z -i = _ _ _ _ = SL 2 E1406 v 4 . . Shaanxi Ankang Road Development Project EIA and EP Execution Frame of The Local Road Improvement Program ..; s ChangAn University Feb. 2006 XisanS China SCANNED Preface Shaanix Ankang Road Development Project means the World Bank loaned Ankang -Maoba expressway(AME hereinafter) and the local road improvement program. This project covers thoroughly 3 poor areas in Ankang, namely, Ziyang County, Langao County and Hanbin District. 108 local roads are supposed to be improved. Among them, 61 roads are located in Ziyang County, 717.39km long, including 74.5km in province level, 172.684km in county level, 113.110km in town level and 357.100km village road. The overall investment estimate amounts to 109.0416 million yuan; 18 roads in Langao County, 279km long, including 176km county road, 12km town road and 91km village road; 29 roads in Hanbin District, 507km in length, including 115km county roads, 88km town road and 304km village road, totally 121.4995 million yuan investment. The overall investment for the whole project will be 444.8266 million yuan, totally loaned out ofthe World Bank. Under the request of the project execution and WB loan items, Ankang Traffic Bureau has completed in June 2005 the first draft of the whole project feasibility report. In Nov. 2005, the local road feasibility report is renewed and improved. In accordance with the Regulations for Construction Project Environmental Management and Environmental Protection Law of PRC, Shaanxi Communication Dept. consigned ChangAn University for EIA work. ChangAn University constitutes the project El team and performed the field survey in July 2005. Then, expert consultation and public participation are well done. To reach the EP target in EIA and control or mitigate the negative impact from the construction, ChangAn University in Sep. 2005 drawn up the initial Shaanxi Ankang Road Development Project EIA and EP Execution Program. In Sep.2005, it was amended and completed after the WB expert checkup and suggestions. The further request and suggestions from WB experts in Jan. 2006 brought in the completion of Shaanxi Ankang LRIP EIA and EP Execution Program. According to the construction program, 28 local roads in 2006 will be rebuilt, 34 roads in 2008, 26 roads in 2009, and 12 roads in 2010. The Shaanxi Ankang Road Development Project Memo subscribed by the WB team requires the primary year 28 local road EP action, including 9 local roads in Ziyang County, 8 local roads in Langao county and 20 local roads in Hanbin district. On the basis of the given principles, the execution schedule decides the EP execution plan. Great thanks to the support and cooperation from such organizations like Shaanxi Dept. of -' Communications, Ankang Traffic Bureau, Ankang Environmental Monitoring Station, local boards of traffic, EP and forestry etc. Shaanxi Ankang Road Development Project EIA Team March, 2006 I W, t Sketch Map 'Joo O0 A g !I Shaanxi Ankang Hi ghway Project ato;-4 4 ON AN I't x eV* -EN V e 994 410. % ... a k o At Our 04# XA, 46 % I If N AN 't IfWV Y,-g 40, 4 .4 4 4 i .4w, -NA lwIt'A V ram ,, !*"i 2- "A *e of A g -4 T-Ni.;' No fe 7ir e I-Z f a N 4kNk A), Sin World Bank Loaned Countryroad Program of Shaanxi Ankang Highway Development Project 1, Kuian 28 Hongyangcun 55 Maowa 82 Quanhe 4%In 2haoliu 29 Yudu 56 Maolian 83 LS"Ca* 3Sangzhen 30 Landa 57 Gaorao 84 Shenmo 4Hongniu 31 Minkeng 58 Gaobai 85 Guoten 5Danlin 32 Daguan 59 Gsowan 86 Louhu 6Xiangshan 33 Shipua 60 Banjie 87 Da 7Nanying 34 Tiefumiao 61 Wongshang 88 Pailou as A 8D an 35 Fengbong 62 Yunfcng 89 Sanping 9Xinbatil 36 Xi,xi 63 Xianglu 90 Maoxin *13 IO Qixincun 37 Yuchong 64 Liadfcn 91 Ranpgou aisto legend It Wangcanzi 38 Liulin 65 Shijaicun 92 Desneng 12 Baimasbicun 39 Shizi 66 Paotai 93 Watan County -ICNCI OPOPOPM ciiy Expremway 13 Shuangpingcun 40 Dachun 67 Tianchang 94 Luzhu County hovincial 14 Bailonoquen 41 Guanbei 68 Xinma 95 Anping 15 Yongqing 42 Hustai 69 xi,,,q'in, 96 Laozhuang Town.hip County 16 Xiangshancun 43 Qiba 70 Tnsmogou 97 Yantang &i 17 Zhonggoucun 44 Mogou 71 Nanmu 98 Lazhu 8Canpingeun 45 Xingfu 72 Jiapin 99 Dalian 'S.7 19 Yugonscun 46 Xinhua 73 Wahei I00 Wongmiiio 20 Zhouwaneun 47 Tuanyuan 74 Chefeng 101 Duanjiggou 21 Niu3hancun 48 Yuehong 76 Huoya 102 Liangan ti.#A 22 Manicun 49 Gunsan 76 Jinpeng 103 Cheihai 0 23 Husixhucun 50 Dongshuang 77 Yuanqiming 104 Shuyan 24 Taipinfcun 51 Waliao 78 Dazhong 105 Qingyan 25 Liangtiancun 52 Quanhui 79 Jjlm' 106 Shuimo 26 Gaojialiang 5 3 Dongda 80 Tienstengqiao 107 Shangliu 27 Qunyacun 54 Gaotic 81 Hcjiapu 108 Chanwan Fig. 1 Geographical Location of AME and LRIP kketch Map Jf S,i Shaanxi Ankang Highway llroject tooloooll 14 MI ,_!_Lt e N IA -To Ata 7'.71 44V kt .'4t, 4*1k: lao _7 i v Ii 1.11K .9 StA 7 4k fit v'!p 4u TAT -it C-Z _J -74 it World Bank Loaned Countryroad Program ofShaanxi Ankang Highway Development Project 3 Sangzhen 33 Shiguan 64 Lianfen 9 Xinbatielu 37 Yuchong 60 Banjie I0 Qixincun 46 Xinhua 65 Shijaicun Jan a N4 * legend I I Wangcanzi 47 Tuanyuan 67 Tianchang Counly -lewl cloy Exple-way Count) 13 Shuangpingcun 50 Dongshuang 82 Quanhe County Ro" 15 Yongqing 51 Waliao 93 Watan 20 Zhouwancun 52 Quanhui 98 Lazhu Xk. lown.hip Kood A A 103 Cheihai 28 Hongyangcun 55 Maowa 105 Qingyan 30 Landa 59 Gaowan N, 1,- 1. 3011000 108 Chanwan Fig.2 LRIP construction in 2006 $~~~~ f * ~ ~ ~ ~ q ~~~~~~~ IL a *t )n - Hen~ 1 , it,,, ,, , r - ;V h1iii - 5--tt 5' I~~~~~~~~~~~~~~~~~I a t 4 - X~~i;angyangs To--.--s t + - a 0tJ ~ 4tn ) g ll~ aobaToirtship \ ,!i f _ .) > * *h - - 'N . Ir * i , S i LRIP A _s N~~~~~~~~~~~~~~~N \,_; ' '''' 1 * s.s-"-, ','.,T. ) S~ ~ . 3 tttte4I g E7k,&~~~~~~~~~~~~~~~~~~~~~~~ Fig.3 Water System in LRIPAreas s =s ~~~~~~~~~~~~o. >~~~~~~~~~~~~~~~~~~~~~~~~~~~r- 0,<,,,__,9~~~~~0 --- f~~~~~~~~~~~.0 1,s itAc 4 ~~~~~~~~~~~~ILFnhog Foom Pat @vrk--X8 * *\ -~~~~~~~~~~~4 f'- 9~~ ~ ~ ~~~~i * -- to A -- -g * 11..r4 pi f--:-, l - i.~~~Sldtlyua Fte'; iP ci --r,J!-,˘˘ .At;astrt + t k Klj .i d~- l.;,. , x ,t (_t f5;| I, fn fr:ttwia~~~~~~~~~~~~~~~~ -j-t I- ,, + 6 ~ ~ . itsOoOt .-' itJ FigA4Vegetation inAnkang City ,o !tiAi *tlult:tfi O t~~~~~~~i I~~~~~~~~~~~~~~~~~~~~~ tioDsr i °~ 12 * Oj4s,, <.~~~ to I Io t j i&jf' O040 ' oJX1 j~~~~~~~~~~~~~0 _j-~~~~~~~~~~~~~~~~~~~~~~~~~1S_ X1 R°@ I I-A -j) ~ ~ e ini' tlt f' 4,l,ll hL\> ~ + It ,l * Il.lt\\.llltsttto [..\\vi1; n Ut z,t;, o B 47 Tuanyuan rebuild o © o O A o B Note: "4 "as primary El:"A"as secondary El; "O"as minor El; "©"slightEl; "o" as gentle El; "o"asneglectable El Table 4-7 Co ntryroad Project El Screening In Ziyang County Factor Property Biology Water Air Acoustic Soical Scenic EIA type Order name 48 *Yuzi rebuild (© A o © O o B 49 *Gunsan rebuild ©3 A o o O (© B 50 Dongshuang rebuild (© A o O o0 B 51 Waliao rebuild © © a A B 52 Quanhui rebuild (© A o o ©D O B 53 Dongda rebuild A a © K o 0 B 54 Gaotie rebuild ©D A o O © o B 55 Maowa rebuild (© o o A O ©D B 56 Maolian rebuild (© A o © O 0 B 57 Gaorao rebuild a o o A O (© B 58 Gaobai rebuild © a D O A (© B 59 Gaowan rebuild © o o A O (© B 60 Banjie rebuild © o n A O © B 61 Wongshang rebuild © A o ©3 O o B 62 Yunfeng rebuild © o o O A a B 63 Xianglu rebuild o o A K O © B 64 Lianfen rebuild (© o o O A @ B 65 Shijaicun rebuild a a K A ( B 66 Paotai rebuild ao a K O A B 67 Tianchang rebuild ( o o A O © B 68 Xinma rebuild © o o A O (© B 69 Xingqing rebuild ao a A O © B 70 Tangmogou rebuild ©i o a O A © B 71 Nanmu rebuild a A Kl©B 72 Jiaping rebuild © o a A O © B 49 EIA andEPExecution FrameofLRIP 4 EnvironmentalProtectionManagementFrame Table continued 4-7 Country oad Project El Scree ing In Zi ang CountY EIA type to---actor ---- Property Biology Water Air Acoustic Soical Scenic Order name B 72 Jiaping rebuild © o oE A O © 73 Wanhei rebuild (© o o A B 74 Zhifeng rebuild © o l O A B © B 75 Huoya rebuild © o o A O B 76 Jinpeng rebuild a El A © B 77 Yuanqiang rebuild ( A c o O © B 78 Dazhong rebuild © A o o O B 79 Jiming rebuild © o El A © © B 80 Tianshengqiao rebuild © o A O B 81 Hejiapu rebuild (© o oi A O © B 82 Quanhe rebuild ( o o O A B 83 Lancao rebuild © o oi A O B 84 Shenmo rebuild © 0 Ci > A © B 85 Gaotan rebuild (a o El A O © B 86 Longhu rebuild o 0 K A © B 87 Daba rebuild © o Co O A B 88 Pailou rebuild © o o O A © B 89 Sanping rebuild o 0 c K O A B 90 Maoxin rebuild ©3 o o A O B 91 Ranggou rebuild (© o oi A O © © B 92 Desheng rebuild © 0 o A B 93 Watan rebuild 0 K O A B 94 Luzhu rebuild o0 K O A (© B 95 Anping rebuild (© o Co O A B 96 Laozhuang Rebuild o o KO A B 97 Yantang Rebuild © o o> ci A D © B 98 Lazhu New o0 o> A B 99 Dalian New i o A © B 100 Wongmiao rebuild o o K O A B 101 Duanjiagou rebuild © o o O A IL (© B 102 Llangan rebuild © o n O A B 103 Cheihai rebuild . 0 o K A B 104 Shuyan Rebuild 0 o K A _ B 105 Qingyan New o0c K> A © B 106 Shuimo rebuild (© o o A O (K) B 107 Shangliu rebuild (© o o A O (© © B 108 Chanwan rebuild o0 c I A O Note: "4I"as primary El; "A"as secondary El; "O"as minor El;"'"slightEl: "o" as gentle El; "n"as neglectable El 4.2.3.5 Main contents in EIA For a better understanding and easy performance by the local EP units, the main contents of EIA work possibly occurred are represented in table 4-8. 50 EIA and EP Execution Frame ofLkIP 4 EnvironmentalProtectionManagement FI-ame Table 4-8 Main EIA Contents in Ankang Countryroad Project Order Section tape Contents Lbalance ofearth and stone works; I Heavy rolling 2.quarry, borrow or spoil site, their possible impact and relevant conservation measures. ILcorrelation between the project and river or reservoir; Passing by or over river and 2. river and reservoir status, including hydro and water quality data; 2 reservoir 3. road within drinking water zone, bridge works or camp sewage discharge; 4. bridge removal or rebuild, its constructon, impact scope on water environment. 1.survey of coorelation between school, hospital or residential and the road, 50m within distance; 2. sampling of noise monitoring; 3 Passing by school, hospital, 3. impact from the road construction on them, noise control measure; or residential 4. sampling inquiry for public participation. I. cultureal relics within I00m, of its protective level,target and scale; 4 Passing by cultural relics 2. correlation betweenteh road and cultural relics, impact, and impact degrees; (remains) 3. inquiry for public participation. 1. acknowledgement of wood status, protective degrees, wood age, circumference, crown, 5 Passing by ancient woods significance etc; 2. correlation between the wood and road, impact and measures. 1.acknowledgement oftaking offarmland, size and papers for permission; 6 Passing by protective 2. impact on farmingland and measures. farming land 1.land requisition and removal, its quantities; 7 Land requisition and 2.public consultaion by requiry or symposia; removal 3. resettlement measure. 1.nature reserve status, protective level, target and functional divisions etc; 2. road alignment, relationship between the project and the reserve, impact, EP target identifications; 3. acknowledgement of agreement and paper from its management; Going through nature 4. anknowledgement of local reserve protection plan; 8 reserve 5. practical works, direct and indirect impact; (resort etc) 6. alternatives and partial selection analysis; 7. public consultation, inquiry or symposia. I. engineering survey, alignment, work amounts, earth and roadworks, procedures etc; 2. inspection of land taking, passs by spots like school, hospital,nature reserve, resort, river, j reservoir, cultural relics, ancient woods etc, resettlement etc. 3. draft alternatives; 4. public consultation, inquiry or symposia; 5. any other similar content, ditto. 4.2.4 Enviornmental Protection Measures The framework focuses on the possible problems in environment at different phases before some relevant measures are brought forward. In consequence, the local EP managements can select what they need to minimize the ill impact from the countryroad construction. 51 EIA and EPExecution FrameofLRIP 4 Environmental ProtectionManagenment Frame 4.2.4.1 In design phase In design phase, some practical EP measures are drawn out on the basis of each road feature. All these designs are supposed to be executed in construction map and the practical measures are fulfilled by local traffic agencies. 1. General road sections EP measures at design phase shall take the following into account: © The majority of countryroad project focus on rebuilding. To make best of the current roads, the road designing shall be optimal and resonalable in road selections. Less farmland taking, less removal and shrinkage of slope in retaining wall construction when fill works appears at farmland, shall be important factors in designing. ©Try to avoid or pass by water bodies, in addition to segregating with greens, from water pollutions. ) Design on natural rivers shall be based on inconvesion of river direction, and no rerestriction, or block of river courses. Intersectant channels are designed with culverts. Runoff and ditch water are designed to be discharaged into given area. Free ejection into water bodies or farmland may contaminate the neighboring land and water sources. (A)The selection of country road shall be coordinated with town programming, away from schools, hospitals, villages and towns in dust and noise. Otherwise, some measures are to be taken to mitigate such traffic noises. (5) Design of subgrade shall consider the adaptation to landform, avoiding the damage to natural terrace and vegetation from high fill, deep excavation and inbalance of soil and stone works. Design of bridge, cultvet and drains shall meet the needs of flood discharge, cause no damage to local irrigation system. ® Virescence works well for subgrade stability, water and soil conservation, and surrounding beautifications. Accordingly, a comprehensive design is needed through the countryroad system. (©)Construction periods are reasonably arranged, avoiding the busy seasons in spring or harvest, and local villages shall be nitified before work. It is obvious that the consideration of designing and EP measures like less farmland taking, water protection, noise and air prevention, soil and biology protection in designing can guarantee the ill impact on environment to a minimum. 2 . Typical sections (sensitive sections) ( I ) Heavy rolling or 50m within water bodies In design, shields at road sections by valley, river or reservoirs shall be installed, marked with apparent signs for traffic safety. (2) Neighboring drinking water area To protect the drinking water for locals, ditches along the water bodies are supposed to design to avoid runoff or waste water flowing into directly the drinking water area. Furthermore, no outfall of the ditches can be set up within the protective regions. (3) New road sections New road section shall concern about the route selection at principle of "no destruction is the best protection". Reasonable and optimal design of alignment means less farmland taking, away from seneitive areas like school, residentials etc, away from bad geologic section, and away from cultural relics or ancient woods. 3. Basic farrmland protection ( Basic farmland adjustment and supplement shall be presented in local land programme in Ankang, after the land taken by the road engineering is approved legally. (2) Available ways to publicize the locals of the road work significance and regulations on resettlement, 52 EIA and EPExecuetion Frame ofLRIP 4 EnvironmentalProtection ManagementFrame removal and compensations shall be taken for better understanding and extensive support. ©Try to take less farmingland by cooperation with local hydro and biologic organs for best selection of borrow site placement and land renewing in the future. ( The project purposes at improving local economic and social conditions. All working and manageing units shall respect for local willing, with no violent land taking, removal and invasion of local properties. Occasionally, when design can't avoid taking of basic farmingland, papers for approval is needed before land requisition. That will be good for later land adjustment and supplement. Local properties are guarded by strict execution of national laws on compensations. 4.2.4.2 Construction Phase 1.General road sections ( 1 ) Ecologic protection (D The EP publicizing and training of working staff is necessay. All the working units shall assign such personnel in charge of environmental protections to prohibit the working staff from hunting of wild animals and the free enlargement of farmingland and grassland, so as to mitigate the ill impact on loca ecology. Only necessary cutting within sighting line are allowed, but no more beyond the limit. It is strongly recommended that explantation should be taken for some keyly protective plants, the same to some young trees, to be cut in design at conditioned sections. All cut and embankment slopes shall be greenized and protected. ( No picking of stone, sand and earth in forestry region is allowed, ruled in The Forestry Protection Law of PRC. (E) Keep smooth of the farming and irrigational works, as well as the country roads. When construction work involves, keep them working in priority before dismantling. (A)In construction phase, the temporary land use is supposed to be restricted within the land to be requisitioned. Renewing of these used land (in and out of the road bound) goes after the completion of construction. (l In construction phase, spoil site and discarding process shall be integrated with local agricultural developemtn and farmland planning, in arrangement with loca land management. After the engineering, spoiled land shall be leveled and greenized. (©)Spoil piling concerns materialistic stability. Residues are to be tampled and fixed before ripe soil coverage for new plantations. @)Before the construction, some educational work must be done along the project route. At worksite and somewhere around the worksite, especially the environmentally sensitive spot, EP concerned plates are installed, on which some information of ecologic protection, relevant laws and regulations, measures to be taken, construction signinficance etc are publicized. Futhermore, it is suggested that the construction organizations and units constitute altogether the EP rules of rewards and punishment, so as to definitize the responsibility and to promote their sense of responsibility. (2) Water and soil conservation 0 Keep balance of cut and fill in construction; excavation, refill, rolling and slope protecting perform at the same step. © Try to shorten the construction periods, lessen the lossen surface exposition and arrange reasonably the working time, accordingly, away from the rainy and floody seaons for less soil erosion. (I Try to decrease the damage to local vegetations by timely planting, renewing the worksite and places within the road boundary. (a) Such measures as retaining wall, counterfort or mortar rubble masonry shall be taken for high filling or deep excavation sections. 53 EIA and EPExecution Frame ofLRIP 4 Environmental ProtectionManagement Frame (®)Spoils on farmland proceed after removing and piling of current farming soil outside, then these soil can be renewed again after completion of works. (©) When the works end, temporary land shall be returned timely to locals for new farming. The construction unit must guarantee the temporary land to be cultivatable. @)Reasonable excavation work can ensure the earth and stonework not to be discarded at will. It shall be piled at easy place for refill later on. ( Measures like retaining or drainage works are taken before spoil and residue discarding. (3) Acoustic Environment Low noise machineries are priorly selected. With good maintainence and operation, the machinery noise can be managed at minimal level. 0 Noise in construction phase comes mainly from construction machineries and transport vehicles. The constructon units are required to choose standard utensils and vehicles in low noise degrees. The vibrating machineries are supposed to fix up some additional deoscillators. Accordingly, the reduction of noise intensity can be reached, in assistance with good maintenance ofall these machineries. (0) Intense and long-lasting noise on houman body can place an premium on varieties of diseases and bring in deaf. For the protection of public health, the construction unit shall make reasonable arrangement, like operating the noisy machinery by turns, shortening the contact periods under intense noise, and maintaining the machinery at minimal sound level. All working staff neighboring the high noise are provided with earplugs, and time periods can be shortened sometimes. ® Sound out of construction machineries presents bursting out, iregulate, discontinued with high strength. Investigation indicates there exist 4 noise levels at worksite. Alteration of working measures can mitigate the intensity, such as high leveled work at night hours (06: 0022: 00), or adjustment of machinery operation at right time. In addition, contractors are demanded to initiate civilized construction and more efficient management, such as the less material transport or knocking in construction phase. ) Within the distance close to the route, 150m away from the route at residentials, strong noisy machineries suspend work at night (22: 00-6: 00). At some worksites, continuity of working is a must, and the construction unit shall keep touch with the local EP bodies for nightwork permit, publicize farthest the locals for understanding and try their best to perform some measures, like moveable or temporary sound barriers etc. (0) Construction transit shall be positioned away from local residence, schools or some other sensitive spots. Night transport suspends as there exist some rows of residence 50m within the transit. As some transit transport can't stop at night, no blowing and speed limit signs are supposed to mount, of the night speed less than 20km/h. (©)Mix and material stations >200 m from sensitive spots. ( If strong vibrating construction occurs at villages, inspection for local houses shall proceed in case of accidents. Heavily impacted houses from vibration need indispensable remediation. (4) Air pollution ) Cement soil mixing along the route could be the mamimal pollutant source. Such work shall suspend when wind speed exceed grade IV, and all dispersible material load and unload like lime must be dealt with dusting. (2) Concrete mix station is a fixed pollutant source. The devices shall be sealed, installed with dusting device in grade II, and the workers are to be guarded with available measures. The mix station and plant are placed at open space, at least 200m leeward beyond the residential, shool or hospital. (I Good management shall be taken for dispersible materials,like earth, cement, lime transport and temporary storage. Shelter and blocking can be performed to avoid the atmospheric pollution. Exposed road and worksite are to be sprinkled regularly. 54 EIA and EPExecution Frame ofLRIP 4 EnvironmentalProtection Management Frame (4) Construction units shall choose machinery and transport vehicles under standards, such as gas exhaust tallied with the state criterion.Good maintenance will be good to easy control ofexhaust. (5) Working staff is apt to be effected by the environmental pollution. Measures for protection and safety are to be taken, like less working hours or respirator providing. (5) Pollution of water environment Water for wasing machieries and transport vehicles can be released only after settlement in tanks. (X On some rolling sections by river course, the subgrade excavation shal be set with settlement tanks at possible runoff to hold up mud and sand, so as to prevent the river course from stagnation. The soil settlement tank (Im deept) has its size on the basis of the size to collect water, and positioned at right area. When needed, geotextile is used to enclose the side for water outing. After the works, level the tank and green the land. (®)Worksite shall be away from rivers, and sewage and garbage are gathered for proper treatment before its release into water. Toilet and septic tank deal with the sewage before it works on irrigation and works as fertilizer. Garbage is gathered at right spot. (©)Mechanic oil leak out of machines and ships or pouring of oil residue will bring in contamination of water bodies. Strict management and education are needed. (A)Construction materials like asphalt, oil, chemicals etc are not piled by irrigational wells or rivers. Sometimes geotextile can be used for enclosure and prevention from those entering into water bodies. (®)In construction phase, subgrade must be suppressed to avoid the erosion. Surface works in rainy reason shall primarily be abstained, or asphalt residues come out and flow into rivers. Timely rolling and grinding can prevent from erosion. (®3 Waste water out of precast plant and mix station is discharged only after the treatment in settlement tank. Undisposed sewage discharge is strictly prohibited. (6) Solid waste treatment In construction phase, garbage sources mainly from living camp. All wastes are gathered by sorts, the same to the oil rags. Normal daily rubbish out of working staff shall be gathered before treatment by the local health board. (7) Cultural relics protection During construction, if there find some relics unearthed, the construction units shall suspend the work and keep the site normal before a report to the local governments or local cultural relic organizations. The constructon continues only after the relics treated or cleared out. 2. Special sections (I ) 50m within the water body 0 All injurants like oil or chemicals are not to be piled close to theriver,ditch, pond, well etc.; the dispersed materials shall be covered , or cloth enclosure in case of rain wash into the water bodies. ©)For some bridge or culverts engineering, machineries shall be managed in good order to avoid oil leakage, dumpage into river courses. Residues produced in water works must be stored on banks. (2) Section close to drinking water source © In scope of drinking water source, it is not allowed to let or dump any waste water or residue. Some measures to prevent seepage, overflow or leadage, must be taken to clean out the waste water and residue out of the range. ( Piling of cement or other construction materials or chemicals is prohibited on banks of water bodies for drinking. (3 ) Sections within 50m from residence or school (DWorkste and road for material transport shall be sprinkled timely, and dust can be avoided. (©)Reasonable arrangement of working hour within S(m from school and residence will prevent the 55 EIA and EPExecution Frame ofLRIP 4 EnvironmentalProtectionManagement Frame high noisy machinery from disturbing local life. Such machineries suspend their work frome 22:00 to 6:00 a.m. and from 12:00 a.m. to 1:30 a.m.. (I The transport of materials at time periods like on duty or off duty could lead to unneceassy traffic jam. Such traffic shall decelerate and prohibit whistle passing by school. (A)At some strongly impacting area like school or hospitals, the construction unit build up sound barriers before their work. (4) Sections with ancient or noted trees or culturally protective unit (D Before construction, the working staff will be educated or trained about the sense of protections on these ancient, noted or protective buildings. Caution board are installed at these sections. ( No earth and stone piling or building on these trees are allowed within the proective area (5m within the tree crown shadow). (X Low vibrating machineries are introduced to operate. No damage to the relic buildings or its attachments from construction or staff activities is allowed. When needed, it is suggested that some protective establishment are set up between the construction and the protected. (5) Aection with camps At construction camps, temporary sesspool is needed to collect waste water out of life. All these sewage can be valuable for farming land, buth it can't be discharged into irrigational canal. The pond and garbage pit are supposed to be removed and covered with earth. (6) Roads involved natural protection reservation The Kuqi and Haoliu roads are location in Ankang YngHu Lake Natural Aeservatioyinghu natural protection areas. These two road should notice at the follows in design and construction phases. Prohibit setting residue site and materialsite within reservation. After implementation finished, must recovery temporary occupied land in reservation as pre-function. Protect every facility within reservation. Standardize implementation team, prohibit building worker prey wild animal in reservation. Pay attention on safely using fire at construction site. Prohibit casting or piling living wastewater and rubbish of project site in YingHu Lake Marsh Natural reservation. 4.2.4.3 Operation phase 1.Biology (X Special agency is needed in operation phase for biologic protection along the route. ( The execution and cashin of the biologic expenses after work shall be pedged. (® The route vegetation in the country shall be reinforced by timely makeup, pruning and care, in order to beautify the route plantation and scenery. (X)Plantation recovery at spoil pot must be done. () Protection of basic farming land a. For less impact on the local farming land occupation, the construction units shall work with local governments for land exploitation and and renewing. b. The local land use programs are supposed to be adjusted to ensure the homeostasis of basic farmingland. c. Temporarily taken farmland in construction phase shall be renewed timely. 2. Traffic noise (DNo whistle sign at school section (j The villages and local government are encouraged , in accordance withlocal biologic program, to grow up more trees between villages and roads. 3.Air pollution control 56 EIA andEPExecution Frame ofLRIP 4 EnvironmentalProtectionManagement Franme Along the country road, trees are easily growing up.It is suggested that plenty of shrubs or arbors planted at especially the sensitive spots. All these vegetations can absorb some pollutants out of exhaust, mitigate TSP and beautify the local surroundings. 4. Water pollution and potential risk (j) All vehicles easy to leak and overload are strictly prohibited on road, in case of water pollution from the dissipated. (Q)To keep the Hanjiang river and its branches in good quality, caution signs are installed at banks. Prevention from risky accident must be well concerned in operation phase. 4.2.4.4 Measures and suggestion for impact on resorts (DRelevant EP agency and specified staff are coming into existence out of the constsruction unit for EP management and supervision in construction phase. At the same time, training of constsruction officials, technicians and workers on EP sense can help them to protect willingly. © The construction at resort sections shall be restricted in land scope by design, and the construction time shall be arranged reasonably at right season and right period of time. The optimized construction plan, as well as the advanced technics, ensures the soil erosion and destruction of the resort to the minimum. (®) Working camp and worksites are placed far from the scenic spots, particularly away from Hanjiang River, Renhe River, Yuehe River etc. (A)To protect the surroundings, stone collection and wood cut are strictly controlled in scenic area. (5) Bridge work at resort shall avoid the rain season. Water and soil conservation precede the erosive section work. For subgrade fill along rivers, blocking work takes the lead and then the filling to avoid rock from rolling into rivers. (©)Temporary land taking concerns camps and material spot at hollow and plant-sparsed section. Accordingly, the original vegetations are not to be damaged. Firewood for life derives from excavated shrubs or arbors, no new cut beyond the opening area allowable. Temporary land taking can't last long, and its original function shall be timely resumed and greenized. 4.3 Environment Management Plan 4.3.1 EMP in Project Feasibility Phase The main EP work in project feasibility phase keys on EIA of the project. ChangAn University holds up the project EIA. The EIA team selected 6 representaive roads for detailed field survey and investigation out of the planned 104 roads. According to the engineering amounts, the analysis on the possible environment impact in construction and operation phases bring forward measures for protections. Of other roads, relevant EP requests are pointed out by induction on the basis of their positions, engineering works,etc. For a good execution of these EP measures to avoid or mitigate the potential ill impact from the project, the EIA team, working with design units, has approached consistent agreement on the EP measures for operation and construction phases, and compiled this environment operation plan. 4.3.2 EP management plan in project design phase As most roads keep their original alignment, optimization is to be done in design phase. 4.3.2.1 Route selection ( I) The new road selection will take impacting factors into accountat,like less land taking, air pollution and traffic noise on local surroundings. (2) Most roads are to be rebuilt or partially reformed, on the basis of their current positions. (3) To avoid rock cutting, hill damage or less impact on local scenery shall be considered in route 57 EIA and EPExecution Frame ofLRIP 4 Environmental ProtectionManagementFramne selections. 4.3.2.2 Social disturbance Shortcuts are designed to free local production and life. 4.3.2.3 Soil erosion and land resource ( I ) In rolling areas, slope stabilization can be reached by varietiesof treatments to avoid soil erosion. At slopes with sizable cutting, designs are made to build up catchwork for excluding rainwater from flowing into soil joints or crackes, which results in sliding. (2) Designs of drain and protection works are well done, to avoid runoff from washing hills, farmland or other facilities. (3) Good designs on earth and stone works can balance the fill and cut for less excavation. (4) 3487 culverts are to be designed to smooth the current water system. 4.3.2.4 Noise As the project area has a complex landform, hilly, dispersely populated, with few sound sources. Within the assessment scope, there exists good acoustic quality. Accordingly, noise is not the factor in design phase. 4.3.2.5 Scenery protection The project scatters in the heavy rollong mountains. Excavation of mountains must concern the protection of natural vegetation and leveling the cut slope. 4.3.3 EP Plan in construction phase In construction phase, contractors take the responsibility of environmental protection. FIDIC 19.1 rules: Contractors, in the course of construction, completion and defect mending, shall take all reasonable approaches to protection the worksite and its neighboring surroundings to avoid the damage or injury to humans and their properties from construction nise, pollution, or some other ill effect. Accordingly, the bidding document bring forward the following requests, in reference to EIA report and its engineering design. 