Supplemental Letter


                                STATE OF HIMACHAL PRADESH



                                                                                     November 26, 2021


International Bank for Reconstruction and Development
1818 H Street, N.W.
Washington, D.C. 20433
United States of America


        INDIA:      Loan No. 9295-IN
                    (Shimla-Himachal Pradesh Water Supply and Sewerage Services
                    Improvement Program)
                    Performance Monitoring Indicators

Dear Sirs and Mesdames:

         We refer to Section III.A of Schedule 2 to the Loan Agreement of even date between India and the
International Bank for Reconstruction and Development (Bank) and Section III.A of Schedule 1 to the
Program Agreement.

       Unless otherwise agreed with the Bank, we shall monitor and evaluate implementation of the
Program in accordance with the Performance Monitoring Indicators attached to this letter.


                                            Very truly yours,

                                STATE OF HIMACHAL PRADESH




                                    By_______________________
                                      Authorized Representative




Attachment – Performance Monitoring Indicators
                                                                                   Results Framework
                                                                                    COUNTRY: India
                                                 Shimla-Himachal Pradesh Water Supply and Sewerage Services Improvement Program (PforR)


Program Development Objective(s)
The PDO is to strengthen the operational and financial performance of the SJPNL Utility and improve access to water supply and sewerage services in
Shimla City.

ESULT_FRAME_T BL_PD O




Program Development Objective Indicators by Objectives/Outcomes
Indicator Name                                 DLI Baseline                                                   Intermediate Targets                                       End Target
                                                                            1                      2                      3                       4
Support the GoHP institutional program for improving WSS services that are efficient and accountable

SJPNL strengthened as an                                                   All financial and      All financial and      All financial and       All financial and       All financial and
                                                  WSS company
autonomous WSS Company                                                     managerial decisions   managerial decisions   managerial decisions    managerial decisions    managerial decisions
                                                  established
(Text)                                                                     taken by the BoD       taken by the BoD       taken by the BoD        taken by the BoD        taken by the BoD

SJPNL achieves operational
efficiency and financial                          see sub-indicators                                                                                                     see sub-indicators
sustainability (Text)

                   SJPNL improves energy          Energy consumption per
                                                                         Reduces to 12.5 KWH      Reduces to 12.0 KWH    Reduces to 11.5 KWH     Reduces to 11.0 KWH     Reduces to 10.4 KWH
                   efficiency by 20% (Text)       KL of water is 13 KWH.

                   SJPNL reduces Non-
                                                  To be determined in first                       NRW is 3.75% less than NRW is 7.5% less than   NRW is 11.25% less than NRW is 15% less than
                   Revenue-Water by 15%                                     Baseline determined
                                                  year                                            baseline               baseline                baseline                baseline
                   (Text)

                   O&M Cost Recovery in
                                                  120%                     131%                   142%                   153%                    164%                    175%
                   water distribution (Text)

Number of people benefitting
                             DLI 7 see sub indicators                                                                                                                    see sub indicators
from improved WSS services
ESULT_FRAME_T BL_PD O




Program Development Objective Indicators by Objectives/Outcomes
Indicator Name                   DLI Baseline                                                             Intermediate Targets                                            End Target
                                                                  1                         2                         3                         4
(Text)

(i) Number of people having
access to continuous water          0.00                         0.00                      850,000.00               1,700,000.00              2,550,000.00                3,400,000.00
supply (Number)

(ii) Number of additional
people provided with                0.00                         272,000.00                544,000.00               816,000.00                1,088,000.00                1,360,000.00
sewerage services. (Number)

Intermediate Results Indicator by Results Areas
RESULT_FRAME_T BL_ IO




Indicator Name                   DLI Baseline                                                             Intermediate Targets                                            End Target
                                                                  1                         2                         3                         4
Improved governance, managerial and financial autonomy of SJPNL
At least 80% of SJPNL                                                                      20% of SJPNL employees 40% of SJPNL employees 60% of SJPNL employees 80% of SJPNL employees
                                                                 SJPNL prepares and
employees receive incentives        No incentive policy for                                receive incentives as per receive incentives as per receive incentives as per receive incentives as per
                                                                 adopts performance
as per the performance              SJPNL employees                                        the performance           the performance           the performance           the performance
                                                                 incentive policy.
incentive policy. (Text)                                                                   incentive policy.         incentive policy.         incentive policy          incentive policy.
At least 30% women employed
as contractual staff in SJPNL.      20%                          At least 25%              At least 30%             At least 30%              At least 30%              At least 30%
(Text)
SJPNL implements                    Performance based            SJPNL awards              Completion of           Completion of           Completion of           Completion of
performance-based payments          contract for intra city      performance-based         performance audit of    performance audit of    performance audit of    performance audit of the
to the private water supply         water distribution under     contract for intra city   the Operator through an the Operator through an the Operator through an Operator through an
operator (Text)                     preparation                  water distribution        independent agency      independent agency      independent agency      independent agency
Five-year business plan                                          SJPNL Business Plan       SJPNL Business Plan      SJPNL Business Plan       SJPNL Business Plan       SJPNL Business Plan
                                    No Strategic Business Plan
approved and adopted (Text)                                      Adopted                   Adopted                  Adopted                   Adopted                   Adopted
HR policies reviewed and
                                                                                           HR Gender Policy in      HR Gender Policy in       HR Gender Policy in
revised to promote gender           No HR Gender policy          No HR Gender policy                                                                                    HR Gender Policy in place
                                                                                           place                    place                     place
equality in the workplace
RESULT_FRAME_T BL_ IO




