E4114v2 China: Anhui Xuancheng Infrastructure for Industrial Relocation Project Environmental Management Plan (EMP) Xuancheng Economic and Technological Zone Management Committee Anhui Academy of Environmental Science Research November 2012 I Table of contents Table of contents ........................................................................................................................ - 1 - 1 Overview ............................................................................................................................. - 2 - 1.1. Project Description.............................................................................................. - 3 - 1.2. The EMP Objectives ........................................................................................... - 1 - 1.3. The EMP Structure ............................................................................................. - 1 - 2 Legal and Regulation Framework .................................................................................... - 1 - 3 Environmental and Social Baselines ................................................................................ - 5 - 3.1. Environmental Characteristics of XEDTZ2 ..................................................... - 5 - 3.2. Resource and Environment Limit...................................................................... - 5 - 3.3 Functional Zoning of Regional Environment ............................................................ - 5 - 3.4 Environmental Quality ................................................................................................ - 6 - 4 Environment Management Roles and Responsibilities .................................................. - 7 - 4.1. Agencies and Institutions Involved in the Environmental Management ....... - 7 - 4.2. Environmental Management Responsibilities During Construction .............. - 8 - 4.3. Management of Contractor(s) .......................................................................... - 13 - 5 Environmental Impact and Mitigation Measures ......................................................... - 14 - 6 Supervision and Monitoring Plan................................................................................... - 36 - 6.1. Supervision for Environmental Management................................................. - 36 - 6.2. Environmental Management Monitoring ....................................................... - 39 - 6.3. Environmental Monitoring Plan ...................................................................... - 39 - 7 Contractor Environmental Specifications ..................................................................... - 43 - 7.1. Contractor’s Environmental Protection Plan ................................................. - 43 - 7.2. Site Facilities ...................................................................................................... - 43 - 7.3. Code of Conduct ................................................................................................ - 44 - 7.4. Health and Safety .............................................................................................. - 45 - 7.5. Storage of Fuel, Oils, Dangerous and Toxic Materials ................................... - 46 - 7.6. Waste Management ........................................................................................... - 46 - 7.7. Wastewater and Storm Water Managemen .................................................... - 47 - 7.8. Control of Noise ................................................................................................. - 47 - 7.9. Construction Stage Public Information Communication .............................. - 47 - 7.10. Physical Cultural Resources ............................................................................. - 48 - 8 Water and Soil Conservation Plan ................................................................................. - 49 - 8.1. Construction tender .......................................................................................... - 49 - 8.2. Water and Soil Conservation Works Supervision .......................................... - 49 - 8.3. Water and Soil Conservation Monitoring ....................................................... - 50 - 8.4. Construction Management ............................................................................... - 50 - 8.5. Completion Inspection and Acceptance for Water and Soil Conservation .. - 50 - 8.6. Capital Source and Usage Management ......................................................... - 51 - 9 Emergency Response Plan .............................................................................................. - 52 - 9.1. Risk Response for Pipelines Accident .............................................................. - 52 - 9.2. Risk Response for Gas Station Accidents ........................................................ - 52 - 9.3. WWTP Preventive Measures Against Accidents ............................................ - 54 - 9.4. Countermeasures and Emergency Plan for Accidents ................................... - 55 - 10 Cumulative Impacts Mitigation and Follow-up Assessment Plan .............................. - 57 - 10.1. Cumulative Impacts Mitigation ....................................................................... - 57 - 10.2. 10.2 Follow-up Assessment Plan ...................................................................... - 58 - 11 Communication and Stakeholder Participation ............................................................ - 60 - 11.1. Public Participation .......................................................................................... - 60 - 11.2. Stakeholder Dialogue Mechanism.................................................................... - 60 - 12 Environmental Training and Capacity Plan................................................................. - 61 - 12.1. Construction Training....................................................................................... - 61 - 12.2. Environmental Supervision Capability Building ................................................ 63 -1- China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 13 Environmental Protection Investment ................................................................................... 71 1 Overview The environmental management plan (EMP) is applicable to Anhui Xuancheng Infrastructure for -2- China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Industrial Relocation Project (Project hereafter). The project aims to develop key infrastructure in the Phase 2 development of Xuancheng Economic and Technological Development Zone (XETDZ), namely XEDTZ2. The implementation of this Project is the responsibility of Xuancheng Economic and Technical Development Zone Management Committee (MC). The project environmental impact has been clearly stated in the Project Environmental Impact Assessment (EIA) Report. The EIA report was compiled by the Anhui Research Institute of Environmental Science. The EIA report includes analysis on environmental laws, regulations and policies, project overview and alternative analysis, current situation of regional environment and social environment, investigation on existing environmental quality, project impact assessment, cumulative environmental assessment, information disclosure and public consultation, risk evaluation and emergency response plan, environmental management as well as the due diligence of Phase I XEDTZ development (i.e. XEDTZ1) and relevant infrastructures. In assessing cumulative impact, the EIA of this Project extensively draws on the Strategic Environmental Assessment for XEDTZ2. According to the existing environmental impact assessment laws and regulations of China and World Bank OP/BP4.01 Environmental Assessment, this Project is categorized as Category A is required to conduct full environmental assessment. The EMP conforms to the requirements of relevant national laws, regulations and technical guidelines, as well as safeguards policies of the World Bank, and Environment, Safety and Health Guidelines (EHS Guidelines) of World Bank Group. EMP applies the newest available and economical strategy to realize the impact mitigation objective of the Project. 1.1. Project Description According to the national strategy of transferring industries from east to hinterland China and the Anhui Provincial strategy to receive the transferred industries, Xuanchen Municipal Government adopted a planning to develop a pilot area in the Xuancheng Economic and Technological Development Zone (XETDZ) in 2010 to receive the transferred industries. The pilot area has an area of 25.6 km2 and is considered as the second phase of development of XETDZ, hence it is named XETDZ2. XETDZ is located in the west of Xuancheng Municipality. It has a jurisdiction area of about 200km2. The first phase (XETDZ1), with an area of about 17 square kilometers, has been developed in the eastern part of XETDZ. XETDZ2 is located to the west of XETDZ1 with Hefei-Hangzhou Expressway in between. (see Figure 1 and Figure 2 ) The XETDZ2 development include urban transport, municipal water supply, wastewater treatment, solid waste management, river course rehabilitation, municipal gas supply, and land and environmental improvement under high voltage power corridor. The World Bank loan is intended to support the works of 21 roads and associated water supply, drainage and wastewater networks, and a wastewater treatment plant, which are expected to be completed by 2015-2016.The project owner XEDTZ Management Committee will build another 19km roads with associated subsurface networks etc. using domestic funding. The Project Environmental Impact Assessment and Environmental Management Plan have covered all the components as shown in Table 1with other parallel non-Bank financed components. - 3 - AnHui Province China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Figure 1 Project location Table 1 Infrastructure Development of XEDTZ2 Activity Description Partly Non-Bank -4- China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Financed by Financed the Bank Loan 1. Urban Transport Component 1.1 Construction of 60.5 km of arterial, secondary and branch roads Yes 1.2 Construction of 2 highway interchanges Yes 1.3 Construction of 19.7 km roads Yes 2. Water Supply Component 2.1 Construction of 85.3 km of subsurface networks for water supply Yes 2.2 Construction of 38.8 km of subsurface networks for water supply Yes 2.3 Construction of a 30,000m3/d pumping station Yes 3. Wastewater Component 3.1 Construction of 78.8 km of subsurface networks for drainage Yes 3.2 Construction of 71.2 km of subsurface networks for wastewater Yes collection 3.3 Construction of a 25,000 m3 wastewater treatment plant with a 15 Yes km sewer main 3.4 Construction of 41.9 km of subsurface networks for wastewater Yes 4. Solid waste component, including building 143 drop-off points, Yes 4 solid transfer stations, 21 toilets 5. Rehabilitation of 18.1 km of river channel Yes 6. Gas supply component 6.1 Construction of 9.7 km of high-pressure and 60.5 medium Yes pressure gas networks 6.2 Construction of a combined natural gas pressure regulation and Yes gasification station; 6.3 Construction of a compressed natural gas filling station Yes 7. Landscaping of 14.7 km corridor under a power transmission Yes line -5- Figure 2 XEDTZ2 Location -1- 1.2. The EMP Objectives The EMP focuses on executing the mitigation measures for the identified environmental impacts and monitoring the effectiveness of the measures over the life cycle of the Project. Based on the EIA and SEA, the EMP is developed in accordance with Chinese environmental laws and guidelines, World Bank’s safeguard policies, and best practices from similar projects. The EMP objective is to ensure consistency between EIA and EMP to achieve appropriate standard of environmental protection. The EMP effectively meets manages the regulatory requirements and directs the project owner in the management contractors and sub-contractors. 1.3. The EMP Structure The key components of the EMP include procedures for overall environmental management during Project construction and operation. EMP covers the following elements  Environmental management roles and responsibilities;  Mitigation measures;  Supervision and Monitoring Plan;  Contractor Environmental Specifications;  Emergency Response Plan;  Soil and Water Conservation Plan;  Public Engagement and Stakeholder Participation Plan;  Environmental Training Plan;  EMP Budget EMP provides sufficient information for the Project owner, contractors, sub-contractors to implement the EMP, we will emphatically implement the following matters:  Meet the environmental requirements set by the P. R. China, Anhui province and World Bank;  Fulfill all environmental and socio-economic conditions associated with project approvals, permits and policies set out by the state, provincial and municipal levels;  Develop, promote and foster a shared sense of responsibility for environmental and social performance during the implementation of the Project;  Promote environmental awareness and understanding among regulatory bodies and XETDZMC including its retained contractor(s) through training and identification of roles and responsibilities towards environmental and social management;  Monitor environmental and social performance throughout the Project life cycle and adopt an adaptive management approach to realize the continuous improvement and minimum cumulative impact in XETDZ2;  Work with the local communities and affected stakeholders to ensure that they benefit as a result of project development; -1- China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012  Promise to send notice to inviting local stakeholder participation in every stage of the project monitoring process. -2- 2 Legal and Regulation Framework The Project complies with the environmental assessment laws and regulations in China and the World Bank safeguards policies. Requirements of compliance with the China’s laws and regulations and Bank’s policies are described in this section. The Bank’s Safeguard Policies Among the Bank’s 10 Safeguard Policies, two, i.e., the OP/BP4.01, Environmental Assessment, and OP/BP4.12 Involuntary Resettlement are triggered. The Project is in compliance with these two policies. Meanwhile, the Project is in compliance with Bank policies and requirements regarding disclosure of project information. See Table 2 for the compliance with the Bank’s safeguard policies. Table 2 Compliance with Bank’s Safeguard Policies Triggered by the Safeguard Policies Project Status of Compliance OP/BP 4.01 Yes Category A project. Environmental A full EIA and EMP are prepared; two rounds of public Assessment consultation have been carried out as part of the EIA procedure. OP/BP 4.04 No The Project does not involve any natural habitats Natural Habitats OP/BP 4.36 No The Project would not finance any activity that may involve a Forestry major change or degradation of the important forest area or related major natural habitat as defined in the Policy. OP/BP 4.09 No The Project would incur neither purchase of any pesticide nor Pest Management additional pesticide application. No action is required according to the Policy. OP/BP 4.11 No Not any cultural heritage or other physical cultural resource Physical Cultural has been found. Chance-find procedure is included in the Resources EMP. OP/BP 4.37 No There is no dam in the project area. Safety of Dams OP 4.10 No No indigenous people live in the Project area. Nor will the Indigenous Peoples Project impose impact to any indigenous people. OP/BP 4.12 Yes A Resettlement Action Plan is prepared. Involuntary Resettlement OP/BP 7.50 No There is no international waterway involved in the project Projects on area. International Waterways OP/BP 7.60 No There is no dissentient region involved in the project area. Projects on dissentient Region The World Bank Group Environmental, Health and Safety Guidelines (the EHS Guidelines) are also applicable to the Project. The mitigation measures included in the Project Environmental Management Plan are fully consistent with the requirements of the General EHS Guidelines, especially the provisions on construction management), in that the general requirements in the EHS Guidelines also exist in the -1- China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 China laws, regulations, guidelines, and construction management rules. The measures in the Environmental Management Plan are also in full compliance with the requirements of the EHS Guidelines with respect to the Project (see Table 3). Table 3 Compliance with World Bank Group EHS Guidelines WBG EHS Guideline Compliance of EIA/EMP If the facility or project is close to an identified XETDZ2 is close to the Jingting Mountain ecologically sensitive area (such as a national Scenic Area. park), it shall minimize the increase in pollution Development and operation of the gas supply levels whenever and wherever feasible. In utilities in the Zone will make natural gas addition, appropriate mitigation measures may available to the industries and tend to result in also include the use of clean fuels or much less emission of air pollutants. technologies, and application of comprehensive pollution control measures. Dust or particulate matter (PM) is the most Dust-control methods, such as coverage, common pollutants of unorganized emissions. sprinkling for dust suppression or moderate Certain operations (such as transport and wetting of the materials in open-air stack will open-air storage of solid materials) and bare be applied during the construction period. soil surface (including unpaved road) will Sprinkling and suppression will be applied release particulate matter. to transport of materials on paved or unpaved roads. No industrial waste water, domestic In XETDZ2, the industrial wastewater is not wastewater, wastewater from operations of allowed to enter the wastewater treatment plant public works or stormwater shall be discharged unless it is subjected to a pretreatment and into a public or private wastewater treatment meets the Level 3 discharge limits of the system unless it meets the pretreatment and Comprehensive Wastewater Discharge monitoring requirements of the wastewater Standards (GB8978-1996). treatment system it is to enter. Storm water shall be separated from process Separate storm water drainage and wastewater wastewater and domestic wastewater in order to systems are applied in XETDZ2, and separate reduce the wastewater generation that needs storm sewers and wastewater collectors will be treatment before emission. developed. Noise prevention and control measures shall be Low sound and power level equipment will be applied if the projected noise level at the most selected. Vibration isolation will be installed for sensitive receiving point due to the operation of machinery and equipment. project facilities or operation activities will Running time of certain equipment or operation exceed the noise limits. will be limited, particularly for those mobile noise sources that will move in a community. Carry out design, construction, operation and The Changqiao Wastewater Treatment Plant maintenance of a wastewater treatment plant, so refers to the Level 1-A discharge standards of that the treated effluent can meet relevant the Pollutant Discharge Standards of Municipal national requirements or internationally Wastewater Treatment Plant (GB18918-2002) accepted standards. for compliant effluent discharge. Odor from the treatment plant will interfere Coarse screen, influent pumping station, and with the WWTP staff and the surrounding sludge thickening tank may be designed as community. Measures to prevent reduce and enclosed chambers with covers at the top to control air emissions and odor are suggested. constrain the odor diffusion space. For the sludge dewatering room that is of bigger space, odor will be collected for concentrated and biological treatment. Vegetation consisting of tall trees that are strongly pollution resistant and capable of -2- China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 WBG EHS Guideline Compliance of EIA/EMP absorbing harmful gases will be provided around the WWTP boundary to serve as isolation buffer and play absorption function. Health protection distance will be established. No residential development, schools or other development of concentrated human activities shall be planned within the 100 m of the WWTP site, especially in areas at its downwind direction. Sludge treatment and utilization. After Sludge will be dewatered by mechanical belt stabilization, the sludge may be dewatered for press and the dewatered sludge will be either disposal at the landfill or incineration, or transferred to the Xuancheng sanitary landfill further processing to be conducive for re-use. for disposal. Sludge will be tested in a laboratory. If the results show that it meets the requirements of Pollutant Control Standards of Agricultural Purposed Sludge (GB4284-84), it may be applied for agricultural and forestry purposed land application. Domestic Laws and Regulations Preparation of the EA documents is in full accordance with the above laws, regulations and guidelines. Compliance with key domestic laws and regulations associated with the Project are summarized in Table 4. Table 4 Compliance with China Laws and Regulations China's Laws And Regulations Compliance of the Project Environmental Impact Assessment Law  The full EIA report was prepared by a certified EIA consultant and the project implementation unit, and has been approved by the Anhui Provincial Environmental Protection Department.  Two rounds of public consultation have been carried out. Circulation to Strengthen EIA Management of  The EIA report and Environmental IFI Financed Development Projects Management Plan are in line with the Bank’s safeguard policy. Land Administration Law  The land of XETDZ2 is of development land use and the nature is in line with Xuancheng’s urban land use master plan (2006-2020). Water Pollution and Control Law  XETDZ2 will be developed with such sewer networks as to enable centralized wastewater treatment.  