Development of a 14-07- 16-07- 2009-11- SPMC-4 / 120.00 / 6370000. 136 SPMC-4 A 132.36 QCBS 24-4-2009 14-7-2009 25-09-2009 31-5-2010 Tohmastu Pvt. 01-01-2014 33 programme MIS 2009 2009 06 in lacs 00 Ltd. / 0 / Indian Annual Training & 15-03- 01-04- 137 SPMC-5 P 5.00 SSS N/A N/A 01-05-2009 N/A 15-6-2009 N/A N/A 01-12-2010 N/A 0 Maintenance of MIS 2007 2009 Annual Training & 138 SPMC-5 A ICB Maintenance of MIS State Level, District 15-12- 15-12- 31-12- 139 spmc-7 P level & Village level 20.00 CQ 5-10-2008 05-03-2009 N/A N/A N/A 0 2008 2008 2008 training State Level, District 15-12- 31-12- 140 spmc-7 A level & Village level CQ 5-10-2008 05-03-2009 2008 2008 training Hiring the services of Parsar Bharti All India 10-06- 15-06- 141 spmc-8 P 11.00 SSS N/A N/A 18-06-2008 N/A N/A N/A 30-11-2008 N/A 0 Radio for relay of 2000 2008 jingles for three months Hiring the services of Prasar Bharti All Parsar Bharti All India 05-06- 11-06- 4872 / 10.91 / in 1091000. 142 spmc-8 A 10.91 SSS N/A 19-06-2008 N/A India Radio / 0 / 03-11-2008 Radio for relay of 2008 2008 lacs 00 Indian jingles for three months Hiring the services of 15-10- 15-10- 20-10- 2008-12- 143 spmc-9 P public relation & 12.00 QCBS 5-9-2008 15-11-2008 N/A N/A 31-12-2009 N/A 0 2008 2008 2008 31 Advertising Agency Page 21 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.09 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Hiring the services of 04-11- 10-11- 6491 / 14.72 / in Buzz Imc / 0 / 1472000. 144 spmc-9 A public relation & 12.00 QCBS 16-9-2008 19-11-2008 31-01-2012 2008 2008 lacs Indian 00 Advertising Agency Hiring the services of Parsar Bharti All India SPMC\CCD 31-12- 07-01- 145 P Radio for road shows 10.00 SSS N/A N/A 06-02-2011 N/A N/A N/A N/A 0 U-41 2010 2011 through electronic media publicity Hiring the services of Parsar Bharti All India SPMC\CCD 31-12- 07-01- 146 A Radio for road shows SSS N/A 06-02-2011 N/A U-41 2010 2011 through electronic media publicity Hiring the agnency for SPMC\CCD providing support to 31-08- 07-09- 2010-12- 147 P 60.00 QCBS 19-4-2010 31-8-2010 06-10-2010 N/A N/A N/A 0 U-47 Stage IV of project 2010 2010 03 scheme cycle Hiring the agnency for M/s Wapkos SPMC\CCD providing support to 03-11- 04-11- 6080 / 83.67 / in Limited, 148 A 70.00 QCBS 17-3-2010 23-12-2010 85 0.00 U-47 Stage IV of project 2010 2010 lacs Gurgaon / 0 / scheme cycle Indian Partnership support for community mobilization in the districts of SPMC\CCD 149 P Ludhiana, Sangrur, 84.00 FBS 21-4-2010 N/A N/A N/A 0 U-48 Ferozepur, Bathinda, Nawan Shehar, Gurdaspur & Moga Partnership support for community mobilization in the districts of SPMC\CCD 150 A Ludhiana, Sangrur, FBS 21-4-2010 U-48 Ferozepur, Bathinda, Nawan Shehar, Gurdaspur & Moga Page 22 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.09 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Hiring the services of SPMC\CCD public relation & 20-10- 30-10- 151 P 15.00 SSS N/A N/A 30-10-2010 N/A N/A N/A N/A 0 U-49 Advertisement agency- 2010 2010 Extension Hiring