Indicator Name                   DLI Baseline                                                            Intermediate Targets                                                  End Target
                                                                   1                          2                          3                          4
(Text)
Improved efficiency, financial sustainability and customer accountability
                                                                  SJPNL redresses at least   SJPNL redresses at least   SJPNL redresses at least   SJPNL redresses at least   SJPNL redresses at least
SJPNL redresses at least 90%
                                     Grievance redressal          90% WSS grievances         90% WSS grievances         90% WSS grievances         90% WSS grievances         90% WSS grievances
WSS grievances within the
                                     system exists                within the specified       within the specified       within the specified       within the specified       within the specified
specified period (Text)
                                                                  period                     period                     period                     period                     period
Percentage of 24 / 7 customers
billed on volumetric basis           0%                           10%                        30%                        40%                        80%                        At least 90%
(Text)
SJPNL scores at least 70% in         Pilot citizen satisfaction   SJPNL achieving at least SJPNL achieving at least SJPNL achieving at least SJPNL achieving at least SJPNL achieving at least
customer satisfaction survey         survey completed in          70% satisfaction score in 70% satisfaction score in 70% satisfaction score in 70% satisfaction score in 70% satisfaction score in
(Text)                               2019-20.                     citizen feedback survey citizen feedback survey citizen feedback survey citizen feedback survey citizen feedback survey
Improved water supply and sewerage services
Percentage of water quality
samples meeting standards            98.00                        98.00                      98.00                      98.00                      98.00                      98.00
(Percentage) (Percentage)
Percentage of STP effluent
samples meeting standards            98.00                        98.00                      98.00                      98.00                      98.00                      98.00
(Percentage) (Percentage)

                                                                        Monitoring & Evaluation Plan: PDO Indicators
                                                                                                                                    Methodology for Data               Responsibility for Data
Indicator Name                                       Definition/Description                  Frequency       Datasource
                                                                                                                                    Collection                         Collection
                                                     A. SJPNL Board of Directors
                                                     or the MD cum CEO takes                                                        SJPNL will maintain a
                                                     all managerial and financial                                                   record of all the matters
                                                                                                             SJPNL M&E
SJPNL strengthened as an autonomous                  decisions.                   Annual                                            which are referred to              SJPNL.
                                                                                                             System.
WSS Company                                                                                                                         the GoHP for decisions.
                                                         (a) Managerial
                                                     decisions pertain to all
                                                     project management
                                        decisions, operational
                                        decisions, procurement
                                        decisions and HR policy
                                        decisions.

                                             (b) Financial decisions
                                        pertain to all financial
                                        management decisions and
                                        commercial decisions
                                        related to billing and
                                        collection, apart from tariff.


                                        The operational efficiency
                                        refers to energy efficiency
                                                                                          SJPNL achieves
                                        improvement, NRW                                                            SJPNL to maintain
                                                                                          operational efficiency
SJPNL achieves operational efficiency   reduction and                    Annual   SJPNL                             records and IVA to
                                                                                          and financial
and financial sustainability            improvement in O&M cost                                                     verify.
                                                                                          sustainability
                                        recovery (see sub-
                                        indicators).

                                                                                          Energy efficiency (KWH
                                                                                          /KL) in water supply is
                                                                                          the ratio of the energy
                                        Energy efficiency                                 consumed (KWH) for
                                        improvement for water                             water production and      SJPNL to maintain
                                        supply system refers to                           distribution to the       records and IVA to verify
SJPNL improves energy efficiency by                                      Annual   SJPNL
                                        reduction in per unit                             volume of water           as this indicator is also a
20%
                                        energy consumption for                            delivered (KL) to the     DLI.
                                        water delivered at the                            main balancing
                                        balancing reservoir                               reservoir.
                                                                                          The information on
                                                                                          energy consumption will
                                                                                          be based on electricity
bills for water
production and
distribution systems. The
information on volume
of water delivered for
distribution (KL) at the
main balancing reservoir
will be based on
measurement at the
outlet of main balancing
reservoir for the same
period. SJPNL will
update the data in the
M&E system, based on
which Energy Efficiency
will be calculated.
The total electricity bill
(in Rs) will be calculated
taking into consideration
the power costs, the
energy charges such as
demand charges, peak
hour charges and the
power factor. The total
electicity bill will be
divided by the unit rate
per KWH of energy for
normal hours as per
tariff order of Himachal
Pradesh Electricity
Regulatory Commission,
to get the equivalent
KWH for calculating
energy efficiency
                                                                                  The volume of water
                                                                                  delivered at the main
                                                                                  balancing reservoir will
                                                                                  be meaured at the inlet
                                                                                  of the main balancing
                                                                                  reservoir on daily basis.
                                                                                  The volume of water
                                                                                  billed to the consumers
                                     NRW will be calculated as                    will be measured by
                                     the ratio of volume of                       SJPNL on monthly basis
                                     water delivered at the                       through consumption
                                     main balancing reservoir                     meters.
                                     less volume of water billed                  Where consumption is
                                     to the consumers for the                     not metered, SJPNL will
                                     same period to the volume                    estimate consumption         SJPNL to maintain
                                     of water delivered at the                    on sample basis (thrice)     records and IVA to verify
SJPNL reduces Non-Revenue-Water by                               Annual   SJPNL
                                     main balancing reservoir in                  every year.                  as this indicator is also a
15%
                                     the same period. NRW                         SJPNL will establish the     DLI.
                                     reduction includes                           baseline for NRW in the
                                     reduction in (a) physical                    first year of the
                                     (or real) losses, (b)                        Program.
                                     commercial (or apparent)                     SJPNL will update the
                                     losses, and (c) unbilled                     data in the M&E system,
                                     authorized consumption in                    based on which
                                     water supply.                                NRW will be calculated.
                                                                                  IVA will verify the NRW
                                                                                  data recorded in the
                                                                                  M&E system on annual
                                                                                  basis. IVA will verify the
                                                                                  NRW data submitted by
                                                                                  the private operator to
                                                                                  SJPNL. In addition IVA
                                                                                  will verify on sample
                                                                           basis bulk water
                                                                           metering and consumer
                                                                           metering data available
                                                                           on the M & E system.