The wastewater treatment plant outfall is not located in a surface water source reserve. -3- China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Water Conservation Law  A soil and water conservation program is prepared, and submitted to the Xuancheng Water Authority for approval. Erosion prevention and control measures will be carried out in accordance with the approved soil and water conservation program.  Building activities in the abandoned sand, stone, soil, etc. stacked in the spoil ground water and soil conservation program, and to take measures to ensure that no new hazards.  The preparation of the soil erosion monitoring program, and will monitor the situation on a regular basis reported Xuancheng City Water Authority. Cultural Heritage Conservation Law  During the construction of the Project, in the event of a cultural heritage site being found by any entity or individual, the site shall be protected and the issue shall be immediately reported to the local cultural heritage administrative department. Industry Relocation and Environmental Management By nature the project context is the incremental industrial growth and expansion from eastern coastal area to hinterland of China. The project aims to build an infrastructure platform to receive the industrial expansion in Xuancheng which holds an exceptional geographical location to meet the objective. Compared to neighboring Jaingsu and Zhejiang provinces, Xuancheng enjoys relatively abundant and cheaper land and human capital, and good quality environmental resources. Therefore, it is more precise to consider the project an industrial expansion project. It is possible that a few factories would close its original plants and move to XEDTZ2. The closing, equipment decommissioning and relocation shall comply with national and local regulations. And the XEDTZ shall put their compliance as screening criteria before receiving the enterprises. A policy analysis was carried out to study Chinese national regulations in terms of solid waste management, contaminated site clean-up. Such regulations in Zhejiang, Jiangsu, Shanghai and Guangdong have been examined as well. Based on the review, it is clear that a “polluters pay� principle is applied to address the issue. Local governments are responsible for supervision and enforcement in this regard. Therefore, local environmental authorizes take the responsibility of the industrial relocation and legacy issues under its jurisdiction. Original plant owner shall be responsible for remediate environmental impacts such as contaminated soils following relevant regulations and technical standards. The XEDTZ2 land use pattern has been determined as Category 1 and 2 industrial land use, meaning from legal perspective heavy pollution industries such as refinery, chemical are not allowed to enter XEDTZ2. Overall, when screening new enterprises, XEDTZ will strictly follow land use plan and SEA requirements to carefully select and conduct due diligence of incoming enterprises. Environmental issues, if any, associated with the relocation process will need to be identified and incorporated into the screening criteria. -4- China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 3 Environmental and Social Baselines 3.1. Environmental Characteristics of XEDTZ2 The XETDZ2 is located in the northwest of Xuancheng City with a floor area of about 25 km2. Its landforms are mainly downland and plan and the land use types are mainly farmland, tea garden, idle land and a few residential lands. The XETDZ2 is characterized by the following:  Typical agricultural area;  Good water, power and gas supply and convenient transportation;  Good environmental quality and considerable environmental assimilation capacity;  The XETDZ2 scale and needed infrastructures are expanding rapidly and will be increased quickly. 3.2. Resource and Environment Limit The XETDZ2 is identified to have the following resource and environment limitation factors.  The land resources available for development in Xuancheng City are limited. Concentrated infrastructure and industrial development in the XETDZ2, which is an efficient way in terms of land use and conducive to environmental management.  Xuancheng belongs to acid rain control area. Coal-based energy use therefore shall be limited in order to reduce impacts to ambient air quality.  In the vicinity of XEDTZ2 there is a Jingting Mountain Scenic Area which requires limiting air emissions from industries. 3.3 Functional Zoning of Regional Environment 1. Surface water Zhouhan River, Qingyijiang River, Changqiao River and Xijing River are subject to water quality standard Class III in Environmental Quality Standard for Surface Water (GB3838—2002). 2. Ambient air Air quality in the XETDZ2 area is subject to Ambient Air Quality Standard GB3095-1996 Grade II; The air quality of Jingtingshan Scenic Spot is subject to Ambient Air Quality Standard GB3095-1996 Grade I 3. Acoustic environment The industrial land in the assessment area is subject to Noise Environment Quality Standard (GB3096-2008) Class 3, areas on both sides of arterial traffic are subject to Class 4a of the Standard and other areas subject to Class 2. 4. Soil -5- China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 The soil environment is subject to Soil Environment Quality Standard GB15618-1995 Grade II. 5. Groundwater The groundwater is subject to Underground Water Quality Standard GB/T14848-93 Class III. 6. Sensitive Areas Jingting Mountain Scenic Area, which has an area of 2009 ha., in which the forestry land is 1402 ha, including woodland 1148 ha, bush land 216 ha with forest coverage of 67.9% and forestry land greening rate 97.3% and the vegetations belong to subtropical evergreen and broadleaved deciduous forest vegetation belts, which are all artificial spruces, masson pines and camphorwood; in addition, there are also economic trees such as tea, pear, peach, plum and Chinese chestnut trees. The XETDZ2 is far away from the core area of Jingting Mountain Scenic Area, beyond the coordinative protection range of peripheral environment of Jingting Mountain Scenic Area and is about 400 m away from its nearest place, which meets the protection requirements of the Scenic Area. 3.4 Environmental Quality During environmental assessment, the ambient air, surface water, groundwater, noise, sediments, river course bottom mud and soil environment quality of the XETDZ2 were sampled and tested to determine the current situation of environmental quality in the Project area. The result shows that the regional environment is in good condition and conforms to relevant Chinese quality standards. These results are basically consistent with the environmental quality monitoring result of planning environment assessment carried out previously. -6- China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 4 Environment Management Roles and Responsibilities 4.1. Agencies and Institutions Involved in the Environmental Management The implementation of this EMP requires the involvement of several agencies and institutions, each fulfilling a different but vital role to ensure effective environmental management for the Project. Essentially there are two groups of institutions involved in the process of environmental management: those responsible for organizing or implementing the EMP, and those that enforce the standards, laws and regulations relevant to the project, supervise the EMP and the overall environmental performance during the construction and operation of the Project. The EMP institutional structure for Project construction is shown in Figure 3. Environmental Management and Executive Agency Environment Supervisory Agency APEPD XEDTZ MC(PMO) XEPB XEDTZ Construction Investment Co. (PIU) XCTDZ of EPBO Design and Construction IEMC ESE EQMC Environmental Management and Executive Agency Contractor/Construction Site/ Surrounding Environment Figure 3 Management Structure during Construction The main environmental responsibilities of the respective institutions are summarized in Table 5. Table 5 Summary of Environmental Management Responsibilities No Agency/Unit Responsibilities Xuancheng Economic The XETDZMC will take the overall responsibility for the management and Technological Zone and coordination of project implementation. Its WB Financed Management Committee Environmental Supervision Office (PMO) handles the day-to-day 1 management and coordination of project implementation. It will oversee (XETTDZMC/PMO) the implementation of the Project and fulfill the requirements of World Bank. -7- China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Anhui Provincial The APED reviewed and approved the Project EA. It will be responsible Environmental for the enforcement of the laws, regulations, technical guidelines, and 2 Protection Department environmental quality standards during the Project construction and (APEPD) operation. Xuancheng Municipal On behalf of the APEPD, the EPBs will carry out environmental Environmental monitoring, supervision and enforcement during project construction and 3 Protection Bureau (EPB) operation, deals with public complaint, ensure “three simultaneous� and and XEDTZ EPB proper operation of environmental protection facilities. XEDTZ Construction The CTC, a subsidiary agency of XETDZ, will implement above infrastructure construction engineering, including the procurement, 4 Investment Company construction management, safeguard policy implementation and (CIC/PIU) compliance, as well as the monitoring, reporting tasks under the Project. Environmental The ESE are responsible for inspecting, supervising, and auditing all Supervision Engineer construction works and other activities undertaken by the Contractor(s), 5 to ensuring compliance with the environmental protection requirements (ESE) and contractual requirements. Contractor(s) is hired by the Project Owner to undertake the detailed 6 Contractor(s) design and the construction activities for the Project. Independent The IEMC is hired by the Project Owner and is independent of the ESE Environmental and Contractor. The objectives of the IEC assignment is to assess the 7 Management Consultant implementation and performance of the Project EMP during construction, provide management recommendation to the Project owner, and eventually (IEMC) ensure the Project compliance with the EMP. Environmental Quality The EQMC refers to specialized monitoring institutes who will conduct Monitoring Consultant environmental quality monitoring according to the environmental 8 monitoring plan included in the EIA reports. The Project Owner will (EQMC) employ EMS to implement the monitoring plan. 4.2. Environmental Management Responsibilities During Construction � XETDZMC(PMO) and CIC(PIU) The XETDZMC, as the project owner, will take the overall responsibility for the project implementation and coordination. The CIC is implementation agency for the Project. It is responsible for day-to-day management of project implementation, including EMP implementation supervision and compliance. The CIC’s environmental management responsibilities include, but not limited to, the following aspects. 1) Supervise the implementation of mitigation measures and other environmental protection measures during project construction, including incorporation of the measures into the bidding documents and contracts, organizing training for the contractors, enforce other environmental management plan and conduct periodically inspection on the construction sites. 2) Engage and supervise environmental monitoring consultant (for example, IEMC and EQMC) to carry out environmental monitoring in accordance with the project environmental monitoring plan. -8- China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 3) Engage and supervise the IEMC to provide technical support including management advice, training, periodical field inspection, and preparation of reports. 4) Field investigation and wirte reports The CIC will appoint 1-2 dedicated environmental staff who will be responsible for overall coordination of the EMP implementation. The dedicated environmental staff must have adequate knowledge on environmental management as well as environmental legislation to can understand and implement the EMP. Their duties include the following: 1) Ensure the project environmental management is in compliance with the requirements of EMP and relevant legislation. Take appropriate measures if non-compliance is identified. 2) Maintain open and smooth communication between XETDZ, supervision engineers and contractors with regard to environmental issues. 3) Review and approve the site-specific Environmental Protection Implementation Plan prepared by Contractors, that may cause great environmental impacts due to key project activities. Organize regular site inspections of all construction areas according to the requirements of EMP. 4) Review and filing the reports related with environmental management complied by the constractor and ESE 5) Monthly reporting to XETDZMC on environmental issues of construction sites. � Contractors The Contractor and its employees shall firstly at all times try to avoid the any negative impacts that may result from the project construction activities and secondly shall comply with the mitigation measures specified in the EMP and contracts to minimize harm and nuisances on the environment and local communities. Remedial measures which cannot be effectively carried out during construction stage should be carried out on completion of the woks and prior to issuance of the acceptance of completion of works. The Contractor shall establish a robust environmental management system to meet the requirements of the institution, site-specific measures, monitoring, training and reporting requirements. Detailed Environmental Specifications for Contractor(s) are included in Chapter 7. � Environmental Supervision Engineer (ESE) ESE is an integral part of Supervision Engineer’s function. Each Supervision Engineer company will assign at least one ESE to each contract/working group. The responsibilities of the ESE include: 1) Review and ensure the Contractor’s construction organization plan in compliance with the requirements of EMP and project construction with regard to environmental protection and impact mitigation; 2) Review Contractor’s site-specific Environmental Protection Implementation Plan and -9- China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Environmental Protection Construction Organization Plan of the construction sites in view of key project activities with potential environmental impacts (if any), prior to the project owner’s final review and approval. 3) Carry out day-to-day site inspection and ensure the Contractor’s activities in compliance with EMP and other relevant regulations. Instruct the Contractor to take corrective actions within the ESE determined timeframe in case non-compliance or discrepancies identified. 4) Shall provide assistance to the XETDZ, as necessary, during the implementation of the environmental monitoring and supervision work. . 5) Regularly monitor the performance of the Contractor’s environmental management system, including environmental staff, procedure and reporting. Verify and confirm environmental supervision procedures, parameters, monitoring locations, equipment and results. In case any discrepancies identified, the ESE will instruct the Contractor to take corrective actions, including capacity building and replacement of the Contractor’s environmental staff. 6) Regularly prepare environmental supervision reports and submit to the XETDZMC for review and filing. 7) As a member of Supervision Engineer, approve invoices or payments according to the implementation and performance of EMP. � Independent Environmental Management Consultant (IEMC) The XETDZ will engage an IEMC to provide technical support for environmental protection during the construction. The IEMC will be independent of the ESE and Contractors, and will directly report to XETDZ. The IEC shall be led by a person who can independently and professionally examine records, procedures and processes. He/she may require a small team to assist he/she with checking the sites (i.e. the IEMC team). The IEMC shall have extensive knowledge and experience in environmental monitoring and auditing to provide independent, objective and professional advice on the environmental performance of the Project (at least 5 years experience is required). The IEC shall familiarize himself with the project works through review of the reports, including EMP of the Project. In particular, the IES is expected to perform the following duties: 1) Review and audit in an independent, objective and professional manner in all aspects of the EMP; 2) Inspect and confirm the accuracy of monitoring results, monitoring equipment, monitoring locations, monitoring procedures and locations of sensitive receivers; 3) Carry out random sample check and review on monitoring data and sampling procedures, etc; 4) Conduct random site inspection; 5) Review the EIA recommendations and requirements according to the implementation of environmental protection measures; 6) Review the effectiveness of environmental mitigation measures and project environmental performance; 7) Inspect and certify the environmental acceptability on the construction method, relevant design plan and documents for application according to the need. Where necessary, the IEC shall seek the least impact alternatives in consultation with the designer, the - 10 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Contractor(s) and XCTDZ; 8) Inspect the investigation results of any non-compliance of the environmental 9) Quality performance and the effectiveness of corrective measures; 10) Feedback audit results to XETDZ and ESE team according to the procedures of non-compliance in EMP, and provide Supervision Engineer (ESE) suggestions on actions of penalty, suspension of works or other punishment; 11) Provide environmental training to the Contractors, ESE and XETDZ’s staff prior to Project strated and during construction; 12) Help prepare semi-annual environmental monitoring report to the XETDZ and the World Bank. Textbox 1 Terms of Reference for IEMC Terms of Reference for IEMC The tasks outlined below is designed to assess the implementation of EMP of the Project during construction, provide the maangemetn recommendation to the Project owner and ensure the requirements of the Project compliance with EMP. Task 1 – Review the Project Documents The IEMC is expected to review the project EIA, EMP, RAP and relevant regulations. A work plan shall be prepared based on the review and submitted to the project owner for examination and approval. Task 2 – Provide EMP Training Prior to the construction is started, the IEMC will prepare training materials based on the EMP and provide training to the Project owner, contractor and supervision engineer. During the Project implementation, the EEC will carry out such EMP training according to the actual needs (at least one time a year). Task 3 – Field Visit and Supervision 1) Prior to the construction is started, the IEMC will assist the Project owner to checking the environmental protection methods in the constructor’s construction plan and providing comments as appropriate. 2) During construction, carry out regular field visit to the Project site. During the field visit, - 11 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 the IEMC will check the documents related to environmental management such as construction environmental protection plan, environmental monthly report; check the implementation of institution, staffing arrangement and mitigation measures. Provide corrective recommendations according to the non-compliance behavior and promote good practices; 3) Visit the crowd affected and provide management recommendations to the Project owner; and 4) Identify environmental issues that may not be identified during the Project preparation stage, and provide recommendations on alternatives and/or mitigation measures to the Project owner. Task 4 – Environmental Monitoring The Project owner will engage an environmental quality monitoring consultant to carry out monitoring during construction. The IEMC is expected to prepare the terms of reference for the monitoring based on EMP requirements, assist in the implementation of monitoring, review the monitoring results and report to the project owner. Task 5– Reporting During the Project implementation, assist in the Project owner to prepare semiannual environmental monitoring and supervision report and submit to the XETDZ, AEPD and the World Bank. � Environmental Quality Monitoring Consultant (EQMC) In order to closely monitor the environmental quality in the Project area and minimize environmental impacts during construction and operational stage, the XETDZ will engage specialized environmental monitoring consultants to implement the environmental monitoring plan developed during EA stage. The responsibilities of the EQMC include: 1) Familiar with the Project works and the EMP, particularly the environmental monitoring plan; 2) Carry out the environmental monitoring timely and in a professional manner in accordance with the environmental monitoring plan; 3) Inspect and confirm the accuracy of monitoring results, monitoring equipment, monitoring locations, monitoring procedures and locations of sensitive receptors; - 12 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 4) Submit the monitoring results and recommendations to XETDZ in time. 4.3. Management of Contractor(s) The project contractor will be a key component in environmental management, pollution control and impact mitigation. During the construction period, the contractor shall always station in the construction site, who shall be mainly responsible for effective controlling and reducing the impact on the environmental. Most of the environmental protection measures shall be implemented by the contractor. In order to ensure the contractor implement the relative environmental protection measures and EMP, the following measures shall be taken: 1) During pre-qualification, the environmental management shall be included in the authentication clause when the contractor’s qualification is reviewed. Under the same condition, it shall be given priority to the bidders who have passed the ISO9000 and ISO14000 authentication; 2) In preparation the bidding document, the Project owner shall ensure mitigation measures included in the EMP are fully incorporated in the relevant clause, and require the potential bidders to prepare the bids that fully cover the budgetary estimates for EMP implementation. Therefore, the implementation of the environmental protection measures will become the obligation and responsibility of the successful bidder; 3) Every Contractor will be required to provide at least one dedicated full time environmental staff on each section of the Project. In order to be qualified for the job, the environmental staff will receive an environmental training program first; 4) Prior to construction, the Contractor are required to submit site-specific Environmental Protection Implementation Plan and Environmental Protection Construction Organization Plan of construction sites in view of the key project activities with potential impacts (if any). The Plans shall be demonstrate compliance with the requirements of domestic environmental regulations and the mitigation measures contained in the EMP. The plans shall provide such details as commitment to environmental protection by the Contractor’s project management team; the method of implementing the Project EMP; detailed designs and installation of anti-pollution facilities (e.g. drainage channel, settling tank, temporary noise reduction barrier, etc); environmental control mechanism; detailed earthworks management plans and site construction plans (show indetail that the measures are proposed to minimize mitigate and control method of all kinds of influence in construction period) as well as the environmental monitoring program for different construction stages. 