4.3.3.1 Ecologic protection ( I ) Engineered waste water or residue to be disposed properly (2) Temporary land to be cleared timely for renewing after the project completion (3) To stop the land taking out of farming land, but taking and spoiling soil by design (4) To educate working staff away from injuring wild animals and plants along the route 4.3.3.2 Noise control measures ( I) Heavy noisy machinery suspend work during night hours from 22:00 to 6:00a.m. to generate peaceful nights for local people. (2) Some fixed machineries are placed 150m beyond the residentials. 4.3.3.3 Water contamination ( I ) Mechanic oil leakage and waste oil dumapage send pollutants into water bodies. Only cautions, and intense management as well as eduction can deprive such activities. (2) Construction materials like asphalt, oil, chemicals are not supposed to pile by well or river courses. Canvas is used to enclose and shelter from washing into water bodies by rainfall. 4.3.3.4 Taffic safety ( I ) Explosion section at very time shall strictly control entries of staff, vehicles or passerby. (2) No passing over bridges when its construction proceeds. 4.3.3.5 Cultural relic protection Anytime culturea relic is found at construction site, protect the scene and wait for the relevant organization for appropriate treatment. 58 EIA andEP Execution FrameofLRIP 4 EnvironmentalProtectionManagement Frame 4.3.4 EP Plan in operation phase 4.3.4.1 Traffic safety Falling rocks are cleaned up all the time in case of emergency. 4.3.4.2 Risks from dangerous goods transport Some emergency measures are to be draw up for dangerous goods transport, and such emergency teams are composed to deal with the possible incidents. 4.4 Environment monitoring plan The project environmental monitoring plan is shown in table 4-9. Table 4-9 Environmental Protection Monitoring Plan for Ankang Countryroad Pro ect phase Organ Monitoring content Purpose mTI 1. EIA report L.to ensure its entirety, topic aptness, prominnece 2. EPA 2.to ensure all possible problemstobe reacted WB Loan Office 3.mitigation with practible fulfillment Ankang Traffic Bureau 1.primary design and EPA Lexecution of EP Simutaniety and EAP 3 a WB loan office 2.EP investment execution 2.EP investment insurence c. Ankang Traffic 3.material site and mix station at 3.to ensure the satisfication of EP request at all °3 Local traffic right place sites bureau 4.dust and noise control at right 4. less impact on surroundings, explementation time periods of law and regulations 5.poisous or hazardous goods 5.1ess impact on surroundings, explementation of load and pile, pollutant discharge law and regulations I U WB loan office 6.sewage and residue discharge 6.groundwater unpolluted on . Ankang Traffic 7.spoil site renew 7.scenery and land not severly damaged c Local traffic 8.EP facility and 8.ensure EP measure insimultaneity bureau finalaccomplishement c) Shaanxi CR Dept 10.underground relics 10. cultural relics undamageable o l.execution of EAP in operation (b-, phase o 2.further EP measures for new problems Local traffic 3.environment quality at sensitive Fire dept spot under standard To ensure the safe traffic and living quality along 4. supervision to avoid the route emergency, emergency plan to be drawn out to dea with potential and sudden accidents 4.5 Environment Monitoring Plan 4.5.1 Purpose Environmental impact in construction phase stems mainly from living pollution from camps, water pollution from bridge works, noise out of machinery performance, stone exploitation, soil loss, asphalt smoke and dust in surface paving, etc. Environmental impact in operation phase stems mostly from environmental pollution from vehicle 59 EIA andEP Execution Frame ofLRIP 4 EnvironmentalProtectionManagement Frame exhaust gas, dust, or noise, and possible severe partial pollution from emergent accident. A mastery of route dynamic state along the route can be necessary for good service, easy monitor and management. 4.5.2 Monitoring organ The county monitoring stations from Hanbin District, Langao County and Ziyang County are consigned to do the job for their complete and technical device and professionals. 4.5.3 Monitoring execution Normal monitoring is executed in accordance with table 4-7 by the local stations. The key element among the monitoring is noise, to performed regular and mobile monitoring or sample monitoring. All the monitoring methods, targets, or training of different staff are confirmed in contract signed between the monitoring units and the project managerment. What the monitoring units to do is the follow the contract item and perform the monitoring by plan. The project of countryroad system features in quantitie of roads, each road in small size, but in large extension. Except for the 7 new road construction, all others are to be rebuilt, lasting short time periods. Because ofthe these specialities, all the followings must be noticed. (1) Environment monitoring goes with the new building road through constructon period. See the plan in table 4-7. (2) All construction road by densely populated villages, schools or hospitals need monitor in construction and operation phases. See the contents in table 4-7. (3) All the roads involved in nature reserves or resorts need monitoring, with higher frequency. Table 4-10 Environment Monitoring Plan (Noise) phase spot item frequency Time Sample executor In charge ~~~lasting ___________________ ___________ time Densely populated village: like Id, once Costuco Wangyan, (Kuqian Working Twice in in day Project Construction R) noise I yr and night Work hour Off. Jiangguo (Landa R) time Monitors Xintao (Yuzi R) tations of Initial operation Once in Hanbin, (2009-2015) Densely populated 2yrs Langao,a Mid-term village: like Id, once O nd Highway operation Wangyan, (Kuqian Traffic in day Once m Ziyang Manage (2015-2022) R) noise Once in I and night day and ment Long-dated Jiangguo (Landa R) yr. time night Dept operation Xintao (Yuzi R) (2022-2027) 4.5.4 Monitoring device, expenses, and report submission The monitoring units supply the devices for monitoring, and the local traffic bureaus defray some depreciation expenses. The depreciation expenses are contained in the overall monitoring expenses. Monitoring results are submitted by monitoring contract regularly; the annual reports are handed in prior to Dec. 30 every year. 4.6 Training Plan Road EP training is foundational for measure fulfillment. As a key factor in construction and operation phases, the environmental protection can be sustained by training the staff in environmental protection agency of all levels. A fully comprehension and acknowledgement of typical problems and its control 60 EIA andEP Execution Frameof LRIP 4 EnvironmentalProtectionManagenientFranme meansures will develop their management abilities. Shaanxi Highway Project II, assisted with WB loans, has been completed by the provincial Communications Dept. They have experienced the training of their managerial, at demand of the World Bank. All these officials are working for this new project with basic environmental managerment and rich competence. Shaanxi Communications Dept. has planed to deploy the training by grades. The primary training starts before June 2006 for environment managerials in traffic organizations from Ankang City, Hanbin District, Ziyang County, and Langao County. The contents for training include national environment protection laws and regulations, main environmental issues in country road constructions, highway feasibility study, environmental protection demands in design phase, mitigations of ill impact in construction and operation phase, as well as the issues about the project, like management of EIA, preparations, execution, supervision and report of environmental protection plan and monitoring plan etc. In later years, Ankang Traffic Bureau will take charge of further training for relevant staff in different organizations. All the local traffic bureaus including Hanbin District, Zinyang County, and Langao County take charge of drawing their own plans for regular training for their managerials and working staff. The training will contain some contents like rules and regulations, issues and measures for environmental protection and water and soil conservation etc, mentioned in EIA. Table 4-11 Environmental Protection Traini g Plan in Ankang Countryroad Project object Organ for content method Time and add. training Traffic 1.EP Panorama Traffic 2. EP laws After bid Construction bureaus of . lectures and supe nHanbin Dist. 3.EP demands in design phase Field Before the commcement 4. pollution and control in (details to be ascertained units LangaoZ, any construction phase conference by Ankang Traffic Bureau) 5.. EP technical norms 4.7 Public Consultation and Information Opening 4.7.lPurpose Public participation offers a chance for local people along the route to be members of the construction. By the consultation, the locals get good acknowlegement of the construction, of the possible advantages and ill impacts. Then they are able to table some proposals, find out some omits in resource discrimination, and reinforce the environmental protection measures and designs. Therefore, the project feasibility, more scientific designing, higher rationality and social acceptability can be reached. 4.7.2 Public participation organization and deloyment In accordance with relevant laws and regulations, as well as the project situations in Shaanxi countryroad project, the public consultation is organized by Ankong Traffic Bureau, and the EIA team is consigned to do the job. 4.7.3 Objects The objects come mostly from local officials, possibly impacting units, communities and individuals, so as to know of the local opinions and safeguard the local rights and interests to be impacted by the project. As the assessment works on all country roads at the same time, the large scope concerned needs public participation by sampling at the principles of the following personnel participation, that is, the units to be 61 EIA andEP Execution Franze ofLRIP 4 EnvironmentalProtectionManagement Frame involved: ( From the 7 roads to be newly built; (2) From roads crossing nature reserve or resorts is a must; & 50m from the drinking water bodies; (X)50m from densely populated areas like school, hospital or residentials; © From areas with cultural relic zone, ancient or age-old wood; © From large land requisition and removal; (©)From 20%-30% sampling out of the first group of commencement each year. 4.7.4 Measures It is suggested that the public consultation proceed by sampling questionnaires. Some representative items like road to link villages in poverty, road to link densely population area, or new building road etc, are dealt with by symposium along the route. To satisfy the WB loan requests for the items not sampled, it is proposed to post up the construction bulletin at villages concerned half month before.The local villages are easy to know of the construction content, time period, scope, and impact etc, even more in details from the names and phones on the bulletin. Such method could acquire support from the local people. In construction phase, project offices are set up in local traffic agencies in Hanbin, Langao county, and Ziyang county for visitors and suggestions. Local people can also express their advices by phone, letters, or E-mails etc for public participation. 4.7.5 Contents Contents following are included for public participation: (1) Project survey publicizing, and possibly producing impact on environment; (2) Public attitude toward the project; (3) Current environment quality along the route; (4) Social-economic impact from the project; (5) Public attitude toward the impact on local life and work; (6) Attitude and suggestions on compensation and resettlement from the concemed; (7) Requests and suggestions for environment protection and measures. 4.7.6 Information to be public The World Bank regulations on business policy demand the construction units publicize the environmental impact assessment document to the local communities and non-govemment organizations to be impacted. 4.7.7 Information issued After the completion of local EIA work, bulletins are to be issued, containing the following: GD News about the consignment of EIA report drawing; © Survey of the countryroad construction; ® Method and places to refer to the EIA report; (a) Details and time for public consultation. EIA report is supposed to be places easy to read, like the county library, data office, etc. also on public website or somewhere easy to touch. 4.7.8 Information feedback At all township governments, phones are set up to gather and record some environmental protection 62 EIA and EPExecution Frame ofLRIP 4 EnvironmentalProtectionAlanagement Frame complaints. In construction phase, all contractors must set up sign board and public bulletin for collection of suggestions and opening of data collectors and their phones. All local traffic organizations shall deal at field with the complaints timely, assisted by local governments. 4.8 Contract Responsibility For less impact on the local environment, construction activities are to be regulated. All such contents will exist in bidding document and contract in bidding phase. Construction units must include the items about environmental protection and relevant training in their tender book, the same to contract by the contruction units accepted. 4.9 Report 4.9.1 Environment monitoring report Such reports out of environment monitoring units by contract are submitted to local traffic organizations, and annual report before Dec. 30 each year. 4.9.2 Report on EP measure fulfillment Construction units submit the report on EP measure fulfillment timely to the county traffic organizations. Summary goes after the construction completion to be concentrated at Ankang traffic Bureau before their finally collection to the project office in Shaanxi provincial Communication Dept. 63 EIA and EPExeczution Frameof LRIP 5 FrameworkofExecution Progi-an of EnvironmentProtection 5 Framework of Environmental Protection Plan 5.1 The general table of environmental protection implementation plan The rural highway projects in design stage, construction stage and operation stagein Ankang, Shaanxi Province, will adopt environmental protection measures against the possible influences. The basic environmental protection elements can be seen in table 5-1. Each element should have its own corresponding environmental protection action plan, with measures and contents to be decided by the impacts on environment ofthe specific element. 5.2 The action plan of subitem environmental protection The protection measures, the implementation of the measures, management institutions and the institutions in charge of the rural highway developments in Ankang should be put forth according to the engineering features and environmental conditions of the element through the chief conclusion in the EIA. This report brings forth the environmental protection action plan of the 28 highways that will be carried out in 2006 including the 15 rural highways in the county of Ziyang, the 5 rural highways in the county of Langao and the 8 rural highways in the district of Hanbing. The whole mileage of the 28 highways is 449.75 kilometers at the total cost estimated of 172.961 million yuan. It is planned to put in 110.936 million yuan in 2006. Among which, apart from those highways as Shuangzheng rd., Landa rd., Shiguan rd., Tongshuang rd., Waliao rd. and Quanhui rd., which are annually invested, the other 22 highways are all fully invested once for all. The environmental protection action plans of the rural highways and their plans in Ankang in 2006 can be seen from table 5-2-5-30. 64 EIA and EP Execution Frame ofLRIP 5 Framework ofExecution Program ofEnvironment Protection Table 5-1 The general elements of environmental protection mangement plan of the LRIP Chief iion Insttion in dlarge vnmrinal environmental protection measures to be adopted and its implementation stage Misses. (I ) adopt kinds of techniques to keep slopes stable and avoid soil erosion (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. Fnivinen1Tt Shaaxi Provincial asmestunit Highway Bureau In design stage (3)forbid quarry and land removal inthe woods. (4) Prohibit setting residue site and material site within reservation. D Huryt (I ) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) inconsultation with the local management departments to make good plans of the land acquisition and dumping sites. In the process of construction, balance the removal and dump possibly, pile the dumping earthwork in fixed place and protect the sites in time and necessarily so as to avoid huge water and land erosion. (3 ) for the route along rivers, build ward-off projects to keep earthwork and cubic meters of rocks from dropping into Ecological the rivers along the route, and after the completion ofthe construction, seeds of the local vegetation are sown along the be filled in the ditches and Hanbing District environment In contrction side slopes and the river banks. For the surplus cubic meters of rocks in construction can contractor Traffic issues nstrugX covered with soil to restore farming. Department stage trenches along the route and thenand (4) Prohibit setting residue site material site within reservation. (5) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating indepth. (6) lands occupied by the makeshift projects should be cleared in time and handed over the local authorities for farming restoration after completion. Maintenance Hanbing District In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is section Department stage carried out to each specific section and appoint fixed staffto take charge. 65 EIA and EP Execution Frame of LRIP 5 Frameworkof Execution ProgramofEnvironment Protection Table 5-1 The general elements of environmental protection mangement plan of the LRIP Chef Implolritutiio innchage envinxl environmental protection measures to be adopted and its implementation stage is_n tion Shaaxi In design Protection design should be well made at the sections along the river side to avoid the side slope brushing up to affect the a=rmunit H iay stage water quality of the river. 8Dsnunitt Highway Bureau (I ) the domestic sewage and rubbish in the management quarters can't be discharged into rivers unless disposed of. Water (2) keep guard against the machinery oil leakage and the dumping into the water, reinforce environmental management, Hanbing District pollution In launch instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of Contractor Traffic construction the water. Department stage (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water. Hanbing District In ( I ) for the rest of the inhabitants atnight, machinery with big noise should be stopped working from 22:00 P.M to 6:00 . construction AM Traffic noises sta A.M. Contractor stage (2) machinery and the mixer used fixedly should be kept at sites 150m away from the residential areas. Department Envimmnt Shaaxi In.design Provincial In Necessary passages are made in full consideration of the passers' safety during the rebuilding periods as.enunit stannit Highway Bureau In On-job posts are put up for the traffic safety of the pedestrians at the construction section. To reduce the probability of Hanbing District are contractor Traffic Social construction accidents, effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages Department economy stage cleared away in time. Hanbing District Envrionment Hanbig Distrct In operation It is necessary to put forth measures against the hazardous goods transportation and the Hanbing environmental Traffic stage protection departments concerned are to set up emergency team to take swift actions against it Protection Department Department In operation The falling rocks from the side slope should be done with in time to avoid accidents Maintenance Hanbing District . Traffic Traffic safety Department stage . section In The earths from the foundation excavation should be done with in time when in construction, no dumping of them into Hanbing District Solid waste construction rivers or thrown away at the beach. After completion,the consruction wastes, old devices, packages and rubbishes are to Department pollution stage be collectively sealed up and carried away outside in time. Hanbing District In Dust protection of the surrounding road sections should be well made, water should be sprayed at the materials stocks, contractor Traffic Dust pollution construct-ion the sites of construction materials carriage and the construction sites regularly to avoid dust pollution. stage . Department 66 Table 5-2 The 2006 yearly Xi'an-Ankang rural highway project program loaned by World Bank Building scale . Link-town number after Adrminstrative grade Building feature Before building After buiding Link-vilage mnuber aftcr building (kin) a buiding No.. Subgrade Pa-vemnent Pavement nubr twubrVillage .. EL~ ~ ~ ~ ~ ~ ~~~ tyenm < - Width(m) Widdi(m) 3 Han Shtuangzh *TO be 12 45 Gae6. . iwc 865 2 Hnsi i4 w 617 1425 1872 bing engri. ch~ang-ei 2 45Gae . . iue 40. oghn4Jnjec 9 Hang YinRd rewbuid 15 None 4.5 3.5 Gravel 4457.6 1 Xinba- 3Xingba Etc. 4474 517 2682 bmg babeluRcL To e Waa-wa I 1-lan Qix,ncu clTonbe 1 2.9 None 4.5 3.5 Gravel 1030.7 1 Wulizheng 3 Wn-vn37 5 6 10 bing Rd.cagedIIEc 11 Wang=anz To be 12 2.9 None 4.5 3.5 Gravel 1262.6 1 Wuizih= 2 Wang-canz 3461 788 1171 iRd. ciang-ed 13 Han Shuagpin Tobe 13 2.9 None 4.5 3.5 Gr-avel 1095.0 1 Wulhiheng 1 Shuan-pingetc. 820 140 385 bing gmcunL chang-ed 15 Han Yun,gin,g To be None Datong- 1Yugqn2216613 15 curl bing ~~~~~chang-ed 7 2.9 4.5 3.5 Gravel 892.5 1 lnIYugig2116613 20 bin ZhuWn To bged 14 2.9 None 4.5 3.5 Gravel 1852.2 1 Hongshantc.1791 627 1118 id Icang IAiIg tc 28 h Hcxffan Tobe 20 3o NnH, , Gae 9321 fongsha- 4Q*ng1i 2737 643 1067 bing geni * 0 . Nn 4535Gr-od93. ziieg Etc. Lan To be 14 4 Gai 6 5 Btmn 2130MihWU, ii 30 anaRd 4D doge .5 rae 6.5 5. iue 9630 3 C.m 1 Etcl. 32805 18780 27654 33 ,biuan * Tbei 35 4.5 None 6.5 5.5 Bitumen 23341.6 2 Guma tc.I 8480 3915 7986 37 Lan YuheHcng TO be . '13Nw4. rve 0. Shimen- 3Yuiexn 2196 1345 1864 PO Rd. I eliag-ed I .. zin AM. Etc. 46 Lan Xiiihu * Tobe 5 3 None 4.5 3.5 Gr-avel 440.0 1 Minzhu 1 mi 2428 814 1998 gaO Rd. chng-ed v_____'illiage ____ _ ___ 47 Ln Tuanyna TOb 6 3 Nc 4.5 3,5 Gravel 540 1 Yanmen 3 Ya'n1070 644 796 ga0 Rd. chan -ed _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _E tc. _ _ _ _ _ _ __ _ _ _ 67 1Administratie To be continued Table 5-2 The 2006 yerly Xi'an-Ankang rural highway project program loaned by World Bank ____ grade Feature Scale Before buiding After building z Link-tow-n after building Linik-village after building (kan) No. Item 8 .Ne 50 zi Tong-Shuang * Tob chang-ed 39.00 4.5 Gravel 6.5 5.5 bitumen 21544.0 3 Tongh, Miaohe 10 Qimwn10315 5982 8958 ATlcag-d yaEaR E_g Etc.__ _ _ _itc. 51Zi Gao-han * Tobe chang-ed 31,15 4 nravel 4.5 3.5 biturnen 33476.1 2 Yuang-Cyang- 3i6ng1345 37738 15671 Yang Rd. Etcuct.C. 60 l3iiie To be chang-ed 17,00 4.2 nranel 4.5 3.5 bitmuni 435111. 2 gaoiao, 16 Buarth 81722 15311 26854 l ing-xiaongc Etc. yang Rd. _ _ _ _ _ _ _ _ ___ _ _ _ _ _ _ _ s__ 64 zl Miaowa * Tobe chang-ed 15.00 45 none 453 3.5 Gravel 3153.2 1 Maoba'e Wata-Fn 10419 61012 85667 1yang Rd. Tmio-Zng vlaEtc.___ 659 van Rd.i * Tobe chang-ed 5,01 34 none 4.5 3,5 Gitavel 3117.4 1 2onmgCheng 1 SEt94 613017 56718 67 r0cmn To bechang-ed 17.0 4.2 now 4.5 3.5 Graveln 5123.2 1 6gin inn19 8172531 15482 82 Zi Linf Tobe chang-ed 5.00 4 none 4.5 3.5 Gravel 381.0 1 Taqio-hw 1 Liain-Fe 21839 6122 1266 Yang Rd. ___ Town__ 65 i Watjia * Tobechang-ed 5.0 3.8 norie 4.5 3.5 Gravel 312.4 1 M.aobazi 1 vhijiag 940_601_61 Yang Rd.. __ _ _gng__ _ __ __ _ _ ___ __ _ _ _ _ __ __ 98 zi 'rNaz-han * Noeewh 4,20 45 no 4.5 3.5 Gravel 4163.0 1 Changi-guhon 1 Na4iu-d 1320 910 1119 yang Rd. v"i1a _ _ _ _ _ _ n_ 103 *i;uh Tobechang-ed 3.0 3. nowe 4.5 3.5 Gravel 211.4 1 Lwian-h-xang 1 Q-sha18 122832 8261 yang ~~Rd. _ _ _ _ _ _ _ _-_ 105 on Rd.-'a * hagsd Newe ,0 3 nome 4.5 3.5 Gravel 555.1 1 Macba-zbeng 1 vmiga 15018 9128 1273 yang Rd. _ _ _ _ built _ _ _ _ _ _ _ _ _ _ _ _ _ 108 * Tobe chng-ed 11.5 4.2 nowt 4.5 3.5 Gravel 709.9 1 2incdn ysan 5039 3528 4567 yang Rd.Li I I I vinow~~~~6 EIA and EP Execution Frame ofLRIP 5 Framework of Execution Programof Environment Protection Table 5-3 (Hanbing District) Enviromental Protection Action Program of Shuanzheng Highway Project introduction: it start at Shuangjiaba and stops at Zhengyi village, the whole route is to be changed with its mileage 12km. after its completion, the width of the road base is 6.5m,thatof the surface is 5.5m. The cubic meter of rocks of the prject at the road base is 2.65 ten thousand m It is of county road. 3 . engineering features: the route goes through a strip of hill land going upwards, it is an item to be changed, after the change, the road surface is of bitumen one without bridge project. Environment feature: it is mostly covered with vegetations along the route. Thedchfeoing The environmental protection measures to be adopted and its implementation stage ImplinrJn limuon indar envncrni insiulItion issue ( I ) adopt kinds of techniques to keep slopes stable and avoid land erosion Envin SaPot In design (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. a uit Shaaxi Provincial stage 8 unit Highway Bureau ( I ) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) in consultation with the local management departments to make good plans of the land acquisition and dumping sites. In the process of construction, balance the removal and dump possibly, pile the dumping earthwork in fixed place and protect the sites in time and necessarily so as to avoid huge water and land erosion. (3 ) for the route along rivers, build ward-off projects to keep earthwork and cubic meters of rocks from dropping into Ecological In the rivers along the route, and after the completion of the construction, seeds of the local vegetation are sown along the Hanbing District environment construction side slopes and the river banks. For the surplus cubic meters of rocks in construction can be filled in the ditches and contractor Traffic issue t trenches along the route and then covered with soil to restore farming. Department stage (4) strictly control the log numbers to be cut down, forbid to get rocks, gravels and earths in the woods. (5) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating in depth. (6) lands occupied by the makeshift projects should be cleared in time and handed over the local authorities for farming restoration after completion. In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is Main- Hanbing District stage carried out to each specific section and appoint fixed staff to take charge. tenance section Traffic Department water In design Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by En it Shaaxi Provincial pollution stage the brushing off of the side slope. Desinuit Highway Bureau 69 EL-I and EP Execution Frame ofLRIP 5 Frameworkof Execution Program of Environment Protection (I ) the domestic sewage pollution and rubbish in the management quarters are collectively disposed of without direct drainage into the water. In (2 ) keep guard against the machinery oil leakage and the dumping into the water, reinforce environmental regularly to Hanbing District construction management, launch instruction campaign. Repair the vehicles, transports and boats in construction stage prevent pollution ofthe water. (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they Department should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water. (I ) for the rest of the inhabitants at night, machinery with big noise should be Hanbing District Nois issue constructIn stopped working from 22:00 PM to 6:00 A.M. quarters of the contractor Traffic Noise issue construction (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living Department stage inhabitants. Swl n ighway H Bureau In design Necessary passages are made in full consideration of the passers' safety during the rebuilding periods Hanbing District In On-job posts are put up for the traffic safety of the pedestrians at the construction section. To reduce the probability of pilings in the passages contractor Traffic Social construction accidents, effective safety and warning measures are taken in doing explosive work. The earth Department economy stage are cleared away in time. It is necessary to issue measures against the transportation accidents of dangerous items, and set up a team to meet an Hanbing District Hanbing District In operation emergency by the concerning departments of Hanbing District Environment Protection so as to take immediate actiorn. Envrionment Traffic Protection Department stage Department The falling rocks from the side slope should be done with in time to avoid accidents X Hanbing District Main-Trfi Traffic In operation tenance section Department safety stage no dumping of them into Hanbing District Solid waste In The earths from the foundation excavation should be done with in time when in construction, Solid waste and rubbishes are to contractor Traffic pollution construction rivers or thrown away at the beach. After completion,the consruction wastes, old devices, packages Department stage be collectively sealed up and carried away outside in time. Hanbing District In Dust protection of the surrounding road sections should be well made, water should be sprayed at the materials stocks, contractor Traffic Dust construction the sites of construction materials carriage and the construction sites regularly to avoid dust pollution. Department pollution stage 70 EIA and EP Execution Frame ofLRlP 5 Framework of Execution Programof Environment Protection Table 5-4 (Hanbing District) Enviromental Protection Action Program of New Tielu Highway Project introduction: it starts from the people's government of Xinbaxiang and stops at the Hongxing village of Tielu town, it is an item to be changed with its mileage l5km. the cubic meters of rocks ofthe road base are 5.67 ten thousand m3. It is of a village road. Engineering feature: the route goes through areas ofhuge mountain ranges, an item to be changed, after the change, the road surface is of that paved with gravels. Thediefeing environmental protection measures to be adopted and its implementation stage lnl 1ruittimindaige effrlvmr ____ mntissue (I ) adopt kinds of techniques to keep slopes stable and avoid land erosion Shaaxi In design (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. EnvEnvit Provincial stage aa unit Highway DesgiUulit Bureau (1 ) reasonably arrange construction sequence, sectional construction and choice ofadvanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) in consultation with the local management departments to make good plans of the land acquisition and dumping sites. In the process of construction, balance the removal and dump possibly, pile the dumping earthwork in fixed place and protect the sites in time and necessarily so as to avoid huge water and land erosion. Ecological (3 ) for the route along rivers, build ward-off projects to keep earthwork and cubic meters of rocks from dropping into environment In constructio the rivers along the route, and after the completion of the construction, seeds of the local vegetation are sown along Hanbing District issues stage the side slopes and the river banks. For the surplus cubic meters of rocks in construction can be filled in the ditches contractor Traffic and trenches along the route and then covered with soil to restore farming. Department (4) strictly control the log numbers to be cut down, forbid to get rocks, gravels and earths in the woods. ( 5) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating in depth. (6) lands occupied by the makeshift projects should be cleared in time and handed over the local authorities for farming restoration after completion. In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is Main- Hanbing District stage carried out to each specific section and appoint fixed staff to take charge. tenance section Traffic I______________ Department Water In design Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by pollution stage the brushing off of the side slope. 71 EIA and EP Execution Frame of LRlP 5 Framework of Execution Programof Environment Protection (I ) the living water pollution and rubbish in the management quarters are collectively disposed of without direct drainage into the water. ( 2 ) keep guard against the machinery oil leakage and the dumping into the water, reinforce environmental In construction management, launch instruction campaign. Repair the vehicles, transports and boats in construction regularly to stage prevent pollution ofthe water. (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the i________________ water. l constru.tii ( I) for the rest of the inhabitants at night, machinery with big noise should be stopped working from 22:00 RM to iNoiseissue In construcisos 6:00 A.M. stage (2) machinery and the mixer used fixedly should be kept at stes 150m away from the residential areas. In design Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up stage necessary passage ways and to replace those with that in water In constructlor On-job posts are put up for the traffic safety of the pedestrians at the construction section. To reduce the probability of Social stage accidents, effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages economy are cleared away in time. In operation It is necessary to issue measures against the transportation accidents of dangerous items, and stage Set up a team to meet an emergency by the concerning departments of Hanbing District Environment Protection so as to take immediate actions. Traffic In operation The falling rocks from the side slope should be done with in time to avoid accidents from happening. safety stage The earths from the foundation excavation should be done with in time when in construction, no dumping ofthem into Solid waste In constructio pollution stage rivers or thrown away at the beach. After completion,the consruction wastes, old devices, packages and rubbishes are to pollution stage be collectively sealed up and carried away outside in time. Dust In constructio Dust protection ofthe surrounding road sections should be well made, water should be sprayed at the materials stocks, pollution stage the sites of construction materials carriage and theconstruction sites regularly to avoid dust pollution. .. 72 EIA and EP Execution Framiie of LRPP 5 Framework ofExecution Program ofEnvironment Protection Table 5-5 (Hanbing District) Environment protection action plan program of Qixing village highway Project introduction: it starts from the Liwan village of Wuli town and stops at the Qixin village, the road is to be changed, with a mileage of 1Okm. after its completion, the width of the road base is 4.5m with gravel-paved road surface. 