                             O&M Cost Recovery for
                             water distribution is
                             expressed as percentage of
                             revenue from water supply                     SJPNL will update both
                             to the cost of operating                      cost and revenue data in
                             and maintaining water                         the M&E system, based
                             distribution services.                        on which O & M cost
                             SJPNL’s revenue from                          recovery will be
                             water supply include                          calculated. SJPNL will
                             revenue from water supply                     segregate shared costs
                             in SMC area and revenue                       between bulk water
                             from supply of bulk water                     supply, water
                             to Jal Shakti Vibhag,                         distribution and sewage    SJPNL to maintain
                             commercial institutions                       services, in order to      records and IVA to verify
O&M Cost Recovery in water                                Annual   SJPNL
                             and other housing societies                   arrive at the cost of      as this indicator is also a
distribution
                             in peri urban areas of                        water distribution         DLI.
                             Shimla. SJPNL’s cost of                       Revenue for water
                             operating and maintaining                     supply will be obtained
                             water distribution system                     from M & E system and
                             include operator payments                     will exclude any revenue
                             (staff costs, salaries,                       for sewage services. IVA
                             overheads etc.), electricity                  will verify the O&M cost
                             costs, chemicals and                          recovery data recorded
                             consumables, repair and                       in the M&E system on
                             maintenance,                                  annual basis.
                             administrative expenses
                             etc. Cost of sewage
                             services and treated bulk
                             water supply to Shimla (till
                                    the balancing reservoir) are
                                    excluded. Revenue from
                                    sewage services is excluded
                                    This refers to the number                       SJPNL will maintain the
                                    of people benefiting from                       following records as a
                                    improved WSS services.                          part of its M&E system:
                                    This comprises of the                           1.       List of water
                                    following categories – (a)                      supply connections
                                    Residential population, and                     including any new
                                    (b) Tourist population.                         connections and
                                                                                    discontinued
                                    Improved WSS service                            connections on a
                                    refers to (a) Provision of                      monthly basis.
                                    continuous water supply,                        2.       Data on hours of
                                    and (b) Provision of                            water supplied at pre-
                                    functional sewerage                             determined
                                    connections.                                    measurement points in
                                                                                                              SJPNL to maintain
                                                                                    the network.
Number of people benefitting from                                  Annual   SJPNL                             records and IVA to
                                    (a)      Provision of                           3.       Number of
improved WSS services                                                                                         verify.
                                    continuous water supply                         tourists from the
                                    refers to a water supply                        Department of Tourism,
                                    connection providing water                      GoHP (on an annual
                                    supply for at least 20 hours                    basis)
                                    a day, for a minimum of                         4.       List of sewerage
                                    330 days in the year. This                      connections including
                                    would also apply to new                         any new connections on
                                    connections providing at                        a monthly basis.
                                    least 30 days of continuous                     IVA will verify the data
                                    water supply.                                   recorded in the M&E
                                                                                    system on annual basis.
                                    (b)     Provision of a                          In addition, IVA will
                                    functional sewerage                             verify the data on water
                                    connections refers to a                         supply and sewerage
                                    sewerage connection                             connections from the
                                        which is connected to a                   billing and collection
                                        sewerage network                          software, data on hours
                                                                                  of water supply from the
                                                                                  DMA operator/ SJPNL
                                                                                  manager and data on
                                                                                  tourists from
                                                                                  information published
                                                                                  by Department of
                                                                                  Tourism.

                                                                                  1.     Data on
                                                                                         pressure and
                                                                                         hours of water
                                                                                         supply at pre-
                                                                                         determined
                                                                                         measurement
                                        Continuous water supply                          points in the
                                        refers to water supplied for                     distribution
                                        at least 20 hours a day, for                     network.
                                        a minimum of 330 days in                  2.     Number of
                                                                                                             SJPNL to maintain
                                        the year. This would also                        connections
                                                                                                             records and IVA to verify
(i) Number of people having access to   apply to new connections Annual   SJPNL          serving resident
                                                                                                             as this indicator is also a
continuous water supply                 providing at least 30 days                       and tourist
                                                                                                             DLI.
                                        of continuous water                              population.
                                        supply. Number of people                  3.     Number of
                                        benefitting will include                         people
                                        both resident and tourist                        benefitting from
                                        population.                                      continuous
                                                                                         water supply
                                                                                         including
                                                                                         residents and
                                                                                         tourists.
                                                                                  Each water connection is
                                                                                  assumed to benefit 98
                                                                                  residents and tourists
                                                                                  IVA will review data
                                                                                  from the M&E system,
                                                                                  billing and collection
                                                                                  system
                                                                                  and independent audit
                                                                                  reports of Operator
                                                                                  performance.

                                   Access to sewerage                             SJPNL will maintain the
                                   services refers to a                           following records as a
                                   sewerage connection                            part of its M&E system:
                                   which is connected to the                      1.       Number of
                                   sewerage network. A new                                 sewerage
                                   connection would count                                  connections
                                   towards achievement if it                               including any
                                   has been provided with                                  new connections
                                   sewerage services for at                                on a monthly
                                   least 30 days in the year.                              basis serving
                                   Number of people                                        both resident       SJPNL to maintain
                                   benefitting from sewerage                               and tourist         records and IVA to verify
(ii) Number of additional people                                 Annual   SJPNL
                                   services will include both                              population.         as this indicator is also a
provided with sewerage services.
                                   resident and tourist                           2.       Number of           DLI.
                                   population.                                             people having
                                                                                           access to
                                   While there are 2.04                                    sewerage
                                   million people benefiting                               services.
                                   from existing sewerage                         3.       Day-wise record
                                   services at present, the                                of sewage
                                   baseline and annual targets                             volumes
                                   refer to the cumulative                                 received at STPs.
                                   number of additional                           Each sewerage
                                   people provided with                           connection is assumed
                                   sewerage services (i.e. 0                      to benefit 98 residents
                                              additional people at                                      and tourists
                                              baseline rising up to a total                             IVA will verify the
                                              cumulative target of                                      records on the number
                                              1,360,000 additional                                      of people benefitting
                                              persons benefitting from                                  from sewerage services
                                              sewerage services under                                   as per the M&E
                                              the project). Under these                                 system. IVA will verify
                                              targets, each year 272,000                                the records from the
                                              new people would gain                                     billing and collection
                                              access to sewerage                                        software. IVA will verify
                                              services.                                                 the records of the
                                                                                                        volume of sewage
                                                                                                        received at STP through
                                                                                                        the M & E system to
                                                                                                        confirm the additional
                                                                                                        flow of sewage into
                                                                                                        STPs.
.
                             .
                                                   Monitoring & Evaluation Plan: Intermediate Results Indicators
                                                                                                        Methodology for Data        Responsibility for Data
    Indicator Name                            Definition/Description          Frequency   Datasource
                                                                                                        Collection                  Collection
                                              1. SJPNL will obtain                                      SJPNL will use the
                                              approval from BoD and                                     performance incentive
                                              implement a policy for                                    policy for staff approved
                                              performance linked                                        by the BoD. SJPNL will
    At least 80% of SJPNL employees receive   incentive for managers,                                   maintain the records of     SJPNL to maintain
                                                                           Annual         SJPNL
    incentives as per the performance         engineers, and executives.                                the meeting of the          records
    incentive policy.                         The policy will include: (a)                              Board in form of minutes
                                              Corpus of funds available                                 of the meeting. The HR
                                              to SJPNL for distribution as                              Department of SJPNL
                                              performance linked                                        will maintain the records
                                              Incentive, and                                            on implementation of
methodology for                policy. The HR
calculating this corpus; (b)   Department of SJPNL
Eligibility and normative      will prepare annual
allocation of the corpus       report on performance
towards individual             evaluation of
employees including on-roll    employees. HR
and contractual                Department of SJPNL
employees; (c)                 will verify the total
Performance targets to be      number of employees to
met by each employee; (d)      whom the performance
Methodology, including         incentive policy is
individual performance,        applicable and verify the
unit performance, and          number of employees
SJPNL performance; (e)         who have received the
Linkage between                performance incentive.
performance evaluation         Repeat instances of an
and the incentive payable      employee receiving
to the employee; (f)           performance incentive is
Procedure for grievance        eligible to be counted
redressal related to           separately towards
performance incentive.         achievement.
2. SJPNL will prepare
annual report on
performance evaluation of
employees providing
details of (a) corpus
available for distribution,
(b) normative allocation of
corpus to each employee,
(c) performance score of
each employee, and (d)
incentive distributed to the
employee based on
performance score.
                                       During the Program period,
                                       at least 80% of the number
                                       of employees to whom the
                                       performance incentive
                                       policy is applicable should
                                       have received performance
                                       incentive as per the
                                       performance incentive
                                       policy and evaluation.
                                                                                       SJPNL will increase the
                                                                                       share of contractual
                                                                                       women employees
                                       This indicator refers to the
                                                                                       working in SJPNL. SJPNL
                                       percentage share of                                                        SJPNL to maintain
At least 30% women employed as                                        Annual   SJPNL   will report using the
                                       women employees to the                                                     records.
contractual staff in SJPNL.                                                            data provided by the HR
                                       total contractual
                                                                                       Department of SJPNL
                                       employees in SJPNL.
                                                                                       across all functions of
                                                                                       SJPNL