5) Prior to the construction is started, the contractor shall receive adequate training on EMP and relevant regulations. Each section/sub-contractor and contractor shall appoint at least one project manager and one environmental engineer to join the training. In addition, the ESE shall also join the training. - 13 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 5 Environmental Impact and Mitigation Measures Based on the key findings of EIA, the highlighted environmental impacts and mitigation measures are summarized in the following sections. Table 5-1, Table 5-2, and Table 5-3 list the major activities and stages of the Project, potential environmental impacts identified, typical mitigation measures as well as implementation and monitoring responsibilities. These mitigation measures are developed to address the identified impacts of design, construction and operation stages, in accordance with relevant national laws, regulations, guidelines and norms, as well as World Bank policies,(including the Environment, Health and Safety General Guidelines and specific Guidelines for Water and Sanitation Environment, Health and Safety). The detailed management plan such as contractor specifications, soil and water conservation plan, contingency plan, XEDTZ2 cumulative environmental impact follow-up plan, and capacity building plan are further elaborated in the Chapter 7-11. - 14 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Table 6 Environmental impact and mitigation measures in design stage Reference Who Who Monitoring Monitoring Activity Potential Impacts/Issues Mitigation measures to EMP and Implement Monitor indicator frequency RAP Land Resettlement impacts on original Prepare resettlement action plan according to the national Wuhan XETDZ, The RAP shall be acquisition and RAP By appraisal residents in the XETDZ2 policies and policies of WB University WB approved by WB resettlement ① It is required to consider comprehensively during project design, the project shall be designed according to the surrounding environment and it is required to further refine the permanent land occupation plan to use the land reasonably. ② It is required to pay high attention to the crowd health during construction in design, the living conditions of temporary living area shall not be simple and crowded and meanwhile, it is required to select area with relatively good Temporary or permanent land surrounding environment as the living area of construction take and resettlement; improper personnel and prevent the transmission and spreading of XETDZ, The EIA shall be site selection of sediment/spoil EMP XETDZ, Social impacts infectious diseases. Design approved by WB By appraisal disposal sites resulting impacts Chapter 7 WB on surrounding sensitive ③ The bottom mud stacking yard shall avoid the surrounding Institute and APEPD receptors, etc. density villages; the distance from the bottom mud stacking yard to the nearest village shall be controlled within above 50 m, which can effectively avoid the influence of bottom mud stink on the surrounding residents. ④ Know the opinions and suggestions of public and all circles of the society by the Project construction influence prior to the Project development, in the process of and after the project construction through public participation to make the Project design to be more perfect. As the construction noise is relatively large in the process of building engineering and road engineering, it is required to The EIA shall be Impacts on construction take reasonable and effective noise isolation and reduction EMP XETDZ, EA XETDZ, approved by WB By appraisal personnel measures in project design to reduce and mitigate the Chapter 7 Consultant APED and APED influence of construction noise on the on-site construction Noise personnel. environment ① Conduct special design for the greening belt on both sides Impacts of traffic noise on life of of the road; The EIA shall be EMP EA XETDZ, residents in the sensitive ② provide ventilation and noise isolation window to the Chapter 7 Consultant WB approved by WB By appraisal receptors along the roads sensitive points on both sides of the road according to the and APED actual traffic and noise monitoring results. - 15 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 It is suggested that the planning department shall not add The EIA shall be Atmospheric Impacts on sensitive receptors EMP EA XETDZ, sensitive points within 80m on both sides of the road; approved by World By appraisal environment along the roads Chapter 7 Consultant WB Bank and APED It is required to consider comprehensively during project The EIA shall be design, the project shall be designed according to the EMP EA XETDZ, Prior to bid Land occupation approved by WB surrounding environment and it is required to further refine the Chapter 8 Consultant WB evaluation and APED permanent land occupation plan and use the land reasonably. Prepare water and soil conservation plan. The layout of water soil and preservation shall both fully take into account of the The EIA shall be EMP EA XETDZ, Soil erosion type, way and hazard degree of soil and water loss caused by approved by WB By appraisal Chapter 8 Consultant WB Ecological the project and meanwhile shall be combined with the overall and APED environment plan of management area in the project operation period. In the process of design, it is required to arrange the temporary sediments yard during construction and permanent disposal after construction reasonably according to the specific The EIA shall be Influence of river course slag EMP EA XETDZ, condition of different channels, establish flood prevention slag approved by WB By appraisal dumping yard Chapter 8 Consultant WB retention and waste prevention slag retention to centrally and APED control the slag dumped and minimize the influence of stacking of dumped slag on the environment. The EIA shall be By appraisal An environmental specification for contractor has been approved by WB, Contractor Improper behavior may result in EMP EA XETDZ, prepared as part of the EMP and will be incorporated into incorporated into responsibility negative environmental impacts chapter 6 Consultant WB By bids bidding document and contracts bidding document awarding and civil contract - 16 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Table 7 Environmental impact and mitigation measures during construction Potential influence Reference to Implementation Monitoring Monitoring Monitoring Activity Mitigation measures problems EMP and RAP responsibility responsibility indicator frequency ① Establish road diversion and temporary access plan and establish enough traffic diversion indication plates. It is required to make an announcement to reassure the public with radio, TV and newspaper in advance; ② It is required to strengthen bridge construction The ESE shall management, especially the management of structures, conduct on-site Traffic and traveling Prior to Prior to construction, it is required to coordinate with EMP Chapter 7 Contractor ESE, IEMC supervision; disturbance construction relevant departments, arrange well construction time the regulations shall and vehicle passing time and set visible warning lamp be complied with on structure such as pier to remind the passing vehicles of safety; Social ③ It is required to set warning lighting lamp in the environment construction road to lead the passing of vehicles. According to the site investigation and upon consultation to relevant departments along the Project, no cultural relic or tombs will be impacted during construction. Publication and Chance-find procedure will be followed: in the process training have been Cultural relic protection of construction, if new underground cultural relics are EMP Chapter 7 Contractor ESE, IEMC provided; cultural Day-to-day discovered, according to relevant laws and regulations relic serendipitous on cultural relics, the construction unit shall protect well record the site and notify the cultural relic management department in time for rescue and treatment to ensure the safety of cultural relics. ① Equipment with high noise and vibration is strictly prohibited to work in rest time at noon or night, the construction unit shall select low-noise machinery and equipment or equipment with noise isolation and absorption device; Publication and ② Arrange the construction time reasonably. Generally, training have been Acoustic noise in day time as a less influence on the daily life of EMP Chapter 6 provided; Noise Contractor ESE, IEMC Day-to-day environment residents, while the noise at night will influence and 7 the environmental people’s rest. So it is required to arrange the monitoring proposal construction time reasonably to avoid construction has been prepared within the rest time at night for rest of residents; ③ Arrange construction place reasonably, the high-noise operation area shall be far from the noise-sensitive points; for some construction sites with - 17 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Potential influence Reference to Implementation Monitoring Monitoring Monitoring Activity Mitigation measures problems EMP and RAP responsibility responsibility indicator frequency serious influence, it is required to take temporary sound isolation enclosure structure and it is also possible to consider building temporary workshop on the side close to the sensitive point to replace the role of noise isolation wall. It is required to arrange more equipment to operate simultaneously as possible for the civil works to shorten the influence time. It is required to Relatively concentrate the fixed vibration sources on the construction site to reduce the range of vibration interference. Prior to construction surrounding the sensitive points such as school and residential area, it is required to take isolation reduction measures such as temporary noise barrier; ④ The passing of construction transportation vehicles shall be arranged on the side away from sensitive areas such as residential area and school. ⑤ According to the provisions of Regulations on prevention and control of environmental noise pollution of the PRC, if the specified limit is still not reached after noise-reduction measures are taken, the construction unit shall apologize and make compensation to the influenced organization or individual. ① Arrange the construction period reasonably, dredge the river course and build bridge in dry season and reduce the influence of suspended material increasing on river water quality caused by construction. ② Excavate on the construction site to form temporary sewage sedimentation tank. Waterproof cloth or plastic film can be used to prevent seepage. The sewage shall be drained to the sedimentation tank for static The ESE shall sedimentation for 2 h. After treatment, the sewage can conduct on-site Surface Impacts of river course be used for the re-washing of sand and stone or mixing supervision; Water improvement on surface EMP Chapter 7 Contractor ESE, IEM Day-to-day of concrete. The residual sewage shall be drained to the the regulations shall environment water river course after sedimentation. The slurry in the be complied with; sedimentation tank may be used for the mixing of earthwork and stonework after natural dehydration through evaporation and drying in the interval time. ③ The river course dredging shall be arranged in the low-water season. During construction, set up diversion channel to separate the construction area with river water. Prior to river course dredging, first dry the river bottom, which can reduce the pollution to water body - 18 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Potential influence Reference to Implementation Monitoring Monitoring Monitoring Activity Mitigation measures problems EMP and RAP responsibility responsibility indicator frequency during construction. ④ The river water penetrating the dredging area will increase the sand content under the disturbance of excavator and increase the muddiness of water body. Such water can be stored in the dredging area temporarily and drained to the river course after sedimentation. ⑤ The construction site shall be equipped with oily water collection container of construction machinery to collect the oily water generated. The oily water collected shall be sent to the unit with treatment ability for treatment and is prohibited to be discharged directly. ⑥ The living area of construction personnel shall be arranged in the area with sewage pipes network and the domestic sewage shall be drained to the urban sewage pipes; when there is no sewage pipe network near the living area, it is required to build septic tank in the construction area use the domestic sewage for farmland after collection and preliminary treatment. It is prohibited to directly drain the untreated domestic sewage in the river course. ① The construction waste water may not be directly discharged to the water body. After sedimentation, the construction waste water may be discharged to the municipal sewage pipe network or drained externally with the surface runoff. The domestic sewage shall be drained to the urban sewer network or drained externally with surface runoff after pre-treatment via the sedimentation tank or septic tank. During construction, the domestic sewage is strictly prohibited to be drained The ESE shall Impacts of other to the surrounding water body without treatment. conduct on-site construction activities on the ② The construction unit of this Project shall also EMP, Chapter 7 Contractor ESE, IEMC supervision; Day-to-day surface water environment conduct simple treatment of filtration and sedimentation the regulations shall to the slurry water, which is prohibited to be discharged be complied with; externally. The construction unit shall strengthen management and ensure civilized construction. ③ For the newly constructed project, the domestic sewage and washing waste water generated shall be centrally collected. Prior to the drainage pipe is laid, it shall drained to the water body nearby with the surface runoff after pre-treatment via the sedimentation tank and septic tank; after the underground pipe network is laid, - 19 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Potential influence Reference to Implementation Monitoring Monitoring Monitoring Activity Mitigation measures problems EMP and RAP responsibility responsibility indicator frequency the waste water centrally collected shall be drained to the newly built drainage pipe network after pre-treatment via the sedimentation tank and finally drained to the municipal pipe network for treatment. ④ The domestic garbage, construction garbage and repair garbage will cause pollution after they enter the water body, so all of them shall be recovered, classified, stored and treated. The available materials shall be used or submitted for purchase. For example, the residual paper, wood, metal and glass garbage may be reused by the purchase station. Those unavailable shall be submitted to the sanitation department for innocent treatment, burning, landfill and stockpiling. ⑤ The residual and waste oils during construction shall be collected, recovered and disposed with different containers respectively; the sand and stone washing water for roadbed construction and washing water for concrete mixing equipment shall be treated in the sedimentation tank first and the waste water shall be recovered for the construction site as far as possible and sprayed with water to reduce the raising dust; ① During excavation, it is required to keep the excavation face moist; in case of windy weather, it is required to avoid excavation; for the excavation area adjacent to the residential area, if the excavation face is dry, water spraying measures shall be taken to reduce raising dust. ② When the wind speed is too high, it is required to The ESE conducts stop construction and cover the stockpiling of easy-dusting materials. on-site supervision; Impacts of river course Regulations are Atmospheric ③ The vehicle loading may not too be full. Take rehabilitation on EMP Chapter 7 Contractor ESE, IEMC complied with; Day-to-day environment covering and sealing measures to reduce spilling along atmospheric environment the environmental the way. When leaving the site, the vehicles must be monitoring proposal clean and no earth and sand shall be taken out of the has been prepared. site. The pavement shall be sprayed with water to reduce raising dust. ④ The temporary stockpiling point shall be in low-lying place as far as possible ⑤ The mud, sand and stone shall not be stockpiled too high, which can reduce the dusting under wind action - 20 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Potential influence Reference to Implementation Monitoring Monitoring Monitoring Activity Mitigation measures problems EMP and RAP responsibility responsibility indicator frequency ⑥ It is required to send the dredging sand and earth stockpiled temporarily to other sites for filling to reduce the stockpiling time. ⑦ The dredging project shall be selected in low-water season and autumn and winter are better; avoid the hot summer when the smell of bottom mud diffuses, which can reduce the influence of stink on the surrounding residents. Meanwhile, execute the construction in section. The bottom mud dredged shall be transported to the stacking yard on site and shall timely carry out the ecological recovery treatment is required. With the construction completion in each construction area and sludge hardening in the stacking yard and vegetation recovery, the stink will disappear gradually. ① The floor level on the construction site must be hardened; if conditions permit, concrete floor level shall be adopted; ② In the process of excavation, drilling and removing, spray water to keep the work moist; the loose and dry surface earth on the construction site shall also be watered frequently to prevent and control dust; when backfilling earthwork, it is required to spray water appropriately when the surface earth is dry to prevent raising dust; it is prohibited to execute construction in windy weather and determine the construction place The ESE conducts reasonably; on-site supervision; Impacts of other ③ Strengthen the management of stacking yard of the Regulations are construction activities on the backfilling earthwork. It is required to establish EMP Chapter 7 Contractor ESE, IEMC complied with; Day-to-day atmospheric environment measures for earthwork surface compacting, regular the environmental water spraying and covering etc;, the earth and waste monitoring proposal building materials not needed shall be removed timely has been prepared. and shall not be stacked for a long time. ④ During construction, it is required to take full-closed construction measures to prevent and control dust pollution. The earth transporting trucks and building material transportation vehicles shall be covered with manta, canopy or subject to other spilling measures as specified. The loading shall not be too full to ensure there is no spilling in the process of transportation; plan well the operation route and time of transportation vehicles to avoid the running of vehicles in prosperous areas, traffic concentrated areas and residential areas - 21 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Potential influence Reference to Implementation Monitoring Monitoring Monitoring Activity Mitigation measures problems EMP and RAP responsibility responsibility indicator frequency and other sensitive areas as far as possible; for the road section with high environmental requirements, it is required to select night transportation as the actual situation to reduce the influence of dust on environment. The earth spilling on the ground in the process of transportation shall be cleaned in time to reduce raising dust in the process of operation; ⑤ The removing and road construction site shall be enclosed with color plate. ① After the main works completion of dike of each section, it is required to execute slope protection works and construction site vegetation recovery measures. Make full use of the available greening land within the management scope of dike and grow appropriate herbaceous plants according to water and soil conservation measures. ② Temporary construction project area The temporary works mainly include temporary construction layout area and construction