3 The cubic meters ofrocks ofthe project base are 1.65 mn (in ten thousand). It is a village road. Engineering feature: the route goes through the area of huge mountainous range. It is an item to be changed, with 2 bridges of 32 meters length each. kTionu The chief caMig in]tion lnsitutioin dnpg .erchIe.iss The environmental protection measures to be adopted and its execution stage ( I) adopt kinds of techniques to keep slopes stable and avoid land erosion Envi SPHB In design (2 ) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. mentuni stage (3) forbid quarry and land removal in the woods. eunit (I ) reasonably arrange construction sequence, sectional construction and choice ofadvanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) in consultation with the local management departments to make good plans of the land acquisition and dumping sites. In the process of construction, balance the removal and dump possibly, pile the dumping earthwork in fixed place Ecological and protect the sites in time and necessarily so as to avoid huge water and land erosion. environment In (3) for the route along rivers, build ward-off projects to keep earthwork and cubic meters ofrocksfrom dropping into Hanbing District issue construction the rivers along the route, and after the completion of the construction, seeds of the local vegetation are sown along contractor stage the side slopes and the river banks. For the surplus cubic meters of rocks in construction can be filled in the ditches Traffic Department and trenches along the route and then covered with soil to restore farming. (4) strictly control the log numbers to be cut down, forbid to get rocks, gravels and earths in the woods. (5 ) give instructions to the construction staffto protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating in depth Hanbing District In operation The highway maintenance units should take up the task ofecology protection ofthe highways along the route, which is Main- Traffic Department stage carried out to each specific section and appoint fixed staff to take charge. tenance section Envfirt- nitas- Shaaxi Provincial water pollution In design Protection in design ofthe road sections along the riverside is well made so as to avoid impacts on the water quality by Highway Bureau stage the brushing off of the side slope. mrtunit 3unit 73 EJA and EP Execution Frame of LRIP 5 Frameworkof ExecutionProgramof Environment Protection ( I ) the domestic sewage pollution and rubbish in the management quarters are collectively disposed of without direct drainage into the water. In (2) keep guard against the machinery oil leakage and the dumping into the water, reinforce environmental construction management, launch instruction campaign. Repair the vehicles, transports and boats in construction regularly to Hanbing District stage prevent pollution ofthe water. contractor Traffic Department (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water. In ( I ) for the rest of the inhabitants at night, machinery with big noise should be .. Noise issue construction stopped working from 22:00 P.M. to 6:00 A.M. contractor Hanbing District stage (2) machinery and the mixer used fixedly should be kept at sites 150m away from theresidential areas. Traffic Department To be continued Table5-5 (Hanbing District) Environment protection action plan program of Qixing village highway TlHdiiefedsing The environmental protection measures to be adopted and its execution stage Inplr on ri uuonindarge enfsn- institigion Envirn In design Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up mntas Shaaxi Provincial stage necessary passage ways and replace it with those in water mnatunit Highway Bureau Desigiunkt In On-job posts are put up for the traffic safety of the pedestrians at the construction section. To reduce the probability of Social construction accidents, effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages contractor Hanbing District economy stage are cleared away in time. In operation It is necessary to issue measures against the transportation accidents of dangerous items, and set up a team to meet an Hanbing stage In emergency by the concerning departments ofHanbing District Environment Protection so as to take immediate actions. District Hanbing District operation Protection Traffic Department stage Department Tralfic In operation The falling rocks from the side slope should be done with in time to avoid accidents. Main- i ~~~~~Traffic In operation tnceHanbing District lsafety stage tenance Traffic Department section- The earths from the foundation excavation should be done with in time when in construction, no dumping of them into lSolid waste In rivers or thrown away at the beach. After completion,the consruction wastes, old devices, packages and rubbishes are construction to be collectively sealed up and carried away outside in time. Especially, after bridge construction completion, clear contractor Hanbig Distrct pollution Traffic Department stage away the pilings and level off in time so as to let the vegetation on the river bank to restore as naturally and quickly as possible. 74 ElIA and EP Execution Frame of LRIP 5 Framework ofExecution Programof Environment Protection Dust protection ofthe surrounding road sections should be well made, water should be sprayed at the materials stocks, Dlustio Incstruction the sites of construction materials carriage and the construction contractor Traffic Department pollution stage sites regularly to avoid dust pollution. Table 5-6 (Hanbing District) Environment protection action plan program of Wangcanzi village highway Project introduction: it starts from the Mogou village ofWuli town and ends at the Wangcanzicun village. It is an item to be 3 changed with a mileage of 12 km long, the cubic meters of rocks ofthe project base are 2.16 nm (in ten thousand) it is a vallage road, Engineering feature: the route goes through the area of huge mountainous range and goes along side by side with the river It is an iten to be changed with 3 bridges of48 meters in length each. Thecdiefecsting environmental protection measures to be adopted and its implementation stage IlrrIe ion Iitinfitinidar envnaxff= inftjihi is,ue (I ) adopt kinds of techniques to keep slopes stable and avoid land erosion Envioi- In design (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. nmesta- Shaaxi Provincial stage mentunit Highway Bureau Dunetsign (I ) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) in consultation with the local management departments to make good plans of the land acquisition and dumping sites. In the process of construction, balance the removal and dump possibly, pile the dumping earthwork in fixed place and protect the sites in time and necessarily so as to avoid huge water and land erosion. (3 ) for the route along rivers, build ward-off projects to keep earthwork and cubic meters ofrocks from dropping into Ecological In the rivers along the route, and after the completion of the construction, seeds of the local vegetation are sown along environment construction the side slopes and the river banks. For the surplus cubic meters of rocks in construction can be filled in the ditches contractor Hanbing District issue stage and trenches along the route and then covered with soil to restore farming. Traffic Department (4) strictly control the log numbers to be cut down, forbid to get rocks, gravel and earths in the woods. (5) give instructions to the construction staffto protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating in depth. In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is Main- stage carried out to each specific section and appoint fixed staff to take charge. tenance Traffic Department stage7section5Traffic Department 75 EIA and EP Execution Frame of LRIP 5 FrameworkofExecution Program ofEnvironment Protection Protection in design ofthe road sections along the riverside is well made so as to avoid impacts on the water quality by Enviiu,- n tasss- Shaaxi Provincial In design the brushing off of the side slope. ntiaunit Highway Bureau stage De3gnuni (I ) the living water pollution and rubbish in the management quarters are collectively disposed of without direct Water drainage into the water. pollution In ( 2 ) keep guard against the machinery oil leakage and the dumping into the water, reinforce environmental regularly to contractor Hanbing District construction management, launch instruction campaign. Repair the vehicles, transports and boats in construction Traffic Department stage prevent pollution ofthe water. (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water. In ( I) for the rest of the inhabitants at night, machinery with big noise should be stopped working from 22:00 P.M to _ contractor Hanbing District Noise construction 6:00 A.M. areas. stage (2) machinery and the mixer used fixedly should be kept at sites 150m away from theresidential Envirem mentas Shaaxi Provincial In design Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up nmetunit Highway Bureau stage necessary passage ways and replace them with those in water _ Desgiuunt In On-job posts are put up for the traffic safety of the pedestrians at theconstruction section. To reduce the probability of in the passages contractor Traffic Department Social construction accidents, effective safety and warning measures are taken in doing explosive work. The earth pilings economy stage are cleared away in time. It is necessary to issue measures against the transportation accidents of dangerous items, and set up a team to meet an Hanbing District Hanbing District In operation emergency by the concerning departments of Hanbing District Environment Protection so as to take immediate actions. Envrionment HnigDsrc Protection Traffic Department stage Department Main- Hanbing District Traffic In operation The falling rocks from the side slope should be done vith in time to avoid accidents from happening. tenance Traffic Department safety stage The earths from the foundation excavation should be done with in time when in Solid waste In construction, no dumping of them into rivers or thrown away at the beach. After completion, away outside contractor Hanbing Distrnct Sold waste construction the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up and carried stage in time. Especially, after bridge construction completion, clear away the pilings and level off in time so as to let the vegetation on the river bank to restore as naturally and quickly as possible. Hanbing District Dust In construction Dust protection of the surrounding road sections should be well made, water should be sprayed at the materials stocks, contractor Hanbin Distrt pollution stage the sites of construction materials carriage and the construction sites regularly to avoid dust pollution. 76 EIA and EP Execution Frame ofLRJP 5 Framewolrk ofExecution Programof Environment Protection Table 5-7 (Hanbing District) Environment protection action plan program ofShuangping village highway Project introduction: it starts at the Liwan village ofWuli town and ends at Shuangping village, it is an item to be changed with a mileage of 13 km. the cubic meters of rocks of the project road base is 2.34 m3 ( in ten thousand). It ia a village road. Project feature: the route goes through the area of huge mountainous ranges. It is an item to be changed, with mostly lines going on upper slopes A few are those of mountainous lines. Bridges there are 2 of 32 m long each. Engineering feature: the road at Shuangping village is based on the old one with the road base a bit wider, no large filling and excavation, no large volume of waste earthworks and rocks do damage to the vegetation along the route. Thedliefe'dsing The environmental protection measures to be adopted and its emplementation stage lnpleic crlion incdarge is=e (I ) adopt kinds of techniques to keep slopes stable and avoid land erosion Fnvni- Shaaxi In design (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. mentas- Provincial stage nitunk Highway Bureau (I ) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) strictly control the log numbers to be cut down, forbid to get rocks, gravels and earths in the woods. Ecological In (3) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to Hanbing environment construction vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the trctor District issue stage section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high Traffic and excavating in depth. Department (4) In the process of construction, balance the removal and dump possibly, pile the dumping earthwork in fixed place and protect the sites in time and necessarily so as to avoid huge water and land erosion. The highway maintenance units should take up the task of ecology protection of the highways along the route, which is carried Main- Hanbing In operation out to each specific section and appoint fixed staff to take charge. tenance District stage section Traffic Department Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by the Envihu- Shaaxi Water In design brushing off ofthe side slope. nats- Provincial pollution stage mntunit Highway Designunut Bureau 77 EIA and EP Execution Frame of LRIP 5 Framework ofExecution ProgramofEnvironment Protection (1) the living water pollution and rubbish in the management quarters are collectively disposed of without direct drainage into the water. Hanbing In (2) keep guard against the machinery oil leakage and the dumpirg into the water, reinforce environmental management, launch District construction contractor Trfc constructioninstruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of the water: Traffc stage (3) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should Department be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water ( I ) for the rest ofthe inhabitants at night, machinery with big noise should be Hanbing Noise issue construction stopped working from 22:00 P.M.to 6:00 A.M. contractor District stage (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters of the inhabitants. Traffic stage ~~~~~~~~~~~~~~~~~ Envri- Shaaxi In design Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up necessary mentas- Provincial stage passage ways. mneturnit Highway Designurit Bureau In On-job posts are put up for the traffic safety of the pedestrians at the construction section. To reduce the probability of accidents, Hanbing . ontrcion effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages are cleared away in District Social construction me.contractor Traffic economy Department It is necessary to issue measures against the transportation accidents of dangerous items, and set up a team to meet an Hanbing emergency by the concerning departments of Hanbing District Environment Protection so as to take immediate actions. District Hanbing In operation Envrionme District stage nt Traffic Protection Department Department The falling rocks from the side slope should be done with in time to avoid accidents from happening. Main- Hanbing Traffic In operation District safety stage tenance Traffic Department The earths from the foundation excavation should be done with in time when in Hanbing Solid.waste In construction construction, no dumping of them into rivers or thrown away at the beach. After completion, Ding polluwasti stage the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up and carried away outside in time. contractor Traffic Especially, after bridge construction completion, clear away the pilings and level off in time so as to let the vegetation on the Department river bank to restore as naturally and quickly as possible. Dust protection of the surrounding road sections should be well made, water should be sprayed at the materials stocks, the sites Hanbing Dust In construct of construction materials carriage and the construction District contractor pollution stage sites regularly to avoid dust pollution. Traffic Department 78 Environment Protection. EJA and EP Execution Frame ofLRIP 5 Framework ofExecution Programof Table 5-8 (Hanbing District) Environment protection action plan program ofYungqing village highway Project introduction: it starts from the Guangrong village ofDatong town and ends atYungqingcun village. It is an item to be changed, whose whole mileage is19 km. the cubic meters of rocks at road base of the project is 1.26m3 inten thousand. Engineering feature: the route goes through the area of huge mountainous range. It is an item to be changed, which mostly Goes along str ams, only a few go on upper slopes. Bridges are 2 of 47 meters long each. Irrple in Inhtonincdar The diefodsing The environmental protection measures to be adopted and its explementation stage binsion envruew (I ) adopt kinds of techniques to keep slopes stable and avoid land erosion Enviati- rnrta Shaaxi Provincial In design (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. mntunit Highway Bureau stage De_D urit (I ) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) in consultation with the local management departments to make good plans of the land acquisition and dumping sites. In the process of construction, balance the removal and dump possibly, pile the dumping earthwork infixed place and protect the sites in time and necessarily so as to avoid huge water and land erosion. Ecological (3 ) for the route along rivers, build ward-off projects to keep earthwork and cubic meters of rocks from dropping into the rivers the side slopes and contractor Hanbing District environment In along the route, and after the completion of the construction, seeds of the local vegetation are sown along along the route Traffic Department issues srut n the river banks. For the surplus cubic meters of rocks in construction can be filled in the ditches and trenches stage and then covered with soil to restore farming. (4) strictly control the log numbers to be cut down, forbid to get rocks, gravels and earths inthe woods. (5) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating in depth. Main- Hanbing District Inoperation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is carried tenance Hanbin Distrt sntoperto out to each specific section and appoint fixed staff to take charge. section Traffic Department stage Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by the Fnvui-i- mentas- Shaaxi Provincial water In design brushing off of the side slope. nmetunit Highway Bureau pollution stage 79uni 79 EIA and EP Execution Frame of LRIP u Framework of Execution Programof Envlronn2ent Protection ( I ) the living water pollution and rubbish in the management quarters are collectively disposed of without direct drainage into In the water. construction (2) keep guard against the machinery oil leakage and the dumpirg into the water, reinforce environmental management, launch Hanbing District stage instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of the water Traffic Department (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water In ( I) for the rest of the inhabitants at night, machinery with big noise should be Hanbing District Noise issue construction stopped working from 22:00 P.M. at night to 6:00 A.M. the next morning. contractor Traffic Department stage (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters of the inhabitants. EnvituF In design Take into full consideration ofthe impacts of the road to be changed upon safe passage in the duration and build up necessary nrtass- Shaaxi Provincial stage passage ways. mntunit Highway Bureau Deignunit On-job posts are put up for the traffic safety ofthe pedestrians at the construction section. To reduce the probability of accidents, Social stage effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages are cleared away in contractor Traffic Department _____________ time. economy It is necessary to issue measures against the transportation accidents of dangerous items, and Hanbing Set up a team to meet an emergency by the conceming departments of Hanbing District District In operation Environment Protection so as to take immediate actions. Envrionme Hanbing District stage nt Traffic Department Protection Department Trai IThe falling rocks from the side slope should be done with in time to avoid accidents. Main- Traffic In operation Hanhing District safety stage tenance Traffic Department section The earths from the foundation excavation should be done with in time when in In construction, no dumping of them into rivers or thrown away at the beach. After completion, Hanbing District Solid waste construction the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up and carried away outside in time. contractor Traffic Department pollution stage Especially, after bridge construction completion, clear away the pilings and level off in time so as to let the vegetation on the river bank to restore as naturally and quickly as possible. ._. Dust In construction Dust protection of the surrounding road sections should be well made, water should be sprayed at the materials stocks, the sites Hanbing District pollution stage of construction materials carriage and the construction contractor TafcDprmn polustion sites regularly to avoid dust pollution. Traffic Department 80 EIA and EP Execution Frame ofLRIP 5 Framework ofExecution Programof Environment Protection Table 5-9 (Hanbing District) Environment protection action plan program ofZhouwan village highway Project introduction: it starts atK5+900 ofthe Shuangzheng road and ends at K42+000Of Kuqian road. It is an item to be changed, whose mileage is 14 km. the cubic meters of earthworks and rocks at the road base ofthe project is 3.44m3. it is a village road.tin. Engineering feafure: the route goes through the area of huge mountainous ranges , an item to be changed, bridges are 4 of80 M long each. stage Impl lInitutionin duge Thediiefe'dimng The environmental protection measures to be adopted and its execution insuk1tion envrknmn issu_ (I ) adopt kinds of techniques to keep slopes stable and avoid land erosion EnviRn mr,nta Shaaxi Provincial In design (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. mntunit Highway Bureau stage Designunit (I ) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) in consultation with the local management departments to make good plans of the land acquisition and dumping sites. In the process of construction, balance the removal and dump possibly, pile the dumping earthwork in fixed place and protect the sites in time and necessarily so as to avoid huge water and land erosion. (3 ) for the route along rivers, buildward-off projects to keep earthwork and cubic meters of rocks from dropping into the rivers Ecological along the route, and after the completion of the construction, seeds of the local vegetation are sown along the side slopes and along the route contractor Hanbing District environment In construction the river banks. For the surplus cubic meters of rocks in construction can be filled in the ditches and trenches Traffic Department issues stage and then covered with soil to restore farming. (4) strictly control the log numbers to be cut down, forbid to get rocks, gravels and earths in the woods. (5) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating in depth. (6) lands occupied by the makeshift projects should be cleared in time and handed over the local authorities for farming restoration after completion. Main- Hanbing District In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is carried tenance Traffic Department n stage out to each specific section and appoint fixed staff to take charge. 81 EIA andEP Exectition Frame of LRIP 5 Frameworkof Execution Programof Environment Protection To be continued Table 5-9 (Hanbing District) Environment protection action plan program ofZhouwan village highway IoTla in hitnicnin dage Thediiefexising The environmental protection measures to be adopted and its execution stage mntiution envrioxnrnn Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by the Envirm- Shaaxi Provincial In design brushing off of the side slope. mer,ta Highway Bureau stage mntunit Design unk Water (I ) the domestic sewage pollution and rubbish in the management quarters are collectively disposed of without direct drainage pollution into the water. (2) keep guard against the machinery oil leakage and the dumping into the water, reinforce environmental management, launch Hanbing District construction instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of the water Traffic Department stage (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water Hanbing District In (I ) for the rest of the inhabitants at night, machinery with big noise should be contractor Hanbin Distrt Noise issue construction stopped working from 22:00 P.M. at night to 6:00 A.M. the next morning. Traffic Department stage (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters of the inhabitants. Ei Shaaxi Provincial In design Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up necessary mnta- Highway Bureau stage passage ways and replace them with those in water. nmunit Desim unkt accidents, Social In On-job posts are put up for the traffic safety ofthe pedestrians at the construction section. To reduce the probability of cleared away in contractor Traffic Department economy construction effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages are stage time. Hanbing District In operation It is necessary to issue measures against the transportation accidents of dangerous items, and Hanbing Traffic Department stage Set up a team to meet an emergency by the concerning departments of Hanbing District District Environment Protection so as to take immediate actions. EPB Main- Trai IThe falling rocks from the side slope should be done with in time to avoid accidents from happening. tnce Hanbing District Traffic In operation tenance Traffic Department safety stage In The earths from the foundation excavation should be done with in time when in Solid waste construction construction, no dumping ofthem into rivers or thrown away at the beach. After completion, contractor Hanbing Distrnct pohdlwastion cstruction the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up and carried away outside in time. on the Traffic Department pollution stage Especially, after bridge construction completion, clear away the pilings and level off in time so as to let the vegetation river bank to restore as naturally and quickly as possible. Dust In constructioi Dust protection of the surrounding road sections should be well made, water should be sprayed at the materials stocks, the sites contractor Traffic Department pollution stage of construction materials carriage and the construction sites regilarly to avoid dust pollution. 82 EIA and EP Execution Frame ofLRIP 5 Framework ofExecution Program ofEnvironment Protection Table 5-10 (Hanbing District) Environment protection action plan program of Hongying highway Project introduction: it starts at K25+500 of Kuqian road and ends at K36+ 100 of Kuqian road, an item to be changed, whose mileage is 20 km. the cubic meters of earthworks and rocks at road base ofthe prject are 3.6m3 I ten thousand, a village road. Engineering feature: the rout goes through the area ofhuge mountainous ranges, an item to be changed, which mostly goes along Streams, a few go on slopes. Bridges are 2 and 46 m long each. Thecidefexsling The environmental protection measures to be adopted and its explementation stage lmpetir.n hstituionincharge eMwirnm indihtil (I) adopt kinds of techniques to keep slopes stable and avoid land erosion Envimn- In design (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. nnata- Shaaxi Provincial stage nitunit Highway Bureau Designunit (I) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. contractor Hanbing District (2) in consultation with the local management departments to make good plans of the land acquisition and dumping sites. In Traffic Department the process of construction, balance the removal and dump possibly, pile the dumping earthwork in fixed place and protect the sites in time and necessarily so as to avoid huge water and land erosion. Ecological In (3 ) for the route along rivers, build ward-off projects to keep earthwork and cubic meters ofrocks from dropping into the rivers environment construction along the route, and after the completion of the construction, seeds of the local vegetation are sown along the side slopes and issuese stage the river banks. For the surplus cubic meters of rocks in construction can be filled in the ditches and trenches along the route stage and then covered with soil to restore farming. contractor (4) strictly control the log numbers to be cut down, forbid to get rocks, gravels and earths in the woods. Traffic Department (5) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating in depth. In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is carried Main- Hanbing District stage out to each specific section and appoint fixed staff to take charge. tenance stage section Traffic Department Protection in design of the road sections along the stream side is well made so as to avoid impacts on the water quality by the Enviirn- water In design brushing off of the side slope. meitas- Shaaxi Provincial pollution stage mentunit Highway Bureau Designuriit 83 EIA and EP Execution Frame of LRIP 5 Framework ofExecution ProgramofEnvironment Protection (I ) because the highway is built along the river, the living water pollution and rubbish in the management quarters are In collectively disposed of without direct drainage into the water. launch Hanbing District construction (2) keep guard against the machinery oil leakage and the dumpirg into the water, reinforce environmental management, Traffic Department stage instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of the water (3) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water In (I ) for the rest of the inhabitants at night, machinery with big noise should be Hanbing District construction stopped working from 22:00 P.M. at night to 6:00 A.M. the next morning. contractor Traffic Department Noise issue stage (2) machinery and the mixer used fixedly should be kept at sites 150m away from theresidential areas. E[__ mentam- Shaaxi Provincial In design Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up necessary mnitun,t Highway Bureau stage passage ways and replace them with those in water. eunsg urit In construction On-job posts are put up for the traffic safety of the pedestriansat the construction section. To reduce the probability of accidents, away in contractor Traffic Department Social s ctage effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages are cleared time. _ _ _ _ _ _ Hanbing economy It is necessary to issue measures against the transportation accidents of dangerous items, and District Set up a team to meet an emergency by the concerning departments ofHanbing District Envrionme Hanbing District In operation Environment Protection so as to take immediate actions. nt Traffic Department stage Protection Department Hanbing District Traffic In operation The falling rocks from the side slope should be done with in time to avoid accidents from happening. Main- ~~~~~~~~~~~~~~~~~~~~~~~~~~~ HnigDsrc Traffic In operation section Traffic Department safety stage The earths from the foundation excavation should be done with in time when in Solid waste In construction construction, no dumping of them into rivers or thrown away at the beach. After completion, and carried away outside in time. contractor Traffic Department pollution stage the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up Especially, after bridge construction completion, clear away the pilings and level off in time so as to let the vegetation on the river bank to restore as naturally and quickly as possible. In Dust protection of the surrounding road sections should be well made, water should be sprayed at the materials stocks, the sites Hanbing District Dust construction of construction materials carriage and the construction Traffic Department pollution stage sites regularly to avoid dust pollution. 