                                       Performance based                               SJPNL will enter into a
                                       contract is an agreement or                     performance-based
                                       contract signed between                         contract for water
                                       SJPNL and a private                             supply distribution with   As this is also a DLI, IVA
                                       operator for achieving a                        a private operator.        will verify the agreement
                                       specified level of                              Contract to                signed with the private
SJPNL implements performance-based     performance which will                          include service delivery   operators and confirm
                                                                    Annual     SJPNL
payments to the private water supply   include service delivery                        standards listed above .   that service delivery
operator                               standards for (a) continuity                    SJPNL will carry out an    standards listed above
                                       of water supply, (b) NRW,                       annual performance         are included in the
                                       (c) metering and billing,                       audit of the operator      contract.
                                       and (d) grievance redressal.                    through an independent
                                                                                       agency. The scope of the
                                       The operator’s                                  audit will be as per the
                                       remuneration will be linked                     terms of the contract
                                       to performance in the                       and will include
                                       above mentioned areas                       verification of annual
                                       and the performance of the                  performance targets of
                                       operator will be audited                    the Operator.
                                       through an independent                      SJPNL is expected to
                                       agency as per the contract.                 complete at least three
                                                                                   annual performance
                                                                                   audits during the
                                                                                   Program period.

                                       The 5-year business plan
                                       comprises of the following:
                                       (a)      Service Delivery
                                       Improvement targets
                                       (b)      Operational
                                       Efficiency (Energy
                                       Efficiency & NRW control)
                                       targets                                     SJPNL will prepare a five
                                       (c)      Capital Investment                 - year Business plan
                                       Plan                                        which will be approved
                                       (d)      Organizational                     and adopted by the BoD
Five-year business plan approved and   Structure and Annual Staff Annual   SJPNL   SJPNL will maintain the     SJPNL
adopted                                Plan                                        records of the meeting
                                       (e)      Revenue                            of the Board on the
                                       projections including year                  business plan in form of
                                       wise projected tariff and                   minutes of the meeting.
                                       demand
                                       (f)      Cash flow
                                       projections with cost
                                       Recovery & subsidy
                                       requirements
                                       (g)      Systems for
                                       financial Management,
                                       Customer Grievance
                                         Redressal and M&E.
                                         (h)     Capacity building
                                         plan
                                         (i)     Commitments from
                                         stakeholders for financial
                                         support


                                         SJPNL will develop a HR                 Approved
HR policies reviewed and revised to                                                             Review of Approved
                                         gender policy to promote     Annual     SJPNL HR                                SJPNL
promote gender equality in the                                                                  SJPNL HR Policy
                                         gender equality in the                  Policy
workplace
                                         workplace.
                                                                                                SJPNL will maintain
                                                                                                records of grievance
                                                                                                redressal in its M&E
                                                                                                system, including (a)
                                                                                                time of grievance, (b)
                                                                                                category of grievance,
                                                                                                (c) time taken for
                                         The grievance redressal                                redressal as per SJPNL
                                                                                 SJPNL to
                                         mechanism will be part of                              records, (d) time of
                                                                                 maintain
                                         the M&E system of SJPNL.                               confirmation of
                                                                                 records of                              SJPNL to maintain
SJPNL redresses at least 90% WSS         It will include the time limit Annual                  redressal by cross
                                                                                 grievance                               records in M&E System.
grievances within the specified period   for redressal for various                              verification with a
                                                                                 redressal in
                                         categories of grievances as                            sample of customers,
                                                                                 M&E system.
                                         per the citizen’s charter for                          and (e) status of
                                         SJPNL.                                                 grievances outstanding
                                                                                                or closed without
                                                                                                redressal. The annual
                                                                                                report of SJPNL will
                                                                                                contain a grievance
                                                                                                redressal report
                                                                                                disclosing the
                                                                                                percentage of grievances
                                                                                           redressed within 24
                                                                                           hours as per stipulated
                                                                                           time period.