warehouse etc., in the process of construction, it is required to consider the drainage measures of such part and excavate drainage ditch. During construction, it is The ESE conducts required to take temporary measures for protection. on-site supervision; After construction is ended, the construction unit must Influence of river course remove all surface buildings and hardened floor for Regulations are Ecological rebilitation on ecological recovery, clear the wastes caused by removing, Remove EMP Chapter 8 Contractor ESE, IEMC complied with; Day-to-day environment landscape from the construction remaining debris, which adverse the water and soil to crop growth, clear and remove them in time, conservation report centralized stacking and do its protection work well. has been prepared Loosen the surface earth and conduct supporting recovery to the filed irrigation and drainage ditches to improve the earth. ③ Management measures During construction, for strengthen construction management and supervision, regulate construction behaviour to reduce vegetation loss caused by construction land occupation and construction activities as far as possible and reduce the destroying to habitat of wild animals. Regulate construction behaviour, execute construction reasonably and orderly, optimize construction organization, implement gradual propelling construction - 22 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Potential influence Reference to Implementation Monitoring Monitoring Monitoring Activity Mitigation measures problems EMP and RAP responsibility responsibility indicator frequency in the same direction for the same construction section. For the adjacent construction section, the construction peak hours shall be staggered to avoid large-scale group construction in the same area and reduce the disturbance of disordered construction on the terrestrial ecological environment. During construction, strengthen environmental protection publicity education and propaganda on wild animal protection knowledge to the construction personnel in forms of announcement, pamphlet, blackboard newspaper and meeting etc, to improve the environmental protection consciousness of everyone; construction personnel are prohibited to hunt wild animals such as frogs, snakes, beasts and birds and engage in other activities hindering environmental protection. ① The flowers and trees in the middle of, and next to the road section shall be transplanted well and protected, it is not necessary to destroy them. It’s better to transplant them and supplement to plant according to the design. It is required to pay attention to protect trees and grassy areas in adjacent zone in construction period. ② Try best to build road within the range of red line in construction period and the mound and windrow shall not intrude into farmland nearby. ③ In construction period, it is like “ruins� due to The ESE conducts demolition, thus it is required to begin construction on-site supervision; orderly so as to avoid messy landscape along the line for Impacts of other the regulations are resistance landscape, the dam-board (wood, glass, iron construction activities on the EMP Chapter 8 Contractor ESE, IEMC complied with Day-to-day sheet etc.) can also be set to reduce landscape pollution. ecological landscape the water and soil ④ It is required to reasonably adjust the work of conservation report excavation and filling and avoid excavating and filling has been prepared earthwork during rainfall, so as to prevent water loss and soil erosion, water pollution and drainage pipe blocking. ⑤ On the premise of meeting the requirement of project construction, it is required to try best to save occupied land and reasonably arrange the construction progress. After the project is finished, timely clear construction site, empty occupied land and recover the original road and greening. ⑥ Reasonably arrange construction period, avoid - 23 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Potential influence Reference to Implementation Monitoring Monitoring Monitoring Activity Mitigation measures problems EMP and RAP responsibility responsibility indicator frequency construction in rainy season to furthest reduce water loss and soil erosion. ⑦ Reasonably design borrow area and spoil ground and borrowing and spoiling earth in scenic zone is not permitted; enhance the training management of construction personnel and it is required not to enter the scenic zone to cut down trees and plunder animals. ① The earthwork happened in construction period includes river channel excavation and backfilling, etc. The bottom mud in river channel is mainly the alluvium brought about due to surrounding catchment and water loss and soil erosion. The heavy metal content of bottom mud is far lower than the standard by monitoring, and it will not cause adverse effect to the soil and groundwater. After the bottom mud is excavated and sent to spoil area with natural withering, the yard absolutely can be restored as the equal of cut and fill in the XETDZ2. ② It is required to classify and contralized collect domestic garbage produced during construction, which is disposed by local sanitation department. The ESE conducts River course rehabilitation ③ After finishing the Project, it is required to demolish on-site supervision; Solid waste EMP Chapter 7 Contractor ESE, IEMC Day-to-day projects the temporary facility in construction area, clear the regulations are construction waste and all sorts of sundries, clear and complied with levelling surrounding domestic garbage, simple toilet and sewage sump, disinfect them by carbolic acid and quicklime, and make well recover construction site. ④ Contractors shall appoint person to take charge of collection of processing waste, and the scrap iron, waste steel bar and waste wood, etc. shall be piled in appointed place; the waste materials shall be recycled and disposed centrailly. ⑤ It is required to employ closeness or cover measures for the transportation of domestic garbage and construction material to avoid sprinkling of garbage, sandstone and soil aggregate alone the road or discard them in river channel. - 24 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Potential influence Reference to Implementation Monitoring Monitoring Monitoring Activity Mitigation measures problems EMP and RAP responsibility responsibility indicator frequency ① Orderly stockpiling as planned so as to avoid causing disorder land occupation, water loss and soil The ESE conducts erosion. on-site supervision; Impacts of solid waste EMP Chapter 7 Contractor ESE, IEMC Every day ② The domestic garbage shall be collected to refuse the regulations are transfer station by manual work, and then put into the complied with refuse landfills in Xuancheng. ① Road and pipe network project: take well preventive and protective measures, reasonably adjust and use of the equal of cut and fill, optimize construction technology, try best to reduce waste slag, take well protective measures for temporary block, drainage, sand setting and cover, etc. in the process of road construction, pay attention to green vegetation, improve and recover ecological landscape; set corresponding flood control and drainage facility for pipeline and subsidiary project area, protect well the temporary stock dump and drainage of construction site in pipeline construction area, and consider recovering vegetation. ② River channel rehabilitation: conduct disposal of excavation, and it is required to block first and spoil later. Consider to take the protective measures for the steep revetment and retaining wall of river channel and The ESE conducts Water and Water and soil conservation plant trees in both sides of river channel. Take the on-site supervision; EMP Chapter 8 Contractor ESE, IEMC Day-to-day in the region the regulations are soil loss ccofferdam blocking and protective measures during construction. complied with ③ It is required to carry out well strip topsoil for WTP, dewatering and sand setting in factory, cover earth and green in later phase, temporary mound blocking, dewatering and protective during construction. ④ Spoil area: it is required to take measures for intercepting and drainage system, temporary mound blocking, and block waste slag first and then give up. Rehabilitate the land and recover vegetation according to land use planning in later phase. ⑤ Take measures of temporary drainage and cover etc. in road construction area and construction site, clear and levelling the construction site, and recover farming or plant grass. ⑥ High-pressure gallery environment rehabilitation. Rehabilitate the land, conduct drainage and then - 25 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Potential influence Reference to Implementation Monitoring Monitoring Monitoring Activity Mitigation measures problems EMP and RAP responsibility responsibility indicator frequency ecological environment greening, constituting the overall structure of “big ecology� across the whole region. It is organically combined with the ecological “point�, “line� and “aspect� in XETDZ to forming a complete green ecological system. - 26 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Table 8 Environmental impact and mitigation measures in operation period Potential Reference to Implementatio Monitoring Monitoring Monitoring Activity Mitigation measures effects/problems EMP and RAP n responsibility responsibility indicator frequency ① Install ventilated sound insulation windows for a row of buildings of Jinda resettlement community along the street (2021 noise monitoring); ② It is required to leave 80 m distance from the red line of the main road for acoustic environment sensitive The regulations are XETDZ buildings like Maosheng Jingyuan complied with; When the Environmental Road noise effects ③ It is required to impose restrictions on the functions EMP Chapter 6 XETDZ the environmental Project is Protection of the area along the main road. Roadside buildings monitoring finished Branch office shall be planned and arranged rationally with optimized proposal acoustic design. Install sound insulation windows for the houses along the road. In addition, it is suggested to try to arrange warehouses, plants and green lands etc. within 80 m from the road. ① When ordering high-noise equipments, it is required to provide a explicated requirement for the noise value. Acoustic In addition, it is required strictly control the process of environment equipment installation to improve the installation accuracy. The regulations are ② Adopt sound insulation measures and vibration- XETDZ complied with; reduced measures etc. In the operating room, it is Environmental WWTP noise effects EMP Chapter 6 Project owner the environmental Monthly required to set the doors and windows of sound Protection monitoring insulation. For plant walls, it is required to adopt new Branch office proposal materials of sound insulation and sound absorption. The post operators shall wear earplugs, earmuffs and other protective devices. ③ Use and plan the land around the plant well, It is not suitable to construct dwelling buildings nearby The regulations are XETDZ Noise effects of pumping Purchase low-noise equipments with sound insulation complied with; Environmental EMP Chapter 6 Project Owner the environmental Monthly station measures and vibration-reduced measures Protection monitoring Branch office proposal - 27 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 ① Select low-noise equipments and for the vent nozzles the silencers are installed. ② Set hedgerow for noise insulation; plant trees around The regulations are XETDZ Noise effects of urban gas the station yard for afforesting; Around the technical Project Owner Environmental complied with; devices in plant area and at both sides of the road, the EMP Chapter 6 the environmental Monthly supply station Protection afforesting shall proceed too. monitoring Branch office ③ The station yard shall be far from the residential area. proposal ④ The pigging work shall be arranged at daytime as far as possible to prevent disturbing the residents. ① Select low-noise equipments The regulations are ② The garbage transportation time is avoided to be Bureau of followed with; Noise effects of garbage arranged in the rest time of people. In addition, it is Project Owner Environmental EMP Chapter 6 a environmental Monthly disposal required to control the speed. When passing the villages Protection monitoring and residential areas, it is prohibited to whistle at night XETDZ Branch proposal to prevent the noise disturbing the residents. Surface water ① WTP shall prepare the operation management environment regulations for wastewater treatment unit as well as post system, regulations concerning rewards and disciplinary sanctions etc., and maximally control the wastewater accidents due to operating faults. ② Keep the optimum water temperature, dissolved oxygen state and pH value for biochemical pool. ③ Control the quality of water intake and strictly The regulations are control the first-type pollutant discharge sources such as XETDZ WWTP effects on surface Pb, Cd, As and Hg to ensure the normal operation of complied with; Environmental EMP Chapter 6 Project Owner the environmental Monthly water body WTP Protection monitoring ④ WTP shall be provided with accident wastewater Branch office proposal storage pool. In case of any accident, the wastewater shall be discharged into the pool temporarily. ⑤ According to relevant regulations, in order to realize the effective monitoring on WTP, it is required to install the electromagnetic flowmeter and the online monitor for water inlet and outlet, as well as leave the monitoring position for sampling and shall be set up the logotype for environmental protection. - 28 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 ① Do well on the antiseptic and seepage-proofing work as well as daily management for the wastewater treatment devices to prevent pipe fracture, wastewater The regulations are XETDZ WWTP effects on ground station overflow and leaking or other accidents; complied with; Environmental EMP Chapter 6 Project Owner the environmental Monthly water ② Do well on the rain water collection and disposal in Protection monitoring Branch office initial stage. proposal ③ Improve follow-up management and strengthen the Underground tracking and monitoring on underground water. water ① Don’t set percolate treatment devices in all transfer environment stations. The garbage shall be packed in boxes and the percolate generated in compression process will be The regulations are stored in the collection well temporarily. Every day, it is XETDZ Effects of refuse transfer required to adopt fecal suction truck to carry them to complied with; Environmental EMP Chapter 6 Project Owner the environmental Monthly station on ground water landfills. The percolate entered the landfills will be Protection monitoring treated by the treatment system and will discharged after Branch office proposal reaching the standard. ② Construct seepage-proofing facilities for percolate collection wells well ① Improve the road management and pavement maintenance; keep the good operation state for the road; reduce the tail gas discharge of vehicle; improve the road operation management; inspect the vehicles on the road; it is prohibited the vehicles on the road with bad vehicle conditions, as well as overloading vehicles, vehicles with incompletely covered goods and easily The regulations are XETDZ Atmospheric Road effects on spilling vehicles running. complied with; Environmental EMP Chapter 6 XETDZ the environmental Monthly environment atmosphere ② It is required to strictly execute the motor vehicle Protection monitoring exhaust emission standard established by the state, Branch office proposal reinforce the degree of law’s execution of department of motor vehicles. It is prohibited to passing the motor vehicles whose pollutant emission exceeds the standard, so as to reduce the tail gas pollutant emission ③ Improve afforesting, and make use of plants for absorbing pollutants to reduce the pollution. - 29 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 ①Set up the isolation strip with strong anti-pollution capacity and the strong capacity to absorb harmful gas which is made of lofty trees around the factory area so as to realize the screen and absorption functions. ②Overridable stink pollutant sources shall be covered and sealed up to reduce the emission of bad smell ③ Improve the sludge management to be convenient for The regulations are immediate transportation and treatment. When XETDZ WWTP effects on complied with; transporting, it is required to prevent discarding or Environmental EMP Chapter 6 Project Owner the environmental Monthly atmosphere throwing on the way. The treatment method will be Protection monitoring appropriate to prevent secondary pollution. Branch office proposal ④ Set up the width of sanitary protection zone. Within 100 m area around the plant area (especially downwind), do not develop the residences, schools and other crowd projects. ⑤ Improve the maintenance and repair for biological deodorising system to ensure to maximally collect and effectively deal with the stink. - 30 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 ① Set up the natural-plant pharmaceutical spraying system on the upper part of receiver bin of the refuse transfer station, after receive garbage collection car into the unloading truck signal, automatically start the corresponding stall spraying system; use the natural-plant pharmaceutical spray to remove the dust and deodorize. ② The operations of processing garbage (discharging platform, material pit and pushing and pressing technology) of the whole refuse transfer station will be concentrated in the main power room in the project design of the refuse transfer station. In addition, the draught fan will be equipped on upper part of the main The regulations are XETDZ Effects of garbage power room to keep certain negative pressure in the complied with; Environmental workshops. After the bad smell is subject to the EMP Chapter 6 Project Owner the environmental Monthly disposal on atmosphere Protection deodorization treatment in deodorization tower for monitoring Branch office discharge, the bad smell will be discharged to minimize proposal the effect of bad smell from the refuse transfer station. ③ The temporary storage time will be shortened for the garbage in each refuse transfer station. It will be removed at least two times everyday to reduce the output of the bad smell. ④ Stink of public toilet will constructed according to the standards of Class I Flush PublicToilets of the Planning and Designing Standards for Urban Public Toilets (CJJ14� 87). In addition, when using the toilets, timely wash the toilets, spray disinfectants, place deodorants to minimize the generation of the stink pollutant. - 31 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 ① The sludge will be transported to Xuancheng Sanitary Landfills for Sanitary landfill disposal after being mechanically pressed and filtered . ② It is recommended to set up the special monitoring departments or full-time (part-time) personnel. The all process of sludge production, transportation, storage, treatment and disposal will be controlled and managed. Visual check; The personnel and the units without relevant operation XETDZ refuse disposal WWTP solid waste effects qualifications are prohibited to engage in the sludge Environmental EMP Chapter 7 Project Owner record; the Monthly transportation. The sludge transportation vehicles will Protection regulations are be taken such measures as seal-up, water proof, seepage Branch office complied with prevention and anti-spilling. Solid waste ③ After the gradual improvement of WTP normal operation and technical ways, the sludge will be subject to the detection and the sludge conforms to the requirements of Pollutant Control Standard for Farm-oriented Sludge (GB4284-84). Thus, it is available for agricalture usage and forestry usage Visual check; XETDZ Garbage should be collected manually at regular refuse disposal Domestic refuse Environmental intervals and finally dumped into the garbage landfills EMP Chapter 7 Owner record; the Monthly Protection through refuse transfer station regulations are Branch office complied with - 32 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 ① The maintenance and management of pipe network and pumping station should be implemented to prevent silt clogging due to sedimentation, which has influences on the discharge capacity of the pipes. ② The pumping station and WPT are applied in the double circuit power supply and a spare pump should be considered in design. ③ Strictly control the technical parameters of the treatment units such as water quantity, water quality, retention time and loading intensity etc. to ensure the stability of the treatment effect ④The maintenance and management of malodorous gas biological deodorization devices should be strengthened; moreover, to prevent the accident of XETDZ biological deodorization devices, a set of emergency Environmental Risk WWTP operational risk EMP Chapter 9 Owner Accident record Annually biological deodorization device should be established Protection for standby. Branch office ⑤The safety responsibility system and a set of complete work management system should be established to ensure that the tasks shall allocated to the individual, responsibilities are clear and regular inspectio. Emergency response measures for risk accidents should be formulated and with explicit emergency and rescue operating system should be clarified in case of any accident. ⑥The operation management and monitoring work on intake and outtake water should be strengthened, and the wastewater untreated and beyond limits should never be received and discharged. - 33 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 ① When selecting the route for this Protect, it is required to consider planning, environmental protection and safety. For the pipeline, it is required to strictly execute the provisions for various safety distances in the regulations. There should be a certain protection distance between the environmental sensitive points