84 EIA and EP Execution Frame of LRPP 5 FrameworkofExecution ProgramofEnvironment Protection Table 5-11 (Langao County) Environment protection action plan program of Landa highway Project introduction: it starts at Shiliangzi and ends at the joint where the high speed highways of Dadaohea and Dadaohebei meet, whose whole length is 44km, ofwhich 41 km is to be changed, and 3km. is newly built.The cubic meters Of earthworks and rocks at road base of the project is 25m3 in ten thousand. The Beizhiya tunnel is 680m long. A county road. Engineering feature: the route goes through the area of huge mountainous ranges, and along the valleys of the Siji river the Pingxi river, the Xiaozheng river, the Dadao he river, the newly-built section is very short, with I bride of 92 m long, of which there is a tunnel of 680 m long. The route will pass over Beizhiya that marks offthe east and west part of Langao County, the project is of a bit difficulty with large amounts of protection projects. lmplrio lioitikuincharge Thdchiefoi(ing The environmental protection measures to be adopted and its explementation stage aerM-iarn irihlion issae (I ) adopt kinds oftechniques to keep slopes stable and avoid land erosion (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. enitss- Shaaxi Provincial In design stage (3 ) in consultation with local management departments to make good plans ofthe sites imetunit Highway Bureau for acquisition of land and removal ofit. Designuni (I ) reasonably arrange construction sequence, sectional construction and choice ofadvanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) in consultation with the local management departments to make good plans of the land acquisition and dumping sites. In the process of construction, balance the removal and dump possibly, pile the dumping earthwork in fixed place and protect the sites in time and necessarily so as to avoid huge water and land erosion. Ecological (3 ) for the route along rivers, build ward-off projects rocks from dropping into the rivers Ecological . along the route, and after the completion of the construction, seeds of the local vegetation to keep earthwork and cubic meters ofare sown along the side slopes and issuronmest In constageton the river banks. For the surplus cubic meters of rocks in construction can be filled in the ditches and trenches along the route Langao County issues stage and then covered with soil to restore farming. Traffic Department (4) strictly control the log numbers to be cut down, forbid to get rocks, gravels and earths in the woods. (5) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating in depth. (6) lands occupied by the makeshift projects should be cleared in time and handed over the local authorities for farming restoration after completion. In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is carried Main- Langao County n opstagt n out to each specific section and appoint fixed staff to take charge. tenance Lanc l stage5section 85 EIA and EP Execution Frame of LRIP 5 FrameworkofExecution Program of Environment Protection To be continued Table 5-11 (Langao County) Environment protection action plan program of Landa highway lnmplion hsituLimindcag 7l1rdwiefexisig The environmental protection measures to be adopted and its execution stage irftfion | ~~~~envrnxuru In design ~stage Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by the EMD Shaaxi Provincial In design stage brushing off ofthe side slope. Highway Bureau ( I ) because eht highway is built along the river, the living water pollution and rubbish in the management quarters are Water collectively disposed of without direct drainage into the water (2) keep guard against the machinery oil leakage and the dumping into the water, reinforce environmental management, launch Langao C contractor Traffic Department pollution In construction instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution ofthe water stage (3) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water (4) The waste water at Bozhiya tunnel can be used again after deposition in the sink. In ( ) for the rest of the inhabitants at night, machinery with big noise should be Langao County Traffic Department Noise issue construction stopped working from 22:00 P.M. at night to 6:00 A.M. the next morning. contractor should be kept at sites 150m away from the residential areas. i___________ stage (2) machinery and the mixer used fixedly In Shaaxi Provincial construction Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up necessary EMDt Highway Bureau stage passage ways and replace them with those in water. Langao County Social In construction On-job posts are put up for the traffic safety ofthe pedestrians at the construction section. To reduce the probability of accidents, contractor Traffic Department economy stage effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages are cleared away in time. It is necessary to issue measures against the transportation accidents of dangerous items, and Langao stage Set up a team to meet an emergency by the concerning departments of Langao County County Langao County Environment Protection so as to take immediate actions. EPB Langao County Traffic In operation The falling rocks from the side slope should be done with in time to avoid accidents from happening. Main- tenance Traffic Department safety stage The earths from the foundation excavation should be done with in time when in Langao County In construction, no dumping ofthem into rivers Traffic Department Solid waste construction the consruction wastes, old devices, packages or thrown away at the beach. Aftercompletion,up and rubbishes are to be collectively sealed and carried away outside in time. contractor pollution stage Especially, after bridge construction completion, clear away the pilings and level off in time so as to let the vegetation on the ~~~~~~~~~~~~~river bank to restore as naturally and quickly as possible. Langao County Dust sprayed at the materials stocks, the sites { In construction Dust protection ofthe surrounding road sections should be well made, water should be contractor Tangac Dptnt pustio . stag of construction materials carriage and the construction sites regularly to avoid dust pollution. Construc- In construction In the process of tunnel construction, the breadth must be well controlled in excavation and Traffic Department tion safety stage explosion to avoid huge vibration from affecting the stability of the mountains. contractor 86 EIA and EP Execution Frame of LRIP 5 Frameworkof Execution Program ofEnvironment Protection Table 5- 12 (Langao County) Environment protection action plan program of Shiguan highway Project introduction: it starts at Shimenzheng town and ends at the Guanyuanzheng town, an item to be changed, 35 m inlength. The cubic meters of the earthworks and rocks at road base of the project are 26m3 inten thousand, a county road. Engineering feature: the route goes through the area of huge mountainous ranges, it sets out from the valley of the Panhe river An item to be changed, bridges are 5 of 118 m long. T'hdiief cd*ig The environmental protection measures to be adopted and its explementation stage I nm 1irituiomind &oW firMionemr institution is,ue (1 ) adopt kinds of techniques to keep slopes stable and avoid land erosion Envinxi- (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. menta- Shaaxi Provincial n nntunkt Highway Bureau Design unit (I ) reasonably arrange construction sequence. sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) in consultation with the local management departments to make good plans of the land acquisition and dumping sites. Inthe process of construction, balance the removal and dump possibly, pile the dumping earthwork in fixed place and protect the sites intime and necessarily so as to avoid huge water and land erosion. (3 ) for the route along rivers, build ward-off projects to keep earthwork and cubic meters of rocks from dropping into the Ecological rivers along the route, and after the completion of the construction, seeds of the local vegetation are sown along the side environmen In construction slopes and the river banks. For the surplus cubic meters of rocks inconstruction can be filled in the ditches and trenches contractor Langao County t issues stage along the route and then covered with soil to restore farming. Traffic Department (4) strictly control the log numbers to be cut down, forbid to get rocks, gravels and earths inthe woods. (5) give instructions to the construction staffto protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating indepth. (6) lands occupied by the makeshift projects should be cleared intime and handed over the local authorities for farming restoration after completion. Inoperation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is Main- Langao County stage carried out to each specific section and appoint fixed staff to take charge. tenance Traffic Department stage ~~~~~~~~~~~~~~~~~~~~~~~~~~~~ TafcDprmn Protection indesign of the road sections along the riverside iswell made so as to avoid impacts on the water quality by the Envini- water brushing off ofthe side slope. menitass- Shaaxi Provincial pollution In design stage btntunit Highway Bureau 87 EIA and EP Execution Frame of LRIP 5 FrameworkofExecution Programof Environment Protection (I ) because the highway is built along the river, the living water pollution and rubbish in the management quarters are collectively disposed of without direct drainage into the water. .cosii (2) keep guard against the machinery oil leakage and the dumping into the water, reinforce environmental management, In construction launch instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of the contractor Traffic Department stage ~water. TafcDprmn (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water ( I) for the rest of the inhabitants at night, machinery withbig noise should be In construction Langao County Noise issue stage stopped working from 22:00 P.M. at night to 6:00 A.M. the next morning. contractor Langartment (2 ) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters of the inhabitants. Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up ment: Shaaxi Provincial In design stage necessary passage ways. itnt Hhay Breau Put up necessary traffic signs along the route. Merlumt Highway Bureau In construction On-job posts are put up for the traffic safety of the pedestrians at the construction section. To reduce the probability of Social stage accidents, effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages are contractor Traffic Department economy cleared away in time. It is necessary to issue measures against the transportation accidents of dangerous items, and Set up a team to meet an emergency by the concerning departments ofLangao County Langao In operation Environment Protection so as to take immediate actions. Langa Langao County stage PCount Traffic Department Trafi IThe falling rocks from the side slope should be done with in time to avoid acciderts from happening. Main- Traffic In operation Langao County safety stage sectin Traffic Department The earths from the foundation excavation should be done with in time when in construction, no dumping of them into rivers or thrown away at the beach. After completion, Solid waste In construction the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up and carried away outside in contractor Langao County pollution stage time. Especially, after bridge construction completion, clear away the pilings and level off in time so as to let the vegetation Traffic Department on the river bank to restore as naturally and quickly as possible. Dust In construction Dust protection of the surrounding road sections should be well made, water should be sprayed at the materials stocks, the pollustin stage sites of construction materials carriage and the construction contractor Langao County pollution sites regularly to avoid dust pollution. 88 EIA and EP Ececution Frame of LRIP 5 Framewor-k ofExecution Program ofEnvironment Protection Table 5-13 (Langao County) Environment protection action plan program of Yuehong highway Project introduction: it starts at the Shimenhigh school and ends at the Hongyan primary school, it is to be changed with IOkm of mileage. The cubic meters of the earthworks anf rocks at roas base of the project are 3m3 a village road. Engineering feature: the rout goes through the hillside with mostly bare slopes and many rocks and a few occupation offarmlands and woods and no bad geology. Thediiefekng The environmental protection measures to be adopted and its explementation stage Inroln Inkitinndage emm-n insihfion issue (1 ) adopt kinds oftechniques to keep slopes stable and avoid land erosion Envior- In.desinstag (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. mn tagc Shaaxi Provincial n nntunit Highway Bureau Des4puit (I ) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) in consultation with the local management departments to make good plans of the land acquisition and dumping sites. In the process of construction, balance the removal and dump possibly, pile the dumping earthwork in fixed place and protect the sites in time and necessarily so asto avoid huge water and land erosion. Ecological (3 ) for the route along rivers, build ward-off projects to keep earthwork and cubic meters of rocks from dropping into environment In construction the rivers along the route, and after the completion of the construction, seeds of the local vegetation are sown along the trt Langao County issues stage side slopes and the river banks. For the surplus cubic meters of rocks in construction can be filled in the ditches and conracor Traffic Department trenches along the route and then covered with soil to restore farming. (4) strictly control the log numbers to be cut down, forbid to get rocks, gravels and earths in thewoods. (5) give instructions to the construction staffto protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating in depth. In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is Main- Langao County stane carried out to each specific section and appoint fixed staffto take charge. tenance stage section Traffic Department 89 EIA and EP Execution Franme ofLRIP 5 Framework of Execution Program ofEnvironment Protection To be continued Table 5-13 (Langao County) Environment protection action plan program ofYuehong highway Thediiefeci~ing The environmental protection measures to be adopted and its explementation stage lrriron Instuticninndiai Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by Enviro- In desinsa the brushing off of the side slope. nanta- Shaaxi Provincial Highway Bureau In design stage enmtunit (1) because the highway is built along the river, the living water pollution and rubbish in the management quarters are water collectively disposed of without direct drainage into the water. pollution . (2) keep guard against the machinery oil leakage and the dumping into the water, reinforce environmental management, contractor Langao County In construction launch instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of the water. Traffic Department (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water. ( I) for the rest ofthe inhabitants at night, machinery with big noise should be Langao County i cIn n stopped working from 22:00 P.M. at night to 6:00 A.M. the next moming. Traffic Department NolseIssue stage (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters ofthe inhabitants, contractor and at least 200 m away from the Shimenhigh school and the Hongyan primary school. In designst Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up EPD Shaaxi Provincial necessary passage ways and replace them with those in water Highway Bureau . On-job posts are put up for the traffic safety of the pedestrians at the construction section. To reduce the probability of are contractor Langao County Social In construction accidents, effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages economy cleared away in time. Langao Langao County In operation It is necessary to issue measures against the transportation accidents ofdangerous items, and County Traffic Department stagoper Set up a team to meet an emergency by the concerning departments of Langao County stage Environment Protection so as to take immediate actions. EPD Main- Langao CountyTaffic Traffic In operation The falling rocks from the side slope should be done with in time to avoid accidents from happening. section Department safety stage The earths from the foundation excavation should be done with in time when in Langao County Solid waste In construction construction, no dumping of them into rivers or thrown away at the beach. After completion, contractor in Traffic Department pollution stage the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up and carried away outside time. Langao County In construction Dust protection of the surrounding road sections should be well made, water should be sprayed at the materials stocks, Dust nostage the sites of construction materials carriage and the construction contractor Langartment sites regularly to avoid dust pollution. _________ _ stage 90 EIA and EP Execution Frame ofLRIP S Framework ofExecution ProgramofEnvironnment Protection Table 5- 14 (Langao County) Environment protection action plan program of Xinhua highway Project introduction: it starts at Nongmincun village and ends at Xinghuocun village, an item to be changed, whose mileage Is 5 km. after its completion the width of the road base will be 4.5m, that ofthe road surface is 3.5m all paved with gravels. The investment in plan is Y44 ten thousand yuan, a village road. Engineering feature: the route goeson the hillside with mostly bare slopes and many rocks and a few occupation offarmlands and woods and no bad geology. Thediefeodqng The environmental protection measures to be adopted and its explementation stage bJpTrrtiio bihtninclaW issue (I ) adopt kinds of techniques to keep slopes stable and avoid land erosion (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. mEnen- Shaaxi Provincial In design stage (3 ) in consultation with local land management departments to make good plans mentunit Highway Bureau of sites for land acquisition and removal of it Dn* unit (I ) In the process of construction, balance the removal and dump possibly, pile the dumping earthwork in fixed place and protect the sites in time and necessarily so as to avoid huge water and land erosion (2) for the route along rivers, build ward-off projects to keep earthwork and cubic meters of rocks from dropping into the rivers along the route, and after the completion of the construction, seeds of the local vegetation are sown along the side slopes and the river banks. For the surplus cubic meters of rocks in construction can be filled in the ditches and Ecological trenches along the route and then covered with soil to restore farming. environment (3 ) strictly control the log numbers to be cut down, forbid to get rocks, gravels and earths in the woods. Langao County issues stage (4) parts of the sections are needed to be cut straight. And the mountains abound in biological resources, so it is contractor Traffic Department important to keep the local ecology in good order. (5 ) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating in depth. (6) lands occupied by the makeshift projects should be cleared in time and handed over the local authorities for farming restoration after completion. In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is Main- Langao County sntoprag ion carried out to each specific section and appoint fixed staff to take charge. tenance Langao Count stage section Traffic Department Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by Enviortn water In design the brushing off of the side slope. nrentas- Shaaxi Provincial pollution sneientunit Highway Bureau 91 EIA and EP Execution Frame of LRIP 5 Framework ofExecution ProgramofEnvironment Protection (I ) because the highway is built along the river, the living water pollution and rubbish in the management quarters are collectively disposed of without direct drainage into the water. (2) keep guard against the machinery oil leakage and the dumping into the water, reinforce environmental management, contractor Langao County In construction launch instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of Traffic Department stage the water. (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water. _ _ In construction ( I) for the rest of the inhabitants at night, machinery with big noise should be contractor Langao County Noise issue stage stopped working from 22:00 PM. at night to 6:00 A.M. the next morning. Traffic Department (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters of the inhabitants. Envion- In design stage mentass Shaaxi Provincial Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up mentunit Highway Bureau necessary passage ways and replace them with those in water To reduce the probability of In construction On-job posts are put up for the traffic safety of the pedestrians at the construction section. passages are contractor Traffic Department stage accidents, effective safety and warning measures are taken in doing explosive work. The earth pilings in the Social cleared away in time. of dangerous items, and Langao economy In operation It is necessary to issue measures against the transportation accidents County stage Set up a team to meet an emergency by the concerning departments of Langao County Envrion- Environment Protection so as to take immediate actions. ment LrangceaorCounty Protection Traffic Department Depart- ment Main- Langao Countv Traffic In operation The falling rocks from the side slope should be done with in timeto avoid accidents from happening. tenance LagoCut saey stage section Traffic Department safety In construction The earths from the foundation excavation should be done with in time when in contractor Langao County Solid waste stage construction, no dumping of them into rivers or thrown away at the beach. After completion, up and carried away outside in Traffic Department pollution the consruction wastes, old devices, packages and rubbishes are to be collectively sealed time. at the materials stocks, Dust In construction Dust protection of the surrounding road sections should be well made, water should be sprayed contractor Traffic Department pollution stage the sites of construction materials carriage and the construction sites regularly to avoid dust pollution. 92 EIA and EPExecution Fanme of LRIP 5 Framework of Execution ProgramofEnvironment Protection Table 5-15 (Langao County) Environment protection action plan program of Tuanyuan highway Project introduction: it starts at the Bawangzhuang village ofTuanyuan village and ends at the Zhangliangzi ofZhongwu village of an item to be changed, whose mileage is 6km. after the completion the width of the road base is 4.5 m., that ofthe road surface is 3.5 m., a village road. Engineering feature: the route goes along the streams with mostly bare slopes and many rocks and a few occupation of farmlands and woods and no bad geology. The chiefe.ashng fiTpiont Institoin incha g envnrm-tn The environmental protection measures to be adopted and its explementation stage instiln is3ge (I ) adopt kinds oftechniques to keep slopes stable and avoid land erosion Envnu}- In.designstag (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. mnitas Shaaxi Provincial In design stage (3) inconsultation with local land management departments to make good plans of the mntunit Highway Bureau Sites for land acquisition and removal of it. Dsunft (I ) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. Langao County (2) In the process of construction, balance the removal and dump possibly, pile the dumping earthwork infixed place contractor Traffic Department and protect the sites intime and necessarily so as to avoid huge water and Ecological land erosion. environment . (3) for the route along rivers, build ward-off projects to keep earthwork and cubic meters of rocks from dropping into issue stare the rivers along the route, and after the completion of the construction, seeds of the local vegetation are sown along the stage side slopes and the river banks. For the surplus cubic meters of rocks in construction can be filled in the ditches and trenches along the route and then covered with soil to restore farming. Langao County (4) strictly control the log numbers to be cut down, forbid to get rocks, gravels and earths in the woods. contractor Traffic Department (5) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is Man- Langao County stage carried out to each specific section and appoint fixed staff to takecharge. tenance Traffic Department section 93 Franmework of Execution Programof Environment Protection EIA and EP Execution Frame ofLRIP 5 To be continued Table 5-15 (Langao County) Environment protection action plan program of Xinhua highway Im~~~~~~~~~~~~~~~~~~~~~~~~rpie on Ins(utio indhage Tne chiefeising irEituticu envrinc*n The environmental protection measures to be adopted and its execution stage Enviin- rnrtaa- Shaaxi Provincial In design stage Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by the brushing off of the side slope. mentunit Highway Bureau Designunit (I ) because the highway is built along the river, the living water pollution and rubbish in themanagement quarters are water collectively disposed of without direct drainage into the water. environmental management, pollution (2) keep guard against the machinery oil leakage and the dumping into the water, reinforce Langao County In construction launch instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of contractor Traffc Department stage the water. (3) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water. ( I ) for the rest of the inhabitants at night, machinery with big noise should be contractor Langao County Noise issue In construction stopped working from 22:00 P.M. at night to 6:00 A.M. the next moming. of the inhabitants. Traffic Department stage (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters EAD Shaaxi Provincial In design stage Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up Highway Bureau necessary passage ways and replace them with those in water __In________stage Langao County In construction On-job posts are put up for the traffic safety of the pedestrians at the construction section. To reduce the probability of the passages are contractor Traffic Department Social stage accidents, effective safety and warning measures are taken in doing explosive work. The earth pilings in economy cleared away in time. Langao Langao County In operation It is necessary to issue measures against the transportation accidents of dangerous items, and County Traffic Department stagoperabon Set up a team to meet an emergency by the concerning departments of Ziyang County Environment Protection so as to take immediate actions. EPD ~~~~~~ ~~~~~~~~~~~~~~~~~~Ma Traffic In operation tenance Langao County Trafetc In operation The falling rocks from the side slope should be done with in time to avoid accidents from happening. secti.on Traffic Department safety stage The earths from the foundation excavation should be done with in time when in Langao County Solid waste In construction construction, no dumping ofthem into rivers or thrown away at the beach. After completion, and carried away outside in contractor Traffic Department pollution stage the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up time. at the materials stocks, Langao County Dust In construction Dust protection of the surrounding road sections should be well made, water should be sprayed contractor Traffic Department pollution stage the sites of construction materials carriage and the construction sites regularly to avoid dust pollution. ____________ 94 EIA and EP Execution Frame of LRIP 5 Frameworkof Execution ProgramofEnvironment Protection Table 5-16 (Ziyang County) Environment protection action plan program of Dongshuan highway Project introduction: it starts at Tonghe river and ends in Shuanqiaozheng town with a full length of39km, an item to be changed of 29km, and newly-built 10 km. the cubic meters ofthe earthworks and rocks at road base of the project are 30m3 in ten thousand. Engineering feature: the route goes through the area of huge mountainous ranges and is lined in the valley of the river there is newly built section with a 26 bridges of 400 m. long . ThediefeEsDng The environmental protection measures to be adopted and its explementation stage Inplb n Inrtikn indcarg envriatnn instution issje (I ) adopt kinds of techniques to keep slopes stable and avoid land erosion Envnxi- In desinstag (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. mentas- Shaaxi Provincial In design stage mentunit Highway Bureau De*unit (I ) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) as parts of the sections are needed to be cut straight, and the the mountain areas abound in rich biological resources, so it is important to keep local ecology in good order. Ecological . (3 ) in consultation with the local management departments to make good plans of the land acquisition and dumping sites. In environment stage the process of construction, balance the removal and dump possibly, pile the dumping earthwork in fixed place and protect the contractor Ziyang County issue sites in time and necessarily so as to avoid huge water and land erosion. Traffic Department (4) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating in depth. In operation The highway maintenance units should take up the task ofecology protection of the highways along the route, which is carried Main- Ziyang County stage out to each specific section and appoint fixed staff to take charge. tenance Traffic Department stage ~~~~~~~~~~~~~~~~~~~~~~~~~ Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by the Fnviuru- water In design stage brushing off of the side slope. menta Shaaxi Provincial pollution I)aigntunit Highway Bureau 95 EIA and EP Execution Frame oJ LRIP 5 Frameworkof ExecutionProgram ofEnvironment Protection (1 ) because the highway is built along the river, the living water pollution and rubbish in the management quarters are construction collectively disposed ofwithout direct drainage into the water. Ziyang County In constructlon (2) keep guard against the machinery oil leakage and the dumping into the water, reinforce environmental management, launch Traffic Department stage instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution ofthe waterc (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water In construction ( I) for the rest of the inhabitants at night, machinery with big noise should be Ziyang County contractor Traffic Department Noise issue stage stopped working from 22:00 P.M. at night to 6:00 A.M. the next morning. (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters of the inhabitants XEnvirm- In designst Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up necessary rrmeta- Shaaxi Provincial passage ways and replace them with those in water. nmelunit Highway Bureau ~~~~~~~~~~~~~~~~~~~~~~~~~ _ unit Ziyang County construction On-job posts are put up for the traffic safety ofthe pedestrians at the construction section. To reduce the probability of accidents, contractor Traffic Department .aIn effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages are cleared away in Social time. Ziyang Ziyang County economy It is necessary to issue measures against the transportation accidents of dangerous items, and Set up a team to meet an emergency by the concerning departments of Ziyang County County Traffic Department In opeaEnvironment Protection so as to take immediate actions. Envrion- In operation Protment stage Protection Depart- ment Main- Ziyang County Traffic In operation The falling rocks from the side slope should be done with in time to avoid accidents from happening. tenance Traffic Department safety Stage section 96 EIA and EP Execution Frameof LRIP f Frameworkof Execution ProgramojfEnvironment Protection Table 5-17 (Ziyang County) Environment protection action plan program of Waliao highway Project introduction: itstarts at Wafangdian and ends at Liaoyuan with a full length of38km mileage to ebe changed. The cubic meters of earthworks and rocks at road base of the project ae 20rm3 in ten thousand. Engineering feature: the route goes through the area of huge mountainous ranges, and is lined in the valley oalong the river , construction land accounts for 10 % of the farmlands and wood lands or so. It is an item to be changed. Bridges are lO in 287m long. Thechiefedsing The environmental protection measures to be adopted and its explementation stage Irbriponm Iit1u indage envnaerrn inskbtorl issue (I) adopt kinds of techniques to keep slopes stable and avoid land erosion Enviut- In.desinstag (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. mn-tag- Shaaxi Provincial In design stage ttit HgwyBra mntounit Highway Bureau Desgunit (I) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) parts of the sections are needed to be cut straight, and the mountains abound in biological resources, so it is important to keep the local ecology in good order. Ecological . (3 ) get earths collectively and take measures of water and soil preservation, then level environment stage off the ground and cover it with greenage. contractor Ziyang County issues (4) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to Traffic Department vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating in depth. (5) lands occupied by the makeshift projects should be cleared in time and handed over the local authorities for farming restoration after completion In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is carried Main- Ziyang C stage out to each specific section and appoint fixed staff to take charge. tenance Traffic Deparment section Dprmn Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by the Enrviro- brushing off of the side slope. mentas Shaaxi Provincial In design stagenit- ShaiPoncl rmetunit Highway Bureau water (I) because the highway is built along the river, the living water pollution and rubbish in the management quarters are pollution In construction collectively disposed of without direct drainage into the water. stage (2) keep guard against the machinery oil leakage and the dumpirg into the water, reinforce environmental management, launch Ziyang County stage instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of the water contractor Traffic Department (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water 97 EIA and EP Execution Frame of LRIP 5 Framework ofExecution ProgramoJ Environment Protection In construction ( I ) for the rest ofthe inhabitants at night, machinery with big noise should be Noise issue stage stopped working from 22:00 PM. at night to 6:00 A.M. the next morning. contractor Trafc Dptnt (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters of the inhabitant. In construction Build up ward-off walls where ther is section of loosing earths (K2+100). Bad geology stage Refill the section (K13+220) in change of the soft earth base. contractor Traffic Department In designstaTake into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up necessary menta- Shaaxi Provincial In design stage passage ways and replace them with those in water mnrtunit Highway Bureau DesigSunit In construction On-job posts are put up for the traffic safety of the pedestrians at the construction section. To reduce the probability of accidents, stage effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages are cleared away in contractor Traffic Department Social time. economy It is necessary to issue measures against the transportation accidents of dangerous items, and Ziyang Set up a team to meet an emergency by the concerning departments ofZiyang County County In opeaEnvironment Protection so as to take immediate actions. Envrion-County Intoperabn ment Traffic Department Protection Depart- ment Traffic In operation The falling rocks from the side slope should be done with in time to avoid accidents from happening. Main- Ziyang County Trafety Intagerto tenance Traffic Department safety section | stage The earths from the foundation excavation should be done with in time when in Solid waste In construction construction, no dumping of them into rivers or thrown away at the beach. After completion, pollution stage the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up and carried away outside in time. contractor Ziyang County Especially, after bridge construction completion, clear away the pilings and level off in time so as to let the vegetation on the river bank to restore as naturally and quickly as possible. Dust In construction Dust protection of the surrounding road sections should be well made, water should be sprayed at the materials stocks, the sites Ziyang County pollution stage of construction materials carriage and the construction contractor Traffic Department pollution sites regularly to avoid dust pollution. 