                                                                                           SJPNL will maintain the
                                                                                           following records as a
                                                                                           part of its M&E system:
                                                                                           1.       List of water
                                           24 / 7 customers defined as
                                                                                                    supply
                                           customers having access to
                                                                                                    connections
                                           continuous water supply.
                                                                                                    including any
                                                                                                    new connections
                                           Provision of continuous
                                                                                                    and
                                           water supply refers to a
                                                                                                    discontinued
                                           water supply connection
                                                                                                    connections, on
                                           providing water supply for
                                                                                                    a monthly basis.
                                           at least 20 hours a day, for                                                 SJPNL to maintain
                                                                                           2.       Data on hours of
                                           a minimum of 330 days in                                                     records in M&E system
                                                                                                    water supplied
Percentage of 24 / 7 customers billed on   the year. This would also      Annual   SJPNL                                on percentage of 24 / 7
                                                                                                    at pre-
volumetric basis                           apply to new connections                                                     customers billed on
                                                                                                    determined
                                           providing at least 30 days                                                   volumetric basis.
                                                                                                    measurement
                                           of continuous water
                                                                                                    points in the
                                           supply.
                                                                                                    network.
                                                                                           3.       Number of
                                           The percentage of
                                                                                                    connections
                                           connections billed on
                                                                                                    billed on
                                           volumetric basis will be
                                                                                                    volumetric basis.
                                           considered for measuring
                                                                                           SJPNL will maintain the
                                           this indicator
                                                                                           data on billing and
                                                                                           collection from water
                                                                                           supply connections in
                                                                                           the billing and collection
                                                                                           software and M&E
                                                                                              system.
                                                                                              IVA will verify the
                                                                                              percentage of customers
                                                                                              billed on volumetric
                                                                                              basis through the billing
                                                                                              & collection software
                                                                                              and the M & E system

                                        Satisfaction score is
                                        measured through citizen
                                        feedback survey conducted
                                        by SJPNL annually to
                                        determine the current
                                        levels of WSS service
                                        quality and citizen
                                        satisfaction. The survey
                                                                                              SJPNL will publish the
                                        would focus on (a) access
                                                                               Satisfaction   methodology for citizen
                                        to water supply and
                                                                               Survey         satisfaction survey and
SJPNL scores at least 70% in customer   sewerage services, (b)        Annual                                              SJPNL
                                                                               implemented    disclose the results
satisfaction survey                     water quality and quantity,
                                                                               by SJPNL       publicly.
                                        (c) reliability and
                                        affordability, (d) customer
                                        service related to WSS
                                        services, and (e) willingness
                                        to use e-services. Citizen
                                        satisfaction would be
                                        measured based on a scale
                                        of 1-10, with 1 indicating
                                        lowest satisfaction and 10
                                        indicating full satisfaction.
                                        Water quality samples                                 The water distribution
                                                                                                                          SJPNL to maintain
Percentage of water quality samples     meeting standards refer to Annual      SJPNL          operator appointed by
                                                                                                                          records in M&E system.
meeting standards (Percentage)          the number of water                                   SJPNL under the
                                        quality samples meeting                               performance based
                                         the drinking water quality                  contract will maintain
                                         standards specified in                      the day-wise record of
                                         CPHEEO Guidelines and IS:                   the quality of water
                                         10500.                                      supplied at various
                                                                                     locations of the water
                                                                                     supply network and the
                                                                                     same will be recorded in
                                                                                     the M&E system.
                                                                                     SJPNL will verify the
                                                                                     quality of water supplied
                                                                                     based on the reports
                                                                                     submitted by the
                                                                                     operator for the
                                                                                     performance standard
                                                                                     compliance and
                                                                                     independent tests
                                                                                     carried out by SJPNL.

                                                                                     The operator of the STP
                                                                                     will maintain day-wise
                                                                                     record of the treated
                                                                                     effluent quality
                                         STP effluent samples                        standards and the same
                                         meeting standards refer to                  will be recorded in the
                                         the number of STP effluent                  M&E system.              SJPNL to maintain
    Percentage of STP effluent samples                              Annual   SJPNL
                                         quality samples meeting                     SJPNL will verify the    records in M&E system.
    meeting standards (Percentage)
                                         the effluent quality                        quality of treated
                                         standards specified in                      effluent based on the
                                         CPHEEO Guidelines.                          reports submitted by the
                                                                                     operator and
                                                                                     independent tests
                                                                                     carried out by SJPNL.
.
                   ANNEX 3. DISBURSEMENT LINKED INDICATORS, DISBURSEMENT ARRANGEMENTS AND VERIFICATION PROTOCOLS
.
                                                        Disbursement Linked Indicators Matrix
DLI_T BL_MATRI X




    DLI 1                    SJPNL implements performance-based payments to the private water supply operator

    Type of DLI              Scalability                  Unit of Measure     Total Allocated Amount (USD)   As % of Total Financing Amount

    Output                   No                           Text                                        18.80 12.00
    Period                   Value                                                  Allocated Amount (USD) Formula
Baseline                    Performance based contract for intra city water
                            distribution under preparation

Year 1                      Yes                                                                       10.60 10.6 Mn USD on signing of the
                                                                                                            performance based contract

Year 2                      Yes                                                                        4.10 4.1 Mn USD on completion of
                                                                                                            performance audit of the Operator
                                                                                                            through an independent agency

Year 3                      Yes                                                                        4.10 4.1 Mn USD on completion of
                                                                                                            performance audit of the Operator
                                                                                                            through an independent agency

Year 4                      No                                                                         0.00 0.00

Year 5                      No                                                                         0.00 0.00
DLI_T BL_MATRI X




 DLI 2             SJPNL improves energy efficiency in water supply by 20%

 Type of DLI       Scalability                  Unit of Measure      Total Allocated Amount (USD)   As % of Total Financing Amount

 Outcome           Yes                          Text                                         19.20 12.00
 Period            Value                                                     Allocated Amount (USD) Formula
Baseline           Energy consumption is 13 KWH per KL of water
                   delivered at the balancing reservoir.