along the road and the pipelines t-There should not be large scale enterprises which produce or store toxic chemicals along the road. To prevent natural gas leaking alone the pipeline once, which will lead to the secondary pollution from fire explosion, or toxic gas emission, toxic liquid release. It is suggested that the safety distance between the pipe arrangement of this XETDZ Fire and explosion risk of project and surrounding environmental sensitive points The regulations are Environmental should be more than 20 m EMP Chapter 9 Project Owner complied with; Annually urban gas supply Protection accident record ② Adopt advanced technologies and equipments like Branch office pigging under constant gas supply and automatic closing block valve etc. ③ When choosing laying-out for pipelines, try to keep away from landslide, soft earth, mud-rock flow or other unfavorable consruction section. When coming across roads, rails and rivers, it is required to take corresponding protective measures, so as to minimize the accidents risk like the line fracture. ④ The accident prevention will start with management and operation for the Project. A set perfect systems such as take various measures, set up alarm system and prohibit accidents risk should be established.. A set complaint systems should be established and XETDZ Effectiveness of provide hotline phone number for appeal which will be Environmental shown at the main accesses of the project area. Each EMP Chapter 11 XETDZ complaint appeal system Protection case will be recorded and solutions should be given in Branch office Social written form within 7 days. environment Whether the public XETDZ The community environmental monitoring team with 3 participate in the Environmental persons should be set up to monitor the environmental EMP Chapter 11 XETDZ Protection environmental monitoring condition of the Project in operation period. Branch office - 34 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Effects of XETDZ2 development on surface Planning The accumulative solutions for effect have been listed in water environment, environmental Accumulative the XETDZ2 planning environmental report. underground water evaluation report The XETDZ adopts the best management practice environmental EMP Chapter 10 XETDZ APED of XETDZ2 is environment, air (BMP); establish the dialogue mechanism with the Annually effects stakeholders to monitor XETDZ2 development and approved; environment, acoustic organize various environment and ecological situation. meetings ecological environment - 35 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 6 Supervision and Monitoring Plan 6.1. Supervision for Environmental Management The Supervision Engineer Company is responsible for inspecting, supervising and auditing all construction activities to ensure that mitigation measures adopted in the EMP are properly implemented, and that the negative environmental impacts caused by the Project be to are minimized. The Supervision Engineer Company is required to designate Environment Supervision Engineer (ESE) who will be responsible for conducting daily on-site supervision on environmental mitigation measures executed by contractors. The key supervision contents of ESE include: Phase I: Preparation The job purpose of Phase I is to lay the groundwork for the successful execution of the Project. In this phase, the ESE will:  Review the EIA, EMP, Project’s design proposal and technical specifications and confirm that there have been no major omissions in mitigation measures;  Prepare the relative guidelines for contractors to implement the EMP;  Develop and execute a training program for all parties involved in construction activities. The main tasks in the phase I is as follows:  Review of Project Documents: The ESE will review the EIA, EMP, Project’s design proposal and technical specifications and confirm in writing that there have been no major omissions in mitigation measures. If any issues are identified, the ESE shall propose to the Project Management Office (PMO) updates for the EMP and the design proposal and technical specifications to solve these issues. Once approved by PMO, the ESE will update the EMP.  The ESE will review and approve the EMP Implementation Plan submitted by the contractors.  Environmental Supervision Checklist: The ESE will establish a comprehensive checklist to use for monitor the contractor’s performance during the Poject construction. The checklist will cover major aspects of the Project, the mitigation/control measures required and their implementation schedule.  Log-Book: The ESE will prepare a log-book to record each and every circumstance or change of circumstances which may affect the EIA or which may result in the recommendations made by the ESE to correct the non-compliance.  Environmental Training: The ESE shall design and execute a comprehensive training program for all involved parties including Supervision Engineers, PMO staff, contractor’s Safety and Environment Officer, contractor’s workers, etc.. The training content including environmental requirements of the Project, and how they will be supervised and audited, especially in the following aspects:  EMP: The requirements of the EMP, the agreed environmental monitoring checklists, the environmental monitoring forms, how non-compliance with the EMP will be handled, and all other key issues shall be covered. Particular attention will be paid to the specific conditions in each contract’s technical specifications indicating how the EMP is to be complied with. - 36 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012  Health and Safety: The health and safety requirements of the Project shall be clearly identified and communicated with the contractors and the PMO.  At the training is ended, the contractors will also sign a statement to confrim they understanding of the relevant environmental regulations, the EMP, the compliance framework, and health and safety obligations. The ESE shall sign a similar statement to confirm they understanding of the supervision responsibilities. These statements shall be submitted to the PMO and the World Bank. Phase II: Supervision of Construction Activities  Review and inspect all aspects of the implementation of the EMP by an independent, objective and professional manner;  Carry out random monitoring checks and review for records prepared by the contractor;  Conduct regular site inspections;Review the implementation of environmental protection measures according to the EMP and contract documents. The major non-compliance by the contractor will be cause for suspension of works and other penalties until the non-compliance has been resolved to the satisfaction of the ESE.  Inspect the contractor whether meet such regulations as the environment, public health and safety.  Review the effectiveness of environmental mitigation measures and project environmental performance;  Review the environmental acceptability of the construction method (both temporary and permanent works), relevant design plans and documents for application. Where necessary, the ESE shall seek and recommend the alternatives of least environmental impact in consultation with the designer, the contractor(s), and the PMO;  Verify the investigation results of any non-compliance of the environmental quality and the effectiveness of corrective measures;  Provide regular the audit results back to the PMO and CST according to the procedures for non-compliance in the EMP;  Provide a training every six months at least and every time there are new workers or new contractors coming into the site. The training content shall include EMP requirements, prohibited item, abide by the rules and regulations and environmental awareness.  Regularly monitor the performance of the ET, verify monitoring method and results. In case where the ESE considers that the SEO or any member of his team fails to perform duties or fails to comply with the contractual requirements, the ESE shall require the contractor(s) to replace the SEO or the member of the team;  Requires the contractor(s) to take corrective actions within a specified timeframe, according to the contractual requirements and relative procedures in the case of non-compliances or complaints, and can carry out additional monitoring if required;  Requires the contractor(s) to take the actions to reduce the impacts and follow the EMP procedures specified in case of non-compliance/discrepancies;  Requires the contractor(s) to stop activities which generate adverse impacts and/or when the contractor(s) fails to implement the EMP requirements/remedial measures;  The ESE shall ensure compliance with the requirements of the health and safety clauses in the contract documents. - 37 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012  The ESE shall identify the area with potential environmental issues through daily site visits, walks and visual inspections so as to implement regular on-site inspection and strictly supervise construction activities. The area of inspection shall cover both the construction areas and the surrounding environment of area affected by the contractor’s activities directly or indirectly.  The ESE shall have their own hand-held and portable monitoring equipment such as cameras, transport and other resources. Where additional monitoring is necessary to resolve the contentious issues or to impose penalties, the ESE can sign a contract with the third party to carry out specific monitoring work at the locations under review.  Where there is infringement of technical specifications, or contractual conditions, or non compliance with the EMP, the ESE shall be immediately inform the contractor’s Safety and Environment Officer (SEO). The ESE shall be also submitted all infringements to the PMO so as a part of the monthly reporting responsibilities.  The ESE shall be regularly with the contractor's (SEO) to jointly organize a environmental site inspection (e.g. weekly). The ESE shall take advantage of this opportunity to further training the contractors’ staff.  The ESE must take care of the field’s log-book for inspection by all persons participating in project management at any time.  The ESE shall also regularly review the records of the contractors to ensure that these data are up to date, factual and meet the EMP reporting requirements (e.g. environmental complaint register).  Complaints will be received by the contractor’s site office. The ESE shall be provided a copy of these complaints and ESE shall confirm that they has been properly solved by the contractor in the same manner according to issues identified during site inspections.  The ESE shall work closely with the contractors and the PMO in the event that an incident arises which was not foreseen in the EMP or EIA and confirm the satisfactory resolution to the incident. The ESE shall then update the EMP and the implementation guidelines, and training the contractors’ staff accordingly.  The ESE shall confirm the monthly payments for relative environmental protection activities as recommended by the ESE to the client. The ESE shall prepare the following written reports at least:  Weekly report on non-compliance issues;  Summary monthly report on covering key issues found from reviewing and supervision activities; and  Consolidated summary report from contractor’s monthly report The ESE shall also collect and report on data as requested by the PMO.  At the Project is end, the ESE shall prepare a final report summarizing the all findings from their work, the number of infringements, resolutions, etc. as well as advice and guidance for how such assignments should be provided in the future.  During the Project implementation, the ESE shall provide briefings on the Project progress, incidents, and other brief report associated with environmental management and supervision requested according to the PMO, environmental agencies and World Bank. These briefings should be submitted 1 time every six months at least. - 38 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 6.2. Environmental Management Monitoring The Independent Environmental Management Consultant (IEMC) will inspect, review, verify the overall environmental performance of the Project through regular inspections and review. This review will provide confirmation that the results reported are valid or not and that the relevant mitigation measures and monitoring program provided in the EMP are fully complied with or not. IEMC will review and audit the content of all aspects in the EMP in an independent, objective and professional manner through regular and random check the following items:  Review the implementation of environmental protection measures according to the EMP;  Review the effectiveness of environmental mitigation measures and the Project’s environmental performance;  On a need basis, test and verify the environmental acceptability of the construction method (both temporary and permanent works), relevant design plans and documents for application.  Inspect the investigation results of any non-compliance of the environmental.  Feedback audit results to XEDTZ and ESE team according to procedures of non-compliance in the EMP, and provide Supervision Engineer (ESE) suggests on actions of penalty, suspension of works or other punishment;  Prepare the semi-annual report submitted to the XEDTZ, APTD and the World Bank. 6.3. Environmental Monitoring Plan The environmental monitoring during project implementation stage shall be carried out by Environmental Quality Monitoring Consultant (EQMC) appointed by the Project owner. The EQMC will collect periodically environmental samplings (including water, air, noise, etc.) at selected locations. Such monitoring results, audits and sampling results shall be submitted to the Proponent so as to judge all kinds of index of the Project is in compliance with environmental regulations or not. Monitoring plans in this EMP context shall focus on the following key aspects:  The project owner commits to undertaking all kinds of monitoring programs related to the Project;  Monitoring will be probably implemented for aspects of the Project which have been predicted to have an effect on the environmental and social resources in the Project area, check item including air quality, noise, water quality, soil quality and socio-economic resources;  The project owner shall regularly carry out a trend analysis on monitoring data of various monitoring program so as to evaluate the success of the various monitoring programs is successful or not. This analysis will be used to determine if any changes or adjustments to the monitoring programs are required; and  Work with Environment authorities to design newest monitoring programs as necessary. - 39 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Based on the EIA results, it is concluded that during the Project implementation has particular ieffects on the surrounding environment under normal circumstances,. In general, these effect s can be decreased by environmental protection measures. Planning and implementation of XEDTZ2 development process will produce significant positive impact. The comprehensive monitoring program and evaluation plan has been listed in the EMP. In order to examine the effectiveness of the mitigation measures, shall carry out monitoring work to confirm the mitigation measures effectiveness over a reasonable timeframe. Monitoring must compare environmental parameters to the base line data and prescribed decision crite objectives in the EIA Chapter Section 1.4 Laws regulations or standards. 6.2.1 Introduction to Monitoring Procedures The monitoring program and monitoring frequency shall be designed to quantify the overall environmental performance of the Project works as well as any short-term impact due to intense construction activities. More specifically, as an key component part of the EMP, the environmental monitoring plan shall include the following objectives:  Confirm the impacts forecasted by environmental impact assessment processes, EMP development and monitoring processed;  Determine the actual extent and magnitude of the impacts;  Evaluate the effectiveness of the mitigation measures;  Identify and adjust any additional mitigation measures aim at the unexpected impact during project implementation; and  Keep tracking and update the monitoring methods and objectives of the environmental quality related to the Project according to newest regulatory criteria. During the peak construction period or at the request of the client, the EMS will also carry out additional measurements to monitor short-term impact. If non-compliance with environmental quality performance criteria is identified, additional monitoring shall be carried out. 6.2.2 Monitoring Parameters Table 9 Environmental Monitoring Program during Construction Monitoring Monitoring Factors Monitoring Place (Stretches) Indicator Who to implement Frequency Construction camps, Water Quality construction sites, sediment SS and Oil Once quarterly EQMC yard. Work locations with large operating equipment., unpaved Random sampling roads or space near sensitive Total Suspended during dry Air quality area or sensitive environments. IEMC Particulates (TSP) conditions aim at Incl. Fangbianwang Village, complaints Changqiao Primary School and Jinda Residential Area - 40 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Work locations with large operating equipment., unpaved Random roads or space near sensitive Equivalent samplingin large Noise area or sensitive environments, continuous sound noise of section IEMC Incl. Fangbianwang Village, level(LAeq) aim at the Changqiao Primary School and complaint Jinda Residential Area. Table 10 Soil and water conservation monitoring proposal in project construction period Execution Monitoring Monitoring Monitoring time interval and Monitoring Monitoring content standards and area method frequency organization regulations Current landform, terrain, 8~12 times per year; in flood Ground vegetation condition, rainfall season, observation condition, water loss and soil one monitoring for each month; method erosion area, water loss and one monitoring respectively prior (1 place) Project area soil erosion quantity to, during and after rain of urban roads One monitoring prior to and pipelines Survey Scope of prevention construction is starded; monitoring responsibility, effect of one monitoring for each year in method prevention measures, Plant construction period; one (Full range) survival rate under measures monitoring after construction is ended Current landform, terrain, 8~12 times per year; in flood Ground vegetation condition, rainfall season, observation condition, water loss and soil one monitoring for each month; method erosion area, water loss and one monitoring respectively prior Project area (1 place) soil erosion volume to, during and after rain of river regulation Scope of prevention One monitoring before Survey monitoring responsibility, effect of construction; in construction Unit with the Teahnical Construction prevention measures, period, qualification Specifications method period Vegetation survival rate one monitoring for each year; certificate for Water and (Full range) under measures one monitoring after construction for water and Soil Current landform, terrain, 8~12 times per year; in flood soil Conservation Ground conservation Monitoring vegetation condition, rainfall season, Project area observation monitoring (SL277-2002) condition, water loss and soil one monitoring for each month; of method erosion area, water loss and one monitoring respectively prior environmental (1 place) soil erosion volume to, during and after rain remediation under Scope of prevention One monitoring before Survey high-pressure responsibility, effect of construction; in construction monitoring gallery method prevention measures, period, Vegetation survival rate one monitoring for each year; (Full range) under measures one monitoring after construction Current landform, terrain, 8~12 times per year; in flood Ground vegetation condition, rainfall season, observation condition, water loss and soil one monitoring for each month; method Sub-project erosion area, water loss and one monitoring respectively prior (1 place) area of waste soil erosion volume to, during and after rain water Scope of prevention One monitoring before Survey treatment responsibility effect of construction; in construction monitoring method prevention measures, period, Vegetation survival rate one monitoring for each year; (Full range) under measures one monitoring after construction - 41 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Current landform, terrain, 8~12 times per year; in flood Ground vegetation condition, rainfall season, observation condition, water loss and soil one monitoring for each month; method erosion area, water loss and one monitoring respectively prior (1 place) soil erosion volume to, during and after rain Spoil area Scope of prevention One monitoring before Survey responsibility, effect of construction; in construction monitoring prevention measures, period, method vegetation survival rate one monitoring for each year; (Full range) under measures one monitoring after construction Current landform, terrain, 8~12 times per year; in flood Ground vegetation condition, rainfall season, observation condition, water loss and soil one monitoring for each month; method erosion area, water loss and one monitoring respectively prior (1 place) Construction soil erosion volume to, during and after rain area One monitoring before Survey Scope of prevention construction; in construction monitoring responsibility, period, method effect of prevention one monitoring for each year; (Full range) measures one monitoring after construction Current landform, terrain, 8~12 times per year; in flood Ground vegetation condition, rainfall season, observation condition, water loss and soil one monitoring for each month; method erosion area, water loss and one monitoring respectively prior Construction (1 place) soil erosion volume to, during and after rain temporary road area One monitoring before Survey Scope of prevention monitoring construction; in construction responsibility, period, method effect of prevention one monitoring for each year; (Full range) measures one monitoring after construction Table 11 Environmental Monitoring Proposal in Project Operation Period Monitoring Implementation Monitoring point (section) Indicator Monitoring frequency factor responsibility The monitoring will last 3 for Routine monitoring of the WWTP pH, CODCr, BOD5, WTP sewage draining outlet downstream years. Choose one day for competent department of drainage NH3-N monitoring each month. environmental protection The monitoring will last 3 for years. For the first year, choose 3 monitoring points at Fangbianwang, Routine monitoring of the one day for monitoring each WWTP odor boundary of wastewater pumping station, Stink, H2S competent department of month. For the second and third boundary of down wind direction plant environmental protection years, choose one day for monitoring each 3 months. The monitoring will last 3 for 4 monitoring points as refuse transfer years. For the first year, choose Refuse station of Beisan Road, refuse transfer Routine monitoring of the one day for monitoring each transfer station of Jinglin Road, refuse transfer Stink, H2S competent department of month. For the second and third station stink station of Tieshan Road and refuse environmental protection years, choose one day for transfer station of Baosha Road monitoring each 3 months. One respectively for Jinda resettlement Equivalent Routine monitoring of the Road noise community and Maosheng Jingyuan continuous sound Once for each season competent authorities of resettlement community level(LAeq) environmental protection - 42 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 7 Contractor Environmental Specifications Contractor Environmental Specifications provide a series of guidelines, processes and procedures to ensure that the ecosystem environment is not detrimentally affected by the contractor’s activities during the Project implementation. The Contractor is required to adhere to the guidelines established in this document. The general environmental issues associated with the contractor activities include the following:  Site management  Fuel and material storage and handling  Dust and noise nuisance control  Sewage management  Waste management The environmental issues related to specific project activities such as soil and water conservation plan, emergency response plan can see the following chapters and sections. 