98 EIA and EP Execution Frame ofLRIP 5 FrameworkofExecution Programof EnvironmentProtection Table 5- 18 (Ziyang County) Environment protection action plan program of Quanhe highway Project introduction: it starts at the rivermouth of Quanhekou and ends in the Huishui river, an item to be changed ofa mileage of 80.12km. the cubic meters ofearthworks and rocks at road base are 30m3 inten thousand. Engineering feature: the route goes through the Daba mountains where ther is bad topography and geology and is liable to slan slide Slidslope etc, there is some difficulty inthe project construction. The diefexsing The environmental protection measures to be adopted and its explementation stage ImpleTitm liicuwon indarge envxmentn jnstituion issue (I ) adopt kinds of techniques to keep slopes stable and avoid land erosion Enviirx- In desinstag (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. mntas- Shaaxi Provincial I nntunit Highway Bureau Deig*unt I ) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to trt Ziyang County reduce as much damage to the vegetation along the route as possible. conraco Traffic Depament (2) parts of the sections are needed to be cut straight, and the mountains abound in biological resources , so itis important to keep the local ecology ingood order. Ecological . (3 ) get earths collectively and take measures ofwater and soil preservation, then level environment start off the ground and cover it with greenage. issue ge (4) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to Ziyang County vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the contractor an Depaoment section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating indepth. (5) lands occupied by the makeshift projects should be cleared in time and handed over the local authorities for farming restoration after completion. In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is carried Main- Ziyang County stage out to each specific section and appoint fixed staff to take charge. tenance Traffic Depament ~~~~~~~ ~ ~~~~~~~~~~~~~ _____________ Dprmn Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by the Enviric- In design stage brushing off ofthe side slope. mentas Shaaxi Provincial ntunit Highway Bureau Design unit water (I ) because the highway is built along the river, the living water pollution and rubbish in the management quarters are pollution In construction collectively disposed of without direct drainage into the water. In constageto(2) keep guard against the machinery oil leakage and the dumping into the water, reinforce environmental management, launch Ziyang County instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of the water Traffic Department (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water 99 EIA and EP Execution Frame of LRIP 5 Framework ofExecution Programof EnvironmentProtection To be continued Table 5-18 (Ziyang County) Environment protection action plan program of Quanhe highway The diefdxsing The environmental protection measures to be adopted and its explementation stage lmplrnipem 1nkitlincharge In construction (1 ) for the rest ofthe inhabitants at night, machinery with big noise should be Noise issue stage stopped working from 22:00 P.M. at night to 6:00 A.M. the next moming. contractor Traffic Department (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters of the inhabitants. In construction Clear away the loose mountainous body at sections (k64+320) where there are slidding slopes and Bad geology stage Build word-off earthwork walls, contractor Tranc Cepartment Envu'Ui- In design stage Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up necessary mentas- Shaaxi Provincial passage ways and replace them with those in water. n-otunit Highway Bureau Designunit In construction On-job posts are put up for the traffic safety of the pedestrians at the construction section. To reduce the probability of accidents, Ziyang County stage effective safety and waming measures are taken in doing explosive work. The earth pilings in the passages are cleared away in contractor Traffic Department Social time. economy It is necessary to issue measures against the transportation accidents of dangerous items, and Ziyang Set up a team to meet an emergency by the concerning departments of Ziyang County County In opeaEnvironment Protection so as to take immediate actions. Envrion- In operation met Ziyang County stage ment Traffic Department Protection Depart- ment Traffic In operation The falling rocks from the side slope should be done with in time to avoid accidents from happening. Main- Ziyang County safety stage senance Traffic Department The earths from the foundation excavation should be done with in time when in Solid waste In construction construction, no dumping of them into rivers or thrown away at the beach. After completion, pollution stage the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up and carried away outside in time. contractor Traffic Department Especially, after bridge construction completion, clear away the pilings and level off in time so as to let the vegetation on the river bank to restore as naturally and quickly as possible. Dust In construction Dust protection of the surrounding road sections should be well made, water should be sprayed at the materials stocks, the sites pollution stage of construction materials carriage and the construction contractor Ziyang County sites regularly to avoid dust pollution. 100 EIA and EP Execution Frame of LRIP 5 FrameworkofExecution Program of Environment Protection Table 5-19 (Ziyang County) Environment protection action plan program of Maowa highway Project introduction: it starts at Maoba and ends at Wamiao temple, an item to be changed with a mikeage of 15.5km. The cubic meters of earthworks and rocks at road base of the project are 6m' in ten thousand. Environment feature: it is lined in the valley along the river, an item to be changed with 2 bridges of 34m. in length. Engineering feature: most ofthe route goes through the area of mountainous ranges within whcihthere are big and strrp slopes with many la e ditches in between but a high coverage of greenage. Thdchiefoedsing Imple1ni Inroninchage ernmn" The environmental protection measures to be adopted and its explementation stage infitutik issue (I ) adopt kinds of techniques to keep slopes stable and avoid land erosion Envirn- In design stage (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. mentas- Shaaxi Provincial mnitunit Highway Bureau (I ) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) parts of the sections are needed to be cut straight, and the mountains abound in biological resources , so it is important to keep the local ecology in good order. (3 ) get earths collectively and take measures of water and soil preservation, then level Ecological . off the ground and cover it with greenage. In the process of the construction, well balance the earths acquisition and dumping, environment In construction pile the earths at fixed places, then level off the ground and cover it with greenage. The dumping sites should be protected well contractor Ziyang County issues ge and in time to avoid huge land erosion. Traffic Department (4) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating in depth. (5) lands occupied by the makeshift projects should be cleared in time and handed over the local authorities for farming restoration after completion In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is carried Main- Ziyang County stage out to each specific section and appoint fixed staff to take charge. tenance Traffic Department stage ~~~~~~~~ ~~~~~~~~~~~~~~~~~~ TafcDprmn Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by the Enviwm- water In design stage brushing off of the side slope. menta Shaaxi Provincial pollution mentunit Highway Bureau Designunit 101 EIA and EP Execution Frame of LRIP 5 Framework of Execution Programof EnvironmentProtection (1) because the highway is built along the river, the living water pollution and rubbish in the management quarters are In construction collectively disposed of without direct drainage into the water. management, launch Ziyang County st (2) keep guard against the machinery oil leakage and the dumpirg into the water, reinforce environmental instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of the water Traffic Department (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water In construction (I ) for the rest of the inhabitants at night, machinery with big noise should be Ziyang County contractor Traffic Department Noise issue stage stopped working from 22:00 P.M. at night to 6:00 A.M. the next morning. (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters of the inhabitants. Envliuri menta Shaaxi Provincial In design stage Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up necessary Highway Bureau passage ways and replace them with those in water. mnftunit Desigunit Social In construction On-job posts are put up for the traffic safety ofthe pedestrians at the construction section. To reduce the probability ofaccidents, in the passages are cleared away in contractor Traffic Department economy stage effective safety and warning measures are taken in doing explosive work. The earth pilings time. Ziyang It is necessary to issue measures against the transportation accidents of dangerous items, and County Traffic Department stage Set up a team to meet an emergency by the concerning departments ofZiyang County Environment Protection so as to take immediate actions. EPD Main- Ziyang County Traffic In operation The falling rocks from the side slope should be done with in time to avoid accidents from happening. tenance Traffic Department safety stage ~~~~~~~~~~~~~~~~~~~~~~~~~ safety The earths from the foundation excavation should be done with in time when in Soli waste In construction construction, no dumping of them into rivers or thrown away at the beach.After completion, away outside in time. contractor Traffic Department pohdlwstin stage the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up and carried Especially, after bridge construction completion, clear away the pilings and level off in time so as to let the vegetation on the river bank to restore as naturally and quickly as possible. Ziyang County Dust In construction Dust protection of the surrounding road sections should be well made, water should be sprayed at the materials stocks, the sites contractor Zic Count pollution stage of construction materials carriage and the construction Traffic Deparment pollution sites regularly to avoid dust pollution. 102 EIA andEP Execution Frame ofLRIP 5 Framework ofExecution ProgramofEnvironment Protection Table 5-20 (Ziyang County) Environment protection action plan program of Gaowan highway Project introduction: starts at Gaotan and ends at Wanxing, an itm to be changed of a mileage of 11. 5km. the cubic meters of the earthworks and rocks at road bas ofthe project are 4.46 m3 in ten thousand. Engineering feature: the route goes through the area ofhuge mountainous ranges and is lined in the valley along the Waxihe River. It is an item to be changed with 2 bridges of 26m long. ThehdiefeEing The environmental protection measures to be adopted and its explementation stage Implion lnsitunom indiarge cnvrcmion insfihion issue (1) adopt kinds of techniques to keep slopes stable and avoid land erosion Enviirr- In.desinstag (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. menitas- Shaaxi Provincial I nntunit Highway Bureau Deiunit (I) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) parts of the sections are needed to be cut straight, and the mountains abound in biological resources , so it is important to keep the local ecology in good order. (3 ) get earths collectively and take measures ofwater and soil preservation, then level Ecological In construction off the ground and cover it with greenage. In the process of the construction, well balance the earths acquisition and dumping, environment stage pile the earths at fixed places, then level off the ground and cover it with greenage. The dumping sites should be protected well contractor Ziyang County issue and in time to avoid huge land erosion. Traffic Department (4) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating in depth. (5) lands occupied by the makeshift projects should be cleared in time and handed over the local authorities for farming restoration after completion In operation The highway maintenance units should take up the task ofecology protection of the highways along the route, which is carried Main- Ziyang County stage out to each specific section and appoint fixed staff to take charge. tenance Traffic Department section Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by the Envii-f water . t brushing off of the side slope. mntasss Shaaxi Provincial pollution In design stage mehtunit Highway Bureau Designunik 103 EIA and EP Execution Frame ofLRIP 5 Frameworkof ExecutionProgram ofEnvironnment Protection ( ) because the highway is built along the river, the living water pollution and rubbish in the management quarters are cInstruction collectively disposed of without direct drainage into the water. Inage (2) keep guard against the machinery oil leakage and the dumpirg into the water, reinforce environmental management, launch Ziyang County instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of the water. Traffic Department (3 ) construction materials like bitumen, oil and chemicais can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainsbrm from blowing and washing into the water. In construction ( I) for the rest ofthe inhabitants at night, machinery with big noise should be Ziyang County Noise issue stage stopped working from 22:00 P.M. at night to 6:00 A.M. the next morning. Noise issue stage machinery and the mixer used fixedly should be kept at sites 150m away from the contractort(2)Traffc Department _ ~~~~~~~~~living quarters ofthe inhabitants. Enviir, In designstaTake into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up necessary merasta Shaaxi Provincial passage ways and replace them with those in water. nmitunit Highway Bureau Designunkt In construction On-job posts are put up for the traffic safety ofthe pedestrians at the construction section. To reduce the probability of accidents, Ziyang County stage effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages are cleared away in contractor Traffic Department Social time. economy It is necessary to issue measures against the transportation accidents of dangerous items, and Ziyang Set up a team to meet an emergency by the concerning departments ofZiyang County County In operation Environment Protection so as to take immediate actions. Ziyang County stage Protection Traffic Department Depart- ment Trafi IThe falling rocks from the side slope should be done with in time to avoid accidents Main- Ziyang County Traffic Intoperaio from happening. tenance Traffic Department Traffic Department safety stage section The earths from the foundation excavation should be done with in time when in Solid waste In construction construction, no dumping of them into rivers or thrown away at the beach. After completion, pohdlwstin stage the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up and carried away outside in time. contractor Ziyang County pollution Especially, after bridge construction completion, clear away the pilings and level off in time so as to let the vegetation on the Traffic Department river bank to restore as naturally and quickly as possible. Dust In construction Dust protection of the surrounding road sections should be well made, water should be sprayed at the materials stocks, the sites pollustin stage of construction materials carriage and the construction contractor Traffic DepartCent 104 EIA and EP Execution Frame ofLRIP 5 Franeworkof Execution Program ofEnvironmentProtection Table 5-21 (Ziyang County) Environment protection action plan program of Banjie highway Project introduction: starts at Batao and ends at Jielin, an item to be changed with a mileage of 17km. the cubic meters of the earhworks and rocks at road base of the project are 6.8m3. Engineering feature: the route goes through the area ofhuge mountaninous ranges and isline inthe valley along the Badao river, an item to be changed with I bridge of Im long. Thediefdisung The environmental protection measures to be adopted and its explementation stage lmplrnip n linitionin dar envrtni inlitlio issue (I) adopt kinds of techniques to keep slopes stable and avoid land erosion EnviIcu- Indesign stage ((2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. mentas Shaaxi Provincial n nntunit Highway Bureau Designunit (I) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2)parts of the sections are needed to be cut straight, and the mountains abound inbiological resources , so it is important to keep the local ecology ingood order. (3 ) get earths collectively and take measures of water and soil preservation, then level Ecological . off the ground and cover it with greenage. In the process of the construction, well balance the earths acquisition and dumping, environment In construction pile the earths at fixed places, then level off the ground and cover it with greenage. The dumping sites should be protected well contractor Ziyang County issue and in time to avoid huge land erosion. Trafffic Department (4) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating indepth. (5) lands occupied by the makeshift projects should be cleared in time and handed over the local authorities for farming restoration after completion In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is carried Main- Ziyang County out to each specific section and appoint fixed staff to take charge. tenance Ziyang Count stage section Traffic Department Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by the Enviin- water brushing off of the side slope. menta- Shaaxi Provincial pollution Indesign stage mentunit Highway Bureau IDeiguritI 105 EIA and EP Execution Frame of LRIP 5 Frameworkof Execution ProgramofEnvironment Protection ( I) because the highway is built along the river, the living water pollution and rubbish in the management quarters are construction collectively disposed of without direct drainage into the water. contractor Ziyang County In (2) keep guard against the machinery oil leakage and the dumping into the water, reinforce environmental management, launch instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of the water Traffic Department (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water _ In construction (I ) for the rest of the inhabitantsat night, machinery with big noise should be contractor Ziyang County Noise issue stage stopped working from 22:00 PM. at night to 6:00 A.M. the next morning. Traffic Department (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters of the inhabitants EnvirurF Shaaxi Provincial In designst Take into full consideration ofthe impacts of the road to be changed upon safe passage in the duration and build up necessary n-tas- Highway Bureau passage ways and replace them with those in water. n-itunit Dlggigunit In construction On-job posts are put up for the traffic safety of the pedestrians at the construction section. To reducethe probability of accidents, are cleared away in contractor Traffic Department stage effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages Social time. Ziyang economy In operation It is necessary to issue measures against the transportation accidents ofdangerous items, and County stage Set up a team to meet an emergency by the concerning departments ofZiyang County Ziyang County Environment Protection so as to take immediate actions. Envrion- Protection Traffic Department Depart- ment Main- Shaaxi Provincial Traffic In operation The falling rocks from the side slope should be done with in time to avoid accidents from happening. section Highway Bureau safety stage The earths from the foundation excavation should be done with in time when in Solid waste In construction construction, no dumping ofthem into rivers or thrown away at the beach.After completion, away outside in time. contractor Ziyang County polluwasti stage the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up and carried let the vegetation on the Traffic Department pollution Especially, after bridge construction completion, clear away the pilings and level off in time so as to river bank to restore as naturally and quickly as possible. Dust In construction Dust protection of the surrounding road sections should be well made, water should be sprayed at the materials stocks, the sites Ziyang County contractor Traffic Department pollution stage of construction materials carriage and the construction sites regularly to avoid dust pollution. 106 EIA and EP Execution Frame ofLRIP 5 Framework of Execution Program of Environment Protection Table 5-22 (Ziyang County) Environment protection action plan program of Lianfen highway Project introduction: the start placein joined at Laojie street of the Tonghezheng town with the Lanzi road and ends at The Lianfen primary school, an item to be changed of a mileage of5km. the cubic meter of the earthworks and rocks at road base ofthe project are 4 m3 thousand. Engineering fature: the route mostly goes through farm- and sheepherd lands with a big coverage of greenage. knpon~ hiai incharg Tle dliefxSig eonriln The environmental protection measures to be adopted and its explementation stage isitiuon issue Envircn- (I ) adopt kinds of techniques to keep slopes stable and avoid land erosion Shaaxi Provincial In designstag(2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. mnitas mertunit Highway Bureau Deinunit (I ) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) parts of the sections are needed to be cut straight, and the mountains abound in biological resources, so it is important to keep the local ecology in good order. Ecological then level . (3 ) get earths collectively and take measures ofwater and soil preservation, and dumping, contractor Ziyang County environment In construction off the ground and cover it with greenage. In the process of the construction, well balance the earths acquisition should be protected well Traffic Department issues g pile the earths at fixed places, then level off the ground and cover it with greenage. The dumping sites and in time to avoid huge land erosion. (4) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. (5) lands occupied by the makeshift projects should be cleared in time and handed over the local authorities forfarming restoration after completion Main- Ziyang County In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is carried tenance Traffic Department stage out to each specific section and appoint fixed staff to take charge. ~~~~~~~~~~~~~~~~~~~~~~~~~ stage Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by the Enviirtn nta Shaaxi Provincial In designstag brushing off of the side slope. mnntunit Highway Bureau Desigrunit water (I ) because the highway is built along the river, the living water pollution and rubbish in the management quarters are pollution In construction collectively disposed of without direct drainage into the water. Ziyang County ns u o (2 ) keep guard against the machinery oil leakage and the dumping into the water, reinforce environmental management, launch ZiagCut stage intuto apin earcontractor instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of the water Traffic Department (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water 107 EIA and EP Execution Frame of LRIP 5 Framework ofExecution Program ofEnvironment Protection In construction (I ) for the rest of the inhabitants at night, machinery with big noise should be Noise issue stage stopped working from 22:00 P.M. at night to 6:00 A.M. the next morning. contractor Ziyang County (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters ofthe inhabitants. Taffc Department Envrn In designstaTake into full consideration of the impacts of the road to be changed Indesign stagenitnt upon safe passage in the duration and build up necessary n=ata- Shaaxi Provincial HgwyBra passage ways and replace them with those in water. mentunit Highway Bureau Designiunit In construction On-job posts are put up for the traffic safety of the pedestrians at the construction section. To reduce the probability of accidents, Ziyang County stage effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages are cleared away in contractor Traffic Department Social time. economy It is necessary to issue measures against the transportation accidents of dangerous items, and Ziyang Set up a team to meet an emergency by the concerning departments of Ziyang County County In opeaEnvironment Protection so as to take immediate actions. Envrion- In operation Zlmentyang County stage Protection Traffic Departnent Depart- ment Traffic In operation The falling rocks from the side slope should be done with in time to avoid accidents from happening. Main- Ziyang County safety stage tenance Traffic Department safety ~~~~~~~~~~~~~~~~~~~~~~~~~ The earths from the foundation excavation should be done with in time when in Solid waste In construction construction, no dumping of them into rivers or thrown away at the beach. After completion, C pollution stage the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up and carried away outside in time. contractor Ziyang County Especially, after bridge construction completion, clear away the pilings and level off in time so as to let the vegetation on the Traffc Department river bank to restore as naturally and quickly as possible. In construction Dust protection of the surrounding road sections should be well made, water should be sprayed at the materials stocks, the sites DustZiagCut stage of construction materials carriage and the construction contractor Ziyang County pollution sites regularly to avoid dust pollution. Traffic Department 108 EIA and EP Execution Frame ofLRIP 5 Frameworkof Execution Program ofEnvironment Protection Table 5-23 (Ziyang County) Environment protection action plan program of Shijiacun highway Project introduction: starts at the brook mouth of Shimenwan and ends at the 3rdgroup of Shijiacun village, an item to be changed with a mileage of 5km, the investment in plan is Y 31.41 yuan in ten thousand. The cubic meters of the earthworks and rocks at road base of the project are 1.2m3 in ten thousand. Engineering feature: the route goes through the southern bank of Hanjiang river and is lined accoedingly An item to be changed With 13 culverts. Thediefdisng The environmental protection measures to be adopted and its explementation stage ln1plaTnio InmJbnitindiarie erMioner instAlmo issue (1 ) adopt kinds of techniques to keep slopes stable and avoid land erosion Envfior- In.desinstag (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. mertasss- Shaaxi Provincial In design stage mentunit Highway Bureau Desigr uni't (I ) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) parts of the sections are newly built, and the mountains abound in biological resources, so it is important to keep the local ecology in good order. Ecological In construction (3 ) get earths collectively and take measures of water and soil preservation, then level environment Strci off the ground and cover it with greenage. In the process of the construction, well balance the earths acquisition and dumping, contractor Ziyang County issue stage pile the earths at fixed places, then level off the ground and cover it with greenage. The dumping sites should be protected well Traffic Department and in time to avoid huge land erosion. (4) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. (5) lands occupied by the makeshift projects should be cleared in time and handed over the local authorities for farming restoration after completion In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is carried Main- Ziyang County stage out to each specific section and appoint fixed staff to take charge. tenance Traffic Department section Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by the Environ- water In design stage brushing off of the side slope. mta Shaaxi Provincial pollution nitunit Highway Bureau D10un9 109 EIA and EPExecution Frame ofLRIP 5 Framework of Execution Program of Environment Protection (1 ) because the highway is built along the river, the living water pollution and rubbish in the management quarters are collectively disposed of without direct drainage into the water. Ziyang County In construction (2) keep guard against the machinery oil leakage and the dumpirg into the water, reinforce environmental management, launch contractor Traffic Department stage instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution ofthe water (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water In construction (I ) for the rest of the inhabitants at night, machinery with big noise should be Ziyang County contractor Traffic Department Noise issue stage stopped working from 22:00 PM. at night to 6:00 A.M. the next morning. (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters of the inhabitants. Envirc- In designsta Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up necessary mentass Shaaxi Provincial passage ways and replace them with those in water. mentunit Highway Bureau Designunit Ziyang County In construction On-job posts are put up for the traffic safety of the pedestrians at the construction section. To reduce the probability of accidents, contractor Traffic Department stage effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages are cleared away in Social time. Ziyang economy It is necessary to issue measures against the transportation accidents of dangerous items, and Set up a team to meet an emergency by the concerning departments of Ziyang County County In operation Environment Protection so as to take immediate actions. Envrion- Protection Traffic Department stage Depart- ment Main- Ziyang County Traffic In operation The falling rocks from the side slope should be done with in time to avoid accidents from happening. tenance Traffic Departmenit safety stage ~~~~~~~~ ~~~~~~~~~~~~~~~~~~ _ _ _ _ _ _ _ _ _ _ _____________ The earths from the foundation excavation should be done with in time when in Solid waste In construction construction, no dumping of them into rivers or thrown away at the beach.After completion, outside in time. contractor Traffic Department pollution stage the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up and carried away Especially, after bridge construction completion, clear away the pilings and level off in time so as to let the vegetation on the river bank to restore as naturally and quickly as possible. Ziyang County Dust In construction Dust protection of the surrounding road sections should be well made, water should be sprayed at the materials stocks, the sites contractor Traffc Departnent pollution stage of construction materials carriage and the construction sites regularly to avoid dust pollution. 110 EIA and EPExecution Frame ofLRIP 5 Framework of Execution ProgramofEnvironnzent Protection Table 5-24 (Ziyang County) Environment protection action plan program of Tianchang highway Project introduction: the start point is linked at the bridge end of the Changtaogou bridge of the Hengziroad and ends at The 2nd group of Tianxing village, an item to be changed of a mileage of2km. the cubic meters of earthworks and rocks at road base ofthe project are 2 m3. a village raod. Engineering feature: the item occupies less farmlands and wood lands, there is no bad geology Thechiefedistng The environmental protection measures to be adopted and its explementation stage Impltio Irtutionindar envrinlrrn isit (I ) adopt kinds oftechniques to keep slopes stable and avoid land erosion Envirnn- In design stage (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. noata- Shaaxi Provincial n nnturit Highway Bureau Deigunit (I ) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) in consultation with the local management departments to make good plans of the land acquisition and dumping sites. In the process of construction, balance the removal and dump possibly, pile the dumping earthwork in fixed place and protect the sites in time and necessarily so as to avoid huge water and land erosion. Ecological (3 ) for the route along rivers, build ward-off projects to keep earthwork and cubic meters of rocks from dropping into environment In construction the rivers along the route, and after the completion of the construction, seeds of the local vegetation are sown along the Ziyang Coun issues stage side slopes and the river banks. For the surplus cubic meters of rocks in construction can be filled in the ditches and contractor Traffnc Department trenches along the route and then covered with soil to restore farming. (4) strictly control the log numbers to be cut down, forbid to get rocks, gravels and earths in the woods. ( 5) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. when in construction ofroad foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating in depth. In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is Main- Ziyang County stage carried out to each specific section and appoint fixed staffto take charge. tenance Traffic Department Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by Envirun- water . the brushing off of the side slope. n sta- Shaaxi Provincial pollution meIntunit Highway Bureau _ Designunn Illl EIA and EP Execution Frame ofLRIP S Frameworkof Execution Programof Environment Protection (I ) because ethe highway is built along the river, the living water pollution and rubbish in the management quarters are collectively disposed of without direct drainage into the water Iconstruction (2) keep guard against the machinery oil leakage and the dumping into the water, reinforce environmental management, stage launch instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of contractor Ziyang County the water. Traffic Department (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water. In construction ( I) for the rest ofthe inhabitants at night, machinery with big noise should be Noise issue stage stopped working from 22:00 P.M. at night to 6:00 A.M. the next morning. Ziyang County (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters of the inhabitants, contractor Traffic Department and at least 200m away from the Shimenhigh school and the Hongyan primary school. Envmri- In design stage Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up nrta- Shaaxi Provincial necessary passage ways and replace them with those in water n-itunit Highway Bureau Designunit In construction On-job posts are put up for the traffic safety of the pedestrians at the construction section. To reduce the probability of Ziyang County stage accidents, effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages are contractor Traffic Department Social cleared away in time. economy It is necessary to issue measures against the transportation accidents of dangerous items, and Ziyang Set up a team to meet an emergency by the concerning departments ofLangao County County In opeaEnvironment Protection so as to take immediate actions. Envrion- In operation ment Ziyang County stage Protection Traffic Department Depart- ment Traffic In operation The falling rocks from the side slope should be done with in time to avoid accidents from happening. Main- Ziyang County safety stage tenance Traffic Department section In construction The earths from the foundation excavation should be done with in time when in County Solid waste construction, no dumping of them into rivers or thrown away at the beach. After completion, Ziyang pollution stage the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up and carried away outside in Traffic Department time. In construction Dust protection of the surrounding road sections should be well made, water should be sprayed at the materials stocks, Ziyang County pollution stage the sites of construction materials carriage and the construction contractor Traffic Department sites regularly to avoid dust pollution. 