Year 1             12.5 KWH per KL                                                            3.70 7.4 mn USD for every unit reduction
                                                                                                   in KWH per KL of water delivered at
                                                                                                   the balancing reservoir relative to
                                                                                                   the preceding year

Year 2             12.0 KWH per KL                                                            3.70 7.4 mn USD for every unit reduction
                                                                                                   in KWH per KL of water delivered at
                                                                                                   the balancing reservoir relative to
                                                                                                   the preceding year

Year 3             11.5 KWH per KL                                                            3.70 7.4 mn USD for every unit reduction
                                                                                                   in KWH per KL of water delivered at
                                                                                                   the balancing reservoir relative to
                                                                                                   the preceding year

Year 4             11.0 KWH per KL                                                            3.70 7.4 mn USD for every unit reduction
                                                                                                   in KWH per KL of water delivered at
                                                                                                   the balancing reservoir relative to
                                                                                                   the preceding year

Year 5             10.4 KWH per KL                                                            4.40 7.4 mn USD for every unit reduction
                                                                                                   in KWH per KL of water delivered at
                                                                                                   the balancing reservoir relative to
                                                                                                   the preceding year
DLI_T BL_MATRI X




 DLI 3             SJPNL reduces Non-Revenue-Water by 15%

 Type of DLI       Scalability                       Unit of Measure    Total Allocated Amount (USD)   As % of Total Financing Amount

 Outcome           Yes                               Text                                       19.20 12.00
 Period            Value                                                      Allocated Amount (USD) Formula
Baseline           To be determined in the first year

Year 1             Baseline determined                                                           0.00 0.00

Year 2             3.75% below baseline                                                          4.80 US$ 1.28 mn for each additional 1%
                                                                                                      reduction in NRW

Year 3             7.5% below baseline                                                           4.80 US$ 1.28 mn for each additional 1%
                                                                                                      reduction in NRW

Year 4             11.25% below baseline                                                         4.80 US$ 1.28 mn for each additional 1%
                                                                                                      reduction in NRW

Year 5             15% below baseline                                                            4.80 US$ 1.28 mn for each additional 1%
                                                                                                      reduction in NRW
DLI_T BL_MATRI X




 DLI 4             SJPNL indexes tariff annually as per tariff policy

 Type of DLI       Scalability                       Unit of Measure    Total Allocated Amount (USD)   As % of Total Financing Amount

 Process           No                                Text                                       19.20 12.00
 Period            Value                                                      Allocated Amount (USD) Formula
Baseline           Tariff indexed on April 1, 2019

Year 1             Yes                                                                           3.84 3.84 mn USD if SJPNL indexes tariff
                                                                                                      annually as per tariff policy
Year 2             Yes                                                                        3.84 3.84 mn USD if SJPNL indexes tariff
                                                                                                   annually as per tariff policy

Year 3             Yes                                                                        3.84 3.84 mn USD if SJPNL indexes tariff
                                                                                                   annually as per tariff policy

Year 4             Yes                                                                        3.84 3.84 mn USD if SJPNL indexes tariff
                                                                                                   annually as per tariff policy

Year 5             Yes                                                                        3.84 3.84 mn USD if SJPNL indexes tariff
                                                                                                   annually as per tariff policy
DLI_T BL_MATRI X




 DLI 5             SJPNL achieves at least 175% O&M Cost Recovery in water distribution.

 Type of DLI       Scalability                  Unit of Measure      Total Allocated Amount (USD)   As % of Total Financing Amount

 Outcome           Yes                          Text                                         19.20 12.00
 Period            Value                                                    Allocated Amount (USD) Formula
Baseline           O&M Cost Recovery for water distribution is
                   120%

Year 1             131%                                                                       3.84 US$ 349,091 for each percentage
                                                                                                   improvement in O & M cost
                                                                                                   recovery in water distribution

Year 2             142%                                                                       3.84 US$ 349,091 for each percentage
                                                                                                   improvement in O & M cost
                                                                                                   recovery in water distribution

Year 3             153%                                                                       3.84 US$ 349,091 for each percentage
                                                                                                   improvement in O & M cost
                                                                                                   recovery in water distribution

Year 4             164%                                                                       3.84 US$ 349,091 for each percentage
                                                                                                     improvement in O & M cost
                                                                                                     recovery in water distribution

Year 5             175%                                                                        3.84 US$ 349,091 for each percentage
                                                                                                    improvement in O & M cost
                                                                                                    recovery in water distribution
DLI_T BL_MATRI X




 DLI 6             SJPNL receives an annual performance score of at least 3 out of 5

 Type of DLI       Scalability                   Unit of Measure      Total Allocated Amount (USD)   As % of Total Financing Amount

 Output            No                            Text                                         16.00 10.00
 Period            Value                                                     Allocated Amount (USD) Formula
Baseline           Annual Performance Score of 3 out of 5

Year 1             SJPNL receives an annual performance score of at                            3.20 US$ 3.2 mn if SJPNL receives an
                   least 3 out of 5                                                                 annual performance score of at
                                                                                                    least 3 out of 5

Year 2             SJPNL receives an annual performance score of at                            3.20 US$ 3.2 mn if SJPNL receives an
                   least 3 out of 5                                                                 annual performance score of at
                                                                                                    least 3 out of 5

Year 3             SJPNL receives an annual performance score of at                            3.20 US$ 3.2 mn if SJPNL receives an
                   least 3 out of 5                                                                 annual performance score of at
                                                                                                    least 3 out of 5

Year 4             SJPNL receives an annual performance score of at                            3.20 US$ 3.2 mn if SJPNL receives an
                   least 3 out of 5                                                                 annual performance score of at
                                                                                                    least 3 out of 5

Year 5             SJPNL receives an annual performance score of at                            3.20 US$ 3.2 mn if SJPNL receives an
                   least 3 out of 5                                                                 annual performance score of at
                                                                                                    least 3 out of 5
DLI_T BL_MATRI X




 DLI 7             Number of people benefitting from improved WSS services

 Type of DLI       Scalability                 Unit of Measure     Total Allocated Amount (USD)   As % of Total Financing Amount

 Outcome           Yes                         Text                                        48.00 30.00
 Period            Value                                                  Allocated Amount (USD) Formula
Baseline           see sub indicators

Year 1             see sub indicators                                                       3.20 see sub indicators

Year 2             see sub indicators                                                       8.65 see sub indicators

Year 3             see sub indicators                                                      10.35 see sub indicators

Year 4             see sub indicators                                                      12.05 see sub indicators

Year 5             see sub indicators                                                      13.75 see sub indicators
DLI_T BL_MATRI X




 DLI 7.1           Number of people having access to continuous water supply

 Type of DLI       Scalability                 Unit of Measure     Total Allocated Amount (USD)   As % of Total Financing Amount

 Outcome           Yes                         Number                                      32.00 20.00
 Period            Value                                                  Allocated Amount (USD) Formula
Baseline           0.00

Year 1             0.00                                                                     0.00 -