7.1. Contractor’s Environmental Protection Plan The Contractor must be provided with a copy of the EMP and the EMP should the EMP "included in the bid documents. Prior to theconstruction is started, the contractors are required to submit a site-specific Environmental Protection Plan (EPP) for their work so as to the ESE and XEDTZ for review. The EPP shall cover the generic environmental impact mitigation measures (as well as specific mitigation measures such as emergency response), main including, but not be limited to, the following items:  Overall construction site plan, showing work areas, fuel storage areas and fuel supply areas, parking lots, equipment maintenance areas, material storage areas and camp areas.  Waste management plan;  Dust control plan;  Noise control plan, and  Solid waste management 7.2. Site Facilities Contractor shall ensure that the construction camp a certain distance away from the surrounding industry. A layout plan for construction activities needs to be developed and approved by the ESE. 7.2.1 Labour employment � If appropriate, the employment of labors should give priority to local labors. � The contractors should publicize appropriate work positions to the villages and towns in XEDTZ2. � The construction and the staff members should have legal contracts for employment � The contractors should provide the construction workers with the educational training of environmental protection and occupational health and safety. 7.2.2 Requirements for Camping Site - 43 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 � The contractors should provide appropriate and safe quarters for the construction workers. � Independent and perfect bath facilities (toilet and shower) should be provided on the camping site for male and female workers respectively. Sufficient water supply, soap and toilet paper, etc. should be provided in the toilet. All these facilities are required to clean and sanitation, available for use. Toilet should be indicated with "Male" or "Female" obviously � The kitchen at the camping site should have clean water and should be in hygienic condition. � The domestic sewage of the camping site should be treated in the septic tank at least and should not be directly discharged into any waters. � The camping site should provide medical and emergency facilities. First-aid kit should be provided at any camping site and managed by specially assigned persons who should receive full first aid training and obtain a corresponding qualification and could send the injured or the diseased to local hospital in time. The above medical and health supplies should be replenished in time once used. 7.3. Code of Conduct The “Code of Conduct� shall be established for the construction workers with emphasis on appropriate behavior, the drug abuse and alcohol is strictly prohibited and abide by the relevant laws and regulations so as to reduce the influence on the society. Each worker should be informed of the “Code of Conduct�. The “Code of Conduct� for construction workers should be also known to the local community. As for failing to obey the “Code of Conduct�, disciplinary action should be accepted. The "Code of Conduct" includes but not limits to the following measures:  All the staff members should obey the national laws and regulations;  Hazard materials and dangerous weapons are prohibited in the construction sise;  Pornographic materials and gambling activities are prohibited in the construction sise;  No fighting is allowed;  No interference to the production and life of the neighborhood as well as the local people;  No disrespect to local traditional culture, custom and traditional activities;  Smoking is only allowed in appointed area;  Appropriate clothes and personal hygiene standard;  Appropriate sanitary condition for the dormitory;  The workers should obey the relevant “Code of Conduct� when visiting the neighborhood as well as the local people. Prohibition The following activities are prohibited on the construction site or nearby: • Injury to the wild animals and the villagers livestock in the adjacent areas; - 44 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 • Capture of protection animals or collection of protection plants; • Purchasing protection animals as food; • Interference and destruction of objects with architecture or history values; • Bonfire; • Drinking in working hours; • Mechanical maintenance (replacement of engine oil and lubricant) outside the specified area; • Dumping of refuse outside the specified area; • Driving in danger on local road; • Not safety dressing (e.g. safety boots and crash helmet)during the construction; • Causing interference to the people nearby; • Leakage of pollutants, e.g. oils; • Burning refuse. Any constructor(s), office worker or other staff member, if found breaking above-mentioned regulations, should be punished by the discipline such as by means from oral criticism to dissolution of labor contract according to the severity. 7.4. Health and Safety  The contractors should ensure the projects conforming to all the national and local safety regulations as well as the other measures about damage avoidance.  Prior to the construction, the contractors should provide safety training for the workers.  Sufficient dayligh64t and night illumination should be provided;  The fence needs to be provided around the site to prevent interference. This needs to be checked and maintained during the construction;  No irrelevant personnel is allowed to enter camp site without approval by management staff of the contractor(s);  The camping site should be provided and equipped with fire-protection equipment such as fire extinguisher;  The contractors should provide the workers with enough personal safety protecting devices, (e.g. protective glasses, protective gloves, protective mask, dust cover, safety helmet, ear protectors, steel helmet and so on), and ensure them to be used on the construction site.  The safety rules, the emergency pre-plan and the emergency contact information should be indicated on the bulletin board at the construction site.  All the places with potential damage should be marked for warn.  Safety protection distance should be determined according to the relevant regulations.  The contractors should take all reasonable measures to prevent the risk rising and ensure the construction site and all the camping sites provided with fire-protection equipments.  Any engineering for requiring open flame could only be performed at the places approved by and in supervision of the ESE. And meanwhile, the corresponding fire-protection equipments should also be in place.  The contractors should provide all the workers with annual physical examination.  The contractors should also provide the training of personal basic hygiene and epidemic prevention, including respiratory disease and infectious disease.  The contractors should carry out the educational activities about disease prevention and cure (esp. the protection against AIDS and venereal disease), including the propaganda on - 45 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 the construction site and neighborhood in the form of notification and training class for propaganda.  The contractor(s) should provide the workers with basic first-aid service and emergency measures.  The contractor(s) should establish necessary warn and speed bump etc. in the construction road (if any) near local communities to ensure the traffic safety of residents nearby. 7.5. Storage of Fuel, Oils, Dangerous and Toxic Materials  All fuels for construction site should be stored in the fence, Storage area shall be 110% of the capacity of the fuel storage container. The fuel storage area must not be located near (i.e. distance water within 100 m) any water resource.  The hazardous materials should also be stored in specifically designed storage facilities. Temporary storage provision needs to be made for the hazardous materials such as fuels, oils and paints.  Access to this storage area should be only limited to relevant personnel.  The store site must be protected from vehicle damage and must be regularly inspected for leaks, damage or pollution.shall also be  Machine and equipment repairs must only take place within the confines of the contractor’s camp. An operating surface (i.e. concrete floor in fende area) must be designed properly to insure that the oils, fuels, etc. collected into an appropriate containers. Where there have been oils/fuels leakages, the contaminated soil must be removed and disposed of at an appropriately permitted site.  The precautionary measures must be always taken to prevent the pollution or erosion of the soil and water by grease, oils, fuels, solvents, chemicals, etc.. 7.6. Waste Management  During the construction, the Contractor(s) must make provision for the appropriate removal of waste from the site to a permitted waste disposal facility in a proper manner at any time. The accumulation of construction waste materials shall be reduced as far as possible.  All domestic waste generated by the activities at the contractor’s camp must be stored in either refuse can (i.e. 210 l steel or plastic drums) or in a waste skip car. The Contractor(s) must ensure that these refuse receptacle are emptied on a weekly basis, or as and when required.  All refuse shall be immediately deposited into refuse can or the waste skip car. No litter must be left in the work areas or contractor’s camp.  Construction waste must be stockpiled in the contractor’s camp and the Contractor(s) and the contractor shall be responsible for handling. The construction waste contaminated must be dealt with separately.  The burning of waste at construction site shall be prohibited. - 46 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 7.7. Wastewater and Storm Water Managemen  Wastewater from construction site and camp are not allowed to be directly discharged into surface water body;  Domestic sewage must be properly treated through (e.g. septic tank), prior to discharge.  Stormwater must be implemented of measures to dissipate its energy so as to drainage into the river;  The stormwater runoff exhaust from the construction site (the temporary drainage facilities) shall be evenly distributed as possible; and use of gabions, ripple beds and swales to reduce the velocity of water runoff. 7.8. Control of Noise  Limit construction times to the day times;  No noisy activities during construction near local communities at weekend shall be insured;  Staff at site, visitors and construction workers on the site must be equipped with appropriate hearing protection measures to ensure noise impacts do not damage the persons hearing.  The ESE must regularly inspect the construction site to ensure compliance with the “Occupation Health and Safety�. 7.9. Construction Stage Public Information Communication Community (Public) Participation and Complaints Register (CR)  During the construction, the contractor(s) should remain open communication with the local governments and the people of the relevant community.  Prior to the construction, the Constractor(s) should publicize the Project information to the influenced parties (e.g. local government, enterprises and residents) in the form of community meeting.  All the construction sites should be clearly marked about the project information, including but not limited to: a) Project overview; b) Construction plan; c) Major construction activities; d) Principal environmental problems and mitigation measures; e) Names and telephones etc. of the Project manager, the supervision engineer and the environmental protection personnel.  The contractor(s) and the ESE should regularly communicate with major sensitive receptors, so as to minimize the negative influence on these objects as far as possible .  All the contractor(s) should provide the workers with the training about neighborhood relationship maintenance, communication, local custom and the “Code of Conduct�.  Relavent complaints channel information must be disclosed at the entrance of the site;  A complaints register must be kept on site in the main construction camp office. All complaints, issues and concerns shall be incorporated in feedback reports submitted to ESE and XEDTZ for check and approve; - 47 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012  ed to the relevant parties to ensure that the complainant is satisfied. 7.10. Physical Cultural Resources  Aim to provide training for the workers about historic relic education as well as historic relic discovery and protection procedures.  If you have found the related resources a) The contractor(s) shall stop the construction immediately and protect well the scene; b) Report to the ESE and the owner as well as the local cultural resources authority; During the investigation made by the local authority, the contractor(s) should take appropriate measures to protect well the historic relic scene and implement weather precaution; c) Only after consent by related authorities, the contractor(s) can resume the construction. - 48 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 8 Water and Soil Conservation Plan In order to ensure the successful implementation of water and soil conservation measures and carry out the legal requirement that water and soil conservation facilities of constructing projects shall be designed, constructed and put into used concurrently with the main project, for water and soil conservation, it is necessary to take the measures as organizational management and technologies to ensure the project implementation through administrative and legal means. The implementation of guarantee measures of this proposal include setting corresponding organizations, carrying out the management based on project legal person system, bid system and supervision system in project construction period as well as ensure capital resources and strengthening monitoring management. After this water and soil conservation proposal is approved by the water administrative competent department, the content and investment of controlling measures established in this proposal will be included in the preliminary designing documents of the main project, separately forming in chapter. Any significant modification on the design will be reported to the original inspection authority for approval. The original approval water administrative competent department should participate in the inspection of the project preliminary design, so that the water and soil conservation measures can be carried out successfully according to the detailed design requirements. 8.1. Construction tender For the implementation of the water and soil conservation works, it is required to execute the tender system. The construction unit, engaging in main works construction as well as water and soil conservation project, must have the technicians who are familiar with the water and soil conservation business and all technical requirements for water and soil conservation measures. In addition, strengthen the water and soil conservation training for construction team; strengthen the water and soil conservation awareness of the constructors; to improve the technical level and environmental awareness of the constructors; and give priority to the preventive work for water loss and soil erosion. In the project construction, the construction shall be carried out strictly following the approved water and soil conservation works proposal. It is required strictly execute Technical Specifications for Water and Soil Conservation of Developing Project as well as the technical standards and specifications related with the comprehensive treatment for water loss and soil erosion. 8.2. Water and Soil Conservation Works Supervision Water and soil conservation supervision is an important measure to realize the water and soil conservation raised in this proposal. Water and soil conservation supervision will provide technical supports and guarantee for the construction units to effectively prevent water loss and soil erosion, so as to be ensured to reach the preventing and treating objectives raised in this water and soil conservation proposal and meet the special acceptance requirement for water and soil conservation. According to the special situation of this Project, water and soil conservation supervision will be included in the main project supervision for consideration. to strengthen the - 49 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 construction management. When accepting the water and soil conservation facilities, the main project supervision unit shall provide the supervision data related with water and soil conservation of this project, including videos and images, etc.. 8.3. Water and Soil Conservation Monitoring During the service period of this proposal, will strengthen the monitoring on water and soil conservation, monitor the dynamic change of water lose and soil erosion and the effect of water and soil conservation measures in project construction period, supervise and guide the implementation of water and soil conservation proposal and prepare corresponding supplemental treatment proposal for water and soil conservation measures to be supplemented. The construction unit will entrust the water and soil conservation monitoring unit with the corresponding qualification certificates to provide the report according to the monitoring content, method, time inveral and monitoring achievement as prescribed in the proposal regularly and the annual monitoring report shall be able to guide the construction of the next year. When designing the planning targeted year, the monitoring unit shall submit water and soil conservation monitoring report to present the implementation situation and effects of water and soil conservation measures and analyze the realization situation on the preventing and treating objectives for water loss and soil erosion. The monitoring report shall be able to meet the completion acceptance requirements for water and soil conservation. 8.4. Construction Management Water resource authority supervises the implementation of water and soil conservation plan. During implementation, project owner shall cooperate with the water resource authority and accept the supervision. The project owner shall keep a record of the supervision and take corrective actions as required. During construction, quality check shall be conducted in a timely manner. Rectification action must be taken by the contractors until it is satisfactory to the quality standards. For greening measures, special attention shall be paid to cultivation and maintenance and ensure survival rate to maximize the benefits of greening measures to water and soil conservation. 