112 EIA and EP Execution Frame ofLRIP 5 Frameworkof Execution ProgramofEnvironnment Protection Table 5-25 (Ziyang County) Environment protection action plan program of Quanhe highway Project introduction: its start point joins a farm and ends at Qingfengdian, whose route is 39km long, which is newly built and 5km in whole length. The cubic meters of earthworks and rocks at road base of the project are I m3 in ten thousand. Engineering feature: the route goes through the area ofhuge mountainous ranges with less occupation of farmlands and waterfields. There are 10 culverts. 1mplernrion Insitution indarge ThediefexdDing The environmental protection measures to be adopted and its explementation stage insitution eivriarnrt issue (I ) adopt kinds oftechniques to keep slopes stable and avoid land erosion Envioi- Shaaxi Provincial In designsta (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. menta- Highway Bureau In design stage mzntunit . ~~~~~~~~~~~~~~~~~~~~~~~~~~ (I) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) parts of the sections are needed to be cut straight, and the mountains abound in biological resources , so it is important to Ecological In construction keep the local ecology in good order. Ziyang County environment I sta (3 ) get earths collectively and take measures of water and soil preservation, then level Trafffic Department issue off the ground and cover it with greenage. In the process of the construction, well balance the earths acquisition and dumping, pile the earths at fixed places, then level off the ground and cover it with greenage. The dumping sites should be protected well and in time to avoid huge land erosion. (4) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. In operation The highway maintenance units should take up the task of ecology protection ofthe highways along the route, which is carried Main- Ziyang County Traffic Department stage out to each specific section and appoint fixed staff to take charge. tenance ~~~~~~~~~~~~~~~~~~ stage ~~~~~~~~ __ _ _ _ _ _ _ _ _ Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by the Envion- In design stage brushing off of the side slope. menta Shaaxi Provincial itmetunit Highway Bureau Deilurit water (I ) because the highway is built along the river, the living water pollution and rubbish in the management quarters are pollution In collectively disposed of without direct drainage into the water. contractor Ziyang County construction (2) keep guard against the machinery oil leakage and the dumping into the water, reinforce environmental management, launch Traffic Department stage instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of the water (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water In construction ( I) for the rest of the inhabitants at night, machinery with big noise should be Ziyang County contractor Traffic Department Noise issue stage stopped working from 22:00 P.M. at night to 6:00A.M. the next morning. (2 ) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters of tie inhabitants. 113 ElIA and EP Execution Frame ofLRIP 5 Framework ofExecution ProgramofEnvironment Protection In designst Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up necessary n tas- Shaaxi Provincial X ~~~~~~~~In design stage passage ways and replace them with those in water. ntunk Highway Bureau Designun n On-job posts are put up for the traffic safetyofthe pedestrians at the construction section. To reducethe probability of accidents, contractor Ziyang County effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages are cleared away in Traffic Department Social stage time. Ziyang Ziyang County economy It is necessary to issue measures against thetransportation accidents of dangerous items, and Set up a team to meet an emergency by the concerning departments of Langao County County Traffic Department In opra Environment Protection so as to take immediate actions. Envrion- ment stage ~~~~~~~~~~~~~~~~~~~~~~~~~~ Depart- ment Trafi IThe falling rocks from the side slope should be done with in time to avoid accidents from happening. Main- Ziyang County safety stage tenance Traffic Department safe114stage section 114 l~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ EIA and EP Execution Frameof LRIP 5 Frameworkof Execution ProgramofEnvironment Protection Table 5-26 (Ziyang County) Environment protection action plan program of Watan highway Project introduction: starts at Wakoutan and ends at the 3rd group ofWatan village, an item to be changed of a mileage of 5km long. The cubic meters of earthworks and rocks at road base of the project are 5500m3. Engineering features: the route is located inside Maobazheng town and winds up long mountain, an item to be changed, there Are 13 culverts. The diefoaiing The environmental protection measures to be adopted and its explementation stage lmplien 1ns iUionin caW mnvrixcnemngfion (1 ) adopt kinds oftechniques to keep slopes stable and avoid land erosion Envixti- (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. rentass- Shaaxi Provincial gmnitunit Highway Bureau Delunit (I ) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) parts of the sections are needed to be cut straight, and the mountains abound in biological resources , so it is important to keep the local ecology in good order. Ecological construction (3 ) get earths collectively and take measures of water and soil preservation, then level environment stage off the ground and cover it with greenage. In the process of the construction, well balance the earths acquisition and dumping, trt Ziyang County issue pile the earths at fixed places, then level offthe ground and cover it with greenage. The dumping sites should be protected well Traffic Department and in time to avoid huge land erosion. (4) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. (5) lands occupied by the makeshift projects should be cleared in time and handed over the local authorities for farming restoration after completion In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is carried Main- County stage out to each specific section and appoint fixed staff to take charge. tenance Traffic Department stage ~~~~~~~~~~~~~~~~~~~~~~~~ TafcDprmn Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by the Envim- In design stage brushing off ofthe side slope. menta Shaaxi Provincial n-itunit Highway Bureau water (I ) because the river is built along the river, the living water pollution and rubbish in the management quarters are collectively pollution In construction disposed of without direct drainage into the water. Incostruction (2) keep guard against the machinery oil leakage and the dumping into the water, reinforce environmental management, launch contractor Ziyang County instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of the waterc Traffic Department (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water 115 EIA and EP Execution Frame ofLRIP 5 Framework ofExecution Program ofEnvironmentProtection In construction (1 ) for the rest of the inhabitantsat night, machinery with big noise should be contractor Ziyang County Noise issue stage stopped working from 22:00 P.M. at night to 6:00 A.M. the next morning. (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters of the inhabitants. Traffic Department Envrti- mentas- Shaaxi Provincial In designst Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up necessary In design stage passage ways and replace them with those in water. mnrtunit Highway Bureau Designunit Ziyang County In construction On-job posts are put up for the traffic safety ofthe pedestrians at the constructionsection. To reduce the probability of accidents, contractor Traffic Department stagetlon effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages are cleared away in Social time. Ziyang economy It is necessary to issue measures against the transportation accidents ofdangerous items, and County Set up a team to meet an emergency by the concerning departments of Langao County Envrion- Ziyang County lIn operati'on Environment Protection so as to take immediate actions. Protection Traffic Department stage Depart- ment Main- Ziyang County Traffic In operation The falling rocks from the side slope should be done with in time to avoid accidents from happening. tenance Traffic Department safety stage The earths from the foundation excavation should be done with in time when in Solid waste In construction construction, no dumping of them into rivers or thrown away at the beach.After completion, in time. contractor Traffic Department pollution stage the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up and carried away outside Especially, after bridge construction completion, clear away the pilings and level off in time so as to let the vegetation on the river bank to restore as naturally and quickly as possible. materials stocks, the sites Ziyang County Dust In construction road sections should be well made, water should be sprayed at the contractor Traffic Department pollustin stage Dust protection of the surroundingand of construction materials carriage the construction pollution sites regularly to avoid dust pollution. 116 EIA and EP Execution Frame of LRIP 5 FrameworkofExecution ProgramofEnvironment Protection Table 5-27 (Ziyang County) Environment protection action plan program of Nazhu highway Pro ject introduction: its start point joins th bridge end of Xiegou bridge of the Huancheng road and ends at the rd group 3 Of Lazhu village, a newly-built item of4 km. mileage whose road base width is 4.5m. and road surface width is 3.5m.. The investment in plan is Y41.6yuan in ten thousand. Engineering feature: the route goes through a mining area, it occupies less farmlands and woodlands. There is no bad geology Tcdhiefeoaing The environmental protection measures to be adopted and its explementation stage lrnplein Ins6ution indiage enivrinarn mirCAmto issue (I ) adopt kinds oftechniques to keep slopes stable and avoid land erosion Enviiun- In.desinstag (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. entas Shaaxi Provincial In design stage mentunit Highway Bureau Deigiunit (I ) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) parts of the sections are needed to be cut straight, and the mountains abound in biological resources , so it is important to keep the local ecology in good order. Ecological I . (3 ) get earths collectively and take measures of water and soil preservation, then level environment stage off the ground and cover it with greenage. In the process of the construction, well balance the earths acquisition and dumping, contractor Ziyang County issue pile the earths at fixed places, then level off the ground and cover it with greenage. The dumping sites should be protected well Traffic Department and in time to avoid huge land erosion. (4) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. (5) lands occupied by the makeshift projects should be cleared in time and handed over the local authorities for farming restoration after completion In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is carried Main- Ziyang County stage out to each specific section and appoint fixed staff to take charge. tenance Traffic Department section Dprmn Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by the Envorii- In design stage brushing off ofthe side slope. rentass Shaaxi Provincial mnntunit Highway Bureau water (I ) because the highway is built along the river, the living water pollution and rubbish in the management quarters are pollution In construction collectively disposed of without direct drainage into the water In costagetn (2 ) keep guard against the machinery oil leakage and the dumpirg into the water, reinforce environmental management, launch Ziyang County einstruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of the water. Traffic Department (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water 117 EIA and EP Execution Frame of LRIP 5 Framework of Execution Program ofEnvironment Protection To be continued Table 5-27 (Ziyang County) Environment protection action plan program of Nazhu highway Thediefedxsing The environmental protection measures to be adopted and its explementation stage Implion lnsitionindca irlstill" | ~~~~~envfiorenn issue Inconstruction (I ) for the rest of the inhabitants at night, machinery with big noise should be Ziyang County Noise issue stage stopped working from 22:00 P.M. at night to 6:00 A.M. the next morning. contractor Zic Count (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters ofthe inhabitants. Fnvict In designstaTake into full consideration of the impacts of the road to be changed upon safe passage inthe duration and build up necessary nitas- Shaaxi Provincial passage ways and replace them with those inwater mnitunit Highway Bureau Desgnunit In construction On-job posts are put up for the traffic safety of the pedestrians at the construction section. To reduce the probability of accidents, Ziyang County stage effective safety and warning measures are taken in doing explosive work. The earth pilings inthe passages are cleared away in contractor Traffic Department Social time. economy It is necessary to issue measures against the transportation accidents of dangerous items, and Ziyang Set up a team to meet an emergency by the concerning departments ofLangao County County In operation Environment Protection so as to take immediate actions. Envrion- Ziyang County stage Protection Traffic Department Depart- ment Traffic In operation The falling rocks from the side slope should be done with in time to avoid accidents from happening. Main- Ziyang County tenance Traffic Department safety stage _ section The earths from the foundation excavation should be done with in time when in In construction construction, no dumping of them into rivers or thrown away at the beach.After completion, pollution stage the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up and carried away outside intime. contractor Traffic Department Especially, after bridge construction completion, clear away the pilings and level off in time so as to let the vegetation on the river bank to restore as naturally and quickly as possible. Inconstruction Dust protection ofthe surrounding road sections should be well made, water should be sprayed at the materials stocks, the sites Ziyang County Dust stage of construction materials carriage and the construction contractor Traffic Department pollution sites regularly to avoid dust pollution. 118 EIA and EPExecution Frame of LRIP 5 Framework ofExecution ProgramofEnvironment Protection Table 5-28 (Ziyang County) Environment protection action plan program of Chenhai highway Project introduction: it starts at the Heifu temple and ends at the nd group of Ganshacun village, 2 an item to be changed, with a mileage of 3km. after the completion the road base width will be 4.5m, road surface width will be 3.5 m.. the cubic meters of earthworks and rocks at road base ofthe project are 4000 m3 paved with gravels. Engineering feature: the route goes through the area of huge mountainous ranges, along which there are mostly bare mountains, Barren slopes, the project needs less farmlands and woodlands. An item to be changed with 8 culverts. Thechiefewing The environmental protection measures to be adopted and its explementation stage noTp 1Iin Instiuonin dan einvrimtn inmiution issue I) adopt kinds of techniques to keep slopes stable and avoid land erosion EnvIron- (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. menta- Shaaxi Provincial In design stage nmntunit Highway Bureau Dsunit (I) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so as to reduce as much damage to the vegetation along the route as possible. (2) parts of the sections are newly built, and the mountains abound in biological resources, so it is important to keep the local ecology in good order Ecological . (3 ) In the process of the construction, well balance the earths acquisition and dumping, pile the earths at fixed places, then level environment In construction off the ground and cover it with greenage. The dumping sites should be protected well and in time to avoid huge land erosion. trt Ziyang County issues stage (4) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to Traffic Department vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating in depth. (5) lands occupied by the makeshift projects should be cleared in time and handed over the local authorities for farming restoration after completion In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is carried Main- Ziyang County stage out to each specific section and appoint fixed staff to take charge. tenance Traffic Department section Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by the Enxvii,- In design stage brushing off of the side slope. mentas Shaaxi Provincial Inntunit Highway Bureau Dsgunit water (I ) because the highway is along the river, the living water pollution and rubbish in the management quarters are collectively pollution In construction disposed of without direct drainage into the water. In costagetln (2) keep guard against the machinery oil leakage and the dumpirg into the water, reinforce environmental management, launch contractor Ziyang County instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of the water. Traffic Department (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing ard washing into the water. 119 5 Framework ofExecution Progranm ofEnvironmentProtection EIA and EP Execution Frame ofLRIP Ziyang County In construction (I ) for the rest of theinhabitants at night, machinery with big noise should be contractor Noise issue stage stopped working from 22:00 P.M. at night to 6:00 A.M. the next moming. inhabitants. Traffc Department (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters of the ~~~~~~~~~~~~~~~~~~~~~~~~~ _ _ _ safe passage in the duration and build up necessary mentaR Shaaxi Provincial In design stage Take into full consideration of the impacts of the road to be changed upon mntunit Highway Bureau passage ways and replace them with those in water Designunit In On-job posts are put up for the traffic safety ofthe pedestrians at the construction section. To reduce the probability ofaccidents, The earth pilings in the passages are cleared away in Ziyang County construction effective safety and warning measures are taken in doing explosive work. conc Traffic Department Socialstage time, Socialstg tie accidents of dangerous items, and Ziyang economy It is necessary to issue measures against the transportation County Set up a team to meet an emergency by the concerning departments ofZiyang County Envrion- Environment Protection so as to take immediate actions. Ziyang County In operation Protection Traffic Department stage Depart- ment Main- Ziyang County TTraffic In operation The falling rocks from the side slope should be done with in time to avoid accidents from happening. tenance Traffic Depaoment safety stage ~~~~~~~~~~~~~~~~~~~~~~~~ _____________ In The earths from the foundation excavation should be done with in time when in completion, Ziyang County construction construction, no dumping ofthem into rivers or thrown away at the beach.After away outside in time. contractor Traffic Department pollution stage the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up and carried the Especially, after bridge construction completion, clear away the pilings and level off in time so as to let the vegetation on river bank to restore as naturally and quickly as possible. sites In Dust protection of the surrounding road sections should be well made, water should be sprayed at the materials stocks, the contractor Ziyang County Dust construction of construction materials carriage and the construction Traffic Department pollution stage sites regularly to avoid dust pollution. 120 EIA and EP Execution Frame ofLRIP 5 Framework ofExecution ProgramofEnvironment Protection Table 5-29 (Ziyang County) Environment protection action plan program of Qingyan highway Project introduction: it starts at the entrance rod leading to the Maliu railway station and ends at the thgroup ofQingyancun 4 village. It is a newly- buit item whose mileage is 5.5 km. the cubic meters of earthworks and rocks at road base of the project are 3m3 in ten thousand, a village road. Engineering feature: the route goes through the area of huge mountainous ranges and needs less farmlands and plowlands, there Is no bad geol gy The dciefedAing The environmental protection measures to be adopted and its explementation stage Impl?nmic Inninim indiarge envrvn issue insutiion ( I ) adopt kinds of techniques to keep slopes stable and avoid land erosion (2) protect the existing slopes vegetation, for the bare ones plant greens based mainly on the local species. Ei F Shaaxi In design stage (3 ) in consultation with local land management departments to make good plans of the sites of land acquisition and the mertunt Provincial removal of it. . Highway Bureau Desgnunit ( I) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so Ziyang County as to reduce as much damage to the vegetation along the route as possible. Traffic (2) In the process of construction, pile the dumping earthwork in fixed place and protect the sites in time and necessarily Department so as to avoid huge water and land erosion. Ecological (3 ) for the route along rivers, build ward-off projects to keep earthwork and cubic meters of rocks from dropping into the environment In rivers along the route, and after the completion of the construction, seeds of the local vegetation are sown along the side issue construction slopes and the river banks. For the surplus cubic meters of rocks in construction can be filled in the ditches and trenches stage along the route and then covered with soil to restore farming. contractor (4) strictly control the log numbers to be cut down, forbid to get rocks, gravels and earths in the woods. (5 ) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. when in construction of road foundation at the section at the places where the animals haunt, road obstacles are put up to keep the animals from falling when cutting from high and excavating in depth. (6) lands occupied by the makeshift projects should be cleared in time and handed over the local authorities for farming restoration after completion. In operation The highway maintenance units should take up the task of ecology protection of the highways along the route, which is Main- Ziyang County stage carried out to each specific section and appoint fixed staff to take charge. tenance section Traffic Protection in design ofthe road sections along the riverside is well made so as to avoid impacts on the water quality by the Envmi- Shaaxi water brushing off of the side slope. n ta In design stage pollution polto men-tunt.ProvincialHighway Bureau D12gn1un 121 EIA and EP Execution Frameof LRIP 5 Frameworkof Execution Programof EnvironmentProtection ( I ) because the highway is built along the river, the living water pollution and rubbish in the management quarters are Ziyang County collectively disposed of without direct drainage into the water. Traffic In construction (2) keep guard against the machinery oil leakage and the dumping into the water, reinforce environmental management, Department stage launch instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution ofthe contractor water. (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they ! should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water In construction ( I ) for the rest of the inhabitants at night, machinery with big noise should be Ziyang County Noise issue stage stopped working from 22:00 P.M. at night to 6:00 A.M. the next moring. contractor Traffic (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters of the inhabitants. Department Envii- Ziyang County Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up mertasss Traffic In design stage necessary passage ways and replace them with those in water mentunit Department Desgrunit On-job posts are put up for the traffic safety of the pedestrians at the construction section. To reduce the probability of Ziyang County Social In construction accidents, effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages are Contractor Traffic economy stage cleared away in time. Department It is necessary to issue measures against the transportation accidents of dangerous items, and Ziyang County Ziyang County Set up a team to meet an emergency by the concerning departments of Hanbing District Envrion- Traffic In operation Environment Protection so as to take immediate actions. ment Protection Department stage Depart- ment In operation The falling rocks from the side slope should be done with in time to avoid accidents from happening. Main- Ziyang County Trafffic safety stage tenancesection Traffic stage tenance section Dprmn ____ ___ ____ ___ Department I The earths from the foundation excavation should be done with in time when in Ziyang County Solid waste construction, no dumping ofthem into rivers or thrown away at the beach. After completion, Traffic pollution stage the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up and carried away outside in contractor Department time. Dust In construction Dust protection ofthe surrounding road sections should be well made, water should be sprayed at the materials stocks, the Ziyang County stage sites of construction materials carriage and the construction contractor Traffic pollution sites regularly to avoid dust pollution. Department 122 EIA and EP Execution Frame ofLRIP 5 Frameworkof Execution Program ofEnvironment Protection Table 5-30 (Ziyang County) Environment protection action plan program of Zhaowan highway Project introduction: starts at the Chaoyangcun village and ends at the Wanxingcun village, an item to be changed of all together 11.5 km. the cubic meters of earthworks and rocks at road base of the project are l.im3 in ten thousand, a village road. Engineering feature: the route goes through the area ofmountainous ranges and ditch valley areas with the ground surface rolling Greatly, an item to be changed, there are 23 culverts. Thechiefoasting The environmental protection measures to be adopted and its explementation stage 1n*lnrtion Instittioninduar cnvnot)errn irion issue ( I ) adopt kinds of techniques to keep slopes stable and avoid land erosion Shaaxi Provincial In design stage (2) protect the existing slopes vegetation, for the bare ones plant greens EMD Highway Bureau based mainly on the local species. (1) reasonably arrange construction sequence, sectional construction and choice of advanced construction techniques so Ziyang County as to reduce as much damage to the vegetation along the route as possible. Traffic Department (2) in consultation with the local management departments to make good plans of the land acquisition and dumping sites. In the process of construction, balance the removal and dump possibly, pile the dumping earthwork in fixed place and protect the sites in time and necessarily so as to avoid huge water and land erosion. (3 ) for the route along rivers, build ward-off projects to keep earthwork and cubic meters of rocks from dropping into Ecological In constructior the rivers along the route, and after the completion of the construction, seeds of the local vegetation are sown along the environment side slopes and the river banks. For the surplus cubic meters of rocks in construction can be filled in the ditches and contractor issue stage trenches along the route and then covered with soil to restore farming. (4) strictly control the log numbers to be cut down, forbid to get rocks, gravels and earths in the woods. (5 ) give instructions to the construction staff to protect the wild animals and plants, prevent against arbitrary damage to vegetation and hunting for wild animals, protect the ecology along the route. (6) lands occupied by the makeshift projects should be cleared in time and handed over the local authorities for farming restoration after completion. Ioprto The highway maintenance units should take up the task of ecology protection of the highways along the route, which is Main- Ziyang County noperaton carried out to each specific section and appoint fixed staffto take charge. tenance Traffic Department stage section water Protection in design of the road sections along the riverside is well made so as to avoid impacts on the water quality by Shaaxi Provincial pollution In design stage the brushing off ofthe side slope. Highway Bureau 123 EIA and EP Execution Frameof LRIP 5 Frameworkof Execution Programof EnvironmentProtection (I ) because the highway is built along the river, the living water pollution and rubbish in the management quarters are Ziyang County collectively disposed of without direct drainage into the water. Traffic Department construction (2) keep guard against the machinery oil leakage and the dumping into the water, reinforce environmental management, Inage launch instruction campaign. Repair the vehicles, transports and boats in construction regularly to prevent pollution of stage th ae.contractor the water. (3 ) construction materials like bitumen, oil and chemicals can not be piled up near drinking wells and river water, they should be kept far away and covered with canvas to prevent wind and rainstorm from blowing and washing into the water. In construction ( I ) for the rest of the inhabitants at night, machinery with big noise should be Ziyang County Noise issue stage stopped working from 22:00 P.M. at night to 6:00 A.M. the next morning. contractor Traffic Department (2) machinery and the mixer used fixedly should be kept at sites 150m away from the living quarters of the inhabitants. Thechiefae.ing The environmental protection measures to be adopted and its explementation stage lriorplcn Irisnincdhge envnarhyM institution Take into full consideration of the impacts of the road to be changed upon safe passage in the duration and build up Ziyang County In design stage necessary passage ways and replace them with those in water END Traffic Department Put up necessary trafffic signs along the route. In construction On-job posts are put up for the traffic safety of the pedestrians at the construction section. To reduce the probability of Ziyang County Social stage accidents, effective safety and warning measures are taken in doing explosive work. The earth pilings in the passages are contractor Traffic Department economy cleared away in time. It is necessary to issue measures against the transportation accidents of dangerous items, and Z Ziyang County In operation Set up a team to meet an emergency by the concerning departments of Langao County Ciyang Traffic Department stage Environment Protection so as to take immediate actions. EPD The falling rocks from the side slope should be done with in time to avoid accidents from happening. Main- Ziyang County Traffic In operation tenance Traffic Department safety stage section The earths from the foundation excavation should be done with in time when in Ziyang County Solid waste In construction construction, no dumping ofthem into rivers or thrown away at the beach.After completion, Traffic Department l Solid waste In construction the consruction wastes, old devices, packages and rubbishes are to be collectively sealed up and carried away outside in contractor pollution stage time. Especially, after bridge construction completion, clear away the pilings and level off in time so as to let the vegetation on the river bank to restore as naturally and quickly as possible.. Dust In Dust protection of the surrounding road sections should be well made, water should be sprayed at the materials stocks, contractor Ziyang County pollution construction the sites ofconstruction materials carriage and the construction Traffic Department stage sites regularly to avoid dust pollution. 124 EIA and EPExecution Frame ofLRIP Appendixs Appendix 1: Standard Implemented in Project l. Quality standard of water environment Quality appraisal standard of water environment "Standards of environmental quality of Ground water" (GB3838-2002) Item SS PH Hypermanganate petroleum NH3-N Category \ index< N - Class I standard 150 6-9 2 0.05 0.15 Class 11 standard 6_ 9 4 0.05 0.5 Class III standard 6-9 6 0.05 1.0 Remark GB5084-92 (GB3838-2002) Note: unit is in mg/L, except pH. Integrate Sewage discharging standard (GB8978-1996) (extracted) Unit: mg/l Series Contamination Class I Class II Class IIl I SS 70 150 400 2 CODcr 100 150 500 3 BOD5 20 30 300 4 NH -N 3 15 25 _ 5 Petroleum 5 10 20 6 Propagation oil 10 15 100 Farm land irrigation water quality standard (extracted) Unit: mg/L Series Item Crop sort Rice field Dry land Vegetable I Biochemical oxygen S 80 150 80 demand (BOD5) 2 Chemical oxygen < 200 300 150 demand (CODcr) 3 Suspension 150 200 100 4 Nitrogen S 12 30 30 5 Total phosphorus (P) S 5.0 10 10 6 Petroleum _ 1.0 _ 5.0 10 7 Coliform population, 10000 __ __ _ each/L__ _ _ _ _ _ _ __ _ _ _ _ _ __ Note: Class 1: rice, watering quantity 800m 3Mu * year Class 11: dry-land, wheat, corn, cotton. Watering quantity 300m3/Mu year. Class 111: vegetable, cabbage, leek, onion, Chinese cabbage, etc. 125 EIA and EP Execution Frame ofLRIP Appendixs 2. Atmosphere quality standards Environmental atmosphere quality standards (GB 3095-1996) (Extracted) Contamination Class II concentration limit ( ) (mg/m3) Remark Daily average Ihour concentration concentration NO2 0.12 0.24 TSP 0.30 GB3096-1996 revision 3. Ambient noise standard Urban area ambient noise standards (GB3096-93) (extracted) Unit: Laeq (dB) Class Adapted scope Day Night 1 Major residential, education and administration area 55 45 2 Mixed area of residence, commerce and industry 60 50 4 Area on both sides of urban trunk lines, navigation channels 70 55 Noise limit on Construction sites (GB 12523-90) (extracted) unit: Laeq (dB) Work items Major noise resource Day Night Earth work Loader, excavator, bulldozer, roller 75 55 Pile work Various piling equipments 85 Work prohibited Structure Concrete mixer, vibrator, electrical saw 70 55 Decoration Crane, lifter 65 55 126 EIA and EP ExecuitionFrame ofLRIP Appendixs Appendix 2: Public participation on the project Minutes of rap session of Ankong-Maoba xpressway at Xiangyang town Ziyang County On 25, July 2005, a rap session was chaired by office of Xiangyang town Ziyang County at the office of Xiangyang town Ziyang County about social investigation on section of Ankong-Maoba of Arrongqi of Inner Mogular-Beihai Guangxi expressway. Participants of the session were Traffic Bureau of Ziyang County, Xiangyang town gov. office, representative from appraisal unit of Chang'an University and villagers of Xiangyang Town, totaling 17 people (namelist attached). At the session, the county traffic bureau made a general introduce of the project, and the appraisal unit introduced the possible impact on environment by the project and the measures taken on environmental protection, afterword, participants gave a warm discussion. I. General introduction of the project by traffic bureau of Ziyang County The planned length of the expressway in Shaanxi province is about 950km, the alignment of this project section starts at Yinjiaying, Wulizhen town, Ankong County, terminates at Maoba of Ziyang County, totaling 86.902 km. The alignment travels through Ziyang County, Xiangyang Town, Gaotan, Maoba. The designing standard ofthe project is of 80km/h traffic speed, 4 lanes dual carriageways, subgrade width is of 24.5m, and the standard declines at some backward area, with traffic safety secured. Interchanges are set at Hengkou, Liushui, Dahedao, Ziyang, Quanhekou and Maobar,so as to bring service function of the expressway into better play, joining the transportation of this project with existing trunk ways or other major local roads. II. Introduction of possible influence on environment by representative from appraisal group Construction of the project will take up land, reducing farm field, damaging mountain area, shrinking vegetation resources, driving away wild life and making landscape worse. Meanwhile, it may also bring conflict to very small group of minority nationalities, which have unique religion belief and living styles, apart from that, part of residents have to relocate. The construction of the project may lead to turbidity and contamination of water along the line; construction dust, atmosphere pollution; increase noise, affecting the normal life of residents, school, and hospital. When the expressway is in operation, wild animal may be forced away, water contamination dangerous index increases, noise amplifies leaving impact on local residents' living. We will take measures such as sprinkle water; suspend work at night, enhancing management on water pollution to reduce the impact to minimum, taking Yuanmingyuan as an instance to make additional remarks. III. Opinions from the participants on expressway construction l.Mr Ren, a teacher from County middle school: people have expected the expressway construction for long and will offer great support. People will accept the negative effect by the construction, there might be a very few opposing it, but, with the proper ideological work from the government, and neighbor's explanation, I think they will all accept the construction. In general, people offer their great support and warm attitude. As for me, I fully support it. 2. Ms Ma: Hui minority. Completely support road construction, as it brings benefit to people, to our offspring, no any opposition, support it! 3. Ms Xing: road construction, that's a good thing! As it benefits people, taking environmental protection measure itself has already shown it draws water to peoples' mill, besides, construction effect is only temporary. I don't have opposition, and feel happy, welcome the road construction. 