Year 2             850,000.00                                                               5.45 US$6.4118 per person with new
                                                                                                 access to continuous water supply +
                                                                                                 US$2 per person with maintained
                                                                                                 access from previous year(s)
Year 3             1,700,000.00                                                              7.15 US$6.4118 per person with new
                                                                                                  access to continuous water supply +
                                                                                                  US$2 per person with maintained
                                                                                                  access from previous year(s)

Year 4             2,550,000.00                                                              8.85 US$6.4118 per person with new
                                                                                                  access to continuous water supply +
                                                                                                  US$2 per person with maintained
                                                                                                  access from previous year(s)

Year 5             3,400,000.00                                                             10.55 US$6.4118 per person with new
                                                                                                  access to continuous water supply +
                                                                                                  US$2 per person with maintained
                                                                                                  access from previous year(s)
DLI_T BL_MATRI X




 DLI 7.2           Number of additional people provided with sewerage services

 Type of DLI       Scalability                 Unit of Measure      Total Allocated Amount (USD)   As % of Total Financing Amount

 Outcome           Yes                         Number                                       16.00 10.00
 Period            Value                                                  Allocated Amount (USD) Formula
Baseline           0.00

Year 1             272,000.00                                                                3.20 11.764 US$ per additional person
                                                                                                  provided with sewage services
                                                                                                  compared to prior project year

Year 2             544,000.00                                                                3.20 11.764 US$ per additional person
                                                                                                  provided with sewage services
                                                                                                  compared to prior project year

Year 3             816,000.00                                                                3.20 11.764 US$ per additional person
                                                                                                  provided with sewage services
                              compared to prior project year

Year 4   1,088,000.00   3.20 11.764 US$ per additional person
                             provided with sewage services
                             compared to prior project year

Year 5   1,360,000.00   3.20 11.764 US$ per additional person
                             provided with sewage services
                             compared to prior project year
.
.
                                               Verification Protocol Table: Disbursement Linked Indicators
    DLI_T BL_VERIFICATI ON




    DLI 1                    SJPNL implements performance-based payments to the private water supply operator
                             Performance based contract is an agreement or contract signed between SJPNL and a private operator for achieving a
                             specified level of performance which will include service delivery standards for (a) continuity of water supply, (b) NRW, (c)
    Description
                             metering and billing, and (d) grievance redressal. The operator’s remuneration will be linked to performance in the above
                             mentioned areas and the performance of the operator will be audited through an independent agency as per the contract.
    Data source/ Agency      SJPNL

    Verification Entity      IVA
                             SJPNL will enter into a performance-based contract for water supply distribution with a private operator. IVA will verify the
                             agreement signed with the private operators and confirm that service delivery standards listed above are included in the
    Procedure
                             contract.
    DLI_T BL_VERIFICATI ON




    DLI 2                    SJPNL improves energy efficiency in water supply by 20%
                             Energy efficiency improvement for water supply system refers to reduction in per unit energy consumption per KL of water
    Description
                             delivered at the balancing reservoir.
    Data source/ Agency      SJPNL

    Verification Entity      IVA
                             Energy efficiency (KWH /KL) in water supply is the ratio of the energy consumed (KWH) for water production and
                             distribution to the volume of water delivered (KL) to the main balancing reservoir.
                             The information on energy consumption will be based on electricity bills for water production and distribution systems. The
                             information on volume of water delivered for distribution (KL) at the main balancing reservoir will be based on
                             measurement at the outlet of main balancing reservoir for the same period. SJPNL will update the data in the M&E system,
    Procedure                based on which Energy Efficiency will be calculated.
                             The total electricity bill (in Rs) will be calculated taking into consideration the power costs, the energy charges such as
                             demand charges, peak hour charges and the power factor. The total electicity bill will be divided by the unit rate per KWH
                             of energy for normal hours as per tariff order of Himachal Pradesh Electricity Regulatory Commission, to get the equivalent
                             KWH for calculating energy efficiency.
                             SJPNL will update the data in the M&E system, based on which Energy Efficiency will be calculated.
                         IVA will verify the data recorded in the M&E system on annual basis. In addition, IVA will verify the Energy Efficiency data
                         submitted by the private operator to SJPNL.
                         In any year, the reduction achieved will be calculated taking the lowest of the annual average energy consumption achieved
                         in any of the earlier years as the reference point. Evaluation will be done once in a year.
                         Any shortfall or excess achievement can be adjusted in subsequent years subject to the overall cap for the DLI.
                         The cumulative disbursement in all years will not exceed the total disbursement allocated for the DLI.




DLI_T BL_VERIFICATI ON




DLI 3                    SJPNL reduces Non-Revenue-Water by 15%
                         NRW will be calculated as the ratio of volume of water delivered at the main balancing reservoir less volume of water billed
                         to the consumers for the same period to the volume of water delivered at the main balancing reservoir in the same period.
                         NRW reduction includes reduction in (a) physical (or real) losses, (b) commercial (or apparent) losses, and (c) unbilled
Description
                         authorized consumption in water supply. Billed authorised consumption will include billed water supply to the SMC area
                         and billed bulk water supplied to Jal Sahkti Vibhag, commercial institutions and other housing societies in peri urban areas
                         of Shimla.
Data source/ Agency      SJPNL

Verification Entity      IVA
                         The volume of water delivered at the main balancing reservoir will be meaured at the inlet of the main balancing reservoir
                         on daily basis. The volume of water billed to the consumers will be measured by SJPNL on monthly basis through
                         consumption meters. Where consumption is not metered, SJPNL will estimate consumption on sample basis (thrice) every
                         year.
                         SJPNL will establish the baseline for NRW in the first year of the Program.
                         SJPNL will update the data in the M&E system, based on which NRW will be calculated.
Procedure
                         IVA will verify the NRW data recorded in the M&E system on annual basis. IVA will verify the NRW data submitted by the
                         private operator to SJPNL. In addition IVA will verify on sample basis bulk water metering and consumer metering data
                         available on the M & E system.
                         In any year, the reduction achieved will be calculated taking the lowest of the annual average NRW achieved in any of the
                         earlier years as the reference point. Evaluation will be done once in a year.
                         Any shortfall or excess achievement can be adjusted in subsequent years subject to the overall cap for the DLI.
                         The cumulative disbursement in all years will not exceed the total disbursement allocated for the DLI.