8.5. Completion Inspection and Acceptance for Water and Soil Conservation According to the requirements of “three-concurrent� system for water and soil conservation, when the completion acceptance is carried out for main works, the water and soil conservation facilities shall be accepted concurrently. After the water and soil conservation facilities passing acceptance and, the main works is available to put into operation. If the water and soil conservation facilities are unaccepted, the main works is not available to put into operation. During the acceptance, it is required to submit the acceptance report and comprehensively assess the quantity and quality on implementation of water and soil conservation works so as to Summarize the successful experience and insufficient sections in implementation of water and soil conservation works. In case of any overdue section or defective works, it shall be ordered to be redesigned or be replenished to perfection till the water and soil conservation measure are able to reach the acceptance indexs according to the water and soil conservation level two preventing and controlling standards. - 50 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 8.6. Capital Source and Usage Management In accordance with the principle of “who develops who will project, who causes the water loss and soil erosion who will treat� and the provisions of Article 32 of Law of The PRC on Water and Soil Conservation, developing production construction project or engaging in other production construction activities causes the water loss and soil erosion, which shall be treated. Special water loss and soil erosion prevention and treatment shall be implemented under the organization of the water administrative competent department. Management Methods for Collection and Usage of Water Loss and Soil Erosion Compensation will be prepared by the Ministry of Finance under the State Council, the department in charge of price under the State Council jointly with the water administrative competent department under.the State Council, The water and soil conservation expenses incurred in the construction and production periods of production construction project shall be treated according to the unified national financial and accounting system. - 51 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 9 Emergency Response Plan 9.1. Risk Response for Pipelines Accident (1) Human factors are often the main cause of accidents, and careful management and managing people’s performance is an important part of accident prevention. Management of people will include to strengthen the awareness of the staff and operators to make them more responsible and proactive; to carry out on-the-job training to the operators in a systematic manner to make them familiar with the work programs, procedures and specifications, and to hold them accountable for their duties and obligations; to assign a safety patroler and carry out regular inspections and maintenance to address accident-prone parts in addition to regular checks by their operators in order to identify and address problems in a timely manner. (2) Careful reviews of the engineering designs are advisable. Design of the facilities involving safety, health and environmental aspects shall be carefully reviewed in accordance with relevant specifications and standards. Supervision and management shall be carried out carefully during the course of construction to ensure the quality of construction. (3) In the event of an accident, notice shall be given to concerned departments in a timely manner and effective measures be taken to minimize the impacts on the surrounding environment and damage to people's lives and properties. 9.2. Risk Response for Gas Station Accidents (1) Preventive Measures during the Preparation and Design Stage  Location of the alignments of the utilities shall avoid residential areas and those with complex geology, in order to reduce injury and property damage in the event of a natural gas leak and fire/explosion accident and the probability of hazards.  Wherever such buildings and areas with many people are unavoidable, higher safety factor shall be applied in the design to increase the thickness of the pipeline wall and provide for higher capacity against the external impact in an accident. According to the design code, the Engineering Design Code of Gas Utilities (GB 50251-94), areas where the gas pipeline passes through are to be categorized into three classes per the number of households and building density along the alignment, and the design of the utilities shall be carried out accordingly.  In case of an emergency, the natural gas will be vented by flaring as designed.  An emergency shutdown system is designed. Emergency shut-off valves are designed at the inlet and outlet of the gas supply station, which may be directly shut off in the event of some obvious faulty situations. The designed SCADA system will enable remote shutdown of the valves and complete shutdown of the entire system.  In order to prevent and reduce potential corrosion of the gas pipelines, epoxy powder coating will be applied at the external walls of the utilities, which will be added with electric current and cathodic protection as designed.  The facility is designed with a safety relief system, which may be operated automatically or manually to vent the system in the event of an overpressure.  The design teams are to strengthen their co-ordination to address the connections and - 52 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 interfaces so as to minimize mis-matched designs or other design problems for an integrated and quality design of the facility. (2) Preventive Measures during Construction  To strengthen supervision and construction management to ensure the coating quality of the utilities;  To establish a QA/QC system for the construction period to improve the performance of the construction inspectors and strengthen the means of inspection.  To develop and enact operation rules and management regulations, so that defects can be found and corrected in a timely manner, and the process be well recorded.  To carry out hydrostatic test to eliminate defects existing in welds and materials as many as possible so as to enhance the pipeline safety.  To select experienced contractors for the construction and an excellent third-party for careful oversight of the construction quality to reduce problems in construction. (3) Prevention Measures during Operation  To carefully control the quality the natural gas and regularly clean the utilities to eliminate stagnant water and dirt inside the pipe to reduce corrosion.  To measure the pipe wall thickness every three years and carry out repair and replacement to the pipe segment with severely thinning wall in a timely manner to avoid pipes burst accidentl  To check the pipeline safety protection system (such as a cut-off valve, safety valve, venting system, etc.) every six months, so that the pipeline could be handled safety in the event of an overpressure, and any harmful effects would be minimized.  To provide signs where the utilities cross a railway, highway, or river, which are not only clear and explicit, but also visible from different directions and different angles.  To carry out more frequent inspection of the utilities and to improve the effectiveness of the patrol, through daily checks of the utility zone on the land surface conditions and human being activities. Any human being behavior to the jeopardy of the pipeline safety shall be be promptly stopped with appropriate corrective measures and a report to the superior.  To carry out inspection on pipelines crossing rivers and other sensitive areas every three years.  To take particular care of the river crossing segment of the pipeline during flood seasons.  To pay attention to fire prevention during the course of venting in an accident at the sub-station of the transmission. (4) Management Measures  Operating manual and maintenance manual for normal, abnormal or emergency situations shall be prepared before the utilities are put into operation. People to carry out the operation and maintenance shall be trained and certified before they are assigned to a position. Any operator or service person shall be provided with a certificate for his/her intended position. Such provisions are intended to prevent an accident due to serious misoperation.  To formulate emergency operation protocol, which shall specify the steps to be taken in the event of a pipeline accident, the required repair progress, and how to constrain the impact of the accident. Safety issues related to the pipeline operators should also be addressed. - 53 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012  Safety education activities of the operators shall be carried out on weekly basis to improve their safety awareness and build up their capabilities to identify abnormal phenomenon before an accident and to take appropriate measures.  To carry out awareness campaigns of safety facilities to the nearby communities, to inform on and implement the Regulations to Protect Oil and Natural Gas Utilities, so as to avoid accidents due to damage by a third party.  To provide inspection program and maintenance methods to important instruments and equipment. To carry out scheduled and periodic maintenance. To keep a specialized archive (including maintenance log file) with all the documentations. (5) Emergency Plans  The purpose to prepare an emergency plan against the risks and potential accidents is to be efficient and effective in the event of a risk-related accident, so that rescue can be carried out in an orderly manner, the situation can be well controlled, and injury and/or property loss due to the accident can be minimized. 9.3. WWTP Preventive Measures Against Accidents (1)Pipe network maintenance measures WWTP stable operation is closely related with the network maintenance. It is required to attach importance to pipe network, pumping station maintenance and management to prevent sediment deposing or clogging which may influence the pipe discharge capacity. The pipeline link shall prevent the leakage polluting underground water or hollowing out the foundation. The clogged shall be dredge in time to ensure the smoothness of the pipeline as well as maximally collect domestic wastewater and industrial sewage. In the design of main pipe and branch pipe, it is required to choose the appropriate fullness and minimum design flow speed to prevent sediment deposing. The WWTP inflow pumping station shall be provided with special personnel to care. At ordinary times, the maintenance of mechanical equipments shall be strengthened. The maintenance shall be timely carried out to prevent resulting waste water flowing into the rivers nearby as soon as the accident occurs. The strict maintenance system shall be formulated for the sewage pipe network.. The users shall strictly execute relevant national and local discharge standards. Especially, it is required to reinforce the management of the inflow water quality of accepted industrial wastewater, so as to ensure the WTP inflow water quality. (2)Preventive measures of pollution accidents The WWTP accidents originate from the equipment faults, overhauls or the deterioration of treatment effect due to the change on technical parameters. The preventive measures include: 1)WWTP adopts double-lines power supply. Prepare well the spare equipments like water pump or air blower for standby. The mechanical equipments shall use the high-quality products with reliable performance, imported products preferable. 2)In case of any WWTP shutdown accident, the big users of drainage units shall be regulated production to reduce the wastewater drainage and start accident emergency pool. - 54 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 3)In order to rapidly response the WWTP accidents to recover to the normal operation, it is required to leave corresponding buffer capacity on the volume of main hydraulic structures with corresponding equipments (such as reflux pump, reflux pipeline, valve and meter etc.). 4 ) WWTP shall seclect to use the advanced equipment such as various mechanical equipments and meters which are the high-quality, low-accident rate, convenient for maintenance. The key equipmentshall be required to provide two sets namely one for application and one for standby. The damageable parts shall be provided with standby parts, so that the exchange is in time in case of any accident. 5)The technical parameters of the treatment unit such as water quantily, water quality, retention time, loading strength shall be strictly controlled to ensure the stabilization of the treatment effect. Shall provide with the automatic analyzing and monitoring instrument for flow and water quality to regularly take samples and monitor. The operating personnel shall be adjusted in time to make the equipment in best condition. In case of any abnormal circumstance, it is required to take preventive measures as soon as possible. 6)The safe operation specification shall be established. The daily work shall proceed strickly according to the regulations. The theoretical knowledge and operation skill for the WWTP personnel and carry out shall carry out regularly the training and inspection. 7)The operation management and the monitoring on intake and outtake water shall be strengthened. The unqualified water is prohibited to be discharged. 8) The wastewater pumping room shall be equipped with toxic gas monitoring instrument as well as necessary ventilating devices. 9)The safety responsibility system shall be established. Shall set up a set of complete system in aspect of daily work management to ensure that the work shall be carried out by each personnel with clear responsibilities and regular inspection. 10)The emergency measures of risk accidents shall be prepared and shall explicate the emergency and rescue operation system in case of accidents. 9.4. Countermeasures and Emergency Plan for Accidents When collecting, transporting and treating WWTP wastewater, in case of any accident, it is necessary to carry out the emergency treatment according to the proposal prepared in advance. The content of emergency proposal as follows: (1)General situation of risk source Detailed risk source type, risk source size and location (2)Emergency protection area Including the water quality control area in Zhouhan River downstream. (3)Emergency organization The accident emergency organization shall be responsible for the comprehensive command on the accident field. The professional rescue team will be responsible for repairing or removing for the accident or fault. (4)Mergency facilities, equipments and materials Shall provide with the relevant spare equipments, tools and materials. (5)Emergency communication, notification and transportation Shall provide with the contact communications way under the emergency state to timely inform all relevant departments, must control well the accident field and determine the - 55 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 rescue team will arrive in time. (6)Emergency protective measures Control well the accident to prevent expansion or chain reaction; close relevant gates and start accident water pool to reduce the damage. (7)Emergency condition termination and recover measures Provide with emergency condition terminator, deal with the aftermath of accident field to rapidly recover WTP normal operation. (8)Emergency environment monitoring and assessment after accident Monitor the surrounding water environment of the significant accident field and assess on accident property, parameter and its aftermath, so as to provide decision reference for relevant departments. (9)Personnel training and exercise After the emergency plan is formulated, it is required to arrange relevant personnel to take part in training and exercise at ordinary times. (10)Record and report Shall set up the special record for accidents and it is required to establish the accident archive and report system and to arrange special full-time or part-time personnel in charge of management. - 56 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 10 Cumulative Impacts Mitigation and Follow-up Assessment Plan 10.1. Cumulative Impacts Mitigation Abatment of Air Pollution To layout admitted industries in a rational way in accordance with policies on the planned leading industries and the industrial land use plan; To strengthen the industrial exhausts and pollution control, covering following five aspects: To promote clean production; To optimize the energy utilization structure, taking advantage of adequate natural gas supply from the Gas Transmission Program to prioritize the use of natural gas; To ensure effective treatment of the various categories of process exhausts of the industries; To develop and consummate the environmental management and supervision; To enact an effective and efficient accident and emergency emission mechanism; and To provide vegetated areas in a rational manner. As XETDZ2 is close to the Jingting Mountain Scenic Area on the east, an ecological shelterbelt consisting of tall trees, bushes and turf of a minimum width of 50 m shall be developed, forming distinct levels of green barriers along the eastern boundary of XETDZ2, to ensure that the development of XETDZ2 would not happen at a cost of the environmental features of the Scenic Area and would not affect the landscape consistency. Abatment of Water Pollution Separte drainage systems shall be applied at the industrial land use and urban areas of XETDZ2; Clean production processes shall be promoted among the indistries in the region; A wastewater discharge application and licensing system shall be fully implemented; To mandate compliant discharge that no industrial wastewater of any individual industry shall be discharged into the Changqiao WWTP for treatment until it is pretreated by the industry and meet the Level 3 discharge requirements, to ensure compliance discharge; To strengthen the conservation of the water environment in the region; and To carefully develop and follow the emergency programs of accident emissions. Noise Control To control industrial noises by rational layout of the industries and compliant noise level at plant boundary. To control construction noises by reasonable scheduling of the construction activities. To control traffic noise by having no new residential buildings, schools and other noise-sensitive buildings within 50 meters from ROW of mobility arterials on both sides in the plan, and instead by providing green belts 20 to 50 meters wide, in order to take the advantage of the setback and the vegetation for abatement of the traffic noise. Tp control noise from social life. Solid Waste Management and Disposal To strengthen the management of general industrial solid wastes by recycling the waste materials, diversify the utilization ways, and to strengthen the management of the trasaction of industrial solid waste disposal by developing an information system tracking on the industrial solid waste generation, - 57 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 flow, storage, disposal, and transaction to encourage waste recycling and reuse among industries of the region. To enact a hazardous waste generation, reporting and registration system, and a facility operation license system on business to storage, collect, disposal and reuse of hazardous wastes, in order to effect a whole process management covering the collection, transportation, storage, treatment/reuse, and disposal of the generatated hazaroud wastes. To develop municipal solid waste collection system, storage systems, transfer and transport systems, and disposal systems to ensure non-hazardous disposal of the domestic wastes. Recommended Priority Ranking of Industries for XETDZ2 Efforts shall be made to create incentives so that less polluting industries may settle down and develop in the zone, following the sectors of the leading industries the industrial development program of XETDZ2, the concept of recycling economy and the vision of an ecologically sustainable development zone. During the future development of the industrial areas, requirements of developing the leading industries and sectors should always be satisfied by following the development plan to upgrade traditional industries and cultivate high-tech industries. Any industry with low resource utilization efficiency and high emissions of pollutants shall be restricted. Any industry inconsistent with XETDZ2’s industrial program shall be limited from access to the region, and any heavily polluting industry or having high water use shall be prohibited and not admitted. According to the industrail development orientation of XETDZ2, recommended control policies were given to a variety of industrial sectors, as shown in Table 7.4-3. Table 12 Incoming industry control list of recommendations Sector Code Industrial Sector Policy Recommendation 37 Transportation equipment manufacturing Priority access 34 Metal manufacturing Priority access 39 Electrical machinery and equipment manufacturing Priority access 31 Agro- food and by-product processing Limited access 27 Pharmaceutical manufacturing Limited access 221 Pulp industry To deny access. 19 Leather, fur tanning and processing To deny access. 27 Chemical materials and chemical products manufacturing To deny access. 08 Ferrous metal mining and selection To deny access. 09 Non-ferrous mining and selection To deny access. 32 Ferrous metal smelting and processing To deny access. 33 Non-ferrous metal smelting and processing To deny access. Per Table 12, industries having preferential access to XETDZ2 are transportation equipment manufacturing, metal manufacturing, electrical machinery and equipment manufacturing, and communication equipment, while access will be controlled for agro-food and by-product processing, and pharmaceutical manufacturing, and will be denied for pulp and paper industry, leather, fur tanning processing, chemical raw materials and chemical products manufacturing, ferrous (non-ferrous) metal mining and selection, and ferrous (non-ferrous) metal smelting and processing. 10.2. 