4.villager: the present mountain traffic is quite inconvenient, strongly hinders the villagers' contact to outside world as well as the development of local economy. With bad traffic condition, there is less developing opportunity, thus, getting poorer. While with good road, as time expended on traffic is greatly reduced, it gets easier for local agriculture, forest and mineral resources sent out. Building road is for good ofour offspring, we will absolutely support. 5. Deputy to the People's Congress of the County: Eventually, the hope of road construction is to be realized, and we will do good work for the construction, support! 6. Villager: we have been looking forward to the highway for long time. Building good highway to develop local economy and better people's living condition, thanks for such a careful work from up level. Supporting. 127 EIA and EP Execution Frame oJ LRIP Appendixs 7.Driver: With better road, enterprise can be developed, and transportation operation will bring happiness to local people along the line, peopleuphold, and government support it. We driversare looking forward to it with happiness and eagerness. 8. The Chairman: What people said must come out of their deep, road construction will up grade the development of local economy, promoting opening up of resources. The impact is only unilateral, negative influence is much less than positive. 9. Appraisal representative: From the expressions of villagers' attitudes, we are getting more confident; we will do our work better. IV. Summery Local government and villagers have shown their great enthusiasm on the project construction, "great work in thousand years", "absolutely supporting", all of which reflect people's opinion. We must do our best in the project construction to reduce the impact to minimum. List of articipants o the rap session of AnkongShaanxi & Sichuan bound expressway 2005 7 25 Series Name Gender Age Nationality Town, village Occup./posi. Remark I Wang Male 45 Han Xiangyang Chairman, Yide Town Deuyofnpopl Zhu Xiangyang~~~~~~~~Cng 2 Dau Male 50 Han Xiangyang Villager Dagui Town 3 Ha Male 52 Hui Xiangyang Director Zhigang Town 4 Tang Male 60 Han Xiangyang Branch Party Qishan Town secretary 5 Zhu Male 50 Han Xiangyang Branch Party Meiyin Town secretary 6 Nieug Male 38 Han Xiangyang Party secretary 7 Wu Baiyi Male 50 Han Chengguan Driver Town, Ziyang 8 Cheng Male 55 Han Xiangyang Team leader Chuhua Town 9 Ren Female 52 Hui Xiangyang Villager Zhigui Town Xing Xiangyang Deputy of people 10 Shixiu Female 62 Han Town Cong. 11 Ma Jijun Female 75 Hui Xiangyang Villager 12 Li Jiahai Male 43 Han Xiangyang Director 13 Wang Male 71 Han Xiangyang Retired worker Liude Town 14 Wang Male 23 Han Urban, Ziyang Worker Traffic Peng County bureau 15 Liu Shan Female 42 Han Chang' an Uni. Associate Appraisal professor group 1_6 Liu Male 22 Han Chang'an Uni. Xiaodong Graduate student Duan 17 Yaping Female 26 Han Chang'an Uni. Graduate student 128 EIA and EPExecution Frame ofLRIP Appendixs Expressway project in Shaanxi section of Inter-provincial highway of ArongQi-Beihai, Western development Minutes of rap session of Ankong-Maoba expressway at Xiangyang town Ziyang County On 24, July 2005, a rap session among people in Liushui Town was chaired by traffic bureau of Hanbin District at the office of Liushui town Hanbin District on construction of project section of Ankong-Maoba of Arrongqi of Inner Mogular-Beihai Guangxi expressway. Participants of the session were Traffic Bureau of Hanbin District, Liushui town Gov. office, representative from appraisal unit of Chang'an University, Hongshan Town Gov. and villagers from Hongshan Town, totaling 24 people (name list attached). At the session, the appraisal unit introduced the possible impact on environment by the project and Liushui Town made a general introduce of the local situation to appraisal group from Chang'an University. Minuters are as the follows I. General introduction of the project The expressway of Ankong-Maoba starts at Yinjiaying, Wulizhen town, crossing Yuehe river, then goes into king length Fenghuangshan tunnel to Qiligou toward south, passing Liushui, Linhe, Dahedao. The alignment plans for tunnels at Caishenmiao and Zhangjiawan; through interchange at Ziyang then, travels along Gaotan, to Maoba. The total length is 86.902km, the designing standard of the project is of 80km/h traffic speed, 4 lanes dual carriageways, subgrade width is of 24.5m, and the standard declines at some backward area, with traffic safety secured. The project takes up land of 1977 Mu. among which rice land 312 Mu, slop land 545 mu, orchards 56mu, house land 76mu. demolition and relocation 22100m3 of houses. Interchanges are set at Hengkou, Liushui, Dahedao, Ziyang, Quanhekou and Maobar,so as to bring service function of the expressway into better play, joining the transportation of this project with existing trunk ways or other major local roads. II. Major influence on residents from expressway construction I.Construction of the project will take up farmland, forestland and house land, involving demolition of buildings and relocation. 2.Construction noise and traffic operation will bring disbenefit effect on adjacent villages and schools. 3.Construction dust, asphalt placement and emission of traffic will bring disbenefit effect on adjacent villages and schools. III. Basic status of Liushui Town Liushui Town locates in southwest ofHanbin District, total area is 86kmi,among which, 2 water area is 36 km2. Town population is 16000, 12000 of which are farmers and non-farm population is 4000. average income is 1750yuan/person. Tourist resource is abundant; forest coverage is up to 60%. Typical farm products are orange, chestnut, silkworm, freshwater whitebait, coal, slabstone and limestone. IV. Attitude to expressway project l. Local government actively support the expressway construction, believing the project will bring along the development of local transportation, energy, communication, sanitation and education. They showed their willingness of working with relevant departments for land acquisition, relocation and demolition work. 2. People along the line generally believe that the project will improve their living environment and 129 EIA and EP Execution Framne of LRIP Appendixs upgrade life quality, it has significance to both the state and local area, hoping the road to be open to traffic earlier the better so to bring along the economic development of the area which is of their lone-cherished wish. 3. To the land acquisition and relocation issue, everyone shows that highway construction is a major state issue, they will give their support, besides, the state has the relevant policy for acquisition and relocation, and if the police is fully complied with, they will not have objection. Some others even expressed that the present road status can even be improved at the cost of part of their land and cultivations. Meanwhile, the local government also indicates the possibility of readjusting land distribution. V. Suggestions on expressway construction 1. Compensation on land acquisition and relocation: economical compensation for land acquisition shall comply with the relevant state policy to maintain the farmers interests. Enhance the propaganda on state economical compensation policy to lessen people's uncertainty. 2. Relocation shall be done on immediate and reasonable basis. inquiring about people's wish for relocation and to sign the agreement with local government, allocate properly for securing that the relocated people not have economical loss. 3. For the short-term environmental effect due to construction, people have expressed their understandings. VI. Conclusion Local government and People along the line actively supports the expressway construction, and hopes that construction of the project will bring along the development of local economy and culture, help the area to cast off poverty and become better off, believing that with the state's relevant policy for acquisition and relocation, allocation issue can be dealt with in accordance with state policy. Minute taken by: Gui Haoyao 23, 7 2005 List of participants to the rap session at Liushui Town of Ankong-Shaanxi & Sichuan bound expressway 2005 7 25 Series Name Working unit (town, village) Position Remark I Liu huaixing Traffic bureau of Hanbin Dist. Section director 2 Li Shanhai Luishui Town Government Deputy director 3 Li Chenghui Hongshang Town Traffic Office Director 4 Shan Linyuan Qilichun village, Liushui Town Accountant 5 Tang Dide Forest Station, Liushui Town Director 6 Ma Shihai Liushui town traffic office Director 7 Liu Heming Liushui town Govn. Office Staff 8 Xu Yinglong Liushui Town Villager 9 Wang Renzhi Liushui Town Villager 10 Tang Dengchuan Yugongchun Villager 11 Li Jinchun Yugongchun Villager 12 Li guang ren Yugongchun Villager 13 Fang Mingging Yugongchun Deputy party Sec. 14 Tang Dijie Yugongchun Representative 15 Zhou Kaiyong Street Representative 16 Zheng Longyong Street Representative 17 Yan Bangan Xuefangya Representative 18 Shan Linzhi Street Branch Party sec. 130 EIA and EP Execution Frame ofLRIP Appendixs 19 Li Chengguang Tianxinchun Branch Party sec. 20 Li Jun Tian Xincun Village leader 21 Yuan Chunxue Chang'an University 22 Liu Liguo Chang'an University 23 Yao Gang Chang'an University 24 Gui Haoyao Chang'an University Table of opinion poll on the project The environmental appraisal group from Chang'an University made a wide scope of social investigation and opinion poll on the project from Hanbin District Ankong City, Langao County, and Ziyang County in August 2005. Appraisal group gave out, along the alignment, large amount of table of opinion poll on the planed construction project items in the first year to collectthe opinion and suggestion from the local people, making 200 interviews and consultation with the table filled. Resultof opinion poll is shown in the following table. The result of opinion poll shows that people along the alignment have great enthusiasm on renewing or building rural road, hoping highway to be open to traffic earlier the better. The mentioned requirements on relocation and compensation in the opinion poll have been mostly settled in the designing stage of the project. To the upcoming issues relating with land acquisition, building demolition and relocation during the construction stage, building department will have them fulfilled in accordance with various administration levels, cooperated with ideology work so as to reduce the unfavorable impact to minimums. Public opinion on rural road of Ankong highway development project (2005, 8) Types Project Times Rate Yes 192 Agree to the highway project 96.50% or No not agree No idea 7 3.50% Agree ~~175 Agree to the alignment 87.90% or not Agree Not agree 3 1.50% agree No idea 21 10.60% Benefit 193 97.00% Highway construction benefit Not benefit I 0.50% local economy development or No influence not 3 1.50% No idea 2 1.00% Asphalt road 28 14.10% Macadam road 36 18.10% Road status of your village Earth road 96 48.20% Minor road 34 17.10% Navigation 5 2.50% Highway taking up part of farm No 156 78.40% land, building demolition and Yes 18 9.10% relocation. Your opinion on this 25 12.50% issue No idea Obey or disobey land acquisition Obey 136 68.30% 131 EIA andEP ExecuitionFrameofLRIP Appendixs and relocation Conditional obey 61 30.70% Disobey 2 1.00% Know or unknow the policy of Know 44 22.10% highway land acquisition and Partly know 47 23.60% relocation Unknow 108 54.30% Economy compensation 114 57.30% Employment compensation 65 32.70% Demand on compensation Profession change 13 6.50% Others 7 3.50% Satisfied 116 58.30% Satisfied or unsatisfied to Partly satisfied 54 27.10% present environmental quality Unsatisfied 23 11.60% No idea 6 3.00% Public opinion on ruralroad of Ankong highway development project (2005, 8) Type Item Number Rate Machine noise 58 29.10% Environmental fact impacted most _ Construction dust 62 31.20% seriously on you by highway Traffic problem 59_29_60 _ construction 5 Others 20 10.10% Traffic noise 65 32.70% Environmental fact impacted most Emission by vehicle 36 18.10% seriously on you after the highway . open to traffic Dus 56 21.10% Others 42 21.10% Vegetation spoiled 25 12.60% Soil erosion 26 13.10 Farmn land taken up 41 20.60% Other Environmental impacts on P Water source pollution 12 6.00% ambient surrounding by highway. construction Noise pollution 36 18.10% Air pollution 30 15.10% Landscape spoil 10 5.00% Other 19 9.50% Agree 175 87.90% Agree to or disagree to taking Agree 175_87_90 _ . Disagree ~ ~0 0.00% actions on environmental protection Whateeig_ __ _ _ Whatever is good 24 12.10% Highway planting 158 79.50% Comments on other actions to lessen Noise barrier 19 9.50% the impact Relocation 5 2.50 Whatever will do 17 8.50% Appendix 3: Environmental appraisals on typical section 132 EIA andEP Execution Frame ofLRIP Appendixs Environmental appraisals on typical section 1 Principle of choosing typical highway and status analysis Based on the interspacing distribution of 108 rural roads (covering three districts and county), road class (provincial, county, town and village), construction period, construction characters (newly, rebuilt) and landform, zoological sensitivity and work quantity, the following standards are set up: (1) choosing high class road; (g) choosing road work about to be started; ) choosing road with complicated landform; ( choosing road with more zoological sensitivities; ( choosing road with large work quantity; ( synthetically considering distribution status of road network in the 1-district-and-tow-counties, and choosing representational road in the area. We put our emphases on choosing 6 rural road in our environmental appraisal (Hongniu road, Huqian highway, Landa highway, Tiemiao highway, Yuzi highway and Gunsan highway), with relevant environmental protection measure proposed. The present road status of the 6 is shown in table I - 1. Table 1-1 Present road status of typical section District or Series Project Mileage speed Road Pavement width Construction Typical county term (km) (km/h) class status (m) character nature attached (mh I 1 Huqian 45 18 Out Bad 3.5 Rebuilt County Hanbin highway class unpaved class road district Hongniu 30 20 Out Bad 3 Rebuilt County road class unpaved road 30 Landa 58 18 Out Bad 3 Rebuilt County Langao highway class unpaved class road county 33 Tiemiao 15 20 Out Bad 3 Rebuilt Town highway class unpaved class road Fine, Provincial Yuzi Class paved, ~~~~~~~~~~~~~cla 48 Yuzi 74.5 20 Class paved, 5 Rebuilt road, with highway 4 partial many Ziyang gravel villages county County 48 Gunsan Out Badcls higway 48 highway 15.612 10 cls npvdRebuilt 15.612 road, highi 10 clatss unpaved imountain _________ _ _ _ _ _______ _ _ _ _ _ __________ _____________ steep slop 2 Environmental appraisal on typical rural highway impact 2.1 Environmental appraisal on Huqian highway 2.1.1 Project character and introduction Huqian highway lies on south of Hanbin district, starting at Yinhu dock special highway at KO+500, stopping at Songliu highway at K26+050, the overall line of 45km is to be rebuilt. The line will be rebuilt 133 EIA andEP Execution Frame of LRIP Appendixs into hilly mountain terrain class IV dual carriageway. Soil work for Subgrade is 82000 m3, for county class road. Construction material such as steel, cement and asphalt can be purchased in Ankong city, stone, gravel can be purchased at quarries. Commencement in March, 2006, completion in Dec. 2009. Project investment is 20.25 million. 2.1.2 environment introduction and character (I) Environment The alignment lies in hilly mountain area, on northern bank of Yinhu lake. Various valise such as Liushuihe river, Yijiahe river and Qiligou are in the north side. Coverage of vegetation is high, major vegetations are evergreen broad leave forest and evergreen deciduous broad-leave forest. Human activity is frequent, animals are farm-dwellings, wild animal is rare. No zoology protection item. Typical vegetations and landscape of Yinhu lake along the alignment are shown in the following pictures: Typical vegetations in project area Typical vegetations in project area Existing road in KuQian and Yinhu lake landscape Existing road in KuQian and Yinhu lake landscape (2) Water environment The major water environmental protection item in Kuqian highway is the Yinhu lake. Water quality monitor result of the lake is as following Table 2-1, from the data, environmental water quality of the lake is quite good. Table 2-1 Monitoring result of river Unit: mg/L Monitor - Monitored factor Water tor Permanganate S oil NHN pH Remark index Section at 2005.06 3.3 5.0 Not 0.494 7.10 Lower reaches of Qiligou mouth tested proposed project 134 EIA and EP Execution Frame ofLRIP Appendixs (3 ) acousticalenvironment one noise sensitive environment is taken, the village acoustical environment value is shown in table 2-2, result shows that acoustical environment is excellent. Table 2-2 environmental noise monitoring value along Kuqian highway village (Laeq) Name Monitor content Tested value Remark Shuiliu Town Day time noise (dB) 43.3 Natural noise (4) atmosphere environment Atmospheric environment along the highway can be refered to data taken from 12, May 05- 15, May at Yugong village, Liushui Town. nitrogen dioxide of total suspended particulate matter is shown in table 2-3. Quality of atmospheric environment in the proposed project area is excellent. (5) Major sensitive point Yinhu lake, Yinhu Town, Liushui Town Table 2-3 Monitored result of air pollution content along highway project Unit: mg/rn3 Thickness in I hour Daily average thickness Item Exceeding First Second Third Fourth Fifth Thickness Exceeding Thickness range rate ( %) day day day day day range rate (%) N02 0.003-0.006 0 0.0057 0.0055 0.0045 0.0038 0.0028 0.0028- 0 _ ____ _ __ _ _ ____ _ __ _ _ _ ______ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 0.00 57 TSP 0.011-0.106 0 0.059 0.056 0.077 0.056 0.105 0.056- 0 __ __ ___ _ _ _ _ _ _ 1___ _ _ _ _ _ _ _ _ _ 1__ _ _ _ _ _ 1__ _ 1__ 0.105 _ _ _ _ _ _ 2.1.3 Major environmental impact and reducing measures (I ) environmental impact and reducing measures The land acquired by the highway is mainly of natural vegetation, while farmland is not much, forest land is mainly of shrub, arborvitae, chestnut. The project is of rebuilt one, which is to be widen on the origin subgrade. Therefore, the impact on plantation, animal is quite less. Releasing methods: (Das there is Yinhu lake swamp on highway side, dumping pits shall be planned farther away; Dumping pits shall strictly comply with the specification and approval procedures. Blocking dam shall be set at lower stream of dumping pits for collecting the waste with enhancing of water drain, planting as to reduce waste dumping to less impact on the swamp. © the 20cm surface soil from the acquired farm land shall be stored separately for the use on newly cultivated land, lower quality farm land or other farm soil improvement. (® temporary land shall be graded and planted as soon as possible for restoration of cultivation. (2) acoustical environmental impact and reducing methods Villages along the line are dense and population is large. The project covers 50 villages, thus, noise pollution in the construction period is quite serious. Relief method: (X) construction units must use equipment and vehicles satisfying relevant standards, the less noisy the better. Vibration bearing sets shall be fixed on those with greater vibrating equipments. © to reduce the mobile noisy sources from striking, material conveying, the contractors are required to have them reduced by applying to civilized construction manner or enhancing the effective managements. (E) material yard, mixing plant, asphalt mixing plant shall be placed at)200 m apart from sensitive points. 135 EIA andEP Executtion FrameofLRIP Appendixs ) as pavement is to be improved in traffic operation stage and volume is not much in near future (314 vehicles in 2015/day), acoustic environment impact in operation stage quite small. (3 ) water environmental impact and reducing measures The line is set on the north bank of Yinhu lake, major influence of the project on the lake is from sewage outlet from construction sites and resident sites and hazard chemical goods, which will endanger water quality of the river in traffic operation stage. Relief methods: Chose suitable construction period and sites. (®)neatly storing construction materials. Enhancing transportation management in traffic operation stage. (4) Social environmental impact and reducing measure With the road rebuilt, tourist economy in the area is deemed to be improved, which also brings some negative impact on the environment. Relief methods: Relevant local management departments shall enhance their management. (5 ) other environmental protection measures T contractors shall rent local houses as their working sites or set within the R.O.W. as many as possible, and take positive measures to reduce residential sewage or wastes against water pollution. (©)Construction units shall use the equipments and vehicles complying with the relevant state standards to ensure the emission meet the standards. Equipments shall be well maintained in good operation condition. (©)Access roads shall be set apart from sensitive points such as residential houses and schools. O Construction sites shall be set far apart from rivers systems along the line. Waste water is not allowed to be discharged directly into rivers. © Eating and washing ups of construction personnel shall be under uniformed management, such as gathered eating and washing-up, for reducing living sewage quantity. Washing scour must be under control, using hot water for replacement of wash scour or other replacing methods. (d) quarry shall strictly comply with submission and approval procedures, which is in conformity of construction standards. Purchased materials shall comply with the requirements on quality and environmental protection. 2.1.4 Public participation For the purpose of listening to suggestion and comments from various social communities, we called on rap sessions, interviewing individuals and distributing opinion polls. Investigation content includes: ( I ) inquiring about attitudes on proposed highway construction from the individuals interviewed; ( 2 ) inquiring about people's opinions on the highway alignment, demolition, relocation, compensation and land acquisition and environmental protection; (3 ) inquiring about their attitude toward the impacts on social economical development status, folk cultures. Investigation shows that the majority people think the project will improve invest environment for the area, promoting economical development, benefiting living condition and quality, it will have positive significance to both the state and the local. 2.1.5 Environmental management plan The project environmental protection management is due to Traffic bureau of Ankong city, which shall enhance environment monitor during the construction. Environment protection plan, except from variation design, land acquisition, relocation and compensation, shall be implemented by construction units 136 EIA andEP Execution Frame ofLRIP Appendixs and Engineer supervises the implementation. Environment monitor is to be executed by environmental monitoring station of Hanbin District. Major monitoring items are noise, water quality, atmosphere complying with relevant state standard. 2.1.6 Summery on appraisal The rebuilding of Kuqian highway will improve economical development in Hanbin district, which have great effect on traffic status. Meanwhile, construction also has environmental impact on soil erosion, vegetation spoiling and environmental quality declining. With relevant measures taken, the environmental impact by the project will be reduced or eliminated, which is to be accepted by environment. 2.2 Landa highway and impact appraisal 2.2.1 project introduction and character Landa highway starts at Shiliangzi, stops at Dadaohe river at linkage of the A.-Beihai expressway, overall length is 44km, rebuilt length is 41km, newly built length is 3km. Subgrade earth work is 250000 3 m , which is of county class road, built under class 4 heavy hilly dual carriageway standard. The alignment travels heavy hilly area, along valleys of Sijihe river, Pingxihe river,Xiaozhenhe river, Dadaohe river. The line climbs over 680m newly built Baishiya tunnel. Construction is complicated with many difficulties and work quantities. Materials such as crushed stone, rock blocks, rubble abtained locally, water, sand from Lanhe river and Dadaohe river, cement purchased from Langao cement factory and Shimen cement factory, reinforcement can be purchased in Langao, asphalt from Ankong. 2.2.2 environmental introduction and character (1) Environment Land surface in the project area goes up and down, with hills, mountains and river terras, river flood plains. Forest coverage is up to 60%. Forest along the line consists of developed economic forests, such as tea, mulberry, lacquer tree, tungoiltree, and fruit trees as peach, plum, and walnut. With frequent human activities, there are few impacts on wild animal along the line. Environmental status of the project area shown as following fig: Physiognomy of Dadaohe valley Entrance of Baiyazhi tunnel (2) Water environment Water in upstream of Dahedao river rushes rapidly, with big falling height and great hydropower in project area. It is one of key stepping hydropower resources to be opened up in Langao County Monitoring point of water environmental quality was at merging place of Dahedao river to Hanjiang river (it is the linkage of Ankong-board of Shaanxi and Sichuan expressway and Landa highway, over which expressway bridge is to be built) . According to the test, water at the merge of Dahedao river to Hanjian river meets the planed class 1I standard, which indicates that water quality of Hanjiang river and its branches is in good condition. Actual data is shown in table 2-4. 137 EIA andEP Execution Frame ofLRIP Appendixs Table 2-4 result of water monitor on Landa highway Monitor factor Series River Location Time Remark PH SS CODm,, NH3-N Oil Tielu Hanjang TownNo I rHanjiang ferry 2005.5.15 7.32 6.0 1.8 0.130 find Mainline and river Langao Danda Tiount linkage, Town expressway 2 Hanjiang ferry 2005.5.16 7.43 3.0 1.7 0.149 Not bridge river find Langao county .. . (3) Acoustic environment Due to the poverty mountain area, villagers are quite separated from each other along the project line. 5 environmental noise monitor points are selected, among which 3 points are comparatively densely populated typical villages, such as Minzhu town, Shizicun village and Landa highway. Noise environment monitoring value is shown in Table 2-5. the results indicate that noise environment along the line is quite excellent. Table 2-5 monitor results ofnoise environment along La da highway Series Location Location Monitor result Typical Environmental description Day Night character Minzhu Right side of 58.9 40.3 county road (Lanzi The line is by town Landa road roadu) villager's gate Landa road 2 Shizicun passing 55.0 36.8 Remote rural place The line is by village through villager's gate Landa Landa road Landa road linkage to 3 road by Left side of 59.8 43.3 Highway the main road by Hanjiang Hanjiang river Hanjiang river reiver HninrIverI (4) atmospheric environment In project area, no industry pollution sources exists. "report of environmental monitor status and environment investigation" by Ankong monitor station (June, 2005) analyses that atmospheric environment alone Landa highway is excellent. (5) tourist environment The "Qiancenghe river" in the project area enjoys a beautiful scenery fame, as it connects to Shenheyuan forest park, it has very good developing potential. (6) major sensitive points Siji river, Pinxi river, Xiaozhen river, Dadaohe river, Hanjiang river, Laopingxiang town, Pingxi farm and Minzhu Town. 2.2.3 Major environmental impact and reducing measures ( I ) environment impact and reducing measure The project mainly takes up forest land (mainly man made forest) and a little farm land, generally speaking, environmental impact is quite little. But stress shall be laid on negative influence on environment 138 EIA andEPExecution Frame ofLRIP Appendixs by tunnel and bridge construction. Relief method: ( dumped ballast from Baizhiya tunnel shall be treated with protection, graded very soon after construction, covered with processed soil for vegetation or farming against new soil erosion. ( dumping in construction shall be assigned in uniformed manner. Retaining protection work shall be applied against slide into river. ® forest cutting is forbidden, No quarry, sand taken and soil borrow in forest. (A) tunnel blasting and excavation shall be under control in scale, avoiding large scale vibration on mountain stability. (2) water environment impact and reducing measures the impacted rivers along the line are Dadahe river and Hanjiang river, construction of bridge will affect water quality in short period, mainly on SS. Relief methods: Water used in Baiyazhi tunnel construction shall be recycled in concrete sediments against pollution source increasing. (3 ) acoustic environment impact and reducing measures Acoustic environmental impacts on villagers along the line in Landa highway construction mainly convergence in construction period. Relief methods: It is recommended that large scale of construction equipments be set 150m apart from densely populated residential area, especial from Xiaozhen street and Minzhu town. (4) social environmental impact and reducing measures With the tourist development of "Qiancenghe" scenery, upgraded by road building, bringing up the local economy, increased tourists may spoil the natural environment. Relief method: Recommend the relevant departments enhance management. ( 5 ) other protection measures (0 contractors shall rent local houses as their working sites or set within the R.O.W. as many as possible, and also take positive measures to reduce residential sewage or wastes against water pollution. () Waste water is not allowed to be discharged directly into rivers. (©) enhance protection work on workers working in noise sources. 2.2.4 Public participation For the purpose of listening to suggestion and comments from various social communities, we called on rap sessions, interviewing individuals and distributing opinion polls. Investigation content includes: ( I ) inquiring about attitudes on proposed highway construction from the individuals interviewed; ( 2 ) inquiring about people's opinions on the highway alignment, demolition, relocation, compensation and land acquisition and environmental protection; (3 ) inquiring about their attitude toward the impacts on social economical development status, folk cultures. Investigation shows that the majority people hope the project will built up with both quality and quantity secured, to promote economical development; give full consideration of local people's interest, strictly comply with relevant laws and prescriptions. 139 EIA andEP Execution Frame ofLRIP Appendixs 2.2.5 Environmental management plan The project environmental protection management is due to Traffic bureau of Ankong city, and implemented by Langao traffic bureau. In the construction period, environment monitor shall be enhanced. Environment protection plan, except from variation design, land acquisition, relocation and compensation, shall be implemented by construction units and Engineer supervises the implementation. Environment monitor is to be executed by environmental monitoring station of Langao county. Major monitoring items are noise, water quality, atmosphere complying with relevant state standard. 2.2.6 Summery on appraisal The rebuilding of Landa highway will improve economical development in Hanbin district, which have great effect on traffic status. Meanwhile, construction also has environmental impact on soil erosion, vegetation spoiling and environmental quality declining. With relevant measures taken, the environmental impact by the project will be reduced or eliminated, which is to be accepted by environment. 