the services of SPMC\CCD public relation & 152 A SSS N/A N/A U-49 Advertisement agency- Extension Production of 8 video SPMC\CCD 153 P documentaries on best 8.00 SSS N/A N/A N/A N/A N/A 26-08-2011 N/A 0 U-52 practices Production of 8 video Genesis Media SPMC\CCD 09-03- 11-03- 4897 / 6.80 / in 661800.0 154 A documentaries on best 9.00 SSS N/A 24-03-2011 N/A Pvt. Ltd. / 0 / U-52 2011 2011 lacs 0 practices Indian SPMC\Fina 16-08- 155 P Internal Audit 5.00 LCS N/A 18-09-2010 N/A N/A N/A 0 nce -44 2010 Gianender & SPMC\Fina 16-08- 270553.0 156 A LCS N/A 18-09-2010 281 / 2.50 / in lacs Associates / 0 / nce -44 2010 0 Indian SPMC\Fina cocurrent Financial 20-08- 25-08- 157 P 5.50 LCS N/A 20-8-2010 30-09-2010 N/A N/A N/A 0 nce -45 Review 2010 2010 Aggarwal A. SPMC\Fina 20-08- 25-08- 5937 / 24.69 / in Kumar & 761451.0 158 A LCS N/A 30-09-2010 23-06-2011 nce -45 2010 2010 lacs Associates / 0 / 0 Indian Hiring Services of imparting training on SPMC/Proc- 159 P WB procedures to 19.00 CQ 1-1-2008 N/A N/A N/A 0 20 officers of DWSS punjab Page 23 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.10 Consultant/Nationalit Expenditure incurred Advertising for short Proposal (Technical) y & Zip Code. If USA Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) Last date of Contract Award Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Receipt of Plan/Actual Value(Lac) Name of to date RFP Proposal (Date) (Date) (Date) Lacs) Sr. Package Description of WBR Issued (Technical/F No. No. Services No. (Date) inancial/Co mbined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Hiring Services of imparting training on Crown Agents SPMC/Proc- 01-04- 22-04- 7666 / 18.98 / in 1321000. 160 A WB procedures to 19.00 CQ 15-2-2008 India Pvt. Ltd. / 30-05-2010 20 2008 2008 lacs 00 officers of DWSS 0 / Indian punjab Hiring Consultancy Services for Post SPMC/Proc Procurement Review 21-07- 23-07- 161 P 5.50 SSS N/A N/A 08-08-2010 N/A N/A N/A N/A 0 urement-50 for the contract award 2010 2010 uring the period 01-07- 2008 to 30-06-2010 Hiring Consultancy Services for Post Arun Kumar SPMC/Proc Procurement Review 20-07- 16-08- 11566 / 6.66 / in 566000.0 162 A 6.66 SSS N/A 18-08-2012 N/A Shrivastav / 0 / 15-03-2011 urement-50 for the contract award 2010 2011 lacs 0 Indian uring the period 01-07- 2008 to 30-06-2010 Performance SPMC\Tech Improvement of 08-12- 11-12- 2010-05- 163 P 170.00 QCBS 3-1-2009 8-12-2009 29-01-2010 N/A N/A 15-07-2011 N/A 0 nical-42 Existing Water Supply 2009 2009 28 Schemes Performance Center for SPMC\Tech Improvement of 08-12- 11-12- 2010-03- 5933 / 209.28 / in Social & 164 A 170.00 QCBS 3-1-2009 29-01-2010 31-01-2013 43 0.00 nical-42 Existing Water Supply 2009 2009 25 lacs Environmental Schemes Care / 0 / Indian Sansitizing Local SPMC\Tech 25-06- 28-06- 165 P Enterpreneurs of O&M 24.00 QBS 25-6-2010 29-07-2010 N/A N/A N/A 0 nical-43 2010 2010 of RWS Schemes SPMC\Tech 166 A QBS nical-43 Grand Total: 83 3367.87 722.81 Page 24 of 24 Procurement Plan For Cosultancy 16/11/2012 19.31.10