10.2 Follow-up Assessment Plan Develop follow-up assessment is to analyze and evaluate the environmental impact caused due to plan implementation on the XETDZ2, so as to verify correctness of environmental impact - 58 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 assessment and judge the effectiveness of mitigation measures, and put forward the improvement measures. All environmental element evaluated in advance for the environmental impact shall be purposefully moitored, examined and counted so as to determine their actual variation which is compared with the predicted variation treated by environmental protection facilities in the environmental impact statement, meanwhile, compare the actual environmental impact caused by XETDZ2 planning implementation with predicted impact as a whole, and analyze and evaluate the results to further analyze its cause, at last, further rectify, develop and perfect the planning scheme and all measures by evaluating the impact of environmental impact assessment effect . In addition, in the process of planning implementation, conduct a follow-up assessment of environmental impact across the whole XETDZ2 according to the environmental index system content every 5 years, so as to evaluate whether new environmental impact is produced on the XETDZ2 and put forward more comprehensive remedial measures. Please see table 10-1 for the main review and the content of follow-up assessment on the XETDZ2. Table 13 Main content of follow-up assessment on the XETDZ2 S/N Item Work content Main purpose and significance Atmospheric environmental monitoring Master the variation trend of 1 and retrospective assessment atmospheric pollution Surface water environmental Master the variation trend of 2 monitoring and retrospective surface water pollution Environmental assessment monitoring and Soil environmental monitoring and Master the variation trend of soil 4 retrospective retrospective assessment pollution assessment Groundwater environmental Master the variation trend of 5 monitoring and retrospective groundwater pollution assessment Noise environmental monitoring and Master the variation trend of noise 6 retrospective assessment pollution Investigation of enterprise pollution 7 source Investigation Investigation of enterprise 8 of pollution Master basis data environmental protection measures source Investigation of cleaner production 9 level Ecological protection engineering 10 construction 11 Review on Air pollution control Reclaimed water reuse and water Effectiveness of environmental 12 environmental pollution control protection measures and protection Industrial structure and cleaner performance circs 13 measures production 14 Industrial solid waste disposal Environmental Execution environment of total Review and revise all measures of 19 management quantity control environmental management - 59 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 11 Communication and Stakeholder Participation 11.1. Public Participation Public participation has been extensively conducted during the preparation of Environmental Impact Assessment (EIA) and Resettlement Action Plan (RAP), so through which, public concerns have been fully reflected in the EIA/EMP and RAP. For the purpose of minimizing impacts, communication activities with the affected crowd of Project will continue throughout the Project. The aim of the communications is to provide a two-way information channel, through which Project progress and implementation of EMP can be introduced to the affected community, in this way, can communities’s feedback on ongoing Project impacts be timely communicated to the contractor(s) and XETDZ Management Committee. Contractor(s) are required to disclose information about Project contents, key environmental issues and mitigation measures, according to the recipient’s contact way at project construction site for published. A grievance mechanism is also established under the RAP in response to the public concerns about the land acquisition and livelihood compensation issues and so on. 11.2. Stakeholder Dialogue Mechanism A stakeholder dialogue mechanism will be established during the Project operation stage. The dialogue mechanism provides a forum to monitor and evaluate the regional development activities, change of ecological environmental status and social development progress of the XETDZ2. The key purpose of such a dialogue mechanism is to make all the relevant agencies and public can know the newest information about the regional development and cumulative environmental and social impacts. The XETDZ will be responsible for organizing a stakeholder dialogue meeting on a yearly basis. Stakeholders invited include (but not limited to) Anhui Province Environmental Protection Department (AEPD), Xuancheng Environmental Protection Bureau (XEPB), Xuancheng Development and Reform Commission (XDRC), Environmental Protection Branch of XETDZ, representatives from key industrial enterprises around the XETDZ2 and representatives from local communities and villager. Environmental and ecological monitoring data in XETDZ2 during the Project operation will be fully shared among the stakeholders. The key findings and recommendations from the meeting will be formally communicated to relevant governments in order to take the necessary follow-up actions to ensure a sustainable development of XETDTZ2, achieve the integration and harmonization of socio-economic development and ecological functions maintenance. - 60 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 12 Environmental Training and Capacity Plan 12.1. Construction Training The XETDZMC shall ensure that all staff is adequately trained prior to developing any activities associated with the XETDZ2 Project. The training will be provided to environmental management staff of XETDZ, ESE and contractors. Training to XETDZ staffs and ESE The aim of training to ESE and staffs from XETDZ is to strengthen the environmental management during construction and operation stage and ensure the effectiveness of environmental management so as to improve the overall project quality. Through the training, the ESE and environmental management staff can identify the main environmental problems and defects in environmental management, and cause the contractor so take necessary preventive measures as soon as possible. During construction, the XETDZ will invite the environment consultants with similar experience (environment specialist or environmental institution) to carry out the site training aim to the potential problems and corresponding solutions. Training to Contractors Prior to commencement is started, the environmental staffs and workers of the winning bidder shall receive the training on systematic environmental knowledge provided by ESE and XETDZ environmental management team to avoid bringing environmental damages due to operation errors. The training to environmental staffs of contractor(s) is to specify the environmental management liability of constructor(s), the training to workers is to address the issue of correct operation method during construction to reduce or avoid unnecessary damage. Through training, the contractor(s) shall be clearly aware of environmental protection liability undertaken and result possibly caused by environmental damage and the workers were able to clearly understand the protection method and degree of environment-sensitive points, the training to workers shall be for one week based on actual condition. The training plan with budget estimation as shown in Table 14. - 61 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Table 14 Environmental Protection Training Plan Budget S/N Trainee Content Organizer Participants Duration Place (RMB) Learn Environmental protection and management EP Staffs in XEDTZ, 1 knowledge XETDZ, IEC 3 5 days Xuancheng 10,000 ESE Enviromental management measures Study visit infrastructural projects mainly paying 2 EP Staffs in XEDTZ XETDZ, IEC 3 5 days Pending 50,000 attention to environmental protection Relevant provision, Requirement of EMP, 3 ESE XETDZ, IEC 10 10 days Xuancheng 20,000 Water and soil conservation plan and contingency plan Relevant provision, Main technical chief Requirement of EMP, 4 and construction chief XETDZ, IEC 30 10 days Xuancheng 20,000 Water and soil conservation of contractor(s) plan and contingency plan Relevant provision, Construction team and Requirement of EMP, 5 people in the same XETDZ, IEC 20 3 days Xuancheng 20,000 Water and soil conservation group plan and contingency plan Total 120,000 - 62 - China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 12.2. Environmental Supervision Capability Building The Development Zone Branch Office under Xuancheng Municipal Bureau of Environmental Protection will be responsible for the environmental management work in the project implementation of XETDZ2 and after the XETDZ2 is completed. Therefore, The capability building of Environmental Protection Branch Office is particularly important. In order to ensure smooth implementation of Project and environmental management of XETDZ2, it is required to promote the capability building of Environmental Protection Branch Office so as to satisfy the requirements of daily environmental management of XETDZ2. 12.2.1 XETDZ2 Information 1. Basic information The Development Zone Branch Office under Xuancheng Municipal Bureau of Environmental Protection is located in XETDZMC. As for administrative aspect, it belongs to Xuancheng Municipal Bureau of Environmental Protection, and it is dual command and established on 20th August, 2007 with approval of No. [2007] 32 document edited by municipal editorial board member and it is ZhengKeJi full funding public institution with approved establishment five people. There are six people now, in which 5 people are enrolled and one is hired driver. There are 2 leadership positions and 2 internal institutions in which 2 people in general management room and 2 people supervision management room. See Table 15 for personnel basic information. Table 15 Personnel basic information Number Education background Working years (No.) Major 1 Postgraduate 25 Environmental protection 1 Undergraduate 5 Law 1 Undergraduate 5 Chemistry 1 Undergraduate 22 Law 1 Undergraduate 1 Chinese 1 Senior high school 5 Driving 2. Law enforcement equipment allocation There is one state-financed vehicle, evidence-collections equipment has one camera, four desktop computers, one notebook computer, one fax machine and one printer available for Development Zone Branch Office under Xuancheng Municipal Bureau of Environmental Protection. 3. Environmental Management 63 China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 The Development Zone Branch Office under Xuancheng Municipal Bureau of Environmental Protection.is responsible for the environmental management work in three Offices governed by XETDZ such as Feicai, Jinba and Tianhu with area exceeding 200 square kilometers and over 200 supervision of industrail enterprises. The responsibility of the Development Zone Branch Office is environmental plan, project examination and approval, environmental protection acceptance, authentication management, environmental supervision, standardization control, pollution control, environmental safety, pollution discharge reporting, pollution charges, environmental petition letter, ecological construction, publicity and education, environmental statistics and special action of environmental protection and so on. 4. Problem of daily office occupancy The development Zone Branch has not house property at present, and they work in the office building of XETDZMC. They borrow three business occupancies form Management Commitment with 100 square meters building area. 12.2.2 Work development Besides following the Provincial Department and Municipal Bureau work, the daily work is, such as pollution control, environmental supervision, pollution discharge reporting, pollution control, environmental investigations and special action..The main task completed by XETDZ Branch in 2010-2012, please see Table 16. Table 16 Tasks finished by the XETDZ Environmental Protection Branch Office in 2010-2012 Item 2010 2011 2012 Project examination and approval(No.) 65 95 77 Environmental protection acceptance(No.) 7 12 8 Environmental protection authentication management (No.) 34 58 29 Petition letter case(piece) 12 15 11 Environmental supervision(time) 240 280 340 12.2.3 Environmental Supervision Capacity Assessment 1. Understaffed The branch has 6 people at present, and the key emphasis in its work is concentrated on project examination and approval, special examination assigned by the superior, investigations and enterprise service, etc.. Most daily work such as environmental protection acceptance, pollution control and environmental supervision can only alternately be carry out, which can not satisfy the 64 China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 requirements of work. At present, the requirements of environmental supervision is higher and higher, and the supervision content and project such as heavy metal dangerous goods, waste gas and wastewater increase constantly with more rigid requirement. With the construction of XETDZ2, a great many enterprises will settle in soon, and the environmental management and supervision power will be not enough.The branch has not established administrative office, thus the archives administration, receiving and dispatch of files and secretarial service will also be shortage. 2. Transportation shortage The development zone is in wide range, and the environmental protection work is in grass roots. At present, there is only one car to handle all affairs, which cannot ensure the environmental supervision car. 3. Inadequate regulatory resources The branch shall set special environmental supervision institution and equip with special purpose vehicle. 4. Adequate work, obtaining evidence and informatization equipment At present, The office, evidence-collections equipmen and informatization equipment are seriously short, that cannot cope with the environmental supervision work in XCTDZ. 12.2.4 Capacity Building of XETDZ Environmental Protection Branch Officeand training plan According to relevant standardization construction requirement of National Environmental Protection Ministry, combine with the reality of XEDTZ, put forward the following plans in aspect of team construction, equipment construction, business occupancy and personnel training, etc.: 1. Environmental Management Table 17 Criteria of team Buidling Category S/N Index content Criteria Remarks The environmental protection branch office sets one director general, two deputy director generals and one general engineer. There are office, Institution 1 Institution integrated business management room, and propaganda and education information center and personnel environmental monitoring team under it. Organizations are sound and operated formally. 2 Personnel scale 15 to 20 the organizational personnel 65 China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Category S/N Index content Criteria Remarks Personnel Personnel shall employ civil servant management 3 management or refer to the national servant management. Personnel education Excluding service 4 background 90% workers (above junior college) Professional personnel relevant 5 with 60% environmental protection It refers to Law enforcement environmental 6 officials training 100% monitoring post rate training rate. It refers to have China Law enforcement environmental 7 officials certified 100% monitoring law rate enforcement certificate. Basic function can arrive according to the 8 Function arriving functions ruled by Environmental Protection Ministry implementation of environmental 9 Systems are sound, observed and implemented. monitoring work system implementation of Integrated and reasonable procedure, simple and environmental Foundation 10 practical operation, standardized and orderly monitoring work work implementation. procedure implementation of environmental Submitting according to the requirement of 11 monitoring documents. governmental affairs 66 China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Category S/N Index content Criteria Remarks information submitting system Government Disclosure according to the requirement of article 12 affairs disclosure 5. systems File management Neat and normative filling in, complete and full 13 system data. Including All are brought into the financial budget personnel salary 14 Basic expenditure arrangement. and daily public funds. Including law enforcement funds and law Law enforcement All are brought into the financial budget enforcement 15 funds arrangement. equipment operating maintenance expenditure. Table 18 Criteria of equipment construction Standard Category S/N Index content Construction criteria configuration/selective configuration 1 Law enforcement vehicle 3 sets 2 Vehicle GPS satellite locator One set every year Vehicle-mounted Meet the job 4 communication equipment requirement Vehicle Vehicle-mounted office Meet the job Standard configuration 5 equipment requirement Vehicle-mounted sample Meet the job 6 preservation equipment requirement Meet the job 7 Vehicle-mounted radio station requirement Obtaining 8 Video camera 3 sets evidence 9 Camera 5 sets Standard configuration equipment 10 Video equipment 2 sets 67 China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Standard Category S/N Index content Construction criteria configuration/selective configuration Imaging equipment(television 11 2 sets and DVD player) 12 Handheld GPS locator 3 sets 13 Range finder 1 set 14 Flowmeter 2 sets 15 Acidometer 3 sets 16 Sound level meter 1 set 17 Sampling equipment 4 sets 18 Service with record machine 4 sets Flue gas and pollutant fast Meet the job 19 tester requirement Meet the job 20 Personal protective equipment requirement Meet the job 21 Dark tube detector requirement Selective configuration Meet the job 22 Water quality fast tester requirement Meet the job 23 Flue gas backness meter requirement Meet the job 24 Dust fast tester requirement Meet the job Communication 25 Telephone requirement equipment 26 Fax machine One set for each office 27 Desktop computer 1 set/people Meet the job Standard configuration 28 Printer Office requirement equipment 29 Portable printer 2 sets 30 Notebook computer 1 set/people 31 Duplicator 1 set Pollution discharge 32 expenditure management 1 set Informatization system Standard configuration equipment Environmental law One system, one 33 enforcement management and movable law movable law enforcement enforcement tool box 68 China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Standard Category S/N Index content Construction criteria configuration/selective configuration system for each car and/or one handheld PDA for each person Pollution source online 34 1 monitoring center 12369 environmental 35 1 set protection report hotline Table 19 Criteria of business occupancy S/N Index content Construction criteria Remarks 1 Office occupancy Not less than10 m2 per capital Law enforcement reception 2 Not less than 60 m2 office Evidence-collections Not less than 50 m2, and set small 3 equipment room operation room in it. 4 Record office Not less than 80m2 All are use areas. Pollution discharge declaration Not less than 80 m2 , including 5 acceptance office acceptance area and declaration area. 12369 environmental protection 6 hotline complaint acceptance 2 rooms,20 m2/room night duty room 2. Environmental management capacity training plan (1)Training purpose Environmental management training purpose is to ensure smooth and effective development of environmental management work, making relevant personnel know the content and procedure of environmental management, improving the environmental management capacity of environmental managers so as to ensure that all environmental protection work in XETDZ are effectively implemented. . (2)Training object The training objects are all personnel of XECTDZ Environmental Protection Branch Office. (3)Training content 1) Master and apply laws and regulations of environmental protection and environmental criteria; 2) On-job training (OJT) for project examination and approval and environmental 69 China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 monitoring; 3) Training for cleaner production review; 4) Dangerous waste management training; 5) Environmental monitoring training; 6) Emergency capaqcity training. (4)Training plan See table Table 20 for annual training plan. Table 20 Environmental management capacity training plan Cost Relevant Times of Days of Training Content (RMB ten personnel every year every time thousand) Environmental (1) Environmental laws and regulations All laws, regulations (2) Environmental policy and plan 2 2 7 personnel and policy (3) Environmental management knowledge Project Related examination and Project examination and approval 1 3 5 personnel approval Environmental Related Environmental monitoring 1 3 5 monitoring personnel Cleaner Personnel Cleaner production 1 5 6 production Dangerous waste Related Dangerous waste management 1 3 5 management personnel Environmental Related Environmental monitoring 1 5 5 monitoring personnel Emergency Personnel Emergency capacity 1 3 5 ability 70 China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 13 Environmental Protection Investment The EMP implementation during construction and operation has been budgeted as shown in Table 21. The total budget of environmental investment includes environmental mitigation measures, environmental protection monitoring, engineering management, main projects and environmental impact mitigation investment. It is noted that many mitigation measures is practical nature, and its budget is included in the integrated contract and may not be appointed. Table 21 List of the Project environmental protection investment Time Investment (RMB ten thousand) Content interval Estimate Remarks Social Media, Advance notice 10 environment Billboard in construction site 12 Borrow earth, spoil piled up Implementation in Water and maintenance 2726.6 accordance with water and soil Recovery of damaged vegetation soil preservation proposal conservation Soft cover treatment of stockpile Monitoring 44.8 Sprinkling 20 Equipped with sprayer. Atmosphere Monitoring 10 Set noise reduction facilities such as - 5 Construction Noise temporary noise barrier. period Monitoring 5 Construction wastewater treatment 20 Set sedimentation tank. Wastewater Monitoring 5 Transportation to Spoil disposal 120 Solid waste appointed spoil area. Domestic garbage treatment 5 Specially Environmental monitoring in construction period 260 Independent Environmental Management 150 Consultant Unforeseeable 170 Total 3753.4 The green area is Ecological Greening 260 calculated according to compensation Operating 25% of floor area. period Stink control measures of Atmosphere Prevention measure 50 WTP, refuse transfer station and public toilet. 71 China: Anhui Xuancheng Infrastructure for Industrial Relocation Project November, 2012 Monitoring (first year) 10 Noise control measures of WTP, refuse transfer Noise abatement 30 Noise station and lifting pumping station. Monitoring (first year) 5 Collection facilities of Wastewater treatment 20 Wastewater refuse leachate. Monitoring (first year) 5 Unforeseeable 19 Total 399 Training 50 Total 4033.4 Proportion in total investment (%) 1.56 72