2.3 environmental appraisal on Tiemiao highway 2.3.1 project introduction and character The proposed Tiegongmiao highway lies to the east of Tielu town Ankong city. It is a town class highway from Tielu town to Wenhua village. The highway starts at Shagoukou, Fengxing village (K42+ I00m of Landa highway), stops at Wenhua village, total length 12km. Work commences in March 2006, completing in Sept, 2006. Reinforcement and cement can be purchased in Minzhu town; rubble and rocks can be quarried along the line, sand taken in Dadaohe river. The alignment travels over hilly mountain, along Shagouhe river valley, rebuilt project of heavy hilly class 4 dual carriageways. 2.3.2 environmental introduction and character ( 1) Ecology environmental status The alignment is to be set along Shagouhe river valley. On both sides of the river way, there are steep mountain slops, in between are little rice fields and dry lands. Rainfall in the project area is abundant, with verdant forest and beautiful natural landscape. The abundant living resources in the project area have a powerful vegetation recovering capacity. No wild animal trail is found and no major wild animal protection in the area.. The status of Tiemiao highway is as follows: .4 Status of Tiemiao highway landscape of Shagouhe river valley 140 EIA andEP ExecutionFrame ofLRIP Appendixs (2) water environment status Shagouhe river flows the overall area from east to west, forest in the area is verdant, rain is abundant, signs of human habitation is quite few, so is industry, thus manmade pollution is slight, ground water quality is excellent. (3 ) acoustic environment The project area is called Daba Mountain, which is high with little habitation, acoustic environment is excellent. The onsite monitored noise value by the appraisal group is 36.3dB (background sound consists of birds singing and water flowing). (4) status of atmospheric environment No large-scale industry enterprise along the alignment, thus, atmospheric pollution is mainly natural dust, enviromnent quality is excellent. (5) social and tourist environment Once the highway opened to traffic, it will benefit transportation of silkworm, konjak, lacquer and other forest products, improving local economy development and reliving poverty in this area. (6) Major sensitive points Shagouhe river 2.3.3 Major environmental impact and reducing measures ( I) Environmental impact and reducing measures As there is dense forest coverage in the project area, thus, construction will spoil certain vegetation, causing new soil erosion. Relief method: It is recommended that immediate planting of shrubs and grass on exposed ground caused by construction. (2) Water environmental impact and reducing measures The major river that the line travels is Shagouher, major influence of the project on the river is from sewage outlet, which may pollute ground water and solid waste, sewage, from construction sites and resident sites, if not well treated, it will endanger water quality of the river in heavy rain. Relief methods: (O) oil water, sewage shall not be discharge into river directly. () waste must be collect and treated on time. () intensify material management. No asphalt, oil and other chemical hazard material being stored by the river or wells, storage must be covered with covers. (3) Noise environment impact and reducing measures There are very few but separated noise and air sensitive points in project area, the impact on which mainly is mainly in construction period. Relief methods: It is recommended that large-scale construction equipments be set 150m away from dense resident villages; besides, operation period shall be adjusted properly. (4) Social and environment impact and relieving measures Construction is done in mountain area, which may cause some health hazard toward construction personnel. Relieving method: Enhancing health and medical check on workers. (5 ) other environmental protection measures 141 EIA andEPExecution Frameof LRlP Appendixs (Dcontractors shall rent local houses as their working sites or set within the R.O.W. as many as possible, and take positive measures to reduce residential sewage or wastes against water pollution. iD Waste water is not allowed to be discharged directly into rivers. ( construction site shall be set far away from river system. (A) quarry for material collection shall comply with submission and approval procedures and implement construction prescription. Purchased materials must satisfy quality and environmental requirements. 2.3.4 Public participation For the purpose of listening to suggestion and comments from various social communities, we called on rap sessions, interviewing individuals and distributing opinion polls. Investigation content includes: ( 1 ) inquiring about attitudes on proposed highway construction from the individuals interviewed; ( 2 ) inquiring about people's opinions on the highway alignment, demolition, relocation, compensation and land acquisition and environmental protection; (3) inquiring about their attitude toward the impacts on social economical development status, folk cultures. Investigation shows that the majority people hope the project will built up with both quality and quantity secured, to promote economical development; give full consideration of local people's interest, strictly comply with relevant laws and prescriptions. 2.3.5 Environmental management plan The project environmental protection management is due to Traffic bureau of Ankong city, and implemented by Langao traffic bureau. In the construction period, environment monitor shall be enhanced. Environment protection plan, except from variation design, land acquisition, relocation and compensation, shall be implemented by construction units and Engineer supervises the implementation. Environment monitor is to be executed by environmental monitoring station of Langao county. Major monitoring items are noise, water quality, atmosphere complying with relevant state standard. 2.3.6 Summery on appraisal Within the appraisal scope on both sides of the project line, there are natural forest, farm production and resident area, without industry. Vegetation in the area is in good condition and atmosphere is excellent, environmental capacity is great. Farmers live separately, environmental noise and atmosphere has little impact on living surroundings. As the vegetation in the project area has a good natural restoring ability, thus environmental impact on ecological environment such as soil erosion, can be eliminated or reduced, unless proper measures are taken. It is noticeable that Shagouhe river flows through the overall project area from east to west, as a result, construction unit shall take whatever measures to prevent water pollution by road building in their construction management. 2.4 Environmental impact appraisal of Yuzi highway 2.4.1. Project introduction and character Yu (Dub) - Zi (Yang) highway starts at Yuduba, Zhenba County Hanzhong city and terminates at Ziyang county town, 74.5km in Ziyang County. The alignment travel from starting points down along the river to northeast, paralleling with Xiang-Yu railway, passing Maliu town, Maoba town, Gaotan town, Gaoqiao town, Bajiao township, Xiangyang town, Chengguan town, arriving at Ziyang countytown. It is the only provincial highway among the 109 roads of rural-highway-rebuilt project, designed as class III heavy mountain hilly dual carriageways. Total investment on this highway is 59.600433 million. The alignment is layout along Renhe river valley, with many bridge works (31 Om/2 1 each), and large 142 EIA andEPExecution Frame ofLRIP Appendixs protection work quantity (240000 m3 ) Construction materials . sources: block rock, rubble and sand come from local, cement, timber can be purchased in Ziyang,Ankong or Wanyuan. 2.4.2. Environmental introduction and character ( I ) Ecological environment The climate is wet; rainfall is abundant, suitable for vegetation growing. In high mountain area, it is covered with natural secondary forest while in major lower river valley, apart from farm crops, covered with shrubs and grass. Soil erosion module is 1755.4t/km2 year, belonging to medium erosion area. There are high mountains and steep slops with deep ravines, up-and-down surface, weathered rock easy breaking or causing landslips and landslides in the project area. (2) Water environment The major river is Renhe, which is a branch of Hanjiang river. According to environmental monitor report by Ankong environmental monitor station, tests result of Renhe water quality is shown in table 2-5, the result indicates Water quality of Renhe river is excellent. Table 2-5 Monitor data of water quality of Renhe section Monitor items Term of secti PH SS(mg/L) CODMN(m NH3-N(mg/ Oil type Testing time g/L) L) Renhe (under Renhe bridge, Gaotanzhen, Ziyang , 7.29 5.0 1.3 0.102 Not tested 2005.5.20) Renhe (under Renhe bridge, Gaotanzhen, Ziyang , 7.41 4.0 1.1 0.111 Not tested 2005.5.21) I _ (3) Acoustic environment Most of the rebuilt alignment sections are in the river valley of bad road condition, with less traffic at night. Given that, the group tested only daytime environmental noise. The result is shown in table 2-6. Table 2-6 monitor value of environmental noise along the highway Monitor. Monitor Series Place name Moms Typical value Environment character Leq (db) At the merging of Quanhe river and I Quanhekou Traffic noise Village by 65 0 Renhe river, a few business highway individuals, flowing water and cicada sound. Maoba Townsfiip by Maoba town street, 1.5m from rebuilt 2 Moba Traffic noise T hiphby 68.6 road, sound of cicada at toe of mountain slop. 3 Rangou Environment Village by 50.4 about 500 household, 1800 people, village noise highway 100m north mountain slop. sound of 143 EIA and EP Execution Frame of LRiP Appendixs |00m north mountain slop, sound of cicada. The result shows that pavement condition of the existing road is very poor and traffic noise has some impact on villagers but very little, basically meets the type 4 standards. Population in the project area is small but distributed on both sides of the existing highway. (4) social environment Yuzi highway will bring up 18 townships, totaling 60582 households, 240143 people, benefiting 91286 people. Along the line, there exists the 5-northwestern-province assembly hall built from earlier period to the final stage of Qing Dynasty at Wafangdian mountain ranges, as the alignment is on the opposite bank of the river, the impact will not be much. ( 5 ) Atmospheric environment Monitor test on atmospheric environment is set at 2# Yonghua Hotel Maoba town, Ziyang County, the result is in table 2-7. The result indicates: nitrogen dioxide (N02), TSP thickness in the atmospheric environment along the line does not exceed the standard. (6) Environmental sensitive points Renhe river, Quanhe river mouth, Maoba town, Rangou villege, Xintao village. Table 2-7 Atmospheric environment monitor result Unit: mg/mi3 Monitor point 2" Yonghua Hotel Maoba town, Ziyang County Monitor Environment air NO2 result Environment air TSP result 8: 00 11: 00 14: 00 17: 00 8: 00 10: 30 14: 00 16: 30 Monitor day 2005-5-23 0.013 0.011 0.012 0.011 0.013 0.075 0.074 0.150 2005-5-24 0.013 0.012 0.015 0.013 0.116 0.093 0.067 0.096 2005-5-25 0.013 0.015 0.029 0.013 0.097 0.119 0.071 0.043 2005-5-26 0.013 0.015 0.013 0.014 0.128 0.098 0.089 0.054 2005-5-27 0.008 0.013 0.013 0.012 0.054 0.065 0.095 0.065 2.4.3. Major environmental impact and reducing measures ( I ) Ecological environment impact and reducing measures The project is of rebuilding the existing road, basically the original alignment is to be maintained. Land for construction is mostly within the R.O.W, besides, the area that the line goes through is in steep mountain slops, where uncultivated waste mountain slops cover a large part of section. Land acquired for the project is only a few of rice and forest pieces. To be provincial highway, the design shall be reasonably made by taking full account of land scenery and using as much biological protection technique as possible. On the one hand, it may avoid soil erosion, also, it will bring better landscape to the alignment. The hazard sections such as slop sliding, subgrade-sinking shall be treated by clearing up loose rocks, setting up retaining wall and replacing soft soil. Care shall be given to slop stability. After it is opened to traffic, care for vegetation shall be highlighted by dead tree replacement, cutting and maintaining work, making vegetation flourish and nice to ensure highway landscape. (2) Water environment impact and reducing measures 144 EIA andEP Execution Frame ofLRIP Appendixs Construction units shall not divert rivers at discretion unless reasonable diverting plan is submitted for approval. Borrow pit shall not be otherwise set within riverway apart from the existing pits, the pits shall not affect flood discharge and bank landscape, it shall be assigned within particular sections; proper protection work shall be arranged in construction period for preventing sand from being rushed into any river. In bridge and culvert construction, installation and removing of form-work, arch false-work shall be T matched with protection measures against water pollution by falling components and concrete. In each construction items, major pollutants are suspended substance in construction sewage, which must be treated in sediment before being discharged. As sand and gravel will be taken from river during construction, it may have big impact on any water system and quality. It is suggested immediate grading shall be arrange soon after sand collection to ensure current flow unblocked. After it opens to traffic, there is potential risk of transporting dangerous chemical substance along the highway; it is advisable to have the local government fulfilled with proper condition on dealing with emergences. (3 ) Acoustic and air environmental impacts and reducing measures Sensitive points of acoustic and air environment are quite less, unfocused. Major impacts come from construction period. For the reducing measure, see 4.2.2.1.4 (4) Social and environment impact and reducing measure The project is characterized as class III heavy hilly highway, vehicle speed is fast, thus, it is advisable to set up traffic signs near villages to avoid traffic accidents. The acquired and claimed land in highway construction shall be compensated sooner the better. (5) other environmental protection measures In vulnerable ecological area, surface and vegetation soil shall be collected in good storage and construction shall be planned in stages so as to have vegetation soil replaced on the earlier completed slops of subgrade or borrow pits, keeping damage of surface vegetation to minimum. Eating and washing ups of construction personnel shall be under uniformed management, such as gathered eating and washing-up, for reducing living sewage quantity. Washing scour must be under control, using hot water for replacement of wash scour or other replacing methods. Any vehicles conveying loose particle materials shall have covers, avoiding material spreading and dusting, it includes all types of stones, cement, rock powder, subgrade material, and planting soil. 2.4.4. Public participation For the purpose of listening to suggestion and comments from various social communities, we called on rap sessions, interviewing individuals and distributing opinion polls. Investigation content includes: (I ) inquiring about attitudes on proposed highway construction from the individuals interviewed; ( 2 ) inquiring about people's opinions on the highway alignment, demolition, relocation, compensation and land acquisition and environmental protection; (3 ) inquiring about their attitude toward the impacts on social economical development status, folk q cultures. Investigation shows that the majority people think the project will improve invest environment for the area, promoting economical development, benefiting living condition and quality, it will have positive significance to both the state and the local. 2.4.5. Environmental management plan The project environmental protection management is due to Traffic bureau of Ankong city. In the construction period, environment monitor shall be enhanced. Environment protection plan, except from 145 EIA andEPExecution Frame ofLRIP Appendixs variation design, land acquisition, relocation and compensation, shall be implemented by construction units and Engineer supervises the implementation. Environment monitor is to be executed by environmental monitoring station of Ziyang County. Major monitoring items are noise, water quality, and atmosphere complying with relevant state standard. 2.4.6 Summery on appraisal The rebuilding of Yuzi highway will improve economical development of Ziyang County, which has great effect on traffic status. Meanwhile, construction also has environmental impact on soil erosion, vegetation spoiling and environmental quality declining. With relevant measures taken, the environmental impact by the project will be reduced or eliminated, which is to be accepted by environment. Thus, the appraisal believes the construction of this project is feasible. 2.5 Environmental impact appraisal of Gunsan highway 2.5.1. Project introduction and character the proposed rebuilt Gunsan highway starts at Gunziya (K61+850 of 310 provincial highway), passing through Nanmu village, Chengguan town, Majiazhuang village, Yunfeng village, Donghe village of Donghe Town, terminates at Donghe Town street (original Santai Town) . This project alignment goes through from Gunziya, traveling down Xiaomi stream to southeast direction, terminating at Donghe town. It is of county road. The overall alignment is of rebuilt project, rebuilt into two lanes of class IV heavy mountain hilly highway. Rebuilt length is 15.584Km, total investment 8.10368 million. Work commence in Mar. 2006, completes in Dec. 2006. Major work quantity: subgrade soil and rock: 80, 000m ; protection quantity: 3 22, 000 mi3; bridge quantity: 65m/3 bridges; culvert: 41. Sources of construction material: rubble, rock block and sand gravel can be collected locally, cement, timber purchased in Ziyang, high-class cement purchased in Ankong. 2.5.2. Environment introduction and character Gunsan highway lies in the camber structure strap of Qinba Mountain, which is in ridges and peaks, multi-up-and-down ravines. Continuous mountain ranges are cut into separated ridges. Project is difficult. The line is mainly laid along Xiaomixi valley; the area is covered with high rate ofvegetation. Typical environment condition is shown in following pictures: t~~~~~~~~A -~ Present status of Gunsan highway Vegetation status of existing Gunsan road 2.5.3. Major environmental impact and reducing measures (I ) Ecological environmental impact and reducing measures To reduce new soil erosion source, it is advisable to avoid high fill and deep cut in profile section, the 146 EIA and EPExecution Frame ofLRIP Appendixs more balanced earthwork design the better for reducing waste. Meanwhile, make good design on drainage and protection work, avoiding rain rush on mountain, farm and forest as well as other facilities. After completion of the project, clear and return occupied land back for recultivation, soon. For the strap-like-road rebuilt project, the major impact on agriculture ecology environment is from dust pollution on crops along both sides of the road by construction. Especially during the chrysalis period, too much dust on mulberry leaf will make cocoon impossible, -' thus, farmers income will be affected. It is advisable to sprinkle water in dense mulberry field section and apply covers on vehicles. (2) Water environment impact and reducing measures The major river that Gunsan highway passes is Xiaomixi stream, which is class one branch of Hanjiang river. Construction will hence affect water quality of Hanjiang river. Management shall be enhanced on pollution control on sand material washing, oil dripping from vehicles and sewage drains from residential sites. Waste materials, asphalt, oil, chemical substance and living waste shall be stored far away from rivers. Vehicles, machines and boats for construction must be routinely maintained against dripping accident occurring on water pollution. (3) Acoustic environmental impact and reducing measures Sensitive points of acoustic and air environment are quite less, unfocused. Major impacts come from construction period. For the reducing measure, see 4.2.2.1.4 (4) Atmospheric environmental impact and reducing measures Construction sites, mixing plants and other temporary land shall be hardened as much as possible to reduce dust. Working sites, access roads shall be sprinkled on fixed times and frequence, which shall be assigned in accordance with local weather forecast and sensitivity of vegetation. (4) Social environment impact and reducing measures While the road construction may promote local economical development, it may also have negative impact on environment. Relief method; Relevant local departments shall enhance management and environmental protection education. (5) Other protection measures ( contractors shall rent as many local houses as possible as their working sites or set within the R.O.W. and take positive measures to reduce residential sewage or wastes against water pollution. (©) construction units must select equipments, vehicles in conformity with related state standard, ensuring that the pollution discharge conforms to the state standard. Enhance maintenance on equipments of good running. () working sites shall be set far away from Xiaomixi stream. Waste water is not allowed to be discharged directly into rivers. 2.5.4. Public participation * For the purpose of listening to suggestion and comments from various social communities, we called on rap sessions, interviewing individuals and distributing opinion polls. Investigation content includes: (I) inquiring about attitudes on proposed highway construction from the individuals interviewed; (2 ) inquiring about people's opinions on the highway alignment, demolition, relocation, compensation and land acquisition and environmental protection; (3 ) inquiring about their attitude toward the impacts on social economical development status, folk cultures. Investigation shows that the majority people hope the project will built up with both quality and 147 EIA andEP Execution Frame of LRIP Appendixs quantity secured, to promote economical development; give full consideration of local people's interest, strictly comply with relevant laws and prescriptions. 2.5.5. Environmental management plan The project environmental protection management is due to Traffic bureau of Ankong city. In the construction period, environment monitor shall be enhanced. Environment protection plan, except from variation design, land acquisition, relocation and compensation, shall be implemented by construction units and Engineer supervises the implementation. Environment monitor is to be executed by environmental monitoring station of Ziyang County. Major monitoring items are noise, water quality, and atmosphere complying with relevant state standard. 2.5.6. Summery on appraisal Through on site survey and investigation, the project designing unit made a full consideration of natural status, river, villages, etc into thedesign. From point of ecology and social environmental protection, the plan is reasonable and feasible. 2.6 Appraisal of environmental impact on Hongniu road 2.6.1 Project introduction and character Hongshan-Niuti highway lies in the west part of Hanbin District, the line starts at Hongshan Town by Hengkou, Ziyang road of (S310) provincial highway (K31+000), terminates at Niuti Township, Hanbin District, total length of 30Km, belonging to county road rebuilt project. Hongniu road is built as class IV dual lanes heavy mountain hilly highway technical standard. Subgrade earth quantity is 71700m3, protection quantity is 7350 m3 , pavement quantity is 135000 m2 , 68 culverts. Total cost is 11.994964 million, and the basic highway cost is 399,830/Km. Work commences in 2008. Future mean traffic volume is 189 vehicles/day. Rock, rubble, macadam and sand gravel along the line is abundant, which can be collected by contractors at assigned pits. Reinforcement, cement can be purchased in market. 2.6.2 Environmental introduction and character ( I ) Ecology environment The project lies in Qinba mountain area, much of which is along streams.climate is seasoned with various trees, flowers and grass, vegetation coverage is high, mixed with shrubs. ri. ~~~.. i L- ' ,,, S,;|3*. . .. Stream by road Status ofHongniu road (2) Acoustic environment As the line locates in deep mountain, acoustic environment is quite excellent. (3) Water environment There are many streams in the mountain area. As there exists little population in this large mountain, 148 EIA and EPExecution Frame ofLRIP Appendixs water quality in the streams is hardly affected by human activity, generally, quite excellent. (4) atmospheric environment According to "Environmental status communique of Shaanxi province 2003", the three index of TSP, sulfur dioxide, nitrogen dioxide in Ankong city conform to class 1I state standard. Due to no industry or mining in the project area, it is presumed that air quality must be excellent. (5) Social environ-ment Hongniu road is the only road that connects with out side for people in Niuti Township,Shizhuan Town and Hongshan Town, project benefiting covers 34620 people in Niuti Township,Shizhuan Town, Hongshan Town and Songping village. (6) Sensitive environment points: Niuti Township,Shizhuan Town, Hongshan Town and Songping village. 2.6.3 Major environmental impact and reducing measures ( 1 ) Ecology environmental impact and reducing measures Major ecology environmental impact appears as damage ground vegetation along the line. The construction will increase soil erosion. After project is complete, place vegetation soil or recultivate the site as soon as possible, which may reduce the impact. Relief methods: (ID redefine positions of temporary land, borrowing and dumping pits, making the style, quantity of construction more reasonable, using as much waste, low production land as possible before commencement. ( defining the designs in respects of main part of project, method of removing, storing and erosion protection for vegetation soil on borrow and damp pits and temporary land, so as to secure the mellow surface soil be reused in future cultivation of the sites. (M)immediately after temporary land acquisition complete, the land shall be recultivated and placed with planting or vegetation as soon as possible. (2) Acoustic environment impact and reducing measures Due to the large Environmental allowance along the line, less traffic volume, it is presumed thattraffic noise may meet the standard. Construction noise will have impact on acoustic environment quality, mainly affect the area within 130m in daytime and 480m at night. Relief methods: (IDmake control on location of large scale equipments and adjust operation time (reduce night operation). ® enhance maintenance and repairing of all types of equipments, to have them in good running for reducing noise sources. (3) Water environment impact and reducing measures The main pollutants are construction materials, waste, and sewage from resident sites contaminating ground water quality. Traffic volume in operation stage is not quite large, and with environmental allowance of the river, it is presumed that the impact of runoff ofroad surface on water quality is minor in road operation stage. Relief method: ( in construction, material such as asphalt, oil, chemistry shall be stored far away from river or covered with cover if necessary. ©)no storage placement of any road construction material or discharge hazard contents, waste, and borrow or damp along both sides of the river. (©) no sewage discharged randomly into rivers, no storage of waste from resident camps (4) Atmospheric environmental impact and reducing measures Major environmental impact of the project is of dust in construction period, such impact can be reducing by placing covers on vehicles and distant arrangement of mixing plant from local residents (lOOm away) (6) Social environmental impact and reducing measures Heavy-duty vehicles may damage pavement and increase traffic and safety hazard in construction period. Maintenances on road pavement shall be strengthened during construction. (5) Other environmental protection measures 149 EIA and EPExecution FrameofLRIP Appendixs (D contractors shall rent local houses as their working sites or set within the R.O.W. as many as possible ) construction site shall be set far away from river system. ( asphalt mixing plant shall be set far apart from residential area or 200m from sensitive points down wind direction (A) quarry for material collection shall comply with submission and approval procedures and implement construction prescription. Purchased materials must satisfy quality and environmental requirements. 2.6.4 Public participation For the purpose of listening to suggestion and comments from various social communities, we called on rap sessions, interviewing individuals and distributing opinion polls. Investigation content includes: ( 1) inquiring about attitudes on proposed highway construction from the individuals interviewed; ( 2 ) inquiring about people's opinions on the highway alignment, demolition, relocation, compensation and land acquisition and environmental protection; (3) inquiring about their attitude toward the impacts on social economical development status, folk cultures. Investigation shows that the majority people believe that the project will increase their contacts with outside world, promote local economical development; benefit for improving their living condition and living quality. 2.6.5 Environmental management plan The project environmental protection management is in charged by Traffic bureau of Ankong city, implemented by Traffic Bureau of Hanbin District. Environment monitor shall be enhanced during the construction. Environment protection plan, except from variation design, land acquisition, relocation and compensation, shall be implemented by construction units and Engineer supervises the implementation. Environment monitor is to be executed by environmental monitoring station of Hanbin District. Major monitoring items such as noise, water quality, atmosphere, are in conformity with relevant state standards. 2.6.6 Summery on appraisal Hongniu highway is in Qinba mountain area, which is of line paralleling will streams. Environmental restoring work shall be carried out in later period of construction. project construction impact on environment is basically accepted, this project is feasible. 150 EIA andEP Execution Frame ofLRIP Appendixs Appendix 4: Document mode of environmental appraisal * Document mode of environmental appraisal I Forms of Environmental Appraisal 2, Form of trust deed 3, Submission Letter 151 EIA and EPExecution Frame ofLRIP Appendixs Mode of "Form of environmental appraisal" Environmental Appraisal of Construction Project in Shaanxi Province Form of Report (To be used in ecotype construction project) Environmental appraisal of--- ruralroad project, Ankong highway Project name development project Shaanxi province Builder (Sealed) Traffic communication bureau Ankong City Legal person (Seal or signature) Contact person Telephone Post code Filled by Environmental Date Received department No. Made by Shaanxi Environmental Protection Bureau 152 EIA andEP Execution Frame ofLRIP Appendixs a -9 Certification of environmental appraisal Color contraction print (Pasted) Person Post No. Signature 153 EIA andEP Execution Frame ofLRIP Appendixs I. Basic status of the project Project term X X rural road project Builder Traffic bureau, Ankong city Project site X X Village X X Town X X County Building Proposed rural road project of Ahkong highway development project Shaanxi base province Building Newly built C1 rebuilt O character Building Total scale scale Environmenta Total invest I protection invest 11. Major environment aims III. General introduction of localsocial, economy and environment IV. Anticipation ofenvironmental impact V. Public participation and information publicity VI. Environmental management plan VIl. Environmental protection measures VIII. Environmental protection investment and analysis on economical profit and loss by environmental impact IX. Summary and suggestion 154 EIA and EP Execution FrameofLRIP Appendixs Summary sheet of basic status of rural road in X X year Ankong highway development, Shaanxi province Town Building scale and standard covered c Villages coveredteoafter l Project covered completion Attached Admin. Building Paveme investmen Pover Populati Series to County, Project term Complet nt / Pavem . Total Remark . . ~~~~gradecharacter Scale t fumb Village ty on District (km) ed Class subgrad ent (10,000) er Town name popula popul benefite (km) e width type tion 155 EIA and EPExecution FrameofLRIP Appendixs Schedule of environmentalsensitive points in rural road project inAnkong highway development Shaanxi province in year X X Land form Environmental sensitivepoints River, Other Tree in Animal environ Remark Seri Project term Slight Heav Farm field/ reservoir, Dense school protectio protectio mental es project plane ht heavy undament mudflat, water residential n n sensitive locates hilly hilly al field source area protection aims = = _ _ _ _ l _ _ 156 EIA and EP Execution Framne ofLRIP Appendixs Municipal environmental protection administration department (checkup) comment: :t ( Seal) Signature: year month date 14 157 EIA andEPExecution Frame ofLRIP Appendixs Sample of environmental appraisaltrust deed Trust Deed X X X: According to "Law of environmental impact appraisal of P.R.C. ", we hereby give the authority to X X for making environmental impact appraisal on "'XX year rural road rebuilt project". In X X year plan, there are totally X X rural roads, among which X X roads are class III, X X roads are class IV, totaling length is X X km. We hereby give our trust. X X X Traffic bureau X X of date, X mouth X year Sample of "Submission": Submission letter on "Environmental impact report of rural road rebuilt project ofAnkong highway development project, Shaanxi province" X X X Environmental protection bureau: According to "Law of environmental impact appraisal of P.R.C. ", we hereby give the authority to X X for making environmental impact appraisal on X X year rural road rebuilt project of Ankong highway development project of Shaanxi province (X X rural roads, are class 111, X X roads are class IV , totaling length is X X km.), hereby "Environmental impact report of rural road rebuilt project of Ankong highway development project, Shaanxi province" has been written. We hereby submit the appraisal report for approval For the details of the project, please referto annexes forms. (for the annexes it can be referred to Schedule of environmental sensitive points in rural road project in Ankong highway development Shaanxi province in year X X) X X X Traffic Bureau x XyearXmouthXday 158 13 ~~~~~F '- >j.3F-- VA Ql ~~~ ~~~~~~4NotA - a~~~ ~ ~ ~ -. S~~~~~~~~~~~~ 5i5 I HR ~~~~~~ AB ;7~~~~~~~~~~~~~~~~ JrD -d Au : Rt-1 0 r4 ;. R r~~~~~a I i 1 V -- ~ K S~~~~~~~~~~~~~4 1 pI W f t5 I!!5P~~~~lt-_A-'g 4-mg. ~~-J +~~ ~ V I