DLI_T BL_VERIFICATI ON




DLI 4                    SJPNL indexes tariff annually as per tariff policy
Description              Tariff will be indexed annually based on SJPNL’s tariff indexation policy.

Data source/ Agency      SJPNL

Verification Entity      IVA
                         SJPNL will implement the policy for annual tariff indexation as per the approved Cost Recovery, Tariff and Subsidy Policy.
                         SJPNL will maintain the record of government notification on tariff indexation.
                         IVA will verify that the tariff has been indexed as per the approved Cost Recovery, Tariff and Subsidy Policy annually and
Procedure
                         also verify SJPNL’s notification on effective tariff rates. IVA will verify from the M & E system and billing and collection
                         software that the indexed tariff has been applied in the water bills.
DLI_T BL_VERIFICATI ON




DLI 5                    SJPNL achieves at least 175% O&M Cost Recovery in water distribution.
                         O&M Cost Recovery for water distribution is expressed as percentage of revenue from water supply to the cost of operating
                         and maintaining water distribution services. SJPNL’s revenue from water supply include revenue from water supply in SMC
                         area and revenue from supply of bulk water to Jal Shakti Vibhag, commercial institutions and other housing societies in peri
Description              urban areas of Shimla. SJPNL’s cost of operating and maintaining water distribution system include operator payments (staff
                         costs, salaries, overheads etc), electricity costs, chemicals and consumables, repair and maintenance, administrative
                         expenses etc. Cost of sewage services and treated bulk water supply to Shimla (till the balancing reservoir) are excluded.
                         Revenue from sewage services is excluded.
Data source/ Agency      SJPNL

Verification Entity      IVA
                         SJPNL will update both cost and revenue data in the M&E system, based on which O & M cost recovery will be calculated.
                         SJPNL will segregate shared costs between bulk water supply, water distribution and sewage services, in order to arrive at
Procedure                the cost of water distribution.
                         Revenue for water supply will be obtained from M & E system and will exclude any revenue for sewage services.
                         IVA will verify the O&M cost recovery data recorded in the M&E system on annual basis
DLI_T BL_VERIFICATI ON




DLI 6                    SJPNL receives an annual performance score of at least 3 out of 5
                         The performance score is evaluated based on a methodology that covers the following key aspects of utility performance:
Description              (a) Customer Service (30%); (b) Efficiency (20%); (c) Organizational Systems (20%); (d) Completion of Capital Investment
                         Plan (30%). SJPNL will receive an annual performance score between 1 and 5 based on these criteria .
Data source/ Agency      The Independent Directors on the Board of SJPNL will lead the evaluation process with subsequent verification by the IVA.

Verification Entity      The IVA will verify the score and its justification.
                         Annual evaluation of SJPNL's performance based on set criteria resulting in a score between 1 (lowest) to 5 (highest).
                         Methodology components (Customer Service, Efficiency, Organizational Systems, Completion of Capital Investment Plan)
Procedure                will be informed by the SJPNL M&E system as well as key associated documents SJPNL will publish and disclose, including
                         audited financial statements, corporate governance compliance report, citizen report card and overall Annual Report.
DLI_T BL_VERIFICATI ON




DLI 7                    Number of people benefitting from improved WSS services
                         This refers to the number of people benefiting from improved WSS services. This comprises of the following categories – (a)
                         Residential population, and (b) Tourist population. Improved WSS service refers to (a) Provision of continuous water supply,
                         and (b) Provision of functional sewerage connections. (a) Provision of continuous water supply refers to a water supply
Description
                         connection providing water supply for at least 20 hours a day, for a minimum of 330 days in the year. This would also apply
                         to new connections providing at least 30 days of continuous water supply. (b) Provision of a functional sewerage
                         connections refers to a sewerage connection which is connected to a sewerage network
Data source/ Agency      see sub indicators
Verification Entity      see sub indicators
                         see sub indicators
Procedure
DLI_T BL_VERIFICATI ON




DLI 7.1                  Number of people having access to continuous water supply
                         Continuous water supply refers to water supplied for at least 20 hours a day, for a minimum of 330 days in the year. This
Description              would also apply to new connections providing at least 30 days of continuous water supply. Number of people benefitting
                         will include both resident and tourist population. In the formula, "New Access" refers to persons newly provided with access
                         to continuous water supply in the respective year while "maintained access from previous year(s)" refers to persons still
                         benefitting from functional access to continued water supply from connections established under the project in prior years
Data source/ Agency      SJPNL

Verification Entity      IVA
                         SJPNL will maintain the following records as a part of its M&E system:
                             a. Data on pressure and hours of water supply at pre-determined measurement points in the distribution network.
                             b. Number of connections serving resident and tourist population.
                             c. Number of people benefitting from continuous water supply including residents and tourists.
                         Each water connection is assumed to benefit 98 residents and tourists
Procedure
                         IVA will review data from the M&E system, billing and collection system and independent audit reports of Operator
                         performance.
                         Any shortfall or excess achievement can be adjusted in subsequent years subject the overall cap for the DLI.
                         The cumulative disbursement in all years will not exceed the total disbursement allocated for the DLI.
DLI_T BL_VERIFICATI ON




DLI 7.2                  Number of additional people provided with sewerage services
                         Access to sewerage services refers to a sewerage connection which is connected to the sewerage network. A new
                         connection would count towards achievement if it has been provided with sewerage services for at least 30 days in the
Description              year. Number of people benefitting from sewerage services will include both resident and tourist population. As per the
                         formula, disbursements are linked to additional persons provided with sewage services compared to the prior project year
                         i.e. 272,000 per year under targeted values.
Data source/ Agency      SJPNL

Verification Entity      IVA
                          SJPNL will maintain the following records as a part of its M&E system:
                         1.       Number of sewerage connections including any new connections on a monthly basis serving both resident and
                                  tourist population.
Procedure                2.       Number of people having access to sewerage services.
                         3.       Day-wise record of sewage volumes received at STPs.
                         Each sewerage connection is assumed to benefit 98 residents and tourists
                         IVA will verify the records on the number of people benefitting from sewerage services as per the M&E system. IVA will
    verify the records from the billing and collection software. IVA will verify the records of the volume of sewage received at
    STP through the M & E system to confirm the additional flow of sewage into STPs.
    Any shortfall or excess achievement can be adjusted in subsequent years subject the overall cap for the DLI.
    The cumulative disbursement in all years will not exceed the total disbursement allocated for the DLI.

.